  1. The role of effective communications in Nuclear Regulatory Commission licensing

    International Nuclear Information System (INIS)

    Counsil, W.G.

    1991-01-01

    Communications are essential to the licensing and general regulatory program of the Nuclear Regulatory Commission. This paper attempts to identify and address certain aspects of, and approaches to, maintaining effective and efficient communications. It considers, from the perspective of the high-level radioactive waste repository program, both internal communication within the DOE itself and external communication with the Nuclear Regulatory Commission and interested parties. Many of the points presented are based on lessons learned from electric utility experience with nuclear plants

  2. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  3. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  4. Regulatory view on licensing and commissioning of Temelin NPP

    International Nuclear Information System (INIS)

    Drabova, D.; Boehm, K.; Brandejs, P.; Tipek, Z.

    2004-01-01

    The competencies delegated to the Czech State Office for Nuclear Safety by Czech legislation are highlighted and the history of construction and commissioning of the Temelin nuclear power plant in relation to the licensing process is described. (P.A.)

  5. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    International Nuclear Information System (INIS)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2

  6. 75 FR 62153 - Notice of the Nuclear Regulatory Commission Issuance of Materials License SUA-1596 for Uranium...

    Science.gov (United States)

    2010-10-07

    ... Commission Issuance of Materials License SUA-1596 for Uranium One Americas, Inc. Moore Ranch In Situ Recovery.... SUPPLEMENTARY INFORMATION: The Nuclear Regulatory Commission (NRC) has issued a license to Uranium One Americas, Inc. (Uranium One) for its Moore Ranch uranium in situ recovery (ISR) facility in Campbell County...

  7. System engineering in the Nuclear Regulatory Commission licensing process: Program architecture process and structure

    International Nuclear Information System (INIS)

    Romine, D.T.

    1989-01-01

    In October 1987, the U.S. Nuclear Regulatory Commission (NRC) established the Center for Nuclear Waste Regulatory Analyses at Southwest Research Institute in San Antonio, Texas. The overall mission of the center is to provide a sustained level of high-quality research and technical assistance in support of NRC regulatory responsibilities under the Nuclear Waste Policy Act (NWPA). A key part of that mission is to assist the NRC in the development of the program architecture - the systems approach to regulatory analysis for the NRC high-level waste repository licensing process - and the development and implementation of the computer-based Program Architecture Support System (PASS). This paper describes the concept of program architecture, summarizes the process and basic structure of the PASS relational data base, and describes the applications of the system

  8. A materials engineering view of license renewal at the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Banic, M.

    1999-01-01

    This paper discusses the treatment of license renewal at the US Nuclear Regulatory Commission (NRC) with emphasis on the review process by the staff of the Materials and Chemical Engineering Branch (EMCB). The paper covers the rules governing license renewal, the applications received, the schedule, the approach, and the technical issues. The NRC has a tight schedule of 30-36 months to renew a license. To date, Baltimore Gas and Electric (BG and E) and Duke Power have applied for license renewal. Expecting more applicants, the staff has taken steps to address the public's concern that the effects of aging will be adequately managed and the industry's concern that the reviews will be timely, efficient, and uniform. These steps include identifying aging effects and making the results available in a report and computerized database, approving topical reports and aging management programs for generic use, and reviewing aging management programs according to specific criteria. Materials Engineering staff have a major role because many of the aging issues are materials related. (author)

  9. The U.S. Nuclear Regulatory Commission's antitrust review of nuclear power plants: the conditioning of licenses

    International Nuclear Information System (INIS)

    Penn, D.W.; Delaney, J.B.; Honeycutt, T.C.

    1976-04-01

    The 1970 amendments to Section 105 of the Atomic Energy Act require the Nuclear Regulatory Commission to conduct a prelicensing antitrust review of applications for licenses to construct and operate nuclear power plants. The Commission must make a finding as to whether the granting of a license 'would create or maintain a situation inconsistent with the antitrust laws,' and it has the authority to issue or continue a license, to refuse to issue a license, to rescind or amend a license, and to issue a license with conditions that it deems appropriate. This report provides information about the antitrust license conditions that have resulted from the NRC's antitrust review process. The process itself is described and a catalog of the applications requiring antitrust license conditions is presented. For each application, the license conditions are put into the general categories of unit access, transmission services, coordination, and contractual provisions. For completeness, the report also catalogs applications requiring no antitrust license conditions, and lists applications that were exempted from the 1970 amendments, are the subject of litigation, or have been withdrawn

  10. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  11. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  12. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  13. Regulation of Federal radioactive waste activities. Report to Congress on extending the Nuclear Regulatory Commission's licensing or regulatory authority to Federal radioactive waste storage and disposal activities

    International Nuclear Information System (INIS)

    1979-09-01

    The report contains two recommendations for extending the Commission's regulatory authority: (1) NRC licensing authority should be extended to cover all new DOE facilities for disposal of transuranic (TRU) waste and nondefense low-level waste. (2) A pilot program, focused on a few specific DOE waste management activities, should be established to test the feasibility of extending NRC regulatory authority on a consultative basis to DOE waste management activities not now covered by NRC's licensing authority or its extension as recommended in Recommendation 1

  14. Review of NRC Commission Papers on Regulatory Basis for Licensing and Regulating Reprocessing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Park, Jae Yeong; Shin, Hyeong Ki [KINS, Daejeon (Korea, Republic of)

    2016-05-15

    Spent nuclear fuel (SNF) accumulated in nuclear power plant has been a serious issue in most countries with operating nuclear power plants. Direct disposal of SNF could be a solution of the problem but many countries including the Republic of Korea have had a hard time selecting a site for high level waste repository because of low public acceptance. SNF recycling technologies consisting of reprocessing and transmutation have been developed so as to reduce the final volume of the disposed radioactive waste and to diminish the radiotoxicity of the waste. The Republic of Korea is now developing pyroprocessing and sodium-cooled fast reactor (SFR) technology to be used for the recycling of the wastes. KAERI has a plan to construct a pyroprocessing facility with a capacity of 30 tHM/y and a facility manufacturing TRU fuel for SFR by 2025. However, to license these facility and secure the safety, the current regulatory system related to SNF treatment needs to be improved and amended since the system has been developed focusing on facilities to examine irradiated nuclear materials. Status of reprocessing facility regulations developed by U.S.NRC was reviewed based on SECY papers. U.S.NRC has approved the development of a new rule referred to nationally as '10CFR Part 7x'. Existing 10CFR 50 and 70 has been evolved mainly for nuclear power plants and fuel cycle facilities whose radiological hazard is much lower than reprocessing plants respectively. U.S.NRC also derived many regulatory gaps including safety assessment methods, technical specification, general design criteria and waste classification and continue to develop the regulatory framework limited in scope to the resolution of Gap 5.

  15. Nuclear Regulatory Commission Issuances, November 1980

    International Nuclear Information System (INIS)

    1980-11-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  16. Nuclear Regulatory Commission Issuances, December 1980

    International Nuclear Information System (INIS)

    1980-12-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  17. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  18. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992

    International Nuclear Information System (INIS)

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  20. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991

    International Nuclear Information System (INIS)

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  1. Regulatory Commission of Alaska

    Science.gov (United States)

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  2. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. United State Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board, and Licensing Board decisions, July 1972--June 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 30, 1988 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This edition replaces in their entirety earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through June 30, 1988

  6. United States Nuclear Regulatory Commission staff practice and procedure digest. Commission, Appearl Board and Licensing Board decisions, July 1972-June 1985. Digest No. 4

    International Nuclear Information System (INIS)

    1986-01-01

    This edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period July 1, 1972 to June 30, 1985 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This edition replaces earlier editions and supplements and includes appropriate changes reflecting the amendment to the Rules of Practice effective June 30, 1985

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  9. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972-December 1985. Digest No. 4, Revision No. 2

    International Nuclear Information System (INIS)

    1986-08-01

    This Revision 2 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period July 1, 1972 to December 31, 1985, interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 2 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendment to the Rules of Practice effective December 31, 1985. Topics covered include prehearing and posthearing matters, herings, appeals, and general matters

  10. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972-December 1986

    International Nuclear Information System (INIS)

    1987-11-01

    This Revision 6 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1986, interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 6 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1986

  11. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board, and Licensing Board decisions issued from July 1, 1972 through March 31, 1986

    International Nuclear Information System (INIS)

    1986-10-01

    A digest is given of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to March 31, 1986, interpreting the NRC's Rules of Practice. Parts of earlier editions and supplements are replaced, and amendments to the Rules of Practice effective through March 31, 1986 are reflected. The material included deals with applications, prehearing matters, hearings, post-hearing matters, appeals, and decisions related to general matters. Decisions are indexed by facility, citation, CFR, statutes, case law, and other legal citations

  12. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1989

    International Nuclear Information System (INIS)

    1990-06-01

    This Revision 6 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1989 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 6 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1989

  13. United States Nuclear Regulatory Commission Staff practice and procedure digest: Commission, Appeal Board and Licensing Board Decisions, July 1972-March 1987

    International Nuclear Information System (INIS)

    1987-12-01

    This Revision 7 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to March 31, 1987 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 7 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through March 31, 1987

  14. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--September 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This Revision 1 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1988 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 1 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through September 30, 1988

  15. United States Nuclear Regulatory Commission staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972-September 1985. Digest No. 4, Revision No. 1

    International Nuclear Information System (INIS)

    1986-04-01

    This Revision 1 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1985 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 1 replaces earlier editions and supplements and includes appropriate changes reflecting the admendments to the Rules of Practice effective through September 20, 1985

  16. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  18. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  19. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  20. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1987

    International Nuclear Information System (INIS)

    1988-11-01

    This Revision 10 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and licensing Board decisions issued during the period from July 1, 1972 to December 31, 1987 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 10 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1987. The Digest is roughly structured in accordance with the chronological sequence of the nuclear facility licensing process as set forth in Appendix A to 10 CFR Part 2. Those decisions which did not fit into that structure are dealt with in a section on ''general matters.'' Where appropriate, particular decisions are indexed under more than one heading. Some topical headings contain no decision citations or discussion

  1. Regulatory systems-based licensing guidance documentation

    International Nuclear Information System (INIS)

    Delligatti, M.S.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) has developed a series of licensing guidance documents based on the regulatory requirements in Part 60 of Title 10 of the Code of Federal Regulations (10 CFR Part 60). This regulatory systems-based approach to licensing guidance documentation relies on the definition of the high-level waste repository in 10 CFR Part 60. A document which is important for the frame-work it gives to other programmatic licensing guidance is the Draft Regulatory Guide open-quotes Format and Content for the License Application for the High-Level Waste Repositoryclose quotes (FCRG). The FCRG describes a format and content acceptable to NRC for a high-level waste repository license application pursuant to the requirements of 10 CFR Part 60. Other licensing guidance documents will be compatible with the FCRG

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  3. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  4. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--September 1987

    International Nuclear Information System (INIS)

    1988-07-01

    This Revision 9 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1987 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 9 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through September 30, 1987. The Digest is roughly structured in accordance with the chronological sequence of the nuclear facility licensing process as set forth in Appendix A to 10 CFR Part 2. Those decisions which did not fit into that structure are dealt with in a section on ''general matters.'' Where appropriate, particular decisions are indexed under more than one heading. Some topical headings contain no decisions citations or discussion. It is anticipated that future updates to the Digest will utilize these headings

  5. United States Nuclear Regulatory Commission Staff practice and procedure digest: Commission, Appeal Board and Licensing Board Decisions, July 1972--December 1988

    International Nuclear Information System (INIS)

    1989-10-01

    This Revision 2 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1988, interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 2 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice Effective through December 31, 1988. The Practice and Procedure Digest was originally prepared by attorneys in the NRC's Office of the Executive Legal Director (now, Office of the General Counsel) as an internal research tool. Because of its proven usefulness to those attorneys, it was decided that it might also prove useful to members of the public. Accordingly, the decision was made to publish the Digest and subsequent editions thereof. This edition of the Digest was prepared by attorneys from Aspen Systems Corporation pursuant to Contract number 18-89-346

  6. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-05-01

    This report contains the issuances received during the specified period from the Atomic Safety and Licensing Board only. The two issuances included relate to: (1) suspension of byproduct material license for Eastern Testing and Inspection, Inc., and (2) license renewal for the Georgia Tech research reactor

  7. Regulation of Federal radioactive waste activities. Summary of report to Congress on extending the Nuclear Regulatory Commission's licensing or regulatory authority to Federal radioactive waste storage and disposal activities

    International Nuclear Information System (INIS)

    Smith, R.D.

    1979-09-01

    The NRC Authorization Bill for FY 1979 directed NRC to conduct a study of extending the Commission's licensing or regulatory authority to include categories of existing and future Federal radioactive waste storage and disposal activities not presently subject to such authority. The report includes a complete listing and inventory of all radioactive waste storage and disposal activities now being conducted or planned by Federal agencies. The NRC study has attempted to present a general comparison of the relative hazards associated with defense-generated and commercial wastes. Options for extending Commission authority were developed and analyzed. The implications of NEPA were analyzed in the context of these options. The national security implications of extending NRC's regulatory authority over DOE programs are examined and evaluated. Costs and benefits are identified and assessed. The Commission's recommendations, based on the study, are to extend licensing authority over new DOE disposal activities involving transuranic wastes and non-defense low-level waste and to initiate a pilot program to test the feasibility of NRC playing a consultative role in the evaluation of existing DOE activities

  8. Nuclear Regulatory Commission issuances, March 1975

    International Nuclear Information System (INIS)

    1975-04-01

    Reactor licensing actions taken by the Nuclear Regulatory Commission, the Atomic Safety and Licensing Appeal Board and the Atomic Safety and Licensing Boards for March 1975 are presented. Action was included for the following reactors: Big Rock Point Nuclear Plant; West Valley Reprocessing Plant; Limerick Generating Station, Units 1 and 2; Midland Plants, Units 1 and 2; Wolf Creek Generating Station, Unit 1; Monticello Nuclear Generating Plant, Unit 1; Douglas Point Nuclear Generating Station, Units 1 and 2; Seabrook Station, Units 1 and 2; Vermont Yankee Nuclear Power Station; and WPPSS Hanford Units 1 and 4. (U.S.)

  9. Federal/State cooperation in the licensing of a nuclear power project. A joint licensing process between the US Nuclear Regulatory Commission and the Washington State Energy Facility Site Evaluation Council

    International Nuclear Information System (INIS)

    1984-05-01

    This report summarizes and documents a joint environmental review and licensing process established between the US Nuclear Regulatory Commission (NRC) and the Washington State Energy Facility Site Evaluation Council (EFSEC) in 1980-1983 for the Skagit/Hanford Nuclear Project (S/HNP). It documents the agreements made between the agencies to prepare a joint environmental impact statement responsive to the requirements of the National Environmental Policy Act of 1969 (NEPA) and the Washington State Environmental Policy Act. These agreements also established protocol to conduct joint public evidentiary hearings on matters of mutual jurisdiction, thereby reducing the duplication of effort and increasing the efficiency of the use of resources of federal and state governments and other entities involved in the process. This report may provide guidance and rationale to licensing bodies that may wish to adopt some of the procedures discussed in the report in the event that they become involved in the licensing of a nuclear power plant project. The history of the S/HNP and of the agreement processes are discussed. Discussions are provided on implementing the joint review process. A separate section is included which presents independent evaluations of the process by the applicant, NRC, and EFSEC

  10. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  11. Regulatory guidance for license renewal

    International Nuclear Information System (INIS)

    Thoma, John A.

    1991-01-01

    The proposed 10 CFR Part 54 rule proceduralizes the process for license renewal by identifying both the administrative and technical requirements for a renewal application. To amplify and support this regulation, written guidance has been provided in the form of a draft Regulatory Guide (DG 1009) and a draft Standard Review Plan for License Renewal (NUREG 1299). This guidance is scheduled to be finalized in 1992. Similar guidance will be provided for the proposed revisions to 10 CFR Part 51 concerning the environmental aspects of license renewal. (author)

  12. Nuclear Regulatory Commission Information Digest 1992 edition

    International Nuclear Information System (INIS)

    Olive, K.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  13. Nuclear Regulatory Commission Information Digest, 1991 edition

    International Nuclear Information System (INIS)

    Olive, K.L.

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs

  14. Nuclear Regulatory Commission Information Digest: 1993 edition

    International Nuclear Information System (INIS)

    1993-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the U.S. Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1992, with exceptions noted. Information on generating capacity and average capacity factor for operating U.S. commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed. Comments and/or suggestions on the data presented are welcomed and should be directed to Karen Olive, United States Nuclear Regulatory Commission, Office of the Controller, Division of Budget and Analysis, Washington, D.C. 20555. For detailed and complete information about tables and figures, refer to the source publications

  15. Nuclear Regulatory Commission issuances: August 1994. Volume 40, Number 2

    International Nuclear Information System (INIS)

    1994-08-01

    This report contains the collected issuances of the US Nuclear Regulatory Commission for the month of August, 1994. The report includes issuances of the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. Some of the entities involved include Gulf States Utility company, Sequoyah Fuels Corporation and General Atomics, Georgia Power Company, and Arizona Public Service Company

  16. United States Nuclear Regulatory Commission staff practice and procedure digest

    International Nuclear Information System (INIS)

    1990-03-01

    This document contains procedures for review by US Nuclear Regulatory Commission for reviewing and deciding on matters pertaining to nuclear power plant licensing. Also, contained within the document are decisions the Commission has made between July 1972 to September 1989. (F.S.D.)

  17. Nuclear Regulatory Commission: 1981 annual report

    International Nuclear Information System (INIS)

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  18. Nuclear Regulatory Commission issuances, May 1982

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Appeal Boards, the Atomic Safety and Licensing Boards, the Administrative Law Judge, the Directors' Decision, and the Denials of Petitions for Rulemaking

  19. Nuclear Regulatory Commission issuances, May 1993

    International Nuclear Information System (INIS)

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors' Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers

  20. Nuclear Regulatory Commission Issuances, August 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit No. 1), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Westinghouse Electric Corp. (Export of LEU to the Philippines); Issuances of Atomic Safety and Licensing Appeal Boards--Duke Power Company (Amendment to Materials License SNM-1773--Transportation of Spent Fuel from Oconee Nuclear Station for Storage at McGuire Nuclear Station); Issuances of the Atomic Safety Licensing Boards--Commonwealth Edison Company (Byron Station, Units 1 and 2), Dairyland Power Cooperative (La Crosse Boiling Water Reactor, Operating License and Show Cause), Florida Power and Light Company (St. Lucie Plant, Unit No. 2), Florida Power and Light Company (Turkey Point Nuclear Generating, Units 3 and 4), Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit 1) Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), The Regents of the University of California (UCLA Research Reactor), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3: Terminiation of Proceedings); Issuances of the Directors Denial--Florida Power and Light Company

  1. Nuclear Regulatory Commission Issuances, May 81

    International Nuclear Information System (INIS)

    1981-05-01

    Contents: Issuances of the Nuclear Regulatory Commission--Consolidated Edison Company of New York, Inc. (Indian Point, Unit No. 2), Power Authority of the State of New York (Indian Point, No. 3 Nuclear Power Plant), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Statement of Policy on Conduct of Licensing Proceedings, Uranium Mill Licensing Requirements; Issuances of Atomic Safety and Licensing Appeal Boards--Houston Lighting and Power Company, et al. (South Texas Project, Units 1 and 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit No. 2), Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), Philadelphia Electric Company et al. (Peach Bottom Atomic Power Station, Units 2 and 3), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2); Issuances of the Atomic Safety and Licensing Boards--Duke Power Company (William B. McGuire Nuclear Station, Units 1 and 2), Florida Light and Power Company (Turkey Point Nuclear Generating, Units 3 and 4), Illinois Power Company, et al. (Clinton Power Station, Units 1 and 2), Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station); Issuances of the Directors Denial--Commonwealth Edison Company (Byron Station, Units 1 and 2), Consolidated Edison Company of New York, Inc. (Indian Point Unit No. 2), Gulf States Utilities Company (River Bend Station Units 1 and 2), Petition to Suspend All Operating Licenses for Pressurized Water Reactors (River Bend Station Units 1 and 2), Portland General Electric Company (Trojan Nuclear

  2. Indexes to Nuclear Regulatory Commission issuances, January--March 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    This document provides digests and indexes for issuances of the Nuclear Regulatory Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors Decisions, and the Decisions on Petitions for Rulemaking. These indexes and digests are intended to serve as a guide to the issuances.

  3. Indexes to Nuclear Regulatory Commission issuances, January--March 1997

    International Nuclear Information System (INIS)

    1997-01-01

    This document provides digests and indexes for issuances of the Nuclear Regulatory Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors Decisions, and the Decisions on Petitions for Rulemaking. These indexes and digests are intended to serve as a guide to the issuances

  4. Federal Energy Regulatory Commission (FERC) Regions

    Data.gov (United States)

    Department of Homeland Security — Federal Energy Regulatory Commission (FERC) Regions. FERC is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil....

  5. U.S. Nuclear Regulatory Commission natural analogue research program

    International Nuclear Information System (INIS)

    Kovach, L.A.; Ott, W.R.

    1995-01-01

    This article describes the natural analogue research program of the U.S. Nuclear Regulatory Commission (US NRC). It contains information on the regulatory context and organizational structure of the high-level radioactive waste research program plan. It also includes information on the conditions and processes constraining selection of natural analogues, describes initiatives of the US NRC, and describes the role of analogues in the licensing process

  6. Nuclear Regulatory Commission issuances, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Defense (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances, May 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, July 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, June 1992

    International Nuclear Information System (INIS)

    1992-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, April 1994

    International Nuclear Information System (INIS)

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances, December 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, December 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, December 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, September 1992

    International Nuclear Information System (INIS)

    1992-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, February 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, March 1993

    International Nuclear Information System (INIS)

    1993-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, July 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances, August 1992

    International Nuclear Information System (INIS)

    1992-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, August 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, February 1993

    International Nuclear Information System (INIS)

    1993-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, November 1992

    International Nuclear Information System (INIS)

    1992-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, April 1993

    International Nuclear Information System (INIS)

    1993-04-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Regulatory requirements for demonstration of the achieved safety level at the Mochovce NPP before commissioning

    International Nuclear Information System (INIS)

    Lipar, M.

    1997-01-01

    A review of regulatory requirements for demonstration of the achieved safety level at the Mochovce NPP before commissioning is given. It contains licensing steps in Slovakia during commissioning; Status and methodology of Mochovce safety analysis report; Mochovce NPP safety enhancement program; Regulatory body policy towards Mochovce NPP safety enhancement; Recent development in Mochovce pre-operational safety enhancement program review and assessment process; Licensing steps in Slovakia during commissioning

  4. Nuclear Regulatory Commission Issuances, September 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Commonwealth Edison Company (Dresden Nuclear Power Station, Unit 1), Consolidated Edison Company of New York (Indian Point, Unit 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Power Authority of the State of New York (Indian Point, Unit 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2); Issuances of Atomic Safety and Licensing Appeal Boards--Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Philadelphia Electric Company, et al. (Peach Bottom Atomic Power Statin, Units 2 and 3), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Statin, Unit No. 2), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3); Issuances of the Atomic Safety Licensing Boards--Cleveland Electric Illuminating Company, et al. (Perry Nuclear Power Plant, Units 1 and 2), Commonwealth Edison Company (Dresden Station, Units 2 and 3), Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), Southern California Edison Company, et al. (San Onofre Nuclear Generating Station, Units 2 and 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2), Texas Utilities Generating Company, et al

  5. Nuclear Regulatory Commission issuances, April 1989

    International Nuclear Information System (INIS)

    1989-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, July 1989

    International Nuclear Information System (INIS)

    1989-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances, March 1989

    International Nuclear Information System (INIS)

    1989-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, August 1990

    International Nuclear Information System (INIS)

    1990-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, December 1989

    International Nuclear Information System (INIS)

    1989-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, May 1989

    International Nuclear Information System (INIS)

    1989-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances, September 1987

    International Nuclear Information System (INIS)

    1987-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, May 1990

    International Nuclear Information System (INIS)

    1990-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, May 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, July 1988

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission Issuances, October 1986

    International Nuclear Information System (INIS)

    1986-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, February 1989

    International Nuclear Information System (INIS)

    1989-02-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, June 1987

    International Nuclear Information System (INIS)

    1987-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances, October 1989

    International Nuclear Information System (INIS)

    1989-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, December 1990

    International Nuclear Information System (INIS)

    1990-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, April 1991

    International Nuclear Information System (INIS)

    1991-04-01

    This report includes the issuances received during the specified period (April 1991) from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, April 1987

    International Nuclear Information System (INIS)

    1987-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission Issuances, August 1986

    International Nuclear Information System (INIS)

    1986-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, November 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission Issuances, March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances, November 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, June 1990

    International Nuclear Information System (INIS)

    1990-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances, February 1985

    International Nuclear Information System (INIS)

    1985-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, November 1990

    International Nuclear Information System (INIS)

    1990-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, September 1995. Volume 42, Number 3

    International Nuclear Information System (INIS)

    1995-09-01

    This book contains an issuance of the Atomic Safety and Licensing Board and a Director's Decision, both of the US Nuclear Regulatory Commission. The issuance concerns the dismissal of a case by adopting a settlement reached by the Staff of the Nuclear Regulatory Commission and a Radiation Safety Officer of a hospital in which the safety officer pled guilty to deliberate misconduct. The Director's Decision was to deny a petition to impose a fine on Tennessee Valley Authority concerning alleged harassment of the petitioner and to appoint an independent arbitration board to review all past complaints filed against TVA concerning the Watts Bar Nuclear Plant

  10. Nuclear Regulatory Commission issuances, September 1995. Volume 42, Number 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This book contains an issuance of the Atomic Safety and Licensing Board and a Director`s Decision, both of the US Nuclear Regulatory Commission. The issuance concerns the dismissal of a case by adopting a settlement reached by the Staff of the Nuclear Regulatory Commission and a Radiation Safety Officer of a hospital in which the safety officer pled guilty to deliberate misconduct. The Director`s Decision was to deny a petition to impose a fine on Tennessee Valley Authority concerning alleged harassment of the petitioner and to appoint an independent arbitration board to review all past complaints filed against TVA concerning the Watts Bar Nuclear Plant.

  11. Nuclear Regulatory Commission issuances, October 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  12. Nuclear Regulatory Commission: more aggressive leadership needed

    International Nuclear Information System (INIS)

    Staats, E.B.

    1980-01-01

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation

  13. Nuclear Regulatory Commission issuances, September 1988

    International Nuclear Information System (INIS)

    1988-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  14. Nuclear Regulatory Commission issuances, January 1997. Volume 45, Number 1

    International Nuclear Information System (INIS)

    1997-01-01

    This book contains issuances of the Atomic Safety and Licensing Board, Nuclear Regulatory Commission and Director's Decision for January 1997. The issuances concern Sequoyah Fuels Corporation and General Atomics Gore, Oklahoma Site decontamination and decommissioning funding; Louisiana Energy Services, Claiborne Enrichment Center denies appeal to review emergency planning; General Public Utilities Nuclear Corporation, Oyster Creek Nuclear Generating station, challenges to technical specifications concerning spent fuel pool; and Consumers Power Company, Palisades Nuclear Plant dry cask storage of spent nuclear fuel

  15. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    International Nuclear Information System (INIS)

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director's Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director's Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU's fitness-for-duty program

  16. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution

  17. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  18. Nuclear Regulatory Commission issuances: Volume 39, Number 6

    International Nuclear Information System (INIS)

    1994-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). Issuances of the Nuclear Regulatory Commission include: (1) Advanced Medical Systems, Inc.; (2) Henry Allen, Diane Marrone, and Susan Settino; and (3) Westinghouse Electric Corporation. Issuances of the Atomic Safety and Licensing Boards include: (1) Sequoyah Fuels Corporation and General Atomics Corporation and (2) Umetco Minerals Corporation. Issuances of Director's Decisions include: (1) Advanced Medical Systems, Inc., and (2) Boston Edison Company and all boiling water reactors. The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  19. Indexes to Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index

  20. Indexes to Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  1. Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4

    International Nuclear Information System (INIS)

    1995-04-01

    This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director's decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board's order imposing several restrictions on Dr. Bauer; a denial of an Interveners' Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner's petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat

  2. Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director`s decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board`s order imposing several restrictions on Dr. Bauer; a denial of an Interveners` Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner`s petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat.

  3. Regulatory Reform and License Termination Planning in Decommissioning

    International Nuclear Information System (INIS)

    Michael J. Meisner

    2000-01-01

    Decommissioning of commercial nuclear power plants (NPPs) must be safe and cost-effective and consider the needs of a wide range of stakeholders. The creative tension among these objectives has provided opportunities to reform the way these plants are regulated and managed in decommissioning. Enlightened and visionary leaders from the U.S. Nuclear Regulatory Commission (NRC) and industry are seizing these opportunities to create new paradigms for risk-informed regulation; creative stakeholder involvement; and effective, end-state focused, license termination planning

  4. United States Nuclear Regulatory Commission staff practice and procedure digest

    International Nuclear Information System (INIS)

    1991-02-01

    This Revision 9 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1990 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 9 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through September 30, 1990. This edition of the Digest was prepared by attorneys from Aspen Systems Corporation pursuant to Contract number 18-89-346. Persons using this Digest are placed on notice that it may not be used as an authoritative citation in support of any position before the Commission or any of its adjudicatory tribunals. Persons using this Digest are also placed on notice that it is intended for use only as an initial research tool, that it may, and likely does, contain errors, including errors in analysis and interpretation of decisions, and that the user should not rely on the Digest analyses and interpretations but must read, analyze and rely on the user's own analysis of the actual Commission, Appeal Board and Licensing Board decisions cited. Further, neither the United States, the Nuclear Regulatory Commission, Aspen Systems Corporation, nor any of their employees makes any expressed or implied warranty or assumes liability or responsibility for the accuracy, completeness or usefulness of any material presented in the Digest. The Digest is roughly structured in accordance with the chronological sequence of the nuclear facility licensing process as set forth in Appendix A to 10 CFR Part 2. Those decisions which did not fit into that structure are dealt with in a section on general matters. Where appropriate, particular decisions are indexed under more than one heading. (JF)

  5. 1992 Nuclear Regulatory Commission Annual Report

    International Nuclear Information System (INIS)

    1993-01-01

    This is the 18th annual report of the US Nuclear Regulatory Commission (NRC), covering events and activities occurring in fiscal year 1992 (the year ending September 30, 1992), with some treatment of events from the last quarter of calendar year 1992. The NRC was created by enactment in the Congress of the Energy Reorganization Act of 1974. It is an independent agency of the Federal Government. The five NRC Commissioners are nominated by the President and confirmed by the United States Senate. The Chairman of the Commission is appointed by the President from among the Commissioners confirmed

  6. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

  7. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  8. Law of the Energy Regulatory Commission

    International Nuclear Information System (INIS)

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  9. Nuclear Regulatory Commission issuances. Volume 23, No. 3

    International Nuclear Information System (INIS)

    1986-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), and the Directors' Decisions (DD)

  10. Licensing requirements for initial commissioning programs in Spain: Application to different PWR designs

    International Nuclear Information System (INIS)

    Munuera, A.; Conde, J.M.; Martinez, J.

    1991-01-01

    This paper describes the overall licensing process in Spain, focusing on the initial commissioning requirements. The significance of this part of the regulatory work is evident both from the licensing and the licensee's points of view. Licensing in Spain is ruled by different laws which determine the general requirements and fix the licensing frame. Being a nuclear technology importer country, the base of the regulatory work lies on the rules and regulations of the country of origin of the planet, with the addition of case specific requirements. The application of this methodology to plants designed in different countries produces licensing processes which are similar to the overall, but very different in its development. It also means a special technical effort on the part of the regulatory body to cope with the problems arising from the use of different technologies and safety standards. The start-up programs from fuel loading to full power of a Westinghouse plant (Vandellos 2) and a Siemens-KWU plant (Trillo 1) are compared from the technical point of view, enhancing the differences that can be relevant for the regulatory work. The difficulties arising from the application of both the German and US concepts are discussed. (orig.)

  11. 78 FR 62322 - Hydropower Regulatory Efficiency Act of 2013; Notice of Rescheduled Two-Year Licensing Process...

    Science.gov (United States)

    2013-10-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD13-9-000] Hydropower... recommendations on the feasibility of a two-year process for the issuance of a license for hydropower development... Hydropower Regulatory Efficiency Act of 2013. The workshop will be held in the Commission Meeting Room at 888...

  12. Overall review strategy for the Nuclear Regulatory Commission's High-Level Waste Repository Program

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1994-11-01

    The Overall Review Strategy gives general guidance to the Nuclear Regulatory Commission staff for conducting it's license application and pre-license application reviews. These reviews are in support of the Commission's construction authorization decision for a geologic repository for the disposal of high-level radioactive waste. Objectives and strategies are defined that focus the staff's reviews on determining compliance with requirements of 10 CFR Part 60. These strategies define how the staff prioritizes its reviews on those key technical uncertainties considered to be most important to repository performance. Strategies also give guidance for developing, in an integrated way, the License Application Review Plan together with supporting performance assessments, analyses, and research

  13. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  14. Problems and experience of regulatory review associated with plant construction and commissioning

    International Nuclear Information System (INIS)

    Commander, W.

    1979-01-01

    The work of the Assessment Branch of NII covering the regulatory review during design safety assessment, construction, commissioning and operation is described commencing with the nuclear licensing procedure through licence variations and conditions attached to the licence, to the final stages of plant construction up to commercial operation and full power production. The importance of the application of safety assessment principles is outlined, the importance of the Safety Inspectorate Schedule described, and the need to retain organisational and regulatory flexibility emphasised. (author)

  15. First update to the US Nuclear Regulatory Commission's regulatory strategy for the high-level waste repository program

    International Nuclear Information System (INIS)

    Johnson, R.L.; Linehan, J.J.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) staff has updated its initial regulatory strategy for the High-Level Waste Repository Licensing Program. The update describes changes to the initial strategy and summarizes progress and future activities. This paper summarizes the first update of the regulatory strategy. In general the overall strategy of identifying and reducing uncertainties is unchanged. Identifying regulatory and institutional uncertainties is essentially complete, and therefore, the current and future emphasis is on reducing those regulatory and institutional uncertainties identified to date. The NRC staff has improved the methods of reducing regulatory uncertainties by (1) enhancing the technical basis preparation process for potential rulemakings and guidance and (2) designing a new guidance document, called a staff position, for clarifying regulatory uncertainties. For guiding the US DOE's reduction of technical uncertainties, the NRC staff will give more emphasis to prelicense application reviews and less emphasis on preparing staff technical positions

  16. Nuclear Regulatory Commission issuances, March 1995. Volume 41, No. 3

    International Nuclear Information System (INIS)

    1995-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, May 1995. Volume 41, No. 5

    International Nuclear Information System (INIS)

    1995-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances. Volume 42, No. 6

    International Nuclear Information System (INIS)

    1995-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, April 1994. Volume 39, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  20. Nuclear Regulatory Commission issuances, March 1995. Volume 41, No. 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  1. Nuclear Regulatory commission issuances, Volume 42, No. 5

    International Nuclear Information System (INIS)

    1995-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances. Volume 42, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  3. Nuclear Regulatory Commission issuances, September 1994. Volume 40, No. 3

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances, December 1994. Volume 40, No. 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  5. Nuclear Regulatory Commission issuances, Volume 47, No. 1

    International Nuclear Information System (INIS)

    1998-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking

  6. Nuclear Regulatory Commission issuances, May 1995. Volume 41, No. 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  7. Nuclear Regulatory Commission issuances, Volume 45, No. 2

    International Nuclear Information System (INIS)

    1997-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances. Volume 42, No. 4

    International Nuclear Information System (INIS)

    1995-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, February 1996: Volume 43, No. 2

    International Nuclear Information System (INIS)

    1996-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances. Volume 38, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  11. Nuclear Regulatory Commission issuances, February 1996: Volume 43, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  12. 77 FR 34379 - Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory...

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD06-6-000] Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold a joint meeting...

  13. Establishment of regulatory framework for the development reactor licensing

    International Nuclear Information System (INIS)

    Jo, Jong C.; Yune, Young G.; Kim, Woong S.; Ahn, Sang K.; Kim, In G.; Kim, Hho J.

    2003-01-01

    With a trend that various types of advanced reactor designs are currently under development worldwide, the Korea Atomic Energy Research Institute has been developing an advanced reactor called ' System-integrated Modular Advanced Reactor (SMART)', which is a small sized integral type pressurized water reactor with a rated thermal power of 330 MW. To demonstrate the safety and the performance of the SMART reactor design, the SMART Research and Development Center has embarked to build a scaled-down pilot plant of SMART, called 'SMART-P' with a rated thermal power of 65 MW. In preparation for the forthcoming applications for both construction permit and operating license of SMART-P in the near future, the Korea Institute of Nuclear Safety is developing a new regulatory framework for licensing review of such a development reactor, which covers establishment of licensing process, identification and resolution of technical and safety issues, development of regulatory evaluation or verification-purpose computer codes and analytical methods, and establishment of design-specific, general design and operating criteria, regulations, and associated regulatory guides. This paper presents the current activities for establishing a regulatory framework for the licensing of a research and development reactor. Discussions are made on the SMART-P development program, the current Korean regulatory framework for reactor licensing, the SMART-P licensing-related issues, and the approach and strategy for developing an effective regulatory framework for the SMART-P licensing

  14. Nuclear Regulatory Commission issuances, April 1986. Volume 23, No. 4

    International Nuclear Information System (INIS)

    1986-04-01

    This report includes the issuances recieved during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, Volume 18, No. 5

    International Nuclear Information System (INIS)

    1983-11-01

    This report includes the issuances received during November, 1983, from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances. Volume 17, No. 4

    International Nuclear Information System (INIS)

    1983-04-01

    This report includes the issuances received during the specified period from the Commission (CLi), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Indexes to Nuclear Regulatory Commission issuances, January-June 1987

    International Nuclear Information System (INIS)

    1988-02-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  18. Nuclear Regulatory Commission issuances. Vol. 16, No. 5

    International Nuclear Information System (INIS)

    1982-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM)

  19. Nuclear Regulatory Commission Issuances. Volume 23, No. 1

    International Nuclear Information System (INIS)

    1986-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Indexes to Nuclear Regulatory Commission issuances, January-March 1987

    International Nuclear Information System (INIS)

    1987-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Appeal Panel, the Atomic Safety and Licensing Board Panel, the Administrative Law Judge, the Directors' Decisions, and the Denials of Petitions of Rulemaking are presented in this document

  1. Indexes to Nuclear Regulatory Commission issuances, January--March 1989

    International Nuclear Information System (INIS)

    1989-07-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document

  2. Indexes to Nuclear Regulatory Commission issuances, January-June 1982

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  3. Nuclear Regulatory Commission issuances. Volume 20, No. 4

    International Nuclear Information System (INIS)

    1984-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Indexes to Nuclear Regulatory Commission issuances, July-December 1986

    International Nuclear Information System (INIS)

    1987-07-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  5. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1992-08-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1991, interpreting the NRC's Rules of Pratice in 10 CFR Part 2

  6. United States Nuclear Regulatory Commission Staff practice and procedure digest

    International Nuclear Information System (INIS)

    1990-08-01

    This Revision Number 7 of the fifth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period July 1, 1972 to March 31, 1990, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  7. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1992-02-01

    This revision of the sixth edition of the NRC Practice and Procedure Digest contains a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  8. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1992-05-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  9. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1993-08-01

    This 7th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  10. United States Nuclear Regulatory Commission Staff practice and procedure digest

    International Nuclear Information System (INIS)

    1993-05-01

    This 6th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  11. Nuclear Regulatory Commission issuances. Volume 20, No. 2

    International Nuclear Information System (INIS)

    1984-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances. Volume 21, No. 6

    International Nuclear Information System (INIS)

    1985-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances. Volume 21, No. 5

    International Nuclear Information System (INIS)

    1985-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances. Vol. 16, No. 4

    International Nuclear Information System (INIS)

    1982-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, December 1982. Vol. 16, No. 6

    International Nuclear Information System (INIS)

    1982-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuance, pages 933-1089

    International Nuclear Information System (INIS)

    1981-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors Denial (DD), and the Denial of Petitions for Rulemaking

  17. Nuclear Regulatory Commission issuances. Volume 22, No. 6

    International Nuclear Information System (INIS)

    1985-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Indexes to Nuclear Regulatory Commission issuances, July-September 1986

    International Nuclear Information System (INIS)

    1987-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  19. Indexes to Nuclear Regulatory Commission issuances, July-December 1987

    International Nuclear Information System (INIS)

    1988-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  20. Nuclear Regulatory Commission Issuances. Volume 22, No. 1

    International Nuclear Information System (INIS)

    1985-07-01

    This report includes the issuances received during July 1985 from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, June 1986. Volume 23, No. 6

    International Nuclear Information System (INIS)

    1986-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances. Vol. 16, No. 1

    International Nuclear Information System (INIS)

    1982-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM)

  3. Indexes to Nuclear Regulatory Commission issuances, July-September 1983

    International Nuclear Information System (INIS)

    1983-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as guide to the issuances

  4. Indexes to Nuclear Regulatory Commission issuances, July--December 1989

    International Nuclear Information System (INIS)

    1990-05-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  5. Nuclear Regulatory Commission Issuances. Volume 23, No. 2

    International Nuclear Information System (INIS)

    1986-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances. Volume 22, No. 5

    International Nuclear Information System (INIS)

    1985-11-01

    This report includes the issuances received during November 1985 from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission staff approaches to improving the integration of regulatory guidance documents and prelicensing reviews

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1994-01-01

    The Nuclear Regulatory Commission staff is conducting numerous activities to improve the integration of its regulatory guidance documents (i.e., License Application Review Plan (LARP) and open-quotes Format and Content for the License Application for the High-Level Waste repositoryclose quotes (FCRG)) and pre-license application (LA) reviews. Those activities related to the regulatory guidance documents consist of: (1) developing an hierarchy of example evaluation findings for LARP; (2) identifying LARP review plan interfaces; (3) conducting an integration review of LARP review strategies; (4) correlating LARP to the ongoing technical program; and (5) revising the FCRG. Some of the more important strategies the staff is using to improve the integration of pre-LA reviews with the LA review include: (1) use of the draft LARP to guide the staff's pre-LA reviews; (2) focus detailed pre-LA reviews on key technical uncertainties; (3) identify and track concerns with DOE's program; and (4) use results of pre-LA reviews in LA reviews. The purpose of this paper is to describe these ongoing activities and strategies and discuss some of the new work that is planned to be included in LARP Revision 1 and the final FCRG, which are scheduled to be issued in late 1994. These activities reflect both the importance the staff has placed on integration and the staff's approach to improving integration in these areas. The staff anticipates that the results of these activities, when incorporated in the FCRG, LARP, and pre-LA reviews, will improve its guidance for DOE's ongoing site characterization program and LA annotated outline development

  8. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  9. The Spanish energy regulatory body: the national energy commission (CNE)

    International Nuclear Information System (INIS)

    Merono, P. M.

    2002-01-01

    The National Energy Commission (CNE) is the Spanish Energy Regulatory body. This paper presents its scope and purpose, organisation, resources and financing, financial and performance control, functions, and legal provisions. (author)

  10. Regulatory analysis for final rule on nuclear power plant license renewal

    International Nuclear Information System (INIS)

    1991-12-01

    This regulatory analysis provides the supporting information for the final rule (10 CFR Part 54) that defines the Nuclear Regulatory Commission's requirements for renewing the operating licenses of commercial nuclear power plants. A set of four specific alternatives for the safety review of license renewal applications is defined and evaluated. These are: Alternative A-current licensing basis; Alternative B-extension of Alternative A to require assessment and managing of aging; Alternative C -- extension of Alternative B to require assessment of design differences against selected new-plant standards using probabilistic risk assessment; and Alternative D -- extension of Alternative B to require compliance with all new-plant standards. A quantitative comparison of the four alternatives in terms of impact-to-value ratio is presented, and Alternative B is the most cost-beneficial safety review alternative

  11. Nuclear Regulatory Commission issuances. Volume 22, No. 4

    International Nuclear Information System (INIS)

    1985-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  12. United States Nuclear Regulatory Commission Staff practice and procedure digest

    International Nuclear Information System (INIS)

    1991-12-01

    This sixth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1990 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This sixth edition replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1990

  13. Indexes to Nuclear Regulatory Commission issuances, January--June 1989

    International Nuclear Information System (INIS)

    1989-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Appeal Panel, the Atomic Safety and Licensing Board Panel, the Administrative Law Judge, the Directors' Decisions, and the Denials of Petitions of Rulemaking are presented in this document. The information elements are displayed in one or more of five separate formats. These formats are case named index digests and headers, legal citations index, subject index, and facility index

  14. Indexes to Nuclear Regulatory Commission issuances, July--December 1988

    International Nuclear Information System (INIS)

    1989-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers, legal citations index, subject index, and facility index

  15. Indexes to Nuclear Regulatory Commission issuances, July--September 1988

    International Nuclear Information System (INIS)

    1989-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These information elements are displayed in one or more of five separate formats. These formats are case name index, digests and headers, legal citations index, subject index and facility index

  16. Nuclear Regulatory Commission issuances. Volume 47, Number 3

    International Nuclear Information System (INIS)

    1998-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director's Decision to the North Atlantic Energy Service Corporation

  17. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1 - December 31, 1996. Volume 44, Pages 1 - 432

    International Nuclear Information System (INIS)

    1997-01-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors' Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM

  18. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  19. US Nuclear Regulatory Commission annual report, 1985. Volume 2

    International Nuclear Information System (INIS)

    1986-01-01

    The decisions and actions of the Nuclear Regulatory Commission (NRC) during fiscal year 1985 are reported. Areas covered include reactor regulation, cleanup at Three Mile Island, analysis and evaluation of operational experience, nuclear materials, waste management, safeguards, inspection, enforcement, quality assurance, emergency preparedness, and nuclear regulatory research. Also, cooperation with the states, international programs, proceedings and litigation, and management are discussed

  20. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...: Alicia Goldin, Division of Trading and Markets, Securities and Exchange Commission, 100 F Street NE... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...

  1. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  2. Nuclear Regulatory Commission issuances. Volume 46, Number 2

    International Nuclear Information System (INIS)

    1997-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  3. Nuclear Regulatory Commission issuances: Volume 46, Number 6

    International Nuclear Information System (INIS)

    1997-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decision (DD), and the Decision on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  4. Nuclear Regulatory Commission issuances. Volume 47, Number 2

    International Nuclear Information System (INIS)

    1998-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). They involve: 21st Century Technologies, Inc.; Hydro Resources, Inc.; Northeast Utilities; and Northern States Power Company

  5. Nuclear Regulatory Commission issuances. Volume 46, Number 1

    International Nuclear Information System (INIS)

    1997-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  6. Nuclear Regulatory Commission issuances, June 1997. Volume 45, Number 6

    International Nuclear Information System (INIS)

    1997-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  7. Nuclear Regulatory Commission issuances: June 1995. Volume 41, Number 6

    International Nuclear Information System (INIS)

    1995-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). This report contains four issuances by the CLI, 5 issuances by the LBP, and 1 issuance by the DD

  8. Nuclear Regulatory Commission issuances, Volume 45, No. 5

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  9. Indexes to Nuclear Regulatory Commission Issuances, January--June 1994

    International Nuclear Information System (INIS)

    1994-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  10. Nuclear Regulatory Commission issuances: Volume 46, Number 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decision (DD), and the Decision on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  11. Nuclear Regulatory Commission issuances, Volume 45, No. 5

    International Nuclear Information System (INIS)

    1997-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  12. Indexes to Nuclear Regulatory Commission issuances, January--March 1996

    International Nuclear Information System (INIS)

    1996-01-01

    This publication is the 1st quarter 1996 index to issuances by the US NRC. These include issuances by the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking

  13. Nuclear Regulatory Commission issuances: June 1995. Volume 41, Number 6

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). This report contains four issuances by the CLI, 5 issuances by the LBP, and 1 issuance by the DD.

  14. Federal Trade Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ...) Retail Food Store Advertising and Marketing Practices, 16 CFR 424; (8) the Negative Option Rule, 16 CFR... Deregulatory Actions includes The Regulatory Plan, which appears in both the online Unified Agenda and in part... available online at www.reginfo.gov , in a format that offers users a greatly enhanced ability to obtain...

  15. US Nuclear Regulatory Commission 1983 annual report

    International Nuclear Information System (INIS)

    1984-01-01

    The thirteen chapters of this annual report are titled: 1983 highlights/1984 planning; reactor regulation; cleanup at TMI-2; operational experience; nuclear materials; safeguards; waste management; inspection, enforcement and emergency preparedness; cooperation with the states; international programs; nuclear regulatory research; proceedings and litigation; and management and communication

  16. United States Nuclear Regulatory Commission information digest: 1997 edition. Volume 9

    International Nuclear Information System (INIS)

    1997-05-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, NRC licensed activities, and general information on domestic and world-wide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1996, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  17. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-04-26

    ...: 3235-AK58 420. REVISIONS TO REGULATION D Legal Authority: 15 USC 77b(a)(15); 15 USC 77b(b); 15 USC 77d; 15 USC 77r; 15 USC 77s; 15 USC 77s(a); 15 USC 77z-3 Abstract: The Division is considering... SOLICITATION ENHANCEMENTS Legal Authority: 15 USC 78n Abstract: The Commission proposed amendments to its proxy...

  18. Nuclear regulatory commission issuances. Volume 40, Number 1

    International Nuclear Information System (INIS)

    1994-07-01

    This report includes issuances concerning the following items. The Commission denies General Atomics' motion seeking to stay discovery in this proceeding until (1) the Commission determines whether it will grant General Atomics' Petition for Review of LBP-94-17 and/or Motion for Directed Certification; and (2) assuming that the commission grants the Petition/Motion, the Commission determines with finality the jurisdictional issues raised in General Atomics' previously filed Motion for Summary Disposition or for an Order of Dismissal. In this proceeding concerning an NRC Staff enforcement order issues in accordance with 10 C.F.R. section 2.202, the Licensing Board concludes that a Native American tribe wishing to participate in the proceeding to support the Staff's enforcement order has established its standing and presented two litigable contentions. This informal adjudicatory proceeding, convened under 10 C.F.R. Part 2, Subpart L, involves an application by the Chemetron Corporation (Licensee) for a license amendment. The proposed amendment concerns the decommissioning of the Licensee's Bert Avenue site in Newburgh Heights, Ohio, and its Harvard Avenue site and associated buildings at the McGean-Rohco property in Cuyahoga Heights, Ohio. In this license suspension and modification enforcement proceeding, the Licensing Board rules on prediscovery dispositive motions regarding ten issues specified by the parties for litigation. The Licensing Board determines that an Intervenor may move to admit into the proceeding a new basis for an already admitted contention. When it does so, the requirements for a late-filed contention are not applicable, but the Intervenor must show that it is timely to consider the new basis, in light of its seriousness and the timelines with which it has been raised. The Licensing Board also permitted Intervenor to file a reply to Applicant's response to his motion to add a new basis to his contention

  19. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    International Nuclear Information System (INIS)

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-01-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  20. Indexes to Nuclear Regulatory Commission issuances, July-December 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: case name index; digests and headers; legal citations index; subject index; and facility index

  1. Nuclear Regulatory Commission issuances. Volume 44, Number 2

    International Nuclear Information System (INIS)

    1996-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM). The topics of this publication include the dismissal of a suit brought against Georgia Power Company in the transfer of Vogtle Electric Generating Plant, units 1 and 2 to Southern Nuclear; and denial of a petition to review the entire licensing process for Watts Bar Nuclear Plant, Unit 1 operated by the Tennessee Valley Authority

  2. Nuclear Regulatory Commission issuances, Volume 46, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report includes the issuances received in October 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. Five issuances were received on the following subjects: (1) decontamination and decommissioning funding for Sequoyah Fuels Corporation and General Atomics; (2) involvement in NRC-licensed activities by Aharon Ben-Haim; (3) Barnett Industrial X-Ray, Inc.; (4) spent fuel storage installation at Northern States Power Company; and (5) Vermont Yankee Nuclear Power Station. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  3. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1990-11-01

    This Revision 8 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 30, 1990 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 8 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through June 30, 1990

  4. Nuclear Regulatory Commission issuances, Volume 46, No. 4

    International Nuclear Information System (INIS)

    1997-10-01

    This report includes the issuances received in October 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. Five issuances were received on the following subjects: (1) decontamination and decommissioning funding for Sequoyah Fuels Corporation and General Atomics; (2) involvement in NRC-licensed activities by Aharon Ben-Haim; (3) Barnett Industrial X-Ray, Inc.; (4) spent fuel storage installation at Northern States Power Company; and (5) Vermont Yankee Nuclear Power Station. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  5. Indexes to Nuclear Regulatory Commission issuances, January--June 1991

    International Nuclear Information System (INIS)

    1991-10-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index, digest and headers, legal citations index, subject index, and facility index

  6. Indexes to Nuclear Regulatory Commission issuances, July--September 1990

    International Nuclear Information System (INIS)

    1990-12-01

    Digests and indexes for issuances of the commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers, legal citations index, subject index, and facility index

  7. Indexes to Nuclear Regulatory Commission issuances, July--December 1990

    International Nuclear Information System (INIS)

    1991-03-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers legal citations index, subject index, and facility index

  8. Indexes to Nuclear Regulatory Commission issuances, January-March 1982

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. This information is displayed in one or more of five separate formats arranged as follows: case name index; digests and headers; legal citations index; subject index; and facility index

  9. Indexes to Nuclear Regulatory Commission issuances, January--June 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALI), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers, legal citations index, subject index, and facility index

  10. Indexes to Nuclear Regulatory Commission issuances, January--March 1991

    International Nuclear Information System (INIS)

    1991-06-01

    Digests and indexes for Issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: case name index, digests and headers, logical citations index, subject index and facility index

  11. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  12. Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387

    International Nuclear Information System (INIS)

    1994-01-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors' decisions

  13. Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors` decisions.

  14. Nuclear Regulatory Commission Issuances, Volume 42, No. 2

    International Nuclear Information System (INIS)

    1995-08-01

    This report include the issuances received during the specificed period (August 1995) from the NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, and the Decisions on Petitions for Rule Making. In these issuances, the following areas were addressed: (1) Emergency planning at the University of Missouri, (2) Transfer of operating license at Plant Vogtle, (3) Discriminatory action against a whistle-blower at Millstone Units 1 ampersand 2, (4) Regulatory issues related to embittlement and cracking at Oyster Creek, and (5) Age-related deterioration of reactor internals components at Pilgrim

  15. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    International Nuclear Information System (INIS)

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  16. Indexes to Nuclear Regulatory Commission issuances, January--March 1992

    International Nuclear Information System (INIS)

    1992-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; Digests and headers; Legal citations index; subject index; and facility index

  17. Indexes to Nuclear Regulatory Commission Issuances, July--December 1993

    International Nuclear Information System (INIS)

    1994-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index, and Facility Index

  18. Indexes to Nuclear Regulatory Commission Issuances, January 1996--June 1996

    International Nuclear Information System (INIS)

    1996-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, The Administrative Law Judges, the Director's Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. The digests and indexes are intended to serve as a guide to the issuances. Information elements common the cases hear and ruled upon are displayed in one or more of five formats: case name index, headers and digests, legal citations index, subject index, and facility index

  19. Indexes to Nuclear Regulatory Commission issuances, January--June 1992

    International Nuclear Information System (INIS)

    1992-09-01

    Digests and indexes for insurances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index

  20. Indexes to Nuclear Regulatory Commission issuances, July--September 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Digest and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. these digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index, and facility index

  1. Nuclear Regulatory Commission Issuances. Volume 45, No. 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This report includes the issuances received in March 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 10 issuances were received: Louisiana Energy Services (2 issuances); Illinois Power Company and Soyland Power Cooperative; Ralph. L. Tetrick; University of Cincinnati; Consumers Power Company; Entergy Operations, Inc.; Georgia Power Company; Westinghouse Electric Corporation; and Wisconsin Electric Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  2. Indexes to Nuclear Regulatory Commission Issuances, January 1996--June 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, The Administrative Law Judges, the Director`s Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. The digests and indexes are intended to serve as a guide to the issuances. Information elements common the cases hear and ruled upon are displayed in one or more of five formats: case name index, headers and digests, legal citations index, subject index, and facility index.

  3. Indexes to Nuclear Regulatory Commission issuances, July--December, 1991

    International Nuclear Information System (INIS)

    1991-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index; and Facility Index

  4. Indexes to Nuclear Regulatory Commission issuances, January--March 1993

    International Nuclear Information System (INIS)

    1993-07-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index

  5. Indexes to Nuclear Regulatory Commission Issuances, January-March 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors Denials (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility), Full text reference (volume and pagination), Issuance number, Issues raised by appellants, Legal citations (cases, regulations, and statutes), Name of facility, Docket number, Subject matter of issues and/or rulings, Type of hearing (for construction permit, operating license, etc.), and Type of issuance

  6. Indexes to Nuclear Regulatory Commission issuances, July-December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (operating license, operating license amendment, etc); Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats: Case Name Index, Headers and Digests, Legal Citations Index, Subject Index, and Facility Index.

  7. Indexes to Nuclear Regulatory Commission issuances, January-March 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full test reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); and Type of issuance (memorandum, order, decision, etc.)

  8. Indexes to Nuclear Regulatory Commission issuances, January--June 1988

    International Nuclear Information System (INIS)

    1988-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administration Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petition of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  9. Indexes to Nuclear Regulatory Commission Issuances, January-June 1981

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); and Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index, Digests and Headers, Legal Citations Index, Subject Index, and Facility Index

  10. Indexes to Nuclear Regulatory Commission Issuances, January--March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, Docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: case name index; digests and headers; legal citations index; subject index; and facility index

  11. Indexes to Nuclear Regulatory Commission issuances, July-December 1997

    International Nuclear Information System (INIS)

    1998-01-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (operating license, operating license amendment, etc); Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats: Case Name Index, Headers and Digests, Legal Citations Index, Subject Index, and Facility Index

  12. KWOC [Key-Word-Out-of-Context] Index of US Nuclear Regulatory Commission Regulatory Guide Series

    International Nuclear Information System (INIS)

    Jennings, S.D.

    1990-04-01

    To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE ''KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series

  13. Pilot program: NRC severe reactor accident incident response training manual: US Nuclear Regulatory Commission response

    International Nuclear Information System (INIS)

    Sakenas, C.A.; McKenna, T.J.; Perkins, K.; Miller, C.W.; Hively, L.M.; Sharpe, R.W.; Giitter, J.G.; Watkins, R.M.

    1987-02-01

    This pilot training manual has been written to fill the need for a general text on NRC response to reactor accidents. The manual is intended to be the foundation for a course for all NRC response personnel. US Nuclear Regulatory Commission Response is the fifth in a series of volumes that collectively summarize the US Nuclear Regulatory Commission (NRC) emergency response during severe power reactor accidents and provide necessary background information. This volume describes NRC response modes, organizations, and official positions; roles of other federal agencies are also described briefly. Each volume serves, respectively, as the text for a course of instruction in a series of courses for NRC response personnel. These materials do not provide guidance or license requirements for NRC licensees. Each volume is accompanied by an appendix of slides that can be used to present this material. The slides are called out in the text

  14. US Nuclear Regulatory Commission organization charts and functional statements

    International Nuclear Information System (INIS)

    1997-01-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed

  15. US Nuclear Regulatory Commission organization charts and functional statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  16. Summary and analysis of public comments on NUREG-1317: Regulatory options for nuclear plant license renewal: Final report

    International Nuclear Information System (INIS)

    Ligon, D.M.; Seth, S.S.

    1989-03-01

    On August 29, 1988, the US Nuclear Regulatory Commission (NRC) issued an Advance Notice of Proposed Rulemaking on nuclear plant license renewal and solicited public comments on NUREG-1317, ''Regulatory Options for Nuclear Plant License Renewal.'' NUREG-1317 presents a discussion of fifteen topics involving technical, environmental, and procedural issues and poses a set of related questions. As part of its ongoing task for the NRC, The MITRE Corporation has summarized and analyzed the public comments received. Fifty-three written comments were received. Of these, 83 percent were from nuclear industry representatives; the remaining comments represented federal and state agencies, public interest groups, and a private citizen

  17. Reactors licensing: proposal of an integrated quality and environment regulatory structure for nuclear research reactors in Brazil

    International Nuclear Information System (INIS)

    Serra, Reynaldo Cavalcanti

    2014-01-01

    A new integrated regulatory structure based on quality and integrated issues has been proposed to be implemented on the licensing process of nuclear research reactors in Brazil. The study starts with a literature review about the licensing process in several countries, all of them members of the International Atomic Energy Agency. After this phase it is performed a comparative study with the Brazilian licensing process to identify good practices (positive aspects), the gaps on it and to propose an approach of an integrated quality and environmental management system, in order to contribute with a new licensing process scheme in Brazil. The literature review considered the following research nuclear reactors: Jules-Horowitz and OSIRIS (France), Hanaro (Korea), Maples 1 and 2 (Canada), OPAL (Australia), Pallas (Holand), ETRR-2 (Egypt) and IEA-R1 (Brazil). The current nuclear research reactors licensing process in Brazil is conducted by two regulatory bodies: the Brazilian National Nuclear Energy Commission (CNEN) and the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA). CNEN is responsible by nuclear issues, while IBAMA by environmental one. To support the study it was applied a questionnaire and interviews based on the current regulatory structure to four nuclear research reactors in Brazil. Nowadays, the nuclear research reactor’s licensing process, in Brazil, has six phases and the environmental licensing process has three phases. A correlation study among these phases leads to a proposal of a new quality and environmental integrated licensing structure with four harmonized phases, hence reducing potential delays in this process. (author)

  18. Indexes to Nuclear Regulatory Commission issuance, July-December 1980. Index of Volume 12, Number 4

    International Nuclear Information System (INIS)

    1980-01-01

    Issuances of the Atomic Safety and Licensing Board (ASLB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Administrative Law Judge (ALJ), regulatory issuances of the Commission (CLI), the Directors Denial (DD), and the Denials of Petitions for Rulemaking for the period July through December 1980 appear in Nuclear Regulatory Commission Issuances, 12 NRC No. 1, Pages 1-136, through 12 NRC No. 6, Pages 607-742. Digests and indexes for these issuances are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); Name of facility, docket number; Type of hearing (for construction permit, operating licenses, etc.); Issues raised by appellants; Issuance number; Type of issuance (memorandum, order, decision, etc.); Issuance pagination; Legal citations (cases, regulations, and statutes); and Subject matter of issues and/or rulings. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; Digests and headers; Legal citation index; Subject index; and Facility index

  19. Current regulatory and licensing status for byproduct sources, facilities and applications

    International Nuclear Information System (INIS)

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig

  20. The role of the Nuclear Regulatory Commission in the management of nuclear waste

    International Nuclear Information System (INIS)

    Thompson, H.L. Jr.

    1988-01-01

    In general, the US Nuclear Regulatory Commission (NRC) is responsible for reviewing and making licensing decisions to ensure that the US Department of Energy's (DOE's) high-level waste repository is designed, constructed, and operated without unreasonable risk to public health and safety. In implementing this responsibility, however, the commission's guidance to the staff is that, in the absence of unresolved safety concerns, the NRC regulatory program will not delay the executive branch's program as set forth in the DOE project decision schedule. The NRC role for the next several years will be to develop its licensing framework and to consult with DOE on its plans. An essential ingredient in the success of both NRC's and DOE's respective missions is the need for free and open exchange of information, which will assure us that the concerns of all parties are addressed. With regard to low-level radioactive waste, the states have the lead responsibility for disposal. The NRC also provides assistance to the states and compacts on such items as regulatory programs, site characterization, and mixed waste disposal. Another of the NRC's roles is in the management of uranium mill tailings. Currently, most of the NRC's attention is focused on ensuring adequate long-term stabilization of tailings

  1. US Nuclear Regulatory Commission, 1984 annual report. Volume 1

    International Nuclear Information System (INIS)

    1985-01-01

    This is the 10th annual report of the US Nuclear Regulatory Commission (NRC). This report covers the major activities, events, decisions and planning that took place during fiscal year 1984 (October 1983 through September 1984) within the NRC or involving the NRC. Information is presented concerning 1984 highlights and planning for 1985; reactor regulation; cleanup at Three Mile Island Unit 2; operational experience; nuclear materials; safeguards; waste management; inspection, enforcement, quality assurance, and emergency preparedness; cooperation with the States; international programs; nuclear regulatory research; proceedings and litigation; and management and communication

  2. Indexes to Nuclear Regulatory Commission issuances, January--June 1993

    International Nuclear Information System (INIS)

    1993-11-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: (1) Case Name Index; (2) Digests and Headers; (3) Legal Citations Index; (4) Subject Index; (5) Facility Index

  3. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1980-02-01

    This first supplement to the second edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board and Atomic Safety and Licensing Board decisions issued during the period from April 1, 1978 to September 30, 1978 interpreting the NRC's Rules of Practice in 10 CFR Part 2. The supplement also includes additional material from adjudicatory decisions rendered prior to April 1, 1978 and, to a very limited degree, material from adjudicatory decisions and regulation changes after September 30, 1978. The supplement, which is intended to be used as a pocket-part supplement to the Digest itself, includes a number of new subsections and topics not covered in the Digest. The new subsections are noted in the index for the supplement

  4. Nuclear Regulatory Commission issuances. Volume 17, No. 3

    International Nuclear Information System (INIS)

    1983-03-01

    This report contains the Issuances received during March 1983 from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors Decisions (DD), and the Denials of Petition for Rulemaking (DPRM). The Issuances concerned the following facilities: Three Mile Island Nuclear Station, Unit No. 1; Comanche Peak Steam Electric Station, Units 1 and 2; Vallecitos Nuclear Center; Floating Nuclear Power Plants; San Onofre Nuclear Generating Station, Units 2 and 3; Point Beach Nuclear Plant, Unit 1; Perry Nuclear Power Plant, Units 1 and 2; Shoreham Nuclear Power Station, Unit 1; Western New York Nuclear Service Center; Limerick Generating Station, Units 1 and 2; Seabrook Station, Units 1 and 2; Black Fox Station, Units 1 and 2; WmH Zimmer Nuclear Power Station, Unit 1; WPPSS Nuclear Project No. 1; Zion Nuclear Plant, Units 1 and 2; and South Texas Project, Units 1 and 2

  5. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    International Nuclear Information System (INIS)

    Kostova, M.; Howard, D.; Elder, P.

    2013-01-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  6. Regulatory challenges related to the licensing of a new nuclear power plant

    International Nuclear Information System (INIS)

    Maris, M.

    2010-01-01

    Assuring the safety and security of nuclear power plants is recognized world-wide as a challenge for all stakeholders. Particular attention goes to plants planned to be built in countries with not sufficiently developed industrial and regulatory infrastructure and experience. A construction and commissioning project, which is usually an international undertaking, gives opportunities to all national stakeholders to develop further their organisations and competences. In the present paper the duties of a regulatory body are recalled as well as the human resources and competences needed for the licensing of a new nuclear power plant. The regulatory body and its technical safety organization(s) should be strengthened and the international cooperation should contribute to this in a systematic and coordinated way. In particular, the donor country should support the necessary development of the regulatory competences and of an effective safety assessment process supporting the national licensing process. Appropriate support can be provided by the International Atomic Energy Agency (IAEA) and through other bi-lateral or multi-lateral programmes

  7. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    Energy Technology Data Exchange (ETDEWEB)

    Kostova, M.; Howard, D.; Elder, P. [Directorate of Nuclear Cycle and Facilities Regulation, Canadian Nuclear Safety Commission, 280, Slater Street, Ottawa, Ontario K1P 5S9 (Canada)

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  8. Nuclear Regulatory Commission issuances, Volume 44, No. 4

    International Nuclear Information System (INIS)

    1996-10-01

    This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  9. Indexes to Nuclear Regulatory Commission Issuances, January--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report indexes the issuances heard and ruled upon from January through June 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Information provided for each case includes the case name, full test reference, issuance number, issues raised by appellants, legal citations, facility name and docket number, subject matter of issues and/or rulings, type of hearing, and type of issuance. Each issuance is displayed in one or more of five separate formats: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index.

  10. Indexes to Nuclear Regulatory Commission Issuances, January--June 1997

    International Nuclear Information System (INIS)

    1997-01-01

    This report indexes the issuances heard and ruled upon from January through June 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Information provided for each case includes the case name, full test reference, issuance number, issues raised by appellants, legal citations, facility name and docket number, subject matter of issues and/or rulings, type of hearing, and type of issuance. Each issuance is displayed in one or more of five separate formats: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index

  11. Nuclear Regulatory Commission Issuances, Volume 44, No. 5

    International Nuclear Information System (INIS)

    1996-11-01

    This report includes the issuances received in November 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. Seven issuances were received and are abstracted individually in the database: Emerick S. McDaniel, U.S. Enrichment Corporation, Sequoyah Fuels Corporation and General Atomics, all power reactor licensees, Florida Power and Light Company, Maine Yankee Atomic Power Company, and Northern States Power Company. No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking

  12. Nuclear Regulatory Commission issuances, Volume 44, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report includes the issuances received in October 1996. Issuances are from the Commission, the Atomic Safety and Licensing Boards, and the Directors` Decisions. 15 issuances were received and are abstracted individually in the database: Louisiana Energy Services, U.S. Enrichment Corporation, Yankee Atomic Electric Company, General Public Utilities Nuclear Corporation, James L. Shelton, Juan Guzman, Northern States Power Company, TESTCO Inc., Washington Public Power Supply System, all nuclear plants, Cleveland Electric Illuminating Company, Duke Power Company, Florida Power Corporation, and Northeast Nuclear Energy Company (2 issuances). No issuances were received from the the Administrative Law Judges or the Decisions on Petitions for Rulemaking.

  13. The Canadian Nuclear Safety Commission regulatory process for decommissioning a uranium mining facility

    International Nuclear Information System (INIS)

    Scissons, K.; Schryer, D.M.; Goulden, W.; Natomagan, C.

    2002-01-01

    The Canadian Nuclear Safety Commission (CNSC) regulates uranium mining in Canada. The CNSC regulatory process requires that a licence applicant plan for and commit to future decommissioning before irrevocable decisions are made, and throughout the life of a uranium mine. These requirements include conceptual decommissioning plans and the provision of financial assurances to ensure the availability of funds for decommissioning activities. When an application for decommissioning is submitted to the CNSC, an environmental assessment is required prior to initiating the licensing process. A case study is presented for COGEMA Resources Inc. (COGEMA), who is entering the decommissioning phase with the CNSC for the Cluff Lake uranium mine. As part of the licensing process, CNSC multidisciplinary staff assesses the decommissioning plan, associated costs, and the environmental assessment. When the CNSC is satisfied that all of its requirements are met, a decommissioning licence may be issued. (author)

  14. Steam Generator tube integrity -- US Nuclear Regulatory Commission perspective

    International Nuclear Information System (INIS)

    Murphy, E.L.; Sullivan, E.J.

    1997-01-01

    In the US, the current regulatory framework was developed in the 1970s when general wall thinning was the dominant degradation mechanism; and, as a result of changes in the forms of degradation being observed and improvements in inspection and tube repair technology, the regulatory framework needs to be updated. Operating experience indicates that the current U.S. requirements should be more stringent in some areas, while in other areas they are overly conservative. To date, this situation has been dealt with on a plant-specific basis in the US. However, the NRC staff is now developing a proposed steam generator rule as a generic framework for ensuring that the steam generator tubes are capable of performing their intended safety functions. This paper discusses the current U.S. regulatory framework for assuring steam generator (SG) tube integrity, the need to update this regulatory framework, the objectives of the new proposed rule, the US Nuclear Regulatory Commission (NRC) regulatory guide (RG) that will accompany the rule, how risk considerations affect the development of the new rule, and some outstanding issues relating to the rule that the NRC is still dealing with

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  16. Improved cost-benefit techniques in the US Nuclear Regulatory Commission

    Energy Technology Data Exchange (ETDEWEB)

    Cronin, F.J.; Nesse, R.J.; Vaeth, M.; Wusterbarth, A.R.; Currie, J.W.

    1983-06-01

    The major objective of this report is to help the US Nuclear Regulatory Commission (NRC) in its regulatory mission, particularly with respect to improving the use of cost-benefit analysis and the economic evaluation of resources within the NRC. The objectives of this effort are: (1) to identify current and future NRC requirements (e.g., licensing) for valuing nonmarket goods; (2) to identify, highlight, and present the relevant efforts of selected federal agencies, some with over two decades of experience in valuing nonmarket goods, in this area; and (3) to review methods for valuing nonmarket impacts and to provide estimats of their magnitudes. Recently proposed legislation may result in a requirement for not only more sophisticated valuation analyses, but more extensive applications of these techniques to issues of concern to the NRC. This paper is intended to provide the NRC with information to more efficiently meet such requirements.

  17. U.S. Nuclear Regulatory Commission fiscal year 1980 supplemental budget request

    International Nuclear Information System (INIS)

    1979-01-01

    The proposed supplemental will enable the Nuclear Regulatory Commission to implement necessary additional effort arising from the agency's assessment of the accident at the Three Mile Island Unit 2 facility on March 28, 1979. The TMI accident has had a major impact on all NRC program areas, in particular on research activities and reactor operations. In addition, funds are requested to enhance the agency's Waste Management program to reflect the recommendations of the President's Interagency Review Group on Waste Management. Specific activities involved in this effort will include developing regulatory guidance, developing a licensing review capability and completing a plan for the site characterization review, all in support of the preparation of NRC guidelines necessary to conduct a construction authorization review. FY 1980 appropriations did not include funds to cover these requirements. A detailed analysis across program lines of the supplemental request is contained in this report

  18. United States nuclear regulatory commission program for inspection of decommissioning nuclear power plants

    International Nuclear Information System (INIS)

    Harris, P.W.

    2001-01-01

    The United States Nuclear Regulatory Commission (USNRC or Commission) has been inspecting decommissioning commercial nuclear power plants in the United States (U.S.) since the first such facility permanently shutdown in September 1967. Decommissioning inspections have principally focused on the safe storage and maintenance of spent reactor fuel; occupational radiation exposure; environmental radiological releases; the dismantlement and decontamination of structures, systems, and components identified to contain or potentially contain licensed radioactive material; and the performance of final radiological survey of the site and remaining structures to support termination of the USNRC-issued operating license. Over the last 5 years, USNRC inspection effort in these areas has been assessed and found to provide reasonable confidence that decommissioning can be conducted safely and in accordance with Commission rules and regulations. Recently, the staff has achieved a better understanding of the risks associated with particular decommissioning accidents 1 and plans to apply these insights to amendments proposed to enhance decommissioning rules and regulations. The probabilities, scenarios, and conclusions resulting from this effort are being assessed as to their applicability to the inspection of decommissioning commercial power reactors. (author)

  19. United States nuclear regulatory commission program for inspection of decommissioning nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Harris, P.W. [U.S. Nuclear Regulatory Commission, Washington, DC (United States)

    2001-07-01

    The United States Nuclear Regulatory Commission (USNRC or Commission) has been inspecting decommissioning commercial nuclear power plants in the United States (U.S.) since the first such facility permanently shutdown in September 1967. Decommissioning inspections have principally focused on the safe storage and maintenance of spent reactor fuel; occupational radiation exposure; environmental radiological releases; the dismantlement and decontamination of structures, systems, and components identified to contain or potentially contain licensed radioactive material; and the performance of final radiological survey of the site and remaining structures to support termination of the USNRC-issued operating license. Over the last 5 years, USNRC inspection effort in these areas has been assessed and found to provide reasonable confidence that decommissioning can be conducted safely and in accordance with Commission rules and regulations. Recently, the staff has achieved a better understanding of the risks associated with particular decommissioning accidents 1 and plans to apply these insights to amendments proposed to enhance decommissioning rules and regulations. The probabilities, scenarios, and conclusions resulting from this effort are being assessed as to their applicability to the inspection of decommissioning commercial power reactors. (author)

  20. LIPAc personnel protection system for realizing radiation licensing conditions on injector commissioning with deuteron beam

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Hiroki, E-mail: takahashi.hiroki@jaea.go.jp [IFMIF/EVEDA Accelerator Group, Japan Atomic Energy Agency (JAEA), Rokkasho, Aomori (Japan); Narita, Takahiro; Kasugai, Atsushi [IFMIF/EVEDA Accelerator Group, Japan Atomic Energy Agency (JAEA), Rokkasho, Aomori (Japan); Kojima, Toshiyuki [Gitec Co. Ltd., Hachinohe, Aomori (Japan); Marqueta, Alvaro; Nishiyama, Koichi [IFMIF/EVEDA Project Team, Rokkasho, Aomori (Japan); Sakaki, Hironao [Quantum Beam Science Center, JAEA, Kizu, Kyoto (Japan); Gobin, Raphael [Commissariat à l’Energie Atomique et aux Energies Alternatives, CEA/Saclay, DSM/IRFU, Gif/Yvette (France)

    2016-11-01

    Highlights: • Personnel Protection System (PPS) is developed to adapt the radiation licensing. • PPS achieves the target performance to secure the personnel safety. • Pulse Duty Management System (PDMS) is developed to manage the beam-operation-time. • Satisfying performance of PDMS is confirmed by injector operation with H+ beam. • By the result of PPS and PDMS tests, the radiation license was successfully obtained. - Abstract: The performance validation of the Linear IFMIF Prototype Accelerator (LIPAc), up to the energy of 9 MeV deuteron beam with 125 mA continuous wave (CW), is planned in Rokkasho, Japan. There are three main phases of LIPAc performance validation: Injector commissioning, RFQ commissioning and LIPAc commissioning. Injector commissioning was started by H{sup +} and D{sup +} beam. To apply the radiation licensing for the Injector commissioning, the entering/leaving to/from accelerator vault should be under control, and access to the accelerator vault has to be prohibited for any person during the beam operation. The Personnel Protection System (PPS) was developed to adapt the radiation licensing conditions. The licensing requests that PPS must manage the accumulated D{sup +} current. So, to manage the overall D{sup +} beam time during injector operation, Pulse Duty Management System (PDMS) was developed as a configurable subsystem as part of the PPS. The PDMS was tested during H{sup +} beam (as simulated D{sup +}) operation, to confirm that it can handle the beam inhibit from Injector before the beam accumulation is above the threshold value specified in the radiation licensing condition. In this paper, the design and configuration of these systems and the result of the tests are presented.

  1. Canada's regulatory framework: The Canadian Nuclear Safety Commission's regulatory framework

    International Nuclear Information System (INIS)

    Howard, D.

    2011-01-01

    This paper will discuss the Canadian Nuclear Safety Commission and Canada's Regulatory Framework with respect to Low- and Intermediate-Level Radioactive Waste. The management of low and intermediate level radioactive waste must be ensured in a consistent, environmentally responsible and economical manner throughout its lifecycle -- from its production to the final disposal option. Radioactive waste has been produced in Canada since the early 1930s when the first radium/uranium mine began operating at Port Radium in the Northwest Territories. Pitchblende ore was transported from the Port Radium mine to Port Hope, Ontario where it was refined to produce radium for medical purposes. At present, radioactive waste is generated in Canada from the various stages and uses associated with the nuclear fuel cycle from uranium mining/milling to nuclear reactor operations to radioisotope manufacture and use. The Canadian Nuclear Safety Commission (CNSC regulates the use of nuclear energy and materials to protect the health, safety and security of Canadians and the environment; and to implement Canada's international commitments on the peaceful use of nuclear energy. The CNSC was established in 2000 under the Nuclear Safety and Control Act and reports to Parliament through the Minister of Natural Resources. The CNSC was created to replace the former Atomic Energy Control Board (AECB), which was founded in 1946. Under the Nuclear Safety and Control Act, CNSC's mandate involves four major areas: regulation of the development, production and use of nuclear energy in Canada to protect health, safety and the environment; regulation of the production, possession, use and transport of nuclear substances, and the production, possession and use of prescribed equipment and prescribed information; implementation of measures respecting international control of the development, production, transport and use of nuclear energy and substances, including measures respecting the

  2. Risk Assessment Review Group report to the U.S. Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Lewis, H.W.; Budnitz, R.J.; Kouts, H.J.C.; Loewenstein, W.B.; Rowe, W.D.; von Hippel, F.; Zachariasen, F.

    1978-09-01

    The Risk Assessment Review Group was organized by the U.S. Nuclear Regulatory Commission on July 1, 1977, with four elements to its charter: clarify the achievements and limitations of WASH-1400, the ''Rasmussen Report''; assess the peer comments thereon, and responses to those comments; study the present state of such risk assessment methodology; and recommend to the Commission how (and whether) such methodology can be used in the regulatory and licensing process. Areas of study include: risk assessment methodologies; statistical issues; completeness; the data base; and the WASH-1400 assessment of the damage to human health from radiation after a postulated accident. Specific items discussed include: Browns Ferry; common cause failure; human factors; format and scrutability; the peer review process; earthquakes; risk perception; allegations by UCS concerning WASH-1400 treatment of quality assurance and quality control; current role of probabilistic methods in the regulatory process; acts of violence; ATWS; influence of design defects in quality assurance failures; and calculation of population doses from given releases of radionuclides

  3. Nuclear Regulatory Commission issuances. Volume 40, Number 5

    International Nuclear Information System (INIS)

    1994-11-01

    This book contains issuances of the Atomic Safety and Licensing Boards for November 1994. The issuances include Cameo Diagnostic Centre, Inc. byproduct material license; Georgia Power Company license amendment, transfer to Southern Nuclear for Vogtle Electric Generating Plant, units 1 and 2; Indiana Regional Cancer Center, order modifying and suspending byproduct material license; Louisiana Energy Services, special nuclear material license; Pacific Gas and Electric Company, construction period recovery, facility operating license, Diablo Canyon Nuclear Power plant; and Sequoyah Fuels Corporation, source materials license

  4. Indexes to Nuclear Regulatory Commission issuances, July--December 1992

    International Nuclear Information System (INIS)

    1993-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Legal Citations Index, Subject Index, and Facility Index. Subject words and/or phrases arranged alphabetically, indicate the issues and subjects covered in the issuances. The subject headings are followed by phrases that give specific information about the subject, as discussed in the issuances being indexed. These phrases are followed by the issuance number and the full text reference

  5. Indexes to Nuclear Regulatory Commission issuances, July--September 1992

    International Nuclear Information System (INIS)

    1993-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: 1. Case Name Index: The case name index is an alphabetical arrangement of the case names of the issuances. Each case name is followed by the type of hearing, the type of issuance, docket number, issuance number, and full text reference. 2. Digests and Headers: The headers and digests are presented in issuance number order as follows: the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The header identifies the issuance by issuance number, case name, facility name, docket number, type of hearing, date of issuance, and type of issuance. 3. Legal Citations Index: This index is divided into four parts and consists of alphabetical or alpha-numerical arrangements of Cases, Regulations, Statutes, and Others. These citations are listed as given in the issuances. Changes in regulations and statutes may have occurred to cause changes in the number or name and/or applicability of the citation. It is therefore important to consider the date of the issuance. 4. Subject Index: Subject words and/or phrases, arranged alphabetically, indicate the issues and subjects covered in the issuances. 5. Facility Index: The index consists of an alphabetical arrangement of facility names from the issuance. The name is followed by docket number, type of hearing, data, type of issuance, issuance number, and full text reference

  6. 14 CFR 1204.506 - Delegation of authority to license the use of the Centennial of Flight Commission name.

    Science.gov (United States)

    2010-01-01

    ... of the Centennial of Flight Commission name. 1204.506 Section 1204.506 Aeronautics and Space NATIONAL....506 Delegation of authority to license the use of the Centennial of Flight Commission name. (a... 9 of the Centennial of Flight Commemoration Act, as amended (Pub. L. 105-389) to license the use of...

  7. License renewal of the HFR research reactor - A regulatory view

    International Nuclear Information System (INIS)

    Van der Plas, Y.

    2006-01-01

    Full text: Regulatory policy in The Netherlands is having safety evaluations of a nuclear installation each ten year. Recently a periodic safety evaluation has been finished on the 45 MW High Flux Reactor (HFR) in Petten divided over the following main topics: Risk Scoping Study; HEU-LEU fuel conversion; Evaluation against a pre-defined Reference Licensing Basis; Ageing study. The Risk Scoping Study is a limited probabilistic safety assessment showing scenarios towards serious core degradation and their probabilities. Individual risks for members of the public induced by the incidents analyzed in the first phase are compared with the mortality limits and probabilistic doses limits of the national BKSE decree. For non- proliferation reasons the fuel is converted from high to low enriched uranium. Before starting the project a reference licensing basis (RLB) was defined. A list of postulated initiating events (PIEs), re-establishing a design basis has been approved. An ageing management system shall provide information on the actual status and the residual life time of the plant. The evaluation results into a list of deficiencies, recommendations and suggestions from which modifications are to be proposed. Examples are: more redundancy and separation within the reactor protection system; renewal of the emergency and decay heat cooling; addition of a secundary reactor shut down system; more redundancy in the electric power supply; addition of injection valves introducing efficient use of passive cooling inventor) under LOCA conditions; damping of the impact from loads accidentally falling into the pool. A new nuclear license was issued begin 2004, covering all modifications which are to be implemented ultimate end 2007

  8. U.S. Department of Energy & Nuclear Regulatory Commission Advanced Fuel Cycle Research & Development Seminar Series FY 2007 & 2008

    Energy Technology Data Exchange (ETDEWEB)

    Grandy, Christopher [Argonne National Lab. (ANL), Argonne, IL (United States)

    2008-08-01

    In fiscal year 2007, the Advanced Burner Reactor project initiated an educational seminar series for the Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) personnel on various aspects of fast reactor fuel cycle closure technologies. This important work was initiated to inform DOE and NRC personnel on initial details of sodium-cooled fast reactor, separations, waste form, and safeguard technologies being considered for the Advanced Fuel Cycle Research and Development program, and to learn the important lesson from the licensing process for the Clinch River Breeder Reactor Plant that educating the NRC staff early in the regulatory process is very important and critical to a project success.

  9. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  10. 17 CFR 201.421 - Commission consideration of determinations by self-regulatory organizations.

    Science.gov (United States)

    2010-04-01

    ... determinations by self-regulatory organizations. 201.421 Section 201.421 Commodity and Securities Exchanges... Commission Review § 201.421 Commission consideration of determinations by self-regulatory organizations. (a..., order review of any determination by a self-regulatory organization that could be subject to an...

  11. 75 FR 54917 - Criteria for Nominating Materials Licensees for the U.S. Nuclear Regulatory Commission's Agency...

    Science.gov (United States)

    2010-09-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0294] Criteria for Nominating Materials Licensees for the U.S. Nuclear Regulatory Commission's Agency Action Review Meeting AGENCY: Nuclear Regulatory Commission. ACTION: Request for comment. SUMMARY: It is the policy of the U.S. Nuclear Regulatory Commission...

  12. Conduct of regulatory review and assessment during the licensing process for nuclear power plants

    International Nuclear Information System (INIS)

    1980-01-01

    This Safety Guide was prepared as part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to nuclear power plants. It supplements the Code of Practice on Governmental Organization for the Regulation of Nuclear Power Plants (IAEA Safety Series No. 50-C-G) and is concerned with the review and assessment by the regulatory body of all information submitted in support of licence applications, in the various phases of the licensing process. The purpose of the Guide is to provide information, recommendations and guidance for the conduct of these activities. The scope of the review and assessment will encompass the safety aspects of siting, construction, commissioning, operation and decommissioning of each nuclear power plant

  13. Improving regulatory effectiveness in federal/state siting actions: water supplies and the nuclear licensing process

    International Nuclear Information System (INIS)

    Davenport, F.S.

    1977-07-01

    The Interstate Conference on Water Problems (ICWP) is a national association of State, intrastate, and interstate officials concerned with water resources administration and related matters. The Conference was established in 1959 as an outgrowth of regional conferences on water problems as recognized in the same year by action of the General Assembly of the States. This report was produced by the Interstate Conference on Water Problems in an effort to provide a compilation and summary of the views of selected States regarding relationships of water supplies to the nuclear power plant licensing process. This publication does not represent the official position of the U.S Water Resources Council, or the U.S. Nuclear Regulatory Commission, nor does it represent the position of any single state or the ICWP

  14. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  15. On the “non-discrimination” aspect of FRAND licensing: A response to the Indian Competition Commission's recent orders

    Directory of Open Access Journals (Sweden)

    David J. Teece

    2018-03-01

    Full Text Available The Indian Competition Commission has recently challenged Ericsson's practice of licensing its standards-essential patents (SEPs, relating to cellular standards, for percentage-based royalties based on the selling prices of the end-user licensed products. Ericsson had committed to the relevant standards-development organisation that it would license its SEPs on “fair, reasonable and non-discriminatory” (“FRAND” terms. The Commission contends that such royalties are “prima facie discriminatory” in violation of the Competition Act, in the (novel sense that different products selling for different prices pay different per-unit royalties. We analyse the broader implications of the Commission's reasoning, concerned that if adopted, the Commission's reasoning would disrupt common industry licensing practices. Keywords: Patents, Licensing, Discrimination, Telecommunications, FRAND, Standards, Industry practice

  16. Demonstration of a repository performance assessment capability at the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Codell, R.; Eisenberg, N.; McCartin, T.; Park, J.

    1991-01-01

    In order to better review licensing submittals for a High-Level Waste Repository, the US Nuclear Regulatory Commission staff has expanded and improved its capability to conduct performance assessments. A demonstration of this capability used the limited data from Yucca Mountain, Nevada to investigate a small set of scenario classes. Models of release and transport of radionuclides from a repository via the groundwater and direct release pathways provided preliminary estimates of releases to the accessible environment for a 10,000 year simulation time. Latin hypercube sampling of input parameters was used to express results as distributions and to investigate model sensitivities. This methodology demonstration should not be interpreted as an estimate of performance of the proposed repository at Yucca Mountain, Nevada

  17. Nuclear Regulatory Commission and its role in environmental standards

    International Nuclear Information System (INIS)

    Mattson, R.J.

    1976-01-01

    The NRC and its predecessors in the Atomic Energy Commission represent considerable experience in environmental standards setting. The Atomic Energy Act of 1954, the 1970 Supreme Court decision on Federal pre-emption of radiation standards, the Calvert Cliffs decision of 1971, the Energy Reorganization Act of 1974, and the Appendix I ''as low as reasonably achievable'' decision of 1975, to name a few of our landmarks, are representative of the scars and the achievements of being in a role of national leadership in radiation protection. The NRC, through a variety of legislative authorities, administrative regulations, regulatory guides, and national consensus standards regulates the commercial applications of nuclear energy. The purposes of regulation are the protection of the environment, public health and safety, and national security. To understand NRC's responsibilities relative to those of other Federal and state agencies concerned with environmental protection, we will briefly review the legislative authorities which underlie our regulatory program. Then we will examine the intent or the spirit of that program as embodied in our system of regulations, guides, and standards. Finally we will speak to what's happening today and what we see in the future for environmental standards

  18. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  19. List of Nuclear Materials Licensing Actions Received

    Data.gov (United States)

    Nuclear Regulatory Commission — A catalog of all Materials Licensing Actions received for review. The catalog lists the name of the entity submitting the license application, their city and state,...

  20. Nuclear Regulatory Commission Issuances. Volume 42, No. 1, Pages 1--45

    International Nuclear Information System (INIS)

    1995-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  1. The Nuclear Regulatory Commission's research reactor inspection program

    International Nuclear Information System (INIS)

    Constable, George L.

    1977-01-01

    The Division of Reactor Inspection Program's functional responsibilities are presented. The include (a) inspections and investigations necessary to determine whether licensees are complying with license provisions and rules, and to ascertain whether licensed operations are being conducted safely; (b) establishment of bases for the issuance or denial of a construction permit or license; (c) investigation of accidents, incidents, and theft or diversion of special nuclear materials; (d) enforcement actions; and (e) evaluation of licensed operations as a basis for recommending changes to standards and license conditions and for issuance of reports to the nuclear industry and the public

  2. Indexes to Nuclear Regulatory Commission issuances, July-September 1981. Index 1

    International Nuclear Information System (INIS)

    1981-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  3. Indexes to Nuclear Regulatory Commission issuances, January 1, 1980--December 31, 1985

    International Nuclear Information System (INIS)

    1989-11-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document

  4. Indexes to Nuclear Regulatory Commission issuances, July-December 1985. Volume 22, Index 2

    International Nuclear Information System (INIS)

    1986-03-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document

  5. Indexes to Nuclear Regulatory Commission issuances, July-September 1982. Vol. 16. Index 1

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  6. 77 FR 9273 - WORKSHOP Sponsored by the Nuclear Regulatory Commission and the Electric Power Research Institute...

    Science.gov (United States)

    2012-02-16

    ... Commission and the Electric Power Research Institute on the Treatment of Probabilistic Risk Assessment.... SUMMARY: The U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research (RES), in cooperation with the Electric Power Research Institute (EPRI), will hold a joint workshop on the Treatment of...

  7. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Science.gov (United States)

    2011-10-04

    ...-2016 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment... comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and...

  8. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Science.gov (United States)

    2012-03-14

    ... 2008-2013 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Strategic plan. SUMMARY: The U...-1614, Volume 5, ``U.S. Nuclear Regulatory Commission, Fiscal Years [FY] 2008-2013 Strategic Plan,'' dated February 2012. The updated FY 2008-2013 strategic plan describes the agency's mission and...

  9. Regional and International Networking to Support the Energy Regulatory Commission of Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Lavansiri, Direk; Bull, Trevor

    2010-09-15

    The Energy Regulatory Commission of Thailand is a new regulatory agency. The structure of the energy sector; the tradition of administration; and, the lack of access to experienced personnel in Thailand all pose particular challenges. The Commission is meeting these challenges through regional and international networking to assist in developing policies and procedures that allow it to meet international benchmarks.

  10. U.S. regulatory requirements for nuclear plant license renewal: The B and W Owners Group License Renewal Program

    International Nuclear Information System (INIS)

    Staudinger, Deborah K.

    2004-01-01

    This paper discusses the current U.S. Regulatory Requirements for License Renewal and describes the Babcock and Wilcox Owners Group (B and WOG) Generic License Renewal Program (GLRP). The B and W owners, recognizing the need to obtain the maximum life for their nuclear generating units, embarked on a program to renew the licenses of the seven reactors in accordance with the requirements of the Atomic Energy Act of 1954 and further defined by Title 10 of the Code of Federal Regulation Part 54 (10 CFR 54). These reactors, owned by five separate utilities, are Pressurized Water Reactors (PWR) ranging in net rated capacity from approximately 800 to 900 MW. The plants, predominately constructed in the 70s, have USNRC Operating Licenses that expire between 2013 to 2017. (author)

  11. The EU commission and national governments as partners: EC regulatory expansion in telecommunications 1979-2000

    OpenAIRE

    Mark Thatcher

    2001-01-01

    Explicitly or implicitly, general models of European integration claim that EC regulatory expansion involves a struggle for power between Commission and national governments. The Commission is seen as a policy entrepreneur, taking the initiative to drive forward integration (Sandholtz and Zysman 1989). It seeks regulatory expansion due to constraints on its expenditure (Majone 1996, ch4). Neo-functionalists emphasise the Commission's ability to expand its role against the wishes of government...

  12. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  13. Legislative and regulatory aspects of nuclear power reactor licensing in the U.S.A

    International Nuclear Information System (INIS)

    Malsch, M.G.

    1976-01-01

    An explanation of the origins, statutory basis and development of the present regulatory system in the US. A description of the various actions which must be taken by a license applicant and by the USNRC before a nuclear power plant can be constructed and placed on-line. Account of the current regulatory practices followed by the USNRC in licensing nuclear power reactors. (orig./HP) [de

  14. Experience in Cuba in the licensing during import, commissioning and operation of an Irradiator LLCo ISOGAMMA

    International Nuclear Information System (INIS)

    Forteza, Yamil Lopez; Reyes, Yolanda Perez; Garcia, Jose R. Quevedo; Molina, Igor I. Sarabia; Gonzalez, Leonel Omarovich; Zubiaur, Omar Cruz

    2013-01-01

    This work presented the experiences during the process of licensing an irradiator ISOGAMMA LLCo model according to the recommendations of the International Atomic Energy (IAEA). Aspects of the safety assessment are detailed, as well as control and verification requirements for radiation safety and security at different stages of the process (import, transportation, installation irradiator loading 60Co sources, commissioning and operation) of irradiator recently installed in Cuba. The results of the evaluation carried a source of reference and consultation necessary for the work of the regulator to consider for similar processes that lie ahead in other facilities irradiation

  15. Nuclear knowledge portal to support licensing and control nuclear activities in the Brazilian Nuclear Energy Commission

    International Nuclear Information System (INIS)

    Gomes, Elizabeth; Braga, Fabiane

    2004-01-01

    importance of keeping the intellectual capital in the organizations that is to work with the knowledge from the collaborators. In Brazil still have many authors that discusses this concept and we adopt for this paper the definition form Cavalcanti where is the concept 'intellectual capital' refers either to the capacity, ability or experience, as well as to the formal education that the collaborators members have and add to the Organization. The 'intellectual capital' is an intangible asset, which belongs to the individual himself, thus it might be utilized by the organizations in order to generate value. The development and preservation of this intellectual capital is made through the implementation of forums of discussion, workshops or knowledge portals where the organization's collaborators share their experiences. Nevertheless, to assimilate and to develop the 'intellectual capital' does not add value to the organization: It is necessary to keep it. And one way to do so is to create desirable and encouraging work environments, to promote a sharing management and to offer programs of profits sharing. The objective of this paper is to describe how Brazilian Nuclear Energy Commission - CNEN has been developing a nuclear knowledge portal, focused in the Radiation and Safety Nuclear area. The Brazilian Nuclear Energy Commission (CNEN) is a federal autarchy created in October 10 of 1956, as a superior agency of planning, guiding, supervision and inspection in nuclear area being also the body entitled to establish standards and regulations on radiological protection, to issue licenses (permissions) and to survey and control the nuclear activities in Brazil. CNEN also develops researches related to the use of nuclear techniques in benefit of the society. The Radiation and Safety Nuclear directorate of CNEN acts, mainly, in the licensing of nuclear and radioactive installations. The people who work at this area recognize the importance of management and sharing the accumulated

  16. 77 FR 26321 - Reed College, Reed Research Nuclear Reactor, Renewed Facility Operating License No. R-112

    Science.gov (United States)

    2012-05-03

    ... Nuclear Reactor, Renewed Facility Operating License No. R-112 AGENCY: Nuclear Regulatory Commission... Commission (NRC or the Commission) has issued renewed Facility Operating License No. R- 112, held by Reed... License No. R-112 will expire 20 years from its date of issuance. The renewed facility operating license...

  17. Nuclear Regulatory Commission issuances, January 1995. Volume 41, Number 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    This book contains issuances of the Atomic Safety and Licensing Boards for January 1995. The issuances include Babcock and Wilcox Company materials license; Hydro Resources, Inc. application for uranium mining; low-level waste storage in Utah; communication of emerging and existing generic, technical issues with PWR owners groups; and radioactive waste management by Sierra Nuclear Corporation.

  18. Nuclear Regulatory Commission issuances, January 1995. Volume 41, Number 1

    International Nuclear Information System (INIS)

    1995-01-01

    This book contains issuances of the Atomic Safety and Licensing Boards for January 1995. The issuances include Babcock and Wilcox Company materials license; Hydro Resources, Inc. application for uranium mining; low-level waste storage in Utah; communication of emerging and existing generic, technical issues with PWR owners groups; and radioactive waste management by Sierra Nuclear Corporation

  19. Implementing 'Continuous Improvement' in the U.S. Nuclear Regulatory Commission's Decommissioning Program

    International Nuclear Information System (INIS)

    Orlando, D. A.; Buckley, J. T.; Johnson, R. L.; Gillen, D. M.

    2006-01-01

    The United States Nuclear Regulatory Commission's (US NRC's) comprehensive decommissioning program encompasses the decommissioning of all US NRC licensed facilities, ranging from the termination of routine licenses for sealed sources, to the closure of complex materials sites and nuclear power reactor facilities. Of the approximately 200 materials licenses that are terminated each year, most are routine and require little, if any, remediation to meet the US NRC unrestricted release criteria. However, some present technical and policy challenges that require large expenditures of resources, including a few complex materials sites that have requested license termination under the restricted-use provisions of 10 CFR 20.1403. Fiscal constraints to reduce budgeted resources in the decommissioning program, as well as concerns over the time to complete the decommissioning process have led to actions to improve the program and use resources more efficiently. In addition, the US NRC's Strategic Plan requires efforts to identify and implement improvements to US NRC programs in order to improve efficiency, effectiveness, timeliness, and openness, of the US NRC's activities, while maintaining the necessary focus on safety. Decommissioning regulations, and more recently the analysis of several issues associated with implementing those regulations, also have been significant catalysts for improvements in the decommissioning program. Actions in response to these catalysts have resulted in a program focused on the management of complex sites in a comprehensive, consistent, and risk-informed manner, as opposed to the past practice of focusing on sites deemed to be problematic. This paper describes the current status of the decommissioning of US NRC-licensed nuclear facilities, including an overview of recent decommissioning project completion efforts. It provides a detailed summary of past, current, and future improvements in the US NRC decommissioning program including the

  20. NRC's license renewal regulations

    International Nuclear Information System (INIS)

    Akstulewicz, Francis

    1991-01-01

    In order to provide for the continuity of the current generation of nuclear power plant operating licenses and at the same time ensure the health and safety of the public, and the quality of the environment, the US Nuclear Regulatory Commission (NRC) established a goal of developing and issuing regulations and regulatory guidance for license renewal in the early 1990s. This paper will discuss some of those activities underway to achieve this goal. More specifically, this paper will discuss the Commission's regulatory philosophy for license renewal and the two major license renewal rule makings currently underway. The first is the development of a new Part 54 to address procedural and technical requirements for license renewal; the second is a revision to existing Part 51 to exclude environmental issues and impacts from consideration during the license renewal process. (author)

  1. Leak testing United States Nuclear Regulatory Commission type b packaging

    International Nuclear Information System (INIS)

    Lacy, K.A.

    1995-01-01

    The Waste Isolation Pilot Plant (WTPP) is a one of its kind research and development facility operated by the Department of Energy, Carlsbad Area Office. Located in southeastern New Mexico, the WTPP is designed to demonstrate the safe, permanent disposal of transuranic (TRU) radioactive nuclear waste, accumulated from 40 years of nuclear weapons production. Before the waste can be disposed of, it must first be safely transported from generator storage sites to the WIPP. To accomplish this, the TRUPACT-II was designed and fabricated. This double containment, non-vented waste packaging successfully completed a rigorous testing program, and in 1989 received a Certificate of Compliance (C of C) from the Nuclear Regulatory Commission (NRC). Currently, the TRUPACT-II is in use at Idaho National Engineering Laboratory to transport waste on site for characterization. The DOE/CAO is responsible for maintaining the TRUPACT-II C of C. The C of C requires performance of nondestructive examination (NDE), e.g., visual testing (VT), dimensional inspections, Liquid Dye Penetrant testing (PT), and Helium Leak Detection (HLD). The Waste Isolation Division (WID) uses HLD for verification of the containment integrity. The following HLD tests are performed on annual basis or when required, i.e. repairs or component replacement: (1) fabrication verification leak tests on both the outer containment vessel (OCV) and the inner containment vessel (ICV); (2) assembly verification leak tests on the OCV and ICV upper main o-rings; and (3) assembly verification leak tests on the OCV and the ICV vent port plugs. These tests are addressed in detail as part of this presentation

  2. An international comparison of regulatory organizations and licensing procedures for new nuclear power plants

    International Nuclear Information System (INIS)

    Bredimas, Alexandre; Nuttall, William J.

    2008-01-01

    This paper considers measures needed to license new nuclear power plants efficiently. We base our analysis on international standards and a comparison of the national regulatory and licensing framework in seven countries (Canada, France, Germany, Japan, Switzerland, the UK and the USA). We split the review into the organization of regulatory responsibilities and the licensing process. We propose a set of considerations that should be incorporated into national solutions. While conscious of the different cultural fundamentals of each region, we hope this paper will help fuel an emerging debate on this highly topical issue

  3. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  4. Nuclear Regulatory Commission issuances, July 1996: Volume 44, No. 1

    International Nuclear Information System (INIS)

    1996-07-01

    This report includes the issuances received during this period from NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking

  5. US Nuclear Regulatory Commission organization charts and functional statements

    International Nuclear Information System (INIS)

    1996-01-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices

  6. US Nuclear Regulatory Commission organization charts and functional statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  7. 39 CFR Appendix A to Part 3002 - Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate A Appendix A to Part 3002 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION Pt. 3002, App. A Appendix A to Part 3002—Postal Regulatory Commission, Mission Statement of the Office of the Consumer...

  8. 76 FR 62868 - Washington State University; Notice of Issuance of Renewed Facility Operating License No. R-76

    Science.gov (United States)

    2011-10-11

    ...; Notice of Issuance of Renewed Facility Operating License No. R-76 AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance of renewed facility operating license No. R- 76. ADDRESSES: You can access.... Nuclear Regulatory Commission (NRC, the Commission) has issued renewed Facility Operating License No. R-76...

  9. Proposed Activities to Address Regulatory Gaps and Challenges for Licensing Advanced Reactors Using Seismic Isolation

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin Leigh [Idaho National Lab. (INL), Idaho Falls, ID (United States); Kammerer, Annie M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whittaker, Andrew S. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-12-01

    Over the last decade, particularly since implementation of the certified design regulatory approaches outlined in 10 CFR 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” interest has been increasing in the use of seismic isolation (SI) technology to support seismic safety in nuclear facilities. In 2009, the United States (U.S.) Nuclear Regulatory Commission (NRC) initiated research activities to develop new guidance targeted at isolated facilities because SI is being considered for nuclear power plants in the U.S. One product of that research, which was developed around a risk-informed regulatory approach, is a draft NRC NUREG series (NUREG/CR) report that investigates and discusses considerations for use of SI in otherwise traditionally founded large light water reactors (LWRs). A coordinated effort led to new provisions for SI of LWRs in the American Society of Civil Engineers standard ASCE/SEI 4-16, “Seismic Analysis of Safety Related Nuclear Structures.” The risk-informed design philosophy that underpinned development of the technical basis for these documents led to a set of proposed performance objectives and acceptance criteria intended to serve as the foundation for future NRC guidance on the use of SI and related technology. Although the guidance provided in the draft SI NUREG/CR report and ASCE/SEI 4 16 provides a sound basis for further development of nuclear power plant designs incorporating SI, these initial documents were focused on surface-founded or near-surface-founded LWRs and were, necessarily, limited in scope. For example, there is limited information in both the draft NUREG/CR report and ASCE/SEI 4-16 related to nonlinear analysis of soil-structure systems for deeply-embedded reactors, the isolation of components, and the use of vertical isolation systems. Also not included in the draft SI NUREG/CR report are special considerations for licensing of isolated facilities using the certified design approach in 10 CFR

  10. Proposed Activities to Address Regulatory Gaps and Challenges for Licensing Advanced Reactors Using Seismic Isolation

    International Nuclear Information System (INIS)

    Coleman, Justin Leigh; Kammerer, Annie M.; Whittaker, Andrew S.

    2016-01-01

    Over the last decade, particularly since implementation of the certified design regulatory approaches outlined in 10 CFR 52, 'Licenses, Certifications, and Approvals for Nuclear Power Plants,' interest has been increasing in the use of seismic isolation (SI) technology to support seismic safety in nuclear facilities. In 2009, the United States (U.S.) Nuclear Regulatory Commission (NRC) initiated research activities to develop new guidance targeted at isolated facilities because SI is being considered for nuclear power plants in the U.S. One product of that research, which was developed around a risk-informed regulatory approach, is a draft NRC NUREG series (NUREG/CR) report that investigates and discusses considerations for use of SI in otherwise traditionally founded large light water reactors (LWRs). A coordinated effort led to new provisions for SI of LWRs in the American Society of Civil Engineers standard ASCE/SEI 4-16, 'Seismic Analysis of Safety Related Nuclear Structures.' The risk-informed design philosophy that underpinned development of the technical basis for these documents led to a set of proposed performance objectives and acceptance criteria intended to serve as the foundation for future NRC guidance on the use of SI and related technology. Although the guidance provided in the draft SI NUREG/CR report and ASCE/SEI 4 16 provides a sound basis for further development of nuclear power plant designs incorporating SI, these initial documents were focused on surface-founded or near-surface-founded LWRs and were, necessarily, limited in scope. For example, there is limited information in both the draft NUREG/CR report and ASCE/SEI 4-16 related to nonlinear analysis of soil-structure systems for deeply-embedded reactors, the isolation of components, and the use of vertical isolation systems. Also not included in the draft SI NUREG/CR report are special considerations for licensing of isolated facilities using the certified design

  11. Reactor aging research. United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Vassilaros, M.G.

    1998-01-01

    The reactor ageing research activities in USA described, are focused on the research of reactor vessel integrity, including regulatory issues and technical aspects. Current emphasis are described for fracture analysis, embrittlement research, inspection capabilities, validation od annealing rule, revision of regulatory guide

  12. Nuclear Regulatory Commission issuances. Volume 44, Number 3

    International Nuclear Information System (INIS)

    1996-09-01

    This report includes issuances received during September 1996. After reviewing in detail each of the claims made in this informal proceeding the presiding officer sustained the staff of the USNRC in its determination that the applicant did not pass the written portion of his examination to become a licensed operator of a nuclear power plant. In the proceeding concerning citizen group challenges to the decommissioning plan for the Rowe Yankee power station, the licensing board grants licensee Yankee Atomic Electric Company's motion for summary disposition

  13. Nuclear Regulatory Commission issuances. Volume 44, Number 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This report includes issuances received during September 1996. After reviewing in detail each of the claims made in this informal proceeding the presiding officer sustained the staff of the USNRC in its determination that the applicant did not pass the written portion of his examination to become a licensed operator of a nuclear power plant. In the proceeding concerning citizen group challenges to the decommissioning plan for the Rowe Yankee power station, the licensing board grants licensee Yankee Atomic Electric Company`s motion for summary disposition.

  14. Review report: safety and reliability issues on digital instrumentation and control systems in nuclear power plants and United States Nuclear Regulatory Commission`s dispositions

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, Norio; Suzudo, Tomoaki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-09-01

    Recently, digital instrumentation and control (I and C) systems have been applied to nuclear power plants (NPPs) in various countries. Introduction of digital I and C systems, however, raises special issues on design, implementation, safety and licensing. Since FY 1997, the Japan Atomic Energy Research Institute (JAERI) has been carrying out a project, Study on Reliability of Digital I and C Systems, which includes extensive reviews of design approaches, technical standards, regulatory processes, especially, in the United States. This report summarizes the results from the study of National Research Council (NRC) and the U.S. Nuclear Regulatory Commission`s (USNRC`s) responses to the recommendations made by the NRC`s study. That study identified six technical key issues (system aspects of digital I and C technology, software quality assurance, common-mode software failure potential, safety and reliability assessment methods, human factors and man-machine interface, dedication of commercial off-the-shelf hardware and software) and two strategic key issues (case-by-case licensing process, adequacy of technical infrastructure) that arise from the introduction of digital I and C technology and then, made recommendations to the USNRC for coping with digital I and C applications. The USNRC responded to each recommendation and showed their own dispositions in which the USNRC agreed with most of the recommendations. In Japan, it is expected that introduction of digital I and C technology is inevitable in NPPs because the vendors are gradually discontinuing support and stocking of analog components. To cope with such situations, there is a need to develop and update the standards and guidelines applicable to digital I and C technology. The key issues and the USNRC`s dispositions provided in this report is believed to be useful for developing and updating them. (J.P.N.)

  15. Indexes to Nuclear Regulatory Commission issuances, January-June 1984. Vol. 19, Index 2

    International Nuclear Information System (INIS)

    1984-11-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. The information elements are displayed in one or more of five separate formats: case name index, digests and headers, legal citations index, subject index, and facility index

  16. Indexes to Nuclear Regulatory Commission issuances, January-June 1986. Volume 23, Index 2

    International Nuclear Information System (INIS)

    1986-01-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Appeal Panel, the Atomic Safety and Licensing Board Panel, the Administrative Law Judge, the Directors' Decisions, and the Denials of Petitions of Rulemaking are presented in this document. The information elements are displayed in one or more of five separate formats. These formats are case name index, digests and headers, legal citations index, subject index, and facility index

  17. Indexes to Nuclear Regulatory Commission issuances, July-December 1984. Volume 20, Index 2

    International Nuclear Information System (INIS)

    1985-03-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking for the period July-December 1984 are presented in this document. These digests and indexes are intended to serve as a guide to the issuances

  18. Indexes to Nuclear Regulatory Commission Issuances, July-September 1985. Volume 22, Index 1

    International Nuclear Information System (INIS)

    1985-12-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The period from July through September 1985 is covered

  19. Indexes to Nuclear Regulatory Commission issuances, January-March 1984. Volume 19, Index 1

    International Nuclear Information System (INIS)

    1984-01-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Appeal Panel, the Atomic Safety and Licensing Board Panel, the Administrative Law Judge, the Directors' Decisions, and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats: Case Name Index, Digests and Headers, Legal Citations Index, Subject Index, and Facility Index

  20. Indexes to Nuclear Regulatory Commission issuances, January 1, 1986-- December 31, 1990

    International Nuclear Information System (INIS)

    1992-11-01

    Digests and indexes for issuances of the commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. The information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index

  1. Study of the Nuclear Regulatory Commission's Appellate System

    International Nuclear Information System (INIS)

    Bickwit, L.; Malsch, M.; Ostrach, S.; Christenson, K.

    1979-12-01

    At the Chairman's request the Office of the General Counsel studied the Commission's appellate system. The study included examination of the development of the study, analysis of the current workload, investigation of the practices of other agencies, and consideration of alternatives to the present system. The study recommends retention of the present system with some limited modifications to enable the Commission to more effectively use its existing appellate powers

  2. NRC [Nuclear Regulatory Commission] staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    International Nuclear Information System (INIS)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved

  3. Licensing and regulatory control of nuclear power plants in Canada

    International Nuclear Information System (INIS)

    Atchison, R.J.

    1975-01-01

    The paper discusses the safety philosophy adopted in Canada, the safety criteria and regulatory requirements necessary for the application of this philosophy to reactor design and operation, and finally the means by which compliance with Board requirements is effected. It is emphasized that the effectiveness of regulatory control depends not only on the underlying philosophy but also on the detailed way in which it is applied. (orig./HP) [de

  4. Overview of the Nuclear Regulatory Commission's revised 10 CFR Part 20

    International Nuclear Information System (INIS)

    Peterson, H.T. Jr.

    1990-01-01

    The principal Nuclear Regulatory Commission (NRC) regulations covering radiation protection are in Part 20 of Title 10 of the Code of Federal Regulations (10 CFR Part 20). These regulations apply to almost all NRC licensed activities including nuclear power and research reactors, nuclear medicine, industrial radiography and the use of most radioactive isotopes in research. The revised 10 CFR Part 20 is based on the 1977 recommendations of the International Commission on Radiological Protection (ICRP) in ICRP Publication No. 26, implements the 1987 Federal Radiation Guidance on Occupational Exposure and is generally consistent with the 1987 recommendations of the U.S. National Council on Radiation Protection and Measurements (NCRP) in NCRP Report No. 91. There are a number of areas where the Revised Part 20 employs new and more up-to-date scientific information and concepts. One major change is in the use of revised lung and GI tract models and more recent metabolic retention data to calculate Annual Limits on Intake (ALI's) and Derived Air Concentration limits (DAC's). The Appendix B in the Revised Part 20 employs new and more up-to-date scientific information and concepts. One major change is in the use of revised lung and GI tract models and more recent metabolic retention data to calculate Annual Limits on Intake (ALI's) and Derived Air Concentration limits (DAC's). The Appendix B in the Revised Part 20 contains data on occupational ALI's and DCA's and radionuclide concentration limits for releases to the general environment for over 750 radionuclides. The final rule is expected to be published early in September with an implementation data of January 1, 1992

  5. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    International Nuclear Information System (INIS)

    Wilmot, Roger D.

    2011-02-01

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  6. Introduction of regulatory and licensing procedures of some OECD countries in the field of decommissioning

    International Nuclear Information System (INIS)

    Benedekfi, O.; Zagyvai, P.; Czifrus, S.; Ormai, P.; Danko, G.

    2001-01-01

    In the OECD countries more than 50 nuclear power plants will have to be closed in the beginning of the next century since their licenses expire. For this reason it is very important to establish reasonable regulations in the field of decommissioning. In this poster firstly we define the basic principles related to decommissioning. Then we account on our survey of the situation of the regulatory and licensing procedures in some OECD countries. Finally we compare the results. (authors)

  7. Regulatory licensing, status summary report; Systematic evaluation program

    International Nuclear Information System (INIS)

    1978-01-01

    This document is part of a management information system presenting a logical flow of events that represent the evaluation of 11 of the older operating nuclear reactors. Information collected will be used to determine the degree to which the 11 plants meet current licensing requirements and to develop an overall balanced position concerning any needed backfitting of the facilities and the documentation of the results of such evaluations

  8. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  9. Regulatory challenges for independent organization and licensing procedures for Egypt first nuclear power program

    International Nuclear Information System (INIS)

    Elsheikh, B.M.

    2012-01-01

    In March 2010 the Government of Egypt issued an Ordinance creating an independent regulatory body the Egypt Nuclear and Radiological Regulatory Authority (NRRA) reporting directly to the Prime Minister and responsible for matters dealing with protection of the radiation worker, public and environment from the harmful effects of ionizing radiation. A little more than 2 years have elapsed since this date. Some of the challenges faced by NRRA to its regulatory independence are given below. This paper will discuss the major challenges relating to Egyptian nuclear power program and specially the regulatory effectiveness and licensing procedures compared to international comparison.

  10. Nuclear Regulatory Commission low-level radioactive waste management program

    International Nuclear Information System (INIS)

    1977-09-01

    It is believed that the priorities of NRC work in low-level waste management as described in this action plan are consistent with the needs of the overall national waste management program. Present licensing procedures and criteria are adequate for the short term, and priority attention is being given to the longer term, when the quantities of waste to be managed will be greater and licensing demand will increase. The plan makes use of expertise within NRC to achieve early results and is coordinated with other Federal agencies having related responsibilities. Since NRC decisions will affect industry, other governmental jurisdictions, private interest groups, and the public at large, procedures were developed to involve them in planning the program

  11. Organization and practices on regulatory review in the licensing process of nuclear power plants in Spain

    International Nuclear Information System (INIS)

    Trueba, P.

    1979-01-01

    The actual organisation, practices and experience of the JEN Nuclear Safety Department on the regulatory review in the licensing process of nuclear power plants in Spain, are presented. Topics to be covered are: The structure, organisation, staff and principal functional areas of the NSD, the academic qualifications and work experience of the NSD personnel, recruiting and training, the conduct of the regulatory review during the licensing process and working procedures, the manpower and coverage of the different technical areas, the principal problems and conclusions. (author)

  12. Regulatory commitment management and the managing of licensing documents

    International Nuclear Information System (INIS)

    Roxey, T.E.

    1993-01-01

    The Regulatory Commitment Management (RCM) Project was designed to strengthen Baltimore Gas ampersand Electric's (BG ampersand E's) ability to identify, implement, and maintain regulatory commitments. The first part of this project involved the development of a clear commitment management process. The second part was the development of a tool that enhances the ability to retrieve information from documents, and the third part of the project dealt with the actual identification of historical commitments. This paper represents the first opportunity for BG ampersand E to discuss some of the success of the second part and the preliminary findings of the third part of the project

  13. US Nuclear Regulatory Commission organization charts and functional statements

    International Nuclear Information System (INIS)

    1996-01-01

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices

  14. US Nuclear Regulatory Commission organization charts and functional statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-19

    This document is the organizational chart for the US NRC. It contains organizational structure and functional statements for the following: (1) the Commission, (2) committees and boards, (3) staff offices, (4) office of the Inspector General, (5) executive director for operations, (6) program offices, and (7) regional offices.

  15. Indexes to Nuclear Regulatory Commission issuances, January--March 1994. Volume 39, Index 1

    International Nuclear Information System (INIS)

    1994-07-01

    Digests and indexes for issuances of the Commission, Atomic Safety and Licensing Board Panel, Administrative Law Judges, Directors' Decisions, and Denials of Petitions for Rulemaking are presented in this document. They are intended to serve as a guide to the issuances

  16. 78 FR 17604 - 2006 Biennial Regulatory Review-Revision of the Commission's Rules

    Science.gov (United States)

    2013-03-22

    ... March 22, 2013. FOR FURTHER INFORMATION CONTACT: William Bell, Satellite Division, International Bureau... amended various provisions of Part 25 of its rules pertaining to licensing and operation of satellite... Commission rules or recommendations of the International Telecommunication Union (ITU), and corrected...

  17. Selected review of regulatory standards and licensing issues for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.; Thomas, F.A.

    1982-11-01

    This report presents a compilation and description of current foreign regulatory standards and licensing issues in the areas of interest associated with Siting, Structural Engineering, Metallurgy and Materials, and Mechanical Engineering. In addition, summary comparisons of the requirements of both the US and foreign nuclear power plant regulatory standards are provided. The selected foreign countries surveyed include Canada, France, Japan, Sweden, United Kingdom of Great Britain and Northern Ireland, and the Federal Republic of Germany

  18. U.S. Nuclear Regulatory Commission, annual report, 1978

    International Nuclear Information System (INIS)

    1978-01-01

    The report contains the following chapters: (1) overview and summary, (2) reactor regulation, (3) materials regulation, (4) domestic safeguards, (5) waste management, (6) injection and enforcement, (7) operating experience, (8) state programs, (9) international activities, (10) standards development, (11) regulatory research, (12) informing and involving the public, (13) proceedings and litigation, and (14) administration and mangement

  19. Indexes to Nuclear Regulatory Commission issuances, July--December 1995

    International Nuclear Information System (INIS)

    1996-01-01

    Digests and indexes for issuances of the NRC, the Atomic Safety and Licensing Board, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: (1) case name, (2) full text reference, (3) issuance number, (4) issued raised by appellants, (5) legal citations, (6) name of facility and Docket number, (7) subject matter, (8) type of hearing, and (9) type of issuance

  20. A regulatory view of nuclear containment on UK licensed sites

    International Nuclear Information System (INIS)

    Bradford, P.M.; McNair, I.J.

    1997-01-01

    Members of the UK regulatory body, HM Nuclear Installations Inspectorate (NII) have previously presented conference papers and official reports which have dealt separately with either reactor applications or chemical plant applications. The objective of this paper is to draw together a brief overview of the role of containment in protecting against potential radiological and related hazards, and to describe the factors which influence the NII's assessment of containment safety cases. It draws upon the NII's experience of regulating many types of nuclear facility, from those designed in the late 1940s through to the modern plants, such as Sizewell 'B' and THORP. The paper reviews the legislative and regulatory background within which the facilities exist and are operated. Finally, the paper reviews recent, ongoing and planned research in the field of containment, which has been designed to behave under challenge. (author)

  1. Overview of the Nuclear Regulatory Commission's safety research program

    International Nuclear Information System (INIS)

    Beckjord, E.S.

    1989-01-01

    Accomplishments during 1988 of the Office of Nuclear Regulatory Research and the program of safety research are highlighted, and plans, expections, and needs of the next year and beyond are discussed. Topics discussed include: ECCS Appendix K Revision; pressurized thermal shock; NUREG-1150, or the PRA method performance document; resolution of station blackout; severe accident integration plan; nuclear safety research review committee; and program management

  2. Regulatory challenges for the licensing of future nuclear plants: A public interest perspective

    International Nuclear Information System (INIS)

    Lyman, Edwin S.

    2001-01-01

    Regulatory challenges concerned with licensing of advanced NPPs must ensure that economic imperatives do not have adverse impacts on safety, risk of radiological sabotage, waste management and disposal, non-proliferation, full opportunity for public participation. This presentation explains the mentioned issues using pebble bed reactor as an example

  3. An overview of the licensing approach of the South African nuclear regulatory authority

    International Nuclear Information System (INIS)

    Clapisson, G.A.; Hill, T.F.; Henderson, N.R.; Keenan, N.H.; Metcalf, P.E.; Mysenkov, A.

    1997-01-01

    This paper describes the approach adopted by the South African Nuclear Regulatory Authority, the Council for Nuclear Safety (CNS) in licensing nuclear installations in South Africa. An introduction to the current South African legislation and the CNS philosophy pertaining to the licensing of nuclear installations is discussed. A typical process for granting a nuclear licence is then presented. The risk assessment process, which is used to verify compliance with the fundamental safety standards and to establish licensing requirements for a specific nuclear installation, is discussed. Based on the outcome of this assessment process, conditions of licence are set down. The generic content of a nuclear licence and mechanisms to ensure ongoing compliance with the risk criteria are presented. The regulatory process discussed in this paper, based on such a fundamental approach, may be adapted to any type of nuclear installation taking into account plant specific designs and characteristics. (author)

  4. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    International Nuclear Information System (INIS)

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities

  5. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    Energy Technology Data Exchange (ETDEWEB)

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.; Peterson, S.R.; Gee, G.W.; Serne, R.J.; Hartley, J.N.; Thomas, V.W.; Kalkwarf, D.R.; Walters, W.H.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities.

  6. NRC [Nuclear Regulatory Commission] safety research in support of regulation, 1987

    International Nuclear Information System (INIS)

    1988-05-01

    This report, the third in a series of annual reports, was prepared in response to congressional inquiries concerning how nuclear regulatory research is used. It summarizes the accomplishments of the Office of Nuclear Regulatory Research during 1987. The goal of this office is to ensure that research provides the technical bases for rulemaking and for related decisions in support of NRC licensing and inspection activities. This report describes both the direct contributions to scientific and technical knowledge with regard to nuclear safety and their regulatory applications

  7. 76 FR 59173 - Standard Format and Content of License Applications for Conventional Uranium Mills

    Science.gov (United States)

    2011-09-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2008-0302] Standard Format and Content of License Applications for Conventional Uranium Mills AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide..., ``Standard Format and Content of License Applications for Conventional Uranium Mills.'' DG- 3024 was a...

  8. Humeca Uranium Mill. Nuclear Regulatory Commission's final environmental statement

    International Nuclear Information System (INIS)

    1976-04-01

    The Humeca Uranium Mill is a carbonate-leach uranium ore refining plant with a capacity of about 500 tons of ore per day. Although the present licensing action does not extend to mining, the statement considers the environmental impact of the combined mining and milling project to be conducted by Rio Algom Corporation. The environmental impact, including adverse and beneficial environmental effects of the Rio Algom Uranium Mill, is as follows. (1) Temporary (about 10 years) reassignment of use of about 120 acres of land out of the total 2,573 acres controlled by Rio Algom Corporation. (2) The removal of an estimated 8.4 million pounds of uranium concentrates as a natural resource. This material will eventually be used to produce approximately 6.09 x 10 6 megawatt-days of electricity. (3) Removal and diversion of approximately 100 gallons per minute of local groundwater. (4) Stimulation of the local economy through payment of taxes and direct employment of about 200 persons in San Juan County over the next 10 years. Rio Algom estimates they will pay out over $11 million in salaries over this period of time. (5) The creation of stabilized tailings piles covering about 45 acres involving approximately 1,850,000 tons of solids containing solidified waste chemical and radioactive uranium and its daughter products. (6) Discharge of small quantities of chemicals and radioactive materials (that are not expected to produce discernible effects) into the local environs

  9. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Digest No. 2

    International Nuclear Information System (INIS)

    1978-08-01

    This second edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to March 31, 1978 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This second edition replaces the first edition and its supplements and includes appropriate changes reflecting the recent amendments to the Rules of Practice which became effective on May 26, 1978

  10. U.S. Nuclear Regulatory Commission bases for control of solid materials

    International Nuclear Information System (INIS)

    Meck, R.A.; Cardille, F.P.; Feldman, C.; Gnugnoli, G.N.; Huffert, A.M.; Klementowicz, S.P.

    2002-01-01

    The U.S. Nuclear Regulatory Commission (NRC) is considering whether to proceed with rulemaking on the control of solid materials with very low levels of associated radioactivity. The current implementation of clearance by NRC licensees is the context for the decision. Inputs to the decision include information gathering efforts of the Commission in the areas of public workshops, dose assessments and inventories, the recommendations of the National Academies' National Research Council (NAs) on regulatory alternatives, and participation in international efforts by the International Atomic Energy Agency (IAEA). (author)

  11. 78 FR 37324 - Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications

    Science.gov (United States)

    2013-06-20

    ... Environmental Reports for Nuclear Power Plant License Renewal Applications AGENCY: Nuclear Regulatory Commission... for Nuclear Power Plant License Renewal Applications.'' This regulatory guide provides guidance to... renewal of a nuclear power plant operating license. Applicants should use this regulatory guide when...

  12. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

  13. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    International Nuclear Information System (INIS)

    1996-01-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition

  14. 10 CFR 34.13 - Specific license for industrial radiography.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Specific license for industrial radiography. 34.13 Section 34.13 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY... industrial radiography. An application for a specific license for the use of licensed material in industrial...

  15. H.R. 4895: a bill to establish a requirement that no person may offer any high-level radioactive waste for transportation in interstate commerce unless licensed for such offering by the Nuclear Regulatory Commission, and for other purposes. Introduced in the House of Representatives, Ninety-Ninth Congress, Second Session, May 22, 1986

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The Nuclear Waste Transportation Act requires that anyone offering high-level radioactive waste for transportation in interstate commerce must be licensed. The bill describes the qualifications and requirements for obtaining a license either to offer the wastes or to transport it, the procedures for issuance, notification to political subdivisions and Indian tribes, and routing. It also includes time restrictions and enforcement authority. High-level radioactive materials include spent nuclear fuel and reprocessing materials

  16. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, Roger D. (Galson Sciences Limited (United Kingdom))

    2011-02-15

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  17. Recommended revisions to nuclear regulatory commission seismic design criteria

    International Nuclear Information System (INIS)

    Coats, D.W.

    1981-01-01

    Task Action Plan (TAP) A-40 was developed by consolidating specific technical assistance studies initiated to identify and quantify the conservatism inherent in the seismic design sequence of current NRC criteria. Task 10 of TAP A-40 provided a technical review of the results of the other nine engineering and seismological tasks in TAP A-40 and recommended changes to the existing NRC criteria based on this review. We used the team approach to accomplish the objectives of Task 10 in an efficient manner and to provide the best technical product possible within the limited time available. The team consisted of a core group of Lawrence Livermore National Laboratory personnel and selected consultants. The recommendations summarized in this paper were not based solely on the results of the tasks in TAP A-40 but went far beyond that data base to encompass all available and appropriate literature. Some recommendations are based on the expertise of core members and consultants that stem from unpublished data, research, and experience. Copies of the pertinent sections of the Standard Review Plan (SRP) and Regulatory Guides as well as the reports developed under TAP A-40 were provided to the participants. These reports, other available engineering literature, and the experience of the consultants and core group provided technical basis for the recommendations. (orig./HP)

  18. International assistance. Licensing assistance project

    International Nuclear Information System (INIS)

    Aleev, A.

    1999-01-01

    Description of licensing assistance project for VATESI is presented. In licensing of unit No.1 of INPP VATESI is supported by many western countries. Experts from regulatory bodies or scientific organizations of those countries assist VATESI staff in reviewing documentation presented by INPP. Among bilateral cooperation support is provided by European Commission through Phare programme

  19. Indexes to Nuclear Regulatory Commission issuances, January--June 1995. Volume 41, Index 2

    International Nuclear Information System (INIS)

    1995-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the directors' Decisions (DD), and the Denials of Petitions for rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index

  20. Indexes to Nuclear Regulatory Commission Issuances, July--December 1993. Volume 38, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Headers; Legal Citations Index; Subject Index, and Facility Index.

  1. Indexes to Nuclear Regulatory Commission issuances, January--June 1995. Volume 41, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the directors` Decisions (DD), and the Denials of Petitions for rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. The information elements are displayed in one or more of five separate formats arranged as follows: Case name index; digests and headers; legal citations index; subject index; and facility index.

  2. Indexes to Nuclear Regulatory Commission issuances, July--December 1996. Volume 44, Index 2

    International Nuclear Information System (INIS)

    1997-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by apellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (operating license, operating license amendment, etc.); type of issuance (memorandum, order, decision, etc.)

  3. Indexes to Nuclear Regulatory Commission issuances, January 19, 1975 through December 31, 1979

    International Nuclear Information System (INIS)

    1981-03-01

    The document contains indexes for adjudicatory decisions of the Commission (CLI), the Atomic Safety and Licensing Appeal Board (ALAB), the Atomic Safety and Licensing Board (LBP), the Administrative Law Judge (ALJ), the Directors Denials (DD), and the Denials of Petitions for Rulemaking (DPRM). The Directors Denials and Denials of Petition for Rulemaking are new categories, added in 1979. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); Name of facility, Docket number; Type of hearing (for construction permit, operating license, etc.); Issues raised by appellants; Issuance number; Type of issuance (memorandum, order, decision, etc.); Issuance pagination; Legal citations (cases, regulations, and statutes); and Subject matter of issues and/or rulings. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; Digests and headers; Legal citation index; Subject index; and Facility index

  4. Indexes to Nuclear Regulatory Commission issuances, July--December 1996. Volume 44, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by apellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (operating license, operating license amendment, etc.); type of issuance (memorandum, order, decision, etc.).

  5. Indexes to Nuclear Regulatory Commission issuances, January-June 1983. Volume 17, Index 2

    International Nuclear Information System (INIS)

    1983-10-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, Docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  6. Nuclear Regulatory Commission's antitrust review process: an analysis of the impacts

    International Nuclear Information System (INIS)

    1981-06-01

    The Nuclear Regulatory Commission's (NRC) antitrust process is reviewed and its impacts to small systems and applicant systems are studied. This process takes the form of a description of the NRC's antitrust review process as implemented, a generic categorization of potential impacts and individual case-by-case studies of four different utilities

  7. The U.S. Nuclear Regulatory Commission's role in the management of radioactive wastes

    International Nuclear Information System (INIS)

    Bernero, R.M.; Kalman, K.L.

    1991-01-01

    This paper discusses the U.S. Nuclear Regulatory Commission's (NRC's) role in the management of radioactive waste. It provides an overview of the NRC's programs for the management of High-Level and Low-Level radioctive wastes and uranium mill tailings. (author) 7 refs

  8. Reactors licensing: proposal of an integrated quality and environment regulatory structure for nuclear research reactors in Brazil; Licenciamento de reatores: proposta de uma estrutura regulatoria integrada com abordagem em qualidade e meio ambiente para reatores de pesquisa no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Serra, Reynaldo Cavalcanti

    2014-07-01

    A new integrated regulatory structure based on quality and integrated issues has been proposed to be implemented on the licensing process of nuclear research reactors in Brazil. The study starts with a literature review about the licensing process in several countries, all of them members of the International Atomic Energy Agency. After this phase it is performed a comparative study with the Brazilian licensing process to identify good practices (positive aspects), the gaps on it and to propose an approach of an integrated quality and environmental management system, in order to contribute with a new licensing process scheme in Brazil. The literature review considered the following research nuclear reactors: Jules-Horowitz and OSIRIS (France), Hanaro (Korea), Maples 1 and 2 (Canada), OPAL (Australia), Pallas (Holand), ETRR-2 (Egypt) and IEA-R1 (Brazil). The current nuclear research reactors licensing process in Brazil is conducted by two regulatory bodies: the Brazilian National Nuclear Energy Commission (CNEN) and the Brazilian Institute of Environment and Renewable Natural Resources (IBAMA). CNEN is responsible by nuclear issues, while IBAMA by environmental one. To support the study it was applied a questionnaire and interviews based on the current regulatory structure to four nuclear research reactors in Brazil. Nowadays, the nuclear research reactor’s licensing process, in Brazil, has six phases and the environmental licensing process has three phases. A correlation study among these phases leads to a proposal of a new quality and environmental integrated licensing structure with four harmonized phases, hence reducing potential delays in this process. (author)

  9. The Energy Regulatory Commission (1). Law of the Comision Reguladora de Energia

    International Nuclear Information System (INIS)

    1995-01-01

    The Energy Regulatory Commission. Reforms to the Electric Energy Public Service Law (1992) and the Regulatory Law of Article 27 on Petroleum (1995) have brought about fundamental changes in the electric and natural gas industries. The legal reforms explicitly permit the private sector to construct, operate, and own, systems of electric generation and natural gas transportation, storage and distribution. The participation of the private sector in these areas required a redefinition in the government regulatory institutions. Accordingly the Federal Congress enacted the law of the Comision Reguladora de Energia (CRE) in 1995. The CRE law expands the scope of the CRE's authority and the breadth of its powers beyond those established when it was initially created in 1993. The CRE commenced operations in January 1994 as a decentralized technical and consultative body of the Energy Ministry. The decree that created the Commission limited the scope of its authority to an analysis and consultative role applicable only to the electric industry. (Author)

  10. 75 FR 52046 - Development of U.S. Nuclear Regulatory Commission Safety Culture Policy Statement: Public Meeting

    Science.gov (United States)

    2010-08-24

    ... is working towards increasing the attention that is given to safety culture as part of its efforts to... NUCLEAR REGULATORY COMMISSION Development of U.S. Nuclear Regulatory Commission Safety Culture..., Nevada hearing facility to solicit comments on the revision of its draft safety culture policy statement...

  11. Ratemaking treatment of decommissioning costs by the Federal Energy Regulatory Commission

    International Nuclear Information System (INIS)

    Lenart, R.J.

    1985-01-01

    The Nuclear Regulatory Commission (NRC) has the responsibility for the assurance of funds at the time of decommissioning. The Federal Energy Regulatory Commission (FERC), in conjunction with the State Public Utility Commissions, have the responsibilty to ensure that utilities have just and reasonable rates and an opportunity to collect an appropriate amount of dollars to decommission a nuclear reactor at the conclusion of its service life. Therefore, the Federal Energy Regulatory Commission allows utilities to include nuclear power plant decommissioning costs in rates based on the following ratemaking concepts: (1) that the methodology used by a utility equitably allocates costs between present and future ratepayers who receive service from a nuclear unit; (2) that, given the uncertainty and imprecision that are included in cost estimates for events that will transpire 20-40 years in the future, the FERC chose to err on the low side rather than run the risk of overcharging current customers for future decommissioning expense; and (3) that, as decommissioning experience accumulates, as decommissioning technology improves, and as decommissioning estimates become more refined, utilities would continue to seek revised decommissioning expense allowances from FERC in order to ensure that actual decommissioning costs are recovered over the useful life in which the plant provides service

  12. Licensing evaluation of CANDU-PHW nuclear power plants relative to U.S. regulatory requirements

    International Nuclear Information System (INIS)

    Erp, J.B. van

    1978-01-01

    Differences between the U.S. and Canadian approach to safety and licensing are discussed. U.S. regulatory requirements are evaluated as regards their applicability to CANDU-PHW reactors; vice-versa the CANDU-PHW reactor is evaluated with respect to current Regulatory Requirements and Guides. A number of design modifications are proposed to be incorporated into the CANDU-PHW reactor in order to facilitate its introduction into the U.S. These modifications are proposed solely for the purpose of maintaining consistency within the current U.S. regulatory system and not out of a need to improve the safety of current-design CANDU-PHW nuclear power plants. A number of issues are identified which still require resolution. Most of these issues are concerned with design areas not (yet) covered by the ASME code. (author)

  13. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  14. Status report on the Nuclear Regulatory Commission regulations for land disposal of low-level radioactive wastes and geologic repository disposal of high-level wastes

    International Nuclear Information System (INIS)

    Browning, R.E.; Bell, M.J.; Dragonette, K.S.; Johnson, T.C.; Roles, G.W.; Lohaus, P.H.; Regnier, E.P.

    1984-01-01

    On 27 December 1982, the United States Nuclear Regulatory Commission (NRC) amended its regulations to provide specific requirements for licensing the land disposal of low-level radioactive wastes. The regulations establish performance objectives for land disposal of waste; technical requirements for the siting, design, operations, and closure activities for a near-surface disposal facility; technical requirements concerning waste form and classification that waste generators must meet for the land disposal of waste; institutional requirements; financial assurance requirements; and administrative and procedural requirements for licensing a disposal facility. Waste generators must comply with the waste form and classification provisions of the new rule, on 27 December 1983, one year later. During this implementation period, licensees must develop programmes to ensure compliance with the new waste form and classification provisions. The NRC is also promulgating regulations specifying the technical criteria for disposal of high-level radioactive wastes in geological repositories. The proposed rule was published for public comment in July 1981. Public comments have been received and considered by the Commission staff. The Commission will soon approve and publish a revised final rule. While the final rule being considered by the Commission is fundamentally the same as the proposed rule, provisions have been added to permit flexibility in the application of numerical criteria, some detailed design requirements have been deleted, and other changes have been made in response to comments. The rule is consistent with the recently enacted Nuclear Waste Policy Act of 1982. (author)

  15. Regulatory Approach To and Lessons Learned with Licensing of Service Life Extension at PAKS NPP

    International Nuclear Information System (INIS)

    Petofi, G.

    2012-01-01

    Paks Nuclear Power Plant of Hungary decided to extend the original design lifetime of the plant by 20 years, which expires on December 31, 2012 concerning unit 1. The Hungarian Atomic Energy Authority established the legal environments in order to license the extension using an approach similar to that followed in the United States. The regulation specifies the pre-conditions for the extension, defines the scoping and screening process for the passive and long lived systems, structures and components to be involved in the licensing and the respective methods of treatment and also determines how the active components shall be dealt with during the extended lifetime. The regulatory procedure is a two-step process including the oversight of the preparatory programme of the operator for the extension that started 4 years before the expiry of the lifetime and the licensing process itself, which is currently under way for unit 1 after the submittal of the licensee's application at the end of 2011. The first experiences with the regulatory assessment of the application are available yet and presented in this paper. (author)

  16. Indexes to Nuclear Regulatory Commission issuances, July--September 1995. Volume 42, Index 1

    International Nuclear Information System (INIS)

    1995-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  17. Indexes to Nuclear Regulatory Commission issuances, July--December 1994. Volume 40, Index 2

    International Nuclear Information System (INIS)

    1994-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board panel (LBP), the Administrative Law Judges, the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.)

  18. Indexes to Nuclear Regulatory Commission issuances: July--September 1994. Volume 40, Index 1

    International Nuclear Information System (INIS)

    1994-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility), full text reference (volume and pagination), issuance number, issues raised by apellants, legal citations (cases, regulations, and statutes), name of facility, docket number, subject matter of issues and/or rulings, type of hearing (for construction permit, operating license, etc.), type of issuance (Memorandum, order, decision, etc.)

  19. Indexes to Nuclear Regulatory Commission issuances, January--March 1995. Volume 41, Index 1

    International Nuclear Information System (INIS)

    1995-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  20. Indexes to Nuclear Regulatory Commission issuances, July--December 1994. Volume 40, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board panel (LBP), the Administrative Law Judges, the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.).

  1. Indexes to Nuclear Regulatory Commission issuances: July--September 1994. Volume 40, Index 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decision (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility), full text reference (volume and pagination), issuance number, issues raised by apellants, legal citations (cases, regulations, and statutes), name of facility, docket number, subject matter of issues and/or rulings, type of hearing (for construction permit, operating license, etc.), type of issuance (Memorandum, order, decision, etc.).

  2. Specific problems and practical experience of regulatory inspection during commissioning in the United Kingdom

    International Nuclear Information System (INIS)

    Lewis, G.

    1977-01-01

    The commissioning of nine Magnox and two Advanced Gas-cooled Reactor Nuclear Power Plants in the United Kingdom during the last sixteen years under the regulatory control of the Nuclear Installations Inspectorate of the Health and Safety Executive has been based on a Stage Approval Philosophy starting with proof-testing of the primary gas circuit and concluding with tests on the reactor at full power. The practical experience gained during this period has enabled the Nuclear Installations Inspectorate to rationalise the procedures and test requirements without comporomising safety standards. The Operating Rules and Maintenance Schedules are approved for commissioning and during this period are reviewed for their adequacy for future power operation of the plant. The organisation, documentation, test procedures and the commissioning programme used for the Advanced Gas-cooled Reactors are briefly explained. (author)

  3. Transforming public utility commissions in the new regulatory environment: Some issues and ideas for managing change

    Energy Technology Data Exchange (ETDEWEB)

    Wirick, D.W.; Davis, V.W.; Burns, R.E.; Jones, D.N.

    1996-07-01

    In the face of sweeping changes in utility markets and regulatory practices, public utility commissions are being forced to change in fundamental ways--to substantially transform themselves rather than to make only incremental changes in their operations. Managing this process of radical change is complicated by the fact that for the foreseeable future some portions of utility markets (e.g., water utilities) will function much as they have before. Some envision commissions in the future that are more externally focussed, that rely more on dispute resolution than adjudicatory proceedings, that concentrate on identifying and understanding competitive markets, that are more automated, and that are more likely to question old assumptions and definitions. This report identifies the considerations commissions might apply for identifying what mix of skills or fields of experise should compromise the technical staff. Factors are also identified which point towards a sectoral arrangement of staff and those factors which point toward a functional approach.

  4. 76 FR 18261 - University of Wisconsin; Notice of Issuance of Renewed Facility License No. R-74

    Science.gov (United States)

    2011-04-01

    ... of Issuance of Renewed Facility License No. R-74 The U.S. Nuclear Regulatory Commission (NRC, the Commission) has issued renewed Facility License No. R-74, held by the University of Wisconsin (the licensee... to 1.4% [Delta]k/k. The renewed Facility License No. R-74 will expire at midnight 20 years from its...

  5. Review process for license renewal applications

    International Nuclear Information System (INIS)

    Craig, John W.; Kuo, P.T.

    1991-01-01

    In preparation for license renewal reviews, the Nuclear Regulatory Commission has recently published for public review and comment a proposed rule for license renewal and a draft Standard Review Plan as well as a draft Regulatory Guide relating to the implementation of the proposed rule. In support of future license renewal applications, the nuclear industry has also submitted 11 industry reports for NRC review and approval. This paper briefly describe how these parallel regulatory and industry activities will be factored into the NRC review process for license renewal. (author)

  6. Nuclear Regulatory Commission probabilistic risk assessment implementation program: A status report

    International Nuclear Information System (INIS)

    Rubin, M.P.; Caruso, M.A.

    1996-01-01

    The US Nuclear Regulatory Commission (NRC) is undertaking a number of activities intended to increase the consideration of risk significance in its decision processes and the effective use of risk-based technologies in its regulatory activities. Although the NRC is moving toward risk-informed regulation throughout its areas of responsibilities, this paper focuses primarily on those issues associated with reactor regulation. As the NRC completed significant milestones in its development of probabilistic risk assessment (PRA) methodology and gained considerable experience in the limited application of risk assessment to selected regulatory activities, it became evident that a much broader use of risk informed approaches offered advantages to both the NRC and the US commercial nuclear industry. This desire to enhance the use of risk assessment is driven by the clear belief that application of PRA methods will result in direct improvements in nuclear power plant operational safety from the perspective of both the regulator and the plant operator. The NRC believed that an overall policy on the use of PRA methods in nuclear regulatory activities should be established so that the many potential applications of PRA could be implemented in a consistent and predictable manner that would promote regulatory stability and efficiency. This paper describes the key activities that the NRC has undertaken to implement the initial stages of an integrated risk-informed regulatory framework

  7. U.S. Nuclear Regulatory Commission Process for Risk-Informing the Nuclear Waste Arena

    International Nuclear Information System (INIS)

    Leslie, B. W.

    2003-01-01

    The U.S. Nuclear Regulatory Commission (NRC) is increasing the use of risk insights and information in its regulation of nuclear materials and waste. The objective of this risk-informed regulatory effort is to improve the effectiveness and efficiency of the agency, while maintaining or increasing its focus on safety. The agency's Office of Nuclear Material Safety and Safeguards (NMSS) proposed a five-step process to carry out a framework for increasing the use of risk information and insights in its regulation of nuclear materials and waste. The office is carrying out the five-step process to risk-inform the nuclear materials and waste arenas. NMSS's actions included forming a Risk Task Group and the use of case studies to test and complete screening criteria for identifying candidate regulatory applications amenable for risk-informing. Other actions included involving stakeholders through enhanced public participation, developing safety goals for materials and waste regulatory applications, and establishing a risk training program for staff. Through the case studies, NRC staff found the draft screening criteria to be effective in deciding regulatory areas that may be amenable to an increased use of risk insights. NRC staff also found that risk information may have the potential to reduce regulatory burden and improve staff's efficiency in making decisions, while maintaining safety. Finally, staff found that it would be possible to develop safety goals for the nuclear materials and waste arenas

  8. Access to the decision-making process: opportunities for public involvement in the facility decommissioning process of the United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Cameron, F.X.

    1996-01-01

    This paper discusses recent initiatives taken by the United States Nuclear Regulatory Commission NRC) to effectively involve the public in decommissioning decisions. Initiatives discussed include the Commission's rulemaking to establish the radiological criteria for decommissioning, as well as public involvement methods that have been used on a site-by-site basis. As un example of public involvement, the NRC is currently in the process of developing generic rules on the radiological criteria for the decontamination and decommissioning of NRC-licensed sites. Not only was this proposed rule developed through an extensive and novel approach for public involvement, but it also establishes the basic provisions that will govern public involvement in future NRC decisions on the decommissioning of individual sites. The aim is to provide the public with timely information about all phases of the NRC staff to express concerns and make recommendations. Th NRC recognizes the value and the necessity of effective public involvement in its regulatory activities and has initiated a number of changes to its regulatory program to accomplish this. From the NRC's perspective, it is much easier and less costly to incorporate these mechanisms for public involvement into the regulatory program early in the process, rather than try to add them after considerable public controversy on an action has already been generated. The historical antecedents for initiatives mentioned, as well as 'lessons learned' from prior experience are also discussed. (author)

  9. 77 FR 76483 - Ocean Transportation Intermediary License Applicants The Commission gives notice that the...

    Science.gov (United States)

    2012-12-28

    ... Transport Co., PAC International Logistics Company, & Book Express Network. Stealth Logistics LLC (NVO & OFF.... Application Type: QI Change. Efrinsa Global Logistics Inc. (NVO & OFF), 8441 NW 68th Street, Miami, FL 33166... (QI), Sheila E. Lawrence, President. Application Type: New OFF License. MMC Logistics, LLC (OFF), 2853...

  10. 76 FR 65544 - Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities

    Science.gov (United States)

    2011-10-21

    ... NUCLEAR REGULATORY COMMISSION [NRC-2009-0323] Standard Format and Content of License Applications... revision to regulatory guide (RG) 3.39, ``Standard Format and Content of License Applications for Mixed Oxide Fuel Fabrication Facilities.'' This guide endorses the standard format and content for license...

  11. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, J D

    1976-04-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria.

  12. Survey of extreme load design regulatory agency licensing requirements for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1976-01-01

    Since 1965, when extreme load requirements began to be considered explicitly in nuclear power plant design, there has been a gradual divergence in requirements imposed by national regulatory agencies. However, nuclear plant safety is an international problem because of the potential international effects of any postulated plant failure. For this reason this paper has been prepared in an attempt to highlight the differences in national criteria currently used in the extreme load design of nuclear plant facilities. No attempt has been made to evaluate the relative merit of the criteria established by the various national regulatory agencies. This paper presents the results of a recent survey made of national atomic energy regulatory agencies and major nuclear steam supply design agencies, which requested a summary of current licensing criteria associated with earthquake, extreme wind (tornado), flood, airplane crash and accident (pipe break) loads applicable within the various national jurisdictions. Also presented are a number of comparisons which are meant to illustrate the differences in national regulatory criteria. (Auth.)

  13. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Science.gov (United States)

    2010-01-01

    ... PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory Commission..., Louisiana, Montana, Nebraska, Nevada, New Mexico, North Dakota, Oklahoma, Oregon, South Dakota, Texas, Utah...

  14. 10 CFR 71.5 - Transportation of licensed material.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Transportation of licensed material. 71.5 Section 71.5 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) PACKAGING AND TRANSPORTATION OF RADIOACTIVE MATERIAL General Provisions § 71.5 Transportation of licensed material. (a) Each licensee who transports licensed...

  15. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  16. 78 FR 29393 - University of Missouri-Columbia Facility Operating License No. R-103

    Science.gov (United States)

    2013-05-20

    ... Facility Operating License No. R-103 AGENCY: Nuclear Regulatory Commission. ACTION: License renewal... the renewal of Facility Operating License No. R-103 (``Application''), which currently authorizes the... application for the renewal of Facility Operating License No. R-103, which, currently authorizes the licensee...

  17. 78 FR 5840 - Notice of License Termination for University of Illinois Advanced TRIGA Reactor, License No. R-115

    Science.gov (United States)

    2013-01-28

    ... University of Illinois Advanced TRIGA Reactor, License No. R-115 The U.S. Nuclear Regulatory Commission (NRC) is noticing the termination of Facility Operating License No. R-115, for the University of Illinois... Operating License No. R-115 is terminated. The above referenced documents may be examined, and/or copied for...

  18. H.R. 3532: This act may be cited as the Nuclear Regulatory Commission Authorization Act for Fiscal Year 1999. Introduced in the House of Representatives, One Hundred Fifth Congress, Second Session, March 24, 1998

    International Nuclear Information System (INIS)

    1998-01-01

    This bill authorizes appropriations for the Nuclear Regulatory Commission for fiscal year 1999. It is divided into the following sections: Section 1. Short title; Section 102. Allocation of amounts authorized; Section 103. Retention of funds; Section 104. Transfer of certain funds; Section 105. Limitation; Section 106. License fee exemption; Section 107. NRC user fees and actual charges. Section 201. Office location; Section 202. Period of a combined license; Section 203. Gift acceptance authority; Section 204. Carrying of firearms by licensee employees; Section 205. Sabotage of production, utilization or waste storage facilities under construction; Section 206. Unauthorized introduction of dangerous weapons; and Section 207. Continuation of Commissioner service

  19. The regulatory review of construction license application and the supporting safety case

    International Nuclear Information System (INIS)

    Heinonen, Jussi

    2014-01-01

    Finland is one of the foremost countries in the world in developing the disposal of spent fuel. The construction license application for the Olkiluoto spent fuel disposal facility was submitted to the authorities at the end of 2012 and the facility is expected to start operation around 2020. This has been a long-term project with over 30 years of parallel development of the repository project and the regulatory approach to spent fuel management. In 1983 the government made a strategic decision on the objectives and target time schedule for the research, development and technical planning of nuclear waste management. While an export and international disposal solution was still the preferred option, this decision required the licensees without this possibility to prepare for disposal in Finland and it also gave the time line for the milestones on the way to an operating disposal facility by 2020. The licensing procedure for a disposal facility has several steps that are similar to all nuclear facilities in Finland and are defined in Nuclear Energy Act and Decree (1987, 1988). These licensing steps are: - Decision-in-principle is required for a nuclear facility having considerable general significance. This is essentially a political decision: the government decides if the construction project is in line with the overall good of society. The decision can be applied for one or more sites, the host municipality has a veto right and the parliament has the choice of ratifying or not ratifying the decision. - Construction license is granted by the government and authorises the construction of the disposal facility. The actual construction is regulated by STUK and includes several review and approval steps, hold points and viewpoints. - Operational license is granted by the government and authorises the operation of the facility for a certain period. The operational license is needed before nuclear waste can be disposed. The first step in the licensing process was reached

  20. Recommended revisions to Nuclear Regulatory Commission seismic design criteria. Technical report

    International Nuclear Information System (INIS)

    Coats, D.W.

    1980-05-01

    This report recommends changes in the Nuclear Regulatory Commission's (NRC's) criteria now used in the seismic design of nuclear power plants. Areas covered include ground motion, soil-structure interaction, structures, and equipment and components. Members of the Engineering Mechanics Section of the Nuclear Test Engineering Division at Lawrence Livermore Laboratory (LLL) generally agreed upon the recommendations, which are based on (1) reports developed under the NRC's Task Action Plan A-40, (2) other available engineering literature, and (3) recommendations of nationally recognized experts retained by LLL specifically for this task

  1. Technical support to the Nuclear Regulatory Commission for the boiling water reactor blowdown heat transfer program

    International Nuclear Information System (INIS)

    Rice, R.E.

    1976-09-01

    Results are presented of studies conducted by Aerojet Nuclear Company (ANC) in FY 1975 to support the Nuclear Regulatory Commission (NRC) on the boiling water reactor blowdown heat transfer (BWR-BDHT) program. The support provided by ANC is that of an independent assessor of the program to ensure that the data obtained are adequate for verification of analytical models used for predicting reactor response to a postulated loss-of-coolant accident. The support included reviews of program plans, objectives, measurements, and actual data. Additional activity included analysis of experimental system performance and evaluation of the RELAP4 computer code as applied to the experiments

  2. The U.S. Nuclear Regulatory Commission seismic safety research program

    International Nuclear Information System (INIS)

    Kenneally, R.M.; Guzy, D.J.; Murphy, A.J.

    1988-01-01

    The seismic safety research program sponsored by the U.S. Nuclear Regulatory Commission is directed toward improving the evaluation of potential earthquake effects on nuclear power plant operations. The research has been divided into three major program areas: earth sciences, seismic design margins, and fragilities and response. A major thrust of this research is to assess plant behavior for seismic events more severe and less probable than those considered in design. However, there is also research aimed at improving the evaluation of earthquake input and plant response at plant design levels

  3. The enforcement program of the nuclear regulatory commission in the United States

    International Nuclear Information System (INIS)

    Thornburg, H.D.

    1977-01-01

    The enforcement program of the United States Nuclear Regulatory Commission consists of a clearly spelled out, evenly applied program of deterrents which escalate according to the nature of the offense and the past history of the licensee's noncompliances. Ninety-eight percent of all enforcement actions are normally handled by the five Regional offices. Only one percent of noncompliances have been classed as violations where significant safety consequences occurred. A strong and timely enforcement program is essential to insure that licensees fulfill their obligations to protect the public and the environment. (Auth.) [fr

  4. Reactor safety: a discussion by officials of the Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Anders, W.A.; Rusche, B.C.; Stello, V. Jr.; Minogue, R.B.

    1976-01-01

    William A. Anders, Chairman of the Nuclear Regulatory Commission (NRC), and several senior officials spoke to the Joint Committee on Atomic Energy on the subject of nuclear safety, improvements in reactor plant safety, and quality assurance. The NRC, during its first year of organization, has developed new initiatives to improve safety and safeguards regulations. Anders stressed that NRC is not stifling internal discussion of opposing views, that it has been honest with the public, and that operating reactors are meeting rigorous safety standards. Other speakers discussed comparative safety of old and new reactors. Backfitting of older plants with new features is done when substantial safety protection can be added, but detuning an integrated system is not done indiscriminately. Officials of NRC do not agree with former General Electric employees, who testified that the regulatory procedure is inadequate. Safety improvements since August 28, 1962 and outlines of the review process are included in the Appendixes

  5. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  6. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    International Nuclear Information System (INIS)

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination

  7. H.R. 5448: a bill to amend the Atomic Energy Act of 1954, as amended, to reorganize the functions of the Nuclear Regulatory Commission by abolishing the Commission and in its place establishing the Nuclear Regulation and Safety Agency. Introduced in the House of Representatives, Ninety-Ninth Congress, Second Session, August 15, 1986

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The Omnibus Nuclear Safety Act of 1986 amends the Atomic Energy Act of 1954 by replacing the Nuclear Regulatory Commission with a new entity, the Nuclear Regulation and Safety Agency. The purposes are to promote an energy policy that is better coordinated and more consistent with the protection of public health and safety. The new agency would also expedite licensing for construction and operation of nuclear power plants by using pre-approved standardized designs and sites

  8. Preliminary Study on the Establishment of Regulatory Infrastructure for a Commercial SMART Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Yune, Young Gill; Roh, Kyung Wan; Kang, Dong Gu; Kim, Hho Jung; Jo, Jong Chull [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2007-10-15

    The SMART, an integral type of PWR with the capacity of 330MWth, has been developed for multi-purposes such as seawater desalination, ship propulsion, and district heating in Korea since early 1990s. The basic design of the SMART had been completed in 2002. For the demonstration of the safety and performance of the SMART, a project to construct a 1/5 scaled-down prototype reactor with capacity of 65MWth, called as SMART-P(SMART Pilot Plant), has been performed from 2002 to 2006. However, in 2006, the project to construct the SMART-P was replaced with a preliminary project to develop a commercial SMART in order to advance commercialization of the SMART. Since the SMART is the first commercial reactor adopting the integral design concept and new system/components such as passive residual heat removal system, canned motor pump, and helical tube steam generator in Korea, some verification tests need to be performed to demonstrate the safety and performance of the SMART. Also, since several new design computer codes that have not yet been confirmed by the regulatory body are expected to be used in the design, some validation tests should be performed to demonstrate their applicability for important accident phenomena. In order to carry out the SMART development project satisfactorily and to prevent any undesirable delay of licensing process, it is necessary to establish a well-planned verification test program in advance through the early identification of the scope and items of the verification tests. Also, the issues for which either policy decision-makings or detailed technical evaluations are needed should be identified in an early stage of design, and the regulatory positions for the issues should be provided either timely or in advance. Advance identification of regulatory requirements/guides to be amended or newly developed enables to provide regulatory directions for such items in the early stage of design. The objective of this paper is to introduce the current

  9. Preliminary Study on the Establishment of Regulatory Infrastructure for a Commercial SMART Licensing

    International Nuclear Information System (INIS)

    Yune, Young Gill; Roh, Kyung Wan; Kang, Dong Gu; Kim, Hho Jung; Jo, Jong Chull

    2007-01-01

    The SMART, an integral type of PWR with the capacity of 330MWth, has been developed for multi-purposes such as seawater desalination, ship propulsion, and district heating in Korea since early 1990s. The basic design of the SMART had been completed in 2002. For the demonstration of the safety and performance of the SMART, a project to construct a 1/5 scaled-down prototype reactor with capacity of 65MWth, called as SMART-P(SMART Pilot Plant), has been performed from 2002 to 2006. However, in 2006, the project to construct the SMART-P was replaced with a preliminary project to develop a commercial SMART in order to advance commercialization of the SMART. Since the SMART is the first commercial reactor adopting the integral design concept and new system/components such as passive residual heat removal system, canned motor pump, and helical tube steam generator in Korea, some verification tests need to be performed to demonstrate the safety and performance of the SMART. Also, since several new design computer codes that have not yet been confirmed by the regulatory body are expected to be used in the design, some validation tests should be performed to demonstrate their applicability for important accident phenomena. In order to carry out the SMART development project satisfactorily and to prevent any undesirable delay of licensing process, it is necessary to establish a well-planned verification test program in advance through the early identification of the scope and items of the verification tests. Also, the issues for which either policy decision-makings or detailed technical evaluations are needed should be identified in an early stage of design, and the regulatory positions for the issues should be provided either timely or in advance. Advance identification of regulatory requirements/guides to be amended or newly developed enables to provide regulatory directions for such items in the early stage of design. The objective of this paper is to introduce the current

  10. Organizational behavior of regulatory agencies: a case study of the Bureau of Consumer Services in the Pennsylvania Public Utility Commission

    Energy Technology Data Exchange (ETDEWEB)

    Silver, J.H.

    1981-01-01

    Regulatory agencies operate in a complex field of organizations and interest groups. The variety of behaviors that occur in the regulatory field are not satisfactorily explained by current interpretative frameworks. Regulatory agencies are at once criticized and praised. They flourish as organizational entities, yet they exhibit behavior that is often inexplicable. Notions like clientele capture, the politics of regulation, exchange theory, and institutionalized organizations do not singly explain the vagaries of regulatory behavior. A merger of these viewpoints, however, provides a foundation for a comprehensive interpretative framework. A bureau of consumer services within a state public utility commission is viewed as an institutionalized organization. From this perspective, a variety of ritual behaviors, based upon symbolic and tangible interorganizational exchanges are observed and characterized. The outcome of these exchanges is the establishment of the Bureau of Consumer Services as a legitimate regulatory agent with significant impact upon the formulation of regulatory policy in the formal proceedings of the Pennsylvania Public Utility Commission.

  11. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Supplement 2 to Digest No. 1

    International Nuclear Information System (INIS)

    1978-02-01

    This is the second in a series of Supplements to the NRC Practice and Procedure Digest. This Supplement updates the Digest by including pertinent Commission, Appeal Board, and Licensing Board rulings for the period April 1, 1977 to September 30, 1977. The Supplement also adds a number of new topics. The Supplement is structured in the same manner as the Digest. For the convenience of users, the text of the Supplement is preceded by an index which lists the Digest topic headings which are supplemented. In using the main Digest, this index to Supplement 2 as well as the index to Supplement 1 should be consulted to assure that the Digest discussion has not been superseded or updated by information in the Supplements

  12. 75 FR 8754 - Notice of Environmental Assessment Related to the Issuance of a License Amendment to Masters...

    Science.gov (United States)

    2010-02-25

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 030-34325; NRC-2010-0068] Notice of Environmental Assessment Related to the Issuance of a License Amendment to Masters Materials License 03-23853-01VA, for Unrestricted Release of a Department of Veterans Affairs Facility in Gainesville, FL AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of...

  13. 77 FR 7613 - Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108

    Science.gov (United States)

    2012-02-13

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-264; NRC-2012-0026] Dow Chemical Company; Dow Chemical TRIGA Research Reactor; Facility Operating License No. R-108 AGENCY: Nuclear Regulatory Commission... Facility Operating License No. R-108 (``Application''), which currently authorizes the Dow Chemical Company...

  14. 77 FR 35079 - License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC

    Science.gov (United States)

    2012-06-12

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-443; NRC-2010-0206] License Renewal Application for Seabrook Station, Unit 1 ; NextEra Energy Seabrook, LLC AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent to prepare supplement to draft [[Page 35080

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  16. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  18. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  19. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  20. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  3. Support in the development of Regulatory Procedures for licensing Lepse Waste Management Operations

    International Nuclear Information System (INIS)

    2001-05-01

    This report describes a project intended to assist Gosatomnadzor of Russia develop a set of documents defining the regulatory requirements for information to be submitted to Gosatomnadzor in support of any application for a licence relating to the removal of spent nuclear fuel from the depot ship Lepse. The project resulted in the development of three regulatory documents covering the documentation required in support of a licence application, the requirements for quality assurance arrangements and the safety analysis report. The working method adopted involved staged development of draft material and review at workshops involving a wide variety of relevant Russian and western organizations. The input and output of the workshops was fully documented to provide an audit trail for the document development and the rationale for what has been included and what is excluded and why. The availability of the regulatory documents in English should significantly assist in the use of the documents by western partners in the actual industrial project. Important experience and information was exchanged among participants in the project. The developing understanding is an important element in providing confidence, from a western perspective, that appropriate regulatory supervision can be applied to industrial projects supported by organizations such as the European Commission and national agencies. The same working methods could be used in the next phase of Lepse regulatory support, i.e., support in development of the procedures for the regulatory review of licence applications, and, subsequently, support in the application of the regulatory inspection process to ensure licence conditions are being complied with. Similarly, these working methods could be used in providing regulatory support for nuclear and radiation safety related to other industrial projects involving radioactive waste management. The participants in this sub-project described in this report were Norwegian

  4. Nuclear knowledge portal for supporting licensing and controlling nuclear activities in the Brazilian Nuclear Energy Commission

    International Nuclear Information System (INIS)

    Gomes, E.; Braga, F.

    2005-01-01

    The knowledge economy is pivotal for moving the wealth and development of traditional industrial sectors - abundant in manual labour, raw materials and capital - to areas whose products, processes and services are rich in technology and knowledge. Even in research areas such as nuclear energy, where goods are based on high technology, the ability to transform information into knowledge, and knowledge into decisions and actions, is extremely important. Therefore, the value of products from these areas depends more and more on the degree of innovation, technology and intelligence incorporated by them. Thus, it has become increasingly important and relevant to acquire strategic knowledge and make it available to the organisation. Therefore, the objective of this paper is to present the construction of a Nuclear Knowledge Portal for aiding and streamlining the Licensing and Management activities of the CNEN. (author)

  5. Nuclear knowledge portal to support licensing and control nuclear activities in the Brazilian Nuclear Energy Commission

    International Nuclear Information System (INIS)

    Gomes, M.E.; Braga, M.F.

    2004-01-01

    The Knowledge Economy is pivotal for moving the wealth and development of traditional industrial sectors - abundant in manual labor, raw materials and capital - to areas whose products, processes and services are rich in technology and knowledge. Even in research areas such as nuclear energy, where goods are based on high technology, the ability to transform information into knowledge, and knowledge into decisions and actions, is extremely important. Therefore, the value of products from these areas depends more and more on the degree of innovation, technology and intelligence incorporated by them. Thus, it has become increasingly important and relevant to acquire strategic knowledge and make it available to the organization. Therefore, the objective of this article is to present the construction of a Nuclear Knowledge Portal for aiding and streamlining the Licensing and Management activities of the CNEN. (author)

  6. Special committee review of the Nuclear Regulatory Commission's severe accident risks report (NUREG--1150)

    International Nuclear Information System (INIS)

    Kouts, H.J.C.; Apostolakis, G.; Kastenberg, W.E.; Birkhofer, E.H.A.; Hoegberg, L.G.; LeSage, L.G.; Rasmussen, N.C.; Teague, H.J.; Taylor, J.J.

    1990-08-01

    In April 1989, the Nuclear Regulatory Commission's (NRC) Office of Nuclear Regulatory Research (RES) published a draft report ''Severe Accident Risks: An Assessment for Five US Nuclear Power Plants,'' NUREG-1150. This report updated, extended and improved upon the information presented in the 1974 ''Reactor Safety Study,'' WASH-1400. Because the information in NUREG-1150 will play a significant role in implementing the NRC's Severe Accident Policy, its quality and credibility are of critical importance. Accordingly, the Commission requested that the RES conduct a peer review of NUREG-1150 to ensure that the methods, safety insights and conclusions presented are appropriate and adequately reflect the current state of knowledge with respect to reactor safety. To this end, RES formed a special committee in June of 1989 under the provisions of the Federal Advisory Committee Act. The Committee, composed of a group of recognized national and international experts in nuclear reactor safety, was charged with preparing a report reflecting their review of NUREG-1150 with respect to the adequacy of the methods, data, analysis and conclusions it set forth. The report which precedes reflects the results of this peer review

  7. Nuclear plant license renewal

    International Nuclear Information System (INIS)

    Gazda, P.A.; Bhatt, P.C.

    1991-01-01

    During the next 10 years, nuclear plant license renewal is expected to become a significant issue. Recent Electric Power Research Institute (EPRI) studies have shown license renewal to be technically and economically feasible. Filing an application for license renewal with the Nuclear Regulatory Commission (NRC) entails verifying that the systems, structures, and components essential for safety will continue to perform their safety functions throughout the license renewal period. This paper discusses the current proposed requirements for this verification and the current industry knowledge regarding age-related degradation of structures. Elements of a license renewal program incorporating NRC requirements and industry knowledge including a schedule are presented. Degradation mechanisms for structural components, their significance to nuclear plant structures, and industry-suggested age-related degradation management options are also reviewed

  8. Improving regulatory effectiveness in Federal/State siting actions: Federal/State regulatory permitting actions in selected nuclear power station licensing cases

    International Nuclear Information System (INIS)

    Baroff, J.

    1977-06-01

    The Federal/State regulatory permitting actions in 12 case histories of nuclear power station licensing in nine different states are documented. General observations regarding Federal/State siting roles in the siting process are included. Eleven of the case histories are illustrated with a logic network that gives the actions of the utilities in addition to the Federal/State permits

  9. Preservation and Implementation of Decommissioning Lessons Learned in the United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Rodriguez, Rafael L.

    2008-01-01

    Over the past several years, the United States Nuclear Regulatory Commission (NRC) has actively worked to capture and preserve lessons learned from the decommissioning of nuclear facilities. More recently, NRC has involved industry groups, the Organization of Agreement States (OAS), and the Department of Energy (DOE) in the effort to develop approaches to capture, preserve and disseminate decommissioning lessons learned. This paper discusses the accomplishments of the working group, some lessons learned by the NRC in the recent past, and how NRC will incorporate these lessons learned into its regulatory framework. This should help ensure that the design and operation of current and future nuclear facilities will result in less environmental impact and more efficient decommissioning. In summary, the NRC will continue capturing today's experience in decommissioning so that future facilities can take advantage of lessons learned from today's decommissioning projects. NRC, both individually and collectively with industry groups, OAS, and DOE, is aggressively working on the preservation and implementation of decommissioning lessons learned. The joint effort has helped to ensure the lessons from the whole spectrum of decommissioning facilities (i.e., reactor, fuel cycle, and material facilities) are better understood, thus maximizing the amount of knowledge and best practices obtained from decommissioning activities. Anticipated regulatory activities at the NRC will make sure that the knowledge gained from today's decommissioning projects is preserved and implemented to benefit the nuclear facilities that will decommission in the future

  10. 76 FR 18457 - Regulatory Review Schedule; Tribal Consultation

    Science.gov (United States)

    2011-04-04

    ... that the NIGC provide tribal gaming commissions access to licensing information via an online database... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule; Tribal Consultation AGENCY: National Indian Gaming Commission. ACTION: Notice of Regulatory...

  11. Introductory user's manual for the US Nuclear Regulatory Commission Reactor Safety Research Data Bank

    International Nuclear Information System (INIS)

    Scofield, N.R.; Hardy, H.A.; Laats, E.T.

    1983-02-01

    The United States Nuclear Regulatory Commission (NRC) has established the NRC/Division of Accident Evaluation (DAE) Data Bank Program to collect, store, and make available data from the many domestic and foreign water safety research programs. Local direction of the program is provided by E G and G Idaho, Inc., prime contractor for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). The NRC/DAE Data Bank Program provides a central computer storage mechanism and access software for data that is to be used by code development and assessment groups in meeting the code and correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, training, and advisory services to users and the NRC. The NRC/DAE Data Bank and the capabilities of the data access software are described

  12. The latest occupational radiation exposure data from U.S. Nuclear Regulatory Commission Licensees

    International Nuclear Information System (INIS)

    Brock, T.

    2007-01-01

    This presentation summarizes the latest - 2005 occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commission (NRC) Radiation Exposure Information and Reporting System. The bulk of the information contained in the paper was compiled from the 2005 annual reports submitted by NRC licensees subject to the reporting requirements of U.S. regulations (10 CFR 20.2206). Those licensees subject to reporting include commercial nuclear power plants, industrial radiographers, fuel processors, independent spent fuel storage installations, manufacturers and distributors of by-product material, facilities for low-level waste disposal, and geologic repositories for high-level waste. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in terms of collective dose and the distribution of doses by licensee category. (author)

  13. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1986

    International Nuclear Information System (INIS)

    1987-05-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during calendar year 1986. Comments and observations are provided on operating experience at nuclear power plants and other NRC licensees, including results from selected AEOD studies; summaries of abnormal occurrences involving US nuclear plants; reviews of licensee event reports and their quality, reactor scram experience from 1984 to 1986, engineered safety features actuations, and the trends and patterns analysis program; and assessments of nonreactor and medical misadministration events. In addition, the report provides the year-end status of all recommendations included in AEOD studies, and listings of all AEOD reports issued from 1980 through 1986

  14. Introductory user's manual for the US Nuclear Regulatory Commission Reactor Safety Research Data Bank. Revision 3

    International Nuclear Information System (INIS)

    Hardy, H.A.; Laats, E.T.

    1985-03-01

    The United States Nuclear Regulatory Commission (USNRC) has established the NRC/Division of Accident Evaluation (DAE) Data Bank Program to collect, store, and make available data from the many domestic and foreign water reactor safety research programs. Local direction of the program is provided by EG and G Idaho, Inc., prime contractor for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). The NRC/DAE Data Bank Program provides a central computer storage mechanism and access software for data to be used by code development and assessment groups in meeting the code correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, training, and advisory services to users and the USNRC. The NRC/DAE Data Bank and the capabilities of the data access software are described in this document

  15. Interim report to the Nuclear Regulatory Commission on radioactive waste classification

    International Nuclear Information System (INIS)

    King, W.C.; Cohen, J.J.

    1977-01-01

    The Lawrence Livermore Laboratory assisted the Nuclear Regulatory Commission in the development of a radioactive waste classification system that will satisfy technical, environmental, and societal concerns. This is an interim report to the NRC on work accomplished to date. It describes a proposed waste-classification system that is based on the final disposition of waste material. The system consists of three classes of radioactive waste. The classification of any radioactive waste will depend primarily on its hazard potential. Other characteristics such as longevity (half-size) will be considered also. The levels of hazard that differentiate the three classes of radioactive waste will be determined by ongoing work. This report describes other work to be completed before a suitable radioactive waste-classificaion system is established

  16. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1987: Nonreactors

    International Nuclear Information System (INIS)

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactor events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD reports issued for 1980-1987

  17. Yellin's review of the Nuclear Regulatory Commission's Reactor Safety Study: comment

    International Nuclear Information System (INIS)

    Wilson, R.

    1976-01-01

    Joel Yellin (Bell J. Economics, Vol. 7, No. 1 (Spr. 1976)) reviewed the Reactor Safety Study (WASH-1400, or Rasmussen Report) published by the Nuclear Regulatory Commission and makes several criticisms. Wilson finds that some of these criticisms are much overstated, while others, although valid, are mainly criticisms of presentation. To be useful for public policy, reactor risks--and indeed all nuclear risks--must be compared with other risks society faces. Wilson feels that the Rasmussen Report is weak in these comparisons, primarily because there exist few estimates of risk in other places, but that the comparisons he does make indeed confirm that the risk is smaller than Yellin suggests. 20 references

  18. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  19. Site-specific parameter values for the Nuclear Regulatory Commission's food pathway dose model

    International Nuclear Information System (INIS)

    Hamby, D.M.

    1992-01-01

    Routine operations at the Savannah River Site (SRS) in Western South Carolina result in radionuclide releases to the atmosphere and to the Savannah River. The resulting radiation doses to the off-site maximum individual and the off-site population within 80 km of the SRS are estimated on a yearly basis. These estimates are currently generated using dose models prescribed for the commercial nuclear power industry by the Nuclear Regulatory Commission (NRC). The NRC provides default values for dose-model parameters for facilities without resources to develop site-specific values. A survey of land- and water-use characteristics for the Savannah River area has been conducted to determine site-specific values for water recreation, consumption, and agricultural parameters used in the NRC Regulatory Guide 1.109 (1977) dosimetric models. These site parameters include local characteristics of meat, milk, and vegetable production; recreational and commercial activities on the Savannah River; and meat, milk, vegetable, and seafood consumption rates. This paper describes how parameter data were obtained at the Savannah River Site and the impacts of such data on off-site dose. Dose estimates using site-specific parameter values are compared to estimates using the NRC default values

  20. Future directions for the US Nuclear Regulatory Commission's low-level waste management program

    International Nuclear Information System (INIS)

    Starmer, R.J.

    1986-01-01

    The Low-Level Radioactive Waste Policy Act envisioned that all states would be able to dispose of commercial low-level waste generated within their borders by 1986, either individually or through interstate compacts. Based on the current status of state and compact efforts, it is clear that no new disposal sites will be available by 1986 or for some period thereafter. In the short-term, there is uncertainty that the existing disposal sites will remain open after January 1, 1986, or if restrictions will apply after that time. If restrictions occur, storage, treatment or even curtailed generation may result for individual waste producers. Other uncertainties clouding implementation of the Policy Act include the final configuration of regional compacts - in the northeast in particular - clear assignment of responsibility for disposal of classes of waste, the method of disposal - shallow land burial or alternatives - that will be employed for low-level waste, and regulation of mixed wastes, wastes which have both radioactive and non-radioactive hazardous constituents. The NRC strategy for low-level waste management aims to resolve or reduce these uncertainties, and to encourage transition to a stable, national system based on timely state action. NRC will continue development of regulatory and technical guidance for disposal site licensing and build on its capabilities to address specific areas of state concern, such as alternatives to shallow land burial, and site characterization and modeling. NRC also plans to expand state and compact outreach efforts to help ensure that our technical work is properly focused. The authors will also be directly assisting those states and compacts on technical matters they confront in actual disposal site development and licensing