WorldWideScience

Sample records for regulatory commission issued

  1. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    Science.gov (United States)

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  2. Nuclear Regulatory Commission information digest

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  3. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  4. Nuclear Regulatory Commission 1989 Information Digest

    International Nuclear Information System (INIS)

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  5. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  6. 75 FR 27028 - Joint CFTC-SEC Advisory Committee on Emerging Regulatory Issues

    Science.gov (United States)

    2010-05-13

    ... regulatory issues and their potential impact on investors and the securities markets. The Committee will lend... SECURITIES AND EXCHANGE COMMISSION [Release No. 33-9123; File No. 265-26] COMMODITY FUTURES TRADING COMMISSION Joint CFTC-SEC Advisory Committee on Emerging Regulatory Issues AGENCY: Securities and...

  7. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    Science.gov (United States)

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  8. Indexes to Nuclear Regulatory Commission issuances, July--September 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This digest and index lists the Nuclear Regulatory Commission (NRC) issuances for July to September 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. There are five sections to this index: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index. The digest provides a brief narrative of the issue, including the resolution of the issue and any legal references used for resolution

  9. State regulatory issues in acid rain compliance

    International Nuclear Information System (INIS)

    Solomon, B.D.; Brick, S.

    1992-01-01

    This article discusses the results of a US EPA workshop for state regulators and commission staff on acid rain compliance concerns. The topics of the article include the results of market-based emissions control, how emissions trading is expected to reduce emissions, public utility commissions approval of compliance plans, the purposes of the workshop, market information, accounting issues, regulatory process and utility planning, multi-state compliance planning, and relationship to other compliance issues

  10. Review report: safety and reliability issues on digital instrumentation and control systems in nuclear power plants and United States Nuclear Regulatory Commission`s dispositions

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, Norio; Suzudo, Tomoaki [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-09-01

    Recently, digital instrumentation and control (I and C) systems have been applied to nuclear power plants (NPPs) in various countries. Introduction of digital I and C systems, however, raises special issues on design, implementation, safety and licensing. Since FY 1997, the Japan Atomic Energy Research Institute (JAERI) has been carrying out a project, Study on Reliability of Digital I and C Systems, which includes extensive reviews of design approaches, technical standards, regulatory processes, especially, in the United States. This report summarizes the results from the study of National Research Council (NRC) and the U.S. Nuclear Regulatory Commission`s (USNRC`s) responses to the recommendations made by the NRC`s study. That study identified six technical key issues (system aspects of digital I and C technology, software quality assurance, common-mode software failure potential, safety and reliability assessment methods, human factors and man-machine interface, dedication of commercial off-the-shelf hardware and software) and two strategic key issues (case-by-case licensing process, adequacy of technical infrastructure) that arise from the introduction of digital I and C technology and then, made recommendations to the USNRC for coping with digital I and C applications. The USNRC responded to each recommendation and showed their own dispositions in which the USNRC agreed with most of the recommendations. In Japan, it is expected that introduction of digital I and C technology is inevitable in NPPs because the vendors are gradually discontinuing support and stocking of analog components. To cope with such situations, there is a need to develop and update the standards and guidelines applicable to digital I and C technology. The key issues and the USNRC`s dispositions provided in this report is believed to be useful for developing and updating them. (J.P.N.)

  11. Nuclear Regulatory Commission: more aggressive leadership needed

    International Nuclear Information System (INIS)

    Staats, E.B.

    1980-01-01

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation

  12. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    International Nuclear Information System (INIS)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2

  13. 77 FR 34379 - Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory...

    Science.gov (United States)

    2012-06-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD06-6-000] Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold a joint meeting...

  14. Regulatory Commission of Alaska

    Science.gov (United States)

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  15. Nuclear Regulatory Commission Issuances: February 1995. Volume 41, Number 2

    International Nuclear Information System (INIS)

    1995-02-01

    This book contains an issuance of the Nuclear Regulatory Commission and a Director's Decision. The issuance concerns consideration by the Commission of appeals from both the Initial Decision and a Reconsideration Order issued by the Presiding Officer involving two materials license amendment applications filed by the University of Missouri. The Director's Decision from the Office of Enforcement denies petitions filed by Northeast Utilities employees requesting that accelerated enforcement action be taken against Northeast Utilities for activities concerned with NU's fitness-for-duty program

  16. 76 FR 10072 - Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX, Adequacy of Station...

    Science.gov (United States)

    2011-02-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0013] Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX, Adequacy of Station Electric Distribution System Voltages; Reopening of... (NRC's) Draft Regulatory Issue Summary 2011-XX, Adequacy of Station Electric Distribution System...

  17. Regulatory issues associated with the Multi-Purpose (MPC) system

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Morgan, R.G.

    1994-01-01

    The US Department of Energy Office of Civilian Radioactive Waste Management is developing a Multi-Purpose Canister system to promote compatibility between the waste program elements of storage, transportation, and disposal. The development of a Multi-Purpose Canister system requires meeting various regulatory requirements. These regulatory requirements are set forth in environmental and Nuclear Regulatory Commission (NRC) regulations. This paper discusses the more significant regulatory issues that must be addressed in the development of a Multi-Purpose Canister system by the Department of Energy

  18. Nuclear Regulatory Commission Information Digest: 1993 edition

    International Nuclear Information System (INIS)

    1993-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the U.S. Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1992, with exceptions noted. Information on generating capacity and average capacity factor for operating U.S. commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed. Comments and/or suggestions on the data presented are welcomed and should be directed to Karen Olive, United States Nuclear Regulatory Commission, Office of the Controller, Division of Budget and Analysis, Washington, D.C. 20555. For detailed and complete information about tables and figures, refer to the source publications

  19. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  20. Steam Generator tube integrity -- US Nuclear Regulatory Commission perspective

    International Nuclear Information System (INIS)

    Murphy, E.L.; Sullivan, E.J.

    1997-01-01

    In the US, the current regulatory framework was developed in the 1970s when general wall thinning was the dominant degradation mechanism; and, as a result of changes in the forms of degradation being observed and improvements in inspection and tube repair technology, the regulatory framework needs to be updated. Operating experience indicates that the current U.S. requirements should be more stringent in some areas, while in other areas they are overly conservative. To date, this situation has been dealt with on a plant-specific basis in the US. However, the NRC staff is now developing a proposed steam generator rule as a generic framework for ensuring that the steam generator tubes are capable of performing their intended safety functions. This paper discusses the current U.S. regulatory framework for assuring steam generator (SG) tube integrity, the need to update this regulatory framework, the objectives of the new proposed rule, the US Nuclear Regulatory Commission (NRC) regulatory guide (RG) that will accompany the rule, how risk considerations affect the development of the new rule, and some outstanding issues relating to the rule that the NRC is still dealing with

  1. 77 FR 12089 - Proposed Generic Communication; Regulatory Issue Summary 2012-XX: Developing Inservice Testing...

    Science.gov (United States)

    2012-02-28

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0048] Proposed Generic Communication; Regulatory Issue... CFR) Part 52, ``Licenses, Certifications, and Approvals for Nuclear Power Plants,'' to satisfy the... inservice testing programs during the initial 120-month program interval following nuclear power plant...

  2. 75 FR 62153 - Notice of the Nuclear Regulatory Commission Issuance of Materials License SUA-1596 for Uranium...

    Science.gov (United States)

    2010-10-07

    ... Commission Issuance of Materials License SUA-1596 for Uranium One Americas, Inc. Moore Ranch In Situ Recovery.... SUPPLEMENTARY INFORMATION: The Nuclear Regulatory Commission (NRC) has issued a license to Uranium One Americas, Inc. (Uranium One) for its Moore Ranch uranium in situ recovery (ISR) facility in Campbell County...

  3. Federal Energy Regulatory Commission (FERC) Regions

    Data.gov (United States)

    Department of Homeland Security — Federal Energy Regulatory Commission (FERC) Regions. FERC is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil....

  4. Nuclear Regulatory Commission Information Digest 1992 edition

    International Nuclear Information System (INIS)

    Olive, K.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  5. Regulatory issues resolved through design certification on the System 80+trademark standard plant design

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Brinkman, C.B.

    1996-01-01

    The US Nuclear Regulatory Commission (NRC) has completed its review of the System 80+trademark Standard Plant Design, approving advanced design features and closing severe accident licensing issues. Final Design Approval was granted in July 1994. The NRC review was extensive, requiring written responses to over 4,950 questions and formal printing of over 50,000 Safety Analysis Report pages. New safety issues never before addressed in a regulatory atmosphere had to be resolved with detailed analysis and evaluation of design features. the System 80+ review demonstrated that regulatory issues can be firmly resolved only through presentation of a detailed design and completion of a comprehensive regulatory review

  6. KWOC [Key-Word-Out-of-Context] Index of US Nuclear Regulatory Commission Regulatory Guide Series

    International Nuclear Information System (INIS)

    Jennings, S.D.

    1990-04-01

    To meet the objectives of the program funded by the Department of Energy (DOE)-Nuclear Energy (NE) Technology Support Programs, the Performance Assurance Project Office (PAPO) administers a Performance Assurance Information Program that collects, compiles, and distributes program-related information, reports, and publications for the benefit of the DOE-NE program participants. THE ''KWOC Index of US Nuclear Regulatory Commission Regulatory Guide Series'' is prepared as an aid in searching for specific topics in the US Nuclear Regulatory Commission, Regulatory Guide Series

  7. Nuclear Regulatory Commission Issuances, November 1980

    International Nuclear Information System (INIS)

    1980-11-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  8. Nuclear Regulatory Commission Issuances, December 1980

    International Nuclear Information System (INIS)

    1980-12-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  9. Why Banning Embedded Sales Commissions Is a Public Policy Issue

    OpenAIRE

    Henri-Paul Rousseau

    2017-01-01

    Regulatory authorities have consulted on the option of banning embedded sales commissions for Canadian financial advisors. Such an action would create more problems than it would solve. It would have serious ramifications for Canadians’ access to financial advice and raise issues of choice, industry concentration and price transparency for clients seeking advice on investments and retirement. Financial advisors have much greater knowledge of investments than their clients, who rightly expect ...

  10. Risk Assessment Review Group report to the U.S. Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Lewis, H.W.; Budnitz, R.J.; Kouts, H.J.C.; Loewenstein, W.B.; Rowe, W.D.; von Hippel, F.; Zachariasen, F.

    1978-09-01

    The Risk Assessment Review Group was organized by the U.S. Nuclear Regulatory Commission on July 1, 1977, with four elements to its charter: clarify the achievements and limitations of WASH-1400, the ''Rasmussen Report''; assess the peer comments thereon, and responses to those comments; study the present state of such risk assessment methodology; and recommend to the Commission how (and whether) such methodology can be used in the regulatory and licensing process. Areas of study include: risk assessment methodologies; statistical issues; completeness; the data base; and the WASH-1400 assessment of the damage to human health from radiation after a postulated accident. Specific items discussed include: Browns Ferry; common cause failure; human factors; format and scrutability; the peer review process; earthquakes; risk perception; allegations by UCS concerning WASH-1400 treatment of quality assurance and quality control; current role of probabilistic methods in the regulatory process; acts of violence; ATWS; influence of design defects in quality assurance failures; and calculation of population doses from given releases of radionuclides

  11. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

  12. Nuclear Regulatory Commission Information Digest, 1991 edition

    International Nuclear Information System (INIS)

    Olive, K.L.

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs

  13. 17 CFR 201.421 - Commission consideration of determinations by self-regulatory organizations.

    Science.gov (United States)

    2010-04-01

    ... determinations by self-regulatory organizations. 201.421 Section 201.421 Commodity and Securities Exchanges... Commission Review § 201.421 Commission consideration of determinations by self-regulatory organizations. (a..., order review of any determination by a self-regulatory organization that could be subject to an...

  14. The role of effective communications in Nuclear Regulatory Commission licensing

    International Nuclear Information System (INIS)

    Counsil, W.G.

    1991-01-01

    Communications are essential to the licensing and general regulatory program of the Nuclear Regulatory Commission. This paper attempts to identify and address certain aspects of, and approaches to, maintaining effective and efficient communications. It considers, from the perspective of the high-level radioactive waste repository program, both internal communication within the DOE itself and external communication with the Nuclear Regulatory Commission and interested parties. Many of the points presented are based on lessons learned from electric utility experience with nuclear plants

  15. 75 FR 54917 - Criteria for Nominating Materials Licensees for the U.S. Nuclear Regulatory Commission's Agency...

    Science.gov (United States)

    2010-09-09

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0294] Criteria for Nominating Materials Licensees for the U.S. Nuclear Regulatory Commission's Agency Action Review Meeting AGENCY: Nuclear Regulatory Commission. ACTION: Request for comment. SUMMARY: It is the policy of the U.S. Nuclear Regulatory Commission...

  16. 76 FR 57006 - Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX; NRC Regulation of...

    Science.gov (United States)

    2011-09-15

    ... NUCLEAR REGULATORY COMMISSION 10 CFR Parts 30 and 150 [NRC-2011-0146] Proposed Generic Communications; Draft NRC Regulatory Issue Summary 2011-XX; NRC Regulation of Military Operational Radium-226... published for public comment the proposed draft RIS 2011-XX; NRC Regulation of Military Operational Radium...

  17. Nuclear Regulatory Commission issuances, October 1993

    International Nuclear Information System (INIS)

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  18. Transforming public utility commissions in the new regulatory environment: Some issues and ideas for managing change

    Energy Technology Data Exchange (ETDEWEB)

    Wirick, D.W.; Davis, V.W.; Burns, R.E.; Jones, D.N.

    1996-07-01

    In the face of sweeping changes in utility markets and regulatory practices, public utility commissions are being forced to change in fundamental ways--to substantially transform themselves rather than to make only incremental changes in their operations. Managing this process of radical change is complicated by the fact that for the foreseeable future some portions of utility markets (e.g., water utilities) will function much as they have before. Some envision commissions in the future that are more externally focussed, that rely more on dispute resolution than adjudicatory proceedings, that concentrate on identifying and understanding competitive markets, that are more automated, and that are more likely to question old assumptions and definitions. This report identifies the considerations commissions might apply for identifying what mix of skills or fields of experise should compromise the technical staff. Factors are also identified which point towards a sectoral arrangement of staff and those factors which point toward a functional approach.

  19. U.S. nuclear fuel cycle regulatory issues on exclusion, exemption, and clearance

    International Nuclear Information System (INIS)

    Meck, R.A.

    1997-01-01

    The U.S. Nuclear Regulatory Commission is considering the use of exclusion and clearance in connection with the nuclear fuel cycle regulations. Clearance of licensed lands, buildings, structures, materials, and equipment could expose members of the public to radiation in addition to background. Establishing and implementing dose criteria for allowed concentrations of radioactivity in the various media raise challenging issues for the regulator. Clearance also raises significant regulatory issues, and these issues reflect trade-offs between concerns for protecting public health and safety, as well as other socioeconomic values and concerns. At the heart of the issues are the adequacy of risk analyses, acceptability of risks, underlying rationales, feasibility and cost of implementation, and exposures of the public to man-made radiation in relation to natural sources of radiation. (author)

  20. Key Regulatory Issues for Digital Instrumentation and Control Systems at Nuclear Power Plants

    International Nuclear Information System (INIS)

    Korsah, Kofi; Wood, Richard Thomas

    2008-01-01

    To help reduce the uncertainty associated with application of digital instrumentation and controls (I and C) technology in nuclear power plants, the Nuclear Regulatory Commission (NRC) has issued six Interim Staff Guidance (ISG) documents that address the current regulatory positions on what are considered the significant digital I and C issues. These six documents address the following topics: Cyber Security, Diversity and Defense-in-Depth, Risk Informed Digital I and C Regulation, Communication issues, Human Factors and the Digital I and C Licensing Process (currently issued as Draft). After allowing for further refinement based on additional technical insight gathered by NRC staff through near-term research and detailed review of relevant experience, it is expected that updated positions ultimately will be incorporated into regulatory guides and staff review procedures. This paper presents an overview of the guidance provided by the NRC-issued ISGs on key technology considerations (i.e., the first five documents above) for safety-related digital I and C systems.

  1. Indexes to Nuclear Regulatory Commission issuance, July-December 1980. Index of Volume 12, Number 4

    International Nuclear Information System (INIS)

    1980-01-01

    Issuances of the Atomic Safety and Licensing Board (ASLB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Administrative Law Judge (ALJ), regulatory issuances of the Commission (CLI), the Directors Denial (DD), and the Denials of Petitions for Rulemaking for the period July through December 1980 appear in Nuclear Regulatory Commission Issuances, 12 NRC No. 1, Pages 1-136, through 12 NRC No. 6, Pages 607-742. Digests and indexes for these issuances are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); Name of facility, docket number; Type of hearing (for construction permit, operating licenses, etc.); Issues raised by appellants; Issuance number; Type of issuance (memorandum, order, decision, etc.); Issuance pagination; Legal citations (cases, regulations, and statutes); and Subject matter of issues and/or rulings. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; Digests and headers; Legal citation index; Subject index; and Facility index

  2. 1992 Nuclear Regulatory Commission Annual Report

    International Nuclear Information System (INIS)

    1993-01-01

    This is the 18th annual report of the US Nuclear Regulatory Commission (NRC), covering events and activities occurring in fiscal year 1992 (the year ending September 30, 1992), with some treatment of events from the last quarter of calendar year 1992. The NRC was created by enactment in the Congress of the Energy Reorganization Act of 1974. It is an independent agency of the Federal Government. The five NRC Commissioners are nominated by the President and confirmed by the United States Senate. The Chairman of the Commission is appointed by the President from among the Commissioners confirmed

  3. Improved cost-benefit techniques in the US Nuclear Regulatory Commission

    Energy Technology Data Exchange (ETDEWEB)

    Cronin, F.J.; Nesse, R.J.; Vaeth, M.; Wusterbarth, A.R.; Currie, J.W.

    1983-06-01

    The major objective of this report is to help the US Nuclear Regulatory Commission (NRC) in its regulatory mission, particularly with respect to improving the use of cost-benefit analysis and the economic evaluation of resources within the NRC. The objectives of this effort are: (1) to identify current and future NRC requirements (e.g., licensing) for valuing nonmarket goods; (2) to identify, highlight, and present the relevant efforts of selected federal agencies, some with over two decades of experience in valuing nonmarket goods, in this area; and (3) to review methods for valuing nonmarket impacts and to provide estimats of their magnitudes. Recently proposed legislation may result in a requirement for not only more sophisticated valuation analyses, but more extensive applications of these techniques to issues of concern to the NRC. This paper is intended to provide the NRC with information to more efficiently meet such requirements.

  4. 77 FR 8095 - Technical Corrections to Commission Regulations

    Science.gov (United States)

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 2 [Docket No. RM11-30-000; Order No. 756] Technical Corrections to Commission Regulations Issued February 8, 2012. AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule: correcting amendment. SUMMARY: This document adds...

  5. Enhancing regulatory effectiveness by improving the process for identifying and resolving generic issues

    International Nuclear Information System (INIS)

    Vander Molen, Harold J.

    2001-01-01

    The Generic Issues Program first began formally in response to a Commission directive in October of 1976. In 1983, it became one of the first programs to make successful use of probabilistic risk information to aid in regulatory decision-making. In the 16 years since the program became quantitative, 836 issues have been processed. Of these, 106 reactor safety issues were prioritized as requiring further evaluation to determine the final resolution. Approximately a dozen generic issues remain unresolved. Although there is far less reactor licensing activity than in the 1970s, new issues continue to be identified from research and operational experience. These issues often involve complex and controversial questions of safety and regulation, and an efficient and effective means of addressing these issues is essential for regulatory effectiveness. Issues that involve a significant safety question require swift, effective, enforceable, and cost-effective regulatory actions. Issues that are of little safety significance must be quickly shown to be so and dismissed in an expeditious manner so as to avoid unnecessary expenditure of limited resources and to reduce regulatory uncertainty. Additionally, in the time since the generic issue program began, probabilistic risk assessment techniques have advanced significantly while agency resources have continued to diminish. Accordingly, the paper discusses the steps that have been taken to enhance the effectiveness and efficiency of the generic issue resolution process. Additionally, four resolved issues are discussed, along with key elements of a proposed new procedure for resolving potential generic issues

  6. U.S. Nuclear Regulatory Commission human factors program plan

    International Nuclear Information System (INIS)

    1986-04-01

    The purpose of the U.S. Nuclear Regulatory Commission (NRC) Human Factors Program Plan is to ensure that proper consideration is given to human factors in the design and operation of nuclear facilities. This revised plan addresses human factors issues related to the operation of nuclear power plants (NPPs). The three issues of concern are (1) the activities planned to provide the technical bases to resolve the remaining tasks related to human factors as described in NUREG-0660, The NRC Action Plan Developed as a Result of the TMI-2 Accident, and NUREG-0737, Clarification of TMI Action Plan Requirements; (2) the need to address the additional human factors efforts that were identified during implementation of the Action Plan; and (3) the actual fulfillment of those developmental activities specified in Revision 1 of this plan. The plan represents a systematic approach for addressing high priority human factors concerns important to NPP safety in FY 1986 through 1987

  7. Nuclear Regulatory Commission probabilistic risk assessment implementation program: A status report

    International Nuclear Information System (INIS)

    Rubin, M.P.; Caruso, M.A.

    1996-01-01

    The US Nuclear Regulatory Commission (NRC) is undertaking a number of activities intended to increase the consideration of risk significance in its decision processes and the effective use of risk-based technologies in its regulatory activities. Although the NRC is moving toward risk-informed regulation throughout its areas of responsibilities, this paper focuses primarily on those issues associated with reactor regulation. As the NRC completed significant milestones in its development of probabilistic risk assessment (PRA) methodology and gained considerable experience in the limited application of risk assessment to selected regulatory activities, it became evident that a much broader use of risk informed approaches offered advantages to both the NRC and the US commercial nuclear industry. This desire to enhance the use of risk assessment is driven by the clear belief that application of PRA methods will result in direct improvements in nuclear power plant operational safety from the perspective of both the regulator and the plant operator. The NRC believed that an overall policy on the use of PRA methods in nuclear regulatory activities should be established so that the many potential applications of PRA could be implemented in a consistent and predictable manner that would promote regulatory stability and efficiency. This paper describes the key activities that the NRC has undertaken to implement the initial stages of an integrated risk-informed regulatory framework

  8. United States Nuclear Regulatory Commission staff practice and procedure digest

    International Nuclear Information System (INIS)

    1990-03-01

    This document contains procedures for review by US Nuclear Regulatory Commission for reviewing and deciding on matters pertaining to nuclear power plant licensing. Also, contained within the document are decisions the Commission has made between July 1972 to September 1989. (F.S.D.)

  9. Nuclear Regulatory Commission issuances, May 1993

    International Nuclear Information System (INIS)

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors' Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers

  10. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  11. 77 FR 15142 - Updated Nuclear Regulatory Commission Fiscal Years 2008-2013 Strategic Plan

    Science.gov (United States)

    2012-03-14

    ... 2008-2013 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Strategic plan. SUMMARY: The U...-1614, Volume 5, ``U.S. Nuclear Regulatory Commission, Fiscal Years [FY] 2008-2013 Strategic Plan,'' dated February 2012. The updated FY 2008-2013 strategic plan describes the agency's mission and...

  12. Law of the Energy Regulatory Commission

    International Nuclear Information System (INIS)

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  13. 76 FR 61402 - Draft Nuclear Regulatory Commission Fiscal Year 2012-2016 Strategic Plan

    Science.gov (United States)

    2011-10-04

    ...-2016 Strategic Plan AGENCY: Nuclear Regulatory Commission. ACTION: Draft NUREG; request for comment... comment on draft NUREG-1614, Volume 5. ``U.S. Nuclear Regulatory Commission, FY 2012-2016 Strategic Plan,'' dated September 2011. The NRC's draft FY 2012-2016 strategic plan describes the agency's mission and...

  14. Regional and International Networking to Support the Energy Regulatory Commission of Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Lavansiri, Direk; Bull, Trevor

    2010-09-15

    The Energy Regulatory Commission of Thailand is a new regulatory agency. The structure of the energy sector; the tradition of administration; and, the lack of access to experienced personnel in Thailand all pose particular challenges. The Commission is meeting these challenges through regional and international networking to assist in developing policies and procedures that allow it to meet international benchmarks.

  15. US Nuclear Regulatory Commission annual report, 1985. Volume 2

    International Nuclear Information System (INIS)

    1986-01-01

    The decisions and actions of the Nuclear Regulatory Commission (NRC) during fiscal year 1985 are reported. Areas covered include reactor regulation, cleanup at Three Mile Island, analysis and evaluation of operational experience, nuclear materials, waste management, safeguards, inspection, enforcement, quality assurance, emergency preparedness, and nuclear regulatory research. Also, cooperation with the states, international programs, proceedings and litigation, and management are discussed

  16. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1990-01-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  17. Regulatory and legal issues

    International Nuclear Information System (INIS)

    Raisler, K.M.; Gregory, A.M.

    1999-01-01

    This chapter focuses on the legal issues relating to the derivatives market in the USA, and analyses the Commodity Futures Trading Commission's (CFTCs) information on swaps and hybrid instruments. The law and regulation in the USA is examined and the jurisdictional reach of the Securities and Exchange Commission (SEC), CFTC, and the Commodity Exchange Act (CEA) is described. The forward contract exclusion and the case of Transnor (Bermuda) Ltd. versus BP North America Petroleum, state laws, swap policy statement issues by the CFTC, the Futures Trading Practices Act of 1992, swaps exemptions, the exemption of hybrid instruments from the CEA, and energy contract exemption are discussed. Enforceability, derivatives, and issues before regulators are considered

  18. U.S. Nuclear Regulatory Commission natural analogue research program

    International Nuclear Information System (INIS)

    Kovach, L.A.; Ott, W.R.

    1995-01-01

    This article describes the natural analogue research program of the U.S. Nuclear Regulatory Commission (US NRC). It contains information on the regulatory context and organizational structure of the high-level radioactive waste research program plan. It also includes information on the conditions and processes constraining selection of natural analogues, describes initiatives of the US NRC, and describes the role of analogues in the licensing process

  19. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1991-04-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  20. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1991-08-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action or has proposed, or is considering action and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  1. Nuclear Regulatory Commission issuances, September 1995. Volume 42, Number 3

    International Nuclear Information System (INIS)

    1995-09-01

    This book contains an issuance of the Atomic Safety and Licensing Board and a Director's Decision, both of the US Nuclear Regulatory Commission. The issuance concerns the dismissal of a case by adopting a settlement reached by the Staff of the Nuclear Regulatory Commission and a Radiation Safety Officer of a hospital in which the safety officer pled guilty to deliberate misconduct. The Director's Decision was to deny a petition to impose a fine on Tennessee Valley Authority concerning alleged harassment of the petitioner and to appoint an independent arbitration board to review all past complaints filed against TVA concerning the Watts Bar Nuclear Plant

  2. Nuclear Regulatory Commission issuances, September 1995. Volume 42, Number 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This book contains an issuance of the Atomic Safety and Licensing Board and a Director`s Decision, both of the US Nuclear Regulatory Commission. The issuance concerns the dismissal of a case by adopting a settlement reached by the Staff of the Nuclear Regulatory Commission and a Radiation Safety Officer of a hospital in which the safety officer pled guilty to deliberate misconduct. The Director`s Decision was to deny a petition to impose a fine on Tennessee Valley Authority concerning alleged harassment of the petitioner and to appoint an independent arbitration board to review all past complaints filed against TVA concerning the Watts Bar Nuclear Plant.

  3. U.S. Nuclear Regulatory Commission bases for control of solid materials

    International Nuclear Information System (INIS)

    Meck, R.A.; Cardille, F.P.; Feldman, C.; Gnugnoli, G.N.; Huffert, A.M.; Klementowicz, S.P.

    2002-01-01

    The U.S. Nuclear Regulatory Commission (NRC) is considering whether to proceed with rulemaking on the control of solid materials with very low levels of associated radioactivity. The current implementation of clearance by NRC licensees is the context for the decision. Inputs to the decision include information gathering efforts of the Commission in the areas of public workshops, dose assessments and inventories, the recommendations of the National Academies' National Research Council (NAs) on regulatory alternatives, and participation in international efforts by the International Atomic Energy Agency (IAEA). (author)

  4. Nuclear Regulatory Commission issuances: August 1994. Volume 40, Number 2

    International Nuclear Information System (INIS)

    1994-08-01

    This report contains the collected issuances of the US Nuclear Regulatory Commission for the month of August, 1994. The report includes issuances of the Commission, the Atomic Safety and Licensing Boards, and the Directors' Decisions. Some of the entities involved include Gulf States Utility company, Sequoyah Fuels Corporation and General Atomics, Georgia Power Company, and Arizona Public Service Company

  5. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1991-10-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  6. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1993-04-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  7. Ratemaking treatment of decommissioning costs by the Federal Energy Regulatory Commission

    International Nuclear Information System (INIS)

    Lenart, R.J.

    1985-01-01

    The Nuclear Regulatory Commission (NRC) has the responsibility for the assurance of funds at the time of decommissioning. The Federal Energy Regulatory Commission (FERC), in conjunction with the State Public Utility Commissions, have the responsibilty to ensure that utilities have just and reasonable rates and an opportunity to collect an appropriate amount of dollars to decommission a nuclear reactor at the conclusion of its service life. Therefore, the Federal Energy Regulatory Commission allows utilities to include nuclear power plant decommissioning costs in rates based on the following ratemaking concepts: (1) that the methodology used by a utility equitably allocates costs between present and future ratepayers who receive service from a nuclear unit; (2) that, given the uncertainty and imprecision that are included in cost estimates for events that will transpire 20-40 years in the future, the FERC chose to err on the low side rather than run the risk of overcharging current customers for future decommissioning expense; and (3) that, as decommissioning experience accumulates, as decommissioning technology improves, and as decommissioning estimates become more refined, utilities would continue to seek revised decommissioning expense allowances from FERC in order to ensure that actual decommissioning costs are recovered over the useful life in which the plant provides service

  8. 78 FR 54502 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2013-09-04

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of a Proposed Rule... Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission (``SEC'' or ``Commission... or manipulative motivation for the trading activity at issue.\\4\\ Specifically, proposed Supplementary...

  9. Review report: safety and reliability issues on digital instrumentation and control systems in nuclear power plants and United States Nuclear Regulatory Commission's dispositions

    International Nuclear Information System (INIS)

    Watanabe, Norio; Suzudo, Tomoaki

    1998-09-01

    Recently, digital instrumentation and control (I and C) systems have been applied to nuclear power plants (NPPs) in various countries. Introduction of digital I and C systems, however, raises special issues on design, implementation, safety and licensing. Since FY 1997, the Japan Atomic Energy Research Institute (JAERI) has been carrying out a project, Study on Reliability of Digital I and C Systems, which includes extensive reviews of design approaches, technical standards, regulatory processes, especially, in the United States. This report summarizes the results from the study of National Research Council (NRC) and the U.S. Nuclear Regulatory Commission's (USNRC's) responses to the recommendations made by the NRC's study. That study identified six technical key issues (system aspects of digital I and C technology, software quality assurance, common-mode software failure potential, safety and reliability assessment methods, human factors and man-machine interface, dedication of commercial off-the-shelf hardware and software) and two strategic key issues (case-by-case licensing process, adequacy of technical infrastructure) that arise from the introduction of digital I and C technology and then, made recommendations to the USNRC for coping with digital I and C applications. The USNRC responded to each recommendation and showed their own dispositions in which the USNRC agreed with most of the recommendations. In Japan, it is expected that introduction of digital I and C technology is inevitable in NPPs because the vendors are gradually discontinuing support and stocking of analog components. To cope with such situations, there is a need to develop and update the standards and guidelines applicable to digital I and C technology. The key issues and the USNRC's dispositions provided in this report is believed to be useful for developing and updating them. (J.P.N.)

  10. United States Nuclear Regulatory Commission information digest: 1997 edition. Volume 9

    International Nuclear Information System (INIS)

    1997-05-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, NRC licensed activities, and general information on domestic and world-wide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1996, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  11. Regulatory requirements for demonstration of the achieved safety level at the Mochovce NPP before commissioning

    International Nuclear Information System (INIS)

    Lipar, M.

    1997-01-01

    A review of regulatory requirements for demonstration of the achieved safety level at the Mochovce NPP before commissioning is given. It contains licensing steps in Slovakia during commissioning; Status and methodology of Mochovce safety analysis report; Mochovce NPP safety enhancement program; Regulatory body policy towards Mochovce NPP safety enhancement; Recent development in Mochovce pre-operational safety enhancement program review and assessment process; Licensing steps in Slovakia during commissioning

  12. The EU commission and national governments as partners: EC regulatory expansion in telecommunications 1979-2000

    OpenAIRE

    Mark Thatcher

    2001-01-01

    Explicitly or implicitly, general models of European integration claim that EC regulatory expansion involves a struggle for power between Commission and national governments. The Commission is seen as a policy entrepreneur, taking the initiative to drive forward integration (Sandholtz and Zysman 1989). It seeks regulatory expansion due to constraints on its expenditure (Majone 1996, ch4). Neo-functionalists emphasise the Commission's ability to expand its role against the wishes of government...

  13. The Spanish energy regulatory body: the national energy commission (CNE)

    International Nuclear Information System (INIS)

    Merono, P. M.

    2002-01-01

    The National Energy Commission (CNE) is the Spanish Energy Regulatory body. This paper presents its scope and purpose, organisation, resources and financing, financial and performance control, functions, and legal provisions. (author)

  14. The U.S. Nuclear Regulatory Commission's antitrust review of nuclear power plants: the conditioning of licenses

    International Nuclear Information System (INIS)

    Penn, D.W.; Delaney, J.B.; Honeycutt, T.C.

    1976-04-01

    The 1970 amendments to Section 105 of the Atomic Energy Act require the Nuclear Regulatory Commission to conduct a prelicensing antitrust review of applications for licenses to construct and operate nuclear power plants. The Commission must make a finding as to whether the granting of a license 'would create or maintain a situation inconsistent with the antitrust laws,' and it has the authority to issue or continue a license, to refuse to issue a license, to rescind or amend a license, and to issue a license with conditions that it deems appropriate. This report provides information about the antitrust license conditions that have resulted from the NRC's antitrust review process. The process itself is described and a catalog of the applications requiring antitrust license conditions is presented. For each application, the license conditions are put into the general categories of unit access, transmission services, coordination, and contractual provisions. For completeness, the report also catalogs applications requiring no antitrust license conditions, and lists applications that were exempted from the 1970 amendments, are the subject of litigation, or have been withdrawn

  15. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

  16. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    International Nuclear Information System (INIS)

    1996-01-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition

  17. 16 CFR 1020.1 - Why is the Commission issuing this rule?

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Why is the Commission issuing this rule... § 1020.1 Why is the Commission issuing this rule? (a) To state the Commission's policies on small... small businesses do not bear a disproportionate share of any burden or cost created by a Commission...

  18. Regulatory policy issues and the Clean Air Act: Issues and papers from the state implementation workshops

    Energy Technology Data Exchange (ETDEWEB)

    Rose, K. [ed.; Burns, R.E.

    1993-07-01

    The National Regulatory Research Institute (NRRI), with funding from the US Environmental Protection Agency (EPA) and the US Department of Energy (DOE), conducted four regional workshops` on state public utility commission implementation of the Clean Air Act Amendments of 1990 (CAAA). The workshops had four objectives: (1) to discuss key issues and concerns on CAAA implementation, (2) to encourage a discussion among states on issues of common interests, (3) to attempt to reach consensus, where possible, on key issues, and (4) to provide the workshop participants with information and materials to assist in developing state rules, orders, and procedures. From the federal perspective, a primary goal was to ensure that workshop participants return to their states with a comprehensive background and understanding of how state commission actions may affect implementation of the CAAA and to be able to provide guidance to their jurisdictional utilities. It was hoped that this would reduce some of the uncertainty utilities face and assist in the development of an efficient allowance market. This report is divided into two main sections. In Section II, eleven principal issues are identified and discussed. These issues were chosen because they were either the most frequently discussed or they were related to the questions asked in response to the speakers` presentations. This section does not cover all the issues relevant to state implementation nor all the issues discussed at the workshops; rather, Section II is intended to provide an overview of the,planning, ratemaking, and multistate issues. Part III is a series of workshop papers presented by some of the speakers. Individual papers have been cataloged separately.

  19. United States nuclear regulatory commission program for inspection of decommissioning nuclear power plants

    International Nuclear Information System (INIS)

    Harris, P.W.

    2001-01-01

    The United States Nuclear Regulatory Commission (USNRC or Commission) has been inspecting decommissioning commercial nuclear power plants in the United States (U.S.) since the first such facility permanently shutdown in September 1967. Decommissioning inspections have principally focused on the safe storage and maintenance of spent reactor fuel; occupational radiation exposure; environmental radiological releases; the dismantlement and decontamination of structures, systems, and components identified to contain or potentially contain licensed radioactive material; and the performance of final radiological survey of the site and remaining structures to support termination of the USNRC-issued operating license. Over the last 5 years, USNRC inspection effort in these areas has been assessed and found to provide reasonable confidence that decommissioning can be conducted safely and in accordance with Commission rules and regulations. Recently, the staff has achieved a better understanding of the risks associated with particular decommissioning accidents 1 and plans to apply these insights to amendments proposed to enhance decommissioning rules and regulations. The probabilities, scenarios, and conclusions resulting from this effort are being assessed as to their applicability to the inspection of decommissioning commercial power reactors. (author)

  20. United States nuclear regulatory commission program for inspection of decommissioning nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Harris, P.W. [U.S. Nuclear Regulatory Commission, Washington, DC (United States)

    2001-07-01

    The United States Nuclear Regulatory Commission (USNRC or Commission) has been inspecting decommissioning commercial nuclear power plants in the United States (U.S.) since the first such facility permanently shutdown in September 1967. Decommissioning inspections have principally focused on the safe storage and maintenance of spent reactor fuel; occupational radiation exposure; environmental radiological releases; the dismantlement and decontamination of structures, systems, and components identified to contain or potentially contain licensed radioactive material; and the performance of final radiological survey of the site and remaining structures to support termination of the USNRC-issued operating license. Over the last 5 years, USNRC inspection effort in these areas has been assessed and found to provide reasonable confidence that decommissioning can be conducted safely and in accordance with Commission rules and regulations. Recently, the staff has achieved a better understanding of the risks associated with particular decommissioning accidents 1 and plans to apply these insights to amendments proposed to enhance decommissioning rules and regulations. The probabilities, scenarios, and conclusions resulting from this effort are being assessed as to their applicability to the inspection of decommissioning commercial power reactors. (author)

  1. US Nuclear Regulatory Commission, 1984 annual report. Volume 1

    International Nuclear Information System (INIS)

    1985-01-01

    This is the 10th annual report of the US Nuclear Regulatory Commission (NRC). This report covers the major activities, events, decisions and planning that took place during fiscal year 1984 (October 1983 through September 1984) within the NRC or involving the NRC. Information is presented concerning 1984 highlights and planning for 1985; reactor regulation; cleanup at Three Mile Island Unit 2; operational experience; nuclear materials; safeguards; waste management; inspection, enforcement, quality assurance, and emergency preparedness; cooperation with the States; international programs; nuclear regulatory research; proceedings and litigation; and management and communication

  2. Indexes to Nuclear Regulatory Commission issuances, January--March 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    This document provides digests and indexes for issuances of the Nuclear Regulatory Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors Decisions, and the Decisions on Petitions for Rulemaking. These indexes and digests are intended to serve as a guide to the issuances.

  3. Indexes to Nuclear Regulatory Commission issuances, January--March 1997

    International Nuclear Information System (INIS)

    1997-01-01

    This document provides digests and indexes for issuances of the Nuclear Regulatory Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors Decisions, and the Decisions on Petitions for Rulemaking. These indexes and digests are intended to serve as a guide to the issuances

  4. Nuclear Regulatory Commission issuances, March 1975

    International Nuclear Information System (INIS)

    1975-04-01

    Reactor licensing actions taken by the Nuclear Regulatory Commission, the Atomic Safety and Licensing Appeal Board and the Atomic Safety and Licensing Boards for March 1975 are presented. Action was included for the following reactors: Big Rock Point Nuclear Plant; West Valley Reprocessing Plant; Limerick Generating Station, Units 1 and 2; Midland Plants, Units 1 and 2; Wolf Creek Generating Station, Unit 1; Monticello Nuclear Generating Plant, Unit 1; Douglas Point Nuclear Generating Station, Units 1 and 2; Seabrook Station, Units 1 and 2; Vermont Yankee Nuclear Power Station; and WPPSS Hanford Units 1 and 4. (U.S.)

  5. 39 CFR Appendix A to Part 3002 - Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Postal Regulatory Commission, Mission Statement of the Office of the Consumer Advocate A Appendix A to Part 3002 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL ORGANIZATION Pt. 3002, App. A Appendix A to Part 3002—Postal Regulatory Commission, Mission Statement of the Office of the Consumer...

  6. Reactor aging research. United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Vassilaros, M.G.

    1998-01-01

    The reactor ageing research activities in USA described, are focused on the research of reactor vessel integrity, including regulatory issues and technical aspects. Current emphasis are described for fracture analysis, embrittlement research, inspection capabilities, validation od annealing rule, revision of regulatory guide

  7. 75 FR 52046 - Development of U.S. Nuclear Regulatory Commission Safety Culture Policy Statement: Public Meeting

    Science.gov (United States)

    2010-08-24

    ... is working towards increasing the attention that is given to safety culture as part of its efforts to... NUCLEAR REGULATORY COMMISSION Development of U.S. Nuclear Regulatory Commission Safety Culture..., Nevada hearing facility to solicit comments on the revision of its draft safety culture policy statement...

  8. 77 FR 9273 - WORKSHOP Sponsored by the Nuclear Regulatory Commission and the Electric Power Research Institute...

    Science.gov (United States)

    2012-02-16

    ... Commission and the Electric Power Research Institute on the Treatment of Probabilistic Risk Assessment.... SUMMARY: The U.S. Nuclear Regulatory Commission (NRC), Office of Nuclear Regulatory Research (RES), in cooperation with the Electric Power Research Institute (EPRI), will hold a joint workshop on the Treatment of...

  9. United States Nuclear Regulatory Commission staff practice and procedure digest

    International Nuclear Information System (INIS)

    1991-02-01

    This Revision 9 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1990 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 9 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through September 30, 1990. This edition of the Digest was prepared by attorneys from Aspen Systems Corporation pursuant to Contract number 18-89-346. Persons using this Digest are placed on notice that it may not be used as an authoritative citation in support of any position before the Commission or any of its adjudicatory tribunals. Persons using this Digest are also placed on notice that it is intended for use only as an initial research tool, that it may, and likely does, contain errors, including errors in analysis and interpretation of decisions, and that the user should not rely on the Digest analyses and interpretations but must read, analyze and rely on the user's own analysis of the actual Commission, Appeal Board and Licensing Board decisions cited. Further, neither the United States, the Nuclear Regulatory Commission, Aspen Systems Corporation, nor any of their employees makes any expressed or implied warranty or assumes liability or responsibility for the accuracy, completeness or usefulness of any material presented in the Digest. The Digest is roughly structured in accordance with the chronological sequence of the nuclear facility licensing process as set forth in Appendix A to 10 CFR Part 2. Those decisions which did not fit into that structure are dealt with in a section on general matters. Where appropriate, particular decisions are indexed under more than one heading. (JF)

  10. US Nuclear Regulatory Commission organization charts and functional statements

    International Nuclear Information System (INIS)

    1997-01-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed

  11. US Nuclear Regulatory Commission organization charts and functional statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This document contains organization charts for the U.S. Nuclear Regulatory Commission (NRC) and for the five offices of the NRC. Function statements are provided delineating the major responsibilities and operations of each office. Organization and function are provided to the branch level. The head of each office, division, and branch is also listed.

  12. Suggested technical scheme to help resolve regulatory issues

    Energy Technology Data Exchange (ETDEWEB)

    Harvey, T.

    1978-07-01

    A management-planning model envisioned as a useful tool for planning and guiding the development of a nuclear waste repository data base is described. It incorporates the technical assessment goals and objectives of the US Nuclear Regulatory Commission, and it provides a strategy for reaching them. The model strategy includes provisions for the breadth, timeliness, and defensibility of its predictions. Consideration is given to observational data, its structure, and future refinements. The structure of the data is consistent with the needs of a systems model whose structure is proposed to resolve questions about repository safety. Uncertainties are categorized as an aid in defining and resolving technical issues. The model provides a framework for ultimately exposing all the sensitive and controversial factors. Some quantitative aspects of data acquisition are presented. 12 figures.

  13. Suggested technical scheme to help resolve regulatory issues

    International Nuclear Information System (INIS)

    Harvey, T.

    1978-07-01

    A management-planning model envisioned as a useful tool for planning and guiding the development of a nuclear waste repository data base is described. It incorporates the technical assessment goals and objectives of the US Nuclear Regulatory Commission, and it provides a strategy for reaching them. The model strategy includes provisions for the breadth, timeliness, and defensibility of its predictions. Consideration is given to observational data, its structure, and future refinements. The structure of the data is consistent with the needs of a systems model whose structure is proposed to resolve questions about repository safety. Uncertainties are categorized as an aid in defining and resolving technical issues. The model provides a framework for ultimately exposing all the sensitive and controversial factors. Some quantitative aspects of data acquisition are presented. 12 figures

  14. Nuclear Regulatory Commission: 1981 annual report

    International Nuclear Information System (INIS)

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  15. Recent regulatory issues in Finland

    International Nuclear Information System (INIS)

    Laaksonen, J.; Tiipana, P.

    2001-01-01

    This paper presents general regulatory issues from Finland since the last WWER Regulators Forum meeting in Odessa 11-13 October 2000. More specific issues concerning Loviisa NPP are described in the Annex of this paper. (author)

  16. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1989-07-01

    This document is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  17. 78 FR 61999 - Hydropower Regulatory Efficiency Act of 2013; Supplemental Notice of Workshop

    Science.gov (United States)

    2013-10-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD13-9-000] Hydropower Regulatory Efficiency Act of 2013; Supplemental Notice of Workshop As announced in the Notices issued on September 3, 2013 and September 18, 2013, the Federal Energy Regulatory Commission (FERC or Commission...

  18. First update to the US Nuclear Regulatory Commission's regulatory strategy for the high-level waste repository program

    International Nuclear Information System (INIS)

    Johnson, R.L.; Linehan, J.J.

    1991-01-01

    The US Nuclear Regulatory Commission (NRC) staff has updated its initial regulatory strategy for the High-Level Waste Repository Licensing Program. The update describes changes to the initial strategy and summarizes progress and future activities. This paper summarizes the first update of the regulatory strategy. In general the overall strategy of identifying and reducing uncertainties is unchanged. Identifying regulatory and institutional uncertainties is essentially complete, and therefore, the current and future emphasis is on reducing those regulatory and institutional uncertainties identified to date. The NRC staff has improved the methods of reducing regulatory uncertainties by (1) enhancing the technical basis preparation process for potential rulemakings and guidance and (2) designing a new guidance document, called a staff position, for clarifying regulatory uncertainties. For guiding the US DOE's reduction of technical uncertainties, the NRC staff will give more emphasis to prelicense application reviews and less emphasis on preparing staff technical positions

  19. Nuclear Regulatory Commission issuances: Volume 39, Number 6

    International Nuclear Information System (INIS)

    1994-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). Issuances of the Nuclear Regulatory Commission include: (1) Advanced Medical Systems, Inc.; (2) Henry Allen, Diane Marrone, and Susan Settino; and (3) Westinghouse Electric Corporation. Issuances of the Atomic Safety and Licensing Boards include: (1) Sequoyah Fuels Corporation and General Atomics Corporation and (2) Umetco Minerals Corporation. Issuances of Director's Decisions include: (1) Advanced Medical Systems, Inc., and (2) Boston Edison Company and all boiling water reactors. The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  20. Nuclear Regulatory Commission staff approaches to improving the integration of regulatory guidance documents and prelicensing reviews

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1994-01-01

    The Nuclear Regulatory Commission staff is conducting numerous activities to improve the integration of its regulatory guidance documents (i.e., License Application Review Plan (LARP) and open-quotes Format and Content for the License Application for the High-Level Waste repositoryclose quotes (FCRG)) and pre-license application (LA) reviews. Those activities related to the regulatory guidance documents consist of: (1) developing an hierarchy of example evaluation findings for LARP; (2) identifying LARP review plan interfaces; (3) conducting an integration review of LARP review strategies; (4) correlating LARP to the ongoing technical program; and (5) revising the FCRG. Some of the more important strategies the staff is using to improve the integration of pre-LA reviews with the LA review include: (1) use of the draft LARP to guide the staff's pre-LA reviews; (2) focus detailed pre-LA reviews on key technical uncertainties; (3) identify and track concerns with DOE's program; and (4) use results of pre-LA reviews in LA reviews. The purpose of this paper is to describe these ongoing activities and strategies and discuss some of the new work that is planned to be included in LARP Revision 1 and the final FCRG, which are scheduled to be issued in late 1994. These activities reflect both the importance the staff has placed on integration and the staff's approach to improving integration in these areas. The staff anticipates that the results of these activities, when incorporated in the FCRG, LARP, and pre-LA reviews, will improve its guidance for DOE's ongoing site characterization program and LA annotated outline development

  1. The Energy Regulatory Commission (1). Law of the Comision Reguladora de Energia

    International Nuclear Information System (INIS)

    1995-01-01

    The Energy Regulatory Commission. Reforms to the Electric Energy Public Service Law (1992) and the Regulatory Law of Article 27 on Petroleum (1995) have brought about fundamental changes in the electric and natural gas industries. The legal reforms explicitly permit the private sector to construct, operate, and own, systems of electric generation and natural gas transportation, storage and distribution. The participation of the private sector in these areas required a redefinition in the government regulatory institutions. Accordingly the Federal Congress enacted the law of the Comision Reguladora de Energia (CRE) in 1995. The CRE law expands the scope of the CRE's authority and the breadth of its powers beyond those established when it was initially created in 1993. The CRE commenced operations in January 1994 as a decentralized technical and consultative body of the Energy Ministry. The decree that created the Commission limited the scope of its authority to an analysis and consultative role applicable only to the electric industry. (Author)

  2. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1 - December 31, 1996. Volume 44, Pages 1 - 432

    International Nuclear Information System (INIS)

    1997-01-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors' Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM

  3. Nuclear Regulatory Commission issuances: Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1--December 31, 1996. Volume 44, Pages 1--432

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. Issuances are referred to as follows: Commission--CLI, Atomic Safety and Licensing Boards--LBP, Administrative Law Judges--ALJ, Directors` Decisions--DD, and Decisions on Petitions for Rulemaking--DPRM.

  4. Regulatory analysis for resolution of USI [Unresolved Safety Issue] A-47

    International Nuclear Information System (INIS)

    Szukiewicz, A.J.

    1989-07-01

    This report presents a summary of the regulatory analysis conducted by the US Nuclear Regulatory Commission staff to evaluate the value/impact of alternatives for the resolution of Unresolved Safety Issue A-47, ''Safety Implications of Control Systems.'' The NRC staff's resolution presented herein is based on these analyses and on the technical findings and conclusions presented in NUREG-1217, the companion document to this report. The staff has concluded that certain actions should be taken to improve safety in light-water reactor plants. The staff recommended that certain plants improve their control systems to preclude reactor vessel/steam generator overfill events and to prevent steam generator dryout, modify their technical specifications to verify operability of such systems, and modify selected emergency procedures to ensure safe shutdown of the plant following a small-break loss-of-coolant accident. This report was issued as a draft for public comment on May 27, 1988. As a result of the public comments received, this report was revised. The NRC staff's responses to and resolution of the public comments are included as Appendix C to the final report, NUREG-1217

  5. NRC Regulatory Agenda

    International Nuclear Information System (INIS)

    1992-07-01

    This document compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rule making which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  6. NRC Regulatory Agenda: Quarterly report, July-September 1987

    International Nuclear Information System (INIS)

    1987-11-01

    The NRC Regulatory agenda is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the commission and are pending disposition by the commission. The regulatory agenda is updated and issued each quarter

  7. NRC regulatory agenda: Quarterly report, April--June 1988

    International Nuclear Information System (INIS)

    1988-08-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  8. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1993-02-01

    This document is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considered action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  9. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1992-11-01

    This document provides a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  10. Nuclear regulatory commission issuances. Volume 40, Number 1

    International Nuclear Information System (INIS)

    1994-07-01

    This report includes issuances concerning the following items. The Commission denies General Atomics' motion seeking to stay discovery in this proceeding until (1) the Commission determines whether it will grant General Atomics' Petition for Review of LBP-94-17 and/or Motion for Directed Certification; and (2) assuming that the commission grants the Petition/Motion, the Commission determines with finality the jurisdictional issues raised in General Atomics' previously filed Motion for Summary Disposition or for an Order of Dismissal. In this proceeding concerning an NRC Staff enforcement order issues in accordance with 10 C.F.R. section 2.202, the Licensing Board concludes that a Native American tribe wishing to participate in the proceeding to support the Staff's enforcement order has established its standing and presented two litigable contentions. This informal adjudicatory proceeding, convened under 10 C.F.R. Part 2, Subpart L, involves an application by the Chemetron Corporation (Licensee) for a license amendment. The proposed amendment concerns the decommissioning of the Licensee's Bert Avenue site in Newburgh Heights, Ohio, and its Harvard Avenue site and associated buildings at the McGean-Rohco property in Cuyahoga Heights, Ohio. In this license suspension and modification enforcement proceeding, the Licensing Board rules on prediscovery dispositive motions regarding ten issues specified by the parties for litigation. The Licensing Board determines that an Intervenor may move to admit into the proceeding a new basis for an already admitted contention. When it does so, the requirements for a late-filed contention are not applicable, but the Intervenor must show that it is timely to consider the new basis, in light of its seriousness and the timelines with which it has been raised. The Licensing Board also permitted Intervenor to file a reply to Applicant's response to his motion to add a new basis to his contention

  11. Why Banning Embedded Sales Commissions Is a Public Policy Issue

    Directory of Open Access Journals (Sweden)

    Henri-Paul Rousseau

    2017-07-01

    Full Text Available Regulatory authorities have consulted on the option of banning embedded sales commissions for Canadian financial advisors. Such an action would create more problems than it would solve. It would have serious ramifications for Canadians’ access to financial advice and raise issues of choice, industry concentration and price transparency for clients seeking advice on investments and retirement. Financial advisors have much greater knowledge of investments than their clients, who rightly expect value from their advisors’ services. Advisors may also face conflicts of interest when they make recommendations about a financial product whose manufacturer might be paying the advisor for selling its products. Banning sales commissions from the manufacturers and having the client pay the advisor directly instead brings its own problems. This is because financial advice is a good with peculiar characteristics. Firstly, financial advice has three fundamental components – the alpha, beta and gamma factors. Together, they define the roles financial advisors play: (alpha asset or portfolio manager, (beta asset allocator (rebalancing a client’s portfolio, and (gamma coach with regard to savings discipline and financial planning. Financial advice has value thanks to the interplay between the three factors. Studies of the issue which have focused on one factor at a time, usually the alpha, produce results that are skewed; however, when studies measure all three factors, the evidence shows that financial advice has significant value, greater than the usual cost charged to clients. Secondly, financial advice is an “experience good”, meaning that clients don’t know ahead of time how good financial advice is until they see how it works out. Assessing the value of financial advice may take many years. Since they can’t immediately measure what they’re paying for, clients with modest incomes or wealth are usually willing only to pay low fees, or not pay

  12. A materials engineering view of license renewal at the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Banic, M.

    1999-01-01

    This paper discusses the treatment of license renewal at the US Nuclear Regulatory Commission (NRC) with emphasis on the review process by the staff of the Materials and Chemical Engineering Branch (EMCB). The paper covers the rules governing license renewal, the applications received, the schedule, the approach, and the technical issues. The NRC has a tight schedule of 30-36 months to renew a license. To date, Baltimore Gas and Electric (BG and E) and Duke Power have applied for license renewal. Expecting more applicants, the staff has taken steps to address the public's concern that the effects of aging will be adequately managed and the industry's concern that the reviews will be timely, efficient, and uniform. These steps include identifying aging effects and making the results available in a report and computerized database, approving topical reports and aging management programs for generic use, and reviewing aging management programs according to specific criteria. Materials Engineering staff have a major role because many of the aging issues are materials related. (author)

  13. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1986

    International Nuclear Information System (INIS)

    1987-05-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during calendar year 1986. Comments and observations are provided on operating experience at nuclear power plants and other NRC licensees, including results from selected AEOD studies; summaries of abnormal occurrences involving US nuclear plants; reviews of licensee event reports and their quality, reactor scram experience from 1984 to 1986, engineered safety features actuations, and the trends and patterns analysis program; and assessments of nonreactor and medical misadministration events. In addition, the report provides the year-end status of all recommendations included in AEOD studies, and listings of all AEOD reports issued from 1980 through 1986

  14. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1987: Nonreactors

    International Nuclear Information System (INIS)

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactor events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD reports issued for 1980-1987

  15. Nuclear Regulatory Commission's antitrust review process: an analysis of the impacts

    International Nuclear Information System (INIS)

    1981-06-01

    The Nuclear Regulatory Commission's (NRC) antitrust process is reviewed and its impacts to small systems and applicant systems are studied. This process takes the form of a description of the NRC's antitrust review process as implemented, a generic categorization of potential impacts and individual case-by-case studies of four different utilities

  16. Problems and experience of regulatory review associated with plant construction and commissioning

    International Nuclear Information System (INIS)

    Commander, W.

    1979-01-01

    The work of the Assessment Branch of NII covering the regulatory review during design safety assessment, construction, commissioning and operation is described commencing with the nuclear licensing procedure through licence variations and conditions attached to the licence, to the final stages of plant construction up to commercial operation and full power production. The importance of the application of safety assessment principles is outlined, the importance of the Safety Inspectorate Schedule described, and the need to retain organisational and regulatory flexibility emphasised. (author)

  17. Regulatory issues for nuclear power plant life management

    International Nuclear Information System (INIS)

    Roe, J.

    2000-01-01

    The workshop of 26-27 june 2000, on nuclear power Plant LIfe Management (PLIM), also included working groups in which major issues facing PLIM activities for nuclear power plants were identified and discussed. The second group was on Regulation. The Regulatory Working Group will attempt to identify some of the more pertinent issues affecting nuclear plant regulation in a changing PLIM environment, to identify some possible actions to be taken to address these issues, and to identify some of the parties responsible for taking these actions. Some preliminary regulatory issues are noted below. This is not intended to be a comprehensive list of such issues but rather is intended to stimulate discussion among the experts attending this Workshop. One of the concerns in the regulatory arena is how the structural integrity of the plants can be assured for an extended lifetime. Technological advances directed toward the following are likely to be important factors in the regulatory process of life extension. - Preventive and corrective maintenance (e.g., water chemistry control, pressure vessel annealing, and replacement of core internals). - Ageing and degradation mechanisms and evaluation (e.g., embrittlement, wear, corrosion/erosion, fatigue, and stress corrosion). - Monitoring, surveillance, and inspection (e.g., fatigue monitoring and non-destructive testing). - Optimisation of maintenance (e.g., using risk-based analysis). On the business side, there is concern about technical support by manufacturers, fuel companies, and construction companies. Maintaining a strong technical base and skilled workers in a potentially declining environment is another concern in the regulatory community. Waste management and decommissioning remain significant issue regarding PLIM. These issues affect all three areas of concern - technology, business, and regulation. It is against this background, that the issues put forth in this paper are presented. The objective of presenting these

  18. NRC [Nuclear Regulatory Commission] staff evaluation of the General Electric Company Nuclear Reactor Study (''Reed Report'')

    International Nuclear Information System (INIS)

    1987-07-01

    In 1975, the General Electric Company (GE) published a Nuclear Reactor Study, also referred to as ''the Reed Report,'' an internal product-improvement study. GE considered the document ''proprietary'' and thus, under the regulations of the Nuclear Regulatory Commission (NRC), exempt from mandatory public disclosure. Nonetheless, members of the NRC staff reviewed the document in 1976 and determined that it did not raise any significant new safety issues. The staff also reached the same conclusion in subsequent reviews. However, in response to recent inquiries about the report, the staff reevaluated the Reed Report from a 1987 perspective. This re-evaluation, documented in this staff report, concluded that: (1) there are no issues raised in the Reed Report that support a need to curtail the operation of any GE boiling water reactor (BWR); (2) there are no new safety issues raised in the Reed Report of which the staff was unaware; and (3) although certain issues addressed by the Reed Report are still being studied by the NRC and the industry, there is no basis for suspending licensing and operation of GE BWR plants while these issues are being resolved

  19. Nuclear Regulatory Commission staff development of the license application review plan for a high-level radioactive waste repository

    International Nuclear Information System (INIS)

    Johnson, R.L.; Holonich, J.J.; Lee, M.P.; Delligatti, M.S.

    1993-01-01

    The Nuclear Regulatory Commission staff has recently started a new initiative to develop the License Application Review Plan (LARP) which the staff will use in its reviews of the U.S. Department of Energy's (DOE's) license application (LA) for a geologic repository for the disposal of high-level radioactive waste (HLW). This paper describes the staff's approach for developing the LARP, the development schedule and current status, the organization and content of the LARP, and the staff's LA review strategy. Therefore, it gives a preview of the draft LARP which will be made available in late 1993. It also describes how the LARP will be used as guidance to the staff in conducting reviews of regulatory and technical issues important to the licensing of a geologic repository. Finally, the benefits to the NRC staff, DOE, and other parties are discussed

  20. Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387

    International Nuclear Information System (INIS)

    1994-01-01

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors' decisions

  1. Nuclear Regulatory Commission issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1994--December 31, 1994. Volume 40, Pages 1--387

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a six-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly softbounds and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition. Cross references in the text and indexes are to the NRCI page numbers which are the same as the page numbers in this publication. This book covers the following: issuances of the NRC; issuances of the Atomic Safety and Licensing Boards; and issuances of Directors` decisions.

  2. Regulatory and technical reports (abstract index journal)

    International Nuclear Information System (INIS)

    1994-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  3. Is woodfuel a strategic issue for the Forestry Commission?

    International Nuclear Information System (INIS)

    Simpson, James

    2000-01-01

    The chapter allows us to answer the question: Is wood fuel a strategic issue for the Forestry Commission? The key points are that: Wood fuel is a strategic issue for the Forestry Commission; Wood fuel is a forest product which can be obtained from both short and long rotation woodlands. Although demand at an industrial scale is relatively low at present there appear to be good prospects for an increase in the near future; The silvicultural systems and forest operations which are employed in the production of wood fuel must be compatible with the UK Forestry Standard and must take account of economic, environmental and social sustainability; The Forestry Commission, as the lead department in GB forestry matters, uses a range of mechanisms in the promotion of sustainable forest management. Many of these are directly applicable to the production of wood fuel; The Forestry Commission's approach to funding research on silvicultural systems and forest operations is based on the identification and removal of barriers which appear to be standing in the way of sustainable forest management. The wood fuel industry could be far more significant to forest management than it is today and this has implications for our research programme. (Author)

  4. NRC regulatory agenda. Seminnual progress report, January 1996--June 1996

    International Nuclear Information System (INIS)

    1996-08-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rule making which have been received by the Commission and are pending disposition by the Commission. The regulatory Agenda is updated and issued semiannually

  5. A compilation of reports of the Advisory Committee on Reactor Safeguards, 1997 annual, U.S. Nuclear Regulatory Commission. Volume 19

    International Nuclear Information System (INIS)

    1998-04-01

    This compilation contains 67 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1997. It also includes a report to the Congress on the NRC Safety Research Program. Specific topics include: (1) advanced reactor designs, (2) emergency core cooling systems, (3) fire protection, (4) generic letters and issues, (5) human factors, (6) instrumentation, control and protection systems, (7) materials engineering, (8) probabilistic risk assessment, (9) regulatory guides and procedures, rules, regulations, and (10) safety research, philosophy, technology and criteria

  6. A compilation of reports of the Advisory Committee on Reactor Safeguards, 1997 annual, U.S. Nuclear Regulatory Commission. Volume 19

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This compilation contains 67 ACRS reports submitted to the Commission, or to the Executive Director for Operations, during calendar year 1997. It also includes a report to the Congress on the NRC Safety Research Program. Specific topics include: (1) advanced reactor designs, (2) emergency core cooling systems, (3) fire protection, (4) generic letters and issues, (5) human factors, (6) instrumentation, control and protection systems, (7) materials engineering, (8) probabilistic risk assessment, (9) regulatory guides and procedures, rules, regulations, and (10) safety research, philosophy, technology and criteria.

  7. The Canadian Nuclear Safety Commission regulatory process for decommissioning a uranium mining facility

    International Nuclear Information System (INIS)

    Scissons, K.; Schryer, D.M.; Goulden, W.; Natomagan, C.

    2002-01-01

    The Canadian Nuclear Safety Commission (CNSC) regulates uranium mining in Canada. The CNSC regulatory process requires that a licence applicant plan for and commit to future decommissioning before irrevocable decisions are made, and throughout the life of a uranium mine. These requirements include conceptual decommissioning plans and the provision of financial assurances to ensure the availability of funds for decommissioning activities. When an application for decommissioning is submitted to the CNSC, an environmental assessment is required prior to initiating the licensing process. A case study is presented for COGEMA Resources Inc. (COGEMA), who is entering the decommissioning phase with the CNSC for the Cluff Lake uranium mine. As part of the licensing process, CNSC multidisciplinary staff assesses the decommissioning plan, associated costs, and the environmental assessment. When the CNSC is satisfied that all of its requirements are met, a decommissioning licence may be issued. (author)

  8. Regulatory analysis for the resolution of Unresolved Safety Issue A-44, Station Blackout. Draft report

    International Nuclear Information System (INIS)

    Rubin, A.M.

    1986-01-01

    ''Station Blackout'' is the complete loss of alternating current (ac) electric power to the essential and nonessential buses in a nuclear power plant; it results when both offsite power and the onsite emergency ac power systems are unavailable. Because many safety systems required for reactor core decay heat removal and containment heat removal depend on ac power, the consequences of a station blackout could be severe. Because of the concern about the frequency of loss of offsite power, the number of failures of emergency diesel generators, and the potentially severe consequences of a loss of all ac power, ''Station Blackout'' was designated as Unresolved Safety Issue (USI) A-44. This report presents the regulatory analysis for USI A-44. It includes: (1) a summary of the issue, (2) the proposed technical resolution, (3) alternative resolutions considered by the Nuclear Regulatory Commission (NRC) staff, (4) an assessment of the benefits and costs of the recommended resolution, (5) the decision rationale, and (6) the relationship between USI A-44 and other NRC programs and requirements

  9. Legal and regulatory issues affecting compressed air energy storage

    Energy Technology Data Exchange (ETDEWEB)

    Hendrickson, P.L.

    1981-07-01

    Several regulatory and legal issues that can potentially affect implementation of a compressed air energy storage (CAES) system are discussed. This technology involves the compression of air using base load electric power for storage in an underground storage medium. The air is subsequently released and allowed to pass through a turbine to generate electricity during periods of peak demand. The storage media considered most feasible are a mined hard rock cavern, a solution-mined cavern in a salt deposit, and a porous geologic formation (normally an aquifer) of suitable structure. The issues are discussed in four categories: regulatory issues common to most CAES facilities regardless of storage medium, regulatory issues applicable to particular CAES reservoir media, issues related to possible liability from CAES operations, and issues related to acquisition of appropriate property rights for CAES implementation. The focus is on selected federal regulation. Lesser attention is given to state and local regulation. (WHK)

  10. The U.S. Nuclear Regulatory Commission's role in the management of radioactive wastes

    International Nuclear Information System (INIS)

    Bernero, R.M.; Kalman, K.L.

    1991-01-01

    This paper discusses the U.S. Nuclear Regulatory Commission's (NRC's) role in the management of radioactive waste. It provides an overview of the NRC's programs for the management of High-Level and Low-Level radioctive wastes and uranium mill tailings. (author) 7 refs

  11. NRC regulatory agenda

    International Nuclear Information System (INIS)

    1993-07-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter. The rules on which final action has been taken since March 31, 1993 are: Repeal of NRC standards of conduct; Fitness-for-duty requirements for licensees who possess, use, or transport Category I material; Training and qualification of nuclear power plant personnel; Monitoring the effectiveness of maintenance at nuclear power plants; Licensing requirements for land disposal of radioactive wastes; and Licensees' announcements of safeguards inspections

  12. Legal, privacy, security, access and regulatory issues in cloud computing

    CSIR Research Space (South Africa)

    Dlodlo, N

    2011-04-01

    Full Text Available a gap on reporting are on are legal , privacy, security, access and regulatory issues. This paper raises an awareness of legal, privacy, security, access and regulatory issues that are associated with the advent of cloud computing. An in...

  13. Report to the US Nuclear Regulatory Commission on analysis and evaluation of operational data - 1987: Power reactors

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactors events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD Reports issued for 1980-1987.

  14. Nuclear Regulatory Commission issuances, January 1997. Volume 45, Number 1

    International Nuclear Information System (INIS)

    1997-01-01

    This book contains issuances of the Atomic Safety and Licensing Board, Nuclear Regulatory Commission and Director's Decision for January 1997. The issuances concern Sequoyah Fuels Corporation and General Atomics Gore, Oklahoma Site decontamination and decommissioning funding; Louisiana Energy Services, Claiborne Enrichment Center denies appeal to review emergency planning; General Public Utilities Nuclear Corporation, Oyster Creek Nuclear Generating station, challenges to technical specifications concerning spent fuel pool; and Consumers Power Company, Palisades Nuclear Plant dry cask storage of spent nuclear fuel

  15. NRC Regulatory Agenda semiannual report, July--December 1995. Volume 14, No. 2

    International Nuclear Information System (INIS)

    1996-02-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued semianually

  16. NRC regulatory agenda: Semiannual report, July--December 1996. Volume 15, Number 2

    International Nuclear Information System (INIS)

    1997-03-01

    The NRC Regulatory Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the Commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued semiannually

  17. Relationship between regulatory issues and probabilistic risk assessments

    International Nuclear Information System (INIS)

    Ilberg, D.; Papazoglou, I.

    1985-01-01

    The objective of this study was to obtain some perspective on the characteristics and the relative number of regulatory issues that are PRA related, i.e., can be effectively addressed by plant specific PRA studies. It was also aimed at developing approaches to resolution of regulatory issues as part of plant specific PRAs. Several ongoing NRC programs include a number of safety-related issues which are applicable to operating plants. A number of these issues include aspects that strongly interact with items addressed in PRA studies. The resolution of several generic issues using PRA studies has already started. A review of over 335 issues included in three NRC programs was conducted: Generic Issue Program (GI); Systematic Evaluation Program (SEP); and TMI Action Plan (TMI). The review identifid 240 items related to PRA, 120 of which were judged to have significant effect on core damage frequency. It is believed that these items can be effectively treated in a PRA study that includes internal and external events

  18. The role of the Nuclear Regulatory Commission in the management of nuclear waste

    International Nuclear Information System (INIS)

    Thompson, H.L. Jr.

    1988-01-01

    In general, the US Nuclear Regulatory Commission (NRC) is responsible for reviewing and making licensing decisions to ensure that the US Department of Energy's (DOE's) high-level waste repository is designed, constructed, and operated without unreasonable risk to public health and safety. In implementing this responsibility, however, the commission's guidance to the staff is that, in the absence of unresolved safety concerns, the NRC regulatory program will not delay the executive branch's program as set forth in the DOE project decision schedule. The NRC role for the next several years will be to develop its licensing framework and to consult with DOE on its plans. An essential ingredient in the success of both NRC's and DOE's respective missions is the need for free and open exchange of information, which will assure us that the concerns of all parties are addressed. With regard to low-level radioactive waste, the states have the lead responsibility for disposal. The NRC also provides assistance to the states and compacts on such items as regulatory programs, site characterization, and mixed waste disposal. Another of the NRC's roles is in the management of uranium mill tailings. Currently, most of the NRC's attention is focused on ensuring adequate long-term stabilization of tailings

  19. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board, and Licensing Board decisions issued from July 1, 1972 through March 31, 1986

    International Nuclear Information System (INIS)

    1986-10-01

    A digest is given of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to March 31, 1986, interpreting the NRC's Rules of Practice. Parts of earlier editions and supplements are replaced, and amendments to the Rules of Practice effective through March 31, 1986 are reflected. The material included deals with applications, prehearing matters, hearings, post-hearing matters, appeals, and decisions related to general matters. Decisions are indexed by facility, citation, CFR, statutes, case law, and other legal citations

  20. 76 FR 5215 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-01-28

    ... . SUPPLEMENTARY INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public... . From this page, the public can gain entry into ADAMS, which provides text and image files of NRC's... [email protected] . The Regulatory Analysis is available electronically under ADAMS Accession...

  1. ENRICH Forum: Ethical aNd Regulatory Issues in Cancer ResearcH

    Science.gov (United States)

    ENRICH Forum: Ethical aNd Regulatory Issues in Cancer ResearcH, designed to stimulate dialogue on ethical and regulatory issues in cancer research and promote awareness of developing policies and best practices.

  2. The U.S. Nuclear Regulatory Commission seismic safety research program

    International Nuclear Information System (INIS)

    Kenneally, R.M.; Guzy, D.J.; Murphy, A.J.

    1988-01-01

    The seismic safety research program sponsored by the U.S. Nuclear Regulatory Commission is directed toward improving the evaluation of potential earthquake effects on nuclear power plant operations. The research has been divided into three major program areas: earth sciences, seismic design margins, and fragilities and response. A major thrust of this research is to assess plant behavior for seismic events more severe and less probable than those considered in design. However, there is also research aimed at improving the evaluation of earthquake input and plant response at plant design levels

  3. Addressing issues raised by stakeholders: evolving practices at the Canadian Nuclear Safety Commission (CNSC)

    International Nuclear Information System (INIS)

    Flavelle, Peter

    2004-01-01

    the CNSC are well coordinated, effectively managed and responsive to the needs of the public, stakeholders and employees. A corporate outreach program is continually evolving to coordinate and improve the effectiveness of CNSC staff interactions with various stakeholder groups. Stakeholder consultation is also undertaken for regulatory amendments, the development of regulatory documents and proposed changes in regulatory programs. A consequence of enhanced accessibility, transparency and openness is the broaching of issues that are of concern to specific stakeholders or are in connection with a specific licensing decision. Frequently, issues that are presented in stakeholder interventions at hearings result in direction to CNSC staff by the Commission tribunal to pursue specific questions or to undertake specific actions. For example, at a recent hearing the issue of communication by a licensee was raised in an intervention by a non-government organization, resulting in the Commission recommending a follow up meeting between the local community stakeholders, CNSC staff and the licensee, leading to changes in the licensee's public information program. Improved openness has also lead to increased stakeholder requests for information on nuclear substance licenses, on the nuclear industry and on regulating the nuclear industry. These requests are received through the CNSC information e-mail account, a toll-free telephone number, and the regular mail. In addition, the CNSC also receives requests for information under Canada's Access to Information Act. The CNSC responds to these requests as efficiently as possible. Stakeholder requests for information are passed to an appropriate CNSC staff member for an electronic or oral response. Interaction with an identifiable staff member contributes to developing confidence in the CNSC as a competent, open and transparent regulator. There are several further examples of CNSC/AECB response to stakeholder issues. At the

  4. VoIP under the EU regulatory framework : preventing foreclosure?

    NARCIS (Netherlands)

    Sadowski, B.M.; Straathof, B.

    2005-01-01

    In June 2004, the European Commission (EC) issued an "Information and Consultation Document" (European Commission 2004) that discussed how the Regulatory Framework of the European Union (EU) should be adapted to accommodate Voice over IP (VoIP) and invited relevant parties to comment on the

  5. System engineering in the Nuclear Regulatory Commission licensing process: Program architecture process and structure

    International Nuclear Information System (INIS)

    Romine, D.T.

    1989-01-01

    In October 1987, the U.S. Nuclear Regulatory Commission (NRC) established the Center for Nuclear Waste Regulatory Analyses at Southwest Research Institute in San Antonio, Texas. The overall mission of the center is to provide a sustained level of high-quality research and technical assistance in support of NRC regulatory responsibilities under the Nuclear Waste Policy Act (NWPA). A key part of that mission is to assist the NRC in the development of the program architecture - the systems approach to regulatory analysis for the NRC high-level waste repository licensing process - and the development and implementation of the computer-based Program Architecture Support System (PASS). This paper describes the concept of program architecture, summarizes the process and basic structure of the PASS relational data base, and describes the applications of the system

  6. 77 FR 76042 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-12-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the Study of Bioethical Issues AGENCY: Department of Health and Human Services, Office of the Assistant..., religion, law, and engineering. The Commission advises the President on bioethical issues arising from...

  7. 76 FR 2425 - Draft Regulatory Guide: Reissuance and Availability

    Science.gov (United States)

    2011-01-13

    ... INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a..., the public can gain entry into ADAMS, which provides text and image files of NRC's public [email protected] . The Regulatory Analysis is available electronically under ADAMS Accession Number...

  8. Organizational behavior of regulatory agencies: a case study of the Bureau of Consumer Services in the Pennsylvania Public Utility Commission

    Energy Technology Data Exchange (ETDEWEB)

    Silver, J.H.

    1981-01-01

    Regulatory agencies operate in a complex field of organizations and interest groups. The variety of behaviors that occur in the regulatory field are not satisfactorily explained by current interpretative frameworks. Regulatory agencies are at once criticized and praised. They flourish as organizational entities, yet they exhibit behavior that is often inexplicable. Notions like clientele capture, the politics of regulation, exchange theory, and institutionalized organizations do not singly explain the vagaries of regulatory behavior. A merger of these viewpoints, however, provides a foundation for a comprehensive interpretative framework. A bureau of consumer services within a state public utility commission is viewed as an institutionalized organization. From this perspective, a variety of ritual behaviors, based upon symbolic and tangible interorganizational exchanges are observed and characterized. The outcome of these exchanges is the establishment of the Bureau of Consumer Services as a legitimate regulatory agent with significant impact upon the formulation of regulatory policy in the formal proceedings of the Pennsylvania Public Utility Commission.

  9. Security issues of new innovative payments and their regulatory challenges

    NARCIS (Netherlands)

    Kasiyanto, Safari; Gabriella, Gimigliano

    2016-01-01

    Kasiyanto discusses how the security issues of M-payments and Bitcoin as new forms of innovative payments challenge the existing EU regulatory frameworks, and whether the proposed regulatory frameworks suffice to address such challenges. The regulatory frameworks Kasiyanto discusses mainly focus on

  10. 75 FR 52533 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2010-08-26

    ... bioethical, legal, and social issues related to potential scientific and technological advances; examine... of public policy with regard to this advancing science. The Commission also will hear more from the... Science, The Presidential Commission for the Study of Bioethical Issues. ACTION: Notice of meeting...

  11. Overall review strategy for the Nuclear Regulatory Commission's High-Level Waste Repository Program

    International Nuclear Information System (INIS)

    Johnson, R.L.

    1994-11-01

    The Overall Review Strategy gives general guidance to the Nuclear Regulatory Commission staff for conducting it's license application and pre-license application reviews. These reviews are in support of the Commission's construction authorization decision for a geologic repository for the disposal of high-level radioactive waste. Objectives and strategies are defined that focus the staff's reviews on determining compliance with requirements of 10 CFR Part 60. These strategies define how the staff prioritizes its reviews on those key technical uncertainties considered to be most important to repository performance. Strategies also give guidance for developing, in an integrated way, the License Application Review Plan together with supporting performance assessments, analyses, and research

  12. Regulatory issues for deep borehole plutonium disposition

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1995-03-01

    As a result of recent changes throughout the world, a substantial inventory of excess separated plutonium is expected to result from dismantlement of US nuclear weapons. The safe and secure management and eventual disposition of this plutonium, and of a similar inventory in Russia, is a high priority. A variety of options (both interim and permanent) are under consideration to manage this material. The permanent solutions can be categorized into two broad groups: direct disposal and utilization. The deep borehole disposition concept involves placing excess plutonium deep into old stable rock formations with little free water present. Issues of concern include the regulatory, statutory and policy status of such a facility, the availability of sites with desirable characteristics and the technologies required for drilling deep holes, characterizing them, emplacing excess plutonium and sealing the holes. This white paper discusses the regulatory issues. Regulatory issues concerning construction, operation and decommissioning of the surface facility do not appear to be controversial, with existing regulations providing adequate coverage. It is in the areas of siting, licensing and long term environmental protection that current regulations may be inappropriate. This is because many current regulations are by intent or by default specific to waste forms, facilities or missions significantly different from deep borehole disposition of excess weapons usable fissile material. It is expected that custom regulations can be evolved in the context of this mission

  13. Nuclear Regulatory Commission Issuances, August 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit No. 1), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Westinghouse Electric Corp. (Export of LEU to the Philippines); Issuances of Atomic Safety and Licensing Appeal Boards--Duke Power Company (Amendment to Materials License SNM-1773--Transportation of Spent Fuel from Oconee Nuclear Station for Storage at McGuire Nuclear Station); Issuances of the Atomic Safety Licensing Boards--Commonwealth Edison Company (Byron Station, Units 1 and 2), Dairyland Power Cooperative (La Crosse Boiling Water Reactor, Operating License and Show Cause), Florida Power and Light Company (St. Lucie Plant, Unit No. 2), Florida Power and Light Company (Turkey Point Nuclear Generating, Units 3 and 4), Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit 1) Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), The Regents of the University of California (UCLA Research Reactor), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3: Terminiation of Proceedings); Issuances of the Directors Denial--Florida Power and Light Company

  14. 75 FR 33853 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-06-15

    .... Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft guide in the... provides text and image files of NRC's public documents. If you do not have access to ADAMS or if there are... ADAMS Accession Number ML100760364. The regulatory analysis is available electronically under ADAMS...

  15. 75 FR 52996 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-30

    .... Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft guide in the... entry into ADAMS, which provides text and image files of NRC's public documents. If you do not have.../ . The regulatory analysis may be found in ADAMS under Accession No. ML102310331. Federal Rulemaking Web...

  16. NRC Regulatory Agenda quarterly report, July--September 1993

    International Nuclear Information System (INIS)

    1993-10-01

    The NRC Regulator Agenda is a compilation of all rules on which the NRC has recently completed action, or has proposed action, or is considering action, and all petitions for rulemaking which have been received by the commission and are pending disposition by the Commission. The Regulatory Agenda is updated and issued each quarter

  17. Pilot program: NRC severe reactor accident incident response training manual: US Nuclear Regulatory Commission response

    International Nuclear Information System (INIS)

    Sakenas, C.A.; McKenna, T.J.; Perkins, K.; Miller, C.W.; Hively, L.M.; Sharpe, R.W.; Giitter, J.G.; Watkins, R.M.

    1987-02-01

    This pilot training manual has been written to fill the need for a general text on NRC response to reactor accidents. The manual is intended to be the foundation for a course for all NRC response personnel. US Nuclear Regulatory Commission Response is the fifth in a series of volumes that collectively summarize the US Nuclear Regulatory Commission (NRC) emergency response during severe power reactor accidents and provide necessary background information. This volume describes NRC response modes, organizations, and official positions; roles of other federal agencies are also described briefly. Each volume serves, respectively, as the text for a course of instruction in a series of courses for NRC response personnel. These materials do not provide guidance or license requirements for NRC licensees. Each volume is accompanied by an appendix of slides that can be used to present this material. The slides are called out in the text

  18. Environmental radioactivity studies and regulatory issues

    International Nuclear Information System (INIS)

    Abalkina, I.L.; Sarkisov, A.A.; Linge, I.I.; Kazakov, S.V.; Panchenko, S.V.; Savelieva, E.A.

    2008-01-01

    During the last decades, Russia has developed regulations applying to the territories affected by radioactive contamination. Some regulatory approaches appear to be quite ineffective and contradictory. This paper shows by means of examples the problems and issues associated with some existing situations. A better way for the future is indicated

  19. Nuclear Regulatory Commission and its role in environmental standards

    International Nuclear Information System (INIS)

    Mattson, R.J.

    1976-01-01

    The NRC and its predecessors in the Atomic Energy Commission represent considerable experience in environmental standards setting. The Atomic Energy Act of 1954, the 1970 Supreme Court decision on Federal pre-emption of radiation standards, the Calvert Cliffs decision of 1971, the Energy Reorganization Act of 1974, and the Appendix I ''as low as reasonably achievable'' decision of 1975, to name a few of our landmarks, are representative of the scars and the achievements of being in a role of national leadership in radiation protection. The NRC, through a variety of legislative authorities, administrative regulations, regulatory guides, and national consensus standards regulates the commercial applications of nuclear energy. The purposes of regulation are the protection of the environment, public health and safety, and national security. To understand NRC's responsibilities relative to those of other Federal and state agencies concerned with environmental protection, we will briefly review the legislative authorities which underlie our regulatory program. Then we will examine the intent or the spirit of that program as embodied in our system of regulations, guides, and standards. Finally we will speak to what's happening today and what we see in the future for environmental standards

  20. Indexes to Nuclear Regulatory Commission Issuances, January--June 1997

    International Nuclear Information System (INIS)

    1997-01-01

    This report indexes the issuances heard and ruled upon from January through June 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Information provided for each case includes the case name, full test reference, issuance number, issues raised by appellants, legal citations, facility name and docket number, subject matter of issues and/or rulings, type of hearing, and type of issuance. Each issuance is displayed in one or more of five separate formats: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index

  1. Indexes to Nuclear Regulatory Commission Issuances, January--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report indexes the issuances heard and ruled upon from January through June 1997. Issuances are from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Information provided for each case includes the case name, full test reference, issuance number, issues raised by appellants, legal citations, facility name and docket number, subject matter of issues and/or rulings, type of hearing, and type of issuance. Each issuance is displayed in one or more of five separate formats: (1) case name index, (2) headers and digests, (3) legal citations index, (4) subject index, and (5) facility index.

  2. Regulatory and technical reports (abstract index journal): Annual compilation for 1987

    International Nuclear Information System (INIS)

    1988-03-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  3. Specific problems and practical experience of regulatory inspection during commissioning in the United Kingdom

    International Nuclear Information System (INIS)

    Lewis, G.

    1977-01-01

    The commissioning of nine Magnox and two Advanced Gas-cooled Reactor Nuclear Power Plants in the United Kingdom during the last sixteen years under the regulatory control of the Nuclear Installations Inspectorate of the Health and Safety Executive has been based on a Stage Approval Philosophy starting with proof-testing of the primary gas circuit and concluding with tests on the reactor at full power. The practical experience gained during this period has enabled the Nuclear Installations Inspectorate to rationalise the procedures and test requirements without comporomising safety standards. The Operating Rules and Maintenance Schedules are approved for commissioning and during this period are reviewed for their adequacy for future power operation of the plant. The organisation, documentation, test procedures and the commissioning programme used for the Advanced Gas-cooled Reactors are briefly explained. (author)

  4. Regulatory issues in merchant transmission investment

    International Nuclear Information System (INIS)

    Brunekreeft, G.

    2005-01-01

    Merchant investment in electricity transmission networks (MTI) is now legally allowed. Predominantly driven by the fear of underinvestment, regulators examine this possibility and given that MTI is a possibility, the regulators face a new set of questions. This paper raises and examines regulatory questions especially from a European institutional framework. The regulatory issues concern the competition effect, the ownership, access regime and the must-offer provision. The paper argues to leave light-handed unregulated MTI light handed and refrain from additional measures. In most cases, it is justified to refrain from sector-specific arrangements because competition,law, if necessary at all, will suffice. However, details matter. (author)

  5. 76 FR 23845 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-04-28

    ... INFORMATION: I. Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a... provides text and image files of the NRC's public documents. If you do not have access to ADAMS or if there...- 800-397-4209, 301-415-4737, or by e-mail to [email protected] . The Regulatory Analysis is...

  6. Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4

    International Nuclear Information System (INIS)

    1995-04-01

    This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director's decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board's order imposing several restrictions on Dr. Bauer; a denial of an Interveners' Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner's petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat

  7. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1992-02-01

    This revision of the sixth edition of the NRC Practice and Procedure Digest contains a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  8. U.S. Nuclear Regulatory Commission fiscal year 1980 supplemental budget request

    International Nuclear Information System (INIS)

    1979-01-01

    The proposed supplemental will enable the Nuclear Regulatory Commission to implement necessary additional effort arising from the agency's assessment of the accident at the Three Mile Island Unit 2 facility on March 28, 1979. The TMI accident has had a major impact on all NRC program areas, in particular on research activities and reactor operations. In addition, funds are requested to enhance the agency's Waste Management program to reflect the recommendations of the President's Interagency Review Group on Waste Management. Specific activities involved in this effort will include developing regulatory guidance, developing a licensing review capability and completing a plan for the site characterization review, all in support of the preparation of NRC guidelines necessary to conduct a construction authorization review. FY 1980 appropriations did not include funds to cover these requirements. A detailed analysis across program lines of the supplemental request is contained in this report

  9. Recommended revisions to Nuclear Regulatory Commission seismic design criteria. Technical report

    International Nuclear Information System (INIS)

    Coats, D.W.

    1980-05-01

    This report recommends changes in the Nuclear Regulatory Commission's (NRC's) criteria now used in the seismic design of nuclear power plants. Areas covered include ground motion, soil-structure interaction, structures, and equipment and components. Members of the Engineering Mechanics Section of the Nuclear Test Engineering Division at Lawrence Livermore Laboratory (LLL) generally agreed upon the recommendations, which are based on (1) reports developed under the NRC's Task Action Plan A-40, (2) other available engineering literature, and (3) recommendations of nationally recognized experts retained by LLL specifically for this task

  10. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  11. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1992-08-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1991, interpreting the NRC's Rules of Pratice in 10 CFR Part 2

  12. United States Nuclear Regulatory Commission Staff practice and procedure digest

    International Nuclear Information System (INIS)

    1990-08-01

    This Revision Number 7 of the fifth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period July 1, 1972 to March 31, 1990, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  13. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1992-05-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  14. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1993-08-01

    This 7th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  15. United States Nuclear Regulatory Commission Staff practice and procedure digest

    International Nuclear Information System (INIS)

    1993-05-01

    This 6th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  16. Indexes to Nuclear Regulatory Commission Issuances, January-March 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors Denials (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility), Full text reference (volume and pagination), Issuance number, Issues raised by appellants, Legal citations (cases, regulations, and statutes), Name of facility, Docket number, Subject matter of issues and/or rulings, Type of hearing (for construction permit, operating license, etc.), and Type of issuance

  17. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors.

  18. Regulatory and technical reports (abstract index journal): Annual compilation for 1996, Volume 21, No. 4

    International Nuclear Information System (INIS)

    Sheehan, M.A.

    1997-04-01

    This compilation is the annual cumulation of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors

  19. 10 CFR Appendix A to Part 73 - U.S. Nuclear Regulatory Commission Offices and Classified Mailing Addresses

    Science.gov (United States)

    2010-01-01

    ... PROTECTION OF PLANTS AND MATERIALS Pt. 73, App. A Appendix A to Part 73—U.S. Nuclear Regulatory Commission..., Louisiana, Montana, Nebraska, Nevada, New Mexico, North Dakota, Oklahoma, Oregon, South Dakota, Texas, Utah...

  20. Recycling of radioactively contaminated materials: Public policy issues

    International Nuclear Information System (INIS)

    Hocking, E.K.

    1994-01-01

    Recycling radioactively contaminated materials requires varying degrees of interaction among Federal regulatory agencies such as the Nuclear Regulatory Commission (NRC) and the Environmental Protection Agency (EPA), State governments and regulators, the public, and the Department of Energy. The actions of any of these parties can elicit reactions from the other parties and will raise issues that must be addressed in order to achieve a coherent policy on recycling. The paper discusses potential actions and reactions of Federal regulatory agencies (defined as NRC and EPA), the States, and the Department and the policy issues they raise

  1. Reactor safety: a discussion by officials of the Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Anders, W.A.; Rusche, B.C.; Stello, V. Jr.; Minogue, R.B.

    1976-01-01

    William A. Anders, Chairman of the Nuclear Regulatory Commission (NRC), and several senior officials spoke to the Joint Committee on Atomic Energy on the subject of nuclear safety, improvements in reactor plant safety, and quality assurance. The NRC, during its first year of organization, has developed new initiatives to improve safety and safeguards regulations. Anders stressed that NRC is not stifling internal discussion of opposing views, that it has been honest with the public, and that operating reactors are meeting rigorous safety standards. Other speakers discussed comparative safety of old and new reactors. Backfitting of older plants with new features is done when substantial safety protection can be added, but detuning an integrated system is not done indiscriminately. Officials of NRC do not agree with former General Electric employees, who testified that the regulatory procedure is inadequate. Safety improvements since August 28, 1962 and outlines of the review process are included in the Appendixes

  2. Regulatory Issues Surrounding Merchant Interconnection

    International Nuclear Information System (INIS)

    Kuijlaars, Kees-Jan; Zwart, Gijsbert

    2003-11-01

    We discussed various issues concerning the regulatory perspective on private investment in interconnectors. One might claim that leaving investment in transmission infrastructure to competing market parties is more efficient than relying on regulated investment only (especially in the case of long (DC) lines connecting previously unconnected parts of the grids, so that externalities from e.g. loop flows do not play a significant role). We considered that some aspects of interconnection might reduce these market benefits. In particular, the large fixed costs of interconnection construction may lead to significant under investment (due to both first mover monopoly power and the fact that part of generation cost efficiencies realised by interconnection are not captured by the investor itself, and remain external to the investment decision). Second, merchant ownership restricts future opportunities for adaptation of regulation, as would be required e.g. for introduction of potentially more sophisticated methods of congestion management or market splitting. Some of the disadvantages of merchant investment may be mitigated however by a suitable regulatory framework, and we discussed some views in this direction. The issues we discussed are not intended to give a complete framework, and detailed regulation will certainly involve many more specific requirements. Areas we did not touch upon include e.g. the treatment of deep connection costs, rules for operation and maintenance of the line, and impact on availability of capacity on other interconnections

  3. Regulatory Issues Surrounding Merchant Interconnection

    Energy Technology Data Exchange (ETDEWEB)

    Kuijlaars, Kees-Jan; Zwart, Gijsbert [Office for Energy Regulation (DTe), The Hague (Netherlands)

    2003-11-01

    We discussed various issues concerning the regulatory perspective on private investment in interconnectors. One might claim that leaving investment in transmission infrastructure to competing market parties is more efficient than relying on regulated investment only (especially in the case of long (DC) lines connecting previously unconnected parts of the grids, so that externalities from e.g. loop flows do not play a significant role). We considered that some aspects of interconnection might reduce these market benefits. In particular, the large fixed costs of interconnection construction may lead to significant under investment (due to both first mover monopoly power and the fact that part of generation cost efficiencies realised by interconnection are not captured by the investor itself, and remain external to the investment decision). Second, merchant ownership restricts future opportunities for adaptation of regulation, as would be required e.g. for introduction of potentially more sophisticated methods of congestion management or market splitting. Some of the disadvantages of merchant investment may be mitigated however by a suitable regulatory framework, and we discussed some views in this direction. The issues we discussed are not intended to give a complete framework, and detailed regulation will certainly involve many more specific requirements. Areas we did not touch upon include e.g. the treatment of deep connection costs, rules for operation and maintenance of the line, and impact on availability of capacity on other interconnections.

  4. Indexes to Commission issuances, October 8, 1956--January 18, 1975

    International Nuclear Information System (INIS)

    1978-05-01

    The document contains digests and indexes for regulatory decisions of the Atomic Energy Commission and its hearing examiners rendered under the Atomic Energy Act of 1954 and published in ATOMIC ENERGY COMMISSION REPORTS, Volumes 1 through 8 covering 1956 through January 1975. Information elements common to the cases heard and ruled upon are (1) case names (owners of facility); (2) name of facility, docket number; (3) type of hearing (for construction permit, operating license, etc.); (4) issues raised by appellants; (5) issuance number; (6) type of issuance (memorandum, order, decision, etc.); (7) issuance pagination; (8) legal citations (cases, regulations, and statutes); and (9) subject matter of issues and/or rulings

  5. Regulatory analyses for severe accident issues: an example

    International Nuclear Information System (INIS)

    Burke, R.P.; Strip, D.R.; Aldrich, D.C.

    1984-09-01

    This report presents the results of an effort to develop a regulatory analysis methodology and presentation format to provide information for regulatory decision-making related to severe accident issues. Insights and conclusions gained from an example analysis are presented. The example analysis draws upon information generated in several previous and current NRC research programs (the Severe Accident Risk Reduction Program (SARRP), Accident Sequence Evaluation Program (ASEP), Value-Impact Handbook, Economic Risk Analyses, and studies of Vented Containment Systems and Alternative Decay Heat Removal Systems) to perform preliminary value-impact analyses on the installation of either a vented containment system or an alternative decay heat removal system at the Peach Bottom No. 2 plant. The results presented in this report are first-cut estimates, and are presented only for illustrative purposes in the context of this document. This study should serve to focus discussion on issues relating to the type of information, the appropriate level of detail, and the presentation format which would make a regulatory analysis most useful in the decisionmaking process

  6. Safety research programs sponsored by Office of Nuclear Regulatory Research

    International Nuclear Information System (INIS)

    Weiss, A.J.; Azarm, A.; Baum, J.W.

    1989-07-01

    This progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the Division of Regulatory Applications, Division of Engineering, Division of Safety Issue Resolution, and Division of Systems Research of the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research following the reorganization in July 1988. The previous reports have covered the period October 1, 1976 through September 30, 1988

  7. Indexes to Nuclear Regulatory Commission issuances, January-March 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full test reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); and Type of issuance (memorandum, order, decision, etc.)

  8. Indexes to Nuclear Regulatory Commission issuances, January--June 1988

    International Nuclear Information System (INIS)

    1988-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administration Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petition of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  9. Nuclear Regulatory Commission issuances, April 1995. Volume 41, Number 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This book contains issuances of the Nuclear Regulatory Commission and of the Atomic Safety and Licensing Boards, and an issuance of the Director`s decision. The issuances concern a petition filed by Dr. James E Bauer seeking interlocutory Commission review of the Atomic Safety and Licensing Board`s order imposing several restrictions on Dr. Bauer; a denial of an Interveners` Petition for Review addressing the application of Babcock and Wilcox for a renewal of its Special Nuclear Materials License; granting a motion for a protective order, by Sequoyah Fuel Corporation and General Atomics, limiting the use of the protected information to those individuals participating in the litigation and for the purposes of the litigation only; granting a Petitioner`s petition for leave to intervene and request for a hearing concerning Georgia Institute of Technology (Georgia Tech Research Reactor) renewal of a facility license; and a denial of a petition filed by Mr. Ted Dougherty requesting a shutdown of the San Onofre Nuclear Generating Station based on concerns regarding the vulnerability of the plant to earthquakes and defensibility of the plant to a terrorist threat.

  10. Regulatory issues in accreditation of toxicology laboratories.

    Science.gov (United States)

    Bissell, Michael G

    2012-09-01

    Clinical toxicology laboratories and forensic toxicology laboratories operate in a highly regulated environment. This article outlines major US legal/regulatory issues and requirements relevant to accreditation of toxicology laboratories (state and local regulations are not covered in any depth). The most fundamental regulatory distinction involves the purposes for which the laboratory operates: clinical versus nonclinical. The applicable regulations and the requirements and options for operations depend most basically on this consideration, with clinical toxicology laboratories being directly subject to federal law including mandated options for accreditation and forensic toxicology laboratories being subject to degrees of voluntary or state government–required accreditation.

  11. Training related research and development conducted at Oak Ridge National Laboratory for the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Haas, P.M.

    1985-01-01

    For a number of years Oak Ridge National Laboratory (ORNL) has conducted a sizeable program of human factors research and development in support of the Office of Nuclear Regulatory Research of the US Nuclear Regulatory Commission (NRC). The history of this effort has in many ways paralleled the growth of human factors R and D throughout the nuclear industry and the program has contributed to advances in the industry as well as to NRC regulatory and research programs. This paper reviews the major projects and products of the program relevant to training and concludes with an identification of future R and D needs

  12. 77 FR 40817 - Low-Level Radioactive Waste Regulatory Management Issues

    Science.gov (United States)

    2012-07-11

    ...-2011-0012] RIN-3150-AI92 Low-Level Radioactive Waste Regulatory Management Issues AGENCY: Nuclear... regulatory time of compliance for a low-level radioactive waste disposal facility, allowing licensees the... system, and revising the NRC's licensing requirements for land disposal of radioactive waste. DATES: The...

  13. Special committee review of the Nuclear Regulatory Commission's severe accident risks report (NUREG--1150)

    International Nuclear Information System (INIS)

    Kouts, H.J.C.; Apostolakis, G.; Kastenberg, W.E.; Birkhofer, E.H.A.; Hoegberg, L.G.; LeSage, L.G.; Rasmussen, N.C.; Teague, H.J.; Taylor, J.J.

    1990-08-01

    In April 1989, the Nuclear Regulatory Commission's (NRC) Office of Nuclear Regulatory Research (RES) published a draft report ''Severe Accident Risks: An Assessment for Five US Nuclear Power Plants,'' NUREG-1150. This report updated, extended and improved upon the information presented in the 1974 ''Reactor Safety Study,'' WASH-1400. Because the information in NUREG-1150 will play a significant role in implementing the NRC's Severe Accident Policy, its quality and credibility are of critical importance. Accordingly, the Commission requested that the RES conduct a peer review of NUREG-1150 to ensure that the methods, safety insights and conclusions presented are appropriate and adequately reflect the current state of knowledge with respect to reactor safety. To this end, RES formed a special committee in June of 1989 under the provisions of the Federal Advisory Committee Act. The Committee, composed of a group of recognized national and international experts in nuclear reactor safety, was charged with preparing a report reflecting their review of NUREG-1150 with respect to the adequacy of the methods, data, analysis and conclusions it set forth. The report which precedes reflects the results of this peer review

  14. U.S. Nuclear Regulatory Commission Process for Risk-Informing the Nuclear Waste Arena

    International Nuclear Information System (INIS)

    Leslie, B. W.

    2003-01-01

    The U.S. Nuclear Regulatory Commission (NRC) is increasing the use of risk insights and information in its regulation of nuclear materials and waste. The objective of this risk-informed regulatory effort is to improve the effectiveness and efficiency of the agency, while maintaining or increasing its focus on safety. The agency's Office of Nuclear Material Safety and Safeguards (NMSS) proposed a five-step process to carry out a framework for increasing the use of risk information and insights in its regulation of nuclear materials and waste. The office is carrying out the five-step process to risk-inform the nuclear materials and waste arenas. NMSS's actions included forming a Risk Task Group and the use of case studies to test and complete screening criteria for identifying candidate regulatory applications amenable for risk-informing. Other actions included involving stakeholders through enhanced public participation, developing safety goals for materials and waste regulatory applications, and establishing a risk training program for staff. Through the case studies, NRC staff found the draft screening criteria to be effective in deciding regulatory areas that may be amenable to an increased use of risk insights. NRC staff also found that risk information may have the potential to reduce regulatory burden and improve staff's efficiency in making decisions, while maintaining safety. Finally, staff found that it would be possible to develop safety goals for the nuclear materials and waste arenas

  15. Overview of Variable Renewable Energy Regulatory Issues: A Clean Energy Regulators Initiative Report

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.; Cox, S.

    2014-05-01

    This CERI report aims to provide an introductory overview of key regulatory issues associated with the deployment of renewable energy -- particularly variable renewable energy (VRE) sources such wind and solar power. The report draws upon the research and experiences from various international contexts, and identifies key ideas that have emerged from the growing body of VRE deployment experience and regulatory knowledge. The report assumes basic familiarity with regulatory concepts, and although it is not written for a technical audience, directs the reader to further reading when available. VRE deployment generates various regulatory issues: substantive, procedural, and public interest issues, and the report aims to provide an empirical and technical grounding for all three types of questions as appropriate.

  16. Nuclear Regulatory Commission Issuances, Volume 42, No. 2

    International Nuclear Information System (INIS)

    1995-08-01

    This report include the issuances received during the specificed period (August 1995) from the NRC, the Atomic Safety and Licensing Boards, the Administrative Law Judges, and the Decisions on Petitions for Rule Making. In these issuances, the following areas were addressed: (1) Emergency planning at the University of Missouri, (2) Transfer of operating license at Plant Vogtle, (3) Discriminatory action against a whistle-blower at Millstone Units 1 ampersand 2, (4) Regulatory issues related to embittlement and cracking at Oyster Creek, and (5) Age-related deterioration of reactor internals components at Pilgrim

  17. Understanding utility regulation : a participants' guide to the British Columbia Utilities Commission

    International Nuclear Information System (INIS)

    1996-10-01

    Information regarding British Columbia's regulated energy industries is presented with particular emphasis on the regulatory functions of the British Columbia Utilities Commission (BCUC). The objective of providing the information is to make the regulatory process as transparent as possible and to make it easy for ratepayers to effectively and economically participate in the regulation of energy utilities. The issue of why electricity and natural gas utilities are regulated is addressed, but the greater part of the report is devoted to describing opportunities for public participation at the BCUC, explaining how to get involved in the Commission's proceedings and the nature of the hearings used by the Commission. An introduction to rate making is also presented, along with an overview of other institutions involved in energy regulation. Appendices contain the text of the Utilities Commission Act (App. A), the Negotiated Settlement Process Policy, Procedures and Guidelines (App. B), Participant Funding and Cost Awards (App. C), and the Integrated Resource Planning Guide (App. D). tabs., figs., 4 appendices

  18. The enforcement program of the nuclear regulatory commission in the United States

    International Nuclear Information System (INIS)

    Thornburg, H.D.

    1977-01-01

    The enforcement program of the United States Nuclear Regulatory Commission consists of a clearly spelled out, evenly applied program of deterrents which escalate according to the nature of the offense and the past history of the licensee's noncompliances. Ninety-eight percent of all enforcement actions are normally handled by the five Regional offices. Only one percent of noncompliances have been classed as violations where significant safety consequences occurred. A strong and timely enforcement program is essential to insure that licensees fulfill their obligations to protect the public and the environment. (Auth.) [fr

  19. Canadian Nuclear Safety Commission's intern program

    International Nuclear Information System (INIS)

    Gilmour, P.E.

    2002-01-01

    The Intern Program was introduced at the Canadian Nuclear Safety Commission, Canada's Nuclear Regulator in response to the current competitive market for engineers and scientists and the CNSC's aging workforce. It is an entry level staff development program designed to recruit and train new engineering and science graduates to eventually regulate Canada's nuclear industry. The program provides meaningful work experience and exposes the interns to the general work activities of the Commission. It also provides them with a broad awareness of the regulatory issues in which the CNSC is involved. The intern program is a two-year program focusing on the operational areas and, more specifically, on the generalist functions of project officers. (author)

  20. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  1. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. 77 FR 26012 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-05-02

    ... ethical issues associated with the development of medical countermeasures for children as well as access... ethical issues associated with the development of medical countermeasures for children, and second, to... Study of Bioethical Issues AGENCY: Presidential Commission for the Study of Bioethical Issues, Office of...

  3. News from the Biological Stain Commission no. 12

    DEFF Research Database (Denmark)

    Lyon, H O

    2012-01-01

    In this 12(th) issue of News from the Biological Stain Commission (BSC) under the heading of Regulatory affairs, the Biological Stain Commission's International Affairs Committee presents information from the meetings of ISO/TC 212/WG 1 Quality and competence in the medical laboratory and ISO....../TC 212/WG 3 In vitro diagnostic products both held on 2 - 3 June 2010, plus information on the second plenary meeting of ISO/TC 212 Clinical laboratory testing and in vitro diagnostic test systems held on 4 June 2010. All meetings took place in Seoul, Republic of Korea. Finally, information is provided...

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission Issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  6. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission Issuance

    International Nuclear Information System (INIS)

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Regulatory framework for radioactive waste disposal in Romania

    International Nuclear Information System (INIS)

    Dogaru, D.M.

    2005-01-01

    To fulfill the obligations assumed by Romania by joining to the international convention and treaty as well as for implementing the European Commission legislative framework a lot of regulations was already issued or are under the development. The National Commission for Nuclear Activities Control as regulatory authority in nuclear field in Romania considered the process of developing regulations in order to detail the requirements for safe management of radioactive waste. (authors)

  16. Regulatory Safety Issues in the Structural Design Criteria of ASME Section III Subsection NH and for Very High Temperatures for VHTR & GEN IV

    Energy Technology Data Exchange (ETDEWEB)

    William J. O’Donnell; Donald S. Griffin

    2007-05-07

    The objective of this task is to identify issues relevant to ASME Section III, Subsection NH [1], and related Code Cases that must be resolved for licensing purposes for VHTGRs (Very High Temperature Gas Reactor concepts such as those of PBMR, Areva, and GA); and to identify the material models, design criteria, and analysis methods that need to be added to the ASME Code to cover the unresolved safety issues. Subsection NH was originally developed to provide structural design criteria and limits for elevated-temperature design of Liquid Metal Fast Breeder Reactor (LMFBR) systems and some gas-cooled systems. The U.S. Nuclear Regulatory Commission (NRC) and its Advisory Committee for Reactor Safeguards (ACRS) reviewed the design limits and procedures in the process of reviewing the Clinch River Breeder Reactor (CRBR) for a construction permit in the late 1970s and early 1980s, and identified issues that needed resolution. In the years since then, the NRC and various contractors have evaluated the applicability of the ASME Code and Code Cases to high-temperature reactor designs such as the VHTGRs, and identified issues that need to be resolved to provide a regulatory basis for licensing. This Report describes: (1) NRC and ACRS safety concerns raised during the licensing process of CRBR , (2) how some of these issues are addressed by the current Subsection NH of the ASME Code; and (3) the material models, design criteria, and analysis methods that need to be added to the ASME Code and Code Cases to cover unresolved regulatory issues for very high temperature service.

  17. A study on the implement of regulatory issue problems about service business

    International Nuclear Information System (INIS)

    Kim, In Hwan; Shim, H. S.; Yoon, K. H.; Jun, I. Y.; Kang, W. S.; Chang, J. H.

    2004-12-01

    This study is intended to derive a proposal for revision of the Atomic Energy Law, with understanding of differences between regulatory requirements and current issues based on findings during safety review and regular inspection. The contents and scope of this study is as follows: - Deep review for service business in 'the rationalization of the radiation protection system related with use of radionuclide', studied by Korea Isotope Association and presentation in the Korea Association for radiation protection, - Efficient regulatory activity through pre-finding of current regulatory issues to be derived during safety review and regular inspection

  18. The United States nuclear regulatory commission license renewal process

    International Nuclear Information System (INIS)

    Holian, B.E.

    2009-01-01

    The United States (U.S.) Nuclear Regulatory Commission (NRC) license renewal process establishes the technical and administrative requirements for the renewal of operating power plant licenses. Reactor ope-rating licenses were originally issued for 40 years and are allowed to be renewed. The review process for license renewal applications (L.R.A.) provides continued assurance that the level of safety provided by an applicant's current licensing basis is maintained for the period of extended operation. The license renewal review focuses on passive, long-lived structures and components of the plant that are subject to the effects of aging. The applicant must demonstrate that programs are in place to manage those aging effects. The review also verifies that analyses based on the current operating term have been evaluated and shown to be valid for the period of extended operation. The NRC has renewed the licenses for 52 reactors at 30 plant sites. Each applicant requested, and was granted, an extension of 20 years. Applications to renew the licenses of 20 additional reactors at 13 plant sites are under review. As license renewal is voluntary, the decision to seek license renewal and the timing of the application is made by the licensee. However, the NRC expects that, over time, essentially all U.S. operating reactors will request license renewal. In 2009, the U.S. has 4 plants that enter their 41. year of ope-ration. The U.S. Nuclear Industry has expressed interest in 'life beyond 60', that is, requesting approval of a second renewal period. U.S. regulations allow for subsequent license renewals. The NRC is working with the U.S. Department of Energy (DOE) on research related to light water reactor sustainability. (author)

  19. Canada's regulatory framework: The Canadian Nuclear Safety Commission's regulatory framework

    International Nuclear Information System (INIS)

    Howard, D.

    2011-01-01

    This paper will discuss the Canadian Nuclear Safety Commission and Canada's Regulatory Framework with respect to Low- and Intermediate-Level Radioactive Waste. The management of low and intermediate level radioactive waste must be ensured in a consistent, environmentally responsible and economical manner throughout its lifecycle -- from its production to the final disposal option. Radioactive waste has been produced in Canada since the early 1930s when the first radium/uranium mine began operating at Port Radium in the Northwest Territories. Pitchblende ore was transported from the Port Radium mine to Port Hope, Ontario where it was refined to produce radium for medical purposes. At present, radioactive waste is generated in Canada from the various stages and uses associated with the nuclear fuel cycle from uranium mining/milling to nuclear reactor operations to radioisotope manufacture and use. The Canadian Nuclear Safety Commission (CNSC regulates the use of nuclear energy and materials to protect the health, safety and security of Canadians and the environment; and to implement Canada's international commitments on the peaceful use of nuclear energy. The CNSC was established in 2000 under the Nuclear Safety and Control Act and reports to Parliament through the Minister of Natural Resources. The CNSC was created to replace the former Atomic Energy Control Board (AECB), which was founded in 1946. Under the Nuclear Safety and Control Act, CNSC's mandate involves four major areas: regulation of the development, production and use of nuclear energy in Canada to protect health, safety and the environment; regulation of the production, possession, use and transport of nuclear substances, and the production, possession and use of prescribed equipment and prescribed information; implementation of measures respecting international control of the development, production, transport and use of nuclear energy and substances, including measures respecting the

  20. 75 FR 66378 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2010-10-28

    ..., and social issues related to potential scientific and technological advances; examine diverse... to formulation of public policy with regard to this advancing science. The Commission also will... third meeting in November. At this meeting, the Commission will continue discussing the emerging science...

  1. 77 FR 61608 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-10-10

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the Study of Bioethical Issues AGENCY: Department of Health and Human Services, Office of the Assistant... leaders in medicine, science, ethics, religion, law, and engineering. The Commission advises [[Page 61609...

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  5. Indexes to Nuclear Regulatory Commission issuances, July-December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (operating license, operating license amendment, etc); Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats: Case Name Index, Headers and Digests, Legal Citations Index, Subject Index, and Facility Index.

  6. Indexes to Nuclear Regulatory Commission issuances, July-December 1997

    International Nuclear Information System (INIS)

    1998-01-01

    Digests and indexes for issuances of the Commission, the Atomic Safety and Licensing Board Panel, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (operating license, operating license amendment, etc); Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats: Case Name Index, Headers and Digests, Legal Citations Index, Subject Index, and Facility Index

  7. Regulatory and technical reports (abstract index journal). Annual compilation for 1984. Volume 9, No. 4

    International Nuclear Information System (INIS)

    1985-01-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  8. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  15. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear regulatory commission issuances

    International Nuclear Information System (INIS)

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Regulatory controls for NORM contamination: Emerging issues and strategies

    International Nuclear Information System (INIS)

    Wennerberg, Linda

    1992-01-01

    Naturally occurring and accelerator-produced radioactive material (NORM) faces the increasing likelihood of federal or state regulatory control. Public concern and limited preliminary survey data fuel the debate over the necessity, approach, and jurisdiction of a NORM regulatory strategy. This debate requires the resolution of technical controversies and potentially competing state and federal agency interests. An additional facet of the debate is the impact of regulation upon traditionally non-nuclear industries, such as oil and gas production. Regulatory response has been initiated in several states, such as Louisiana's controls on equipment used in oil and gas production, to control specific industrial activities which generate NORM. A more comprehensive, generic federal strategy to control NORM contamination is also under review by the Environmental Protection Agency. This paper will detail the emerging technical issues, federal and state regulatory strategies under consideration, and evaluate the efficacy of selected regulatory approaches. (author)

  16. Regulatory framework for radioactive waste disposal in Romania

    International Nuclear Information System (INIS)

    Dogaru, Daniela

    2005-01-01

    Full text: To fulfill the obligations assumed by Romania by joining to the international convention and treaty as well as for implementing the European Commission legislative framework a lot of regulations was already issued or are under the development. The National Commission for Nuclear Activities Control as regulatory authority in nuclear field in Romania considered the process of developing regulations in order to detail the requirements for safe management of radioactive waste. (authors)

  17. Implementation of safety goals in NRC's regulatory process

    International Nuclear Information System (INIS)

    Murley, T.E.

    1985-01-01

    In May 1983 the Nuclear Regulatory Commission issued a policy statement on Safety Goals For Nuclear Power Plant Operation. The Commission at the same time judged that a two-year evaluation period was necessary to judge the effectiveness of the goals and design objectives, and directed the staff to develop information and understanding as to how to further define and use the design objectives and the cost-benefit guidelines. In carrying out the Commission's mandate, the staff framed three major questions to be addressed during the safety goal evaluation period. These three questions are: 1) to what extent is it practical to use safety goals in the regulatory process. 2) Should the quantitative design objectives be modified or supplemented. If so, how. 3) How should the safety goals be implemented at the end of the evaluation period. The staff's conclusions are discussed

  18. Regulatory Safety Issues in the Structural Design Criteria of ASME Section III Subsection NH and for Very High Temperatures for VHTR and GEN IV

    International Nuclear Information System (INIS)

    O'Donnell, William J.; Griffin, Donald S.

    2007-01-01

    The objective of this task is to identify issues relevant to ASME Section III, Subsection NH [1], and related Code Cases that must be resolved for licensing purposes for VHTGRs (Very High Temperature Gas Reactor concepts such as those of PBMR, Areva, and GA); and to identify the material models, design criteria, and analysis methods that need to be added to the ASME Code to cover the unresolved safety issues. Subsection NH was originally developed to provide structural design criteria and limits for elevated-temperature design of Liquid Metal Fast Breeder Reactor (LMFBR) systems and some gas-cooled systems. The U.S. Nuclear Regulatory Commission (NRC) and its Advisory Committee for Reactor Safeguards (ACRS) reviewed the design limits and procedures in the process of reviewing the Clinch River Breeder Reactor (CRBR) for a construction permit in the late 1970s and early 1980s, and identified issues that needed resolution. In the years since then, the NRC and various contractors have evaluated the applicability of the ASME Code and Code Cases to high-temperature reactor designs such as the VHTGRs, and identified issues that need to be resolved to provide a regulatory basis for licensing. This Report describes: (1) NRC and ACRS safety concerns raised during the licensing process of CRBR , (2) how some of these issues are addressed by the current Subsection NH of the ASME Code; and (3) the material models, design criteria, and analysis methods that need to be added to the ASME Code and Code Cases to cover unresolved regulatory issues for very high temperature service.

  19. Yellin's review of the Nuclear Regulatory Commission's Reactor Safety Study: comment

    International Nuclear Information System (INIS)

    Wilson, R.

    1976-01-01

    Joel Yellin (Bell J. Economics, Vol. 7, No. 1 (Spr. 1976)) reviewed the Reactor Safety Study (WASH-1400, or Rasmussen Report) published by the Nuclear Regulatory Commission and makes several criticisms. Wilson finds that some of these criticisms are much overstated, while others, although valid, are mainly criticisms of presentation. To be useful for public policy, reactor risks--and indeed all nuclear risks--must be compared with other risks society faces. Wilson feels that the Rasmussen Report is weak in these comparisons, primarily because there exist few estimates of risk in other places, but that the comparisons he does make indeed confirm that the risk is smaller than Yellin suggests. 20 references

  20. On-farm welfare assessment for regulatory purposes: Issues and possible solutions

    DEFF Research Database (Denmark)

    Sørensen, Jan Tind; Fraser, David

    2010-01-01

    On-farm welfare assessment has been used mainly for non-regulatory purposes such as producer education or to qualify for voluntary welfare-assurance programs. The application of on-farm assessments in regulatory programs would require four issues to be addressed: (1) selecting criteria...... solution. Issues 3 and 4 (fairness and efficiency) require scientific data on the precision, repeatability, independence, and cost-of-scoring for the various candidate criteria. A process is also needed to bring the scientific information into the deliberative process, either as formal recommendations and...

  1. Indexes to Nuclear Regulatory Commission issuances, January--June 1993

    International Nuclear Information System (INIS)

    1993-11-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: (1) Case Name Index; (2) Digests and Headers; (3) Legal Citations Index; (4) Subject Index; (5) Facility Index

  2. Regulatory and technical reports: compilation for 1975-1978

    International Nuclear Information System (INIS)

    1982-04-01

    This brief compilation lists formal reports issued by the US Nuclear Regulatory Commission in 1975 through 1978 that were not listed in the Regulatory and Technical Reports Compilation for 1975 to 1978, NUREG-0304, Vol. 3. This compilation is divided into two sections. The first consists of a sequential listing of all reports in report-number order. The second section consists of an index developed from keywords in report titles and abstracts

  3. United States Nuclear Regulatory Commission Staff practice and procedure digest

    International Nuclear Information System (INIS)

    1991-12-01

    This sixth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1990 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This sixth edition replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1990

  4. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. The official report of the Fukushima Nuclear Accident Independent Investigation Commission

    International Nuclear Information System (INIS)

    2012-07-01

    In October 2011, the Act regarding Fukushima Nuclear Accident Independent Investigation Commission was enacted to investigate the Fukushima accident with the authority to request documents and request the legislative branch to use its investigative powers to obtain any necessary documents or evidence required. In December 2011, chairman and nine other members were appointed. After a six-month investigation, Commission had concluded. 'In order to prevent future disasters, fundamental reforms must take place covering both the structure of electric power industry and the structure of related government and regulatory agencies as well as operation processes, for both normal and emergency situations'. Main parts of report consisted of overview, conclusions and recommendations, and six findings; (1) was the accident preventable?, (2) Escalation of the accident, (3) Emergency response to the accident, (4) Spread of the damage, (5) Organizational issues in accident prevention and response and (6) the legal system. Based on the above findings, Commission made seven recommendations regarding (1) Monitoring of the nuclear regulatory body by the National Diet, (2) Reform the crisis management system, (3) Government responsibility for public health and welfare, (4) Monitoring the operators, (5) Criteria for the new regulatory body, (6) Reforming laws related to nuclear energy and (7) Develop a system of independent investigation commissions. National Diet's thorough debate and deliberate on these recommendation was highly encouraged for the future. (T. Tanaka)

  6. Regulation of Federal radioactive waste activities. Summary of report to Congress on extending the Nuclear Regulatory Commission's licensing or regulatory authority to Federal radioactive waste storage and disposal activities

    International Nuclear Information System (INIS)

    Smith, R.D.

    1979-09-01

    The NRC Authorization Bill for FY 1979 directed NRC to conduct a study of extending the Commission's licensing or regulatory authority to include categories of existing and future Federal radioactive waste storage and disposal activities not presently subject to such authority. The report includes a complete listing and inventory of all radioactive waste storage and disposal activities now being conducted or planned by Federal agencies. The NRC study has attempted to present a general comparison of the relative hazards associated with defense-generated and commercial wastes. Options for extending Commission authority were developed and analyzed. The implications of NEPA were analyzed in the context of these options. The national security implications of extending NRC's regulatory authority over DOE programs are examined and evaluated. Costs and benefits are identified and assessed. The Commission's recommendations, based on the study, are to extend licensing authority over new DOE disposal activities involving transuranic wastes and non-defense low-level waste and to initiate a pilot program to test the feasibility of NRC playing a consultative role in the evaluation of existing DOE activities

  7. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1997, July--September

    International Nuclear Information System (INIS)

    Stevenson, L.L.

    1998-01-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. This report contains the third quarter 1997 abstracts

  8. 76 FR 31997 - Final Memorandum of Understanding Between the U.S. Nuclear Regulatory Commission and the U.S...

    Science.gov (United States)

    2011-06-02

    ... responsibility between the parties, based on their legal authorities, for the security of high-risk chemical.... Nuclear Regulatory Commission and the U.S. Department of Homeland Security on Chemical Facility Anti... INFORMATION CONTACT: R. Clyde Ragland, Project Manager (Security), Fuel Cycle and Transportation Security...

  9. Regulatory and technical reports (Abstract Index Journal). Compilation for third quarter 1985, July-September. Volume 10, No. 3

    International Nuclear Information System (INIS)

    1985-10-01

    This compilation consists of bibliographic data and abstracts for the formal Regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation covers the period from July through September, 1985

  10. The Preliminary Review for the Cross-Cutting Issues in the US Nuclear Regulatory Inspection Framework

    International Nuclear Information System (INIS)

    Lee, Yong Suk; Jung, Dae Wook; Cho, Nam Chul

    2008-01-01

    The research for the development of risk-informed and performance-based regulatory inspection is ongoing in KINS. In the USNRC, the cross-cutting issue is one of the main components the risk-informed and performance-based regulatory inspection process as shown in figure 1, which is named as ROP (Reactor Oversight Process). The following three cross-cutting areas implicitly affect all of the safety cornerstones in ROP. In this study, the preliminary review for the inspection practices of cross-cutting issues in the US and Korean safety regulatory system were performed. The elements of the cross-cutting issues were recently modified to emphasize the importance of safety culture, and the graded approach was applied for the inspection of cross-cutting issues in USNRC. The graded approach for the inspection of cross-cutting issues will be also needed to Korean safety regulatory system in the future

  11. The Preliminary Review for the Cross-Cutting Issues in the US Nuclear Regulatory Inspection Framework

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Yong Suk; Jung, Dae Wook [Future and Challenges Inc., Seoul (Korea, Republic of); Cho, Nam Chul [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2008-10-15

    The research for the development of risk-informed and performance-based regulatory inspection is ongoing in KINS. In the USNRC, the cross-cutting issue is one of the main components the risk-informed and performance-based regulatory inspection process as shown in figure 1, which is named as ROP (Reactor Oversight Process). The following three cross-cutting areas implicitly affect all of the safety cornerstones in ROP. In this study, the preliminary review for the inspection practices of cross-cutting issues in the US and Korean safety regulatory system were performed. The elements of the cross-cutting issues were recently modified to emphasize the importance of safety culture, and the graded approach was applied for the inspection of cross-cutting issues in USNRC. The graded approach for the inspection of cross-cutting issues will be also needed to Korean safety regulatory system in the future.

  12. Status report on NRC's current below regulatory concern activities

    International Nuclear Information System (INIS)

    Dragonette, K.S.

    1988-01-01

    The concept of below regulatory concern (BRC) is not new to the Nuclear Regulatory Commission (NRC) or its predecessor agency, the Atomic Energy Commission. The regulations and licensing decisions have involved limited and de facto decisions on BRC since the beginning. For example, consumer products containing radioactive materials have been approved for distribution to persons exempt from licensing for some time and procedures for survey and release of equipment have traditionally been a part of many licensees' radiation safety programs. However, these actions have generally been ad hoc decisions in response to specific needs and have not been necessarily consistent. The need to deal with this regulatory matter has been receiving attention from both Congress and the NRC Commissioners. NRC response has grown from addressing specific waste streams, to generic rulemaking for wastes, and finally to efforts to develop a broad generic BRC policy. Section 10 of the Low-Level Radioactive Waste Policy Amendments Act of 1985 addressed NRC actions on specific waste streams. In response, NRC issued guidance on rulemaking petitions for specific wastes. NRC also issued an advance notice of proposed rulemaking indicating consideration of Commission initiated regulations to address BRC wastes in a generic manner. The Commissioners have directed staff to develop an umbrella policy for all agency decisions concerning levels of risk or dose that do not require government regulation

  13. Accounting-related transmission issues

    International Nuclear Information System (INIS)

    Niehaus, M.; Bjorn, P.; Pate, G.

    1999-01-01

    Various initiatives have been undertaken by the Federal Energy Regulatory Commission (FERC) to deregulate wholesale electric energy markets. These initiatives have focused on restructuring the transmission systems in the US and recently have culminated in a proposal requiring formation of and participation in regional transmission organizations. The overall form of regulation selected to determine rates for transmission entities as well as underlying regulatory decisions reached on key issues will have profound implications for transmission entities. For example, traditional cost-based regulation would require one set of accounting and reporting rules, while incentive-based regulation may not be subject to those same rules. An overview of some of the major accounting and financial reporting issues that will need to be considered is presented

  14. Indexes to Nuclear Regulatory Commission Issuances, January-June 1981

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); and Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index, Digests and Headers, Legal Citations Index, Subject Index, and Facility Index

  15. Indexes to Nuclear Regulatory Commission Issuances, January--March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, Docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: case name index; digests and headers; legal citations index; subject index; and facility index

  16. Nuclear Regulatory Commission Issuances, September 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Contents include: Issuances of the Nuclear Regulatory Commission--Commonwealth Edison Company (Dresden Nuclear Power Station, Unit 1), Consolidated Edison Company of New York (Indian Point, Unit 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit 1), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Power Authority of the State of New York (Indian Point, Unit 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2); Issuances of Atomic Safety and Licensing Appeal Boards--Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Philadelphia Electric Company, et al. (Peach Bottom Atomic Power Statin, Units 2 and 3), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Statin, Unit No. 2), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2), The Toledo Edison Company, et al. (Davis-Besse Nuclear Power Station, Units 2 and 3); Issuances of the Atomic Safety Licensing Boards--Cleveland Electric Illuminating Company, et al. (Perry Nuclear Power Plant, Units 1 and 2), Commonwealth Edison Company (Dresden Station, Units 2 and 3), Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), Southern California Edison Company, et al. (San Onofre Nuclear Generating Station, Units 2 and 3), Texas Utilities Generating Company, et al. (Comanche Peak Steam Electric Station, Units 1 and 2), Texas Utilities Generating Company, et al

  17. Nuclear Regulatory Commission Issuances, May 81

    International Nuclear Information System (INIS)

    1981-05-01

    Contents: Issuances of the Nuclear Regulatory Commission--Consolidated Edison Company of New York, Inc. (Indian Point, Unit No. 2), Power Authority of the State of New York (Indian Point, No. 3 Nuclear Power Plant), Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 and 2), Statement of Policy on Conduct of Licensing Proceedings, Uranium Mill Licensing Requirements; Issuances of Atomic Safety and Licensing Appeal Boards--Houston Lighting and Power Company, et al. (South Texas Project, Units 1 and 2), Metropolitan Edison Company, et al. (Three Mile Island Nuclear Station, Unit No. 2), Pennsylvania Power and Light Company and Allegheny Electric Cooperative, Inc. (Susquehanna Steam Electric Station, Units 1 and 2), Philadelphia Electric Company et al. (Peach Bottom Atomic Power Station, Units 2 and 3), Public Service Electric and Gas Company (Hope Creek Generating Station, Units 1 and 2); Issuances of the Atomic Safety and Licensing Boards--Duke Power Company (William B. McGuire Nuclear Station, Units 1 and 2), Florida Light and Power Company (Turkey Point Nuclear Generating, Units 3 and 4), Illinois Power Company, et al. (Clinton Power Station, Units 1 and 2), Sacramento Municipal Utility District (Rancho Seco Nuclear Generating Station); Issuances of the Directors Denial--Commonwealth Edison Company (Byron Station, Units 1 and 2), Consolidated Edison Company of New York, Inc. (Indian Point Unit No. 2), Gulf States Utilities Company (River Bend Station Units 1 and 2), Petition to Suspend All Operating Licenses for Pressurized Water Reactors (River Bend Station Units 1 and 2), Portland General Electric Company (Trojan Nuclear

  18. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1990-11-01

    This Revision 8 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 30, 1990 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 8 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through June 30, 1990

  19. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  20. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  1. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  2. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  3. Interim report to the Nuclear Regulatory Commission on radioactive waste classification

    International Nuclear Information System (INIS)

    King, W.C.; Cohen, J.J.

    1977-01-01

    The Lawrence Livermore Laboratory assisted the Nuclear Regulatory Commission in the development of a radioactive waste classification system that will satisfy technical, environmental, and societal concerns. This is an interim report to the NRC on work accomplished to date. It describes a proposed waste-classification system that is based on the final disposition of waste material. The system consists of three classes of radioactive waste. The classification of any radioactive waste will depend primarily on its hazard potential. Other characteristics such as longevity (half-size) will be considered also. The levels of hazard that differentiate the three classes of radioactive waste will be determined by ongoing work. This report describes other work to be completed before a suitable radioactive waste-classificaion system is established

  4. Unresolved safety issues summary. Aqua Book. Volume 6, No. 3

    International Nuclear Information System (INIS)

    Butts, J.

    1984-01-01

    The unresolved safety issues summary is designed to provide the management of the Nuclear Regulatory Commission with a quarterly overview of the progress and plans for completion of generic tasks addressing unresolved safety issues reported to Congress pursuant to Section 210 of the Energy Reorganization Act of 1974 as amended. This summary utilizes data collected from the Office of Nuclear Reactor Regulation, Office of Nuclear Regulatory Research, and the national laboratories and is prepared by the Office of Nuclear Reactor Regulation

  5. Regulation of Federal radioactive waste activities. Report to Congress on extending the Nuclear Regulatory Commission's licensing or regulatory authority to Federal radioactive waste storage and disposal activities

    International Nuclear Information System (INIS)

    1979-09-01

    The report contains two recommendations for extending the Commission's regulatory authority: (1) NRC licensing authority should be extended to cover all new DOE facilities for disposal of transuranic (TRU) waste and nondefense low-level waste. (2) A pilot program, focused on a few specific DOE waste management activities, should be established to test the feasibility of extending NRC regulatory authority on a consultative basis to DOE waste management activities not now covered by NRC's licensing authority or its extension as recommended in Recommendation 1

  6. Animal Health Ireland: providing national leadership and coordination of non-regulatory animal health issues in Ireland.

    Science.gov (United States)

    More, S J; Doherty, M L; Downey, L; McKenzie, K; Devitt, C; O'Flaherty, J

    2011-12-01

    Livestock production plays an important role in the Irish economy. Regulatory animal health issues are the responsibility of government, but until recently there has been no national coordination of non-regulatory animal health issues. This gap has recently been filled with the establishment of Animal Health Ireland (AHI), a not-for-profit, partnership-based organisation providing national leadership and coordination of non-regulatory animal health issues in Ireland. Animal Health Ireland provides benefits to livestock producers and processors by providing the knowledge, education and coordination required to establish effective control strategies, both on-farm and nationally. This paper presents a brief overview of the context for AHI, and of its establishment and initial activities. Non-regulatory animal health issues have been prioritised. A series of work programmes (each focusing on a high-priority issue) have been established. Partnership is critical to success, both for AHI as an organisation and for effective farm-level transfer of knowledge. This model for national leadership and coordination of non-regulatory animal health issues may be of relevance elsewhere.

  7. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    International Nuclear Information System (INIS)

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  8. Regulatory Review of Early Site Permit Applications

    International Nuclear Information System (INIS)

    Scott, Michael L.

    2004-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  9. U.S. NRC's generic issues program

    International Nuclear Information System (INIS)

    Kauffman, J.V.; Foster, J.W.

    2008-01-01

    The United States Nuclear Regulatory Commission (NRC) has a Generic Issues Program (GIP) to address Generic Issues (GI). A GI is defined as 'a regulatory matter involving the design, construction, operation, or decommissioning of several, or a class of, NRC licensees or certificate holders that is not sufficiently addressed by existing rules, guidance, or programs'. This rather legalistic definition has several practical corollaries: First, a GI must involve safety. Second, the issue must involve at least two plants, or it would be a plant-specific issue rather than a GI. Third, the potential safety question must not be covered by existing regulations and guidance (compliance). Thus, the effect of a GI is to potentially change the body of regulations and associated guidance (e.g., regulatory guides). The GIP was started in 1976, thus it is a relatively mature program. Approximately 850 issues have been processed by the program to date. More importantly, even after 30 years, new GIs continue to be proposed. The entire set of Generic Issues (GIs) is updated annually in NUREG-0933, 'A Prioritization of Generic Safety Issues'. GIs normally involve complex questions of safety and regulation. Efficient and effective means of addressing these issues are very important for regulatory effectiveness. If an issue proves to pose a genuine, significant safety question, then swift, effective, enforceable, and cost-effective action needs to be taken. Conversely, if an issue is of little safety significance, the issue should be dismissed in an expeditious manner, avoiding unnecessary expenditure of resources and regulatory burden or uncertainty. This paper provides a summary of the 5-stage program, from identification through the regulatory assessment stage. The paper also includes a discussion of the program's seven criteria, sources of proposed GIs, recent improvements, publicly available information, historical performance, and status of current GIs. (authors)

  10. Methodologies for evaluation of AECB regulatory program

    International Nuclear Information System (INIS)

    Yarranton, G.A.; Gray, B.J.; Yarranton, M.

    1986-05-01

    AECB (Atomic Energy Control Board) commissioned this report to obtain information about methods of planning and conducting evaluation of its regulatory program. The report begins with a bibliography consisting of 280 abstracts assembled from an extensive search of international literature. Each cited publication describes or uses methods applicable to the evaluation of regulatory programs. The report continues with a review of the methodologies found in the literature. It identifies the most relevant references for each step in program evaluation: the commissioning of evaluation; the identification of evaluation issues; the defining of questions; the answering of questions; the reporting of reslts, and the implementation of recommendations. Finally, the report examines the applicability, advantages and disadvantages of the different evaluation methods and makes recommendations about the selection of methods and their application to the AECB program

  11. The use of information systems to transform utilities and regulatory commissions: The application of geographic information systems

    Energy Technology Data Exchange (ETDEWEB)

    Wirick, D.W.; Montgomery, G.E.; Wagman, D.C.; Spiers, J.

    1995-09-01

    One technology that can assist utilities remain financially viable in competitive markets and help utilities and regulators to better serve the public is information technology. Because geography is an important part of an electric, natural gas, telecommunications, or water utility, computer-based Geographic Information Systems (GIS) and related Automated Mapping/Facilities Management systems are emerging as core technologies for managing an ever-expanding variety of formerly manual or paper-based tasks. This report focuses on GIS as an example of the types of information systems that can be used by utilities and regulatory commissions. Chapter 2 provides general information about information systems and effects of information on organizations; Chapter 3 explores the conversion of an organization to an information-based one; Chapters 4 and 5 set out GIS as an example of the use of information technologies to transform the operations of utilities and commissions; Chapter 6 describes the use of GIS and other information systems for organizational reengineering efforts; and Chapter 7 examines the regulatory treatment of information systems.

  12. Telemental Health for Children and Adolescents: An Overview of Legal, Regulatory, and Risk Management Issues.

    Science.gov (United States)

    Kramer, Gregory M; Luxton, David D

    2016-04-01

    The use of technology to provide telemental healthcare continues to increase; however, little has been written about the legal and regulatory issues involved in providing this form of care to children and adolescents. This article reviews existing laws and regulations to summarize the risk management issues relevant to providing telemental healthcare to children and adolescents. There are several legal and regulatory areas in which telemental health clinicians need to have awareness. These areas include: 1) Licensure, 2) malpractice liability, 3) credentialing and privileging, 4) informed consent, 5) security and privacy, and 6) emergency management. Although legal and regulatory challenges remain in providing telemental healthcare to children and adolescents, it is possible to overcome these challenges with knowledge of the issues and appropriate risk management strategies. We provide general knowledge of these key legal and regulatory issues, along with some risk management recommendations.

  13. Regulatory issues with multiplicity in drug approval: Principles and controversies in a changing landscape.

    Science.gov (United States)

    Benda, Norbert; Brandt, Andreas

    2018-01-01

    Recently, new draft guidelines on multiplicity issues in clinical trials have been issued by European Medicine Agency (EMA) and Food and Drug Administration (FDA), respectively. Multiplicity is an issue in clinical trials, if the probability of a false-positive decision is increased by insufficiently accounting for testing multiple hypotheses. We outline the regulatory principles related to multiplicity issues in confirmatory clinical trials intended to support a marketing authorization application in the EU, describe the reasons for an increasing complexity regarding multiple hypotheses testing and discuss the specific multiplicity issues emerging within the regulatory context and being relevant for drug approval.

  14. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  15. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  16. Nuclear Regulatory Commission issuances

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  17. 76 FR 2732 - Self-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Designation of Longer...

    Science.gov (United States)

    2011-01-14

    ...-Regulatory Organizations; The NASDAQ Stock Market LLC; Notice of Designation of Longer Period for Commission.... Introduction On June 18, 2010, The NASDAQ Stock Market LLC (``Nasdaq'' or the ``Exchange'') filed with the... change. The Commission may extend the period for issuing an order approving or disapproving the proposed...

  18. Regulatory issues and assumptions associated with barriers in the vadose zone surrounding buried waste

    International Nuclear Information System (INIS)

    Siskind, B.; Heiser, J.

    1993-02-01

    One of the options for control of contaminant migration from buried waste sites is the construction of a subsurface barrier that consists of a wall of low permeability material. The barrier material should be compatible with soil and waste conditions specific to the site and have as low an effective diffusivity as is reasonably achievable to minimize or inhibit transport of moisture and contaminants. This report addresses the regulatory issues associated with the use of non-traditional organic polymer barriers as well as the use of soil-bentonite or cement-bentonite mixtures for such barriers, considering barriers constructed from these latter materials to be a regulatory baseline. The regulatory issues fall into two categories. The first category consists of issues associated with the acceptability of such barriers to the EPA as a method for achieving site or performanceimprovement. The second category encompasses those regulatory issues concerning health, safety and the environment which must be addressed regarding barrier installation and performance, especially if non-traditional materials are to be used

  19. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-15-000] Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA) \\1\\ and Part 35 of the Federal Energy Regulatory...

  20. 77 FR 33253 - Regulatory Guide 8.24, Revision 2, Health Physics Surveys During Enriched Uranium-235 Processing...

    Science.gov (United States)

    2012-06-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0115] Regulatory Guide 8.24, Revision 2, Health Physics..., ``Health Physics Surveys During Enriched Uranium-235 Processing and Fuel Fabrication'' was issued with a... specifically with the following aspects of an acceptable occupational health physics program that are closely...

  1. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.A.; MI, J.; OERTER, B.; SANDERS, R.; SANDBERG, J.

    2001-01-01

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful

  2. Implications of higher energy - summary of benefits, issues, commissioning cost, SEU, Cryo, QPS margins, Potential availability issues

    CERN Document Server

    Alemany, R

    2012-01-01

    The LHC is technically almost ready to run at 4 TeV per beam in 2012. Nevertheless, a review of the advantages and disadvantages of such an energy step should be carefully made before taking this decision. There fore, this paper will summarize the benefits from the physics point of view; the potential issues like a possible increase of Single Event Errors , Unidentified Flying Objects, or a significant decrease of the quench margin from beam losses that, all in all , could lead to availability issues, compromising the integrated luminosity. And last but not least, the commissioning cost will be addressed.

  3. Major nuclear safety and regulatory issues in Korea

    International Nuclear Information System (INIS)

    Chang, Soon Heung

    2004-01-01

    Recently the value of nuclear energy is being re-considered due to the increase of oil price, the lack of energy supply, and the competition with renewable energy source. In Unites States, Europe, and East Asia, the prospects for continuous nuclear energy development or the policy for retaining nuclear energy have been announced. According to the nuclear energy promotion plan in Korea, there are 19 operating nuclear plants currently and more 7 plants will be constructed in the future. Until now, qualitative as well as quantitative growth is remarkable. Korean nuclear power plants achieved world-best level of capacity factor. However, because of the various nuclear industrial activities, we have a lot of regulatory issues for operating plants, building new plants, and other nuclear related facilities such as research reactors or radioactive waste storage facility. In this article, important regulatory issues which are emerging in Korea will be reviewed and the approaches to solve the issues including public acceptance will be presented. Especially, I will go into detail of two special case studies: The one is the thermal sleeve separation incident in Younggwang nuclear units 5 and 6 whose outage lasts about 80 days and 90 days respectively, which is not common in worldwide nuclear history. The other is about consensus meeting of Korea nuclear energy policy which was managed by a non-governmental organization. (author)

  4. Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually.

  5. Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995

    International Nuclear Information System (INIS)

    1995-09-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually

  6. Nuclear Regulatory Commission issuances

    International Nuclear Information System (INIS)

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  7. Performance-Based (Risk-Informed) Regulation: A Regulatory Perspective

    International Nuclear Information System (INIS)

    Kadambi, N. Prasad

    2005-01-01

    Performance-based regulation (PBR) has been mandated at the national level in the United States and at the agency level, where appropriate, at the U.S. Nuclear Regulatory Commission (USNRC). Guidance has been developed that implements the USNRC's definitions of PBR and other such conceptual regulatory improvements. This paper describes why PBR is important, what constitutes PBR in the context of direction provided at the USNRC, and how PBR can be implemented using a five-step process. The process steps articulate questions to be posed by the analyst regarding various aspects of a regulatory issue so that a suitably performance-based resolution can be developed. A regulatory alternative thus developed can be included among other options to be considered as part of the regulatory decision-making process

  8. Regulatory and technical reports: (Abstract index journal). Compilation for first quarter 1997, January--March

    International Nuclear Information System (INIS)

    Sheehan, M.A.

    1997-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation is published quarterly and cummulated annually. Reports consist of staff-originated reports, NRC-sponsored conference reports, NRC contractor-prepared reports, and international agreement reports

  9. 75 FR 7526 - Withdrawal of Regulatory Guide

    Science.gov (United States)

    2010-02-19

    ...'s Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections . Regulatory guides are... NUCLEAR REGULATORY COMMISSION [NRC-2010-0052] Withdrawal of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Withdrawal of Regulatory Guide 1.56, ``Maintenance of Water Purity in Boiling...

  10. NRC Regulatory Agenda. Quarterly report, July-September 1982

    International Nuclear Information System (INIS)

    1982-10-01

    The Regulatory Agenda is a quarterly compilation of all rules on which the NRC has proposed or is considering action and all petitions for rulemaking which have been received and are pending disposition by the Commission. The agenda consists of two sections. Section I, Rules, includes: (1) rules on which final action has been taken since June 30, the cutoff date of the last Regulatory Agenda; (2) rules published previously as proposed rules and on which the Commission has not taken final action; (3) rules published as advance notices of proposed rulemaking and for which neither a proposed nor final rule has been issued; and (4) unpublished rules on which the NRC expects to take action. Section II, Petitions for Rulemaking, includes: (1) Petitions incorporated into final rules or petitions denied since the cutoff date of the last Regulatory Agenda; (2) Petitions incorporated into proposed rules, (3) Petitions pending staff review; and (4) Petitions with deferred action

  11. Regulatory and technical reports (abstract index journal)

    International Nuclear Information System (INIS)

    1994-03-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission staff and its contractors. There are four types of reports included: staff reports, conference reports, contractor reports, and international agreement reports. In addition to the main citations with abstracts, the following are also included: Secondary report number index; Personal author index; Subject index; NRC originating organization indices for staff reports and international agreement reports; NRC contract sponsor index; Contractor index; International organization index; and Licensed facility index

  12. Regulatory and technical reports compilation for 1980

    International Nuclear Information System (INIS)

    Oliu, W.E.; McKenzi, L.

    1981-04-01

    This compilation lists formal regulatory and technical reports and conference proceedings issued in 1980 by the US Nuclear Regulatory Commission. The compilation is divided into four major sections. The first major section consists of a sequential listing of all NRC reports in report-number order. The second major section of this compilation consists of a key-word index to report titles. The third major section contains an alphabetically arranged listing of contractor report numbers cross-referenced to their corresponding NRC report numbers. Finally, the fourth section is an errata supplement

  13. Materials and design bases issues in ASME Code Case N-47

    International Nuclear Information System (INIS)

    Huddleston, R.L.; Swindeman, R.W.

    1993-04-01

    A preliminary evaluation of the design bases (principally ASME Code Case N-47) was conducted for design and operation of reactors at elevated temperatures where the time-dependent effects of creep, creep-fatigue, and creep ratcheting are significant. Areas where Code rules or regulatory guides may be lacking or inadequate to ensure the operation over the expected life cycles for the next-generation advanced high-temperature reactor systems, with designs to be certified by the US Nuclear Regulatory Commission, have been identified as unresolved issues. Twenty-two unresolved issues were identified and brief scoping plans developed for resolving these issues

  14. 75 FR 48382 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-10

    .... Introduction The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment a draft guide in the... provides text and image files of NRC's public documents. If you do not have access to ADAMS or if there are... analysis may be found in ADAMS under Accession No. ML101740327. Federal Rulemaking Web site: Public...

  15. Regulatory issues in the maintenance of Argentine nuclear power plants

    International Nuclear Information System (INIS)

    Castro, E.; Caruso, G.

    1997-01-01

    The influence of maintenance activities upon nuclear safety and their relevance as means to detect and prevent aging make them play an outstanding role among the fields of interest of the Argentine nuclear regulatory body (ENREN). Such interest is reinforced by the fact that the data obtained during maintenance are used - among other - as inputs in the Probabilistic Safety Analyses required for those nuclear power plants. This paper provides a brief description of the original requirements by the regulatory body concerning maintenance, of the factors that led to review the criteria involved in such requirements and of the key items identified during the reviewing process. The latter shall be taken into account in the maintenance regulatory policy, for the consequent issue of new requirements from the utilities and for the eventual publication of a specific regulatory standard. (author)

  16. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992

    International Nuclear Information System (INIS)

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  17. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991

    International Nuclear Information System (INIS)

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2

  18. Proceedings of the specialists' meeting on regulatory inspection practices in nuclear power plants

    International Nuclear Information System (INIS)

    1977-01-01

    The sessions and contributions of this conference are dealing with: the general problems of regulatory inspection of nuclear power plants and overall national practices (in Canada, France, Germany, Italy, Spain, the United States), specific problems and practical experience of regulatory inspection during site study, evaluation, design, manufacturing and construction of nuclear plants (in Finland, Germany, Spain, Sweden, Great-Britain, United States), quality insurance issues, pressure component regulations, specific problems and practical experience of regulatory inspection during commissioning (in Spain, Sweden, Great-Britain and United States), specific problems and practical experience of regulatory inspection during operation (in Spain, Great-Britain, Unites States, Italy and Sweden), special aspects of regulatory inspection (notably public information issues in Sweden and in Great-Britain, inspection of nuclear fuel transportation in Spain, enforcement programme in the USA)

  19. Licensing issues

    International Nuclear Information System (INIS)

    Roberts, J.P.; Desell, L.J.; Birch, M.L.; Berkowitz, L.; Bader, J.F.

    1992-01-01

    To provide guidance for the Department of Energy's (DOE) Civilian Radioactive Waste Management Program, the Nuclear Regulatory Commission (NRC) has issued a draft regulatory guide on the Format and Content for the License Application for the High-Level Waste Repository (FCRG). To facilitate the development of the FCRG, NRC suggested that DOE use the draft guide as the basis for preparing an annotated outline for a license application. DOE is doing so using an iterative process called the Annotated Outline Initiative. DOE;s use of the Initiative will assist in achieving the desired incorporation of actual experience in the FCRG, contribute to the development of shared interpretation and understanding of NRC regulations, and provide other important programmatic benefits described in this paper

  20. PRA research and the development of risk-informed regulation at the U.S. nuclear regulatory commission

    International Nuclear Information System (INIS)

    Siu, Nathan; Collins, Dorothy

    2008-01-01

    Over the years, Probabilistic Risk Assessment (PRA) research activities conducted at the U.S. Nuclear Regulatory Commission (NRC) have played an essential role in support of the agency's move towards risk-informed regulation. These research activities have provided the technical basis for NRC's regulatory activities in key areas; provided PRA methods, tools, and data enabling the agency to meet future challenges; supported the implementation of NRC's 1995 PRA Policy Statement by assessing key sources of risk; and supported the development of necessary technical and human resources supporting NRC's risk-informed activities. PRA research aimed at improving the NRC's understanding of risk can positively affect the agency's regulatory activities, as evidenced by three case studies involving research on fire PRA, Human Reliability Analysis (HRA), and Pressurized Thermal Shock (PTS) PRA. These case studies also show that such research can take a considerable amount of time, and that the incorporation of research results into regulatory practice can take even longer. The need for sustained effort and appropriate lead time is an important consideration in the development of a PRA research program aimed at helping the agency address key sources of risk for current and potential future facilities

  1. 76 FR 24539 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2011-05-02

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . Electronic copies... NUCLEAR REGULATORY COMMISSION [NRC-2010-0181] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide...

  2. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to help facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.

  3. Regulatory practices - United States example

    International Nuclear Information System (INIS)

    Shapar, M.

    1976-01-01

    In 1954, the Atomic Energy Act of 1946 was revised to do away with the federal state monopoly in this field and to enable private industry to develop nuclear power. This evolution led the federal authorities to give the Atomic Energy Commission the powers to control the design, licensing and operation of nuclear reactors. These powers were constantly strengthened and are now exercised by the Nuclear Regulatory Commission (NRC). Since its creation in 1975, the Commission has amended the regulations on licensing of nuclear reactors in the light of experience acquired so as to shorten the duration of this procedure. These amendments concern the standardization of nuclear power plants, limited work authorizations, the methods for issuing licenses. The objective of the Commission aim to make the licensing procedure for nuclear power plants simpler and more efficient and hence, less costly, while ensuring that a very high level for safety standards and environmental protection is maintained. (NEA) [fr

  4. A study on the regulatory approach of major technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Keun Sun; Choi, J. T.; Kim, I. J. [Sunmoon Univ., Asan (Korea, Republic of); Lee, S. H.; Baek, W. P.; Yang, S. H. [Korea Association for Nuclear Technology, Taejon (Korea, Republic of)

    1998-06-15

    This project is to provide the regulatory direction of 4 major technical issues for the Korean Next Generation Reactors, which are parts of major technical issues resulted from the safety regulation R and D on the KNGR. The outstanding results are as follows : reliability of risk significant SSCs established during design stage must be maintained through the operating life of the plant, currently used classification method of plant conditions and safety requirement were reviewed, and a quantitative classification method is needed to be developed further, the basic regulatory directions are proposed for multiple failures such as SBO, TLOFW, multiple SGTR and ATWS, safety requirements are proposed for survivability/availability of severe accident mitigation design features by 5 items if basic requirements, selection of initial event, identification of available equipment and instruments, identification of environmental conditions and verification methods.

  5. 75 FR 42170 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-07-20

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0425] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide...

  6. 75 FR 48381 - Final Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-08-10

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0274] Final Regulatory Guide: Issuance, Availability AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance and availability of Regulatory Guide...

  7. Regulatory issues of digital instrumentation and control system in Lungmen project

    International Nuclear Information System (INIS)

    Chuang, C.F.; Chou, H.P.

    2004-01-01

    The Lungmen Nuclear Power Station (LNPS) is currently under construction in Taiwan, which consists of 2 advanced boiling water reactor (ABWR) units. The instrumentation and control (IC) systems of the LNPS are based on the state-of-the-art modernized fully integrated digital design. These IC systems possess many advantages and distinguished features comparing to traditional analog IC systems, they enjoy set-point stability, self-diagnostic and automatic testing ability, fault tolerance and avoidance, low power requirements, data handling and storage capability, as well as enhanced human-machine interfaces. This paper presents regulatory overviews, regulatory requirements, current major regulatory issues, as well as the areas of regulatory concerns and the lessons learned on the digital IC systems in the Lungmen Project

  8. Advanced alarm systems: Display and processing issues

    Energy Technology Data Exchange (ETDEWEB)

    O`Hara, J.M. [Brookhaven National Lab., Upton, NY (United States); Wachtel, J.; Perensky, J. [US Nuclear Regulatory Commission, Washington, DC (United States). Office of Nuclear Regulatory Research

    1995-05-01

    This paper describes a research program sponsored by the US Nuclear Regulatory Commission to address the human factors engineering (HFE) deficiencies associated with nuclear power plant alarm systems. The overall objective of the study is to develop HFE review guidance for alarm systems. In support of this objective, human performance issues needing additional research were identified. Among the important issues were alarm processing strategies and alarm display techniques. This paper will discuss these issues and briefly describe our current research plan to address them.

  9. Japan's regulatory and safety issues regarding nuclear materials transport

    International Nuclear Information System (INIS)

    Saito, T.; Yamanaka, T.

    2004-01-01

    This paper focuses on the regulatory and safety issues on nuclear materials transport which the Government of Japan (GOJ) faces and needs to well handle. Background information about the status of nuclear power plants (NPP) and nuclear fuel cycle (NFC) facilities in Japan will promote a better understanding of what this paper addresses

  10. Court-agency interaction in environmental policymaking: the cases of the Nuclear Regulatory Commission and the Environmental Protection Agency

    International Nuclear Information System (INIS)

    Thomas, L.W.

    1981-01-01

    This study examines the increasingly active participation of courts in the administrative process as well as agency responses to court-imposed policy shifts. More specifically, it is an investigation of the interaction between the federal courts, primarily the Supreme Court and the District of Columbia Court of Appeals, and two federal regulatory agencies, the Nuclar Regulatory Commission and the Environmental Protection Agency. There are five objectives to the study. The first is to examine the natura of court-agency interaction and to determine the extent to which patterns of judicial review of administrative actions can be discerned. The second is to examine the effect of court orders on agency programs and policies. The third is to assess the anticipatory dimension of court-agency relations. The fourth is to inquire into the recurring dimension of court-agency interaction and to determine its effect on subsequent court decisions. The last is to assess the institutional capacity of courts to deal with scientific and technological issues. This study indicates that judicial review has a substantial effect on the NRC's and the EPA's decision-making activities. Few, if any, recent major policy decisions of the two agencies have not been scrutinized closely by federal appellate courts. During the past decade, the courts have blocked policy initiative on numerous occasions and have been the primary source of change in others. In addition, the mere anticipation of judicial review was found to be a factor motivating the two agencies to make reasoned decisions

  11. 10 CFR Appendix A to Part 5 - List of Federal Financial Assistance Administered by the Nuclear Regulatory Commission to Which...

    Science.gov (United States)

    2010-01-01

    ... COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL... regulatory programs and related matters at NRC facilities and offices, or other locations. (b) Orientations... recovery, to receive orientation and on-the-job instruction at NRC facilities and offices, or other...

  12. Introduction of the U.S. Nuclear Regulatory Commission's Activities to Reflect Lessons Learned from Fukushima Nuclear Accident

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jongtae; Hong, Seong-Wan [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Gun Hong [Kyungwon E-C Co., Seongnam (Korea, Republic of)

    2014-10-15

    The Charter requires the staff to highlight potential policy issues for the Commission and provide the Commission every 6 months an update on the review work conducted under the Charter. The recent status of NRC's activities and related program to reflect the lesson-learned from the Fukushima Daiichi nuclear power plant's severe accident are introduced in this paper. A wide variety of the U.S. NRC's activities to reflect lessons learned from the Fukushima nuclear accidents was investigated. From the investigation, it was found that most of NRC's activities, based on the Fukushima Near-Term Task Force (NTTF) recommendations, are being implemented in a comprehensive and systematic manner. The NRC staff initially prioritized the NTTF recommendations based on its judgment of the potential and relative safety enhancement which could be realized by each. As a result of the staff's prioritization and assessment process, the NTTF recommendations were prioritized into three tiers (i.e., Tier 1, 2 and 3). Tier 1 recommendations are which the staff determined should be started without unnecessary delay and for which sufficient resource flexibility, including availability of critical skill sets, exists. Tier 2 recommendations are which could not be initiated in the near term due to factors that include the need for further technical assessment and alignment, dependence on Tier 1 issues, or availability of critical skill sets. Tier 3 recommendations are that require further staff study to support a regulatory action, have an associated shorter term action that needs to be completed to inform the longer-term action, are dependent on the availability of critical skill sets, or are dependent on the resolution of NTTF Recommendation 1. Through the implementation of each tier activities, existing layers of defense in depth are expected to be gradually bolstered, and such a regulatory approach is much similar in the other countries. It was also found that

  13. Introduction of the U.S. Nuclear Regulatory Commission's Activities to Reflect Lessons Learned from Fukushima Nuclear Accident

    International Nuclear Information System (INIS)

    Kim, Jongtae; Hong, Seong-Wan; Kim, Gun Hong

    2014-01-01

    The Charter requires the staff to highlight potential policy issues for the Commission and provide the Commission every 6 months an update on the review work conducted under the Charter. The recent status of NRC's activities and related program to reflect the lesson-learned from the Fukushima Daiichi nuclear power plant's severe accident are introduced in this paper. A wide variety of the U.S. NRC's activities to reflect lessons learned from the Fukushima nuclear accidents was investigated. From the investigation, it was found that most of NRC's activities, based on the Fukushima Near-Term Task Force (NTTF) recommendations, are being implemented in a comprehensive and systematic manner. The NRC staff initially prioritized the NTTF recommendations based on its judgment of the potential and relative safety enhancement which could be realized by each. As a result of the staff's prioritization and assessment process, the NTTF recommendations were prioritized into three tiers (i.e., Tier 1, 2 and 3). Tier 1 recommendations are which the staff determined should be started without unnecessary delay and for which sufficient resource flexibility, including availability of critical skill sets, exists. Tier 2 recommendations are which could not be initiated in the near term due to factors that include the need for further technical assessment and alignment, dependence on Tier 1 issues, or availability of critical skill sets. Tier 3 recommendations are that require further staff study to support a regulatory action, have an associated shorter term action that needs to be completed to inform the longer-term action, are dependent on the availability of critical skill sets, or are dependent on the resolution of NTTF Recommendation 1. Through the implementation of each tier activities, existing layers of defense in depth are expected to be gradually bolstered, and such a regulatory approach is much similar in the other countries. It was also found that

  14. Radioactive waste below regulatory concern

    International Nuclear Information System (INIS)

    Neuder, S.M.

    1987-01-01

    The U.S. Nuclear Regulatory Commission (NRC) published two notices in the Federal Register concerning radioactive waste below regulatory concern. The first, a Commission Policy Statement and Implementation Plan published August 29, 1986, concerns petition to exempt specific radioactive waste streams from the regulations. The second, an Advanced Notice of Proposed Rulemaking published Decemger 2, 1986, addresses the concept of generic rulemaking by the NRC on radioactive wastes that are below regulatory concern. Radioactive waste determined to be below regulatory concern would not be subject to regulatory control and would not need to go to a licensed low-level radioactive waste disposal site. The Policy Statement and Implementation Plan describe (1) the information a petitioner should file in support of a petition to exempt a specific waste stream, (2) the decision criteria the Commission intends to use for judging the petition, and (3) the internal administrative procedures to use be followed in order to permit the Commission to act upon the petition in an expedited manner

  15. Safety research programs sponsored by Office of Nuclear Regulatory Research: Progress report, January 1--June 30, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Baum, J W; Boccio, J L; Diamond, D; Fitzpatrick, R; Ginsberg, T; Greene, G A; Guppy, J G; Hall, R E; Higgins, J C; Weiss, A J [comp.

    1988-12-01

    This progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the Division of Regulatory Applications, Division of Engineering, Division of Safety Issue Resolution, and Division of Systems Research of the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research following the reorganization in July 1988. The previous reports have covered the period October 1, 1976 through December 31, 1987.

  16. Safety research programs sponsored by Office of Nuclear Regulatory Research: Progress report, October 1--December 31, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, A J; Azarm, A; Baum, J W; Boccio, J L; Carew, J; Diamond, D J; Fitzpatrick, R; Ginsberg, T; Greene, G A; Guppy, J G; Haber, S B

    1989-07-01

    This progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the Division of Regulatory Applications, Division of Engineering, Division of Safety Issue Resolution, and Division of Systems Research of the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research following the reorganization in July 1988. The previous reports have covered the period October 1, 1976 through September 30, 1988.

  17. Safety research programs sponsored by Office of Nuclear Regulatory Research: Progress report, January 1--June 30, 1988

    International Nuclear Information System (INIS)

    Baum, J.W.; Boccio, J.L.; Diamond, D.

    1988-12-01

    This progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the Division of Regulatory Applications, Division of Engineering, Division of Safety Issue Resolution, and Division of Systems Research of the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research following the reorganization in July 1988. The previous reports have covered the period October 1, 1976 through December 31, 1987

  18. U.S. regulatory initiatives related to nuclear research and development

    International Nuclear Information System (INIS)

    Carr, K.M.

    1987-01-01

    U.S. Nuclear Regulatory Commission is working to improve its 'early warning system' in order to recognize trends and identify potential safety problems whether the source of the problems relates to a reactor safety system or to a utility management or organizational issue. The Commission has approved the use of performance indicators to provide a more effective means for top NRC management and the Commission to recognize changes in the safety performance of operating reactors. Research also has a leading role in assuring the safety of the evolving nuclear technology. The primary role of NRC's program is to provide a sound technical basis for decisions on the resolution of safety issues for the current generation of plants and safety issues that may arise for future designs. Topical areas essential to resolve the remaining safety issues or uncertainties related to LWR operation are human factors and accident management, life extension and plant aging, studies on containment integrity, severe accident risk analysis and uncertainty resolution, reliability engineering and the analysis of thermal-hydraulic transients. (Nogami, K.)

  19. U.S. Department of Energy & Nuclear Regulatory Commission Advanced Fuel Cycle Research & Development Seminar Series FY 2007 & 2008

    Energy Technology Data Exchange (ETDEWEB)

    Grandy, Christopher [Argonne National Lab. (ANL), Argonne, IL (United States)

    2008-08-01

    In fiscal year 2007, the Advanced Burner Reactor project initiated an educational seminar series for the Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) personnel on various aspects of fast reactor fuel cycle closure technologies. This important work was initiated to inform DOE and NRC personnel on initial details of sodium-cooled fast reactor, separations, waste form, and safeguard technologies being considered for the Advanced Fuel Cycle Research and Development program, and to learn the important lesson from the licensing process for the Clinch River Breeder Reactor Plant that educating the NRC staff early in the regulatory process is very important and critical to a project success.

  20. Assessing the role of regulatory bodies in managing health professional issues and errors in Europe.

    Science.gov (United States)

    Risso-Gill, Isabelle; Legido-Quigley, H; Panteli, D; Mckee, M

    2014-08-01

    This paper explores how medical regulatory bodies in nine European countries manage professional issues involving quality and patient safety, to build on limited existing information on procedures for regulating medical professionals in Europe. Twelve vignettes describing scenarios of concerns about standards of physicians were developed, covering clinical, criminal and administrative matters. Medical regulatory bodies in nine European countries were asked what action they would normally take in each situation. Their responses were related to their regulatory mandate. Responses varied greatly across participating countries. Regulators are always involved where patients are at risk or where a criminal offence is committed within the clinical setting. Non-criminal medical issues were generally handled by the employer, if any, at their discretion. Countries varied in the use of punitive measures, the extent to which they took an interest in issues arising outside professional activities, and whether they dealt with issues themselves or referred cases to another regulatory authority or took no action at all. There is little consistency across Europe on the regulation of medical professionals. There is considerable diversity in the range of topics that regulatory bodies oversee, with almost all covering health care quality and safety and others encompassing issues related to reputation, respect and trust. These inconsistencies have significant implications for professional mobility, patient safety and quality of care. © The Author 2014. Published by Oxford University Press in association with the International Society for Quality in Health Care; all rights reserved.

  1. International certification of nuclear power reactors design. A proposal from the U.S. NRC (Nuclear Regulatory Commission)

    International Nuclear Information System (INIS)

    Felizia, Eduardo R.

    2006-01-01

    The proposal foundations of the Nuclear Regulatory Commission Board Chairman are briefly described, which were enunciated at a meeting on Fourth Generation Reactors (Washington, March 2005). This proposal is analyzed mainly from the point of view of its consequences in third countries buyers of nuclear technology. The analysis is complemented by descriptions of the current process of the NRC design certification and of Third and Fourth Generation Reactors. (author) [es

  2. 75 FR 79049 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-12-17

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2008-0427] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 3.12...

  3. 75 FR 45173 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-02

    ... ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are... NUCLEAR REGULATORY COMMISSION [NRC-2008-0638] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.151...

  4. 76 FR 18262 - Notice of issuance of Regulatory Guide

    Science.gov (United States)

    2011-04-01

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0277] Notice of issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.44...

  5. 76 FR 14107 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-03-15

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0276] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.43...

  6. 76 FR 14108 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-03-15

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . The regulatory... NUCLEAR REGULATORY COMMISSION [NRC-2009-0275] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.50...

  7. 77 FR 33253 - Regulatory Guide 8.33, Quality Management Program

    Science.gov (United States)

    2012-06-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0126] Regulatory Guide 8.33, Quality Management Program... Regulatory Commission (NRC or Commission) is withdrawing Regulatory Guide (RG) 8.33, ``Quality Management... Quality Management Program was deleted from the regulations as part of an overall revision in 2002 of the...

  8. Indexes to Nuclear Regulatory Commission issuances, July--December 1992

    International Nuclear Information System (INIS)

    1993-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Digests and Legal Citations Index, Subject Index, and Facility Index. Subject words and/or phrases arranged alphabetically, indicate the issues and subjects covered in the issuances. The subject headings are followed by phrases that give specific information about the subject, as discussed in the issuances being indexed. These phrases are followed by the issuance number and the full text reference

  9. Regulatory and technical reports (Abstract Index Journal). Compilation for first quarter 1986, January-March. Volume 11, No. 1

    International Nuclear Information System (INIS)

    1986-04-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission staff and its contractors, as well as conference proceedings. Entries are indexed by contractor report number, personal author, subject, NRC originating organization, NRC contract sponsor, contractor, and licensed facility

  10. Joint ANSI-INMM 8.1: Nuclear Regulatory Commission study of uranium hexafluoride cylinder material accountability bulk measurements

    International Nuclear Information System (INIS)

    Pontius, P.E.; Doher, L.W.

    1977-01-01

    This paper reports the progress to date in a demonstration of the procedures in ANSI N15.18-1975, ''Mass Calibration Techniques for Nuclear Material Control,'' sponsored and funded by the Nuclear Regulatory Commission (NRC). The philosophy of mass measurement as a production process, as promulgated in ANSI N15.18-1975, is reviewed. Special emphasis is placed on the use of artifact Reference Mass Standards (RMS) as references for uranium hexafluoride (UF 6 ) calibration and bulk measurement processes. The history of the creation of the artifact concept and its adoption by ANSI N15.18-1975 and the Nuclear Regulatory Commission is narrated. The program now under way is specifically described; including descriptions of the RMS, their calibration, and the assignment of uncertainties to them by the National Bureau of Standards (NBS). Instrument tests, in-house standards (IHS), and assignment of values relative to the RMS-NBS values at nuclear facilities which measure UF 6 cylinders are described. Comparisons and the data base are detailed to provide realistic measurement process parameters associated with accountable transfer of UF 6 . The as yet uncompleted part of the demonstration is described, that is, to further close the measurement loop by verification both between and within facilities

  11. 75 FR 5630 - Draft Regulatory Guide: Issuance, Availability

    Science.gov (United States)

    2010-02-03

    ... ``Regulatory Guides'' collection of the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0031] Draft Regulatory Guide: Issuance, Availability... Guide, DG-4017. FOR FURTHER INFORMATION CONTACT: Gregory Chapman, U.S. Nuclear Regulatory Commission...

  12. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    International Nuclear Information System (INIS)

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities

  13. Uranium recovery research sponsored by the Nuclear Regulatory Commission at Pacific Northwest Laboratory. Annual progress report, May 1982-May 1983

    Energy Technology Data Exchange (ETDEWEB)

    Foley, M.G.; Opitz, B.E.; Deutsch, W.J.; Peterson, S.R.; Gee, G.W.; Serne, R.J.; Hartley, J.N.; Thomas, V.W.; Kalkwarf, D.R.; Walters, W.H.

    1983-06-01

    Pacific Northwest Laboratory (PNL) is currently conducting research for the US Nuclear Regulatory Commission (NRC) on uranium recovery process wastes for both active and inactive operations. NRC-sponsored uranium recovery research at PNL is focused on NRC regulatory responsibilities for uranium-recovery operations: license active milling and in situ extraction operations; concur on the acceptability of DOE remedial-action plans for inactive sites; and license DOE to maintain inactive sites following remedial actions. PNL's program consists of four coordinated projects comprised of a program management task and nine research tasks that address the critical technical and safety issues for uranium recovery. Specifically, the projects endeavor to find and evaluate methods to: prevent erosion of tailings piles and prevent radon release from tailings piles; evaluate the effectiveness of interim stabilization techniques to prevent wind erosion and transport of dry tailings from active piles; estimate the dewatering and consolidation behavior of slurried tailings to promote early cover placement; design a cover-protection system to prevent erosion of the cover by expected environmental stresses; reduce seepage into ground water and prevent ground-water degradation; control solution movement and reaction with ground water in in-situ extraction operations; evaluate natural and induced restoration of ground water in in-situ extraction operations; and monitor releases to the environment from uranium recovery facilities.

  14. Regulatory and technical reports. Compilation for second quarter 1982, April to June

    International Nuclear Information System (INIS)

    1982-08-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, and NUREG/CR-XXXX. A detailed explanation of the entries precedes each index

  15. Site-specific parameter values for the Nuclear Regulatory Commission's food pathway dose model

    International Nuclear Information System (INIS)

    Hamby, D.M.

    1992-01-01

    Routine operations at the Savannah River Site (SRS) in Western South Carolina result in radionuclide releases to the atmosphere and to the Savannah River. The resulting radiation doses to the off-site maximum individual and the off-site population within 80 km of the SRS are estimated on a yearly basis. These estimates are currently generated using dose models prescribed for the commercial nuclear power industry by the Nuclear Regulatory Commission (NRC). The NRC provides default values for dose-model parameters for facilities without resources to develop site-specific values. A survey of land- and water-use characteristics for the Savannah River area has been conducted to determine site-specific values for water recreation, consumption, and agricultural parameters used in the NRC Regulatory Guide 1.109 (1977) dosimetric models. These site parameters include local characteristics of meat, milk, and vegetable production; recreational and commercial activities on the Savannah River; and meat, milk, vegetable, and seafood consumption rates. This paper describes how parameter data were obtained at the Savannah River Site and the impacts of such data on off-site dose. Dose estimates using site-specific parameter values are compared to estimates using the NRC default values

  16. Safety research programs sponsored by Office of Nuclear Regulatory Research: Progress report, July 1--September 30, 1988

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, A J [comp.

    1989-02-01

    This progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the Division of Regulatory Applications, Division of Engineering, Division of Safety Issue Resolution, and Division of Systems of the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research following the reorganization in July 1988. The previous reports have covered the period October 1, 1976 through June 30, 1988. 71 figs., 24 tabs.

  17. Safety research programs sponsored by Office of Nuclear Regulatory Research: Progress report, July 1--September 30, 1988

    International Nuclear Information System (INIS)

    Weiss, A.J.

    1989-02-01

    This progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the Division of Regulatory Applications, Division of Engineering, Division of Safety Issue Resolution, and Division of Systems of the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research following the reorganization in July 1988. The previous reports have covered the period October 1, 1976 through June 30, 1988. 71 figs., 24 tabs

  18. 75 FR 52999 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-30

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition... NUCLEAR REGULATORY COMMISSION [NRC-2009-0556] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 8.35...

  19. 75 FR 45171 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-08-02

    ... ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ and through the NRC's Agencywide... NUCLEAR REGULATORY COMMISSION [NRC-2010-0072] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 3.13...

  20. 75 FR 37842 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-06-30

    ... site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition... NUCLEAR REGULATORY COMMISSION [NRC-2009-0396] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 2.5...

  1. 75 FR 43207 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-07-23

    ... NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0282] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.141...

  2. 75 FR 33361 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-06-11

    ....gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for inspection at the... NUCLEAR REGULATORY COMMISSION [NRC-2009-0308] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.28...

  3. 75 FR 16525 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-01

    ... http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for... NUCLEAR REGULATORY COMMISSION [NRC-2009-0413] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.11...

  4. 75 FR 27599 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-05-17

    ...'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available for... NUCLEAR REGULATORY COMMISSION [NRC-2009-0492] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of issuance and availability of Regulatory Guide 6.7...

  5. 77 FR 42349 - Self-Regulatory Organizations; NYSE Amex LLC; Order Approving a Proposed Rule Change Defining a...

    Science.gov (United States)

    2012-07-18

    ... ATP Holders via Regulatory Bulletin regarding the rule change. The Exchange plans to issue notice....\\7\\ \\7\\ See Notice, supra note 3, at 32158. III. Discussion The Commission finds that the proposed...

  6. The Energy Regulatory Commission. The Regulation of Natural Gas in Mexico

    International Nuclear Information System (INIS)

    1995-01-01

    In May of 1995 the Congress approved amendments to the Regulatory Law of Constitutional article 27 on Petroleum. This legal reform fundamentally redefined the petroleum industry and authorizes the private sector to construct, operate, and own natural gas transportation, storage and distribution systems-activities previously reserved to the state. To complement these reforms and to implement the legislative mandate of the Regulatory Law on Petroleum, the Natural Gas Regulation (Reglamento de Gas Natural) was issued in November 1995. The regulation reconciles the interests of the various natural gas industry participants and signifies a Federal Commitment to promote comprehensive development of the industry. In parallel with the development of the substantive legal framework, the law of the Comision Reguladora de Energia (CRE) was also enacted by Congress in October 1995 to strength the institutional framework and implemented the legal changes. This law defines the CRE as an agency of the Energy Ministry with technical, operational, and budgetary autonomy, and responsibility for implementing natural gas industry regulation. (Author)

  7. 75 FR 16202 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-03-31

    ... Guides'' at http://www.nrc.gov/reading-rm/doc-collections/ . In addition, regulatory guides are available... NUCLEAR REGULATORY COMMISSION [NRC-2008-0644] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide (RG) 1.126...

  8. 75 FR 81675 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-12-28

    ... through the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2010-0031] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 4.16...

  9. 75 FR 20399 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-19

    ... the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2009-0418] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 6.9...

  10. 76 FR 31382 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2011-05-31

    ... the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0287] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 8.2...

  11. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  12. 75 FR 12804 - Withdrawal of Regulatory Guide 8.6

    Science.gov (United States)

    2010-03-17

    ... ``Regulatory Guides'' in the NRC's Electronic Reading Room at http://www.nrc.gov/reading-rm/doc-collections... NUCLEAR REGULATORY COMMISSION [NRC-2010-0103] Withdrawal of Regulatory Guide 8.6 AGENCY: Nuclear Regulatory Commission. ACTION: Withdrawal of Regulatory Guide 8.6, ``Standard Test Procedure for Geiger-M...

  13. 75 FR 20868 - Notice of Issuance of Regulatory Guide

    Science.gov (United States)

    2010-04-21

    ... available through the NRC's public Web site under ``Regulatory Guides'' at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2009-0351] Notice of Issuance of Regulatory Guide AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Issuance and Availability of Regulatory Guide 1.68.2...

  14. Demonstration of a repository performance assessment capability at the US Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Codell, R.; Eisenberg, N.; McCartin, T.; Park, J.

    1991-01-01

    In order to better review licensing submittals for a High-Level Waste Repository, the US Nuclear Regulatory Commission staff has expanded and improved its capability to conduct performance assessments. A demonstration of this capability used the limited data from Yucca Mountain, Nevada to investigate a small set of scenario classes. Models of release and transport of radionuclides from a repository via the groundwater and direct release pathways provided preliminary estimates of releases to the accessible environment for a 10,000 year simulation time. Latin hypercube sampling of input parameters was used to express results as distributions and to investigate model sensitivities. This methodology demonstration should not be interpreted as an estimate of performance of the proposed repository at Yucca Mountain, Nevada

  15. Development of a stable uranium recovery regulatory framework for uranium recovery activities in the United States

    International Nuclear Information System (INIS)

    Layton, M.C.; Abrams, C.E.

    2000-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has historically regulated operations at all uranium and thorium recovery facilities under the authority of the Atomic Energy Act of 1954, as amended. Uranium recovery facilities are those plants, or portions of facilities that process uranium- or thorium-bearing material primarily for its source material content. The uranium recovery industry expressed some concerns over several aspects of the NRC's practices, as described in the NRC's guidance documents. In April 1998, the National Mining Association submitted a report to the Commission, that identified specific concerns with NRC's current position and guidance regarding concurrent jurisdiction at uranium mills; dual regulatory authority at in situ leach facilities; the use of mill tailings impoundments for disposal of radioactive material other than 11e.(2) byproduct material; and the ability to process alternate feed material at uranium mills. The NRC staff addressed most of these concerns in two SECY (staff recommendations) papers that were concurrently provided to the Commission, along with a SECY paper on a draft rulemaking plan relating to these and other issues. The issues addressed in these papers included a new rulemaking, disposal of materials other than 11 e.(2) byproduct material, processing of materials other than natural ores, and improved efficiency for regulating in situ leach uranium facilities. The Commission issued final policy decisions on these issues and directions for NRC staff to implement those decisions in July 2000. (author)

  16. Examining Key Issues Underlying the Audit Commission Reports on SEN Policy Paper 1 (5th Series)

    Science.gov (United States)

    Norwich, Brahm; Beek, Chris; Richardson, Penny; Gray, Peter

    2004-01-01

    This book is the first publication in the fifth series of seminars organised by the SEN Policy Options Steering Group to examine policy issues to do with special educational needs. The aim of the seminar was to examine in depth several underlying issues raised by the recent Audit Commission Reports on special educational needs. The seminar…

  17. Regulatory analysis technical evaluation handbook. Final report

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of this Handbook is to provide guidance to the regulatory analyst to promote preparation of quality regulatory analysis documents and to implement the policies of the Regulatory Analysis Guidelines of the US Nuclear Regulatory Commission (NUREG/BR-0058 Rev. 2). This Handbook expands upon policy concepts included in the NRC Guidelines and translates the six steps in preparing regulatory analyses into implementable methodologies for the analyst. It provides standardized methods of preparation and presentation of regulatory analyses, with the inclusion of input that will satisfy all backfit requirements and requirements of NRC's Committee to Review Generic Requirements. Information on the objectives of the safety goal evaluation process and potential data sources for preparing a safety goal evaluation is also included. Consistent application of the methods provided here will result in more directly comparable analyses, thus aiding decision-makers in evaluating and comparing various regulatory actions. The handbook is being issued in loose-leaf format to facilitate revisions. NRC intends to periodically revise the handbook as new and improved guidance, data, and methods become available

  18. Present activities of the Nuclear Energy Commission in the field of safety of radiation sources and security of radioactive materials in Mongolia

    International Nuclear Information System (INIS)

    Oyuntulkhuur, N.

    2001-01-01

    The Radiation Safety Department of the Nuclear Energy Commission (NEC) is a regulatory body in Mongolia established in 1997. The paper gives a general overview of the main activities of the NEC on regulatory control of radiation sources in Mongolia. Mongolia declared itself a nuclear-weapon-free zone in 1992. Legal framework and waste management issues are described. The regulatory authority's co-operation with other agencies in radiation protection is also presented in this paper. (author)

  19. Total System Performance Assessment Sensitivity Analyses for Final Nuclear Regulatory Commission Regulations

    International Nuclear Information System (INIS)

    Bechtel SAIC Company

    2001-01-01

    This Letter Report presents the results of supplemental evaluations and analyses designed to assess long-term performance of the potential repository at Yucca Mountain. The evaluations were developed in the context of the Nuclear Regulatory Commission (NRC) final public regulation, or rule, 10 CFR Part 63 (66 FR 55732 [DIRS 156671]), which was issued on November 2, 2001. This Letter Report addresses the issues identified in the Department of Energy (DOE) technical direction letter dated October 2, 2001 (Adams 2001 [DIRS 156708]). The main objective of this Letter Report is to evaluate performance of the potential Yucca Mountain repository using assumptions consistent with performance-assessment-related provisions of 10 CFR Part 63. The incorporation of the final Environmental Protection Agency (EPA) standard, 40 CFR Part 197 (66 FR 32074 [DIRS 155216]), and the analysis of the effect of the 40 CFR Part 197 EPA final rule on long-term repository performance are presented in the Total System Performance Assessment--Analyses for Disposal of Commercial and DOE Waste Inventories at Yucca Mountain--Input to Final Environmental Impact Statement and Site Suitability Evaluation (BSC 2001 [DIRS 156460]), referred to hereafter as the FEIS/SSE Letter Report. The Total System Performance Assessment (TSPA) analyses conducted and documented prior to promulgation of the NRC final rule 10 CFR Part 63 (66 FR 55732 [DIRS 156671]), were based on the NRC proposed rule (64 FR 8640 [DIRS 101680]). Slight differences exist between the NRC's proposed and final rules which were not within the scope of the FEIS/SSE Letter Report (BSC 2001 [DIRS 156460]), the Preliminary Site Suitability Evaluation (PSSE) (DOE 2001 [DIRS 155743]), and supporting documents for these reports. These differences include (1) the possible treatment of ''unlikely'' features, events and processes (FEPs) in evaluation of both the groundwater protection standard and the human-intrusion scenario of the individual

  20. Nuclear Regulatory Commission issuances, April 1994

    International Nuclear Information System (INIS)

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, June 1992

    International Nuclear Information System (INIS)

    1992-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, December 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Defense (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances, May 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances, July 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, December 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances, December 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, September 1992

    International Nuclear Information System (INIS)

    1992-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, February 1992

    International Nuclear Information System (INIS)

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, March 1993

    International Nuclear Information System (INIS)

    1993-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances, July 1993

    International Nuclear Information System (INIS)

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, August 1992

    International Nuclear Information System (INIS)

    1992-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, August 1991

    International Nuclear Information System (INIS)

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, February 1993

    International Nuclear Information System (INIS)

    1993-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, November 1992

    International Nuclear Information System (INIS)

    1992-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, April 1993

    International Nuclear Information System (INIS)

    1993-04-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Review and evaluation of the Nuclear Regulatory Commission safety research program for Fiscal Year 1983. Report to the Congress

    International Nuclear Information System (INIS)

    1982-02-01

    Public Law 95-209 includes a requirement that the Advisory Committee on Reactor Safeguards submit an annual report to Congress on the safety research program of the Nuclear Regulatory Commission. This report presents the results of the ACRS review and evaluation of the NRC safety research program for Fiscal Year 1983. The report contains a number of comments and recommendations

  18. 76 FR 18457 - Regulatory Review Schedule; Tribal Consultation

    Science.gov (United States)

    2011-04-04

    ... that the NIGC provide tribal gaming commissions access to licensing information via an online database... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule; Tribal Consultation AGENCY: National Indian Gaming Commission. ACTION: Notice of Regulatory...

  19. Indexes to Nuclear Regulatory Commission issuances, July--December 1996. Volume 44, Index 2

    International Nuclear Information System (INIS)

    1997-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by apellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (operating license, operating license amendment, etc.); type of issuance (memorandum, order, decision, etc.)

  20. Indexes to Nuclear Regulatory Commission issuances, July--December 1996. Volume 44, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decision on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by apellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (operating license, operating license amendment, etc.); type of issuance (memorandum, order, decision, etc.).

  1. Indexes to Nuclear Regulatory Commission issuances, July--September 1995. Volume 42, Index 1

    International Nuclear Information System (INIS)

    1995-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  2. Indexes to Nuclear Regulatory Commission issuances, July--December 1994. Volume 40, Index 2

    International Nuclear Information System (INIS)

    1994-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board panel (LBP), the Administrative Law Judges, the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.)

  3. Indexes to Nuclear Regulatory Commission issuances: July--September 1994. Volume 40, Index 1

    International Nuclear Information System (INIS)

    1994-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility), full text reference (volume and pagination), issuance number, issues raised by apellants, legal citations (cases, regulations, and statutes), name of facility, docket number, subject matter of issues and/or rulings, type of hearing (for construction permit, operating license, etc.), type of issuance (Memorandum, order, decision, etc.)

  4. Indexes to Nuclear Regulatory Commission issuances, January--March 1995. Volume 41, Index 1

    International Nuclear Information System (INIS)

    1995-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  5. Indexes to Nuclear Regulatory Commission issuances, July--December 1994. Volume 40, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board panel (LBP), the Administrative Law Judges, the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.).

  6. Indexes to Nuclear Regulatory Commission issuances: July--September 1994. Volume 40, Index 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decision (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility), full text reference (volume and pagination), issuance number, issues raised by apellants, legal citations (cases, regulations, and statutes), name of facility, docket number, subject matter of issues and/or rulings, type of hearing (for construction permit, operating license, etc.), type of issuance (Memorandum, order, decision, etc.).

  7. Nuclear Regulatory Commission issuances, May 1982

    International Nuclear Information System (INIS)

    1982-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Appeal Boards, the Atomic Safety and Licensing Boards, the Administrative Law Judge, the Directors' Decision, and the Denials of Petitions for Rulemaking

  8. Selected review of regulatory standards and licensing issues for nuclear power plants

    International Nuclear Information System (INIS)

    Stevenson, J.D.; Thomas, F.A.

    1982-11-01

    This report presents a compilation and description of current foreign regulatory standards and licensing issues in the areas of interest associated with Siting, Structural Engineering, Metallurgy and Materials, and Mechanical Engineering. In addition, summary comparisons of the requirements of both the US and foreign nuclear power plant regulatory standards are provided. The selected foreign countries surveyed include Canada, France, Japan, Sweden, United Kingdom of Great Britain and Northern Ireland, and the Federal Republic of Germany

  9. Unresolved safety issues summary: aqua book

    International Nuclear Information System (INIS)

    1982-06-01

    The unresolved safety issues summary is designed to provide the management of the Nuclear Regulatory Commission with a quarterly overview of the progress and plans for completion of generic tasks addressing unresolved safety issues reported to Congress pursuant to Section 210 of the Energy Reorganization Act of 1974 as amended. This summary utilizes data collected from the Office of Nuclear Reactor Regulation, Office of Nuclear Regulatory Research, and the National Laboratories and is prepared by the Office of Resource Management. The schedules in this book include a milestone at the end of each action plan which represents the initiation of the implementation process both with respect to incorporation of the technical resolution in the NRC official guidance or requirements and also the application of changes to individual operating plants. The progress and status for implementation of unresolved safety issues for which a technical resolution has been completed are reported specifically in a separate table provided in this summary

  10. 77 FR 2298 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    Science.gov (United States)

    2012-01-17

    ... nation's leaders in medicine, science, ethics, religion, law, and engineering. The Commission advises the President on bioethical issues arising from advances in biomedicine and related areas of science and... research, health care delivery, and technological innovation are conducted in a socially and ethically...

  11. Regulatory issues on using programmable logic device in nuclear power plants

    International Nuclear Information System (INIS)

    Park, G. Y.; Yu, Y. J.; Kim, H. T.; Kwon, Y. I.; Park, H. S.; Jeong, C. H.

    2012-01-01

    For replacing obsolete analog equipment in nuclear power plant, the Programmable Logic Devices (PLDs) using Hardware Description Language (HDL) have been widely adopted in digitalized Instrumentation and Control (I and C) systems because of its flexibility. For safety reviews on Nuclear Power Plants (NPPs,) qualifying digitalized safety I and C system using PLDs is an important issue. As an effort to provide regulatory position on using PLDs in safety I and C system, there is a research project to provide the regulatory positions against emerging issues involved with digitalisation of I and C system including using PLDs. Therefore, this paper addresses the important considerations for using PLDs in safety I and C systems such as diversity, independence and qualification, etc. In this point, this study focuses on technical reports for Field Programmable Gate Array (FPGA) from EPRI,. U.S. NRC, and relevant technical standards

  12. Regulatory issues on using programmable logic device in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Park, G. Y.; Yu, Y. J.; Kim, H. T.; Kwon, Y. I.; Park, H. S.; Jeong, C. H. [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2012-10-15

    For replacing obsolete analog equipment in nuclear power plant, the Programmable Logic Devices (PLDs) using Hardware Description Language (HDL) have been widely adopted in digitalized Instrumentation and Control (I and C) systems because of its flexibility. For safety reviews on Nuclear Power Plants (NPPs,) qualifying digitalized safety I and C system using PLDs is an important issue. As an effort to provide regulatory position on using PLDs in safety I and C system, there is a research project to provide the regulatory positions against emerging issues involved with digitalisation of I and C system including using PLDs. Therefore, this paper addresses the important considerations for using PLDs in safety I and C systems such as diversity, independence and qualification, etc. In this point, this study focuses on technical reports for Field Programmable Gate Array (FPGA) from EPRI,. U.S. NRC, and relevant technical standards.

  13. Preservation and Implementation of Decommissioning Lessons Learned in the United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Rodriguez, Rafael L.

    2008-01-01

    Over the past several years, the United States Nuclear Regulatory Commission (NRC) has actively worked to capture and preserve lessons learned from the decommissioning of nuclear facilities. More recently, NRC has involved industry groups, the Organization of Agreement States (OAS), and the Department of Energy (DOE) in the effort to develop approaches to capture, preserve and disseminate decommissioning lessons learned. This paper discusses the accomplishments of the working group, some lessons learned by the NRC in the recent past, and how NRC will incorporate these lessons learned into its regulatory framework. This should help ensure that the design and operation of current and future nuclear facilities will result in less environmental impact and more efficient decommissioning. In summary, the NRC will continue capturing today's experience in decommissioning so that future facilities can take advantage of lessons learned from today's decommissioning projects. NRC, both individually and collectively with industry groups, OAS, and DOE, is aggressively working on the preservation and implementation of decommissioning lessons learned. The joint effort has helped to ensure the lessons from the whole spectrum of decommissioning facilities (i.e., reactor, fuel cycle, and material facilities) are better understood, thus maximizing the amount of knowledge and best practices obtained from decommissioning activities. Anticipated regulatory activities at the NRC will make sure that the knowledge gained from today's decommissioning projects is preserved and implemented to benefit the nuclear facilities that will decommission in the future

  14. Nuclear Regulatory Commission issuances, July 1988

    International Nuclear Information System (INIS)

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission Issuances, October 1986

    International Nuclear Information System (INIS)

    1986-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, May 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, September 1987

    International Nuclear Information System (INIS)

    1987-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances, April 1989

    International Nuclear Information System (INIS)

    1989-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances, July 1989

    International Nuclear Information System (INIS)

    1989-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, March 1989

    International Nuclear Information System (INIS)

    1989-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, May 1989

    International Nuclear Information System (INIS)

    1989-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, May 1990

    International Nuclear Information System (INIS)

    1990-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, August 1990

    International Nuclear Information System (INIS)

    1990-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances, October 1989

    International Nuclear Information System (INIS)

    1989-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances, June 1987

    International Nuclear Information System (INIS)

    1987-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, April 1987

    International Nuclear Information System (INIS)

    1987-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuances, August 1986

    International Nuclear Information System (INIS)

    1986-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, November 1988

    International Nuclear Information System (INIS)

    1988-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission Issuances, March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    The report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, November 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances, June 1990

    International Nuclear Information System (INIS)

    1990-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, December 1990

    International Nuclear Information System (INIS)

    1990-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, December 1989

    International Nuclear Information System (INIS)

    1989-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances, February 1989

    International Nuclear Information System (INIS)

    1989-02-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, February 1985

    International Nuclear Information System (INIS)

    1985-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, November 1990

    International Nuclear Information System (INIS)

    1990-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    International Nuclear Information System (INIS)

    Wilmot, Roger D.

    2011-02-01

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  18. Indexes to Nuclear Regulatory Commission issuances, January-June 1983. Volume 17, Index 2

    International Nuclear Information System (INIS)

    1983-10-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, Docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  19. Nuclear Regulatory Commission issuances, April 1991

    International Nuclear Information System (INIS)

    1991-04-01

    This report includes the issuances received during the specified period (April 1991) from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances. Volume 47, Number 3

    International Nuclear Information System (INIS)

    1998-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The two issuances included here are: (1) the Commission issuance to the US Enrichment Corporation and (2) the Director's Decision to the North Atlantic Energy Service Corporation

  1. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest

    International Nuclear Information System (INIS)

    1980-02-01

    This first supplement to the second edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board and Atomic Safety and Licensing Board decisions issued during the period from April 1, 1978 to September 30, 1978 interpreting the NRC's Rules of Practice in 10 CFR Part 2. The supplement also includes additional material from adjudicatory decisions rendered prior to April 1, 1978 and, to a very limited degree, material from adjudicatory decisions and regulation changes after September 30, 1978. The supplement, which is intended to be used as a pocket-part supplement to the Digest itself, includes a number of new subsections and topics not covered in the Digest. The new subsections are noted in the index for the supplement

  2. United State Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board, and Licensing Board decisions, July 1972--June 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 30, 1988 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This edition replaces in their entirety earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through June 30, 1988

  3. Overview of the Nuclear Regulatory Commission's revised 10 CFR Part 20

    International Nuclear Information System (INIS)

    Peterson, H.T. Jr.

    1990-01-01

    The principal Nuclear Regulatory Commission (NRC) regulations covering radiation protection are in Part 20 of Title 10 of the Code of Federal Regulations (10 CFR Part 20). These regulations apply to almost all NRC licensed activities including nuclear power and research reactors, nuclear medicine, industrial radiography and the use of most radioactive isotopes in research. The revised 10 CFR Part 20 is based on the 1977 recommendations of the International Commission on Radiological Protection (ICRP) in ICRP Publication No. 26, implements the 1987 Federal Radiation Guidance on Occupational Exposure and is generally consistent with the 1987 recommendations of the U.S. National Council on Radiation Protection and Measurements (NCRP) in NCRP Report No. 91. There are a number of areas where the Revised Part 20 employs new and more up-to-date scientific information and concepts. One major change is in the use of revised lung and GI tract models and more recent metabolic retention data to calculate Annual Limits on Intake (ALI's) and Derived Air Concentration limits (DAC's). The Appendix B in the Revised Part 20 employs new and more up-to-date scientific information and concepts. One major change is in the use of revised lung and GI tract models and more recent metabolic retention data to calculate Annual Limits on Intake (ALI's) and Derived Air Concentration limits (DAC's). The Appendix B in the Revised Part 20 contains data on occupational ALI's and DCA's and radionuclide concentration limits for releases to the general environment for over 750 radionuclides. The final rule is expected to be published early in September with an implementation data of January 1, 1992

  4. Introduction to the Unified Agenda of Federal Regulatory and Deregulatory Actions

    Science.gov (United States)

    2010-04-26

    ... Regulatory Commission Federal Housing Finance Agency Federal Maritime Commission Federal Mediation and... that the Regulatory Flexibility Act may require a Regulatory Flexibility Analysis, actions selected for.... Regulatory Flexibility Analysis Required -- whether an analysis is required by the Regulatory Flexibility Act...

  5. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  6. 75 FR 17456 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving...

    Science.gov (United States)

    2010-04-06

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Order Approving Proposed Rule Change..., Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission... terms. For more information about the rulebook consolidation process, see Information Notice, March 12...

  7. Access to the decision-making process: opportunities for public involvement in the facility decommissioning process of the United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Cameron, F.X.

    1996-01-01

    This paper discusses recent initiatives taken by the United States Nuclear Regulatory Commission NRC) to effectively involve the public in decommissioning decisions. Initiatives discussed include the Commission's rulemaking to establish the radiological criteria for decommissioning, as well as public involvement methods that have been used on a site-by-site basis. As un example of public involvement, the NRC is currently in the process of developing generic rules on the radiological criteria for the decontamination and decommissioning of NRC-licensed sites. Not only was this proposed rule developed through an extensive and novel approach for public involvement, but it also establishes the basic provisions that will govern public involvement in future NRC decisions on the decommissioning of individual sites. The aim is to provide the public with timely information about all phases of the NRC staff to express concerns and make recommendations. Th NRC recognizes the value and the necessity of effective public involvement in its regulatory activities and has initiated a number of changes to its regulatory program to accomplish this. From the NRC's perspective, it is much easier and less costly to incorporate these mechanisms for public involvement into the regulatory program early in the process, rather than try to add them after considerable public controversy on an action has already been generated. The historical antecedents for initiatives mentioned, as well as 'lessons learned' from prior experience are also discussed. (author)

  8. Study of the Nuclear Regulatory Commission's Appellate System

    International Nuclear Information System (INIS)

    Bickwit, L.; Malsch, M.; Ostrach, S.; Christenson, K.

    1979-12-01

    At the Chairman's request the Office of the General Counsel studied the Commission's appellate system. The study included examination of the development of the study, analysis of the current workload, investigation of the practices of other agencies, and consideration of alternatives to the present system. The study recommends retention of the present system with some limited modifications to enable the Commission to more effectively use its existing appellate powers

  9. Safeguards and security issues at the MRS facility

    International Nuclear Information System (INIS)

    McGuinn, E.; Birch, M.; Jones, J.; Floyd, W.

    1993-01-01

    The U.S. Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for disposing of the nation's high level radioactive waste in a way that ensures the protection of the public from any unacceptable radiological risks and the maintenance of the national security. To achieve these objectives, OCRWM plans to institute a Nuclear Regulatory Commission (NRC)-approved security program at its facilities including the Monitored Retrievable Storage (MRS) facility. This program will safeguard nuclear information and provide not only for the physical protection of facilities but also for the nuclear material being handled and stored. Several key regulatory issues were identified during the development of the safeguards and security (S ampersand S) program for the MRS. These issues relate to developing a realistic definition of the security threat at the MRS and establishing a single set of regulatory requirements. Resolution of these issues is important to implement a realistic S ampersand S program who scope is commensurate with the potential risk at the MRS and complies with all appropriate regulatory requirements. OCRWM is working toward a timely resolution of these issues and on the formulation of an S ampersand S program for implementation at the MRS. As an initial step, DOE has proposed an S ampersand S strategy for the MRS based on a set of assumed resolutions to the key regulatory issues. With this approach, the facility designers will be able to evaluate possible S ampersand S concepts for integration into the MRS early in the design process

  10. 78 FR 62784 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of...

    Science.gov (United States)

    2013-10-22

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Designation of a Longer... 5210 (Publication of Transactions and Quotations) October 4, 2013. I. Introduction On August 15, 2013, Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission...

  11. Respirator studies for the Nuclear Regulatory Commission. Protection factors for supplied-air respirators. Progress report, October 1, 1976--September 30, 1977

    International Nuclear Information System (INIS)

    Hack, A.; Bradley, O.D.; Trujillo, A.

    1977-12-01

    This report describes the work performed during FY 1977 for the Nuclear Regulatory Commission. The Protection Factors (efficiency) provided by 25 NIOSH approved supplied-air respirators were determined while the devices were worn by a panel of anthropometrically selected test subjects. The major recommendation was that demand-type respirators should neither be used nor approved

  12. 75 FR 21686 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of...

    Science.gov (United States)

    2010-04-26

    ... to pay arbitration awards to remain in the securities industry presents regulatory risks and is...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing of Proposed Rule... Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission (``SEC'' or...

  13. Arrangement between the US Nuclear Regulatory Commission (USNRC) and the Belgian Government for Exchange of Technical Information in Regulatory Matters and in Cooperation in Safety Research and in Standards Development

    International Nuclear Information System (INIS)

    1978-01-01

    This Arrangement was concluded on 6 June 1978 between the United States Nuclear Regulatory Commission and the Belgian Government for exchange of technical information in regulatory matters and in co-operation in safety research and in standards development. Both Parties agree to exchange, as available, technical information related to the regulation of safety and the environmental impact of designated nuclear energy facilities and to safety research of designated types of nuclear facilities. As regards co-operation in safety research, the execution of joint programmes and projects under which activities are divided between the two Parties will be agreed on a case by case basis. The Parties further agree to co-operate in the development of regulatory standards applicable to the designated nuclear facilities. The Arrangement is valid for 5 years and may be extended. (NEA) [fr

  14. 18 CFR 388.104 - Informal advice from Commission staff.

    Science.gov (United States)

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  15. Report on the establishment and operation of the Federal Energy Regulatory Commission's Daycare Center

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-16

    We have completed an inspection of the Federal Energy Regulatory Commission's (FERC) Daycare Center (Center). The purpose of the inspection was to review for efficiency, economy and compliance with laws and regulations, FERC's establishment and operation of the Center. The inspection objectives were to review: (1) FERC's compliance with Federal laws and requirements of the General Services Administration and the District of Columbia; (2) the source and amount of funds for establishing and operating the Center; and (3) the organizational relationships between FERC, the Center and the contractor operating the Center.

  16. USNRC regulatory guidance for engineered safety feature air cleaning systems

    International Nuclear Information System (INIS)

    Bellamy, R.R.

    1991-01-01

    The need for clear, technically appropriate, and easily implementable guidance for the design, testing, and maintenance of nuclear air cleaning systems has long been recognized. Numerous industry consensus standards have been issued and revised over the last 30 years. Guidance has also been published by the US Nuclear Regulatory Commission in the form of regulations, regulatory guides, standard review plans, NUREG documents, and information notices. This paper will summarize the latest revisions to these documents and emphasize Regulatory Guide 1.52, Design, Testing, and Maintenance Criteria for Post-Accident Engineered-Safety-Feature Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants, which was last revised in 1978. The USNRC has undertaken a project to revise this regulatory guide, and the status of that revision is highlighted

  17. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972-December 1986

    International Nuclear Information System (INIS)

    1987-11-01

    This Revision 6 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1986, interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 6 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1986

  18. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1989

    International Nuclear Information System (INIS)

    1990-06-01

    This Revision 6 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1989 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 6 replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1989

  19. United States Nuclear Regulatory Commission Staff practice and procedure digest: Commission, Appeal Board and Licensing Board Decisions, July 1972-March 1987

    International Nuclear Information System (INIS)

    1987-12-01

    This Revision 7 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to March 31, 1987 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 7 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through March 31, 1987

  20. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--September 1988

    International Nuclear Information System (INIS)

    1989-04-01

    This Revision 1 of the fifth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1988 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 1 replaces in part earlier editions and supplements and includes appropriate changes reflecting the amendments to the Rules of Practice effective through September 30, 1988

  1. The latest occupational radiation exposure data from U.S. Nuclear Regulatory Commission Licensees

    International Nuclear Information System (INIS)

    Brock, T.

    2007-01-01

    This presentation summarizes the latest - 2005 occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commission (NRC) Radiation Exposure Information and Reporting System. The bulk of the information contained in the paper was compiled from the 2005 annual reports submitted by NRC licensees subject to the reporting requirements of U.S. regulations (10 CFR 20.2206). Those licensees subject to reporting include commercial nuclear power plants, industrial radiographers, fuel processors, independent spent fuel storage installations, manufacturers and distributors of by-product material, facilities for low-level waste disposal, and geologic repositories for high-level waste. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in terms of collective dose and the distribution of doses by licensee category. (author)

  2. Workshop on Regulatory Review and Safety Assessment Issues in Repository Licensing

    Energy Technology Data Exchange (ETDEWEB)

    Wilmot, Roger D. (Galson Sciences Limited (United Kingdom))

    2011-02-15

    The workshop described here was organised to address more general issues regarding regulatory review of SKB's safety assessment and overall review strategy. The objectives of the workshop were: - to learn from other programmes' experiences on planning and review of a license application for a nuclear waste repository, - to offer newly employed SSM staff an opportunity to learn more about selected safety assessment issues, and - to identify and document recommendations and ideas for SSM's further planning of the licensing review

  3. Application of a methodology to determine priorities for nuclear power plant safety issues

    International Nuclear Information System (INIS)

    Daling, P.M.

    1988-01-01

    The Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) is sponsoring a research program to determine priorities of nuclear power plant safety issues. A methodology has been developed at the Pacific Northwest Laboratory (PNL) to provide technical assistance in the development of risk and cost estimates for implementing resolutions to the safety issues. The information development methods are intended to provide the NRC with a consistent level of information for use in ranking the issues. The NRC uses this information, along with judgmental factors, to rank the issues for further consideration by the NRC staff. The primary purpose of the priority rankings are to assist in the allocation of resources to issues that have high potential for reducing public risk as well as to remove issues from further consideration that have little safety significance

  4. Safety and licensing issues for Indian PHWRs

    International Nuclear Information System (INIS)

    Srinivasan, G.R.; Das, M.

    1997-01-01

    India has achieved competency in design, construction, commissioning and operation of Pressurized Heavy Water Reactor based Nuclear Power Plants and has completed more than 120 reactor operating years with an extremely satisfactory safety record. In this paper, the safety management in NPCIL and operational safety aspects are discussed, licensing and regulatory approach is described and some of the main safety issues for Indian PHWRs are brought out. (author)

  5. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Digest No. 2

    International Nuclear Information System (INIS)

    1978-08-01

    This second edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to March 31, 1978 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This second edition replaces the first edition and its supplements and includes appropriate changes reflecting the recent amendments to the Rules of Practice which became effective on May 26, 1978

  6. US Nuclear Regulatory Commission organization charts and functional statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  7. US Nuclear Regulatory Commission organization charts and functional statements

    International Nuclear Information System (INIS)

    1996-01-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices

  8. Regulatory control of low level radiation exposure in Tanzania

    International Nuclear Information System (INIS)

    Nyanda, A.M.; Muhogora, W.E.

    1997-01-01

    In Tanzania, the radiation protection law was issued in 1983. Under this law, the National Radiation Commission is responsible for safe uses of ionizing radiation. The regulatory control of the resulting doses from the uses of radiation sources in medicine, industry, research and teaching is presented. The system of control reflects the existing interactions between the National Radiation Commission and users through the established radiation protection infrastructure. From the national dose registry data, it is found that the highest annual individual doses over 10 years ago, came from less than 5% of total monitored workers and were in the range 10 - 15 mSv y -1 . The experienced radiation levels in uncontrolled areas of potential workplaces is less than 1 μSv h -1 . The possibility for associating such low dose levels to the effectiveness of the existing regulatory dose control framework is discussed. Despite of this achievement, the need to improve further the radiation protection and safety programs is found necessary. (author)

  9. 76 FR 40412 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2011-07-08

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate..., Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission... a more limited application by their terms. For more information about the rulebook consolidation...

  10. Recent NRC research activities addressing valve and pump issues

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, D.L.

    1996-12-01

    The mission of the U.S. Nuclear Regulatory Commission (NRC) is to ensure the safe design, construction, and operation of commercial nuclear power plants and other facilities in the U.S.A. One of the main roles that the Office of Nuclear Regulatory Research (RES) plays in achieving the NRC mission is to plan, recommend, and implement research programs that address safety and technical issues deemed important by the NRC. The results of the research activities provide the bases for developing NRC positions or decisions on these issues. Also, RES performs confirmatory research for developing the basis to evaluate industry responses and positions on various regulatory requirements. This presentation summarizes some recent RES supported research activities that have addressed safety and technical issues related to valves and pumps. These activities include the efforts on determining valve and motor-operator responses under dynamic loads and pressure locking events, evaluation of monitoring equipment, and methods for detecting and trending aging of check valves and pumps. The role that RES is expected to play in future years to fulfill the NRC mission is also discussed.

  11. 76 FR 21084 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of...

    Science.gov (United States)

    2011-04-14

    ... Securities April 8, 2011. I. Introduction On March 3, 2011, the Financial Industry Regulatory Authority, Inc... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-64283; File No. SR-FINRA-2011-012] Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Designation of a Longer...

  12. Japan's regulatory and safety issues regarding nuclear materials transport

    Energy Technology Data Exchange (ETDEWEB)

    Saito, T. [Nuclear and Industrial Safety Agency, Ministry of Economy, Trade and Industry, Government of Japan, Tokyo (Japan); Yamanaka, T. [Japan Nuclear Energy Safety Organization, Government of Japan, Tokyo (Japan)

    2004-07-01

    This paper focuses on the regulatory and safety issues on nuclear materials transport which the Government of Japan (GOJ) faces and needs to well handle. Background information about the status of nuclear power plants (NPP) and nuclear fuel cycle (NFC) facilities in Japan will promote a better understanding of what this paper addresses.

  13. Indexes to Nuclear Regulatory Commission issuances, July--September 1992

    International Nuclear Information System (INIS)

    1993-04-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. These information elements are displayed in one or more of five separate formats arranged as follows: 1. Case Name Index: The case name index is an alphabetical arrangement of the case names of the issuances. Each case name is followed by the type of hearing, the type of issuance, docket number, issuance number, and full text reference. 2. Digests and Headers: The headers and digests are presented in issuance number order as follows: the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The header identifies the issuance by issuance number, case name, facility name, docket number, type of hearing, date of issuance, and type of issuance. 3. Legal Citations Index: This index is divided into four parts and consists of alphabetical or alpha-numerical arrangements of Cases, Regulations, Statutes, and Others. These citations are listed as given in the issuances. Changes in regulations and statutes may have occurred to cause changes in the number or name and/or applicability of the citation. It is therefore important to consider the date of the issuance. 4. Subject Index: Subject words and/or phrases, arranged alphabetically, indicate the issues and subjects covered in the issuances. 5. Facility Index: The index consists of an alphabetical arrangement of facility names from the issuance. The name is followed by docket number, type of hearing, data, type of issuance, issuance number, and full text reference

  14. Bringing a probiotic-containing functional food to the market: microbiological, product, regulatory and labeling issues.

    Science.gov (United States)

    Sanders, M E; Huis in't Veld, J

    1999-01-01

    Properly formulated probiotic-containing foods offer consumers a low risk, low cost dietary component that has the potential to promote health in a variety of ways. Several such products are available commercially, although markets in Japan and Europe are more developed than in the USA. Once healthful attributes of a probiotic product have been identified, there remain microbiological, product, regulatory and labeling issues to be addressed prior to marketing. Microbiological and product issues include safety, effective scale-up for manufacturing, definition of probiotic activity, probiotic stability in the product over the course of product manufacture, shelf-life and consumption, definition of effective dose and target population(s), and development of quality assurance approaches. Examples of probiotic-containing foods are given. Regulatory and labeling issues are complicated because they differ for each country, but are likewise critical because they provide the means for communication of the product benefits to the consumer. The regulatory climate worldwide appears to be one of caution about overstating the benefits of such products but at the same time not preventing corporate commitment to marketing.

  15. Package leaflets of the most consumed medicines in Portugal: safety and regulatory compliance issues. A descriptive study

    Directory of Open Access Journals (Sweden)

    Carla Pires

    Full Text Available CONTEXT AND OBJECTIVES: Package leaflets are necessary for safe use of medicines. The aims of the present study were: 1 to assess the compliance between the content of the package leaflets and the specifications of the pharmaceutical regulations; and 2 to identify potential safety issues for patients. DESIGN AND SETTING: Qualitative descriptive study, involving all the package leaflets of branded medicines from the three most consumed therapeutic groups in Portugal, analyzed in the Department of Pharmacoepidemiology, School of Pharmacy, University of Lisbon. METHODS: A checklist validated through an expert consensus process was used to gather the data. The content of each package leaflet in the sample was classified as compliant or non-compliant with compulsory regulatory issues (i.e. stated dosage and descriptions of adverse reactions and optional regulatory issues (i.e. adverse reaction frequency, symptoms and procedures in cases of overdose. RESULTS: A total of 651 package leaflets were identified. Overall, the package leaflets were found to be compliant with the compulsory regulatory issues. However, the optional regulatory issues were only addressed in around half of the sample of package leaflets, which made it possible to identify some situations of potentially compromised drug safety. CONCLUSION: Ideally, the methodologies for package leaflet approval should be reviewed and optimized as a way of ensuring the inclusion of the minimum essential information for safe use of medicines.

  16. Nuclear Regulatory Legislation

    International Nuclear Information System (INIS)

    1989-08-01

    This compilation of statutes and material pertaining to nuclear regulatory legislation through the 100th Congress, 2nd Session, has been prepared by the Office of the General Counsel, US Nuclear Regulatory Commission, with the assistance of staff, for use as an internal resource document. Persons using this document are placed on notice that it may not be used as an authoritative citation in lieu of the primary legislative sources. Furthermore, while every effort has been made to ensure the completeness and accuracy of this material, neither the United States Government, the Nuclear Regulatory Commission, nor any of their employees makes any expressed or implied warranty or assumes liability for the accuracy or completeness of the material presented in this compilation

  17. 76 FR 50796 - Self-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing...

    Science.gov (United States)

    2011-08-16

    ...-Regulatory Organizations; Financial Industry Regulatory Authority, Inc.; Notice of Filing and Immediate Effectiveness of Proposed Rule Change To Increase the Position Limit for Options on the Standard and Poor's... Financial Industry Regulatory Authority, Inc. (``FINRA'') filed with the Securities and Exchange Commission...

  18. Safety improvement and results of commissioning of Mochovce NPP WWER 440/213

    International Nuclear Information System (INIS)

    Lipar, M.

    1998-01-01

    Mochovce NPP is the last one of this kind and compared to its predecessors, it is characterized by several modifications which contribute to the improvement of the safety level. In addition based on Nuclear Regulatory Authority requirements and based on documents: - IAEA - Safety Issues and their ranking for NPP WWER 440/213, - IAEA - Safety Improvement of Mochovce NPP Project Review Mission, - Riskaudit - Evaluation of the Mochovce NPP Safety Improvements. Additional safety measures have been implemented before commissioning. The consortium EUCOM (FRAMATOME - SIEMENS), SKODA Praha, ENERGOPROJEKT Praha, Russian organizations and VUJE Trnava Nuclear Power Plants research institute were selected for design and implementation of the safety measures. The papers summarized, safety requirements, safety measures implemented, results of commissioning and results of safety analysis report evaluation. (author)

  19. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ14-4-000] Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No. 1000 Further Regional Compliance Filing to be effective...

  20. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2010-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ10-2-000] Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets for inclusion in its open access transmission...

  1. The core to regulatory reform

    International Nuclear Information System (INIS)

    Partridge, J.W. Jr.

    1993-01-01

    Federal Energy Regulatory Commission (FERC) Orders 436, 500, and 636, the Clean Air Act Amendments of 1990, Public Utility Holding Company Act reform, and the 1992 Energy Policy Act all can have significant effects on an LDC's operations. Such changes in an LDC's environments must be balanced by changes within the utility, its marketplace, and its state regulatory environment. The question is where to start. For Columbia Gas Distribution Cos., based in Columbus, OH, the new operating foundation begins with each employee. Internal strength is critical in designing initiatives that meet the needs of the marketplace and are well-received by regulators. Employees must understand not only the regulatory environment in which the LDC operates, but also how their work contributes to a positive regulatory relationship. To achieve this, Columbia initiated the COntinuing Regulatory Education program, or CORE, in 1991. CORE is a regulatory-focused, information-initiative program coordinated by Columbia's Regulatory Policy, Planning, and Government Affairs Department. The CORE programs can take many forms, such as emerging issue discussions, dialogues with regulators and key parties, updates on regulatory fillings, regulatory policy meetings, and formal training classes. The speakers and discussion facilitators can range from human resource department trainers to senior officers, from regulatory department staff members to external experts, or from state commissioners to executives from other LDCs. The goals of CORE initiatives are to: Support a professional level of regulatory expertise through employee participation in well-developed regulatory programs presented by credible experts. Encourage a constructive state regulatory environment founded on communication and cooperation. CORE achieves these goals via five program levels: introductory basics, advanced learning, professional expertise, crossfunctional dialogues, and external idea exchanges

  2. Reversibility of Decisions and Retrievability of Radioactive Waste: An Overview of Regulatory Positions and Issues

    International Nuclear Information System (INIS)

    Ruiz-Lopez, Carmen; Pescatore, Claudio

    2015-02-01

    The Radioactive Waste Management Committee (RWMC) of the NEA has been at the forefront worldwide in examining the topic of Reversibility and Retrievability (R and R). As early as 2001, an NEA survey-based report entitled 'Reversibility and Retrievability in Geological Disposal of Radioactive Waste' provided an overview of R and R by an ad-hoc group of experts from 11 NEA Member countries. The 2001 report (NEA 2001) observed that national safety regulations dealt mainly with operational safety and design targets for long-term (post-closure) safety and relatively little consideration was given to retrievability/reversibility or its implications. Yet, policy frames saw benefits from retrievability. In 2007, the RWMC launched the NEA R and R project with participation from 15 countries and two international organisations. The project included, amongst its members, representatives of six organisations involved in regulation, five regulatory authorities of five countries and one technical support organisation to the safety authorities. The project aimed to improve awareness amongst the RWMC constituency of the breadth of issues and positions regarding the concepts of R and R with the goal of providing a neutral overview of relevant issues and viewpoints in OECD countries. Hence substantial attention was given to R and R regulatory issues mainly in the context of decision making for repository development. The report (NEA 2011) points out regulatory issues, including safety criteria and licensing considerations. The present document presents an overview of findings, positions, boundary conditions and issues based on the results of the R and R project of 2007-2011 (stepwise decision making and reversibility, regulatory authorisations and R and R, decision making for retrieval) and of the Reims conference of December 2010 (terminology and definitions, legal and policy context, motivations for R and R, practical aspects, stakeholders confidence aspects)

  3. Papers on the nuclear regulatory dilemma

    Energy Technology Data Exchange (ETDEWEB)

    Barkenbus, J.N.; Freeman, S.D.; Weinberg, A.M.

    1985-10-01

    The four papers contained in this report are titled: (1) From Prescriptive to Performance-Based Regulation of Nuclear Power; (2) Nuclear Regulatory Reform: A Technology-Forcing Approach; (3) Improving the Regulation of Nuclear Power; and (4) Science and Its Limits: The Regulators' Dilemma. These four papers investigate issues relating to the long-term regulation of nuclear energy. They were prepared as part of the Institute for Energy Analysis' project on Nuclear Regulation funded by a grant from the Mellon Foundation and a smaller grant by the MacArthur Foundation. Originally this work was to be supplemented by contributions from the Nuclear Regulatory Commission and from the Department of Energy. These contributions were not forthcoming, and as a result the scope of our investigations was more restricted than we had originally planned.

  4. Papers on the nuclear regulatory dilemma

    International Nuclear Information System (INIS)

    Barkenbus, J.N.; Freeman, S.D.; Weinberg, A.M.

    1985-10-01

    The four papers contained in this report are titled: (1) From Prescriptive to Performance-Based Regulation of Nuclear Power; (2) Nuclear Regulatory Reform: A Technology-Forcing Approach; (3) Improving the Regulation of Nuclear Power; and (4) Science and Its Limits: The Regulators' Dilemma. These four papers investigate issues relating to the long-term regulation of nuclear energy. They were prepared as part of the Institute for Energy Analysis' project on Nuclear Regulation funded by a grant from the Mellon Foundation and a smaller grant by the MacArthur Foundation. Originally this work was to be supplemented by contributions from the Nuclear Regulatory Commission and from the Department of Energy. These contributions were not forthcoming, and as a result the scope of our investigations was more restricted than we had originally planned

  5. Technical support to the Nuclear Regulatory Commission for the boiling water reactor blowdown heat transfer program

    International Nuclear Information System (INIS)

    Rice, R.E.

    1976-09-01

    Results are presented of studies conducted by Aerojet Nuclear Company (ANC) in FY 1975 to support the Nuclear Regulatory Commission (NRC) on the boiling water reactor blowdown heat transfer (BWR-BDHT) program. The support provided by ANC is that of an independent assessor of the program to ensure that the data obtained are adequate for verification of analytical models used for predicting reactor response to a postulated loss-of-coolant accident. The support included reviews of program plans, objectives, measurements, and actual data. Additional activity included analysis of experimental system performance and evaluation of the RELAP4 computer code as applied to the experiments

  6. Regulatory Guidance for Lightning Protection in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kisner, Roger A.; Wilgen, John B.; Ewing, Paul D.; Korsah, Kofi; Antonescu, Christina E.

    2006-01-01

    Oak Ridge National Laboratory (ORNL) was engaged by the U.S. Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) to develop the technical basis for regulatory guidance to address design and implementation practices for lightning protection systems in nuclear power plants (NPPs). Lightning protection is becoming increasingly important with the advent of digital and low-voltage analog systems in NPPs. These systems have the potential to be more vulnerable than older analog systems to the resulting power surges and electromagnetic interference (EMI) when lightning strikes facilities or power lines. This paper discusses the technical basis for guidance to licensees and applicants covered in Regulatory Guide (RG) 1.204, Guidelines for Lightning Protection of Nuclear Power Plants, issued August 2005. RG 1.204 describes guidance for practices that are acceptable to the NRC staff for protecting nuclear power structures and systems from direct lightning strikes and the resulting secondary effects.

  7. An Evaluation Methodology Development and Application Process for Severe Accident Safety Issue Resolution

    Directory of Open Access Journals (Sweden)

    Robert P. Martin

    2012-01-01

    Full Text Available A general evaluation methodology development and application process (EMDAP paradigm is described for the resolution of severe accident safety issues. For the broader objective of complete and comprehensive design validation, severe accident safety issues are resolved by demonstrating comprehensive severe-accident-related engineering through applicable testing programs, process studies demonstrating certain deterministic elements, probabilistic risk assessment, and severe accident management guidelines. The basic framework described in this paper extends the top-down, bottom-up strategy described in the U.S Nuclear Regulatory Commission Regulatory Guide 1.203 to severe accident evaluations addressing U.S. NRC expectation for plant design certification applications.

  8. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-05-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-000] Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to be effective 4/15/2011. Any person...

  9. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    Science.gov (United States)

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-001] Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to Compliance Filing to be effective 4/15/2011. Any...

  10. Regulatory and technical reports: compilation for third quarter 1982 July-September

    International Nuclear Information System (INIS)

    1982-11-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC's intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, and NUREG/CR-XXXX. This precede the following indexes: Contractor Report Number Index; Personal Author Index; Subject Index; NRC Originating Organization Index (Staff Reports); NRC Contract Sponsor Index (Contractor Reports); Contractor Index; and Licensed Facility Index

  11. A study on the regulatory approach of major technical issues

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Keun Sun; Oh, S. H.; Kang, H. J.; Kim, G. S. [Sunmoon Univ., Asan (Korea, Republic of); Lee, S. H.; Baek, W. P.; Yang, S. H.; Jeong, Y. H. [Korea Association for Nuclear Technology, Taejon (Korea, Republic of)

    1999-02-15

    This project is to provide the regulatory direction of 4 major technical issues for the Korean Next Generation Reactors, which are parts of major technical issues resulted from the safety regulation R and D on the KNGR. The outstanding results are are as follows : related to the classification and acceptance criteria of plant conditions, currently used classification and safety requirement were reviewed and regulatory direction was proposed. Among multiple failures, it is identified that SBO, TLOFW, multiple SGTR and ATWS are basically to be considered for additional requirements for advanced reactors. This study reviewed risk aspects, design consideration, and trends of safety requirements, and proposed fundamental safety requirements to be applied for KNGR. Multiple steam generator tube failure is a significant safety concern because of the possibility of release of radionuclides to the environment through containment bypass. Proposed safety requirement for this event can be categorized mainly as analysis requirement, design evaluation requirement and PSA requirement; For protection of containment failure, a reasonable safety position is necessary through and integrated review of possibility of severe accident occurrence, effects of sever accident mitigation features and cost effects of these design features. With this consideration safety requirements developed are the analysis requirement, provision of protective measures and survivability/availability of protective measures.

  12. Nuclear Regulatory legislation

    International Nuclear Information System (INIS)

    1984-06-01

    This compilation of statutes and material pertaining to nuclear regulatory legislation through the 97th Congress, 2nd Session, has been prepared by the Office of the Executive Legal Director, U.S. Nuclear Regulatory Commission, with the assistance of staff, for use as an internal resource document

  13. Anatomy of a cogeneration deal : natural gas contracts and regulatory issues

    International Nuclear Information System (INIS)

    Brett, J.T.

    1999-01-01

    The special features of gas contracts for cogeneration projects were discussed. It was recommended that a gas power purchase contract should be entered early in a project development cycle to justify requests for new pipeline facilities. Issues regarding buyer's commitments, market prices, and volumes were also discussed. In the event of failure to deliver, the contract should include provisions which would make it possible to source gas elsewhere, terminate the contract or seek damages. This paper also discussed various pricing provisions in a gas commodity contract, security of supplies, gas transportation arrangements, regulatory considerations, outstanding issues, and IMO (independent market operator) requirements

  14. Securities and Exchange Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...: Alicia Goldin, Division of Trading and Markets, Securities and Exchange Commission, 100 F Street NE... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...

  15. Corporate Political Strategies related to Decisions of European Competition Commission on Regulatory Issues in the European Telecommunications Industry

    NARCIS (Netherlands)

    Kranenburg, H.L. van; Ross, T.

    2014-01-01

    The European regulatory institution has the tasks to protect fair competition and equal opportunities for all companies in the European telecommunications industry and to protect the welfare of the consumers. This regulator is responsible for the adherence of telecommunications companies to

  16. Nuclear Regulatory Commission issuances, September 1988

    International Nuclear Information System (INIS)

    1988-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  17. Federal Trade Commission Semiannual Regulatory Agenda

    Science.gov (United States)

    2010-12-20

    ...) Retail Food Store Advertising and Marketing Practices, 16 CFR 424; (8) the Negative Option Rule, 16 CFR... Deregulatory Actions includes The Regulatory Plan, which appears in both the online Unified Agenda and in part... available online at www.reginfo.gov , in a format that offers users a greatly enhanced ability to obtain...

  18. Regulatory and technical reports, compilation for 1979. Volume 4. Bibliographical report Jan-Dec 79

    International Nuclear Information System (INIS)

    Oliu, W.E.; McKenzie, L.; Aragon, R.

    1980-07-01

    The compilation lists formal regulatory and technical reports issued in 1979 by the U.S. Nuclear Regulatory Commission (NRC) staff and by NRC contractors. The compilation is divided into three major sections. The first major section consists of a sequential listing of all NRC reports in report-number order. The first portion of this sequential section lists staff reports, the second portion lists NRC-sponsored conference proceedings, and the third lists contractor reports. Each report citation in the sequential section contains full bibliographic information

  19. Indexes to Nuclear Regulatory Commission issuances, January 19, 1975 through December 31, 1979

    International Nuclear Information System (INIS)

    1981-03-01

    The document contains indexes for adjudicatory decisions of the Commission (CLI), the Atomic Safety and Licensing Appeal Board (ALAB), the Atomic Safety and Licensing Board (LBP), the Administrative Law Judge (ALJ), the Directors Denials (DD), and the Denials of Petitions for Rulemaking (DPRM). The Directors Denials and Denials of Petition for Rulemaking are new categories, added in 1979. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); Name of facility, Docket number; Type of hearing (for construction permit, operating license, etc.); Issues raised by appellants; Issuance number; Type of issuance (memorandum, order, decision, etc.); Issuance pagination; Legal citations (cases, regulations, and statutes); and Subject matter of issues and/or rulings. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; Digests and headers; Legal citation index; Subject index; and Facility index

  20. Waste management regulatory compliance issues related to D ampersand D activities at Oak Ridge National Laboratory (ORNL)

    International Nuclear Information System (INIS)

    Hitch, J.P.; Arnold, S.E.; Burwinkle, T.; Daugherty, D.

    1994-01-01

    The waste management activities at ORNL related to the decontamination and decommissioning (D ampersand D) of radioactively contaminated buildings are divided into four categories: Operational facilities, inactive or surplus facilities, future facilities planning, and D ampersand D activities. This paper only discusses regulatory issues related to inactive or surplus facilities. Additionally, rather than attempting to address all resulting waste streams and related regulations, this paper highlights only a few of the ORNL waste streams that present key regulatory issues