WorldWideScience

Sample records for regulating operations providing

  1. Operation and Management of Thermostatically Controlled Loads for Providing Regulation Services to Power Grids

    Science.gov (United States)

    Vanouni, Maziar

    optimization model for a load aggregator (LA) to participate in the performance-based regulation markets (PBRM). PBRMs are the recently developed and practiced regulation market structure recommended by Federal Energy Regulatory Commission (FERC) in 2011. In PBRMs, regulation resources are paid based on both regulation capacity bids and the regulation performance including the provided mileage and the performance accuracy. In order to develop the income from the PBRM, the convention of California Independent System Operator (CAISO) is used. In the presented optimization model, the amount of tear-and-wear imposed on the TCLs are confined to prevent abrupt switching of TCLs. In Chapter 5, a two-stage reward allocation mechanism is developed for a LA recruiting TCLs for regulation service provision. The mechanism helps the LA to distribute the total reward (earned from regulation service provision) among the TCLs according to their contribution in the whole provided service. In the first stage, TCLs are prioritized based on their service provision capability. In order to do so, an index called SPCI is presented to quantify TCLs capability/flexibility and therefore, prioritize them. After prioritization TCLs a priority list is constructed in the first stage. In the second stage, a reward curve is constructed representing the functionality of the possible total reward with respect to the number top TCLs in the priority list. Then, the allocated reward to individual TCLs is calculated by applying the incremental method on the constructed reward curve. This presented reward allocation mechanism is based on the definition of maximum service capacity (MSC) for a control group including TCLs. MSC is defined and its calculation method is presented before discussing the two stages of the reward allocation mechanism. The numerical results proves the suitability of the proposed prioritization method as it is observed the TCLs with higher rankings can contribute more to the total reward in

  2. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    1980-09-01

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions [sr

  3. Providing current radiation safety according to new version of 'Ukrytie' object regulation

    International Nuclear Information System (INIS)

    Borovoj, A.A.; Vysotskij, E.D.; Krinitsyn, A.P.; Bogatov, S.A.

    1999-01-01

    Main provisions are given of the 'Ukryttia' object's Regulation related to provision of radiation safety during the object's operation. The safety is provided due to the realization by the object's personnel of functions of global monitoring of current radiation conditions, as well as of the measures of operative or preventive suppression of radiation abnormalities sources

  4. The French Space Operation Act: Technical Regulations

    Science.gov (United States)

    Trinchero, J. P.; Lazare, B.

    2010-09-01

    The French Space Operation Act(FSOA) stipulates that a prime objective of the National technical regulations is to protect people, property, public health and the environment. Compliance with these technical regulations is mandatory as of 10 December 2010 for space operations by French space operators and for space operations from French territory. The space safety requirements and regulations governing procedures are based on national and international best practices and experience. A critical design review of the space system and procedures shall be carried out by the applicant, in order to verify compliance with the Technical Regulations. An independent technical assessment of the operation is delegated to CNES. The principles applied when drafting technical regulations are as follows: requirements must as far as possible establish the rules according to the objective to be obtained, rather than how it is to be achieved; requirements must give preference to international standards recognised as being the state of the art; requirements must take previous experience into account. Technical regulations are divided into three sections covering common requirements for the launch, control and return of a space object. A dedicated section will cover specific rules to be applied at the Guiana Space Centre. The main topics addressed by the technical regulations are: operator safety management system; study of risks to people, property, public health and the Earth’s environment; impact study on the outer space environment: space debris generated by the operation; planetary protection.

  5. 77 FR 22216 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-04-13

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... schedule that governs the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The... River, at Sacramento, CA. The Tower Drawbridge navigation span provides a vertical clearance of 30 feet...

  6. 78 FR 42452 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2013-07-16

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation... Sacramento, CA. The deviation is necessary to allow the bridge owner to make bridge repairs. This deviation... Sacramento, CA. The drawbridge navigation span provides 109 feet vertical clearance above Mean High Water in...

  7. 75 FR 16006 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2010-03-31

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.4, at Sacramento, CA. The deviation is necessary to allow the bridge owner to make bridge... Sacramento River, at Sacramento, CA. The I Street Drawbridge navigation span provides 109 feet vertical...

  8. 76 FR 26181 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-05-06

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the Hope... Drawbridge, mile 59.0, over Sacramento River, at Sacramento, CA. The drawbridge navigation span provides a...

  9. A logic scheme for regulating safe operation of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, E E [Reactor Department, Nuclear Research Center, Atomic Energy Authority, Cairo (Egypt); Effat, A; Rahman, F A [Operational Saety Dept, National Center of Nuclear Safety and Radiation Control Atomic Energy Authority, Cairo (Egypt)

    1997-12-31

    This investigation presents a logic scheme for regulating the safe operation of research reactor in accordance with the new revision of SS-35 and revised by the 10 CFR. It emphasizes the regulatory inspection and enforcement (RI end E) during the reactor operation phase. IT is developed to provide information, guidance and recommendations to be taken when constructing the RI and E program that could be applied to the operational phase of the egyptian Research Reactors. In the operational phase, the regulatory inspection (RI) means an examination, observation, measurement, or test undertaken or on behalf of the nuclear regulatory body (NRB) during operation to verify that the nuclear materials, components, systems and structures as well operational activities, processes, procedures and personnel competence and performance are in accordance with the requirements established or the provisions approved by NRB or specified in the operational license or contained in regulations. Regulatory inspection includes both routine and non-routine ones. Any of them may be announced or unannounced. The problems identified by the RI must be resolved by the proper RE actions. The RE actions include investigative and corrective RE actions. These RI and E procedures for regulating safe operation of research reactors are presented as flow charts and then developed as a computer logic scheme. The software program is very efficient, very friendly, very simple and is interactive in nature such that the program asks the user certain questions about essential steps that guide the (RI and E) for research reactors, and user responds. The program proceeds based on this response until all the necessary steps for (RI and E) are accomplished. 5 figs.

  10. Operator/regulator interface: Organizational structure and responsibilities

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, J S [American Electric Power Service Corp. (United States)

    1997-09-01

    In the context of promotion of safety culture for the nuclear power plants the following aspects are briefly described: operator/regulator interface regulatory organization; policy making body; operating organization; regulatory interface.

  11. Research on Cascade Reservoirs’ Short-Term Optimal Operation under the Effect of Reverse Regulation

    Directory of Open Access Journals (Sweden)

    Changming Ji

    2018-06-01

    Full Text Available Currently research on joint operation of a large reservoir and its re-regulating reservoir focuses on either water quantity regulation or water head regulation. The accuracy of relevant models is in need of improvement if the influence of factors such as water flow hysteresis and the aftereffect of tail water level variation are taken into consideration. In this paper, given the actual production of Pankou-Xiaoxuan cascade hydropower stations that combines two operation modes (‘electricity to water’ and ‘water to electricity’, a coupling model of their short-term optimal operation is developed, which considers Xiaoxuan reservoir’s regulating effect on Pankou reservoir’s outflow volume and water head. Factors such as water flow hysteresis and the aftereffect of tail water level variation are also considered to enhance the model’s accuracy. The Backward Propagation (BP neural network is employed for precise calculation of the downstream reservoir’s inflow and the upstream reservoir’s tail water level. Besides, we put forth Accompanying Progressive Optimality Algorithm (APOA to solve the coupling model with aftereffect. An example is given to verify the scientificity of the proposed model and the advantages of APOA. Through analysis of the model calculation results, the optimal operation rules of the cascade reservoirs are obtained in terms of water quantity regulation and water head regulation, which can provide scientific reference for cascade reservoirs’ optimal operation.

  12. Regulations and instructions for RA reactor operation

    International Nuclear Information System (INIS)

    1989-01-01

    This regulatory guide consists of following 4 chapters: Description of the RA reactor, organization scheme, regulations for performing experiments; Regulations for staff on duty; Instructions for operating the vacuum systems, heavy water and helium systems; and evacuation in case of accident [sr

  13. 78 FR 46781 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-08-01

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... the Federal Acquisition Regulation (FAR) to revise the definition of ``contingency operation'' to... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  14. 76 FR 50123 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2011-08-12

    ... temporary deviation from the regulation governing the operation of the Hack Freight Bridge, mile 3.1, across...-9826. SUPPLEMENTARY INFORMATION: The Hack Freight Bridge, across the Hackensack River at mile 3.1 has a... to provide openings. Under this temporary deviation the Hack Freight Bridge, mile 3.1, across the...

  15. Regulations for RA reactor operation; Propisi nuklearnog reaktora 'RA'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-09-15

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions. [Serbo-Croat] Propisi o radu nuklearnog reaktora RA pisani su tako da svi zakonski propisi definisani 'Zakonom o zastiti od jonizujuceg zracenja' i pratecim propisima (devet pravilnika) kao i tehnicke norme prema preporukama MAAE budu postovani u punoj meri pri radu reaktora. Sadrzaj ove knjige obuhvata: osnovne podatke o reaktoru; zakonske propise; organizaciju rada reaktora RA; opste propise o rezimu rada, kretanju u zgradi reaktora, izvodjenju eksperimenata; pogonske propise za rad u normalnom rezimu i u slucaju udesa.

  16. 78 FR 69803 - Drawbridge Operation Regulations; Gulf Intracoastal Waterway, Venice, FL

    Science.gov (United States)

    2013-11-21

    ...-AA09 Drawbridge Operation Regulations; Gulf Intracoastal Waterway, Venice, FL AGENCY: Coast Guard, DHS... that governs the Hatchett Creek (US-41) Twin Bridges, Gulf Intracoastal Waterway mile 56.9, Venice, FL... mile 56.9 at Venice, FL as listed in Sec. 117.287(b), provides the draw of the Hatchett Creek (US-41...

  17. 78 FR 13765 - Federal Acquisition Regulation; Definition of Contingency Operation

    Science.gov (United States)

    2013-02-28

    ... Federal Acquisition Regulation; Definition of Contingency Operation AGENCY: Department of Defense (DoD... Regulation (FAR) to revise the definition of ``contingency operation'' to address the statutory change to the... ``contingency operation'' at FAR 2.101 in accordance with the statutory change to the definition made by...

  18. 75 FR 55475 - Drawbridge Operation Regulation; Pequonnock River, Bridgeport, CT

    Science.gov (United States)

    2010-09-13

    ... removing the operation regulations for two moveable draw bridges that no longer have moveable spans. Under..., Connecticut. The moveable spans for both bridges were removed and the drawbridge operation regulations are no... operation of two bridges, the Congress Street Bridge at mile 0.4, and the Grand Street Bridge at mile 0.9...

  19. 75 FR 66306 - Drawbridge Operation Regulation; Arkansas Waterway, Little Rock, AR

    Science.gov (United States)

    2010-10-28

    ...-AA09 Drawbridge Operation Regulation; Arkansas Waterway, Little Rock, AR AGENCY: Coast Guard, DHS... Arkansas Waterway at Mile 119.6 at Little Rock, Arkansas. Vessel operators shall contact the remote... Drawbridge Operation Regulation; Arkansas Waterway, Little [[Page 66307

  20. Providing frequency regulation reserve services using demand response scheduling

    International Nuclear Information System (INIS)

    Motalleb, Mahdi; Thornton, Matsu; Reihani, Ehsan; Ghorbani, Reza

    2016-01-01

    Highlights: • Proposing a market model for contingency reserve services using demand response. • Considering transient limitations of grid frequency for inverter-based generations. • Price-sensitive scheduling of residential batteries and water heaters using dynamic programming. • Calculating the profits of both generation companies and demand response aggregators. - Abstract: During power grid contingencies, frequency regulation is a primary concern. Historically, frequency regulation during contingency events has been the sole responsibility of the power utility. We present a practical method of using distributed demand response scheduling to provide frequency regulation during contingency events. This paper discusses the implementation of a control system model for the use of distributed energy storage systems such as battery banks and electric water heaters as a source of ancillary services. We present an algorithm which handles the optimization of demand response scheduling for normal operation and during contingency events. We use dynamic programming as an optimization tool. A price signal is developed using optimal power flow calculations to determine the locational marginal price of electricity, while sensor data for water usage is also collected. Using these inputs to dynamic programming, the optimal control signals are given as output. We assume a market model in which distributed demand response resources are sold as a commodity on the open market and profits from demand response aggregators as brokers of distributed demand response resources can be calculated. In considering control decisions for regulation of transient changes in frequency, we focus on IEEE standard 1547 in order to prevent the safety shut-off of inverter-based generation and further exacerbation of frequency droop. This method is applied to IEEE case 118 as a demonstration of the method in practice.

  1. 78 FR 23489 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2013-04-19

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation... operating regulation that governs the Tower Drawbridge across Sacramento River, mile 59.0, at Sacramento, CA... Tower Drawbridge, mile 59.0, over Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation...

  2. 78 FR 15879 - Drawbridge Operation Regulations; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2013-03-13

    ... Operation Regulations; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of... operating regulation that governs the Tower Drawbridge across the Sacramento River, mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the First Annual ``Biggest...

  3. 76 FR 13312 - Drawbridge Operation Regulations; Fox River, Oshkosh, WI

    Science.gov (United States)

    2011-03-11

    ...-AA09 Drawbridge Operation Regulations; Fox River, Oshkosh, WI AGENCY: Coast Guard, DHS. ACTION: Notice... National Railway Bridge across the Fox River at Mile 55.72 at Oshkosh, Wisconsin. After careful... On December 8, 2010, we published an NPRM entitled Drawbridge Operation Regulation; Fox River...

  4. 77 FR 45247 - Drawbridge Operation Regulations; Gallants Channel, Beaufort, NC

    Science.gov (United States)

    2012-07-31

    ... to accommodate the Neuse River Keeper Foundation Sprint Triathlon. DATES: This deviation is effective... operating regulations to accommodate the Neuse River Keeper Foundation Sprint Triathlon. Under the current... designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35...

  5. A regulator`s perspective on NRC`s participation in the operations & maintenance committees

    Energy Technology Data Exchange (ETDEWEB)

    Wessman, R.H.

    1996-12-01

    As a regulator fairly new to the American Society of Mechanical Engineers (ASME) Operations and Maintenance (O&M) Committee process, the author does not have a personal historical perspective as do many of the longer-term, and highly respected, members of the O&M Committee. However, as Branch Chief of the Mechanical Engineering Branch, Division of Engineering, in the Office of Nuclear Reactor Regulation at the NRC for just over two years, he has responsibility for the regulatory agency`s review of licensee actions involving the products that come from the efforts of the O&M Committee, as well as responsibility for portions of the activities of interest to other ASME Code groups such as Section III, Section XI, and Qualification of Mechanical Equipment. As a result, the author has learned a great deal about the code process in a short time. Here he gives his perspectives on the process and provides a few thoughts on the direction for the future.

  6. 77 FR 10960 - Drawbridge Operation Regulation; Snake Creek, Islamorada, FL

    Science.gov (United States)

    2012-02-24

    ... Operation Regulation; Snake Creek, Islamorada, FL AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of Snake Creek Bridge, mile 0.5, across Snake Creek... schedule of Snake Creek Bridge in Islamorada, Florida. This deviation will result in the bridge opening...

  7. 77 FR 63725 - Drawbridge Operation Regulations; Old River, Orwood, CA

    Science.gov (United States)

    2012-10-17

    ... BNSF Middle River drawbridge as an alternative path for navigation. DATES: The temporary deviation... Operation Regulation; Old River, Orwood CA'' in the Federal Register (77 FR 58491). The temporary deviation... Operation Regulations; Old River, Orwood, CA AGENCY: Coast Guard, DHS. ACTION: Notice of cancellation of a...

  8. 77 FR 21864 - Drawbridge Operation Regulation; Saginaw River, Bay City, MI

    Science.gov (United States)

    2012-04-12

    ...-AA09 Drawbridge Operation Regulation; Saginaw River, Bay City, MI AGENCY: Coast Guard, DHS. ACTION... Lafayette Street Bridge at mile 6.78, all over the Saginaw River at Bay City, MI. The previous regulation... Operation Regulation; Saginaw River, Bay City, MI, in the Federal Register (76 FR 76637). We received one...

  9. 77 FR 52599 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-08-30

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... regulation that governs the Tower Drawbridge across Sacramento River, mile 59.0, at Sacramento, CA. The... change to the operation of the Tower Drawbridge, mile 59.0, over Sacramento River, at Sacramento, CA. The...

  10. Regulation for installation and operation of marine reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The regulation is defined under the law for the regulations of nuclear source materials, nuclear fuel materials and reactors and the provisions of the order for execution of the law. The regulation is applied to marine reactors and reactors installed in foreign nuclear ships. Basic concepts and terms are explained, such as: radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; safeguarded area; inspected surrounding area and employee. The application for permission of installation of reactors shall list maximum continuous thermal power, location and general structure of reactor facilities, structure and equipment of reactors and treatment and storage facilities of nuclear fuel materials, etc. The application for permission of reactors installed in foreign ships shall describe specified matters according to the provisions for domestic reactors. The operation program of reactors for three years shall be filed to the Minister of Transportation for each reactor every fiscal year from that year when the operation is expected to start. Records shall be made for each reactor and kept for particular periods on inspection of reactor facilities, operation, fuel assembly, control of radiation, maintenance and others. Exposure doses, inspection and check up of reactor facilities, operation of reactors, transport and storage of nuclear fuel materials, etc. are designated in detail. (Okada, K.)

  11. Operating nuclear power stations in a regulated cyber security environment: a roadmap for success

    Energy Technology Data Exchange (ETDEWEB)

    Dorman, E., E-mail: Erik.Dorman@areva.com [AREVA Inc., Cyber Security Solutions, Charlotte, NC (United States)

    2015-07-01

    The United States Nuclear Regulatory Commission (NRC) issued 10CFR73.54 to implement a regulated Cyber Security Program at each operating nuclear reactor facility. Milestones were implemented December 31, 2012 to mitigate the attack vectors for the most critical digital assets acknowledged by the industry and the NRC. The NRC inspections have begun. The nuclear Cyber Security Plan, implemented by the site Cyber Security Program (Program), is an element of the operating license at each facility. The Program is designed to protect critical digital assets (CDAs) by applying and maintaining defense-in depth protective strategies to ensure the capability to detect, respond to, and recover from cyber-attacks. The Program references NEI 08-09 R. 6, the Nuclear Energy Institute Template that provides guidance for applying Cyber Security controls derived from NIST 800-53/82 and slightly modified to fit the nuclear environment. Many mature processes are in place at nuclear facilities in response to numerous regulations implemented over the past 30 years. Many of these processes such as the Physical Security Program offer protections that are leveraged to protect the functions of critical digital assets from unauthorized physical access. Other processes and technology such as engineering design control, work management and pre-job briefs, control of portable media and mobile devices, and deterministically segregated networks protect critical digital assets. By leveraging the regulated nuclear environment, integrating NIST type Cyber Security controls, and prudently deploying technology the Cyber Security posture of operating nuclear facilities supports on-demand base load electricity 24/7 with capacity factors exceeding 85%. This paper is designed to provide a glimpse into Cyber Security Programs that support safe operation and reliability in the regulated nuclear environment while supporting the on-demand base load electricity production 24/7. (author)

  12. Operating nuclear power stations in a regulated cyber security environment: a roadmap for success

    International Nuclear Information System (INIS)

    Dorman, E.

    2015-01-01

    The United States Nuclear Regulatory Commission (NRC) issued 10CFR73.54 to implement a regulated Cyber Security Program at each operating nuclear reactor facility. Milestones were implemented December 31, 2012 to mitigate the attack vectors for the most critical digital assets acknowledged by the industry and the NRC. The NRC inspections have begun. The nuclear Cyber Security Plan, implemented by the site Cyber Security Program (Program), is an element of the operating license at each facility. The Program is designed to protect critical digital assets (CDAs) by applying and maintaining defense-in depth protective strategies to ensure the capability to detect, respond to, and recover from cyber-attacks. The Program references NEI 08-09 R. 6, the Nuclear Energy Institute Template that provides guidance for applying Cyber Security controls derived from NIST 800-53/82 and slightly modified to fit the nuclear environment. Many mature processes are in place at nuclear facilities in response to numerous regulations implemented over the past 30 years. Many of these processes such as the Physical Security Program offer protections that are leveraged to protect the functions of critical digital assets from unauthorized physical access. Other processes and technology such as engineering design control, work management and pre-job briefs, control of portable media and mobile devices, and deterministically segregated networks protect critical digital assets. By leveraging the regulated nuclear environment, integrating NIST type Cyber Security controls, and prudently deploying technology the Cyber Security posture of operating nuclear facilities supports on-demand base load electricity 24/7 with capacity factors exceeding 85%. This paper is designed to provide a glimpse into Cyber Security Programs that support safe operation and reliability in the regulated nuclear environment while supporting the on-demand base load electricity production 24/7. (author)

  13. The Empirical Analysis of the Impact of Bank Capital Regulations on Operating Efficiency

    Directory of Open Access Journals (Sweden)

    Josephat Lotto

    2018-03-01

    Full Text Available This paper principally aims at examining the impact of capital requirements regulation on bank operating efficiency in Tanzania. The study employs bank level data for the period between 2009 and 2015. The findings show a positive and significant relationship between capital ratio and bank operating efficiency. This shows that commercial banks in Tanzania with more stringent capital regulations are more operationally efficient. This relationship proposes that capital adequacy does not only strengthen financial stability by providing a larger capital cushion but also improves bank operating efficiency by preventing a moral hazard problem between shareholders and debt-holders. This result may also imply that the increased regulations on capital requirements influence the bank’s decision to revisit their internal operations strategy in terms of strong corporate governance, risk assessment methods, credit evaluation procedures, employment of more qualified staffs, and enhanced internal control procedures. Another key finding is an inverse relationship between non-performing Loans (credit risk and bank operating efficiency. The implication of this relationship may simply mean that the bank’s total loan and advances in combination with total deposit either due from customers or from other banks are of little importance in determining the operational efficiency of banks. This probably implies that the amount of money banks loan out is too excessive, which would attract a greater chance of default. The paper lays down some recommendations: first, banks in Tanzania are advised to invest in more advanced technological innovations to reduce the staff costs and other operating expenses to increase their operational efficiency; and, second, bank management is also advised to be more careful in the loan screening process to reduce the incidence of non-performing loans.

  14. Estimation of regulated term of technical systems further operation

    International Nuclear Information System (INIS)

    Strel'nikov, V.P.

    2008-01-01

    The technique of estimating the regulated term of technical systems further operation on the basis of data on failures during operation and use of probabilistic-physical model of failures (DN-distribution) is proposed

  15. 75 FR 76632 - Drawbridge Operation Regulation; Upper Mississippi River, Hannibal, MO

    Science.gov (United States)

    2010-12-09

    ... Operation Regulation; Upper Mississippi River, Hannibal, MO AGENCY: Coast Guard, DHS. ACTION: Notice of... temporary deviation from the regulation governing the operation of the Hannibal Railroad Drawbridge across the Upper Mississippi River, mile 309.9, at Hannibal, Missouri. The deviation is necessary to allow...

  16. 76 FR 60733 - Drawbridge Operation Regulations; Narrow Bay, Smith Point, NY

    Science.gov (United States)

    2011-09-30

    ... Operation Regulations; Narrow Bay, Smith Point, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Smith Point Bridge, 6.1, across Narrow Bay, between Smith Point and Fire Island, New York. The deviation is necessary to facilitate bridge...

  17. Regulations and instructions for RB reactor operation; Propisi i uputstva za rad reaktora RB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-07-01

    This document includes regulations for reactor RB operation, behaviour and presence of staff in the reactor building; regulations for performing experiments at the RB reactor, regulations and int ructions for the reactor operators and other staff on duty. A chapter is devoted to instruction for reactor operation with the operating documentation and special duties of the operators. Regulations and instruction concerned with accidents are described with classification of accidents and evacuation plan. Annexes to this document include: the present status of the reactor; program for training the reactor operators; forms which are obligatory to be signed for any operating activity, and the certificate of the RB reactor lattice.

  18. 77 FR 6465 - Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT

    Science.gov (United States)

    2012-02-08

    ... Operation Regulations; Connecticut River, Old Lyme, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Old Saybrook-Old Lyme RR Bridge, mile 3.4, across the Connecticut River at Old Lyme, Connecticut. The deviation is necessary to facilitate bridge...

  19. 76 FR 47440 - Drawbridge Operation Regulations; Passaic River, Jersey City, NJ

    Science.gov (United States)

    2011-08-05

    ... Operation Regulations; Passaic River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Route 1 & 9 Bridge across the Passaic River, mile 1.8, at Jersey City, New Jersey. The deviation is necessary to facilitate bridge painting...

  20. 76 FR 4819 - Drawbridge Operation Regulations; Passaic River, Jersey City, NJ

    Science.gov (United States)

    2011-01-27

    ... Operation Regulations; Passaic River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Route 1 & 9 Bridge across the Passaic River, mile 1.8, at Jersey City, New Jersey. The deviation is necessary for bridge painting. This deviation...

  1. 'No, the government doesn't need to, it's already self-regulated': a qualitative study among vape shop operators on perceptions of electronic vapor product regulation.

    Science.gov (United States)

    Nayak, Pratibha; Barker, Dianne C; Huang, Jidong; Kemp, Catherine B; Wagener, Theodore L; Chaloupka, Frank

    2018-03-26

    While the market share of electronic vapor products (EVPs), sold primarily through vape shops and other outlets, has increased rapidly, these products remained largely unregulated until 2016. This study, conducted prior to announcement of the deeming regulations, provides insights into vape shop operator attitudes toward potential government regulations of EVPs. In 2015, we conducted 37 in-person interviews of vape shop operators across nine US cities. Shops were identified through extensive web-searches. We used QSR International's NVivo 11 qualitative data analysis software to analyze the transcripts. Many vape shop operators viewed regulations requiring safe production of e-liquids, child-resistant bottles and listing e-juice ingredients as acceptable. They disagreed with the elimination of free samples and bans on flavored e-liquid sales, which generate significant revenue for their stores. Many held negative perceptions of pre-market review of new product lines and EVP-specific taxes. All agreed that EVPs should not be sold to minors, but most felt that owners should not be fined if minors visited vape shops. Findings from this study offer insights into the acceptability of proposed regulations, as well as barriers to effective regulation implementation.

  2. 75 FR 62469 - Drawbridge Operation Regulations; Charles River, Boston, MA, Maintenance

    Science.gov (United States)

    2010-10-12

    ... Operation Regulations; Charles River, Boston, MA, Maintenance AGENCY: Coast Guard, DHS. ACTION: Notice of... Craigie Bridge across the Charles River at mile 1.0, has a vertical clearance of 10.25 feet at normal pool... temporary deviation from the regulation governing the operation of the Craigie Bridge across the Charles...

  3. 75 FR 30299 - Drawbridge Operation Regulations; Fox River, Green Bay, WI

    Science.gov (United States)

    2010-06-01

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-0374] Drawbridge Operation Regulations; Fox River, Green Bay, WI AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... from the regulation governing the operation of the Main Street Bridge at Mile 1.21 over the Fox River...

  4. 78 FR 23845 - Drawbridge Operation Regulations; Narrow Bay, Smith Point, NY

    Science.gov (United States)

    2013-04-23

    ... Operation Regulations; Narrow Bay, Smith Point, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Smith Point Bridge, mile 6.1, across Narrow Bay, between Smith Point and Fire Island, New York. The deviation is necessary to facilitate the Smith Point...

  5. Field tests experience from 1.6MW/400kWh Li-ion battery energy storage system providing primary frequency regulation service

    DEFF Research Database (Denmark)

    Swierczynski, Maciej Jozef; Stroe, Daniel Ioan; Stan, Ana-Irina

    2013-01-01

    Lithium-ion battery energy storage systems (BESSs) represent suitable alternatives to conventional generating units for providing primary frequency regulation on the Danish market. This paper presents aspects concerning the operation of the BESSs in the Danish energy market while providing upwards...... on the BESS demonstrator located in Western Denmark and initial results are introduced and discussed. These measurements can be used to validate models for battery ageing during realistic operation or to develop the diagnostic tools for the BESS....

  6. 78 FR 13479 - Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT

    Science.gov (United States)

    2013-02-28

    ...-AA09 Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT AGENCY: Coast... regulations that govern the operation of three bridges across the Quinnipiac and Mill Rivers at New Haven...) entitled ``Drawbridge Operation Regulations New Haven Harbor, Quinnipiac and Mill Rivers,'' in the Federal...

  7. 78 FR 67084 - Drawbridge Operation Regulation; Broad Creek, Laurel, DE

    Science.gov (United States)

    2013-11-08

    ...-AA09 Drawbridge Operation Regulation; Broad Creek, Laurel, DE AGENCY: Coast Guard, DHS. ACTION: Notice....25, both at Laurel, DE. The proposed new rule would change the current regulation by requiring a..., mile 8.2, all at Laurel, shall open on signal if at least 48 hours notice is given. Previous regulation...

  8. 78 FR 22423 - Drawbridge Operation Regulations; Taunton River, Fall River and Somerset, MA

    Science.gov (United States)

    2013-04-16

    ... Operation Regulations; Taunton River, Fall River and Somerset, MA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulation. SUMMARY: The Coast Guard is issuing a temporary deviation from the regulation governing the operation of the Brightman Street Bridge across the Taunton River...

  9. 78 FR 15878 - Drawbridge Operation Regulations; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2013-03-13

    ... Operation Regulations; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Tower Drawbridge across Sacramento River, mile 59.0, at Sacramento, CA... temporary change to the operation of the Tower Drawbridge, mile 59.0, over Sacramento River, at Sacramento...

  10. Regulations providing for the inspection of gamma radiography equipment

    International Nuclear Information System (INIS)

    1981-01-01

    Pursuant to the 1938 Act on X-rays and radium, etc and the 1976 regulations on supervision and use of installations and apparatus which release radiation representing a hazard to health, the State Institute of Radiation Health issued these regulations providing for a system of periodic inspections of gamma radiography equipment for radiation protection purposes. They entered into force on 1 July 1981 [fr

  11. Globalization of environmental regulations for offshore E & P operations

    Energy Technology Data Exchange (ETDEWEB)

    Shannon, B.E.

    1995-12-31

    One of the enduring legacies of the Rio Environmental Summit of 1992 (United Nations Conference on Environment and Development, UNCED) is Agenda 21 (Chapter 17 - Protection of the Oceans), which among other things called for the assessment of the need for a global authority to regulate offshore Exploration & Production (E&P) discharges, emissions and safety. Despite advice to the contrary from the International Maritime Organization (IMO), interest is building within the European community for the standardization of regulations for offshore E&P activities. Several international of regulations for offshore E&P activities. Several international frameworks or forums have been mentioned as possible candidates. These include the United Nations Convention on the Law of the Sea, 1982 (UNCLOS); London Convention 1972 (LC 1972) and the International Convention for the Prevention of Pollution from Ships, 1973, as modified by the Protocol of 1978 (MARPOL) 73/78. International offshore oil and gas operators operate within requirements of regional conventions under the United Nations Environmental Program`s (UNEP) - Regional Seas Program. Domestic offshore operations are undertaken under the auspices of the U.S. Environmental Protection Agency and Minerals Management Service.

  12. Method and Apparatus Providing Deception and/or Altered Operation in an Information System Operating System

    Science.gov (United States)

    Cohen, Fred; Rogers, Deanna T.; Neagoe, Vicentiu

    2008-10-14

    A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.

  13. 75 FR 69878 - Drawbridge Operation Regulation; Neuse River, New Bern, NC

    Science.gov (United States)

    2010-11-16

    ... Operation Regulation; Neuse River, New Bern, NC AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Fifth Coast Guard District, has issued a temporary... is given. NSR has requested a temporary deviation to the existing regulations for the Neuse River...

  14. 78 FR 56609 - Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY

    Science.gov (United States)

    2013-09-13

    ... Regulations; Reynolds Channel, Lawrence, NY AGENCY: Coast Guard, DHS. ACTION: Notice canceling temporary... Beach Bridge, mile 0.4, across Reynolds Channel, at Lawrence, New York. The owner of the bridge, Nassau... published a temporary deviation entitled ``Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY...

  15. 75 FR 38411 - Drawbridge Operation Regulations; Charles River, Boston, MA, Public Event

    Science.gov (United States)

    2010-07-02

    ... Operation Regulations; Charles River, Boston, MA, Public Event AGENCY: Coast Guard, DHS. ACTION: Notice of..., telephone 202-366-9826. SUPPLEMENTARY INFORMATION: The Craigie Bridge, across the Charles River at mile 1.0... elevation above the Charles River Dam. The existing drawbridge operation regulations are listed at 33 CFR...

  16. 76 FR 11679 - Drawbridge Operation Regulation; Shark River (South Channel), Belmar, NJ

    Science.gov (United States)

    2011-03-03

    ... Operation Regulation; Shark River (South Channel), Belmar, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... temporary deviation from the regulations governing the operation of the S71 Bridge across Shark River (South... Bridge, a bascule lift drawbridge, across Shark River (South Channel), at mile 0.8, in Belmar, NJ, has a...

  17. 78 FR 66265 - Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY

    Science.gov (United States)

    2013-11-05

    ... Regulations; Reynolds Channel, Lawrence, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... from the regulations governing the operation of the Atlantic Beach Bridge, mile 0.4, across Reynolds.... SUPPLEMENTARY INFORMATION: The Atlantic Beach Bridge, across Reynolds Channel, mile 0.4, at Lawrence, New York...

  18. 78 FR 37456 - Drawbridge Operation Regulations; Reynolds Channel, Nassau, NY

    Science.gov (United States)

    2013-06-21

    ... Regulations; Reynolds Channel, Nassau, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from... regulation governing the operation of the Long Beach Bridge, mile 4.7, across Reynolds Channel at Nassau, New... July 1, 2013. Reynolds Creek has commercial and recreational vessel traffic. No objections were...

  19. 78 FR 56610 - Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY

    Science.gov (United States)

    2013-09-13

    ... Regulations; Reynolds Channel, Lawrence, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... from the regulations governing the operation of the Atlantic Beach Bridge, mile 0.4, across Reynolds.... SUPPLEMENTARY INFORMATION: The Atlantic Beach Bridge, across Reynolds Channel, mile 0.4, at Lawrence, New York...

  20. 77 FR 37316 - Drawbridge Operation Regulations; Reynolds Channel, Nassau, NY

    Science.gov (United States)

    2012-06-21

    ... Regulations; Reynolds Channel, Nassau, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from... regulations governing the operation of the Long Beach Bridge, mile 4.7, across Reynolds Channel, at Nassau...: The Long Beach Bridge, across Reynolds Channel, mile 4.7, at Nassau, New York, has a vertical...

  1. 78 FR 26508 - Drawbridge Operation Regulations; Reynolds Channel, Nassau, NY

    Science.gov (United States)

    2013-05-07

    ... Regulations; Reynolds Channel, Nassau, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from... regulation governing the operation of the Long Beach Bridge, mile 4.7, across Reynolds Channel at Nassau, New.... on July 12, 2013. Reynolds Creek has commercial and recreational vessel traffic. No objections were...

  2. 78 FR 34893 - Drawbridge Operation Regulations; Reynolds Channel, Lawrence, NY

    Science.gov (United States)

    2013-06-11

    ... Regulations; Reynolds Channel, Lawrence, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... from the regulations governing the operation of the Atlantic Beach Bridge, mile 0.4, across Reynolds... Reynolds Channel, mile 0.4, at Lawrence, New York, has a vertical clearance in the closed position of 25...

  3. Federal Environmental Regulations Impacting Hydrocarbon Exploration, Drilling, and Production Operations

    Energy Technology Data Exchange (ETDEWEB)

    Carroll, Herbert B.; Johnson, William I.

    1999-04-27

    Waste handling and disposal from hydrocarbon exploration, drilling, and production are regulated by the US Environmental Protection Agency (EPA) through federal and state regulations and/or through implementation of federal regulations. Some wastes generated in these operations are exempt under the Resource Conservation and Recovery Act (RCRA) but are not exempt under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), Superfund Amendments and Reauthorization Act (SARA), and other federal environmental laws. Exempt wastes remain exempt only if they are not mixed with hazardous wastes or hazardous substances. Once mixture occurs, the waste must be disposed as a hazardous material in an approved hazardous waste disposal facility. Before the Clean Air Act as amended in 1990, air emissions from production, storage, steam generation, and compression facilities associated with hydrocarbon exploration, drilling, and production industry were not regulated. A critical proposed regulatory change which will significantly effect Class II injection wells for disposal of produced brine and injection for enhanced oil recovery is imminent. Federal regulations affecting hydrocarbon exploration, drilling and production, proposed EPA regulatory changes, and a recent significant US Court of Appeals decision are covered in this report. It appears that this industry will, in the future, fall under more stringent environmental regulations leading to increased costs for operators.

  4. 77 FR 420 - Drawbridge Operation Regulation; Corson Inlet, Stathmere, NJ

    Science.gov (United States)

    2012-01-05

    ... the course of the project, while the railings on the moveable span portion of the bridge are replaced... deviation from the regulations governing the operation of the Corson Inlet Bridge (County Route 619), across... INFORMATION: The Cape May County Bridge Commission, who owns and operates this bascule drawbridge, has...

  5. 76 FR 63840 - Drawbridge Operation Regulation; Corson Inlet, Strathmere, NJ

    Science.gov (United States)

    2011-10-14

    ... during the project while the railings on the moveable span portion of the bridge are replaced. DATES... deviation from the regulations governing the operation of the Corson Inlet Bridge (County Route 619), at.... SUPPLEMENTARY INFORMATION: The Cape May County Bridge Commission, who owns and operates this bascule drawbridge...

  6. 77 FR 10371 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-02-22

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the bridge owner to conduct... change to the operation of the Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The...

  7. 77 FR 73967 - Drawbridge Operation Regulation; Bear Creek, Dundalk, MD

    Science.gov (United States)

    2012-12-12

    ... owner displayed on the Wise Avenue Bridge signage that stated a 48-hour advance notice was required to open the draw bridge. This signage portrayed improper operational information since the current operation regulation had not changed. The Coast Guard determined the signage that stated a 48-hour advance...

  8. The nuclear industry's transition to risk-informed regulation and operation in the United States

    International Nuclear Information System (INIS)

    Kadak, Andrew C.; Matsuo, Toshihiro

    2007-01-01

    This paper summarizes a study of the transition of the United States nuclear industry from a prescriptive regulatory structure to a more risk informed approach to operations and regulations. The transition occurred over a 20 yr period in which gradual changes were made in the fundamental regulations and to the approach to nuclear safety and operations. While the number of actual regulatory changes were few, they are continuing. The utilities that embraced risk informed operations made dramatic changes in the way they approached operations and outage management. Those utilities that used risk in operations showed dramatic improvement in safety based on Institute of Nuclear Power Operations (INPO) performance indicators. It was also shown that the use of risk did not negatively affect safety performance of the plants compared to standard prescriptive approaches. This was despite having greater flexibility in compliance to regulatory standards and the use of the newly instituted risk-informed reactor oversight process. Key factors affecting the successful transition to a more risk-informed approach to regulations and operations are: strong top management support and leadership both at the regulator and the utility; education and training in risk principles and probabilistic risk Assessment tools for engineers, operators and maintenance staff; a slow and steady introduction of risk initiatives in areas that can show value to both the regulator and the industry; a transparent regulatory foundation built around a safety goal policy and the development of a strong safety culture at the utility to allow for more independence in safety compliance and risk management. The experience of the United States shows positive results in both safety and economics. The INPO and NRC metrics presented show that the use of risk information in operations and regulation is marginally better with no degradation in safety when plants that have embraced risk-informed approaches are compared

  9. 77 FR 5201 - Drawbridge Operation Regulation; Bear Creek, Dundalk, MD

    Science.gov (United States)

    2012-02-02

    ...-AA09 Drawbridge Operation Regulation; Bear Creek, Dundalk, MD AGENCY: Coast Guard, DHS. ACTION: Notice... operation of the Baltimore County highway bridge at Wise Avenue across Bear Creek, mile 3.4, between Dundalk... Avenue across Bear Creek, mile 3.4 between Dundalk and Sparrows Point, MD. This change would require the...

  10. 77 FR 3608 - Drawbridge Operation Regulation; Boudreaux Canal, Chauvin, LA

    Science.gov (United States)

    2012-01-25

    ... deviation from the regulation governing the operation of the State Route 56 swing bridge across Boudreaux... the operating schedule for the swing span bridge across Boudreaux Canal, mile 0.1, at Chauvin..., elevation 3 feet Mean Sea Level in the closed-to-navigation position and unlimited in the open-to-navigation...

  11. An Improved Multi-Objective Artificial Bee Colony Optimization Algorithm with Regulation Operators

    Directory of Open Access Journals (Sweden)

    Jiuyuan Huo

    2017-02-01

    Full Text Available To achieve effective and accurate optimization for multi-objective optimization problems, a multi-objective artificial bee colony algorithm with regulation operators (RMOABC inspired by the intelligent foraging behavior of honey bees was proposed in this paper. The proposed algorithm utilizes the Pareto dominance theory and takes advantage of adaptive grid and regulation operator mechanisms. The adaptive grid technique is used to adaptively assess the Pareto front maintained in an external archive and the regulation operator is used to balance the weights of the local search and the global search in the evolution of the algorithm. The performance of RMOABC was evaluated in comparison with other nature inspired algorithms includes NSGA-II and MOEA/D. The experiments results demonstrated that the RMOABC approach has better accuracy and minimal execution time.

  12. 75 FR 1706 - Drawbridge Operation Regulations; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2010-01-13

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket Number USCG-2009-1097] Drawbridge Operation Regulations; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District has...

  13. 76 FR 6694 - Drawbridge Operation Regulation; Upper Mississippi River, Keokuk, IA

    Science.gov (United States)

    2011-02-08

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket Number USCG-2011-0029] Drawbridge Operation Regulation; Upper Mississippi River, Keokuk, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has...

  14. 76 FR 17541 - Drawbridge Operation Regulation; Mermentau River, Grand Chenier, LA

    Science.gov (United States)

    2011-03-30

    ... temporary deviation from the regulation governing the operation of the SR 82 swing span bridge across the... from the operating schedule of the swing span bridge across the Mermentau River at mile 7.1 in Grand... Sea Level. Vessels are able to transit under the bridge during operations. There is an alternate...

  15. 75 FR 18055 - Drawbridge Operation Regulation; Mermentau River, Grand Chenier, LA

    Science.gov (United States)

    2010-04-09

    ... temporary deviation from the regulation governing the operation of the SR 82 swing span bridge across the... Development has requested a temporary deviation from the operating schedule of the swing span bridge across..., elevation 3.1 feet Mean Sea Level. Vessels are able to transit under the bridge during operations. There is...

  16. 77 FR 69761 - Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA

    Science.gov (United States)

    2012-11-21

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2012-0995] Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Coast Guard has issued a temporary deviation from the...

  17. 75 FR 76279 - Drawbridge Operation Regulation; Upper Mississippi River, Burlington, IA

    Science.gov (United States)

    2010-12-08

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-1058] Drawbridge Operation Regulation; Upper Mississippi River, Burlington, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  18. 78 FR 72022 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2013-12-02

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2013-0964] Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from drawbridge regulation. SUMMARY: The Coast Guard has issued a temporary deviation from the...

  19. 76 FR 79066 - Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA

    Science.gov (United States)

    2011-12-21

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2011-1018] Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  20. 76 FR 72308 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2011-11-23

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2011-1039] Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  1. 78 FR 76750 - Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2013-1008] Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from drawbridge regulations. SUMMARY: The Coast Guard has issued a temporary deviation from the...

  2. 75 FR 70817 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2010-11-19

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-1039] Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  3. 75 FR 78162 - Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA

    Science.gov (United States)

    2010-12-15

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-1084] Drawbridge Operation Regulation; Upper Mississippi River, Clinton, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, Eighth Coast Guard District, has issued a...

  4. 77 FR 69759 - Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA

    Science.gov (United States)

    2012-11-21

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2012-1002] Drawbridge Operation Regulation; Upper Mississippi River, Dubuque, IA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Coast Guard has issued a temporary deviation from the...

  5. 76 FR 65118 - Drawbridge Operation Regulation; Bear Creek, Sparrows Point, MD

    Science.gov (United States)

    2011-10-20

    ...-AA09 Drawbridge Operation Regulation; Bear Creek, Sparrows Point, MD AGENCY: Coast Guard, DHS. ACTION... regulation. The Baltimore County Revenue Authority (Dundalk Avenue) highway toll drawbridge across Bear Creek... applicable or necessary. Basis and Purpose The drawbridge across Bear Creek, mile 1.5 was removed and...

  6. 78 FR 66266 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2013-11-05

    ... Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... from the regulations governing the operation of the Path (Railroad) Bridge across the Hackensack River, mile 3.0, at Jersey City, New Jersey. Under this temporary deviation, the bridge may remain in the...

  7. 77 FR 28488 - Drawbridge Operation Regulation; Upper Mississippi River, Hannibal, MO

    Science.gov (United States)

    2012-05-15

    ... Operation Regulation; Upper Mississippi River, Hannibal, MO AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Hannibal Railroad Drawbridge across the Upper Mississippi River, mile 309.9, at Hannibal, Missouri. The deviation is necessary to allow the replacement of eight wire rope...

  8. 78 FR 64887 - Drawbridge Operation Regulation; Upper Mississippi River, Hannibal, MO

    Science.gov (United States)

    2013-10-30

    ... Operation Regulation; Upper Mississippi River, Hannibal, MO AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Hannibal Railroad Drawbridge across the Upper Mississippi River, mile 309.9, at Hannibal, Missouri. The deviation is necessary to allow the bridge owner time to replace...

  9. 76 FR 76637 - Drawbridge Operation Regulation; Saginaw River, Bay City, MI

    Science.gov (United States)

    2011-12-08

    ...-AA09 Drawbridge Operation Regulation; Saginaw River, Bay City, MI AGENCY: Coast Guard, DHS. ACTION... at mile 5.60, and the Lafayette Street Bridge at mile 6.78, all over the Saginaw River at Bay City... the Great Lakes, requested that the existing drawbridge regulation for Saginaw River be reviewed and...

  10. ER-E3 regulation. Minimal instrumentation that must operate nuclear medicine in Cuba

    International Nuclear Information System (INIS)

    2015-01-01

    The purpose of this regulation is to define the instrumentation that must exist in any institution conducting the practice of nuclear medicine in Cuba. This regulation emphasizes two aspects: The minimum equipment necessary to operate a nuclear medicine laboratory for use 'in vitro' and the minimum equipment required to operate a Nuclear Medicine use 'in vivo'

  11. Wind farms providing secondary frequency regulation: evaluating the performance of model-based receding horizon control

    Directory of Open Access Journals (Sweden)

    C. R. Shapiro

    2018-01-01

    Full Text Available This paper is an extended version of our paper presented at the 2016 TORQUE conference (Shapiro et al., 2016. We investigate the use of wind farms to provide secondary frequency regulation for a power grid using a model-based receding horizon control framework. In order to enable real-time implementation, the control actions are computed based on a time-varying one-dimensional wake model. This model describes wake advection and wake interactions, both of which play an important role in wind farm power production. In order to test the control strategy, it is implemented in a large-eddy simulation (LES model of an 84-turbine wind farm using the actuator disk turbine representation. Rotor-averaged velocity measurements at each turbine are used to provide feedback for error correction. The importance of including the dynamics of wake advection in the underlying wake model is tested by comparing the performance of this dynamic-model control approach to a comparable static-model control approach that relies on a modified Jensen model. We compare the performance of both control approaches using two types of regulation signals, RegA and RegD, which are used by PJM, an independent system operator in the eastern United States. The poor performance of the static-model control relative to the dynamic-model control demonstrates that modeling the dynamics of wake advection is key to providing the proposed type of model-based coordinated control of large wind farms. We further explore the performance of the dynamic-model control via composite performance scores used by PJM to qualify plants for regulation services or markets. Our results demonstrate that the dynamic-model-controlled wind farm consistently performs well, passing the qualification threshold for all fast-acting RegD signals. For the RegA signal, which changes over slower timescales, the dynamic-model control leads to average performance that surpasses the qualification threshold, but further

  12. Regulator and industry Co-operation on safety research: challenges and opportunities. Final report and answers to questionnaire

    International Nuclear Information System (INIS)

    2003-02-01

    A Group has been set up by the CSNI to identify and review the issues which hinder closer co-operation on research between regulators and industry, and to propose possible ways for resolving such issues while maintaining regulatory independence in decision-making. The Group has analyzed the potential advantages and disadvantages of regulator-industry collaboration in safety research and has also provided indications on how to overcome possible difficulties that can arise from such collaboration. The Group focused in particular on the issue of regulator independence, on means to preserve it and ways to demonstrate it to the public while undertaking collaboration with industry

  13. 47 CFR 64.707 - Public dissemination of information by providers of operator services.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Public dissemination of information by providers of operator services. 64.707 Section 64.707 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... § 64.707 Public dissemination of information by providers of operator services. Providers of operator...

  14. Why do health and social care providers co-operate?

    Science.gov (United States)

    van Raak, Arno; Paulus, Aggie; Mur-Veeman, Ingrid

    2005-09-28

    Within Europe, although there are numerous examples of poor co-ordination in the delivery of integrated care, many providers do co-operate. We wanted to know why providers are moved to co-operate. In terms of systematic research, this is a new field; researchers have only begun to theorise about the rationales for co-operation. Practically, the issue of achieving co-operation attracts much attention from policymakers. Understanding the reasons for co-operation is a prerequisite for developing effective policy in support of integrated care. Our aim is to explore the comparative validity of different theoretical perspectives on the reasons for co-operation, to indicate directions for further study and for policy making. We used data from three successive studies to perform pattern matching with six established theoretical perspectives: transaction costs economics, strategic choice theory, resource dependence theory, learning theory, stakeholder theory and institutional theory. Insights from the studies were compared for validating purposes (triangulation). The first study concerned the evaluation of the Dutch 'National Home Health Care Programme' according to the case study methodology. The second and third studies were surveys among project directors: questionnaires were based on the concepts derived from the first study. Researchers should combine normative institutional theory, resource dependence theory and stakeholder theory into one perspective, in order to study relationship formation in health and social care. The concept of institutions (rules) is the linchpin between the theories. Policy makers must map the institutions of stakeholders and enable integrated care policy to correspond with these institutions as much as possible.

  15. 76 FR 81826 - Drawbridge Operation Regulation; Pocomoke River, Pocomoke City, MD

    Science.gov (United States)

    2011-12-29

    ... Operation Regulation; Pocomoke River, Pocomoke City, MD AGENCY: Coast Guard, DHS. ACTION: Notice of... River, mile 15.6, at Pocomoke City, MD. The deviation restricts the operation of the draw span to... five hours advance notice is given. The Route 675 Bridge across Pocomoke River, mile 15.6 at Pocomoke...

  16. 76 FR 5686 - Drawbridge Operation Regulation; Pocomoke River, Pocomoke City, MD

    Science.gov (United States)

    2011-02-02

    ... Operation Regulation; Pocomoke River, Pocomoke City, MD AGENCY: Coast Guard, DHS. ACTION: Notice of... River, mile 15.6, at Pocomoke City, MD. The deviation restricts the operation of the draw span to.... The Route 675 Bridge across Pocomoke River, mile 15.6 at Pocomoke City MD, has a vertical clearance in...

  17. 75 FR 1738 - Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT

    Science.gov (United States)

    2010-01-13

    ...-AA09 Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT AGENCY: Coast... regulation governing the operation of three bridges across the Quinnipiac and Mill Rivers at New Haven... and 15 feet at mean low water. The Chapel Street Bridge at mile 0.4, across the Mill River has a...

  18. [Does co-operation research provide approaches to explain the changes in the German hospital market?].

    Science.gov (United States)

    Raible, C; Leidl, R

    2004-11-01

    The German hospital market faces an extensive process of consolidation. In this change hospitals consider cooperation as one possibility to improve competitiveness. To investigate explanations of changes in the German hospital market by theoretical approaches of cooperation research. The aims and mechanism of the theories, their relevance in terms of contents and their potential for empirical tests were used as criteria to assess the approaches, with current and future trends in the German hospital market providing the framework. Based on literature review, six theoretical approaches were investigated: industrial organization, transaction cost theory, game theory, resource dependency, institutional theory, and co-operative investment and finance theory. In addition, the data needed to empirically test the theories were specified. As a general problem, some of the theoretical approaches set a perfect market as a precondition. This precondition is not met by the heavily regulated German hospital market. Given the current regulations and the assessment criteria, industrial organization as well as resource-dependency and institutional theory approaches showed the highest potential to explain various aspects of the changes in the hospital market. So far, none of the approaches investigated provides a comprehensive and empirically tested explanation of the changes in the German hospital market. However, some of the approaches provide a theoretical background for part of the changes. As this dynamic market is economically of high significance, there is a need for further development and empirical testing of relevant theoretical approaches.

  19. Regulated underground storage tanks

    International Nuclear Information System (INIS)

    1992-06-01

    This guidance package is designed to assist DOE Field operations by providing thorough guidance on the underground storage tank (UST) regulations. [40 CFR 280]. The guidance uses tables, flowcharts, and checklists to provide a ''roadmap'' for DOE staff who are responsible for supervising UST operations. This package is tailored to address the issues facing DOE facilities. DOE staff should use this guidance as: An overview of the regulations for UST installation and operation; a comprehensive step-by-step guidance for the process of owning and operating an UST, from installation to closure; and a quick, ready-reference guide for any specific topic concerning UST ownership or operation

  20. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1987-05-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes

  1. A regulator's perspective on NRC's participation in the operations ampersand maintenance committees

    International Nuclear Information System (INIS)

    Wessman, R.H.

    1996-01-01

    As a regulator fairly new to the American Society of Mechanical Engineers (ASME) Operations and Maintenance (O ampersand M) Committee process, the author does not have a personal historical perspective as do many of the longer-term, and highly respected, members of the O ampersand M Committee. However, as Branch Chief of the Mechanical Engineering Branch, Division of Engineering, in the Office of Nuclear Reactor Regulation at the NRC for just over two years, he has responsibility for the regulatory agency's review of licensee actions involving the products that come from the efforts of the O ampersand M Committee, as well as responsibility for portions of the activities of interest to other ASME Code groups such as Section III, Section XI, and Qualification of Mechanical Equipment. As a result, the author has learned a great deal about the code process in a short time. Here he gives his perspectives on the process and provides a few thoughts on the direction for the future

  2. Operational Management System for Regulated Water Systems

    Science.gov (United States)

    van Loenen, A.; van Dijk, M.; van Verseveld, W.; Berger, H.

    2012-04-01

    Most of the Dutch large rivers, canals and lakes are controlled by the Dutch water authorities. The main reasons concern safety, navigation and fresh water supply. Historically the separate water bodies have been controlled locally. For optimizating management of these water systems an integrated approach was required. Presented is a platform which integrates data from all control objects for monitoring and control purposes. The Operational Management System for Regulated Water Systems (IWP) is an implementation of Delft-FEWS which supports operational control of water systems and actively gives advice. One of the main characteristics of IWP is that is real-time collects, transforms and presents different types of data, which all add to the operational water management. Next to that, hydrodynamic models and intelligent decision support tools are added to support the water managers during their daily control activities. An important advantage of IWP is that it uses the Delft-FEWS framework, therefore processes like central data collection, transformations, data processing and presentation are simply configured. At all control locations the same information is readily available. The operational water management itself gains from this information, but it can also contribute to cost efficiency (no unnecessary pumping), better use of available storage and advise during (water polution) calamities.

  3. 78 FR 77591 - Drawbridge Operation Regulation; Shark River, NJ

    Science.gov (United States)

    2013-12-24

    ... Operation Regulation; Shark River, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from drawbridge... governs the bascule span of the Route 71 Bridge across Shark River (South Channel), mile 0.8, at Belmar... motor seals and instrumentation on the bridge. The Route 71 Bridge across Shark River (South Channel...

  4. 77 FR 12514 - Drawbridge Operation Regulation; Hood Canal, WA

    Science.gov (United States)

    2012-03-01

    ... operating regulation for the Hood Canal floating drawbridge near Port Gamble. This modification would relieve heavy rush hour road traffic on State Routes 3 and 104, by allowing the draws of the bridge to not.... FOR FURTHER INFORMATION CONTACT: If you have questions on this rule, call or email the Bridge...

  5. French experience of regulation and operation on reprocessing facilities of LWR spent fuels

    Energy Technology Data Exchange (ETDEWEB)

    Mercier, J P [DES/SESUL (France)

    1992-02-01

    This presentation describes the French experience of regulation and operation on reprocessing facilities: how the safety assessment was made of UP3-A plant of the La Hague establishment for the building permit and operating license within the context of French nuclear regulations and the national debate on the need for reprocessing. Other factors discussed are how the public was involved, how the regulations were improved in the process and what the different stages of commissioning consisted of. In the design studies of a reprocessing facility, three complementary approaches are used: - observance of regulations born of technical considerations, and good practice, - analysis of the hazards, using deterministic and probabilistic methods, within the framework of a safety report, - review of experience feedback from such a facility or like plants. The design of the facility must permit the prevention of accidents and limit their consequences. Moreover, during all foreseeable cases (normal operating, incidents and accidents), the safety of the staff, the public and the environment with regard to consequences of radioactive releases and ionising radiations must be ensured. In the evaluation of these consequences, the approach used is voluntarily pessimistic in order to take into account every possible case. It is based on the main following principles: definition of the events considered for the dimensioning of the facility; redundancy and diversification; defense in depth which consists of the multiplication of the barriers. The experience feedback comes, on the one hand from operator's findings aiming at improving its facility, on the other hand from incidents, the lessons of which being taken into account after careful analysis. These incidents are analyzed by the Safety Authority upon presentation of the data by the operator and on site findings of inspections. In other respects, the aim of inspections is to check that the plant and its operating practices are

  6. 77 FR 74546 - Posting of Pamphlet Provided for in the International Marriage Broker Regulation Act

    Science.gov (United States)

    2012-12-14

    ... Marriage Broker Regulation Act ACTION: Notice of posting of pamphlet provided for in section 833(a) of the International Marriage Broker Regulation Act, Title D of Public Law 109-162. SUMMARY: Section 833(a) of the International Marriage Broker Regulation Act, Title D of Public Law 109-162, provided that the Secretary of...

  7. Toward Better Mapping between Regulations and Operations of Enterprises Using Vocabularies and Semantic Similarity

    Directory of Open Access Journals (Sweden)

    Sagar Sunkle

    2015-12-01

    Full Text Available Industry governance, risk, and compliance (GRC solutions stand to gain from various analyses offered by formal compliance checking approaches. Such adoption is made difficult by the fact that most formal approaches assume that a mapping between concepts of regulations and models of operational specifics exists. Industry solutions offer tagging mechanisms to map regulations to operational specifics; however, they are mostly semi-formal in nature and tend to rely extensively on experts. We propose to use Semantics of Business Vocabularies and Rules along with similarity measures to create an explicit mapping between concepts of regulations and models of operational specifics of the enterprise. We believe that our work-in-progress takes a step toward adapting and leveraging formal compliance checking approaches in industry GRC solutions.

  8. Operation of Grid -Connected Lithium-Ion Battery Energy Storage System for Primary Frequency Regulation

    DEFF Research Database (Denmark)

    Stroe, Daniel Loan; Knap, Vaclav; Swierczynski, Maciej Jozef

    2017-01-01

    Because of their characteristics, which have been continuously improved during the last years, Lithium ion batteries were proposed as an alternative viable solution to present fast-reacting conventional generating units to deliver the primary frequency regulation service. However, even though...... there are worldwide demonstration projects where energy storage systems based on Lithium-ion batteries are evaluated for such applications, the field experience is still very limited. In consequence, at present there are no very clear requirements on how the Lithium-ion battery energy storage systems should...... be operated while providing frequency regulation service and how the system has to re-establish its SOC once the frequency event has passed. Therefore, this paper aims to investigate the effect on the lifetime of the Lithium-ion batteries energy storage system of various strategies for re...

  9. Suggested Operation Grid-Connected Lithium-Ion Battery Energy Storage System for Primary Frequency Regulation

    DEFF Research Database (Denmark)

    Stroe, Daniel Ioan; Knap, Vaclav; Swierczynski, Maciej Jozef

    2015-01-01

    Because of their characteristics, which have been continuously improved during the last years, Lithium ion batteries were proposed as an alternative viable solution to present fast-reacting conventional generating units to deliver the primary frequency regulation service. However, even though...... there are worldwide demonstration projects where energy storage systems based on Lithium-ion batteries are evaluated for such applications, the field experience is still very limited. In consequence, at present there are no very clear requirements on how the Lithium-ion battery energy storage systems should...... be operated while providing frequency regulation service and how the system has to re-establish its SOC once the frequency event has passed. Therefore, this paper aims to investigate the effect on the lifetime of the Lithium-ion batteries energy storage system of various strategies for re...

  10. 76 FR 9646 - Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation...

    Science.gov (United States)

    2011-02-22

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Parts 100, 117, 147, and 165 [USCG-2010-0399] Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation Regulations and Regulated Navigation Areas AGENCY: Coast Guard, DHS. ACTION: Notice of expired temporary rules...

  11. Operating Nuclear Power Stations in a Regulated Cyber Security Environment

    Energy Technology Data Exchange (ETDEWEB)

    Dorman, E.

    2014-07-01

    The United States Nuclear Regulatory Commission (NRC) issued 10CFR73.54 to implement a regulated Cyber Security Program at each operating nuclear reactor facility. Milestones were implemented December 31, 2012 to mitigate the attack vectors for the most critical digital assets acknowledged by the industry and the NR C. The NRC inspections have begun. The nuclear Cyber Security Plan, implemented by the site Cyber Security Program (Program), is an element of the operating license at each facility. (Author)

  12. Operating Nuclear Power Stations in a Regulated Cyber Security Environment

    International Nuclear Information System (INIS)

    Dorman, E.

    2014-01-01

    The United States Nuclear Regulatory Commission (NRC) issued 10CFR73.54 to implement a regulated Cyber Security Program at each operating nuclear reactor facility. Milestones were implemented December 31, 2012 to mitigate the attack vectors for the most critical digital assets acknowledged by the industry and the NR C. The NRC inspections have begun. The nuclear Cyber Security Plan, implemented by the site Cyber Security Program (Program), is an element of the operating license at each facility. (Author)

  13. 75 FR 17561 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-04-07

    ... issued a temporary deviation from the regulation governing the operations of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, Mile 482.9, Rock Island, Illinois. The deviation is... Manager, Docket Operations, telephone (202) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island...

  14. 75 FR 22228 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-04-28

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, Mile 482.9, Rock Island, Illinois. The deviation is... Manager, Docket Operations, telephone (202) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island...

  15. 75 FR 68974 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-11-10

    ..., has issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois... Operations, telephone 202-366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a...

  16. 78 FR 35756 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Science.gov (United States)

    2013-06-14

    ... Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... from the regulation governing the operation of the Willis Avenue Bridge across the Harlem River, mile 1... found at 33 CFR 117.789(b)(2). The bridge owner, New York City Department of Transportation, requested a...

  17. Agriculture: Laws and Regulations that Apply to Your Agricultural Operation by Farm Activity

    Science.gov (United States)

    A general description of EPA’s requirements applicable to agriculture, and should only be used as a guide. Since rules and regulations may change use this information is a starting place to determine which regulations apply to your agricultural operation.

  18. 78 FR 69995 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-11-22

    ... Operation Regulation; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the bridge owner time...

  19. 76 FR 60732 - Drawbridge Operation Regulations; Navesink (Swimming) River, NJ

    Science.gov (United States)

    2011-09-30

    ... Operation Regulations; Navesink (Swimming) River, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... (Swimming) River between Oceanic and Locust Point, New Jersey. The deviation is necessary to facilitate...: The Oceanic Bridge, across the Navesink (Swimming) River, mile 4.5, between Oceanic and Locust Point...

  20. 77 FR 57022 - Drawbridge Operation Regulation; Shark River, Avon, NJ

    Science.gov (United States)

    2012-09-17

    ... Operation Regulation; Shark River, Avon, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation... across the Shark River (South Channel), at Avon Township, NJ. This deviation is necessary to facilitate stringer replacement on the Shark River railroad bridge. This temporary deviation will allow the...

  1. 77 FR 47792 - Drawbridge Operation Regulation; Schuylkill River, Philadelphia, PA

    Science.gov (United States)

    2012-08-10

    ... high tide in the closed position and unlimited in the open position. The current operating schedule for... Indian tribes. Energy Effects This proposed rule is not a ``significant energy action'' under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or...

  2. Use of operator-provided, installed C/S equipment in IAEA safeguards

    International Nuclear Information System (INIS)

    Shea, T.; Rundquist, D.; Gaertner, K.; Yellin, E.

    1987-01-01

    Developing solutions for complex safe guards problems in close cooperation with Operators is becoming more common, especially as the IAEA continues to operate under zero-growth limitations. This has in practice taken on various forms; from the extreme case of very specific equipment developed and constructed by the State/Operator for use in only one facility, to the more normal case where only the development is carried out by the State/Operator. This practice has advantages and disadvantages. For example, to ensure that Agency inspections will be carried out in a predictable manner, it will be in the Operator's interest to ensure that any equipment he provides is of the highest quality, meets all national safety requirements, and is installed and maintained in such a manner that it will provide years of service. Agency equipment performs its intended function in a reliable manner, but with very specific, limited applications in mind, improvements in reliability over that obtained with normal Agency equipment are to be expected. Also, the authors experience is that reaching acceptable arrangements for the use of State- of Operator-supplied equipment is often far more straightforward than when arranging to apply Agency equipment

  3. An examination of the roles of trauma exposure and posttraumatic stress disorder on emotion regulation strategies of Operation Iraqi Freedom, Operation Enduring Freedom, and Operation New Dawn veterans.

    Science.gov (United States)

    Sippel, Lauren M; Roy, Alicia M; Southwick, Steven M; Fichtenholtz, Harlan M

    2016-09-01

    Theories of posttraumatic stress disorder (PTSD) implicate emotional processes, including difficulties utilizing adaptive emotion regulation strategies, as critical to the etiology and maintenance of PTSD. Operation Iraqi Freedom, Operation Enduring Freedom, and Operation New Dawn (OIF/OEF/OND) veterans report high levels of combat exposure and PTSD. We aimed to extend findings suggesting that emotion regulation difficulties are a function of PTSD, rather than combat trauma exposure or common comorbidities, to OIF/OEF/OND veterans, in order to inform models of PTSD risk and recovery that can be applied to returning veterans. We tested differences in emotion regulation, measured with the Difficulties in Emotion Regulation Scale and Emotion Regulation Questionnaire, among trauma-exposed veterans with (n = 24) or without PTSD (n = 22) and healthy civilian comparison participants (n = 27) using multivariate analyses of covariance, adjusting for major depressive disorder, anxiety disorders, and demographic variables (age, sex, and ethnicity). Veterans with PTSD reported more use of expressive suppression and more difficulties with emotion regulation than veterans without PTSD and healthy comparison participants. Groups did not differ on cognitive reappraisal. Findings suggest the key role of PTSD above and beyond trauma exposure, depression, and anxiety in specific aspects of emotion dysregulation among OIF/OEF/OND veterans. Interventions that help veterans expand and diversify their emotion regulation skills may serve as helpful adjunctive treatments for PTSD among OIF/OEF/OND veterans.

  4. 78 FR 21537 - Drawbridge Operation Regulations; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2013-04-11

    ... Operation Regulations; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... operating schedule that governs the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation is necessary to allow the Front Street 5K Run...

  5. Providers perspectives on self-regulation impact their use of responsive feeding practices in child care.

    Science.gov (United States)

    Dev, Dipti A; Speirs, Katherine E; Williams, Natalie A; Ramsay, Samantha; McBride, Brent A; Hatton-Bowers, Holly

    2017-11-01

    Supporting children's self-regulation in eating through caregivers' practice of responsive feeding is paramount to obesity prevention, and while much attention has been given to supporting children's self-regulation in eating through parents' responsive feeding practices in the home setting, little attention has been given to this issue in childcare settings. This qualitative study examines childcare providers' perspectives on using responsive feeding practices with young children (2-5years). Individual semi-structured interviews were conducted with providers until saturation was reached. Data was analyzed using thematic analysis. The final sample included 18 providers who were employed full-time in Head Start or state-licensed center-based childcare programs, cared for children (2-5y), and were directly responsible for serving meals and snacks. Providers were primarily (67%) employed in childcare programs that served children from low-income families and received reimbursement for meals and snacks from the US Department of Agriculture's Child and Adult Care Food Program. Three factors emerged that shaped childcare providers' experiences using responsive feeding practices: the providers' perspectives about whether or not young children can self-regulate food intake, their understanding of Child and Adult Care Food Program (CACFP) portion size regulations, and the availability of food at the center where they worked. Future research should examine how childcare providers' understanding of children's ability to self-regulate their food intake, the appropriate use of the CACFP regulations in relationship to serving sizes, and having food available to offer seconds promotes providers' use of responsive feeding practices in center-based childcare programs and children's dietary behaviors. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1983-10-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  7. 77 FR 44139 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-07-27

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... Sacramento, CA. The deviation is necessary to allow the community to participate in the Fleet Feet Event, Run... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  8. 76 FR 11960 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-03-04

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  9. 76 FR 11679 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-03-03

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... the Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation...

  10. 76 FR 23188 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-04-26

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  11. 76 FR 79067 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-12-21

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow community celebration of New Year's... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  12. 76 FR 20843 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2011-04-14

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... the Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation...

  13. 77 FR 10372 - Drawbridge Operation Regulation; Sacramento River, Sacramento, CA

    Science.gov (United States)

    2012-02-22

    ... Operation Regulation; Sacramento River, Sacramento, CA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., mile 59.0, at Sacramento, CA. The deviation is necessary to allow the community to participate in the... Tower Drawbridge, mile 59.0, Sacramento River, at Sacramento, CA. The Tower Drawbridge navigation span...

  14. INTERNAL REGULATIONS OF INTERNATIONAL COMPANIES OPERATING IN POLAND AND TRADITIONAL FAMILY MODEL

    Directory of Open Access Journals (Sweden)

    Chojara-Sobiecka Małgorzata

    2017-12-01

    Full Text Available Most of the big companies have the internal regulations about human resources management. The bylaws in question are usually created in the reality of a particular legal system. When a company expands abroad, it starts operating in a different legal system than its own. As a result, the bylaws are not always compatible neither with laws nor the legal culture of the state of a new market. The paper touches upon the problem of the cohesion of internal regulations of some of the international companies operating in Poland with the traditional family model established in Polish law analyzing three areas such as: supporting parenting, family business, and preference for non-heterosexual persons. The conclusions are that some of the internal regulations are not coherent with Polish law, and some of the bylaws regarding, e.g., daycare or flexible working hours, can be adapted to Polish legal system. It (unclear what “it” is referring to would benefit traditional model of the family. The paper contains also the excursus about some legis-lative phenomenon regarding the reception of state law regulations issues by private companies and pos-tulates that the Polish legislator shall be open to new ideas in this matter and search for the well-tried regulations.

  15. 78 FR 3836 - Drawbridge Operation Regulation; Shark River, Avon, NJ

    Science.gov (United States)

    2013-01-17

    ... Operation Regulation; Shark River, Avon, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of deviation from... and the railroad bridge, mile 0.9 both of which are across the Shark River (South Channel), at Avon Township, NJ. This deviation is necessary to facilitate machinery replacement on the Shark River railroad...

  16. 75 FR 30300 - Drawbridge Operation Regulations; Root River, Racine, WI

    Science.gov (United States)

    2010-06-01

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-0414] Drawbridge Operation Regulations; Root River, Racine, WI AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... Bridge at Mile 0.53 over the Root River, at Racine, WI. This deviation will temporarily change the...

  17. Regulatory analysis for amendments to regulations for the environmental review for renewal of nuclear power plant operating licenses. Final report

    International Nuclear Information System (INIS)

    1996-05-01

    This regulatory analysis provides the supporting information for a proposed rule that will amend the Nuclear Regulatory Commission's environmental review requirements for applications for renewal of nuclear power plant operating licenses. The objective of the proposed rulemaking is to improve regulatory efficiency by providing for the generic evaluation of certain environmental impacts associated with nuclear plant license renewal. After considering various options, the staff identified and analyzed two major alternatives. With Alternative A, the existing regulations would not be amended. This option requires that environmental reviews be performed under the existing regulations. Alternative B is to assess, on a generic basis, the environmental impacts of renewing the operating license of individual nuclear power plants, and define the issues that will need to be further analyzed on a case-by-case basis. In addition, Alternative B removes from NRC's review certain economics-related issues. The findings of this assessment are to be codified in 10 CFR 51. The staff has selected Alternative B as the preferred alternative

  18. 78 FR 21839 - Drawbridge Operation Regulation; Green River, Small-house, KY and Black River, Jonesboro, LA

    Science.gov (United States)

    2013-04-12

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2013-0041] RIN 1625-AA09 Drawbridge Operation Regulation; Green River, Small-house, KY and Black River, Jonesboro, LA... drawbridge operation regulation for the drawbridges across Green River, mile 79.6, Small- house, KY and Black...

  19. Characteristics of the prices of operating reserves and regulation services in competitive electricity markets

    International Nuclear Information System (INIS)

    Wang Peng; Zareipour, Hamidreza; Rosehart, William D.

    2011-01-01

    In this paper, characteristics of the prices of reserves and regulation services in the Ontario, New York and ERCOT electricity markets are studied. More specifically, price variability, price jumps, long-range correlation, and non-linearity of the prices are analyzed using the available measures in the literature. For the Ontario electricity market, the prices of 10-min spinning, 10-min non-spinning, and 30-min operating reserves for the period May 1, 2002 to December 31, 2007 are analyzed. For the New York market, prices of the same reserves plus regulation service are studied for the period February 5, 2005 to December 31, 2008. For the ERCOT market, we analyze the prices of responsive reserve, regulation up and regulation down services, for the period January 1, 2005 to December 31, 2009. The studied characteristics of operating reserve and regulation prices are also compared with those of energy prices. The findings of this paper show that the studied reserve and regulation prices feature extreme volatility, more frequent jumps and spikes, different peak price occurrence time, and lower predictability, compared to the energy prices. - Research highlights: → We examine various statistical characteristics of reserve and regulation prices. → We compare characteristics of reserve and regulation and energy prices. → Reserve and regulation prices feature different patterns from energy prices. → Reserve and regulation prices are more dispersive and volatile than energy price.

  20. Wind farms providing secondary frequency regulation: Evaluating the performance of model-based receding horizon control

    International Nuclear Information System (INIS)

    Shapiro, Carl R.; Meneveau, Charles; Gayme, Dennice F.; Meyers, Johan

    2016-01-01

    We investigate the use of wind farms to provide secondary frequency regulation for a power grid. Our approach uses model-based receding horizon control of a wind farm that is tested using a large eddy simulation (LES) framework. In order to enable real-time implementation, the control actions are computed based on a time-varying one-dimensional wake model. This model describes wake advection and interactions, both of which play an important role in wind farm power production. This controller is implemented in an LES model of an 84-turbine wind farm represented by actuator disk turbine models. Differences between the velocities at each turbine predicted by the wake model and measured in LES are used for closed-loop feedback. The controller is tested on two types of regulation signals, “RegA” and “RegD”, obtained from PJM, an independent system operator in the eastern United States. Composite performance scores, which are used by PJM to qualify plants for regulation, are used to evaluate the performance of the controlled wind farm. Our results demonstrate that the controlled wind farm consistently performs well, passing the qualification threshold for all fastacting RegD signals. For the RegA signal, which changes over slower time scales, the controlled wind farm's average performance surpasses the threshold, but further work is needed to enable the controlled system to achieve qualifying performance all of the time. (paper)

  1. 78 FR 31454 - Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY

    Science.gov (United States)

    2013-05-24

    ...-AA09 Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY AGENCY: Coast Guard, DHS... that governs the highway bridge (Troy Green Island) across the Hudson River, mile 152.7, between Troy... the regulations for the 112th Street Bridge, mile 155.4, between Troy and Cohoes which has been...

  2. A three-dimensional operational transient simulation of the CANDU core with typical reactor regulating system

    Energy Technology Data Exchange (ETDEWEB)

    Yeom, Choong Sub; Kim, Hyun Dae; Park, Kyung Seok; Park, Jong Woon [Institute for Advanced Engineering, Taejon (Korea, Republic of)

    1995-07-01

    This paper describes the results of simulation of a CANDU operational transient problem (re-startup after short shutdown) using the Coupled Reactor Kinetics(CRKIN) code developed previously with CANDU Reactor Regulating System (RRS) logic. The performance in the simulation is focused on investigating the behaviours of neutron power and regulating devices in accordance with the changes of xenon concentration following the operation of the RRS.

  3. Ocean Dumping Control Regulations

    International Nuclear Information System (INIS)

    1978-01-01

    These Regulations were made further to the Ocean Dumping Control Act which provides for restrictions in dumping operations. The Regulations contain model applications for permits to dump or load a series of materials. (NEA)

  4. 77 FR 3607 - Drawbridge Operation Regulation; Willamette River, Portland, OR

    Science.gov (United States)

    2012-01-25

    ... deviation from the regulation governing the operation of the Burlington Northern Santa Fe Railway Bridge... Northern Santa Fe (BNSF) Railway has requested to not open the BNSF Railroad Lift Bridge for vessels to... deviation allows the lift span of the BNSF Railway Bridge across the Willamette River, mile 6.9, to remain...

  5. [Philanthropic hospitals and the operation of provider-owned health plans in Brazil].

    Science.gov (United States)

    Lima, Sheyla Maria Lemos; Portela, Margareth C; Ugá, Maria Alicia Dominguez; Barbosa, Pedro Ribeiro; Gerschman, Silvia; Vasconcellos, Miguel Murat

    2007-02-01

    To describe the management performance of philanthropic hospitals that operate their own health plans, in comparison with philanthropic hospitals as a whole in Brazil. The managerial structures of philanthropic hospitals that operated their own health plans were compared with those seen in a representative group from the philanthropic hospital sector, in six dimensions: management and planning, economics and finance, human resources, technical services, logistics services and information technology. Data from a random sample of 69 hospitals within the philanthropic hospital sector and 94 philanthropic hospitals that operate their own health plans were evaluated. In both cases, only the hospitals with less than 599 beds were included. The results identified for the hospitals that operate their own health plans were more positive in all the managerial dimensions compared. In particular, the economics and finance and information technology dimensions were highlighted, for which more than 50% of the hospitals that operated their own health plans presented almost all the conditions considered. The philanthropic hospital sector is important in providing services to the Brazilian Health System (SUS). The challenges in maintaining and developing these hospitals impose the need to find alternatives. Stimulation of a public-private partnership in this segment, by means of operating provider-owned health plans or providing services to other health plans that work together with SUS, is a field that deserves more in-depth analysis.

  6. Preparing Safety Cases for Operating Outside Prescriptive Fatigue Risk Management Regulations.

    Science.gov (United States)

    Gander, Philippa; Mangie, Jim; Wu, Lora; van den Berg, Margo; Signal, Leigh; Phillips, Adrienne

    2017-07-01

    Transport operators seeking to operate outside prescriptive fatigue management regulations are typically required to present a safety case justifying how they will manage the associated risk. This paper details a method for constructing a successful safety case. The method includes four elements: 1) scope (prescriptive rules and operations affected); 2) risk assessment; 3) risk mitigation strategies; and 4) monitoring ongoing risk. A successful safety case illustrates this method. It enables landing pilots in 3-pilot crews to choose the second or third in-flight rest break, rather than the regulatory requirement to take the third break. Scope was defined using a month of scheduled flights that would be covered (N = 4151). These were analyzed in the risk assessment using existing literature on factors affecting fatigue to estimate the maximum time awake at top of descent and sleep opportunities in each break. Additionally, limited data collected before the new regulations showed that pilots flying at landing chose the third break on only 6% of flights. A prospective survey comparing subjective reports (N = 280) of sleep in the second vs. third break and fatigue and sleepiness ratings at top of descent confirmed that the third break is not consistently superior. The safety case also summarized established systems for fatigue monitoring, risk assessment and hazard identification, and multiple fatigue mitigation strategies that are in place. Other successful safety cases have used this method. The evidence required depends on the expected level of risk and should evolve as experience with fatigue risk management systems builds.Gander P, Mangie J, Wu L, van den Berg M, Signal L, Phillips A. Preparing safety cases for operating outside prescriptive fatigue risk management regulations. Aerosp Med Hum Perform. 2017; 88(7):688-696.

  7. Conception and realization of a PV system provided with a sun tracker operating at dual axis

    Directory of Open Access Journals (Sweden)

    Khalil Kassmi

    2016-06-01

    Full Text Available In this paper, we present the conception, the realization and the experimentation of  a photovoltaic (PV system provided with a sun tracker reliable and low cost operating at dual axis. The tracker's role is to orient the PV generator, whose weight may reach 9 Kg, perpendicular to the sun with very good accuracy. This tracking  based on the use of four LDR sensors, which detect the intensity of light scattered by the sun a processing unit, from  command and control (UTCC, which manages all of the sun tracking tasks (the end detection of parcours, regulation of the power supplied by the PV panels (Command MPPT, ... . The results obtained show a significant improvement of the energy produced, compared to conventional PV installations where generators are fixed and oriented south at a  tilt 45°. During a day of operation, improvement could reach 41% and consumption of the tracking does not exceed 0.55% of the energy production produced by the PV generator (an improvement of 5 % compared to existing trackers.

  8. 78 FR 5156 - Drawbridge Operation Regulation; Christina River, Wilmington, DE

    Science.gov (United States)

    2013-01-24

    ... both of the bridges to open on signal, and that the Market Street drawbridge at mile 3.0, open on... Drawbridge Operation Regulation; Christina River, Wilmington, DE AGENCY: Coast Guard, DHS. ACTION: Notice of... Third Street Bridge at mile 2.3, the Walnut Street Bridge at mile 2.8, and the Market Street Bridge at...

  9. 76 FR 13288 - Drawbridge Operation Regulations; Hackensack River, Secaucus, NJ

    Science.gov (United States)

    2011-03-11

    ... deviation from the regulation governing the operation of the Upper Hack Bridge at mile 6.9, across the...: The Upper Hack Bridge, across the Hackensack River at mile 6.9 has a vertical clearance in the closed... rehabilitation at the bridge. Under this temporary deviation the Upper Hack Bridge, mile 6.9, across the...

  10. Plug-in hybrid electric vehicles as regulating power providers. Case studies of Sweden and Germany

    International Nuclear Information System (INIS)

    Andersson, S.-L.; Goeransson, L.; Karlsson, S.; Johnsson, F.; Elofsson, A.K.; Galus, M.D.; Andersson, G.

    2010-01-01

    This study investigates plug-in hybrid electric vehicles (PHEVs) as providers of regulating power in the form of primary, secondary and tertiary frequency control. Previous studies have shown that PHEVs could generate substantial profits while providing ancillary services. This study investigates under what conditions PHEVs can generate revenues using actual market data, i.e. prices and activations of regulating power, from Sweden and Germany from four months in 2008. PHEV market participation is modelled for individual vehicles in a fleet subject to a simulated movement pattern. Costs for infrastructure and vehicle-to-grid equipment are not included in the analysis. The simulation results indicate that maximum average profits generated on the German markets are in the range 30-80 EUR per vehicle and month whereas the Swedish regulating power markets give no profit. In addition, an analysis is performed to identify strengths, weaknesses, opportunities, and threats (SWOT) of PHEVs as regulating power providers. Based on the simulation results and the SWOT analysis, characteristics for an ideal regulating power market for PHEVs are presented. (author)

  11. 75 FR 62469 - Drawbridge Operation Regulations; Newtown Creek, Dutch Kills, English Kills, and Their...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-0907] Drawbridge Operation Regulations; Newtown Creek, Dutch Kills, English Kills, and Their Tributaries, NY, Maintenance AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander...

  12. 75 FR 30299 - Drawbridge Operation Regulations; Newtown Creek, Dutch Kills, English Kills, and Their...

    Science.gov (United States)

    2010-06-01

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-0355] Drawbridge Operation Regulations; Newtown Creek, Dutch Kills, English Kills, and Their Tributaries, NY, Maintenance AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander...

  13. The French Space Operation Act: Scope and Main Features. Introduction to the Technical Regulation Considerations about the Implementation in the Launcher Field

    Science.gov (United States)

    Cahuzac, Francois

    2010-09-01

    This publication provides a presentation of the new French Space Operation Act(hereafter FSOA). The main objectives of FSOA are to institute a clarified legal regime for launch operations. The technical regulation associated to the act is set forth, in particular for the safety of persons and property, the protection of public health and the environment. First, we give an overview of the institutional and legal framework implemented in accordance with the act. The general purpose of this French Space Operation Act(hereafter FSOA) is to set up a coherent national regime of authorization and control of Space operations under the French jurisdiction or for which the French Government bears international liability either under UN Treaties principles(namely the 1967 Outer Space Treaty, the 1972 Liability Convention and the 1976 Registration Convention) or in accordance with its European commitments with the ESA organization and its Members States. For a given space operation, the operator must show that systems and procedures that he intends to implement are compliant with the technical regulation. The regime of authorization leads to a request of authorization for each launch operation. Thus, licences concerning operator management organization or a given space system can be obtained. These licences help to simplify the authorization file required for a given space operation. The technical regulation is presented in another article, and will be issued in 2010 by the French Minister in charge of space activities. A brief description of the organization associated to the implementation of the authorization regime in the launcher field is presented.

  14. FINANCIAL SYSTEM OF JAPAN: THE LEGAL REGULATION OF DISPUTES BETWEEN FINANCIAL SERVICES PROVIDERS AND CONSUMERS

    Directory of Open Access Journals (Sweden)

    E. E. Frolova

    2018-01-01

    Full Text Available Purpose: the article examines the main problems associated the regulatory acts of Japan – The Financial Instruments and Exchange Act, The Banking Act, The  Insurance Business Act, lists the types of financial disputes subject to alternative settlement, identified the parties to the financial dispute. To achieve this goal, the article must solve the following tasks: to determine whether there are institutions in Japan that provide services for resolving financial disputes; to investigate the main problems associated with the definition of the concept and types of financial dispute, the conditions for the transfer of a financial dispute to the competent authority.Methods: this article is based on an interdisciplinary concept of research, which allowed to distinguish the distinctive features of the legal regulation of the settlement of financial disputes in Malaysia.Results: acts of Japan – The Financial Instruments and Exchange Act, The Banking Act, The Insurance Business Act, – refer to financial disputes – disputes resolved by "Designated Dispute Resolution Organizations", the so-called "financial DDRO". Financial disputes are disputes between suppliers and consumers of financial services. The Financial Instruments and Exchange Act details the persons, whose activities fall within the definition of financial provider services. A brief list of financial service providers is available on the website of Japan's main financial regulator, the Financial Services Agency. The list include: Japanese banking institutions, branches and representative offices of foreign banks, business operators of financial instruments, insurance companies, trust companies, financial markets, foreign audit firms. However, unlike other countries of the Asia-Pacific region, consumers of financial services can be both physical and legal entities.Conclusions and Relevance: the materials presented in the article show the special role of "Designated Dispute Resolution

  15. Regulation for installation and operation of experimental-research reactor

    International Nuclear Information System (INIS)

    1979-01-01

    The ordinance is stipulated under the Law for regulation of nuclear raw materials, nuclear fuel materials and reactors and the provisions for installation and operation of reactor in the order for execution of the law. Basic concepts and terms are defined, such as, radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; preserved area; inspected surrounding area and employee. An application for permission of installation of reactor shall list such matters as: the maximum continuous thermal output of reactor; location and general construction of reactor facilities; construction and equipment of the main reactor and other facilities for nuclear fuel materials; cooling and controlling system and radioactive waste, etc. An operation plan of reactor for three years shall be filed till January 31 of the fiscal year preceding that one the operation begins. Records shall be made and kept for specified periods respectively on inspection of reactor facilities, operation, fuel assembly, radiation control, maintenance, accidents of reactor equipment and weather. Detailed rules are settled for entrance limitation to controlled area, exposure dose, inspection, check up and regular independent examination of reactor facilities, operation of reactor, transportation of substances contaminated by nuclear fuel materials within the works and storage, etc. (Okada, K.)

  16. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1993-01-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes

  17. Caregiver Coaching Strategies for Early Intervention Providers: Moving toward Operational Definitions

    Science.gov (United States)

    Friedman, Mollie; Woods, Juliann; Salisbury, Christine

    2012-01-01

    Early intervention (EI) providers increasingly coach and collaborate with caregivers to strengthen and support caregiver-child interactions. The EI providers learning to coach other adults benefit from knowing what, exactly, they should do to support caregivers. This article serves two purposes. First, it proposes an operationally defined,…

  18. 76 FR 4818 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2011-01-27

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... Hackensack River, mile 6.9, at Secaucus, New Jersey. The deviation is necessary for electrical rehabilitation...-9826. SUPPLEMENTARY INFORMATION: The Upper Hack Bridge, across the Hackensack River at mile 6.9 has a...

  19. 75 FR 68704 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2010-11-09

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... the Hackensack River, at Secaucus, New Jersey. Under this temporary deviation the bridge may remain in.... SUPPLEMENTARY INFORMATION: The Upper Hack Bridge, across the Hackensack River at mile 6.9 has a vertical...

  20. 77 FR 22217 - Drawbridge Operation Regulation; Oregon Slough, Hayden Island, OR

    Science.gov (United States)

    2012-04-13

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2012-0290] Drawbridge Operation Regulation; Oregon Slough, Hayden Island, OR AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., at Hayden Island, OR. This deviation is necessary to accommodate maintenance of the train signaling...

  1. 78 FR 56607 - Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY

    Science.gov (United States)

    2013-09-13

    ...-AA09 Drawbridge Operation Regulation; Hudson River, Troy and Green Island, NY AGENCY: Coast Guard, DHS... operation of the highway bridge across the Hudson River, mile 152.7, between Troy and Green Island, New York... Street Bridge, mile 155.4, between Troy and Cohoes which has been converted to a fixed bridge. It is...

  2. The role of the regulator in promoting and evaluating safety culture. Operating experience feedback programme approach

    International Nuclear Information System (INIS)

    Perez, S.

    2002-01-01

    Promoting and Evaluating Safety Culture (S.C.) in Operating Organizations must be one of the main Nuclear Regulator goals to achieve. This can be possible only if each and every one of the regulatory activities inherently involves S.C. It can be seen throughout attitudes, values, uses and practices in both individuals and the whole regulatory organization. One among all the regulatory tools commonly used by regulators to promote and evaluate the commitment of the licensees with safety culture as a whole involves organizational factors and particular attention is directed to the operating organization. This entailed a wide range of activities, including all those related with management of safety performance. Operating Experience Feedback Programme as a tool to enhance safety operation is particularly useful for regulators in the evaluation of the role of S.C. in operating organization. Safety Culture is recognized as a subset of the wider Organizational Culture. Practices that improve organizational effectiveness can also contribute to enhance safety. An effective event investigation methodology is a specific practice, which contributes to a healthy Safety Culture. (author)

  3. 76 FR 35978 - Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT

    Science.gov (United States)

    2011-06-21

    ... Operation Regulations; Connecticut River, Old Lyme, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... Connecticut River at Old Lyme, Connecticut. The deviation is necessary to facilitate scheduled maintenance at... the Connecticut River at mile 3.4, at Old Lyme, Connecticut, has a vertical clearance in the closed...

  4. The Efficiency of the Regulation for Horizontal Mergers Among Electricity Distribution Operators in Norway

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter; Gammeltvedt, Thor Erik

    2015-01-01

    the attractiveness of mergers. Norway is one country having implemented an ex ante regulation for mergers among electricity distribution operators (DSOs). We investigate whether the actual mergers of Norwegian DSOs in the period 1995-2004 can be rationalized as cost saving exercises or whether they should...... to identify plausible pre-merger motivations. We also discuss the possibility to gain from strategic gaming in the regulation. We compare the regulated revenues and the regulated efficiency improvement requirements before and after the mergers. We find limited potential cost gains ex ante but some improvement...

  5. Principal regulations of the Decommissioning Conception of the operating NPPs in Ukraine

    International Nuclear Information System (INIS)

    Litvins'kij, L.L.; Lobach, Yu.M.; Rusyinko, P.M.

    2004-01-01

    The paper contains the review of principal regulations of the Decommissioning Conception of the operating NPPs in Ukraine. There are presented the results of analysis based on the consideration of three possible scenarios of the nuclear power complex development corresponding to the different terms of the unit's lifetime extension. Concept decommissioning decisions are established; the results of strategic planning and long-term forecast of decommissioning activity on the operating NPPs in Ukraine are presented too

  6. 76 FR 9224 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2011-02-17

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... Hackensack River, mile 3.4, at Jersey City, New Jersey. The deviation is necessary to repair structural steel... Bridge, across the Hackensack River at mile 3.4, has a vertical clearance in the closed position of 40...

  7. 76 FR 27250 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2011-05-11

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... Hackensack River, mile 3.4, at Jersey City, New Jersey. The deviation is necessary to repair structural steel... Bridge, across the Hackensack River at mile 3.4, has a vertical clearance in the closed position of 40...

  8. 75 FR 63398 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ

    Science.gov (United States)

    2010-10-15

    ... Operation Regulations; Hackensack River, Jersey City, NJ AGENCY: Coast Guard, DHS. ACTION: Notice of... across the Hackensack River, mile 1.8, at Jersey City, New Jersey. The deviation allows the bridge owner... INFORMATION: The Route 1 & 9 Lincoln Highway Bridge, across the Hackensack River, mile 1.8, at Jersey City...

  9. The regulation of health care providers' payments when horizontal and vertical differentiation matter.

    Science.gov (United States)

    Bardey, David; Canta, Chiara; Lozachmeur, Jean-Marie

    2012-09-01

    This paper analyzes the regulation of payment schemes for health care providers competing in both quality and product differentiation of their services. The regulator uses two instruments: a prospective payment per patient and a cost reimbursement rate. When the regulator can only use a prospective payment, the optimal price involves a trade-off between the level of quality provision and the level of horizontal differentiation. If this pure prospective payment leads to underprovision of quality and overdifferentiation, a mixed reimbursement scheme allows the regulator to improve the allocation efficiency. This is true for a relatively low level of patients' transportation costs. We also show that if the regulator cannot commit to the level of the cost reimbursement rate, the resulting allocation can dominate the one with full commitment. This occurs when the transportation cost is low or high enough, and the full commitment solution either implies full or zero cost reimbursement. Copyright © 2012 Elsevier B.V. All rights reserved.

  10. 75 FR 30750 - Drawbridge Operation Regulation; Arkansas Waterway, Little Rock, AR

    Science.gov (United States)

    2010-06-02

    ...-AA09 Drawbridge Operation Regulation; Arkansas Waterway, Little Rock, AR AGENCY: Coast Guard, DHS... procedures on the Baring Cross Railroad Drawbridge across the Arkansas Waterway at mile 119.6 at Little Rock....123(b) state that the draw of the Baring Cross Railroad Drawbridge, mile 119.6, at Little Rock, AR is...

  11. 78 FR 18481 - Drawbridge Operation Regulations; Inner Harbor Navigation Canal, LA

    Science.gov (United States)

    2013-03-27

    ... regulation governing the operation of the US 90 (Danzinger) vertical lift span drawbridge across the Inner... Lift Span Bridge across the Inner Harbor Navigation Canal, mile 3.10 at New Orleans, Orleans Parish, Louisiana. The bridge has a vertical clearance of 50 feet above mean high water, elevation 5.0 feet Mean Sea...

  12. Implications of environmental regulations on refinery product specification, operation and investment

    International Nuclear Information System (INIS)

    Amin, M.M.

    1992-01-01

    During the 1980s, refiners mainly in OECD countries were occupied with improving their refinery configurations for producing high-value light products which would not only satisfy the product demand slate but also meet the increasingly restrictive environmental regulations. In the 1990s refiners will continue to be challenged to improve the world's air quality not only by producing products that minimize emissions of toxic and hazardous hydrocarbons, but also through the refinery operation itself by investment in upgrading the industry and products to cope with the constant flow of new regulations. These investments will not only be limited to consuming centres but will also be extended to cover exporting refineries as well due to competition of acquiring market shares for product exports. The additional cost will be directly related to product quality and site regulations and will vary from one country to the other. This paper deals mainly with the air pollution and the impact of related environmental issues on the refining industry. Environmental regulations for refinery products in the USA and Europe are examined and international regulations for the tanker industry are noted. (author)

  13. 36 CFR 3.2 - Do other boating laws and regulations apply to me when I operate my boat on park waters?

    Science.gov (United States)

    2010-07-01

    ... regulations apply to me when I operate my boat on park waters? 3.2 Section 3.2 Parks, Forests, and Public... boating laws and regulations apply to me when I operate my boat on park waters? (a) In addition to the.... NPS applies the adopted laws and regulations to vessels and their operation on all waters (navigable...

  14. Configurable memory system and method for providing atomic counting operations in a memory device

    Science.gov (United States)

    Bellofatto, Ralph E.; Gara, Alan G.; Giampapa, Mark E.; Ohmacht, Martin

    2010-09-14

    A memory system and method for providing atomic memory-based counter operations to operating systems and applications that make most efficient use of counter-backing memory and virtual and physical address space, while simplifying operating system memory management, and enabling the counter-backing memory to be used for purposes other than counter-backing storage when desired. The encoding and address decoding enabled by the invention provides all this functionality through a combination of software and hardware.

  15. The 2017 International Joint Working Group White Paper by INDUSEM, the Emergency Medicine Association and the Academic College of Emergency Experts on Establishing Standardized Regulations, Operational Mechanisms, and Accreditation Pathways for Education and Care Provided by the Prehospital Emergency Medical Service Systems in India.

    Science.gov (United States)

    Sikka, Veronica; Gautam, V; Galwankar, Sagar; Guleria, Randeep; Stawicki, Stanislaw P; Paladino, Lorenzo; Chauhan, Vivek; Menon, Geetha; Shah, Vijay; Srivastava, R P; Rana, B K; Batra, Bipin; Kalra, O P; Aggarwal, P; Bhoi, Sanjeev; Krishnan, S Vimal

    2017-01-01

    The government of India has done remarkable work on commissioning a government funded prehospital emergency ambulance service in India. This has both public health implications and an economic impact on the nation. With the establishment of these services, there is an acute need for standardization of education and quality assurance regarding prehospital care provided. The International Joint Working Group has been actively involved in designing guidelines and establishing a comprehensive framework for ensuring high-quality education and clinical standards of care for prehospital services in India. This paper provides an independent expert opinion and a proposed framework for general operations and administration of a standardized, national prehospital emergency medical systems program. Program implementation, operational details, and regulations will require close collaboration between key stakeholders, including local, regional, and national governmental agencies of India.

  16. Improved Ribosome-Footprint and mRNA Measurements Provide Insights into Dynamics and Regulation of Yeast Translation

    Science.gov (United States)

    2016-02-11

    unlimited. Improved Ribosome-Footprint and mRNA Measurements Provide Insights into Dynamics and Regulation of Yeast Translation The views, opinions and...into Dynamics and Regulation of Yeast Translation Report Title Ribosome-footprint profiling provides genome-wide snapshots of translation, but...tend to slow translation. With the improved mRNA measurements, the variation attributable to translational control in exponentially growing yeast was

  17. Optimal Operation and Dispatch of Voltage Regulation Devices Considering High Penetrations of Distributed Photovoltaic Generation

    Energy Technology Data Exchange (ETDEWEB)

    Mather, Barry A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Hodge, Brian S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cho, Gyu-Jung [Sungkyunkwan University; Oh, Yun-Sik [Sungkyunkwan University; Kim, Min-Sung [Sungkyunkwan University; Kim, Ji-Soo [Sungkyunkwan University; Kim, Chul-Hwan [Sungkyunkwan University

    2017-06-29

    Voltage regulation devices have been traditionally installed and utilized to support distribution voltages. Installations of distributed energy resources (DERs) in distribution systems are rapidly increasing, and many of these generation resources have variable and uncertain power output. These generators can significantly change the voltage profile for a feeder; therefore, in the distribution system planning stage of the optimal operation and dispatch of voltage regulation devices, possible high penetrations of DERs should be considered. In this paper, we model the IEEE 34-bus test feeder, including all essential equipment. An optimization method is adopted to determine the optimal siting and operation of the voltage regulation devices in the presence of distributed solar power generation. Finally, we verify the optimal configuration of the entire system through the optimization and simulation results.

  18. 75 FR 78601 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance

    Science.gov (United States)

    2010-12-16

    ... Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance AGENCY: Coast Guard, DHS. ACTION... 3.1, across the Hackensack River, at Jersey City, New Jersey. Under this temporary deviation a two.... SUPPLEMENTARY INFORMATION: The Witt Penn Bridge, across the Hackensack River at mile 3.1 has a vertical...

  19. 76 FR 70345 - Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA

    Science.gov (United States)

    2011-11-14

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2011-1022] Drawbridge Operation Regulations; Elizabeth River, Eastern Branch, Norfolk, VA AGENCY: Coast Guard, DHS. ACTION: Notice... periodic maintenance. The Norfolk Southern 5 Bridge, at mile 1.1, across the Elizabeth River (Eastern...

  20. 78 FR 66265 - Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA

    Science.gov (United States)

    2013-11-05

    ... Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA AGENCY: Coast Guard, DHS. ACTION: Notice... Elizabeth River Eastern Branch, mile 1.1, at Norfolk, VA. This deviation is necessary to facilitate... maintenance. The Norfolk Southern 5 railroad Bridge, at mile 1.1, across the Elizabeth River (Eastern Branch...

  1. 77 FR 20716 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-04-06

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  2. 77 FR 3607 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-01-25

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  3. 76 FR 9223 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2011-02-17

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  4. 77 FR 5398 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2012-02-03

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation...) 366-9826. SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation...

  5. Authentication of an operator-provided containment and surveillance (C and S) system

    International Nuclear Information System (INIS)

    Watkins, L.M.; Rundquist, D.E.

    1987-01-01

    Large multicomponent Operator-provided C and S systems with computer control, such as the pioneering Japanese Fast Critical Assembly Portal Monitor (FCA P/M), can efficiently meet evolving IAEA C and S requirements but they present substantial challenges to the IAEA's need to authenticate the data produced. To authenticate such systems by traditional IAEA methods would require a prohibitive expenditure of resources to ensure that each individual component is provided with credible tamper indication and that the control and interpretation of the data is appropriate. Consequently, in parallel with the FCA P/M field trial currently underway in Japan, the IAEA has initiated a programme aimed at producing resource-efficient and credible authentication of the system. Although initially focused on the P/M system, the methods under consideration are applicable to other similar Operator-provided systems

  6. 76 FR 9224 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2011-02-17

    ... issued a temporary deviation from the regulation governing the operation of the Rock Island Railroad and Highway Drawbridge across the Upper Mississippi River, mile 482.9, at Rock Island, Illinois. The deviation.... SUPPLEMENTARY INFORMATION: The U.S. Army Rock Island Arsenal requested a temporary deviation for the Rock Island...

  7. Low carbon technologies as providers of operational flexibility in future power systems

    International Nuclear Information System (INIS)

    Pavić, Ivan; Capuder, Tomislav; Kuzle, Igor

    2016-01-01

    Highlights: • Mixed integer linear programming model for provision of multiple services from EV. • EV energy and reserve services provision effects on power system operation. • Impacts of conventional unit’s decommission on system’s operation and flexibility. • Assessment of power system’s flexibility under different wind generation polices. - Abstract: The paper presents a unit commitment model, based on mixed integer linear programming, capable of assessing the impact of electric vehicles (EV) on provision of ancillary services in power systems with high share of renewable energy sources (RES). The analyses show how role of different conventional units changes with integration of variable and uncertain RES and how introducing a flexible sources on the demand side, in this case EV, impact the traditional provision of spinning/contingency reserve services. In addition, technical constraints of conventional units, such as nuclear, gas or coal, limit the inherit flexibility of the system which results in curtailing clean renewable sources and inefficient operation. Following on that, sensitivity analyses of operational cost and wind curtailment shows which techno-economic constraints impact the flexibility of the high RES systems the most and how integration of more flexible units or decommission of conventional nuclear, coal and gas driven power plants would impact the system’s operation. Finally, two different wind generation polices (wind penalization and wind turbines as reserve providers) have been analysed in terms of operational flexibility through different stages of conventional unit’s decommission and compared with the same analyses when EV were used as reserve providers.

  8. 78 FR 18849 - Drawbridge Operation Regulations; Saugus River, Saugus and Lynn, MA

    Science.gov (United States)

    2013-03-28

    ... regulation governing the operation of the Route 107 temporary bridge across the Saugus River, mile 2.5, between Saugus and Lynn, Massachusetts. The bridge will not open for vessel traffic during the installation of the moveable span. This deviation allows the bridge to remain closed for six days. DATES: This...

  9. 78 FR 28139 - Drawbridge Operation Regulation; Tuckahoe River, Between Corbin City and Upper Township, NJ

    Science.gov (United States)

    2013-05-14

    ... Operation Regulation; Tuckahoe River, Between Corbin City and Upper Township, NJ AGENCY: Coast Guard, DHS... River, mile 8.0, between Corbin City and Upper Township, NJ. The deviation is necessary to facilitate... operating schedule, the State Highway Bridge, mile 8.0, between Corbin City and Upper Township, NJ shall...

  10. 77 FR 75554 - Drawbridge Operation Regulation; Apalachicola River, FL

    Science.gov (United States)

    2012-12-21

    ... provides unlimited vertical clearance and 119 feet of horizontal clearance in the open-to- navigation.... 12. Energy Effects We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a...

  11. 76 FR 12 - Drawbridge Operation Regulations; New Haven Harbor, Quinnipiac and Mill Rivers, New Haven, CT

    Science.gov (United States)

    2011-01-03

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-1096] Drawbridge Operation Regulations; New Haven Harbor, Quinnipiac and Mill Rivers, New Haven, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, First Coast Guard...

  12. 78 FR 71675 - Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence

    Science.gov (United States)

    2013-11-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0260] Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence The U.S. Nuclear Regulatory Commission (NRC) is issuing this Federal Register notice to inform the public of a slight change in the manner of distribution of publicly available operating reactor licensing...

  13. 76 FR 11959 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance

    Science.gov (United States)

    2011-03-04

    ... Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance AGENCY: Coast Guard, DHS. ACTION... 3.1, across the Hackensack River, at Jersey City, New Jersey. The deviation is necessary to perform... River at mile 3.1 has a vertical clearance in the closed position of 35 feet at mean high water and 40...

  14. 75 FR 81125 - Drawbridge Operation Regulation; Upper Mississippi River, Rock Island, IL

    Science.gov (United States)

    2010-12-27

    ... Operation Regulation; Upper Mississippi River, Rock Island, IL AGENCY: Coast Guard, DHS. ACTION: Notice of... the Upper Mississippi River, mile 481.4, at Rock Island, Illinois. The deviation is necessary to allow... Rock Island, Illinois to open on signal if at least 24 hours advance notice is given for 44 days from...

  15. Arianespace Launch Service Operator Policy for Space Safety (Regulations and Standards for Safety)

    Science.gov (United States)

    Jourdainne, Laurent

    2013-09-01

    Since December 10, 2010, the French Space Act has entered into force. This French Law, referenced as LOS N°2008-518 ("Loi relative aux Opérations Spatiales"), is compliant with international rules. This French Space Act (LOS) is now applicable for any French private company whose business is dealing with rocket launch or in orbit satellites operations. Under CNES leadership, Arianespace contributed to the consolidation of technical regulation applicable to launch service operators.Now for each launch operation, the operator Arianespace has to apply for an authorization to proceed to the French ministry in charge of space activities. In the files issued for this purpose, the operator is able to justify a high level of warranties in the management of risks through robust processes in relation with the qualification maintenance, the configuration management, the treatment of technical facts and relevant conclusions and risks reduction implementation when needed.Thanks to the historic success of Ariane launch systems through its more than 30 years of exploitation experience (54 successes in a row for latest Ariane 5 launches), Arianespace as well as European public and industrial partners developed key experiences and knowledge as well as competences in space security and safety. Soyuz-ST and Vega launch systems are now in operation from Guiana Space Center with identical and proved risks management processes. Already existing processes have been slightly adapted to cope with the new roles and responsibilities of each actor contributing to the launch preparation and additional requirements like potential collision avoidance with inhabited space objects.Up to now, more than 12 Ariane 5 launches and 4 Soyuz-ST launches have been authorized under the French Space Act regulations. Ariane 5 and Soyuz- ST generic demonstration of conformity have been issued, including exhaustive danger and impact studies for each launch system.This article will detail how Arianespace

  16. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  17. 76 FR 3516 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Science.gov (United States)

    2011-01-20

    ... Operation Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION: Notice of temporary..., across the Harlem River, New York City, New York. The deviation is necessary to facilitate bridge... River at mile 0.0 has a vertical clearance in the closed position of 55 feet at mean high water and 60...

  18. 76 FR 40234 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Science.gov (United States)

    2011-07-08

    ...-AA09 Drawbridge Operation Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION... at mile 0.0, across the Harlem River at New York City, New York. This interim rule is necessary to... The 103rd Street (Wards Island) Pedestrian Bridge, across the Harlem River, mile 0.0, at New York City...

  19. 76 FR 79145 - Drawbridge Operation Regulations; Bayou Liberty, Mile 2.0, St. Tammany Parish, Slidell, LA

    Science.gov (United States)

    2011-12-21

    ... proposed rule concerning the regulation governing the operation of the SR 433 Bridge over Bayou Liberty... comments expressing concern with the impact the proposed changes would have on public access to the... on the Internet by going to http://www.regulations.gov , inserting USCG-2010-0972 in the ``Keyword...

  20. 78 FR 63136 - Drawbridge Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA

    Science.gov (United States)

    2013-10-23

    ...-AA09 Drawbridge Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA AGENCY: Coast... 4.6, both at New Orleans, LA. This proposed change would allow for the safe navigation of vessels... Department of Transportation and Development (LDOTD) (representing the New Orleans Levee District which is...

  1. 78 FR 18479 - Drawbridge Operation Regulations; Inner Harbor Navigation Canal, New Orleans, LA

    Science.gov (United States)

    2013-03-27

    ... Operation Regulations; Inner Harbor Navigation Canal, New Orleans, LA AGENCY: Coast Guard, DHS. ACTION... across the Inner Harbor Navigation Canal, mile 4.6, at New Orleans, Louisiana. This deviation is... Seabrook Highway crossing the Inner Harbor Navigation Canal, mile 4.6, in New Orleans, Louisiana. The...

  2. 77 FR 14689 - Drawbridge Operation Regulation; Berwick Bay (Atchafalaya River), Morgan City, LA

    Science.gov (United States)

    2012-03-13

    ... Operation Regulation; Berwick Bay (Atchafalaya River), Morgan City, LA AGENCY: Coast Guard, DHS. ACTION... Fe (BNSF) Railway Company vertical lift span bridge across Berwick Bay, mile 0.4, (Atchafalaya River, mile 17.5) at Morgan City, St. Mary Parish, Louisiana. The deviation is necessary to perform scheduled...

  3. Regulations and instructions for RA reactor operation; Propisi i uputstva za pogon reaktora 'A'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This regulatory guide consists of following 4 chapters: Description of the RA reactor, organization scheme, regulations for performing experiments; Regulations for staff on duty; Instructions for operating the vacuum systems, heavy water and helium systems; and evacuation in case of accident. [Serbo-Croat] Ovaj pravilnik sadrzi sledeca 4 poglavlja: Opis reaktora RA, sema organizacije rada, propisi za izvodjenje eksperimenata; Pravilnik za rad dezurnog osoblja; Uputstva za rada sa vakuum sistemima, sistemom teske vode, sistemom helijuma; evakuacija u slucaju udesa.

  4. Developing an SSAC Self-Assessment Tool for Operators and Regulators

    Energy Technology Data Exchange (ETDEWEB)

    Frazar, Sarah L.; Innes-Jones, Gemma; Hamilton, Ian

    2017-07-17

    Enabling an SSAC to understand why it is performing inefficiently can help it allocate resources more effectively to better support IAEA safeguards implementation. In collaboration with international consulting firm, Environmental Resources Management (ERM) and a U.S. based nuclear fuel cycle facility, the Pacific Northwest National Laboratory (PNNL) has been developing a framework for a future self-assessment tool for nuclear operators and regulators. This paper will describe the effort to date, with particular emphasis on the steps the team took to align the framework with relevant IAEA self-assessment tools.

  5. Interaction of HPP Regulation Operation and Navigation at Water Structures

    OpenAIRE

    Možiešik, Ľudovít; Cabadaj, Roman; Čepcová, Zuzana

    2009-01-01

    Significant impact on navigation operation by hydropower plant (HPP) operation is mostly in diversion channels of hydropower plants, when these channels are used for navigation as well. It is caused by sudden changes in flow rate of hydropower plants, which is connected to providing of support services for electric power system. The objective of the research is to determine limits of acceptable hydropower plant operation or propose precautions which enable harmonization of opposing interests ...

  6. WIPP - Pre-Licensing and Operations: Developer and Regulator Perspectives

    International Nuclear Information System (INIS)

    Peake, Tom; Patterson, R.

    2014-01-01

    The Waste Isolation Pilot Plant (WIPP) is a disposal system for defense-related transuranic (TRU) radioactive waste. Developed by the Department of Energy (DOE), WIPP is located in Southeastern New Mexico: radioactive waste is disposed of 2,150 feet underground in an ancient layer of salt with a total capacity of 6.2 million cubic feet of waste. Congress authorized the development and construction of WIPP in 1980 for the express purpose of providing a research and development facility to demonstrate the safe disposal of radioactive wastes resulting from the defense activities and programs of the United States. This paper makes a historical review of the site development, site operations (waste disposal operations started in 1999), communications between US EPA and DOE, the chronology of pre-licensing and pre-operations, the operational phase and the regulatory challenges, and the lessons learned after 12 years of operations

  7. 75 FR 4693 - Drawbridge Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA

    Science.gov (United States)

    2010-01-29

    ... Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA AGENCY: Coast Guard, DHS. ACTION... C. Simon) Bascule Bridge across the Inner Harbor Navigational Canal, mile 4.6, at New Orleans, LA... Ochsner Ironman 70.3 New Orleans event. This deviation allows the bridge to remain closed during the event...

  8. Report on the service quality incentive regulations for gas network operators and ERDF. 2009-2010 Report Synthesis

    International Nuclear Information System (INIS)

    2010-11-01

    The latest natural gas transmission network tariffs, called 'ATRT4', and the tariffs for natural gas distribution network, 'ATRD3', as well as the 3. tariffs for using the public electricity networks, 'TURPE 3', constitute a regulatory framework offering incentives to gas transmission and distribution operators, as well as the electricity distributor ERDF, to control their costs and improve the quality of service provided for network users. For gas and electricity distribution system operators (DSO), the incentive-based regulation for quality of service implemented through the tariffs is complementary to the supervision powers of the licensing authorities. It operates by means of concession contracts which imply that the concessionaire has to deliver activity reports and that the licensing authorities have to publish monitoring reports of the concessionaire's activity. The licensing authorities act on the local level, whereas the incentive regulation is of national scope. The actions of the licensing authorities and of the Energy Regulatory Commission (CRE) contribute together to assess and enhance the quality of service of the DSO. As the service quality monitoring exercises are conducted successively, the analysis will become more refined as a greater data history is acquired. The quality of service from the gas network operators (GrDF, GRTgaz and TIGF) and the electricity distributor (ERDF) has been improving gradually over the period of the monitoring, or has stabilised at a satisfactory level for the areas that are most important for the correct functioning of the market. Some objectives set by the tariffs have been met or even exceeded, which earns financial bonuses for the operators in question. This second service quality monitoring report on the gas network operators and ERDF is going to be used by the CRE, in consultation with all the market players, to refine the incentive mechanisms already in place. Contents: 1

  9. 78 FR 62439 - Drawbridge Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA

    Science.gov (United States)

    2013-10-22

    ... Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA AGENCY: Coast Guard, DHS. ACTION..../Seabrook) bridge across the IHNC, mile 4.6, both at New Orleans, LA. This deviation will test changes to... Intra-Costal Waterway (GIWW). The US 90 (Danzinger) Bridge across the IHNC, mile 3.1, at New Orleans...

  10. 75 FR 8486 - Drawbridge Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA

    Science.gov (United States)

    2010-02-25

    ... Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA AGENCY: Coast Guard, DHS. ACTION... EHL), at New Orleans, LA. The deviation is necessary to replace the counterweight wire ropes on the... Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and...

  11. 77 FR 46285 - Drawbridge Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA

    Science.gov (United States)

    2012-08-03

    ... Operation Regulation; Inner Harbor Navigational Canal, New Orleans, LA AGENCY: Coast Guard, DHS. ACTION... Navigational Canal, mile 3.1, at New Orleans, LA. The deviation is necessary to replace the wire rope lifting... of the US 90 (Danzinger) Bridge across the Inner Harbor Navigational Canal, mile 3.1, at New Orleans...

  12. International Benchmarking of Electricity Transmission System Operators

    DEFF Research Database (Denmark)

    Agrell, Per J.; Bogetoft, Peter

    2014-01-01

    Electricity transmission system operators (TSO) in Europe are increasing subject to high-powered performance-based regulation, such as revenue-cap regimes. The determination of the parameters in such regimes is challenging for national regulatory authorities (NRA), since there is normally a single...... TSO operating in each jurisdiction. The solution for European regulators has been found in international regulatory benchmarking, organized in collaboration with the Council of European Energy Regulators (CEER) in 2008 and 2012 for 22 and 23 TSOs, respectively. The frontier study provides static cost...... weight restrictions and a correction method for opening balances....

  13. LORETA Neurofeedback in the Precuneus: Operant Conditioning in Basic Mechanisms of Self-Regulation.

    Science.gov (United States)

    Cannon, Rex L; Baldwin, Debora R; Diloreto, Dominic J; Phillips, Sherman T; Shaw, Tiffany L; Levy, Jacob J

    2014-10-01

    Low-resolution brain electomagnetic tomography (LORETA) neurofeedback provides a mechanism to influence the electrical activity of the brain in intracranial space. The aim of this study was to determine the effects of LORETA neurofeedback (LNFB) in the precuneus as a mechanism for improving self-regulation in controls and a heterogeneous diagnostic group (DX). Thirteen participants completed between 10 and 20 sessions of LNFB training in a 3-voxel cluster in the left precuneus. The participants included 5 nonclinical university students, and 8 adults with heterogeneous psychiatric diagnoses. We assessed the effects of LNFB with neurophysiological measures as well as pre- and post-Personality Assessment Inventory (PAI) subscales and selected subtests from the Delis-Kaplan Executive Function System (DKEFS). There was a significant total relative power increase at the precuneus for baseline contrasts for the control group. The DX group did not reach significant levels. All participants showed improvements in executive functions and tended to report significantly less psychopathology. The basic neural mechanisms of self-regulation are poorly understood. The data obtained in this study demonstrate that LNFB in a heterogeneous population enhances executive functions while concordantly decreasing endorsement of psychological symptoms. The alpha frequency in the brain may represent integrative functioning relative to operant efficiency and self-regulatory mechanisms. © EEG and Clinical Neuroscience Society (ECNS) 2014.

  14. 77 FR 6007 - Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation...

    Science.gov (United States)

    2012-02-07

    ...] Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation... they could be published in the Federal Register. This notice lists temporary safety zones, security... the safety and security needs within their jurisdiction; therefore, District Commanders and COTPs have...

  15. 76 FR 69131 - Drawbridge Operation Regulation; Lake Washington Ship Canal, Seattle, WA

    Science.gov (United States)

    2011-11-08

    ...The Commander, Thirteenth Coast Guard District, has issued a temporary deviation from the regulation governing the operation of the Burlington Northern Santa Fe Railway Bridge across the Lake Washington Ship Canal, mile 0.1, at Seattle, WA. The deviation is necessary to facilitate replacement of a counterweight trunnion bearing. This deviation allows the bridge to remain in the down or closed position during the maintenance period.

  16. 76 FR 8653 - Drawbridge Operation Regulation; Gulf Intracoastal Waterway, New Orleans Harbor, Inner Harbor...

    Science.gov (United States)

    2011-02-15

    ... Operation Regulation; Gulf Intracoastal Waterway, New Orleans Harbor, Inner Harbor Navigation Canal, New Orleans, Orleans Parish, LA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from... Lock), at New Orleans, Orleans Parish, Louisiana. This deviation is necessary to replace all of the...

  17. 75 FR 78601 - Drawbridge Operation Regulation; Gulf Intracoastal Waterway, New Orleans Harbor, Inner Harbor...

    Science.gov (United States)

    2010-12-16

    ... Operation Regulation; Gulf Intracoastal Waterway, New Orleans Harbor, Inner Harbor Navigation Canal, New Orleans, Orleans Parish, LA AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from... Harvey Lock), at New Orleans, Orleans Parish, Louisiana. This deviation is necessary to adjust the...

  18. 76 FR 70342 - Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation...

    Science.gov (United States)

    2011-11-14

    ...] Quarterly Listings; Safety Zones, Security Zones, Special Local Regulations, Drawbridge Operation... published in the Federal Register. This notice lists temporary safety zones, security zones, special local... Commanders and Captains of the Port (COTP) must be immediately responsive to the safety and security needs...

  19. Control and Regulation of Private Security Providers in Latin America and the Caribbean: A Comparative Analysis

    Directory of Open Access Journals (Sweden)

    Francesca Caonero

    2014-05-01

    Full Text Available States and different international players have drafted legal frameworks to adequately regulate the phenomenon of privatization of security. Among these initiatives is the Project for a Possible Convention on Private Military and Security Companies, prepared with guidance from the United Nations Human Rights Council. The objective of this proposed convention is to provide a universal framework to regulate these companies.The United Nations Regional Center for Peace, Disarmament and Development in Latin America and the Caribbean (UNLIREC has studied this Proposed Convention and contrasted it with existing national regulations. The objective of this study is to identify whether and how States already comply with some of the provisions contained in this proposal.Based on the study of national private security law, UNLIREC has contrasted it with the Convention Proposal identifying the different items in this document that are referred to in the different national regulations from various countries in Latin America and the Caribbean.As a result of this legal contrast, it can be observed that laws in some States in the region include significant legal aspects put forth in the Proposed Convention, such as licenses, registry and training. Other States go beyond that, stipulating specific regulations that can be noted. Others, on the contrary, lack any provisions regarding control and regulation of private security providers.DOI: http://dx.doi.org/10.5377/rpsp.v1i1.1392

  20. The ionising radiation (medical exposure) regulations - IR (ME) R, Malta

    International Nuclear Information System (INIS)

    Desai, R.; Brejza, P.; Cremona, J.

    2004-01-01

    framework of procedures for medical exposures. Asole practitioner is required to establish and follow his own procedures. The employer's guidelines must cover the matters set out in regulations 9.1.1 to 9.1.12. It also requires the employer to establish written protocols for standard radiological practices, recommendations concerning referral criteria, quality assurance programmes for standard operating procedures, diagnostic reference levels, appropriate guidance and dose constrains for helpers and medical research programmes. It also requires investigations of incidents suspecting that a patient may have received a radiation dose much greater than intended. 10. Regulation 10 requires the practitioner and operator to comply with the employer's procedures. 11. Regulation 11 provides list of duties of practitioner, referrer and operator. 12. Regulation 12 provides optimisation of procedures so as to ensure that exposure is kept as low as reasonably practicable. The practitioner and the operator are responsible for the optimisation of medical exposures as specified in this regulation. This regulation provides that special attention be given to exposure in (i) medico-legal procedures (ii) health screening or voluntary participation in research where no direct medical benefit is expected from the exposure or where exposure involves high doses, (iii) pregnant or potentially pregnant women (iv) breast-feeding females (v) children. This regulation also provides that certain written instruction and information be given where radioactive medicinal products are administered. 13. Regulation 13 provides for medical physics experts to be consulted where appropriate. 14. Regulation 14 prohibits a practitioner or operator from carrying out a medical procedure without having been adequately trained and requires the employer to keep a record of training qualifications of all practitioners and operators engaged by him. 15. Regulation 15 requires the employer to maintain an inventory of

  1. Operator licensing examiner standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining licensees and applicants for reactor operator and senior reactor operator licenses at power reactor facilities pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). The Examiner Standards are intended to assist NRC examiners and facility licensees to better understand the initial and requalification examination processes and to ensure the equitable and consistent administration of examinations to all applicants. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator licensing policy changes. Revision 7 was published in January 1993 and became effective in August 1993. Supplement 1 is being issued primarily to implement administrative changes to the requalification examination program resulting from the amendment to 10 CFR 55 that eliminated the requirement for every licensed operator to pass an NRC-conducted requalification examination as a condition for license renewal. The supplement does not substantially alter either the initial or requalification examination processes and will become effective 30 days after its publication is noticed in the Federal Register. The corporate notification letters issued after the effective date will provide facility licensees with at least 90 days notice that the examinations will be administered in accordance with the revised procedures

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  3. A review of healthy condition for reactor operators of NPP

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhu Lixin; Zhou Limin

    2008-01-01

    Physical health is one of fundamental elements and the necessary qualification for holding operator license or senior operator license of a nuclear power plant issued by NNSA. Based upon requirements for healthy qualification of reactor operators in nuclear safety regulations and some new issued regulations, especially some involved national standard (GB), review direction, relevant contents and criteria were described, and some suggestions were provided in this paper. (authors)

  4. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  5. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  6. Regulating manure application discharges from concentrated animal feeding operations in the United States

    International Nuclear Information System (INIS)

    Centner, Terence J.; Feitshans, Theodore A.

    2006-01-01

    In the United States, reducing pollution from agriculture has received attention due to data suggesting that this is the leading source of impairment of many waterbodies. The federal government revised its regulations governing concentrated animal feeding operations (CAFOs) to enhance governmental oversight over sources of pollution. For the application of manure resulting in pollutant discharges, CAFOs need to implement nutrient management plans. A federal court affirmed the ability of the US federal government to oversee the application of manure from CAFOs that have discharges. Simultaneously, owners and operators of CAFOs who have implemented an appropriate nutrient management plan may forgo securing a permit if their discharges qualify under the agricultural stormwater discharge exemption. - New rules applying to the application of manure by large concentrated animal feeding operations should reduce water contamination

  7. Genome-wide investigation of transcription factors provides insights into transcriptional regulation in Plutella xylostella.

    Science.gov (United States)

    Zhao, Qian; Ma, Dongna; Huang, Yuping; He, Weiyi; Li, Yiying; Vasseur, Liette; You, Minsheng

    2018-04-01

    Transcription factors (TFs), which play a vital role in regulating gene expression, are prevalent in all organisms and characterization of them may provide important clues for understanding regulation in vivo. The present study reports a genome-wide investigation of TFs in the diamondback moth, Plutella xylostella (L.), a worldwide pest of crucifers. A total of 940 TFs distributed among 133 families were identified. Phylogenetic analysis of insect species showed that some of these families were found to have expanded during the evolution of P. xylostella or Lepidoptera. RNA-seq analysis showed that some of the TF families, such as zinc fingers, homeobox, bZIP, bHLH, and MADF_DNA_bdg genes, were highly expressed in certain tissues including midgut, salivary glands, fat body, and hemocytes, with an obvious sex-biased expression pattern. In addition, a number of TFs showed significant differences in expression between insecticide susceptible and resistant strains, suggesting that these TFs play a role in regulating genes related to insecticide resistance. Finally, we identified an expansion of the HOX cluster in Lepidoptera, which might be related to Lepidoptera-specific evolution. Knockout of this cluster using CRISPR/Cas9 showed that the egg cannot hatch, indicating that this cluster may be related to egg development and maturation. This is the first comprehensive study on identifying and characterizing TFs in P. xylostella. Our results suggest that some TF families are expanded in the P. xylostella genome, and these TFs may have important biological roles in growth, development, sexual dimorphism, and resistance to insecticides. The present work provides a solid foundation for understanding regulation via TFs in P. xylostella and insights into the evolution of the P. xylostella genome.

  8. Operating experience: safety perspective

    International Nuclear Information System (INIS)

    Piplani, Vivek; Krishnamurthy, P.R.; Kumar, Neeraj; Upadhyay, Devendra

    2015-01-01

    Operating Experience (OE) provides valuable information for improving NPP safety. This may include events, precursors, deviations, deficiencies, problems, new insights to safety, good practices, lessons and corrective actions. As per INSAG-10, an OE program caters as a fundamental means for enhancing the defence-in-depth at NPPs and hence should be viewed as ‘Continuous Safety Performance Improvement Tool’. The ‘Convention on Nuclear Safety’ also recognizes the OE as a tool of high importance for enhancing the NPP safety and its Article 19 mandates each contracting party to establish an effective OE program at operating NPPs. The lessons drawn from major accidents at Three Mile Island, Chernobyl and Fukushima Daiichi NPPs had prompted nuclear stalwarts to change their safety perspective towards NPPs and to frame sound policies on issues like safety culture, severe accident prevention and mitigation. An effective OE program, besides correcting current/potential problems, help in proactively improving the NPP design, operating and maintenance procedures, practices, training, etc., and thus plays vital role in ensuring safe and efficient operation of NPPs. Further it enhances knowledge with regard to equipment operating characteristics, system performance trends and provides data for quantitative and qualitative safety analysis. Besides all above, an OE program inculcates a learning culture in the organisation and thus helps in continuously enhancing the expertise, technical competency and knowledge base of its staff. Nuclear and Radiation Facilities in India are regulated by Atomic Energy Regulatory Board (AERB). Operating Plants Safety Division (OPSD) of AERB is involved in managing operating experience activities. This paper provides insights about the operating experience program of OPSD, AERB (including its on-line data base namely OPSD STAR) and its utilisation in improving the regulations and safety at Indian NPPs/projects. (author)

  9. Regulations of 1 September 1978 on the issue of licences to operators of nuclear facilities

    International Nuclear Information System (INIS)

    1978-01-01

    These regulations were published in the Turkish Official Gazette of 1 September 1978. Their purpose is to regulate the granting of licences to authorised technicians and approved operators in accordance with Decree No. 7/9141 of 1975. They lay down the procedure for applying for a licence, the conditions to be complied with, the documents to be supplied and the exemptions from such licensing requirements. Finally, they establish the period of validity of the licences and the procedures for their renewal. (NEA) [fr

  10. Critical analysis of mechanisms of incentive regulation operators of electricity and natural gas networks and infrastructures. Final report. Public version, 23 November 2015

    International Nuclear Information System (INIS)

    2015-01-01

    As the first mechanisms of incentive regulation of electricity and gas network operators have been introduced by the French Commission for Energy Regulation (CRE) since 2008 (the report recalls the main objectives of these mechanisms and their consequences), this report proposes a critical analysis of such mechanisms related to investments and to exploitation expenses of operators and which have been implemented in Germany, Spain, Ireland and in the United Kingdom. For each country, the report proposes a detailed description of these mechanisms for the electric power sector and the gas sector (general overview of the regulation framework, objectives, determination of the authorised income, shift processing, specific incentive mechanisms, modalities of management by the regulator), and a feedback of the different concerned actors (operators and regulators). The last part proposes a description of the status of the French regulation, and an analysis of transposition of the four foreign regulations, and states some propositions for evolutions (objectives, overview of recommended evolutions, focus on three types of regulation evolution: processing of arbitral charges, processing of other incited capital charges, processing of arbitral charges)

  11. De-regulated electric power markets and operating nuclear power plants: the case of British energy

    International Nuclear Information System (INIS)

    Hewlett, James G.

    2005-01-01

    One issue addressed in almost all electric power restructuring/de-regulation plans in both the United States (US) and the United Kingdom (UK) was the recovery of operating nuclear power plant's spent fuel disposal costs and the expenditures to decommission the units when they are retired. Prior to restructuring, in theory at least, in both countries, electricity consumers were paying for the back end costs from operating nuclear power plants. Moreover, in virtually all cases in the US, states included special provisions to insure that consumers would continue to do so after power markets were de-regulated. When power markets in the UK were initially restructured/de-regulated and nuclear power privatized, the shareholders of British Energy (BE) were initially responsible for these costs. However, after electricity prices fell and BE collapsed, the British government shifted many of the costs to future taxpayers, as much as a century forward. If this was not done, the book value of BE's equity would have been about -3.5 billion pounds. That is, BE's liabilities would have been about -3.5 billion pounds greater than their assets. It is difficult to see how BE could remain viable under such circumstances

  12. 77 FR 24147 - Drawbridge Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO

    Science.gov (United States)

    2012-04-23

    ... Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO AGENCY: Coast Guard, DHS. ACTION: Notice... River, mile 359.4, at Kansas City, Missouri. The deviation is necessary to allow the replacement of... Railroad Drawbridge, across the Missouri River, mile 359.4, at Kansas City, Missouri to remain in the...

  13. Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation – Challenges for a New Regulatory Body

    International Nuclear Information System (INIS)

    Viktorsson, C.

    2016-01-01

    Following an introduction with a description of the peaceful nuclear energy program in the United Arab Emirates (UAE) and an overview of the regulatory framework for safety, security and safeguards, this paper describes the regulatory approach for oversight of construction and the granting of an Operating Licence for the first nuclear power plant in the UAE. The paper describes the inspection programme set up by the Federal Authority for Nuclear Regulation (FANR) to verify construction and preoperational testing by the licensee. Moreover, it outlines the content of the operating licence application and focus areas for the regulatory review and assessment. Also, the paper describes the basic elements required by FANR for the decision-making regarding the issuance of the Operating Licence including integration of the results of review and assessment and the implementation of a systematic inspection programme to ensure operational readiness to operate and maintain the plant in accordance with FANR regulations. Finally, the paper addresses the preparation for regulatory oversight and the skill-set needed at FANR to ensure an effective and efficient oversight of safety, security of the nuclear energy power in the UAE. (author)

  14. 75 FR 76688 - Drawbridge Operation Regulation; Isle of Wight (Sinepuxent) Bay, Ocean City, MD

    Science.gov (United States)

    2010-12-09

    ..., mile 0.5, at Ocean City, with a vertical clearance of 13 feet above mean high tide in the closed...-AA09 Drawbridge Operation Regulation; Isle of Wight (Sinepuxent) Bay, Ocean City, MD AGENCY: Coast... Ocean City, MD. This proposed rule will require any mariner requesting an opening in the evening hours...

  15. 77 FR 72737 - Drawbridge Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO

    Science.gov (United States)

    2012-12-06

    ... Operation Regulation; Mile 359.4, Missouri River, Kansas City, MO AGENCY: Coast Guard, DHS. ACTION: Notice... River, mile 359.4, at Kansas City, Missouri. The deviation is necessary to allow the replacement of 64... deviation for the Harry S. Truman Railroad Drawbridge, across the Missouri River, mile 359.4, at Kansas City...

  16. 77 FR 75917 - Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT

    Science.gov (United States)

    2012-12-26

    ...-AA09 Drawbridge Operation Regulation; New Haven Harbor, Quinnipiac and Mill Rivers, CT AGENCY: Coast..., mile 1.3, across the Quinnipiac River, and the Chapel Street Bridge, mile 0.4, across the Mill River..., across the Quinnipiac River, and the Chapel Street Bridge, mile 0.4, across the Mill River, to reduce the...

  17. 78 FR 42010 - Drawbridge Operation Regulation; Isle of Wight (Sinepuxent) Bay, Ocean City, MD

    Science.gov (United States)

    2013-07-15

    .... ADDRESSES: The docket for this deviation [USCG-2013-0469] is available at http:// www.regulations.gov . Type... Operations, telephone 202-366-9826. SUPPLEMENTARY INFORMATION: OC Tri Running Sports, on behalf of Maryland... 4,000 runners and 6,000 spectators. The OC Tri Sports is extending the course to 13.1 miles to...

  18. Operation of neat pine oil biofuel in a diesel engine by providing ignition assistance

    International Nuclear Information System (INIS)

    Vallinayagam, R.; Vedharaj, S.; Yang, W.M.; Lee, P.S.

    2014-01-01

    Highlights: • Operational feasibility of neat pine oil biofuel has been examined. • Pine oil suffers lower cetane number, which mandates for necessary ignition assistance. • Ignition support is provided by preheating the inlet air and incorporating a glow plug. • At an inlet air temperature of 60 °C, the BTE for pine oil was found to be in par with diesel. • CO and smoke emissions were reduced by 13.2% and 16.8%, respectively, for neat pine oil. - Abstract: The notion to provide ignition support for the effective operation of lower cetane fuels in a diesel engine has been ably adopted in the present study for the sole fuel operation of pine oil biofuel. Having noted that the lower cetane number and higher self-ignition temperature of pine oil biofuel would inhibit its direct use in a diesel engine, combined ignition support in the form of preheating the inlet air and installing a glow plug in the cylinder head has been provided to improve the auto-ignition of pine oil. While, an air preheater, installed in the inlet manifold of the engine, preheated the inlet air so as to provide ignition assistance partially, the incorporation of glow plug in the cylinder head imparted the further required ignition support appropriately. Subsequently, the operational feasibility of neat pine oil biofuel has been examined in a single cylinder diesel engine and the engine test results were analyzed. From the experimental investigation, though the engine performance and emissions such as CO (carbon monoxide) and smoke were noted to be better for pine oil with an inlet air temperature of 40 °C, the engine suffered the setback of knocking due to delayed SOC (start of combustion). However, with the ignition support through glow plug and preheating of inlet air, the engine knocking was prevented and the normal operation of the engine was ensured. Categorically, at an inlet air temperature of 60 °C, BTE (brake thermal efficiency) was found to be in par with diesel, while

  19. 30 CFR 778.11 - Providing applicant and operator information.

    Science.gov (United States)

    2010-07-01

    ... operator, if different from the applicant. (4) Each business entity in the applicant's and operator's organizational structure, up to and including the ultimate parent entity of the applicant and operator; for every... are corporations, partnerships, associations, sole proprietorships, or other business entities; (2...

  20. Co-operative approaches to regulation

    National Research Council Canada - National Science Library

    Huigen, Hans; Organisation for Economic Co-operation and Development

    1997-01-01

    ... from traditional command-and-control regulation. The case studies are organized according to a common framework designed to give information about the specific design and use of the alternative, positive and negative results, and more generally...

  1. Peak regulation right

    International Nuclear Information System (INIS)

    Gao, Z. |; Ren, Z.; Li, Z.; Zhu, R.

    2005-01-01

    A peak regulation right concept and corresponding transaction mechanism for an electricity market was presented. The market was based on a power pool and independent system operator (ISO) model. Peak regulation right (PRR) was defined as a downward regulation capacity purchase option which allowed PRR owners to buy certain quantities of peak regulation capacity (PRC) at a specific price during a specified period from suppliers. The PRR owner also had the right to decide whether or not they would buy PRC from suppliers. It was the power pool's responsibility to provide competitive and fair peak regulation trading markets to participants. The introduction of PRR allowed for unit capacity regulation. The PRR and PRC were rated by the supplier, and transactions proceeded through a bidding process. PRR suppliers obtained profits by selling PRR and PRC, and obtained downward regulation fees regardless of whether purchases are made. It was concluded that the peak regulation mechanism reduced the total cost of the generating system and increased the social surplus. 6 refs., 1 tab., 3 figs

  2. Evaluation of different operational strategies for lithium ion battery systems connected to a wind turbine for primary frequency regulation and wind power forecast accuracy improvement

    Energy Technology Data Exchange (ETDEWEB)

    Swierczynski, Maciej; Stroe, Daniel Ioan; Stan, Ana Irina; Teodorescu, Remus; Andreasen, Soeren Juhl [Aalborg Univ. (Denmark). Dept. of Energy Technology

    2012-07-01

    High penetration levels of variable wind energy sources can cause problems with their grid integration. Energy storage systems connected to wind turbine/wind power plants can improve predictability of the wind power production and provide ancillary services to the grid. This paper investigates economics of different operational strategies for Li-ion systems connected to wind turbines for wind power forecast accuracy improvement and primary frequency regulation. (orig.)

  3. The economic value of the climate regulation ecosystem service provided by the Amazon rainforest

    Science.gov (United States)

    Heil Costa, Marcos; Pires, Gabrielle; Fontes, Vitor; Brumatti, Livia

    2017-04-01

    The rainy Amazon climate allowed important activities to develop in the region as large rainfed agricultural lands and hydropower plants. The Amazon rainforest is an important source of moisture to the regional atmosphere and helps regulate the local climate. The replacement of forest by agricultural lands decreases the flux of water vapor into the atmosphere and changes the precipitation patterns, which may severely affect such economic activities. Assign an economic value to this ecosystem service may emphasize the significance to preserve the Amazon rainforest. In this work, we provide a first approximation of the quantification of the climate regulation ecosystem service provided by the Amazon rainforest using the marginal production method. We use climate scenarios derived from Amazon deforestation scenarios as input to crop and runoff models to assess how land use change would affect agriculture and hydropower generation. The effects of forest removal on soybean production and on cattle beef production can both be as high as US 16 per year per ha deforested, and the effects on hydropower generation can be as high as US 8 per year per ha deforested. We consider this as a conservative estimate of a permanent service provided by the rainforest. Policy makers and other Amazon agriculture and energy businesses must be aware of these numbers, and consider them while planning their activities.

  4. Physical protection of nuclear materials: Experience in regulation, implementation and operations. Proceedings of a conference

    International Nuclear Information System (INIS)

    1998-01-01

    The conference was held at IAEA Headquarters in Vienna from 10 to 14 November 1997. It was attended by 162 registered participants from 42 countries and eight international organizations. The 58 papers presented dealt with the experience of regulators, designers and facility operators, including response forces, in meeting the demands and requirements in this changing area of physical protection of nuclear materials and facilities. Individual abstracts were prepared for each of the papers. Topics covered include contemporary and emerging issues, experience in regulation, implementation at facilities, program assessment and cooperation, hardware and software, illicit trafficking in nuclear materials, and transportation

  5. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  9. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  10. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  12. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  13. Integrated real-time information to use in commercial, logistics and operational activities provide by the national control center operation of Transpetro

    Energy Technology Data Exchange (ETDEWEB)

    Aniceto, Hello A. R. [National Control Center Operation Transpetro, Rio de Janeiro, (Brazil)

    2010-07-01

    TRANSPETRO needed real time computational tools to manage its commercial, logistics and operational activities more efficiently. TRANSPETRO's National Control Center Operation developed an information site that provides information in real time on the process plans involved in each operation, using a Plant Information Management System (PIMS). SCADA systems were introduced during 2009 and 2010. This paper reports on the global introduction of the site and its basic architecture. Every screen displays the overall data in real time on movement in volume in pipeline operated by TRANSPETRO. The products transported are tracked for each infrastructure and are shown on dynamic geographic maps. Applications have been developed to improve the quality of information available to customers. It was found that the development of this site using PIMS technology brought gains in support to decision-making at the strategic and tactical levels for TRANSPETRO.

  14. PROVIDING QUALITY OF ELECTRIC POWER IN ELECTRIC POWER SYSTEM IN PARALLEL OPERATION WITH WIND TURBINE

    Directory of Open Access Journals (Sweden)

    Yu. A. Rolik

    2016-01-01

    Full Text Available The problem of providing electric power quality in the electric power systems (EPS that are equipped with sufficiently long air or cable transmission lines is under consideration. This problem proved to be of particular relevance to the EPS in which a source of electrical energy is the generator of wind turbines since the wind itself is an instable primary energy source. Determination of the degree of automation of voltage regulation in the EPS is reduced to the choice of methods and means of regulation of power quality parameters. The concept of a voltage loss and the causes of the latter are explained by the simplest power system that is presented by a single-line diagram. It is suggested to regulate voltage by means of changing parameters of the network with the use of the method of reducing loss of line voltage by reducing its reactance. The latter is achieved by longitudinal capacitive compensation of the inductive reactance of the line. The effect is illustrated by vector diagrams of currents and voltages in the equivalent circuits of transmission lines with and without the use of longitudinal capacitive compensation. The analysis of adduced formulas demonstrated that the use of this method of regulation is useful only in the systems of power supply with a relatively low power factor (cosφ < 0.7 to 0.9. This power factor is typical for the situation of inclusion the wind turbine with asynchronous generator in the network since the speed of wind is instable. The voltage regulation fulfilled with the aid of the proposed method will make it possible to provide the required quality of the consumers’ busbars voltage in this situation. In is turn, it will make possible to create the necessary conditions for the economical transmission of electric power with the lowest outlay of reactive power and the lowest outlay of active power losses.

  15. Mycotoxins: Risks, regulations and European co-operation

    Directory of Open Access Journals (Sweden)

    Van Egmond Hans P.

    2013-01-01

    Full Text Available Mycotoxins and mycotoxicises have been problems of the past and the present, but scientific attention for mycotoxins did not start until the early 1960’s. Nowa­days, many mycotoxins are known, and their occurrence in food and animal feed may cause various adverse effects on human and animal health, including carcinogenic, hepatotoxic, immunotoxic, nephrotoxic, neurotoxic, oestrogenic and teratogenic effects. Some important mycotoxins include the aflatoxins, ochratoxin A, the fumonisins and the trichothecenes, and their significance is briefly described. To protect human and animal health, many countries have enacted specific regulations for mycotoxins in food and animal feed. Risk assessment is a major factor for scientific underpinning of regulations, but other factors such as availability of adequate sampling and analysis procedures also play an important a role in the establishment of mycotoxin regulations. In addition, socio-economic factors such as cost-benefit considerations, trade issues and sufficiency of food supply are equally important in the decision-taking process to come to meaningful regulations. Nowadays, more than 100 countries have formal mycotoxin regulations for food and feed. The mycotoxin regulations are the most stringent in the EU, where various organizations and pan-European networks contribute to combat the mycotoxin problem. It is to be expected that mycotoxins will stay with us in the future and climate change might have a negative influence in this respect. Several possibilities exist to mitigate the problems caused by mycotoxins. In particular prevention of mould growth and mycotoxin formation is key to the control of mycotoxins.

  16. Real option valuation of a decremental regulation service provided by electricity storage.

    Science.gov (United States)

    Szabó, Dávid Zoltán; Martyr, Randall

    2017-08-13

    This paper is a quantitative study of a reserve contract for real-time balancing of a power system. Under this contract, the owner of a storage device, such as a battery, helps smooth fluctuations in electricity demand and supply by using the device to increase electricity consumption. The battery owner must be able to provide immediate physical cover, and should therefore have sufficient storage available in the battery before entering the contract. Accordingly, the following problem can be formulated for the battery owner: determine the optimal time to enter the contract and, if necessary, the optimal time to discharge electricity before entering the contract. This problem is formulated as one of optimal stopping, and is solved explicitly in terms of the model parameters and instantaneous values of the power system imbalance. The optimal operational strategies thus obtained ensure that the battery owner has positive expected economic profit from the contract. Furthermore, they provide explicit conditions under which the optimal discharge time is consistent with the overall objective of power system balancing. This paper also carries out a preliminary investigation of the 'lifetime value' aggregated from an infinite sequence of these balancing reserve contracts. This lifetime value, which can be viewed as a single project valuation of the battery, is shown to be positive and bounded. Therefore, in the long run such reserve contracts can be beneficial to commercial operators of electricity storage, while reducing some of the financial and operational risks in power system balancing.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).

  17. TOWARD MORE EFFECTIVE REGULATION

    Energy Technology Data Exchange (ETDEWEB)

    J. GRAF

    2000-06-01

    This paper proposes a model relationship between the operator engaged in a hazardous activity, the regulator of that activity, and the general public. The roles and responsibilities of each entity are described in a way that allows effective communication flow. The role of the regulator is developed using the steam boiler as an example of a hazard subject to regulation; however, the model applies to any regulated activity. In this model the safety analyst has the extremely important role of communicating sometimes difficult technical information to the regulator in a way that the regulator can provide credible assurance to the general public as to the adequacy of the control of the hazardous activity. The conclusion asserts that acceptance of the model, understanding of the roles and responsibilities and definition of who communicates what information to whom will mitigate frustration on the part of each of the three entities.

  18. Development of a new fluorescent reporter:operator system: location of AraC regulated genes in Escherichia coli K-12.

    Science.gov (United States)

    Sellars, Laura E; Bryant, Jack A; Sánchez-Romero, María-Antonia; Sánchez-Morán, Eugenio; Busby, Stephen J W; Lee, David J

    2017-08-03

    In bacteria, many transcription activator and repressor proteins regulate multiple transcription units that are often distally distributed on the bacterial genome. To investigate the subcellular location of DNA bound proteins in the folded bacterial nucleoid, fluorescent reporters have been developed which can be targeted to specific DNA operator sites. Such Fluorescent Reporter-Operator System (FROS) probes consist of a fluorescent protein fused to a DNA binding protein, which binds to an array of DNA operator sites located within the genome. Here we have developed a new FROS probe using the Escherichia coli MalI transcription factor, fused to mCherry fluorescent protein. We have used this in combination with a LacI repressor::GFP protein based FROS probe to assess the cellular location of commonly regulated transcription units that are distal on the Escherichia coli genome. We developed a new DNA binding fluorescent reporter, consisting of the Escherichia coli MalI protein fused to the mCherry fluorescent protein. This was used in combination with a Lac repressor:green fluorescent protein fusion to examine the spatial positioning and possible co-localisation of target genes, regulated by the Escherichia coli AraC protein. We report that induction of gene expression with arabinose does not result in co-localisation of AraC-regulated transcription units. However, measurable repositioning was observed when gene expression was induced at the AraC-regulated promoter controlling expression of the araFGH genes, located close to the DNA replication terminus on the chromosome. Moreover, in dividing cells, arabinose-induced expression at the araFGH locus enhanced chromosome segregation after replication. Regions of the chromosome regulated by AraC do not colocalise, but transcription events can induce movement of chromosome loci in bacteria and our observations suggest a role for gene expression in chromosome segregation.

  19. Becoming a refinery leader by changing operations to match new product quality regulations

    Energy Technology Data Exchange (ETDEWEB)

    Mendez, Maryro P. [KBC Advanced Technologies, Surrey (United Kingdom)

    2012-07-01

    Global environmental concerns have forced the automotive and oil industries to increase efficiency and reduce emissions, which has led to the tightening of fuels specifications around the world. The implementation of ultra-low sulphur transport fuels has become a worldwide trend with growing momentum. Compliance with these standards requires the refiner to make decisions in advance of the implementation date. Therefore, in order to make changes on time, refiners are currently assessing options and changes required to comply with regulations by 2016. Similar regulations have been implemented in Europe already and KBC has the methodology and experience to assess the existing refinery configuration, unit capability and facility infrastructure to provide the basis for decision making. This paper focus on KBC's methodology which looks at the molecular management needed to produce the low levels of sulfur and toxic required in today's refined products. A key element to the study is the use of Petro-SIM for development of a representative detailed non-linear model, of the refinery which has been used to test ideas and configurations and help confirm the Refinery LP development activities. Using a Petro-SIM representation, KBC is able to make an assessment of the impact of imposing Tier 3 gasoline (sulphur to < 10 ppm) on the refinery, examining critical blending constraints, unused stream qualities and quantities and likely type and scale of capital investment that would be required while optimising unit operations and maximising margins. This paper illustrates KBC's current thinking based on studies done to date to review clean fuels and Tier 3 specifications options for specific refinery configurations. (author)

  20. A study for good regulation of the CANDU's in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Se Ki; Shin, Y. K.; Joe, S. K.; Kim, J. S.; Yu, Y. J.; Lee, Y. J. [Ajou Univ., Suwon (Korea, Republic of)

    2002-03-15

    The objective of project is to derive the policy recommendations to improve the efficiency of CANDU plants regulation. These policy recommendations will eventually contribute to the upgrading of Korean nuclear regulatory system and safety enhancement. During the second phase of this 2 years study, following research activities were done. Review the technical basis and framework of the new Canadian Regulation System and IAEA. Analysis on the interview of Wolsung operation staffs to identify important safety issues and regulation problems experienced at operation. Providing a plan of CANDU regulation system enhancement program.

  1. 14 CFR 399.111 - All operations of federally authorized carriers to be regulated by the Board.

    Science.gov (United States)

    2010-01-01

    ... SECRETARY, DEPARTMENT OF TRANSPORTATION (AVIATION PROCEEDINGS) POLICY STATEMENTS STATEMENTS OF GENERAL POLICY Policies Relating to Federal Preemption of State Economic Regulations § 399.111 All operations of... carriers are subject to the requirements of Title IV of the Act, including certification and tariff-filing...

  2. On providing the fault-tolerant operation of information systems based on open content management systems

    Science.gov (United States)

    Kratov, Sergey

    2018-01-01

    Modern information systems designed to service a wide range of users, regardless of their subject area, are increasingly based on Web technologies and are available to users via Internet. The article discusses the issues of providing the fault-tolerant operation of such information systems, based on free and open source content management systems. The toolkit available to administrators of similar systems is shown; the scenarios for using these tools are described. Options for organizing backups and restoring the operability of systems after failures are suggested. Application of the proposed methods and approaches allows providing continuous monitoring of the state of systems, timely response to the emergence of possible problems and their prompt solution.

  3. Incentive regulation regarding the service quality of electricity and natural gas network operators in 2015. Follow-up Report, January 2017

    International Nuclear Information System (INIS)

    2017-01-01

    The tariffs set by the French Energy Regulation Commission (CRE) for natural gas distribution system operators (DSOs), natural gas transmission system operators (TSOs) as well as for the electricity distribution system operator (Enedis, former ERDF) include an incentive regulation regarding the quality of service. The CRE has defined indicators to monitor the performance of operators in several fields considered relevant to assess the quality of service. Some of these indicators, considered to have specific importance in ensuring that the market operates properly, are subject to a system of financial incentives: bonuses or penalties are given to operators depending on the attainment of objectives set by the CRE. Other indicators, which do not carry financial incentives, complete the mechanism and ensure a broader surveillance of the operators' service quality. A financial incentive may be applied to these indicators at a later date if the CRE deems it necessary. The analyses of the service quality monitoring indicators presented in this report cover the period from January 1 to December 31, 2015. A review of the service quality of DSOs, TSOs and Enedis is made according to these indicators. An annex contains all individual quality reports of Enedis, DSOs and TSOs

  4. Fleet operator risks for using fleets for V2G regulation

    International Nuclear Information System (INIS)

    Hill, Davion M.; Agarwal, Arun S.; Ayello, Francois

    2012-01-01

    Future fleets of vehicles may include electric vehicles (EVs) or hybrid electric vehicles (HEVs) because of potential fuel savings. Recent demonstration of diesel parallel hybrids in a delivery fleet led to fuel economy improvements, and hybrid bus demonstrations exhibited twice the fuel economy of the conventional bus. Fleet ownership may include management of a fleet of vehicles as small as 10 units and as large as hundreds or thousands. In addition to fuel savings, the newer extended range electric vehicles (EREVs) and pure EVs permit vehicle to grid (V2G) opportunities. These V2G opportunities may present additional revenue for fleets by providing ancillary services to local grid independent system operators (ISOs), provided that the burden of driving and V2G services do not accelerate the degradation of the battery systems in these vehicles. The subject of this study is to determine the financial risks associated with accelerated battery degradation in a V2G-enabled EREV fleet expected to perform ancillary service duty while charging in addition to the normal loads of drive cycle duty. We determine that battery cycle life during V2G duty is a critical parameter, which can determine whether or not the business model is viable. - Highlights: ► V2G regulation cycle life of EREV batteries must be >50,000 cycles to be profitable. ► Present knowledge and test data about the impact of V2G cycles on battery life are limited. ► Replacement of batteries and energy throughput are major factors in the cost–benefit analysis. ► V2G fleet is not viable with present data but can be viable with some technical advancement.

  5. Nuclear reactors in de-regulated markets: Integration between providers and customers?

    International Nuclear Information System (INIS)

    Girard, Philippe

    2006-01-01

    The deregulation of electricity markets has in most cases coincided with the end of state monopolies, where financial risks were borne by customers/citizens. Today, despite an economic advantage, nuclear power development faces two main problems: public acceptance and reticence of investors (banks, utilities shareholders). The development of electricity markets provides different financial instruments in order to hedge financial risks, but it is currently difficult to fix forward contracts for more than three to four years, and this period is insufficient for the financing of a nuclear reactor. A solution could be the evolution of nuclear providers into nuclear operators selling electricity (MWh) rather than selling nuclear capacity (MW), nuclear fuel and services. In this case, their customers would be utilities and big customers aiming to hedge a part of their supplies with long-term contracts or stakes in nuclear reactors without some nuclear constraints. (author)

  6. Regulations and Procedures Manual

    Energy Technology Data Exchange (ETDEWEB)

    Young, Lydia [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2010-09-30

    The purpose of the Regulations and Procedures Manual (RPM) is to provide Laboratory personnel with a reference to University and Lawrence Berkeley National Laboratory policies and regulations by outlining the normal practices and answering most policy questions that arise in the day-to-day operations of Laboratory departments. Much of the information in this manual has been condensed from detail provided in Laboratory procedure manuals, Department of Energy (DOE) directives, and Contract DE-AC02-05CH11231. This manual is not intended, however, to replace any of those documents. The sections on personnel apply only to employees who are not represented by unions. Personnel policies pertaining to employees represented by unions may be found in their labor agreements. Questions concerning policy interpretation should be directed to the department responsible for the particular policy. A link to the Managers Responsible for RPM Sections is available on the RPM home page. If it is not clear which department should be called, please contact the Associate Laboratory Director of Operations.

  7. Operation set for 2018 as regulator considers olkiluoto-3 licence application

    Energy Technology Data Exchange (ETDEWEB)

    Kraev, Kamen [NucNet, Brussels (Belgium)

    2017-02-15

    Finland has announced progress with its delayed nuclear project and has confirmed it will not be affected by anomalies discovered in some components manufactured for EPRs in France. The Olkiluoto-3 European Pressurised Reactor (EPR) nuclear plant under construction in Finland is on schedule to begin commercial operation in 2018 with the country's regulator preparing a safety assessment that will pave the way for fuel loading. Jouni Silvennoinen, senior vice-president for Olkiluoto-3 at Teollisuuden Voima Oyj (TVO), told NucNet that fuel loading at the EPR plant, which is nine years behind schedule, is expected in the spring of 2018. He said construction and licensing of the plant are progressing.

  8. Exploring the sequence-function relationship in transcriptional regulation by the lac O1 operator.

    Science.gov (United States)

    Maity, Tuhin S; Jha, Ramesh K; Strauss, Charlie E M; Dunbar, John

    2012-07-01

    Understanding how binding of a transcription factor to an operator is influenced by the operator sequence is an ongoing quest. It facilitates discovery of alternative binding sites as well as tuning of transcriptional regulation. We investigated the behavior of the Escherichia coli Lac repressor (LacI) protein with a large set of lac O(1) operator variants. The 114 variants examined contained a mean of 2.9 (range 0-4) mutations at positions -4, -2, +2 and +4 in the minimally required 17 bp operator. The relative affinity of LacI for the operators was examined by quantifying expression of a GFP reporter gene and Rosetta structural modeling. The combinations of mutations in the operator sequence created a wide range of regulatory behaviors. We observed variations in the GFP fluorescent signal among the operator variants of more than an order of magnitude under both uninduced and induced conditions. We found that a single nucleotide change may result in changes of up to six- and 12-fold in uninduced and induced GFP signals, respectively. Among the four positions mutated, we found that nucleotide G at position -4 is strongly correlated with strong repression. By Rosetta modeling, we found a significant correlation between the calculated binding energy and the experimentally observed transcriptional repression strength for many operators. However, exceptions were also observed, underscoring the necessity for further improvement in biophysical models of protein-DNA interactions. © 2012 The Authors Journal compilation © 2012 FEBS.

  9. Coordination and decision making of regulation, operation, and market activities in power systems

    Science.gov (United States)

    Nakashima, Tomoaki

    Electric power has been traditionally supplied to customers at regulated rates by vertically integrated utilities (VIUs), which own generation, transmission, and distribution systems. However, the regulatory authorities of VIUs are promoting competition in their businesses to lower the price of electric energy. Consequently, in new deregulated circumstances, many suppliers and marketers compete in the generation market, and conflict of interest may often occur over transmission. Therefore, a neutral entity, called an independent system operator (ISO), which operates the power system independently, has been established to give market participants nondiscriminatory access to transmission sectors with a natural monopoly, and to facilitate competition in generation sectors. Several types of ISOs are established at present, with their respective regions and authorities. The ISO receives many requests from market participants to transfer power, and must evaluate the feasibility of their requests under the system's condition. In the near future, regulatory authorities may impose various objectives on the ISOs. Then, based on the regulators' policies, the ISO must determine the optimal schedules from feasible solutions, or change the market participants' requests. In a newly developed power market, market participants will conduct their transactions in order to maximize their profit. The most crucial information in conducting power transactions is price and demand. A direct transaction between suppliers and consumers may become attractive because of its stability of price, while in a power exchange market, gaming and speculation of participants may push up electricity prices considerably. To assist the consumers in making effective decisions, suitable methods for forecasting volatile market price are necessary. This research has been approached from three viewpoints: Firstly, from the system operator's point of view, desirable system operation and power market structure

  10. 78 FR 53107 - Drawbridge Operation Regulation; Passaic River, Kearny and Newark, NJ

    Science.gov (United States)

    2013-08-28

    ... reducing vehicular traffic congestion during the morning and afternoon vehicular rush hour periods due to... alleviate traffic congestion resulting from area roadway closures. It is expected that this change to the regulations would provide relief to vehicular traffic while continuing to meet the reasonable needs of...

  11. Expected Range of Cooperation Between Transmission System Operators and Distribution System Operators After Implementation of ENTSO-E Grid Codes

    Directory of Open Access Journals (Sweden)

    Tomasz Pakulski

    2015-06-01

    Full Text Available The authors present the prospects of cooperation between transmission system operators (TSO and distribution system operators (DSO after entry into force ENTSO-E (European Network of Transmission System Operators for Electricity grid codes. New areas of DSO activities, associated with offering TSO aggregated services for national power system regulation based on the regulation resources connected to the distribution grid, and services on the distribution system level as part of the creation of local balancing areas (LBA are presented. The paper also presents the possibilities of providing ancillary services by different types of distributed generation sources in the distribution network. The LBA concept, which involves integrated management of local regulation resources including generation, demand, and energy storage is described. The options of the renewable energy sources (RES using for voltage and reactive power control in the distribution network with the use of wind farms (WF connected to the distribution system are characterized.

  12. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Science.gov (United States)

    2010-04-01

    ... Company, Perry Nuclear Power Plant; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC... the Perry Nuclear Power Plant, Unit 1 (PNPP). The license provides, among other things, that the... date for all operating nuclear power plants, but noted that the Commission's regulations provide...

  13. 75 FR 38411 - Drawbridge Operation Regulations; Chelsea River, Chelsea and East Boston, MA, Event-Road Race

    Science.gov (United States)

    2010-07-02

    ... Operation Regulations; Chelsea River, Chelsea and East Boston, MA, Event--Road Race AGENCY: Coast Guard, DHS... is necessary to facilitate a public event, the Chelsea River Revel 5K Road Race. DATES: This... public event, the Chelsea River Revel 5K Road Race. This deviation allows the bridge to remain closed...

  14. The Characteristics of an Effective Nuclear Regulator

    International Nuclear Information System (INIS)

    Cheok, Michael; Wertelaers, An; Lojk, Robert; Santini, Miguel; Alm-Lytz, Kirsi; Rigail, Anne-Cecile; Weidenbruck, Kai-Jochen; Stoppa, Gisela; Rainieri, Roberto; Aoki, Masahiro; Gonzalez-Mercado; Miroshnichenko, Mikhail; Kuznetsov, Nikolay; Kudryavtsev, Evgeny; Cid, Rafael; Franzen, Anna; Skanberg, Lars; Gibson, Steve; Golshan, Mina; Cheok, Michael; Nicic, Adriana; Salgado, Nancy; Creswell, Len

    2014-01-01

    Both national and international organisations agree that the fundamental objective of all nuclear safety regulatory bodies - the regulator's prime purpose - is to ensure that nuclear licensees operate their facilities at all times in a safe manner. Much has been written about ways to improve regulatory processes or to improve the effectiveness of a regulatory body, including in previous OECD/NEA regulatory guidance booklets. But until now, none have focused on the characteristics of an effective nuclear safety regulator. Effective organisations are those that have good leadership and are able to transform strategic direction into operational programmes. Effectiveness is about how well the organisation is achieving its fundamental purpose - in the case of a nuclear safety regulator, ensuring that licensees operate their facilities and discharge their obligations in a safe manner. This regulatory guidance booklet describes the characteristics of an effective nuclear safety regulator in terms of roles and responsibilities, principles and attributes. Each of the characteristics discussed in this report is a necessary feature of an effective nuclear safety regulator but no one characteristic is sufficient on its own. It is the combination of these characteristics that leads to the effectiveness of a nuclear regulatory body. The report provides a unique resource to countries with existing, mature regulators and can be used for benchmarking as well as training and developing staff. It will also be useful for new entrant countries in the process of developing and maintaining an effective nuclear safety regulator. (authors)

  15. 77 FR 16928 - Drawbridge Operation Regulation; Miami River, Miami, FL

    Science.gov (United States)

    2012-03-23

    ...,'' and then click on the balloon shape in the ``Actions'' column. If you submit your comments [[Page... N.W. 12th Avenue Bridge provides a vertical clearance of 22 feet above mean high water in the closed position, and a horizontal clearance of 150 feet. The normal operating schedule for the bridge is set forth...

  16. 20 CFR 670.945 - Are Job Corps operators and service providers authorized to pay State or local taxes on gross...

    Science.gov (United States)

    2010-04-01

    ... provider to pay such taxes, the center operator or service provider may pay the taxes with Federal funds... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Are Job Corps operators and service providers authorized to pay State or local taxes on gross receipts? 670.945 Section 670.945 Employees' Benefits...

  17. Chloroplast Translation: Structural and Functional Organization, Operational Control, and Regulation[OPEN

    Science.gov (United States)

    2018-01-01

    Chloroplast translation is essential for cellular viability and plant development. Its positioning at the intersection of organellar RNA and protein metabolism makes it a unique point for the regulation of gene expression in response to internal and external cues. Recently obtained high-resolution structures of plastid ribosomes, the development of approaches allowing genome-wide analyses of chloroplast translation (i.e., ribosome profiling), and the discovery of RNA binding proteins involved in the control of translational activity have greatly increased our understanding of the chloroplast translation process and its regulation. In this review, we provide an overview of the current knowledge of the chloroplast translation machinery, its structure, organization, and function. In addition, we summarize the techniques that are currently available to study chloroplast translation and describe how translational activity is controlled and which cis-elements and trans-factors are involved. Finally, we discuss how translational control contributes to the regulation of chloroplast gene expression in response to developmental, environmental, and physiological cues. We also illustrate the commonalities and the differences between the chloroplast and bacterial translation machineries and the mechanisms of protein biosynthesis in these two prokaryotic systems. PMID:29610211

  18. The Evolving Contingency Contracting Market: Private Sector Self regulation and United States Government Monitoring of Procurement of Stability Operations Services

    Science.gov (United States)

    2016-01-01

    statements of work would be useful in ensuring ethical govern- ment procurement practices. Conclusions The United States conducts diplomatic, defense...THE EVOLVING CONTINGENCY CONTRACTING MARKET: PRIVATE SECTOR SELF-REGULATION AND UNITED STATES GOVERNMENT MONITORING OF PROCUREMENT OF STABILITY...MARKET: PRIVATE SECTOR SELF-REGULATION AND UNITED STATES GOVERNMENT MONITORING OF PROCUREMENT OF STABILITY OPERATIONS SERVICES Whitney Grespin January

  19. A framework to assess landscape structural capacity to provide regulating ecosystem services in West Africa.

    Science.gov (United States)

    Inkoom, Justice Nana; Frank, Susanne; Greve, Klaus; Fürst, Christine

    2018-03-01

    The Sudanian savanna landscapes of West Africa are amongst the world's most vulnerable areas to climate change impacts. Inappropriate land use and agriculture management practices continuously impede the capacity of agricultural landscapes to provide ecosystem services (ES). Given the absence of practical assessment techniques to evaluate the landscape's capacity to provide regulating ES in this region, the goal of this paper is to propose an integrative assessment framework which combines remote sensing, geographic information systems, expert weighting and landscape metrics-based assessment. We utilized Analytical Hierarchical Process and Likert scale for the expert weighting of landscape capacity. In total, 56 experts from several land use and landscape management related departments participated in the assessment. Further, we adapted the hemeroby concept to define areas of naturalness while landscape metrics including Patch Density, Shannon's Diversity, and Shape Index were utilized for structural assessment. Lastly, we tested the reliability of expert weighting using certainty measurement rated by experts themselves. Our study focused on four regulating ES including flood control, pest and disease control, climate control, and wind erosion control. Our assessment framework was tested on four selected sites in the Vea catchment area of Ghana. The outcome of our study revealed that highly heterogeneous landscapes have a higher capacity to provide pest and disease control, while less heterogeneous landscapes have a higher potential to provide climate control. Further, we could show that the potential capacities to provide ecosystem services are underestimated by 15% if landscape structural aspects assessed through landscape metrics are not considered. We conclude that the combination of adapted land use and an optimized land use pattern could contribute considerably to lower climate change impacts in West African agricultural landscapes. Copyright © 2017 Elsevier

  20. The Impacts of Regulations and Financial Development on the Operations of Supply Chains with Greenhouse Gas Emissions

    Science.gov (United States)

    Xiao, Zhuang; Tian, Yixiang; Yuan, Zheng

    2018-01-01

    To establish a micro foundation to understand the impacts of greenhouse gas (GHG) emission regulations and financial development levels on firms’ GHG emissions, we build a two-stage dynamic game model to incorporate GHG emission regulations (in terms of an emission tax) and financial development (represented by the corresponding financing cost) into a two-echelon supply chain. With the subgame perfect equilibrium, we identify the conditions to determine whether an emission regulatory policy and/or financial development can affect GHG emissions in the supply chain. We also reveal the impacts of the strictness of GHG emission regulation, the financial development level, and the unit GHG emission rate on the operations of the supply chain and the corresponding profitability implications. Managerial insights are also discussed. PMID:29470451

  1. 75 FR 16009 - Drawbridge Operation Regulations; Acushnet River, New Bedford and Fairhaven, MA, Event-Road Race

    Science.gov (United States)

    2010-03-31

    ... Operation Regulations; Acushnet River, New Bedford and Fairhaven, MA, Event--Road Race AGENCY: Coast Guard... Community Health Center 5K Road Race, by allowing the bridge to remain in the closed position for two hours during the running of the 5K Road Race. DATES: This deviation is effective from 10 a.m. through 12 p.m...

  2. Experience with the 1985 UK ionizing radiation regulations: the regulators' viewpoint

    International Nuclear Information System (INIS)

    Bines, W.P.; Beaver, P.F.

    1991-01-01

    The Ionising Radiations Regulations 1985 achieved UK implementation of the Euratom Basic Safety Standards Directive; interim action has taken account of recent revisions of risk estimates and the regulations will not be revised in advance of renegotiation of the Euratom Directive. Wide ranging consultation, central to the development of health and safety legislation in the UK, leads to greater co-operation between regulators and regulated and more acceptable legislation. Examples of co-operation, also of methods of enforcement and the use made of them, are given. The authors conclude that the regulations have stood the test of experience well. (Author)

  3. Estimating the costs of AECB regulation

    International Nuclear Information System (INIS)

    1981-04-01

    A comprehensive analysis of the costs to the Canadian nuclear industry of the present Atomic Energy Control Board regulatory activities was carried out to provide a framework for a socio-economic impact analysis of AECB regulations. Regulaory costs in uranium mining and milling, fuel fabrication, power generation, the nuclear fuel cycle as a whole, and radioisotope use are studied. The cost of safety measures which industry would still undertake in the absence of government regulations ('prudent operator' costs) are not included. (L.L.)

  4. Answers to questions at public meetings regarding implementation of Title 10, Code of Federal Regulations, Part 55 on operators' licenses

    International Nuclear Information System (INIS)

    1987-11-01

    This document presents questions and answers based on the transcripts of four public meetings (and from written questions submitted after the meetings) conducted from April 9 to April 20, 1987 by the staff of the US Nuclear Regulatory Commission. The meetings discussed implementation of the Commission's final rule governing Operators' Licenses and Conforming Amendments (10 CFR Parts 55 and 50). The rule became effective May 26, 1987 and is intended to clarify the regulations for issuing licenses to operators and senior operators; revise the requirements and scope of written examinations and operating tests for operators and senior operators, require a simulation facility; clarify procedures for administering requalification examinations; and describe the form and content for operator license applications

  5. 78 FR 53104 - Drawbridge Operation Regulation; Hackensack River, Kearny and Jersey City, NJ

    Science.gov (United States)

    2013-08-28

    ... relief from vehicular traffic congestion during the morning and afternoon vehicular rush hour periods due... periods to alleviate traffic congestion resulting from area roadway closures. It is expected that this change to the regulations would provide relief to vehicular traffic while continuing to meet the...

  6. Co-operative approaches to regulation

    National Research Council Canada - National Science Library

    Huigen, Hans; Organisation for Economic Co-operation and Development

    1997-01-01

    The case studies in this occasional paper are about ways in which governments and businesses are seeking to address economic and social problems by using new forms of co-operation that are different...

  7. Liability of German suppliers and service providers for foreign projects

    International Nuclear Information System (INIS)

    Raetzke, Christian

    2017-01-01

    Main topic is the question of the extent to which German plant constructors, suppliers, engineering consultants, experts or operators expose themselves to liability for the delivery of their products and services abroad. In principle, in almost all nuclear power countries, liability is channelled to the operator; suppliers and service providers are exempted from liability. However, there are conceivable cases in which this principle does not apply. This can occur, for example, if a major accident is assumed to have an impact on neighbouring countries of the country of destination; here, depending on the applicable law, the German supplier or service provider could be ordered to pay for damages. The risk of liability remaining in this way can be reduced if necessary by means of an exemption clause in the supply contract. The regulation of the operator's recourse to the contractor, insofar as the latter is responsible for the accident, and the - controversial -question of to what extent damage to the plant itself gives rise to claims for damages by the operator against the contractor are also discussed.

  8. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  9. Improved nuclear power plant operations through performance-based safety regulation

    International Nuclear Information System (INIS)

    Golay, M.W.

    1998-01-01

    The US Nuclear Regulatory Commission (NRC) has recently instituted use of Risk-Informed, Performance-Based Regulation (RIPBR) for protecting public safety in the use of nuclear power. This was done most importantly during June 1997 in issuance of revised Regulatory Guides and Standard Review Plan (SRP) guidance to licensees and the NRC staff. The propose of RIPBR is to replace the previously-used system of prescriptive regulation, which focuses upon what licensees must do, to a system which focuses upon what they must achieve. RIPBR is goals-oriented and the previous system is means-oriented. This regulatory change is potentially revolutionary, and offers many opportunities for improving the efficiency of improving both nuclear power operations and safety. However, it must be nurtured carefully if is to be successful. The work reported in this paper is concerned with showing how RIPBR can be implemented successfully, with benefits in both areas being attained. It is also concerned with how several of the practical barriers to establishing a workable new regulatory system can be overcome. This work, sponsored by the US Dept. of Energy, is being performed in collaboration with Northeast Utilities Services Crop. and the Idaho National Engineering Laboratory. In our work we have examined a practical safety-related example at the Millstone 3 nuclear power station for implementation of RIPBR. In this examination we have formulated a set of modifications to the plant's technical specifications, and are in the process of investigating their bases and refining the modifications. (author)

  10. 40 CFR 122.32 - As an operator of a small MS4, am I regulated under the NPDES storm water program?

    Science.gov (United States)

    2010-07-01

    ... regulated under the NPDES storm water program? 122.32 Section 122.32 Protection of Environment ENVIRONMENTAL... operator of a small MS4, am I regulated under the NPDES storm water program? (a) Unless you qualify for a... a petition to the NPDES permitting authority to require an NPDES permit for your discharge of storm...

  11. ETSON proposal on the European operational experience feedback system

    International Nuclear Information System (INIS)

    Maqua, Michael; Bertrand, Remy; Gelder, Pieter de

    2007-01-01

    The new IAEA Safety Fundamentals states regarding the operating experience feedback: The feedback of operating experience from facilities and activities - and, where relevant, from elsewhere - is a key means of enhancing safety. Processes must be put in place for the feedback and analysis of operating experience, including initiating events, accident precursors, near misses, accidents and unauthorized acts, so that lessons may be learned, shared and acted upon. This presentation deals with the proposal of the ETSON (European TSO Network) to optimize the European operating experiences feedback (OEF). It is generally recognized that the efficiency of nuclear safety supervision by public authorities is based on two key requirements: - the existence of a competent authority at national level, benefiting from an appropriate legislative and regulatory basis, from adequate (quantitatively and qualitatively) human resources, particularly for inspection purposes, - the availability of resources devoted to highly specialised independent technical expertise, in order to provide competent authorities with pertinent technical opinions on: -- the safety files provided by operators, for the purpose of licensing corresponding activities, -- the exploitation for regulatory purposes of the operating experience feed back from licensed nuclear installations. There are two worldwide systems intended to learn lessons from experience: the WANO (World Association of Nuclear Operators) system established by the licensees with access restricted to operating organizations and the IRS system jointly operated by IAEA and OECD/NEA accessible to regulators and to some other users nominated by the regulators in their countries. The IRS itself is dedicated to the analysis of safety significant operating events. NEA/CNRA runs a permanent working group on operating experience (WGOE). WGOE provides among other things also generic reports on safety concerns related to operating experiences and

  12. 78 FR 72152 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-02

    ... experience available. Current Actions: There is no change to this existing regulation. Type of Review... costs and costs of operation, maintenance, and purchase of services to provide information. Approved...

  13. 20 CFR 670.510 - Are Job Corps center operators responsible for providing all vocational training?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Are Job Corps center operators responsible for providing all vocational training? 670.510 Section 670.510 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR THE JOB CORPS UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT...

  14. DC microgrids providing frequency regulation in electrical power system - imperfect communication issues

    DEFF Research Database (Denmark)

    Bašić, Hrvoje; Dragicevic, Tomislav; Pandžić, Hrvoje

    2017-01-01

    This paper presents a model of multiple DC microgrids with battery energy storage systems and demand response capability, taking part in primary frequency regulation of electrical power system. Although DC microgrids can contribute to stability and efficiency of frequency regulation, these complex...... systems may cause serious stability issues due to the imperfect communication. This work presents possible scenarios of unstable primary frequency regulation in a simplified model of electrical power system with DC microgrids, which are controlled through communication network....

  15. SOR/83-77, Physical Security Regulations

    International Nuclear Information System (INIS)

    1983-01-01

    These Regulations establish and require the maintenance of security systems, equipment and procedures to implement Canada's international obligations regarding security at those nuclear facilities. The Regulations, which determine the different areas in a nuclear facility, provide for the establishment of security barriers around the ''protected areas'' occupied by facilities and prescribe that the licensees (operators) are required to keep the facilities for which they hold a licence under constant surveillance. They must also make arrangements for a response force - a local, provincial or federal police force detachment or similar force - to provide assistance where necessary. No person may enter a protected area without written authorization from the licensee concerned. Inspectors appointed under the Atomic Energy Control Regulations or designated under an agreement between Canada and the IAEA may be granted an authorization to enter such areas to discharge their duties. The Regulations have been amended by SOR/84-81 of 12 January 1988 to add certain requirements concerning documentary evidence and the duties of the board; by SOR/85-1016 of 25 October 1985 to revise the definition of response force and provide other clarifications; by SOR/91-585 of 10 October 1991 to clarify wording in French. (NEA)

  16. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  17. NRC test results and operations experience provide insights for a new gate valve stem force correlation

    International Nuclear Information System (INIS)

    Watkins, John C.; Steele, Robert Jr.; DeWall, Kevin G.; Weidenhamer, G.H.; Rothberg, O.O.

    1994-01-01

    This paper presents the results of testing sponsored by the NRC to assess valve and motor operator performance under varying pressure and fluid conditions. This effort included an examination of the methods used by the industry to predict the required stem force of a valve, and research to provide guidelines for the extrapolation of in situ test results to design basis conditions.Years ago, when most of these valves were originally installed, the industry used a set of equations to determine analytically that the valves' motor-operators were large enough and the control switches were set high enough to close the valves at their design basis conditions. Our research has identified several inconsistencies with the industry's existing gate valve stem force equation and has challenged the overly simplistic assumptions inherent in its use. This paper discusses the development of the INEL correlation, which serves as the basis for a method to bound the stem force necessary to close flexwedge gate valves whose operational characteristics have been shown to be predictable. As utilities undertake to provide assurance of their valves' operability, this ability to predict analytically the required stem force is especially important for valves that cannot be tested at design basis conditions. For such valves, the results of tests conducted at less severe conditions can be used with the INEL correlation to make the necessary prediction. ((orig.))

  18. 7 CFR 1466.11 - Technical services provided by qualified personnel not affiliated with USDA.

    Science.gov (United States)

    2010-01-01

    ... not affiliated with USDA. 1466.11 Section 1466.11 Agriculture Regulations of the Department of... OPERATIONS ENVIRONMENTAL QUALITY INCENTIVES PROGRAM Contracts and Payments § 1466.11 Technical services provided by qualified personnel not affiliated with USDA. (a) NRCS may use the services of qualified TSPs...

  19. State of bus safety in the U.S. : summary of federal and state regulations.

    Science.gov (United States)

    2014-06-01

    This report provides a comprehensive overview of transit bus safety regulations and standards developed by all 50 states, as well as : information on how state departments of transportation (DOT) regulate the maintenance or operation of transit/parat...

  20. Co-operative development of nuclear safety regulations, guides and standards based on NUSS

    International Nuclear Information System (INIS)

    Pachner, J.; Boyd, F.C.; Yaremy, E.M.

    1985-01-01

    A major need of developing Member States building nuclear power plants (NPPs) of foreign origin is to acquire a capability to regulate such nuclear plants independently. Among other things, this requires the development of national nuclear safety regulations, guides and standards to govern the development and use of nuclear technology. Recognizing the importance and complexity of this task, it seems appropriate that the NPP-exporting Member States share their experience and assist the NPP-importing Member States in the development of their national regulations and guides. In 1983, the Atomic Energy Control Board and Atomic Energy of Canada Ltd. conducted a study of a possible joint programme involving Canada, an NPP-importing Member State and the IAEA for the development of the national nuclear safety regulations and guides based on NUSS documents. During the study, a work plan with manpower estimates for the development of design regulations, safety guides and a guide for regulatory evaluation of design was prepared as an investigatory exercise. The work plan suggests that a successful NUSS implementation in developing Member States will require availability of significant resources at the start of the programme. The study showed that such a joint programme could provide an effective mechanism for transfer of nuclear safety know-how to the developing Member States through NUSS implementation. (author)

  1. 78 FR 64526 - Information Collection Activities: Sulphur Operations; Submitted for Office of Management and...

    Science.gov (United States)

    2013-10-29

    ...: Sulphur Operations; Submitted for Office of Management and Budget (OMB) Review; Comment Request ACTION: 30... paperwork requirements in the regulations under Subpart P, Sulphur Operations. This notice also provides the..., Currently Under Review). SUPPLEMENTARY INFORMATION: Title: 30 CFR 250, Subpart P, Sulphur Operations. OMB...

  2. Hanford Environmental Information System (HEIS) Operator`s Manual. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Schreck, R.I.

    1991-10-01

    The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. This manual describes the facilities available to the operational user who is responsible for data entry, processing, scheduling, reporting, and quality assurance. A companion manual, the HEIS User`s Manual, describes the facilities available-to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines.

  3. The Financial Regulations of the Agency. Amendment of Regulation 7.03

    International Nuclear Information System (INIS)

    1972-01-01

    On 8 December 1971 the Board of Governors amended the second sentence of Financial Regulation 7. 03, and the Regulation now reads as follows: There shall be established a Working Capital Fund in an amount and for purposes to be determined from time to time by the Board of Governors, with the approval of the General Conference. The source of moneys of the Working Capital Fund shall be advances from Member States, and these advances shall be in accordance with their respective base rates of assessment provided for in sub-paragraph (b) of the operative paragraph of Resolution GC(XV)/RES/283 adopted by the General Conference in 1971. Each advance shall be carried to the credit of the Member State which has made such advance

  4. System certification progress in concept recognition in IAEA regulation

    International Nuclear Information System (INIS)

    Luna, R.E.; Pollog, T.

    1995-01-01

    System Certification is a regulatory concept which is intended to expand the scope of radioactive material transport regulations by allowing alternative means for proving compliance with the requisite standards of safety set out in transport regulations. In practice it may allow more stringent requirements in one aspect of the regulations to be substituted for less stringent application in other areas so long as the safety standard provided by regulation is preserved. The concept is widely perceived as the imposition of operational controls in exchange for relaxation of packaging standards, but that is only one possibility in the spectrum of potential actions under a System Certification provision in IAEA or national regulations

  5. Enhancing Global Competitiveness: Benchmarking Airline Operational Performance in Highly Regulated Environments

    Science.gov (United States)

    Bowen, Brent D.; Headley, Dean E.; Kane, Karisa D.

    1998-01-01

    Enhancing competitiveness in the global airline industry is at the forefront of attention with airlines, government, and the flying public. The seemingly unchecked growth of major airline alliances is heralded as an enhancement to global competition. However, like many mega-conglomerates, mega-airlines will face complications driven by size regardless of the many recitations of enhanced efficiency. Outlined herein is a conceptual model to serve as a decision tool for policy-makers, managers, and consumers of airline services. This model is developed using public data for the United States (U.S.) major airline industry available from the U/S. Department of Transportation, Federal Aviation Administration, the National Aeronautics and Space Administration, the National Transportation Safety Board, and other public and private sector sources. Data points include number of accidents, pilot deviations, operational performance indicators, flight problems, and other factors. Data from these sources provide opportunity to develop a model based on a complex dot product equation of two vectors. A row vector is weighted for importance by a key informant panel of government, industry, and consumer experts, while a column vector is established with the factor value. The resulting equation, known as the national Airline Quality Rating (AQR), where Q is quality, C is weight, and V is the value of the variables, is stated Q=C[i1-19] x V[i1-19]. Looking at historical patterns of AQR results provides the basis for establishment of an industry benchmark for the purpose of enhancing airline operational performance. A 7 year average of overall operational performance provides the resulting benchmark indicator. Applications from this example can be applied to the many competitive environments of the global industry and assist policy-makers faced with rapidly changing regulatory challenges.

  6. Federal Aviation Regulations - National Aviation Regulations of Russia

    Science.gov (United States)

    Chernykh, O.; Bakiiev, M.

    2018-03-01

    Chinese Aerospace Engineering is currently developing cooperation with Russia on a wide-body airplane project that has directed the work towards better understanding of Russian airworthiness management system. The paper introduces national Aviation regulations of Russia, presents a comparison of them with worldwide recognized regulations, and highlights typical differences. They have been found to be: two general types of regulations used in Russia (Aviation Regulations and Federal Aviation Regulations), non-unified structure of regulations on Aircraft Operation management, various separate agencies responsible for regulation issuance instead of one national aviation authority, typical confusions in references. The paper also gives a list of effective Russian Regulations of both types.

  7. Design of the ITER magnets to provide plasma operational flexibility

    International Nuclear Information System (INIS)

    Mitchell, N.; Bessette, D.; Ferrari, M.; Huguet, M.; Jong, C.; Takahashi, Y.; Yoshida, K.; Maix, R.; Krivchenkov, Y.; Zapretilina, E.

    2005-01-01

    The ITER magnets have been optimised and refined since the ITER Final Design Report (FDR) in 2001. Multiple design options have been eliminated and there is improved ability to drive a wide range of plasma configurations. Design iterations on the TF out of plane supports have eliminated stress concentrations in the inner keyways and have led to the choice of a so called friction-joint on the outside. The closure procedure for the TF case has been changed, with a new case segmentation, less risk of winding pack damage from shrinkage and better filling of the case-winding gaps. Selection of compact joints for the CS has enabled the peak field and cyclic stress levels in the conductor to be reduced while maintaining the flux capability. The uncertainty in the nuclear heat levels in the inner legs of the TF coils, and the need to operate with plasma nuclear powers from 360 to 700MW, lead to a thermal screen on the inside of the case with variable cooling capability. The electrical insulation specification has been refined after irradiation test results to give a better margin on the onset of degradation after operation to 3MWa/m 2 . The RWM stabilisation provided by the side CC has been extended by accepting higher voltages and heating from AC losses. R and D results from the model coil tests have shown lower than expected design margins for the Nb3Sn conductors. This has been offset by adopting the latest advances in strand performance, and the margins of the new conductor will be confirmed by testing in 2005. Preparation for procurement is underway with considerations on technically acceptable ways of splitting the magnet supply. (author)

  8. A Flexible Binding Site Architecture Provides New Insights into CcpA Global Regulation in Gram-Positive Bacteria.

    Science.gov (United States)

    Yang, Yunpeng; Zhang, Lu; Huang, He; Yang, Chen; Yang, Sheng; Gu, Yang; Jiang, Weihong

    2017-01-24

    Catabolite control protein A (CcpA) is the master regulator in Gram-positive bacteria that mediates carbon catabolite repression (CCR) and carbon catabolite activation (CCA), two fundamental regulatory mechanisms that enable competitive advantages in carbon catabolism. It is generally regarded that CcpA exerts its regulatory role by binding to a typical 14- to 16-nucleotide (nt) consensus site that is called a catabolite response element (cre) within the target regions. However, here we report a previously unknown noncanonical flexible architecture of the CcpA-binding site in solventogenic clostridia, providing new mechanistic insights into catabolite regulation. This novel CcpA-binding site, named cre var , has a unique architecture that consists of two inverted repeats and an intervening spacer, all of which are variable in nucleotide composition and length, except for a 6-bp core palindromic sequence (TGTAAA/TTTACA). It was found that the length of the intervening spacer of cre var can affect CcpA binding affinity, and moreover, the core palindromic sequence of cre var is the key structure for regulation. Such a variable architecture of cre var shows potential importance for CcpA's diverse and fine regulation. A total of 103 potential cre var sites were discovered in solventogenic Clostridium acetobutylicum, of which 42 sites were picked out for electrophoretic mobility shift assays (EMSAs), and 30 sites were confirmed to be bound by CcpA. These 30 cre var sites are associated with 27 genes involved in many important pathways. Also of significance, the cre var sites are found to be widespread and function in a great number of taxonomically different Gram-positive bacteria, including pathogens, suggesting their global role in Gram-positive bacteria. In Gram-positive bacteria, the global regulator CcpA controls a large number of important physiological and metabolic processes. Although a typical consensus CcpA-binding site, cre, has been identified, it remains

  9. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  10. Repository operational criteria analysis

    International Nuclear Information System (INIS)

    Hageman, J.P.; Chowdhury, A.H.

    1992-08-01

    The objective of the ''Repository Operational Criteria (ROC) Feasibility Studies'' (or ROC task) was to conduct comprehensive and integrated analyses of repository design, construction, and operations criteria in 10 CFR Part 60 regulations, considering the interfaces and impacts of any potential changes to those regulations. The study addresses regulatory criteria related to the preclosure aspects of the geologic repository. The study task developed regulatory concepts or potential repository operational criteria (PROC) based on analysis of a repository's safety functions and other regulations for similar facilities. These regulatory concepts or PROC were used as a basis to assess the sufficiency and adequacy of the current criteria in 10 CFR Part 60. Where the regulatory concepts were same as current operational criteria, these criteria were referenced. The operations criteria referenced or the PROC developed are given in this report. Detailed analyses used to develop the regulatory concepts and any necessary PROC for those regulations that may require a minor change are also presented. The results of the ROC task showed a need for further analysis and possible major rule change related to the design bases of a geologic repository operations area, siting, and radiological emergency planning

  11. Commercial Building Loads Providing Ancillary Services in PJM

    Energy Technology Data Exchange (ETDEWEB)

    MacDonald, Jason; Kiliccote, Sila; Boch, Jim; Chen, Jonathan; Nawy, Robert

    2014-06-27

    The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

  12. 75 FR 42832 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2010-07-22

    ... estate or gift tax return. Current Actions: There is no change to this existing regulation. Type of... capital or start-up costs and costs of operation, maintenance, and purchase of services to provide...

  13. Economic regulation of TSOs in the Nordic countries

    Energy Technology Data Exchange (ETDEWEB)

    Syvertsen, S. C.; Steinnes, S. H. [Norwegian Water Resources and Energy Directorate, Oslo (Norway); Robles, H. B.; Ek, G. [Energy Markets Inspectorate, Eskilstuna (Sweden); Ilonen, M; Nurmi, S. [Energy Market Authority, Helsinki (Finland); Thomsen, H. [Sekretariatet for Energitilsynet, Valby (Denmark)

    2012-12-15

    The main topic of this report is the economic regulation of the transmission system operators (To) in the Nordic countries (Denmark, Finland, Norway and Sweden). The purpose of this report is to give an overview of the design of the economic regulation and compare the main elements of the regulation between the countries. There is one To in each country. For all countries, the revenues of the Tos are regulated by yearly decisions. In Finland, Norway and Sweden the regulators set an annual revenue cap. In Denmark, the To sets the tariffs according to budget, while the regulator approves the annual report and thereby also approves the tariffs ex post. The economic regulation of TSOs includes both regulation of system operations and the regulation of network operations. Chapter 3 describes in brief the main responsibilities of the system operator in each country and how the costs related to these tasks are regulated. Norway regulates the system operation costs, where 60 percent of the costs are based on a cost-norm which is evaluated periodically. In Finland and Sweden these costs are considered as non-controllable and are passed through directly in the revenue cap. In Denmark only costs considered as necessary at efficient operation shall be included in the tariffs, and the regulators have the opportunity to exclude costs based on this. There are no benchmark or efficiency requirements in the Danish regulation. In chapter 4 the main elements of the economic regulation of network operations are described and compared in tables. All countries regulate the network operations of the TSO. In Denmark there are no explicit efficiency requirements, and the regulation is based on a non-profit principle. The TSO only gets a return based on a price adjustment on its capital base as of 2005. In Finland, Norway and Sweden the regulation include efficiency requirements or benchmarking of costs. In Norway this regards 60 percent of total costs related to the network operations

  14. Understanding to requirements for educational level in qualification of reactor operators

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhou Limin

    2007-01-01

    Requirements for qualification of reactor operators in nuclear safety regulations were discussed in this paper. The new issue was described in the confirmation of education level of reactor operators. The understanding to the requirements for Educational Level in Qualification of Reactor Operators was provided according to Higher Education Law of the People's Republic of China. It was proposed to improve the confirmation of qualification of reactor operators as soon as possible. (authors)

  15. Code on the safety of nuclear research reactors: Operation

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this publication is to provide the essential requirements and recommendations for the safe operation of research reactors, with emphasis on the supervisory and managerial aspects. However, the publication also provides some guidance and information on topics concerning all the organizations involved in operation. These objectives are expressed in terms of requirements and recommendations for the safe operation of research reactors. Emphasis is placed on the safety requirements that shall be met rather than on the ways in which they can be met. The requirements and recommendations may form the foundation necessary for a Member State to develop regulations and safety criteria for its research reactor programme.

  16. 77 FR 52599 - Drawbridge Operation Regulation; Elizabeth River, Eastern Branch, Norfolk, VA

    Science.gov (United States)

    2012-08-30

    ...; we anticipate less vehicular traffic congestion between 9 a.m. and 3 p.m., while causing fewer... expressed concerns about unscheduled openings that caused vehicular traffic congestion. The unscheduled... operating procedures appear to have reduced vehicular traffic congestion while still providing for the...

  17. Regulations under the Radiation Protection and Control Act, 1982, No. 27 of 1984

    International Nuclear Information System (INIS)

    1984-01-01

    These regulations provide for the control and administration of transporting, packaging and storing radioactive materials in South Australia. Such operations must be carried out in accordance with the Code of Practice for the Safe Transport of Radioactive Substances, the present Regulations and the IAEA Regulations for the Safe Transport of Radioactive Materials (1973 Edition), slightly amended for purposes of national application. (NEA) [fr

  18. Regulations and instructions; Propisi i uputstva

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-07-01

    Regulations and instructions for operating the RA reactor consist of the following chapters: general regulations with the fundamental RA reactor characteristics, operating regulations and instructions for the personnel on duty, regulations for accidental conditions, training program for the staff of the Laboratory for reactor operation. Propisi i uputstva za rad reaktora RA sadrze sledeca poglavlja: opsti deo sa kratkim opisom karakteristika reaktora RA, propisi za rad dezurnog osoblja, propisi za slucaj udesa, program obuke osoblja Laboratorije za eksploataciju reaktora RA.

  19. Operating principle of Soft Open Points for electrical distribution network operation

    International Nuclear Information System (INIS)

    Cao, Wanyu; Wu, Jianzhong; Jenkins, Nick; Wang, Chengshan; Green, Timothy

    2016-01-01

    Highlights: • Two control modes were developed for a B2B VSCs based SOP. • The SOP operating principle was investigated under various network conditions. • The performance of the SOP using two control modes was analyzed. - Abstract: Soft Open Points (SOPs) are power electronic devices installed in place of normally-open points in electrical power distribution networks. They are able to provide active power flow control, reactive power compensation and voltage regulation under normal network operating conditions, as well as fast fault isolation and supply restoration under abnormal conditions. Two control modes were developed for the operation of an SOP, using back-to-back voltage-source converters (VSCs). A power flow control mode with current control provides independent control of real and reactive power. A supply restoration mode with a voltage controller enables power supply to isolated loads due to network faults. The operating principle of the back-to-back VSCs based SOP was investigated under both normal and abnormal network operating conditions. Studies on a two-feeder medium-voltage distribution network showed the performance of the SOP under different network-operating conditions: normal, during a fault and post-fault supply restoration. During the change of network operating conditions, a mode switch method based on the phase locked loop controller was used to achieve the transitions between the two control modes. Hard transitions by a direct mode switching were noticed unfavourable, but seamless transitions were obtained by deploying a soft cold load pickup and voltage synchronization process.

  20. Protecting the public or setting the bar too high? Understanding the causes and consequences of regulatory actions of front-line regulators and specialized drug shop operators in Kenya.

    Science.gov (United States)

    Wafula, Francis; Molyneux, Catherine; Mackintosh, Maureen; Goodman, Catherine

    2013-11-01

    The problem of poor regulatory compliance has been widely reported across private health providers in developing countries. Less known are the underlying reasons for poor compliance, especially with regards to the roles played by front-line regulatory staff, and the regulatory institution as a whole. We designed a qualitative study to address this gap, with the study questions and tools drawing on a conceptual framework informed by theoretical literature on regulation. Data were collected from specialized drug shops (SDSs) in two rural districts in Western Kenya in 2011 through eight focus group discussions, and from regulatory staff from organizations governing the pharmaceutical sector through a total of 24 in-depth interviews. We found that relationships between front-line regulators and SDS operators were a strong influence on regulatory behaviour, often resulting in non-compliance and perverse outcomes such as corruption. It emerged that separate regulatory streams operated in urban and rural locations, based mainly on differing relationships between the front-line regulators and SDS operators, and on broader factors such as the competition environment and community expectations. Effective incentive structures for regulatory staff were either absent, or poorly linked to performance in regulatory organizations, resulting in divergences between the purposes of the regulatory organization and activities of front-line staff. Given the rural-urban differences in the practice environment, the introduction of lower retail practice requirements for rural SDSs could be considered. This would allow illegally operated shops to be brought within the regulatory framework, facilitating good quality provision of essential commodities to marginalized areas, without lowering the practice requirements for the better complying urban SDSs. In addition, regulatory organizations need to devise incentives that better link the level of effort to rewards such as professional

  1. 29 CFR 780.506 - Dependence of exemption on shade-grown tobacco operations.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Dependence of exemption on shade-grown tobacco operations. 780.506 Section 780.506 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION....506 Dependence of exemption on shade-grown tobacco operations. The exemption provided by section 13(a...

  2. 45 CFR 287.125 - What supportive and job retention services may be provided under the NEW Program?

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false What supportive and job retention services may be provided under the NEW Program? 287.125 Section 287.125 Public Welfare Regulations Relating to Public... Operations § 287.125 What supportive and job retention services may be provided under the NEW Program? The...

  3. The use of economic criteria in providing a basis for safe reactor operation

    International Nuclear Information System (INIS)

    Graham, J.

    1989-01-01

    Probabilistic criteria based upon an acceptance measure of protection for owner investment can complete the range of design probabilistic criteria between those set by acceptance public safety and those set by acceptable reliability in plant operation. Criteria which address the protection of owner investment have the benefit of lowering risk in adjacent risk regions by providing greater reliability in operation as well as less risk to the safety of the public and the environment. Such investment protection criteria are currently being used to extend plant life but they could also be used very beneficially as part of the initial design process. In this paper trial criteria are suggested which address the risk of extended plant shutdown with the resultant necessity to purchase replacement power, and the risk of replacement of expensive plant components. Additional financial assessment is required to ensure that there is a proper correlation between acceptable measures of owner-investment protection and the levels of probabilistic defence suggested, but the trial criteria proposed can be used as important practical design criteria

  4. Business Ethics of Tour Operators – The Case Study of TUI

    OpenAIRE

    Marija Šuleić; Aleksandra Dragin; Vanja Dragićević

    2014-01-01

    A large number of participants in tourism, both in offer and in demand, has conditioned the need for the creation ethical codices based on legislative regulations and moral principles. Among central figures in tourism, there are travel agencies and tour operators, the intermediaries between service providers and service users, in other words, passengers. The tour operators who are engaged in initiating tourism provide the services on foreign markets and tend to adapt their business to the law...

  5. Medical Oversight, Educational Core Content, and Proposed Scopes of Practice of Wilderness EMS Providers: A Joint Project Developed by Wilderness EMS Educators, Medical Directors, and Regulators Using a Delphi Approach.

    Science.gov (United States)

    Millin, Michael G; Johnson, David E; Schimelpfenig, Tod; Conover, Keith; Sholl, Matthew; Busko, Jonnathan; Alter, Rachael; Smith, Will; Symonds, Jennifer; Taillac, Peter; Hawkins, Seth C

    2017-01-01

    A disparity exists between the skills needed to manage patients in wilderness EMS environments and the scopes of practice that are traditionally approved by state EMS regulators. In response, the National Association of EMS Physicians Wilderness EMS Committee led a project to define the educational core content supporting scopes of practice of wilderness EMS providers and the conditions when wilderness EMS providers should be required to have medical oversight. Using a Delphi process, a group of experts in wilderness EMS, representing educators, medical directors, and regulators, developed model educational core content. This core content is a foundation for wilderness EMS provider scopes of practice and builds on both the National EMS Education Standards and the National EMS Scope of Practice Model. These experts also identified the conditions when oversight is needed for wilderness EMS providers. By consensus, this group of experts identified the educational core content for four unique levels of wilderness EMS providers: Wilderness Emergency Medical Responder (WEMR), Wilderness Emergency Medical Technician (WEMT), Wilderness Advanced Emergency Medical Technician (WAEMT), and Wilderness Paramedic (WParamedic). These levels include specialized skills and techniques pertinent to the operational environment. The skills and techniques increase in complexity with more advanced certification levels, and address the unique circumstances of providing care to patients in the wilderness environment. Furthermore, this group identified that providers having a defined duty to act should be functioning with medical oversight. This group of experts defined the educational core content supporting the specific scopes of practice that each certification level of wilderness EMS provider should have when providing patient care in the wilderness setting. Wilderness EMS providers are, indeed, providing health care and should thus function within defined scopes of practice and with

  6. 43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.

    Science.gov (United States)

    2010-10-01

    ... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Recovery of operation and maintenance (O&M) costs. 426.23 Section 426.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF...

  7. Operational and environmental safety

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The responsibility of the DOE Office of Operational and Environmental Safety is to assure that DOE-controlled activities are conducted in a manner that will minimize risks to the public and employees and will provide protection for property and the environment. The program supports the various energy technologies by identifying and resolving safety problems; developing and issuing safety policies, standards, and criteria; assuring compliance with DOE, Federal, and state safety regulations; and establishing procedures for reporting and investigating accidents in DOE operations. Guidelines for the radiation protection of personnel; radiation monitoring at nuclear facilities; an assessment of criticality accidents by fault tree analysis; and the preparation of environmental, safety, and health standards applicable to geothermal energy development are discussed

  8. Report on the incentive regulation regarding the service quality of natural gas network operators and ERDF. Summary report 2011

    International Nuclear Information System (INIS)

    2012-05-01

    The tariffs set by the French Energy Regulation Commission (CRE) for natural gas distribution system operators (DSOs), natural gas transmission system operators (TSOs) as well as for the electricity distribution system operator electricite Reseau Distribution France (ERDF) include an incentive regulation regarding the quality of service. The CRE has defined indicators to monitor the performance of operators in several fields considered relevant to assess the quality of service. Some of these indicators, considered to have specific importance in ensuring that the market operates properly, are subject to a system of financial incentives: bonuses or penalties are given to operators depending on the attainment of objectives set by the CRE. Other indicators, which do not carry financial incentives, complete the mechanism and ensure a broader surveillance of the operators' service quality. A financial incentive may be applied to these indicators at a later date if the CRE deems it necessary. The analyses of the service quality monitoring indicators presented in this report cover the period from 1 July 2010 to 30 June 2011. They were used to inform the work conducted to develop the incentive regulation mechanism for service quality in GrDF's ATRD4 tariff (A Third-party access to natural gas distribution networks, scheduled to enter into effect on 1 July 2012). The conclusions of the report will also be used by the CRE for ERDF as part of the work on TURPE 4 tariff (Tariff for the use of public electricity grids, scheduled to enter into effect during the third quarter of 2013), for natural gas local distribution companies (LDCs) to prepare their ATRD4 tariff (Entry into effect scheduled for 1 July 2013), as well as for GRTgaz and TIGF to define the future ATRT5 tariff (Third-party access to natural gas transmission networks, scheduled to enter into effect on 1 April 2013). Implemented in 2009 with an initial annual follow- up report on gas network operators Gr

  9. Exploring the context in which different close-to-community sexual and reproductive health service providers operate in Bangladesh: a qualitative study.

    Science.gov (United States)

    Mahmud, Ilias; Chowdhury, Sadia; Siddiqi, Bulbul Ashraf; Theobald, Sally; Ormel, Hermen; Biswas, Salauddin; Jahangir, Yamin Tauseef; Sarker, Malabika; Rashid, Sabina Faiz

    2015-09-01

    A range of formal and informal close-to-community (CTC) health service providers operate in an increasingly urbanized Bangladesh. Informal CTC health service providers play a key role in Bangladesh's pluralistic health system, yet the reasons for their popularity and their interactions with formal providers and the community are poorly understood. This paper aims to understand the factors shaping poor urban and rural women's choice of service provider for their sexual and reproductive health (SRH)-related problems and the interrelationships between these providers and communities. Building this evidence base is important, as the number and range of CTC providers continue to expand in both urban slums and rural communities in Bangladesh. This has implications for policy and future programme interventions addressing the poor women's SRH needs. Data was generated through 24 in-depth interviews with menstrual regulation clients, 12 focus group discussions with married men and women in communities and 24 semi-structured interviews with formal and informal CTC SRH service providers. Data was collected between July and September 2013 from three urban slums and one rural site in Dhaka and Sylhet, Bangladesh. Atlas.ti software was used to manage data analysis and coding, and a thematic analysis was undertaken. Poor women living in urban slums and rural areas visit a diverse range of CTC providers for SRH-related problems. Key factors influencing their choice of provider include the following: availability, accessibility, expenses and perceived quality of care, the latter being shaped by notions of trust, respect and familiarity. Informal providers are usually the first point of contact even for those clients who subsequently access SRH services from formal providers. Despite existing informal interactions between both types of providers and a shared understanding that this can be beneficial for clients, there is no effective link or partnership between these providers for

  10. Optimal Control and Operation Strategy for Wind Turbines Contributing to Grid Primary Frequency Regulation

    Directory of Open Access Journals (Sweden)

    Mun-Kyeom Kim

    2017-09-01

    Full Text Available This study introduces a frequency regulation strategy to enable the participation of wind turbines with permanent magnet synchronous generators (PMSGs. The optimal strategy focuses on developing the frequency support capability of PMSGs connected to the power system. Active power control is performed using maximum power point tracking (MPPT and de-loaded control to supply the required power reserve following a disturbance. A kinetic energy (KE reserve control is developed to enhance the frequency regulation capability of wind turbines. The coordination with the de-loaded control prevents instability in the PMSG wind system due to excessive KE discharge. A KE optimization method that maximizes the sum of the KE reserves at wind farms is also adopted to determine the de-loaded power reference for each PMSG wind turbine using the particle swarm optimization (PSO algorithm. To validate the effectiveness of the proposed optimal control and operation strategy, three different case studies are conducted using the PSCAD/EMTDC simulation tool. The results demonstrate that the optimal strategy enhances the frequency support contribution from PMSG wind turbines.

  11. Experimentation and mathematical simulation of the operation of a 300-kW boiler, equipped with a progressive regulation or on/off burner

    Energy Technology Data Exchange (ETDEWEB)

    Anglesio, P [Politecnico di Torino, Italy; Perthuis, E

    1980-04-01

    The results of an experimental study undertaken during tests run with domestic fuel oil and natural gas, are described. Losses via wall surfaces and exhaust gases are determined, and according to variations in output with the effective power of the boiler and the advantage of progressive regulation mode operation, from the energy point of view, are demonstrated. The mathematical model developed is presented. Simulation is obtained by considering thermal transfers in the hearth, and then the exchanger of the boiler. For continuous operation, two programs are presented. The first is used for adjustment to experimental results. A third program simulates discontinuous operation. Theoretical results slightly overestimate actual output, but confirm the advantage of progressive regulation. The economic study shows that the excess cost of a progressive modulation type burner tends to direct choice towards a compromise, in the form of a dual-rate (high/low) type burner.

  12. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  13. Regulation as Rhetoric

    DEFF Research Database (Denmark)

    Boll, Karen; Györy, Csaba

    This paper analyses the way regulatory agencies strategically use public ‘rhetoric’ and ‘management of appearance’ to strengthen their regulation. It reports a comparative study of the Securities and Exchange Commission (SEC) which is the US federal securities regulator and the Danish Tax...... and Customs Administration (SKAT) which is the national tax regulator in Denmark. SEC operates in a US context where the agency fights to get trust, while SKAT operates in a context where high trust in public agencies is a basic condition. We argue, however, that despite the radically different institutional...... engage reflectively in image promotion which serves two purposes: establishing and maintaining legitimacy in a particular social and political environment and producing compliance. Further, we argue that this regulation is a form of ‘post-bureaucratic’ regulation in which compliance is achieved...

  14. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  15. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  16. GSM Marketing Service Providers Operations and Customers Satisfaction in Nigeria: An Empirical Investigation

    Directory of Open Access Journals (Sweden)

    Adebisi Sunday Abayomi

    2011-06-01

    Full Text Available This study has been carried out on the GSM arm of the Nigerian Telecomunication sectorto primarily investigate the level of satisfaction that the subscribers of GSM service providers haveenjoyed in the seven years of operations in Nigeria. In testing this empirically, MTN, GLOBACOMand ZAIN were selected as case studies. 600 questionnaires were administered on the subscribers ofthese GSM service providers in the Six States of the South-Western Nigeria using the purposivesampling technique. In analyzing the collated data, three hypotheses were tested with the use ofPercentages, T-test, F-test, [at 95% confidence limit], Cross-tabulation [using the ‘Eta’ Directionalmeasure] and statistical charts. The results from the SPSS 16 output rejected the Null hypotheses.This further indicated that, the various factors that determined the level of subscribers’ satisfactionwere statistically significant. The study therefore concluded that, subscribers in Nigeria aredissatisfied with the services of their service providers hence, the need for the regulatory body; NCCto ensure that subscribers interests are protected. The study then suggested that,, the GSM serviceproviders should reposition themselves to give adequate value to subscribers money incommensuration with their own gains from the Nigeria Telecommunications market.

  17. Preparing for Construction and Operation of Geological Repositories - Challenges to the Regulator and the Implementer. Proceedings of the Joint RF/IGSC Workshop, Issy-les-Moulineaux, France, 25-27 January 2012

    International Nuclear Information System (INIS)

    2014-01-01

    diverse reflection of the various developmental levels of the different geological disposal programmes, ranging from general information on organisations and their licensing regimes, to specific information on technical, regulatory, managerial, administrative and procedural issues. This joint workshop was attended by a balanced mix of implementers and regulators from 14 countries and international organisations (e.g. IAEA, EU). Following the introductory session (Session 1), implementers and regulators from various national programmes (e.g. Finland, Sweden, Canada, Switzerland, etc.) presented their experiences and viewpoints on issues related to construction and operation of geological disposal facilities in Session 2. Session 3 of the workshop focused on industrial feasibility of construction in which key safety issues that must be addressed were presented and discussed. Session 4 continued to explore the issue of industrial feasibility but with the focus switched to the operation of geological repositories. Main operational issues and how to address accidents and disturbances in the design of the various disposal systems were presented. The impact of retrievability on the design and operation of a repository was also examined. The last session of the workshop, Session 5, evaluated various licensing aspects during repository development. Specifically, this session looked into how a licensing process affects the implementation of a repository and also the effect of optimization on late design modifications. To engage participants in more in-depth discussions on the presented topics and also to encourage professional exchange, 3 round table discussions were carried out in Sessions 3-5, to discuss the targeted questions. Results of the group discussions were reported by the rapporteurs. A synthesis of all presentations and conclusions of each session is provided in this document

  18. The international regulation of Informal Value Transfer Systems

    Directory of Open Access Journals (Sweden)

    Anand Ajay Shah

    2007-12-01

    Full Text Available After the 11th September 2001 attacks on the United States international attention quickly focused on the sources and methods of terrorist financing. Among the methods terrorists and other criminal actors use to transfer funds are Informal Value Transfer Systems (IVTS which operate either outside the formal financial sector, or through use of the formal financial sector, but without leaving a full record of the transaction. Though the vast majority of funds moved through IVTS are the earnings of migrant workers and immigrant communities, the lack of uniform worldwide regulation of IVTS provides ample opportunity for abuse and misuse. The international community primarily responded to IVTS concerns through the Financial Action Task Force on Money Laundering, which issued a series of recommendations and best practices for states in regulating IVTS operations. While these recommendations are a secure beginning to regulation of IVTS operating within ethnic communities, they fail to address the more modern forms of IVTS that have come about in the post-Cold War globalised world. Comprehensive recommendations governing all types of IVTS, as well as concerted international cooperation and coordination are necessary to address this global phenomenon.

  19. Safety Regulations for Ionizing Radiations. Vietnam Standard (TCVN 4397-87)

    International Nuclear Information System (INIS)

    1987-01-01

    The regulations were prepared for purpose of providing basic requirements of ionizing radiation protection and giving guide for design criteria of radiation installations in Vietnam. The allowable maximum levels for personnel categories are established. Regulated are methods for handling sealed and unsealed sources of radiation, transfer and transport of radioactive materials. Defined requirements and operating conditions that must be met. Determined are procedures and actions of decontamination. (N.H.A)

  20. Activation scheme to use performance indicators for the graded regulation on Korean NPPs

    International Nuclear Information System (INIS)

    Hwang, M. J.; Kang, D. I.; Kim, G. R.; Sung, G. Y.

    2003-01-01

    In this paper, we will provide an activation scheme of using performance indicators for graded regulation on Korean Nuclear Power Plants (NPPs). The safe operation of NPPs is the basic objective of nuclear society. To achieve the object, the direction of the regulation is established to regulate the risk of public health and safety. Therefore, it's essential to keep the safety of plants. However, it's not easy to define the appropriate safety level. So, the requirement of performance indicator establishment and framework establishment for safety management has been increased. Performance indicators can provide quantified safety value numerically. Therefore, we can increase the acceptance and trust of the public for safety of NPPs. Also, it helps pridictive regulation through the objective comparison of safety. Moreover, according to the importance of safety, we can allocate the resources effectively and lead an effort for the improvement of safety by comparison among nations and plants. The safety of a plant is affected by not only design but also the quality of operators, appropriate operation, maintenance and test. So, in this paper, we reviewed the application of performance indicators in domestic and foreign countries, and groped for a method to activate the use of performance indicators

  1. Application of the Non-Intervention Principle to Low-Intensity Cyber Operations

    OpenAIRE

    Adamson, Liisi

    2015-01-01

    Present work focuses on the non-intervention principle and low-intensity cyber operations. More specifically, its main question is, whether the principle of non-intervention applies to low-intensity cyber operations and if it does, is the legal framework of non-intervention principle an effective way to regulate peacetime low-intensity cyber operations. Information Age and the rapid development of ICTs have provided hostile actors the opportunity to exploit the advantages cyberspace offe...

  2. Regulator process for the authorization of an amendment to the operation license of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Perez, R.; Espinosa V, J.M.; Salgado, J.R.; Mamani, Y.R.

    2005-01-01

    The regulator process by which an authorization is granted from an amendment to the License of Operation of a nuclear power station in Mexico is described. It makes an appointment the effective legal mark, the technical characteristics of the modification, the evaluation process and deposition upon oath of tests and finally the elaboration of the Safety report and the Technical Verdict that is a correspondent for the regulator organism to the Secretary of Energy, the one that in turn is the responsible of granting the amendment the License just as it establishes it the Law. (Author)

  3. State-of-the-art incore detector system provides operational and safety benefits: Example, Hanford N Reactor

    International Nuclear Information System (INIS)

    Toffer, H.

    1988-08-01

    A presentation on the operational and safety benefits that can be derived from a state-of-the-art incore neutron monitoring system has been prepared for the DOE/ANL training course on ''The Potential Safety Impact of New and Emerging Technologies on the Operation of DOE Nuclear Facilities.'' Advanced incore neutron flux monitoring systems have been installed in some commercial reactors and should be considered for any new reactor designs or as backfits to existing plants. The recent installation of such a system at the Hanford N Reactor is used as an example in this presentation. Unfortunately, N Reactor has been placed in a cold standby condition and the full core incore system has not been tested under power conditions. Nevertheless, the evaluations that preceded the installation of the full core system provide interesting insight into the operational and safety benefits that could be expected

  4. Fundamental Drivers of the Cost and Price of Operating Reserves

    Energy Technology Data Exchange (ETDEWEB)

    Hummon, Marissa [National Renewable Energy Lab. (NREL), Golden, CO (United States); Denholm, Paul [National Renewable Energy Lab. (NREL), Golden, CO (United States); Jorgenson, Jennie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Palchak, David [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kirby, Brendan [Kirby Consultant; Ma, Ookie [U.S. Department of Energy, Washington, DC (United States)

    2013-07-01

    Operating reserves impose a cost on the electric power system by forcing system operators to keep partially loaded spinning generators available for responding to system contingencies variable demand. In many regions of the United States, thermal power plants provide a large fraction of the operating reserve requirement. Alternative sources of operating reserves, such as demand response and energy storage, may provide more efficient sources of these reserves. However, to estimate the potential value of these services, the cost of reserve services under various grid conditions must first be established. This analysis used a commercial grid simulation tool to evaluate the cost and price of several operating reserve services, including spinning contingency reserves and upward regulation reserves. These reserve products were evaluated in a utility system in the western United States, considering different system flexibilities, renewable energy penetration, and other sensitivities. The analysis demonstrates that the price of operating reserves depend highly on many assumptions regarding the operational flexibility of the generation fleet, including ramp rates and the fraction of fleet available to provide reserves.

  5. Competitive Electricity Market Regulation in the United States: A Primer

    Energy Technology Data Exchange (ETDEWEB)

    Flores-Espino, Francisco [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tian, Tian [National Renewable Energy Lab. (NREL), Golden, CO (United States); Chernyakhovskiy, Ilya [National Renewable Energy Lab. (NREL), Golden, CO (United States); Chernyakhovskiy, Ilya [National Renewable Energy Lab. (NREL), Golden, CO (United States); Miller, Mackay [National Grid, Warwick (United Kingdom)

    2016-12-01

    The electricity system in the United States is a complex mechanism where different technologies, jurisdictions and regulatory designs interact. Today, two major models for electricity commercialization operate in the United States. One is the regulated monopoly model, in which vertically integrated electricity providers are regulated by state commissions. The other is the competitive model, in which power producers can openly access transmission infrastructure and participate in wholesale electricity markets. This paper describes the origins, evolution, and current status of the regulations that enable competitive markets in the United States.

  6. Role and Responsibilities of the Operator

    International Nuclear Information System (INIS)

    Fox, M.; Bacon, A.

    2016-01-01

    As the world leader in the maritime transport of radioactive material (RAM) International Nuclear Service (INS) and its subsidiary, Pacific Nuclear Transport Limited (PNTL) have pioneered the standards for safe and secure transport operations. This paper will highlight these standards from an operator's perspective and provide an overview of how the company would respond to a safety or security related incident. In matching these standards against the national and international maritime regulations, INS will continue to lead the way on the worldwide transport of RAM thus supporting the nuclear fuel cycle and overall global threat reduction. (author)

  7. Cooperative Optimal Operation of Wind-Storage Facilities

    DEFF Research Database (Denmark)

    Farashbashi-Astaneh, Seyed-Mostafa; Hu, Weihao; Chen, Zhe

    2014-01-01

    investment cost. We suggest benefitting the storage unit as a regulation service provider beside its normal operation for mitigating wind power imbalances. This idea comes from the fact that storage units have a fast ramping capability which is necessary to meet close to real-time regulation needs......As the penetration of wind power increases in power systems across the world, wind forecast errors become an emerging problem. Storage units are reliable tools to be used in cooperation with wind farms to mitigate imbalance penalties. Nevertheless they are not still economically viable due to huge....... In this paper a framework is proposed to formulate the optimal design of storage unit’s operation under different scenarios. These scenarios include whether the wind farm is actually generating more or less than the scheduled level submitted to day-ahead market. The results emphasize that the deployment...

  8. Optimal Scheduling of an Regional Integrated Energy System with Energy Storage Systems for Service Regulation

    Directory of Open Access Journals (Sweden)

    Hengrui Ma

    2018-01-01

    Full Text Available Ancillary services are critical to maintaining the safe and stable operation of power systems that contain a high penetration level of renewable energy resources. As a high-quality regulation resource, the regional integrated energy system (RIES with energy storage system (ESS can effectively adjust the non-negligible frequency offset caused by the renewable energy integration into the power system, and help solve the problem of power system frequency stability. In this paper, the optimization model aiming at regional integrated energy system as a participant in the regulation market based on pay-for-performance is established. Meanwhile YALMIP + CPLEX is used to simulate and analyze the total operating cost under different dispatch modes. This paper uses the actual operation model of the PJM regulation market to guide the optimal allocation of regulation resource in the regional integrated energy system, and provides a balance between the power trading revenue and regulation market revenue in order to achieve the maximum profit.

  9. Regulation Of Hydraulic Fracturing In South Africa: A Project Life-Cycle Approach?

    Directory of Open Access Journals (Sweden)

    Willemien du Plessis

    2015-12-01

    Full Text Available This note deals with the 2015 regulations pertaining to hydraulic fracturing in South Africa from a project life-cycle approach. A brief history of the fragmentation of the regulation of environmental and mining related matters is provided, followed by a discussion of the application of the 2015 regulations during the project life cycle, ie the pre-commencement phase, the design and authorisation phase, the testing phase, the operational phase and the decommissioning and closure phase.

  10. Multi-Output Power Converter, Operated from a Regulated Input Bus, for the Sireus Rate Sensor

    Directory of Open Access Journals (Sweden)

    Torrecilla Marcos Compadre

    2017-01-01

    Full Text Available This paper describes a DC to DC converter designed to meet the power supply requirements of the SiREUS Coarse Rate Sensor (CRS which is a 3-axis MEMS Rate Sensor (MRS that uses a resonating ring gyro and will be used in different ESA missions. The converter supplies +5V, −5V, 3.3V, 1.8V and 40V and it has been designed and prototyped by Clyde Space Ltd with the EQM and FM units being manufactured by Selex ES. The first model was designed for a 28V un-regulated bus and the second model presented here has been designed for a 50V regulated bus. PWM voltage regulation was not used because of the noise requirements and the regulated input bus allowed an unregulated power stage approach. There are also stringent volume and interface constraints, which also affected the design. For such reasons, a fixed dutycycle, quasi-resonant single-ended topology with output linear regulators has been implemented; having the advantages of providing low switching losses, low radiated and conducted noise and no over-voltage failure mode. This paper highlights the techniques used to satisfy stringent noise and protection requirements of the load.

  11. Panel presentation: Should some type of incentive regulation replace traditional methods for regulating LDC's?

    International Nuclear Information System (INIS)

    Farman, R.D.

    1992-01-01

    This paper discusses the wants and fears of gas utility companies with regards to incentive regulation. The idea of replacing the traditional rate-of-return regulation with incentive regulation sound very desirous in that it should provide greater management flexibility, quicker and more streamlined regulatory processes, and utility financial rewards based on how well customer needs are met. However, the main fear is that this could result in arbitrary, inappropriate productivity or efficiency targets, or would embody a risk/reward ratio skewed more heavily toward financial penalties than opportunities to increase earnings. The paper presents some of the obstacles of traditional regulation which include a lack of incentive to minimize operational costs; a lack of incentive to introduce new technology, products, or services; prevent the need for flexibility to compete in contestable markets; and the diversion caused by utility managers having to manage the regulatory process rather than delivering value to customers. The paper concludes by comparing the incentive regulation program used in the telecommunications industry to the natural gas industry to demonstrate why the success of the telecommunications model doesn't apply to the gas utilities incentive model

  12. Proteome analysis provides insight into the regulation of bioactive metabolites in Hericium erinaceus.

    Science.gov (United States)

    Zeng, Xu; Ling, Hong; Yang, Jianwen; Chen, Juan; Guo, Shunxing

    2018-05-05

    Hericium erinaceus, a famous edible mushroom, is also a well-known traditional medicinal fungus. To date, a large number of bioactive metabolites with antitumor, antibacterial, and immune-boosting effects were isolated from the free-living mycelium and fruiting body of H. erinaceus. Here we used the proteomic approach to explore proteins involved in the regulation of bioactive metabolites, including terpenoid, polyketide, sterol and etc. RESULTS: Using mass spectrometry, a total of 2543 unique proteins were identified using H. erinaceus genome, of which 2449, 1855, 1533 and 690 proteins were successfully annotated in Nr, KOG, KEGG and GO databases. Among them, 722 proteins were differentially expressed (528 up- and 194 down-regulated) in fruiting body compared with mycelium. Most of differentially expressed proteins were putatively involved in energy metabolism, molecular signaling, and secondary metabolism. Additionally, numerous proteins involved in terpenoid, polyketide, and sterol biosynthesis were identified. Our data revealed that proteins involved in polyketide biosynthesis were up-regulated in the fruiting body, while some proteins in mevalonate (MEP) pathway from terpenoid biosynthesis were generally up-regulated in mycelium. The present study suggested that the differential regulation of biosynthesis genes could produce various bioactive metabolites with pharmacological effects in H. erinaceus. Copyright © 2017. Published by Elsevier B.V.

  13. Improving nuclear regulation. NEA regulatory guidance booklets volumes 1-14

    International Nuclear Information System (INIS)

    2011-01-01

    A common theme throughout the series of NEA regulatory guidance reports, or 'green booklets', is the premise that the fundamental objective of all nuclear safety regulatory bodies is to ensure that nuclear facilities are continuously maintained and operated in an acceptably safe manner. In meeting this objective the regulator must bear in mind that it is the operator that has responsibility for safely operating the nuclear facility; the role of the regulator is to assess and to provide assurance regarding the operator's activities in terms of assuming that responsibility. The full series of these reports was brought together in one edition for the first time in 2009 and was widely found to be a useful resource. This second edition comprises 14 volumes, including the latest on The Nuclear Regulator's Role in Assessing Licensee Oversight of Vendor and Other Contracted Services. The reports address various challenges that could apply throughout the lifetime of a nuclear facility, including design, siting, manufacturing, construction, commissioning, operation, maintenance and decommissioning. The compilation is intended to serve as a knowledge management tool both for current regulators and the new nuclear professionals and organisations entering the regulatory field. Contents: Executive Summary; Regulatory Challenges: 1. The Role of the Nuclear Regulator in Promoting and Evaluating Safety Culture; 2. Regulatory Response Strategies for Safety Culture Problems; 3. Nuclear Regulatory Challenges Related to Human Performance; 4. Regulatory Challenges in Using Nuclear Operating Experience; 5. Nuclear Regulatory Review of Licensee Self-assessment (LSA); 6. Nuclear Regulatory Challenges Arising from Competition in Electricity Markets; 7. The Nuclear Regulatory Challenge of Judging Safety Back-fits; 8. The Regulatory Challenges of Decommissioning Nuclear Reactors; 9. The Nuclear Regulator's Role in Assessing Licensee Oversight of Vendor and Other Contracted Services

  14. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  15. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  16. ‘Standard’ incentive regulation hinders the integration of renewable energy generation

    International Nuclear Information System (INIS)

    Nykamp, Stefan; Andor, Mark; Hurink, Johann L.

    2012-01-01

    The connection and distribution of growing, decentralized electricity generation from renewable energy sources (RES-E) is leading to massive investment needs. Besides investing in additional ‘conventional’ assets (e.g. cables), grid operators can also invest in innovative ‘smart solutions’ like local storage capacities or voltage regulation appliances, which may be a more suitable way of integrating RES-E. This paper investigates the influence of incentive regulation on the investment decision of grid operators to integrate RES-E. We describe the technical and regulatory background, explain the advantages of ‘smart solutions’ and present an approach for comparing investment scenarios. As an example, we calculate the profitability of investments in a case study of the German electricity market. We apply Data Envelopment Analysis (DEA) and Stochastic Frontier Analysis (SFA) to show the influence of the investment alternatives on grid operator efficiency objectives. We demonstrate that under current ‘standard’ incentive regulation, the grid operators gain profitability by avoiding investments and – if they are forced to invest – by not implementing ‘smart solutions’. The results highlight the need to consider innovation in the regulation design. Further research should investigate specific instruments that can be used to account for innovation. Our brief discussion of such instruments provides a starting point. - Highlights: ► We measure the influence of investments on efficiency by applying DEA and SFA. ► We compare the profitability of alternative investments under incentive regulation. ► Incentive regulation gives incentives to refuse investment at all. ► If DSOs are forced to invest, reinforcement is preferable to smart solutions. ► Ways to consider innovation in incentive regulations are required and discussed.

  17. Operational risk quantification and modelling within Romanian insurance industry

    Directory of Open Access Journals (Sweden)

    Tudor Răzvan

    2017-07-01

    Full Text Available This paper aims at covering and describing the shortcomings of various models used to quantify and model the operational risk within insurance industry with a particular focus on Romanian specific regulation: Norm 6/2015 concerning the operational risk issued by IT systems. While most of the local insurers are focusing on implementing the standard model to compute the Operational Risk solvency capital required, the local regulator has issued a local norm that requires to identify and assess the IT based operational risks from an ISO 27001 perspective. The challenges raised by the correlations assumed in the Standard model are substantially increased by this new regulation that requires only the identification and quantification of the IT operational risks. The solvency capital requirement stipulated by the implementation of Solvency II doesn’t recommend a model or formula on how to integrate the newly identified risks in the Operational Risk capital requirements. In this context we are going to assess the academic and practitioner’s understanding in what concerns: The Frequency-Severity approach, Bayesian estimation techniques, Scenario Analysis and Risk Accounting based on risk units, and how they could support the modelling of operational risk that are IT based. Developing an internal model only for the operational risk capital requirement proved to be, so far, costly and not necessarily beneficial for the local insurers. As the IT component will play a key role in the future of the insurance industry, the result of this analysis will provide a specific approach in operational risk modelling that can be implemented in the context of Solvency II, in a particular situation when (internal or external operational risk databases are scarce or not available.

  18. Commission for Energy regulation (CRE) - Activity report June 2005; Commission de regulation de l'energie (CRE) - Rapport d'activite juin 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2005 activity report of CRE. Content: A - The opening of the markets in France and in Europe: The opening of the markets one year after 1 July 2004 (An especially important step, Electricity and gas: a common framework with structural differences, The coexistence of market prices and regulated tariffs); The European texts of 26 June 2003 (Texts to give new impetus, Texts to harmonize the role and powers of national regulators, Texts to guarantee the independence of system operators, Texts to ensure transparent and non-discriminatory access to networks, Texts providing for strengthening of interconnections); The outlook for 2007, a fully open market (1 July 2007: a date set by the directives, Priority given to informing and protecting consumers); B - Regulation of the natural gas market: The gas market in the European context (Europe's dependency on imports is increasing, Gas prices increased considerably across the whole of Europe in 2004, The European gas scene continues to be dominated by a small number of players, Gas infrastructures need to be developed in Europe, The new European

  19. Limit regulation system for pressurized water nuclear reactors

    International Nuclear Information System (INIS)

    Aleite, W.; Bock, H.W.

    1976-01-01

    Described is a limit regulation system for a pressurized water nuclear reactor in combination with a steam generating system connected to a turbine, the nuclear reactor having control rods as well as an operational regulation system and a protective system, which includes reactor power limiting means operatively associated with the control rods for positioning the same and having response values between operating ranges of the operational regulation system, on the one hand, and response values of the protective system, on the other hand, and a live steam-minimal pressure regulation system cooperating with the reactor power limiting means and operatively connected to a steam inlet valve to the turbine for controlling the same

  20. Ultra-Low-Dropout Linear Regulator

    Science.gov (United States)

    Thornton, Trevor; Lepkowski, William; Wilk, Seth

    2011-01-01

    A radiation-tolerant, ultra-low-dropout linear regulator can operate between -150 and 150 C. Prototype components were demonstrated to be performing well after a total ionizing dose of 1 Mrad (Si). Unlike existing components, the linear regulator developed during this activity is unconditionally stable over all operating regimes without the need for an external compensation capacitor. The absence of an external capacitor reduces overall system mass/volume, increases reliability, and lowers cost. Linear regulators generate a precisely controlled voltage for electronic circuits regardless of fluctuations in the load current that the circuit draws from the regulator.

  1. Distributed resources and re-regulated electricity markets

    International Nuclear Information System (INIS)

    Ackermann, Thomas

    2007-01-01

    This paper briefly defines distributed resources (DR) and discusses the current status of DR. The main focus is on discussing the value DR can provide to re-regulated electricity markets. DR can, under certain circumstances, help to significantly reduce the main problem of re-regulation, i.e. market power. Distributed generation and demand-side resources may, even if only small quantities in terms of size of the entire market are utilised, be able to help to significantly reduce market power. This results in a significantly more efficient market. To achieve such benefits, however, DR must be in operation during times when market power issues are likely to arise. To a certain extent this is the case as demand-side resources are usually independent of established generation companies. In addition, many business cases for DG require DG to actually operate to capture the second revenue. (author)

  2. Regulations and Procedures Manual

    Energy Technology Data Exchange (ETDEWEB)

    Young, Lydia J. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2011-07-25

    The purpose of the Regulations and Procedures Manual (RPM) is to provide LBNL personnel with a reference to University and Lawrence Berkeley National Laboratory (LBNL or Laboratory) policies and regulations by outlining normal practices and answering most policy questions that arise in the day-to-day operations of Laboratory organizations. Much of the information in this manual has been condensed from detail provided in LBNL procedure manuals, Department of Energy (DOE) directives, and Contract DE-AC02-05CH11231. This manual is not intended, however, to replace any of those documents. RPM sections on personnel apply only to employees who are not represented by unions. Personnel policies pertaining to employees represented by unions may be found in their labor agreements. Questions concerning policy interpretation should be directed to the LBNL organization responsible for the particular policy. A link to the Managers Responsible for RPM Sections is available on the RPM home page. If it is not clear which organization is responsible for a policy, please contact Requirements Manager Lydia Young or the RPM Editor.

  3. Order for execution of the law concerning regulations of nuclear source materials, nuclear fuel materials and reactors

    International Nuclear Information System (INIS)

    1987-01-01

    Chapeter 1 specifies regulations concerning business management for refining and processing, which cover application for designation of refining operation, application for permission for processing operation, and approval of personnel responsible for handling nuclear fuel. Chapter 2 specifies regulations concerning construction and operation of nuclear reactors, which cover application for construction of nuclear reactors, reactors in a research and development stage, application for permission concerning nuclear reactors mounted on foreign nuclear powered ships, application for permission for alteration concerning construction of nuclear reactors, application for permission for alteration concerning nuclear reactors mounted on foreign nuclear powered ships, nuclear reactor facilities to be subjected to regular inspection, nuclear reactor for which submission of operation plan is not required, and application for permission for transfer of nuclear reactor. Chapter 2 also specifies regulations concerning business management for reprocessing and waste disposal. Chapter 3 stipulates regulations concerning use of nuclear fuel substances, nuclear material substances and other substances covered by international regulations, which include rules for application for permission for use of nuclear fuel substances, etc. Supplementary provisions are provided in Chapter 4. (Nogami, K.)

  4. Regulatory environment of transitioning to risk-informed regulations in U.S.A

    International Nuclear Information System (INIS)

    Choi, C. H.; Kim, C. H.

    1999-01-01

    With the publication of the PRA Policy Statement and recent regulatory guides, the U.S.NRC makes a continuous approach towards risk-informed regulations with the goal of establishing an overall framework for risk-informed decisions in all regulatory activities as well as plant specific licensing issues. Faced with the changing environment of deregulation of the electricity generation market, the licensee's effort to reduce design margins to enhance flexibility and to relieve unnecessary regulatory burdens have been focused on the control and reduction of plant operating costs. The risk-informed approach provides a structured, systematic, and defensible method that can be applied not only to rulemaking, but also to licensing, inspection, enforcement, and performance assessment, as well as provides basis for prioritization in the establishment of programs and the allocation of resources. This report describes the current regulatory environment of transitioning to risk-informed regulations with an emphasis on its background, concepts, regulatory guides, proposed options for modifying the 10CFR50, and risk-informed applications in U.S.A. Review of the risk informed applications utilizing the information provided by the PRAs and their insights in the U.S.NRC and nuclear industry will provide the insights of predicting the expected regulation changes in Korea. Also it could provide the applicable methods or guides for the implementation of the risk-informed applications in plant design and operations. (author)

  5. Understanding cell cycle and cell death regulation provides novel weapons against human diseases.

    Science.gov (United States)

    Wiman, K G; Zhivotovsky, B

    2017-05-01

    Cell division, cell differentiation and cell death are the three principal physiological processes that regulate tissue homoeostasis in multicellular organisms. The growth and survival of cells as well as the integrity of the genome are regulated by a complex network of pathways, in which cell cycle checkpoints, DNA repair and programmed cell death have critical roles. Disruption of genomic integrity and impaired regulation of cell death may both lead to uncontrolled cell growth. Compromised cell death can also favour genomic instability. It is becoming increasingly clear that dysregulation of cell cycle and cell death processes plays an important role in the development of major disorders such as cancer, cardiovascular disease, infection, inflammation and neurodegenerative diseases. Research achievements in these fields have led to the development of novel approaches for treatment of various conditions associated with abnormalities in the regulation of cell cycle progression or cell death. A better understanding of how cellular life-and-death processes are regulated is essential for this development. To highlight these important advances, the Third Nobel Conference entitled 'The Cell Cycle and Cell Death in Disease' was organized at Karolinska Institutet in 2016. In this review we will summarize current understanding of cell cycle progression and cell death and discuss some of the recent advances in therapeutic applications in pathological conditions such as cancer, neurological disorders and inflammation. © 2017 The Association for the Publication of the Journal of Internal Medicine.

  6. Integrated approach to optimize operation and maintenance costs for operating nuclear power plants

    International Nuclear Information System (INIS)

    2006-06-01

    In the context of increasingly open electricity markets and the 'unbundling' of generating companies from former utility monopolies, an area of major concern is the economic performance of the existing fleet of nuclear power plants. Nuclear power, inevitably, must compete directly with other electricity generation sources. Coping with this competitive pressure is a challenge that the nuclear industry should meet if the nuclear option is to remain a viable one. This competitive environment has significant implications for nuclear plant operations, including, among others, the need for the more cost effective management of plant activities, and the greater use of analytical tools to balance the costs and benefits of proposed activities, in order to optimize operation and maintenance costs, and thus insure the economic competitiveness of existing nuclear power plants. In the framework of the activities on Nuclear Economic Performance Information System (NEPIS), the IAEA embarked in developing guidance on optimization of operation and maintenance costs for nuclear power plants. The report was prepared building on the fundamental that optimization of operation and maintenance costs of a nuclear power plant is a key component of a broader integrated business strategic planning process, having as overall result achievement of organization's business objectives. It provides advice on optimization of O and M costs in the framework of strategic business planning, with additional details on operational planning and controlling. This TECDOC was elaborated in 2004-2005 in the framework of the IAEA's programme on Nuclear Power Plant Operating Performance and Life Cycle Management, with the support of two consultants meetings and one technical meeting and based on contributions provided by participants. It can serve as a useful reference for the management and operation staff within utilities, nuclear power plant operators and regulators and other organizations involved in

  7. Issues and approaches in control for autonomous reactor operation

    International Nuclear Information System (INIS)

    Vilim, R. B.; Khalil, H. S.; Wei, T. Y. C.

    2000-01-01

    A capability for autonomous and passively safe operation is one of the goals of the NERI funded development of Generation IV nuclear plants. An approach is described for evaluating the effect of increasing autonomy on safety margins and load behavior and for examining issues that arise with increasing autonomy and their potential impact on performance. The method provides a formal approach to the process of exploiting the innate self-regulating property of a reactor to make it less dependent on operator action and less vulnerable to automatic control system fault and/or operator error. Some preliminary results are given

  8. Consideration of hot channel factors in design for providing operating margins on coolant channel outlet temperature

    International Nuclear Information System (INIS)

    Sharma, V.K.; Surendar, C.; Bapat, C.N.

    1994-01-01

    The Indian Pressurized Heavy Water Reactors (IPHWR) are horizontal pressure tube reactors using natural uranium oxide fuel in the form of short (495 mm) clusters. The fuel clusters in the Zr-Nb pressure tubes are cooled by high pressure, high temperature and subcooled circulating heavy water. Coolant flow distribution to individual channels is designed to match the power distribution so as to obtain uniform coolant outlet temperature. However, during operation, the coolant outlet temperature in individual channels deviate from their nominal value due to: tolerances in process design; effects of grid frequency on the pump speed; deviation in channel powers from the nominal values due to on-power fuelling and movement of reactivity devices, and so on. Thus an operating margin, between the highest permissible and nominal coolant outlet temperatures, is required taking into account various hot channel factors that contribute to higher coolant outlet temperatures. The paper discusses the methodology adopted to assess various hot channel factors which would provide optimum operating margins while ensuring sub-cooling. (author)

  9. Operating reactors licensing actions summary. Volume 5, No. 9

    International Nuclear Information System (INIS)

    1985-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  10. Operating reactors licensing actions summary. Volume 5, No. 8

    International Nuclear Information System (INIS)

    1985-10-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  11. Operating reactors licensing actions summary. Volume 4, No. 9

    International Nuclear Information System (INIS)

    1984-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the division of licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  12. Operating reactors licensing actions summary. Vol. 4, No. 2

    International Nuclear Information System (INIS)

    1984-04-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  13. Application of Physiological Self-Regulation and Adaptive Task Allocation Techniques for Controlling Operator Hazardous States of Awareness

    Science.gov (United States)

    Prinzel, Lawrence J., III; Pope, Alan T.; Freeman, Frederick G.

    2001-01-01

    Prinzel, Hadley, Freeman, and Mikulka found that adaptive task allocation significantly enhanced performance only when used at the endpoints of the task workload continuum (i.e., very low or high workload), but that the technique degraded performance if invoked during other levels of task demand. These researchers suggested that other techniques should be used in conjunction with adaptive automation to help minimize the onset of hazardous states of awareness (HSA) and keep the operator 'in-the-loop.' The paper reports on such a technique that uses psychophysiological self-regulation to modulate the level of task engagement. Eighteen participants were assigned to three groups (self-regulation, false feedback, and control) and performed a compensatory tracking task that was cycled between three levels of task difficulty on the basis of the electroencephalogram (EEG) record. Those participants who had received self-regulation training performed significantly better and reported lower NASA-TLX scores than participants in the false feedback and control groups. Furthermore, the false feedback and control groups had significantly more task allocations resulting in return-to-manual performance decrements and higher EEG difference scores. Theoretical and practical implications of these results for adaptive automation are discussed.

  14. Regulating the for-profit private healthcare providers towards universal health coverage: A qualitative study of legal and organizational framework in Mongolia.

    Science.gov (United States)

    Tsevelvaanchig, Uranchimeg; Narula, Indermohan S; Gouda, Hebe; Hill, Peter S

    2018-01-01

    Regulating the behavior of private providers in the context of mixed health systems has become increasingly important and challenging in many developing countries moving towards universal health coverage including Mongolia. This study examines the current regulatory architecture for private healthcare in Mongolia exploring its role for improving accessibility, affordability, and quality of private care and identifies gaps in policy design and implementation. Qualitative research methods were used including documentary review, analysis, and in-depth interviews with 45 representatives of key actors involved in and affected by regulations in Mongolia's mixed health system, along with long-term participant observation. There has been extensive legal documentation developed regulating private healthcare, with specific organizations assigned to conduct health regulations and inspections. However, the regulatory architecture for healthcare in Mongolia is not optimally designed to improve affordability and quality of private care. This is not limited only to private care: important regulatory functions targeted to quality of care do not exist at the national level. The imprecise content and details of regulations in laws inviting increased political interference, governance issues, unclear roles, and responsibilities of different government regulatory bodies have contributed to failures in implementation of existing regulations. Copyright © 2017 John Wiley & Sons, Ltd.

  15. A Flexible Binding Site Architecture Provides New Insights into CcpA Global Regulation in Gram-Positive Bacteria

    Directory of Open Access Journals (Sweden)

    Yunpeng Yang

    2017-01-01

    Full Text Available Catabolite control protein A (CcpA is the master regulator in Gram-positive bacteria that mediates carbon catabolite repression (CCR and carbon catabolite activation (CCA, two fundamental regulatory mechanisms that enable competitive advantages in carbon catabolism. It is generally regarded that CcpA exerts its regulatory role by binding to a typical 14- to 16-nucleotide (nt consensus site that is called a catabolite response element (cre within the target regions. However, here we report a previously unknown noncanonical flexible architecture of the CcpA-binding site in solventogenic clostridia, providing new mechanistic insights into catabolite regulation. This novel CcpA-binding site, named crevar, has a unique architecture that consists of two inverted repeats and an intervening spacer, all of which are variable in nucleotide composition and length, except for a 6-bp core palindromic sequence (TGTAAA/TTTACA. It was found that the length of the intervening spacer of crevar can affect CcpA binding affinity, and moreover, the core palindromic sequence of crevar is the key structure for regulation. Such a variable architecture of crevar shows potential importance for CcpA’s diverse and fine regulation. A total of 103 potential crevar sites were discovered in solventogenic Clostridium acetobutylicum, of which 42 sites were picked out for electrophoretic mobility shift assays (EMSAs, and 30 sites were confirmed to be bound by CcpA. These 30 crevar sites are associated with 27 genes involved in many important pathways. Also of significance, the crevar sites are found to be widespread and function in a great number of taxonomically different Gram-positive bacteria, including pathogens, suggesting their global role in Gram-positive bacteria.

  16. Regulatory challenges in using nuclear operating experience

    International Nuclear Information System (INIS)

    2006-01-01

    There can be no doubt that the systematic evaluation of operating experience by the operator and the regulator is essential for continued safe operation of nuclear power plants. Recent concerns have been voiced that the operating experience information and insights are not being used effectively to promote safety. If these concerns foreshadow a real trend in OECD countries toward complacency in reporting and analysing operating events and taking corrective actions, then past experience suggests that similar or even more serious events will recur. This report discusses how the regulator can take actions to assure that operators have effective programmes to collect and analyse operating experience and, just as important, for taking steps to follow up with actions to prevent the events and conditions from recurring. These regulatory actions include special inspections of an operator operating experience programme and discussion with senior plant managers to emphasize the importance of having an effective operating experience programme. In addition to overseeing the operator programmes, the regulator has the broader responsibility for assuring that industry-wide trends, both national and international are monitored. To meet these responsibilities, the regulatory body must have its own operating experience programme, and this report discusses the important attributes of such regulatory programmes. It is especially important for the regulator to have the capability for assessing the full scope of operating experience issues, including those that may not be included in an operator operating experience programme, such as new research results, international operating experience, and broad industry trend information. (author)

  17. 78 FR 28276 - Operating Limitations at John F. Kennedy International Airport

    Science.gov (United States)

    2013-05-14

    ... Internet by: (1) Searching the Federal eRulemaking Portal ( http://www.regulations.gov ); (2) Visiting the... significant congestion and delays that negatively impacted the National Airspace System (NAS). In January 2008... usage requirement for Operating Authorizations (OAs) with defined exceptions; (3) provides a mechanism...

  18. Commission for Energy regulation (CRE) - Activity report June 2005

    International Nuclear Information System (INIS)

    2005-01-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2005 activity report of CRE. Content: A - The opening of the markets in France and in Europe: The opening of the markets one year after 1 July 2004 (An especially important step, Electricity and gas: a common framework with structural differences, The coexistence of market prices and regulated tariffs); The European texts of 26 June 2003 (Texts to give new impetus, Texts to harmonize the role and powers of national regulators, Texts to guarantee the independence of system operators, Texts to ensure transparent and non-discriminatory access to networks, Texts providing for strengthening of interconnections); The outlook for 2007, a fully open market (1 July 2007: a date set by the directives, Priority given to informing and protecting consumers); B - Regulation of the natural gas market: The gas market in the European context (Europe's dependency on imports is increasing, Gas prices increased considerably across the whole of Europe in 2004, The European gas scene continues to be dominated by a small number of players, Gas infrastructures need to be developed in Europe, The new European

  19. Providing an integrated waste management strategy and operation focused on project end states at the Hanford site

    International Nuclear Information System (INIS)

    Blackford, L.

    2009-01-01

    CH2M HILL Plateau Remediation Company (CHPRC) is the U.S. Department of Energy's (DOE) contractor responsible for the safe, environmental cleanup of the Central Plateau of the Hanford Site. The 586-square-mile Hanford Site is located along the Columbia River in southeastern Washington State. A plutonium production complex with nine nuclear reactors and associated processing facilities, Hanford played a pivotal role in the nation's defense for more than 40 years, beginning in the 1940's with the Manhattan Project. Today, under the direction of the DOE, Hanford is engaged in the world's largest environmental cleanup project. The Plateau Remediation Contract (PRC) is a 10-year project paving the way for closure of the Hanford Site through demolition of the Plutonium Finishing Plant; remediation of six burial grounds and 11 groundwater systems; treatment of 43.8 meters of sludge; and disposition of 8,200 meters of transuranic waste, 800 spent nuclear material containers, 2,100 metric tons of spent nuclear fuel, and two reactors. The $4.5 billion project, funded through the U.S. DOE Office of Environmental Management, focuses equally on reducing risks to workers, the public, and the environment and on protecting the Columbia River. The DOE, which operates the Hanford Site, the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology) signed a comprehensive cleanup and compliance agreement on May 15, 1989. The Hanford Federal Facility Agreement and Consent Order, or Tri-Party Agreement (TPA), is an agreement for achieving compliance with the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) remedial action provisions and with the Resource Conservation and Recovery Act (RCRA) treatment, storage, and disposal (TSD) unit regulations and corrective action provisions . More specifically, the Tri-Party Agreement does the following: 1) defines and ranks CERCLA and RCRA cleanup commitments; 2) establishes

  20. Expert system for operational personnel support during power unit operation control in regulation range

    International Nuclear Information System (INIS)

    Yanitskij, V.A.

    1992-01-01

    The problems met when developing the systems for NPP operator support in the process of power unit operation are considered. The expert system for NPP personnel intelligent support combining the properties belonging to the artificial intelligence systems including selection of the analysis method taking into account the concrete technological situation and capability of application of algothmic calculations of the equipment characteristics using the information accumulated during the system development, erection and operation is described

  1. Retail experience in the de-regulated market

    International Nuclear Information System (INIS)

    Cummings, R.

    2003-01-01

    This paper describes the experience gained to date in the de-regulated electricity market through an examination of the commercial market. In 2001, chaos provided opportunity, while in 2002 the emphasis was on operations. In 2003, the landscape reflected hyper-competition, selling second services, and a changing landscape. A discussion followed on the residential market with a look at market structure, economics, and uncertainty concerning the future. The following components were identified as working well: wholesale market, commercial market, market model/data, and innovation in offerings and green supply. Areas requiring further improvement were also identified. It was suggested that the residential de-regulated roadmap should be clarified and retail friendly transactions should be imposed. Other improvements involve education and operations/system capabilities. The author concluded that the deregulated electricity market is still an immature market, where progress is being made in the commercial market. The residential market is in a critical period, with a market model still evolving. figs

  2. Royalty rules : Alberta producers are now beholden to formal regulations for reporting royalty payments to government levy collectors

    International Nuclear Information System (INIS)

    Cook, D.

    2006-01-01

    The Petroleum Marketing Regulation was established by the Alberta Department of Energy in July 2005 in order to clarify the rules governing conventional crude oil royalties. The regulation provides an incentive for industry to comply with the long-existing oil royalty reporting requirements through the addition of non-compliance penalties. An initial shadow billing system has been implemented to give industry the opportunity to understand their responsibilities and implement procedures to correct reporting and delivery inaccuracies. Battery operators in Alberta must now submit a royalty report to the Alberta Petroleum Marketing Commission on a monthly basis. The regulation provides provisions for interest charges on outstanding invoiced amounts, and formalizes existing eligibility requirements for the reimbursement of trucking costs associated with transporting the Crown's share. Penalties will be incurred if royalty reports contain erroneous information, or if the actual deliveries made are less than the prescribed royalty quantity. All penalties levied by the commission will now be sent to the battery operator in a monthly statement. Battery operators who wish to appeal their penalties may do so within 2 months after the date of the monthly statement. It was concluded that industry is not expected to experience any significant problems when the regulation comes into effect, as the 6 month shadow billing period will allow companies to make a smooth transition to the requirements of the new regulation. Details of information sessions for the new regulation were provided, as well as details of various non-compliance penalties. 1 fig

  3. Active and inactive enhancers co-operate to exert localized and long-range control of gene regulation

    Science.gov (United States)

    Proudhon, Charlotte; Snetkova, Valentina; Raviram, Ramya; Lobry, Camille; Badri, Sana; Jiang, Tingting; Hao, Bingtao; Trimarchi, Thomas; Kluger, Yuval; Aifantis, Iannis; Bonneau, Richard; Skok, Jane A

    2016-01-01

    V(D)J recombination relies on the presence of proximal enhancers that activate the antigen receptor (AgR) loci in a lineage and stage specific manner. Unexpectedly we find that both active and inactive AgR enhancers co-operate to disseminate their effects in a localized and long-range manner. Here we demonstrate the importance of short-range contacts between active enhancers that constitute an Igk super-enhancer in B cells. Deletion of one element reduces the interaction frequency between other enhancers in the hub, which compromises the transcriptional output of each component. We further establish that in T cells long-range contact and co-operation between the inactive Igk enhancer, MiEκ and the active Tcrb enhancer, Eβ, alters enrichment of CBFβ binding in a manner that impacts Tcrb recombination. These findings underline the complexities of enhancer regulation and point to a role for localized and long-range enhancer-sharing between active and inactive elements in lineage and stage specific control. PMID:27239026

  4. Repository operational criteria comparative analysis

    International Nuclear Information System (INIS)

    Hageman, J.P.; Chowdhury, A.H.

    1994-06-01

    The objective of the ''Repository Operational Criteria (ROC) Feasibility Studies'' (or ROC task) was to conduct comprehensive and integrated analyses of repository design, construction, and operations criteria in 10 CFR Part 60 regulations considering the interfaces among the components of the regulations and impacts of any potential changes to those regulations. The ROC task addresses regulatory criteria and uncertainties related to the preclosure aspects of the geologic repository. Those parts of 10 CFR Part 60 that require routine guidance or minor changes to the rule were addressed in Hageman and Chowdhury, 1992. The ROC task shows a possible need for further regulatory clarity, by major changes to the rule, related to the design bases and siting of a geologic repository operations area and radiological emergency planning in order to assure defense-in-depth. The analyses, presented in this report, resulted in the development and refinement of regulatory concepts and their supporting rationale for recommendations for potential major changes to 10 CFR Pan 0 regulations

  5. 40 CFR 122.35 - As an operator of a regulated small MS4, may I share the responsibility to implement the minimum...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false As an operator of a regulated small....35 Section 122.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit...

  6. Frequency primary regulation (FPR). Implications of the down stream flow variations. Operation methodology; Regulacion primaria de frecuencia (RPF). Implicancia por las variaciones del caudal aguas abajo. Metodologia de operacion

    Energy Technology Data Exchange (ETDEWEB)

    Morandi, Hector Enrique; Martelli, Jose Francisco [Ente Ejecutivo Presa Embalse Casa de Piedra, Buenos Aires (Argentina)]. E-mail: cdpba@impsat1.com.br

    1998-07-01

    This paper describes the Frequency Primary Regulation - FPR, determining that the operator running of a hydroelectric power plant must observe a set of norms, actions, etc, aiming to reduce as much as possible the environmental impact following the important modifications introduced. The regulation of the water flux downstream is one of the priority imposed to the project of a hydroelectric power plant. The regulation also allows other benefits as follows: the use of potentially or effectively flooded increasing the productive area; the efficient operation of water influx for various uses; the elimination of crop losses due to lack of irrigation water during certain seasons.

  7. Application of microgrids in providing ancillary services to the utility grid

    International Nuclear Information System (INIS)

    Majzoobi, Alireza; Khodaei, Amin

    2017-01-01

    A microgrid optimal scheduling model is developed in this paper to demonstrate microgrid's capability in offering ancillary services to the utility grid. The application of localized ancillary services is of significant importance to grid operators as the growing proliferation of distributed renewable energy resources, mainly solar generation, is causing major technical challenges in supply-load balance. The proposed microgrid optimal scheduling model coordinates the microgrid net load with the aggregated consumers/prosumers net load in its connected distribution feeder to capture both inter-hour and intra-hour net load variations. In particular, net load variations for three various time resolutions are considered, including hourly ramping, 10-min based load following, and 1-min based frequency regulation. Numerical simulations on a test distribution feeder with one microgrid and several consumers/prosumers indicate the effectiveness of the proposed model and the viability of the microgrid application in supporting grid operation. - Highlights: • Microgrid optimal scheduling for providing ancillary services to the utility grid. • Local management and mitigation of distribution net load variations. • Offering various support services: ramping, load following, frequency regulation. • Proven effectiveness and accuracy in capturing net load variations.

  8. Federal radiation protection regulations: An industry viewpoint

    International Nuclear Information System (INIS)

    Harward, E.D.

    1987-01-01

    Regulations and standards to protect the public and workers from ionizing radiation have been in transition for a number of years, although most of the basic limits in use have remained essentially unchanged over the past 25 years or so. Legislation, political changes, new scientific data, advances in scientific concepts, and finally, public perception and resulting pressures have all been factors in the modifications that have been implemented or considered for radiation protection regulations in recent years. During this period, radiation exposures to both the public and the work force have been reduced through program management and improved technology. Based on activities of the AIF Subcommittee on Radiation Protection, this paper reviews pertinent NRC and EPA regulations, standards and guidance as well as NCRP recommendations and provide some analyses of these in terms of their potential effect on nuclear industry operations. Comments include suggestions where minor changes in Federal agency approaches to radiation regulation might be made for the public benefit

  9. Requirements to be met by the operation manual

    International Nuclear Information System (INIS)

    1981-03-01

    The rule applies to the contents and the lay-out of the operating manual for stationary nuclear power plants. The draft contains: 1. General requirement to be met by the contents of the operating manual. The operating manual to be arranged in 4 parts (part 1: internal rules and regulations; part 2: operation overall plant; part 3: incidents; part 4: operation systems). Safety specifications to be included in the manual, the exemption being the system of technical documentation. 2. General requirements to be met by the lay-out of the operating manual. Comprehensibility; legibility; structure and subdivisions; arrangement of the instructions and design of the manuals cover. 3. Requirements to be met by part 1. Defining the various internal rules and regulations (personnel management); rules and regulations concerning inspections and shift work; maintenance and repair; radiation protection; guard duty and admission; alarm; fire protection; first aid. 4. Requirements to be met by part 2. Provisions and operational limitations; limit values important from the point of view of safety; normal operation; anomalous operation; in-service inspections. 6. Requirements to be met by part 3. 7. Annex: Rules, regulations and stipulations mentioned in the rule draft. (orig.)

  10. The regulation of mobile medical applications.

    Science.gov (United States)

    Yetisen, Ali Kemal; Martinez-Hurtado, J L; da Cruz Vasconcellos, Fernando; Simsekler, M C Emre; Akram, Muhammad Safwan; Lowe, Christopher R

    2014-03-07

    The rapidly expanding number of mobile medical applications have the potential to transform the patient-healthcare provider relationship by improving the turnaround time and reducing costs. In September 2013, the U.S. Food and Drug Administration (FDA) issued guidance to regulate these applications and protect consumers by minimising the risks associated with their unintended use. This guidance distinguishes between the subset of mobile medical apps which may be subject to regulation and those that are not. The marketing claims of the application determine the intent. Areas of concern include compliance with regular updates of the operating systems and of the mobile medical apps themselves. In this article, we explain the essence of this FDA guidance by providing examples and evaluating the impact on academia, industry and other key stakeholders, such as patients and clinicians. Our assessment indicates that awareness and incorporation of the guidelines into product development can hasten the commercialisation and market entry process. Furthermore, potential obstacles have been discussed and directions for future development suggested.

  11. Considerations regarding the general rule provided by the article 4 of the Rome II regulation

    Directory of Open Access Journals (Sweden)

    Adrian PRICOPI

    2010-12-01

    Full Text Available This article addresses certain issues related to the enforcement of the Rome II Regulation. The mentioned Regulation was adopted in order to unify, within the European Union, the rules regarding choice of law concerning non-contractual obligations. The application of the Regulation has caused some controversies in jurisprudence, regarding the implications on the national laws and international treaties or conventions. Almost two years after its prescribed date of application, a rigorous analysis of the Regulation’s impact over the case law, both on national and European level is necessary. The purpose of this study is to briefly describe, the research of the two authors regarding the practical effects of the aforementioned Regulation, as well as some judicial problems arisen from its application, mainly relating to the general rule of law, expressed in the fourth Article of the Regulation.

  12. Smart-grid investments, regulation and organization

    International Nuclear Information System (INIS)

    Agrell, Per J.; Bogetoft, Peter; Mikkers, Misja

    2013-01-01

    Grid infrastructure managers worldwide are facing demands for reinvestments in new assets with higher on-grid and off-grid functionality in order to meet new environmental targets. The roles of the current actors will change as the vertical interfaces between regulated and unregulated tasks become blurred. In this paper, we characterize some of the effects of new asset investments policy on the network tasks, assets and costs and contrast this with the assumptions of the current economic network regulation. To provide structure, we present a model of investment provision under regulation between a distribution system operator and a potential investor–generator. The results from the model confirm the hypothesis that network regulation should find a focal point, should integrate externalities in the performance assessment and should avoid wide delegation of contracting-billing for smart-grid investments. - Highlights: ► We review regulatory solutions for smart-grid and DER investments. ► What matters more than upfront incentives is organization and delegation. ► We model regulated investment under private information by a generator or a DSO. ► Highest welfare for high-powered incentives and centralized information. ► Market approaches likely to give poor outcomes for this case.

  13. Regulative environmental policy. Regulative Umweltpolitik

    Energy Technology Data Exchange (ETDEWEB)

    Goerlitz, A; Voigt, R [Universitaet der Bundeswehr Muenchen, Neubiberg (Germany, F.R.). Fakultaet fuer Sozialwissenschaften; eds.

    1991-01-01

    Regulative policy means those governmental attempts to steer the course of things which can fall back on a certain repertoire of instruments for actions in order to warrant the causal and temporal connection between the making available and the employment of means. The fact that environmental protection needs regulative policy is substantiated by the thesis that the market has failed; consequently only government can manage the public goods 'environment' in a suitable way, and it is a matter of fact that environmental protection at present is operated preferably via regulative policy. The problems of regulative enviromental policy are manifold. Its implementation often miscarries because of limited administrative resources on the one hand - making sufficient control impossible for instance -, and because of poor quality regulative instruments on the other hand. One way out would be to increase the efficiency of regulative policy by sophisticating judicial techniques. Other ways out point to the executing level and aim at improving implementation strategies or are concerned with post-regulative law. The latter refers to a new legal quality which demonstrates itself already in corporatistical crisis regulation or in induction programs such as pollution limits. A final way out favours deregulation strategies which includes the introduction of environmental levies or the allocation of environmental licences. An interdisciplinary discourse is to find out what would happen if these ways were taken. Pointers to solutions from varying scientific disciplines resulting from this discourse are to be found in this volume. (orig./HSCH).

  14. Proposed changes for part N of suggested state regulations

    Energy Technology Data Exchange (ETDEWEB)

    Paris, R.

    1997-02-01

    This paper discusses proposed changes for Part N regulations regarding naturally occuring radioactive materials. It describes the work of the Commission on NORM of the Conference of Radiation Control Program Directors (CRCPD), toward adjusting the regulations. A set of questions was formulated and a review panel established to address these questions and come back with recommended actions. The panel recommended the distinction that the material being regulated is `Technologically Enhanced Naturally Occurring Radioactive Material` (TENORM). By this they mean `naturally occurring radioactive material not regulated under the Atomic Energy Act (AEA) whose radionuclide concentrations have been increased by or as a result of human practices.` Recommendations also include: using a dose based instead of concentration based standard; refined definition of exemptions from regulations; exclusion of radon from Total Effective Dose Equivalent (TEDE) calculations; provide states flexibility in implementation; inclusion of prospective remedial and operations aspects for TENORM; provision of institutional controls.

  15. Analysis of expediency to set regulators of high-pressure emergency core cooling system of WWER 1000 (B-320)

    International Nuclear Information System (INIS)

    Skalozubov, V.I.; Komarov, Yu.A.; Tikhonova, G.G.; Nikiforov, S.N.; Bogodist, V.V.; Fol'tov, I.M.; Khadzh Faradzhallakh Dabbakh, A.

    2011-01-01

    The work shows that setting regulative valves in high-pressure emergency core cooling system of WWER 1000/B-320 can be effective only involving the additional tuning to account traverse speed of operating elements of regulator and configuration of the systems providing cooling of primary loop.

  16. Foucault could have been an operating room nurse.

    Science.gov (United States)

    Riley, Robin; Manias, Elizabeth

    2002-08-01

    Operating room nursing is an under-researched area of nursing practice. The stereotypical image of operating room nursing is one of task- and technically-orientated aspects of practice, where nurses work in a medical model and are dominated by constraints from outside their sphere of influence. This paper explores the possibility of understanding operating room nursing in a different way. Using the work of Michel Foucault to analyse the work of operating room nursing, this paper argues the relevance of the framework for a more in-depth analysis of this specialty area of practice. The concepts of power, discipline and subjectivity are used to demonstrate how operating room nursing is constructed as a discipline and how operating room nurses act to govern and construct the specialty. Exemplars are drawn from extensive professional experience, from guidelines of professional operating room nursing associations, as well as published texts. The focus is predominantly on the regulation of space and time to maintain the integrity of the sterile surgical field and issues of management, as well as the use of the ethical concept of the 'surgical conscience'. This form of analysis provides a level and depth of inquiry that has rarely been undertaken in operating room nursing. As such, it has the potential to provide a much needed, different view of operation room nursing that can only help to strengthen its professional foundations and development.

  17. The experiences from implementing decision support technology to address water management plans in an operational environment

    Energy Technology Data Exchange (ETDEWEB)

    McArdle, S. [4DM Inc., Toronto, ON (Canada); Tonkin, C. [Ontario Power Generation Inc., Toronto, ON (Canada)

    2005-07-01

    This presentation described Ontario Power Generation's experience in implementing a decision support tool to enable water management plans for its operations through technology solutions. All hydroelectric producers in Ontario are required to make water management plans in order to maintain water levels and flows in their operating regions. This regulation was created in response to environmental concerns as well as to changes in the electricity market and growth of residential and cottage property near water bodies. In order to keep informed and to address compliance issues, operators and managers need situation awareness information to balance operational decisions. The online Adaptive Water Management System (AWMS) decision support tool was recently adopted by Ontario Power Generation to provide information needed to address the requirements of Water Management Plans. The AWMS provides users with information on water levels and flows; the ability to implement, modify, and manage daily instructions at the facilities; track conditions in the watershed; and, provide a status of compliance. The tool was developed by 4DM Inc. in collaboration with Ottawa St. Lawrence Plant Group for the Madawaska River Watershed Management, a model partnership between operator, regulator and Public Advisory Committee to develop a water management plan.

  18. Operational circular No. 1 (Rev. 1) – Operational circulars

    CERN Multimedia

    HR Department

    2011-01-01

    Operational Circular No. 1 (Rev. 1) is applicable to members of the personnel and other persons concerned. Operational Circular No. 1 (Rev. 1) entitled "Operational circulars", approved following discussion at the Standing Concertation Committee meeting on 4 May 2011, is available on the intranet site of the Human Resources Department: https://hr-docs.web.cern.ch/hr-docs/opcirc/opcirc.asp It cancels and replaces Operational Circular No. 1 entitled "Operational Circulars” of December 1996. This new version clarifies, in particular, that operational circulars do not necessarily arise from the Staff Rules and Regulations, and the functional titles have been updated to bring them into line with the current CERN organigram. Department Head Office  

  19. The Regulation of Street Foods

    DEFF Research Database (Denmark)

    Forkour, John Boulard; Samuelsen, Helle; Yeboah, Eric Henry

    2017-01-01

    the challenges and negotiating strategies of regulators of street-vended foods in Ghana and analyses the implication for their relationship with street food vendors. The paper reveals that regulators operate in a context of limited resources, leading to a general feeling of neglect. In coping, regulators adopt...

  20. Report on gas sales regulated tariffs of historical providers (others than GDF Suez). Analysis of supply costs and of non-supply related costs - May 2015. Deliberation of the Commission for Energy Regulation of the 27 May 2015 bearing approval of the report of analysis of supply and non-supply related costs used as a basis for the calculation of the evolution of natural gas sales regulated tariffs of historical providers

    International Nuclear Information System (INIS)

    Edwige, Catherine; Padova, Yann; Sotura, Jean-Pierre

    2015-05-01

    After a presentation of the context and objectives of works performed by the CRE (the French commission for energy regulation), and a synthetic presentation of the main conclusions, this report first proposes an assessment for 2014 by presenting and discussing the distribution of costs taken into account in regulated tariffs of historic providers, and by noticing that the CRE is able to give its opinion on cost coverage by revenues only for a limited number of providers. The second part proposes an analysis of provider supply conditions and their evolution perspectives. The last part addresses the perspectives of evolution of non-supply related costs

  1. Knowledge and abilities catalog for nuclear power plant operators: Pressurized water reactors. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document provides the basis for the development of content-valid licensing examinations for reactor operators and senior reactor operators. The examinations developed using the PWR catalog will cover those topics listed under Title 10, (ode of Federal Regulations Part 55. The PWR catalog contains approximately 5100 knowledge and ability (K/A) statements for reactor operators and senior reactor operators. The catalog is organized into six major sections: Catalog Organization; Generic Knowledge and Abilities; Plant Systems; Emergency and Abnormal Plant Evolutions; Components and Theory.

  2. Knowledge and abilities catalog for nuclear power plant operators: Pressurized water reactors. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    This document provides the basis for the development of content-valid licensing examinations for reactor operators and senior reactor operators. The examinations developed using the PWR catalog will cover those topics listed under Title 10, (ode of Federal Regulations Part 55. The PWR catalog contains approximately 5100 knowledge and ability (K/A) statements for reactor operators and senior reactor operators. The catalog is organized into six major sections: Catalog Organization; Generic Knowledge and Abilities; Plant Systems; Emergency and Abnormal Plant Evolutions; Components and Theory

  3. On Integrating Unmanned Aircraft Systems into the National Airspace System Issues, Challenges, Operational Restrictions, Certification, and Recommendations

    CERN Document Server

    Dalamagkidis, Konstantinos; Piegl, Les A

    2012-01-01

    This book presents, in a comprehensive way, current unmanned aviation regulation, airworthiness certification, special aircraft categories, pilot certification, federal aviation requirements, operation rules, airspace classes and regulation development models. It discusses unmanned aircraft systems levels of safety derived mathematically based on the corresponding levels for manned aviation. It provides an overview of the history and current status of UAS airworthiness and operational regulation worldwide. Existing regulations have been developed considering the need for a complete regulatory framework for UAS. It focuses on UAS safety assessment and functional requirements, achieved in terms of defining an “Equivalent Level of Safety”, or ELOS, with that of manned aviation, specifying what the ELOS requirement entails for UAS regulations. To accomplish this, the safety performance of manned aviation is first evaluated, followed by a novel model to derive reliability requirements for achieving target lev...

  4. Transients: The regulator's view

    International Nuclear Information System (INIS)

    Sheron, B.W.; Speis, T.P.

    1984-01-01

    This chapter attempts to clarify the basis for the regulator's concerns for transient events. Transients are defined as both anticipated operational occurrences and postulated accidents. Recent operational experience, supplemented by improved probabilistic risk analysis methods, has demonstrated that non-LOCA transient events can be significant contributors to overall risk. Topics considered include lessons learned from events and issues, the regulations governing plant transients, multiple failures, different failure frequencies, operator errors, and public pressure. It is concluded that the formation of Owners Groups and Regulatory Response Groups within the owners groups are positive signs of the industry's concern for safety and responsible dealing with the issues affecting both the US NRC and the industry

  5. Risk-based regulation - an NRC perspective and status

    International Nuclear Information System (INIS)

    King, T.L.; Murphy, J.A.

    1993-01-01

    The consideration of risk in regulatory decision making has traditionally been part of the US Nuclear Regulatory Commission's (NRC's) policy and practice. In the early days of regulation, this consideration was more qualitative in nature and was reflected in prescriptive/deterministic regulatory requirements. However, with the development of quantitative risk assessment methods, more detailed and comprehensive (although not complete) risk information on nuclear power plants is available to the designer, operator, and regulator. The availability of such information provides an opportunity to assess the need for change in the current regulatory structure and to develop future regulatory requirements in a less prescriptive, more performance-oriented fashion

  6. Taxation and regulation of uranium mining in Canada

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Government taxation and regulation have a profound influence on mineral operations. In Canada, taxation occurs both on the federal and provincial levels. In addition, both federal and provincial regulations also affect mine operations, sometimes with overlapping, or conflicting, legislation and jurisdiction. Three broad areas of regulation affect the mine production of uranium in Canada: (1) mining law or mineral rights; (2) the licensing procedures; and (3) regulation of occupational health and safety

  7. Self-regulation in the mining industry

    DEFF Research Database (Denmark)

    Sinding, Knud; Peck, Philip

    2013-01-01

    Many industries have established their own systems for self-regulation. They often do so when companies involved in the industry operate in countries where financial, technical, environmental and social regulation is weak and when the industry is challenged by legitimacy issues related to behaviour...... in one of these areas. One industry that has progressed unevenly down the road of self-regulation in these areas is mining. Developing self-regulation for mines and mining companies involves difficult questions of scope, rules, membership, assessment criteria and performance evaluation. While self-regulation...... may bring benefits to members, they are likely to take a long time coming; but when they do arrive they may be substantial. Using a range of theoretical and empirical results from research on self-regulation, performance rating and corporate strategy, this paper analyses the strategic and operational...

  8. The regulations for delivery of subsidies to radiation monitoring

    International Nuclear Information System (INIS)

    1985-01-01

    The regulations provide for subsidies for equipment and operation of a radiation monitoring facility around a nuclear power generating facility. Subsidies are provided to the prefectures concerned for equipment, etc. required in radiation monitoring, pre-service radiation monitoring and in-service radiation monitoring conducted by a prefecture. The contents are as follows: terms of subsidy allocations, the sum of subsidy allocations, applications for subsidies, decisions on the allocation of subsidies, withdrawal of applications, conditions of the allocations, a report on the work proceedings, a report on the results, confirmation on the sum of the subsidies, withdrawal of the decision for subsidies, limitations for disposal of the properties, payment of the subsidy, accounting of the subsidy operations, and a record on the subsidy. (Kubozono, M.)

  9. The regulations for delivery of subsidies to radiation monitoring

    International Nuclear Information System (INIS)

    1984-01-01

    The regulations provide for subsidies for equipment and operation of a radiation monitoring facility around a nuclear power generating facility. Subsidies are provided to the prefectures concerned for equipment, etc. required in radiation monitoring, pre-service radiation monitoring and in-service radiation monitoring conducted by a prefecture. The contents are as follows: terms of subsidy allocations, the sum of subsidy allocations, applications for subsidies, decisions on the allocation of subsidies, withdrawal of applications, conditions of the allocations, a report on the work proceedings, a report on the results, confirmation on the sum of the subsidies, withdrawal of the decision for subsidies, limitations for disposal of the properties, payment of the subsidy, accounting of the subsidy operations, and a record on the subsidy. (Mori, K.)

  10. Microplastics in the context of regulation of commercial shellfish aquaculture operations.

    Science.gov (United States)

    Schoof, Rosalind A; DeNike, Jesse

    2017-05-01

    Shellfish aquaculture in the Salish Sea (encompassing the Strait of Juan de Fuca, Puget Sound, and the Georgia Strait) is a major source of clams, oysters, and mussels in the United States and Canada. Plastic gear is necessary for the viability of many of these operations. During the past few years, shellfish farm permits issued in Washington State have been challenged on various bases that have included allegations that the plastic gear is releasing microplastics, commonly defined as particles less than 5 mm in diameter. Published survey data on sources of marine plastic debris demonstrate the very limited contribution of aquaculture gear. Both permits and industry codes of practice provide procedures to minimize loss of gear to the marine environment. Plastic gear is also designed specifically to maintain its integrity and not degrade in the marine environment. Plastic degradation is greatest on beaches with high UV exposure, whereas aquaculture gear is mostly underwater and/or covered by biofoulants. Available data for microplastics in water, sediment, and biota of the Salish Sea do not suggest significant release of microplastics from shellfish aquaculture operations. Integr Environ Assess Manag 2017;13:522-527. © 2017 SETAC. © 2017 SETAC.

  11. One firm to many: The Demise of the monopoly argument for energy providers

    International Nuclear Information System (INIS)

    Cale Case, J.; Ciolek, M.G.

    1992-01-01

    The traditional model of utility regulation begins with the notion of 'Natural' Monopoly. Under the 'Natural' monopoly argument, a sole supplier can most efficiently provide service in certain markets. Electricity and natural gas supply has traditionally been associated with natural monopoly. The traditional approach has led to a proliferation of single firm providers operating under laws and customs which restrict entry by other potential suppliers. In most of the world the result has been one state-owned provider. The actual history of the energy industry in U.S.A. does not support the notion of the pervasive efficiencies of a sole supplier. Most regulated industries experienced a sustained period of competition in their formative stage. In fact, the competitive forces stemming from the availability of multiple suppliers provided customers with cheaper and better service. Frequently, competition ended, due not to the winning of the market by a single provider who enjoyed overwhelming scale economies, but rather, competition ceased because industry leaders successfully petitioned for the protection of profits by government. The paper begins by considering the physical and organizational structure of the electric and gas industries. Next the early development of the industries is discussed with special emphasis on the competitive conditions which existed in the United States prior to the advent of regulation and the restrictions on entry which ended the competitive era. Contemporary rediscovery of the benefits of competitive supply in the industries is addressed in the next section. Finally, the paper examines the areas in which contemporary competitive initiatives have fallen short

  12. Rule Optimization monthly reservoir operation Salvajina

    International Nuclear Information System (INIS)

    Sandoval Garcia, Maria Clemencia; Santacruz Salazar, Santiago; Ramirez Callejas, Carlos A

    2007-01-01

    In the present study a model was designed for the optimization of the rule for monthly operation of the Salvajina dam (Colombia) based in the technology) of dynamic programming. The model maximizes the benefits for electric power generation, ensuring at the same time flood regulation in winter and pollution relief during the summer. For the optimization of the rule of operation, it was necessary to define the levels and volumes of reserve and holding required for the control of flood zones in the Cauca river and to provide an effluent minimal flow and assure a daily flow at the Juanchito station (located 141 km downstream from the dam) of the Cauca river, 90 % of the time during the most critical summer periods.

  13. Advances in the operational safety of nuclear power plants. Proceedings of an international symposium

    International Nuclear Information System (INIS)

    1996-01-01

    The main purpose of the Conference was to provide a forum for exchange of information among around 200 attending experts from 46 Member States and five international organizations, who altogether presented around 80 papers and posters. The Conference presentations were divided into four main topics: Managing and Regulating Safe Operation; Safety Performance and Lessons Learned; Improving Operational Safety Using PSA; Enhancing Safety. Refs, figs, tabs

  14. Regulate or deregulate. Influencing network interconnection charges

    Energy Technology Data Exchange (ETDEWEB)

    Van De Wielle, B.

    2003-06-01

    We study the choice between regulating interconnection charges or delegating their determination to the operators, both in a non-mature and a mature market. Three regulatory regimes are considered: full, cost-based and bill-and-keep. Delegation corresponds to bargaining about the interconnection charges using the regulatory schemes as disagreement outcomes. Applying regulation benefits the consumers. Under full regulation, access charges account for asymmetries and allow a unique Ramsey price. Delegation benefits the operators. In a mature market delegation robs the government of any market influence. In a non-mature market government preferences coincide with those of the largest operator and are disadvantageous for entry.

  15. 31 CFR 337.0 - Scope of regulations.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Scope of regulations. 337.0 Section 337.0 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE... Public Debt Accounting operates the FHA debenture computer system and performs the day-to-day operations...

  16. Definitional Issues in Emotion Regulation Research

    Science.gov (United States)

    Bridges, Lisa J.; Denham, Susanne A.; Ganiban, Jody M.

    2004-01-01

    Operational definitions of emotion regulation are frequently unclear, as are links between emotion regulation measures and underlying theoretical constructs. This is of concern because measurement decisions can have both intentional and unintentional implications for underlying conceptualizations of emotion regulation. This report examines the…

  17. Risk based economic optimization of investment decisions of regulated power distribution system operators; Risikobasierte wirtschaftliche Optimierung von Investitionsentscheidungen regulierter Stromnetzbetreiber

    Energy Technology Data Exchange (ETDEWEB)

    John, Oliver

    2012-07-01

    The author of the contribution under consideration reports on risk-based economic optimization of investment decisions of regulated power distribution system operators. The focus is the economically rational decision behavior of operators under certain regulatory requirements. Investments in power distribution systems form the items subject to decisions. Starting from a description of theoretical and practical regulatory approaches, their financial implications are quantified at first. On this basis, optimization strategies are derived with respect to the investment behavior. For this purpose, an optimization algorithm is developed and applied to exemplary companies. Finally, effects of uncertainties in regulatory systems are investigated. In this context, Monte Carlo simulations are used in conjunction with real options analysis.

  18. Planned and proposed pipeline regulations

    International Nuclear Information System (INIS)

    De Leon, C.

    1992-01-01

    The Research and Special Programs Administration administers the Natural Gas Pipeline Safety Act of 1968 (NGPSA) and the Hazardous Liquid Pipeline Safety Act of 1979 (HLPSA). The RSPA issues and enforces design, construction, operation and maintenance regulations for natural gas pipelines and hazardous liquid pipelines. This paper discusses a number of proposed and pending safety regulations and legislative initiatives currently being considered by the RSPA and the US Congress. Some new regulations have been enacted. The next few years will see a great deal of regulatory activity regarding natural gas and hazardous liquid pipelines, much of it resulting from legislative requirements. The office of Pipeline Safety is currently conducting a study to streamline its operations. This study is analyzing the office's business, social and technical operations with the goal of improving overall efficiency, effectiveness, productivity and job satisfaction to meet the challenges of the future

  19. 78 FR 19949 - The $500,000 Deduction Limitation for Remuneration Provided by Certain Health Insurance Providers

    Science.gov (United States)

    2013-04-02

    ... 26 CFR Part 1 The $500,000 Deduction Limitation for Remuneration Provided by Certain Health Insurance... limitation for remuneration provided by certain health insurance providers under section 162(m)(6) of the Internal Revenue Code (Code). These regulations affect health insurance providers that pay such...

  20. The use of flow models for design of plant operating procedures

    International Nuclear Information System (INIS)

    Lind, M.

    1982-03-01

    The report describe a systematic approach to the design of operating procedures or sequence automatics for process plant control. It is shown how flow models representing the topology of mass and energy flows on different levels of function provide plant information which is important for the considered design problem. The modelling methodology leads to the definition of three categories of control tasks. Two tasks relate to the regulation and control of changes of levels and flows of mass and energy in a system within a defined mode of operation. The third type relate to the control actions necessary for switching operations involved in changes of operating mode. These control tasks are identified for a given plant as part of the flow modelling activity. It is discussed how the flow model deal with the problem of assigning control task precedence in time eg. during start-up or shut-down operations. The method may be a basis for providing automated procedure support to the operator in unforeseen situations or may be a tool for control design. (auth.)

  1. Risk-informed regulation

    International Nuclear Information System (INIS)

    Hoffman, D.R.

    2003-01-01

    In assessing safety for nuclear facilities, regulators have traditionally used a deterministic approach. New techniques for assessing nuclear or radiological risks make it possible for regulators to incorporate risk insights into their regulations. By 'risk-informing' the regulatory processes, independent bodies tasked with protecting the health and safety of the public can focus on those design and operational issues most important to safety. Such an approach is a move away from prescriptive regulations that were based on conservative engineering judgments toward regulations focused on issues that contribute significantly to safety. Despite the availability of probabilistic risk assessment (PRA) tools, organisations often struggle with how to best use this capability. Most international regulations are still based largely on deterministic analyses that were developed without the benefit of quantitative or measurable estimates of risk. PRA considers issues of risk in a more comprehensive manner by examining a wider spectrum of initiating events and their frequency, and considers the likelihood of events in a rigorous and comprehensive manner. In some countries, nuclear regulators are actively moving toward increasing the use of risk insights in a variety of strategic arenas, including risk-informed technical specifications (operating limits and conditions), in-service inspection and testing, programs, and assessment and enforcement actions. A risk-informed approach enhances the traditional deterministic approach by explicitly considering a broader range of safety challenges, focusing resources on the basis of risk significance, considering a broader range of counter measures to mitigate challenges, and explicitly identifying and quantifying uncertainties in analyses. (author)

  2. Wind integration in self-regulating electric load distributions

    Energy Technology Data Exchange (ETDEWEB)

    Parkinson, Simon; Wang, Dan; Crawford, Curran; Djilali, Ned [University of Victoria, Department of Mechanical Engineering, Institute for Integrated Energy Systems, STN CSC, Victoria, BC (Canada)

    2012-12-15

    The purpose of this paper is to introduce and assess an alternative method of mitigating short-term wind energy production variability through the control of electric loads. In particular, co-located populations of electric vehicles and heat pumps are targeted to provide regulation-based ancillary services, as the inherent operational flexibility and autonomous device-level control strategy associated with these load-types provide an ideal platform to mitigate enhanced variability within the power system. An optimal control strategy capable of simultaneously balancing these grid-side objectives with those typically expected on the demand-side is introduced. End-use digital communication hardware is used to track and control population dynamics through the development of online aggregate load models equivalent to conventional dispatchable generation. The viability of the proposed load control strategy is assessed through model-based simulations that explicitly track end-use functionality of responsive devices within a power systems analysis typically implemented to observe the effects of integrated wind energy systems. Results indicate that there is great potential for the proposed method to displace the need for increased online regulation reserve capacity in systems considering a high penetration of wind energy, thereby allowing conventional generation to operate more efficiently. (orig.)

  3. Environmental safety providing during heat insulation works and using thermal insulation materials

    Directory of Open Access Journals (Sweden)

    Velichko Evgeny

    2017-01-01

    Full Text Available This article considers the negative effect of thermal insulating materials and products on human health and environment pollution, particularly in terms of the composition of environmentally hazardous construction products. The authors have analyzed the complex measures for providing ecological safety, sanitary and epidemiological requirements, rules and regulations both during thermal insulation works and throughout the following operation of buildings and premises. The article suggests the protective and preventive measures to reduce and eliminate the negative impact of the proceeding of thermal insulation works on the natural environment and on human health.

  4. Commission for Energy regulation (CRE) - Activity report June 2005; Commission de regulation de l'energie (CRE) - Rapport d'activite juin 2005

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    CRE is the French commission for energy regulation. CRE's remit is to assist in ensuring the proper operation of the electricity and natural gas markets for the benefit of the end-user. In particular, CRE ensures that the conditions of access to electricity and natural gas transmission and distribution systems do not hinder the development of competition. It monitors, for the electricity and natural gas sectors, all transactions made between suppliers, traders and producers, all transactions made on the organised markets and cross-border trading. It ensures that suppliers, traders and producers propose offers that are consistent with their financial and technical constraints. It monitors the implementation of and compliance with regulations giving consumers the right to choose their supplier in a competitive market, and allowing new suppliers to enter the market. This document is the 2005 activity report of CRE. Content: A - The opening of the markets in France and in Europe: The opening of the markets one year after 1 July 2004 (An especially important step, Electricity and gas: a common framework with structural differences, The coexistence of market prices and regulated tariffs); The European texts of 26 June 2003 (Texts to give new impetus, Texts to harmonize the role and powers of national regulators, Texts to guarantee the independence of system operators, Texts to ensure transparent and non-discriminatory access to networks, Texts providing for strengthening of interconnections); The outlook for 2007, a fully open market (1 July 2007: a date set by the directives, Priority given to informing and protecting consumers); B - Regulation of the natural gas market: The gas market in the European context (Europe's dependency on imports is increasing, Gas prices increased considerably across the whole of Europe in 2004, The European gas scene continues to be dominated by a small number of players, Gas infrastructures need to be developed in Europe, The new

  5. 78 FR 18479 - Drawbridge Operation Regulations; Pass Manchac, LA

    Science.gov (United States)

    2013-03-27

    ... governing the operation of the Canadian National (CN) Railroad automated bascule span drawbridge across Pass....gov . Type the docket number in the ``SEARCH'' box and click ``SEARCH.'' Click on Open Docket Folder... Operations, telephone 202-366-9826. SUPPLEMENTARY INFORMATION: The CN Railroad has requested a temporary...

  6. The structure of arabidopsis thaliana OST1 provides insights into the kinase regulation mechanism in response to osmotic stress

    KAUST Repository

    Yunta, Cristina; Martí nez-Ripoll, Martí n; Zhu, Jian-Kang; Albert, Armando

    2011-01-01

    SnRK [SNF1 (sucrose non-fermenting-1)-related protein kinase] 2.6 [open stomata 1 (OST1)] is well characterized at molecular and physiological levels to control stomata closure in response to water-deficit stress. OST1 is a member of a family of 10 protein kinases from Arabidopsis thaliana (SnRK2) that integrates abscisic acid (ABA)-dependent and ABA-independent signals to coordinate the cell response to osmotic stress. A subgroup of protein phosphatases type 2C binds OST1 and keeps the kinase dephosphorylated and inactive. Activation of OST1 relies on the ABA-dependent inhibition of the protein phosphatases type 2C and the subsequent self-phosphorylation of the kinase. The OST1 ABA-independent activation depends on a short sequence motif that is conserved among all the members of the SnRK2 family. However, little is known about the molecular mechanism underlying this regulation. The crystallographic structure of OST1 shows that ABA-independent regulation motif stabilizes the conformation of the kinase catalytically essential α C helix, and it provides the basis of the ABA-independent regulation mechanism for the SnRK2 family of protein kinases. © 2011 Elsevier Ltd. All rights reserved.

  7. The structure of arabidopsis thaliana OST1 provides insights into the kinase regulation mechanism in response to osmotic stress

    KAUST Repository

    Yunta, Cristina

    2011-11-01

    SnRK [SNF1 (sucrose non-fermenting-1)-related protein kinase] 2.6 [open stomata 1 (OST1)] is well characterized at molecular and physiological levels to control stomata closure in response to water-deficit stress. OST1 is a member of a family of 10 protein kinases from Arabidopsis thaliana (SnRK2) that integrates abscisic acid (ABA)-dependent and ABA-independent signals to coordinate the cell response to osmotic stress. A subgroup of protein phosphatases type 2C binds OST1 and keeps the kinase dephosphorylated and inactive. Activation of OST1 relies on the ABA-dependent inhibition of the protein phosphatases type 2C and the subsequent self-phosphorylation of the kinase. The OST1 ABA-independent activation depends on a short sequence motif that is conserved among all the members of the SnRK2 family. However, little is known about the molecular mechanism underlying this regulation. The crystallographic structure of OST1 shows that ABA-independent regulation motif stabilizes the conformation of the kinase catalytically essential α C helix, and it provides the basis of the ABA-independent regulation mechanism for the SnRK2 family of protein kinases. © 2011 Elsevier Ltd. All rights reserved.

  8. 7 CFR 43.105 - Operating characteristics (OC) curves.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Operating characteristics (OC) curves. 43.105 Section 43.105 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE... CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.105 Operating characteristics (OC...

  9. Operational safety of geological disposal: IRSN project 'EXREV' for developing a safety assessment strategy for the operation and reversibility of a geological repository

    International Nuclear Information System (INIS)

    Tichauer, M.; Pellegrini, D.; Serres, C.; Besnus, F.

    2014-01-01

    A high-level waste geological disposal facility is envisioned by the legislator in the French Planning Act no. 2006-739 of 28 June 2006. This act sets major milestones for the operator (Andra) in 2013 (public debate), 2015 (licensing) and 2025 (operation). In the framework of the regulatory review process, IRSN's mission is to conduct an assessment of the safety case provided by Andra at every stage of the process for the French regulator, namely the Nuclear Safety Authority (ASN). In 2005, IRSN gathered more than twenty years of research and expertise in order to provide a comprehensive appraisal of the 'Dossier 2005' prepared by Andra, related to the feasibility of a geological disposal in the Callovo-Oxfordian clay formation. At this time, the description of the operational phase was only at a preliminary stage, but this step paved the way for developing an assessment strategy of the operational phase. In this perspective, IRSN set up the EXREV project in 2008 in order to build up a doctrine and to identify key safety issues to be dealt with. (authors)

  10. Economic regulation of ambulance services in California.

    Science.gov (United States)

    Narad, R A

    1997-01-01

    This study was intended to identify economic regulatory programs used by California counties (including ambulance franchising and rate setting), to inventory their foci and application, and to identify differences around the state. By studying the variety of programs used in one state, this study establishes a framework for evaluation of state and local regulatory programs elsewhere. This study surveyed all California local EMS agencies (LEMSAs); these are California's equivalent of regional EMS organizations. The survey achieved a 100% response rate, and all data involve population parameters obviating the need for inferential statistics. Seventy-three percent of California counties use economic regulations. Large-population counties and those that operate their own LEMSAs are more likely to use economic regulations than are small counties and those that participate in multicounty EMS agencies. Despite a preference for competition in the authorizing statute, most franchises were granted without competition to existing providers. The majority of franchises in the state were granted to public services. Most ambulance rate setting occurs outside of a competitive process. Economic regulations that were intended to provide a structured marketplace are often being used to protect existing providers, particularly public services, from competition. The growing interest by fire departments in entering the market for emergency ambulance service, along with the existing bias toward them in granting of franchises, does not bode well for use of the competitive process. The growth of managed care may change or eliminate the need for economic regulations but, if they are to continue, more state oversight should be considered.

  11. THE PROBLEM OF LEGAL REGULATION OF THE OPERATION OF THE OVER-THE-COUNTER (OTC CURRENCY MARKET (FOREX IN UKRAINE AND THE EU

    Directory of Open Access Journals (Sweden)

    Eugene Podorozhnyi

    2017-12-01

    Full Text Available The aim of the article is to evaluate the state of legal institutionalization of the OTC foreign exchange market in Ukraine, as well as its comparison with the foreign experience of legal regulation of OTC currency relations in Ukraine and EU countries. The subject of the study is the legal and administrative framework for the functioning of the OTC currency market (Forex in Ukraine and in the EU countries. The methodology of the study consists of: historical and legal method, which allowed determining the preconditions for the emergence of OTC markets in Ukraine and the world and the principles of their functioning; system and structural method, which was used to analyse the world monetary system as an institutional and functional form of organization of international monetary and financial relations; a formal legal method that allowed us to comprehensively investigate a condition of regulation of the functioning of Forex in Ukraine, to identify its shortcomings, gaps, contradictions, and miscalculations, as well as to develop recommendations aimed at their elimination; a comparative and legal method that provided a deeper study of the specifics of the legal regulation of the functioning of Forex in the EU and to define ways of implementing a positive foreign experience in the national legal system. The results of the conducted legal study have shown that in Ukraine, the Forex market operates in legal vacuum conditions that negatively affect either the protection of the rights of forex clients or the amount of tax revenues to the state budget. The most acceptable way to eliminate this shortcoming is to implement the main principles and requirements of the MiFID in the national legislation. Practical impact. The research of experience of EU countries regarding the legal regulation of Forex companies activity and also regarding the creation of legal bases for implementation by the specified companies of self-regulation – it is a necessary

  12. Regulation on trading of irradiated food in Latin America

    Energy Technology Data Exchange (ETDEWEB)

    Mastro, N.L. Del [IPEN-CNEN/ SP, Travessa R. No. 400, Cidade Universitaria 05508-900 SP, Caixa Postal 11049, Cep 05422-970, Sao Paulo (Brazil)

    1997-12-31

    The International Consultative Group on food Irradiation (ICGFI) was established in 1984 under the aegis of FAO, IAEA and WHO, following the adoption by the Codex Alimentarius Commission of the Codex General Standard for Irradiated foods and the Recommended International Code of Practice for the Operation of radiation Facilities for the treatment of food. Today, several countries from South America and the Caribbean have regular representatives in the ICGFI. Some of the countries also have regulations about food irradiation: Argentina, Brazil, Chile, Costa Rica, Cuba, Mexico, Peru and Uruguay. After a meeting in Peru in April 1997, Latin American countries agreed to attempt a harmonization of national laws according to an approved regional model regulation on irradiated food. The model legislation is based on the principles of the Codex General Standard for Irradiated Foods and Recommended Code of Practice for the Operation of Radiation Facilities Used for the Treatment of Foods, as well as on the relevant recommendations of the ICGFI. The model regulation establishes the authority, objectives, scope, definitions, general requirements, facilities, control procedures, documentation inspection, labeling and also provides and advisory technological dose limit by classes of food. (Author)

  13. Regulation on trading of irradiated food in Latin America

    International Nuclear Information System (INIS)

    Mastro, N.L. Del

    1997-01-01

    The International Consultative Group on food Irradiation (ICGFI) was established in 1984 under the aegis of FAO, IAEA and WHO, following the adoption by the Codex Alimentarius Commission of the Codex General Standard for Irradiated foods and the Recommended International Code of Practice for the Operation of radiation Facilities for the treatment of food. Today, several countries from South America and the Caribbean have regular representatives in the ICGFI. Some of the countries also have regulations about food irradiation: Argentina, Brazil, Chile, Costa Rica, Cuba, Mexico, Peru and Uruguay. After a meeting in Peru in April 1997, Latin American countries agreed to attempt a harmonization of national laws according to an approved regional model regulation on irradiated food. The model legislation is based on the principles of the Codex General Standard for Irradiated Foods and Recommended Code of Practice for the Operation of Radiation Facilities Used for the Treatment of Foods, as well as on the relevant recommendations of the ICGFI. The model regulation establishes the authority, objectives, scope, definitions, general requirements, facilities, control procedures, documentation inspection, labeling and also provides and advisory technological dose limit by classes of food. (Author)

  14. NVENTIONS IN THE NANOTECHNOLOGICAL AREA PROVIDE INCREASED RESISTANCE OF CONSTRUCTION MATERIALS AND PRODUCTS TO OPERATIONAL LOAD

    Directory of Open Access Journals (Sweden)

    VLASOV Vladimir Alexeevich

    2013-12-01

    Full Text Available The invention «Dispersion of Carbon Nanotubes (RU 2494961» can be used in production of modifying additives for construction materials. Dispersion of carbon nanotubes contains, mass %: carbon nanotubes 1–20; surface active agent – sodium chloride of sulfonated derived naphthalene 1–20; fumed silica 5–15; water – the rest. Dispersion can additionally contain ethylene glycol as antifreeze. Dispersion is steady in storage, it is soluble in water, provides increased strength of construction materials. Invention «Building Structures Reinforcement Composition (RU 2493337» can beused in construction to reinforce concrete, brick and masonry structures. Composition contains glass or basalt roving taken in quantity 90÷100 parts by weight, soaked in polymer binder based on epoxy taken in quantity 0,001÷1,5 parts by weight. This invention provides high resistance to operational load.

  15. Development of a safety and regulation systems simulation program II

    International Nuclear Information System (INIS)

    1985-05-01

    This report describes the development of a safety and regulation systems simulation program under contract to the Atomic Energy Control Board of Canada. A systems logic interaction simulation (SLISIM) program was developed for the AECB's HP-1000 computer which operates in the interactive simulation (INSIM) program environment. The SLISIM program simulates the spatial neutron dynamics, the regulation of the reactor power and in this version the CANDU-PHW 600 MW(e) computerized shutdown systems' trip parameters. The modular concept and interactive capability of the INSIM environment provides the user with considerable flexibility of the setup and control of the simulation

  16. Benefit using reasonable regulations in USA, how to skill up on professional engineers, apply international code, standard, and regulation

    International Nuclear Information System (INIS)

    Turner, S.L.; Morokuzu, Muneo; Amano, Osamu

    2005-01-01

    The reasonable regulations in USA consist of a graduated approach and a risk informed approach (RIA). RIA rationalizes the regulations on the basis of data of operations etc. PSA (Probabilistic Safety Assessment), a general method of RIA, is explained in detail. The benefits of nuclear power plant using RIA are increase of the rate of operation, visualization of risk, application of design standard and design, cost down of nuclear fuel cycle, waste, production and operation, and safety. RIA is supported by the field data, code, standard, regulation and professional engineers. The effects of introduction of RIA are explained. In order to introduce RIA in Japan, all the parties concerned such as the regulation authorities, the electric power industries, makers, universities, have to understand it and work together. A part of scientific society is stated. (S.Y.)

  17. Pacing and awareness: brain regulation of physical activity.

    Science.gov (United States)

    Edwards, A M; Polman, R C J

    2013-11-01

    The aim of this current opinion article is to provide a contemporary perspective on the role of brain regulatory control of paced performances in response to exercise challenges. There has been considerable recent conjecture as to the role of the brain during exercise, and it is now broadly accepted that fatigue does not occur without brain involvement and that all voluntary activity is likely to be paced at some level by the brain according to individualised priorities and knowledge of personal capabilities. This article examines the role of pacing in managing and distributing effort to successfully accomplish physical tasks, while extending existing theories on the role of the brain as a central controller of performance. The opinion proposed in this article is that a central regulator operates to control exercise performance but achieves this without the requirement of an intelligent central governor located in the subconscious brain. It seems likely that brain regulation operates at different levels of awareness, such that minor homeostatic challenges are addressed automatically without conscious awareness, while larger metabolic disturbances attract conscious awareness and evoke a behavioural response. This supports the view that the brain regulates exercise performance but that the interpretation of the mechanisms underlying this effect have not yet been fully elucidated.

  18. Statutory Instruments No 144 of 1994. European Communities (Protection of outside workers from ionising radiation) Regulations, 1994

    International Nuclear Information System (INIS)

    1994-04-01

    These Regulations implement Council Directive 90/641 EURATOM of 4 December, 1990 on the operational protection of outside workers exposed to the risk of ionising radiation during their activities in controlled areas. The Regulations provide for the radiation protection of workers liable to receive an exposure of high radiation levels while working away from their employers' premises. The Regulations also apply to workers who come from, or who go to work in, another Member State of the European Community

  19. A new Brazilian regulation for the security of nuclear material and nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    Tavares, Renato L.A.; Filho, Josélio S.M.; Torres, Luiz F.B.; Lima, Alexandre R., E-mail: renato.tavares@cnen.gov.br, E-mail: joselio@cnen.gov.br, E-mail: ltorres@cnen.gov.br, E-mail: alexandre.lima@cnen.gov.br [Comissao Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil). Diretoria de Radioproteção e Segurança Nuclear; Lima, Fabiano P.C., E-mail: fabianopetruceli@outlook.com [Presidência da República, Brasilia, DF (Brazil). Gabinete de Segurança Institucional

    2017-07-01

    The present paper aims to outline the challenges related to the elaboration and concepts involved in a regulatory transition from a purely prescriptive approach to a combined approach that mixes performance-based concepts and evaluation metrics based on statistical data of equipment and personnel. This methodology might represent an improvement compared to a purely prescriptive approach, in which the regulatory authority defines the measures to be taken by operators of nuclear facilities to prevent theft, sabotage events, and mitigate their consequences. The prescriptive approach, despite having the advantages of clarity in the definition of requirements, simplicity in regulatory terms (inspections to verify compliance), and homogeneity in relation to various facilities, does not allow a clear and effective performance measurement, may provide insufficient or excessive security measures (with excessive expenditure of material and human resources), and the possibility of providing a false sense of security. It is known that, in many countries, the state-sponsored nuclear security regime mixes elements of the two mentioned approaches, prescriptive and based on performance, which is not Brazilian practice nowadays. Such methodological developments happened globally due to the increase of threat level for nuclear facilities and materials. The currently regulation in force is CNEN-NE 2.01, which provides a set of measures intended to implement Physical Protection Systems in Nuclear, Radiological Facilities as well as Transport Operations, and all documents related to security of such issues. The new regulation, named CNEN-NN 2.01, will focus only on Nuclear Material and Facilities (two other regulations specific for Security of Radioactive Sources and Transport Operations are under elaboration process). CNEN NN 2.01 is intended to provide further adherence to new international recommendations, e.g, IAEA INFCIRC 225 Rev.5 (NSS 13), which is currently regarded as the

  20. A new Brazilian regulation for the security of nuclear material and nuclear facilities

    International Nuclear Information System (INIS)

    Tavares, Renato L.A.; Filho, Josélio S.M.; Torres, Luiz F.B.; Lima, Alexandre R.; Lima, Fabiano P.C.

    2017-01-01

    The present paper aims to outline the challenges related to the elaboration and concepts involved in a regulatory transition from a purely prescriptive approach to a combined approach that mixes performance-based concepts and evaluation metrics based on statistical data of equipment and personnel. This methodology might represent an improvement compared to a purely prescriptive approach, in which the regulatory authority defines the measures to be taken by operators of nuclear facilities to prevent theft, sabotage events, and mitigate their consequences. The prescriptive approach, despite having the advantages of clarity in the definition of requirements, simplicity in regulatory terms (inspections to verify compliance), and homogeneity in relation to various facilities, does not allow a clear and effective performance measurement, may provide insufficient or excessive security measures (with excessive expenditure of material and human resources), and the possibility of providing a false sense of security. It is known that, in many countries, the state-sponsored nuclear security regime mixes elements of the two mentioned approaches, prescriptive and based on performance, which is not Brazilian practice nowadays. Such methodological developments happened globally due to the increase of threat level for nuclear facilities and materials. The currently regulation in force is CNEN-NE 2.01, which provides a set of measures intended to implement Physical Protection Systems in Nuclear, Radiological Facilities as well as Transport Operations, and all documents related to security of such issues. The new regulation, named CNEN-NN 2.01, will focus only on Nuclear Material and Facilities (two other regulations specific for Security of Radioactive Sources and Transport Operations are under elaboration process). CNEN NN 2.01 is intended to provide further adherence to new international recommendations, e.g, IAEA INFCIRC 225 Rev.5 (NSS 13), which is currently regarded as the

  1. Chapter 6. Operation of electrolytic cell in standard operating practices

    International Nuclear Information System (INIS)

    Yanko, E.A.; Kabirov, Sh.O.; Safiev, Kh.; Azizov, B.S.; Mirpochaev, Kh.A.

    2011-01-01

    This chapter is devoted to operation of electrolytic cell in standard operating practices. Therefore, the electrolyte temperature, the composition of electrolyte, including the level of metals was considered. The regulation of electrolyte composition by liquidus temperature and electrolyte overheating was studied. Damping of anode effects was studied as well. Maintenance of electrolytic cells was described. Heat and energy balances of aluminium electrolytic cells were considered.

  2. Radiation Safety (General) Regulations 1983 (Western Australia)

    International Nuclear Information System (INIS)

    1983-01-01

    The provisions of the Regulations cover, inter alia, the general precautions and requirements relating to radiation safety of the public and radiation workers and registration of irradiating apparatus or premises on which such apparatus is operated. In addition, the Regulations set forth requirements for the operation of such apparatus and for the premises involved. (NEA) [fr

  3. Can re-regulation reservoirs and batteries cost-effectively mitigate sub-daily hydropeaking?

    Science.gov (United States)

    Haas, J.; Nowak, W.; Anindito, Y.; Olivares, M. A.

    2017-12-01

    To compensate for mismatches between generation and load, hydropower plants frequently operate in strong hydropeaking schemes, which is harmful to the downstream ecosystem. Furthermore, new power market structures and variable renewable systems may exacerbate this behavior. Ecological constraints (minimum flows, maximum ramps) are frequently used to mitigate hydropeaking, but these stand in direct tradeoff with the operational flexibility required for integrating renewable technologies. Fortunately, there are also physical methods (i.e. re-regulation reservoirs and batteries) but to date, there are no studies about their cost-effectiveness for hydropeaking mitigation. This study aims to fill that gap. For this, we formulate an hourly mixed-integer linear optimization model to plan the weekly operation of a hydro-thermal-renewable power system from southern Chile. The opportunity cost of water (needed for this weekly scheduling) is obtained from a mid-term programming solved with dynamic programming. We compare the current (unconstrained) hydropower operation with an ecologically constrained operation. The resulting cost increase is then contrasted with the annual payments necessary for the physical hydropeaking mitigation options. For highly constrained operations, both re-regulation reservoirs and batteries show to be economically attractive for hydropeaking mitigation. For intermediate constrained scenarios, re-regulation reservoirs are still economic, whereas batteries can be a viable solution only if they become cheaper in future. Given current cost projections, their break-even point (for hydropeaking mitigation) is expected within the next ten years. Finally, less stringent hydropeaking constraints do not justify physical mitigation measures, as the necessary flexibility can be provided by other power plants of the system.

  4. 77 FR 44525 - Drawbridge Operation Regulation; Apalachicola River, FL

    Science.gov (United States)

    2012-07-30

    ... out of service and has an embargo to cease train operations for Port St. Joe and north of the Apalachicola River due to the absence of shipments coming in/out of Port St. Joe. While the embargo remains in... applied for and received an embargo for the suspension of train traffic on the line, the operation of the...

  5. Improving nuclear regulation. Compilation of Nea regulatory guidance booklets

    International Nuclear Information System (INIS)

    2009-01-01

    A common theme throughout the series of NEA regulatory guidance reports, or 'green booklets', is the premise that the fundamental objective of all nuclear safety regulatory bodies is to ensure that nuclear facilities are operated at all times and later decommissioned in an acceptably safe manner. In meeting this objective the regulator must keep in mind that it is the operator that has responsibility for safely operating a nuclear facility; the role of the regulator is to oversee the operator's activities as related to assuming that responsibility. For the first time, the full series of these reports have been brought together in one edition. As such, it is intended to serve as a knowledge management tool both for current regulators and the younger generation of nuclear experts entering the regulatory field. While the audience for this publication is primarily nuclear regulators, the information and ideas may also be of interest to nuclear operators, other nuclear industry organisations and the general public. (author)

  6. Is self-regulation possible

    International Nuclear Information System (INIS)

    Barkenbus, J.N.

    1983-01-01

    The Nuclear Regulatory Commission's increasingly prescriptive regulation of the nuclear industry can have deleterious effects, perhaps the most serious being the shift in responsibility for safety from the utility to the NRC. Several factors account for this type of regulation including the nature and structure of the nuclear industry, public opinion and bureaucratic incentives, and the nature of the technology itself. The opportunities to create heightened industry self-regulation (performance-based regulation) deserve further examination. The key to self-regulation is to structure incentives so that it is clearly within the nuclear utilities' interests to build and operate nuclear power facilities in the safest manner possible. 27 references

  7. Regulations concerning the fabricating business of nuclear fuel materials

    International Nuclear Information System (INIS)

    1978-01-01

    The Regulation is revised on the basis of ''The law for the regulations of nuclear source materials, nuclear fuel materials and reactors'' and the ''Provisions concerning the enterprises processing nuclear fuel materials'' in the Enforcement Ordinance for the Law, to enforce such provisions. This is the complete revision of the regulation of the same name in 1957. Terms are explained, such as exposure radiation dose, cumulative dose, control area, surrounding inspection area, persons engaged in works, radioactive wastes, area for incoming and outgoing of materials, fluctuation of stocks, batch, real stocks, effective value and main measuring points. For the applications for the permission of the enterprises processing nuclear fuel materials, the location of an enterprise, the construction of buildings and the construction of and the equipments for facilities of chemical processing, forming, coating, assembling, storage of nuclear fuel materials, disposal of radioactive wastes and radiation control must be written. Records shall be made and maintained for the periods specified on the inspection of processing facilities, nuclear fuel materials, radiation control, operation, maintainance, accidents of processing facilities and weather. Limit to entrance into the control area, measures for exposure radiation dose, patrol and inspection, operation of processing facilities, transport of materials, disposal of radioactive wastes, safety regulations are provided for. Reports to be filed by the persons engaging in the enterprises processing nuclear fuel materials are prescribed. (Okada, K.)

  8. Application of United States Department of Transportation regulations to hazardous material and waste shipments on the Hanford site

    International Nuclear Information System (INIS)

    Burnside, M.E.

    1992-01-01

    All hazardous material and waste transported over roadways open to the public must be in compliance with the U.S. Department of Transportation (DOT) regulations. The DOT states that the hazardous material regulations (HMR) also apply to government-owned, contractor-operated (GOCO) transportation operations over any U.S. Department of Energy (DOE) site roadway where the public has free and unrestricted access. Hazardous material and waste in packages that do not meet DOT regulations must be transported on DOE site roadways in a manner that excludes the public and nonessential workers. At the DOE Richland Field Office (the Hanford Site), hazardous material and waste movements that do not meet DOT requirements are transported over public access roadways during off-peak hours with the roadways barricaded. These movements are accomplished using a transportation plan that involves the DOE, DOE contractors, and private utilities who operate on or near the Hanford Site. This method, which is used at the Hanford Site to comply with DOT regulations onsite, can be communicated to other DOE sites to provide a basis for achieving consistency in similar transportation operations. (author)

  9. Guidance to regulations on trade with emission permits for carbon dioxide; Vaegledning till lagstiftning om handel med utslaeppsraetter foer koldioxid

    Energy Technology Data Exchange (ETDEWEB)

    2008-07-15

    This guidance is intended to facilitate application of the rules on emissions trading. The guidance is principally concerned with issues relating to permit appraisal and monitoring, but also discusses some terms common to permits and allocations, such as installation and operator. The guidance follows the same structure as the Swedish Environmental Protection Agency regulations (NFS 2007:5) in order to provide direct support for the rules. The focus is on providing a general description of the responsibilities of the operator and application of the rules. In addition, some difficult terms and relationships are explained. However, no exhaustive description of the operator's responsibilities is given, nor are the rules on verification described. We therefore recommend that the guidance should be read in conjunction with the Trading Act, the Trading Ordinance and the Swedish Environmental Protection Agency regulations. The first chapter presents a brief description of the purpose of the trading scheme, and is followed by a chapter in which the rules on applying for permits and the application procedure are reviewed. The next chapter gives a description of how the operator should monitor emissions and how the rules for the monitoring plan work, as well as the options that exist for simplified monitoring. The next chapter looks at notifications the operator might have to make and what they should contain. Guidance is also provided on how the county administrative board should process these notifications. The conditions of the permit decision are also briefly described. This is followed by a short chapter on the emissions report and the materiality threshold. The final chapter comments on certain parts of the annexes to the regulations. The EU Emissions Trading Directive has been implemented in Sweden through the Emissions Trading Act (2004:1199) (the Trading Act), the Emissions Trading Ordinance (2004:1205), the Swedish Environmental Protection Agency regulations

  10. 40 CFR 122.36 - As an operator of a regulated small MS4, what happens if I don't comply with the application or...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false As an operator of a regulated small... 122.35? 122.36 Section 122.36 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM...

  11. Gaseous diffusion plant transition from DOE to external regulation

    International Nuclear Information System (INIS)

    Dann, R.K.; Crites, T.R.; Rahm-Crites, L.K.

    1997-01-01

    After many years of operation as government-owned/contractor-operated facilities, large portions of the gaseous diffusion plants (GDPs) at Portsmouth, Ohio, and Paducah, Kentucky, were leased to the United States Enrichment Corporation (USEC). These facilities are now certified by the U.S. Nuclear Regulatory Commission (NRC) and subject to oversight by the Occupational Safety and Health Administration (OSHA). The transition from DOE to NRC regulation was more difficult than expected. The original commitment was to achieve NRC certification in October 1995; however, considerably more time was required and transition-related costs escalated. The Oak Ridge Operations Office originally estimated the cost of transition at $60 million; $240 million has been spent to date. The DOE's experience in transitioning the GDPs to USEC operation with NRC oversight provides valuable lessons (both positive and negative) that could be applied to future transitions

  12. Categorizing operational radioactive wastes

    International Nuclear Information System (INIS)

    2007-04-01

    The primary objective of this publication is to improve communications among waste management professionals and Member States relative to the properties and status of radioactive waste. This is accomplished by providing a standardized approach to operational waste categorization using accepted industry practices and experience. It is a secondary objective to draw a distinction between operational waste categorization and waste disposal classification. The approach set forth herein is applicable to waste generation by mature (major, advanced) nuclear programmes, small-to-medium sized nuclear programmes, and programmes with waste from other nuclear applications. It can be used for planning, developing or revising categorization methodologies. For existing categorization programmes, the approach set forth in this publication may be used as a validation and evaluation tool for assessing communication effectiveness among affected organizations or nations. This publication is intended for use by waste management professionals responsible for creating, implementing or communicating effective categorization, processing and disposal strategies. For the users of this publication, it is important to remember that waste categorization is a communication tool. As such, the operational waste categories are not suitable for regulatory purposes nor for use in health and safety evaluations. Following Section 1 (Introduction) Section 2 of this publication defines categorization and its relationship to existing waste classification and management standards, regulations and practices. It also describes the benefits of a comprehensive categorization programme and fundamental record considerations. Section 3 provides an overview of the categorization process, including primary categories and sub-categories. Sections 4 and 5 outline the specific methodology for categorizing unconditioned and conditioned wastes. Finally, Section 6 provides a brief summary of critical considerations that

  13. Liability of German suppliers and service providers for foreign projects; Haftung deutscher Lieferanten und Dienstleister bei Auslandsprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Raetzke, Christian [CONLAR Consulting on Nuclear Law and Regulation, Leipzig (Germany)

    2017-10-15

    Main topic is the question of the extent to which German plant constructors, suppliers, engineering consultants, experts or operators expose themselves to liability for the delivery of their products and services abroad. In principle, in almost all nuclear power countries, liability is channelled to the operator; suppliers and service providers are exempted from liability. However, there are conceivable cases in which this principle does not apply. This can occur, for example, if a major accident is assumed to have an impact on neighbouring countries of the country of destination; here, depending on the applicable law, the German supplier or service provider could be ordered to pay for damages. The risk of liability remaining in this way can be reduced if necessary by means of an exemption clause in the supply contract. The regulation of the operator's recourse to the contractor, insofar as the latter is responsible for the accident, and the - controversial -question of to what extent damage to the plant itself gives rise to claims for damages by the operator against the contractor are also discussed.

  14. Business Ethics of Tour Operators – The Case Study of TUI

    Directory of Open Access Journals (Sweden)

    Marija Šuleić

    2014-10-01

    Full Text Available A large number of participants in tourism, both in offer and in demand, has conditioned the need for the creation ethical codices based on legislative regulations and moral principles. Among central figures in tourism, there are travel agencies and tour operators, the intermediaries between service providers and service users, in other words, passengers. The tour operators who are engaged in initiating tourism provide the services on foreign markets and tend to adapt their business to the laws and customs of the countries in which they run a business. TUI, as a leading European tour operator, which has even its representation in Serbia, can be a good example of the implementation of its business codes of ethics, but also adapting to the business customs being valid in the country in which TUI operates. Because of this, the aim of this work was to examine under what ethical standards TUI operates in Serbia in the domain of different stakeholders. The results of the research can be useful for different stakeholders.

  15. Spatio-temporal variations of carbon dioxide and its gross emission regulated by artificial operation in a typical hydropower reservoir in China.

    Science.gov (United States)

    Li, Zhe; Zhang, Zengyu; Xiao, Yan; Guo, Jinsong; Wu, Shengjun; Liu, Jing

    2014-05-01

    Supersaturation and excess emission of greenhouse gases in freshwater reservoirs have received a great deal of attention in recent years. Although impoundment of reservoirs has been shown to contribute to the net emission of greenhouse gases, reservoir age, geographical distribution, submerged soil type and artificial regulation also have a great impact on their emissions. To examine how large scale reservoir operation impact the water column CO2 and its air-water interface flux, a field study was conducted in 2010 to evaluate potential ecological processes that regulate the partial pressure of CO2 (pCO2) in the water column in the Pengxi River backwater area (PBA), a typical tributary in the Three Gorges Reservoir, China. Measurements of total alkalinity (TA), pH and water temperature were applied to compute the pCO2. And this approach was also validated by calculation of pCO2 from the dissolved inorganic carbon data of samples. Partial least squares (PLS) regression was used to determine how the dynamics of the water pCO2 were related to the available variables. The estimated pCO2 in our sample ranged from 26 to 4,087 μatm in the surface water. During low water operation from July to early September, there was an obvious pCO2 stratification, and pCO2 in the surface was almost unsaturated. This phenomenon was also observed in the spring bloom during discharge period. Conversely, there was no significant pCO2 stratification and the entire water column was supersaturated during high water operation from November to the following February. Significant correlation was observed between the magnitude of pCO2, DO and chlorophyll a, suggesting that phytoplankton dynamics regulate pCO2 in the PBA. The average areal rate of CO2 emissions from the Pengxi River ranged from 18.06 to 48.09 mmol m(-2) day(-1), with an estimated gross CO2 emission from the water surface of 14-37 t day(-1) in this area in 2010. Photosynthesis and respiration rates by phytoplankton might be the

  16. 48 CFR 18.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contingency operation. 18... METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 18.201 Contingency operation. (a) Contingency operation is defined in 2.101. (b) Micro-purchase threshold. The threshold...

  17. Factors affecting the entry of for-profit providers into a price regulated market for formal long-term care services: a case study from Japan.

    Science.gov (United States)

    Tokunaga, Mutsumi; Hashimoto, Hideki

    2013-01-01

    While the distinct behaviors of for-profit and non-profit providers in the healthcare market have been compared in the economic literature, their choices regarding market entry and exit have only recently been debated. Since 2000, when public Long-Term Care Insurance was introduced in Japan, for-profit providers have been able to provide formal long-term homecare services. The aim of this study is to determine which factors have affected market entry of for-profit providers under price regulation and in competition with existing non-profit providers. We used nation-wide panel data from 2002 to 2010, aggregated at the level of local public insurers (n = 1557), a basic area unit of service provision. The number of for-profit providers per elderly population in the area unit was regressed against factors related to local demand and service costs using first-difference linear regression, a fixed effects model, and Tobit regression for robustness checking. Results showed that demand (the number of eligible care recipients) and cost factors (population density and minimum wage) significantly influenced for-profit providers' choice of market entry. These findings indicate that for-profit providers will strategically choose a local market for maximizing profit. We believe that price regulation should be redesigned to incorporate quality of care and market conditions, regardless of the profit status of the providers, to ensure equal access to efficient delivery of long-term care across all regions. Copyright © 2012 Elsevier Ltd. All rights reserved.

  18. THE SIMULATION DIAGNOSTIC METHODS AND REGENERATION WAYS OF REINFORCED - CONCRETE CONSTRUCTIONS OF BRIDGES IN PROVIDING THEIR OPERATING RELIABILITY AND LONGEVITY

    OpenAIRE

    B. V. Savchinskiy

    2010-01-01

    On the basis of analysis of existing diagnostic methods and regeneration ways of reinforced-concrete constructions of bridges the recommendations on introduction of new modern technologies of renewal of reinforced-concrete constructions of bridges in providing their operating reliability and longevity are offered.

  19. Regulatory co-operation: The next decade. Annex III

    International Nuclear Information System (INIS)

    Ryder, E.

    1991-01-01

    Nuclear power has great potential to help satisfy the increased demands for electrical energy and allay concerns about the environmental damage done by electric power generation due to fossil fuels. Experience has shown that the cautious approach to nuclear power development, dictated by the knowledge of the destructive power that could be released by an accident, has been justified. The cooperation fostered by the IAEA has helped designers, constructors, operators and regulators share data and experiences and this has helped to ensure that basic standards and procedures are in place in all countries with nuclear power programmes. But, the reminders of the need for greater care provided by the two major reactor accidents in the last dozen years and doubts in the minds of the general public have reinforced the need for further co-operation in the next decade. National regulators will have to play their full part in the development of international standards which will not only lead to the necessary levels of safety but be widely recognized as doing so

  20. Operator-assisted planning and execution of proximity operations subject to operational constraints

    Science.gov (United States)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1991-01-01

    Future multi-vehicle operations will involve multiple scenarios that will require a planning tool for the rapid, interactive creation of fuel-efficient trajectories. The planning process must deal with higher-order, non-linear processes involving dynamics that are often counter-intuitive. The optimization of resulting trajectories can be difficult to envision. An interaction proximity operations planning system is being developed to provide the operator with easily interpreted visual feedback of trajectories and constraints. This system is hosted on an IRIS 4D graphics platform and utilizes the Clohessy-Wiltshire equations. An inverse dynamics algorithm is used to remove non-linearities while the trajectory maneuvers are decoupled and separated in a geometric spreadsheet. The operator has direct control of the position and time of trajectory waypoints to achieve the desired end conditions. Graphics provide the operator with visualization of satisfying operational constraints such as structural clearance, plume impingement, approach velocity limits, and arrival or departure corridors. Primer vector theory is combined with graphical presentation to improve operator understanding of suggested automated system solutions and to allow the operator to review, edit, or provide corrective action to the trajectory plan.

  1. 77 FR 29924 - Drawbridge Operation Regulation; Alabama River, AL

    Science.gov (United States)

    2012-05-21

    ... unlimited in the open-to-navigation position. No alternate routes are available. Due to the limited number... between the Federal Government and Indian tribes. 11. Energy Effects We have analyzed this proposed rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply...

  2. 77 FR 57022 - Drawbridge Operation Regulation; Alabama River, AL

    Science.gov (United States)

    2012-09-17

    ... closed-to-navigation position and unlimited in the open-to-navigation position. No alternate routes are... Indian tribes. 12. Energy Effects We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that...

  3. 5 CFR 890.910 - Provider information.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Provider information. 890.910 Section 890.910 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS..., and FEHB Benefit Payments § 890.910 Provider information. The hospital provider information used to...

  4. Decentralized method for utility regulation

    Energy Technology Data Exchange (ETDEWEB)

    Loeb, M. (North Carolina State Univ., Raleigh); Magat, W.A.

    1979-10-01

    A new institutional arrangement for regulating utilities is suggested that minimizes the costs of natural monopolies. A mixture of regulation and franchising, the plan draws on the advantages of each and eliminates many of the problems. The proposal allows utilities to set their own price on the basis of demand and marginal-cost projections. Subsidies are provided by the regulatory agency if there is a consumer surplus. The system encourages the utility to select a competitive price and to produce only the amount of service needed. Operating efficiency is encouraged by rewarding cost reductions and discouraging cost overstatement at the rate review. The regulatory agency would not need to take action to bring price and marginal costs into equality. The franchise sale can be made by competitive bidding, in which the bidders would capitalize part or all of the subsidy or the regulatory agency could recover the subsidy in a lump-sum tax on the utility.

  5. Occupational exposures to uranium: processes, hazards, and regulations

    International Nuclear Information System (INIS)

    Stoetzel, G.A.; Fisher, D.R.; McCormack, W.D.; Hoenes, G.R.; Marks, S.; Moore, R.H.; Quilici, D.G.; Breitenstein, B.D.

    1981-04-01

    The United States Uranium Registry (USUR) was formed in 1978 to investigate potential hazards from occupational exposure to uranium and to assess the need for special health-related studies of uranium workers. This report provides a summary of Registry work done to date. The history of the uranium industry is outlined first, and the current commercial uranium industry (mining, milling, conversion, enrichment, and fuel fabrication) is described. This description includes information on basic processes and areas of greatest potential radiological exposure. In addition, inactive commercial facilities and other uranium operations are discussed. Regulation of the commercial production industry for uranium fuel is reported, including the historic development of regulations and the current regulatory agencies and procedures for each phase of the industry. A review of radiological health practices in the industry - facility monitoring, exposure control, exposure evaluation, and record-keeping - is presented. A discussion of the nonradiological hazards of the industry is provided, and the final section describes the tissue program developed as part of the Registry

  6. Analysis of the results of the energy market operation

    International Nuclear Information System (INIS)

    Popovska, V.; Diankov, M.

    2006-01-01

    The paper focuses on the results of the market operation. It includes: analysis of the active market participants and steps to be undertaken in respect of access to the grid and registration on the market, as well as a comparative analysis of the trade at regulated and freely negotiated prices. This report analyses the imbalances of the consumers of energy, generators, including generators operating with one unit. Information about the special role of the public supplier as a main provider of balancing energy, market interruption in case of emergency situation and force major events, circumstances for the parties and contractual relationship is also included. (authors)

  7. The operation of contractors on nuclear sites: French regulations

    International Nuclear Information System (INIS)

    Mayoux, J.C.; Derche, B.

    1985-01-01

    The first purpose of this paper is to show how the French common law -as it results from the code of labour and holdings of the courts- deals with the intervention of contractors. The second part analyses the special regulations in force to ensure radiation protection [fr

  8. New Nuclear Safety Regulations

    International Nuclear Information System (INIS)

    Novosel, N.; Prah, M.; Cizmek, A.

    2008-01-01

    Beside new Ordinance on the control of nuclear material and special equipment (Official Gazette No. 15/08), from 2006 State Office for Nuclear Safety (SONS) adopted Ordinance on performing nuclear activities (Official Gazette No. 74/06) and Ordinance on special conditions for individual activities to be performed by expert organizations which perform activities in the area of nuclear safety (Official Gazette No. 74/06), based on Nuclear Safety Act (Official Gazette No. 173/03). The Ordinance on performing nuclear activities regulates the procedure of announcing the intention to perform nuclear activity, submitting an application for the issue of a license to perform nuclear activity, and the procedure for adoption a decision on issuing a nuclear activity license. The Ordinance also regulates the contents of the application form for the announcement of the intention to perform nuclear activity, as well as of the application for the issue of a nuclear activity license and the method of keeping a nuclear activity register. The Ordinance on special conditions for individual activities to be performed by expert organizations which perform activities in the area of nuclear safety regulates these mentioned conditions, whereas compliance is established by a decision passed by the SONS. Special conditions for individual activities to be performed by expert organizations which perform activities in the area of nuclear safety are organizational, technical, technological conditions and established system of quality assurance. In 2007, SONS finalized the text of new Ordinance on nuclear safety and protection conditions for location, design, construction, operation and decommissioning of facility in which nuclear activity is performed. This Ordinance regulates nuclear safety and protection conditions for location, design, construction, operation and decommissioning of facility in which nuclear activity is performed. This Ordinance defines facilities in which nuclear activity is

  9. Recommended management practices for operation and closure of shallow injection wells at DOE facilities

    International Nuclear Information System (INIS)

    1993-07-01

    The Safe Drinking Water Act established the Underground Injection Control (UIC) program to ensure that underground injection of wastes does not endanger an underground source of drinking water. Under UIC regulations, an injection well is a hole in the ground, deeper than it is wide, that receives wastes or other fluid substances. Types of injection wells range from deep cased wells to shallow sumps, drywells, and drainfields. The report describes the five classes of UIC wells and summarizes relevant regulations for each class of wells and for the UIC program. The main focus of the report is Class IV and V shallow injection wells. Class IV wells are prohibited and should be closed when they are identified. Class V wells are generally authorized by rule, but EPA or a delegated state may require a permit for a Class V well. This report provides recommendations on sound operating and closure practices for shallow injection wells. In addition the report contains copies of several relevant EPA documents that provide additional information on well operation and closure. Another appendix contains information on the UIC programs in 21 states in which there are DOE facilities discharging to injection wells. The appendix includes the name of the responsible regulatory agency and contact person, a summary of differences between the state's regulations and Federal regulations, and any closure guidelines for Class IV and V wells

  10. Development in France of nuclear safety technical regulations and standards used in the licensing procedure

    International Nuclear Information System (INIS)

    Lebouleux, P.

    1983-04-01

    Initially, the Commissariat a l'Energie Atomique was the overall structure which encompassed all nuclear activities in France, including those connected with radiological protection and nuclear safety. As other partners appeared, the Authorities have laid down national regulations relative to nuclear installations since 1963. These regulations more particularly provide for the addition of prescriptions with which the applicant must comply to obtain the necessary licenses and the establishment of General Technical Regulations pertaining to nuclear safety. The technical regulation related to nuclear safety in France is made of a set of regulation texts, of a different nature, that define the requirements for the construction, commissioning and operation of nuclear facilities. Simultaneously, the safety authorities (Service Central de Surete des Installations Nucleaires: SCSIN) issue recommendations or guides which are not strictly speaking regulations in the juridical sense; they are called ''Regles Fondamentales de Surete'' (RFS). The RFS set up and detail the conditions, the respect of which is deemed to be complying with the French regulation practice, for the subject to which they relate. Their purpose is to make known rules judged acceptable by safety authorities, thus making the safety review easier. A RFS, or a letter, can also give the result of the examination of the constructor and operator codes (RCC) by safety authorities

  11. Operational constraints and hydrologic variability limit hydropower in supporting wind integration

    International Nuclear Information System (INIS)

    Fernandez, Alisha R; Blumsack, Seth A; Reed, Patrick M

    2013-01-01

    Climate change mitigation will require rapid adoption of low-carbon energy resources. The integration of large-scale wind energy in the United States (US) will require controllable assets to balance the variability of wind energy production. Previous work has identified hydropower as an advantageous asset, due to its flexibility and low-carbon emissions production. While many dams currently provide energy and environmental services in the US and globally, we find that multi-use hydropower facilities would face significant policy conflicts if asked to store and release water to accommodate wind integration. Specifically, we develop a model simulating hydroelectric operational decisions when the electric facility is able to provide wind integration services through a mechanism that we term ‘flex reserves’. We use Kerr Dam in North Carolina as a case study, simulating operations under two alternative reservoir policies, one reflecting current policies and the other regulating flow levels to promote downstream ecosystem conservation. Even under perfect information and significant pricing incentives, Kerr Dam faces operational conflicts when providing any substantial levels of flex reserves while also maintaining releases consistent with other river management requirements. These operational conflicts are severely exacerbated during periods of drought. Increase of payments for flex reserves does not resolve these operational and policy conflicts. (letter)

  12. Fundamentals of Using Battery Energy Storage Systems to Provide Primary Control Reserves in Germany

    Directory of Open Access Journals (Sweden)

    Alexander Zeh

    2016-09-01

    Full Text Available The application of stationary battery storage systems to German electrical grids can help with various storage services. This application requires controlling the charge and discharge power of such a system. For example, photovoltaic (PV home storage, uninterruptible power supply, and storage systems for providing ancillary services such as primary control reserves (PCRs represent battery applications with positive profitability. Because PCRs are essential for stabilizing grid frequency and maintaining a robust electrical grid, German transmission system operators (TSOs released strict regulations in August 2015 for providing PCRs with battery storage systems as part of regulating the International Grid Control Cooperation (IGCC region in Europe. These regulations focused on the permissible state of charge (SoC of the battery during nominal and extreme conditions. The concomitant increased capacity demand oversizing may result in a significant profitability reduction, which can be attenuated only by using an optimal parameterization of the control algorithm for energy management of the storage systems. In this paper, the sizing optimization is achieved and a recommendation for a control algorithm that includes the appropriate parameters for the requirements in the German market is given. Furthermore, the storage cost is estimated, including battery aging simulations for different aging parameter sets to allow for a realistic profitability calculation.

  13. Post-translational regulation enables robust p53 regulation.

    Science.gov (United States)

    Shin, Yong-Jun; Chen, Kai-Yuan; Sayed, Ali H; Hencey, Brandon; Shen, Xiling

    2013-08-30

    The tumor suppressor protein p53 plays important roles in DNA damage repair, cell cycle arrest and apoptosis. Due to its critical functions, the level of p53 is tightly regulated by a negative feedback mechanism to increase its tolerance towards fluctuations and disturbances. Interestingly, the p53 level is controlled by post-translational regulation rather than transcriptional regulation in this feedback mechanism. We analyzed the dynamics of this feedback to understand whether post-translational regulation provides any advantages over transcriptional regulation in regard to disturbance rejection. When a disturbance happens, even though negative feedback reduces the steady-state error, it can cause a system to become less stable and transiently overshoots, which may erroneously trigger downstream reactions. Therefore, the system needs to balance the trade-off between steady-state and transient errors. Feedback control and adaptive estimation theories revealed that post-translational regulation achieves a better trade-off than transcriptional regulation, contributing to a more steady level of p53 under the influence of noise and disturbances. Furthermore, post-translational regulation enables cells to respond more promptly to stress conditions with consistent amplitude. However, for better disturbance rejection, the p53- Mdm2 negative feedback has to pay a price of higher stochastic noise. Our analyses suggest that the p53-Mdm2 feedback favors regulatory mechanisms that provide the optimal trade-offs for dynamic control.

  14. Completion plug design provides improved operational efficiency and safety while minimizing environmental risks

    Energy Technology Data Exchange (ETDEWEB)

    Dum, Frank [T.D. Williamson, Inc., Tulsa, OK (United States)

    2012-07-01

    Pipeline repair standards have been raised with recent improvements for completion plugs when used with a brand new setting tool, resulting in lower environmental risks, improved operational efficiency and safety. The design changes were originally made to serve in an offshore environment in order to minimize the diver's time in the water and simplify steps by the diver to execute pipeline repair operations in cold, dark conditions. Enhancements in the design include fewer number of fittings, plugs, o-rings and gaskets isolating the pipeline product found inside the pipe. The new design is a step toward meeting strict operational and safety standards demanded in the field of pipeline maintenance and repair. (author)

  15. THE SIMULATION DIAGNOSTIC METHODS AND REGENERATION WAYS OF REINFORCED - CONCRETE CONSTRUCTIONS OF BRIDGES IN PROVIDING THEIR OPERATING RELIABILITY AND LONGEVITY

    Directory of Open Access Journals (Sweden)

    B. V. Savchinskiy

    2010-03-01

    Full Text Available On the basis of analysis of existing diagnostic methods and regeneration ways of reinforced-concrete constructions of bridges the recommendations on introduction of new modern technologies of renewal of reinforced-concrete constructions of bridges in providing their operating reliability and longevity are offered.

  16. PKA and PDE4D3 anchoring to AKAP9 provides distinct regulation of cAMP signals at the centrosome

    Science.gov (United States)

    Terrin, Anna; Monterisi, Stefania; Stangherlin, Alessandra; Zoccarato, Anna; Koschinski, Andreas; Surdo, Nicoletta C.; Mongillo, Marco; Sawa, Akira; Jordanides, Niove E.; Mountford, Joanne C.

    2012-01-01

    Previous work has shown that the protein kinase A (PKA)–regulated phosphodiesterase (PDE) 4D3 binds to A kinase–anchoring proteins (AKAPs). One such protein, AKAP9, localizes to the centrosome. In this paper, we investigate whether a PKA–PDE4D3–AKAP9 complex can generate spatial compartmentalization of cyclic adenosine monophosphate (cAMP) signaling at the centrosome. Real-time imaging of fluorescence resonance energy transfer reporters shows that centrosomal PDE4D3 modulated a dynamic microdomain within which cAMP concentration selectively changed over the cell cycle. AKAP9-anchored, centrosomal PKA showed a reduced activation threshold as a consequence of increased autophosphorylation of its regulatory subunit at S114. Finally, disruption of the centrosomal cAMP microdomain by local displacement of PDE4D3 impaired cell cycle progression as a result of accumulation of cells in prophase. Our findings describe a novel mechanism of PKA activity regulation that relies on binding to AKAPs and consequent modulation of the enzyme activation threshold rather than on overall changes in cAMP levels. Further, we provide for the first time direct evidence that control of cell cycle progression relies on unique regulation of centrosomal cAMP/PKA signals. PMID:22908311

  17. Operational status of nuclear facilities in Japan. 2012 edition

    International Nuclear Information System (INIS)

    2012-01-01

    This document is a compilation which provides an outline of the administration of nuclear facility safety regulations as well as various data including operational status, the status of periodical and safety inspections, the status of issues, and radiation management on nuclear power reactor facilities, reactor facilities in the research and development stage, and fabrication, reprocessing, disposal, and storage facilities in fiscal year 2011 (from April 2011 to March 2012). (J.P.N.)

  18. General transfer matrix formalism to calculate DNA-protein-drug binding in gene regulation: application to OR operator of phage lambda.

    Science.gov (United States)

    Teif, Vladimir B

    2007-01-01

    The transfer matrix methodology is proposed as a systematic tool for the statistical-mechanical description of DNA-protein-drug binding involved in gene regulation. We show that a genetic system of several cis-regulatory modules is calculable using this method, considering explicitly the site-overlapping, competitive, cooperative binding of regulatory proteins, their multilayer assembly and DNA looping. In the methodological section, the matrix models are solved for the basic types of short- and long-range interactions between DNA-bound proteins, drugs and nucleosomes. We apply the matrix method to gene regulation at the O(R) operator of phage lambda. The transfer matrix formalism allowed the description of the lambda-switch at a single-nucleotide resolution, taking into account the effects of a range of inter-protein distances. Our calculations confirm previously established roles of the contact CI-Cro-RNAP interactions. Concerning long-range interactions, we show that while the DNA loop between the O(R) and O(L) operators is important at the lysogenic CI concentrations, the interference between the adjacent promoters P(R) and P(RM) becomes more important at small CI concentrations. A large change in the expression pattern may arise in this regime due to anticooperative interactions between DNA-bound RNA polymerases. The applicability of the matrix method to more complex systems is discussed.

  19. A Qualitative Study of Vape Shop Operators' Perceptions of Risks and Benefits of E-Cigarette Use and Attitude Toward Their Potential Regulation by the US Food and Drug Administration, Florida, Georgia, South Carolina, or North Carolina, 2015.

    Science.gov (United States)

    Nayak, Pratibha; Kemp, Catherine B; Redmon, Pamela

    2016-05-19

    Approximately 8,500 vape shops in the United States sell a variety of electronic nicotine delivery systems (ENDS). This study examined vape shop operators' perceptions of benefits and risk of ENDS use, what they perceive to be the reasons for ENDS use, their source of product information, what information they shared with customers, and the impact of existing and future regulation of ENDS on its use and on their business. We conducted qualitative interviews with 20 vape shop operators located in Florida, Georgia, South Carolina, and North Carolina in spring 2015. A semi-structured interview guide was used, and interviews were audio-recorded and transcribed verbatim. The transcripts were analyzed using NVIVO software. Vape shop owners perceived ENDS to be less harmful and more economical than conventional cigarettes and indicated that most of their customers used ENDS as a smoking cessation tool. Most owners were former smokers and used ENDS to quit. Shop owners relied on their personal experiences and the Internet for information, and shared information with customers at point of sale by using the shop's website and social media. Most expressed concern that complying with potential regulations, including banning flavors or tax increases, would jeopardize their business. Some felt that ENDS should not be regulated as tobacco products and felt that big tobacco was behind these proposed regulations. Most owners supported age restrictions and quality controls for e-liquid. Vape shop owners are in a unique position to serve as frontline consumer educators. Interventions should focus on providing them with current information on benefits and risks of ENDS and information on national, state, and local regulations and compliance requirements.

  20. ADVANCED TOKAMAK OPERATION USING THE DIII-D PLASMA CONTROL SYSTEM

    International Nuclear Information System (INIS)

    HUMPHREYS, DA; FERRON, JR; GAROFALO, AM; HYATT, AW; JERNIGAN, TC; JOHNSON, RD; LAHAYE, RJ; LEUER, JA; OKABAYASHI, M; PENAFLOR, BG; SCOVILLE, JT; STRAIT, EJ; WALKER, ML; WHYTE, DG

    2002-01-01

    A271 ADVANCED TOKAMAK OPERATION USING THE DIII-D PLASMA CONTROL SYSTEM. The principal focus of experimental operations in the DIII-D tokamak is the advanced tokamak (AT) regime to achieve, which requires highly integrated and flexible plasma control. In a high performance advanced tokamak, accurate regulation of the plasma boundary, internal profiles, pumping, fueling, and heating must be well coordinated with MHD control action to stabilize such instabilities as tearing modes and resistive wall modes. Sophisticated monitors of the operational regime must provide detection of off-normal conditions and trigger appropriate safety responses with acceptable levels of reliability. Many of these capabilities are presently implemented in the DIII-D plasma control system (PCS), and are now in frequent or routine operational use. The present work describes recent development, implementation, and operational experience with AT regime control elements for equilibrium control, MHD suppression, and off-normal event detection and response

  1. Operating the plant, quality assurance, and the job of the operating staff, Volume Twelve

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    Subject matter includes operating the plant (the role of the operator, the control room, plant technical specifications, plant operating procedures, initial startup program, BWR/PWR plant startup, BWR/PWR steady state power operation, BWR/PWR transient operation, emergency operation), quality assurance (what is quality, what is quality control, quality assurance includes quality control, government regulation and quality assurance, administrative controls for nuclear power plants, the necessity of reviews and audits, practical quality assurance), and the job of the operating staff (the plant operating staff, plant safety, first aid and resuscitation, general plant hazards, personnel protective equipment, handling chemicals, handling compressed gas, equipment repair and maintenance, communicating with others

  2. RNA-seq Transcriptional Profiling of an Arbuscular Mycorrhiza Provides Insights into Regulated and Coordinated Gene Expression in Lotus japonicus and Rhizophagus irregularis.

    Science.gov (United States)

    Handa, Yoshihiro; Nishide, Hiroyo; Takeda, Naoya; Suzuki, Yutaka; Kawaguchi, Masayoshi; Saito, Katsuharu

    2015-08-01

    Gene expression during arbuscular mycorrhizal development is highly orchestrated in both plants and arbuscular mycorrhizal fungi. To elucidate the gene expression profiles of the symbiotic association, we performed a digital gene expression analysis of Lotus japonicus and Rhizophagus irregularis using a HiSeq 2000 next-generation sequencer with a Cufflinks assembly and de novo transcriptome assembly. There were 3,641 genes differentially expressed during arbuscular mycorrhizal development in L. japonicus, approximately 80% of which were up-regulated. The up-regulated genes included secreted proteins, transporters, proteins involved in lipid and amino acid metabolism, ribosomes and histones. We also detected many genes that were differentially expressed in small-secreted peptides and transcription factors, which may be involved in signal transduction or transcription regulation during symbiosis. Co-regulated genes between arbuscular mycorrhizal and root nodule symbiosis were not particularly abundant, but transcripts encoding for membrane traffic-related proteins, transporters and iron transport-related proteins were found to be highly co-up-regulated. In transcripts of arbuscular mycorrhizal fungi, expansion of cytochrome P450 was observed, which may contribute to various metabolic pathways required to accommodate roots and soil. The comprehensive gene expression data of both plants and arbuscular mycorrhizal fungi provide a powerful platform for investigating the functional and molecular mechanisms underlying arbuscular mycorrhizal symbiosis. © The Author 2015. Published by Oxford University Press on behalf of Japanese Society of Plant Physiologists. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  3. Determination of permissible doses under the provisions of the regulations on installation and operation of reactors for power generation

    International Nuclear Information System (INIS)

    1979-01-01

    The determination is defined under the regulations on installation and operation of reactors for power generation. In the controlled area exterior radiation dose shall be 30 mili-rem for a week by the Minister of International Trade and Industry. The concentrations of radioactive materials in the air or under the water shall be permissible concentrations specified for the employees multiplied by 0.75 in average for a week. The densities of radioactive materials on the surface of the things contaminated by such materials shall be 1/10 of permissible surface densities stipulated in the table attached. Permissible exposure dose outside the inspected surrounding area is 0.5 rem for a year. Permissible surface densities are included in the table attached. Permissible accumulative dose for the employees is the figure (unit rem) calculated by the formula D = 5(N-18), when D means permissible accumulative dose and N number of the age. Permissible exposure dose is 3 rem for 3 months for the employees, 1.5 rem for a year for persons other than the employees and 12 rem for the urgent work. Permissible concentrations are defined in detail for the employees and outside the inspected surrounding area. Calculation of exposure dose in the case of interior exposure is particularly provided for. (Okada, K.)

  4. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  5. Operational limits and conditions and operating procedures for nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2000-01-01

    This Safety Guide was prepared as part of the Agency's programme for establishing safety standards relating to nuclear power plants. The present Safety Guide supersedes the IAEA Safety Guide on Operational Limits and Conditions for Nuclear Power Plants which was issued in 1979 as Safety Series No. 50-SG-O3. For a nuclear power plant to be operated in a safe manner, the provisions made in the final design and subsequent modifications shall be reflected in limitations on plant operating parameters and in the requirements on plant equipment and personnel. Under the responsibility of the operating organization, these shall be developed during the design safety evaluation as a set of operational limits and conditions (OLCs). A major contribution to compliance with the OLCs is made by the development and utilization of operating procedures (OPs) that are consistent with and fully implement the OLCs. The requirements for the OLCs and OPs are established in Section 5 of the IAEA Safety Requirements publication Safety of Nuclear Power Plants: Operation, which this Safety Guide supplements. The purpose of this Safety Guide is to provide guidance on the development, content and implementation of OLCs and OPs. The Safety Guide is directed at both regulators and owners/operators. This Safety Guide covers the concept of OLCs, their content as applicable to land based stationary power plants with thermal neutron reactors, and the responsibilities of the operating organization regarding their establishment, modification, compliance and documentation. The OPs to support the implementation of the OLCs and to ensure their observance are also within the scope of this Safety Guide. The particular aspects of the procedures for maintenance, surveillance, in-service inspection and other safety related activities in connection with the safe operation of nuclear power plants are outside the scope of this Safety Guide but can be found in other IAEA Safety Guides. Section 2 indicates the

  6. Updating of the program for simulation of Darlington shutdown and regulation systems

    International Nuclear Information System (INIS)

    1988-07-01

    This report describes the current status of the developments of a simulation of the Darlington Nuclear Generating Station shutdown and regulating systems, DARSIM done under contract to the Atomic Energy Control Board (AECB). The DARSIM program simulates the spatial neutron dynamics, the regulation of the reactor power, and shutdown system 1 and shutdown system 2 software. The DARSIM program operates in the interactive simulation program environment. DARSIM was installed on the APOLLO computer at the AECB and a version for an IBM-PC was also provided for the exclusive use of the AECB. Shutdown system software was updated to incorporate the latest revisions in the functional specifications. Additional developments have been provided to assist in the use and interpretation of the DARSIM results

  7. Vehicle-to-Grid for islanded power system operation in Bornholm

    DEFF Research Database (Denmark)

    Pillai, Jayakrishnan Radhakrishna; Bak-Jensen, Birgitte

    2010-01-01

    Vehicle-to-Grid (V2G) systems are an emerging concept of utilizing the battery storage of electric vehicles (EVs) for providing power system regulation services. This technology could be used to balance the variable electricity generated from various renewable energy sources. This article considers...... a model of an aggregated electric vehicle based battery storage to support an isolated power system operating with a large wind power penetration in the Danish island of Bornholm. From the simulation results, the EV battery storages represented by the V2G systems are able to integrate more fluctuating...... wind power. The islanded Bornholm power system operates satisfactory for the case of replacing most of the conventional generator reserves with V2G systems, which may represent a future operation scenario....

  8. 49 CFR 41.119 - DOT regulated buildings.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false DOT regulated buildings. 41.119 Section 41.119 Transportation Office of the Secretary of Transportation SEISMIC SAFETY § 41.119 DOT regulated buildings. (a) Each DOT Operating Administration with responsibility for regulating the structural safety of buildings...

  9. Transient Receptor Potential Canonical (TRPC)/Orai1-dependent Store-operated Ca2+ Channels

    Science.gov (United States)

    Sabourin, Jessica; Bartoli, Fiona; Antigny, Fabrice; Gomez, Ana Maria; Benitah, Jean-Pierre

    2016-01-01

    Store-operated Ca2+ entry (SOCE) has emerged as an important mechanism in cardiac pathology. However, the signals that up-regulate SOCE in the heart remain unexplored. Clinical trials have emphasized the beneficial role of mineralocorticoid receptor (MR) signaling blockade in heart failure and associated arrhythmias. Accumulated evidence suggests that the mineralocorticoid hormone aldosterone, through activation of its receptor, MR, might be a key regulator of Ca2+ influx in cardiomyocytes. We thus assessed whether and how SOCE involving transient receptor potential canonical (TRPC) and Orai1 channels are regulated by aldosterone/MR in neonatal rat ventricular cardiomyocytes. Molecular screening using qRT-PCR and Western blotting demonstrated that aldosterone treatment for 24 h specifically increased the mRNA and/or protein levels of Orai1, TRPC1, -C4, -C5, and stromal interaction molecule 1 through MR activation. These effects were correlated with a specific enhancement of SOCE activities sensitive to store-operated channel inhibitors (SKF-96365 and BTP2) and to a potent Orai1 blocker (S66) and were prevented by TRPC1, -C4, and Orai1 dominant negative mutants or TRPC5 siRNA. A mechanistic approach showed that up-regulation of serum- and glucocorticoid-regulated kinase 1 mRNA expression by aldosterone is involved in enhanced SOCE. Functionally, 24-h aldosterone-enhanced SOCE is associated with increased diastolic [Ca2+]i, which is blunted by store-operated channel inhibitors. Our study provides the first evidence that aldosterone promotes TRPC1-, -C4-, -C5-, and Orai1-mediated SOCE in cardiomyocytes through an MR and serum- and glucocorticoid-regulated kinase 1 pathway. PMID:27129253

  10. Design and Control of a Buck–Boost Charger-Discharger for DC-Bus Regulation in Microgrids

    Directory of Open Access Journals (Sweden)

    Carlos Andrés Ramos-Paja

    2017-11-01

    Full Text Available In DC and hybrid microgrids (MG, the DC-bus regulation using Energy Storage Devices (ESD is important for the stable operation of both the generators and loads. There are multiple commercial voltage levels for both ESD and DC-bus; therefore, the ESD voltage may be higher, equal or lower than the DC-bus voltage depending on the application. Moreover, most of the ESD converter controllers are linear-based, hence they ensure stability in a limited operation range. This paper proposes a system to regulate the DC-bus voltage of an MG accounting for any voltage relation between the ESD and the DC-bus voltage. The proposed system is formed by an ESD connected to a DC-bus through a bidirectional Buck–Boost converter, which is regulated by a Sliding-Mode Controller (SMC to ensure the system stability in the entire operation range. The SMC drives the Buck–Boost charger–discharger to regulate the DC-bus voltage, at the desired reference value, by charging or discharging the ESD. This paper also provides detailed procedures to design the parameters of both the SMC and the charger–dischager. Finally, simulation and experimental results validate the proposed solution and illustrate its performance.

  11. 48 CFR 32.104 - Providing contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.104 Section 32.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.104 Providing contract financing. (a) Prudent contract financing can be a useful working tool in Government...

  12. Regulatory Approach to Safety of Long Time Operating Research Reactors in Russia

    Energy Technology Data Exchange (ETDEWEB)

    Sapozhnikov, Alexander [Industrial and Nuclear Supervision Service, Moscow (Russian Federation)

    2013-07-01

    In the Russian Federation more than 60% of operating Nuclear Research Facilities (NRFs) are of age over 30 years old or their usage exceeds originally conceived continuous operation. In this regard, important areas of regulatory body activity are: 1) a systematic assessment of the actual state of structures, systems and components (SSCs) important to safety, 2) control of implementation of organizational and technical measures to mitigate ageing impact on the basis of programmes to manage reliability (service life) of SSCs, and 3) issues of facility modification/reconstruction in line with up-to-day safety requirements. The practice of licensing NRFs with long operating times shows that the national regulations are generally in compliance with IAEA recommendations for ageing management of research reactors. In operating organizations, the ageing management is being effectively provided as a part of the integrated management system for NRFs, including the monitoring of the reliability of SSCs, a methodology to detect their ageing, reporting and investigation of events, analysis of their root causes, and measures to prevent and mitigate ageing effects to safety. The report outlines a good practice of safety regulation of NRFs with long operating times and based on lessons learned from experience, including challenges for future improvement of ageing management.

  13. Regulatory Approach to Safety of Long Time Operating Research Reactors in Russia

    International Nuclear Information System (INIS)

    Sapozhnikov, Alexander

    2013-01-01

    In the Russian Federation more than 60% of operating Nuclear Research Facilities (NRFs) are of age over 30 years old or their usage exceeds originally conceived continuous operation. In this regard, important areas of regulatory body activity are: 1) a systematic assessment of the actual state of structures, systems and components (SSCs) important to safety, 2) control of implementation of organizational and technical measures to mitigate ageing impact on the basis of programmes to manage reliability (service life) of SSCs, and 3) issues of facility modification/reconstruction in line with up-to-day safety requirements. The practice of licensing NRFs with long operating times shows that the national regulations are generally in compliance with IAEA recommendations for ageing management of research reactors. In operating organizations, the ageing management is being effectively provided as a part of the integrated management system for NRFs, including the monitoring of the reliability of SSCs, a methodology to detect their ageing, reporting and investigation of events, analysis of their root causes, and measures to prevent and mitigate ageing effects to safety. The report outlines a good practice of safety regulation of NRFs with long operating times and based on lessons learned from experience, including challenges for future improvement of ageing management

  14. Study of a Federal Nuclear Operations Corps

    International Nuclear Information System (INIS)

    1981-12-01

    The staffing requirements of the nuclear electric utility industry will create very large demands in the next 3 years for nuclear trained personnel in operation and maintenance. The commercial nuclear industry recognizes these needs, the importance of having qualified trained personnel, and is taking appropriate action to satisfy these requirements. The education and training capabilities both inside and outside of the utility industry have the capacity to meet these demands if they are properly managed. In particular, the Institute of Nuclear Power Operations Human Resource Management System provides a framework for an organized industry-wide program. The Nuclear Regulatory Commission's Office of Inspection and Enforcement is in effect a Federal Corps focused on nuclear operations. Its Reactor Training Center trains the professionals required to inspect nuclear operations and enforce regulations. Therefore, the Department of Energy (DOE) believes that the objectives of a Federal Nuclear Operations Corps can be met by existing private and Federal efforts and that there is no need to establish another corps or training academy. This is consistent with the Administration's policy of minimizing the Federal role in areas where the private sector is capable

  15. Effects of the DRG-based prospective payment system operated by the voluntarily participating providers on the cesarean section rates in Korea.

    Science.gov (United States)

    Lee, Kwangsoo; Lee, Sangil

    2007-05-01

    This study explored the effects of the diagnosis-related group (DRG)-based prospective payment system (PPS) operated by voluntarily participating organizations on the cesarean section (CS) rates, and analyzed whether the participating health care organizations had similar CS rates despite the varied participation periods. The study sample included delivery claims data from the Korean national health insurance program for the year 2003. Risk factors were identified and used in the adjustment model to distinguish the main reason for CS. Their risk-adjusted CS rates were compared by the reimbursement methods, and the organizations' internal and external environments were controlled. The final risk-adjustment model for the CS rates meets the criteria for an effective model. There were no significant differences of CS rates between providers in the DRG and fee-for-service system after controlling for organizational variables. The CS rates did not vary significantly depending on the providers' DRG participation periods. The results provide evidence that the DRG payment system operated by volunteering health care organizations had no impact on the CS rates, which can lower the quality of care. Although the providers joined the DRG system in different years, there were no differences in the CS rates among the DRG providers. These results support the future expansion of the DRG-based PPS plan to all health care services in Korea.

  16. The tritium operations experience on TFTR

    International Nuclear Information System (INIS)

    Halle, A. von; Anderson, J.L.; Gentile, C.; Grisham, L.; Hosea, J.; Kamperschroer, J.; LaMarche, P.; Oldaker, M.; Nagy, A.; Raftopoulos, S.; Stevenson, T.

    1995-01-01

    The Tokamak Fusion Test Reactor (TFTR) tritium gas system is administratively limited to 5 grams of tritium and provides the feedstock gas for the neutral beam and torus injection systems. Tritium operations on TFTR began with leak checking of gas handling systems, qualification of the gas injection systems, and high power plasma operations using trace amounts of tritium in deuterium feedstock gas. Full tritium operation commenced with four highly diagnosed neutral beam pulses into a beamline calorimeter to verify planned tritium beam operating routines and to demonstrate the deuterium to tritium beam isotope exchange. Since that time, TFTR has successfully operated each of the twelve neutral beam ion sources in tritium during hundreds of tritium beam pulses and torus gas injections. This paper describes the TFTR tritium gas handling systems and TFTR tritium operations of the gas injection systems and the neutral beam ion sources. Tritium accounting and accountability is discussed, including tritium retention issues of the torus limiters and beam impinged surfaces of the beamline components. Also included is tritium beam velocity analysis that compares the neutral beam extracted ion species composition for deuterium and tritium and that determines the extent of beam isotope exchange on subsequent deuterium and tritium beam pulses. The required modifications to TFTR operating routines to meet the U.S. Department of Energy regulations for a low hazard nuclear facility and the problems encountered during initial tritium operations are described. (orig.)

  17. The tritium operations experience on TFTR

    International Nuclear Information System (INIS)

    von Halle, A.; Gentile, C.

    1994-01-01

    The Tokamak Fusion Test Reactor (TFTR) tritium gas system is administratively limited to 5 grains of tritium and provides the feedstock gas for the neutral beam and torus injection systems. Tritium operations on TFTR began with leak checking of gas handling systems, qualification of the gas injection systems, and high power plasma operations using using trace amounts of tritium in deuterium feedstock gas. Full tritium operation commenced with four highly diagnosed neutral beam pulses into a beamline calorimeter to verify planned tritium beam operating routines and to demonstrate the deuterium to tritium beam isotope exchange. Since that time, TFTR has successfully operated each of the twelve neutral beam ion sources in tritium during hundreds of tritium beam pulses and torus gas injections. This paper describes- the TFTR tritium gas handling systems and TFTR tritium operations of the gas injection systems and the neutral beam ion sources. Tritium accounting and accountability is discussed, including tritium retention issues of the torus limiters and beam impinged surfaces of the beamline components. Also included is tritium beam velocity analysis that compares the neutral beam extracted ion species composition for deuterium and tritium and that determines the extent of beam isotope exchange on subsequent deuterium and tritium beam pulses. The required modifications to TFTR operating routines to meet the US Department of Energy regulations for a low hazard nuclear facility and the problems encountered during initial tritium operations are described

  18. 48 CFR 1318.201 - Contingency operation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contingency operation. 1318.201 Section 1318.201 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES EMERGENCY ACQUISITIONS Emergency Acquisition Flexibilities 1318.201 Contingency...

  19. Operational amplifiers

    CERN Document Server

    Dostal, Jiri

    1993-01-01

    This book provides the reader with the practical knowledge necessary to select and use operational amplifier devices. It presents an extensive treatment of applications and a practically oriented, unified theory of operational circuits.Provides the reader with practical knowledge necessary to select and use operational amplifier devices. Presents an extensive treatment of applications and a practically oriented, unified theory of operational circuits

  20. A 0.18 μm CMOS LDO Regulator for an On-Chip Sensor Array Impedance Measurement System.

    Science.gov (United States)

    Pérez-Bailón, Jorge; Márquez, Alejandro; Calvo, Belén; Medrano, Nicolás

    2018-05-02

    This paper presents a fully integrated 0.18 μm CMOS Low-Dropout (LDO) Voltage Regulator specifically designed to meet the stringent requirements of a battery-operated impedance spectrometry multichannel CMOS micro-instrument. The proposed LDO provides a regulated 1.8 V voltage from a 3.6 V to 1.94 V battery voltage over a −40 °C to 100 °C temperature range, with a compact topology (sensors.