WorldWideScience

Sample records for regional electric reliability councils

  1. North American Electric Reliability Council (NERC) Reliability Coordinators

    Data.gov (United States)

    Department of Homeland Security — ERC is an international regulatory authority that works to improve the reliability of the bulk power system in North America. NERC works with many different regional...

  2. Electric power supply and demand 1979 to 1988 for the contiguous United States as projected by the Regional Electric Reliability Councils in their April 1, 1979 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    Savage, N.; Graban, W.

    1979-12-01

    Information concerning bulk electric power supply and demand is summarized and reviewed. Electric-utility power-supply systems are composed of power sources, transmission and distribution facilities, and users of electricity. In the United States there are three such systems of large geographic extent that together cover the entire country. Subjects covered are: energy forecasts, peak demand forecasts, generating-capacity forecasts, purchases and sales of capacity, and transmission. Extensive data are compiled in 17 tables. Information in two appendices includes a general description of the Regional Electric Reliability Councils and US generating capacity as of June 30, 1979. 3 figures, 17 tables.

  3. Electric power supply and demand 1978--1987 for the continuous United States as projected by the Regional Electric Reliability Councils in their April 1, 1978 long-range coordinated planning reports to the Department of Energy

    Energy Technology Data Exchange (ETDEWEB)

    1978-06-15

    The Regional Reliability Council projections of peak demand, generating capability, and electric energy requirements for the contiguous U.S. have declined for the fourth consecutive year. On the basis of these projections, it appears that the electric utility industry believes the U.S. will experience smaller annual increases in power use than have occurred in the past. The summer peak demand growth rates of the Councils range from 3.52 percent annually, as projected by the Northeast Power Coordinating Council, to the 6.21 percent projected by the Southwest Power Pool. Subregional growth covers a wider range, from the 2.77 percent of the New York Power Pool to the 6.51 percent of the Southern Company area. Total reserve margins at the time of summer peak demands are projected to decline from an estimated 30.16 percent in 1978 to about 23.81 percent in 1987. If projected loads are not exceeded, if projected capability levels are actually attained, if fuel requirements are satisfied, and if no contingencies worse than those normally met with are experienced, electric power supply should be adequate for the next decade. However, it is possible that the projected reserve margins will not be attained, and that adequate primary energy supply (fuel and hydro) will not be available when needed. Completion of generating units and transmission facilities on schedule is made uncertain by difficulties related to financing, environmental pressures, procedural delays and some inadequacies with respect to quality control of manufactured and field-assembled components.

  4. Demand participation in the restructured Electric Reliability Council of Texas market

    International Nuclear Information System (INIS)

    Zarnikau, Jay W.

    2010-01-01

    Does an electricity market which has been restructured to foster competition provide greater opportunities for demand response than a traditional regulated utility industry? The experiences of the restructured Electric Reliability Council of Texas (ERCOT) market over the past eight years provide some hope that it is possible to design a competitive market which will properly value and accommodate demand response. While the overall level of demand response in ERCOT is below the levels enjoyed prior to restructuring, there have nonetheless been some promising advances, including the integration of demand-side resources into competitive markets for ancillary services. ERCOT's experiences demonstrate that the degree of demand participation in a restructured market is highly sensitive to the market design. But even in a market which has been deregulated to a large degree, regulatory intervention and special demand-side programs may be needed in order to bolster demand response. (author)

  5. 10 CFR 500.3 - Electric regions-electric region groupings for reliability measurements under the Powerplant and...

    Science.gov (United States)

    2010-01-01

    ... System (APS)—7, except Duquesne Light Company. 2. American Electric Power System (AEP)—entire AEP System... 10 Energy 4 2010-01-01 2010-01-01 false Electric regions-electric region groupings for reliability... of electric regions for use with regard to the Act. The regions are identified by FERC Power Supply...

  6. 18 CFR 39.10 - Changes to an Electric Reliability Organization Rule or Regional Entity Rule.

    Science.gov (United States)

    2010-04-01

    ... RULES CONCERNING CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.10 Changes to an Electric... Reliability Organization Rule or Regional Entity Rule. 39.10 Section 39.10 Conservation of Power and Water...

  7. 76 FR 66057 - North American Electric Reliability Corporation; Order Approving Regional Reliability Standard

    Science.gov (United States)

    2011-10-25

    ... Reliability Standard that is necessitated by a physical difference in the Bulk-Power System.\\7\\ \\7\\ Order No... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g... electric system event analyses and thereby improve system reliability by promoting improved system design...

  8. Assessment and Improving Methods of Reliability Indices in Bakhtar Regional Electricity Company

    Directory of Open Access Journals (Sweden)

    Saeed Shahrezaei

    2013-04-01

    Full Text Available Reliability of a system is the ability of a system to do prospected duties in future and the probability of desirable operation for doing predetermined duties. Power system elements failures data are the main data of reliability assessment in the network. Determining antiseptic parameters is the goal of reliability assessment by using system history data. These parameters help to recognize week points of the system. In other words, the goal of reliability assessment is operation improving and decreasing of the failures and power outages. This paper is developed to assess reliability indices of Bakhtar Regional Electricity Company up to 1393 and the improving methods and their effects on the reliability indices in this network. DIgSILENT Power Factory software is employed for simulation. Simulation results show the positive effect of improving methods in reliability indices of Bakhtar Regional Electricity Company.

  9. Hawaii Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Loose, Verne William [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Silva Monroy, Cesar Augusto [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2012-08-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers’ views of reliability “worth” and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers’ views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  10. Hawaii electric system reliability.

    Energy Technology Data Exchange (ETDEWEB)

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  11. INCREASED RELIABILITY OF ELECTRIC BLASTING

    OpenAIRE

    Kashuba, Oleh Ivanovych; Skliarov, L I; Skliarov, A L

    2017-01-01

    The problems of improving reliability of an electric blasting method using electric detonators with nichrome filament bridges. It was revealed that in the calculation of the total resistance of the explosive network it is necessary to increase to 24% of the nominal value

  12. Electricity Sector Council : human resources challenges

    Energy Technology Data Exchange (ETDEWEB)

    Goldie, T. [Electricity Sector Council, Ottawa, ON (Canada)

    2007-07-01

    The electricity sector is currently undergoing significant human resource challenges. Several charts illustrated the aging Canadian workforce; workforce by key occupation; statistics on a 2004 sector study requirements of retirement estimations; and average annual growth rate of the domestic labour force. Several slides also depicted the dependence on immigrants for labour growth; trades intake through immigration; and a 2007 environmental scan. The presentation also provided information on the Electricity Sector Council (ESC) and its projects and occupational standards currently under development. The ESC in partnership with Human Resources and Social Development Canada has begun the process of developing a National Occupational Standard for geoexchange professionals. It is intended to enable colleges and Ministries of Education to standardize national training and evaluate new hires. Last, several slides containing background information on the ESC board of directors were included along with slides of labour market information; connectivity; and projects under development. tabs., figs.

  13. Electricity Sector Council : human resources challenges

    International Nuclear Information System (INIS)

    Goldie, T.

    2007-01-01

    The electricity sector is currently undergoing significant human resource challenges. Several charts illustrated the aging Canadian workforce; workforce by key occupation; statistics on a 2004 sector study requirements of retirement estimations; and average annual growth rate of the domestic labour force. Several slides also depicted the dependence on immigrants for labour growth; trades intake through immigration; and a 2007 environmental scan. The presentation also provided information on the Electricity Sector Council (ESC) and its projects and occupational standards currently under development. The ESC in partnership with Human Resources and Social Development Canada has begun the process of developing a National Occupational Standard for geoexchange professionals. It is intended to enable colleges and Ministries of Education to standardize national training and evaluate new hires. Last, several slides containing background information on the ESC board of directors were included along with slides of labour market information; connectivity; and projects under development. tabs., figs.

  14. 75 FR 15371 - Time Error Correction Reliability Standard

    Science.gov (United States)

    2010-03-29

    ... Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers. As the independent system operator for the region, ERCOT schedules power on an electric grid that... Coordinating Council (WECC) is responsible for coordinating and promoting bulk electric system reliability in...

  15. 78 FR 7773 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Science.gov (United States)

    2013-02-04

    ... Board of Trustees Meetings, Board of Trustees Compliance Committee, Corporate Governance and Human Resources Committee, and Standards Oversight and Technology Committee Meetings. Hotel del Coronado, 1500... Association, Inc. v. Western Electric Coordinating Council and North American Electric Reliability Corporation...

  16. Reliability risks during the transition to competitive electricity markets

    International Nuclear Information System (INIS)

    Hughes, J.P.

    2005-01-01

    The Electricity Consumers Resource Council (ELCON) is a U.S. association representing industrial consumers of electricity, and is a long-standing advocate of competition in the electric power industry. However, because a reliable grid is necessary to support competitive wholesale markets, ELCON believes that the transmission system is an essential facility that must remain regulated. The initiatives discussed in this white paper represent significant steps that the National Electric Reliability Council (NERC) and the industry have taken to improve reliability in a competitive and restructured electric industry. Strategic manoeuvres of incumbent utilities to maintain market share were evaluated, as well as discrimination against potential competitors. It was suggested that, occasionally, indecisive federal policies have been taken advantage of by utilities. The unintended consequences of state restructuring policies that allow utilities to over-earn their revenue requirements were reviewed. NERC reliability standards will remain unenforceable until a new Electricity Reliability Organization has been certified. Flawed market designs and inadequate market power mitigation, as well as the financial distress of merchant generators, pose considerable risks. It was suggested that these risks could trigger transmission loading relief incidents, local outages or widespread outages. In the absence of mandatory reliability standards with penalties, and complementary market rules for mitigating generation and transmission market power, economic incentives will encourage other forms of opportunistic behavior that may be the root cause of other outages. Public concern regarding these risks to grid reliability may result in lost public support for competitive electricity markets. Proposed solutions include the certification of a new Electric Reliability Organization to establish and enforce mandatory reliability standards, and granting the Federal Energy Regulatory Commission

  17. Generating solutions : summary of the Electricity Sector Council's review of foreign credential recognition

    International Nuclear Information System (INIS)

    2008-03-01

    The Electricity Sector Council has recognized the increasing requirement to recruit and retain internationally trained workers to offset the anticipated retirement of up to 40 per cent of skilled workers in this sector by 2014. This document provided a brief summary of the review of foreign credential recognition in Canada's Electricity Council which was prepared in February 2008. The purpose of the study was to capture a perceptive picture of Canada's electricity labour force and to assist the Electricity Sector Council in the potential development and implementation of strategies to facilitate the integration of internationally trained workers into Canada's electricity sector. This synopsis report presented the analysis of the study including a discussion of immigration trends; foreign credential recognition in Canada's electricity sector; immigration profiles by region; case study profiles; and recommendations. It was recommended that resources be researched, developed and provided in order to help stakeholders attract, recruit, retain and integrate internationally trained workers. 2 refs

  18. Green power. Renewable electricity purchasing by Leicester City Council

    International Nuclear Information System (INIS)

    2000-05-01

    This case study describes the use of renewable energy by Leicester City Council in the East Midlands. The Council, which has a long-term commitment to sustainable energy and the environment, employs over 14,000 people. A contract was first negotiated with East Midlands Electricity (now PowerGen) to supply the Council's New Walk Centre with green electricity in 1995. Some of the green energy is supplied by the Milford Mill hydroelectric plant. Use of building energy monitoring systems (BEMSs) and other good practice has allowed the Council to achieve a 20% saving in its electricity bill. The Council has also negotiated contracts to supply two smaller sites (a recycling facility called Planet Works and the city's Energy Efficiency centre) with green electricity generated by Beacon Energy, a small renewable energy company which operates two 25 kW wind turbines and two 3 kW arrays of photovoltaic cells at a site some 15 miles from Leicester. The exemption given to renewable energy from the climate change levy makes these schemes even more economic; a worked example is provided to demonstrate the impact of the climate change levy on electricity costs at the New Walk Centre. Six steps to follow when seeking to connect to green electricity are advised

  19. Did Geomagnetic Activity Challenge Electric Power Reliability During Solar Cycle 23? Evidence from the PJM Regional Transmission Organization in North America

    Science.gov (United States)

    Forbes, Kevin F.; Cyr, Chris St

    2012-01-01

    During solar cycle 22, a very intense geomagnetic storm on 13 March 1989 contributed to the collapse of the Hydro-Quebec power system in Canada. This event clearly demonstrated that geomagnetic storms have the potential to lead to blackouts. This paper addresses whether geomagnetic activity challenged power system reliability during solar cycle 23. Operations by PJM Interconnection, LLC (hereafter PJM), a regional transmission organization in North America, are examined over the period 1 April 2002 through 30 April 2004. During this time PJM coordinated the movement of wholesale electricity in all or parts of Delaware, Maryland, New Jersey, Ohio, Pennsylvania, Virginia, West Virginia, and the District of Columbia in the United States. We examine the relationship between a proxy of geomagnetically induced currents (GICs) and a metric of challenged reliability. In this study, GICs are proxied using magnetometer data from a geomagnetic observatory located just outside the PJM control area. The metric of challenged reliability is the incidence of out-of-economic-merit order dispatching due to adverse reactive power conditions. The statistical methods employed make it possible to disentangle the effects of GICs on power system operations from purely terrestrial factors. The results of the analysis indicate that geomagnetic activity can significantly increase the likelihood that the system operator will dispatch generating units based on system stability considerations rather than economic merit.

  20. The impact of carbon taxes or allowances on the electric generation market in the Ohio and ECAR region

    International Nuclear Information System (INIS)

    Hadley, S.W.

    1998-07-01

    The North American electricity grid is separated into 11 regional reliability councils, collectively called the North American Electric Reliability Council (NERC). The East Central Area Reliability Coordination Agreement (ECAR) is the reliability council that covers Ohio and Indiana, along with parts of Kentucky, Illinois, Maryland, Michigan, Pennsylvania, Virginia, and West Virginia. Ohio and the rest of the ECAR region rely more heavily on coal-fired generation than any other US region. The purpose of this report is to study the effect of carbon reduction policies on the cost and price of generation in the ECAR region, with an emphasis on Ohio. In order to do that, the author modeled the possible electric generation system for the ECAR and Ohio region for the year 2010 using a model developed at Oak Ridge National Laboratory called the Oak Ridge Competitive Electric Dispatch model (ORCED). He let the model optimize the system based on various factors and carbon reduction policies to understand their impact. He then used the electricity prices and assumed demand elasticities to change the demands while also requiring all power plants to be profitable. The author discusses the different potential policies for carbon reduction and issues involving a restructured market; describes the model used for this analysis, the ECAR electricity sector, and the establishment of a base case; and describes the results of applying various carbon emission reduction approaches to the region. 14 figs., 5 tabs

  1. 78 FR 41339 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Science.gov (United States)

    2013-07-10

    ...] Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards AGENCY: Federal... Reliability Standards identified by the North American Electric Reliability Corporation (NERC), the Commission-certified Electric Reliability Organization. FOR FURTHER INFORMATION CONTACT: Kevin Ryan (Legal Information...

  2. Comments of Dr. John A. Anderson, executive director of the Electricity Consumers Resource Council

    International Nuclear Information System (INIS)

    Anderson, J.A.

    1998-01-01

    The Electricity Consumers Resource Council (ELCON)'s view of the need for deregulation, and the advantages and pitfalls of deregulation were discussed, based on the experience of some large electric power customers in the United States. ELCON is a US group of 37 large industrial electricity consumers that was created to promote the development and adaption of rational federal and state policies that assure an adequate, reliable and efficient electricity supply at competitive prices. ELCON's member companies operate more than 650 different facilities in the US. ELCON strongly believes that restructuring will greatly benefit consumers, mainly by giving them choices. The Council is dedicated to ensuring that US electric utilities become utilities with real competition and not unregulated monopolies. In the past, electricity consumers have encountered several problems with the traditional rate regulation of electric utilities. These problems have driven many large industrial and commercial customers to find ways to reduce their electric bills through options such as self-generation, alternative hook-ups, municipalization, loopholes and fuel switching. These options themselves have created some additional problems. The most obvious of these is that when these large electricity consumers depart from the local utility, they stop paying their share of previously-incurred costs which the remaining customers must pay, which forces prices even higher. The need to regulate transmission and distribution as long as there are natural monopolies was discussed. It was suggested that transmission grids should be operated by Independent System Operators (ISOs) who have no financial interests in market transactions

  3. 78 FR 71448 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Science.gov (United States)

    2013-11-29

    ...; Order No. 789] Regional Reliability Standard BAL-002-WECC-2--Contingency Reserve AGENCY: Federal Energy... (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and Western Electricity... Region and is meant to specify the quantity and types of [[Page 71449

  4. 36 CFR 242.11 - Regional advisory councils.

    Science.gov (United States)

    2010-07-01

    ... SUBSISTENCE MANAGEMENT REGULATIONS FOR PUBLIC LANDS IN ALASKA Program Structure § 242.11 Regional advisory... participate in the Federal subsistence management program. The Regional Councils shall be established, and... the members represent commercial and sport interests within a region. The portion of membership that...

  5. 75 FR 14097 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2010-03-24

    ... electrical failure of a 138 kV motor operated switch on a 138 kV-13 kV transformer located in the ReliabilityFirst region resulted in the tripping of two transformers, one due to the electrical failure and the... Commission 18 CFR Part 40 [Docket No. RM09-18-000; 130 FERC ] 61,204] Revision to Electric Reliability...

  6. Generating solutions : summary of the Electricity Sector Council's review of foreign credential recognition

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-03-15

    The Electricity Sector Council has recognized the increasing requirement to recruit and retain internationally trained workers to offset the anticipated retirement of up to 40 per cent of skilled workers in this sector by 2014. This document provided a brief summary of the review of foreign credential recognition in Canada's Electricity Council which was prepared in February 2008. The purpose of the study was to capture a perceptive picture of Canada's electricity labour force and to assist the Electricity Sector Council in the potential development and implementation of strategies to facilitate the integration of internationally trained workers into Canada's electricity sector. This synopsis report presented the analysis of the study including a discussion of immigration trends; foreign credential recognition in Canada's electricity sector; immigration profiles by region; case study profiles; and recommendations. It was recommended that resources be researched, developed and provided in order to help stakeholders attract, recruit, retain and integrate internationally trained workers. 2 refs.

  7. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Science.gov (United States)

    2011-09-20

    ....C. Cir. 2009). \\4\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC... for maintaining real and reactive power balance. \\14\\ Electric Reliability Organization Interpretation...; Order No. 753] Electric Reliability Organization Interpretation of Transmission Operations Reliability...

  8. 18 CFR 375.303 - Delegations to the Director of the Office of Electric Reliability.

    Science.gov (United States)

    2010-04-01

    ... Director of the Office of Electric Reliability. 375.303 Section 375.303 Conservation of Power and Water... Delegations § 375.303 Delegations to the Director of the Office of Electric Reliability. The Commission... Electric Reliability Organization or Regional Entity rules or procedures; (ii) Reject an application...

  9. Ca Biodiversity Council Bioregions (INACC Regions)

    Data.gov (United States)

    California Natural Resource Agency — California regions developed by the Inter-agency Natural Areas Coordinating Committee (INACC) were digitized from a 1:1,200,000 California Department of Fish and...

  10. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.

  11. The Regional Advisory Councils' current capacities and unforeseen benefits

    DEFF Research Database (Denmark)

    Ounanian, Kristen; Hegland, Troels Jacob

    2012-01-01

    The 2002 Common Fisheries Policy (CFP) reform introduced the Regional Advisory Councils (RACs) to enhance stakeholder involvement and correct one of the policy's primary deficiencies, its lack of legitimacy, arising in part from low stakeholder involvement. While some criticize the 2002 reform as...

  12. Citizen Advisory Council use in the electric utility industry

    International Nuclear Information System (INIS)

    McElfresh, R.W.

    1991-01-01

    Many electric utility companies have come to realize the Importance of seeking public input before launching corporate resources into major construction projects. One way to organize this input is to establish a Citizen Advisory Council (CAC). This paper describes the purpose of such a group, its advantages and limitations, and how it might be organized. This paper also describes the results of a survey of CAC use for facility siting purposes. Fifty large utility companies were contacted, eleven of which use CACs for siting purposes. Six of these were questioned in greater detail as to their success in using CACs on specific projects. All companies were positive about the use of CACs for public participation because the groups were able to bring valuable information to light and company credibility was enhanced. Most importantly, the responding companies believed they were able to save time in the siting and licensing process

  13. Reliability planning in distributed electric energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.

    1978-10-01

    The goal of this paper is to develop tools for technology evaluation that address questions involving the economics of large-scale systems. The kind of cost discussed usually involves some dynamic aspect of the energy system. In particular, such properties as flexibility, stability, and resilience are features of entire systems. Special attention must be paid to the question of reliability, i.e., availability on demand. The storage problem and the planning for reliability in utility systems are the subjects of this paper. The introductory chapter addresses preliminary definitions--reliability planning, uncertainty, resilience, and other sensitivities. The study focuses on the contrast between conventional power generation technologies with controllable output and intermittent resources such as wind and solar electric conversion devices. The system studied is a stylized representation of California conditions. Significant differences were found in reliability planning requirements (and therefore costs) for systems dominated by central station plants as opposed to those dominated by intermittent resource technologies. It is argued that existing hydroelectric facilities need re-optimization. These plants provide the only currently existing bulk power storage in electric energy systems. 38 references. (MCW)

  14. More efficient policy of energy and regional electricity supply by the directive 96/92/EC of the European Parliament and of the Council of 10 december 1996 concerning common rules for the internal market in electricity; Effizientere Energiepolitik und regionale Elektrizitaetsversorgung durch die EU-Elektrizitaetsrichtlinie 1996. Politikfeldanalyse der europaeischen, deutschen und bayerischen Energiepolitik und Elektrizitaetswirtschaft im Zusammenhang mit der Entstehung und Umsetzung der EU-Richtlinie 96 sowie der Veraenderung der Effizienz in der traditionellen Elektrizitaetsversorgung unter supranationalem EU-Einfluss

    Energy Technology Data Exchange (ETDEWEB)

    Furtner, Franz

    2006-07-01

    The German energy policy and its main addressees, the regional electricity companies (EVU), are going through a critical phase at the beginning of the 21st century. The increasing complexity and inconsistency of energy issues have, in Germany and in other countries, led to decisions which again have produced extensive, but not yet foreseeable developments, as, for example, the liberalisation of the electricity and gas market within the European Union. The first objective of this paper is an empirical analysis of the regional electricity supply industry in Germany and particularly in Bavaria in so far as it is relevant for energy politics, as well as an introduction to the German energy policy up to approximately the time when the Directive 96/92/EC of the European Parliament and the Council of 19 December 1996 concerning common rules for the internal market in electricity, was passed. Moreover, findings for the definition of energy efficiency in electricity supply and of the policy analysis are outlined. The second objective of this paper is the analysis and evaluation of the European Union energy policy, in particular of the Directive 96/92/EC, its formation and how it has been put into action by the German and Bavarian electricity supply industry. Energy efficiency of the electricity supply serves as a yardstick, the research method employed is the policy analysis. The main part of this paper, by comparing objectives to effects and by evaluating interviews with energy experts, examines the questions if, in what ways and to what extent the Directive 96/92/EC has led to an increase of energy efficiency in the narrow as well as in the boarder sense, within the EU, Germany and Bavaria. Additionally, three hypotheses are tested: firstly the significance of energy efficiency (in the narrow sense), secondly the alignment of European energy supply, and thirdly the importance of supranational control through EU politics. The results are presented in tabular form, and the

  15. Novel approach for evaluation of service reliability for electricity customers

    Institute of Scientific and Technical Information of China (English)

    JIANG; John; N

    2009-01-01

    Understanding reliability value for electricity customer is important to market-based reliability management. This paper proposes a novel approach to evaluate the reliability for electricity customers by using indifference curve between economic compensation for power interruption and service reliability of electricity. Indifference curve is formed by calculating different planning schemes of network expansion for different reliability requirements of customers, which reveals the information about economic values for different reliability levels for electricity customers, so that the reliability based on market supply demand mechanism can be established and economic signals can be provided for reliability management and enhancement.

  16. 76 FR 73608 - Reliability Technical Conference, North American Electric Reliability Corporation, Public Service...

    Science.gov (United States)

    2011-11-29

    ... or municipal authority play in forming your bulk power system reliability plans? b. Do you support..., North American Electric Reliability Corporation (NERC) Nick Akins, CEO of American Electric Power (AEP..., EL11-62-000] Reliability Technical Conference, North American Electric Reliability Corporation, Public...

  17. Alberta's electricity policy framework : competitive, reliable, sustainable

    International Nuclear Information System (INIS)

    2005-01-01

    This paper described public policies in Alberta that are implemented to create an electric power industry that is competitive, reliable and sustainable. The success of Alberta's competitive electric market framework can be attributed to new investment in the industry along with new players participating in the electricity market. The Alberta Department of Energy is committed to a competitive wholesale market model and to competitively-priced electricity. The Alberta Energy and Utilities Board supports the development of Alberta's vast resource base and facilitates power generation development and support through transmission development and an interconnected transmission system. A wholesale market Policy Task Force was established in 2005 to review the progress in Alberta's electric market design and its competitive retail market. This paper outlines a policy framework which addresses design of the regulated rate option post July 1, 2006; short-term adequacy; and long-term adequacy. Other inter-related market issues were also discussed, such as operating reserves market, transmission services, interties, demand response, balancing pool assets, credit, market power mitigation, and wind generation. It is expected that the recommendations in this paper will be implemented as quickly as possible following amendments to regulations or ISO rules. tabs., figs.

  18. Will British weather provide reliable electricity?

    International Nuclear Information System (INIS)

    Oswald, James; Raine, Mike; Ashraf-Ball, Hezlin

    2008-01-01

    There has been much academic debate on the ability of wind to provide a reliable electricity supply. The model presented here calculates the hourly power delivery of 25 GW of wind turbines distributed across Britain's grid, and assesses power delivery volatility and the implications for individual generators on the system. Met Office hourly wind speed data are used to determine power output and are calibrated using Ofgem's published wind output records. There are two main results. First, the model suggests that power swings of 70% within 12 h are to be expected in winter, and will require individual generators to go on or off line frequently, thereby reducing the utilisation and reliability of large centralised plants. These reductions will lead to increases in the cost of electricity and reductions in potential carbon savings. Secondly, it is shown that electricity demand in Britain can reach its annual peak with a simultaneous demise of wind power in Britain and neighbouring countries to very low levels. This significantly undermines the case for connecting the UK transmission grid to neighbouring grids. Recommendations are made for improving 'cost of wind' calculations. The authors are grateful for the sponsorship provided by The Renewable Energy Foundation

  19. 75 FR 31418 - Intermountain Region, Payette National Forest, Council Ranger District; Idaho; Mill Creek-Council...

    Science.gov (United States)

    2010-06-03

    ... Ranger District; Idaho; Mill Creek--Council Mountain Landscape Restoration Project AGENCY: Forest Service... the Mill Creek--Council Mountain Landscape Restoration Project. The approximate 51,900 acre project area is located about two miles east of Council, Idaho. The Mill Creek--Council Mountain Landscape...

  20. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  1. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  2. 18 CFR 39.3 - Electric Reliability Organization certification.

    Science.gov (United States)

    2010-04-01

    ... operators of the Bulk-Power System, and other interested parties for improvement of the Electric Reliability... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Electric Reliability..., Reliability Standards that provide for an adequate level of reliability of the Bulk-Power System, and (2) Has...

  3. Regional impacts of expanding gas-fired electric generation in the northeast US and eastern Canada

    International Nuclear Information System (INIS)

    Mitchell, G.

    2002-01-01

    New York, New England, Ontario, Quebec and Canada's Maritime provinces come under the jurisdiction of the Northeast Power Coordinating Committee (NPCC) of the North American Electric Reliability Council (NERC). The objective of this Council is to assist with the coordination of electric supply, as well as transmission planning and reliability for the utilities. The annual ten year forecast of electric supply, demand and fuel sources produced by the NERC formed the basis for the data presented. The deregulation of the electricity market in a few jurisdictions in the region resulted in the break-up of several electric utilities into their core components, namely, generation, distribution and transmission. The generation sector is where the fastest break-up activity is taking place, and merchant energy companies are emerging. Each of these merchant energy companies is competing against the other to effect sales into the wholesale power market through the building of at risk generation plants. The deregulation process is subjected to different processes and time tables depending on each state or province regulations. The construction of new power plants in the region is being driven by the merchant energy companies. They are building low capital cost and highly efficient natural gas combined-cycle base load plants as well as lower cost and moderately efficient natural gas/oil-fired simple-cycle peaking plants. This activity is mainly restricted to the United States, since hydroelectric power, coal and nuclear power are the main presence in Canada. New England experiences summer peaks while Canada has winter peak electric demand. To optimize intra-regional peak generation capacity sharing, there is an opportunity for the electric industry to move gas by wire, and a number of projects are being developed. It is expected that pipeline expansion will be lower in Quebec and Ontario and result in more capacity expansions from the Maritimes combined with intra-regional

  4. 77 FR 39858 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2012-07-05

    ... bulk electric system reliability through steady state power flow, and contain a transient stability... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... definition of ``bulk electric system'' developed by the North American Electric Reliability Corporation (NERC...

  5. Approach to valuing visual pollution from Western Electricity Production. [For Western Systems Coordinating Council area

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, L.E.

    1977-02-01

    This paper outlines an approach to valuing visual pollution from electric power plants. The differences between public-good pollution externalities, such as these aesthetic damages, and other market failures are discussed. Approaches generally used to value externalities are briefly described. The approach used relies heavily on an earlier application of bidding games to estimate people's willingness to pay for abatement of emissions from the Four Corners fossil-fuel power plant in northwestern New Mexico. The results of these surveys were used here to estimate the value of visual pollution from electric power plants for residents of and visitors to the Four Corners Air Quality Control Region, as a function of power plant emissions in that region. The approach presented here for the Four Corners region is structured so that replication for other air quality control regions is relatively easy. Preliminary results of this procedure for all of the air quality control regions in the Western Systems Coordinating Council area are presented. Visual pollution damages from electric power plants to residents of and recreational visitors to these western regions are estimated to total more than $100 million annually by 1985. These damages are expected to occur unless additional pollution controls are implemented, even if these subject populations do not increase.

  6. Region-specific study of the electric utility industry. Phase I, final report

    International Nuclear Information System (INIS)

    Wacaster, A.J.

    1985-07-01

    This report describes the financial background of the electric utility industry in VACAR, reports on the present condition of the industry and then assesses the future of this industry. The Virginia-Carolinas subregion (VACAR) of the Southeastern Electric Reliability Council (SERC) was selected for this regional study because of its cooperativeness and its representative mix of powerplants, for example coal, hydro, nuclear, oil. It was found that the supply of future economic electricity is in jeopardy because of the regulatory process, the increasing risk associated with large scale generating stations and the weakening of the nuclear option. A number of options for the future were considered, including deregulation, government ownership and retaining the present system with modifications. The option selected to improve the present condition of the electricity industry was to make the present system work. The present system is sound, and with modifications, problems could be solved within the existing framework. 8 figs., 4 tabs

  7. Research on the Reliability Testing of Electrical Automation Control Equipment

    OpenAIRE

    Yongjie Luo

    2014-01-01

    According to the author’s many years’ work experience, this paper first discusses the concepts of electrical automation control equipment reliability testing, and then analyzes the test method of electrical automation control equipment reliability testing, finally, on this basis, this article discusses how to determine the reliability test method of electrical automation control equipment. Results of this study will provide a useful reference for electrical automation control equipment reliab...

  8. Highlights from the Electricity Sector Council's powerline technician project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-05-15

    The Electricity Sector Council completed a situational analysis of the powerline technician trade in Canada in April 2008. The purpose of the study was to provide industry partners with the opportunity to provide input into the development of the powerline trade; to assess the current workforce; to examine training and working conditions based on in-depth focus group interviews; and to demonstrate regional and provincial differences in apprenticeship development. This report presented highlights from the Electricity Sector Council's powerline technician project. Specifically, the report discussed the number of powerline apprentices entering the trade; regional differences in the powerline trade; and emerging practices for recruitment, retention, and training. Recommendations were also offered in order to address the challenges faced by the powerline trade. It was concluded that the best ways to recruit candidates in the powerline technician trade are to invest in a word-of mouth campaign, such as a coaching program; encourage early introduction to the trades through job sampling; offer financial incentives; and invest in outreach programs. 4 figs.

  9. 76 FR 23171 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2011-04-26

    ... Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242, order on reh'g...-Power System reliability may request an interpretation of a Reliability Standard.\\7\\ The ERO's standards... information in its reliability assessments. The Reliability Coordinator must monitor Bulk Electric System...

  10. 76 FR 66055 - North American Electric Reliability Corporation; Order Approving Interpretation of Reliability...

    Science.gov (United States)

    2011-10-25

    ...\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242... materially affected'' by Bulk-Power System reliability may request an interpretation of a Reliability... Electric Reliability Corporation; Order Approving Interpretation of Reliability Standard; Before...

  11. 75 FR 72909 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2010-11-26

    ... Bulk-Power System. See Rules Concerning Certification of the Electric Reliability Organization; and... Bulk-Power System in North America because it protects the reliability of the bulk electric system and... Electric Reliability Organization Definition of Bulk Electric System; Final Rule #0;#0;Federal Register...

  12. 78 FR 29209 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2013-05-17

    ... Commission 18 CFR Part 40 Revisions to Electric Reliability Organization Definition of Bulk Electric System... local distribution'' as set forth in the Federal Power Act (FPA). \\1\\ Revisions to Electric Reliability... Reliability Organization Definition of Bulk Electric System, Order No. 743, 133 FERC ] 61,150, at P 16 (2010...

  13. 76 FR 16263 - Revision to Electric Reliability Organization Definition of Bulk Electric System

    Science.gov (United States)

    2011-03-23

    ...; Order No. 743-A] Revision to Electric Reliability Organization Definition of Bulk Electric System AGENCY... certain provisions of the Final Rule. Order No. 743 directed the Electric Reliability Organization (ERO) to revise the definition of the term ``bulk electric system'' through the ERO's Reliability Standards...

  14. Measuring international electricity integration: a comparative study of the power systems under the Nordic Council, MERCOSUR, and NAFTA

    International Nuclear Information System (INIS)

    Pineau, P.-O.; Hira, Anil; Froschauer, Karl

    2004-01-01

    Many regions of the world feel the pressure to interconnect electric power systems internationally. Regional integrations of the electricity sector have become part of free trade and common market initiatives, though the steps individual national jurisdictions take towards developing integrated systems vary. In this article, we review three regions concerned with common market initiatives and at different stages of integration processes that involve infrastructural, regulatory, and commercial decisions. First, we examine the North European countries in the Nordic Council, then countries in the Southern Cone of South America in MERCOSUR, and finally Mexico, the United States and Canada, linked under NAFTA. This comparative study highlights the potential, but also the many hurdles, that electricity sector integrations face. The study suggests a framework for measuring the level of electricity sector integration that could be applied to other regions

  15. Consortium for Electric Reliability Technology Solutions Grid of the Future White Paper on Review of Recent Reliability Issues and Systems Events

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, John F.; Dagle, Jeffery E.

    1999-12-01

    This report is one of six reports developed under the U.S. Department of Energy (DOE) program in Power System Integration and Reliability (PSIR). The objective of this report is to review, analyze, and evaluate critical reliability issues demonstrated by recent disturbance events in the North America power system. Eleven major disturbances are examined, most occurring in this decade. The strategic challenge is that the pattern of technical need has persisted for a long period of time. For more than a decade, anticipation of market deregulation has been a major disincentive to new investments in system capacity. It has also inspired reduced maintenance of existing assets. A massive infusion of better technology is emerging as the final option to continue reliable electrical services. If an investment in better technology will not be made in a timely manner, then North America should plan its adjustments to a very different level of electrical service. It is apparent that technical operations staff among the utilities can be very effective at marshaling their forces in the immediate aftermath of a system emergency, and that serious disturbances often lead to improved mechanisms for coordinated operation. It is not at all apparent that such efforts can be sustained through voluntary reliability organizations in which utility personnel external to those organizations do most of the technical work. The eastern interconnection shows several situations in which much of the technical support has migrated from the utilities to the Independent System Operator (ISO), and the ISO staffs or shares staff with the regional reliability council. This process may be a natural and very positive consequence of utility restructuring. If so, the process should be expedited in regions where it is less advanced.

  16. 76 FR 23222 - Electric Reliability Organization Interpretation of Transmission Operations Reliability

    Science.gov (United States)

    2011-04-26

    ....3d 1342 (DC Cir. 2009). \\5\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693... Reliability Standards for the Bulk-Power System. Action: FERC-725A. OMB Control No.: 1902-0244. Respondents...] Electric Reliability Organization Interpretation of Transmission Operations Reliability AGENCY: Federal...

  17. Potential for deserts to supply reliable renewable electric power

    Science.gov (United States)

    Labordena, Mercè; Lilliestam, Johan

    2015-04-01

    To avoid dangerous climate change, the electricity systems must be decarbonized by mid-century. The world has sufficient renewable electricity resources for complete power sector decarbonization, but an expansion of renewables poses several challenges for the electricity systems. First, wind and solar PV power are intermittent and supply-controlled, making it difficult to securely integrate this fluctuating generation into the power systems. Consequently, power sources that are both renewable and dispatchable, such as biomass, hydro and concentrating solar power (CSP), are particularly important. Second, renewable power has a low power density and needs vast areas of land, which is problematic both due to cost reasons and due to land-use conflicts, in particular with agriculture. Renewable and dispatchable technologies that can be built in sparsely inhabited regions or on land with low competition with agriculture would therefore be especially valuable; this land-use competition greatly limits the potential for hydro and biomass electricity. Deserts, however, are precisely such low-competition land, and are at the same time the most suited places for CSP generation, but this option would necessitate long transmission lines from remote places in the deserts to the demand centers such as big cities. We therefore study the potential for fleets of CSP plants in the large deserts of the world to produce reliable and reasonable-cost renewable electricity for regions with high and/or rapidly increasing electricity demand and with a desert within or close to its borders. The regions in focus here are the European Union, North Africa and the Middle East, China and Australia. We conduct the analysis in three steps. First, we identify the best solar generation areas in the selected deserts using geographic information systems (GIS), and applying restrictions to minimize impact on biodiversity, soils, human heath, and land-use and land-cover change. Second, we identify

  18. 76 FR 1187 - Application for Recertification of Prince William Sound Regional Citizens' Advisory Council

    Science.gov (United States)

    2011-01-07

    ... Prince William Sound Regional Citizens' Advisory Council AGENCY: Coast Guard, DHS. ACTION: Notice of... on, the application for recertification submitted by the Prince William Sound Regional Citizen's... advisory group in lieu of a Regional Citizens' Advisory Council for Prince William Sound, Alaska. This...

  19. 75 FR 16204 - Region II Buffalo District Advisory Council; Public Meeting

    Science.gov (United States)

    2010-03-31

    ... SMALL BUSINESS ADMINISTRATION Region II Buffalo District Advisory Council; Public Meeting AGENCY... meeting of the Region II Buffalo District Advisory Council. The meeting will be open to the public. DATES... Federal Advisory Committee Act (5 U.S.C., Appendix 2), SBA announces the meeting of the Region II Buffalo...

  20. 77 FR 20871 - Region II Buffalo District Advisory Council; Public Meeting

    Science.gov (United States)

    2012-04-06

    ... SMALL BUSINESS ADMINISTRATION Region II Buffalo District Advisory Council; Public Meeting AGENCY... meeting of the Region II Buffalo District Advisory Council. The meeting will be open to the public. DATES... Committee Act (5 U.S.C., Appendix 2), SBA announces the meeting of the Region II Buffalo District Advisory...

  1. 76 FR 59480 - Region II Buffalo District Advisory Council; Public Meeting

    Science.gov (United States)

    2011-09-26

    ... SMALL BUSINESS ADMINISTRATION Region II Buffalo District Advisory Council; Public Meeting AGENCY... meeting of the Region II Buffalo District Advisory Council. The meeting will be open to the public. DATES... Federal Advisory Committee Act (5 U.S.C., Appendix 2), SBA announces the meeting of the Region II Buffalo...

  2. The Role of Demand Resources In Regional Transmission Expansion Planning and Reliable Operations

    Energy Technology Data Exchange (ETDEWEB)

    Kirby, Brendan J [ORNL

    2006-07-01

    Investigating the role of demand resources in regional transmission planning has provided mixed results. On one hand there are only a few projects where demand response has been used as an explicit alternative to transmission enhancement. On the other hand there is a fair amount of demand response in the form of energy efficiency, peak reduction, emergency load shedding, and (recently) demand providing ancillary services. All of this demand response reduces the need for transmission enhancements. Demand response capability is typically (but not always) factored into transmission planning as a reduction in the load which must be served. In that sense demand response is utilized as an alternative to transmission expansion. Much more demand response is used (involuntarily) as load shedding under extreme conditions to prevent cascading blackouts. The amount of additional transmission and generation that would be required to provide the current level of reliability if load shedding were not available is difficult to imagine and would be impractical to build. In a very real sense demand response solutions are equitably treated in every region - when proposed, demand response projects are evaluated against existing reliability and economic criteria. The regional councils, RTOs, and ISOs identify needs. Others propose transmission, generation, or responsive load based solutions. Few demand response projects get included in transmission enhancement plans because few are proposed. But this is only part of the story. Several factors are responsible for the current very low use of demand response as a transmission enhancement alternative. First, while the generation, transmission, and load business sectors each deal with essentially the same amount of electric power, generation and transmission companies are explicitly in the electric power business but electricity is not the primary business focus of most loads. This changes the institutional focus of each sector. Second

  3. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    Directory of Open Access Journals (Sweden)

    Mark Ndubuka NWOHU

    2007-09-01

    Full Text Available The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. This paper presents an economic framework that can be used to optimize electric power system reliability. Finally the cost models are investigated to take into account the economic analysis of system reliability, which can be periodically updated to improve overall reliability of electric power system.

  4. Improvement of standards on functional reliability of electric power systems

    International Nuclear Information System (INIS)

    Barinov, V.A.; Volkov, G.A.; Kalita, V.V.; Kogan, F.L.; Makarov, S.F.; Manevich, A.S.; Mogirev, V.V.; Sin'chugov, F.I.; Skopintsev, V.A.; Khvoshchinskaya, Z.G.

    1993-01-01

    Analysis of the most principal aspects of the existing standards and requirements on assuring safety and stability of electric power systems (EPS) and effective (reliable and economical) power supply of consumers is given. The reliability is determined as ability to accomplish the assigned functions. Basic recommendations on improving the standards regulating the safety and reliability of the NPP functioning are formulated

  5. Demand Response Application forReliability Enhancement in Electricity Market

    OpenAIRE

    Romera Pérez, Javier

    2015-01-01

    The term reliability is related with the adequacy and security during operation of theelectric power system, supplying the electricity demand over time and saving thepossible contingencies because every inhabitant needs to be supplied with electricity intheir day to day. Operating the system in this way entails spending money. The first partof the project is going to be an analysis of the reliability and the economic impact of it.During the last decade, electric utilities and companies had be...

  6. 76 FR 60564 - President's Council of Advisors on Science and Technology; Notice of Meeting: Open Regional...

    Science.gov (United States)

    2011-09-29

    ... development. Facility and infrastructure sharing. Policies that could create a fertile innovation environment...; Notice of Meeting: Open Regional Meeting of the President's Council of Advisors on Science and Technology... schedule and summary agenda for an open regional meeting of the President's Council of Advisors on Science...

  7. 75 FR 22168 - Region VI-Houston District; Advisory Council Meeting; Public Meeting

    Science.gov (United States)

    2010-04-27

    ... SMALL BUSINESS ADMINISTRATION Region VI--Houston District; Advisory Council Meeting; Public Meeting The Small Business Administration-Region VI--Houston Advisory Council, located in the geographical Area of Houston, Texas will hold a federal public meeting on--Thursday, May 20, 2010, starting at 10:30...

  8. Reliability Evaluation for Optimizing Electricity Supply in a Developing Country

    OpenAIRE

    Mark Ndubuka NWOHU

    2007-01-01

    The reliability standards for electricity supply in a developing country, like Nigeria, have to be determined on past engineering principles and practice. Because of the high demand of electrical power due to rapid development, industrialization and rural electrification; the economic, social and political climate in which the electric power supply industry now operates should be critically viewed to ensure that the production of electrical power should be augmented and remain uninterrupted. ...

  9. Distribution-level electricity reliability: Temporal trends using statistical analysis

    International Nuclear Information System (INIS)

    Eto, Joseph H.; LaCommare, Kristina H.; Larsen, Peter; Todd, Annika; Fisher, Emily

    2012-01-01

    This paper helps to address the lack of comprehensive, national-scale information on the reliability of the U.S. electric power system by assessing trends in U.S. electricity reliability based on the information reported by the electric utilities on power interruptions experienced by their customers. The research analyzes up to 10 years of electricity reliability information collected from 155 U.S. electric utilities, which together account for roughly 50% of total U.S. electricity sales. We find that reported annual average duration and annual average frequency of power interruptions have been increasing over time at a rate of approximately 2% annually. We find that, independent of this trend, installation or upgrade of an automated outage management system is correlated with an increase in the reported annual average duration of power interruptions. We also find that reliance on IEEE Standard 1366-2003 is correlated with higher reported reliability compared to reported reliability not using the IEEE standard. However, we caution that we cannot attribute reliance on the IEEE standard as having caused or led to higher reported reliability because we could not separate the effect of reliance on the IEEE standard from other utility-specific factors that may be correlated with reliance on the IEEE standard. - Highlights: ► We assess trends in electricity reliability based on the information reported by the electric utilities. ► We use rigorous statistical techniques to account for utility-specific differences. ► We find modest declines in reliability analyzing interruption duration and frequency experienced by utility customers. ► Installation or upgrade of an OMS is correlated to an increase in reported duration of power interruptions. ► We find reliance in IEEE Standard 1366 is correlated with higher reported reliability.

  10. Reliability evaluation of deregulated electric power systems for planning applications

    International Nuclear Information System (INIS)

    Ehsani, A.; Ranjbar, A.M.; Jafari, A.; Fotuhi-Firuzabad, M.

    2008-01-01

    In a deregulated electric power utility industry in which a competitive electricity market can influence system reliability, market risks cannot be ignored. This paper (1) proposes an analytical probabilistic model for reliability evaluation of competitive electricity markets and (2) develops a methodology for incorporating the market reliability problem into HLII reliability studies. A Markov state space diagram is employed to evaluate the market reliability. Since the market is a continuously operated system, the concept of absorbing states is applied to it in order to evaluate the reliability. The market states are identified by using market performance indices and the transition rates are calculated by using historical data. The key point in the proposed method is the concept that the reliability level of a restructured electric power system can be calculated using the availability of the composite power system (HLII) and the reliability of the electricity market. Two case studies are carried out over Roy Billinton Test System (RBTS) to illustrate interesting features of the proposed methodology

  11. 75 FR 36385 - Reliability Standards Development and NERC and Regional Entity Enforcement Supplemental Notice of...

    Science.gov (United States)

    2010-06-25

    ... Standards Development and NERC and Regional Entity Enforcement Supplemental Notice of Technical Conference... development and enforcement of mandatory Reliability Standards for the Bulk-Power System by the North American Electric Reliability Corporation and the Regional Entities. The conference will be held on Tuesday, July 6...

  12. 75 FR 35021 - Reliability Standards Development and NERC and Regional Entity Enforcement; Notice of Technical...

    Science.gov (United States)

    2010-06-21

    ... Standards Development and NERC and Regional Entity Enforcement; Notice of Technical Conference June 15, 2010... Technical Conference to address industry perspectives on certain issues pertaining to the development and... Electric Reliability Organization's (ERO) standards development process; communication and interactions...

  13. Puget Sound area electric reliability plan

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

  14. FUNDAMENTALS OF RELIABILITY OF ELECTRIC POWER SYSTEM AND EQUIPMENT

    OpenAIRE

    Engr. Anumaka; Michael Chukwukadibia

    2011-01-01

    Today, the electric power system consists of complex interconnected network which are prone to different problems that militates against the reliability of the power system. Inadequate reliability in the power system causes problems such as high failure rate of power system installations and consumer equipment, transient and intransient faults, symmetrical faults etc. This paper provides an extensive review of the powers system and equipment reliability and related failure patterns in equipment.

  15. Electricity distribution. Price control, reliability and customer services: response to OFFER

    International Nuclear Information System (INIS)

    1994-02-01

    This document presents the views of the National Consumer Council to a recent consultation paper from OFFER, the body responsible for regulation of the United Kingdom electric power industry. The financial performance of the Regional Electricity Companies (RECs) is reviewed by examining how it relates to the prices paid by domestic consumers. A critical analysis is presented of OFFER's notion of the revision of the existing price control mechanism for the distribution businesses within the RECs. Standards of performance, debt and consumer disconnection are also examined. (UK)

  16. 78 FR 20166 - Meeting of the Regional Resource Stewardship Council

    Science.gov (United States)

    2013-04-03

    ... public comment session will be held at 9:30 a.m., CDT, on Thursday, April 25. Persons wishing to speak.... Introductions 2. Presentation(s) concerning Trout Fish Hatchery projects in Tennessee and Georgia, the need for..., and partnership efforts to sustain trout hatcheries 3. Public Comments 4. Council Discussion and...

  17. 78 FR 78466 - Meeting of the Regional Energy Resource Council

    Science.gov (United States)

    2013-12-26

    .... The public comment session will be held at 10:00 a.m. EST, on January 23. Persons wishing to speak are... includes the following: 1. Welcome and Introductions 2. TVA updates regarding recent Board of Directors.... Public Comments 5. Council Discussion on the balancing of TVA's business objectives during Integrated...

  18. Influence of reliability of the relay protection to the whole reliability of electric power systems

    International Nuclear Information System (INIS)

    Stojanovski, Ljupcho I.

    2001-01-01

    The influence of the reliability of the elements of relay protection up today analyses of the reliability on electric power systems, very rare has been taken into consideration, in other words, in these analyses it is assumed that the reliability of the protection has value one. In this work an attempt is that through modelling of individual types of protection of the elements of high-voltage systems to make calculation to the influence of the reliability of the relay protection on the total reliability of the high-voltage systems.(Author)

  19. A COMPUTERIZED DIAGNOSTIC COMPLEX FOR RELIABILITY TESTING OF ELECTRIC MACHINES

    Directory of Open Access Journals (Sweden)

    O.О. Somka

    2015-06-01

    Full Text Available Purpose. To develop a diagnostic complex meeting the criteria and requirements for carrying out accelerated reliability test and realizing the basic modes of electric machines operation and performance of the posed problems necessary in the process of such test. Methodology. To determine and forecast the indices of electric machines reliability in accordance with the statistic data of repair plants we have conditionally divided them into structural parts that are most likely to fail. We have preliminarily assessed the state of each of these parts, which includes revelation of faults and deviations of technical and geometric parameters. We have determined the analyzed electric machine controlled parameters used for assessment of quantitative characteristics of reliability of these parts and electric machines on the whole. Results. As a result of the research, we have substantiated the structure of a computerized complex for electric machines reliability test. It allows us to change thermal and vibration actions without violation of the physics of the processes of aging and wearing of the basic structural parts and elements material. The above mentioned makes it possible to considerably reduce time spent on carrying out electric machines reliability tests and improve trustworthiness of the data obtained as a result of their performance. Originality. A special feature of determination of the controlled parameters consists in removal of vibration components in the idle mode and after disconnection of the analyzed electric machine from the power supply with the aim of singling out the vibration electromagnetic component, fixing the degree of sparking and bend of the shaft by means of phototechnique and local determination of structural parts temperature provided by corresponding location of thermal sensors. Practical value. We have offered a scheme of location of thermal and vibration sensors, which allows improvement of parameters measuring accuracy

  20. Report on progress in creating the internal gas and electricity market. Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee of the Regions

    International Nuclear Information System (INIS)

    2010-01-01

    In late 2008 and 2009, the world was hit by the financial and economic crisis. This had a direct impact on the demand for energy, causing unpredicted falls in the price of oil on the international markets. This, in turn, impacted on gas and electricity prices. A dispute between two companies outside the EU (Gazprom of Russia and Naftogaz of Ukraine) led to an unprecedented crisis in the EU's gas supply. Between 6 and 20 January 2009, gas flows from Russia to the EU via Ukraine were interrupted, affecting several Member States. 2009 was also an important year because the third internal energy market package was adopted on 13 July 2009. The third package strengthens the regulatory framework that is needed in order to make market opening fully effective, in the interest of achieving the lowest possible energy prices, better energy security and sustainability. This report discusses how the developments described above have impacted on the EU electricity and gas markets over the past year and how they are likely to affect market developments in the future.

  1. Applying reliability analysis to design electric power systems for More-electric aircraft

    Science.gov (United States)

    Zhang, Baozhu

    The More-Electric Aircraft (MEA) is a type of aircraft that replaces conventional hydraulic and pneumatic systems with electrically powered components. These changes have significantly challenged the aircraft electric power system design. This thesis investigates how reliability analysis can be applied to automatically generate system topologies for the MEA electric power system. We first use a traditional method of reliability block diagrams to analyze the reliability level on different system topologies. We next propose a new methodology in which system topologies, constrained by a set reliability level, are automatically generated. The path-set method is used for analysis. Finally, we interface these sets of system topologies with control synthesis tools to automatically create correct-by-construction control logic for the electric power system.

  2. Reliability modeling of Clinch River breeder reactor electrical shutdown systems

    International Nuclear Information System (INIS)

    Schatz, R.A.; Duetsch, K.L.

    1974-01-01

    The initial simulation of the probabilistic properties of the Clinch River Breeder Reactor Plant (CRBRP) electrical shutdown systems is described. A model of the reliability (and availability) of the systems is presented utilizing Success State and continuous-time, discrete state Markov modeling techniques as significant elements of an overall reliability assessment process capable of demonstrating the achievement of program goals. This model is examined for its sensitivity to safe/unsafe failure rates, sybsystem redundant configurations, test and repair intervals, monitoring by reactor operators; and the control exercised over system reliability by design modifications and the selection of system operating characteristics. (U.S.)

  3. Reliability & availability of wind turbine electrical & electronic components

    NARCIS (Netherlands)

    Tavner, P.; Faulstich, S.; Hahn, B.; Bussel, van G.J.W.

    2010-01-01

    Recent analysis of European onshore wind turbine reliability data has shown that whilst wind turbine mechanical subassemblies tend to have relatively low failure rates but long downtimes, electrical and electronic subassemblies have relatively high failure rates and short downtimes. For onshore wind

  4. Voluntary Participation in Regional Fisheries Management Council Meetings

    Directory of Open Access Journals (Sweden)

    Danielle T. Brzezinski

    2010-09-01

    Full Text Available Insufficient and unrepresentative participation in voluntary public hearings and policy discussions has been problematic since Aristotle's time. In fisheries, research has shown that involvement is dominated by financially resourceful and extreme-opinion stakeholders and tends to advantage groups that have a lower cost of attendance. Stakeholders may exhibit only one or all of these traits but can be still similarly advantaged. The opposites of these traits tend to characterize the disadvantaged, such as the middle-ground opinions, the less wealthy or organized, and the more remote stakeholders. Remoteness or distance is the most straightforward and objective of these characteristics to measure. We analyzed the New England Fishery Management Council's sign-in sheets for 2003-2006, estimating participants' travel distance and associations with the groundfish, scallop, and herring industries. We also evaluated the representativeness of participation by comparing attendance to landings and permit distributions. The distance analysis showed a significant correlation between attendance levels and costs via travel distance. These results suggest a potential bias toward those stakeholders residing closer to meeting locations, possibly disadvantaging parties who are further and must incur higher costs. However, few significant differences were found between the actual fishing industry and attendee distributions, suggesting that the geographical distribution of the meeting attendees is statistically similar to that of the larger fishery. The interpretation of these results must take into consideration the limited time span of the analysis, as policy changes may have altered the industry make-up and location prior to our study. Furthermore, the limited geographical input of stakeholders may lend bias to the Council's perception of ecological and social conditions throughout the spatial range of the fishery. These factors should be further considered in

  5. Load As A Reliability Resource in the Restructured Electricity Market

    Energy Technology Data Exchange (ETDEWEB)

    Kueck, J.D.

    2002-06-10

    Recent electricity price spikes are painful reminders of the value that meaningful demand-side responses could bring to the restructuring US electricity system. Review of the aggregate offers made by suppliers confirms that even a modest increase in demand elasticity could dramatically reduce these extremes in price volatility. There is a strong need for dramatically increased customer participation in these markets to enhance system reliability and reduce price volatility. Indeed, allowing customers to manage their loads in response to system conditions might be thought of as the ultimate reliability resource. Most would agree that meaningful demand-side responses to price are the hallmark of a well-functioning competitive market [1]. Yet, in today's markets for electricity, little or no such response is evident. The reason is simple: customers currently do not experience directly the time-varying costs of their consumption decisions. Consequently, they have no incentive to modify these decisions in ways that might enhance system reliability or improve the efficiency of the markets in which electricity is traded. Increased customer participation is a necessary step in the evolution toward more efficient markets for electricity and ancillary services. This scoping report provides a three-part assessment of the current status of efforts to enhance the ability of customer's load to participate in competitive markets with a specific focus on the role of customer loads in enhancing electricity system reliability. First, this report considers the definitions of electricity-reliability-enhancing ancillary services (Section 2) and a preliminary assessment of the ability of customer's loads to provide these services. Second, is a review a variety of programs in which load has been called on as a system reliability resource (Section 3). These experiences, drawn from both past and current utility and ISO programs, focus on programs triggered by system

  6. 50 CFR 100.11 - Regional advisory councils.

    Science.gov (United States)

    2010-10-01

    ... (CONTINUED) NATIONAL WILDLIFE MONUMENTS SUBSISTENCE MANAGEMENT REGULATIONS FOR PUBLIC LANDS IN ALASKA Program... subsistence resource region to participate in the Federal subsistence management program. The Regional... interests within a region and 30 percent of the members represent commercial and sport interests within a...

  7. 75 FR 80391 - Electric Reliability Organization Interpretations of Interconnection Reliability Operations and...

    Science.gov (United States)

    2010-12-22

    ... transmission (G&T) cooperative or similar organization to accept compliance responsibility on behalf of its... be found on the Commission's Web site; see, e.g., the ``Quick Reference Guide for Paper Submissions... Electric Reliability Standards, Order No. 672, FERC Stats. & Regs. ] 31,204, order on reh'g, Order No. 672...

  8. 75 FR 16159 - Prince William Sound Regional Citizens' Advisory Council (PWSRCAC) Charter Renewal

    Science.gov (United States)

    2010-03-31

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard [USCG-2010-0121] Prince William Sound Regional... the Prince William Sound Regional Citizens' Advisory Council (PWSRCAC) as an alternative voluntary advisory group for Prince William Sound, Alaska. This certification allows the PWSRCAC to monitor the...

  9. 77 FR 19301 - Prince William Sound Regional Citizens' Advisory Council Charter Renewal

    Science.gov (United States)

    2012-03-30

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard [USCG-2012-0099] Prince William Sound Regional... Prince William Sound Regional Citizens' Advisory Council (PWSRCAC) as an alternative voluntary advisory group for Prince William Sound, Alaska. This certification allows the PWSRCAC to monitor the activities...

  10. Staff Report to the Secretary on Electricity Markets and Reliability

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-08-01

    Energy Secretary Rick Perry issued a memo in April of 2017 requesting a study and directing his staff to develop a report to include an assessment of the reliability and resilience of the electric grid and an overview of the evolution of electricity markets. Various factors have emerged over the past 15 years which have impacted power supply and demand in different ways. This study, prepared by experts throughout the Department, contains a comprehensive analysis of these factors and the corresponding data, and presents a series of recommendations meant to inform and guide policy makers, regulators, and the general public. Potential areas for further research are also presented.

  11. Interim report by a Committee on Demands and Supplies of Electric Enterprise Council

    International Nuclear Information System (INIS)

    1984-01-01

    An interim report by a committee on demands and supplies, Electric Enterprise Council, was given for the period up to the year 2000. The demands of electric power in Japan were set as 658,000 million kWh for 1990 and 768,000 million kWh for 1995. The electric power enterprises appear to be at a major turning point at present, that is, the growth in the demands tended to slow down. The features of the situation are then the stabilized supply, supply cost reduction, reasonable power source constitution, etc. The following things are described. Background and policy; power demand outlook and supply measures; power supply and supply efficiency (the composition of power sources, respective power sources with supply targets and problems, etc.); power demand/supply outlook for 2000. (Mori, K.)

  12. Electric power monthly, March 1998 with data for December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The Electric Power Monthly (EPM) provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 63 tabs.

  13. Managing relationships between electric power industry restructuring and grid reliability

    International Nuclear Information System (INIS)

    Thomas, R.J.

    2005-01-01

    The electricity system is a critical infrastructure, and its continued and reliable functioning is essential to the nation's economy and well-being. However, the inter-dependency of electricity networks is not completely understood. The economic impact of outages was discussed in this white paper. It was suggested that moving to a restructured environment has degraded the reliability of the bulk system. New institutional arrangements and approaches to information management are needed. It was suggested that reliability practices caused the 2003 blackout, and not technical failures. Uncertainties in the restructured market were discussed, as well as incentives to maintain system adequacy. Examples of deregulation in other countries were presented. Organizational complexities were reviewed, including the Federal Energy Regulatory Commission's (FERC) requirements and the new layers of complexity that have been added to the decision-making process in the light of restructuring. Planning and connectivity issues were reviewed. The need for design standards in power grid control centres was discussed. Difficulties in collecting data from different control centres were considered. Issues concerning the lack of investment in research and development were discussed, with particular reference to the urgent need for coordinated research programs. The looming manpower crisis in the electric power industry was also discussed. Recommendations included ensuring that the transmission system can support a market structure; building a national reliability centre; solving the manpower crisis; and testing market designs before deploying them. It was concluded that good engineering design principles, including experimental economic testing, should be required of any new electricity market design before authorizing its use. 31 refs., 1 tab., 6 figs

  14. 18 CFR 39.4 - Funding of the Electric Reliability Organization.

    Science.gov (United States)

    2010-04-01

    ... CERTIFICATION OF THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.4 Funding of the Electric Reliability Organization. (a) Any... Reliability Organization. 39.4 Section 39.4 Conservation of Power and Water Resources FEDERAL ENERGY...

  15. Reliability payments to generation capacity in electricity markets

    International Nuclear Information System (INIS)

    Olsina, Fernando; Pringles, Rolando; Larisson, Carlos; Garcés, Francisco

    2014-01-01

    Electric power is a critical input to modern economies. Generation adequacy and security of supply in power systems running under competition are currently topics of high concern for consumers, regulators and governments. In a market setting, generation investments and adequacy can only be achieved by an appropriate regulatory framework that sets efficient remuneration to power capacity. Theoretically, energy-only electricity markets are efficient and no additional mechanism is needed. Nonetheless, the energy-only market design suffers from serious drawbacks. Therefore, jointly with the evolution of electricity markets, many remunerating mechanisms for generation capacity have been proposed. Explicit capacity payment was the first remunerating approach implemented and perhaps still the most applied. However, this price-based regulation has been applied no without severe difficulties and criticism. In this paper, a new reliability payment mechanism is envisioned. Capacity of each generating unit is paid according to its effective contribution to overall system reliability. The proposed scheme has many attractive features and preserves the theoretical efficiency properties of energy-only markets. Fairness, incentive compatibility, market power mitigation and settlement rules are investigated in this work. The article also examines the requirements for system data and models in order to implement the proposed capacity mechanism. A numerical example on a real hydrothermal system serves for illustrating the practicability of the proposed approach and the resulting reliability payments to the generation units. - Highlights: • A new approach for remunerating supply reliability provided by generation units is proposed. • The contribution of each generating unit to lessen power shortfalls is determined by simulations. • Efficiency, fairness and incentive compatibility of the proposed reliability payment are assessed

  16. Reliability Electrical Power System of Hospital as Cold Standby System

    Directory of Open Access Journals (Sweden)

    Grabski Franciszek

    2016-07-01

    Full Text Available The probabilistic model of a hospital electrical power system consisting of mains, an emergency power system and the automatic transfer switch with the generator starter are discussed in this paper. The reliability model is semi-Markov process describing two different units renewable cold standby system and switch. The embedded Semi-Markov processes concept is applied for description of the system evolution. Time to failure of the system is represented by a random variable denoting the first passage time of the process from the given state to the subset of states. The appropriate theorems of the Semi-Markov processes theory allow us to evaluate the reliability function and some reliability characteristics.

  17. Regional impacts of expanding gas-fired electric generation in the Northeast U.S. and Eastern Canada

    International Nuclear Information System (INIS)

    Mitchell, G.K.

    2001-01-01

    For the purpose of this presentation, the author placed emphasis on the northeast United States, including New York, New England, plus Ontario, Quebec and the Maritime provinces in Canada. The entire region comes under the Northeast Power Coordinating Committee (NPCC) of the North American Electric Reliability Council (NERC). The objective of this Council is to assist with the coordination of electric supply as well as transmission planning and reliability of the utilities. The annual ten year forecast of electric supply, demand and fuel sources produced by the NERC formed the basis for the data presented. The deregulation of the electricity market in a few jurisdictions in the region resulted in the break-up of several electric utilities into their core components: generation, distribution and transmission. The generation sector is where the fastest break-up activity is taking place and merchant energy companies are emerging. Each of these merchant energy companies is competing against the other to effect sales into the wholesale power market through the building of at risk generation plants. The deregulation process is subjected to different processes and time tables depending on each state or provincial regulations. The construction of new power plants in the region is being driven by the merchant energy companies. They are building low capital cost and highly efficient natural gas combined-cycle base load plants as well as lower cost and moderately efficient natural gas/oil-fired simple-cycle peaking plants. This activity is mainly restricted to the United States, since hydroelectric power, coal and nuclear power are the main presence in Canada. New England experiences summer peaks while Canada has winter peak electric demand. To optimize intra-regional peak generation capacity sharing, there is an opportunity for the electric industry to move gas by wire, and a number of projects are being developed. It is expected that pipeline expansion will be lower in

  18. 76 FR 17180 - Meeting of the Regional Resource Stewardship Council

    Science.gov (United States)

    2011-03-28

    ... area components of the draft NRP and the benefits and challenges stemming from such programs. 5. Public... and will be called on during the public comment period. Handout materials should be limited to one printed page. Written comments are also invited and may be mailed to the Regional Resource Stewardship...

  19. Basic Principles of Electrical Network Reliability Optimization in Liberalised Electricity Market

    Science.gov (United States)

    Oleinikova, I.; Krishans, Z.; Mutule, A.

    2008-01-01

    The authors propose to select long-term solutions to the reliability problems of electrical networks in the stage of development planning. The guide lines or basic principles of such optimization are: 1) its dynamical nature; 2) development sustainability; 3) integrated solution of the problems of network development and electricity supply reliability; 4) consideration of information uncertainty; 5) concurrent consideration of the network and generation development problems; 6) application of specialized information technologies; 7) definition of requirements for independent electricity producers. In the article, the major aspects of liberalized electricity market, its functions and tasks are reviewed, with emphasis placed on the optimization of electrical network development as a significant component of sustainable management of power systems.

  20. Alberta Advisory Council on Electricity report to the Alberta Minister of Energy

    International Nuclear Information System (INIS)

    2002-06-01

    This report presents the deliberations of the Alberta Advisory Council on Electricity regarding the restructuring of the electric power industry in the province of Alberta. Strategic issues affecting restructuring over the long term were considered with particular attention to small consumers. The long term vision (Vision 2012) for electric power restructuring is to promote efficient and competitive markets attracting investment and innovation that will result in fair and equitable prices for consumers. It was noted that while the restructuring system is currently in place, progress has not been even across the system. It is expected that it will take several years before a restructured electricity industry is fully functioning. Recommendations were presented to establish a plan to address issues regarding restructuring within power generation, transmission, distribution and export/import policies. The issue of market power, competitiveness and consumer education was also discussed. It was also noted that there are many external forces that impact the electricity system, many of which come from outside Alberta. These include fluctuations in gas prices, electricity demand, changes in the United States, regulatory decisions in other jurisdictions and unexpected business events. It was emphasized that a strong, liquid and competitive wholesale market is vital to achieving Vision 2012. Key factors for a competitive wholesale market include adequate generation, transmission capability and export/import capacity. The report presents the following 3 scenarios: business as usual, managed transition, and freedom 2012. A review of restructuring in several other jurisdictions around the world was also provided. 1 tab., 1 fig

  1. Strategies for regional integration of electricity supply in West Africa

    International Nuclear Information System (INIS)

    Gnansounou, Edgard; Bayem, Herman; Bednyagin, Denis; Dong, Jun

    2007-01-01

    To improve peoples' living conditions in West African countries national governments have to considerably reinforce the electricity supply infrastructures. Rehabilitation of the existing installations and construction of new power generation facilities and transmission lines require substantial resources which are tremendously difficult to raise due to the region's specific economical and political conditions. This paper examines the long-term prospects for integrated development of the regional electricity industry and evaluates its advantages by using PLANELEC-Pro, a 'bottom-up' electricity system expansion planning optimisation model. The evolution of regional electricity market is analysed on the basis of two strategies. The 'autarkical' strategy consists in adequate expansion of national power generation systems and the exchanges of electricity between the countries in sub-zones. Another approach referred to as 'integration' strategy is recommended in this article. It leads to fast retirement of the obsolete power plants and the integration of new investment projects at the level of whole West African sub-region. The main finding is that the regional integration strategy is capable to bring about additional benefits in terms of reduced capital expenditures, lower electricity supply cost and the enhanced system's reliability compared to the autarkical strategy

  2. Perceptions of International Teacher Turnover in East Asia Regional Council of Schools

    Science.gov (United States)

    Tkachyk, Leon Michael

    2017-01-01

    High teacher turnover has become a serious problem globally, in many international schools, and is a growing concern in segments of the East Asia Regional Council of Schools (EARCOS). This persistent problem has a detrimental effect on student learning and upsets the culture of school communities. Herzberg's motivation-hygiene theory served as the…

  3. 75 FR 59143 - Magnuson-Stevens Fishery Conservation and Management Act; Regional Fishery Management Councils...

    Science.gov (United States)

    2010-09-27

    ... collection-of-information requirements contained in this rule may be submitted to Alan Risenhoover, Director... basis for salary of Council executive directors be put on par with that of NMFS Regional Administrators... broadened and clarified to include any income, grant, or other monetary or in-kind remuneration received by...

  4. Electric power monthly, April 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-07

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  5. Electric power monthly, May 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-25

    The Electric Power Monthly (EPM) is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  6. 76 FR 7839 - Notice of Commission and Commission Staff Attendance at ISO/RTO Council and Regional State...

    Science.gov (United States)

    2011-02-11

    ... Staff Attendance at ISO/RTO Council and Regional State Committees Meeting The Federal Energy Regulatory... ISO/RTO Council and Regional State Committees meeting: Saturday, February 12, 2011, 1 p.m.-4 p.m... following proceeding: Docket No. AD10-5-000, RTO/ISO Performance Metrics. For more information, contact...

  7. Distribution reliability in the reformed New Zealand electricity industry

    International Nuclear Information System (INIS)

    McGlinchy, B. J.

    1997-01-01

    The process of deregulating the electric power industry in New Zealand, which began in 1984, and is now a fully competitive system, was described. The industry is not only fully competitive, but enjoys the distinction of being subject only to very light-handed regulation. The regulation requires each company within the industry to publish an annual financial statement, the rate of profit and some performance indicators including reliability indices. Companies also report on faults in lines and cables, and on a voluntary basis they contribute to a 'by cause' survey, using indicators developed by the Canadian Electricity Association. It is expected that the indices that will be developed from this data will be used as benchmarks for performance. The data could also be used for probability analysis in system expansion programs. 6 refs., 7 figs

  8. Transmission reliability faces future challenges

    International Nuclear Information System (INIS)

    Beaty, W.

    1993-01-01

    The recently published Washington International Energy Group's 1993 Electric Utility Outlook states that nearly one-third (31 percent) of U.S. utility executives expect reliability to decrease in the near future. Electric power system stability is crucial to reliability. Stability analysis determines whether a system will stay intact under normal operating conditions, during minor disturbances such as load fluctuations, and during major disturbances when one or more parts of the system fails. All system elements contribute to reliability or the lack of it. However, this report centers on the transmission segment of the electric system. The North American Electric Reliability Council (NERC) says the transmission systems as planned will be adequate over the next 10 years. However, delays in building new lines and increasing demands for transmission services are serious concerns. Reliability concerns exist in the Mid-Continent Area Power Pool and the Mid-America Interconnected Network regions where transmission facilities have not been allowed to be constructed as planned. Portions of the transmission systems in other regions are loaded at or near their limits. NERC further states that utilities must be allowed to complete planned generation and transmission as scheduled. A reliable supply of electricity also depends on adhering to established operating criteria. Factors that could complicate operations include: More interchange schedules resulting from increased transmission services. Increased line loadings in portions of the transmission systems. Proliferation of non-utility generators

  9. Estimated Value of Service Reliability for Electric Utility Customers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, M.J.; Mercurio, Matthew; Schellenberg, Josh

    2009-06-01

    Information on the value of reliable electricity service can be used to assess the economic efficiency of investments in generation, transmission and distribution systems, to strategically target investments to customer segments that receive the most benefit from system improvements, and to numerically quantify the risk associated with different operating, planning and investment strategies. This paper summarizes research designed to provide estimates of the value of service reliability for electricity customers in the US. These estimates were obtained by analyzing the results from 28 customer value of service reliability studies conducted by 10 major US electric utilities over the 16 year period from 1989 to 2005. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods it was possible to integrate their results into a single meta-database describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the US for industrial, commercial, and residential customers. Estimated interruption costs for different types of customers and of different duration are provided. Finally, additional research and development designed to expand the usefulness of this powerful database and analysis are suggested.

  10. Regional analysis of the nuclear-electricity

    International Nuclear Information System (INIS)

    Parera, M. D.

    2011-11-01

    In this study was realized a regional analysis of the Argentinean electric market contemplating the effects of regional cooperation, the internal and international interconnections; and the possibilities of insert of new nuclear power stations were evaluated in different regions of the country, indicating the most appropriate areas to carry out these facilities to increase the penetration of the nuclear energy in the national energy matrix. Also was studied the interconnection of the electricity and natural gas markets, due to the existent linking among both energy forms. With this purpose the program Message (Model for energy supply strategy alternatives and their general environmental impacts) was used, promoted by the International Atomic Energy Agency. This model carries out an economic optimization level country, obtaining the minimum cost as a result for the modeling system. The division for regions realized by the Compania Administradora del Mercado Mayorista Electrico (CAMMESA) was used, which divides to the country in eight regions. They were considered the characteristics and necessities of each one of them, their respective demands and offers of electric power and natural gas, as well as their existent and projected interconnections, composed by the electric lines and gas pipes. According to the results obtained through the model, the nuclear-electricity is a competitive option. (Author)

  11. Thermal Management and Reliability of Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant

    2016-08-03

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil -- by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines will be presented.

  12. Thermal Management and Reliability of Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant

    2016-06-13

    Increasing the number of electric-drive vehicles (EDVs) on America's roads has been identified as a strategy with near-term potential for dramatically decreasing the nation's dependence on oil - by the U.S. Department of Energy, the federal cross-agency EV-Everywhere Challenge, and the automotive industry. Mass-market deployment will rely on meeting aggressive technical targets, including improved efficiency and reduced size, weight, and cost. Many of these advances will depend on optimization of thermal management. Effective thermal management is critical to improving the performance and ensuring the reliability of EDVs. Efficient heat removal makes higher power densities and lower operating temperatures possible, and in turn enables cost and size reductions. The National Renewable Energy Laboratory (NREL), along with DOE and industry partners is working to develop cost-effective thermal management solutions to increase device and component power densities. In this presentation, the activities in recent years related to thermal management and reliability of automotive power electronics and electric machines are presented.

  13. Decree No. 77-1233 of 10 November 1977 setting up a Council for information on nuclear electricity generation

    International Nuclear Information System (INIS)

    1977-01-01

    This Decree sets up a Council for information on nuclear electricity generation directly under the authority of and appointed by the Prime Minister. It has 18 members who include, inter alia, mayors of the communes concerned by nuclear power plant siting, representatives of nature and environmental protection associations, science academicians and economics, energy and communications experts. The Council's purpose is to ensure that the public has access to infomation on nuclear electricity generation from the technical, health, ecological, economic and financial viewpoints. It advises the Government on the public's conditions of access to information and proposes methods for its dissemination. (NEA) [fr

  14. How reliably can climate change and mitigation policy impacts on electric utilities be assessed?

    International Nuclear Information System (INIS)

    Dowlatabadi, H.; Kopp, R.J.; Palmer, K.; De Witt, D.

    1993-01-01

    Numerous mechanisms link climate change and electric utilities. Electricity generation releases radiatively active trace substances (RATS). Significant changes in atmospheric concentration of RATS can lead to a change in regional and global climate regimes. Mitigation action designed to prevent or limit climate change is possible through curbing emissions. Climate change and related mitigation actions impact on electric utilities. Foresight in electric utility planning requires reliable predictions of how the utilities may be affected in the decades ahead. In this paper the impacts of climate change and mitigation policies are noted, and our ability to assess these is reviewed. To this end a suite of models exploring supply and demand questions have been developed. The overall conclusion of the study is that the demand-side uncertainties dominate other unknowns and need to be better characterized and understood. (author)

  15. 78 FR 10169 - Federal Advisory Committee Act; Communications Security, Reliability, and Interoperability Council

    Science.gov (United States)

    2013-02-13

    ... Location Accuracy, Network Security Best Practices, DNSSEC Implementation Practices for ISPs, Secure BGP... FEDERAL COMMUNICATIONS COMMISSION Federal Advisory Committee Act; Communications Security... persons that the Federal Communications Commission's (FCC) Communications Security, Reliability, and...

  16. 76 FR 72922 - Federal Advisory Committee Act; Communications Security, Reliability, and Interoperability Council

    Science.gov (United States)

    2011-11-28

    ... alerting systems, 9-1-1 location accuracy, and network security. The FCC will attempt to accommodate as... FEDERAL COMMUNICATIONS COMMISSION Federal Advisory Committee Act; Communications Security... persons that the Federal Communications Commission's (FCC) third Communications Security, Reliability, and...

  17. Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

    International Nuclear Information System (INIS)

    Touati, Said; Chennai, Salim; Souli, Aissa

    2015-01-01

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

  18. Electric Power quality Analysis in research reactor: Impacts on nuclear safety assessment and electrical distribution reliability

    Energy Technology Data Exchange (ETDEWEB)

    Touati, Said; Chennai, Salim; Souli, Aissa [Nuclear Research Centre of Birine, Ain Oussera, Djelfa Province (Algeria)

    2015-07-01

    The increased requirements on supervision, control, and performance in modern power systems make power quality monitoring a common practise for utilities. Large databases are created and automatic processing of the data is required for fast and effective use of the available information. Aim of the work presented in this paper is the development of tools for analysis of monitoring power quality data and in particular measurements of voltage and currents in various level of electrical power distribution. The study is extended to evaluate the reliability of the electrical system in nuclear plant. Power Quality is a measure of how well a system supports reliable operation of its loads. A power disturbance or event can involve voltage, current, or frequency. Power disturbances can originate in consumer power systems, consumer loads, or the utility. The effect of power quality problems is the loss power supply leading to severe damage to equipments. So, we try to track and improve system reliability. The assessment can be focused on the study of impact of short circuits on the system, harmonics distortion, power factor improvement and effects of transient disturbances on the Electrical System during motor starting and power system fault conditions. We focus also on the review of the Electrical System design against the Nuclear Directorate Safety Assessment principles, including those extended during the last Fukushima nuclear accident. The simplified configuration of the required system can be extended from this simple scheme. To achieve these studies, we have used a demo ETAP power station software for several simulations. (authors)

  19. Region-specific study of the electric utility industry: financial history and future power requirements for the VACAR region

    International Nuclear Information System (INIS)

    Pochan, M.J.

    1985-07-01

    Financial data for the period 1966 to 1981 are presented for the four investor-owned electric utilities in the VACAR (Virginia-Carolinas) region. This region was selected as representative for the purpose of assessing the availability, reliability, and cost of electric power for the future in the United States. The estimated demand for power and planned additions to generating capacity for the region through the year 2000 are also given

  20. Puget Sound Area Electric Reliability Plan : Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, and during certain conditions, there is more demand for power in the Puget Sound area than the transmission system and existing generation can reliably supply. This high demand, called peak demand occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both.

  1. Nuclear electric propulsion operational reliability and crew safety study

    International Nuclear Information System (INIS)

    Karns, J.J.; Fragola, J.R.; Kahan, L.; Pelaccio, D.

    1993-01-01

    The central purpose of this analysis is to assess the ''achievability'' of a nuclear electric propulsion (NEP) system in a given mission. ''Achievability'' is a concept introduced to indicate the extent to which a system that meets or achieves its design goals might be implemented using the existing technology base. In the context of this analysis, the objective is to assess the achievability of an NEP system for a manned Mars mission as it pertains to operational reliability and crew safety goals. By varying design parameters, then examining the resulting system achievability, the design and mission risk drivers can be identified. Additionally, conceptual changes in design approach or mission strategy which are likely to improve overall achievability of the NEP system can be examined

  2. Towards a regional electricity market in Southeast Europe

    International Nuclear Information System (INIS)

    Ichord, R.F. Jr.

    2002-01-01

    Historical evolution of the region's electric power policy is overviewed. The regional characteristics of Southern Europe's electric power market are summarized. The reform indicators of the region's electricity markets are discussed. The status of privatization is presented. Factors in developing regional electricity market are considered. (R.P.)

  3. Electricity supply. Older plants' impact on reliability and air quality

    International Nuclear Information System (INIS)

    England-Joseph, Judy A.; Adams, Charles M.; Wood, David G.; Feehan, Daniel J.; Veal, Howard F.; Skeen, John H. III; Koenigs, Melvin J.; Lichtenfeld, David I.; Seretakis, Pauline J.

    1990-09-01

    Life extension of fossil fuel plants is a relatively recent phenomenon; thus, utilities have little experience to demonstrate the longer-term operating reliability of plants with an extended service life. While utility industry officials and government and industry studies express optimism that these plants will continue to operate reliably, the officials and the studies also caution that it is too soon to determine how pursuing life extension will affect the reliability of the nation's electricity supply. According to DOE, the number of fossil fuel generating units' 30 years old or older is expected to increase from about 2,500 in 1989 to roughly 3,700 in 1998, increasing such plants' share of overall generating capacity from 13 percent in 1989 to 27 percent in 1998. EPA estimates that with existing air quality requirements, fossil fuel plant emissions will increase steadily during the coming decade. Proposed acid rain control legislation, which would affect many plants that may have their service life extended, would require utilities to significantly reduce emissions by the year 2000 but would allow utilities flexibility in deciding how and where to achieve the reductions. If such legislation is enacted, utilities generally are expected to find reducing emissions from existing plants more cost-effective than replacing them and to continue extending plants' service life. Officials of DOE and utility organizations expressed concern, however, that EPA could decide, as it did for one plant in 1988, that alterations made in extending the service life of plants exempted from the Clean Air Act would result in increased emissions and thus cause the altered plants to lose their exemption. According to the officials, the additional costs of achieving the Clean Air Act's standards could discourage some life extension projects. However, such decisions by EPA could also reduce the nation's total power plant emissions by eliminating an existing incentive to retain exempt

  4. The storage of electric energy: an unavoidable dimension of energy transition. Opinion of the Economic, Social and Environmental Council

    International Nuclear Information System (INIS)

    Obadia, Alain

    2015-01-01

    After a brief synthesis, the opinion of the Council is stated. It presents the main objectives of the storage of electric energy, its main physical-chemical principles and the available technologies (gravity, compressed air energy storage, electrochemical, thermal, electric, and inertial storage), and the three main techniques: pumped-storage hydroelectricity, batteries, hydrogen. Global assessment and recommendations are discussed, notably in terms of economic and financial consequences, but also in terms of technological choices, research and development, local development, industrial cooperation, and legal framework. Appendices notably present in detail the different technologies, the operation of the electric grid in France and Europe, and some experiments

  5. 78 FR 44909 - Regional Reliability Standard BAL-002-WECC-2-Contingency Reserve

    Science.gov (United States)

    2013-07-25

    ...\\ Mandatory Reliability Standards for the Bulk-Power System, Order No. 693, FERC Stats. & Regs. ] 31,242...-002-WECC-2 (Contingency Reserve). The North American Electric Reliability Corporation (NERC) and... (Technical Information), Office of Electric Reliability, Division of Reliability Standards, Federal Energy...

  6. Evaluating North American Electric Grid Reliability Using the Barabasi-Albert Network Model

    OpenAIRE

    Chassin, David P.; Posse, Christian

    2004-01-01

    The reliability of electric transmission systems is examined using a scale-free model of network structure and failure propagation. The topologies of the North American eastern and western electric networks are analyzed to estimate their reliability based on the Barabasi-Albert network model. A commonly used power system reliability index is computed using a simple failure propagation model. The results are compared to the values of power system reliability indices previously obtained using s...

  7. Puget Sound area electric reliability plan: Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin

  8. Reliability of supply in competitive electricity markets: The Nordic electricity Market

    International Nuclear Information System (INIS)

    Singh, Balbir

    2005-12-01

    An overview of the current regulation and performance of the network utilities with respect to the reliability of supply across Europe in general indicates wide variation. On the regional level the situation in the Nordic market is no exception. Can the variation in reliability of supply in Nordic region be explained by differences in regulatory frameworks in the Nordic countries and is it possible to draw any best practice lessons for other countries and regions? The Norwegian regulation and performance with respect to reliability criterion is encouraging, however it must be emphasized that the Norwegian experience with reliability regulation in its current form covers a period of 3 years, a period that is too short to evaluate the Norwegian model. A closer examination of the Norwegian model reveals dynamic trade off in reliability performance, which if permanent may endanger the reliability of supply in the long-run. Last, but not the least important is the criterion that choice of regulation should be based on a careful social cost-benefit analysis of the regulatory model where both cost incurred by the regulatory agencies and the compliance costs incurred by the regulated utilities are included. A preliminary analysis of regulatory agencies in the Nordic market indicates that Norwegian model of network regulation is quite resource incentive. While it is premature to draw conclusions about the national regulatory mechanisms, the Nordic cross border regulation through voluntary arrangements under the auspices of NORDEL provides a good example of an arrangement that is useful when implementation of a formal regulatory regime across different jurisdiction is not possible

  9. 76 FR 23801 - North American Electric Reliability Corporation; Order Approving Reliability Standard

    Science.gov (United States)

    2011-04-28

    ... have an operating plan and facilities for backup functionality to ensure Bulk-Power System reliability... entity's primary control center on the reliability of the Bulk-Power System. \\1\\ Mandatory Reliability... potential impact of a violation of the Requirement on the reliability of the Bulk-Power System. The...

  10. International Council of Ophthalmology: Refocusing Ophthalmic Education in the Asia-Pacific Region and Beyond.

    Science.gov (United States)

    Golnik, Karl; Mayorga, Eduardo; Spivey, Bruce; Ritch, Robert; Gauthier, Tina-Marie

    2012-01-01

    The International Council of Ophthalmology (ICO) is a global organization with a regional focus. Working in partnership with supranational and ICO member societies, the ICO is building a "World Alliance for Sight" to improve access to the highest-quality eye care worldwide. Designed to preserve and restore vision on an international scale, the ICO initiative, "Refocusing Ophthalmic Education," enhances ophthalmic education of residents, subspecialists, medical students, and allied eye care personnel by redefining the most effective ways to teach and in creating beneficial educational opportunities. The "Teaching the Teachers" program helps ophthalmic educators incorporate more effective methods of training and continuing professional development to meet societal needs, achieved in part through regional courses for residency program directors; symposia, and keynote talks presented by ICO's World Ophthalmology Educational Colloquium, Conferences for Ophthalmic Educators, and ophthalmic surgical competency rubrics. Recognizing that standardized curricula are essential for consistent ophthalmic education, the ICO has developed a curricular framework whereby goals, expectations, knowledge base, competencies, and technical training are delineated. The ICO is defining worldwide models of team training and compiling best practice, which will include training-program accreditation to ensure improvement in the education of ophthalmologists. International Council of Ophthalmology Web-based teaching courses, a Webinar Network, and a technology blog further support information and communication technologies for teaching and learning. At the ICO's Center for Ophthalmic Educators (educators.icoph.org), trainers will find valuable teaching resources in multiple languages as well as ways to share ideas and collaborate with peers and other ophthalmic educators.

  11. Bayesian approach in the power electric systems study of reliability ...

    African Journals Online (AJOL)

    Keywords: Reliability - Power System - Bayes Theorem - Weibull Model - Probability. ... ensure a series of estimated parameter (failure rate, mean time to failure, function .... only on random variable r.v. describing the operating conditions: ..... Multivariate performance reliability prediction in real-time, Reliability Engineering.

  12. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Energy Information Administration (EIA) prepares the Electric Power Monthly (EPM) for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. This publication provides monthly statistics for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source, consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead.

  13. Reliability Prediction Approaches For Domestic Intelligent Electric Energy Meter Based on IEC62380

    Science.gov (United States)

    Li, Ning; Tong, Guanghua; Yang, Jincheng; Sun, Guodong; Han, Dongjun; Wang, Guixian

    2018-01-01

    The reliability of intelligent electric energy meter is a crucial issue considering its large calve application and safety of national intelligent grid. This paper developed a procedure of reliability prediction for domestic intelligent electric energy meter according to IEC62380, especially to identify the determination of model parameters combining domestic working conditions. A case study was provided to show the effectiveness and validation.

  14. Reliability Assessment of Wind Farm Electrical System Based on a Probability Transfer Technique

    Directory of Open Access Journals (Sweden)

    Hejun Yang

    2018-03-01

    Full Text Available The electrical system of a wind farm has a significant influence on the wind farm reliability and electrical energy yield. The disconnect switch installed in an electrical system cannot only improve the operating flexibility, but also enhance the reliability for a wind farm. Therefore, this paper develops a probabilistic transfer technique for integrating the electrical topology structure, the isolation operation of disconnect switch, and stochastic failure of electrical equipment into the reliability assessment of wind farm electrical system. Firstly, as the traditional two-state reliability model of electrical equipment cannot consider the isolation operation, so the paper develops a three-state reliability model to replace the two-state model for incorporating the isolation operation. In addition, a proportion apportion technique is presented to evaluate the state probability. Secondly, this paper develops a probabilistic transfer technique based on the thoughts that through transfer the unreliability of electrical system to the energy transmission interruption of wind turbine generators (WTGs. Finally, some novel indices for describing the reliability of wind farm electrical system are designed, and the variance coefficient of the designed indices is used as a convergence criterion to determine the termination of the assessment process. The proposed technique is applied to the reliability assessment of a wind farm with the different topologies. The simulation results show that the proposed techniques are effective in practical applications.

  15. 78 FR 38851 - Electric Reliability Organization Proposal To Retire Requirements in Reliability Standards

    Science.gov (United States)

    2013-06-28

    ... either: Provide little protection for Bulk-Power System reliability or are redundant with other aspects... for retirement either: (1) Provide little protection for Bulk-Power System reliability or (2) are... to assure reliability of the Bulk-Power System and should be withdrawn. We have identified 41...

  16. Regional reliability of quantitative signal targeting with alternating radiofrequency (STAR) labeling of arterial regions (QUASAR).

    Science.gov (United States)

    Tatewaki, Yasuko; Higano, Shuichi; Taki, Yasuyuki; Thyreau, Benjamin; Murata, Takaki; Mugikura, Shunji; Ito, Daisuke; Takase, Kei; Takahashi, Shoki

    2014-01-01

    Quantitative signal targeting with alternating radiofrequency labeling of arterial regions (QUASAR) is a recent spin labeling technique that could improve the reliability of brain perfusion measurements. Although it is considered reliable for measuring gray matter as a whole, it has never been evaluated regionally. Here we assessed this regional reliability. Using a 3-Tesla Philips Achieva whole-body system, we scanned four times 10 healthy volunteers, in two sessions 2 weeks apart, to obtain QUASAR images. We computed perfusion images and ran a voxel-based analysis within all brain structures. We also calculated mean regional cerebral blood flow (rCBF) within regions of interest configured for each arterial territory distribution. The mean CBF over whole gray matter was 37.74 with intraclass correlation coefficient (ICC) of .70. In white matter, it was 13.94 with an ICC of .30. Voxel-wise ICC and coefficient-of-variation maps showed relatively lower reliability in watershed areas and white matter especially in deeper white matter. The absolute mean rCBF values were consistent with the ones reported from PET, as was the relatively low variability in different feeding arteries. Thus, QUASAR reliability for regional perfusion is high within gray matter, but uncertain within white matter. © 2014 The Authors. Journal of Neuroimaging published by the American Society of Neuroimaging.

  17. The Regional Advisory Councils: what is their potential to incorporate stakeholder knowledge into fisheries governance?

    Science.gov (United States)

    Linke, Sebastian; Dreyer, Marion; Sellke, Piet

    2011-03-01

    The protection of the Baltic Sea ecosystem is exacerbated by the social, environmental and economic complexities of governing European fisheries. Increased stakeholder participation and knowledge integration are suggested to improve the EU's Common Fisheries Policy (CFP), suffering from legitimacy, credibility and compliance problems. As a result, the CFP was revised in 2002 to involve fisheries representatives, NGOs and other stakeholders through so called Regional Advisory Councils (RACs) in the policy process. We address the RAC's task to incorporate stakeholder knowledge into the EU's fisheries governance system in empirical and theoretical perspectives. Drawing on a four-stage governance concept we subsequently suggest that a basic problem is a mismatch between participation purpose (knowledge inclusion) and the governance stage at which RACs are formally positioned (evaluation of management proposals). We conclude that, if the aim is to broaden the knowledge base of fisheries management, stakeholders need to be included earlier in the governance process.

  18. Can Slovakia secure reliable electricity supply without nuclear?

    International Nuclear Information System (INIS)

    Pnacek, I.

    2004-01-01

    In this presentation author deals with structure of electricity production in the Slovak republic in 2006 and perspectives of electricity supply up to 2020 year. Decommissioning of Unit 1 and Unit 2 of the Bohunice NPP and completion of Unit 3 and 4 of the Mochovce NPP are discussed

  19. Advisory Council on Electricity report and recommendations on consumers concern : report to the Alberta Minister of Energy

    International Nuclear Information System (INIS)

    Bolger, L.F.

    2003-09-01

    This report presents a set of recommendations to help the Alberta government and industry address consumer concerns regarding electricity issues. It examined whether the restructuring process is working as planned and presented ways to move forward to create certainty in the marketplace, competitive prices, an adequate supply of electricity, and fair treatment for all consumers. Consumers are currently concerned about the following key electricity issues: higher electricity prices in some parts of Alberta; billing practices of utility companies; fairness of all line items on bills; consumer accessibility to competitive market options; long-range forecasts for consumer prices; current and future benefits of deregulation for consumers; and, the impact of government and Alberta Energy and Utilities Board decisions on consumer prices. The Council recommends that consumer education be expanded; a consumer ombudsman be established; markets be allowed to operate; and that billing practices and customer satisfaction be improved. The Council also suggests that the impact of flow-through regulated rate tariff be reviewed on an ongoing basis. It also recommends that the progress in the retail mass market be monitored and that the impact of change in some parts of the province be mitigated

  20. Electric power monthly, August 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-13

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  1. Electric power monthly, September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-17

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  2. Electric power monthly

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Sandra R.; Johnson, Melvin; McClevey, Kenneth; Calopedis, Stephen; Bolden, Deborah

    1992-05-01

    The Electric Power Monthly is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed for the North American Electric Reliability Council (NERC) regions. Additionally, statistics by company and plant are published in the EPM on capability of new plants, new generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel.

  3. Bulk electric system reliability evaluation incorporating wind power and demand side management

    Science.gov (United States)

    Huang, Dange

    Electric power systems are experiencing dramatic changes with respect to structure, operation and regulation and are facing increasing pressure due to environmental and societal constraints. Bulk electric system reliability is an important consideration in power system planning, design and operation particularly in the new competitive environment. A wide range of methods have been developed to perform bulk electric system reliability evaluation. Theoretically, sequential Monte Carlo simulation can include all aspects and contingencies in a power system and can be used to produce an informative set of reliability indices. It has become a practical and viable tool for large system reliability assessment technique due to the development of computing power and is used in the studies described in this thesis. The well-being approach used in this research provides the opportunity to integrate an accepted deterministic criterion into a probabilistic framework. This research work includes the investigation of important factors that impact bulk electric system adequacy evaluation and security constrained adequacy assessment using the well-being analysis framework. Load forecast uncertainty is an important consideration in an electrical power system. This research includes load forecast uncertainty considerations in bulk electric system reliability assessment and the effects on system, load point and well-being indices and reliability index probability distributions are examined. There has been increasing worldwide interest in the utilization of wind power as a renewable energy source over the last two decades due to enhanced public awareness of the environment. Increasing penetration of wind power has significant impacts on power system reliability, and security analyses become more uncertain due to the unpredictable nature of wind power. The effects of wind power additions in generating and bulk electric system reliability assessment considering site wind speed

  4. Reliable electricity. The effects of system integration and cooperative measures to make it work

    International Nuclear Information System (INIS)

    Hagspiel, Simeon; Koeln Univ.

    2017-01-01

    We investigate the effects of system integration for reliability of supply in regional electricity systems along with cooperative measures to support it. Specifically, we set up a model to contrast the benefits from integration through statistical balancing (i.e., a positive externality) with the risk of cascading outages (a negative externality). The model is calibrated with a comprehensive dataset comprising 28 European countries on a high spatial and temporal resolution. We find that positive externalities from system integration prevail, and that cooperation is key to meet reliability targets efficiently. To enable efficient solutions in a non-marketed environment, we formulate the problem as a cooperative game and study different rules to allocate the positive and negative effects to individual countries. Strikingly, we find that without a mechanism, the integrated solution is unstable. In contrast, proper transfer payments can be found to make all countries better off in full integration, and the Nucleolus is identified as a particularly promising candidate. The rule could be used as a basis for compensation payments to support the successful integration and cooperation of electricity systems.

  5. Reliable electricity. The effects of system integration and cooperative measures to make it work

    Energy Technology Data Exchange (ETDEWEB)

    Hagspiel, Simeon [Koeln Univ. (Germany). Energiewirtschaftliches Inst.; Koeln Univ. (Germany). Dept. of Economics

    2017-12-15

    We investigate the effects of system integration for reliability of supply in regional electricity systems along with cooperative measures to support it. Specifically, we set up a model to contrast the benefits from integration through statistical balancing (i.e., a positive externality) with the risk of cascading outages (a negative externality). The model is calibrated with a comprehensive dataset comprising 28 European countries on a high spatial and temporal resolution. We find that positive externalities from system integration prevail, and that cooperation is key to meet reliability targets efficiently. To enable efficient solutions in a non-marketed environment, we formulate the problem as a cooperative game and study different rules to allocate the positive and negative effects to individual countries. Strikingly, we find that without a mechanism, the integrated solution is unstable. In contrast, proper transfer payments can be found to make all countries better off in full integration, and the Nucleolus is identified as a particularly promising candidate. The rule could be used as a basis for compensation payments to support the successful integration and cooperation of electricity systems.

  6. Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

    Energy Technology Data Exchange (ETDEWEB)

    Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

    2014-02-24

    This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to

  7. methanization development in Ile-de-France - Ile-de-France region. Synthesis. The Regional Council strategy for methanization development

    International Nuclear Information System (INIS)

    2013-06-01

    A first document reports the study of methanization development in the Ile-de-France region by addressing biomass produced on the region territory. It aimed at identifying and assessing the existing and potential physical resource while introducing mobilisation rates in order to define different scenarios. A situational analysis of operated and projected methanization installations has also been performed. These projects have been classified according to a typology, and analysed according to the proposed scenarios. The position of methanization with respect to other biomass valorisation sectors, as well as the impact of mobilisation with respect to a return-to-soil of organic matters have also been discussed. A second document proposes a synthetic version of this study. The third document presents the Regional Council's policy and strategy regarding methanization development: challenges and prospective scenarios, importance of a sustainable methanization at the service of territory development, regulation for a call for projects, project assessment and selection, project footprint, inputs qualities and supplies, energetic and agronomic valorisation, and grid for project analysis. An appendix contains a synthetic version of the first document

  8. Bayesian approach in the power electric systems study of reliability ...

    African Journals Online (AJOL)

    Subsequently, Bayesian methodologies are framed in an ampler problem list, based on the definition of an opportune "vector of state" and of a vector describing the system performances, aiming to the definition and the calculation or the estimation of system reliability. The purpose of our work is to establish a useful model ...

  9. Engineering and Design: Reliability Analysis of Navigation Lock and Dam Mechanical and Electrical Equipment

    National Research Council Canada - National Science Library

    Beranek, Dwight

    2001-01-01

    This engineer technical letter (ETL) provides guidance for assessing the reliability of mechanical and electrical systems of navigation locks and dams and for establishing an engineering basis for major rehabilitation investment decisions...

  10. Electric power monthly, January 1991. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-17

    This publication provides monthly statistics at the national, Census division, and state levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 4 figs., 48 tabs.

  11. Electric power monthly, October 1991. [CONTAINS GLOSSARY

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-11

    This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 4 figs., 63 tabs.

  12. Electric Power Monthly, September 1991. [CONTAINS GLOSSARY

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-12

    This publication provides monthly statistics at the national, Census division, and state levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fuel are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 4 figs., 63 tabs.

  13. Electric power monthly, April 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the U.S., Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. This April 1994 issue contains 1993 year-end data and data through January 1994.

  14. Electric power monthly, April 1991

    International Nuclear Information System (INIS)

    1991-01-01

    The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national Census division, and State level. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data are given for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, revenue, and average revenue per kilowatt hour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, statistics at the company and plant level are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. 6 figs., 57 tabs

  15. Industrial plant electrical systems: Simplicity, reliability, cost savings, redundancies

    International Nuclear Information System (INIS)

    Silvestri, A.; Tommazzolli, F.; Pavia Univ.

    1992-01-01

    This article represents a compact but complete design and construction manual for industrial plant electrical systems. It is to be used by design engineers having prior knowledge of local power supply routes and voltages and regards principally the optimum choice of internal distribution systems which can be radial or single, double ringed or with various network configurations, and with single or multiple supplies, and many or few redundancies. After giving guidelines on the choosing of these options, the manual deals with problematics relevant to suitable cable sizing. A cost benefit benefit analysis method is suggested for the choice of the number of redundancies. Recommendations are given for the choice of transformers, motorized equipment, switch boards and circuit breakers. Reference is made to Italian electrical safety and building codes

  16. 75 FR 14103 - Version One Regional Reliability Standard for Resource and Demand Balancing

    Science.gov (United States)

    2010-03-24

    ... current regional Reliability Standard was developed and used under a manual interchange transaction...] Version One Regional Reliability Standard for Resource and Demand Balancing March 18, 2010. AGENCY... section 215 of the Federal Power Act, the Commission proposes to remand a revised regional Reliability...

  17. 76 FR 23470 - Version One Regional Reliability Standard for Transmission Operations

    Science.gov (United States)

    2011-04-27

    ...; Order No. 752] Version One Regional Reliability Standard for Transmission Operations AGENCY: Federal... Power Act, the Federal Energy Regulatory Commission approves regional Reliability Standard TOP-007-WECC... purpose of this regional Reliability Standard is to ensure that actual flows and associated scheduled...

  18. Electric power monthly, February 1998 with data for November 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The Electric Power Monthly (EPM) provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 63 tabs.

  19. The integrated North American electricity market : a bi-national model for securing a reliable supply of electricity

    International Nuclear Information System (INIS)

    Egan, T.

    2004-03-01

    The 50 million people who experienced the power blackout on August 14, 2003 in southern Ontario and the U.S. Midwest and Northeast understood how vital electricity is in our day-to-day lives, but they also saw the resiliency of the North American electricity system. More than 65 per cent of the power generation was restored to service within 12 hours and no damage was caused to the generation or transmission facilities. Although the interconnected North American electricity system is among the most reliable in the world, it is threatened by an aging infrastructure, lack of new generation and transmission to meet demand, and growing regulatory pressures. This report suggests that any measures that respond to the threat of ongoing reliability should be bi-national in scope due to the interconnected nature of the system. Currently, the market, regulatory and administrative systems are different in each country. The full engagement and cooperation of both Canada and the United States is important to ensure future cross-border trade and power reliability. The Canadian Electricity Association proposes the following 7 measures: (1) support an open debate on all the supply options available to meet growing power demands, (2) promote bi-national cooperation in the construction of new transmission capacity to ensure a reliable continental electricity system, (3) examine opportunities for bi-national cooperation for investment in advanced transmission technologies and transmission research and development, (4) promote new generation technology and demand-side measures to relieve existing transmission constraints and reduce the need for new transmission facilities, (5) endorse a self-governing international organization for developing and enforcing mandatory reliability standards for the electricity industry, (6) coordinate measures to promote critical infrastructure protection, and (7) harmonize U.S. and Canadian efforts to streamline or clarify regulation of electricity

  20. Electric Power Infrastructure Reliability and Security (EPIRS) Reseach and Development Initiative

    Energy Technology Data Exchange (ETDEWEB)

    Rick Meeker; L. Baldwin; Steinar Dale; Alexander Domijan; Davild Larbalestier; Hui Li; Peter McLaren; Sastry Pamidi; Horatio Rodrigo; Michael Steurer

    2010-03-31

    Power systems have become increasingly complex and face unprecedented challenges posed by population growth, climate change, national security issues, foreign energy dependence and an aging power infrastructure. Increased demand combined with increased economic and environmental constraints is forcing state, regional and national power grids to expand supply without the large safety and stability margins in generation and transmission capacity that have been the rule in the past. Deregulation, distributed generation, natural and man-made catastrophes and other causes serve to further challenge and complicate management of the electric power grid. To meet the challenges of the 21st century while also maintaining system reliability, the electric power grid must effectively integrate new and advanced technologies both in the actual equipment for energy conversion, transfer and use, and in the command, control, and communication systems by which effective and efficient operation of the system is orchestrated - in essence, the 'smart grid'. This evolution calls for advances in development, integration, analysis, and deployment approaches that ultimately seek to take into account, every step of the way, the dynamic behavior of the system, capturing critical effects due to interdependencies and interaction. This approach is necessary to better mitigate the risk of blackouts and other disruptions and to improve the flexibility and capacity of the grid. Building on prior Navy and Department of Energy investments in infrastructure and resources for electric power systems research, testing, modeling, and simulation at the Florida State University (FSU) Center for Advanced Power Systems (CAPS), this project has continued an initiative aimed at assuring reliable and secure grid operation through a more complete understanding and characterization of some of the key technologies that will be important in a modern electric system, while also fulfilling an education and

  1. CIRDAP -- the British Council Regional Workshop. Towards Gender Equity: Poverty, Rights, and Participation.

    Science.gov (United States)

    1998-03-01

    This article describes a February 1998, regional workshop entitled "Towards Gender Equity: Poverty, Rights, and Participation," which was organized by the Center on Integrated Rural Development for Asia and the Pacific (CIRDAP) and the British Council. Participants included about 60 high-level representatives of governments, nongovernmental organizations, academicians, and activists from CIRDAP, the UK, and Bangladesh. The aim was to identify ways to monitor the implementation of the Beijing Platform of Action (BPOA)in CIRDAP member countries and advocate continual compliance with the BPOA. The agenda included five issue-based working sessions, plenaries, group discussions, adoption of group resolutions, and closure. Participants visited urban schools run by the Bangladesh Rural Advancement Committee and the Gono Shahajjo Sangstha that provided education for low income, disadvantaged children. Press conferences were held pre-post workshop. Each participant at the workshop end identified at least one issue or recommendation that they would follow-up on after the workshop. Subthemes were access to income for women (access to and control of resources, microcredit, and small enterprises); rights (land rights, inheritance of property, and legal rights); political participation (good governance, community participation); economic reforms and sustainable development (structural adjustment, liberalization, and globalization), and BPOA. Under each subtheme are lists of issues or problems and recommendations.

  2. Regionally-varying and regionally-uniform electricity pricing policies compared across four usage categories

    International Nuclear Information System (INIS)

    Cho, Seong-Hoon; Kim, Taeyoung; Kim, Hyun Jae; Park, Kihyun; Roberts, Roland K.

    2015-01-01

    The objective of our research is to predict how electricity demand varies spatially between status quo regionally-uniform electricity pricing and hypothetical regionally-varying electricity pricing across usage categories. We summarize the empirical results of a case study of electricity demand in South Korea with three key findings and their related implications. First, the price elasticities of electricity demand differ across usage categories. Specifically, electricity demands for manufacturing and retail uses are price inelastic and close to unit elastic, respectively, while those for agricultural and residential uses are not statistically significant. This information is important in designing energy policy, because higher electricity prices could reduce electricity demands for manufacturing and retail uses, resulting in slower growth in those sectors. Second, spatial spillovers in electricity demand vary across uses. Understanding the spatial structure of electricity demand provides useful information to energy policy makers for anticipating changes in demand across regions via regionally-varying electricity pricing for different uses. Third, simulation results suggest that spatial variations among electricity demands by usage category under a regionally-varying electricity-pricing policy differ from those under a regionally-uniform electricity-pricing policy. Differences in spatial changes between the policies provide information for developing a realistic regionally-varying electricity-pricing policy according to usage category. - Highlights: • We compare regionally-varying and regionally-uniform electricity pricing policies. • We summarize empirical results of a case study of electricity demand in South Korea. • We confirm that spatial spillovers in electricity demands vary across different uses. • We find positive spatial spillovers in the manufacturing and residential sectors. • Our methods help policy makers evaluate regionally-varying pricing

  3. UN Security Council Practice and Regional Arrangements: Procedure, Legitimacy and International Justice

    DEFF Research Database (Denmark)

    Cullen, Miriam

    2015-01-01

    When the United Nations Security Council first met in January 1946, it was unable to reach agreement on rules of procedure to govern its operation. Instead, “provisional” rules were adopted in anticipation of further negotiation at a later date. The same provisional rules govern the Council’s work...... today, but provide only the skeletal framework of its contemporary practice. From the early 1990s, the Council increasingly implemented informal working methods to expedite its decision-making. This paper will critically examine the tension between the procedural practice of the Security Council...... to act ‘in conformity with the principles of justice and international law’ as stipulated in the very first provision of the United Nations Charter. Scholarship to date has largely ignored the procedural context of Security Council decisions, notwithstanding it provides the very structure within which...

  4. Reliability of copper based alloys for electric resistance spot welding

    International Nuclear Information System (INIS)

    Jovanovicj, M.; Mihajlovicj, A.; Sherbedzhija, B.

    1977-01-01

    Durability of copper based alloys (B-5 and B-6) for electric resistance spot-welding was examined. The total amount of Be, Ni and Zr was up to 2 and 1 wt.% respectively. Good durability and satisfactory quality of welded spots were obtained in previous laboratory experiments carried out on the fixed spot-welding machine of an industrial type (only B-5 alloy was examined). Electrodes made of both B-5 and B-6 alloy were tested on spot-welding grips and fixed spot-welding machines in Tvornica automobila Sarajevo (TAS). The obtained results suggest that the durability of electrodes made of B-5 and B-6 alloys is more than twice better than of that used in TAS

  5. The electricity market reinvention by regional renewal

    OpenAIRE

    Fontaine, Sebastian

    2016-01-01

    Just one hundred years ago, electricity was classified as a luxury good. Since renewable energies entered the German market 25 years ago, they slowly started to change some fundamental conditions. The ubiquity of electrical devices in our daily life is not something we think about anymore in the industrialised world. It has become as normal as breathing. Yet unlike air, power has to be obtained and distributed. The constant availability of current is therefore not a given thing, but something...

  6. 76 FR 70122 - Plan for Conduct of 2012 Electric Transmission Congestion Study

    Science.gov (United States)

    2011-11-10

    ... regional reliability councils, regional transmission organizations (RTOs) and independent system operators... transmission organizations (RTOs), independent system operators (ISOs), and other stakeholders to describe...

  7. 78 FR 803 - Revisions to Electric Reliability Organization Definition of Bulk Electric System and Rules of...

    Science.gov (United States)

    2013-01-04

    ... Bulk 74. Electric System 1. Inclusion I1 (Transformers) 75. Commission Determination 80. 2. Inclusion... configurations are included in the bulk electric system. Inclusions: I1--Transformers with the primary terminal... bulk electric system. 15. NERC explained that inclusion I1 includes transformers with the primary...

  8. Updated Value of Service Reliability Estimates for Electric Utility Customers in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Sullivan, Michael [Nexant Inc., Burlington, MA (United States); Schellenberg, Josh [Nexant Inc., Burlington, MA (United States); Blundell, Marshall [Nexant Inc., Burlington, MA (United States)

    2015-01-01

    This report updates the 2009 meta-analysis that provides estimates of the value of service reliability for electricity customers in the United States (U.S.). The meta-dataset now includes 34 different datasets from surveys fielded by 10 different utility companies between 1989 and 2012. Because these studies used nearly identical interruption cost estimation or willingness-to-pay/accept methods, it was possible to integrate their results into a single meta-dataset describing the value of electric service reliability observed in all of them. Once the datasets from the various studies were combined, a two-part regression model was used to estimate customer damage functions that can be generally applied to calculate customer interruption costs per event by season, time of day, day of week, and geographical regions within the U.S. for industrial, commercial, and residential customers. This report focuses on the backwards stepwise selection process that was used to develop the final revised model for all customer classes. Across customer classes, the revised customer interruption cost model has improved significantly because it incorporates more data and does not include the many extraneous variables that were in the original specification from the 2009 meta-analysis. The backwards stepwise selection process led to a more parsimonious model that only included key variables, while still achieving comparable out-of-sample predictive performance. In turn, users of interruption cost estimation tools such as the Interruption Cost Estimate (ICE) Calculator will have less customer characteristics information to provide and the associated inputs page will be far less cumbersome. The upcoming new version of the ICE Calculator is anticipated to be released in 2015.

  9. Using VIIRS Day/Night Band to Measure Electricity Supply Reliability: Preliminary Results from Maharashtra, India

    Directory of Open Access Journals (Sweden)

    Michael L. Mann

    2016-08-01

    Full Text Available Unreliable electricity supplies are common in developing countries and impose large socio-economic costs, yet precise information on electricity reliability is typically unavailable. This paper presents preliminary results from a machine-learning approach for using satellite imagery of nighttime lights to develop estimates of electricity reliability for western India at a finer spatial scale. We use data from the Visible Infrared Imaging Radiometer Suite (VIIRS onboard the Suomi National Polar Partnership (SNPP satellite together with newly-available data from networked household voltage meters. Our results point to the possibilities of this approach as well as areas for refinement. With currently available training data, we find a limited ability to detect individual outages identified by household-level measurements of electricity voltage. This is likely due to the relatively small number of individual outages observed in our preliminary data. However, we find that the approach can estimate electricity reliability rates for individual locations fairly well, with the predicted versus actual regression yielding an R2 > 0.5. We also find that, despite the after midnight overpass time of the SNPP satellite, the reliability estimates derived are representative of daytime reliability.

  10. Assessing Changes in the Reliability of the U.S. Electric Power System

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Stanford Univ., CA (United States). Dept. of Physics; LaCommare, Kristina H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Eto, Joseph H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sweeney, James L. [Stanford Univ., CA (United States)

    2015-08-01

    Over the past 15 years, the most well-publicized efforts to assess trends in U.S. electric power system reliability have focused only on a subset of all power interruption events (see, for example, Amin 2008 and Campbell 2012)—namely, only the very largest events, which trigger immediate emergency reporting to federal agencies and industry regulators. Anecdotally, these events are thought by many to represent no more than 10% of the power interruptions experienced annually by electricity consumers. Moreover, a review of these emergency reports has identified shortcomings in relying on these data as reliable sources for assessing trends, even with the reliability events they report (Fisher et al. 2012). Recent work has begun to address these limitations by examining trends in reliability data collected annually by electricity distribution companies (Eto et al. 2012). In principle, all power interruptions experienced by electricity customers, regardless of size, are recorded by the distribution utility. Moreover, distribution utilities have a long history of recording this information, often in response to mandates from state public utility commissions (Eto et al. 2006). Thus, studies that rely on reliability data collected by distribution utilities can, in principle, provide a more complete basis upon which to assess trends or changes in reliability over time.

  11. Electric Power Monthly, September 1995: With data for June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions.

  12. Electric power monthly: April 1996, with data for January 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatt hour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 64 tabs.

  13. OPTIMIZATION OF THE RELIABILITY OF AGRICULTURAL CONSUMERS ELECTRICITY DISTRIBUTING AND SUPPLY SYSTEMS

    Directory of Open Access Journals (Sweden)

    Lupushor I.

    2007-12-01

    Full Text Available The problems of the optimization reliability in electrical networks of the different class of voltage have probabilistic nature, they discretely change and depend on the number of factors both definite and indefinite and have importance by selection of electric equipment, graph of development of electrical networks and voltage levels. The definition of the major factors, which have determining significance on their value and speed of their change allow to elaborate methods of their optimization and to elaborate effective methods of their growth limitation in electrical networks with the different class of voltage.

  14. High Electricity Demand in the Northeast U.S.: PJM Reliability Network and Peaking Unit Impacts on Air Quality.

    Science.gov (United States)

    Farkas, Caroline M; Moeller, Michael D; Felder, Frank A; Henderson, Barron H; Carlton, Annmarie G

    2016-08-02

    On high electricity demand days, when air quality is often poor, regional transmission organizations (RTOs), such as PJM Interconnection, ensure reliability of the grid by employing peak-use electric generating units (EGUs). These "peaking units" are exempt from some federal and state air quality rules. We identify RTO assignment and peaking unit classification for EGUs in the Eastern U.S. and estimate air quality for four emission scenarios with the Community Multiscale Air Quality (CMAQ) model during the July 2006 heat wave. Further, we population-weight ambient values as a surrogate for potential population exposure. Emissions from electricity reliability networks negatively impact air quality in their own region and in neighboring geographic areas. Monitored and controlled PJM peaking units are generally located in economically depressed areas and can contribute up to 87% of hourly maximum PM2.5 mass locally. Potential population exposure to peaking unit PM2.5 mass is highest in the model domain's most populated cities. Average daily temperature and national gross domestic product steer peaking unit heat input. Air quality planning that capitalizes on a priori knowledge of local electricity demand and economics may provide a more holistic approach to protect human health within the context of growing energy needs in a changing world.

  15. Small nuclear power reactor emergency electric power supply system reliability comparative analysis

    International Nuclear Information System (INIS)

    Bonfietti, Gerson

    2003-01-01

    This work presents an analysis of the reliability of the emergency power supply system, of a small size nuclear power reactor. Three different configurations are investigated and their reliability analyzed. The fault tree method is used as the main tool of analysis. The work includes a bibliographic review of emergency diesel generator reliability and a discussion of the design requirements applicable to emergency electrical systems. The influence of common cause failure influences is considered using the beta factor model. The operator action is considered using human failure probabilities. A parametric analysis shows the strong dependence between the reactor safety and the loss of offsite electric power supply. It is also shown that common cause failures can be a major contributor to the system reliability. (author)

  16. Título da página electrónica: International Risk Governance Council

    Directory of Open Access Journals (Sweden)

    Pedro Pinto dos Santos

    2012-12-01

    Full Text Available O International Risk Governance Council (IRGC é uma organização independente cuja missão é ajudar a compreender e a gerir riscos globais emergentes que têm impacto na segurança, saúde humana, ambiente, economia e na sociedade. O IRGC focaliza a sua acção no desenvolvimento de conceitos e estratégias de governação do risco, sendo esta uma área crucial perante a necessidade de tomar decisões relacionadas com o risco e de conseguir uma maximização da confiança das comunidades nos processos e na...

  17. Reliability of solid-state lighting electrical drivers subjected to WHTOL accelerated aging

    Energy Technology Data Exchange (ETDEWEB)

    Lall, Pradeep; Sakalauku, Peter; Davis, Lynn

    2014-05-27

    An investigation of a solid-state lighting (SSL) luminaire with the focus on the electronic driver which has been exposed to a standard wet hot temperature operating life (WHTOL) of 85% RH and 85°C in order to assess reliability of prolonged exposer to a harsh environment has been conducted. SSL luminaires are beginning introduced as head lamps in some of today's luxury automobiles and may also be fulfilling a variety of important outdoor applications such as overhead street lamps, traffic signals and landscape lighting. SSL luminaires in these environments are almost certain to encounter excessive moisture from humidity and high temperatures for a persistent period of time. The lack of accelerated test methods for LEDs to assess long-term reliability prior to introduction into the marketplace, a need for SSL physics based PHM modeling indicators for assessment and prediction of LED life, as well as the U.S. Department of Energy's R&D roadmap to replace todays lighting with SSL luminaires makes it important to increase the understanding of the reliability of SSL devices, specifically, in harsh environment applications. In this work, a set of SSL electrical drivers were investigated to determine failure mechanisms that occur during prolonged harsh environment applications. Each driver consists of four aluminum electrolytic capacitors (AECs) of three different types and was considered the weakest component inside the SSL electrical driver. The reliability of the electrical driver was assessed by monitoring the change in capacitance and the change in equivalent series resistance for each AEC, as well as monitoring the luminous flux of the SSL luminaire or the output of the electrical driver. The luminous flux of a pristine SSL electrical driver was also monitored in order to detect minute changes in the electrical drivers output and to aid in the investigation of the SSL luminaires reliability. The failure mechanisms of the electrical drivers have been

  18. Reliability Assessment of Offshore Wind Turbines Considering Faults of Electrical / Mechanical Components

    DEFF Research Database (Denmark)

    Kostandyan, Erik; Sørensen, John Dalsgaard

    2013-01-01

    For offshore wind turbines, the cost contribution to Cost of Energy from inspections and Operation & Maintenance can be substantial, and can be expected to increase when wind farms are placed at deeper water depths, further from the coast and in more harsh environments. Estimates of the reliability...... is considered and related to reliability estimation by taking into account faults e.g. due to failure of an electrical component or loss of grid....

  19. Flexibility and reliability in long-term planning exercises dedicated to the electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Maizi, Nadia; Drouineau, Mathilde; Assoumou, Edi; Mazauric, Vincent

    2010-09-15

    Long-term planning models are useful to build plausible options for future energy systems and must consequently address the technological feasibility and associated cost of these options. This paper focuses on the electricity sector and on problems of flexibility and reliability in power systems in order to improve results provided by long-term planning exercises: flexibility needs are integrated as an additional criterion for new investment decisions and, reliability requirements are assessed through the level of electrical losses they induced and a related cost. These approaches are implemented in a long-term planning model and demonstrated through a study of the Reunion Island.

  20. Report on Transparency. Final version CWE. IG Transparency. Electricity Regional Initiative Central Western Regional Electricity Market

    International Nuclear Information System (INIS)

    2007-12-01

    The Central Western Electricity Regional Energy Market (REM), which is a part of ERGEG's Electricity Regional Initiative, is engaged in harmonizing congestion management and transparency in the Central Western electricity market consisting of Belgium, France, Germany, Luxemburg and The Netherlands. his report contains transparency requirements based on the Congestion Management Guidelines (Commission Decision of 9 November 2006, 2006/770/EC, amending the Annex to Regulation (EC) 1228/2003 on conditions for access to transmission network for cross-border exchanges in electricity, hereinafter cited as CM Guidelines) but taking also into account ERGEG Guidelines of Good Practice on Information Management and Transparency (GGP-IMT). Generally, the basis for harmonization of the transparency rules within the Central Western REM is provided by this report. However, there are some restrictions, it has to be stressed that the report only refers to the information requirements set out in the CM Guidelines that are regularly updated. Also, national publication requirements which might go beyond what is prescribed here are not touched. Furthermore, the change of the market design or the legal background might require adoptions of the publication requirements foreseen in this report. One of the main impediments identified by the regulators was the data delivery from generation and consumption units located in the distribution grids. Market participants concerned (also generators and significant consumption units) are obliged to provide the TSOs responsible for publication of all relevant data concerning cross-border trade according to point 5.5 CM Guidelines, with the relevant data. Therefore, TSOs shall be able to get data from generators and significant consumption units connected to the transmission network. Consequently, it is proposed here that each NRA or other competent authority could oblige DSOs to provide data on generation connected to distribution grids to the TSOs

  1. Analysis of performance reliability of electrical and electronic equipment of car-tractor

    Directory of Open Access Journals (Sweden)

    Kravchenko О.Р.

    2016-08-01

    Full Text Available The analysis of the operational reliability of electrical and electronic equipment of vehicles, trucks Mercedes-Benz Actros 1844 LS and Volvo FH 1242, conducting international cargo transportation is performed. It is established that the equipment is reliable, which meets modern requirements, but where there is a violation of the resolution. The reason for repair work is constructive and operational factors. Distribution of efficiency and overall performance of operational reliability is retrieved. Items with more bounce are found. Common factors of violation of efficiency cars, trucks in operation, are largely different stages in warranty runs are obtained.

  2. Interim report of the supply/demand committee in Electric Enterprises Council

    International Nuclear Information System (INIS)

    1982-01-01

    Following a similar report made two odd years ago, an interim report was presented concerning the outlook of electric power demand and the development target for fiscal 1990, and also the electric power demand in the year 2000 to indicate the future direction. During the past two years, the energy situation both domestic and abroad has largely changed, including energy saving practice, petroleum substitute development, etc. The aggregate demand of electric power in fiscal 1990 was estimated at 795,000 million kwh, up about 4.3 % yearly from that in fiscal 1980. The target for nuclear power generation in fiscal 1990 was put at 46 million kw (22.0 % of the total power capacity). Then in the year 2000, the nuclear power generation in terms of capacity will be about 30 % of the aggregate total. (Mori, K.)

  3. Factors influencing the reliability of non-electric detonating circuit in underground uranium mines and preventive measures of misfiring

    International Nuclear Information System (INIS)

    Li Qin

    2010-01-01

    Characteristics of non-electric detonating circuit are introduced. The main factors influencing the reliability of non-electric detonating circuit are described. Taking an underground blasting of a uranium mine for example, the reliability of various kinds of detonating network system is calculated using the reliability theory and numerical analysis method. The reasons that cause the misfiring in non-electric detonating circuit system are analyzed, and preventive measures are put forward.(authors)

  4. The development of the Czech Republic electric industry - Reliable, safe and responsible source mix

    Energy Technology Data Exchange (ETDEWEB)

    Vrba, Miroslav; Jez, Jiri; Ptacek, Jiri

    2010-09-15

    The paper focuses on the development of the Czech Republic electric industry in close perspective and the prediction of its expected future in period up to 2030. The goal of the paper is to specify methods and procedures applied within periodic assessment of Czech electric power sector balance outlook for the State authorities. A necessity to respect economic recession and politicization of the issue of power sector development has invoked that these items are added to commonly used procedures. A key criterion is the reliable and safe electricity supply by adequate source mix for acceptable prices and environmental aspects.

  5. Optimal wind-hydro solution for the Marmara region of Turkey to meet electricity demand

    International Nuclear Information System (INIS)

    Dursun, Bahtiyar; Alboyaci, Bora; Gokcol, Cihan

    2011-01-01

    Wind power technology is now a reliable electricity production system. It presents an economically attractive solution for the continuously increasing energy demand of the Marmara region located in Turkey. However, the stochastic behavior of wind speed in the Marmara region can lead to significant disharmony between wind energy production and electricity demand. Therefore, to overcome wind's variable nature, a more reliable solution would be to integrate hydropower with wind energy. In this study, a methodology to estimate an optimal wind-hydro solution is developed and it is subsequently applied to six typical different site cases in the Marmara region in order to define the most beneficial configuration of the wind-hydro system. All numerical calculations are based on the long-term wind speed measurements, electrical load demand and operational characteristics of the system components. -- Research highlights: → This study is the first application of a wind-hydro pumped storage system in Turkey. → The methodology developed in this study is applied to the six sites in the Marmara region of Turkey. A wind - hydro pumped storage system is proposed to meet the electric energy demand of the Marmara region.

  6. Reliability

    OpenAIRE

    Condon, David; Revelle, William

    2017-01-01

    Separating the signal in a test from the irrelevant noise is a challenge for all measurement. Low test reliability limits test validity, attenuates important relationships, and can lead to regression artifacts. Multiple approaches to the assessment and improvement of reliability are discussed. The advantages and disadvantages of several different approaches to reliability are considered. Practical advice on how to assess reliability using open source software is provided.

  7. Price dynamics among U.S. electricity spot markets

    International Nuclear Information System (INIS)

    Park, Haesun; Mjelde, James W.; Bessler, David A.

    2006-01-01

    Combining recent advances in causal flows with time series analysis, relationships among 11 U.S. spot market electricity prices are examined. Results suggest that the relationships among the markets vary by time frame. In contemporaneous time, the western markets are separated from the eastern markets and the Electricity Reliability Council of Texas. At longer time frames these separations disappear, even though electricity transmission between the regions is limited. It appears the relationships among markets are not only a function of physical assets (such as transmissions lines among markets), but by similar and dissimilar institutional arrangements among the markets. (Author)

  8. Electric Power Monthly with data for July 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This publication provides monthly statistics at the state, census division, and U.S. levels for net generation; fossil fuel consumption and stocks, quantity, and quality of fossil fuels; cost of fossil fuels; electricity retail sales; associated revenue; and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council regions. Statistics on net generation are published by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The monthly update is summarized, and industry developments are briefly described. 57 tabs.

  9. Electric power monthly with data for June 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This publication provides monthly statistics at the state, census division, and U.S. levels for net generation; fossil fuel consumption and stocks, quantity, and quality of fossil fuels; cost of fossil fuels; electricity retail sales; associated revenue; and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity, and cost of fossil fuels are also displayed for the North American Electric Reliability Council regions. Statistics on net generation by energy source and capability of new generating units by company and plant are also included. A section is included in the report which summarizes major industry developments. 1 fig., 64 tabs.

  10. Reliable CPS design for mitigating semiconductor and battery aging in electric vehicles

    NARCIS (Netherlands)

    Chang, W.; Proebstl, A.; Goswami, D.; Zamani, M.; Chakraborty, S.

    2015-01-01

    Reliability and performance of cyber-physical systems (CPS) in electric vehicles (EVs) are influenced by three design aspects: (i) controller design, (ii) battery usage, i.e., Battery rate capacity and aging effects, (iii) processor aging of the in-vehicle embedded platform. In this paper, we

  11. 77 FR 59745 - Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation...

    Science.gov (United States)

    2012-10-01

    ...; Order No. 766] Delegation of Authority Regarding Electric Reliability Organization's Budget, Delegation... rule. SUMMARY: The Commission is issuing this Final Rule to revise its delegations of authority to... delegation agreements, and ERO policies and procedures. DATES: This rule is effective October 1, 2012. FOR...

  12. R&D program benefits estimation: DOE Office of Electricity Delivery and Energy Reliability

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-12-04

    The overall mission of the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE) is to lead national efforts to modernize the electric grid, enhance the security and reliability of the energy infrastructure, and facilitate recovery from disruptions to the energy supply. In support of this mission, OE conducts a portfolio of research and development (R&D) activities to advance technologies to enhance electric power delivery. Multiple benefits are anticipated to result from the deployment of these technologies, including higher quality and more reliable power, energy savings, and lower cost electricity. In addition, OE engages State and local government decision-makers and the private sector to address issues related to the reliability and security of the grid, including responding to national emergencies that affect energy delivery. The OE R&D activities are comprised of four R&D lines: High Temperature Superconductivity (HTS), Visualization and Controls (V&C), Energy Storage and Power Electronics (ES&PE), and Distributed Systems Integration (DSI).

  13. 78 FR 26349 - Notice of Commissioner and Staff Attendance at North American Electric Reliability Corporation...

    Science.gov (United States)

    2013-05-06

    ... Standards Oversight and Technology Committee Meetings Sheraton Boston Hotel, 39 Dalton Street, Boston, MA, 02199. May 8 (7:00 a.m.-5:00 p.m.) and May 9 (8:00 a.m.-1:00 p.m.), 2013 Further information regarding... American Electric Reliability Corporation For further information, please contact Jonathan First, 202-502...

  14. Evaluation of conventional electric power generating industry quality assurance and reliability practices

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.T.; Lauffenburger, H.A.

    1981-03-01

    The techniques and practices utilized in an allied industry (electric power generation) that might serve as a baseline for formulating Quality Assurance and Reliability (QA and R) procedures for photovoltaic solar energy systems were studied. The study results provide direct near-term input for establishing validation methods as part of the SERI performance criteria and test standards development task.

  15. Hybrid ellipsoidal fuzzy systems in forecasting regional electricity loads

    Energy Technology Data Exchange (ETDEWEB)

    Pai, Ping-Feng [Department of Information Management, National Chi Nan University, 1 University Road, Puli, Nantou 545, Taiwan (China)

    2006-09-15

    Because of the privatization of electricity in many countries, load forecasting has become one of the most crucial issues in the planning and operations of electric utilities. In addition, accurate regional load forecasting can provide the transmission and distribution operators with more information. The hybrid ellipsoidal fuzzy system was originally designed to solve control and pattern recognition problems. The main objective of this investigation is to develop a hybrid ellipsoidal fuzzy system for time series forecasting (HEFST) and apply the proposed model to forecast regional electricity loads in Taiwan. Additionally, a scaled conjugate gradient learning method is employed in the supervised learning phase of the HEFST model. Subsequently, numerical data taken from the existing literature is used to demonstrate the forecasting performance of the HEFST model. Simulation results reveal that the proposed model has better forecasting performance than the artificial neural network model and the regression model. Thus, the HEFST model is a valid and promising alternative for forecasting regional electricity loads. (author)

  16. Increasing the reliability of electric energy supply to consumers in ROMAG-PROD Heavy Water Plant

    International Nuclear Information System (INIS)

    Barta, Ioan; Hanes, Marian . E-mail electrica@romag.ro

    2004-01-01

    Full text: This work aims at achieving an analysis of time evolution of the status of electrical installations, their performances and reliability, at describing the refurbishment measures adopted, at assessing the efficiency of these measures and also to suggest solutions for improving the reliability in the electric energy supply of ROMAG-PROD Heavy Water Plant. The analysis started from the original design, the manner the electrical installations were mounted, the technological level of this equipment and gives an evaluation of the deficiencies and the evolution of incidents occurred during the operation period. On the basis of the experience gathered one advances new items for equipment renewing and refurbishment of electric installations which together with the existing ones would ensure an electric energy supply more secure and efficient, leading directly to a more safe and efficient operation of the ROMAG-PROD Heavy Water Plant. In this work the incidents of electric energy nature which occurred are analyzed, the equipment which generated events identified and measures to solve these problems proposed

  17. ASCERTAINMENT OF ELECTRIC-SUPPLY SCHEMES RELIABILITY FOR THE ATOMIC POWER PLANT AUXILIARIES

    Directory of Open Access Journals (Sweden)

    A. L. Starzhinskij

    2015-01-01

    Full Text Available The paper completes ascertainment of electrical-supply scheme reliability for the auxiliaries of a nuclear power plant. Thereat the author considers the system behavior during the block normal operation, carrying out current maintenance, and capital repairs in combination with initiating events. The initiating events for reactors include complete blackout, i.e. the loss of outside power supply (normal and reserve; emergency switching one of the working turbogenerators; momentary dumping the normal rating to the level of auxiliaries with seating the cutout valve of one turbo-generator. The combination of any initiating event with the repairing mode in case of one of the system elements failure should not lead to blackout occurrence of more than one system of the reliable power supply. This requirement rests content with the help of the reliable power supply system self-dependence (electrical and functional and the emergency power-supply operational autonomy (diesel generator and accumulator batteries.The reliability indicators of the power supply system for the nuclear power plant auxiliaries are the conditional probabilities of conjoined blackout of one, two, and three sections of the reliable power supply conditional upon an initiating event emerging and the blackout of one, two, and three reliable power-supply sections under the normal operational mode. Furthermore, they also are the blackout periodicity of one and conjointly two, three, and four sections of normal operation under the block normal operational mode. It is established that the blackout of one bus section of normal operation and one section of reliable power-supply system of the auxiliaries that does not lead to complete blackout of the plant auxiliaries may occur once in three years. The probability of simultaneous power failure of two or three normal-operation sections and of two reliable power-supply sections during the power plant service life is unlikely.

  18. Region-specific study of the electric utility industry: problem identification, analysis, and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Pochan, M.J.

    1985-07-01

    A number of problems were identified that could stand in the way of maintaining an adequate, reliable and economic supply of electric power for the United States in the future. The problems were analyzed by studying a specific region, VACAR (Virginia-Carolinas), in some detail. It was concluded that the future power supply is in jeopardy, but that drastic changes in the present system of investor-owned utilities, specifically, deregulation or government ownership, were not justified. It was recommended that the present electric system be modified and strengthened to meet future needs. 2 refs., 8 figs., 15 tabs.

  19. Region-specific study of the electric utility industry: problem identification, analysis, and recommendations

    International Nuclear Information System (INIS)

    Pochan, M.J.

    1985-07-01

    A number of problems were identified that could stand in the way of maintaining an adequate, reliable and economic supply of electric power for the United States in the future. The problems were analyzed by studying a specific region, VACAR (Virginia-Carolinas), in some detail. It was concluded that the future power supply is in jeopardy, but that drastic changes in the present system of investor-owned utilities, specifically, deregulation or government ownership, were not justified. It was recommended that the present electric system be modified and strengthened to meet future needs. 2 refs., 8 figs., 15 tabs

  20. Electricity consumers' council statement of case to the Sizewell 'B' power station public inquiry

    International Nuclear Information System (INIS)

    Barnes, M.

    1983-01-01

    Of the four arguments used in favour of Sizewell, the ECC considers that the economic benefit case is much the most important. Consumers will need to be convinced above all that Sizewell will help to restrain the growth of electricity prices. Of the other three arguments, plant need is not taken very seriously by the Board, making provision for future investment options hardly appears in the Statement of Case, and fuel diversity - while an important objective - can only be examined properly within the context of long-term investment strategy and relates only marginally to Sizewell as a self-standing project. Because a decision about Sizewell can in any case only be fully evaluated within the context of long-term plant strategy, the ECC has also briefly considered the most important long-term issues - the existence or otherwise of a nuclear programme, the questions surrounding technology acquisition and alternative energy investments - against which the Sizewell decision should be viewed. (author)

  1. State Electricity Regulatory Policy and Distributed Resources: Distributed Resources and Electric System Reliability

    Energy Technology Data Exchange (ETDEWEB)

    Cowart, R.; Harrington, C.; Moskovitz, D.; Shirley, W.; Weston, F.; Sedano, R.

    2002-10-01

    Designing and implementing credit-based pilot programs for distributed resources distribution is a low-cost, low-risk opportunity to find out how these resources can help defer or avoid costly electric power system (utility grid) distribution upgrades. This report describes implementation options for deaveraged distribution credits and distributed resource development zones. Developing workable programs implementing these policies can dramatically increase the deployment of distributed resources in ways that benefit distributed resource vendors, users, and distribution utilities. This report is one in the State Electricity Regulatory Policy and Distributed Resources series developed under contract to NREL (see Annual Technical Status Report of the Regulatory Assistance Project: September 2000-September 2001, NREL/SR-560-32733). Other titles in this series are: (1) Accommodating Distributed Resources in Wholesale Markets, NREL/SR-560-32497; (2) Distributed Resources and Electric System Re liability, NREL/SR-560-32498; (3) Distribution System Cost Methodologies for Distributed Generation, NREL/SR-560-32500; (4) Distribution System Cost Methodologies for Distributed Generation Appendices, NREL/SR-560-32501.

  2. Reliability measurement for mixed mode failures of 33/11 kilovolt electric power distribution stations.

    Directory of Open Access Journals (Sweden)

    Faris M Alwan

    Full Text Available The reliability of the electrical distribution system is a contemporary research field due to diverse applications of electricity in everyday life and diverse industries. However a few research papers exist in literature. This paper proposes a methodology for assessing the reliability of 33/11 Kilovolt high-power stations based on average time between failures. The objective of this paper is to find the optimal fit for the failure data via time between failures. We determine the parameter estimation for all components of the station. We also estimate the reliability value of each component and the reliability value of the system as a whole. The best fitting distribution for the time between failures is a three parameter Dagum distribution with a scale parameter [Formula: see text] and shape parameters [Formula: see text] and [Formula: see text]. Our analysis reveals that the reliability value decreased by 38.2% in each 30 days. We believe that the current paper is the first to address this issue and its analysis. Thus, the results obtained in this research reflect its originality. We also suggest the practicality of using these results for power systems for both the maintenance of power systems models and preventive maintenance models.

  3. Breast Cancer Epidemiology in Gulf Cooperation Council Countries: A Regional and International Comparison.

    Science.gov (United States)

    Albeshan, Salman M; Mackey, Martin G; Hossain, Syeda Z; Alfuraih, Abdulrahman A; Brennan, Patrick C

    2017-07-13

    Breast cancer is the most frequently diagnosed noncutaneous malignancy in women living in Gulf Cooperation Council countries. The present report aimed to highlight the similarities and variations in breast cancer incidence, age at diagnosis, clinicopathologic features, molecular characteristics, and lifestyle factors that contribute to an increasing incidence of breast cancer compared with neighboring Arab and westernized countries. The data presented, although having important implications for policy makers, also highlights the need for further research. Such research would ensure that effective prevention and detection strategies are tailored to the specific needs of the Gulf women such that the management of breast cancer is optimized. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Scoping study on trends in the economic value of electricity reliability to the U.S. economy; TOPICAL

    International Nuclear Information System (INIS)

    Eto, Joseph; Koomey, Jonathan; Lehman, Bryan; Martin, Nathan; Mills, Evan; Webber, Carrie; Worrell, Ernst

    2001-01-01

    During the past three years, working with more than 150 organizations representing public and private stakeholders, EPRI has developed the Electricity Technology Roadmap. The Roadmap identifies several major strategic challenges that must be successfully addressed to ensure a sustainable future in which electricity continues to play an important role in economic growth. Articulation of these anticipated trends and challenges requires a detailed understanding of the role and importance of reliable electricity in different sectors of the economy. This report is intended to contribute to that understanding by analyzing key aspects of trends in the economic value of electricity reliability in the U.S. economy. We first present a review of recent literature on electricity reliability costs. Next, we describe three distinct end-use approaches for tracking trends in reliability needs: (1) an analysis of the electricity-use requirements of office equipment in different commercial sectors; (2) an examination of the use of aggregate statistical indicators of industrial electricity use and economic activity to identify high reliability-requirement customer market segments; and (3) a case study of cleanrooms, which is a cross-cutting market segment known to have high reliability requirements. Finally, we present insurance industry perspectives on electricity reliability as an example of a financial tool for addressing customers' reliability needs

  5. Scoping study on trends in the economic value of electricity reliability to the U.S. economy

    Energy Technology Data Exchange (ETDEWEB)

    Eto, Joseph; Koomey, Jonathan; Lehman, Bryan; Martin, Nathan; Mills, Evan; Webber, Carrie; Worrell, Ernst

    2001-06-01

    During the past three years, working with more than 150 organizations representing public and private stakeholders, EPRI has developed the Electricity Technology Roadmap. The Roadmap identifies several major strategic challenges that must be successfully addressed to ensure a sustainable future in which electricity continues to play an important role in economic growth. Articulation of these anticipated trends and challenges requires a detailed understanding of the role and importance of reliable electricity in different sectors of the economy. This report is intended to contribute to that understanding by analyzing key aspects of trends in the economic value of electricity reliability in the U.S. economy. We first present a review of recent literature on electricity reliability costs. Next, we describe three distinct end-use approaches for tracking trends in reliability needs: (1) an analysis of the electricity-use requirements of office equipment in different commercial sectors; (2) an examination of the use of aggregate statistical indicators of industrial electricity use and economic activity to identify high reliability-requirement customer market segments; and (3) a case study of cleanrooms, which is a cross-cutting market segment known to have high reliability requirements. Finally, we present insurance industry perspectives on electricity reliability as an example of a financial tool for addressing customers' reliability needs.

  6. Electric field measurements in the auroral E region

    International Nuclear Information System (INIS)

    Mahon, H.P.; Smiddy, M.; Sagalyn, R.C.

    1975-01-01

    Dipole electric field, positive ion and electron densities and temperatures, vehicle potential, and plasma sheath measurements have been made in the auroral E region by means of rockets flown from Fort Churchill, Canada. These results are described and compared over the altitude region 100 to 165 km. On a rocket flight launched on 10 December 1969 during very quiet conditions, adjacent to a stable, low intensity auroral arc, the plasma density and temperatures are found to be high and the electric fields large and steady. Electric field components of the order of -17 mv m -1 to +6 mv m -1 were measured along the Earth's magnetic field. The plasma results indicate that these fields may be contributing to enhanced electron temperatures. On a flight of 9 March 1970 during a large magnetic storm with widespread auroral activity, lower plasma densities and temperatures and much smaller and more erratic electric fields were observed with no significant component parallel to the magnetic field. (auth)

  7. Regional Variability and Uncertainty of Electric Vehicle Life Cycle CO₂ Emissions across the United States.

    Science.gov (United States)

    Tamayao, Mili-Ann M; Michalek, Jeremy J; Hendrickson, Chris; Azevedo, Inês M L

    2015-07-21

    We characterize regionally specific life cycle CO2 emissions per mile traveled for plug-in hybrid electric vehicles (PHEVs) and battery electric vehicles (BEVs) across the United States under alternative assumptions for regional electricity emission factors, regional boundaries, and charging schemes. We find that estimates based on marginal vs average grid emission factors differ by as much as 50% (using National Electricity Reliability Commission (NERC) regional boundaries). Use of state boundaries versus NERC region boundaries results in estimates that differ by as much as 120% for the same location (using average emission factors). We argue that consumption-based marginal emission factors are conceptually appropriate for evaluating the emissions implications of policies that increase electric vehicle sales or use in a region. We also examine generation-based marginal emission factors to assess robustness. Using these two estimates of NERC region marginal emission factors, we find the following: (1) delayed charging (i.e., starting at midnight) leads to higher emissions in most cases due largely to increased coal in the marginal generation mix at night; (2) the Chevrolet Volt has higher expected life cycle emissions than the Toyota Prius hybrid electric vehicle (the most efficient U.S. gasoline vehicle) across the U.S. in nearly all scenarios; (3) the Nissan Leaf BEV has lower life cycle emissions than the Prius in the western U.S. and in Texas, but the Prius has lower emissions in the northern Midwest regardless of assumed charging scheme and marginal emissions estimation method; (4) in other regions the lowest emitting vehicle depends on charge timing and emission factor estimation assumptions.

  8. Thermal Management and Reliability of Automotive Power Electronics and Electric Machines

    Energy Technology Data Exchange (ETDEWEB)

    Narumanchi, Sreekant V [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bennion, Kevin S [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cousineau, Justine E [National Renewable Energy Laboratory (NREL), Golden, CO (United States); DeVoto, Douglas J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Feng, Xuhui [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kekelia, Bidzina [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Kozak, Joseph P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Major, Joshua [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Moreno, Gilberto [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Paret, Paul P [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Tomerlin, Jeff J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-09

    Low-cost, high-performance thermal management technologies are helping meet aggressive power density, specific power, cost, and reliability targets for power electronics and electric machines. The National Renewable Energy Laboratory is working closely with numerous industry and research partners to help influence development of components that meet aggressive performance and cost targets through development and characterization of cooling technologies, and thermal characterization and improvements of passive stack materials and interfaces. Thermomechanical reliability and lifetime estimation models are important enablers for industry in cost-and time-effective design.

  9. Electric Power Infrastructure Reliability And Security Research And Development Initiative. Final report

    International Nuclear Information System (INIS)

    Dale, S.; Meeker, R.; Steurer, M.; Li, H.; Pamidi, S.; Rodrigo, H.; Suryanarayanan, S.; Cartes, D.; Ordonez, J.; Domijan, A.; Liu, W.; Cox, D.; McLaren, P.; Hovsapian, R.; Edwards, D.; Simmons, S.; Wilde, N.; Woodruff, S.; Kopriva, D.; Hussaini, Y.; Mohammed, O.; Zheng, J.; Baldwin, T.L.

    2008-01-01

    This is the final scientific/technical report for the Electric Power Infrastructure Reliability and Security R and D Initiative sponsored by the U.S. Department of Energy, Office of Electricity Delivery and Energy Reliability, under award number DE-FG02-05CH11292. This report covers results from the FSU-led, multi-institution effort conducted over the period 8/15/05 to 10/14/2007. Building upon existing infrastructure for power systems research, modeling, and simulation, the Center for Advanced Power Systems (CAPS) at Florida State University (FSU) is developing world-class programs in electric power systems research and education to support future electric power system needs and challenges. With U.S. Department of Energy Support, FSU CAPS has engaged in a multi-faceted effort to conduct basic and applied research towards understanding, developing, and deploying technologies and approaches that can lead to improved reliability and security of the North American electric power generation and delivery infrastructure. This wide-reaching project, through a number of carefully selected thrusts cutting across several research disciplines, set out to address key terrestrial electric utility power system issues and challenges. The challenges and the thrusts to address them were arrived at through analysis of a number of national reports and recommendations combined with input from an experienced multi-disciplined team of power systems research staff and faculty at FSU CAPS. The resulting project effort can be grouped into four major areas: - Power Systems and New Technology Insertion - Controls, Protection, and Security - Simulation Development - High Temperature Superconductivity (HTS)

  10. Electric power monthly, August 1998, with data for May 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 9 refs., 57 tabs.

  11. Electric power monthly, March 1999 with data for December 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be sued in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 63 tabs.

  12. Electric power monthly, May 1998, with data for February 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974. The EPM provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. 30 refs., 58 tabs.

  13. Electric power monthly, December 1997 with data for September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 63 tabs.

  14. Electric power monthly, May 1995 with data for February 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-24

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisiommakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuel, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  15. On reliability and maintenance modelling of ageing equipment in electric power systems

    International Nuclear Information System (INIS)

    Lindquist, Tommie

    2008-04-01

    Maintenance optimisation is essential to achieve cost-efficiency, availability and reliability of supply in electric power systems. The process of maintenance optimisation requires information about the costs of preventive and corrective maintenance, as well as the costs of failures borne by both electricity suppliers and customers. To calculate expected costs, information is needed about equipment reliability characteristics and the way in which maintenance affects equipment reliability. The aim of this Ph.D. work has been to develop equipment reliability models taking the effect of maintenance into account. The research has focussed on the interrelated areas of condition estimation, reliability modelling and maintenance modelling, which have been investigated in a number of case studies. In the area of condition estimation two methods to quantitatively estimate the condition of disconnector contacts have been developed, which utilise results from infrared thermography inspections and contact resistance measurements. The accuracy of these methods were investigated in two case studies. Reliability models have been developed and implemented for SF6 circuit-breakers, disconnector contacts and XLPE cables in three separate case studies. These models were formulated using both empirical and physical modelling approaches. To improve confidence in such models a Bayesian statistical method incorporating information from the equipment design process was also developed. This method was illustrated in a case study of SF6 circuit-breaker operating rods. Methods for quantifying the effect of maintenance on equipment condition and reliability have been investigated in case studies on disconnector contacts and SF6 circuit-breakers. The input required by these methods are condition measurements and historical failure and maintenance data, respectively. This research has demonstrated that the effect of maintenance on power system equipment may be quantified using available data

  16. Natural-gas-powered thermoelectricity as a reliability factor in the Brazilian electric sector

    International Nuclear Information System (INIS)

    Fernandes, E.; Oliveira, J.C.S. de; de Oliveira, P.R.; Alonso, P.S.R.

    2008-01-01

    The introduction of natural-gas-powered thermoelectricity into the Brazilian generation sector can be considered as a very complex energy, economic, regulatory and institutional revision. Brazil is a country with very specific characteristics in electricity generation, as approximately 80% of the generating capacity is based on hydroelectricity, showing strong dependency on rain and management of water reservoirs. A low rate of investment in the Brazilian Electricity Industry in the period of 1995-2000, associated with periods of low rainfall, led to a dramatic lowering of the water stocks in the reservoirs. With this scenario and the growing supply of natural gas, both from within Brazil and imported, natural gas thermal electric plants became a good option to diversify the electrical supply system. In spite of the Brazilian Government's efforts to install such plants, the country was faced with severe electricity rationing in 2001. The objective of this work is to show the need to continue with the implementation of natural gas thermal electricity projects, in a manner that allows flexibility and guarantees greater working reliability for the entire Brazilian electricity sector. Taking into account the world trend towards renewable energy, the perspectives of usage of biofuels in the Brazilian Energy Matrix and in electrical energy generation are also analyzed. The very issue of electrical power efficiency in Brazil and its challenges and strategic proposals from the standpoint of Government Programs and results provided so far are presented. The technological constraints in order to put on stream the thermal electric plants are also analyzed. The article concludes with a positive perspective of the usage of natural gas as to be the third pillar in the Brazilian Energy Matrix for the years to come

  17. Disparity in regional cerebral blood flow during electrically induced seizure

    DEFF Research Database (Denmark)

    Sestoft, D; Meden, P; Hemmingsen, R

    1993-01-01

    This is a presentation of 2 cases in which the intraictal regional cerebral blood flow distribution was measured with the 99mTc-HMPAO single photon emission computerized tomography technique during an electrically induced seizure. Although the seizure was verified as generalized on electroencepha......This is a presentation of 2 cases in which the intraictal regional cerebral blood flow distribution was measured with the 99mTc-HMPAO single photon emission computerized tomography technique during an electrically induced seizure. Although the seizure was verified as generalized...... electroencephalography-verified generalized seizures....

  18. THE ANALYSIS OF STRUCTURAL RELIABILITY OF THE MAIN ELECTRIC CONNECTION CIRCUITS OF NUCLEAR POWER PLANTS

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2017-01-01

    Full Text Available The reliability of the main circuit of electrical connections at a nuclear electric power plant that has two units with a capacity of 1,200 MW each has been determined. Reliability, economical, maneuverable properties of the atomic power plant under study are largely determined by its main circuit, so the choice of the circuit for the design and its status in the process of operation occur to be critical objectives. Main electrical connection circuits in nuclear electric power plants are selected on the basis of the schematic networks of the energy system and the land attached to the plant. The circuit of the connection of a nuclear power plant to the grid in the original normal operating modes at all stages of the construction of such a plant should provide the outcome of the full added capacity of a nuclear power plant and the preservation of its stability in the power system without the influence of the emergency system automatics when any outgoing transmission line is disabled. When selecting the main circuit the individual capacity of the installed units and their number are taken into account as well as the order of development of the plant and power supply system; the voltage on which the power of a plant is delivered; a shortcircuit current for switchgear high voltage and the need for their limitation by circuit means; the most power that can be lost when damage to any switch. A model of reliability of the main circuit of electrical connections is designed to detect all types of accidents that are possible at the coincidence of failures of elements with the repair and operational modes that differs in composition and damageability of the equipment, as well as under conditions of the development of accidents due to failure of operation of devices of relay protection and automation.

  19. Seasonal anomalies in electricity intensity across Chinese regions

    International Nuclear Information System (INIS)

    Herrerias, M.J.

    2013-01-01

    Highlights: ► We analyze seasonal anomalies in electricity intensity in China. ► Regional and time dimensions are investigated from 2003 to 2009. ► Results suggest that seasonality is stochastic. ► We find four main effects: Summer, Winter, Spring and Lunar New Year effects. ► Differences are observed between northern regions and east-south of China. - Abstract: This paper provides evidence on the relevance of modeling the seasonal nature of electricity intensity across Chinese regions in a suitable manner with monthly data from 2003 to 2009. In contrast to previous works, this study relaxes the assumption of deterministic seasonality, allowing for time and regional variation in the Chinese economy. In doing so, unobserved-components models are used to analyze the type of seasonality – stochastic or deterministic – that prevails. Regional differences in the seasonal patterns and their evolution over time are also examined. Results provide new empirical evidence on the stochastic nature of electricity intensity in the majority of the provinces. In addition, we find four main effects as regards seasonal patterns: (i) Lunar New Year, (ii) Summer, (iii) Spring, and (iv) Winter effects. In the first two effects seasonality becomes positive, thus indicating that electricity intensity increases, and the last two are negative, showing improvements in the use of electricity per unit of output. However, differences are observed between northern regions and the east-south of China. In addition, once we control our estimates for temperature and prices, no significant differences are seen in the results. Conclusions from this analysis are useful for empirical modeling in the energy-economics literature, and also for designing energy policies to improve the efficiency of the use of energy resources across Chinese regions

  20. Electrical system design and reliability at Ontario Hydro nuclear generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Royce, C. J. [Ontario Hydro, 700 University Avenue, Toronto, Ontario M5G 1X6 (Canada)

    1986-02-15

    This paper provides an overview of design practice and the predicted and actual reliability of electrical station service Systems at Ontario Nuclear Generating Stations. Operational experience and licensing changes have indicated the desirability of improving reliability in certain instances. For example, the requirement to start large emergency coolant injection pumps resulted in the turbine generator units in a multi-unit station being used as a back-up power supply. Results of reliability analyses are discussed. To mitigate the effects of common mode events Ontario Hydro adopted a 'two group' approach to the design of safety related Systems. This 'two group' approach is reviewed and a single fully environmentally qualified standby power supply is proposed for future use. (author)

  1. Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market

    International Nuclear Information System (INIS)

    Hemmati, Reza; Hooshmand, Rahmat-Allah; Khodabakhshian, Amin

    2013-01-01

    Highlights: • Generation expansion planning is presented in deregulated electricity market. • Wind farm uncertainty is modeled in the problem. • The profit of each GENCO is maximized and also the safe operation of system is satisfied. • Salve sector is managed as an optimization programming and solved by using PSO technique. • Master sector is considered in pool market and Cournot model is used to simulate it. - Abstract: This paper addresses reliability constrained generation expansion planning (GEP) in the presence of wind farm uncertainty in deregulated electricity market. The proposed GEP aims at maximizing the expected profit of all generation companies (GENCOs), while considering security and reliability constraints such as reserve margin and loss of load expectation (LOLE). Wind farm uncertainty is also considered in the planning and GENCOs denote their planning in the presence of wind farm uncertainty. The uncertainty is modeled by probability distribution function (PDF) and Monte-Carlo simulation (MCS) is used to insert uncertainty into the problem. The proposed GEP is a constrained, nonlinear, mixed-integer optimization programming and solved by using particle swarm optimization (PSO) method. In this paper, Electricity market structure is modeled as a pool market. Simulation results verify the effectiveness and validity of the proposed planning for maximizing GENCOs profit in the presence of wind farms uncertainties in electricity market

  2. The Challenge Posed by Geomagnetic Activity to Electric Power Reliability: Evidence From England and Wales

    Science.gov (United States)

    Forbes, Kevin F.; St. Cyr, O. C.

    2017-10-01

    This paper addresses whether geomagnetic activity challenged the reliability of the electric power system during part of the declining phase of solar cycle 23. Operations by National Grid in England and Wales are examined over the period of 11 March 2003 through 31 March 2005. This paper examines the relationship between measures of geomagnetic activity and a metric of challenged electric power reliability known as the net imbalance volume (NIV). Measured in megawatt hours, NIV represents the sum of all energy deployments initiated by the system operator to balance the electric power system. The relationship between geomagnetic activity and NIV is assessed using a multivariate econometric model. The model was estimated using half-hour settlement data over the period of 11 March 2003 through 31 December 2004. The results indicate that geomagnetic activity had a demonstrable effect on NIV over the sample period. Based on the parameter estimates, out-of-sample predictions of NIV were generated for each half hour over the period of 1 January to 31 March 2005. Consistent with the existence of a causal relationship between geomagnetic activity and the electricity market imbalance, the root-mean-square error of the out-of-sample predictions of NIV is smaller; that is, the predictions are more accurate, when the statistically significant estimated effects of geomagnetic activity are included as drivers in the predictions.

  3. Regional corrections and checking the reliability of geomagnetic forecasts

    International Nuclear Information System (INIS)

    Afanas'eva, V.I.; Shevnin, A.D.

    1978-01-01

    Regional corrections of the K index mark estimate with respect to the Moskva observatory are reviewed in order to improve the short-range forecast of the geomagnetic activity and to promote it within the aqua area. The forecasts of the storms of all categories and weak perturbations have been verified for the predominant days in the catalogue of the magnetic storms family. It is shown that the adopted methods of forecasts yield considerably good results for weak perturbations as well as for weak and moderate magnetic storms. Strong and very strong storms are less predictable

  4. Electric propulsion reliability: Statistical analysis of on-orbit anomalies and comparative analysis of electric versus chemical propulsion failure rates

    Science.gov (United States)

    Saleh, Joseph Homer; Geng, Fan; Ku, Michelle; Walker, Mitchell L. R.

    2017-10-01

    With a few hundred spacecraft launched to date with electric propulsion (EP), it is possible to conduct an epidemiological study of EP's on orbit reliability. The first objective of the present work was to undertake such a study and analyze EP's track record of on orbit anomalies and failures by different covariates. The second objective was to provide a comparative analysis of EP's failure rates with those of chemical propulsion. Satellite operators, manufacturers, and insurers will make reliability- and risk-informed decisions regarding the adoption and promotion of EP on board spacecraft. This work provides evidence-based support for such decisions. After a thorough data collection, 162 EP-equipped satellites launched between January 1997 and December 2015 were included in our dataset for analysis. Several statistical analyses were conducted, at the aggregate level and then with the data stratified by severity of the anomaly, by orbit type, and by EP technology. Mean Time To Anomaly (MTTA) and the distribution of the time to (minor/major) anomaly were investigated, as well as anomaly rates. The important findings in this work include the following: (1) Post-2005, EP's reliability has outperformed that of chemical propulsion; (2) Hall thrusters have robustly outperformed chemical propulsion, and they maintain a small but shrinking reliability advantage over gridded ion engines. Other results were also provided, for example the differentials in MTTA of minor and major anomalies for gridded ion engines and Hall thrusters. It was shown that: (3) Hall thrusters exhibit minor anomalies very early on orbit, which might be indicative of infant anomalies, and thus would benefit from better ground testing and acceptance procedures; (4) Strong evidence exists that EP anomalies (onset and likelihood) and orbit type are dependent, a dependence likely mediated by either the space environment or differences in thrusters duty cycles; (5) Gridded ion thrusters exhibit both

  5. Drought and Heat Wave Impacts on Electricity Grid Reliability in Illinois

    Science.gov (United States)

    Stillwell, A. S.; Lubega, W. N.

    2016-12-01

    A large proportion of thermal power plants in the United States use cooling systems that discharge large volumes of heated water into rivers and cooling ponds. To minimize thermal pollution from these discharges, restrictions are placed on temperatures at the edge of defined mixing zones in the receiving waters. However, during extended hydrological droughts and heat waves, power plants are often granted thermal variances permitting them to exceed these temperature restrictions. These thermal variances are often deemed necessary for maintaining electricity reliability, particularly as heat waves cause increased electricity demand. Current practice, however, lacks tools for the development of grid-scale operational policies specifying generator output levels that ensure reliable electricity supply while minimizing thermal variances. Such policies must take into consideration characteristics of individual power plants, topology and characteristics of the electricity grid, and locations of power plants within the river basin. In this work, we develop a methodology for the development of these operational policies that captures necessary factors. We develop optimal rules for different hydrological and meteorological conditions, serving as rule curves for thermal power plants. The rules are conditioned on leading modes of the ambient hydrological and meteorological conditions at the different power plant locations, as the locations are geographically close and hydrologically connected. Heat dissipation in the rivers and cooling ponds is modeled using the equilibrium temperature concept. Optimal rules are determined through a Monte Carlo sampling optimization framework. The methodology is applied to a case study of eight power plants in Illinois that were granted thermal variances in the summer of 2012, with a representative electricity grid model used in place of the actual electricity grid.

  6. Analysis and design of hybrid electric regional turboprop aircraft

    NARCIS (Netherlands)

    Voskuijl, M.; van Bogaert, J.; Gangoli Rao, A.

    2017-01-01

    The potential environmental benefits of hybrid electric regional turboprop aircraft in terms of fuel consumption are investigated. Lithium–air batteries are used as energy source in combination with conventional fuel. A validated design and analysis framework is extended with sizing and analysis

  7. Mantle electrical conductivity profile of Niger delta region

    Indian Academy of Sciences (India)

    The mantle electrical conductivity-depth profile of the Niger delta region in Nigeria has been determined using solar quiet day ionospheric current (Sq).The magnetometer data obtained in 2010 from geomagnetic stations installed in Lagos by magnetic dataset (MAGDAS) in 2008 and data from magnetometers installed in ...

  8. 75 FR 40819 - Reliability Standards Development and NERC and Regional Entity Enforcement; Notice Soliciting...

    Science.gov (United States)

    2010-07-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD10-14-000] Reliability Standards Development and NERC and Regional Entity Enforcement; Notice Soliciting Comments July 7, 2010... technical conference to explore issues pertaining to the development of mandatory Reliability Standards for...

  9. 75 FR 65964 - Version One Regional Reliability Standard for Resource and Demand Balancing

    Science.gov (United States)

    2010-10-27

    ... this record and, thus, does not persuade us.\\35\\ \\33\\ WECC's analysis shows that, over the past 15... notes that the currently approved regional Reliability Standard was established through negotiations in...

  10. 77 FR 43190 - Regional Reliability Standard PRC-006-SERC-01-Automatic Underfrequency Load Shedding Requirements

    Science.gov (United States)

    2012-07-24

    ..., Oklahoma, Arkansas, Louisiana, Texas and Florida). The SERC Region is currently geographically divided into... Requirement itself and directed NERC to make that requirement explicit in future versions of the Reliability..., 888 First Street NE., [[Page 43195

  11. Methods of formation of efficiency indexes of electric power sources integration in regional electric power systems

    International Nuclear Information System (INIS)

    Marder, L.I.; Myzin, A.I.

    1993-01-01

    A methodic approach to the grounding of the integration process efficiency within the Unified electric power system is given together with the selection of a rational areal structure and concentration of power-generating source capacities. Formation of an economic functional according to alternative scenavies including the cost components taking account of the regional interests is considered. A method for estimation and distribution of the effect from electric power production integration in the power systems under new economic conditions is proposed

  12. Development of the Japanese version of the Council on Nutrition Appetite Questionnaire and its simplified versions, and evaluation of their reliability, validity, and reproducibility.

    Science.gov (United States)

    Tokudome, Yuko; Okumura, Keiko; Kumagai, Yoshiko; Hirano, Hirohiko; Kim, Hunkyung; Morishita, Shiho; Watanabe, Yutaka

    2017-11-01

    Because few Japanese questionnaires assess the elderly's appetite, there is an urgent need to develop an appetite questionnaire with verified reliability, validity, and reproducibility. We translated and back-translated the Council on Nutrition Appetite Questionnaire (CNAQ), which has eight items, into Japanese (CNAQ-J), as well as the Simplified Nutritional Appetite Questionnaire (SNAQ-J), which includes four CNAQ-J-derived items. Using structural equation modeling, we examined the CNAQ-J structure based on data of 649 Japanese elderly people in 2013, including individuals having a certain degree of cognitive impairment, and we developed the SNAQ for the Japanese elderly (SNAQ-JE) according to an exploratory factor analysis. Confirmatory factor analyses on the appetite questionnaires were conducted to probe fitting to the model. We computed Cronbach's α coefficients and criterion-referenced/-related validity figures examining associations of the three appetite battery scores with body mass index (BMI) values and with nutrition-related questionnaire values. Test-retest reproducibility of appetite tools was scrutinized over an approximately 2-week interval. An exploratory factor analysis demonstrated that the CNAQ-J was constructed of one factor (appetite), yielding the SNAQ-JE, which includes four questions derived from the CNAQ-J. The three appetite instruments showed almost equivalent fitting to the model and reproducibility. The CNAQ-J and SNAQ-JE demonstrated satisfactory reliability and significant criterion-referenced/-related validity values, including BMIs, but the SNAQ-J included a low factor-loading item, exhibited less satisfactory reliability and had a non-significant relationship to BMI. The CNAQ-J and SNAQ-JE may be applied to assess the appetite of Japanese elderly, including persons with some cognitive impairment. Copyright © 2017 The Authors. Production and hosting by Elsevier B.V. All rights reserved.

  13. Controlled Operation of the Islanded Portion of the International Council on Large Electric Systems (CIGRE Low Voltage Distribution Network

    Directory of Open Access Journals (Sweden)

    Ghullam Mustafa Bhutto

    2017-07-01

    Full Text Available In islanding, a portion of the power network, comprised of the loads and distributed generation (DG units, is isolated from the rest of the power grid and forms a micro grid (MG. In this condition, it becomes essential for the islanded MG to operate in a stable and controlled manner by providing ancillary services. When the MG is cut off from the main grid, the islanding must be detected by the DG units. In this condition it is essential that one of the controllers should be switched to the voltage-frequency (VF control mode. In islanding, the network loses it slack reference and this reference is established by a VF controller. The voltage and the frequency of the islanded MG deviate when disconnected from the transmission grid and these deviations are caused by the load-generation imbalance. The voltage and the frequency of the islanded MG can be restored to the permissible limits if the desired/exceeded amount of active and reactive power is injected/absorbed by the locally available sources in islanded MG. This paper proposes a control strategy which can compensate the voltage and the frequency deviations in the islanded portion of the International Council on Large Electric Systems (CIGRE low voltage distribution network by using advanced power electronics devices such as STATCOMs for Photovoltaic (PV Units and Battery Energy Storage Systems (BESS STATCOMs (for battery units. The selection of the VF controller for the most suitable DG unit of this test network is also presented in this paper, and the effectiveness of the controllers is verified by presenting simulation results using DIgSILENT (DIgSILENT GmbH, Gomaringen, Germany power factory software version 15.0.

  14. Regional projections of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Smolen, G.R.; Delene, J.G.; Fuller, L.C.; Bowers, H.I.

    1983-12-01

    The total busbar electric generating costs were estimated for locations in ten regions of the United States for base load nuclear and coal-fired power plants with a startup date of January 1995. A complete data set is supplied which specifies each parameter used to obtain the comparative results. When the comparison is based on reference cost parameters, nuclear- and coal-fired generation costs are found to be very close in most regions of the country. Nuclear power is favored in the South Atlantic region where coal must be transported over long distances, while coal-fired generation is favored in the Central and North Central regions where large reserves of cheaply mineable coal exist. The reference data set reflects recent electric utility construction experience. Significantly lower nuclear capital investment costs would result if regulatory reform and improved construction practices were instituted. The electric power generation costs for base load oil- and natural gas-fired plants were also estimated. These plants were found to be noncompetitive in all regions for those scenarios most likely to develop. Generation cost sensitivity to changes in various parameters was examined at a reference location. The sensitivity parameters included capital investment costs, lead times, capacity factors, costs of money, and coal and uranium prices. In addition to the levelized lifetime costs, year-by-year cash flows and revenue requirements are presented. The report concludes with an analysis of the economic merits of recycling spent fuel in light-water reactors

  15. A Regional Time-of-Use Electricity Price Based Optimal Charging Strategy for Electrical Vehicles

    Directory of Open Access Journals (Sweden)

    Jun Yang

    2016-08-01

    Full Text Available With the popularization of electric vehicles (EVs, the out-of-order charging behaviors of large numbers of EVs will bring new challenges to the safe and economic operation of power systems. This paper studies an optimal charging strategy for EVs. For that a typical urban zone is divided into four regions, a regional time-of-use (RTOU electricity price model is proposed to guide EVs when and where to charge considering spatial and temporal characteristics. In light of the elastic coefficient, the user response to the RTOU electricity price is analyzed, and also a bilayer optimization charging strategy including regional-layer and node-layer models is suggested to schedule the EVs. On the one hand, the regional layer model is designed to coordinate the EVs located in different time and space. On the other hand, the node layer model is built to schedule the EVs to charge in certain nodes. According to the simulations of an IEEE 33-bus distribution network, the performance of the proposed optimal charging strategy is verified. The results demonstrate that the proposed bilayer optimization strategy can effectively decrease the charging cost of users, mitigate the peak-valley load difference and the network loss. Besides, the RTOU electricity price shows better performance than the time-of-use (TOU electricity price.

  16. Electric power monthly, July 1999, with data for April 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    The Electric Power Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the Electric Power Monthly (EPM). This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatt hour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 1 fig., 64 tabs.

  17. Electric power monthly, December 1996 with data for September 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The report presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatt hour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 57 tabs.

  18. High-reliability microcontroller nerve stimulator for assistance in regional anaesthesia procedures.

    Science.gov (United States)

    Ferri, Carlos A; Quevedo, Antonio A F

    2017-07-01

    In the last decades, the use of nerve stimulators to aid in regional anaesthesia has been shown to benefit the patient since it allows a better location of the nerve plexus, leading to correct positioning of the needle through which the anaesthetic is applied. However, most of the nerve stimulators available in the market for this purpose do not have the minimum recommended features for a good stimulator, and this can lead to risks to the patient. Thus, this study aims to develop an equipment, using embedded electronics, which meets all the characteristics, for a successful blockade. The system is made of modules for generation and overall control of the current pulse and the patient and user interfaces. The results show that the designed system fits into required specifications for a good and reliable nerve stimulator. Linearity proved satisfactory, ensuring accuracy in electrical current amplitude for a wide range of body impedances. Field tests have proven very successful. The anaesthesiologist that used the system reported that, in all cases, plexus blocking was achieved with higher quality, faster anaesthetic diffusion and without needed of an additional dose when compared with same procedure without the use of the device.

  19. Impact of nuclear fuel performance and reliability in a deregulated electricity market

    International Nuclear Information System (INIS)

    Barnoski, M.; Kaiser, B.

    1997-01-01

    US nuclear plants are now placing a great deal of importance on fuel performance and reliability because of their direct effect on a plant's capacity factor, availability, operating flexibility, outage duration, and worker exposure. This is reflected by utilities making fuel reliability a principal vendor evaluation criterion and making fuel performance an important bonus/penalty provision. Defect-free fuel, combined with ever improving design features, makes it possible for plants to operate at higher outputs while reducing operating and maintenance costs. Higher electrical output at lower cost is essential for US nuclear plants to meet the expected competition in a deregulated market. Through continued investment in manufacturing improvements and a vigilant, systematic design process, ABB's nuclear fuel has contributed to helping its nuclear utility customers reduce their cost of doing business. (author) 1 fig., 1 tab

  20. Coal-Powered Electric Generating Unit Efficiency and Reliability Dialogue: Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, Emmanuel [Energetics, Inc., Columbia, MD (United States)

    2018-02-01

    Coal continues to play a critical role in powering the Nation’s electricity generation, especially for baseload power plants. With aging coal generation assets facing decreased performance due to the state of the equipment, and with challenges exacerbated by the current market pressures on the coal sector, there are opportunities to advance early-stage technologies that can retrofit or replace equipment components. These changes will eventually result in significant improvements in plant performance once further developed and deployed by industry. Research and development in areas such as materials, fluid dynamics, fuel properties and preparation characteristics, and a new generation of plant controls can lead to new components and systems that can help improve the efficiency and reliability of coal-fired power plants significantly, allowing these assets to continue to provide baseload power. Coal stockpiles at electricity generation plants are typically large enough to provide 30 to 60 days of power prior to resupply—significantly enhancing the stability and reliability of the U.S. electricity sector. Falling prices for non-dispatchable renewable energy and mounting environmental regulations, among other factors, have stimulated efforts to improve the efficiency of these coal-fired electric generating units (EGUs). In addition, increased reliance on natural gas and non-dispatchable energy sources has spurred efforts to further increase the reliability of coal EGUs. The Coal Powered EGU Efficiency and Reliability Dialogue brought together stakeholders from across the coal EGU industry to discuss methods for improvement. Participants at the event reviewed performance-enhancing innovations in coal EGUs, discussed the potential for data-driven management practices to increase efficiency and reliability, investigated the impacts of regulatory compliance on coal EGU performance, and discussed upcoming challenges for the coal industry. This report documents the key

  1. Regional analysis of the nuclear-electricity; Analisis regional de la nucleoelectricidad

    Energy Technology Data Exchange (ETDEWEB)

    Parera, M. D., E-mail: dparera@cnea.gov.ar [CNEA, Gerencia de Planificacion, Coordinacion y Control, Subgerencia de Planificacion Estrategica, Av. Gral. Paz 1499, B1650KNA San Martin, Buenos Aires (Argentina)

    2011-11-15

    In this study was realized a regional analysis of the Argentinean electric market contemplating the effects of regional cooperation, the internal and international interconnections; and the possibilities of insert of new nuclear power stations were evaluated in different regions of the country, indicating the most appropriate areas to carry out these facilities to increase the penetration of the nuclear energy in the national energy matrix. Also was studied the interconnection of the electricity and natural gas markets, due to the existent linking among both energy forms. With this purpose the program Message (Model for energy supply strategy alternatives and their general environmental impacts) was used, promoted by the International Atomic Energy Agency. This model carries out an economic optimization level country, obtaining the minimum cost as a result for the modeling system. The division for regions realized by the Compania Administradora del Mercado Mayorista Electrico (CAMMESA) was used, which divides to the country in eight regions. They were considered the characteristics and necessities of each one of them, their respective demands and offers of electric power and natural gas, as well as their existent and projected interconnections, composed by the electric lines and gas pipes. According to the results obtained through the model, the nuclear-electricity is a competitive option. (Author)

  2. Generation adequacy and transmission interconnection in regional electricity markets

    International Nuclear Information System (INIS)

    Cepeda, Mauricio; Saguan, Marcelo; Finon, Dominique; Pignon, Virginie

    2009-01-01

    The power system capacity adequacy has public good features that cannot be entirely solved by electricity markets. Regulatory intervention is then necessary and established methods have been used to assess adequacy and help regulators to fix this market failure. In regional electricity markets, transmission interconnections play an important role in contributing to adequacy. However, the adequacy problem and related policy are typically considered at a national level. This paper presents a simple model to study how the interconnection capacity interacts with generation adequacy. First results indicate that increasing interconnection capacity between systems improves adequacy up to a certain level; further increases do not procure additional adequacy improvements. Furthermore, besides adequacy improvement, increasing transmission capacity under asymmetric adequacy criteria or national system characteristics could create several concerns about externalities. These results imply that regional coordination of national adequacy policies is essential to internalise adequacy of cross-border effects.

  3. Risk-based methods for reliability investments in electric power distribution systems

    Energy Technology Data Exchange (ETDEWEB)

    Alvehag, Karin

    2011-07-01

    Society relies more and more on a continuous supply of electricity. However, while under investments in reliability lead to an unacceptable number of power interruptions, over investments result in too high costs for society. To give incentives for a socio economically optimal level of reliability, quality regulations have been adopted in many European countries. These quality regulations imply new financial risks for the distribution system operator (DSO) since poor reliability can reduce the allowed revenue for the DSO and compensation may have to be paid to affected customers. This thesis develops a method for evaluating the incentives for reliability investments implied by different quality regulation designs. The method can be used to investigate whether socio economically beneficial projects are also beneficial for a profit-maximizing DSO subject to a particular quality regulation design. To investigate which reinvestment projects are preferable for society and a DSO, risk-based methods are developed. With these methods, the probability of power interruptions and the consequences of these can be simulated. The consequences of interruptions for the DSO will to a large extent depend on the quality regulation. The consequences for the customers, and hence also society, will depend on factors such as the interruption duration and time of occurrence. The proposed risk-based methods consider extreme outage events in the risk assessments by incorporating the impact of severe weather, estimating the full probability distribution of the total reliability cost, and formulating a risk-averse strategy. Results from case studies performed show that quality regulation design has a significant impact on reinvestment project profitability for a DSO. In order to adequately capture the financial risk that the DSO is exposed to, detailed riskbased methods, such as the ones developed in this thesis, are needed. Furthermore, when making investment decisions, a risk

  4. METHODS OF IMPROVING THE RELIABILITY OF THE CONTROL SYSTEM TRACTION POWER SUPPLY OF ELECTRIC TRANSPORT BASED ON AN EXPERT INFORMATION

    Directory of Open Access Journals (Sweden)

    O. O. Matusevych

    2009-03-01

    Full Text Available The author proposed the numerous methods of solving the multi-criterion task – increasing of reliability of control system on the basis of expert information. The information, which allows choosing thoughtfully the method of reliability increasing for a control system of electric transport, is considered.

  5. National Hydroelectric Power Resources Study: Regional Assessment: Volume XXII: Western Systems Coordinating Council, (WSCC). Volume 22

    Science.gov (United States)

    1981-09-01

    largest combustion- turbine plants, both over 200 MW, are the Harborton facility in Portland, Oregon, owned by Portland General Electric, and Agua ...SUU 110 Sl/U CJt SUU III Ii/U :r 93 SUU 94 Si/U W 95 IlIU U Si/U 97 SlIU 98 SitU 99 SlIU 100 Si/U 101 SlIU 102 Si/U 103 Fl RlIV 104 01 R2...YNNNYNN * * S 2 * MARICOPA AGUA FRIA elV. 112 lb.l * UP * 103800 * 1500 * 32b5 * 57.781 * * * AS * MCM~CD PI * tij~9 * 60.0* 170,8 * 1500 * l2bS

  6. 75 FR 66702 - Western Electric Coordinating Council; Qualified Transfer Path Unscheduled Flow Relief Regional...

    Science.gov (United States)

    2010-10-29

    ..., stating that ``IRO-006-WECC-1 provides entities with the necessary motivation to curtail off-path... notification of Unscheduled Flow Events, calculate and display required relief, and provide a rapid method of... of Management and Budget (OMB) regulations require approval of certain information collection...

  7. The Council of Regional Accrediting Commissions Framework for Competency-Based Education: A Grounded Theory Study

    Science.gov (United States)

    Butland, Mark James

    2017-01-01

    Colleges facing pressures to increase student outcomes while reducing costs have shown an increasing interest in competency-based education (CBE) models. Regional accreditors created a joint policy on CBE evaluation. Two years later, through this grounded theory study, I sought to understand from experts the nature of this policy, its impact, and…

  8. Generation-distribution of electric power in France and in its regions in 2004 and 2005

    International Nuclear Information System (INIS)

    2007-09-01

    This report presents the temporary results for the year 2005 of the power generation and transportation/distribution in France. Power generation data come from the official exhaustive annual inquiry acknowledged by the national council of statistical information (CNIS). It concerns all power producers, like EDF, Compagnie Nationale du Rhone (CNR), Societe Nationale d'Electricite et de Thermique (SNET), Societe Hydroelectrique du Midi (SHEM), and some independent producers who generate electricity for their own needs or for the supply of the grid (about 3000 companies). Data relative to power transportation and distribution are established by another administrative annual inquiry addressed to utilities (EDF-Reseau de Distribution, local distribution companies) and to the power transportation network manager (RTE EDF-Transport). The statistical results presented in this document are established from data settled on June 11, 2007. In a context of market liberalization, these two inquiries are of particular importance. They represent a measurement tool of the public authorities' action in favor of the security of supplies, and they allow to have available a detailed, reliable and regularly updated description of France's power generation and transportation facilities by energy source and by geographical area. (J.S.)

  9. Risk Reduction Methods for Managing the Development of Regional Electric Power Industry

    Directory of Open Access Journals (Sweden)

    Mikhail Kozhevnikov

    2017-11-01

    Full Text Available The development of the regional electric power industry has come to the forefront due to the changing scale, quality, and configuration of electric power infrastructure, and the spread of distributed generation. This gives rise to more stringent requirements regarding the reliability, safety, and environmental impact of electric power supply. This article aims to justify a package of methods that make it possible to identify and minimize investment, production, financial, and environmental risks in order to ensure sustainable development of the regional electric power industry that performs anti-crisis functions, and of individual energy companies. The key method to be employed is integrated resource planning (IRP. As a part of the method, energy conservation, renewable energy sources, and combined heat and power production are considered as equally valid ways of meeting future demand. The authors have designed a methodology for taking into account uncertainty and risk when implementing IRP. The methodology includes analysis of scenarios and decision making processes by calculating past and projected values of profit indicators. When conducting the environmental and economic assessment of an investment project in the electric power industry, the authors suggest using an aggregate indicator of environmental and economic effectiveness that is calculated on the basis of a combination of locally significant positive and negative environmental and economic impacts of the project. The authors formulate conceptual provisions that serve as the foundation for a promising model of the regional electric power industry and which contain recommendations for managing the development of the industry while minimizing organizational, market, and technological risks.

  10. On the complex analysis of the reliability, safety, and economic efficiency of atomic electric power stations

    International Nuclear Information System (INIS)

    Emel'yanov, I.Ya.; Klemin, A.I.; Polyakov, E.F.

    1977-01-01

    The problem is posed of effectively increasing the engineering performance of nuclear electric power stations (APS). The principal components of the engineering performance of modern large APS are considered: economic efficiency, radiation safety, reliability, and their interrelationship. A nomenclature is proposed for the quantitative indices which most completely characterize the enumerated properties and are convenient for the analysis of the engineering performance. The urgent problem of developing a methodology for the complex analysis and optimization of the principal performance components is considered; this methodology is designed to increase the efficiency of the work on high-performance competitive APS. The principle of complex optimization of the reliability, safety, and economic-efficiency indices is formulated; specific recommendations are made for the practical realization of this principle. The structure of the complex quantiative analysis of the enumerated performance components is given. The urgency and promise of the complex approach to solving the problem of APS optimization is demonstrated, i.e., the solution of the problem of creating optimally reliable, fairly safe, and maximally economically efficient stations

  11. Recent developments in the U.S. and their relevance to Ontario's electricity sector

    International Nuclear Information System (INIS)

    Shalaby, A.

    2005-01-01

    Canada supplies nearly 100 per cent of U.S. electricity imports. By 2025, U.S. energy demand is expected to rise by 30 per cent. This PowerPoint presentation examined the relevance of recent developments in the United States to Ontario's electricity sector. A chart of U.S.-Canada energy trade from 1990 to 2002 was presented. It was noted that the Federal Energy Regulatory Commission (FERC) has increased its emphasis on reliability in response to recommendations by the U.S.-Canada Power System Outage Task Force Report. The creation of the Electric Reliability Organization (ERO) was discussed. An outline of the current reliability framework was presented, along with a map of National Electric Reliability Council (NERC) regions. Issues concerning mandatory compliance with reliability standards were examined with reference to various provinces in Canada. It was noted that achieving mandatory and enforceable standards in the U.S. has been a high priority for Canadian entities. An overview of U.S. legislation relating to reliability standards was presented. An outline of current and proposed regional transmission organizations (RTOs) in North America was presented, along with outlines of their reliability and planning protocols. A map of current transmission lines was presented. The implications of independent system operator (ISO) and RTO developments for Ontario were reviewed. Issues concerning emissions reductions and renewable energy credits trading were discussed. It was concluded that reliability legislation will be a positive development for Ontario, Canada, and U.S. jurisdictions. tabs., figs

  12. STRUCTURAL FLUCTUATIONS, ELECTRICAL RESPONSE AND THE RELIABILITY OF NANOSTRUCTURES (FINAL REPORT)

    Energy Technology Data Exchange (ETDEWEB)

    Philip J. Rous; Ellen D. Williams; Michael S. Fuhrer

    2006-07-31

    The goal of the research supported by DOE-FG02-01ER45939 was to synthesize a number of experimental and theoretical approaches to understand the relationship between morphological fluctuations, the electrical response and the reliability (failure) of metallic nanostructures. The primary focus of our work was the study of metallic nanowires which we regard as prototypical of nanoscale interconnects. Our research plan has been to link together these materials properties and behaviors by understanding the phenomenon of, and the effects of electromigration at nanometer length scales. The thrust of our research has been founded on the concept that, for nanostructures where the surface-to-volume ratio is necessarily high, surface diffusion is the dominant mass transport mechanism that governs the fluctuations, electrical properties and failure modes of nanostructures. Our approach has been to develop experimental methods that permit the direct imaging of the electromagnetic distributions within nanostructures, their structural fluctuations and their electrical response. This experimental research is complemented by a parallel theoretical and computational program that describes the temporal evolution of nanostructures in response to current flow.

  13. Dynamic Self-Adaptive Reliability Control for Electric-Hydraulic Systems

    Directory of Open Access Journals (Sweden)

    Yi Wan

    2015-02-01

    Full Text Available The high-speed electric-hydraulic proportional control is a new development of the hydraulic control technique with high reliability, low cost, efficient energy, and easy maintenance; it is widely used in industrial manufacturing and production. However, there are still some unresolved challenges, the most notable being the requirements of high stability and real-time by the classical control algorithm due to its high nonlinear characteristics. We propose a dynamic self-adaptive mixed control method based on the least squares support vector machine (LSSVM and the genetic algorithm for high-speed electric-hydraulic proportional control systems in this paper; LSSVM is used to identify and adjust online a nonlinear electric-hydraulic proportional system, and the genetic algorithm is used to optimize the control law of the controlled system and dynamic self-adaptive internal model control and predictive control are implemented by using the mixed intelligent method. The internal model and the inverse control model are online adjusted together. At the same time, a time-dependent Hankel matrix is constructed based on sample data; thus finite dimensional solution can be optimized on finite dimensional space. The results of simulation experiments show that the dynamic characteristics are greatly improved by the mixed intelligent control strategy, and good tracking and high stability are met in condition of high frequency response.

  14. Electric-stress reliability and current collapse of different thickness SiNx passivated AlGaN/GaN high electron mobility transistors

    International Nuclear Information System (INIS)

    Ling, Yang; Gui-Zhou, Hu; Yue, Hao; Xiao-Hua, Ma; Si, Quan; Li-Yuan, Yang; Shou-Gao, Jiang

    2010-01-01

    This paper investigates the impact of electrical degradation and current collapse on different thickness SiN x passivated AlGaN/GaN high electron mobility transistors. It finds that higher thickness SiN x passivation can significantly improve the high-electric-field reliability of a device. The degradation mechanism of the SiN x passivation layer under ON-state stress has also been discussed in detail. Under the ON-state stress, the strong electric-field led to degradation of SiN x passivation located in the gate-drain region. As the thickness of SiN x passivation increases, the density of the surface state will be increased to some extent. Meanwhile, it is found that the high NH 3 flow in the plasma enhanced chemical vapour deposition process could reduce the surface state and suppress the current collapse. (condensed matter: electronic structure, electrical, magnetic, and optical properties)

  15. Analyzing the topological, electrical and reliability characteristics of a power transmission system for identifying its critical elements

    International Nuclear Information System (INIS)

    Zio, E.; Golea, L.R.

    2012-01-01

    The subject of this paper is the analysis of an electrical transmission system with the objective of identifying its most critical elements with respect to failures and attacks. The methodological approach undertaken is based on graph-theoretical (topological) network analysis. Four different perspectives of analysis are considered within the formalism of weighed networks, adding to the purely topological analysis of the system, the reliability and electrical characteristics of its components. In each phase of the analysis: i) a graph-theoretical representation is offered to highlight the structure of the most important system connections according to the particular characteristics examined (topological, reliability, electrical or electrical-reliability), ii) the classical degree index of a network node is extended to account for the different characteristics considered. The application of these concepts of analysis to an electrical transmission system of literature confirms the importance of different perspectives of analysis on such a critical infrastructure. - Highlights: ► We analyze a power system from topological, reliability and electrical perspectives. ► We rank critical components within a vulnerability assessment framework. ► We compute an extended degree to rank critical energy paths. ► We compare several analytical approaches and provide a table for choosing among them. ► We suggest network changes to increase the reliability of highly loaded energy paths.

  16. Green electricity externalities: Forest biomass in an Atlantic European Region

    International Nuclear Information System (INIS)

    Solino, M.; Prada, A.; Vazquez, M.X.

    2009-01-01

    Renewable energy sources are expected to represent a growing proportion of the primary energy sources for the production of electricity. Environmental and social reasons support this tendency. European and Spanish energy plans assign a role of primary importance to biomass in general and, especially, to forest biomass for the period up to 2010. This paper reviews, organises and quantifies the potentials and values of this renewable resource in the foremost Spanish Region in terms of silviculture. The non-market externalities (environmental, economic and social) are classified, and some of them are quantified to present a synthesis of the benefits of a partial substitution of fossil fuels by forest biomass for electricity generation. (author)

  17. Electric power monthly, June 1995 with data for March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-19

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 68 tabs.

  18. Electric power monthly with data for December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  19. Electric power monthly with data for January 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-04-01

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  20. Electric power monthly, September 1996, with data for June 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatt hour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  1. Electric power monthly with data for October 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  2. A reliable method for intracranial electrode implantation and chronic electrical stimulation in the mouse brain.

    Science.gov (United States)

    Jeffrey, Melanie; Lang, Min; Gane, Jonathan; Wu, Chiping; Burnham, W McIntyre; Zhang, Liang

    2013-08-06

    Electrical stimulation of brain structures has been widely used in rodent models for kindling or modeling deep brain stimulation used clinically. This requires surgical implantation of intracranial electrodes and subsequent chronic stimulation in individual animals for several weeks. Anchoring screws and dental acrylic have long been used to secure implanted intracranial electrodes in rats. However, such an approach is limited when carried out in mouse models as the thin mouse skull may not be strong enough to accommodate the anchoring screws. We describe here a screw-free, glue-based method for implanting bipolar stimulating electrodes in the mouse brain and validate this method in a mouse model of hippocampal electrical kindling. Male C57 black mice (initial ages of 6-8 months) were used in the present experiments. Bipolar electrodes were implanted bilaterally in the hippocampal CA3 area for electrical stimulation and electroencephalographic recordings. The electrodes were secured onto the skull via glue and dental acrylic but without anchoring screws. A daily stimulation protocol was used to induce electrographic discharges and motor seizures. The locations of implanted electrodes were verified by hippocampal electrographic activities and later histological assessments. Using the glue-based implantation method, we implanted bilateral bipolar electrodes in 25 mice. Electrographic discharges and motor seizures were successfully induced via hippocampal electrical kindling. Importantly, no animal encountered infection in the implanted area or a loss of implanted electrodes after 4-6 months of repetitive stimulation/recording. We suggest that the glue-based, screw-free method is reliable for chronic brain stimulation and high-quality electroencephalographic recordings in mice. The technical aspects described this study may help future studies in mouse models.

  3. Planning Mechanisms for Regional Electric Power Supply System Development

    Directory of Open Access Journals (Sweden)

    Evgeniy Anatolyevich Malyshev

    2015-12-01

    Full Text Available Key problems of the regional electric power supply systems are examined. These problems result from a lack of regulated interaction mechanisms for uniting the different entities’ resources aimed at the realization of investment activities. One of the main problems of the power supply industry is physical and moral aging of both generating and networking equipment. In the article, the necessity of management system formation to control the development of power sector has been proved. The deficiencies of the modern investment procedure in power companies are described. The absence of continuity between the regional and local strategic planning documents and investment planning of a power company has been found out. The possibility to develop a new mechanism for attracting investment has been proposed. The regulation of joint activities to implement the development program for the regional power supply industry has been proposed. The management system to develop the Russian power industry has been proposed. The comparative analysis of generating capacity development mechanisms has been carried out, such as capacity supply agreement (CSA, investment support mechanism (ISM, and long-term power market (LPM. The interaction procedure of the planning of the power supply infrastructure development has been described. The mechanism connecting the state sectoral and regional planning and corporate planning of power supply infrastructure development has been proposed. The regional aspects of industrial policy and its legislative support have been considered. To successfully implement the public-private-partnership (PPP projects, it is necessary to create the effective PPP model within the federal and regional legislation framework; to develop the financial model providing the recoverability of investments; to provide a mutually beneficial cooperation between executive bodies and private investors. The possibility to apply the PPP mechanism for regional

  4. The Role of Business in Regional Governance: The Case of the APEC Business Advisory Council (ABAC in APEC

    Directory of Open Access Journals (Sweden)

    Elizaveta Safonkina

    2016-11-01

    Full Text Available In the modern globalized world, the international relations landscape is like a cake decorated with powder and other toppings. The international agenda is determined by the traditional actors – states (“flour, milk and other ingredients without which the cake could not be baked” as set out in the theory of liberal intergovernmentalism. But a large number of non-governmental actors (“the decorative powder and toppings, but the cake is edible without them” present their proposals and initiatives to the states, which states reflect on in their official documents. These proposals and initiatives tend to be mainly aligned with the states’ policies. This dialogue is important in making the international decision-making process legitimate, but does not mean that non-governmental actors are fully engaged in designing the international cooperation agenda. In this article the author tests this hypothesis through studying the APEC Business Advisory Council (ABAC.The author explores how the Asia-Pacific business priorities promoted by ABAC since its establishment in 1996 correspond with the key objectives and policies of the Asia-Pacific Economic Cooperation (APEC forum as well as ABAC’s internal and external communication model to access the ABAC actorness. The official ABAC and APEC documents constituted the evidence base for the analysis. Research methods include qualitative content and comparative historical analyses. The author concludes that ABAC has the characteristics of a formal actor in Asia-Pacific regional governance. It could therefore be considered a full-fledged partner in the APEC leaders’ documents although ABAC has no capacity to change the regional agenda. From an economic perspective, this phenomenon could be explained by the fact that the states and businesses in the region have common interests because states need business-led growth and business needs the robust competition that trade and investment liberalization can

  5. Quantification of ventilation distribution in regional lung injury by electrical impedance tomography and xenon computed tomography

    International Nuclear Information System (INIS)

    Elke, Gunnar; Weiler, Norbert; Frerichs, Inéz; Fuld, Matthew K; Halaweish, Ahmed F; Hoffman, Eric A; Grychtol, Bartłomiej

    2013-01-01

    Validation studies of electrical impedance tomography (EIT) based assessment of regional ventilation under pathological conditions are required to prove that EIT can reliably quantify heterogeneous ventilation distribution with sufficient accuracy. The objective of our study was to validate EIT measurements of regional ventilation through a comparison with xenon-multidetector-row computed tomography (XeCT) in an animal model of sub-lobar lung injury. Nine anesthetized mechanically ventilated supine pigs were examined before and after the induction of lung injury in two adjacent sub-lobar segments of the right lung by saline lavage or endotoxin instillation. Regional ventilation was determined in 32 anteroposterior regions of interest in the right and left lungs and the ventilation change quantified by difference images between injury and control. Six animals were included in the final analysis. Measurements of regional ventilation by EIT and XeCT correlated well before (r s = 0.89 right, r s = 0.90 left lung) and after local injury (r s = 0.79 and 0.92, respectively). No bias and narrow limits of agreement were found during both conditions. The ventilation decrease in the right injured lung was correspondingly measured by both modalities (5.5%±1.1% by EIT and 5.4%±1.9% by XeCT, p = 0.94). EIT was inferior to clearly separate the exact anatomical location of the regional injuries. Regional ventilation was overestimated (<2%) in the most ventral and dorsal regions and underestimated (2%) in the middle regions by EIT compared to XeCT. This study shows that EIT is able to reliably discern even small ventilation changes on sub-lobar level. (paper)

  6. Review of the human reliability analysis performed for Empire State Electric Energy Research Corporation

    International Nuclear Information System (INIS)

    Swart, D.; Banz, I.

    1985-01-01

    The Empire State Electric Energy Research Corporation (ESEERCO) commissioned Westinghouse to conduct a human reliability analysis to identify and quantify human error probabilities associated with operator actions for four specific events which may occur in light water reactors: loss of coolant accident, steam generator tube rupture, steam/feed line break, and stuck open pressurizer spray valve. Human Error Probabilities (HEPs) derived from Swain's Technique for Human Error Rate Prediction (THERP) were compared to data obtained from simulator exercises. A correlation was found between the HEPs derived from Swain and the results of the simulator data. The results of this study provide a unique insight into human factors analysis. The HEPs obtained from such probabilistic studies can be used to prioritize scenarios for operator training situations, and thus improve the correlation between simulator exercises and real control room experiences

  7. Efforts to improve safety and reliability of nuclear power plants in Kyushu Electric Power

    International Nuclear Information System (INIS)

    Yamamoto, Satoshi

    2014-01-01

    After the Fukushima accident, Kyushu Electric Power Co. took emergency safety measures requested by government to ensure power supply, coolant supply pumps and cooling water so as to keep cooling fuels in the reactor and spent fuel storage pool in case of losses of ordinary cooling capability caused by earthquake and tsunami. In order to improve safety and reliability of nuclear power plants, further efforts based on lessons learned from the Fukushima accident had been made to diversify corresponding equipment of safety measures in terms of prevention of core damage, prevention of containment failure, mitigation of radioactive materials release, cooling of spent fuel pit and ensurance of power supply, and to enhance emergency response capability so as to make operational management more complete. Additional safety measures applicable to new regulatory requirements against severe accidents were in progress. This article introduced details of such activities. (T. Tanaka)

  8. Economic evaluation of reliability-centred maintenance (RCM): an electricity transmission industry perspective

    International Nuclear Information System (INIS)

    Bowler, D.J.; Primrose, P.L.; Leonard, R.

    1995-01-01

    Traditional approaches to appraising the introduction of reliability centred maintenance (RCM) are shown to exhibit severe limitations. In particular, the economic implications surrounding its adoption are repeatedly mis-stated, with the consequence that organisations may be investing in unprofitable RCM ventures. Previously quoted benefits are examined and, contrary to established opinion, it is shown that these 'generalised' statements, once redeemed, are able to be quantified. The paper then proceeds to describe a financial methodology, developed by NGC and UMIST, by which the introduction of RCM can be evaluated. Moreover, it shows that, by regarding RCM as an investment decision, rather than an 'act of faith', the economic viability of a potential application can be determined before vital resources are committed. Finally, it is demonstrated that when the methodology is applied within the context of the electricity transmission industry, the economic case underlying the adoption of RCM can be realistically appraised. (author)

  9. Engineering of electrical systems of nuclear power stations for improved reliability

    International Nuclear Information System (INIS)

    Narasinga Rao, S.N.; Ramanathan, K.; Choudhary, N.N.

    1977-01-01

    Operational problems experienced in electrical systems/equipment of the Tarapur Atomic Power Station (TAPS) and the Rajasthan Atomic Power Station (RAPS) and their solutions are dealt in detail. This experience has led to new design concepts which are being introduced for improved reliability in design of the Madras Atomic Power Project (MAPP) and the Narora Atomic Power Project (NAPP). Saline pollution on switchyard equipments was the major problem of the TAPS due to its coastal location. Saline pollution resulted in flash over of insulators and failure of clamps. The problem was solved by suitable changes in insulators, conductors, transformers, switches and arranging portable live line washing of the switchyard equipment. In MAPP which is also located on coast, an indoor switchyard is built. NAPP is located in a seismic zone, therefore, all equipment is specified for appropriate seismic duty. Various other improvements are described. (M.G.B.)

  10. Allegheny County Council Districts

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This dataset portrays the boundaries of the County Council Districts in Allegheny County. The dataset is based on municipal boundaries and City of Pittsburgh ward...

  11. Reliability of Power Units in Poland and the World

    Directory of Open Access Journals (Sweden)

    Józef Paska

    2015-09-01

    Full Text Available One of a power system’s subsystems is the generation subsystem consisting of power units, the reliability of which to a large extent determines the reliability of the power system and electricity supply to consumers. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. They are compared and analysed on the basis of data published by the Energy Market Agency (Poland, NERC (North American Electric Reliability Corporation – USA, and WEC (World Energy Council. Deficiencies and the lack of a unified national system for collecting and processing electric power equipment unavailability data are also indicated.

  12. 77 FR 59151 - Regional Reliability Standard PRC-006-NPCC-1-Automatic Underfrequency Load Shedding

    Science.gov (United States)

    2012-09-26

    ... approval. The proposed regional Reliability Standard applies to generator owners, planning coordinators... Commission, Secretary of the Commission, 888 First Street NE., Washington, DC 20426. Instructions: For... Commission, 888 First Street NE., Washington, DC 20426, Telephone: (202) 502-6750, [email protected

  13. Reliability Indicators of Urban Electric Network Schemes for Supply of Second and Third Category Consumers

    Directory of Open Access Journals (Sweden)

    M. A. Korotkevich

    2012-01-01

    Full Text Available The paper considers two schemes of the urban distributive electric network for supply of the second and third category consumers for whom indicators of reliability have been determined.As for a network scheme of the 2nd category it has been determined that while installing low-oil and vacuum switches at a distributive point the most remote transformer substation has the highest non-availability  factor which is higher of the corresponding non-availability  factor of the nearest transformer substation by 1,21–1,23 fold  accordingly.As for a network scheme of the 3rd category consumers it has been obtained the data that reliability of consumers receiving supply from bus-bars of transformer substations with 0,38 kW voltage changes  significantly (by 1,2–1,9-fold while changing a breakpoint of the network with 10 kW voltage.

  14. A Sequential Kriging reliability analysis method with characteristics of adaptive sampling regions and parallelizability

    International Nuclear Information System (INIS)

    Wen, Zhixun; Pei, Haiqing; Liu, Hai; Yue, Zhufeng

    2016-01-01

    The sequential Kriging reliability analysis (SKRA) method has been developed in recent years for nonlinear implicit response functions which are expensive to evaluate. This type of method includes EGRA: the efficient reliability analysis method, and AK-MCS: the active learning reliability method combining Kriging model and Monte Carlo simulation. The purpose of this paper is to improve SKRA by adaptive sampling regions and parallelizability. The adaptive sampling regions strategy is proposed to avoid selecting samples in regions where the probability density is so low that the accuracy of these regions has negligible effects on the results. The size of the sampling regions is adapted according to the failure probability calculated by last iteration. Two parallel strategies are introduced and compared, aimed at selecting multiple sample points at a time. The improvement is verified through several troublesome examples. - Highlights: • The ISKRA method improves the efficiency of SKRA. • Adaptive sampling regions strategy reduces the number of needed samples. • The two parallel strategies reduce the number of needed iterations. • The accuracy of the optimal value impacts the number of samples significantly.

  15. A reliability design method for a lithium-ion battery pack considering the thermal disequilibrium in electric vehicles

    Science.gov (United States)

    Xia, Quan; Wang, Zili; Ren, Yi; Sun, Bo; Yang, Dezhen; Feng, Qiang

    2018-05-01

    With the rapid development of lithium-ion battery technology in the electric vehicle (EV) industry, the lifetime of the battery cell increases substantially; however, the reliability of the battery pack is still inadequate. Because of the complexity of the battery pack, a reliability design method for a lithium-ion battery pack considering the thermal disequilibrium is proposed in this paper based on cell redundancy. Based on this method, a three-dimensional electric-thermal-flow-coupled model, a stochastic degradation model of cells under field dynamic conditions and a multi-state system reliability model of a battery pack are established. The relationships between the multi-physics coupling model, the degradation model and the system reliability model are first constructed to analyze the reliability of the battery pack and followed by analysis examples with different redundancy strategies. By comparing the reliability of battery packs of different redundant cell numbers and configurations, several conclusions for the redundancy strategy are obtained. More notably, the reliability does not monotonically increase with the number of redundant cells for the thermal disequilibrium effects. In this work, the reliability of a 6 × 5 parallel-series configuration is the optimal system structure. In addition, the effect of the cell arrangement and cooling conditions are investigated.

  16. Recent developments in the U.S. and their relevance to Ontario's electricity sector

    Energy Technology Data Exchange (ETDEWEB)

    Shalaby, A. [Independent Electricity System Operator, Toronto, ON (Canada)

    2005-07-01

    Canada supplies nearly 100 per cent of U.S. electricity imports. By 2025, U.S. energy demand is expected to rise by 30 per cent. This PowerPoint presentation examined the relevance of recent developments in the United States to Ontario's electricity sector. A chart of U.S.-Canada energy trade from 1990 to 2002 was presented. It was noted that the Federal Energy Regulatory Commission (FERC) has increased its emphasis on reliability in response to recommendations by the U.S.-Canada Power System Outage Task Force Report. The creation of the Electric Reliability Organization (ERO) was discussed. An outline of the current reliability framework was presented, along with a map of National Electric Reliability Council (NERC) regions. Issues concerning mandatory compliance with reliability standards were examined with reference to various provinces in Canada. It was noted that achieving mandatory and enforceable standards in the U.S. has been a high priority for Canadian entities. An overview of U.S. legislation relating to reliability standards was presented. An outline of current and proposed regional transmission organizations (RTOs) in North America was presented, along with outlines of their reliability and planning protocols. A map of current transmission lines was presented. The implications of independent system operator (ISO) and RTO developments for Ontario were reviewed. Issues concerning emissions reductions and renewable energy credits trading were discussed. It was concluded that reliability legislation will be a positive development for Ontario, Canada, and U.S. jurisdictions. tabs., figs.

  17. THE RELIABILITY ANALYSIS OF EXISTING REINFORCED CONCRETE PILES IN PERMAFROST REGIONS

    Directory of Open Access Journals (Sweden)

    Vladimir S. Utkin

    2017-06-01

    Full Text Available The article describes the general problem of safe operation of buildings and structures with the dynamics of permafrost in Russia and other countries. The global warming on Earth will lead to global disasters such as failures of buildings and structures. The main reason of these failures will be a reduction of bearing capacity and the reliability of foundations. It is necessary to organize the observations (monitoring for the process of reducing the bearing capacity of foundations to prevent such accidents and reduce negative consequences, to development of preventive measures and operational methods for the piles reliability analysis. The main load-bearing elements of the foundation are reinforced concrete piles and frozen ground. Reinforced concrete piles have a tendency to decrease the bearing capacity and reliability of the upper (aerial part and the part in the soil. The article discusses the problem of reliability analysis of existing reinforced concrete piles in upper part in permafrost regions by the reason of pile degradation in the contact zone of seasonal thawing and freezing soil. The evaluation of the probability of failure is important in itself, but also it important for the reliability of foundation: consisting of piles and frozen soil. Authors offers the methods for reliability analysis of upper part of reinforced concrete piles in the contact zone with seasonally thawed soil under different number of random variables (fuzzy variables in the design mathematical model of a limit state by the strength criterion.

  18. HEMP emergency planning and operating procedures for electric power systems. Power Systems Technology Program

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1991-12-31

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E{sub 1} (steep-front pulse) component and the late time E{sub 3} (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council`s regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  19. Electric Power Monthly, July 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-12

    The Electric Power Monthly (EPM) is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, cost of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost in fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 12 refs., 4 figs., 48 tabs.

  20. Electric power monthly, January 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels

  1. Electric power monthly, February 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-16

    The Electric Power Monthly (EMP) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  2. Electric power monthly, January 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-26

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  3. Electric power monthly, October 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-20

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels.

  4. Improving electrical power systems reliability through locally controlled distributed curtailable load

    Science.gov (United States)

    Dehbozorgi, Mohammad Reza

    2000-10-01

    Improvements in power system reliability have always been of interest to both power companies and customers. Since there are no sizable electrical energy storage elements in electrical power systems, the generated power should match the load demand at any given time. Failure to meet this balance may cause severe system problems, including loss of generation and system blackouts. This thesis proposes a methodology which can respond to either loss of generation or loss of load. It is based on switching of electric water heaters using power system frequency as the controlling signal. The proposed methodology encounters, and the thesis has addressed, the following associated problems. The controller must be interfaced with the existing thermostat control. When necessary to switch on loads, the water in the tank should not be overheated. Rapid switching of blocks of load, or chattering, has been considered. The contributions of the thesis are: (A) A system has been proposed which makes a significant portion of the distributed loads connected to a power system to behave in a predetermined manner to improve the power system response during disturbances. (B) The action of the proposed system is transparent to the customers. (C) The thesis proposes a simple analysis for determining the amount of such loads which might be switched and relates this amount to the size of the disturbances which can occur in the utility. (D) The proposed system acts without any formal communication links, solely using the embedded information present system-wide. (E) The methodology of the thesis proposes switching of water heater loads based on a simple, localized frequency set-point controller. The thesis has identified the consequent problem of rapid switching of distributed loads, which is referred to as chattering. (F) Two approaches have been proposed to reduce chattering to tolerable levels. (G) A frequency controller has been designed and built according to the specifications required to

  5. Competitive electric power markets and grid reliability : something has changed during the past decade

    International Nuclear Information System (INIS)

    Fluckiger, K.

    2005-01-01

    This white paper reviewed some of the fundamental changes in the way in which electricity is provided to customers. Previously, electricity was delivered by integrated electric utilities that owned both generation and transmission and directly served their customers. Restructuring altered the rules that govern control, operation, ownership and regulation of the industry. The traditional integrated utility has been disaggregated. Wholesale electricity costs are no longer regulated and prices are now set by supply and demand in a market context. Generation investment decisions are based on future expectations of market performance. It was suggested that transmission should become a facilitator of the competitive market. Inter-ties are an essential part of a competitive market, as a means to import power when needed and to export surplus energy. The role of transmission in facilitating new generation by providing non-discriminatory and efficient transport to the market was discussed. It was noted that the lack of transmission investment is resulting in economic penalties, rising losses and constraints on more economic generators. Transmission congestion is counterproductive to the interests of customers. A move away from regional planning to a recognition of the wider interconnectedness of the system was recommended. The current practice of deferring necessary maintenance as a way to generate short-term profit was examined. It was noted that despite the need for new transmission infrastructure, investment in merchant alternating current projects has been slow to materialize. Other challenges to transmission included the uncertainty of regulatory processes and investment recovery as well as the unpredictability of flow patterns in the bulk power system. It was concluded that competitive generation markets will not work with an inadequate transmission infrastructure. Transmission enables new generation by ensuring non-discriminatory and efficient transport to market

  6. 18-month outlook : an assessment of the reliability of the Ontario Electricity System

    International Nuclear Information System (INIS)

    2005-01-01

    This paper provides an 18 month forecast of the Ontario electricity system, as well as an outline of activities and recent developments relating to the issue of reliability. An additional aim of the paper was to identify potentially adverse conditions that may require adjustment or coordination of maintenance plans for generation and transmission equipment. Requests for proposals (RFPs) for renewable generation within the specified time-frame were also discussed, as well as the return to service of Ontario Power Generation's Pickering Unit 1. Reduced reserve levels for the summer of 2005 were anticipated, and details of forecasted peak demand, generator maintenance, new generation and price-responsive demand adjustments and forced outage rates were presented. It was suggested that adequate market mechanisms were in place to manage reserve levels. Developments concerning the new Parkway Transformer station were reviewed. A resource outlook was provided. Available resources were expected to exceed planning requirements with the exception of 6 weeks in the summer of 2005. A projected capacity increase was also anticipated, due to the return of Pickering 1 and an additional 515 MW in the fall of 2005. Price-responsive demands were forecasted to exceed 650 MW due to increases in dispatchable load. It was suggested that in order to ensure power demand during peak periods, imports may be required under extreme weather conditions, combined with the possible deferral or cancellation of generation maintenance. Transmission impacts due to shutdowns were discussed. Voltage system requirements were reviewed, along with details of the installation of additional shunt capacitors and transformer controls. The electricity market was reviewed in the context of current overall economic conditions. Data forecasting normal peak demand was presented for the entire outlook period. 19 tabs., 10 figs

  7. Electric power monthly, June 1998, with data for March 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and Us levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 5 refs., 57 tabs.

  8. INCREASING RELIABILITY OF STEPPED AUTOMATIC STARTING AND RHEOSTAT BREAKING SYSTEM OF ELECTRIC TRAINS ER9T AND EPL9T

    Directory of Open Access Journals (Sweden)

    N. H. Visin

    2010-06-01

    Full Text Available The article examines transitional processes in the power circuit of tractive motors and their influence on the work of stepped automatic starting of electric trains ER9T and EPL9T. The recommendations for increasing the reliability of operation of multiple-unit rolling stock are proposed.

  9. Spacecraft electrical power subsystem: Failure behavior, reliability, and multi-state failure analyses

    International Nuclear Information System (INIS)

    Kim, So Young; Castet, Jean-Francois; Saleh, Joseph H.

    2012-01-01

    This article investigates the degradation and failure behavior of spacecraft electrical power subsystem (EPS) on orbit. First, this work provides updated statistical reliability and multi-state failure analyses of spacecraft EPS and its different constituents, namely the batteries, the power distribution, and the solar arrays. The EPS is shown to suffer from infant mortality and to be a major driver of spacecraft unreliability. Over 25% of all spacecraft failures are the result of EPS failures. As a result, satellite manufacturers may wish to pursue targeted improvement to this subsystem, either through better testing or burn-in procedures, better design or parts selection, or additional redundancy. Second, this work investigates potential differences in the EPS degradation and failure behavior for spacecraft in low earth orbits (LEO) and geosynchronous orbits (GEO). This analysis was motivated by the recognition that the power/load cycles and the space environment are significantly different in LEO and GEO, and as such, they may result in different failure behavior for the EPS in these two types of orbits. The results indicate, and quantify the extent to which, the EPS fails differently in LEO and GEO, both in terms of frequency and severity of failure events. A casual summary of the findings can be stated as follows: the EPS fails less frequently but harder (with fatal consequences to the spacecraft) in LEO than in GEO.

  10. Incorporating reliability evaluation into the uncertainty analysis of electricity market price

    International Nuclear Information System (INIS)

    Kang, Chongqing; Bai, Lichao; Xia, Qing; Jiang, Jianjian; Zhao, Jing

    2005-01-01

    A novel model and algorithm for analyzing the uncertainties in electricity market is proposed in this paper. In this model, bidding decision is formulated as a probabilistic model that takes into account the decision-maker's willingness to bid, risk preferences, the fluctuation of fuel-price, etc. At the same time, generating unit's uncertain output model is considered by its forced outage rate (FOR). Based on the model, the uncertainty of market price is then analyzed. Taking the analytical results into consideration, not only the reliability of the power system can be conventionally analyzed, but also the possible distribution of market prices can be easily obtained. The probability distribution of market prices can be further used to calculate the expected output and the sales income of generating unit in the market. Based on these results, it is also possible to evaluate the risk involved by generating units. A simple system with four generating units is used to illustrate the proposed algorithm. The proposed algorithm and the modeling technique are expected to helpful to the market participants in making their economic decisions

  11. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  12. An assessment of the reliability of the Ontario electricity system : 18-month outlook from April 2004 to September 2005

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents a resource assessment by the Independent Electricity Market Operator (IMO) for the 18-month period from April 2004 to September 2005. It is based on the IMO's forecast of electricity demand. The information was provided by power generators in Ontario. The outlook for the electricity system has improved due to the return to service of 3 nuclear units and the addition of more than 700 MW of generation. The return to service of the nuclear units has decreased Ontario's reliance on imports to help meet energy demand in the province. The shutdown of 1150 MW of coal-fired generation at Lakeview Thermal Generating Station in Mississauga emphasizes the importance of improving transmission and generation capacity in the Toronto area. This report also includes updated values for existing resource scenarios and planned resource scenarios. The reliability of Ontario's transmission system was also assessed along with the adequacy of the existing resource to meet the forecast demand. The existing installed generation resources include 5 nuclear stations generating 10,831 MW of electricity, 5 coal stations generating 7,564 MW of electricity, 22 oil and gas fired stations generating 4,364 MW of electricity, 61 hydroelectric stations generating 7,676 MW of electricity, and 2 other stations generating 66 MW of electricity. Although the existing resource scenario is better than in previous reports, imports will be required under extreme weather conditions to help meet electricity demand in Ontario during peak periods. 21 tabs., 10 figs

  13. Electric Power Monthly, June 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-09-13

    The EPM is prepared by the Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the national, Census division, and State levels for net generation, fuel consumption, fuel stocks, quantity and quality of fuel, electricity sales, and average revenue per kilowatthour of electricity sold. Data on net generation are also displayed at the North American Electric Reliability Council (NERC) region level. Additionally, company and plant level information are published in the EPM on capability of new plants, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fuel. Quantity, quality, and cost of fuel data lag the net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour data by 1 month. This difference in reporting appears in the national, Census division, and State level tables. However, at the plant level, all statistics presented are for the earlier month for the purpose of comparison. 40 tabs.

  14. Reliability of the MODS assay decentralisation process in three health regions in Peru

    Science.gov (United States)

    Mendoza, A.; Castillo, E.; Gamarra, N.; Huamán, T.; Perea, M.; Monroi, Y.; Salazar, R.; Coronel, J.; Acurio, M.; Obregón, G.; Roper, M.; Bonilla, C.; Asencios, L.; Moore, D. A. J.

    2011-01-01

    OBJECTIVE To deliver rapid isoniazid (INH) and rifampicin (RMP) drug susceptibility testing (DST) close to the patient, we designed a decentralisation process for the microscopic observation drug susceptibility (MODS) assay in Peru and evaluated its reliability. METHODS After 2 weeks of training, laboratory staff processed ≥120 consecutive sputum samples each in three regional laboratories. Samples were processed in parallel with MODS testing at an expert laboratory. Blinded paired results were independently analysed by the Instituto Nacional de Salud (INS) according to predetermined criteria: concordance for culture, DST against INH and RMP and diagnosis of multidrug-resistant t uberculosis (MDR-TB) ≥ 95%, McNemar's P > 0.05, kappa index (κ) ≥ 0.75 and contamination 1–4%. Sensitivity and specificity for MDR-TB were calculated. RESULTS The accreditation process for Callao (126 samples, 79.4% smear-positive), Lima Sur (n = 130, 84%) and Arequipa (n = 126, 80%) took respectively 94, 97 and 173 days. Pre-determined criteria in all regional laboratories were above expected values. The sensitivity and specificity for detecting MDR-TB in regional laboratories were >95%, except for sensitivity in Lima Sur, which was 91.7%. Contamination was 1.0–2.3%. Mean delay to positive MODS results was 9.9–12.9 days. CONCLUSION Technology transfer of MODS was reliable, effective and fast, enabling the INS to accredit regional laboratories swiftly. PMID:21219684

  15. Accuracy and reliability of noninvasive stroke volume monitoring via ECG-gated 3D electrical impedance tomography in healthy volunteers

    Science.gov (United States)

    Proença, Martin; Adler, Andy; Riedel, Thomas; Thiran, Jean-Philippe; Solà, Josep

    2018-01-01

    Cardiac output (CO) and stroke volume (SV) are parameters of key clinical interest. Many techniques exist to measure CO and SV, but are either invasive or insufficiently accurate in clinical settings. Electrical impedance tomography (EIT) has been suggested as a noninvasive measure of SV, but inconsistent results have been reported. Our goal is to determine the accuracy and reliability of EIT-based SV measurements, and whether advanced image reconstruction approaches can help to improve the estimates. Data were collected on ten healthy volunteers undergoing postural changes and exercise. To overcome the sensitivity to heart displacement and thorax morphology reported in previous work, we used a 3D EIT configuration with 2 planes of 16 electrodes and subject-specific reconstruction models. Various EIT-derived SV estimates were compared to reference measurements derived from the oxygen uptake. Results revealed a dramatic impact of posture on the EIT images. Therefore, the analysis was restricted to measurements in supine position under controlled conditions (low noise and stable heart and lung regions). In these measurements, amplitudes of impedance changes in the heart and lung regions could successfully be derived from EIT using ECG gating. However, despite a subject-specific calibration the heart-related estimates showed an error of 0.0 ± 15.2 mL for absolute SV estimation. For trending of relative SV changes, a concordance rate of 80.9% and an angular error of −1.0 ± 23.0° were obtained. These performances are insufficient for most clinical uses. Similar conclusions were derived from lung-related estimates. Our findings indicate that the key difficulty in EIT-based SV monitoring is that purely amplitude-based features are strongly influenced by other factors (such as posture, electrode contact impedance and lung or heart conductivity). All the data of the present study are made publicly available for further investigations. PMID:29373611

  16. 75 FR 20832 - National Coal Council

    Science.gov (United States)

    2010-04-21

    ... DEPARTMENT OF ENERGY National Coal Council AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the National Coal Council (NCC). The Federal Advisory... Biomass/Coal Blending to Generate Electricity Council Business: [cir] Finance Report by Committee Chairman...

  17. Council Districts

    Data.gov (United States)

    Town of Cary, North Carolina — View the location of the Town of Cary’s four Town Council districts.Please note that one district, District A, is split into two geo-spatial areas. One area is in...

  18. Exploring the relationship between agricultural electricity consumption and output: New evidence from Turkish regional data

    International Nuclear Information System (INIS)

    Dogan, Eyup; Sebri, Maamar; Turkekul, Berna

    2016-01-01

    This study investigates the relationship between agricultural electricity consumption and agricultural output for a panel of 12 regions of Turkey for the period 1995–2013. In order to reveal the possible heterogeneity between regions, empirical analyses are conducted for the whole panel data and two sub-groups within the panel data; namely, coastal regions and non-coastal regions. The results from several panel unit root tests indicate that electricity consumption and output are stationary process at their levels for overall panel and the two specific groups. By using the OLS with regional fixed effects, this study finds that coefficient estimate of electricity consumption on output is statistically significant and positive for overall regions, coastal regions and non-coastal regions. In addition, the results from the Dumitrescu-Hurlin Granger causality test show that there is unidirectional causality running from agricultural output to electricity consumption for non-coastal regions, and there is bidirectional causality between agricultural electricity consumption and output for overall panel and coastal regions. Findings and policy implications are further discussed. - Highlights: •This study uses the recently developed Dumitrescu-Hurlin Granger causality test. •There is unidirectional causality running from agricultural output to electricity consumption for non-coastal regions. •Bidirectional causality runs between the analyzed variables for coastal regions. •Electricity consumption increases agricultural output.

  19. Monitoring the implementation of the State-Regional Council agreement 03/02/2005 as to the management of acute stroke events: a comparison of the Italian regional legislations.

    Science.gov (United States)

    Guidetti, Donata; Spallazzi, Marco; Rota, Eugenia; Morelli, Nicola; Immovilli, Paolo; Toni, Danilo; Baldereschi, Marzia; Di Carlo, Antonio; Polizzi, Bianca M; Ferro, Salvatore; Inzitari, Domenico

    2013-09-01

    Access to effective acute stroke services is a crucial factor to reduce stroke-related death and disability, but is limited in different parts of Italy. Our study addresses this inequality across the Italian regions by examining the regional legislations issued to adopt and implement the State-Regional Council agreement 03/02/2005 as to the acute stroke management. All decrees and resolutions as to acute stroke were collected from each region and examined by the means of a check list including quantitative and qualitative characteristics, selected in accordance with the recommendations from the State-Regional Council document. Each completed check list was then sent to each regional reference person, who filled in the section on the implementation of the indications and compliance, with the collaboration of stroke specialists if necessary. The study was carried out from November 2009 to September 2010. The documents and information were collected from 19 regions. Our survey revealed disparities both in terms of number of decrees and resolutions and of topics covered by the regional legislations about stroke care. Most legislations lacked practical and economical details. This feedback from national and regional stroke regulations revealed a need of more concrete indications. Involvement of various stakeholders (legislators, consumers, providers) might possibly ensure that policies are actually adopted, implemented and maintained. Although considerable challenges are present to the development of standard and optimal stroke care more widely across Italian regions, the potential gains from such developments are substantial.

  20. HEMP emergency planning and operating procedures for electric power systems

    Energy Technology Data Exchange (ETDEWEB)

    Reddoch, T.W.; Markel, L.C. (Electrotek Concepts, Inc., Knoxville, TN (United States))

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  1. Influence of moisture and hydrogen purity of the reliability of powerful electric machines

    International Nuclear Information System (INIS)

    Vigovs'kij, O.V.; Khvalyin, D.Yi.; Mistets'kij, V.A.

    2017-01-01

    It is shown that today the turbo generators with hydrogen-water cooling system is most unreliable technical equipment of Ukrainian nuclear power plants. On the one hand, hydrogen has several advantages over other coolers; on the other hand, the presence of hydrogen in the turbo generators systems carries the danger of engine rooms of power plants. It is also shown that the water and oxygen are main hazardous impurities in hydrogen, and zone of generator shaft compaction is the most responsible zone with high concentration of water. From the analysis was found that increasing of hydrogen purity reduces the mechanical losses and the change in total losses depending on the hydrogen purity has a linear nature. For example, with an increase the hydrogen purity from 0,1203 to 0,09 the loss in turbo generator rotor can be reduced by nearly 500 kW, which is about 25 % at a pressure of 0,5 MPa. The possibility of using metal hydrides to ensure purity, purification and hydrogen sorption was looked. The most practical value is for such hydrides as LaNi5Hx, FeTiHx, ZrNiHx. The main advantage the metal hydrides method of purification is a significant reduction in the number of purification stages. It was shown that the use of a thermoelectric gas dryer will reduce the total consumption of technological gases, that are removed from nuclear power plants, by 2,3 - 2,4 times due to a decrease in 5,0 - 6,0 times their absolute humidity, and decrease by 5, 0 times the activity of gases due to an increase in their exposure time in the decrease activity installation. All this suggests that the creation a hydrogen humidity monitoring system in the exploited turbo generator will solve the problem of objective control of hydrogen purity with further computerization and accumulation the information. Using a drainage or purification system of hydrogen, reducing the temperature and humidity of the cooling gas, can increase the reliability of operation the turbo generators and significantly

  2. National and regional economic impacts of electricity production from energy crops in the Netherlands

    NARCIS (Netherlands)

    Vlasblom, J.; Broek, R. van den; Meeusen-van Onna, M.

    1998-01-01

    Besides the known environmental benefits, national and regional economic impacts may form additional arguments for stimulating government measures in favour of electricity production from energy crops in the Netherlands. Therefore, we compared the economic impacts (at both national and regional

  3. 78 FR 43198 - Flexible and Local Resources Needed for Reliability in the California Wholesale Electric Market...

    Science.gov (United States)

    2013-07-19

    ... auction impact the effectiveness of forward procurement for reliability purposes? Why or why not? 11:15 a... three-year forward resource adequacy obligation backed by a market-based CAISO backstop procurement... development of a durable, market-based mechanism to provide incentives to insure reliability needs are met...

  4. Economic Evaluation of the Information Security Levels Achieved by Electric Energy Providers in North Arctic Region

    Science.gov (United States)

    Sushko, O. P.; Kaznin, A. A.; Babkin, A. V.; Bogdanov, D. A.

    2017-10-01

    The study we are conducting involves the analysis of information security levels achieved by energy providers operating in the North Arctic Region. We look into whether the energy providers’ current information security levels meet reliability standards and determine what further actions may be needed for upgrading information security in the context of the digital transformation that the world community is undergoing. When developing the information security systems for electric energy providers or selecting the protection means for them, we are governed by the fact that the assets to be protected are process technologies. While information security risk can be assessed using different methods, the evaluation of the economic damage from these risks appears to be a difficult task. The most probable and harmful risks we have identified when evaluating the electric energy providers’ information security will be used by us as variables. To provide the evaluation, it is necessary to calculate the costs relating to elimination of the risks identified. The final stage of the study will involve the development of an operation algorithm for the North Arctic Region’s energy provider’s business information protection security system - a set of information security services, and security software and hardware.

  5. Electrifying integration Electricity production and the South East Europe regional energy market

    International Nuclear Information System (INIS)

    Hooper, Elizabeth; Medvedev, Andrei

    2009-01-01

    The paper provides an overview of the generation of electricity in 10 countries in South East Europe during 1995-2004. Using the latest available statistics, we explore the potential of the nascent integration of the electricity markets in South East Europe. We conduct a cross-country analysis of electricity production based on different types of fuel used. The region has a low level of gasification combined with few nuclear power generation facilities, while some countries heavily rely on hydro electric generation. Differences in countries' resource endowment and the possibility of intertemporal substitution between electricity generated from various fuels could stimulate a regional trade in electricity. As an alternative to nationally independent energy policy, regional trade could displace a proportion of the substantial investment in generation facilities required to avert serious supply shortages. Finally, we consider the environmental impact of electricity generation, and identify some of the key trade-offs between different policy objectives. (author)

  6. Strategic bidding of generating units in competitive electricity market with considering their reliability

    International Nuclear Information System (INIS)

    Soleymani, S.; Ranjbar, A.M.; Shirani, A.R.

    2008-01-01

    In the restructured power systems, they are typically scheduled based on the offers and bids to buy and sell energy and ancillary services (AS) subject to operational and security constraints. Generally, no account is taken of unit reliability when scheduling it. Therefore generating units have no incentive to improve their reliability. This paper proposes a new method to obtain the equilibrium points for reliability and price bidding strategy of units when the unit reliability is considered in the scheduling problem. The proposed methodology employs the supply function equilibrium (SFE) for modeling a unit's bidding strategy. Units change their bidding strategies and improve their reliability until Nash equilibrium points are obtained. GAMS (general algebraic modeling system) language has been used to solve the market scheduling problem using DICOPT optimization software with mixed integer non-linear programming. (author)

  7. ANALYSIS OF GROSS REGIONAL PRODUCT FLUCTUATIONS AND ELECTRIC POWER CONSUMPTION IN 2005- 2014. RESERVES FOR DECREASING ELECTRIC POWER PRICES

    Directory of Open Access Journals (Sweden)

    Suslov N. I.

    2016-09-01

    Full Text Available In this work we considered the trajectories of change in indicators characterizing the status of economics and power industry: gross regional product, electric power consumption, industrial production, energy prices and costs of delivering electric power to consumers in Russian regions for the last 10 years. Low global commodity prices and sanctions led to a sharp decrease of equipment import, which resulted in an acute problem of import substitution. The level of tariffs of natural monopolies is of great importance for industrial development. The goal of this work was to analyze possibilities for reducing electric power prices by changing the institutional and economic conditions of management. We analyzed not only the official information from Rosstat, but also government regulations, figures given in the official government publication «The Rossiyskaya Gazeta» as well as articles and interviews on economic problems of the electric power industry over the recent years published in «The Kommersant» newspaper. High tariffs of network marketing companies for electric energy transmission, state regulation of heating prices, financing the construction of new capacities by charging the payment in power provision contracts, high price of electric power of nuclear power plants lead to an annual increase in electric power prices for end users. In this work we considered possible solutions to limit the growth of electric power prices.

  8. reliability reliability

    African Journals Online (AJOL)

    eobe

    Corresponding author, Tel: +234-703. RELIABILITY .... V , , given by the code of practice. However, checks must .... an optimization procedure over the failure domain F corresponding .... of Concrete Members based on Utility Theory,. Technical ...

  9. Electric power monthly with data for October 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    This publication provides monthly statistics at the State, Census division, and U.S. levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council regions. Statistics are published on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. A monthly utility update and summary of industry developments are also included. 63 tabs., 1 fig.

  10. Electric power monthly with data for August 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    This publication provides monthly statistics at the state, census division, and U.S. levels for net generation; fossil fuel consumption and stocks, quantity, and quality of fossil fuels; cost of fossil fuels; electricity retail sales; associated revenue; and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council regions. Statistics on net generation are published by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. The monthly update is summarized, and industry developments are briefly described. 1 fig., 63 tabs.

  11. Preparing tomorrow's grid: RTE at the service of regions to support energy transition. Regional electric assessments - Stakes and key data

    International Nuclear Information System (INIS)

    2014-06-01

    This document gathers a first one which presents the regional electric assessments and 21 regional reports. The presentation document briefly outlines the interdependency of regions, the diversity of regional situation in terms of electricity production and consumption, needs and ways to develop energy saving in order to reduce sensitivity to temperature, the evolution, objectives and contrasted results of the development of renewable energies, the investments and projects by RTE to develop and improve the grid. Regional reports propose maps and graphs and a synthesis of the evolution of electricity consumption, of the evolution of electricity consumption by industries, of the evolution of peak consumptions, of the evolution of consumption coverage by regional production, of the origin of electricity production (renewable thermal, photovoltaic, thermal fossil, hydraulic, nuclear), of the evolution of the various productions (renewable, hydraulic, thermal fossil, nuclear), of the evolution of the share of renewable energies, of the development of photovoltaic and wind installed power. They also present projects and investments, and propose maps of France indicating the level of consumption, the evolution of consumption between 2006 and 2013, the production/consumption rate of the different French regions and the energy exchanges between regions

  12. New information technologies in operative control of modes in regional electrical power systems

    OpenAIRE

    ANDREY D. TEVJASHEV; TATJANA B. TIMOFEEVA

    2003-01-01

    The problem of development of software for management of modes in electrical power systems in connection with casual character of a load in network is considered. The stochastic mathematical model of a system for operating control of modes in regional electrical power systems is offered. The methods for problem solving of operating control and operating planning of operational modes in regional electrical power systems are developed. The application of the developed models and methods will al...

  13. Two-stage stochastic programming model for the regional-scale electricity planning under demand uncertainty

    International Nuclear Information System (INIS)

    Huang, Yun-Hsun; Wu, Jung-Hua; Hsu, Yu-Ju

    2016-01-01

    Traditional electricity supply planning models regard the electricity demand as a deterministic parameter and require the total power output to satisfy the aggregate electricity demand. But in today's world, the electric system planners are facing tremendously complex environments full of uncertainties, where electricity demand is a key source of uncertainty. In addition, electricity demand patterns are considerably different for different regions. This paper developed a multi-region optimization model based on two-stage stochastic programming framework to incorporate the demand uncertainty. Furthermore, the decision tree method and Monte Carlo simulation approach are integrated into the model to simplify electricity demands in the form of nodes and determine the values and probabilities. The proposed model was successfully applied to a real case study (i.e. Taiwan's electricity sector) to show its applicability. Detail simulation results were presented and compared with those generated by a deterministic model. Finally, the long-term electricity development roadmap at a regional level could be provided on the basis of our simulation results. - Highlights: • A multi-region, two-stage stochastic programming model has been developed. • The decision tree and Monte Carlo simulation are integrated into the framework. • Taiwan's electricity sector is used to illustrate the applicability of the model. • The results under deterministic and stochastic cases are shown for comparison. • Optimal portfolios of regional generation technologies can be identified.

  14. Electric power monthly, July 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data in this report are presented for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The EIA collected the information in this report to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The EPM is prepared by the Survey Management Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy. This publication provides monthly statistics at the US, Census division, and State levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. Statistics by company and plant are published in the EPM on the capability of new generating units, net generation, fuel consumption, fuel stocks, quantity and quality of fuel, and cost of fossil fuels. Data on quantity, quality, and cost of fossil fuels lag data on net generation, fuel consumption, fuel stocks, electricity sales, and average revenue per kilowatthour by 1 month. This difference in reporting appears in the US, Census division, and State level tables. However, for purposes of comparison, plant-level data are presented for the earlier month.

  15. 77 FR 41184 - Coordination Between Natural Gas and Electricity Markets; Notice of Technical Conferences

    Science.gov (United States)

    2012-07-12

    ... Operator Inc. (MISO), Southwest Power Pool, Inc. (SPP) and Electric Reliability Council of Texas (ERCOT). While we recognize we do not have Federal Power Act jurisdiction over the rates or terms of service in...-electric interdependence. The commenters raised a wide variety of issues regarding gas-electric...

  16. Coordinated emergency response in a competitive electricity market

    Energy Technology Data Exchange (ETDEWEB)

    Brindley, S. [Independent Electricity Market Operator, Toronto, ON (Canada)

    2002-07-01

    The Ontario Electricity Act and the Market Rules oblige electricity market participants to prepare and submit emergency plans to ensure the safe and reliable operation of the power system. Security and emergency preparedness includes emergency planning, drills and exercises, and critical infrastructure protection. The risk of power disruption is credible and the impact is large, as witnessed by the 1998 ice storm in eastern Ontario which resulted in major power outages, and as witnessed by the events of September 11, 2001. The emergency control actions that manage power system contingencies include recalling planned outages, reducing interchanges, increasing reserves, reducing voltage, purchasing emergency energy, and load shedding. Restoration priorities are to first restore power to critical transmission and generating station service loads, then to restore critical telecom facilities. This is followed by the restoration of customer loads only to the extent needed to control voltage and secure generating units. The final priority is to interconnect neighbours. The North American Electric Reliability Council (NERC) was established following the major 1965 blackout. NERC developed operational reliability standards and monitored compliance. A map depicting NERC regions and control areas in the US was presented. In Canada, the Canadian Electricity Association (CEA) addresses issues regarding critical infrastructure protection (CIP). It safeguards the essential components of the electricity infrastructure against physical and cyber threats through early warning systems and information sharing. 9 figs.

  17. Electric power monthly, October 1998, with data for July 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 57 tabs.

  18. Electric power monthly, November 1998, with data for August 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 57 tabs.

  19. Electric power monthly, September 1998, with data for June 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  20. Electric power monthly, June 1999, with data for March 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 57 tabs.

  1. Electric power monthly, April 1999 with data for January 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Electric Power Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  2. Electric power monthly: October 1995, with data for July 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-19

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. The Coal and Electric Data and Renewables Division; Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), Department of Energy prepares the EPM. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity sales, revenue, and average revenue per kilowatthour of electricity sold. Data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant.

  3. Automated bony region identification using artificial neural networks: reliability and validation measurements

    Energy Technology Data Exchange (ETDEWEB)

    Gassman, Esther E.; Kallemeyn, Nicole A.; DeVries, Nicole A.; Shivanna, Kiran H. [The University of Iowa, Department of Biomedical Engineering, Seamans Center for the Engineering Arts and Sciences, Iowa City, IA (United States); The University of Iowa, Center for Computer-Aided Design, Iowa City, IA (United States); Powell, Stephanie M. [The University of Iowa, Department of Biomedical Engineering, Seamans Center for the Engineering Arts and Sciences, Iowa City, IA (United States); University of Iowa Hospitals and Clinics, The University of Iowa, Department of Radiology, Iowa City, IA (United States); Magnotta, Vincent A. [The University of Iowa, Department of Biomedical Engineering, Seamans Center for the Engineering Arts and Sciences, Iowa City, IA (United States); The University of Iowa, Center for Computer-Aided Design, Iowa City, IA (United States); University of Iowa Hospitals and Clinics, The University of Iowa, Department of Radiology, Iowa City, IA (United States); Ramme, Austin J. [University of Iowa Hospitals and Clinics, The University of Iowa, Department of Radiology, Iowa City, IA (United States); Adams, Brian D. [The University of Iowa, Department of Biomedical Engineering, Seamans Center for the Engineering Arts and Sciences, Iowa City, IA (United States); University of Iowa Hospitals and Clinics, The University of Iowa, Department of Orthopaedics and Rehabilitation, Iowa City, IA (United States); Grosland, Nicole M. [The University of Iowa, Department of Biomedical Engineering, Seamans Center for the Engineering Arts and Sciences, Iowa City, IA (United States); University of Iowa Hospitals and Clinics, The University of Iowa, Department of Orthopaedics and Rehabilitation, Iowa City, IA (United States); The University of Iowa, Center for Computer-Aided Design, Iowa City, IA (United States)

    2008-04-15

    The objective was to develop tools for automating the identification of bony structures, to assess the reliability of this technique against manual raters, and to validate the resulting regions of interest against physical surface scans obtained from the same specimen. Artificial intelligence-based algorithms have been used for image segmentation, specifically artificial neural networks (ANNs). For this study, an ANN was created and trained to identify the phalanges of the human hand. The relative overlap between the ANN and a manual tracer was 0.87, 0.82, and 0.76, for the proximal, middle, and distal index phalanx bones respectively. Compared with the physical surface scans, the ANN-generated surface representations differed on average by 0.35 mm, 0.29 mm, and 0.40 mm for the proximal, middle, and distal phalanges respectively. Furthermore, the ANN proved to segment the structures in less than one-tenth of the time required by a manual rater. The ANN has proven to be a reliable and valid means of segmenting the phalanx bones from CT images. Employing automated methods such as the ANN for segmentation, eliminates the likelihood of rater drift and inter-rater variability. Automated methods also decrease the amount of time and manual effort required to extract the data of interest, thereby making the feasibility of patient-specific modeling a reality. (orig.)

  4. Automated bony region identification using artificial neural networks: reliability and validation measurements

    International Nuclear Information System (INIS)

    Gassman, Esther E.; Kallemeyn, Nicole A.; DeVries, Nicole A.; Shivanna, Kiran H.; Powell, Stephanie M.; Magnotta, Vincent A.; Ramme, Austin J.; Adams, Brian D.; Grosland, Nicole M.

    2008-01-01

    The objective was to develop tools for automating the identification of bony structures, to assess the reliability of this technique against manual raters, and to validate the resulting regions of interest against physical surface scans obtained from the same specimen. Artificial intelligence-based algorithms have been used for image segmentation, specifically artificial neural networks (ANNs). For this study, an ANN was created and trained to identify the phalanges of the human hand. The relative overlap between the ANN and a manual tracer was 0.87, 0.82, and 0.76, for the proximal, middle, and distal index phalanx bones respectively. Compared with the physical surface scans, the ANN-generated surface representations differed on average by 0.35 mm, 0.29 mm, and 0.40 mm for the proximal, middle, and distal phalanges respectively. Furthermore, the ANN proved to segment the structures in less than one-tenth of the time required by a manual rater. The ANN has proven to be a reliable and valid means of segmenting the phalanx bones from CT images. Employing automated methods such as the ANN for segmentation, eliminates the likelihood of rater drift and inter-rater variability. Automated methods also decrease the amount of time and manual effort required to extract the data of interest, thereby making the feasibility of patient-specific modeling a reality. (orig.)

  5. Nuclear power plants electrical retrofitting for cost effectiveness, reliability and operating efficiency

    International Nuclear Information System (INIS)

    Ciufu, L.; Popescu, M. O.

    2016-01-01

    In the context of continuous fast growing of the energy demand the current power plants retrofitting concept may represent an important step in the emission reduction, being able to offer in the same time a maximum operating efficiency. This desideratum can be obtained by implementing a rigorous energy management plan, based on an increased energy production capacity of non-pollutant electrical power plants and future-oriented frame on extending their lifetime operation. This management is focused on using state-of-art electronic, electrical and industrial control equipments, which can represent a real key factor. Thus, in this paper an analysis of the electrical system retrofitting is presented. As a part of this research the authors propose and simulate ambitious ways to upgrade actual control and command of the electrical operating systems, by promoting variable speed for large pumps and also computer software, as SCADA, for an intelligent control and monitoring of these studied processes. (authors)

  6. The safety and reliability of the electricity transportation network, and the opening of markets

    International Nuclear Information System (INIS)

    Merlin, A.

    2003-01-01

    Following a decade in which the electricity sector was concerned by the opening of markets the world over, the year 2003 highlighted the challenges of secure supply and of the safety of electrical systems. Major incidents are nothing new throughout history, and occurred well before the trend towards opening the markets dot underway. However, it is necessary to verify that the rules for the organisation, clarification of responsibilities and regulation make it possible to control the growing complexity of interconnected systems related to opening the market up to competition. Faced with such situations, changes are necessary in Europe. Firstly, it is important to have the second European directive on the internal electricity market introduced everywhere, this directive providing common rules to be met by all key players to ensure greater safety within the electricity system, and strengthening the role of the electricity transport network manager, who is separate from the other players in the market. It is also necessary to draft a third directive, focusing on both security of supply and the operational safety of the European electricity system. (authors)

  7. Regional inversion of CO2 ecosystem fluxes from atmospheric measurements. Reliability of the uncertainty estimates

    Energy Technology Data Exchange (ETDEWEB)

    Broquet, G.; Chevallier, F.; Breon, F.M.; Yver, C.; Ciais, P.; Ramonet, M.; Schmidt, M. [Laboratoire des Sciences du Climat et de l' Environnement, CEA-CNRS-UVSQ, UMR8212, IPSL, Gif-sur-Yvette (France); Alemanno, M. [Servizio Meteorologico dell' Aeronautica Militare Italiana, Centro Aeronautica Militare di Montagna, Monte Cimone/Sestola (Italy); Apadula, F. [Research on Energy Systems, RSE, Environment and Sustainable Development Department, Milano (Italy); Hammer, S. [Universitaet Heidelberg, Institut fuer Umweltphysik, Heidelberg (Germany); Haszpra, L. [Hungarian Meteorological Service, Budapest (Hungary); Meinhardt, F. [Federal Environmental Agency, Kirchzarten (Germany); Necki, J. [AGH University of Science and Technology, Krakow (Poland); Piacentino, S. [ENEA, Laboratory for Earth Observations and Analyses, Palermo (Italy); Thompson, R.L. [Max Planck Institute for Biogeochemistry, Jena (Germany); Vermeulen, A.T. [Energy research Centre of the Netherlands ECN, EEE-EA, Petten (Netherlands)

    2013-07-01

    The Bayesian framework of CO2 flux inversions permits estimates of the retrieved flux uncertainties. Here, the reliability of these theoretical estimates is studied through a comparison against the misfits between the inverted fluxes and independent measurements of the CO2 Net Ecosystem Exchange (NEE) made by the eddy covariance technique at local (few hectares) scale. Regional inversions at 0.5{sup 0} resolution are applied for the western European domain where {approx}50 eddy covariance sites are operated. These inversions are conducted for the period 2002-2007. They use a mesoscale atmospheric transport model, a prior estimate of the NEE from a terrestrial ecosystem model and rely on the variational assimilation of in situ continuous measurements of CO2 atmospheric mole fractions. Averaged over monthly periods and over the whole domain, the misfits are in good agreement with the theoretical uncertainties for prior and inverted NEE, and pass the chi-square test for the variance at the 30% and 5% significance levels respectively, despite the scale mismatch and the independence between the prior (respectively inverted) NEE and the flux measurements. The theoretical uncertainty reduction for the monthly NEE at the measurement sites is 53% while the inversion decreases the standard deviation of the misfits by 38 %. These results build confidence in the NEE estimates at the European/monthly scales and in their theoretical uncertainty from the regional inverse modelling system. However, the uncertainties at the monthly (respectively annual) scale remain larger than the amplitude of the inter-annual variability of monthly (respectively annual) fluxes, so that this study does not engender confidence in the inter-annual variations. The uncertainties at the monthly scale are significantly smaller than the seasonal variations. The seasonal cycle of the inverted fluxes is thus reliable. In particular, the CO2 sink period over the European continent likely ends later than

  8. Council Session

    CERN Multimedia

    CERN PhotoLab

    1977-01-01

    From face, 1st raw: Erich Lohrmann, Sergio Fubini, Léon Van Hove, John Adams (Directors-General), Paul Levaux (President of the Council) Hans-Otto Wüster, Franco Bonaudi, Robert Lévy-Mandel and 2nd raw, centre: Patrick Mollet, Eliane de Modzelewska, Jean-Marie Dufour

  9. Improving health in the Arctic region through safe and affordable access to household running water and sewer services: an Arctic Council initiative.

    Science.gov (United States)

    Hennessy, Thomas W; Bressler, Jonathan M

    2016-01-01

    Important health disparities have been documented among the peoples of the Arctic and subarctic, including those related to limited access to in-home improved drinking water and sanitation services. Although improving water, sanitation and hygiene (WASH) has been a focus of the United Nations for decades, the Arctic region has received little attention in this regard. A growing body of evidence highlights inequalities across the region for the availability of in-home drinking WASH services and for health indicators associated with these services. In this review, we highlight relevant data and describe an initiative through the Arctic Council's Sustainable Development Working Group to characterize the extent of WASH services in Arctic nations, the related health indicators and climate-related vulnerabilities to WASH services. With this as a baseline, efforts to build collaborations across the Arctic will be undertaken to promote innovations that can extend the benefits of water and sanitation services to all residents.

  10. EPRI (Electric Power Research Institute) operator reliability experiments program - Training implications

    International Nuclear Information System (INIS)

    Joksimovich, V.; Spurgin, A.J.; Orvis, D.D.; Moieni, P.; Worledge, D.H.

    1990-01-01

    The primary purpose of the EPRI Operator Reliability Experiments (ORE) Program is to collect data for use in reliability and safety studies of nuclear power plant operation to more realistically take credit for operator performance in preventing core damage. The two objectives for fulfilling this purpose are: (1) to obtain quantitative/qualitative performance data on operating crew responses in the control room for potential accident sequences by using plant simulators, and (2) to test the Human Cognitive Reliability (HCR) correlation. This paper briefly discusses the background to this program, data collection and analysis, the results and quantitative/qualitative insights stemming from phase one which might be of interest to simulator operators and trainers

  11. Regional Transmission Projects: Finding Solutions

    Energy Technology Data Exchange (ETDEWEB)

    The Keystone Center

    2005-06-15

    The Keystone Center convened and facilitated a year-long Dialogue on "Regional Transmission Projects: Finding Solutions" to develop recommendations that will help address the difficult and contentious issues related to expansions of regional electric transmission systems that are needed for reliable and economic transmission of power within and across regions. This effort brought together a cross-section of affected stakeholders and thought leaders to address the problem with the collective wisdom of their experience and interests. Transmission owners sat at the table with consumer advocates and environmental organizations. Representatives from regional transmission organizations exchanged ideas with state and federal regulators. Generation developers explored common interests with public power suppliers. Together, the Dialogue participants developed consensus solutions about how to begin unraveling some of the more intractable issues surrounding identification of need, allocation of costs, and reaching consensus on siting issues that can frustrate the development of regional transmission infrastructure. The recommendations fall into three broad categories: 1. Recommendations on appropriate institutional arrangements and processes for achieving regional consensus on the need for new or expanded transmission infrastructure 2. Recommendations on the process for siting of transmission lines 3. Recommendations on the tools needed to support regional planning, cost allocation, and siting efforts. List of Dialogue participants: List of Dialogue Participants: American Electric Power American Transmission Company American Wind Energy Association California ISO Calpine Corporation Cinergy Edison Electric Institute Environmental Defense Federal Energy Regulatory Commission Great River Energy International Transmission Company ISO-New England Iowa Public Utility Board Kanner & Associates Midwest ISO National Association of Regulatory Utility Commissioners National Association

  12. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    Science.gov (United States)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  13. ELECTRIC PROBE INVESTIGATION OF ARC ANODE REGION IN PLASMA TORCH

    Czech Academy of Sciences Publication Activity Database

    Chumak, Oleksiy; Hrabovský, Milan; Kavka, Tetyana

    2006-01-01

    Roč. 10, č. 4 (2006), s. 515-524 ISSN 1093-3611. [High technology plasma processes. Saint-Petersburg, 27.5.2006-4.6.2006] R&D Projects: GA ČR GA202/05/0669 Institutional research plan: CEZ:AV0Z20430508 Keywords : plasma torch * arc * anode attachment * restrike * electric probes Subject RIV: BL - Plasma and Gas Discharge Physics Impact factor: 0.343, year: 2006

  14. Accelerated reliability testing of highly aligned single-walled carbon nanotube networks subjected to DC electrical stressing.

    Science.gov (United States)

    Strus, Mark C; Chiaramonti, Ann N; Kim, Young Lae; Jung, Yung Joon; Keller, Robert R

    2011-07-01

    We investigate the electrical reliability of nanoscale lines of highly aligned, networked, metallic/semiconducting single-walled carbon nanotubes (SWCNTs) fabricated through a template-based fluidic assembly process. We find that these SWCNT networks can withstand DC current densities larger than 10 MA cm(-2) for several hours and, in some cases, several days. We develop test methods that show that the degradation rate, failure predictability and total device lifetime can be linked to the initial resistance. Scanning electron and transmission electron microscopy suggest that fabrication variability plays a critical role in the rate of degradation, and we offer an empirical method of quickly determining the long-term performance of a network. We find that well-fabricated lines subject to constant electrical stress show a linear accumulation of damage reminiscent of electromigration in metallic interconnects, and we explore the underlying physical mechanisms that could cause such behavior.

  15. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  16. Reliability through markets in Ontario : submission by the Independent Electricity Market Operator to the Minister of Energy's Consultation Process

    International Nuclear Information System (INIS)

    2003-01-01

    For the past five years, Ontario has invested $1 billion to restructure and open its electricity market to competition. In recent months, and in response to residential consumers pricing concerns, the Independent Electricity Market Operator (IMO) transferred credits to local distribution companies allowing them to issue $75 rebates to all affected customers as of December 1, 2002, and to bill low-volume and other designated customers at a rate of 4.3 cents per kilowatt hour for the commodity portion of their bills. This report addresses the concern that price responsiveness will be lost for those parts of the market with fixed prices. It was noted that the reliability of the power system could be placed at risk if the range of customers with fixed prices is broadened. Fixed prices would also jeopardize the province's ability to attract new supply and enhance competition in the electricity sector. The IMO believes that price responsiveness in the wholesale market is crucial to the reliability of the electricity system and recommends that a plan for any additional fixed pricing should include a clearly defined phase-out over the period ending in 2006 as new supply comes on-line. The IMO emphasizes that the lack of price responsiveness to the market, particularly in peak energy demand periods, is equivalent to adding hundreds of MW to the load. The report presents lessons learned in other jurisdictions and highlights noteworthy considerations such as the market power mitigation agreement, improving competition, a phased-in approach, and demand side initiatives

  17. Navigating financial and supply reliability tradeoffs in regional drought management portfolios

    Science.gov (United States)

    Zeff, Harrison B.; Kasprzyk, Joseph R.; Herman, Jonathan D.; Reed, Patrick M.; Characklis, Gregory W.

    2014-06-01

    Rising development costs and growing concerns over environmental impacts have led many communities to explore more diversified water management strategies. These "portfolio"-style approaches integrate existing supply infrastructure with other options such as conservation measures or water transfers. Diversified water supply portfolios have been shown to reduce the capacity and costs required to meet demand, while also providing greater adaptability to changing hydrologic conditions. However, this additional flexibility can also cause unexpected reductions in revenue (from conservation) or increased costs (from transfers). The resulting financial instability can act as a substantial disincentive to utilities seeking to implement more innovative water management techniques. This study seeks to design portfolios that employ financial tools (e.g., contingency funds and index insurance) to reduce fluctuations in revenues and costs, allowing these strategies to achieve improved performance without sacrificing financial stability. This analysis is applied to the development of coordinated regional supply portfolios in the "Research Triangle" region of North Carolina, an area comprising four rapidly growing municipalities. The actions of each independent utility become interconnected when shared infrastructure is utilized to enable interutility transfers, requiring the evaluation of regional tradeoffs in up to five performance and financial objectives. Diversified strategies introduce significant tradeoffs between achieving reliability goals and introducing burdensome variability in annual revenues and/or costs. Financial mitigation tools can mitigate the impacts of this variability, allowing for an alternative suite of improved solutions. This analysis provides a general template for utilities seeking to navigate the tradeoffs associated with more flexible, portfolio-style management approaches.

  18. Transmission Planning Process and Opportunities for Utility-Scale Solar Engagement within the Western Electricity Coordinating Council (WECC)

    Energy Technology Data Exchange (ETDEWEB)

    Hein, J.; Hurlbut, D.; Milligan, M.; Coles, L.; Green, B.

    2011-11-01

    This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. Market barriers unrelated to technology often limit the expansion of utility-scale solar power, even in areas with exceptional resource potential. Many of these non-technical barriers have to do with policy, regulation, and planning, and hardly ever do they resolve themselves in a timely fashion. In most cases, pre-emptive intervention by interested stakeholders is the easiest way to remove/address such barriers, but it requires knowing how to navigate the institutional waters of the relevant agencies and boards. This report is a primer for solar developers who wish to engage directly in expediting the regulatory process and removing market barriers related to policy and planning. It focuses on the Western Interconnection (WI), primarily because the quality of solar resources in the Southwest makes utility-scale concentrating solar power (CSP) and photovoltaics (PV) economically feasible, and because the relevant institutions have evolved in a way that has opened up opportunities for removing non-technical market barriers. Developers will find in this report a high-level field manual to identify the venues for mitigating and possibly eliminating systemic market obstacles and ensuring that the economic playing field is reasonably level. Project-specific issues such as siting for transmission and generation resources are beyond the scope of this report. Instead, the aim is to examine issues that pervasively affect all utility-scale PV and CSP in the region regardless of where the project may be. While the focus is on the WI, many of the institutions described here also have their counterparts in the Eastern and the Texas interconnections. Specifically, this report suggests a number of critical engagement points relating to generation and transmission planning.

  19. Northeast regional assessment study for solar electric options in the period 1980-2000

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-04-01

    Opportunities for demonstration and large scale deployment of solar electric facilities are identified and assessed. Technical, economic, and institutional factors that can contribute to an accelerated use of solar energy for electric power generation are defined. The following topics are covered: a description of the Northeast Region and its solar resources, central station applications, a dispersed user analysis, user viewpoints and institutional factors, and market potential for dispersed solar electric systems. (MHR)

  20. Council dinner

    CERN Multimedia

    1980-01-01

    Jean Teillac (President of the Council) gives the speech. The occasion was the end-of-term of Leon Van Hove and John Adams as Research and Executive Director-General, respectively, to be succeeded by Herwig Schopper. The venue was the Hotel Beau-Rivage in Geneva. Beside Jean Teillac are (on the left) G.H. Stafford and Mme Van Hove, (on the right) Mme Schopper.

  1. Modeling a clean energy standard for electricity: Policy design implications for emissions, supply, prices, and regions

    International Nuclear Information System (INIS)

    Paul, Anthony; Palmer, Karen; Woerman, Matt

    2013-01-01

    The electricity sector is responsible for roughly 40% of U.S. carbon dioxide (CO 2 ) emissions, and a reduction in CO 2 emissions from electricity generation is an important component of the U.S. strategy to reduce greenhouse gas emissions. Toward that goal, several proposals for a clean energy standard (CES) have been put forth, including one espoused by the Obama administration that calls for 80% clean electricity by 2035 phased in from current levels of roughly 40%. This paper looks at the effects of such a policy on CO 2 emissions from the electricity sector, the mix of technologies used to supply electricity, electricity prices, and regional flows of clean energy credits. The CES leads to a 30% reduction in cumulative CO 2 emissions between 2013 and 2035 and results in dramatic reductions in generation from conventional coal. The policy also results in fairly modest increases on national electricity prices, but this masks a wide variety of effects across regions. - Highlights: ► We model a clean energy standard (CES) for electricity at 80% by 2035. ► We analyze effects on CO 2 emissions, investment, prices, and credit trading. ► 80% CES leads to 30% reduction in cumulative CO 2 emissions by 2035. ► Modest national average electricity price increase masks regional heterogeneity

  2. Preparing for climate change regulation : an assessment of the current state of date reliability in the Canadian electrical industry

    International Nuclear Information System (INIS)

    Schuh, C.

    2003-01-01

    This presentation provided an overview of current Canadian greenhouse gas (GHG) reporting requirements, predictions about GHG regulations, and the current state of GHGs data reliability in the Canadian electrical industry. The author argued that while potential management strategies are necessary, they are not sufficient to meet Kyoto or similar types of initiatives because they do not provide incentives for reductions, they do not establish accountability, nor do they encourage reliable data. It was predicted that the first climate change regulation will be a sectoral agreement enacted at the federal/provincial level. It was also predicted that future regulations will include a requirement to report GHG emissions in a reliable manner and that regulators will use the data to track performance. The final prediction was that the onus will be on the companies to prove that the data is reliable as regulators will have limited resources to check the data. It was noted that the current state of data is not suitable for analytical testing because of a lack of clear definitions, a lack of industry comparison, inability to compare between companies, inability to compare between different types of power generation, and the inability to compare between years. It was suggested that data reliability could be improved by having the regulators review and monitor the reported data, or by having a third party review and provide assurance on the reported data. It was concluded that there will have to be agreement at the industry level on common measurement and calculation methodology, as well as an agreement on a common scope of reporting. 4 figs

  3. Assessing the performance of a cold region evapotranspiration landfill cover using lysimetry and electrical resistivity tomography.

    Science.gov (United States)

    Schnabel, William E; Munk, Jens; Abichou, Tarek; Barnes, David; Lee, William; Pape, Barbara

    2012-01-01

    In order to test the efficacy ofa cold-region evapotranspiration (ET) landfill cover against a conventional compacted clay (CCL) landfill cover, two pilot scale covers were constructed in side-by-side basin lysimeters (20m x 10m x 2m) at a site in Anchorage, Alaska. The primary basis of comparison between the two lysimeters was the percolation of moisture from the bottom of each lysimeter. Between 30 April 2005 and 16 May 2006, 51.5 mm of water percolated from the ET lysimeter, compared to 50.6 mm for the the CCL lysimeter. This difference was not found to be significant at the 95% confidence level. As part of the project, electrical resistivity tomography (ERT) was utilized to measure and map soil moisture in ET lysimeter cross sections. The ERT-generated cross sections were found to accurately predict the onset and duration of lysimeter percolation. Moreover, ERT-generated soil moisture values demonstrated a strong linear relationship to lysimeter percolation rates (R-Squared = 0.92). Consequently, ERT is proposed as a reliable tool for assessing the function of field scale ET covers in the absence of drainage measurement devices.

  4. RELIABILITY ANALYSIS OF THE ELECTRICAL POWER DISTRIBUTION SYSTEM TO SELECTED PORTIONS OF THE NUCLEAR HVAC SYSTEM

    International Nuclear Information System (INIS)

    Ramirez, N.

    2004-01-01

    A design requirement probability of 0.01 or less in a 4-hour period ensures that the nuclear heating, ventilation, and air-conditioning (HVAC) system in the primary confinement areas of the Dry Transfer Facilities (DTFs) and Fuel Handling Facility (FHF) is working during a Category 1 drop event involving commercial spent nuclear fuel (CSNF) assemblies (BSC 2004a , Section 5.1.1.48). This corresponds to an hourly HVAC failure rate of 2.5E-3 per hour or less, which is contributed to by two dominant causes: equipment failure and loss of electrical power. Meeting this minimum threshold ensures that a Category 1 initiating event followed by the failure of HVAC is a Category 2 event sequence. The two causes for the loss of electrical power include the loss of offsite power and the loss of onsite power distribution. Thus, in order to meet the threshold requirement aforementioned, the failure rate of mechanical equipment, loss of offsite power, and loss of onsite power distribution must be less than or equal to 2.5E-3 per hour for the nuclear HVAC system in the primary confinement areas of the DTFs and FHF. The loss of offsite power occurs at a frequency of 1.1E-5 per hour (BSC 2004a, Section 5.1.1.48). The purpose of this analysis is to determine the probability of occurrence of the unavailability of the nuclear HVAC system in the primary confinement areas of the DTFs and FHF due to loss of electrical power. In addition, this analysis provides insights on the contribution to the unavailability of the HVAC system due to equipment failure. The scope of this analysis is limited to finding the frequency of loss of electrical power to the nuclear HVAC system in the primary confinement areas of the DTFs and FHF

  5. Council of Europe Black Sea Area Project: International Cooperation for the Development of Activities Related to Donation and Transplantation of Organs in the Region.

    Science.gov (United States)

    Arredondo, E; López-Fraga, M; Chatzixiros, E; Senemaud, B; Brezovsky, P; Carella, C; Ballesté, C; Aydin Mehmet, A; Tomadze, G; Codreanu, I; Sarkissian, A A; Simeonova, M; Nikonenko, A; Zota, V; Gómez, M P; Manyalich, M; Bolotinha, C; Franca, A; Costa, A N; Ott, M-O; Buchheit, K-H

    2018-03-01

    In 2011, the European Directorate for the Quality of Medicines & Healthcare of the Council of Europe launched a 3-year collaborative project to address the organ shortage and improve access to transplant health services in Council of Europe member states in the Black Sea area (Armenia, Azerbaijan, Bulgaria, Georgia, Moldova, Romania, Turkey, Ukraine, and the Russian Federation) through the development of safe and ethical donation and transplantation programs. Support the development of donation and transplantation programs through close interstate cooperation between national health organizations and relevant stakeholders. Several work packages (WP) were established: WP1, project coordination (European Directorate for the Quality of Medicines & Healthcare); WP2, development and implementation of an effective legislative and financial framework (Czech Republic and France); WP3, establishment of National Transplant Authorities (Italy and Portugal); and WP4, clinical practices (DTI Foundation). Data collection, surveys, and expert visits allowed for the collection of first-hand information from each participant country at national, regional, and hospital levels. Data analysis showed the positive impact of the project represented by a tendency to increase the total donation rates (per million people) in the participant countries (2011 vs 2013): Azerbaijan, +7.3; Armenia, -0.7; Georgia, +3.3; Bulgaria, +0.9; Moldova, +2.5; Ukraine:, +0.8; Romania, +2.3; and Turkey, +2.7. Increases in total donation rates are the result of a number of initiatives in the Black Sea area, including the stepwise implementation of legislative, organizational and institutional country-specific recommendations tailored by the CoE, efforts of the respective Ministries of Health in each country and synergism with other European projects in the region. These countries should invest further in implementing the recommendations that emerged from this project to improve their organ donation

  6. A Study on Grid-Square Statistics Based Estimation of Regional Electricity Demand and Regional Potential Capacity of Distributed Generators

    Science.gov (United States)

    Kato, Takeyoshi; Sugimoto, Hiroyuki; Suzuoki, Yasuo

    We established a procedure for estimating regional electricity demand and regional potential capacity of distributed generators (DGs) by using a grid square statistics data set. A photovoltaic power system (PV system) for residential use and a co-generation system (CGS) for both residential and commercial use were taken into account. As an example, the result regarding Aichi prefecture was presented in this paper. The statistical data of the number of households by family-type and the number of employees by business category for about 4000 grid-square with 1km × 1km area was used to estimate the floor space or the electricity demand distribution. The rooftop area available for installing PV systems was also estimated with the grid-square statistics data set. Considering the relation between a capacity of existing CGS and a scale-index of building where CGS is installed, the potential capacity of CGS was estimated for three business categories, i.e. hotel, hospital, store. In some regions, the potential capacity of PV systems was estimated to be about 10,000kW/km2, which corresponds to the density of the existing area with intensive installation of PV systems. Finally, we discussed the ratio of regional potential capacity of DGs to regional maximum electricity demand for deducing the appropriate capacity of DGs in the model of future electricity distribution system.

  7. Disparity in regional cerebral blood flow during electrically induced seizure

    DEFF Research Database (Denmark)

    Sestoft, D; Meden, P; Hemmingsen, R

    1993-01-01

    on electroencephalography, the regional neuronal activity expressed as rCBF unexpectedly was markedly asymmetrical in one of the cases. These findings demonstrated that the 99mTc-HMPAO technique makes it possible to discriminate intraictal variation in cortical and subcortical activation between the hemispheres during...

  8. Regional comparison of nuclear and fossil electric power generation costs

    International Nuclear Information System (INIS)

    Bowers, H.I.

    1984-01-01

    Nuclear's main disadvantages are its high capital investment cost and uncertainty in schedule compared with alternatives. Nuclear plant costs continue to rise whereas coal plant investment costs are staying relative steady. Based on average experience, nuclear capital investment costs are nearly double those of coal-fired generation plants. The capital investment cost disadvantage of nuclear is balanced by its fuel cost advantages. New base load nuclear power plants were projected to be competitive with coal-fired plants in most regions of the country. Nuclear power costs wre projected to be significantly less (10% or more) than coal-fired power costs in the South Atlantic region. Coal-fired plants were projected to have a significant economic advantage over nuclear plants in the Central and North Central regions. In the remaining seven regions, the levelized cost of power from either option was projected to be within 10%. Uncertainties in future costs of materials, services, and financing affect the relative economics of the nuclear and coal options significantly. 10 figures

  9. Toward a Regional Geography of Renewable Electrical Energy Resources.

    Science.gov (United States)

    Pryde, Philip R.

    It is postulated that many types of renewable energy resources, like fossil fuels, are amenable to regional availability analysis. Among these are hydropower, geothermal, ocean temperature gradient, wind, and direct solar energy. A review of the spatial attributes of each of these types reveals areas of the United States that contain comparative…

  10. Day-Ahead Energy Planning with 100% Electric Vehicle Penetration in the Nordic Region by 2050

    DEFF Research Database (Denmark)

    Liu, Zhaoxi; Wu, Qiuwei; Nielsen, Arne Hejde

    2014-01-01

    This paper presents the day-ahead energy planning of passenger cars with 100% electric vehicle (EV) penetration in the Nordic region by 2050. EVs will play an important role in the future energy systems which can both reduce the greenhouse gas (GHG) emission from the transport sector and provide...... demand side flexibility required by the smart grids. On the other hand, the EVs will increase the electricity consumption. In order to quantify the electricity consumption increase due to the 100% EV penetration in the Nordic region to facilitate the power system planning studies, the day-ahead energy...

  11. Proposal of electric power generation from generators to water edge in the region of Sarapiqui

    International Nuclear Information System (INIS)

    Rodriguez Fallas, Cindy Veronica

    2013-01-01

    A proposed electric power generation is developed from generators to water edge in the region of Sarapiqui. The environmental characteristics, such as the hydrological network, hydrogeology, soil type, life zones, climatology, precipitation, temperature, evapotranspiration and water supply and demand, of rivers crossed by basin in the region of Sarapiqui, are determined by bibliographic consultations to implement the proposal. The most recent production statistics of the electric subsector of Costa Rica are described to reveal the growing annual demand and need for satisfaction. The zone of Sarapiqui is diagnosed as the right place to allow the generation of electric power from generators to water edge [es

  12. The effect of plant reliability improvement in the cost of generating electricity

    International Nuclear Information System (INIS)

    Nejat, S.; Sanders, R.C.; Tsoulfanidis, N.

    1982-01-01

    The objective of this investigation is to study the economic benefits in operating a nuclear power plant, as a result of improving the availability of the secondary (steam) loop of the plant. A new method has been developed to obtain availability, frequency of failure, probability and frequency of operation, cycle time, and uptime for different capacity states of a parallel series system having components with failure and repair rates distributed exponentially in time. The method has been applied to different subsystems, systems, and the secondary loop of a plant as a whole. The effect of having spare parts for several components, as measured by savings in the generation of electricity, is also studied. The Kettelle algorithm was applied to determine optimal allocation of spare parts to achieve maximum availability or minimum cost of electricity, subject to a fixed spare parts budget. The savings per year for optimal spare parts allocation and different spare parts budgets were obtained. The results show that the utility will save its customers a large amount of money if spare parts are purchased, especially at the beginning of the plant operation, and are allocated judiciously

  13. Reliability centered maintenance as an optimization tool for electrical power plants

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Bryla, P.; Martin-Mattei, C.; Meuwisse, C.

    1997-08-01

    Seven years ago, Electricite de France launched a Reliability Centered Maintenance (RCM) pilot project to optimize preventive maintenance for its nuclear power plants. After a feasibility study, a RCM method was standardized. It is now applied on a large scale to the 50 EDF nuclear units. A RCM workstation based on this standardized method has been developed and is now used in each plant. In the next step, it is considered whether a Risk based Approach can be included in this RCM process in order to analyze critical passive components such as pipes and supports. Considering the potential advantages of these optimization techniques, a dedicated process has been also developed for maintenance of future plants, gas turbines, or nuclear units. A survey of these different developments of methods and tools is presented. (author)

  14. The impact of faulty response of overload protection systems on the reliability of electricity supply

    International Nuclear Information System (INIS)

    Schweigert, J.; Schnuerer, G.

    1988-01-01

    Protection equipment of the engineered safety system which is to prevent the triggering of actions via signals from the reactor protection system is to be made so reliable that it has no impact on the non-availability of the supplied systems. Design and functional mode of the various overload protection equipment and the relevant switching device and combinations are explained together with the requirements such as choice, design, and adjustment of the protection equipment, followed by a survey of possible causes of faulty response of overload protection device and of the means and measures available for improvement. The now presented version of September 1987 of the 'overload protection report deals basically with all main topics of the Juli 1985 version, but has been updated and extended by material taking into account practice-oriented data on the new developments in convoy power plant design. (orig./HP) [de

  15. Relationship between Birkeland current regions, particle precipitation, and electric fields

    International Nuclear Information System (INIS)

    Beaujardiere, O. de la; Watermann, J.; Newell, P.; Rich, F.

    1993-01-01

    The authors study relationships between particle precipitation, currents, and convection, using data from DMSP observations and observations of the Sondrestrom radar. They adopt the classification of Newell et al., who defined five different classes of particle populations observed in satellite crossings of auroral regions. Observations were limited to prenoon local times. The advantage of the DMSP data is that it is part of a consistent 10 year observation mission which provides a broad replicated data set. It is difficult to specify with certainty the polar cap boundary from DMSP data alone

  16. Electric deregulation in Texas : the next steps

    International Nuclear Information System (INIS)

    Giuliani, R.

    2004-01-01

    This presentation provided a look at the deregulated market in Texas and provided some statistics and facts about the Electric Reliability Council of Texas (ERCOT) which monitors the reliability of 37,000 miles of power transmission lines and 77,000 MW of generation. The governance adopted by ERCOT was described along with market design and wholesale operation in terms of open access to transmission and distribution systems, reliability, timely conveyance of information needed to support customer choice, and accurate accountability for electricity production and delivery. Transmission has been one the greatest challenges facing ERCOT, but retail operations are progressing well despite initial start-up problems. tabs., figs

  17. Reliability evaluation of the power supply of an electrical power net for safety-relevant applications

    International Nuclear Information System (INIS)

    Dominguez-Garcia, Alejandro D.; Kassakian, John G.; Schindall, Joel E.

    2006-01-01

    In this paper, we introduce a methodology for the dependability analysis of new automotive safety-relevant systems. With the introduction of safety-relevant electronic systems in cars, it is necessary to carry out a thorough dependability analysis of those systems to fully understand and quantify the failure mechanisms in order to improve the design. Several system level FMEAs are used to identify the different failure modes of the system and, a Markov model is constructed to quantify their probability of occurrence. A new power net architecture with application to new safety-relevant automotive systems, such as Steer-by-Wire or Brake-by-Wire, is used as a case study. For these safety-relevant loads, loss of electric power supply means loss of control of the vehicle. It is, therefore, necessary and critical to develop a highly dependable power net to ensure power to these loads under all circumstances

  18. Electric power monthly, May 1999, with data for February 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatt hour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. 64 tabs.

  19. Electric power monthly: October 1996, with data for July 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    The Electric Power Monthly (EPM) presents monthly electricity statistics for a wide audience including Congress, Federal and State agencies, the electric utility industry, and the general public. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. This publication provides monthly statistics at the State, Census division, and US levels for net generation, fossil fuel consumption and stocks, quantity and quality of fossil fuels, cost of fossil fuels, electricity retail sales, associated revenue, and average revenue per kilowatthour of electricity sold. In addition, data on net generation, fuel consumption, fuel stocks, quantity and cost of fossil fuels are also displayed for the North American Electric Reliability Council (NERC) regions. The EIA publishes statistics in the EPM on net generation by energy source; consumption, stocks, quantity, quality, and cost of fossil fuels; and capability of new generating units by company and plant. This report contains approximately 60 tables.

  20. Using adaptive network based fuzzy inference system to forecast regional electricity loads

    International Nuclear Information System (INIS)

    Ying, L.-C.; Pan, M.-C.

    2008-01-01

    Since accurate regional load forecasting is very important for improvement of the management performance of the electric industry, various regional load forecasting methods have been developed. The purpose of this study is to apply the adaptive network based fuzzy inference system (ANFIS) model to forecast the regional electricity loads in Taiwan and demonstrate the forecasting performance of this model. Based on the mean absolute percentage errors and statistical results, we can see that the ANFIS model has better forecasting performance than the regression model, artificial neural network (ANN) model, support vector machines with genetic algorithms (SVMG) model, recurrent support vector machines with genetic algorithms (RSVMG) model and hybrid ellipsoidal fuzzy systems for time series forecasting (HEFST) model. Thus, the ANFIS model is a promising alternative for forecasting regional electricity loads

  1. Using adaptive network based fuzzy inference system to forecast regional electricity loads

    Energy Technology Data Exchange (ETDEWEB)

    Ying, Li-Chih [Department of Marketing Management, Central Taiwan University of Science and Technology, 11, Pu-tzu Lane, Peitun, Taichung City 406 (China); Pan, Mei-Chiu [Graduate Institute of Management Sciences, Nanhua University, 32, Chung Keng Li, Dalin, Chiayi 622 (China)

    2008-02-15

    Since accurate regional load forecasting is very important for improvement of the management performance of the electric industry, various regional load forecasting methods have been developed. The purpose of this study is to apply the adaptive network based fuzzy inference system (ANFIS) model to forecast the regional electricity loads in Taiwan and demonstrate the forecasting performance of this model. Based on the mean absolute percentage errors and statistical results, we can see that the ANFIS model has better forecasting performance than the regression model, artificial neural network (ANN) model, support vector machines with genetic algorithms (SVMG) model, recurrent support vector machines with genetic algorithms (RSVMG) model and hybrid ellipsoidal fuzzy systems for time series forecasting (HEFST) model. Thus, the ANFIS model is a promising alternative for forecasting regional electricity loads. (author)

  2. Final Report to the National Energy Technology Laboratory on FY09-FY13 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Vittal, Vijay [Arizona State Univ., Mesa, AZ (United States)

    2015-11-04

    The Consortium for Electric Reliability Technology Solutions (CERTS) was formed in 1999 in response to a call from U.S. Congress to restart a federal transmission reliability R&D program to address concerns about the reliability of the U.S. electric power grid. CERTS is a partnership between industry, universities, national laboratories, and government agencies. It researches, develops, and disseminates new methods, tools, and technologies to protect and enhance the reliability of the U.S. electric power system and the efficiency of competitive electricity markets. It is funded by the U.S. Department of Energy’s Office of Electricity Delivery and Energy Reliability (OE). This report provides an overview of PSERC and CERTS, of the overall objectives and scope of the research, a summary of the major research accomplishments, highlights of the work done under the various elements of the NETL cooperative agreement, and brief reports written by the PSERC researchers on their accomplishments, including research results, publications, and software tools.

  3. A roadmap for production of sustainable, consistent and reliable electric power from agricultural biomass- An Indian perspective

    International Nuclear Information System (INIS)

    Singh, Jaswinder

    2016-01-01

    The utilization of agricultural biomass for production of electric power can help to reduce the environmental emissions while achieving energy security and sustainable development. This paper presents a methodology for estimating the power production potential of agricultural biomass in a country. Further, the methodology has been applied to develop a roadmap for producing reliable power in India. The present study reveals that about 650 Mt/year of agricultural biomass is generated in India, while about one-third of this has been found to be surplus for energy applications. The cereal crops have major contribution (64.60%) in production of surplus biomass followed by sugarcane (24.60%) and cotton (10.68%). The energy potential of these resources is of the order of 3.72 EJ, which represents a significant proportion of the primary energy consumption in the country. These biomass resources can produce electric power of 23–35 GW depending upon the efficiency of thermal conversion. The delivery of biomass to the plants and selection of appropriate technology have been found as the major issues that need to be resolved carefully. In the end, the study summarizes various technological options for biomass collection and utilization that can be used for producing clean and consistent power supply. - Highlights: •The production of bioelectricity in India is imperative and inevitable. •About one-third of the agricultural biomass is available for power generation. •The power potential of these resources is of the order of 23–31 GW. •The delivery of biomass to plants and technology selection are the key issues. •India should exploit these resources for producing clean and reliable power.

  4. Hybrid instrument applied to human reliability study in event of loss of external electric power in a nuclear power plant

    International Nuclear Information System (INIS)

    Martins, Eduardo Ferraz

    2015-01-01

    The study projects in highly complex installations involves robust modeling, supported by conceptual and mathematical tools, to carry out systematic research and structured the different risk scenarios that can lead to unwanted events from occurring equipment failures or human errors. In the context of classical modeling, the Probabilistic Safety Analysis (PSA) seeks to provide qualitative and quantitative information about the project particularity and their operational facilities, including the identification of factors or scenarios that contribute to the risk and consequent comparison options for increasing safety. In this context, the aim of the thesis is to develop a hybrid instrument (CPP-HI) innovative, from the integrated modeling techniques of Failure Mode and Effect Analysis (FMEA), concepts of Human Reliability Analysis and Probabilistic Composition of Preferences (PCP). In support of modeling and validation of the CPP-HI, a simulation was performed on a triggering event 'Loss of External Electric Power' - PEEE, in a Nuclear Power plant. The results were simulated in a virtual environment (sensitivity analysis) and are robust to the study of Human Reliability Analysis (HRA) in the context of the PSA. (author)

  5. 18 CFR 39.13 - Regional Advisory Bodies.

    Science.gov (United States)

    2010-04-01

    ... THE ELECTRIC RELIABILITY ORGANIZATION; AND PROCEDURES FOR THE ESTABLISHMENT, APPROVAL, AND ENFORCEMENT OF ELECTRIC RELIABILITY STANDARDS § 39.13 Regional Advisory Bodies. (a) The Commission will establish... same region; (2) Whether a Reliability Standard proposed to apply within the region is just, reasonable...

  6. Modeling Ontario regional electricity system demand using a mixed fixed and random coefficients approach

    Energy Technology Data Exchange (ETDEWEB)

    Hsiao, C.; Mountain, D.C.; Chan, M.W.L.; Tsui, K.Y. (University of Southern California, Los Angeles (USA) McMaster Univ., Hamilton, ON (Canada) Chinese Univ. of Hong Kong, Shatin)

    1989-12-01

    In examining the municipal peak and kilowatt-hour demand for electricity in Ontario, the issue of homogeneity across geographic regions is explored. A common model across municipalities and geographic regions cannot be supported by the data. Considered are various procedures which deal with this heterogeneity and yet reduce the multicollinearity problems associated with regional specific demand formulations. The recommended model controls for regional differences assuming that the coefficients of regional-seasonal specific factors are fixed and different while the coefficients of economic and weather variables are random draws from a common population for any one municipality by combining the information on all municipalities through a Bayes procedure. 8 tabs., 41 refs.

  7. Electrometallurgy company Influence to the Electric Power System of Macedonia and their future participation in the conditions of an open electricity market in Macedonia and the Region

    International Nuclear Information System (INIS)

    Jarmov, Gjorgi; Popovski, Ljubin; Aleksoski, Borko

    2001-01-01

    In this paper the basic characteristics of the electric power consumption in the R. Macedonia for the 2000 year are given. The large electric power consumers are presented, as well as possibilities of their participation in the conditions of an open electricity market in Macedonia and the Region

  8. Spot markets vs. long-term contracts - modelling tools for regional electricity generating utilities

    International Nuclear Information System (INIS)

    Grohnheit, P.E.

    1999-01-01

    A properly organised market for electricity requires that some information will be available for all market participants. Also a range of generally available modelling tools are necessary. This paper describes a set of simple models based on published data for analyses of the long-term revenues of regional utilities with combined heat and power generation (CHP), who will operate a competitive international electricity market and a local heat market. The future revenues from trade on the spot market is analysed using a load curve model, in which marginal costs are calculated on the basis of short-term costs of the available units and chronological hourly variations in the demands for electricity and heat. Assumptions on prices, marginal costs and electricity generation by the different types of generating units are studied for selected types of local electricity generators. The long-term revenue requirements to be met by long-term contracts are analysed using a traditional techno-economic optimisation model focusing on technology choice and competition among technologies over 20.30 years. A possible conclusion from this discussion is that it is important for the economic and environmental efficiency of the electricity market that local or regional generators of CHP, who are able to react on price signals, do not conclude long-term contracts that include fixed time-of-day tariff for sale of electricity. Optimisation results for a CHP region (represented by the structure of the Danish electricity and CHP market in 1995) also indicates that a market for CO 2 tradable permits is unlikely to attract major non-fossil fuel technologies for electricity generation, e.g. wind power. (au)

  9. The Nuclear option for U.S. electrical generating capacity additions utilizing boiling water reactor technology

    International Nuclear Information System (INIS)

    Garrity, T.F.; Wilkins, D.R.

    1993-01-01

    The technology status of the Advanced Boiling Water (ABWR) and Simplified Boiling Water (SBWR) reactors are presented along with an analysis of the economic potential of advanced nuclear power generation systems based on BWR technology to meet the projected domestic electrical generating capacity need through 2005. The forecasted capacity needs are determined for each domestic North American Electric Reliability Council (NERC) region. Extensive data sets detailing each NERC region's specific generation and load characteristics, and capital and fuel cost parameters are utilized in the economic analysis of the optimal generation additions to meet this need by use of an expansion planning model. In addition to a reference case, several sensitivity cases are performed with regard to capital costs and fuel price escalation

  10. Study of reliability for the electricity cogeneration and seawater desalination in the Northwest of Mexico

    International Nuclear Information System (INIS)

    Hernandez U, G. O.; Ortega C, R. F.

    2008-01-01

    were costs very competitive of 0.038-0.044 $/ kWh for the production of electric energy and of 0.60 at 0.77 $/ m 3 for the produced water, with a lost of power in the generation of among 28 to 43 MW e . (Author)

  11. The financial and accounting implications of the privatization of the regional electricity companies in the UK

    International Nuclear Information System (INIS)

    Thomson, L.

    1993-01-01

    This paper reviews some of the financial and accounting implications of the privatization of the electricity distribution and supply sector in England and Wales, specifically the transformation of the Electricity Area Boards into the 12 Regional Electricity Companies (RECs). It considers the factors influencing the setting of post-privatization price control factors; the capital restructuring of the RECs; the valuation placed by the Secretary of State for Energy on each company at flotation, and market reaction to this as shown in subsequent changes in share price; and changes in the information provided in the RECs' accounts over the privatization period. (Author)

  12. A model for reliability avaliation of the electrical supply source of the 1A3 and 1A4 control rods assemblies of Angra I reactor

    International Nuclear Information System (INIS)

    Yang, T.

    1978-01-01

    The reliability of the electrical power supply to the 4.16KV buses for the safety system operation of a nuclear power plant was studied. Particularly, Angra Unit I system was focused. Initially, reliability of each electrical supply source was estimated. Using a probabilistic approach based on the Markov processes, the system reliability was evaluated in terms of frequency and duration of loss of power supply and of the system failure probability evolution when one or more sources remained unavailable. Based on these results, certain reactor operating rules were proposed concerning later shutdown of the plant without compromising the nuclear reactor safety. A sensitivity analysis was also performed to show the different reliability parameter influences on final results. This analysis showed that the diesel system performs an important role in the power supply for a nuclear power plant [pt

  13. Investigation on the electrical characteristics of a pentacene thin-film transistor and its reliability under positive drain bias stress

    International Nuclear Information System (INIS)

    Fan, Ching-Lin; Chiu, Ping-Cheng; Lin, Yu-Zuo; Yang, Tsung-Hsien; Chiang, Chin-Yuan

    2011-01-01

    This study systematically investigates the effects of pentacene deposition rates and channel lengths on the electrical characteristics of pentacene-based organic thin-film transistors (OTFTs), and the performance degradation of OTFTs under the positive drain bias stress. With a slower deposition rate of the pentacene channel layer, the larger grain size is formed, and it improves the performance of pentacene-based OTFTs. As the channel length decreases, the threshold voltage (V TH ) shifts toward the positive direction and the field-effect mobility (µ FE ) decreases, which are due to the drain-induced barrier lowering effect and the lower mobility in the active channel near the region of source/drain electrodes, respectively. In addition, we also propose a mechanism to present the channel length dependence on the field-effect mobility. Results also show that the pentacene-based OTFTs, which are under positive drain bias stress, exhibit greater performance degradation than those under negative drain bias stress. The greater performance degradation, the decreasing I ON and the larger V TH shift are due to the greater trap state density (N trap ) created in the bulk channel by the large lateral electrical field and the carriers injected into the gate insulator by the large vertical electrical field, respectively

  14. Is the omega sign a reliable landmark for the neurosurgical team? An anatomical study about the central sulcus region

    Directory of Open Access Journals (Sweden)

    Thiago Rodrigues

    2015-11-01

    Full Text Available ABSTRACTThe central sulcus region is an eloquent area situated between the frontal and parietal lobes. During neurosurgical procedures, it is sometimes difficult to understand the cortical anatomy of this region.Objective Find alternative ways to anatomically navigate in this region during neurosurgical procedures.Method We analyzed eighty two human hemispheres using a surgical microscope and completed a review of the literature about central sulcus region.Results In 68/82 hemispheres, the central sulcus did not reach the posterior ramus of the lateral sulcus. A knob on the second curve of the precentral gyrus was reliably identified in only 64/82 hemispheres.Conclusion The morphometric data presented in this article can be useful as supplementary method to identify the central sulcus region landmarks.

  15. Testing for convergence in electricity consumption across Croatian regions at the consumer's sectoral level

    International Nuclear Information System (INIS)

    Borozan, Djula

    2017-01-01

    Using the panel unit tests with and without structural break(s), the convergence hypothesis in relative per capita electricity consumption series is tested across Croatian regions during the period 2001–2013. The results are mixed, depending primarily on the consumption sector considered and the test applied. They indicate the necessity to conduct analysis and formulate energy policy measures on the sector-disaggregated and regional-specific electricity consumption time series. The Croatian electricity markets are not fully integrated, and some regions are faced with statistically significant structural break(s), demonstrating thereby the Croatian gradual energy reform process with several sudden innovations, significant regional differences, and the market dependence on expectations, domestic and international economic and non-economic innovations. The impacts of innovations are likely to be permanent for most of the regions, and their electricity consumption behaviours are likely to be path dependent. Consequently, innovations into the energy markets, including government interventions, may have long-run effects, indicating that space and time for experimenting with alternative mechanisms are quite limited.

  16. Impact Analysis of Transportation Modal Shift on Regional Energy Consumption and Environmental Level: Focused on Electric Automobiles

    OpenAIRE

    Hong Bae Kim; Chang Ho Hur

    2016-01-01

    Many governments have tried to reduce CO2 emissions which are believed to be the main cause for global warming. The deployment of electric automobiles is regarded as an effective way to reduce CO2 emissions. The Korean government has planned to deploy about 200,000 electric automobiles. The policy for the deployment of electric automobiles aims at not only decreasing gasoline consumption but also increasing electricity production. However, if an electricity consuming regions is not consistent...

  17. Improving the principles of short-term electric load forecasting of the Irkutsk region

    Directory of Open Access Journals (Sweden)

    Kornilov Vladimir

    2017-01-01

    Full Text Available Forecasting of electric load (EL is an important task for both electric power entities and large consumers of electricity [1]. Large consumers are faced with the need to compose applications for the planned volume of EL, and the deviation of subsequent real consumption from previously announced leads to the appearance of penalties from the wholesale market. In turn, electricity producers are interested in forecasting the demand for electricity for prompt response to its fluctuations and for the purpose of optimal infrastructure development. The most difficult and urgent task is the hourly forecasting of EL, which is extremely important for the successful solution of problems of optimization of generating capacities, minimization of power losses, dispatching control, security assessment of power supply, etc. Ultimately, such forecasts allow optimizing the cash costs for electricity and fuel or water consumption during generation. This paper analyzes the experience of the branch of JSC "SO UPS" Irkutsk Regional Dispatch Office of the procedure for short-term forecasting of the EL of the Irkutsk region.

  18. Direct Electrical Stimulation of the Human Entorhinal Region and Hippocampus Impairs Memory.

    Science.gov (United States)

    Jacobs, Joshua; Miller, Jonathan; Lee, Sang Ah; Coffey, Tom; Watrous, Andrew J; Sperling, Michael R; Sharan, Ashwini; Worrell, Gregory; Berry, Brent; Lega, Bradley; Jobst, Barbara C; Davis, Kathryn; Gross, Robert E; Sheth, Sameer A; Ezzyat, Youssef; Das, Sandhitsu R; Stein, Joel; Gorniak, Richard; Kahana, Michael J; Rizzuto, Daniel S

    2016-12-07

    Deep brain stimulation (DBS) has shown promise for treating a range of brain disorders and neurological conditions. One recent study showed that DBS in the entorhinal region improved the accuracy of human spatial memory. Based on this line of work, we performed a series of experiments to more fully characterize the effects of DBS in the medial temporal lobe on human memory. Neurosurgical patients with implanted electrodes performed spatial and verbal-episodic memory tasks. During the encoding periods of both tasks, subjects received electrical stimulation at 50 Hz. In contrast to earlier work, electrical stimulation impaired memory performance significantly in both spatial and verbal tasks. Stimulation in both the entorhinal region and hippocampus caused decreased memory performance. These findings indicate that the entorhinal region and hippocampus are causally involved in human memory and suggest that refined methods are needed to use DBS in these regions to improve memory. Copyright © 2016 Elsevier Inc. All rights reserved.

  19. Predicting the electricity demand of an oil industry region on the basis of a stochastic model

    Energy Technology Data Exchange (ETDEWEB)

    Ragimova, R A; Khaykin, I Ye

    1979-01-01

    A justified decision to accept a particular development design may be made only on the basis of a scientific prediction of the basic technical and economic indicators. Used as the basic factor which impacts on the electricity demand is the total oil production and the flow of the total liquid pumped from the bowels of the earth. The initial information is statistical data about the expenditure of electricity, the oil and liquid production for 8-10 years. The existence is accepted of a direct relation between the resultive and the factorial signs. Based on a normal law of distribution of random errors, reliable probabilities are found for determining the electricity demand of an object with an assigned degree of precision. Calculations through the proposed model in the practical work of the energy services make it possible to expose the degree of quantitative influence of the basic parameters of the development of a deposit on the value of the expenditure of electricity and to justifiably predict the electricity demand for oil production.

  20. Electric field measurements in a NLC/PMSE region during the MASS/ECOMA campaign

    Directory of Open Access Journals (Sweden)

    M. Shimogawa

    2009-04-01

    Full Text Available We present results of electric field measurements made during the MASS rocket campaign in Andøya, Norway into noctilucent clouds (NLC and polar mesospheric summer echoes (PMSE on 3 August 2007. The instrument used high input-impedance preamps to measure vertical and horizontal electric fields. No large-amplitude geophysical electric fields were detected in the cloud layers, but significant levels of electric field fluctuations were measured. Within the cloud layer, the probe potentials relative to the rocket skin were driven negative by incident heavy charged aerosols. The amplitude of spikes caused by probe shadowing were also larger in the NLC/PMSE region. We describe a method for calculating positive ion conductivities using these shadowing spike amplitudes and the density of heavy charged aerosols.

  1. The Effect of Mitigation Policy on Regional Climate Impacts on the U.S. Electric Sector

    Science.gov (United States)

    Cohen, S. M.; Sun, Y.; Strzepek, K.; McFarland, J.; Boehlert, B.; Fant, C.

    2017-12-01

    Climate change can influence the U.S. electricity sector in many ways, the nature of which can be shaped by energy and environmental policy choices. Changing temperatures affect electricity demand largely through heating and cooling needs, and temperatures also affect generation and transmission system performance. Altered precipitation patterns affect the regional and seasonal distribution of surface water runoff, which changes hydropower operation and thermal cooling water availability. The extent to which these stimuli influence U.S. power sector operation and planning will depend to some extent on whether or not proactive policies are enacted to mitigate these impacts. Mitigation policies such as CO2 emissions limits or technology restrictions can change the makeup of the electricity system while reducing the extent of climate change itself. We use the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS), a U.S. electric sector capacity expansion model, to explore electric sector evolution through 2050 under alternative climate and policy assumptions. The model endogenously represents climate impacts on load, power system performance, cooling water availability, and hydropower, allowing internally consistent system responses to climate change along with projected technology, market, and policy conditions. We compare climate impacts across 5 global circulation models for a 8.5 W/m2 representative concentration pathway (RCP) without a climate mitigation policy and a 4.5 W/m2 RCP with climate mitigation. Climate drivers affect the capacity and generation mix at the national and regional levels, with relative growth of wind, solar, and natural gas-based technologies depending on local electricity system characteristics. These differences affect regional economic impacts, measured here as changes to electricity price and system costs. Mitigation policy reduces the economic and system impacts of climate change largely by moderating

  2. The effect of merger and consolidation activities on the efficiency of electricity distribution regions in Turkey

    International Nuclear Information System (INIS)

    Çelen, Aydın

    2013-01-01

    In this study, we analyze the efficiency performances of Turkish electricity distribution companies throughout 2002 and 2009 in the stochastic frontier analysis (SFA) framework. Our more specific goal is to measure how the efficiency performances of the electricity distribution regions were affected by the mergers between distribution regions occurred in 2005. The results demonstrate that efficiencies of the companies serving to mostly the residential customers are higher than those of other companies. However, the positive impact of residential customers on the efficiencies decreased significantly following the mergers between electricity distribution companies. In contrast, the positive impact of higher customer density on efficiency also decreased, but insignificantly following the restructuring activities in the market in 2005. Our study also witnesses that the positive impact of the mergers on the efficiencies decreases as the proportion of sales to residential customers in regions increases. In contrast, the restructuring activities of 2005 increased equally the efficiencies of the companies serving in the regions with higher and lower customer densities. - Highlights: • We analyze efficiency performances of Turkish electricity distribution companies. • The efficiencies of companies serving to mostly residential customers are higher. • Positive impact of residential customers on the efficiencies dropped after mergers. • Positive impact of customer density also decreased, but insignificantly. • Positive impact of mergers on efficiency decreases as sales to residents increase

  3. On-site A.C. electric power sources for 900 MWe French nuclear power reactors: reliability and importance for safety

    Energy Technology Data Exchange (ETDEWEB)

    Milhem, J. L.; Gros, G. [Commissariat a l' Energie Atomique, Institut de Protection et Surete Nucleaire, Departement d' Analyse de Surete, B.P. No. 6, 92260 Fontenay-aux-Roses (France)

    1986-02-15

    After presenting briefly the new provisions laid down by the Electricite de France to meet a total electrical power loss, the main elements of the probabilistic study concerning the corresponding risk described: reliability data of internal sources used, results of risk Improvement brought by the new measures, importance for Internal source before and after Implementation of the new measures. (authors)

  4. On-site A.C. electric power sources for 900 MWe french nuclear power reactors: reliability and importances for safety

    International Nuclear Information System (INIS)

    Milhem, J.L.; Gros, G.

    1985-10-01

    After presenting briefly the new provisions laid down by the Electricite de France to meet a total electrical power loss, the main elements of the probabilistic study concerning the corresponding risk are described: reliability data of internal sources used, results of risk improvement brought by the new measures, importance for internal source before and after implementation of the new measures

  5. 75 FR 39244 - Reliability Standards Development and NERC and Regional Entity Enforcement; Further Notice...

    Science.gov (United States)

    2010-07-08

    ... Standards Development and NERC and Regional Entity Enforcement; Further Notice Concerning Technical... convene a Commissioner-led technical conference regarding issues pertaining to the development of... Corporation and the Regional Entities as previously announced.\\1\\ \\1\\ Notice of Technical Conference, 75 FR 35...

  6. Reliability of the electric power supply in the safety apparatus of nuclear power plants: a comparative analysis

    International Nuclear Information System (INIS)

    Cruz, L.A.

    1992-01-01

    This paper discusses the risk of total loss of electric power supply to the Class 1E system. Two alternatives are focused: a system with two off-site and two onsite power supplies emergency power supply, as recommended by the American Regulations, and a system with only one off-site and four on-site power supplies, applicable when two off-site are not available. To allow the fact that the equipment can be repaired, the method proper involves use of the Markov model, with which one can find, for each configuration of the system, the change over time of the probability of a simultaneous failure of all power sources. The sensitivity of each parameter is studied in each case and, on the basis of the results of the study, the author conclude that the system with two off-site power supplies is preferable in all alternatives analysed, although the system with one off-site power supply can be adopted with high reliability diesel-generators. (author)

  7. Evaluation of the reliability of electric power transmission systems; Evaluacion de confiabilidad de sistemas de transmision de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Vega Ortiz, Miguel

    1989-07-01

    In this thesis it is attacked the problem of Reliability Evaluation of the Electrical Power Transmission Systems for aims of its integral planning. Once described the problem the indexes that measure the electric power systems reliability are presented. Later the methods to evaluate the transmission nets, such as the Contingencies Enumeration, the Monte Carlo, the one of Markov and the methods for complex systems such as the Minimum Interruptions, are described. This last one is widely developed for the advantages that its application presents in the planning of large and complex networks. The method of minimum interruptions consists of two big steps: To determine the minimum interruptions for the load points and to calculate the reliability indexes in base of the minimum interruptions. The conventional algorithms for the determination of minimum interruptions consider a problem for each load point in an independent form going through a determination of minimum tracks. In this type of algorithms the CPU time and the space in memory required grow exponentially for the case of large transmission systems, which represents a strong restriction for its application. In order to solve this problem a methodology was established in which the system is modeled by means of a grapho and the minimum interruptions are determined with an algorithm based on the construction of cycles in the dual grapho. With these interruptions the connectivity and the capacity of the network is evaluated, obtaining the reliability indexes for each bus and the system. These indexes are calculated with the equivalent representation for complex systems of series parallel connections defined by the minimum interruptions. One of the fundamental objectives in this study is to integrate the reliability to the planning process, with the concept of the expected value of the non-supplied energy and its penalty cost. In order to demonstrate the capacity, effectiveness and rapidity of the new implemented

  8. Strategy of Trade-Reliable Featured Product Supporting Regional Innovation Systems

    Science.gov (United States)

    Riskiawan, H. Y.; Purnomo, B. H.; Abdurahman, A.; Hariono, B.; Puspitasari, T. D.

    2018-01-01

    Pacitan, Ponorogo, and Magetan had planned the development of featured products as contained in the Medium Term Development Plan (MTDP) until 2020. The focus of development is almost similar to featured products derived from agribusiness, food processing, handycrafts, and tourism. The geographical proximity results characteristics of natural resources and social culture have similarities, including the type of featured products, constraints, problems, and opportunities for development. Given the characteristics and the support system of some featured products contained in these three regions have a lot in common and their functional interactions involving actors from across the region, it is necessary to develop cross-jurisdictional policy. The resulting strategy should be able to support the development of Regional Innovation System (RIS). The purpose of this research is 1) Determining featured product cross-regional between Pacitan regency; Ponorogo and Magetan districts in support of RIS development; and 2) Designing a featured product development strategy using supply chain management in order to drive the local economy. Based on the results of research conducted, featured products across the region that have potentiality to be developed are: processed products of “janggelan” leather products, and woven bamboo.

  9. BECCS Market Launch Strategy Aiming to Help Ensure Reliable Grid Power at High Penetrations of IRE (Intermittent Renewable Electricity)

    Science.gov (United States)

    WIlliams, R. H.

    2017-12-01

    Despite its recognized importance for carbon (C)-mitigation, progress in advancing biomass energy with CO2 capture and sequestration (BECCS) has been slow. A BECCS market launch strategy based on technologies ready for commercial-scale demonstration is discussed—based on co-gasification of coal and biomass to make H2 with CCS. H2 so produced would be a key element of a H2 balancing capacity (H2-BC) strategy for ensuring reliable grid power at high IRE penetrations. High grid penetrations of IRE must be complemented by fast-ramping balancing (backup and/or storage) capacity (BC) to ensure reliable grid power. BC provided now by natural gas-fired gas turbine combined cycle and combustion turbine units would eventually have to be decarbonized to realize C-mitigation goals, via CCS or other means. Capital-intensive CCS energy systems require baseload operation to realize favourable economics, but at high IRE penetrations, BC plants must be operated at low capacity factors. A H2-BC strategy is a promising way to address this challenge. The elements of a H2-BC system are: (a) H2 production from carbonaceous feedstocks in baseload plants with CCS; (b) H2 consumption in fast-ramping BC units that operate at low capacity factors; (c) Buffer underground H2 storage to enable decoupling baseload H2 production from highly variable H2 consumption by BC units. The concept is likely to "work" because underground H2 storage is expected to be inexpensive. A H2 production analysis is presented for a negative GHG-emitting H2-BC system based on cogasification of corn stover and coal, with captured CO2 used for enhanced oil recovery. The technical readiness of each system component is discussed, and preliminary insights are offered as to the conditions under which the corresponding H2-BC system might compete with natural gas in providing backup for IRE on US electric grids. Public policy to help advance this strategy might be forthcoming, because 2 US Senate bills with broad

  10. Assessing regional lung mechanics by combining electrical impedance tomography and forced oscillation technique.

    Science.gov (United States)

    Ngo, Chuong; Spagnesi, Sarah; Munoz, Carlos; Lehmann, Sylvia; Vollmer, Thomas; Misgeld, Berno; Leonhardt, Steffen

    2017-08-29

    There is a lack of noninvasive pulmonary function tests which can assess regional information of the lungs. Electrical impedance tomography (EIT) is a radiation-free, non-invasive real-time imaging that provides regional information of ventilation volume regarding the measurement of electrical impedance distribution. Forced oscillation technique (FOT) is a pulmonary function test which is based on the measurement of respiratory mechanical impedance over a frequency range. In this article, we introduce a new measurement approach by combining FOT and EIT, named the oscillatory electrical impedance tomography (oEIT). Our oEIT measurement system consists of a valve-based FOT device, an EIT device, pressure and flow sensors, and a computer fusing the data streams. Measurements were performed on five healthy volunteers at the frequencies 3, 4, 5, 6, 7, 8, 10, 15, and 20 Hz. The measurements suggest that the combination of FOT and EIT is a promising approach. High frequency responses are visible in the derivative of the global impedance index ΔZeit(t,fos). $\\Delta {Z_{{\\text{eit}}}}(t,{f_{{\\text{os}}}}).$ The oEIT signals consist of three main components: forced oscillation, spontaneous breathing, and heart activity. The amplitude of the oscillation component decreases with increasing frequency. The band-pass filtered oEIT signal might be a new tool in regional lung function diagnostics, since local responses to high frequency perturbation could be distinguished between different lung regions.

  11. The promotion of regional integration of electricity markets: Lessons for developing countries

    International Nuclear Information System (INIS)

    Oseni, Musiliu O.; Pollitt, Michael G.

    2016-01-01

    This paper focuses on how to promote regional cooperation in electricity. We begin by discussing the theory of international trade cooperation in electricity, with a view to discussing what preconditions might be important in facilitating wide area trading across national borders. We then develop lessons based on the comparison of four case studies. These include three regional developing country power pools – the Southern African Power pool (SAPP), West African Power pool (WAPP) and the Central American Power Market (MER). We contrast these with Northern Europe's Nord Pool. These cases highlight both the potential and difficulty of having cross-jurisdictional power pools. In the light of the theory and evidence we present, we draw key lessons in the areas of: preconditions for trading; necessary institutional arrangements; practicalities of timetabling; reasons to be hopeful about future prospects. - Highlights: • This paper focuses on how to promote regional electricity cooperation. • We develop lessons based on comparison of four international case studies. • The cases highlight both the potential and difficulty of power pools. • We identify preconditions, institutional arrangements and timetabling. • We conclude that the future prospects for regional power pools are good.

  12. Guide to the collection and presentation of electrical, electronic, and sensing component reliability data for nuclear-power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This Guide is intended to establish a method of collecting and presenting reliability data for quantitative systematic reliability analysis in nuclear power generating stations, as outlined in IEEE Std 351-1975. Appendix D, which is not a part of IEEE Std 500-1977 but which comprises the bulk of this publication, presents tables of reliability data for nuclear power generating stations, intended for use of nuclear systems reliability analysts or design engineers

  13. Regional respiratory inflation and deflation pressure-volume curves determined by electrical impedance tomography.

    Science.gov (United States)

    Frerichs, I; Dargaville, P A; Rimensberger, P C

    2013-06-01

    Measurement of regional lung volume changes during a quasi-static pressure-volume (PV) manoeuvre using electrical impedance tomography (EIT) could be used to assess regional respiratory system mechanics and to determine optimal ventilator settings in individual patients. Using this approach, we studied regional respiratory system mechanics in healthy and lung-injured animals, before and after surfactant administration during inflation and deflation PV manoeuvres. The comparison of the EIT-derived regional PV curves in ventral, middle and dorsal regions of the right and left lungs showed not only different amounts of hysteresis in these regions but also marked differences among different landmark pressures calculated on the inflation and deflation limbs of the curves. Regional pressures at maximum compliance as well as the lower and upper pressures of maximum compliance change differed between the inflation and deflation and increased from ventral to dorsal regions in all lung conditions. All these pressure values increased in the injured and decreased in the surfactant treated lungs. Examination of regional respiratory system mechanics using EIT enables the assessment of spatial and temporal heterogeneities in the ventilation distribution. Characteristic landmarks on the inflation and especially on the deflation limb of regional PV curves may become useful measures for guiding mechanical ventilation.

  14. Regional respiratory inflation and deflation pressure–volume curves determined by electrical impedance tomography

    International Nuclear Information System (INIS)

    Frerichs, I; Dargaville, P A; Rimensberger, P C

    2013-01-01

    Measurement of regional lung volume changes during a quasi-static pressure–volume (PV) manoeuvre using electrical impedance tomography (EIT) could be used to assess regional respiratory system mechanics and to determine optimal ventilator settings in individual patients. Using this approach, we studied regional respiratory system mechanics in healthy and lung-injured animals, before and after surfactant administration during inflation and deflation PV manoeuvres. The comparison of the EIT-derived regional PV curves in ventral, middle and dorsal regions of the right and left lungs showed not only different amounts of hysteresis in these regions but also marked differences among different landmark pressures calculated on the inflation and deflation limbs of the curves. Regional pressures at maximum compliance as well as the lower and upper pressures of maximum compliance change differed between the inflation and deflation and increased from ventral to dorsal regions in all lung conditions. All these pressure values increased in the injured and decreased in the surfactant treated lungs. Examination of regional respiratory system mechanics using EIT enables the assessment of spatial and temporal heterogeneities in the ventilation distribution. Characteristic landmarks on the inflation and especially on the deflation limb of regional PV curves may become useful measures for guiding mechanical ventilation. (paper)

  15. C-arm fluoroscopy: a reliable modality for retrieval of foreign bodies in the maxillofacial region.

    Science.gov (United States)

    Pandyan, Deepak; Nandakumar, N; Qayyumi, Burhanuddin N; Kumar, Santosh

    2013-11-01

    The anatomic complexity of the maxillofacial region makes the retrieval of foreign bodies a daunting task for the maxillofacial Surgeon. Moreover the inability of 2-dimensional imaging to precisely locate foreign bodies makes it challenging. The anatomic proximity of critical structures and esthetic considerations limits the access and thus poses a greater challenge for the surgeon in cases of foreign body retrieval. Hereby we propose a simple technique and a case report to support, the retrieval of small (mobile C arm Fluoroscopy and a needle triangulation method to precisely locate a loosened miniplate screw in the mandibular angle region.

  16. Electromagnetic Pulse of a Vertical Electric Dipole in the Presence of Three-Layered Region

    Directory of Open Access Journals (Sweden)

    D. Cheng

    2015-01-01

    Full Text Available Approximate formulas are obtained for the electromagnetic pulses due to a delta-function current in a vertical electric dipole on the planar surface of a perfect conductor coated by a dielectric layer. The new approximated formulas for the electromagnetic field in time domain are retreated analytically and some new results are obtained. Computations and discussions are carried out for the time-domain field components radiated by a vertical electric dipole in the presence of three-layered region. It is shown that the trapped-surface-wave terms should be included in the total transient field when both the vertical electric dipole and the observation point are on or near the planar surface of the dielectric-coated earth.

  17. Mission Analysis and Aircraft Sizing of a Hybrid-Electric Regional Aircraft

    Science.gov (United States)

    Antcliff, Kevin R.; Guynn, Mark D.; Marien, Ty V.; Wells, Douglas P.; Schneider, Steven J.; Tong, Michael T.

    2016-01-01

    The purpose of this study was to explore advanced airframe and propulsion technologies for a small regional transport aircraft concept (approximately 50 passengers), with the goal of creating a conceptual design that delivers significant cost and performance advantages over current aircraft in that class. In turn, this could encourage airlines to open up new markets, reestablish service at smaller airports, and increase mobility and connectivity for all passengers. To meet these study goals, hybrid-electric propulsion was analyzed as the primary enabling technology. The advanced regional aircraft is analyzed with four levels of electrification, 0 percent electric with 100 percent conventional, 25 percent electric with 75 percent conventional, 50 percent electric with 50 percent conventional, and 75 percent electric with 25 percent conventional for comparison purposes. Engine models were developed to represent projected future turboprop engine performance with advanced technology and estimates of the engine weights and flowpath dimensions were developed. A low-order multi-disciplinary optimization (MDO) environment was created that could capture the unique features of parallel hybrid-electric aircraft. It is determined that at the size and range of the advanced turboprop: The battery specific energy must be 750 watt-hours per kilogram or greater for the total energy to be less than for a conventional aircraft. A hybrid vehicle would likely not be economically feasible with a battery specific energy of 500 or 750 watt-hours per kilogram based on the higher gross weight, operating empty weight, and energy costs compared to a conventional turboprop. The battery specific energy would need to reach 1000 watt-hours per kilogram by 2030 to make the electrification of its propulsion an economically feasible option. A shorter range and/or an altered propulsion-airframe integration could provide more favorable results.

  18. Multicriteria Analysis for universalization of electricity services in isolated rural households in the region Norte Fluminense

    Directory of Open Access Journals (Sweden)

    Luiz Mendes

    2015-02-01

    Full Text Available Besides hydropower Brazil has considerable potential wind and solar that can contribute to the universalization of electricity services in remote communities. This is because the program “Luz para todos” has a high cost to the wild places and thus, the universal becomes uneconomical. In the present study, we used the AHP method classic and Borda for multicriteria problems with the objective of choosing the type of supply electricity to an isolated rural domicile with average consumption of 150kWh of electricity and located in the northern region of Rio de Janeiro. For this, we considered four alternatives based on quantitative and qualitative criteria and modeled in six different situations, which are corresponding to distances from houses to the mains conventional dealership. We performed the modeling of the problem with the AHP to select the best source of energy supply, then immediately applied the Borda method for ranking of alternative sources of energy supply, and finally, we propose a new methodology for integration of AHP method to the Borda. Thus, the application of the two methods separately and also the new proposal of integration of these showed similar results as the best alternative for the supply of electricity to the rural domicile isolated situations in the six proposals. Since the supply of conventional dealership was the best alternative for zero distance 500 meters (cases one and two for both methods applied, but for other situations renewables become viable in relation to the grid the concessionaire. Worked so pointed that the greater the distance from houses to the grid, the greater the viability of renewable energy. Furthermore, the results show that renewables can contribute to meeting the demand for electricity in isolated communities and also point to the need to review the policies of universal electrical services in view of the potential wind and solar to be explored in Northern region of the state of Rio de

  19. Possibilities for Estimating Horizontal Electrical Currents in Active Regions on the Sun

    Science.gov (United States)

    Fursyak, Yu. A.; Abramenko, V. I.

    2017-12-01

    Part of the "free" magnetic energy associated with electrical current systems in the active region (AR) is released during solar flares. This proposition is widely accepted and it has stimulated interest in detecting electrical currents in active regions. The vertical component of an electric current in the photosphere can be found by observing the transverse magnetic field. At present, however, there are no direct methods for calculating transverse electric currents based on these observations. These calculations require information on the field vector measured simultaneously at several levels in the photosphere, which has not yet been done with solar instrumentation. In this paper we examine an approach to calculating the structure of the square of the density of a transverse electrical current based on a magnetogram of the vertical component of the magnetic field in the AR. Data obtained with the Helioseismic and Magnetic Imager (HMI) on board the Solar Dynamic Observatory (SDO) for the AR of NOAA AR 11283 are used. It is shown that (1) the observed variations in the magnetic field of a sunspot and the proposed estimate of the density of an annular horizontal current around the spot are consistent with Faraday's law and (2) the resulting estimates of the magnitude of the square of the density of the horizontal current {j}_{\\perp}^2 = (0.002- 0.004) A2/m4 are consistent with previously obtained values of the density of a vertical current in the photosphere. Thus, the proposed estimate is physically significant and this method can be used to estimate the density and structure of transverse electrical currents in the photosphere.

  20. Distributional impacts of state-level energy efficiency policies in regional electricity markets

    International Nuclear Information System (INIS)

    Sahraei-Ardakani, Mostafa; Blumsack, Seth; Kleit, Andrew

    2012-01-01

    A number of U.S. states have passed legislation targeting energy efficiency and peak demand reduction. We study one such state, Pennsylvania, within the context of PJM, a regional electricity market covering numerous different states. Our focus is on the distributive impacts of this policy—specifically how the policy is likely to impact electricity prices in different areas of Pennsylvania and in the PJM market more generally. Such spatial differences in policy impacts are difficult to model and the transmission system is often ignored in policy studies. Our model estimates supply curves on a “zonal” basis within regional electricity markets and yields information on price and fuel utilization within each zone. We use the zonal supply curves estimated by our model to study regional impacts of energy-efficiency legislation on utilities both inside and outside of Pennsylvania. For most utilities in Pennsylvania, it would reduce the influence of natural gas on electricity price formation and increase the influence of coal. It would also save 2.1 to 2.8 percent of total energy cost in Pennsylvania in a year similar to 2009. The savings are lower than 0.5 percent in other PJM states and the prices may slightly increase in Washington, DC area. - Highlights: ► We model distributional impacts of energy efficiency and conservation policies. ► We use our model to study the impacts of Pennsylvania act 129. ► We estimate $235 million in annual savings for PA and $275 million for PJM. ► The prices decrease in most of the zones but the impacts are not uniform. ► The influence of coal on electricity prices increases relative to natural gas.

  1. Electrical conductivity and ion diffusion in porcine meniscus: effects of strain, anisotropy, and tissue region.

    Science.gov (United States)

    Kleinhans, Kelsey L; McMahan, Jeffrey B; Jackson, Alicia R

    2016-09-06

    The purpose of the present study was to investigate the effects of mechanical strain, anisotropy, and tissue region on electrical conductivity and ion diffusivity in meniscus fibrocartilage. A one-dimensional, 4-wire conductivity experiment was employed to measure the electrical conductivity in porcine meniscus tissues from two tissue regions (horn and central), for two tissue orientations (axial and circumferential), and for three levels of compressive strain (0%, 10%, and 20%). Conductivity values were then used to estimate the relative ion diffusivity in meniscus. The water volume fraction of tissue specimens was determined using a buoyancy method. A total of 135 meniscus samples were measured; electrical conductivity values ranged from 2.47mS/cm to 4.84mS/cm, while relative ion diffusivity was in the range of 0.235 to 0.409. Results show that electrical conductivity and ion diffusion are significantly anisotropic (pmeniscus fibrocartilage, which is essential in developing new strategies to treat and/or prevent tissue degeneration. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Proceedings of the Canadian Institute's 3. annual conference on generation adequacy in Ontario : strategies to increase capacity to ensure a reliable electricity supply in Ontario

    International Nuclear Information System (INIS)

    2006-01-01

    This conference provided a forum for the discussion of issues related to generation adequacy in Ontario. Members of the electricity industry as well as members from governmental and non-governmental agencies discussed a variety of recommendations for cost-effective reliable energy in Ontario. Issues related to the overhaul or replacement of nuclear power reactors and coal-fired generators in the province were reviewed. The status of various wind power projects in the province was examined along with issues related to interconnected power systems. Best practices for the planning and execution of electricity infrastructure projects were also reviewed, and issues related to stakeholder involvement in electricity generation projects were discussed. The discussions also described recent developments in electricity generation in various jurisdictions in Canada and the United States. The conference featured 19 presentations, of which 7 have been catalogued separately for inclusion in this database. tabs., figs

  3. Opportunity for inter-regional integration of electricity markets: the case of Shandong and Shanghai in East China

    International Nuclear Information System (INIS)

    Gnansounou, Edgard; Dong Jun

    2004-01-01

    In this paper, the opportunity for the inter-regional integration of the electricity market in East China is analysed on the basis of strategies for the future expansion of the electricity generation system. We assume that during its first stage, the operational breakthrough of the electricity sector reform in China will be to achieve an economic dispatch of the generating plants. On the basis of this assumed goal a multi-region model is proposed to appraise the potential benefits of an integrated inter-regional electricity market. This model includes: propositions on design and operation of the market, electricity demand forecasting, least-cost generating system expansion. As case study, three strategies of electricity supply are assessed in two provinces: Shandong and Shanghai in East China. While Shandong is a potential electricity exporter due to availability of primary energy resources, Shanghai is an electricity importer. The strategies include: autarkical expansion of each regional system, import/export only for minimizing operation costs, integration of the system expansion for minimizing total costs including operation and investment costs. One of the findings is that building up an inter-regional integrated electricity market is profitable for both the Shanghai and Shandong regions compared with the two other strategies, if the future regulation makes it possible to insure an economic dispatch of the generating power plants

  4. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    Energy Technology Data Exchange (ETDEWEB)

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  5. Effect of Heat and Electricity Storage and Reliability on Microgrid Viability:A Study of Commercial Buildings in California and New York States

    Energy Technology Data Exchange (ETDEWEB)

    Stadler, Michael; Marnay, Chris; Siddiqui, Afzal; Lai, Judy; Coffey, Brian; Aki, Hirohisa

    2008-12-01

    In past work, Berkeley Lab has developed the Distributed Energy Resources Customer Adoption Model (DER-CAM). Given end-use energy details for a facility, a description of its economic environment and a menu of available equipment, DER-CAM finds the optimal investment portfolio and its operating schedule which together minimize the cost of meeting site service, e.g., cooling, heating, requirements. Past studies have considered combined heat and power (CHP) technologies. Methods and software have been developed to solve this problem, finding optimal solutions which take simultaneity into account. This project aims to extend on those prior capabilities in two key dimensions. In this research storage technologies have been added as well as power quality and reliability (PQR) features that provide the ability to value the additional indirect reliability benefit derived from Consortium for Electricity Reliability Technology Solutions (CERTS) Microgrid capability. This project is intended to determine how attractive on-site generation becomes to a medium-sized commercial site if economical storage (both electrical and thermal), CHP opportunities, and PQR benefits are provided in addition to avoiding electricity purchases. On-site electrical storage, generators, and the ability to seamlessly connect and disconnect from utility service would provide the facility with ride-through capability for minor grid disturbances. Three building types in both California and New York are assumed to have a share of their sensitive electrical load separable. Providing enhanced service to this load fraction has an unknown value to the facility, which is estimated analytically. In summary, this project began with 3 major goals: (1) to conduct detailed analysis to find the optimal equipment combination for microgrids at a few promising commercial building hosts in the two favorable markets of California and New York; (2) to extend the analysis capability of DER-CAM to include both heat and

  6. Innovative protection and control systems for a reliable and secure operation of electrical transmission systems; Innovative Schutz- und Leitsysteme zur zuverlaessigen und sicheren elektrischen Energieuebertragung

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, Sven C.; Kubis, Adreas; Rehtanz, Christian [Technische Univ. Dortmund (Germany). Inst. fuer Energiesysteme, Energieeffizienz und Energiewirtschaft (ie3); Brato, Sebastian; Goetze, Juergen [Technische Univ. Dortmund (Germany). Arbeitsgebiet Datentechnik

    2012-07-01

    The integration of European electricity markets as well as the increasing power feed-in by renewable energy sources pose new challenges to the operation of electrical transmission systems. Modern protection and control systems based on wide-area information can substantially contribute to a reliable and secure system operation even against the background of future demands. In this paper research advances regarding new applications for wide-area monitoring, protection and control as well as an integrated simulation for power and ICT systems are presented that have been developed in the course of DFG research unit FOR1511 at TU Dortmund. (orig.)

  7. Telecommunications and the Travel Industry: Impacts on National and Regional Development. Papers Presented at the Mid-Year Seminar of the Pacific Telecommunications Council (Bali, Indonesia, May 1991).

    Science.gov (United States)

    Harms, L. S., Ed.

    This report of the Mid-Year Seminar of the Pacific Telecommunications Council (PTC) conference contains papers focusing on the use of telecommunications in the travel and tourism industries. After the message of welcome, opening remarks, and comments on the seminar, papers are divided and listed in five categories. First is The Indonesian Case:…

  8. National Safety Council

    Science.gov (United States)

    ... work, in homes and communities, and on the road through leadership, research, education and advocacy. NSC Newsletter Sign up for our newsletter! Like Us on Facebook National Safety Council © National Safety Council. All rights reserved. Contact ...

  9. APA Council Reports.

    Science.gov (United States)

    2017-10-01

    At the fall component meetings of the American Psychiatric Association in Arlington, Va., September 13-16, 2017, the APA councils heard reports from their components. Following are summaries of the activities of the councils and their components.

  10. Assessment of the reliability of standard automated perimetry in regions of glaucomatous damage.

    Science.gov (United States)

    Gardiner, Stuart K; Swanson, William H; Goren, Deborah; Mansberger, Steven L; Demirel, Shaban

    2014-07-01

    Visual field testing uses high-contrast stimuli in areas of severe visual field loss. However, retinal ganglion cells saturate with high-contrast stimuli, suggesting that the probability of detecting perimetric stimuli may not increase indefinitely as contrast increases. Driven by this concept, this study examines the lower limit of perimetric sensitivity for reliable testing by standard automated perimetry. Evaluation of a diagnostic test. A total of 34 participants with moderate to severe glaucoma; mean deviation at their last clinic visit averaged -10.90 dB (range, -20.94 to -3.38 dB). A total of 75 of the 136 locations tested had a perimetric sensitivity of ≤ 19 dB. Frequency-of-seeing curves were constructed at 4 nonadjacent visual field locations by the Method of Constant Stimuli (MOCS), using 35 stimulus presentations at each of 7 contrasts. Locations were chosen a priori and included at least 2 with glaucomatous damage but a sensitivity of ≥ 6 dB. Cumulative Gaussian curves were fit to the data, first assuming a 5% false-negative rate and subsequently allowing the asymptotic maximum response probability to be a free parameter. The strength of the relation (R(2)) between perimetric sensitivity (mean of last 2 clinic visits) and MOCS sensitivity (from the experiment) for all locations with perimetric sensitivity within ± 4 dB of each selected value, at 0.5 dB intervals. Bins centered at sensitivities ≥ 19 dB always had R(2) >0.1. All bins centered at sensitivities ≤ 15 dB had R(2) <0.1, an indication that sensitivities are unreliable. No consistent conclusions could be drawn between 15 and 19 dB. At 57 of the 81 locations with perimetric sensitivity <19 dB, including 49 of the 63 locations ≤ 15 dB, the fitted asymptotic maximum response probability was <80%, consistent with the hypothesis of response saturation. At 29 of these locations the asymptotic maximum was <50%, and so contrast sensitivity (50% response rate) is undefined. Clinical

  11. A case study review of technical and technology issues for transition of a utility load management program to provide system reliability resources in restructured electricity markets

    Energy Technology Data Exchange (ETDEWEB)

    Weller, G.H.

    2001-07-15

    Utility load management programs--including direct load control and interruptible load programs--were employed by utilities in the past as system reliability resources. With electricity industry restructuring, the context for these programs has changed; the market that was once controlled by vertically integrated utilities has become competitive, raising the question: can existing load management programs be modified so that they can effectively participate in competitive energy markets? In the short run, modified and/or improved operation of load management programs may be the most effective form of demand-side response available to the electricity system today. However, in light of recent technological advances in metering, communication, and load control, utility load management programs must be carefully reviewed in order to determine appropriate investments to support this transition. This report investigates the feasibility of and options for modifying an existing utility load management system so that it might provide reliability services (i.e. ancillary services) in the competitive markets that have resulted from electricity industry restructuring. The report is a case study of Southern California Edison's (SCE) load management programs. SCE was chosen because it operates one of the largest load management programs in the country and it operates them within a competitive wholesale electricity market. The report describes a wide range of existing and soon-to-be-available communication, control, and metering technologies that could be used to facilitate the evolution of SCE's load management programs and systems to provision of reliability services. The fundamental finding of this report is that, with modifications, SCE's load management infrastructure could be transitioned to provide critical ancillary services in competitive electricity markets, employing currently or soon-to-be available load control technologies.

  12. Day-Ahead Energy Planning with 100% Electric Vehicle Penetration in the Nordic Region by 2050

    Directory of Open Access Journals (Sweden)

    Zhaoxi Liu

    2014-03-01

    Full Text Available This paper presents the day-ahead energy planning of passenger cars with 100% electric vehicle (EV penetration in the Nordic region by 2050. EVs will play an important role in the future energy systems which can both reduce the greenhouse gas (GHG emissions from the transport sector and provide the demand side flexibility required by smart grids. On the other hand, the EVs will increase the electricity consumption. In order to quantify the electricity consumption increase due to the 100% EV penetration in the Nordic region to facilitate the power system planning studies, the day-ahead energy planning of EVs has been investigated with different EV charging scenarios. Five EV charging scenarios have been considered in the energy planning analysis which are: uncontrolled charging all day, uncontrolled charging at home, timed charging, spot price based charging all day and spot price based charging at home. The demand profiles of the five charging analysis show that timed charging is the least favorable charging option and the spot priced based EV charging might induce high peak demands. The EV charging demand will have a considerable share of the energy consumption in the future Nordic power system.

  13. Regional differences in electricity distribution costs and their consequences for yardstick regulation of access prices

    International Nuclear Information System (INIS)

    Filippini, M.; Wild, J.

    2001-01-01

    In this paper we estimate an average-cost function for a panel of 59 Swiss local and regional electricity distribution utilities as a basis for yardstick regulation of the distribution-network access prices. Shleifer (1985) proposed yardstick competition in terms of price to regulate local monopolies producing a homogeneous good. The regulated price for the individual firms depends on the average costs of identical firms. The yardstick competition concept can also be applied to firms that produce heterogeneous goods if these goods differ only in observable characteristics. To correct the yardstick for heterogeneity the regulator can use a multivariate estimation of an average-cost function. In the case of electricity distribution, the heterogeneity of output consists mainly of different characteristics of the distribution service areas. In this paper we follow Shleifer's suggestion to estimate a multivariate average-cost function that can be employed by the regulatory commission to benchmark network access prices at the distribution level. Several exogenous variables measuring the heterogeneity of the service areas were included in the cost model specification. We find that the regional differences of the service areas - e.g. area shares of forests, agricultural areas or unproductive land and population density - significantly influence electricity distribution costs

  14. 76 FR 2672 - Caribbean Fishery Management Council; Public Meeting

    Science.gov (United States)

    2011-01-14

    ... Caribbean Fishery Management Council (Council) in partnership with the Fisheries Leadership and... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National... Management of Data Poor Stocks.'' The intent of this workshop is to discuss tools that the region may find...

  15. 77 FR 50472 - New England Fishery Management Council; Public Meeting

    Science.gov (United States)

    2012-08-21

    ... Region Logbook Family of Forms Federal Register (77 FR 153, 8/8/12). Other business may be discussed. The... Fishery Management Council; Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National... England Fishery Management Council's (Council) VMS/ Enforcement Committee and Advisory Panel will meet to...

  16. Insights from Synthetic Star-forming Regions. I. Reliable Mock Observations from SPH Simulations

    Energy Technology Data Exchange (ETDEWEB)

    Koepferl, Christine M.; Robitaille, Thomas P.; Biscani, Francesco [Max Planck Institute for Astronomy, Königstuhl 17, D-69117 Heidelberg (Germany); Dale, James E., E-mail: koepferl@usm.lmu.de [University Observatory Munich, Scheinerstr. 1, D-81679 Munich (Germany)

    2017-11-01

    Through synthetic observations of a hydrodynamical simulation of an evolving star-forming region, we assess how the choice of observational techniques affects the measurements of properties that trace star formation. Testing and calibrating observational measurements requires synthetic observations that are as realistic as possible. In this part of the series (Paper I), we explore different techniques for mapping the distributions of densities and temperatures from the particle-based simulations onto a Voronoi mesh suitable for radiative transfer and consequently explore their accuracy. We further test different ways to set up the radiative transfer in order to produce realistic synthetic observations. We give a detailed description of all methods and ultimately recommend techniques. We have found that the flux around 20 μ m is strongly overestimated when blindly coupling the dust radiative transfer temperature with the hydrodynamical gas temperature. We find that when instead assuming a constant background dust temperature in addition to the radiative transfer heating, the recovered flux is consistent with actual observations. We present around 5800 realistic synthetic observations for Spitzer and Herschel bands, at different evolutionary time-steps, distances, and orientations. In the upcoming papers of this series (Papers II, III, and IV), we will test and calibrate measurements of the star formation rate, gas mass, and the star formation efficiency using our realistic synthetic observations.

  17. Degree of Fault Tolerance as a Comprehensive Parameter for Reliability Evaluation of Fault Tolerant Electric Traction Drives

    Directory of Open Access Journals (Sweden)

    Igor Bolvashenkov

    2016-09-01

    Full Text Available This paper describes a new approach and methodology of quantitative assessment of the fault tolerance of electric power drive consisting of the multi-phase traction electric motor and multilevel electric inverter. It is suggested to consider such traction drive as a system with several degraded states. As a comprehensive parameter for evaluating of the fault tolerance, it is proposed to use the criterion of degree of the fault tolerance. For the approbation of the proposed method, the authors carried out research and obtained results of its practical application for evaluating the fault tolerance of the power train of an electrical helicopter.

  18. Driving pattern analysis of Nordic region based on the national travel surveys for electric vehicle integration

    DEFF Research Database (Denmark)

    Liu, Zhaoxi; Wu, Qiuwei; Christensen, Linda

    2015-01-01

    to the power system. This paper presents a methodology to transform driving behavior of persons into the one of cars in order to analyze the driving pattern of electric vehicles (EVs) based on the National Travel Surveys. In the proposed methodology, a statistical process is used to obtain the driving behavior......EVs show great potential to cope with the intermittency of renewable energy sources (RES) and provide demand side flexibility required by the smart grid.On the other hand, the EVs will increase the electricity consumption. Large scale integration of EVs will probably have substantial impacts...... of cars by grouping the survey respondents according to the driving license number and car number and mapping the households with similar characteristics. The proposed methodology was used to carry out the driving pattern analysis in the Nordic region. The detailed driving requirements and the charging...

  19. Final Report to the National Energy Technology Laboratory on FY14- FY15 Cooperative Research with the Consortium for Electric Reliability Technology Solutions

    Energy Technology Data Exchange (ETDEWEB)

    Vittal, Vijay [Arizona State Univ., Tempe, AZ (United States); Lampis, Anna Rosa [Arizona State Univ., Tempe, AZ (United States)

    2018-01-16

    The Power System Engineering Research Center (PSERC) engages in technological, market, and policy research for an efficient, secure, resilient, adaptable, and economic U.S. electric power system. PSERC, as a founding partner of the Consortium for Electric Reliability Technology Solutions (CERTS), conducted a multi-year program of research for U.S. Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) to develop new methods, tools, and technologies to protect and enhance the reliability and efficiency of the U.S. electric power system as competitive electricity market structures evolve, and as the grid moves toward wide-scale use of decentralized generation (such as renewable energy sources) and demand-response programs. Phase I of OE’s funding for PSERC, under cooperative agreement DE-FC26-09NT43321, started in fiscal year (FY) 2009 and ended in FY2013. It was administered by DOE’s National Energy Technology Laboratory (NETL) through a cooperative agreement with Arizona State University (ASU). ASU provided sub-awards to the participating PSERC universities. This document is PSERC’s final report to NETL on the activities for OE, conducted through CERTS, from September 2015 through September 2017 utilizing FY 2014 to FY 2015 funding under cooperative agreement DE-OE0000670. PSERC is a thirteen-university consortium with over 30 industry members. Since 1996, PSERC has been engaged in research and education efforts with the mission of “empowering minds to engineer the future electric energy system.” Its work is focused on achieving: • An efficient, secure, resilient, adaptable, and economic electric power infrastructure serving society • A new generation of educated technical professionals in electric power • Knowledgeable decision-makers on critical energy policy issues • Sustained, quality university programs in electric power engineering. PSERC core research is funded by industry, with a budget supporting

  20. Regional electric power demand elasticities of Japan's industrial and commercial sectors

    International Nuclear Information System (INIS)

    Hosoe, Nobuhiro; Akiyama, Shu-ichi

    2009-01-01

    In the assessment and review of regulatory reforms in the electric power market, price elasticity is one of the most important parameters that characterize the market. However, price elasticity has seldom been estimated in Japan; instead, it has been assumed to be as small as 0.1 or 0 without proper examination of the empirical validity of such a priori assumptions. We estimated the regional power demand functions for nine regions, in order to quantify the elasticity, and found the short-run price elasticity to be 0.09-0.30 and the long-run price elasticity to be 0.12-0.56. Inter-regional comparison of our estimation results suggests that price elasticity in rural regions is larger than that in urban regions. Popular assumptions of small elasticity of 0.1, for example, could be suitable for examining Japan's aggregate power demand but not power demand functions that focus on respective regions. Furthermore, assumptions about smaller elasticity values such as 0.01 and 0 could not be supported statistically by this study.

  1. Regional electric power demand elasticities of Japan's industrial and commercial sectors

    Energy Technology Data Exchange (ETDEWEB)

    Hosoe, Nobuhiro [National Graduate Institute for Policy Studies, 7-22-1 Roppongi, Minato, Tokyo 106-8677 (Japan); Akiyama, Shu-ichi [Kushiro Public University of Economics, 4-1-1 Ashino, Kushiro, Hokkaido 085-8585 (Japan)

    2009-11-15

    In the assessment and review of regulatory reforms in the electric power market, price elasticity is one of the most important parameters that characterize the market. However, price elasticity has seldom been estimated in Japan; instead, it has been assumed to be as small as 0.1 or 0 without proper examination of the empirical validity of such a priori assumptions. We estimated the regional power demand functions for nine regions, in order to quantify the elasticity, and found the short-run price elasticity to be 0.09-0.30 and the long-run price elasticity to be 0.12-0.56. Inter-regional comparison of our estimation results suggests that price elasticity in rural regions is larger than that in urban regions. Popular assumptions of small elasticity of 0.1, for example, could be suitable for examining Japan's aggregate power demand but not power demand functions that focus on respective regions. Furthermore, assumptions about smaller elasticity values such as 0.01 and 0 could not be supported statistically by this study. (author)

  2. Co-existence of electricity, TEP, and TGC markets in the Baltic Sea Region

    International Nuclear Information System (INIS)

    Hindsberger, Magnus; Nybroe, Malene Hein; Ravn, Hans F.; Schmidt, Rune

    2003-01-01

    This paper analyses the application of two policy instruments, tradable emission permits (TEPs) and tradable green certificates (TGCs) to the electricity sector in an international context. The paper contains an explicit modelling at two levels of abstraction, one suitable for defining and analysing basic functionalities and one suitable for numerical analysis in relation to countries in the Baltic Sea Region. Emphasis is on estimating implications in quantitative terms for countries in the Baltic Sea Region in 2010 when the TEP market in the analysis extends to four Nordic countries (Denmark, Finland, Norway, Sweden), and the TGC market extends to North European EU countries (Denmark, Finland, Sweden, Germany). The study concludes that within the range of goals stipulated in the EU draft directive (23.6% renewable energy) and the Kyoto targets for emissions, the following prices are affected significantly: from -2 to +10 Euro/MWh for electricity spot prices, TGC prices up to 50 Euro/MWh, TEP prices up to 18 Euro/t CO 2 and up to +15 Euro/MWh on the consumer cost. It is shown that such price changes have important consequences for the production and investment patterns in the electricity sector, and the resulting patterns will be clearly different according to the specific numerical targets for the two goals. An immediate consequence is increased pressure on transmission lines. Further, the introduction of TEP and TGC markets will imply a restructuring of the electricity sector, e.g. (depending on the specific combination of targets) by a significant increase in wind power capacities. However, this will have to be counterbalanced by access to production technologies that have fast regulation properties and/or that may maintain voltage stability. However, the price signals of TGCs (and to some extent also TEPs) that will enhance wind power investments will simultaneously hamper investments in technologies that are a precondition for extensive use of wind power

  3. Electric energy cooperation in the Baltic Sea region and the role of Russia in it

    Directory of Open Access Journals (Sweden)

    Zverev Yuri

    2013-06-01

    Full Text Available This article examines cooperation in the electric energy sector in the Baltic region. The author explores the existing undersea HVDC power exchange projects. It is emphasised that cooperation in the electric energy sector is concentrated largely in the EU member states despite earlier plans to establish the Baltic energy ring, which would also include Russia and Belarus. The author stresses that one of the most acute problems for the EU today is overcoming isolation of the energy systems of the Baltic States (Lithuania, Latvia, and Estonia from that of the major part of the EU. This task has become especially relevant after the closing of the Ignalina NPP (Lithuania, which used to be the primary energy source for the three Baltic States. The article examines key projects of the construction of new international power transmission lines in the framework of the Baltic Energy Market Interconnection Plan (BEMIP and the prospects of the Visaginas NPP (Lithuania in solving energy problems of the Baltic States. The author analyses Russia’s role in the electric energy market and focuses on a possible increase of the country’s energy market share following the construction of the Baltic NPP and the export of generated electric energy to Poland, Lithuania, Germany, and Sweden. The author concludes that the prospects of Russia’s energy export to the Baltic Sea region will be determined not only by technological, economic and market factors, but rather by the general state of relations between Russia and the EU. Moreover, a lot depends on Lithuania’s decision on the construction of the Visaginas NPP, as well as the way the EU and the Baltic States solve the problem of energy supply in case the NPP project is terminated.

  4. Studies of electric dipole moments in the octupole collective regions of heavy Radiums and Bariums

    CERN Multimedia

    Hoff, P; Kaczarowski, R

    2002-01-01

    %IS386 %title\\ \\It is proposed to study the electric dipole moments in the regions of octupole collective Ra-Th and Ba-Ce nuclei by means of Advanced Time-Delayed (ATD) $\\beta\\gamma\\gamma(t)$ method with a primary goal to provide new and critical data on the properties of E1 moments. The proposal focuses on the nuclei of $^{225,226,229}$Ra, $^{229,233}$Th and $^{149,150}$Ba.\\ \\The ATD $\\beta\\gamma\\gamma$(t) method was first tested at ISOLDE as part of the IS322 study of Fr-Ra nuclei at the limits of octupole deformation region. The results have greatly increased the knowledge of electric dipole moments in the region and demonstrated that new and unique research capabilities in this field are now available at ISOLDE. Based on the experience and new systematics, we propose a specialized study with the aim to determine the missing key aspects of the E1 moment systematics. We propose : \\begin{enumerate}[a)] \\item to measure the lifetimes of the 1$_{1}^{-}$ and 3$_{1}^{-}$ states in $^{226}$Ra with $\\sim$15\\% prec...

  5. Determination of wind energy potential and its implementation concept for the electricity market in the Vojvodina region (north Serbia: An overview

    Directory of Open Access Journals (Sweden)

    Micić Tanja

    2014-01-01

    Full Text Available Renewable energy sources play an important role in the future not only for the European countries, but for many countries worldwide. Most cost-effective and reliable large wind energy conversion systems are becoming the main focus of wind energy research and technology development, all in order to make wind energy competitive with other more traditional sources of electrical energy like coal, gas and nuclear generation. Serbia, along with neighboring countries, has a high potential for developing energy production from renewable energy sources. Wind energy in Serbia, despite its great potential, is only partly studied and insufficiently used. This study aims to provide summary of wind energy potentials in the region of Vojvodina, which is an important economic region in northern Serbia. Its existing electrical energy status is thoroughly investigated according to the recent developments of wind energy production on global, regional and local scale. The main purpose of this study is the implementation of energy efficiency concept with purpose of satisfying the needs of Serbian electricity market.

  6. Endorsement obligation of the Federal council for the atomic legally regulated increase in production of the ''residual quantities of electricity'' and the associated lifetime extension of nuclear power plants?; Zustimmungspflicht des Bundesrates fuer die atomgesetzlich zu regelnde Produktionserhoehung der ''Reststrommengen'' und der damit verbundenen Laufzeitverlaengerungen von Kernkraftwerken?

    Energy Technology Data Exchange (ETDEWEB)

    Kotulla, Michael [Bielefeld Univ. (Germany). Lehrstuhl fuer Oeffentliches Recht insbesondere Umweltrecht; Kilic, Ali

    2010-12-15

    The authors of the contribution under consideration report on the problem whether an increase in electricity by nuclear power plants due to a longer residual lifetime require the consent of the Federal Council. The authors show the amazingly unambiguous legal position on the basis of the constitutional law.

  7. Feasibility assessment of a solar-powered charging station for electric vehicles in the North Central region of Bulgaria

    Directory of Open Access Journals (Sweden)

    Ilieva Liliya Mihaylova

    2016-01-01

    Full Text Available The paper discusses the topical issue related to the prospects of widespread deployment of electric vehicles and their associated infrastructure in Bulgaria. The main problems hindering the development of electric vehicle transport are summarized and the current status of charging infrastructure in the country is discussed. An approach is proposed for analysis and evaluation of the financial feasibility of investment in a solar-powered charging station for electric vehicles in North Central region of Bulgaria.

  8. Africa's intra-regional, inter-regional and intercontinental electricity trade - Techno-politico-economic considerations and future prospects

    Energy Technology Data Exchange (ETDEWEB)

    Ram, Babu

    2007-07-01

    The majority of Africa's population does not have access to electricity. The Sub-Saharan African is largely hit save South Africa. Among the many reasons for this situation, the major one is: the insufficient growth of the investment against the demand of electricity. This is to say that the investment has not been able to keep pace with the demand which has been rising with the growing population and with the economic activities. As a result, there is a backlog of investment. To circumvent this situation, 4 billion dollar annual investment is needed in the electricity sector. But the risks and high transaction costs of African economies deter investors and are relatively unable to attract them. Furthermore, a number of African economies are small due to which the benefits of the economy of scale are not realizable. Moreover, isolated and individualistic planning makes countries incur huge investment and makes the supply of electricity to disadvantaged areas even costlier. The supply costs can be reduced by invoking meticulously to coordinated combined planning and regional integration. New Partnership for Africa's Development (NEPAD) advocates a development paradigm based on the principles of interdependence, cooperation, and regional integration. However, the absence of infrastructure and institutions and harmonized policies obstruct the integration of electricity supply systems. Creating regional electricity markets is a way to reduce risks and transaction costs and to lure investors to develop much needed electricity generation and transmission facilities for increasing electricity access in rural areas. This paper extends the themes of regional integration to establishing the regional electricity markets/power pools. It considers the intra-regional and inter-regional electricity trade in Africa. It also considers Africa's inter-continental trade that is its trade with Europe and Asia. This paper examines technical constraints, proposes solutions

  9. Electricity

    CERN Document Server

    Basford, Leslie

    2013-01-01

    Electricity Made Simple covers the fundamental principles underlying every aspect of electricity. The book discusses current; resistance including its measurement, Kirchhoff's laws, and resistors; electroheat, electromagnetics and electrochemistry; and the motor and generator effects of electromagnetic forces. The text also describes alternating current, circuits and inductors, alternating current circuits, and a.c. generators and motors. Other methods of generating electromagnetic forces are also considered. The book is useful for electrical engineering students.

  10. Role Of E-Government In Delivery Of Public Services In Tanzania Electric Supply Company In Ruvuma Region Tanzania

    Directory of Open Access Journals (Sweden)

    Emmanuel Jackson Petro Gunda

    2015-06-01

    Full Text Available ABSTRACT E-government facilitates delivery of public services of relevant government information in electronic form to citizens in a timely manner and better service delivery to citizens. E-government is a kind of governmental administration which is based on Information Communication and Technology Services. Electronic government describes the use of technologies to facilitate the operation of government and disperse of government information and services. The scope of the work was limited to Tanzania Electric Supply Company Limited TANESCO in Ruvuma region. The population of thirty 31 were selected from a total population of 169 public servants use both purposive and stratified random sampling techniques applied. The major findings of study revealed that about 67.7 of response from respondents agree that ICT infrastructures specifically modern computer connected to internet reliable internet speed well organized organization website power availability in public operation contribute to efficient in delivery of services it also noted by respondents to faster decision making speeding up transaction processing and reduce cost. The study greatly recommends that capacity building to public servants on ICT install and strengthening ICT infrastructures to government organizational are inevitable to realise relevant role of e-government in delivery of public services.

  11. Assessing the effects of data selection and representation on the development of reliable E. coli sigma 70 promoter region predictors.

    Directory of Open Access Journals (Sweden)

    Mostafa M Abbas

    Full Text Available As the number of sequenced bacterial genomes increases, the need for rapid and reliable tools for the annotation of functional elements (e.g., transcriptional regulatory elements becomes more desirable. Promoters are the key regulatory elements, which recruit the transcriptional machinery through binding to a variety of regulatory proteins (known as sigma factors. The identification of the promoter regions is very challenging because these regions do not adhere to specific sequence patterns or motifs and are difficult to determine experimentally. Machine learning represents a promising and cost-effective approach for computational identification of prokaryotic promoter regions. However, the quality of the predictors depends on several factors including: i training data; ii data representation; iii classification algorithms; iv evaluation procedures. In this work, we create several variants of E. coli promoter data sets and utilize them to experimentally examine the effect of these factors on the predictive performance of E. coli σ70 promoter models. Our results suggest that under some combinations of the first three criteria, a prediction model might perform very well on cross-validation experiments while its performance on independent test data is drastically very poor. This emphasizes the importance of evaluating promoter region predictors using independent test data, which corrects for the over-optimistic performance that might be estimated using the cross-validation procedure. Our analysis of the tested models shows that good prediction models often perform well despite how the non-promoter data was obtained. On the other hand, poor prediction models seems to be more sensitive to the choice of non-promoter sequences. Interestingly, the best performing sequence-based classifiers outperform the best performing structure-based classifiers on both cross-validation and independent test performance evaluation experiments. Finally, we propose a

  12. Electric potential structures of auroral acceleration region border from multi-spacecraft Cluster data

    Science.gov (United States)

    Sadeghi, S.; Emami, M. R.

    2018-04-01

    This paper studies an auroral event using data from three spacecraft of the Cluster mission, one inside and two at the poleward edge of the bottom of the Auroral Acceleration Region (AAR). The study reveals the three-dimensional profile of the region's poleward boundary, showing spatial segmentation of the electric potential structures and their decay in time. It also depicts localized magnetic field variations and field-aligned currents that appear to have remained stable for at least 80 s. Such observations became possible due to the fortuitous motion of the three spacecraft nearly parallel to each other and tangential to the AAR edge, so that the differences and variations can be seen when the spacecraft enter and exit the segmentations, hence revealing their position with respect to the AAR.

  13. Simulation of a DC electric arc furnace for steelmaking: study in the arc and bath regions

    International Nuclear Information System (INIS)

    Ramirez Argaez, M. A.; Trapaga Martinez, L. G.

    2001-01-01

    A mathematical model was developed to describe fluid flow, heat transfer, and electromagnetic phenomena in the arc and bath regions of DC electric Arc Furnaces (DC-EAF). The model is used to examine the effect on flow patterns and temperature distribution in the bath, under the influence of both an arc and bottom argon injection in steel or steel/slag systems. Validation of the model employed experimental measurements from systems physically related to DC-EAF from literature. For the conditions analyzed, electromagnetic forces dominate the fluid motion in the bath. Buoyancy and shear forces from the arc have a negligible effect in driving the flow; however, they partially counteract the electromagnetic forces. Slag decreases fluid motion in the steel and enhances temperature stratification in the system. Stirring of the bath, using a 3-nozzle inert gas injection system, is found to promote temperature uniformity in the regions near the lateral wall of the furnace. (Author) 24 refs

  14. The Electricity Feed Law levy - how reliably can it be predicted?; Wie verlaesslich laesst sich die EEG-Umlage prognostizieren?

    Energy Technology Data Exchange (ETDEWEB)

    Bause, Rainer; Schulz, Woldemar [Amprion GmbH, Dortmund (Germany); Buehler, Holger [EnBW TNG, Stuttgart (Germany); Hodurek, Claus [50Hertz Transmission GmbH, Berlin (Germany); Kiessling, Axel [TenneT TSO GmbH, Bayreuth (Germany)

    2011-10-15

    By paying their monthly electricity bill German consumers are promoting the transition to tomorrow's resource-efficient electricity supply system, in which the largest part of electricity used is to come from renewable energy resources. Every year Germany's transmission system operators publish what is referred to as the ''EEG-Umlage'' (report on the Electricity Feed Law levy, or EEG levy), which shows how much every German household will be paying for the promotion of renewable energies in the coming year. The determination of the EEG levy involves uncertainties and imponderabilities which have to be taken into account in its calculation. The crucial task is to find a suitable systematic scheme for predicting the renewable energy yield.

  15. The price of electric power in EU region decreased in 1998

    International Nuclear Information System (INIS)

    Kolttola, L.

    2000-01-01

    The price of both household and industrial electric power decreased in EU region during 1998. The price of industrial power decreased by more than 3% and that of households by 0.5%. According to the Eurostat the price of industrial power decreased most in Germany and in Lisbon in Portugal. In the statistics Germany has been divided into several sub-areas. In most of these areas the price decrease was more than 10%. The price of the electric power increased e.g. in London and Birmingham in UK. The price of the electric power consumed by households decreased significantly in Athens (Greece), in Finland and Portugal, and they increased most in the Netherlands and in Leipzig in Germany. The price of industrial electric power is cheapest in Sweden being only about 0.21 FIM (0.035) per kWh, and in Finland the price in the beginning of 1999 was 0.26 FIM (0.0431) per kWh. The price of industrial electric power was highest in Germany and Italy. VAT is not included in the prices used in the survey of industrial electric power. The power consumption of the plants used in the comparison is 2.0 million kWh, the maximum power 500 kW and the maximum operation time 4000 h/a. The price of electric power for households in Greece, there it is cheapest, was under 0.4 FIM (0.07) per kWh. The data of Greece is collected from Athens. In Finland the price of domestic power was second lowest, being less than 0.5 FIM/kWh. The prices in Italy and Denmark were highest in the EU region. The households selected to the survey use 3500 kWh of power annually, 1300 kWh of which is consumed in the night. All the taxes, also VAT, have been included in the price. In 1998 half of the power (52%) was generated by traditional thermal power. The share of nuclear power was 34% and that of hydroelectric power and others 14%. The others group include also the wind power. In 1998 the consumption of thermal power increased by 5%, as well as the consumption of hydroelectric power and other, while the generation

  16. The effects of regional insolation differences upon advanced solar thermal electric power plant performance and energy costs

    Science.gov (United States)

    Latta, A. F.; Bowyer, J. M.; Fujita, T.

    1979-01-01

    This paper presents the performance and cost of four 10-MWe advanced solar thermal electric power plants sited in various regions of the continental United States. Each region has different insolation characteristics which result in varying collector field areas, plant performance, capital costs, and energy costs. The paraboloidal dish, central receiver, cylindrical parabolic trough, and compound parabolic concentrator (CPC) comprise the advanced concepts studied. This paper contains a discussion of the regional insolation data base, a description of the solar systems' performances and costs, and a presentation of a range for the forecast cost of conventional electricity by region and nationally over the next several decades.

  17. Section 4: National Research Council

    International Nuclear Information System (INIS)

    Arseneau, R.; Zelle, J.

    1991-01-01

    A study was carried out to produce a compendium of electric and magnetic field levels in various environments throughout Canada. The contribution of the National Research Council of Canada in cooperation with Ottawa Hydro was to study the magnetic field environment of 29 sites in the Ottawa area, including private residences, place of employment, distribution and transmission lines, and close to padmount transformers. At most sites the electric fields were too low to be measured. Magnetic fields near padmount transformers can be larger than 300 mG, however this rapidly decreases and at 3 feet from the transformers is below 20 mG. Magnetic fields of unbalanced distribution lines can be larger than the fields of balanced lines. The magnetic fields of a high voltage transmission line were measurable at distances up to 100 m from the line. Electric fields were low outside the right-of-way. 6 refs., 4 figs., 2 tabs

  18. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO2 Gate Dielectrics by CF4 Plasma Treatment

    Science.gov (United States)

    Fan, Ching-Lin; Tseng, Fan-Ping; Tseng, Chiao-Yuan

    2018-01-01

    In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs) with a HfO2 gate insulator and CF4 plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO2 gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm2/V∙s (without treatment) to 54.6 cm2/V∙s (with CF4 plasma treatment), which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO2 gate dielectric has also been improved by the CF4 plasma treatment. By applying the CF4 plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device’s immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF4 plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO2 gate dielectric, but also enhances the device’s reliability. PMID:29772767

  19. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO2 Gate Dielectrics by CF4 Plasma Treatment

    Directory of Open Access Journals (Sweden)

    Ching-Lin Fan

    2018-05-01

    Full Text Available In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs with a HfO2 gate insulator and CF4 plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO2 gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm2/V∙s (without treatment to 54.6 cm2/V∙s (with CF4 plasma treatment, which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO2 gate dielectric has also been improved by the CF4 plasma treatment. By applying the CF4 plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device’s immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF4 plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO2 gate dielectric, but also enhances the device’s reliability.

  20. Electrical Performance and Reliability Improvement of Amorphous-Indium-Gallium-Zinc-Oxide Thin-Film Transistors with HfO₂ Gate Dielectrics by CF₄ Plasma Treatment.

    Science.gov (United States)

    Fan, Ching-Lin; Tseng, Fan-Ping; Tseng, Chiao-Yuan

    2018-05-17

    In this work, amorphous indium-gallium-zinc oxide thin-film transistors (a-IGZO TFTs) with a HfO₂ gate insulator and CF₄ plasma treatment was demonstrated for the first time. Through the plasma treatment, both the electrical performance and reliability of the a-IGZO TFT with HfO₂ gate dielectric were improved. The carrier mobility significantly increased by 80.8%, from 30.2 cm²/V∙s (without treatment) to 54.6 cm²/V∙s (with CF₄ plasma treatment), which is due to the incorporated fluorine not only providing an extra electron to the IGZO, but also passivating the interface trap density. In addition, the reliability of the a-IGZO TFT with HfO₂ gate dielectric has also been improved by the CF₄ plasma treatment. By applying the CF₄ plasma treatment to the a-IGZO TFT, the hysteresis effect of the device has been improved and the device's immunity against moisture from the ambient atmosphere has been enhanced. It is believed that the CF₄ plasma treatment not only significantly improves the electrical performance of a-IGZO TFT with HfO₂ gate dielectric, but also enhances the device's reliability.

  1. THE EVOLUTION OF THE ELECTRIC CURRENT DURING THE FORMATION AND ERUPTION OF ACTIVE-REGION FILAMENTS

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jincheng; Yan, Xiaoli; Qu, Zhongquan; Xue, Zhike; Xiang, Yongyuan; Li, Hao, E-mail: egnever@ynao.ac.cn [Yunnan Observatories, Chinese Academy of Sciences, Kunming 650011 (China)

    2016-02-01

    We present a comprehensive study of the electric current related to the formation and eruption of active region filaments in NOAA AR 11884. The vertical current on the solar surface was investigated by using vector magnetograms (VMs) observed by HMI on board the Solar Dynamics Observatory. To obtain the electric current along the filament's axis, we reconstructed the magnetic fields above the photosphere by using nonlinear force-free field extrapolation based on photospheric VMs. Spatio-temporal evolutions of the vertical current on the photospheric surface and the horizontal current along the filament's axis were studied during the long-term evolution and eruption-related period, respectively. The results show that the vertical currents of the entire active region behaved with a decreasing trend and the magnetic fields also kept decreasing during the long-term evolution. For the eruption-related evolution, the mean transverse field strengths decreased before two eruptions and increased sharply after two eruptions in the vicinity of the polarity inversion lines underneath the filament. The related vertical current showed different behaviors in two of the eruptions. On the other hand, a very interesting feature was found: opposite horizontal currents with respect to the current of the filament's axis appeared and increased under the filament before the eruptions and disappeared after the eruptions. We suggest that these opposite currents were carried by the new flux emerging from the photosphere bottom and might be the trigger mechanism for these filament eruptions.

  2. Electric field effects in the night-side subauroral F region

    International Nuclear Information System (INIS)

    Deminov, M.G.; Shubin, V.N.

    1988-01-01

    Theoretical analysis of peculiarities of subauroral ionosphere F-region electron concentration due to magnetospheric substorm electric fields is presented. For this purpose a simple model of electric field was used in which longitudinal current effect on subauroral ionosphere conducting layer is taken into account . This model represents the band of plasma fast western drift near the equatorial boundary of the auroral oval in the night-time sector with plasma leaking into this band both from medium latitudes and from the auroral oval region. In the morning sector the plasma drift rate is sufficiently lower and is oriented mainly to the east. It is shown that in the band of fast western plasma drift F-layer maximum altitude h m grows while N m layer concentration in the maximum drops which is mainly due to the increase of temperature and 0 + ion recombination coefficient. In the morning sector h m practically does not change and N m grows which leads to formation of a step-like structure of N m latitude distribution and to a shift of the main ionospheric gap minimum the equator at the rate of about 80 m/s during the first hours of substorm progress

  3. A busy week for Council

    CERN Multimedia

    2009-01-01

    This has been a busy week for the CERN Council, and there is much to report. Firstly, I’m pleased to say that Council approved the Organization’s Medium Term Plan, and with it the budget for financial year 2010. In a time of global recession, this is a strong vote of confidence from the Member States. This meeting of Council provided an opportunity for the working group on the scientific and geographical enlargement of CERN to set out a roadmap towards its final report, which is to be made at Council’s December session this year. One part of the process over the coming months is to bring the major players in particle physics from beyond the European region into the discussion, ensuring that the working group’s recommendations lead to an optimum position for CERN and European particle physics in the global context. An indicator of the continuing attractiveness of CERN is the fact that Council has received four new applications...

  4. Electricity from fossil fuels without CO2 emissions: assessing the costs of carbon dioxide capture and sequestration in U.S. electricity markets.

    Science.gov (United States)

    Johnson, T L; Keith, D W

    2001-10-01

    The decoupling of fossil-fueled electricity production from atmospheric CO2 emissions via CO2 capture and sequestration (CCS) is increasingly regarded as an important means of mitigating climate change at a reasonable cost. Engineering analyses of CO2 mitigation typically compare the cost of electricity for a base generation technology to that for a similar plant with CO2 capture and then compute the carbon emissions mitigated per unit of cost. It can be hard to interpret mitigation cost estimates from this plant-level approach when a consistent base technology cannot be identified. In addition, neither engineering analyses nor general equilibrium models can capture the economics of plant dispatch. A realistic assessment of the costs of carbon sequestration as an emissions abatement strategy in the electric sector therefore requires a systems-level analysis. We discuss various frameworks for computing mitigation costs and introduce a simplified model of electric sector planning. Results from a "bottom-up" engineering-economic analysis for a representative U.S. North American Electric Reliability Council (NERC) region illustrate how the penetration of CCS technologies and the dispatch of generating units vary with the price of carbon emissions and thereby determine the relationship between mitigation cost and emissions reduction.

  5. Self-reinforcing process of the reconnection electric field in the electron diffusion region and onset of collisionless magnetic reconnection

    International Nuclear Information System (INIS)

    Lu Quanming; Lu San; Huang Can; Wu Mingyu; Wang Shui

    2013-01-01

    The onset of collisionless magnetic reconnection is considered to be controlled by electron dynamics in the electron diffusion region, where the reconnection electric field is balanced mainly by the off-diagonal electron pressure tensor term. Two-dimensional particle-in-cell simulations are employed in this paper to investigate the self-reinforcing process of the reconnection electric field in the electron diffusion region, which is found to grow exponentially. A theoretical model is proposed to demonstrate such a process in the electron diffusion region. In addition the reconnection electric field in the pileup region, which is balanced mainly by the electromotive force term, is also found to grow exponentially and its growth rate is twice that in the electron diffusion region. (paper)

  6. System for the reliability analysis of the electric energy supply; Sistema para el analisis de confiabilidad del suministro de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Perales, Favio; Martinez, Javier; Huesca, Francisco; Garcia, Norma; Nieva, Rolando [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1997-12-31

    A computer tool, developed for the reliability evaluation of the electric energy supply, considering the faults in the generation and transmission systems, is presented. The application of the tool in planning the expansion and operation of the electric systems, the methodology of the solution employed and the various functions it accounts for, are described. At the end some illustrative examples of its applications by means of the studies with a model of representative characteristics of the interconnected national system. [Espanol] Se presenta una herramienta computacional desarrollada para evaluar la confiabilidad del suministro de energia electrica, considerando las fallas en los sistemas de generacion y transmision. Se describen las aplicaciones de la herramienta en la planeacion de la expansion y de la operacion de sistemas electricos, la metodologia de solucion empleada y las diversas funciones con que cuenta. Al final se presentan algunos ejemplos ilustrativos de sus aplicaciones mediante estudios con un modelo de caracteristicas representativas del sistema interconectado nacional.

  7. System for the reliability analysis of the electric energy supply; Sistema para el analisis de confiabilidad del suministro de energia electrica

    Energy Technology Data Exchange (ETDEWEB)

    Perales, Favio; Martinez, Javier; Huesca, Francisco; Garcia, Norma; Nieva, Rolando [Instituto de Investigaciones Electricas, Cuernavaca (Mexico)

    1998-12-31

    A computer tool, developed for the reliability evaluation of the electric energy supply, considering the faults in the generation and transmission systems, is presented. The application of the tool in planning the expansion and operation of the electric systems, the methodology of the solution employed and the various functions it accounts for, are described. At the end some illustrative examples of its applications by means of the studies with a model of representative characteristics of the interconnected national system. [Espanol] Se presenta una herramienta computacional desarrollada para evaluar la confiabilidad del suministro de energia electrica, considerando las fallas en los sistemas de generacion y transmision. Se describen las aplicaciones de la herramienta en la planeacion de la expansion y de la operacion de sistemas electricos, la metodologia de solucion empleada y las diversas funciones con que cuenta. Al final se presentan algunos ejemplos ilustrativos de sus aplicaciones mediante estudios con un modelo de caracteristicas representativas del sistema interconectado nacional.

  8. IMPROVING THE RELIABILITY OF THE POWER CIRCUIT OF THE ELECTRIC TRAINS ЕР2Т AND ЕПЛ2Т

    Directory of Open Access Journals (Sweden)

    N. H. Visin

    2010-02-01

    Full Text Available The transitional processes in shunt circuit of traction engines, which armatures and excitation windings are connected in non-conducting direction as to the flowing power current, are considered in this paper. The changes in the control circuits of braking switch and in the shunt power circuit of traction engines with additional mounting a resistor of 0.5 Ohm are proposed. All this modernization will allow increasing greatly the operation reliability of power circuit of ЭР2Т and ЕПЛ2Т electric locomotives during their service life.

  9. Assessing reliability in energy supply systems

    International Nuclear Information System (INIS)

    McCarthy, Ryan W.; Ogden, Joan M.; Sperling, Daniel

    2007-01-01

    Reliability has always been a concern in the energy sector, but concerns are escalating as energy demand increases and the political stability of many energy supply regions becomes more questionable. But how does one define and measure reliability? We introduce a method to assess reliability in energy supply systems in terms of adequacy and security. It derives from reliability assessment frameworks developed for the electricity sector, which are extended to include qualitative considerations and to be applicable to new energy systems by incorporating decision-making processes based on expert opinion and multi-attribute utility theory. The method presented here is flexible and can be applied to any energy system. To illustrate its use, we apply the method to two hydrogen pathways: (1) centralized steam reforming of imported liquefied natural gas with pipeline distribution of hydrogen, and (2) on-site electrolysis of water using renewable electricity produced independently from the electricity grid

  10. Natural gas in the Asian Pacific region: market behavior and the Japanese electricity market

    International Nuclear Information System (INIS)

    Jonsson, Bo

    2001-04-01

    This dissertation consists of four main chapters, all related to the Asian Pacific natural gas market, and the role of the Japanese electricity sector. The natural gas market in Asia Pacific is heavily dependent on the demand from Japan, which imports around 75% of the gas traded as LNG (liquefied natural gas) in the region. The demand for natural gas in Japan is, in turn, almost exclusively driven by the electricity industry that consumes around 70 % of the imported natural gas. On the supply side we find seller concentrations with only six countries exporting LNG in the region. The first main chapter analyzes the market structure of the Asian Pacific natural gas market, the next two relate to the usage of natural gas in the Japanese fossil-fueled electricity production, and the final study investigates the demand for electricity in the residential sector in Japan. The first chapter argues that the buyers in Japan, through cooperation, have the potential to exert the market power that their large market share provides them with. This could be offset by the monopoly power that the six present sellers have. In the chapter four, the solutions for the four imperfect competition cases of, monoposony, monopoly, bilateral monopoly, and the Cournot model are simulated. Neither of the model solutions comes close to both the actual market price, and the actual gas volumes. The model that best mimics the actual price is the bilateral monopoly model, while the monoposony model comes closest to the actual volumes. Giving some mixed evidence of how the Asian LNG market works. Given the indication of market power, the second study analyzes the fossil-fuel mix efficiency in the power sector in Japan. If the power sector is able to exert the alleged market power, it may be the case that they minimize costs according to shadow prices instead of actual market prices. Such behavior could cause the fossil-fuel mix used for power generation to be inefficient. The analysis is based on a

  11. A Look Back at the Long Path to Mandating Electric Reliability Standards through the Energy Policy Act of 2005

    Energy Technology Data Exchange (ETDEWEB)

    Young, Ellen Swyler

    2006-07-15

    The Act was the culmination of more than eight years of legislative effort in Congress. During this period, the nation saw the Western electricity crisis of 2000-01, the Sept. 11 attacks, the collapse of Enron, the growth of RTOs, and the August 2003 blackout. Each of these influenced the dynamics of the debate. (author)

  12. Low power fluorine plasma effects on electrical reliability of AlGaN/GaN high electron mobility transistor

    International Nuclear Information System (INIS)

    Yang Ling; Zhou Xiao-Wei; Ma Xiao-Hua; Lv Ling; Zhang Jin-Cheng; Hao Yue; Cao Yan-Rong

    2017-01-01

    The new electrical degradation phenomenon of the AlGaN/GaN high electron mobility transistor (HEMT) treated by low power fluorine plasma is discovered. The saturated current, on-resistance, threshold voltage, gate leakage and breakdown voltage show that each experiences a significant change in a short time stress, and then keeps unchangeable. The migration phenomenon of fluorine ions is further validated by the electron redistribution and breakdown voltage enhancement after off-state stress. These results suggest that the low power fluorine implant ion stays in an unstable state. It causes the electrical properties of AlGaN/GaN HEMT to present early degradation. A new migration and degradation mechanism of the low power fluorine implant ion under the off-stress electrical stress is proposed. The low power fluorine ions would drift at the beginning of the off-state stress, and then accumulate between gate and drain nearby the gate side. Due to the strong electronegativity of fluorine, the accumulation of the front fluorine ions would prevent the subsequent fluorine ions from drifting, thereby alleviating further the degradation of AlGaN/GaN HEMT electrical properties. (paper)

  13. A Local Region of Interest Imaging Method for Electrical Impedance Tomography with Internal Electrodes

    Directory of Open Access Journals (Sweden)

    Hyeuknam Kwon

    2013-01-01

    Full Text Available Electrical Impedance Tomography (EIT is a very attractive functional imaging method despite the low sensitivity and resolution. The use of internal electrodes with the conventional reconstruction algorithms was not enough to enhance image resolution and accuracy in the region of interest (ROI. We propose a local ROI imaging method with internal electrodes developed from careful analysis of the sensitivity matrix that is designed to reduce the sensitivity of the voxels outside the local region and optimize the sensitivity of the voxel inside the local region. We perform numerical simulations and physical measurements to demonstrate the localized EIT imaging method. In preliminary results with multiple objects we show the benefits of using an internal electrode and the improved resolution due to the local ROI image reconstruction method. The sensitivity is further increased by allowing the surface electrodes to be unevenly spaced with a higher density of surface electrodes near the ROI. Also, we analyse how much the image quality is improved using several performance parameters for comparison. While these have not yet been studied in depth, it convincingly shows an improvement in local sensitivity in images obtained with an internal electrode in comparison to a standard reconstruction method.

  14. Assessment of regional ventilation distribution: comparison of vibration response imaging (VRI) with electrical impedance tomography (EIT).

    Science.gov (United States)

    Shi, Chang; Boehme, Stefan; Bentley, Alexander H; Hartmann, Erik K; Klein, Klaus U; Bodenstein, Marc; Baumgardner, James E; David, Matthias; Ullrich, Roman; Markstaller, Klaus

    2014-01-01

    Vibration response imaging (VRI) is a bedside technology to monitor ventilation by detecting lung sound vibrations. It is currently unknown whether VRI is able to accurately monitor the local distribution of ventilation within the lungs. We therefore compared VRI to electrical impedance tomography (EIT), an established technique used for the assessment of regional ventilation. Simultaneous EIT and VRI measurements were performed in the healthy and injured lungs (ALI; induced by saline lavage) at different PEEP levels (0, 5, 10, 15 mbar) in nine piglets. Vibration energy amplitude (VEA) by VRI, and amplitudes of relative impedance changes (rel.ΔZ) by EIT, were evaluated in seven regions of interest (ROIs). To assess the distribution of tidal volume (VT) by VRI and EIT, absolute values were normalized to the VT obtained by simultaneous spirometry measurements. Redistribution of ventilation by ALI and PEEP was detected by VRI and EIT. The linear correlation between pooled VT by VEA and rel.ΔZ was R(2) = 0.96. Bland-Altman analysis showed a bias of -1.07±24.71 ml and limits of agreement of -49.05 to +47.36 ml. Within the different ROIs, correlations of VT-distribution by EIT and VRI ranged between R(2) values of 0.29 and 0.96. ALI and PEEP did not alter the agreement of VT between VRI and EIT. Measurements of regional ventilation distribution by VRI are comparable to those obtained by EIT.

  15. Multi-channel electrical impedance tomography for regional tissue hydration monitoring.

    Science.gov (United States)

    Chen, Xiaohui; Kao, Tzu-Jen; Ashe, Jeffrey M; Boverman, Gregory; Sabatini, James E; Davenport, David M

    2014-06-01

    Poor assessment of hydration status during hemodialysis can lead to under- or over-hydration in patients with consequences of increased morbidity and mortality. In current practice, fluid management is largely based on clinical assessments to estimate dry weight (normal hydration body weight). However, hemodialysis patients usually have co-morbidities that can make the signs of fluid status ambiguous. Therefore, achieving normal hydration status remains a major challenge for hemodialysis therapy. Electrical impedance technology has emerged as a promising method for hydration monitoring due to its non-invasive nature, low cost and ease-of-use. Conventional electrical impedance-based hydration monitoring systems employ single-channel current excitation (either 2-electrode or 4-electrode methods) to perturb and extract averaged impedance from bulk tissue and use generalized models from large populations to derive hydration estimates. In the present study, a prototype, single-frequency electrical impedance tomography (EIT) system with simultaneous multi-channel current excitation was used to enable regional hydration change detection. We demonstrated the capability to detect a difference in daily impedance change between left leg and right leg in healthy human subjects, who wore a compression sock only on one leg to reduce daily gravitational fluid accumulation. The impedance difference corresponded well with the difference of lower leg volume change between left leg and right leg measured by volumetry, which on average is ~35 ml, accounting for 0.7% of the lower leg volume. We have demonstrated the feasibility of using multi-channel EIT to extract hydration information in different tissue layers with minimal skin interference. Our simultaneous, multi-channel current excitation approach provides an effective method to separate electrode contact impedance and skin condition artifacts from hydration signals. The prototype system has the potential to be used in clinical

  16. Queensland Energy Advisory Council 1984 annual review

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    The Council consists of senior officials of Government Departments involved with various aspects of assessment, production, distribution and utilisation of energy resources. Noted in the annual review are functions of QEAC; activities; overview of Queensland's energy position; non renewable resources; coal; electricity; crude oil; natural gas; PGL; oil shale; uranium; renewable resources; solar energy; wind energy and biomass.

  17. Reliability of offshore wind power production under extreme wind conditions. Deliverable D 9.5. Work Package 9: Electrical grid

    DEFF Research Database (Denmark)

    Cutululis, Nicolaos Antonio; Zeni, Lorenzo

    years, with each year simulated with five random seeds, leading to a total of 25 annual wind power time series for six large offshore wind farms, summing up to a little over 330 wind turbines. Two storm control strategies were used. The analysis involved several aspects inspired from reliability studies....... The aspects investigated are storm events occurrences and durations, storm control strategy impact on the capacity factor (lost production), the loss of production (power produced from wind drops below a certain threshold due to high wind speeds and storm controller) and finally, the wind power production......Reliability of offshore wind production under extreme wind conditions was investigated in this report. The wind power variability from existing and future large offshore wind farms in Western Denmark were simulated using the Correlated Wind model developed at Risø. The analysis was done for five...

  18. Reliability ensemble averaging of 21st century projections of terrestrial net primary productivity reduces global and regional uncertainties

    Science.gov (United States)

    Exbrayat, Jean-François; Bloom, A. Anthony; Falloon, Pete; Ito, Akihiko; Smallman, T. Luke; Williams, Mathew

    2018-02-01

    Multi-model averaging techniques provide opportunities to extract additional information from large ensembles of simulations. In particular, present-day model skill can be used to evaluate their potential performance in future climate simulations. Multi-model averaging methods have been used extensively in climate and hydrological sciences, but they have not been used to constrain projected plant productivity responses to climate change, which is a major uncertainty in Earth system modelling. Here, we use three global observationally orientated estimates of current net primary productivity (NPP) to perform a reliability ensemble averaging (REA) method using 30 global simulations of the 21st century change in NPP based on the Inter-Sectoral Impact Model Intercomparison Project (ISIMIP) business as usual emissions scenario. We find that the three REA methods support an increase in global NPP by the end of the 21st century (2095-2099) compared to 2001-2005, which is 2-3 % stronger than the ensemble ISIMIP mean value of 24.2 Pg C y-1. Using REA also leads to a 45-68 % reduction in the global uncertainty of 21st century NPP projection, which strengthens confidence in the resilience of the CO2 fertilization effect to climate change. This reduction in uncertainty is especially clear for boreal ecosystems although it may be an artefact due to the lack of representation of nutrient limitations on NPP in most models. Conversely, the large uncertainty that remains on the sign of the response of NPP in semi-arid regions points to the need for better observations and model development in these regions.

  19. ITER council proceedings: 1996

    International Nuclear Information System (INIS)

    1997-01-01

    Records of the 10. ITER Council Meeting (IC-10), held on 26-27 July 1996, in St. Petersburg, Russia, and the 11. ITER Council Meeting (IC-11) held on 17-18 December 1996, in Tokyo, Japan, are presented, giving essential information on the evolution of the ITER Engineering Design Activities (EDA) and the cost review and safety analysis. Figs, tabs

  20. European works councils

    DEFF Research Database (Denmark)

    Knudsen, Herman Lyhne

    2004-01-01

    The theme addressed by this artcle is the opportunities for European Works Councils of gaining influence on corporate decisions in multinational companies.......The theme addressed by this artcle is the opportunities for European Works Councils of gaining influence on corporate decisions in multinational companies....

  1. Regional Charging Infrastructure for Plug-In Electric Vehicles: A Case Study of Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Raghavan, Sesha [National Renewable Energy Lab. (NREL), Golden, CO (United States); Rames, Clement [National Renewable Energy Lab. (NREL), Golden, CO (United States); Eichman, Joshua [National Renewable Energy Lab. (NREL), Golden, CO (United States); Melaina, Marc [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2017-01-01

    Given the complex issues associated with plug-in electric vehicle (PEV) charging and options in deploying charging infrastructure, there is interest in exploring scenarios of future charging infrastructure deployment to provide insight and guidance to national and regional stakeholders. The complexity and cost of PEV charging infrastructure pose challenges to decision makers, including individuals, communities, and companies considering infrastructure installations. The value of PEVs to consumers and fleet operators can be increased with well-planned and cost-effective deployment of charging infrastructure. This will increase the number of miles driven electrically and accelerate PEV market penetration, increasing the shared value of charging networks to an expanding consumer base. Given these complexities and challenges, the objective of the present study is to provide additional insight into the role of charging infrastructure in accelerating PEV market growth. To that end, existing studies on PEV infrastructure are summarized in a literature review. Next, an analysis of current markets is conducted with a focus on correlations between PEV adoption and public charging availability. A forward-looking case study is then conducted focused on supporting 300,000 PEVs by 2025 in Massachusetts. The report concludes with a discussion of potential methodology for estimating economic impacts of PEV infrastructure growth.

  2. Electric-current Neutralization, Magnetic Shear, and Eruptive Activity in Solar Active Regions

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Yang; Sun, Xudong [W. W. Hansen Experimental Physics Laboratory, Stanford University, Stanford, CA 94305-4085 (United States); Török, Tibor; Titov, Viacheslav S. [Predictive Science Inc., 9990 Mesa Rim Road, Suite 170, San Diego, CA 92121 (United States); Leake, James E. [NASA Goddard Space Flight Center, Greenbelt, MD 20771 (United States)

    2017-09-01

    The physical conditions that determine whether or not solar active regions (ARs) produce strong flares and coronal mass ejections (CMEs) are not yet well understood. Here, we investigate the association between electric-current neutralization, magnetic shear along polarity inversion lines (PILs), and eruptive activity in four ARs: two emerging and two well-developed ones. We find that the CME-producing ARs are characterized by a strongly non-neutralized total current, while the total current in the ARs that did not produce CMEs is almost perfectly neutralized. The difference in the PIL shear between these two groups is much less pronounced, which suggests that the degree of current neutralization may serve as a better proxy for assessing the ability of ARs to produce CMEs.

  3. Nuclear science. U.S. electricity needs and DOE's civilian reactor development program

    International Nuclear Information System (INIS)

    England-Joseph, Judy; Allen, Robert E. Jr.; Fitzgerald, Duane; Young, Edward E. Jr.; Leavens, William P.; Bell, Jacqueline

    1990-05-01

    Electricity projections developed by the North American Electric Reliability Council (NERC) appear to be the best available estimates of future U.S. electricity needs. NERC, which represents all segments of the utility industry, forecasts that before 1998 certain regions of the country, particularly in the more heavily populated eastern half of the United States, may experience shortfalls during summer peak demand periods. These forecasts considered the utility companies' plans, as of 1989, to meet electricity needs during the period; these plans include such measures as constructing additional generators and conducting demand management programs. Working closely with the nuclear industry, DOE is supporting the development of several reactor technologies to ensure that nuclear power remains a viable electricity supply option. In fiscal year 1990, DOE's Civilian Reactor Development Program was funded at $253 million. DOE is using these funds to support industry-led efforts to develop light water reactors (LWR), advanced liquid-metal reactors (LMR), and modular high-temperature gas-cooled reactors (MHTGR) that are safe, environmentally acceptable, and economically competitive. The utility company officials we spoke with, all of whom were in the Southeast, generally supported DOE's efforts in developing these technologies. However, most of the officials do not plan to purchase nuclear reactors until after 2000 because of the high costs of constructing nuclear reactors and current public opposition to nuclear power

  4. ITER council proceedings: 1992

    International Nuclear Information System (INIS)

    1994-01-01

    At the signing of the ITER EDA Agreement on July, 1992, each of the Parties presented to the Director General the names of their designated members of the ITER Council. Upon receiving those names, the Director General stated that the ITER Engineering Design Activities were ''ready to begin''. The next step in this process was the convening of the first meeting of the ITER Council. The first meeting of the Council, held in Vienna, was opened by Director General Hans Blix. The second meeting was held in Moscow, the formal seat of the Council. This volume presents records of these first two Council meetings and, together with the previous volumes on the text of the Agreement and Protocol 1 and the preparations for their signing respectively, represents essential information on the evolution of the ITER EDA

  5. Puget Sound Area Electric Reliability Plan. Appendix D, Conservation, Load Management and Fuel Switching Analysis : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    Various conservation, load management, and fuel switching programs were considered as ways to reduce or shift system peak load. These programs operate at the end-use level, such as residential water heat. Figure D-1a shows what electricity consumption for water heat looks like on normal and extreme peak days. Load management programs, such as water heat control, are designed to reduce electricity consumption at the time of system peak. On the coldest day in average winter, system load peaks near 8:00 a.m. In a winter with extremely cold weather, electricity consumption increases fr all hours, and the system peak shifts to later in the morning. System load shapes in the Puget Sound area are shown in Figure D-1b for a normal winter peak day (February 2, 1988) and extreme peak day (February 3, 1989). Peak savings from any program are calculated to be the reduction in loads on the entire system at the hour of system peak. Peak savings for all programs are measured at 8:00 a.m. on a normal peak day and 9:00 a.m. on an extreme peak day. On extremely cold day, some water heat load shifts to much later in the morning, with less load available for shedding at the time of system peak. Models of hourly end-use consumption were constructed to simulate the impact of conservation, land management, and fuel switching programs on electricity consumption. Javelin, a time-series simulating package for personal computers, was chosen for the hourly analysis. Both a base case and a program case were simulated. 15 figs., 7 tabs.

  6. Electricity access. Southern Africa sub-regional study: South Africa and Zimbabwe

    Energy Technology Data Exchange (ETDEWEB)

    Davidson, O.R.; Mwakasonda, S.A.

    2004-07-01

    , grants and other sources. A standard connection subsidy is given to new households under the national electrification programme, with subsidy levels differentiated by geographic region, supply technology or other factors. The Electricity Basic Services Support Tariff (EBSST) is another initiative that the South African Government established in 2002 to provide free electricity of 20-50 kWh per household, per month to the poorest segments of the population. The support tariff is intended to provide an approximate amount of power required for basic lighting, media access and limited cooking. It is worth about ZAR 200 per year to a poor household. The initial cost to government is estimated at about ZAR 630 million annually and it is expected to increase with growth in the rate of electrification. An offgrid electrification programme that mainly involves the dissemination of solar home systems (SHS) to the disadvantaged areas was started in 2000. At present, about 12,000 such systems have been disseminated with over 70 per cent direct subsidy from government. Zimbabwe is a landlocked country in Southern Africa and a member of SADC. Independence in April 1980 ended its white-minority rule, with the country inheriting all the ilts of a racially divided society. Zimbabwe's economy relies heavily on agricultural trops, with significant levels of poverty that are Glosely related to the country's history of governance by the minority white government. After independence, the government embarked on policies aimed at redressing economic inbalances of the past, including reforms in the power sector. Power sector objectives in Zimbabwe include increasing electricity access to previously disadvantaged people through gnid electricity expansion and offgrid electrification. The Zimbabwe Electricity Supply Authority (ZESA) is the main utility responsible for the generation, transmission and distribution of electricity. Unfortunately, ZESA generating capacity is not sufficient to

  7. Unilateral empyema impacts the assessment of regional lung ventilation by electrical impedance tomography

    International Nuclear Information System (INIS)

    Bläser, D; Becher, T; Schädler, D; Elke, G; Weiler, N; Frerichs, I; Pulletz, S

    2014-01-01

    Several studies have shown the ability of electrical impedance tomography (EIT) to assess regional ventilation distribution in human lungs. Fluid accumulation in the pleural space as in empyema, typically occurring on one chest side, may influence the distribution of ventilation and the corresponding EIT findings. The aim of our study was to examine this effect on the assessment of regional ventilation by EIT. Six patients suffering from unilateral empyema and intubated with a double-lumen endotracheal tube were studied. EIT data were acquired during volume-controlled ventilation with bilateral (tidal volume (V T ): 800 ml) and unilateral ventilation (V T : 400 ml) of the right and left lungs. Mean tidal amplitudes of the EIT signal were calculated in all image pixels. The sums of these values, expressed as relative impedance change (rel. ΔZ), were then determined in whole images and functionally defined regions-of-interest (ROI). The sums of rel. ΔZ calculated during the two cases of one-lung ventilation either on the affected or unaffected side were significantly smaller than during bilateral ventilation. However, in contrast to previous findings in patients with no pleural pathology, very low values of rel. ΔZ were found when the lung on the affected side was ventilated. ROI-based analysis rendered higher values than the whole-image analysis in this case, nonetheless, the values were significantly smaller than when the unaffected side was ventilated in spite of identical V T . In conclusion, our results indicate that the presence of empyema may affect the quantitative evaluation of regional lung ventilation by EIT. (paper)

  8. Did the expiration of retail price caps affect prices in the restructured Texas electricity market?

    International Nuclear Information System (INIS)

    Kang, Linhong; Zarnikau, Jay

    2009-01-01

    On January 1, 2007, the Electric Reliability Council of Texas (ERCOT) market became the first restructured market in the US to completely remove caps on the prices which could be charged to residential energy consumers by the retailers associated with the traditional or incumbent utility service providers. Our analysis suggests that the expiration of the price-to-beat (PTB) price caps may have led to a reduction in the average prices charged by competitive retail electric providers (REPs). (author)

  9. Carbon and energy footprints of electric delivery trucks:a hybrid multi-regional input-output life cycle assessment

    OpenAIRE

    Zhao, Yang; Onat, Nuri Cihat; Küçükvar, Murat; Tatari, Ömer

    2016-01-01

    Due to frequent stop-and-go operation and long idling periods when driving in congested urban areas, the electrification of commercial delivery trucks has become an interesting topic nationwide. In this study, environmental impacts of various alternative delivery trucks including battery electric, diesel, diesel-electric hybrid, and compressed natural gas trucks are analyzed. A novel life cycle assessment method, an environmentally-extended multi-region input-output analysis, is utilized to c...

  10. The reliability assessment of the electromagnetic valve of high-speed electric multiple units braking system based on two-parameter exponential distribution

    Directory of Open Access Journals (Sweden)

    Jianwei Yang

    2016-06-01

    Full Text Available In order to solve the reliability assessment of braking system component of high-speed electric multiple units, this article, based on two-parameter exponential distribution, provides the maximum likelihood estimation and Bayes estimation under a type-I life test. First of all, we evaluate the failure probability value according to the classical estimation method and then obtain the maximum likelihood estimation of parameters of two-parameter exponential distribution by performing and using the modified likelihood function. On the other hand, based on Bayesian theory, this article also selects the beta and gamma distributions as the prior distribution, combines with the modified maximum likelihood function, and innovatively applies a Markov chain Monte Carlo algorithm to parameters assessment based on Bayes estimation method for two-parameter exponential distribution, so that two reliability mathematical models of the electromagnetic valve are obtained. Finally, through type-I life test, the failure rates according to maximum likelihood estimation and Bayes estimation method based on Markov chain Monte Carlo algorithm are, respectively, 2.650 × 10−5 and 3.037 × 10−5. Compared with the failure rate of a electromagnetic valve 3.005 × 10−5, it proves that the Bayes method can use a Markov chain Monte Carlo algorithm to estimate reliability for two-parameter exponential distribution and Bayes estimation is more closer to the value of electromagnetic valve. So, by fully integrating multi-source, Bayes estimation method can preferably modify and precisely estimate the parameters, which can provide a certain theoretical basis for the safety operation of high-speed electric multiple units.

  11. Modelling renewable energy resource and the electricity network (East Midlands region)

    Energy Technology Data Exchange (ETDEWEB)

    Newton, P.A.; Ma, T.

    2002-07-01

    The UK Government's targets for renewable generation and combined heat and power (CHP) are expected to result in a significant growth in embedded generation. This report describes the results of a study of the capability of the electricity distribution network in the East Midlands to accept embedded generation. Detailed network studies were performed for two sample networks: one representing an urban network (Leicester) and one representing a rural network (Boston). The 132 kV networks of the grid groups covering these areas were also studied. This included an examination of the connection points from major 132 kV busbars at grid supply points down to 11 kV primary substations. Power system studies were performed to identify the constraints and capabilities of the existing network, These studies included load flow to examine voltage profile and overloading, fault level analysis and transient studies to examine generator and network stability following faults on the network and voltage step change due to generator tripping. Space network capacity for the region was identified and used to assess the ability to accommodate regional targets for renewables and CHP. The study also examined constraining factors and potential solutions, including four improvement scenarios.

  12. Regional cerebral blood flow changes associated with focal electrically administered seizure therapy (FEAST).

    Science.gov (United States)

    Chahine, George; Short, Baron; Spicer, Ken; Schmidt, Matthew; Burns, Carol; Atoui, Mia; George, Mark S; Sackeim, Harold A; Nahas, Ziad

    2014-01-01

    Use of electroconvulsive therapy (ECT) is limited by cognitive disturbance. Focal electrically-administered seizure therapy (FEAST) is designed to initiate focal seizures in the prefrontal cortex. To date, no studies have documented the effects of FEAST on regional cerebral blood flow (rCBF). A 72 year old depressed man underwent three single photon emission computed tomography (SPECT) scans to capture the onset and resolution of seizures triggered with right unilateral FEAST. We used Bioimage Suite for within-subject statistical analyses of perfusion differences ictally and post-ictally compared with the baseline scan. Early ictal increases in regional cerebral blood flow (rCBF) were limited to the right prefrontal cortex. Post-ictally, perfusion was reduced in bilateral frontal and occipital cortices and increased in left motor and precuneus cortex. FEAST appears to triggers focal onsets of seizure activity in the right prefrontal cortex with subsequent generalization. Future studies are needed on a larger sample. Copyright © 2014 Elsevier Inc. All rights reserved.

  13. Southeast Regional Assessment Study: an assessment of the opportunities of solar electric power generation in the Southeastern United States

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    The objective of this study was to identify and assess opportunities for demonstration and large scale deployment of solar electric facilities in the southeast region and to define the technical, economic, and institutional factors that can contribute to an accelerated use of solar energy for electric power generation. Graphs and tables are presented indicating the solar resource potential, siting opportunities, energy generation and use, and socioeconomic factors of the region by state. Solar electric technologies considered include both central station and dispersed solar electric generating facilities. Central stations studied include solar thermal electric, wind, photovoltaic, ocean thermal gradient, and biomass; dispersed facilities include solar thermal total energy systems, wind, and photovoltaic. The value of solar electric facilities is determined in terms of the value of conventional facilities and the use of conventional fuels which the solar facilities can replace. Suitable cost and risk sharing mechanisms to accelerate the commercialization of solar electric technologies in the Southeast are identified. The major regulatory and legal factors which could impact on the commercialization of solar facilities are reviewed. The most important factors which affect market penetration are reviewed, ways to accelerate the implementation of these technologies are identified, and market entry paths are identified. Conclusions and recommendations are presented. (WHK)

  14. Effects of Nitrogen and Hydrogen Codoping on the Electrical Performance and Reliability of InGaZnO Thin-Film Transistors.

    Science.gov (United States)

    Abliz, Ablat; Gao, Qingguo; Wan, Da; Liu, Xingqiang; Xu, Lei; Liu, Chuansheng; Jiang, Changzhong; Li, Xuefei; Chen, Huipeng; Guo, Tailiang; Li, Jinchai; Liao, Lei

    2017-03-29

    Despite intensive research on improvement in electrical performances of ZnO-based thin-film transistors (TFTs), the instability issues have limited their applications for complementary electronics. Herein, we have investigated the effect of nitrogen and hydrogen (N/H) codoping on the electrical performance and reliability of amorphous InGaZnO (α-IGZO) TFTs. The performance and bias stress stability of α-IGZO device were simultaneously improved by N/H plasma treatment with a high field-effect mobility of 45.3 cm 2 /(V s) and small shifts of threshold voltage (V th ). On the basis of X-ray photoelectron spectroscopy analysis, the improved electrical performances of α-IGZO TFT should be attributed to the appropriate amount of N/H codoping, which could not only control the V th and carrier concentration efficiently, but also passivate the defects such as oxygen vacancy due to the formation of stable Zn-N and N-H bonds. Meanwhile, low-frequency noise analysis indicates that the average trap density near the α-IGZO/SiO 2 interface is reduced by the nitrogen and hydrogen plasma treatment. This method could provide a step toward the development of α-IGZO TFTs for potential applications in next-generation high-definition optoelectronic displays.

  15. Functional near-infrared spectroscopy to probe sensorimotor region activation during electrical stimulation-evoked movement.

    Science.gov (United States)

    Muthalib, Makii; Ferrari, Marco; Quaresima, Valentina; Kerr, Graham; Perrey, Stephane

    2017-11-07

    This study used non-invasive functional near-infrared spectroscopy (fNIRS) neuroimaging to monitor bilateral sensorimotor region activation during unilateral voluntary (VOL) and neuromuscular electrical stimulation (NMES)-evoked movements. In eight healthy male volunteers, fNIRS was used to measure relative changes in oxyhaemoglobin (O 2 Hb) and deoxyhaemoglobin (HHb) concentrations from a cortical sensorimotor region of interest in the left (LH) and right (RH) hemispheres during NMES-evoked and VOL wrist extension movements of the right arm. NMES-evoked movements induced significantly greater activation (increase in O 2 Hb and concomitant decrease in HHb) in the contralateral LH than in the ipsilateral RH (O 2 Hb: 0·44 ± 0·16 μM and 0·25 ± 0·22 μM, P = 0·017; HHb: -0·19 ± 0·10 μM and -0·12 ± 0·09 μM, P = 0·036, respectively) as did VOL movements (0·51 ± 0·24 μΜ and 0·34 ± 0·21 μM, P = 0·031; HHb: -0·18 ± 0·07 μΜ and -0·12 ± 0·04 μΜ, P = 0·05, respectively). There was no significant difference between conditions for O 2 Hb (P = 0·144) and HHb (P = 0·958). fNIRS neuroimaging enables quantification of bilateral sensorimotor regional activation profiles during voluntary and NMES-evoked wrist extension movements. © 2017 Scandinavian Society of Clinical Physiology and Nuclear Medicine. Published by John Wiley & Sons Ltd.

  16. Use of electrical impedance tomography to monitor regional cerebral edema during clinical dehydration treatment.

    Directory of Open Access Journals (Sweden)

    Feng Fu

    Full Text Available OBJECTIVE: Variations of conductive fluid content in brain tissue (e.g. cerebral edema change tissue impedance and can potentially be measured by Electrical Impedance Tomography (EIT, an emerging medical imaging technique. The objective of this work is to establish the feasibility of using EIT as an imaging tool for monitoring brain fluid content. DESIGN: a prospective study. SETTING: In this study EIT was used, for the first time, to monitor variations in cerebral fluid content in a clinical model with patients undergoing clinical dehydration treatment. The EIT system was developed in house and its imaging sensitivity and spatial resolution were evaluated on a saline-filled tank. PATIENTS: 23 patients with brain edema. INTERVENTIONS: The patients were continuously imaged by EIT for two hours after initiation of dehydration treatment using 0.5 g/kg intravenous infusion of mannitol for 20 minutes. MEASUREMENT AND MAIN RESULTS: Overall impedance across the brain increased significantly before and after mannitol dehydration treatment (p = 0.0027. Of the all 23 patients, 14 showed high-level impedance increase and maintained this around 4 hours after the dehydration treatment whereas the other 9 also showed great impedance gain during the treatment but it gradually decreased after the treatment. Further analysis of the regions of interest in the EIT images revealed that diseased regions, identified on corresponding CT images, showed significantly less impedance changes than normal regions during the monitoring period, indicating variations in different patients' responses to such treatment. CONCLUSIONS: EIT shows potential promise as an imaging tool for real-time and non-invasive monitoring of brain edema patients.

  17. Signatures of the high-altitude polar cusp and dayside auroral regions as seen by the Viking electric field experiment

    International Nuclear Information System (INIS)

    Marklund, G.T.; Blomberg, L.G.; Faelthammar, C.G.; Erlandson, R.E.; Potemra, T.A.

    1990-01-01

    Electric field and satellite potential observations along 42 Viking orbits in the high-altitude (2R E ) polar cusp and dayside auroral region have been examined. Within the cusp the plasma density usually reaches a maximum, and it is typically very homogeneous, in contrast to the irregular and lower density in the cleft and dayside auroral regions. The maxima in the plasma density are sometimes anticorrelated with the magnetic field strength, indicating a diamagnetic effect. The entire cusp and dayside auroral regions are characterized by irregular and burstlike electric fields, comprising field reversals on various scales (up to 3 min or 500 km), the larger scales, however, being rare in the cusp. Another common feature in these regions is the high correlation between mutually orthogonal components of the electric and magnetic fields, both for large-scale variations across spatial structures and for wave and pulsations in the ULF frequency range. The electric field signatures in the cusp (in the 1100-1300 MLT sector) are, however, characteristically different from the cleft and oval field signatures in that the electric field is usually less intense and less structured and not correlated with the substorm activity level

  18. ITER council proceedings: 2001

    International Nuclear Information System (INIS)

    2001-01-01

    Continuing the ITER EDA, two further ITER Council Meetings were held since the publication of ITER EDA documentation series no, 20, namely the ITER Council Meeting on 27-28 February 2001 in Toronto, and the ITER Council Meeting on 18-19 July in Vienna. That Meeting was the last one during the ITER EDA. This volume contains records of these Meetings, including: Records of decisions; List of attendees; ITER EDA status report; ITER EDA technical activities report; MAC report and advice; Final report of ITER EDA; and Press release

  19. Elections to Staff Council

    CERN Multimedia

    Saff Association

    2013-01-01

    2013 Elections to Staff Council   Vote! Make your voice heard and be many to elect the new Staff Council. More details on the elections can be found on the Staff Association web site (https://ap-vote.web.cern.ch/elections-2013).   Timetable elections Monday 28 October to Monday 11 November, 12:00 am voting Monday 18 and Monday 25 November, publication of the results in Echo Tuesday 19 November, Staff Association Assizes Tuesday 3 December, first meeting of the new Staff Council and election of the new Executive Committee The voting procedure is monitored by the Election Committee.

  20. Reliable fuzzy H∞ control for active suspension of in-wheel motor driven electric vehicles with dynamic damping

    Science.gov (United States)

    Shao, Xinxin; Naghdy, Fazel; Du, Haiping

    2017-03-01

    A fault-tolerant fuzzy H∞ control design approach for active suspension of in-wheel motor driven electric vehicles in the presence of sprung mass variation, actuator faults and control input constraints is proposed. The controller is designed based on the quarter-car active suspension model with a dynamic-damping-in-wheel-motor-driven-system, in which the suspended motor is operated as a dynamic absorber. The Takagi-Sugeno (T-S) fuzzy model is used to model this suspension with possible sprung mass variation. The parallel-distributed compensation (PDC) scheme is deployed to derive a fault-tolerant fuzzy controller for the T-S fuzzy suspension model. In order to reduce the motor wear caused by the dynamic force transmitted to the in-wheel motor, the dynamic force is taken as an additional controlled output besides the traditional optimization objectives such as sprung mass acceleration, suspension deflection and actuator saturation. The H∞ performance of the proposed controller is derived as linear matrix inequalities (LMIs) comprising three equality constraints which are solved efficiently by means of MATLAB LMI Toolbox. The proposed controller is applied to an electric vehicle suspension and its effectiveness is demonstrated through computer simulation.

  1. Reliability engineering

    International Nuclear Information System (INIS)

    Lee, Chi Woo; Kim, Sun Jin; Lee, Seung Woo; Jeong, Sang Yeong

    1993-08-01

    This book start what is reliability? such as origin of reliability problems, definition of reliability and reliability and use of reliability. It also deals with probability and calculation of reliability, reliability function and failure rate, probability distribution of reliability, assumption of MTBF, process of probability distribution, down time, maintainability and availability, break down maintenance and preventive maintenance design of reliability, design of reliability for prediction and statistics, reliability test, reliability data and design and management of reliability.

  2. Multi-channel electrical impedance tomography for regional tissue hydration monitoring

    International Nuclear Information System (INIS)

    Chen, Xiaohui; Kao, Tzu-Jen; Ashe, Jeffrey M; Boverman, Gregory; Sabatini, James E; Davenport, David M

    2014-01-01

    Poor assessment of hydration status during hemodialysis can lead to under- or over-hydration in patients with consequences of increased morbidity and mortality. In current practice, fluid management is largely based on clinical assessments to estimate dry weight (normal hydration body weight). However, hemodialysis patients usually have co-morbidities that can make the signs of fluid status ambiguous. Therefore, achieving normal hydration status remains a major challenge for hemodialysis therapy. Electrical impedance technology has emerged as a promising method for hydration monitoring due to its non-invasive nature, low cost and ease-of-use. Conventional electrical impedance-based hydration monitoring systems employ single-channel current excitation (either 2-electrode or 4-electrode methods) to perturb and extract averaged impedance from bulk tissue and use generalized models from large populations to derive hydration estimates. In the present study, a prototype, single-frequency electrical impedance tomography (EIT) system with simultaneous multi-channel current excitation was used to enable regional hydration change detection. We demonstrated the capability to detect a difference in daily impedance change between left leg and right leg in healthy human subjects, who wore a compression sock only on one leg to reduce daily gravitational fluid accumulation. The impedance difference corresponded well with the difference of lower leg volume change between left leg and right leg measured by volumetry, which on average is ∼35 ml, accounting for 0.7% of the lower leg volume. We have demonstrated the feasibility of using multi-channel EIT to extract hydration information in different tissue layers with minimal skin interference. Our simultaneous, multi-channel current excitation approach provides an effective method to separate electrode contact impedance and skin condition artifacts from hydration signals. The prototype system has the potential to be used in

  3. Electric Power Consumption Coefficients for U.S. Industries: Regional Estimation and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Boero, Riccardo [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-07-21

    Economic activity relies on electric power provided by electrical generation, transmission, and distribution systems. This paper presents a method developed at Los Alamos National Laboratory to estimate electric power consumption by different industries in the United States. Results are validated through comparisons with existing literature and benchmarking data sources. We also discuss the limitations and applications of the presented method, such as estimating indirect electric power consumption and assessing the economic impact of power outages based on input-output economic models.

  4. Electricity

    International Nuclear Information System (INIS)

    Tombs, F.

    1983-01-01

    The subject is discussed, with particular reference to the electricity industry in the United Kingdom, under the headings; importance and scope of the industry's work; future fuel supplies (estimated indigenous fossil fuels reserves); outlook for UK energy supplies; problems of future generating capacity and fuel mix (energy policy; construction programme; economics and pricing; contribution of nuclear power - thermal and fast reactors; problems of conversion of oil-burning to coal-burning plant). (U.K.)

  5. MRI-Guided Regional Personalized Electrical Stimulation in Multisession and Home Treatments

    Directory of Open Access Journals (Sweden)

    Andrea Cancelli

    2018-05-01

    Full Text Available The shape and position of the electrodes is a key factor for the efficacy of transcranial electrical stimulations (tES. We have recently introduced the Regional Personalized Electrode (RePE, a tES electrode fitting the personal cortical folding, that has been able to differentiate the stimulation of close by regions, in particular the primary sensory (S1 and motor (M1 cortices, and to personalize tES onto such an extended cortical district. However, neuronavigation on individual brain was compulsory for the correct montage. Here, we aimed at developing and testing a neuronavigation-free procedure for easy and quick positioning RePE, enabling multisession RePE-tES at home. We used off-line individual MRI to shape RePE via an ad-hoc computerized procedure, while an ad-hoc developed Adjustable Helmet Frame (AHF was used to properly position it in multisession treatments, even at home. We used neuronavigation to test the RePE shape and position obtained by the new computerized procedure and the re-positioning obtained via the AHF. Using Finite Element Method (FEM model, we also estimated the intra-cerebral current distribution induced by transcranial direct current stimulation (tDCS comparing RePE vs. non-RePE with fixed reference. Additionally, we tested, using FEM, various shapes, and positions of the reference electrode taking into account possible small displacements of RePE, to test feasibility of RePE-tES sessions at home. The new RePE neuronavigation-free positioning relies on brain MRI space distances, and produced a mean displacement of 3.5 ± 0.8 mm, and the re-positioning of 4.8 ± 1.1 mm. Higher electric field in S1 than in M1 was best obtained with the occipital reference electrode, a montage that proved to feature low sensitivity to typical RePE millimetric displacements. Additionally, a new tES accessory was developed to enable repositioning the electrodes over the scalp also at home, with a precision which is acceptable according to

  6. Medicare Appeals Council Decisions

    Data.gov (United States)

    U.S. Department of Health & Human Services — Decisions of the Departmental Appeals Board's Medicare Appeals Council involving claims for entitlement to Medicare and individual claims for Medicare coverage and...

  7. About the Territorial Potential of the Construction of Battery-Charging Stations for Autonomous Electric Motor Vehicles in the Regions

    Directory of Open Access Journals (Sweden)

    Shilova Lyubov

    2016-01-01

    Full Text Available The article describes the main current trends in the development of electric motor vehicles with "zero emission" as well as the battery-charging stations concerned. The study is based on a preliminary comparative analysis of the RF regions with respect to five indices (average per capita income, number of private cars in the region, air pollution level, provision of the region with power supply and the potential use of local renewable energy resources, and it gives some recommendations on the prospects of possible construction of battery-charging stations in the regions.

  8. ITER council proceedings: 1995

    International Nuclear Information System (INIS)

    1996-01-01

    Records of the 8. ITER Council Meeting (IC-8), held on 26-27 July 1995, in San Diego, USA, and the 9. ITER Council Meeting (IC-9) held on 12-13 December 1995, in Garching, Germany, are presented, giving essential information on the evolution of the ITER Engineering Design Activities (EDA) and the ITER Interim Design Report Package and Relevant Documents. Figs, tabs

  9. ITER council proceedings: 1998

    International Nuclear Information System (INIS)

    1999-01-01

    This volume contains documents of the 13th and the 14th ITER council meeting as well as of the 1st extraordinary ITER council meeting. Documents of the ITER meetings held in Vienna and Yokohama during 1998 are also included. The contents include an outline of the ITER objectives, the ITER parameters and design overview as well as operating scenarios and plasma performance. Furthermore, design features, safety and environmental characteristics are given

  10. Effect of organic-buffer-layer on electrical property and environmental reliability of Ga-doped ZnO films prepared by RF plasma assisted DC magnetron sputtering on plastic substrate

    International Nuclear Information System (INIS)

    Hinoki, Toshio; Kyuhara, Chika; Agura, Hideaki; Yazawa, Kenji; Kinoshita, Kentaro; Ohmi, Koutoku; Kishida, Satoru

    2010-01-01

    Ga-doped ZnO (GZO) transparent conductive films have been prepared by RF plasma assisted DC magnetron sputtering under a reductive atmosphere on organic-buffer-layer (OBL) coated polyethylene telephthalate (PET) substrates without intentionally heating substrates. Electrical and optical properties, crystallinity, and environmental reliability of the GZO films have been investigated. The distributional characteristic of resistivity is observed in the GZO film deposited on the OBL-coated PET substrates. The high resistivity at facing the erosion area in the source target is reduced by providing the RF plasma and H 2 gas near the substrate, resulting in a uniform distribution of the sheet resistance. It has been also found that the increase of resistivity by an accelerated aging test performed under a storage condition at 60 o C and at a relative humidity of 95% is suppressed by employing the OBL. The OBL suppresses the formation of cracks, which are induced by the aging test. These facts are thought to contribute to a high environmental reliability of GZO films on PET substrates. Values of resistivity, Hall mobility and carrier concentration are obtained: 5.0-20 x 10 -3 Ω cm, 4.0 cm 2 /Vs, and 3.8 x 10 20 cm -3 , respectively. An average transmittance of the GZO film including OBL and PET substrate is 78% in a visible region. The OBL enables to realize the practical use of GZO films on PET sheets.

  11. News from Council

    CERN Multimedia

    2015-01-01

    Today concludes a very busy week for Council. As you’ll have seen from the press release this morning, Council elected a new President, who will take up his mandate on 1 January along with the new management team, which was also approved by Council yesterday.   You’ll find full details of the incoming Director-General’s management team and structures here. Completing the configuration for the immediate future, Council also approved the medium term plan, along with the budget for 2016. In other Council business, two complete applications for Associate Membership were discussed. Following an earlier letter, India’s complete application was received and considered by Council. Consequently, a fact-finding mission has been established to report back before the end of the year. A new application was also received from Azerbaijan, with a fact-finding mission to be established. India’s involvement with CERN goes back to the 1970s, and the country...

  12. Stuttgart Regional Court: Decision of October 3, 1980 - on the boycotting of electricity rate payments

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    Due to lawsuit economy, the interest of the electricity supply utility in obtaining a declaratory judgment, stating that an electricity rate payment boycotter has no right of refusal to pay, and no right to withhold payment of, rates with regard to future claims from electricity supplies, has to be advocated. To affirm interest in a declaratory action, it is sufficient that the future obligations of the electricity rate payment boycotter can be described as the result of present electricity supply relationships. Vis-a-vis the electricity supply utility, the electricity rate payment boycotter has no right of refusal to pay, and no right to withhold payment of, rates because of the operation of a nuclear power station. (orig.) [de

  13. Validating computationally predicted TMS stimulation areas using direct electrical stimulation in patients with brain tumors near precentral regions.

    Science.gov (United States)

    Opitz, Alexander; Zafar, Noman; Bockermann, Volker; Rohde, Veit; Paulus, Walter

    2014-01-01

    The spatial extent of transcranial magnetic stimulation (TMS) is of paramount interest for all studies employing this method. It is generally assumed that the induced electric field is the crucial parameter to determine which cortical regions are excited. While it is difficult to directly measure the electric field, one usually relies on computational models to estimate the electric field distribution. Direct electrical stimulation (DES) is a local brain stimulation method generally considered the gold standard to map structure-function relationships in the brain. Its application is typically limited to patients undergoing brain surgery. In this study we compare the computationally predicted stimulation area in TMS with the DES area in six patients with tumors near precentral regions. We combine a motor evoked potential (MEP) mapping experiment for both TMS and DES with realistic individual finite element method (FEM) simulations of the electric field distribution during TMS and DES. On average, stimulation areas in TMS and DES show an overlap of up to 80%, thus validating our computational physiology approach to estimate TMS excitation volumes. Our results can help in understanding the spatial spread of TMS effects and in optimizing stimulation protocols to more specifically target certain cortical regions based on computational modeling.

  14. Reduction of regional disparities in electric power prices by spatially effective measures and planning in the Federal Republic of Germany

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, G

    1984-01-01

    For a long time energy policy has been trying to reduce disparities in electric power prices by administrative and financial measures alone. Governmental planning was opening up new prospects when long-range fuel transport - and in particular the transport of hard coal by ship or by rail - was seeing a drop in prices in the mid seventies. Since fuel transport has been lower-priced than the transport of equivalent quantities of electric power, regional disparities in electric power prices which are due to the respective supply structures may be levelled by way of power plant site selection and power plant installation according to the specific regional loads. A decentralized expansion of power generation within reach of the consumer requires but a minimum of wiring. Structural price disparities are reduced in particular in regions importing electric power at excessive prices. In addition, costs may be saved by rational energy utilization consisting above all in the application of dual-purpose power plants and by the rationalization of network infrastuctures. The study abstracted is part of a research project of the Federal Research Institute for Land Studies and Planning. The project is dealing with concepts of decentralized electric power supply and space heating. It adds to already existing related studies which deal above all with the basic problems of scheduling and planning the contents and inner structure of decentralized energy concepts.

  15. Deregulation of ESI and privatization of state electric utilities in Thailand

    International Nuclear Information System (INIS)

    Chirarattananon, Surapong; Nirukkanaporn, Supattana

    2006-01-01

    In Thailand, electric supply services have all been taken over by the state and operated under state enterprises since 1968. Under a law empowering its monopoly, state utilities accumulated assets and built up their manpower to expand and operate the power system to serve the whole country. During the time of high growth in power demand in early the1990 s, the government initiated a move to privatize state electric utilities, the pace of which was firmed up after 1997, the year of the financial crash. Engagement of independent power producers (IPPs) through the use of long-term power purchase agreements (PPAs) for supply of electric power into the system operated by state electric utilities was also initiated from the mid 1990s. Total capacity of IPPs and Small Power Producers (SPPs) that sell excess power from cogeneration on to the system) rose and by the late 1990s started to create a constraint on system economic dispatch. In 1999 the National Energy Policy Council (NEPC) approved a recommendation of international consultants to transform the electric supply industry into a structure similar to the system in the United Kingdom. The transformation was proposed to precede corporatization and privatization of state electric utilities. The objectives of deregulation were to revoke the monopoly in ESI, to improve transparency in electricity pricing, to reduce debts of state enterprises, and to improve economic efficiency. Industry participants have voiced strong objection to the industry model proposed. With the change of market structure in UK to the New Electricity Trading Arrangement (NETA), the secretariat of NEPC also proposed a new structure similar to NETA. More acceptance from industry participants have been received for the new structure. However, it has been assumed that the proposed structure would bring improvement in system reliability, drawing investment into power generation in a manner that would be efficient. Tariff has also been expected to become

  16. Deregulation of ESI and privatization of state electric utilities in Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Surapong Chirarattananon; Supattana Nirukkanaporn [Asian Institute of Technology, Pathum Thani (Thailand). Energy Program

    2006-11-15

    In Thailand, electric supply services have all been taken over by the state and operated under state enterprises since 1968. Under a law empowering its monopoly, state utilities accumulated assets and built up their manpower to expand and operate the power system to serve the whole country. During the time of high growth in power demand in the early 1990s, the government initiated a move to privatize state electric utilities, the pace of which was firmed up after 1997, the year of the financial crash. Engagement of independent power producers (IPPs) through the use of long-term power purchase agreements (PPAs) for supply of electric power into the system operated by state electric utilities was also initiated from the mid 1990s. Total capacity of IPPs and Small Power Producers (SPPs) that sell excess power from cogeneration on to the system, rose and by the late 1990s started to create a constraint on system economic dispatch. In 1999 the National Energy Policy Council (NEPC) approved a recommendation of international consultants to transform the electric supply industry into a structure similar to the system in the United Kingdom. The transformation was proposed to precede corporatization and privatization of state electric utilities. The objectives of deregulation were to revoke the monopoly in ESI, to improve transparency in electricity pricing, to reduce debts of state enterprises, and to improve economic efficiency. Industry participants have voiced strong objection to the industry model proposed. With the change of market structure in UK to the New Electricity Trading Arrangement (NETA), the secretariat of NEPC also proposed a new structure similar to NETA. More acceptance from industry participants have been received for the new structure. However, it has been assumed that the proposed structure would bring improvement in system reliability, drawing investment into power generation in a manner that would be efficient. Tariff has also been expected to become

  17. Deregulation of ESI and privatization of state electric utilities in Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Chirarattananon, Surapong [Energy Program, Asian Institute of Technology, PO Box 4, Klong Luang, Pathum Thani 12120 (Thailand)]. E-mail: surapong@ait.ac.th; Nirukkanaporn, Supattana [Energy Program, Asian Institute of Technology, PO Box 4, Klong Luang, Pathum Thani 12120 (Thailand)

    2006-11-15

    In Thailand, electric supply services have all been taken over by the state and operated under state enterprises since 1968. Under a law empowering its monopoly, state utilities accumulated assets and built up their manpower to expand and operate the power system to serve the whole country. During the time of high growth in power demand in early the1990 s, the government initiated a move to privatize state electric utilities, the pace of which was firmed up after 1997, the year of the financial crash. Engagement of independent power producers (IPPs) through the use of long-term power purchase agreements (PPAs) for supply of electric power into the system operated by state electric utilities was also initiated from the mid 1990s. Total capacity of IPPs and Small Power Producers (SPPs) that sell excess power from cogeneration on to the system) rose and by the late 1990s started to create a constraint on system economic dispatch. In 1999 the National Energy Policy Council (NEPC) approved a recommendation of international consultants to transform the electric supply industry into a structure similar to the system in the United Kingdom. The transformation was proposed to precede corporatization and privatization of state electric utilities. The objectives of deregulation were to revoke the monopoly in ESI, to improve transparency in electricity pricing, to reduce debts of state enterprises, and to improve economic efficiency. Industry participants have voiced strong objection to the industry model proposed. With the change of market structure in UK to the New Electricity Trading Arrangement (NETA), the secretariat of NEPC also proposed a new structure similar to NETA. More acceptance from industry participants have been received for the new structure. However, it has been assumed that the proposed structure would bring improvement in system reliability, drawing investment into power generation in a manner that would be efficient. Tariff has also been expected to become

  18. Deregulation of ESI and privatization of state electric utilities in Thailand

    International Nuclear Information System (INIS)

    Surapong Chirarattananon; Supattana Nirukkanaporn

    2006-01-01

    In Thailand, electric supply services have all been taken over by the state and operated under state enterprises since 1968. Under a law empowering its monopoly, state utilities accumulated assets and built up their manpower to expand and operate the power system to serve the whole country. During the time of high growth in power demand in the early 1990s, the government initiated a move to privatize state electric utilities, the pace of which was firmed up after 1997, the year of the financial crash. Engagement of independent power producers (IPPs) through the use of long-term power purchase agreements (PPAs) for supply of electric power into the system operated by state electric utilities was also initiated from the mid 1990s. Total capacity of IPPs and Small Power Producers (SPPs) that sell excess power from cogeneration on to the system, rose and by the late 1990s started to create a constraint on system economic dispatch. In 1999 the National Energy Policy Council (NEPC) approved a recommendation of international consultants to transform the electric supply industry into a structure similar to the system in the United Kingdom. The transformation was proposed to precede corporatization and privatization of state electric utilities. The objectives of deregulation were to revoke the monopoly in ESI, to improve transparency in electricity pricing, to reduce debts of state enterprises, and to improve economic efficiency. Industry participants have voiced strong objection to the industry model proposed. With the change of market structure in UK to the New Electricity Trading Arrangement (NETA), the secretariat of NEPC also proposed a new structure similar to NETA. More acceptance from industry participants have been received for the new structure. However, it has been assumed that the proposed structure would bring improvement in system reliability, drawing investment into power generation in a manner that would be efficient. Tariff has also been expected to become

  19. Teflon/SiO2 Bilayer Passivation for Improving the Electrical Reliability of Oxide TFTs Fabricated Using a New Two-Photomask Self-Alignment Process

    Science.gov (United States)

    Fan, Ching-Lin; Shang, Ming-Chi; Li, Bo-Jyun; Lin, Yu-Zuo; Wang, Shea-Jue; Lee, Win-Der; Hung, Bohr-Ran

    2015-01-01

    This study proposes a two-photomask process for fabricating amorphous indium–gallium–zinc oxide (a-IGZO) thin-film transistors (TFTs) that exhibit a self-aligned structure. The fabricated TFTs, which lack etching-stop (ES) layers, have undamaged a-IGZO active layers that facilitate superior performance. In addition, we demonstrate a bilayer passivation method that uses a polytetrafluoroethylene (Teflon) and SiO2 combination layer for improving the electrical reliability of the fabricated TFTs. Teflon was deposited as a buffer layer through thermal evaporation. The Teflon layer exhibited favorable compatibility with the underlying IGZO channel layer and effectively protected the a-IGZO TFTs from plasma damage during SiO2 deposition, resulting in a negligible initial performance drop in the a-IGZO TFTs. Compared with passivation-free a-IGZO TFTs, passivated TFTs exhibited superior stability even after 168 h of aging under ambient air at 95% relative humidity. PMID:28788026

  20. Teflon/SiO₂ Bilayer Passivation for Improving the Electrical Reliability of Oxide TFTs Fabricated Using a New Two-Photomask Self-Alignment Process.

    Science.gov (United States)

    Fan, Ching-Lin; Shang, Ming-Chi; Li, Bo-Jyun; Lin, Yu-Zuo; Wang, Shea-Jue; Lee, Win-Der; Hung, Bohr-Ran

    2015-04-13

    This study proposes a two-photomask process for fabricating amorphous indium-gallium-zinc oxide (a-IGZO) thin-film transistors (TFTs) that exhibit a self-aligned structure. The fabricated TFTs, which lack etching-stop (ES) layers, have undamaged a-IGZO active layers that facilitate superior performance. In addition, we demonstrate a bilayer passivation method that uses a polytetrafluoroethylene (Teflon) and SiO₂ combination layer for improving the electrical reliability of the fabricated TFTs. Teflon was deposited as a buffer layer through thermal evaporation. The Teflon layer exhibited favorable compatibility with the underlying IGZO channel layer and effectively protected the a-IGZO TFTs from plasma damage during SiO₂ deposition, resulting in a negligible initial performance drop in the a-IGZO TFTs. Compared with passivation-free a-IGZO TFTs, passivated TFTs exhibited superior stability even after 168 h of aging under ambient air at 95% relative humidity.