  1. The status of the LANSCE refurbishment project (LANSCE-R)

    International Nuclear Information System (INIS)

    Erickson, John Leonard; Jones, Kevin; Streve, Michael

    2008-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

  2. Systems engineering aspects to installation of the phased multi-year LANSCE-refurbishment project

    International Nuclear Information System (INIS)

    Pieck, Martin; Erickson, John E.; Gulley, Mark S.; Jones, Kevin W.; Rybarcyk, Larry J.

    2009-01-01

    The LANSCE Refurbishment Project (LANSCE-R) is a phased, multiyear project. The project is scheduled to start refurbishment in the 2nd quarter of fiscal year 2011. Closeout will occur during the 4th quarter of FY2016. During the LANSCE-R project, installation of project components must be scheduled during six annual 6-month maintenance-outages and not conflict with annual LANSCE operational commitments to its user facilities. The project and operations schedules must be synchronized carefully. Therefore, the scheduled maintenance outages, functional testing (with beam off, by primarily project personnel) and commissioning (with beam on, by primarily Accelerator Operation Technology (AOT) personnel) must be managed to accommodate operation. Active and effective coordination and communication between the project and AOT personnel must be encouraged to identify, as early as possible, any operational issues. This paper will report on the systems engineering approach to the integration and control of engineering activities.

  3. Project Plan Remote Target Fabrication Refurbishment Project

    International Nuclear Information System (INIS)

    Bell, Gary L.; Taylor, Robin D.

    2009-01-01

    was received in July 2009 under the Remote Target Fabrication Refurbishment Task of the Enhanced Utilization of Isotope Facilities project (Project Identification Code 2005230) funded by the American Recovery and Reinvestment Act of 2009. The goal of this project is to recover the capability to produce 4-5 curium targets for the irradiation period starting with HFIR cycle 427, currently scheduled to begin 2/17/10. Assuming success, the equipment would then be used to fabricate 6-7 additional targets to hold for the next irradiation campaign specified by the program. Specific objectives are the return to functionality of the Cubicle 3 Pellet Fabrication Line; Cubicle 2 Target Assembly equipment; and Cubicle 1 Target Inspection and Final Assembly system.

  4. Current status of JMTR refurbishment project

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Niimi, Motoji; Hori, Naohiko; Takahashi, Kunihiro; Kanno, Masaru; Nakagawa, Tetsuya; Nagao, Yoshiharu; Ishihara, Masahiro; Kawamura, Hiroshi

    2010-02-01

    The JMTR is a light water moderated and cooled, beryllium reflected tank- type reactor using LUE silicide plate-type fuels. Its thermal power is 50 MW, maximum thermal and fast neutron flux is 4x10 18 m -2 s -1 . First criticality was achieved in March 1968, and its operation was stopped from August, 2006 for the refurbishment. The refurbishment is scheduled from the beginning of FY2007 to the end of FY2010. The renewed and upgraded JMTR will be re-started from FY2011. An investigation on aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, etc., and for tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out at the beginning of FY2007. As a result, some components were decided to replace from viewpoints of future maintenance and improvement of reliability, and some components or structures were decided to repair. A visual inspection of inner side of the pressure vessel was carried out using an underwater camera in FY2008, and no serious damage was observed. Up to now, refurbishment works are in progress according to the planned schedule. In FY2009, motors of primary cooling pumps, secondary cooling pumps, motors of drain pumps, pump in the primary water transfer line to the water purification system, beryllium reflector frame, low-voltage motor control centers are to be replaced. A nuclear instrumentation system, process control system, safety protection system and so on are to be replaced in FY2010. In this paper, current status of JMTR refurbishment project is presented. (author)

  5. I and C systems refurbishment projects for plant life extension

    International Nuclear Information System (INIS)

    Andrashov, A.A.; Sklyar, V.V.; Siora, A.A.

    2012-01-01

    This paper describes the approach to implementation of Nuclear Power Plants (NPPs) Instrumentation and Control (I and C) systems refurbishment projects using Field Programmable Gate Array (FPGA)-based platform. The analysis identifying advantages of refurbishment projects for NPPs is performed. The main goals of the utilities with respect to refurbishment of NPPs I and C systems are outlined. The advantages of FPGA technology application for NPP I and C systems are described. Regulatory framework of FPGA technology for NPPs I and C systems is presented. General principles which may be used for implementation of NPPs I and C system refurbishment projects are presented. The experience of Research and Production Corporation (RPC) Radiy in implementation of NPPs I and C system refurbishment projects is considered. (author)

  6. Overview of refurbishment project of JMTR

    Energy Technology Data Exchange (ETDEWEB)

    Izumo, Hironobu; Hori, Naohiko; Kaminaga, Masanori; Kusunoki, Tsuyoshi; Ishihara, Masahiro; Komori, Yoshihiro; Suzuki, Masahide; Kawamura, Hiroshi [Japan Atomic Energy Agency, Oarai Research and Development Center, Oarai, Ibaraki (Japan)

    2012-03-15

    The refurbishment project of the JMTR from the beginning of JFY 2007 was promoted with two subjects; the one is the replacement of reactor components, and the other is the construction of new irradiation facilities. On the replacement of reactor components, an investigation on aged components (aged-investigation) was carried out, for concrete structures, tanks, tubes in order to identify their integrity. After the investigation, some components were decided to replace from viewpoints of future maintenance and improvement of reliability. On the construction of new irradiation facilities, corresponding to the user's irradiation request, new irradiation facilities, such as irradiation test facilities and equipments for LWRs materials/fuels, were installed in the JMTR. Furthermore, in June 2010, 'birth of the nuclear techno-park with the JMTR' was selected by Japanese Government. The new project is to install new irradiation facilities, such as irradiation facility and equipments for Mo-99 production and PIE equipments to JMTR until JFY2012. The New JMTR will be utilized fully by wide fields of users. Moreover, the JMTR will also contribute the promotion on research and development of the nuclear energy from basic to applied fields as an internationally utilized facility under the international/Asian network collaborations. (author)

  7. Gentilly-2 refurbishment pre-project

    International Nuclear Information System (INIS)

    Pageau, Rene; Doyon, Martial; Rheaume, M.R.

    2002-01-01

    The conceptual design life of Gentilly-2 station is 30 years and the station was put in service in 1982. Hydro-Quebec has initiated a project to assess the refurbishment of the station in the horizon 2008-2010 and for an expected life extension of 25 years. The reactor has been successfully operated since its first full-power operation in early 80's, nearly 20 years ago. Although the overall performance of Gentilly-2 continues to be very good, it is reasonable to expect that age-related degradation of key plant components will have an increasing impact on operations as the plant continues to age. The replacement of the reactor channels component is required around 2008-2009. The replacement of the reactor tubes is a major activity and it is necessary to assess the capability of the station to operate safely and reliably for a an extended period of 25 years bringing the design life of the station to over 50 years. The challenges associated with extended life operation until at least 2030-33 horizon are to maintain the margin of safety for plant operations by ensuring reliability of safety-related systems, to reduce plant unavailability due to age-related component failures, and to minimize the costs for repairs and replacement of aging components. As shown on the next figure, the overall project is expected to spread over an 8 years period starting in 2001. A project feasibility study (phase-1) of four (4) years has been planned to assess the plant condition and to make an overall safety review. This project phase will confirm the economical viability of extended operation. A period of thirty-nine (39) months would be necessary for the procurement and manufacturing of all the reactor components, and for the engineering work related to safety and economic improvements. Reactor channel replacement is planned for an outage not exceeding 18 months. (author)

  8. Utility-vendor partnerships for refurbishment projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, G.; Hall, H. [Bruce Power, Tiverton, Ontario (Canada)

    2012-07-01

    closely with our Vendor community to ensure that our policies, programs and procedures are rigorous, transparent and well understood such that these requirements can be implemented in a timely and cost effective manner. At Bruce Power we value the skills and products that our Vendor community brings to our business and it is our intention to work carefully through this process to ensure that we collectively achieve the quality level required to ensure safe, reliable operation of our plants. In the context of Utility – Vendor Partnerships from a commercial perspective; Bruce Power has established a Vendor Performance Management System (VPMS) to support a structured approach to identify supplier strengths and weaknesses and to assist in the selection and management of our vendor base. Utilizing field initiated Station Condition Reports (SCR’s) and Non Conformance Reports (NCR’s) to establish good, average and substandard performance data points by commodity and contract, the VPMS facilitates data mining of performance information to establish a profile of how a supplier performs. SCR’s and NCR’s are backstopped by commercially generated SCAR Supplier Corrective Action Reports which allows Bruce Power to monitor vendor corrective actions.The VPMS approach permits Bruce Power to have a data based evaluation vs. an opinion based performance scorecard. Although in it’s preliminary stages this system will eventually help Bruce Power verify by commodity how vendors are performing which will in turn allow Bruce Power to enable an exit strategy for a poor performing vendor while strategically developing vendors to fill identified gaps. This capability will act as a cornerstone segment in our approach to Utility – Vendor Partnerships for Refurbishment by establishing performance data points on cost, quality and schedule delivery. Our success in being able to strategically apply this model will depend upon stable outage, generation and capital improvement plans as well

  9. Utility-vendor partnerships for refurbishment projects

    International Nuclear Information System (INIS)

    Newman, G.; Hall, H.

    2012-01-01

    closely with our Vendor community to ensure that our policies, programs and procedures are rigorous, transparent and well understood such that these requirements can be implemented in a timely and cost effective manner. At Bruce Power we value the skills and products that our Vendor community brings to our business and it is our intention to work carefully through this process to ensure that we collectively achieve the quality level required to ensure safe, reliable operation of our plants. In the context of Utility – Vendor Partnerships from a commercial perspective; Bruce Power has established a Vendor Performance Management System (VPMS) to support a structured approach to identify supplier strengths and weaknesses and to assist in the selection and management of our vendor base. Utilizing field initiated Station Condition Reports (SCR’s) and Non Conformance Reports (NCR’s) to establish good, average and substandard performance data points by commodity and contract, the VPMS facilitates data mining of performance information to establish a profile of how a supplier performs. SCR’s and NCR’s are backstopped by commercially generated SCAR Supplier Corrective Action Reports which allows Bruce Power to monitor vendor corrective actions.The VPMS approach permits Bruce Power to have a data based evaluation vs. an opinion based performance scorecard. Although in it’s preliminary stages this system will eventually help Bruce Power verify by commodity how vendors are performing which will in turn allow Bruce Power to enable an exit strategy for a poor performing vendor while strategically developing vendors to fill identified gaps. This capability will act as a cornerstone segment in our approach to Utility – Vendor Partnerships for Refurbishment by establishing performance data points on cost, quality and schedule delivery. Our success in being able to strategically apply this model will depend upon stable outage, generation and capital improvement plans as well

  10. Radiation protection aspects of AECL's retube/refurbishment projects

    International Nuclear Information System (INIS)

    Zhuang, Y.; Boss, C.R.; Pontikakis, N.

    2007-01-01

    In contrast to the construction of a new nuclear reactor, Retube/Refurbishment of nuclear reactors that have been in operation for many years will involve fabrication of a new core in a radiation environment. Careful planning of the radiation protection (RP) program is crucial to ensure the protection of workers and the environment, and the success of the projects. This paper describes the key RP activities currently underway in AECL's Retube/Refurbishment projects, covering RP during retubing tooling and system designs, retubing work planning, retubing operation, and waste transfer and management. The discussion will focus on RP initiatives from engineering design aspects of the projects. (author)

  11. Analysis of Factors Influencing Building Refurbishment Project Performance

    Science.gov (United States)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  12. Analysis of Factors Influencing Building Refurbishment Project Performance

    Directory of Open Access Journals (Sweden)

    Ishak Nurfadzillah

    2018-01-01

    Full Text Available Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project’s performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs and complexity factors (CFs during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  13. Refurbishment decision support tools review—Energy and life cycle as key aspects to sustainable refurbishment projects

    International Nuclear Information System (INIS)

    Ferreira, Joaquim; Pinheiro, Manuel Duarte; Brito, Jorge de

    2013-01-01

    Europe is facing one of its most challenging crises since Great Depression and the construction sector is one of the worst affected. Refurbishment is therefore often suggested as one of the most useful solutions for the current real estate crisis in consolidated areas like the EU. On the other hand, it is imperative to construct buildings according to sustainable principles regarding economic, environmental and social issues. Therefore, proper decision-support methods are needed to help designers, investors and policy makers to choose the most sustainable solution for a refurbishment project, especially for energy retrofit works. This paper reviews the works relating to sustainable refurbishment decision-support tools which have already been developed. For this purpose we have analysed and classified 40 different methods, with particular focus on their main common aims. They are also compared with other classifications proposed. This paper further highlights the role of energy as a driving factor and discusses what other research developments are needed to create related tools for the future that could respond to actual construction requirements. - Highlights: • Sustainable refurbishment as an important challenge. • Proper decision-support methods are needed to refurbishment. • The paper reviews 40 different methods, focusing their main common aims. • The paper highlights the role of the energy as key factor to search sustainability. • It also stresses the importance of life cycle approach in refurbishment projects

  14. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  15. The influences of attributes, skills and knowledge of managers on refurbishment project performance

    Science.gov (United States)

    Ishak, Nurfadzillah

    2018-02-01

    Recently, the momentum on the growth of national building industry shows the increasing of the demand in refurbishment works becomes a trend spreading over the Malaysia. However, the potential of these activities normally related with the complexity in technical aspect compared to new build schemes. It will be reflecting on the unsatisfactory project performance. A competent manager is required to have the appropriate attributes, skills and knowledge in able to perform all the duties associated with managing the refurbishment building projects. Therefore, this paper is to identify the most appropriate attributes, skills and knowledge that required for managers to indicate the relationship between the influences on the refurbishment projects performance. This finding is indicate the importance of development the personal attributes, skills, and knowledge of managers and adds as benefit of raising the profile and image of managers in refurbishment building industry through a dissemination of the findings.

  16. Application of the ALARP principle to a major refurbishment project at Sellafield

    International Nuclear Information System (INIS)

    Hendrickson, W.R.; Coates, R.

    1989-01-01

    A formalised structured approach to the ALARP principle has been developed and is being applied to occupational radiation exposure on a major refurbishment project at Sellafield. The processes consider the conceptual and subsequent detailed design stages, planning and operational control and incorporates a dose feedback and review system. The approach has led to significant dose savings so far on the project, with recorded doses being significantly less than the doses estimated at the preliminary assessment stage. (author)

  17. The Efficacy of Waste Management Plans in Australian Commercial Construction Refurbishment Projects

    Directory of Open Access Journals (Sweden)

    Mary Hardie

    2012-11-01

    Full Text Available Renovation and refurbishment of the existingcommercial building stock is a growing area oftotal construction activity and a significantgenerator of waste sent to landfill in Australia. Awritten waste management plan (WMP is awidespread regulatory requirement forcommercial office redevelopment projects. Thereis little evidence, however, that WMPs actuallyincrease the quantity of waste that is ultimatelydiverted from landfill. Some reports indicate anabsence of any formal verification or monitoringprocess by regulators to assess the efficacy ofthe plans. In order to gauge the extent of theproblem a survey was conducted of twenty fourconsultants and practitioners involved incommercial office building refurbishment projectsto determine the state of current practice withregard to WMPs and to elicit suggestions withregard to ways of making the process moreeffective. Considerable variation in commitmentto recycling policies was encountered indicatinga need to revisit waste minimisation practices ifthe environmental performance of refurbishmentprojects is to be improved.

  18. LANSCE-R WIRE-SCANNER ANALOG FRONT-END ELECTRONICS

    International Nuclear Information System (INIS)

    Gruchalla, Michael E.

    2011-01-01

    A new AFE is being developed for the new LANSCE-R wire-scanner systems. The new AFE is implemented in a National Instruments Compact RIO (cRIO) module installed a BiRa 4U BiRIO cRIO chassis specifically designed to accommodate the cRIO crate and all the wire-scanner interface, control and motor-drive electronics. A single AFE module provides interface to both X and Y wire sensors using true DC coupled transimpedance amplifiers providing collection of the wire charge signals, real-time wire integrity verification using the normal dataacquisition system, and wire bias of 0V to +/-50V. The AFE system is designed to accommodate comparatively long macropulses (>1ms) with high PRF (>120Hz) without the need to provide timing signals. The basic AFE bandwidth is flat from true DC to 50kHz with a true first-order pole at 50kHz. Numeric integration in the cRIO FPGA provides real-time pulse-to-pulse numeric integration of the AFE signal to compute the total charge collected in each macropulse. This method of charge collection eliminates the need to provide synchronization signals to the wire-scanner AFE while providing the capability to accurately record the charge from long macropulses at high PRF.

  19. Fatigue load considerations and use of high efficiency materials in the nuclear refurbishment projects: a structural engineering perspective

    Energy Technology Data Exchange (ETDEWEB)

    Mohee, F. M., E-mail: fmm_p@yahoo.com [Univ. of Waterloo, ON (Canada)

    2014-07-01

    For the Darlington refurbishment project in Canada, fatigue load consideration is a very crucial component in the analysis and design of different structures in the nuclear facilities. New and innovative structural materials having much higher ultimate tensile strength and modulus of elasticity, that are free from corrosion, should be considered along with fatigue load during the analysis and design of the nuclear refurbishment projects. The structural analysis should include beam, column and slabs, vibrating, rotating and crane supporting structures, robotic structures, pipe supports, Serapid chain and associated automated gate structures, flask supporting structures, processing unit and lidding unit support structures. (author)

  20. Project Experiences in Research Reactor Ageing Management, Modernization and Refurbishment. Report of a Technical Meeting on Research Reactor Ageing Management, Modernization and Refurbishment

    International Nuclear Information System (INIS)

    2014-08-01

    Research reactors have played an important role in several scientific fields for around 60 years: in the development of nuclear science and technology; in the valuable generation of radioisotopes for various applications; and in the development of human resources and skills. Moreover, research reactors have been effectively utilized to support sustainable development in more than 60 countries worldwide. More than half of all operating research reactors are now over 40 years old, with many exceeding their originally conceived design life. The majority of operating research reactors face challenges due to the negative impacts of component and system ageing, which manifest in a number of forms. This situation was highlighted by a serious medical isotope supply crisis which peaked in mid-2010, when several major producing reactors underwent prolonged shutdowns due to extensive necessary overhauls of various systems. Several facilities have established a proactive systematic approach to managing ageing or mitigating its impact on safety and availability of isotopes. Others have tried to prevent or remedy the drawbacks of ageing on a case by case basis. Overall, a large body of knowledge related to ageing issues exists in many Member States. Collecting and sharing this information within the research reactor community can provide a solid foundation to develop a more systematic approach — that is, an ageing management programme to prevent negative consequences of ageing on the safety, and the operability and lifetime of operating, or even future, reactors. It may also help organizations to manage research reactors that have been in an extended shutdown state by ensuring that any required systems are operated and maintained in a safe manner prior to final decommissioning and disposal of fuel to safe storage facilities. Sharing experiences from projects undertaken to refurbish or replace equipment and systems, satisfy safety and regulatory requirements, improve

  1. Project Experiences in Research Reactor Ageing Management, Modernization and Refurbishment. Report of a Technical Meeting on Research Reactor Ageing Management, Modernization and Refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-08-15

    Research reactors have played an important role in several scientific fields for around 60 years: in the development of nuclear science and technology; in the valuable generation of radioisotopes for various applications; and in the development of human resources and skills. Moreover, research reactors have been effectively utilized to support sustainable development in more than 60 countries worldwide. More than half of all operating research reactors are now over 40 years old, with many exceeding their originally conceived design life. The majority of operating research reactors face challenges due to the negative impacts of component and system ageing, which manifest in a number of forms. This situation was highlighted by a serious medical isotope supply crisis which peaked in mid-2010, when several major producing reactors underwent prolonged shutdowns due to extensive necessary overhauls of various systems. Several facilities have established a proactive systematic approach to managing ageing or mitigating its impact on safety and availability of isotopes. Others have tried to prevent or remedy the drawbacks of ageing on a case by case basis. Overall, a large body of knowledge related to ageing issues exists in many Member States. Collecting and sharing this information within the research reactor community can provide a solid foundation to develop a more systematic approach — that is, an ageing management programme to prevent negative consequences of ageing on the safety, and the operability and lifetime of operating, or even future, reactors. It may also help organizations to manage research reactors that have been in an extended shutdown state by ensuring that any required systems are operated and maintained in a safe manner prior to final decommissioning and disposal of fuel to safe storage facilities. Sharing experiences from projects undertaken to refurbish or replace equipment and systems, satisfy safety and regulatory requirements, improve

  2. Point Lepreau refurbishment project programmable digital comparator (PDC) replacement for SDS1 and SDS2

    International Nuclear Information System (INIS)

    Ichiyen, N.M.; Chan, D.; Thompson, P.D.

    2003-01-01

    NB Power is tentatively planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) starting in April 2007. The scope of the outage was determined from the outcome of a two year study (Phase 1) involving a detailed condition assessment of the station which examined issues relating to ageing and obsolescence, along with a detailed review of Safety and Licensing issues associated with extended operation. In order to minimize schedule and regulatory risk for the Refurbishment project, pre-project work was initiated in early 2002. This program is called Phase 2 ESA (Early Start Activities). As part of the Phase 1 assessments it was concluded that replacement of the PDCs (Programmable Digital Comparators) for both shutdown systems was required in order to ensure operation of the plant for a further 25-30 years. Critical tasks were identified related to PDC replacement as part of the Phase 2 ESA program. This paper describes the activities that have taken place in the Phase 2 ESA program as well as the plan for future work for the PDC replacement for SDS 1 (Shutdown System Number One) and SDS2 (Shutdown System Number Two). (author)

  3. Refurbishment programs

    International Nuclear Information System (INIS)

    Irish, C.S.

    2004-01-01

    As nuclear plants age, equipment becomes obsolete, outdated or just simply unreliable. This puts a lot of emphasis on replacement of the subject equipment. This can be an expensive proposition for safety related equipment due to design changes, requalification charges and the cost of the new equipment, specifically when the original component is obsolete. The presentation will explain how comprehensive refurbishment programs on many different types of equipment can alleviate this situation. The refurbishment program is a systematic refurbishment of equipment to an as new condition by replacing all of the age sensitive components within the equipment. This is carried out on all of the same type of equipment in a scheduled program. For example the plant may to decide to refurbish all of their Lambda LME-24 power supplies, or all of their Bailey modules, or all of their Agastat DSC Series relays. Independent of the item the process is the same. Refurbish each piece of equipment to an as new condition by replacing all of the age sensitive equipment. The equipment is then returned to the client as safety related, existing qualification maintained and with a new service life/warranty. This is not a simple repair. It is a planned refurbishment to an as new condition of certain equipment types throughout the plant and then carried out from equipment piece to equipment piece. The refurbishment program may even include introducing new spares into the plant. This is normally performed by upgrading (dedicating for safety related use and refurbishing to an 'as new' condition) surplus equipment and using these equipment pieces in the rotation of the plant equipment to refurbish the entire population of a selected piece of equipment at the plant. This process can be performed on many equipment types including power supplies, circuit boards, modules, relays, motors, breakers, and many more. The refurbishment program greatly increases the reliability of the equipment without the

  4. LECA refurbishment project or how to get ready for the next ten years

    Energy Technology Data Exchange (ETDEWEB)

    Boussard, Francois; Bois, Dominique; Blanc, Jean Yves

    2005-01-01

    Around 1995, CEA decided a strategy for its hot laboratories: Closing LAMA - Grenoble and LHA - Saclay, after RM2 - Fontenay-aux-Roses. Refurbishing and gathering irradiated material studies in LECI - Saclay. Refurbishing LECA - Cadarache for irradiated fuel examinations. Reprocessing pilot experiments being located in Atalante - Marcoule. Started up in 1964, LECA has got an exploitation license up to August 2005. In 2001, safety authorities agreed to extend it up to 2015, provided an extensive refurbishment is undertaken which includes civil engineering works to achieve the building earthquake resistance, based on 3D-computations and withstanding maximum historically likely earthquake, improving confinement by decontaminating, adding steel boxes inside cells, changing ventilation system and creating a mobile upper cell on the cell roof, changing power supplies, shielded glasses and most manipulators, improving travelling crane, fire protection, radioactivity monitoring and alarms, installing a new device for characterizing and evacuating wastes, decreasing the fissile mass stored inside the facility (source term). Most of the work should be ended by the end of 2005. Afterwards five cells, which do not withstand earthquake, will be deconstructed within 3 years. By mid 2004, 60 % of tasks are completed and all contracts are awarded. The total final cost is 97 M Euro, 80% of which regarding the only LECA refurbishment. (Author)

  5. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Directory of Open Access Journals (Sweden)

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  6. Refurbishment of hydropower generation plants

    International Nuclear Information System (INIS)

    Kofler, W.

    2001-01-01

    This article presents the factors taken into consideration and the methods used for the management of refurbishment work in the hydropower installations of the TUWAG - a Tyrolean hydropower company in Austria. The technical and financial advantages to be gained from refurbishment are discussed and the requirements placed on the structuring of refurbishment projects are described. Various factors such as plant operation and maintenance, increased returns through better efficiency and cost reduction through lower wear and tear and reduced risk of failure are discussed. Annexes to the article cover monitoring and measurement techniques, the simulation of mechanical and hydraulic conditions, profitability calculations and turbine management

  7. Computer Refurbishment

    International Nuclear Information System (INIS)

    Ichiyen, Norman; Chan, Dominic; Thompson, Paul

    2004-01-01

    The major activity for the 18-month refurbishment outage at the Point Lepreau Generating Station is the replacement of all 380 fuel channel and calandria tube assemblies and the lower portion of connecting feeder pipes. New Brunswick Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc.). This would allow for an additional 25 to 30 years. Among the systems to be replaced are the PDC's for both shutdown systems. Assessments have been completed for both the SDS1 and SDS2 PDC's, and it has been decided to replace the SDS2 PDCs with the same hardware and software approach that has been used successfully for the Wolsong 2, 3, and 4 and the Qinshan 1 and 2 SDS2 PDCs. For SDS1, it has been decided to use the same software development methodology that was used successfully for the Wolsong and Qinshan called the I A and to use a new hardware platform in order to ensure successful operation for the 25-30 year station operating life. The selected supplier is Triconex, which uses a triple modular redundant architecture that will enhance the robustness/fault tolerance of the design with respect to equipment failures

  8. Point Lepreau Refurbishment Project. Programmable digital comparator (PDC) replacement for SDS1 and SDS2 - update 1

    International Nuclear Information System (INIS)

    Fraser, K.G.; Ichiyen, N.M.; Condor, A.E.; Thompson, P.D.

    2005-01-01

    NB Power is tentatively planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station starting in April 2008. The scope of the outage was determined from the outcome of a two year study (Phase 1) involving a detailed condition assessment of the station which examined issues relating to ageing and obsolescence, along with a detailed review of Safety and Licensing issues associated with extended operation. In order to minimize schedule and regulatory risk for the Refurbishment project, pre-project work was initiated in early 2002. This program is called Phase 2 ESA (Early Start Activities). As part of the Phase 1 assessments it was concluded that replacement of the Programmable Digital Comparators for both shutdown systems was required in order to ensure operation of the plant for a further 25-30 years. Critical tasks were identified related to PDC replacement as part of the Phase 2 ESA program. This paper describes the progress of the Phase 2 ESA program as well as the planned future (Phase 2) work for the PDC replacement for both shutdown systems. (author)

  9. Foundation helps refurbish buildings

    International Nuclear Information System (INIS)

    Camenzind, B.

    2006-01-01

    This article looks at the activities of the Swiss 'Climate-Cent' foundation, which is helping support the energetic refurbishment of building envelopes. The conditions which have to be fulfilled to receive grants are explained. Work supported includes the replacement of windows and the insulation of roofs and attics as well as outside walls. Details on the financial support provided and examples of projects supported are given. The source of the finance needed to provide such support - a voluntary levy on petrol - and further support provided in certain Swiss cantons is commented on

  10. Sustainability Potentials of Housing Refurbishment

    Directory of Open Access Journals (Sweden)

    Behzad Sodagar

    2013-03-01

    Full Text Available The benefits of choosing refurbishment over new build have recently been brought into focus for reducing environmental impacts of buildings. This is due to the fact that the existing buildings will comprise the majority of the total building stocks for years to come and hence will remain responsible for the majority of greenhouse gas emissions from the sector. This paper investigates the total potentials of sustainable refurbishment and conversion of the existing buildings by adopting a holistic approach to sustainability. Life Cycle Assessment (LCA and questionnaires have been used to analyse the environmental impact savings (Co2e, improved health and well-being, and satisfaction of people living in refurbished homes. The results reported in the paper are based on a two year externally funded research project completed in January 2013.

  11. Laser based refurbishment of steel mill components

    CSIR Research Space (South Africa)

    Kazadi, P

    2006-03-01

    Full Text Available Laser refurbishment capabilities were demonstrated and promising results were obtained for repair of distance sleeves, foot rolls, descaler cassette, idler rolls. Based on the cost projections and the results of the in-situ testing, components which...

  12. Possible refurbishment of Point Lepreau

    International Nuclear Information System (INIS)

    White, R.M.; Groom, S.H.; Thompson, P.D.; Barclay, J.M.; Allen, P.J.

    2001-01-01

    In February 2000, the NB Power Board of Directors approved Phase one of a project to produce a business case including a detailed scope and estimate associated with the possible refurbishment of the Point Lepreau Generating Station (PLGS). The Preliminary plan for refurbishment projects an 18-month outage starting as early as the spring of 2006. If the station were to be refurbished, then it would be run for another 25 to 30 years. The decision on whether or not to refurbish PLGS has not been made and is not expected until the summer of 2002. The results of the first phase of the project will be used to prepare a detailed business case that will be presented to the NB Power board of directors in January of 2002. At that time a decision will be made as to whether to refurbish the unit, or obtain other means of replacing the energy produced by PLGS. The station currently produces about a third of the power generated within the province. If the business case is approved, all-380 Pressure Tubes and Calandria Tubes, along with their related End Fittings and Feeders would be replaced. This material would be stored in new storage vaults to be constructed at the existing on-site Waste Management Facility. Replacement of other station components will be performed as required, as determined from the results of a comprehensive Plant Condition Assessment. The condition assessments build on work done under the Plant Life Management Program. Point Lepreau Generating Station has operated well since start of commercial operation in early 1983. With a lifetime capacity factor of about 84% (up to the end of 2000), it has proven to be an economic and environmentally sound electricity provider. The station has also had a significant positive economic impact in Southern New Brunswick, employing over 600 people. However the Pressure Tubes and Feeders are nearing the point in time in which they will exceed their fitness for service criteria. Although tubes can be replaced on an

  13. Possible refurbishment of Point Lepreau

    International Nuclear Information System (INIS)

    White, R.M.; Groom, S.H.; Thompson, P.D.; Barclay, J.M.; Allen, P.J.

    2001-01-01

    In February 2000, the NB Power Board of Directors approved Phase one of a project to produce a business case including a detailed scope and estimate associated with the possible refurbishment of the Point Lepreau Generating Station (PLGS). The Preliminary plan for refurbishment projects an 18-month outage starting as early as the spring of 2006. If the station were to be refurbished, then it would be run for another 25 to 30 years. The decision on whether or not to refurbish PLGS has not been made and is not expected until the summer of 2002. The results of the first phase of the project will be used to prepare a detailed business case that will be presented to the NB Power board of directors in January of 2002. At that time a decision will be made as to whether to refurbish the unit, or obtain other means of replacing the energy produced by PLGS. The station currently produces about a third of the power generated within the province. If the business case is approved, all-380 Pressure Tubes and Calandria Tubes, along with their related End Fittings and Feeders would be replaced. This material would be stored in new storage vaults to be constructed at the existing on-site Waste Management Facility. Replacement of other station components will be performed as required, as determined from the results of a comprehensive Plant Condition Assessment. The condition assessments build on work done under the Plant Life Management Program. Point Lepreau Generating Station has operated well since start of commercial operation in early 1983. With a lifetime capacity factor of about 84% (up to the end of 2000), it has proven to be an economic and environmentally sound electricity provider. The station has also had a significant positive economic impact in Southern New Brunswick, employing over 600 people. However the Pressure Tubes and Feeders are nearing the point in time in which they will exceed their fitness for service criteria. Although tubes can be replaced on an

  14. Refurbishment of the LECI

    International Nuclear Information System (INIS)

    Blanc, J. Y.; Cheron, C.

    2001-01-01

    The LECI is a hot laboratory built in Saclay in the early sixties for examinations on fuel rods, with 25 hot cells. Around 1995, a refurbishment programme up to 2004 was decided and started. It includes the renovation of about half of the cells of the existing building and the construction of a new building with about twenty lead-shielded hot cells for mechanical testing. At mid 2001, this paper presents the status of the project and the perspectives for the next years. These modifications aims: -To increase sample preparation and examination capacities on nuclear metals: mainly zirconium, steel and aluminium alloys. -To keep existing P. I. facilities on short P. W. R. fuel rod as support for ramp testing programmes in the nearby Osiris reactor and as support for new cladding development programmes. -To gather in LECI mechanical testing facilities which are up to now located in another facility to be shut down at the end of 2003. Concerning the existing building, most of the planned refurbishment has been performed and 10 cells have been cleaned and 8 of them will be reequipped at the end of 2001: a metallography line with new microscope, hardness testing, periscopes, TEM thin foil and EPMA preparation, two cells for tooling mechanical samples (milling machine, lathe, spark erosion), one cell for clad creep testing on long term storage conditions and a cell with a 250 kN tensile machine. The new building is built, the lead cells will be installed in 2002 and most of the scientific equipment have been ordered. They include: wire erosion machining 3 tensile machines with extensometry, 2 Charpy, different creep and internal pressure machines, autoclaves EPMA and Raman analysis. The schedule is to open this building to irradiated materials ( no fuel except on EPMA) at the end of 2003. Some difficulties such as the public enquires have been successfully overcome, some financial constraints have delayed the project of about one year, and technical difficulties have

  15. Reactor protection system refurbishment at Paks

    International Nuclear Information System (INIS)

    Hetzmann, A.; Turi, T.

    1997-01-01

    The history and the milestones of the reactor protection system refurbishment are outlined. During the preparation phase of the refurbishment project, detailed requirements have been set up and specific technical solutions developed. The structure of the project documents prepared during these activities is shown in a figure. The life cycle of the project was divided into four phases: the preparatory phase; the design and manufacturing phase; the installation and commissioning phase; and the operation phase. For all four Paks units a time schedule for implementation was set up. The licensing process is dealt with; the principal license was issued in June 1996. (A.K.)

  16. Waste drum refurbishment

    International Nuclear Information System (INIS)

    Whitmill, L.J.

    1996-01-01

    Low-carbon steel, radioactive waste containers (55-gallon drums) are experiencing degradation due to moisture and temperature fluctuations. With thousands of these containers currently in use; drum refurbishment becomes a significant issue for the taxpayer and stockholders. This drum refurbishment is a non-intrusive, portable process costing between 1/2 and 1/25 the cost of repackaging, depending on the severity of degradation. At the INEL alone, there are an estimated 9,000 drums earmarked for repackaging. Refurbishing drums rather than repackaging can save up to $45,000,000 at the INEL. Based on current but ever changing WIPP Waste Acceptance Criteria (WAC), this drum refurbishment process will restore drums to a WIPP acceptable condition plus; drums with up to 40% thinning o the wall can be refurbished to meet performance test requirements for DOT 7A Type A packaging. A refurbished drum provides a tough, corrosion resistant, waterproof container with longer storage life and an additional containment barrier. Drums are coated with a high-pressure spray copolymer material approximately .045 inches thick. Increase in internal drum temperature can be held to less than 15 F. Application can be performed hands-on or the equipment is readily adaptable and controllable for remote operations. The material dries to touch in seconds, is fully cured in 48 hours and has a service temperature of -60 to 500 F. Drums can be coated with little or no surface preparation. This research was performed on drums however research results indicate the coating is very versatile and compatible with most any material and geometry. It could be used to provide abrasion resistance, corrosion protection and waterproofing to almost anything

  17. Point Lepreau refurbishment: plant condition assessment

    International Nuclear Information System (INIS)

    Allen, P.J.; Soulard, M.R.; David, F.; Clefton, G.; Weeks, R.

    2001-01-01

    New Brunswick Power (NB Power) has initiated a study into the refurbishment of the Point Lepreau Generating Station, with the objective to extend plant operation another 25 to 30 years. The end product of this study will be a business case that compares the costs of refurbishing Point Lepreau with costs of alternate means of generation. The Project Execution Plan and business case are being developed by an integrated team of AECL, NB Power and subcontractor staff under the project management of AECL. The refurbishment scope will include replacement of the pressure tubes, calandria tubes and part of the feeder piping. Planning of these replacements is part of the refurbishment study work. Planning is also underway for the environmental, safety and licensing issues that would need to be addressed to ensure future operation of the unit. In addition to these studies, a systematic review of the plant has been carried out to determine what other equipment refurbishment or replacement will be required due to ageing or obsolescence of plant equipment. This Plant Condition Assessment (PCA) follows a highly structured approach to ensure consistency. This paper presents an overview of the engineering process and the main findings from the work. (author)

  18. Last PS magnet refurbished

    CERN Multimedia

    2009-01-01

    PS Magnet Refurbishment Programme Completed. The 51st and final refurbished magnet was transported to the PS on Tuesday 3 February. The repair and consolidation work on the PS started back in 2003 when two magnets and a busbar connection were found to be faulty during routine high-voltage tests. The cause of the fault was a combination of age and radiation on electrical insulation. After further investigation the decision was taken to overhaul half of the PS’s 100 magnets to reduce the risk of a similar fault. As from 20 February the PS ring will start a five-week test programme to be ready for operation at the end of March.

  19. Point Lepreau refurbishment - update 5

    International Nuclear Information System (INIS)

    White, R.M.; Eagles, E.R.; Hickman, C.N.; Baker, R.; Thompson, P.D.; Howieson, J.Q.; Ichiyen, N.

    2005-01-01

    NB Power Nuclear is planning to conduct a 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube assemblies and connecting feeder pipes. This activity is referred to as Retube. NB Power Nuclear would also take advantage of this outage to conduct a number of repairs, replacements, inspection and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc.). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope or the project was determined [mm the outcome of a two year study involving a detailed condition assessment of the station which examined Issues relating to ageing and obsolescence, along with a detailed review or Safety and Licensing issues associated with extended operation. The Refurbishment outage would be preceded by a detailed Engineering Project Phase that would: Finalize details of the Retube process including modeling, tooling development, site facilities and training of personnel. Perform necessary engineering activities related to design modifications. Construct the new waste storage structures to house Retube Waste and other additional waste storage structures for the extended life of the station. Setup necessary temporary construction facilities (offices, storage areas, change moms, decontamination an maintenance areas) to support Retube. Procure equipment and components. Perform detailed outage planning. Initiate development of detailed commissioning as well as lay-up, monitoring and return to service procedures. At the present time, the NB Power Nuclear Board of Directors and the New Brunswick Provincial government are reviewing a proposal for a lease arrangement from Bruce Power

  20. Research reactor modernization and refurbishment

    International Nuclear Information System (INIS)

    2009-08-01

    Many recent, high profile research reactor unplanned shutdowns can be directly linked to different challenges which have evolved over time. The concept of ageing management is certainly nothing new to nuclear facilities, however, these events are highlighting the direct impact unplanned shutdowns at research reactors have on various stakeholders who depend on research reactor goods and services. Provided the demand for these goods and services remains strong, large capital projects are anticipated to continue in order to sustain future operation of many research reactors. It is within this context that the IAEA organized a Technical Workshop to launch a broader Agency activity on research reactor modernization and refurbishment (M and R). The workshop was hosted by the operating organization of the HOR Research Reactor in Delft, the Netherlands, in October 2006. Forty participants from twenty-three countries participated in the meeting: with representation from Africa, Asia Pacific, Eastern Europe, North America, South America and Western Europe. The specific objectives of this workshop were to present facility reports on completed, existing and planned M and R projects, including the project objectives, scope and main characteristics; and to specifically report on: - the project impact (planned or actual) on the primary and key supporting motivation for the M and R project; - the project impact (planned or actual) on the design basis, safety, and/or regulatory-related reports; - the project impact (planned or actual) on facility utilization; - significant lessons learned during or following the completion of M and R work. Contributions from this workshop were reviewed by experts during a consultancy meeting held in Vienna in December 2007. The experts selected final contributions for inclusion in this report. Requests were also distributed to some authors for additional detail as well as new authors for known projects not submitted during the initial 2006 workshop

  1. Refurbishment of the reactor protection system at Paks NPP. The refurbishment process

    International Nuclear Information System (INIS)

    Turi, T.; Katics, B.

    1998-01-01

    The Reactor Protection System Refurbishment Project had an extensive preparation period in Paks started in 1992. During this preparation a large volume of the basic engineering tasks has been performed and as a result a contract for implementation of a three-train digital RPS on the four Units was concluded with Siemens in September, 1996. According to that contract the first refurbished Unit will be commissioned in 1999 followed by a further Unit in each succeeding year. This paper introduces the process of the refurbishment, overview of the V and V activities, introduce the architecture, summarize the main design principles and outlines the additional tasks to be performed together with the RPS design. (author)

  2. Refurbishments of RF systems

    International Nuclear Information System (INIS)

    Baelde, J.L.

    1998-01-01

    This document describes the activities of the R.F. System group during the years 1995-1996 in the frame of the refurbishment of the control system at GANIL accelerator. Modifications concerning the following sub-assemblies are mentioned: 1. voltage standards; 2. link card between the step by step motor control and the local control systems; 3. polarization system; 4. computer software for different operations. Also reported is the installation of ECR 4 source for the CO2. In this period the R2 Regrouping system has been installed, tested and put into operation. Several problems concerning the mechanical installation of the coupling loop and other problems related to the electronics operation were solved. The results obtained with the THI machine are presented

  3. Modernization and refurbishment of the Central Interim Storage

    International Nuclear Information System (INIS)

    Mele, I.; Zeleznik, N.

    2002-01-01

    The Central Interim Storage for radioactive waste in Brinje, being put into operation in 1986, needs refurbishment and modernization in order to meet the up-to-date operational and safety requirements and to ensure the normal and undisturbed acceptance of radioactive waste from small producers in the future. Because of the waste, being already stored in the storage, the lack of reprocessing capacities and the lack of auxiliary room, the refurbishment and modernization is a complex problem, which needs to be addressed with care. The plan of refurbishment and modernization requires an integral approach, covering all different aspects of renewal and reconstruction. The implementation plan, however, must be based on the actual state of the storage and real conditions for the implementations: from technical to financial. In this paper the project for refurbishment and modernization of the storage, and some activities that have already been implemented, are presented.(author)

  4. Refurbishment of industrial buildings

    International Nuclear Information System (INIS)

    Gustafsson, Stig-Inge

    2006-01-01

    When a building is subject for refurbishment, there is a golden opportunity to change its behavior as an energy system. This paper shows the importance of careful investigations of the processes, the climate shield and the heating systems already present in the building before measures are implemented in reality. A case study is presented dealing with a carpentry factory. The building is poorly insulated according to standards today, and initially it was assumed that a better thermal shield would be of vital importance in order to reach optimal conditions. Instead, it is shown that the main problem is the ordinary heating system. This uses steam from a wood chips boiler and the wood chips come from the manufacturing processes. These wood chips are, therefore, a very cheap fuel. The boiler had, during decades of use, slowly degraded into a poor state. Hence, aero-tempers using expensive electricity have been installed to remedy the situation. These use not only expensive kWh but also very expensive kW due to the electricity tariff. It is shown that electricity for heating purposes must be abandoned and further, that this could be achieved at a surprisingly small cost. By stopping a large waste of steam, it was possible to find resources, in the form of unspent money, for further mending the existing heating system. Not only economy but also environmental hazards in the form of CO 2 emissions urges us to abandon electricity and instead use heat from cheap biomass fired boilers. Such equipment saves environment at the same time it saves money

  5. Reactor refurbishment in an outage environment

    International Nuclear Information System (INIS)

    Gowthorpe, P.; Hoare, R.

    2012-01-01

    Reactor life extension has typically been performed during specific refurbishment outages. These outages are long and costly due to the sheer complexity of the scope, not to mention the ever present discovery work. A scope of this size requires a huge labour force to execute, which poses significant challenges. The work is difficult to staff with qualified people able to execute the work smoothly and managing the required labour pool problematic. Cost and time overruns are inevitable in that environment. Reducing the cost and schedule is critical to the long term viability of reactor refurbishment projects. With planning, the total cost of the refurbishment can be reduced by managing the inspection and repairs during normal outages. Identifying what activities need to be done each outage for the life of the reactor and bringing the latest technology can make this viable. Tightly planned outages with a small well trained labour force will go a long way to reducing costs. The suite of services and tooling available to the utilities to manage their reactor integrity has improved significantly in recent years and continues to evolve. New feeder inspection technologies can provide improved inspection results for the complex feeder geometry. These improvements lead to more accurate wear rates and better predictions of component life. Feeders that need replacement based on improved inspection techniques can be replaced systematically during regular outages rather than specific refurbishment outages. Targeting areas rather than entire feeders reduces time, dose and cost. In cases where feeder replacement isn't feasible or where unpredicted wear is found, a feeder weld overlay process can be used. To manage the reactor work, new data systems are under development that allow for effective tracking of each activity performed and outcomes in a single package. (author)

  6. Sustainable refurbishment of exterior walls and building facades. Final report, Part B - General refurbishment concepts

    Energy Technology Data Exchange (ETDEWEB)

    Vares, S.; Pulakka, S.; Toratti, T. [and others

    2012-11-01

    This report is the second part of the final report of Sustainable refurbishment of building facades and exterior walls (SUSREF). SUSREF project was a collaborative (small/medium size) research project within the 7th Framework Programme of the Commission and it was financed under the theme Environment (including climate change) (Grant agreement no. 226858). The project started in October 1st 2009 and ended in April 30th 2012. The project included 11 partners from five countries. SUSREF developed sustainable concepts and technologies for the refurbishment of building facades and external walls. This report together with SUSREF Final report Part B and SUSREF Final Report Part C introduce the main results of the project. Part A focuses on methodological issues. The descriptions of the concepts and the assessment results of the developed concepts are presented in SUSREF Final report part B (generic concepts) and SUSREF Final report Part C (SME concepts). The following list shows the sustainability assessment criteria defined by the SUSREF project. These are Durability; Impact on energy demand for heating; Impact on energy demand for cooling; Impact on renewable energy use potential; Impact on daylight; Environmental impact of manufacture and maintenance; Indoor air quality and acoustics; Structural stability; Fire safety; Aesthetic quality; Effect on cultural heritage; Life cycle costs; Need for care and maintenance; Disturbance to the tenants and to the site; Buildability. This report presents sustainability assessment results of general refurbishment concepts and gives recommendations on the basis of the results. The report covers the following refurbishment cases - External insulation - Internal insulation - Cavity wall insulation - Replacement Insulation during renovation.

  7. Social House Refurbishment

    OpenAIRE

    DONET CLIMENT, MARIA

    2012-01-01

    The building is located in urban Horsens on CHR. M. Østergaardsvej. Originally it was designed as part of a bigger social housing project and executed in 1956 by architect J. Broch Christensen. The project consisted of 7 very similar blocks but we are mainly focusing on block 6. The original design of the buildings was a traditional danish design with external bricks and roof tiles - all in red. Inside, the apartments were quite typical of that time. Our concept for the new building is to m...

  8. Refurbishment of the NPP Dukovany I and C System

    International Nuclear Information System (INIS)

    Karpeta, C.; Rosol, J.

    2004-01-01

    An overview of the NPP Dukovany Instrumentation and Control (I and C) refurbishment project is presented in this paper from the standpoint of both its management and technical aspects. Reasons for taking the decision to replace the original plant I and C system are outlined and the objectives set for the refurbishment project are stated. The paper is focusing on describing more in detail the first part of the refurbishment, i.e. replacement of the I and C portions of the plant systems important to nuclear safety and the process information system. This includes the reactor trip system, engineered safety features actuation system, reactor power limitation system, reactor power control system, post-accident monitoring system, reactor core monitoring system and unit data acquisition and processing system. Information is given on the main processes of the project, i.e. the bidding, design, manufacturing, installation and commissioning. Specific licensing process applied to this refurbishment project is also outlined. An account of the current status of the project implementation is given. (author)

  9. An Integrated Refurbishment Design Process to Energy Efficiency

    NARCIS (Netherlands)

    Konstantinou, T.; Knaack, U.

    2013-01-01

    Given the very low renewal rate of the building stock, the efforts to reduce energy demand must focus on the existing residential buildings. Even though awareness has been raised, the effect on energy efficiency is often neglected during the design phase of refurbishment projects. This paper

  10. Embalse refurbishment - aging, safety assessment, and the path forward

    International Nuclear Information System (INIS)

    Sainz, R.; Fornero, D.; Diaz, G.; Gold, R.; Dam, R.; McCrea, L.

    2009-01-01

    The Embalse Nuclear Power Station has been engaged in Pre-refurbishment activities for two years. The primary focus has been on the first phase Pre-Project Condition Assessment Program (PCAP). This phase of the Refurbishment and Life Extension (RLE) project consists of all preparatory activities that are required to define the refurbishment scope and costs, and for input into the utility business case for the RLE project. As part of an overall Plant Life Management (PLiM) program, the following activities have been performed: 1. Systematic and rigorous condition assessments / life assessments (including Health Prognosis and Recommendations); 2. Assessment of design and safety analysis features at Embalse, relative to current technology and licensing practices; 3. Pre-Project activities related to: Retube, Steam Generator replacement, and Digital Control Computer (DCC) replacement. The program has been a joint effort of Embalse NPS-NASA, AECL, ANSALDO and several other support organizations. Details of the planned program were addressed previously in a paper presented at the 28th CNS Conference (2007), entitled 'Embalse Refurbishment - Pre-Project Condition Assessment Phase 1'. Since that time, significant progress has been made towards completing the assessment program and planning for the next steps. This paper presents the progress of Refurbishment and Life Extension (RLE) Program at Embalse Nuclear Power Station with specific emphasis on the PCAP efforts. This includes a discussion of the benefits and lessons learned from RLE project's perspective, and an overview of some key conclusions of the aging assessments. Finally, this paper outlines the path forward. It should be noted that results of assessments presented in this paper are very conservative. This is driven largely by the fact that there are currently uncertainties in equipment condition that can be addressed through the activities recommended as an outcome of these assessments. (author)

  11. LMZ experience in refurbishment of hydroturbine equipment

    Energy Technology Data Exchange (ETDEWEB)

    Sotnikov, Anatoly A. [LMZ, St. Petersburg (Russian Federation). Div. of Hydraulic Machine

    2000-07-01

    AO LMZ experience in refurbishment of hydroturbine equipment is generalized. Hydraulic turbines of many power stations having been in service of more than 30 years need rehabilitation and modernization. As a rule, the following problems are solved in the process of refurbishment works: increase of turbine efficiency and output, ensuring of reliable operation of the equipment during the next length of life, ensuring the environmental safety of the equipment, furnishing of the power station with up to date automatic control systems. The process of refurbishment used by LMZ is described. The examples of refurbishment are given. (author)

  12. Model for Refurbishment of Heritage Buildings

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2014-01-01

    the Heritage Agency, the Danish Working Environment Authority and the owner as a team cooperated in identifying feasible refurbishments. In this case, the focus centered on restoring and identifying potential energy savings and deciding on energy upgrading measures for the listed complex. The refurbished...... with the requirements for the use of the building. The model focuses on the cooperation and dialogue between authorities and owners, who refurbish heritage buildings. The developed model was used for the refurbishment of the listed complex, Fæstningens Materialgård. Fæstningens Materialgård is a case study where...

  13. Refurbishing tritium contaminated ion sources

    International Nuclear Information System (INIS)

    Wright, K.E.; Carnevale, R.H.; McCormack, B.E.; Stevenson, T.; Halle, A. von

    1995-01-01

    Extended tritium experimentation on TFTR has necessitated refurbishing Neutral Beam Long Pulse Ion Sources (LPIS) which developed operational difficulties, both in the TFTR Test Cell and later, in the NB Source Refurbishment Shop. Shipping contaminated sources off-site for repair was not permissible from a transport and safety perspective. Therefore, the NB source repair facility was upgraded by relocating fixtures, tooling, test apparatus, and three-axis coordinate measuring equipment; purchasing and fabricating fume hoods; installing exhaust vents; and providing a controlled negative pressure environment in the source degreaser/decon area. Appropriate air flow monitors, pressure indicators, tritium detectors and safety alarms were also included. The effectiveness of various decontamination methods was explored while the activation was monitored. Procedures and methods were developed to permit complete disassembly and rebuild of an ion source while continuously exhausting the internal volume to the TFTR Stack to avoid concentrations of tritium from outgassing and minimize personnel exposure. This paper presents upgrades made to the LPIS repair facility, various repair tasks performed, and discusses the effectiveness of the decontamination processes utilized

  14. IEC 61850 based refurbishment strategies for protection and automation systems

    Energy Technology Data Exchange (ETDEWEB)

    Tholomier, D. [Areva T and D Automation Canada Inc., Monteal, PQ (Canada); Hossenlopp, L. [Areva T and D Automation Inc., Paris (France); Apostolov, A. [Omicron Electronics, Houston, TX (United States)

    2008-07-01

    Electric utilities are currently facing the challenge of refurbishing aging transmission networks and power system infrastructure at a time of severe economic, environmental and competitive constraints. This paper addressed the issue of an appropriate approach to retrofit the hardware and software of substation secondary systems, and how IEC standards could be used to set up a long term strategy. The first part of the paper considered an asset management strategy for refurbishing substation secondary systems, while the second part of the paper addressed the strategies for refurbishing existing power plants. The final section of the paper analyzed refurbishment strategies designed to protect power distribution systems. The impact of IEC 61850 and how legacy devices can be integrated in substation automation systems were discussed. It was concluded that new SCADA systems are needed to handle new technology. Additional features like remote control, remote settings, remote disturbance records analysis and remote maintenance are also needed to properly operate the power system. The value of preventive maintenance using remote monitoring systems to determine the status of all the digital electronic devices installed in substation was also discussed. IEC 61850 offers several opportunities to improve grid operation and control. It supports interoperability between protective relays and control devices from different manufacturers in the substation, which is required in order to achieve substation level interlocking, protection and control functions and improve the efficiency of microprocessor based relays applications. This technology has now passed the initial stage of implementation and several projects are underway worldwide. 13 figs.

  15. Energetic Refurbishment of Historic Brick Buildings: Problems and Opportunities

    Science.gov (United States)

    Zagorskas, Jurgis; Paliulis, Gražvydas Mykolas; Burinskienė, Marija; Venckauskaitė, Jūratė

    2013-12-01

    Building standards for energy effectiveness are increasing constantly and the market follows these changes by constructing new buildings in accordance with standards and refurbishment of the existing housing stock. Comprehensive trends in European construction market show tremendous increase in building retrofit works. It can be predicted that after the end of this decade, more than half of the construction works in European cities will be taking place in existing buildings, pushing the construction of new buildings to a less important role. Such a growth in building refurbishment works is creating a demand for suitable materials, retrofitting techniques and research. The differences between refurbishment of new-build projects and historical or valuable buildings are insufficiently recognized - mostly the buildings without further cultural preservation requirements are studied. This article covers the theme of refurbishment measures in historical buildings - the specific measures like inside insulation which are allowed due to the valuable façade or other heritage preservation requirements. An overview of other innovative methods for energy saving in existing buildings and their potential is given.

  16. Refurbishment of Point Lepreau Generating Station

    International Nuclear Information System (INIS)

    Thompson, P.D.; Jaitly, R.; Ichiyen, N.; Petrilli, M.A.

    2004-01-01

    NB Power is planning to conduct an 18-month maintenance outage of the Point Lepreau Generating Station (PLGS) beginning in April 2008. The major activity would be the replacement of all 380 Fuel Channel and Calandria Tube Assemblies and the connecting feeder pipes. This activity is referred to as Retube. NB Power would also take advantage of this outage to conduct a number of repairs, replacements, inspections and upgrades (such as rewinding or replacing the generator, replacement of shutdown system trip computers, replacement of certain valves and expansion joints, inspection of systems not normally accessible, etc). These collective activities are referred to as Refurbishment. This would allow the station to operate for an additional 25 to 30 years. The scope of the project was determined from the outcome of a two-year study involving a detailed condition assessment of the station that examined issues relating to ageing and obsolescence. The majority of the plant components were found to be capable of supporting extended operation without needing replacement or changes. In addition to the condition assessment, a detailed review of Safety and Licensing issues associated with extended operation was performed. This included a review of known regulatory and safety issues, comparison of the station against current codes and standards, and comparison of the station against safety related modifications made to more recent CANDU 6 units. Benefit cost analyses (BCA) were performed to assist the utility in determining which changes were appropriate to include in the project scope. As a Probabilistic Safety Assessment (PSA) for PLGS did not exist at the time, a risk baseline for the station had to be determined for use in the BCA. Extensive dialogue with the Canadian Nuclear Safety Commission staff was also undertaken during this phase. A comprehensive Licensing Framework was produced upon which the CNSC provided feedback to NB Power. This feedback was important in terms of

  17. Space Telescope maintenance and refurbishment

    Science.gov (United States)

    Trucks, H. F.

    1983-01-01

    The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

  18. EU Project “School of the Future”— Refurbishment of School Buildings Toward Zero Emission with High-Performance Indoor Environment

    DEFF Research Database (Denmark)

    Erhorn-Kluttig, Heike; Erhorn, Hans; Kempe, Stephan

    2016-01-01

    :•Reduction of the total energy use > factor of 3, verified through monitoring•Reduction of the heating energy use > 75%, verified through monitoring.The improvement of the indoor environment quality (air, daylight, acoustic, thermal comfort) and the associated impact on the students’ performance will be analyzed by short......, and their primary users, namely students, i.e., the next generation, are the focus of the project. The energy and indoor environment performance of four demonstration buildings in four European countries and climates have been significantly improved due to holistic retrofits of the building envelope, their service...... and on the residential sector since the students will act as communicators to their families. Training sessions specifically tailored to their needs have improved user behavior and awareness of energy efficiency and indoor environment. The success is measured by how well the retrofits meet the following goals...

  19. Industry partnership: adding value to nuclear refurbishment and maintenance

    International Nuclear Information System (INIS)

    Gibbins, T.; Bains, N.; Morikawa, D.

    2008-01-01

    The Point Lepreau Generating Station was the first CANDU 6 unit to be licensed for operation, beginning commercial operation in 1983. It is now become the first CANDU 6 to undergo full refurbishment. As part of the overall project, all 380 fuel channels and associated feeders will be removed and replaced. In order to undertake this project, it was necessary for AECL to design and develop over fifty 'first-of-a-kind tools' for fuel channel and calandria tube replacement. This paper outlines the complexity of the retube tooling project and the industry partnership strategy for the engineered tooling systems development. (author)

  20. Energetic Refurbishment of Historic Brick Buildings

    DEFF Research Database (Denmark)

    Zagorskas, Jurgis; Mykolas Paliulis, Grazvydas; Burinskiene, Marija

    2013-01-01

    Building standards for energy effectiveness are increasing constantly and the market follows these changes by constructing new buildings in accordance with standards and refurbishment of the existing housing stock. Comprehensive trends in European construction market show tremendous increase...

  1. EPIQR - a decision making tool for apartment building refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Caccavelli, D. [Centre Scientifique et Technique du Batiment, Cedex (France); Balaras, C. [National Observatory of Athens, Athens (Greece); Bluyssen, P. [TNO Building and Construction Research, Delft (Netherlands); Flourentzou, F. [Ecole Polytechnique Federale de Lausanne, Lausanne (France); Jaggs, M. [Building Research Establishment, Watford (United Kingdom); Wetzel, C. [Fraunhofer-Institut fur Bauphysik, Holzkirchen (Germany); Wittchen, K. [Danish Building Reasearch Institute, Hoersholm (Denmark)

    1999-11-01

    In a large majority of European countries, the amount of the maintenance and refurbishment works represents nearly 50% of the total amount spent in the building sector. New requirements are being added to the necessity of maintaining or re-establishing the building stock`s usage value. They are linked to the determination to reduce energy consumption, pollutant emissions, work site wastes, to improve the Indoor Environment Quality and all the modern conveniences inside apartment. Aware of this matter, the European Community has launched a two-year European research project, entitled EPIQR (Energy Performance, Indoor Environmental Quality, Retrofit) involving seven research institutions in the frame of the JOULE III programme. The purpose is to give architects and contracting authorities a multimedia tool to enable them to simultaneously grasp the whole process of apartment building refurbishment or retrofit. It has a number of functions: Assess the building`s degradation state based on a technical diagnosis after a standardised and complete inspection of the building; Prepare work proposals. These take into account not only the renovation of the building but also the improvement of the energy performance and IEQ; Estimate the costs corresponding to these works. A data base, containing the costs of 800 refurbishment works, provides a fast estimate of the total amount of the works being considered; Estimate the evolution of the degradation of the components if none of the works were to be carried out, as well as the refurbishment costs which would result. This paper provides an overview of the EPIQR methodology and the final deliverables of the project. (au)

  2. Refurbishment of JMTR pure water facility

    International Nuclear Information System (INIS)

    Asano, Norikazu; Hanakawa, Hiroki; Kusunoki, Hidehiko; Satou, Shinichi

    2012-05-01

    In the refurbishment of JMTR, facilities were classified into which (1) were all updated, (2) were partly updated, and (3) were continuance used by the considerations of the maintenance history, the change parts availability and the latest technology. The JMTR pure water facility was classified into all updated facility based on the consideration. The Update construction was conducted in between FY2007 and FY2008. The refurbishment of JMTR pure water facility is summarized in this report. (author)

  3. A State of the Art Report on the Case Study of Hot Cell Decontamination and Refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Won, H. J.; Jung, C. H.; Moon, J. K.; Park, G. I.; Song, K. C

    2008-08-15

    As the increase of the operation age of the domestic high radiation facilities such as IMEF, PIEF and DFDF, the necessity of decontamination and refurbishment of hot cells in these facilities is also increased. In the near future, the possibilities of refurbishment of hot cells in compliance with the new regulations, the reuse of hot cells for the other purposes and the decommissioning of the facilities also exist. To prepare against the decontamination and refurbishment of hot cells, the reports on the refurbishment, decommissioning and decontamination experiences of hot cells in USA, Japan, France, Belgium and Great Britain were investigated. ANL of USA performed the project on the decontamination of hot cells. The purpose of the project was to practically eliminate the radioactive emissions of Rn-220 to the environment and to restore the hot cells to an empty restricted use condition. The five hot cells were emptied and decontaminated for restricted use. Chemical processing facility in JAEA of Japan was used for the reprocessing study of spent fuels, hot cells in CPF were refurbished from 1995 for the tests of the newly developed reprocessing process. In a first stage, decommissioning and decontamination were fully performed by the remote operation Then, decommissioning and decontamination were performed manually. By the newly developed process, they reported that the radiation exposure of workers were satisfactorily reduced. In the other countries, they also make an effort for the refurbishment and decontamination of hot cells and it is inferred that they accumulate experiences in these fields.

  4. Coordination Devices in the Refurbishment Design Process: A Partial-Correlation Approach

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2009-12-01

    Full Text Available Building refurbishment is an important sector in the Malaysian construction industry. The increase the number of building renovations, alterations, extensions and extensive repair works contributed to the high demand for refurbishment projects. However, refurbishment projects are more difficult to manage compared to new-built, due to uncertainty factors inherent in the projects. Therefore, this paper identifies factors that contributed to uncertainty and shows how it affects design performance of refurbishment projects. This paper was also extended to the used of coordination devices to improve design performance from the effect of uncertainty in the projects. Partial-correlation technique was used in data analysis to check any significant moderate effects of coordination devices to control the negative effect of uncertainty on design performance of refurbishment projects. Four (4 coordination devices involved in the partial-correlation tests. The results concluded that the use of lateral relations and architect’s characteristics are most likely reducing the uncertainty of client attributes towards design completeness before work started on site.

  5. Reactor refurbishment options for a changing climate

    Energy Technology Data Exchange (ETDEWEB)

    McNeish, D. [Bruce Power, Tiverton, Ontario (Canada)

    2012-07-01

    As the industry looks ahead to another generation of reactor refurbishment, it is acknowledged that the traditional way of Retubing a reactor is a daunting prospect for our investors and stakeholders. Innovations are required to mitigate the long downtime and large one-time investment associated with previous reactor refurbishments. These can take the shape of improvements to the Retube processes or by fundamentally changing the approach, e.g., calandria/shield tank replacement or partial Retubes. This session presents technical challenges that utilities need help resolving to arrive at a more attractive reactor refurbishment model. This includes issues related to calandria vessel fitness-for-service, the fuel channel replacement process, the feeder replacement process, life extension of fuel channels and feeders and complexities involving interfacing systems. (author)

  6. Reactor refurbishment options for a changing climate

    International Nuclear Information System (INIS)

    McNeish, D.

    2012-01-01

    As the industry looks ahead to another generation of reactor refurbishment, it is acknowledged that the traditional way of Retubing a reactor is a daunting prospect for our investors and stakeholders. Innovations are required to mitigate the long downtime and large one-time investment associated with previous reactor refurbishments. These can take the shape of improvements to the Retube processes or by fundamentally changing the approach, e.g., calandria/shield tank replacement or partial Retubes. This session presents technical challenges that utilities need help resolving to arrive at a more attractive reactor refurbishment model. This includes issues related to calandria vessel fitness-for-service, the fuel channel replacement process, the feeder replacement process, life extension of fuel channels and feeders and complexities involving interfacing systems. (author)

  7. Status of the BR2 refurbishment programme

    International Nuclear Information System (INIS)

    Koonen, E.

    1995-01-01

    The operation of the BR2 reactor with its second beryllium matrix is foreseen up to mid-1995. A refurbishment programme has been established in order to allow for future operation during at least ten years. Recently a positive decision to effectively carry out this programme has been taken. The refurbishment action plan follows from a general assessment of the different systems of BR2, with respect to their actual status, the operational experience and the evolution of safety standards and criteria. Ageing considerations were of uppermost importance in those assessments, not only to assure safety of future operation, but also to guarantee future availability and reliability. (orig.)

  8. The probability safety assessment impact on the BR2 refurbishment

    International Nuclear Information System (INIS)

    Pouleur, Yvan

    1995-01-01

    The probabilistic safety assessment (PSA) study has proven its worth by establishing a sensitive safety screening of the reactor. It has focused engineering forces to technically improve safety systems and to measure the influence of functional modifications. In the future, the project will be developed in a living way, to reinforce the present structure along with continuous safety monitoring of the reactor and to develop engineers and operators safety skills. This paper presents the PSA impact on the BR2 (Belgian Reactor Two) refurbishment. (author)

  9. Ion beam analysis of gas turbine blades: evaluation of refurbishment ...

    Indian Academy of Sciences (India)

    Scanning proton microscopy was employed to evaluate the quality of refurbishment process of gas turbine ... environment of hot combustion gases occur due to various processes, such as .... performance of refurbished blades.7. Due to the ...

  10. Bruce A refurbishment - an update

    International Nuclear Information System (INIS)

    Liddle, R.

    2007-01-01

    Running slightly ahead of schedule on the critical path work, the Bruce A Restart Project has not been without its challenges. About a dozen major contractors with a workforce of 1,700 tradespeople share space inside the Units 1 and 2 Construction Island. They share support services, provided by project management contractor AMEC NCL, and they share the consequences when one part of the project advances ahead of schedule or another falls behind. They also share Bruce Power's safety values and are well on their way to surpassing five-million hours without an acute lost time injury. (author)

  11. Refurbishing the BR2 materials testing reactor

    International Nuclear Information System (INIS)

    Baugnet, J.M.; Dekeyser, J.; Gubel, P.

    1995-01-01

    SCK/CEN is refurbishing its BR2 reactor to allow its further operation during the next 15 years; in doing so, it chooses to keep BR2 available for future scientific and technological irradiation programs within an international context. (author) 2 figs

  12. Evaluation methodology for generator refurbishment decisions

    International Nuclear Information System (INIS)

    Moore, W.G.; Ulm, S.F.

    1991-01-01

    The Electrical Power Industry is undergoing tremendous change due to deregulation, aging equipment, environmental concerns, and investment/risk considerations. Public utility commissions, along with shareholders and end consumers, are closely monitoring utilities; decisions, especially in the area of costs-both Operation and Maintenance, and Capital. Increasing emphasis, within the conventional utility environment, has been and continue to be, placed on controlling expenditures. To be responsive to these industry and competitive pressures, utilities must make equipment refurbishment decisions. These decisions should be based on input from many sources, including the severity of the failure, cost of replacement versus refurbishment, risks and safety considerations, the expected remaining life of the unit, operational mode (base or peak), fuel type, initial costs, system capacity, available budgets, and financing options. Many times, however, refurbishment decisions are base don an abstract understanding of the above, but feel, or emotional attachment to a particular option. This paper describes a general methodology for refurbishment decision making, applied specifically to generators. Also included in a case history of one utility's progression through this process

  13. E-waste Management and Refurbishment Prediction (EMARP) Model for Refurbishment Industries.

    Science.gov (United States)

    Resmi, N G; Fasila, K A

    2017-10-01

    This paper proposes a novel algorithm for establishing a standard methodology to manage and refurbish e-waste called E-waste Management And Refurbishment Prediction (EMARP), which can be adapted by refurbishing industries in order to improve their performance. Waste management, particularly, e-waste management is a serious issue nowadays. Computerization has been into waste management in different ways. Much of the computerization has happened in planning the waste collection, recycling and disposal process and also managing documents and reports related to waste management. This paper proposes a computerized model to make predictions for e-waste refurbishment. All possibilities for reusing the common components among the collected e-waste samples are predicted, thus minimizing the wastage. Simulation of the model has been done to analyse the accuracy in the predictions made by the system. The model can be scaled to accommodate the real-world scenario. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. Extended layup of steam generators during a refurbishment outage

    International Nuclear Information System (INIS)

    Marks, C.R.; Little, M.D.; Slade, J.; Gendron, T.

    2009-01-01

    PLGS return to power during Autumn 2010. Current chemistry trends predict that minimal corrosion will have occurred during the refurbishment outage. A final assessment to be performed after startup is expected to confirm the current projections that: 1) The refurbishment outage time has not reduced the expected operating life of the steam generator tubing (i.e., the outage time should not be included in the inspection interval), and 2) Future operations (including at least one future chemical cleaning) will not challenge the corrosion allowances of carbon steel internals. (author)

  15. Water electrolysis system refurbishment and testing

    Science.gov (United States)

    Greenough, B. M.

    1972-01-01

    The electrolytic oxygen generator for the back-up water electrolysis system in a 90-day manned test was refurbished, improved and subjected to a 182-day bench test. The performance of the system during the test demonstrated the soundness of the basic electrolysis concept, the high development status of the automatic controls which allowed completely hands-off operation, and the capability for orbital operation. Some design improvements are indicated.

  16. Sustainable refurbishment of exterior walls and building facades. Final report, Part A - Methods and recommendations

    Energy Technology Data Exchange (ETDEWEB)

    Hakkinen, T. (ed.)

    2012-11-01

    This report is the final report of Sustainable refurbishment of building facades and exterior walls (SUSREF). SUSREF project was a collaborative (small/medium size) research project within the 7th Framework Programme of the Commission and it was financed under the theme Environment (including climate change) (Grant agreement no. 226858). The project started in October 1st 2009 and ended in April 30th 2012. The project included 11 partners from five countries. SUSREF developed sustainable concepts and technologies for the refurbishment of building facades and external walls. This report together with SUSREF Final report Part B and SUSREF Final Report Part C introduce the main results of the project. Part A focuses on methodological issues. The descriptions of the concepts and the assessment results of the developed concepts are presented in SUSREF Final report part B (generic concepts) and SUSREF Final report Part C (SME concepts). (orig.)

  17. Evaluation of three refurbished Guralp CMG-3TB seismometers.

    Energy Technology Data Exchange (ETDEWEB)

    Hart, Darren M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Merchant, Bion J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-05-01

    The overall objective of testing the Guralp CMG-3TB refurbished seismometers is to determine whether or not the refurbished sensors exhibit better data quality and require less maintenance when deployed than the original Guralp CMG-3TBs. SNL will test these 3 refurbished Guralps to verify performance specifications. The specifications that will be evaluated are sensitivity, bandwidth, self-noise, output impedance, clip-level, dynamic range over application passband, verify mathematical response and calibration response parameters for amplitude and phase.

  18. Refurbishment of BR2 (Phases 4 and 5)

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Van Der Auwera, J.

    1998-01-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed

  19. Refurbishment of BR2 (Phases 4 and 5)

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P; Dekeyser, J; Van Der Auwera, J

    1998-07-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed.

  20. Basic policy of JMTR refurbishment and regulatory procedure

    International Nuclear Information System (INIS)

    Tobita, Kenji

    2012-04-01

    The JMTR refurbishment started from FY2007 had been completed on the end of the FY2010. The refurbishment works carried out on about 60 items nuclear reactor systems, (about 40 of facilities and about 20 constructions) with no trouble. This report review the basic policy of JMTR refurbishment, such as a selection of facilities/equipments for the refurbishment and the determination method of specifications for repairs. The deliberation and discussion by the safety review committee of Oarai Research and Development Center in the Japan Atomic Energy Agency and nuclear regulatory procedure are included in this report. (author)

  1. Refurbishing Fæstningens Materialgård

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn

    2014-01-01

    upgrading and refurbishment of the individual buildings that make up the listed complex. The process focuses on the cooperation and dialogue between the parties involved. Fæstningens Materialgård is a case study where the Heritage Agency, the Danish Working Environment Authority and the owner as a team...... cooperated in identifying feasible refurbishment measures. Through the process the owner was supported by architects and engineers. Focus is put on how, to identify potential energy savings and, to decide on energy upgrading measures when refurbishing and restoring listed buildings. The refurbished...

  2. Refurbishment programme for the BR2-reactor

    Energy Technology Data Exchange (ETDEWEB)

    Koonen, E [Centre d' Etude de l' Energie Nucleaire, Studiecentrum voor Kernenergie, BR2 Department, Boeretang, Mol (Belgium)

    1992-07-01

    BR2 is a high flux engineering test reactor, which differs from comparable material testing reactors by its specific core array (fig. 1). It is a heterogeneous, thermal, tank-in-pool type reactor, moderated by beryllium and light water, which serves also as coolant. The fuel elements consist of cylindrical assemblies loaded in channels materialized by hexagonal beryllium prisms. The central 200 mm channel is vertical, while all others are inclined and form a hyperbolical arrangement around the central one. This feature combines a very compact core with the requirement of sufficient space for individual access to all channels through penetrations in the top cover of the aluminium pressure vessel. Each channel may hold a fuel element, a control rod, an experiment, an irradiation device or a beryllium plug. The refurbishment Program According to the present programme of C.E.N./S.C.K., BR2 will be in operation until 1996. At that time, the beryllium matrix will reach its foreseen end-of-life. In order to continue operation beyond this point, a thorough refurbishment of the reactor is foreseen, in addition to the unavoidable replacement of the matrix, to ensure quality of the installation and compliance with modern standards. Some fundamental options have been taken as a starting point: BR2 will continue to be used as a classical MTR, i.e. fuel and material irradiations and safety experiments with some additional service-activities. The present configuration is optimized for that use and there is no specific experimental requirement to change the basic concepts and performance characteristics. From the customers viewpoint, it is desirable to go ahead with the well-known features of BR2, to maintain a high degree of availability and reliability and to minimize the duration of the long shutdown. It is also important to limit the amount of nuclear liabilities. So the objective of the refurbishment programme is the life extension of BR2 for about 15 years, corresponding to

  3. Refurbishment programme for the BR2-reactor

    International Nuclear Information System (INIS)

    Koonen, E.

    1992-01-01

    BR2 is a high flux engineering test reactor, which differs from comparable material testing reactors by its specific core array (fig. 1). It is a heterogeneous, thermal, tank-in-pool type reactor, moderated by beryllium and light water, which serves also as coolant. The fuel elements consist of cylindrical assemblies loaded in channels materialized by hexagonal beryllium prisms. The central 200 mm channel is vertical, while all others are inclined and form a hyperbolical arrangement around the central one. This feature combines a very compact core with the requirement of sufficient space for individual access to all channels through penetrations in the top cover of the aluminium pressure vessel. Each channel may hold a fuel element, a control rod, an experiment, an irradiation device or a beryllium plug. The refurbishment Program According to the present programme of C.E.N./S.C.K., BR2 will be in operation until 1996. At that time, the beryllium matrix will reach its foreseen end-of-life. In order to continue operation beyond this point, a thorough refurbishment of the reactor is foreseen, in addition to the unavoidable replacement of the matrix, to ensure quality of the installation and compliance with modern standards. Some fundamental options have been taken as a starting point: BR2 will continue to be used as a classical MTR, i.e. fuel and material irradiations and safety experiments with some additional service-activities. The present configuration is optimized for that use and there is no specific experimental requirement to change the basic concepts and performance characteristics. From the customers viewpoint, it is desirable to go ahead with the well-known features of BR2, to maintain a high degree of availability and reliability and to minimize the duration of the long shutdown. It is also important to limit the amount of nuclear liabilities. So the objective of the refurbishment programme is the life extension of BR2 for about 15 years, corresponding to

  4. Advanced instrumentation and control systems for CANDU refurbishment

    International Nuclear Information System (INIS)

    Sklyar, V.; Bakhmach, I.; Kharchenko, V.; Andrashov, A.; Baranova, O.

    2011-01-01

    The purpose of the work is to discuss opportunities to modernize I and C systems of CANDU reactors on the base of Radiy's digital safety platform. This paper discusses the following topics: a business model for CANDU, I and C systems refurbishment, FPGA technology issues, comparison of different approaches to refurbish obsolete I and C systems. (author)

  5. Integration of remote refurbishment performed on ITER components

    Energy Technology Data Exchange (ETDEWEB)

    Dammann, A., E-mail: alexis.dammann@iter.org [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Antola, L. [AMEC, 31 Parc du Golf, CS 90519, 13596 Aix en Provence (France); Beaudoin, V. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Dremel, C. [Westinghouse, Electrique France/Astare, 122 Avenue de Hambourg, 13008 Marseille (France); Evrard, D. [SOGETI High Tech, 180 Rue René Descartes, 13851 Aix en Provence (France); Friconneau, J.P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); Lemée, A. [SOGETI High Tech, 180 Rue René Descartes, 13851 Aix en Provence (France); Levesy, B.; Pitcher, C.S. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France)

    2015-10-15

    Highlights: • System engineering approach to consolidate requirements to modify the layout of the Hot Cell. • Illustration of the loop between requirement and design. • Verification process. - Abstract: Internal components of the ITER Tokamak are replaced and transferred to the Hot Cell by remote handling equipment. These components include port plugs, cryopumps, divertor cassettes, blanket modules, etc. They are brought to the refurbishment area of the ITER Hot Cell Building for cleaning and maintenance, using remote handling techniques. The ITER refurbishment area will be unique in the world, when considering combination of size, quantity of complex component to refurbish in presence of radiation, activated dust and tritium. The refurbishment process to integrate covers a number of workstations to perform specific remote operations fully covered by a mast on crane system. This paper describes the integration of the Refurbishment Area, explaining the functions, the methodology followed, some illustrations of trade-off and safety improvements.

  6. BIM-Based Timber Structures Refurbishment of the Immovable Heritage Listed Buildings

    Science.gov (United States)

    Henek, Vladan; Venkrbec, Václav

    2017-12-01

    The use of Building information model (BIM) design tools is no longer an exception, but a common issue. When designing new buildings or complex renovations using BIM, the benefits have already been repeatedly published. The essence of BIM is to create a multidimensional geometric model of a planned building electronically on a computer, supplemented with the necessary information in advance of the construction process. Refurbishment is a specific process that combines both - new structures and demolished structures, or structures that need to be dismantled, repaired, and then returned to the original position. Often it can be historically valuable part of the building. BIM-based repairs and refurbishments of the constructions, especially complicated repairs of the structures of roof trusses of immovable heritage listed buildings, have not yet been credibly presented. However, the use of BIM tools may be advantageous in this area, because user can quickly response to the necessary changes that may be needed during refurbishments, but also in connection with the quick assessment and cost estimation of any unexpected additional works. The paper deals with the use of BIM in the field of repairs and refurbishment of the buildings in general. The emphasis on monumentally protected elements was priority. Advantage of the proposal research is demonstrated on case study of the refurbishment of the immovable heritage listed truss roof. According to this study, this construction was realized in the Czech Republic. Case study consists of 3D modelled truss parts and the connected technological workflow base. The project work was carried out in one common model environment.

  7. Development of a virtual training simulator for a challenging refurbishment task

    International Nuclear Information System (INIS)

    Mort, P.E.

    1996-01-01

    An overview is presented of the technology, developed by British Nuclear Fuels Limited (BNFL), to create a virtual training simulator for refurbishment tasks. It focuses on the Raffinate Project, a challenging plant modification take, performed remotely, during which component removal, welding and installation of new components are all undertaken. The Training Simulator developed required fast multiprocessor computing with system intercommunication. Operators responded well to the Training Simulator and further improvements to the system are underway. (UK)

  8. Mechanical Properties Experimental Study of Engineering Vehicle Refurbished Tire

    Science.gov (United States)

    Qiang, Wang; Xiaojie, Qi; Zhao, Yang; Yunlong, Wang; Guotian, Wang; Degang, Lv

    2018-05-01

    The vehicle refurbished tire test system was constructed, got load-deformation, load-stiffness, and load-compression ratio property laws of engineering vehicle refurbished tire under the working condition of static state and ground contact, and built radial direction loading deformation mathematics model of 26.5R25 engineering vehicle refurbished tire. The test results show that radial-direction and side-direction deformation value is a little less than that of the new tire. The radial-direction stiffness and compression ratio of engineering vehicle refurbished tire were greatly influenced by radial-direction load and air inflation pressure. When load was certain, radial-direction stiffness would increase with air inflation pressure increasing. When air inflation pressure was certain, compression ratio of engineering vehicle refurbished tire would enlarge with radial-direction load increasing, which was a little less than that of the new and the same type tire. Aging degree of old car-case would exert a great influence on deformation property of engineering vehicle refurbished tire, thus engineering vehicle refurbished tires are suitable to the working condition of low tire pressure and less load.

  9. Multivariant design and multiple criteria analysis of building refurbishments

    Energy Technology Data Exchange (ETDEWEB)

    Kaklauskas, A.; Zavadskas, E. K.; Raslanas, S. [Faculty of Civil Engineering, Vilnius Gediminas Technical University, Vilnius (Lithuania)

    2005-07-01

    In order to design and realize an efficient building refurbishment, it is necessary to carry out an exhaustive investigation of all solutions that form it. The efficiency level of the considered building's refurbishment depends on a great many of factors, including: cost of refurbishment, annual fuel economy after refurbishment, tentative pay-back time, harmfulness to health of the materials used, aesthetics, maintenance properties, functionality, comfort, sound insulation and longevity, etc. Solutions of an alternative character allow for a more rational and realistic assessment of economic, ecological, legislative, climatic, social and political conditions, traditions and for better the satisfaction of customer requirements. They also enable one to cut down on refurbishment costs. In carrying out the multivariant design and multiple criteria analysis of a building refurbishment much data was processed and evaluated. Feasible alternatives could be as many as 100,000. How to perform a multivariant design and multiple criteria analysis of alternate alternatives based on the enormous amount of information became the problem. Method of multivariant design and multiple criteria of a building refurbishment's analysis were developed by the authors to solve the above problems. In order to demonstrate the developed method, a practical example is presented in this paper. (author)

  10. Refurbishment of BR2 (Phases 4 and 5)

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P.; Dekeyser, J.; Van Der Auwera, J

    1998-07-01

    The BR2 is a materials testing reactor and is SCK-CEN's most important nuclear facility. After an extensive refurbishment to compensate for the ageing of the installation, the reactor was restarted in April 1997. In phase 4 of the refurbishment programme, various activities were performed to allow reactor start-up. In phase 5, remaining refurbishment works were carried out as well as the extra studies and upgradings required by the licensing authorities. Major achievements in 1997 are described and discussed.

  11. Understanding valve program complexity in a refurbishment environment - learning from the past

    International Nuclear Information System (INIS)

    Roth, H.E.

    2012-01-01

    The complexity of Valve Program development, planning, execution and management in a refurbishment environment is an enormous undertaking requiring the proper coordination and integration of many moving parts. As such, lack of attention and understanding of this complexity has led to significant cost and schedule overruns in past refurbishment projects in the province. OPEX indicates the challenges in completing valve scope during refurbishments are related but not limited to; lack of detailed condition assessments, improper scope development, insignificant strategic approach to work task planning, scheduling and procurement, absence of contingency planning for common ‘as found’ conditions during execution, lack of proper training requirements, etc. In addition, past contracting strategies to employ numerous companies in collaboration to complete such a complex and specialized program, has resulted in further complications surrounding the management and integration of multiple quality programs and internal company processes. Finally, the aftermath of such fragmented projects results in an absolute closeout nightmare, often times taking years to locate, sift through and re-integrate pertinent information back into customer systems. Valve Program complexity cannot be understood by just anyone, only those that have lived through a refurbishment project and experienced the challenges mentioned above have the knowledge, skill, and ability to appreciate how to tactically apply past learning to realize future improvements. Furthermore, effective contractor-customer collaboration is crucial; true and in-depth knowledge and understanding of the customer quality programs, engineering and work management processes, configuration management requirements, and most importantly the imperative significance of nuclear safety, are all essential components to ensure overall alignment and program success. (author)

  12. Understanding valve program complexity in a refurbishment environment - learning from the past

    Energy Technology Data Exchange (ETDEWEB)

    Roth, H.E. [Babcock & Wilcox Canada Ltd., Cambridge, Ontario (Canada)

    2012-07-01

    The complexity of Valve Program development, planning, execution and management in a refurbishment environment is an enormous undertaking requiring the proper coordination and integration of many moving parts. As such, lack of attention and understanding of this complexity has led to significant cost and schedule overruns in past refurbishment projects in the province. OPEX indicates the challenges in completing valve scope during refurbishments are related but not limited to; lack of detailed condition assessments, improper scope development, insignificant strategic approach to work task planning, scheduling and procurement, absence of contingency planning for common ‘as found’ conditions during execution, lack of proper training requirements, etc. In addition, past contracting strategies to employ numerous companies in collaboration to complete such a complex and specialized program, has resulted in further complications surrounding the management and integration of multiple quality programs and internal company processes. Finally, the aftermath of such fragmented projects results in an absolute closeout nightmare, often times taking years to locate, sift through and re-integrate pertinent information back into customer systems. Valve Program complexity cannot be understood by just anyone, only those that have lived through a refurbishment project and experienced the challenges mentioned above have the knowledge, skill, and ability to appreciate how to tactically apply past learning to realize future improvements. Furthermore, effective contractor-customer collaboration is crucial; true and in-depth knowledge and understanding of the customer quality programs, engineering and work management processes, configuration management requirements, and most importantly the imperative significance of nuclear safety, are all essential components to ensure overall alignment and program success. (author)

  13. Refurbishment of Cirus in-core components

    International Nuclear Information System (INIS)

    Bhatnagar, A.; Sahu, A.K.; Rathore, K.K.; Subudhi, D.; Kharpate, A.V.; Tikku, A.C.

    2006-01-01

    Circus is a 40- MWt vertical tank type research reactor with natural uranium as fuel, demineralised light water as coolant, heavy water as moderator and graphite as reflector. The reactor was commissioned in the year 1960 and operated at an overage availability factor of over 70% till early nineties, when various systems, structures and components (SSCs) started showing signs of ageing. Detailed ageing studies were therefore carried out to assess the condition of various SSCs and refurbishing requirements were finalized towards extending the life of the reactor. In-core components, being non-replaceable generally, were critically examined to the extent possible. Detailed visual examination of a few reactor vessel (RV) tubes, made of aluminium, was carried out using micro video camera and in addition all the RV tubes were inspected using eddy current testing method. RV shell, also made of aluminium, was similarly visually inspected with micro video camera. To assess the effect of irradiation on the RV material, samples of similar tubes irradiated to comparable neutron fluence were tested. Towards assessment of fatigue life of RV expansion joint, made of aluminium, a finite element analysis using NISA computer code was performed. Theoretical assessment for stored Wigner energy in graphite reflector was carried out. Graphite block samples were also removed from the reactor and stored energy levels were measured to plan for any in-situ graphite annealing, if required. Visual inspection of approachable portions of steel and aluminium thermal shields was also carried out. These water-cooled thermal shields provided above and below the RV were hydro tested. The weld joint between coolant inlet pipe and top plate of upper aluminium shield showed minor leakage. A special metallic hollow plug was developed and remotely installed in the leaky pipe to isolate the leaky portion while maintaining the coolant flow in the pipe. Helium leak was found from flange joints located on

  14. Analytical cell decontamination and shielding window refurbishment. Final report, March 1984-March 1985

    International Nuclear Information System (INIS)

    Smokowski, R.T.

    1985-01-01

    This is a report on the decontamination and refurbishment of five inactive contaminated analytical cells and six zinc bromide filled shielding windows. The analytical cells became contaminated during the nuclear fuel reprocessing carried out by Nuclear Fuel Services from 1966 to 1972. The decontamination and decommissioning (D and D) work was performed in these cells to make them useful as laboratories in support of the West Valley Demonstration Project. To accomplish this objective, unnecessary equipment was removed from these cells. Necessary equipment and the interior of each cell were decontaminated and repaired. The shielding windows, essentially tanks holding zinc bromide, were drained and disassembled. The deteriorated, opaque zinc bromide was refined to optical clarity and returned to the tanks. All wastes generated in this operation were characterized and disposed of properly. All the decontamination and refurbishment was accomplished within 13 months. The Analytical Hot Cell has been turned over to Analytical Chemistry for the performance high-level waste (HLW) characterization analysis

  15. Ion beam analysis of gas turbine blades: evaluation of refurbishment ...

    Indian Academy of Sciences (India)

    Abstract. Refurbishment of hot components of gas turbines damaged in the harsh working environments is neces- ... 3000 r.p.m. and fluid forces that can cause fracture, yield- ... 800, 1200 and 2000 grit by employing mechanical grinding.

  16. Refurbishment of Railroad Crossties : A Technical and Economic Analysis

    Science.gov (United States)

    1977-12-01

    An analysis of the principal modes of failure for wooden railroad crossties was conducted and an evaluation of the technical and economic feasibility of refurbishing these ties was conducted. Among the principal modes of structural deterioration, onl...

  17. OSIRIS. Refurbishment and management of ageing effects

    International Nuclear Information System (INIS)

    Joly, C.; Guidez, J.; Contenson, G. de; Marin, J.P.

    1995-01-01

    OSIRIS, one of the French CEA research reactors (Saclay, France), achieved criticality for the first time on July 1966. During the 29 running years OSIRIS was mainly devoted to production and technological irradiations. To satisfy these objectives, OSIRIS is equipped by different test facilities allowing: the long time irradiation of different material including fuel rods, reactor vessel materials, fusion reactor components; the power ramps of fuel rods; the activation analysis; the neutron-radiography of materials and test sections... All the foreseen irradiation programmes will only be possible if safety and high performances of the reactor are guaranteed. That is why a continuous maintenance and improvement programme has taken place during the whole life of the reactor. This paper gives an overview of this programme, mainly about the part conducted during the last years. Details about characteristics of the reactor, history of experiments, maintenance programme, instrumentation and control system, electrotechnical low voltage supply network, decay tanks and water purification system are summarized. The paper focuses on the refurbishment or the replacement of the main components connected to the continuous maintenance programme to guarantee the reliability, the safety and the high performances of the reactor. (J.S.). 2 refs., 8 figs., 2 tabs

  18. Experience feedback on the refurbishment of the LECA hot laboratory at Cadarache

    International Nuclear Information System (INIS)

    Grandjean, Jean-Paul; Autran, Bernard; Blanc, Jean-Yves

    2007-01-01

    Full text: After ten years of renovation work, the LECA hot laboratory refurbishment project has finally been completed which means it is now time to draw a few conclusions. Refurbishment of LECA was needed to enable PIE in this laboratory up to 2015. Improvements were made according to the laboratory safety assessment in March 2001. More than 400,000 working hours were clocked up without any serious accidents. The overall radiological record remained below 0.4 man.Sv for this period despite a high contamination level in the venting system and hot cells. The total fissile mass was decreased by a factor of three, and contamination was also considerably reduced. The project was finalised two years later than expected, mainly due to difficulties with two contracts on civil engineering work to improve seismic resistance and on inserting stainless steel casing into some hot cells. Renovation work on existing structures was underestimated, as was the time required to re-commission the cells. The fact that the total number of external staff working inside the facility at the same time was limited also slowed work down. This delay affected the research programmes mainly over the last two years. On the whole, 85 % of all experimentation activities were nevertheless continued during refurbishment. New steps for refurbishment have already been planned so as to extend the LECA service life once again. A line of lead-shielded cells - not designed to withstand current earthquake standards - will be demolished before the end of 2008, and civil engineering operations have been programmed for 2013-2014 so the facility will be able to withstand a maximum design earthquake. (authors)

  19. Refurbishment of BR2 (Phase 4 and 5)

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Van der Auwera, J.

    1998-01-01

    The extensive refurbishment of the BR-2 materials testing reactor should allow another 10 to 15 years of continued operation. The refurbishment programme is required in order to comply with modern safety standards, to enhance the reliability of operation, and to compensate for the ageing of the installations of a facility that has reached about 35 years of intensive service. The main objectives and achievements of phase 4 and 5 are described

  20. Simulated thermal energy demand and actual energy consumption in refurbished and non-refurbished buildings

    Science.gov (United States)

    Ilie, C. A.; Visa, I.; Duta, A.

    2016-08-01

    The EU legal frame imposes the Nearly Zero Energy Buildings (nZEB) status to any new public building starting with January 1st, 2019 and for any other new building starting with 2021. Basically, nZEB represents a Low Energy Building (LEB) that covers more than half of the energy demand by using renewable energy systems installed on or close to it. Thus, two steps have to be followed in developing nZEB: (1) reaching the LEB status through state- of-the art architectural and construction solutions (for the new buildings) or through refurbishing for the already existent buildings, followed by (2) implementing renewables; in Romania, over 65% of the energy demand in a building is directly linked to heating, domestic hot water (DHW), and - in certain areas - for cooling. Thus, effort should be directed to reduce the thermal energy demand to be further covered by using clean and affordable systems: solar- thermal systems, heat pumps, biomass, etc. or their hybrid combinations. Obviously this demand is influenced by the onsite climatic profile and by the building performance. An almost worst case scenario is approached in the paper, considering a community implemented in a mountain area, with cold and long winters and mild summers (Odorheiul Secuiesc city, Harghita county, Romania). Three representative types of buildings are analysed: multi-family households (in blocks of flats), single-family houses and administrative buildings. For the first two types, old and refurbished buildings were comparatively discussed.

  1. Technological energy and environmental refurbishment of historical Italian libraries

    Directory of Open Access Journals (Sweden)

    Alessandra Battisti

    2014-10-01

    Full Text Available Active libraries in Italy are around 13.000 and, taken as a whole, the property and management relate mainly to public institutions such as the state, regions, local authorities, cultural institutions, universities, and partly to religious institutions and individuals. In this paper is presented the work of studies and research, commissioned to the authors by the General Direction for Libraries of the Ministry of Heritage and Culture (Mibac, which ended recently, addressing the architectural, energy and environmental refurbishment of national historic libraries distributed on the Italian territory, with special focus on 4 among 46 owned by the Ministry of Culture (the Nazionale Centrale di Roma, the Nazionale Centrale in Florence, the national University of Turin and the Angelica in Rome believed by the authors and client as examples of recurring issues and ideals to lend itself to the construction of a model of intervention replicable on other historical Italian libraries.The main objective of the project is the identification of physical and perceptual factors of wear2, which threaten the conservation of the historical and artistic heritage of the historic center of Venice, with a particular focus on the effects of anthropogenic pressure linked to tourism, and the evaluation of their level of danger. A further objective is the recognition of measurable parameters (indicators for monitoring and, subsequently, mitigation strategies for the most significant phenomena.

  2. How about a slightly more? The PLUS energy school Rostock. A refurbishment project serving as a model; Darf's ein bisschen mehr sein? Die PLUS Energieschule Rostock. Ein Sanierungsobjekt, das Schule machen koennte

    Energy Technology Data Exchange (ETDEWEB)

    Wollensak, Heidi [Wollensak Architekten, Wismar (Germany); Institut fuer Gebaeude + Energie + Licht Planung, Wismar (Germany)

    2012-11-01

    Since the implementation of the Energy Saving Ordinance (EnEV) the construction industry makes every effort of energy-optimized construction and renovation. In order to implement the recent energy policy objectives of the Federal Government also the Federal Ministry of Economics and Technology (Berlin, Federal Republic of Germany) set a signal: Within the research project 'Energy-efficient schools' under the program 'Energy-optimized building' three selected schools should produce more primary energy than it needs for its own operation. The European School of Rostock (Federal Republic of Germany) is the largest of these PLUS energy schools - the first phase of construction will soon be occupied.

  3. Small might be beautiful, but bigger performs better: Scale economies in “green” refurbishments of apartment housing

    International Nuclear Information System (INIS)

    Michelsen, Claus; Rosenschon, Sebastian; Schulz, Christian

    2015-01-01

    The energy efficiency of the residential housing stock plays a key role in strategies to mitigate climate change and global warming. In this context, it is frequently argued that private investment and the quality of thermal upgrades are too low in the light of the challenges faced and the potential energy cost savings. While many authors address the potential barriers for investors to increase energy efficiency, studies on the capabilities of different investors to reduce energy requirements of their property are scarce. This study investigates potential advantages of housing company's size, i.e. economies of scale, economies of scope and institutional learning in thermal upgrades of residential housing. Based on unique data on energy consumption in 102,307 apartment buildings in Germany, we present new evidence for the advantages and disadvantages of a housing company's size in “green” retrofitting projects. Our estimations show, that large housing companies outperform private landlords by far in high effort refurbishment projects. In contrast, private landlords appear to have advantages in low effort, incremental refurbishment activities. We demonstrate that a substantial share of the advantages of larger firms can be associated with specialization (i.e. repeated projects). The results offer new options for policy makers to refine the support schemes toward a low carbon housing stock. - Highlights: • First study to analyze the effects of housing companies size on “green” refurbishment • Economies of scale, scope and learning all affect energy efficiency refurbishments. • Specialization on distinct refurbishments influences outcome of thermal upgrades. • Analysis based on a large and unique sample of apartment buildings in Germany

  4. dena refurbishment investigation. Pt. 1. Efficiency of energetic modernization in the inventory of rented apartments. Accompanying research according to the dena project: ''Existing low-energy house''; dena-Sanierungsstudie. T. 1. Wirtschaftlichkeit energetischer Modernisierung im Mietwohnungsbestand. Begleitforschung zum dena-Projekt ''Niedrigenergiehaus im Bestand''. Bericht 2010

    Energy Technology Data Exchange (ETDEWEB)

    Discher, Henning [Deutsche Energie-Agentur GmbH, Berlin (Germany); Hinz, Eberhard; Enseling, Andreas [Institut Wohnen und Umwelt GmbH (IWU), Darmstadt (Germany)

    2010-12-08

    Due to the world-wide increasing energy demand, the strongly varying energy prices and not at least due to the effects of the climate change, politics, economics and science face great challenges. Energy efficiency in the building sector plays an important role in the reduction of energy consumption. An energetic modernization of the existing buildings is crucial toward achieving the goals of climate protection. Nevertheless there still exist caveas toward energy-efficient building and refurbishment. For the future, market constraints must purposefully be reduced and the chances of energy-efficient refurbishments have to be used.

  5. Loading Deformation Characteristic Simulation Study of Engineering Vehicle Refurbished Tire

    Science.gov (United States)

    Qiang, Wang; Xiaojie, Qi; Zhao, Yang; Yunlong, Wang; Guotian, Wang; Degang, Lv

    2018-05-01

    The paper constructed engineering vehicle refurbished tire computer geometry model, mechanics model, contact model, finite element analysis model, did simulation study on load-deformation property of engineering vehicle refurbished tire by comparing with that of the new and the same type tire, got load-deformation of engineering vehicle refurbished tire under the working condition of static state and ground contact. The analysis result shows that change rules of radial-direction deformation and side-direction deformation of engineering vehicle refurbished tire are close to that of the new tire, radial-direction and side-direction deformation value is a little less than that of the new tire. When air inflation pressure was certain, radial-direction deformation linear rule of engineer vehicle refurbished tire would increase with load adding, however, side-direction deformation showed linear change rule, when air inflation pressure was low; and it would show increase of non-linear change rule, when air inflation pressure was very high.

  6. Engineering study radioactive liquid waste treatment plant refurbishment

    International Nuclear Information System (INIS)

    Suazo, I.L.

    1994-01-01

    This feasibility study will investigate the opportunities, restrictions and cost impact to refurbish the existing Radioactive Liquid Waste Treatment Plant (RLWTP) while utilizing the same basic criteria that was used in the development of the new Radioactive Liquid Waste Treatment Facility (RLWTF). The objective of this study is to perform a more in-depth analysis of refurbishing the existing than has been done in the past so as to provide a basis for comparison between refurbishing the existing or constructing a new. The existing plant is located at Technical Area 50 (TA-50) within the Los Alamos National Laboratory (LANL). The initial structure was built in 1963. Over the ensuing years, the building has been modified and several additions have been constructed. In 1966, laboratories, ion exchange and pretreatment functions were added. The decontamination and decommissioning activities and ventilation equipment were added in 1984. The following assumptions are the basic parameters considered in the development of a design concept to refurbish the RLWTP: (1) Allow continued operation of the during retrofit construction. (2) Design the necessary expansion within the site constraints. (3) Satisfy National Pollutant Discharge Elimination System (NPDES) and National Emission Standards for Hazardous Air Pollutants (NESHAPS) permit conditions and other environmental regulations. (4) Comply with present DOE Orders and building code requirements. The refurbishment concept is a phased demolition and construction process

  7. Refurbishment and safety upgradation of research reactor Cirus

    International Nuclear Information System (INIS)

    Marik, S.K.; Rao, D.V.H.; Bhatnagar, A.; Pant, R.C.; Tikku, A.C.; Sankar, S.

    2006-01-01

    Cirus, a 40 MW t, vertical tank type research reactor, having wide range of research facilities, was commissioned in the year 1960. This research reactor, situated at Mumbai, India has been operated and utilized extensively for isotope production, material testing and neutron beam research for nearly four decades. With a view to assess the residual life of the reactor, detailed ageing studies were carried out during the early 1990s. Based on these studies, refurbishment of Cirus for its life extension was taken up. During refurbishment, additional safety features were incorporated in various systems to qualify them for the current safety standards. This paper gives the details of the operating experiences, utilization of the reactor along with methodologies followed for carrying out detailed ageing studies, refurbishment and safety upgradation for its life extension

  8. Impact of flow accelerated corrosion (FAC) on feeder refurbishment planning

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2010-01-01

    Feeder wall thinning due to flow accelerated corrosion (FAC) may result in a large number of feeder replacements in the future. In this study, the process of FAC is modelled using a probabilistic approach and used to predict the expected number of degraded feeders and their replacements in the future. Because of the high cost associated with feeder replacements, it may be optimal to replace the entire feeder population during a single refurbishment outage when the unit cost of replacement is likely to be less. The results of this study demonstrate, however, that the unit cost of feeder replacement must be sufficiently lower than the standard replacement cost and the refurbishment performed at an optimal time to realize the economic benefits associated with the refurbishment. (author)

  9. Development of an improved low profile hub seal refurbishment tool

    International Nuclear Information System (INIS)

    Wagg, L.

    1997-01-01

    The hub seal area of a fuel channel feeder coupling can be exposed to oxygen in the atmosphere if protective measures are not taken during maintenance outages. Exposure to oxygen can lead to pitting of the hub seal area. Although this is a rare occurrence, the resulting possibility of the feeder coupling leakage led to the development of a feeder hub refurbishment tool. To reduce time and man-rem exposure during feeder hub seal refurbishment, an improved low profile hub seat refurbishing tool has been developed. The improved tool design will allow for quick and controlled removal of material, and the restoration of a roll-burnished finish equivalent to the original requirements. The new tool can be used in maintenance operations, with the end fitting present, as well as under retube-type circumstances, with the end fitting removed. (author)

  10. The BR2 refurbishment: from concept to achievements

    International Nuclear Information System (INIS)

    Gubel, P.

    2002-01-01

    The BR2 reactor is one of the major research reactors in the world. It's operation started in the early 1960's. Two major refurbishments operation have been carried out since then. The report gives an overview of the methodology and inspections, which resulted in a refurbishment action plan. The main realizations and complementary actions required by the Licensing Authorities are summarized. Finally the operation experience feedback, four years now after start-up, is briefly discussed as well as the main aspects of the present safety reassessment [ru

  11. Rotor pole refurbishment for hydrogenerators: insulation problems and solutions

    International Nuclear Information System (INIS)

    Reynolds, R.R.; Rux, L.

    2005-01-01

    Rotor poles for Unit 1 at Lower Granite Powerhouse were removed from the rotor and shipped to a repair facility for refurbishment. Upon inspection, it was found that all of the pole bodies exhibited a distinct bow, center to end, on the pole mounting surface. In some cases, the deflection was as much as 0.106 inch. Concerns were raised about how this condition might affect the ability to properly insulate and/or re-seat the poles. This paper presents details of the rotor pole and field winding evaluation, the problems encountered, and the solutions implemented to successfully refurbish the rotor poles and field winding. (author)

  12. Refurbishment and safety up-gradation of Cirus Reactor

    International Nuclear Information System (INIS)

    Rao, D.V.H.

    2004-01-01

    Cirus, a 40 MWth, vertical tank type research reactor, having a wide range of research facilities, was commissioned in 1960. This research facility has been operated and utilized extensively for nearly four decades. With a view to assess the residual life of the reactor, detailed ageing studies were carried out. Based on this, refurbishment work for life extension was undertaken. During this work, additional safety features were incorporated to improve the overall safety of the reactor. This lecture details the methodologies used for ageing studies and refurbishment activities for life extension with enhanced safety. (author)

  13. Darlington refurbishment - performance improvement programs goals and experience

    Energy Technology Data Exchange (ETDEWEB)

    Mitchell, N. [Ontario Power Generation, Toronto, ON (Canada)

    2015-07-01

    This paper discusses the refurbishment program at the Darlington site. The program focuses on safety, integrity, excellence and personnel. Worker safety and public safety are of the highest priority. Success resulted from collaborative engineering interface, collaborative front end planning, highly competent people and respectful relationship with partners and regulators.

  14. Airline fuel saving through JT9D engine refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Allison, J.W.; Weisel, D.R.

    1981-01-01

    Areas are identified in the JT9D engine where the potential exists for either further performance recovery following repair, or for improved performance retention. A number of new procedures and tools which will improve performance recovery are described. Improvements in inspection techniques are discussed. Operational techniques which will improve performance retention and impact degree of refurbishment required are also presented.

  15. Scout house in Koeniz - Refurbishment of the heating system; Pfadiheim Weiermatt, Sanierung Waermeversorgung - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Messerli, A. [Neuenschwander - Neutair AG, Berne (Switzerland); Jenni, H. [Heimverein Falkenstein, Koeniz (Switzerland)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a project carried out in Koeniz, Switzerland. The report examines how the energy situation at the local scout house was improved. The work included the refurbishment of the heating system using solar collectors, intelligently controlled heat pumps, a photovoltaics installation and even solar-powered street lighting. The project, which received a substantial echo from the general public, is described. The scouts were directly involved in the project and, in part, in the construction work. This, according to the authors, enhanced the educational aspect of the project. The report presents details on the various installations and is illustrated with schematics and photos. Also, the results of monitoring and measurements made are presented.

  16. Exposure management in a hot-cell decontamination and refurbishment campaign

    International Nuclear Information System (INIS)

    Courtney, J.C.; Ferguson, K.R.; Chesnovar, D.L.; Huebner, M.F.

    1984-01-01

    We developed a minicomputer-based system to provide rapid access to personnel dosimetry data during a campaign to decontaminate and refurbish a hot-cell at the Hot Fuel Examination Facility (HFEF) Complex. This system allows project management to estimate doses for future tasks, assess the effectiveness of decontamination and personnel protection techniques, and balance exposures among members of various skill groups. As the campaign progresses, projected total exposures can be minimized by tradeoffs between estimated doses during decontamination and estimated dose savings during the refurbishment phase. The effectiveness of various dose-reduction procedures can be compared on the basis of data from a few cell entries before more extensive routine operations are scheduled. Because the radiation fields vary significantly with location in the cell, we find that measurements of whole-body, skin, and extremity doses are more valuable than dose-rate information. Penetrating and skin radiation doses to personnel can be compared to administrative guidelines. This helps us to select the most effective combination of protective clothing. For example, leaded gauntlets reduce the dose rate to the workers' hands, but their use can increase the time required for some in-cell tasks. Hence, use of gauntlets can lead to higher whole-body and skin doses. The program is written for the HFEF Complex Harris/6 minimainframe computer with a disk-monitor operating system

  17. Refurbishment and Automation of the Thermal/Vacuum Facilities at the Goddard Space Flight Center

    Science.gov (United States)

    Donohue, John T.; Johnson, Chris; Ogden, Rick; Sushon, Janet

    1998-01-01

    The thermal/vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the 11 facilities, currently 10 of the systems are scheduled for refurbishment and/or replacement as part of a 5-year implementation. Expected return on investment includes the reduction in test schedules, improvements in the safety of facility operations, reduction in the complexity of a test and the reduction in personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering and for the automation of thermal/vacuum facilities and thermal/vacuum tests. Automation of the thermal/vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs) and the use of Supervisory Control and Data Acquisition (SCADA) systems. These components allow the computer control and automation of mechanical components such as valves and pumps. In some cases, the chamber and chamber shroud require complete replacement while others require only mechanical component retrofit or replacement. The project of refurbishment and automation began in 1996 and has resulted in the computer control of one Facility (Facility #225) and the integration of electronically controlled devices and PLCs within several other facilities. Facility 225 has been successfully controlled by PLC and SCADA for over one year. Insignificant anomalies have occurred and were resolved with minimal impact to testing and operations. The amount of work remaining to be performed will occur over the next four to five years. Fiscal year 1998 includes the complete refurbishment of one facility, computer control of the thermal systems in two facilities, implementation of SCADA and PLC systems to support multiple facilities and the implementation of a Database server to allow efficient test management and data analysis.

  18. Refurbishment of the BNFL Magnox reprocessing plant

    International Nuclear Information System (INIS)

    Carr, V.M.; Edgar, R.

    1998-01-01

    The Magnox Reprocessing Plant was commissioned in 1964. Since then it has reprocessed more than 35,000 t of irradiated uranium metal fuel. The plant is subject to routine shutdowns to allow maintenance and project work to be undertaken. During the 1997 shutdown the opportunity was taken to replace several life limiting parts of the plant to ensure Magnox reprocessing capability well beyond the year 2010. This shutdown was the largest and most complex undertaken by Magnox Reprocessing, with a total committed value of 130 million UK pounds, 17.5 million UK pounds committed in the shutdown itself and the balance on installation, design and procurement preparing for the shutdown. The work was completed within safety targets, to programme and within budget. The lessons learned and experience gained have been fed into the methodologies and procedures for planning future project and shutdown work within BNFL. This report is part of the output from this process of continually improving performance. (author)

  19. Refurbishment and safety management of JMTR in extended showdown

    International Nuclear Information System (INIS)

    Ide, Hiroshi; Hori, Naohiko; Gorai, Shigeru; Kusunoki, Tsuyoshi

    2011-06-01

    Japan Materials Testing Reactor (JMTR) is a testing reactor dedicated to the irradiation tests of materials and fuels. The reactor type of the JMTR is light water moderated and cooled tank type. It achieved first criticality in 1968. Operation was started in 1970. The JMTR had been being operated for 38 years from first criticality to the JMTR No.165 cycle finished. Periodic Safety Review (PSR) was carried out with confirming the integrity inspection of the JMTR reactor facilities. And the 10 years maintenance plan was made in 2004. After that, the restart of the JMTR has been strongly requested from various users as the only irradiation testing reactor in Japan. Finally, Japan Atomic Energy Agency (JAEA) decided the refurbishment and restart of the JMTR in December 2006, and the refurbishment works was started from FY 2007. The equipment to remain in use and that which needs replacing before the restart of the JMTR was selected after having been evaluated on its damage and wear due to aging significance in safety functions, past safety-related maintenance date, and the enhancement of facility operation. The renewal work of power supply system, boiler, radioactive waste facility, etc. was already carried out as scheduled. The renewal work of reactor control system, nuclear instrumentation system and so on is being carried out. As for the safety management during reactor operation, the facility periodical own inspection and daily inspection is carried out for the purpose of maintaining soundness and reliability of facilities and equipments. And it is confirmed that the performance of facilities and equipments is maintained. As for the radiation control, irradiation dose limit determined by the law is obeyed. Based on the Concept of radiation protection of the International Commission on Radiation Protection (ICRP), reduction of dose is endeavored. The safety management during reactor shutdown is also carried out as well as it of reactor operation term. However, the

  20. Refurbishment of an Analytical Laboratory Hot Cell Facility

    International Nuclear Information System (INIS)

    Rosenberg, K.; Henslee, S.P.; Michelbacher, J.A.; Coleman, R.M.

    1997-01-01

    An Analytical Laboratory Hot Cell (ALHC) Facility at Argonne National Laboratory-West (ANL-W) was in service for nearly thirty years. In order to comply with DOE regulations governing such facilities and meet ANL-W programmatic requirements, a major refurbishment effort was undertaken. All penetrations within the facility were sealed; the ventilation system was redesigned, upgraded and replaced; the manipulators were replaced; the hot cell windows were removed, refurbished, and reinstalled; all hot cell utilities were replaced; a lead-shielded glovebox housing an Inductively Coupled Plasma - Atomic Emission Spectrometer (ICP-AES) System was interfaced with the hot cells, and a new CO2 fire suppression system and other ALHC support equipment were installed

  1. BIM applied in historical building documentation and refurbishing

    Science.gov (United States)

    Cheng, H.-M.; Yang, W.-B.; Yen, Y.-N.

    2015-08-01

    Historical building conservation raises two important issues which are documentation and refurbishing. For the recording and documentation, we already have developed 3d laser scanner and such photogrammetry technology those represent a freeze object of virtual reality by digital documentation. On the other hand, the refurbished engineering of historic building is a challenge for conservation heritage which are not only reconstructing the damage part but also restoring tangible cultural heritage. 3D digital cultural heritage models has become a topic of great interest in recent years. One reason for this is the more widespread use of laser scanning and photogrammetry for recording cultural heritage sites. These technologies have made it possible to efficiently and accurately record complex structures remotely that would not have been possible with previous survey methods. In addition to these developments, digital information systems are evolving for the presentation, analysis and archival of heritage documentation.

  2. Refurbishment of the Oregon State University rotating rack

    International Nuclear Information System (INIS)

    Higginbotham, J.F.

    1991-01-01

    TRIGA reactors have experienced operational difficulties with the rotating racks used for sample irradiation. The most common problem occurs when the rack seizes, and the corrective action taken is replacement of the rack assembly. This paper describes the symptoms leading to rack failure and a refurbishment procedure to correct the problem without replacing the rack at the Oregon State University TRIGA Reactor (OSTR) Facility. This procedure was accomplished with extraordinary results from an operational and a radiation protection standpoint. The refurbishment has extended the useful life of this reactor facility with minimal financial impact. Given the declining number of university-based research reactors, it is in the nation's best interest to maintain the currently operating research reactor facilities, and the described procedure can aid in achieving that goal

  3. Study on identification method of auto refurbishment test

    Science.gov (United States)

    Jiang, Zhenfei; Feng, Qingfu; Wang, Zhengyu; Jiang, Suqin; Chen, Xing; Zheng, Shaoyuan; Li, Bokui

    2018-04-01

    In recent years, a large number of refurbished cars inflow into the market as new cars. The traditional methods to identify refurbished cars are mostly based on experience, the subjectivity is too high and the credibility is low. In the production of automobile, the state and the automobile industry set clear standards for the thickness of the automobile paint. There is a big difference between the thickness of machine spraying and manual spraying. By studying this difference and combining with the standard, it can be identified accurately whether the car has been renovated; during the second assembly process, the surface of some parts (such as bolts) will have obvious signs of wear and tear due to the regular assembly and disassembly, it can also be identified accurately through the study of these assembly traces.

  4. Refurbishment and Automation of Thermal Vacuum Facilities at NASA/GSFC

    Science.gov (United States)

    Dunn, Jamie; Gomez, Carlos; Donohue, John; Johnson, Chris; Palmer, John; Sushon, Janet

    1999-01-01

    The thermal vacuum facilities located at the Goddard Space Flight Center (GSFC) have supported both manned and unmanned space flight since the 1960s. Of the eleven facilities, currently ten of the systems are scheduled for refurbishment or replacement as part of a five-year implementation. Expected return on investment includes the reduction in test schedules, improvements in safety of facility operations, and reduction in the personnel support required for a test. Additionally, GSFC will become a global resource renowned for expertise in thermal engineering, mechanical engineering, and for the automation of thermal vacuum facilities and tests. Automation of the thermal vacuum facilities includes the utilization of Programmable Logic Controllers (PLCs), the use of Supervisory Control and Data Acquisition (SCADA) systems, and the development of a centralized Test Data Management System. These components allow the computer control and automation of mechanical components such as valves and pumps. The project of refurbishment and automation began in 1996 and has resulted in complete computer control of one facility (Facility 281), and the integration of electronically controlled devices and PLCs in multiple others.

  5. Energy refurbishment of the Italian residential building stock: energy and cost analysis through the application of the building typology

    International Nuclear Information System (INIS)

    Ballarini, Ilaria; Corrado, Vincenzo; Madonna, Francesco; Paduos, Simona; Ravasio, Franco

    2017-01-01

    The European residential building stock is largely composed of buildings with poor energy performance, therefore basic retrofit actions could lead to significant energy savings. However, energy refurbishment measures should be identified in accurate way, taking into account the technical viability and aiming both to increase the building energy performance and to restrain the costs. The present article investigates the effects of different measures applied to the Italian residential building stock by using the building typology, which consists of 120 building types, representative of six construction ages, four building sizes and five climatic zones. A quasi-steady state model has been used to calculate the energy performance; the economic evaluation has been carried out as specified in the EU cost-optimal comparative methodology (Directive 2010/31/EU). The most effective measures and packages of measures, in terms of energy saving and global cost reduction, are identified and discussed. The results are addressed to important purposes for energy policy, as for instance: (a) to provide political authorities with the most effective energy efficiency measures as to encourage retrofit processes through the allocation of financial incentives, (b) to offer a knowledge-base for developing energy refurbishment scenarios of residential building stocks and forecasting future energy resource demand. - Highlights: • Investigation of energy savings and cost effectiveness of the Italian housing stock refurbishments. • Application of the building typology approach of the IEE-TABULA project. • Knowledge-base for bottom-up models of the building stock energy performance. • Supporting the political authorities to promote effective refurbishment measures.

  6. Was It Really Worth Pain? Refurbishment of Mercedes-Benz Trucks by Botswana Defence Force

    National Research Council Canada - National Science Library

    Rangobana, Samuel A; Alkebaisi, Hussain K

    2005-01-01

    .... Logistics statistics, for refurbished trucks returned to user units, are also gathered from the asset management software database, Mincom Ellipse, in use by the Botswana Defence Force Mechanical...

  7. Refurbishment of the IEAR1 primary coolant system piping supports

    International Nuclear Information System (INIS)

    Fainer, Gerson; Faloppa, Altair A.; Oliveira, Carlos A. de; Mattar Neto, Miguel

    2015-01-01

    A partial replacement of the IEA-R1 piping system was concluded in 2014. This paper presents the study and the structural analysis of the IEA-R1 primary circuit piping supports, considering all the changes involved in the replacement. The IEA-R1 is a nuclear reactor for research purposes designed by Babcox-Willcox that is operated by IPEN since 1957. The reactor life management and modernization program is being conducted for the last two decades and already resulted in a series of changes, especially on the reactor coolant system. This set of components, divided in primary and secondary circuit, is responsible for the circulation of water into the core to remove heat. In the ageing management program that includes regular inspection, some degradation was observed in the primary piping system. As result, the renewing of the piping system was conducted in 2014. Moreover the poor condition of some original piping supports gave rise to the refurbishment of all piping supports. The aim of the present work is to review the design of the primary system piping supports taking into account the current conditions after the changes and refurbishment. (author)

  8. Refurbishment of a Victorian terraced house for energy efficiency

    Science.gov (United States)

    Dimitriou, Angeliki

    The impacts of global warming are now obvious. The international community has committed itself to reduce CO2 emissions, the main contributor to the greenhouse effect, both at international and national levels. In the Kyoto Protocol signed in 1997, countries have committed to reduce their greenhouse gases emissions below their 1990 levels by the period 2008-2012. The UK specifically should reduce those emissions by 12.5%. Format reason, the UK has introduced a package of policies, which promote not only the use of renewable energy resources, but most importantly the reduction in energy use, with energy efficiency. Refurbishment of existing houses has and will contribute to the reduction of energy consumption. A Victorian mid-terraced house was studied in this report, and different refurbishment measures were tested, using two software programmes: TAS and SAP. The targets were to achieve certain levels of thermal comfort, to comply with the Building Regulation for building thermal elements and to achieve a high SAP rating. Then, the cost of each measure was calculated and its CO2 emissions were compared. Heat losses were mainly through the walls and roof. Roof and mainly wall refurbishment measures reduce the heating loads the most. Ground floor insulation does not contribute to the reduction of the heating loads, on the contrary it has detrimental effect in summer, where the cooling effect coming from the ground is being reduced. Window replacement achieves a very good performance in summer resulting in the reduction of overheating. Wall and roof insulation increase the SAP rating the most, between the building elements, but boiler replacement and upgrading of heating controls increase it more. According to the SAP rating, CO2 annual emissions are reduced the most by boiler replacement and then by wall and roof. The results given by the two softwares concerning which measure is more leads more to energy efficiency, are the same. Finally, if the measures which lead

  9. Refurbishment and extension of the terrace of Restaurant No.1

    CERN Multimedia

    2009-01-01

    Work to refurbish and extend part of the terrace of Restaurant No.1 started in the first week of October and should last about two months. This is just a small part of the wide-ranging site infrastructure consolidation programme that began in April 2009. The new terrace, covering a surface area of 1770 m2 (compared with 1650 m2 today), is scheduled to be completed by the end of 2010 and will run all the way around the Restaurant No.1 extension. Work on the latter will affect part of Building 501 during the period from April to October 2010. The new dining room will seat some 275 additional customers (see picture). Part of the Cedars car-park will remain closed until some time in December to provide site access for trucks transporting construction materials, plant, etc. CERN Bulletin

  10. Fuel management during Cirus refurbishing and re-commissioning

    International Nuclear Information System (INIS)

    Rai, K.K.; Srivastava, Alok; Ramesh, N.; Sharma, R.C.

    2006-01-01

    Cirus is a Heavy water moderated and Demineralised water cooled 40 MW(th) research reactor. Graphite is used as reflector. Natural uranium in metallic form and clad in aluminium is used as fuel. After over three decades of operation, signs of ageing started surfacing up. Refurbishment plan was drawn up based upon ageing studies and performance review. Core unloading was the foremost requirement for jobs like assessment of integrity of primary coolant underground pipelines. Refuelling is carried out during reactor shut down with primary coolant pumps in operation. During the fuel unloading with the gradual removal of assemblies, reduction in the gross flow of primary coolant was also envisaged. The scheme for core unloading was formulated with emphasis on optimization of fuel utilization, cooling to the fuel assemblies during transit and overall safety of equipment and personnel. After completion of refurbishing jobs, it was decided to install dummy assemblies in pile to facilitate commissioning of primary coolant system. A lot of difficulty was faced due to release of iron oxide flakes from the surface of primary coolant pipelines. The inlet feeders, valves and dummy assemblies had to be periodically flushed to get rid of iron oxide flakes deposited during the period. Various efforts made to get rid of iron oxide flakes included increasing the velocity by bypassing the core, installation of hollow dummy assemblies and installation of strainer at core inlet. The decision of fuel loading was made based upon the experience feedback with dummy assemblies and assessment of the pattern of release of iron oxide flakes. The dummy assemblies were replaced with uranium fuel assemblies. Fuelling work was carried out with Reactor hall crane with additional precautions. This paper describes the experience with handling of irradiated fuel assemblies to facilitate core unloading, experience with dummy assemblies and loading of fuel into the core and subsequent performance

  11. Performance evaluation of operational energy use in refurbishment, reuse, and conservation of heritage buildings for optimum sustainability

    Directory of Open Access Journals (Sweden)

    O.K. Akande

    2016-09-01

    Full Text Available The operational phase of a building project has increasingly gained importance with their energy performance becoming valuable and determining their operational excellence. In most heritage building projects (HBPs, the operational energy use aspects are less considered, and a systematic way of analyzing their energy performance following project delivery is often lacking. The aim of this study is to evaluate the operational performance of refurbishment and reuse of UK listed church projects. The objective is to assess the operational energy use with a view to optimizing their sustainable performance. The methodology includes eight selected case study buildings refurbished and converted for multipurpose use. The case study approach provided qualitative insights into how the study contributes to a more structured requirements for energy management in HBPs with specific attention to energy-efficient building operations. The findings show the need to focus on fundamental areas of operational management (i.e. by developing and implementing more focused policy on operational energy performance of heritage buildings to minimize the energy required to operate them. The challenges of implementing changes in operational energy performance improvement of heritage buildings are addressed in the form of recommendations that could lead to real results. The study concludes that leveraging these areas requires commitment from all heritage building stakeholders because they all have substantial roles in harmonizing the requirement for the project׳s sustainability and not just the building operators. Meanwhile, baseline project planning, periodic updating, monitoring, and managing the energy use pattern are suggested as measures that could greatly facilitate better energy performance to optimizing their sustainable reuse compared with the traditional approach of trying to improve their thermal performance.

  12. Refurbishment of the Primary Cooling System of the Puspati Triga Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ramli, S.; Zakaria, M. F.; Masood, Z. [Malaysian Nuclear Agency, Kajang (Malaysia)

    2014-08-15

    The refurbishment of the 27 year old primary cooling system of the 1 MW PUSPATI TRIGA reactor was completed in April 2010 over an eight month outage. The project was implemented with the dual objective of meeting current user needs as well as a future reactor core power upgrade. Hence the cooling system was partly modernized to cater for a 3 MW{sub th} reactor by installing higher capacity heat exchangers and pumps while maintaining the piping and valve sizes. The old 1 MW tube and shell heat exchanger, which had lost 25% of its heat exchange capacity, was replaced with two 1.5 MW plate type heat exchangers. Several manually operated valves were replaced with motorized units to allow remote operation from the control room. The installed cooling system was flushed with distilled water and then subjected to hydrostatic pressure tests. In the cold run test, the system was operated for an hour for every pump and heat exchanger combination while all operating parameters were checked. In the hot run test, the same was done at four levels of increasing reactor power, and dose measurements were also recorded. The paper gives the design, installation, testing and commissioning details of the project. (author)

  13. Energy Refurbishment of an Office Building with Hybrid Photovoltaic System and Demand-Side Management

    Directory of Open Access Journals (Sweden)

    Giovani Almeida Dávi

    2017-08-01

    Full Text Available On-site photovoltaic (PV and battery systems intend to improve buildings energy performance, however battery costs and monetary incentives are a major drawback for the introduction of these technologies into the electricity grids. This paper proposes an energy refurbishment of an office building based on multi-objective simulations. An innovative demand-side management approach is analyzed through the PV and battery control with the purpose of reducing grid power peaks and grid imported energy, as well as improving the project economy. Optimization results of load matching and grid interaction parameters, complemented with an economic analysis, are investigated in different scenarios. By means of battery use, the equivalent use of the grid connection is reduced by 12%, enhancing the grid interaction potential, and 10% of load matching rates can be increased. Project improvements indicate the grid connection capacity can be reduced by 13% and significant savings of up to 48% are achieved on yearly bills. The economy demonstrates the grid parity is only achieved for battery costs below 100 €/kWh and the payback period is large: 28 years. In the case with only PV system, the grid parity achieves better outcomes and the payback time is reduced by a half, making this a more attractive option.

  14. Refurbishment, Modernization and Ageing Management Program of The 3MW TRIGA Mark-II Research Reactor of Bangladesh

    International Nuclear Information System (INIS)

    Salam, M. A.

    2013-01-01

    The 3 MW TRIGA MK-II research reactor of Bangladesh Atomic Energy Commission (BAEC) achieved its first criticality on 14 September 1986. The reactor has been used for manpower training, radioisotope production and various R and D activities in the field of neutron activation analysis, neutron radiography and neutron scattering. Reactor Operation and Maintenance Unit (ROMU) is responsible for operation and maintenance of the research reactor. During the past twenty seven years ROMU carried out several refurbishments, replacement, modification and modernization activities in the reactor facility. The major tasks carried out under refurbishment program were replacement of the corrosion damaged N-16 decay tank by a new one, replacement of the fouled shell and tube type heat exchanger by a plate type one, modification of the shielding arrangements around the N-16 decay tank and ECCS system and solving the radial beam port-1 leakage problem. All of these refurbishment activities were performed under an annual development project (ADP) funded by Bangladesh government. BAEC research reactor (RR) was operated by analogue console system from its commissioning to July, 2011. Old analog based console has been replaced by digital console on June, 2012. Modernization program for the reactor control console due to obsolescence and unavailability of spare parts of I and C system was vital to restore the safe operation of the reactor. Considering these facts, installation of a digital control console and I and C system based on the state-of-the-art digital technology became necessary. Reactor digital console system installation tasks were performed under another ADP funded project by Bangladesh government. Now the reactor is operating with the digital control system. Besides this, the Neutron Radiography (NR) facility has been modernized by the addition of a digital neutron radiography set-up at the tangential beam port. The Neutron Scattering (NS) facility also has been upgraded

  15. Refurbishment, Modernization and Ageing Management Program of The 3MW TRIGA Mark-II Research Reactor of Bangladesh

    Energy Technology Data Exchange (ETDEWEB)

    Salam, M. A. [Atomic Energy Research Establishment, Dhaka (Bangladesh)

    2013-07-01

    The 3 MW TRIGA MK-II research reactor of Bangladesh Atomic Energy Commission (BAEC) achieved its first criticality on 14 September 1986. The reactor has been used for manpower training, radioisotope production and various R and D activities in the field of neutron activation analysis, neutron radiography and neutron scattering. Reactor Operation and Maintenance Unit (ROMU) is responsible for operation and maintenance of the research reactor. During the past twenty seven years ROMU carried out several refurbishments, replacement, modification and modernization activities in the reactor facility. The major tasks carried out under refurbishment program were replacement of the corrosion damaged N-16 decay tank by a new one, replacement of the fouled shell and tube type heat exchanger by a plate type one, modification of the shielding arrangements around the N-16 decay tank and ECCS system and solving the radial beam port-1 leakage problem. All of these refurbishment activities were performed under an annual development project (ADP) funded by Bangladesh government. BAEC research reactor (RR) was operated by analogue console system from its commissioning to July, 2011. Old analog based console has been replaced by digital console on June, 2012. Modernization program for the reactor control console due to obsolescence and unavailability of spare parts of I and C system was vital to restore the safe operation of the reactor. Considering these facts, installation of a digital control console and I and C system based on the state-of-the-art digital technology became necessary. Reactor digital console system installation tasks were performed under another ADP funded project by Bangladesh government. Now the reactor is operating with the digital control system. Besides this, the Neutron Radiography (NR) facility has been modernized by the addition of a digital neutron radiography set-up at the tangential beam port. The Neutron Scattering (NS) facility also has been upgraded

  16. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    International Nuclear Information System (INIS)

    Koonen, E.; Gubel, P.

    1994-01-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  17. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    Energy Technology Data Exchange (ETDEWEB)

    Koonen, E; Gubel, P [BR2 Department, Belgian Nuclear Research Center, CEN/SCK, Mol (Belgium)

    1993-07-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  18. The BR2 refurbishment programme: achievements and two years operation feedback

    International Nuclear Information System (INIS)

    Gubel, P.; Dekeyser, J.; Koonen, E.; Van der Auwera, J.

    1999-01-01

    The BR2 reactor was shutdown end of June 1995 for an extensive refurbishment after more than 30 years utilization. The beryllium matrix needed to be replaced and the aluminium vessel inspected for an envisaged 15 year life extension. Other aspects of the refurbishment programme aimed at the reliability and availability of the installations, safety of operation and compliance with modern safety standards. The reactor was started again in' April '97 and operated only for three cycles in 1997. These first irradiation cycles were intended as a demonstration of the safety and reliability of all components and systems after refurbishment. Also during the extended shutdowns non-critical refurbishment tasks were allowed to be continued and finalized. At the request of the Safety Authorities, some modifications and studies are still in progress without perturbation of the reactor operation. (author)

  19. Ongoing refurbishment activities and strategy for the future operation of the BR2 reactor

    International Nuclear Information System (INIS)

    Koonen, E.; Gubel, P.

    1993-01-01

    The operation of the BR2 reactor with its second Be-matrix is foreseen up to mid-1995 or mid-1996. A life extension for another 15 years is envisaged considering programmatic, financial and technical aspects. At present, the second phase of the refurbishment programme is being executed. The major activities of this programme can be grouped under two headings: safety reassessment and ageing issues. The expected outcome end '93 is an assessment report defining extent, choosen options, prioritized activities, budget and a tentative planning for the preparation and execution of the refurbishment. These aspects together with the prospects of possible cooperation with other parties for the refurbishment programme and the future operation of BR2 will be evaluated by the CEN/SCK Board who has to take a decision early in 1994. Various scenarios are now being considered and evaluated for the refurbishment and the future BR2 operation regime. (author)

  20. Refurbishment, core conversion and safety analysis of Apsara reactor

    Energy Technology Data Exchange (ETDEWEB)

    Raina, V.K.; Sasidharan, K.; Sengupta, S. [Bhabha Atomic Research Centre, Mumbai (India)]. E-mail: nram@@apsara.barc.ernet.in

    1998-07-01

    Apsara, a 1 MWt pool type reactor using HEU fuel has been in operation at the Bhabha Atomic Research Centre, Trombay since 1956. In view of the long service period seen by the reactor it is now planned to carry out extensive refurbishment of the reactor with a view to extend its useful life. It is also proposed to modify the design of the reactor wherein the core will be surrounded by a heavy water reflector tank to obtain a good thermal neutron flux over a large radial distance from the core. Beam holes and the majority of the irradiation facilities will be located inside the reflector tank. The coolant flow direction through the core will be changed from the existing upward flow to downward flow. A delay tank, located inside the pool, is provided to facilitate decay of short lived radioactivity in the coolant outlet from the core in order to bring down radiation field in the operating areas. Analysis of various anticipated operational occurrences and accident conditions like loss of normal power, core coolant flow bypass, fuel channel blockage and degradation of primary coolant pressure boundary have been performed for the proposed design. Details of the proposed design modifications and the safety analyses are given in the paper. (author)

  1. Major Refurbishment of the University of Florida Training Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Joradn, Kelly; Berglund, Matthew; Shea, Brian [Univ., of Florida, Florida (United States)

    2013-07-01

    The research reactor fleet is aging with few replacements being built. At the same time the technology for refurbishment of the older reactors has advanced well beyond that of currently installed equipment. The disparity between new and old technology results in an inability to find simple replacements for the older, highly integrated components. The lack of comprehensive guidance for digital equipment adds to the technical problems of installing individual replacement parts. Up to this point, no U. S. facilities have attempted a complete modernization effort because of the time commitment, financial burden, and licensing required for a total upgrade. The University of Florida Training Reactor is tackling this problem with a replacement of nearly all of the major facility sub-systems, including electrical distribution, reactor controls, nuclear instrumentation, security, building management, and environmental controls. This approach offers increased flexibility over the piece-by-piece replacement method by leveraging modern control systems based on global standards and capable of good data interchange with higher levels of redundancy. The UFTR reviewed numerous technologies to arrive at the final system architecture and this 'clean-slate' installation methodology. It is this concept of total system replacement and strict use of modular, open-standards technology that has allowed for a facility design that will be easy to install, maintain, and build upon over time.

  2. Acoustical qualification of Teatro Nuovo in Spoleto before refurbishing works

    Science.gov (United States)

    Cocchi, Alessandro; Cesare Consumi, Marco; Shimokura, Ryota

    2004-05-01

    To qualify the acoustical quality of an opera house two different approaches are now available: one is based on responses of qualified listeners (subjective judgments) compared with objective values of selected parameters, the other on comparison tests conducted in suited rooms and on a model of the auditory brain system (preference). In the occasion of the refurbishment of an opera house known for the Two Worlds Festival edited yearly by the Italian Composer G. C. Menotti, a large number of measurements were taken with different techniques, so it is possible to compare the different methods and also the results with some geometrical criterion, based on the most simple rules of musical harmony, now neglected as our attention is attracted to computer simulations, computer aided measurement techniques and similar modern methods. From this work some link between well known acoustical parameters (not known at the time when architects sketched the shape of ancient opera houses) and geometrical criteria (well known at the time when ancient opera houses were built) will be shown.

  3. Major Refurbishment of the University of Florida Training Reactor

    International Nuclear Information System (INIS)

    Joradn, Kelly; Berglund, Matthew; Shea, Brian

    2013-01-01

    The research reactor fleet is aging with few replacements being built. At the same time the technology for refurbishment of the older reactors has advanced well beyond that of currently installed equipment. The disparity between new and old technology results in an inability to find simple replacements for the older, highly integrated components. The lack of comprehensive guidance for digital equipment adds to the technical problems of installing individual replacement parts. Up to this point, no U. S. facilities have attempted a complete modernization effort because of the time commitment, financial burden, and licensing required for a total upgrade. The University of Florida Training Reactor is tackling this problem with a replacement of nearly all of the major facility sub-systems, including electrical distribution, reactor controls, nuclear instrumentation, security, building management, and environmental controls. This approach offers increased flexibility over the piece-by-piece replacement method by leveraging modern control systems based on global standards and capable of good data interchange with higher levels of redundancy. The UFTR reviewed numerous technologies to arrive at the final system architecture and this 'clean-slate' installation methodology. It is this concept of total system replacement and strict use of modular, open-standards technology that has allowed for a facility design that will be easy to install, maintain, and build upon over time

  4. Modernization and Refurbishment of the RECH-1 Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Daie, J. [Nuclear Application Department, Chilean Nuclear Energy Commission (CCHEN), Santiago (Chile)

    2014-08-15

    The Chilean Nuclear Energy Commission (Comisión Chilena de Energía Nuclear, or CCHEN) has operated the RECH-1 research reactor since 1974. This reactor is located at La Reina Nuclear Centre in Santiago, Chile. It is a pool type reactor using LEU MTR fuel assemblies, light water as moderator and coolant, and beryllium as reflector. The reactor has been operated at the nominal power of 5 MW in a continuous shift of 20 hours per week, 48 weeks per year. The main utilizations of the RECH-1 reactor are radioisotope production and neutron activation analysis. Among the most relevant refurbishment and modernization campaigns undertaken at the reactor are: full core conversion to the use of LEU fuel, replacement of the cooling tower, improvement of the containment building by changing the doors and gates and by a better sealant for the penetrations, introduction of an additional source of water by connecting the raw water supply system to the emergency cooling system, improvement of the emergency ventilation system, introduction of a fire detection and alarm system for detection and mitigation to protect the I&C racks, introduction of a radioactive liquid release for those generated at the reactor, introduction of a delay tank degasification system and renewal of the environmental monitoring system. At present we are assessing the possibility of replacing the old analog electronics of control for new digital systems. Detailed descriptions of these diverse activities are presented in the paper. (author)

  5. Shakedown Tests for Refurbished and Upgraded Frames and Initiation of Alloy 709 Creep Rupture Tests

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Hong [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Moser, Jeremy L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hawkins, Charles S. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Lara-Curzio, Edgar [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    This report describes the shakedown tests conducted on the upgraded frames, and initiation of creep rupture tests on refurbished frames. SS316H, a reference material for Alloy 709, was used in shakedown tests, and the tests were conducted at 816 degree C under three stress levels to accumulate 1% creep strain. 1/4” gage diameter specimen design was used. The creep rupture tests on Alloy 709 were initiated at 600 degree C under 330 MPa to target 1,500 h rupture time. 12 specimens with 3/8” gage diameter were prepared from the materials with 6 heat treatment conditions, 2 from each. The required mechanical load under 330MPa was calculated to be 5,286 lb for the 3/8” gage diameter specimen. Among the ART frames, 7 frames are equipped with 10,000 lb load cell including #5 to 8 and #88 to 90, and can be used. 7 tests were thus started in this stage of project, and remaining 5 will be continued whenever any of the 7 tests is completed.

  6. Steam generator life-management, reliability, maintenance and refurbishment

    International Nuclear Information System (INIS)

    Spekkens, P.

    2012-01-01

    SGC 2012 is a different kind of a conference - it has its own focus, initiatives and objectives and differs from its predecessors. It originated as the Steam Generator and Heat Exchanger Conference in 1990 - a time when premature degradation of steam generators with Alloy 600 tubes was rampant world-wide, and some CANDU steam generators had started to experience significant fouling and corrosion issues. The six previous steam generator conferences were held on a regular cycle, in a very similar format and with a similar theme. We are now in a different era in steam generators. The Alloy 600 tubing has been largely replaced by more robust materials, and the CANDU steam generators have been brought under much more intense and effective life cycle management. Performance of steam generators has improved greatly, and they are no longer considered at risk of limiting the life of the units. Indeed, most Incoloy 800 steam generators in CANDU units are considered to be capable of operating reliably through the 'second life' of the units and are not being replaced during refurbishments. Given this changing environment, the scope of this conference has been expanded from one to three areas: steam generators and heat exchangers as before, but also; controls, valves and pumps, and; reactor components and systems, Programs A, B and C, respectively. The conference is targeting to address the needs and interests of the operating utilities, and to 'focus on what needs attention'. As a means of 'focusing on what needs attention' an 'Issue-Identification and Definition' program was initiated last winter. The Issue-Identification Team operating with COG President Bob Morrison as its Executive Lead, worked to identify issues requiring attention in the three areas of interest. Of the many issues identified by the Team and elaborated on by the Program Developers of this conference, four were recommended for special attention: A. 'Operate Clean - Build Clean - Plant Wide': Despite their

  7. Products, practices and processes: exploring the innovation potential for low-carbon housing refurbishment among small and medium-sized enterprises (SMEs) in the UK construction industry

    International Nuclear Information System (INIS)

    Killip, Gavin

    2013-01-01

    Scenario-based studies agree that the technical potential for CO 2 emissions reduction from the housing stock is large. This paper explores how a market might be developed for the refurbishment activities assumed in these scenarios, taking the existing market for repair, maintenance and improvement (RMI) as its starting point. Interviews with 16 small and medium-sized enterprises (SMEs) in the construction industry reveal the interdependence of products, practices and processes in housing renovation activities. Conservative practice as well as innovation can be understood as the outcome of multi-lateral influences on firms from other firms, clients, the material buildings and products in their working lives, and from regulations and regulators. Contractors' openness to innovation is contingent on an informal approach to risk assessment, taking account of cost, time efficiency, client demands, and installer confidence in the reliability of the resulting work. The implications of the research are discussed in relation to the need for new practices and processes on refurbishment projects, raising questions for future research on key questions of quality assurance, performance over time, the application of standards, and vocational training. -- Highlights: •Repair, maintenance and improvement works are triggers for low-carbon refurbishment. •Millions of property owners and small firms make for fragmented decision-making. •Actor-Network Theory is used to frame decision-making processes for refurbishment. •Small builders can be innovative if clients allow time and money for experimentation. •Energy policy for existing homes needs to engage with the construction sector

  8. System impact of energy efficient building refurbishment within a district heated region

    International Nuclear Information System (INIS)

    Lidberg, T.; Olofsson, T.; Trygg, L.

    2016-01-01

    The energy efficiency of the European building stock needs to be increased in order to fulfill the climate goals of the European Union. To be able to evaluate the impact of energy efficient refurbishment in matters of greenhouse gas emissions, it is necessary to apply a system perspective where not only the building but also the surrounding energy system is taken into consideration. This study examines the impact that energy efficient refurbishment of multi-family buildings has on the district heating and the electricity production. It also investigates the impact on electricity utilization and emissions of greenhouse gases. The results from the simulation of four energy efficiency building refurbishment packages were used to evaluate the impact on the district heating system. The packages were chosen to show the difference between refurbishment actions that increase the use of electricity when lowering the heat demand, and actions that lower the heat demand without increasing the electricity use. The energy system cost optimization modeling tool MODEST (Model for Optimization of Dynamic Energy Systems with Time-Dependent Components and Boundary Conditions) was used. When comparing two refurbishment packages with the same annual district heating use, this study shows that a package including changes in the building envelope decreases the greenhouse gas emissions more than a package including ventilation measures. - Highlights: • Choice of building refurbishment measures leads to differences in system impact. • Building refurbishment in district heating systems reduces co-produced electricity. • Valuing biomass as a limited resource is crucial when assessing global GHG impact. • Building envelope measures decrease GHG (greenhouse gas) emissions more than ventilation measures.

  9. The impact of building orientation and discount rates on a Portuguese reference building refurbishment decision

    International Nuclear Information System (INIS)

    Brandão de Vasconcelos, Ana; Cabaço, António; Pinheiro, Manuel Duarte; Manso, Armando

    2016-01-01

    Refurbishment, as part of the construction industry, has a strong global impact, not only from the viewpoint of economies but also from social and energy-efficiency perspectives. A thermal refurbishment process, in particular, involves numerous decisions and choices; the decision-makers being ultimately confronted with two major questions: which criterion should be adopted in the choice of the refurbishment construction solutions and which refurbishment construction solutions should be chosen? In this paper, a criterion based on technical and economic points of view is proposed, aiming to identify the cost-optimal package of energy efficient solutions from among a set of possible refurbishment measures, within the life cycle of buildings. Sensitivity analyses are also performed so that the results may help the decision-maker choose the appropriate refurbishment solutions to be adopted when different discount rates and building orientations are taken into consideration. A total of seven scenarios, for a macroeconomic perspective, and nine, for a financial perspective, are performed. The costoptimal methodology adopted, following the Directive 2010/31/EU (2010) recommendations, is applied to a Portuguese reference building. The analysis carried out allows obtaining low global life cycle costs solutions and points towards nearly Zero Energy Building (nZEB) concept. The results are important for drawing national political instruments on buildings energy efficiency. - Highlights: •Building refurbishment decision based on technical and economic points of view. •35.000 Packages of thermal rehabilitation solutions considered. •Building orientation and discount rate impact on the cost-optimal package of solutions. •Portuguese reference building case base.

  10. The effects of acoustical refurbishment of classrooms on teachers’ perceived noise exposure and noise-related health symptoms

    DEFF Research Database (Denmark)

    Kristiansen, Jesper; Lund, Søren Peter; Persson, Roger

    2015-01-01

    lessons with circa 2 dB(A) in both schools. Conclusion: The acoustical refurbishment was associated with a reduction in classroom reverberation time and activity sound levels in both schools. The acoustical refurbishment was associated with a reduction in the teachers’ perceived noise exposure...... of RT and activity sound levels were measured before and after refurbishment. Data on perceived noise exposure, disturbance attributed to different noise sources, voice symptoms, and fatigue after work were collected over a year in a total of six consecutive questionnaires. Results: Refurbished......, the mean classroom reverberation time was 0.68 (school A) and 0.57 (school B) and 0.55 s in sham refurbished classrooms. After refurbishment, the RT was approximately 0.4 s in both schools. Activity sound level measurements confirmed that the intervention had reduced the equivalent sound levels during...

  11. Refurbishment programme of the reactor and progress of work

    International Nuclear Information System (INIS)

    Astruc, J.M.

    1992-01-01

    During 20 years of operation, since its start-up the ILL there have been some problems, like ruptured heavy water collector, in the upper part of the reflector tank, replacement of all the beam tubes due to the evolution of the mechanical characteristics of the aluminium alloy under irradiation. Some days after regular shutdown for maintenance, an inspection of the internal elements of the reactor discovered cracks on the grids which ensure the regular flow of cooling water. The investigations showed that the cracks are due to a design fault, aggravated by the effects of mechanical fatigue on highly irradiated material. It was not possible to repair the cracked grid, and it had to be replaced. This involved the dismantling of the internals parts of the reactor tank. The reactor refurbishment programme was set up. It provides for the replacement of the reactor block, the coupling sleeves, the anti turbulence grids and the diffuser, and of the ancillary elements. The main items to be replaced are: the reactor block consisting of the reactor vessel and its cover, known as the 'upper structure'; the heavy water collectors; connecting sleeves between the reactor block and the flanges of the various beam tubes. These three items constitute the primary circuit in the swimming pool. It is also planned to replace some internal parts of the reactor tank, such as the beam-tubes, the grid and diffuser and the chimney. Some parts of the present reactor, which are not at the end of their life, would be reused, for instance the two cold sources, the safety rods, and some other pieces. The parts replaced would be cut up and packaged in accordance with current standards and disposed of. All items are in principle to be replaced by identical equipment. This concerns in particular performance, mechanical characteristics and the choice of materials. The replacement of the reactor block necessitates a complete dismantling of the equipment in the reactor block, and of the structures in

  12. Structural radioactive waste from 'retubing/refurbishment' of Embalse nuclear power plant. Regulatory perspective

    International Nuclear Information System (INIS)

    Alvarez, Daniela E.; Lee Gonzales, Horacio M.; Medici, Marcela A.; Piumetti, Elsa H.

    2009-01-01

    Unlike the building of a new nuclear reactor, the 'retubing / refurbishment' of nuclear reactors that have been in operation for many years, involves the replacement of components in a radioactive environment. This requires a carefully planned radiation protection program to ensure protection of workers, the public and the environment as well as a radioactive waste management program for those radioactive waste generated during the process, which go beyond those generated during the normal operation and maintenance of the plant. Nucleoelectrica Argentina Sociedad Anonima (NA-SA) is scheduled to conduct the Life Extension Process of Embalse Nuclear Power Plant (CNE) which essentially consist of 'retubing / refurbishment' of the installation. The Nuclear Regulatory Authority (ARN) will then have an important activity related to the above process. In particular, this paper will describe some points of interest related to the generation and management of radioactive waste during the 'retubing / refurbishment' of the CNE, from the regulatory point of view. (author)

  13. Analysis of the cost for the refurbishment of small hydropower plants

    International Nuclear Information System (INIS)

    Ogayar, B.; Vidal, P.G.; Hernandez, J.C.

    2009-01-01

    In view of all the concerns associated with fossil fuels and energy demand it is appropriate to investigate the large number of abandoned small hydropower plants. In order to solve the difficulty implied, by a viability study on the refurbishment of a small hydropower plant, a series of simple equations has been developed based on the economic optimization of the different elements. These equations can also be used for completely new hydropower plants. The result of this study will allow us to obtain quite approximate costs for the refurbishment of old hydropower plants, or the construction of new ones. These data on costs will act as a reference to examine real possibilities of refurbishment through different tools of financial and economic analysis. Although the equations developed have used unitary prices referring to Spain, they will be applicable to other countries just changing those prices for those of the country, required. (author)

  14. Making the home consume less - putting energy efficiency on the refurbishment agenda

    Energy Technology Data Exchange (ETDEWEB)

    Stiess, Immanuel; Deffner, Jutta (Inst. for Social-Ecological Research ISOE GmbH (Germany)). e-mail: stiess@isoe.de; Zundel, Stefan (Lausitz Univ. of Applied Sciences (Germany))

    2009-07-01

    Private home owners can reduce their energy use significantly and move towards a low carbon lifestyle by retrofitting their homes in an energy efficient standard. Despite high awareness for energy efficiency and rising energy prices, home owners only slowly take this opportunity to cut down their personal energy use and carbon emission significantly. In many cases, maintenance and repair activities only result in incremental improvements of energy efficiency. Thus, the dynamics of refurbishment seems to have a conservative bias. Against this background, we will present results from an empirical survey, focussing on home owners' maintenance and refurbishment decisions. Drawing on approaches from social-psychology, lifestyle analysis and evolutionary economics, we will explore the impact of attitudes, lifestyle orientations, cognitive frameworks and social resources on refurbishment decision especially on energy efficient ones and present a model integrating the most important driving factors.

  15. Refurbishing of a Freeze Drying Machine, used in Nuclear Medicine for Radiopharmaceuticals Production

    International Nuclear Information System (INIS)

    Gaytan-Gallardo, E.; Desales-Galeana, G.

    2006-01-01

    The refurbishing of a freeze drying machine used in the radiopharmaceuticals production, applied in nuclear medicine in the Radioactive Materials Department of the Nuclear Research National Institute in Mexico (ININ in Spanish), is presented. The freeze drying machine was acquired in the 80's decade and some components started having problems. Then it was necessary to refurbish this equipment by changing old cam-type temperature controllers and outdated recording devices, developing a sophisticated software system that substitutes those devices. The system is composed by a freeze drying machine by Hull, AC output modules for improved temperature control, a commercial data acquisition card, and the software system

  16. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production case studies

    Energy Technology Data Exchange (ETDEWEB)

    P. Grammelis; N. Koukouzas; G. Skodras; E. Kakaras; A. Tumanovsky; V. Kotler [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), Ptolemaida (Greece)

    2006-11-15

    The paper reviews the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and presents two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NOx abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new circulating fluidized bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station. 11 refs., 15 figs., 7 tabs.

  17. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities

  18. Building performance simulation as a design tool for refurbishment of buildings

    NARCIS (Netherlands)

    Hensen, J.L.M.; Bartak, M.; Drkal, F.; Dunovska, T.; Lain, M.; Matuska, T.; Schwarzer, J.; Sourek, B.; Bednar, T.

    2004-01-01

    This paper attempts to outline the current state-of-the-art regarding the use of building performance simulation as a design tool for refurbishment of buildings. This is illus-trated by means of three recent studies for conversion of historical buildings (an early 20th century factory, and a water

  19. Refurbishment of the regulating and control equipment, Task 3.08/04-05

    International Nuclear Information System (INIS)

    Nikolic, M.; Popovic, B.

    1963-01-01

    In addition to the planned refurbishment and maintenance of the RA reactor control and regulating systems, this report describes the maintenance of the reactor protection and safety systems. According to the instructions included in this report the components of these systems were tested to verify their reliability

  20. Physicochemical characteristics and occupational exposure to coarse, fine and ultrafine particles during building refurbishment activities

    Energy Technology Data Exchange (ETDEWEB)

    Azarmi, Farhad; Kumar, Prashant, E-mail: p.kumar@surrey.ac.uk, E-mail: prashant.kumar@cantab.net; Mulheron, Mike [University of Surrey, Department of Civil and Environmental Engineering, Faculty of Engineering and Physical Sciences (United Kingdom); Colaux, Julien L.; Jeynes, Chris [University of Surrey, Faculty of Engineering and Physical Sciences, Ion Beam Centre (United Kingdom); Adhami, Siavash; Watts, John F. [University of Surrey, The Surface Analysis Laboratory, Faculty of Engineering and Physical Sciences (United Kingdom)

    2015-08-15

    Understanding of the emissions of coarse (PM{sub 10} ≤10 μm), fine (PM{sub 2.5} ≤2.5 μm) and ultrafine particles (UFP <100 nm) from refurbishment activities and their dispersion into the nearby environment is of primary importance for developing efficient risk assessment and management strategies in the construction and demolition industry. This study investigates the release, occupational exposure and physicochemical properties of particulate matter, including UFPs, from over 20 different refurbishment activities occurring at an operational building site. Particles were measured in the 5–10,000-nm-size range using a fast response differential mobility spectrometer and a GRIMM particle spectrometer for 55 h over 8 days. The UFPs were found to account for >90 % of the total particle number concentrations and <10 % of the total mass concentrations released during the recorded activities. The highest UFP concentrations were 4860, 740, 650 and 500 times above the background value during wall-chasing, drilling, cementing and general demolition activities, respectively. Scanning electron microscopy, X-ray photoelectron spectroscopy and ion beam analysis were used to identify physicochemical characteristics of particles and attribute them to probable sources considering the size and the nature of the particles. The results confirm that refurbishment activities produce significant levels (both number and mass) of airborne particles, indicating a need to develop appropriate regulations for the control of occupational exposure of operatives undertaking building refurbishment.

  1. A Guide to Energy Efficient Refurbishment. Maintenance and Renewal in Educational Buildings. Building Bulletin 73.

    Science.gov (United States)

    Department for Education and Employment, London (England). Architects and Building Branch.

    With little or relatively modest investment, schools being refurbished or undergoing maintenance can make disproportionately large gains in energy efficiency that can also result in large financial savings. This document offers guidance on the selection of appropriate measures that can improve a facility's energy efficiency, depending on the type…

  2. An Overview of Ageing Management and Refurbishment of Research Reactors at Trombay

    Energy Technology Data Exchange (ETDEWEB)

    Sharma, R. C.; Raina, V. K. [Bhabha Atomic Research Centre, Mumbai (India)

    2014-08-15

    Three nuclear research reactors have been in operation at Bhabha Atomic Research Centre, Mumbai, India. India has a rich experience of about 120 research reactor operating years including ageing management. A well structured programme is in force for plant life management, refurbishment and upgrading reactors in operation. Apsara, commissioned in August 1956, was the first research reactor. Apsara is a 1 MW{sub th} swimming pool type of reactor with a movable core loaded with enriched uranium fuel and immersed in demineralized light water pool, which serves as coolant, moderator and reflector besides providing radiation shielding. Apsara was shut down during May 2009 for partial decommissioning and upgrading to a 2 MW reactor with several safety upgrades, e.g. a LEU based reactor core with higher neutron flux, a new reactor building meeting seismic qualification criteria and two independent shutdown devices. Cirus, a 40 MW{sub th} tank type reactor utilizing heavy water as moderator, graphite as reflector, demineralized light water as primary coolant and natural uranium metal as fuel; has been in operation since 1960. After about three decade of operation, the availability factor started declining mainly due to outage of equipment exhibiting signs of ageing. After ageing studies and performance review, refurbishment requirements were identified. A programme for refurbishment was drawn that included safety upgrades like civil repairs to the emergency storage reservoir to meet seismic qualification criteria and a new iodine removal system for better efficiency. The reactor was shut down during 1997 for execution of this refurbishment programme. After completion of refurbishment, the reactor was brought back into operation during 2003. It has completed about seven years of safe operation after refurbishment with a significant increase in availability factor from 70% to about 90%. The reactor was permanently shut down during December 2010. The reactor core was unloaded

  3. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13

    International Nuclear Information System (INIS)

    Ninkovic, M.

    1963-01-01

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system

  4. Refurbishment and optimisation of the district heating system and the Morettina central heating station in Locarno, Switzerland; Sanierung und Optimierung des Waermeverbundes und der Heizzentrale Morettina in Locarno. Erfolgskontrolle der Betriebsoptimierung

    Energy Technology Data Exchange (ETDEWEB)

    Lanz, S. [Dr. Eicher und Pauli AG, Berne (Switzerland); Ceschi, P. A. [Calore SA, c/o S.E.S., Locarno (Switzerland)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) discusses the successful operational optimisation of a district heating system in Locarno in southern Switzerland. The system supplies various public and private buildings with heat and cold. This pilot installation features boilers fired with liquefied gas, a combined heat and power unit and a combined heat-pump/refrigeration system. The refurbishment of the installations after three years of operation is described, which included changes to the system's hydraulics and control system as well as improvements to various sub-stations in the heating network. The results of the refurbishment, including better co-ordination of the various aggregates and lower operating temperatures, are discussed. Recommendations are also made on the planning, organisation and operation of future projects of this type.

  5. Demolish or refurbish – Environmental benefits of housing conservation

    Directory of Open Access Journals (Sweden)

    Grace Ding

    2013-06-01

    Full Text Available Climate change and energy efficiency are some of the most pressing issues facing China today. With its economic growth since 1978, the government has struggled to contain environmental damages and social unrest related to the economy’s rapid transformation. With the rapid growth in population and urbanization the demand for housing has escalated and traditional housing has been under threat of demolition to make way for new construction. Traditional housing is generally considered wasteful in its use of land and/or energy, and is often demolished for more intensive and more energy-efficient housing, despite the resulting loss of embodied energy and urban amenity. A research project was undertaken to study the environmental performance of traditional housing in Hangzhou. The project looks into analyzing and comparing embodied energy and CO2 for seven dwellings. In addition indoor climate data were recorded and collected in the form of hourly temperature and humidity readings for one year in six local houses and in a modern unit as a control for one year. The research results reveal that there is little difference in environmental performance between traditional and conventional modern construction and the value of conservation rather than demolition as a strategic development for the construction industry.

  6. Decision-making process to shut down, refurbish/modify, or decommission research reactors

    International Nuclear Information System (INIS)

    Stover, R.L.; Murphie, W.E.

    1992-01-01

    Most US research reactors were built more than 20 years ago and some more than 40 years ago. Many have undergone refurbishments and modifications to update their safety systems and experimental capabilities. But changing safety bases, social concerns, and budget constraints have required research reactor operators to continually make decisions to shut down or refurbish/modify their facilities. These decisions involve potential replacement of reactor equipment that has reached its lifetime limits. Changes in philosophy and operation of the reactors are also factors to be considered. In this paper, each of the four factors involved in the decision-making process are discussed in detail. Then, several examples from DOE research reactors in the United States are discussed. Finally, some general conclusions are given to aid in the decision-making process

  7. Refurbish research and test reactors corresponding to global age of nuclear energy

    International Nuclear Information System (INIS)

    Mishima, Kaichiro; Oyama, Yukio; Okamoto, Koji; Yamana, Hajime; Yamaguchi, Akira

    2011-01-01

    This special article featured arguments for refurbishment of research and test reactors corresponding to global age of nuclear energy, based on the report: 'Investigation of research facilities necessary for future joint usage' issued by the special committee of Atomic Energy Society of Japan (AESJ) in September 2010. It consisted of six papers titled as 'Introduction-establishment of AESJ special committee for investigation', 'State of research and test reactors in Japan', 'State of overseas research and test reactors', 'Needs analysis for research and test reactors', 'Proposal of AESJ special committee' and 'Summary and future issues'. In order to develop human resources and promote research and development needed in global age of nuclear energy, research and test reactors would be refurbished as an Asian regional center of excellence. (T. Tanaka)

  8. Refurbishment and upgrading of Iron Gates I Hydroelectric and Navigation System on the Danube River

    International Nuclear Information System (INIS)

    Scvortov, F.; Vasiliu, A.; Rosca, N.

    1996-01-01

    This work shows the problems of the refurbishing the hydroelectric units of the Iron Gates 1 Hydroelectric and Navigation System, operating since 1970. Their long and intensive utilization leads to the necessity of their refurbishment. One is demonstrated by detailed studies that it is sensible and efficient to perform both rehabilitation of the existent hydroelectric units and their power increasing from 175 MW to 190 MW, and prior to all these, as a first step, to install an additional hydroelectric unit (G7) for each system with a capacity of 190 MW. Complex technical and energetic-economical problems appear in realizing this objective due to the necessity of analysing a great volume of data in view of taking a correct decision. (author). 7 figs

  9. Bruce A refurbishment - preparatory work completed, major tasks to begin soon

    International Nuclear Information System (INIS)

    Boyd, F.

    2006-01-01

    Over the past year Bruce Power has been planning and organizing for an extensive refurbishment of the Units 1 and 2 of the Bruce A station. Now the company and its several major contractors are ready to proceed with the most challenging aspects of the actual work. The largest tasks are the replacement of the 8 steam generators and of the 480 complete fuel channels in each unit Bruce Power has created a separate website connected to their basic one to provide ongoing information about the progress of the work. The following brief note is intended to provide an outline of this challenging refurbishment program and to invite readers to visit this website to follow its progress. To provide background the writer was accorded an informative and interesting tour of the units by Rob Liddle, of Bruce Power, on September 28, 2006 the day after the ceremony commemorating the Douglas Point station held at the Bruce site. (author)

  10. The Role of Laser Additive Manufacturing Methods of Metals in Repair, Refurbishment and Remanufacturing - Enabling Circular Economy

    Science.gov (United States)

    Leino, Maija; Pekkarinen, Joonas; Soukka, Risto

    Circular economy is an economy model where products, components, and materials are aimed to be kept at their highest utility and value at all times. Repair, refurbishment and remanufacturing processes are procedures aiming at returning the value of the product during its life cycle. Additive manufacturing (AM) is expected to be an enabling technology in circular economy based business models. One of AM process that enables repair, refurbishment and remanufacturing is Directed Energy Deposition. Respectively Powder Bed Fusion enables manufacturing of replacement components on demand. The aim of this study is to identify the current research findings and state of art of utilizing AM in repair, refurbishment and remanufacturing processes of metallic products. The focus is in identifying possibilities of AM in promotion of circular economy and expected environmental benefits based on the found literature. Results of the study indicate significant potential in utilizing AM in repair, refurbishment and remanufacturing activities.

  11. On Stakeholders and the Decision Making Process Concerning Sustainable Renovation and Refurbishment in Sweden, Denmark and Cyprus

    DEFF Research Database (Denmark)

    Gohardani, Navid; Björk, Folke; Jensen, Per Anker

    2013-01-01

    This article examines the decision making process related to sustainable renovation and refurbishment in buildings. The utilized methodology identifies three distinct phases in order to instigate an engagement in sustainable renovation, by means of questionnaires and semi-structured interviews...

  12. Thermal protection and refurbishment of an old building. Lectures; Waermeschutz und Altbausanierung. Vortraege

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    Within the 22nd Hanseatic Reconstruction Symposium at the Baltic Seaside Heringsdorf/Usedom (Federal Republic of Germany) from 3rd to 5th November 2011, the following lectures were held: (1) Energetic refurbishment possibilities for building within existing properties by means of representative examples (F. Deitschum); (2) Constructional thermal insulation and indoor climate - for the good of the environment? (S. Groer); (3) Innovative insulating materials for the structural refurbishment? (O. Fechner); (4) Energetic half-timbering refurbishment (K. Lissner); (5) Wooden solar facades for existing buildings (U. Schwarz); (6) Timber beam bowls in a historic brickwork (U. Mueller); (7) Timber beam bowls and interior insulation (U. Ruisinger); (8) Innovative solutions for cavity filling insulations (A. Stefenelli); (9) Thermal insulating plaster - also for historical buildings (T. Stahl); (10) Experimental tension analysis of the structural behaviour of historical cross vaults (A.-J. Petereit); (10) Investigation of the increase of the flexural strength of stonework constructions with self-compacting steel fibre reinforced concrete (D. Haessler); (11) Dry and dense - the modified WTA leaflet 4-6, 'Subsequent sealing of components in contact with soil' - Content and innovations (R. Spirgatis); (12) What does the new standard DIN 68800 hold? (H. Willeitner); (13) News from the standard DIN 18195 waterproofing of buildings (H.-P. Sommer); (14) Liability of planning of the offering entrepreneur (H. Immoor); (15) Climate change and preservation of structures (W. Zillig); (16) Typical problems and deficiencies of the energetic refurbishment of old store buildings (H. Boehmer); (17) When do ex post horizontal sealings with injection agents make sense - Fundamentals for evaluation, planning and execution (F.-J. Hoelzen); (18) Drying up behaviour of stonework of different quality and at different variants of insulation (F. Antretter).

  13. Refurbishment of the transportation equipment, Task 3.08/04-10

    International Nuclear Information System (INIS)

    Nikolic, M.; Bratic, A.

    1963-01-01

    Transportation equipment at the RA reactor includes the bridge crane in the reactor hall, another smaller crane, bridge crane in spent fuel storage space, crane for handling the fuel containers n the room 099 and cart of the transportation channel. Regular testing and maintenance during reactor operation was not considered sufficient, and for that reason the repair and maintenance actions were done during the refurbishment of the reactor while it has been shut-down

  14. Refurbishment of BR2 (Phase 4 and 5)[1997 Scientific Report of the Belgian Nuclear Research Centre

    Energy Technology Data Exchange (ETDEWEB)

    Gubel, P.; Dekeyser, J.; Van der Auwera, J.

    1998-07-01

    The extensive refurbishment of the BR-2 materials testing reactor should allow another 10 to 15years of continued operation. The refurbishment programme is required in order to comply with modern safety standards, to enhance the reliability of operation, and to compensate for the ageing of the installations of a facility that has reached about 35 years of intensive service. The main objectives and achievements of phase 4 and 5 are described.

  15. Refurbishment and school buildings management in a smart building environment

    Science.gov (United States)

    Di Giuda, Giuseppe Martino; Villa, Valentina; Tagliabue, Lavinia Chiara; Giana, Paolo Ettore; Rinaldi, Stefano; Ciribini, Angelo Luigi Camillo

    2018-05-01

    Building Information Modelling is a methodology, which is able to take into account many data, both geometrical and non-geometrical, in order to evaluate at the actual condition of the asset. The project has the scope of evaluating the conditions of different school buildings, in order to develop a way to choose the best-tailored management solution to the owner. A further step is the management and planning of design solutions during the life cycle customized on monitored buildings' conditions. The research work focuses on providing a support decisions concerning the gap between the present building state laws and the current state of the existing buildings. The process will be developed in an expanded BIM environment, using sensors, which will give back the state of the consistency of the actual conditions to enable the buildings to adapt themselves in the best way into their specific constraints and boundaries. The results of the study are (i) a complete workflow to make decision and the possibility to shape the decision process on an objective through a scientific approach, (ii) evaluate the current state of the asset and (iii) manage maintenance in the lifespan. Further development will take in consideration all the aspects related to management of big data environment generated by a smart buildings system.

  16. Refurbishment of isolation room and development of glove box for the DUPIC project in IMEF

    International Nuclear Information System (INIS)

    Baek, S. Y.; Park, J. J.; Lee, H. H.; Hong, K. P.; Yang, M. S.; Min, D. K.

    2001-01-01

    To perform R and D of DUPIC (Direct Use of Spent PWR Fuel in CANDU Reactors), the high-radioactive shielding facility is necessary. IMEF(Irradiated Material Examination Facility) in KAERI has the high-radioactive shielding facility and some R and D such that the spent PWR fuel can be burned again in a PHWR by direct re-fabrication into CANDU-compatible DUPIC fuel bundles, is being carried out using the manipulator attached to the hotcell-M6. Although many testing equipment are located and are being operated in hotcell, it is not possible to work personally inside the hotcell due to the high radioactive contaminant. When they are out of order, the cleaned one can be maintained and repaired using the renovated isolation room located over the hotcell-M6 and the new devised glove box located at service area. Some lead-sheets and the lead glasses were fixed on the wall of the isolation room to improve the shielding capability and the roof door of hotcell-M6 can be open remotely. To maintain and repair the equipment of hotcell, a working desk was constructed in the isolation room. The glove box was also made to withdraw the disordered equipment of hotcell through the rear door

  17. Discovering Hidden Resources: Assistive Technology Recycling, Refurbishing, and Redistribution. RESNA Technical Assistance Project.

    Science.gov (United States)

    RESNA: Association for the Advancement of Rehabilitation Technology, Arlington, VA.

    This monograph discusses the benefits of recycling and reusing assistive technology for students with disabilities. It begins by discussing the benefits of recycled assistive technology for suppliers, students, and consumers, and then profiles programmatic models for assistive technology recycling programs. The advantages and disadvantages for…

  18. High-Rise Refurbishment: The Energy-Efficient Upgrade of Multi-Story Residences in the European Union

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Some 36 million European households are in high-rise residences, one in six of all households, and yet many of the buildings are in urgent need of refurbishment. This study, which is one in a series being conducted on behalf of the International Energy Agency addressing the energy performance of the existing IEA-wide building stock, identifies a Europe-wide cost-effective energy saving potential of 28% from energy-efficient refurbishment of the high-rise residential building stock. Attainment of this potential would imply a 1.5% reduction of Europe's total final energy demand and annual CO2 emissions savings of 35 Mt. In practice only the less efficient buildings need to be refurbished to realise these stockaverage savings and for these buildings typical savings in heating energy from refurbishment of between 70 and 80% are identified. Buildings in general suffer from a variety of barriers that tend to prevent their occupants from maintaining and refurbishing them to levels of comfort and energy performance that would be justified over the longer term, but collective housing in general is particularly susceptible to market failures. Many occupants do not own the property while their landlords usually have little motivation to finance improvements. Refurbishment requires collective agreement on a capital investment, which is difficult to establish especially when some occupants expect to live in the building over the longer-term but others only for the short-term. Furthermore, in most cases the occupants of high-rise residences are not among the wealthier members of society and they find it difficult to raise capital for longer-term investments. It is not surprising, then, to find that this section of the building stock is the most neglected and that there remain significant cost-effective opportunities for it to be refurbished in a way that improves comfort, saves energy, reduces CO2 emissions and significantly improves the urban environment.

  19. Refurbishment and replacement efforts to mitigate ageing at Tarapur Atomic Power Station - an overview

    International Nuclear Information System (INIS)

    Katiyar, S.C.; Thattey, V.; Das, P.K.

    2006-01-01

    Tarapur Atomic Power Station (TAPS) - a twin Boiling Water Reactor unit and India's first Atomic Power Station was commissioned in April 1969, and was declared commercial in November 1969. Since then the light water moderated, low enriched uranium BWR with its demonstrated reliability and favourable economics is playing a vital role as a reliable source of power for the states of Maharashtra and Gujarat. The Power Station played a key role as a technology demonstrator validating the nuclear energy as safe and environmentally benign and economically viable alternate source of power generation in India. Built in the late sixties with state-of-the-art safety features prevailing then, TAPS has further evolved to be a safe plant with renovation and refurbishment efforts. Ageing Management Programme is in place at TAPS. Identification of systems, structures and components (SSCs) important to safety and availability, assessment of ageing degradation of these SSCs and mitigation through repair, replacement and refurbishment based on the investigations have enhanced the plant safety and reliability. The station's operating experience and feedback from BWRs operating abroad have also given inputs to Ageing Management Programme. A good number of major equipment have been replaced to mitigate ageing. Primary system piping, process heat exchangers, feed water heaters, turbine extraction system piping, turbine blades, emergency condenser tube bundles, various pumps, station batteries, electrical cables, circuit breakers etc. are some of them. Obsolescence is another aspect of ageing of a plant. Replacement of obsolete equipment and components particularly in C and I is another area where much headway has been made. Replacement and refurbishment of equipment have been done after detailed study and analysis so that current standards are met. Retrofitting the indigenously developed and fabricated equipment in a compact plant like TAPS was a difficult task and required lot of

  20. Densifying the city: urban recycle as a strategic system to refurbish the built environment

    Directory of Open Access Journals (Sweden)

    Vittorino Belpoliti

    2015-11-01

    Full Text Available The persisting economic crisis and the necessity for more sustainable construction processes imply the need for innovative strategies to reuse the existing building stock. Retrofit and recycling plans are already active for whole city districts, adopting the urban densification strategy to reduce the consumption of resources, promoting the functional, technological, and energy refurbishment of the existing city districts The study introduces considerations and tools to increase the efficiency of retrofit action onto abandoned and degraded area through the improvement of their energy and environmental performances. 

  1. Motier church - refurbishment of heating system; Kirche Motier Sanierung der Raumheizung

    Energy Technology Data Exchange (ETDEWEB)

    Grizzetti, V.

    2003-07-01

    This final report for the Swiss Federal Office for Energy describes the refurbishment of the space heating system of the historical church in Motier, Switzerland. The 50-year old, inefficient electrical direct heating system of the church, which is a listed building, and the new, heat pump-based system are described. Heating energy is distributed via a warm-air system, geothermal energy provides the primary heat source for the heat pump. Technical details of the heating characteristics and energy consumption of the old and new heating systems are presented in the form of tables and diagrams. The maintenance of the heating system's ventilation unit is also discussed.

  2. Refurbishment of damaged tools using the combination of GTAW and laser beam welding

    Directory of Open Access Journals (Sweden)

    J. Tušek

    2014-10-01

    Full Text Available This paper presents the use of two welding processes for the refurbishment of damaged industrial tools. In the first part the problem is presented followed by the comparison of GTAW and laser welding in terms of repair welding of damaged tools. The macrosections of the welds show the difference between both welding processes in repairing of damaged tools. At the conclusion the main findings are presented. In many cases it is useful to use both welding processes in order to achieve better weld quality and to make welding more economical. The order of the technology used depends on the tool material, the use of the tool and the tool damage.

  3. Applying a CPLD for Refurbishment of a Multi-channel Pulse Height Analyzer

    International Nuclear Information System (INIS)

    Leetragunpichitchai, Supalerk; Thong-Aram, Decho; Ploykrachang, Kamontip

    2007-08-01

    Full text: This research applied a CPLD for construction of a 100 MHz, 2048 channel, Wilkinson type analog to digital converter (ADC) circuits for refurbishment of an original multi-channel pulse height analyzer (PHA) ADC. Introduction of the CPLD could reduce the complexity of the circuits, equipment size and also the power consumption while the operation speed was increased. The linearity test of the ADC was found to be excellent with an R2 = 0.9995 and a maximum pulse rate of 48.828 k cps could be converted in this system. Therefore the developed system was appropriate for replacing the original ADC

  4. Refurbishment of small hydropower plants in Romania; Sanierung von Kleinwasserkraftwerken in Rumaenien

    Energy Technology Data Exchange (ETDEWEB)

    Gmeinbauer, Joerg [Wien Energie GmbH, Wien (Austria)

    2010-07-01

    In 2008 Wien Energie subsidiary Wienstrom GmbH participated in three public auctions of Hidroelectrica S.A. for the sale of old small hydro power plants in Romania. Together with strategic partners Wienstrom could successfully compete against local and international competition and acquired 31 small hydro power plants with a total installed capacity of around 20 MW. The plants were integrated into the newly established Vienna Energy Forta Naturala Srl. and are being completely refurbished at the moment. Wien Energie consequently is already the third largest operator of small hydro power plants in Romania. (orig.)

  5. The effectiveness of environment assessment tools to guide refurbishment of Australian residential aged care facilities: A systematic review.

    Science.gov (United States)

    Neylon, Samantha; Bulsara, Caroline; Hill, Anne-Marie

    2017-06-01

    To determine applicability of environment assessment tools in guiding minor refurbishments of Australian residential aged care facilities. Studies conducted in residential aged care settings using assessment tools which address the physical environment were eligible for inclusion in a systematic review. Given these studies are limited, tools which have not yet been utilised in research settings were also included. Tools were analysed using a critical appraisal screen. Forty-three publications met the inclusion criteria. Ten environment assessment tools were identified, of which four addressed all seven minor refurbishment domains of lighting, colour and contrast, sound, flooring, furniture, signage and way finding. Only one had undergone reliability and validity testing. There are four tools which may be suitable to use for minor refurbishment of Australian residential aged care facilities. Data on their reliability, validity and quality are limited. © 2017 AJA Inc.

  6. Recent advances in the utilization and the irradiation technology of the refurbished BR2 reactor

    International Nuclear Information System (INIS)

    Dekeyser, J.; Benoit, P.; Decloedt, C.; Pouleur, Y.; Verwimp, A.; Weber, M.; Vankeerberghen, M.; Ponsard, B.

    1999-01-01

    Operation and utilization of the materials testing reactor BR2 at the Belgian Nuclear Research Centre (SCK·CEN) has since its start in 1963 always followed closely the needs and developments of nuclear technology. In particular, a multitude of irradiation experiments have been carried out for most types of nuclear power reactors, existing or under design. Since the early 1990s and increased focus was directed towards more specific irradiation testing needs for light water reactor fuels and materials, although other areas of utilization continued as well (e.g. fusion reactor materials, safety research, ...), including also the growing activities of radioisotope production and silicon doping. An important milestone was the decision in 1994 to implement a comprehensive refurbishment programme for the BR2 reactor and plant installations. The scope of this programme comprised very substantial studies and hardware interventions, which have been completed in early 1997 within planning and budget. Directly connected to this strategic decision for reactor refurbishment was the reinforcement of our efforts to requalify and upgrade the existing irradiation facilities and to develop advanced devices in BR2 to support emerging programs in the following fields: - LWR pressure vessel steel, - LWR irradiation assisted stress corrosion cracking (IASCC), - reliability and safety of high-burnup LWR fuel, - fusion reactor materials and blanket components, - fast neutron reactor fuels and actinide burning, - extension and diversification of radioisotope production. The paper highlights these advances in the areas of BR2 utilisation and the ongoing development activities for the required new generation of irradiations devices. (author)

  7. Refurbishment of the rotating rack of the OSU TRIGA MKII reactor

    International Nuclear Information System (INIS)

    Higginbotham, J.F.; Dodd, B.; Pratt, D.S.; Anderson, T.V.

    1992-01-01

    Many TRIGA reactors have experienced operational difficulties with the rotating racks used for sample irradiation. Generally the rack gradually becomes more difficult to rotate until it finally seizes. The recommended action at that point is replacement of the entire facility at a significant cost. The purpose of this paper is to describe the symptoms leading to rack failure and to present the results of a refurbishment procedure that does not involve the use of solvents which create mixed chemical and radioactive hazardous waste. The primary reason for rack failure is the buildup of sludge produced through irradiation of lubrication oil. The refurbishment procedure involves using a commercially available degreasing solution which can be pumped into and out of the rack with the objective of removing this sludge. The solution used is sold under the trade name 'Simple Green'. No radioactive material was detected on smear or air samples taken of the work area during the reifurbishment activities and the rack rotates freely in both direction even after eighteen months of operation. The only disadvantage to performing this procedure has been the need to maintain a very aggressive contamination control program when unloading samples from the rack. A very fine particulate material attaches to the outside of tubes used to encapsulate samples. This material can produce contamination levels of 10,000 dpm/100 cm 2 in the worst cases but will typically produce local hot spots on the order of 1000 dpm. (author)

  8. The Prevelence of SBS and Absenteeism among Children in Urban Refurbished Private Preshools

    Directory of Open Access Journals (Sweden)

    Salleh Naziah Muhamad

    2016-01-01

    Full Text Available The preschool education is compulsory to children in Malaysia. This regulation has encouraged more premises to be refurbished as a pre-school building. This paper examines the pupils’ absenteeism and the prevalence of Sick Building Symptoms (SBS initiated in congested private preschool with different ventilation strategies. The study analysed data from the attendance record of 10 classrooms and the questionnaire surveys administered to 151 parents about their children health symptoms once they were leaving the schools building. Questions on SBS used 5-point likert scale with symptoms concern on nose, eye, head, throat, skin, breath and tiredness. The descriptive and chi-square test applied to obtain the association of SBS and ventilation strategies in the classrooms. With quantitative and qualitative explanation, the unhealthy environment in refurbished pre-schools explained. Running nose, coughing and sore throat frequently reported in air-conditioning (AC classrooms. The higher absent rate found in AC classrooms. These symptoms show there were weaknesses in ventilation performance and environment in the selected preschools. Further analyses on objective measurements in future research are strongly recommended.

  9. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production-Case studies

    International Nuclear Information System (INIS)

    Grammelis, P.; Koukouzas, N.; Skodras, G.; Kakaras, E.; Tumanovsky, A.; Kotler, V.

    2006-01-01

    The paper aims to present the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NO x abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new Circulating Fluidized Bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station

  10. Refurbishment priorities at the Russian coal-fired power sector for cleaner energy production-Case studies

    Energy Technology Data Exchange (ETDEWEB)

    Grammelis, P. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece) and Laboratory of Steam Boilers and Thermal Plants, Mechanical Engineering Department, National Technical University of Athens, Athens (Greece)]. E-mail: pgra@central.ntua.gr; Koukouzas, N. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Skodras, G. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Kakaras, E. [Centre for Research and Technology Hellas/Institute of Solid Fuels Technology and Applications (CERTH/ISFTA), 4 km N.R. Ptolemaida-Kozani, P.O. Box 95, Ptolemaida 50200 (Greece); Laboratory of Steam Boilers and Thermal Plants, Mechanical Engineering Department, National Technical University of Athens, Athens (Greece); Tumanovsky, A. [VTI All Russia Thermal Engineering Institute (Russian Federation); Kotler, V. [VTI All Russia Thermal Engineering Institute (Russian Federation)

    2006-11-15

    The paper aims to present the current status of the coal-fired power sector in Russia, the prospects for renovation activities based on Clean Coal Technologies (CCT) and two case studies on potential refurbishment projects. Data were collected for 180 thermoelectric units with capacity higher than 100 MWe and the renovation needs of the power sector, among the retrofitting, repowering and reconstruction options, were estimated through a multi-criteria analysis. The most attractive system to renovate a power plant between the Supercritical Combustion (SC) and the Fluidized Bed Combustion (FBC) technologies was evaluated. The application of each of the aforementioned technologies at the Kashirskaya and Shaturskaya power plants was studied and their replication potential in the Russian coal-fired power plant park was examined. Nowadays, the installed capacity of coal-fired power plants in the Russian Federation is 29.3 GWe, while they account for about 19% of the total electricity generation in the area. The low efficiency and especially the advanced age are the determinant factors for renovation applications at the Russian units. Even in the more conservative modernization scenario, over 30% of the thermoelectric units have to be repowered or reconstructed. Concrete proposals about the profitable and reliable operation of two Russian thermoelectric units with minimized environmental effects were elaborated. A new unit of 315 MWe with supercritical steam parameters and reburning for NO {sub x} abatement is envisaged to upgrade Unit 1 of Kashirskaya power station, while new Circulating Fluidized Bed (CFB) boilers of the same steam generation is the most promising renovation option for the boilers of Unit 1 in Shaturskaya power station.

  11. Refurbishment and modification of existing protective shipping packages (for 30-inch UF{sub 6} cylinders) per USDOT specification No. USA-DOT-21PF-1A

    Energy Technology Data Exchange (ETDEWEB)

    Housholder, W.R. [Nuclear Containers, Incorporated, Elizabethton, TN (United States)

    1991-12-31

    This paper addresses the refurbishment procedures for existing shipping containers for 30-inch diameter UF{sub 6} cylinders in accordance with DOT Specification 21PF-1 and the criteria used to determine rejection when such packages are unsuitable for refurbishment.

  12. An integrated design process for a zero-energy refurbishment prototype for post-war residential buildings in the Netherlands

    NARCIS (Netherlands)

    Konstantinou, T.; Klein, T.; Guerra Santin, O.; Boess, S.U.; Silvester, S.

    2015-01-01

    Although refurbishment is a necessary step to reach the ambitious energy and decarbonisation targets for 2020 and 2050, which require an eventual reduction up to 90% in CO2 emissions, the rate of renovation is still relatively low. There is an increasing demand to upgrade both the physical condition

  13. Refurbishment of the gas system, Task 3.08/04-07; Podzadatak 3.08/04-07 Remont sistema gasa

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Bratic, A [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor gas system in the RA reactor building was inspected and tested, the components were cleaned and decontaminated. This report describes detailed instructions and actions concerning repair and decontamination of the gas system components.

  14. Current status of operation, utilization and refurbishment of the Dalat nuclear research reactor

    International Nuclear Information System (INIS)

    Pham Duy Hien.

    1993-01-01

    The reconstructed nuclear research reactor at Dalat, Vietnam has been put into operation since March 1984. Up to present a cumulative operation time of 13,172 hrs at nominal power (500 kW) has been recorded. Production of radioisotopes for medical uses, element analysis by using activation techniques, as well as fundamental and applied research with filtered neutrons are the main activities of reactor utilizations. The problems facing Dalat Nuclear Research Institute are the ageing of the re-used TRIGA-MARK-II reactor components (especially the corrosion of the reactor tank), as well as the obsolescence of many equipment and components of the reactor control and instrumentation system. Refurbishment works are being in process with the technical and financial supports from the Vietnam government and the IAEA. (author). 7 refs, 2 tabs, 10 figs

  15. Case study of a not-so-ordinary building - the Cowra Shire administration building ESD refurbishment

    Energy Technology Data Exchange (ETDEWEB)

    Halperin, M.; Arch, B. [Mahalath Halperin Architects Pty Ltd., Armidale (Australia). RAIA Country Division

    2004-07-01

    In refurbishing the Cowra Administration Building, Mahalath Halperin Architects transformed a concrete and glass building of the 1960s into an energy efficient and environmentally responsible building, yet looks to all intents and purposes like an 'ordinary building'. To some, it is simply a newer, nicer building with bright colours, open spaces and a pleasant work environment. But whilst not necessarily being outwardly different in issues of being a 'green building', the resultant building shows that there are many small yet easily achievable ways to be green. That it is not hard, and is in fact beneficial, to reduce energy consumption and overheads, take advantage of the sun (despite its poor orientation) and take on environmental responsibility. (orig.)

  16. Refurbishment implications on long-term waste management strategies at Point Lepreau

    International Nuclear Information System (INIS)

    Hickman, C.

    2011-01-01

    This paper discusses Point Lepreau Generating Station's waste management experiences during the Refurbishment outage. In short, Point Lepreau GS has been challenged during the outage due to the amount of low and intermediate level waste that has been generated compared to that which was expected, which has driven the need to develop a new waste management strategy in the middle of the outage. The paper presents an overview of pre-outage waste handling, what process changes and schedule changes occurred during the outage, and provides a discussion of the operational and financial consequences of those changes. Key issues highlighted by the paper include the need for adequate provision of waste management facilities during large outages, the importance of ensuring that contractors have a stake in waste minimization activities, and long term waste management implications that need to be considered for large outages.

  17. Start-up of Cirus after refurbishment outage and observations during approach to criticality

    International Nuclear Information System (INIS)

    Singh, Tej; Singh, Kanchhi; Sengupta, S.N.

    2004-10-01

    The report presents various physics related aspects of the startup of Cirus reactor after the prolonged refurbishment outage. The special nuclear instrumentation scheme adopted to ensure safe startup of the reactor is described. Salient observations made and physics measurements carried out during various approaches to criticality are covered. One of the significant observations concerned a major reactivity anomaly during the approach to criticality. After due investigations the cause of the anomaly was attributed to the inadvertent wetting of the graphite reflector which houses the reactor regulating and protection system ion chambers. The report also includes salient observations during raising of reactor power to high levels. The wet reflector also resulted in a significant difference measured between the thermal and neutronic power of the reactor. In view of the reactivity anomaly, the core reactivity variation with time was closely followed and compared with computations. As expected the reactivity anomaly reduced gradually with time. (author)

  18. Main refurbishment activities on electronic and electrical equipment for the FRG-1 research reactor

    International Nuclear Information System (INIS)

    Blom, K.H.; Krull, W.

    1997-01-01

    As GKSS intends to operate the research reactor FRG-1 safely and reliably for many years to come, the plant is constantly refurbished and upgraded both in the interests of safety and operational reasons. The following electronic and electrical systems have been replaced or improved since 1990: Information and signalling systems; Emergency power plant (permit applied for); External and internal lightning protection system; Reactor protection system (in part); Safety lighting; Alarm and staff locating system; Control room telephone system; Closed-circuit television system; Beam tube controls; Storage plant for radioactive liquid waste; Ambient dose rate measuring system; Meteorological measuring system; Control and measuring system for the primary cooling circuit; Control rod drives; Control rod control system; Soft start for the secondary pumps; Control and switching devices for the emergency power plant; Trailing cable installation for the reactor bridge; Main-voltage distribution systems/cable routes. (author). 13 figs, 1 tab

  19. Status of FRJ-2 refurbishment of tank pipes and essential results of aging analysis

    International Nuclear Information System (INIS)

    Hansen, G.; Thamm, G.; Thome, M.

    1993-01-01

    An aging evaluation program for FRJ-2 (DIDO) of the Forschungszentrum Juelich GmbH has been developed and is currently executed in cooperation with the licensing and regulatory and TUV experts in order to determine the overall life expectancy of the facility and to identify critical systems and components that need to be upgraded or refurbished for future safe reactor operation. In Phase A (completed) a so called master list of the FRJ-2 mechanical, electrical and structural components was compiled on a system-by system basis and the operational documentation with respect to regular inspections, maintenance, repair and unusual occurences was carefully examined. Critical components were selected and their ageing respectively life limiting mechanisms identified. In Phase (currently under way) special inspections, examinations and tests for critical systems/components are being elaborated, executed and evaluated. Current work is being concentrated on non replaceable components (e.g. reactor aluminium tank (RAT) and the connecting pipes to the primary cooling circuit, the reactor steel tank and pipe work inside the concrete reactor block). As a consequence of first results of the aging evaluation program and due to leaks in the weir and drain pipes of the RAT a repair/refurbishment program was set up for the Al-RAT pipes (risers, downcomers weir and drain pipes) and the steel guide tubes. Details of the r/r program which is in far progress and first essential results of the aging evaluation will be presented. The results achieved until today are encouraging with respect to safe reactor operation on short and medium term. (author)

  20. Status of FRJ-2 Refurbishment of tank pipes and essential results of aging analysis

    International Nuclear Information System (INIS)

    Hansen, G.; Thamm, G.; Thome, M.

    1994-01-01

    An aging evaluation program for FRJ-2 (DIDO) of the Forschungszentrum Juelich GmbH has been developed and is currently executed in cooperation with the licensing and regulatory and TUEV experts in order to determine the overall life expectancy of the facility and to identify critical systems and components that need to be upgraded or refurbished for future safe reactor operation. In Phase A (completed) a so called master list of the FRJ-2 mechanical, electrical and structural components was compiled on a system-by system basis and the operational documentation with respect to regular inspections, maintenance, repair and unusual occurrences was carefully examined. Critical components were selected and their ageing respectively life limiting mechanisms identified. In Phase B (currently under way) special inspections, examinations and tests for critical systems/components are being elaborated, executed and evaluated. Current work is being concentrated on non replaceable components (e.g. reactor aluminium tank (RAT) and the connecting pipes to the primary cooling circuit, the reactor steel tank and pipe work inside the concrete reactor block). As a consequence of first results of the aging evaluation program and due to leaks in the weir and drain pipes of the RAT a repair/refurbishment program was set up for the Al-RAT pipes (risers, downcomers, weir and drain pipes) and the steel guide tubes. Details of the r/r program which is in far progress and first essential results of the aging evaluation will be presented. The results achieved until today are encouraging with respect to safe reactor operation on short and medium term. (J.P.N.)

  1. Choosing the Energy Sources Needed for Utilities in the Design and Refurbishment of Buildings

    Directory of Open Access Journals (Sweden)

    Pavel Atănăsoae

    2018-03-01

    Full Text Available This paper presents a method for choosing the energy sources that are needed for the following building utilities following building: lighting, domestic hot water, heating, ventilation, and air conditioning. The novelty of this paper consists of applying the concept of the energy hub and considering the cost of carbon dioxide emissions when selecting the available energy sources in the building’s location. The criterion for selecting the energy sources is the minimum overall cost of all forms of energy that are consumed in the building over its estimated lifetime. In order to estimate the overall costs, it is necessary to know the power that is installed and provided by the energy production technologies that are inside the building, as well as the capacity of energy that is required from outside energy sources. An office building that was proposed for refurbishment has been investigated as a case study. In the paper, we have analysed four scenarios. The results indicate that more favourable alternative solutions can be obtained compared to the traditional scenario (Scenario 4—heat and electricity by public utility networks. The overall costs are 46.17% (212,671 EUR lower in Scenario 1, 25.35% (116,770 EUR lower in Scenario 2, and 10.89% (50,150 EUR lower in Scenario 3. Additionally, the carbon dioxide emissions are 22.98% (49 tonnes CO2/year lower in Scenario 1 and 8.91% (19 tonnes CO2/year lower in Scenario 2. Thus, renewable energy sources can occupy a growing share of the total energy consumption of the building. The proposed algorithm can be used for both the refurbishment of existing buildings and the design of new buildings.

  2. A containment analysis for SBLOCA in the refurbished Wolsong-1 Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Tech-Mo; Park, Jong-Ho

    2011-01-01

    Highlights: → The CANDU safety analysis has been accomplished for the refurbished Wolsong-1 NPP. → GOTHIC and SMART-IST codes and new methodology are used for the containment analysis. → The parametric studies for Iodine Chemistry (IMOD-2) model are performed. → And, IMOD-2 model is very sensitive to paint thickness and dousing water pH. → The radioactive doses to the public in SBLOCA event are far below the acceptable limits. - Abstract: A small break leading to a loss of coolant accident (SBLOCA), being one of the topic accidents in the nuclear plant diagnosis in recent years, has been analysed and evaluated for the refurbished Wolsong-1 Nuclear Power Plant (NPP). The Industry Standard Toolset (IST) codes developed by CANDU (Canadian Deuterium Uranium reactor) Owners Group and updated models including design change parameters are applied newly to the event analyses. The GOTHIC code has been used for the containment thermal-hydraulic analysis of Wolsong-1. Also, the SMART-IST code fitted in the Iodine Chemistry (IMOD-2) model has been used to predict nuclide behavior within the containment considering various aspects. The IMOD-2 was incorporated into SMART-IST as a module dealing with chemical transformations and mass transfer of iodine species in containment. IMOD-2 model is very sensitive to paint and chemicals. The parametric studies for the IMOD-2 model are performed to decide the analysis value set. The iodine release amount increases as the paint thickness increases. But, the iodine release amount increases as the water pH (dousing and primary heat transport (PHT)) decreases. The developed containment analysis methodology and the results of SBLOCA without Emergency Coolant Injection (ECI) are presented herein. Under the most heat-up conditions, the radionuclide release from the failed fuel into the containment and subsequently to the environment is such that the radioactive doses to the public are below the acceptable limits.

  3. Refurbishment of PSI-Hotlaboratory to comply with requested safety standards after 40 years of operation

    International Nuclear Information System (INIS)

    Bart, G.; Hofer, R.; Wiezel, L.

    2001-01-01

    The PSI Hotlaboratory has started its operation in 1962. From the very beginning the hotcell wing served for handling and gross PIE analysis of reactor core internals and highly active material from accelerator target stations. In the radiochemistry wing micro structural and chemical analyses of small, highly active samples were subsequently performed with equipment installed in individual lead shielded cells. The radiochemistry wing also served for radiopharmaceutical nuclide dispatching and actinide ceramics preparation. Several constructions and building enlargements have been added since 1962 and similarly, the safety infrastructure was improved case wise. In the course of reevaluating the principal safety documentation for the Hotlaboratory, during 1994-95 it was realized that the building concept with its class A radioactive areas did not comply any more with modern safely standards, in particular with fire protection regulations and operator safety. In accident scenario analyses it was further demonstrated that radio nuclide release to the environment could cause intolerable health risks to the surrounding population. It was therefore decided to principally refurbish the building infrastructure particularly with respect to fire protection, media, and laboratory instrumentation and control. The chosen concept consists in adding a so called media installation corridor on top and along the radiochemistry wing from which the individual labs, on two floors are reached by vertical media access channels. Since the reconstruction outage time had to be minimized and there was not enough storage capacity to remove the whole Hotlaboratory equipment at once, a stepwise reconstruction was planned with separation of specified blocks of labs which are freed from samples (but still contain specially encapsulated, internally contaminated glove boxes and lead shielded cells) and which are accessed from the building outside, while the rest of the labs are still (or again) in

  4. Getting the best value from refurb projects.

    Science.gov (United States)

    Dimitrijevic, Branka

    2013-04-01

    Professor Branka Dimitrijevic, director of CIC Start Online, a project funded by the Scottish Government and European Regional Development Fund combining the resources of seven Scottish universities that aims to embed sustainable building design and refurbishment into practice, reports on a conference jointly staged in Glasgow recently by the organisation and Health Facilities Scotland that considered this topical issue in some depth.

  5. Summary of public participation : Environmental impact assessment : Proposal by the New Brunswick Power Commission to refurbish the Coleson Cove generating station

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-09-01

    A proposal was made by New Brunswick (NB) Power for the refurbishment of the Coleson Cove generating station, to the Public Utilities Board (PUB). It was determined by the PUB that a requirement existed for 1050 megawatt (MW) of power at Coleson Cove. This document presented a summary of public participation. Two meetings were held in support of the Environmental Impact Assessment (EIA). Several concerns were raised by various groups at both meetings. Some of the issues discussed included: (1) Orimulsion{sup R} fuel, reputed to be the dirtiest fuel in the world, (2) fuel supply, (3) project agenda, (4) project costs and others. It appeared that most of the participants in the public consultation process were against the proposal. It was felt that the emissions of sulphur dioxide and nitrous oxide should be considered in the greater context of reducing present and future emissions of greenhouse gases. The participants recommended that the New Brunswick government support a 400 MW combined cycle natural gas turbine unit instead of the proposal under review. Much opposition to the project concerned the potential degradation of the environment and the health of the citizens. Environmental representatives were concerned since the Solid Waste Management Area would be located in the vicinity of a proposed marine and wildlife sanctuary. Industry representatives were eager for the opportunities offered by the proposal. refs.

  6. Small hydro project in Wohlen, Bern - Preliminary study; Programm Kleinwasserkraftwerke. KWKW Hofenmuehle, Wohlen BE - Vorstudie

    Energy Technology Data Exchange (ETDEWEB)

    Fritschi, M.; Spescha, P.

    2008-11-15

    This report for the Swiss Federal Office of Energy (SFOE) presents the preliminary project study for the refurbishment of an existing small hydropower installation in Wohlen, Bern, Switzerland. The installation is in the Hofenmuehle, a listed mill complex dating from the first half of the nineteenth century. The headrace channel has already been refurbished by a community service group. The high level of financial effort and the idealism of the owner families are noted. The existing installations are described in detail. The refurbishment of the technical equipment and the associated work such as water-flow measurements are discussed. Cost estimates and environmental aspects are presented and discussed as are the financing of the refurbishment work and the cost-covering remuneration for the power produced. A possible increase in the power produced and the associated water-usage concession are discussed.

  7. Integrating Life Cycle Energy into the Design of Façade Refurbishment for a Post-War Residential Building in The Netherlands

    Directory of Open Access Journals (Sweden)

    Paressa Loussos

    2015-05-01

    Full Text Available The existing building stock has been in the focus of European Union policies for energy savings. Nevertheless, energy certification schemes refer mostly to operational energy and usually do not consider aspects related to the life cycle of the building. To look at the overall energy cost during the lifespan of a building, the energy used to produce and assemble the building materials also needs to be included. This paper develops a design methodology for existing residential buildings that aims at decreasing the life cycle energy use as much as possible. This approach was applied on a case study of an existing post-war residential building in Utrecht, The Netherlands. The main focus of this study is to find a design solution for façade retrofitting that considers both embodied and operational energy. The design approach is based on comparing different strategies for the use of façade materials. This design methodology can be replicated in other projects, as the conclusions and recommendations can also be used for future refurbishment projects for which a low operational energy and materials with a low embodied energy are desired.

  8. Refurbishment of the transportation equipment, Task 3.08/04-10; Podzadatak 3.08/04-10 Remont transportnih uredjaja

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Bratic, A [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    Transportation equipment at the RA reactor includes the bridge crane in the reactor hall, another smaller crane, bridge crane in spent fuel storage space, crane for handling the fuel containers n the room 099 and cart of the transportation channel. Regular testing and maintenance during reactor operation was not considered sufficient, and for that reason the repair and maintenance actions were done during the refurbishment of the reactor while it has been shut-down.

  9. Austro-Hungarian Public Building Refurbishment and Energy Efficiency Measures - A Case Study on a Public Building in Sarajevo

    Science.gov (United States)

    Salihbegović, Amira; Čaušević, Amir; Rustempašić, Nerman; Avdić, Dženis; Smajlović, Esad

    2017-10-01

    Among other pieces of architectural historical heritage in Sarajevo, and Bosnia-Herzegovina in general, the Austro-Hungarian architecture has preserved its original architectural, artistic and engineering characteristics. Both residential and public representative urban blocks, streets and squares are of distinguishable ambience in the architectural and urban image of the city and are testifying about our architectural past. A number of buildings is valorised and protected by law in terms of their architectural, artistic and historical value. In addition, these buildings have a distinct functional, ambiental, historical, and even aesthetical value. To make them last longer, refurbishment of these buildings is challenging and presents potential and multiple benefits for the city, and beyond. Refurbishing built environment through functional reorganizing, redesign and energy efficiency measures applications could result in prolonged longevity, architectural identity preservation and interior comfort improvement. Besides, implemented measures for energy efficiency, through the refurbishment process, should optimize the needs for energy consumption in treated buildings. This paper defines options in comfort improvements and redesign, without implying risks to the building longevity, analyses interventions and energy efficiency measures which would enable potential energy saving assessment in the refurbishment process of masonry buildings. This paper also discusses the different techniques that can be adopted for conservation and preservation of historical masonry buildings from the Austro-Hungarian period dealing with energy efficiency. The works were preceded by historical research and on-site investigations. This paper describes a methodology to quantify their vulnerability. A scheme of structural retrofitting is suggested following the research conducted. Revitalization of the building consisted in the reconstruction of the old building structure, creating the inner

  10. Corrosion inhibition measures in primary cooling water system during refurbishment of Cirus, re-commissioning and subsequent operation

    International Nuclear Information System (INIS)

    Rai, K.K.; Ramesh, N.; Sharma, R.C.

    2008-01-01

    Cirus is a 40 MWth, heavy water moderated, demineralized light water cooled, natural uranium fuelled research reactor. Reactor was commissioned in year 1960 and operated satisfactorily till 1990. After that availability factor started decreasing mainly due to equipment outage exhibiting signs of ageing. Based upon systematic ageing studies and assessment of condition of systems, structures and components, a refurbishment plan including safety upgrades was drawn up. Reactor was shut down in October 1997 for execution of jobs. After completion of refurbishment jobs reactor was started back in October 2002 and power operation was achieved in 2003. Primary cooling water (PCW) system consists of re-circulating pumps, heat exchangers, expansion tank, piping, valves, emergency storage reservoir (Ball Tank) and other components. Normally the fission heat from fuel is removed by re-circulating coolant in closed loop and transferred to seawater via heat exchangers. In case of outage of pumps, shut down cooling is provided by flow of water from Ball Tank under gravity to the underground dump tanks. The dissolved oxygen is maintained below 2 ppm and pH is maintained neutral to minimize corrosion of fuel cladding (Aluminum). This paper highlights the experience gained during segmentation of primary cooling water pipelines for pressure testing, measures taken to corrosion inhibition of primary cooling water lines to permit execution of refurbishment jobs, inspections and actions taken to repair/replace the corroded PCW pipe line segments, observations regarding corrosion related failures, re-commissioning of the system after refurbishment, assessment for safe reactor operation and experience during power operation. (author)

  11. Renewable-based low-temperature district heating for existing buildings in various stages of refurbishment

    DEFF Research Database (Denmark)

    Brand, Marek; Svendsen, Svend

    2013-01-01

    Denmark is aiming for a fossil-free heating sector for buildings by 2035. Judging by the national heating plan, this will be achieved mainly by a further spread of DH (district heating) based on the renewable heat sources. To make the most cost-effective use of these sources, the DH supply...... and, for 98% of the year, to below 60 °C. However for the temperatures below 60 °C a low-temperature DH substation is required for DHW (domestic hot water) heating. This research shows that renewable sources of heat can be integrated into the DH system without problems and contribute to the fossil...... temperature should be as low as possible. We used IDA–ICE software to simulate a typical Danish single-family house from the 1970s connected to DH at three different stages of envelope and space heating system refurbishment. We wanted to investigate how low the DH supply temperature can be without reducing...

  12. A containment analysis for SBLOCA without ECI in the refurbished Wolsong-1 Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Kim, T.M.; Moon, B.J.; Bae, C.J.; Lee, S.H.; Choi, C.J.; Lee, D.S. [NSSS, Korea Power Engineering Company, Inc., Daejeon (Korea, Republic of); Kim, S.M. [NETEC, Korea Hydro and Nuclear Power Company, Inc., Daejeon (Korea, Republic of)

    2010-07-01

    A small break leading to loss of coolant accident (SBLOCA), being one of the topic accidents in the nuclear plant diagnosis in recent years, has been analyzed and evaluated for the refurbished Wolsong-1 Nuclear Power Plant (NPP). The industry standard toolset (IST) codes developed by CANDU Owners Group and updated models including design change parameters are applied to the event analyses. GOTHIC code has been used for the containment analysis of Wolsong-1. Also, SMART-IST code fitted in the Iodine Chemistry (IMOD-2) model has been used to predict nuclide behavior within the containment considering various aspects. IMOD-2 was incorporated into SMART-IST as a module dealing the chemical transformations and mass transfer of iodine species in containment. IMOD-2 model is very sensitive to paint and chemicals. The parameter studies for IMOD-2 model are performed to decide the analysis value set. The developed methodology and the results of SBLOCA without ECI are presented herein. Under the most heat-up conditions, the radionuclide release from the failed fuel into the containment and subsequently to the environment is such that the radioactive doses to the public are below the acceptable limits. (author)

  13. The NNR requirements to address modification, modernization, refurbishment and ageing management

    International Nuclear Information System (INIS)

    Thugwane, Samuel

    2013-01-01

    The National Nuclear Regulator (NNR) is a national competent authority in South African which has been mandated under Act 47 of 1999 to provide for the protection of property people and environment. The NNR achieves its mandated by issuing Nuclear Authorisations in case of Nuclear Installations and Certificate of registration for the mining industry. Currently SAFARI-1 Research Reactor at Pelindaba site is the only Research Reactor that is licensed by NNR through a Process based licensing. SAFARI-1 is a 20 MW research reactor and has been in operation since 1965 and is approaching its full lifetime. Regular, periodic and systematic examination, inspection, maintenance and testing of all plant, systems, structures and components have been developed and implemented. Modification and refurbishment has been implemented over years since its construction. Ageing of structural components and obsolescence is now becoming a challenge; as a result, Ageing Management Programme has been developed to address these issues. In accordance with the NNR requirements any modification that the licensee plan to implement, must comply with NNR approved processes and procedures relating to control of such modification to the design of existing plant, facility or system design, including modifications that may be of a temporary nature

  14. Saving money on rig refurbishments through foreign trade zones or duty-drawback

    International Nuclear Information System (INIS)

    Ward, R.J. Jr.

    1997-01-01

    The recent boom in day rates for rigs capable of drilling in deep water and harsh environments has created a frenzy of rig refurbishment activity in shipyards located in US Gulf states. In most instances, the destination for the rigs upon completion is the US Outer Continental Shelf (USOCS) in the Gulf of Mexico. The problem faced by contractors/operators planning to use US shipyards is that this circumstance has caused difficulty in shielding rigs and their foreign-sourced components from US Customs duties. Under US Customs law, a bona fide exportation requires severance from US commerce and joining to the commerce of some foreign country or, in the case of a vessel supply, a qualifying international voyage. The USOCS does not qualify as an exportation, nor do movements to drilling sites located on it qualify as an international voyage. Described here are two possible solutions to this economic dilemma and an example of how the foreign trade zone solution was applied by Global marine in its plans for upgrading some of its semisubmersible drilling rigs for deepwater USOCS work

  15. In-Space Repair and Refurbishment of Thermal Protection System Structures for Reusable Launch Vehicles

    Science.gov (United States)

    Singh, M.

    2007-01-01

    Advanced repair and refurbishment technologies are critically needed for the thermal protection system of current space transportation systems as well as for future launch and crew return vehicles. There is a history of damage to these systems from impact during ground handling or ice during launch. In addition, there exists the potential for in-orbit damage from micrometeoroid and orbital debris impact as well as different factors (weather, launch acoustics, shearing, etc.) during launch and re-entry. The GRC developed GRABER (Glenn Refractory Adhesive for Bonding and Exterior Repair) material has shown multiuse capability for repair of small cracks and damage in reinforced carbon-carbon (RCC) material. The concept consists of preparing an adhesive paste of desired ceramic with appropriate additives and then applying the paste to the damaged/cracked area of the RCC composites with an adhesive delivery system. The adhesive paste cures at 100-120 C and transforms into a high temperature ceramic during reentry conditions. A number of plasma torch and ArcJet tests were carried out to evaluate the crack repair capability of GRABER materials for Reinforced Carbon-Carbon (RCC) composites. For the large area repair applications, Integrated Systems for Tile and Leading Edge Repair (InSTALER) have been developed and evaluated under various ArcJet testing conditions. In this presentation, performance of the repair materials as applied to RCC is discussed. Additionally, critical in-space repair needs and technical challenges are reviewed.

  16. Life extension studies and refurbishing of C and I systems of Cirus

    International Nuclear Information System (INIS)

    Awale, P.K.; Sumanth, P.; Roy, Kallol; Bharadwaj, G.

    2005-01-01

    Effects of ageing and component obsolescence of C and I systems of Cirus has been studied, by classifying the C and I systems as (a) those which may affect the operating life of the plant and cannot be repaired/replaced without core-unloading and dismantling the reactor structure. (Group-A), (b) those components which can be repaired/replaced but with considerable difficulty (Group-B) and (c) those which do not affect plant operations and can be easily repaired or replaced (Group-C). Life extension studies included performance assessment, reliability centred evaluation, parametric deviations from base-line characteristics and identification of specific ageing phenomenon and examination of internals. Based on these studies a comprehensive ageing mitigation programme was evolved, necessitating suitable modifications, instrumentation upgradation and component repair/replacement. A major modification job has been to provide an alternate failed fuel detection (FFD) system, since the success rate of the present system, had been decreasing over the years. Further, taking advantage of the available refurbishing outage, a number of instruments and accessories, pertaining to Group-C, were also replaced with state-of-the-art, components. Consideration is also given to requirements of special reactor start-up instrumentation for sensing the initial low neutron count in presence of a high gamma background, during the ensuing reactor start-up with fresh fuel. (author)

  17. In search of a holistic, sustainable and replicable model for complete energy refurbishment in historic buildings

    Directory of Open Access Journals (Sweden)

    Marija S. Todorović

    2012-12-01

    Full Text Available The reduction of greenhouse gas emissions in buildings offers one of the most promising opportunities for developed and developing countries to cooperate in achieving the realization of significant energy efficiency improvements. However, achieving sustainability is not an easy task unless there is synergy with/between energy efficiency improvement and renewable energy sources (RES - these are not at present in widespread dissemination and use. This paper recognizes the synergetic relationship between conservation and sustainability. At present, the role of heritage conservation in achieving sustainability has not yet been fully recognized, nor have heritage needs been well integrated into sustainability initiatives. Historic buildings are inherently sustainable. Preservation maximizes the use of existing materials and infrastructures, reduces waste, and preserves the historical character of older towns and cities. Sustainability begins with preservation. Taking into account the original climatic adaptations of historic buildings, today’s sustainable technology can supplement inherent sustainable features without compromising their unique historical character. Furthermore, a number of paper reviews and case studies with related methodologies outline the need to implement the latest current knowledge and technologies (BPS - Building Performance Simulation and CFD - Computational Fluid Dynamics for use in the refurbishment design process, as well as highlighting the crucial importance of sustainability, relevant benchmarking and rating system development.

  18. The NNR requirements to address modification, modernization, refurbishment and ageing management

    Energy Technology Data Exchange (ETDEWEB)

    Thugwane, Samuel [National Nuclear Regulator, Pretoria (South Africa)

    2013-07-01

    The National Nuclear Regulator (NNR) is a national competent authority in South African which has been mandated under Act 47 of 1999 to provide for the protection of property people and environment. The NNR achieves its mandated by issuing Nuclear Authorisations in case of Nuclear Installations and Certificate of registration for the mining industry. Currently SAFARI-1 Research Reactor at Pelindaba site is the only Research Reactor that is licensed by NNR through a Process based licensing. SAFARI-1 is a 20 MW research reactor and has been in operation since 1965 and is approaching its full lifetime. Regular, periodic and systematic examination, inspection, maintenance and testing of all plant, systems, structures and components have been developed and implemented. Modification and refurbishment has been implemented over years since its construction. Ageing of structural components and obsolescence is now becoming a challenge; as a result, Ageing Management Programme has been developed to address these issues. In accordance with the NNR requirements any modification that the licensee plan to implement, must comply with NNR approved processes and procedures relating to control of such modification to the design of existing plant, facility or system design, including modifications that may be of a temporary nature.

  19. Refurbishment of uranium hexafluoride cylinder storage yards C-745-K, L, M, N, and P and construction of a new uranium hexafluoride cylinder storage yard (C-745-T) at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    International Nuclear Information System (INIS)

    1996-07-01

    The Paducah Gaseous Diffusion Plant (PGDP) is a uranium enrichment facility owned by the US Department of Energy (DOE). A residual of the uranium enrichment process is depleted uranium hexafluoride (UF6). Depleted UF6, a solid at ambient temperature, is stored in 32,200 steel cylinders that hold a maximum of 14 tons each. Storage conditions are suboptimal and have resulted in accelerated corrosion of cylinders, increasing the potential for a release of hazardous substances. Consequently, the DOE is proposing refurbishment of certain existing yards and construction of a new storage yard. This environmental assessment (EA) evaluates the impacts of the proposed action and no action and considers alternate sites for the proposed new storage yard. The proposed action includes (1) renovating five existing cylinder yards; (2) constructing a new UF6 storage yard; handling and onsite transport of cylinders among existing yards to accommodate construction; and (4) after refurbishment and construction, restacking of cylinders to meet spacing and inspection requirements. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969. Therefore, DOE is issuing a Finding of No Significant Impact. Additionally, it is reported in this EA that the loss of less than one acre of wetlands at the proposed project site would not be a significant adverse impact

  20. Refurbishment of uranium hexafluoride cylinder storage yards C-745-K, L, M, N, and P and construction of a new uranium hexafluoride cylinder storage yard (C-745-T) at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    The Paducah Gaseous Diffusion Plant (PGDP) is a uranium enrichment facility owned by the US Department of Energy (DOE). A residual of the uranium enrichment process is depleted uranium hexafluoride (UF6). Depleted UF6, a solid at ambient temperature, is stored in 32,200 steel cylinders that hold a maximum of 14 tons each. Storage conditions are suboptimal and have resulted in accelerated corrosion of cylinders, increasing the potential for a release of hazardous substances. Consequently, the DOE is proposing refurbishment of certain existing yards and construction of a new storage yard. This environmental assessment (EA) evaluates the impacts of the proposed action and no action and considers alternate sites for the proposed new storage yard. The proposed action includes (1) renovating five existing cylinder yards; (2) constructing a new UF6 storage yard; handling and onsite transport of cylinders among existing yards to accommodate construction; and (4) after refurbishment and construction, restacking of cylinders to meet spacing and inspection requirements. Based on the results of the analysis reported in the EA, DOE has determined that the proposed action is not a major Federal action that would significantly affect the quality of the human environment within the context of the National Environmental Policy Act of 1969. Therefore, DOE is issuing a Finding of No Significant Impact. Additionally, it is reported in this EA that the loss of less than one acre of wetlands at the proposed project site would not be a significant adverse impact.

  1. Approaches for the integration of human factors into the upgrading and refurbishment of control rooms - Summary and conclusions - Principal Working Group 1 on Operating Experience and Human Factors

    International Nuclear Information System (INIS)

    2002-01-01

    A modern approach to control room design, be it for upgrading or complete refurbishment, requires the integration of many disciplines and approaches. The integration of human factors into such a process continues to present challenges. How such a process should be conceived, planned, and carried out is of considerable interest to designers, operators and regulators. Many NPPs around the world have been, or will be faced with decisions concerning modernization of their control rooms. Such changes can be driven by a range of issues including; the need to replace outdated control and instrumentation systems; increasing regulatory concern about human performance; or the need to provide a better process control environment for NPPs whose life cycles extend beyond that originally intended. Considering the importance of operator performance for safe and profitable operations, a process for ensuring that human factors issues are properly addressed could be central to the success or failure of such a project. Human factors is of particular importance when a combination of existing and new systems are to be used, resulting in a so-called 'hybrid' control room. The workshop addressed this topical area by providing a forum where a number of important areas could be discussed and experiences and lessons shared. Topics identified before hand as important and worthy of discussion included: - Exploration of how human factors issues can be identified. - Consideration of those processes and techniques necessary to ensure that appropriate requirements are specified, and that suitable data is gathered and analysed. - Identification and discussion of issues related to the above topics together with lessons from utilities, vendors and regulators which have faced, or are currently facing, these challenges. The meeting itself focused on the state of knowledge and current best practices within these areas and provided a forum for the open discussion of the human factors issues, as seen by

  2. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  3. Energy analysis and refurbishment proposals for public housing in the city of Bari, Italy

    International Nuclear Information System (INIS)

    Di Turi, Silvia; Stefanizzi, Pietro

    2015-01-01

    From the perspectives of the energy and the environment, building stock should be considered a useful resource in the struggle against greenhouse gas emissions and scarcity of energy resources. The aim of this work is to provide an example of the application of a methodology to evaluate the energy needs of the building stock of a city and to determine the possible strategies for energy planning. This paper aims to obtain an estimate, on an urban scale, of the energy needs and CO 2 emissions of the public residential buildings of Bari. This estimate is achieved by evaluating the critical issues of the built heritage, the most common architectural typologies and the heating systems in the territory of the city of Bari in southern Italy, as well as the possible strategies for upgrading energy efficiency, through the combined use of energy software and geo-referenced systems. Furthermore, several possible interventions are assumed to improve the energy performance of buildings in not only environmental terms but also economic terms through the instrument of cost–benefit analysis. The ultimate goal is to compare the different intervention strategies to determine which demonstrate greater cost effectiveness and feasibility for future energy planning. - Highlights: • An evaluation of the energy needs of existing buildings in a city in Southern Italy is provided. • Possible refurbishment strategies are evaluated. • An economic analysis is carried out to understand the feasibility of interventions. • An estimate on an urban scale of the energy-saving potential of public housing in Bari is provided

  4. Refurbishment of Pakistan research reactor (PARR-1) for stainless steel lining of the reactor pool

    International Nuclear Information System (INIS)

    Salahuddin, A.; Israr, M.; Hussain, M.

    2002-01-01

    Pakistan Research Reactor-1 (PARR-1) is a pool-type research reactor. Reactor aging has resulted in the increase of water seepage from the concrete walls of the reactor pool. To stop the seepage, it was decided to augment the existing pool walls with an inner lining of stainless steel. This could be achieved only if the pool walls could be accessed unhindered and without excessive radiation doses. For this purpose a partial decommissioning was done by removing all active core components including standard/control fuel elements, reflector elements, beam tubes, thermal shield, core support structure, grid plate and the pool's ceramic tiles, etc. An overall decommissioning program was devised which included procedures specific to each item. This led to the development of a fuel transport cask for transportation, and an interim fuel storage bay for temporary storage of fuel elements (until final disposal). The safety of workers and the environment was ensured by the use of specially designed remote handling tools, appropriate shielding and pre-planned exposure reduction procedures based on the ALARA principle. During the implementation of this program, liquid and solid wastes generated were legally disposed of. It is felt that the experience gained during the refurbishment of PARR-1 to install the stainless steel liner will prove useful and better planning and execution for the future decommissioning of PARR-1, in particular, and for other research reactors like PARR-2 (27 kW MNSR), in general. Furthermore, due to the worldwide activities on decommissioning, especially those communicated through the IAEA CRP on 'Decommissioning Techniques for Research Reactors', the importance of early planning has been well recognized. This has made possible the implementation of some early steps like better record keeping, rehiring of trained manpower, and creation of interim and final waste storage. (author)

  5. Refurbishment and retrofitting of SF6 gas storage tanks of the pelletron accelerator

    International Nuclear Information System (INIS)

    Reddy, G.R.; Datar, V.M.; Parulekar, Y.M.

    2015-01-01

    The BARC-TIFR Pelletron Accelerator Facility has completed more than twenty six years of successful round-the-clock operation, serving diverse users from institutions within and outside DAE. The main accelerating structure and associated subsystems are housed in the accelerator tank under SF 6 gas medium. During maintenance of the accelerator, the SF 6 gas present in the accelerator tank is transferred in the four storage tanks located on the terrace of the building open to outside environment. These four storage tanks (with ∼ 1/4th of the main tank volume each) are ∼ 4.27 m in diameter and ∼ 10 m in height each and are supported on RCC ring beams which are monolithically connected with the RCC structure below. Over the years, the anchor bolts and the base plates of support structure of storage tanks were found corroded and the foundation RCC ring beam indicated a few corrosion cracks. Health assessment of relevant structures and components were carried out. Considering the limitations of existing anchorage and also giving due considerations for reparability and replaceability, a new anchorage system was designed. The entire refurbishment and retrofitting works pertaining to the four SF 6 gas storage tanks was executed in a time bound manner to comply with the then PASC (Particle Accelerator Safety Committee) recommendations successfully, without disrupting the operations of the round-the-clock running Pelletron Accelerator facility. In addition, the thickness measurements for the storage tanks were performed. The relief valves and rupture disc assemblies across the storage tanks were replaced and reinstalled after introducing appropriate manual valves as suggested by the PASC. A new test set up was fabricated to perform pneumatic testing at the recommended pressure off-line for these relief valves and rupture disc assemblies prior to reinstallation. This paper describes the comprehensive rehabilitation and retrofitting procedures that were carried out at the

  6. Home-made refurbishment of the instrumentation and control system of the TRIGA reactor of the University of Pavia

    International Nuclear Information System (INIS)

    Borio di Tigliole, A.; Cagnazzo, M.; Magrotti, G.; Manera, S.; Salvini, A.; Musitelli, G.; Nardo, R.

    2008-01-01

    The Instrumentation and Control (I and C) System of the TRIGA reactor of the University of Pavia was dated and, in order to grant a safe and continuous reactor operation for the future, it became necessary to substitute or to upgrade the system. Since the substitution of the I and C system with a new-made one was very difficult to be performed due to long authorization procedures, an home-made refurbishment was planned. Using commercial components of high quality, almost a complete substitution, channel-by-channel, of the I and C system was realized without changing the operating and safety logics. The system includes: - the Reactor Linear Power Channel and Chart Recorder; - the Reactor Percent Power Safety Channel; - the High Voltage and Low Voltage Power Supply; - the Automatic Reactor Power Control; - the Fuel Elements and Cooling-Water Temperatures Measuring Channels; - the Water Conductivity Measuring Channel. The refurbished I and C system shows a very good operational behavior and reliability and will assure a continuous operation of the reactor for the future

  7. Factors relevant to the recycling or reuse of components arising from the decommissioning and refurbishment of nuclear facilities

    International Nuclear Information System (INIS)

    1988-01-01

    The decommissioning and decontamination of nuclear facilities is a topic of great interest to many Member States of the International Atomic Energy Agency (IAEA) because of the large number of older nuclear facilities which are or soon will be retired from service. To assist in the development of the required decommissioning expertise, the IAEA is developing reports and recommendations which will eventually form an integrated information base covering in a systematic way the wide range of topics associated with decommissioning. This information is required so that Member States can decommission their nuclear facilities in a safe, timely and cost effective manner and the IAEA can effectively respond to requests for assistance. One area which warrants more detailed analyses is an assessment of the factors important to the recycling or reuse of components arising from the refurbishment or decommissioning of nuclear plants, the topic of the present report. The document provides an up to date review of the engineering, social, scientific and administrative factors relevant to the safe recycling or reuse of components arising from decommissioning or refurbishment of nuclear facilities. This report should be of interest to owners, operators, policy makers and regulators involved with nuclear facilities, especially those in developing countries. Refs, figs and tabs

  8. Project management and institutional complexity in domestic housing refurbishment with innovative energy solutions : a case study analysis

    NARCIS (Netherlands)

    Hoppe, Thomas; Lulofs, Kristiaan R.D.

    2011-01-01

    Applying innovative energy solutions (IES) in dense residential areas in the Netherlands is a challenge. This paper presents a typology that supports the analysis and understanding of policy implementation processes to encourage the adoption of innovative energy solutions in urban residential areas.

  9. Refurbishing the reactor protection systems of VVER-440/230 and VVER-1000/320 nuclear power plants with exclusively digital IandC systems

    International Nuclear Information System (INIS)

    Martin, M.

    1997-01-01

    The refurbishment of reactor protection systems of nuclear power plants is based on two sets of requirements: engineering aspects such as performance, qualification and licensing, as well as interfaces to other systems; and cost-benefit relationships, ease of service and maintenance as well as installation during scheduled outages. A number of WWER-440 and WWER-1000 nuclear plants have announced their intention to refurbish their protection systems. Since 1994, these plants have been placing orders with Siemens for new protection systems, including the neutron flux monitoring system utilizing the advanced system TELEPERM XS. This exclusively digital IandC system provides an excellent foundation for the remaining plant service life

  10. Measurements of emissions during waste wood combustion to identify refurbishment needs; Maetning av emissioner vid foerbraenning av RT-flis foer att identifiera eventuella ombyggnadsaatgaerder

    Energy Technology Data Exchange (ETDEWEB)

    Lindau, Leif

    2003-01-01

    The background to this project is the new EU directive 2000/76/EG regarding incineration of waste. This directive may have an effect on emission limits for Swedish plants firing waste wood. It may lead to needs of refurbishment in e.g. the area of flue gas cleaning equipment. In order to produce a basis to evaluate the need for such upgrading, measurement of metals, HCI, SO{sub 2} , CO, TOC and dioxin have been carried out on three plants firing wood waste: a grate boiler (Handeloeverket P11), one circulating fluid bed boiler (Aaterbruket in Lomma), and a bubbling fluidised bed boiler (Johannes in Gaevle, firing 50% waste wood). The measurements have mainly been carried out after boiler, equivalent to upstream flue gas cleaning. The results are that the demands of the EU directive on most points can be managed with existing equipment if this consists of electrostatic precipitator or bag filter with good performance and flue gas condensor. Without flue gas condensor, there is a need for other measures for 1-10 and for grate boilers, SO{sub 2} as well. The requirements in the directive for TOC is weaker than the demand on CO, and correspondingly, the demand on CO is driving. The level of dioxin from the boiler (upstream filter) exceeds allowed emission, and is in the range of 0,1-2 ng TE/Nm{sup 3} tg, 6 % O{sub 2} . Existing equipment will meet the emission limit for the lower levels (0,1-0,3) , but not safely for the higher levels (1,5-2). Correspondingly, there may be a need for equipment upgrading, e.g. in the form of activated carbon injection upstream flue gas filter.

  11. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VII Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities.

  12. French experience on renewing I and C systems in NPPs. Feedback from assessing nuclear instrumentation system (RPN) refurbishment at French CP0-series plants

    International Nuclear Information System (INIS)

    Elsensohn, O.; Fradet, F.; Peron, J.C.; Soubies, B.

    2003-01-01

    In 1996, the utility operating France's nuclear power plants launched feasibility studies for the refurbishment of the nuclear instrumentation system (RPN classed category A) installed in its CPO-series (900 MWe) units. The system was ultimately upgraded with digital I and C system, using a SPINLINE 3 platform. This article describes feedback from an evaluation conducted on the refurbishment by the Institute of Radiological Protection and Nuclear Safety (IRSN), technical support arm of the Directorate General for Nuclear Safety and Radiological Protection (DGSNR). The study begins with a historical overview of the refurbishing operation, then discusses the IRSN assessment method and the lessons learned from this first major revamp of an I and C system in the French nuclear reactor series. Based on its previous experience in evaluating I and C systems for P4/P'4 (1300 MWe) and N4 (1450 MWe) plants and to account for the first-ever aspect of such an upgrade, IRSN partitioned its assessment into four phases. This approach enabled taking into account the impact of RPN refurbishment at every level - system, hardware and qualification, software, operation, onsite requalification, health physics, fire protection and human factors. All six units in the CPO series have now been equipped with the new digital RPN. (authors)

  13. Vacuuming and drying during refurbishment, Task 3.08/04-11; Podzadatak 3.08/04-11 Vakuumiranje i susenje u toku remonta

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Crnilovic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    The following tasks were completed during RA reactor refurbishment: vacuuming the gas system; vacuuming of the heavy water system for collecting the leftover heavy water; drying the heavy water system to remove the demineralized water; drying the distillation system; vacuuming the heavy water system before filling with heavy water; leak testing of the complete reactor system.

  14. Refurbishment of the regulating and control equipment, Task 3.08/04-05; Zadatak 3.08/04-05 Remont uredjaja za regulaciju i upravljanje

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Popovic, B [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    In addition to the planned refurbishment and maintenance of the RA reactor control and regulating systems, this report describes the maintenance of the reactor protection and safety systems. According to the instructions included in this report the components of these systems were tested to verify their reliability.

  15. A Closed-Loop Supply Chain under Retail Price and Quality Dependent Demand with Remanufacturing and Refurbishing

    Science.gov (United States)

    Christy, A. Y.; Fauzi, B. N.; Kurdi, N. A.; Jauhari, W. A.; Saputro, D. R. S.

    2017-06-01

    The demand of a product is linearly dependent on the retail price and quality of the product. We address a closed-loop supply chain where the manufacturer manufactures products according to the demand and sells them through a retailer in the market. A third party collects the used products from costumers and sends to the manufacturer to increase the quality. If the products can retrieve the original quality, thus the process is called remanufacturing. Not every products can retrieve the original quality, thus manufacturer refurbish this products with lower price. We construct four different scenarios - centralized and decentralized led by manufacturer, retailer, and third party. From the comparison of the result obtained in the numerical example, we conclude that the joint profit obtained under centralized, manufacturer-led, and retailer-led policies is higher than third party-led policy.

  16. A study of design features of civil works of nuclear installations facilitating their eventual refurbishing, renewal, dismantling or demolition

    International Nuclear Information System (INIS)

    Paton, A.A.; Benwell, P.; Irwin, T.F.; Hunter, I.

    1984-03-01

    This report describes a study that has been carried out to identify civil engineering features which could be incorporated in future gas cooled and light water cooled nuclear power plants to facilitate their decommissioning. The report reviews the problems likely to be met in decommissioning present day nuclear power plants and concludes that there is a number of such features which could be introduced in future designs to overcome or eliminate the problems. The report identifies and describes these features and recommends that further work be carried out to confirm their feasibility. The study briefly considered the possibility of refurbishing nuclear plants and concluded that this is not a realistic option in present circumstances. (author)

  17. The Architectural and Environmental Refurbishment of Industrialised Residential Construction. The example of the Selva Cafaro Quarter in Naples

    Directory of Open Access Journals (Sweden)

    Massimo Perriccioli

    2012-10-01

    Full Text Available This essay presents the experimental research conducted over the past years by the CHED (Concept House and Environmental Design Research Unit at the “Eduardo Vittoria” School of Architecture and Design in Ascoli Piceno, focused on the theme of Social Housing. The CHED is a temporary research team that proposes a union between diverse know-how, cultures, skills and specialisations, working towards a method of theoretical and conceptual investigation and design and building experiments in the field of innovative construction for sustainable dwelling. In particular, the experience outlined in this text relates to a design experiment completed between 2010 and 2011 and outside the borders of the Marche region, in agreement with the City of Naples' Assessorato all’Edilizia e al Centro Storico (Department of Building and the Historical Centre and focused on the architectural and environmental refurbishment of the residential quarter of Selva Cafaro in San Pietro a Patierno (Naples.

  18. DOE awards first economic conversion project at Rocky Flats

    International Nuclear Information System (INIS)

    Lobsenz, G.

    1993-01-01

    In the first economic conversion project at an Energy Department weapons facility, a Colorado company this week was given permission to refurbish four buildings at DOE's Rocky Flats plant to recycle slightly radioactive scrap metal. DOE, acting in conjunction with the Environmental Protection Agency and Colorado authorities, announced Tuesday it had given the go-ahead to Manufacturing Sciences Corp. of Golden, Colorado, to proceed with planning for the project

  19. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13; Podzadatak 3.08/04-13 Izvestaj o ucescu Odseka operativne dozimetrije RZ u remontnim radovima na Reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system.

  20. Optimizing the NPP refurbishment environmental qualification design process for an in-service installation

    International Nuclear Information System (INIS)

    MacBeth, M.J.; Hemmings, R.L.

    2002-01-01

    This paper describes the Environmental Qualification (EQ) modification design work required to upgrade the Reactor Building (RB) airlocks at the Pickering Nuclear Generating Station B Facility. The RB airlocks provide a containment boundary function and are designed to prevent a breach of containment from occurring for all analysed station conditions. Recent, more stringent, Canadian Nuclear Regulatory actions have imposed EQ requirements for the RB airlocks in Canadian Nuclear Generating Stations. The airlocks are required to function under the worst-case design basis accident (DBA) conditions for the assigned mission duration and the design must demonstrate that a spurious door opening cannot be initiated by any accident conditions. This paper reviews key project design activities while providing detailed insights to the potential solution or elimination of some problematic aspects of these types of design activities. General recommendations for optimal technical management of such project implementation issues are presented. (author)

  1. Development of a virtual training simulator for a challenging refurbishment task

    International Nuclear Information System (INIS)

    Mort, P.E.

    1996-01-01

    The development by British Nuclear Fuels plc BNFL of a training simulator for a plant modification task, the Raffinate Project, is described. The Project involves the remote removal of a section of a vertical process pipeline, welding a new pipe to the upper part and installing a new cap on the lower part. The equipment required to carry out this task comprises a number of work heads, a carriage mounted manipulator system and ancillary equipment including 22 closed-circuit television cameras. The technology put together to create the training simulator for this operation incorporates virtual reality and graphic simulation techniques researched by BNFL's Remote Handling and Robotics Programme over the past five years. (UK)

  2. Task 3.08/04-04, refurbishment of the dosimetry control equipment; Zadatak 3.08/04-04 Remont uredjaja dozimetrijske kontrole

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M; Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During three years of operation the designed RA dosimetry system showed satisfactory performance. During the period planned for maintenance and refurbishment of the RA reactor the functionality of the dosimetry system was tested and verified, the components were cleaned and calibrated. The system was operated for 24 hours for testing the reliability of components and whole system. This report describes detailed instructions and actions performed for these activities.

  3. Does demolition or refurbishment of old and inefficient homes help to increase our environmental, social and economic viability?

    International Nuclear Information System (INIS)

    Power, Anne

    2008-01-01

    The issue of whether to demolish or refurbish older housing has been debated for over a century. It has been an active policy area since the late 1880s, when the Government first authorised the statutory demolition of insanitary slums. In the 1960s, revulsion at the scale of 'demolition blight' and new building caused a rethink, leading to a major reinvestment in inner city neighbourhoods of older housing. In the past 5 years, debate on demolition and new building has been intensified by the Government's Sustainable Communities Plan of 2003, with its proposals for large-scale clearance and building. Environmental arguments about renovating the existing stock have gained increasing prominence as people have sought to defend their communities from demolition. The evidence on whether demolition would reduce the amount of greenhouse gases we emit into the atmosphere is unclear and disputed. This paper summarises the evidence and arguments, and attempts to clarify the most realistic, achievable route to major reductions in energy use in homes

  4. Optimal and Sustainable Plant Refurbishment in Historical Buildings: A Study of an Ancient Monastery Converted into a Showroom in Florence

    Directory of Open Access Journals (Sweden)

    Carla Balocco

    2013-04-01

    Full Text Available The aim of this research is to study the possibility and sustainability of retrofit and refurbishment design solutions on historical buildings converted to different uses and often clashing with their original purpose and architectural features. The building studied is an ancient monastery located in the historical center of Florence (Italy. Today the original cloister is covered over by a single glazed pitched roof and used as a fashion showroom. Our proposed solution concerns a reversible and sustainable plant design integrated with an active transparent building casing. The existing glazed pitched roof was reconsidered and re-designed as part of the existing heating, ventilation and air conditioning (HVAC plant system, based on the functioning of an active thermal buffer to control the high heat flow rates and external thermal loads due to solar radiation. Hourly whole building energy analysis was carried out to check the effectiveness and energy sustainability of our proposed solution. Results obtained showed, from the historical-architectural, energy and environmental points of view, its sustainability due to the building-plant system integration and interaction with its location, the external climatic conditions and defined expected uses, in particular with reference to indoor thermal comfort.

  5. Does demolition or refurbishment of old and inefficient homes help to increase our environmental, social and economic viability?

    Energy Technology Data Exchange (ETDEWEB)

    Power, Anne [London School of Economics, Houghton Street, London WC2A 2AE (United Kingdom); Sustainable Development Commission, Room 101, 55 Whitehall, c/o 3-8 Whitehall Place, London SW1A 2HH (United Kingdom)

    2008-12-15

    The issue of whether to demolish or refurbish older housing has been debated for over a century. It has been an active policy area since the late 1880s, when the Government first authorised the statutory demolition of insanitary slums. In the 1960s, revulsion at the scale of 'demolition blight' and new building caused a rethink, leading to a major reinvestment in inner city neighbourhoods of older housing. In the past 5 years, debate on demolition and new building has been intensified by the Government's Sustainable Communities Plan of 2003, with its proposals for large-scale clearance and building. Environmental arguments about renovating the existing stock have gained increasing prominence as people have sought to defend their communities from demolition. The evidence on whether demolition would reduce the amount of greenhouse gases we emit into the atmosphere is unclear and disputed. This paper summarises the evidence and arguments, and attempts to clarify the most realistic, achievable route to major reductions in energy use in homes. The arguments that apply to housing also apply to most other buildings and therefore to the overall built environment, which accounts for half of all carbon emissions. Three main sources of evidence have helped in the development of this paper, but there are many other studies we draw on in the discussion.

  6. Environmental qualification design for NPP refurbishment to comply with revised licensing requirements

    International Nuclear Information System (INIS)

    MacBeth, M. J.; Hemmings, R. L.

    2002-01-01

    Recent Canadian Nuclear Regulatory decisions have imposed Environmental Qualification (EQ) requirements for twenty-four Reactor Building (RB) airlocks at the four-unit Pickering Nuclear Generating Station-B (PNGS-B) facility. This paper describes the EQ modification design work completed by CANATOM-NPM for the problematic aspects for such projects. The airlocks allow RB access while providing a containment boundary and are designed to prevent a potential breach of containment for all analysed station conditions. Each PNGS-B unit has three large equipment airlocks and three smaller personnel airlocks. The airlocks must function under postulated worst-case design basis accident(DBA) conditions for assigned mission durations. The design must ensure that accident conditions cannot spuriously initiate an un-requested door opening. CANATOM-NPM reviewed site data to specify the necessary EQ modifications required to satisfy licensing requirements while providing a correct and complete as-found record of the existing airlock installation. The design team assessed the installed airlocks configuration against environmental qualification requirements to finalize the list of necessary modifications. A comprehensive, cross-discipline review of proposed design changes was completed to identify any further changes required to satisfy the final EQ licensing goal. The design team also conducted a design review of the EQ modification installation strategy to integrate the design deliverables with the installation team requirements while attempting to minimize necessary outage time for EQ modification installations. This project was completed on schedule and within the cost limitations required by the client with comprehensive, high quality final design packages. Overall improvements were realized for OPG system drawings and the electronic documentation of design data. The EQ modifications designed by CANATOM-NPM will ensure the continued operation of the PNGS-B NPP past December 31

  7. The effect of refurbishing a UK steel plant on PM10 metal composition and ability to induce inflammation

    Directory of Open Access Journals (Sweden)

    Maynard Robert L

    2005-05-01

    Full Text Available Abstract Background In the year 2000 Corus closed its steel plant operations in Redcar, NE of England temporarily for refurbishment of its blast furnace. This study investigates the impact of the closure on the chemical composition and biological activity of PM10 collected in the vicinity of the steel plant. Methods The metal content of PM10 samples collected before during and after the closure was measured by ICP-MS in order to ascertain whether there was any significant alteration in PM10 composition during the steel plant closure. Biological activity was assessed by instillation of 24 hr PM10 samples into male Wistar rats for 18 hr (n = 6. Inflammation was identified by the cellular and biochemical profile of the bronchoalveolar lavage fluid. Metal chelation of PM10 samples was conducted using Chelex beads prior to treatment of macrophage cell line, J774, in vitro and assessment of pro-inflammatory cytokine expression. Results The total metal content of PM10 collected before and during the closure period were similar, but on reopening of the steel plant there was a significant 3-fold increase (p 10 collected during the reopened period, as well as significant increases in albumin (p 10 from the pre-closure and closure periods did not induce any significant alterations in inflammation or lung damage. The soluble and insoluble extractable PM10 components washed from the reopened period both induced a significant increase in neutrophil cell number (p 10 from the re-opened period stimulated J774 macrophages to generate TNF-α protein and this was significantly prevented by chelating the metal content of the PM10 prior to addition to the cells. Conclusion PM10-induced inflammation in the rat lung was related to the concentration of metals in the PM10 samples tested, and activity was found in both the soluble and insoluble fractions of the particulate pollutant.

  8. Pickering NGS A reactor building 1 dome refurbishment long-term monitoring of coating

    International Nuclear Information System (INIS)

    Deans, J.J.; Chan, P.; Gomme, R.

    2006-01-01

    'Full text:' To reduce air leakage through the dome of Pickering NGS A Reactor Building 1, in August 1993 a portion of the exterior concrete surface was coated with a single component elastomeric polyurethane material. An internal positive pressure test of the building, conducted between November 5 and 7, 1993, found that the air leakage rates were significantly lower in this test than leakage rates which had been measured during a pressure test conducted in 1992. This reduction in leakage was attributed to the successful performance of the coating. The need for a high-performance, elastomeric surface coating was identified for reduction of air leakage levels through the dome of Reactor Building l of Ontario Power Generation's (formerly Ontario Hydro's) Pickering 'A' Nuclear Generating Station near Toronto. A number of candidate coatings were extensively tested to assess the performance characteristics and identify a material that could withstand the elements and perform effectively for around 20 years. Under normal operating conditions, a licensing limit of 2.7% of contained mass/hour is set for permissible containment leakage whilst the operational working target is less than 1%. The facility's engineers determined that any leakages were pressure-dependent, so in an effort to remain well within their working target, they sought a system that would bridge and seal any hairline cracks in the concrete dome and thereby prevent the passage of gas or vapour through the substrate. On the basis of scheduling and cost, they concluded that a high performance coating was most appropriate for the project, and hired Kinectrics (formerly Ontario Hydro Technologies (OHT)) to select, test, assess and arrange for the application to the RB 1 Dome. In all, nearly 70 separate manufacturers were approached by Kinectrics with a view to obtaining recommendations for treatment. The respective performance data of the respondents' products were compared with a set of specific design

  9. Project W-314 Polyurea Special Protective Coating (SPC) Test Report Chemical Compatibility and Physical Characteristics Testing

    International Nuclear Information System (INIS)

    MAUSER, R.W.

    2001-01-01

    This Engineering Test report outlines the results obtained from testing polyurea on its decon factor, tank waste compatibility, and adhesion strength when subjected to a high level of gamma radiation. This report is used in conjunction with RPP-7187 Project W-314 Pit Coatings Repair Requirements Analysis, to document the fact polyurea meets the project W-314 requirements contained in HNF-SD-W314-PDS-005 and is therefore an acceptable SPC for use in W-314 pit refurbishments

  10. Siphon-based turbine - Demonstration project: hydropower plant at a paper factory in Perlen, Switzerland; Demonstrationsprojekt Saugheber - Turbinen. Wasserturbinenanlage Papierfabrik Perlen (WTA-PF)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) describes the demonstration project that concerned the re-activation and refurbishing of a very low-head hydropower installation. The functional principles of the siphon-turbine used are explained and the potential for its use at many low-head sites examined. The authors are of the opinion that innovative technology and simple mechanical concepts could be used to reactivate out-of-use hydropower plant or be used to refurbish existing plant to provide increased efficiency and reliability. Various other points that are to be considered when planning the refurbishment of a hydropower plant such as retaining mechanical and hydraulic symmetry in the plant are listed and concepts for reducing operating costs are discussed. Figures on the three runner-regulated turbines installed in Perlen are quoted.

  11. Indoor PM2.5 exposure in London's domestic stock: Modelling current and future exposures following energy efficient refurbishment

    Science.gov (United States)

    Shrubsole, C.; Ridley, I.; Biddulph, P.; Milner, J.; Vardoulakis, S.; Ucci, M.; Wilkinson, P.; Chalabi, Z.; Davies, M.

    2012-12-01

    Simulations using CONTAM (a validated multi-zone indoor air quality (IAQ) model) are employed to predict indoor exposure to PM2.5 in London dwellings in both the present day housing stock and the same stock following energy efficient refurbishments to meet greenhouse gas emissions reduction targets for 2050. We modelled interventions that would contribute to the achievement of these targets by reducing the permeability of the dwellings to 3 m3 m-2 h-1 at 50 Pa, combined with the introduction of mechanical ventilation and heat recovery (MVHR) systems. It is assumed that the current mean outdoor PM2.5 concentration of 13 μg m-3 decreased to 9 μg m-3 by 2050 due to emission control policies. Our primary finding was that installation of (assumed perfectly functioning) MVHR systems with permeability reduction are associated with appreciable reductions in PM2.5 exposure in both smoking and non-smoking dwellings. Modelling of the future scenario for non-smoking dwellings show a reduction in annual average indoor exposure to PM2.5 of 18.8 μg m-3 (from 28.4 to 9.6 μg m-3) for a typical household member. Also of interest is that a larger reduction of 42.6 μg m-3 (from 60.5 to 17.9 μg m-3) was shown for members exposed primarily to cooking-related particle emissions in the kitchen (cooks). Reductions in envelope permeability without mechanical ventilation produced increases in indoor PM2.5 concentrations; 5.4 μg m-3 for typical household members and 9.8 μg m-3 for cooks. These estimates of changes in PM2.5 exposure are sensitive to assumptions about occupant behaviour, ventilation system usage and the distributions of input variables (±72% for non-smoking and ±107% in smoking residences). However, if realised, they would result in significant health benefits.

  12. Management of the building survey at the refurbishing of the Carvajal/Giron´s house in Plasencia = Gestión de la Dirección de Obra en la rehabilitación de la casa Carvajal/Girón de Plasencia

    Directory of Open Access Journals (Sweden)

    Fernando Israel Olmedo Zazo

    2017-12-01

    The more accurate is the project, the less changes appear in the work. It´s needed a full available original information for an accurate project. It is hardly possible in refurbishing works. There are hidden part of the building which cannot be analysed until they are not revealed, as a consequence it is not possible to define how to do on them. It is even harder in Heritage Historical building since a specific licence is required. In this article is shown how the building survey of the refurbishing of the Carvajal/Giron´s house in a 4* Hotel was done. Resumen Toda obra se aproxima a su proyecto, cuanto más preciso es éste. Para que un proyecto sea preciso es necesario disponer de todos los datos de partida, empresa que no siempre es posible en obras de rehabilitación. El estado real de los elementos ocultos es imposible de determinar hasta que se descubren, lo que imposibilita la definición completa a priori de la actuación que necesitan. En los edificios históricos catalogados, además de la habitual licencia de obras expedida por el municipio, se precisa de una de una autorización expresa emitida por el Departamento de Patrimonio de la Comunidad Autónoma. En el presente artículo se indica el proceso de gestión de la dirección de obra en los trabajos de rehabilitación del Palacio Carvajal/Girón en hotel de 4*.

  13. Pulsed klystrons with feedback controlled mod-anode modulators

    Energy Technology Data Exchange (ETDEWEB)

    Reass, William A [Los Alamos National Laboratory; Baca, David M [Los Alamos National Laboratory; Jerry, Davis L [Los Alamos National Laboratory; Rees, Daniel E [Los Alamos National Laboratory

    2009-01-01

    This paper describes a fast rise and fall, totem-pole mod-anode modulators for klystron application. Details of these systems as recently installed utilizing a beam switch tube ''on-deck'' and a planar triode ''off-deck'' in a grid-catch feedback regulated configuration will be provided. The grid-catch configuration regulates the klystron mod-anode voltage at a specified set-point during switching as well as providing a control mechanism that flat-top regulates the klystron beam current during the pulse. This flat-topped klystron beam current is maintained while the capacitor bank droops. In addition, we will review more modern on-deck designs using a high gain, high voltage planar triode as a regulating and switching element. These designs are being developed, tested, and implemented for the Los Alamos Neutron Science Center (LANSCE) accelerator refurbishment project, ''LANSCE-R''. An advantage of the planar triode is that the tube can be directly operated with solid state linear components and provides for a very compact design. The tubes are inexpensive compared to stacked semiconductor switching assemblies and also provide a linear control capability. Details of these designs are provided as well as operational and developmental results.

  14. Tidd PFBC demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    Marrocco, M. [American Electric Power, Columbus, OH (United States)

    1997-12-31

    The Tidd project was one of the first joint government-industry ventures to be approved by the US Department of Energy (DOE) in its Clean Coal Technology Program. In March 1987, DOE signed an agreement with the Ohio Power Company, a subsidiary of American Electric Power, to refurbish the then-idle Tidd plant on the banks of the Ohio River with advanced pressurized fluidized bed technology. Testing ended after 49 months of operation, 100 individual tests, and the generation of more than 500,000 megawatt-hours of electricity. The demonstration plant has met its objectives. The project showed that more than 95 percent of sulfur dioxide pollutants could be removed inside the advanced boiler using the advanced combustion technology, giving future power plants an attractive alternative to expensive, add-on scrubber technology. In addition to its sulfur removal effectiveness, the plant`s sustained periods of steady-state operation boosted its availability significantly above design projections, heightening confidence that pressurized fluidized bed technology will be a reliable, baseload technology for future power plants. The technology also controlled the release of nitrogen oxides to levels well below the allowable limits set by federal air quality standards. It also produced a dry waste product that is much easier to handle than wastes from conventional power plants and will likely have commercial value when produced by future power plants.

  15. RA Reactor operation and maintenance (I-IX), part VI, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VI Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor the gas reactor system including the ventilation system was inspected and tested, the components were cleaned. This report describes detailed instructions and actions concerning repair and decontamination of the gas and ventilation systems components.

  16. Severe accident analysis of a steam generator tube rupture accident using MAAP-CANDU to support level 2 PSA for the Point Lepreau Generating Station Refurbishment Project

    Energy Technology Data Exchange (ETDEWEB)

    Petoukhov, S.M.; Brown, M.J. [Canadian Nuclear Laboratories, Chalk River, ON (Canada)

    2015-07-01

    A Level 2 Probabilistic Safety Assessment was performed for the Point Lepreau Generating Station. The MAAP-CANDU code was used to simulate the progression of postulated severe core damage accidents and fission product releases. This paper discusses the results for the reference case of the Steam Generator Tube Rupture initiating event. The reference case, dictated by the Level 2 Probabilistic Safety Assessment, was extreme and assumed most safety-related plant systems were not available: all steam generator feedwater; the emergency water supply; the moderator, shield and shutdown cooling systems; and all stages of emergency core cooling. The reference case also did not credit any post Fukushima lessons or any emergency mitigating equipment. The reference simulation predicted severe core damage beginning at 3.7 h, containment failure at 6.4 h, moderator boil off by 8.2 h, and calandria vessel failure at 42 h. A total release of 5.3% of the initial inventory of radioactive isotopes of Cs, Rb and I was predicted by the end of the simulation (139 h). Almost all noble gas fission products were released to the environment, primarily after the containment failure. No hydrogen/carbon monoxide burning was predicted. (author)

  17. Near-Site Transportation Infrastructure Project

    International Nuclear Information System (INIS)

    Viebrock, J.M.; Mote, N.

    1992-02-01

    There are 122 commercial nuclear facilities from which spent nuclear fuel will be accepted by the Federal Waste Management System (FWMS). Since some facilities share common sites and some facilities are on adjacent sites, 76 sites were identified for the Near-Site Transportation Infrastructure (NSTI) project. The objective of the NSTI project was to identify the options available for transportation of spent-fuel casks from each of these commercial nuclear facility sites to the main transportation routes -- interstate highways, commercial rail lines and navigable waterways available for commercial use. The near-site transportation infrastructure from each site was assessed, based on observation of technical features identified during a survey of the routes and facilities plus data collected from referenced information sources. The potential for refurbishment of transportation facilities which are not currently operational was also assessed, as was the potential for establishing new transportation facilities

  18. FMEA Performed on the SPINLINE3 Operational System Software as part of the TIHANGE 1 NIS Refurbishment Safety Case

    International Nuclear Information System (INIS)

    Ristord, L.; Esmenjaud, C.

    2002-01-01

    This paper introduces the SPINLINE3 technology and TIHANGE 1 the NIS project. It then focuses on the specificity of FMEA performed on software. It points out the benefits of this analysis and also some of the limitations and possible developments. It also gives characteristics that, if present in the software, help the analysis and the defenses. It takes as an example the analysis performed on the Operational System Software of the Schneider Electric safety digital generic platform SPINLINE3. The New TIHANGE 1 Nuclear Instrumentation System successfully started operation on the beginning of Marsh 2001 after the plant outage, as planned at the beginning of the project. The choice of a software-based technology has raised the issue of the risk of CCF due to the same software being used in redundant independent units. Implementing functional diversity or equipment diversity has been considered but found either not practicable or of little value within this context. The safety characteristics of the SPINLINE3 solution and the stringent and proven safety software development process applied by the Nuclear department of the Schneider Electric company have made acceptable the principle of a design based on redundant identical processing units for this project. In addition, because of the possible consequences in case of the NIS not performing its protection function on demand, the licensing authority has required an FMEA oriented toward the SCCF risk as part of the safety case. This FMEA has been performed on : - the NIS architecture, - the SPINLINE3 Operational System Software, - the three Tihange 1 application software (i.e. source, intermediate and power range). The process used and the results have been elaborated by Schneider Electric and reviewed by the customer and the licensing authority all along the project development until final acceptance. Issues have been raised and answers and/or complementary analyses provided, some of them making direct references to the

  19. NRC Information No. 91-48: False certificates of conformance provided by Westinghouse Electric Supply Company for refurbished commercial-grade circuit breakers

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    In April 1988, WESCO of Albany, New York, supplied 250 MCCBs (molded-case circuit breakers) to Spectrum of Schenectady, New York. Spectrum dedicated these commercial-grade items on the basis of independent testing and the certificates of conformance (CoCs) it received from WESCO. During receipt inspection testing, Peach Bottom determined that the MCCBs were not new and had been refurbished. The NRC conducted an inspection and investigation of Spectrum and WESCO in 1988 and 1989. During these efforts, the NRC identified that the MCCBs provided to Peach Bottom were reconditioned and not new equipment as specified in the purchase order. Although the purchase order from Spectrum to WESCO specifically required new equipment and CoCs, WESCO purchased the MCCBs from a subvendor which dealt mainly in reconditioned equipment and provided these reconditioned MCCBs to Spectrum with falsified CoCs that certified that they were new equipment. In addition, the investigation identified that WESCO ordered Westinghouse labels from the subvendor in order to label the shipping boxes that lacked labels. Spectrum performed the dedication inspection and testing to demonstrate the adequacy of the MCCBs from WESCO. However, the validity of this testing depended on the MCCBs being new equipment. Spectrum's failure to verify the accuracy or the validity of the CoCs resulted in Spectrum accepting fraudulent CoCs and providing reconditioned (as opposed to new) MCCBs to Peach Bottom

  20. Description and evaluation of a serious game intervention to engage low secure service users with serious mental illness in the design and refurbishment of their environment.

    Science.gov (United States)

    Fitzgerald, M M; Kirk, G D; Bristow, C A

    2011-05-01

    Service user involvement in all levels of healthcare provision is the expectation of UK government policy. Involvement should not only include participation in the planning and delivery of health care but also the exercise of choice and opinions about that care. In practice, however, service user engagement is most often tokenistic, involving post hoc consultation over plans already committed to by services. This paper explores an Occupational Therapy-led initiative to use the Serious Game format to engage low secure service users with serious mental illness in the design, layout and refurbishment of their unit. Among other things how medication was to be dispensed on the new unit was explored by this game and led to significant replanning in response to service user involvement. The game format was found to be a useful tool in facilitating communication between professionals and a traditionally marginalized and powerless client group. It enabled service users to have a voice, it provided a format for that voice to be heard and made possible service-led change in the planning process. © 2010 Blackwell Publishing.

  1. Project specific quality assurance plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation

  2. Risk-informed ranking of engineering projects

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2011-01-01

    Refurbishment planning requires prudent investment decisions with respect to the various systems and components at the station. These decisions are influenced by many factors, including engineering, safety, regulatory, economic, and political constraints. From an engineering perspective, the concept of cost-benefit analysis is a common way to allocate capital among various projects. Naturally, the 'best' or optimal project should have the lowest cost and the highest benefit. In the context of risk-informed decision making (RIDM), a process that has been widely embraced by the global nuclear community, the costs and benefits must further be 'weighted' by probabilities to estimate the underlying risk associated with the various planning alternatives. The main purpose of this study is to illustrate how risk and reliability information can be integrated into the refurbishment planning process to facilitate more objective and transparent investment decisions. The methodology is based on the concept of generation risk assessment (GRA) which provides a systematic approach for balancing investment costs with the reduction in overall financial risk. In addition to reliability predictions, the model provides estimates for the level of risk reduction associated with each system/project and also the break-even point for investment. This information is vital for project ranking, and helps to address the key question of whether capital investment should be made in the most risk critical systems, or in systems that reduce the overall risk the most. The application of the proposed methodology requires only basic information regarding the current reliability of each engineering system, which should be readily available from plant records and routine condition assessments. Because the methodology can be readily implemented in a Microsoft Excel spreadsheet, all plausible (e.g., bounding) planning scenarios, with or without investment, can also be generated quickly and easily, while

  3. Refurbishment and open source software

    CSIR Research Space (South Africa)

    Mabuza, S

    2006-11-01

    Full Text Available  & Open Source Software Electronic Waste Management Conference 2006 Sibongile Mabuza 2 Presentation Outline  About Meraka Institute Open Source Centre  Background to OSS  Extending life span using OSS  Different choices for different situations  Examples of... = common grazing ground (Sesotho)  Shared space for creative productivity  Emphasise African nature of scope and needs 4 Meraka Open Source Centre  Open Source Centre is part of the Meraka  Institute.  Currently, there are two offices:  CSIR headquarters  Soweto  Set up to amplify the beneficial impact of...

  4. Closure of Microcosm for refurbishment

    CERN Multimedia

    2014-01-01

    Since 1994, the Microcosm exhibition has given the opportunity to visitors of all ages and backgrounds to have a first glimpse into the secrets of physics.   To ensure that Microcosm can continue fulfilling its educational aims at the same level of quality for many years to come, it is closing for renovation work on 8 December 2014 and is expected to reopen during Summer 2015. During the closure, the “Fun with Physics” workshop will not take place, but the Universe of Particles exhibition in the Globe and the Passport to the Big Bang circuit will remain accessible to the public, free of charge and with no need to book in advance.  Guided tours of CERN are also available (advance booking required via this page).

  5. Bruce A units 1 and 2 restart project

    International Nuclear Information System (INIS)

    Routledge, K.

    2006-01-01

    This presentation provides an overview of the Bruce A Units 1 and 2 Restart project from the vantage point of the Project Management Contractor (PMC). The presentation will highlight the unique structure of the project, which has been designed to maximize project efficiencies while minimizing the impact to the Bruce Power operational reactors. Efficiency improvements covered in the presentation includes: support services provided to the direct work contractors, radiation protection, worker protection, engineering, field execution, maintenance and facilities. The presentation focusses on the roles of the PMC in helping to ensure the successful outcome of this ambitious reactor refurbishment project. In addition, the Construction Island concept that has been implemented on the project will be presented, with some of the innovative thinking that has gone into its creation. The organization of the PMC and an overview of the project schedule is also presented. AMEC NCL is a privately held consultancy in the Canadian nuclear industry which provides experienced and flexible multi-disciplined resources to support full project management, engineering solutions and safety consultancy services throughout the life cycle of nuclear facilities in Canada, and for customers in related markets in North America and overseas. AMEC NCL is a wholly-owned subsidiary of AMEC plc

  6. The Monticello license renewal project

    International Nuclear Information System (INIS)

    Clauss, J.M.; Harrison, D.L.; Pickens, T.A.

    1993-01-01

    Today, 111 nuclear power plants provide over 20 percent of the electrical energy generated in the United States. The operating license of the oldest operating plant will expire in 2003, one-third of the existing operating licenses will expire by 2010 and the newest plant's operating license will expire in 2033. The National Energy Strategy (NES) prepared by the Department of Energy (DOE) assumes that 70 percent of the current operating plants will continue to operate beyond their current license expiration. Power from current operating plants can assist in ensuring an adequate, diverse, and environmentally acceptable energy supply for economic growth and improved U.S. competitiveness. In order to preserve this energy resource, three major tasks must be successfully completed: (1) establishment of regulations, technical standards, and procedures for the preparation and review of License Renewal Applications (LRAs); (2) development of technical criteria and bases for monitoring, refurbishing or replacing plant equipment; and (3) demonstration of the regulatory process by a plant obtaining a renewed license. Since 1986, the DOE has been working with the nuclear industry and the Nuclear Regulatory Commission (NRC) to establish and demonstrate the option to extend the life of a nuclear power plant by renewing the operating license. The Monticello Lead Plant demonstration project was initiated in September 1988, following the Pilot Plant studies. This paper is primarily focused on the status and insights gained from the Northern States Power Company (NSP) Monticello Lead Plant demonstration project. The following information is included: (1) Current Status - Monticello License Renewal Application; (2) Economic Analysis; (3) License Renewal Regulatory Uncertainty Issues; (4) Key Decisions; (5) Management Structure; (6) Technical and Licensing Perspective; (7) NRC Interactions; (8) Summary

  7. Technical realisation of the VISA-3 project, Parts I-II, Part I; Tehnicka realizacija projekta VISA-3, I-II deo, I Deo

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M; Smokovic, Z [Institute of Nuclear Sciences Boris Kidric, Odeljenje za reaktorsku eksperimentalnu tehniku, Vinca, Beograd (Serbia and Montenegro)

    1966-11-15

    This task is related to irradiation of reactor materials (steel, Al, MgO, Al{sub 2}O{sub 3}, ets.) at higher temperatures (200-500 deg C) in the fast neutron flux. These conditions would be more realistic to real reactor conditions than the conditions achieved within VISA-2 project. The experimental space will be the same as in VISA-2 project, i.e. refurbished reactor channels and within the fuel elements. The irradiation capsule will be leak tight with thermal isolation layer and supplied with electric heater to enable temperature variation.

  8. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  9. UBERA-6 project: Achievements of 4 working years

    International Nuclear Information System (INIS)

    Blaumann, H; Fernandez, C; Dell Occhio, L; D Ovidio, C; Fabro, J; Miceli, M; Novara O; Perez, A; Taboada, H

    2009-01-01

    On May 2005 the President of CNEA created the UBERA-6 project, belonging to the former Technology and Environmental Management, with the aim to convert to Low Enriched Uranium (LEU) the RA-6 reactor core, to swap with the US Department of Energy (US-DoE) equivalent inventories of High Enriched Uranium (HEU) for LEU, to export to USA the spent HEU core and to recover and downblend to LEU remnant HEU inventories contained in fuel and irradiation target scraps. By means of two contracts signed by CNEA and US-DoE, acquisition of consumables and graphite reflectors, the fabrication of LEU core replacement, conditioning, transport and exportation of spent HEU core and subsequent supply of fresh LEU for fuel and irradiation targets used in our research reactors were costed. During July, 2006 468 HEU based fresh plates were exported to USA. On June 30th, 2007 the RA-6 reactor temporarily stopped working and its personnel remover the HEU core to the auxiliary pool. On November 7th the former spent HEU based core was exported to USA. During May and July, 2008 the new RA-6 reactor LEU based core and control assemblies were provided. During March, 2009 the RA-6 reactor became critical. For recovering and blending down of remnant HEU inventories, the Triple Height Laboratory (LTA) was refurbished. A Supplemental Agreement to one of the original contract between CNEA and US-DoE will financially support the refurbishment of the Radiochemical Facility Laboratory (LFR) and so reprocess irradiated HEU retained in radioisotope production filters to downblend into LEU, as well as the separation of the pair Sr90-Y90 and of Cs137 inventories for further application in Nuclear Medicine. [es

  10. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  11. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  12. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  13. Fiscal 1999 report on basic research for promotion of joint implementation programs. Energy saving project for Jingling Petrochemical Corp. Nanjing Refinery; 1999 nendo Jingling sekiyu kako koji Nanjing seiyusho shoene project chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    A survey is conducted for the above named plant under an energy saving project expected to link to the clean development mechanism (CDM) of COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change). Studies are conducted about the refurbishment of the existing power recovering facilities in the wake of a plan for enhancing FCC (fluid catalytic cracker) processing capability and about power recovery from unused exhaust gas from the RFCC (residual fluid catalytic cracker) second catalyst regeneration tower. A modification plan was drafted and rough designs were prepared therefor, and it was found that power recovery from RFCC would be technologically and economically unfeasible because of the high temperature and extremely small quantity of the recoverable gas. It was then concluded that the plan be abandoned. Thanks to the refurbishment of the existing power recovering facilities to go out of service under the new operating conditions after FCC facility modification and to the installation of a new exhaust gas processor for air pollution prevention, there will be 10.6MW to be recovered for a reduction in fuel for in-house power generation. The consequential reduction in energy consumption will result in a CO2 reduction of 70,000 tons/year. Though China has not yet ratified the COP3 protocol, it is hoped that it will consider emission tradings and participate in the project when designated as a CDM country. (NEDO)

  14. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  15. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  16. Energy policy fundamentals research programme - Activities and projects in 2002

    International Nuclear Information System (INIS)

    Meier, R.; Previdoli, P.

    2003-01-01

    This annual report for the Swiss Federal Office of Energy reviews the activities and projects carried out within the Swiss Confederation's Energy Policy Fundamentals Research programme during 2002. The programme's main centres of activity are described, including projects involving the acquisition of data on indicators of selected cantonal energy saving measures, the possibility of reducing carbon dioxide emissions by influencing fuel prices, new construction instead of refurbishment of buildings, internalisation of risks involved with nuclear power and the marginal costs of intensified energy-efficiency measures. In the technology monitoring area, the results of studies concerning combined heat and power systems, heat pumps and fuel cells are reviewed. Further projects are described in the building and fuel supply areas and the influence of wind power on European peak power requirements is examined. Marketing aspects concerning the thermal use of solar energy and low energy consumption housing are discussed, as is the promotion of energy efficiency in housing and industry. Also local and regional efforts being made in the energy policy area are described. The report is rounded off with a list of the various projects mentioned in the report and appropriate contact information

  17. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  18. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  19. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  20. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  1. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  2. Total renewal of a small hydro project on the Engstligenalp - Licence and construction project; Bergbahnen Engstligenalp AG - Gesamterneuerung Kleinwasserkraftwerk. Konzessions- und Bauprojekt - Technischer Bericht mit Beilagen

    Energy Technology Data Exchange (ETDEWEB)

    Conrad, M.

    2009-05-15

    This report for the Swiss Federal Office of Energy (SFOE) deals with the total renewal of a small hydro scheme operated by the Engstligenalp aerial cableway in Switzerland. The cableway operator considers itself as part of the national effort to support sustainability. The refurbished hydropower installation will produce power for around 500 homes. The hydrology of the catchment area involved, quantities of water available and residual water conditions as well as the existing installations are described and discussed. Stipulations concerning landscape conservation are noted. The renewal project is discussed and details are given on the dam, water intake, pressure pipe and regulation. The new underground facilities for the horizontal-axis turbine, generator and electrical equipment are described. Finally environmental aspects, energy production and economic viability are discussed.

  3. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  4. An International Project on Indoor Air Quality Design and Control in Low Energy Residential Buildings

    DEFF Research Database (Denmark)

    Rode, Carsten; Abadie, Marc; Qin, Menghao

    2016-01-01

    focal points to limiting energy consumption for thermally conditioning the indoor environment will be to possibly reducing the ventilation rate, or making it in a new way demand controlled. However, this must be done such that it does not have adverse effects on indoor air quality (IAQ). Annex 68......In order to achieve nearly net zero energy use, both new and energy refurbished existing buildings will in the future need to be still more efficient and optimized. Since such buildings can be expected to be already well insulated, airtight, and have heat recovery systems installed, one of the next......, Indoor Air Quality Design and Control in Low Energy Residential Buildings, is a project under IEA’s Energy Conservation in Buildings and Communities Program (EBC), which will endeavor to investigate how future residential buildings are able to have very high energy performance whilst providing...

  5. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  6. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  7. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  8. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  9. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  10. Project Reptile!

    Science.gov (United States)

    Diffily, Deborah

    2001-01-01

    Integrating curriculum is important in helping children make connections within and among areas. Presents a class project for kindergarten children which came out of the students' interests and desire to build a reptile exhibit. (ASK)

  11. Project Soar.

    Science.gov (United States)

    Austin, Marion

    1982-01-01

    Project Soar, a Saturday enrichment program for gifted students (6-14 years old), allows students to work intensively in a single area of interest. Examples are cited of students' work in crewel embroidery, creative writing, and biochemistry. (CL)

  12. EUROFANCOLEN Project

    International Nuclear Information System (INIS)

    Bueren, J. A.

    2014-01-01

    The first follow-up report of European Project EUROFANCOLEN, the purpose of which is to develop a gene therapy clinical trial to resolve bone marrow failure in patients with a genetic disease known as Fanconi anemia (FA), was sent to the European Commission in September. The main objective of project EUROFANCOLEN is to develop a gene therapy trial for patients with Fanconi anemia Type A (FA-A), which affects 80% of the patients with FA in Spain. (Author)

  13. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  14. District heating demonstration project. Swiecie, Poland. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    In January 1997 the district heating company in Swiecie, Poland, was donated DKK 1.3 Mio. as a part of the environmental related energy sector programme by the Danish government for a demonstration project. The Danish consultancy company Carl Bro a/s was appointed to conduct the work. The project was finished in January 1999. The present final report outlines the activities of the demonstration project. The activities of the project were several. Carl Bro a/s elaborated tender documents and procured 79 heat meters for all the substrations in the city in order to prepare for the new energy law and a changed tariff system which was introduced in January 1999. Carl Bro a/s further supported ZEC Swiecie in the development of their new tariff system through information from Danish district heating companies. The demonstration project was designed in the first phase of the project. During the design period one engineer from Swiecie participated in a study tour to Denmark to learn about technical solutions to present problems in Poland. The training course focused on preparation of hot tap water. The site for the demonstation project was in the centre of Swiecie in a housing society located in Wojska Polskiego. The blocks 75 and 75A were selected for modernisation of the substations, and block no. 73 was appointed as a reference block in which only a heat meter was installed. Further, block 75A was equipped with thermostatic valves at all the radiators in the flats. The registered savings during the monitoring period were between 7% and 14%, and an increased comfort in the flats was observed. The housing society`s board of directors were so pleased with the project that by their initiative block no. 77 was refurbished in the same way as the blocks covered by the demonstration project. However, the activities were extended with individual heat meters and the introduction of a new tariff system for the block. The energy savings from this project were substantial, and today

  15. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  16. The Lo Aguirre research reactor refurbishment

    International Nuclear Information System (INIS)

    Torres-Oviedo, G.

    1990-01-01

    A description is given of the main work which had to be performed on the experimental reactor of the Lo Aguirre nuclear power plant (RECH-2), following which it recently came into operation. In particular, an outline is given of the main changes and improvements made with regard to reactor physics calculations, the systems and components in the facility, and repair of existing fuel elements. Special importance was attached to the definition, application and meeting of nuclear safety requirements and the implementation of a consistent quality assurance programme. Certain aspects of the work performed, by virtue of the scope and importance of the tasks involved, resulted in clear improvements to and modernization of the facility - for example, the construction of a new control room, the construction of a computerized radiation protection and surveillance control room, the reconstruction of the primary coolant circuit, the complete refitting of reactor instrumentation to incorporate a computerized data acquisition system, the redesign and construction of reactor water treatment plants, improvements in experimental devices and the design and construction of new experimental devices. The reactor, construction of which was resumed in 1986, attained criticality on 6 September 1989 using the HEU fuel available. We are now at the stage of characterizing the reactor by measuring process and nuclear parameters prior to commencing power operation

  17. MOV refurbishment program cuts costs, meets requirements

    International Nuclear Information System (INIS)

    Lengyel, G.J.

    1991-01-01

    This paper reports that a motor operated valve (MOV) rebuild program at Peach Bottom Atomic power station began in October, 1986 with what is known internally as Modification (MOD) 1915. The Engineering the Research Department developed this modification to address requirements in NRC Bulletin 85-03. The MOD consisted of As found/As left testing of MOVs in the HPCI (high pressure coolant injection) and RCIC (reactor core isolation cooling) systems; six minor motor operator enhancements to facilitate maintenance and testing, and to increase reliability, and installation of a data acquisition network to support differential pressure testing of a select number of valves in Unit 2. Twenty-four valves were involved. Modification plans incorporated the work into the outage that was scheduled for December, 1986 to February, 1987. The plans took into account other preventive and corrective MOV maintenance tasks to be performed by the Maintenance Department. In addition, modifications of control circuits to satisfy separation criteria for Appendix R had to be integrated into the schedule. To facilitate testing, adjustments to the standard test methods under the Permits and Blocking System were necessary. The normal method of testing a piece of equipment after maintenance was to clear or temporarily clear the permit (red tag) and have a plant operator operate the equipment for the test group. This method for setting up the testing an MOV was considered unacceptable because it could occupy a plant operator for an entire shaft or longer

  18. Projective mapping

    DEFF Research Database (Denmark)

    Dehlholm, Christian; Brockhoff, Per B.; Bredie, Wender Laurentius Petrus

    2012-01-01

    by the practical testing environment. As a result of the changes, a reasonable assumption would be to question the consequences caused by the variations in method procedures. Here, the aim is to highlight the proven or hypothetic consequences of variations of Projective Mapping. Presented variations will include...... instructions and influence heavily the product placements and the descriptive vocabulary (Dehlholm et.al., 2012b). The type of assessors performing the method influences results with an extra aspect in Projective Mapping compared to more analytical tests, as the given spontaneous perceptions are much dependent......Projective Mapping (Risvik et.al., 1994) and its Napping (Pagès, 2003) variations have become increasingly popular in the sensory field for rapid collection of spontaneous product perceptions. It has been applied in variations which sometimes are caused by the purpose of the analysis and sometimes...

  19. Isotopes Project

    International Nuclear Information System (INIS)

    Dairiki, J.M.; Browne, E.; Firestone, R.B.; Lederer, C.M.; Shirley, V.S.

    1984-01-01

    The Isotopes Project compiles and evaluates nuclear structure and decay data and disseminates these data to the scientific community. From 1940-1978 the Project had as its main objective the production of the Table of Isotopes. Since publication of the seventh (and last) edition in 1978, the group now coordinates its nuclear data evaluation efforts with those of other data centers via national and international nuclear data networks. The group is currently responsible for the evaluation of mass chains A = 167-194. All evaluated data are entered into the International Evaluated Nuclear Structure Data File (ENSDF) and are published in Nuclear Data Sheets. In addition to the evaluation effort, the Isotopes Project is responsible for production of the Radioactivity Handbook

  20. Overview of the JET neutral beam enhancement project

    International Nuclear Information System (INIS)

    Ciric, D.; Brown, D.P.D.; Challis, C.D.; Chuilon, B.; Cox, S.J.; Crowley, B.; Day, I.E.; Edwards, D.C.; Evison, G.; Hackett, L.J.; Hotchin, S.; Hudson, Z.; Jenkins, I.; Jones, T.T.C.; King, R.; Kovari, M.; Martin, D.; Milnes, J.; Parkin, A.; Puma, A. Li

    2007-01-01

    The JET neutral beam (NB) heating system is being upgraded as a part of the ongoing JET Enhancement Programme. This is one of the largest upgrades of the JET machine carried out within the EFDA-JET framework. The main goals of the project are to increase the NB power delivered to JET plasma, to increase the beam pulse duration and to improve the availability and reliability of the JET NB system. The upgrade of the system is being carried out through the modification of the two existing neutral injector boxes (NIBs), each equipped with up to eight positive ion neutral injectors (PINIs). Significant changes of the JET NB system will be carried out within the next few years and will include modification of all PINIs, modification or replacement of various beamline components and corresponding instrumentation, procurement and installation of new high voltage power supply (HVPS) units and corresponding control systems and refurbishment of the 36 kV power distribution. Various physics, engineering and planning issues related to this project, as well as the current status of the project are discussed in detail. Particular attention is given to the results of a PINI prototype test, which are of crucial importance for the successful completion of the entire enhancement programme. Upon the completion of the project in 2009/2010, JET NB system should be capable of delivering more than 34 MW of deuterium beam power into the JET plasma for a duration of up to 20 s with improved reliability. This will significantly enhance overall capabilities of the JET machine in support of ITER development

  1. LLAMA Project

    Science.gov (United States)

    Arnal, E. M.; Abraham, Z.; Giménez de Castro, G.; de Gouveia dal Pino, E. M.; Larrarte, J. J.; Lepine, J.; Morras, R.; Viramonte, J.

    2014-10-01

    The project LLAMA, acronym of Long Latin American Millimetre Array is very briefly described in this paper. This project is a joint scientific and technological undertaking of Argentina and Brazil on the basis of an equal investment share, whose mail goal is both to install and to operate an observing facility capable of exploring the Universe at millimetre and sub/millimetre wavelengths. This facility will be erected in the argentinean province of Salta, in a site located at 4830m above sea level.

  2. Project Avatar

    DEFF Research Database (Denmark)

    Juhlin, Jonas Alastair

    'Project Avatar' tager udgangspunkt i den efterretningsdisciplin, der kaldes Open Source Intelligence og indebærer al den information, som ligger frit tilgængeligt i åbne kilder. Med udbredelsen af sociale medier åbners der op for helt nye typer af informationskilder. Spørgsmålet er; hvor nyttig er...

  3. Project Baltia

    Index Scriptorium Estoniae

    2007-01-01

    Uus arhitektuuriajakiri "Project Baltia" tutvustab Baltimaade, Soome ja Peterburi regiooni arhitektuuri, linnaehitust ja disaini. Ilmub neli korda aastas inglise- ja venekeelsena. Väljaandja: kirjastus Balticum Peterburis koostöös Amsterdami ja Moskva kirjastusega A-Fond. Peatoimetaja Vladimir Frolov

  4. Tedese Project

    Science.gov (United States)

    Buforn, E.; Davila, J. Martin; Bock, G.; Pazos, A.; Udias, A.; Hanka, W.

    The TEDESE (Terremotos y Deformacion Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cadiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnologia with the participation of the GeoforschungZen- trum, Potsdam (GFZ). The aim is to carry out a study of the characteristics of the oc- currence and mechanism of earthquakes together with measurements of crustal struc- ture and deformations in order to obtain an integrated evaluation of seismic risk in southern Spain from. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed in southern Spain and northern Africa for one year beginning in October 2001. The objectives of the project are the study in detail of the focal mechanisms of earthquakes in this area, of structural in crust and upper mantle, of seismic anisotropy in crust and mantle as indicator for tectonic deformation processed and the measure- ments of crustal deformations using techniques with permanent GPS and SLR stations and temporary GPS surveys. From these studies, seismotectonic models and maps will be elaborated and seismic risk in the zone will be evaluated.

  5. Project Boomerang

    Science.gov (United States)

    King, Allen L.

    1975-01-01

    Describes an experimental project on boomerangs designed for an undergraduate course in classical mechanics. The students designed and made their own boomerangs, devised their own procedures, and carried out suitable measurements. Presents some of their data and a simple analysis for the two-bladed boomerang. (Author/MLH)

  6. Project Narrative

    Energy Technology Data Exchange (ETDEWEB)

    Driscoll, Mary C. [St. Bonaventure University, St Bonaventure, NY(United States)

    2012-07-12

    The Project Narrative describes how the funds from the DOE grant were used to purchase equipment for the biology, chemistry, physics and mathematics departments. The Narrative also describes how the equipment is being used. There is also a list of the positive outcomes as a result of having the equipment that was purchased with the DOE grant.

  7. Radiochemistry Project

    International Nuclear Information System (INIS)

    Anon.

    Researches carried out in the 'Radiochemistry Project' of the Agricultural Nuclear Energy Center, Piracicaba, Sao Paulo State, Brazil, are described. Such researches comprise: dosimetry and radiological protection; development of techniques and methods of chemical analysis and radiochemistry. (M.A.) [pt

  8. FLOAT Project

    DEFF Research Database (Denmark)

    Sørensen, Eigil V.; Aarup, Bendt

    The objective of the FLOAT project is to study the reliability of high-performance fibre-reinforced concrete, also known as Compact Reinforced Composite (CRC), for the floats of wave energy converters. In order to reach a commercial breakthrough, wave energy converters need to achieve a lower price...

  9. Hydrology Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the 'Hydrology Project' of the Centro de Energia Nuclear na Agricultura', Piracicaba, Sao Paulo State, Brazil, are described. Such research comprises: Amazon hydrology and Northeast hydrology. Techniques for the measurement of isotope ratios are used. (M.A.) [pt

  10. CHEMVAL project

    International Nuclear Information System (INIS)

    Chandratillake, M.; Falck, W.E.; Read, D.

    1992-01-01

    This report summarises the development history of the CHEMVAL Thermodynamic Database, the criteria employed for data selection and the contents of Version 4.0, issued to participants on the completion of the project. It accompanies a listing of the database constructed using the dBase III + /IV database management package. (Author)

  11. Project COLD.

    Science.gov (United States)

    Kazanjian, Wendy C.

    1982-01-01

    Describes Project COLD (Climate, Ocean, Land, Discovery) a scientific study of the Polar Regions, a collection of 35 modules used within the framework of existing subjects: oceanography, biology, geology, meterology, geography, social science. Includes a partial list of topics and one activity (geodesic dome) from a module. (Author/SK)

  12. Swedish projects

    International Nuclear Information System (INIS)

    Thunell, J.

    1993-01-01

    The main sources of the financing of Swedish research on gas technology are listed in addition to names of organizations which carry out this research. The titles and descriptions of the projects carried out are presented in addition to lists of reports published with information on prices. (AB)

  13. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  14. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  15. Projective measure without projective Baire

    DEFF Research Database (Denmark)

    Schrittesser, David; Friedman, Sy David

    We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal.......We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal....

  16. Engineer, procure, construct (EPC) for nuclear projects in OPG

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, M. [Ontario Power Generation, Toronto, Ontario (Canada)

    2011-07-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  17. Engineer, procure, construct (EPC) for nuclear projects in OPG

    International Nuclear Information System (INIS)

    Elliott, M.

    2011-01-01

    OPG is exploring the use of EPC contracts for Nuclear Plant Design Modifications. Although OPG has used EPC outside of the nuclear island, this new initiative will begin to use EPC inside the plant, including upgrades to existing stations and mid-life refurbishment of Darlington. Benchmarking has shown that apart from new build, nuclear utilities rarely use this method inside the plant so OPG is using a step-by-step approach starting with projects with low complexity and low plant impact. The expected benefits are reduced interfaces and a simplified accountability model leading to schedule and cost improvements and lower rework. Design packages that incorporate construction input before issue will be a significant improvement. OPG's early challenges in moving to EPC include clearly defining roles, responsibilities and interfaces between the vendors and OPG, and modifying governance to match the new model. OPG intends to oversee the work while holding the vendor accountable for needs skill development on both sides. Vendors are expected to establish an engaged organization with complete knowledge of plant conditions, processes and streamlined methods to gain operations input. Vendors are also expected to identify and fix any quality issues before the modifications are commissioned and to have an in-house corrective action program to continuously improve. Vendors' early challenges include presenting one face to OPG rather than a collection of joint venture partners. This presentation describes OPG's plans and early feedback on this exciting new initiative.

  18. Sustainable development in city districts: BaLaLuZ project - BaBeL Lucerne; Schlussbericht Quartier BaBeL - Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Duss, A.; Inderbitzin, J.; Wandeler, M.

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) is one of a series of reports concerning municipal development in various cities in Switzerland. The four city districts involved include Basel (Gundeldinger Feld), Lausanne (Bellevaux), Lucerne (Basel-/Bernstrasse) and Zurich (Werdwies). This final report summarises the results of the first phase of the project concerning the Baselstrasse and Bernstrasse districts in Lucerne. A database containing details of the various buildings in the districts was set up, energy-relevant refurbishment of buildings was investigated, owners were counselled and various diploma-theses for the University of Applied Sciences in Lucerne were initiated. Ecological, economical and mobility aspects are considered and suggestions are made for follow-up projects.

  19. Annx IV. Delayed nuclear power plant project management experience Cernavoda 2 NPP, Romania

    International Nuclear Information System (INIS)

    2008-01-01

    greater contingency due to the uncertainty of the legacy equipment inventory, the possible effect of code changes during the legacy period, and the possibility of schedule extensions. One of the critical success factors for the construction restart of Cernavoda NPP Unit 2 was the condition and assessment of existing material and equipment stored in the warehouses or installed in the field. A preservation program was implemented separately for site-installed materials and managed through the construction division. Subsequently, a refurbishment program was also implemented on identified equipment, which including checking and testing of equipment and changing materials defined as obsolete or undesirable for further use in operation of equipment. For the most part, the extent of testing of equipment is the same as for a new build project. However, some major components require additional testing which should be performed early enough in the program to take corrective action if required. A good example of this is the Main Output Transformers T01, and T02, which were manufactured 20 years ago by Electroputere in Romania. These transformers have been preserved on site and recently refurbished. The Cernavoda 2 Project provided many opportunities to better define the correct approach to a successful completion of a delayed project. Most significant is the need to have a full assessment and definition of the remaining scope of work before the beginning of the Completion Contract. In conclusion, MT Project Management team adapted their work processes and procedures to suit the specificity and challenges of the Cernavoda 2 project. Interfaces with internal groups and external organizations were optimized through efficient communication processes. This allowed timely identification of issues through to the Engineering, Procurement, Construction, Planning, and Commissioning organizations. It was clearly demonstrated that teamwork, creativity and dedication to quality and productivity

  20. Project Radon

    International Nuclear Information System (INIS)

    Ekholm, S.

    1988-01-01

    The project started in March 1987. The objective is to perform radon monitoring in 2000 dwellings occupied by people employed by State Power Board and to continue to contribute to the development of radon filters. The project participates in developing methods for radon measurement and decontamination and in adapting the methods to large scale application. About 400 so called radon trace measurements (coarse measurement) and about 10 action measurements (decontamination measurement) have been made so far. Experience shows that methods are fully applicable and that the decontamination measures recommended give perfectly satisfactory results. It is also established that most of the houses with high radon levels have poor ventilation Many of them suffer from moisture and mould problems. The work planned for 1988 and 1989 will in addition to measurements be directed towards improvement of the measuring methods. An activity catalogue will be prepared in cooperation with ventilation enterprises. (O.S.)

  1. PARTNER Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy uses particle beams to treat tumours located near critical organs and tumours that respond poorly to conventional radiation therapy. It has become evident that there is an emerging need for reinforcing research in hadrontherapy and it is essential to train professionals in this rapidly developing field. PARTNER is a 4-year Marie Curie Training project funded by the European Commission with 5.6 million Euros aimed at the creation of the next generation of experts. Ten academic institutes and research centres and two leading companies are participating in PARTNER, that is coordinated by CERN, forming a unique multidisciplinary and multinational European network. The project offers research and training opportunities to 25 young biologists, engineers, physicians and physicists and is allowing them to actively develop modern techniques for treating cancer in close collaboration with leading European Institutions. For this purpose PARTNER relies on cutting edge research and technology development, ef...

  2. Swedish projects

    International Nuclear Information System (INIS)

    Thunell, J.

    1992-01-01

    A description is given of research activities, concerning heating systems, which were carried out in Sweden during 1991. The main subject areas dealt with under the gas technology group within the area of heating systems were catalytic combustion, polyethylene materials, and gas applications within the paper and pulp industries. A list is given of the titles of project reports published during 1991 and of those begun during that year. Under the Swedish Centre for Gas Technology (SGC), the main areas of research regarding gas applications were polyethylene materials, industrial applications and the reduction of pollutant emissions. A detailed list is given of research projects which were in progress or proposed by March 1992 under the heating system gas technology research group in Sweden. This list also presents the aims and descriptions of the methods, etc. (AB)

  3. AVE project

    International Nuclear Information System (INIS)

    2004-01-01

    During 1998, ANAV began to optimize Human Resources to cope with the ERE and ANA-ANV integration. Project AVE was intended to achieve an orderly transfer of know-how, skills, attitudes and experiences. The most complex part was renovation of personnel with Operating Licenses. Nearly 140 people had joined the organization by late December 2003. This opportunity was seized to draw up a new Training Manual, and a common Initial Training Plan was designed for the two plants, accounting for the singularities of each one. The plan is divided into 5 modules: Common Training, Specific Training, PEI/CAT, Management, and on-the-job Training. The training environments were defined according to the nature of the capabilities to be acquired. Project AVE resulted in the merger of the Asco and Vandellos II Training services. (Author)

  4. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  5. ARTIST Project

    CSIR Research Space (South Africa)

    Ferguson, K

    2012-10-01

    Full Text Available Biennial Conference Presented by: Keith Ferguson Date: 9 October 2012 Mobile IPTV Broadcasting Platform Consortium: CSIR, UCT, ECA Funded by TIA 2008-2011 ARTIST Project Min time - sacrifice quality Max quality - sacrifice time Application Context... idth > ARTIST Platform Advertiser Client 1 Client 2 Client 3 Client 4 Sport channel News channel Wildlife channel Advert database Transaction database Transcoder Servers Media Switching Servers INTERNET Channel viewing Advert upload...

  6. CARA project

    International Nuclear Information System (INIS)

    Bergallo, Juan E.; Brasnarof, Daniel O.

    2000-01-01

    The CARA (Advanced Fuels for Argentine Reactors) Project successfully completed its first stage, phase one, last year. The performance of this fuel has been partially examined, using CNEA and CONUAR facilities and personnel. With the results obtained in this stage, determined by the corresponding tests and verification of the fuel behavior, the performance of the second stage started immediately afterwards. Works performed and results obtained during the development of the second stage are generally described in this paper. (author)

  7. Polytope projects

    CERN Document Server

    Iordache, Octavian

    2013-01-01

    How do you know what works and what doesn't? This book contains case studies highlighting the power of polytope projects for complex problem solving. Any sort of combinational problem characterized by a large variety of possibly complex constructions and deconstructions based on simple building blocks can be studied in a similar way. Although the majority of case studies are related to chemistry, the method is general and equally applicable to other fields for engineering or science.

  8. Projection Methods

    DEFF Research Database (Denmark)

    Wagner, Falko Jens; Poulsen, Mikael Zebbelin

    1999-01-01

    When trying to solve a DAE problem of high index with more traditional methods, it often causes instability in some of the variables, and finally leads to breakdown of convergence and integration of the solution. This is nicely shown in [ESF98, p. 152 ff.].This chapter will introduce projection...... methods as a way of handling these special problems. It is assumed that we have methods for solving normal ODE systems and index-1 systems....

  9. Project Phaseolus

    International Nuclear Information System (INIS)

    Anon.

    Research carried out through the Phaseolus Project of the 'Centro de Energia Nuclear na Agricultura' (CENA) Piracicaba, Sao Paulo State, Brazil, is described. It comprises the following subject s: plant breeding; nitrogen fixation; tissue cultures; proteins; photosynthetic efficiency; soil-plant interactions; electron microscopy of the golden mosaic virus; pest control; production of 15 N-enriched ammonium sulfate, and determination of elements in the beans plant. (M.A.) [pt

  10. Numatron project

    Energy Technology Data Exchange (ETDEWEB)

    Sugimoto, K [Osaka Univ., Toyonaka (Japan). Dept. of Physics; Hirao, Yasuo

    1977-04-01

    A project of high energy heavy ion acceleration is under consideration. The high energy heavy ions can produce highly condensed states of nuclei. A new phase of nucleus would be seen at the incident energy higher than 140 MeV/nucleon. High energy heavy ions causing high density states and meson emission will produce various new nuclides. Process of formation of atomic elements will be studied. Various fields of science can be also investigated by the high energy heavy ions. Spectroscopic study of multi-valent ions will be made high energy uranium. Study of materials for the fusion reactor is important. Impurity heavy ion from the wall of the fusion reactor may lose the energy of the reactor, and the characteristic features of heavy ions should be investigated. The highly ionized states of atoms are also produced by heavy ion injection into material. Several projects of heavy ion acceleration are in progress in the world. The Numatron project in Japan is to construct a combination machine of a Cockcroft type machine, three linear accelerator and a synchrotron. The planned energy of the machine is 670 MeV/nucleon. Technical problems are under investigation.

  11. Analogue to digital upgrade project-boiler feedwater control system for Bruce Power nuclear units 1 & 2

    International Nuclear Information System (INIS)

    Long, R.

    2012-01-01

    Bruce Power Nuclear Generating Station A, “Bruce A” is in the final stages of its Restart Project. This capital project will see a large scale rehabilitation of Units 1 and 2 resulting in addition of 1500MW of safe, reliable, clean electricity to the Ontario grid. Restart Project Scope 375, Boiler Feedwater Controls Upgrade was sanctioned to replace obsolete analog devices with a modern digital control system. This project replaced the existing Foxboro H Line analog controls which comprised of 81 individual control modules and support instrumentation. The replacement system was a Triconex Triple Modular Redundant PLC which interfaces with two redundant touch screen monitors. The upgraded digital system incorporates the following controls: 1. Boiler Level Control Loops 2. Dearator Level Control Loops 3. Dearator Pressure Control Loops 4. Boiler Feedwater Recirculation Flow Control Loops A number of technical challenges were addressed when installing a new digital system within the existing plant configuration. Interfaces to new, old and refurbished field devices must be understood as well as implications of connecting to the plant’s Digital Control Computers (DCC’s) and newly installed Steam Generators. The overall project involved many stakeholders to address various requirements from conceptual / design stage through procurement, construction, commissioning and return to service. In addition, the project highlighted the unique requirements found in Nuclear Industry with respect to Human Factors and Software Quality Assurance. (author)

  12. Coloss project

    International Nuclear Information System (INIS)

    2005-01-01

    The COLOSS project was a shared-cost action, co-ordinated by IRSN within the Euratom Research Framework Programme 1998-2002. Started in February 2000, the project lasted three years. The work-programme performed by 19 partners was shaped around complementary activities aimed at improving severe accident codes. Unresolved risk-relevant issues regarding H2 production, melt generation and the source term were studied, through a large number of experiments such as a) dissolution of fresh and high burn-up UO 2 and MOX by molten Zircaloy, b) simultaneous dissolution of UO 2 and ZrO 2 by molten Zircaloy, c) oxidation of U-O-Zr mixtures by steam, d) degradation-oxidation of B 4 C control rods. Significant results have been produced from separate-effects, semi-global and large-scale tests on COLOSS topics. Break-through were achieved on some issues. Nevertheless, more data are needed for consolidation of the modelling on burn-up effects on UO 2 and MOX dissolution and on oxidation of U-O-Zr and B 4 C-metal mixtures. There was experimental evidence that the oxidation of these mixtures can contribute significantly to the large H2 production observed during the reflooding of degraded cores under severe accident conditions. Based on the experimental results obtained on the COLOSS topics, corresponding models were developed and were successfully implemented in several severe accident codes. Upgraded codes were then used for plant calculations to evaluate the consequences of new models on key severe accident sequences occurring in different plants designs involving B 4 C control rods (EPR, BWR, VVER- 1000) as well as in the TMI-2 accident. The large series of plant calculations involved sensitivity studies and code benchmarks. Main severe accident codes in use in the EU for safety studies were used such as ICARE/CATHARE, SCDAP/RELAP5, ASTEC, MELCOR and MAAP4. This activity enabled: a) the assessment of codes to calculate core degradation, b) the identification of main

  13. Project Exodus

    Science.gov (United States)

    1990-01-01

    Project Exodus is an in-depth study to identify and address the basic problems of a manned mission to Mars. The most important problems concern propulsion, life support, structure, trajectory, and finance. Exodus will employ a passenger ship, cargo ship, and landing craft for the journey to Mars. These three major components of the mission design are discussed separately. Within each component the design characteristics of structures, trajectory, and propulsion are addressed. The design characteristics of life support are mentioned only in those sections requiring it.

  14. CAREM Project

    International Nuclear Information System (INIS)

    Ishida, Viviana; Gomez, Silvia

    2001-01-01

    CAREM project consists on the development and design of an advanced nuclear power plant. CAREM is a very low power innovative reactor conceived with new generation design solutions. Based on an indirect cycle integrated light water reactor using enriched uranium, CAREM has some distinctive features that greatly simplify the reactor and also contribute to a high level of safety: integrated primary system, primary system cooling by natural convection, self pressurization, and passive safety systems. In order to verify its innovative features the construction of a prototype is planned. (author)

  15. PORTNUS Project

    Energy Technology Data Exchange (ETDEWEB)

    Loyal, Rebecca E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-07-14

    The objective of the Portunus Project is to create large, automated offshore ports that will the pace and scale of international trade. Additionally, these ports would increase the number of U.S. domestic trade vessels needed, as the imported goods would need to be transported from these offshore platforms to land-based ports such as Boston, Los Angeles, and Newark. Currently, domestic trade in the United States can only be conducted by vessels that abide by the Merchant Marine Act of 1920 – also referred to as the Jones Act. The Jones Act stipulates that vessels involved in domestic trade must be U.S. owned, U.S. built, and manned by a crew made up of U.S. citizens. The Portunus Project would increase the number of Jones Act vessels needed, which raises an interesting economic concern. Are Jones Act ships more expensive to operate than foreign vessels? Would it be more economically efficient to modify the Jones Act and allow vessels manned by foreign crews to engage in U.S. domestic trade? While opposition to altering the Jones Act is strong, it is important to consider the possibility that ship-owners who employ foreign crews will lobby for the chance to enter a growing domestic trade market. Their success would mean potential job loss for thousands of Americans currently employed in maritime trade.

  16. FLORAM project

    Energy Technology Data Exchange (ETDEWEB)

    Zulauf, W E [Sao Paolos Environmental Secretariat, Sao Paolo (Brazil); Goelho, A S.R. [Riocell, S.A. (Brazil); Saber, A [IEA-Instituto de Estudos Avancados (Brazil); and others

    1996-12-31

    The project FLORAM was formulated at the `Institute for Advanced Studies` of the University of Sao Paulo. It aims at decreasing the level of carbon dioxide in the atmosphere and thus curbing the green-house effect by way of a huge effort of forestation and reforestation. The resulting forests when the trees mature, will be responsible for the absorption of about 6 billion tons of excess carbon. It represents 5 % of the total amount of CO{sub 2} which is in excess in the earth`s atmosphere and represents 5 % of the available continental surfaces which can be forested as well. Therefore, if similar projects are implemented throughout the world, in theory all the exceeding CO{sub 2}, responsible for the `greenhouse effect`, (27 % or 115 billion tons of carbon) would be absorbed. Regarding this fact, there would be a 400 million hectar increase of growing forests. FLORAM in Brazil aims to plant 20.000.000 ha in 2 years at a cost of 20 billion dollars. If it reaches its goals that will mean that Brazil will have reforested an area almost half as big as France. (author)

  17. FLORAM project

    Energy Technology Data Exchange (ETDEWEB)

    Zulauf, W.E. [Sao Paolos Environmental Secretariat, Sao Paolo (Brazil); Goelho, A.S.R. [Riocell, S.A. (Brazil); Saber, A. [IEA-Instituto de Estudos Avancados (Brazil)] [and others

    1995-12-31

    The project FLORAM was formulated at the `Institute for Advanced Studies` of the University of Sao Paulo. It aims at decreasing the level of carbon dioxide in the atmosphere and thus curbing the green-house effect by way of a huge effort of forestation and reforestation. The resulting forests when the trees mature, will be responsible for the absorption of about 6 billion tons of excess carbon. It represents 5 % of the total amount of CO{sub 2} which is in excess in the earth`s atmosphere and represents 5 % of the available continental surfaces which can be forested as well. Therefore, if similar projects are implemented throughout the world, in theory all the exceeding CO{sub 2}, responsible for the `greenhouse effect`, (27 % or 115 billion tons of carbon) would be absorbed. Regarding this fact, there would be a 400 million hectar increase of growing forests. FLORAM in Brazil aims to plant 20.000.000 ha in 2 years at a cost of 20 billion dollars. If it reaches its goals that will mean that Brazil will have reforested an area almost half as big as France. (author)

  18. SISCAL project

    Science.gov (United States)

    Santer, Richard P.; Fell, Frank

    2003-05-01

    The first "ocean colour" sensor, Coastal Zone Color Scanner (CZCS), was launched in 1978. Oceanographers learnt a lot from CZCS but it remained a purely scientific sensor. In recent years, a new generation of satellite-borne earth observation (EO) instruments has been brought into space. These instruments combine high spectral and spatial resolution with revisiting rates of the order of one per day. More instruments with further increased spatial, spectral and temporal resolution will be available within the next years. In the meantime, evaluation procedures taking advantage of the capabilities of the new instruments were derived, allowing the retrieval of ecologically important parameters with higher accuracy than before. Space agencies are now able to collect and to process satellite data in real time and to disseminate them via the Internet. It is therefore meanwhile possible to envisage using EO operationally. In principle, a significant demand for EO data products on terrestrial or marine ecosystems exists both with public authorities (environmental protection, emergency management, natural resources management, national parks, regional planning, etc) and private companies (tourist industry, insurance companies, water suppliers, etc). However, for a number of reasons, many data products that can be derived from the new instruments and methods have not yet left the scientific community towards public or private end users. It is the intention of the proposed SISCAL (Satellite-based Information System on Coastal Areas and Lakes) project to contribute to the closure of the existing gap between space agencies and research institutions on one side and end users on the other side. To do so, we intend to create a data processor that automatically derives and subsequently delivers over the Internet, in Near-Real-Time (NRT), a number of data products tailored to individual end user needs. The data products will be generated using a Geographical Information System (GIS

  19. Project Financing

    OpenAIRE

    S. GATTI

    2005-01-01

    Στην εισαγωγή της παρούσας εργασίας δίνεται ο ορισμός του project financing, τα ιστορικά στοιχεία και οι τάσεις αγοράς του. Στο πρώτο κεφάλαιο αναφέρεται γιατί οι εταιρείες προτιμούν την χρηματοδότηση με project financing. Γίνεται λόγος για τα πλεονεκτήματά του έναντι της άμεσης χρηματοδότησης, καθώς και για τα μειονεκτήματα του project financing. Στο δεύτερο κεφάλαιο παρουσιάζονται τα χρηματοοικονομικά στοιχεία και ο ρόλος του χρηματοοικονομικού συμβούλου. Στην τρίτη ενότητα γίνεται η αναγνώ...

  20. Project: Ultracentrifuges

    International Nuclear Information System (INIS)

    Olea C, O.

    1990-07-01

    The trans elastic ultracentrifuge of magnetic suspension, is an instrument that arose of an interdisciplinary group directed by the Dr. James Clark Keith where it was projected, designed and built a centrifuge that didn't exist, to be applied in forced diffusion of uranium, like one of the many application fields. The written present, has as purpose to give to know the fundamental physical principles of this technology, its fundamental characteristics of design, the application of this in the separation process of isotopes, as well as the previous studies and essential control parameters in the experimental processes, the same thing that, the most outstanding results and the detection systems used in the confirmation and finally, the carried out potential applications of the principles of the ultracentrifugation technology. (Author)

  1. ENVISION Project

    CERN Multimedia

    Ballantine, A; Dixon-Altaber, H; Dosanjh, M; Kuchina, L

    2011-01-01

    Hadrontherapy is a highly advanced technique of cancer radiotherapy that uses beams of charged particles (ions) to destroy tumour cells. While conventional X-rays traverse the human body depositing radiation as they pass through, ions deliver most of their energy at one point. Hadrontherapy is most advantageous once the position of the tumour is accurately known, so that healthy tissues can be protected. Accurate positioning is a crucial challenge for targeting moving organs, as in lung cancer, and for adapting the irradiation as the tumour shrinks with treatment. Therefore, quality assurance becomes one of the most relevant issues for an effective outcome of the cancer treatment. In order to improve the quality assurance tools for hadrontherapy, the European Commission is funding ENVISION, a 4-year project that aims at developing solutions for: real-• time non invasive monitoring • quantitative imaging • precise determination of delivered dose • fast feedback for optimal treatment planning • real-t...

  2. EUROTRAC projects

    International Nuclear Information System (INIS)

    Slanina, J.; Arends, B.G.; Wyers, G.P.

    1992-07-01

    The projects discussed are BIATEX (BIosphere-ATmosphere EXchange of pollutants), ACE (Acidity in Clouds Experiment) and GCE (Ground-based Cloud Experiment). ECN also coordinates BIATEX and contributes to the coordination of EUROTRAC. Research in BIATEX is aimed at the development of equipment, by which atmosphere-surface interactions of air pollution can be quantified. A ion chromatograph, connected to a rotating denuder, is developed to be applicated in the field for on-line analysis of denuder extracts and other samples. To investigate dry deposition of ammonia a continuous-flow denuder has been developed. A thermodenuder system to measure the concentrations of HNO 3 and NH 4 NO 3 in the ambient air is optimized to determine depositions and is part of the ECN monitoring station in Zegveld, Netherlands. An aerosol separation technique, based on a cyclone separator, has also been developed. All this equipment has been used in field experiments above wheat and heather. An automated monitoring station for long-term investigations of NH 3 , HNO 3 and SO 2 dry deposition on grassland and the impact of the deposition on the presence and composition of water films has been set up and fully tested. Research in GCE concerns the uptake and conversion of air pollution in clouds (cloud chemistry). Measuring equipment from several collaborative institutes has been specified and calibrated in a cloud chamber at ECN. The ECN contribution is the determination of the gas phase composition and the micro-physical characterization of the clouds. Measurement campaigns were carried out in the Po area (Italy) in fog, and in Kleiner Feldberg near Frankfurt, Germany, in orographic clouds. Estimations are given of the deposition of fog water and cloud water on forests in the Netherlands and the low mountain range in Germany. The project ACE was not started because of financial reasons and will be reconsidered. 26 figs., 1 tab., 3 apps., 34 refs

  3. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  4. Project LASER

    Science.gov (United States)

    1990-01-01

    NASA formally launched Project LASER (Learning About Science, Engineering and Research) in March 1990, a program designed to help teachers improve science and mathematics education and to provide 'hands on' experiences. It featured the first LASER Mobile Teacher Resource Center (MTRC), is designed to reach educators all over the nation. NASA hopes to operate several MTRCs with funds provided by private industry. The mobile unit is a 22-ton tractor-trailer stocked with NASA educational publications and outfitted with six work stations. Each work station, which can accommodate two teachers at a time, has a computer providing access to NASA Spacelink. Each also has video recorders and photocopy/photographic equipment for the teacher's use. MTRC is only one of the five major elements within LASER. The others are: a Space Technology Course, to promote integration of space science studies with traditional courses; the Volunteer Databank, in which NASA employees are encouraged to volunteer as tutors, instructors, etc; Mobile Discovery Laboratories that will carry simple laboratory equipment and computers to provide hands-on activities for students and demonstrations of classroom activities for teachers; and the Public Library Science Program which will present library based science and math programs.

  5. Project Longshot

    Science.gov (United States)

    West, J. Curtis; Chamberlain, Sally A.; Stevens, Robert; Pagan, Neftali

    1989-01-01

    Project Longshot is an unmanned probe to our nearest star system, Alpha Centauri, 4.3 light years away. The Centauri system is a trinary system consisting of two central stars (A and B) orbiting a barycenter, and a third (Proxima Centauri) orbiting the two. The system is a declination of -67 degrees. The goal is to reach the Centauri system in 50 years. This time space was chosen because any shorter time would be impossible of the relativistic velocities involved, and any greater time would be impossible because of the difficulty of creating a spacecraft with such a long lifetime. Therefore, the following mission profile is proposed: (1) spacecraft is assembled in Earth orbit; (2) spacecraft escapes Earth and Sun in the ecliptic with a single impulse maneuver; (3) spacecraft changed declination to point toward Centauri system; (4) spacecraft accelerates to 0.1c; (5) spacecraft coasts at 0.1c for 41 years; (6) spacecraft decelerates upon reaching Centauri system; and (7) spacecraft orbits Centauri system, conducts investigations, and relays data to Earth. The total time to reach the Centauri system, taking into consideration acceleration and deceleration, will be approximately 50 years.

  6. Research report for fiscal 1998 on the basic research on the promotion of joint implementation and so forth. Energy project for Shenyang Iron and Steel Complex in Liaoning Province; 1998 nendo Liaoning sho Shenyang kotetsu soheisho shoene project chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The above complex is surveyed for the promotion of CDM (clean development mechanism) which is a flexibility measure in the Kyoto Protocol. The 4 existing 7.5-ton electric furnaces are antiquated and high in electric power consumption rate, and cause much dust pollution. A project is worked out, under which the furnace volume will be reduced to save energy and to realize environmental friendliness. The project aims to save power, reduce greenhouse gas emission, and settle environmental problems such as dust generation. The refurbishment will reduce greenhouse gas by 27,211 tons a year in the case of a 100,000 tons/year-capable plant. This means 663 tons of CO2 per 100-million yen of invested capital. As for funding, the reimbursing trade scheme is studied as a means for procuring funds from aboard for capital investment. This seems not practical, however, due to the circumstances the project finds itself under. Financial aids such as an environmental preservation related yen loan from the Japanese Government will be studied. Japan's iron and steel manufacturing industry entertains numerous environmentally friendly and energy efficient technologies earned over its long history, and many of them are found to be excellently compatible with the current circumstances in China. It is believed that an energy-efficient, environmentally friendly model to be constructed under this project will certainly gather popularity in China. (NEDO)

  7. Research report for fiscal 1998 on the basic research on the promotion of joint implementation and so forth. Energy project for Shenyang Iron and Steel Complex in Liaoning Province; 1998 nendo Liaoning sho Shenyang kotetsu soheisho shoene project chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-01

    The above complex is surveyed for the promotion of CDM (clean development mechanism) which is a flexibility measure in the Kyoto Protocol. The 4 existing 7.5-ton electric furnaces are antiquated and high in electric power consumption rate, and cause much dust pollution. A project is worked out, under which the furnace volume will be reduced to save energy and to realize environmental friendliness. The project aims to save power, reduce greenhouse gas emission, and settle environmental problems such as dust generation. The refurbishment will reduce greenhouse gas by 27,211 tons a year in the case of a 100,000 tons/year-capable plant. This means 663 tons of CO2 per 100-million yen of invested capital. As for funding, the reimbursing trade scheme is studied as a means for procuring funds from aboard for capital investment. This seems not practical, however, due to the circumstances the project finds itself under. Financial aids such as an environmental preservation related yen loan from the Japanese Government will be studied. Japan's iron and steel manufacturing industry entertains numerous environmentally friendly and energy efficient technologies earned over its long history, and many of them are found to be excellently compatible with the current circumstances in China. It is believed that an energy-efficient, environmentally friendly model to be constructed under this project will certainly gather popularity in China. (NEDO)

  8. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  9. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  10. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  11. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  12. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  13. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  14. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  15. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  16. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  17. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  18. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  19. FY 1999 report on basic survey project for joint implementations, etc. Feasibility study on energy conservation at Norsi Refinery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project is to link in the future to COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change) joint implementations, etc. Taken up in this survey are a topping unit, vacuum distillation unit, catalytic reforming unit, and a middle cut desulfurization unit. The purpose of the refurbishment is to conserve energy. It is estimated that 48000 TOE/year of energy will be saved and that there will be a 1.2-million tons-CO2/year reduction in greenhouse gas emissions. It is predicted that an amount equivalent to 1.3% of Russia's 1997 oil consumption will be saved across Russia and that there will be a greenhouse gas reduction equivalent to 8.8% of what Japan plans to reduce. The main problem to solve before execution of this project is in the raising of funds. Although Russia hopes that Japan will invest in the project, such at the present stage will be a high-risk venture now that the Russian economic situation and the details (CO2 emission trading, etc.) of its joint implementation framework are not yet definite. The reasonable way for Japan to follow will be to support Russia as a buyer using credits with Russia acting as the principle party. (NEDO)

  20. FY 1999 report on basic survey project for joint implementations, etc. Feasibility study on energy conservation at Norsi Refinery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This project is to link in the future to COP3 (Third Session of the Conference of the Parties to the United Nations Framework Convention on Climate Change) joint implementations, etc. Taken up in this survey are a topping unit, vacuum distillation unit, catalytic reforming unit, and a middle cut desulfurization unit. The purpose of the refurbishment is to conserve energy. It is estimated that 48000 TOE/year of energy will be saved and that there will be a 1.2-million tons-CO2/year reduction in greenhouse gas emissions. It is predicted that an amount equivalent to 1.3% of Russia's 1997 oil consumption will be saved across Russia and that there will be a greenhouse gas reduction equivalent to 8.8% of what Japan plans to reduce. The main problem to solve before execution of this project is in the raising of funds. Although Russia hopes that Japan will invest in the project, such at the present stage will be a high-risk venture now that the Russian economic situation and the details (CO2 emission trading, etc.) of its joint implementation framework are not yet definite. The reasonable way for Japan to follow will be to support Russia as a buyer using credits with Russia acting as the principle party. (NEDO)

  1. I-15 North Project

    Science.gov (United States)

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  2. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  3. USAID Anticorruption Projects Database

    Data.gov (United States)

    US Agency for International Development — The Anticorruption Projects Database (Database) includes information about USAID projects with anticorruption interventions implemented worldwide between 2007 and...

  4. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  5. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  6. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  7. Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

    Science.gov (United States)

    Stewart, Camiren L.

    2014-01-01

    With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its

  8. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  9. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  10. The virtual GULLIVER project

    NARCIS (Netherlands)

    Trappl, R.; Nijholt, Antinus; Stuk, M.; Zwiers, Jakob

    2002-01-01

    In this paper we discuss our virtual reality project Gulliver. This project is part of a more comprehensive project conceived by two artists, Matjaž Štuk and Alena Hudcovicová, called “Gulliver’s Museum of Living Art��?. Our part of the project involves a virtual reality version of Swift’s Gulliver

  11. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  12. The 100 People Project

    Science.gov (United States)

    McLeod, Keri

    2007-01-01

    This article describes the 100 People Project and how the author integrates the project in her class. The 100 People Project is a nonprofit organization based in New York City. The organization poses the question: If there were only 100 people in the world, what would the world look like? Through the project, students were taught about ethics in…

  13. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  14. RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  15. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  16. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  17. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  18. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  19. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  20. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  1. Project Finance: Basic Components

    OpenAIRE

    Alfieri Li Ojeda, Jaime

    2015-01-01

    The natural speed of the contemporary world demands large investment projects which require specialized financial techniques such as Project Finance, defined as a fund to finance investment projects of great magnitude. Every Project Finance involves a wide range of elements such as promoters, government, contractors andsuppliers, among others, that will ensure project success. La rapidez del mundo contemporáneo exige que los grandes proyectos de inversión requieran de técnicas financieras ...

  2. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  3. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  4. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  5. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  6. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  7. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  8. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  9. SOL-PAC: Integrated solar heating and heat pump systems for refurbished buildings - Performance analysis; SOL-PAC: analyse des performances du couplage d'une pompe a chaleur avec une installation solaire thermique pour la renovation - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Citherlet, C.; Bony, J.; Nguyen, B.

    2008-07-01

    The purpose of this study is to evaluate the energetic and economic performances of various types of brine/water heat pumps coupled with a fan coil fitted with solar collectors. Different indicators such as the annual coefficient of performance or the electricity consumption have been compared between the different analysed systems. The optimization of the energy control system and energy storage was investigated in order to reduce the operation time of the fan coil. This study has been performed using the TRNSYS computerized simulation package. The icing of the fan coil as well as its defrosting cycles could not been taken into account within the framework of this project, because of a lack of a numerical model. At current electricity prices, the most economical solution remains the heat pump without solar collectors. However, from an energy point of view, the annual overall coefficient of performance of the installation may be improved by 15 to 36%, depending on the climate, thanks to the coupling with solar collectors. (author)

  10. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  11. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  12. Cost estimating for large nuclear projects

    International Nuclear Information System (INIS)

    Duggal, A.; Hunt, M.

    2004-01-01

    In today's market, the generation of electricity is a very competitive business, which is constantly under the watchful eye of the media and public. Nuclear power faces a lot of competition from other sources such as hydro, coal and gas. Controlling costs, monitoring costs, feedback, industry knowledge and up to date cost estimating tools are essential for a nuclear company to compete on a long term basis. This paper reviews the terminology and estimating principles used for the construction of new nuclear plants, lifetime operating costs, and the costs associated with refurbishment work. (author)

  13. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  14. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  15. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  16. The Phebus FP project

    International Nuclear Information System (INIS)

    Delchambre, P.; Von der Hardt, P.

    1989-01-01

    This report summarizes the pre-project studies concerning the PHEBUS FP facility. After recalling the programme objectives, it describes the projected modifications to the PHEBUS reactor, outlines new installations and justifies the selected options

  17. Number projection method

    International Nuclear Information System (INIS)

    Kaneko, K.

    1987-01-01

    A relationship between the number projection and the shell model methods is investigated in the case of a single-j shell. We can find a one-to-one correspondence between the number projected and the shell model states

  18. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  19. Unicycle Project Report

    OpenAIRE

    Thomson, S

    2010-01-01

    The Unicycle project implemented an institutional Open Educational Resource repository with a view to ensuring sustainability in approach by embedding OER as an Assessment, Learning and Teaching strategy. This is the final submitted report for the project.

  20. Collaborative Contracting in Projects

    NARCIS (Netherlands)

    Suprapto, M.

    2016-01-01

    Project practitioners have increasingly recognized the importance of collaborative relationships to ensure successful executions of projects. However, the ability to sustain and consistenly drive real collaborative attitudes and behavior for achieving the desired outcomes remains of enduring

  1. Project Tasks in Robotics

    DEFF Research Database (Denmark)

    Sørensen, Torben; Hansen, Poul Erik

    1998-01-01

    Description of the compulsary project tasks to be carried out as a part of DTU course 72238 Robotics......Description of the compulsary project tasks to be carried out as a part of DTU course 72238 Robotics...

  2. Venezuela's Bolivarian Schools Project.

    Science.gov (United States)

    Diaz, Maria Magnolia Santamaria

    2002-01-01

    Discusses efforts by the Venezuelan government to improve the nation's school infrastructure through the Bolivarian Schools Project administered by the Ministry of Education, Culture and Sport. The project set educational principles which are guiding current school building efforts. (EV)

  3. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  4. The Alzheimer's Project

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues The Alzheimer's Project Past Issues / Spring 2009 Table of Contents ... of this page please turn Javascript on. The Alzheimer's Project A 4-Part Documentary Series Starting May ...

  5. Capital Projects Application (CPA)

    Data.gov (United States)

    General Services Administration — Capital Projects application (CPA) provides users with the ability to maintain project related financial data for Budget Activity (BA) 51, 55, 64, 01, 02, 03, 04....

  6. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  7. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  8. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  9. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  10. The Dwarf Project: Vidojevica

    Science.gov (United States)

    Vince, O.

    2013-05-01

    The DWARF project is an important international project for observing eclipsing binary stars and searching for third companion which orbit around both stars. Recently, a group of researchers at the Astronomical Observatory of Belgrade joined this project using the 60 cm telescope at the Astronomical Station Vidojevica for observations. All the equipment and the human potential involved with this project from Serbia will be described in this paper.

  11. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  12. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  13. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  14. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  15. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  16. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  17. The Llama Project.

    Science.gov (United States)

    Ganzel, Candy; Stuglik, Jan

    2003-01-01

    At a suburban Indiana elementary school, the Project Approach serves as the basis of the curriculum in all Kindergarten classrooms. The four classes of 5- and 6-year-old children at this school chose to study llamas. This article discusses how the project evolved, describes the three phases of the project, and provides teachers' reflections on the…

  18. Nuclear safety projects 1995

    International Nuclear Information System (INIS)

    Carl-Erik Christoffersen

    1996-01-01

    Action plans for the prevention of contamination in the Arctic regions is concretized in a number of international projects. The Norwegian Radiation Protection Authority is responsible for the follow-up of 13 projects. The report describes the development of these projects in 1995

  19. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  20. Mayan Forest Road Projects

    DEFF Research Database (Denmark)

    Conde, Dalia Amor

    2008-01-01

    Road-building projects in the Mayan Biosphere Reserve to connect Mexico and Guatemala were subjected to a cost-benefit evaluation. Up to an estimated 311,000 hectares of jaguar habitat were found to be at risk of deforestation due to these projects. Some of the projects were shown to have negativ...... of continued conservation rather than road development....

  1. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  2. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  3. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  4. Humane Education Projects Handbook.

    Science.gov (United States)

    Junior League of Ogden, UT.

    This handbook was developed to promote interest in humane education and to encourage the adoption of humane education projects. Although specifically designed to assist Junior Leagues in developing such projects, the content should prove valuable to animal welfare organizations, zoos, aquariums, nature centers, and other project-oriented groups…

  5. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  6. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  7. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  8. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  9. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  10. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  11. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  12. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  13. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  14. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  15. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  16. Progress Report on the GROWTH (GNSS Reflectometry for Ocean Waves, Tides, and Height) Research Project

    Science.gov (United States)

    Kitazawa, Y.; Ichikawa, K.; Akiyama, H.; Ebinuma, T.; Isoguchi, O.; Kimura, N.; Konda, M.; Kouguchi, N.; Tamura, H.; Tomita, H.; Yoshikawa, Y.; Waseda, T.

    2016-12-01

    Global Navigation Satellite Systems (GNSS), such as GPS is a system of satellites that provide autonomous geo-spatial positioning with global coverage. It allows small electronic receivers to determine their location to high precision using radio signals transmitted from satellites, GNSS reflectometry (GNSS-R) involves making measurements from the reflections from the Earth of navigation signals from GNSS satellites. Reflected signals from sea surface are considered that those are useful to observe sea state and sea surface height. We have started a research program for GNSS-R applications on oceanographic observations under the contract with MEXT (Ministry of Education Culture, Sports, Science and Technology, JAPAN) and launched a Japanese research consortium, GROWTH (GNSS Reflectometry for Ocean Waves, Tides, and Height). It is aiming to evaluate the capabilities of GNSS-R observations for oceanographic phenomena with different time scales, such as ocean waves (1/10 to tens of seconds), tides (one or half days), and sea surface dynamic height (a few days to years). In situ observations of ocean wave spectrum, wind speed vertical profile, and sea surface height will be quantitatively compared with equivalent estimates from simultaneous GNSS-R measurements. The GROWTH project will utilize different types of observation platforms; marine observation towers (about 20 m height), multi-copters (about 100 to 150 m height), and much higher-altitude CYGNSS data. Cross-platform data, together with in situ oceanographic observations, will be compared after adequate temporal averaging that accounts differences of the footprint sizes and temporal and spatial scales of oceanographic phenomena. This paper will provide overview of the GROWTH project, preliminary test results, obtained by the multi-sensor platform at observation towers, suggest actual footprint sizes and identification of swell. Preparation status of a ground station which will be supplied to receive CYGNSS data

  17. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  18. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  19. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  20. Theory of Abelian projection

    International Nuclear Information System (INIS)

    Ogilvie, M.C.

    1999-01-01

    Analytic methods for Abelian projection are developed. A number of results are obtained related to string tension measurements. It is proven that even without gauge fixing, Abelian projection yields string tensions of the underlying non-Abelian theory. Strong arguments are given for similar results in the case where gauge fixing is employed. The methods used emphasize that the projected theory is derived from the underlying non-Abelian theory rather than vice versa. In general, the choice of subgroup used for projection is not very important, and need not be Abelian. While gauge fixing is shown to be in principle unnecessary for the success of Abelian projection, it is computationally advantageous for the same reasons that improved operators, e.g., the use of fat links, are advantageous in Wilson loop measurements. Two other issues, Casimir scaling and the conflict between projection and critical universality, are also discussed. copyright 1999 The American Physical Society

  1. Battleground Energy Recovery Project

    Energy Technology Data Exchange (ETDEWEB)

    Bullock, Daniel [USDOE Gulf Coast Clean Energy Application Center, Woodlands, TX (United States)

    2011-12-31

    In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

  2. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  3. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  4. AAEC nuclear power projections

    International Nuclear Information System (INIS)

    Khoe, G.; Fredsall, J.; Scurr, I.; Plotnikoff, W.

    1981-01-01

    The nuclear power capacity projections developed in the May-June period of 1981 by the AAEC are presented. There have been downward revisions for nearly all countries with centrally planned economies. Projections for the year 2000 for the Western World have decreased in aggregate by 4.7% (27Gw) compared to those of 1980. However, this reduction is less than the previous estimate reduction and there appears to have been a stabilisation in the projection

  5. What is project finance?

    OpenAIRE

    João M. Pinto

    2017-01-01

    Project finance is the process of financing a specific economic unit that the sponsors create, in which creditors share much of the venture’s business risk and funding is obtained strictly for the project itself. Project finance creates value by reducing the costs of funding, maintaining the sponsors financial flexibility, increasing the leverage ratios, avoiding contamination risk, reducing corporate taxes, improving risk management, and reducing the costs associated with market ...

  6. Computer Assets Recovery Project

    Science.gov (United States)

    CortesPena, Aida Yoguely

    2010-01-01

    This document reports on the project that was performed during the internship of the author. The project involved locating and recovering machines in various locations that Boeing has no need for, and therefore requires that they be transferred to another user or transferred to a non-profit organization. Other projects that the author performed was an inventory of toner and printers, loading new computers and connecting them to the network.

  7. Operational Waste Volume Projection

    Energy Technology Data Exchange (ETDEWEB)

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  8. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  9. Operational waste volume projection

    International Nuclear Information System (INIS)

    Koreski, G.M.; Strode, J.N.

    1995-06-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the tri-party agreement. Assumptions are current as of June 1995

  10. PPP projects in transport

    DEFF Research Database (Denmark)

    Petersen, Ole Helby; Carpintero, Samuel

    2014-01-01

    Public–private partnerships (PPPs) have been extensively used in Spain for the procurement of light rail systems. This paper analyses five projects that have been in operation for more than five years. The authors examine the reasoning behind the selection of the PPP projects, risk......-sharing mechanisms, competition among private providers, and overall cost-effectiveness. The paper demonstrates a need for more rigorous assessments of the merits of PPP projects before they are initiated....

  11. Operational Waste Volume Projection

    International Nuclear Information System (INIS)

    STRODE, J.N.

    2000-01-01

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000

  12. Existence of Projective Planes

    OpenAIRE

    Perrott, Xander

    2016-01-01

    This report gives an overview of the history of finite projective planes and their properties before going on to outline the proof that no projective plane of order 10 exists. The report also investigates the search carried out by MacWilliams, Sloane and Thompson in 1970 [12] and confirms their result by providing independent verification that there is no vector of weight 15 in the code generated by the projective plane of order 10.

  13. Microwave solidification project overview

    Energy Technology Data Exchange (ETDEWEB)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  14. Oskarshamn 1-project FENIX

    International Nuclear Information System (INIS)

    Sjoeqvist, N.G.

    1994-01-01

    This paper summarizes the actions to be taken in a large re-start and backfitting project such as the Fenix project. It describes the organization, planning and financial management, safety criteria and licensing procedures, safety concept report, health and safety. The results from the unique full system decontamination of the reactor pressure vessel is described. The project is still ongoing and therefore other results and lessons learnt are not reported. (author) 9 figs

  15. Microwave solidification project overview

    International Nuclear Information System (INIS)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included

  16. Embedded Linux projects using Yocto project cookbook

    CERN Document Server

    González, Alex

    2015-01-01

    If you are an embedded developer learning about embedded Linux with some experience with the Yocto project, this book is the ideal way to become proficient and broaden your knowledge with examples that are immediately applicable to your embedded developments. Experienced embedded Yocto developers will find new insight into working methodologies and ARM specific development competence.

  17. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  18. HERMES project management I

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    A two-hours course on the HERMES Project Management Methodology to the attention of Project Leaders and Project Participants. The methodology is quickly presented; the focus is put on the roles and responsibilities and on the project initiation phase. The course is given in French with slides in English. On April 22nd 2013, a new version of the HERMES methodology was made public. For practical reasons, this course is still given based on the 2009 version of HERMES (a.k.a. HERMES 4).

  19. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  20. Severe fuel damage projects

    International Nuclear Information System (INIS)

    Sdouz, G.

    1987-10-01

    After the descriptions of the generation of a Severe Fuel Damage Accident in a LWR the hypothetical course of such an accident is explained. Then the most significant projects are described. At each project the experimental facility, the most important results and the concluding models and codes are discussed. The selection of the projects is concentrated on the German Projekt Nukleare Sicherheit (PNS), tests performed at the Idaho National Engineering Laboratory (INEL) and smaller projects in France and Great Britain. 25 refs., 26 figs. (Author)

  1. Assessment of Students Projects

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Stachowicz, Marian S.

    2012-01-01

    The evaluation and assessment of engineering programmes is a big issue, and there exist many concepts and methods. This paper deals with the assessment methods which can be used when assessing the knowledge, skills and competences developed in projects using PBL (problem based and project organized...... learning) pedagogical approaches. The experience of assessing first year projects from the Medialogy education at Aalborg University and third year projects from the Electrical and Computer Engineering Department at University of Minnesota, Duluth are presented, and the different methods discussed....... The conclusion is that process as well as product has to be assessed in a way which evaluates all aspects of students’ learning outcomes....

  2. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  3. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  4. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  5. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  6. Sustainable Energy (SUSEN) project

    International Nuclear Information System (INIS)

    Richter, Jiri

    2012-01-01

    Research Centre Rez and University of West Bohemia started preparatory work on the 'Sustainable Energy' project, financed from EU structural funds. The goals and expected results of the project, its organization, estimated costs, time schedule and current status are described. (orig.)

  7. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  8. The Cool Colors Project

    Science.gov (United States)

    Gov. Arnold Schwarzenegger, second from left, a sample from the Cool Colors Project, a roof product ) (Jeff Chiu - AP) more Cool Colors make the front page of The Sacramento Bee (3rd highest circulation newspaper in California) on 14 August 2006! Read the article online or as a PDF. The Cool Colors Project

  9. Lower Churchill project

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, B. [Nalcor Energy, St. John' s, Newfoundland (Canada)

    2011-07-01

    This paper discusses the Lower Churchill Hydroelectric Generation Project in Newfoundland Labrador. The project is of national interest as it creates jobs and benefits across Canada. It provides inter provincial electricity grid integration, provides significant contribution to lower emissions and enables development of other renewable generation.

  10. Poverty alleviation project review

    CSIR Research Space (South Africa)

    Braun, AL

    2003-01-01

    Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...

  11. Conservation Science Fair Projects.

    Science.gov (United States)

    Soil Conservation Society of America, Ankeny, IA.

    Included are ideas, suggestions, and examples for selecting and designing conservation science projects. Over 70 possible conservation subject areas are presented with suggested projects. References are cited with each of these subject areas, and a separate list of annotated references is included. The references pertain to general subject…

  12. The ANTARES project

    International Nuclear Information System (INIS)

    Amram, Ph.; Anvar, S.; Aslanides, E.; Aubert, J.J.; Azoulay, R.; Basa, S.; Benhammou, Y.; Bernard, F.; Berthier, R.; Bertin, V.; Billault, M.; Biller, S.; Blanc, F.; Blanc, P.E.; Bland, R.W.; Blondeau, F.; Botton, N. de; Bottu, N.; Boulesteix, J.; Brooks, B.; Brunner, J.; Calzas, A.; Carloganu, C.; Carr, J.; Carton, P.H.; Cartwright, S.; Cases, R.; Cassol, F.; Charles, F.; Charles, J.; Desages, F.; Destelle, J.J.; Dispau, G.; Duval, P.Y.; Engelen, J.; Feinstein, F.; Flores, E.C.; Fopma, J.; Fuda, J.L.; Goret, P.; Gosset, L.; Gournay, J.F.; Hernandez, J.J.; Hubaut, F.; Hubbard, R.; Huss, D.; Jaquet, M.; Jelley, N.; Kajfasz, E.; Kouchner, A.; Kudryavtsev, V.; Lachartre, D.; Lafoux, H.; Lamare, P.; Languillat, J.C.; Laugier, J.P.; Le Provost, H.; Loiseau, D.; Loucatos, S.; Magnier, P.; Marc, K.; Marcelin, M.; Martin, L.; Mazeau, B.; Mazure, A.; McMillan, J.; Meessen, C.; Millot, C.; Mols, P.; Montanet, F.; Moorhead, M.; Moscoso, L.; Navas, S.; Nooren, Van; Olivetto, C.; Palanque-Delabrouille, N.; Pallares, A.; Payre, P.; Perrin, P.; Poinsignon, J.; Potheau, R.; Qian, Z.; Raymond, M.; Roberts, J.; Sacquin, Y.; Schuller, J.P; Schuster, W.; Spooner, N.; Stolarczyk, T.; Tabary, A.; Talby, M; Tao, C.; Thompson, L.; Triay, R.; Valdy, M.; Velasco, J.; Vigeolas, E.; Vignaud, D.; Vilanova, D.; Wark, D.; Zuniga, J.

    1999-01-01

    The ANTARES project is an international collaboration with the aim of building a deep-sea large area neutrino telescope within the next decade. The achievements and status of the project as at the time of the conference are briefly discussed, and short term steps as well as longer term plans are described

  13. The Comic Book Project

    Science.gov (United States)

    Bitz, Michael

    2008-01-01

    The Comic Book Project (CBP) celebrates its eighth anniversary this year. The project, which just originated with one school in New York City, had grown to encompass thousands of students nationwide. The goal of the CBP is not to create comics the "Marvel way" or to develop the next Stan Lee. Rather, the goal is to give students the opportunity to…

  14. Project Identification and Formulation

    DEFF Research Database (Denmark)

    Lund, Søren; Lønholdt, Jens

    2005-01-01

    Provides the necessary conceptual framework and tools to assess all appropriate aspects of water and sanitation projects in developing countries. Appeals to graduate environmental engineering students, practitioners, economists, sociologists, and institutional planners working with water...... and sanitation projects in developing countries....

  15. Climate projections FAQ

    Science.gov (United States)

    A.E. Daniels; J.F. Morrison; L.A. Joyce; N.L. Crookston; S.C. Chen; S.G. McNulty

    2012-01-01

    Climate scenarios offer one way to identify and examine the land management challenges posed by climate change. Selecting projections, however, requires careful consideration of the natural resources under study, and where and how they are sensitive to climate. Selection also depends on the robustness of different projections for the resources and geographic area of...

  16. Plant Biology Science Projects.

    Science.gov (United States)

    Hershey, David R.

    This book contains science projects about seed plants that deal with plant physiology, plant ecology, and plant agriculture. Each of the projects includes a step-by-step experiment followed by suggestions for further investigations. Chapters include: (1) "Bean Seed Imbibition"; (2) "Germination Percentages of Different Types of Seeds"; (3)…

  17. Private Water Projects

    OpenAIRE

    Izaguirre, Ada Karina; Hunt, Catherine

    2005-01-01

    Drawing on the World Bank's Private Participation in Infrastructure Project Database, this Note reviews developments in the water and sewerage sector of developing countries in 2004 and changes in private participation in the sector since 2001. Data for 2004 show that total investment in water and sewerage projects with private participation amounted to nearly US$2 billion. Recent private ...

  18. Classifying IS Project Problems

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2006-01-01

    The literature contains many lists of IS project problems, often in the form of risk factors. The problems sometimes appear unordered and overlapping, which reduces their usefulness to practitioners as well as theoreticians. This paper proposes a list of criteria for formulating project problems...

  19. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  20. Financing landfill gas projects

    International Nuclear Information System (INIS)

    Bull, R.

    1992-01-01

    The problems of financing landfill gas projects in the UK in the last few years are discussed. The approach of the author in setting up a company to finance such projects in the power generation field and a separate company to design and supply turnkey packages is reported. (UK)

  1. The Nordwrite Project.

    Science.gov (United States)

    Evensen, Lars, Sigfred

    A planned 3-year joint project of the Nordic research council for the humanities that focuses on writing development in school-age children is described. Four Nordic countries are involved in the project: Finland, Sweden, Norway, and Denmark. In the study, discourse-level performance analyses of student writing in English as a Second Language are…

  2. The Okapi Projects.

    Science.gov (United States)

    Keen, Michael

    1997-01-01

    Examines general issues in conducting information retrieval research. Topics include the Okapi information retrieval system and its probabilistic model; the Cranfield projects, concerning recall and precision; the SMART project with its vector-space model; evaluation methodology, including laboratory evaluation of interactive systems; and…

  3. The TULIP Project.

    Science.gov (United States)

    Gusack, Nancy, Ed.; And Others

    1995-01-01

    Contains 11 articles that describe different university access systems designed and built to provide access to journals via The University Licensing Program (TULIP), a science journal access project, involving Elsevier Science Publishing and major universities. The project produced insights to help with future electronic information delivery…

  4. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  5. Solar renovation demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Bruun Joergensen, O [ed.

    1998-10-01

    In the framework of the IEA SHC Programme, a Task on building renovation was initiated, `Task 20, Solar Energy in Building Renovation`. In a part of the task, Subtask C `Design of Solar Renovation Projects`, different solar renovation demonstration projects were developed. The objective of Subtask C was to demonstrate the application of advanced solar renovation concepts on real buildings. This report documents 16 different solar renovation demonstration projects including the design processes of the projects. The projects include the renovation of houses, schools, laboratories, and factories. Several solar techniques were used: building integrated solar collectors, glazed balconies, ventilated solar walls, transparent insulation, second skin facades, daylight elements and photovoltaic systems. These techniques are used in several simple as well as more complex system designs. (au)

  6. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  7. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  8. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  9. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  10. Bioenergy/Biotechnology projects

    Energy Technology Data Exchange (ETDEWEB)

    Napper, Stan [Louisiana Tech Univ., Ruston, LA (United States); Palmer, James [Louisiana Tech Univ., Ruston, LA (United States); Wilson, Chester [Louisiana Tech Univ., Ruston, LA (United States); Guilbeau, Eric [Louisiana Tech Univ., Ruston, LA (United States); Allouche, Erez [Louisiana Tech Univ., Ruston, LA (United States)

    2012-06-30

    This report describes the progress of five different projects. The first is an enzyme immobilization study of cellulase to reduce costs of the cellulosic ethanol process. High reusability and use of substrates applicable to large scale production were focus areas for this study. The second project was the development of nanostructured catalysts for conversion of syngas to diesel. Cobalt nanowire catalyst was used in Fischer-Tropsch synthesis. The third project describes work on developing a microfluidic calorimeter to measure reaction rates of enzymes. The fourth project uses inorganic polymer binders that have the advantage of a lower carbon footprint than Portland cement while also providing excellent performance in elevated temperature, high corrosion resistance, high compressive and tensile strengths, and rapid strength gains. The fifth project investigates the potential of turbines in drop structures (such as sewer lines in tall buildings) to recover energy.

  11. projecting pARTicles, a STEAM project

    CERN Document Server

    Goldfarb, Steven; The ATLAS collaboration

    2016-01-01

    Agnes Chavez is a media artist based in the US (New Mexico) and involved in STEM Art Labs. An informal partnership initiated with some ATLAS physicists will develop further in 2016 through a series of workshops where Virtual Visits, Master Class material and the presence of a physicist will be gradually integrated. The project can be seen as an illustration of constructive and long term collaboration between artists, students and scientists.

  12. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  13. Use of reference buildings to assess the energy saving potentials of the residential building stock: The experience of TABULA project

    International Nuclear Information System (INIS)

    Ballarini, Ilaria; Corgnati, Stefano Paolo; Corrado, Vincenzo

    2014-01-01

    Retrofit actions applied to the existent building stock aim at increasing the energy performance, considering the optimal trade-off between energy savings and costs, according to the Directive 2010/31/EU. To select effective refurbishment measures and to quantify the energy saving potentials of the existent building stock, the analysis should be performed on “reference buildings”. This article presents a methodology for the identification of reference buildings, according to the IEE-TABULA project (2009–12) aimed at creating a harmonised structure for “European Building Typologies”. Among the possible applications of the building typology, this work focuses on the potentialities of energy savings and CO 2 emission reductions for the European residential building stock. In particular, the Italian approach to model the energy balance of a subset of the national building stock is described; the results show the enormous potentialities of energy savings even with basic energy retrofit actions. Cost analyses were not in the scope of the project, but the results of this study are the basis for further investigations aimed at assessing the cost effectiveness of sets of measures. In this regard, the TABULA building-types are being applied by the Italian government for calculating cost-optimal levels of energy performance, complying with the Directive 2010/31/EU objectives. - Highlights: • European building stocks need retrofit actions to improve the energy performance. • Necessity to define “reference buildings” in order to perform cost-optimal analyses. • Definition of a National “Building Typology” according to IEE-TABULA project. • Methodology to identify reference buildings for assessing energy saving potentials

  14. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  15. Improving Project Manufacturing Coordination

    Directory of Open Access Journals (Sweden)

    Korpivaara Ville

    2014-09-01

    Full Text Available The objective of this research is to develop firms’ project manufacturing coordination. The development will be made by centralizing the manufacturing information flows in one system. To be able to centralize information, a deep user need assessment is required. After user needs have been identified, the existing system will be developed to match these needs. The theoretical background is achieved through exploring the literature of project manufacturing, development project success factors and different frameworks and tools for development project execution. The focus of this research is rather in customer need assessment than in system’s technical expertise. To ensure the deep understanding of customer needs this study is executed by action research method. As a result of this research the information system for project manufacturing coordination was developed to respond revealed needs of the stakeholders. The new system improves the quality of the manufacturing information, eliminates waste in manufacturing coordination processes and offers a better visibility to the project manufacturing. Hence it provides a solid base for the further development of project manufacturing.

  16. Projected coupled cluster theory.

    Science.gov (United States)

    Qiu, Yiheng; Henderson, Thomas M; Zhao, Jinmo; Scuseria, Gustavo E

    2017-08-14

    Coupled cluster theory is the method of choice for weakly correlated systems. But in the strongly correlated regime, it faces a symmetry dilemma, where it either completely fails to describe the system or has to artificially break certain symmetries. On the other hand, projected Hartree-Fock theory captures the essential physics of many kinds of strong correlations via symmetry breaking and restoration. In this work, we combine and try to retain the merits of these two methods by applying symmetry projection to broken symmetry coupled cluster wave functions. The non-orthogonal nature of states resulting from the application of symmetry projection operators furnishes particle-hole excitations to all orders, thus creating an obstacle for the exact evaluation of overlaps. Here we provide a solution via a disentanglement framework theory that can be approximated rigorously and systematically. Results of projected coupled cluster theory are presented for molecules and the Hubbard model, showing that spin projection significantly improves unrestricted coupled cluster theory while restoring good quantum numbers. The energy of projected coupled cluster theory reduces to the unprojected one in the thermodynamic limit, albeit at a much slower rate than projected Hartree-Fock.

  17. RCA's regional industrial project

    International Nuclear Information System (INIS)

    Ali, A.T.

    1988-01-01

    The Regional Cooperation Agreement (RCA) for Research Development and Training Related to Nuclear Science and Technology, formulated under the auspices of the International Atomic Energy Agency (IAEA), came into force in June 1972. The overall objective of RCA is to promote technical cooperation among the developing and developed countries in the Asia Pacific region in the peaceful uses of nuclear energy and related technology. Currently, the biggest project under RCA is the Regional Project on the Industrial Applications of Isotopes and Radiation Technology for Asia and the Pacific. The project was established in 1982 for a period of five years and was completed in December 1986. The first phase of the project has generated a high degree of awareness on the industrial potential of isotopes and radiation technology throughout the region; produced a cadre of trained manpower in all areas covered by the project; identified the expertise available in the region; and developed in the region, a unique network of people and institutions involved with the utilization of isotope and radiation technology. A Phase II of the project, which cover all but one of the sub-projects under Phase I, was approved in early 1987 for another five years until 1991. (Nogami, K.)

  18. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  19. Replacement/Refurbishment of JSC/NASA POD Specimens

    Science.gov (United States)

    Castner, Willard L.

    2010-01-01

    The NASA Special NDE certification process requires demonstration of NDE capability by test per NASA-STD-5009. This test is performed with fatigue cracked specimens containing very small cracks. The certification test results are usually based on binomial statistics and must meet a 90/95 Probability of Detection (POD). The assumption is that fatigue cracks are tightly closed, difficult to detect, and inspectors and processes passing such a test are well qualified for inspecting NASA fracture critical hardware. The JSC NDE laboratory has what may be the largest inventory that exists of such fatigue cracked NDE demonstration specimens. These specimens were produced by the hundreds in the late 1980s and early 1990s. None have been produced since that time and the condition and usability of the specimens are questionable.

  20. Refurbishment of the power supply and NMR systems

    International Nuclear Information System (INIS)

    Dugay, G.

    1998-01-01

    This paper summarises some of the first renovation performed on GANIL power converters, their control system and on magnetic field measurements. Among numerous actions undertaken the most important four, mentioned in the report are: remote control interfaces; current catchers; pulsed supplies; RMN system renovation