  1. Outages planning

    International Nuclear Information System (INIS)

    Blanquer, N.

    2010-01-01

    The reason of a nuclear power plant outage seems easy. Replace 1/3 of the total core fuel inside reactor for a new, store the old one in a pool and shuffle the rest 2/3 in other positions in the core to optimize fuel burn up. Also is needed to make the preventive, corrective and conservative maintenance, the selected design changes and the regulatory and technical requirements for equipment and systems. To make the plant outage strategy for all the above pack with nuclear safety not challenged is the objective of this article for the Spanish Nuclear Society magazine. (Author)

  2. Outage planning in Japan

    International Nuclear Information System (INIS)

    Nedderman, John.

    1997-01-01

    Nuclear plant operators in Japan are constrained to keep refuelling and maintenance outages to a minimum by the regulation limiting operating cycles to no longer than 13 months. Outage planning by two contrasting operators is described. Hokkaido Electric, which operates only one plant, Tomari, with two PWRs, plans to reduce outage time from the present 65 days in two stages. Detailed review of previous outage schedules has shown that a reduction to 59 days should be achievable by careful planning without any fundamental changes. The second reduction to 49 days will require such measures as relaxing water purity standards, rescheduling fuel unloading and loading shifts and speeding up eddy current testing of primary equipment by using steam generator nozzle dams. Kansai Electric, operating 11 PWRs at three plants, has scope for reducing outages at all of its units using a range of measures. Steam generator replacement in the seven oldest reactors, completed in July 1997, is by far the most significant of these and is expected to save 64 days repair time in a previous average outage time of 131 days. (UK)

  3. Outage preparation milestones - A tool to improve planned outage performance

    International Nuclear Information System (INIS)

    Laplatney, Jere; Hwang, Euiyoub

    2006-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depend heavily on the performance of planned outages. Nuclear Power Plants who have successfully undertaken outage optimization projects have demonstrated than an effective Outage Preparation Milestone program is a key component of their improvement programs. This paper will provide background into the field of 'Outage Optimization' including the philosophy, general approach, and results obtained in the U. S. industry. The significant safety improvements afforded by properly implementing outage improvement programs will be explained. Some specific examples of outage improvements will be given including the adoption of a strong Outage Preparation Milestone Program. The paper will then describe the attributes of an effective Outage Preparation Milestone Program and list a set of specific key milestones. The key milestones are defined and the reasons for each are explained. Suggested due dates for each key milestone relative to the outage start date are provided. Successful implementation of an Outage Preparation Milestone program depends heavily upon the management tools and methods used to assure that the organization meets the milestones on time and in a quality fashion. These include methods to handle cases where milestones are not met - either partially or fully. KHNP is investigating implementing an improved Outage Preparation Milestone program for its fleet of reactors as part of its overall program to improve its performance of planned outages

  4. Management of planned unit outages

    International Nuclear Information System (INIS)

    Brune, W.

    1984-01-01

    Management of planned unit outages at the Bruno Leuschner Nuclear Power Plant is based on the experience gained with Soviet PWR units of the WWER type over a period of more than 50 reactor-years. For PWR units, planned outages concentrate almost exclusively on annual refuellings and major maintenance of the power plant facilities involved. Planning of such major maintenance work is based on a standardized basic network plan and a catalogue of standardized maintenance and inspection measures. From these, an overall maintenance schedule of the unit and partial process plans of the individual main components are derived (manually or by computer) and, in the temporal integration of major maintenance at every unit, fixed starting times and durations are determined. More than 75% of the maintenance work at the Bruno Leuschner Nuclear Power Plant is carried out by the plant's own maintenance personnel. Large-scale maintenance of every unit is controlled by a special project head. He is assisted by commissioners, each of whom is responsible for his own respective item. A daily control report is made. The organizational centre is a central office which works in shifts around the clock. All maintenance orders and reports of completion pass through this office; thus, the overall maintenance schedule can be corrected daily. To enforce the proposed operational strategy, suitable accompanying technical measures are required with respect to effective facility monitoring and technical diagnosis, purposeful improvement of particularly sensitive components and an increase in the effectiveness of maintenance work by special technologies and devices. (author)

  5. Outages planning; Planificacion de recargas

    Energy Technology Data Exchange (ETDEWEB)

    Blanquer, N.

    2010-07-01

    The reason of a nuclear power plant outage seems easy. Replace 1/3 of the total core fuel inside reactor for a new, store the old one in a pool and shuffle the rest 2/3 in other positions in the core to optimize fuel burn up. Also is needed to make the preventive, corrective and conservative maintenance, the selected design changes and the regulatory and technical requirements for equipment and systems. To make the plant outage strategy for all the above pack with nuclear safety not challenged is the objective of this article for the Spanish Nuclear Society magazine. (Author)

  6. Energy markets : refinery outages can have varying gasoline price impacts, but gaps in federal data limit understanding of impacts.

    Science.gov (United States)

    2009-07-01

    In 2008, GAO reported that, with : the exception of the period : following Hurricanes Katrina and : Rita, refinery outages in the United : States did not show discernible : trends in reduced production : capacity, frequency, and location : from 2002 ...

  7. Excellence through outage planning and scheduling

    International Nuclear Information System (INIS)

    Ferriole, G.

    1987-01-01

    The Nuclear and Fossil Generation Division of Electricite de France (EdF) has been the largest nuclear plant operating utility in France since 1984. The size of the units, their standardization, and extensive operating experience were favorable parameters leading to the development of a very complete maintenance organization. Electricite de France believes in the importance of well-defined maintenance concepts. These maintenance concepts contribute to outage performance by requiring a careful consideration of work to be done and by defining the techniques and means of accomplishing this work. In addition to maintenance concepts and careful planning and scheduling, good outage management is achieved through the motivation and dedication of the people involved. It is the key to good operational results

  8. Indicators for management of planned outages in nuclear power plants

    International Nuclear Information System (INIS)

    2006-04-01

    The outages considered within the scope of this publication are planned refuelling outages (PWR and BWR nuclear power plants) and planned outages associated with major maintenance, tests and inspections (PHWR and LWGR nuclear power plants). The IAEA has published some valuable reports providing guidance and assistance to operating organizations on outage management. This TECDOC outlines main issues to be considered in outage performance monitoring and provides guidance to operating organizations for the development and implementation of outage programmes which could enhance plant safety, reliability and economics. It also complements the series of reports published by the IAEA on outage management and on previous work related to performance indicators developed for monitoring different areas of plant operation, such as safety, production, reliability and economics. This publication is based upon the information presented at a technical meeting to develop a standardized set of outage indicators for outage optimization, which was organised in Vienna, 6-9 October 2003. At this meeting, case studies and good practices relating to performance indicator utilization in the process of planned outage management were presented and discussed

  9. Evaluation of the Planned Outage Durations in EU-APR

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Byung Joon; Lee, Keun Sung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    EU-APR has been designed to comply with European Utility Requirements (EUR) and nuclear design requirements of the European countries. And it is modified and improved from its original design of APR1400. The whole duration varies depending on items for additional process. Refueling and regular maintenance outage is comprised of basic processes and Main turbine-generator outage includes dismantling inspection of main generator and high pressure turbine as a critical path in addition to basic processes. In-Service Inspection Outage includes Automatic ultrasonic inspection on the upper side/lower side of a nuclear reactor as a critical path in addition to basic processes. The planned outage durations of EU-APR are optimized according to the above results. And they are complied with EUR Requirement (EUR 2.2.7.2.2 B), respectively. In addition, outage duration can be reduced with improved operating technology and more maintenance friendly environment including betterment of filling, drain and ventilation.

  10. Evaluation of the Planned Outage Durations in EU-APR

    International Nuclear Information System (INIS)

    Jung, Byung Joon; Lee, Keun Sung

    2016-01-01

    EU-APR has been designed to comply with European Utility Requirements (EUR) and nuclear design requirements of the European countries. And it is modified and improved from its original design of APR1400. The whole duration varies depending on items for additional process. Refueling and regular maintenance outage is comprised of basic processes and Main turbine-generator outage includes dismantling inspection of main generator and high pressure turbine as a critical path in addition to basic processes. In-Service Inspection Outage includes Automatic ultrasonic inspection on the upper side/lower side of a nuclear reactor as a critical path in addition to basic processes. The planned outage durations of EU-APR are optimized according to the above results. And they are complied with EUR Requirement (EUR 2.2.7.2.2 B), respectively. In addition, outage duration can be reduced with improved operating technology and more maintenance friendly environment including betterment of filling, drain and ventilation

  11. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  12. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  13. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  14. Saving doses by outage planning strategy and architectural arrangements

    International Nuclear Information System (INIS)

    Wahlstroem, B.

    1993-01-01

    All radiation doses come out as a result of dose rate and exposure time, and the main part of the occupational exposure is caused during outages. While every reasonable attempt should be made to lower the dose rates, the other factor, the exposure time, may not be forgotten. The paper presents possible ways of saving man-hours in the controlled zone by outage planning strategy. And every saved man-hour means a saved radiation dose. At Loviisa NPS also some special architectural arrangements contribute to shortening the outage time, thus saving doses

  15. Planning and management of outages in nuclear power plants

    International Nuclear Information System (INIS)

    Sica, G.F.; Fusari, W.; Reginelli, A.

    1984-01-01

    At present the Ente Nazionale per l'Energia Elettrica (ENEL) operates three nuclear power plants, only one of which belongs to the new generation, i.e. the Caorso Nuclear Power Plant which has been in commercial operation since December 1981. Outage planning, implementation and analysis are very important in order to minimize the shutdown time and thus improve plant availability, which is of particular importance for a large nuclear power plant. Such activities are very complicated because of the large number of jobs that have to be performed in accordance with detailed written procedures and which have to be properly documented and controlled. Large off-site resources are required which have to be accurately interfaced with on-site staff. The ENEL is making a great effort to define both the administrative and technical aspects of refuelling outages. As outage planning requires the availability and handling of a large amount of data and information, a maintenance information system that has been widely used in conventional plants was applied, with some modifications made especially for the Caorso Nuclear Power Plant. After two years the following results have been achieved: a large number of raw and processed data are now available, the first refuelling outage was carried out with few problems and according to schedule, and the second refuelling outage, based on the experience of the first, required somewhat less preparation and is developing well even though many special activities have had to be scheduled. The ENEL believes that the efforts made in the planning and management areas will pay off in terms of the short duration, smoothness and economy of further outages, both for Caorso and for future plants. (author)

  16. Primary Water Chemistry Control during a Planned Outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, Guoping; Nashiem, Rod; Matheson, Shane; Yabar, Berman; Harper, Bill; Roberts, John G.

    2012-09-01

    Bruce Power has developed a comprehensive outage water chemistry program, which includes both primary and secondary chemistry requirements during planned outages. The purpose of the program is to emphasize the chemistry requirements during outages and subsequent start-ups in order to maintain the integrity of the systems, minimise activity transport and radiation fields, reduce the Carbon-14 release, and to ensure that the requirements are integrated with the outage management program. Prior to a planned outage, Station Chemical Technical Sections identify outage chemistry requirements to Operations and Outage Planning and ensure that work necessary to correct system chemistry issues is within outage work scope. The outage water chemistry program provides direction for establishing alternative sampling locations as demanded by the system configuration during the outage and identifies outage prerequisites for nuclear system purification capabilities. These requirements are contained in an outage checklist. The paper mainly highlights the primary water chemistry issues and chemistry control strategies during planned outages and discusses challenges and successes. (authors)

  17. ALARA database value in future outage work planning and dose management

    International Nuclear Information System (INIS)

    Miller, D.W.; Green, W.H.

    1995-01-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system's ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed

  18. ALARA database value in future outage work planning and dose management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.W.; Green, W.H. [Clinton Power Station Illinois Power Co., IL (United States)

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.

  19. Operational planning of refineries; Planejamento operacional de refinarias

    Energy Technology Data Exchange (ETDEWEB)

    Sinay, Maria Cristina Fogliatti de [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil); Bueno, Catia [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The activities integration that compose the petroleum logistic chain makes more complex its planning which is normally done in a joined level, using operation research models in order to find optimized solutions. When this integrated planning is repassed to the companies and its constitutes parts (mainly refinery) uncertainness are generated about the solution that will be adopted in case of new restrictions appear. Then, the purpose of this work is propose a procedure that is capable to adequate and specifies optimized solutions presented by corporative model to refinery operations, using 'What-if' and deterministic simulation technique with optimization. To achieve this objective will be analysed typical activities in refineries and basic principles to their operational planning. (author)

  20. Planning and scheduling for petroleum refineries using mathematical programming

    Directory of Open Access Journals (Sweden)

    Joly M.

    2002-01-01

    Full Text Available The objective of this paper is the development and solution of nonlinear and mixed-integer (MIP optimization models for real-world planning and scheduling problems in petroleum refineries. Firstly, we present a nonlinear planning model that represents a general refinery topology and allows implementation of nonlinear process models as well as blending relations. The optimization model is able to define new operating points, thus increasing the production of the more valuable products and simultaneously satisfying all specification constraints. The second part addresses scheduling problems in oil refineries, which are formulated as MIP optimization models and rely on both continuous and discrete time representations. Three practical applications closely related to the current refinery scenario are presented. The first one addresses the problem of crude oil inventory management of a refinery that receives several types of crude oil delivered exclusively by a single oil pipeline. Subsequently, two optimization models intended to define the optimal production policy, inventory control and distribution are proposed and solved for the fuel oil and asphalt plant. Finally, the planning model of Moro et al. (1998 is extended in order to sequence decisions at the scheduling level in the liquefied petroleum gas (LPG area for maximization of the production of petrochemical-grade propane and product delivery.

  1. Application of PIMS Software in Monthly Planning of Refinery Production

    Institute of Scientific and Technical Information of China (English)

    2005-01-01

    This article describes the application of the PIMS software in formulating monthly refining production plan. Application of the PIMS software can help to solve a series of problems related with monthly plan of refining production such as optimized selection of crude and feedstocks, optimized selection of production scale and processing scheme, identification of bottlenecks and their mitigation,optimized selection of turnaround time and optimized selection of operating regime, which have increased the economic benefits of refining enterprises. With the further development and improvement of models the PIMS software will play an increasingly important role in formulating monthly plans of refining operations and production management at refineries. This article also explores the problems existing in refinery monthly planning, and has made recommendations on developing and improving models and reporting system, enhancement of basic data acquisition, model maintenance personnel and staff training.

  2. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GIS) mbH, Weinheim (Germany)

    2014-07-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  3. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)

  4. Refinery production planning and scheduling: the refining core business

    Directory of Open Access Journals (Sweden)

    M. Joly

    2012-06-01

    Full Text Available Intelligent production planning and scheduling are of paramount importance to ensure refinery profitability, logistic reliability and safety at the local and corporate levels. In Brazil, such activities play a particularly critical role, since the Brazilian downstream model is moving towards a demand-driven model rather than a supply-driven one. Moreover, new and specialized non-linear constraints are continuously being incorporated into these large-scale problems: increases in oil prices implying the need for processing poor quality crudes, increasing demand and new demand patterns for petroleum products, new stringent environmental regulations related to clean fuels and start-up of new production technologies embedded into more complex refining schemes. This paper aims at clarifying the central role of refinery planning and scheduling activities in the Petrobras refining business. Major past and present results are outlined and corporate long-term strategies to deal with present and future challenges are presented.

  5. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    Energy Technology Data Exchange (ETDEWEB)

    Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)

    2014-05-15

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  6. Outage planning in nuclear power plants. A paradigm shift from an external towards an integrated project planning tool

    International Nuclear Information System (INIS)

    Rosemann, Andreas

    2014-01-01

    In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)

  7. Study on optimization of normal plant outage work plan for nuclear power plants

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Kodama, Noriko; Takase, Kentaro; Miya, Kenzo

    2011-01-01

    This paper discusses maintenance optimization in maintenance implementation stage following maintenance planning stage in nuclear power plants and proposes a methodology to get an optimum maintenance work plan. As a result of consideration, the followings were obtained. (1) The quantitative evaluation methodology for optimizing maintenance work plan in nuclear power plants was developed. (2) Utilizing the above methodology, a simulation analysis of maintenance work planning for BWR's PLR and RHR systems in a normal plant outage was performed. Maintenance cost calculation in several cases was carried out on the condition of smoothening man loading over the plant outage schedule as much as possible. (3) As a result of the simulation, the economical work plans having a flat man loading over the plant outage schedule were obtained. (author)

  8. Lessons learned in planning ALARA/health physics support for major nuclear power plant outages

    International Nuclear Information System (INIS)

    Gilman, T.R.; Lesinski, M.L.

    1987-01-01

    Although as low as reasonably achievable (ALARA)/health physics is viewed as necessary support for nuclear power plant outage work, it can be the last area to which attention is given in preparing for a large-scope outage. Inadequate lead times cause last-minute preparations resulting in delays in planned work. The Dresden Unit 3 Recirculation Piping Replacement Project is examined from a planning viewpoint. The attention that was given the various areas of a comprehensive ALARA/health physics program is examined, and approximate recommended lead times are discussed. The discussion will follow a chronological path from project inception to the beginning stages of outage work. Initially, the scope of work needs to be assessed by individuals familiar with similar projects of equivalent magnitude. Those individuals need to be health physics professionals who understand the particular utility and/or the site's way of doing business. They should also possess a good understanding of preferred industry practices

  9. Driving for shorter outages

    International Nuclear Information System (INIS)

    Tritch, S.

    1996-01-01

    Nuclear plant outages are necessary to complete activities that cannot be completed during the operating cycle, such as steam generator inspection and testing, refueling, installing modifications, and performing maintenance tests. The time devoted to performing outages is normally the largest contributor to plant unavailability. Similarly, outage costs are a sizable portion of the total plant budget. The scope and quality of work done during outages directly affects operating reliability and the number of unplanned outages. Improved management and planning of outages enhances the margin of safety during the outage and results in increased plant reliability. The detailed planning and in-depth preparation that has become a necessity for driving shorter outage durations has also produced safer outages and improved post-outage reliability. Short outages require both plant and vendor management to focus on all aspects of the outage. Short outage durations, such as 26 days at South Texas or 29 days at North Anna, require power plant inter-department and intra-department teamwork and communication and vendor participation. In this paper shorter and safer outage at the 3-loop plants in the United States are explained. (J.P.N.)

  10. Using virtual reality technology for decommissioning and outage planning

    International Nuclear Information System (INIS)

    Lirvall, Peter

    1998-01-01

    The VR Decom. Tool is a decommissioning, planning, and training tool. It is not yet in use, but appropriate technology has been identified to develop such a tool The tool is intended to be used as an interactive virtual mock-up of a process plant to plan and practice decommissioning activities. The tool will be able to create or import existing CAD drawing to be visualised in an interactive Virtual Reality (VR) environment, with links to data bases containing useful information about all the process components for planning the decommissioning. The most use of the tool is foreseen to be in areas that have limited access, such as, radioactive or hazardous. The main advantages are summarised below: (1) virtual mock-up for visualisation of non-accessible areas to plan and provide training for decommissioning procedures, (2) visualisation of three dimensional radiation maps for As Low As Reasonably Achievable (A.L.A.R.A.) staff dose management, (3) raining of special tele-operations procedures, (4) special tools prototyping and testing, (5) information access and team vision sharing. (author)

  11. Proposed plan for the K-Area Bingham Pump Outage Pit (643-1G)

    International Nuclear Information System (INIS)

    Palmer, E.

    1997-06-01

    This Proposed Plan is issued by the U.S. Department of Energy (DOE), which functions as the lead agency for SRS remedial activities, and with concurrence by the U.S. Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC). The purpose of this Proposed Plan is to describe the preferred remedial alternative for addressing the K-Area Bingham Pump Outage Pit (643-1G) (K BPOP) located at the Savannah River Site (SRS) in Aiken, South Carolina and to solicit public comments on the preferred alternative

  12. Study on European Nuclear Safety Practices during Planned Outages at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2001-12-01

    The present project was aimed at providing: a description of the current status of nuclear safety practices during planned outages at nuclear power plants followed in Europe; the criteria for the safety analysis of future reactors at the design stage; proposing a set of recommendations on good practices and criteria leading to the improvement of nuclear safety during those conditions. The work was organised in 3 phases: Collecting data on current practices; Analysis of questionnaire answers and drawing up of safety good practices references and recommendations; Collecting relevant ideas related to the future reactors at design stage (European Pressurised Water Reactor, European Passive Plant project, European Utilities Requirements and Utilities Requirement Document project). The key element of the performed work was the detailed questionnaire, based on bibliographical review, expert experience and outage practices available in the working team. Different safety areas and activities were covered: outage context; nuclear safety; outage strategy, organisation and control; operating feedback; use of Probabilistic Safety Assessment. The questionnaire was answered by 12 European nuclear power plants, representing 9 different European countries and three different types of reactors (Pressurised Water Reactor, Boiling Water Reactor and Water Water Energy Reactor). Conclusions were drawn under the following headers: Organisational survey and generalities Organisational effectiveness Quality of maintenance Quality of operation Engineering support, management of modification Specific aspects Each analysed subject includes the following topics: Questions background with a summary and the aim of the questions. Current status, that describes common practices, as derived from the answers to the questionnaire, and some examples of good specific practices. Identified good practices. (author)

  13. Integrating planning and scheduling in an oil refinery with a rolling horizon approach

    NARCIS (Netherlands)

    Zondervan, E.; Kaland, M.; van Elzakker, M.A.H.; Fransoo, J.C.; Meuldijk, J.; Klemes, J.J.; Varbanov, P.S.; Liew, P.Y.

    2014-01-01

    Decisions in an oil refinery are made at three levels: planning, scheduling and control. Existing facilities have to be operated close to their maximum capacity, while continuously responding to cost fluctuations. In many of the currently reported planning models each decision level has its own

  14. Cycle 7 outage experience

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The scheduled 58-day refueling outage in preparation for the seventh operating cycle of the Fast Flux Test Facility (FFTF) was successfully completed three days ahead of schedule. The planning and execution of the outage was greatly aided by Project/2 automated scheduling capabilities. For example, the use of ''maintenance windows'' and resource loading capabilities was particularly effective. The value of the planning process was demonstrated by the smooth transition into the outage phase after an early shutdown and set the stage for our best outage to date

  15. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  16. Experience of oil in CANDU moderator during A831 planned outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, G.; Nashiem, R.; Matheson, S.; Stuart, C.; Roberts, J.G.

    2011-01-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  17. Experience of oil in CANDU® moderator during A831 planned outage at Bruce Power

    International Nuclear Information System (INIS)

    Ma, G.; Nashiem, R.; Matheson, S.; Stuart, C.; Roberts, J.G.

    2010-01-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU® reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  18. Experience of oil in CANDU® moderator during A831 planned outage at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Ma, G.; Nashiem, R.; Matheson, S. [Bruce Power, Tiverton, Ontario (Canada); Stuart, C. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Roberts, J.G. [CANTECH Associates Ltd., Burlington, Ontario (Canada)

    2010-07-01

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU® reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  19. Experience of oil in CANDU moderator during A831 planned outage at Bruce Power

    Energy Technology Data Exchange (ETDEWEB)

    Ma, G.; Nashiem, R.; Matheson, S. [Bruce Power, Tiverton, Ontario (Canada); Stuart, C. [Atomic Energy of Canada Limited, Chalk River, Ontario (Canada); Roberts, J.G. [CANTECH Associates Ltd., Burlington, Ontario (Canada)

    2011-03-15

    In their address to the Nuclear Plant Chemistry Conference 2009, Bruce Power staff will describe the effects of oil ingress to the moderator of a CANDU reactor. During the A831 planned outage of Bruce Power Unit 3, an incident of oil ingress into moderator was discovered on Oct 17, 2008. An investigation identified the cause of the oil ingress. Atomic Energy of Canada Ltd. (AECL) assessed operability of the reactor with the oil present and made recommendations with respect to the effect on unit start-up with oil present. The principal concern was the radiolytic generation of deuterium from the breakdown of the oil in-core. Various challenges were presented during start-up which were overcome via innovative approaches. The subsequent actions and consequential effects on moderator chemistry are discussed in this paper. Examination of the plant chemistry data revealed some interesting aspects of moderator system chemistry under upset conditions which will also be presented. (author)

  20. Scale models: A proven cost-effective tool for outage planning

    Energy Technology Data Exchange (ETDEWEB)

    Lee, R. [Commonwealth Edison Co., Morris, IL (United States); Segroves, R. [Sargent & Lundy, Chicago, IL (United States)

    1995-03-01

    As generation costs for operating nuclear stations have risen, more nuclear utilities have initiated efforts to improve cost effectiveness. Nuclear plant owners are also being challenged with lower radiation exposure limits and new revised radiation protection related regulations (10 CFR 20), which places further stress on their budgets. As source term reduction activities continue to lower radiation fields, reducing the amount of time spent in radiation fields becomes one of the most cost-effective ways of reducing radiation exposure. An effective approach for minimizing time spent in radiation areas is to use a physical scale model for worker orientation planning and monitoring maintenance, modifications, and outage activities. To meet the challenge of continued reduction in the annual cumulative radiation exposures, new cost-effective tools are required. One field-tested and proven tool is the physical scale model.

  1. Power Outages

    Science.gov (United States)

    ... Publications Emergency Alerts Preparedness Portal Preparedness Messaging Calendar Social Media Preparedness Toolkits Preparedness News Languages About Us Build a Kit Close Search Enter Search Term(s): Main Content Home Be Informed Power Outages Power Outages Extended power outages may impact ...

  2. Simultaneous optimization of planning and scheduling in an oil refinery

    NARCIS (Netherlands)

    Zondervan, E.; van Boekel, T.P.J.; Fransoo, J.C.; Haan, de A.B.; Postikopoulos, E.N.; Georgiadis, M.C.; Kokossis, A.

    2011-01-01

    In earlier work we have developed and tested a scheduling model [1] in the AIMMS software. In this follow-up contribution we will develop a planning model. Next we will identify the information flow between scheduling model and the planning model. Lastly we will integrate the two models in a

  3. Management techniques that keep outages on schedule

    International Nuclear Information System (INIS)

    Taylor, R.B.

    1987-01-01

    During the immature operation of the Pickering Units 5 through 8, significant numbers of outages have been required to deal with warranty inspections and equipment problems. Techniques have been developed to ensure that outages are properly planned and managed so that outage time is minimized, overtime is minimized, and capacity factor is maximized, while ensuring that personnel safety is not compromised. Successful outage planning and execution requires the commitment of many on-station and off-station resources groups. Coordination of all of these groups is required both before and during the outage to ensure outage time is not lost due to unavailability of men or equipment at the time they are required. This paper details the control processes that must be used prior to, during, and after an outage to ensure that time is not lost unnecessarily during outages. Successful outage management at Pickering Nuclear Generating Station can be subdivided into three stages; preoutage planning, outage execution, and postoutage review

  4. 35/30 outage improvement project

    International Nuclear Information System (INIS)

    Clewett, L.

    2011-01-01

    Outage performance is a significant contributor to the business plan at Bruce Power. A process improvement initiative commenced in 2010-11 to improve outage efficiency and predictability. 12 teams (over 200 people) participated in improvement identification in four areas: Organizational Engagement; Outage Scope; Resources; and, Critical Outage Execution. Out of over 550 initiatives identified, 200 are being incorporated into the Outage Improvement Initiative. Key deliverables include: Development of a long-range 'fleet-level' business strategy to integrate outage duration, outage improvements and unit refurbishments; Development of a 35 day outage schedule template; Determining optimal outage organization to perform outages on an 8-unit site; Improved schedule adherence and productivity; Process to integrate scope needs to support life-cycle and long-range outage needs improvement while meeting near term and regulatory requirements; Consistent methodology in planning of outages to front-end load the high risk work into the outage schedule; Consistent baseline by senior leaders for the expectations of milestone ownership and completion; Consistent framework for milestone compliance and preparation; Communication strategy to educate personnel on the importance of the outage program and nuclear safety, business goals, and budget; and, Suite of metrics based upon industry benchmarks. The Outage Improvement Initiative has a goal of 35 day outages every 30 months. This potentially represents considerable savings to the Bruce Power business plan, both direct revenue savings attributed to reduced outage duration, as well as incremental outage cost savings. Other improvements from the initiative will include personnel radiation exposure and equipment reliability due to decreased outage duration and adherence to scoping, assessing and long lead part milestones. This presentation will describe the outage improvement initiatives to achieve a goal of consistent 35 day outages

  5. 35/30 outage improvement project

    Energy Technology Data Exchange (ETDEWEB)

    Clewett, L. [Bruce Power, Tiverton, Ontario (Canada)

    2011-07-01

    Outage performance is a significant contributor to the business plan at Bruce Power. A process improvement initiative commenced in 2010-11 to improve outage efficiency and predictability. 12 teams (over 200 people) participated in improvement identification in four areas: Organizational Engagement; Outage Scope; Resources; and, Critical Outage Execution. Out of over 550 initiatives identified, 200 are being incorporated into the Outage Improvement Initiative. Key deliverables include: Development of a long-range 'fleet-level' business strategy to integrate outage duration, outage improvements and unit refurbishments; Development of a 35 day outage schedule template; Determining optimal outage organization to perform outages on an 8-unit site; Improved schedule adherence and productivity; Process to integrate scope needs to support life-cycle and long-range outage needs improvement while meeting near term and regulatory requirements; Consistent methodology in planning of outages to front-end load the high risk work into the outage schedule; Consistent baseline by senior leaders for the expectations of milestone ownership and completion; Consistent framework for milestone compliance and preparation; Communication strategy to educate personnel on the importance of the outage program and nuclear safety, business goals, and budget; and, Suite of metrics based upon industry benchmarks. The Outage Improvement Initiative has a goal of 35 day outages every 30 months. This potentially represents considerable savings to the Bruce Power business plan, both direct revenue savings attributed to reduced outage duration, as well as incremental outage cost savings. Other improvements from the initiative will include personnel radiation exposure and equipment reliability due to decreased outage duration and adherence to scoping, assessing and long lead part milestones. This presentation will describe the outage improvement initiatives to achieve a goal of consistent 35 day

  6. Outage optimization - the US experience and approach

    International Nuclear Information System (INIS)

    LaPlatney, J.

    2007-01-01

    Sustainable development of Nuclear Energy depends heavily on excellent performance of the existing fleet which in turn depends heavily on the performance of planned outages. Some reactor fleets, for example Finland and Germany, have demonstrated sustained good outage performance from their start of commercial operation. Others, such as the US, have improved performance over time. The principles behind a successful outage optimization process are: -) duration is not sole measure of outage success, -) outage work must be performed safely, -) scope selection must focus on improving plant material condition to improve reliability, -) all approved outage work must be completed, -) work must be done cost effectively, -) post-outage plant reliability is a key measure of outage success, and -) outage lessons learned must be effectively implemented to achieve continuous improvement. This approach has proven its superiority over simple outage shortening, and has yielded good results in the US fleet over the past 15 years

  7. Study of electrical power facilities and measures for planned outages in Japanese hemodialysis clinics after the Great East Japan Earthquake.

    Science.gov (United States)

    Ishida, Kai; Sawa, Manami; Fujiwara, Kousaku; Hirose, Minoru; Tsuruta, Harukazu; Takeuchi, Akihiro; Ikeda, Noriaki

    2013-02-01

    The Great East Japan Earthquake on 11 March 2011 caused major damage in northeastern Japan. The Kanto region experienced a massive electrical power shortage in the summer of 2011. A questionnaire was submitted to 354 hemodialysis clinics in Kanagawa prefecture and the Tokyo metropolitan area, excluding isolated islands, and 176 responses were analyzed (49.7%). The questions included evaluation of the availability of a private electricity generator, countermeasures in case of a planned outage, awareness of saving electricity, and improvement of safety of medical devices or electrical facilities after the earthquake. Only 12% of the clinics had private electricity generators and many clinics had no plans to introduce this facility. However, 96% of the clinics had established countermeasures to deal with a planned outage. Many clinics planned to provide dialysis on a different day or at a different time. All clinics had tried hard to establish procedures to save electricity in the summer of 2011, and 84% of the clinics had reconsidered and improved the safety of medical devices or electricity facilities after the earthquake. These results show that the awareness of crisis management was greatly improved in the wake of the earthquake. © 2012 The Authors. Therapeutic Apheresis and Dialysis © 2012 International Society for Apheresis.

  8. Outage information system

    International Nuclear Information System (INIS)

    Svengren, Haakan; Meyer, Brita Diskerud

    2005-09-01

    Today's control room systems are designed to operate during power operation, and there is clearly a need for a system to support control room personnel in automatically supervising the status of the plant during the outage period. In order to improve the supervision of Nuclear Power Plants during outages, three prototypes of the Outage Information system have been designed by the Halden Project, one for PWR and two for BWR. The Outage Information System is presented on a large screen, centrally placed in the control room. There will be a PC connected to manage the system. By using signals from the process as input to logic diagrams reflecting the plant's Safety Technical Specifications, the system automatically is supervising that requirements in Safety Technical Specifications are fulfilled during all plant states of the outage period. The system also automatically gives an overview of the status of safety systems and electrical bus bars. Alarm will occur if a requirement in the Safety Technical Specifications is not fulfilled or if a component planned to be ready for operation, is inoperable. In addition, selected measurements being important during the outage period are presented on the large screen. Which measurements and in which way the values will be presented, depends on the plant's control room design and work practice. (Author)

  9. Assessment and planning of the electrical systems in Mexican refineries by 2014

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz Flores, Luis Ivan; Rodriguez Martinez, Jose Hugo [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico); Dario Taboada; Guillermo; Pano Jimenez, Javier [PEMEX, (Mexico)

    2012-07-01

    Nowadays the refining sector in Mexico needs to increase the quantity and quality of produced fuels by installing new process plants for gasoline and ultra-low sulphur diesel. These plants require the provision of electricity and steam, among other services to function properly, which can be supplied by the power plants currently installed in each refinery through an expansion of their generation capacity. These power plants need to increase its production of electricity and steam at levels above their installed capacity, which involves the addition of new power generating equipment (gas or steam turbo-generators) as well as the raise of the electrical loads. Currently, the Mexican Petroleum Company (PEMEX) is planning to restructure their electrical and steam systems in order to optimally supply the required services for the production of high quality fuels. In this paper the present status of the original electrical power systems of the refineries is assessed and the electrical integration of new process plants in the typical schemes is analyzed. Also this paper shows the conceptual schemes proposed to restructure the electrical power system for two refineries and the strategic planning focused on implement the modifications required for the integration of new process plants that will demand about 20 MW for each refinery by 2014. The results of the analysis allowed to identify the current conditions of the electrical power systems in the oil refining industry or National Refining Industry (NRI), and thereby to offer technical solutions that could be useful to engineers facing similar projects. [Spanish] Hoy en dia, el sector de refinacion en Mexico necesita aumentar la cantidad y calidad de los combustibles producidos, mediante la instalacion de nuevas plantas de proceso para la gasolina y el diesel ultra bajo en azufre. Estas plantas requieren el suministro de electricidad y vapor de agua, entre otros servicios, para que funcione correctamente, los cuales pueden

  10. Outage management

    International Nuclear Information System (INIS)

    Anonymous

    2006-01-01

    Since constructing Japan's first PWR plant, Mihama Unit 1, MHI has been working to upgrade its technologies. The ongoing goal is to provide PWR nuclear power plants with levels of reliability, safety, economy operation and maintainability unparalleled in the world market. To fulfill its obligations and responsibility as an integrated plant manufacturer in the nuclear industry, MHI keeps a close eye on every facility, component, device and sub-component from the viewpoint of its customers. Backed by its rich experience and advanced technology, MHI continues to enhance the safety, reliability and economy of nuclear plants introducing improvements at every level. MHI continues to develop and improve diagnostic and inspection technologies based on its more than 30 years of experience in inspection and servicing the major and auxiliary facilities within nuclear power plants. MHI secures the integrity of components by developing and deploying technologies to minimize the wear of components and to repair and replace parts either degraded by age or unduly susceptible to wear. MHI backs its development of these technologies with its comprehensive technical capabilities in the design of remote operation equipment and electro mechanics as well as its expertise in basic technologies such as welding and machining. Mitsubishi Heavy Industries, Ltd. is not only a PWR plant constructor, but also offers complete outage support and component services. In partnership with our customers, MHI is helping to reduce outage duration, radiation exposure and costs, by providing its state of the art engineering knowledge, advanced non-destructive examination, inspection, maintenance and repair technologies mentioned above. MHI is performing large equipment refurbishment such as Steam Generator Replacement, Reactor Vessel Head Replacement, LP/HP turbine replacement, and recently completed the first Core Internal Replacement in the world. The following activities are part of the outage

  11. Integrated outages increase Surry's availability

    International Nuclear Information System (INIS)

    Harms, S.R.; Downs, J.L.

    1995-01-01

    This article describes how, through Virginia Power's and Westinghouse's goal-oriented planning philosophy, teamwork and commitment, average outage duration has decreased significantly. During the past 10 years Virginia Power and its nuclear steam supply system (NSSS) services vendor, Westinghouse Electric Corp., have developed a working partnership with one goal in mind: increasing the availability and capacity factors of the North Anna and Surry nuclear power stations while driving down the operating costs of the plants. The outage integration program, steam generator maintenance agreement (SGMA), and integrated radiological services program form the core of this relationship and helped Virginia Power complete one of the most successful outages in Surry Power Station's operating history

  12. Nuclear Power Plant Outage Optimization Strategy. 2016 Edition

    International Nuclear Information System (INIS)

    2016-10-01

    This publication is an update of IAEA-TECDOC-1315, Nuclear Power Plant Outage Optimisation Strategy, which was published in 2002, and aims to communicate good outage management practices in a manner that can be used by operators and utilities in Member States. Nuclear power plant outage management is a key factor for safe and economic nuclear power plant performance. This publication discusses plant outage strategy and how this strategy is actually implemented. The main areas that are important for outage optimization that were identified by the utilities and government organizations participating in this report are: 1) organization and management; 2) outage planning and preparation; 3) outage execution; 4) safety outage review; and 5) counter measures to avoid the extension of outages and to facilitate the work in forced outages. Good outage management practices cover many different areas of work and this publication aims to communicate these good practices in a way that they can be used effectively by operators and utilities

  13. Darlington Station outage - a maintenance perspective

    International Nuclear Information System (INIS)

    Plourde, J.; Marczak, J.; Stone, M.; Myers, R.; Sutton, K.

    1997-01-01

    Ontario Hydro's Darlington Nuclear Generating Station (4x881MW(e)net) has carried out its first station outage since full commercial operation. The outage presented challenges to the organization in terms of outage planning, support, management, and safe execution within the constraints of schedule, budget and resources. This paper will focus on the success of the outage maintenance program, identifying the major work programs - a vacuum structure and containment outage, an emergency service water system outage, an emergency coolant injection system outage, intake channel inspections, low pressure service water inspections, and significant outage maintenance work on each of the four reactor units. Planning for the outage was initiated early in anticipation of this important milestone in the station's life. Detailed safety reviews - nuclear, radiation, and conventional - were conducted in support of the planned maintenance program. System lineup and work protection were provided by the Station Operator work group. Work protection permitry was initiated well in advance of the outage. Station maintenance staff resources were bolstered in support of the outage to ensure program execution could be maintained within the schedule. Training programs were in place to ensure that expectations were clear and that high standards would be maintained. Materials management issues in support of maintenance activities were given high priority to ensure no delays to the planned work. Station management review and monitoring in preparation for and during the outage ensured that staff priorities remained focused. Lessons learned from the outage execution are being formalized in maintenance procedures and outage management procedures, and shared with the nuclear community. (author)

  14. Session summaries for workshop meeting on virtual reality applications in process industry maintenance training, outage planning, control room retrofits and design, 17th - 18th September 1998

    International Nuclear Information System (INIS)

    Louka, Michael N.

    1998-09-01

    A well-attended workshop was held in Halden 17th - 18th September 1998 to discuss VR applications in the process industry. In particular, maintenance training, outage planning, decommissioning, control room retrofits, and design were discussed. It is clear that there is a great deal of interest in both current and potential use of VR technology. The workshop participants represented a diverse range of research disciplines, as well as utilities, vendors and regulators (author) (ml)

  15. Nuclear power plant outage optimisation strategy

    International Nuclear Information System (INIS)

    2002-10-01

    Competitive environment for electricity generation has significant implications for nuclear power plant operations, including among others the need of efficient use of resources, effective management of plant activities such as on-line maintenance and outages. Nuclear power plant outage management is a key factor for good, safe and economic nuclear power plant performance which involves many aspects: plant policy, co-ordination of available resources, nuclear safety, regulatory and technical requirements and, all activities and work hazards, before and during the outage. This technical publication aims to communicate these practices in a way they can be used by operators and utilities in the Member States of the IAEA. It intends to give guidance to outage managers, operating staff and to the local industry on planning aspects, as well as examples and strategies experienced from current plants in operation on the optimization of outage period. This report discusses the plant outage strategy and how this strategy is actually implemented. The main areas identified as most important for outage optimization by the utilities and government organizations participating in this report are: organization and management; outage planning and preparation, outage execution, safety outage review, and counter measures to avoid extension of outages and to easier the work in forced outages. This report was based on discussions and findings by the authors of the annexes and the participants of an Advisory Group Meeting on Determinant Causes for Reducing Outage Duration held in June 1999 in Vienna. The report presents the consensus of these experts regarding best common or individual good practices that can be used at nuclear power plants with the aim to optimize

  16. Test plan, the Czechowice Oil Refinery bioremediation demonstration of a process waste lagoon. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Altman, D.J.; Hazen, T.C.; Tien, A.J. [Westinghouse Savannah River Co., Aiken, SC (United States). Savannah River Technology Center; Worsztynowicz, A.; Ulfig, K. [Inst. for Ecology of Industrial Areas, Katowice (Poland)

    1997-05-10

    The overall objective of the bioremediation project is to provide a cost effective bioremediation demonstration of petroleum contaminated soil at the Czechowice Oil Refinery. Additional objectives include training of personnel, and transfer of this technology by example to Poland, and the Risk Abatement Center for Central and Eastern Europe (RACE). The goal of the remediation is to reduce the risk of PAH compounds in soil and provide a green zone (grassy area) adjacent to the site boundary. Initial project discussions with the Czechowice Oil Refinery resulted in helping the refinery find an immediate cost effective solution for the dense organic sludge in the lagoons. They found that when mixed with other waste materials, the sludge could be sold as a fuel source to local cement kilns. Thus the waste was incinerated and provided a revenue stream for the refinery to cleanup the lagoon. This allowed the bioremediation project to focus on remediation of contaminated soil that unusable as fuel, less recalcitrant and easier to handle and remediate. The assessment identified 19 compounds at the refinery that represented significant risk and would require remediation. These compounds consisted of metals, PAH`s, and BTEX. The contaminated soil to be remediated in the bioremediation demonstration contains only PAH (BTEX and metals are not significantly above background concentrations). The final biopile design consists of (1) dewatering and clearing lagoon A to clean clay, (2) adding a 20 cm layer of dolomite with pipes for drainage, leachate collection, air injection, and pH adjustment, (3) adding a 1.1 m layer of contaminated soil mixed with wood chips to improve permeability, and (4) completing the surface with 20 cm of top soil planted with grass.

  17. Test plan, the Czechowice Oil Refinery bioremediation demonstration of a process waste lagoon. Revision 1

    International Nuclear Information System (INIS)

    Altman, D.J.; Hazen, T.C.; Tien, A.J.

    1997-01-01

    The overall objective of the bioremediation project is to provide a cost effective bioremediation demonstration of petroleum contaminated soil at the Czechowice Oil Refinery. Additional objectives include training of personnel, and transfer of this technology by example to Poland, and the Risk Abatement Center for Central and Eastern Europe (RACE). The goal of the remediation is to reduce the risk of PAH compounds in soil and provide a green zone (grassy area) adjacent to the site boundary. Initial project discussions with the Czechowice Oil Refinery resulted in helping the refinery find an immediate cost effective solution for the dense organic sludge in the lagoons. They found that when mixed with other waste materials, the sludge could be sold as a fuel source to local cement kilns. Thus the waste was incinerated and provided a revenue stream for the refinery to cleanup the lagoon. This allowed the bioremediation project to focus on remediation of contaminated soil that unusable as fuel, less recalcitrant and easier to handle and remediate. The assessment identified 19 compounds at the refinery that represented significant risk and would require remediation. These compounds consisted of metals, PAH's, and BTEX. The contaminated soil to be remediated in the bioremediation demonstration contains only PAH (BTEX and metals are not significantly above background concentrations). The final biopile design consists of (1) dewatering and clearing lagoon A to clean clay, (2) adding a 20 cm layer of dolomite with pipes for drainage, leachate collection, air injection, and pH adjustment, (3) adding a 1.1 m layer of contaminated soil mixed with wood chips to improve permeability, and (4) completing the surface with 20 cm of top soil planted with grass

  18. Outage management philosophies at Oconee nuclear station

    International Nuclear Information System (INIS)

    Bond, R.T.

    1991-01-01

    At Oconee the biggest single factor in improving availability and cutting cost per kilowatt-hour is reducing outage lengths. This must be accomplished without compromising the quality of the work that must be performed during these outages. Oconee has completed 35 refueling outages and has gained considerable experience in outage management. Since 1984, outage costs and durations have consistently been reduced while continuing to improve capacity factors. The last 6 refueling outages were 43, 42, 45, 42, 41, and 44 days, respectively. The capacity factors for these units between refueling outages are 98, 94, 96, 98, and 98%, respectively. The average cost of outages has been less than $12 million. It is believed that success cannot be attributed to any one factor by itself but is a compilation of many factors, all complementing each other. It is also believed, however, that there are four key areas that represent philosophies and can be given most of the credit for successful outages: planning, experience, teamwork, and outage management

  19. [Responding to patients with home mechanical ventilation after the Great East Japan Earthquake and during the planned power outages. How should we be prepared for a future disaster ?].

    Science.gov (United States)

    Takechi, Yukako

    2011-12-01

    The unprecedented earthquake(magnitude-9 in the Japanese seismic intensity scale)hit off the east coast of Japan on March 11, 2011. Consequently, there were planned power outages in the area nearby Tokyo to avoid massive blackouts caused by a stoppage of Fukushima nuclear plants.Our clinic located in Kawasaki city was also hit by the earthquake(magnitude- 5).During the period of two months(March and April 2011), we had a total of 52 patients with home respiratory care (5-TPPV, 11-NPPV and 36-HOT)at that time.Two out of three 24 hour-TPPV users had no external battery.After the earthquake, there was a 7-hour electricity failure in some areas, and a patient with ASV(adaptive servo ventilator)was living there.Moreover, 3-hour/day power outages were carried out from March 14 to March 28, affecting people's everyday lives. However, the patient had no harmful influences from the power failure because a ventilation company lent us an external battery(4-9 hour life capacity)for the patients, and we were able to avoid an emergency situation caused by the power failure.In conclusion, we ought to be prepared for patients with home mechanical ventilation in the future toward unforeseen large scale power outages.

  20. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  1. Yugoslavian Petroleum Refinery development program

    International Nuclear Information System (INIS)

    Ocic, Ozren

    1999-01-01

    This paper shows the analysis of the world petroleum industry development, being an important factor in planning the development of the Yugoslav petroleum industry and Pancevo Petroleum Refinery, as well. Then Yugoslav petroleum industry development is analysed, including the appropriate balances of crude oil production and crude oil products consumption. The way of realizing the basic targets are also proposed. Likewise, the analysis of the condition within West European refineries has been conducted, from the aspects of technology, energy consumption and environmental protection and the same analysis for Pancevo Petroleum Refinery has been presented, too. The analysis of the condition within the refineries in the European Union countries and comparing it with the condition within Pancevo Petroleum Refinery, makes it mainly possible to recognize the development programmes which should be realized in order that Pancevo Petroleum Refinery could reach the refining level of the EU countries. (Original)

  2. Management strategies for nuclear power plant outages

    International Nuclear Information System (INIS)

    2006-01-01

    More competitive energy markets have significant implications for nuclear power plant operations, including, among others, the need for more efficient use of resources and effective management of plant activities such as on-line maintenance and outages. Outage management is a key factor for safe, reliable and economic plant performance and involves many aspects: plant policy, coordination of available resources, nuclear safety, regulatory and technical requirements, and all activities and work hazards, before and during the outage. The IAEA has produced this report on nuclear power plant outage management strategies to provide both a summary and an update of a follow-up to a series of technical documents related to practices regarding outage management and cost effective maintenance. The aim of this publication is to identify good practices in outage management: outage planning and preparation, outage execution and post-outage review. As in in the related technical documents, this report aims to communicate these practices in such a way that they can be used by operating organizations and regulatory bodies in Member States. The report was prepared as part of an IAEA project on continuous process improvement. The objective of this project is to increase Member State capabilities in improving plant performance and competitiveness through the utilization of proven engineering and management practices developed and transferred by the IAEA

  3. Model-centered approach to early planning and design of an eco-industrial park around an oil refinery.

    Science.gov (United States)

    Zhang, Xiangping; Strømman, Anders H; Solli, Christian; Hertwich, Edgar G

    2008-07-01

    Industrial symbiosis promises environmental and economic gains through a utilization of the waste of some processes as a resource for other processes. Because of the costs and difficulties of transporting some wastes, the largest theoretical potential for industrial symbiosis is given when facilities are colocated in an eco-industrial park (EIP). This study proposes a model-centered approach with an eight-step procedure for the early planning and design of an eco-industrial park considering technical and environmental factors. Chemical process simulation software was used to model the energy and material flows among the prospective members and to quantify the benefits of integration among different firms in terms of energy and resources saved as compared to a reference situation. Process simulation was based on a combination of physical models of industrial processes and empirical models. The modeling allows for the development and evaluation of different collaboration opportunities and configurations. It also enables testing chosen configurations under hypothetical situations or external conditions. We present a case study around an existing oil and gas refinery in Mongstad, Norway. We used the approach to propose the colocation of a number of industrial facilities around the refinery, focused on integrating energy use among the facilities. An EIP with six main members was designed and simulated, matching new hypothetical members in size to the existing operations, modeling material and energy flows in the EIP, and assessing these in terms of carbon and hydrogen flows.

  4. Test plan: the Czechowice Oil Refinery bioremediation demonstration of a process waste lagoon

    Energy Technology Data Exchange (ETDEWEB)

    Altman, D.J.; Lombard, K.H.; Hazen, T.C.

    1997-03-31

    The remediation strategies that will be applied at the Czechowice Oil Refinery waste lagoon in Czechowice, Poland are designed, managed, and implemented under the direction of the Westinghouse Savannah River Company (WSRC) for the United States Department of Energy (DOE). WSRC will be assisted in the demonstration by The Institute for Ecology of Industrial Areas (IETU). This collaboration between IETU and DOE will provide the basis for international technology transfer of new and innovative remediation technologies that can be applied in Poland and the Eastern European Region as well.

  5. Outage management: A case study

    International Nuclear Information System (INIS)

    Haber, S.B.; Barriere, M.T.; Roberts, K.H.

    1992-01-01

    Outage management issues identified from a field study conducted at a two-unit commercial pressurized water reactor (PWR), when one unit was in a refueling outage and the other unit was at full power operation, are the focus of this paper. The study was conduced as part of the US Nuclear Regulatory Commission's (NRC) organizational factors research program, and therefore the issues to be addressed are from an organizational perspective. Topics discussed refer to areas identified by the NRC as critical for safety during shutdown operations, including outage planning and control, personnel stress, and improvements in training and procedures. Specifically, issues in communication, management attention, involvement and oversight, administrative processes, organizational culture, and human resources relevant to each of the areas are highlighted by example from field data collection. Insights regarding future guidance in these areas are presented based upon additional data collection subsequent to the original study

  6. Qinshan CANDU NPP outage performance improvement through benchmarking

    International Nuclear Information System (INIS)

    Jiang Fuming

    2005-01-01

    With the increasingly fierce competition in the deregulated Energy Market, the optimization of outage duration has become one of the focal points for the Nuclear Power Plant owners around the world. People are seeking various ways to shorten the outage duration of NPP. Great efforts have been made in the Light Water Reactor (LWR) family with the concept of benchmarking and evaluation, which great reduced the outage duration and improved outage performance. The average capacity factor of LWRs has been greatly improved over the last three decades, which now is close to 90%. CANDU (Pressurized Heavy Water Reactor) stations, with its unique feature of on power refueling, of nuclear fuel remaining in the reactor all through the planned outage, have given raise to more stringent safety requirements during planned outage. In addition, the above feature gives more variations to the critical path of planned outage in different station. In order to benchmarking again the best practices in the CANDU stations, Third Qinshan Nuclear Power Company (TQNPC) have initiated the benchmarking program among the CANDU stations aiming to standardize the outage maintenance windows and optimize the outage duration. The initial benchmarking has resulted the optimization of outage duration in Qinshan CANDU NPP and the formulation of its first long-term outage plan. This paper describes the benchmarking works that have been proven to be useful for optimizing outage duration in Qinshan CANDU NPP, and the vision of further optimize the duration with joint effort from the CANDU community. (authors)

  7. Review of Paks outage results 1990

    International Nuclear Information System (INIS)

    Lukacs, P.; Zsoldos, F.; Kiss, Z.

    1991-01-01

    The year 1990 was not the most successful from an outage point of view at the Paks Nuclear Power Plant in Hungary -there were one or two long delays. Work at unit 4 had a delay of 10 days because of an error made during assembling the reactor vessel. While the outage of unit 3 was running, a feedwater pipe hanger problem was discovered - several hangers were found displaced from the right position. A general inspection of the affected system was required and this took about 11 days. Information about each outage is presented on diagrams, making comparison easier. These diagrams give information about deviations from the outage plan, about work hours performed during outages, and about collective exposure. (author)

  8. WNP-2 outage safety review methodology

    International Nuclear Information System (INIS)

    Chiang, Albert; Fu, James

    2004-01-01

    A practical and versatile method was developed in the flow chart and checklist forms to show the defense-in-depth for various key safety functions of a nuclear power plant during shutdown. Using four different colors (green, yellow, orange, and red) for indication of levels of defense-in-depth is visually impressive, easy to understand, and was adopted by the outage management personnel as a convenient reference tool for maintenance activity planning before the outage, and schedule changes during the outage. This paper describes the method and its application at Washington Public Power Supply System's Nuclear Project 2 (WNP-2). (author)

  9. Refinery profitability

    International Nuclear Information System (INIS)

    Tobin, G.

    1998-01-01

    Recently there has been considerable shutting down of oil refinery capacity in response to the increasing pressures on profitability. This article examines the situation and the industry's response to it, including the drive for mergers, disposal of fuel oil, downsizing of workforces and strategic alliances. Future trends and their implications are also discussed. (UK)

  10. Proposed Plan for the R-Area Bingham Pump Outage Pits (643-8G, -9G, -10G) and R-Area Unknown Pits No.1, No.2, No.3 (RUNK-1, -2, -3); FINAL

    International Nuclear Information System (INIS)

    Mundy, S.

    2002-01-01

    The purpose of this proposed plan is to describe the preferred remedial alternative for the R-Area Bingham Pump Outage Pits (R BPOPs) and the R-Area Unknowns (RUNKs) operable unit (OU) and to provide for public involvement in the decision-making process

  11. Integrated use of Primavera and ORAM codes in outage 1999 at NPP Krsko

    International Nuclear Information System (INIS)

    Krajnc, J.; Skaler, F.; Basic, I.; Kocnar, R.

    1999-01-01

    The paper deals with the following postulated main goals of outage scheduling with Primavera tool at Krsko NPP: planning and controlling of resources (people, equipment, locations, sources), controlling the safety aspects of an outage and assuring defense-in-depth philosophy (through integrated safety assessment by ORAM code), diversity use of the plan during preparations period and outage progress (MCB, work leaders, management, planning Dept., subcontractors, support, etc.), allowing for optimization of outage duration. A snapshot in Primavera of what actually happened in outage 1999, lessons learned and a new work template is the scope of the next year outage.(author)

  12. Nuclear power plant outages

    International Nuclear Information System (INIS)

    1998-01-01

    The Finnish Radiation and Nuclear Safety Authority (STUK) controls nuclear power plant safety in Finland. In addition to controlling the design, construction and operation of nuclear power plants, STUK also controls refuelling and repair outages at the plants. According to section 9 of the Nuclear Energy Act (990/87), it shall be the licence-holder's obligation to ensure the safety of the use of nuclear energy. Requirements applicable to the licence-holder as regards the assurance of outage safety are presented in this guide. STUK's regulatory control activities pertaining to outages are also described

  13. Nuclear outages: an approach to project controls

    International Nuclear Information System (INIS)

    Bryson, R.

    1985-01-01

    The annual budget for maintaining and operating a nuclear power plant has risen dramatically over the past 5 years. NRC-mandated plant improvements and outage related expenses are often cited to be the main contributors to these escalating budgets. Nuclear utilities have responded by developing programs to improve plant availability and outage costs through improved outage performance. Utilities recognize that for capital improvements the program to control costs does no begin with outage planning, but rather more appropriately up front during the engineering phase. To support their management objectives, utilities have been developing comprehensive project control systems for concurrently reducing capital expenditures, outage-related costs, and time. This paper provides an approach to project controls that, rather than using one all inclusive comprehensive system, requires five separate monitoring systems - one for each phase of an activity's life cycle. Through the integration of these discrete but interrelated systems, utility management acquires the necessary tools for comprehensive planning and control of their modification program and effective detailed monitoring for all outage-related activities

  14. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  15. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  16. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  17. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  18. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  19. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  20. Framatome ANP outage optimization support solutions

    International Nuclear Information System (INIS)

    Bombail, Jean Paul

    2003-01-01

    Over the last several years, leading plant operators have demonstrated that availability factors can be improved while safety and reliability can be enhanced on a long-term basis and operating costs reduced. Outage optimization is the new term being used to describe these long-term initiatives through which a variety of measures aimed at shortening scheduled plant outages have been developed and successfully implemented by these leaders working with their service providers who were introducing new technologies and process improvements. Following the leaders, all operators now have ambitious outage optimization plans and the median and average outage duration are decreasing world-wide. Future objectives are even more stringent and must include plant upgrades and component replacements being performed for life extension of plant operation. Outage optimization covers a broad range of activities from modifications of plant systems to faster cool down rates to human behavior improvements. It has been proven to reduce costs, avoid unplanned outages and thus support plant availability and help to ensure the utility's competitive position in the marketplace

  1. Oil refineries

    International Nuclear Information System (INIS)

    Boehmer, S.; Winter, B.

    2001-01-01

    In refineries in particular attention is paid to the minimization of the generation of waste. Therefor catalysts in many processes are regenerated, absorbents are recycled and oily by-products are re-refined or used as fuels. This study discusses the origin and utilization of by-products from the oil industry. The processing of crude oils causes by-products and waste resulting from the crude oil itself or from cleaning measures for water pre-treatment, effluent treatment and flue gas treatment. (author)

  2. Outage time reduction in GKN II without loss of safety

    International Nuclear Information System (INIS)

    Sturm, J.

    1999-01-01

    GKN II is a 1340 MWE 4-loop pressurised water reactor from Siemens KONVOI type, located in the south of Germany. It was originally connected to the grid at the end of 1988. Commercial operation under utility responsibility started at the second half of 1989. The first outage was performed in 1990. Beginning from this date, the outage duration was contiguously reduced from 33 days to 15 days in 1996. In 1998, two refueling and maintenance outages were performed, each with a duration of 7 days. Key planning factors to achieve these results are: A well adapted planning organisation with an outage manager and an outage planning team. An effective long term planning. This means the combination of work with a long duration every 4 or 8 years. No longlasting work in the years in between. Main work only on one safety train per year. Optimisation and standardisation of the shutdown and the startup sequence. The real change of reactor states have been modified, compared to the vendor recommendations. An tests are assigned to plant conditions, where they are most effective and are less time critical. Small modifications in the plant, mainly on the auxiliary systems, to speedup some sequences. Extreme detailed planning of maintenance and periodic tests. Each work/test can be found in a detailed schedule with a dedicated time widow. Optimized tools to perform the detailed planning and to implement the feedback of experience from former outages. Optimized tools for maintenance and handlings of heavy equipment on the critical path. Optimized tools to perform periodic tests. Key factors during outage are: Permanent control of the schedules with an updated 3-day program. Best and permanent information with this 3-day program of all people that are involved. Fast reaction on delays. Outage managers permanent on site. Gain in safety during shutdown states, with reduced outage duration: It has to be proven, that short outages don't lead to faster and less accurate work. It can be

  3. Reactor refurbishment in an outage environment

    International Nuclear Information System (INIS)

    Gowthorpe, P.; Hoare, R.

    2012-01-01

    Reactor life extension has typically been performed during specific refurbishment outages. These outages are long and costly due to the sheer complexity of the scope, not to mention the ever present discovery work. A scope of this size requires a huge labour force to execute, which poses significant challenges. The work is difficult to staff with qualified people able to execute the work smoothly and managing the required labour pool problematic. Cost and time overruns are inevitable in that environment. Reducing the cost and schedule is critical to the long term viability of reactor refurbishment projects. With planning, the total cost of the refurbishment can be reduced by managing the inspection and repairs during normal outages. Identifying what activities need to be done each outage for the life of the reactor and bringing the latest technology can make this viable. Tightly planned outages with a small well trained labour force will go a long way to reducing costs. The suite of services and tooling available to the utilities to manage their reactor integrity has improved significantly in recent years and continues to evolve. New feeder inspection technologies can provide improved inspection results for the complex feeder geometry. These improvements lead to more accurate wear rates and better predictions of component life. Feeders that need replacement based on improved inspection techniques can be replaced systematically during regular outages rather than specific refurbishment outages. Targeting areas rather than entire feeders reduces time, dose and cost. In cases where feeder replacement isn't feasible or where unpredicted wear is found, a feeder weld overlay process can be used. To manage the reactor work, new data systems are under development that allow for effective tracking of each activity performed and outcomes in a single package. (author)

  4. Analysis of T101 outage radiation dose

    International Nuclear Information System (INIS)

    Li, Zhonghua

    2008-01-01

    Full text: Collective radiation dose during outage is about 80% of annual collective radiation dose at nuclear power plants (NPPs). T 101 Outage is the first four-year outage of Unit 1 at Tianwan Nuclear Power Station (TNPS) and thorough overhaul was undergone for the 105-day's duration. Therefore, T 101 Outage has significant reference meaning to reducing collective radiation dose at TNPS. This paper collects the radiation dose statistics during T 101 Outage and analyses the radiation dose distribution according to tasks, work kinds and varying trend of the collective radiation dose etc., comparing with other similar PWRs in the world. Based on the analysis this paper attempts to find out the major factors in collective radiation dose during T 101 Outage. The major positive factor is low radiation level at workplace, which profits from low content of Co in reactor construction materials, optimised high-temperature p H value of the primary circuit coolant within the tight range and reactor operation without trips within the first fuel cycle. One of the most negative factors is long outage duration and many person-hours spent in the radiological controlled zone, caused by too many tasks and inefficient work. So besides keeping good performance of reducing radioactive sources, it should be focused on how to improve implementation of work management including work selection, planning and scheduling, work preparation, work implementation, work assessment and feedback, which can lead to reduced numbers of workers needed to perform a task, of person-hours spent in the radiological controlled zone. Moreover, this leads to reduce occupational exposures in an ALARA fashion. (author)

  5. Advanced Test Reactor outage risk assessment

    International Nuclear Information System (INIS)

    Thatcher, T.A.; Atkinson, S.A.

    1997-01-01

    Beginning in 1997, risk assessment was performed for each Advanced Test Reactor (ATR) outage aiding the coordination of plant configuration and work activities (maintenance, construction projects, etc.) to minimize the risk of reactor fuel damage and to improve defense-in-depth. The risk assessment activities move beyond simply meeting Technical Safety Requirements to increase the awareness of risk sensitive configurations, to focus increased attention on the higher risk activities, and to seek cost-effective design or operational changes that reduce risk. A detailed probabilistic risk assessment (PRA) had been performed to assess the risk of fuel damage during shutdown operations including heavy load handling. This resulted in several design changes to improve safety; however, evaluation of individual outages had not been performed previously and many risk insights were not being utilized in outage planning. The shutdown PRA provided the necessary framework for assessing relative and absolute risk levels and assessing defense-in-depth. Guidelines were written identifying combinations of equipment outages to avoid. Screening criteria were developed for the selection of work activities to receive review. Tabulation of inherent and work-related initiating events and their relative risk level versus plant mode has aided identification of the risk level the scheduled work involves. Preoutage reviews are conducted and post-outage risk assessment is documented to summarize the positive and negative aspects of the outage with regard to risk. The risk for the outage is compared to the risk level that would result from optimal scheduling of the work to be performed and to baseline or average past performance

  6. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  7. Former Soviet refineries face modernization, restructuring

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    A massive modernization and restructuring program is under way in the refining sector of Russia and other former Soviet republics. Economic reforms and resulting economic dislocation following the collapse of the Soviet Union has left refineries in the region grappling with a steep decline and changes in product demand. At the same time, rising oil prices and an aging, dilapidated infrastructure promise a massive shakeout. Even as many refineries in the former Soviet Union (FSU) face possible closure because they are running at a fraction of capacity, a host of revamps, expansions, and grass roots refineries are planned or under way. The paper discusses plans

  8. The process of NPP refuelling outage analysis and follow-up

    International Nuclear Information System (INIS)

    Nemec, T.; Savli, S.; Cernilogar Radez, M.; Persic, A.; Pecek, V.; Stritar, A.

    2007-01-01

    Following the outages in 2004 and 2006, the Slovenian Nuclear Safety Administration (SNSA) has started with the practice of independent outage analysis in a form of an internal report. It includes a comparison of performed activities against the planned time schedule of activities, evaluation of design modifications implementation and analysis of significant events. The main result of the outage analysis is a list of recommendations and some open issues that have been identified. These findings are the basis for development of an action plan for SNSA activities until the next outage, aimed at eliminating deficiencies found out during the outage and further improving outage activities. The established system of outage supervision together with the final analysis and long term action plan represents an effective continuous safety supervision process, by which the regulatory body independently contributes to the higher level of safety culture both at the licensee and among its own staff. (author)

  9. Guidelines for Implementation of an Advanced Outage Control Center to Improve Outage Coordination, Problem Resolution, and Outage Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    St. Germain, Shawn W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald K. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whaley, April M. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Medema, Heather D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Gertman, David I. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provide the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The purpose of this research is to improve management of nuclear power plant (NPP) outages through the development of an advanced outage control center (AOCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This technical report for industry implementation outlines methods and considerations for the establishment of an AOCC. This report provides a process for implementation of a change management plan, evaluation of current outage processes, the selection of technology, and guidance for the implementation of the selected technology. Methods are presented for both adoption of technologies within an existing OCC and for a complete OCC replacement, including human factors considerations for OCC design and setup.

  10. Outage reduction of Hamaoka NPS

    International Nuclear Information System (INIS)

    Hida, Shigeru; Anma, Minoru

    1999-01-01

    In the Hamaoka nuclear power plant, we have worked on the outage reduction since 1993. In those days, the outage length in Hamaoka was 80 days or more, and was largely far apart from excellent results of European and American plants about the 30days. A concrete strategy to achieve the reduction process is the extension of working hours, the changing work schedule control unit for every hour, the equipment improvements, and the improvements of work environments, etc. We executed them one by one reflecting results. As a result, we achieved the outage for 57 days in 1995. Starting from this, we acquired the further outage reduction one by one and achieved the outage for 38 days in 1997 while maintaining safety and reliability of the plant. We advance these strategies further and we will aim at the achievement of the 30·35 days outage in the future. (author)

  11. Diablo Canyon refueling outage program

    International Nuclear Information System (INIS)

    McLane, W.B.; Irving, T.L.

    1991-01-01

    Management of outages has become one of the most talked about subjects in the nuclear power industry in the past several years. Many utilities do not perform refueling outages very well or in the past have had some outages that they would not like to repeat and in some cases do not even like to think about. With the growing cost of energy and the demands placed on utilities to improve capacity factors, it is very easy for management to focus on shortening refueling outage durations as a prime objective in improving overall corporate performance. So it is with Pacific Gas and Electric Company and the Diablo Canyon power plant. A review of their refueling outage performance reflects a utility that is responding to the nuclear industry's call for improved outage performance

  12. Programming and organisation of unit outages

    International Nuclear Information System (INIS)

    Hadjidakis, Y.; Cezard, C.; Audierne, J.

    1997-01-01

    The unit outages are scheduled every 12 to 18 months for fuel reloading. The success of these shutdowns, with the whole of objectives (duration, dosimetry, costs), with maintaining the safety level, is an important stake for the competitiveness of the enterprise. In this article are described the planning, the experience return and the organisation of scheduled shutdowns which have contribute to the improvement of availability. (N.C.)

  13. Outage Risk Assessment and Management (ORAM) technology to improve outage safety and economics

    International Nuclear Information System (INIS)

    Kalra, S.P.

    2004-01-01

    The Electric Power Research Institute (EPRI) has undertaken an aggressive program, called ORAM (Outage Risk Assessment and Management), to provide utilities with tools and technology to assist in managing risk during the planning and conduct of outages. The ORAM program consists of the following 6 steps: i) Perform utility surveys and visits on shutdown risk management needs, ii) Perform probabilistic shutdown safety assessments (PSSAs) to identify generic insights that can be incorporated into risk management guidelines and identify selected areas for the development of contingency actions, iii) Develop risk management guidelines (RMG's) that provide a systematic approach to the planning and conduct of outages from a safety perspective. Incorporate insights from the shutdown safety assessments and other operating experience into the RMG's. iv) Develop selected contingency actions including a thermalhydraulic tool kit to address higher risk time periods and activities identified in the shutdown safety assessments, v) Develop computer software that integrates all of the above capability into an easy to use tool for effective shutdown operation management for utilities, vi) Provide assistance in the transfer of this technology and the application of these tools. This paper briefly describes the technical approach and tools developed under EPRI's ORAM program and its applications for improving outage safety and economics. (author)

  14. Nuclear Plant Integrated Outage Management

    International Nuclear Information System (INIS)

    Gerstberger, C. R.; Coulehan, R. J.; Tench, W. A.

    1992-01-01

    This paper is a discussion of an emerging concept for improving nuclear plant outage performance - integrated outage management. The paper begins with an explanation of what the concept encompasses, including a scope definition of the service and descriptions of the organization structure, various team functions, and vendor/customer relationships. The evolvement of traditional base scope services to the integrated outage concept is addressed and includes discussions on changing customer needs, shared risks, and a partnership approach to outages. Experiences with concept implementation from a single service in 1984 to the current volume of integrated outage management presented in this paper. We at Westinghouse believe that the operators of nuclear power plants will continue to be aggressively challenged in the next decade to improve the operating and financial performance of their units. More and more customers in the U. S. are looking towards integrated outage as the way to meet these challenges of the 1990s, an arrangement that is best implemented through a long-term partnering with a single-source supplier of high quality nuclear and turbine generator outage services. This availability, and other important parameters

  15. Good practices for outage management in nuclear power plants

    International Nuclear Information System (INIS)

    1991-09-01

    As a follow-up to an earlier Technical Document on Good Practices for Improved Nuclear Power Plant Performance (IAEA-TECDOC-498), the Agency has produced a more focused technical report on good practices associated with nuclear power plant outage planning and execution. As with the earlier document, the overall aim is that by identifying good practices in the key aspects of outage management, overall world nuclear performance will improve and the gap between excellent performers and operators with developing programmes will be narrowed. This document has been produced through the contribution of numerous operators and government agencies. It aims at minimizing text and focusing on actual good practices in use which can be found in the annexes. While the specific methods used to achieve excellence in maintenance/refuelling outages may differ, the fundamental requirements of outage management are discussed

  16. Extended layup of steam generators during a refurbishment outage

    International Nuclear Information System (INIS)

    Marks, C.R.; Little, M.D.; Slade, J.; Gendron, T.

    2009-01-01

    In May 2008, Point Lepreau Generating Station (PLGS), owned and operated by New Brunswick Power Nuclear (NBPN), entered an extended refurbishment outage initially expected to last approximately 18 months. NBPN had the two inter-related goals with respect to layup of the steam generators during this period: equipment preservation and inspection interval modification. The steam generators were to be preserved such that there was no loss of operating life due to corrosion of either the tubing (Alloy 800NG) or other internal components (with carbon steel being the limiting material with respect to corrosion). Additionally, NBPN desired that the time in layup not count as operating time in setting the schedule for future inspections. That is, a key goal of the steam generator layup is that the future inspection interval be based on operating time, not calendar time. The NBPN approach consists of the following four steps: A review of industry operating experience with long outages (including both PWRs and PHWRs); The development of technically based layup strategies and procedures; A mid-outage review of the implementation of the layup strategies and procedures; and A post-outage review to determine if the actual conditions in the steam generators will support modification of the inspection interval. This paper discusses the results of the first three of these steps. At this time, the plant is still in the refurbishment outage. Throughout the outage evaluation process, the following issues have been the main focus of the reviews: The potential for degradation (pitting and cracking) of steam generator tubes; The potential for general corrosion of carbon and low alloy steel internals; Oxidation of deposits (which could subsequently lead to oxidizing conditions during operation, possibly leading to tube degradation). This paper discusses the industry operating experience reviewed, the pre-outage assessments, and the mid-outage assessments. Current outage planning places the

  17. Development and demonstration of techniques for reducing occupational radiation doses during refueling outages. Tasks 7A/7B. Advanced outage management and radiation exposure control

    International Nuclear Information System (INIS)

    1985-03-01

    Objectives of Tasks 7A and 7B were to develop and demonstrate computer based systems to assist plant management and staff in utilizing information more effectively to reduce occupational exposures received as a result of refueling outages, and to shorten the duration of the outage. The Advanced Outage Management (AOM) Tool (Task 7A) is an automated outage planning system specifically designed to meet the needs of nuclear plant outage management. The primary objective of the AOM tool is to provide a computerized system that can manipulate the information typically associated with outage planning and scheduling to furnish reports and schedules that more accurately project the future course of the outage. The Radiation Exposure Control (REC) Tool (Task 7B) is a computerized personnel radiation exposure accounting and management system designed to enable nuclear plant management to project and monitor total personnel radiation exposure on a real-time basis. The two systems were designed to operate on the same computer system and interface through a common database that enables information sharing between plant organizations not typically interfaced. This interfacing provides outage planners with a means of incorporating occupational radiation exposure as a factor for making decisions on the course of an outage

  18. Two refineries running crude; third to restart by September

    International Nuclear Information System (INIS)

    Tippee, B.

    1993-01-01

    Kuwait's downstream oil and gas industry, which sustained less damage than the country's oil field infrastructure during the Iraqi occupation of the 1990-91, has nearly completed reconstruction. Two of three refineries have resumed operations, one of them at reduced crude distillation rates. And state-owned Kuwait National Petroleum Co. hopes to put the other refinery, Shuaiba, back on stream in September, although not at preinvasion throughput rates. Major reconstruction will be complete by year end, with crude oil distillation capacity at 650,000 b/sd. Preinvasion crude capacities of Kuwait's refineries totaled 840,000 b/d. The article describes an overview of the recovery; the status of the Mina Abdulla processing plant, the Mina Al-Ahmadi refinery, and the Shuaiba refinery; modernization plans, and plans for petrochemicals

  19. The control of reactor outages

    International Nuclear Information System (INIS)

    Bouget, Y.H.; Berteloot, J.M.

    1995-01-01

    The 1985-1992 period was marked by a continuous decay in French reactors operation. This situation has led the Committee for Outages Mastery to take steps for the improvement of nuclear power plants availability. The control of reactor outages requires an integrated vision of the safety, duration, dosimetry, costs and security aspects and a perfect management of contractors. The paper describes the methodology used for the management and the maintenance of the French PWR reactors stock. A detailed schedule of maintenance tasks with dose estimations is now required from each site to anticipate and optimize the duration of outages. Thanks to this action, a significant reduction of the maintenance costs is observed for the 1992-1995 period. (J.S.). 2 figs

  20. Outage costs: who should pay?

    International Nuclear Information System (INIS)

    Stivison, D.V.

    1986-01-01

    Decisions affecting the Three Mile Island-1 and -2 reactors illustrate new an stricter standards which apply to how regulator will allocate the costs of outages. The rule allows outages for normal refueling and other normal shutdowns if return to the power grid is assured. TMI-1 was removed from the rate base one year after the accident, and was readmitted only after achieving full power in 1986. A reasonableness standard based on an analysis of the outage and utility responses is the basis for deciding for or against removal. The author cites cases in which unreasonable actions caused the Nuclear Regulatory Commission to charge utility management with imprudence. New safety standards will force utilities to reduce employee error, equipment failure, and management weakness. 19 references

  1. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  2. Improving refueling outages through partnership

    International Nuclear Information System (INIS)

    Mercado, Angelo L.

    2004-01-01

    This paper describes an approach to reduce nuclear plant outage duration and cost through partnership. Partnership is defined as a long-term commitment between the utility and the vendor with the objective of achieving shared business goals by maximizing the effectiveness of each party's resources. The elements of an effective partnership are described. Specific examples are given as to how partnership has worked in the effective performance of refueling outages. To gain the full benefits of a partnership, both parties must agree to share information, define the scope early, communicate goals and expectations, and identify boundaries for technical ownership. (author)

  3. Outage capacity of multicarrier systems

    KAUST Repository

    Yilmaz, Ferkan; Alouini, Mohamed-Slim

    2010-01-01

    The probability density function and the cumulative distribution function of the product of shifted Gamma variates are obtained in terms of the generalized Fox's H function. Using these new results, the exact outage capacity of multi carrier transmission through a slow Nakagami-m fading channel is presented. Moreover, it is shown that analytical and simulation results are in perfect agreement. © 2009 IEEE.

  4. Questions and perceptions about nuclear power plant outages

    International Nuclear Information System (INIS)

    Mc Donald, R.P.

    1985-01-01

    The most commonly used measure of nuclear power plant productivity is ''availability'' which is usually construed to be the percentage of time in a given period that a nuclear unit is actually tied to a grid supplying electrical power. When a unit is not tied to a grid, it is in an ''outage'' condition, possibly being shutdown, refueled, repaired, or in some stage of startup. There are some very positive by-products of well performed outages in addition to cost and availability enhancements: almost all supervisory and engineering personnel participate in planning and preparations. This approach promotes the professional and leadership development of each person, the supervisors and engineers participate in a competitive venture as a team and enjoy and benefit from comparative interactions with other utilities, perhaps the greatest benefit reaped from the development of outage management expertise is the improved ability to handle unexpected plant problems

  5. Development of Methodologies for Technology Deployment for Advanced Outage Control Centers that Improve Outage Coordination, Problem Resolution and Outage Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    Shawn St. Germain; Ronald Farris; Heather Medeman

    2013-09-01

    This research effort is a part of the Light-Water Reactor Sustainability (LWRS) Program, which is a research and development (R&D) program sponsored by Department of Energy (DOE) and performed in close collaboration with industry R&D programs that provides the technical foundations for licensing and managing the long-term, safe, and economical operation of current nuclear power plants. The LWRS program serves to help the U.S. nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The long term viability of existing nuclear power plants in the U.S. will depend upon maintaining high capacity factors, avoiding nuclear safety issues and reducing operating costs. The slow progress in the construction on new nuclear power plants has placed in increased importance on maintaining the output of the current fleet of nuclear power plants. Recently expanded natural gas production has placed increased economic pressure on nuclear power plants due to lower cost competition. Until recently, power uprate projects had steadily increased the total output of the U.S. nuclear fleet. Errors made during power plant upgrade projects have now removed three nuclear power plants from the U.S. fleet and economic considerations have caused the permanent shutdown of a fourth plant. Additionally, several utilities have cancelled power uprate projects citing economic concerns. For the past several years net electrical generation from U.S. nuclear power plants has been declining. One of few remaining areas where significant improvements in plant capacity factors can be made is in minimizing the duration of refueling outages. Managing nuclear power plant outages is a complex and difficult task. Due to the large number of complex tasks and the uncertainty that accompanies them, outage durations routinely exceed the planned duration. The ability to complete an outage on or near

  6. The miraculously saved refineries

    International Nuclear Information System (INIS)

    Cosnard, D.

    2005-01-01

    During 20 years, refining has been the weak link of the petroleum industry. This sector has always suffered from a chronical overcapacity. Today, on the contrary, there is a lack of facilities and shortage is threatening. The Reichstett refinery (Alsace, France) is the smallest French refinery. It has been several times threatened with closure but today, thanks to the increasing demand, it works at full capacity. This short paper summarizes the history of this facility and its social and environmental impact in the region. (J.S.)

  7. Outage capacity of multicarrier systems

    KAUST Repository

    Yilmaz, Ferkan

    2010-01-01

    The probability density function and the cumulative distribution function of the product of shifted Gamma variates are obtained in terms of the generalized Fox\\'s H function. Using these new results, the exact outage capacity of multi carrier transmission through a slow Nakagami-m fading channel is presented. Moreover, it is shown that analytical and simulation results are in perfect agreement. © 2009 IEEE.

  8. Activities of maintenance and outage

    International Nuclear Information System (INIS)

    Gracia-Orellan, J. M.; Gonzalez, P. L.; Verdu, M. F.; Fernandez, J. A.

    2004-01-01

    Iberinco Nuclear Generation Department have wanted to promote service activities in nuclear power plants for years besides its dedication to engineering activities. for it, in 1997 Nuclear Services Management was created to complement engineering activities and to be able to make an offer for products and turn key services. People involved in this Management have an extensive experience in Services Area, so that all type of maintenance works are promoted, as well other services like dismantling, fallout management and new equipment's for nuclear power plants services. Iberinco's experience in Support Services in Nuclear Power Plants allows to answer effectively to special workers during operation cycle and outages periods. These activities have been made in spanish nuclear power plants and Angra I and II plants, both of them in Brazil. In this area we provide Technical Consulting Management and Supervision to develop the following activities: - Improvement Maintenance Programs based in PSA: Implantation of Maintenance Rule in the plants. - Supervision and Assembly of design modifications in structures, systems and components. - Fulfilment of efficiency tests, inspection and turbo-group modification. - Noise and vibrations analysis. - Valves and rotative equipment calculations and diagnosis tests. Iberinco develop these outage activities itself or as contractors coordinator under its management. A lot of them have been working with Iberinco for many years and have a great experience in the Service Area they are developing. In this article, the main outage activities developed for Iberinco are detailed. (Author)

  9. World class performance: the outage/operating cycle continuum

    Energy Technology Data Exchange (ETDEWEB)

    Remphal, M. [Ontario Power Generation, Darlington, Ontario (Canada)

    2011-07-01

    It's all about Performance! Predictable and sustainable high performance is the key to public and stakeholder confidence in the nuclear industry. Why? Because nuclear is unique and safe, reliable operation each and every day is required to keep public trust. What better way to demonstrate this predictability than in breaker to breaker operating runs? Delivering on what was promised is the essence of our OPG accountability model: 'Say it, Do it'. This presentation is drawn from practical experience gained during the most recent planned maintenance outages at Darlington Nuclear. Key elements for outage success that will be discussed include; Human Performance: Ensuring each action is deliberate and executed right the first time; Continuous Learning: Recent examples demonstrating how drawing from lessons learned and operating experience worldwide can dramatically improve outage performance; Teamwork and Partnership: Recognizing our industry is too complex for a single; individual or organization to run on its own; Scope Selection: Darlington currently has an industry leading 0.5% Forced Loss Rate (FLR). If right work is selected and executed at the right time then ultimately the plant speaks and it shows up in low FLR and high Nuclear Performance Index; Planning: Ask and anticipate what can go wrong, what options exist and then pre-decide what path you would take. Some practical tools will be provided which have been recently used to plan out surprises; Oversight: An outage left to run its own course will have a surprise outcome. Strong management oversight is required to meet the goals of outage execution. Tips on how to improve communication and accountability will be discussed. Trust is built on confidence and confidence is built on sustainable performance. World class sustainable performance requires using all the tools available. This discussion will provide insight on these very tools. (author)

  10. World class performance: the outage/operating cycle continuum

    International Nuclear Information System (INIS)

    Remphal, M.

    2011-01-01

    It's all about Performance! Predictable and sustainable high performance is the key to public and stakeholder confidence in the nuclear industry. Why? Because nuclear is unique and safe, reliable operation each and every day is required to keep public trust. What better way to demonstrate this predictability than in breaker to breaker operating runs? Delivering on what was promised is the essence of our OPG accountability model: 'Say it, Do it'. This presentation is drawn from practical experience gained during the most recent planned maintenance outages at Darlington Nuclear. Key elements for outage success that will be discussed include; Human Performance: Ensuring each action is deliberate and executed right the first time; Continuous Learning: Recent examples demonstrating how drawing from lessons learned and operating experience worldwide can dramatically improve outage performance; Teamwork and Partnership: Recognizing our industry is too complex for a single; individual or organization to run on its own; Scope Selection: Darlington currently has an industry leading 0.5% Forced Loss Rate (FLR). If right work is selected and executed at the right time then ultimately the plant speaks and it shows up in low FLR and high Nuclear Performance Index; Planning: Ask and anticipate what can go wrong, what options exist and then pre-decide what path you would take. Some practical tools will be provided which have been recently used to plan out surprises; Oversight: An outage left to run its own course will have a surprise outcome. Strong management oversight is required to meet the goals of outage execution. Tips on how to improve communication and accountability will be discussed. Trust is built on confidence and confidence is built on sustainable performance. World class sustainable performance requires using all the tools available. This discussion will provide insight on these very tools. (author)

  11. Practice of fuel management and outage strategy at Paks NPP

    International Nuclear Information System (INIS)

    Farago, P.; Hamvas, I.; Szecsenyi, Zs.; Nemes, I.; Javor, E.

    2000-01-01

    The Paks Nuclear Power Plant generates almost 40% of Hungarian electricity production at lowest price. In spite of this fact the reduction of operational and maintenance costs is one of the most important goal of the plant management. The proper fuel management and outage strategy can give a considerable influence for this cost reduction. The aim of loading pattern planning is to get the required cycle length with available fuel cassettes and to keep all key parameters of safety analysis under safety limits. Another important point is production at profit, where both the fuel and spent fuel cost are determining. Earlier the conditions given by our only fuel supplier restricted our possibilities, so at the beginning the fuel arrangement changing was the only way to improve efficiency of fuel using. As first step we introduced the low leakage core design. The next step was the 4 years cycle using of some cassettes. By this way nearly half of 3 years cycle old cassettes remained in the core for fourth cycle. In the immediate future we want to use profiled cassettes developed by Russian supplier. Simultaneously we will load new type of WWER cassettes with burnable poison developed by BNFL Company. Hereby we can apply more BNFL cassettes for four years cycle even more. Both cost of fuel and number of spent fuel can be reduced besides keeping parameters under safety limits. The Hungarian in service inspection rules determine that every four year we have to make a complete inspection of reactor vessel. Therefore earlier we had two types of outages. Every 4 years we planned a long outage with 55-65 days duration and normal ones with about 30-35 days duration between the long ones. During the normal outages this way did not give us enough room to utilise the shortest possible critical path determined by works on reactor. Some years ago we changed our outage strategy. Now we plan every 4 years a long outage, and between them one normal and two short ones. As a result the

  12. Maximizing petrochemicals from refineries

    Energy Technology Data Exchange (ETDEWEB)

    Glover, B.; Foley, T.; Frey, S. [UOP, Des Plaines, IL (United States)

    2007-07-01

    New fuel quality requirements and high growth rates for petrochemicals are providing both challenges and opportunities for refineries. A key challenge in refineries today is to improve of the value of the products from the FCC unit. In particular, light FCC naphtha and LCO are prime candidates for improved utilization. Processing options have been developed focusing on new opportunities for these traditional fuel components. The Total Petrochemicals/UOP Olefin Cracking Process cracks C4-C8 olefins to produce propylene and ethylene. This process can be integrated into FCC units running at all severity levels to produce valuable light olefins while reducing the olefin content of the light FCC naphtha. Integration of the Olefin Cracking Process with an FCC unit can be accomplished to allow a range of operating modes which can accommodate changing demand for propylene, cracked naphtha and alkylate. Other processes developed by UOP allow for upgrading LCO into a range of products including petrochemical grade xylenes, benzene, high cetane diesel and low sulfur high octane gasoline. Various processing options are available which allow the products from LCO conversion to be adjusted based on the needs and opportunities of an individual refinery, as well as the external petrochemical demand cycles. This presentation will examine recent refining and petrochemical trends and highlight new process technologies that can be used to generate additional revenue from petrochemical production while addressing evolving clean fuel demands. (orig.)

  13. Options for shortening nuclear power plant refueling outages

    International Nuclear Information System (INIS)

    Kastl, H.

    2001-01-01

    Deregulation of the European electricity market on 01.01.1999 forced a large number of electric utilities- especially nuclear power plant operators - to find ways of drastically cutting down their costs in order to be able to compete successfully within the new market environment. Nuclear power plants currently in operation mainly have three potential ways of reducing their power generating costs: by increasing plant availability, reducing fuel costs and cutting down operating costs. The optimization of plant refueling outages offers considerable potential for enhancing plant availability, but also helps bring down operating costs by reducing expenditure on maintenance. In order to optimize an outage in terms of its duration and costs, a variety of approaches are possible - all of which, however, involve certain key factors such as good organization, planning, logistics and control, improvement of equipment and tools, as well as motivation of personnel. Another aspect is the introduction of innovative technologies. In the last few years, such technologies have frequently enabled maintenance effort to be reduced, thus saving considerable time, and have also resulted in a need for fewer personnel to carry out the work, thus reducing radiation exposure. In many instances they have also improved the quality of work and outage performance as a whole. The paper uses recent examples to show how innovative technologies can contribute to-wards reducing nuclear plant maintenance costs and shorten the duration of refueling out-ages. (author)

  14. Study of Arkansas Nuclear One-1 13th refueling outage

    International Nuclear Information System (INIS)

    Hashiba, Takashi

    1997-01-01

    Recently performance of nuclear power plants in the USA has improved remarkably. Their average automatic shutdown rate has been sharply dropping, although it is still higher than that in Japan, and their average capacity factor has become higher than that in Japan in recent years. One of the main contributors is an extension of the operational period, and another is a shortening of refueling-outage time. It is considerably difficult to have accomplished both the improvement of plant reliability and shortening of refueling-outage time because their refueling outage corresponds to our periodical inspection which is central to maintenance activities in Japanese plants. In order to learn how they have been achieved, a visit to Arkansas Nuclear One-1 (ANO-1) which obtained the top-class result of SALP (Systematic Assessment of Licensee Performance) performed by the Nuclear Regulatory Commission was planned and study of their 13th refueling outage was carried out. Their achievements result from performance-base maintenance and on-line maintenance, based on a proper preventive maintenance program, and untiring efforts of efficiency improvement, represented by the introduction of several on-line systems. And the reason behind this is severe competition concerning power generation cost reduction. (author)

  15. Study of Arkansas Nuclear One-1 13th refueling outage

    Energy Technology Data Exchange (ETDEWEB)

    Hashiba, Takashi [Institute of Nuclear Safety System Inc., Seika, Kyoto (Japan)

    1997-09-01

    Recently performance of nuclear power plants in the USA has improved remarkably. Their average automatic shutdown rate has been sharply dropping, although it is still higher than that in Japan, and their average capacity factor has become higher than that in Japan in recent years. One of the main contributors is an extension of the operational period, and another is a shortening of refueling-outage time. It is considerably difficult to have accomplished both the improvement of plant reliability and shortening of refueling-outage time because their refueling outage corresponds to our periodical inspection which is central to maintenance activities in Japanese plants. In order to learn how they have been achieved, a visit to Arkansas Nuclear One-1 (ANO-1) which obtained the top-class result of SALP (Systematic Assessment of Licensee Performance) performed by the Nuclear Regulatory Commission was planned and study of their 13th refueling outage was carried out. Their achievements result from performance-base maintenance and on-line maintenance, based on a proper preventive maintenance program, and untiring efforts of efficiency improvement, represented by the introduction of several on-line systems. And the reason behind this is severe competition concerning power generation cost reduction. (author)

  16. Outage risk reduction at Diablo Canyon

    International Nuclear Information System (INIS)

    Burnett, Tobias W.T.; Eugene Newman, C.

    2004-01-01

    A formal risk reduction program was conducted at the Diablo Canyon Nuclear Generating plant as part of EPRI's Outage Risk Assessment and Management Program. The program began with a probabilistic and deterministic assessment of the frequency of core coolant boiling and core uncovery during shutdown operations. This step identified important contributors to risk, periods of high vulnerability, and potential mechanisms for reducing risk. Next, recovery strategies were evaluated and procedures, training, and outage schedules modified. Twelve risk reduction enhancements were developed and implemented. These enhancements and their impact are described in this paper. These enhancements reduced the calculated risk of core uncovery by about a factor of four for a refueling outage without lengthening the outage schedule; increased the outage efficiency, contributing to completing 11 days ahead of schedule; and helped to earn the highest achievable SALP rating from the NRC. (author)

  17. Major outage trends in light water reactors. Interim report

    International Nuclear Information System (INIS)

    Burns, E.T.

    1978-04-01

    The report is a summary of the major outages which occurred in light water reactor plants during the period January 1971 through June 1977. Only those outages greater than 100 hours duration (exclusive of refueling outages) are included in the report. The trends in outages related to various reactor systems and components are presented as a function of plant age, and alternatively, calendar year. The principal contributors to major outages are ranked by their effect on the overall outage time for PWRs and BWRs. In addition, the outage history of each operating nuclear plant greater than 150 MWe is presented, along with a brief summary of those outages greater than two months duration

  18. Areva: experiences in outage services

    International Nuclear Information System (INIS)

    Wiemeier, R.; Mueller, N.; Blanco, I. J.

    2010-01-01

    As the world leader in the nuclear industry, Areva is firmly committed to the safe and reliable operation of the Spanish nuclear power plants. Following this commitment, Areva has established the subsidiary Areva NP Services Spain as a local platform to provide nuclear services for the Spanish nuclear power plants. being integrated and supported by the global Areva Group, Areva NP Services Spain is able to offer services solutions to all customers demands while maintaining close and sustainable relationships with them. This integration also allows the Spanish personnel of Areva to employ their skills by working in multinational teams in international projects. This article will present the capacities, and the most important recent national and international project performed by Areva NP Services Spain in the field of outage services. (Author)

  19. Comparison and validation of statistical methods for predicting power outage durations in the event of hurricanes.

    Science.gov (United States)

    Nateghi, Roshanak; Guikema, Seth D; Quiring, Steven M

    2011-12-01

    This article compares statistical methods for modeling power outage durations during hurricanes and examines the predictive accuracy of these methods. Being able to make accurate predictions of power outage durations is valuable because the information can be used by utility companies to plan their restoration efforts more efficiently. This information can also help inform customers and public agencies of the expected outage times, enabling better collective response planning, and coordination of restoration efforts for other critical infrastructures that depend on electricity. In the long run, outage duration estimates for future storm scenarios may help utilities and public agencies better allocate risk management resources to balance the disruption from hurricanes with the cost of hardening power systems. We compare the out-of-sample predictive accuracy of five distinct statistical models for estimating power outage duration times caused by Hurricane Ivan in 2004. The methods compared include both regression models (accelerated failure time (AFT) and Cox proportional hazard models (Cox PH)) and data mining techniques (regression trees, Bayesian additive regression trees (BART), and multivariate additive regression splines). We then validate our models against two other hurricanes. Our results indicate that BART yields the best prediction accuracy and that it is possible to predict outage durations with reasonable accuracy. © 2011 Society for Risk Analysis.

  20. First refinery opened in Kyrgyz Republic

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The first oil refinery in the Kyrgyz Republic was opened on 5 October 1996 in Jalalabad in a ceremony attended by the President of the Central Asian country, Askar Akaev. The 10,000 barrels of oil per day (bopd) modular refinery has been financed by the Canadian oil junior, Kyrgoil Corporation, which has also formed a joint venture with the national oil company, Kyrgyzneft, to redevelop where viable the 628 underperforming oil wells in the Kyrgyz Republic sector of the Fergana Basin. The opening is the first significant milestone in a programme initiated by Akaev to develop the oil production industry in the Kyrgyz Republic. Currently the country imports more than 50,000 barrels of oil equivalent per day, mostly from Kazakhstan. In the year ending March 1996, 110 million was spent on imports of fuel products, an amount that exceeds the trade deficit over the same period. Built in only eight months, the Pound 12 million refinery will gradually be brought to full capacity. By January, it is expected that more than 5,000 barrels of gasoline, diesel and fuel oil will be produced every day. Although there is some crude oil in storage, the ramping of production is tied into the programme of workovers of the existing wells. There are no current plans to import crude, although most of the infrastructure is in place should it become necessary. (author)

  1. Integrated refinery waste management

    Energy Technology Data Exchange (ETDEWEB)

    Shieh, Y -S [ETG Environmental, Inc., Blue Bell, PA (US); Sheehan, W J [Separation and Recovery Systems, Inc., Irvine, CA (US)

    1992-01-01

    In response to the RCRA land ban regulations and TC rule promulgated by the U.S. Federal Environmental Protection Agency (EPA) in 1988-1990, an Integrated Refinery Waste Management (IRWM) program has been developed to provide cost-effective solutions to petroleum industry customers. The goal of IRWM is to provide technology based remediation treatment services to manage sludges and wastewaters generated from the oil refining processes, soils contaminated with petroleum distillates and groundwater contaminated with fuels. Resource recovery, volume reduction and waste minimization are the primary choices to mitigate environmental problems. Oil recovery has been performed through phase separation (such as centrifugation and filtration) and heating of heavy oils. Volume reduction is achieved by dewatering systems such as centrifuges and filter presses, and low temperature thermal treatment. Waste minimization can be accomplished by bioremediation and resource recovery through a cement kiln. (Author).

  2. Fiscal 1999 research report. Basic research for promotion of joint implementation programs (Research on energy saving plan for NORSI Refinery); 1999 nendo NORSI seiyusho sho energy keikaku chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This is a feasibility study desired to connect to a joint implementation program in the future, which plans to modify the oil refining system now in existence at the NORSI Refinery in the Russian Federation. The modification plan for energy efficiency improvement consists of (1) the reconstruction of the heat exchanger network, addition of three high-efficiency heating furnaces, and the introduction of stripping steam into the pre-distillation tower for the atmospheric/vacuum distillation system, (2) the addition of two combined heat exchangers, replacement of the reboiler with a steam reboiler, and the use of reflux line in the deethanization tower for the reforming section of the catalytic reforming unit, and (3) the addition of combined heat exchangers and the installation of two high-efficiency heater furnaces for the hydrodesulfurization unit for kerosene and light oil. The plan requires 40,470,000 dollars, and will save 48,000 tons/year in terms of oil and reduce CO2 emissions by 120,000 tons/year. No settlement has been reached, however, about financing, agreement to cost performance, or apportioning of the amount of reduction in CO2 emissions to the parties involved in case of transfer under a joint implementation program. It is desired that these problems will be solved for the promotion of the project. (NEDO)

  3. San Onofre - the evolution of outage management

    International Nuclear Information System (INIS)

    Slagle, K.A.

    1993-01-01

    With the addition of units 2 and 3 to San Onofre nuclear station in 1983 and 1984, it became evident that a separate group was needed to manage outages. Despite early establishment of a division to handle outages, it was a difficult journey to make the changes to achieve short outages. Early organizational emphasis was on developing an error-free operating environment and work culture. This is difficult for a relatively large organization at a three-unit site. The work processes and decision styles were designed to be very deliberate with many checks and balances. The organization leadership and accountability were focused in the traditional operations, maintenance, and engineering divisions. Later, our organization emphasis shifted to achieving engineering excellence. With a sound foundation of operating and engineering excellence, our organizational focus has turned to achieving quality outages. This means accomplishing the right work in a shorter duration and having the units run until the next refueling

  4. Refueling outage data collection and analysis

    International Nuclear Information System (INIS)

    Harshaw, K.; Quilliam, J.; Brinsfield, W.; Jeffries, J.

    1993-07-01

    This report summarizes the results of an EPRI project to compile an industry generic refueling outage database applicable to alternate (non-full-power) modes of shutdown conditions at nuclear power plants. The project team evaluated five outages at two BWR plants. They obtained data primarily from control room logs, outage schedules, incident reports, and licensee event reports. The team organized the data by outage segment and time line. Due to its small sample size, this study produced no conclusive results related to initiating event frequencies, equipment failure rates, or human reliability estimates during shutdown conditions. However, it pointed out the problems of brief or inconsistent recordkeeping. A too brief record results in difficulty determining if the root cause of an event was mechanical or the result of human performance. Retrieval of data can be difficult and labor-intensive. There is a clear need for better, more comprehensive documentation

  5. The four ''Ps'' of outage management

    International Nuclear Information System (INIS)

    Kuehn, S.E.

    1996-01-01

    This article describes how planning, partnering, preparation and people prevent poor outage performance. Boasting the best production costs in a decade, the US fleet of nuclear reactors is performing better than ever. Industry wide, production costs fell 7% to $20.02 per net megawatt hour (MWh) and output climbed 3% to 634million MWh. It doesn't take a nuclear physicists to realize that when base-loaded nuclear units are operated for long periods of time, near their technical potential, costs will fall and relative performance improves. Statistics for 1994 compiled by the Institute of Nuclear Operations (INPO) and the World Association of Nuclear Operators (WANO) showed the industry has steadily improved in most of the 10 industry-recognized categories. In 1994, Unit Capability Factor (the percentage of maximum energy generation a plant can supply to the grid) reached just under 82%, beating the 1995 goal and proving just how far the industry has come (62.7% in 1980) when improving plant operations

  6. Partnership - its contribution to outage success

    International Nuclear Information System (INIS)

    Gill, K.S.; Kirton-Darling, F.; Robinson, F.T.

    1996-01-01

    An innovative approach to developing the teamwork between the power station and the outage contractor has been pioneered over the past three years at the Bradwell nuclear power station in the UK, which houses two Magnox reactors. Magnox Electric and Rolls-Royce Nuclear Engineering Services are now undertaking their third outage under a partnership contract which has provided significant benefits to both parties. (Author)

  7. Outages 1999 and 2000, investments in safety and long-term operation of NE Krsko

    International Nuclear Information System (INIS)

    Sirola, P.; Krajnc, J.; Androjna, F.

    1999-01-01

    Plant outage is an important part of nuclear power plant operation. During that time the conditions are established for the performance of specific activities, such as refueling, tests, inspections, preventive and corrective maintenance and modifications, that are intended to confirm proper condition and availability of safety and other important components and improve overall plant safety and reliability. It is well know that in Nuclear Power Plant Krsko (Nuklearna elektrarna Krsko NEK) during Outage 2000 new Steam Generators (SGs) will be placed in service, while Outage '99 was used for preparatory works. But the importance of those two outages is even greater, because they are implementing a broad number of improvements and establishing a basis for long-term plant operation. Outage '99 required very detailed planning to assure a good control over the outage activities and operational plant systems necessary for safe shutdown. Numerous activities took place in a relatively narrow space in the Reactor Building. Some of these activities will have a big significance for the future. The article treats the status update and summarizes the specifics and importance of the mentioned activities to long-term plant safe and reliable operation.(author)

  8. Commercial operation and outage experience of ABWR at Kashiwazaki-Kariwa units Nos. 6 and 7

    International Nuclear Information System (INIS)

    Anahara, N.; Yamada, M.; Kataoka, H.

    2000-01-01

    drums and that of unit No. 3. Overhaul and inspection of new designs components, such as reactor internal pumps (RIPs), advanced type control rod drive mechanism (FMCRD) and large-capacity and high-efficiency turbine system, were conducted as planned, verifying their integrity after the commercial operation period. Operability during annual outage through ABWR-type main control room panels, which have a very new man-machine interface with touch-screen CRTs and flat displays, was also confirmed. In this paper, the commercial operation and annual outage experience of Kashiwazaki-Kariwa Nuclear Power Station units Nos. 6 and 7 are reported. (author)

  9. Integrated outage management: Leveraging utility system assets including GIS and AMR for optimum outage response

    Energy Technology Data Exchange (ETDEWEB)

    Finamore, E. P.

    2004-02-01

    The control of electrical system outages is discussed. The principal argument advanced is that traditional stand-alone methods of outage response will no longer get the job done without utility companies integrating their outage management systems with other system assets such as GIS (geographic information system) and AMR (advanced metering systems). Many meter reading systems, while primarily supporting customer billing, can also provide outage alarm and some are also capable of service restoration notification, which is an invaluable benefit to service operators since it obviates the need for verifying system restoration by labour-intensive on-site visits or customer call-backs. If successfully leveraged, optimization of all utility assets and improvements in labour productivity can results in improved outage management performance gains without affecting performance in other areas.

  10. Ashland outlines $261 million in refinery unit construction

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Ashland Petroleum Co. has spelled out $261 million in projects completed, under way, or planned to produce cleaner fuel and further reduce emissions at two U.S. refineries. The company: Started up at $13 million pollution control system at its 213,400 b/cd Catlettsburg, Ky., plant. Started construction on six projects at its 67,100 b/cd St. Paul Park, Minn., refinery that will cost about $114 million and enable the plant to produce cleaner burning diesel fuel and further reduce emissions

  11. Contingency Analysis of Cascading Line Outage Events

    Energy Technology Data Exchange (ETDEWEB)

    Thomas L Baldwin; Magdy S Tawfik; Miles McQueen

    2011-03-01

    As the US power systems continue to increase in size and complexity, including the growth of smart grids, larger blackouts due to cascading outages become more likely. Grid congestion is often associated with a cascading collapse leading to a major blackout. Such a collapse is characterized by a self-sustaining sequence of line outages followed by a topology breakup of the network. This paper addresses the implementation and testing of a process for N-k contingency analysis and sequential cascading outage simulation in order to identify potential cascading modes. A modeling approach described in this paper offers a unique capability to identify initiating events that may lead to cascading outages. It predicts the development of cascading events by identifying and visualizing potential cascading tiers. The proposed approach was implemented using a 328-bus simplified SERC power system network. The results of the study indicate that initiating events and possible cascading chains may be identified, ranked and visualized. This approach may be used to improve the reliability of a transmission grid and reduce its vulnerability to cascading outages.

  12. Partnership - the heart of integrated outage management

    International Nuclear Information System (INIS)

    Robinson, F.T.

    1995-01-01

    Changes in the power generating industry continue apace. The effects of privatisation are widely visible: nowhere more so than in the growing national and international competition facing the generators around the world. A successful, long-term marriage between generator and contractor on power station outage management offers significant scope for cost reduction, shortening annual plant downtime and generating more megawatts, all within a safety environment of continuous improvement. Working in close partnership, Nuclear Electric and Rolls-Royce Nuclear Engineering Services have remodelled the whole contractor/client strategy. The new discipline, known as integrated outage management and partnering, is already producing shorter outage periods at Bradwell, a Magnox Station in Essex. (author)

  13. Benchmarking of refinery emissions performance : Executive summary

    International Nuclear Information System (INIS)

    2003-07-01

    This study was undertaken to collect emissions performance data for Canadian and comparable American refineries. The objective was to examine parameters that affect refinery air emissions performance and develop methods or correlations to normalize emissions performance. Another objective was to correlate and compare the performance of Canadian refineries to comparable American refineries. For the purpose of this study, benchmarking involved the determination of levels of emission performance that are being achieved for generic groups of facilities. A total of 20 facilities were included in the benchmarking analysis, and 74 American refinery emission correlations were developed. The recommended benchmarks, and the application of those correlations for comparison between Canadian and American refinery performance, were discussed. The benchmarks were: sulfur oxides, nitrogen oxides, carbon monoxide, particulate, volatile organic compounds, ammonia and benzene. For each refinery in Canada, benchmark emissions were developed. Several factors can explain differences in Canadian and American refinery emission performance. 4 tabs., 7 figs

  14. Benchmark Report on Key Outage Attributes: An Analysis of Outage Improvement Opportunities and Priorities

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Laboratory (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Laboratory (INL), Idaho Falls, ID (United States)

    2014-09-01

    Advanced Outage Control Center (AOCC), is a multi-year pilot project targeted at Nuclear Power Plant (NPP) outage improvement. The purpose of this pilot project is to improve management of NPP outages through the development of an AOCC that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report documents the results of a benchmarking effort to evaluate the transferability of technologies demonstrated at Idaho National Laboratory and the primary pilot project partner, Palo Verde Nuclear Generating Station. The initial assumption for this pilot project was that NPPs generally do not take advantage of advanced technology to support outage management activities. Several researchers involved in this pilot project have commercial NPP experience and believed that very little technology has been applied towards outage communication and collaboration. To verify that the technology options researched and demonstrated through this pilot project would in fact have broad application for the US commercial nuclear fleet, and to look for additional outage management best practices, LWRS program researchers visited several additional nuclear facilities.

  15. Energy use in petroleum refineries

    Energy Technology Data Exchange (ETDEWEB)

    Haynes, V.O.

    1976-09-01

    Refining petroleum accounts for about 4 percent of the total energy consumed in the United States and about 15 percent of all industrial consumption. The kinds of energy used and the manner in which energy is used are discussed on a process-by-process basis. Emphasis is placed on existing processes to identify and quantify process and equipment substitutions which might significantly conserve energy. General industry and process information is given and estimates of potential savings are made. A few research and development opportunities are identified and nontechnical factors are discussed. Nearly one-half the energy consumed by refineries is obtained from by-product refinery gas and coke, and about one-third is supplied by natural gas. On a regional basis, refineries were found to vary by a factor of two in the amount of energy used to refine a unit of crude oil. Refineries in regions traditionally abundant in inexpensive natural gas were found to use relatively more natural gas and energy. About 36 percent of the energy used by petroleum refineries is consumed in the distillation units to separate the refinery streams into their basic components. Including energy for manufacturing hydrogen, about 24 percent of the total is used for cracking of the heavier components. Most of the remainder is used for reforming, hydrogen treating, and alkylation, distributed about 11, 17, and 6 percent respectively. Potential energy savings discussed in this report total 61 x 10/sup 13/ Btu/yr based on 1974 capacities, a figure which represents about 20 percent of the energy consumed to refine petroleum.

  16. Standard plants, standard outages: the EdF approach

    International Nuclear Information System (INIS)

    Miron, J.L.

    1991-01-01

    At the end of 1990 Electricite de France had carried out a total of 350 PWR refuelling outages. Although the French units are standardized the routine of the outages are not all the same. The major influences on outages were: setting up new organizations to apply quality assurance regulations; improving systematic experience feedback; incorporating modifications in the outage schedules; assumilation of computerized maintenance management by the sites. (author)

  17. Residential outage cost estimation: Hong Kong

    International Nuclear Information System (INIS)

    Woo, C.K.; Ho, T.; Shiu, A.; Cheng, Y.S.; Horowitz, I.; Wang, J.

    2014-01-01

    Hong Kong has almost perfect electricity reliability, the result of substantial investments ultimately financed by electricity consumers who may be willing to accept lower reliability in exchange for lower bills. But consumers with high outage costs are likely to reject the reliability reduction. Our ordered-logit regression analysis of the responses by 1876 households to a telephone survey conducted in June 2013 indicates that Hong Kong residents exhibit a statistically-significant preference for their existing service reliability and rate. Moreover, the average residential cost estimate for a 1-h outage is US$45 (HK$350), topping the estimates reported in 10 of the 11 studies published in the last 10 years. The policy implication is that absent additional compelling evidence, Hong Kong should not reduce its service reliability. - Highlights: • Use a contingent valuation survey to obtain residential preferences for reliability. • Use an ordered logit analysis to estimate Hong Kong's residential outage costs. • Find high outage cost estimates that imply high reliability requirements. • Conclude that sans new evidence, Hong Kong should not reduce its reliability

  18. Pricing power outages in the Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Baarsma, Barbara E.; Hop, J. Peter [SEO Economic Research/University of Amsterdam, Amsterdam (Netherlands)

    2009-09-15

    In most Western countries, the power grid provides electricity more than 99% of the time. To maintain reliability at such high levels, energy companies have to continually invest in electric transmission- and distribution systems. Since customers of electricity cannot switch from one distribution network to another, no economic incentive exists that matches the supplied reliability to customer preferences. Either under- or over-investment in reliability may thus result. In order to introduce market-like incentives, the Dutch Energy Regulator introduced a regulatory system based on the (perceived) costs of power outages. An essential ingredient of the regulation is the cost of a power outage of a particular duration (i.e., 1 minute). This paper measures these outage cost by using conjoint analysis. We find that the social cost of the present Dutch level of reliability - that is, one outage of two hours every four years - is EUR2.80 on average for every household, and EUR33.10 on average for every SME firm. The total costs to Dutch society are almost EUR50 million. (author)

  19. Cell outage compensation in LTE networks: Algorithms and performance assessment

    NARCIS (Netherlands)

    Amirijoo, M.; Jorguseski, L.; Litjens, R.; Schmelz, L.C.

    2011-01-01

    Cell outage compensation is a self-healing function and as such part of the Self-Organising Networks concept for mobile wireless networks. It aims at mitigating the degradation of coverage, capacity and service quality caused by a cell or site level outage. Upon detection of such an outage, cell

  20. Refineries in Europe under pressure

    International Nuclear Information System (INIS)

    Widdershoven, C.

    2008-01-01

    Current oil price developments and the economic and financial crisis are leading to a negative situation for the European refining sector. Analysts expect that a number of European oil refineries will lower their production in the coming months as a result of decreased petrol demand. [mk] [nl

  1. Hybrid Cascading Outage Analysis of Extreme Events with Optimized Corrective Actions

    Energy Technology Data Exchange (ETDEWEB)

    Vallem, Mallikarjuna R.; Vyakaranam, Bharat GNVSR; Holzer, Jesse T.; Samaan, Nader A.; Makarov, Yuri V.; Diao, Ruisheng; Huang, Qiuhua; Ke, Xinda

    2017-10-19

    Power system are vulnerable to extreme contingencies (like an outage of a major generating substation) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Some cascading outages are seen within minutes following a major contingency, which may not be captured exclusively using the dynamic simulation of the power system. The utilities plan for contingencies either based on dynamic or steady state analysis separately which may not accurately capture the impact of one process on the other. We address this gap in cascading outage analysis by developing Dynamic Contingency Analysis Tool (DCAT) that can analyze hybrid dynamic and steady state behavior of the power system, including protection system models in dynamic simulations, and simulating corrective actions in post-transient steady state conditions. One of the important implemented steady state processes is to mimic operator corrective actions to mitigate aggravated states caused by dynamic cascading. This paper presents an Optimal Power Flow (OPF) based formulation for selecting corrective actions that utility operators can take during major contingency and thus automate the hybrid dynamic-steady state cascading outage process. The improved DCAT framework with OPF based corrective actions is demonstrated on IEEE 300 bus test system.

  2. Power plant and utility performance: how world-record outages are being achieved in the USA

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Two record-breaking refuelling outages at power reactors in the USA are described. The first, at Browns Ferry 3 BWR, was accomplished in 19 days 39 minutes - a shorter time than for an General Electric BWR anywhere in the world hitherto. The management attribute this success to planning, personnel and performance. As well as refuelling, inspections and maintenance, major modifications were carried out. These included the completion of the installation of digital feedwater reactor level control and digital feedwater heater level control. The second outage, at South Texas Project 2 BWR, at 17 days 14 hours and 10 minutes was the fastest yet recorded for any US nuclear unit. This achievement is ascribed to excellent outage preparation and scheduling, the superior condition of the plant equipment and teamwork and safety consciousness on behalf of the plant personnel. Finally, brief consideration is given to the nuclear performance recovery programme of Commonwealth Edison and Ontario Hydro Nuclear. (UK)

  3. Cost of Lightning Strike Related Outages of Visual Navigational Aids at Airports in the United States

    Science.gov (United States)

    Rakas, J.; Nikolic, M.; Bauranov, A.

    2017-12-01

    Lightning storms are a serious hazard that can cause damage to vital human infrastructure. In aviation, lightning strikes cause outages to air traffic control equipment and facilities that result in major disruptions in the network, causing delays and financial costs measured in the millions of dollars. Failure of critical systems, such as Visual Navigational Aids (Visual NAVAIDS), are particularly dangerous since NAVAIDS are an essential part of landing procedures. Precision instrument approach, an operation utilized during the poor visibility conditions, utilizes several of these systems, and their failure leads to holding patterns and ultimately diversions to other airports. These disruptions lead to both ground and airborne delay. Accurate prediction of these outages and their costs is a key prerequisite for successful investment planning. The air traffic management and control sector need accurate information to successfully plan maintenance and develop a more robust system under the threat of increasing lightning rates. To analyze the issue, we couple the Remote Monitoring and Logging System (RMLS) database and the Aviation System Performance Metrics (ASPM) databases to identify lightning-induced outages, and connect them with weather conditions, demand and landing runway to calculate the total delays induced by the outages, as well as the number of cancellations and diversions. The costs are then determined by calculating direct costs to aircraft operators and costs of passengers' time for delays, cancellations and diversions. The results indicate that 1) not all NAVAIDS are created equal, and 2) outside conditions matter. The cost of an outage depends on the importance of the failed system and the conditions that prevailed before, during and after the failure. The outage that occurs during high demand and poor weather conditions is more likely to result in more delays and higher costs.

  4. Feasibility study report for the Imperial Valley Ethanol Refinery: a 14. 9-million-gallon-per-year ethanol synfuel refinery utilizing geothermal energy

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The construction and operation of a 14,980,000 gallon per year fuel ethanol from grain refinery in the Imperial Valley of California is proposed. The Imperial Valley Ethanol Refinery (refinery) will use hot geothermal fluid from geothermal resources at the East Mesa area as the source of process energy. In order to evaluate the economic viability of the proposed Project, exhaustive engineering, cost analysis, and financial studies have been undertaken. This report presents the results of feasibility studies undertaken in geothermal resource, engineering, marketing financing, management, environment, and permits and approvals. The conclusion of these studies is that the Project is economically viable. US Alcohol Fuels is proceeding with its plans to construct and operate the Refinery.

  5. Kozloduy NPP units 5 and 6 modernization program. Measures implementation in outages

    International Nuclear Information System (INIS)

    Naydenov, N.; Mignone, O.

    2004-01-01

    The units 5 and 6 modernization program is a highly demanding program composed by many plant modifications and studies about plant conditions. The program measures implementation during the units outages represents a challenge by the need to compromise shut down duration with the workload related to measures installation. The units shutdown duration should be kept to the planned duration. In parallel, contractors work has to be organized, planned and performed to allow successful measures completion. In accordance with the contract requirements, contractors prepare installation documents which comprise all activities to be performed during the installation and testing of the measures. The subcontractors complement these installation documents with the project organization and execution documents, which include the manpower skills, qualifications, work orders, and other important installation instructions and information. Contractors prepared detailed installation schedules, and these were integrated by Parsons E and C in the Integrated installation schedule. The integrated schedule proved to be useful to identify possible area usage conflicts and manpower overlapping, with appropriate results for electrical, instrumentation and control work, and for the utilization of the polar crane in the containment building. Contractors installation schedules were updated on a weekly basis, showing variances versus the target, and manpower histograms for the resource loading. Organization of contractors work was supported by KNPP plant outage meetings, in which status and problems were addressed, and solution and/or corrective actions defined for further implementation. KNPP meetings were planned on a daily basis for most relevant or critical measures, or on a weekly basis for less intensive measures. KNPP meetings proved to be an excellent communication tool for keeping the measures under control and monitoring KNPP defined personnel responsible for authorizing changes, in

  6. Nuclear safety risk control in the outage of CANDU unit

    International Nuclear Information System (INIS)

    Wu Mingliang; Zheng Jianhua

    2014-01-01

    Nuclear fuel remains in the core during the outage of CANDU unit, but there are still nuclear safety risks such as reactor accidental criticality, fuel element failure due to inability to properly remove residual heat. Furthermore, these risks are aggravated by the weakening plant system configuration and multiple cross operations during the outage. This paper analyzes the phases where there are potential nuclear safety risks on the basis of the typical critical path arrangement of the outage of Qinshan NPP 3 and introduces a series of CANDU-specific risk control measures taken during the past plant outages to ensure nuclear safety during the unit outage. (authors)

  7. Investigation on cause of outage of Wide Range Monitor (WRM) in High Temperature engineering Test Reactor (HTTR). Transport operation toward investigation for cause of outage

    International Nuclear Information System (INIS)

    Shinohara, Masanori; Sawahata, Hiroaki; Kawamoto, Taiki; Saito, Kenji; Takada, Shoji; Yoshida, Naoaki; Isozaki, Ryosuke; Katsuyama, Kozo; Motegi, Toshihiro

    2012-08-01

    An event, in which one of WRMs were disabled to detect the neutron flux in the reactor core, occurred during the period of reactor shut down of HTTR in March, 2010. The actual life time of WRM was unexpectedly shorter than the past developed life time. Investigation of the cause of the outage of WRM toward the recovery of the life time up to the developed life is one of the issues to develop the technology basis of High Temperature Gas cooled Reactor (HTGR). Then, a post irradiation examination was planned to specify the damaged part causing the event in the WRM was also planned. For the investigation, the X-ray computed tomography scanner in Fuels Monitoring Facility (FMF). This report describes the preliminary investigation on the cause of outage of the WRM. The results of study for transportation method of the irradiated WRM from HTTR to FMF is also reported with the record to complete the transport operation. (author)

  8. Advanced Outage and Control Center: Strategies for Nuclear Plant Outage Work Status Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Gregory Weatherby

    2012-05-01

    The research effort is a part of the Light Water Reactor Sustainability (LWRS) Program. LWRS is a research and development program sponsored by the Department of Energy, performed in close collaboration with industry to provide the technical foundations for licensing and managing the long-term, safe and economical operation of current nuclear power plants. The LWRS Program serves to help the US nuclear industry adopt new technologies and engineering solutions that facilitate the continued safe operation of the plants and extension of the current operating licenses. The Outage Control Center (OCC) Pilot Project was directed at carrying out the applied research for development and pilot of technology designed to enhance safe outage and maintenance operations, improve human performance and reliability, increase overall operational efficiency, and improve plant status control. Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Unfortunately, many of the underlying technologies supporting outage control are the same as those used in the 1980’s. They depend heavily upon large teams of staff, multiple work and coordination locations, and manual administrative actions that require large amounts of paper. Previous work in human reliability analysis suggests that many repetitive tasks, including paper work tasks, may have a failure rate of 1.0E-3 or higher (Gertman, 1996). With between 10,000 and 45,000 subtasks being performed during an outage (Gomes, 1996), the opportunity for human error of some consequence is a realistic concern. Although a number of factors exist that can make these errors recoverable, reducing and effectively coordinating the sheer number of tasks to be performed, particularly those that are error prone, has the potential to enhance outage efficiency and safety. Additionally, outage management requires precise coordination of work groups that do not always share similar objectives. Outage

  9. Long-term optimization of outage performance

    International Nuclear Information System (INIS)

    Huemmeler, Alexander; Jakobs, Norbert; Seifert, Siegfried

    2003-01-01

    Deregulation of the power markets and the accompanying pressure on electricity prices have forced all electric utilities to reduce their power generating costs in order to be able to hold their own in the new market environment. This has also particularly affected the operators of nuclear power plants since they have to compete against the lower power generating costs of fossil-fired combined-cycle power plants and, in Germany are faced with a difficult political climate. The areas identified as having the greatest cost-cutting potential were fuel costs, operating costs and measures to increase plant availability. The main objective behind increasing plant availability was not only to improve the already high standard of operational reliability and plant safety even further, but also to significantly shorten the downtime needed for annual refueling outages. A variety of measures aimed at shortening scheduled plant outages have thus been developed and successfully implemented by nuclear plant operators. At the same time, process improvements and new technologies have been introduced by the service providers. Both initiatives together have contributed towards substantially reducing outage time and cost. (author)

  10. Optimization of safety equipment outages improves safety

    International Nuclear Information System (INIS)

    Cepin, Marko

    2002-01-01

    Testing and maintenance activities of safety equipment in nuclear power plants are an important potential for risk and cost reduction. An optimization method is presented based on the simulated annealing algorithm. The method determines the optimal schedule of safety equipment outages due to testing and maintenance based on minimization of selected risk measure. The mean value of the selected time dependent risk measure represents the objective function of the optimization. The time dependent function of the selected risk measure is obtained from probabilistic safety assessment, i.e. the fault tree analysis at the system level and the fault tree/event tree analysis at the plant level, both extended with inclusion of time requirements. Results of several examples showed that it is possible to reduce risk by application of the proposed method. Because of large uncertainties in the probabilistic safety assessment, the most important result of the method may not be a selection of the most suitable schedule of safety equipment outages among those, which results in similarly low risk. But, it may be a prevention of such schedules of safety equipment outages, which result in high risk. Such finding increases the importance of evaluation speed versus the requirement of getting always the global optimum no matter if it is only slightly better that certain local one

  11. How individual traces and interactive timelines could support outage execution - Toward an outage historian concept

    International Nuclear Information System (INIS)

    Parfouru, S.; De-Beler, N.

    2012-01-01

    In the context of a project that is designing innovative ICT-based solutions for the organizational concept of outage management, we focus on the informational process of the OCR (Outage Control Room) underlying the execution of the outages. Informational process are based on structured and unstructured documents that have a key role in the collaborative processes and management of the outage. We especially track the structured and unstructured documents, electronically or not, from creation to sharing. Our analysis allows us to consider that the individual traces produced by an individual participant with a specific role could be multi-purpose and support sharing between participants without creating duplication of work. The ultimate goal is to be able to generate an outage historian, that is not just focused on highly structured information, which could be useful to improve the continuity of information between participants. We study the implementation of this approach through web technologies and social media tools to address this issue. We also investigate the issue of data access through interactive visualization timelines coupled with other modality's to assist users in the navigation and exploration of the proposed historian. (authors)

  12. Environmental determinants of unscheduled residential outages in the electrical power distribution of Phoenix, Arizona

    International Nuclear Information System (INIS)

    Maliszewski, Paul J.; Larson, Elisabeth K.; Perrings, Charles

    2012-01-01

    The sustainability of power infrastructures depends on their reliability. One test of the reliability of an infrastructure is its ability to function reliably in extreme environmental conditions. Effective planning for reliable electrical systems requires knowledge of unscheduled outage sources, including environmental and social factors. Despite many studies on the vulnerability of infrastructure systems, the effect of interacting environmental and infrastructural conditions on the reliability of urban residential power distribution remains an understudied problem. We model electric interruptions using outage data between the years of 2002 and 2005 across Phoenix, Arizona. Consistent with perceptions of increased exposure, overhead power lines positively correlate with unscheduled outages indicating underground cables are more resistant to failure. In the presence of overhead lines, the interaction between birds and vegetation as well as proximity to nearest desert areas and lakes are positive driving factors explaining much of the variation in unscheduled outages. Closeness to the nearest arterial road and the interaction between housing square footage and temperature are also significantly positive. A spatial error model was found to provide the best fit to the data. Resultant findings are useful for understanding and improving electrical infrastructure reliability. - Highlights: ► Unscheduled outages were related to interacting environmental and infrastructural conditions. ► Underground feeders are more resistant to failure. ► In the presence of overhead lines, birds, vegetation, and proximity to desert areas are positive driving factors. ► Proximity to arterial roads and a proxy for energy demand were significantly positive. ► Outages were most spatially dependent up to around 350 m.

  13. Retrofitting refinery and petrochemical plants

    Energy Technology Data Exchange (ETDEWEB)

    Kesler, M.G.

    1988-06-01

    This article focuses on process improvements as the best way to reduce plant energy use. The emphasis on process revamp is well justified, as an energy profile for a typical refinery shows. The diagram shows that 60% of the total heat losses are in water and air cooling. Most of this heat loss results from condensing and cooling in fractionators and recycle systems, intermediate product cooling, and condensing of turbine steam. These losses, of mostly low-level heat, are tied to the basic approach previously used for the process design of existing refineries. Despite the progress to date, there is growing evidence that these heat losses can be further reduced economically by about 20-30% in most refineries and petrochemical plants. One way to reduce the losses is to increase recovery of low-level heat by improved heat exchange, which has been the subject of most publications on plant energy conservation. A better way, presented here, is to develop new process schemes that require less air/water cooling. One useful concept in developing new schemes is to concentrate on heat losses, rather than heat input, as an easier measure of proposed improvements. By an overall heat balance, eliminating a unit of energy loss is equivalent to saving a unit of heat input somewhere in the plant.

  14. Joint refinery selenium treatability study

    International Nuclear Information System (INIS)

    Meyer, C.L.; Folwarkow, S.

    1993-01-01

    The San Francisco Regional Water Quality Control Board recently established mass limits on discharges of selenium to the San Francisco Bay from several petroleum refineries. The refineries had been working independently to develop control strategies, including both source control and treatment options, for removal of selenium from their discharges. By January 1992, over fifty different combinations of treatment technologies, wastewater streams, and pretreatment steps had been investigated to determine their effectiveness and feasibility as selenium removal processes. No treatment process studied could achieve the required mass limits without serious negative environmental consequences, such as generation of large amounts of hazardous sludge. To better facilitate the development of a feasible selenium treatment process, the six Bay Area refineries shared results of their studies and identified several technologies that, with further work, could be developed further. This additional work is currently being carried out as part of a joint selenium treatability study sponsored by the Western States Petroleum Association. A review of the previous source control and treatment studies, along with a description of the current treatability studies will be discussed

  15. Approach to shortening duration of nuclear plant refueling outage

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Yoshiharu; Nakanishi, Tooru [Mitsubishi Heavy Industries Ltd., Kobe (Japan). Kobe Shipyard and Machinery Works; Yoshihara, Seiichi; Kanbara, Masayuki; Yamanaka, Misao; Shimizu, Takeshi

    1998-07-01

    This paper summarizes the mission role of the MHI in-house project team for a shorter outage duration for PWR plants operating in Japan and its results. The major tasks of project team are benchmarking to develop outage performance goals, and develop recommendation packages for outage enhancement covering field procedures and tooling betterment. An optimization study for maintenance tasks was also carried out. This paper highlights the results of efforts the activities of the project team. (author)

  16. Mild Biomass Liquefaction Process for Economic Production of Stabilized Refinery-Ready Bio-oil

    Energy Technology Data Exchange (ETDEWEB)

    Gangwal, Santosh [Southern Research, Durham, NC (United States); Meng, Jiajia [Southern Research, Durham, NC (United States); McCabe, Kevin [Southern Research, Durham, NC (United States); Larson, Eric [Princeton Univ., NJ (United States). Princeton Environmental Inst.; Mastro, Kelly [Southern Research, Durham, NC (United States)

    2016-04-25

    Southern Research (SR) in cooperation with U.S. Department of Energy (DOE), Bioenergy Technology Office (BETO), investigated a biomass liquefaction process for economic production of stabilized refinery-ready bio-oil. The project was awarded by DOE under a Funding Opportunity Announcement (DE-FOA-0000686) for Bio-oil Stabilization and Commoditization that intended to evaluate the feasibility of using bio-oil as a potential feedstock in an existing petroleum refinery. SR investigated Topic Area 1 of the FOA at Technology Readiness Level 2-3 to develop thermochemical liquefaction technologies for producing a bio-oil feedstock from high-impact biomass that can be utilized within a petroleum refinery. Bio-oil obtained from fast pyrolysis of biomass is a green intermediate that can be further upgraded into a biofuel for blending in a petroleum refinery using a hydro-deoxygenation (HDO) route. Co-processing pyrolysis bio-oil in a petroleum refinery is an attractive approach to leverage the refinery’s existing capital. However, the petroleum industry is reluctant to accept pyrolysis bio-oil because of a lack of a standard definition for an acceptable bio-oil feedstock in existing refinery processes. Also per BETO’s multiyear program plan, fast pyrolysis-based bio-fuel is presently not cost competitive with petroleum-based transportation fuels. SR aims to develop and demonstrate a cost-effective low-severity thermal liquefaction and hydrodeoxygenation (HDO) process to convert woody biomass to stabilized bio-oils that can be directly blended with hydrotreater input streams in a petroleum refinery for production of gasoline and/or diesel range hydrocarbons. The specific project objectives are to demonstrate the processes at laboratory scale, characterize the bio-oil product and develop a plan in partnership with a refinery company to move the technology towards commercialization.

  17. Bingham Pump Outage Pits: Environmental information document

    International Nuclear Information System (INIS)

    Pekkala, R.O.; Jewell, C.E.; Holmes, W.G.; Marine, I.W.

    1987-03-01

    Seven waste sites known as the Bingham Pump Outage Pits located in areas of the Savannah River Plant (SRP) received solid waste containing an estimated 4 Ci of low-level radioactivity in 1957-1958. These sites were subsequently backfilled and have been inactive since that time. Most of the radioactivity at the Bingham Pump Outage Pits has been eliminated by radioactive decay. A total of approximately 1 Ci of activity (primarily 137 Cs and 90 Sr) is estimated to remain at the seven sites. The closure options considered for the Bingham Pump Outage Pits are waste removal and closure, no waste removal and closure, and no action. The predominant pathways for human exposure to chemical and/or radioactive constituents are through surface, subsurface, and atmospheric transport. Modeling calculations were made to determine the risks to human population via these general pathways for the three postulated closure options. An ecological assessment was conducted to predict the environmental impacts on aquatic and terrestrial biota. The relative costs for each of the closure options were estimated. Evaluation indicates that the relative human health risks for all closure options are small. The greatest public risk would occur after the waste site was released to unrestricted public use (assumed to occur in Year 2085) via the groundwater pathway to a well. The cost estimates show that the waste removal and closure option is the most expensive (89.6 million dollars). The cost of the no waste removal and the no action options is $800,000. 35 refs., 26 figs., 47 tabs

  18. Unit availability not affected by extending outage cycles

    Energy Technology Data Exchange (ETDEWEB)

    Smith, D.J.

    2003-03-01

    To improve their economic dispatch position, more and more plant owners are extending the intervals between major outages for boilers from one year to 18-24 months and for steam turbine up to 12 years. In many instances, extended outage cycles have resulted in no loss in availability or increases in forced outages. The article discusses outage scheduling at Tucson Electric Power's Springville coal-fired plant, the Panther Creek Energy Facility in Pennsylvania, and at Tennessee Valley Authority's coal-fired power plants. 1 fig.

  19. The prospects for refinery profitability

    Energy Technology Data Exchange (ETDEWEB)

    Weale, G. [European Energy Services, London (United Kingdom)

    1997-05-01

    The outlook for the European refining industry is assessed. The conclusion reached is that the industry is struggling for its existence. Over time, an unsatisfactory balance has grown between refinery capacity and market volumes. High exit barriers have prevented capacity being considerably lower than it is. In the future, a typical integrated oil company might be content to confine itself to retailing oil products without having to refine them. Given the reduction in gasoline demand in particular, it can be expected that 20-25% of capacity will be sold off in the next 15 years and much of it will be closed. (Author)

  20. Bioremediation of petroleum refinery effluent by Planococcus ...

    African Journals Online (AJOL)

    In the present investigation, Planococcus halophilus was screened for hydrocarbon degradation and bioremediation of refinery effluent. The test organism, P. halophilus, showed the capability to utilize kerosene as carbon source in minimal medium. Biological treatment of the refinery effluent with P. halophilus reduced the ...

  1. Aspects of petrochemistry in a fuels refinery

    Energy Technology Data Exchange (ETDEWEB)

    Esser, J.; Mielicke, C.J.; Maier, T. [MIRO - Mineraloelraffinerie Oberrhein GmbH und Co. KG, Karlsruhe (Germany)

    2007-07-01

    Classical links between refinery and petrochemical downstream operations are light naphtha, C2-C4-Olefins and various aromatic compounds. Additionally long chain paraffines from dewaxing or even heavy residues can be interesting starting materials for petrochemistry. Some aspects of these links between refining and petrochemistry as well as their impact on refinery operation and product pools are discussed. (orig.)

  2. Bio-refinery approach for spent coffee grounds valorization.

    Science.gov (United States)

    Mata, Teresa M; Martins, António A; Caetano, Nídia S

    2018-01-01

    Although normally seen as a problem, current policies and strategic plans concur that if adequately managed, waste can be a source of the most interesting and valuable products, among which metals, oils and fats, lignin, cellulose and hemicelluloses, tannins, antioxidants, caffeine, polyphenols, pigments, flavonoids, through recycling, compound recovery or energy valorization, following the waste hierarchy. Besides contributing to more sustainable and circular economies, those products also have high commercial value when compared to the ones obtained by currently used waste treatment methods. In this paper, it is shown how the bio-refinery framework can be used to obtain high value products from organic waste. With spent coffee grounds as a case study, a sequential process is used to obtain first the most valuable, and then other products, allowing proper valorization of residues and increased sustainability of the whole process. Challenges facing full development and implementation of waste based bio-refineries are highlighted. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Pemex to acquire interest in Shell Texas refinery

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This paper reports that Petroleos Mexicanos and Shell Oil Co. have signed a memorandum of understanding to form a joint refining venture involving Shell's 225,000 b/d Deer Park, Tex., refinery. Under the agreement, Mexico's state owned oil company is to purchase a 50% interest in the refinery, and Shell is to sell Pemex unleaded gasoline on a long term basis. Under the venture, Shell and Pemex plan to add undisclosed conversion and upgrading units tailored to process heavy Mexican crude. The revamp will allow Pemex to place more than 100,000 b/d of Mayan heavy crude on the U.S. market. Mayan accounts for 70% of Mexico's crude oil exports. In turn, Shell will sell Pemex as much as 45,000 b/d of unleaded gasoline to help meet Mexico's rapidly growing demand

  4. Outage analysis of blind cooperative diversity

    KAUST Repository

    Tourki, Kamel; Alouini, Mohamed-Slim

    2011-01-01

    Mobile users with single antennas can still take advantage of spatial diversity through cooperative space-time-encoded transmission. In this paper, we considered a scheme in which a relay chooses to cooperate only if its source-relay channel is of an acceptable quality, and we evaluate the usefulness of relaying when the source acts blindly and ignores the decision of the relays whether they may cooperate or not. In our study, we consider the regenerative relays in which the decisions to cooperate are based on a targeted end-to-end data rate R. We derived the end-to-end outage probability for a transmission rate R and a code rate ρ and look at a power allocation strategy between the source and the relays in order to minimize the end-to-end outage probability at the destination for high signal-to-noise ratio, by using the golden section search method. Performance results show that the computer simulations-based results coincide with our analytical results. Copyright © 2011 John Wiley & Sons, Ltd.

  5. Outage analysis of blind cooperative diversity

    KAUST Repository

    Tourki, Kamel

    2011-06-06

    Mobile users with single antennas can still take advantage of spatial diversity through cooperative space-time-encoded transmission. In this paper, we considered a scheme in which a relay chooses to cooperate only if its source-relay channel is of an acceptable quality, and we evaluate the usefulness of relaying when the source acts blindly and ignores the decision of the relays whether they may cooperate or not. In our study, we consider the regenerative relays in which the decisions to cooperate are based on a targeted end-to-end data rate R. We derived the end-to-end outage probability for a transmission rate R and a code rate ρ and look at a power allocation strategy between the source and the relays in order to minimize the end-to-end outage probability at the destination for high signal-to-noise ratio, by using the golden section search method. Performance results show that the computer simulations-based results coincide with our analytical results. Copyright © 2011 John Wiley & Sons, Ltd.

  6. Emergency Response Program Designing Based On Case Study ERP Regulations In Ilam Gas Refinery

    Directory of Open Access Journals (Sweden)

    Mehdi Tahmasbi

    2015-08-01

    Full Text Available The study of Emergency response plan designing is one of the most important prevention approaches in crisis management. This study aims to design emergency response plan based on case study ERP regulations in Ilam gas refinery. On the basis of risk assessment and identification techniques such as HAZOP and FMEA in Ilam gas refinery the risks have been prioritized and then according to this prioritization the design of possible scenarios which have the highest rate of occurrence and the highest level of damage has been separated. Possible scenarios were simulated with PHAST software. Then emergency response program has been designed for the special mode or similar cases. According to the internal emergency response plan for Ilam gas refinery and predictable conditions of the process special instructions should be considered at the time of the incident to suffer the least damage on people and environment in the shortest time possible.

  7. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  8. Development of Improved Graphical Displays for an Advanced Outage Control Center, Employing Human Factors Principles for Outage Schedule Management

    International Nuclear Information System (INIS)

    St Germain, Shawn Walter; Farris, Ronald Keith; Thomas, Kenneth David

    2015-01-01

    The long-term viability of existing nuclear power plants in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are somewhat challenging to coordinate; therefore, finding ways to improve refueling outage performance, while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center (AOCC) project is a research and development (R&D) demonstration activity under the LWRS Program. LWRS is an R&D program that works closely with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current fleet of NPPs. As such, the LWRS Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, INL is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. The overall focus is on developing an AOCC with the following capabilities that enables plant and OCC staff to; Collaborate in real-time to address emergent issues; Effectively communicate outage status to all workers involved in the outage; Effectively communicate discovered conditions in the field to the OCC; Provide real-time work status; Provide automatic pending support notifications

  9. World-class outage performance of the Olkiluoto nuclear power plant

    International Nuclear Information System (INIS)

    Paavola, M.

    1998-01-01

    The production of the Olkiluoto power plant units covered 17% of the electricity consumption in Finland in 1997; the total share of nuclear energy was 27% of the electricity consumed in the country. Based on Finnish experience, nuclear energy is a safe, environmentally friendly and economic way to produce electricity provided that the plants and their personnel are well taken care of. TVO's policy is to keep the plant units in good condition and technically modern. This requires continuous investments in the plant. In maintenance, attention is paid to monitoring the condition of the plant and to preventive maintenance aiming at avoiding disturbances in production. TVO has chosen continuous development as the operational line develops the plant by annual investments and performs the necessary modifications during planned annual outages trying to avoid long production interruptions. The load factors of the Olkiluoto nuclear power plant have been high. The average load factor during the last decade was over 93%. The most significant single factor in the production deficits is the amount or electricity, which has not been produced because of the annual outages. Due to this, special attention has been paid to the performance of the annual outages. TVO aims at continuous development of the annual outage procedure. A centralized task management system makes it possible to perform simultaneously more tasks than before. The company has also invested in equipment and systems, which ease and speed up servicing. Normal outage length varies between 10 and 16 days. By keeping the plant units as modern as possible and in good condition we facilitate reaching TVO's target, which is also stated in TVO's slogan 'always 40 years lifetime'. (author)

  10. Line outage contingency analysis including the system islanding ...

    African Journals Online (AJOL)

    The optimally ordered sparse [Bʹ], [Bʺ] matrices for the integrated system are used for load flow analysis to determine modified values of voltage phase angles [d] and bus voltages [V] to determine the over loading effect on the remaining lines due to outage of a selected line outage contingency. In case of over loading in ...

  11. Analysis of scrams and forced outages at boiling water reactors

    International Nuclear Information System (INIS)

    Earle, R.T.; Sullivan, W.P.; Miller, K.R.; Schwegman, W.J.

    1980-07-01

    This report documents the results of a study of scrams and forced outages at General Electric Boiling Water Reactors (BWRs) operating in the United States. This study was conducted for Sandia Laboratories under a Light Water Reactor Safety Program which it manages for the United States Department of Energy. Operating plant data were used to identify the causes of scrams and forced outages. Causes of scrams and forced outages have been summarized as a function of operating plant and plant age and also ranked according to the number of events per year, outage time per year, and outage time per event. From this ranking, identified potential improvement opportunities were evaluated to determine the associated benefits and impact on plant availability

  12. Utilization of the BR-SIPP systems (Integrated Refinery Scheduling System) at the PETROBRAS Capuava refinery; Utilizacao do sistema BR-SIPP - Sistema Integrado de Programacao de Producao PETROBRAS na refinaria de Capuava

    Energy Technology Data Exchange (ETDEWEB)

    Joly, Marcel [PETROBRAS, Maua, SP (Brazil). Refinaria de Capuava (RECAP). Gerencia de Otimizacao]. E-mail: joly@petrobras.com.br; Hassimotto, Marcelo Kenji [PETROBRAS, Rio de Janeiro, RJ (Brazil). Gerencia de Solucoes de Negocios de Logistica e Planejamento]. E-mail: kenji@petrobras.com.br; Magalhaes, Marcus Vinicius de Oliveira [PETROBRAS, Rio de Janeiro, RJ (Brazil). Gerencia de Otimizacao]. E-mail: vinicius@petrobras.com.br

    2007-04-15

    The BR-SIPP is a production scheduling decision support tool for refineries. It is integrated into the Corporate Inventory, Movements and Quality Data Base and is based on events simulation technology for the elaboration and analysis of scheduling scenarios. Its utilization at the Capuava Refinery allows the production programming team to analyze and anticipate difficulties and opportunities, thereby being able to make viable a potential integration of management and people directly involved with the refinery scheduling information, such as planning, logistics and commercial areas. (author)

  13. Hydrogen management in the MiRO refinery

    Energy Technology Data Exchange (ETDEWEB)

    Neumann, G. [Mineraloelraffinerie Oberrhein GmbH und Co. KG, Karlsruhe (Germany)

    2010-12-30

    The importance of hydrogen in refineries has increased over the last 20 years as new regulations affecting gasoline and diesel composition have been implemented throughout Europe and in an environment of increasingly stringent clean fuel regulations, decreasing heavy fuel oil demand and increasing heavy more sour crude supply. In Germany, the introduction of sulphur free gasoline and diesel with less than 10ppm sulphur(Auto Oil Program) and light home fuel oil with less than 50ppm this year were the last link in a long chain of environmental regulations, which had a considerable effect on the hydrogen demand in refineries. In the complex MiRO-refinery with a large FCC- and Coker-Unit for atmospheric residue conversion and a total throughput of more than 15 Mio.T/ a and more than 14 Mio.T/a crude oils of different origin from high sulphur, bituminous crudes to medium, low sulphur crudes for calcinate-production from green coke the only source of hydrogen for a long time was catalytic reforming. The only chance of balancing the hydrogen production and consumption was to improve the existing catalytic reforming and the optimisation of hydrogen recovery from waste or purge streams and the hydrogen network of the refinery. In 2007 a new hydrogen plant via steam reforming of natural gas went on stream. The main reason for this step was the shrinking market for gasoline in the last ten years and the blending of bio-ethanol into the gasoline pool, which released reforming capacities and the demand for octane. Another important issue is the production planning taking into account the potentials of hydrogen production via catalytic and steam reforming and the hydrogen consumption via desulphurisation and the saturation of olefins and (poly-)aromatics of the main product streams, gasoline, diesel and light home fuel oil. (orig.)

  14. Kvanefjeld refinery pilot plant operations

    International Nuclear Information System (INIS)

    Krebs, Damien; Furfaro, Domenic

    2016-01-01

    Greenland Minerals and Energy is a junior project development company which is listed on the Australian Stock Exchange (asx:GGG). It is developing the Kvanefjeld rare earth and uranium project located in the southern tip of Greenland. The project has completed a Feasibility Study and is currently in the permitting phase. Last year was a busy time for the company as it completed a Feasibility Study, a mining licence application (draft submitted in December 2015) and pilot plant operations. Beneficiation pilot plant operations were completed at GTK in Finland in April 2015. This pilot plant treated approximately 30 tonnes of ore to producing almost 2 tonnes of rare earth mineral concentrate. Later in the year a hydrometallurgical pilot plant was performed which mimicked the Refinery process. This pilot plant was performed at Outotec’s Pori Research laboratories in Finland from September till October 2015. The pilot plant treated approximately 200 kilograms of concentrate over 4 split operating campaigns. Each campaign was performed to focus on the performance of a specific part of the refinery flowsheet. This allowed for full operating focus on a single unit operation to ensure that it was operating correctly. The pilot plant operations were quite successful with no major issues with the flowsheet identified through continuous operation. Some fine tuning of conditions was required to ensure adequate removal of impurities was performed with recycle streams incorporated. Overall the leach extractions observed in the pilot plant exceeded the design assumptions in the Feasibility Study. These programs were partially funded by the EURARE program. The EURARE program aims to encourage the sustainable development of European based rare earth projects. This has the goal of allowing Europe to become less reliant on importation of these key raw materials. The professionalism and performance of both GTK and Outotec contributed significantly to the success of the pilot plant

  15. Mazeikiai refinery woes deepen on all fronts

    Index Scriptorium Estoniae

    2007-01-01

    Leedu rahandusminister teatas, et riigieelarvet mõjutavad probleemid Mazeikiai tehasega, mis on Leedu suurim maksumaksja. Lisa: Russian oil company to build refinery. Surgutneftegaz teatas plaanist ehitada naftatöötlustehas Peterburi lähedale

  16. Outages of electric power supply resulting from cable failures Boston Edison Company system

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    Factual data are provided regarding 5 electric power supply interruptions that occurred in the Boston Metropolitan area during April to June, 1979. Common to all of these outages was the failure of an underground cable as the initiating event, followed by multiple equipment failures. There was significant variation in the voltage ratings and types of cables which failed. The investigation was unable to delineate a single specific Boston Edison design operating or maintenance practice that could be cited as the cause of the outages. After reviewing the investigative report the following actions were recommended: the development and implementation of a plan to eliminate the direct current cable network; develop a network outage restoration plan; regroup primary feeder cables wherever possible to minimize the number of circuits in manholes, and to separate feeders to high load density areas; develop a program to detect incipient cable faults; evaluate the separation of the north and south sections of Back Bay network into separate networks; and, as a minimum, install the necessary facilities to make it possible to re-energize one section without interfering with the other; and re-evaluate the cathodic protection scheme where necessary. (LCL)

  17. Technology Integration Initiative In Support of Outage Management

    Energy Technology Data Exchange (ETDEWEB)

    Gregory Weatherby; David Gertman

    2012-07-01

    Plant outage management is a high priority concern for the nuclear industry from cost and safety perspectives. Often, command and control during outages is maintained in the outage control center where many of the underlying technologies supporting outage control are the same as those used in the 1980’s. This research reports on the use of advanced integrating software technologies and hand held mobile devices as a means by which to reduce cycle time, improve accuracy, and enhance transparency among outage team members. This paper reports on the first phase of research supported by the DOE Light Water Reactor Sustainability (LWRS) Program that is performed in close collaboration with industry to examine the introduction of newly available technology allowing for safe and efficient outage performance. It is thought that this research will result in: improved resource management among various plant stakeholder groups, reduced paper work, and enhanced overall situation awareness for the outage control center management team. A description of field data collection methods, including personnel interview data, success factors, end-user evaluation and integration of hand held devices in achieving an integrated design are also evaluated. Finally, the necessity of obtaining operations cooperation support in field studies and technology evaluation is acknowledged.

  18. Refinery siting workbook: appendices A and B

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    The objective of this effort is to develop and provide basic refinery-related information for use by state and local government officials as a basis for establishing responsible refinery siting requirements and policies consistent with the federal clean air and water standards and socio-economic concerns. The report will be organized into two volumes. The main text comprises the basic topics of physical concerns, regulatory requirements, and permitting activities, while the second volume includes the detailed appendix materials such as the applicable laws, and the necessary permits, as available and a glossary of pertinent terms. As a means to this objective, three refinery sizes, 200,000, 100,000 and 30,000 barrels per day crude charge will be discussed in technical terms. Process unit configuration will be presented which will maximize either gasoline or heating oil production with either sweet or sour crude oil feedstocks. The major issues affecting the socio-economic impact of siting the refinery in a given locale will be presented. These data will review the factors affecting the human environment and the issues that must be addressed to assess the impact that a refinery will have on a community. The key federal registrations which impact upon a refinery siting decision shall be reviewed. Summaries of these regulations and a simplified decision diagram for the air and water acts shall be presented to assist both government and refinery officials in understanding the scope of regulatory impact. All pertinent procedures required for refinery permitting shall be reviewed under the generalized headings of air, water, health and safety, land use, and miscellaneous permits. This categorization at the federal, state and local levels of government shall be used as a basis for establishing degrees of emphasis.

  19. The refinery industry within the Mediterranean area

    International Nuclear Information System (INIS)

    1999-01-01

    During the period 1997-1998 Ome (Observatorie Mediterraneen de l'Energie) within a working group which was formed by the experts among the associated companies, has carried on an analysis on the prospects of refinery industry in the Mediterranean area in view of 2010. The aim of this study was to make clear, to the different operators, the consequences of the political choices in investments on refinery industry in the context of the progressive liberalization of the sector [it

  20. Improving profitability in a grassroots refinery

    Energy Technology Data Exchange (ETDEWEB)

    Coombs, T. [Star Petroleum Refining Co. Ltd. (Thailand); Kennedy, P.; Bhargava, S. [KBC Process Technology Ltd. (United Kingdom)

    1999-05-01

    Actions taken to maximise profit at the Star Refinery in Thailand are described. The company made good use of the Profit Improvement Programme (PIP) (which specialises in refinery economics) and the way in which PIP addressed the problem and the benefits derived therefrom is the nub of this paper. The efforts appear to have been more than satisfactory from the aspect of increasing profit margins. (UK)

  1. Current situation of oil refinery in Bulgaria

    Science.gov (United States)

    Vershkova, Elena; Petkova, Petinka; Grinkevich, Anastasia

    2016-09-01

    This article deals with the classification approach for oil refineries in international practices. Criteria of refinery estimation group, including its financial status estimation, have been investigated. The analysis object is “Lukoil Neftochim Bourgas” AD (LNCHB) activity. This company is a leading enterprise in Bulgaria. The analysis of LNCHB operating: energy intensity index; index of operating costs and return on investment index have been performed.

  2. Plus 10 million tons plan. Feasible increased Danish production of sustainable biomass for bio-refineries; + 10 mio. tons planen - muligheder for en oeget dansk produktion af baeredygtig biomasse til bioraffinaderier

    Energy Technology Data Exchange (ETDEWEB)

    Gylling, M.; Scott Bentsen, N.; Felby, C.; Kvist Johannsen, V. (Koebenhavns Univ., Frederiksberg (Denmark)); Joergensen, Uffe; Kristensen, Inge T.; Dalgaard, T. (Aarhus Univ., Aarhus (Denmark))

    2012-07-01

    The desire to create sustainable solutions in the energy sector has led researchers at the University of Copenhagen, Aarhus University and research and development staff from DONG Energy to enter into a cooperation agreement that will start concrete initiatives in research and education in green energy. An important part of the collaboration is a study of how we can produce more biomass compared to today without compromising food production, feed production or the environment. The present study shows that it can be done through a total commitment to sustainable technology and biology. The report also describes the effects of the establishment of a Danish supplied bio-refinery sector. In order to achieve this required additional research and development is required, particularly in agriculture and forestry but also in biological and chemical conversion of biomass. The initiative supports the BioRefining Alliance, which brings together Danish companies, public partners and organizations with world-class knowledge and technologies for bio-refinery. (LN)

  3. Complexity index indicates refinery capability, value

    International Nuclear Information System (INIS)

    Johnston, D.

    1996-01-01

    Refinery size usually is measured in terms of distillation capacity. Relative size, however, can be measured using refinery complexity--a concept developed by W.L. Nelson in the 1960s. Nelson developed the complexity index to quantify the relative cost of components that make up a refinery. It is a pure cost index that provides a relative measure of the construction costs of a particular refinery based on its crude and upgrading capacity. The Nelson index compares the costs of various upgrading units--such as a fluid catalytic cracking (FCC) unit or a catalytic reformer--to the cost of a crude distillation unit. Computation of the index is an attempt to quantify the relative cost of a refinery based on the added cost of various upgrading units and the relative upgrading capacity. A review of complexity calculations, and an explanation of how indices have changed, provide a simple means of determining the complexity of single refineries or refining regions. The impact of complexity on product slate is also examined in this paper

  4. The rise and fall of refineries

    International Nuclear Information System (INIS)

    Chretien, D.

    2002-01-01

    This paper described the rise and fall of refineries in Montreal. Well before Calgary, Montreal was the hub of activity for oil refineries because Montreal was the principle consuming market for petroleum products in Canada. The location was good, particularly since the soil was clay which helped prevent soil infiltration of petroleum. The first refinery in Montreal was constructed in 1916 by Esso, followed by Texaco in 1921 and Gulf in 1931. Initially oil was shipped by boat to the Port of Montreal from Saudi Arabia. Later, the petroleum came mostly from Venezuela. At the beginning of the 1980s many refineries were closed because they became obsolete and upgrading them would have been too costly. Only 3 refineries remain in Quebec, of which 2 are in Montreal. They are owned by Shell and PetroCanada. The third refinery in Quebec is in St-Romuald and is owned by UltraMar. One of the major contributing factors to the decline of the refining industry in Montreal was the decision in 1984 by former Prime Minister Trudeau to force Canadian provinces to purchase their petroleum from Alberta. This caused the petrochemical industry to locate in Sarnia in Ontario, leaving the Montreal refining centre to become obsolete. 3 figs

  5. Maintenance, outages and chemistry really can be compatible

    International Nuclear Information System (INIS)

    Roberts, J.G.; Deaconescu, R.

    2006-01-01

    'Full text:' In their address to the Canadian Nuclear Society, Bruce Power's Chemistry Design staff will describe how maintenance and outages can impact negatively on chemistry control and asset protection. Considerations of material impacts and material condition have significant influences on the approach to, and control of, chemistry. This applies equally to operation as it does during unit and/or system outages. Ideas will be presented as to how to facilitate making maintenance, outages and chemistry compatible. It will be shown how the lack of such an approach can lead to disastrous results. (author)

  6. Maintenance, outages and chemistry really can be compatible

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J.G.; Deaconescu, R. [Bruce Power, Tiverton, Ontario (Canada)

    2006-07-01

    'Full text:' In their address to the Canadian Nuclear Society, Bruce Power's Chemistry Design staff will describe how maintenance and outages can impact negatively on chemistry control and asset protection. Considerations of material impacts and material condition have significant influences on the approach to, and control of, chemistry. This applies equally to operation as it does during unit and/or system outages. Ideas will be presented as to how to facilitate making maintenance, outages and chemistry compatible. It will be shown how the lack of such an approach can lead to disastrous results. (author)

  7. Feasibility study on the modernization and expansion of the Tema Oil Refinery. Executive Summary. Export trade information

    International Nuclear Information System (INIS)

    Anon.

    1992-04-01

    The Tema Oil Refinery (TOR), which was commissioned in 1963, is a simple hydro-skimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years some of the equipment in the refinery has deteriorated or become obsolete necessitating major rehabilitation. A study of the refinery expansion project takes into consideration earlier studies and, equally important, recognizes the extensive work done by TOR in rehabilitating the refinery. The program, carried out in phases because of funding limitations, has addressed the critical repairs and replacements in the process units and utilities necessary to prolong the life of the refinery and assure reliability and safe operation. It undertook the task of investigating the feasibility of modernizing and expanding the refinery at Tema, Ghana to meet projected market demands until the year 2005. A process planning study was conducted to select the optimal process and utility configuration which would result in economic benefits to Ghana

  8. Outage Analysis of Asymmetric RF-FSO Systems

    KAUST Repository

    Ansari, Imran Shafique; Abdallah, Mohamed M.; Alouini, Mohamed-Slim; Qaraqe, Khalid A.

    2017-01-01

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channels cascaded with free-space optical (FSO) links is presented. The RF links are modeled by the Rayleigh fading

  9. Outage performance of cognitive radio systems with Improper Gaussian signaling

    KAUST Repository

    Amin, Osama

    2015-06-14

    Improper Gaussian signaling has proved its ability to improve the achievable rate of the systems that suffer from interference compared with proper Gaussian signaling. In this paper, we first study impact of improper Gaussian signaling on the performance of the cognitive radio system by analyzing the outage probability of both the primary user (PU) and the secondary user (SU). We derive exact expression of the SU outage probability and upper and lower bounds for the PU outage probability. Then, we design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the proposed bounds and adaptive algorithms by numerical results.

  10. Outage performance of cognitive radio systems with Improper Gaussian signaling

    KAUST Repository

    Amin, Osama; Abediseid, Walid; Alouini, Mohamed-Slim

    2015-01-01

    design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the proposed bounds and adaptive algorithms by numerical

  11. Catalytic hydrotreatment of refinery waste

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    The object of the project is to produce liquid hydrocarbons by the catalytic hydroprocessing of solid refinery wastes (hard pitches) in order to improve the profitability of deep conversion processes and reduce the excess production of heavy fuels. The project was mostly carried out on the ASVAHL demonstration platform site, at Solaize, and hard pitches were produced primarily by deasphalting of atmospheric or vacuum distillation residues. The project includes two experimental phases and an economic evaluation study phase. In phase 1, two granular catalysts were used to transform pitch into standard low sulphur fuel oil: a continuously moving bed, with demetallation and conversion catalyst; a fixed bed, with hydrorefining catalyst. In phase 2 of the project, it was proven that a hydrotreatment process using a finely dispersed catalyst in the feedstock, can, under realistic operating conditions, transform with goods yields hard pitch into distillates that can be refined through standard methods. In phase 3 of the project, it was shown that the economics of such processes are tightly linked to the price differential between white and black oil products, which is expected to increase in the future. Furthermore, the evolution of environmental constraints will impel the use of such methods, thus avoiding the coproduction of polluting solid residues.

  12. Bioremediation at a petroleum refinery

    International Nuclear Information System (INIS)

    Carson, A.W.; Jarvis, J.; Richardson, K.E.

    1994-01-01

    This paper presents a summary of three projects at the Mobil Refinery in Torrance, California where bioremediation technologies were successfully employed for the remediation of hydrocarbon contaminated soil. The three projects represent variations of implementation of bioremediation, both in-situ and ex-situ. Soil from all of the projects was considered non-hazardous designated waste under the California Code of Regulations, Title 23, section 2522. The projects were permitted and cleanup requirements were defined with the Los Angeles Regional Water Quality Control Board. In all of the projects, different methods were used for supplying water, oxygen, and nutrients to the hydrocarbon degrading bacteria to stimulate growth. The Stormwater Retention Basin Project utilized in-situ mechanical mixing of soils to supply solid nutrients and oxygen, and a self-propelled irrigation system to supply water. The Tank Farm Lake project used an in-situ active bioventing technology to introduce oxygen, moisture, and vapor phase nutrients. The Tank 1340X247 project was an ex-situ bioventing remediation project using a drip irrigation system to supply water and dissolved nutrients, and a vapor extraction system to provide oxygen

  13. Refinery boom in Southeast Asia

    International Nuclear Information System (INIS)

    Gruson, J.F.; Virondaud, C.

    1996-01-01

    The Asia demand for oil is increasing dramatically, particularly in the non OECD countries, which represent, today more than 15 % of the world oil market. The expected economic growth in these areas should contribute to a rise in oil demand by about 5.4 per year and hence to a significant increase of this share to 25 % in 2010; virtually a large part of this evolution will come from the transportation sector. The proceeding investments of the regional, refining industry are very high (some evaluations come to around 140 billion of dollars), all the more the protection of the environment takes an increasing significant place. Accordingly the most important challenge to be taken up by these countries will be to mobilize long term fundings to develop and adapt the capabilities of the refineries to meet the growth of gasoline and gas oil demand. The contribution of private operators or capital will be necessary, but will depend strongly on refining margin improvement and on progress of free market areas announced by several countries. (authors)

  14. Configuration control during plant outages. A review of operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Peinador Veira, Miguel; El Kanbi, Semir [European Commission Joint Research Centre, Petten (Netherlands). Inst. for Energy and Transport; Stephan, Jean-Luc [Institut de Radioprotection et de Surete Nucleaire (IRSN), Fontenay-aux-Roses (France); Martens, Johannes [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) gGmbH, Koeln (Germany)

    2015-03-15

    After the occurrence of several significant events in nuclear power plants during shut-down modes of operation in the eighties, and from the results of probabilistic safety assessments completed in the nineties, it was clear that risk from low power and shutdown operational modes could not be neglected and had to be addressed by appropriate safety programs. A comprehensive review of operating experience from the last ten years has been conducted by the Joint Research Centre with the objective of deriving lessons learned and recommendations useful for nuclear regulatory bodies and utilities alike. This paper is focused on one particular challenge that any nuclear plant faces whenever it plans its next outage period: how to manage the configuration of all systems under a complex environment involving numerous concurrent activities, and how to make sure that systems are returned to their valid configuration before the plant resumes power operation. This study highlights the importance of conveying accurate but synthesized information on the status of the plant to the operators in the main control room. Many of the lessons learned are related to the alarm display in the control room and to the use of check lists to control the status of systems. Members of the industry and safety authorities may now use these recommendations and lessons learned to feed their own operating experience feedback programs, and check their applicability for specific sites.

  15. OPG's approach of crediting natural circulation in outage heat sinks

    International Nuclear Information System (INIS)

    Fung, K.K.; Mackinnon, J.C.

    2001-01-01

    A review of crediting natural circulation as a backup means of removing the reactor core decay heat during an outage in Ontario Power Generation's nuclear stations was completed in 2000. The objective was to define the configurations and conditions under which natural circulation can be confidently credited as an effective heat transport mechanism for use in shutdown heat sink management. The project was an interdisciplinary program, and involved analyses in the areas of heat transport system thermalhydaulics, fuel and fuel channel thermal and mechanical behaviour, radiation physics, and probabilistic risks. The assessment shows that it is economically acceptable to credit natural circulation as a backup means of removing the core decay heat whenever the no fuel failure criteria are met. The economic risks associated with such a potential use decrease with time after shutdown. The waiting times after shutdown when there would be various levels of risks of damaging the pressure tubes and fuel bundles were derived for use in planning maintenance activities so as to minimize the economic risks. (author)

  16. The status of the Hanaro class 4 power outage

    International Nuclear Information System (INIS)

    Hyungkyoo, K.; Hoansung, J.; Jongsup, W.

    2004-01-01

    Electric power is essential for all industrial plant. All who use electric power desire a perfect frequency, voltage stability, and reliability all the time. But this cannot be realized in practice because of the many causes of a power supply disturbance that are beyond the control of the utility. Since the first criticality of the Hanaro research reactor, the major reasons for reactor trips were system malfunctions and inexperienced operators in the initial stage of its operation. As Hanaro is stabilizing, the power supply outage becomes the major reason for a reactor trip. This paper describes the status of power supply outages. This paper deals with not only the outages which have an effect on Hanaro operation but also the reasons for the Hanaro class-4 power outages. The class-4 power is a commercial power which supplies the load centers and the large motors such as primary cooling pumps and secondary cooling pumps. Even if a class-4 power outage occurs, Hanaro is safe because of the reactor cooling by natural convection and the flywheel effect of the primary cooling pumps. The analysis of the characteristics and the trends of the outages can provide clues to how the outages can be minimized and what the impact of the outages are on the operation. For the site-wide class-4 power, the latest failure rate has been 2.36 per year and the mean time to repair is 23,78 minutes for the exponentially weighted mowing average. The unavailability of the Class-4 power is 1.5 10 -4

  17. Predicting Power Outages Using Multi-Model Ensemble Forecasts

    Science.gov (United States)

    Cerrai, D.; Anagnostou, E. N.; Yang, J.; Astitha, M.

    2017-12-01

    Power outages affect every year millions of people in the United States, affecting the economy and conditioning the everyday life. An Outage Prediction Model (OPM) has been developed at the University of Connecticut for helping utilities to quickly restore outages and to limit their adverse consequences on the population. The OPM, operational since 2015, combines several non-parametric machine learning (ML) models that use historical weather storm simulations and high-resolution weather forecasts, satellite remote sensing data, and infrastructure and land cover data to predict the number and spatial distribution of power outages. A new methodology, developed for improving the outage model performances by combining weather- and soil-related variables using three different weather models (WRF 3.7, WRF 3.8 and RAMS/ICLAMS), will be presented in this study. First, we will present a performance evaluation of each model variable, by comparing historical weather analyses with station data or reanalysis over the entire storm data set. Hence, each variable of the new outage model version is extracted from the best performing weather model for that variable, and sensitivity tests are performed for investigating the most efficient variable combination for outage prediction purposes. Despite that the final variables combination is extracted from different weather models, this ensemble based on multi-weather forcing and multi-statistical model power outage prediction outperforms the currently operational OPM version that is based on a single weather forcing variable (WRF 3.7), because each model component is the closest to the actual atmospheric state.

  18. Evolution of an outage management organization in a small utility

    International Nuclear Information System (INIS)

    Oubre, R.P.; Shetler, J.

    1985-01-01

    Six refueling outages with a number of major equipment failure outages have taught Rancho Seco management three main items. One is that a dedicated management organization must be formed for the purpose of controlling work functions at Rancho Seco. This dedicated organization must have the experience of the plant and not have the responsibility for the actual maintenance. Second, upper management within a power plant must get directly involved in the outage. Upper management must show their presence, give input, and be available when needed. The third item learned is that the scheduling organization must be adequately staffed. Although Rancho Seco completed a refueling outage in 1978 within only 36 days, additional inspection requirements due to regulatory changes and/or previous equipment failures requiring follow-up actions would place the shortest possible outage today at approx.70 days. The only way an organization can keep this outage time down is with the proper scheduling of the resources and the timely coordination of activities to reduce conflicts

  19. Reducing refinery CO2 emissions through amine solvent upgrade and optimization

    Energy Technology Data Exchange (ETDEWEB)

    Alonso, Thiago V.; Valenzuela, Michelle [The Dow Chemical Company, Midland, MI (United States)

    2012-07-01

    Regional initiatives are underway to reduce and limit the emissions of greenhouse gases. With CO2 emissions making up over 80% of the greenhouse gases, cap-and-trade programs will focus on those industries that consume the most energy. Refineries are among the top energy consumers and are seeking opportunities to reduce usage. With tightening margins, energy management programs will not only help refineries meet CO{sub 2} emission regulations, but can also provide a competitive advantage. With the trend towards heavier and higher sulfur containing crudes, refineries are increasing processing capabilities, which can include capital-intensive projects and additional energy consumption. Energy conservation plans should include optimization of these processes. One area to consider includes the acid gas removal systems in refineries. Through the selection and use of optimal solvents and implementation of energy efficiency techniques, which require minimal capital investment and expenditures, refineries can reduce energy usage, overall CO{sub 2} emissions, and total cost in acid gas systems. This paper will discuss these approaches and share case studies detailing the implementation and results. (author)

  20. Development of an Overview Display to Allow Advanced Outage Control Center Management to Quickly Evaluate Outage Status

    Energy Technology Data Exchange (ETDEWEB)

    St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Hugo, Jacques Victor [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-09-01

    This report describes recent advances made in developing a framework for the design of visual outage information presentation, as well as an overview of the scientific principles that informed the development of the visualizations.

  1. Sample Results from MCU Solids Outage

    Energy Technology Data Exchange (ETDEWEB)

    Peters, T.; Washington, A.; Oji, L.; Coleman, C.; Poirier, M.

    2014-09-22

    Savannah River National Laboratory (SRNL) has received several solid and liquid samples from MCU in an effort to understand and recover from the system outage starting on April 6, 2014. SRNL concludes that the presence of solids in the Salt Solution Feed Tank (SSFT) is the likely root cause for the outage, based upon the following discoveries: A solids sample from the extraction contactor #1 proved to be mostly sodium oxalate; A solids sample from the scrub contactor#1 proved to be mostly sodium oxalate; A solids sample from the Salt Solution Feed Tank (SSFT) proved to be mostly sodium oxalate; An archived sample from Tank 49H taken last year was shown to contain a fine precipitate of sodium oxalate; A solids sample from ; A liquid sample from the SSFT was shown to have elevated levels of oxalate anion compared to the expected concentration in the feed. Visual inspection of the SSFT indicated the presence of precipitated or transferred solids, which were likely also in the Salt Solution Receipt Tank (SSRT). The presence of the solids coupled with agitation performed to maintain feed temperature resulted in oxalate solids migration through the MCU system and caused hydraulic issues that resulted in unplanned phase carryover from the extraction into the scrub, and ultimately the strip contactors. Not only did this carryover result in the Strip Effluent (SE) being pushed out of waste acceptance specification, but it resulted in the deposition of solids into several of the contactors. At the same time, extensive deposits of aluminosilicates were found in the drain tube in the extraction contactor #1. However it is not known at this time how the aluminosilicate solids are related to the oxalate solids. The solids were successfully cleaned out of the MCU system. However, future consideration must be given to the exclusion of oxalate solids into the MCU system. There were 53 recommendations for improving operations recently identified. Some additional considerations or

  2. Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages, Phase 1. Final report

    International Nuclear Information System (INIS)

    Thompson, C.A.

    1978-08-01

    The objective of this project is to identify improvements in procedures and equipment which will reduce the time required for refueling/maintenance outages at PWR nuclear power plants. The outage of Commonwealth Edison Zion Station Unit 1 in March through May of 1976 was evaluated to identify those items which caused delays and those work activities that offer the potential for significant improvements toward reducing its overall duration. Thus, the plant's availability for power production would be increased. Revisions in procedures and some equipment modifications were implemented and evaluated during the Zion Unit 2 refueling/maintenance outage beginning in January 1977. Analysis of the observed data has identified benefits available through improved refueling equipment and also areas where additional new, innovative refueling, or refueling-related equipment should be beneficial. A number of specific design concepts are recommended as a result of Phase 1. In addition, a new master planning mechanism is described for implementation during subsequent planned outages at Zion Station. This final report describes the recommended conceptual designs and planning mechanism and assesses their impact upon future outages. Their effect on savings in refueling time, labor, and radiation exposure is discussed. The estimated economic payoff for these concepts was found to be of such significance that an additional phase of the program is warranted. During this extended phase, a more detailed engineering study should be undertaken to determine the cost of implementation along with more specific estimates of the benefits for PWR plants already in operation or under construction

  3. Benzene exposure in a Japanese petroleum refinery.

    Science.gov (United States)

    Kawai, T; Yamaoka, K; Uchida, Y; Ikeda, M

    1990-07-01

    Time-weighted average (TWA) intensity of exposure of workers to benzene vapor during a shift was monitored by diffusive sampling technique in a Japanese petroleum refinery. The subjects monitored (83 in total) included refinery operators, laboratory personnel and tanker-loading workers. The results showed that the time-weighted average exposures are well below 1 ppm in most cases. The highest exposure was recorded in 1 case involved in bulk loading of tanker ships, in which exposure of over 1 ppm might take place depending on operational conditions. The observation was generally in agreement with levels previously reported.

  4. Line outage contingency analysis including the system islanding scenario

    Energy Technology Data Exchange (ETDEWEB)

    Hazarika, D.; Bhuyan, S. [Assam Engineering College, Jalukbari, Guwahati 781013 (India); Chowdhury, S.P. [Jadavpur University, Jadavpur, Kolkata 700 032 (India)

    2006-05-15

    The paper describes an algorithm for determining the line outage contingency of a line taking into account of line over load effect in remaining lines and subsequent tripping of over loaded line(s) leading to possible system split or islanding of a power system. The optimally ordered sparse [B'], [B'] matrices for the integrated system are used for load flow analysis to determine modified values of voltage phase angles [{delta}] and bus voltages [V] to determine the over loading effect on the remaining lines due to outage of a selected line outage contingency. In case of over loading in remaining line(s), the over loaded lines are removed from the system and a topology processor is used to find the islands. A fast decoupled load flow (FDLF) analysis is carried out for finding out the system variables for the islanded (or single island) system by incorporating appropriate modification in the [B'] and [B'] matrices of the integrated system. Line outage indices based on line overload, loss of load, loss of generation and static voltage stability are computed to indicate severity of a line outage of a selected line. (author)

  5. Integrated pollution control for oil refinery complexes

    Energy Technology Data Exchange (ETDEWEB)

    Kiperstok, A. [Bahia Univ., Salvador, BA (Brazil); Sharratt, P.N. [Manchester Univ. (United Kingdom). Inst. of Science and Technology

    1993-12-31

    Improving environmental performance of oil refineries is a complex task. Emission limits, operating constraints, available technologies, operating techniques, and local environment sensitivity must all be considered. This work describes efforts to build an interactive software to deal with this problem. 8 refs., 5 figs.

  6. Integrated pollution control for oil refinery complexes

    Energy Technology Data Exchange (ETDEWEB)

    Kiperstok, A [Bahia Univ., Salvador, BA (Brazil); Sharratt, P N [Manchester Univ. (United Kingdom). Inst. of Science and Technology

    1994-12-31

    Improving environmental performance of oil refineries is a complex task. Emission limits, operating constraints, available technologies, operating techniques, and local environment sensitivity must all be considered. This work describes efforts to build an interactive software to deal with this problem. 8 refs., 5 figs.

  7. Refinery siting workbook: appendices C to O

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Applicable laws and permits available for the selection and building of petroleum refineries are enclosed. A glossary of pertinent terms is also included. References related to the National Environmental Policy Act, the Clean Air Act, the Federal Water Pollution Control Act, Resource Conservation and Recovery Act, Toxic Substance Control Act, and Wetlands and Coastal Zone are included. Permit information is also presented. (DC)

  8. Outage Risk Assessment and Management (ORAM) thermal-hydraulics toolkit

    International Nuclear Information System (INIS)

    Denny, V.E.; Wassel, A.T.; Issacci, F.; Pal Kalra, S.

    2004-01-01

    A PC-based thermal-hydraulic toolkit for use in support of outage optimization, management and risk assessment has been developed. This mechanistic toolkit incorporates simple models of key thermal-hydraulic processes which occur during an outage, such as recovery from or mitigation of outage upsets; this includes heat-up of water pools following loss of shutdown cooling, inadvertent drain down of the RCS, boiloff of coolant inventory, heatup of the uncovered core, and reflux cooling. This paper provides a list of key toolkit elements, briefly describes the technical basis and presents illustrative results for RCS transient behavior during reflux cooling, peak clad temperatures for an uncovered core and RCS response to loss of shutdown cooling. (author)

  9. Wolsong Unit 1 restart chemistry procedures during retubing outage

    International Nuclear Information System (INIS)

    Yun, Hyunran; Lee, Sarang; Moon, Yunyong; Kim, Seoyul

    2015-01-01

    Lay-up is aimed at protecting systems from degradation during outage, mainly by minimizing corrosion and particularly, when the outage is longer than 16 weeks. Due to the intrinsic design of CANDU reactors, their horizontal fuel channels should be replaced for another service life time. This poster presents the lay-up guidelines and methods recommended for re-tubing outage based on the first re-tubing operation made in Korea (at the Wolsung Unit 1). It is shown that dry lay-up with specific gas blanket was the sole choice for the primary heat transfer system, the moderator system and the steam cycle system while wet lay-up under circulation was recommended for the end shield cooling system and the liquid zone control system. The water filled part of steam generators, of the liquid zone control system and of the end shield cooling system was maintained normal

  10. Refinery Upgrading of Hydropyrolysis Oil From Biomass

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, Michael [Gas Technology Inst., Des Plaines, IL (United States); Marker, Terry [Gas Technology Inst., Des Plaines, IL (United States); Ortiz-Toral, Pedro [Gas Technology Inst., Des Plaines, IL (United States); Linck, Martin [Gas Technology Inst., Des Plaines, IL (United States); Felix, Larry [Gas Technology Inst., Des Plaines, IL (United States); Wangerow, Jim [Gas Technology Inst., Des Plaines, IL (United States); Swanson, Dan [Gas Technology Inst., Des Plaines, IL (United States); McLeod, Celeste [CRI Catalyst, Houston, TX (United States); Del Paggio, Alan [CRI Catalyst, Houston, TX (United States); Urade, Vikrant [CRI Catalyst, Houston, TX (United States); Rao, Madhusudhan [CRI Catalyst, Houston, TX (United States); Narasimhan, Laxmi [CRI Catalyst, Houston, TX (United States); Gephart, John [Johnson Timber, Hayward, WI (United States); Starr, Jack [Cargill, Wayzata, MN (United States); Hahn, John [Cargill, Wayzata, MN (United States); Stover, Daniel [Cargill, Wayzata, MN (United States); Parrish, Martin [Valero, San Antonio, TX (United States); Maxey, Carl [Valero, San Antonio, TX (United States); Shonnard, David [MTU, Friedrichshafen (Germany); Handler, Robert [MTU, Friedrichshafen (Germany); Fan, Jiquig [MTU, Friedrichshafen (Germany)

    2015-08-31

    Cellulosic and woody biomass can be converted to bio-oils containing less than 10% oxygen by a hydropyrolysis process. Hydropyrolysis is the first step in Gas Technology Institute’s (GTI) integrated Hydropyrolysis and Hydroconversion IH2®. These intermediate bio-oils can then be converted to drop-in hydrocarbon fuels using existing refinery hydrotreating equipment to make hydrocarbon blending components, which are fully compatible with existing fuels. Alternatively, cellulosic or woody biomass can directly be converted into drop-in hydrocarbon fuels containing less than 0.4% oxygen using the IH2 process located adjacent to a refinery or ethanol production facility. Many US oil refineries are actually located near biomass resources and are a logical location for a biomass to transportation fuel conversion process. The goal of this project was to work directly with an oil refinery partner, to determine the most attractive route and location for conversion of biorenewables to drop in fuels in their refinery and ethanol production network. Valero Energy Company, through its subsidiaries, has 12 US oil refineries and 11 ethanol production facilities, making them an ideal partner for this analysis. Valero is also part of a 50- 50 joint venture with Darling Ingredients called Diamond Green Diesel. Diamond Green Diesel’s production capacity is approximately 11,000 barrels per day of renewable diesel. The plant is located adjacent to Valero’s St Charles, Louisiana Refinery and converts recycled animal fats, used cooking oil, and waste corn oil into renewable diesel. This is the largest renewable diesel plant in the U.S. and has successfully operated for over 2 years For this project, 25 liters of hydropyrolysis oil from wood and 25 liters of hydropyrolysis oils from corn stover were produced. The hydropyrolysis oil produced had 4-10% oxygen. Metallurgical testing of hydropyrolysis liquids was completed by Oak Ridge National Laboratories (Oak Ridge) and showed the

  11. The life and times of a western refinery

    International Nuclear Information System (INIS)

    Thomas, W.

    1998-01-01

    An historical account is given of the discovery of oil by Imperial Oil Ltd., at Leduc in 1947, and the opening of a refinery in Edmonton in 1948. The discovery at Leduc was the first major strike to be made in western Canada, but Imperial Oil did not have a refinery at the site to process the new found crude. Given the economic constraints of the postwar era, Imperial Oil decided to dismantle and move an idle and virtually brand-new refinery located at Whitehorse, Yukon. It took 10 months to reassemble the refinery at its newly prepared site at Edmonton. Regular expansions and improvements helped to ensure that the refinery kept up with the advances in technology and market demand. By the early 1970s, small refineries were becoming uneconomical as distribution of products by pipelines became possible. In 1976 Imperial Oil spent more than $300 million to consolidate its four Prairie refineries, those in Calgary, Winnipeg, Regina and Edmonton, into one large facility at the Edmonton site. The role that the refinery plays in today's community and the effort that Imperial Oil makes to comply with stringent environmental regulations were described. Today, the refinery is producing 165,000 barrels a day of fuels and lubricants and another 20,000 barrels of asphalt. The refinery supplies more than 200 different products to customers across Canada, with unit costs which are amongst the lowest of North American refineries. figs

  12. Assessing energy supply security: Outage costs in private households

    International Nuclear Information System (INIS)

    Praktiknjo, Aaron J.; Hähnel, Alexander; Erdmann, Georg

    2011-01-01

    The objective of this paper is to contribute to the topic of energy supply security by proposing a Monte Carlo-based and a survey based model to analyze the costs of power interruptions. Outage cost estimations are particularly important when deciding on investments to improve supply security (e.g. additional transmission lines) in order to compare costs to benefits. But also other policy decisions on measures that have direct or indirect consequences for the supply security (e.g. a phasing out of nuclear energy) need to be based on results from outage cost estimations. The main focus of this paper lies with residential consumers, but the model is applied to commercial, industrial and governmental consumers as well. There are limited studies that have approached the problem of evaluating outage cost. When comparing the results of these studies, they often display a high degree of diversification. As consumers have different needs and dependencies towards the supply of electricity because of varying circumstances and preferences, a great diversity in outage cost is a logical consequence. To take the high degree of uncertainties into account, a Monte Carlo simulation was conducted in this study for the case of private households in Germany. - Highlights: ► A macroeconomic model to assess outage cost is proposed. ► Possibilities for substitution are considered by analyzing individual preferences for the time-use. ► Uncertainties are taken into account by using a Monte Carlo simulation. ► This study reveals the distribution of outage costs to different electricity consumers. ► Implications for energy policy decisions are discussed.

  13. The course of a true outage never ran so smooth

    International Nuclear Information System (INIS)

    Harberts, Craig

    1994-01-01

    In order to improve the performance of outages at San Onofre Nuclear Generating Station in California, the working structure of the entire organisation has had to be radically altered, in order to bring San Onofre up to standard with other nuclear plants known to be performing well. Working systems were simplified and efficiency improved. Personnel needed to be remotivated to work cooperatively and the outage budget process was revised to include input from all relevant organizations, historical costs and benchmark information from other plants that performed well. Finally, the decision making and teamwork culture has altered radically at San Onofre over the last decade. (UK)

  14. Impacts of organization and management on outage performance

    International Nuclear Information System (INIS)

    Huang Yuhao; Cheng, S.-K.

    2004-01-01

    From probabilistic safety assessments and root cause analyses for incidents/accidents, the risk at refueling outage has recently been recognized to be comparable to (or even more significant than) the commonly evaluated risk at power in a Nuclear Power Plant (NPP). This paper summarizes the major findings in the aspect of 'organization and management', which is identified to have significant impacts on outage performance in the qualitative assessment of a PWR plant. In order to reduce the potential risk arisen from those identified imperfections, the corresponding suggestions are also proposed. (author)

  15. On test and maintenance: Optimization of allowed outage time

    International Nuclear Information System (INIS)

    Mavko, B.; Cepin, M.T.

    2000-01-01

    Probabilistic Safety Assessment is widely becoming standard method for assessing, maintaining, assuring and improving the nuclear power plant safety. To achieve one of its many potential benefits, the optimization of allowed outage time specified in technical specifications is investigated. Proposed is the risk comparison approach for evaluation of allowed outage time. The risk of shutting the plant down due to failure of certain equipment is compared to the risk of continued plant operation with the specified equipment down. The core damage frequency serves as a risk measure. (author)

  16. Efficient Simulation of the Outage Probability of Multihop Systems

    KAUST Repository

    Ben Issaid, Chaouki; Alouini, Mohamed-Slim; Tempone, Raul

    2017-01-01

    In this paper, we present an efficient importance sampling estimator for the evaluation of the outage probability of multihop systems with amplify-and-forward channel state-information-assisted. The proposed estimator is endowed with the bounded relative error property. Simulation results show a significant reduction in terms of number of simulation runs compared to naive Monte Carlo.

  17. Refueling outage services in Spanish Nuclear Power Plants

    International Nuclear Information System (INIS)

    Landete, J. L.; Soto, M.; Nunuez, A.

    2007-01-01

    DOMINGUIS Group, through its 75 years of business development, has positioned as the Spanish leader Group in Services for the Nuclear Energy and Petrochemical Sectors. In this article, we present the most significant services summary that, through the companies that constitute DOMINGUIS Group, we have developed in Refueling Outage in Spanish Nuclear Power Plants. (Author)

  18. Efficient Simulation of the Outage Probability of Multihop Systems

    KAUST Repository

    Ben Issaid, Chaouki

    2017-10-23

    In this paper, we present an efficient importance sampling estimator for the evaluation of the outage probability of multihop systems with amplify-and-forward channel state-information-assisted. The proposed estimator is endowed with the bounded relative error property. Simulation results show a significant reduction in terms of number of simulation runs compared to naive Monte Carlo.

  19. Operation : motor city : Michigan's only refinery to handle an increased slate of heavy Canadian crude

    International Nuclear Information System (INIS)

    Jaremko, D.

    2008-01-01

    A planned $1.9 billion upgrade and expansion will see a Detroit, Michigan refinery producing nearly 100 per cent Canadian crude oil. The upgrade will have important social, economic, and environmental implications for the oil sands industry, and is being seen as an important step for the future of the entire energy industry. The site was selected after a consultation of pipeline routes in North America. The refinery's coking capacity will help to ease the market constraints that Canadian crude is currently facing in the United States. The Midwest downstream oil and gas industry is well-positioned to help maximize the value of Canada's bitumen resources. In addition to expanding processing facilities, the refinery will also add capacity of approximately 15,000 barrels per day, as well as a delayed coker, sulphur recovery complex, ultra-low nitrogen oxide (NO x ) burners, a 33,000 barrel-per-day distillate hydrotreater, and a hydrogen plant. It was concluded that construction of the refinery will be completed by 2010. 2 figs

  20. Profitability diagnosis of refinery and improvement proposal; Seiyusho no shueki shindan to kaizen teian

    Energy Technology Data Exchange (ETDEWEB)

    Aoyama, H.

    2000-07-01

    Based on consulting service RPS-J under joint operation of Nikki, UOP LLC of U.S.A. and Nikki Universal, approaching ways applied for profitability improvement and improvement proposal for refineries and analyzing techniques used for resolution of process bottlenecks were described. In RPS-J, themes of (1) energy saving, (2) quality upgrading, (3) improvement of disintegrating ratio, (4) reduction of give-away, (5) improvement of equipment operation ratio, (6) reduction of maintenance cost, (7) effective utilization of catalysts, are considered for profitability improvement fields. Procedures from idea excavation for profitability improvement to realization of profitability improvement are carried out in the order of, (1) Grasping of the present state, (2) Excavation of improving items and selection, (3) Quantitative evaluation of draft profitability improvement plan and focusing, (4) Profitability improvement by operation improvement, (5) Profitability improvement by minor improvement, (6) Profitability improvement in middle- and long-term vision, (7) Final focusing by feasibility study. Afterwards, examination to economically solve bottlenecks of critical facilities, examination on bottlenecks of distillation tower and refining tower and utility analysis are carried out. RPS-J was already applied to 4 refineries including Muroran Refinery and Negishi Refinery of Nisseki Mitsubishi, and profitability improvement themes were found to improve profitability of 50 to 150 cents per barrel. (NEDO)

  1. 40 CFR 80.94 - Requirements for gasoline produced at foreign refineries.

    Science.gov (United States)

    2010-07-01

    ... inspection or audit if a baseline petition has not been approved, and any work papers related to refinery... foreign refineries. 80.94 Section 80.94 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... for gasoline produced at foreign refineries. (a) Definitions. (1) A foreign refinery is a refinery...

  2. Does Your Domestic Photovoltaic Energy System Survive Grid Outages?

    Directory of Open Access Journals (Sweden)

    Marijn R. Jongerden

    2016-09-01

    Full Text Available Domestic renewable energy systems, including photovoltaic energy generation, as well as local storage, are becoming increasingly popular and economically feasible, but do come with a wide range of options. Hence, it can be difficult to match their specification to specific customer’s needs. Next to the usage-specific demand profiles and location-specific production profiles, local energy storage through the use of batteries is becoming increasingly important, since it allows one to balance variations in production and demand, either locally or via the grid. Moreover, local storage can also help to ensure a continuous energy supply in the presence of grid outages, at least for a while. Hybrid Petri net (HPN models allow one to analyze the effect of different battery management strategies on the continuity of such energy systems in the case of grid outages. The current paper focuses on one of these strategies, the so-called smart strategy, that reserves a certain percentage of the battery capacity to be only used in case of grid outages. Additionally, we introduce a new strategy that makes better use of the reserved backup capacity, by reducing the demand in the presence of a grid outage through a prioritization mechanism. This new strategy, called power-save, only allows the essential (high-priority demand to draw from the battery during power outages. We show that this new strategy outperforms previously-proposed strategies through a careful analysis of a number of scenarios and for a selection of survivability measures, such as minimum survivability per day, number of survivable hours per day, minimum survivability per year and various survivability quantiles.

  3. The acid refinery wastes in environment

    International Nuclear Information System (INIS)

    Samesova, D.; Ladomersky, J.; Hroncova, E.

    2003-01-01

    The aim of our paper is to assign ways and means of the pollution extension from the old landfills of the petrochemical sludges. In the past the sludges were deposited in sludge landfills. Nowadays remediation of the landfills is a key problem. We analyse condition of the refinery sludges latching. We found out the meaning influences of leachate time, temperature, concentration and liquid kind. (authors)

  4. Opportunities for Biorenewables in Oil Refineries

    Energy Technology Data Exchange (ETDEWEB)

    Marker, T.L.

    2005-12-19

    Abstract: The purpose of this study was to evaluate the potential for using biorenewable feedstocks in oil refineries. Economic analyses were conducted, with support from process modeling and proof of principle experiments, to assess a variety of potential processes and configurations. The study considered two primary alternatives: the production of biodiesel and green diesel from vegetable oils and greases and opportunities for utilization of pyrolysis oil. The study identified a number of promising opportunities for biorenewables in existing or new refining operations.

  5. Metal leaching from refinery waste hydroprocessing catalyst.

    Science.gov (United States)

    Marafi, Meena; Rana, Mohan S

    2018-05-18

    The present study aims to develop an eco-friendly methodology for the recovery of nickel (Ni), molybdenum (Mo), and vanadium (V) from the refinery waste spent hydroprocessing catalyst. The proposed process has two stages: the first stage is to separate alumina, while the second stage involves the separation of metal compounds. The effectiveness of leaching agents, such as NH 4 OH, (NH 4 ) 2 CO 3 , and (NH 4 ) 2 S 2 O 8 , for the extraction of Mo, V, Ni, and Al from the refinery spent catalyst has been reported as a function of reagent concentration (0.5 to 2.0 molar), leaching time (1 to 6 h), and temperature (35 to 60°C). The optimal leaching conditions were achieved to obtain the maximum recovery of Mo, Ni, and V metals. The effect of the mixture of multi-ammonium salts on the metal extraction was also studied, which showed an adverse effect for Ni and V, while marginal improvement was observed for Mo leaching. The ammonium salts can form soluble metal complexes, in which stability or solubility depends on the nature of ammonium salt and the reaction conditions. The extracted metals and support can be reused to synthesize a fresh hydroprocessing catalyst. The process will reduce the refinery waste and recover the expensive metals. Therefore, the process is not only important from an environmental point of view but also vital from an economic perspective.

  6. Ranking environmental liabilities at a petroleum refinery

    International Nuclear Information System (INIS)

    Lupo, M.

    1995-01-01

    A new computer model is available to allow the management of a petroleum refinery to prioritize environmental action and construct a holistic approach to remediation. A large refinery may have numerous solid waste management units regulated by the Resource Conservation and Recovery Act (RCRA), as well as process units that emit hazardous chemicals into the environment. These sources can impact several environmental media, potentially including the air, the soil, the groundwater, the unsaturated zone water, and surface water. The number of chemicals of concern may be large. The new model is able to rank the sources by considering the impact of each chemical in each medium from each source in terms of concentration, release rate, and a weighted index based on toxicity. In addition to environmental impact, the sources can be ranked in three other ways: (1) by cost to remediate, (2) by environmental risk reduction caused by the remediation in terms of the decreases in release rate, concentration, and weighted index, and (3) by cost-benefit, which is the environmental risk reduction for each source divided by the cost of the remedy. Ranking each unit in the refinery allows management to use its limited environmental resources in a pro-active strategic manner that produces long-term results, rather than in reactive, narrowly focused, costly, regulatory-driven campaigns that produce only short-term results

  7. A framework and review of customer outage costs: Integration and analysis of electric utility outage cost surveys

    Energy Technology Data Exchange (ETDEWEB)

    Lawton, Leora; Sullivan, Michael; Van Liere, Kent; Katz, Aaron; Eto, Joseph

    2003-11-01

    A clear understanding of the monetary value that customers place on reliability and the factors that give rise to higher and lower values is an essential tool in determining investment in the grid. The recent National Transmission Grid Study recognizes the need for this information as one of growing importance for both public and private decision makers. In response, the U.S. Department of Energy has undertaken this study, as a first step toward addressing the current absence of consistent data needed to support better estimates of the economic value of electricity reliability. Twenty-four studies, conducted by eight electric utilities between 1989 and 2002 representing residential and commercial/industrial (small, medium and large) customer groups, were chosen for analysis. The studies cover virtually all of the Southeast, most of the western United States, including California, rural Washington and Oregon, and the Midwest south and east of Chicago. All variables were standardized to a consistent metric and dollar amounts were adjusted to the 2002 CPI. The data were then incorporated into a meta-database in which each outage scenario (e.g., the lost of electric service for one hour on a weekday summer afternoon) is treated as an independent case or record both to permit comparisons between outage characteristics and to increase the statistical power of analysis results. Unadjusted average outage costs and Tobit models that estimate customer damage functions are presented. The customer damage functions express customer outage costs for a given outage scenario and customer class as a function of location, time of day, consumption, and business type. One can use the damage functions to calculate outage costs for specific customer types. For example, using the customer damage functions, the cost experienced by an ''average'' customer resulting from a 1 hour summer afternoon outage is estimated to be approximately $3 for a residential customer, $1

  8. Amoco/Environmental Protection Agency Pollution Prevention Project, Yorktown refinery. Refinery release inventory. Final report

    International Nuclear Information System (INIS)

    Klee, H.; Kizier, G.J.; Baloo, S.; Hockman, E.L.; Couzens-Roberts, C.

    1992-07-01

    The report volume summarizes physical data obtained during a 2-year pollution prevention study of Amoco Oil Company's Yorktown Virginia Refinery. The study was jointly sponsored as a cooperative effort of Amoco Corporation and the United States Environmental Protection Agency. A multi-media sampling program was used to identify potential pollution sources within the Refinery. Sampling and analysis included air, surface water, groundwater, and solid waste data. Public perceptions about environmental issues of concern in the vicinity of the Refinery were also surveyed. The inventory showed that nearly 99 percent of the releases were airborne at the facility. Most of the remainder involved land disposal of solid wastes. Specific sources of major pollutants are identified

  9. Optimal utilization of outages. The tasks of the OEM and/or service provider

    International Nuclear Information System (INIS)

    Jakobs, Norbert; Grauf, Eberhard

    1998-01-01

    The deregulation of Europe's power market on January 1, 1999 will force many electric utilities and especially nuclear power plant operators to introduce extensive cost-cutting measures in order that they can hold their own in the new competitive environment. Existing plants basically have three potential ways of reducing their power generating costs: by increasing availability, reducing fuel costs and cutting back operating costs. Optimizing plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing expenditure on maintenance. In order to optimize an outage in terms of performance time and cost, there are a number of starting points based on certain key factors: organization, planning, logistics, performance monitoring, plant and equipment enhancements as well as personnel motivation. To reach this goal it is necessary for the original equipment manufacturer (OEM) and/or service provider to be involved in these activities to a much greater extent than before and for a closer form of partnership to be established with the consumer. For it is only within a team having a common set of goals that the successes of the past have been able to be achieved and new tasks can be efficiently handled in the future. (author)

  10. Spatial generalized linear mixed models of electric power outages due to hurricanes and ice storms

    International Nuclear Information System (INIS)

    Liu Haibin; Davidson, Rachel A.; Apanasovich, Tatiyana V.

    2008-01-01

    This paper presents new statistical models that predict the number of hurricane- and ice storm-related electric power outages likely to occur in each 3 kmx3 km grid cell in a region. The models are based on a large database of recent outages experienced by three major East Coast power companies in six hurricanes and eight ice storms. A spatial generalized linear mixed modeling (GLMM) approach was used in which spatial correlation is incorporated through random effects. Models were fitted using a composite likelihood approach and the covariance matrix was estimated empirically. A simulation study was conducted to test the model estimation procedure, and model training, validation, and testing were done to select the best models and assess their predictive power. The final hurricane model includes number of protective devices, maximum gust wind speed, hurricane indicator, and company indicator covariates. The final ice storm model includes number of protective devices, ice thickness, and ice storm indicator covariates. The models should be useful for power companies as they plan for future storms. The statistical modeling approach offers a new way to assess the reliability of electric power and other infrastructure systems in extreme events

  11. Operational Readiness Verification, Phase 3. A Field Study at a Swedish NPP during a Productive Outage (Safety-train Outage)

    International Nuclear Information System (INIS)

    Hollnagel, Erik; Gauthereau, Vincent; Persson, Bodil

    2004-01-01

    This report describes the results from Phase III of a study on Operational Readiness Verification (ORV) that was carried out from December 2002 to November 2003. The work comprised a field study of ORV activities at a Swedish NPP during a planned productive outage [subavstaellning], which allowed empirical work to be conducted in an appropriate environment with good accessibility to technical staff. One conclusion from Phase I of this project was the need to look more closely at the differences between three levels or types of tests that occur in ORV: object (component) test, system level test and (safety) function test, and to analyse the different steps of testing in order to understand the nontrivial relations between tests and safety. A second conclusion was the need to take a closer look at the organisation's ability to improvise in the sense of adjusting pre-defined plans to the actual conditions under which they are to be carried out. Phase II of the project found that although all three types of test occurred, they were rather used according to need rather than to a predefined arrangement or procedure. The complexity of ORV could be understood and described by using the concepts of Community of Practice, embedding, and Efficiency-Thoroughness Trade-Off. In addition, organisation and the different communities of practice improvise by adjusting pre-defined plans or work orders to the existing conditions. Such improvisations take place both on the levels of individual actions, on the level of communities of practice, and on the organisational level. The ability to improvise is practically a necessity for work to be carried out, but is also a potential risk. Phase III of the project studied how tasks are adapted relative to the different types of embedding and the degree of correspondence between nominal and actual ORV. It also looked further at the different Communities of Practice that are part of maintenance and ORV, focusing on the coordination and

  12. Operational Readiness Verification, Phase 3. A Field Study at a Swedish NPP during a Productive Outage (Safety-train Outage)

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, Erik [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science; Gauthereau, Vincent; Persson, Bodil [Linkoeping Univ. (Sweden). Dept. of Industrial Engineering

    2004-01-01

    This report describes the results from Phase III of a study on Operational Readiness Verification (ORV) that was carried out from December 2002 to November 2003. The work comprised a field study of ORV activities at a Swedish NPP during a planned productive outage, which allowed empirical work to be conducted in an appropriate environment with good accessibility to technical staff. One conclusion from Phase I of this project was the need to look more closely at the differences between three levels or types of tests that occur in ORV: object (component) test, system level test and (safety) function test, and to analyse the different steps of testing in order to understand the nontrivial relations between tests and safety. A second conclusion was the need to take a closer look at the organisation's ability to improvise in the sense of adjusting pre-defined plans to the actual conditions under which they are to be carried out. Phase II of the project found that although all three types of test occurred, they were rather used according to need rather than to a predefined arrangement or procedure. The complexity of ORV could be understood and described by using the concepts of Community of Practice, embedding, and Efficiency-Thoroughness Trade-Off. In addition, organisation and the different communities of practice improvise by adjusting pre-defined plans or work orders to the existing conditions. Such improvisations take place both on the levels of individual actions, on the level of communities of practice, and on the organisational level. The ability to improvise is practically a necessity for work to be carried out, but is also a potential risk. Phase III of the project studied how tasks are adapted relative to the different types of embedding and the degree of correspondence between nominal and actual ORV. It also looked further at the different Communities of Practice that are part of maintenance and ORV, focusing on the coordination and communication between

  13. Siemens capabilities to perform detailed fuel inspections during short outages

    International Nuclear Information System (INIS)

    Knecht, K.; Reparaz, A.

    1999-01-01

    Fuel inspection data are used to support development activities such as corrosion resistant cladding and advanced fuel assembly designs that will reach higher burnups. Increased inspection efforts are necessary to optimize fuel management and performance strategies. Additionally, there is an increasing trend to reduce outage time in Germany and abroad. Siemens has recently developed several timesaving systems for rapid inspection of fuel assemblies and core components. Siemens' focus in developing these systems has been to obtain data in reduced reactor outage time while increasing both the volume and the quality of the measured data. Mast sipping for PWRs is used for identifying leaking fuel assemblies and allows early detection of leaks during downloading of the fuel assemblies from the reactor. An In-Core sipping system for BWRs based on a hood technique to allow testing a full core within 16 hours is under development. (authors)

  14. Outage analysis of opportunistic decode-and-forward relaying

    KAUST Repository

    Tourki, Kamel

    2010-09-01

    In this paper, we investigate a dual-hop opportunistic decode-and-forward relaying scheme where the source may or not be able to communicate directly with the destination. We first derive statistics based on exact probability density function (PDF) of each hop. Then, the PDFs are used to determine closed-form outage probability expression for a transmission rate R. Furthermore, we evaluate the asymptotic outage performance and the diversity order is deduced. Unlike existing works where the analysis focused on high signal-to-noise ratio (SNR) regime, such results are important to enable the designers to take decisions regarding practical systems that operate at low SNR regime. We show that performance simulation results coincide with our analytical results under practical assumption of unbalanced hops. © 2010 IEEE.

  15. Methodology if inspections to carry out the nuclear outages model

    International Nuclear Information System (INIS)

    Aycart, J.; Mortenson, S.; Fourquet, J. M.

    2005-01-01

    Before the nuclear generation industry was deregulated in the United States, refueling and maintenance outages in nuclear power plants usually lasted orotund 100 days. After deregulation took effect, improved capability factors and performances became more important. As a result, it became essential to reduce the critical path time during the outage, which meant that activities that had typically been done in series had to be executed in parallel. The new outage model required the development of new tools and new processes, The 360-degree platform developed by GE Energy has made it possible to execute multiple activities in parallel. Various in-vessel visual inspection (IVVI) equipments can now simultaneously perform inspections on the pressurized reactor vessel (RPV) components. The larger number of inspection equipments in turn results in a larger volume of data, with the risk of increasing the time needed for examining them and postponing the end of the analysis phase, which is critical for the outage. To decrease data analysis times, the IVVI Digitalisation process has been development. With this process, the IVVI data are sent via a high-speed transmission line to a site outside the Plant called Center of Excellence (COE), where a team of Level III experts is in charge of analyzing them. The tools for the different product lines are being developed to interfere with each other as little as possible, thus minimizing the impact of the critical path on plant refueling activities. Methods are also being developed to increase the intervals between inspection. In accordance with the guidelines of the Boiling Water Reactor Vessel and Internals project (BWRVIP), the intervals between inspections are typically longer if ultrasound volumetric inspections are performed than if the scope is limited to IVVI. (Author)

  16. Ontario-U.S. power outages : impacts on critical infrastructure

    International Nuclear Information System (INIS)

    2006-01-01

    This paper described the power outage and resulting blackout that occurred on August 14, 2003 and identified how critical infrastructure was directly and interdependently impacted in Canada. The aim of the paper was to assist critical infrastructure protection and emergency management professionals in assessing the potential impacts of large-scale critical infrastructure disruptions. Information for the study was acquired from Canadian and American media reports and cross-sectoral information sharing with provincial and federal governments and the private sector. The blackout impacted most of the sources and means of generating, transmitting and distributing power within the area, which in turn impacted all critical infrastructure sectors. Landline and cellular companies experienced operational difficulties, which meant that emergency responders were impacted. Newspapers and the electronic media struggled to release information to the public. The banking and finance industry experienced an immediate degradation of services. The power outage caused shipping and storage difficulties for commercial retailers and dairy producers. A number of incidents were reported where only partially treated waste water was released into neighbouring waterways. The timing of the blackout coincided with the closures of workplaces and created additional difficulties on transportation networks. Many gas station pumps were inoperable. Police, fire departments and ambulance services experienced a dramatic increase in the volume of calls received, and all branches of the emergency services sector encountered transportation delays and difficulties with communications equipment. Nuclear reactors were also impacted. An estimated 150,000 Government of Canada employees were unable to report to work. Estimates have indicated that the power outage cost Ontario's economy between $1 and $2 billion. The outage negatively impacted 82 per cent of small businesses in Ontario. 170 refs., 3 figs

  17. Outage probability of distributed beamforming with co-channel interference

    KAUST Repository

    Yang, Liang

    2012-03-01

    In this letter, we consider a distributed beamforming scheme (DBF) in the presence of equal-power co-channel interferers for both amplify-and-forward and decode-and-forward relaying protocols over Rayleigh fading channels. We first derive outage probability expressions for the DBF systems. We then present a performance analysis for a scheme relying on source selection. Numerical results are finally presented to verify our analysis. © 2011 IEEE.

  18. Outage Probability Analysis of FSO Links over Foggy Channel

    KAUST Repository

    Esmail, Maged Abdullah; Fathallah, Habib; Alouini, Mohamed-Slim

    2017-01-01

    Outdoor Free space optic (FSO) communication systems are sensitive to atmospheric impairments such as turbulence and fog, in addition to being subject to pointing errors. Fog is particularly severe because it induces an attenuation that may vary from few dBs up to few hundreds of dBs per kilometer. Pointing errors also distort the link alignment and cause signal fading. In this paper, we investigate and analyze the FSO systems performance under fog conditions and pointing errors in terms of outage probability. We then study the impact of several effective communication mitigation techniques that can improve the system performance including multi-hop, transmit laser selection (TLS) and hybrid RF/FSO transmission. Closed-form expressions for the outage probability are derived and practical and comprehensive numerical examples are suggested to assess the obtained results. We found that the FSO system has limited performance that prevents applying FSO in wireless microcells that have a 500 m minimum cell radius. The performance degrades more when pointing errors appear. Increasing the transmitted power can improve the performance under light to moderate fog. However, under thick and dense fog the improvement is negligible. Using mitigation techniques can play a major role in improving the range and outage probability.

  19. Upgrading BWR training simulators for annual outage operation training

    International Nuclear Information System (INIS)

    Yamakabe, K.; Nakajima, A.; Shiyama, H.; Noji, K.; Okabe, N.; Murata, F.

    2006-01-01

    Based upon the recently developed quality assurance program by the Japanese electric companies, BWR Operator Training Center (BTC) identified the needs to enhance operators' knowledge and skills for operations tasks during annual outage, and started to develop a dedicated operator training course specialized for them. In this paper, we present the total framework of the training course for annual outage operations and the associated typical three functions of our full-scope simulators specially developed and upgraded to conduct the training; namely, (1) Simulation model upgrade for the flow and temperature behavior concerning residual heat removal (RHR) system with shutdown cooling mode, (2) Addition of malfunctions for DC power supply equipment, (3) Simulation model upgrade for water filling operation for reactor pressurization (future development). We have implemented a trial of the training course by using the upgraded 800MW full-scope training simulator with functions (1) and (2) above. As the result of this trial, we are confident that the developed training course is effective for enhancing operators' knowledge and skills for operations tasks during annual outage. (author)

  20. Outage Probability Analysis of FSO Links over Foggy Channel

    KAUST Repository

    Esmail, Maged Abdullah

    2017-02-22

    Outdoor Free space optic (FSO) communication systems are sensitive to atmospheric impairments such as turbulence and fog, in addition to being subject to pointing errors. Fog is particularly severe because it induces an attenuation that may vary from few dBs up to few hundreds of dBs per kilometer. Pointing errors also distort the link alignment and cause signal fading. In this paper, we investigate and analyze the FSO systems performance under fog conditions and pointing errors in terms of outage probability. We then study the impact of several effective communication mitigation techniques that can improve the system performance including multi-hop, transmit laser selection (TLS) and hybrid RF/FSO transmission. Closed-form expressions for the outage probability are derived and practical and comprehensive numerical examples are suggested to assess the obtained results. We found that the FSO system has limited performance that prevents applying FSO in wireless microcells that have a 500 m minimum cell radius. The performance degrades more when pointing errors appear. Increasing the transmitted power can improve the performance under light to moderate fog. However, under thick and dense fog the improvement is negligible. Using mitigation techniques can play a major role in improving the range and outage probability.

  1. Evaluation of treatment efficiency of processes for petroleum refinery`s wastewater

    Energy Technology Data Exchange (ETDEWEB)

    Kee, Kean Chin [National Univ. of Singapore, Kent Ridge (Singapore). Dept. of Civil Engineering

    1993-12-31

    Processes used in the treatment of a petroleum refinery wastewater included initial API oil separator to be followed by dissolved air flotation and extended aeration system. The use of extended aeration biological system proved to be an improvement but not a solution yet in such kind of treatment. 2 refs., 2 tabs.

  2. Evaluation of treatment efficiency of processes for petroleum refinery`s wastewater

    Energy Technology Data Exchange (ETDEWEB)

    Kee, Kean Chin [National Univ. of Singapore, Kent Ridge (Singapore). Dept. of Civil Engineering

    1994-12-31

    Processes used in the treatment of a petroleum refinery wastewater included initial API oil separator to be followed by dissolved air flotation and extended aeration system. The use of extended aeration biological system proved to be an improvement but not a solution yet in such kind of treatment. 2 refs., 2 tabs.

  3. Poland petroleum refinery sludge lagoon demonstration project

    International Nuclear Information System (INIS)

    Altman, D.J.

    2000-01-01

    The US Department of Energy and the Institute for Ecology of Industrial Area have been working together to develop mutually beneficial, cost-effective environmental remediation technologies such as the demonstration of bioremediation techniques for the clean up of acidic petroleum sludge impacted soils at an oil refinery in southern Poland. After an expedited site characterization, treatability study, and a risk assessment study, a remediation strategy was devised. The waste material was composed primarily of high molecular weight paraffinic and polynuclear aromatic hydrocarbons. A biopile design which employed a combination of passive and active aeration in conjunction with nutrient and surfactant application as used to increase the biodegradation of the contaminants of concern

  4. Performance Shaping Factors Assessments and Application to PHWR Outages

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Seung Woo

    2007-02-15

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10{sup -4} more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted

  5. Performance Shaping Factors Assessments and Application to PHWR Outages

    International Nuclear Information System (INIS)

    Lee, Seung Woo

    2007-02-01

    Human reliability analysis is definitely related to the quality of PSA because human errors have been identified as major contributors to PSA. According to NRC's 'Office of analysis and evaluation of operational data (AEOD)',82% of the reactor trips and accident during outage is caused by the events related to human errors. There is, however, no one HRA method universally accepted. Furthermore, HRA during PHWR outages has not been performed around the world yet. HRA during PHWR outages is especially important since manual management of operator is more required during PHWR. In this study, accident scenarios which HYU developed are used to perform a quantification of human error probability. In this study, overall procedures of standard HRA methodology are introduced and follows the quantification of 10 possible selected human actions during PHWR outages based on standard HRA methodology. To see the verification, quantified values were compared with the values from 'Generic CANDU Probabilistic Safety Assessment' and the values estimated by ASEP.Core Damage Frequency was estimated 3.35 x 10 -4 more higher than CDF estimated by AECL data. It was considered that the differences between the HEPs for OPAFW and OPECC3 make CDF higher. Therefore, complementary study of reestimating HEP for OPAFW and OPECC3 in detail is required for increasing the qualities of HRA and PSA. Moreover, one of the difficulties in performing human reliability analysis is to evaluate performance shaping factors which represent the characteristics and circumstances. For assessing a specific human action more exactly, it is necessary to consider all of the PSFs at the same time which makes an effect on the human action. Also, it requires the effect comparison among PSFs to minimize the uncertainties which are usually caused by the subjective judgements of HRA analysts. To see the sensitivity, performance shaping factors of each decision rule are changed which resulted in changes of core damage

  6. 40 CFR 80.1141 - Small refinery exemption.

    Science.gov (United States)

    2010-07-01

    .... (a)(1) Gasoline produced at a refinery by a refiner, or foreign refiner (as defined at § 80.1165(a... effective beginning on January 1 of the following calendar year, at which point the gasoline produced at... from the calculation of its Renewable Volume Obligation (under § 80.1107(a)) gasoline from any refinery...

  7. environmental impact of illegal refineries on the vegetation

    African Journals Online (AJOL)

    Dr. O. M. Adesope

    impact of illegal oil refineries in the Niger Delta, Nigeria, the floristic composition of the fresh water swamp forest at refining sites in two river systems and a brackish ... ecosystem of Rivers State, five species of Mangroves and two species of ... Visual observation was made along the Rivers to identify illegal refinery stations.

  8. Combined environmental impacts from production and use of the products. An EIS-application project for refineries; Sammanvaegd miljoepaaverkan fraan produktion och anvaendning av produkterna. Ett MKB-tillaempningsprojekt foer raffinaderier

    Energy Technology Data Exchange (ETDEWEB)

    Kindbom, K; LoevbIad, G.; Stripple, H.

    2001-12-01

    At European refineries a change in production is planned in order to obtain better qualities of gasoline and diesel, from an environmental point of view. This change will, however, lead to higher emissions at the refineries. The present study of the combined effects of emissions at the refineries and the use of the products gives the opportunity for considering the entire system and gives a stronger positive signal than the traditional EIS would do. Three different methods were used: Net change in emissions to air; Exposure of men and ecosystems for air pollutants; and Exceeding norms and critical levels. The results for the Swedish refinery at Lysekil shows that the emissions from using the products are much higher than the emissions from the refinery for all cases studied. The net emissions from production and use of the products will be reduced for the new products compared to the present situation. Risks for exceeding norms and critical levels due to the changes at the refinery exist for emissions of sulfur and nitrogen oxides, but a lower background load will probably mean that the total future load will be reasonably close to the critical level in the area affected by the refinery. In the urban environment, reduced risks for exceeding the levels for benzen and low levels for toluene and xylene give greater advantages than the increased emissions of sulfur and nitrogen close to the refinery.

  9. Petroleum Refinery Effluents Treatment by Advanced Oxidation Process with Methanol

    Energy Technology Data Exchange (ETDEWEB)

    Shoucheng, Wen [Yangtze Univ., HuBei Jingzhou (China)

    2014-02-15

    Petroleum refinery effluents are waste originating from industries primarily engaged in refining crude oil. It is a very complex compound of various oily wastes, water, heavy metals and so on. Conventional processes are unable to effectively remove the chemical oxygen demand (COD) of petroleum refinery effluents. Supercritical water oxidation (SCWO) was proposed to treat petroleum refinery effluents. In this paper, methanol was used to investigate co-oxidative effect of methanol on petroleum refinery effluents treatment. The results indicated that supercritical water oxidation is an effective process for petroleum refinery effluents treatment. Adding methanol caused an increase in COD removal. When reaction temperature is 440 .deg. C, residence time is 20 min, OE is 0.5 and initial COD is 40000 mg/L, and COD removal increases 8.5%.

  10. Petroleum Refinery Effluents Treatment by Advanced Oxidation Process with Methanol

    International Nuclear Information System (INIS)

    Shoucheng, Wen

    2014-01-01

    Petroleum refinery effluents are waste originating from industries primarily engaged in refining crude oil. It is a very complex compound of various oily wastes, water, heavy metals and so on. Conventional processes are unable to effectively remove the chemical oxygen demand (COD) of petroleum refinery effluents. Supercritical water oxidation (SCWO) was proposed to treat petroleum refinery effluents. In this paper, methanol was used to investigate co-oxidative effect of methanol on petroleum refinery effluents treatment. The results indicated that supercritical water oxidation is an effective process for petroleum refinery effluents treatment. Adding methanol caused an increase in COD removal. When reaction temperature is 440 .deg. C, residence time is 20 min, OE is 0.5 and initial COD is 40000 mg/L, and COD removal increases 8.5%

  11. Reformulated gasoline: Costs and refinery impacts

    International Nuclear Information System (INIS)

    Hadder, G.R.

    1994-02-01

    Studies of reformulated gasoline (RFG) costs and refinery impacts have been performed with the Oak Ridge National Laboratory Refinery Yield Model (ORNL-RYM), a linear program which has been updated to blend gasolines to satisfy emissions constraints defined by preliminary complex emissions models. Policy makers may use the reformulation cost knee (the point at which costs start to rise sharply for incremental emissions control) to set emissions reduction targets, giving due consideration to the differences between model representations and actual refining operations. ORNL-RYM estimates that the reformulation cost knee for the US East Coast (PADD I) is about 15.2 cents per gallon with a 30 percent reduction of volatile organic compounds (VOCs). The estimated cost knee for the US Gulf Coast (PADD III) is about 5.5 cents per gallon with a VOC reduction of 35 percent. Reid vapor pressure (RVP) reduction is the dominant VOC reduction mechanism. Even with anti-dumping constraints, conventional gasoline appears to be an important sink which permits RFG to be blended with lower aromatics and sulfur contents in PADD III. In addition to the potentially large sensitivity of RFG production to different emissions models, RFG production is sensitive to the non-exhaust VOC share assumption for a particular VOC model. ORNL-RYM has also been used to estimate the sensitivity of RFG production to the cost of capital; to the RVP requirements for conventional gasoline; and to the percentage of RFG produced in a refining region

  12. Ratepayers should not fund IP-2 outage, NY Attorney General says

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The New York Attorney General is trying to block Consolidated Edison's effort to pay for an Indian Point nuclear plant outage through the fuel-adjustment clause on the grounds that the utility had repeated system warnings and should have taken action to prevent the leakage of water into the containment building. The utility rejects the assessment of personnel negligence and, blaming equipment failure, plans to replace its heat exchangers. The New York Public Service Commission approved Con Ed's use of the fuel-adjustment clause to pay for replacement power, but agrees that ratepayers should not pay the costs of negligence if the charges are proved. The Attorney General feels that Con Ed could legally challenge a later request for refunds. Other funding possibilities include nuclear-insurance policies or legal action against the equipment manufacturer

  13. On Outage Performance of Spectrum-Sharing Communication over M-Block Fading

    KAUST Repository

    Alabbasi, AbdulRahman

    2015-12-06

    In this paper, we consider a cognitive radio system in which a block-fading channel is assumed. Each transmission frame consists of M blocks and each block undergoes a different channel gain. Instantaneous channel state information about the interference links remains unknown to the primary and secondary users. We minimize the secondary user\\'s targeted outage probability over the block-fading channels. To protect the primary user, a statistical constraint on its targeted outage probability is enforced. The secondary user\\'s targeted outage region and the corresponding optimal power are derived. We also propose two sub-optimal power strategies and derive compact expressions for the corresponding outage probabilities. These probabilities are shown to be asymptotic lower and upper bounds on the outage probability. Utilizing these bounds, we derive the exact diversity order of the secondary user outage probability. Selected numerical results are presented to characterize the system\\'s behavior.

  14. Design Concepts for an Outage Control Center Information Dashboard

    Energy Technology Data Exchange (ETDEWEB)

    Hugo, Jacques Victor [Idaho National Lab. (INL), Idaho Falls, ID (United States); St Germain, Shawn Walter [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thompson, Cheradan Jo [Idaho National Lab. (INL), Idaho Falls, ID (United States); Whitesides, McKenzie Jo [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald Keith [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-12-01

    The nuclear industry, and the business world in general, is facing a rapidly increasing amount of data to be dealt with on a daily basis. In the last two decades, the steady improvement of data storage devices and means to create and collect data along the way influenced the manner in which we deal with information. Most data is still stored without filtering and refinement for later use. Many functions at a nuclear power plant generate vast amounts of data, with scheduled and unscheduled outages being a prime example of a source of some of the most complex data sets at the plant. To make matters worse, modern information and communications technology is making it possible to collect and store data faster than our ability to use it for making decisions. However, in most applications, especially outages, raw data has no value in itself; instead, managers, engineers and other specialists want to extract the information contained in it. The complexity and sheer volume of data could lead to information overload, resulting in getting lost in data that may be irrelevant to the task at hand, processed in an inappropriate way, or presented in an ineffective way. To prevent information overload, many data sources are ignored so production opportunities are lost because utilities lack the ability to deal with the enormous data volumes properly. Decision-makers are often confronted with large amounts of disparate, conflicting and dynamic information, which are available from multiple heterogeneous sources. Information and communication technologies alone will not solve this problem. Utilities need effective methods to exploit and use the hidden opportunities and knowledge residing in unexplored data resources. Superior performance before, during and after outages depends upon the right information being available at the right time to the right people. Acquisition of raw data is the easy part; instead, it is the ability to use advanced analytical, data processing and data

  15. Design Concepts for an Outage Control Center Information Dashboard

    International Nuclear Information System (INIS)

    Hugo, Jacques Victor; St Germain, Shawn Walter; Thompson, Cheradan Jo; Whitesides, McKenzie Jo; Farris, Ronald Keith

    2015-01-01

    The nuclear industry, and the business world in general, is facing a rapidly increasing amount of data to be dealt with on a daily basis. In the last two decades, the steady improvement of data storage devices and means to create and collect data along the way influenced the manner in which we deal with information. Most data is still stored without filtering and refinement for later use. Many functions at a nuclear power plant generate vast amounts of data, with scheduled and unscheduled outages being a prime example of a source of some of the most complex data sets at the plant. To make matters worse, modern information and communications technology is making it possible to collect and store data faster than our ability to use it for making decisions. However, in most applications, especially outages, raw data has no value in itself; instead, managers, engineers and other specialists want to extract the information contained in it. The complexity and sheer volume of data could lead to information overload, resulting in getting lost in data that may be irrelevant to the task at hand, processed in an inappropriate way, or presented in an ineffective way. To prevent information overload, many data sources are ignored so production opportunities are lost because utilities lack the ability to deal with the enormous data volumes properly. Decision-makers are often confronted with large amounts of disparate, conflicting and dynamic information, which are available from multiple heterogeneous sources. Information and communication technologies alone will not solve this problem. Utilities need effective methods to exploit and use the hidden opportunities and knowledge residing in unexplored data resources. Superior performance before, during and after outages depends upon the right information being available at the right time to the right people. Acquisition of raw data is the easy part; instead, it is the ability to use advanced analytical, data processing and data

  16. Use of workstations in the ANAV outage tasks course access

    International Nuclear Information System (INIS)

    Gómez Rodriguez, Carlos A.

    2016-01-01

    The access course for the Asco and Vandellos II Nuclear Power Plants contains all of the training that is considered necessary in compliance with the stipulations of current legislation for the pupils to carry out their activity at the plants. Given the heterogeneity of the special characteristics of those workers who take part in the outage tasks at our plants we have sought to improve the learning values of their access course with the inclusion of Work Stations since 2013. Several changes have been made in the training action since that date to make it more interactive.

  17. Treatment of Tehran refinery wastewater using rotating biological contactor

    Energy Technology Data Exchange (ETDEWEB)

    Ghazi, Masoud; Mirsajadi, Hassan; Ganjidoust, Hossien [Tarbeyat Modarres Univ., Teheran (Iran, Islamic Republic of). Environmental Engineering Dept.

    1993-12-31

    Tehran Refinery is a large plant which produces several petroleum products. The wastewaters are generated from several different refinery processes and units. Because of the wastewaters uniqueness they need to be treated in each specific plant. Currently, an activated sludge system is the main biological wastewater treatment process in Tehran refinery plant. A study was initiated in order to find a more suitable and reliable process which can produce a better treated effluent which might, in case the process be successful, be reused for irrigation lands. 5 refs., 5 figs.

  18. Api Energia IGCC plant is fully integrated with refinery

    Energy Technology Data Exchange (ETDEWEB)

    Del Bravo, R. [api Energia, Rome (Italy); Trifilo, R. [ABB Sadelmi, Milan (Italy); Chiantore, P.V. [api anonima petroli Italiania Spa, Rome (Italy); Starace, F. [ABB Power Generation, Baden (Switzerland); O`Keefe, L.F. [Texico, White Plains (United States)

    1998-06-01

    The api Energia integrated gasification combined cycle (IGCC) plant being built at Falconara Marittima, on Italy`s Adriatic coast, is one of the three IGCC plants under construction in Italy following the liberalization of the electricity production sector. The plant will take 59.2 t/h of high sulphur heavy oil produced by the Falconara refinery, convert it to syngas and use the gas to generate 280 MW of electricity, plus steam and other gases for use in the refinery. The IGCC plant will be highly integrated into the refining process, with a large number of interchanges between the IGCC unit and the rest of the refinery. (author)

  19. Treatment of Tehran refinery wastewater using rotating biological contactor

    Energy Technology Data Exchange (ETDEWEB)

    Ghazi, Masoud; Mirsajadi, Hassan; Ganjidoust, Hossien [Tarbeyat Modarres Univ., Teheran (Iran, Islamic Republic of). Environmental Engineering Dept.

    1994-12-31

    Tehran Refinery is a large plant which produces several petroleum products. The wastewaters are generated from several different refinery processes and units. Because of the wastewaters uniqueness they need to be treated in each specific plant. Currently, an activated sludge system is the main biological wastewater treatment process in Tehran refinery plant. A study was initiated in order to find a more suitable and reliable process which can produce a better treated effluent which might, in case the process be successful, be reused for irrigation lands. 5 refs., 5 figs.

  20. Refinery expansion and upgrading: Trends and needs

    International Nuclear Information System (INIS)

    Sloan, D.E.

    1993-01-01

    Much of the world's reserves of heavy, high sulfur crude oil are located in the western hemisphere. One may look from north to south and find these types of crudes. in Canada, there are the vast deposits of tar sands and other heavy oils. In the United States we find heavy, high sulfur crude in California's San joaquin Valley, the Rockies' shale oil deposits and in other areas. Moving south, Mexico's Maya crude is well known to refiners, as are the heavy crudes of Venezuela's Orinoco Belt. On the other hand, many refineries outside the United States are limited in their ability to handle heavy, high sulfur crudes either because of metallurgy or processing configurations

  1. Energy saving in refineries and petrochemical complexes

    Energy Technology Data Exchange (ETDEWEB)

    Verde, L

    1975-01-01

    Possible measures applicable in the design of refineries and petrochemical complexes, to effect energy savings were investigated. This was not limited to the single process unit problems, on the contrary the attention is mainly addressed to the identification of the interrelations between different units, emphasizing possible integrations. Particularly, the optimization of the pressure levels and number of the utility networks for steam distribution inside plant facilities, is considered, in order to maximize heat recovery in the process units, and electric power production in the central steampower generation plant. A computer program of general application, based on profitability evaluation at various fuel oil prices and different project configurations, has been developed for these purposes. The general measures applicable within certain limits are then briefly examined. The task of the process engineer is discussed in the perspective of the ''energy saving'' goal.

  2. Electrometallurgy of copper refinery anode slimes

    Science.gov (United States)

    Scott, J. D.

    1990-08-01

    High-selenium copper refinery anode slimes form two separate and dynamically evolving series of compounds with increasing electrolysis time. In one, silver is progressively added to non-stoichiometric copper selenides, both those originally present in the anode and those formed subsequently in the slime layer, and in the other, silver-poor copper selenides undergo a dis-continuous crystallographic sequence of anodic-oxidative transformations. The silver-to-selenium molar ratio in the as-cast anode and the current density of electrorefining can be used to construct predominance diagrams for both series and, thus, to predict the final bulk “mineralogy” of the slimes. Although totally incorrect in detail, these bulk data are sufficiently accurate to provide explanations for several processing problems which have been experienced by Kidd Creek Division, Falconbridge Ltd., in its commercial tankhouse. They form the basis for a computer model which predicts final cathode quality from chemical analyses of smelter feed.

  3. The costs of power outages: A case study from Cyprus

    International Nuclear Information System (INIS)

    Zachariadis, Theodoros; Poullikkas, Andreas

    2012-01-01

    We study the costs of electricity disruptions in Cyprus, which suffered severe power shortages in summer 2011 after an explosion that destroyed 60% of its power generating capacity. We employ both economic and engineering approaches to assess these costs. Among other calculations, we provide estimates of the value of lost load by economic sector and the hourly value of electricity by season and type of day. The results of two economic methods employed to assess welfare losses differ largely, indicating that the assessment of outage costs is associated with many uncertainties. Our calculations show that the emergency actions taken by national energy authorities in response to that accident, though not necessarily optimal, have generally been appropriate and in line with international best practices: the additional costs incurred due to these measures are lower than the economic losses avoided thanks to these actions. Preferential treatment of specific consumer types in the case of repeated power outages remains an open policy question. - Highlights: ► We evaluate the response of energy authorities to a sudden electricity crisis. ► We combine two top-down economic methods and a bottom-up engineering approach. ► We estimate the value of lost electricity by hour, day type and season. ► The response of energy authorities turned out to be effective. ► Costs of emergency actions were lower than the economic losses avoided.

  4. Radiological protection for the ANGRA 1 steam generator replacement outage

    International Nuclear Information System (INIS)

    Oliveira, Magno Jose de; Amaral, Marcos Antonio do; Minelli, Edson; Ferreira, William Alves

    2009-01-01

    The Angra 1 Nuclear Power Plant (NPP) is a Westinghouse two-loop plant with net output before its 1P16 Outage of 632 MWe, with the Old Steam Generators (OSG) type model D3, which were replaced by two new Steam Generators with feed water-ring system. Localized in Angra dos Reis, Rio de Janeiro - Brazil, Angra 1 started in commercial operation in 1985 and, from the beginning problems related to corrosion have appeared in the Inconel 600 alloy of the tubes. The corrosion problems indicated the necessity for a strong control of the tubes thicknesses and, after a time, the ELETRONUCLEAR decided to replace the OSG. In 2009, ELETRONUCLEAR initiated in January 24, the actions for the Steam Generators Replacement - SGR. During the SGR process, several controls were applied in field, which made possible to have no radiological accidents, no dose limits exceeded, and permitted to achieve a very good result in terms of Collective Dose. This paper describes the radiological controls applied for the Angra 1 Steam Generator Replacement Outage, the radiological protection team sizing and distribution and the obtained results. (author)

  5. Outage Analysis of Asymmetric RF-FSO Systems

    KAUST Repository

    Ansari, Imran Shafique

    2017-03-20

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channels cascaded with free-space optical (FSO) links is presented. The RF links are modeled by the Rayleigh fading distribution and the FSO links are modeled by Malaga (M) turbulence distribution. The FSO links account for pointing errors and both types of detection techniques (i.e. heterodyne detection as well as intensity modulation/direct detection (IM/DD)). Transmit diversity is applied at the source, selection combining is applied at the destination, and the relay is equipped with single RF receive antenna and single aperture for relaying the information over FSO links. With this model, a new exact closed-form expression is derived for the outage probability of the end-to- end signal-to-noise ratio of such communication systems in terms of the Meijer\\'s G function under fixed amplify-and-forward relay scheme. All new analytical results are verified via computer-based Monte-Carlo simulations and are illustrated by some selected numerical results.

  6. Evaluation of allowed outage time using PRA results

    International Nuclear Information System (INIS)

    Johanson, G.

    1985-01-01

    In a probabilistic risk assessment (PRA) different measures of risk importance can be established. These measures can be used as a basis for further evaluation and determination of allowed outage time for specific components, within safety systems of a nuclear power plant. In order to optimize the allowed outage time (AOT) stipulated in the plant's Technical Specification it is necessary to create a methodology which could incorporate existing PRA data into a quantitative extrapolation. In order to evaluate the plant risk status due to AOT in a quantitative manner, the risk achievement worth is utilized. Risk achievement worth is defined as follows: to measure the worth of a feature, in achieving the present risk, one approach is to remove the feature and then determine how much the risk has increased. Thus, the risk achievement worth is formally defined to be the increase in risk if the feature were assumed not be there or to be failed. Another parameter of interest for this analysis is the shutdown risk increase. The shutdown risk achievement worth must be incorporated into the accident sequence risk achievement worth to arrive at an optimal set of plant specific AOTs

  7. Outage analysis for underlay cognitive networks using incremental regenerative relaying

    KAUST Repository

    Tourki, Kamel

    2013-02-01

    Cooperative relay technology has recently been introduced into cognitive radio (CR) networks to enhance the network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service (QoS) of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. Analysis is conducted for two schemes, referred to as the channel-state information (CSI)-based and fault-tolerant schemes, respectively, where different amounts of CSI were considered. We first provide the exact cumulative distribution function (cdf) of the received signal-to-noise ratio (SNR) over each hop with colocated relays. Then, the cdf\\'s are used to determine a very accurate closed-form expression for the outage probability for a transmission rate $R$. In a high-SNR region, a floor of the secondary outage probability occurs, and we derive its corresponding expression. We validate our analysis by showing that the simulation results coincide with our analytical results in Rayleigh fading channels. © 1967-2012 IEEE.

  8. APPROACH TO ASSESSING THE PREPAREDNESS OF HOSPITALS TO POWER OUTAGES

    Directory of Open Access Journals (Sweden)

    Lenka BREHOVSKÁ

    2017-06-01

    Full Text Available Within the secondary impacts of electricity blackouts, it is necessary to pay attention to facilities providing medical care for the population, namely the hospitals. Hospitals represent a key position in the provision of health care also in times of crisis. These facilities must provide constant care; it is therefore essential that the preparedness of such facilities is kept at a high level. The basic aim of this article is to analyse the preparedness of hospitals to power outages (power failures, blackouts within a pilot study. On that basis, a SWOT analysis is used to determine strengths and weaknesses of the system of preparedness of hospitals to power outages and solutions for better security of hospitals are defined. The sample investigated consists of four hospitals founded by the Regional Authority (hospitals Nos. 1-4 and one hospital founded by the Ministry of Health of the Czech Republic (hospital No. 5. The results of the study shows that most weaknesses of the preparedness of hospitals are represented by inadequately addressed reserves of fuel for the main backup power supply, poor knowledge of employees who are insufficiently retrained, and old backup power supplies (even 35 years in some cases.

  9. Limiting the impact of recent outage experience in a midsize university reactor environment

    International Nuclear Information System (INIS)

    Vernetson, W.G.

    1996-01-01

    The University of Florida Training Reactor (UFTR) is a light-water-cooled, graphite- and light-water-moderated, modified Argonaut-type reactor licensed to operate at steady-state power levels up to 100 kW. The UFTR continues to utilize high-enriched materials test reactor-type fuel in a piping circuit type of system versus the more familiar pool reactor design. Though somewhat limited for research and service, the UFTR is a valuable educational facility. Despite its relatively low power level, the two-slab core configuration provides a peak thermal flux near 2 x 10 12 n/cm 2 · s; in addition, other modifications and experimental adaptations have been implemented in the 36-yr history of the facility to enhance the potential of the facility for diverse types of unique educational usage. Its small physical size in a loop configuration makes it a good teaching tool, but it can also be associated with unique maintenance problems, as in this case. The mission of the UFTR is to serve regional needs for access to quality reactor usage in a variety of areas to support educational and training needs as well as research and service, including public information about nuclear energy. As the only nonpower reactor in the state of Florida in affiliation with an established and diverse nuclear and radiological engineering department, it has a strong role to play in education, training, research, and service, especially the former. As a result of its unique position, the facility has been quite successful in its mission. With so much educational usage scheduled, sometimes for classes arriving from 100 miles away, it is important to avoid unexpected outages as well as unexpectedly lengthy outages. Such planning usually is successful and has allowed the RFTR to build a clientele of more than four dozen regular educational users, although events in 1995 could have undetermined this effort

  10. Integration : OPEC is now in 35 foreign refineries

    International Nuclear Information System (INIS)

    Terzian, P.

    1994-01-01

    Seven countries from OPEC own now share holdings in 35 foreign refineries. By this process of downstream reintegration, these countries hope to reach a better stability of crude oil prices. (Author). 3 tabs

  11. Influence of ownership capital structure of Refinery's operation and development

    International Nuclear Information System (INIS)

    Hadzhi-Mishev, Dimitar

    1999-01-01

    Refineries are part of the energetic infrastructure of one country. Their significance is dependent on the geographic country position (whether it has sea exit or not), and on structure of primary energy spends in the country. According these facts, country's attitude to the refineries on its territory could be different. The possibility of ownership structure transformation in refineries and necessary legislation in the energetic sector of the state, needed for transformation realization are analyzed in this paper. Essential conditions for transformation fulfilling are protection 'mechanisms for domestic production in crude oil economy, manners of crude oil products price defining, and manners of excise determination and payment. As a function of these conditions, the conditions under which transformation of ownership structure in refineries is possible, as well as their influence on the operation and development of this part of energetic structure in transition country are defined in this paper. (Original)

  12. Assessment of the effect of effluent discharge from coffee refineries ...

    African Journals Online (AJOL)

    Admin

    2Department of Environmental Health, Jimma University, Jimma, Ethiopia. ... cherries, transport them hydraulically through the pulping ..... Table 2. Interaction effects of effluent discharges by coffee refineries on physical characteristics between.

  13. Valve automation in Indian refinery; Armaturenautomatisierung in indischer Raffinerie

    Energy Technology Data Exchange (ETDEWEB)

    Herbstritt, M. [AUMA Riester GmbH und Co. KG, Muellheim (Germany)

    2006-12-15

    The Mahul refinery near Mumbai is the third largest site of its kind in India. It is operated by BPCL, Bharat Petroleum Corporation Ltd. During the last few months, the refinery was extended. A plant for manufacturing motor lubricants was built, together with a tank farm for the products (LOBS = lube oil base stock). In April 2006 the new plant sections were put into operation. This article deals with the valve automation for this project. (orig.)

  14. Seasonal and Local Characteristics of Lightning Outages of Power Distribution Lines in Hokuriku Area

    Science.gov (United States)

    Sugimoto, Hitoshi; Shimasaki, Katsuhiko

    The proportion of the lightning outages in all outages on Japanese 6.6kV distribution lines is high with approximately 20 percent, and then lightning protections are very important for supply reliability of 6.6kV lines. It is effective for the lightning performance to apply countermeasures in order of the area where a large number of the lightning outages occur. Winter lightning occurs in Hokuriku area, therefore it is also important to understand the seasonal characteristics of the lightning outages. In summer 70 percent of the lightning outages on distribution lines in Hokuriku area were due to sparkover, such as power wire breakings and failures of pole-mounted transformers. However, in winter almost half of lightning-damaged equipments were surge arrester failures. The number of the lightning outages per lightning strokes detected by the lightning location system (LLS) in winter was 4.4 times larger than that in summer. The authors have presumed the occurrence of lightning outages from lightning stroke density, 50% value of lightning current and installation rate of lightning protection equipments and overhead ground wire by multiple regression analysis. The presumed results suggest the local difference in the lightning outages.

  15. Use of collaboration software to improve nuclear power plant outage management

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn

    2015-02-01

    Nuclear Power Plant (NPP) refueling outages create some of the most challenging activities the utilities face in both tracking and coordinating thousands of activities in a short period of time. Other challenges, including nuclear safety concerns arising from atypical system configurations and resource allocation issues, can create delays and schedule overruns, driving up outage costs. Today the majority of the outage communication is done using processes that do not take advantage of advances in modern technologies that enable enhanced communication, collaboration and information sharing. Some of the common practices include: runners that deliver paper-based requests for approval, radios, telephones, desktop computers, daily schedule printouts, and static whiteboards that are used to display information. Many gains have been made to reduce the challenges facing outage coordinators; however; new opportunities can be realized by utilizing modern technological advancements in communication and information tools that can enhance the collective situational awareness of plant personnel leading to improved decision-making. Ongoing research as part of the Light Water Reactor Sustainability Program (LWRS) has been targeting NPP outage improvement. As part of this research, various applications of collaborative software have been demonstrated through pilot project utility partnerships. Collaboration software can be utilized as part of the larger concept of Computer-Supported Cooperative Work (CSCW). Collaborative software can be used for emergent issue resolution, Outage Control Center (OCC) displays, and schedule monitoring. Use of collaboration software enables outage staff and subject matter experts (SMEs) to view and update critical outage information from any location on site or off.

  16. Outage Analysis of Spectrum-Sharing over M-Block Fading with Sensing Information

    KAUST Repository

    Alabbasi, Abdulrahman; Rezki, Zouheir; Shihada, Basem

    2016-01-01

    on the outage probability with tractable expressions. These bounds allow us to derive the exact diversity order of the secondary user’s outage probability. To further enhance the system’s performance, we also investigate the impact of including the sensing

  17. Allowable outage analysis for the LOFT CIS and reflood assist bypass valves

    International Nuclear Information System (INIS)

    Trainer, J.E.; Matthews, S.D.

    1977-06-01

    To determine the outage time allowable for a typical 1 of 2 redundant valve configuration, a Markov model was created to analyze the various operating states for the valves. Since no performance criteria have been specified, an availability model was constructed with regard to the valve outage

  18. Taking inventory on VOC releases from Amoco's Yorktown refinery

    International Nuclear Information System (INIS)

    Klee, H.H. Jr.; Schmitt, R.E.; Harrass, M.C.; Podar, M.K.

    1996-01-01

    Amoco's Yorktown, Virginia, refinery is a 35-year-old, 53,000 bbl/day facility that manufacturers gasoline, heating oil, liquid petroleum gas, sulfur, and coke. In a cooperative and voluntary effort, Amoco Corporation and the US Environmental Protection Agency conducted a joint project to study pollution prevention opportunities at an operating industrial facility. Source reduction efforts--key to pollution prevention strategies--require knowledge of specific sources of releases. However, data on releases from individual process units are limited in favor of data to monitor existing end-of-pipe pollution control requirements. The study's sampling program sought to portray the distribution of releases within the refinery, their management within the refinery, and ultimate releases leaving the refinery. Subsequent tests of blowdown stack and fugitive emissions further improved total release estimates. The initial study estimated that the refinery generates about 25,000 metric tons (t)/year of potential pollutants. Of these, about half are released from the refinery as airborne, waterborne, or land-disposed releases. Airborne releases comprise the majority of releases by mass, about 12,000 t/year. Most of the airborne releases are volatile organic compound hydrocarbons. The inventory sampling project and subsequent work identified differences with Toxic Release Inventory (TRI) values and standard emission factors (AP-42). The inventory and other data provided an opportunity to consider options for, and limitations of, specific pollution prevention or source reduction strategies

  19. Assessment of Petroleum Leakage in Groundwater of the Abadan Refinery

    Directory of Open Access Journals (Sweden)

    Seyed Reza Shadizadeh

    2010-06-01

    Full Text Available Knowledge of petroleum leakage at oil refineries is vital for environmental study of water and soil pollution. Abadan Refinery is located between the Arvandrud and Bahmanshir rivers in the highly populated area of Abadan city. These rivers supply domestic, industrial, and agricultural water toAbadancity. During the war betweenIranandIraq, enormous volumes of oil and petroleum products leaked from storage tanks and pipelines at Abadan Refinery into the surrounding environment. The resulting pollution is a serious threat and a growing environmental concern for the region. In this work, twenty boreholes were dug to investigate petroleum leaks into the surrounding area both during and after the war. The thickness of petroleum floating on underground waters at the refinery was measured by sampling underground water over a period of one year along with measuring the piezometric heads of groundwater monitoring wells. Also, groundwater movement pattern at Abadan Refinery was determined by measuring the water table in each well over the same period. The results of sampling indicate that oil leaks were observed in just two wells; namely, wells No.3 and No.11. The results also show that the greatest portion of the oil spill in underground layers at Abadan Refinery was absorbed into clay soil.

  20. Underlay Cognitive Radio Systems with Improper Gaussian Signaling: Outage Performance Analysis

    KAUST Repository

    Amin, Osama

    2016-03-29

    Improper Gaussian signaling has the ability over proper (conventional) Gaussian signaling to improve the achievable rate of systems that suffer from interference. In this paper, we study the impact of using improper Gaussian signaling on the performance limits of the underlay cognitive radio system by analyzing the achievable outage probability of both the primary user (PU) and secondary user (SU). We derive the exact outage probability expression of the SU and construct upper and lower bounds of the PU outage probability which results in formulating an approximate expression of the PU outage probability. This allows us to design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the derived expressions for both the SU and the PU and the corresponding adaptive algorithms by numerical results.

  1. Estimating Power Outage Cost based on a Survey for Industrial Customers

    Science.gov (United States)

    Yoshida, Yoshikuni; Matsuhashi, Ryuji

    A survey was conducted on power outage cost for industrial customers. 5139 factories, which are designated energy management factories in Japan, answered their power consumption and the loss of production value due to the power outage in an hour in summer weekday. The median of unit cost of power outage of whole sectors is estimated as 672 yen/kWh. The sector of services for amusement and hobbies and the sector of manufacture of information and communication electronics equipment relatively have higher unit cost of power outage. Direct damage cost from power outage in whole sectors reaches 77 billion yen. Then utilizing input-output analysis, we estimated indirect damage cost that is caused by the repercussion of production halt. Indirect damage cost in whole sectors reaches 91 billion yen. The sector of wholesale and retail trade has the largest direct damage cost. The sector of manufacture of transportation equipment has the largest indirect damage cost.

  2. Underlay Cognitive Radio Systems with Improper Gaussian Signaling: Outage Performance Analysis

    KAUST Repository

    Amin, Osama; Abediseid, Walid; Alouini, Mohamed-Slim

    2016-01-01

    Improper Gaussian signaling has the ability over proper (conventional) Gaussian signaling to improve the achievable rate of systems that suffer from interference. In this paper, we study the impact of using improper Gaussian signaling on the performance limits of the underlay cognitive radio system by analyzing the achievable outage probability of both the primary user (PU) and secondary user (SU). We derive the exact outage probability expression of the SU and construct upper and lower bounds of the PU outage probability which results in formulating an approximate expression of the PU outage probability. This allows us to design the SU signal by adjusting its transmitted power and the circularity coefficient to minimize the SU outage probability while maintaining a certain PU quality-of-service. Finally, we evaluate the derived expressions for both the SU and the PU and the corresponding adaptive algorithms by numerical results.

  3. Exact Outage Probability of Dual-Hop CSI-Assisted AF Relaying Over Nakagami-m Fading Channels

    KAUST Repository

    Xia, Minghua; Aissa, Sonia; Wu, Yik-Chung

    2012-01-01

    to evaluate the outage performance of the system under study. The analytical results of outage probability coincide exactly with Monte-Carlo simulation results and outperform the previously reported upper bounds in the low and medium SNR regions.

  4. The Role of Occupational Health and Safety in Complex Outage Services to NPPs

    International Nuclear Information System (INIS)

    Rozman, A.; Androjna, A.

    2010-01-01

    Meeting outage schedules in NPPs which are increasingly demanding, apart from all other aspects, introduces a new perspective on occupational health and safety (OHS). Not only is the OHS a constituent part of a plant's overall outage management, it above all dictates paramount objectives to outage service providers. The paper reviews the impacts of reductions of outage durations on OHS and presents related experience of the leading Slovenian outage services provider, NUMIP d.o.o. over the last ten years. The company is now getting prepared for its 12th outage at Krsko NPP in 2010, and has not have recorded a major injury so far, even though these projects engaged over 450 people at a time on-site. To achieve such results, a lot of emphasis is being put onto OHS management prior to and during outages. A certified OHSAS 18001 system has been established and implemented to further support preparation and execution of NUMIP's outage activities at Krsko NPP, and also for other projects. An effective continuous improvement system is built into the project, providing for implementation of lessons learned from domestic and foreign plants. To illustrate the topic in more detail, a case on a Seismic protection of polar crane project is presented. It took place in the 2009 Outage and has certainly been one of the most demanding projects from the OHS point of view for NUMIP so far. The paper aims at contributing to a better understanding of the role of effective management of OHS on the side of a service provider, and, consequently, in the overall outage success of a plant.(author).

  5. High-Rate Communications Outage Recorder Operations for Optimal Payload and Science Telemetry Management Onboard the International Space Station

    Science.gov (United States)

    Shell, Michael T.; McElyea, Richard M. (Technical Monitor)

    2002-01-01

    All International Space Station (ISS) Ku-band telemetry transmits through the High-Rate Communications Outage Recorder (HCOR). The HCOR provides the recording and playback capability for all payload, science, and International Partner data streams transmitting through NASA's Ku-band antenna system. The HCOR is a solid-state memory recorder that provides recording capability to record all eight ISS high-rate data during ISS Loss-of-Signal periods. NASA payloads in the Destiny module are prime users of the HCOR; however, NASDA and ESA will also utilize the HCOR for data capture and playback of their high data rate links from the Kibo and Columbus modules. Marshall Space Flight Center's Payload Operations Integration Center manages the HCOR for nominal functions, including system configurations and playback operations. The purpose of this paper is to present the nominal operations plan for the HCOR and the plans for handling contingency operations affecting payload operations. In addition, the paper will address HCOR operation limitations and the expected effects on payload operations. The HCOR is manifested for ISS delivery on flight 9A with the HCOR backup manifested on flight 11A. The HCOR replaces the Medium-Rate Communications Outage Recorder (MCOR), which has supported payloads since flight 5A.1.

  6. Protective Controller against Cascade Outages with Selective Harmonic Compensation Function

    Science.gov (United States)

    Abramovich, B. N.; Kuznetsov, P. A.; Sychev, Yu A.

    2018-05-01

    The paper presents data on the power quality and development of protective devices for the power networks with distributed generation (DG).The research has shown that power quality requirements for DG networks differ from conventional ones. That is why main tendencies, protective equipment and filters should be modified. There isa developed algorithm for detection and prevention of cascade outages that can lead to the blackoutin DG networks and there was a proposed structural scheme for a new active power filter for selective harmonics compensation. Analysis of these theories and equipment led to the development of protective device that could monitor power balance and cut off non-important consumers. The last part of the article describes a microcontroller prototype developed for connection to the existing power station control center.

  7. Braess's paradox in oscillator networks, desynchronization and power outage

    International Nuclear Information System (INIS)

    Witthaut, Dirk; Timme, Marc

    2012-01-01

    Robust synchronization is essential to ensure the stable operation of many complex networked systems such as electric power grids. Increasing energy demands and more strongly distributing power sources raise the question of where to add new connection lines to the already existing grid. Here we study how the addition of individual links impacts the emergence of synchrony in oscillator networks that model power grids on coarse scales. We reveal that adding new links may not only promote but also destroy synchrony and link this counter-intuitive phenomenon to Braess's paradox known for traffic networks. We analytically uncover its underlying mechanism in an elementary grid example, trace its origin to geometric frustration in phase oscillators, and show that it generically occurs across a wide range of systems. As an important consequence, upgrading the grid requires particular care when adding new connections because some may destabilize the synchronization of the grid—and thus induce power outages. (paper)

  8. Outage analysis for underlay relay-assisted cognitive networks

    KAUST Repository

    Tourki, Kamel; Qaraqe, Khalid A.; Alouini, Mohamed-Slim

    2012-01-01

    Cooperative relay technology was recently introduced into cognitive radio networks in order to enhance network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. We first provide the exact cumulative density function (CDF) of received signal-to-noise (SNR) over each hop with co-located relays. Then, the CDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. We validate our analysis by showing that simulation results coincide with our analytical results in Rayleigh fading channels. © 2012 IEEE.

  9. Asymmetric Hardware Distortions in Receive Diversity Systems: Outage Performance Analysis

    KAUST Repository

    Javed, Sidrah; Amin, Osama; Ikki, Salama S.; Alouini, Mohamed-Slim

    2017-01-01

    This paper studies the impact of asymmetric hardware distortion (HWD) on the performance of receive diversity systems using linear and switched combining receivers. The asymmetric attribute of the proposed model motivates the employment of improper Gaussian signaling (IGS) scheme rather than the traditional proper Gaussian signaling (PGS) scheme. The achievable rate performance is analyzed for the ideal and non-ideal hardware scenarios using PGS and IGS transmission schemes for different combining receivers. In addition, the IGS statistical characteristics are optimized to maximize the achievable rate performance. Moreover, the outage probability performance of the receive diversity systems is analyzed yielding closed form expressions for both PGS and IGS based transmission schemes. HWD systems that employ IGS is proven to efficiently combat the self interference caused by the HWD. Furthermore, the obtained analytic expressions are validated through Monte-Carlo simulations. Eventually, non-ideal hardware transceivers degradation and IGS scheme acquired compensation are quantified through suitable numerical results.

  10. Outage analysis for underlay relay-assisted cognitive networks

    KAUST Repository

    Tourki, Kamel

    2012-12-01

    Cooperative relay technology was recently introduced into cognitive radio networks in order to enhance network capacity, scalability, and reliability of end-to-end communication. In this paper, we investigate an underlay cognitive network where the quality of service of the secondary link is maintained by triggering an opportunistic regenerative relaying once it falls under an unacceptable level. We first provide the exact cumulative density function (CDF) of received signal-to-noise (SNR) over each hop with co-located relays. Then, the CDFs are used to determine very accurate closed-form expression for the outage probability for a transmission rate R. We validate our analysis by showing that simulation results coincide with our analytical results in Rayleigh fading channels. © 2012 IEEE.

  11. Asymmetric Hardware Distortions in Receive Diversity Systems: Outage Performance Analysis

    KAUST Repository

    Javed, Sidrah

    2017-02-22

    This paper studies the impact of asymmetric hardware distortion (HWD) on the performance of receive diversity systems using linear and switched combining receivers. The asymmetric attribute of the proposed model motivates the employment of improper Gaussian signaling (IGS) scheme rather than the traditional proper Gaussian signaling (PGS) scheme. The achievable rate performance is analyzed for the ideal and non-ideal hardware scenarios using PGS and IGS transmission schemes for different combining receivers. In addition, the IGS statistical characteristics are optimized to maximize the achievable rate performance. Moreover, the outage probability performance of the receive diversity systems is analyzed yielding closed form expressions for both PGS and IGS based transmission schemes. HWD systems that employ IGS is proven to efficiently combat the self interference caused by the HWD. Furthermore, the obtained analytic expressions are validated through Monte-Carlo simulations. Eventually, non-ideal hardware transceivers degradation and IGS scheme acquired compensation are quantified through suitable numerical results.

  12. South Africa's refineries: waiting for Maduna

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A definitive energy policy from the new Energy Minister, Penuell Maduna, is awaited by the petroleum industry in South Africa. Some of the complexities of the South African oil market and past legacies which make the task of producing a policy difficult, are examined here. They include the allegations made initially in 1994 that oil refineries are illegally repatriating profits by paying too much for imported products. Accusations of this transfer pricing have resurfaced in the light of recent figures published by the South African Petroleum Industry Association (SAPIA) which show that the oil industry's profitability is not as high as some had presumed. However, compelling evidence for the allegations has not appeared and it is unlikely that the foreign investors in SAPIA would endanger their operations in this way. SAPIA members are key investors in the national infrastructure and make large tax contributions much needed by the treasury. In its turn, SAPIA is unhappy about the continuation of the payment of large taxpayer funded subsidies to the privatised Sasol, the South African synthetic fuel company, seeing as anti-competitive and having negative implications for the national economy. For its part Sasol argues its entitlement to the same tariff protection enjoyed by 80% of local manufacturing industries in South Africa. Some government action has been taken to reduce the subsidies though. The oil companies in SAPIA require clarity on future energy policy and deregulation before committing themselves to further heavy capital investment and Sasol also requires an end to the present uncertainties. (UK)

  13. Catalytic hydrotreatment of refinery waste: Demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    The object of this project and report is to produce liquid hydrocarbons by the catalytic hydroprocessing of solid refinery wastes (hard pitches) in order to improve the profitability of deep conversion processes and reduce the excess production of heavy fuels. The project was mostly carried out on the ASVAHL demonstration platform site, at Solaize, and hard pitches were produced primarily by deasphalting of atmospheric or vacuum distillation residues. The project includes two experimental phases and an economic evaluation study phase. In Phase 1, two granular catalysts were used to transform pitch into standard low sulfur fuel oil: a continuously moving bed, with demetallation and conversion catalyst; a fixed bed, with hydrorefining catalyst. In Phase 2 of the project, it was proven that a hydrotreatment process using a finely dispersed catalyst in the feedstock, can, under realistic operating conditions, transform with good yields hard pitch into distillates that can be refined through standard methods. In Phase 3 of the project, it was shown that the economics of such processes are tightly linked to the price differential between white'' and black'' oil products, which is expected to increase in the future. Furthermore, the evolution of environmental constraints will impel the use of such methods, thus avoiding the coproduction of polluting solid residues. 11 figs., 1 tab.

  14. Enhanced outage prediction modeling for strong extratropical storms and hurricanes in the Northeastern United States

    Science.gov (United States)

    Cerrai, D.; Anagnostou, E. N.; Wanik, D. W.; Bhuiyan, M. A. E.; Zhang, X.; Yang, J.; Astitha, M.; Frediani, M. E.; Schwartz, C. S.; Pardakhti, M.

    2016-12-01

    The overwhelming majority of human activities need reliable electric power. Severe weather events can cause power outages, resulting in substantial economic losses and a temporary worsening of living conditions. Accurate prediction of these events and the communication of forecasted impacts to the affected utilities is necessary for efficient emergency preparedness and mitigation. The University of Connecticut Outage Prediction Model (OPM) uses regression tree models, high-resolution weather reanalysis and real-time weather forecasts (WRF and NCAR ensemble), airport station data, vegetation and electric grid characteristics and historical outage data to forecast the number and spatial distribution of outages in the power distribution grid located within dense vegetation. Recent OPM improvements consist of improved storm classification and addition of new predictive weather-related variables and are demonstrated using a leave-one-storm-out cross-validation based on 130 severe extratropical storms and two hurricanes (Sandy and Irene) in the Northeast US. We show that it is possible to predict the number of trouble spots causing outages in the electric grid with a median absolute percentage error as low as 27% for some storm types, and at most around 40%, in a scale that varies between four orders of magnitude, from few outages to tens of thousands. This outage information can be communicated to the electric utility to manage allocation of crews and equipment and minimize the recovery time for an upcoming storm hazard.

  15. Reliabilty worth: Development of a relationship with outage magnitude, duration and frequency

    International Nuclear Information System (INIS)

    Turner, F.P.P.; Katrichak, A.M.; Dwyer, A.; Edwards, D.; Ibrahim, A.

    1994-01-01

    British Columbia Hydro's Worth Project Team was founded to determine values for reliability for reference in evaluation of investment and operating decisions. Work to date has produced key preliminary values for specific outages and concepts for the shape of the relationship between value and these determinates of reliability worth, frequency, magnitude and duration. These values and concepts are described. The values are developed through an iterative, trial and refinement approach. The approach incorporates direct input from customers, common sense and judgement, and micro- and macro-economic concepts. Reliability worth values for reduced or prevented outages are presented for residential, commercial, small industrial and mixed sectors and various outage durations. Reliability worth values were obtained through customer surveys. Limitations of the reliability worth value are numerous and are listed. Study of cost vs magnitude of interruption using microeconomic models has shown that costly system improvements to reduce the possibility of widespread outages may not be justified. The case of exceptionally large area outages (blackouts) is examined. The cost vs frequency relationship was examined in terms of the economic concept of utility or satisfaction. Different loss/frequency characteristics are demonstrated for different customer classes. Customer value for reduced outage duration is expressed in a curve with flatter slope than that for eliminated outages. 2 refs., 6 figs

  16. Use of a Computerized Tool (ORAM) to Help Manage Outage Safety and Risk at NPP Krsko

    International Nuclear Information System (INIS)

    Spiler, J.; Basic, I.; Vrbanic, I.; Fifnja, I.; Kastelan, M.; Dagan, W. J.; Shanley, L. B.; Naum, T. J.

    1998-01-01

    Outage Risk Assessment and Management (ORAM) is a computerized methodology developed by the U.S. Electric Power Research Institute (EPRI) to help Nuclear Power Plant personnel manage the risk and safety associated with refueling and forced plant outages. Today, over 60 plants including NPP Krsko are using ORAM during the preparation and performance of plant outages. In fact, many plants are attributing much of the reductions in the duration of refueling outages to the use of ORAM. The success of the ORAM methodology is the capability to provide plant and management personnel with understandable results from both deterministic evaluations of plant safety and quantitative risk assessments. The Nuklearna Elektrarna Krsko (NEK) use of ORAM involves both of these approaches. The deterministic portion of ORAM is used to model the NPP Krsko Shutdown Technical Specifications and administrative considerations. The probabilistic portion of ORAM uses industry and NEK specific initiating events and other risk elements pertaining to shutdown to derive a quantitative risk assessment for various end states, including core damage and RCS boiling. This paper expands on the value of each approach and demonstrates the benefits of combining these elements in the decision-making process. Another key advantage of ORAM is the ability to apply the methodology to specific outages. Since no outage is identical, this provides tremendous benefits to plant personnel for managing the safety and risk of a particular outage. ORAM does this ba organizing all of the various plant configurations and equipment unavailability windows into numerous plant states. Furthermore, ORAM evaluations can be a utomated b y interfacing with outage scheduling software programs such as Primavera. For each plant state, the deterministic and the probabilistic logic evaluations are applied. This paper will demonstrate the ORAM evaluation for an actual NPP Krsko outage. (author)

  17. Transformation of the Czech refinery and petrochemical

    International Nuclear Information System (INIS)

    Junek, V.

    1995-01-01

    The petrochemical and chemical industries in former Czechoslovakia in the period after World War II was built up with a purpose to create a complex whose individual subjects would be closely interlinked from the point of view of their production programmes. The separation of Slovakia as an independent state has disrupted some of these links. In spite of that the petrochemical and chemical industries are nowadays the most prosperous branches of economy of the Czech Republic. The governmental proposal for the reorganizing of the refinery and petrochemical complex elaborated in connection with the resolution of the Governmental Privatization Commission of November 6 1994 proposed the formation of a holding company Unipetrol in the way of merging Chemopetrol and Kaucuk with a new joint stock company Unipetrol established for this purpose by the National Property Fund. The updated proposal offers formation of the holding organization Unipetrol in a substantially simpler, from the point of view of time, organization and financing less demanding manner. This proposal is based on the following principles: respecting the approved privatization projects, the solution must not have influence on the rights and position of natural and juristic persons who became shareholders in accordance with the privatization projects already approved, the influence of the state on decisions of the holding and its daughter companies will be maintained with regard to the security of the state and supplying the strategically important subjects with fuels in situation of a crisis, the share of the business subjects in the shares of the holding will be such that it would enable them from the very beginning to participate effectively and not only formally in the decisions. 2 figs

  18. Fiscal 1999 feasibility study on energy conservation at Novo-oil refinery in Ufa City

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-31

    An energy conservation plan was examined for Novo oil refinery of Bashneftechim Company in Ufa City, Bashkortstan, Russia for the purpose of making the plan tied to the COP3 joint implementation. The objective units in the study include an atmospheric and vacuum distillation unit with throughput of 7.8 million tons/year, a visbreaker and a vacuum gas oil hydrodesulfurization unit (for feedstock of FCC in Lenin Refinery), and a catalytic cracking unit, for example. Energy conservation measures are improvement and revamping of heating furnace to control excess air ratio in furnace, installation of air pre-heater or heat recovery boiler to recover heat from exhaust gas of heating furnace, additional installation of heat exchangers to recover heat from product oils, and efficiency improvement of overall operation by modernization of instrumentation and controlling equipment. The policy is not complete rebuilding of the facilities but utilizing the existing facilities by improving energy efficiency as far as possible. The study shows that investment for energy saving will be recovered within 3-6 years in many cases while total investment is estimated to be 1.5-3.0 billion yen. Total reduction of fuel consumption will be 500-800 million yen. Yearly reduction of CO2 emission will amount to 0.29 million tons (23%). (NEDO)

  19. Cooperative AF Relaying in Spectrum-Sharing Systems: Outage Probability Analysis under Co-Channel Interferences and Relay Selection

    KAUST Repository

    Xia, Minghua

    2012-11-01

    For cooperative amplify-and-forward (AF) relaying in spectrum-sharing wireless systems, secondary users share spectrum resources originally licensed to primary users to communicate with each other and, thus, the transmit power of secondary transmitters is strictly limited by the tolerable interference powers at primary receivers. Furthermore, the received signals at a relay and at a secondary receiver are inevitably interfered by the signals from primary transmitters. These co-channel interferences (CCIs) from concurrent primary transmission can significantly degrade the performance of secondary transmission. This paper studies the effect of CCIs on outage probability of the secondary link in a spectrum-sharing environment. In particular, in order to compensate the performance loss due to CCIs, the transmit powers of a secondary transmitter and its relaying node are respectively optimized with respect to both the tolerable interference powers at the primary receivers and the CCIs from the primary transmitters. Moreover, when multiple relays are available, the technique of opportunistic relay selection is exploited to further improve system performance with low implementation complexity. By analyzing lower and upper bounds on the outage probability of the secondary system, this study reveals that it is the tolerable interference powers at primary receivers that dominate the system performance, rather than the CCIs from primary transmitters. System designers will benefit from this result in planning and designing next-generation broadband spectrum-sharing systems.

  20. Enterprise Integration of Management and Automation in a Refinery

    Science.gov (United States)

    Wang, Chengen

    Traditionally, problems in a petroleum refinery were separately modeled and solved with respect to disciplines. The segregated implementations of various disciplinary technologies resulted in considerable barriers impeding the pursuit of global optimal performance. It is recognized that enterprise-wide integration of the managerial and automation systems is of fundamental significance for refineries to promptly respond to global market requirements. In this paper, the technical implementations are disciplinarily categorized into managerial and automatic systems. Then, typical managerial and automatic implementations in a refinery are depicted to give an insight perception of the heterogeneous data sources manipulated by these systems. Finally, an integration approach based on data reconciliation techniques is proposed to link up the heterogeneous data sources.

  1. Fitting partially upgraded oils into pipelines and refinery markets

    International Nuclear Information System (INIS)

    Flaherty, G.

    2000-01-01

    The logistics of transporting partially upgraded crudes in feeder and trunk pipeline systems is discussed. Logistic alternatives are evaluated against economic drivers for partial upgrading, and the impact of crude transportation logistics on the quality of crude that reaches refinery gates is assessed. The potential advantages of partial upgrading in the field are reviewed (including reduction of diluent required to meet pipeline density and viscosity specifications, cost and availability of diluent, limitations in diluent transportation infrastructure, increased chemical stability, increased attractiveness to refineries, shortage of refinery coking capacity, higher market value). The pros and cons of various upgrading processes, and the implications of each for producers and refiners are explained. The advantages of moving to large common streams, as opposed to the concept of 'boutique' crudes, are stressed as the surest way for producers to realize the maximum value of partially upgraded crudes

  2. Outage performance analysis of underlay cognitive RF and FSO wireless channels

    KAUST Repository

    Ansari, Imran Shafique; Abdallah, Mohamed M.; Alouini, Mohamed-Slim; Qaraqe, Khalid A.

    2014-01-01

    In this work, the outage performance analysis of a dual-hop transmission system composed of asymmetric radio frequency (RF) channel cascaded with a free-space optical (FSO) link is presented. For the RF link, an underlay cognitive network

  3. A Unified Simulation Approach for the Fast Outage Capacity Evaluation over Generalized Fading Channels

    KAUST Repository

    Rached, Nadhir B.; Kammoun, Abla; Alouini, Mohamed-Slim; Tempone, Raul

    2016-01-01

    The outage capacity (OC) is among the most important performance metrics of communication systems over fading channels. The evaluation of the OC, when equal gain combining (EGC) or maximum ratio combining (MRC) diversity techniques are employed

  4. Assessment and control design for steam vent noise in an oil refinery.

    Science.gov (United States)

    Monazzam, Mohammad Reza; Golmohammadi, Rostam; Nourollahi, Maryam; Momen Bellah Fard, Samaneh

    2011-06-13

    Noise is one of the most important harmful agents in work environment. Noise pollution in oil refinery industries is related to workers' health. This study aimed to determine the overall noise pollution of an oil refinery operation and its frequency analysis to determine the control plan for a vent noise in these industries. This experimental study performed in control unit of Tehran Oil Refinery in 2008. To determine the noise distributions, environmental noise measurements were carried out by lattice method according to basic information and technical process. The sound pressure level and frequency distribution was measured for each study sources subject separately was performed individually. According to the vent's specification, the measured steam noise characteristics reviewed and compared to the theoretical results of steam noise estimation. Eventually, a double expansion muffler was designed. Data analysis and graphical design were carried out using Excel software. The results of environmental noise measurements indicated that the level of sound pressure was above the national permitted level (85 dB (A)). The Mean level of sound pressure of the studied steam jet was 90.3 dB (L). The results of noise frequency analysis for the steam vents showed that the dominant frequency was 4000 Hz. To obtain 17 dB noise reductions, a double chamber aluminum muffler with 500 mm length and 200 mm diameter consisting pipe drilled was designed. The characteristics of steam vent noise were separated from other sources, a double expansion muffler was designed using a new method based on the level of steam noise, and principle sound frequency, a double expansion muffler was designed.

  5. Control valves for critical applications in refineries; Stellventile bei kritischen Prozessbedingungen in Raffinerien

    Energy Technology Data Exchange (ETDEWEB)

    Kiesbauer, J. [Samson AG, Frankfurt am Main (Germany)

    2001-09-01

    In refineries, the process media flowing through valves are primarily liquids. With liquids, critical operating conditions caused by cavitation or flashing may occur. Symptoms are, for instance, increased noise emission, erosion of valve and pipe components or low-frequency mechanical vibration in the valve and the connected pipeline. Under these conditions, in particular, neglecting details can result in negative influences on the plant performance and the costs of ownership. Unfortunately, it is a common practice nowadays to select control valves in a ''quick and dirty'' fashion, because the phases of planning, bidding and order processing are connected with significant pressures of cost and time. This article presents the basic principles underlying the above problems and shows how to eliminate them based on practical examples from refineries. Moreover, a new throttling element is introduced, which is especially suited to the reduction of noise emission produced by cavitation. This new throttling element is implemented in refineries with increasing success. (orig.) [German] In Raffinerien werden Stellgeraete oft mit Fluessigkeiten durchstroemt. Dadurch koennen sich kritische Betriebszustaende als Folge von Kavitation oder Flashing ergeben. Dies aeussert sich z. B. in erhoehter Schallemission, in Erosion an Ventil- und Rohrleitungsbauteilen oder in niederfrequenten mechanischen Vibrationen im Ventil und der angeschlossenen Rohrleitung. Werden solche Einfluesse nicht von Anfang an richtig erfasst und ernst genommen, dann kann sich dies aeusserst negativ auf die Anlagen- und Prozesszuverlaessigkeit auswirken, verbunden mit deutlich erhoehten ''costs of ownership''. Leider ist es gerade heutzutage ueblich, Stellventile ''quick and dirty'' auszulegen, weil die Phasen der Planung, des Angebots und der Bestellung einem sehr starken Zeit- und Kostendruck unterliegen. Dieser Beitrag stellt die wesentlichen

  6. Failed fuel rod detection system and computerized manipulator during outages

    International Nuclear Information System (INIS)

    Boehm, H.H.; Foerch, H.

    1984-01-01

    During regular outages spent fuel assemblies need to be replaced and relocated within the core. Defective fuel rods in particular fuel assemblies have to be removed from further service and before delivery of such faulty fuel assemblies to a reprocessing plant. The system which Brown Boveri Reaktor GmbH and Krautkraemer have developed in the Federal Republic of Germany is capable of directly locating the defective rods in a proper fuel assembly. Inspection times are comparable to those of standard sipping methods, with the advantages of immediately available results and direct identification of the defective fuel rods. During the repair of fuel assemblies this system allows withdrawal of individual defective rods. With the sipping method all the fuel rods of a defective fuel assembly need to be removed and inspected by eddy current testing. During steam generator inspection and repair personnel are exposed to ample radiation. A remotely controlled, computerized manipulator was used to significantly reduce the radiation dose by automating steps in the procedures; at the same time inspection and repair times were reduced. The main features of the manipulator are a rigid component construction of the leg and two arms, and a resolver control for horizontal and vertical motion that enables rapid and accurate access to a desired tube (author)

  7. 40 CFR 80.1238 - How is a refinery's or importer's average benzene concentration determined?

    Science.gov (United States)

    2010-07-01

    ... concentration determined? (a) The average benzene concentration of gasoline produced at a refinery or imported... percent benzene). i = Individual batch of gasoline produced at the refinery or imported during the applicable averaging period. n = Total number of batches of gasoline produced at the refinery or imported...

  8. 40 CFR 80.596 - How is a refinery motor vehicle diesel fuel volume baseline calculated?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false How is a refinery motor vehicle diesel... Requirements § 80.596 How is a refinery motor vehicle diesel fuel volume baseline calculated? (a) For purposes of this subpart, a refinery's motor vehicle diesel fuel volume baseline is calculated using the...

  9. 77 FR 56421 - Standards of Performance for Petroleum Refineries; Standards of Performance for Petroleum...

    Science.gov (United States)

    2012-09-12

    ... Parts 9 and 60 Standards of Performance for Petroleum Refineries; Standards of Performance for Petroleum...-9672-3] RIN 2060-AN72 Standards of Performance for Petroleum Refineries; Standards of Performance for Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 2007...

  10. Verification and Enhancement of VIIRS Day-Night Band (DNB) Power Outage Detection Product

    Science.gov (United States)

    Burke, Angela; Schultz, Lori A.; Omitaomu, Olufemi; Molthan, Andrew L.; Cole, Tony; Griffin, Robert

    2017-01-01

    This case study of Hurricane Matthew (October 2016) uses the NASA Short-Term Prediction Research and Transition (SPoRT) Center DNB power outage product (using GSFC VIIRS DNB preliminary Black Marble product, Roman et al.. 2017) and 2013 LandScan Global population data to look for correlations between the post-event %-of-normal radiance and the utility company-reported outage numbers (obtained from EAGLE-1).

  11. Estimating the spatial distribution of power outages during hurricanes in the Gulf coast region

    International Nuclear Information System (INIS)

    Han, S.-R.; Guikema, Seth D.; Quiring, Steven M.; Lee, Kyung-Ho; Rosowsky, David; Davidson, Rachel A.

    2009-01-01

    Hurricanes have caused severe damage to the electric power system throughout the Gulf coast region of the US, and electric power is critical to post-hurricane disaster response as well as to long-term recovery for impacted areas. Managing power outage risk and preparing for post-storm recovery efforts requires accurate methods for estimating the number and location of power outages. This paper builds on past work on statistical power outage estimation models to develop, test, and demonstrate a statistical power outage risk estimation model for the Gulf Coast region of the US. Previous work used binary hurricane-indicator variables representing particular hurricanes in order to achieve a good fit to the past data. To use these models for predicting power outages during future hurricanes, one must implicitly assume that an approaching hurricane is similar to the average of the past hurricanes. The model developed in this paper replaces these indicator variables with physically measurable variables, enabling future predictions to be based on only well-understood characteristics of hurricanes. The models were developed using data about power outages during nine hurricanes in three states served by a large, investor-owned utility company in the Gulf Coast region

  12. Outage Analysis of Spectrum-Sharing over M-Block Fading with Sensing Information

    KAUST Repository

    Alabbasi, Abdulrahman

    2016-07-13

    Future wireless technologies, such as, 5G, are expected to support real-time applications with high data throughput, e.g., holographic meetings. From a bandwidth perspective, cognitive radio is a promising technology to enhance the system’s throughput via sharing the licensed spectrum. From a delay perspective, it is well known that increasing the number of decoding blocks will improve the system robustness against errors, while increasing the delay. Therefore, optimally allocating the resources to determine the tradeoff of tuning the length of decoding blocks while sharing the spectrum is a critical challenge for future wireless systems. In this work, we minimize the targeted outage probability over the block-fading channels while utilizing the spectrum-sharing concept. The secondary user’s outage region and the corresponding optimal power are derived, over twoblocks and M-blocks fading channels. We propose two suboptimal power strategies and derive the associated asymptotic lower and upper bounds on the outage probability with tractable expressions. These bounds allow us to derive the exact diversity order of the secondary user’s outage probability. To further enhance the system’s performance, we also investigate the impact of including the sensing information on the outage problem. The outage problem is then solved via proposing an alternating optimization algorithm, which utilizes the verified strict quasiconvex structure of the problem. Selected numerical results are presented to characterize the system’s behavior and show the improvements of several sharing concepts.

  13. Estimating the Propagation of Interdependent Cascading Outages with Multi-Type Branching Processes

    Energy Technology Data Exchange (ETDEWEB)

    Qi, Junjian; Ju, Wenyun; Sun, Kai

    2016-01-01

    In this paper, the multi-type branching process is applied to describe the statistics and interdependencies of line outages, the load shed, and isolated buses. The offspring mean matrix of the multi-type branching process is estimated by the Expectation Maximization (EM) algorithm and can quantify the extent of outage propagation. The joint distribution of two types of outages is estimated by the multi-type branching process via the Lagrange-Good inversion. The proposed model is tested with data generated by the AC OPA cascading simulations on the IEEE 118-bus system. The largest eigenvalues of the offspring mean matrix indicate that the system is closer to criticality when considering the interdependence of different types of outages. Compared with empirically estimating the joint distribution of the total outages, good estimate is obtained by using the multitype branching process with a much smaller number of cascades, thus greatly improving the efficiency. It is shown that the multitype branching process can effectively predict the distribution of the load shed and isolated buses and their conditional largest possible total outages even when there are no data of them.

  14. Verification and Enhancement of VIIRS Day-Night Band Power Outage Detection Product

    Science.gov (United States)

    Burke, A.; Schultz, L. A.; Omitaomu, O.; Molthan, A.; Cole, T.; Griffin, R.

    2017-12-01

    The NASA SPoRT (Short-term Prediction Research and Transition) Center has collaborated with scientists at NASA Goddard Space Flight Center to create a power outage detection product from radiance data obtained by the VIIRS (Visible Infrared Imaging Radiometer Suite) sensor aboard the Suomi-NPP satellite. This product uses a composite of pre-event radiance values from the VIIRS Day-Night Band to establish a baseline of "normal" nighttime lights for a study area. Then, after a severe weather event or other disaster, post-event images are compared to the composite to generate a percent-of-normal radiance product to identify areas that are experiencing outages and to aid in disaster response and monitor recovery. This project will use ground-truth county-level outage data provided by Oak Ridge National Laboratory (ORNL) in order validate the product and to establish a percent-of-normal threshold for identifying power outages. Once a threshold is found, ORNL's LandScan Global population data will be combined with the product to estimate how many electrical customers are being affected by power outages after a disaster. Two case studies will be explored to examine power outage recovery after severe weather events, including Hurricane Matthew from 2016 and the Washington D.C. Derecho event of 2012.

  15. Synergistic Use of Nighttime Satellite Data, Electric Utility Infrastructure, and Ambient Population to Improve Power Outage Detections in Urban Areas

    Directory of Open Access Journals (Sweden)

    Tony A. Cole

    2017-03-01

    Full Text Available Natural and anthropogenic hazards are frequently responsible for disaster events, leading to damaged physical infrastructure, which can result in loss of electrical power for affected locations. Remotely-sensed, nighttime satellite imagery from the Suomi National Polar-orbiting Partnership (Suomi-NPP Visible Infrared Imaging Radiometer Suite (VIIRS Day/Night Band (DNB can monitor power outages in disaster-affected areas through the identification of missing city lights. When combined with locally-relevant geospatial information, these observations can be used to estimate power outages, defined as geographic locations requiring manual intervention to restore power. In this study, we produced a power outage product based on Suomi-NPP VIIRS DNB observations to estimate power outages following Hurricane Sandy in 2012. This product, combined with known power outage data and ambient population estimates, was then used to predict power outages in a layered, feedforward neural network model. We believe this is the first attempt to synergistically combine such data sources to quantitatively estimate power outages. The VIIRS DNB power outage product was able to identify initial loss of light following Hurricane Sandy, as well as the gradual restoration of electrical power. The neural network model predicted power outages with reasonable spatial accuracy, achieving Pearson coefficients (r between 0.48 and 0.58 across all folds. Our results show promise for producing a continental United States (CONUS- or global-scale power outage monitoring network using satellite imagery and locally-relevant geospatial data.

  16. HERA an HTR for use in a refinery

    International Nuclear Information System (INIS)

    Chaubernard, P.

    1977-01-01

    It is shown that it was technically possible to use a High Temperature Reactor to provide a large part of the energy (process heat, steam, electricity) consumed in a refinery. Nevertheless, economic calculations have lead to a prime cost of spared crude oil twice the existing price

  17. Study theorizes use of geothermal sources for energy in refineries

    NARCIS (Netherlands)

    Golombok, M.; Beintema, K.

    2008-01-01

    Geothermal sources for direct heating can theoretically serve as an alternative source of high-temperature heat in processing plants. Cutting CO2 emissions from a refinery requires reducing the amount of fuel burned. Heat obtained from geothermal energy is more efficiently used for directly powering

  18. Occupational health experience with a contractor uranium refinery

    International Nuclear Information System (INIS)

    Heatherton, R.C.

    1975-01-01

    This paper presents information related to the occupational exposure of workers in uranium refinery operations at the Feed Materials Production Center since 1958. Included are: a brief history of the FMPC; a description of the operations and the principal sources of exposure; airborne uranium, urinary excretion, in vivo monitoring and tissue analysis data; and some observations regarding the exposure and health status of employees

  19. A strategic review of the petroleum refinery industry sector

    International Nuclear Information System (INIS)

    1999-10-01

    The report studies the environmental performance of the U.K. petroleum refinery industry sector with reference to world-wide best practice and describes the five most practical strategic options for emission reduction in the context of projected technology, cost, demand, capacity and legislation. (author)

  20. Treatment and disposal of refinery sludges: Indian scenario.

    Science.gov (United States)

    Bhattacharyya, J K; Shekdar, A V

    2003-06-01

    Crude oil is a major source of energy and feedstock for petrochemicals. Oily sludge, bio-sludge and chemical sludge are the major sludges generated from the processes and effluent treatment plants of the refineries engaged in crude oil refining operations. Refineries in India generate about 28,220 tons of sludge per annum. Various types of pollutants like phenols, heavy metals, etc. are present in the sludges and they are treated as hazardous waste. Oily sludge, which is generated in much higher amount compared to other sludges, contains phenol (90-100 mg/kg), nickel (17-25 mg/kg), chromium (27-80 mg/kg), zinc (7-80 mg/kg), manganese (19-24 mg/kg), cadmium (0.8-2 mg/kg), copper (32-120 mg/kg) and lead (0.001-0.12 mg/ kg). Uncontrolled disposal practices of sludges in India cause degradation of environmental and depreciation of aesthetic quality. Environmental impact due to improper sludge management has also been identified. Salient features of various treatment and disposal practices have been discussed. Findings of a case study undertaken by the authors for Numaligarh Refinery in India have been presented. Various system alternatives have been identified for waste management in Numaligarh Refinery. A ranking exercise has been carried out to evaluate the alternatives and select the appropriate one. A detailed design of the selected waste management system has been presented.

  1. Assessment of the effect of effluent discharge from coffee refineries ...

    African Journals Online (AJOL)

    The ecohydrological quality of water resource of Ethiopia is declining at an alarming rate, resulting in severe environmental degradation. This study finds out the effects of effluent discharge from intensive coffee refineries on river water quality based on physicochemical parameters and benthos assemblages as biological ...

  2. Environmental impact of illegal refineries on the vegetation of the ...

    African Journals Online (AJOL)

    ... aesthetic scenery of the forest, regeneration of plant species and destruction of wildlife habitat, disruption of water cycle and loss of medicinal plant species. Youth empowerment, through vocational training and environmental education can ameliorate the situation. Keywords: Environmental degradation, Illegal Refineries, ...

  3. Outage Probability Minimization for Energy Harvesting Cognitive Radio Sensor Networks

    Directory of Open Access Journals (Sweden)

    Fan Zhang

    2017-01-01

    Full Text Available The incorporation of cognitive radio (CR capability in wireless sensor networks yields a promising network paradigm known as CR sensor networks (CRSNs, which is able to provide spectrum efficient data communication. However, due to the high energy consumption results from spectrum sensing, as well as subsequent data transmission, the energy supply for the conventional sensor nodes powered by batteries is regarded as a severe bottleneck for sustainable operation. The energy harvesting technique, which gathers energy from the ambient environment, is regarded as a promising solution to perpetually power-up energy-limited devices with a continual source of energy. Therefore, applying the energy harvesting (EH technique in CRSNs is able to facilitate the self-sustainability of the energy-limited sensors. The primary concern of this study is to design sensing-transmission policies to minimize the long-term outage probability of EH-powered CR sensor nodes. We formulate this problem as an infinite-horizon discounted Markov decision process and propose an ϵ-optimal sensing-transmission (ST policy through using the value iteration algorithm. ϵ is the error bound between the ST policy and the optimal policy, which can be pre-defined according to the actual need. Moreover, for a special case that the signal-to-noise (SNR power ratio is sufficiently high, we present an efficient transmission (ET policy and prove that the ET policy achieves the same performance with the ST policy. Finally, extensive simulations are conducted to evaluate the performance of the proposed policies and the impaction of various network parameters.

  4. Nuclear refinery - advanced energy complex for electricity generation, clean fuel production, and heat supply

    International Nuclear Information System (INIS)

    McDonald, C.F.

    1992-01-01

    In planning for increased U.S. energy users' demand after the year 2000 there are essentially four salient vectors: (1) reduced reliance on imported crude oil; (2) provide a secure supply with stable economics; (3) supply system must be in concert with improved environment goals; and (4) maximum use to be made of indigenous resources. For the last decade of this century the aforementioned will likely be met by increasing utilization of natural gas. Early in the next century, however, in the U.S. and the newly industrializing nations, the ever increasing energy demand will only be met by the combined use of uranium and coal. The proposed nuclear refinery concept is an advanced energy complex that has at its focal point an advanced modular helium reactor (MHR). This nuclear facility, together with a coal feedstock, could contribute towards meeting the needs of the four major energy sectors in the U.S., namely electricity, transportation, industrial heating and chemical feedstock, and space and water heating. Such a nuclear/coal synergistic system would be in concert with improved air quality goals. This paper discusses the major features and multifaceted operation of a nuclear refinery concept, and identifies the enabling technologies needed for such an energy complex to become a reality early in the 21st century. (Author)

  5. Energy efficiency improvement and cost saving opportunities forpetroleum refineries

    Energy Technology Data Exchange (ETDEWEB)

    Worrell, Ernst; Galitsky, Christina

    2005-02-15

    The petroleum refining industry in the United States is the largest in the world, providing inputs to virtually any economic sector,including the transport sector and the chemical industry. The industry operates 146 refineries (as of January 2004) around the country,employing over 65,000 employees. The refining industry produces a mix of products with a total value exceeding $151 billion. Refineries spend typically 50 percent of cash operating costs (i.e., excluding capital costs and depreciation) on energy, making energy a major cost factor and also an important opportunity for cost reduction. Energy use is also a major source of emissions in the refinery industry making energy efficiency improvement an attractive opportunity to reduce emissions and operating costs. Voluntary government programs aim to assist industry to improve competitiveness through increased energy efficiency and reduced environmental impact. ENERGY STAR (R), a voluntary program managed by the U.S. Environmental Protection Agency, stresses the need for strong and strategic corporate energy management programs. ENERGY STAR provides energy management tools and strategies for successful corporate energy management programs. This Energy Guide describes research conducted to support ENERGY STAR and its work with the petroleum refining industry.This research provides information on potential energy efficiency opportunities for petroleum refineries. This Energy Guide introduces energy efficiency opportunities available for petroleum refineries. It begins with descriptions of the trends, structure, and production of the refining industry and the energy used in the refining and conversion processes. Specific energy savings for each energy efficiency measure based on case studies of plants and references to technical literature are provided. If available, typical payback periods are also listed. The Energy Guide draws upon the experiences with energy efficiency measures of petroleum refineries worldwide

  6. Market survey on products from the Tema Oil Refinery carried out as part of the feasibility study on the Tema Oil Refinery expansion project. Export trade information

    International Nuclear Information System (INIS)

    Anon.

    1991-10-01

    The Tema Oil Refinery (TOR), which was commissioned in 1963, is a simple hydroskimming plant which processes crude oil into LPG, gasoline, kerosene, gasoil, and fuel oil. It is the only petroleum refinery in Ghana. Over the years some of the equipment in the refinery has deteriorated or become obsolete necessitating major rehabilitation. A feasibility study is investigating the modernization and expansion of the refinery to meet projected market demands until the year 2005. The report presents the results of a market survey done on products from TOR

  7. Oil refinery dusts: morphological and size analysis by TEM.

    Science.gov (United States)

    Sielicki, Przemysław; Janik, Helena; Guzman, Agnieszka; Broniszewski, Mieczysław; Namieśnik, Jacek

    2011-03-01

    The objectives of this work were to develop a means of sampling atmospheric dusts on the premises of an oil refinery for electron microscopic study to carry out preliminary morphological analyses and to compare these dusts with those collected at sites beyond the refinery limits. Carbon and collodion membranes were used as a support for collection of dust particles straight on transmission electron microscopy (TEM) grids. Micrographs of the dust particles were taken at magnifications from ×4,000 to ×80,000 with a Tesla BS500 transmission electron microscope. Four parameters were defined on the basis of the micrographs: surface area, Feret diameter, circumference, and shape coefficient. The micrographs and literature data were used to classify the atmospheric dusts into six groups: particles with an irregular shape and rounded edges; particles with an irregular shape and sharp edges; soot and its aggregates; spherical particles; singly occurring, ultrafine dust particles; and particles not allocated to any of the previous five groups. The types of dusts found in all the samples were similar, although differences did exist between the various morphological parameters. Dust particles with the largest Feret diameter were present in sample 3 (mean, 0.739 μm)-these were collected near the refinery's effluent treatment plant. The particles with the smallest diameter were found in the sample that had been intended to be a reference sample for the remaining results (mean, 0.326 μm). The dust particles collected in the refinery had larger mean Feret diameters, even 100% larger, than those collected beyond it. Particles with diameters from 0.1 to 0.2 μm made up the most numerous group in all the samples collected in the refinery.

  8. Oil refinery dusts: morphological and size analysis by TEM

    Energy Technology Data Exchange (ETDEWEB)

    Sielicki, Przemyslaw; Janik, Helena; Guzman, Agnieszka [Gdansk University of Technology, Department of Polymer Technology, Chemical Faculty, Gdansk (Poland); Broniszewski, Mieczyslaw [Environmental Protection Office, Lotos Group, Gdansk (Poland); Namiesnik, Jacek [Gdansk University of Technology, Department of Analytical Chemistry, Chemical Faculty, Gdansk (Poland)

    2011-03-15

    The objectives of this work were to develop a means of sampling atmospheric dusts on the premises of an oil refinery for electron microscopic study to carry out preliminary morphological analyses and to compare these dusts with those collected at sites beyond the refinery limits. Carbon and collodion membranes were used as a support for collection of dust particles straight on transmission electron microscopy (TEM) grids. Micrographs of the dust particles were taken at magnifications from x 4,000 to x 80,000 with a Tesla BS500 transmission electron microscope. Four parameters were defined on the basis of the micrographs: surface area, Feret diameter, circumference, and shape coefficient. The micrographs and literature data were used to classify the atmospheric dusts into six groups: particles with an irregular shape and rounded edges; particles with an irregular shape and sharp edges; soot and its aggregates; spherical particles; singly occurring, ultrafine dust particles; and particles not allocated to any of the previous five groups. The types of dusts found in all the samples were similar, although differences did exist between the various morphological parameters. Dust particles with the largest Feret diameter were present in sample 3 (mean, 0.739 {mu}m) - these were collected near the refinery's effluent treatment plant. The particles with the smallest diameter were found in the sample that had been intended to be a reference sample for the remaining results (mean, 0.326 {mu}m). The dust particles collected in the refinery had larger mean Feret diameters, even 100% larger, than those collected beyond it. Particles with diameters from 0.1 to 0.2 {mu}m made up the most numerous group in all the samples collected in the refinery. (orig.)

  9. Overview of planning process at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The planning process at the Fast Flux Test Facility (FFTF) is controlled through a hierarchy of documents ranging from a ten-year strategic plan to a weekly schedule. Within the hierarchy are a Near-Term (three-year) Operating Plan, a Cycle (six-month) Plan, and an Outage/Operating Phase Schedule. Coordination of the planning process is accomplished by a dedicated preparation team that also provides an overview of the formal planning timetable which identifies key action items required to be completed before an outage/operating phase can begin

  10. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, E. [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science; Gauthereau, V. [Linkoeping Univ. (Sweden). Dept. of Industrial Engineering

    2001-06-01

    interviews were conducted with technical staff at most of the Swedish NPPs. It focused on which solutions the various NPPs had developed to cope with the problem, and which steps had been taken specifically to improve the efficiency of ORV. It was soon found that ORV could not be separated from the rest of the work done in a NPP during outages since many of the proposed solutions have a broad scope. An analysis of the nine Swedish ORV cases had found weaknesses in four main areas: administration processes, management, human performance, and control room layout. Relative to these, the Swedish NPPs have implemented several technical and organisational solutions. Among the former are an overall re-qualification scheme, blocked safety functions, computerised operational position control, and central indications in the control room. Most of the technical solutions have been part of the design of the newer plants, since to implement them in older plants requires essential changes both in the station and in the control room. The organisational solutions comprised operational readiness plans, systematic ways of working, new instructions, co-ordinated testing, and the use of redundant or independent controls. Special emphasis was put on how the NPPs planned their outages, how the plans were implemented, and how deviations were handled. Issues related to learning from experience were also investigated. It was found that although all the NPPs approached the ORV issues in a serious and efficient manner, the solutions could be different corresponding to the characteristics of the organisation. Finally a number of questions, which still need answers, were identified. One is how new procedures or new barriers are accepted and assimilated into the safety culture. A second concerns the demarcation of systems for which ORV is required, i.e., the boundary between safety and non-safety systems. A third is how complex technical solutions influence the operators' work. Finally, it is

  11. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    International Nuclear Information System (INIS)

    Hollnagel, E.; Gauthereau, V.

    2001-06-01

    interviews were conducted with technical staff at most of the Swedish NPPs. It focused on which solutions the various NPPs had developed to cope with the problem, and which steps had been taken specifically to improve the efficiency of ORV. It was soon found that ORV could not be separated from the rest of the work done in a NPP during outages since many of the proposed solutions have a broad scope. An analysis of the nine Swedish ORV cases had found weaknesses in four main areas: administration processes, management, human performance, and control room layout. Relative to these, the Swedish NPPs have implemented several technical and organisational solutions. Among the former are an overall re-qualification scheme, blocked safety functions, computerised operational position control, and central indications in the control room. Most of the technical solutions have been part of the design of the newer plants, since to implement them in older plants requires essential changes both in the station and in the control room. The organisational solutions comprised operational readiness plans, systematic ways of working, new instructions, co-ordinated testing, and the use of redundant or independent controls. Special emphasis was put on how the NPPs planned their outages, how the plans were implemented, and how deviations were handled. Issues related to learning from experience were also investigated. It was found that although all the NPPs approached the ORV issues in a serious and efficient manner, the solutions could be different corresponding to the characteristics of the organisation. Finally a number of questions, which still need answers, were identified. One is how new procedures or new barriers are accepted and assimilated into the safety culture. A second concerns the demarcation of systems for which ORV is required, i.e., the boundary between safety and non-safety systems. A third is how complex technical solutions influence the operators' work. Finally, it is proposed to

  12. Operational readiness verification, phase 1: A study on safety during outage and restart of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Hollnagel, E [Linkoeping Univ. (Sweden). Dept. of Computer and Information Science; Gauthereau, V [Linkoeping Univ. (Sweden). Dept. of Industrial Engineering

    2001-06-01

    interviews were conducted with technical staff at most of the Swedish NPPs. It focused on which solutions the various NPPs had developed to cope with the problem, and which steps had been taken specifically to improve the efficiency of ORV. It was soon found that ORV could not be separated from the rest of the work done in a NPP during outages since many of the proposed solutions have a broad scope. An analysis of the nine Swedish ORV cases had found weaknesses in four main areas: administration processes, management, human performance, and control room layout. Relative to these, the Swedish NPPs have implemented several technical and organisational solutions. Among the former are an overall re-qualification scheme, blocked safety functions, computerised operational position control, and central indications in the control room. Most of the technical solutions have been part of the design of the newer plants, since to implement them in older plants requires essential changes both in the station and in the control room. The organisational solutions comprised operational readiness plans, systematic ways of working, new instructions, co-ordinated testing, and the use of redundant or independent controls. Special emphasis was put on how the NPPs planned their outages, how the plans were implemented, and how deviations were handled. Issues related to learning from experience were also investigated. It was found that although all the NPPs approached the ORV issues in a serious and efficient manner, the solutions could be different corresponding to the characteristics of the organisation. Finally a number of questions, which still need answers, were identified. One is how new procedures or new barriers are accepted and assimilated into the safety culture. A second concerns the demarcation of systems for which ORV is required, i.e., the boundary between safety and non-safety systems. A third is how complex technical solutions influence the operators' work. Finally, it is proposed to

  13. Oil refining in a CO2 constrained world: Effects of carbon pricing on refineries globally

    International Nuclear Information System (INIS)

    Abdul-Manan, Amir F.N.; Arfaj, Abdullah; Babiker, Hassan

    2017-01-01

    Six aggregated refinery linear programming (LP) models were developed to represent actual refineries in North America, Latin America, Europe (including the CIS), Middle East, Asia (excluding China) and China. The models were used to conduct regional comparative assessments and to evaluate the effects of carbon pricing on refinery operations globally. We found that the average refinery energy efficiencies for the regions were estimated to range from 92.2% to 95.2%. The well-to-refinery gate carbon intensities for gasoline, diesel and jet fuels were estimated to be 17.1 (16.4–19.4), 13.3 (12.5–14.2) and 10.1 (9.6–10.8) gCO2eq/MJ, respectively. If refineries are forced to at least meet the 2014 regional volume demands for oil products, pricing CO 2 would not have an impact on either refinery productions, efficiency or emissions. If refineries are allowed to re-optimize production slates to reduce CO 2 emissions, refineries would opt to increase gasoline yield at the expense of diesel. This is counter intuitive since gasoline has a higher carbon intensity than diesel. The refinery bias against dieselization creates a supply preference toward a less efficient transportation end use. Here, we argue that if carbon pricing is not administered properly, this can lead to emissions leakage from refineries to the road transport sector. - Highlights: • Investigate actual refinery productions in 6 regions globally. • Refineries already operate at the most efficient levels. • Complex refineries tolerate higher CO 2 prices better. • Carbon pricing induces bias against dieselization. • Identify potential emissions leakage.

  14. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  15. Distributed power-line outage detection based on wide area measurement system.

    Science.gov (United States)

    Zhao, Liang; Song, Wen-Zhan

    2014-07-21

    In modern power grids, the fast and reliable detection of power-line outages is an important functionality, which prevents cascading failures and facilitates an accurate state estimation to monitor the real-time conditions of the grids. However, most of the existing approaches for outage detection suffer from two drawbacks, namely: (i) high computational complexity; and (ii) relying on a centralized means of implementation. The high computational complexity limits the practical usage of outage detection only for the case of single-line or double-line outages. Meanwhile, the centralized means of implementation raises security and privacy issues. Considering these drawbacks, the present paper proposes a distributed framework, which carries out in-network information processing and only shares estimates on boundaries with the neighboring control areas. This novel framework relies on a convex-relaxed formulation of the line outage detection problem and leverages the alternating direction method of multipliers (ADMM) for its distributed solution. The proposed framework invokes a low computational complexity, requiring only linear and simple matrix-vector operations. We also extend this framework to incorporate the sparse property of the measurement matrix and employ the LSQRalgorithm to enable a warm start, which further accelerates the algorithm. Analysis and simulation tests validate the correctness and effectiveness of the proposed approaches.

  16. International outage coding system for nuclear power plants. Results of a co-ordinated research project

    International Nuclear Information System (INIS)

    2004-05-01

    The experience obtained in each individual plant constitutes the most relevant source of information for improving its performance. However, experience of the level of the utility, country and worldwide is also extremely valuable, because there are limitations to what can be learned from in-house experience. But learning from the experience of others is admittedly difficult, if the information is not harmonized. Therefore, such systems should be standardized and applicable to all types of reactors satisfying the needs of the broad set of nuclear power plant operators worldwide and allowing experience to be shared internationally. To cope with the considerable amount of information gathered from nuclear power plants worldwide, it is necessary to codify the information facilitating the identification of causes of outages, systems or component failures. Therefore, the IAEA established a sponsored Co-ordinated Research Project (CRP) on the International Outage Coding System to develop a general, internationally applicable system of coding nuclear power plant outages, providing worldwide nuclear utilities with a standardized tool for reporting outage information. This TECDOC summarizes the results of this CRP and provides information for transformation of the historical outage data into the new coding system, taking into consideration the existing systems for coding nuclear power plant events (WANO, IAEA-IRS and IAEA PRIS) but avoiding duplication of efforts to the maximum possible extent

  17. Balance-of-plant outage availability study. Phase I. Extension report. [PWR

    Energy Technology Data Exchange (ETDEWEB)

    Thomasson, F.R.

    1978-09-01

    After completion of the Phase 1 Refueling Outage Availability Study, Babcock and Wilcox and the U.S. Department of Energy entered into a supplemental agreement to perform a balance-of-plant maintenance, inspection, and test study with the cooperation of Duke Power Company and Arkansas Power and Light Company. The objectives were (1) to expand the Phase 1 data base, including balance-of-plant activities, to reduce outage time and increase plant availability and (2) to conduct an onsite review of plant maintenance, practices to complement the utility efforts in reducing outage time and increasing on-line operational time. Data were obtained from (1) observations during the 1977 refueling outage at Oconee 3, (2) review of maintenance practices during the Arkansas Nuclear One, Unit 1, operational cycle in 1977, and (3) selected observations of the 1978 refueling outage at ANO-1. Accumulated data were then reviewed and analyzed to produce a list of improvement recommendations for Oconee 3 and ANO-1 that can be generically applied to plants of similar design and construction.

  18. Balance-of-plant outage availability study. Phase I. Extension report

    International Nuclear Information System (INIS)

    Thomasson, F.R.

    1978-09-01

    After completion of the Phase 1 Refueling Outage Availability Study, Babcock and Wilcox and the U.S. Department of Energy entered into a supplemental agreement to perform a balance-of-plant maintenance, inspection, and test study with the cooperation of Duke Power Company and Arkansas Power and Light Company. The objectives were (1) to expand the Phase 1 data base, including balance-of-plant activities, to reduce outage time and increase plant availability and (2) to conduct an onsite review of plant maintenance, practices to complement the utility efforts in reducing outage time and increasing on-line operational time. Data were obtained from (1) observations during the 1977 refueling outage at Oconee 3, (2) review of maintenance practices during the Arkansas Nuclear One, Unit 1, operational cycle in 1977, and (3) selected observations of the 1978 refueling outage at ANO-1. Accumulated data were then reviewed and analyzed to produce a list of improvement recommendations for Oconee 3 and ANO-1 that can be generically applied to plants of similar design and construction

  19. Outage Performance of Decode-and-Forward in Two-Way Relaying with Outdated CSI

    KAUST Repository

    Hyadi, Amal

    2015-01-07

    In this paper, we analyze the outage behavior of decode-and-forward relaying in the context of selective two-way cooperative systems. First, a new relay selection metric is proposed to take into consideration both transmission rates and instantaneous link conditions between cooperating nodes. Afterwards, the outage probability of the proposed system is derived for Nakagami-m fading channels in the case when perfect channel state information is available and then extended to the more realistic scenario where the available channel state information (CSI) is outdated due to fast fading. New expressions for the outage probability are obtained, and the impact of imperfect CSI on the performance is evaluated. Illustrative numerical results, Monte Carlo simulations, and comparisons with similar approaches are presented to assess the accuracy of our analytical derivations and confirm the performance gain of the proposed scheme.

  20. Thermal Hydraulic Assessment for Loss of SDCS Event During the Outage of CANDU Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jonghyun [Gnest, Inc. Taejon (Korea, Republic of); Lee, Kwangho; Oh, Haechol; Jun, Hwangyong [KEPRI, Taejon (Korea, Republic of)

    2006-07-01

    During the outage(overhaul) of the nuclear power plant, there are several operating states other than the full power state, that is 'Hot-Zero Power', 'Depressurized-Cooldown', and 'Partially Drained'. Until now safety assessment has not been done much for this operating state of CANDU type reactor worldwide. For the accuracy and confidence of PSA for the CANDU outage, the safety analysis is necessary. At the first stage, we analyzed the thermal hydraulic characteristics and safety of the postulated event of loss of shutdown cooling system (SDCS) during the partially drained state which is the longest one in the middle of outage period. As an analysis tool, this study uses the best estimate thermal hydraulic code, RELAP5/CANDU which was modified according to the CANDU specific characteristics and based on RELAP5.Mod3.

  1. Outage Performance of Flexible OFDM Schemes in Packet-Switched Transmissions

    Directory of Open Access Journals (Sweden)

    Romain Couillet

    2009-01-01

    Full Text Available α-OFDM, a generalization of the OFDM modulation, is proposed. This new modulation enhances the outage capacity performance of bursty communications. The α-OFDM scheme is easily implementable as it only requires an additional time symbol rotation after the IDFT stage and a subsequent phase rotation of the cyclic prefix. The physical effect of the induced rotation is to slide the DFT window over the frequency spectrum. When successively used with different angles α at the symbol rate, α-OFDM provides frequency diversity in block fading channels. Interestingly, simulation results show a substantial gain in terms of outage capacity and outage BER in comparison with classical OFDM modulation schemes. The framework is extended to multiantenna and multicellular OFDM-based standards. Practical simulations, in the context of 3GPP-LTE, called hereafter α-LTE, sustain our theoretical claims.

  2. Outage performance of reactive cooperation in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha

    2010-06-01

    In this paper, we investigate the outage performance of Decode-and-Forward with reactive relaying in dual-hop cooperetive Nakagaml-m fading links. The destination, based on the umque knowledge of local second hop channel state information, selects the best relay to increase the chances of cooperation when the direct link is also available. After deriving the exact distribution of the variables of interest, the outage probability of the system - with and without the direct link - is obtained in closed-form, and the ε-outage capacity is derived in the particular c.se wh.ere the channel model is reduced to a Rayleigh fading. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters.

  3. Outage performance of Decode-and-Forward partial selection in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha

    2010-01-01

    In this paper, we investigate the outage performance of Decode-and-Forward with partial selection relaying in dualhop cooperative Nakagami-m fading links. The source, based on the unique knowledge of local first hop channel state information, selects the best relay to increase the chances of successful decoding and hence the possibility of cooperation when the direct link is also available. After deriving the exact distribution of the sum of two gamma variates with the same shape parameter, the outage probability of the system-with and without the direct link-is obtained in closed-form. We also derive the ε-outage capacity in different particular cases, and the obtained results- when the channel model is reduced to a Rayleigh fading-are either new or correspond to those previously obtained in other works. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters. © 2009 IEEE.

  4. Control Room Tasks During Refueling in Ringhals 1 Nuclear Power Plant - Operator performance during refuelling outages

    International Nuclear Information System (INIS)

    Stroebeck, Einar; Olausson, Jesper; Van Gemst, Paul

    1998-01-01

    This paper discusses the performance and tasks of the operators in the control room during refuelling outages. Analyses of such events have, during the last years, shown that the risk for nuclear accidents is not negligible compared with the risk at higher reactor power levels. Some experts have the opinion that, due to mistakes during an outage, the risk for such accidents during the outage and other accidents later on during power operation is higher than in other plant situations. The high risk level is mainly a result of errors at maintenance actions and supervision of lining up of safety systems. Most of the control rooms in existing NPPs were designed more than 10 years ago. At that time the activities and the tasks for the operators were not very well understood. Procedures for refuelling and other activities during the outages were not described very well. Often the utility organisation for refuelling outages was not established at the start of the control room design. Experience from operation during many years has shown that the performance of operators can be improved in existing plant, and thus risks be reduced, by upgrading the control room. These issues have been studied as a part of the modernisation project for Ringhals 1, an ABB Atom BWR owned by Vattenfall AB in Sweden. The paper will describe the working model for upgrading the control room and important issues to take care of with respect to refuelling outages. The identified issues will be used as the input for improving control room philosophy and the individual technical systems. (authors)

  5. Radioisotope techniques for problem-solving on refineries

    International Nuclear Information System (INIS)

    Charlton, J.S.; Webb, M.

    1994-01-01

    Increasingly, refineries worldwide are recognizing the value of radioisotope technology in studying the operation of on-line plant. Using case studies, this paper illustrates the versatility of radioisotope techniques in a wide range of investigations: the density-profiling of distillation columns; the investigation of leaks on feed/effluent exchangers; on-line flowrate measurement; underground leakage detection. The economic benefits deriving from radioisotope applications are indicated

  6. Legitimacy in Green: Pollution vs. Profit in Canadian Oil Refineries

    Directory of Open Access Journals (Sweden)

    Vanessa Magness

    2007-06-01

    light of changing societal expectations have created an external environment that encourages the development of new technologies that promote cost efficiencies and good environmental performance simultaneously.  Russo and Fouts (1997 argued that industries subject to rapid technological advance are well suited to respond to these changes in the external environment. The findings of this paper suggest that the petroleum refinery sector of the oil and gas industry may be meeting the challenge of the environmental movement.

  7. SPARO - A system for process analysis of refinery operations

    Energy Technology Data Exchange (ETDEWEB)

    Kesler, M.G.; Graham, J.; Weissbrod, J.

    1987-01-01

    SPARO is a customized process simulator for the PC, designed to review as well as to guide operations of hydrocarbon processing units. It can be applied to: gas plants or refinery gas recovery units; crude/vacuum towers with associated heat exchange; light ends units, such as reforming, alkylation and isomerization; fractionation and heat exchange units of Ethylene plants; aromatics and styrene units, and others. The main uses of SPARO are discussed in this paper.

  8. POSSIBILITIES OF CARBON DIOXIDE FIXATION BY MICROALGAE IN REFINERY

    OpenAIRE

    Šingliar, Michal; Mikulec, Jozef; Kušnir, Patrik; Polakovičova, Gabriela

    2013-01-01

    Capture and sequestration of carbon dioxide is one of the most critical challenges today for businesses and governments worldwide. Thousands of emitting power plants and industries worldwide face this costly challenge – reduce the CO2 emissions or pay penalties. One possibility for carbon dioxide sequestration is its fixation in microalgae. Microalgae can sequester CO2 from flue gases emitted from fossil fuel-fired refinery plants and units, thereby reducing emissions of a major greenhouse ga...

  9. A Novel Transporting System Model for Oil Refinery

    OpenAIRE

    Razman M. Tahar; Waleed K. Abduljabbar

    2010-01-01

    Problem statement: Oil refineries are widely used to store various liquids and gases. Petroleum products are in high demand. Oil companies have abundant resources of petroleum products in pipelines and storage tanks. Approach: Included are storage tanks at retail gasoline station, home heating oil tanks, lubricant storage at automotive service facilities, propane tanks in all sorts of application, and oil company terminals across the world. The aim of this study is to present a model by which...

  10. Global Warming Potential Of A Waste Refinery Using Enzymatic Treatment

    DEFF Research Database (Denmark)

    Tonini, Davide; Astrup, Thomas

    2010-01-01

    and fossil resources. This is especially important with respect to the residual waste (i.e. the remains after source-separation and separate collection) which is typically incinerated or landfilled. In this paper the energy and Global Warming performance of a pilot-scale waste refinery for the enzymatic...... plants and utilization of the liquid fraction for biogas production turned out to be the best options with respect to energy and Global Warming performance....

  11. US refineries lament lack of final CAA rules

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Bush administration spokesman appeared unconvinced about the extent of the U.S. refining industry's problems at a Senate energy committee hearing. This paper reports that the oversight hearing examined various challenges facing refiners. Roger Beach, president of Unocal Refining and Marketing Division, testified for the National Petroleum Refiners Association, of which he is chairman. Beach the refineries still do not know what final Clean Air Act (CAA) amendments regulations will be, and state rules are changing, too

  12. Quality planning for major plant design modifications

    International Nuclear Information System (INIS)

    Dulee, R.J.

    1988-01-01

    This paper reviews the approach and activities undertaken by Public Service Electric and Gas Company's (PSE and G's) nuclear quality assurance (QA) department to support major plant design modifications conducted during refueling outages at Salem Generating Station. It includes the planning and implementation of quality plans developed to provide both QA and quality control (QC) coverage of modification performed by contracted service organizations

  13. Integrated head area design of KNGR to reduce refueling outage duration

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo Tae; Park, Chi Yong; Kim, In Hwan; Kim, Dae Woong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    In the design of KNGR (Korea Next Generation Reactor), we believe that economy is one of the most important factors to be considered. Thus, we reviewed and evaluated the consequences of designing the head area into an integrated package from an economical point of view. The refueling outage durations of the nuclear power plants currently in operation in Korea, some having and others not having integrated head package, are compared. This paper discusses the characteristics of head area design and the critical design issues of KNGR head area to evaluate the effect of the head area characteristics on the outage duration. 8 refs., 4 figs. (Author)

  14. Integrated head area design of KNGR to reduce refueling outage duration

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Woo Tae; Park, Chi Yong; Kim, In Hwan; Kim, Dae Woong [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1998-12-31

    In the design of KNGR (Korea Next Generation Reactor), we believe that economy is one of the most important factors to be considered. Thus, we reviewed and evaluated the consequences of designing the head area into an integrated package from an economical point of view. The refueling outage durations of the nuclear power plants currently in operation in Korea, some having and others not having integrated head package, are compared. This paper discusses the characteristics of head area design and the critical design issues of KNGR head area to evaluate the effect of the head area characteristics on the outage duration. 8 refs., 4 figs. (Author)

  15. Power Allocation and Outage Probability Analysis for SDN-based Radio Access Networks

    Science.gov (United States)

    Zhao, Yongxu; Chen, Yueyun; Mai, Zhiyuan

    2018-01-01

    In this paper, performance of Access network Architecture based SDN (Software Defined Network) is analyzed with respect to the power allocation issue. A power allocation scheme PSO-PA (Particle Swarm Optimization-power allocation) algorithm is proposed, the proposed scheme is subjected to constant total power with the objective of minimizing system outage probability. The entire access network resource configuration is controlled by the SDN controller, then it sends the optimized power distribution factor to the base station source node (SN) and the relay node (RN). Simulation results show that the proposed scheme reduces the system outage probability at a low complexity.

  16. Outage probability analysis of wireless sensor networks in the presence of channel fading and spatial correlation

    KAUST Repository

    Al-Murad, Tamim M.

    2011-07-01

    Evaluating the reliability of wireless sensor networks is becoming more important as theses networks are being used in crucial applications. The outage probability defined as the probability that the error in the system exceeds a maximum acceptable threshold has recently been used as a measure of the reliability of such systems. In this work we find the outage probability of wireless sensor network in different scenarios of distributed sensing where sensors\\' readings are affected by spatial correlation and in the presence of channel fading. © 2011 IEEE.

  17. Replacement power costs due to nuclear-plant outages: a higher standard of care

    International Nuclear Information System (INIS)

    Gransee, M.F.

    1982-01-01

    This article examines recent state public utility commission cases that deal with the high costs of replacement power that utilities must purchase after a nuclear power plant outage. Although most commissions have approved such expenses, it may be that there is a trend toward splitting the costs of such expenses between ratepayer and stockholder. Commissions are demanding a management prudence test to determine the cause of the outage and whether it meets the reasonable man standard before allowing these costs to be passed along to ratepayers. Unless the standard is applied with flexibility, however, utility companies could invoke the defenses covering traditional common law negligence

  18. Advanced purification of petroleum refinery wastewater by catalytic vacuum distillation.

    Science.gov (United States)

    Yan, Long; Ma, Hongzhu; Wang, Bo; Mao, Wei; Chen, Yashao

    2010-06-15

    In our work, a new process, catalytic vacuum distillation (CVD) was utilized for purification of petroleum refinery wastewater that was characteristic of high chemical oxygen demand (COD) and salinity. Moreover, various common promoters, like FeCl(3), kaolin, H(2)SO(4) and NaOH were investigated to improve the purification efficiency of CVD. Here, the purification efficiency was estimated by COD testing, electrolytic conductivity, UV-vis spectrum, gas chromatography-mass spectrometry (GC-MS) and pH value. The results showed that NaOH promoted CVD displayed higher efficiency in purification of refinery wastewater than other systems, where the pellucid effluents with low salinity and high COD removal efficiency (99%) were obtained after treatment, and the corresponding pH values of effluents varied from 7 to 9. Furthermore, environment estimation was also tested and the results showed that the effluent had no influence on plant growth. Thus, based on satisfied removal efficiency of COD and salinity achieved simultaneously, NaOH promoted CVD process is an effective approach to purify petroleum refinery wastewater. Copyright 2010 Elsevier B.V. All rights reserved.

  19. Economics and the refinery's CO2 emissions allocation problem

    International Nuclear Information System (INIS)

    Pierru, A.

    2007-01-01

    The establishment of a market for CO 2 emission rights in Europe leads oil-refining companies to add a cost associated with carbon emissions to the objective function of linear programming models used to manage refineries. These models may be used to compute the marginal contribution of each finished product to the CO 2 emissions of the refinery. Babusiaux (Oil. Gas Sci. Technol., 58, 2003, 685-692) has shown that, under some conditions, this marginal contribution is a relevant means of allocating the carbon emissions of the refinery. Thus, it can be used in a well-to-wheel Life Cycle Assessment. In fact, this result holds if the demand equations are the only binding constraints with a non-zero right-hand side coefficient. This is not the case for short-run models with fixed capacity. Then, allocating CO 2 emissions on a marginal basis tends to over-value (or undervalue) the total volume of emissions. In order to extend the existing methodology, we discuss two distinct solutions to this problem, inspired by economic theory: adapting either the Aumann-Shapley cost sharing method (Values of non-atomic games, 1974, Princeton University Press) or the Ramsey pricing formula (Econ. J., 37, 1927, 47-61; J. Econ. Theory, 3, 1971, 219-240). We compare these two solutions, with a strong argument in favour of Ramsey prices, based on the determination of the optimal environmental tax rate to which imported finished products should be subject. (author)

  20. Analysis and control of odors from petroleum refineries

    International Nuclear Information System (INIS)

    O'Brien, M.A.; Duffee, R.A.; Ostojic, N.

    1992-01-01

    This paper presents a proven approach used to effectively solve odor problems associated with atmospheric emissions from petroleum refineries. A systematic evaluation is first conducted to identify all emissions with the potential for off-site odor impacts. Sampling is then conducted and dynamic dilution olfactometry is used to quantify the odor emission rates of each source. Community odor surveys are performed simultaneously with the source sampling to quantitatively document the downwind odor impacts. Atmospheric dispersion modeling specifically designed for odor is then used to predict instantaneous odor occurrences at various receptor sites under meteorological conditions not actually encountered during the field study. The findings make it possible to rank sources by their odor emission rates and potential for odor impacts in the community. It is then possible to determine how much odor reduction is required to bring the present odor impacts of the individual sources to an acceptable level under worst-case meteorological conditions. Once the degree of control required is determined, control alternatives are selected and evaluated. Case histories have been selected to illustrate the application of this approach at petroleum refineries. They provide descriptions of odor assessment and abatement studies conducted specifically for refinery effluent treatment plant sources as well as process unit emission sources. The sources identified as needing control and the odor abatement measures taken are discussed

  1. Continues treatment of oily sludge at Colombian refineries

    International Nuclear Information System (INIS)

    Echeverria, Victor; Monsalve, Gladys; Vidales, Humberto

    2002-01-01

    The Colombian Petroleum institute - ICP, the research and development branch of Ecopetrol has developed a unique technological package used to treat oily sludge in a continuous way. The sludge comes from a refinery with 220000 barrels of crude per day load, located in the Middle Madgalena River Valley in Colombia. The technological package allows for a) the recovery of the hydrocarbon contained in oily wastes (up to 50%) b) the elimination of the oil contained in solid using a biodegradation process and, c) the availability economically and technically feasible solution to handle oily sludge generated in the refinery. The oily treated in this process come from maintenance of refinery's equipment and also from the physical chemical separation process at the industrial wastewater treatment plant. Oily sludge is a complex system where light and heavy oils, contaminated water and contaminated solids coexist in the form of direct, inverse and multiple emulsions. The comprehensive technological package allows the treatment of oily sludge in a cost effective way. ICP technological package developed includes technologies combining mechanical, thermal, chemical and electrostatic dehydration techniques and stimulated and intensive bioremediation to decontamination of solids saturated with residual oil. This technological package brings a solution to old environmental problem caused by the inappropriate final disposal of oily wastes such as storage in ponds, marshes and open pits: Nowadays wastes generated are treated in a continuous process that is environmentally friendly and economically profitable

  2. University of Maine Integrated Forest Product Refinery (IFPR) Technology Research

    Energy Technology Data Exchange (ETDEWEB)

    Pendse, Hemant P.

    2010-11-23

    This project supported research on science and technology that forms a basis for integrated forest product refinery for co-production of chemicals, fuels and materials using existing forest products industry infrastructure. Clear systems view of an Integrated Forest Product Refinery (IFPR) allowed development of a compelling business case for a small scale technology demonstration in Old Town ME for co-production of biofuels using cellulosic sugars along with pulp for the new owners of the facility resulting in an active project on Integrated Bio-Refinery (IBR) at the Old Town Fuel & Fiber. Work on production of advanced materials from woody biomass has led to active projects in bioplastics and carbon nanofibers. A lease for 40,000 sq. ft. high-bay space has been obtained to establish a Technology Research Center for IFPR technology validation on industrially relevant scale. UMaine forest bioproducts research initiative that began in April 2006 has led to establishment of a formal research institute beginning in March 2010.

  3. Treatment of Refinery Waste Water Using Environmental Friendly Adsorbent

    Science.gov (United States)

    Devi, M. Geetha; Al-Moshrafi, Samira Mohammed Khamis; Al Hudaifi, Alaa; Al Aisari, Buthaina Hamood

    2017-12-01

    This research evaluates the effectiveness of activated carbon prepared from walnut shell in the removal of pollutants from refinery waste water by adsorption technique. A series of batch experiments were carried out by varying the effluent solution pH, stirring time, stirring speed and adsorbent dosage in the reduction of pollutants from refinery effluent. Characterization of the adsorbent was performed using Scanning Electron Microscopy (SEM), Brunauer Emmett and Teller (BET) isotherm and Fourier Transform Infrared (FTIR) Spectroscopy. The best quality activated carbon was obtained with a particle size of 0.75 µm, activation temperature of 800 °C and activation time 24 h. The maximum BET surface area obtained was 165.2653 m2/g. The experimental results demonstrates that the highest percentage reduction in COD was 79%, using 0.6 g walnut shell powder at an optimum stirring speed of 100 rpm, at pH 6 and 120 min of contact time. The outcome of the result shows that walnut shell carbon is a potentially useful adsorbent for the removal of pollutants from refinery waste water.

  4. Assessment of accidental refinery wastewater discharge: a case study

    Energy Technology Data Exchange (ETDEWEB)

    Bandyopadhyay, Amitava [University of Calcutta, Department of Chemical Engineering, Kolkata (India)

    2011-04-15

    The physicochemical qualities of an accidental discharge of refinery liquid waste, water, and soil sediment of that effluent-receiving water body (canal) were investigated. Analyses of the discharge, qualities of water, and sediment of the canal showed high parametric concentrations. Investigations revealed that the discharge took place form the spent caustic that was generated from the caustic wash tower of Fluidized Catalytic Cracker of the refinery. A simple but realistic model was suggested for the remediation of sediments of the canal with an estimated cost of about US $1.86 million. Recommendations were made to prevent such discharges and to revise thoroughly the Indian effluent discharge standards in force for petroleum oil refinery. Subsequently, revised standards were notified under Indian guidelines. Interestingly, cyanide besides many other parameters was introduced into these standards. Furthermore, Volatile Organic Compound (VOC) was also stipulated as an emission parameter from the waste water treatment plants. Concentration- and mass-based standards thus promulgated were stricter than the existing standards. (orig.)

  5. 10 CFR 501.191 - Use of natural gas or petroleum for certain unanticipated equipment outages and emergencies...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Use of natural gas or petroleum for certain unanticipated... Natural Gas or Petroleum for Emergency and Unanticipated Equipment Outage Purposes § 501.191 Use of natural gas or petroleum for certain unanticipated equipment outages and emergencies defined in section...

  6. An estimation of cogeneration potential by using refinery residuals in Mexico

    International Nuclear Information System (INIS)

    Marin-Sanchez, J.E.; Rodriguez-Toral, M.A.

    2007-01-01

    Electric power generation in Mexico is mainly based on fossil fuels, specifically heavy fuel oil, although the use of natural gas combined cycles (NGCC) is becoming increasingly important. This is the main destination that has promoted growing imports of natural gas, currently accounting for about 20% of the total national annual consumption. Available crude oil is becoming heavier; thus refineries should be able to process it, and to handle greater quantities of refinery residuals. If all refinery residuals are used in cogeneration plants serving petroleum refineries, the high heat/power ratio of refinery needs, leads to the availability of appreciable quantities of electricity that can be exported to the public utility. Thus, in a global perspective, Mexican imports of natural gas may be reduced by cogeneration using refinery residuals. This is not the authors' idea; in fact, PEMEX, the national oil company, has been entitled by the Mexican congress to sell its power leftovers to The Federal Electricity Commission (CFE) in order to use cogeneration in the way described for the years to come. A systematic way of determining the cogeneration potential by using refinery residuals from Mexican refineries is presented here, taking into account residual quantities and composition, from a national perspective, considering expected scenarios for Maya crude content going to local refineries in the years to come. Among different available technologies for cogeneration using refinery residuals, it is believed that the integrated gasification combined cycle (IGCC) would be the best option. Thus, considering IGCC plants supplying heat and power to refineries where it is projected to have refinery residuals for cogeneration, the expected electric power that can be sent to the public utility is quantified, along with the natural gas imports mitigation that may be attained. This in turn would contribute to a necessary fuel diversification policy balancing energy, economy and

  7. Eldorado Port Hope refinery - uranium production (1933-1951)

    International Nuclear Information System (INIS)

    Arsenault, J.E.

    2008-01-01

    Since the discovery of pitchblende in 1930 by Gilbert LaBine at Great Bear Lake (GBL), North West Territories, uranium has played a central role in the growth of the Canadian mining sector and it in turn has propelled the country into it's present position as the world's top uranium producer. The rich ore mined there was used originally by Eldorado Gold Mines Limited to build a business based on the extraction of radium, which was selling at $70,000 a gram at the time, and silver which was present in the ore in commercial amounts. The mine site on GBL became known as Port Radium. In 1933 Eldorado brought a refinery on-line at Port Hope, Ontario nearly 4,000 miles away from the mine, and began to produce radium, silver and uranium products. Initially uranium played a minor role in the business and the products were sold into the ceramics industry to manufacture a variety of crockery with long-lasting colours. In addition, there were sales and loans of uranium products to research laboratories that were exploring nuclear energy for possible use in weapons and power generation, as the potential for this was clearly understood from 1939 onwards. These laboratories included the National Research Council (George Laurence), Columbia University (Enrico Fermi) and International Chemical Industries (J.P. Baxter). With the beginning of World War II the radium business suffered from poor sales and by 1940 the mine was closed but the refinery continued operation, using accumulated stockpiles. By 1942 uranium had become a strategic material, the mine was reopened, and the refinery began to produce large quantities of uranium oxide destined for The Manhattan Project. As events unfolded Eldorado was unable to produce sufficient ore from GBL so that a large quantity of ore from the Belgian Congo was also processed at Port Hope. Ultimately, as a result of the efforts of this enterprise, World War II was finally ended by use of atomic weapons. After World War II the refinery

  8. Eldorado Port Hope refinery - uranium production (1933-1951)

    Energy Technology Data Exchange (ETDEWEB)

    Arsenault, J.E

    2008-03-15

    Since the discovery of pitchblende in 1930 by Gilbert LaBine at Great Bear Lake (GBL), North West Territories, uranium has played a central role in the growth of the Canadian mining sector and it in turn has propelled the country into it's present position as the world's top uranium producer. The rich ore mined there was used originally by Eldorado Gold Mines Limited to build a business based on the extraction of radium, which was selling at $70,000 a gram at the time, and silver which was present in the ore in commercial amounts. The mine site on GBL became known as Port Radium. In 1933 Eldorado brought a refinery on-line at Port Hope, Ontario nearly 4,000 miles away from the mine, and began to produce radium, silver and uranium products. Initially uranium played a minor role in the business and the products were sold into the ceramics industry to manufacture a variety of crockery with long-lasting colours. In addition, there were sales and loans of uranium products to research laboratories that were exploring nuclear energy for possible use in weapons and power generation, as the potential for this was clearly understood from 1939 onwards. These laboratories included the National Research Council (George Laurence), Columbia University (Enrico Fermi) and International Chemical Industries (J.P. Baxter). With the beginning of World War II the radium business suffered from poor sales and by 1940 the mine was closed but the refinery continued operation, using accumulated stockpiles. By 1942 uranium had become a strategic material, the mine was reopened, and the refinery began to produce large quantities of uranium oxide destined for The Manhattan Project. As events unfolded Eldorado was unable to produce sufficient ore from GBL so that a large quantity of ore from the Belgian Congo was also processed at Port Hope. Ultimately, as a result of the efforts of this enterprise, World War II was finally ended by use of atomic weapons. After World War II the

  9. Insights from the analyses of risk-informed extension of diesel generator allowed outage time

    International Nuclear Information System (INIS)

    Lin, J.C.; He Wei

    2005-01-01

    In recent years, many U.S. nuclear plants have applied and received approval for the risk-informed extension of the Allowed Outage Time (AOT) for Emergency Diesel Generators (EDGs). These risk-informed applications need to meet the regulatory guidance on the risk criteria. This paper discusses in detail insights derived from the risk-informed analyses performed to support these applications. The risk criteria on ΔCDF/ΔLERF evaluate the increase in average risk by extending the AOT for EDGs, induced primarily by an increase in EDG maintenance unavailability due to the introduction of additional EDG preventive maintenance. By performing this preventive maintenance work on-line, the outage duration can be shortened. With proper refinement of the risk model, most plants can meet the ΔCDF/ΔLERF criteria for extending the EDGAOT from, for example, 3 days to 14 days. The key areas for model enhancements to meet these criteria include offsite/onsite power recovery, LERF modeling, etc. The most important LERF model enhancements consist of refinement of the penetrations included in the containment isolation model for the consideration of a large release, and taking credit for operator vessel depressurization during the time period between core damage and vessel failure. A recent study showed that although the frequency of loss of offsite power (LOSP) has decreased, the duration of offsite power recovery has actually increased. However, many of the events used to derive this conclusion may not be applicable to PRAs. One approach develops the offsite power non-recovery factor by first screening the LOSP events for applicability to the plant being analyzed, power operation, and LOSP initiating event, then using the remaining events data for the derivation based on the fraction of events with recovery duration longer than the time window allowed. The risk criteria on ICCDP/ICLERP examine the increase in risk from the average CDF/LERF, based on the increased maintenance

  10. Economic forces push down selling prices of U.S. refineries

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Recent data on US refinery sales reveal that selling prices have continued to decline in the 1990s. Reasons for this decrease include increased plant investments to meet regulatory requirements, excess refining capacity, increased imports of refined products, and reduced margins. While these expenditures enable a refinery to continue operating, they do not make the refinery more profitable or valuable. Other factors contributing to reduced selling prices of US refineries are: declining local crude production; unstable crude costs; increased energy conservation; growing competition from alternative fuels

  11. Proceedings of a joint OECD/NEA-IAEA symposium on human factors and organisation in NPP maintenance outages: impact on safety

    International Nuclear Information System (INIS)

    1995-01-01

    The sessions of this conference dealt with outage strategy and methods (in Sweden, France and United States), the organisation and management of outages (organisation during refuelling shutdowns in France, safety approaches in France, in the USA, in Canada, in the United Kingdom and in Sweden), case studies and lessons learned (in France, Korea, Sweden, UK, USA), regulatory aspects of outages (UK, Germany, Mexico, France), the development of outage techniques

  12. Impact of Co-Channel Interference on the Outage Performance Under Multiple Type II Relay Environments

    KAUST Repository

    Choi, Seyeong; Alouini, Mohamed-Slim; Nam, Sung Sik

    2017-01-01

    In this paper, through an exact analysis of the outage probability, we investigate the impact of co-channel interference (CCI) on the outage performance of type II (or user equipment) relay under multiple-relay environments considering the selection combining-based relay selection scheme with the decode-and-forward protocol. We consider the signal to interference plus noise ratio (SINR) over both independent and identically distributed and independent but non-identically distributed fading channels. To fully take into account the effect of CCI, we adopt a more practical parameter such as the CCI coefficient. The major difficulty in the analysis resides in the determination of the statistics of the output SINR. To settle this problem, we first present the general but relatively simplified expressions for the statistics and then the related outage probability in closed-form. Furthermore, to consider more practical scenario, based on the fact that the number of participating relays can be random, we investigate the average outage probability by averaging the number of participating relays.

  13. On the Outage Performance of Full-Duplex Selective Decode-and-Forward Relaying

    KAUST Repository

    Khafagy, Mohammad Galal; Ismail, Amr; Alouini, Mohamed-Slim; Aissa, Sonia

    2013-01-01

    expression for the end-to-end outage probability that captures their joint effect. With the derived expression in hand, we propose a relay transmit power optimization scheme that only requires the relay knowledge of channel statistics. Finally, we corroborate our analysis with simulations.

  14. 77 FR 63757 - Extension of the Commission's Rules Regarding Outage Reporting to Interconnected Voice Over...

    Science.gov (United States)

    2012-10-17

    ... telephone subscriptions in the United States were users of interconnected VoIP providers--an increase of 21... Commission's Rules Regarding Outage Reporting to Interconnected Voice Over Internet Protocol Service Providers and Broadband Internet Service Providers AGENCY: Federal Communications Commission. ACTION: Final...

  15. Outage Analysis and Optimization of SWIPT in Network-Coded Two-Way Relay Networks

    Directory of Open Access Journals (Sweden)

    Ruihong Jiang

    2017-01-01

    Full Text Available This paper investigates the outage performance of simultaneous wireless information and power transfer (SWIPT in network-coded two-way relay systems, where a relay first harvests energy from the signals transmitted by two sources and then uses the harvested energy to forward the received information to the two sources. We consider two transmission protocols, power splitting two-way relay (PS-TWR and time switching two-way relay (TS-TWR protocols. We present two explicit expressions for the system outage probability of the two protocols and further derive approximate expressions for them in high and low SNR cases. To explore the system performance limits, two optimization problems are formulated to minimize the system outage probability. Since the problems are nonconvex and have no known solution methods, a genetic algorithm- (GA- based algorithm is designed. Numerical and simulation results validate our theoretical analysis. It is shown that, by jointly optimizing the time assignment and SWIPT receiver parameters, a great performance gain can be achieved for both PS-TWR and TS-TWR. Moreover, the optimized PS-TWR always outperforms the optimized TS-TWR in terms of outage performance. Additionally, the effects of parameters including relay location and transmit powers are also discussed, which provide some insights for the SWIPT-enabled two-way relay networks.

  16. A Study on the Frequency of Initiating Event of OPR-1000 during Outage Periods

    Energy Technology Data Exchange (ETDEWEB)

    Hong Jae Beol; Jae, Moo Sung [Hanyang Univ., Seoul (Korea, Republic of)

    2013-10-15

    These sources of data did not reflect the latest event data which have occurred during the PWR outage to the frequencies of initiating event Electric Power Research Institute(EPRI) in USA collected the data of loss of decay heat removal during outage from 1989 to 2009 and published technical report. Domestic operating experiences for LOOP is gathered in Operational Performance Information System for Nuclear Power Plant(OPIS). To reduce conservatism and obtain completeness for LPSD PSA, those data should be collected and used to update the frequencies. The frequencies of LOSDC and LOOP are reevaluated using the data of EPRI and OPIS in this paper. Quantification is conducted to recalculate core damage frequency(CDF), since the rate is changed. The results are discussed below. To make an accurate estimate of the initiating events of LPSD PSA, the event data were collected and the frequencies of initiating events were updated using Bayesian approach. CDF was evaluated through quantification. Δ CDF is -40% and the dominant contributor is pressurizer PSV stuck open event. The most of the event data in EPRI TR were collected from US nuclear power plant industry. Those data are not enough to evaluate outage risk precisely. Therefore, to reduce conservatism and obtain completeness for LPSD PSA, the licensee event report and domestic data should be collected and reflected to the frequencies of the initiating events during outage.

  17. Economic and Environmental Impacts of the Columbia-Snake River Extended Lock Outage

    Science.gov (United States)

    2012-03-01

    This reports main objective is to analyze the change in rates and modal costs for shippers, commodity industries and ports prior to, during and after the fifteen week lock outage and to determine the impacts on the environment in the form of energ...

  18. On the outage capacity of the block fading channel at low-power regime

    KAUST Repository

    Rezki, Zouheir; Alouini, Mohamed-Slim

    2014-01-01

    the transmitter and the receiver (CSI-TR), under a short-term power constraint. We show that selection diversity that allocates all the power to the strongest block is asymptotically optimal. Then, we provide a simple characterization of the outage probability

  19. Outage and BER analysis for ultrawideband-based WPAN in Nakagami-m fading channels

    KAUST Repository

    Mehbodniya, Abolfazl; Aissa, Sonia

    2011-01-01

    layer. Approximate expressions for the outage probability and average bit error rate (BER) are derived in closed form for the MB-OFDM target receiver, taking into account multi-user interference (MUI), as well as external interference in the form of time

  20. Health and maintenance outages in nuclear power plants: an epidemiological survey

    International Nuclear Information System (INIS)

    Telle, M.A.; Huez, D.; Niedbala, J.M.; Auclair, J.; Canales, J.P.; Duverge, C.; Forest, H.; Gerondal, M.; Paris, P.M.; Renault, J.C.; Bossevain, L.; Blaise, P.; Blanc, M.C.; Goldberg, M.; Charpak, Y.

    1995-01-01

    An epidemiological survey, started in 1989, was carried out at the nuclear power plants in the Loire river valley and at Le Blayais (France). Working conditions, work organisation and their impact on health during annual maintenance outages were studied. The main areas covered in this cross-sectional study were: anxiety and symptoms of depression using the Spielberger and CES-D scales. Comparisons were made during both a scheduled outage and in normal operation on four distinct groups of workers, each individual being his own control. A chi-square test was used for the quantitative variables and a test on differences for the quantitative variables. During a unit outage, more frequent overtime and atypical working hours were reported (p<0.01); working rhythms and safety rules were felt as more restrictive and exposure to radiation higher (p<0.01). Detrimental modifications of anxiety and symptoms of depression were observed on controllers whereas expected on maintenance agents. Similar results were observed when considering the rates of outages. Possible readings are given with reference to qualitative studies carried out on this topic, which implies extending our research with both the quantitative and qualitative approaches. (authors). 10 refs., 6 tabs

  1. Impact of Co-Channel Interference on the Outage Performance Under Multiple Type II Relay Environments

    KAUST Repository

    Choi, Seyeong

    2017-11-15

    In this paper, through an exact analysis of the outage probability, we investigate the impact of co-channel interference (CCI) on the outage performance of type II (or user equipment) relay under multiple-relay environments considering the selection combining-based relay selection scheme with the decode-and-forward protocol. We consider the signal to interference plus noise ratio (SINR) over both independent and identically distributed and independent but non-identically distributed fading channels. To fully take into account the effect of CCI, we adopt a more practical parameter such as the CCI coefficient. The major difficulty in the analysis resides in the determination of the statistics of the output SINR. To settle this problem, we first present the general but relatively simplified expressions for the statistics and then the related outage probability in closed-form. Furthermore, to consider more practical scenario, based on the fact that the number of participating relays can be random, we investigate the average outage probability by averaging the number of participating relays.

  2. 76 FR 36892 - Proposed Extension of Part 4 of the Commission's Rules Regarding Outage Reporting to...

    Science.gov (United States)

    2011-06-23

    ...: None. Title: Communications Outage Reporting for Interconnected Voice over Internet Protocol Service.... Type of Review: New collection. Respondents: Businesses (Interconnected Voice over Internet Protocol... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 4 [PS Docket No. 11-82; FCC 11-74] Proposed...

  3. Outage performance of reactive cooperation in Nakagami-m fading channels

    KAUST Repository

    Benjillali, Mustapha; Alouini, Mohamed-Slim

    2010-01-01

    In this paper, we investigate the outage performance of Decode-and-Forward with reactive relaying in dual-hop cooperetive Nakagaml-m fading links. The destination, based on the umque knowledge of local second hop channel state information, selects

  4. Consequences of long-term power outages and high electricity prices lasting for months

    International Nuclear Information System (INIS)

    2005-01-01

    Several areas in the world have experienced electricity outages for longer periods of time, but the consequences of these are sparsely documented. There is a need for further analysis of the socioeconomic consequences of the outages. In addition to KILE (Quality adjusted revenue framework for un supplied energy) costs one has to take into account that the costs often increase proportionally with the durance of the outage, and that KILE tariffs do not reflect lost consumer's surplus for products that are not produced during an outage. A good example is the public underground transport, where the company's economical loss can be significantly smaller than the loss of utility value for the travellers. If the authorities act with reasonability it is difficult to see that periods with very high prices represent a big problem. The most important problems are related to diffused effects, especially for households with a weak economy. These problems can be solved with improved contractual forms (price guarantees) or by transfers to the households, without weakening the incentives for electricity economising (ml)

  5. Industrial waste management - a case study at Attock oil refinery Ltd., Rawalpindi

    International Nuclear Information System (INIS)

    Ramay, M.I.; Hussain, S.; Tanveer, A.; Jabeen, Z.; Ehsann, S.

    2009-01-01

    As far as waste is concerned, industry has a two fold position: on the one hand industry produces waste during the production processes and on the other hand most of the industrial products become waste after being used. From environment perspective waste management and minimization at the source has become important issue all over the world. Waste minimization leading to cleaner production is the process and the policy of reducing the amount of waste produced by Industry at the source and remaining should be managed.The core objective of this research paper is to examine the impact of waste minimization, waste management and the planning of effective waste utilization that increases organizations profitability and green image. The case study will present the Recycle, Reuse, Reduce strategy that waste management is not only necessary to keep the environment healthy but it also brings the financial savings to the organization. It is obvious that there is significant relationship between waste management and profitability. Attock Refinery Limited (ARL) has done significant work in the field of industrial waste management. The stratified sampling has also used during a survey to gather primary data i.e. congregated by administering questionnaires to employees of different departments that shows positive attitude towards waste minimization and management. The interventions regarding industrial waste management are in full practice at ARL to meet the National Environmental Quality Standards. In 1993, prominent step has been taken to address the environmental issues and waste management. After carrying out the detailed survey of effluent waste water system during 1995-1996, Effluent Treatment Plants were installed to meet the NEQS. Keeping the continuity of efforts 'Zero Discharge' of effluent waste from the refinery was targeted. This project is recycling the waste water resulting environment conservation and saving money that was being spent for water pumping from

  6. ALARA and planning of interventions

    Energy Technology Data Exchange (ETDEWEB)

    Rocaboy, A. [Electricite de France, Avoine (France)

    1995-03-01

    The implementation of ALARA programs implies integration of radiation protection criterion at all stages of outage management. Within the framework of its ALARA policy, Electricide de France (EDF) has given an incentive to all of its nuclear power plants to develop {open_quotes}good practices{close_quotes} in this domain, and to exchange their experience by the way of a national feed back file. Among the developments in the field of outage organization, some plants have focused on the planning stage of activities because of its influence on the radiological conditions of interventions and on the good succession of tasks within the radiological controlled areas. This paper presents the experience of Chinon nuclear power plant. At Chinon, we are pursuing this goal through careful outage planning. We want the ALARA program during outages to be part of the overall maintenance task planning. This planning includes the provision of the availability of every safety-related component, and of the variations of water levels in hthereactor and steam generators to take advantage of the shield created by the water. We have developed a computerized data base with the exact position of all the components in the reactor building in order to avoid unnecessary interactions between different tasks performed in the same room. A common language between Operation and Maintenance had been established over the past years, using {open_quotes}Milestones and Corridors{close_quotes}. A real time dose rate counting system enables the Radiation Protection (RP) Department to do an accurate and efficient follow up during the outage for all the {open_quotes}ALARA{close_quotes} maintenance tasks.

  7. Thermoeconomic and environmental assessment of a crude oil distillation unit of a Nigerian refinery

    International Nuclear Information System (INIS)

    Waheed, M.A.; Oni, A.O.; Adejuyigbe, S.B.; Adewumi, B.A.

    2014-01-01

    The renovation of refineries should be aimed at achieving the highest possible technical efficiencies at a considerable investment cost and not only at replacing damaged components to attain full capacity utilisation. This study examined a crude distillation unit (CDU) of a Nigerian refinery plant comprising the atmospheric distillation unit (ADU), vacuum distillation unit (VDU), preflash unit (PFU), splitter unit (SPU), stabiliser unit (SBU) and heat exchanger network (HEN) to determine critical areas of inefficiencies as the plant managements plan renovation. Using real plant data, the CDU was simulated with Aspen Hysys ® and the thermoeconomic and environmental analyses were carried out. The results show that the energy and exergy efficiencies of the CDU were 9.0 and 4.0% respectively. The specific CO 2 emission was 3.67 kg CO 2 /bbl. The highly inefficient subunits accounting for 77.4 and 90.0% of the overall energy and exergy losses respectively and 60.3% of the emission released were the PFU, ADU and HEN. The highly inefficient components are the furnaces which accounted for 51.6% of the overall exergy losses. The environmental and economic analysis also indicated that these components are the most potent for improvement. The columns of the PFU and ADU should be revamped to reduce their energy demands and the HEN should be modified to minimise effluent losses. - Highlights: •The assessment of a crude distillation unit (CDU) in Nigeria was carried out. •The assessment considered thermodynamic, thermoeconomic and environment analysis. •The assessment revealed areas with poor performance in the CDU. •Large thermodynamic and economic losses are responsible for the poor performance. •Areas with large losses and emission rate should be targeted for improvement

  8. Thermoeconomic and environmental assessment of a crude oil distillation unit of a Nigerian refinery

    Energy Technology Data Exchange (ETDEWEB)

    Waheed, M. A. [Department of Mechanical Engineering, Federal University of Agriculture, Abeokuta, P.M.B. 2240, Abeokuta, Ogun State (Nigeria); Oni, A.O., E-mail: fem2day@yahoo.com [Department of Mechanical Engineering, Federal University of Agriculture, Abeokuta, P.M.B. 2240, Abeokuta, Ogun State (Nigeria); Adejuyigbe, S. B. [Department of Mechanical Engineering, Federal University of Agriculture, Abeokuta, P.M.B. 2240, Abeokuta, Ogun State (Nigeria); Adewumi, B. A. [Department of Agricultural Engineering, Federal University of Agriculture, Abeokuta, P.M.B. 2240, Abeokuta, Ogun State (Nigeria)

    2014-05-01

    The renovation of refineries should be aimed at achieving the highest possible technical efficiencies at a considerable investment cost and not only at replacing damaged components to attain full capacity utilisation. This study examined a crude distillation unit (CDU) of a Nigerian refinery plant comprising the atmospheric distillation unit (ADU), vacuum distillation unit (VDU), preflash unit (PFU), splitter unit (SPU), stabiliser unit (SBU) and heat exchanger network (HEN) to determine critical areas of inefficiencies as the plant managements plan renovation. Using real plant data, the CDU was simulated with Aspen Hysys{sup ®} and the thermoeconomic and environmental analyses were carried out. The results show that the energy and exergy efficiencies of the CDU were 9.0 and 4.0% respectively. The specific CO{sub 2} emission was 3.67 kg CO{sub 2}/bbl. The highly inefficient subunits accounting for 77.4 and 90.0% of the overall energy and exergy losses respectively and 60.3% of the emission released were the PFU, ADU and HEN. The highly inefficient components are the furnaces which accounted for 51.6% of the overall exergy losses. The environmental and economic analysis also indicated that these components are the most potent for improvement. The columns of the PFU and ADU should be revamped to reduce their energy demands and the HEN should be modified to minimise effluent losses. - Highlights: •The assessment of a crude distillation unit (CDU) in Nigeria was carried out. •The assessment considered thermodynamic, thermoeconomic and environment analysis. •The assessment revealed areas with poor performance in the CDU. •Large thermodynamic and economic losses are responsible for the poor performance. •Areas with large losses and emission rate should be targeted for improvement.

  9. Thermodynamic simulation and evaluation of sugar refinery evaporators using a steady state modelling approach

    International Nuclear Information System (INIS)

    Lewis, A.E.; Khodabocus, F.; Dhokun, V.; Khalife, M.

    2010-01-01

    In a sugar refinery, the juice is concentrated through evaporation, with the objective of concentrating the juice to syrup as rapidly as possible. Because the heat of vaporization of water is relatively high, the evaporation process can be highly energy intensive, and therefore the economical use of steam is important in the refinery. This paper reports on the development of a simulation model for the evaporation sections of two Mauritian sugar refineries. The first objective was to use the simulation model to carry out an energy balance over the evaporators in order to assess the economy of steam usage over the refinery. The second objective was to examine to what extent a fundamental steady state model, based on thermodynamics (not kinetics) was capable of predicting the material and energy flows in two operating sugar refineries and thereby to evaluate the applicability of the modelling framework. The simulation model was validated using historical data as well as data from the plant DCS system. The simulation results generally correlated well with the measured values, except for one of the evaporators on one refinery. Some suggestions were made as to the cause of the discrepancy. On balance, it was found that both refineries are extremely efficient in terms of steam and equipment usage and that there is not much scope for energy optimisation within the present configuration - nor for much spare steam capacity for an additional refinery. It was also shown that steady state process simulation, using thermodynamic models, can generate a very useful representation of a working refinery. Besides being able to use the model to 'benchmark' the operation and thus evaluate its performance as a whole as well as across individual units, it could also be used to evaluate refinery performance across refineries, nationally as well as globally.

  10. Basic survey for Joint Implementation on Jinling Petrochemical Corporation, China. Energy conservation project for Nanjing Refinery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, the basic survey was conducted on potential energy conservation at Nanjing Refinery, Jiangsu Nanjing city, China. Investigational studies were made on the repair of the power recovery system in line with the plan to enlarge the fluid catalytic cracker (FCC) and the power recovery using exhaust gas from the RFCC catalytic regeneration system. Moreover, the energy conservation technology to reduce power loads of the refining system was adopted to this project. As a result, it was found out that this repair plan makes recovery of the power equivalent to 10.6MW possible and produces the effect of reducing the fuel to be used. The realization of this project brings the CO2 reduction amount of approximately 70,000 t/y. It was also found out that this project not only reduces a large amount of greenhouse effect gas emissions, but contributes to profits of the plant concerned and helps improve the environment in the area concerned. For the implementation of this project, the detailed plan is expected to be further discussed. (NEDO)

  11. Refinery evaluation of optical imaging to locate fugitive emissions.

    Science.gov (United States)

    Robinson, Donald R; Luke-Boone, Ronke; Aggarwal, Vineet; Harris, Buzz; Anderson, Eric; Ranum, David; Kulp, Thomas J; Armstrong, Karla; Sommers, Ricky; McRae, Thomas G; Ritter, Karin; Siegell, Jeffrey H; Van Pelt, Doug; Smylie, Mike

    2007-07-01

    Fugitive emissions account for approximately 50% of total hydrocarbon emissions from process plants. Federal and state regulations aiming at controlling these emissions require refineries and petrochemical plants in the United States to implement a Leak Detection and Repair Program (LDAR). The current regulatory work practice, U.S. Environment Protection Agency Method 21, requires designated components to be monitored individually at regular intervals. The annual costs of these LDAR programs in a typical refinery can exceed US$1,000,000. Previous studies have shown that a majority of controllable fugitive emissions come from a very small fraction of components. The Smart LDAR program aims to find cost-effective methods to monitor and reduce emissions from these large leakers. Optical gas imaging has been identified as one such technology that can help achieve this objective. This paper discusses a refinery evaluation of an instrument based on backscatter absorption gas imaging technology. This portable camera allows an operator to scan components more quickly and image gas leaks in real time. During the evaluation, the instrument was able to identify leaking components that were the source of 97% of the total mass emissions from leaks detected. More than 27,000 components were monitored. This was achieved in far less time than it would have taken using Method 21. In addition, the instrument was able to find leaks from components that are not required to be monitored by the current LDAR regulations. The technology principles and the parameters that affect instrument performance are also discussed in the paper.

  12. High temperature degradation in power plants and refineries

    Directory of Open Access Journals (Sweden)

    Furtado Heloisa Cunha

    2004-01-01

    Full Text Available Thermal power plants and refineries around the world share many of the same problems, namely aging equipment, high costs of replacement, and the need to produce more efficiently while being increasingly concerned with issues of safety and reliability. For equipment operating at high temperature, there are many different mechanisms of degradation, some of which interact, and the rate of accumulation of damage is not simple to predict. The paper discusses the mechanisms of degradation at high temperature and methods of assessment of such damage and of the remaining safe life for operation.

  13. Yearly refinery construction indexes listed for 68 years

    International Nuclear Information System (INIS)

    Farrar, G.

    1996-01-01

    Yearly values are presented for the Nelson-Farrar refinery inflation cost index since 1926. They are based on 1946 as 100, since that was the date of index inception. Values from 1926 to 1945 were back calculated. Data are presented on indexed cost of materials, labor, and miscellaneous equipment for 1926 through 1994. A second table of itemized refining cost indexes for the years 1954, 1972, 1992--1994, and the first eight months of 1995 is also presented. This table subdivides materials, labor, and equipment into component costs

  14. Capital vs. service contract at Conoco Humber Refinery

    International Nuclear Information System (INIS)

    Threlfall, Peter; Sperring, Simon

    1999-01-01

    The value of outsourcing for water treatment is illustrated through experience at the Conoco Humber refinery. A point was reached where the quality of water at the plant was so poor that demineralized water was brought to the site by tanker. The paper describes how and why it was decided to design, build, operate and maintain an outsourced system. It points out how the newer technologies can be environmentally friendly and, at the same time, reduce operating and maintenance costs, optimise manpower and cut management costs. (UK)

  15. Microbial enhanced separation of oil from a petroleum refinery sludge.

    Science.gov (United States)

    Joseph, P J; Joseph, Ammini

    2009-01-15

    Petroleum refineries around the world have adopted different technological options to manage the solid wastes generated during the refining process and stocking of crude oil. These include physical, chemical and biological treatment methods. In this investigation bacterial mediated oil separation is effected. Two strains of Bacillus were isolated from petroleum-contaminated soils, and inoculated into slurry of sludge, and sludge-sand combinations. The bacteria could effect the separation of oil so as to form a floating scum within 48h with an efficiency of 97% at < or =5% level of sludge in the sludge-sand mixture. The activity was traced to the production of biosurfactants by bacteria.

  16. 40 CFR 80.1280 - How are refinery benzene baselines calculated?

    Science.gov (United States)

    2010-07-01

    ... benzene). i = Individual batch of gasoline produced at the refinery from January 1, 2004 through December 31, 2005. n = Total number of batches of gasoline produced at the refinery from January 1, 2004... PROGRAMS (CONTINUED) REGULATION OF FUELS AND FUEL ADDITIVES Gasoline Benzene Averaging, Banking and Trading...

  17. Sounding pollution and the refinery environmental risks; A poluicao sonora e os riscos ambientais das refinarias

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    This chapter gives a general overview on the effects of the sound pollution, the principal pollutants emitted by the oil refineries, control actions for the sound waves emissions, the minimization actions, the risk concepts and evaluation, the risk perception and the accidents in refineries.

  18. Environmental nickel exposure from oil refinery emissions: a case study in Ecuador.

    Science.gov (United States)

    Harari, Raúl; Harari, Florencia; Forastiere, Francesco

    2016-01-01

    Nickel is a strong skin and respiratory sensitizer and a recognized carcinogen. Oil refineries are important sources of atmospheric emissions of toxic pollutants, including nickel. Populations residing close to oil refineries are at potential risk. The aim of this study was to evaluate the exposure to nickel in a population living close to the largest oil refinery in Ecuador, located in the city of Esmeraldas. We recruited 47 workers from the oil refinery as well as 195 students from 4 different schools close to the plant and 94 students from another school 25 km far from the industry. Urinary nickel concentrations were used to assess the exposure to nickel. Students from the school next to the oil refinery showed the highest urinary nickel concentrations while workers from the refinery showed the lowest concentrations. Median nickel concentrations were > 2µg/L in all study groups. The populations living close to the oil refineries are potentially exposed to nickel from atmospheric emissions. Further studies investigating nickel-related health effects in the population residing close to the refinery of Esmeralda are needed.

  19. 76 FR 64943 - Proposed Cercla Administrative Cost Recovery Settlement; ACM Smelter and Refinery Site, Located...

    Science.gov (United States)

    2011-10-19

    ... Settlement; ACM Smelter and Refinery Site, Located in Cascade County, MT AGENCY: Environmental Protection... projected future response costs concerning the ACM Smelter and Refinery NPL Site (Site), Operable Unit 1..., Helena, MT 59626. Mr. Sturn can be reached at (406) 457-5027. Comments should reference the ACM Smelter...

  20. Risk analysis of the sea desalination plant at the 5th refinery of south ...

    African Journals Online (AJOL)

    In this study, hazards in the desalination unit of a gas refinery in Asaluyeh, south of Iran was evaluated, using the PHA-PRO6 software, for which recommendations were made to avoid potential risks involved. Based on 8-years history of the refinery operation, maintenance records, accidents, safety vulnerabilities of the plant ...

  1. 40 CFR 73.90 - Allowance allocations for small diesel refineries.

    Science.gov (United States)

    2010-07-01

    ... refineries. 73.90 Section 73.90 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Small Diesel Refineries § 73.90 Allowance allocations... application for certification, submitted to the address in § 73.13 of this chapter, shall include the...

  2. The Implementation and Maintenance of a Behavioral Safety Process in a Petroleum Refinery

    Science.gov (United States)

    Myers, Wanda V.; McSween, Terry E.; Medina, Rixio E.; Rost, Kristen; Alvero, Alicia M.

    2010-01-01

    A values-centered and team-based behavioral safety process was implemented in a petroleum oil refinery. Employee teams defined the refinery's safety values and related practices, which were used to guide the process design and implementation. The process included (a) a safety assessment; (b) the clarification of safety-related values and related…

  3. 76 FR 42052 - National Emission Standards for Hazardous Air Pollutants From Petroleum Refineries

    Science.gov (United States)

    2011-07-18

    ...-AO55 National Emission Standards for Hazardous Air Pollutants From Petroleum Refineries AGENCY... the National Emission Standards for Hazardous Air Pollutants From Petroleum Refineries. EPA is now... signed a final rule amending the National Emission Standards for Hazardous Air Pollutants From Petroleum...

  4. Conservation and reuse of water in Brazilian petroleum refineries; Conservacao e reuso de agua em refinarias de petroleo no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Pombo, Felipe Ramalho; Magrini, Alessandra; Szklo, Alexandre Salem [Universidade Federal do Rio de Janeiro (PPE/COPPE/UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-Graduacao de Engenharia. Programa de Planejamento Energetico], Emails: frpombo@ppe.ufrj.br, ale@ppe.ufrj.br, szklo@ppe.ufrj.br

    2010-07-01

    This paper views to present the main technologies for effluent treatment of petroleum refineries having as target the reuse. An analysis of international and Brazilian experiences of water reuse in petroleum refineries is performed viewing to support the proposition of recommendations for Brazilian refineries.

  5. Report of fiscal 1999 basic survey for joint implementation, etc. Feasibility study on energy conservation and reduction of CO2 emission at Omsk Refinery

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    This paper explains fiscal 1999 survey on energy conservation and reduction of CO2 at Omsk Refinery in the Russian Federation for the purpose of making the project tied to the COP3 joint implementation. This refinery is the largest class refinery in Russia having a capacity of 600,000 BPSD. The atmospheric distillation unit AVT-10, which emits 470,000 t-CO2/year, was selected for the object of the survey. As the modification plans, optimization of process system, modification of waste heat boiler and installation of new furnaces were considered. The plans 1, 2 are possible due to their low investment costs. The plan 3 to install new furnaces is able to reduce the large volume of CO2 emission though its investment cost is higher. For each modification plan, estimation was made for the investment cost, the benefit by energy saving and the volume of reduction of CO2 emission. The results for each of the plans 1, 2 and 3 were 907x10{sup 3}, 3,377x10{sup 3}, 50,400x10{sup 3} in US$; 535x10{sup 3}, 928x10{sup 3}, 1,407x10{sup 3} in US$; and 36.1x10{sup 3}, 68.2x10{sup 3}, 86.6x10{sup 3} tons/year. The Russian side showed their satisfaction of the results and keen interest in the energy saving effect. For the purpose of realizing this plan, financial assistance and technological cooperation are essential. Russia shows their great expectations for the Japanese government. (NEDO)

  6. Toward effective ecological risk-management of refinery corrective action

    International Nuclear Information System (INIS)

    Metzger, B.H.; Rury, P.M.; Turton, D.; Archibald, B.; Clark, J.; Cura, J.

    1995-01-01

    Cleanup of complex industrial sites, such as refineries, requires risk-based decision tools to ensure that environmentally protective remediation is consistent with current and future land use. However, conventional ecological risk assessment approaches are not well suited for complex industrial sites. Site risk assessments focus on hypothetical chemical risk assuming diverse and undisturbed ecosystems, rather than industrial and disturbed area conditions. In addition, they offer little guidance as to how to make timely and effective risk management decisions. An innovative methodology is proposed to assist industry and regulatory risk managers with rapid EcoRisk reconnaissance and cost-effective remedial decision-making at complex industrial sites. Phase 1 comprises a three-step risk screening of areas of ecological concern at the site, which integrates habitat quality characteristics and potential chemical hazards. It yields an ordering of areas as follows: areas of no significant risk; areas of potentially significant risk; and areas of likely significant risk. A decision rule is then applied to determine appropriate risk management action, including: no action; additional study; and remedial or management action. In Phase 2, additional study is conducted for areas that exhibit potentially significant risk so as to facilitate risk management. This methodology is currently being applied at the 1,300 acre, former Exxon Bayway Refinery in New Jersey

  7. Oil-refinery and automotive emissions of rare earth elements

    International Nuclear Information System (INIS)

    Kitto, M.E.; Gordon, G.E.; Anderson, D.L.; Olmez, I.

    1991-01-01

    The concentration pattern of rare-earth elements (REEs) in emissions from oil refineries and newer-model automobiles shows a distortion from the crustal abundance pattern. The REEs arise from the zeolite cracking catalysts used in petroleum refining and emission-control substrates used in automobile catalytic converters, respectively. Ten petroleum cracking catalysts from four countries and 12 catalytic converters from five automobile manufacturers were characterized for their REE content. The cracking catalysts are highly enriched in light REEs, whereas the automobile catalysts are enriched primarily in Ce. Incorporation of zeolite catalysts into refined oil provides new atmospheric elemental signatures for tracing emissions from refineries and oil-fired power plants on a regional scale. Though both have enhanced La/REE ratios, emissions from these two sources can be distinguished by their La/V ratios. Although REE demand by the petroleum industry has dropped considerably in recent years, automobile catalytic converters containing REEs are expected to increase dramatically as more stringent emission regulations are adopted in Europe, Japan and the US

  8. Effect of adoption of gas turbine in oil refinery

    Energy Technology Data Exchange (ETDEWEB)

    Tamai, Hiroto

    1988-08-01

    With progress in energy saving, and increase in automation in facilities, the dependence on electric power increases relative steam power. Further in order to reduce the production cost, the adoption of gas turbine combined cycle system, mainly aimed at power generation, is considered to be most suitable. This adoption, accompanied with the utilization of refinery offgas, dresults in a reduction in unit power generation cost, by increasing the ratio of domestic power generation. The gas turbine using deethanizing tower offgas as main fuel and butane as auxillary fuel, the combined cycle system, where steam produced from the turbine waste heat boiler drives the existing back pressure turbine, was constituted. The generator is 118 kVA in capacity. Against the maximum power demand being 16,500 kWh in the oil refinery, the obtainment of 11,000 kWh by the gas turbine and 2,500 kWh by the back pressure turbine was assured, with a considerable lowering in power to be purchased. (7 figs, 1 tab, 1 ref)

  9. Biodegradation of oil refinery wastes under OPA and CERCLA

    International Nuclear Information System (INIS)

    Banipal, B.S.; Myers, J.M.; Fisher, C.W.

    1995-01-01

    Land treatment of oil refinery wastes has been used as a disposal method for decades. More recently, numerous laboratory studies have been performed attempting to quantify degradation rates of more toxic polycyclic aromatic hydrocarbon compounds (PAHs). This paper discusses the results of the full-scale aerobic biodegradation operations using land treatment at the Macmillan Ring-Free Oil refining facility. The tiered feasibility approach in the evaluation of using biodegradation as a treatment method to achieve site-specific clean-up including pilot scale biodegradation operations is included in an earlier paper. Analytical results of biodegradation indicate that degradation rates observed in the laboratory can be met and exceeded under field conditions and that the site-specific cleanup criteria can be attained within a proposed project time. Also presented are degradation rates and half-lives for PAHs for which cleanup criteria has been established. PAH degradation rates and half-life values are determined and compared with the laboratory degradation rates and half-life values which used similar oil refinery wastes by other investigators (API 1987)

  10. Application of Ozone MBBR Process in Refinery Wastewater Treatment

    Science.gov (United States)

    Lin, Wang

    2018-01-01

    Moving Bed Biofilm Reactor (MBBR) is a kind of sewage treatment technology based on fluidized bed. At the same time, it can also be regarded as an efficient new reactor between active sludge method and the biological membrane method. The application of ozone MBBR process in refinery wastewater treatment is mainly studied. The key point is to design the ozone +MBBR combined process based on MBBR process. The ozone +MBBR process is used to analyze the treatment of concentrated water COD discharged from the refinery wastewater treatment plant. The experimental results show that the average removal rate of COD is 46.0%~67.3% in the treatment of reverse osmosis concentrated water by ozone MBBR process, and the effluent can meet the relevant standard requirements. Compared with the traditional process, the ozone MBBR process is more flexible. The investment of this process is mainly ozone generator, blower and so on. The prices of these items are relatively inexpensive, and these costs can be offset by the excess investment in traditional activated sludge processes. At the same time, ozone MBBR process has obvious advantages in water quality, stability and other aspects.

  11. The regulation of uranium refineries and conversion facilities in Canada

    International Nuclear Information System (INIS)

    Didyk, J.P.

    1986-04-01

    The nuclear regulatory process as it applies to uranium refineries and conversion facilities in Canada is reviewed. In the early 1980s, Eldorado Resources Limited proposed to construct and operate new facilities for refining yellowcake and for the production of uranium hexafluoride (UF 6 ). These projects were subject to regulation by the Atomic Energy Control Board (AECB). A description of the AECB's comprehensive licensing process covering all stages of siting, construction, operation and eventual decommissioning of nuclear facilities is traced as it was applied to the Eldorado projects. The AECB's concern with occupational health and safety, with public health and safety and with the protection of the environment in so far as it affects public health and safety is emphasized. Some regulatory difficulties encountered during the project's development which led to opening up the licensing process to public input and closer coordination of regulatory activities with other provincial and federal regulatory agencies are described. The Board's regulatory operational compliance program for uranium refineries and conversion facilities is summarized

  12. Improving secondary clarifier performance at the Oakville Oil Refinery

    International Nuclear Information System (INIS)

    Edwards, S.M.; Bagley, D.M.

    2002-01-01

    The purpose of this study was threefold: to investigate the relationship between settleability and the physical properties of activated sludge, to correlate settleability and key operational parameters such as chemical oxygen demand (COD) concentration at the aeration basin inlet and to determine potential operational improvements to the Oakville Oil Refinery Wastewater Treatment Plant. Nine separate sets of stirred sludge-settling tests were conducted over a six-month period to measure settleability. The stirred sludge volume index (SSVI), the zone settling constants, and the Zheng-Bagley compression constants were determined. State point analyses were conducted to determine the maximum solids flux of the clarifiers. The concentrations of Al, Mn, Mg, Fe, Ca, Na, and K were determined to identify potential correlations to settling characteristics. Extracellular polymeric substances were extracted from the sludge and analyzed for the same reason. The performance of the clarifiers was highly variable during the period examined. As the refinery process flows and effluent streams changed, influent COD increased, from an average of 180mg/L to 600mg/L. Concurrently the settleability of the sludge decreased from excellent (SSVI = 68mL/g) to very poor (150mL/g), perhaps as the result of under aeration. State point analyses indicated that the clarifiers are under-sized for process upsets of this magnitude. (author)

  13. Improving secondary clarifier performance at the Oakville Oil Refinery

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, S.M.; Bagley, D.M. [Univ. of Toronto, Dept. of Civil Engineering, Toronto, Ontario (Canada)

    2002-06-15

    The purpose of this study was threefold: to investigate the relationship between settleability and the physical properties of activated sludge, to correlate settleability and key operational parameters such as chemical oxygen demand (COD) concentration at the aeration basin inlet and to determine potential operational improvements to the Oakville Oil Refinery Wastewater Treatment Plant. Nine separate sets of stirred sludge-settling tests were conducted over a six-month period to measure settleability. The stirred sludge volume index (SSVI), the zone settling constants, and the Zheng-Bagley compression constants were determined. State point analyses were conducted to determine the maximum solids flux of the clarifiers. The concentrations of Al, Mn, Mg, Fe, Ca, Na, and K were determined to identify potential correlations to settling characteristics. Extracellular polymeric substances were extracted from the sludge and analyzed for the same reason. The performance of the clarifiers was highly variable during the period examined. As the refinery process flows and effluent streams changed, influent COD increased, from an average of 180mg/L to 600mg/L. Concurrently the settleability of the sludge decreased from excellent (SSVI = 68mL/g) to very poor (150mL/g), perhaps as the result of under aeration. State point analyses indicated that the clarifiers are under-sized for process upsets of this magnitude. (author)

  14. Electrochemical removal of phenol from oil refinery wastewater.

    Science.gov (United States)

    Abdelwahab, O; Amin, N K; El-Ashtoukhy, E-S Z

    2009-04-30

    This study explores the possibility of using electrocoagulation to remove phenol from oil refinery waste effluent using a cell with horizontally oriented aluminum cathode and a horizontal aluminum screen anode. The removal of phenol was investigated in terms of various parameters namely: pH, operating time, current density, initial phenol concentration and addition of NaCl. Removal of phenol during electrocoagulation was due to combined effect of sweep coagulation and adsorption. The results showed that, at high current density and solution pH 7, remarkable removal of 97% of phenol after 2h can be achieved. The rate of electrocoagulation was observed to increase as the phenol concentration decreases; the maximum removal rate was attained at 30 mg L(-1) phenol concentration. For a given current density using an array of closely packed Al screens as anode was found to be more effective than single screen anode, the percentage phenol removal was found to increase with increasing the number of screens per array. After 2h of electrocoagulation, 94.5% of initial phenol concentration was removed from the petroleum refinery wastewater. Energy consumption and aluminum Electrode consumption were calculated per gram of phenol removed. The present study shows that, electrocoagulation of phenol using aluminum electrodes is a promising process.

  15. Cathodic Protection Design Algorithms for Refineries Aboveground Storage Tanks

    Directory of Open Access Journals (Sweden)

    Kosay Abdul sattar Majbor

    2017-12-01

    Full Text Available Storage tanks condition and integrity is maintained by joint application of coating and cathodic protection. Iraq southern region rich in oil and petroleum product refineries need and use plenty of aboveground storage tanks. Iraq went through conflicts over the past thirty five years resulting in holding the oil industry infrastructure behind regarding maintenance and modernization. The primary concern in this work is the design and implementation of cathodic protection systems for the aboveground storage tanks farm in the oil industry. Storage tank external base area and tank internal surface area are to be protected against corrosion using impressed current and sacrificial anode cathodic protection systems. Interactive versatile computer programs are developed to provide the necessary system parameters data including the anode requirements, composition, rating, configuration, etc. Microsoft-Excel datasheet and Visual Basic.Net developed software were used throughout the study in the design of both cathodic protection systems. The case study considered in this work is the eleven aboveground storage tanks farm situated in al-Shauiba refinery in southern IRAQ. The designed cathodic protection systems are to be installed and monitored realistically in the near future. Both systems were designed for a life span of (15-30 years, and all their parameters were within the internationally accepted standards.

  16. [Occupational accidents in an oil refinery in Brazil].

    Science.gov (United States)

    Souza, Carlos Augusto Vaz de; Freitas, Carlos Machado de

    2002-10-01

    Work in oil refineries involves the risk of minor to major accidents. National data show the impact of accidents on this industry. A study was carried out to describe accident profile and evaluate the adequacy of accident reporting system. Data on all accidents reported in an oil refinery in the state of Rio de Janeiro for the year 1997 were organized and analyzed. The study population consisted of 153 injury cases, 83 hired and 69 contracted workers. The variables were: type of accident, operation mode and position of the worker injured. Among hired workers, minor accidents predominated (54.2%) and they occurred during regular operation activities (62.9%). Among contracted workers, there also predominated minor accidents (75.5%) in a higher percentage, but they occurred mainly during maintenance activities (96.8%). The study results showed that there is a predominance of accidents in lower hierarchy workers, and these accidents occur mainly during maintenance activities. There is a need to improve the company's accident reporting system and accident investigation procedures.

  17. Biodegradation of oil refinery wastes under OPA and CERCLA

    Energy Technology Data Exchange (ETDEWEB)

    Gamblin, W.W.; Banipal, B.S.; Myers, J.M. [Ecology and Environment, Inc., Dallas, TX (United States)] [and others

    1995-12-31

    Land treatment of oil refinery wastes has been used as a disposal method for decades. More recently, numerous laboratory studies have been performed attempting to quantify degradation rates of more toxic polycyclic aromatic hydrocarbon compounds (PAHs). This paper discusses the results of the fullscale aerobic biodegradation operations using land treatment at the Macmillan Ring-Free Oil refining facility. The tiered feasibility approach of evaluating biodegradation as a treatment method to achieve site-specific cleanup criteria, including pilot biodegradation operations, is discussed in an earlier paper. Analytical results of biodegradation indicate that degradation rates observed in the laboratory can be met and exceeded under field conditions and that site-specific cleanup criteria can be attained within a proposed project time. Also prevented are degradation rates and half-lives for PAHs for which cleanup criteria have been established. PAH degradation rates and half-life values are determined and compared with the laboratory degradation rates and half-life values which used similar oil refinery wastes by other in investigators (API 1987).

  18. A RLS-SVM Aided Fusion Methodology for INS during GPS Outages.

    Science.gov (United States)

    Yao, Yiqing; Xu, Xiaosu

    2017-02-24

    In order to maintain a relatively high accuracy of navigation performance during global positioning system (GPS) outages, a novel robust least squares support vector machine (LS-SVM)-aided fusion methodology is explored to provide the pseudo-GPS position information for the inertial navigation system (INS). The relationship between the yaw, specific force, velocity, and the position increment is modeled. Rather than share the same weight in the traditional LS-SVM, the proposed algorithm allocates various weights for different data, which makes the system immune to the outliers. Field test data was collected to evaluate the proposed algorithm. The comparison results indicate that the proposed algorithm can effectively provide position corrections for standalone INS during the 300 s GPS outage, which outperforms the traditional LS-SVM method. Historical information is also involved to better represent the vehicle dynamics.

  19. On the outage capacity of the block fading channel at low-power regime

    KAUST Repository

    Rezki, Zouheir

    2014-06-01

    Outage performance of the M-block fading with additive white Gaussian noise (BF-AWGN) is investigated at low-power regime. We consider delay-constrained constant-rate communications with perfect channel state information (CSI) at both the transmitter and the receiver (CSI-TR), under a short-term power constraint. We show that selection diversity that allocates all the power to the strongest block is asymptotically optimal. Then, we provide a simple characterization of the outage probability in the regime of interest. We quantify the reward due to CSI-TR over the constant-rate constant-power scheme and show that this reward increases with the delay constraint. For instance, for Rayleigh fading, we find that a power gain up to 4.3 dB is achievable. © 2014 IEEE.

  20. On the Outage Performance of Full-Duplex Selective Decode-and-Forward Relaying

    KAUST Repository

    Khafagy, Mohammad Galal

    2013-02-25

    We evaluate the outage performance in a three-terminal full-duplex relay channel that adopts a selective decode-and-forward protocol, taking relay self-interference into account. Previous work focused on coverage extension scenarios where direct source-destination transmissions are neglected or considered as interference. In this work, we account for the relay self-interference, and exploit the cooperative diversity offered by the independently fading source/relay message replicas that arrive at the destination. We present an approximate, yet accurate, closed-form expression for the end-to-end outage probability that captures their joint effect. With the derived expression in hand, we propose a relay transmit power optimization scheme that only requires the relay knowledge of channel statistics. Finally, we corroborate our analysis with simulations.

  1. A RLS-SVM Aided Fusion Methodology for INS during GPS Outages

    Directory of Open Access Journals (Sweden)

    Yiqing Yao

    2017-02-01

    Full Text Available In order to maintain a relatively high accuracy of navigation performance during global positioning system (GPS outages, a novel robust least squares support vector machine (LS-SVM-aided fusion methodology is explored to provide the pseudo-GPS position information for the inertial navigation system (INS. The relationship between the yaw, specific force, velocity, and the position increment is modeled. Rather than share the same weight in the traditional LS-SVM, the proposed algorithm allocates various weights for different data, which makes the system immune to the outliers. Field test data was collected to evaluate the proposed algorithm. The comparison results indicate that the proposed algorithm can effectively provide position corrections for standalone INS during the 300 s GPS outage, which outperforms the traditional LS-SVM method. Historical information is also involved to better represent the vehicle dynamics.

  2. Monitoring Disaster-Related Power Outages Using NASA Black Marble Nighttime Light Product

    Science.gov (United States)

    Wang, Z.; Román, M. O.; Sun, Q.; Molthan, A. L.; Schultz, L. A.; Kalb, V. L.

    2018-04-01

    Timely and accurate monitoring of disruptions to the electricity grid, including the magnitude, spatial extent, timing, and duration of net power losses, is needed to improve situational awareness of disaster response and long-term recovery efforts. Satellite-derived Nighttime Lights (NTL) provide an indication of human activity patterns and have been successfully used to monitor disaster-related power outages. The global 500 m spatial resolution National Aeronautics and Space Administration (NASA) Black Marble NTL daily standard product suite (VNP46) is generated from Visible Infrared Imaging Radiometer Suite (VIIRS) Day/Night Band (DNB) onboard the NASA/National Oceanic and Atmospheric Administration (NOAA) Suomi National Polar-orbiting Partnership (Suomi- NPP) satellite, which began operations on 19 January 2012. With its improvements in product accuracy (including critical atmospheric and BRDF correction routines), the VIIRS daily Black Mable product enables systematic monitoring of outage conditions across all stages of the disaster management cycle.

  3. MONITORING DISASTER-RELATED POWER OUTAGES USING NASA BLACK MARBLE NIGHTTIME LIGHT PRODUCT

    Directory of Open Access Journals (Sweden)

    Z. Wang

    2018-04-01

    Full Text Available Timely and accurate monitoring of disruptions to the electricity grid, including the magnitude, spatial extent, timing, and duration of net power losses, is needed to improve situational awareness of disaster response and long-term recovery efforts. Satellite-derived Nighttime Lights (NTL provide an indication of human activity patterns and have been successfully used to monitor disaster-related power outages. The global 500 m spatial resolution National Aeronautics and Space Administration (NASA Black Marble NTL daily standard product suite (VNP46 is generated from Visible Infrared Imaging Radiometer Suite (VIIRS Day/Night Band (DNB onboard the NASA/National Oceanic and Atmospheric Administration (NOAA Suomi National Polar-orbiting Partnership (Suomi- NPP satellite, which began operations on 19 January 2012. With its improvements in product accuracy (including critical atmospheric and BRDF correction routines, the VIIRS daily Black Mable product enables systematic monitoring of outage conditions across all stages of the disaster management cycle.

  4. Prediction of power system frequency response after generator outages using neural nets

    Energy Technology Data Exchange (ETDEWEB)

    Djukanovic, M B; Popovic, D P [Electrotechnicki Inst. ' Nikola Tesla' , Belgrade (Yugoslavia); Sobajic, D J; Pao, Y -H [Case Western Reserve Univ., Cleveland, OH (United States)

    1993-09-01

    A new methodology is presented for estimating the frequency behaviour of power systems necessary for an indication of under-frequency load shedding in steady-state security assessment. It is well known that large structural disturbances such as generator tripping or load outages can initiate cascading outages, system separation into islands, and even the complete breakup. The approach provides a fairly accurate method of estimating the system average frequency response without making simplifications or neglecting non-linearities and small time constants in the equations of generating units, voltage regulators and turbines. The efficiency of the new procedure is demonstrated using the New England power system model for a series of characteristic perturbations. The validity of the proposed approach is verified by comparison with the simulation of short-term dynamics including effects of control and automatic devices. (author)

  5. Outage Performance of Hybrid FSO/RF System with Low-Complexity Power Adaptation

    KAUST Repository

    Rakia, Tamer

    2016-02-26

    Hybrid free-space optical (FSO) / radio-frequency (RF) systems have emerged as a promising solution for high data- rate wireless communication systems. We consider truncated channel inversion based power adaptation strategy for coherent and non- coherent hybrid FSO/RF systems, employing an adaptive combining scheme. Specifically, we activate the RF link along with the FSO link when FSO link quality is unacceptable, and adaptively set RF transmission power to ensure constant combined signal-to-noise ratio at receiver terminal. Analytical expressions for the outage probability of the hybrid system with and without power adaptation are derived. Numerical examples show that, the hybrid FSO/RF systems with power adaptation achieve considerable outage performance improvement over conventional hybrid FSO/RF systems without power adaptation. © 2015 IEEE.

  6. Outage Probability versus Fairness Trade-off in Opportunistic Relay Selection with Outdated CSI

    Directory of Open Access Journals (Sweden)

    Vicario JoseLopez

    2009-01-01

    Full Text Available We analyze the existing trade-offs in terms of system performance versus fairness of a cooperative system based on opportunistic relay selection (ORS and with outdated channel state information (CSI. In particular, system performance is analytically evaluated in terms of outage probability, and the fairness behavior is assessed based on the power consumption at the different relays. In order to improve the fairness behavior of ORS while keeping the selection diversity gain, we propose a relay selection mechanism where the relay with the highest normalized signal-to-noise ratio (SNR is selected for relaying the source's information. The proposed strategy is compared with existing relay selection strategies by adopting a novel graphical representation inspired by expected profit versus risk plots used in modern portfolio theory. As shown in the paper, this strategy allows operating the system in more favorable points of the outage versus fairness region.

  7. Outage and Capacity Performance Evaluation of Distributed MIMO Systems over a Composite Fading Channel

    Directory of Open Access Journals (Sweden)

    Wenjie Peng

    2014-01-01

    Full Text Available The exact closed-form expressions regarding the outage probability and capacity of distributed MIMO (DMIMO systems over a composite fading channel are derived. This is achieved firstly by using a lognormal approximation to a gamma-lognormal distribution when a mobile station (MS in the cell is in a fixed position, and the so-called maximum ratio transmission/selected combining (MRT-SC and selected transmission/maximum ratio combining (ST-MRC schemes are adopted in uplink and downlink, respectively. Then, based on a newly proposed nonuniform MS cell distribution model, which is more consistent with the MS cell hotspot distribution in an actual communication environment, the average outage probability and capacity formulas are further derived. Finally, the accuracy of the approximation method and the rationality of the corresponding theoretical analysis regarding the system performance are proven and illustrated by computer simulations.

  8. Method for estimating power outages and restoration during natural and man-made events

    Science.gov (United States)

    Omitaomu, Olufemi A.; Fernandez, Steven J.

    2016-01-05

    A method of modeling electric supply and demand with a data processor in combination with a recordable medium, and for estimating spatial distribution of electric power outages and affected populations. A geographic area is divided into cells to form a matrix. Within the matrix, supply cells are identified as containing electric substations and demand cells are identified as including electricity customers. Demand cells of the matrix are associated with the supply cells as a function of the capacity of each of the supply cells and the proximity and/or electricity demand of each of the demand cells. The method includes estimating a power outage by applying disaster event prediction information to the matrix, and estimating power restoration using the supply and demand cell information of the matrix and standardized and historical restoration information.

  9. Recent Performance of and Plasma Outage Studies with the SNS H- Source

    Energy Technology Data Exchange (ETDEWEB)

    Stockli, Martin P [ORNL; Han, Baoxi [ORNL; Murray Jr, S N [ORNL; Pennisi, Terry R [ORNL; Piller, Chip [ORNL; Santana, Manuel [ORNL; Welton, Robert F [ORNL

    2016-01-01

    SNS ramps to higher power levels that can be sustained with high availability. The goal is 1.4 MW despite a compromised RFQ, which requires higher RF power than design levels to approach the nominal beam transmission. Unfortunately at higher power the RFQ often loses its thermal stability, a problem apparently enhanced by beam losses and high influxes of hydrogen. Delivering as much H- beam as possible with the least amount of hydrogen led to plasma outages. The root cause is the dense 1-ms long ~55-kW 2-MHz plasma pulses reflecting ~90% of the continuous ~300W, 13-MHz power, which was mitigated with a 4-ms filter for the reflected power signal and an outage resistant, slightly-detuned 13-MHz match. Lowering the H2 also increased the H- beam current to ~55 mA, and increased the transmission by ~7%.

  10. Exact closed form expressions for outage probability of GSC receivers over Rayleigh fading channel subject to self-interference

    KAUST Repository

    Nam, Sungsik; Hasna, Mazen Omar; Alouini, Mohamed-Slim

    2010-01-01

    in mind, we capitalize in this paper on some new order statistics results to derive exact closed-form expressions for outage probability of GSC RAKE receivers subject to self-interference over independent and identically distributed Rayleigh fading

  11. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    International Nuclear Information System (INIS)

    Gotcheva, N.; Macchi, L.; Oedewald, P.; Eitrheim, M.H.R.; Axelsson, C.; Reiman, T.; Pietikaeinen, E.

    2013-04-01

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  12. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    Energy Technology Data Exchange (ETDEWEB)

    Gotcheva, N.; Macchi, L.; Oedewald, P. [Technical Research Centre of Finland (VTT), Espoo (Finland); Eitrheim, M.H.R. [Institute for Energy Technology (IFE) (Norway); Axelsson, C.; Reiman, T.; Pietikaeinen, E. [Ringhals AB (NPP), Vattenfall AB (Sweden)

    2013-04-15

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  13. Shortened outage duration and increased safety with head assembly upgrade packages

    International Nuclear Information System (INIS)

    Leanne, M.; Lisien, P.E.; Plute, K.; Duran, J.

    2007-01-01

    To significantly reduce outage critical path duration and personnel radiation exposure, and to increase personnel safety, Westinghouse Electric Co., LLC has designed and installed upgrades to the existing head assemblies of operating pressurized water reactors. These upgrades are known as Head Assembly Upgrade Packages (HAUPs) or Simplified Head Assemblies (SHAs). Custom configurations are created from a set of standard elements to optimize the design for each unique containment, head assembly configuration, and licensing basis. Two primary options are available for implementation: a full HAUP or targeted component and system upgrades. Plants may achieve much of the outage savings, dose reduction, and safety improvements even with a more limited hardware scope. A range of improvements can be offered from integral missile shields, to redesigned duct work, radiation shields, and cable layout and connection optimization. The hardware changes are customized to target the scope that adds the most value for a given plant. While combining upgrades with a reactor vessel head (RVH) replacement adds some flexibility, it is not necessary. Some plants have chosen to implement targeted upgrades prior to a replacement RVH outage and then complete the remainder of the full HAUP during the replacement RVH outage. Three-dimensional computer aided design tools are used in the conceptual and detailed design phases to identify and avoid interferences between existing and replacement plant components. State-of-the-art computational fluid dynamics models for control drive mechanism (CDM) cooling systems are used to demonstrate the ability to maintain or improve the original design performance while greatly simplifying the disassembly/re-assembly activities. Likewise, state-of-the-art finite element analysis methods allow optimization of structural components while meeting code limits for design basis accident conditions. (authors)

  14. Worldwide OMEGA and Very Low Frequency (VLF) Transmitter Outages, January to December 1980.

    Science.gov (United States)

    1981-05-01

    WORLDWIDE OMEGA AND VERY LOW FREQUENCY IVLF) TRANSMITTER OUTAGE--ETC, MAY 81 L RZONCA ,’,L.ASSI LED FAA-CT-81-26 FAA-RD- B1 -29 UL7 A-I’ l15FDRL AIO...computer for the time period GBR - Rugby , England (16.00 kHz) January to December 1980. (For the purposes of this report, any downtime NA - Cutler, Maine

  15. Partner cooperation with decode-and-forward: Closed-form outage analysis and comparison

    KAUST Repository

    Benjillali, Mustapha

    2013-01-01

    In this paper, we investigate the outage performance of "partner cooperation" based on opportunistic Decodeand- Forward with constrained partial selection and reactive relaying strategies in dual-hop cooperative Nakagami-m fading links. The source/destination, which is based on the unique knowledge of local channel state information, selects the best relay to increase the chances of cooperation in both uplink and downlink communications when the direct link is also available. After deriving new expressions for the cumulative distribution functions of the variables of interest, the outage probability of the system is obtained in closed-form. We also derive the ε-outage capacity in different particular cases, and the obtained results - when the channel model is reduced to a Rayleigh fading - either are new or correspond to those previously obtained in other works. Simulation results confirm the accuracy of our analysis for a large selection of system and fading parameters and provide a new insight into the design and optimization of cooperative configurations. © 2012 IEEE.

  16. Outage Analysis of Mixed Underlay Cognitive RF MIMO and FSO Relaying with Interference Reduction

    KAUST Repository

    Al-Qahtani, Fawaz S.; El-Malek, Ahmed H. Abd; Ansari, Imran S.; Radaydeh, Redha Mahmoud Mesleh; Zummo, Salam A.

    2017-01-01

    In this paper, we study the outage performance of multiuser mixed underlay radio frequency (RF)/multidestinations free-space optical (FSO) links. For RF links, we consider a secondary network with multiple users that can communicate with multiple destinations through a relaying node. The relay is equipped with an antenna array at the RF side, and it uses the amplify-and-forward (AF) protocol. The primary users (PUs) are equipped with multiple antennas at transmit and receive nodes. The RF link is subjected to the aggregate PUs interference effect on the secondary network. To reduce the effect of PUs interference on secondary network at the relay node, two interference cancellation (IC) schemes are adopted, which vary in terms of complexity and achieved performance. On the other hand, the multidestination FSO links can be exploited to further enhance the quality of the second hop, and their associated channel models account for pointing errors, intensity modulation/direct detection, and heterodyne detection. For the aforementioned system model, we obtain exact and asymptotic closed-form expressions for the end-to-end outage probability. To further enhance system performance, optimal power allocation between the two hops is obtained based on the derived asymptotic outage probability expressions.

  17. A heuristic model for risk and cost impacts of plant outage maintenance schedule

    International Nuclear Information System (INIS)

    Mohammad Hadi Hadavi, S.

    2009-01-01

    Cost and risk are two major competing criteria in maintenance optimization problems. If a plant is forced to shutdown because of accident or fear of accident happening, beside loss of revenue, it causes damage to the credibility and reputation of the business operation. In this paper a heuristic model for incorporating three compelling optimization criteria (i.e., risk, cost, and loss) into a single evaluation function is proposed. Such a model could be used in any evaluation engine of outage maintenance schedule optimizer. It is attempted to make the model realistic and to address the ongoing challenges facing a schedule planner in a simple and commonly understandable fashion. Two simple competing schedules for the NPP feedwater system are examined against the model. The results show that while the model successfully addresses the current challenges for outage maintenance optimization, it properly demonstrates the dynamics of schedule in regards to risk, cost, and losses endured by maintenance schedule, particularly when prolonged outage and lack of maintenance for equipments in need of urgent care are of concern.

  18. Outage Analysis of Mixed Underlay Cognitive RF MIMO and FSO Relaying with Interference Reduction

    KAUST Repository

    Al-Qahtani, Fawaz S.

    2017-03-22

    In this paper, we study the outage performance of multiuser mixed underlay radio frequency (RF)/multidestinations free-space optical (FSO) links. For RF links, we consider a secondary network with multiple users that can communicate with multiple destinations through a relaying node. The relay is equipped with an antenna array at the RF side, and it uses the amplify-and-forward (AF) protocol. The primary users (PUs) are equipped with multiple antennas at transmit and receive nodes. The RF link is subjected to the aggregate PUs interference effect on the secondary network. To reduce the effect of PUs interference on secondary network at the relay node, two interference cancellation (IC) schemes are adopted, which vary in terms of complexity and achieved performance. On the other hand, the multidestination FSO links can be exploited to further enhance the quality of the second hop, and their associated channel models account for pointing errors, intensity modulation/direct detection, and heterodyne detection. For the aforementioned system model, we obtain exact and asymptotic closed-form expressions for the end-to-end outage probability. To further enhance system performance, optimal power allocation between the two hops is obtained based on the derived asymptotic outage probability expressions.

  19. A novel fusion methodology to bridge GPS outages for land vehicle positioning

    International Nuclear Information System (INIS)

    Chen, Wei; Li, Xu; Song, Xiang; Xu, Qimin; Li, Bin; Song, Xianghui

    2015-01-01

    Many intelligent transportation system applications require accurate, reliable, and continuous vehicle position information whether in open-sky environments or in Global Positioning System (GPS) denied environments. However, there remains a challenging task for land vehicles to achieve such positioning performance using low-cost sensors, especially microelectromechanical system (MEMS) sensors. In this paper, a novel and cost-effective fusion methodology to bridge GPS outages is proposed and applied in the Inertial Navigation System (INS)/GPS/ compass integrated positioning system. In the implementation of the proposed methodology, a key data preprocessing algorithm is first developed to eliminate the noise in inertial sensors in order to provide more accurate information for subsequent modeling. Then, a novel hybrid strategy incorporating the designed autoregressive model (AR model)-based forward estimator (ARFE) with Kalman filter (KF) is presented to predict the INS position errors during GPS outages. To verify the feasibility and effectiveness of the proposed methodology, real road tests with various scenarios were performed. The proposed methodology illustrates significant improvement in positioning accuracy during GPS outages. (paper)

  20. Outage Probability Analysis in Power-Beacon Assisted Energy Harvesting Cognitive Relay Wireless Networks

    Directory of Open Access Journals (Sweden)

    Ngoc Phuc Le

    2017-01-01

    Full Text Available We study the performance of the secondary relay system in a power-beacon (PB assisted energy harvesting cognitive relay wireless network. In our system model, a secondary source node and a relay node first harvest energy from distributed PBs. Then, the source node transmits its data to the destination node with the help of the relay node. Also, fading coefficients of the links from the PBs to the source node and relay node are assumed independent but not necessarily identically distributed (i.n.i.d Nakagami-m random variables. We derive exact expressions for the power outage probability and the channel outage probability. Based on that, we analyze the total outage probability of the secondary relay system. Asymptotic analysis is also performed, which provides insights into the system behavior. Moreover, we evaluate impacts of the primary network on the performance of the secondary network with respect to the tolerant interference threshold at the primary receiver as well as the interference introduced by the primary transmitter at the secondary source and relay nodes. Simulation results are provided to validate the analysis.

  1. Outage Analysis of Cooperative Transmission with Energy Harvesting Relay: Time Switching versus Power Splitting

    Directory of Open Access Journals (Sweden)

    Guanyao Du

    2015-01-01

    Full Text Available This paper investigates the multiuser transmission network with an energy harvesting (EH cooperative relay, where a source transmits independent information to multiple destinations with the help of an energy constrained relay. The relay can harvest energy from the radio frequency (RF signals transmitted from the source, and it helps the multiuser transmission only by consuming the harvested energy. By adopting the time switching and the power splitting relay receiver architectures, we firstly propose two protocols, the time switching cooperative multiuser transmission (TSCMT protocol and the power splitting cooperative multiuser transmission (PSCMT protocol, to enable the simultaneous information processing and EH at the relay for the system. To evaluate the system performance, we theoretically analyze the system outage probability for the two proposed protocols and then derive explicit expressions for each of them, respectively. Numerical results are provided to demonstrate the accuracy of our analytical results and reveal that compared with traditional noncooperative scheme our proposed protocols are green solutions to offer reliable communication and lower system outage probability without consuming additional energy. In particular, for the same transmit power at the source, the PSCMT protocol is superior to the TSCMT protocol to obtain lower system outage probability.

  2. Assessment and Application of the ROSE Code for Reactor Outage Thermal-Hydraulic and Safety Analysis

    International Nuclear Information System (INIS)

    Liang, Thomas K.S.; Ko, F.-K.; Dai, L.-C.

    2001-01-01

    The currently available tools, such as RELAP5, RETRAN, and others, cannot easily and correctly perform the task of analyzing the system behavior during plant outages. Therefore, a medium-sized program aiming at reactor outage simulation and evaluation, such as midloop operation (MLO) with loss of residual heat removal (RHR), has been developed. Important thermal-hydraulic processes involved during MLO with loss of RHR can be properly simulated by the newly developed reactor outage simulation and evaluation (ROSE) code. The two-region approach with a modified two-fluid model has been adopted to be the theoretical basis of the ROSE code.To verify the analytical model in the first step, posttest calculations against the integral midloop experiments with loss of RHR have been performed. The excellent simulation capacity of the ROSE code against the Institute of Nuclear Energy Research Integral System Test Facility test data is demonstrated. To further mature the ROSE code in simulating a full-sized pressurized water reactor, assessment against the WGOTHIC code and the Maanshan momentary-loss-of-RHR event has been undertaken. The successfully assessed ROSE code is then applied to evaluate the abnormal operation procedure (AOP) with loss of RHR during MLO (AOP 537.4) for the Maanshan plant. The ROSE code also has been successfully transplanted into the Maanshan training simulator to support operator training. How the simulator was upgraded by the ROSE code for MLO will be presented in the future

  3. Techno-Economic Evaluation of Technologies to Mitigate Greenhouse Gas Emissions at North American Refineries.

    Science.gov (United States)

    Motazedi, Kavan; Abella, Jessica P; Bergerson, Joule A

    2017-02-07

    A petroleum refinery model, Petroleum Refinery Life-cycle Inventory Model (PRELIM), that estimates energy use and CO 2 emissions was modified to evaluate the environmental and economic performance of a set of technologies to reduce CO 2 emissions at refineries. Cogeneration of heat and power (CHP), carbon capture at fluid catalytic cracker (FCC) and steam methane reformer (SMR) units, and alternative hydrogen production technologies were considered in the analysis. The results indicate that a 3-44% reduction in total annual refinery CO 2 emissions (2-24% reductions in the CO 2 emissions on a per barrel of crude oil processed) can be achieved in a medium conversion refinery that processes a typical U.S. crude slate obtained by using the technologies considered. A sensitivity analysis of the quality of input crude to a refinery, refinery configuration, and prices of natural gas and electricity revealed how the magnitude of possible CO 2 emissions reductions and the economic performance of the mitigation technologies can vary under different conditions. The analysis can help inform decision making related to investment decisions and CO 2 emissions policy in the refining sector.

  4. Combined analysis of job and task benzene air exposures among workers at four US refinery operations.

    Science.gov (United States)

    Burns, Amanda; Shin, Jennifer Mi; Unice, Ken M; Gaffney, Shannon H; Kreider, Marisa L; Gelatt, Richard H; Panko, Julie M

    2017-03-01

    Workplace air samples analyzed for benzene at four US refineries from 1976 to 2007 were pooled into a single dataset to characterize similarities and differences between job titles, tasks and refineries, and to provide a robust dataset for exposure reconstruction. Approximately 12,000 non-task (>180 min) personal samples associated with 50 job titles and 4000 task (job titles and task codes across all four refineries, and (5) our analysis of variance (ANOVA) of the distribution of benzene air concentrations for select jobs/tasks across all four refineries. The jobs and tasks most frequently sampled included those with highest potential contact with refinery product streams containing benzene, which reflected the targeted sampling approach utilized by the facility industrial hygienists. Task and non-task data were analyzed to identify and account for significant differences within job-area, task-job, and task-area categories. This analysis demonstrated that in general, areas with benzene containing process streams were associated with greater benzene air concentrations compared to areas with process streams containing little to no benzene. For several job titles and tasks analyzed, there was a statistically significant decrease in benzene air concentration after 1990. This study provides a job and task-focused analysis of occupational exposure to benzene during refinery operations, and it should be useful for reconstructing refinery workers' exposures to benzene over the past 30 years.

  5. Improvement of availability of PWR nuclear plants through the reduction of the time required for refueling/maintenance outages

    International Nuclear Information System (INIS)

    Mayers, J.B.; Soth, L.G.

    1978-04-01

    The objective of the project, conducted by Commonwealth Research Corporation and Westinghouse Electric Corporation, is to identify improvements in procedures and equipment which will reduce the time required for refueling/maintenance outages at PWR nuclear power plants. The outage of Commonwealth Edison Zion Station Unit 1 in March through May of 1976 was evaluated to identify those items which caused delays and those work activities that offer the potential for significant improvements that could reduce the overall duration of the outage and achieve an improvement in the plant's availability for power production. Modifications in procedures have been developed and were evaluated during one or more outages in 1977. Conceptual designs have been developed for equipment modifications to the refueling system that could reduce the time required for the refueling portion of the outage. The purpose of the interim report is to describe those conceptual designs and to assess their impact upon future outages. Recommendations are included for the implementation of these equipment improvements in a continuation of this program as a demonstration of plant availability benefits that can be realized in PWR nuclear plants already in operation or under construction

  6. Allowance Allocation and CO2 intensity of the EU15 and Norwegian refineries

    International Nuclear Information System (INIS)

    Nilsson, Kristina; Zetterberg, Lars; Aahman, Markus

    2005-02-01

    On 1 January 2005, the European Union Emission Trading Scheme (EU ETS) was launched. The launch has been preceded by an allocation process in each of the Member States. The main objective of this study was to analyse the allocation in relation to CO 2 efficiency for the mineral oil refining sector. A CO 2 intensity index for mineral oil refineries has been defined and calculated for the refineries within the EU15 and Norway. The IVL CO 2 intensity index is based both on the Solomon Energy Intensity Index (EII), an assumed fuel mix, and process-specific emissions. Due to uncertainties in input data, the determined values for the individual refineries are quite uncertain. However, the regional values can be used to identify trends. It was concluded that there are substantial differences in the CO 2 intensity between refineries within different regions/countries in the EU and these differences have not been considered in the allocation process. Only a few countries have mentioned energy efficiency or reduction potential due to CO 2 intensity of fuels used. Only one country (Denmark) has explicitly given a benchmark that will be used for allocation to new mineral oil refineries. The allocation has generally been based on historic emissions, which will result in refineries with historically higher emissions being allocated larger amounts than refineries with historically lower emissions. This might be favourable for refineries that recently have performed emission-reducing measures but might be less favourable for refineries that during a long time period have implemented emission-reducing measures

  7. Allowance Allocation and CO{sub 2} intensity of the EU15 and Norwegian refineries

    Energy Technology Data Exchange (ETDEWEB)

    Nilsson, Kristina; Zetterberg, Lars; Aahman, Markus

    2005-02-01

    On 1 January 2005, the European Union Emission Trading Scheme (EU ETS) was launched. The launch has been preceded by an allocation process in each of the Member States. The main objective of this study was to analyse the allocation in relation to CO{sub 2} efficiency for the mineral oil refining sector. A CO{sub 2} intensity index for mineral oil refineries has been defined and calculated for the refineries within the EU15 and Norway. The IVL CO{sub 2} intensity index is based both on the Solomon Energy Intensity Index (EII), an assumed fuel mix, and process-specific emissions. Due to uncertainties in input data, the determined values for the individual refineries are quite uncertain. However, the regional values can be used to identify trends. It was concluded that there are substantial differences in the CO{sub 2} intensity between refineries within different regions/countries in the EU and these differences have not been considered in the allocation process. Only a few countries have mentioned energy efficiency or reduction potential due to CO{sub 2} intensity of fuels used. Only one country (Denmark) has explicitly given a benchmark that will be used for allocation to new mineral oil refineries. The allocation has generally been based on historic emissions, which will result in refineries with historically higher emissions being allocated larger amounts than refineries with historically lower emissions. This might be favourable for refineries that recently have performed emission-reducing measures but might be less favourable for refineries that during a long time period have implemented emission-reducing measures.

  8. Characteristics of outage radiation fields around various reactor components

    International Nuclear Information System (INIS)

    Verzilov, Y.; Husain, A.; Corbin, G.

    2008-01-01

    Full text: Activity monitoring surveys, consisting of gamma spectroscopy and dose rate measurements, of various CANDU station components such as the reactor face, feeder cabinet, steam generators and moderator heat exchangers are often performed during shutdown in order to trend the transport of activity around the primary heat transport and moderator systems. Recently, the increased dose expenditure for work such as feeder inspection and replacement in the reactor vault has also spurred interest in improved characterization of the reactor face fields to facilitate better ALARA decision making and hence a reduction in future dose expenditures. At present, planning for reactor face work is hampered by insufficient understanding of the relative contribution of the various components to the overall dose. In addition to the increased dose expenditure for work at the reactor face, maintenance work associated with horizontal flux detectors and liquid injection systems has also resulted in elevated dose expenditures. For instance at Darlington, radiation fields in the vicinity of horizontal flux detectors (HFD) and Liquid Injection Shutdown System (LISS) nozzle bellows are trending upwards with present contact fields being in the range 16-70 rem/h and working distance fields being in the range 100-500 mrem/h. This paper presents findings based on work currently being funded by the CANDU Owners Group. Measurements were performed at Ontario Power Generation's Pickering and Darlington nuclear stations. Specifically, the following are addressed: Characteristics of Reactor Vault Fields; Characteristics of Steam Generator Fields; Characteristics of Moderator Heat Exchanger Fields. Measurements in the reactor vault were performed at the reactor face, along the length of end fittings, along the length of feeders, at the bleed condenser and at the HFD and LISS nozzle bellows. Steam generator fields were characterized at various elevations above the tube sheet, with and without the

  9. Carbon Capture and Sequestration from a Hydrogen Production Facility in an Oil Refinery

    Energy Technology Data Exchange (ETDEWEB)

    Engels, Cheryl; Williams, Bryan, Valluri, Kiranmal; Watwe, Ramchandra; Kumar, Ravi; Mehlman, Stewart

    2010-06-21

    The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE?s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities

  10. Corrosion resistance of high performance stainless steels in cooling water and other refinery environments

    International Nuclear Information System (INIS)

    Kovach, C.W.; Redmerski, L.S.

    1984-01-01

    The recent successful introduction of high performance stainless steels as tubing for seawater cooled electric utility condensers suggests that these alloys can also provide useful service in refinery heat exchanger applications. Since many of these applications involve higher temperature exposure than steam condensers, a study was conducted to evaluate crevice corrsion resistance over a range of cooling water temperature and chloride concentrations, and also to evaluate general corrosion resistance in some strong chemical and refinery environments. These stainless steels display excellent crevice corrosion resistance as well as good resistance to a variety of chemical environments that may be encountered in refinery, petrochemical and chemical plant service

  11. Multi objective multi refinery optimization with environmental and catastrophic failure effects objectives

    Science.gov (United States)

    Khogeer, Ahmed Sirag

    2005-11-01

    Petroleum refining is a capital-intensive business. With stringent environmental regulations on the processing industry and declining refining margins, political instability, increased risk of war and terrorist attacks in which refineries and fuel transportation grids may be targeted, higher pressures are exerted on refiners to optimize performance and find the best combination of feed and processes to produce salable products that meet stricter product specifications, while at the same time meeting refinery supply commitments and of course making profit. This is done through multi objective optimization. For corporate refining companies and at the national level, Intea-Refinery and Inter-Refinery optimization is the second step in optimizing the operation of the whole refining chain as a single system. Most refinery-wide optimization methods do not cover multiple objectives such as minimizing environmental impact, avoiding catastrophic failures, or enhancing product spec upgrade effects. This work starts by carrying out a refinery-wide, single objective optimization, and then moves to multi objective-single refinery optimization. The last step is multi objective-multi refinery optimization, the objectives of which are analysis of the effects of economic, environmental, product spec, strategic, and catastrophic failure. Simulation runs were carried out using both MATLAB and ASPEN PIMS utilizing nonlinear techniques to solve the optimization problem. The results addressed the need to debottleneck some refineries or transportation media in order to meet the demand for essential products under partial or total failure scenarios. They also addressed how importing some high spec products can help recover some of the losses and what is needed in order to accomplish this. In addition, the results showed nonlinear relations among local and global objectives for some refineries. The results demonstrate that refineries can have a local multi objective optimum that does not

  12. Aerobic degradation of petroleum refinery wastewater in sequential batch reactor.

    Science.gov (United States)

    Thakur, Chandrakant; Srivastava, Vimal C; Mall, Indra D

    2014-01-01

    The aim of the present work was to study the effect of various parameters affecting the treatment of raw petroleum refinery wastewater (PRW) having chemical oxygen demand (COD) of 350 mg L(-1) and total organic carbon (TOC) of 70 mg L(-1) in sequential batch reactor (SBR). Effect of hydraulic retention time (HRT) was studied in instantaneous fill condition. Maximum COD and TOC removal efficiencies were found to be 80% and 84%, respectively, for fill phase of 2 h and react phase of 2 h with fraction of SBR being filled with raw PRW in each cycle being 0.4. Effect of parameters was studied in terms of settling characteristic of treated slurry. Kinetics of treatment process has been studied. FTIR and UV-visible analysis of PRW before and after treatment have been performed so as to understand the degradation mechanism.

  13. Phenol oxidation of petrol refinery wastewater catalyzed by Laccase

    International Nuclear Information System (INIS)

    Vargas, Maria Carolina; Ramirez, Nubia E.

    2002-01-01

    Laccase has been obtained through two different production systems, the first using Pleurotus ostreatus in solid-state fermentation, the second one using Trametes versicolor in submerged culture. Different substrates (by products from yeast, flour and beverage industries) have been evaluated in both systems. Maximum laccase yield with Pleurotus ostreatus (25 u/ml) was obtained in a wheat bran medium. The maximum enzyme concentration level using Trametes versicolor (25 u/ml) was achieved in a submerged system, containing 10% vinasse, 4,5% wheat bran and 0,2% molasses per liter of waste. Culture filtrate extracted from Pleurotus ostreatus was used to remove phenol from wastewater. The enzymatic treatment is effective over a wide pH and temperature range. The Laccase treatment has been successfully used to dephenolize industrial petrol refinery wastewater. The advantage of Laccase dephenolization is that this enzyme uses molecular oxygen as an oxidant

  14. Cleaning up gasoline will increase refinery hydrogen demand

    International Nuclear Information System (INIS)

    Pretorius, E.B.; Muan, A.

    1992-01-01

    This paper reports that hydrogen needs will increase two to five times as the world turns its attention to cleaning up engine exhaust. The subject of fuel trends and hydrogen needs at Foster Wheeler USA Corp.'s Hydrogen Plant Conference, June 2--4, in Orlando was addressed. The conference was attended by more than 100 people from 12 different countries. Drawing on knowledge from over 1 billion scfd of total installed hydrogen plant capacity, Foster Wheeler experts presented papers in the fields of steam reforming, partial oxidation (with all feedstocks, from natural gas to resids and coal), and steam reformer design. Other industry specialists gave papers on refinery balances, markets, coal feedstocks, utility systems, and components for hydrogen plants

  15. BTEX biodegradation by bacteria from effluents of petroleum refinery.

    Science.gov (United States)

    Mazzeo, Dânia Elisa Christofoletti; Levy, Carlos Emílio; de Angelis, Dejanira de Franceschi; Marin-Morales, Maria Aparecida

    2010-09-15

    Groundwater contamination with benzene, toluene, ethylbenzene and xylene (BTEX) has been increasing, thus requiring an urgent development of methodologies that are able to remove or minimize the damages these compounds can cause to the environment. The biodegradation process using microorganisms has been regarded as an efficient technology to treat places contaminated with hydrocarbons, since they are able to biotransform and/or biodegrade target pollutants. To prove the efficiency of this process, besides chemical analysis, the use of biological assessments has been indicated. This work identified and selected BTEX-biodegrading microorganisms present in effluents from petroleum refinery, and evaluated the efficiency of microorganism biodegradation process for reducing genotoxic and mutagenic BTEX damage through two test-systems: Allium cepa and hepatoma tissue culture (HTC) cells. Five different non-biodegraded BTEX concentrations were evaluated in relation to biodegraded concentrations. The biodegradation process was performed in a BOD Trak Apparatus (HACH) for 20 days, using microorganisms pre-selected through enrichment. Although the biodegradation usually occurs by a consortium of different microorganisms, the consortium in this study was composed exclusively of five bacteria species and the bacteria Pseudomonas putida was held responsible for the BTEX biodegradation. The chemical analyses showed that BTEX was reduced in the biodegraded concentrations. The results obtained with genotoxicity assays, carried out with both A. cepa and HTC cells, showed that the biodegradation process was able to decrease the genotoxic damages of BTEX. By mutagenic tests, we observed a decrease in damage only to the A. cepa organism. Although no decrease in mutagenicity was observed for HTC cells, no increase of this effect after the biodegradation process was observed either. The application of pre-selected bacteria in biodegradation processes can represent a reliable and

  16. Solid waste management : a case study of National Refinery Limited

    Energy Technology Data Exchange (ETDEWEB)

    Syed, A.H.; Syed, Z.R. [National Refinery Ltd., Karachi (Pakistan); NED Univ. of Engineering and Technology, Karachi (Pakistan)

    2000-07-01

    A study was conducted to quantify and classify the waste generated at the National Refinery Limited (NRL). This refinery, located in Karachi, Pakistan, produces naphtha, motor gasoline, diesel, kerosene and lubricating oils and much more. Various units such as crude oil storage, thermal cracking, catalytic cracking and others were surveyed to assess the source and nature of the pollution. It was found that the major contributor to air pollution was the sulfur released through the burning of fuel oil during day-to-day operations. It was determined that approximately 2000 metric tons of solid waste were produced each day, along with 0.55 million gallons of waste water. In addition, sulfur, carbon dioxide, carbon monoxide and nitrogen dioxide were also released in the atmosphere. The solid waste was composed of municipal waste, sludges from the API and other discarded materials. The authors then proceeded to determine the heavy metals contents in samples obtained from combined sludge dumping areas on the premises. The sludges contained sulfur (0-1.26 wt per cent), lead (0-0.156 wt per cent), iron (0.01-3.4 wt per cent), chromium (0-0.159 per cent), copper (0-0.05 wt per cent), cadmium (0-0.0034 wt per cent), nickel (0-0.168 wt per cent), and manganese (0.0015-0.0776 wt per cent). It was recommended that hazardous and non-hazardous wastes be segregated, that a separate feasibility study be undertaken to determine the best possible course of action to dispose of solid waste, and that government guidelines be established on the same topic. 5 refs., 4 tabs.

  17. Colombia defines innovative plans for refining and petrochemicals

    International Nuclear Information System (INIS)

    Carta Petrolera

    1998-01-01

    Ecopetrol plans to increase capacity at its Cartagena refinery to 140,000 barrels per day until 2002. The new production will be for basic streams to supply and stimulate new industries in the petrochemical sector. Investment has concentrated on exploration and production and far less on the rest of the oil sector, but now Ecopetrol will be new financing plans to develop refining in keeping with government guidelines. The Ecopetrol Board approved the development plan for the Cartagena Refinery, this consist of increasing capacity

  18. Environmental performance of an innovative waste refinery based on enzymatic treatment

    DEFF Research Database (Denmark)

    Tonini, Davide; Astrup, Thomas

    2011-01-01

    for virgin material and saving fossil resources. In this paper a life-cycle assessment of a pilot-scale waste refinery for the enzymatic treatment of municipal solid waste (MSW) is presented. The refinery produced a liquid (liquefied organic materials and paper) and a solid fraction (non-degradable materials......Decrease of fossil fuel dependence and global warming mitigation has become increasingly important issues during the last decades. With respect to waste management higher recycling rates for valuable materials as well as energy recovery from waste streams could play a significant role substituting......) from the waste. The waste refinery was compared to alternative treatments such as incineration, bioreactor landfill and mechanical-biological treatment followed by utilization of the RDF (refuse-derived fuel) for energy. The performance of the waste refinery turned out to be comparable...

  19. More evidence of unpublished industry studies of lead smelter/refinery workers

    Science.gov (United States)

    2015-01-01

    Background Lead smelter/refinery workers in the US have had significant exposure to lead and are an important occupational group to study to understand the health effects of chronic lead exposure in adults. Recent research found evidence that studies of lead smelter/refinery workers have been conducted but not published. This paper presents further evidence for this contention. Objectives To present further evidence of industry conducted, unpublished epidemiologic studies of lead smelter/refinery workers and health outcomes. Methods Historical research relying on primary sources such as internal industry documents and published studies. Results ASARCO smelter/refinery workers were studied in the early 1980s and found to have increased risk of lung cancer and stroke in one study, but not in another. Conclusions Because occupational lead exposure is an on-going concern for US and overseas workers, all epidemiologic studies should be made available to evaluate and update occupational health and safety standards. PMID:26070220

  20. Inefficiency of Malaysian palm oil refineries and the impact of different factors on its inefficiency

    Directory of Open Access Journals (Sweden)

    Zahra Shahverdi

    2015-09-01

    Full Text Available This study aimed to analyze changes in the inefficiency of Malaysian palm oil refineries using DEA window analysis method over the period 1996 to 2009. We investigated the effects of different factors on inefficiency of Malaysian palm oil refineries. Based on empirical results, the effect of all factors such as vertical integration, types of ownership, foreign investment, location, experience, and liberalization on inefficiency of refineries was significant. Experience, liberalization, and joint venture between private and public sectors showed an increase in efficiency, while joint venture between local and foreign investment and vertical integration increased refineries’ inefficiency. However, palm oil refineries which were located in the states of Sabah and Sarawak were less technically inefficient than those located in peninsular Malaysia.

  1. Implication of coastal refineries to the ecology of the Gulf of Kachchh

    Digital Repository Service at National Institute of Oceanography (India)

    Zingde, M.D.; Anand, N.M.

    bank of the Gulf of Kachchh. An assessment of probable impact of establishment of these refineries to the rich biodiversity of the Gulf and suggestions to minimise these impacts have been made in this paper....

  2. Detection of impurities in fluid flowing in refinery pipeline or oil production operations using nuclear techniques

    International Nuclear Information System (INIS)

    1981-01-01

    Chlorine (from salt water) and sulphur are determined in crude oil in a well head conduit or refined product in a petroleum refinery by bombardment with neutrons and measuring the gamma rays emitted by neutron capture reactions. (U.K.)

  3. Treating refinery wastewaters in microbial fuel cells using separator electrode assembly or spaced electrode configurations

    KAUST Repository

    Zhang, Fang; Ahn, Yongtae; Logan, Bruce E.

    2014-01-01

    The effectiveness of refinery wastewater (RW) treatment using air-cathode, microbial fuel cells (MFCs) was examined relative to previous tests based on completely anaerobic microbial electrolysis cells (MECs). MFCs were configured with separator

  4. Reuse of refinery's tertiary-treated wastewater in cooling towers: microbiological monitoring.

    Science.gov (United States)

    Dos Santos, Vera Lúcia; Veiga, Andréa Azevedo; Mendonça, Rafael Silva; Alves, Andrea Lima; Pagnin, Sérgio; Santiago, Vânia M J

    2015-02-01

    The study was planned to quantify the distribution of bacteria between bulk water and biofilm formed on different materials in an industrial scale cooling tower system of an oil refinery operating with clarified and chlorinated freshwater (CCW) or chlorinated tertiary effluent (TRW) as makeup water. The sessile and planktonic heterotrophic bacteria and Pseudomonas aeruginosa densities were significantly higher in the cooling tower supplied with clarified and chlorinated freshwater (CTCW) (p towers, the biofilm density was higher on the surface of glass slides and stainless steel coupons than on the surface of carbon steel coupons. The average corrosion rates of carbon steel coupons (0.4-0.8 millimeters per year (mpy)) and densities of sessile (12-1.47 × 10(3) colony-forming unit (CFU) cm(-1)) and planktonic (0-2.36 × 10(3) CFU mL(-1)) microbiota remained below of the maximum values of reference used by water treatment companies as indicative of efficient microbial control. These data indicate that the strategies of the water treatment station (WTS) (free chlorine) and industrial wastewater treatment station (IWTS) followed by reverse electrodialysis system (RES) (free chlorine plus chloramine) were effective for the microbiological control of the two makeup water sources.

  5. Chemical composition of individual aerosol particles from working areas in a nickel refinery.

    Science.gov (United States)

    Höflich, B L; Wentzel, M; Ortner, H M; Weinbruch, S; Skogstad, A; Hetland, S; Thomassen, Y; Chaschin, V P; Nieboer, E

    2000-06-01

    Individual aerosol particles (n = 1170) collected at work stations in a nickel refinery were analyzed by wavelength-dispersive electron-probe microanalysis. By placing arbitrary restrictions on the contents of sulfur and silicon, the particles could be divided into four main groups. Scanning electron images indicated that most of the particles examined were relatively small (refinery intermediates. The implications of the findings for aerosol speciation measurements, toxicological studies and interpretation of adverse health effects are explored.

  6. Analysis of standard and innovative methods for allocating upstream and refinery GHG emissions to oil products

    International Nuclear Information System (INIS)

    Moretti, Christian; Moro, Alberto; Edwards, Robert; Rocco, Matteo Vincenzo; Colombo, Emanuela

    2017-01-01

    Highlights: •Traditional and innovative methods for allocating emissions at refinery level are reviewed. •Added value has been introduced as a novel allocation method. •Hydrogen-based consistency test has been introduced to validate the allocation methods. •Consistent allocation methods assign negative refinery emissions to heavy products. -- Abstract: Alternative fuel policies need accurate and transparent methods to find the embedded carbon intensity of individual refinery products. This study investigates different ways of allocating greenhouse gases emissions deriving from refining and upstream crude oil supply. Allocation methods based on mass, energy content, economic value and, innovatively, added-value, are compared with the marginal refining emissions calculated by CONCAWE’s linear-programming model to the average EU refinery, which has been adopted as reference in EU legislation. Beside the most important transportation fuels (gasoline, diesel, kerosene/jet fuel and heavy fuel oil), the analysis extends to petroleum coke and refinery hydrogen. Moreover, novel criteria, based on the implications due to hydrogen usage by each fuel pathway, have been introduced to test the consistency of the analyzed approaches. It is found that only two economic-based allocation methods are consistent with the introduced criteria. These two methods also give negative refinery emissions for heavy products, which is coherent with the marginal emissions calculated through the CONCAWE refinery model. The recommended allocation methods are transparent and use only publicly available statistical data, so they may be useful not only for future EU legislation, but also in jurisdictions where a representative refinery model is not available.

  7. Material resources, energy, and nutrient recovery from waste: are waste refineries the solution for the future?

    DEFF Research Database (Denmark)

    Tonini, Davide; Martinez-Sanchez, Veronica; Astrup, Thomas Fruergaard

    2013-01-01

    Waste refineries focusing on multiple outputs of material resources, energy carriers, and nutrients may potentially provide more sustainable utilization of waste resources than traditional waste technologies. This consequential life cycle assessment (LCA) evaluated the environmental performance....... Overall, the waste refinery provided global warming (GW) savings comparable with efficient incineration, MBT, and bioreactor landfilling technologies. The main environmental benefits from waste refining were a potential for improved phosphorus recovery (about 85%) and increased electricity production (by...

  8. The energy efficiency of crude oil refining in Brazil: A Brazilian refinery plant case

    International Nuclear Information System (INIS)

    Lima, Romulo S. de; Schaeffer, Roberto

    2011-01-01

    This article evaluates energy efficiency in Brazilian crude oil refining in comparison with the crude oil refining in the United States between 1930 and 2008. It aims to show that increased refinery complexity reduces the energy consumption of products of high value added. Moreover, the article shows that improvements in energy efficiency result in higher quality products and increased processing of oil. A Brazilian refinery with a capacity of 157,000 barrels per day (kbpd) was modernized in 2008 at a cost of US $1.3 billion. As a result, its capacity increased by 17%, from 157 to 189 kbpd. Its complexity index also rose from 3.2 to 6.8, allowing an improvement in the EII (energy intensity index) from 110% to 93%. In relation to the crude oil processed before being modernized, energy consumption fell from 0.75 to 0.52 MBtu (million British thermal units) per barrel processed. These proceedings show that increases in complexity reduce the energy consumed in the production of final products with high value added, such as gasoline, diesel and jet fuel. -- Highlights: → Increased refinery complexity reduces the energy consumption of products of high value added. → Improvements in refinery energy efficiency result in higher quality products and increased processing of oil. → Brazilian refineries were not affected significantly in the 2008 crisis, such as the US refineries, due to many factors. → The EII of Brazilian refining presents real opportunities for gains through changes in the profile of energy consumed.

  9. Petroleum Refinery Jobs and Economic Development Impact (JEDI) Model User Reference Guide

    Energy Technology Data Exchange (ETDEWEB)

    Goldberg, Marshall [MRG and Associates, Nevada City, CA (United States)

    2013-12-31

    The Jobs and Economic Development Impact (JEDI) models, developed through the National Renewable Energy Laboratory (NREL), are user-friendly tools utilized to estimate the economic impacts at the local level of constructing and operating fuel and power generation projects for a range of conventional and renewable energy technologies. The JEDI Petroleum Refinery Model User Reference Guide was developed to assist users in employing and understanding the model. This guide provides information on the model's underlying methodology, as well as the parameters and references used to develop the cost data utilized in the model. This guide also provides basic instruction on model add-in features, operation of the model, and a discussion of how the results should be interpreted. Based on project-specific inputs from the user, the model estimates job creation, earning and output (total economic activity) for a given petroleum refinery. This includes the direct, indirect and induced economic impacts to the local economy associated with the refinery's construction and operation phases. Project cost and job data used in the model are derived from the most current cost estimations available. Local direct and indirect economic impacts are estimated using economic multipliers derived from IMPLAN software. By determining the regional economic impacts and job creation for a proposed refinery, the JEDI Petroleum Refinery model can be used to field questions about the added value refineries may bring to the local community.

  10. Opportunities and challenges at the interface between petrochemistry and refinery. The BASF perspective

    Energy Technology Data Exchange (ETDEWEB)

    Blankertz, H.J. [BASF AG, Ludwigshafen (Germany)

    2007-07-01

    The author of the contribution under consideration reports on the BASF perspective according to opportunities and challenges at the interface between petrochemistry and refinery. This contribution is divided into the following chapters: (a) Overview BASF-Group; (b) Overview BASF Petrochemicals; (c) The refinery-chemistry interface; (d) Main focus refineries; (e) Interface challenges and opportunities; (f) What can BASF do for refineries. BASF employs the Verbund concept, a system that combines production with energy needs in an intelligent way. The idea is to reduce of primary energy carriers both in terms of raw materials and for power and steam generation. The authors describes the petrochemicals of BASF AG (Ludwigshafen, Federal Republic of Germany), the raw material development, evolution of thermal steamcracking and crackerproducts. Major feedstock source of the European petrochemical industry are streams out of refineries which can't be used for transportation fuels. The gap between propylene demand and production out of steam crackers has to be closed by propylene out for FCC's. Demand for aromatics (xylenes and benzene, and to a lesser extent toluene) needs to be filled in by aromatics out of refineries. Market drivers for the refining industry are lowering crude costs, growing clean products, increasing capacity and enhancing E and P integration. BASF has various business with the oil und refining industry and provides solutions for oil field chemicals, process chemicals and performance additives. The author explains which kind of products and services BASF provides for refiners.

  11. Outage performance of two-way DF relaying systems with a new relay selection metric

    KAUST Repository

    Hyadi, Amal

    2012-04-01

    This paper investigates a new constrained relay selection scheme for two-way relaying systems where two end terminals communicate simultaneously via a relay. The introduced technique is based on the maximization of the weighted sum rate of both users. To evaluate the performance of the proposed system, the outage probability is derived in a general case (where an arbitrary channel is considered), and then over independently but not necessarily identically distributed (i.n.i.d.) Rayleigh fading channels. The analytical results are verified through simulations. © 2012 IEEE.

  12. Outage and BER analysis for ultrawideband-based WPAN in Nakagami-m fading channels

    KAUST Repository

    Mehbodniya, Abolfazl

    2011-09-01

    This paper presents a performance analysis of multiband orthogonal frequency-division multiplexing (MB-OFDM) in ultra wideband (UWB)-based personal area networks (UPANs). A UPAN consists of devices with different UWB technologies at the physical layer. Approximate expressions for the outage probability and average bit error rate (BER) are derived in closed form for the MB-OFDM target receiver, taking into account multi-user interference (MUI), as well as external interference in the form of time-hopping (TH) and direct-sequence (DS) UWB signals. © 2010 IEEE.

  13. A study on assessment methodology of surveillance test interval and allowed outage time

    International Nuclear Information System (INIS)

    Che, Moo Seong; Cheong, Chang Hyeon; Lee, Byeong Cheol

    1996-07-01

    The objectives of this study is the development of methodology by which assessing the optimizes Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korea nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches is performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method

  14. Exact outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel; Yang, Hongchuan; Alouini, Mohamed-Slim

    2010-01-01

    In this paper, we investigate a dual-hop decode-andforward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. In our study, we derive exact closed-form expression for the outage probability based on the exact statistics of each hop. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2010 IEEE.

  15. Exact outage analysis of incremental decode-and-forward opportunistic relaying

    KAUST Repository

    Tourki, Kamel

    2010-11-01

    In this paper, we investigate a dual-hop decode-andforward opportunistic relaying scheme where the selected relay chooses to cooperate only if the source-destination channel is of an unacceptable quality. In our study, we derive exact closed-form expression for the outage probability based on the exact statistics of each hop. Furthermore, we perform asymptotic analysis and we deduce the diversity order of the scheme. We validate our analysis by showing that performance simulation results coincide with our analytical results over different network architectures. © 2010 IEEE.

  16. Efficient Outage Probability Evaluation of Diversity Receivers Over Generalized Gamma Channels

    KAUST Repository

    Ben Issaid, Chaouki; Alouini, Mohamed-Slim; Tempone, Raul

    2016-01-01

    In this paper, we are interested in determining the cumulative distribution function of the sum of generalized Gamma in the setting of rare event simulations. To this end, we present an efficient importance sampling estimator. The main result of this work is the bounded relative property of the proposed estimator. This result is used to accurately estimate the outage probability of multibranch maximum ratio combining and equal gain combining diversity receivers over generalized Gamma fading channels. Selected numerical simulations are discussed to show the robustness of our estimator compared to naive Monte Carlo.

  17. A study on assessment methodology of surveillance test interval and allowed outage time

    Energy Technology Data Exchange (ETDEWEB)

    Che, Moo Seong; Cheong, Chang Hyeon; Lee, Byeong Cheol [Seoul Nationl Univ., Seoul (Korea, Republic of)] (and others)

    1996-07-15

    The objectives of this study is the development of methodology by which assessing the optimizes Surveillance Test Interval(STI) and Allowed Outage Time(AOT) using PSA method that can supplement the current deterministic methods and the improvement of Korea nuclear power plants safety. In the first year of this study, the survey about the assessment methodologies, modeling and results performed by domestic and international researches is performed as the basic step before developing the assessment methodology of this study. The assessment methodology that supplement the revealed problems in many other studies is presented and the application of new methodology into the example system assures the feasibility of this method.

  18. Efficient Outage Probability Evaluation of Diversity Receivers Over Generalized Gamma Channels

    KAUST Repository

    Ben Issaid, Chaouki

    2016-10-01

    In this paper, we are interested in determining the cumulative distribution function of the sum of generalized Gamma in the setting of rare event simulations. To this end, we present an efficient importance sampling estimator. The main result of this work is the bounded relative property of the proposed estimator. This result is used to accurately estimate the outage probability of multibranch maximum ratio combining and equal gain combining diversity receivers over generalized Gamma fading channels. Selected numerical simulations are discussed to show the robustness of our estimator compared to naive Monte Carlo.

  19. An Internet of Things Approach to Electrical Power Monitoring and Outage Reporting

    Energy Technology Data Exchange (ETDEWEB)

    Koch, Daniel B [ORNL

    2017-01-01

    The so-called Internet of Things concept has captured much attention recently as ordinary devices are connected to the Internet for monitoring and control purposes. One enabling technology is the proliferation of low-cost, single board computers with built-in network interfaces. Some of these are capable of hosting full-fledged operating systems that provide rich programming environments. Taken together, these features enable inexpensive solutions for even traditional tasks such as the one presented here for electrical power monitoring and outage reporting.

  20. Outage and ser performance of an opportunistic multi-user underlay cognitive network

    KAUST Repository

    Khan, Fahd Ahmed

    2012-10-01

    Consider a multi-user underlay cognitive network where multiple cognitive users concurrently share the spectrum with a primary network and a single secondary user is selected for transmission. The channel is assumed to have independent but not identical Nakagami-m fading. Closed form expressions for the outage performance and the symbol-error-rate performance of the opportunistic multi-user secondary network are derived when a peak interference power constraint is imposed on the secondary network in addition to the limited peak transmit power of each secondary user. © 2012 IEEE.

  1. Psychosocial work strain of maintenance personnel during annual outage and normal operation in a nuclear power plant

    International Nuclear Information System (INIS)

    Jacobsson, L.; Svensson, O.

    1991-01-01

    This paper reports on a study which evaluates psychosocial work demands during the annual outage for a maintenance work group in a nuclear power plant. The study is based on a stress paradigm and it has been asserted that increased work strain would have a negative effect on performance. Nineteen workers, aged 20-55 years, participated in the study. The subjects filled out a questionnaire comparing work strain during annual outage and normal operation. During the outage period a 3-shift 24-hour work schedule, including nightwork, was used (working hours during normal operation was 7-16). Increased demands on concentration and vigilance, increased time pressure and strain on social relations within the group were found to characterize work during annual outage. Interestingly, for specific work tasks an association was found between the risk of making errors and high psychological workload. Increased work strain, shiftwork including nightwork and reduced social support are important psychosocial risk factors that might contribute to human error during the outage period

  2. Outage probability analysis of a secondary user in an underlay dual hop cognitive amplify and forward relay network

    Directory of Open Access Journals (Sweden)

    Kiran Chandra

    2016-09-01

    Full Text Available This paper presents the performance evaluation of a secondary user (SU in an underlay cognitive dual-hop relaying system considering instantaneous as well as average channel information of the interfering links (from the secondary source and relay to the primary receiver and the data link from the secondary source to relay, to calculate transmit power and amplifying gain of secondary system. Comparison of above mentioned cases is done for two different scenarios – with direct path and without direct path. We evaluate the performance considering two different diversity techniques namely as selection combining (SC and maximum ratio combining (MRC. The effect of different fading channels (Rayleigh and Nakagami on the outage performance of the SU for the two diversity techniques is also shown. The outage probability of the SU is reduced when the diversity techniques are used (with direct path as compared to the outage probability of SU without direct path. We find that the outage performance is better for instantaneous channel information as compared to average channel information for the links. We observe that MRC provides better performance than SC. Furthermore, this work shows that the outage performance of the SU has been improved when the Nakagami fading channel (m = 2 is considered instead of Rayleigh fading channel.

  3. Economic costs of electrical system instability and power outages caused by snakes on the Island of Guam

    Science.gov (United States)

    Fritts, T.H.

    2002-01-01

    The Brown Tree Snake, Boiga irregularis, is an introduced species on Guam where it causes frequent electrical power outages. The snake's high abundance, its propensity for climbing, and use of disturbed habitats all contribute to interruption of Guam's electrical service and the activities that depend on electrical power. Snakes have caused more than 1600 power outages in the 20-yr period of 1978–1997 and most recently nearly 200 outages per year. Single outages spanning the entire island and lasting 8 or more hours are estimated to cost in excess of $3,000,000 in lost productivity, but the costs of outages that involve only parts of the island or those of shorter durations are more difficult to quantify. Costs to the island's economy have exceeded $4.5 M $4.5M"> per year over a 7-yr period without considering repair costs, damage to electrical equipment, and lost revenues. Snakes pose the greatest problem on high voltage transmission lines, on transformers, and inside electrical substations.

  4. Risk-based assessment of the allowable outage times for the unit 1 leningrad nuclear power plant ECCS components

    International Nuclear Information System (INIS)

    Koukhar, Sergey; Vinnikov, Bronislav

    2009-01-01

    Present paper describes a method for risk - informed assessment of the Allowable Outage Times (AOTs). The AOT is the time, when components of a safety system allowed to be out of service during power operation or during shutdown operation off a plant. If the components are not restored during the time, the plant in operation must be shut down or the plant in a given shutdown mode has to go to safer shutdown mode. Application of the method is also provided for the equipment of the Unit 1 Leningrad NPP ECCS components. For solution of the problem it is necessary to carry out two series of computations using a Living PSA model, level 1. In the first series of the computations the core damage frequency (CDFb) for the base configuration of the plant is determined (there is no equipment out of service). Here the symbol 'b' means the base configuration of a plant. In the second series of the computations the core damage frequency (CDFi) for the configuration of the plant with the component (which is out of service) is calculated. That is here CDFi is determined for the failure probability of the component equal to 1.0 (component 'i' is unavailable). Then it is necessary to determine so called Risk Increase Factor (RIF) using the following ratio: RIFi = CDFi / CDFb. At last the AOT is calculated with the help of the ratio: AOTi = Tppr / RIFi, where Tppr is a period of time between two Planned Preventive Repairs (PPRs). 1. Using the risk based approach the AOTs were calculated for a set of the components of the Unit 1 Leningrad NPP ECCS components. 2. The main conclusion from the analysis is that the current deterministic AOTs for the ECCS components are conservative and should be extended. 3. The risk based extension of the AOTs for the ECCS components can prevent the Unit 1 Leningrad NPP to enter into the operating modes with increased risk. (author)

  5. Yields from pyrolysis of refinery residue using a batch process

    Directory of Open Access Journals (Sweden)

    S. Prithiraj

    2017-12-01

    Full Text Available Batch pyrolysis was a valuable process of assessing the potential of recovering and characterising products from hazardous waste materials. This research explored the pyrolysis of hydrocarbon-rich refinery residue, from crude oil processes, in a 1200 L electrically-heated batch retort. Furthermore, the off-gases produced were easily processed in compliance with existing regulatory emission standards. The methodology offers a novel, cost-effective and environmentally compliant method of assessing recovery potential of valuable products. The pyrolysis experiments yielded significant oil (70% with high calorific value (40 MJ/kg, char (14% with carbon content over 80% and non-condensable gas (6% with significant calorific value (240 kJ/mol. The final gas stream was subjected to an oxidative clean-up process with continuous on-line monitoring demonstrating compliance with South African emission standards. The gas treatment was overall economically optimal as only a smaller portion of the original residue was subjected to emission-controlling steps. Keywords: Batch pyrolysis, Volatiles, Oil yields, Char, Emissions, Oil recovery

  6. Optimization of refinery product blending by using linear programming

    International Nuclear Information System (INIS)

    Ristikj, Julija; Tripcheva-Trajkovska, Loreta; Rikaloski, Ice; Markovska, Liljana

    1999-01-01

    The product slate of a simple refinery consists mainly of liquefied petroleum gas, leaded and unleaded gasoline, jet fuel, diesel fuel, extra light heating oil and fuel oil. The quality of the oil products (fuels) for sale has to comply with the adopted standards for liquid fuels, and the produced quantities have to be comply with the market needs. The oil products are manufactured by blending two or more different fractions which quantities and physical-chemical properties depend on the crude oil type, the way and conditions of processing, and at the same time the fractions are used to blend one or more products. It is in producer's interest to do the blending in an optimal way, namely, to satisfy the requirements for the oil products quality and quantity with a maximal usage of the available fractions and, of course, with a maximal profit out of the sold products. This could be accomplished by applying linear programming, that is by using a linear model for oil products blending optimization. (Author)

  7. Purification and detoxification of petroleum refinery wastewater by electrocoagulation process.

    Science.gov (United States)

    Gousmi, N; Sahmi, A; Li, H Z; Poncin, S; Djebbar, R; Bensadok, K

    2016-09-01

    The treatment of synthetic oily wastewater having the characteristics of a typical petroleum refinery wastewater (PRW) by electrocoagulation (EC) using iron and aluminum electrodes was conducted in an electrolytic reactor equipped with fluid recirculation. During the treatment, the emulsion stability was followed by the measurement of Zeta potential and particle sizes. Effects of some operating conditions such as electrodes material, current density and electrolysis time on removal efficiencies of turbidity, and chemical oxygen demand (COD) were investigated in detail. The PRW purification by the EC process was found to be the most effective using aluminum as the anode and cathode, current density of 60 A/m(2) and 30 min of electrolysis time. Under these conditions, the process efficiencies were 83.52% and 99.94%, respectively, for COD and turbidity removals which correspond to final values of 96 mg O2/L and 0.5 NTU. A moderate energy consumption (0.341 kWh) was needed to treat 1 m(3) of PRW. Besides, the ecotoxicity test proved that toxic substances presented in the PRW, and those inhibiting the germination growth of whet, were eliminated by the EC technique.

  8. Commissioning and startup of the Blind River uranium refinery

    International Nuclear Information System (INIS)

    Schisler, J.M.

    1987-01-01

    In the last five years Eldorado Resources Ltd. (ERL) has undergone a major expansion and modernization of its uranium refining and conversion plants. A new refinery for processing yellow cake to UO/sub 3/ was constructed at Blind River in northern Ontario and started up in 1983. Its rated capacity is 18,000 t/a uranium as UO/sub 3/. At Port Hope, Ontario, ERL's new UF/sub 6/ conversion plant has been constructed. This plant started up in 1984. It utilizes the novel, wet-way process to produce UF/sub 4/ and gives the company a UF/sub 6/ production capacity of 14,500 t/a U. Also at Port Hope is Eldorado's ceramic UO/sub 2/ powder production facility, commissioned in late 1980. It has a capacity of 1700 t/a uranium as UO/sub 2/. With the completion of these capital projects, Eldorado has the largest and most up-to-date refining and conversion facilities in the western world. This paper reviews the refining process and process design. The methodology used to start up the Blind River plant is described as are some startup difficulties, solutions that were developed, and the resultant current operation

  9. Evaluation of wastewater treatment plant at Khartoum refinery company

    International Nuclear Information System (INIS)

    Alnour, Y. A. M.

    2010-03-01

    A wastewater treatment plant has been established in Khartoum Refinery Company in order to treat 1800 meters cubic per day, and to meet the increase in the number of employees and the continued expansion of the company. The study aims to evaluate the performance of the station after a three years period of work, and calculate the efficiency of the station through the following variables: average removal of the biological oxygen demand, chemical oxygen demand, suspended solids and oils, by taking water samples before and after treatment, every week for two month, analysis of samples were conducted in the central laboratory at KRC. The determination of the station efficiency revealed that the station is working well. Treated water characteristics are in conformity with the specifications set by the world Organization Health. It is also proved to be suitable for use in irrigation the amount of water entering to treatment is very large (1500 cubic meters), which lead to dilution of the BOD, COD, SS and oils concentrations. The reason being misuse of water by employees in addition to the large number of damage in the water pipes. The station must be re-evaluated after a certain (5 years) period to determine the impact of future increases of employees, and it is effect on the efficiency of the station. It is recommended to improve the behaviour of employees regarding the use of water, so as to reduce the dilution. (Author)

  10. Regeneration and reuse waste from an edible oil refinery.

    Science.gov (United States)

    Boukerroui, Abdelhamid; Belhocine, Lydia; Ferroudj, Sonia

    2017-08-21

    A spent bleaching earth (SBE) from an edible oil refinery has been regenerated by thermal processing in oven, followed by washing with a cold solution of hydrochloric acid (1M). Optimal regeneration conditions have been controlled by decolorization tests of degummed and neutralized soybean oil. Optimal values of treatment (temperature 350°C, carbonization time 01 h, and HCl concentration 1M) gave a very efficient material. After bleaching oil by regenerated spent bleaching earth (RSBE), the chlorophyll-a and β-carotenes contained in crude edible oil and observed respectively at 430, 454, and 483 nm, value of λ max , are very much decreased. The results obtained after decolorization of edible oil by RSBE material indicate, that, during the process, the bleaching oil did not undergo any changes in the free fatty acid content. The peroxide value (PV) was reduced from 4.2 to 1.8 meq O 2 /kg, and the color has been improved (Lovibond color yellow/red: from 50/0.5 to 2.7/0.3, respectively). The RSBE material obtained was characterized by several techniques (FTIR, SEM). The results show that the heat treatment did not affect the mineral structure of RSBE, and the regenerated material recovered its porous structure.

  11. Treatment of petroleum refinery sourwater by advanced oxidation processes

    International Nuclear Information System (INIS)

    Coelho, Alessandra; Castro, Antonio V.; Dezotti, Marcia; Sant'Anna, G.L.

    2006-01-01

    The performance of several oxidation processes to remove organic pollutants from sourwater was investigated. Sourwater is a specific stream of petroleum refineries, which contains slowly biodegradable compounds and toxic substances that impair the industrial biological wastewater treatment system. Preliminary experiments were conducted, using the following processes: H 2 O 2 , H 2 O 2 /UV, UV, photocatalysis, ozonation, Fenton and photo-Fenton. All processes, except Fenton and photo-Fenton, did not lead to satisfactory results, reducing at most 35% of the sourwater dissolved organic carbon (DOC). Thus, further experiments were performed with these two techniques to evaluate process conditions and organic matter removal kinetics. Batch experiments revealed that the Fenton reaction is very fast and reaches, in a few minutes, an ultimate DOC removal of 13-27%, due to the formation of iron complexes. Radiation for an additional period of 60 min can increase DOC removal up to 87%. Experiments were also conducted in a continuous mode, operating one 0.4 L Fenton stirred reactor and one 1.6 L photo-Fenton reactor in series. DOC removals above 75% were reached, when the reaction system was operated with hydraulic retention times (HRT) higher than 85 min. An empirical mathematical model was proposed to represent the DOC removal kinetics, allowing predicting process performance quite satisfactorily

  12. Outage performance of opportunistic two-way amplify-and-forward relaying with outdated channel state information

    KAUST Repository

    Hwang, Kyusung

    2013-09-01

    In this paper, we study the outage performance of an amplify-and-forward (AF)-based two-way relaying (TWR) system with multiple relays where a single relay selection is performed based on outdated channel state information (CSI). Specifically, we propose a single relay selection scheme in AF-based TWR system under outdated CSI conditions. With this policy, we offer a statistical analysis of the signal-to-noise ratio per hop and analyze the outage probability with asymmetric outage thresholds based on CSI-assisted AF protocol. Additionally, we provide the exact and asymptotic expressions based on the provided statistical/joint statistical analyses of a dual-hop AF transmission. Finally, we verify our analytical results with some selected computer-based simulation results. © 1972-2012 IEEE.

  13. Performance Analysis of Secrecy Outage Probability for AF-Based Partial Relay Selection with Outdated Channel Estimates

    Directory of Open Access Journals (Sweden)

    Kyu-Sung Hwang

    2017-01-01

    Full Text Available We study the secrecy outage probability of the amplify-and-forward (AF relaying protocol, which consists of one source, one destination, multiple relays, and multiple eavesdroppers. In this system, the aim is to transmit the confidential messages from a source to a destination via the selected relay in presence of eavesdroppers. Moreover, partial relay selection scheme is utilized for relay selection based on outdated channel state information where only neighboring channel information (source-relays is available and passive eavesdroppers are considered where a transmitter does not have any knowledge of eavesdroppers’ channels. Specifically, we offer the exact secrecy outage probability of the proposed system in a one-integral form as well as providing the asymptotic secrecy outage probability in a closed-form. Numerical examples are given to verify our provided analytical results for different system conditions.

  14. Outage probability of dual-hop partial relay selection with feedback delay in the presence of interference

    KAUST Repository

    Al-Qahtani, Fawaz S.

    2011-09-01

    In this paper, we investigate the outage performance of a dual-hop relaying systems with partial relay selection and feedback delay. The analysis considers the case of Rayleigh fading channels when the relaying station as well as the destination undergo mutually independent interfering signals. Particularly, we derive the cumulative distribution function (c.d.f.) of a new type of random variable involving sum of multiple independent exponential random variables, based on which, we present closed-form expressions for the exact outage probability of a fixed amplify-and-forward (AF) and decode-and-forward (DF) relaying protocols. Numerical results are provided to illustrate the joint effect of the delayed feedback and co-channel interference on the outage probability. © 2011 IEEE.

  15. Fundamental Limits of Parallel Optical Wireless Channels: Capacity Results and Outage Formulation

    KAUST Repository

    Chaaban, Anas; Rezki, Zouheir; Alouini, Mohamed-Slim

    2016-01-01

    Multi-channel (MC) optical wireless communication (OWC) systems employing wave-division multiplexing for outdoors free-space optical communications, or multi-user timedivision multiple access for indoors visible-light communications, e.g., can be modeled as parallel channels. Multi-input multioutput OWC systems can also be transformed, possibly with some performance loss, to parallel channels using pre-/postcoding. Studying the performance of such MC-OWC systems requires characterizing the capacity of the underlying parallel channels. In this paper, upper and lower bounds on the capacity of constant parallel OWC channels with a total average intensity constraint are derived. Then, the paper focuses on finding intensity allocations that maximize the lower bounds given channel-state information at the transmitter (CSIT). Due to its nonconvexity, the KKT conditions are used to describe a list of candidate allocations. Instead searching exhaustively for the best solution, low-complexity near-optimal algorithms are proposed. The resulting optimized lower bound nearly coincides with capacity at high signal-to-noise ratio (SNR). Under a quasi-static channel model and in the absence of CSIT, outage probability upper and lower bounds are derived. Those bounds also meet at high SNR, thus characterizing the outage capacity in this regime. Finally, the results are extended to a system with both average and peak intensity constraints.

  16. LIDAR AND INS FUSION IN PERIODS OF GPS OUTAGES FOR MOBILE LASER SCANNING MAPPING SYSTEMS

    Directory of Open Access Journals (Sweden)

    I. Klein

    2012-09-01

    Full Text Available Mobile laser scanning systems are becoming an increasingly popular means to obtain 3D coverage on a large scale. To perform the mapping, the exact position of the vehicle must be known throughout the trajectory. Exact position is achieved via integration of Global Positioning Systems (GPS and Inertial Navigation Systems (INS. Yet, in urban environments, cases of complete or even partial GPS outages may occur leaving the navigation solution to rely only on the INS. The INS navigation solution degrades with time as the Inertial Measurement Unit (IMU measurements contains noise, which permeates into the navigation equations. Degradation of the position determination leads to loss of data in such segments. To circumvent such drift and its effects, we propose fusing INS with lidar data by using building edges. This detection of edges is then translated into position data, which is used as an aiding to the INS. It thereby enables the determination of the vehicle position with a satisfactory level accuracy, sufficient to perform the laser-scanning based mapping in those outage periods.

  17. Global NDE Best Practice for Technology Improvement, Outage Management, Foreign Material Exclusion and Dose Control

    International Nuclear Information System (INIS)

    Glass, S. W.; Mohr, F.

    2010-01-01

    Non Destructive Examination (NDE) is a critical element of both Boiling Water and Pressurized Water Reactor outages. Frequently this includes critical path activity so both the utility and the inspection vendor are under intense pressure to perform the work quickly. Concurrent with AREVA's new global organization of NDE resources, AREVA NDE SOLUTIONS, efforts have intensified for global application of lessons learned and best practices. These best practices include new developments as well as continuous improvements to well established tools and NDE techniques. Advancements range from steam generator robots, advanced steam generator deposit characterization sensors and method, new phased array approaches for PWR and BWR reactor vessel examination, new sensors and approaches for RPV head examinations, plus advanced internals examination robots and methods. In addition to specialized tools and techniques, best practice includes numerous management innovations. AREVA's multi-disciplined integrated nuclear worker strategy helps to minimize the total number of personnel deployed to multi-task outages. Specific design and on-site practice has been implemented to minimize or eliminate foreign material from the reactor system and vigorous pursuit of dose management practices keeps our nuclear worker dose as low as reasonably achievable. The industry is moving to much more conservative nuclear worker dose limits. While this is proving to be an issue with many vendors, AREVA has had an internal policy of <2R since 2006. Globalizing the organization also helps AREVA manage peaks and unplanned emergency inspections from an enlarged pool of globally qualified inspection personnel and tools. (Author)

  18. Key Issues for the control of refueling outage duration and costs in PWR Nuclear Power Plants

    International Nuclear Information System (INIS)

    Degrave, Claude

    2002-01-01

    For several years, EDF, within the framework of the CIDEM1 project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories Design, Maintenance and Logistic Support, Outage Management. Most of the key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

  19. Key issues for the control of refueling outage duration and costs in PWR nuclear power plants

    International Nuclear Information System (INIS)

    Degrave, C.; Martin-Onraet, M.

    2000-01-01

    For several years, EDF, within the framework of the CIDEM project and in collaboration with some German Utilities, has undertaken a detailed review of the operating experience both of its own NPP and of foreign units, in order to improve the performances of future units under design, particularly the French-German European Pressurized Reactor (EPR) project. This review made it possible to identify the key issues allowing to decrease the duration of refueling and maintenance outages. These key issues can be classified in 3 categories: Design; Maintenance and Logistic Support; Outage Management. Most key issues in the design field and some in the logistic support field have been studied and could be integrated into the design of any future PWR unit, as for the EPR project. Some of them could also be adapted to current plants, provided they are feasible and profitable. The organization must be tailored to each country, utility or period: it widely depends on the power production environment, particularly in a deregulation context. (author)

  20. Outage Analysis of Practical FSO/RF Hybrid System With Adaptive Combining

    KAUST Repository

    Rakia, Tamer

    2015-08-01

    Hybrid free-space optical (FSO)/radio-frequency (RF) systems have emerged as a promising solution for high-data-rate wireless transmission. We present and analyze a transmission scheme for the hybrid FSO/RF communication system based on adaptive combining. Specifically, only FSO link is active as long as the instantaneous signal-to-noise ratio (SNR) at the FSO receiver is above a certain threshold level. When it falls below this threshold level, the RF link is activated along with the FSO link and the signals from the two links are combined at the receiver using a dual-branch maximal ratio combiner. Novel analytical expression for the cumulative distribution function (CDF) of the received SNR for the proposed hybrid system is obtained. This CDF expression is used to study the system outage performance. Numerical examples are presented to compare the outage performance of the proposed hybrid FSO/RF system with that of the FSO-only and RF-only systems. © 1997-2012 IEEE.