WorldWideScience

Sample records for reclamation program plan

  1. Draft reclamation program plan for site characterization

    International Nuclear Information System (INIS)

    1989-08-01

    As part of its obligations under the Nuclear Waste Policy Act, as amended, the US Department of Energy (DOE) has developed an environmental program that is to be implemented during site characterization at the Yucca Mountain site. This site is proposed for the location of the nation's first high-level radioactive waste repository. A program for the reclamation of areas disturbed by site characterization is part of the overall environmental program for that site. This Reclamation Program Plan (RPP) describes the reclamation policy of the DOE for the Yucca Mountain site and presents an overview of the reclamation program. The RPP also provides an overview of the reclamation needs relative to site characterization; a review of legislation and requirements pertinent to reclamation; and a review of previous commitments made by the DOE to certain types of reclamation activities. The objective of the DOE reclamation program at Yucca Mountain is to return land disturbed by site-characterization activities to a stable ecological state with a form and productivity similar to the predisturbance state. The DOE will take all reasonable and necessary steps to achieve this objective. 19 refs., 2 tabs

  2. 77 FR 55430 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Science.gov (United States)

    2012-09-10

    ... of its regulatory program and abandoned mine land reclamation plan, make grammatical changes, correct... portions of its regulatory program and abandoned mine land reclamation plan, make grammatical changes... Streams. PART 785--REQUIREMENTS FOR PERMITS FOR SPECIAL CATEGORIES OF MINING 785.13, 785.14, 785.15...

  3. 7 CFR 632.21 - Reclamation plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Reclamation plan. 632.21 Section 632.21 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Participation § 632.21 Reclamation plan. (a) Responsibility. Land users are responsible for developing a reclamation plan that will serve as a basis for a...

  4. The reclamation program for the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Ostler, W.K.; O'Farrell, T.P.; Winkel, V.K.; Schultz, B.W.

    1991-01-01

    The US Department of Energy (DOE) is required by law and other regulatory requirements to reclaim disturbances created by site characterization activities at Yucca Mountain. Because of the difficulty of reclaiming arid areas and the lack of site specific information on successful reclamation techniques and procedures, the DOE has developed a comprehensive reclamation program. The program consists of three phases: planning, operational and research. The planning phase is a continuing process that ensures that program policy, goals, tasks and responsibilities are clearly identified and linked. The operational phase uses best available knowledge to develop and implement reclamation plans that are site-specific for each disturbance. Reclamation activities start prior to any surface disturbance with a survey of each disturbance by trained scientists. The scientists survey the area for the presence of protected species or critical wildlife habitat. They also gather vegetation, landscape, soils and other environmental data that is used to assess the impact of the proposed disturbance. Recommendations can be made to either avoid areas or mitigate impacts. The operational phase includes interim reclamation to protect valuable resources and control erosion prior to final reclamation. Monitoring of reclaimed sites is conducted to correct problem areas and insure that reclamation objectives are achieved. The third phase of the reclamation program is designed to provide site-specific information on effective reclamation techniques through research and field demonstrations. 52 refs., 1 tab

  5. Land Reclamation Program annual report, 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    The Argonne Land Reclamation Program, sponsored by the United States Department of Energy's Assistant Secretary for Environment, is a joint effort of two Argonne divisions: Energy and Environmental Systems and Environmental Impact Studies. The program is carried out by a multidisciplinary team of scientists and engineers and has three primary objectives: (1) to develop energy-efficient and cost-effective mining and reclamation techniques; (2) to assist industry in evaluating the viability of environmental regulations and demonstrating techniques to meet these regulations; and (3) to supply data and evaluation techniques to decisionmakers concerned with trade-offs between energy development and environmental quality. Six integrated field research sites have been established to address problems associated with surface mining operations. This program relies heavily on input from industry and has developed working arrangements with coal companies at each of the current mining sites. A major area of interest is the development of a ten-year environmental mining and reclamation research plan for the Assistant Secretary for Environment. The Land Reclamation Program assigns the highest priority to the transfer to users of information generated by its research.

  6. Sand and gravel mine operations and reclamation planning using microcomputers

    Energy Technology Data Exchange (ETDEWEB)

    Ariffin, J.B.

    1990-02-01

    The purpose of this study is to focus on the application of microcomputers, also known as personal computers, in planning for sand and gravel mine operations and reclamation at a site in Story County, Iowa. This site, called the Arrasmith Pit, is operated by Martin Marietta Aggregates, Inc. The Arrasmith site, which encompasses an area of about 25 acres, is a relatively small site for aggregate mining. However, planning for the concurrent mine operation and reclamation program at this site is just as critical as with larger sites and the planning process is the same.

  7. Land reclamation program description

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-05-01

    The Land Reclamation Program will address the need for coordinated applied and basic research into the physical and ecological problems of land reclamation, and advance the development of cost-effective techniques for reclaiming and rehabilitating mined coal land to productive end uses. The purpose of this new program is to conduct integrated research and development projects focused on near- and long-term reclamation problems in all major U.S. coal resource regions including Alaska and to coordinate, evaluate, and disseminate the results of related studies conducted at other research institutions. The activities of the Land Reclamation Laboratory program will involve close cooperation with industry and focus on establishing a comprehensive field and laboratory effort. Research demonstration sites will be established throughout the United States to address regional and site-specific problems. Close cooperation with related efforts at academic institutions and other agencies, to transfer pertinent information and avoid duplication of effort, will be a primary goal of the program. The major effort will focus on the complete coal extraction/reclamation cycle where necessary to develop solutions to ameliorating the environmental impacts of coal development. A long-range comprehensive national reclamation program will be established that can schedule and prioritize research activities in all of the major coal regions. A fully integrated data management system will be developed to store and manage relevant environmental and land use data. Nine research demonstration sites have been identified.

  8. 30 CFR 902.20 - Approval of Alaska abandoned mine land reclamation plan.

    Science.gov (United States)

    2010-07-01

    ... available at: (a) Department of Natural Resources, Division of Mining and Water Management, 3601 C Street... reclamation plan. 902.20 Section 902.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE ALASKA...

  9. 30 CFR 906.20 - Approval of Colorado abandoned mine land reclamation plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado abandoned mine land reclamation plan. 906.20 Section 906.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO...

  10. Coal mine reclamation: the cooperative approach

    Energy Technology Data Exchange (ETDEWEB)

    Blazenko, E J; Kuhn, J A

    1976-07-01

    Salient problems encountered in coal mine reclamation include land use and environmental protection values, license applications and subsequent reports, and the development of sound reclamation planning programs. The facts of life to be dealt with in reclamation and reclamation planning include encounters with negative attitudes toward reclamation, basic physics, chemistry, biology and geology, and the ability or inability to respond properly. The cooperative approach to reclamation includes interfacing with mining company personnel, government agencies, public-interest groups and consultants. Some promising solutions to reclamation, especially in alpine and subalpine regions, include handling of materials and organic test plot research.

  11. Reclamation plans at uranium mill tailings sites

    International Nuclear Information System (INIS)

    Abt, S.R.; Nelson, J.D.

    1990-01-01

    Long-term stability of waste impoundments is of concern because of the long time periods over which various types of waste may remain active. Over the past decade much technology has been developed specifically for reclamation of uranium mill tailings impoundments. Aspects of this technology will be discussed here and is presented as also being directly applicable to reclamation of industrial waste impoundments in general. The paper discusses Title I and Title II sites which represent two different generations in uranium tailings impoundment construction. The comparison between the two represent differences in philosophies as well as in impoundment type. Reclamation of uranium mill tailings impoundments in the U.S. is controlled by Federal legislation, which has set forth the regulatory framework for reclamation plan approval. Title I requirements govern government owned inactive sites and Title II requirements govern active tailings impoundments or those operated by private industries. While the Title I and Title II designation may result in a slightly different regulatory process, reclamation of uranium tailings sites has the same. Differences between Title I and Title II reclamation plans to achieve surface stability relate primarily to the embankment and surface covers. The differences in the cover designs result from site-specific conditions, rather than from differences in engineering approaches or the regulatory process. This paper discusses the site-specific conditions that affect the selection of cover designs, and provides a comparative example to illustrate the effect of this condition

  12. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Surface mining near underground mining. 780.27 Section 780.27 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...

  13. 30 CFR 906.25 - Approval of Colorado abandoned mine land reclamation plan amendments.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado abandoned mine land reclamation plan amendments. 906.25 Section 906.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE COLORADO § 906.25 Approval of Colorado abandoned mine land reclamation plan amendments. The...

  14. Land reclamation program annual report, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, J. R.; Carter, R. P.; Cleaves, D. T.

    1979-07-01

    The Argonne Land Reclamation Program, sponsored by the United States Department of Energy's Assistant Secretary for Environment, is a joint effort of two Argonne divisions: Energy and Environmental Systems and Environmental Impact Studies. The program is carried out by a multidisciplinary team of scientists and engineers, and has three primary objectives: (1) to develop energy-efficient and cost-effective mining and reclamation techniques; (2) to assist industry in evaluating the applicability of regulations and demonstrating techniques to meet regulations; and (3) to supply data and evaluation techniques to decisionmakers concerned with trade-offs between energy development and environmental quality. Six integrated field research sites have been established to address problems associated with surface mining operations. This program relies heavily on input from industry and has developed excellent working arrangements with coal companies at each of the current mining sites. A major area of interest is the development of a computerized system to store and manage data gathered by the research staff. The Land Reclamation Program assigns the highest priority to the transfer to users of information generated by its research.

  15. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  16. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  17. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  18. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  19. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  20. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  1. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  2. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  3. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  4. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  5. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  6. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  7. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the Reclamation Rural Water Supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program? This program addresses domestic, municipal, and industrial water...

  8. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  9. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  10. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  12. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  13. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  14. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  15. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  16. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  17. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  18. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  19. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Science.gov (United States)

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  20. A modelling framework for reclamation planning of oil sands mines in northern Alberta

    International Nuclear Information System (INIS)

    Shaw, R.D.; Hamilton, H.R.; MacKinnon, M.D.; Gulley, J.R.

    1995-01-01

    The Reclamation Landscape Model Development Project was initiated in 1991 to develop a modelling framework to assist in oil sands mine reclamation planning. The initial year focused on developing a suite of computer simulation models suitable for evaluating hydrodynamic, water quality and biological conditions of fine-tails bottom lakes that would be capped with a layer of fresh water. That modelling framework was further refined in 1992--93 by incorporating probabilistic capabilities, developing of secondary production and food-chain components, and implementing of a model to simulate contaminant concentrations in the Athabasca River. In 1993--94 the emphasis expanded from a focus solely on developing tools for evaluating wet landscape options to developing an integrated modelling framework capable of evaluating both wet and dry landscape reclamation options. Major components completed in 1993--94 included development of a dry landscape module that includes surface runoff, groundwater seepage, air vapor and bioaccumulation components, a wetlands module to assist in evaluating treatment potential and for optimizing design of wetlands units, and a risk analysis module for quantifying risks to human health and ecological receptors. The Reclamation Landscape Model is a compartment modelling system that consists of a number of stand-alone computer programs that can be run in conjunction with one another or separately. The computer programs that simulate contaminant-fate processes range from simple empirical models to complex, mechanistic, three-dimensional, dynamic models, which are capable of predicting contaminant concentrations in water, soil, air and biota for a wide range of reclamation landscape units. Most of the component models have probabilistic capabilities

  1. Land reclamation program. Annual report, July 1976--October 1977

    Energy Technology Data Exchange (ETDEWEB)

    Carter, R. P.; Hinchman, R. R.; Johnson, D. O.

    1978-05-01

    The Argonne Land Reclamation Program, sponsored by the United States Department of Energy's Division of Environment and Safety, is a joint effort of two Argonne divisions: Energy and Environmental Systems and Environmental Impact Studies. The program is carried out by a multidisciplinary team of scientists and engineers, and has three primary goals: (1) to conduct research and development projects that are focused on both near- and far-term reclamation problems in all major U.S. coal regions; (2) to coordinate and evaluate related studies at other institutions; and (3) to keep industry and government decision-makers informed of reasonable reclamation options and their costs. Since many of the factors that influence reclamation success are region- or site-specific, the program has adopted a regional approach to field and laboratory research. In each of the nation's eight major coal regions, one or more mines have been (or will be) selected as sites for field studies. The vast amount of data gathered by the research arm of the program has also required the development of a data systems component of the program. This annual report is intended to provide a summary of the program's activities and accomplishments during fiscal year 1977.

  2. Reclamation planning for abandoned mining subsidence lands in eastern China: a case study

    International Nuclear Information System (INIS)

    Hu, Z.; Gu, H.

    1995-01-01

    China has a long history of coal mining and more than 96% of coal output is taken from underground mines each year. With the excavation of coal from underground, severe subsidence often results, which produces many subsidence lands. This paper explores the principle and methods of reclamation planning for abandoned mining subsidence lands and presents a case study in eastern China. A 373 ha of abandoned mining subsidence land in Anhui province was selected as an experiment site. Since China is a developing country and land shortage is severe in this area, the high economic benefits from the reclaimed land was the final reclamation goal. Based on the topography of subsidence lands, some parts of the abandoned lands were lands or lake-like troughs, restoring farmlands and fishponds were chosen as post-reclamation land uses. The elevation of reclaimed lands was the key for restoring farmland successfully because of the high underground water level in this area, and the optimum fishpond size and side-slope design were the keys to reach high reclamation income. The HDP (Hydraulic Dredge Pump) reclamation technique was used for restoring farmland and creating fishpond. A farming and aquaculture plan for high economic benefits was also designed. This project will make farmers, who own the lands, richer through reclamation. 3 refs., 5 figs., 1 tab

  3. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Science.gov (United States)

    2010-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... wildlife and their habitat. [47 FR 28600, June 30, 1982, as amended at 73 FR 67642, Nov. 14, 2008] ...

  4. Comparative study of German and Greek lignite mine reclamation

    International Nuclear Information System (INIS)

    Dietrich, N.L.

    1994-01-01

    The reclamation planning of three European lignite mining districts are compared: amount and extent of planning, integration with mining operations, and results. The districts are: Rheinbraun (Cologne), Leipzig-Borna (''East'' Germany), and Megalopolis (Greece). Lignite mines were visited and mining and reclamation personnel interviewed. The Rheinbraun mines have the most thorough reclamation operations. The integrated mine and reclamation operations are world class in size, scope, and detail of reclamation. A comprehensive landscape and reclamation plan is required in the mine permitting process. The Leipzig-Borna district is the second largest of the districts, studied little pre-mining planning of the post-mining landscape or land uses was evident. Reclamation is not closely integrated with the mining and typically occurs many years after the mining. Reduced lignite production since German reunification has left vast areas of disturbed land with little mining; and no funding for the reclamation of the large areas of mined land reclamation. The Greek Megalopolis mines have mine operations plan, but with no integrated reclamation planning. The initial spoil pile was reclaimed according to the original German mining plan. No pits have been reclaimed, and spoil areas are revegetated sporadically. The Rheinbraun mining operations Cologne which include a post mining landscape/land use plan have integrated and timely reclamation operations. The other two mining operations, which do not have a comprehensive and detailed reclamation and landscape/land use plans, do not integrate reclamation operations with the mining operations. The results are large areas of mined land unreclaimed for many years

  5. Staunton 1 Reclamation Demonstration Project. Progress report for 1977

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-12-01

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process for a deep coal mine refuse system. A typical abandoned midwestern deep coal mine refuse site was selected, final land use was determined, baseline data were collected, engineering plans were developed and implemented, and a post-construction evaluation was begun. The project is a cooperative effort by two state agencies--the Abandoned Mined Land Reclamation Council of Illinois the Illinois Institute for Environmental Quality--and the U.S. Department of Energy through the Land Reclamation Program at Argonne National Laboratory. Current investigations are monitoring groundwater, surface water quality, aquatic ecosystems, revegetation, soil characteristics, erosion and runoff, soil microbial and soil fauna populations, wildlife, and economic effects of the reclamation effort. The research is a multidisciplinary approach to the concept of ecosystem response to reclamation.

  6. Reclamation of opencut spoil piles

    Energy Technology Data Exchange (ETDEWEB)

    1976-07-01

    A successful reclamation program requires definite physical/engineering guidelines, a specific time commitment and to be fully integrated in the mining operation enabling most efficient use of available resources. This statement should be immediately qualified by saying that there must be enough flexibility to allow for varying mine layouts, plans and conditions. Mine conditions include physical and chemical spoil properties, climatic conditions and local topographic effects. Whilst reclamation is the responsibility of individual mine managers, the author undertakes a co-ordinating function amongst mine environmental officers to ensure that experience gained is recorded. Exchange of information between mines is maintained and there is a minimum duplication of effort.

  7. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    International Nuclear Information System (INIS)

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff's review of Atlas Corporation's proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs

  8. Final technical evaluation report for the proposed revised reclamation plan for the Atlas Corporation Moab Mill

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    This final Technical Evaluation Report (TER) summarizes the US Nuclear Regulatory Commission staff`s review of Atlas Corporation`s proposed reclamation plan for its uranium mill tailings pile near Moab, Utah. The proposed reclamation would allow Atlas to (1) reclaim the tailings pile for permanent disposal and long-term custodial care by a government agency in its current location on the Moab site, (2) prepare the site for closure, and (3) relinquish responsibility of the site after having its NRC license terminated. The NRC staff concludes that, subject to license conditions identified in the TER, the proposed reclamation plan meets the requirements identified in NRC regulations, which appear primarily in 10 CFR Part 40. 112 refs., 6 figs., 16 tabs.

  9. Alberta Reclamation Research annual report, 1990

    International Nuclear Information System (INIS)

    1991-01-01

    The Reclamation Research Technical Advisory Committee (RRTAC) was appointed by the Alberta Land Conservation and Reclamation Council to assist in technical matters related to the development and administration of the Council's research program. RRTAC develops reclamation research under four major program areas, and activities in these areas during the year are described in this report. The Plains Coal Reclamation Research Program addresses questions relating to groundwater and soil reconstruction in plains coal mining zones. The Mountain and Foothills Reclamation Research Program focuses on water management, soil reconstruction, reforestation, and wildlife habitat development, with objectives including control of erosion on a variety of disturbances such as coal mines and ash pits. The Oil Sands Reclamation Research Program is attempting to develop techniques to establish self-sustaining, erosion-free cover on oil sand tailings pond dikes, and to return tailings sand storage and overburden dumps to productive forests. The Oil and Gas Reclamation Research Program is concerned with disposal of drilling wastes and reclamation of lands disturbed by oil and gas activities. Under each program, the objectives, basic problems investigated, and research approach are presented, followed by description of specific projects involving such subjects as hydrology, revegetation, soil-water interactions, landscape and watershed design, soil reconstruction and amendment, and soil compaction. A list of research reports is included. 69 refs., 8 figs

  10. 78 FR 8821 - Abandoned Mine Land Reclamation Program; Limited Liability for Noncoal Reclamation by Certified...

    Science.gov (United States)

    2013-02-06

    ... Federal laws. It does not preclude liability for gross negligence or intentional misconduct by a state or... Law 109-432 (the ``2006 amendments'') substantially modified the AML reclamation program in title IV... tribe shall be liable under Federal law for any costs or damages as a result of any action or omitted...

  11. Fifth symposium on surface mining and reclamation. NCA/BCR coal conference and Expo IV

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    The Fifth Symposium on Surface Mining and Reclamation, sponsored by the National Coal Association and Bituminous Coal Research, Inc., was held at the Kentucky Fair and Exposition Center, Louisville, Kentucky, October 18-20, 1977. Twenty-six papers from the proceedings have been entered individually into EDB and ERA. Topics covered include spoil bank revegetation, use of aerial photography, reclamation for row crop production, hydrology, computer programs related to this work, subirrigated alluvial valley floors, reclamation on steep slopes, mountain top removal, surface mine road design, successional processes involved in reclamation, land use planning, etc. (LTN)

  12. Cultural keystone species in oil sands reclamation, Fort McKay, Alberta, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Garibaldi, A.; Straker, J. [Stantec Consulting Ltd., Surrey, BC (Canada)

    2009-12-15

    This presentation discussed a reclamation project conducted in Fort McKay, Alberta that was designed to address some of the social and cultural concerns related to oil sands mining in the region. Conventional reclamation practices in the region have demonstrated a lack of communication and participation from surrounding communities. The project was designed to address future land use plans and to include cultural values in the reclamation process. An integrative approach was used to address community landscapes issues and to explore methods of reclaiming the social and ecological components impacted by oil sands development. Traditional environmental knowledge was also incorporated into the program's design. Cultural keystone species (CKS) were used to provide a culturally relevant compass to guide people engaging in long-term reclamation and land use planning. Cultural keystone species were defined as salient species that significantly shape the cultural identity of a people. Keystone species in the region include the beaver; the moose; the ratroot; and cranberries and blueberries. Challenges to the program included the fact that the scale of oil sands disturbances are so immense that some community recommendations for reclaiming CKS may be impractical. tabs., figs.

  13. Integrated mined-area reclamation and land use planning. Volume 3A. A case study of surface mining and reclamation planning: South Boulder Creek Park Project, Sand and Gravel Operations, Boulder, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, L R; Perry, A O; LaFevers, J R

    1977-02-01

    This case study details reclamation planning for the Flatiron Companies' South Boulder Creek Park Project in Boulder, Colorado. The site contains a deposit of high-quality sand and gravel considered to be one of the best and largest known deposits of aggregate materials in the Front Range area. The aggregate deposit is located in a highly visible site just off the Denver-Boulder Turnpike at the entrance to the city from Denver, and adjacent to a residential portion of the city. In order to make maximum use of pre-mining planning, as a tool for resolving a conflict over the company's proposed operation, an extensive cooperative planning effort was initiated. This included the preparation of an environmental impact assessment, numerous public hearings, operating and reclamation plan review by city authorities, annexation of the site to the city, and the granting of a scenic easement on the property to the city for the development of a regional recreation park. A suite of contractual agreements was worked out among Flatiron Companies, the City of Boulder, the Colorado Open Lands Foundation, and the Federal Bureau of Outdoor Recreation. The purpose of this case study is to allow the planner to gain insight into the procedures, possibilities, and constraints involved in premining planning in a cooperative situation.

  14. Site Study Plan for soils, Deaf Smith County site, Texas: Environmental Field Program: Preliminary draft

    International Nuclear Information System (INIS)

    1987-06-01

    The Soils Site Study Plan describes a field program consisting of a soil characterization survey, impact monitoring of soils, predisturbance soil salinity survey, and a reclamation suitability study. This information will be used to plan for soil stripping, stockpiling, and replacement; reclamation of soils; determining predisturbance chemical and physical characteristics of the soils; including salinity levels; and monitoring for changes in chemical and physical characteristics of the soil. The SSP describes for each study the need for the study, the study design, data management and use, schedule of proposed activities, and the quality assurance program. These studies will provide data needed to satisfy requirements contained in, or derived from, the Salt Repository Project Requirements Document. 75 refs., 10 figs., 5 tabs

  15. 36 CFR 9.11 - Reclamation requirements.

    Science.gov (United States)

    2010-07-01

    ... MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as... within the time specified in an approved mining reclamation plan, unless a longer period is authorized in... topsoil necessary for vegetative restoration; and (vi) Reestablishing native vegetative communities. (b...

  16. Proceedings of the 2009 Atlantic reclamation conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-01

    This conference provided a forum for industry leaders of reclamation and restoration to advance knowledge, raise awareness and examine problems and solutions in the areas of land and waterway reclamation, restoration and rehabilitation. With a history of resource and industrial development, many communities in Atlantic Canada are faced with the challenge of restoring contaminated sites and abandoned mines sites, including both underground and surface coal mines. The topics discussed at this conference ranged from mine site reclamation, in-situ and ex-situ remediation, contaminated site restoration, erosion and sediment control planning, revegetation planning, wetland and soil quality research, landuse planning, regulation, and environmental risk. One of the 25 presentations featured at this conference has been catalogued separately for inclusion in this database. tabs., figs.

  17. 30 CFR 784.15 - Reclamation plan: Land use information.

    Science.gov (United States)

    2010-07-01

    .... The narrative shall provide analyses of: (i) The capability of the land before any mining to support a... Section 784.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  18. 30 CFR 780.23 - Reclamation plan: Land use information.

    Science.gov (United States)

    2010-07-01

    .... The narrative shall provide analyses of: (i) The capability of the land before any mining to support a... Section 780.23 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  19. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada: Volume 1

    International Nuclear Information System (INIS)

    1987-08-01

    Environmental protection during the course of siting and constructing a repository is mandated by NWPA in conjunction with various phases of repository siting and development. However, DOE has issued no comprehensive, integrated plan for environmental protection. Consequently, it is unclear how DOE will accomplish environmental assessment, monitoring, impact mitigation, and site reclamation. DOE should, therefore, defer further implementation of its current characterization program until a comprehensive environmental protection plan is available. To fulfill its oversight responsibilities the State of Nevada has proposed a comprehensive environmental program for the Yucca Mountain site that includes immediately undertaking studies to establish a 12-month baseline of environmental information at the site; adopting the DOE Site Characterization Plan (SCP) and the engineering design plans it will contain as the basis for defining the impact potential of site characterization activities; using the environmental baseline and the SCP to evaluate the efficacy of the preliminary impact analyses reported by DOE in the EA; using the SCP as the basis for discussions with federal, state, and local regulatory authorities to decide which environmental requirements apply and how they can be complied with; using the SCP, the EA impact review, and the compliance requirements to determine the scope of reclamation measures needed; and developing environmental monitoring and impact mitigation plans based on the EA impact review, compliance requirements, and anticipated reclamation needs

  20. Vegetation development and native species establishment in reclaimed coal mine lands in Alberta : directions for reclamation planning

    Energy Technology Data Exchange (ETDEWEB)

    Longman, P. [Calgary Univ., AB (Canada). Faculty of Environmental Design

    2010-07-01

    This paper discussed a study undertaken to evaluate reclamation vegetation at Coal Valley Mine in Alberta with respect to expected vegetation changes over time, establishing a successional model of vegetation development, and factors contributing to the observed patterns. Most of the expected vegetation trends were evident, including lower grass cover and height, lower legume cover, a higher degree of native plant species richness, and the establishment of woody species. Four vegetation communities (2 graminoid-dominated and 2 conifer-dominated) were identified in the study, for which a possible successional model was constructed. Vegetation dynamics for agronomic grasses, legumes, and tree cover were discussed. Areas with Lodgepole Pine were found to have higher species richness and cover. Concerns were raised that the identified trends may not in fact supply the expected opportunities for native species establishment. In order to facilitate the establishment of native species and better manage reclamation vegetation development, the author recommended that a conifer overstory be established to increase native richness and native cover, and that more appropriate seeding mixes be developed as certain agronomic species are detrimental to long-term goals. The author also recommended that site-specific seed mixes be developed according to end land-use goals, that a planting program for native plants and shrubs be developed, and that a monitoring program be established to better inform future reclamation efforts. The recommendations were designed to bring reclamation efforts into line with reclamation goals. 12 refs., 4 tabs., 2 figs.

  1. Basalt Waste Isolation Project exploratory shaft site: Final reclamation report

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.

    1990-06-01

    The restoration of areas disturbed by activities of the Basalt Waste Isolation Project (BWIP) constitutes a unique operation at the US Department of Energy's (DOE) Hanford Site, both from the standpoint of restoration objectives and the time frame for accomplishing these objectives. The BWIP reclamation program comprises three separate projects: borehole reclamation, Near Surface Test Facility (NSTF) reclamation, and Exploratory Shaft Facility (ESF) reclamation. The main focus of this report is on determining the success of the revegetation effort 1 year after work was completed. This report also provides a brief overview of the ESF reclamation program. 21 refs., 7 figs., 14 tabs

  2. Changing knowledge needs for wellsite reclamation

    International Nuclear Information System (INIS)

    Smith, J.

    1996-01-01

    The educational and informational sources available in the field of land reclamation were reviewed, and a qualitative assessment of their effectiveness was made. The focus was on reclamation of abandoned petroleum wellsite and related facilities within the province of Alberta. The review showed that land reclamation involves knowledge and experience from several scientific disciplines, as well as technological expertise, an understanding of the legislative environment and the impacts of such legislation on stakeholders who are party to a site reclamation. Since the combination of these necessary skills is not always present, there is a need for formalized educational opportunities. The review identified a number of institutions offering reclamation related programs; also professional and industry associations which also provide reliable and consistent information. By contrast, regulatory requirements frequently contain inconsistencies between reclamation criteria and common law; these should be addressed and remedied as soon as practicable. 1 ref

  3. Abandoned coal mine refuse areas: their reclamation and use

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S. D.; Carter, R. P.

    1977-01-01

    There are over 4,000 abandoned deep coal mine refuse areas in Illinois ranging in size from a few acres to as large as 160 acres. These sites produce quantities of pollutants which affect the environment, have no real land value, and are a scar on the landscape. The Staunton 1 Site Reclamation Demonstration Project addressess these problems. It also is developing and evaluating new cost-effective methods for reclaiming refuse areas of this type. The program involved determining the final land use for the site, development of detailed engineering plans and specifications for the reclamation effort, a prereclamation environmental inventory, and implementation. Post-construction evaluation is now in process to determine the effectiveness of the reclamation effort. Detailed investigations are being conducted to determine surface water quality improvement, the amount of suitable surface cover and amendments required for revegetation, and field evaluation of candidate vegetation species for revegetation. Other research is examining soil microbial populations, soil fauna reactions, and changes in surface material characteristics at the reclamation site. Surveys are being conducted on groundwater quality, effects on the aquatic ecosystem, and wildlife use of the area. An economic evaluation is underway to determine the cost effectiveness of the total effort and of individual reclamation procedures. Preliminary results from the first year's environmental evaluation of various method tested will be described in detail. An economic assessment, including cost effectiveness, of the first year's work is given.

  4. Coal refuse reclamation project

    Energy Technology Data Exchange (ETDEWEB)

    Zellmer, S.D.

    1979-04-06

    A 13.8 ha abandoned coal refuse site in southwestern Illinois was reclaimed by recontouring the refuse material and covering it with a minimum 30 cm of soil. The reclamation procedure included determination of the site's final land use, collection of preconstruction environmental data, and development and implementation of engineering plans. The project is demonstrating methods that can be used to reclaim abandoned coal refuse sites, and a multidisciplinary approach is being used to evaluate postconstruction environmental and economic effects of the reclamation effort. Surface water quality has shown significant improvement and plant cover is becoming established on the site. Soil microbial populations are developing and wildlife habitats are forming. The economic value of the site and adjacent properties has increased substantially and the area's aesthetic value has been enhanced. This project is providing valuable design data for future reclamation efforts of this type.

  5. 76 FR 76104 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Science.gov (United States)

    2011-12-06

    ... of their regulatory program and abandoned mine land plan, make grammatical changes, correct..., make grammatical changes, correct punctuation, revise dates, and add citations. The Arkansas... SPECIAL CATEGORIES OF MINING 785.14, 785.16, 785.18, and 785.25 Mountaintop Removal Mining; Permits...

  6. Canadian Natural Resources Limited uses Siteview(TM) to manage its reclamation sites

    International Nuclear Information System (INIS)

    Holtby, L.

    2003-01-01

    Implementation of the Siteview(TM) computer software package designed to capture and manage reclamation data, by Canadian Natural Resources Limited is reported. Use of this software, developed by Pelodon Computer Enterprises in Calgary, enables Canadian Natural Resources to track from a single file data from each of over 3000 sites from the pre-construction stage right through to the final reclamation. Having all data in a single file permits the company to track the number of Reclamation Certificate applications submitted and received for a specific time period, helping them to capture the liability reduction and rental reduction associated with those sites and in general, manage their reclamation program more efficiently. Tracking the reclamation sites is by specific Site Status Codes, which allow the company to quickly determine current status of each site. Budgeting for reclamation can also be planned more accurately based on the current status of sites. Siteview(TM) also manages waste disposal information in the Guide 50 Drilling Waste Disposal Notification forms by digitally inputting all required data such as waste disposal location, mud system, and the volume of mud, and generating reports based on various waste disposal parameters. The software is also used by environmental consultants to track client's well site operations, and display them graphically in their reports, thus providing value-added services to their clients

  7. Water Reclamation and Reuse.

    Science.gov (United States)

    Smith, Daniel W.

    1978-01-01

    Presents a literature review of water reclamation and reuse. This review covers: (1) water resources planning; (2) agriculture and irrigation; (3) ground recharge; (4) industrial reuse; (5) health considerations; and (6) technology developments. A list of 217 references is also presented. (HM)

  8. Proceedings of the 2008 Atlantic Reclamation conference

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This annual event served as a forum to share information, advance knowledge, raise awareness and examine problems and solutions in the many areas of land and waterway reclamation, restoration and rehabilitation. Given the long history of resource and industrial development in Atlantic Canada, many communities are faced with the challenge of restoring contaminated sites, brownfields, and abandoned mines sites, including both underground and surface coal mines. The topics discussed at this conference ranged from mine site reclamation, brownfield redevelopment, contaminated site restoration, erosion and sediment control planning, revegetation planning, wetland and soil quality research, landuse planning, landscape design, policy, regulation and fiscal planning, environmental risk and liability insurance policies. The conference featured 14 presentations, of which 4 have been catalogued separately for inclusion in this database. tabs., figs.

  9. Countermeasures for China’s Ecological Environment Construction in Land Reclamation

    Institute of Scientific and Technical Information of China (English)

    Chen; LI; Xinfeng; LIU; Zhe; PENG; Tao; SI; Lingfeng; KONG

    2013-01-01

    Basic situation of the current ecological environment construction in land consolidation and rehabilitation of China is introduced. The related advanced experience abroad is summarized from mainly four aspects, namely policy, system as well as subject development, planning guidance, design method of project planning and engineering study, and practical countermeasures to China’s ecological environment construction in land reclamation are proposed. In terms of policy, system and subject, relevant regulations, policies and system construction should be strengthened and the framework of policy, system and subject development in ecological landscape construction of China’s land reclamation should be proposed, integrating ecological environment construction into land reclamation. At the level of strategic planning, the spatial layout and construction key points of green infrastructure in land reclamation of "urban multi-functional developing region, eastern economic developed region, central modern agricultural region and northwestern ecological fragile region" should be achieved. At the level of project planning design, ecological principles, sustainable landscape design principles and vernacular landscape design methods are to be integrated into the planning procedure to form operable technique regulations or introductions. At the level of engineering design, engineering technique system, standards and regulations of ditches, roads, forests and channels with local distinctions should be formulated according to the characters and strategic demands of urbanization, industrialization, agriculture modernization and ecological environment preservation in different regions.

  10. Conservation and reclamation at Alberta's mineable oil sands

    Energy Technology Data Exchange (ETDEWEB)

    Purdy, B.; Richens, T. [Alberta Environment, Edmonton, AB (Canada)

    2010-07-01

    The regulatory foundation for oil sands in this region is established by the Energy Resources Conservation Board, Environmental Protection and Enhancement Act (EPEA), as well as the Water Act. This presentation discussed the regulatory foundation for conservation and reclamation in the mineable oil sands region. EPEA requirements and conservation objectives were identified. EPEA conservation and reclamation requirements stipulate that an operator must conserve and reclaim and obtain a reclamation certificate. EPEA approvals that were presented compared prescriptive standards versus meeting outcomes at certification. Operational and management challenges as well as the role of research networks and multi-stakeholder organizations were also addressed. Challenge facing the industry include progressive reclamation; tailings management and process-affected water; reclamation certification; integrated landscapes; soil handling and revegetation and monitoring and research. The presentation demonstrated that reclamation begins with mine planning and ends with certification. figs.

  11. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  12. 30 CFR 780.15 - Air pollution control plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Air pollution control plan. 780.15 Section 780.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT...

  13. 30 CFR 784.26 - Air pollution control plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Air pollution control plan. 784.26 Section 784.26 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATION...

  14. Town of Edinburg landfill reclamation demonstration project. Final report

    International Nuclear Information System (INIS)

    1992-01-01

    A landfill reclamation demonstration project was hosted at the Town of Edinburg municipal landfill in northwest Saratoga County, with majority funding provided by the New York State Energy Research and Development Authority. The report examines various separation techniques employed at the site and appropriate uses for reclaimed materials. Specifications regarding engineered work plans, health and safety monitoring, and contingency preparedness are discussed. Major potential applications and benefits of using landfill reclamation technology at existing landfills are identified and discussed. The research and development aspect of the report also examines optimal screening technologies, site selection protocol and the results of a test burn of reclaimed waste at a waste-to-energy facility. Landfill reclamation costs are developed, and economic comparisons are made between reclamation costs and conventional landfill closure costs, with key criteria identified

  15. Relating Climate Change Risks to Water Supply Planning Assumptions: Recent Applications by the U.S. Bureau of Reclamation (Invited)

    Science.gov (United States)

    Brekke, L. D.

    2009-12-01

    Presentation highlights recent methods carried by Reclamation to incorporate climate change and variability information into water supply assumptions for longer-term planning. Presentation also highlights limitations of these methods, and possible method adjustments that might be made to address these limitations. Reclamation was established more than one hundred years ago with a mission centered on the construction of irrigation and hydropower projects in the Western United States. Reclamation’s mission has evolved since its creation to include other activities, including municipal and industrial water supply projects, ecosystem restoration, and the protection and management of water supplies. Reclamation continues to explore ways to better address mission objectives, often considering proposals to develop new infrastructure and/or modify long-term criteria for operations. Such studies typically feature operations analysis to disclose benefits and effects of a given proposal, which are sensitive to assumptions made about future water supplies, water demands, and operating constraints. Development of these assumptions requires consideration to more fundamental future drivers such as land use, demographics, and climate. On the matter of establishing planning assumptions for water supplies under climate change, Reclamation has applied several methods. This presentation highlights two activities where the first focuses on potential changes in hydroclimate frequencies and the second focuses on potential changes in hydroclimate period-statistics. The first activity took place in the Colorado River Basin where there was interest in the interarrival possibilities of drought and surplus events of varying severity relevant to proposals on new criteria for handling lower basin shortages. The second activity occurred in California’s Central Valley where stakeholders were interested in how projected climate change possibilities translated into changes in hydrologic and

  16. BUILDING MATERIALS RECLAMATION PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    David C. Weggel; Shen-En Chen; Helene Hilger; Fabien Besnard; Tara Cavalline; Brett Tempest; Adam Alvey; Madeleine Grimmer; Rebecca Turner

    2010-08-31

    This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C&D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisory panel was organized, and research was conducted to evaluate high volume C&D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C&D materials. Table 1 summarizes the six subprojects, including the C&D material studied and the graduate student and the faculty advisor on each subproject.

  17. Building Materials Reclamation Program

    International Nuclear Information System (INIS)

    Weggel, David C.; Chen, Shen-En; Hilger, Helene; Besnard, Fabien; Cavalline, Tara; Tempest, Brett; Alvey, Adam; Grimmer, Madeleine; Turner, Rebecca

    2011-01-01

    This report describes work conducted on the Building Materials Reclamation Program for the period of September 2008 to August 2010. The goals of the project included selecting materials from the local construction and demolition (C and D) waste stream and developing economically viable reprocessing, reuse or recycling schemes to divert them from landfill storage. Educational resources as well as conceptual designs and engineering feasibility demonstrations were provided for various aspects of the work. The project was divided into two distinct phases: Research and Engineering Feasibility and Dissemination. In the Research Phase, a literature review was initiated and data collection commenced, an advisory panel was organized, and research was conducted to evaluate high volume C and D materials for nontraditional use; five materials were selected for more detailed investigations. In the Engineering Feasibility and Dissemination Phase, a conceptual study for a regional (Mecklenburg and surrounding counties) collection and sorting facility was performed, an engineering feasibility project to demonstrate the viability of recycling or reuse schemes was created, the literature review was extended and completed, and pedagogical materials were developed. Over the two-year duration of the project, all of the tasks and subtasks outlined in the original project proposal have been completed. The Final Progress Report, which briefly describes actual project accomplishments versus the tasks/subtasks of the original project proposal, is included in Appendix A of this report. This report describes the scientific/technical aspects (hypotheses, research/testing, and findings) of six subprojects that investigated five common C and D materials. Table 1 summarizes the six subprojects, including the C and D material studied and the graduate student and the faculty advisor on each subproject.

  18. Addressing Open Water Data Challenges in the Bureau of Reclamation

    Science.gov (United States)

    Brekke, L. D.; Danner, A.; Nagode, J.; Rocha, J.; Poulton, S.; Anderson, A.

    2017-12-01

    The Bureau of Reclamation is largest wholesaler of water in the United States. Located in the 17 western states, Reclamation serves water to 31 million people, provides irrigated water to 20 percent of Western farmers, and is the second largest producer of hydroelectric power in the United States. Through these activities, Reclamation generates large amounts of water and water-related data, describing reservoirs and river system conditions, hydropower, environmental compliance activities, infrastructure assets, and other aspects of Reclamation's mission activities. Reclamation aims to make water and water-related data sets more easily found, accessed, and used in decision-making activities in order to benefit the public, private sector, and research communities. Historically, there has not been an integrated, bureau-wide system to store data in machine-readable formats; nor a system to permit centralized browsing, open access, and web-services. Reclamation began addressing these limitations by developing the Reclamation Water Information System (RWIS), released in Spring 2017 (https://water.usbr.gov/). A bureau-wide team contributed to RWIS development, including water data stewards, database administrators, and information technology (IT) specialists. The first RWIS release publishes reservoir time series data from Reclamation's five regions and includes a map interface for sites identification, a query interface for data discovery and access, and web-services for automated retrieval. As RWIS enhancement continues, the development team is developing a companion system - the Reclamation Information Sharing Environment (RISE) - to provide access to the other data subjects and types (geospatial, documents). While RWIS and RISE are promising starts, Reclamation continues to face challenges in addressing open water data goals: making data consolidation and open publishing a value-added activity for programs that publish data locally, going beyond providing open access

  19. Prairie of mine(s) : cultural reclamation of the Estevan/Bienfait Coalfields

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, S.

    2010-07-01

    A cultural reclamation project was launched in the Bienfait region of southern Saskatchewan where lignite mining has been ongoing since the 1800s. Evidence of 5 surface mines, 2 power stations and thousands of acres of spoil piles remain at the abandoned site. The region also comprises 140 abandoned underground mines and 4 mined-out townsites. The project introduced cultural reclamation into the role of landscape architecture, specifically in the planning and design of reclaimed mining lands. At the present time, the reclamation of post-extractive sites is limited to focusing almost exclusively on ecological factors, but failing to recognize the people and the industrial processes that actively transformed the landscape can disengage people from their past. The project concludes with a proposed master plan in addition to a few site-specific interventions that interrogate and explore the role of experiential, cultural, and historical elements in the reclamation of a site. In doing so, awareness is created about the ways in which various landscapes are manipulated every day in order for people to live in greater comfort.

  20. Interim reclamation report, Basalt Waste Isolation project: Boreholes, 1989

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.; Hefty, M.G.

    1990-03-01

    In 1968, a program was started to assess the feasibility of storing Hanford Site defense waste in deep caverns constructed in basalt. This program was expanded in 1976 to include investigations of the Hanford Site as a potential location for a mined commercial nuclear waste repository. An extensive site characterization program was begun to determine the feasibility of using the basalts beneath the Hanford Site for the repository. Site research focused primarily on determining the direction and speed of groundwater movement, the uniformity of basalt layers, and tectonic stability. Some 98 boreholes were sited, drilled, deepened, or modified by BWIP between 1977 and 1988 to test the geologic properties of the Site. On December 22, 1987, President Reagan signed into law the Nuclear Waste Policy Amendments Act of 1987, which effectively stopped all repository-related activities except reclamation of disturbed lands at the Hanford Site. This report describes the development of the reclamation program for the BWIP boreholes, its implementation, and preliminary estimates of its success. The goal of the reclamation program is to return sites disturbed by the repository program as nearly as practicable to their original conditions using native plant species. 48 refs., 28 figs., 14 tabs

  1. Temporal-spatial variations and driving factors analysis of coastal reclamation in China

    Science.gov (United States)

    Meng, Weiqing; Hu, Beibei; He, Mengxuan; Liu, Baiqiao; Mo, Xunqiang; Li, Hongyuan; Wang, Zhongliang; Zhang, Yu

    2017-05-01

    Coastal reclamation is the gain of land from the sea or coastal wetlands for agricultural purposes, industrial use or port expansions. Large-scale coastal land reclamation can have adverse effects on the coastal environment, including loss of marine habitats and deterioration of coastal water quality. In recent decades, coastal land reclamation has occurred extensively to meet the increasing needs of rapid economic development and urbanization in China. The overall objective of this study is to understand the coastal reclamation status of China from 1979 to 2014 and analyzed its driving factors for mitigating negative ecological effects. The data of coastal reclamation were done with the ERDAS Imagine V9.2 platform and ArcGIS software based on remote images including Landsat, SPOT, ZY-2 and ZY-3. Potential driving factors for sea reclamation were selected based on statistics bulletins and the knowledge of experts in coastal management. In order to understand the relationships among possible impact factors and coastal reclamation, the Partial Least-Squares Regression models was constructed. The analysis results indicated that the total area of reclamation was 11162.89 km2 based on remote sensing images between 1979 and 2014. Shandong Province is the largest reclamation area, reaching 2736.54 km2, and the reclamation is mainly concentrated in Zhejiang, Jiangsu and Liaoning, where the reclamation areas were all more than 1000 km2. According to the remote sensing images, there are three coastal reclamation hotspot regions including Bohai bay (in which is located Liaoning, Tianjin and Hebei), Jiangsu province coastal area and Hangzhou bay (in Zhejiang province). A large scale land reclamation plan of more than 5880 km2 has been made by local government and 2469 km2 has approved by the State Council. From the analyzed results, there is a significant collinearity between these indicators, and no significant correlation between the area of reclamation and selected

  2. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Science.gov (United States)

    2010-10-01

    ... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...

  3. Proceedings of the 15. annual national meeting of the American Society for Surface Mining and Reclamation. Mining -- Gateway to the future

    International Nuclear Information System (INIS)

    Throgmorton, D.; Nawrot, J.; Mead, J.; Galetovic, J.; Joseph, W.

    1998-01-01

    The 124 papers of these proceedings are arranged under the following topical sections: Minerals education; Hydrology--Characterization and monitoring; Tailings--Reclamation; Reforestation; Mine drainage--Biogeochemical processes; Mine drainage--Treatment, general; Mine drainage--Passive treatment, wetlands; Mine drainage--Prediction and monitoring; Acid soils--Reclamation practices; Wildlife and fisheries habitat; Subsidence--Engineering practices and environmental effects; OSM acid forming materials mini workshops; RUSLE--Erosion prediction techniques on mined construction and reclaimed lands; IDNR wetlands technology transfer program; Mine planning and postmining land use; Vegetation establishment--Principles and practices; Vegetation establishment--Warm season grasses; Coal combustion by-products--General; Coal combustion by-products--Mine drainage treatment; and Prime farmland reclamation and mine soils management. Papers within scope have been processed separately for inclusion on the data base

  4. Reclamation challenges at Usibelli Coal Mine in Healy, Alaska

    International Nuclear Information System (INIS)

    Jackson, L.P.

    1998-01-01

    Successful reclamation in the Interior of Alaska requires planning in order to avoid major setbacks. Usibelli Coal Mine is located at a North Latitude of approximately 64 degrees. Temperature extremes in the Interior of Alaska range from a high of 90 degrees Fahrenheit to a low of minus 60 degrees Fahrenheit. The challenges in this sub-arctic climate are many. Several unique reclamation challenges are present due to the cold climate. Discontinuous permafrost is prevalent on north facing slopes. This presents stability problems if placed in inappropriate locations. Very detailed planning is required to assure that no stability problems occur. The construction of drainage channels in ice-rich permafrost areas also requires extra care to assure that water flows along the surface rather than down into the spoil. Mineral topsoil is often not present on the areas to be mined. Often non-salvageable organic permafrost soils are present. These require special handling and must be isolated to avoid stability problems. Since the ground is frozen for 7--8 months a year the reestablishment of vegetation requires a very aggressive planting schedule. Grass seed is applied by fixed wing aircraft and shrubs are planted from locally collected seed. By planning properly prior to mining successful reclamation can take place in the Interior of Alaska

  5. Spray Lakes reclamation project

    International Nuclear Information System (INIS)

    Zacaruk, M.R.

    1996-01-01

    When the level of the Spray Lakes (Alberta) reservoir was lowered by four metres, 208 ha of shoreline was exposed offering little to no wildlife benefit and only limited recreation potential. A reclamation plan for 128 ha of shoreline was therefore developed. A wild life-palatable, self-sustaining vegetation cover was established. Approximately 90 ha was scarified, and/or had tree stumps removed prior to seeding, while approximately 40 ha was seeded and fertilized only. The remaining 80 ha of shoreline was not revegetated due to limited access; these areas will be allowed to re-establish naturally from the forested edge. The species were selected based on their adaptation to alkaline soils, drought tolerance, persistence in a stand and rooting characteristics, as well as palatability to wildlife. Alfalfa, white clover and fall rye were seeded. In general, all areas of the reclamation plan are successfully revegetated. Areas which were recontoured are stable and non-eroding. Success was most significant in areas which had been scarified, then seeded and trackpacked. Areas that were seeded and fertilized only were less well established at the end of the first year, but showed improvement in the second and third years. The area will be monitored to ensure the reclaimed vegetation is self-sustaining

  6. Surface mining and land reclamation in Germany

    Energy Technology Data Exchange (ETDEWEB)

    Nephew, E.A.

    1972-05-01

    Mining and land restoration methods as well as planning and regulatory procedures employed in West Germany to ameliorate environmental impacts from large-scale surface mining are described. The Rhineland coalfield in North Rhine Westphalia contains some 55 billion tons of brown-coal (or lignite), making the region one of Europe's most important energy centers. The lignite is extracted from huge, open-pit mines, resulting in large areas of disturbed land. The German reclamation approach is characterized by planning and carrying out the mining process as one continuum from early planning to final restoration of land and its succeeding use. Since the coalfield is located in a populated region with settlements dating back to Roman times, whole villages lying in the path of the mining operations sometimes have to be evacuated and relocated. Even before mining begins, detailed concepts must be worked out for the new landscape which will follow: the topography, the water drainage system, lakes and forests, and the intended land-use pattern are designed and specified in advance. Early, detailed planning makes it possible to coordinate mining and concurrent land reclamation activities. The comprehensive approach permits treating the overall problem as a whole rather than dealing with its separate aspects on a piecemeal basis.

  7. Monitoring and analysis of coastal reclamation from 1995-2015 in Tianjin Binhai New Area, China.

    Science.gov (United States)

    Chen, Wengang; Wang, Dongchuan; Huang, Yong; Chen, Liding; Zhang, Lihui; Wei, Xiangwang; Sang, Mengqin; Wang, Feicui; Liu, Jinya; Hu, Bingxu

    2017-06-20

    Increasing coastal reclamation activities have been undertaken to solve the conflict between people and land resources, creating significant challenges for coordinating coastal reclamation, economic development and environmental protection. This paper analyzes the effects of coast reclamation on Gross Domestic Product growth and the quality of inshore seawater in the Tianjin Binhai New Area. Remote sensing and a Geographic Information System were used to extract the information of coastal reclamation. The correlation between the area of coastal reclamation, GDP growth and the quality of inshore seawater was analyzed and a decoupling elasticity model was used to explore trends in the relationship between economic development and coastal reclamation. Results showed that coastal reclamation activities played an important role in promoting economic development, but greatly damaged the ecological environment. Although the relationship between coastal reclamation and economic development has weakened during the last three periods, the influence on the environment will continue because of the cumulative effects of pollution. To maintain a balance between coastal reclamation, economic development and environmental protection, (1) coastal reclamation planning must address both economic and environmental outcomes; (2) environmental deficiencies from existing coastal reclamation projects must be rectified; and (3) the legal system regulating coastal reclamation needs to be refined and strengthened.

  8. Interim reclamation report: Basalt Waste Isolation Project exploration shaft site

    International Nuclear Information System (INIS)

    Brandt, C.A.; Rickard, W.H. Jr.; Hefty, M.G.

    1990-02-01

    In 1968, a program was started to assess the feasibility of storing Hanford Site defense waste in deep caverns constructed in basalt. This program was expanded in 1976 to include investigations of the Hanford Site as a potential location for a mined commercial nuclear waste repository. Extensive studies of the geotechnical aspects of the site were undertaken, including preparations for drilling a large diameter Exploratory Shaft. This report describes the development of the reclamation program for the Exploratory Shaft Facility, its implementation, and preliminary estimates of its success. The goal of the reclamation program is to return sites disturbed by the repository program as nearly as practicable to their original conditions using native plant species. 43 refs., 19 figs., 9 tabs

  9. Integrated mined-area reclamation and land-use planning. Volume 3C. A case study of surface mining and reclamation planning: Georgia Kaolin Company Clay Mines, Washington County, Georgia

    Energy Technology Data Exchange (ETDEWEB)

    Guernsey, J L; Brown, L A; Perry, A O

    1978-02-01

    This case study examines the reclamation practices of the Georgia Kaolin's American Industrial Clay Company Division, a kaolin producer centered in Twiggs, Washington, and Wilkinson Counties, Georgia. The State of Georgia accounts for more than one-fourth of the world's kaolin production and about three-fourths of U.S. kaolin output. The mining of kaolin in Georgia illustrates the effects of mining and reclaiming lands disturbed by area surface mining. The disturbed areas are reclaimed under the rules and regulations of the Georgia Surface Mining Act of 1968. The natural conditions influencing the reclamation methodologies and techniques are markedly unique from those of other mining operations. The environmental disturbances and procedures used in reclaiming the kaolin mined lands are reviewed and implications for planners are noted.

  10. Jackpile-Paguate Uranium Mine Reclamation Project, Laguna Indian Reservation, Cibola County, New Mexico

    International Nuclear Information System (INIS)

    1986-10-01

    The final version of environmental impact statement, EPA No. 860443F, relates to a proposed reclamation plan for the Jackpile-Paguate uranium mine in New Mexico. The statement describes backfilling of disturbed areas, the reduction of waste dump slopes, steam stabilization, and revegetation plans. Positive impacts include the restoration of the site to productive land use, the reduction of hazards, and aesthetic improvements. Negative impacts include a one-time loss of water and assignment of labor. The Surface Mining Control and Reclamation Act of 1977 provides a legal mandate for the statement. The summary includes a reference to the draft statement

  11. Regional Studies Program. Extraction of North Dakota lignite: environmental and reclamation issues

    Energy Technology Data Exchange (ETDEWEB)

    LaFevers, J.R.; Johnson, D.O.; Dvorak, A.J.

    1976-12-01

    This study, sponsored by the U.S. Energy Research and Development Administration, addresses the environmental implications of extraction of coal in North Dakota. These implications are supported by details of the geologic and historical background of the area of focus, the lignite resources in the Fort Union coalfield portion. The particular concentration is on the four-county area of Mercer, Dunn, McLean, and Oliver where substantial coal reserves exist and a potential gasification plant site has been identified. The purposes of this extensive study are to identify the land use and environmental problems and issues associated with extraction; to provide a base of information for assessing the impacts of various levels of extraction; to examine the economics and feasibility of reclamation; and to identify research that needs to be undertaken to evaluate and to improve reclamation practices. The study also includes a description of the physical and chemical soil characteristics and hydrological and climatic factors entailed in extraction, revegetation, and reclamation procedures.

  12. Engineering sustainable ecosystems: using GIS-based habitat modeling for oil sands mine reclamation and closure planning

    International Nuclear Information System (INIS)

    Seel, K.

    1997-01-01

    A GIS model was built to predict the climax vegetation habitat types on reclaimed mine surfaces in the Fort McMurray region of the Mid-Boreal Mixedwood Ecoregion of northwestern Alberta. Regional vegetation habitat types were classified by digital remote sensing using Landsat Thematic Mapper satellite data. Terrain data was derived from a high-resolution digital elevation model. The validated model was applied to the GIS database of Syncrude Canada's Mildred Lake Mine to predict future vegetation patterns based on the final closure mine surface. The results were compared to revegetation and closure plans created by experts to analyze performance and sustainability of reclamation efforts

  13. Review on the Significance of Local Plan for Coastal Reclamation Development: The Case of Malacca, Malaysia

    Directory of Open Access Journals (Sweden)

    Ishak Nor Syafa’ah

    2016-01-01

    Full Text Available A Development Plan acts as a planning and controlling instrument that helps to guide in decision making of current and future development. Therefore, in the Malaysian Town and Country Planning Act 1976 (Act 172, the provision of development plan from each level of the planning administration is stated in the Act under Section 6B till Section 16B. In examining the significance of one of the many development plans in Malaysia, i.e. the local plan, this paper therefore, focuses on the provision of a local plan by the Local Planning Authority (LPA of the said area. This paper, thus, aims to evaluate the Central Malacca Local Plan since Malacca is currently experiencing rapid growth in development along the coastal area. The primary data was obtained from interviews with the related planning authorities via face-to-face method. While, secondary data was gathered from related legal documents, policies and guidelines, as well as the existing development plan for the purpose of an in-depth data. Findings revealed incapability of the existing local plan to assist the development control in deciding the planning permission for reclaimed area. The existing local plan shows no zoning for coastal reclamation area because of the rapid growing development and time consuming procedure to amend the local plan according to the Act 172. In addition, the Act 172 and the process in amending the local plan should be more flexible and able to address the current issue efficiently. Finally, the paper concludes with a suggestion for further exploration in order to achieve an operative development process and functioning practice of the local plan.

  14. Henretta Creek reclamation project

    International Nuclear Information System (INIS)

    Pumphrey, J.F.

    2009-01-01

    Teck Coal Ltd. operates 6 open-pit coal mines, of which 5 are located in the Elk Valley in southeastern British Columbia. The Fording River Operations (FRO) began in 1971 in mining areas in Eagle Mountain, Turnbull Mountain and Henretta Valley. The recovery of approximately 5 million tons of coal from the Henretta Creek Valley posed significant challenges to mine planners, hydrologists and environmental experts because the coal had to be recovered from the valley flanks and also from under the main valley floor, on which the fish-bearing Henretta Creek runs. The Henretta Dragline Mining project was described along with the water control structures and fisheries management efforts for the cutthroat trout. A detailed Environmental Impact Assessment and Stage 1 mining report for the Henretta Valley area was completed in December 1990. FRO was granted a mining and reclamation permit in 1991. A temporary relocation of 1,270 metres was required in in April 1997 in order to enable mining on both sides and below the creek bed. Among the innovative construction techniques was a diversion of Henretta Creek through large diameter steel culverts and a specialized crossing of the creek to allow fish passage. The first water flowed through the reclaimed Henretta Creek channel in late 1998 and the first high flow occurred in the spring of 2000. Teck coal FRO then launched an annual fish and fish habitat monitoring program which focused on the Henretta Creek Reclaimed Channel and Henretta Lake. This document presented the results from the final year, 2006, and a summary of the 7 year aquatic monitoring program. It was concluded that from mining through to reclamation, the Henretta project shows the commitment and success of mining and reclamation practices at Teck Coal. Indicators of the project's success include riparian zone vegetation, fisheries re-establishment, aquatic communities and habitat utilization by terrestrial and avian species. 33 refs., 1 fig.

  15. Elliot Lake uranium mine reclamation, the first ten years

    International Nuclear Information System (INIS)

    Payne, R.A.

    2000-01-01

    In 1989, Rio Algom Limited finalized its plans for the closure and subsequent decommissioning of two of its then three operating mines in Elliot Lake as a result of market conditions. These two mines closed in August 1990. These mine closures had significant impacts. The principal mining operations of Rio Algom at that time were still in Elliot Lake and had been the very foundation of the company for about 40 years. The business impact on the Corporation was regarded as possibly severe. The resultant layoff of over 1,500 long-term, highly qualified, skilled and well-paid employees, a devastating blow to the affected employees and their families, would have a significant financial impact on the municipal economy, particularly as this announcement was seen as the first step in the early closure of all four operating mines in the region. At that time there was little precedence for such a high profile mine closure program and consequently the many unknowns relating to the mine decommissioning process, legislative requirements and society's expectations resulted in a perception of a significant yet ill-defined liability. In this atmosphere of understandable company, stakeholder and public concern, Rio Algom Limited embarked on what has turned out to be a long, rigorous, challenging yet ultimately reasonable and rewarding process of progressive reclamation of all its Elliot Lake mines, some ten in total (nine uranium, one copper). Over the past ten years, reclamation of all ten mines has been successfully completed, some $70 m plus has been expended in direct site reclamation works and the workforce has been reduced from over 2,500 to just 4. After ten years, the focus of attention is now on the long-term care, maintenance, monitoring and reporting required for the decommissioned mine sites, and the accomplishment of this in the best interests of all the stakeholders. (author)

  16. 30 CFR 746.13 - Decision document and recommendation on mining plan.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Decision document and recommendation on mining plan. 746.13 Section 746.13 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM REVIEW AND APPROVAL OF MINING PLANS § 746.13 Decision...

  17. Focus on land reclamation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-04-01

    Various aspects of land reclamation, i.e. returning disturbed land to a state where, at minimum, it is at least capable of supporting the same kinds of land uses as before the disturbance, are discussed. Activities which disturb the land such as surface mining of coal, surface mining and extraction of oil sands, drilling for oil and natural gas, waste disposal sites, including sanitary landfills, clearing timber for forestry, excavating for pipelines and transportation are described, along with land reclamation legislation in Alberta, and indications of future developments in land reclamation research, legislation and regulation. Practical guidelines for individuals are provided on how they might contribute to land reclamation through judicious and informed consumerism, and through practicing good land management, inclusive of reduced use of herbicides, composting of household wastes, and planting of native species or ground cover in place of traditional lawns.

  18. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  19. Achieving land use potential through reclamation

    International Nuclear Information System (INIS)

    1992-01-01

    Papers are presented under the headings: policy, rules and regulations; surface mine spoil and soil; wetlands technical division; forestry and wildlife technical division; abatement and treatment of acidic conditions; wetlands technical division; ecological evaluations of reclamation success; international tailing reclamation technical division; disposal and utilization of coal combustion residues; landscape architecture technical division; impacts and biological treatment of acidic drainage; reclamation with trees and woods shrubs; reclamation and restoration practices; and ultimate land use

  20. Review and critique of the US Department of Energy environmental program plan for site characterization for a high-level waste repository at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    1992-01-01

    This report provides a review and critique of the US Department of Energy (DOE) environmental program plan for site characterization activities at Yucca Mountain which principally addresses compliance with federal and state environmental regulation and to a lesser extent monitoring and mitigation of significant adverse impacts and reclamation of disturbed areas. There are 15 documents which comprise the plan and focus on complying with the environmental requirements of the Nuclear Waste Policy Act, as amended, (NWPA) and with single-media environmental statutes and their regulations. All elements of the plan follow from the 1986 statutory environmental assessment (EA) required by NWPA which concluded that no significant adverse impacts would result from characterization of the Yucca Mountain site. The lack of appropriate environmental planning and review for site characterization at Yucca Mountain points to the need for an oversight function by the State of Nevada. It cannot be assumed that on its own DOE will properly comply with environmental requirements, especially the substantive requirements that comprise the intent of NEPA. Thus, procedures must be established to assure that the environmental interests of the State are addressed in the course of the Yucca Mountain Project. Accordingly, steps will be taken by the State of Nevada to review the soundness and efficacy of the DOE field surveys, monitoring and mitigation activities, reclamation actions, and ecological impact studies that follow from the DOE environmental program plans addressed by this review

  1. Review and critique of the US Department of Energy environmental program plan for site characterization for a high-level waste repository at Yucca Mountain, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    This report provides a review and critique of the US Department of Energy (DOE) environmental program plan for site characterization activities at Yucca Mountain which principally addresses compliance with federal and state environmental regulation and to a lesser extent monitoring and mitigation of significant adverse impacts and reclamation of disturbed areas. There are 15 documents which comprise the plan and focus on complying with the environmental requirements of the Nuclear Waste Policy Act, as amended, (NWPA) and with single-media environmental statutes and their regulations. All elements of the plan follow from the 1986 statutory environmental assessment (EA) required by NWPA which concluded that no significant adverse impacts would result from characterization of the Yucca Mountain site. The lack of appropriate environmental planning and review for site characterization at Yucca Mountain points to the need for an oversight function by the State of Nevada. It cannot be assumed that on its own DOE will properly comply with environmental requirements, especially the substantive requirements that comprise the intent of NEPA. Thus, procedures must be established to assure that the environmental interests of the State are addressed in the course of the Yucca Mountain Project. Accordingly, steps will be taken by the State of Nevada to review the soundness and efficacy of the DOE field surveys, monitoring and mitigation activities, reclamation actions, and ecological impact studies that follow from the DOE environmental program plans addressed by this review.

  2. 30 CFR 942.800 - Bond and insurance requirements for surface coal mining and reclamation operations.

    Science.gov (United States)

    2010-07-01

    ... required for postmining water treatment must remain bonded. However, the trust fund or annuity may serve as... coal mining and reclamation operations. 942.800 Section 942.800 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING...

  3. Land reclamation on the Nevada Test Site: A field tour

    International Nuclear Information System (INIS)

    Winkel, V.K.; Ostler, W.K.

    1993-01-01

    An all-day tour to observe and land reclamation on the Nevada Test Site was conducted in conjunction with the 8th Wildland Shrub and Arid Land Restoration Symposium. Tour participants were introduced to the US Department of Energy reclamation programs for Yucca Mountain Site Characterization Project and Treatability Studies for Soil Media (TSSM) Project. The tour consisted of several stops that covered a variety of topics and studies including revegetation by seeding, topsoil stockpile stabilization, erosion control, shrub transplanting, shrub herbivory, irrigation, mulching, water harvesting, and weather monitoring

  4. 31 CFR 235.5 - Reclamation amounts.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Reclamation amounts. 235.5 Section 235.5 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE... ON DESIGNATED DEPOSITARIES § 235.5 Reclamation amounts. Amounts received by way of reclamation on...

  5. 43 CFR 404.36 - Will Reclamation reimburse me for the cost of an appraisal investigation or a feasibility study...

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Will Reclamation reimburse me for the cost... Reclamation reimburse me for the cost of an appraisal investigation or a feasibility study that was not...) or (b). Reclamation will not reimburse you or provide program funding for any expenses related to an...

  6. Access road reclamation

    International Nuclear Information System (INIS)

    Manson, T.; Blok, M.

    1997-01-01

    A general review of the measures involved in restoring abandoned access road sites in British Columbia was presented. Permits and licences are needed for the use of crown land for roads used by the petroleum and natural gas industry for exploration activities. However, the regulatory framework for road site reclamation is not well developed. The nature of access road reclamation is very site-specific. Some of the issues that are considered for all reclamation projects include slope stability, water control, revegetation, soil rehabilitation, access management and monitoring. The primary objective of reclaiming access road sites is to return the site to conditions that are equal or better than pre-disturbance conditions. Restoration measures must be approved by BC Environment and by the Department of Fisheries and Oceans where federal fisheries responsibilities are involved. 54 refs., 5 tabs., 3 figs

  7. Land reclamation in the North Bohemian Brown Coal Mines and its effect on the environment

    International Nuclear Information System (INIS)

    Sixta, J.

    1991-01-01

    Land reclamation actually begins the moment the opening of a new mine is planned. The following basic characteristics of the future landscape are decided on: the shape and size of outer waste dumps, location, shape and size of the remaining pit, ground modeling with respect to the airing of the territory and outflow of surface waters, and balance and exploitation of earth that can be made into arable land as well as of other resources. The success of the further use of the territory primarily depends on the mining-technical stage of the land reclamation activity. The biotechnical stage begins after closing the mine. This stage includes the supply of topsoil, a special 5-8 year sowing procedure, planting, etc. The post-reclamation stage, whose aim it is to sustain the desired pedogenetic development, is provided by the subsequent users of the reclaimed plots. The reclamation costs are included in the current mining costs. A detailed discussion is devoted to the economic and legal aspects of the future of reclamation activities. (M.D.). 2 tabs

  8. 30 CFR 874.13 - Reclamation objectives and priorities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation objectives and priorities. 874.13... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.13 Reclamation objectives...)(2)(ii) of this section. (b) This paragraph applies to State or Tribal share funds available under...

  9. Mechanization for Optimal Landscape Reclamation

    Science.gov (United States)

    Vondráčková, Terezie; Voštová, Věra; Kraus, Michal

    2017-12-01

    Reclamation is a method of ultimate utilization of land adversely affected by mining or other industrial activity. The paper explains the types of reclamation and the term “optimal reclamation”. Technological options of the long-lasting process of mine dumps reclamation starting with the removal of overlying rocks, transport and backfilling up to the follow-up remodelling of the mine dumps terrain. Technological units and equipment for stripping flow division. Stripping flow solution with respect to optimal reclamation. We recommend that the application of logistic chains and mining simulation with follow-up reclamation to open-pit mines be used for the implementation of optimal reclamation. In addition to a database of local heterogeneities of the stripped soil and reclaimed land, the flow of earths should be resolved in a manner allowing the most suitable soil substrate to be created for the restoration of agricultural and forest land on mine dumps. The methodology under development for the solution of a number of problems, including the geological survey of overlying rocks, extraction of stripping, their transport and backfilling in specified locations with the follow-up deployment of goal-directed reclamation. It will make possible to reduce the financial resources needed for the complex process chain by utilizing GIS, GPS and DGPS technologies, logistic tools and synergistic effects. When selecting machines for transport, moving and spreading of earths, various points of view and aspects must be taken into account. Among such aspects are e.g. the kind of earth to be operated by the respective construction machine, the kind of work activities to be performed, the machine’s capacity, the option to control the machine’s implement and economic aspects and clients’ requirements. All these points of view must be considered in the decision-making process so that the selected machine is capable of executing the required activity and that the use of an

  10. Clean Slate 1 revegetation and monitoring plan

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim cleanup of radionuclide-contaminated surface soil at the Clean Slate 1 site (located on the Tonopah Test Range). This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the Double Tracks cleanup site in the fall of 1994 to evaluate the performance of several native plant species and to evaluate different irrigation strategies. Results of that study, and the results from numerous other studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the cleanup of the Clean Slate 1 site. The plan also contains procedures for monitoring both short-term and long-term reclamation

  11. Boric Acid Reclamation System (BARS)

    International Nuclear Information System (INIS)

    Kniazewycz, B.G.; Markind, J.

    1986-01-01

    KLM Technologies was recently awarded a contract by the Department of Energy for a Phase II demonstration of an optimized full-scale prototype membrane system including performance evaluation under plant operating conditions. The program will serve as the catalyst for developing technology to augment the industry's incentive toward innovative and compact volume reduction alternatives for PWRs. The development and demonstration of the KLM Boric Acid Reclamation System, which is readily retrofitted into existing PWR facilities, will provide a positive means of reducing PWR waste volumes without requiring the $25-50 million equipment and support facility expenditures associated with most liquid waste volume reduction systems. This new application for membrane separation technology can reduce waste by upward of 50 percent for two-thirds of the operating nuclear plants in the U.S. The use of membrane technology has demonstrated significant process potential in radwaste and related applications. Reverse Osmosis (RO) and Ultrafiltration (UF) can provide selective filtration capability and concentrate contaminants without the need of filter aids, thus minimizing the requirements of chemical regeneration, costly resins, and major process equipment with large auxiliary heat supplies. KLM Technologies' personnel have identified a Boric Acid Reclamation System (BARS) utilizing RO and UF to produce a recyclable grade of otherwise waste boric acid at PWRs, thus reducing a major source of low-level radwaste. The design of a prototype BARS as a compact volume reduction system was the result of KLM's Phase I Program, and based upon a preliminary feasibility program, which assessed the applicability of membrane technology to refurbish and recycle waste boric acid from floor and equipment drain streams. The analysis of the overall program indicated a substantial savings regarding off-site disposal costs

  12. 43 CFR 422.3 - Reclamation law enforcement policy.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement policy. 422.3 Section 422.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement...

  13. CURRENT STATUS AND RECLAMATION PLAN OF FORMER URANIUM MINING AND MILLING FACILITIES AT NINGYO-TOGE IN JAPAN

    International Nuclear Information System (INIS)

    Sato, Kazuhiko; Tokizawa, Takayuki

    2003-01-01

    The Japan Nuclear Cycle Development Institute (JNC) conducted research and development projects on uranium exploration in Japan from 1956 to 1987. Several mine facilities, such as waste rock yards and a mill tailing pond, were retained around Ningyo-toge after the projects ended. Although there is no legal issue in the mine in accordance with related law and agreements at present, JNC has a notion that it is important to reduce the burden of waste management on future generations. Thus, the Ningyo-toge Environmental Engineering Center of JNC proposed a reclamation plan for these facilities with fundamental policy, an example of safety analysis and timetables. The plan has mainly three phases: Phase I is the planning stage, and this paper corresponds to this: Phase II is the stage to perform various tests for safety analysis and site designing: Phase III is the stage to accomplish measures. Preliminarily safety analyses suggested that our supposed cover designs for both waste rock and m ill tailing are enough to keep dose limit of 1mSv/y at site boundaries. The plan is primarily based on the Japanese Mine Safety Law, also refers to ICRP recommendations, IAEA reports, measures implemented overseas, etc. because this is the first case in Japan. For the accomplishment of this plan, it is important to establish a close relationship with local communities and governments, and to maintain a policy of open-to-public

  14. An introduction to conservation and reclamation at Alberta's mineable oil sands

    Energy Technology Data Exchange (ETDEWEB)

    Richens, T. [Alberta Environment, Edmonton, AB (Canada)

    2009-07-01

    This paper presented a balanced view of the conservation and reclamation issues and challenges facing oil sands development in Alberta. Bitumen is recovered by truck and shovel in the shallow oil sands of the Athabasca region. The deeper deposits in the Athabasca, Peace River and Cold Lake regions are accessed primarily using a system of horizontal wells and steam to extract the bitumen from the sand and pump it to the surface. Individual in-situ operations have a smaller environmental impact than mines, and do not produce tailings ponds. However, the footprint of in-situ facilities will accumulate over time because of the potential for extensive future development. The key issues facing conservation and reclamation in the mineable oil sands were discussed. Summary statistics on land disturbed and reclaimed in the region were also provided. The challenges facing reclamation activities include long timeframes; large scale, regional planning and integration; competing land use goals; revegetation; byproduct management; and tailings and process-affected water. Multi-stakeholder forums have proven to be the key to the progression of monitoring, research and development and the sharing of knowledge and information. Frameworks have been developed for the assessment of pre-disturbed and reclaimed soil capability specific to the oil sands region. Additional resources are also available, such as guidelines for the reclamation of terrestrial and wetland habitats that represent the best management practices for reclamation research in revegetation, soil salvage, stockpiling and placement, tailings reclamation, end pit lakes, wetlands and biodiversity. 16 refs., 1 fig.

  15. Plutonium--uranium partitioning; alternate flowsheet Plutonium Reclamation Facility. [SEPHIS

    Energy Technology Data Exchange (ETDEWEB)

    Fort, L.A.

    1975-12-01

    The SEPHIS computer program was used to predict the transient and steady-state concentrations in a stage-wise scheme for the Pu reclamation solvent extraction system. With the aid of the computer an alternative flowsheet for Pu--U partitioning was constructed. The goal of the alternative program is to reduce Pu losses from the initial stripping column and reduce the quantity of Pu-bearing wastes from the solvent extraction system. (JSR)

  16. 30 CFR 784.23 - Operation plan: Maps and plans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Maps and plans. 784.23 Section... PLAN § 784.23 Operation plan: Maps and plans. Each application shall contain maps and plans as follows... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  17. Clean Slate 1 revegetation and monitoring plan

    International Nuclear Information System (INIS)

    Anderson, D.C.; Hall, D.B.

    1997-07-01

    This document constitutes a reclamation plan for the short-term and long-term stabilization of land disturbed by activities associated with the cleanup of radionuclide contaminated surface soil at the Clean Slate 1 site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. The results of reclamation trials at Area 11, Area 19 and more recently the reclamation demonstration plots at the Double Tracks cleanup site, have been summarized and incorporated into this reclamation and monitoring plan. The plan also contains procedures for monitoring both the effectiveness and success of short-term and long-term soil stabilization. The Clean Slate 1 site is located on the Tonopah Test Range. The surface soils were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation

  18. Factors of Reclamation Success at the Lignite Strip-Mined Land in Northern Greece

    Directory of Open Access Journals (Sweden)

    Thomas Panagopoulos

    2013-06-01

    Full Text Available The adverse ecological conditions at the lignite mines of Ptolemaida make the landscape reclamation difficult. The naturally established vegetation and soil properties were studied prior to reclamation. Various forest species were planted to assess the afforestation potential. The natural vegetation was heterogeneous but can be used for the analysis of the site. The soil of the spoil heaps was heterogeneous with unfavourable physicochemical properties. Surface soil temperature was still 24º C higher in bare soil than in soil covered with vegetation. The most successful species of the afforestation trial were Robinia pseudoacacia and Cedrus atlantica. Covering of fly ash spoils with topsoil presented poor results, while sewage sludge gave a favorable amelioration response in areas with high fly ash content. Topsoil from older stands was the suggested method to establish Robinia pseudoacacia. Reclamation success was dependent on appropriate planning; thus, the new landscape had to be designed in harmony with the surrounding landscape before the start of the mining activity.

  19. Different effect of mycorrhizal inoculation in direct and indirect reclamation of spoil banks

    Czech Academy of Sciences Publication Activity Database

    Rydlová, Jana; Püschel, David; Vosátka, Miroslav; Charvátová, K.

    2008-01-01

    Roč. 82, č. 1 (2008), s. 15-20 ISSN 1613-9216 R&D Projects: GA MŠk 1M0571 Institutional research plan: CEZ:AV0Z60050516 Keywords : arbuscular mycorrhizal fungi * inoculum * reclamation Subject RIV: EF - Botanics Impact factor: 0.482, year: 2008

  20. Staunton 1 Reclamation Demonstration Project. Progress report II

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process on a 13.8-ha abandoned deep coal mine refuse site in southwestern Illinois. The procedure included collection of preconstruction environmental data, determination of the site's final land use, and development and implementation of a detailed site development plan. Approximately 9.3 ha of refuse material was recontoured, covered with a minimum of 30 cm of soil obtained on site, and seeded with a mixture of grasses and legumes. Hydrologic investigation indicates some improvement in groundwater quality. Surface water quality also has shown improvement, but development of the aquatic ecosystem in the newly-constructed pond is slow. Revegetation has been successful, and a protective plant cover has been established on most areas of the site. Soil tests indicate that acceptable plant growth media have been constructed; however, continued application of fertilizer and limestone will probably be necessary to maintain the vegetation. The soil microbial community has achieved total numbers equal to those of old fields, but species' diversity is low. Small mammals, birds, reptiles, and amphibians have invaded and are utilizing the site. The economic value of the site and adjacent property has increased substantially, and the area's aesthetic value has been enhanced significantly. The two-year period of intensive monitoring and evaluation has been utilized to develop recommendations for improving the designs of future reclamation efforts.

  1. 30 CFR 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles.

    Science.gov (United States)

    2010-07-01

    ... is capable of being done after consideration of cost, logistics, and available technology. The fact... COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan...

  2. 30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.

    Science.gov (United States)

    2010-07-01

    ... of being done after consideration of cost, logistics, and available technology. The fact that one... COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan...

  3. Land reclamation and artificial islands: Walking the tightrope between development and conservation

    Directory of Open Access Journals (Sweden)

    Su Yin Chee

    2017-10-01

    Full Text Available Coastal developments worldwide have put entire shoreline ecosystems at risk. Recently, land reclamation has been extended to the construction of whole new islands; a phenomenon that is particularly common in Asia and the Middle East and is recognised as a global conservation issue. Using Penang Island, Malaysia as a case study, we illustrate the relationship between rapid population growth and the simultaneous increase in urbanisation, land reclamation and extent of artificial shorelines; and decrease in the quality and extent of natural coastal habitats. Our goal was to provide an up-to-date assessment of the state of coastal habitats around Penang, identify knowledge gaps and identify locations that may be potentially suitable for eco-engineering. Comparisons of historical and current topographic maps revealed that land formerly consisting of coastal swamp and forest, mangrove forests, sandy beaches, and rubber and oil plantations have been lost to large-scale land reclamation and urbanisation. Between 1960 and 2015, there were increases in urbanised area, reclaimed land, and artificial shoreline extent. The total extent of mangrove forests has remained relatively stable but this balance is characterised by significant losses on the east coast coupled with increases on the west coast. Coastal development on the island is still on-going with plans for the construction of five artificial islands and another two coastal reclamation projects are either underway or scheduled for the near future. If the plans for future land reclamations are fully realized, 32.3 km2 of the 321.8 km2 island (10% will be reclaimed land and the associated negative effects on the island’s natural coastal habitats will be inevitable. This study highlights sections of the coast of Penang Island in need of effective monitoring, conservation and management and explores the possibility of incorporating ecological engineering into development projects, either

  4. Reclamation project at an abandoned deep mine

    Energy Technology Data Exchange (ETDEWEB)

    Wilkey, M.; Zellmer, S.

    1978-01-01

    The total reclamation of any site requires time, physical control of the site, favorable natural conditions, and a considerable capital investment. It must be realized that processes involving biological systems require time to become established and self-sustaining. The Staunton 1 project has been designed to provide data on many aspects of the reclamation process. Data collected to date indicate a significant improvement in overall environmental quality, a substantial increase in the economic potential of the site and adjacent properties, and a genuine enhancement of the entire area's aesthetic value. The Staunton 1 Reclamation Demonstration Project, in addition to reclaiming this one site, will provide the necessary design data for future reclamation efforts of this type.

  5. Ecological Aspects of the Performed Thermal Reclamation

    Directory of Open Access Journals (Sweden)

    Łucarz M.

    2015-04-01

    Full Text Available The thermal analysis results of the selected group of binders and the thermal reclamation of one spent moulding sand with organic binder, are presented in the paper. The reclaiming process of the quartz matrix was performed on the basis of the own method of selecting the reclamation temperature. Taking into account thermogravimetric (TG analysis results of the binder, the temperature range - required for performing the efficient reclamation of spent moulding sand containing this binder - was indicated. In order to confirm the assumptions, the thermal reclamation operations were carried out at a temperature similar to the determined on the TG basis and - for comparisons - at lower and higher temperatures. During the reclamation operation the reclaim samples were taken for the loss on ignition testing, aimed at the determination of the process efficiency. Temperature in the reclaimer chamber and gas consumptions were also recorded. On the bases of the thermal analyses, loss on ignition, gas consumption and temperatures of the reclaimed moulding sand bed the recommendations for the realisation of the thermal reclamation were given. These recommendations will allow a better, than currently available, process control in an aspect of decreasing the pyrolysis effect and limiting the emission of substances harmful for the environment.

  6. Grande Ronde Model Watershed Program Administration and Habitat Projects, Annual Progress Report, Project Period: Program Administration: January 1, 1997 - December 31, 1997 Habitat Projects: January 1, 1997 - March 31, 1998.

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, Cecilia; Kuchenbecker, Lyle; Perry, Patty

    1998-10-28

    This agreement provided funding for operation and administration of the Grande Ronde Model Watershed Program including staffing of an Executive Director, Program Planner, and clerical personnel. The contract covers maintaining program services, project planning, subwatershed plans (CRMP's), public involvement and education, interagency coordination/clearing house, monitoring, and technical support activities that have taken place in the Grande Ronde basin. Cost-share has been received from the Bureau of Reclamation and the Governor's Watershed Enhancement Board.

  7. Oil sands terrestrial habitat and risk modeling for disturbance and reclamation - Phase I report

    Energy Technology Data Exchange (ETDEWEB)

    Welham, C. [FORRx Consulting Inc., Belcarra, BC (Canada)

    2010-11-15

    The main purpose of this study is to build a framework that includes risk management and strategic decision-making to assess the impact of natural and industrial disturbance on ecosystem products and services and on the existence of habitat for terrestrial species in Alberta's Lower Athabasca planning region. This will include an evaluation of the impact of disturbance, conservation and reclamation activities associated with oil sands development both at the lease and regional levels. The basecase scenario, established in Phase I, includes a dendrochronology study of the link between climate and tree growth in the sub boreal region that comprises oil sands mining, an analysis of habitat availability for 10 wildlife species compared with reclamation activities on the Kearl Lake mine, and an examination of the potential for development of high levels of water stress in recent reclamation plantations at the Kearl Lake mine. Four tree species of the subboreal forests of Alberta and Saskatchewan were considered for the dendrochronology study: the white spruce or Picea glauca, the black spruce or Picea mariana, the jack pine or Pinus banksiana, and the trembling aspen or Populus tremuloides. This study shows that the water stress observed during the year has restricted the radial growth of white spruce and a link has been established between radial growth and increasing season precipitation and summer temperatures. The purposes of the habitat suitability analysis were to list habitats suitability models that could be applied to Alberta boreal forests, distinguish the parameters used in those models that can be simulated with an ecosystem simulation model, simulate the reclamation prescriptions detailed in the Kearl Lake EIA documents with the ecosystem simulation model and generate output suitable for populating each habitat suitability model. The establishment of ecologically viable reclamation plans in the oil sands region can be hard to manage regarding the

  8. Inventory of past DOE land disturbance, Yucca Mountain, Nevada, and estimated general reclamation costs

    International Nuclear Information System (INIS)

    1989-04-01

    Since 1976, DOE preliminary investigations for a high level nuclear waste repository at Yucca Mountain, Nevada, have caused widespread disturbances of the landscape. This report addresses the areal extent of those disturbances that have accrued up to June 1988, and identifies expected associated reclamation costs. It was first necessary to identify disturbances, next to classify them for reclamation purposes, and, then, to assign general reclamation costs. The purposes of the analysis were: (1) to establish the amount of disturbance that already exists in the area of Yucca Mountain in order to identify alterations of the landscape that comprise the existing baseline conditions; (2) to identify estimated general reclamation costs for repair of the disturbances; (3) to provide information needed to establish disturbance models, and eventually environmental impact models, that can be applied to future DOE activities during Site Characterization and later phases of repository development, if they occur, and (4) to provide indicators of the needs for reclamation of future disturbances created by DOE's Site Characterization program. Disturbances were estimated using measurements from June 1988, large scale color aerial photography. Two reconnaissance site visits were also conducted. The identified disturbance totals by type are displayed in tabular form in the appendices. 84 refs., 2 figs., 9 tabs

  9. The Karvina Township reclamation concept

    International Nuclear Information System (INIS)

    Nemec, J.; Orsag, H.; Dirner, V.

    1997-01-01

    The paper contains a summary of all reclamation activities in the Karvina township territory, Czech Republic, including those completed, those being worked at, and those under preparation. All projects are connected with changes of the landscape due to coal extraction. The landscape reclamation requires a certain volume of mine waste and of soil. The policy, as presented in this paper, has been submitted for approval by the Municipal Council

  10. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  11. Comparing effects of land reclamation techniques on water pollution and fishery loss for a large-scale offshore airport island in Jinzhou Bay, Bohai Sea, China.

    Science.gov (United States)

    Yan, Hua-Kun; Wang, Nuo; Yu, Tiao-Lan; Fu, Qiang; Liang, Chen

    2013-06-15

    Plans are being made to construct Dalian Offshore Airport in Jinzhou Bay with a reclamation area of 21 km(2). The large-scale reclamation can be expected to have negative effects on the marine environment, and these effects vary depending on the reclamation techniques used. Water quality mathematical models were developed and biology resource investigations were conducted to compare effects of an underwater explosion sediment removal and rock dumping technique and a silt dredging and rock dumping technique on water pollution and fishery loss. The findings show that creation of the artificial island with the underwater explosion sediment removal technique would greatly impact the marine environment. However, the impact for the silt dredging technique would be less. The conclusions from this study provide an important foundation for the planning of Dalian Offshore Airport and can be used as a reference for similar coastal reclamation and marine environment protection. Crown Copyright © 2013. Published by Elsevier Ltd. All rights reserved.

  12. Influence of land reclamation on the status of groundwater in ...

    African Journals Online (AJOL)

    Influence of land reclamation on the status of groundwater in Borokiri area of Port Harcourt, Niger Delta, Nigeria. ... The resulting resistivity data were iterated using a RES2DINV Computer Program. The results were used to map the quality potential of groundwater in the area. The results of the mapping process indicate that ...

  13. Used Furan Sand Reclamation in REGMAS Vibratory Unit

    Directory of Open Access Journals (Sweden)

    Dańko J.

    2015-09-01

    Full Text Available The paper, especially dealt with problems of reclamation of used furan sand, carried out in new, vibratory sand reclamation unit REGMAS developed by researches from AGH-University of Science and Technology, Faculty of Foundry Engineering in Cracow (Poland. Functional characteristics of reclamation unit as well as the results of reclamation of used sand with furfuryl resin are discussed in the paper. The quality of reclaim was tested by means of the LOI and pH value, dust content in the reclaim and at least by the the quality of the castings produced in moulds prepared with the use of reclaimed matrix.

  14. Reclamation of slopes left after surface mining

    Energy Technology Data Exchange (ETDEWEB)

    Zmitko, J [Banske Projekty, Teplice (Czech Republic)

    1993-03-01

    Discusses land reclamation of abandoned slopes from brown coal surface mining in the North Bohemian brown coal basin in the Czech Republic. Problems associated with reclamation of landslide areas in two former coal mines are evaluated: the Otokar mine in Kostany (mining from 1956 to 1966) and the CSM mine in Pozorka (mining from 1955 to 1967). Land reclamation was introduced 25 years after damage occurred. The following aspects are analyzed: hydrogeologic conditions, range of landslides, types of rocks in landslide areas, water conditions, methods for stabilizing slopes, safety aspects.

  15. 43 CFR 423.38 - Operating vessels on Reclamation waters.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Operating vessels on Reclamation waters... WATERBODIES Rules of Conduct § 423.38 Operating vessels on Reclamation waters. (a) You must comply with... Reclamation waters, and with any restrictions established by an authorized official. (b) You must not operate...

  16. Cover systems in the Athabasca oil sands : a summary of the Green Bullet and ten years of reclamation research at Syncrude Canada Ltd.

    Energy Technology Data Exchange (ETDEWEB)

    O' Kane, M. [O' Kane Consultants Inc., Calgary, AB (Canada)

    2010-02-15

    This PowerPoint presentation discussed the use of a dry cover system over oil sand tailings as land reclamation strategy. Dry covers can range from a single layer of earthen material to several layers of different material types, including native soils, non-reactive tailings or waste rock, geosynthetic materials, and oxygen consuming organic materials. The 3 prototype covers used in the Athabasca deposit in northern Alberta include peat, glacial till and sedge-sphagnum open bog (SSOB). The hydraulic role of the covers was described. This presentation also described how the physical reclamation works, with particular reference to how the area is contoured to ensure proper drainage. Soil and vegetation assessments are undertaken to ensure the reclamation amendments are achieving the goals of the reclamation plan. tabs., figs.

  17. Cover systems in the Athabasca oil sands : a summary of the Green Bullet and ten years of reclamation research at Syncrude Canada Ltd

    International Nuclear Information System (INIS)

    O'Kane, M.

    2010-01-01

    This PowerPoint presentation discussed the use of a dry cover system over oil sand tailings as land reclamation strategy. Dry covers can range from a single layer of earthen material to several layers of different material types, including native soils, non-reactive tailings or waste rock, geosynthetic materials, and oxygen consuming organic materials. The 3 prototype covers used in the Athabasca deposit in northern Alberta include peat, glacial till and sedge-sphagnum open bog (SSOB). The hydraulic role of the covers was described. This presentation also described how the physical reclamation works, with particular reference to how the area is contoured to ensure proper drainage. Soil and vegetation assessments are undertaken to ensure the reclamation amendments are achieving the goals of the reclamation plan. tabs., figs.

  18. Regional Cost Estimates for Reclamation Practices on Arid and Semiarid Lands; TOPICAL

    International Nuclear Information System (INIS)

    W. K. Ostler

    2002-01-01

    The U.S. Army uses the Integrated Training Area Management program for managing training land. One of the major objectives of the Integrated Training Area Management program has been to develop a method for estimating training land carrying capacity in a sustainable manner. The Army Training and Testing Area Carrying Capacity methodology measures training load in terms of Maneuver Impact Miles. One Maneuver Impact Mile is the equivalent impact of an M1A2 tank traveling one mile while participating in an armor battalion field training exercise. The Army Training and Testing Area Carrying Capacity methodology is also designed to predict land maintenance costs in terms of dollars per Maneuver Impact Mile. The overall cost factor is calculated using the historical cost of land maintenance practices and the effectiveness of controlling erosion. Because land maintenance costs and effectiveness are influenced by the characteristics of the land, Army Training and Testing Area Carrying Capacity cost factors must be developed for each ecological region of the country. Costs for land maintenance activities are presented here for the semiarid and arid regions of the United States. Five ecoregions are recognized, and average values for reclamation activities are presented. Because there are many variables that can influence costs, ranges for reclamation activities are also presented. Costs are broken down into six major categories: seedbed preparation, fertilization, seeding, planting, mulching, and supplemental erosion control. Costs for most land reclamation practices and materials varied widely within and between ecological provinces. Although regional cost patterns were evident for some practices, the patterns were not consistent between practices. For the purpose of estimating land reclamation costs for the Army Training and Testing Area Carrying Capacity methodology, it may be desirable to use the ''Combined Average'' of all provinces found in the last row of each table

  19. Multi-Year Program Plan - Building Regulatory Programs

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2010-10-01

    This document presents DOE’s multi-year plan for the three components of the Buildings Regulatory Program: Appliance and Equipment Efficiency Standards, ENERGY STAR, and the Building Energy Codes Program. This document summarizes the history of these programs, the mission and goals of the programs, pertinent statutory requirements, and DOE’s 5-year plan for moving forward.

  20. International Photovoltaic Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    The International Photovoltaics Program Plan is in direct response to the Solar Photovoltaic Energy Research, Development, and Demonstration Act of 1978 (PL 95-590). As stated in the Act, the primary objective of the plan is to accelerate the widespread use of photovoltaic systems in international markets. Benefits which could result from increased international sales by US companies include: stabilization and expansion of the US photovoltaic industry, preparing the industry for supplying future domestic needs; contribution to the economic and social advancement of developing countries; reduced world demand for oil; and improvements in the US balance of trade. The plan outlines programs for photovoltaic demonstrations, systems developments, supplier assistance, information dissemination/purchaser assistance, and an informaion clearinghouse. Each program element includes tactical objectives and summaries of approaches. A program management office will be established to coordinate and manage the program plan. Although the US Department of Energy (DOE) had the lead responsibility for preparing and implementing the plan, numerous federal organizations and agencies (US Departments of Commerce, Justice, State, Treasury; Agency for International Development; ACTION; Export/Import Bank; Federal Trade Commission; Small Business Administration) were involved in the plan's preparation and implementation.

  1. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  2. Piping research program plan

    International Nuclear Information System (INIS)

    1988-09-01

    This document presents the piping research program plan for the Structural and Seismic Engineering Branch and the Materials Engineering Branch of the Division of Engineering, Office of Nuclear Regulatory Research. The plan describes the research to be performed in the areas of piping design criteria, environmentally assisted cracking, pipe fracture, and leak detection and leak rate estimation. The piping research program addresses the regulatory issues regarding piping design and piping integrity facing the NRC today and in the foreseeable future. The plan discusses the regulatory issues and needs for the research, the objectives, key aspects, and schedule for each research project, or group of projects focussing of a specific topic, and, finally, the integration of the research areas into the regulatory process is described. The plan presents a snap-shot of the piping research program as it exists today. However, the program plan will change as the regulatory issues and needs change. Consequently, this document will be revised on a bi-annual basis to reflect the changes in the piping research program. (author)

  3. Waste acid detoxification and reclamation

    International Nuclear Information System (INIS)

    Brouns, T.M.; Stewart, T.L.

    1988-01-01

    Economically feasible processes that reduce the volume, quantity, and toxicity of metal-bearing waste acids by reclaiming, reusing, and recycling spent acids and metal salts are being developed and demonstrated. The acids used in the demonstrations are generated during metal-finishing operations used in nuclear fuel fabrication; HF-HNO 3 , HNO 3 , and HNO 3 -H 2 SO 4 wastes result from Zr etching, Cu stripping, and chemical milling of U. At discharge, wastes contain high concentrations of acid and one major metal impurity. The waste minimization process used to reclaim acid from these three streams incorporates three processes for acid regeneration and reclamation. Normally, HNO 3 remains in the bottoms when an aqueous acid solution is distilled; however, in the presence of H 2 SO 4 , HNO 3 will distill to the overhead stream. In this process, nitrates and fluorides present as free acid and metal salts can be reclaimed as acid for recycle to the metal-finishing processes. Uranium present in the chemical milling solution can be economically recovered from distillation bottoms and refined. Using acid distillation, the volume of chemical milling solution discharged as waste can be reduced by as much as 60% depending on the H 2 SO 4 concentration. A payback period of 2.2 years has been estimated for this process. The development and demonstration of precipitation and distillation processes for detoxification and reclamation of waste acid is supported by the US Department of Energy's Hazardous Waste Remedial Actions Program (HAZWRAP)

  4. U.S. Department of Energy Office of Legacy Management Legacy Uranium Mine Site Reclamation - Lessons Learned - 12384

    Energy Technology Data Exchange (ETDEWEB)

    Kilpatrick, Laura E. [U.S. Department of Energy Office of Legacy Management, Westminster, Colorado 80021 (United States); Cotter, Ed [S.M. Stoller Corporation, Grand Junction, Colorado 81503 (United States)

    2012-07-01

    The U.S. Department of Energy (DOE) Office of Legacy Management is responsible for administering the DOE Uranium Leasing Program (ULP) and its 31 uranium lease tracts located in the Uravan Mineral Belt of southwestern Colorado (see Figure 1). In addition to administering the ULP for the last six decades, DOE has also undertaken the significant task of reclaiming a large number of abandoned uranium (legacy) mine sites and associated features located throughout the Uravan Mineral Belt. In 1995, DOE initiated a 3-year reconnaissance program to locate and delineate (through extensive on-the-ground mapping) the legacy mine sites and associated features contained within the historically defined boundaries of its uranium lease tracts. During that same time frame, DOE recognized the lack of regulations pertaining to the reclamation of legacy mine sites and contacted the U.S. Bureau of Land Management (BLM) concerning the reclamation of legacy mine sites. In November 1995, The BLM Colorado State Office formally issued the United States Department of the Interior, Colorado Bureau of Land Management, Closure/Reclamation Guidelines, Abandoned Uranium Mine Sites as a supplement to its Solid Minerals Reclamation Handbook (H-3042-1). Over the next five-and-one-half years, DOE reclaimed the 161 legacy mine sites that had been identified on DOE withdrawn lands. By the late 1990's, the various BLM field offices in southwestern Colorado began to recognize DOE's experience and expertise in reclaiming legacy mine sites. During the ensuing 8 years, BLM funded DOE (through a series of task orders) to perform reclamation activities at 182 BLM mine sites. To date, DOE has reclaimed 372 separate and distinct legacy mine sites. During this process, DOE has learned many lessons and is willing to share those lessons with others in the reclamation industry because there are still many legacy mine sites not yet reclaimed. DOE currently administers 31 lease tracts (11,017 ha) that

  5. Equipment qualification research program: program plan

    International Nuclear Information System (INIS)

    Dong, R.G.; Smith, P.D.

    1982-01-01

    The Lawrence Livermore National Laboratory (LLNL) under the sponsorship of the US Nuclear Regulatory Commission (NRC) has developed this program plan for research in equipment qualification (EQA). In this report the research program which will be executed in accordance with this plan will be referred to as the Equipment Qualification Research Program (EQRP). Covered are electrical and mechanical equipment under the conditions described in the OBJECTIVE section of this report. The EQRP has two phases; Phase I is primarily to produce early results and to develop information for Phase II. Phase I will last 18 months and consists of six projects. The first project is program management. The second project is responsible for in-depth evaluation and review of EQ issues and EQ processes. The third project is responsible for detailed planning to initiate Phase II. The remaining three projects address specific equipment; i.e., valves, electrical equipment, and a pump

  6. Planning integration FY 1996 program plan. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M ampersand I) contract

  7. A decision support system using analytical hierarchy process (AHP) for the optimal environmental reclamation of an open-pit mine

    Science.gov (United States)

    Bascetin, A.

    2007-04-01

    The selection of an optimal reclamation method is one of the most important factors in open-pit design and production planning. It also affects economic considerations in open-pit design as a function of plan location and depth. Furthermore, the selection is a complex multi-person, multi-criteria decision problem. The group decision-making process can be improved by applying a systematic and logical approach to assess the priorities based on the inputs of several specialists from different functional areas within the mine company. The analytical hierarchy process (AHP) can be very useful in involving several decision makers with different conflicting objectives to arrive at a consensus decision. In this paper, the selection of an optimal reclamation method using an AHP-based model was evaluated for coal production in an open-pit coal mine located at Seyitomer region in Turkey. The use of the proposed model indicates that it can be applied to improve the group decision making in selecting a reclamation method that satisfies optimal specifications. Also, it is found that the decision process is systematic and using the proposed model can reduce the time taken to select a optimal method.

  8. Program Planning in Health Professions Education

    Science.gov (United States)

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  9. The state of oil sands wetland reclamation

    Energy Technology Data Exchange (ETDEWEB)

    Foote, L. [Alberta Univ., Edmonton, AB (Canada)

    2010-07-01

    The state of oil sand and wetlands reclamation was the subject of this presentation. Wildlife habitat and response, plant community and production, and microbial biology were examples of research areas surrounding this body of knowledge. Hydrological research and landscape ecology were discussed along with peatlands and marshes such as the Corvette and the Kia. A few examples of what has been learned in the area of wetlands reclamation was presented. Other topics were also discussed, such as timeframes, pragmatic policy approaches, reclamation costs, research needs and some ideas on maturing the field. It was concluded that environmental conditions change with time and area because of time, chemistry, physics, stoichiometry, as well as biotic mediation and facilitation. figs.

  10. Fiscal year 1987 program plan

    International Nuclear Information System (INIS)

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research ampersand Development (R ampersand D), the organizational interfaces and communication channels for R ampersand D and the establishment of procedures for planning, reporting, and budgeting of Operations and R ampersand D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years

  11. Blasting as a method for abandoned mine land reclamation

    International Nuclear Information System (INIS)

    Workman, J.L.; Fletcher, L.R.

    1991-01-01

    Blasting methods have been proposed for reclaiming abandoned underground coal mine sites having unstable conditions. The objective of blasting is twofold: the permanent stabilization of an area by the collapse of underground workings to prevent any future subsidence, and the use of blasting to close existing sinkholes. This paper presents the results of two research projects funded by the Bureau of Mines Abandoned Mine Land Research Program to investigate the feasibility of blasting to assist in the reclamation of shallow abandoned coal mine sites. Blasting tests were conducted at Beulah, North Dakota and at Scobey, Montana, involving different configurations. The first test was a 10-acre site where blasting was used to collapse regular room and pillar panels for which good mine layout information was available. The second test involved a one acre site containing very irregular workings for which there was little available information. Finally, blasting techniques were used to close 13 individual vertical openings. The depths to the coal seams were 60 feet or less at all sites. When blasting for Abandoned Mine Land Reclamation, material must be cast downward into the abandoned developments or laterally into the sinkhole. Designs based on cratering concepts and spherical charges worked well. The blasting techniques successfully collapsed and stabilized the test areas. Cost of reclamation for the two test sites are presented. Data from blast vibration monitoring are presented because control of vibrations is of concern when mitigation efforts are conducted near homes

  12. 20 CFR 632.255 - Program planning.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a... with its title IV program. (2) Native American grantees shall use the planning process described in...

  13. Jiangsu coastal highland reclamation and its wetland ecological construction-a case analysis of the Tiaozini reclamation project

    Science.gov (United States)

    Yu, Meixiu; Xu, Xianghong

    2017-04-01

    Reclamation is one potential solution for the increasing demand of new land for living and development. In past centuries, many coastal countries, such as the Netherlands, UK, Japan, South Korea and Singapore, had exploited extensively sea enclosing and reclamation fordefense against storm surges,agricultural and industrial development, as well as for coastal city expansion along the coast. China has continuously reclaimed coastal sea areas from the 1950s. With rapid economic development and increasing population in coastal areas during recent decades, reclamation has been regarded as an effective measure to resolve the land shortage as cities and industries expand, particularly in South-East coastal areas. Jiangsu province, located in East China, has a similar amount of land territory area to the Netherlands, however, its population is almost fivefold instead. Since its coastal area generates large amounts of tidal flat resources due to its unique hydrodynamic and geomorphic conditions, coastal reclamation plays a vital role in guaranteeing the food security for the Jiangsu Province or even the whole nation. The Tiaozini Reclamation Project (TRP), located between N32.720°-32.882°, E120.894°-120.969°, in Jianggang county of Jiangsu coastal region, with an area of 6,746ha, was reclaimed along the prograding muddy silt coast in 2012. It should be noted that the TRP was reclaimed from theoretical bathymetrical datum of about 4.6m. It is estimated that the shoreline moves towards the sea at a rate of 100m/year and the tidal flat raises at a rate of 5 10 cm/year respectively because of the external tidal flat being continually prograding and drying. After finishing reclamation,the TRP develops with nature: for the dried tidal flat high land,developing ecological agriculture after integrated soil improvement with reducing salt and cultivating fertilizer; for the drying tidal flat,developing ecological fishery by inceasing artificial wetland area; for lower tidal flat

  14. Quantification of intensive hybrid coastal reclamation for revealing its impacts on macrozoobenthos

    International Nuclear Information System (INIS)

    Yan, Jiaguo; Cui, Baoshan; Zheng, Jingjing; Xie, Tian; Wang, Qing; Li, Shanze

    2015-01-01

    Managing and identifying the sources of anthropogenic stress in coastal wetlands requires an in-depth understanding of relationships between species diversity and human activities. Empirical and experimental studies provide clear evidence that coastal reclamation can have profound impacts on marine organisms, but the focus of such studies is generally on comparative or laboratory research. We developed a compound intensity index (reclamation intensity index, RI) on hybrid coastal reclamation, to quantify the impacts of reclamation on coastal ecosystems. We also made use of mean annual absolute changes to a number of biotic variables (biodiversity, species richness, biomass of total macrozoobenthos, and species richness and biomass of Polychaeta, Mollusca, Crustacea, and Echinodermata) to determine Hedges’d index, which is a measure of the potential effects of coastal reclamation. Our results showed that there was significant difference of coastal reclamation intensity between Yellow Sea, East China Sea and South China Sea, the biological changes in effect sizes of the three regions differed greatly over time. Our modelling analyses showed that hybrid coastal reclamation generally had significant negative impacts on species diversity and biomass of macrozoobenthos. These relationships varied among different taxonomic groups and included both linear and nonlinear relationships. The results indicated that a high-intensity of coastal reclamation contributed to a pronounced decline in species diversity and biomass, while lower-intensity reclamation, or reclamation within certain thresholds, resulted in a small increase in species diversity and biomass. These results have important implications for biodiversity conservation and the ecological restoration of coastal wetlands in face of the intensive reclamation activities. (letter)

  15. 75 FR 69698 - Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans

    Science.gov (United States)

    2010-11-15

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...

  16. Boric Acid Reclamation System (BARS)

    International Nuclear Information System (INIS)

    Kniazewycz, B.G.; Markind, J.

    1986-03-01

    KLM Technologies' personnel have identified a Boric Acid Reclamation System (BARS) utilizing reverse osmosis and ultrafiltration to produce a recyclable grade of otherwise waste boric acid at PWRs, thus reducing a major source of low-level radwaste. The design of a prototype BARS as a compact volume reduction system was the result of KLM's Phase 1 Program, and based upon a preliminary feasibility program, which assessed the applicability of membrane technology to refurbish and recycle waste boric acid from floor and equipment drain streams. The analysis of the overall program indicated a substantial savings regarding off-site disposal costs. Today's economic scenario indicates that optimization of volume reduction operation procedures could significantly reduce waste management costs, especially where burial penalties have become more severe. As a reaction to the economic burden imposed by final disposal, many nuclear plants are currently modifying their design and operating philosophies concerning liquid radwaste processing systems to meet stricter environmental regulations, and to derive potential economic benefits by reducing the ever-increasing volumes of wastes that are produced. To effect these changes, innovative practices in waste management and more efficient processing technologies are being successfully implemented

  17. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  18. Fusion safety program plan

    International Nuclear Information System (INIS)

    Crocker, J.G.; Holland, D.F.; Herring, J.S.

    1980-09-01

    The program plan consists of research that has been divided into 13 different areas. These areas focus on the radioactive inventories that are expected in fusion reactors, the energy sources potentially available to release a portion of these inventories, and analysis and design techniques to assess and ensure that the safety risks associated with operation of magnetic fusion facilities are acceptably low. The document presents both long-term program requirements that must be fulfilled as part of the commercialization of fusion power and a five-year plan for each of the 13 different program areas. Also presented is a general discussion of magnetic fusion reactor safety, a method for establishing priorities in the program, and specific priority ratings for each task in the five-year plan

  19. 45 CFR 1355.35 - Program improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Program improvement plans. 1355.35 Section 1355.35... plans. (a) Mandatory program improvement plan. (1) States found not to be operating in substantial conformity shall develop a program improvement plan. The program improvement plan must: (i) Be developed...

  20. Reclamation with a purpose. Proceedings of a joint conference of ASMR 19th annual national conference and IALR 6th international conference

    Energy Technology Data Exchange (ETDEWEB)

    Barnhisel, R.; Collins, M. (eds.) [American Society of Mining and Reclamation, Lexington, KY (United States)

    2002-07-01

    The conference covers the following topics: ecology; forestry and wildlife; geotechnical engineering; inter, tailing and reclamation; land use planning and design; soils and overburden and water management.

  1. Hanford site pollution prevention plan progress report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Kirkendall, J.R.

    1996-08-26

    This report tracks progress made during 1995 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307,`Plans,` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, `Waste Reduction,` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in- process reuse or reclamation of valuable spent material.

  2. The International Competition for the Reclamation of the Hiriya Landfill: A National Israeli Symbol in the ‘Global’ Arena

    Directory of Open Access Journals (Sweden)

    Tal Alon-Mozes

    2014-08-01

    Full Text Available The recent international competition for the reclamation of the Hiriya landfill (2004, located in the centre of Israel’s metropolitan area, was the climax of a fiveyear project, in which the fifty-year-old landfill (1948–1998, Israel’s largest, became the focus of international artistic, planning and design activities.This paper discusses the Hiriya project in order to explore the reciprocity between local activity within the field of landscape architecture and the global arena of landscape architecture practice, focusing specifically on the reclamation of marginal landscapes.For many years, Hiriya served as a symbol of Zionists’ environmental neglect. Therefore, unsurprisingly, the reclamation of the site and the design of the metropolitan park surrounding it became a national symbol of regeneration, involving world-renowned experts. By examining the planning process, and particularly the recent design competition, this paper explores the relationship between the local and the global, and significantly, the difficulty of bridging these opposing stands visà- vis landscape reclamation. The design process proved that, to be part of the global arena, it is not enough to bring in foreign designers and let them play according to local rules. It requires frankness toward greater  global cultural changes that are beyond the sole activity of design. The design proposals exemplify complex and rich interpretations of local and global ideas by both local and foreign designers, but ultimately proving that at times, outsiders are more successful in grasping the site’s genius loci than locals. 

  3. Mining and Reclamation Technology Symposium

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    1999-06-24

    The Mining and Reclamation Technology Symposium was commissioned by the Mountaintop Removal Mining/Valley Fill Environmental Impact Statement (EIS) Interagency Steering Committee as an educational forum for the members of the regulatory community who will participate in the development of the EIS. The Steering Committee sought a balanced audience to ensure the input to the regulatory community reflected the range of perspectives on this complicated and emotional issue. The focus of this symposium is on mining and reclamation technology alternatives, which is one of eleven topics scheduled for review to support development of the EIS. Others include hydrologic, environmental, ecological, and socio-economic issues.

  4. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  5. Renewable Energy Assessment for the Bureau of Reclamation

    Energy Technology Data Exchange (ETDEWEB)

    Haase, S.; Burman, K.; Dahle, D.; Heimiller, D.; Van Geet, O.

    2012-05-01

    Report summarizes the results of an assessment and analysis of renewable energy opportunities conducted for the U.S. Department of Interior, Bureau of Reclamation (Reclamation) by the National Renewable Energy Laboratory (NREL). Report contains results from utility scale analysis and site visits, as well as facility scale screening and site visits.

  6. New Production Reactors Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  7. New Production Reactors Program Plan

    International Nuclear Information System (INIS)

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs

  8. Agricultural field reclamation utilizing native grass crop production

    Science.gov (United States)

    J. Cure

    2013-01-01

    Developing a method of agricultural field reclamation to native grasses in the Lower San Pedro Watershed could prove to be a valuable tool for educational and practical purposes. Agricultural field reclamation utilizing native grass crop production will address water table depletion, soil degradation and the economic viability of the communities within the watershed....

  9. Reclamation and closure of an oil sands tailings facility

    Energy Technology Data Exchange (ETDEWEB)

    Sobkowicz, J. [Thurber Engineering Ltd., Calgary, AB (Canada); Morgenstern, N. [Alberta Univ., Edmonton, AB (Canada)

    2010-07-01

    This PowerPoint presentation discussed methods of ensuring the successful reclamation of oil sands tailings facilities. Tailings should be reclaimed as mining proceeds in order to avoid an excessive accumulation of fluid fine tailings (FFT). The volume of mature fine tailings (MFT) in ponds should be limited in order to ensure effective tailings management. The reclaimed landforms should have good geotechnical stability and be comprised of self-sustaining native vegetation. Strength is needed to allow for timely capping and initial reclamation, and stiffness is required to minimize future settlement and to allow for the construction of a closure landscape. Reclamation strategies were presented for fines-dominated tailings; sand-depleted tailings; and sand-dominated tailings. Energy Resources Conservation Board (ERCB) criteria for tailings reclamation were discussed, and various monitoring and performance assessment strategies were presented. tabs., figs.

  10. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ''Plans,'' for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ''Waste Reduction,'' an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD

  11. Hanford Site Pollution Prevention Plan progress report, 1994. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This report tracks progress made during 1994 against the goals stated in DOE/RL-92-62, Executive Summary, Hanford Site Pollution Prevention Plan. The Executive Summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, Executive Summary, and the progress reports are elements of a pollution prevention planning program that is required by WAC 173-307, ``Plans,`` for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement RCW 70.95C, ``Waste Reduction,`` an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the in-process reuse or reclamation of valuable spent material. The Hanford Site is voluntarily complying with this state regulatory-mandated program. All treatment, storage, or disposal (TSD) facilities are exempt from participating; the Hanford Site is classified as a TSD.

  12. Regulation of strontium migration and translocation in chemical reclamation of acid soils

    International Nuclear Information System (INIS)

    Velichko, V.A.; Okonskij, A.I.; Shestakov, E.I.; Panov, N.P.

    1993-01-01

    Results of chemical testing are presented of the local reclamants (ashes of various deposits and ferrochromium plant slags) to study the possibilities of their use for chemical soil reclamation. Attention was paid to the investigation of pollutant (strontium) behaviour in the reclamant-acid soil-plant-ground water system. Tracer method was used, 85 Sr was applied as a label. Prospects of zeolite application to control the strontium behaviour following the reclamant introduction into soil were considered. It was shown that zeolite application permitted to regulate strontium behaviour in the reclamant-soil-plant-ground water system. At that the modified zeolites possessing high Sr selectivity are recommended for application

  13. 75 FR 81643 - Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report

    Science.gov (United States)

    2010-12-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Hydropower Resource Assessment at Existing... period for review of the Hydropower Resource Assessment at Existing Reclamation Facilities Draft Report... sustainable, affordable hydropower for our national electricity supplies. Reclamation has 476 dams and 8,116...

  14. Facility-Scale Solar Photovoltaic Guidebook: Bureau of Reclamation

    Energy Technology Data Exchange (ETDEWEB)

    Kiatreungwattana, Kosol [National Renewable Energy Lab. (NREL), Golden, CO (United States); VanGeet, Otto [National Renewable Energy Lab. (NREL), Golden, CO (United States); Stoltenberg, Blaise [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This guidebook was written for the U.S. Bureau of Reclamation to explore the use of non-hydro renewable energy resources to meet the U.S. Department of Interior's objectives and Reclamation's mission. This guidebook presents readers with the processes and steps needed to assess and successfully implement facility-scale solar projects.

  15. 75 FR 48525 - Pennsylvania Regulatory Program

    Science.gov (United States)

    2010-08-10

    ... maintain jurisdiction of the regulatory program under the Federal Surface Mining Control and Reclamation... Part IV Department of the Interior Office of Surface Mining Reclamation and Enforcement 30 CFR... Surface Mining Reclamation and Enforcement 30 CFR Part 938 [PA-153; Docket ID OSM-2008-0021] Pennsylvania...

  16. Site Support Program Plan Infrastructure Program

    International Nuclear Information System (INIS)

    1995-01-01

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site's infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford's infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition

  17. Experimental verification of the energetic model of the dry mechanical reclamation process

    Directory of Open Access Journals (Sweden)

    R. Dańko

    2008-04-01

    Full Text Available The experimental results of the dry mechanical reclamation process, which constituted the bases for the verification of the energetic model of this process, developed by the author on the grounds of the Rittinger’s deterministic hypothesis of the crushing process, are presented in the paper. Used foundry sands with bentonite, with water-glass from the floster technology and used sands with furan FL 105 resin were used in the reclamation tests. In the mechanical and mechanical-cryogenic reclamation a wide range of time variations and reclamation conditions influencing intensity of the reclamation process – covering all possible parameters used in industrial devices - were applied. The developed theoretical model constitutes a new tool allowing selecting optimal times for the reclamation treatment of the given spent foundry sand at the assumed process intensity realized in rotor reclaimers - with leaves or rods as grinding elements mounted horizontally on the rotor axis.

  18. 30 CFR 780.13 - Operation plan: Blasting.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Blasting. 780.13 Section 780.13... SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.13 Operation plan: Blasting. (a) Blasting plan. Each application shall contain a blasting plan for the proposed...

  19. LANDSCAPE PLANNING IN UKRAINE: THE FIRST LANDSCAPE-PLANNING PROGRAM

    Directory of Open Access Journals (Sweden)

    Leonid Rudenko

    2013-01-01

    Full Text Available The paper presents the results of the first, in Ukraine; project on landscape planning widely accepted in European countries. Under the project implemented in 2010–2013, a landscape-planning program has been developed for the Cherkassy oblast. This is the first document of this kind in Ukraine. The program is mainly based on the experience of the German and Russian schools of landscape planning and on research and assessment conducted by the authors, which allowed identifying approaches to landscape planning, principles of the national policy, and characteristics and potential of environmentally friendly planning in Ukraine. The paper discusses the main phases of the work on the development of the landscape program for the oblast. It also identifies the main stages and key concepts and principles of landscape planning. The paper presents the results of integrated research on the identification and classification of conflicts in land use and the integral concept of the developmental goals for the oblast. The results can be the foundation for adopting management decisions and development of action plans for the lower hierarchal branches.

  20. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-06-05

    ... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  1. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-11-16

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...

  2. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-03-08

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  3. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-10-22

    ... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  4. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  5. Study of RC method on reclamation project in the uranium mine (Joint research)

    International Nuclear Information System (INIS)

    Ishizaka, Kaoru; Tanaka, Masaru; Suzuki, Kazuhiko; Tokizawa, Takayuki; Sato, Kazuhiko; Koga, Osamu

    2008-12-01

    To obtain public understanding on the uranium mining sites reclamation at Ningyo-toge Environmental Engineering Center, it is necessary to conduct appropriate Risk Communication (RC). In this study, to discuss the appropriate Risk communication method on the uranium mining sites reclamation, comparative investigation of risk communication cases which concern the siting of solid waste management facilities and nuclear facilities, and questionnaire survey on the risk perception of landfill were conducted. As a result of comparative investigation, information disclosure and the information supplement are important factor to obtain public trust on the siting plan and developer (government and company). However, it is necessary not only to offer information but also to foster information literacy at the same time. In the cases of best practice on consensus-building toward siting of facilities, there was suggestion that is importance to set up the public participation opportunity at an early planning stage to avoid adversary relationship between stakeholders. As assumption of the public participation, it is necessary the safety assurance of the siting plan and regional development plan cover a long period. As a result of questionnaire survey. It was shown that the almost people worried about health and the environmental impact of radioactive waste; moreover, there are a lot of ratios of the peoples who felt a dangerous and scary sensuously. Public trust on government was very low, Over 60 percent does not trust 'countermeasures at the accident' and nearly 70 percent does not trust the information disclosure at the accident'. 'Questions concern on public trust: countermeasures at the accident, information disclosure at the accident, environmental standard, and environmental technology show significant correlation with risk perception of landfill site. (author)

  6. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  7. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2011-08-31

    ... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  8. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-07-02

    ... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  9. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  10. Site Support Program Plan Infrastructure Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-26

    The Fiscal Year 1996 Infrastructure Program Site Support Program Plan addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition. The Hanford Site`s infrastructure has served the Site for nearly 50 years during defense materials production. Now with the challenges of the new environmental cleanup mission, Hanford`s infrastructure must meet current and future mission needs in a constrained budget environment, while complying with more stringent environmental, safety, and health regulations. The infrastructure requires upgrading, streamlining, and enhancement in order to successfully support the site mission of cleaning up the Site, research and development, and economic transition.

  11. 78 FR 11796 - Kentucky Regulatory Program

    Science.gov (United States)

    2013-02-20

    .... --$2,000 per acre and each fraction thereof for operations on previously mined areas. --$3,500 per acre... program (``the Kentucky program'') for surface coal mining and reclamation operations under the Surface... the amount of the performance bond for each surface coal mining and reclamation operation is...

  12. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  13. Application of toxicity testing in the evaluation of reclamation options for oil sands fine tails

    International Nuclear Information System (INIS)

    Nelson, L.R.; MacKinnon, M.; Gulley, J.R.

    1993-01-01

    The hot water process for the extraction of bitumen from oil sands leads to the production of large volumes of wastewater and the formation of a large inventory of fine clay tailings. This fine tailings material and its associated water are acutely toxic to various aquatic test organisms during bioassays. An overview is presented of toxicity testing at Syncrude and Suncor, the application of toxicity testing to fine tailings management, and the role in reclamation planning. The main acutely toxic component of the tailings is the polar organic acid fraction, specifically naphthanates. These naphthanates are readily degraded biologically by indigenous microbial populations. Toxicity testing is aimed at assessing the degree of both acute and chronic toxicity and the long term potential for the input of toxins into the environment from various proposed reclamation measures. 28 refs., 6 figs., 2 tabs

  14. Risk-based optimization of land reclamation

    International Nuclear Information System (INIS)

    Lendering, K.T.; Jonkman, S.N.; Gelder, P.H.A.J.M. van; Peters, D.J.

    2015-01-01

    Large-scale land reclamations are generally constructed by means of a landfill well above mean sea level. This can be costly in areas where good quality fill material is scarce. An alternative to save materials and costs is a ‘polder terminal’. The quay wall acts as a flood defense and the terminal level is well below the level of the quay wall. Compared with a conventional terminal, the costs are lower, but an additional flood risk is introduced. In this paper, a risk-based optimization is developed for a conventional and a polder terminal. It considers the investment and residual flood risk. The method takes into account both the quay wall and terminal level, which determine the probability and damage of flooding. The optimal quay wall level is found by solving a Lambert function numerically. The terminal level is bounded by engineering boundary conditions, i.e. piping and uplift of the cover layer of the terminal yard. It is found that, for a representative case study, the saving of reclamation costs for a polder terminal is larger than the increase of flood risk. The model is applicable to other cases of land reclamation and to similar optimization problems in flood risk management. - Highlights: • A polder terminal can be an attractive alternative for a conventional terminal. • A polder terminal is feasible at locations with high reclamation cost. • A risk-based approach is required to determine the optimal protection levels. • The depth of the polder terminal yard is bounded by uplifting of the cover layer. • This paper can support decisions regarding alternatives for port expansions.

  15. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  16. The effect of mining on landscape ecological systems and land reclamation

    International Nuclear Information System (INIS)

    Stys, S.

    1991-01-01

    Coal mining causes serious disturbance of the environment. Basic principles for the reclamation of affected territories are discussed. The effects of mining on the socio-ecological landscape system, the agricultural and forestry aspects of reclamation technologies after surface mining and the factors affecting the way of reclamation are shown in a diagrammatic form. The attached photographs document the effect of mining on landscape devastation. (M.D.). 17 figs

  17. Local Authority Empowerment towards Quality Living Environment for Coastal Reclamation Area

    Directory of Open Access Journals (Sweden)

    Yusup Mohammad

    2016-01-01

    Full Text Available Good urban governance administration system is the key to a successful physical planning development. A local authority of a local government concentrates on planning administration and executes the policies and strategies either the federal or state, or even the local’s policies and strategies. Based on its characteristic as the lowest level of government, it becomes the best authority to regulate and monitor the development process within their territory. The significance of a local authority in providing quality living environment invites various academia and professionals to ponder the best urban governance system at a local level. However, there are issues with regards to financial and technical capacity of a local authority, its legal limitation and development instrument adopted in providing urban services for coastal reclamation area in Malaysia. The aim of this paper is to investigate the capability of local authorities in Malaysia in implementing their function as drawn by the legislation. Hence, this paper examines the roles and functions of a local authority as the lowest level of government administration agency in providing urban services; collecting revenue; safeguarding the physical environment in Malaysia, particularly when dealing with development in a coastal reclamation area. Primary data collection was gathered through face-to-face interview sessions involving government agencies and stakeholders. Legal documents, policies and development plans were then analysed to support the primary data for further understanding of the issues concerning the capacity of a local authority especially when providing urban services within its area. The study is expected to provide a new approach to local authorities in Malaysia in providing quality living environment in terms of development procedure, the role and function, legal empowerment, and decentralisation of function particularly in enhancing the current practices at local level.

  18. Mainstreaming Climate Change: Recent and Ongoing Efforts to Understand, Improve, and Expand Consideration of Climate Change in Federal Water Resources Planning

    Science.gov (United States)

    Ferguson, I. M.; McGuire, M.; Broman, D.; Gangopadhyay, S.

    2017-12-01

    The Bureau of Reclamation is a Federal agency tasked with developing and managing water supply and hydropower projects in the Western U.S. Climate and hydrologic variability and change significantly impact management actions and outcomes across Reclamation's programs and initiatives, including water resource planning and operations, infrastructure design and maintenance, hydropower generation, and ecosystem restoration, among others. Planning, design, and implementation of these programs therefore requires consideration of future climate and hydrologic conditions will impact program objectives. Over the past decade, Reclamation and other Federal agencies have adopted new guidelines, directives, and mandates that require consideration of climate change in water resources planning and decision making. Meanwhile, the scientific community has developed a large number of climate projections, along with an array of models, methods, and tools to facilitate consideration of climate projections in planning and decision making. However, water resources engineers, planners, and decision makers continue to face challenges regarding how best to use the available data and tools to support major decisions, including decisions regarding infrastructure investments and long-term operating criteria. This presentation will discuss recent and ongoing research towards understanding, improving, and expanding consideration of climate projections and related uncertainties in Federal water resources planning and decision making. These research efforts address a variety of challenges, including: How to choose between available climate projection datasets and related methods, models, and tools—many of which are considered experimental or research tools? How to select an appropriate decision framework when design or operating alternatives may differ between climate scenarios? How to effectively communicate results of a climate impacts analysis to decision makers? And, how to improve

  19. 75 FR 4102 - Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Folsom Lake State Recreation Area and Folsom Power House State Historic Park General Plan/Resource Management Plan AGENCY: Bureau of Reclamation... review and comment a joint Final EIS/EIR for the Folsom Lake State Recreation Area and Folsom Power House...

  20. Environmental Planning and Ecology Program Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2008-01-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  1. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  2. Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans

    International Nuclear Information System (INIS)

    1980-01-01

    This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager

  3. 76 FR 7098 - Dealer Floor Plan Pilot Program

    Science.gov (United States)

    2011-02-09

    ... Plan Pilot Program AGENCY: U.S. Small Business Administration (SBA). ACTION: Program implementation with request for comments. SUMMARY: SBA is introducing a new Dealer Floor Plan Pilot Program to make... Plan Pilot Program was created in the Small Business Jobs Act of 2010. Under the new Dealer Floor Plan...

  4. Performance Demonstration Program Plan for the WIPP Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    1991-02-01

    The Performance Demonstration Program is designed to ensure that compliance with the Quality Assurance Objective, identified in the Quality Assurance Program Plan for the WIPP Experimental-Waste Characterization Program (QAPP), is achieved. This Program Plan is intended for use by the WPO to assess the laboratory support provided for the characterization of WIPP TRU waste by the storage/generator sites. Phase 0 of the Performance Demonstration Program encompasses the analysis of headspace gas samples for inorganic and organic components. The WPO will ensure the implementation of this plan by designating an independent organization to coordinate and provide technical oversight for the program (Program Coordinator). Initial program support, regarding the technical oversight and coordination functions, shall be provided by the USEPA-ORP. This plan identifies the criteria that will be used for the evaluation of laboratory performance, the responsibilities of the Program Coordinator, and the responsibilities of the participating laboratories. 5 tabs

  5. 30 CFR 784.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 784.12... PLAN § 784.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include: (1) Location; (2) Plans of the structure...

  6. 30 CFR 780.12 - Operation plan: Existing structures.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: Existing structures. 780.12... PLAN § 780.12 Operation plan: Existing structures. (a) Each application shall contain a description of... and reclamation operation. The description shall include— (1) Location; (2) Plans of the structure...

  7. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  8. FY85 Program plan for the Defense Transuranic Waste Program (DTWP)

    International Nuclear Information System (INIS)

    1984-11-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY85 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Research and Development (R and D), the organizational interfaces and communication channels for R and D and the establishment of procedures for planning, reporting, and budgeting of all R and D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. The Program Plan is revised as needed. The work breakdown structure is reflected graphically immediately following the Administration section and is described in the subsequent narrative. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY85; outyear budget projections are presented for future years

  9. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Science.gov (United States)

    2010-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  10. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  11. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Science.gov (United States)

    2011-09-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...

  12. Quality assurance program plan for the Reactor Research Experiment Programs (RREP)

    International Nuclear Information System (INIS)

    Pipher, D.G.

    1982-05-01

    This document describes the Quality Assurance Program plans which will be applied to tasks on Reactor Research Experiments performed on Sandia National Laboratories' reactors. The program provides for individual project or experiment quality plan development and allows for reasonable plan flexibility and maximum plan visibility. Various controls and requirements in this program plan are considered mandatory on all features which are identified as important to public health and safety (Level I). It is the intent of this document that the Quality Assurance program comprise those elements which will provide adequate assurance that all components, equipment, and systems of the experiments will perform as designed, and hence prevent delays and costs due to rejections or failures

  13. Sea Reclamation Status of Countries around the South China Sea from 1975 to 2010

    Directory of Open Access Journals (Sweden)

    Junjue Zhang

    2017-05-01

    Full Text Available As a way of turning sea into land for living space for humans, the actions of sea reclamation bring about significant benefits. Nevertheless, it is also an under-recognized threat to the environment and the marine ecosystem. Based on images in two periods, sea reclamation information of countries around the South China Sea was extracted from 1975 to 2010. The spatial state and driven forces of sea reclamation are then discussed. Results show that the overall strength of sea reclamation in the South China Sea was great. New reclaimed land added up to 3264 km2. Sea reclamation for fish farming was the main reclamation type and widely distributed in the whole area, especially on the coast from the Pearl River Delta to the Red River Delta, and the coast of Ca Mau Peninsula. Sea reclamation in China and Vietnam was rather significant, which occupies 80.6% of the total reclamation area. Singapore had the highest level of sea reclamation. New reclaimed land for fish farming holds a key role in China, Vietnam, and Indonesia, while new reclaimed land for construction and docks dominated in Malaysia, Singapore, and Brunei. Areas and use-type compositions of new reclaimed land in countries varied greatly due to the differences of economic factors, policy inclination, and landscapes in the respective countries.

  14. Performance-based planning and programming guidebook.

    Science.gov (United States)

    2013-09-01

    "Performance-based planning and programming (PBPP) refers to the application of performance management principles within the planning and programming processes of transportation agencies to achieve desired performance outcomes for the multimodal tran...

  15. LDRD FY 2014 Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  16. The way it was : reclamation research gears up for oilsands expansion

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2005-10-01

    Although many new developments in oilsands mining operations are in situ, the continuing reliance on truck and shovel projects will mean more mine-scale disturbance and more tailings. Managing tailings is an integral aspect of mine reclamation. Syncrude and Suncor have reclaimed close to 5000 hectares of land, planting trees and grasses. This article discussed future reclamation strategies, which are targeted to also include constructed and natural wetlands to provide habitat for local waterfowl, vegetation and animals. Details of an ongoing 4 year study of natural and constructed wetlands in the Fort McMurray oil sands region were provided. The study has focused on opportunistic wetlands that form themselves close to man-made structures. Because of their microbial content, wetlands are capable of treating contaminated water. A pilot-scale constructed wetland has started operating at Keyspan Energy's Strachan gas plant. It was noted that the peatlands that have been removed cannot easily be replaced after mine closure, since their development is the result of thousands of years of production and evolution. The goal of the project is to create marshes in order to re-contour the land with a range of different land features. Details of the Oil Sands Tailings Research Facility (OSTRF) were provided, a $2.3 million facility with a focus on finding better ways to manage tailings. One of the main problems in tailings management is the length of time it takes for tailings to settle after being discharged from the extraction plant. A description of the facility was provided, with details of research into tailings-thickening procedures which result in composite or consolidated tailings, as well as a project where tailings flow and settle into deposition modules, which can then be lifted out and taken away for examination. Plans for test pits in the future were also reviewed. It was concluded that reclamation is an increasingly important aspect of oil sands operations

  17. Evaluation of the Navy Master Planning Program

    Science.gov (United States)

    1976-05-01

    Navy planning directives, interviews with Navy planning personnel, researc " of applicable literature on planning and program evaluation, and the...master planning has absorbed the additional roles of program management and public relations marketing . The Navy planner is now deeply involved in...master planning 62conducted by NAVFAC headquarters in 1972, various Navy planning directives, a " Market Survey" of NAVFAC services and customer 63

  18. Natural Gas Multi-Year Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    This document comprises the Department of Energy (DOE) Natural Gas Multi-Year Program Plan, and is a follow-up to the `Natural Gas Strategic Plan and Program Crosscut Plans,` dated July 1995. DOE`s natural gas programs are aimed at simultaneously meeting our national energy needs, reducing oil imports, protecting our environment, and improving our economy. The Natural Gas Multi-Year Program Plan represents a Department-wide effort on expanded development and use of natural gas and defines Federal government and US industry roles in partnering to accomplish defined strategic goals. The four overarching goals of the Natural Gas Program are to: (1) foster development of advanced natural gas technologies, (2) encourage adoption of advanced natural gas technologies in new and existing markets, (3) support removal of policy impediments to natural gas use in new and existing markets, and (4) foster technologies and policies to maximize environmental benefits of natural gas use.

  19. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  20. Subseabed-disposal program: systems-analysis program plan

    International Nuclear Information System (INIS)

    Klett, R.D.

    1981-03-01

    This report contains an overview of the Subseabed Nuclear Waste Disposal Program systems analysis program plan, and includes sensitivity, safety, optimization, and cost/benefit analyses. Details of the primary barrier sensitivity analysis and the data acquisition and modeling cost/benefit studies are given, as well as the schedule through the technical, environmental, and engineering feasibility phases of the program

  1. Single Shell Tank (SST) Program Plan

    International Nuclear Information System (INIS)

    HAASS, C.C.

    2000-01-01

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000

  2. Single Shell Tank (SST) Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    HAASS, C.C.

    2000-03-21

    This document provides an initial program plan for retrieval of the single-shell tank waste. Requirements, technical approach, schedule, organization, management, and cost and funding are discussed. The program plan will be refined and updated in fiscal year 2000.

  3. Double Tracks revegetation and monitoring plan

    International Nuclear Information System (INIS)

    1997-07-01

    This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim clean-up of radionuclide-contaminated surface soil at the Double Tracks site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the site in the fall of 1994 to evaluate the performance of several native species and to evaluate different irrigation strategies. Results of the study at Double Tracks, as well as the results from numerous studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the interim cleanup of the Double Tracks site, located northwest of the Nevada Test Site on the Nellis Air Force Range. Surface soils at Double Tracks were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. The total amount of Pu deposited on the site was between 980 and 1,600 grams and was scattered downwind south of the detonation site. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation

  4. Multiobjective programming and planning

    CERN Document Server

    Cohon, Jared L

    2004-01-01

    This text takes a broad view of multiobjective programming, emphasizing the methods most useful for continuous problems. It reviews multiobjective programming methods in the context of public decision-making problems, developing each problem within a context that addresses practical aspects of planning issues. Topics include a review of linear programming, the formulation of the general multiobjective programming problem, classification of multiobjective programming methods, techniques for generating noninferior solutions, multiple-decision-making methods, multiobjective analysis of water reso

  5. 30 CFR 784.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 784.11... PLAN § 784.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  6. 30 CFR 780.11 - Operation plan: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Operation plan: General requirements. 780.11... PLAN § 780.11 Operation plan: General requirements. Each application shall contain a description of the... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER...

  7. Cultural keystone species in oil sands mine reclamation, Fort McKay, Alberta, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Garibaldi, A.; Straker, J. [Stantec Ltd., Sidney, BC (Canada)

    2009-07-01

    Cultural keystone species (CKS) shape the cultural identify of people through the roles they have in diet, material and spiritual practices. The use of the CKS concept is regarded as a method of addressing linked social and ecological issues. This paper presented the results of using the CKS model in the indigenous community of Fort McKay, Alberta to address, social, ecological and spiritual values in regional mine-land reclamation. Fort McKay is at the epicenter of the existing mine developments. Its residents regard human and environmental health to be be linked and therefore experience the effects of development and subsequent reclamation on both cultural and ecological levels. The community is actively engaged in working with the local mining companies on issues of mine reclamation design. In order to hold meaning to the local people, oil sand operators used the CKS concept in their reclamation efforts to take into account ecological functionality and also address the linked social factors. Five CKS were identified through a literature review and extensive community interviews. The list includes moose, cranberry, blueberry, ratroot and beaver. These 5 CKS were used to focus discussions and make recommendations for relevant land reclamation within Fort McKay traditional territory. The project has influenced the way both the community and oil sands operators engage with reclamation. Lessons learned from this process will help direct reclamation activities on other portions of traditional territory, while offering guidance to other regional developers for addressing cultural values in reclamation on their leases. 15 refs., 1 fig.

  8. Educational program emergency planning.

    Science.gov (United States)

    Curtis, Tammy

    2009-01-01

    Tragic university shootings have prompted administrators of higher education institutions to re-evaluate their emergency preparedness plans and take appropriate measures for preventing and responding to emergencies. To review the literature and identify key components needed to prevent shootings at higher education institutions in the United States, and in particular, institutions housing radiologic science programs. Twenty-eight emergency preparedness plans were retrieved electronically and reviewed from a convenience sample of accredited radiologic science programs provided by the Joint Review Committee on Education in Radiologic Technology Web site. The review of the 28 emergency preparedness plans confirmed that most colleges are prepared for basic emergencies, but lack the key components needed to successfully address mass-casualty events. Only 5 (18%) of the 28 institutions addressed policies concerning school shootings.

  9. Effect of reclamation on soil organic carbon pools in coastal areas of eastern China

    Science.gov (United States)

    Li, Jianguo; Yang, Wenhui; Li, Qiang; Pu, Lijie; Xu, Yan; Zhang, Zhongqi; Liu, Lili

    2018-06-01

    The coastal wetlands of eastern China form one of the most important carbon sinks in the world. However, reclamation can significantly alter the soil carbon pool dynamics in these areas. In this study, a chronosequence was constructed for four reclamation zones in Rudong County, Jiangsu Province, eastern China (reclaimed in 1951, 1974, 1982, and 2007) and a reference salt marsh to identify both the process of soil organic carbon (SOC) evolution, as well as the effect of cropping and soil properties on SOC with time after reclamation. The results show that whereas soil nutrient elements and SOC increased after reclamation, the electrical conductivity of the saturated soil extract (ECe), pH, and bulk density decreased within 62 years following reclamation and agricultural amendment. In general, the soil's chemical properties remarkably improved and SOC increased significantly for approximately 30 years after reclamation. Reclamation for agriculture (rice and cotton) significantly increased the soil organic carbon density (SOCD) in the top 60 cm, especially in the top 0-30 cm. However, whereas the highest concentration of SOCD in rice-growing areas was in the top 0-20 cm of the soil profile, it was greater at a 20-60 cm depth in cottongrowing areas. Reclamation also significantly increased heavy fraction organic carbon (HFOC) levels in the 0-30 cm layer, thereby enhancing the stability of the soil carbon pool. SOC can thus increase significantly over a long time period after coastal reclamation, especially in areas of cultivation, where coastal SOC pools in eastern China tend to be more stable.

  10. Effect of reclamation on soil organic carbon pools in coastal areas of eastern China

    Science.gov (United States)

    Li, Jianguo; Yang, Wenhui; Li, Qiang; Pu, Lijie; Xu, Yan; Zhang, Zhongqi; Liu, Lili

    2018-04-01

    The coastal wetlands of eastern China form one of the most important carbon sinks in the world. However, reclamation can significantly alter the soil carbon pool dynamics in these areas. In this study, a chronosequence was constructed for four reclamation zones in Rudong County, Jiangsu Province, eastern China (reclaimed in 1951, 1974, 1982, and 2007) and a reference salt marsh to identify both the process of soil organic carbon (SOC) evolution, as well as the effect of cropping and soil properties on SOC with time after reclamation. The results show that whereas soil nutrient elements and SOC increased after reclamation, the electrical conductivity of the saturated soil extract (ECe), pH, and bulk density decreased within 62 years following reclamation and agricultural amendment. In general, the soil's chemical properties remarkably improved and SOC increased significantly for approximately 30 years after reclamation. Reclamation for agriculture (rice and cotton) significantly increased the soil organic carbon density (SOCD) in the top 60 cm, especially in the top 0-30 cm. However, whereas the highest concentration of SOCD in rice-growing areas was in the top 0-20 cm of the soil profile, it was greater at a 20-60 cm depth in cottongrowing areas. Reclamation also significantly increased heavy fraction organic carbon (HFOC) levels in the 0-30 cm layer, thereby enhancing the stability of the soil carbon pool. SOC can thus increase significantly over a long time period after coastal reclamation, especially in areas of cultivation, where coastal SOC pools in eastern China tend to be more stable.

  11. Alberta Surface Reclamation Fund annual report, April 1, 1992 to March 31, 1993

    International Nuclear Information System (INIS)

    1993-01-01

    The Alberta Surface Reclamation Fund holds security deposits as an incentive to assure satisfactory reclamation of coal and oil sands exploration and coal, pipelines, sand and gravel and oil sands development operations. Upon satisfactory compliance, the funds are returned to the depositor. Where there is not satisfactory compliance, the Land Conservation and Reclamation Council is obligated to carry out the subsequent reclamation and the funds are used to complete the reclamation. This document also reports on the disposition of all non-cash security deposits which have been accepted instead of cash. During the year, $382,610 was refunded from coal exploration deposits, $82,226 was refunded from oil sands exploration deposits, $259,427 was refunded from pipeline development and reclamation deposits, and $94,421 was refunded from sand and gravel deposits where satisfactory reclamation had been completed. The fund, which is an integral part of the Consolidated Cash Investment Trust Fund administered by the Provincial Treasurer, earned between 6.15 and 7.85% interest on cash deposits calculated monthly. The interest accrues to the depositor's account on a quarterly basis. The total cash deposits plus interest, bonds and guaratees as of March 31, 1993 held in the fund was $116,199,168. The balance sheet and operating account summary summarize the fund and also provide details of each individual account

  12. Alberta Surface Reclamation Fund annual report, April 1, 1991 to March 31, 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The Alberta Surface Reclamation Fund holds security deposits as an incentive to assure satisfactory reclamation of coal and oil sands exploration and coal, pipelines, sand and gravel and oil sands development operations. Upon satisfactory compliance, the funds are returned to the depositor. Where there is not satisfactory compliance, the Land Conservation and Reclamation Council is obligated to carry out the subsequent reclamation and the funds are used to complete the reclamation. This document also reports on the disposition of all non-cash security deposits which have been accepted instead of cash. During the year, $136,703 was refunded from coal development deposits, $199,788 was refunded from coal exploration deposits, $92,200 was refunded from oil exploration deposits, $145,565 was refunded from pipeline development and reclamation deposits, and $281,209 was refunded from sand and gravel deposits where satisfactory reclamation had been completed. The fund, which is an integral part of the Consolidated Cash Investment Trust Fund administered by the Provincial Treasurer, earned between 7.88 and 10.4% interest on cash deposits calculated monthly. The interest accrues to the depositor's account on a quarterly basis. The total cash deposits plus interest, bonds and guaratees as of March 31, 1992 held in the fund was $110,811,702. The balance sheet and operating account summary summarize the fund and also provide details of each individual account

  13. Revised GCFR safety program plan

    International Nuclear Information System (INIS)

    Kelley, A.P.; Boyack, B.E.; Torri, A.

    1980-05-01

    This paper presents a summary of the recently revised gas-cooled fast breeder reactor (GCFR) safety program plan. The activities under this plan are organized to support six lines of protection (LOPs) for protection of the public from postulated GCFR accidents. Each LOP provides an independent, sequential, quantifiable risk barrier between the public and the radiological hazards associated with postulated GCFR accidents. To implement a quantitative risk-based approach in identifying the important technology requirements for each LOP, frequency and consequence-limiting goals are allocated to each. To ensure that all necessary tasks are covered to achieve these goals, the program plan is broken into a work breakdown structure (WBS). Finally, the means by which the plan is being implemented are discussed

  14. Surface Mining and Reclamation Effects on Flood Response of Watersheds in the Central Appalachian Plateau Region

    Science.gov (United States)

    Ferrari, J. R.; Lookingbill, T. R.; McCormick, B.; Townsend, P. A.; Eshleman, K. N.

    2009-01-01

    Surface mining of coal and subsequent reclamation represent the dominant land use change in the central Appalachian Plateau (CAP) region of the United States. Hydrologic impacts of surface mining have been studied at the plot scale, but effects at broader scales have not been explored adequately. Broad-scale classification of reclaimed sites is difficult because standing vegetation makes them nearly indistinguishable from alternate land uses. We used a land cover data set that accurately maps surface mines for a 187-km2 watershed within the CAP. These land cover data, as well as plot-level data from within the watershed, are used with HSPF (Hydrologic Simulation Program-Fortran) to estimate changes in flood response as a function of increased mining. Results show that the rate at which flood magnitude increases due to increased mining is linear, with greater rates observed for less frequent return intervals. These findings indicate that mine reclamation leaves the landscape in a condition more similar to urban areas rather than does simple deforestation, and call into question the effectiveness of reclamation in terms of returning mined areas to the hydrological state that existed before mining.

  15. Pedo-geological activities with exploration of lignite deposits and their value for soil reclamation

    Energy Technology Data Exchange (ETDEWEB)

    Wuensche, M.; Richter, H.; Oehme, W.D.

    1983-10-01

    A description is presented of geological conditions facilitating soil reclamation and of the overburden removal technologies to be applied. Pedo-geological pre-exploitation studies are indispensable for soil reclamation and their methods and results are described with a final reference to the value of land reclamation for national economy.

  16. USGS Workshop on Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam, April 10-11, 2007, Flagstaff, Arizona

    Science.gov (United States)

    ,

    2008-01-01

    Executive Summary Glen Canyon Dam is located in the lower reaches of Glen Canyon National Recreation Area on the Colorado River, approximately 15 miles upriver from Grand Canyon National Park (fig. 1). In 1992, Congress passed and the President signed into law the Grand Canyon Protection Act (GCPA; title XVIII, sec. 1801?1809, of Public Law 102-575), which seeks ?to protect, mitigate adverse impacts to, and improve the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established.? The Glen Canyon Dam Adaptive Management Program (GCDAMP) was implemented as a result of the 1996 Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to ensure that the primary mandate of the GCPA is met through advances in information and resources management (U.S. Department of the Interior, 1995). On November 3, 2006, the Bureau of Reclamation (Reclamation) announced it would develop a long-term experimental plan environmental impact statement (LTEP EIS) for operational activities at Glen Canyon Dam and other management actions on the Colorado River. The purpose of the long-term experimental plan is twofold: (1) to increase the scientific understanding of the ecosystem and (2) to improve and protect important downstream resources. The proposed plan would implement a structured, longterm program of experimentation to include dam operations, potential modifications to Glen Canyon Dam intake structures, and other management actions such as removal of nonnative fish species. The development of the long-term experimental plan continues efforts begun by the GCDAMP to protect resources downstream of Glen Canyon Dam, including Grand Canyon, through adaptive management and scientific experimentation. The LTEP EIS will rely on the extensive scientific studies that have been undertaken as part of the adaptive management program by the U.S. Geological Survey?s (USGS) Grand Canyon Monitoring and Research Center (GCMRC

  17. Utilisation of Products of the Thermal Reclamation of Post Reclamation Dusts in the Production Technology of Ceramic Building Materials

    Directory of Open Access Journals (Sweden)

    Holtzer M.

    2015-12-01

    Full Text Available The problem related to the management of post reclamation dusts generated in the reclamation process of waste moulding sands with organic binders is presented in the hereby paper. Waste materials generated in this process are products hazardous for the environment and should be utilised. The prototype stand for the utilisation of this dangerous material in its co-burning with coal was developed and patented in AGH in Krakow. The stand was installed in one of the domestic casting houses. As the utilisation result the transformed waste product is obtained and its management in the production of ceramic materials constitutes the subject of the presented publication.

  18. KLM's Boric Acid Reclamation System (BARS): An update

    International Nuclear Information System (INIS)

    Schuelke, D.; Kniazewycz, B.G.; Markind, J.; Brossart, M.A.; Choi, R.C.

    1987-02-01

    KLM Technologies has implemented its Department of Energy Phase II Small Business Innovative Research (SBIR) demonstration program for a radioactive waste Boric Acid Reclamation System (BARS). Preliminary performance indicates enhanced treatment by the BARS technique over state of the art process methods for selective removal of silica and other impurities from borated water matrices. At optimal system recovery of 96 to 97%, BARS removes nominal levels of boric acid while achieving significant rejection for soluble silica and selective radioisotopes. This is indicative of superior performance compared to existing data governing standard boric acid process treatment in the presence of silica and other contaminants. Conventional technologies have also proven to be relatively expensive, utilizing costly chemically treated disposable resins for primary waste removal. The overall BARS program indicates substantial savings regarding off-site disposal costs based on reduced waste generation. Optimization of the BARS technology could have potential impact on conventional process technologies that are essentially non-selective in removal capacities. 2 figs

  19. Predicted water quality of oil sands reclamation wetlands : impact of physical design and hydrology

    International Nuclear Information System (INIS)

    2006-01-01

    Although engineered wetlands can be used as treatment systems in the reclamation of oil sands mines, a variety of factors must be considered to improve the biological functioning of many oil sands reclamation landscapes. Key factors in the control of concentrations of dissolved substances include area, depth, shape, surrounding landscape material and contributing water quality and quantity. Seasonal cycles of precipitation and ice cover also require consideration in the planning of wetlands ecosystems. This paper presented details of a model designed to predict constituent concentrations in planned wetlands based on probable inflow and processes. Input variables consisted of key substances and hydrological factors that may be encountered on reclaimed landscapes. The model was constructed to perform sensitivity analyses of wetlands with respect to total dissolved solids (TDS), major ions, and naphthenic acids concentrations. Inputs and assumptions drawn from previous environmental impact assessments completed for proposed and approved oil sands projects were used. Results suggested that wetlands volume is an important factor in the moderation of peak flows and substance decay. The predictions generated by the model suggested that wetlands size, tailings and sandcap placement schedules may be manipulated to achieve desired wetlands salinities. It was observed that the proportion of the watershed covered by specific land types can affect both initial and future concentrations. Long-term climate change that results in 15 per cent more or less runoff was predicted to have little effect on wetlands concentrations, although concentrations may rise during periodic droughts. It was concluded that site-specific modelling and careful planning is needed to achieve desired water quality for the creation of engineered wetlands. 18 refs., 3 tabs., 3 figs

  20. Reclamation to native forest ecosystems in the oil sands region

    International Nuclear Information System (INIS)

    Tuttle, S.

    1996-01-01

    Suncor's reclamation goal is to achieve maintenance-free, self-sustaining ecosystems with capability equivalent to their pre-disturbed condition. Ecosystem re-establishment includes the following steps: (1) soil reconstruction, (2) revegetation, and (3) growth of primary vegetation communities. To assess the sustainability of re-established ecosystems, vegetation and soil characteristics are monitored each year. This method of reclamation and tree planting results in a diverse herbaceous cover developing within a year of soil amendment application, providing erosion protection along with a source of cover and food for wildlife. Results to date have proven to be very positive, since reconstructed soils have been shown to be equivalent to or better than original soils. Also, reclamation sites are developing into sustainable ecological units comparable to nearby natural forest areas

  1. A Guide to Program Planning Vol. II.

    Science.gov (United States)

    Allen, Earl, Sr.

    This booklet is a simplified guide for program planning and is intended to complement a somewhat lengthier companion booklet on program evaluation. It spells out in outline fashion the basic elements and steps involved in the planning process. Brief sections focus in turn on different phases of the planning process, including problem…

  2. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    International Nuclear Information System (INIS)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides 'execution year' work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets

  3. Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

  4. First regional CSM program planned.

    Science.gov (United States)

    1982-09-01

    6 countries in the English-speaking Caribbean (Antigua, Barbados, Dominica, St. Kitts/Nevis, St. Lucia, and St. Vincent) are scheduled to form the 1st regional contraceptive social marketing program. The program will be under the auspices of the Barbados Family Planning Association. By combining resources, contraceptive social marketing should be able to effectively augment family planning activities in smaller countries where individual programs wuld be too costly. The regional program will also determine whether program elements from 1 country in a region are relevant in other countries. The Caribbean region as a whole has experienced a general decline in both crude birth rates and fertility rates during the past 15 years; however, adolescent fertility rates remain high and an average of 46% of the populations of Caribbean countries are under 15 years of age. Although heavy emigration has traditionally curbed population increases, new restrictive immigration laws are expected. Further increases in the working age population will contribute to already high unemployment rates and hinder economic development. The 6 countries selected for the social marketing program are receptive to innovative family planning approaches and have the basic marketing infrastructure required. Community-based distribution programs already in operation in these countries distribute condoms, oral contraceptives, and barrier methods. The success of these programs has plateaued, and there is a need for delivery systems capable of reaching broader segments of the population. The social marketing program will be phased in to ensure local acceptance among national leaders and consumers. The regional program hopes to borrow elements from Jamaica's contraceptive social marketing program to avoid the costs involved in starting a program from scratch. A major innovation will be the use of mass media advertising for contraceptives.

  5. 43 CFR 404.44 - What criteria will Reclamation apply to determine whether it is appropriate to recommend that a...

    Science.gov (United States)

    2010-10-01

    ... health and safety; (3) Will meet water demand, including projected future needs; (4) Provides... THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal Investigations § 404.44 What criteria... in the investigation, whether the alternative: (1) Identifies viable water supplies and water rights...

  6. Bottom head failure program plan

    International Nuclear Information System (INIS)

    Meyer, R.O.

    1989-01-01

    Earlier this year the NRC staff presented a Revised Severe Accident Research Program Plan (SECY-89-123) to the Commission and initiated work on that plan. Two of the near-term issues in that plan involve failure of the bottom head of the reactor pressure vessel. These two issues are (1) depressurization and DCH and (2) BWR Mark I Containment Shell Meltthrough. ORNL has developed models for several competing failure mechanisms for BWRs. INEL has performed analytical and experimental work directly related to bottom head failure in connection with several programs. SNL has conducted a number of analyses and experimental activities to examine the failure of LWR vessels. In addition to the government-sponsored work mentioned above, EPRI and FAI performed studies on vessel failure for the Industry Degraded Core Rulemaking Program (IDCOR). EPRI examined the failure of a PWR vessel bottom head without penetrations, as found in some Combustion Engineering reactors. To give more attention to this subject as called for by the revised Severe Accident Research Plan, two things are being done. First, work previously done is being reviewed carefully to develop an overall picture and to determine the reliability of assumptions used in those studies. Second, new work is being planned for FY90 to try to complete a reasonable understanding of the failure process. The review and planning are being done in close cooperation with the ACRS. Results of this exercise will be presented in this paper

  7. Field manual for reclamation of salt contaminated soils

    International Nuclear Information System (INIS)

    Burley, M.J.; Lesky, M.; Warren, R.J.

    1988-01-01

    Saltwater is often produced with crude oil and must be separated from it at a processing facility prior to deep-well injection. Increasing volumes of saltwater have led to pipeline corrosion and an increasing frequency of saltwater spills. A field manual for treating saltwater-contaminated soil was prepared by the Production Research Department of Esso Resources Canada Limited and Husky Oil Operations Limited. The purpose of the manual is to provide field and plant operations with a practical guide for reclaiming brine spills on mineral (agricultural) soil. The manual covers background scientific theory about how saltwater affects the soil, initial steps for treating new spills, site assessment, and reclamation program design, implementation and monitoring. A sample spill site assessment form is included. 8 refs

  8. An exploration of Bureau of Reclamation approaches for managing conflict over diverging science

    Science.gov (United States)

    Burkardt, Nina; Ruell, Emily; Clark, Douglas

    2008-01-01

    As a major institutional agent supplying Western water resources, the Bureau of Reclamation (Reclamation) provides important leadership, technical, and financial resources in water management, serving as the West's "water broker" (Bowersox 2000; Pisani 2003). In recent years, growing numbers of constituencies using water and the over-allocation of water resources have contributed to conflict over the resource in the American West (National Research Council 2004). Although the conflicts arise from many sources, one common theme is that Reclamation managers often must make decisions about water use and allocation when scientific studies provide uncertain or competing recommendations. We conducted a preliminary study of Reclamation water managers and water scientists to try to understand the approaches or techniques they use or consider useful for dealing with scientific conflicts over water allocation and how these compare to techniques found in the relevant literature. We report the results of (1) an electronic survey of Reclamation senior managers and (2) a panel discussion amongst Reclamation senior managers as to the current institutional capabilities for managing diverging scientific findings in water dispute resolution processes. We conclude with a discussion of the strengths and weaknesses of the different tools and techniques managers reported in the survey and in the panel discussion.

  9. CEBAF - environmental protection program plan

    International Nuclear Information System (INIS)

    1995-01-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan

  10. ESnet Program Plan 1994

    Energy Technology Data Exchange (ETDEWEB)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  11. ESnet Program Plan 1994

    International Nuclear Information System (INIS)

    Merola, S.

    1994-01-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet's development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet's development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet's connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking

  12. Effects of cluster land reclamation projects on storm surge in Jiaojiang Estuary, China

    Directory of Open Access Journals (Sweden)

    Zhi-lin Sun

    2017-01-01

    Full Text Available Variations in coastline geometry caused by coastal engineering affect tides, storm surges, and storm tides. Three cluster land reclamation projects have been planned for construction in the Jiaojiang Estuary during the period from 2011 to 2023. They will cause significant changes in coastline geometry. In this study, a surge-tide coupled model was established based on a three-dimensional finite-volume coastal ocean model (FVCOM. A series of numerical experiments were carried out to investigate the effects of variations in coastline geometry on tides, storm surges, and storm tides. This model was calibrated using data observed at the Haimen and Ruian gauge stations and then used to reproduce the tides, storm surges, and storm tides in the Jiaojiang Estuary caused by Typhoon Winnie in 1997. Results show that the high tide level, peak storm surge, and high storm tide level at the Haimen Gauge Station increased along with the completion of reclamation projects, and the maximum increments caused by the third project were 0.13 m, 0.50 m, and 0.43 m, respectively. The envelopes with maximum storm tide levels of 7.0 m and 8.0 m inside the river mouth appeared to move seaward, with the latter shifting 1.8 km, 3.3 km, and 4.4 km due to the first project, second project, and third project, respectively. The results achieved in this study contribute to reducing the effects of, and preventing storm disasters after the land reclamation in the Jiaojiang Estuary.

  13. 30 CFR 75.161 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 75.161 Section 75... Provision] § 75.161 Plans for training programs. Each operator must submit to the district manager, of the Coal Mine Safety and Health District in which the mine is located, a program or plan setting forth what...

  14. Microbes from mined sites: Harnessing their potential for reclamation of derelict mine sites

    International Nuclear Information System (INIS)

    Thavamani, Palanisami; Samkumar, R. Amos; Satheesh, Viswanathan; Subashchandrabose, Suresh R.; Ramadass, Kavitha; Naidu, Ravi; Venkateswarlu, Kadiyala; Megharaj, Mallavarapu

    2017-01-01

    Derelict mines pose potential risks to environmental health. Several factors such as soil structure, organic matter, and nutrient content are the greatly affected qualities in mined soils. Soil microbial communities are an important element for successful reclamation because of their major role in nutrient cycling, plant establishment, geochemical transformations, and soil formation. Yet, microorganisms generally remain an undervalued asset in mined sites. The microbial diversity in derelict mine sites consists of diverse species belonging to four key phyla: Proteobacteria, Acidobacteria, Firmicutes, and Bacteroidetes. The activity of plant symbiotic microorganisms including root-colonizing rhizobacteria and ectomycorrhizal fungi of existing vegetation in the mined sites is very high since most of these microbes are extremophiles. This review outlines the importance of microorganisms to soil health and the rehabilitation of derelict mines and how microbial activity and diversity can be exploited to better plan the soil rehabilitation. Besides highlighting the major breakthroughs in the application of microorganisms for mined site reclamation, we provide a critical view on plant−microbiome interactions to improve revegetation at the mined sites. Also, the need has been emphasized for deciphering the molecular mechanisms of adaptation and resistance of rhizosphere and non-rhizosphere microbes in abandoned mine sites, understanding their role in remediation, and subsequent harnessing of their potential to pave the way in future rehabilitation strategies for mined sites. - Highlights: • Abandoned mines pose potential risks to human and environmental health. • Re-establishment of a self-sustaining vegetative cover at derelict mines is a major challenge. • Soil microbial communities are very important for successful reclamation of mined sites. • Role of microorganisms in soil function in derelict mines needs to be understood.

  15. 78 FR 16706 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2013-03-18

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  16. 75 FR 8106 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2010-02-23

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  17. 75 FR 82066 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2010-12-29

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  18. 76 FR 73674 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2011-11-29

    ... Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate for Federal water resources planning...

  19. 75 FR 67993 - Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report

    Science.gov (United States)

    2010-11-04

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Hydropower Resource Assessment at Existing... comment the ``Hydropower Resource Assessment at Existing Reclamation Facilities'' (HRA) Draft Report. The HRA is an assessment of the economic and technical potential for hydropower development at existing...

  20. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  1. Reclamation of abandoned underground mines in the United Kingdom

    International Nuclear Information System (INIS)

    Brook, D.

    1994-01-01

    Since 1980, the Derelict Land Grant program has supported reclamation of abandoned mines in the United Kingdom. The stabilization of large-scale limestone mines in the West Midlands has stimulated the development of new methods of bulk infilling using waste materials as thick pastes. Colliery spoil rock paste develops strengths of 10 to 20 kPa to support roof falls and prevent crown hole collapse. Pulverized fuel ash rock paste develops strengths over 1 MPa where lateral support to pillars is required. Smaller scale mine workings in the West Midlands and elsewhere have been stabilized using conventional grouting techniques, hydraulic and pneumatic stowing, foamed-concrete infill, bulk excavation with controlled backfill, and structural support using bolts, mesh, and shotcrete

  2. Hanford Surplus Facilities Program plan

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1989-09-01

    The Hanford Surplus Facilities Program is responsible for the safe and cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The management of these facilities requires a surveillance and maintenance program to keep them in a safe condition and development of a plan for ultimate disposition. Criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy-Richland Operations Office, Defense Facilities Decommissioning Program Office, and are consistent with the Westinghouse Hanford Company commitment to decommission the Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities to the end of disposition

  3. Preretirement Programs within Service Firms: Existing and Planned Programs.

    Science.gov (United States)

    Siegel, Sidney R.; Rives, Janet M.

    1980-01-01

    A study of 300 nonmanufacturing firms' current and projected preretirement programs indicated that (1) personnel departments have primary responsibility for existing programs, (2) focus is changing from financial planning to psychological counseling, and (3) such programs benefit the company as well as the employee. (SK)

  4. Problems getting from the laboratory to the field: Reclamation of an AML site

    International Nuclear Information System (INIS)

    Dick, W.A.; Stehouwer, R.C.

    1994-01-01

    Acid and toxic abandoned mineland sites provide an opportunity whereby flue gas desulfurization (FGD) by-product can be beneficially used as a reclamation amendment material. Studies are needed to compare the effectiveness of FGD by-product, as compared with resoil, for reclamation purposes. Initial studies provided information about the chemical and physical properties of the FGD by-product and how to transport and blend the FGD by-product with yard waste compost. Greenhouse studies indicated that rates of 125 dry tons/acre of FGD and 50 dry tons/acre of yard waste compost would provide optimum results for reclamation of acid and toxic spoil contained at the Fleming abandoned mineland (AML) site. Their results showed that heavy metal loading rates were much lower using the FGD/compost mixture than using resoil material. Dioxin in the mixture was also less than the 5 ppt level considered as normal background. The technical problems of using FGD by-product for reclamation of an AML site were solved. However, considerable efforts to educate the public about the merits of reclaiming the Fleming AML site using this FGD/compost mixture were required before initiating field reclamation activities. Education efforts must continue if FGD by-products are to achieve general acceptance as a reclamation alternative to resoil in cases where resoil is of scarce supply

  5. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  6. Environmental Restoration Remedial Actions Program Field Office Work Plan

    International Nuclear Information System (INIS)

    1989-02-01

    The Environmental Restoration Remedial Actions (ERRA) Program was established by DP to comply with regulations for characterization and cleanup of inactive waste sites. The program specifically includes inactive site identification and characterization, technology development and demonstration, remedial design and cleanup action, and postclosure activities of inactive radioactive, chemically hazardous, and mixed waste sites. It does not include facility decontamination and decommissioning activities; these are included in a parallel program, Environmental Restoration Decontamination and Decommissioning (ERD and D), also managed by DP. The ERRA program was formally established in fiscal year (FY) 1988 at the Hanford Site to characterize and remediate inactive waste sites at Hanford. The objectives, planned implementation activities, and management planning for the ERRA Program are contained in several planning documents. These documents include planning for the national program and for the Hanford Program. This summary describes the major documents and the role and purpose of this Field Office Work Plan (FOWP) within the overall hierarchy of planning documents. 4 refs., 7 figs., 8 tabs

  7. FY97 Geothermal R&D Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-09-01

    This is the Sandia National Laboratories Geothermal program plan. This is a DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. This one is of special interest for historical work because it contains what seems to be a complete list of Sandia geothermal program publications (citations / references) from about 1975 to late 1996. (DJE 2005)

  8. 49 CFR 613.200 - Statewide transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  9. National Waste Terminal Storage Program: planning and control plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the NWTS program planning and control plan is to provide the information necessary for timely and effective OWI management decisions. Purpose is to describe the concepts and techniques that will be utilized by OWI to establish structured, completely planned and controlled technical, cost, and schedule NWTS baselines from which performance or progress can be accurately measured

  10. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  11. 25 CFR 87.9 - Programming aspects of plans.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Programming aspects of plans. 87.9 Section 87.9 Indians... JUDGMENT FUNDS § 87.9 Programming aspects of plans. In assessing any tribal programming proposal the... such reservation residents; the nature of recent programming affecting the subject tribe or group and...

  12. Oil sands tailings technology : understanding the impact to reclamation

    Energy Technology Data Exchange (ETDEWEB)

    Mamer, M. [Suncor Energy Inc., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed tailings management techniques at oil sands mines and their effects on reclamation schedules and outcomes. The layer of mature fine tailings (MFT) that forms in tailings ponds does not settle within a reasonable time frame, requiring more and larger tailings ponds for storing MFT. Consolidated tailings (CT) technology was developed to accelerate the consolidation of MFT, although the process nonetheless takes decades. CT is produced from mixing tailings sand, gypsum, and MFT to create a mixture that will consolidate more quickly and release water. However, CT production is tied to the extraction process, making it applicable only when the plant is operational, and a precise recipe and accurate injection are required for CT to work. In tailings reduction operations (TRO), a new approach to tailings management, MFT is mixed with a polymer flocculant, deposited in thin layers, and allowed to dry. TRO has a significant advantage over CT in that the latter takes up to 30 years to consolidate to a trafficable surface compared to weeks for TRO. TRO allows MFT to be consumed more quickly than it is produced, reducing need to build more tailings ponds, operates independent of plant operations, accelerates the reclamation time frame, and offers enhanced flexibility in final tailings placement sites. TRO also creates a dry landscape, to which well established reclamation techniques can be applied. Dried MFT is a new material type, and research is exploring optimum reclamation techniques. 2 figs.

  13. Containment integrity research program plan

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents a plan for research on the question of containment performance in postulated severe accident scenarios. It focuses on the research being performed by the Structural and Seismic Engineering Branch, Division of Engineering, Office of Nuclear Regulatory Research. Summaries of the plans for this work have previously been published in the ''Nuclear Power Plant Severe Accident Research Plan'' (NUREG-0900). This report provides an update to reflect current status. This plan provides a summary of results to date as well as an outline of planned activities and milestones to the contemplated completion of the program in FY 1989

  14. Program Plan: field radionuclide migration studies in Climax granite

    International Nuclear Information System (INIS)

    Isherwood, D.; Raber, E.; Coles, D.; Stone, R.

    1980-01-01

    This Program Plan describes the field radionuclide migration studies we plan to conduct in the Climax granite at the Nevada Test Site. Laboratory support studies are included to help us understand the geochemical and hydrologic processes involved in the field. The Program Plan begins with background information (Section 1) on how this program fits into the National Waste Terminal Storage Program Plan and discusses the needs for field studies of this type. The objectives stated in Section 2 are in direct response to these needs, particularly the need to determine whether laboratory studies accurately reflect actual field conditions and the need for field testing to provide a data base for verification of hydrologic and mass transport models. The technical scope (Section 3) provides a work breakdown structure that integrates the various activities and establishes a base for the technical approach described in Section 4. Our approach combines an interactive system of field and laboratory migration experiments with the use of hydrologic models for pre-test predictions and data interpretation. Section 5 on program interfaces identifies how information will be transferred to other related DOE projects. A schedule of activities and major milestones (Section 6) and the budget necessary to meet the project objectives (Section 7) are included in the Program Plan. Sections 8 and 9 contain brief descriptions of how the technical and program controls will be established and maintained and an outline of our quality assurance program. This program plan is an initial planning document and provides a general description of activities. An Engineering Test Plan containing detailed experimental test plans, an instrumentation plan and equipment design drawings will be published as a separate document

  15. The impacts of land reclamation on suspended-sediment dynamics in Jiaozhou Bay, Qingdao, China

    Science.gov (United States)

    Gao, Guan Dong; Wang, Xiao Hua; Bao, Xian Wen; Song, Dehai; Lin, Xiao Pei; Qiao, Lu Lu

    2018-06-01

    A three-dimensional, high-resolution tidal model coupled with the UNSW sediment model (UNSW-Sed) based on Finite Volume Coastal Ocean Model (FVCOM) was set up to study the suspended-sediment dynamics and its change in Jiaozhou Bay (JZB) due to land reclamation over the period 1935 to 2008. During the past decades, a large amount of tidal flats were lost due to land reclamation. Other than modulating the tides, the tidal flats are a primary source for sediment resuspensions, leading to turbidity maxima nearshore. The tidal dynamics are dominant in controlling the suspended-sediment dynamics in JZB and have experienced significant changes with the loss of tidal flats due to the land reclamation. The sediment model coupled with the tide model was used to investigate the changes in suspended-sediment dynamics due to the land reclamation from 1935 to 2008, including suspended-sediment concentrations (SSC) and the horizontal suspended-sediment fluxes. This model can predict the general patterns of the spatial and temporal variation of SSC. The model was applied to investigate how the net transport of suspended sediments between JZB and its adjacent sea areas changed with land reclamation: in 1935 the net movement of suspended sediments was from JZB to the adjacent sea (erosion for JZB), primarily caused by horizontal advection associated with a horizontal gradient in the SSC; This seaward transport (erosion for JZB) had gradually declined from 1935 to 2008. If land reclamation on a large scale is continued in future, the net transport between JZB and the adjacent sea would turn landward and JZB would switch from erosion to siltation due to the impact of land reclamation on the horizontal advection of suspended sediments. We also evaluate the primary physical mechanisms including advection of suspended sediments, settling lag and tidal asymmetry, which control the suspended-sediment dynamics with the process of land reclamation.

  16. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  17. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  18. 30 CFR 886.27 - What special procedures apply to Indian lands not subject to an approved Tribal reclamation program?

    Science.gov (United States)

    2010-07-01

    ... OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND... mitigate emergency situations or extreme danger situations arising from past mining practices and begin... Indian tribe and the Bureau of Indian Affairs office having jurisdiction over the Indian lands. (d) If a...

  19. Bio-Reclamation of Strategic and Energy Critical Metals from Secondary Resources

    Directory of Open Access Journals (Sweden)

    Sadia Ilyas

    2017-06-01

    Full Text Available Metals with an average crustal abundance of <0.01 ppm, which are high in supply shortage due to soaring demand, can, under the excessive environmental risk and <1% recycling rate of their production, be termed as ‘critical’ in a limited geo-boundary. A global trend to the green energy and low carbon technologies with geopolitical scenario is challenging for the sustainable reclamation of these metals from secondary resources. Among the available processes, bio-reclamation can be a sustainable technique for extracting and concentrating these metals. Therefore, in the present paper, the potential reclamation of critical metals (including rare earth elements, precious metals, and a common nuclear fuel element, uranium via their interaction with microbe/s has been reviewed.

  20. 75 FR 38833 - Walker River Basin Acquisition Program

    Science.gov (United States)

    2010-07-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Walker River Basin Acquisition Program AGENCY... (Reclamation) is canceling work on the Environmental Impact Statement (EIS) for the Walker River Basin... Walker River, primarily for irrigated agriculture, have resulted in a steadily declining surface...

  1. 36 CFR 9.39 - Reclamation requirements.

    Science.gov (United States)

    2010-07-01

    ... MINERALS MANAGEMENT Non-Federal Oil and Gas Rights § 9.39 Reclamation requirements. (a) Within the time... Director consistent with the unit purpose and management objectives; (ii) Removing all other man-made... to a condition which does not jeopardize visitor safety or public use of the unit. ...

  2. 78 FR 67393 - Change in Discount Rate for Water Resources Planning

    Science.gov (United States)

    2013-11-12

    ... Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate...

  3. Reclamation of nuclear contaminated urban areas

    International Nuclear Information System (INIS)

    Roed, J.; Andersson, Kasper; Sandalls, J.

    1991-01-01

    From a knowledge of the distribution and levels of gamma-ray emitting radionuclides on urban surfaces, the dose rate at various locations in an urban complex can be calculated. The information produced provides a quantitative guide of where decontamination would be of greatest benefit in terms of dose reduction. The efficiency and cost of practicable reclamation and decontamination procedures has been considered and, combined with dose rate calculations before and after treatment, a strategy for reclamation of various urban contamination scenarios has been developed. The study has shown that decontamination of green areas and streets is relatively highly cost-effective in terms of dose reduction and would rank highly in a list of priorities. Roofs are shown to make a significant contribution to dose rate but decontamination of roofs is difficult and not highly cost-effective. Decontamination of walls would rank lowly in a list of priorities, since they represent large areas carrying very little contamination. (3 refs., 4 tabs.)

  4. OCCUPATIONAL EDUCATION--PLANNING AND PROGRAMMING. VOLUME TWO.

    Science.gov (United States)

    KOTZ, ARNOLD

    ADDITIONAL POSITION PAPERS BASED ON INFORMATION GATHERED IN THE RECONNAISSANCE SURVEYS OF PLANNING AND PROGRAMING IN OCCUPATIONAL EDUCATION, REPORTED IN VOLUME ONE (VT 005 041), ARE PRESENTED. PART IV, CONCERNED WITH PROGRAM STRUCTURE AND BUDGETING AND THEIR RELATION TO THE PLANNING PROCESS, INCLUDES THE PAPERS--(1) "CURRENT POLICIES AND…

  5. Optimisation of reclamation approaches to land affected by surface coal mining

    Energy Technology Data Exchange (ETDEWEB)

    Kabrna, M.; Hendrychova, M. [Vyzkumny ustav pro hnede uhli a.s. (Czech Republic); Czech Univ. of Life Sciences, Prague (Czech Republic). Faculty of Environmental Science; Salek, M. [Czech Univ. of Life Sciences, Prague (Czech Republic). Faculty of Environmental Science; Rehor, M. [Vyzkumny ustav pro hnede uhli a.s. (Czech Republic)

    2009-07-01

    Since the 1950s, reclamation of land affected by brown coal mining in the Czech Republic has been conducted. Since this time, there has been significant improvement in quality development of reclamation measures. This paper discussed the results of different studies where technically reclaimed sites as well as naturally developed sites were investigated. The paper discussed the methodology of the study as well as results of succession versus reclamation and next preferences. One of the studies that was examined involved four groups of animals that have a close relation to soil and plant vegetation. These included ground beetles, bugs, molluscs, and birds. This study found that the spontaneously developed sites could be characterized by the same or a higher biodiversity than those technically reclaimed. The second study examined bird nest preferences either to domestic or to exotic trees. The results showed that although exotic trees dominate on reclaimed sites, the birds preferred the domestic trees for nesting. It was concluded that the natural succession could play a significant role within reclamation practices, particularly on those sites where higher species diversity is desirable. 10 refs., 2 figs.

  6. Staunton 1 reclamation demonstration project. Aquatic ecosystems. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Vinikour, W. S.

    1981-02-01

    To provide long-term indications of the potential water quality improvements following reclamation efforts at the Staunton 1 Reclamation Demonstration Project, macroinvertebrates were collected from three on-site ponds and from the receiving stream (Cahokia Creek) for site drainage. Implications for potential benthic community differences resulting from site runoff were disclosed, but macroinvertebrate diversity throughout Cahokia Creek was limited due to an unstable, sandy substrate. The three ponds sampled were the New Pond, which was created as part of the reclamation activities; the Shed Pond, which and the Old Pond, which, because it was an existing, nonimpacted pond free of site runoff, served as a control. Comparisons of macroinvertebrates from the ponds indicated the potential for the New Pond to develop into a productive ecosystem. Macroinvertebrates in the New Pond were generally species more tolerant of acid mine drainage conditions. However, due to the present limited faunal densities and the undesirable physical and chemical characteristics of the New Pond, the pond should not be stocked with fish at this time.

  7. Drivers, trends, and potential impacts of long-term coastal reclamation in China from 1985 to 2010

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Bo; Wu, Wenting; Yang, Zhaoqing; Zhou, Yunxuan

    2016-03-01

    Driven by rapid economic development, population growth, and urbanization, China has experienced severe coastal land reclamation over the last decades, which resulted in significant loss of coastal wetland and wildlife habitat, and degradation of marine ecosystems. This study used advanced remote-sensing techniques to analyze the spatial and temporal distributions of coastal reclamation in China and investigated the relationships between coastal land reclamation and coastal economy, population growth, and urbanization. Analysis of long-term Landsat images time series from 1985 to 2010 in 5-year intervals, in combination with remotely sensed image techniques, indicated a sharp increasing trend of land reclamation after 2005, which accounted for over 35% of China’s total reclamation during the 25-year period since 1985. High-intensity coastal reclamation in China was mainly driven by the booming economy associated with urbanization and industrial development in the coastal region. Analysis indicated that coastal land reclamation is closely correlated with the GDP per capita in China. Study results of Landsat images showed that 754,697 ha of coastal wetlands have been reclaimed across all coastal provinces and metropolises from 1985 to 2010, at an annual rate of 5.9%. Coastal areas within the three major economic zones (Bohai Bay, Yangtze River Delta, and Pearl River Delta) were found to generally have higher reclamation rates. For example, the built-up area in Shanghai, which is located in the Yangtze River Delta, increased more than five times from 1985 to 2010. Approximately 35% of the reclamation occurred in Bohai Bay, in which the CRI between 2005 and 2010 was three times higher than the average CRI over the 25-year period.

  8. WIPP facility representative program plan

    International Nuclear Information System (INIS)

    1994-01-01

    This plan describes the Department of Energy (DOE), Carlsbad Area Office (CAO) facility representative (FR) program at the Waste Isolation Pilot Plant (WIPP). It provides the following information: (1) FR and support organization authorities and responsibilities; (2) FR program requirements; and (3) FR training and qualification requirements

  9. 30 CFR 77.107-1 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 77.107-1 Section... COAL MINES Qualified and Certified Persons § 77.107-1 Plans for training programs. Each operator must..., a program or plan setting forth what, when, how, and where the operator will train and retrain...

  10. Investigation of the Results of Combined Reclamation on the Particular Stages of Grain Matrix Recovery

    Directory of Open Access Journals (Sweden)

    Łucarz M.

    2016-12-01

    Full Text Available In this article, there were presented the results of research on combined mechanical and thermal regeneration of waste moulding sand with furfuryl resin originated from one of national foundries manufacturing aluminium alloys castings. Attempts of mechanical reclamation were led on the REGMAS reclaimer enabling to realize preliminary and primary reclamation with use of two modes of mechanical interactions on waste moulding sand. In the first attempt the reclaimer worked without any additional regenerating elements, and as the second solution, the reclaimer operated with additional crushing and abrasive elements to increase the result of primary reclamation. Thermal reclamation was led in the prototypic thermal reclaimer, enabling to fully control the process of grain matrix recovery. As a result of completed investigations the small efficiency of mechanical reclamation was determined. However, use of combined regeneration allowed for obtaining grain matrix of high purity. Thermal regeneration was conducted in prototypic thermal reclaimer. Evaluation of reclaim (reclaimed material quality was carried out in the way of iginition losses and grain-size analysis, surface morphology and also by executing of strength testing of moulding sand prepared on obtained grain matrix for the particular reclamation operations.

  11. International Photovoltaic Program Plan. Volume II. Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Costello, D.; Koontz, R.; Posner, D.; Heiferling, P.; Carpenter, P.; Forman, S.; Perelman, L.

    1979-12-01

    This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.

  12. Greening reclamation of arid region

    Energy Technology Data Exchange (ETDEWEB)

    Kamichika, Makio [Tottori Univ. (Japan)

    1989-01-20

    Arid regions occupy a third of the whole land in the world, and desertification in the rimland makes a problem become more acute. It is also a problem that the large part of such areas is distributed in developing countries. Desertification is defined as a phenomenon, by which the ecological system is degenerated by the change of weather conditions and the pressure of human beings and livestock, and productivity of land is markedly deteriorated. In order to prevent desertification and to promote greening reclamation and agricultural development, it is necessary to analyze desertification mechanism in detail. Artificial factors are overpopulation, too much pasturage, and conversion of grassland into farmland. Natural environmental factors are weather conditions, water resources, soil conditions, etc. It is also important for greening reclamation and development of farm land to evaluate the amount of meteorological resources (such as water resources, energy resources, etc.) and to search for the possibility of their utilization. Because of major condition to grow plants is water environment, investigation and development of water resources are important. If a project ignores the cycle of the ecological system, it might be in danger of retrogradation toward desertification. 8 refs., 10 figs., 4 tabs.

  13. Plutonium discharges to the sanitary sewer: Health impacts at the Livermore Water Reclamation Plant

    International Nuclear Information System (INIS)

    Balke, B.K.

    1993-01-01

    The Lawrence Livermore National Laboratory (LLNL) is the largest discharger of sewage treated by the Livermore Water Reclamation (LWRP), contributing approximately 7% by volume of the LWRP influent LILNL operations, as potential sources both of industrial pollutants and radioactivity, are therefore of particular concern to the LWRP. For this reason, LLNL has maintained vigorous wastewater discharge control and monitoring programs. In particular, the monitoring program has demonstrated that, except in a few rare instances, the concentration of contaminants in LLNL effluent have always remained below the appropriate regulatory standards. The exceptions have generally been due to inadvertent discharges of metals-bearing solutions produced by metal plating or cleaning operations

  14. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  15. Metal concentrations and mobility in marine sediment and groundwater in coastal reclamation areas: A case study in Shenzhen, China

    International Nuclear Information System (INIS)

    Chen Kouping; Jiao, Jiu J.

    2008-01-01

    The concentrations of metals in the buried marine sediment and groundwater were differently affected by land reclamation. Nine metals (V, Cr, Mn, Co, Ni, Cu, Zn, Cd and Pb) in sediment and coastal groundwater from reclamation areas in Shenzhen were examined. The gradually decreased concentrations (V, Cr, Mn, Ni, Cu, Zn) in sediment and relatively higher concentrations (V, Cr, Mn, Co, Ni, Cu and Cd) in groundwater within reclamation areas were observed. The increase of V, Cr, Mn, Ni, Cu and Cd concentrations in groundwater within reclamation areas subsequently after land reclamation should be resulted from the mobilization of these metals accumulated in the sediment. These metals appear to be easily mobilized from solid phase to solution phase after reclamation. The physico-chemical changes such as reduction in pH and salinity in water environment induced by land reclamation appear to be responsible for metal mobility in the sediment-groundwater system. - Metals in coastal groundwater and marine sediment are affected by land reclamation

  16. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  17. Investigations of physicochemical properties of dusts generated in mechanical reclamation process of spent moulding sands with alkaline resins

    Directory of Open Access Journals (Sweden)

    R. Dańko

    2014-03-01

    Full Text Available Mechanical reclamation processes of spent moulding sands generate large amounts of post-reclamation dusts mainly containing rubbed spent binding agents and quartz dusts. The amount of post-reclamation dusts, depending in the reclamation system efficiency and the reclaim dedusting system, can reach 5%-10% in relation to the total reclaimed spent moulding sand. The proper utilization of such material is a big problem facing foundries these days. This study presents the results of investigations of physicochemical properties of post- reclamation dusts. All tested dusts originated from various Polish cast steel plants applying the mechanical reclamation process of moulding sands with alkaline resins, obtained from different producers. Different dusts, delivered from foundries, were tested to determine their chemical composition, granular characterization, physicochemical and energetic properties. Presented results confirmed assumptions that it is possible to utilize dusts generated during mechanical reclamation of used sands with organic resins as a source of energy.

  18. Disputes over science and dispute resolution approaches - A survey of Bureau of Reclamation employees

    Science.gov (United States)

    Burkardt, Nina; Ruell, Emily W.

    2012-01-01

    Water resources in parts of the Western United States are over-allocated, which intensifies the pressure to support water management decisions with strong scientific evidence. Because scientific studies sometimes provide uncertain or competing results or recommendations, science can become a source of disputes during decision-making processes. The Bureau of Reclamation (Reclamation) is an important water manager in the Western United States, and Reclamation decision processes are often contested by a variety of affected constituencies. We conducted a Web-based survey of Reclamation employees to determine (1) which types of disputes over science are occurring and how common they are, (2) which approaches have been used by Reclamation to try to resolve these different types of disputes, (3) how useful Reclamation employees find these approaches at resolving these types of disputes, (4) the final outcomes of these disputes and the decision-making processes that were hindered by the disputes over science, and (5) the potential usefulness of several different types of dispute resolution resources that Reclamation could provide for employees that become involved in disputes over science. The calculated minimum response rate for the survey was 59 percent. Twenty-five percent of respondents indicated that they had been involved in a dispute over science while working at Reclamation. Native species and species listed under the Endangered Species Act of 1973 were the most common issue types reported in these disputes over science. Survey respondents indicated that they used a variety of approaches to resolve disputes over science and rated most approaches as either neutral or somewhat helpful in these endeavors. Future research is needed to determine whether there are additional variables underlying these disputes that were not measured in this survey that may identify when dispute resolution methods are most effective, or whether resolving aspects of these disputes, such as

  19. Reclamation of the mining areas by Nuclemon

    International Nuclear Information System (INIS)

    Torezan, M.J.

    1987-01-01

    This work refers to the reclamation of mine land, fundamental condition to the preservation of the environment. The NUCLEMON - ''Nuclebras de Monazita e Associadas Ltda is dedicated to prospecting activities, exploration, exploitation and industrialization of heavy minerals, ilmenite, monazite, zirconite and rutil. The process of reclamation of the areas starts at the same tinic as the exploitation. The excavation isn't made with explosives, also durung emission doesn't occur. The drainning of pit is made by the pumping of wather for the pits rehabilitation, avoiding the pumping of the surrounding. At the completation of the exploitation restarts the agricultural activity al-ready existing in the area. Sometimes the owner of the soil prefers to preserve some of the pits for the formation of small lakes for the use of wild focal. (C.D.G.) [pt

  20. Design of 90-mgd wastewater reclamation plant

    International Nuclear Information System (INIS)

    Cain, C.B.; Kluesener, J.W.; Lazarus, E.

    1981-01-01

    Ninety MGD of municipal secondary effluent is to be reclaimed for use as cooling water in the Palo Verde Nuclear Generating Station in Arizona. The water reclamation plant design criteria are presented for nitrification, lime-soda softening, filtration, and sludge processing. In-pipe storage is used for flow equalization. Forced air down-draft trickling filters with computer-controlled recycle are used for nitrification. Effluent recirculation is used to maintain constant sludge blanket dept in the upflow solids contact clarifier softening units. An influent flow-splitting, gravity-backwash, dual-media filter is used for final suspended solids removal. Rheological data was used in the hydraulic design of sludge piping. Computerized automatic flushing also aids in preventing sludge pumping problems. Reclamation plant design and construction are integrated in one Engineering-Procurement-Construction project conducted by a single company. 5 refs

  1. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  2. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  3. Influence of the Reclamation Process Intensity in the REGMAS Reclaimer on the Purification Degree of the High-silica Matrix

    Directory of Open Access Journals (Sweden)

    Skrzyński M.

    2016-03-01

    Full Text Available The investigation results of the reclamation of spent moulding sands with furfuryl resin are presented in this paper. The reclamation process was performed in the secondary reclamation chamber of the REGMAS 1.5 vibratory reclaimer. 70 kg portions of moulding sands, previously subjected to the primary reclamation and dedusting, were used. The secondary reclamation was performed in two stages: the first consisted of determining the reclaimer intensity at various reclamation times (5 min, 10 min and 15 min and various electrovibrator frequencies (40 Hz, 50 Hz and 60 Hz, the second consisted of determining the influence of additional crushing elements on the intensity of processes.

  4. 24 Command Fire Improvement Action Program Plan

    International Nuclear Information System (INIS)

    GRIFFIN, G.B.

    2000-01-01

    Fluor Hanford (FH) is responsible for providing support to the Department of Energy Richland Operations Office (RL) in the implementation of the Hanford Emergency Preparedness (EP) program. During fiscal year 2000, a number of program improvements were identified from various sources including a major range fire (24 Command Fire). Evaluations of the emergency preparedness program have confirmed that it currently meets all requirements and that performance of personnel involved is good, however the desire to effect continuous improvement resulted in the development of this improvement program plan. This program plan defines the activities that will be performed in order to achieve the desired performance improvements

  5. The use of lichens in post-smelting dumps reclamation - preliminary results of experimental cultivation of selected species on slag substrate

    Science.gov (United States)

    Rola, Kaja; Osyczka, Piotr

    2017-11-01

    Conventional reclamation interventions of post-smelting slag dumps being undertaken so far either failed or produced poor results. Certain lichens, especially of the genus Cladonia, are known as effective colonisers of bare ground in anthropogenic habitats. The paper presents preliminary results of the experiment aimed at the evaluation of lichen usefulness in reclamation interventions. The cultivation in vivo involving transplantation of lichens directly on slag substrate was established in 2015. Five species, i.e. Cladonia rei, C. cariosa, C. pyxidata, C. subulata, C. macilenta, were transplanted into 32 cuvettes filled with sterilised slag substrate. The sample weight of 2 and 6 g were used and half of cuvettes were regularly supplied with 2% malt solution. The first important symptoms at the present stage of the experiment are as follow: the growth of thalli has appeared only in the case of first three species; C. rei shows the most effective development; cuvettes with 6 g sample weight are characterized by higher coverage of fresh lichen thalli; lichen biomass are visually higher in cuvettes treated with malt solution. The results give us reason to believe that lichens could be successfully used as an alternative element during planning of slag dumps reclamation in the future.

  6. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  7. NASA Year 2000 (Y2K) Program Plan

    Science.gov (United States)

    1998-01-01

    NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.

  8. Quality-Assurance Program Plan

    International Nuclear Information System (INIS)

    Kettell, R.A.

    1981-05-01

    This Quality Assurance Program Plan (QAPP) is provided to describe the Quality Assurance Program which is applied to the waste management activities conducted by AESD-Nevada Operations at the E-MAD Facility located in Area 25 of the Nevada Test Site. The AESD-Nevada Operations QAPP provides the necessary systematic and administrative controls to assure activities that affect quality, safety, reliability, and maintainability during design, procurement, fabrication, inspection, shipments, tests, and storage are conducted in accordance with established requirements

  9. 45 CFR 235.62 - State plan requirements for training programs.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false State plan requirements for training programs. 235... ADMINISTRATION OF FINANCIAL ASSISTANCE PROGRAMS § 235.62 State plan requirements for training programs. A State plan under title I, IV-A, X, XIV, or XVI (AABD) of the Act must provide for a training program for...

  10. 我国农村土地整治的发展态势与重点研究领域%Development Trend and Key Research Areas of Rural Land Reclamation

    Institute of Scientific and Technical Information of China (English)

    杨建波; 王莉; 刘润亚; 刘震宇; 谷颐乐

    2012-01-01

    Land reclamation is to increase the carrying capacity of land production, which is an ongoing and dynamic system engineering related to the implementation of resource environment, socio-economy, policy and systems. In the course of its development, land reclamation has undergone the origin, growth and harmonious development of China's land consolidation. In the development trend, the connotation of land reclamation has gradually enriched and its aim has tended to diversify. The legal support system is basically formed, regional and comprehensive features have been increasingly clear, and status and role has been growing. This paper proposes a strategic requirement for land reclamation from the perspectives of the country' s strategy, the change of the goals, the unified planning of urban and rural areas and the promotion of agricultural modernization, and the stage of socio-economic development, pointing out that the current land reclamation should improve the regulation of land planning system, establish the monitoring-evaluation-control system, promote the innovation of reclamation system and strengthen the construction and reclamation of ecological landscape. The results show that in the transition of land management from quantity to quantity, quality, management and protection of ecological change, land reclamation will develop in an increasingly comprehensive manner.%土地整治是为提高土地生产承载能力而实施的一项涉及到资源环境、社会经济、政策制度等多方面持续、动态的系统工程.从国家的战略部署、目标的现实转变、统筹城乡与促进农业现代化、社会经济发展阶段等方面对土地整治提出了战略需求,指出了当前土地整治应从完善整治规划编制体系、建立监测-评价-调控系统、推进整治制度创新、加强生态景观建设整治等4个领域来重点研究.结果表明:在土地管理从数量向数量、质量、生态管护转变中,土地整治越来越趋于综合化发展.

  11. Paste backfill of shallow mine workings for land reclamation in Canmore, Alberta

    International Nuclear Information System (INIS)

    Predika, R.; Beattie, A.; Beddoes, R.

    2008-01-01

    The coal mining history in Canmore, Alberta was presented along with reclamation activities that mine regulators carried out following closure of the mines after nearly 100 years of underground mining. The 7 seams that were mined commercially extend over distances of a few hundred feet and have been displaced by faults. Voids and collapsed rubble in shallow underground workings pose a risk of potential ground subsidence that can affect the stability of surface structures and infrastructure, including the planned development of the proposed Three Sisters Mountain Village on land above the abandoned mines. The village includes plans for 10,000 residential homes, 2 golf courses, and a resource centre. A mine works mitigation program involved drilling primary injection boreholes on a 15 m grid pattern to map the constraint zones in order to gain a better perspective of the subsidence issues as well as the effects of subsidence on structural stress and public safety. When determining mitigation criteria, various land uses and ranges of subsidence hazards were considered to be compatible with each land use. A paste backfill composed of aggregate from a locally available till overburden site was mixed with cement and injected into the void spaces. This paper described the cemented paste backfill injection method; confirmatory methods; maximum volume and pressure criteria; survey for ground uplift; and borehole camera and manual checks for cemented paste backfill in adjacent boreholes. Quality control testing was carried out by means of slump tests. It was concluded that cemented paste backfill mix could be used successfully to stabilize abandoned mine workings for land recovery. 8 refs., 5 tabs., 7 figs

  12. Indonesia's family planning program works toward self-sufficiency.

    Science.gov (United States)

    Kunii, C

    1989-07-01

    Started in 1970, the Indonesian Family Planning Program is doing very well. It is coordinated by the National Family Planning Coordinating Board (BKKBN). Many new acceptors are being enrolled daily. Its aim is to reduce to 1971 fertility rate of 50% in 1990. Strategy factors are listed. The following paper, "BKKBN and the Expanding Role of Private Sector Family Planning Services and Commercial Contraceptive Sales in Indonesia," by Dr. Haryono Suyono is introduced. Another article, "A breakthrough in Family Planning Promotional Strategy," by Mr. Sumarsono is also introduced. This article deals with the marketing aspect of Indonesia's family planning program.

  13. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  14. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste

  15. Disposal and reclamation of southwestern coal and uranium wastes

    International Nuclear Information System (INIS)

    Wewerka, E.M.

    1979-01-01

    The types of solid wastes and effluents produced by the southwestern coal and uranium mining and milling industries are considered, and the current methods for the disposal and reclamation of these materials discussed. The major means of disposing of the solid wastes from both industries is by land fill or in some instances ponding. Sludges or aqueous wastes are normally discharged into settling and evaporative ponds. Basic reclamation measures for nearly all coal and uranium waste disposal sites include solids stabilization, compacting, grading, soil preparation, and revegetation. Impermeable liners and caps are beginning to be applied to disposal sites for some of the more harmful coal and uranium waste materials

  16. SNL/CA Environmental Planning and Ecology Program Annual Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2007-02-01

    The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  17. REKUL'TIVATSIYA NARUSHENNYKH ZEMEL' V UGOL'NOY PROMYSHLENNOSTI [RECLAMATION OF DISTURBED LANDS IN THE COAL INDUSTRY

    Directory of Open Access Journals (Sweden)

    Harionovskij A.A.

    2017-09-01

    Full Text Available The urgency of the issue of reclamation of disturbed lands is due to the fact that coal mining by both open and underground methods is inevitably accompanied by exclusion from economic circulation and violation of lands for various purposes, by changing the terrain and forming an industrial landscape. The article contains information on the volumes of disturbance and reclamation of lands in the coal industry In the article the directions of reclamation and applied technologies, domestic developments and foreign experience are considered. It was noted that the priority areas for reclamation of disturbed lands in the coal industry are: agricultural, forestry and sanitary-hygienic. It is noted that the quality of the recultivated areas is not always at the proper level, which creates dif culties in their subsequent use. The main reasons for the low quality of reclamation are the lack of the necessary amount of initial data on the composition and properties of soil and rock mass of the dumps at the development stage of the reclamation projects, the lack of special technical means for performing remediation works at a high level, the lack of a landscape approach to the restoration of disturbed areas. Measures to prevent spontaneous combustion of rock dumps are laid in projects and are not implemented in practice in full, which leads to the occurrence of res. Two new developments in the eld of reclamation are presented: the microbiological method developed by MNIIECO TEK JSC, and the method for restoring the biological productivity of disturbed lands, proposed by the Scienti c Research Institute of Agricultural Problems of Khakassia SB RAAS. Identi ed problem issues in the eld of reclamation and a list of measures to improve the state of protection of land resources. In the article it is shown that in order to improve the state in the sphere of land resources protection in the coal industry, it is necessary to improve the applied mining technologies

  18. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented

  19. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  20. Solid waste programs Fiscal Year 1995 multi-year program plan/fiscal year work plan WBS 1.2.1

    International Nuclear Information System (INIS)

    McCarthy, M.M.

    1994-09-01

    The Hanford Mission Plan, Volume 1, Site Guidance identifies the need for the Solid Waste Program to treat, store, and dispose of a wide variety of solid material types consisting of multiple radioactive and hazardous waste classes. This includes future Hanford Site activities which will generate new wastes that must be handled as cleanup activities are completed. Solid wastes are typically categorized as transuranic waste, low level waste, low level mixed waste, and hazardous waste. To meet this need the Solid Waste Program has defined its mission as the following - receive, store, treat, decontaminate, and dispose of solid radioactive and nonradioactive dangerous wastes in a safe, cost effective and environmentally compliant manner. This workbook contains the program overview, program baselines and fiscal year work plan for the Solid Waste Program

  1. Strategic planning in an academic radiation medicine program.

    Science.gov (United States)

    Hamilton, J L; Foxcroft, S; Moyo, E; Cooke-Lauder, J; Spence, T; Zahedi, P; Bezjak, A; Jaffray, D; Lam, C; Létourneau, D; Milosevic, M; Tsang, R; Wong, R; Liu, F F

    2017-12-01

    In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations.

  2. 49 CFR 613.100 - Metropolitan transportation planning and programming.

    Science.gov (United States)

    2010-10-01

    ... programming. 613.100 Section 613.100 Transportation Other Regulations Relating to Transportation (Continued... Metropolitan Transportation Planning and Programming § 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, subpart C, shall be followed in complying with the requirements of...

  3. 7 CFR 22.304 - Multiyear planning and programming.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Multiyear planning and programming. 22.304 Section 22.304 Agriculture Office of the Secretary of Agriculture RURAL DEVELOPMENT COORDINATION Roles and Responsibilities of State Governments § 22.304 Multiyear planning and programming. State and multicounty...

  4. Women's experiences after Planned Parenthood's exclusion from a family planning program in Texas.

    Science.gov (United States)

    Woo, C Junda; Alamgir, Hasanat; Potter, Joseph E

    2016-04-01

    We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006-2010 (NSFG). (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Requiring low-income family planning patients to switch healthcare providers has adverse consequences. Copyright © 2016 Elsevier Inc. All rights reserved.

  5. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  6. The use of lichens in post-smelting dumps reclamation – preliminary results of experimental cultivation of selected species on slag substrate

    Directory of Open Access Journals (Sweden)

    Rola Kaja

    2017-01-01

    Full Text Available Conventional reclamation interventions of post-smelting slag dumps being undertaken so far either failed or produced poor results. Certain lichens, especially of the genus Cladonia, are known as effective colonisers of bare ground in anthropogenic habitats. The paper presents preliminary results of the experiment aimed at the evaluation of lichen usefulness in reclamation interventions. The cultivation in vivo involving transplantation of lichens directly on slag substrate was established in 2015. Five species, i.e. Cladonia rei, C. cariosa, C. pyxidata, C. subulata, C. macilenta, were transplanted into 32 cuvettes filled with sterilised slag substrate. The sample weight of 2 and 6 g were used and half of cuvettes were regularly supplied with 2% malt solution. The first important symptoms at the present stage of the experiment are as follow: the growth of thalli has appeared only in the case of first three species; C. rei shows the most effective development; cuvettes with 6 g sample weight are characterized by higher coverage of fresh lichen thalli; lichen biomass are visually higher in cuvettes treated with malt solution. The results give us reason to believe that lichens could be successfully used as an alternative element during planning of slag dumps reclamation in the future.

  7. Building Technologies Program Multi-Year Program Plan Research and Development 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for research and development, including residential and commercial integration, lighting, HVAC and water heating, envelope, windows, and analysis tools.

  8. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    Science.gov (United States)

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  9. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements

  10. The development of a field method for evaluating the success of reclamation efforts on abandoned mine lands

    International Nuclear Information System (INIS)

    Hunsberger, E.L.; Michaud, L.H.

    1994-01-01

    Abandoned Mine Lands (AML) are prevalent throughout Pennsylvania and in other areas of the US. Reclamation of these sites has been an ongoing concern of the Pennsylvania Department of Environmental Resources (PA DER) for over 20 yr. As the state of the technology improves, a variety of techniques have been utilized to rehabilitate AML. These reclamation efforts have resulted in vast improvements in the conditions of the sites, especially in water quality, erosion control, and aesthetic beauty. However, little work has been done to evaluate and document the success of individual reclamation techniques. Working with the Bureau of Abandoned Mine Reclamation, PA DER, a study was conducted at The Pennsylvania State University to address this need. The main goal of the project was to develop an evaluation system that could be easily carried out in the field by one person. The result of this study was the development of the Reclamation Success Evaluation System (RSES). The system utilizes three main parameters to evaluate reclamation success: (1) Surface Water Quality, (2) Extent of Erosion, and (3) Success of the Vegetative Cover. A series of guidelines and recommendations was developed for each of these evaluation parameters. The RSES was tested under field conditions by applying it to a watershed that contains both reclaimed and unreclaimed AML sites. This test proved that the RSES is an easily implemented and effective tool for evaluating the success of AML reclamation efforts. The system facilitates the comparison of reclamation efforts at different sites, it can be conducted by one person, and the results are easily interpreted

  11. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  12. Innovative wetland reclamation design case studies : the Suncor fen and pond 1 marsh

    Energy Technology Data Exchange (ETDEWEB)

    Daly, C.A. [Suncor Energy, Fort McMurray, AB (Canada); Price, J.; Rezanezhad, F. [Waterloo Univ., ON (Canada); Rochefort, L.; Graf, M. [Laval Univ., Quebec City, PQ (Canada); Russell, B. [BGC Engineering Inc., Calgary, AB (Canada)

    2010-07-01

    Suncor Energy Inc. is an energy company strategically focused in Canada's Athabasca oil sands region. The company has more than 40 years of experience in pioneering commercial development. This presentation discussed reclamation requirements for Suncor Energy. Reclamation objectives that were addressed in this presentation included operating approvals, biodiversity and meeting stakeholder expectations. Several photographs of reclaimed forest areas were shown along with 5 freshwater wetland types and wetland values. Two innovative wetland reclamation design case studies were also presented, described and illustrated, with particular reference to the Suncor fen and pond 1 marsh. It was concluded that future work will involve finalizing site investigation and designs, as well as construction, vegetation, and monitoring. figs.

  13. Strategic planning in an academic radiation medicine program

    Science.gov (United States)

    Hamilton, J.L.; Foxcroft, S.; Moyo, E.; Cooke-Lauder, J.; Spence, T.; Zahedi, P.; Bezjak, A.; Jaffray, D.; Lam, C.; Létourneau, D.; Milosevic, M.; Tsang, R.; Wong, R.; Liu, F.F.

    2017-01-01

    Background In this paper, we report on the process of strategic planning in the Radiation Medicine Program (rmp) at the Princess Margaret Cancer Centre. The rmp conducted a strategic planning exercise to ensure that program priorities reflect the current health care environment, enable nimble responses to the increasing burden of cancer, and guide program operations until 2020. Methods Data collection was guided by a project charter that outlined the project goal and the roles and responsibilities of all participants. The process was managed by a multidisciplinary steering committee under the guidance of an external consultant and consisted of reviewing strategic planning documents from close collaborators and institutional partners, conducting interviews with key stakeholders, deploying a program-wide survey, facilitating an anonymous and confidential e-mail feedback box, and collecting information from group deliberations. Results The process of strategic planning took place from December 2014 to December 2015. Mission and vision statements were developed, and core values were defined. A final document, Strategic Roadmap to 2020, was established to guide programmatic pursuits during the ensuing 5 years, and an implementation plan was developed to guide the first year of operations. Conclusions The strategic planning process provided an opportunity to mobilize staff talents and identify environmental opportunities, and helped to enable more effective use of resources in a rapidly changing health care environment. The process was valuable in allowing staff to consider and discuss the future, and in identifying strategic issues of the greatest importance to the program. Academic programs with similar mandates might find our report useful in guiding similar processes in their own organizations. PMID:29270061

  14. DOE Hydrogen and Fuel Cells Program Plan (September 2011)

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-09-01

    The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Program and the DOE offices of Nuclear Energy, Fossil Energy, and Science.

  15. FTA multi-year research program plan (FY 2009 - FY 2013).

    Science.gov (United States)

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  16. KLM's boric acid reclamation system (BARS). An update

    International Nuclear Information System (INIS)

    Schuelke, D.; Kniazewycz, B.G.; Markind, J.; Brossart, M.A.; Choi, R.C.

    1987-01-01

    KLM Technologies has implemented its Department of Energy Phase II Small Business Innovative Research (SBIR) demonstration program for a radioactive waste Boric Acid Reclamation System (BARS). Preliminary performance indicates enhanced treatment by the BARS technique over state of the art process methods for selective removal of silica and other impurities from borated water matrices. At optimal system recovery of 96-97 percent. BARS removes nominal levels of boric acid while achieving significant rejection for soluble silica and selective radioisotopes. This is indicative of superior performance compared to existing data governing standard boric acid process treatment in the presence of silica and other contaminants. Conventional technologies have also proven to be relatively expensive, utilizing costly chemically treated disposable resins for primary waste removal. The overall BARS program indicates substantial savings regarding off-site disposal costs based on reduced waste generation. Optimization of the BARS technology could have potential impact on conventional process technologies that are essentially non-selective in removal capacities. Within the scope of the project, a variety of contaminated process stream and mixed radwaste sources have been evaluated at Northern States Power's Prairie Island Nuclear Generating Station. The design of an advanced prototype BARS as an optimized process alternative was the result of KLM's initial Phase 1 SBIR program with the DOE in 1984 and 1985

  17. Integrating human resources and program-planning strategies.

    Science.gov (United States)

    Smith, J E

    1989-06-01

    The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.

  18. Tank waste remediation system program plan

    International Nuclear Information System (INIS)

    Powell, R.W.

    1998-01-01

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization

  19. Tank waste remediation system program plan

    Energy Technology Data Exchange (ETDEWEB)

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  20. Reclamation of oil and gas well sites on privately-owned land in Alberta: An evaluation of benefits and costs

    International Nuclear Information System (INIS)

    Bates, L.A.

    1994-01-01

    In Alberta, ca 24,000 oil/gas well sites will be abandoned over the next 10 years. There is concern that the expense to reclaim the surface lands at these sites to current standards represents a substantial opportunity cost to industry and the provincial economy. The economic costs and benefits associated with regulation of such reclamation activity are examined and the impacts of surface access regulations on the reclamation process are discussed. Cost benefit analysis is not easily applied to environmental regulation where some extra-market benefits and costs are intangible and/or unmeasurable. Although this qualifies the results, it appears that the costs of wellsite reclamation exceed the benefits. Costs are defined as reclamation expenses; benefits are defined as the real estate value of the land, or the net present value of agricultural land rentals. An effort has been made to provide a proxy for the extra-market value of the land to the landowner. The continuation of full surface access compensation for nonproducing wells can result in negative incentive effects that reduce allocative efficiency of reclamation regulation. Reclamation costs are correlated with well age and surface access payments, but not with agricultural land use or geographic region. This suggests that reclamation standards designed to reclaim well sites to the same productive capacity as site-adjacent land is not driving reclamation effort. Rather, landowners have negotiated substantial annual surface lease payments and may also be demanding greater reclamation effort, either to maximize compensation due to higher expectations. Methods of reducing these negative incentive effects to better achieve reclamation goals are suggested. 49 refs., 9 figs., 17 tabs

  1. Study on the cumulative impact of reclamation activities on ecosystem health in coastal waters.

    Science.gov (United States)

    Shen, Chengcheng; Shi, Honghua; Zheng, Wei; Li, Fen; Peng, Shitao; Ding, Dewen

    2016-02-15

    The purpose of this study is to develop feasible tools to investigate the cumulative impact of reclamations on coastal ecosystem health, so that the strategies of ecosystem-based management can be applied in the coastal zone. An indicator system and model were proposed to assess the cumulative impact synthetically. Two coastal water bodies, namely Laizhou Bay (LZB) and Tianjin coastal waters (TCW), in the Bohai Sea of China were studied and compared, each in a different phase of reclamations. Case studies showed that the indicator scores of coastal ecosystem health in LZB and TCW were 0.75 and 0.68 out of 1.0, respectively. It can be concluded that coastal reclamations have a historically cumulative effect on benthic environment, whose degree is larger than that on aquatic environment. The ecosystem-based management of coastal reclamations should emphasize the spatially and industrially intensive layout. Copyright © 2015 Elsevier Ltd. All rights reserved.

  2. 76 FR 49787 - Rural Water Supply Program Approved Appraisal Reports; Availability

    Science.gov (United States)

    2011-08-11

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Rural Water Supply Program Approved Appraisal...: Reclamation provides assistance for appraisal investigations and feasibility studies for rural water supply... the findings and conclusions of the appraisal investigations that identified the water supply problems...

  3. Recycling: Establishing a Citizen-Sponsored Reclamation Center.

    Science.gov (United States)

    Keep America Beautiful, Inc., New York, NY.

    This booklet applies the Clean Community System (CCS) of Keep America Beautiful, Inc. to the development of citizen-sponsored recycling projects. Six initial steps in establishing a reclamation center are given and include information gathering, market analysis, legal requirements, and site location. Suggestions are included for recruiting staff…

  4. Techniques for overcoming community resistance to family planning programs.

    Science.gov (United States)

    Palley, H A

    1968-01-01

    Methods of overcoming resistance to publicly subsidized family planning programs are discussed. The main sources of opposition include groups that oppose family planning for moral reasons, and those who object to the spending of government funds to provide services and information. Such opposition can be weakened by indicating that family planning clinics fulf: 11 important medical needs. Presenting social justification for family planning can help to lower oppostion. In order to secure participation in the programs by low income groups it is essential to have community leaders involved in policy decisions and to use indigenous community paraprofessionals in the clinics. A coalition of representatives of the poor community and the health and welfare system, aided by the community organization, can lead to an effective family planning program.

  5. Planning-Programming-Budgeting Systems.

    Science.gov (United States)

    Tudor, Dean

    Planning Programming and Budgeting Systems (PPBS) have been considered as either synonymous with abstract, advanced, mathematical systems analysis or as an advanced accounting and control system. If PPBS is to perform a useful function, both viewpoints must be combined such that a number of standardized procedures and reports are required and…

  6. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  7. Reclamation of urban areas

    International Nuclear Information System (INIS)

    Roed, J.

    1986-02-01

    A literature study was conducted in order to compare the effectiveness and cost of different reclamation procedures that may be employed after an accident on a nuclear facility takes place in which radioactive material is released to the atmosphere. A substantial amount of work has been done on reclaming soil and snow-covered surfaces. Using scrapers or other soil-moving equipment decontamination factors are 10-100. (The decontamination factor is the ratio of the contamination before to that after the decontamination procedure). However, information on decontamination of paved areas by simple methods such as firehosing and vacuum sweeping are poorly documented. Therefore, only a very uncertain figure in the range 2-10 can be given for the decontamination factor here. It is recommended that a major effort be made in the future to investigate the efficiency of these simple methods, because of their relatively low cost. Also, more expensive methods for reducing the dose such as vacuuming, road planing and deep plowing are treated because of their feasibility under certain circumstances. Using these methods dose reduction factors in the 2-100 range can be obtained. Very expensive techniques, such as sandblasting, water cannon, flame spalling, etc. are justifiable usable only in special situations and are therefore considered very briefly here. The methods vary widely in cost. A simple method like vacuum sweeping costs $0.004 per square meter of surface; whereas one like road planing can reach $4 per square meter. A more sophisticated technique like flame spalling costs as much as $100 per square meter. (author)

  8. Hanford Site Pollution Prevention Plan Progress report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report tracks progress against the goals stated in the Hanford Site 5-year Pollution Prevention Plan. The executive summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, executive summary, and the progress reports are elements of a pollution prevention planning program that is required by Washington Administrative Code (WAC) 173-307 for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement Chapter 70.95C, Revised Code of Washington, an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the inprocess reuse or reclamation of valuable spent material. Although the Hanford Site is exempt, it is voluntarily complying with this state regulatory-mandated program. This is the first year the Hanford Site is submitting a progress report. It covers calendar year 1993 plus the last quarter of 1992. What is reported, in accordance with WAC 173-307, are reductions in hazardous substance use and hazardous waste generated. A system of Process Waste Assessments (PWA) was chosen to meet the requirements of the program. The PWAs were organized by a physical facility or company organization. Each waste-generating facility/organization performed PWAs to identify, screen, and analyze their own reduction options. Each completed PWA identified any number of reduction opportunities, that are listed individually in the plan and summarized by category in the executive summary. These opportunities were to be implemented or evaluated further over the duration of the 5-year plan. The basis of this progress report is to track action taken on these PWA reduction opportunities in relationship to achieving the goals stated in the Pollution Prevention Plan.

  9. Hanford Site Pollution Prevention Plan Progress report, 1993

    International Nuclear Information System (INIS)

    1994-08-01

    This report tracks progress against the goals stated in the Hanford Site 5-year Pollution Prevention Plan. The executive summary of the plan was submitted to the Washington State Department of Ecology (Ecology) in September 1992. The plan, executive summary, and the progress reports are elements of a pollution prevention planning program that is required by Washington Administrative Code (WAC) 173-307 for all hazardous substance users and/or all hazardous waste generators regulated by Ecology. These regulations implement Chapter 70.95C, Revised Code of Washington, an act relating to hazardous waste reduction. The act encourages voluntary efforts to redesign industrial processes to help reduce or eliminate hazardous substances and hazardous waste byproducts, and to maximize the inprocess reuse or reclamation of valuable spent material. Although the Hanford Site is exempt, it is voluntarily complying with this state regulatory-mandated program. This is the first year the Hanford Site is submitting a progress report. It covers calendar year 1993 plus the last quarter of 1992. What is reported, in accordance with WAC 173-307, are reductions in hazardous substance use and hazardous waste generated. A system of Process Waste Assessments (PWA) was chosen to meet the requirements of the program. The PWAs were organized by a physical facility or company organization. Each waste-generating facility/organization performed PWAs to identify, screen, and analyze their own reduction options. Each completed PWA identified any number of reduction opportunities, that are listed individually in the plan and summarized by category in the executive summary. These opportunities were to be implemented or evaluated further over the duration of the 5-year plan. The basis of this progress report is to track action taken on these PWA reduction opportunities in relationship to achieving the goals stated in the Pollution Prevention Plan

  10. Federal Employees Health Benefits Program (FEHBP) Plan Information

    Data.gov (United States)

    Office of Personnel Management — A list of all Federal Employees Health Benefits Program (FEHBP) plans available in each state, as well as links to the plan brochures, changes for each plan from the...

  11. Operations Program Plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1990-09-01

    This document, Revision 4 of the Operations Program Plan, has been developed as the seven-year master plan for operating of the Waste Isolation Pilot Plant (WIPP). Subjects covered include public and technical communications; regulatory and environmental programs; startup engineering; radiation handling, surface operations, and underground operations; waste certification and waste handling; transportation development; geotechnical engineering; experimental operations; engineering program; general maintenance; security program; safety, radiation, and regulatory assurance; quality assurance program; training program; administration activities; management systems program; and decommissioning. 243 refs., 19 figs., 25 tabs. (SM)

  12. ECOLOGY-ECONOMICAL ASSESSMENT OF NEW RECLAMATION METHOD FOR CURRENTLY WORKING TECHNOGENIC MASSIFS

    Directory of Open Access Journals (Sweden)

    Alexey Strizhenok

    2017-01-01

    Full Text Available One of the most relevant problems of the mining industry is the need to reduce the negative impact of technogenic massifs formed by wastes of extraction and processing of mineral raw materials. This problem has a significant meaning for currently used massifs, because traditional ways of reclamation are not suitable for them. The article describes the results of a scientific study on the development of the most efficient reclamation method for currently used technogenic massifs. Described in detail the main results of the field observations, methods and equipment of laboratory experiments conducted to determine agro-chemical properties of the soil and optimal composition of binder agent. The article also provides ecological and economic assessment of the proposed method of reclamation. The study was conducted on the example of the real technogenic massif, formed by wastes of phosphorus ore processing.

  13. DU Processing Efficiency and Reclamation: Plasma Arc Melting

    Energy Technology Data Exchange (ETDEWEB)

    Imhoff, Seth D. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Aikin, Jr., Robert M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Swenson, Hunter [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Solis, Eunice Martinez [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-09-26

    The work described here corresponds to one piece of a larger effort to increase material usage efficiency during DU processing operations. In order to achieve this goal, multiple technologies and approaches are being tested. These technologies occupy a spectrum of technology readiness levels (TRLs). Plasma arc melting (PAM) is one of the technologies being investigated. PAM utilizes a high temperature plasma to melt materials. Depending on process conditions, there are potential opportunities for recycling and material reclamation. When last routinely operational, the LANL research PAM showed extremely promising results for recycling and reclamation of DU and DU alloys. The current TRL is lower due to machine idleness for nearly two decades, which has proved difficult to restart. This report describes the existing results, promising techniques, and the process of bringing this technology back to readiness at LANL.

  14. Land reclamation in Egypt

    DEFF Research Database (Denmark)

    Adriansen, Hanne Kirstine

    2009-01-01

    on fieldwork in a village in the new lands; it is inhabited by graduates who have received land under the Mubarak Project. The analysis shows that they move there in hope of making a better life especially for their children. Nevertheless, the settlers have difficulties building a sense of belonging to the new....... This paper examines from a micro-perspective, the life of Egyptians resettled in the new lands. The first part of the paper provides an introduction to the discourses of land reclamation, to the policies of reclaimed land distribution, and to the background of the settlers. The second part is based...

  15. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  16. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  17. Reclamation of alkaline spent moulding sands of organic and inorganic type and their mixtures

    Directory of Open Access Journals (Sweden)

    R. Dańko

    2011-10-01

    Full Text Available Introduction of modern moulding sands with organic and inorganic binders requires the reclamation treatments in order to be able to reuse the matrices of spent sands. The spent sands, depending on the applied binding agent, are characterised by various abilities of the matrix reclamation. The results of investigations of the reclamation of spent moulding sands with the Rudal binder and spent sands with the Rezolit binder in the system of uniform sands and of mixed ones, are presented in the paper. Investigations were performed by means of the special experimental stands designed and built in the AGH University of Science and Technology, AGH, in Krakow.

  18. Assessing the Sustainable Development of Coastal Reclamation: A Case of Makassar Using GIS Application

    Science.gov (United States)

    Yurnita, A.; Trisutomo, S.; Ali, M.

    2017-07-01

    Reclamation has been made in many areas in Indonesia including Makassar, as a response to the present needs of land as the impact of human activity in urban area. This research aims to assess the sustainable development of coastal reclamation and focus on environmental dimension of sustainable urban development. Assessment will be done by reclamation sustainability index (RSI) and analysis by GIS as the tools. RSI was built from previous research that has simplified from many researches and analysis by Structure of Analytic Hierarchy Process (AHP) and expert choice. RSI uses 9 indices from three indicators of environment factor which are coastal resources, building and infrastructure.

  19. Program plan, and request for reprogramming first year funds

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  20. Mixed Waste Integrated Program Quality Assurance requirements plan

    International Nuclear Information System (INIS)

    1994-01-01

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities

  1. Mixed Waste Integrated Program Quality Assurance requirements plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  2. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  3. Research program plan: steam generators

    International Nuclear Information System (INIS)

    Muscara, J.; Serpan, C.Z. Jr.

    1985-07-01

    This document presents a plan for research in Steam Generators to be performed by the Materials Engineering Branch, MEBR, Division of Engineering Technology, (EDET), Office of Nuclear Regulatory Research. It is one of four plans describing the ongoing research in the corresponding areas of MEBR activity. In order to answer the questions posed, the Steam Generator Program has been organized with the three elements of non-destructive examination; mechanical integrity testing; and corrosion, cleaning and decontamination

  4. Review and summary of Solar Thermal Conversion Program planning assistance

    Energy Technology Data Exchange (ETDEWEB)

    1975-06-01

    The Solar Thermal Conversion Program comprises a major part of the national solar energy program which must be continuously reviewed and modified where necessary. Modifications are typically required to reflect technical achievements and uncertainties which arise from within the program or from other technical programs, changes in budgets available for supporting the program as well as internal program funding priorities, changing goals such as through acceleration or stretch-out of the program schedule, significant organizational changes involving responsible governmental agencies, the introduction of new project management support contractors, and required budget or schedule changes occurring within individual projects that make up the Solar Thermal Conversion Program. The Aerospace Corporation has provided data to assist in planning, review, coordination, and documentation of the overall Solar Thermal Conversion Program. The Solar Thermal Conversion Program Plan is described in detail. Sections 2.0 through 5.0 cover the discussion and detail planning covering the objectives, justification, basic and alternative plans, budgets, and schedules for the Solar Thermal sub-unit portion of the Solar Electric Applications effort. Appendices B1, B2, and B3 include the March 21, March 28, and April 5, 1975, Program Plan submissions of the complete Solar Electric Applications effort. In Appendix B the Solar Thermal, Solar Photovoltaic, Wind Energy, and Ocean Thermal sub-unit texts have been condensed and formatted for integration in the overall ERDA budget package. (WHK)

  5. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  6. Natural and accelerated bioremediation research program plan

    International Nuclear Information System (INIS)

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE's Office of Environmental Management (EM). The program builds on OHER's tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER's and Office of Energy Research's (OER's) commitment to supporting DOE's environmental management mission and the belief that bioremediation is an important part of the solution to DOE's environmental problems

  7. Integrating Robot Task Planning into Off-Line Programming Systems

    DEFF Research Database (Denmark)

    Sun, Hongyan; Kroszynski, Uri

    1988-01-01

    a system architecture for integrated robot task planning. It identifies and describes the components considered necessary for implementation. The focus is on functionality of these elements as well as on the information flow. A pilot implementation of such an integrated system architecture for a robot......The addition of robot task planning in off-line programming systems aims at improving the capability of current state-of-the-art commercially available off-line programming systems, by integrating modeling, task planning, programming and simulation together under one platform. This article proposes...... assembly task is discussed....

  8. Low-level radioactive waste research program plan

    International Nuclear Information System (INIS)

    O'Donnell, E.; Lambert, J.

    1989-11-01

    The Waste Management Branch, Division of Engineering, Office of Nuclear Regulatory Research, has developed a strategy for conducting research on issues of concern to the US Nuclear Regulatory Commission (NRC) in its efforts to ensure safe disposal of low-level radioactive waste (LLW). The resulting LLW research program plan provides an integrated framework for planning the LLW research program to ensure that the program and its products are responsive and timely for use in NRC's LLW regulatory program. The plan discusses technical and scientific issues and uncertainties associated with the disposal of LLW, presents programmatic goals and objectives for resolving them, establishes a long-term strategy for conducting the confirmatory and investigative research needed to meet these goals and objectives, and includes schedules and milestones for completing the research. Areas identified for investigation include waste form and other material concerns, failure mechanisms and radionuclide releases, engineered barrier performance, site characterization and monitoring, and performance assessment. The plan proposes projects that (1) analyze and test actual LLW and solidified LLW under laboratory and field conditions to determine leach rates and radionuclide releases, (2) examine the short- and long-term performance of concrete-enhanced LLW burial structures and high-integrity containers, and (3) attempt to predict water movement and contaminant transport through low permeability saturated media and unsaturated porous media. 4 figs., 3 tabs

  9. Renewable Energy Assessment of Bureau of Reclamation Land and Facilities Using Geographic Information Systems

    Energy Technology Data Exchange (ETDEWEB)

    Heimiller, D.; Haase, S.; Melius, J.

    2013-05-01

    This report summarizes results of geographic information system screening for solar and wind potential at select Bureau of Reclamation lands in the western United States. The study included both utility-scale and facility-scale potential. This study supplements information in the report titled Renewable Energy Assessment for the Bureau of Reclamation: Final Report.

  10. Determination of optimal environmental policy for reclamation of land unearthed in lignite mines - Strategy and tactics

    Science.gov (United States)

    Batzias, Dimitris F.; Pollalis, Yannis A.

    2012-12-01

    In this paper, optimal environmental policy for reclamation of land unearthed in lignite mines is defined as a strategic target. The tactics concerning the achievement of this target, includes estimation of optimal time lag between each lignite site (which is a segment of the whole lignite field) complete exploitation and its reclamation. Subsidizing of reclamation has been determined as a function of this time lag and relevant implementation is presented for parameter values valid for the Greek economy. We proved that the methodology we have developed gives reasonable quantitative results within the norms imposed by legislation. Moreover, the interconnection between strategy and tactics becomes evident, since the former causes the latter by deduction and the latter revises the former by induction in the time course of land reclamation.

  11. FFTF-cycle 10 program and future plan

    Science.gov (United States)

    Kohyama, Akira

    1988-04-01

    Brief outlines are provided of the FFTF cycle 10 program and future plans in consideration. The primary objective of the Japan-US collaboration program is to enable predictions of material behavior in MFRs to be made from data obtained in other irradiation environments. Major program goals are outlined.

  12. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  13. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, M.; Brooks, S.; Miller, J.; Neal, P.; Mason, R.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites by various technical groups. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (concluded 2011 March), in planning the three-year second phase (currently being commenced), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned by a dedicated core team. More and earlier input was solicited from the suppliers than in the planning for the first phase. This was to ensure that the proposed program of work was feasible, and to be able to specify in more detail the resources that would be required to carry it out. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and

  14. 30 CFR 784.24 - Road systems.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Road systems. 784.24 Section 784.24 Mineral... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS... systems. (a) Plans and drawings. Each applicant for an underground coal mining and reclamation permit...

  15. 30 CFR 780.37 - Road systems.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Road systems. 780.37 Section 780.37 Mineral... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.37 Road systems...

  16. Performance Assessment Strategy Plan for the Geologic Repository Program

    International Nuclear Information System (INIS)

    1990-01-01

    Performance assessment is a major constituent of the program being conducted by the US Department of Energy (DOE) to develop a geologic repository. Performance assessment is the set of activities needed for quantitative evaluations to assess compliance with the performance requirements in the regulations for a geologic repository and to support the development of the repository. The strategy for these evaluations has been documented in the Performance Assessment Strategy Plan (DOE, 1989). The implementation of the performance assessment strategy is defined in this document. This paper discusses the scope and objectives of the implementation plan, the relationship of the plan to other program plans, summarizes the performance assessment areas and the integrated strategy of the performance assessment program. 1 fig., 3 tabs

  17. Natural and accelerated bioremediation research program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of the solution to DOE`s environmental problems.

  18. Hydrologic conditions in the coal mining district of Indiana and implications for reclamation of abandoned mine lands

    International Nuclear Information System (INIS)

    Olyphant, G.A.; Harper, D.

    1998-01-01

    Bedrock strata of the mining district of Indiana (Indiana Coal Mining District, ICMD) include numerous coalbeds of economic importance, together with underclays, roof shales, limestones, and sandstones of Pennsylvanian age. These are typically poor aquifers with low hydraulic conductivities and specific yields. Surficial materials include loess, till, alluvium, and other deposits of pleistocene age. The loess and till also have low hydraulic conductivities, so that very few shallow aquifers exist in the vicinities of abandoned mine land (AML) sites, except where they are close to the alluvial fill of large bedrock valleys. The hydrologic cascade at AML sites in Indiana is strongly conditioned by the existence of elevated deposits of coarse-grained coal-preparation refuse and flooded underground mine workings. Flooded mines are the principal conduits of groundwater flow in the area, but their boundaries, flowpaths, and mechanisms of recharge and discharge are very different from those of natural aquifers and are poorly understood. Acidic mine drainage often emerges as seepages and springs on the edges of the elevated refuse deposits, but the low permeability of the natural surficial materials and bedrock inhibits the development of off-site groundwater contaminant plumes. The water balance across the surface of the refuse deposits is critical to reclamation planning and success. Enhancing runoff through reduction of infiltration capacity has the beneficial effect of reducing recharge through the acid-generating refuse, but the excess runoff may be accompanied by soil erosion that can lead to reclamation failure. Furthermore, during cool seasons and stormy periods, a well vegetated surface promotes recharge through increased infiltration, resulting in greater rates of acidic baseflow seepage. Passive Anoxic Limestone Drains (PALDs) have been successfully coupled with wetland treatment systems to improve surface waters that discharge from AML sites. Storm runoff from

  19. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  20. Reclamation status of a degraded pasture based on soil health indicators

    Directory of Open Access Journals (Sweden)

    Cristiane Alcantara dos Santos

    2015-06-01

    Full Text Available Pasture degradation is a concern, especially in susceptible sandy soils for which strategies to recover them must be developed. Microbiological and biochemical soil health indicators are useful in the guindace of soil management practices and sustainable soil use. We assessed the success of threePanicum maximum Jacq. cultivars in the reclamation of a pasture in a sandy Typic Acrudox in the northwest of the state of Paraná, Brazil, based on soil health indicators. On a formerly degraded pasture withUrochloa brizantha (Hochst. ex A. Rich. R.D. Webster, a trial with threeP. maximum (cv. Massai, Tanzânia, or Mombaça was conducted. Lime and phosphate were applied at set-up, and mineral N and K as topdressing. A remnant of degraded pasture adjacent to the trial was used as control. Twenty-three chemical, physical, microbiological and biochemical attributes were assessed for the 0-10 cm topsoil. The procedures for reclamation improved most of the indicators of soil health in relation to the degraded pasture, such as soil P, mineral N, microbial biomass C, ammonification rate, dehydrogenase activity and acid phosphatase. CO2 evolution decreased, whereas microbial biomass C increased in the pasture under reclamation, resulting in a lower metabolic quotient (qCO2 that points to a decrease in metabolic stress of the microbial community. The reclamation of the pasture withP. maximum, especially cv. Mombaça, were evidenced by improvements in the microbiological and biochemical soil health indicators, showing a recovery of processes related to C, N and P cycling in the soil.

  1. High-heat tank safety issue resolution program plan

    International Nuclear Information System (INIS)

    Wang, O.S.

    1993-12-01

    The purpose of this program plan is to provide a guide for selecting corrective actions that will mitigate and/or remediate the high-heat waste tank safety issue for single-shell tank (SST) 241-C-106. This program plan also outlines the logic for selecting approaches and tasks to mitigate and resolve the high-heat safety issue. The identified safety issue for high-heat tank 241-C-106 involves the potential release of nuclear waste to the environment as the result of heat-induced structural damage to the tank's concrete, if forced cooling is interrupted for extended periods. Currently, forced ventilation with added water to promote thermal conductivity and evaporation cooling is used to cool the waste. At this time, the only viable solution identified to resolve this safety issue is the removal of heat generating waste in the tank. This solution is being aggressively pursued as the permanent solution to this safety issue and also to support the present waste retrieval plan. Tank 241-C-106 has been selected as the first SST for retrieval. The program plan has three parts. The first part establishes program objectives and defines safety issues, drivers, and resolution criteria and strategy. The second part evaluates the high-heat safety issue and its mitigation and remediation methods and alternatives according to resolution logic. The third part identifies major tasks and alternatives for mitigation and resolution of the safety issue. Selected tasks and best-estimate schedules are also summarized in the program plan

  2. Developing the strategic plan for pollution prevention in defense programs

    International Nuclear Information System (INIS)

    Marchetti, John A.; Betschart, James F.; Suffern, J. Samuel

    1992-01-01

    In order to provide effective leadership and to ensure a consistent pollution prevention effort in all of its production facilities and laboratories, Defense Programs (DP) Headquarters, in close cooperation with the Field, has developed a strategic plan for its Pollution Prevention Program. The strategic plan is built upon the history of waste minimization, waste reduction, and pollution prevention activity to date, and articulates both long- and short-term strategies to ensure program initiation, growth, and stability. The organization of the program, including Headquarters staffing and linkages to the Geld, is described. Life-cycle analysis of program barriers and bottlenecks, along with associated initiatives and action plans are discussed. (author)

  3. Carbon dynamics, food web structure and reclamation strategies in Athabasca oil sands wetlands (CRFAW)

    International Nuclear Information System (INIS)

    Ciborowski, J.; Dixon, G.; Foote, L.; Liber, K.; Smits, J.

    2010-01-01

    This abstract provided details of the Carbon Dynamics, Food Web Structure and Reclamation Strategies in Athabasca Oil Sands Wetlands (CFRAW) program, a collaboration between oil sands industry partners and university laboratories. CFRAW researchers are investigating the effects of mine tailings and process waters on the development, health, and function of wetland communities in post-mining landscapes. The aim of the program is to accurately predict how quickly the reclaimed wetlands will approach conditions seen in reference wetland systems. The program is also examining the effects of hydrocarbons as a surrogate source of carbon after they are metabolized by bacteria. The biological uptake, pathways, and movement through the food web of materials used by the biota in constructed wetlands are also being studied. Flux estimates will be used to determine if wetlands amended with peat will maintain their productivity. A conceptual model of carbon pathways and budgets is also being developed.

  4. Reclamation of greater than Class C sealed sources at the Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Behrens, R.G.; Jones, S.W.

    1995-01-01

    One of the important overriding themes of the Los Alamos National Laboratory as a world-class scientific institution is to utilize its expertise in enhancing the long-term welfare of society by minimizing negative side effects of nuclear technology over the past five decades. The Los Alamos National Laboratory is therefore committed to the use of its technical competencies and nuclear facilities, developed through programs in the areas of defense and civilian nuclear research, to support activities which will benefit the United States as a whole. As such, this paper discusses the organizational details and requirements of the Neutron Source Reclamation Program at Los Alamos. This program has as its mission the retrieval, interim storage, and chemical reprocessing of 238 PuBe, 239 PuBe and 24l AmBe neutron sources residing in the hands of private companies and industries, academic institutions, and various state and Federal government agencies

  5. Use of morphometric soil aggregates parameters to evaluate the reclamation process in mined areas located at amazon forest - Brazil

    Science.gov (United States)

    Ribeiro, A. I.; Fengler, F. H.; Longo, R. M.; Mello, G. F.; Damame, D. B.; Crowley, D. E.

    2015-12-01

    Brazil has a high mineral potential that have been explored over the years. A large fraction of these mineral resources are located in Amazon region, which is known for its large biodiversity and world climate importance. As the policies that control the Amazon preservation are relatively new, several mining activities have been exploring the Amazon territory, promoting a large process of degradation. Once the mining activities have a high potential of environmental changes the government created polices to restrain the mining in Amazon forests and obligate mining companies to reclaim theirs minded areas. However, the measurement of reclamation development still is a challenging task for the Professionals involved. The volume and complexity of the variables, allied to the difficulty in identifying the reclamation of ecosystem functionalities are still lack to ensure the reclamation success. In this sense this work aims to investigate the representativeness of morphometric soil aggregates parameters in the understanding of reclamation development. The study area is located in the National Forest of Jamari, State of Rondônia. In the past mining companies explored the region producing eight closed mines that are now in reclamation process. The soil aggregates morphometric measurements: geometric mean diameter (GMD), aggregate circularity index, and aggregate roundness, were choose based in its obtaining facility, and their association to biological activity. To achieve the proposed objective the aggregates of eight sites in reclamation, from different closed mines, where chosen and compared to Amazon forest and open mine soil aggregates. The results were analyzed to one way ANOVA to identifying differences between areas in reclamation, natural ecosystem, and open mine. It was obtained differences for GMD and circularity index. However, only the circularity index allowed to identifying differences between the reclamation sites. The results allowed concluding: (1

  6. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  7. 22 CFR 518.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 518.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the...

  8. Costs of abandoned coal mine reclamation and associated recreation benefits in Ohio.

    Science.gov (United States)

    Mishra, Shruti K; Hitzhusen, Frederick J; Sohngen, Brent L; Guldmann, Jean-Michel

    2012-06-15

    Two hundred years of coal mining in Ohio have degraded land and water resources, imposing social costs on its citizens. An interdisciplinary approach employing hydrology, geographic information systems, and a recreation visitation function model, is used to estimate the damages from upstream coal mining to lakes in Ohio. The estimated recreational damages to five of the coal-mining-impacted lakes, using dissolved sulfate as coal-mining-impact indicator, amount to $21 Million per year. Post-reclamation recreational benefits from reducing sulfate concentrations by 6.5% and 15% in the five impacted lakes were estimated to range from $1.89 to $4.92 Million per year, with a net present value ranging from $14.56 Million to $37.79 Million. A benefit costs analysis (BCA) of recreational benefits and coal mine reclamation costs provides some evidence for potential Pareto improvement by investing limited resources in reclamation projects. Copyright © 2012 Elsevier Ltd. All rights reserved.

  9. NASA Land Information System (LIS) Water Availability to Support Reclamation ET Estimation

    Science.gov (United States)

    Toll, David; Arsenault, Kristi; Pinheiro, Ana; Peters-Lidard, Christa; Houser, Paul; Kumar, Sujay; Engman, Ted; Nigro, Joe; Triggs, Jonathan

    2005-01-01

    The U.S. Bureau of Reclamation identified the remote sensing of evapotranspiration (ET) as an important water flux for study and designated a test site in the Lower Colorado River basin. A consortium of groups will work together with the goal to develop more accurate and cost effective techniques using the enhanced spatial and temporal coverage afforded by remote sensing. ET is a critical water loss flux where improved estimation should lead to better management of Reclamation responsibilities. There are several areas where NASA satellite and modeling data may be useful to meet Reclamation's objectives for improved ET estimation. In this paper we outline one possible contribution to use NASA's data integration capability of the Land Information System (LIS) to provide a merger of observational (in situ and satellite) with physical process models to provide estimates of ET and other water availability outputs (e.g., runoff, soil moisture) retrospectively, in near real-time, and also providing short-term predictions.

  10. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  11. Science and technology of rubber reclamation with special attention to NR based waste latex products

    NARCIS (Netherlands)

    Rajan, V.V.; Dierkes, Wilma K.; Joseph, R.; Noordermeer, Jacobus W.M.

    2006-01-01

    A comprehensive overview of reclamation of cured rubber with special emphasis on latex reclamation is depicted in this paper. The latex industry has expanded over the years to meet the world demands for gloves, condoms, latex thread, etc. Due to the strict specifications for the products and the

  12. Highly enriched uranium (HEU) storage and disposition program plan

    International Nuclear Information System (INIS)

    Arms, W.M.; Everitt, D.A.; O'Dell, C.L.

    1995-01-01

    Recent changes in international relations and other changes in national priorities have profoundly affected the management of weapons-usable fissile materials within the United States (US). The nuclear weapon stockpile reductions agreed to by the US and Russia have reduced the national security requirements for these fissile materials. National policies outlined by the US President seek to prevent the accumulation of nuclear weapon stockpiles of plutonium (Pu) and HEU, and to ensure that these materials are subjected to the highest standards of safety, security and international accountability. The purpose of the Highly Enriched Uranium (HEU) Storage and Disposition Program Plan is to define and establish a planned approach for storage of all HEU and disposition of surplus HEU in support of the US Department of Energy (DOE) Fissile Material Disposition Program. Elements Of this Plan, which are specific to HEU storage and disposition, include program requirements, roles and responsibilities, program activities (action plans), milestone schedules, and deliverables

  13. Nanoenhanced Materials for Reclamation of Mine Lands and Other Degraded Soils: A Review

    Directory of Open Access Journals (Sweden)

    Ruiqiang Liu

    2012-01-01

    Full Text Available Successful mine soil reclamation facilitates ecosystem recovery, minimizes adverse environmental impacts, creates additional lands for agricultural or forestry uses, and enhances the carbon (C sequestration. Nanoparticles with extremely high reactivity and deliverability can be applied as amendments to improve soil quality, mitigate soil contaminations, ensure safe land–application of the conventional amendment materials (e.g., manures and biosolids, and enhance soil erosion control. However, there is no report on using nanoenhanced materials for mine soil reclamation. Through reviewing the up-to-date research results on using environment-friendly nanoparticles for agricultural soil quality improvement and for contaminated soil remediation, this paper synthesizes that these nanomaterials with high potentials for mine soil reclamation include zeolites, zero-valent iron nanoparticles, iron oxide nanoparticles, phosphate-based nanoparticles, iron sulfide nanoparticles and C nanotubes. Transport of these particles in the environment and their possible ecotoxicological effects are also discussed. Additionally, this article proposes a practical and economical approach to applying nanotechnology for mine soil reclamation: adding small amounts of nanoparticles to the conventional soil amendment materials and then applying the mixtures for soil quality improvements. Hence the cost of using nanoparticles is reduced and the benefits of both nanoparticles and the conventional amendment materials are harnessed.

  14. 34 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or program as approved during the award process. It may...

  15. 31 CFR 210.9 - Parties to the reclamation.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Parties to the reclamation. 210.9 Section 210.9 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE, DEPARTMENT OF THE TREASURY FINANCIAL MANAGEMENT SERVICE FEDERAL GOVERNMENT PARTICIPATION IN THE...

  16. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R ampersand D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER ampersand WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT ampersand E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs

  17. Experimental program plan for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included.

  18. Experimental program plan for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    1994-01-01

    The US Department of Energy has prepared this Experimental Program Plan for the Waste Isolation Pilot Plant (EPP) to provide a summary of the DOE experimental efforts needed for the performance assessment process for the WIPP, and of the linkages of this process to the appropriate regulations. The Plan encompasses a program of analyses of the performance of the planned repository based on scientific studies, including tests with transuranic waste at laboratory sites, directed at evaluating compliance with the principal regulations governing the WIPP. The Plan begins with background information on the WIPP project, the requirements of the LWA (Land Withdrawal Act), and its objective and scope. It then presents an overview of the regulatory requirements and the compliance approach. Next are comprehensive discussions of plans for compliance with disposal regulations, followed by the SWDA (Solid Waste Disposal Act) and descriptions of activity programs designed to provide information needed for determining compliance. Descriptions and justifications of all currently planned studies designed to support regulatory compliance activities are also included

  19. 76 FR 19067 - Agency Information Collection Extension

    Science.gov (United States)

    2011-04-06

    ... under established marketing plans, Western needs to be able to collect information to evaluate who will... Federal reclamation program.\\2\\ The basic principle of the Reclamation Act of 1902 was that the United... marketing functions of the Department of the Interior to Western.\\8\\ Pursuant to this authority, Western...

  20. Water reclamation and effluent retreatment system at Jaduguda

    Energy Technology Data Exchange (ETDEWEB)

    Beri, K K [Uranium Corporation of India Limited, Jaduguda Mines, Singhbhum (India)

    1994-06-01

    Neutralization of uranium mill tailing with lime provided in original flow sheet was not found adequate for effluent quality control within limits particularly as regards to{sup 226}Ra and Mn. The same was being controlled by dilution and hence no water was being reclaimed. In October 1987 the Jaduguda mill was expanded to augment its ore processing capacity from 1000 MT/day to 1340 MT/day. This necessitated extra water requirement, which could have been met only with water reclamation. But this would have resulted in build up of pollutant ions apart from less water available for dilution. Hence a composite scheme was made for water reclamation and treatment of effluent with BaCl{sub 2} to precipitate Ba(Ra)So{sub 4} and with lime to precipitate Mn as hydroxide. This effluent treatment plant was commissioned in May 1990 and is working satisfactorily. The scheme is being further modified and augmented to take care of Narwa mine water and sewage treatment plant effluent. (author).

  1. Using the Program Sustainability Assessment Tool to Assess and Plan for Sustainability

    Science.gov (United States)

    Mainor, Avia; Moreland-Russell, Sarah; Maier, Ryan C.; Brossart, Laura; Luke, Douglas A.

    2014-01-01

    Implementing and growing a public health program that benefits society takes considerable time and effort. To ensure that positive outcomes are maintained over time, program managers and stakeholders should plan and implement activities to build sustainability capacity within their programs. We describe a 3-part sustainability planning process that programs can follow to build their sustainability capacity. First, program staff and stakeholders take the Program Sustainability Assessment Tool to measure their program’s sustainability across 8 domains. Next, managers and stakeholders use results from the assessment to inform and prioritize sustainability action planning. Lastly, staff members implement the plan and keep track of progress toward their sustainability goals. Through this process, staff can more holistically address the internal and external challenges and pressures associated with sustaining a program. We include a case example of a chronic disease program that completed the Program Sustainability Assessment Tool and engaged in program sustainability planning. PMID:24456644

  2. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  3. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  4. 75 FR 70061 - Dealer Floor Plan Pilot Program Meeting

    Science.gov (United States)

    2010-11-16

    ... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in the Small Business Jobs Act of 2010. The meeting will be open to the public. DATES: The Dealer Floor...

  5. Assessment of post forest fire reclamation in Algarve, Portugal

    Science.gov (United States)

    Andrade, Rita; Panagopoulos, Thomas; Guerrero, Carlos; Martins, Fernando; Zdruli, Pandi; Ladisa, Gaetano

    2014-05-01

    Fire is a common phenomenon in Mediterranean landscapes and it plays a crucial role in its transformations, making the determination of its impact on the ecosystem essential for land management. During summer of 2012, a wildfire took place in Algarve, Portugal, on an area mainly covered by sclerophyllous vegetation (39.44%, 10080ha), broad-leaved forest (20.80%, 5300ha), agriculture land with significant areas of natural vegetation (17.40%, 4400ha) and transitional woodlands-shrubs (16.17%, 4100ha). The objective of the study was to determine fire severity in order to plan post-fire treatments and to aid vegetation recovery and land reclamation. Satellite imagery was used to estimate burn severity by detecting physical and ecological changes in the landscape caused by fire. Differenced Normalized Burn Ratio (DNBR) was used to measure burn severity with pre and post fire data of four Landsat images acquired in October 2011, February and August 2012 and April 2013. The initial and extended differenced normalized burn ratio (DiNBR and DeNBR) were calculated. The calculated burned area of 24291 ha was 552ha lower than the map data determined with field reports. The 19.5% of that area was burned with high severity, 45% with moderate severity and 28.3% with low severity. Comparing fire severity and regrowth with land use, it is shown in DiNBR that the most severely burned areas were predominantly sclerophyllous vegetation (37.6%) and broad-leaved forests (31.1%). From the DeNRB it was found that the reestablishment of vegetation was slower in mixed forests and higher in sclerophyllous vegetation and in land with significant areas of natural vegetation. Faster recovery was calculated for the land uses of sclerophyllous vegetation (46.7%) and significant regrowth in areas of natural vegetation and lands occupied by agriculture (25.4%). Next steps of the study are field validation and crossing with erosion risk maps before to take land reclamation decisions.

  6. SRS ES ampersand H standards compliance program management plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the Department of Energy (DOE), called for three actions: (1) identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; (2) assessment of the adequacy of those standards for protecting public health and safety; and (3) determination of the extent to which they have and are being implemented. This document defines the elements of the SRS program required to support the HQ program in response to DNFSB Recommendation 90-2. The objective is to ensure a consistent approach for all sitewide ES and H Standards Compliance Program efforts that satisfied the intent of Recommendation 90-2 and the HQ 90-2 Implementation Plan in a cost-effective manner. The methodology and instructions for implementation of the SRS program are contained in the Standards Compliance Program Implementation Plan. The Management Plan shall be used in conjunction with the Implementation Plan

  7. Women’s experiences after Planned Parenthood’s exclusion from a family planning program in Texas☆

    Science.gov (United States)

    Woo, C. Junda; Alamgir, Hasanat; Potter, Joseph E.

    2016-01-01

    Objective We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. Study Design We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006–2010 (NSFG). Results (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Conclusions Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Implications Requiring low-income family planning patients to switch healthcare providers has adverse consequences. PMID:26680757

  8. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, Michael E.; Brooks, Sheila M.; Miller, Joan M.; Mason, Robert A.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The liabilities include shutdown research and prototype power reactors, fuel handling facilities, radiochemical laboratories, support buildings, radioactive waste storage facilities, and contaminated lands at several sites located across eastern Canada from Quebec to Manitoba. The largest site, Chalk River Laboratories (CRL) in Ontario, will continue as an operational nuclear site for the foreseeable future. Planning and delivery of the Program is managed by the Liability Management Unit (LMU), a group that was formed within AECL for the purpose. The composition and progress of the NLLP has been reported in recent conferences. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites, and by various technical groups as suppliers to the LMU. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (which will conclude 2011 March), in planning the five-year second phase (which is currently being finalized), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Progress in executing the Program was slower than anticipated due to less than ideal alignment between some planned technical solutions and the actual requirements, as well as the

  9. DOE-owned spent nuclear fuel program plan

    International Nuclear Information System (INIS)

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines

  10. DOE-owned spent nuclear fuel program plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The Department of Energy (DOE) has produced spent nuclear fuel (SNF) for many years as part of its various missions and programs. The historical process for managing this SNF was to reprocess it whereby valuable material such as uranium or plutonium was chemically separated from the wastes. These fuels were not intended for long-term storage. As the need for uranium and plutonium decreased, it became necessary to store the SNF for extended lengths of time. This necessity resulted from a 1992 DOE decision to discontinue reprocessing SNF to recover strategic materials (although limited processing of SNF to meet repository acceptance criteria remains under consideration, no plutonium or uranium extraction for other uses is planned). Both the facilities used for storage, and the fuel itself, began experiencing aging from this extended storage. New efforts are now necessary to assure suitable fuel and facility management until long-term decisions for spent fuel disposition are made and implemented. The Program Plan consists of 14 sections as follows: Sections 2--6 describe objectives, management, the work plan, the work breakdown structure, and the responsibility assignment matrix. Sections 7--9 describe the program summary schedules, site logic diagram, SNF Program resource and support requirements. Sections 10--14 present various supplemental management requirements and quality assurance guidelines.

  11. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  12. ATF Neutron Irradiation Program Technical Plan

    Energy Technology Data Exchange (ETDEWEB)

    Geringer, J. W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division; Katoh, Yutai [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States). Materials Science and Technology Division

    2016-03-01

    The Japan Atomic Energy Agency (JAEA) under the Civil Nuclear Energy Working Group (CNWG) is engaged in a cooperative research effort with the U.S. Department of Energy (DOE) to explore issues related to nuclear energy, including research on accident-tolerant fuels and materials for use in light water reactors. This work develops a draft technical plan for a neutron irradiation program on the candidate accident-tolerant fuel cladding materials and elements using the High Flux Isotope Reactor (HFIR). The research program requires the design of a detailed experiment, development of test vehicles, irradiation of test specimens, possible post-irradiation examination and characterization of irradiated materials and the shipment of irradiated materials to JAEA in Japan. This report discusses the technical plan of the experimental study.

  13. Progress with the reclamation of saline soils in Peru

    International Nuclear Information System (INIS)

    Estrada, J.A.

    1983-01-01

    The present report is the result of five years' experimental work at the Costa Regional Development Institute (IRD-Costa), based in Canete, Lima, Peru, on the reclamation of land affected by salts and hence of seriously limited agricultural value (production lower than 50%). A reclamation method combining surface and at depth washing with artificial drainage of excess water has been tried out and a method of nutrition has been developed which is based on tonification of the seeds before sowing. The results obtained are rather encouraging, so the method looks very promising, especially as it also makes for considerable savings in fertilizers (some 20% less) and for better yields per unit area. Once the ionic behaviour of this method has been studied by means of radioisotopes a large contribution will have been made towards alleviating the problem of saline soils. (author)

  14. Geotechnical and water resource aspects of uranium mill tailings pile reclamation projects

    International Nuclear Information System (INIS)

    Caldwell, J.A.; Tackston, J.W.; Portillo, R.

    1986-01-01

    Design and construction work is currently in progress at more than twenty sites associated with the UMTRA Project - this involves final reclamation of the uranium mill tailings piles so that they are stable for at least 200 years and for up to 1000 years. Remedial action construction plans for the tailings piles involve detailed consideration of the present and possible future ground water and surface-water impacts of the pile. Since the stabilized pile is ultimately a major geotechnical structure, detailed consideration of the long-term resistance to erosion and containment of radioactive material is also required. A case history illustrates how the critical design criteria governing the remedial action activities at the various piles are applied to the pile at the Lakeview site to provide for long-term protection of the water resource and public health and safety

  15. Sense of ownership and evaluation of safety. Questionnaire survey for reclamation project in the uranium mine

    International Nuclear Information System (INIS)

    Ishizaka, Kaoru; Gofuku, Akio; Tanaka, Masaru; Tokizawa, Takayuki; Sato, Kazuhiko; Koga, Osamu

    2010-01-01

    To obtain public understanding on the uranium mining sites reclamation at Ningyo-toge Environmental Engineering Center, it is necessary to conduct appropriate Risk Communication (RC). In this study, to discuss the appropriate Risk communication method on the uranium mining sites reclamation, we conducted questionnaire survey and SEM analysis. The results of the pass analysis are as follows: (1) in the group which has high-sense of ownership, risk acceptance has a strong impact on sense of security for uranium mining sites reclamation, (2) in the group which shows low-sense of ownership, hatred for radioactive ray has a strong impact relatively. (author)

  16. Planning guidance for the Chemical Stockpile Emergency Preparedness Program

    Energy Technology Data Exchange (ETDEWEB)

    Shumpert, B.L.; Watson, A.P.; Sorensen, J.H. [and others

    1995-02-01

    This planning guide was developed under the direction of the U.S. Army and the Federal Emergency Management Agency (FEMA) which jointly coordinate and direct the development of the Chemical Stockpile Emergency Preparedness Program (CSEPP). It was produced to assist state, local, and Army installation planners in formulating and coordinating plans for chemical events that may occur at the chemical agent stockpile storage locations in the continental United States. This document provides broad planning guidance for use by both on-post and off-post agencies and organizations in the development of a coordinated plan for responding to chemical events. It contains checklists to assist in assuring that all important aspects are included in the plans and procedures developed at each Chemical Stockpile Disposal Program (CSDP) location. The checklists are supplemented by planning guidelines in the appendices which provide more detailed guidance regarding some issues. The planning guidance contained in this document will help ensure that adequate coordination between on-post and off-post planners occurs during the planning process. This planning guide broadly describes an adequate emergency planning base that assures that critical planning decisions will be made consistently at every chemical agent stockpile location. This planning guide includes material drawn from other documents developed by the FEMA, the Army, and other federal agencies with emergency preparedness program responsibilities. Some of this material has been developed specifically to meet the unique requirements of the CSEPP. In addition to this guidance, other location-specific documents, technical studies, and support studies should be used as needed to assist in the planning at each of the chemical agent stockpile locations to address the specific hazards and conditions at each location.

  17. INSPECT: a package of computer programs for planning safeguards inspections

    International Nuclear Information System (INIS)

    Wincek, M.A.; Mullen, M.F.

    1979-04-01

    As part of the U.S. program to provide technical assistance to the International Atomic Energy Agency, a package of computer programs was developed for use in planning safeguards inspections of various types of nuclear facilities. The INSPECT software package is a set of five interactive FORTRAN programs which can be used to calculate the variance components of the MUF (Material Unaccounted For) statistic, the variance components of the D (difference) statistic, attribute and variables sampling plans, a measure of the effectiveness of the inspection, and a measurement of the cost of implementing the inspection plan. This report describes the programs and explains how to use them

  18. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  19. A new low-cost method of reclaiming mixed foundry waste sand based on wet-thermal composite reclamation

    OpenAIRE

    Fan Zitian; Liu Fuchu; Long Wei

    2014-01-01

    A lot of mixed clay-resin waste sand from large-scale iron foundries is discharged every day; so mixed waste sand reclamation in low cost and high quality has a great realistic significance. In the study to investigate the possibility of reusing two types of waste foundry sands, resin bonded sand and clay bonded sand which came from a Chinese casting factory, a new low-cost reclamation method of the mixed foundry waste sand based on the wet-thermal composite reclamation was proposed. The wast...

  20. Coupled hydrodynamic and ecological simulation for prognosticating land reclamation impacts in river estuaries

    Science.gov (United States)

    Xu, Yan; Cai, Yanpeng; Sun, Tao; Yang, Zhifeng; Hao, Yan

    2018-03-01

    A multiphase finite-element hydrodynamic model and a phytoplankton simulation approach are coupled into a general modeling framework. It can help quantify impacts of land reclamation. Compared with previous studies, it has the following improvements: a) reflection of physical currents and suitable growth areas for phytoplankton, (b) advancement of a simulation method to describe the suitability of phytoplankton in the sea water. As the results, water velocity is 16.7% higher than that of original state without human disturbances. The related filling engineering has shortened sediment settling paths, weakened the vortex flow and reduced the capacity of material exchange. Additionally, coastal reclamation lead to decrease of the growth suitability index (GSI), thus it cut down the stability of phytoplankton species approximately 4-12%. The proposed GSI can be applied to the management of coastal reclamation for minimizing ecological impacts. It will be helpful for facilitating identifying suitable phytoplankton growth areas.

  1. NASA program planning on nuclear electric propulsion

    International Nuclear Information System (INIS)

    Bennett, G.L.; Miller, T.J.

    1992-03-01

    As part of the focused technology planning for future NASA space science and exploration missions, NASA has initiated a focused technology program to develop the technologies for nuclear electric propulsion and nuclear thermal propulsion. Beginning in 1990, NASA began a series of interagency planning workshops and meetings to identify key technologies and program priorities for nuclear propulsion. The high-priority, near-term technologies that must be developed to make NEP operational for space exploration include scaling thrusters to higher power, developing high-temperature power processing units, and developing high power, low-mass, long-lived nuclear reactors. 28 refs

  2. US Department of Energy Integrated Resource Planning Program: Accomplishments and opportunities

    Energy Technology Data Exchange (ETDEWEB)

    White, D.L. [Oak Ridge National Lab., TN (United States); Mihlmester, P.E. [Aspen Systems Corp., Oak Ridge, TN (United States)

    1993-12-17

    The US Department of Energy Integrated Resource Planning Program supports many activities and projects that enhance the process by which utilities assess demand and supply options and, subsequently, evaluate and select resources. The US Department of Energy program coordinates integrated resource planning in risk and regulatory analysis; utility and regional planning; evaluation and verification; information transfer/technological assistance; and demand-side management. Professional staff from the National Renewable Energy Laboratory, Oak Ridge National Laboratory, Lawrence Berkeley Laboratory, and Pacific Northwest Laboratories collaborate with peers and stakeholders, in particular, the National Association of Regulatory Utility Commissioners, and conduct research and activities for the US Department of Energy. Twelve integrated resource planning activities and projects are summarized in this report. The summaries reflect the diversity of planning and research activities supported by the Department. The summaries also reflect the high levels of collaboration and teaming that are required by the Program and practiced by the researchers. It is concluded that the Program is achieving its objectives by encouraging innovation and improving planning and decision making. Furthermore, as the Department continues to implement planned improvements in the Program, the Department is effectively positioned to attain its ambitious goals.

  3. Developing an interdisciplinary certificate program in transportation planning.

    Science.gov (United States)

    2010-09-01

    This project develops and implements a graduate certificate in transportation planning. Texas A&M : University (A&M) currently offers instruction in transportation through its Master of Urban Planning (MUP) : and Civil Engineering (CE) programs; howe...

  4. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Science.gov (United States)

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  5. Quarterly report on program cost and schedule: Fourth quarter FY 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Major program milestones completed in the fourth quarter of FY 1988 include completed preliminary draft NWPAA Section 175 Impacts Report, completed Title I ESF design, completed site reclamation in Texas, distributed review draft of the Dry Cask Storage Study, completed draft and final FY 1990 OMB budget, issued FY 1987 Annual Report to Congress, issued four draft Environmental Field Activity Plans, issued draft Environmental Program Overview, and made grant payments to local governments under Section 116 of NWPA, as amended. Major accomplishments during the fourth quarter of FY 1988 are listed. The Water Appropriation Permit Application was filed with the Nevada State Engineer on July 21, 1988. Installation and checkout of the Prototype Engineered Barrier Test equipment in G-tunnel is continuing with an expected early September test initiation data. The Configuration Management Plan was sent to DOE/HQ for approval. The prototype facility for testing the horizontal waste package emplacement configuration was completed in the G-tunnel

  6. Task plan for the US Department of Energy TMI-2 programs

    International Nuclear Information System (INIS)

    1982-10-01

    The Task Plan for the US Department of Energy (DOE) Three Mile Island (TMI) Unit 2 Programs identifies the tasks to be planned and administered by the DOE Technical Integration Office (TIO) in a manner which will maximize the use of available resources, obtain the maximum benefit from the opportunities associated with the TMI-2 cleanup effort, and retrieve generically useful information for addressing some of the key problems and issues facing the nuclear power industry. The Plan identifies tasks in three major program areas where DOE has assumed implementation responsibility. The DOE TMI-2 Programs are: Data Acquisition Program, Waste Immobilization Program, and Reactor Evaluation Program. The plan is intended to serve as a management overview by defining the task objective, benefits, and work scope with respect to prioritization of tasks and utilization of resources

  7. Environmental restoration and waste management: Robotics technology development program: Robotics 5-year program plan

    International Nuclear Information System (INIS)

    1991-01-01

    This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R ampersand D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER ampersand WM) operations at DOE sites to be safer, faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER ampersand WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER ampersand WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER ampersand WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs

  8. Impact of direct greenhouse gas emissions on the carbon footprint of water reclamation processes employing nitrification-denitrification.

    Science.gov (United States)

    Schneider, Andrew G; Townsend-Small, Amy; Rosso, Diego

    2015-02-01

    Water reclamation has the potential to reduce water supply demands from aquifers and more energy-intensive water production methods (e.g., seawater desalination). However, water reclamation via biological nitrification-denitrification is also associated with the direct emission of the greenhouse gases (GHGs) CO₂, N₂O, and CH₄. We quantified these direct emissions from the nitrification-denitrification reactors of a water reclamation plant in Southern California, and measured the (14)C content of the CO₂ to distinguish between short- and long-lived carbon. The total emissions were 1.5 (±0.2) g-fossil CO₂ m(-3) of wastewater treated, 0.5 (±0.1) g-CO₂-eq of CH₄ m(-3), and 1.8 (±0.5) g-CO₂-eq of N₂O m(-3), for a total of 3.9 (±0.5) g-CO₂-eqm(-3). This demonstrated that water reclamation can be a source of GHGs from long lived carbon, and thus a candidate for GHG reduction credit. From the (14)C measurements, we found that between 11.4% and 15.1% of the CO₂ directly emitted was derived from fossil sources, which challenges past assumptions that the direct CO₂ emissions from water reclamation contain only modern carbon. A comparison of our direct emission measurements with estimates of indirect emissions from several water production methods, however, showed that the direct emissions from water reclamation constitute only a small fraction of the plant's total GHG footprint. Copyright © 2014 Elsevier B.V. All rights reserved.

  9. Reclamation of abandoned mined lands along th Upper Illinois Waterway using dredged material

    Energy Technology Data Exchange (ETDEWEB)

    Van Luik, A; Harrison, W

    1982-01-01

    Sediments were sampled and characterized from 28 actual or proposed maintenance-dredging locations in the Upper Illinois Waterway, that is, the Calumet-Sag Channel, the Des Plaines River downstream of its confluence with the Calumet-Sag Channel, and the Illinois River from the confluence of the Kankakee and Des Plaines rivers to Havana, Illinois. Sufficient data on chemical constituents and physical sediments were obtained to allow the classification of these sediments by currently applicable criteria of the Illinois Environmental Protection Agency for the identification of hazardous, persistent, and potentially hazardous wastes. By these criteria, the potential dredged materials studied were not hazardous, persistent, or potentially hazardous; they are a suitable topsoil/ reclamation medium. A study of problem abandoned surface-mined land sites (problem lands are defined as being acidic and/or sparsely vegetated) along the Illinois River showed that three sites were particularly well suited to the needs of the Corps of Engineers (COE) for a dredged material disposal/reclamation site. Thes sites were a pair of municipally owned sites in Morris, Illinois, and a small corporately owned site east of Ottawa, Illinois, and adjacent to the Illinois River. Other sites were also ranked as to suitability for COE involvement in their reclamation. Reclamation disposal was found to be an economically competitive alternative to near-source confined disposal for Upper Illinois Waterway dredged material.

  10. Tank waste remediation system environmental program plan

    International Nuclear Information System (INIS)

    Borneman, L.E.

    1998-01-01

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996)

  11. Tank waste remediation system environmental program plan

    Energy Technology Data Exchange (ETDEWEB)

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  12. 77 FR 25868 - Iowa Regulatory Program

    Science.gov (United States)

    2012-05-02

    ... reference of applicable portions of 30 CFR part 700 to End from the July 1, 2002, version to the July 1, 2010, version. Additionally, Iowa proposed to revise its Program related to ownership and control by... the Iowa regulatory program (Iowa program) under the Surface Mining Control and Reclamation Act of...

  13. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    International Nuclear Information System (INIS)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan

  14. Radioactive Waste Management Research Program Plan for high-level waste: 1987

    International Nuclear Information System (INIS)

    1987-05-01

    This plan will identify and resolve technical and scientific issues involved in the NRC's licensing and regulation of disposal systems intended to isolate high level hazardous radioactive wastes (HLW) from the human environment. The plan describes the program goals, discusses the research approach to be used, lays out peer review procedures, discusses the history and development of the high level radioactive waste problem and the research effort to date and describes study objectives and research programs in the areas of materials and engineering, hydrology and geochemistry, and compliance assessment and modeling. The plan also details the cooperative interactions with international waste management research programs. Proposed Earth Science Seismotectonic Research Program plan for radioactive waste facilities is appended

  15. 40 CFR 30.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... FEDERAL ASSISTANCE UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 30.25 Revision of budget and program plans. (a) The budget plan is the financial...

  16. 45 CFR 74.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATIVE REQUIREMENTS FOR AWARDS AND SUBAWARDS TO INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NONPROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  17. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  18. Tank Waste Remediation System Inactive Miscellaneous Underground Storage Tanks Program Plan

    International Nuclear Information System (INIS)

    Gustavson, R.D.

    1995-12-01

    The Program Management Plan (PMP) describes the approach that will be used to manage the Tank Waste Remediation System (TWRS) Inactive Miscellaneous Underground Storage Tank (IMUST) Program. The plan describes management, technical, and administrative control systems that will be used to plan and control the IMUSTs Program performance. The technical data to determine the IMUSTs status for inclusion in the Single Shell Tank Farm Controlled Clean and Stable (CCS) Program. The second is to identify and implement surveillance, characterization, stabilization, and modifications to support CCS prior to final closure

  19. A review on salt lake city, Kolkata, India: Master planning and realization

    Directory of Open Access Journals (Sweden)

    Tošković Dobrivoje

    2008-01-01

    Full Text Available Motivation for construction of Salt Lake City comes from the circumstances characterizing life in Calcutta known by its social, political and cultural activities. Among many problems, the City was faced with poverty and overcrowding. West Bengal Government realized that serious steps have to be taken to resolve the situation. One of the biggest actions of the Government was creation of so called 'NEDECO' Plan for reclamation certain area of the Salted Lakes, followed by the tender for urban planning. The enterprise for water ways Ivan Milutinović was considered the most convenient for both: reclamation and planning. The Conceptualization covers the Main Aims and interests forming plan basis where three factors were selected: urban character, new vs old town, inhabitants and town growth. Follows Existing Land Use Pattern of the Municipal Area. The realization of the Salt Lake Master Plan, as a part of the Municipal Area, is shown through an Overview of Achieved Infrastructure covering Roads, Water Supply, Sewerage, Area Level Storm Water Drainage, Solid Waste Management and, finally, through the Other Municipal Services, such as: Administrative Infrastructure, Health Infrastructure, Greeneries, Water bodies, Socio-Cultural Infrastructure. .

  20. Response of soil physicochemical properties and enzyme activities to long-term reclamation of coastal saline soil, Eastern China.

    Science.gov (United States)

    Xie, Xuefeng; Pu, Lijie; Wang, Qiqi; Zhu, Ming; Xu, Yan; Zhang, Meng

    2017-12-31

    Soil enzyme activity during different years of reclamation and land use patterns could indicate changes in soil quality. The objective of this research is to explore the dynamics of 5 soil enzyme activities (dehydrogenase, amylase, urease, acid phosphatase and alkaline phosphatase) involved in C, N, and P cycling and their responses to changes in soil physicochemical properties resulting from long-term reclamation of coastal saline soil. Soil samples from a total of 55 sites were collected from a coastal reclamation area with different years of reclamation (0, 7, 32, 40, 63a) in this study. The results showed that both long-term reclamation and land use patterns have significant effects on soil physicochemical properties and enzyme activities. Compared with the bare flat, soil water content, soil bulk density, pH and electrical conductivity showed a decreasing trend after reclamation, whereas soil organic carbon, total nitrogen and total phosphorus tended to increase. Dehydrogenase, amylase and acid phosphatase activities initially increased and then decreased with increasing years of reclamation, whereas urease and alkaline phosphatase activities were characterized by an increase-decrease-increase trend. Moreover, urease, acid phosphatase and alkaline phosphatase activities exhibited significant differences between coastal saline soil with 63years of reclamation and bare flat, whereas dehydrogenase and amylase activities remained unchanged. Aquaculture ponds showed higher soil water content, pH and EC but lower soil organic carbon, total nitrogen and total phosphorus than rapeseed, broad bean and wheat fields. Rapeseed, broad bean and wheat fields displayed higher urease and alkaline phosphatase activities and lower dehydrogenase, amylase and acid phosphatase activities compared with aquaculture ponds. Redundancy analysis revealed that the soil physicochemical properties explained 74.5% of the variation in soil enzyme activities and that an obvious relationship

  1. Potential exposure and treatment efficiency of nanoparticles in water supplies based on wastewater reclamation

    DEFF Research Database (Denmark)

    Kirkegaard, Peter; Hansen, Steffen Foss; Rygaard, Martin

    2015-01-01

    Water scarcity brings an increased focus on wastewater reclamation for drinking water supply. Meanwhile, the production volume of nanoparticles (NPs) is rapidly increasing, but to date there has been little attention given to the fate of NPs in water systems based on wastewater reclamation. We have...... investigated the possible concentrations of silver (Ag), titanium dioxide (TiO2), and zinc oxide (ZnO) nanoparticles in tap water for water supplies based on reclaimed wastewater. Tap water concentrations of the NPs were assessed by mass flow analyses of two typical wastewater reclamation concepts: 1) advanced...... studies are available on the removal efficiencies of NPs by advanced water treatment processes with a majority of the identified studies focusing on removal efficiencies in wastewater treatment plants and fate in surface waters. The NP removal efficiency of several treatment processes is unknown...

  2. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  3. Indian Creek-AML: Coal slurry reclamation (Kansas case history)

    International Nuclear Information System (INIS)

    Witthar, S.R.

    1998-01-01

    Black and Veatch, assisted by Jack Nawrot, developed conceptual and final designs and provided construction assistance to create grasslands and wetlands in order to reclaim an abandoned coal mine for the state of Kansas. The mine included spoils, a coal refuse dump, and slurry pond in the Indian Creek drainage basin in east central Kansas. The Indian Creek flowed from an off-site abandoned mine and through the coal slurry pond where its waters became more polluted. The intent of the reclamation project was to improve water quality and create a wildlife refuge. The coal refuse was covered and seeded with a diversity of vegetation including several grasses and legume. The slurry pond was developed into a series of large wetland cells to improve water quality. Prior to reclamation, the water leaving the site had a typical pH of 3.3, ranging from 2.4 to 5.6, an iron content which typically over 22 mg/L and ranging over 100 mg/L, and contained large amounts of coal slurry. The acid sediment in the slurry killed fish and caused visible damage to a new large concrete box culvert several miles downstream of the site. Post-reclamation water quality leaving the Indian Creek site showed immediate improvement even before vegetation was reestablished. The existing wetland treatment systems have been successfully treating water for over seven years with the pH of the water leaving the wetlands above 7 and soluble iron content less than 1 mg/L. Fish in the constructed wetlands support waterfowl which now nest onsite

  4. 20 CFR 435.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT ORGANIZATIONS, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 435.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  5. 38 CFR 49.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 49.25 Revision of budget and program plans. (a) The budget plan is the financial expression of...

  6. 45 CFR 2543.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-10-01

    ... AND COMMUNITY SERVICE GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 2543.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  7. Nuclear Regulatory Commission Human Factors Program Plan. Revision 2

    International Nuclear Information System (INIS)

    1986-04-01

    This document is the Second Annual Revision to the NRC Human Factors Program Plan. The first edition was published in August 1983. Revision 1 was published in July of 1984. Purpose of the NRC Human Factors Program is to ensure that proper consideration is given to human factors in the design and operation of nuclear power plants. This document describes the plans of the Office of Nuclear Reactor Regulation to address high priority human factors concerns of importance to reactor safety in FY 1986 and FY 1987. Revision 2 of the plan incorporates recent Commission decisions and policies bearing on the human factors aspects of reactor safety regulation. With a few exceptions, the principal changes from prior editions reflect a shift from developing new requirements to staff evaluation of industry progress in resolving human factors issues. The plan addresses seven major program elements: (1) Training, (2) Licensing Examinations, (3) Procedures, (4) Man-Machine Interface, (5) Staffing and Qualifications, (6) Management and Organization, and (7) Human Performance

  8. Building Technologies Program Multi-Year Program Plan Technology Validation and Market Introduction 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2008-01-01

    Building Technologies Program Multi-Year Program Plan 2008 for technology validation and market introduction, including ENERGY STAR, building energy codes, technology transfer application centers, commercial lighting initiative, EnergySmart Schools, EnergySmar

  9. The legal framework for wellsite abandonment and reclamation in Alberta

    International Nuclear Information System (INIS)

    Gilmour, B.S.

    1997-01-01

    The legislative framework for wellsite reclamation in Alberta was discussed. The legal requirements that impact on wellsite abandonment and reclamation, with emphasis on the Oil and Gas Conservation Act (OGCA) and the Environmental Protection and Enhancement Act (EPEA) were described. In 1994, the Orphan Well fund was established to ensure that wells are properly abandoned in those cases where participants are insolvent. The fund is financed by the petroleum industry. The regulatory requirements for wellsite abandonment are found in the OGCA and the Well Abandonment Guide 20 which provides explicit procedures for both open-hole and cased-hole abandonment. Liability for contaminated sites exists under the contaminated sites provision of the EPEA. Amendments to the OGCA provide for more supervision over licence transfers and the granting of licences to first-time licensees

  10. Succession of Bacterial Community Structure and Diversity in Soil along a Chronosequence of Reclamation and Re-Vegetation on Coal Mine Spoils in China

    Science.gov (United States)

    Li, Yuanyuan; Wen, Hongyu; Chen, Longqian; Yin, Tingting

    2014-01-01

    The growing concern about the effectiveness of reclamation strategies has motivated the evaluation of soil properties following reclamation. Recovery of belowground microbial community is important for reclamation success, however, the response of soil bacterial communities to reclamation has not been well understood. In this study, PCR-based 454 pyrosequencing was applied to compare bacterial communities in undisturbed soils with those in reclaimed soils using chronosequences ranging in time following reclamation from 1 to 20 year. Bacteria from the Proteobacteria, Chloroflexi, Actinobacteria, Acidobacteria, Planctomycetes and Bacteroidetes were abundant in all soils, while the composition of predominant phyla differed greatly across all sites. Long-term reclamation strongly affected microbial community structure and diversity. Initial effects of reclamation resulted in significant declines in bacterial diversity indices in younger reclaimed sites (1, 8-year-old) compared to the undisturbed site. However, bacterial diversity indices tended to be higher in older reclaimed sites (15, 20-year-old) as recovery time increased, and were more similar to predisturbance levels nearly 20 years after reclamation. Bacterial communities are highly responsive to soil physicochemical properties (pH, soil organic matter, Total N and P), in terms of both their diversity and community composition. Our results suggest that the response of soil microorganisms to reclamation is likely governed by soil characteristics and, indirectly, by the effects of vegetation restoration. Mixture sowing of gramineae and leguminosae herbage largely promoted soil geochemical conditions and bacterial diversity that recovered to those of undisturbed soil, representing an adequate solution for soil remediation and sustainable utilization for agriculture. These results confirm the positive impacts of reclamation and vegetation restoration on soil microbial diversity and suggest that the most important

  11. NWTS waste package program plan. Volume II. Program logic networks

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  12. Description of concept and first feasibility test results of a life support subsystem of the Botany Facility based on water reclamation

    Science.gov (United States)

    Loeser, H. R.

    1986-01-01

    The Botany Facility allows the growth of higher plants and fungi over a period of 6 months maximum. It is a payload planned for the second flight of the Eureca platform around 1990. Major tasks of the Life Support Subsystem (LSS) of the Botany Facility include the control of the pressure and composition of the atmosphere within the plant/fungi growth chambers, control of the temperature and humidity of the air and the regulation of the soil water content within specified limits. Previous studies have shown that various LSS concepts are feasible ranging from heavy, simple and cheap to light, complex and expensive solutions. A summary of those concepts is given. A new approach to accomplish control of the temperature and humidity of the air within the growth chambers based on water reclamation is discussed. This reclamation is achieved by condensation with a heat pump and capillary transport of the condensate back into the soil of the individual growth chamber. Some analytical estimates are given in order to obtain guidelines for circulation flow rates and to determine the specific power consumption.

  13. Nuclear electric propulsion for planetary science missions: NASA technology program planning

    International Nuclear Information System (INIS)

    Doherty, M.P.

    1993-05-01

    This paper presents the status of technology program planning to develop those Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies with significant development heritage: ion electric propulsion and the SP-100 space nuclear power technologies. Detailed plans are presented for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities

  14. The importance of pre-planning for large hydrostatic test programs

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Andrew Keith [WorleyParsons Calgary, Calgary, AB (Canada); Wong, Everett Clementi [Enbridge Pipelines Inc., Edmonton, AB (Canada)

    2010-07-01

    During the design phase of a pipeline project, large hydrostatic test programs are required to locate and secure water sources. Many companies complete hydrostatic test planning through high level desktop analysis, however this technique can result in important unplanned costs and schedule delays. The aim of this paper is to assess the cost benefits of pre-planning large hydrostatic test programs versus the costs of unplanned delays in the execution of hydrostatic testing. This comparison was based on the successful application of pre-planning of 57 mainline hydrostatic tests in the construction of the Line 4 Extension and Alberta Clipper Expansion oil pipelines by Enbridge Pipelines Inc. Results showed that costs of delays and uncertainty during construction far outweigh the costs of pre-planning. This study highlighted that pre-planning for large hydrostatic test programs should be carried out in the execution of large pipeline projects to ensure success.

  15. 22 CFR 145.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-04-01

    ... Section 145.25 Foreign Relations DEPARTMENT OF STATE CIVIL RIGHTS GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 145.25 Revision of budget and program plans. (a) The budget plan is the...

  16. 28 CFR 70.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-07-01

    ... REQUIREMENTS FOR GRANTS AND AGREEMENTS (INCLUDING SUBAWARDS) WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Financial and Program Management § 70.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  17. 15 CFR 14.25 - Revision of budget and program plans.

    Science.gov (United States)

    2010-01-01

    ... ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, OTHER NON-PROFIT, AND COMMERCIAL ORGANIZATIONS Post-Award Requirements Financial and Program Management § 14.25 Revision of budget and program plans. (a) The budget plan is the financial expression of the project or...

  18. Selenide isotope generator for the Galileo mission. Reliability program plan

    International Nuclear Information System (INIS)

    1978-10-01

    The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineated herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work

  19. Review of Current Aircrew Coordination Training Program and Master Plan for Program Enhancement: Aircrew Coordination Training Master Plan

    National Research Council Canada - National Science Library

    Grubb, G

    2001-01-01

    ...) program to develop a master plan of continuous improvement. Research source materials included policies, training courseware, evaluation guides, research papers and reports, and assessment summaries of operational trend data...

  20. Savannah River Waste Management Program Plan - FY 1982

    International Nuclear Information System (INIS)

    1981-12-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1982. In addition, the document projects activities for several years beyond 1982 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of October 1, 1981

  1. Westinghouse Hanford Company waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Craig, P.A.; Nichols, D.H.; Lindsey, D.W.

    1991-08-01

    The purpose of this plan is to establish the Westinghouse Hanford Company's Waste Minimization Program. The plan specifies activities and methods that will be employed to reduce the quantity and toxicity of waste generated at Westinghouse Hanford Company (Westinghouse Hanford). It is designed to satisfy the US Department of Energy (DOE) and other legal requirements that are discussed in Subsection C of the section. The Pollution Prevention Awareness Program is included with the Waste Minimization Program as permitted by DOE Order 5400.1 (DOE 1988a). This plan is based on the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, which directs DOE Field Office, Richland contractors to develop and maintain a waste minimization program. This waste minimization program is an organized, comprehensive, and continual effort to systematically reduce waste generation. The Westinghouse Hanford Waste Minimization Program is designed to prevent or minimize pollutant releases to all environmental media from all aspects of Westinghouse Hanford operations and offers increased protection of public health and the environment. 14 refs., 2 figs., 1 tab

  2. 30 CFR 906.16 - Required program amendments.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Required program amendments. 906.16 Section 906.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO § 906.16 Required program...

  3. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  4. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  5. MHD program plan, FY 1991

    Science.gov (United States)

    1990-10-01

    The current magnetohydrodynamic MHD program being implemented is a result of a consensus established in public meetings held by the Department of Energy in 1984. The public meetings were followed by the formulation of a June 1984 Coal-Fired MHD Preliminary Transition and Program Plan. This plan focused on demonstrating the proof-of-concept (POC) of coal-fired MHD electric power plants by the early 1990s. MHD test data indicate that while there are no fundamental technical barriers impeding the development of MHD power plants, technical risk remains. To reduce the technical risk three key subsystems (topping cycle, bottoming cycle, and seed regeneration) are being assembled and tested separately. The program does not require fabrication of a complete superconducting magnet, but rather the development and testing of superconductor cables. The topping cycle system test objectives can be achieved using a conventional iron core magnet system already in place at a DOE facility. Systems engineering-derived requirements and analytical modeling to support scale-up and component design guide the program. In response to environmental, economic, engineering, and utility acceptance requirements, design choices and operating modes are tested and refined to provide technical specifications for meeting commercial criteria. These engineering activities are supported by comprehensive and continuing systems analyses to establish realistic technical requirements and cost data. Essential elements of the current program are to: develop technical and environmental data for the integrated MHD topping cycle and bottoming cycle systems through POC testing (1000 and 4000 hours, respectively); design, construct, and operate a POC seed regeneration system capable of processing spent seed materials from the MHD bottoming cycle; prepare conceptual designs for a site specific MHD retrofit plant; and continue supporting research necessary for system testing.

  6. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  7. SNL/CA Environmental Planning and Ecology Annual Program Report for Calendar Year 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Barbara L.

    2005-05-01

    The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.

  8. A Seven-Step Business Plan Methodology To Develop and Manage Certificate Programs.

    Science.gov (United States)

    Cherif, Karim

    2000-01-01

    Outlines a process for writing a business plan for university certificate programs. The plan's sections include executive summary, rationale and objectives, prospective student profile, external involvement, program characteristics, marketing and promotion, and program administration. (SK)

  9. High-temperature gas-cooled reactor safety-reliability program plan

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The purpose of this document is to present a safety plan as part of an overall program plan for the design and development of the High Temperature Gas-Cooled Reactor (HTGR). This plan is intended to establish a logical framework for identifying the technology necessary to demonstrate that the requisite degree of public risk safety can be achieved economically. This plan provides a coherent system safety approach together with goals and success criterion as part of a unifying strategy for licensing a lead reactor plant in the near term. It is intended to provide guidance to program participants involved in producing a technology base for the HTGR that is fully responsive to safety consideration in the design, evaluation, licensing, public acceptance, and economic optimization of reactor systems.

  10. Impact of direct greenhouse gas emissions on the carbon footprint of water reclamation processes employing nitrification–denitrification

    International Nuclear Information System (INIS)

    Schneider, Andrew G.; Townsend-Small, Amy; Rosso, Diego

    2015-01-01

    Water reclamation has the potential to reduce water supply demands from aquifers and more energy-intensive water production methods (e.g., seawater desalination). However, water reclamation via biological nitrification–denitrification is also associated with the direct emission of the greenhouse gases (GHGs) CO 2 , N 2 O, and CH 4 . We quantified these direct emissions from the nitrification–denitrification reactors of a water reclamation plant in Southern California, and measured the 14 C content of the CO 2 to distinguish between short- and long-lived carbon. The total emissions were 1.5 (± 0.2) g-fossil CO 2 m −3 of wastewater treated, 0.5 (± 0.1) g-CO 2 -eq of CH 4 m −3 , and 1.8 (± 0.5) g-CO 2 -eq of N 2 O m −3 , for a total of 3.9 (± 0.5) g-CO 2 -eq m −3 . This demonstrated that water reclamation can be a source of GHGs from long lived carbon, and thus a candidate for GHG reduction credit. From the 14 C measurements, we found that between 11.4% and 15.1% of the CO 2 directly emitted was derived from fossil sources, which challenges past assumptions that the direct CO 2 emissions from water reclamation contain only modern carbon. A comparison of our direct emission measurements with estimates of indirect emissions from several water production methods, however, showed that the direct emissions from water reclamation constitute only a small fraction of the plant's total GHG footprint. - Highlights: • Direct greenhouse gas emissions were measured at a wastewater reclamation plant. • These greenhouse gas emissions amounted to 3.9 (± 0.5) g-CO 2 -eq m −3 of wastewater. • 14 C analysis of the CO 2 emissions was conducted to determine the fossil component. • 11.4% to 15.1% of the emitted CO 2 was derived from fossil sources

  11. Report of the Integrated Program Planning Activity for the DOE Fusion Energy Sciences Program

    International Nuclear Information System (INIS)

    None

    2000-01-01

    This report of the Integrated Program Planning Activity (IPPA) has been prepared in response to a recommendation by the Secretary of Energy Advisory Board that, ''Given the complex nature of the fusion effort, an integrated program planning process is an absolute necessity.'' We, therefore, undertook this activity in order to integrate the various elements of the program, to improve communication and performance accountability across the program, and to show the inter-connectedness and inter-dependency of the diverse parts of the national fusion energy sciences program. This report is based on the September 1999 Fusion Energy Sciences Advisory Committee's (FESAC) report ''Priorities and Balance within the Fusion Energy Sciences Program''. In its December 5,2000, letter to the Director of the Office of Science, the FESAC has reaffirmed the validity of the September 1999 report and stated that the IPPA presents a framework and process to guide the achievement of the 5-year goals listed in the 1999 report. The National Research Council's (NRC) Fusion Assessment Committee draft final report ''An Assessment of the Department of Energy's Office of Fusion Energy Sciences Program'', reviewing the quality of the science in the program, was made available after the IPPA report had been completed. The IPPA report is, nevertheless, consistent with the recommendations in the NRC report. In addition to program goals and the related 5-year, 10-year, and 15-year objectives, this report elaborates on the scientific issues associated with each of these objectives. The report also makes clear the relationships among the various program elements, and cites these relationships as the reason why integrated program planning is essential. In particular, while focusing on the science conducted by the program, the report addresses the important balances between the science and energy goals of the program, between the MFE and IFE approaches, and between the domestic and international aspects

  12. Nuclear electric propulsion for planetary science missions: NASA technology program planning

    International Nuclear Information System (INIS)

    Doherty, M.P.

    1993-01-01

    This paper presents the status of technology program planning to achieve readiness of Nuclear Electric Propulsion technologies needed to meet the advanced propulsion system requirements for planetary science missions in the next century. The technology program planning is based upon technologies of significant maturity: ion electric propulsion and the SP-100 space nulcear power technologies. Detailed plans are presented herein for the required ion electric propulsion technology development and demonstration. Closer coordination between space nuclear power and space electric propulsion technology programs is a necessity as technology plans are being further refined in light of NEP concept definition and possible early NEP flight activities

  13. Ecological bases of land reclamation in the mining regions of Ukraine

    Science.gov (United States)

    Kharytonov, Mykola; Gumentyk, Myhailo; Heilmeier, Hermann

    2016-04-01

    The mining production is situated in the several provinces of Ukraine. Specification of the problem coal and mixed sulfide mining activities in Ukraine have resulted in the generation of hundreds of millions of tons of hazardous wastes consisting of rest of manganese and iron oxides, traces of rare elements, sulphur bearing minerals, such as pyrite. These wastes have been / are still deposited, throughout the years, in huge stockpiles and dams. Land restoration in the mining region takes several forms. One of the ways is land reclamation. This way includes forest, recreation and agricultural reclamation. Land reclamation in industrial regions is conducted in one technological cycle with the process of ore mining. The soil mass is taken off, piled up and heaped onto the land after the rock has been replaced. The ecohydrogeological background of reclaimed lands forming and exploration was worked out. It foresee an environment restoration of disturbed lands to manage flow down, atmospheric precipitations taking aside, the process of the reclaimed profile biogenetic horizons formation and promotion with total depth 1.0-1.2 m and involvement of more suitable rocks and artificial drainage building. The effectiveness of different models of land reclamation and heavy metals migration through the rock-soil-plant system was investigated. Field experiments were carried out to study the adaptive potential of plants having different requirements for substrate fertility, with the main task to assess the prospects of land management for the rocks of the Nikopol manganese basin. The rocks exposed to the surface after manganese ore mining, first technical stage of landscape restoration, and plant melioration stages pass into other geochemical conditions and change their physical-chemical properties. During long-term melioration crops have dramatically improved some processes as following: bioweathering of rocks, phytomeliorated rocks fertility growth, etc. Meantime some rocks

  14. Environmental development plan for transportation programs: FY80 update

    Energy Technology Data Exchange (ETDEWEB)

    Saricks, C.L.; Singh, M.K.; Bernard, M.J. III; Bevilacqua, O.M.

    1980-09-01

    This is the second annual update of the environmental development plan (EDP) for transportation programs. It has been prepared as a cooperative effort of the Assistant Secretaries for Conservation and Solar Energy (ASCS) Office of Transportation Programs (CS/TP) and the Environment (ASEV) Office of Environmental Assessments. EDPs identify the ecosystem, resource, physical environment, health, safety, socioeconomic, and environmental control concerns associated with DOE programs. The programs include the research, development, demonstration, and assessment (RDD and A) of 14 transportation technologies and several strategy implementation projects. This EDP update presents a research and assessment plan for resolving any potentially adverse environmental concerns arising from these programs. The EDP process provides a framework for: incorporating environmental concerns into CS/TP planning and decision processes early to ensure they are assigned the same importance as technological, fiscal, and institutional concerns in decision making; resolving environmental concerns concurrently with energy technology and strategy development; and providing a research schedule that mitigates adverse environmental effects through sound technological design or policy analysis. This EDP also describes the status of each environmental concern and the plan for its resolution. Much of ongoing DOE reseirch and technology development is aimed at resolving concerns identified in this EDP. Each EDP is intended to be so comprehensive that no concerns escape notice. Care is taken to include any CS/TP action that may eventually require an Environmental Impact Statement. Because technology demonstration and commercialization tend to raise more environmental concerns than other portions of the transportation program, most of this EDP addresses these concerns.

  15. Coal Mines, Reclamation Sites - Mine Drainage Treatment/Land Recycling Project Locations

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Mine Drainage Treatment/Land Reclamation Locations are clean-up projects that are working to eliminate some form of abandoned mine. The following sub-facility types...

  16. The Situation Analysis Study of the family planning program in Kenya.

    Science.gov (United States)

    Miller, R A; Ndhlovu, L; Gachara, M M; Fisher, A A

    1991-01-01

    A new, relatively "quick and clean" operations research approach called a "situation analysis" was developed for examining the strengths and weaknesses of the family planning program of Kenya. Field research teams visited a stratified random sample of 99 of the Ministry of Health's approximately 775 service delivery points. Observation techniques and interviewing were used to collect information on program components and on the quality of care provided to new family planning clients during the observation day. As late as 1986, the Kenya program was rated "weak" and "poor" in the international literature. The Kenya Situation Analysis Study found a functioning, integrated maternal and child health/family planning program serving large numbers of clients, with an emphasis on oral contraceptives and Depo-Provera (and an underemphasis on permanent methods). Although a number of program problems were revealed by the study, overall, in terms of performance, a rating of "moderate" is suggested as more appropriate for Kenya's national family planning program today. In terms of the quality of care, a "moderate to moderate-high" rating is suggested.

  17. Program plan, and request for reprogramming first year funds. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-10

    In June of 1992, the U. S. Department of Energy (DOE) awarded assistance Medical University of South Carolina (MUSC) for the Environmental Hazards Assessment Program, The first year of the program is primarily a planning year. We have aggressively pursued input into the EHAP program to begin to understand where our efforts fit within other efforts underway nationally. We have also begun some direct activities at MUSC to begin the program. Part of this report is devoted to informing DOE of what we have accomplished so far this year. In our efforts to plan, we have identified several changes in emphasis for the program. These changes affect the original plan in terms of projected milestones and budget allocations. Part of this report describes these changes and describes the proposed changes to the budget. We are not requesting additional funds for this year. Simply, we are requesting some change in allocations to budget categories. Therefore, our report to DOE is a combination status report, program plan, and request for reallocation of budget.

  18. A thick homogeneous vegetated cover design proves cost - and schedule-effective for the reclamation of uranium mills sites near Spokane, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Blacklaw, J.; Robertson, G.; Stoffel, D.; Ahmad, J.; Fordham, E. [Washington State Dept. of Health, Olympia, WA (United States)] [and others

    1997-08-01

    The Washington State Department of Health (WDOH) has licensed two medium sized uranium mills with tailings impoundments covering 28 and 40 hectares (70 and 100 acres), respectively, The uranium mill licensees have submitted closure and reclamation plans to the state, and site-specific conditions have determined the closure design features, Conventional uranium mill cover designs usually incorporate an overall cap of one to three meters, which includes a low-permeability clay barrier layer. A technical evaluation of several uranium mill facilities that used this design was published in the fall of 1994 and reported that unexpected vegetation root damage had occurred in the low-permeability clay (or bentonite amended) barrier layers. The technical report suggested that the low-permeability design feature at some sites could be compromised within a very short time and the regulatory goal of 1,000 years performance might not be achieved. In October 1994, WDOH sponsored a technical forum meeting to consider design alternatives to address these reliability concerns. Representatives from the federal government, nuclear industry, licensees, engineering firms, and state regulatory agencies attended the workshop. Risk factors considered in the evaluation of the uranium mill reclamation plans include: (1) radon gas emanation through the cover (the air pathway), and (2) migration of hazardous and/or radioactive constituents (the groundwater pathway). Additional design considerations include site structural stability, longevity of 1,000 years, and no active (ongoing) maintenance. 9 refs.

  19. Human Research Program Integrated Research Plan. Revision A January 2009

    Science.gov (United States)

    2009-01-01

    The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.

  20. A Fuzzy Linear Programming Approach for Aggregate Production Planning

    DEFF Research Database (Denmark)

    Iris, Cagatay; Cevikcan, Emre

    2014-01-01

    a mathematical programming framework for aggregate production planning problem under imprecise data environment. After providing background information about APP problem, together with fuzzy linear programming, the fuzzy linear programming model of APP is solved on an illustrative example for different a...

  1. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required.

  2. Financial services FY 1996 site support program plan, WBS 6.10.4. Revision 1

    International Nuclear Information System (INIS)

    Schafer, D.D.

    1995-09-01

    This program plan outlines the financial services to be provided to the Hanford reservation by the Westinghouse Hanford Company. The topics of the plan include the Hanford strategic plan, program mission, program strategy, technical requirements baseline, schedule baseline, cost baseline, performance measures, technical objectives, program performance and program funding required

  3. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  4. Coal mine site reclamation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-02-15

    Coal mine sites can have significant effects on local environments. In addition to the physical disruption of land forms and ecosystems, mining can also leave behind a legacy of secondary detrimental effects due to leaching of acid and trace elements from discarded materials. This report looks at the remediation of both deep mine and opencast mine sites, covering reclamation methods, back-filling issues, drainage and restoration. Examples of national variations in the applicable legislation and in the definition of rehabilitation are compared. Ultimately, mine site rehabilitation should return sites to conditions where land forms, soils, hydrology, and flora and fauna are self-sustaining and compatible with surrounding land uses. Case studies are given to show what can be achieved and how some landscapes can actually be improved as a result of mining activity.

  5. 76 FR 64043 - Iowa Regulatory Program

    Science.gov (United States)

    2011-10-17

    ...) Requirements for permits for special categories of mining. 27--40.41(207) Permanent regulatory program--small... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 915 [Docket No. IA-016-FOR; Docket ID: OSM-2011-0014] Iowa Regulatory Program AGENCY: Office of Surface Mining...

  6. Operations program plan: Revision 3

    International Nuclear Information System (INIS)

    1988-07-01

    This document, the Operations Program Plan (OPP), has been developed as the seven-year master plan for operation of WIPP. The OPP was authorized by the Albuquerque Field Office of the Department of Energy (DOE-AL) and that organization's WIPP Project Office (DOE-WPO) in Carlsbad, New Mexico. The OPP is the directive from the DOE-WPO Project Manager as to how the WIPP is to be managed, operated, and administered. As the top tier management document for WIPP, the OPP establishes organizational responsibilities and an organizational structure for the Waste Isolation Division (WID) of Westinghouse Electric Corporation. The OPP sets policy and tone for conducting WIPP operations; it requires and specifically authorizes implementing documents (e.g., manuals). It has also proven instrumental in the budgeting and planning process, most particularly in expediting the preparation of specific budgets and detailed schedules for each of the numerous work packages. The OPP is also used to communicate information about WIPP operations

  7. Savannah River Interim Waste Management Program Plan - FY 1986

    International Nuclear Information System (INIS)

    1985-09-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1986. In addition, the document projects activities for several years beyond 1986 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of May 1985

  8. Savannah River Interim Waste Management Program plan, FY-1987

    International Nuclear Information System (INIS)

    1986-09-01

    This document provides the program plan as requested by the Savannah River Operations office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the interim waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1987. In addition, the document projects activities for several years beyond 1987 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of June 1986

  9. Are men well served by family planning programs?

    Science.gov (United States)

    Hardee, Karen; Croce-Galis, Melanie; Gay, Jill

    2017-01-23

    Although the range of contraceptives includes methods for men, namely condoms, vasectomy and withdrawal that men use directly, and the Standard Days Method (SDM) that requires their participation, family planning programming has primarily focused on women. What is known about reaching men as contraceptive users? This paper draws from a review of 47 interventions that reached men and proposes 10 key considerations for strengthening programming for men as contraceptive users. A review of programming shows that men and boys are not particularly well served by programs. Most programs operate from the perspective that women are contraceptive users and that men should support their partners, with insufficient attention to reaching men as contraceptive users in their own right. The notion that family planning is women's business only is outdated. There is sufficient evidence demonstrating men's desire for information and services, as well as men's positive response to existing programming to warrant further programming for men as FP users. The key considerations focus on getting information and services where men and boys need it; addressing gender norms that affect men's attitudes and use while respecting women's autonomy; reaching adolescent boys; including men as users in policies and guidelines; scaling up successful programming; filling gaps with implementation research and monitoring & evaluation; and creating more contraceptive options for men.

  10. The Philippine Population Program strategic plan (1981-1985).

    Science.gov (United States)

    1980-01-01

    The challenge of the population problem is to effectively mobilize the country's population for productive activity. Rather than simply concern with controlling numbers, emphasis is on human resource management, the structure of employment, labor productivity and income distribution. The long-term Philippine Development Plans reflect recognition of the dynamic interaction between fertility, productivity and welfare. Objectives of the 5-Year Philippine Development Plan 1978-1982, the 10-Year Plan 1978-1987, and the Long-Term Plan to year 2000 integrate population concerns and socioeconomic goals. These objectives include the following: promotion of social development and social justice; attainment of self-sufficiency in food and greater self-reliance in energy; increased development of lagging regions, especially rural areas; improvements of habitat through the development of human settlements and proper management of the environment; and maintenance of population growth at levels conducive to national welfare. Some population concerns that are directly relevant to welfare (in addition to those related to productivity) are distribution patterns of social goods and services, access to services by sectors of the population, and buying power of families. As a total population policy should establish closer linkages, operationally, between the demographic aspects and the productivity and welfare aspects of development, the mission of the National Population Program encompasses 3 areas: fertility; productivity; and welfare. Strategic policies include the following: abortion is unacceptable as a contraceptive method; the population program shall be non-coercive; and the program shall view individual and family welfare in the context and as the main objective of national socioeconomic programs.

  11. Reclamation after oil and gas development does not speed up succession or plant community recovery in big sagebrush ecosystems in Wyoming

    Science.gov (United States)

    Rottler, Caitlin M.; Burke, Ingrid C.; Palmquist, Kyle A.; Bradford, John B.; Lauenroth, William K.

    2018-01-01

    Article for intended outlet: Restoration Ecology. Abstract: Reclamation is an application of treatment(s) following a disturbance to promote succession and accelerate the return of target conditions. Previous studies have framed reclamation in the context of succession by studying its effectiveness in re-establishing late-successional plant communities. Re-establishment of these plant communities is especially important and potentially challenging in regions such as drylands and shrub steppe ecosystems where succession proceeds slowly. Dryland shrub steppe ecosystems are frequently associated with areas rich in fossil-fuel energy sources, and as such the need for effective reclamation after disturbance from fossil-fuel-related energy development is great. Past research in this field has focused primarily on coal mines; few researchers have studied reclamation after oil and gas development. To address this research gap and to better understand the effect of reclamation on rates of succession in dryland shrub steppe ecosystems, we sampled oil and gas wellpads and adjacent undisturbed big sagebrush plant communities in Wyoming, USA and quantified the extent of recovery for major functional groups on reclaimed and unreclaimed (recovered via natural succession) wellpads relative to the undisturbed plant community. Reclamation increased the rate of recovery for all forb and grass species as a group and for perennial grasses, but did not affect other functional groups. Rather, analyses comparing recovery to environmental variables and time since wellpad abandonment showed that recovery of other groups were affected primarily by soil texture and time since wellpad abandonment. This is consistent with studies in other ecosystems where reclamation has been implemented, suggesting that reclamation may not help re-establish late-successional plant communities more quickly than they would re-establish naturally.

  12. Handling of CFC's - on-site recycling versus off-site reclamation

    International Nuclear Information System (INIS)

    Gras, S.

    1993-01-01

    Most contractors will be doing both programs to one degree or another. There will be times when the refrigerant is brand new, when a very minor problem requires servicing and the CFCs will be put right back in with no concerns about quality. There will be other times that it makes more sense to have the gas reclaimed because of burn-out. Where equipment reliability is a prerequisite and the quality of the gas is imperative, the CFC management process should be through a reclamation center. Contractors can do this themselves or deal with a low cost/no cost CFC service that will do it for them. Both options have their merits and on every recovery occasion the contractor will have to make a judgement call. They are, after all, the ones that will carry all the associated risks and responsibilities. Let's hope they make the right decisions, and within the context of good CFC management

  13. Planning Student Flow with Linear Programming: A Tunisian Case Study.

    Science.gov (United States)

    Bezeau, Lawrence

    A student flow model in linear programming format, designed to plan the movement of students into secondary and university programs in Tunisia, is described. The purpose of the plan is to determine a sufficient number of graduating students that would flow back into the system as teachers or move into the labor market to meet fixed manpower…

  14. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  15. The Managers’ Experiential Learning of Program Planning in Active Ageing Learning Centers

    Directory of Open Access Journals (Sweden)

    Chun-Ting Yeh

    2016-12-01

    Full Text Available Planning older adult learning programs is really a complex work. Program planners go through different learning stages and accumulate experiences to be able to undertake the task alone. This study aimed to explore the experiential learning process of older adult learning program planners who work in the Active Ageing Learning Centers (AALCs. Semi-structure interviews were conducted with seven program planners. The findings of this study were identified as follows. 1 Before being a program planner, the participants’ knowledge results from grasping and transforming experience gained from their family, their daily lives and past learning experiences; 2 after being a program planner, the participants’ experiential learning focused on leadership, training in the institute, professional development, as well as involvement in organizations for elderly people; and 3 the participants’ experiential learning outcomes in the older adult learning program planning include: their ability to reflect on the appropriateness and fulfillment of program planning, to apply theoretical knowledge and professional background in the field, and to make plans for future learning and business strategies.

  16. Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) program plan: Executive summary

    International Nuclear Information System (INIS)

    McGinnis, C.P.; Eisenhower, B.M.; Reeves, M.E.; DePaoli, S.M.; Stinton, L.H.; Harrington, E.H.

    1989-02-01

    The Hazardous Waste Development, Demonstration, and Disposal (HAZWDDD) Program Plan provides a strategy for management of hazardous and mixed wastes generated by the five Department of Energy (DOE) installations managed by Martin Marietta Energy Systems, Inc. (Energy Systems). This integrated corporate plan is based on the individual installation plans, which identify waste streams, facility capabilities, problem wastes, future needs, and funding needs. Using this information, the corporate plan identifies common concerns and technology/facility needs over the next 10 years. The overall objective of this corporate plan is to ensure that treatment, storage, and disposal (TSD) needs for all hazardous and mixed wastes generated by Energy Systems installations have been identified and planned for. Specific objectives of the program plan are to (1) identify all hazardous and mixed waste streams; (2) identify hazardous and mixed waste TSD requirements; (3) identify any unresolved technical issues preventing implementation of the strategy; (4) develop schedules for studies, demonstrations, and facilities to resolve the issues; and (5) define the interfaces with the Low-Level Waste Disposal Development and Demonstration (LLWDDD) Program. 10 refs., 7 figs

  17. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  18. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond

  19. National Waste Terminal Storage Program: information management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    A comprehensive information management plan to provide for the systematic processing of large amounts of internally prepared and externally acquired documentation that will accrue to the Office of Waste Isolation (OWI) during the next decade is outlined. The Information Management Plan of the National Waste Terminal Storage (NWTS) Program is based on time proven procedures developed by government and industry for the requirements determination, acquisition, and the administration of documentation. The NWTS Information Management Plan is designed to establish the basis for the planning, development, implemenation, operation and maintenance of the NWTS Information Management System. This plan will help assure that documentation meets required quality standards and that each organization's needs are reflected when soliciting documentation from subcontractors. An example would be the Quality Assurance documentation requirement necessary to comply with eventual NRC licensing regulations. The provisions of the NWTS Information Management Plan will apply to all documentation from OWI contractors, subcontractors, and suppliers, and to OWI organizations for documentation prepared periodically for external dissemination

  20. Hanford Site waste tank farm facilities design reconstitution program plan

    International Nuclear Information System (INIS)

    Vollert, F.R.

    1994-01-01

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980's has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan