WorldWideScience

Sample records for reactors prime contractor

  1. 48 CFR 45.501 - Prime contractor alternate locations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  2. 75 FR 43166 - Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients

    Science.gov (United States)

    2010-07-23

    ...] Information Collection; Central Contractor Registration Requirements for Prime Grant Recipients AGENCY: Office... information collection requirement regarding Central Contractor Registration Requirements for Prime Grant... for the proper performance of functions of the Central Contractor Registration Requirements for Prime...

  3. Searching for Contracting Patterns over Time: Do Prime Contractor and Subcontractor Relations Follow Similar Patterns for Professional Services Provision?

    Science.gov (United States)

    Ponomariov, Branco; Kingsley, Gordon; Boardman, Craig

    2011-01-01

    This paper compares over a 12-year period (1) patterns of contracting between a state transportation agency and its prime contractors providing engineering design services with (2) patterns between these prime contractors and their subcontractors. We find evidence of different contracting patterns at each level that emerge over time and coexist in…

  4. 48 CFR 1019.202-70-5 - Incentives for prime contractor participation.

    Science.gov (United States)

    2010-10-01

    ... DEPARTMENT OF THE TREASURY SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Policies 1019.202-70-5 Incentives for prime contractor participation. (a) Under the Small Business Act, 15 U.S.C. 637(d)(4)(E), Treasury....219-75. (c) Before awarding a contract that requires a subcontracting plan, the existence of a mentor...

  5. 48 CFR 3052.219-72 - Evaluation of prime contractor participation in the DHS mentor-protégé program.

    Science.gov (United States)

    2010-10-01

    ... contractor participation in the DHS mentor-protégé program. 3052.219-72 Section 3052.219-72 Federal... Evaluation of prime contractor participation in the DHS mentor-protégé program. As prescribed in (HSAR) 48... the DHS Mentor-Protégé Program (JUN 2006) This solicitation contains a source selection factor or...

  6. 78 FR 30233 - Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access to...

    Science.gov (United States)

    2013-05-22

    ... Number 0750-AG38 Defense Federal Acquisition Regulation Supplement; Government Support Contractor Access... Government support contractors to have access to proprietary technical data belonging to prime contractors and other third parties, provided that the technical data owner may require the support contractor to...

  7. Research reactor decommissioning experience - concrete removal and disposal -

    International Nuclear Information System (INIS)

    Manning, Mark R.; Gardner, Frederick W.

    1990-01-01

    Removal and disposal of neutron activated concrete from biological shields is the most significant operational task associated with research reactor decommissioning. During the period of 1985 thru 1989 Chem-Nuclear Systems, Inc. was the prime contractor for complete dismantlement and decommissioning of the Northrop TRIGA Mark F, the Virginia Tech Argonaut, and the Michigan State University TRIGA Mark I Reactor Facilities. This paper discusses operational requirements, methods employed, and results of the concrete removal, packaging, transport and disposal operations for these (3) research reactor decommissioning projects. Methods employed for each are compared. Disposal of concrete above and below regulatory release limits for unrestricted use are discussed. This study concludes that activated reactor biological shield concrete can be safely removed and buried under current regulations

  8. Prometheus Project Reactor Module Final Report, For Naval Reactors Information

    International Nuclear Information System (INIS)

    MJ Wollman; MJ Zika

    2006-01-01

    The Naval Reactors Prime Contractor Team (NRPCT) led the development of a power plant for a civilian nuclear electric propulsion (NEP) system concept as part of the Prometheus Project. This report provides a summary of the facts, technical insights, and programmatic perspectives gained from this two-year program. The Prometheus Project experience has been extensively documented to better position the US for future space reactor development. Major Technological and engineering challenges exist to develop a system that provides useful electric power from a nuclear fission heat source operating in deep space. General issues include meeting mission requirements in a system that has a mass low enough to launch from earth while assuring public safety and remaining safely shutdown during credible launch accidents. These challenges may be overcome in the future if there is a space mission with a compelling need for nuclear power to drive development. Past experience and notional mission requirements indicate that any useful space reactor system will be unlike past space reactors and existing terrestrial reactors

  9. 40 CFR 35.938-6 - Progress payments to contractors.

    Science.gov (United States)

    2010-07-01

    ... on nor diverted to another job; and (iii) A fabrication period of more than 6 months is anticipated...: (i) A first payment upon submission by the prime contractor of shop drawings for the equipment or...

  10. Naval Reactors Prime Contractor Team (NRPCT) Experiences and Considerations With Irradiation Test Performance in an International Environment

    International Nuclear Information System (INIS)

    MH Lane

    2006-01-01

    This letter forwards a compilation of knowledge gained regarding international interactions and issues associated with Project Prometheus. The following topics are discussed herein: (1) Assessment of international fast reactor capability and availability; (2) Japanese fast reactor (JOYO) contracting strategy; (3) NRPCT/Program Office international contract follow; (4) Completion of the Japan Atomic Energy Agency (JAEA)/Pacific Northwest National Laboratory (PNNL) contract for manufacture of reactor test components; (5) US/Japanese Departmental interactions and required Treaties and Agreements; and (6) Non-technical details--interactions and considerations

  11. Naval Reactors Prime Contractor Team (NRPCT) Experiences and Considerations With Irradiation Test Performance in an International Environment

    Energy Technology Data Exchange (ETDEWEB)

    MH Lane

    2006-02-15

    This letter forwards a compilation of knowledge gained regarding international interactions and issues associated with Project Prometheus. The following topics are discussed herein: (1) Assessment of international fast reactor capability and availability; (2) Japanese fast reactor (JOYO) contracting strategy; (3) NRPCT/Program Office international contract follow; (4) Completion of the Japan Atomic Energy Agency (JAEA)/Pacific Northwest National Laboratory (PNNL) contract for manufacture of reactor test components; (5) US/Japanese Departmental interactions and required Treaties and Agreements; and (6) Non-technical details--interactions and considerations.

  12. Lessons learned from the licensing process for the Clinch River Breeder Reactor Plant

    International Nuclear Information System (INIS)

    Dickson, P.W.; Clare, G.H.

    1991-01-01

    This paper presents the experience of licensing a specific liquid-metal fast breeder reactor (LMFBR), the Clinch River Breader Reactor Plant (CRBRP). It was a success story in that the licensing process was accomplished in a very short time span. The actions of the applicant and the actions of the US Nuclear Regulatory Commission (NRC) in response are presented and discussed to provide guidance to future efforts to license unconventional reactors. The history is told from the perspective of the authors. As such, some of the reasons given for success or lack of success are subjective interpretations. Nevertheless, the authors' positions provided them an excellent viewpoint to make these judgements. During the second phase of the licensing process, they were the CRBRP Technical Director and the Licensing Manager, respectively, for the Westinghouse Electric Corporation, the prime contractor for the reactor plant

  13. Application of Shuttle Remote Manipulator System technology to the replacement of fuel channels in the Pickering CANDU reactor

    International Nuclear Information System (INIS)

    Stratton, D.; Butt, C.

    1982-04-01

    Spar Aerospace Limited of Toronto was the prime contractor to the National Research Council of Canada for the design and development of the Shuttle Remote Manipulator (SRMS). Spar is presently under contract to Ontario Hydro to design and build a Remote Manipulation Control System to replace the fuel channels in the Pickering A Nuclear Generating Station. The equipment may be used to replace the fuel channels in six other early generation CANDU reactors

  14. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  15. Contractor evaluations in the contractor selection process.

    Science.gov (United States)

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  16. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  17. Contractor safety

    International Nuclear Information System (INIS)

    Blanton, M.L.; Montgomery, E.W.

    1991-01-01

    The recent trend in the United States and Shell Oil Company EandP has been to increase use of contractors to do specialized work. Many companies now use contractors almost exclusively for operations such as drilling, well workovers, construction, and many specialty and routine maintenance tasks. Today, approximately 75% of Shell Oil Company's actual operating work force in EandP is contract. Clearly, HSandE considerations must become an increasingly important part of the contractor selection process. This paper reports on the Shell Oil Company's evolution from a bidder selection process to a program of Matching Owner and Contractor. Well has begun to expand efforts to make better assessments of contractor's HSandE capabilities and values in pre-bid considerations. Focus is on pre-bid evaluations to select contractors that have strong HSandE commitments and values. Contractor safety performance in this industry must be brought up to the same standards as operating companies. In Shell Oil EandP is only willing to contractors who can and are willing to do that

  18. Supplier-contractor collaboration in the construction industry : A taxonomic approach to the literature of the 2000-2009 decade

    NARCIS (Netherlands)

    Bemelmans, J.; Voordijk, H.; Vos, G.C.J.M.; Buter, J.

    2012-01-01

    Purpose – Recent developments in the construction industry resulted in an increased importance of collaboration with and managing of suppliers by prime contractors. The focus of this study is on getting insights into existing knowledge on this topic and the gaps in this knowledge base. The goals of

  19. Supplier-contractor collaboration in the construction industry, a taxonomic approach to the literature of the 2000-2009 decade

    NARCIS (Netherlands)

    Bemelmans, Jeroen; Voordijk, Johannes T.; Vos, B.

    2012-01-01

    Purpose – Recent developments in the construction industry resulted in an increased importance of collaboration with and managing of suppliers by prime contractors. The focus of this study is on getting insights into existing knowledge on this topic and the gaps in this knowledge base. The goals of

  20. Safety issues at the defense production reactors

    International Nuclear Information System (INIS)

    1987-01-01

    The United States produces plutonium and tritium for use in nuclear weapons at the defense production reactors - the N Reactor in Washington and the Savannah River reactors in South Carolina. This report reaches general conclusions about the management of those reactors and highlights a number of safety and technical issues that should be resolved. The report provides an assessment of the safety management, safety review, and safety methodology employed by the Department of Energy and the private contractors who operate the reactors for the federal government. This report examines the safety objective established by the Department of Energy for the production reactors and the process the Department of its contractors use to implement the objective; focuses on a variety of uncertainties concerning the production reactors, particularly those related to potential vulnerabilities to severe accidents; and identifies ways in which the DOE approach to management of the safety of the production reactors can be improved

  1. Contractor management

    NARCIS (Netherlands)

    Ustailieva, E.; Starren, A.

    2013-01-01

    Companies function more and more in networks (i.e. contractor chains with contractors, suppliers and/or other companies. This asks for several companies/parties to work together to get the work done. Working in contractor chains is very common in sectors like maintenance, construction, cleaning, and

  2. The Jules Horowitz Reactor project, a driver for revival of the research reactor community

    International Nuclear Information System (INIS)

    Pere, P.; Cavailler, C.; Pascal, C.

    2010-01-01

    The first concrete of the nuclear island for the Jules Horowitz Reactor (JHR) was poured at the end of July 2009 and construction is ongoing. The JHR is the largest new platform for irradiation experiments supporting Generation II and III reactors, Generation IV technologies, and radioisotope production. This facility, composed of a unique grouping of workshops, hot cells and hot laboratories together with a first-rate MTR research reactor, will ensure that the process, from preparations for irradiation experiments through post-irradiation non-destructive examination, is completed expediently, efficiently and, of course, safely. In addition to the performance requirements to be met in terms of neutron fluxes on the samples (5x10 14 n.cm -2 /sec -1 E>1 MeV in core and 3,6x10 14 n.cm -2 /sec -1 E<0.625 eV in the reflector) and the JHR's considerable irradiation capabilities (more than 20 experiments and one-tenth of irradiation area for simultaneous radioisotope production), the JHR is the first MTR to be built since the end of the 1960s, making this an especially challenging project. The presentation will provide an overview of the reactor, hot cells and laboratories and an outline of the key milestones in the project schedule, including initial criticality in early 2014 and radioisotope production in 2015. This will be followed by a description of the project organization set up by the CEA as owner and future operator and AREVA TA as prime contractor and supplier of critical systems, and a discussion of project challenges, especially those dealing with the following items:accommodation of a broad experimental domain; involvement by international partners making in-kind contributions to the project; ? development of components critical to safety and performance; the revival of engineering of research reactors and experimental devices involving France's historical players in the field of research reactors, and; tools to carry out the project, including computer codes

  3. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards

  4. 48 CFR 252.229-7004 - Status of contractors as a direct contractor (Spain).

    Science.gov (United States)

    2010-10-01

    ... direct contractor (Spain). 252.229-7004 Section 252.229-7004 Federal Acquisition Regulations System... contractor (Spain). As prescribed in 229.402-70(d), use the following clause: Status of Contractor as a Director Contractor (Spain) (JUN 1997) (a) “Direct Contractor,” as used in this clause, means an individual...

  5. Reactor operation safety information document

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  6. Speech by Prime Minister Francois Fillon. Visit of the Jules Horowitz experimental reactor works on the Commissariat a l'Energie et aux Energies Alternatives site. Cadarache, May 3, 2010

    International Nuclear Information System (INIS)

    2010-01-01

    In this speech, the French Prime Minister evokes the present context, the importance of strategic technologies, and the challenge of investing in these technologies within a context of reduction of public expenses. He comments the decision of his government to finance research and education activities in different domains, and more specifically in the energy sector with this fourth generation Jules Horowitz experimental reactor. He recalls that the nuclear sector has always been very important to the eyes of the successive French governments, and outlines how this reactor will contribute to reactor operational optimization, lifetime extension and safety, nuclear fuel development, etc.

  7. The Jules Horowitz reactor project, a driver for revival of the research reactor community

    Energy Technology Data Exchange (ETDEWEB)

    Pere, P.; Cavailler, C.; Pascal, C. [AREVA TA, CEA Cadarache - Etablissement d' AREVA TA - Chantier RJH - MOE - BV2 - BP no. 9 - 13115 Saint Paul lez Durance (France); CS 50497 - 1100, rue JR Gauthier de la Lauziere, 13593 Aix en Provence cedex 3 (France)

    2010-07-01

    The first concrete of the nuclear island for the Jules Horowitz Reactor (JHR) was poured at the end of July 2009 and construction is ongoing. The JHR is the largest new platform for irradiation experiments supporting Generation II and III reactors, Generation IV technologies, and radioisotope production. This facility, composed of a unique grouping of workshops, hot cells and hot laboratories together with a first -rate MTR research reactor, will ensure that the process, from preparations for irradiation experiments through post-irradiation non-destructive examination, is completed expediently, efficiently and, of course, safely. In addition to the performance requirements to be met in terms of neutron fluxes on the samples (5x10{sup 14} n.cm{sup -2}/sec{sup -1} E> 1 MeV in core and 3,6x10{sup 14} n.cm{sup -2}/sec{sup -1} E<0.625 eV in the reflector) and the JHR's considerable irradiation capabilities (more than 20 experiments and one-tenth of irradiation area for simultaneous radioisotope production), the JHR is the first MTR to be built since the end of the 1960's, making this an especially challenging project. The presentation will provide an overview of the reactor, hot cells and laboratories and an outline of the key milestones in the project schedule, including initial criticality in early 2014 and radioisotope production in 2015. This will be followed by a description of the project organization set up by the CEA as owner and future operator and AREVA TA as prime contractor and supplier of critical systems, and a discussion of project challenges, especially those dealing with the following items: - accommodation of a broad experimental domain, - involvement by international partners making in-kind contributions to the project, - development of components critical to safety and performance, - the revival of engineering of research reactors and experimental devices involving France's historical players in the field of research reactors, and

  8. Space Nuclear Power Plant Pre-Conceptual Design Report, For Information

    Energy Technology Data Exchange (ETDEWEB)

    B. Levine

    2006-01-27

    This letter transmits, for information, the Project Prometheus Space Nuclear Power Plant (SNPP) Pre-Conceptual Design Report completed by the Naval Reactors Prime Contractor Team (NRPCT). This report documents the work pertaining to the Reactor Module, which includes integration of the space nuclear reactor with the reactor radiation shield, energy conversion, and instrumentation and control segments. This document also describes integration of the Reactor Module with the Heat Rejection segment, the Power Conditioning and Distribution subsystem (which comprise the SNPP), and the remainder of the Prometheus spaceship.

  9. Introductory user's manual for the US Nuclear Regulatory Commission Reactor Safety Research Data Bank

    International Nuclear Information System (INIS)

    Scofield, N.R.; Hardy, H.A.; Laats, E.T.

    1984-03-01

    The United States NRC has established the NRC/Division of Accident Evaluation (DAE) Data Bank Program to collect, store, and make available data from the many domestic and foreign water reactor safety research programs. Local direction of the program is provided by EG and G Idaho, Inc., prime contractor for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). The NRC/DAE Data Bank Program provides a central computer storage mechanism and access software for data that is to be used by code development and assessment groups in meeting the code and correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, training, and advisory services to users and the NRC. The NRC/DAE Data Bank and the capabilities of the data access software are described in this document

  10. Design guide for Category III reactors: pool type reactors

    International Nuclear Information System (INIS)

    Brynda, W.J.; Lobner, P.R.; Powell, R.W.; Straker, E.A.

    1978-11-01

    The Department of Energy (DOE) in the ERDA Manual requires that all DOE-owned reactors be sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that gives adequate consideration to health and safety factors. Specific guidance pertinent to the safety of DOE-owned reactors is found in Chapter 0540 of the ERDA Manual. The purpose of this Design Guide is to provide additional guidance to aid the DOE facility contractor in meeting the requirement that the siting, design, construction, modification, operation, maintenance, and decommissioning of DOE-owned reactors be in accordance with generally uniform standards, guides, and codes which are comparable to those applied to similar reactors licensed by the Nuclear Regulatory Commission (NRC). This Design Guide deals principally with the design and functional requirement of Category III reactor structures, components, and systems

  11. Activated Sludge and Aerobic Biofilm Reactors

    OpenAIRE

    Von Sperling, Marcos

    2007-01-01

    "Activated Sludge and Aerobic Biofilm Reactors is the fifth volume in the series Biological Wastewater Treatment. The first part of the book is devoted to the activated sludge process, covering the removal of organic matter, nitrogen and phosphorus.A detailed analysis of the biological reactor (aeration tank) and the final sedimentation tanks is provided. The second part of the book covers aerobic biofilm reactors, especially trickling filters, rotating biological contractors and submerged ae...

  12. Introductory user's manual for the US Nuclear Regulatory Commission Reactor Safety Research Data Bank. Revision 3

    International Nuclear Information System (INIS)

    Hardy, H.A.; Laats, E.T.

    1985-03-01

    The United States Nuclear Regulatory Commission (USNRC) has established the NRC/Division of Accident Evaluation (DAE) Data Bank Program to collect, store, and make available data from the many domestic and foreign water reactor safety research programs. Local direction of the program is provided by EG and G Idaho, Inc., prime contractor for the Department of Energy (DOE) at the Idaho National Engineering Laboratory (INEL). The NRC/DAE Data Bank Program provides a central computer storage mechanism and access software for data to be used by code development and assessment groups in meeting the code correlation needs of the nuclear industry. The administrative portion of the program provides data entry, documentation, training, and advisory services to users and the USNRC. The NRC/DAE Data Bank and the capabilities of the data access software are described in this document

  13. Reexamining unconscious response priming: A liminal-prime paradigm.

    Science.gov (United States)

    Avneon, Maayan; Lamy, Dominique

    2018-03-01

    Research on the limits of unconscious processing typically relies on the subliminal-prime paradigm. However, this paradigm is limited in the issues it can address. Here, we examined the implications of using the liminal-prime paradigm, which allows comparing unconscious and conscious priming with constant stimulation. We adapted an iconic demonstration of unconscious response priming to the liminal-prime paradigm. On the one hand, temporal attention allocated to the prime and its relevance to the task increased the magnitude of response priming. On the other hand, the longer RTs associated with the dual task inherent to the paradigm resulted in response priming being underestimated, because unconscious priming effects were shorter-lived than conscious-priming effects. Nevertheless, when the impact of long RTs was alleviated by considering the fastest trials or by imposing a response deadline, conscious response priming remained considerably larger than unconscious response priming. These findings suggest that conscious perception strongly modulates response priming. Copyright © 2017 Elsevier Inc. All rights reserved.

  14. Safety-licensing assessment of NASAP reactor concepts and fuel cycle facilities

    International Nuclear Information System (INIS)

    Lipinski, W.C.; Prohammer, F.G.; van Erp, J.B.; Seefeldt, W.B.

    1978-06-01

    Assessments are presented of the safety/licensability of reactor concepts based on information supplied by the Nonproliferation Alternative Systems Assessment Program (NASAP) characterization contractors in their updated responses to the data package for NASAP Rolling Report II. The assessment of the LMFBR includes information from a characterization contractor on alternate fuel cycles but does not include information provided by a characterization contractor on plant-related safety issues. The information provided by the characterization contractors was supplemented by assessments provided by the U. S. Nuclear Regulatory Commission

  15. Nuclear reactors built, being built, or planned, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1994. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: a commercial reactor locator map and tables of the characteristic and statistical data that follow; a table of abbreviations; tables of data for reactors operating, being built, or planned; and tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company -- working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).

  16. Nuclear reactors built, being built, or planned: 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    This report contains unclassified information about facilities built, being built, or planned in the US for domestic use or export as of December 31, 1995. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables of the characteristic and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company--working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).

  17. Nuclear reactors built, being built, or planned, 1994

    International Nuclear Information System (INIS)

    1995-07-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1994. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: a commercial reactor locator map and tables of the characteristic and statistical data that follow; a table of abbreviations; tables of data for reactors operating, being built, or planned; and tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company -- working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5)

  18. Nuclear reactors built, being built, or planned: 1995

    International Nuclear Information System (INIS)

    1996-08-01

    This report contains unclassified information about facilities built, being built, or planned in the US for domestic use or export as of December 31, 1995. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables of the characteristic and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled. The reactors are subdivided into the following parts: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is a US company--working either independently or in cooperation with a foreign company (Part 4). Critical assembly refers to an assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5)

  19. From demand driven contractor selection towards value driven contractor selection

    NARCIS (Netherlands)

    Walraven, A.R.; Vries, de B.

    2009-01-01

    The procurement of a construction contractor should consider more aspects than only cost or price. Taking value and price into account to select the ‘best value for money’ bid results in adopting a structured multicriteria approach. An alternative contractor selection method is presented, which

  20. Design guide for category II reactors light and heavy water cooled reactors

    International Nuclear Information System (INIS)

    Brynda, W.J.; Lobner, P.R.; Powell, R.W.; Straker, E.A.

    1978-05-01

    The Department of Energy (DOE), in the ERDA Manual, requires that all DOE-owned reactors be sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that gives adequate consideration to health and safety factors. Specific guidance pertinent to the safety of DOE-owned reactors is found in Chapter 0540 of the ERDA Manual. The purpose of this Design Guide is to provide additional guidance to aid the DOE facility contractor in meeting the requirement that the siting, design, construction, modification operation, maintainance, and decommissioning of DOW-owned reactors be in accordance with generally uniform standards, guide and codes which are comparable to those applied to similar reactors licensed by the Nuclear Regulatory Commission (NRC). This Design Guide deals principally with the design and functional requirements of Category II reactor structure, components, and systems

  1. Masked priming effect reflects evidence accumulated by the prime.

    Science.gov (United States)

    Kinoshita, Sachiko; Norris, Dennis

    2010-01-01

    In the same-different match task, masked priming is observed with the same responses but not different responses. Norris and Kinoshita's (2008) Bayesian reader account of masked priming explains this pattern based on the same principle as that explaining the absence of priming for nonwords in the lexical decision task. The pattern of priming follows from the way the model makes optimal decisions in the two tasks; priming does not depend on first activating the prime and then the target. An alternative explanation is in terms of a bias towards responding "same" that exactly counters the facilitatory effect of lexical access. The present study tested these two views by varying both the degree to which the prime predicts the response and the visibility of the prime. Unmasked primes produced effects expected from the view that priming is influenced by the degree to which the prime predicts the response. In contrast, with masked primes, the size of priming for the same response was completely unaffected by predictability. These results rule out response bias as an explanation of the absence of masked priming for different responses and, in turn, indicate that masked priming is not a consequence of automatic lexical access of the prime.

  2. Worldwide advanced nuclear power reactors with passive and inherent safety: What, why, how, and who

    International Nuclear Information System (INIS)

    Forsberg, C.W.; Reich, W.J.

    1991-09-01

    The political controversy over nuclear power, the accidents at Three Mile Island (TMI) and Chernobyl, international competition, concerns about the carbon dioxide greenhouse effect and technical breakthroughs have resulted in a segment of the nuclear industry examining power reactor concepts with PRIME safety characteristics. PRIME is an acronym for Passive safety, Resilience, Inherent safety, Malevolence resistance, and Extended time after initiation of an accident for external help. The basic ideal of PRIME is to develop power reactors in which operator error, internal sabotage, or external assault do not cause a significant release of radioactivity to the environment. Several PRIME reactor concepts are being considered. In each case, an existing, proven power reactor technology is combined with radical innovations in selected plant components and in the safety philosophy. The Process Inherent Ultimate Safety (PIUS) reactor is a modified pressurized-water reactor, the Modular High Temperature Gas-Cooled Reactor (MHTGR) is a modified gas-cooled reactor, and the Advanced CANDU Project is a modified heavy-water reactor. In addition to the reactor concepts, there is parallel work on super containments. The objective is the development of a passive ''box'' that can contain radioactivity in the event of any type of accident. This report briefly examines: why a segment of the nuclear power community is taking this new direction, how it differs from earlier directions, and what technical options are being considered. A more detailed description of which countries and reactor vendors have undertaken activities follows. 41 refs

  3. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  4. 76 FR 39015 - Contractor Performance Information

    Science.gov (United States)

    2011-07-05

    ...] Contractor Performance Information AGENCY: Environmental Protection Agency (EPA), ACTION: Direct final rule... contractor performance information. EPA is issuing a final rule because the changes are procedural in nature... Institutes of Health's Contractor Performance System (CPS) to the Department of Defense's Contractor...

  5. Contractor Selection in Saudi Arabia

    OpenAIRE

    M. A. Bajaber; M. A. Taha

    2012-01-01

    Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few ...

  6. Advanced CANDU reactors

    International Nuclear Information System (INIS)

    Dunn, J.T.; Finlay, R.B.; Olmstead, R.A.

    1988-12-01

    AECL has undertaken the design and development of a series of advanced CANDU reactors in the 700-1150 MW(e) size range. These advanced reactor designs are the product of ongoing generic research and development programs on CANDU technology and design studies for advanced CANDU reactors. The prime objective is to create a series of advanced CANDU reactors which are cost competitive with coal-fired plants in the market for large electricity generating stations. Specific plant designs in the advanced CANDU series will be ready for project commitment in the early 1990s and will be capable of further development to remain competitive well into the next century

  7. 48 CFR 46.105 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  8. Licensed reactor nuclear safety criteria applicable to DOE reactors

    International Nuclear Information System (INIS)

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC [Nuclear Regulatory Commission] licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor

  9. 49 CFR 199.245 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.245 Section 199.245... Prevention Program § 199.245 Contractor employees. (a) With respect to those covered employees who are contractors or employed by a contractor, an operator may provide by contract that the alcohol testing...

  10. 49 CFR 199.115 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Contractor employees. 199.115 Section 199.115... § 199.115 Contractor employees. With respect to those employees who are contractors or employed by a contractor, an operator may provide by contract that the drug testing, education, and training required by...

  11. 7 CFR 1726.27 - Contractor's bonds.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Contractor's bonds. 1726.27 Section 1726.27... AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES General § 1726.27 Contractor's bonds. (a) RUS Form 168b, Contractor's Bond, shall be used when a contractor's bond is required by RUS Forms 200, 257...

  12. 48 CFR 47.207-5 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor....207-5 Contractor responsibilities. Contractor responsibilities vary with the kinds of freight to be... furnished by the contractor. Otherwise, state that the contractor shall furnish clean and sound closed-type...

  13. DOE fundamentals handbook: Nuclear physics and reactor theory

    International Nuclear Information System (INIS)

    1993-01-01

    The Nuclear Physics and Reactor Theory Handbook was developed to assist nuclear facility operating contractors in providing operators, maintenance personnel, and the technical staff with the necessary fundamentals training to ensure a basic understanding of nuclear physics and reactor theory. The handbook includes information on atomic and nuclear physics; neutron characteristics; reactor theory and nuclear parameters; and the theory of reactor operation. This information will provide personnel with a foundation for understanding the scientific principles that are associated with various DOE nuclear facility operations and maintenance

  14. 48 CFR 18.102 - Central contractor registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Central contractor... Central contractor registration. Contractors are not required to be registered in the Central Contractor.... (See 4.1102). However, contractors are required to register with CCR in order to gain access to the...

  15. The law for the regulations of nuclear source materials, nuclear fuel materials and reactors

    International Nuclear Information System (INIS)

    1977-01-01

    Concerning refining, fabrication and reprocessing operations of such materials as well as the installation and operation of reactors, necessary regulations are carried out. Namely, in case of establishing the business of refining, fabricating and reprocessing nuclear materials as well as installing nuclear reactors, applications for the permission of the Prime Minister and the Minister of International Trade and Industry should be filed. Change of such operations should be permitted after filing applications. These permissions are retractable. As regards the reactors installed aboard foreign ships, it must be reported to enter Japanese waters and the permission by the Prime Minister must be obtained. In case of nuclear fuel fabricators, a chief technician of nuclear fuel materials (qualified) must be appointed per each fabricator. In case of installing nuclear reactors, the design and methods of construction should be permitted by the Prime Minister. The standard for such permission is specified, and a chief engineer for operating reactors (qualified) must be appointed. Successors inherit the positions of ones who have operated nuclear material refining, fabrication and reprocessing businesses or operated nuclear reactors. (Rikitake, Y.)

  16. 48 CFR 1845.502 - Contractor responsibility.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor responsibility. 1845.502 Section 1845.502 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE... Contractors 1845.502 Contractor responsibility. ...

  17. The law for the regulations of nuclear source materials, nuclear fuel materials and reactors

    International Nuclear Information System (INIS)

    1980-01-01

    The law intends under the principles of the atomic energy act to regulate the refining, processing and reprocessing businesses of nuclear raw and fuel metarials and the installation and operation of reactors for the peaceful and systematic utilization of such materials and reactors and for securing public safety by preventing disasters, as well as to control internationally regulated things for effecting the international agreements on the research, development and utilization of atomic energy. Basic terms are defined, such as atomic energy; nuclear fuel material; nuclear raw material; nuclear reactor; refining; processing; reprocessing; internationally regulated thing. Any person who is going to engage in refining businesses other than the Power Reactor and Nuclear Fuel Development Corporation shall get the special designation by the Prime Minister and the Minister of International Trade Industry. Any person who is going to engage in processing businesses shall get the particular admission of the Prime Minister. Any person who is going to establish reactors shall get the particular admission of the Prime Minister, The Minister of International Trade and Industry or the Minister of Transportation according to the kinds of specified reactors, respectively. Any person who is going to engage in reprocessing businesses other than the Power Reactor and Nuclear Fuel Development Corporation and the Japan Atomic Energy Research Institute shall get the special designation by the Prime Minister. The employment of nuclear fuel materials and internationally regulated things is defined in detail. (Okada, K.)

  18. Nuclear Reactor Sharing Program

    International Nuclear Information System (INIS)

    1994-01-01

    The Ohio State University Research Reactor (OSURR) is licensed to operate at a maximum power level of 500 kW. A pool-type reactor using flat-plate, low enriched fuel elements, the OSURR provides several experimental facilities including two 6-inch i.d. beam ports, a graphite thermal column, several graphite-isotope-irradiation elements, a pneumatic transfer system (Rabbit), various dry tubes, and a Central Irradiation Facility (CIF). The core arrangement and accessibility facilitates research programs involving material activation or core parameter studies. The OSURR control room is large enough to accommodate laboratory groups which can use control instrumentation for monitoring of experiments. The control instrumentation is relatively simple, without a large amount of duplication. This facilitates opportunities for hands-on experience in reactor operation by nuclear engineering students making reactor parameter measurements. For neutron activation analysis and analyses of natural environmental radioactivity, the NRL maintains the gamma ray spectroscopy system (GRSS). It is comprised of two PC-based 8192-channel multichannel analyzers (MCAs) with all the required software for quantitative analysis. A 3 double-prime x 3 double-prime NaI(Tl), a 14 percent Ge(Li), and a High Purity Germanium detector are currently available for use with the spectroscopy system

  19. 48 CFR 1609.471 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor certification... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Debarment, Suspension, and Ineligibility 1609.471 Contractor certification. All FEHBP carriers and applicant carriers...

  20. 48 CFR 1602.170-4 - Contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  1. Transposed-Letter Priming Effects with Masked Subset Primes: A Re-Examination of the "Relative Position Priming Constraint"

    Science.gov (United States)

    Stinchcombe, Eric J.; Lupker, Stephen J.; Davis, Colin J.

    2012-01-01

    Three experiments are reported investigating the role of letter order in orthographic subset priming (e.g., "grdn"-GARDEN) using both the conventional masked priming technique as well as the sandwich priming technique in a lexical decision task. In all three experiments, subset primes produced priming with the effect being considerably…

  2. 48 CFR 752.7013 - Contractor-mission relationships.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor-mission....7013 Contractor-mission relationships. For use in all USAID contracts involving performance overseas.... Contractor-Mission Relationships (OCT 1989) (a) The Contractor acknowledges that this contract is an...

  3. 30 CFR 45.4 - Independent contractor register.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Independent contractor register. 45.4 Section... ADMINISTRATIVE REQUIREMENTS INDEPENDENT CONTRACTORS § 45.4 Independent contractor register. (a) Each independent contractor shall provide the production-operator in writing the following information: (1) The independent...

  4. 48 CFR 852.237-70 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor....237-70 Contractor responsibilities. As prescribed in 837.110, insert the following clause: Contractor Responsibilities (APR 1984) The contractor shall obtain all necessary licenses and/or permits required to perform...

  5. 48 CFR 1509.170-8 - Contractor Performance Report.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  6. 48 CFR 52.241-5 - Contractor's Facilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Facilities....241-5 Contractor's Facilities. As prescribed in 41.501(c)(4), insert a clause substantially the same as the following: Contractor's Facilities (FEB 1995) (a) The Contractor, at its expense, unless...

  7. 48 CFR 52.247-28 - Contractor's Invoices.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor's Invoices. 52....247-28 Contractor's Invoices. As prescribed in 47.207-9(c), insert the following clause in... services: Contractor's Invoices (APR 1984) The Contractor shall submit itemized invoices as instructed by...

  8. 14 CFR 1245.108 - License to contractor.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false License to contractor. 1245.108 Section... INTELLECTUAL PROPERTY RIGHTS Patent Waiver Regulations § 1245.108 License to contractor. (a) Each contractor.... The license extends to the contractor's domestic subsidiaries and affiliates, if any, within the...

  9. 48 CFR 725.703 - Contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employees. 725... SOCIOECONOMIC PROGRAMS FOREIGN ACQUISITION Source, Origin, and Nationality 725.703 Contractor employees. (a... on employees or consultants of either contractors or subcontractors providing services under an USAID...

  10. 48 CFR 33.207 - Contractor certification.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor certification... CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 33.207 Contractor certification. (a) Contractors shall provide the certification specified in paragraph (c) of this section when...

  11. Decommissioning of the Northrop TRIGA reactor

    International Nuclear Information System (INIS)

    Cozens, George B.; Woo, Harry; Benveniste, Jack; Candall, Walter E.; Adams-Chalmers, Jeanne

    1986-01-01

    An overview of the administrative and operational aspects of decommissioning and dismantling the Northrop Mark F TRIGA Reactor, including: planning and preparation, personnel requirements, government interfacing, costs, contractor negotiations, fuel shipments, demolition, disposal of low level waste, final survey and disposition of the concrete biological shielding. (author)

  12. 48 CFR 1845.502-70 - Contractor-acquired property.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor-acquired... Possession of Contractors 1845.502-70 Contractor-acquired property. All contractor-acquired property must be... contractor-acquired. (2) Submission of DD Form 1419, DOD Industrial Plant Requisition, or equivalent format...

  13. 48 CFR 1252.242-71 - Contractor testimony.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor testimony. 1252... Contractor testimony. As prescribed in (TAR) 48 CFR 1242.7000(b), insert the following clause: Contractor Testimony (OCT 1994) All requests for the testimony of the Contractor or its employees, and any intention to...

  14. 40 CFR 35.6600 - Contractor claims.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Contractor claims. 35.6600 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6600 Contractor claims. (a) General... prepared by the contractor to support a claim against the recipient; and (4) The award official determines...

  15. 29 CFR 500.41 - Farm labor contractor is responsible for actions of his farm labor contractor employee.

    Science.gov (United States)

    2010-07-01

    ..., prior to such employee's engagement in any activity enumerated in section 3(6) of the Act. A farm labor... farm labor contractor employee. 500.41 Section 500.41 Labor Regulations Relating to Labor (Continued... PROTECTION Registration of Farm Labor Contractors and Employees of Farm Labor Contractors Engaged in Farm...

  16. Hanford B Reactor Building Hazard Assessment Report

    International Nuclear Information System (INIS)

    Griffin, P. W.

    1999-01-01

    The 105-B Reactor (hereinafter referred to as B Reactor) is located in the 100 Area of the Hanford Site near Richland, Washington. The B Reactor is one of nine plutonium production reactors that were constructed in the 1940s during the Cold War Era. Construction of the B Reactor began June 7, 1943, and operation began on September 26, 1944. The Environmental Restoration Contractor was requested by RL to provide an assessment/characterization of the B Reactor building to determine and document the hazards that are present and could pose a threat to the environment and/or to individuals touring the building. This report documents the potential hazards, determines the feasibility of mitigating the hazards, and makes recommendations regarding areas where public tour access should not be permitted

  17. Contractor Performance Assessment Reporting System

    Data.gov (United States)

    US Agency for International Development — CPARS is a web-based system used to input data on contractor performance. Reports from the system are used as an aid in awarding contracts to contractors that...

  18. Nuclear reactor built, being built, or planned

    International Nuclear Information System (INIS)

    1991-06-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1990. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE, from the US Nuclear Regulatory Commission, from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations, from US and foreign embassies, and from foreign governmental nuclear departments. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly

  19. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  20. Synthesis of a sugar-organometallic compound 1,1 Prime -difurfurylferrocene and its microwave preparation of carbon/iron oxide nanocomposite

    Energy Technology Data Exchange (ETDEWEB)

    Zhao Shanyu, E-mail: syzhao65@gmail.com [School of Environmental and Safty Engineering, Changzhou University, Changzhou, Jiangsu 213164 (China); Department of Chemistry, Brown University, Providence, RI 02912-9108 (United States); Cooper, Daniel C. [Department of Chemistry, Brown University, Providence, RI 02912-9108 (United States); Xu, Haixun [Institute of Building Materials, Dalian University of Technology, Dalian, Liaoning 116024 (China); Zhu Pinghua [School of Environmental and Safty Engineering, Changzhou University, Changzhou, Jiangsu 213164 (China); Suggs, J. William, E-mail: j_suggs@brown.edu [Department of Chemistry, Brown University, Providence, RI 02912-9108 (United States)

    2013-01-01

    Graphical abstract: In order to synthesize a carbon-metal or metal oxide combination sphere, carbonaceous resource furfural was introduced, which was nucleophilic treated with 1,1 Prime -dilithioferrocene to form a sugar-organometallic compound: ferrocenyl monosaccharide derivative 1,1 Prime -difurfurylferrocene, which can be hydrothermally treated in a microwave reactor to give 300-500 nm microspheres with the {alpha}-Fe{sub 2}O{sub 3} or Fe{sub 3}O{sub 4} formed on the surface, which may be favorable for new magnetic materials preparation or instead of iron with other metal ions, versatile carbon/metal composites will be possibly synthesized for catalysis, drug delivery and magnetic uses. Highlights: Black-Right-Pointing-Pointer We synthesized 1,1 Prime -difurfurylferrocene by nucleophilic treating furfural with 1,1 Prime -dilithioferrocene. Black-Right-Pointing-Pointer 1,1 Prime -Difurfurylferrocene can be hydrothermally treated by microwave to give microspheres with iron oxides on the surface. Black-Right-Pointing-Pointer 1,1 Prime -Difurfurylferrocene has 2 reactive furanose units, which form carbonspheres and ferrocenyl can give iron oxides. Black-Right-Pointing-Pointer REDOX atmosphere influences the coating structures. - Abstract: In order to synthesize a carbon-metal or metal oxide combination sphere, carbonaceous resource furfural 1 was introduced, which was nucleophilic treated with 1,1 Prime -dilithioferrocene 2 to form a sugar-organometallic compound: ferrocenyl monosaccharide derivative 1,1 Prime -difurfurylferrocene 3. 1,1 Prime -Difurfurylferrocene 3 can be hydrothermally treated in a microwave reactor to give 300-500 nm microspheres with the {alpha}-Fe{sub 2}O{sub 3} or Fe{sub 3}O{sub 4} nanocrystals formed on the surface, which may be favorable for new magnetic materials preparation or instead of iron with other metal ions, versatile carbon/metal composites will be possibly synthesized for catalysis, drug delivery and magnetic uses.

  1. Nuclear reactors built, being built, or planned, 1988

    International Nuclear Information System (INIS)

    1989-08-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1988. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington Headquarters and field offices of DOE, from the US Nuclear Regulatory Commission, from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations, from US and foreign embassies, and from foreign governmental nuclear departments. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables. Section 2 includes nuclear reactors that are operating, being built, or planned. Section 3 includes reactors that have been shut down permanently or dismantled

  2. As prime minister during the Fukushima crisis

    International Nuclear Information System (INIS)

    Kan, Naoto

    2015-01-01

    Naoto Kan was the acting Japanese Prime Minister during the Tohoku earthquake and the resulting Fukushima reactor accident. After demission in September 2011 he decided to document the facts according to his knowledge and the memorized thoughts during the course of the accident, his decision making and his own emotions. The first chapter covers the daily documentation until March 19th, the second chapter deals with nuclear power phaseout and Kan's demission, the third chapter covers the issues nuclear power phaseout - politics - citizens.

  3. Hydrogen Contractors Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Fitzsimmons, Tim [Dept. of Energy (DOE), Washington DC (United States). Office of Basic Energy Sciences. Division of Materials Sciences and Engineering

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  4. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational

  5. The Prime Numbers Hidden Symmetric Structure and its Relation to the Twin Prime Infinitude and an Improved Prime Number Theorem

    CERN Document Server

    Mikoss, I

    2006-01-01

    Due to the sieving process represented by a Secondary Sieving Map; during the generation of the prime numbers, geometric structures with definite symmetries are formed which become evident through their geometrical representations. The study of these structures allows the development of a constructive prime generating formula. This defines a mean prime density yielding a second order recursive and discrete prime producing formula and a second order differential equation whose solutions produce an improved Prime Number Theorem. Applying these results to twin prime pairs is possible to generate a Twin Prime Number Theorem and important conclusions about the infinitude of the twin primes.

  6. Inertial fusion reactor designs

    International Nuclear Information System (INIS)

    Meier, W.

    1987-01-01

    In this paper, a variety of reactor concepts are proposed. One of the prime concerns is dealing with the x-rays and debris that are emitted by the target. Internal neutron shielding can reduce radiation damage and activation, leading to longer life systems, reduced activation and fewer safety concerns. There is really no consensus on what the best reactor concept is at this point. There has been virtually no chamber technology development to date. This is the flip side of the coin of the separability of the target physics and the reactor design. Since reactor technology has not been required to do target experiments, it's not being developed. Economic analysis of conceptual designs indicates that ICF can be economically competitive with magnetic fusion, fission and fossil plants

  7. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or having...

  8. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  9. 48 CFR 52.204-7 - Central Contractor Registration.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Central Contractor....204-7 Central Contractor Registration. As prescribed in 4.1105, use the following clause: Central Contractor Registration (APR 2008) (a) Definitions. As used in this clause— Central Contractor Registration...

  10. Environmental liability and the independent contractor

    International Nuclear Information System (INIS)

    Gilmour, B.S.

    1999-01-01

    The provisions of the Environmental Protection and Enhancement Act (EPEA) regarding the relationship between a company and an independent contractor were reviewed. The EPEA was introduced in September 1993 and significantly altered the environmental laws in the province of Alberta. The provisions of the EPEA that apply to the petroleum industry are conservation and reclamation as well as provisions concerning release of substances, contaminated sites and penalties. Companies that pollute may be held liable for reclamation, even if the work was carried out by an independent contractor and despite the fact that the independent contractor is not an employee of the company. Under the current EPEA laws, companies may not be able to effectively shift responsibility for environmental liabilities to independent contractors even where the contractor was negligent. This paper presented suggestions regarding contractor agreements and due diligence to help minimize the risk of liability to companies. The paper also discussed the following two types of liabilities under the EPEA's harmful substances section: (1) the obligation to clean up an affected area, and (2) fines and penalties that may be imposed when an offence is committed

  11. Operational readiness reviews for restart of L reactor

    International Nuclear Information System (INIS)

    Finley, R.H.

    1984-01-01

    The L Reactor at the Savannah River Plant is being restarted after being in a standby status since 1968. Operational Readiness Reviews (ORRs) were conducted by DOE-SR and contractor personnel concurrent with the restart activity. This paper summarizes the ORR activity

  12. 48 CFR 1552.237-76 - Government-Contractor Relations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Government-Contractor... 1552.237-76 Government-Contractor Relations. As prescribed in 1537.110(g), insert the following clause: Government-Contractor Relations (JUN 1999) (a) The Government and the Contractor understand and agree that...

  13. The law for the regulations of nuclear source materials, nuclear fuel materials and reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The law aims to perform regulations on enterprises of refining, processing and reprocessing of nuclear source and fuel materials and on establishment and operation of reactors to realize the peaceful and deliberate utilization of atomic energy according to the principle of the atomic energy basic law. Regulations of use of internationally regulated substances are also envisaged to observe international agreements. Basic concepts and terms are defined, such as: atomic energy; nuclear fuel material; nuclear source material; reactor; refining; processing; reprocessing and internationally regulated substance. Any person besides the Power Reactor and Nuclear Fuel Material Developing Corporation who undertakes refining shall be designated by the Prime Minister and the Minister of International Trade and Industry. An application shall be filed to the ministers concerned, listing name and address of the person, name and location of the refining works, equipment and method of refining, etc. The permission of the Prime Minister is necessary for any person who engages in processing. An application shall be filed to the Prime Minister, listing name and address of the person, name and location of the processing works and equipment and method of processing, etc. Permission of the Prime Minister, the Minister of International Trade and Industry or the Minister of Transport is necessary for any person who sets up reactors. An application shall be filed to the minister concerned, listing name and address of the person, purpose of operation, style, thermal output of reactor and number of units, etc. (Okada, K.)

  14. 40 CFR 68.87 - Contractors.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.87 Contractors. (a) Application. This... specialty work on or adjacent to a covered process. It does not apply to contractors providing incidental...

  15. 78 FR 11164 - Policy on Contractor Profits

    Science.gov (United States)

    2013-02-15

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System Policy on Contractor Profits AGENCY... Authorization Act for Fiscal Year 2013. Section 804, Department of Defense Policy on Contractor Profits... modifications to such guidelines that are necessary to ensure an appropriate link between contractor profit and...

  16. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  17. 48 CFR 970.5203-3 - Contractor's organization.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  18. 48 CFR 450.303-1 - Contractor requests.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  19. The control of reactor outages

    International Nuclear Information System (INIS)

    Bouget, Y.H.; Berteloot, J.M.

    1995-01-01

    The 1985-1992 period was marked by a continuous decay in French reactors operation. This situation has led the Committee for Outages Mastery to take steps for the improvement of nuclear power plants availability. The control of reactor outages requires an integrated vision of the safety, duration, dosimetry, costs and security aspects and a perfect management of contractors. The paper describes the methodology used for the management and the maintenance of the French PWR reactors stock. A detailed schedule of maintenance tasks with dose estimations is now required from each site to anticipate and optimize the duration of outages. Thanks to this action, a significant reduction of the maintenance costs is observed for the 1992-1995 period. (J.S.). 2 figs

  20. Administrative Aspects of the Criticality Controls Used in Programmes for Basic Criticality Research, Reactor Development and Materials Processing

    Energy Technology Data Exchange (ETDEWEB)

    Wood, D. P.; Giessing, D. F. [Operational Safety Division, USAEC Albuquerque Operations Office, NM (United States)

    1966-05-15

    This paper describes the administrative and procedural aspects of criticality controls used by a field office of the United States Atomic Energy Commission in programmes that include reactor criticals, research and materials testing reactors, and power reactor development. Situations encountered include handling, storing, and processing large quantities of uranium-235 and plutonium-239 of various configurations and compositions in laboratories and operations which gather basic criticality data, processing of fissile material, and varied reactor research and development, programmes including fuel materials. Similar situations exist for uranium-233 and plutonium-238 on a smaller laboratory scale. The administrative controls and interactions of the USAEC field office and the operating contractors, who operate these installations for the USAEC, are outlined. Also, the purpose and scope of the direct examination by USAEC personnel of these contractor facilities are analysed. The programme has been in effect for three years and is believed to be successful in maintaining efficient operations and an acceptable low level of risk of inadvertent criticality. Success of this programme is in good measure due to the close working relationship between the staffs of the USAEC field office and the operating contractors. (author)

  1. 48 CFR 2427.305-2 - Follow-up by contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Follow-up by contractor....305-2 Follow-up by contractor. (b) Contractor reports. Contractors shall complete and submit to the... Contracting Officer shall send the form to those contractors whose contract work may have required the...

  2. Priming semantico e museografia / Semantic priming and museography

    Directory of Open Access Journals (Sweden)

    Annalisa Banzi

    2012-05-01

    Full Text Available Il priming è una tipologia di memoria implicita che facilita l’apprendimento di stimoli di diversa natura (stimoli visivi, semantici, etc.. Un allestimento museale che adotti strumenti basati sul priming potrebbe aiutare il pubblico a selezionare i contenuti relativi agli oggetti esposti. In questo articolo viene descritta l’applicazione del priming semantico allo spazio museale. Questa operazione in prima battutta potrebbe essere letta come una mancanza di fiducia nelle capacità cognitive del visitatore nel discriminare il significato delle informazioni. In realtà è una forma di sostegno per aiutare il visitatore a sviluppare gradualmente una propria metodologia di approccio ai contenuti proposti nel museo. Grazie al priming, il pubblico riceve una serie di stimoli che possono aiutare a costituire la base delle proprie conoscenze in ambito storico-artistico ed essere il punto di partenza sul quale costruire un metodo critico.   Many psychological aspects such as motivation, emotion, and attention, affect human learning. Among these, priming triggers and tunes implicit memory processes. Hence the goal of this paper is to check whether semantic priming can be used as an effective tool to design a supportive museum environment where people can easily learn. Moreover, the resulting stronger and more persistent memories could encourage museum visitors to learn more and better, and to develop a method to “read” the artworks. After a brief overview of current models of semantic priming, practical and theoretical issues are considered and discussed.

  3. Licensing of advanced reactors: Status report and perspective

    International Nuclear Information System (INIS)

    King, T.

    1988-01-01

    In July, 1986, the U.S. Nuclear Regulatory Commission issued a Policy State on the Regulation of Advanced Nuclear Power Plants. As part of this policy, advanced reactor designers were encouraged to interact with NRC [Nuclear Regulatory Commission] early in the design process to obtain feedback regarding licensing requirements for advanced reactors. Accordingly, the staff has been interacting with the Department of Energy (DOE) and its contractors on the review of three advanced reactor conceptual designs: one modular high temperature gas-cooled reactor (MHTGR) and two liquid metal reactors (LMRs). This paper provides a status of the NRC review effort, describes the key policy and technical issues resulting from our review and provides the current status and approach to the development of licensing guidance on each

  4. 32 CFR 989.23 - Contractor prepared documents.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Contractor prepared documents. 989.23 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.23 Contractor prepared documents. All Air Force... should reflect on the cover sheet they are an Air Force document. Contractor preparation information...

  5. 6 CFR 25.8 - Government contractor Defense.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Government contractor Defense. 25.8 Section 25.8...-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.8 Government contractor Defense. (a) Criteria for... applicability of the government contractor defense. In determining whether to issue such Certification, the...

  6. Nuclear reactors built, being built, or planned 1992

    International Nuclear Information System (INIS)

    1993-07-01

    Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1992. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. Information is presented on five parts: Civilian, Production, Military, Export and Critical Assembly

  7. 42 CFR 455.202 - Limitation on contractor liability.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Limitation on contractor liability. 455.202 Section... § 455.202 Limitation on contractor liability. (a) A program contractor, a person, or an entity employed... contractor will not be held to have violated any criminal law and will not be held liable in any civil action...

  8. Space reactors - past, present, and future

    International Nuclear Information System (INIS)

    Buden, D.; Angelo, J.

    1983-01-01

    In the 1990s and beyond, advanced-design nuclear reactors could represent the prime source of both space power and propulsion. Many sophisticated military and civilian space missions of the future will require first kilowatt and then megawatt levels of power. This paper reviews key technology developments that accompanied past US space nuclear power development efforts, describes on-going programs, and then explores reactor technologies that will satisfy megawatt power level needs and beyond

  9. Smelly primes – when olfactory primes do or do not work

    Directory of Open Access Journals (Sweden)

    Monique A Smeets

    2014-02-01

    Full Text Available In applied olfactory cognition the effects that olfactory stimulation can have on (human behavior are investigated. To enable an efficient application of olfactory stimuli a model of how they may lead to a change in behavior is proposed. To this end we use the concept of olfactory priming. Olfactory priming may prompt a special view on priming as the olfactory sense has some unique properties which make odors special types of primes. Examples of such properties are the ability of odors to influence our behavior outside of awareness, to lead to strong affective evaluations, to evoke specific memories, and to associate easily and quickly to other environmental stimuli. Opportunities and limitations for using odors as primes are related to these properties, and alternative explanations for reported findings are offered. Implications for olfactory semantic, construal, behavior and goal priming are given based on a brief overview of the priming literature from social psychology and from olfactory perception science. We end by formulating recommendations and ideas for a future research agenda and applications for olfactory priming.

  10. Restart of K-Reactor, Savannah River Site: Safety evaluation report

    Energy Technology Data Exchange (ETDEWEB)

    1991-04-01

    This Safety Evaluation Report (SER) focuses on those issues required to support the restart of the K-Reactor at the Savannah River Plant. This SER provides the safety criteria for restart and documents the results of the staff reviews of the DOE and operating contractor activities to meet these criteria. To develop the restart criteria for the issues discussed in this SER, the Savannah River Restart Office and Savannah River Special Projects Office staffs relied, when possible, on commercial industry codes and standards and on NRC requirements and guidelines for the commercial nuclear industry. However, because of the age and uniqueness of the Savannah River reactors, criteria for the commercial plants were not always applicable. In these cases, alternate criteria were developed. The restart criteria applicable to each of the issues are identified in the safety evaluations for each issue. The restart criteria identified in this report are intended to apply only to restart of the Savannah River reactors. Following the development of the acceptance criteria, the DOE staff and their support contractors evaluated the results of the DOE and operating contractor (WSRC) activities to meet these criteria. The results of those evaluations are documented in this report. Deviations or failures to meet the requirements are either justified in the report or carried as open or confirmatory items to be completed and evaluated in supplements to this report before restart. 62 refs., 1 fig.

  11. Restart of K-Reactor, Savannah River Site: Safety evaluation report

    International Nuclear Information System (INIS)

    1991-04-01

    This Safety Evaluation Report (SER) focuses on those issues required to support the restart of the K-Reactor at the Savannah River Plant. This SER provides the safety criteria for restart and documents the results of the staff reviews of the DOE and operating contractor activities to meet these criteria. To develop the restart criteria for the issues discussed in this SER, the Savannah River Restart Office and Savannah River Special Projects Office staffs relied, when possible, on commercial industry codes and standards and on NRC requirements and guidelines for the commercial nuclear industry. However, because of the age and uniqueness of the Savannah River reactors, criteria for the commercial plants were not always applicable. In these cases, alternate criteria were developed. The restart criteria applicable to each of the issues are identified in the safety evaluations for each issue. The restart criteria identified in this report are intended to apply only to restart of the Savannah River reactors. Following the development of the acceptance criteria, the DOE staff and their support contractors evaluated the results of the DOE and operating contractor (WSRC) activities to meet these criteria. The results of those evaluations are documented in this report. Deviations or failures to meet the requirements are either justified in the report or carried as open or confirmatory items to be completed and evaluated in supplements to this report before restart. 62 refs., 1 fig

  12. Nuclear reactors built, being built, or planned: 1987

    International Nuclear Information System (INIS)

    1988-06-01

    Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1987. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually for Washington headquarters and field offices of DOE; from the US Nuclear regulatory Commission; from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. The major change in this revision involves the data related to shutdown and dismantled facilities. Because this information serves substantially different purposes, it has been accumulated in a separate section, ''Reactors and Facilities Shutdown or Dismantled.'' Cancelled reactors or reactors whose progress has been terminated at some stage before operation are included in this section

  13. Investigation of the delay in pressure vessel embrittlement specimen analysis for the Oak Ridge National Laboratory High Flux Isotope Reactor

    International Nuclear Information System (INIS)

    Rothrock, J.D.; Hoffman, E.E.; Manthey, G.C.; Sheffey, D.W.

    1987-01-01

    Analysis of the investigative data pertaining to this incident reveals the following conditions as key findings and probable causes: (1) The contractor failed to properly implement the surveillance program for monitoring reactor pressure vessel embrittlement. (2) Contractor and DOE organizations provided less than adequate oversight and independent overview, especially by not requiring operating organizations to provide documented evidence to substantiate claims that there was ''no problem'' with respect to embrittlement. (3) Although the temperature limitation for reactor pressurization identified in the Technical Specifications was never violated, the basis of this safety limitation was violated. (4) The basis for concluding that there would be no embrittlement of the pressure vessel steel over the expected life of the reactor is questionable. (5) The contractor and DOE failed to make the surveillance program visible by incorporating it in the Technical Specifications. (6) The Accident Analysis/Final Safety Analysis Report was never adequately reviewed and updated subsequent to its initial issuance. (7) Surveillance specimen analysis was incomplete and never transmitted to reactor operating personnel in a usable format prior to November 1986. (8) There was extensive delays (many years) in the testing, analysis, and reporting of surveillance program results

  14. Military Contractors - Too Much Dependence

    National Research Council Canada - National Science Library

    Hill, Nathan E

    2008-01-01

    .... There is undoubtedly a need for military contractors and there are numerous positive arguments in their favor. However, the negative arguments have not been highlighted enough recently and the scales are now out of balance. The intent of this research paper is to encourage the U.S. military to rebalance the scales and curb the over-reliance on contractors.

  15. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  16. Quality assurance: an independent safety assessment of Department of Energy nuclear reactor facilities

    International Nuclear Information System (INIS)

    Frankhouser, W.L.; Bass, W. Jr.; Langston, M.E.

    1981-02-01

    This report presents the assessments of QA programs at eight DOE reactor sites as performed by three members of the NFPQT Support Team. A summation of assessments is presented. That summation includes discussion of findings and recommendations for follow-on actions. The detailed record of contractor-by-contractor reviews is provided. A discussion of the approach in performing the QA assessments is presented, and the basis and limitations of the assessments are discussed

  17. 48 CFR 952.251-70 - Contractor employee travel discounts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor employee travel... Contractor employee travel discounts. As prescribed in 951.7002, insert the following clause: Contractor Employee Travel Discounts (AUG 2009) (a) The Contractor shall take advantage of travel discounts offered to...

  18. 48 CFR 245.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Screening of contractor inventory. 245.608 Section 245.608 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Disposal of Contractor Inventory 245.608 Screening of contractor inventory. ...

  19. 48 CFR 1553.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor qualifications. 1553.209 Section 1553.209 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209 Contractor qualifications. ...

  20. Nuclear reactors built, being built, or planned in the United States

    International Nuclear Information System (INIS)

    Goulden, A.M.

    1983-08-01

    This semiannual compilation provides current information about facilities for domestic use or export which are capable of sustaining a nuclear chain reaction. Civilian, production, and military reactors are listed, as are reactors for export and critical assembly facilities. Information given includes location, owner, principal nuclear contractor, type, power rating, docket number, and start-up and shutdown dates. Nuclear Reactors Built, Being Built, or Planned is also available on standing order (PB83-903000) through a deposit account with the National Technical Information Service, Springfield, VA 22161

  1. Stacking faults of {gamma}{prime}{prime} phase precipitated in a Ni-15Cr-8Fe-6Nb alloy; Ni-15Cr-8Fe-6Nb gokin ni sekishutsusuru {gamma}{prime}{prime} sonai no sekiso kekkan

    Energy Technology Data Exchange (ETDEWEB)

    Kusabiraki, K; Ikeuchi, S [Toyama University, Toyama (Japan). Faculty of Engineering

    1995-09-01

    The stacking faults of a metastable {gamma}{prime}{prime} phase precipitated in a nickel-base superalloy, a modified NCF 3 type alloy (X-750M) were investigated by transmission electron microscopy and X-ray diffraction method. The {gamma}{prime}{prime} precipitates are circular shaped plates at the early stage of aging and they become elliptic or irregular shaped plates at the latter stage of aging up to 1033K. Contrast which suggests the existence of stacking faults on {l_brace}112{r_brace}{sub {gamma}{prime}{prime}} planes can be seen in many of large {gamma}{prime}{prime} precipitates extracted from the specimens aged at 1033K. It is clear that the values of {gamma}{prime}{prime}/{gamma} lattice mismatch increase with increasing the aging time from the measurement of lattice constants of the {gamma} and the {gamma}{prime}{prime} phase. The formation of stacking faults on {l_brace}112{r_brace}{sub {gamma}{prime}{prime}} in the large {gamma}{prime}{prime} precipitates is due to the movement of an a/6 [111] partial dislocation introduced by {gamma}{prime}{prime} /{gamma} coherency strain. Since a part of stacking sequence has a similar crystal structure to that of a stable {delta} phase precipitates in {gamma} phase, the formation of stacking faults in the {gamma}{prime}{prime} precipitates is considered to be favorable for the stabilization of them. 14 refs., 10 figs., 1 tab.

  2. 48 CFR 1852.209-72 - Composition of the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 1852.209-72 Section 1852.209-72 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND... and Clauses 1852.209-72 Composition of the contractor. As prescribed in 1809.670, insert the following clause: Composition of the Contractor (DEC 1988) If the Contractor is comprised of more than one legal...

  3. Nuclear reactors built, being built, or planned: 1989

    International Nuclear Information System (INIS)

    1990-06-01

    Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1989. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE, from the US Nuclear Regulatory Commission, from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations, from US and foreign embassies, and from foreign governmental nuclear departments. Information is presented in five parts, each of which is categorized by primary function or purpose: civilian, production, military, export, and critical assembly facilities

  4. 48 CFR 53.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor qualifications. 53.209 Section 53.209 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.209 Contractor qualifications. ...

  5. 48 CFR 2936.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor... Construction 2936.201 Evaluation of contractor performance. The HCA must establish procedures to evaluate construction contractor performance and prepare performance reports as required by FAR 36.201. ...

  6. 48 CFR 1552.209-76 - Contractor performance evaluations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor performance... 1552.209-76 Contractor performance evaluations. As prescribed in section 1509.170-1, insert the following clause in all applicable solicitations and contracts. Contractor Performance Evaluations (OCT 2002...

  7. 48 CFR 8.406-7 - Contractor Performance Evaluation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor Performance... ACQUISITION PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 8.406-7 Contractor Performance Evaluation. Ordering activities must prepare an evaluation of contractor performance for each...

  8. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 3, (Anderson, Indiana-Winona, Mississippi).

    Science.gov (United States)

    1984-01-01

    FORMING COMPANY 33 33 BONNER SPRINGS STEPHEN R E INC 95 95 BURLINGTON BRECKCO CONSTRUCTION CO INC 430 430 CHANUTE PORTER H K COMPANY INC 1,792 364 1,428...SEP) PAGE 848 MASS (DOLLARS IN THOUSANDS) LOCATION CONTRACTOR DOD AIR NAME NAME TOTAL ARMY NAVY FORCE DLA OCE ODA RANDOLPH MC GRAW -EDISON COMPANY 45...221 221 GENERAL DYNAMICS CORPORATION 2,127- 2,127- GENERAL DYNAMICS LAND SYS 12,866 12,866 MC DONNELL DOUGLAS CORPORATION 3,549 1,022 2.527 NC GRAW

  9. 48 CFR 32.909 - Contractor inquiries.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inquiries. 32.909 Section 32.909 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 32.909 Contractor inquiries. (a) Direct questions...

  10. National Radon Contractor Proficiency Program. Proficiency report: Supplement

    International Nuclear Information System (INIS)

    1991-02-01

    The report, a supplement to the RCP Proficiency Report, will further assist governmental officials in providing advice to the public on the selection of proficient radon mitigation contractors. These reports list 1,123 contractors who have met the requirements of the RCP Program as of December 15, 1990. The Proficiency Report provides information on each contractor's name, RCP identification number, company name, address, phone number, and geographic service area. The report provides two additional tables, indexed by company name and by RCP identification number. The report is intended to help users quickly identify a proficient contractor if only the company name is known, or to verify which contractor is associated with a particular ID number

  11. Contractor Software Charges

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... Examples of computer software costs that contractors charge through indirect rates are material management systems, security systems, labor accounting systems, and computer-aided design and manufacturing...

  12. Nuclear Reactors and Technology; (USA)

    Energy Technology Data Exchange (ETDEWEB)

    Cason, D.L.; Hicks, S.C. (eds.)

    1991-01-01

    Nuclear Reactors and Technology (NRT) announces on a monthly basis the current worldwide information available from the open literature on nuclear reactors and technology, including all aspects of power reactors, components and accessories, fuel elements, control systems, and materials. This publication contains the abstracts of DOE reports, journal articles, conference papers, patents, theses, and monographs added to the Energy Science and Technology Database (EDB) during the past month. Also included are US information obtained through acquisition programs or interagency agreements and international information obtained through the International Energy Agency's Energy Technology Data Exchange or government-to-government agreements. The digests in NRT and other citations to information on nuclear reactors back to 1948 are available for online searching and retrieval on EDB and Nuclear Science Abstracts (NSA) database. Current information, added daily to EDB, is available to DOE and its contractors through the DOE integrated Technical Information System. Customized profiles can be developed to provide current information to meet each user's needs.

  13. 48 CFR 2452.251-70 - Contractor employee travel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor employee travel... 2452.251-70 Contractor employee travel. As prescribed in 2451.7001, insert the following clause in all cost-reimbursement solicitations and contracts involving travel: Contractor Employee Travel (OCT 1999...

  14. 48 CFR 3036.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Evaluation of contractor performance. 3036.201 Section 3036.201 Federal Acquisition Regulations System DEPARTMENT OF HOMELAND SECURITY... contractor performance. (a)(2) Performance reports shall be prepared and entered into the Contractor...

  15. 48 CFR 2152.215-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... PRECONTRACT PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 2152.215-70 Contractor records retention. As prescribed in 2115.071, insert the following clause: Contractor Records Retention (OCT 2005...

  16. 48 CFR 36.506 - Superintendence by the contractor.

    Science.gov (United States)

    2010-10-01

    ... contractor. 36.506 Section 36.506 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Superintendence by the contractor. The contracting officer shall insert the clause at 52.236-6, Superintendence by the Contractor, in solicitations and contracts when a fixed-price construction contract or a fixed...

  17. 48 CFR 1652.204-70 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor records... of FEHBP Clauses 1652.204-70 Contractor records retention. As prescribed in 1604.705 the following clause will be inserted in all FEHB Program contracts. Contractor Records Retention (JUL 2005...

  18. 48 CFR 4.102 - Contractor's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor's signature. 4.102 Section 4.102 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.102 Contractor's signature. (a) Individuals. A contract with an...

  19. 48 CFR 253.209 - Contractor qualifications.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contractor qualifications. 253.209 Section 253.209 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CLAUSES AND FORMS FORMS Prescription of Forms 253.209 Contractor qualifications. ...

  20. Nuclear reactors built, being built, or planned, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, B.

    1992-07-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1991. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is an American company -- working either independently or in cooperation with a foreign company (Part 4, in each section). Critical assembly refers to an assembly of fuel and assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5).

  1. Nuclear reactors built, being built, or planned, 1991

    International Nuclear Information System (INIS)

    Simpson, B.

    1992-07-01

    This document contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1991. The book is divided into three major sections: Section 1 consists of a reactor locator map and reactor tables; Section 2 includes nuclear reactors that are operating, being built, or planned; and Section 3 includes reactors that have been shut down permanently or dismantled. Sections 2 and 3 contain the following classification of reactors: Civilian, Production, Military, Export, and Critical Assembly. Export reactor refers to a reactor for which the principal nuclear contractor is an American company -- working either independently or in cooperation with a foreign company (Part 4, in each section). Critical assembly refers to an assembly of fuel and assembly of fuel and moderator that requires an external source of neutrons to initiate and maintain fission. A critical assembly is used for experimental measurements (Part 5)

  2. 30 CFR 875.20 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  3. 30 CFR 874.16 - Contractor eligibility.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  4. 7 CFR 3015.183 - Access to contractor records.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Access to contractor records. 3015.183 Section 3015... contractor records. The Attachment 0 requires recipients to include in specified kinds of contracts a provision for access to the contractor's records by the recipient and the Federal government. The following...

  5. Nuclear reactors built, being built, or planned 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    This publication contains unclassified information about facilities, built, being built, or planned in the United States for domestic use or export as of December 31, 1996. The Office of Scientific and Technical Information, U.S. Department of Energy, gathers this information annually from Washington headquarters, and field offices of DOE; from the U.S. Nuclear Regulatory Commission (NRC); from the U. S. reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from U.S. and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables of the characteristic and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled.

  6. Nuclear reactors built, being built, or planned: 1996

    International Nuclear Information System (INIS)

    1997-08-01

    This publication contains unclassified information about facilities, built, being built, or planned in the United States for domestic use or export as of December 31, 1996. The Office of Scientific and Technical Information, U.S. Department of Energy, gathers this information annually from Washington headquarters, and field offices of DOE; from the U.S. Nuclear Regulatory Commission (NRC); from the U. S. reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from U.S. and foreign embassies; and from foreign governmental nuclear departments. The book consists of three divisions, as follows: (1) a commercial reactor locator map and tables of the characteristic and statistical data that follow; a table of abbreviations; (2) tables of data for reactors operating, being built, or planned; and (3) tables of data for reactors that have been shut down permanently or dismantled

  7. 48 CFR 3052.204-71 - Contractor employee access.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contractor employee access... CLAUSES Text of Provisions and Clauses 3052.204-71 Contractor employee access. As prescribed in (HSAR) 48...: Contractor Employee Access (JUN 2006) (a) “Sensitive Information,” as used in this Chapter, means any...

  8. Prime tight frames

    DEFF Research Database (Denmark)

    Lemvig, Jakob; Miller, Christopher; Okoudjou, Kasso A.

    2014-01-01

    to suggest effective analysis and synthesis computation strategies for such frames. Finally, we describe all prime frames constructed from the spectral tetris method, and, as a byproduct, we obtain a characterization of when the spectral tetris construction works for redundancies below two.......We introduce a class of finite tight frames called prime tight frames and prove some of their elementary properties. In particular, we show that any finite tight frame can be written as a union of prime tight frames. We then characterize all prime harmonic tight frames and use thischaracterization...

  9. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 4 (Washington, D.C.-Lafayette, Indiana).

    Science.gov (United States)

    1983-01-01

    CONTRACTOR TOTAL 3 172 ROOAN CONSTRUCTION CO NCMACDILL AFB FLORIDA 033040 2140 10 3 B OTAIG 0157 FO6SO2-! ps4 -CO022 D C E 5 2 2 Z127 002ELCRNIC...DESCRIPTION OF CMDTY/SRVC 2 3 4 5 6 1717 8 9 A 0 1 3 24 $S$SSS(000) ELECTRO MOTIVE INC LA GRANGE ILLINOIS 029204 4720 14 4 J 00700 0007 DLA700-73-90522 B C A 1

  10. Relationship between self-priming and hydraulic behavior in Venturi Scrubber

    International Nuclear Information System (INIS)

    Horiguchi, Naoki; Kaneko, Akiko; Abe, Yutaka; Yoshida, Hiroyuki

    2014-01-01

    As revealed by Fukushima Daiichi nuclear disaster, countermeasures against severe accident in nuclear power plants are an urgent need. In particular, from the viewpoint of protecting a containment and suppressing the diffusion of radioactive materials, it is important to develop the device which allows a filtered venting of contaminated high pressure gas. In the filtered venting system that used in European reactors, so called Multi Venturi Scrubbers System is used to realize filtered venting without any power supply (Lindau, 1988) (Rust, et al., 1995). The system operates with any power supply and high pressure gas filled in the containment. This system is able to define to be composed of Venturi Scrubbers (VS) and a bubble column. In the VS, scrubbing of contaminated gas is promoted by both gas releases through a submerged VS and gas-liquid contact with splay flow formed by liquid suctioned through a hole provided by the pressure difference between inner and outer parts of a throat part of the VS. This type of the VS is called self-priming ones. However, the scrubbing mechanism of the self-priming VS including effects of gas mass flow rate and shape of the VS are understood insufficiently in the previous studies. In this study, to understand the VS operation characteristics for the filtered venting, we discussed the mechanisms of the self-priming phenomena and the hydraulic behavior in the VS. In this paper, we conducted a visualized observation of the hydraulic behavior in the VS and measured liquid flow rate of the self-priming. As a result, it is shown that there is the possibility that the VS decontamination performance falls low level with no self-priming. (author)

  11. Determinants of contractor pricing strategy

    OpenAIRE

    Moses, O. Douglas

    1988-01-01

    This paper investigates pricing strategies used by major defense contractors. Two pricing strategies are identified and discussed: penetration, which calls for a relatively low initial price followed by little reduction in price over time, and skimming, which calls for a relatively high initial price coupled with greater reduction in price over time. It is argued that contractor pricing strategy will depend on features of the defense program under consideration and featur...

  12. Non-cognate translation priming in masked priming lexical decision experiments: A meta-analysis.

    Science.gov (United States)

    Wen, Yun; van Heuven, Walter J B

    2017-06-01

    The masked translation priming paradigm has been widely used in the last 25 years to investigate word processing in bilinguals. Motivated by studies reporting mixed findings, in particular for second language (L2) to first language (L1) translation priming, we conducted, for the first time in the literature, a meta-analysis of 64 masked priming lexical decision experiments across 24 studies to assess the effect sizes of L1-L2 and L2-L1 non-cognate translation priming effects in bilinguals. Our meta-analysis also investigated the influence of potential moderators of translation priming effects. The results provided clear evidence of significant translation priming effects for both directions, with L1-L2 translation priming significantly larger than L2-L1 translation priming (i.e., effect size of 0.86 vs. 0.31). The analyses also revealed that L1-L2 translation effect sizes were moderated by the interval between prime and target (ISI), whereas L2-L1 translation effect sizes were modulated by the number of items per cell. Theoretical and methodological implications of this meta-analysis are discussed and recommendations for future studies are provided.

  13. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Catton, C.

    1998-01-01

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  14. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  15. Nuclear reactors built, being built, or planned: 1986

    International Nuclear Information System (INIS)

    Carter, E.P.

    1987-03-01

    Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1986, which are capable of sustaining a nuclear chain reaction. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE; from the US Nuclear Regulatory Commisssion; from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; and from US embassies of foreign countries. Information is presented in five parts, each of which is categorized by primary function or purpose: civilian, production, military, export, and critical assembly facilities

  16. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor... instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting...

  17. 78 FR 46783 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2013-08-01

    ..., Sequence 1] RIN 9000-AM09 Federal Acquisition Regulation; Documenting Contractor Performance AGENCY... the Contractor Performance Assessment Reporting System (CPARS), the single Governmentwide past... Procurement Policy (OFPP) memorandum entitled ``Improving the Use of Contractor Performance Information...

  18. Private Security Contractors in Darfur

    DEFF Research Database (Denmark)

    Leander, Anna

    2006-01-01

    This article argues that the role of Private Security Contractors in Darfur reflects and reinforces neo-liberal governmentality in contemporary security governance. It is an argument (in line with other articles in this special issue) which is more interested in discussing how the privatization....... It underlines that governance is increasingly taking place through a set of (quasi-) markets, it is marked by entrepreneurial values, and a hands off approach to governance. We then discuss the way this overall change is reflected in and reinforced by the role of private security contractors in Darfur. Drawing...... at these processes is necessary to understand the role of private security contractors in Darfur. But more than this, practices in Darfur entrench neo-liberal governmentality in security more generally. The managerial and `de-politicizing' approach to security in Darfur displaces alternative views not only...

  19. 76 FR 37704 - Federal Acquisition Regulation; Documenting Contractor Performance

    Science.gov (United States)

    2011-06-28

    ... Federal Acquisition Regulation; Documenting Contractor Performance AGENCY: Department of Defense (DoD..., and to require all past performance information be entered into the Contractor Performance Assessment... Contractor Performance Information. These changes provide Governmentwide standardized evaluation factors and...

  20. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  1. A guide for heating contractor; Opas laempoeyrittaejaelle

    Energy Technology Data Exchange (ETDEWEB)

    Solmio, H; Tuomi, S; Valkonen, J

    1996-12-31

    Heating contractor is eg. a forest owner, who is responsible for the heating of a commune owned school using firewood purchased from the contractor`s own forests. This is a new alternative for entrepreneurship in the countryside. This guide has been meant as an aid for persons starting heating contraction. It is supposed to be of importance for the designers of the communal energy supply, for advisors and instructors, as well as for those already started the heating contraction. The guide discusses the following topics: Why to became a heating contractor; The ways of heating contraction; operational requirements; Contracts; Conversion of a boiler plant to wood fuels; Fuel purchase; Heating work; Profitably estimation; Examples of operational solutions. The guide also includes as an example a draft contract for heating contraction

  2. National Radon Contractor Proficiency Program. Proficiency report, October 1990

    International Nuclear Information System (INIS)

    1990-10-01

    The report lists those individual contractors in the United States who have met the requirements of the Radon Contractor Proficiency (RCP) Program as of August 18, 1990. These requirements are designed to provide minimum proficiency criteria for individuals who design and supervise the installation of radon mitigation systems in buildings. (Some States have more stringent requirements as part of their radon certification programs. The States should be consulted directly for details on their programs; see Section 5 for a list of State radon contacts). The RCP Program measures the proficiency of an individual contractor, not their company. Therefore, users of the report who select a mitigation firm should ensure that the services are provided by the listed contractor. The National RCP Program does not accredit mitigation contractors, nor does it certify, recommend, or endorse participating companies. Only the listed contractor, not their company of affilation, are deemed proficient. The inclusion of a contractor in the report should not be interpreted as a certification or accreditation of the individual or affiliated company

  3. Australia's new nuclear reactor

    International Nuclear Information System (INIS)

    Kemeny, L.

    2007-01-01

    On 19 and 20 April 2007, the Australian Nuclear Science and Technology Organisation (ANSTO) celebrated the recent commissioning of its new, world-class, OPAL (Open Pool Australian Lightwater) research reactor at the Lucas Heights. On the 19th, scientists, business leaders and academics were introduced to the reactor and its technical capacity for the manufacture of radiopharmaceuticals, its material science applications, its environmental services and its neutron scattering facilities for business applications. The formal OPAL opening function took place that evening and, on the 20th, Prime Minister John Howard visited ANSTO to be briefed about OPAL and to be shown the work being carried out at Lucas Heights

  4. Priming in concert: Assimilation and contrast with multiple affective and gender primes.

    NARCIS (Netherlands)

    Fockenberg, D.A.; Koole, S.L.; Semin, G.R.

    2008-01-01

    The present research investigated the influence of multiple sequential primes on social categorization processes. Study 1 examined an evaluative decision task in which targets were preceded and succeeded by two primes. As expected, the temporally closest forward primes had assimilative effects on

  5. Assuring the competence of nuclear power plant contractor personnel

    International Nuclear Information System (INIS)

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  6. Assuring the competence of nuclear power plant contractor personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This report was prepared in response to a recommendation by the IAEA International Working Group on Training and Qualification of NPP Personnel (JWG-T and Q) and supported by a number of IAEA meetings on NPP personnel training. IAEA publications on NPP training are the only international documents available to all Member States with nuclear programmes. This report complements the following IAEA publications on NPP personnel training: Technical Reports Series No. 380, Nuclear Power Plant Personnel Training and its Evaluation, A Guidebook; IAEA-TECDOC-1057, Experience in the Use of Systematic Approach to Training (SAT) for Nuclear Power Plant Personnel and IAEA-TECDOC-1063, IAEA World Survey on Nuclear Power Plant Personnel Training. This TECDOC also supplements the IAEA Safety Guide 50-SG-O1 (Rev. 1), Staffing of Nuclear Power Plants and the Recruitment Training and Authorization of Operating Personnel and Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants. Operation. Within the context of this report NPP contractors are defined as any personnel working for a nuclear power plant who are not directly employed by the nuclear power plant. Competence is the ability to perform to identified standards; it comprises skills, knowledge and attitudes and may be developed through education, experience and training. Qualification is a formal statement of achievement, resulting from an auditable assessment; if competence is assessed, the qualification becomes a formal statement of competence and may be shown on a certificate, diploma, etc. It is recognized that personnel are used to perform tasks that are of a specialised or temporary nature where it is not feasible to hire or maintain a full-time NPP employee. Accordingly, contractors may be used in a variety of situations to support NPPs. Typical situations include: supplies and services being delivered by the contractors that are subject to different quality standards based on a graded approach to assuring

  7. Safety issues at the defense production reactors

    International Nuclear Information System (INIS)

    1987-01-01

    The United States produces plutonium and tritium for use in nuclear weapons at the defense production reactors endash the N Reactor in Washington and the Savannah River reactors in South Carolina. This report reaches general conclusions about the management of those reactors and highlights a number of safety and technical issues that should be resolved. The report provides an assessment of the safety management, safety review, and safety methodology employed by the Department of Energy and the private contractors who operate the reactors for the federal government. The report is necessarily based on a limited review of the defense production reactors. It does not address whether any of the reactors are ''safe,'' because such an analysis would involve a determination of acceptable risk endash a matter of obvious importance, but one that was beyond the purview of the committee. It also does not address whether the safety of the production reactors is comparable to that of commercial nuclear power stations, because even this narrower question extended beyond the charge to the committee and would have involved detailed analyses that the committee could not undertake

  8. The elimination of positive priming with increasing prime duration reflects a transition from perceptual fluency to disfluency rather than bias against primed words.

    Science.gov (United States)

    Potter, Kevin W; Donkin, Chris; Huber, David E

    2018-03-01

    With immediate repetition priming of forced choice perceptual identification, short prime durations produce positive priming (i.e., priming the target leads to higher accuracy, while priming the foil leads to lower accuracy). Many theories explain positive priming following short duration primes as reflecting increased perceptual fluency for the primed target (i.e., decreased identification latency). However, most studies only examine either accuracy or response times, rather than considering the joint constraints of response times and accuracy to properly address the role of decision biases and response caution. This is a critical oversight because several theories propose that the transition to negative priming following a long duration prime reflects a decision strategy to compensate for the effect of increased perceptual fluency. In contrast, the nROUSE model of Huber and O'Reilly (2003) explains this transition as reflecting perceptual habituation, and thus a change to perceptual disfluency. We confirmed this prediction by applying a sequential sampling model (the diffusion race model) to accuracy and response time distributions from a new single item same-different version of the priming task. In this way, we measured strategic biases and perceptual fluency in each condition for each subject. The nROUSE model was only applied to accuracy from the original forced-choice version of the priming task. This application of nROUSE produced separate predictions for each subject regarding the degree of fluency and disfluency in each condition, and these predictions were confirmed by the drift rate parameters (i.e., fluency) from the response time model in contrast to the threshold parameters (i.e., bias). Copyright © 2017 Elsevier Inc. All rights reserved.

  9. Modelling Client Satisfaction Levels: The Impact of Contractor Performance

    Directory of Open Access Journals (Sweden)

    Robby Soetanto

    2012-11-01

    Full Text Available The performance of contractors is known to be a key determinant of client satisfaction.Here, using factor analysis, clients’ satisfaction is defined in several dimensions. Based onclients’ assessment of contractor performance, a number of satisfaction models developedusing the multiple regression (MR technique are presented. The models identify arange of variables encompassing contractor performance, project performance and respondent(i.e. client attributes as useful predictors of satisfaction levels. Contractor performanceattributes were found to be of utmost importance indicating that clientsatisfaction levels are mainly dependent on the performance of the contractor. Furthermore,findings suggest that subjectivity is to some extent prevalent in clients’ performanceassessment. The models demonstrate accurate and reliable predictive power as confirmedby validation tests. Contractors could use the models to help improve their performanceleading to more satisfied clients. This would also promote the development ofharmonious working relationships within the construction project coalition.

  10. 77 FR 6676 - Office of Inspector General; Contractor Requirements

    Science.gov (United States)

    2012-02-09

    ... POSTAL SERVICE 39 CFR Part 230 Office of Inspector General; Contractor Requirements AGENCY: Postal... for contractors employed by the Office of Inspector General. The rule also emphasizes consistency in contractor selection, and clarifies the OIG's exclusive authority to set qualifications and standards for its...

  11. Nuclear reactors built, being built, or planned in the United States as of June 30, 1982

    International Nuclear Information System (INIS)

    Goulden, A.M.

    1982-11-01

    This semiannual compilation provides current information about facilities for domestic use or export which are capable of sustaining a nuclear chain reaction. Civilian, production, and military reactors are listed, as are reactors for export and critical assembly facilities. Information given includes location, owner, principal nuclear contractor, type, power rating, docket number, and start-up and shutdown dates

  12. An independent safety assessment of Department of Energy nuclear reactor facilities: Procedures, operations and maintenance

    International Nuclear Information System (INIS)

    Toto, G.; Lindgren, A.J.

    1981-02-01

    The 1979 accident at the Three Mile Island commercial nuclear power plant has led to a number of studies of nuclear reactors, in both the public and private sectors. One of these is that of the Department of Energy's (DOE) Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee, which has outlined tasks for assessment of 13 reactors owned by DOE and operated by contractors. This report covers one of the tasks, the assessment of procedures, operations, and maintenance at the DOE reactor facilities, based on a review of actual documents used at the reactor sites

  13. 48 CFR 970.0407 - Contractor records retention.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor records retention. 970.0407 Section 970.0407 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0407 Contractor...

  14. 48 CFR 227.7108 - Contractor data repositories.

    Science.gov (United States)

    2010-10-01

    ... repositories. 227.7108 Section 227.7108 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS... Technical Data 227.7108 Contractor data repositories. (a) Contractor data repositories may be established when permitted by agency procedures. The contractual instrument establishing the data repository must...

  15. On the Control of Single-Prime Negative Priming: The Effects of Practice and Time Course

    Science.gov (United States)

    Chao, Hsuan-Fu

    2009-01-01

    Single-prime negative priming refers to the phenomenon wherein repetition of a prime as the probe target results in delayed response. Sometimes this effect has been found to be contingent on participants' unawareness of the primes, and sometimes it has not. Further, sometimes this effect has been found to be eliminated when the prime could predict…

  16. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  17. 48 CFR 1252.237-70 - Qualifications of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... contractor employees. 1252.237-70 Section 1252.237-70 Federal Acquisition Regulations System DEPARTMENT OF....237-70 Qualifications of contractor employees. As prescribed in (TAR) 48 CFR 1237.110(a), insert the following clause: Qualifications of Contractor Employees (APR 2005) a. Definitions. As used in this clause...

  18. 48 CFR 2452.237-75 - Clearance of contractor personnel.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Clearance of contractor... Clauses 2452.237-75 Clearance of contractor personnel. As prescribed in 2437.110(e), insert the following clause in solicitations and contracts. Clearance of Contractor Personnel (OCT 1999) (a) General. This...

  19. 40 CFR 33.302 - Are there any additional contract administration requirements?

    Science.gov (United States)

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY PROGRAMS Good Faith Efforts § 33.302 Are there any additional contract... require its prime contractor to employ the six good faith efforts described in § 33.301 even if the prime... the subcontract for any reason, the recipient must require the prime contractor to employ the six good...

  20. US DOE Idaho national laboratory reactor decommissioning

    International Nuclear Information System (INIS)

    Szilagyi, Andrew

    2012-01-01

    The United States Department of Energy (DOE) primary contractor, CH2M-WG Idaho was awarded the cleanup and deactivation and decommissioning contract in May 2005 for the Idaho National Lab (INL). The scope of this work included dispositioning over 200 Facilities and 3 Reactors Complexes (Engineering Test Reactor (ETR), Materials Test Reactor (MTR) and Power Burst Facility (PBF) Reactor). Two additional reactors were added to the scope of the contract during the period of performance. The Zero Power Physics Reactor (ZPPR) disposition was added under a separate subcontractor with the INL lab contractor and the Experimental Breeder Reactor II (EBR-II) disposition was added through American Recovery and Reinvestment Act (ARRA) Funding. All of the reactors have been removed and disposed of with the exception of EBR-II which is scheduled for disposition approximately March of 2012. A brief synopsis of the 5 reactors is provided. For the purpose of this paper the ZPPR reactor due to its unique design as compared to the other four reactors, and the fact that is was relatively lightly contaminated and irradiated will not be discussed with the other four reactors. The ZPPR reactor was readily accessible and was a relatively non-complex removal as compared to the other reactors. Additionally the EBR-II reactor is currently undergoing D and D and will have limited mention in this paper. Prior to decommissioning the reactors, a risk based closure model was applied. This model exercised through the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Non-Time Critical Removal Action (NTCRA) Process which evaluated several options. The options included; No further action - maintain as is, long term stewardship and monitoring (mothball), entombment in place and reactor removal. Prior to commencing full scale D and D, hazardous constituents were removed including cadmium, beryllium, sodium (passivated and elemental), PCB oils and electrical components, lead

  1. Subliminal semantic priming in speech.

    Directory of Open Access Journals (Sweden)

    Jérôme Daltrozzo

    Full Text Available Numerous studies have reported subliminal repetition and semantic priming in the visual modality. We transferred this paradigm to the auditory modality. Prime awareness was manipulated by a reduction of sound intensity level. Uncategorized prime words (according to a post-test were followed by semantically related, unrelated, or repeated target words (presented without intensity reduction and participants performed a lexical decision task (LDT. Participants with slower reaction times in the LDT showed semantic priming (faster reaction times for semantically related compared to unrelated targets and negative repetition priming (slower reaction times for repeated compared to semantically related targets. This is the first report of semantic priming in the auditory modality without conscious categorization of the prime.

  2. Materials requirements for liquid metal fast breeder reactors

    International Nuclear Information System (INIS)

    Bennett, J.W.; Horton, K.E.

    1978-01-01

    Materials requirements for Liquid Metal Fast Breeder Reactors (LMFBRs) are quite varied with requisite applications ranging from ex-reactor components such as piping, pumps, steam generators and heat exchangers to in-reactor components such as heavy section reactor vessels, core structurals, fuel pin cladding and subassembly flow ducts. Requirements for ex-reactor component materials include: good high temperature tensile, creep and fatigue properties; compatibility with high temperature flowing sodium; resistance to wear, stress corrosion cracking, and crack propagation; and good weldability. Requirements for in-reactor components include most of those cited above for ex-reactor components as supplemented by the following: resistance to radiation embrittlement, swelling and radiation enhanced creep; good neutronics; compatibility with fuel and fission product materials; and resistance to mass transfer via flowing sodium. Extensive programs are currently in place in a number of national laboratories and industrial contractors to address the materials requirements for LMFBRs. These programs are focused on meeting the near term requirements of early LMFBRs such as the Fast Flux Test Facility and the Clinch River Breeder Reactor as well as the longer term requirements of larger near-commercial and fully-commercial reactors

  3. Primes, Geometry and Condensed Matter

    Directory of Open Access Journals (Sweden)

    Al Rabeh R. H.

    2009-07-01

    Full Text Available Fascination with primes dates back to the Greeks and before. Primes are named by some "the elementary particles of arithmetic" as every nonprime integer is made of a unique set of primes. In this article we point to new connections between primes, geometry and physics which show that primes could be called "the elementary particles of physics" too. This study considers the problem of closely packing similar circles/spheres in 2D/3D space. This is in effect a discretization process of space and the allowable number in a pack is found to lead to some unexpected cases of prime configurations which is independent of the size of the constituents. We next suggest that a non-prime can be considered geometrically as a symmetric collection that is separable (factorable into similar parts- six is two threes or three twos for example. A collection that has no such symmetry is a prime. As a result, a physical prime aggregate is more difficult to split symmetrically resulting in an inherent stability. This "number/physical" stability idea applies to bigger collections made from smaller (prime units leading to larger stable prime structures in a limitless scaling up process. The distribution of primes among numbers can be understood better using the packing ideas described here and we further suggest that differing numbers (and values of distinct prime factors making a nonprime collection is an important factor in determining the probability and method of possible and subsequent disintegration. Disintegration is bound by energy conservation and is closely related to symmetry by Noether theorems. Thinking of condensed matter as the packing of identical elements, we examine plots of the masses of chemical elements of the periodic table, and also those of the elementary particles of physics, and show that prime packing rules seem to play a role in the make up of matter. The plots show convincingly that the growth of prime numbers and that of the masses of

  4. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  5. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  6. 48 CFR 52.236-6 - Superintendence by the Contractor.

    Science.gov (United States)

    2010-10-01

    ... Contractor. 52.236-6 Section 52.236-6 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....236-6 Superintendence by the Contractor. As prescribed in 36.506, insert the following clause: Superintendence by the Contractor (APR 1984) At all times during performance of this contract and until the work...

  7. Project WAGR: The UK demonstration project for power reactor decommissioning - removing the core and looking to completion

    International Nuclear Information System (INIS)

    Benest, T. G.

    2003-01-01

    delivered the required performance. In such cases, simple tooling and manual intervention have been adopted to maintain the project ahead of programme and below the dose budget. For campaigns where manual intervention was precluded by high dose rates, the contractor has undertaken a risk assessment of each task and elected to develop a number of different tools to cover the most likely risks. Although this strategy incurs costs for tools that may never be utilised, these costs are dwarfed by the project costs of potential delays. Excellent progress has been maintained throughout the remote dismantling with the reliability of the equipment and the experience of the workforce being major contributors to the success. Management arrangements have also contributed to the current excellent programme position. The close working relationship between UKAEA and their prime contractor, and management of the interfaces with the regulators, has enabled problems to be identified early and then dealt with quickly and effectively. The current phase of operations is now planned for completion in early 2005 over 18 months ahead of programme. Currently the WAGR project has operated for over 6 years without a lost time accident to either UKAEA staff or any of the contractor's operatives. In the last 12 months, the maximum radiation dose to an individual was <1.0 mSv. To date, 270 tonnes of graphite and 206 tonnes of steel have been encapsulated. 38 boxes of low level waste have been sent, or are awaiting transport, to BNFL's Drigg site for disposal, and a further 102 boxes of ILW are now stored on-site pending the availability of a national facility. Thus far the UKAEA WAGR project is well ahead of programme, achieving all its objectives and demonstrating to a world-wide audience that a power reactor can be decommissioned safely and efficiently shortly after shutdown

  8. Safety Management at PUSPATI TRIGA Reactor (RTP)

    International Nuclear Information System (INIS)

    Ligam, A.S.; Zarina Masood; Ahmad Nabil Abdul Rahim

    2011-01-01

    Adequate safety measures and precautions, which follow relevant safety standards and procedures, should be in place so that personnel safety is assured. Nevertheless, the public, visitor, contractor or anyone who wishes to enter or be in the reactor building should be well informed with the safety measures applied. Furthermore, these same elements of safety are also applied to other irradiation facilities within the premises of Nuclear Malaysia. This paper will describes and explains current safety management system being enforced especially in the TRIGA PUSPATI Reactor (RTP) namely radiation monitoring system, safety equipment, safe work instruction, and interconnected internal and external health, safety and security related departments. (author)

  9. Design Guide for Category I reactors critical facilities

    International Nuclear Information System (INIS)

    Brynda, W.J.; Powell, R.W.

    1978-08-01

    The purpose of this Design Guide is to provide additional guidance to aid the DOE facility contractor in meeting the requirement that the siting, design, construction, modification, operation, maintenance, and decommissioning of DOE-owned critical facilities be in accordance with generally uniform standards, guides, and codes which are comparable to those applied to similar reactors licensed by the Nuclear Regulatory Commission

  10. 76 FR 31416 - Federal Acquisition Regulation; Oversight of Contractor Ethics Programs

    Science.gov (United States)

    2011-05-31

    ...-AL92 Federal Acquisition Regulation; Oversight of Contractor Ethics Programs AGENCY: Department of... that contractors have implemented the mandatory contractor business ethics program requirements. DATES... to Improve DoD's Oversight of Contractor Ethics Programs. The ethics program requirement flows from...

  11. 48 CFR 1437.7001 - Contractor qualification requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor qualification requirements. 1437.7001 Section 1437.7001 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... Contractor qualification requirements. (a) Prior to award of a contract for real property appraisal services...

  12. Safety assessment of Department of Energy nuclear reactors

    International Nuclear Information System (INIS)

    1981-03-01

    One of the first tasks of the NFPQT Committee was to determine which DOE reactors would be assessed. The Committee determined that in view of the limited time available to conduct the assessment, 13 DOE reactors were of such size (physical, power or fission product inventory) to warrant review. This determination was approved by the Under Secretary. A decision was also made in the cases of three weapons material production reactors, C, K and P, to concentrate on the K reactor only, since all three are of the same basic design, have the same operating features, are all at the same site, and are all operated by the same contractor. The assessment was accomplished in the following ways: reviewing the results of assessments conducted by the DOE organizations with reactor safety responsibilities, which were undertaken in compliance with the request of the various program directors; reviewing selected documents that were requested by the Committee and assembled at DOE Headquarters; interviewing DOE Headquarters and Field Office personnel; and conducting on-site reviews of four reactors located at four different sites. The four reactors for on-site reviews were: Advanced Test Reactor (ATR); K Production Reactor; High Flux Beam Reactor (HFBR); and High Flux Isotope Reactor (HFIR). Specific findings and recommendations from the assessment are presented

  13. Advantages of the production contractor concept

    Energy Technology Data Exchange (ETDEWEB)

    Gisvold, K.M. [Golar-Nor Offshore, Trondheim (Norway)

    1994-12-31

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  14. Advantages of the production contractor concept

    International Nuclear Information System (INIS)

    Gisvold, K.M.

    1994-01-01

    This paper presents some thoughts on the Production Contractor concept. It starts with an attempt to define the prerequisites for such contractorship to exist and develop, going on to examine the considerations that the oil company and the contractor respectively have to go through, and finally trying to summarize what emerges as the advantages of production contracting. Examples are given to emphasize particular points

  15. Cognate status and cross-script translation priming.

    Science.gov (United States)

    Voga, Madeleine; Grainger, Jonathan

    2007-07-01

    Greek-French bilinguals were tested in three masked priming experiments with Greek primes and French targets. Related primes were the translation equivalents of target words, morphologically related to targets, or phonologically related to targets. In Experiment 1, cognate translation equivalents (phonologically similar translations) showed facilitatory priming, relative to matched phonologically related primes, in conditions in which morphologically related primes showed no effect (50-msec prime exposure). Cross-language morphological priming emerged at longer prime exposure durations (66 msec), but cognate primes continued to generate more priming than did those in the morphological condition. In Experiments 2 and 3, the level of phonological overlap across translation equivalents was varied, and priming effects were measured against those for matched phonologically related primes and those in an unrelated prime condition. When measured against the unrelated baseline, cognate primes showed the typical advantage over noncognate primes. However, this cognate advantage disappeared when priming was measured against the phonologically related prime condition. The results are discussed in terms of how translation equivalents are represented in bilingual memory.

  16. False memories and lexical decision: even twelve primes do not cause long-term semantic priming.

    Science.gov (United States)

    Zeelenberg, René; Pecher, Diane

    2002-03-01

    Semantic priming effects are usually obtained only if the prime is presented shortly before the target stimulus. Recent evidence obtained with the so-called false memory paradigm suggests, however, that in both explicit and implicit memory tasks semantic relations between words can result in long-lasting effects when multiple 'primes' are presented. The aim of the present study was to investigate whether these effects would generalize to lexical decision. In four experiments we showed that even as many as 12 primes do not cause long-term semantic priming. In all experiments, however, a repetition priming effect was obtained. The present results are consistent with a number of other results showing that semantic information plays a minimal role in long-term priming in visual word recognition.

  17. 14 CFR 1274.402 - Contractor acquired property.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Contractor acquired property. 1274.402 Section 1274.402 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Property § 1274.402 Contractor acquired property. As provided in § 1274.923...

  18. 48 CFR 1646.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be inserted...

  19. Nuclear reactor safety program in US department of energy and future perspectives

    International Nuclear Information System (INIS)

    Song, Y.T.

    1988-01-01

    The US Department of Energy (DOE) establishes policy, issues orders, and assures compliance with requirements. The contractors who design, construct, modify, operate, maintain and decommission DOE reactors, set forth the assessment of the safety of cognizant reactors and implement DOE orders. Teams of experts in the Department, through scheduled and unscheduled review programs, reassess the safety of reactors in every phases of their lives. As new technology develops, the safety programs are reevaluated and policies are modified to accommodate these new technologies. The diagnostic capabilities of the computer using multiple alarms to enhance detection of defects and control of a reactor have been greatly utilized in reactor operating systems. The Application of artificial intelligence technologies for diagnostic and even for the decision making process in the event of reactor accidents would be one of the future trends in reactor safety programs

  20. 48 CFR 645.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  1. Applications of plasma core reactors to terrestrial energy systems

    International Nuclear Information System (INIS)

    Lantham, T.S.; Biancardi, F.R.; Rodgers, R.J.

    1974-01-01

    Plasma core reactors offer several new options for future energy needs in addition to space power and propulsion applications. Power extraction from plasma core reactors with gaseous nuclear fuel allows operation at temperatures higher than conventional reactors. Highly efficient thermodynamic cycles and applications employing direct coupling of radiant energy are possible. Conceptual configurations of plasma core reactors for terrestrail applications are described. Closed-cycle gas turbines, MHD systems, photo- and thermo-chemical hydrogen production processes, and laser systems using plasma core reactors as prime energy sources are considered. Cycle efficiencies in the range of 50 to 65 percent are calculated for closed-cycle gas turbine and MHD electrical generators. Reactor advantages include continuous fuel reprocessing which limits inventory of radioactive by-products and thorium-U-233 breeder configurations with about 5-year doubling times

  2. Primes, Geometry and Condensed Matter

    Directory of Open Access Journals (Sweden)

    Al Rabeh R. H.

    2009-07-01

    Full Text Available Fascination with primes dates back to the Greeks and before. Primes are named by some “the elementary particles of arithmetic” as every nonprime integer is made of a unique set of primes. In this article we point to new connections between primes, geometry and physics which show that primes could be called “the elementary particles of physics” too. This study considers the problem of closely packing similar circles / spheres in 2D / 3D space. This is in effect a discretization process of space and the allowable num- ber in a pack is found to lead to some unexpected cases of prime configurations which is independent of the size of the constituents. We next suggest that a non-prime can be considered geometrically as a symmetric collection that is separable (factorable into similar parts- six is two threes or three twos for example. A collection that has no such symmetry is a prime. As a result, a physical prime aggregate is more difficult to split symmetrically resulting in an inherent stability. This “number / physical” stability idea applies to bigger collections made from smaller (prime units leading to larger sta- ble prime structures in a limitless scaling up process. The distribution of primes among numbers can be understood better using the packing ideas described here and we further suggest that differing numbers (and values of distinct prime factors making a nonprime collection is an important factor in determining the probability and method of possible and subsequent disintegration. Disintegration is bound by energy conservation and is closely related to symmetry by Noether theorems. Thinking of condensed matter as the packing of identical elements, we examine plots of the masses of chemical elements of the periodic table, and also those of the elementary particles of physics, and show that prime packing rules seem to play a role in the make up of matter. The plots show con- vincingly that the growth of prime numbers and that

  3. Prime Contract Awards by Service Category and Federal Supply Classification, Fiscal Years 1973, 1974, 1975, 1976.

    Science.gov (United States)

    1976-11-09

    most of the steel plate for ships is purchased by Defense prime contractors, and only a small portion is obtained by direct DoD purchase (see Code 9515...7.14S 9,0St U29 TRAINING OF GOVT PERSONNEL OTHER THAN U621-UG26 26, h13 4.7,63S 215,165 61,603 ’ TOTAL 86,092 116,316 333,121 145,039 V4...S5 M4AFID TOOLS 2.566 4,696 4,SS6 11,206 S2 EASURING TOOLS 1,46S LS6L 1,S94 16 a3 S3 MARONARE AND ABRASIVES 2 364Y 37,967 4.534 o.26 6 54

  4. Nuclear engineering R ampersand D at the Savannah River Site

    International Nuclear Information System (INIS)

    Strosnider, D.R.; Ferrara, W.R.

    1991-01-01

    The Westinghouse Savannah River Company (WSRC) is the prime operating contractor for the US Department of Energy at the Savannah River Site (SRS), located near Aiken, South Carolina. One division of WSRC, the Savannah River Laboratory (SRL), has the primary responsibility for research and development, which includes supporting the safe and efficient operation of the SRS production reactors. Several Sections of SRL, as well as other organization in WSRC, pursue R ampersand D and oversight activities related to nuclear engineering. The Sections listed below are described in more detail in this document: (SRL) nuclear reactor technology and scientific computations department; (SRL) safety analysis and risk management department; (WSRC) new production reactor program; and (WSRC) environment, safety, health, and quality assurance division

  5. All Prime Contract Awards by State or Country, Place, and Contractor, FY83, Part 1 (Argentina-Goodyear, Arizona).

    Science.gov (United States)

    1983-01-01

    C6116 B C Z 5 2 2 Z119 000 C2 MAINT-REPAIR-ALTER/OTHER ADM 7 9 3 5 L 06 1 B J 1 I 6 1 E OJA37 0772 DAJA37-83-C0153 B C Z 5 2 2 7710 000 C9E MUSICAL ...06 1 B J 1 J 212 .SCO GMBH GERMANY 090613 0000 GY E OJA37 0773 DAJA37-83-C0154 B C Z 5 2 2 7710 000 C9E MUSICAL INSTRUMENTS 7 9 3 5 L 06 5 B J I A 37...54 CONTRACTOR TOTAL 2 138 UNIMARE UFFICIO VIAGGI E TURISMO ITALY 031940 0000 IT 2 A NA112 0027 N68171-83-C0021 B C Z 5 2 2 V211 000 $1 AIR PASSENGER

  6. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 2 (Air Force Academy, Colorado-Zion, Illinois).

    Science.gov (United States)

    1984-01-01

    HETRA CORPORATION 131 131 MARTIN MARIETTA CORPORATION 3,478 3,478 NEWPORT ELECTRO - OPTICS 36 36 OPTO MECHANIK INC 2,293 2,293 REGAL MATTRESS COMPANY INC...TELEPHONE & TELO CO 584 58 RIVIERA BEACH BIG THREE INDUSTRIES INC 628 626 KOEHLKE COMPONENTS INC 85 85 LENZAR OPTICS CORP 966 966 MICRO TOOL a ENGINEERING...LOCATION CONTRACTOR DOD AIR NAME NAME TOTAL ARMY NAVY FORCE DLA OCE AURORA ELECTRO -TEST INC 95 95 ELLIS THEODORE AND COMPANY 82 82 FAMILY MOTEL 27 27

  7. Contractors on the Battlefield: Planning Considerations and Requirements

    National Research Council Canada - National Science Library

    2002-01-01

    Contractors on the Battlefield: Planning Considerations and Requirements introduces the basics and foundation for those who want to learn about the history, terminology, and process for obtaining contractor support on the battlefield...

  8. 78 FR 1256 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2013-01-08

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Final notice... issuing this notice to announce recruitment standards that construction contractors are required to follow... B) by adding a new subsection (6). This provision prohibits contractors engaged in construction...

  9. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  10. Sequential Stereotype Priming: A Meta-Analysis.

    Science.gov (United States)

    Kidder, Ciara K; White, Katherine R; Hinojos, Michelle R; Sandoval, Mayra; Crites, Stephen L

    2017-08-01

    Psychological interest in stereotype measurement has spanned nearly a century, with researchers adopting implicit measures in the 1980s to complement explicit measures. One of the most frequently used implicit measures of stereotypes is the sequential priming paradigm. The current meta-analysis examines stereotype priming, focusing specifically on this paradigm. To contribute to ongoing discussions regarding methodological rigor in social psychology, one primary goal was to identify methodological moderators of the stereotype priming effect-whether priming is due to a relation between the prime and target stimuli, the prime and target response, participant task, stereotype dimension, stimulus onset asynchrony (SOA), and stimuli type. Data from 39 studies yielded 87 individual effect sizes from 5,497 participants. Analyses revealed that stereotype priming is significantly moderated by the presence of prime-response relations, participant task, stereotype dimension, target stimulus type, SOA, and prime repetition. These results carry both practical and theoretical implications for future research on stereotype priming.

  11. Evaluating advanced LMR [liquid metal reactor] reactivity feedbacks using SSC

    International Nuclear Information System (INIS)

    Slovik, G.C.; Van Tuyle, G.J.; Kennett, R.J.; Cheng, H.S.

    1988-01-01

    Analyses of the PRISM and SAFR Liquid Metal Reactors with SSC are discussed from a safety and licensing perspective. The PRISM and SAFR reactors with metal fuel are designed for inherent shutdown responses to loss-of-flow and loss-of-heat-sink events. The demonstration of this technology was performed by EBR-II during experiments in April 1986 by ANL (Planchon, et al.). Response to postulated TOPs (control rod withdrawal) are made acceptable largely by reducing reactivity swings, and therefore minimizing the size of possible ractivity insertions. Analyses by DOE and the contractors GE, RI, and ANL take credit for several reactivity feedback mechanisms during transient calculations. These feedbacks include Doppler, sodium density, and thermal expansion of the grid plates, the load pads, the fuel (axial) and the control rod which are now factored into the BNL SSC analyses. The bowing feedback mechanism is not presently modeled in the SSC due to its complexity and subsequent large uncertainty. The analysis is conservative by not taking credit for this negative feedback mechanism. Comparisons of BNL predictions with DOE contractors are provided

  12. Accounting calculations problems with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Tikholaz I.A.

    2016-12-01

    Full Text Available in the article an order of accounting reflection of payments with suppliers and contractors are researched and ways of enhancement of accounting calculations process development with the purpose of management decisions optimization for their implementation are offered. Theoretical bases of intraeconomic control of settlings with suppliers and contractors are developed.

  13. National Radon Contractor Proficiency (RCP) Program. Proficiency report, June 1991

    International Nuclear Information System (INIS)

    1991-06-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in periodic RCP Proficiency Reports

  14. National Radon Contractor Proficiency (RCP) program. Proficiency report, September 1991

    International Nuclear Information System (INIS)

    1991-09-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving this objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide this information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under this voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  15. National Radon Contractor Proficiency (RCP) Program. Proficiency report, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The primary objective of the U.S. Environmental Protection Agency's (EPA) efforts to address the indoor radon problem is to reduce radon levels in buildings throughout the country. Achieving the objective requires a nationwide supply of capable radon mitigation contractors. In the Indoor Radon Abatement Act of 1988, Congress authorized EPA to establish a program to evaluate radon mitigation contractors and to provide the information to the public in cooperation with the States. The Radon Contractor Proficiency (RCP) Program was developed to assist States, EPA Regions, local government officials, and the public in selecting contractors who have demonstrated their proficiency in reducing indoor radon levels. The program is managed by the EPA Office of Radiation Programs' Radon Division. Under the voluntary program, radon contractors demonstrate their proficiency by meeting specific Program requirements. Individual contractors who meet these requirements are then listed in the Report

  16. 48 CFR 1403.570 - Restrictions on contractor advertising.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Restrictions on contractor advertising. 1403.570 Section 1403.570 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR... 1403.570 Restrictions on contractor advertising. ...

  17. 76 FR 48776 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-09

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor... published in the Federal Register of June 28, 2011, regarding the proposed rule for Documenting Contractor...

  18. Unconscious Congruency Priming from Unpracticed Words Is Modulated by Prime-Target Semantic Relatedness

    Science.gov (United States)

    Ortells, Juan J.; Mari-Beffa, Paloma; Plaza-Ayllon, Vanesa

    2013-01-01

    Participants performed a 2-choice categorization task on visible word targets that were preceded by novel (unpracticed) prime words. The prime words were presented for 33 ms and followed either immediately (Experiments 1-3) or after a variable delay (Experiments 1 and 4) by a pattern mask. Both subjective and objective measures of prime visibility…

  19. 42 CFR 405.874 - Appeals of CMS or a CMS contractor.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Appeals of CMS or a CMS contractor. 405.874 Section... Part B Program § 405.874 Appeals of CMS or a CMS contractor. A CMS contractor's (that is, a carrier... supplier enrollment application. If CMS or a CMS contractor denies a provider's or supplier's enrollment...

  20. Leading, but not trailing, primes influence temporal order perception: further evidence for an attentional account of perceptual latency priming.

    Science.gov (United States)

    Scharlau, Ingrid

    2002-11-01

    Presenting a masked prime leading a target influences the perceived onset of the masking target (perceptual latency priming; Scharlau & Neumann, in press). This priming effect is explained by the asynchronous updating model (Neumann, 1982; Scharlau & Neumann, in press): The prime initiates attentional allocation toward its location, which renders a trailing target at the same place consciously available earlier. In three experiments, this perceptual latency priming by leading primes was examined jointly with the effects of trailing primes in order to compare the explanation of the asynchronous updating model with the onset-averaging and the P-center hypotheses. Experiment 1 showed that an attended, as well as an unattended, prime leads to perceptual latency priming. In addition, a large effect of trailing primes on the onset of a target was found. As Experiment 2 demonstrated, this effect is quite robust, although smaller than that of a leading prime. In Experiment 3, masked primes were used. Under these conditions, no influence of trailing primes could be found, whereas perceptual latency priming persisted. Thus, a nonattentional explanation for the effect of trailing primes seems likely.

  1. Mechanisms of subliminal response priming.

    Science.gov (United States)

    Kiesel, Andrea; Kunde, Wilfried; Hoffmann, Joachim

    2008-07-15

    Subliminal response priming has been considered to operate on several stages, e.g. perceptual, central or motor stages might be affected. While primes' impact on target perception has been clearly demonstrated, semantic response priming recently has been thrown into doubt (e.g. Klinger, Burton, & Pitts, 2000). Finally, LRP studies have revealed that subliminal primes evoke motor processes. Yet, the premises for such prime-evoked motor activation are not settled. A transfer of priming to stimuli that have never been presented as targets appears particularly interesting because it suggests a level of processing that goes beyond a reactivation of previously acquired S-R links. Yet, such transfer has not always withstood empirical testing. To account for these contradictory results, we proposed a two-process model (Kunde, Kiesel, & Hoffmann, 2003): First, participants build up expectations regarding imperative stimuli for the required responses according to experience and/or instructions. Second, stimuli that match these "action triggers" directly activate the corresponding motor responses irrespective of their conscious identification. In line with these assumptions, recent studies revealed that non-target primes induce priming when they fit the current task intentions and when they are expected in the experimental setting.

  2. Dollar Summary of Prime Contract Awards with Principal Place of Performance Outside the U.S. by Country and Contractor, FY83.

    Science.gov (United States)

    1983-01-01

    52- MEHMET AKOENIZ IZOLASYON TAAHHUT TURKEY a8 96 MEHIET OZVEREN TURKEY 31 31 MINEX NUN MUT TURKEY 104 104 MITHAT YENIGUN TURKEY 1,640 1,640 I PRIME...CORP TURKEY 6,650 6,650 HUHENDISLIK ERE LTD STI TURKEY 130 130 MUSTAFA QOKALP TURKEY 109 109 NADIR SONEN TURKEY 30 30 ONAR I|NSAAV TI CARET VE SAAYII

  3. USA NRC/RSR Data Bank System and Reactor Safety Research Data Repository (RSRDR)

    International Nuclear Information System (INIS)

    Maskewitz, B.F.; Bankert, S.F.

    1979-01-01

    The United States Nuclear Regulatory Commission (NRC), through its Division of Reactor Safety Research (RSR) of the Office of Nuclear Regulatory Research, has established the NRC/RSR Data Bank Program to collect, process, and make available data from the many domestic and foreign water reactor safety research programs. An increasing number of requests for data and/or calculations generated by NRC Contractors led to the initiation of the program which allows timely and direct access to water reactor safety data in a manner most useful to the user. The program consists of three main elements: data sources, service organizations, and a data repository

  4. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    Science.gov (United States)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent

  5. 48 CFR 2804.470 - Contractor Personnel Security Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Personnel Security Program. 2804.470 Section 2804.470 Federal Acquisition Regulations System DEPARTMENT OF JUSTICE General ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 2804.470 Contractor...

  6. 29 CFR 500.60 - Farm labor contractors' recruitment, contractual and general obligations.

    Science.gov (United States)

    2010-07-01

    ... labor contractors' recruitment, contractual and general obligations. The Act imposes certain specific recruitment, contractual and general obligations on farm labor contractors and farm labor contractor employees... 29 Labor 3 2010-07-01 2010-07-01 false Farm labor contractors' recruitment, contractual and...

  7. Rhizosphere priming: a nutrient perspective

    Directory of Open Access Journals (Sweden)

    Feike Auke Dijkstra

    2013-07-01

    Full Text Available Rhizosphere priming is the change in decomposition of soil organic matter (SOM caused by root activity. Rhizosphere priming plays a crucial role in soil carbon (C dynamics and their response to global climate change. Rhizosphere priming may be affected by soil nutrient availability, but rhizosphere priming itself can also affect nutrient supply to plants. These interactive effects may be of particular relevance in understanding the sustained increase in plant growth and nutrient supply in response to a rise in atmospheric CO2 concentration. We examined how these interactions were affected by elevated CO2 in two similar semiarid grassland field studies. We found that an increase in rhizosphere priming enhanced the release of nitrogen (N through decomposition of a larger fraction of SOM in one study, but not in the other. We postulate that rhizosphere priming may enhance N supply to plants in systems that are N limited, but that rhizosphere priming may not occur in systems that are phosphorus (P limited. Under P limitation, rhizodeposition may be used for mobilisation of P, rather than for decomposition of SOM. Therefore, with increasing atmospheric CO2 concentrations, rhizosphere priming may play a larger role in affecting C sequestration in N poor than in P poor soils.

  8. Selection and assessment of contractors; Auswahl und Beurteilung von Auftragnehmerfirmen

    Energy Technology Data Exchange (ETDEWEB)

    Lier, K.H. [ExxonMobil Production Deutschland GmbH, Hannover (Germany)

    2007-09-13

    Reliable and efficient contractors are important for the activities of ExxonMobil. Qualification of contractors is to ensure that contractors provide technical services in accordance with the specifications of ExxonMobil. Apart from the financial, oranisational and legal qualification this covers technical qualification, i.e. industrial safety, health protection and environmental protection, as well as technical efficiency and quality. The ultimate intention is to find out if contractors have the processes and systems at their disposal that are required for the services. The qualification process is described. (orig.)

  9. Information technology boosts contractor's economic success

    International Nuclear Information System (INIS)

    Penny, M.; Vasey, G.M.

    1995-01-01

    This article will discuss the advantages of Information Technology (IT) and how one drilling contractor, Global Marine, has applied this technology. The company has applied it in an efficient manner which has provided business benefits and cost reductions that have helped its operations be more successful. The following are the different aspects of information technology that led to the contractor's success: cost reduction measures; migration to a client/server IT infrastructure; IT business benefits; and keys to obtaining business benefits from IT

  10. Investigation of techniques for the application of safeguards to a continuously fuelled reactor

    International Nuclear Information System (INIS)

    Hodgkinson, J.G.; Head, D.A.

    1978-03-01

    The following three areas of prime safeguards concern are analyzed: 1) at the reactor face, where spent fuel is first removed from the channel, 2) along the system for transporting spent fuel from the reactor to the storage bay, and 3) in the spent fuel storage bay. The program is designed to develop techniques and instruments to safeguard these areas

  11. Contractor Selection for Enhancing the Quality of University ...

    African Journals Online (AJOL)

    Contractor Selection for Enhancing the Quality of University Education in Nigeria using the Hamming Distance. DEA Omorogbe, SO Aibieyi. Abstract. The need for contractor selection in our university education system cannot be over emphasized. And applying scientific techniques for appropriateness and accuracy in the ...

  12. 48 CFR 36.201 - Evaluation of contractor performance.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Evaluation of contractor performance. 36.201 Section 36.201 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... Contracting for Construction 36.201 Evaluation of contractor performance. See 42.1502(e) for the requirements...

  13. 48 CFR 49.405 - Completion by another contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Completion by another contractor. 49.405 Section 49.405 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION... contractor. If the surety does not arrange for completion of the contract, the contracting officer normally...

  14. Fiscal Liability of State Contractors

    Directory of Open Access Journals (Sweden)

    Santiago Fajardo-Peña

    2017-06-01

    Full Text Available The State contract is one of the most important tools for public management. The formation, execution and liquidation of State contracts are also a potential cause of State patrimonial damages. Perhaps for this reason, many State contractors are prosecuted as if they were public spending managers. The question, however, is not as simple. The fiscal liability process has a qualified recipient: the fiscal manager. In this article, through a conceptual exposition and a case study, we identify the criterion for determining in which cases a State contractor acquires the function of controlling public funds and when he/she can be subjected to a fiscal liability.

  15. Degree of handedness and priming: Further evidence for a distinction between production and identification priming mechanisms.

    Directory of Open Access Journals (Sweden)

    Donna J. LaVoie

    2015-02-01

    Full Text Available The distinction between implicit and explicit forms of memory retrieval is long-standing, and important to the extent it reveals how different neural architecture supports different aspects of memory function. Similarly, distinctions have been made between kinds of repetition priming, a form of implicit memory retrieval. This study focuses on the production-identification priming distinction, which delineates priming tasks involving verification of stimulus features as compared to priming tasks that require use of a cue to guide response retrieval. Studies investigating this dissociation in dementia or similar patient populations indicate that these forms of priming may differ in their neural bases. The current study looks at degree of handedness as a way of investigating inferred neural architecture supporting these two forms of priming. A growing body of research indicates that degree of handedness (consistent, or CH, versus inconsistent, or ICH is associated with greater interhemispheric interaction and functional access to right hemisphere processing in ICH, with superior performance seen in ICH on memory tasks reliant on this processing. Arguments about the theoretical mechanisms underlying identification and production forms of perceptual priming tasks suggest that performance on these tasks will differ as a function of degree of handedness. We tested this question in a group of CH and ICH young adults, who were asked to study lists of words prior to performing a production priming task (word stem completion, a perceptual word identification task, and a word stem cued recall task. While both handedness groups exhibited reliable priming across tasks, word stem completion priming was greater in ICH than CH participants, with identification priming not differing between groups. This dissociation supports the argument that production and identification forms of priming have different underlying neural bases.

  16. Rapid response learning of brand logo priming: Evidence that brand priming is not dominated by rapid response learning.

    Science.gov (United States)

    Boehm, Stephan G; Smith, Ciaran; Muench, Niklas; Noble, Kirsty; Atherton, Catherine

    2017-08-31

    Repetition priming increases the accuracy and speed of responses to repeatedly processed stimuli. Repetition priming can result from two complementary sources: rapid response learning and facilitation within perceptual and conceptual networks. In conceptual classification tasks, rapid response learning dominates priming of object recognition, but it does not dominate priming of person recognition. This suggests that the relative engagement of network facilitation and rapid response learning depends on the stimulus domain. Here, we addressed the importance of the stimulus domain for rapid response learning by investigating priming in another domain, brands. In three experiments, participants performed conceptual decisions for brand logos. Strong priming was present, but it was not dominated by rapid response learning. These findings add further support to the importance of the stimulus domain for the relative importance of network facilitation and rapid response learning, and they indicate that brand priming is more similar to person recognition priming than object recognition priming, perhaps because priming of both brands and persons requires individuation.

  17. 77 FR 43078 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2012-07-23

    ...; Information Collection; Central Contractor Registration AGENCY: Department of Defense (DOD), General Services... requirement concerning the Central Contractor Registration database. Public comments are particularly invited... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  18. Mechanisms of masked evaluative priming: task sets modulate behavioral and electrophysiological priming for picture and words differentially.

    Science.gov (United States)

    Kiefer, Markus; Liegel, Nathalie; Zovko, Monika; Wentura, Dirk

    2017-04-01

    Research with the evaluative priming paradigm has shown that affective evaluation processes reliably influence cognition and behavior, even when triggered outside awareness. However, the precise mechanisms underlying such subliminal evaluative priming effects, response activation vs semantic processing, are matter of a debate. In this study, we determined the relative contribution of semantic processing and response activation to masked evaluative priming with pictures and words. To this end, we investigated the modulation of masked pictorial vs verbal priming by previously activated perceptual vs semantic task sets and assessed the electrophysiological correlates of priming using event-related potential (ERP) recordings. Behavioral and electrophysiological effects showed a differential modulation of pictorial and verbal subliminal priming by previously activated task sets: Pictorial priming was only observed during the perceptual but not during the semantic task set. Verbal priming, in contrast, was found when either task set was activated. Furthermore, only verbal priming was associated with a modulation of the N400 ERP component, an index of semantic processing, whereas a priming-related modulation of earlier ERPs, indexing visuo-motor S-R activation, was found for both picture and words. The results thus demonstrate that different neuro-cognitive processes contribute to unconscious evaluative priming depending on the stimulus format. © The Author (2016). Published by Oxford University Press. For Permissions, please email: journals.permissions@oup.com.

  19. 78 FR 12316 - Federal Acquisition Regulation; Information Collection; Central Contractor Registration

    Science.gov (United States)

    2013-02-22

    ...; Information Collection; Central Contractor Registration AGENCIES: Department of Defense (DOD), General... collection requirement concerning the Central Contractor Registration database. A notice was published in the... Information Collection 9000- 0159, Central Contractor Registration, by any of the following methods...

  20. Nuclear reactor safety program in U.S. Department of Energy and future perspectives

    International Nuclear Information System (INIS)

    Song, Y.T.

    1987-01-01

    The U.S. Department of Energy (DOE) establishes policy, issues orders, and assures compliance with requirements. The contractors who design, construct, modify, operate, maintain and decommission DOE reactors, set forth the assessment of the safety of cognizant reactors and impliment DOE orders. Teams of experts in the Depatment, through scheduled and unscheduled review programs, reassess the safety of reactors in every phases of their lives. As new technology develops, the safety programs are reevaluated and policies are modified to accommodate these new technologies. The diagnostic capabilities of the computer using multiple alarms to enhance detection of defects and control of a reactor have been greatly utilized in reactor operating systems. The application of artificial intelligence (AI) technologies for diagnostic and even for the decision making process in the event of reactor accidents would be one of the future trends in reactor safety programs. (author)

  1. A Prime Example of the Maluma/Takete Effect? Testing for Sound Symbolic Priming.

    Science.gov (United States)

    Sidhu, David M; Pexman, Penny M

    2017-09-01

    Certain nonwords, like maluma and takete, are associated with roundness and sharpness, respectively. However, this has typically been demonstrated using explicit tasks. We investigated whether this association would be detectable using a more implicit measure-a sequential priming task. We began with a replication of the standard Maluma/Takete effect (Experiments 1a and 1b) before examining whether round and sharp nonword primes facilitated the categorization of congruent shapes (Experiment 2). We found modest evidence of a priming effect in response accuracy. We next examined whether nonword primes affected categorization of ambiguous shapes, using visual (Experiment 3) and auditory primes (Experiment 4). We found that ambiguous shapes were categorized as round (sharp) more often following the presentation of a round (sharp) nonword. This suggests that phonemes may activate related shape information which then affects the processing of shapes, and that this association emerges even when participants are not explicitly searching for it. Copyright © 2016 Cognitive Science Society, Inc.

  2. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  3. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  4. Optimal Contractor Selection in Construction Industry: The Fuzzy Way

    Science.gov (United States)

    Krishna Rao, M. V.; Kumar, V. S. S.; Rathish Kumar, P.

    2018-02-01

    A purely price-based approach to contractor selection has been identified as the root cause for many serious project delivery problems. Therefore, the capability of the contractor to execute the project should be evaluated using a multiple set of selection criteria including reputation, past performance, performance potential, financial soundness and other project specific criteria. An industry-wide questionnaire survey was conducted with the objective of identifying the important criteria for adoption in the selection process. In this work, a fuzzy set based model was developed for contractor prequalification/evaluation, by using effective criteria obtained from the percept of construction professionals, taking subjective judgments of decision makers also into consideration. A case study consisting of four alternatives (contractors in the present case) solicited from a public works department of Pondicherry in India, is used to illustrate the effectiveness of the proposed approach. The final selection of contractor is made based on the integrated score or Overall Evaluation Score of the decision alternative in prequalification as well as bid evaluation stages.

  5. First year evaluation of EPA's radon contractor proficiency (RCP) program

    International Nuclear Information System (INIS)

    Salmon, G.L.

    1990-01-01

    This paper reports that the Environmental Protection Agency (EPA) has developed a voluntary program to evaluate radon reduction contractors and provide this information to the public, as part of activities mandated by the Indoor Radon Abatement Act (IRAA) of 1988. The Radon Contractor Proficiency Program consists of several elements that collectively help to ensure the proficiency of radon mitigators and give the public greater confidence in their capability. Contractors who participate in the program must pass a written examination, adhere to mitigation guidelines, keep records of work, meet continuing education requirements and pass a re-examination every two years. Upon meeting the program's requirements, mitigators are listed in EPA's National RCP Proficiency Report. The first Report released on May 15, 1990 listed 636 contractors. The second Report, to be release in August, will list 895 contractors, representing an increase of 40 per cent

  6. Designing a tool for an effective assessment of purchasing maturity in construction

    NARCIS (Netherlands)

    Bemelmans, Jeroen; Voordijk, Johannes T.; Vos, B.

    2013-01-01

    Purpose – Prime contractors spend up to 90 per cent of a construction project's turnover on buying goods and services, and thus suppliers have a large impact on project performance. Therefore, the purchasing function management of the prime contractor has a large influence on the overall

  7. Operator and contractor benefit from incentive contracts

    International Nuclear Information System (INIS)

    Brandon, B.

    1991-01-01

    This book reports that with incentive contracts, drilling and service contractors assume greater responsibility for operations. That helps them to align their goals more closely with those of the operator. This achieves a more equitable division of the risks. Many operators and contractors believe this is a more appropriate approach to contracting drilling services. As they assume manageable responsibility, each party also has opportunities for greater reward. Innovations in cooperation can create a win-win situation. In a win-win contract all parties benefit from the new relationships between operator, contractor, and service company. The win-win situation can only be achieved by allowing the contracting parties to become much more closely involved in drilling operations. This is the primary motivation behind development of more productive contracting strategies

  8. Status report on nuclear reactors for space electric power

    International Nuclear Information System (INIS)

    Buden, D.

    1978-01-01

    The Los Alamos Scientific Laboratory is studying reactor power plants for space applications in the late 1980s and 1990s. The study is concentrating on high-temperature, compact, fast reactors that can be coupled with various radiation shielding systems and thermoelectric, dynamic, or thermionic electric power conversion systems, depending on the mission. Increased questions have been raised about safety since the COSMOS 954 incident. High orbits (above 400 to 500 nautical miles) have sufficient lifetimes to allow radioactive elements to decay to safe levels. The major proposed applications for satellites with reactors in Earth orbit are in geosynchronous orbit (19,400 nautical miles). In missions at geosynchronous orbit where orbital lifetimes are practically indefinite, the safety considerations are negligible. The potential missions, why reactors are being considered as a prime power candidate, reactor features, and safety considerations are discussed

  9. Prime Slaughter

    DEFF Research Database (Denmark)

    Valente, Andrea; Marchetti, Emanuela

    2011-01-01

    of primality and factorization into playful interactions, addressed to primary and early secondary school children. Taking into account individual needs expressed by children regarding play, during a participatory design processes aimed at enhancing learning in museums, Prime Slaughter allows for multiple......Starting from the difficulty of creating playful representation of domain-specific abstract concepts, this study discusses the design of Prime Slaughter, a computer game aimed at facilitating individual sense-making of abstract mathematical concepts. Specifically the game proposes a transposition...

  10. 77 FR 69715 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2012-11-20

    ... Contractor Registration AGENCY: Department of Defense (DoD), General Services Administration (GSA), and... changes the clauses requiring contractor registration in the Central Contractor Registration (CCR... unique identifier for contractors. It is used (1) to uniquely identify a contractor entity, and (2) to...

  11. Discovery: Prime Numbers

    Science.gov (United States)

    de Mestre, Neville

    2008-01-01

    Prime numbers are important as the building blocks for the set of all natural numbers, because prime factorisation is an important and useful property of all natural numbers. Students can discover them by using the method known as the Sieve of Eratosthenes, named after the Greek geographer and astronomer who lived from c. 276-194 BC. Eratosthenes…

  12. Exposing government response action contractors to environmental tort liability

    International Nuclear Information System (INIS)

    Roy, M.J.

    1991-01-01

    Government contractors, particularly those involved with hazardous waste response action activities, are encountering increased risks for environmental tort liabilities. Contracts often include tasks and work assignments requiring the management of industrial, chemical, nuclear or mining wastes, spent fuels, munitions or other toxic substances. Contractors exposure to liability for damages results directly from the environmental laws and regulations pursuant to which the Government has contracted them to respond. Additionally, contractors may be exposed to common law liability under such dogmas as nuisance, trespass and strict liability in tort

  13. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor...

    Science.gov (United States)

    2010-10-29

    ...-AG52 Defense Federal Acquisition Regulation Supplement (DFARS); Continuation of Essential Contractor... that contractors providing essential contractor services, as determined by the requiring activity..., implementing the requirements of DoDI 3020.37, Continuation of Essential DoD Contractor Services During Crises...

  14. 48 CFR 52.236-23 - Responsibility of the Architect-Engineer Contractor.

    Science.gov (United States)

    2010-10-01

    ... Architect-Engineer Contractor. 52.236-23 Section 52.236-23 Federal Acquisition Regulations System FEDERAL... Provisions and Clauses 52.236-23 Responsibility of the Architect-Engineer Contractor. As prescribed in 36.609-2(b), insert the following clause: Responsibility of the Architect-Engineer Contractor (APR 1984) (a...

  15. Collaboration in Long-Term Stewardship at DOE's Hanford Site - 13019

    International Nuclear Information System (INIS)

    Moren, Rick; Brown, David; Feist, Ella; Grindstaff, Keith; Zeisloft, Jamie

    2013-01-01

    ) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. (authors)

  16. Collaboration in Long-Term Stewardship at DOE's Hanford Site - 13019

    Energy Technology Data Exchange (ETDEWEB)

    Moren, Rick; Brown, David [Mission Support Alliance, LLC, Richland, WA (United States); Feist, Ella [Washington Closure Hanford, LLC, Richland WA (United States); Grindstaff, Keith; Zeisloft, Jamie [US Department of Energy, Richland Operations, Richland WA (United States)

    2013-07-01

    large parcel that includes one of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. (authors)

  17. Current Abstracts Nuclear Reactors and Technology

    Energy Technology Data Exchange (ETDEWEB)

    Bales, J.D.; Hicks, S.C. [eds.

    1993-01-01

    This publication Nuclear Reactors and Technology (NRT) announces on a monthly basis the current worldwide information available from the open literature on nuclear reactors and technology, including all aspects of power reactors, components and accessories, fuel elements, control systems, and materials. This publication contains the abstracts of DOE reports, journal articles, conference papers, patents, theses, and monographs added to the Energy Science and Technology Database during the past month. Also included are US information obtained through acquisition programs or interagency agreements and international information obtained through acquisition programs or interagency agreements and international information obtained through the International Energy Agency`s Energy Technology Data Exchange or government-to-government agreements. The digests in NRT and other citations to information on nuclear reactors back to 1948 are available for online searching and retrieval on the Energy Science and Technology Database and Nuclear Science Abstracts (NSA) database. Current information, added daily to the Energy Science and Technology Database, is available to DOE and its contractors through the DOE Integrated Technical Information System. Customized profiles can be developed to provide current information to meet each user`s needs.

  18. Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method

    Science.gov (United States)

    Alptekin, Orkun; Alptekin, Nesrin

    2017-10-01

    Selection of the most suitable contractor is an important process in public construction projects. This process is a major decision which may influence the progress and success of a construction project. Improper selection of contractors may lead to problems such as bad quality of work and delay in project duration. Especially in the construction projects of public buildings, the proper choice of contractor is beneficial to the public institution. Public procurement processes have different characteristics in respect to dissimilarities in political, social and economic features of every country. In Turkey, Turkish Public Procurement Law PPL 4734 is the main regulatory law for the procurement of the public buildings. According to the PPL 4734, public construction administrators have to contract with the lowest bidder who has the minimum requirements according to the criteria in prequalification process. Public administrators are not sufficient for selection of the proper contractor because of the restrictive provisions of the PPL 4734. The lowest bid method does not enable public construction administrators to select the most qualified contractor and they have realised the fact that the selection of a contractor based on lowest bid alone is inadequate and may lead to the failure of the project in terms of time delay Eand poor quality standards. In order to evaluate the overall efficiency of a project, it is necessary to identify selection criteria. This study aims to focus on identify importance of other criteria besides lowest bid criterion in contractor selection process of PPL 4734. In this study, a survey was conducted to staff of Department of Construction Works of Eskisehir Osmangazi University. According to TOPSIS (Technique for Order Preference by Similarity to the Ideal Solution) for analysis results, termination of construction work in previous tenders is the most important criterion of 12 determined criteria. The lowest bid criterion is ranked in rank 5.

  19. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  20. Concerning control of radiation exposure to workers in nuclear reactor facilities for testing and nuclear reactor facilities in research and development phase (fiscal 1987)

    International Nuclear Information System (INIS)

    1988-01-01

    A nuclear reactor operator is required by the Nuclear Reactor Control Law to ensure that the radiation dose to workers engaged in the operations of his nuclear reactor is controlled below the permissible exposure doses that are specified in notifications issued based on the Law. The present note briefly summarizes the data given in the Reports on Radiation Control, which have been submitted according to the Nuclear Reactor Control Law by the operators of nuclear reactor facilities for testing and those in the research and development phase, and the Reports on Control of Radiation Exposure to Workers submitted in accordance with the applicable administrative notices. According to these reports, the measured exposure to workers in 1987 were below the above-mentioned permissible exposure doses in all these nuclear facilities. The 1986 and 1987 measurements of radiation exposure dose to workers in nuclear reactor facilities for testing are tabulated. The measurements cover dose distribution among the facilities' personnel and workers of contractors. They also cover the total exposure dose for all workers in each of four plants operated under the Japan Atomic Energy Research Institute and the Power Reactor and Nuclear Fuel Development Corporation. (N.K.)

  1. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Energy Technology Data Exchange (ETDEWEB)

    Burdick, Arlan [IBACOS Inc., Pittsburgh, PA (United States)

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  2. Superficial Priming in Episodic Recognition

    Science.gov (United States)

    Dopkins, Stephen; Sargent, Jesse; Ngo, Catherine T.

    2010-01-01

    We explored the effect of superficial priming in episodic recognition and found it to be different from the effect of semantic priming in episodic recognition. Participants made recognition judgments to pairs of items, with each pair consisting of a prime item and a test item. Correct positive responses to the test item were impeded if the prime…

  3. 76 FR 50714 - Federal Acquisition Regulation; Documenting Contractor Performance; Correction

    Science.gov (United States)

    2011-08-16

    ... Regulation; Documenting Contractor Performance; Correction AGENCY: Department of Defense (DoD), General... August 9, 2011, regarding the proposed rule for Documenting Contractor Performance. DATES: The comment...

  4. Syntactic priming in American Sign Language.

    Science.gov (United States)

    Hall, Matthew L; Ferreira, Victor S; Mayberry, Rachel I

    2015-01-01

    Psycholinguistic studies of sign language processing provide valuable opportunities to assess whether language phenomena, which are primarily studied in spoken language, are fundamentally shaped by peripheral biology. For example, we know that when given a choice between two syntactically permissible ways to express the same proposition, speakers tend to choose structures that were recently used, a phenomenon known as syntactic priming. Here, we report two experiments testing syntactic priming of a noun phrase construction in American Sign Language (ASL). Experiment 1 shows that second language (L2) signers with normal hearing exhibit syntactic priming in ASL and that priming is stronger when the head noun is repeated between prime and target (the lexical boost effect). Experiment 2 shows that syntactic priming is equally strong among deaf native L1 signers, deaf late L1 learners, and hearing L2 signers. Experiment 2 also tested for, but did not find evidence of, phonological or semantic boosts to syntactic priming in ASL. These results show that despite the profound differences between spoken and signed languages in terms of how they are produced and perceived, the psychological representation of sentence structure (as assessed by syntactic priming) operates similarly in sign and speech.

  5. Highlights of contractor initiatives in quality enhancement and productivity improvement

    Science.gov (United States)

    1986-01-01

    The NASA/Contractor Team efforts are presented as part of NASA's continuing effort to facilitate the sharing of quality and productivity improvement ideas among its contractors. This complilation is not meant to be a comprehensive review of contractor initiative nor does it necessarily express NASA's views. The submissions represent samples from a general survey, and were not edited by NASA. The efforts are examples of quality and productivity programs in private industry, and as such, highlight company efforts in individual areas. Topics range from modernization of equipment, hardware, and technology to management of human resources. Of particular interest are contractor initiatives which deal with measurement and evaluation data pertaining to quality and productivity performance.

  6. Repetition Priming Magnitude Depends on Affirmative Prime Responses: A Test of Two Congruity Explanations.

    Science.gov (United States)

    Fiet, Paula; Sorensen, Linda; Mayne, Zachary; Corgiat, Damon; Woltz, Dan

    2016-01-01

    We conducted 2 experiments to evaluate the impact of positive prime responses on repetition priming effects while decoupling this impact from content congruity and specific evaluation operations. Our first experiment consisted of word-meaning comparison trials that required participants to evaluate synonyms or antonyms. A crossing of evaluation operation with semantic content allowed us to test the goal-content congruity hypothesis against the semantic congruity explanation for greater facilitation from positive response primes. Results suggested that operation-based priming is affected by goal-content congruity. A second experiment tested the observed effect of positive responses on repetition priming using mental rotation of irregular shapes, affording a test of the impact of congruity in evaluation goals and content in a nonverbal stimulus domain. Both experiments produced a pattern of results inconsistent with Schulman's (1974) semantic congruity account and instead implicated a different form of congruity that affects memory for prior operations rather than memory for semantic and episodic content.

  7. Complex architecture of primes and natural numbers.

    Science.gov (United States)

    García-Pérez, Guillermo; Serrano, M Ángeles; Boguñá, Marián

    2014-08-01

    Natural numbers can be divided in two nonoverlapping infinite sets, primes and composites, with composites factorizing into primes. Despite their apparent simplicity, the elucidation of the architecture of natural numbers with primes as building blocks remains elusive. Here, we propose a new approach to decoding the architecture of natural numbers based on complex networks and stochastic processes theory. We introduce a parameter-free non-Markovian dynamical model that naturally generates random primes and their relation with composite numbers with remarkable accuracy. Our model satisfies the prime number theorem as an emerging property and a refined version of Cramér's conjecture about the statistics of gaps between consecutive primes that seems closer to reality than the original Cramér's version. Regarding composites, the model helps us to derive the prime factors counting function, giving the probability of distinct prime factors for any integer. Probabilistic models like ours can help to get deeper insights about primes and the complex architecture of natural numbers.

  8. Medicare Administrative Contractor Performance Evaluation

    Data.gov (United States)

    U.S. Department of Health & Human Services — The Centers for Medicare and Medicaid Services (CMS) has compiled a summary of overall Medicare Administrative Contractor (MAC) performance information as measured...

  9. Report on Contractual Flow Down Provisions in the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS)

    Science.gov (United States)

    2017-11-01

    Each subcontract required non- disclosure agreements (NDAs) with the prime. 5 2. Flow-Down Clauses FAR/DFARS flow-down clauses derive from the...unusual for the prime contractor to only account for 10–20 percent of the total MDAP cost. Subcontractors—inclusive of basic parts and material suppliers...that feed the upper tiers of the supply chain— account for the bulk of the defense industrial base.7 MDAP prime contractors are often viewed as

  10. 48 CFR 852.236-72 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the....236-72 Performance of work by the contractor. As prescribed in 836.501, insert the following clause: Performance of Work by the Contractor (JUL 2002) The clause entitled “Performance of Work by the Contractor...

  11. Z(prime) Phenomenology and the LHC

    International Nuclear Information System (INIS)

    Rizzo, Thomas G.

    2006-01-01

    A brief pedagogical overview of the phenomenology of Z(prime) gauge bosons is ILC in determining Z(prime) properties is also discussed. and explore in detail how the LHC may discover and help elucidate the models, review the current constraints on the possible properties of a Z(prime) nature of these new particles. We provide an overview of the Z(prime) studies presented. Such particles can arise in various electroweak extensions of that have been performed by both ATLAS and CMS. The role of the the Standard Model (SM). We provide a quick survey of a number of Z(prime)

  12. Promethus Hot Leg Piping Concept

    International Nuclear Information System (INIS)

    AM Girbik; PA Dilorenzo

    2006-01-01

    The Naval Reactors Prime Contractor Team (NRPCT) recommended the development of a gas cooled reactor directly coupled to a Brayton energy conversion system as the Space Nuclear Power Plant (SNPP) for NASA's Project Prometheus. The section of piping between the reactor outlet and turbine inlet, designated as the hot leg piping, required unique design features to allow the use of a nickel superalloy rather than a refractory metal as the pressure boundary. The NRPCT evaluated a variety of hot leg piping concepts for performance relative to SNPP system parameters, manufacturability, material considerations, and comparison to past high temperature gas reactor (HTGR) practice. Manufacturability challenges and the impact of pressure drop and turbine entrance temperature reduction on cycle efficiency were discriminators between the piping concepts. This paper summarizes the NRPCT hot leg piping evaluation, presents the concept recommended, and summarizes developmental issues for the recommended concept

  13. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... management and HR concepts and approaches. Methodologically, a sample of the top level leaders of the hundred largest business units at some thirty Scandinavian contractors has been analysed. The focus is on the 400 top level managers in these organisations. On the basis of a desk study, an analysis of 124...

  14. Emerging Trends of the Owner-Contractor Relationship for Capital Facility Projects: From the Contractor Perspective

    National Research Council Canada - National Science Library

    Geertsema, Cameron

    2003-01-01

    .... Specifically, this document will focus on how the outcome of capital facility projects are affected by human resources practices, and the management principles and practices of the contractor-owner...

  15. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 1 (Adamsville, Alabama-Santa Clara, California).

    Science.gov (United States)

    1984-01-01

    FENCE CORP 379 379 AOUA-FAB SUPPLY COMPANY 59 59 ARIZONA ENGINE & PUMP CO 27 27 ARMOUR AND COMPANY 65 65 ARMOUR -DIAL INC 2,192 2,192 MPC911 PRIME...125 43 37 TOTAL - BERKELEY 16,734 3,230 9,893 1,658 861 125 967 BERRY CREEK INTERFACE TECHNOLOGY INC 33 33 BFERLWY HILLS ARMOUR OF AMERICA INC 25 25...PLEABANTON AVOSET FOOD CORP 27 27 FEDERAL PRISON IND DRAPES 121 121 FEDERAL PRISON INDUSTRIES INC 284 56 200 28 FORD LABORATORIES 87 87 GENERAL ELECTRIC

  16. Westinghouse Savannah River Company (WSRC) approach to nuclear facility maintenance

    International Nuclear Information System (INIS)

    Harrison, D.W.

    1991-01-01

    The Savannah River Site (SRS) in South Carolina is a 300+ square mile facility owned by the US Department of Energy (DOE) and operated by Westinghouse Savannah River Company (WSRC), the prime contractor; Bechtel Savannah River, Incorporated (BSRI) is a major subcontractor. The site has used all of the five nuclear reactors and it has the necessary nuclear materials processing facilities, as well as waste management and research facilities. The site has produced materials for the US nuclear arsenal and various isotopes for use in space research and nuclear medicine for more than 30 years. In 1989, WSRC took over as prime contractor, replacing E.I. du Pont de Nemours and Company. At this time, a concentrated effort began to more closely align the operating standards of this site with those accepted by the commercial nuclear industry of the United States. Generally, this meant acceptance of standards of the Institute of Nuclear Power Operations (INPO) for nuclear-related facilities at the site. The subject of this paper is maintenance of nuclear facilities and, therefore, excludes discussion of the maintenance of non-nuclear facilities and equipment

  17. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  18. 77 FR 51783 - Federal Acquisition Regulation; Information Collection; Contractors' Purchasing Systems Reviews

    Science.gov (United States)

    2012-08-27

    ...; Information Collection; Contractors' Purchasing Systems Reviews AGENCY: Department of Defense (DOD), General... collection requirement concerning contractors' purchasing systems reviews. Public comments are particularly... Information Collection 9000- 0132, Contractors' Purchasing Systems Reviews, by any of the following methods...

  19. 76 FR 60837 - Federal Acquisition Regulation; Information Collection; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-09-30

    ...; Information Collection; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... concerning contractor business ethics compliance program and disclosure requirements. Public comments are... Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements, by any of...

  20. Transposed-letter priming of prelexical orthographic representations.

    Science.gov (United States)

    Kinoshita, Sachiko; Norris, Dennis

    2009-01-01

    A prime generated by transposing two internal letters (e.g., jugde) produces strong priming of the original word (judge). In lexical decision, this transposed-letter (TL) priming effect is generally weak or absent for nonword targets; thus, it is unclear whether the origin of this effect is lexical or prelexical. The authors describe the Bayesian Reader theory of masked priming (D. Norris & S. Kinoshita, 2008), which explains why nonwords do not show priming in lexical decision but why they do in the cross-case same-different task. This analysis is followed by 3 experiments that show that priming in this task is not based on low-level perceptual similarity between the prime and target, or on phonology, to make the case that priming is based on prelexical orthographic representation. The authors then use this task to demonstrate equivalent TL priming effects for nonwords and words. The results are interpreted as the first reliable evidence based on the masked priming procedure that letter position is not coded absolutely within the prelexical, orthographic representation. The implications of the results for current letter position coding schemes are discussed.

  1. Wrath of God: religious primes and punishment.

    Science.gov (United States)

    McKay, Ryan; Efferson, Charles; Whitehouse, Harvey; Fehr, Ernst

    2011-06-22

    Recent evidence indicates that priming participants with religious concepts promotes prosocial sharing behaviour. In the present study, we investigated whether religious priming also promotes the costly punishment of unfair behaviour. A total of 304 participants played a punishment game. Before the punishment stage began, participants were subliminally primed with religion primes, secular punishment primes or control primes. We found that religious primes strongly increased the costly punishment of unfair behaviours for a subset of our participants--those who had previously donated to a religious organization. We discuss two proximate mechanisms potentially underpinning this effect. The first is a 'supernatural watcher' mechanism, whereby religious participants punish unfair behaviours when primed because they sense that not doing so will enrage or disappoint an observing supernatural agent. The second is a 'behavioural priming' mechanism, whereby religious primes activate cultural norms pertaining to fairness and its enforcement and occasion behaviour consistent with those norms. We conclude that our results are consistent with dual inheritance proposals about religion and cooperation, whereby religions harness the byproducts of genetically inherited cognitive mechanisms in ways that enhance the survival prospects of their adherents.

  2. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  3. As prime minister during the Fukushima crisis; Als Premierminister waehrend der Fukushima-Krise

    Energy Technology Data Exchange (ETDEWEB)

    Kan, Naoto

    2015-07-01

    Naoto Kan was the acting Japanese Prime Minister during the Tohoku earthquake and the resulting Fukushima reactor accident. After demission in September 2011 he decided to document the facts according to his knowledge and the memorized thoughts during the course of the accident, his decision making and his own emotions. The first chapter covers the daily documentation until March 19th, the second chapter deals with nuclear power phaseout and Kan's demission, the third chapter covers the issues nuclear power phaseout - politics - citizens.

  4. Recognizing Plant Defense Priming

    NARCIS (Netherlands)

    Martinez-Medina, Ainhoa; Flors, Victor; Heil, Martin; Mauch-Mani, Brigitte; Pieterse, Corné M J|info:eu-repo/dai/nl/113115113; Pozo, Maria J; Ton, Jurriaan; van Dam, Nicole M; Conrath, Uwe

    2016-01-01

    Defense priming conditions diverse plant species for the superinduction of defense, often resulting in enhanced pest and disease resistance and abiotic stress tolerance. Here, we propose a guideline that might assist the plant research community in a consistent assessment of defense priming in

  5. Recognizing plant defense priming

    NARCIS (Netherlands)

    Martinez-Medina, A.; Flors, V.; Heil, M.; Mauch-Mani, B.; Pieterse, C.M.J.; Pozo, M.J.; Ton, J.; Van Dam, N.M.; Conrath, U.

    2016-01-01

    Defense priming conditions diverse plant species for the superinduction of defense, often resulting in enhanced pest and disease resistance and abiotic stress tolerance. Here, we propose a guideline that might assist the plant research community in a consistent assessment of defense priming in

  6. Syntactic priming in American Sign Language.

    Directory of Open Access Journals (Sweden)

    Matthew L Hall

    Full Text Available Psycholinguistic studies of sign language processing provide valuable opportunities to assess whether language phenomena, which are primarily studied in spoken language, are fundamentally shaped by peripheral biology. For example, we know that when given a choice between two syntactically permissible ways to express the same proposition, speakers tend to choose structures that were recently used, a phenomenon known as syntactic priming. Here, we report two experiments testing syntactic priming of a noun phrase construction in American Sign Language (ASL. Experiment 1 shows that second language (L2 signers with normal hearing exhibit syntactic priming in ASL and that priming is stronger when the head noun is repeated between prime and target (the lexical boost effect. Experiment 2 shows that syntactic priming is equally strong among deaf native L1 signers, deaf late L1 learners, and hearing L2 signers. Experiment 2 also tested for, but did not find evidence of, phonological or semantic boosts to syntactic priming in ASL. These results show that despite the profound differences between spoken and signed languages in terms of how they are produced and perceived, the psychological representation of sentence structure (as assessed by syntactic priming operates similarly in sign and speech.

  7. Multisensory Flavor Priming

    DEFF Research Database (Denmark)

    Dijksterhuis, Garmt Bernard

    2016-01-01

    with a taxonomy of different priming situations. In food-related applications of flavor, both bottom-up (sensory) as well as top-down (expectations) processes are at play. Most of the complex interactions that this leads to take place outside the awareness of the perceiving subject. A model is presented where...... many, past and current, aspects (sensory, surroundings, social, somatic, sentimental) of a (flavor) perception, together result in the perception of a flavor, its liking. or its choice. This model borrows on ideas from priming, situated/embodied cognition, and (food-related) perception.......Flavor is multisensory; several interacting sensory systems-taste, smell, and mouthfeel-together comprise "flavor," making it a cognitively constructed percept rather than a bottom-up sensory one. In this chapter, some of the complications this entails for flavor priming are introduced, along...

  8. 78 FR 59851 - Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ...-AH97 Defense Federal Acquisition Regulation Supplement: Enhancement of Contractor Employee... contractor and subcontractor employees. DATES: Effective date: September 30, 2013. In accordance with FAR 1... Whistleblower Protections for Contractor Employees) made extensive changes to 10 U.S.C. 2409, entitled...

  9. Contractors on the Battlefield: What Have We Signed Up For?

    National Research Council Canada - National Science Library

    Zamparelli, Steven

    1999-01-01

    The role of contractors in warfare has changed dramatically. As the Services have drawn down, more and more of the duties formerly accomplished by military members are being performed by contractors...

  10. Semantic priming, not repetition priming, is to blame for false hearing.

    Science.gov (United States)

    Rogers, Chad S

    2017-08-01

    Contextual and sensory information are combined in speech perception. Conflict between the two can lead to false hearing, defined as a high-confidence misidentification of a spoken word. Rogers, Jacoby, and Sommers (Psychology and Aging, 27(1), 33-45, 2012) found that older adults are more susceptible to false hearing than are young adults, using a combination of semantic priming and repetition priming to create context. In this study, the type of context (repetition vs. sematic priming) responsible for false hearing was examined. Older and young adult participants read and listened to a list of paired associates (e.g., ROW-BOAT) and were told to remember the pairs for a later memory test. Following the memory test, participants identified words masked in noise that were preceded by a cue word in the clear. Targets were semantically associated to the cue (e.g., ROW-BOAT), unrelated to the cue (e.g., JAW-PASS), or phonologically related to a semantic associate of the cue (e.g., ROW-GOAT). How often each cue word and its paired associate were presented prior to the memory test was manipulated (0, 3, or 5 times) to test effects of repetition priming. Results showed repetitions had no effect on rates of context-based listening or false hearing. However, repetition did significantly increase sensory information as a basis for metacognitive judgments in young and older adults. This pattern suggests that semantic priming dominates as the basis for false hearing and highlights context and sensory information operating as qualitatively different bases for listening and metacognition.

  11. Modified Multi Prime RSA Cryptosystem

    Science.gov (United States)

    Ghazali Kamardan, M.; Aminudin, N.; Che-Him, Norziha; Sufahani, Suliadi; Khalid, Kamil; Roslan, Rozaini

    2018-04-01

    RSA [1] is one of the mostly used cryptosystem in securing data and information. Though, it has been recently discovered that RSA has some weaknesses and in advance technology, RSA is believed to be inefficient especially when it comes to decryption. Thus, a new algorithm called Multi prime RSA, an extended version of the standard RSA is studied. Then, a modification is made to the Multi prime RSA where another keys is shared secretly between the receiver and the sender to increase the securerity. As in RSA, the methodology used for modified Multi-prime RSA also consists of three phases; 1. Key Generation in which the secret and public keys are generated and published. In this phase, the secrecy is improved by adding more prime numbers and addition of secret keys. 2. Encryption of the message using the public and secret keys given. 3. Decryption of the secret message using the secret key generated. For the decryption phase, a method called Chinese Remainder Theorem is used which helps to fasten the computation. Since Multi prime RSA use more than two prime numbers, the algorithm is more efficient and secure when compared to the standard RSA. Furthermore, in modified Multi prime RSA another secret key is introduced to increase the obstacle to the attacker. Therefore, it is strongly believed that this new algorithm is better and can be an alternative to the RSA.

  12. The pros and cons of masked priming.

    Science.gov (United States)

    Forster, K I

    1998-03-01

    Masked priming paradigms offer the promise of tapping automatic, strategy-free lexical processing, as evidenced by the lack of expectancy disconfirmation effects, and proportionality effects in semantic priming experiments. But several recent findings suggest the effects may be prelexical. These findings concern nonword priming effects in lexical decision and naming, the effects of mixed-case presentation on nonword priming, and the dependence of priming on the nature of the distractors in lexical decision, suggesting possible strategy effects. The theory underlying each of these effects is discussed, and alternative explanations are developed that do not preclude a lexical basis for masked priming effects.

  13. 75 FR 55577 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-13

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9200-8] Clean Water Act; Contractor Access to Confidential... Recovery Act (RCRA). Transfer of the information will allow the contractor and subcontractors to access... contractors and subcontractors over the history of the effluent guidelines program. EPA determined that this...

  14. 75 FR 82575 - Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel

    Science.gov (United States)

    2010-12-30

    ... 9000-AL60 Federal Acquisition Regulation; Personal Identity Verification of Contractor Personnel AGENCY... requirement of collecting from contractors all forms of Government-provided identification once they are no...D Inspector General Audit Report No. D-2009-005, entitled ``Controls Over the Contractor Common...

  15. 77 FR 60962 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2012-10-05

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 2 [FRL-9733-8] Clean Water Act; Contractor Access to... transfer of confidential business information to contractor, subcontractors, and consultants. SUMMARY: The... certain industries. We have determined that the contractors listed below require access [[Page 60963

  16. 77 FR 51496 - Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems

    Science.gov (United States)

    2012-08-24

    ... Federal Acquisition Regulation; Basic Safeguarding of Contractor Information Systems AGENCY: Department of... Acquisition Regulation (FAR) to add a new subpart and contract clause for the basic safeguarding of contractor... information) that will be resident on or transiting through contractor information systems. DATES: Interested...

  17. 75 FR 60452 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2010-09-30

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9208-9] Clean Water Act; Contractor Access to Confidential... electric industry to a new subcontractor of a contractor, Eastern Research Group (ERG). EPA previously... contractors and subcontractors to access information necessary to support EPA in the planning, development...

  18. 76 FR 4343 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-01-25

    ...; Contractor Conflicts of Interest AGENCY: Environmental Protection Agency. ACTION: Notice. SUMMARY: In... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors... cleanup and enforcement and because its contractors are often involved in both activities, it is...

  19. 76 FR 81490 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-12-28

    ... Activities; Proposed Collection; Comment Request; Contractor Cumulative Claim and Reconciliation (Renewal... identify the Docket ID Number EPA-HQ-OARM-2011-0997, Contractor Cumulative Claim and Reconciliation. Hand... information collection activity or ICR does this apply to? Affected entities: All contractors who have...

  20. The main factor affecting the competitiveness of Contractor Company

    Science.gov (United States)

    Nurisra; Malahayati, Nurul; Mahmuddin

    2018-05-01

    Contractor companies must have the competitive advantage to compete in maintaining the survival of the company. Problems arise because quite a lot of advantages can be used and these advantages must be used appropriately to produce competitiveness for the company to continue to compete and to win the competition. This study aims to determine the main factors affecting the competitiveness of medium-class contractors in Banda Aceh. Data collection was obtained through questionnaires distributed to 31 middle-class contractors in Banda Aceh. Data processing and analysis is done by using descriptive analysis. Based on the result of descriptive analysis, it can be concluded that the most important competitiveness factor with a mean score value 4.52 is the relationship, and the factor that has the highest mean score value is the relationship with the government of 4.97, while the result of the ranking analysis is obtained 25 factor that is critical to the competitiveness of medium-class contractors in Banda Aceh.

  1. ACED Federal Grant Contractor Tracking

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Dataset includes grant, project, and contractor awarded which are tracked for ensuring Davis-Bacon Act compliance where applicable. The 1931 Davis-Bacon Act...

  2. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  3. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-10-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor`s status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  4. 76 FR 20661 - Agency Information Collection Activities; Proposed Collection; Comment Request; Contractor...

    Science.gov (United States)

    2011-04-13

    ... Activities; Proposed Collection; Comment Request; Contractor Conflicts of Interest AGENCY: Environmental....regulations.gov . Title: Contractor Conflicts of Interest. ICR numbers: EPA ICR No. 1550.09, OMB Control No... control numbers in certain EPA regulations is consolidated in 40 CFR part 9. Abstract: EPA contractors...

  5. 78 FR 79692 - Clean Water Act; Contractor Access to Confidential Business Information

    Science.gov (United States)

    2013-12-31

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9904-94-OW] Clean Water Act; Contractor Access to... Transfer of Confidential Business Information to Contractor, Subcontractors, and Consultants. SUMMARY: The... contractors listed below require access to CBI submitted to EPA under Section 308 of the Clean Water Act (CWA...

  6. Priming Ability Emotional Intelligence

    Science.gov (United States)

    Schutte, Nicola S.; Malouff, John M.

    2012-01-01

    Two studies examined whether priming self-schemas relating to successful emotional competency results in better emotional intelligence performance. In the first study participants were randomly assigned to a successful emotional competency self-schema prime condition or a control condition and then completed an ability measure of emotional…

  7. Contingency Contractor Optimization Phase 3 Sustainment Database Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Frazier, Christopher Rawls; Durfee, Justin David; Bandlow, Alisa; Gearhart, Jared Lee; Jones, Katherine A

    2016-05-01

    The Contingency Contractor Optimization Tool – Prototype (CCOT-P) database is used to store input and output data for the linear program model described in [1]. The database allows queries to retrieve this data and updating and inserting new input data.

  8. Psychotherapy augmentation through preconscious priming

    Directory of Open Access Journals (Sweden)

    Francois eBorgeat

    2013-03-01

    Full Text Available Objective: To test the hypothesis that repeated preconscious (masked priming of personalized positive cognitions could augment cognitive change and facilitate achievement of patients’ goals following a therapy.Methods: Twenty social phobic patients (13 women completed a 36 weeks study beginning by 12 weeks of group behavioural therapy. After the therapy, they received 6 weeks of preconscious priming and 6 weeks of a control procedure in a randomized cross-over design. The Priming condition involved listening twice daily with a passive attitude to a recording of individualized formulations of appropriate cognitions and attitudes masked by music. The Control condition involved listening to an indistinguishable recording where the formulations had been replaced by random numbers. Changes in social cognitions were measured by the Social Interaction Self Statements Test (SISST.Results: Patients improved following therapy. The Priming procedure was associated with increased positive cognitions and decreased negative cognitions on the SISST while the Control procedure was not. The Priming procedure induced more cognitive change when applied immediately after the group therapy. Conclusion: An effect of priming was observed on social phobia related cognitions in the expected direction. This self administered addition to a therapy could be seen as an augmentation strategy.

  9. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  10. Prime time news: the influence of primed positive and negative emotion on susceptibility to false memories.

    Science.gov (United States)

    Porter, Stephen; ten Brinke, Leanne; Riley, Sean N; Baker, Alysha

    2014-01-01

    We examined the relation between emotion and susceptibility to misinformation using a novel paradigm, the ambiguous stimuli affective priming (ASAP) paradigm. Participants (N = 88) viewed ambiguous neutral images primed either at encoding or retrieval to be interpreted as either highly positive or negative (or neutral/not primed). After viewing the images, they either were asked misleading or non-leading questions. Following a delay, memory accuracy for the original images was assessed. Results indicated that any emotional priming at encoding led to a higher susceptibility to misinformation relative to priming at recall. In particular, inducing a negative interpretation of the image at encoding led to an increased susceptibility of false memories for major misinformation (an entire object not actually present in the scene). In contrast, this pattern was reversed when priming was used at recall; a negative reinterpretation of the image decreased memory distortion relative to unprimed images. These findings suggest that, with precise experimental control, the experience of emotion at event encoding, in particular, is implicated in false memory susceptibility.

  11. 48 CFR 307.108-70 - Telecommuting of contractor employees.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Telecommuting of... Telecommuting of contractor employees. (a) SOWs/PWSs shall permit offerors or contractors to specify their own... telecommuting) for any part of an SOW/PWS, after determining that the work or any portion thereof must be...

  12. 23 CFR 635.110 - Licensing and qualification of contractors.

    Science.gov (United States)

    2010-04-01

    ... licensing contractors, who may bid for, be awarded, or perform Federal-aid highway contracts, shall be... competition, to prevent submission of a bid by, or to prohibit the consideration of a bid submitted by, any...) No contractor shall be required by law, regulation, or practice to obtain a license before submission...

  13. Change of nuclear reactor installation in the first nuclear ship of Japan Nuclear Ship Development Agency

    International Nuclear Information System (INIS)

    1979-01-01

    The written application concerning the change of nuclear reactor installation in the first nuclear ship was presented from the JNSDA to the prime minister on January 10, 1979. The contents of the change are the repair of the primary and secondary shields of the reactor, the additional installation of a storage tank for liquid wastes, and the extension of the period to stop the reactor in cold state. The inquiry from the prime minister to the Nuclear Safety Commission was made on June 9, 1979, through the examination of safety in the Nuclear Safety Bureau, Science and Technology Agency. The Nuclear Safety Commission instructed to the Committee for the Examination of Nuclear Reactor Safety on June 11, 1979, about the application of criteria stipulated in the law. The relevant letters and the drafts of examination papers concerning the technical capability and the safety in case of the change of nuclear reactor installation in the first nuclear ship are cited. The JNSDA and Sasebo Heavy Industries, Ltd. seem to have the sufficient technical capability to carry out this change. As the result of examination, it is recognized that the application presented by the JNSDA is in compliance with the criteria stipulated in the law concerning the regulation of nuclear raw materials, nuclear fuel materials and nuclear reactors. (Kako, I.)

  14. Cross-national research on contractor evaluation procedures in public works procurement

    Science.gov (United States)

    Kinoshita, Seiya; Sato, Naoyoshi; Matsumoto, Naoya

    Contractor evaluation methods in Japan's public works procurement, beginning with construction business licensure, going through biennial preliminary firm rating, up to project-by-project prequalification and comprehensive point rating, were developed during the period when public works were mostly procured through designated competitive bidding. It is essential to focus attention on contractor evaluation methods for introducing different types of procurement procedures which enhance the use of technological capabilities held by private businesses. An overall review of contractor evaluation procedures should be conducted in view of the present situation, where the open competitive bidding has become mainly used in combination with comprehensive evaluation, as well as to allow for further diversification of procurement methods. In Western countries, improvements have been made for the past several years in contractor evaluation procedures with more emphasis on "Value for Money." Advanced efforts made by these countries will be useful as a reference for overhauling Japan's contractor evaluation system. This study conducts a comparative review of contractor evaluation procedures for public procurement in Western countries such as the United States, the United Kingdom and France by identifying similarities and differences between those of Japan and the above mentioned countries. This reveals that a contractor's technical or professional ability is looked at separately from its economic and financial standing in those countries studied, and there is no case like Japan in which those two factors are integrated into one for evaluation.

  15. Space-Valence Priming with Subliminal and Supraliminal Words

    Directory of Open Access Journals (Sweden)

    Ulrich eAnsorge

    2013-02-01

    Full Text Available To date it is unclear whether (1 awareness-independent non-evaluative semantic processes influence affective semantics and whether (2 awareness-independent affective semantics influence non-evaluative semantic processing. In the current study, we investigated these questions with the help of subliminal (masked primes and visible targets in a space-valence across-category congruence effect. In line with (1, we found that subliminal space prime words influenced valence classification of supraliminal target words (Experiment 1: Classifications were faster with a congruent prime (e.g., the prime ‘up’ before the target ‘happy’ than with an incongruent prime (e.g., the prime ‘up’ before the target ‘sad’. In contrast to (2, no influence of subliminal valence primes on the classification of supraliminal space targets into up- and down-words was found (Experiment 2. Control conditions showed that standard masked response-priming effects were found with both subliminal prime types, and that an across-category congruence effect was also found with supraliminal valence primes and spatial target words. The final Experiment 3 confirmed that the across-category congruence effect indeed reflected priming of target categorization of a relevant meaning category. Together, the data jointly confirmed prediction (1 that awareness-independent non-evaluative semantic priming influences valence judgments.

  16. Space reactors - past, present, and future

    International Nuclear Information System (INIS)

    Buden, D.; Angelo, J.A.

    1983-01-01

    The successful test flights of the Space Shuttle mark the start of a new era--an era of routine manned access into cislunar space. Human technical development at the start of the next Millenium will be highlighted by the creation of Man's extraterrestrial civilization with off-planet expansion of the human resource base. In the 1990s and beyond, advanced-design nuclear reactors could represent the prime source of both space power and propulsion. Many sophisticated military and civilian space missions of the future will require first kilowatt and then megawatt levels of power. This paper reviews key technology developments that accompanied past US space nuclear power development efforts, describes on-going programs, and then explores reactor technologies that will satisfy megawatt power level needs and beyond

  17. Contingency Contractor Optimization Phase 3 Sustainment Third-Party Software List - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa

    2016-05-01

    The Contingency Contractor Optimization Tool - Prototype (CCOT-P) requires several third-party software packages. These are documented below for each of the CCOT-P elements: client, web server, database server, solver, web application and polling application.

  18. Selection of disposal contractor by multi criteria decision making methods

    Directory of Open Access Journals (Sweden)

    Cenker Korkmazer

    2016-08-01

    Full Text Available Hazardous waste is substance that threaten people and environment in case of improper storage, disposal and transport due to its concentration, physical and chemical properties. Companies producing hazardous waste as a result of several activities mostly do not have any own disposal facilities. In addition, they do not pay attention enough to determine the right contractor as a disposal facility. On the other hand, there are various qualitative and quantitative criteria affecting the selection of the contractor and conflicting with each other. The aim of the performed study is to assist one of these companies producing hazardous waste in the selection of the best contractor that eliminates hazardous waste economic and harmless way. In the study, contractor weights in percentage is calculated by using Analytic Network Process (ANP as one of the multi-criteria decision making (MCDM methods and widely used in the literature which considers both qualitative and quantitative criteria. In the next step, by the help of the mathematical model, contractors that will be given which type of hazardous waste are identified. This integrated approach can be used as a guide for similar firms.

  19. Innovation Strategy in Slovak Forest Contractor Firms—A SWOT Analysis

    Directory of Open Access Journals (Sweden)

    Martina Štěrbová

    2016-05-01

    Full Text Available The aim of the study is to determine the innovation strategy of contractor firms in the Slovak forestry service sector in the area of further innovation activities development. The strategy identification was based on the analysis of the strengths, weaknesses, opportunities and threats in this sector. The results indicate that weaknesses of contractor firms exceed their strengths and, considering the degree and importance of their impact, opportunities exceed identified threats. Based on these findings revealing the relations in the area of innovation activities of forestry service contractors, the “Strategy of Partnership” was suggested as the most suitable type of strategy. It can be concluded that such a form of grouping cooperation brings many benefits to contractors in the form of information availability, guidance, training, and management of conflicts, risks and uncertainty, which are associated with the innovation process.

  20. Building Numbers from Primes

    Science.gov (United States)

    Burkhart, Jerry

    2009-01-01

    Prime numbers are often described as the "building blocks" of natural numbers. This article shows how the author and his students took this idea literally by using prime factorizations to build numbers with blocks. In this activity, students explore many concepts of number theory, including the relationship between greatest common factors and…

  1. Recognizing Plant Defense Priming.

    Science.gov (United States)

    Martinez-Medina, Ainhoa; Flors, Victor; Heil, Martin; Mauch-Mani, Brigitte; Pieterse, Corné M J; Pozo, Maria J; Ton, Jurriaan; van Dam, Nicole M; Conrath, Uwe

    2016-10-01

    Defense priming conditions diverse plant species for the superinduction of defense, often resulting in enhanced pest and disease resistance and abiotic stress tolerance. Here, we propose a guideline that might assist the plant research community in a consistent assessment of defense priming in plants. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. 77 FR 17098 - Proposed Extension of Existing Information Collection; Independent Contractor Registration and...

    Science.gov (United States)

    2012-03-23

    ... Information Collection; Independent Contractor Registration and Identification AGENCY: Mine Safety and Health...-00040, Independent Contractor Register. OMB last approved this information collection request (ICR) on...); or 202-693-9441 (facsimile). SUPPLEMENTARY INFORMATION: I. Background Independent contractors...

  3. The structure factor of primes

    Science.gov (United States)

    Zhang, G.; Martelli, F.; Torquato, S.

    2018-03-01

    Although the prime numbers are deterministic, they can be viewed, by some measures, as pseudo-random numbers. In this article, we numerically study the pair statistics of the primes using statistical-mechanical methods, particularly the structure factor S(k) in an interval M ≤slant p ≤slant M + L with M large, and L/M smaller than unity. We show that the structure factor of the prime-number configurations in such intervals exhibits well-defined Bragg-like peaks along with a small ‘diffuse’ contribution. This indicates that primes are appreciably more correlated and ordered than previously thought. Our numerical results definitively suggest an explicit formula for the locations and heights of the peaks. This formula predicts infinitely many peaks in any non-zero interval, similar to the behavior of quasicrystals. However, primes differ from quasicrystals in that the ratio between the location of any two predicted peaks is rational. We also show numerically that the diffuse part decays slowly as M and L increases. This suggests that the diffuse part vanishes in an appropriate infinite-system-size limit.

  4. Radiation exposures for DOE and DOE contractor employees, 1989

    International Nuclear Information System (INIS)

    Smith, M.H.; Eschbach, P.A.; Harty, R.; Millet, W.H.; Scholes, V.A.

    1992-12-01

    All US Department of Energy (DOE) and DOE contractors, are required to submit occupational radiation exposure records to a central depository. In 1989, data were required to be submitted for all employees who were required to be monitored in accordance with DOE Order 5480.11 and for all visitors who had a positive exposure. The data required included the external penetrating whole-body dose equivalent, the shallow dose equivalent, and a summary of internal depositions of radioactive material above specified limits. Data regarding the exposed individuals included the individual's age, sex, and occupational category. This report is a summary of the external penetrating whole-body dose equivalents and shallow dose equivalents reported by DOE and DOE contractors for the calendar year 1989. A total of 90,882 DOE and DOE contractor employees were reported to have been monitored for whole-body ionizing radiation exposure during 1989. This represents 53.6% of all DOE and DOE contractor employees and is an increase (4.3 %) from the number of monitored employees for 1988. In addition to the employees, 12,643 visitors were monitored

  5. EDRP public local inquiry, UKAEA/BNFL precognition on: Contractor accommodation

    International Nuclear Information System (INIS)

    Scott, W.

    1986-01-01

    The availability of accommodation for contractors working on the proposed EDRP at Dounreay is discussed. It is predicted that the contractors could be accommodated without the need for special arrangement and with no adverse effect on the tourist industry. (U.K.)

  6. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    International Nuclear Information System (INIS)

    Bodie, J.S.; Haymour, J.

    1999-01-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts

  7. Drawing the critical distinction between independent contractors and permanent employees : the tax implications

    Energy Technology Data Exchange (ETDEWEB)

    Bodie, J.S.; Haymour, J. [Fraser Milner, Calgary, AB (Canada)

    1999-07-01

    The many factors that should be considered when distinguishing between an independent contractor and an employee from the perspective of tax laws were discussed. Some of the major areas where disputes regarding relationships between the employee and the independent contractor arise were reviewed with particular emphasis on some of the dangers associated with a change in characterization of these types of relationships. Ways in which to guard against these dangers were also presented. The courts have established the following four tests to determine a contractor's status: (1) the control test, (2) the economic reality test, (3) the business integration test, and (4) the ownership of tools test. The control tests looks to the degree of control that an employer/recipient of services possesses over the work that is to be performed. The economic reality test looks to whether the contractor is actually in business for himself and is risking a loss. The business integration test examines the relationship between employer and contractor in terms of how economically dependent the contractor is on the employer and whether the task the contractor carries on forms an integral part of the business of the employer. The last test examines who owns the tools used by the contractor to carry out his duties. This presentation also reviewed how employers and contractors are responsible for adhering to Revenue Canada tax laws and certain liabilities regarding income taxes, Employment Insurance (EI) premiums, Canada Pension Plan (CPP) contributions and other amounts.

  8. PrimeFaces beginner's guide

    CERN Document Server

    Reddy, K Siva Prasad

    2013-01-01

    A guide for beginner's with step-by-step instructions and an easy-to-follow approach.PrimeFaces Beginners Guide is a simple and effective guide for beginners, wanting to learn and implement PrimeFaces in their JSF-based applications. Some basic JSF and jQuery skills are required before you start working through the book.

  9. 32 CFR 806b.6 - Systems of records operated by a contractor.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...

  10. Integrating Contractors into the Logistics Force

    National Research Council Canada - National Science Library

    Terrell, Ronald G

    2006-01-01

    ... a panacea. For a combatant commander to effectively integrate them with his military force requires an understanding of the operational environment, contractor capabilities, acceptable levels of risk...

  11. Private Military and Security Contractors

    DEFF Research Database (Denmark)

    In Private Military and Security Contractors: Controlling the Corporate Warrior a multinational team of 16 scholars and a practitioner from political science, sociology, and law address a developing phenomenon: controlling the use of privatized force by states in international politics. Robust...

  12. Semantic priming without association: a meta-analytic review.

    Science.gov (United States)

    Lucas, M

    2000-12-01

    A meta-analysis of 26 studies indicated that automatic semantic priming can occur without association. Priming did not vary substantially with differences in variables that affect automatic versus strategic processing, such as time spent processing the prime and target, relationship proportion, and task (except that average effects were smaller in the naming task). Although category coordinates were investigated in the majority of studies, synonyms, antonyms, and script relations also demonstrated priming; functional relations showed greater priming, and essential and perceptual relations showed less. The average effect size for semantic priming was smaller than that for associative priming, suggesting that there is an "associative boost" from adding an associative relationship to a semantic one. The implications of these findings for the modularity thesis and for models of semantic priming are discussed.

  13. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  14. Decontamination and decommissioning of the JANUS reactor at the Argonne National Laboratory-East site

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Garlock, G.A.

    1997-05-01

    Argonne National Laboratory has begun the decontamination and decommissioning (D ampersand D) of the JANUS Reactor Facility. The project is managed by the Technology Development Division's D ampersand D Program personnel. D ampersand D procedures are performed by sub-contractor personnel. Specific activities involving the removal, size reduction, and packaging of radioactive components and facilities are discussed

  15. Fusion Reactor Safety Research Program annual report, FY-79

    International Nuclear Information System (INIS)

    Crocker, J.G.; Cohen, S.

    1980-08-01

    The objective of the program is the development, coordination, and execution of activities related to magnetic fusion devices and reactors that will: (a) identify and evaluate potential hazards, (b) assess and disclose potential environmental impacts, and (c) develop design standards and criteria that eliminate, mitigate, or reduce those hazards and impacts. The program will provide a sound basis for licensing fusion reactors. Included in this report are portions of four reports from two outside contractors, discussions of the several areas in which EG and G Idaho is conducting research activities, a discussion of proposed program plan development, mention of special tasks, a review of fusion technology program coordination by EG and G with other laboratories, and a brief view of proposed FY-80 activities

  16. 48 CFR 252.237-7023 - Continuation of Essential Contractor Services.

    Science.gov (United States)

    2010-10-01

    ... provide a written plan for continuing the performance of essential contractor services identified in...; and (v) The approach for communicating expectations to contractor employees regarding their roles and... or other designated representative as expeditiously as possible and use its best efforts to cooperate...

  17. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  18. Priming methods in semantics and pragmatics.

    Science.gov (United States)

    Maldonado, Mora; Spector, Benjamin; Chemla, Emmanuel

    2017-01-01

    Structural priming is a powerful method to inform linguistic theories. We argue that this method extends nicely beyond syntax to theories of meaning. Priming, however, should still be seen as only one of the tools available for linguistic data collection. Specifically, because priming can occur at different, potentially conflicting levels, it cannot detect every aspect of linguistic representations.

  19. The Inadequacy of Existing Far Provisions to Ensure Contractor Environmental Compliance

    National Research Council Canada - National Science Library

    MacDonald, Edward

    1997-01-01

    This thesis focuses on situations where the obligation is on the contractor, and examines the existing FAR provisions and clauses to explore whether they are adequate to ensure government contractor...

  20. 75 FR 71564 - Defense Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS...

    Science.gov (United States)

    2010-11-24

    ... Federal Acquisition Regulation Supplement; Contractor Insurance/Pension Review (DFARS Case 2009-D025... conducting a Contractor Insurance/Pension Review from Procedures, Guidance, and Information (PGI) to the... This final rule relocates requirements for Contractor Insurance/ Pension Review to DFARS 242.7302 from...

  1. 78 FR 60169 - Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee...

    Science.gov (United States)

    2013-09-30

    ... 9000-AM56 Federal Acquisition Regulation; Pilot Program for Enhancement of Contractor Employee... program enhancing whistleblower protections for contractor employees. DATES: Effective: September 30, 2013... contractor employees at FAR subpart 3.9. The pilot program is mandated by section 828, entitled ``Pilot...

  2. Site contractor participation in the DOE SWEIS process at Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass, A.; Garvey, D.

    1997-12-01

    The U.S. Department of Energy (DOE) prepares site-wide environmental impact statements (SWEIS) on sites that are to remain in operation in order to provide an estimate of the cumulative environmental impacts from projected future operations at the site. DOE has relied on outside contractors rather than the site management and operating (M&O) contractors to prepare EISs, in order to preclude the potential for conflict of interest. The site M&O contractors, who know the potential for conflict of interest. The site M&O contractors, who know the site best and are most familiar with existing information, are critical support for the contractor. The University of California (UC) is the site M&O contractor for Los Alamos National Laboratory (LANL) in Los Alamos, NM. The role of LANL (UC) personnel in DOE`s preparation process for the LANL SWEIS is described. 3 refs.

  3. Beyond the design fix - New industrialisation in contractor's supplier relationships

    DEFF Research Database (Denmark)

    Koch, Christian; Frödell, M.; Josephson, P.E.

    2010-01-01

    by the Erabuild program, this paper presents 3 cases of long term transformation of contractor- supplier relations as general contractors outsource and commence professionalising purchasing moving it from project purchasing into strategic purchasing. It is suggested that “new industrialisation” is a long term...

  4. 48 CFR 509.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Testing performed by the... ADMINISTRATION COMPETITION AND ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS First Article Testing and Approval 509.308-1 Testing performed by the contractor. In FSS solicitations and contracts that will require...

  5. Contractor-style tunnel cost estimating

    International Nuclear Information System (INIS)

    Scapuzzi, D.

    1990-06-01

    Keeping pace with recent advances in construction technology is a challenge for the cost estimating engineer. Using an estimating style that simulates the actual construction process and is similar in style to the contractor's estimate will give a realistic view of underground construction costs. For a contractor-style estimate, a mining method is chosen; labor crews, plant and equipment are selected, and advance rates are calculated for the various phases of work which are used to determine the length of time necessary to complete each phase of work. The durations are multiplied by the cost or labor and equipment per unit of time and, along with the costs for materials and supplies, combine to complete the estimate. Variations in advance rates, ground support, labor crew size, or other areas are more easily analyzed for their overall effect on the cost and schedule of a project. 14 figs

  6. Speech by Prime Minister Francois Fillon. Visit of the Jules Horowitz experimental reactor works on the Commissariat a l'Energie et aux Energies Alternatives site. Cadarache, May 3, 2010; Discours du Premier ministre Francois FILLON Cadarache, lundi 3 mai 2010. Visite du chantier du Reacteur experimental Jules Horowitz sur le site du Commissariat a l'Energie Atomique et aux Energies Alternatives

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    In this speech, the French Prime Minister evokes the present context, the importance of strategic technologies, and the challenge of investing in these technologies within a context of reduction of public expenses. He comments the decision of his government to finance research and education activities in different domains, and more specifically in the energy sector with this fourth generation Jules Horowitz experimental reactor. He recalls that the nuclear sector has always been very important to the eyes of the successive French governments, and outlines how this reactor will contribute to reactor operational optimization, lifetime extension and safety, nuclear fuel development, etc.

  7. Structural priming, action planning, and grammar.

    Science.gov (United States)

    MacDonald, Maryellen C; Weiss, Daniel J

    2017-01-01

    Structural priming is poorly understood and cannot inform accounts of grammar for two reasons. First, those who view performance as grammar + processing will always be able to attribute psycholinguistic data to processing rather than grammar. Second, structural priming may be simply an example of hysteresis effects in general action planning. If so, then priming offers no special insight into grammar.

  8. 78 FR 4425 - Notice of Proposed Information Collection: Comment Request; Multifamily Contractor's Mortgagor's...

    Science.gov (United States)

    2013-01-22

    ... Information Collection: Comment Request; Multifamily Contractor's Mortgagor's Cost Breakdowns and... comments on the subject proposal. Contractors use the form HUD-2328 to establish a schedule of values of construction items on which the monthly advances or mortgage proceeds are based. Contractors use the form HUD...

  9. 76 FR 68017 - Federal Acquisition Regulation; Preventing Personal Conflicts of Interest for Contractor...

    Science.gov (United States)

    2011-11-02

    ... Contractor Employees Performing Acquisition Functions AGENCIES: Department of Defense (DoD), General Services... personal conflicts of interest by employees of Government contractors as required by statute. DATES... clause for future orders. In the event that a contractor refuses to accept such a modification, the...

  10. 75 FR 55671 - Financial Assistance Use of Universal Identifier and Central Contractor Registration

    Science.gov (United States)

    2010-09-14

    ... of Universal Identifier and Central Contractor Registration AGENCY: Office of Federal Financial...) numbers and maintain current registrations in the Central Contractor Registration (CCR) database. An... CONTRACTOR REGISTRATION Sec. Subpart A--General 25.100 Purposes of this part. 25.105 Types of awards to which...

  11. The priming of basic combinatory responses in MEG.

    Science.gov (United States)

    Blanco-Elorrieta, Esti; Ferreira, Victor S; Del Prato, Paul; Pylkkänen, Liina

    2018-01-01

    Priming has been a powerful tool for the study of human memory and especially the memory representations relevant for language. However, although it is well established that lexical access can be primed, we do not know exactly what types of computations can be primed above the word level. This work took a neurobiological approach and assessed the ways in which the complex representation of a minimal combinatory phrase, such as red boat, can be primed, as evidenced by the spatiotemporal profiles of magnetoencephalography (MEG) signals. Specifically, we built upon recent progress on the neural signatures of phrasal composition and tested whether the brain activities implicated for the basic combination of two words could be primed. In two experiments, MEG was recorded during a picture naming task where the prime trials were designed to replicate previously reported combinatory effects and the target trials to test whether those combinatory effects could be primed. The manipulation of the primes was successful in eliciting larger activity for adjective-noun combinations than single nouns in left anterior temporal and ventromedial prefrontal cortices, replicating prior MEG studies on parallel contrasts. Priming of similarly timed activity was observed during target trials in anterior temporal cortex, but only when the prime and target shared an adjective. No priming in temporal cortex was observed for single word repetition and two control tasks showed that the priming effect was not elicited if the prime pictures were simply viewed but not named. In sum, this work provides evidence that very basic combinatory operations can be primed, with the necessity for some lexical overlap between prime and target suggesting combinatory conceptual, as opposed to syntactic processing. Both our combinatory and priming effects were early, onsetting between 100 and 150ms after picture onset and thus are likely to reflect the very earliest planning stages of a combinatory message

  12. Social priming increases nonverbal expressive behaviors in schizophrenia.

    Directory of Open Access Journals (Sweden)

    Jonathan Del-Monte

    Full Text Available Semantic priming tasks are classically used to influence and implicitly promote target behaviors. Recently, several studies have demonstrated that prosocial semantic priming modulated feelings of social affiliation. The main aim of this study was to determine whether inducing feelings of social affiliation using priming tasks could modulate nonverbal social behaviors in schizophrenia. We used the Scrambled Sentence Task to prime schizophrenia patients according to three priming group conditions: pro-social, non-social or anti-social. Forty-five schizophrenia patients, diagnosed according to DSM-IV-TR, were randomly assigned to one of the three priming groups of 15 participants. We evaluated nonverbal social behaviors using the Motor-Affective subscale of the Motor-Affective-Social-Scale. Results showed that schizophrenia patients with pro-social priming had significantly more nonverbal behaviors than schizophrenia patients with anti-social and non-social priming conditions. Schizophrenia patient behaviors are affected by social priming. Our results have several clinical implications for the rehabilitation of social skills impairments frequently encountered among individuals with schizophrenia.

  13. Contractors In The Theater: Implications For Joint Operational Planning And Execution

    National Research Council Canada - National Science Library

    Binder, Jeanne

    2003-01-01

    The use of contractors in the theater of operations is nothing new. However downsizing efforts and outsourcing as well as the increasing complexity of military equipment has increased military reliance on contractors...

  14. Optical coding theory with Prime

    CERN Document Server

    Kwong, Wing C

    2013-01-01

    Although several books cover the coding theory of wireless communications and the hardware technologies and coding techniques of optical CDMA, no book has been specifically dedicated to optical coding theory-until now. Written by renowned authorities in the field, Optical Coding Theory with Prime gathers together in one volume the fundamentals and developments of optical coding theory, with a focus on families of prime codes, supplemented with several families of non-prime codes. The book also explores potential applications to coding-based optical systems and networks. Learn How to Construct

  15. Contractor Development Models for Promoting Sustainable Building – a case for developing management capabilities of contractors

    CSIR Research Space (South Africa)

    Dlungwana, Wilkin S

    2004-11-01

    Full Text Available Construction industry and indeed all small and medium-sized contractors play a significant socio-economic role in the developing countries. This paper highlights the importance of promoting sustainable building through the implementation...

  16. 48 CFR 2052.209-72 - Contractor organizational conflicts of interest.

    Science.gov (United States)

    2010-10-01

    ... conflicts of interest. 2052.209-72 Section 2052.209-72 Federal Acquisition Regulations System NUCLEAR... Clauses 2052.209-72 Contractor organizational conflicts of interest. As prescribed at 2009.570-5(a) and..., contracts, and simplified acquisitions of the types described; 2009.570-4(b): Contractor Organizational...

  17. 48 CFR 252.247-7016 - Contractor liability for loss or damage.

    Science.gov (United States)

    2010-10-01

    ... the Contractor's negligence, indemnification shall be at a rate not to exceed sixty cents per pound per article. (ii) Negligent damage. When loss or damage is caused by the negligence of the Contractor...

  18. Priming of antiherbivore defensive responses in plants

    Institute of Scientific and Technical Information of China (English)

    Jinwon Kim; Gary W.Felton

    2013-01-01

    Defense priming is defined as increased readiness of defense induction.A growing body of literature indicates that plants (or intact parts of a plant) are primed in anticipation of impending environmental stresses,both biotic and abiotic,and upon the following stimulus,induce defenses more quickly and strongly.For instance,some plants previously exposed to herbivore-inducible plant volatiles (HIPVs) from neighboring plants under herbivore attack show faster or stronger defense activation and enhanced insect resistance when challenged with secondary insect feeding.Research on priming of antiherbivore defense has been limited to the HIPV-mediated mechanism until recently,but significant advances were made in the past three years,including non-HIPV-mediated defense priming,epigenetic modifications as the molecular mechanism of priming,and others.It is timely to consider the advances in research on defense priming in the plantinsect interactions.

  19. Salt repository project: Technical progress report for the quarter 1 April--30 June 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This document reports the progress being made each quarter on the development of a geologic repository in salt for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Nuclear Waste Isolation, a prime contractor of the US Department of Energy (DOE) Salt Repository Project Office. The studies include work by other DOE prime contractors and by contractors to the Office of Nuclear Waste Isolation

  20. Salt Repository Project technical progress report for the quarter 1 January--31 March 1987

    International Nuclear Information System (INIS)

    1988-03-01

    This document reports the progress being made each quarter on the development of a geologic repository in salt for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Nuclear Waste Isolation, a prime contractor of the US Department of energy (DOE) Salt Repository Project Office. The studies include work by other DOE prime contractors and by contractors to the Office of Nuclear Waste Isolation. 23 refs., 1 fig

  1. Military Contractors - Too Much Dependence

    Science.gov (United States)

    2008-03-19

    promotes integrity, physical strength, health, unity, cooperation and teamwork. It combats stereotyping and sexual harassment. It fosters in its...weeklyreport108-000001337290&type= toc &num=115&; accessed 15 Jan 2008. 20 U.S. Department of the Army, Contractors on the Battlefield, Field Manual 3

  2. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  3. Collaboration in long-term stewardship at DOE Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Moren, R. J.; Zeisloft, J. H.; Feist, E. T.; Brown, D.; Grindstaff, K. D.

    2013-01-10

    parcel that includes one of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. This paper highlights the accomplishments and collaborative efforts to address the challenges faced as work progresses from the cleanup to transitioning of land parcels to LTS Program.

  4. Collaboration in long-term stewardship at DOE Hanford Site-13019

    International Nuclear Information System (INIS)

    Moren, R. J.; Zeisloft, J. H.; Feist, E. T.; Brown, D.; Grindstaff, K. D.

    2013-01-01

    of the six (6) cocooned reactors on site. These accomplishments relied upon the transparency between DOE cleanup programs and their contractors working together to successfully transition the land while addressing the challenges that arise. All parties, the three different DOE Programs and their respective prime contractors are dedicated to working together and continuing the progress of transitioning land to LTS, in alignment with the Program Plan and compliant with contractual requirements. This paper highlights the accomplishments and collaborative efforts to address the challenges faced as work progresses from the cleanup to transitioning of land parcels to LTS Program

  5. Random reward priming is task-contingent: The robustness of the 1-trial reward priming effect

    Directory of Open Access Journals (Sweden)

    Árni Gunnar Ásgeirsson

    2014-04-01

    Full Text Available Consistent financial reward of particular features influences the allocation of visual attention in many ways. More surprising are 1-trial reward priming effects on attention where reward schedules are random and reward on one trial influences attentional allocation on the next. Those findings are thought to reflect that rewarded features become more salient than unrewarded ones on the subsequent trial. Here we attempt to conceptually replicate this effect, testing its generalizability. In three versions of an analogous paradigm to the additional singleton paradigm involving singleton search for a Gabor patch of odd spatial frequency we found no evidence of reward priming, while we only partially replicate the reward priming in the exact original paradigm tested by Hickey and colleagues. The results cast doubt on the proposal that random reward enhances salience, suggested in the original papers, and highlight the need for a more nuanced account. In many other paradigms reward effects have been found to progress gradually, becoming stronger as they build up, and we argue that for robust reward priming, reward schedules need to be more consistent than in the original 1-trial reward priming paradigm.

  6. Development of PRIME for irradiation performance analysis of U-Mo/Al dispersion fuel

    Science.gov (United States)

    Jeong, Gwan Yoon; Kim, Yeon Soo; Jeong, Yong Jin; Park, Jong Man; Sohn, Dong-Seong

    2018-04-01

    A prediction code for the thermo-mechanical performance of research reactor fuel (PRIME) has been developed with the implementation of developed models to analyze the irradiation behavior of U-Mo dispersion fuel. The code is capable of predicting the two-dimensional thermal and mechanical performance of U-Mo dispersion fuel during irradiation. A finite element method was employed to solve the governing equations for thermal and mechanical equilibria. Temperature- and burnup-dependent material properties of the fuel meat constituents and cladding were used. The numerical solution schemes in PRIME were verified by benchmarking solutions obtained using a commercial finite element analysis program (ABAQUS). The code was validated using irradiation data from RERTR, HAMP-1, and E-FUTURE tests. The measured irradiation data used in the validation were IL thickness, volume fractions of fuel meat constituents for the thermal analysis, and profiles of the plate thickness changes and fuel meat swelling for the mechanical analysis. The prediction results were in good agreement with the measurement data for both thermal and mechanical analyses, confirming the validity of the code.

  7. Critical Electronic Data Loss Perceptions of United States Military Contractors

    Science.gov (United States)

    Singletary, Tod J.

    2017-01-01

    The United States Military has become increasingly dependent upon technology to meet its mission objectives with a consequence being greater dependence on civilian defense contractors to provide specialized services in support of high-tech mission requirements. Modern military defense contractors have also become dependent upon reliable and secure…

  8. 48 CFR 52.209-3 - First Article Approval-Contractor Testing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false First Article Approval... Clauses 52.209-3 First Article Approval—Contractor Testing. As prescribed in 9.308-1 (a) and (b), insert the following clause: First Article Approval—Contractor Testing (SEP 1989) [Contracting Officer shall...

  9. Appeals - Redetermination by a Medicare Contractor

    Data.gov (United States)

    U.S. Department of Health & Human Services — A redetermination is an examination of a claim by the fiscal intermediary (FI), carrier, or Medicare Administrative Contractor (MAC) personnel who are different from...

  10. Human Resources Staffing Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    BOSLEY, J.W.

    2000-01-01

    The Human Resources Staffing Plan quantified the equivalent staffing needs required for the Tank Farm Contractor (TFC) and its subcontractors to execute the readiness to proceed baseline between FY 2000-2008. The TFC staffing needs were assessed along with the staffings needs of Fluor Hanford and the privatization contractor. The plan then addressed the staffing needs and recruitment strategies required to execute the baseline

  11. Receiving Basin for Offsite Fuels and the Resin Regeneration Facility Safety Analysis Report, Executive Summary

    International Nuclear Information System (INIS)

    Shedrow, C.B.

    1999-01-01

    The Safety Analysis Report documents the safety authorization basis for the Receiving Basin for Offsite Fuels (RBOF) and the Resin Regeneration Facility (RRF) at the Savannah River Site (SRS). The present mission of the RBOF and RRF is to continue in providing a facility for the safe receipt, storage, handling, and shipping of spent nuclear fuel assemblies from power and research reactors in the United States, fuel from SRS and other Department of Energy (DOE) reactors, and foreign research reactors fuel, in support of the nonproliferation policy. The RBOF and RRF provide the capability to handle, separate, and transfer wastes generated from nuclear fuel element storage. The DOE and Westinghouse Savannah River Company, the prime operating contractor, are committed to managing these activities in such a manner that the health and safety of the offsite general public, the site worker, the facility worker, and the environment are protected

  12. Receiving Basin for Offsite Fuels and the Resin Regeneration Facility Safety Analysis Report, Executive Summary

    Energy Technology Data Exchange (ETDEWEB)

    Shedrow, C.B.

    1999-11-29

    The Safety Analysis Report documents the safety authorization basis for the Receiving Basin for Offsite Fuels (RBOF) and the Resin Regeneration Facility (RRF) at the Savannah River Site (SRS). The present mission of the RBOF and RRF is to continue in providing a facility for the safe receipt, storage, handling, and shipping of spent nuclear fuel assemblies from power and research reactors in the United States, fuel from SRS and other Department of Energy (DOE) reactors, and foreign research reactors fuel, in support of the nonproliferation policy. The RBOF and RRF provide the capability to handle, separate, and transfer wastes generated from nuclear fuel element storage. The DOE and Westinghouse Savannah River Company, the prime operating contractor, are committed to managing these activities in such a manner that the health and safety of the offsite general public, the site worker, the facility worker, and the environment are protected.

  13. Application of integrated fuzzy VIKOR & AHP methodology to contractor ranking

    Directory of Open Access Journals (Sweden)

    Mohamad Rahim Ramezaniyan

    2012-08-01

    Full Text Available Contractor selection is a critical activity, which plays an important role in the overall success of any construction project. The implementation of fuzzy multiple criteria decision attribute (MCDA in selecting contractors has the advantage of rendering subjective and implicit decision making more objective and transparent. An additional merit of fuzzy MCDA is the ability to accommodate quantitative and qualitative information. In this paper, an integrated VIKOR–AHP methodology is proposed to make a selection among the alternative contractors in one of Iranian construction industry projects. In the proposed methodology, the weights of the selection criteria are determined by fuzzy pairwise comparison matrices of AHP.

  14. Mechanisms of masked evaluative priming: task sets modulate behavioral and electrophysiological priming for picture and words differentially

    OpenAIRE

    Kiefer, Markus; Liegel, Nathalie; Zovko, Monika; Wentura, Dirk

    2016-01-01

    Research with the evaluative priming paradigm has shown that affective evaluation processes reliably influence cognition and behavior, even when triggered outside awareness. However, the precise mechanisms underlying such subliminal evaluative priming effects, response activation vs semantic processing, are matter of a debate. In this study, we determined the relative contribution of semantic processing and response activation to masked evaluative priming with pictures and words. To this end,...

  15. 48 CFR 836.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. The contracting officer shall insert the clause at 852.236-72, Performance of work by the contractor, in solicitations and contracts for construction that contain the FAR...

  16. 48 CFR 9.308-1 - Testing performed by the contractor.

    Science.gov (United States)

    2010-10-01

    ... the contractor. (a)(1) The contracting officer shall insert the clause at 52.209-3, First Article... it is intended that the contract require (i) first article approval and (ii) that the contractor be... produce the first article and the production quantity at the same facility, the contracting officer shall...

  17. Priming analogical reasoning with false memories.

    Science.gov (United States)

    Howe, Mark L; Garner, Sarah R; Threadgold, Emma; Ball, Linden J

    2015-08-01

    Like true memories, false memories are capable of priming answers to insight-based problems. Recent research has attempted to extend this paradigm to more advanced problem-solving tasks, including those involving verbal analogical reasoning. However, these experiments are constrained inasmuch as problem solutions could be generated via spreading activation mechanisms (much like false memories themselves) rather than using complex reasoning processes. In three experiments we examined false memory priming of complex analogical reasoning tasks in the absence of simple semantic associations. In Experiment 1, we demonstrated the robustness of false memory priming in analogical reasoning when backward associative strength among the problem terms was eliminated. In Experiments 2a and 2b, we extended these findings by demonstrating priming on newly created homonym analogies that can only be solved by inhibiting semantic associations within the analogy. Overall, the findings of the present experiments provide evidence that the efficacy of false memory priming extends to complex analogical reasoning problems.

  18. Priming intelligent behavior: an elusive phenomenon.

    Directory of Open Access Journals (Sweden)

    David R Shanks

    Full Text Available Can behavior be unconsciously primed via the activation of attitudes, stereotypes, or other concepts? A number of studies have suggested that such priming effects can occur, and a prominent illustration is the claim that individuals' accuracy in answering general knowledge questions can be influenced by activating intelligence-related concepts such as professor or soccer hooligan. In 9 experiments with 475 participants we employed the procedures used in these studies, as well as a number of variants of those procedures, in an attempt to obtain this intelligence priming effect. None of the experiments obtained the effect, although financial incentives did boost performance. A Bayesian analysis reveals considerable evidential support for the null hypothesis. The results conform to the pattern typically obtained in word priming experiments in which priming is very narrow in its generalization and unconscious (subliminal influences, if they occur at all, are extremely short-lived. We encourage others to explore the circumstances in which this phenomenon might be obtained.

  19. Priming Intelligent Behavior: An Elusive Phenomenon

    Science.gov (United States)

    Shanks, David R.; Newell, Ben R.; Lee, Eun Hee; Balakrishnan, Divya; Ekelund, Lisa; Cenac, Zarus; Kavvadia, Fragkiski; Moore, Christopher

    2013-01-01

    Can behavior be unconsciously primed via the activation of attitudes, stereotypes, or other concepts? A number of studies have suggested that such priming effects can occur, and a prominent illustration is the claim that individuals' accuracy in answering general knowledge questions can be influenced by activating intelligence-related concepts such as professor or soccer hooligan. In 9 experiments with 475 participants we employed the procedures used in these studies, as well as a number of variants of those procedures, in an attempt to obtain this intelligence priming effect. None of the experiments obtained the effect, although financial incentives did boost performance. A Bayesian analysis reveals considerable evidential support for the null hypothesis. The results conform to the pattern typically obtained in word priming experiments in which priming is very narrow in its generalization and unconscious (subliminal) influences, if they occur at all, are extremely short-lived. We encourage others to explore the circumstances in which this phenomenon might be obtained. PMID:23637732

  20. Reference modular High Temperature Gas-Cooled Reactor Plant: Concept description report

    International Nuclear Information System (INIS)

    1986-10-01

    This report provides a summary description of the Modular High Temperature Gas-Cooled Reactor (MHTGR) concept and interim results of assessments of costs, safety, constructibility, operability, maintainability, and availability. Conceptual design of this concept was initiated in October 1985 and is scheduled for completion in 1987. Participating industrial contractors are Bechtel National, Inc. (BNI), Stone and Webster Engineering Corporation (SWEC), GA Technologies, Inc. (GA), General Electric Co. (GE), and Combustion Engineering, Inc

  1. Reference modular High Temperature Gas-Cooled Reactor Plant: Concept description report

    Energy Technology Data Exchange (ETDEWEB)

    1986-10-01

    This report provides a summary description of the Modular High Temperature Gas-Cooled Reactor (MHTGR) concept and interim results of assessments of costs, safety, constructibility, operability, maintainability, and availability. Conceptual design of this concept was initiated in October 1985 and is scheduled for completion in 1987. Participating industrial contractors are Bechtel National, Inc. (BNI), Stone and Webster Engineering Corporation (SWEC), GA Technologies, Inc. (GA), General Electric Co. (GE), and Combustion Engineering, Inc. (C-E).

  2. 76 FR 37353 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Business Ethics Compliance...

    Science.gov (United States)

    2011-06-27

    ...; Submission for OMB Review; Contractor Business Ethics Compliance Program and Disclosure Requirements AGENCIES... contractor business ethics compliance program and disclosure requirements. Public comments are particularly... Information Collection 9000- 0164, Contractor Business Ethics Compliance Program and Disclosure Requirements...

  3. 105-C Reactor interim safe storage project technology integration plan

    International Nuclear Information System (INIS)

    Pulsford, S.K.

    1997-01-01

    The 105-C Reactor Interim Safe Storage Project Technology Integration Plan involves the decontamination, dismantlement, and interim safe storage of a surplus production reactor. A major goal is to identify and demonstrate new and innovative D and D technologies that will reduce costs, shorten schedules, enhance safety, and have the potential for general use across the RL complex. Innovative technologies are to be demonstrated in the following areas: Characterization; Decontamination; Waste Disposition; Dismantlement, Segmentation, and Demolition; Facility Stabilization; and Health and Safety. The evaluation and ranking of innovative technologies has been completed. Demonstrations will be selected from the ranked technologies according to priority. The contractor team members will review and evaluate the demonstration performances and make final recommendations to DOE

  4. 48 CFR 36.501 - Performance of work by the contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Performance of work by the... Performance of work by the contractor. (a) To assure adequate interest in and supervision of all work involved... contracting officer shall insert the clause at 52.236-1, Performance of Work by the Contractor, in...

  5. MPQS with three large primes

    NARCIS (Netherlands)

    Leyland, P.; Lenstra, A.K.; Dodson, B.; Muffett, A.; Wagstaff, S.; Fieker, C.; Kohel, D.R.

    2002-01-01

    We report the factorization of a 135-digit integer by the triple-large-prime variation of the multiple polynomial quadratic sieve. Previous workers [6][10] had suggested that using more than two large primes would be counterproductive, because of the greatly increased number of false reports from

  6. 76 FR 73564 - Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration

    Science.gov (United States)

    2011-11-29

    ... Federal Acquisition Regulation; Updates to Contract Reporting and Central Contractor Registration AGENCIES... Procurement Data System (FPDS). Additionally, changes are proposed for the clauses requiring contractor registration in the Central Contractor Registration (CCR) database and DUNS number reporting. DATES: Interested...

  7. Farm Building Contractors and Manufacturers: Their Role in Midwest Farm Construction

    Science.gov (United States)

    Lyle Solverson; David C. Baumgartner

    1974-01-01

    Describes and analyzes the activities of farm building contractors and manufacturers in Illinois, Indiana, Iowa, and Missouri. Contractors and manufacturers are setting the trend in the farm building market in terms of building type and size and materials used.

  8. Shifting evaluation windows : predictable forward primes with long SOAs eliminate the impact of backward primes.

    NARCIS (Netherlands)

    Fockenberg, D. A. F.; Koole, S.L.; Lakens, D.; Semin, G.R.

    2013-01-01

    Recent work suggests that people evaluate target stimuli within short and flexible time periods called evaluation windows. Stimuli that briefly precede a target (forward primes) or briefly succeed a target (backward primes) are often included in the target's evaluation. In this article, the authors

  9. 77 FR 14490 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor...

    Science.gov (United States)

    2012-03-12

    ... Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel (DFARS Case... (DFARS) to expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Comment Date: Comments on the proposed rule should be...

  10. Hanford's Public Tour Program - An Excellent Educational Tool

    International Nuclear Information System (INIS)

    Sinclair, K.M.

    2010-01-01

    Prior to 2001, the Department of Energy (DOE) sponsored limited tours of the Hanford Site for the public, but discontinued the program after the 9/11 terrorist attacks on the U.S. In 2003, DOE's Richland Operations Office (DOE-RL) requested the site's prime contractor to reinstate the public tour program starting in 2004 under strict controls and security requirements. The planning involved a collaborative effort among the security, safety and communications departments of DOE-RL and the site's contracting companies. This paper describes the evolution of, and enhancements to, Hanford's public tours, including the addition of a separate tour program for the B Reactor, the first full-scale nuclear reactor in the world. Topics included in the discussion include the history and growth of the tour program, associated costs, and visitor surveys and assessments.

  11. Wheat seed enhancement by vitamin and hormonal priming

    International Nuclear Information System (INIS)

    Khan, M.B.; Gurchani, M.A.; Hussain, M.

    2011-01-01

    Seed priming has proven beneficial in many important agricultural crops. The present study was conducted to explore the role (if any) of hormonal and vitamin seed priming to improve the germination, seedling emergence, early seedling establishment, electrolyte leakage and nutrients uptake in wheat seedlings. The wheat seeds were soaked for 48 hours in aerated solution of salicylic acid, ascorbic acid, kinetin and GA3 with 20 ppm concentration of each solution, whereas untreated seeds were taken as control. Seed priming with ascorbic acid resulted in maximum final germination and emergence percentage (FGP and FEP), radical and plumule length, root and shoot length, number of secondary roots, root shoot ratio, root dry weight, shoot dry weight and seedling dry weight compared to control (untreated seeds). Minimum mean germination and emergence time (MGT and MET) was recorded in seeds primed with kinetin and GA3. While in case of biochemical attributes, seedling potassium contents were decreased by hormonal seed priming while total soluble sugars were increased by salicylic acid and ascorbic acid seed priming. Hormonal seed priming had non-significant effect on phosphorus seedling contents. Untreated (Control) seeds showed maximum electrical conductivity at 0.5, 1, 2, 6, 12 and 24 h after inbibition than primed seeds against the minimum electrical conductivity that was recorded in seeds primed with salicylic acid and ascorbic acid. In conclusion, the wheat seeds primed with 20 ppm solution of ascorbic acid may be used for wheat seed invigoration. (author)

  12. Operator/contractor relationships

    International Nuclear Information System (INIS)

    Smith, J.R.; Kidwell, C.K.; Unger, V.E.; Fercho, E.; Helmer, C.M.

    1992-01-01

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  13. 77 FR 59339 - Contractor Qualifications

    Science.gov (United States)

    2012-09-27

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 209 Contractor Qualifications CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 2 (Parts 201-299), revised as of October 1, 2011, on page 55, in section 209.104-70, paragraph (a) is amended by revising the...

  14. Contingency Contractor Optimization Phase 3 Sustainment Platform Requirements - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Frazier, Christopher Rawls [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bandlow, Alisa [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gearhart, Jared Lee [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Jones, Katherine A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-01

    Sandia National Laboratories (Sandia) is in Phase 3 Sustainment of development of a prototype tool, currently referred to as the Contingency Contractor Optimization Tool - Prototype (CCOTP), under the direction of OSD Program Support. CCOT-P is intended to help provide senior Department of Defense (DoD) leaders with comprehensive insight into the global availability, readiness and capabilities of the Total Force Mix. The CCOT-P will allow senior decision makers to quickly and accurately assess the impacts, risks and mitigating strategies for proposed changes to force/capabilities assignments, apportionments and allocations options, focusing specifically on contingency contractor planning. During Phase 2 of the program, conducted during fiscal year 2012, Sandia developed an electronic storyboard prototype of the Contingency Contractor Optimization Tool that can be used for communication with senior decision makers and other Operational Contract Support (OCS) stakeholders. Phase 3 used feedback from demonstrations of the electronic storyboard prototype to develop an engineering prototype for planners to evaluate. Sandia worked with the DoD and Joint Chiefs of Staff strategic planning community to get feedback and input to ensure that the engineering prototype was developed to closely align with future planning needs. The intended deployment environment was also a key consideration as this prototype was developed. Initial release of the engineering prototype was done on servers at Sandia in the middle of Phase 3. In 2013, the tool was installed on a production pilot server managed by the OUSD(AT&L) eBusiness Center. The purpose of this document is to specify the CCOT-P engineering prototype platform requirements as of May 2016. Sandia developed the CCOT-P engineering prototype using common technologies to minimize the likelihood of deployment issues. CCOT-P engineering prototype was architected and designed to be as independent as possible of the major deployment

  15. Defense Primer: DOD Contractors

    Science.gov (United States)

    2017-02-10

    functions, from intelligence analysis or software development to landscaping or food service. Why does DOD use individual contractors? Going back to...that provide professional services, from research to management support. The bulk of contractors—more than 70%—provide products, and these include...10 U.S.C. Part IV: Service, Supply, and Procurement. CRS Products CRS In Focus IF10548, Defense Primer: U.S. Defense Industrial Base, by Daniel

  16. Lexical priming in Alzheimer's disease and aphasia.

    Science.gov (United States)

    Arroyo-Anlló, Eva Maria; Beauchamps, Mireille; Ingrand, Pierre; Neau, Jean Philippe; Gil, Roger

    2013-01-01

    Lexical priming was examined in patients with Alzheimer's disease and in aphasic patients. Control participants were divided into young and elderly [cf. Arroyo-Anlló et al.: Eur J Cogn Psychol 2004;16:535-553]. For lexical priming, a word-stem completion task was used. Normal elderly participants had lexical priming scores that were significantly lower than those of young individuals. Analysis of covariance with age and educational level as covariates showed that the control participants, aphasic and Alzheimer patients did not differ significantly on the lexical priming task. Our results suggest that performance in the lexical priming task diminishes with physiological aging, but is not significantly affected by mild or moderate Alzheimer's disease or by fluent or non-fluent aphasia. Copyright © 2013 S. Karger AG, Basel.

  17. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    Science.gov (United States)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  18. 48 CFR 1845.7101-5 - Contractor's privileged financial and business information.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor's privileged financial and business information. 1845.7101-5 Section 1845.7101-5 Federal Acquisition Regulations System... 1845.7101-5 Contractor's privileged financial and business information. If a transfer of property...

  19. 77 FR 10461 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2012-02-22

    ... Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise Tax AGENCIES.... Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in order to... payment. Additionally, the law stipulates that no funds are to be disbursed to any foreign contractor in...

  20. Metropolitan Optical Networks 1995 Annual Report

    DEFF Research Database (Denmark)

    Kristensen, Martin; Jouanno, Jean-Marc; Malone, Kevin

    1996-01-01

    The annual report describes the research carried out in the ACTS-project METON (Metropolitan Optical Networks) in 1995. L.M. Ericsson is prime contractor and 12 partners including DTU is involved in the project.......The annual report describes the research carried out in the ACTS-project METON (Metropolitan Optical Networks) in 1995. L.M. Ericsson is prime contractor and 12 partners including DTU is involved in the project....

  1. The prime numbers and their distribution

    CERN Document Server

    Tenenbaum, Gerald

    2000-01-01

    One notable new direction this century in the study of primes has been the influx of ideas from probability. The goal of this book is to provide insights into the prime numbers and to describe how a sequence so tautly determined can incorporate such a striking amount of randomness. The book opens with some classic topics of number theory. It ends with a discussion of some of the outstanding conjectures in number theory. In between are an excellent chapter on the stochastic properties of primes and a walk through an elementary proof of the Prime Number Theorem. This book is suitable for anyone who has had a little number theory and some advanced calculus involving estimates. Its engaging style and invigorating point of view will make refreshing reading for advanced undergraduates through research mathematicians.

  2. Semantic transparency affects morphological priming . . . eventually.

    Science.gov (United States)

    Heyer, Vera; Kornishova, Dana

    2018-05-01

    Semantic transparency has been in the focus of psycholinguistic research for decades, with the controversy about the time course of the application of morpho-semantic information during the processing of morphologically complex words not yet resolved. This study reports two masked priming studies with English - ness and Russian - ost' nominalisations, investigating how semantic transparency modulates native speakers' morphological priming effects at short and long stimulus onset asynchronies (SOAs). In both languages, we found increased morphological priming for nominalisations at the transparent end of the scale (e.g. paleness - pale) in comparison to items at the opaque end of the scale (e.g. business - busy) but only at longer prime durations. The present findings are in line with models that posit an initial phase of morpho-orthographic (semantically blind) decomposition.

  3. Continued Funding for Prime Development

    Science.gov (United States)

    2012-04-18

    PHP language with the help of CMF Drupal-6. The standard modules of the Drupal core set are developed by third parties and obtained from the...repository drupal.org. Part of the modules was modified specifically for the PrIMe portal. The PrIMe portal uses MySQL for the database technology. It is

  4. 76 FR 52378 - Privacy Act; System of Records: State-76, Personal Services Contractor Records

    Science.gov (United States)

    2011-08-22

    ... Services Contractor Records SUMMARY: Notice is hereby given that the Department of State proposes to create a new system of records, Personal Services Contractor Records, State-76, pursuant to the provisions... July 20, 2011. It is proposed that the new system be named ``Personal Services Contractor Records.'' It...

  5. 48 CFR 225.7303-1 - Contractor sales to other foreign customers.

    Science.gov (United States)

    2010-10-01

    ... foreign customers. 225.7303-1 Section 225.7303-1 Federal Acquisition Regulations System DEFENSE... for Foreign Military Sales 225.7303-1 Contractor sales to other foreign customers. If the contractor has made sales of the item required for the foreign military sale to foreign customers under...

  6. Development and validation of a strategic repositioning model for defense and aerospace contractors

    Science.gov (United States)

    Bers, John A.

    Strategic repositioning refers to the organized efforts of defense contractors to "reposition" a technology that they have developed for a defense sector customer into a civilian or commercial market. The strategic repositioning model developed here is a structural model: it seeks to isolate the factors that influence choice of strategy, which in turn influences the organization's performance. The model draws from the prior experience of contractors (through interviews and surveys) and companies in other sectors (through a review of the relevant published research). (1) Over all, the model accounted for 55% of the variance in financial performance of the sample and 35% for the underlying population. (2) Key success factors include a rigorous planning process, a target market in the growth (vs. incubation) stage, a priority on market leadership as well as financial return, the ability to operate in an ambiguous business environment, and a relatively short time horizon but strong corporate support. (3) The greatest challenges that a contractor is likely to encounter are understanding his new customers' buying practices, strong competition, and adapting his technology to their needs and price expectations. (4) To address these issues contractors often involve partners in their entry strategy, but partnerships of equals tend to be more difficult to bring off than direct entry strategies. (5) The two major target market categories--government and commercial--present different challenges. Commercial customers are more likely to resist doing business with the contractor, while contractors entering government and other noncommercial markets are more likely to encounter price resistance, low technical sophistication among customers, and difficulties reaching their customer base. (6) Despite these differences across markets, performance is not influenced by the target market category, nor by the type of product or service or the contractor's functional orientation (marketing

  7. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  8. Private security and military contractors: A troubling oversight

    DEFF Research Database (Denmark)

    Swed, Ori; Crosbie, Thomas Alexander

    2017-01-01

    Though private military and security companies (PMSCs) have been addressed extensively in the literature, little research has been done on the contractors themselves, leaving us in the dark as to who these individuals are. In this article, we focus on the critical case of the United States armed...... and concomitant evolution of the security sector, while noting a new trend that points to the need for moving from the macrosocial to the microsocial level of inquiry. Second, we indicate the challenges contractors pose to the sociological paradigm of military professionalism: These suggest a need to move from...

  9. Contractor Past Performance - Are We There Yet?

    National Research Council Canada - National Science Library

    Guerrero, Juan

    2001-01-01

    During the United States federal government acquisition reform movement of the 1990s, the government strongly emphasized the use of past performance information to select contractors in federal procurements...

  10. Rapid modulation of spoken word recognition by visual primes.

    Science.gov (United States)

    Okano, Kana; Grainger, Jonathan; Holcomb, Phillip J

    2016-02-01

    In a masked cross-modal priming experiment with ERP recordings, spoken Japanese words were primed with words written in one of the two syllabary scripts of Japanese. An early priming effect, peaking at around 200ms after onset of the spoken word target, was seen in left lateral electrode sites for Katakana primes, and later effects were seen for both Hiragana and Katakana primes on the N400 ERP component. The early effect is thought to reflect the efficiency with which words in Katakana script make contact with sublexical phonological representations involved in spoken language comprehension, due to the particular way this script is used by Japanese readers. This demonstrates fast-acting influences of visual primes on the processing of auditory target words, and suggests that briefly presented visual primes can influence sublexical processing of auditory target words. The later N400 priming effects, on the other hand, most likely reflect cross-modal influences on activity at the level of whole-word phonology and semantics.

  11. Lease vs. Purchase in Defense Acquisition

    National Research Council Canada - National Science Library

    Hensley, Carlton L; Tinjum, Archie L

    2008-01-01

    With declining budgets and consolidation in the defense industry, should competition between prime and sub-prime contractors be fostered through innovative lease arrangements similar to the Navy's TAKX...

  12. Program summary for the Civilian Reactor Development Program

    International Nuclear Information System (INIS)

    1982-07-01

    This Civilian Reactor Development Program document has the prime purpose of summarizing the technical programs supported by the FY 1983 budget request. This section provides a statement of the overall program objectives and a general program overview. Section II presents the technical programs in a format intended to show logical technical interrelationships, and does not necessarily follow the structure of the formal budget presentation. Section III presents the technical organization and management structure of the program

  13. The market potential of the high-temperature reactor

    International Nuclear Information System (INIS)

    Knizia, K.

    1982-01-01

    It seems urgently necessary to plant the power supplies of the industrial countries in a more flexible fashion and thereby to make them more susceptible to disturbances arising externally through restrictions on fuel deliveries or price increases. The development and introduction of advanced reactors and the further development of coal processing are of prime importance in this respect. This development will lead in the long-term to the production of hydrogen with the use of nuclear energy. (orig.) [de

  14. Prime implicants in dynamic reliability analysis

    International Nuclear Information System (INIS)

    Tyrväinen, Tero

    2016-01-01

    This paper develops an improved definition of a prime implicant for the needs of dynamic reliability analysis. Reliability analyses often aim to identify minimal cut sets or prime implicants, which are minimal conditions that cause an undesired top event, such as a system's failure. Dynamic reliability analysis methods take the time-dependent behaviour of a system into account. This means that the state of a component can change in the analysed time frame and prime implicants can include the failure of a component at different time points. There can also be dynamic constraints on a component's behaviour. For example, a component can be non-repairable in the given time frame. If a non-repairable component needs to be failed at a certain time point to cause the top event, we consider that the condition that it is failed at the latest possible time point is minimal, and the condition in which it fails earlier non-minimal. The traditional definition of a prime implicant does not account for this type of time-related minimality. In this paper, a new definition is introduced and illustrated using a dynamic flowgraph methodology model. - Highlights: • A new definition of a prime implicant is developed for dynamic reliability analysis. • The new definition takes time-related minimality into account. • The new definition is needed in dynamic flowgraph methodology. • Results can be represented by a smaller number of prime implicants.

  15. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  16. Improving UK client-contractor relations

    International Nuclear Information System (INIS)

    Brant, A.W.

    1996-01-01

    The client's aim in any decommissioning project is that the originally intended end point is achieved, within budget and on time. The contractor's aim is to have a satisfied client, so that both are happy to work together again, and to have a reasonable return for his efforts. How can these - not incompatible - aims best be achieved? (UK)

  17. 75 FR 10267 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Motor...

    Science.gov (United States)

    2010-03-05

    ... ADMINISTRATION [OMB Control No. 9000-0032] Federal Acquisition Regulation; Submission for OMB Review; Contractor... previously approved information collection requirement concerning contractor use of interagency motor pool... contracting officer may authorize cost-reimbursement contractors to obtain, for official purposes only...

  18. 77 FR 63835 - Office of the Chief Information Officer; Submission for OMB Review; Temporary Contractor...

    Science.gov (United States)

    2012-10-17

    ... of the Chief Information Officer; Submission for OMB Review; Temporary Contractor Information... information collection requirement regarding temporary contractor information worksheet. A notice was... for temporary contractors as a result of the American Recovery and Reinvestment Act of 2009 (Public...

  19. institutional and resource constraints that inhibit contractor ...

    African Journals Online (AJOL)

    p2333147

    Keywords: Institutions; small-scale contractor performance; sugar industry. ABSTRACT ..... diverse cultural settings, women, specifically widowed or single women, have a .... constraints on business growth, such as the work limitations placed.

  20. Event generators for {{\\eta }}/{{{\\eta }}}^{^{\\prime} } decays at BESIII

    Science.gov (United States)

    Qin, Nian; Zhang, Zhen-Yu; Fang, Shuang-Shi; Zhou, Xiang; Du, Lin-Lin; Qiao, Hao-Xue

    2018-01-01

    The light unflavoured meson {{η }}/{{{η }}}^{\\prime } decays are valuable for testing non-perturbative quantum chromodynamics and exploring new physics beyond the Standard Model. This paper describes a series of event generators, including {{η }}/{{{η }}}^{\\prime }\\to {{γ }}{{{l}}}+{{{l}}}-, {{η }}/{{{η }}}^{\\prime }\\to {{γ }}{{{π }}}+{{{π }}}-, {{{η }}}^{\\prime }\\to {{ω }}{{{e}}}+{{{e}}}-, {{η }}\\to {{{π }}}+{{{π }}}-{{{π }}}0, {{η }}/{{{η }}}^{\\prime }\\to {{{π }}}0{{{π }}}0{{{π }}}0, {{{η }}}^{\\prime }\\to {{η }}{{π }}{{π }} and {{{η }}}^{\\prime }\\to {{{π }}}+{{{π }}}-{{{π }}}+{{{π }}}-/{{{π }}}+{{{π }}}-{{{π }}}0{{{π }}}0, which have been developed for investigating {{η }}/{{{η }}}^{\\prime } decay dynamics. For most of these generators, their usability has been validated in BESIII analyses for determining the detection efficiency, and background studies. The consistency between data and Monte Carlo shows that these generators work well in the BESIII simulation, and will also be useful for ongoing BESIII analyses and other experiments for studying {{η }}/{{{η }}}^{\\prime } physics. Supported by National Natural Science Foundation of China (NSFC) (11205117, 11575133, 11675184), the China Scholarship Council (201506275156), the Wuhan University PhD Short-time Mobility Program 2016, the Joint Funds of the NSFC and Henan Province (U1504112)

  1. CONTRACTORS OF SOCIALIZATION AND THEIR INFLUENCE ON SOCIAL PROCESSES

    OpenAIRE

    Mikhail Yu. POPOV

    2016-01-01

    This article is devoted to the analysis of an essence of the concept "contractors of socialization" and attempt of definition of its place in structure of sociological knowledge. During the solution of this task the author seeks to define destructive nature of influence of contractors of socialization on formation of the personality both at a stage of primary socialization, and in the course of the entire period of its activity. Inclusion of this term in structure of sociological knowledge, a...

  2. 78 FR 13547 - Defense Federal Acquisition Regulation Supplement: Alleged Crimes By or Against Contractor Personnel

    Science.gov (United States)

    2013-02-28

    ... Contractor Personnel AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION... (FY) 2009 and expand coverage on contractor requirements and responsibilities relating to alleged crimes by or against contractor personnel. DATES: Effective February 28, 2013. FOR FURTHER INFORMATION...

  3. Licensee contractor and vendor inspection status report

    International Nuclear Information System (INIS)

    1990-10-01

    A fundamental premise of the Nuclear Regulatory Commission's (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The total government-industry system for the inspection of commercial nuclear facilities has been designed to provide for multiple levels of inspection and verification. Licensees, contractors, and vendors each participate in a quality verification process in compliance with requirements prescribed by the NRC's rules and regulations (Title 10 Code of Federal Regulations). The NRC performs an overview of the commercial nuclear industry by inspection to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of ongoing quality verification programs

  4. 78 FR 6189 - Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor Excise...

    Science.gov (United States)

    2013-01-29

    ... 9000-AM13 Federal Acquisition Regulation; Unallowability of Costs Associated With Foreign Contractor... contractor in order to reimburse the tax imposed (26 U.S.C. 5000C Note). On February 22, 2012, DoD, GSA, and... with the statute, FAR 31.205-41 is amended to inform the Government and contractors that the costs of...

  5. Development of PRIME for irradiation performance analysis of U-Mo/Al dispersion fuel

    Energy Technology Data Exchange (ETDEWEB)

    Jeong, Gwan Yoon; Kim, Yeon Soo; Jeong, Yong Jin; Park, Jong Man; Sohn, Dong-Seong

    2018-04-01

    A prediction code for the thermo-mechanical performance of research reactor fuel (PRIME) has been developed with the implementation of developed models to analyze the irradiation behavior of U-Mo dispersion fuel. The code is capable of predicting the two-dimensional thermal and mechanical performance of U-Mo dispersion fuel during irradiation. A finite element method was employed to solve the governing equations for thermal and mechanical equilibria. Temperature-and burnup-dependent material properties of the fuel meat constituents and cladding were used. The numerical solution schemes in PRIME were verified by benchmarking solutions obtained using a commercial finite element analysis program (ABAQUS).The code was validated using irradiation data from RERTR, HAMP-1, and E-FUTURE tests. The measured irradiation data used in the validation were IL thickness, volume fractions of fuel meat constituents for the thermal analysis, and profiles of the plate thickness changes and fuel meat swelling for the mechanical analysis. The prediction results were in good agreement with the measurement data for both thermal and mechanical analyses, confirming the validity of the code. (c) 2018 Elsevier B.V. All rights reserved.

  6. International Markets: Malaysian Construction Contractors and the Stage Theory

    Directory of Open Access Journals (Sweden)

    Ahmed Awil

    2012-11-01

    Full Text Available Reduced demand for services, lack of finances for projects and idle resources at homehave resulted in loss of business for Malaysian construction contractors. Among the optionsthat are explored in this paper is internationalisation of services to help the contractorsgainfully employ their resources and diversify their markets. Integration of worldmarkets, faster transportation and improved means of communication have made it possiblefor contractors to undertake work in international markets. It was found that contractorswere motivated to internationalise by need to make the firm a viable one byconsidering the long-term profitability. Reputation and size of the firm were found to befactors that help contractors in winning contracts overseas. Most non-exporters were concernedwith provision of market intelligence and export credit finance. It was found thatproviding relevant market information, accessible to both exporter and non-exporters, canhelp firms make informed decisions. Any assistance provided should match the firm to thestage the firm has reached in exporting

  7. Government/contractor partnerships for continuous improvement. A Goddard Space Flight Center example

    Science.gov (United States)

    Tagler, Richard C.

    1992-01-01

    The efforts of a government organization and its major contractors to foster a continuous improvement environment which transcends the traditional government/contractor relationship is discussed. This relationship is aimed at communication, partnership, and trust - creating benefits for all involved.

  8. The frequency attenuation effect in identity and associative priming.

    Science.gov (United States)

    Nievas, Francisco

    2010-05-01

    Three lexical decision experiments were carried out, where the masked priming paradigm is used to study the role of the frequency attenuation effect (more priming in low-frequency target words than in high-frequency target words) in repetition and associative priming, manipulating Prime Duration (PD) and Stimulus Onset Asynchrony (SOA). A new concept was introduced, Minimum Time Threshold (MTT), this is, the minimum time interval of exposure to the masked word in order to become aware of it. Results support the notion that MTT is a key to the appearance of the frequency attenuation effect when enough word processing time is allowed. Results do not support the unified explanation of masked priming and long-term priming as proposed by Bodner and Masson (2001). Moreover, information feedback from the semantic level was not the reason for the frequency attenuation effect in repetition priming.

  9. 77 FR 20051 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2012-04-03

    ... Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor Pursuant to... ``Procedural Guidelines for the Maintenance of the List of Products Requiring Federal Contractor Certification... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor...

  10. 75 FR 28771 - Federal Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor...

    Science.gov (United States)

    2010-05-24

    ... Acquisition Regulation; FAR Case 2009-027, Personal Identity Verification of Contractor Personnel AGENCIES... of collecting from contractors all forms of Government provided identification once they are no..., titled Controls Over the Contractor Common Access Card (CAC) Life Cycle, was performed to determine...

  11. 77 FR 65927 - 60-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2012-10-31

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment... Collection: Office of Language Services Contractor Application Form. OMB Control Number: 1405-0191. Type of... become contractors for the U.S. Department of State, Office of Language Services, the information...

  12. 78 FR 13394 - 30-Day Notice of Proposed Information Collection: Office of Language Services Contractor...

    Science.gov (United States)

    2013-02-27

    ... of Language Services Contractor Application Form ACTION: Notice of request for public comment and...: Title of Information Collection: Office of Language Services Contractor Application Form. OMB Control... States. If candidates successfully become contractors for the U.S. Department of State, Office of...

  13. The decommissioning of a research reactor in the USA: A case study from planning to site release

    International Nuclear Information System (INIS)

    Boing, L.E.

    1997-01-01

    Argonne National Laboratory (ANL) has completed the D ampersand D of the Experimental Boiling Water Reactor (EBWR). The project consisted of the decontamination and/or packaging as radioactive waste the reactor vessel and internals, contaminated piping systems, miscellaneous tanks, pumps, and associated equipment. The dismantling process involved the removal and size reduction of equipment and associated plumbing, ductwork, drain lines, etc. Size reduction of reactor vessel internals was performed in the fuel pool. All radioactive and mixed waste was packaged and manifested. A thorough survey of the facility was performed after the removal of contaminated and activated material. Non-radioactive waste was disposed of in the ANL landfill or recycled as appropriate. The EBWR D ampersand D project was divided into four phases. Phases I and II were completed by ANL personnel, while Phases III and IV were done by a contractor under ANL management. The final survey was performed by the contractor, while the verification survey was performed by ANL. The project lasted 118 months. Phase I was initiated in April 1986 and the final report was issued February 1996. The duration of the project was driven by the availability of funding for decommissioning. Total exposure to project personnel was 208.7 person-mSv (20.87 person-rem), with no personnel exceeding the EBWR project dose limit of 15 mSv (1.5 rem)

  14. 42 CFR 405.1012 - When CMS or its contractors may be a party to a hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may be a party to a... Hearings § 405.1012 When CMS or its contractors may be a party to a hearing. (a) CMS and/or one or more of... unrepresented beneficiary. (b) CMS and/or the contractor(s) advises the ALJ, appellant, and all other parties...

  15. The effects of divided attention on auditory priming.

    Science.gov (United States)

    Mulligan, Neil W; Duke, Marquinn; Cooper, Angela W

    2007-09-01

    Traditional theorizing stresses the importance of attentional state during encoding for later memory, based primarily on research with explicit memory. Recent research has begun to investigate the role of attention in implicit memory but has focused almost exclusively on priming in the visual modality. The present experiments examined the effect of divided attention on auditory implicit memory, using auditory perceptual identification, word-stem completion and word-fragment completion. Participants heard study words under full attention conditions or while simultaneously carrying out a distractor task (the divided attention condition). In Experiment 1, a distractor task with low response frequency failed to disrupt later auditory priming (but diminished explicit memory as assessed with auditory recognition). In Experiment 2, a distractor task with greater response frequency disrupted priming on all three of the auditory priming tasks as well as the explicit test. These results imply that although auditory priming is less reliant on attention than explicit memory, it is still greatly affected by at least some divided-attention manipulations. These results are consistent with research using visual priming tasks and have relevance for hypotheses regarding attention and auditory priming.

  16. Affective priming using facial expressions modulates liking for abstract art.

    Science.gov (United States)

    Flexas, Albert; Rosselló, Jaume; Christensen, Julia F; Nadal, Marcos; Olivera La Rosa, Antonio; Munar, Enric

    2013-01-01

    We examined the influence of affective priming on the appreciation of abstract artworks using an evaluative priming task. Facial primes (showing happiness, disgust or no emotion) were presented under brief (Stimulus Onset Asynchrony, SOA = 20 ms) and extended (SOA = 300 ms) conditions. Differences in aesthetic liking for abstract paintings depending on the emotion expressed in the preceding primes provided a measure of the priming effect. The results showed that, for the extended SOA, artworks were liked more when preceded by happiness primes and less when preceded by disgust primes. Facial expressions of happiness, though not of disgust, exerted similar effects in the brief SOA condition. Subjective measures and a forced-choice task revealed no evidence of prime awareness in the suboptimal condition. Our results are congruent with findings showing that the affective transfer elicited by priming biases evaluative judgments, extending previous research to the domain of aesthetic appreciation.

  17. Affective priming using facial expressions modulates liking for abstract art.

    Directory of Open Access Journals (Sweden)

    Albert Flexas

    Full Text Available We examined the influence of affective priming on the appreciation of abstract artworks using an evaluative priming task. Facial primes (showing happiness, disgust or no emotion were presented under brief (Stimulus Onset Asynchrony, SOA = 20 ms and extended (SOA = 300 ms conditions. Differences in aesthetic liking for abstract paintings depending on the emotion expressed in the preceding primes provided a measure of the priming effect. The results showed that, for the extended SOA, artworks were liked more when preceded by happiness primes and less when preceded by disgust primes. Facial expressions of happiness, though not of disgust, exerted similar effects in the brief SOA condition. Subjective measures and a forced-choice task revealed no evidence of prime awareness in the suboptimal condition. Our results are congruent with findings showing that the affective transfer elicited by priming biases evaluative judgments, extending previous research to the domain of aesthetic appreciation.

  18. Assessing Contractor Capabilities for Streamlined Site Investigations

    Science.gov (United States)

    The purpose of this document is to familiarize and encourage brownfields decision makers to investigate and employ innovative methods for characterizing their sites, to assist brownfields decision makers in assessing contractors' capabilities.

  19. Object color affects identification and repetition priming.

    Science.gov (United States)

    Uttl, Bob; Graf, Peter; Santacruz, Pilar

    2006-10-01

    We investigated the influence of color on the identification of both non-studied and studied objects. Participants studied black and white and color photos of common objects and memory was assessed with an identification test. Consistent with our meta-analysis of prior research, we found that objects were easier to identify from color than from black and white photos. We also found substantial priming in all conditions, and study-to-test changes in an object's color reduced the magnitude of priming. Color-specific priming effects were large for color-complex objects, but minimal for color-simple objects. The pattern and magnitude of priming effects was not influenced either by the extent to which an object always appears in the same color (i.e., whether a color is symptomatic of an object) or by the object's origin (natural versus fabricated). We discuss the implications of our findings for theoretical accounts of object perception and repetition priming.

  20. Preserved semantic priming effect in alexia.

    Science.gov (United States)

    Mimura, M; Goodglass, H; Milberg, W

    1996-09-01

    BH, a left-handed patient with alexia and nonfluent aphasia, was presented with a lexical-decision task in which words and pronounceable pseudowords were preceded by semantically related or unrelated picture primes (Experiment 1). In Experiment 2, BH was given an explicit reading task using the word lists from Experiment 1. Performance on Experiment 2 disclosed severe reading deficits in both oral reading and semantic matching of the words to pictures. However, in Experiment 1, BH demonstrated a significant semantic priming effect, responding more accurately and more quickly to words preceded by related primes than by unrelated primes. The present results suggest that even in a patient with severe alexia, implicit access to semantic information can be preserved in the absence of explicit identification. The possibility of categorical gradient in implicit activation (living vs. nonliving) in BH was also discussed, which, however, needs to be clarified in the further investigation.

  1. Australia's First Prime Ministerial Library: Past and Future

    Science.gov (United States)

    Carman-Brown, Lesley; Henderson, Kandy-Jane; Wallace, Lesley

    2005-01-01

    In creating Australia's first prime ministerial library, a new cultural institution was developed which blends professional practice from the fields of librarianship, education, archives, journalism and museums. The John Curtin Prime Ministerial Library honours the contribution of wartime prime minister John Curtin, works towards the advancement…

  2. 76 FR 31365 - Notice of Final Determination Revising the List of Products Requiring Federal Contractor...

    Science.gov (United States)

    2011-05-31

    ... List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child Labor... Contractor Certification as to Forced or Indentured Child Labor.'' This notice adds a product, hand-woven... of the List of Products Requiring Federal Contractor Certification as to Forced or Indentured Child...

  3. Nuclear reactors for space electric power

    International Nuclear Information System (INIS)

    Buden, D.

    1978-06-01

    The Los Alamos Scientific Laboratory is studying reactor power plants for space applications in the late 1980s and 1990s. The study is concentrating on high-temperature, compact, fast reactors that can be coupled with various radiation shielding systems and thermoelectric, dynamic, or thermionic electric power conversion systems, depending on the mission. Lifetimes of 7 to 10 yr at full power, at converter operating temperatures of 1275 to 1675 0 K, are being studied. The systems are being designed such that no single-failure modes exist that will cause a complete loss of power. In fact, to meet the long lifetimes, highly redundant design features are being emphasized. Questions have been raised about safety since the COSMOS 954 incident. ''Fail-safe'' means to prevent exposure of the population to radioactive material, meeting the environmental guidelines established by the U.S. Government have been and continue to be a necessary requirement for any space reactor program. The major safety feature to prevent prelaunch and launch radioactive material hazards is not operating the reactor before achieving the prescribed orbit. Design features in the reactor ensure that accidental criticality cannot occur. High orbits (above 400 to 500 nautical miles) have sufficient lifetimes to allow radioactive elements to decay to safe levels. The major proposed applications for satellites with reactors in Earth orbit are in geosynchronous orbit (19,400 nautical miles). In missions at geosynchronous orbit, where orbital lifetimes are practically indefinite, the safety considerations are negligible. Orbits below 400 to 500 nautical miles are the ones where a safety issue is involved in case of satellite malfunction. The potential missions, the question of why reactors are being considered as a prime power candidate, reactor features, and safety considerations will be discussed

  4. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    International Nuclear Information System (INIS)

    Chockie, Alan

    2005-09-01

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  5. Safety-Related Contractor Activities at Nuclear Power Plants. New Challenges for Regulatory Oversight

    Energy Technology Data Exchange (ETDEWEB)

    Chockie, Alan [Chockie Group International, Inc., Seattle, WA (United States)

    2005-09-15

    The use of contractors has been an integral and important part of the design, construction, operation, and maintenance of nuclear power plants. To ensure the safe and efficient completion of contracted tasks, each nuclear plant licensee has developed and refined formal contract management processes to meet their specific needs and plant requirements. Although these contract management processes have proven to be effective tools for the procurement of support and components tailored to the needs of nuclear power plants, contractor-related incidents and accidents have revealed some serious weaknesses with the implementation of these processes. Identifying and addressing implementation problems are becoming more complicated due to organizational and personnel changes affecting the nuclear power industry. The ability of regulators and licensees to effectively monitor and manage the safety-related performance of contractors will likely be affected by forthcoming organization and personnel changes due to: the aging of the workforce; the decline of the nuclear industry; and the deregulation of nuclear power. The objective of this report is to provide a review of current and potential future challenges facing safety-related contractor activities at nuclear power plants. The purpose is to assist SKI in establishing a strategy for the proactive oversight of contractor safety-related activities at Swedish nuclear power plants and facilities. The nature and role of contractors at nuclear plants is briefly reviewed in the first section of the report. The second section describes the essential elements of the contract management process. Although organizations have had decades of experience with the a contract management process, there remain a number of common implantation weaknesses that have lead to serious contractor-related incidents and accidents. These implementation weaknesses are summarized in the third section. The fourth section of the report highlights the

  6. A computational approach to negative priming

    Science.gov (United States)

    Schrobsdorff, H.; Ihrke, M.; Kabisch, B.; Behrendt, J.; Hasselhorn, M.; Herrmann, J. Michael

    2007-09-01

    Priming is characterized by a sensitivity of reaction times to the sequence of stimuli in psychophysical experiments. The reduction of the reaction time observed in positive priming is well-known and experimentally understood (Scarborough et al., J. Exp. Psycholol: Hum. Percept. Perform., 3, pp. 1-17, 1977). Negative priming—the opposite effect—is experimentally less tangible (Fox, Psychonom. Bull. Rev., 2, pp. 145-173, 1995). The dependence on subtle parameter changes (such as response-stimulus interval) usually varies. The sensitivity of the negative priming effect bears great potential for applications in research in fields such as memory, selective attention, and ageing effects. We develop and analyse a computational realization, CISAM, of a recent psychological model for action decision making, the ISAM (Kabisch, PhD thesis, Friedrich-Schiller-Universitat, 2003), which is sensitive to priming conditions. With the dynamical systems approach of the CISAM, we show that a single adaptive threshold mechanism is sufficient to explain both positive and negative priming effects. This is achieved by comparing results obtained by the computational modelling with experimental data from our laboratory. The implementation provides a rich base from which testable predictions can be derived, e.g. with respect to hitherto untested stimulus combinations (e.g. single-object trials).

  7. The effect of unimodal affective priming on dichotic emotion recognition.

    Science.gov (United States)

    Voyer, Daniel; Myles, Daniel

    2017-11-15

    The present report concerns two experiments extending to unimodal priming the cross-modal priming effects observed with auditory emotions by Harding and Voyer [(2016). Laterality effects in cross-modal affective priming. Laterality: Asymmetries of Body, Brain and Cognition, 21, 585-605]. Experiment 1 used binaural targets to establish the presence of the priming effect and Experiment 2 used dichotically presented targets to examine auditory asymmetries. In Experiment 1, 82 university students completed a task in which binaural targets consisting of one of 4 English words inflected in one of 4 emotional tones were preceded by binaural primes consisting of one of 4 Mandarin words pronounced in the same (congruent) or different (incongruent) emotional tones. Trials where the prime emotion was congruent with the target emotion showed faster responses and higher accuracy in identifying the target emotion. In Experiment 2, 60 undergraduate students participated and the target was presented dichotically instead of binaurally. Primes congruent with the left ear produced a large left ear advantage, whereas right congruent primes produced a right ear advantage. These results indicate that unimodal priming produces stronger effects than those observed under cross-modal priming. The findings suggest that priming should likely be considered a strong top-down influence on laterality effects.

  8. Fusion Safety Program annual report, Fiscal Year 1993

    International Nuclear Information System (INIS)

    Longhurst, G.R.; Cadwallader, L.C.; Dolan, T.J.; Herring, J.S.; McCarthy, K.A.; Merrill, B.J.; Motloch, C.G.; Petti, D.A.

    1993-12-01

    This report summarizes the major activities of the Fusion Safety Program in Fiscal Year 1993. The Idaho National Engineering Laboratory (INEL) has been designated by DOE as the lead laboratory for fusion safety, and EG ampersand G Idaho, Inc., is the prime contractor for INEL operations. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL and in participating organizations, including universities and private companies. Technical areas covered in the report include tritium safety, beryllium safety, activation product release, reactions involving potential plasma-facing materials, safety of fusion magnet systems, plasma disruptions and edge physics modeling, risk assessment failure rates, computer codes for reactor transient analysis, and regulatory support. These areas include work completed in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed at the INEL for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor projects at the Princeton Plasma Physics Laboratory and a summary of the technical support for the ARIES/PULSAR commercial reactor design studies

  9. Fusion Safety Program annual report, fiscal year 1992

    International Nuclear Information System (INIS)

    Holland, D.F.; Cadwallader, L.C.; Herring, J.S.; Longhurst, G.R.; McCarthy, K.A.; Merrill, B.J.; Piet, S.J.

    1993-01-01

    This report summarizes the major activities of the Fusion Safety Program in fiscal year 1992. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and EG ampersand G Idaho, Inc. is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL and in participating organizations including the Westinghouse Hanford Company at the Hanford Engineering Development Laboratory, the Massachusetts Institute of Technology, and the University of Wisconsin. The technical areas covered in the report include tritium safety, activation product release, reactions involving beryllium, reactions involving lithium breeding materials, safety of fusion magnet systems, plasma disruptions, risk assessment failure rate data base, and computer code development for reactor transients. Also included in the report is a summary of the safety and environmental studies performed by the INEL for the Tokamak Physics Experiments and the Tokamak Fusion Test Reactor, the safety analysis for the International Thermonuclear Experimental Reactor design, and the technical support for the ARIES commercial reactor design study

  10. UP1 decommissioning project: initial review of lessons learned

    International Nuclear Information System (INIS)

    Fontana, Ph.; Fraize, G.; Seurat, Ph.

    2008-01-01

    The very first French electricity-generating nuclear reactors (3 gas-graphite reactors operated between 1956 and 1984) and spent fuel reprocessing plant (UP1 and ancillary facilities operated from 1958 to 1997) were located at Marcoule, in southern France. These historic facilities, together with the research labs that contributed to the development and commissioning of the processes implemented, are being decontaminated and dismantled. Other facilities near these nuclear plants will also be shut down in the next few years: the Phenix fast breeder reactor, the Celestin reactors and other ancillary units. Because the UP1 reprocessing plant and its related facilities were used for both commercial and defense activities, a dedicated group comprising three state-owned or private companies (CEA, EdF and COGEMA) was set up as the contracting authority from 1996 to 2004. Today the CEA is the contracting authority at Marcoule and has replaced AREVA NC as the site nuclear operator. AREVA acts as prime contractor for both operation of the main facilities and engineering of the dismantling projects. (authors)

  11. UP1 decommissioning project: initial review of lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Fontana, Ph.; Fraize, G. [CEA Valrho, Dir. de l' Energie Nucleaire (DEN/DPAD), 30 - Marcoule (France); Seurat, Ph. [AREVA NC, 75 - Paris (France)

    2008-07-01

    The very first French electricity-generating nuclear reactors (3 gas-graphite reactors operated between 1956 and 1984) and spent fuel reprocessing plant (UP1 and ancillary facilities operated from 1958 to 1997) were located at Marcoule, in southern France. These historic facilities, together with the research labs that contributed to the development and commissioning of the processes implemented, are being decontaminated and dismantled. Other facilities near these nuclear plants will also be shut down in the next few years: the Phenix fast breeder reactor, the Celestin reactors and other ancillary units. Because the UP1 reprocessing plant and its related facilities were used for both commercial and defense activities, a dedicated group comprising three state-owned or private companies (CEA, EdF and COGEMA) was set up as the contracting authority from 1996 to 2004. Today the CEA is the contracting authority at Marcoule and has replaced AREVA NC as the site nuclear operator. AREVA acts as prime contractor for both operation of the main facilities and engineering of the dismantling projects. (authors)

  12. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  13. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  14. Stress priming in picture naming: an SOA study.

    Science.gov (United States)

    Schiller, Niels O; Fikkert, Paula; Levelt, Clara C

    2004-01-01

    This study investigates whether or not the representation of lexical stress information can be primed during speech production. In four experiments, we attempted to prime the stress position of bisyllabic target nouns (picture names) having initial and final stress with auditory prime words having either the same or different stress as the target (e.g., WORtel-MOtor vs. koSTUUM-MOtor; capital letters indicate stressed syllables in prime-target pairs). Furthermore, half of the prime words were semantically related, the other half unrelated. Overall, picture names were not produced faster when the prime word had the same stress as the target than when the prime had different stress, i.e., there was no stress-priming effect in any experiment. This result would not be expected if stress were stored in the lexicon. However, targets with initial stress were responded to faster than final-stress targets. The reason for this effect was neither the quality of the pictures nor frequency of occurrence or voice-key characteristics. We hypothesize here that this stress effect is a genuine encoding effect, i.e., words with stress on the second syllable take longer to be encoded because their stress pattern is irregular with respect to the lexical distribution of bisyllabic stress patterns, even though it can be regular with respect to metrical stress rules in Dutch. The results of the experiments are discussed in the framework of models of phonological encoding.

  15. Criticality safety engineering at the Savannah River Site - the 1990s

    International Nuclear Information System (INIS)

    Chandler, J.R.; Apperson, C.E. Jr.

    1996-01-01

    The privatization and downsizing effort that is ongoing within the U.S. Department of Energy (DOE) is requiring a change in the management of criticality safety engineering resources at the Savannah River Site (SRS). Downsizing affects the number of criticality engineers employed by the prime contractor, Westinghouse Savannah River Company (WSRC), and privatization affects the manner in which business is conducted. In the past, criticality engineers at the SRS have been part of the engineering organizations that support each facility handling fissile material. This practice led to different criticality safety engineering organizations dedicated to fuel fabrication activities, reactor loading and unloading activities, separation and waste management operations, and research and development

  16. Low and medium activity nuclear waste disposal characterisation laboratory. Example of Spanish E1 Cabril Disposal Centre Laboratory

    International Nuclear Information System (INIS)

    Boulanger, G.; Augustin, X.

    1993-01-01

    Low and medium activity radioactive waste generated in Spain by power reactors, research laboratories, etc. is stored in the E1 Cabril Disposal Centre. This Centre, based on a French design, provides a characterisation function for the stored waste and corresponding containers. Technicatome, prime contractor for the French disposal centre, and contributing to the design and construction of the E1 Cabril Centre, played an important part in the R and D work for this laboratory, and the manufacture of certain items of equipment. This laboratory, applying experience acquired in France by the CEA, comprises a set of buildings providing for active and inactive test operations

  17. Job analysis of nuclear power reactor health physics technicians

    International Nuclear Information System (INIS)

    Davis, L.T.; Mazour, T.J.; Clark, P.V.; Todd, R.C.; Marotta, F.J.

    1984-06-01

    This report describes a project, an industry-wide Job Analysis of Nuclear Power Reactor Health Physics Technicians (HPTs), conducted by Brookhaven National Laboratory and Analysis and Technology, Inc. to provide the industry with job-performance data that can be used in systematically defining training programs in terms of required job functions responsibilities, and performance standards. The job-analysis methodology is consistent with that used by the Institute of Nuclear Power Operations (INPO) in similar industry-wide projects and includes administration of over 850 job task questionnaires to utility and contractor Health Physics Technicians throughout the country. Data collected includes task performance (difficulty, importance, and frequency) and industry-wide demographics (job levels, experience, education, and training). The results of this project discussed herein include model job descriptions for HPT positions, summaries of HPT experience, education, and training, industry-wide task listings with task-performance characteristics, and recommendations of selected tasks as a basis for HPT training development. Finally, potential future applications of the data base by utility and contractor organizations in training program development and evaluation and personnel qualifications are discussed

  18. Operations Strategy and –Innovation? -A Contractor Implementing Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Simonsen, Rolf

    2006-01-01

    Traditional strategic management and operations strategy wants us to believe that the implementation of management concepts is a simple strategic choice made by top managers. In this paper we introduce the story of Lean Construction entering into the organisation of a Danish contractor. Lean...... concepts. The paper presents findings from empirical work in collaboration with a large Danish contractor. The case is analysed from the perspective of operation strategy and political process. It is observed how the management concept is socially constructed and negotiated through political action of key...

  19. HANFORDS PUBLIC TOUR PROGRAM - AN EXCELLENT EDUCATIONAL TOOL

    Energy Technology Data Exchange (ETDEWEB)

    SINCLAIR KM

    2010-12-07

    Prior to 2001, the Department of Energy (DOE) sponsored limited tours of the Hanford Site for the public, but discontinued the program after the 9/11 terrorist attacks on the U.S. In 2003, DOE's Richland Operations Office (DOE-RL) requested the site's prime contractor to reinstate the public tour program starting in 2004 under strict controls and security requirements. The planning involved a collaborative effort among the security, safety and communications departments of DOE-RL and the site's contracting companies. This paper describes the evolution of, and enhancements to, Hanford's public tours, including the addition of a separate tour program for the B Reactor, the first full-scale nuclear reactor in the world. Topics included in the discussion include the history and growth of the tour program, associated costs, and visitor surveys and assessments.

  20. 77 FR 35883 - Defense Federal Acquisition Regulation Supplement; Contractors Performing Private Security...

    Science.gov (United States)

    2012-06-15

    .... The essence of the definition cannot be changed substantially in the DFARS from that in the... recommended that the final rule define the contractor's obligation to cooperate, as in the mandatory... define the scope and limitations of the contractor's obligation to cooperate with Government...

  1. 29 CFR 471.16 - Under what circumstances may a contractor be reinstated?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS OBLIGATIONS OF FEDERAL CONTRACTORS AND SUBCONTRACTORS; NOTIFICATION OF EMPLOYEE RIGHTS UNDER FEDERAL LABOR LAWS General Enforcement... 29 Labor 2 2010-07-01 2010-07-01 false Under what circumstances may a contractor be reinstated...

  2. Specific and non-specific match effects in negative priming.

    Science.gov (United States)

    Labossière, Danielle I; Leboe-McGowan, Jason P

    2018-01-01

    The negative priming effect occurs when withholding a response to a stimulus impairs generation of subsequent responding to a same or a related stimulus. Our goal was to use the negative priming procedure to obtain insights about the memory representations generated by ignoring vs. attending/responding to a prime stimulus. Across three experiments we observed that ignoring a prime stimulus tends to generate higher identity-independent, non-specific repetition effects, owing to an overlap in the coarse perceptual form of a prime distractor and a probe target. By contrast, attended repetition effects generate predominantly identity-specific sources of facilitation. We use these findings to advocate for using laboratory phenomena to illustrate general principles that can be of practical use to non-specialists. In the case of the negative priming procedure, we propose that the procedure provides a useful means for investigating attention/memory interactions, even if the specific cause (or causes) of negative priming effects remain unresolved. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. The impact of auditory white noise on semantic priming.

    Science.gov (United States)

    Angwin, Anthony J; Wilson, Wayne J; Copland, David A; Barry, Robert J; Myatt, Grace; Arnott, Wendy L

    2018-04-10

    It has been proposed that white noise can improve cognitive performance for some individuals, particularly those with lower attention, and that this effect may be mediated by dopaminergic circuitry. Given existing evidence that semantic priming is modulated by dopamine, this study investigated whether white noise can facilitate semantic priming. Seventy-eight adults completed an auditory semantic priming task with and without white noise, at either a short or long inter-stimulus interval (ISI). Measures of both direct and indirect semantic priming were examined. Analysis of the results revealed significant direct and indirect priming effects at each ISI in noise and silence, however noise significantly reduced the magnitude of indirect priming. Analyses of subgroups with higher versus lower attention revealed a reduction to indirect priming in noise relative to silence for participants with lower executive and orienting attention. These findings suggest that white noise focuses automatic spreading activation, which may be driven by modulation of dopaminergic circuitry. Copyright © 2018 Elsevier Inc. All rights reserved.

  4. UWTOR-M, a stellarator power reactor utilizing modular coils

    International Nuclear Information System (INIS)

    Sviatoslavsky, I.N.; Van Sciver, S.W.; Kulcinski, G.L.

    1981-10-01

    We briefly describe the parametric considerations which led to the UWTOR-M reference design point. The design has 18 twisted coils utilizing a multipolarity of 3, a major radius of 24 m, a coil radius of 4.77 m and a plasma aspect ratio of 14. An assumed β of 5% was used. This configuration leads to a rotational transform on the edge of 1.125 giving favorable plasma physics conditions. The natural stellarator divertor is used for impurity control in conjunction with innovative high performance divertor targets. A unique blanket design is proposed which minimizes tritium inventory in the reactor. Finally, since maintainability is a prime consideration, we describe a scheme for servicing the first wall/blanket and other reactor components

  5. Bounded Gaps between Products of Special Primes

    Directory of Open Access Journals (Sweden)

    Ping Ngai Chung

    2014-03-01

    Full Text Available In their breakthrough paper in 2006, Goldston, Graham, Pintz and Yıldırım proved several results about bounded gaps between products of two distinct primes. Frank Thorne expanded on this result, proving bounded gaps in the set of square-free numbers with r prime factors for any r ≥ 2, all of which are in a given set of primes. His results yield applications to the divisibility of class numbers and the triviality of ranks of elliptic curves. In this paper, we relax the condition on the number of prime factors and prove an analogous result using a modified approach. We then revisit Thorne’s applications and give a better bound in each case.

  6. Negative Priming in Free Recall Reconsidered

    Science.gov (United States)

    Hanczakowski, Maciej; Beaman, C. Philip; Jones, Dylan M.

    2016-01-01

    Negative priming in free recall is the finding of impaired memory performance when previously ignored auditory distracters become targets of encoding and retrieval. This negative priming has been attributed to an aftereffect of deploying inhibitory mechanisms that serve to suppress auditory distraction and minimize interference with learning and…

  7. Independent Confirmatory Survey Report for the University of Arizona Nuclear Reactor Laboratory, Tucson, Arizona DCN:2051-SR-01-0

    International Nuclear Information System (INIS)

    Altic, Nick A.

    2011-01-01

    The University of Arizona (University) research reactor is a TRIGA swimming pool type reactor designed by General Atomics and constructed at the University in 1958. The reactor first went into operation in December of 1958 under U.S. Nuclear Regulatory Commission (NRC) license R-52 until final shut down on May 18, 2010. Initial site characterization activities were conducted in February 2009 during ongoing reactor operations to assess the radiological status of the Nuclear Reactor Laboratory (NRL) excluding the reactor tank, associated components, and operating systems. Additional post-shutdown characterization activities were performed to complete characterization activities as well as verify assumptions made in the Decommissioning Plan (DP) that were based on a separate activation analysis (ESI 2009 and WMG 2009). Final status survey (FSS) activities began shortly after the issuance of the FSS plan in May 2011. The contractor completed measurement and sampling activities during the week of August 29, 2011.

  8. Research reactor decommissioning planning - It is never too early to start

    International Nuclear Information System (INIS)

    Eby, R.S.; Buttram, C.; Ervin, P.; Lundberg, L.; Hertel, N.; Marske, S.G.

    2003-01-01

    Whether an organization is in the process of designing, constructing or operating nuclear research reactors, past experiences prove it is never too early to start planning for the eventual decontamination, dismantlement and decommissioning (DD and D) of the reactor. If one waits until writing the Decommissioning Plan to seriously think about the DD and D activities, they have lost a key opportunity to be able to efficiently and effectively carry out the DD and D activities and will end up spending large sums of unnecessary funds during the DD and D. This paper will review all phases of research reactor decommissioning from characterization through planning, to eventual DD and D and license termination and highlight areas where early planning can significantly reduce the financial, safety and schedule risks associated with the DD and D activities. CH2M HILL served as the Executive Engineer for the Georgia Institute of Technology and the State of Georgia to oversee the successful DD and D of their tank type research reactor. CH2M HILL is currently serving as the DD and D contractor for the University of Virginia pool type UVAR and the low power CAVALIER research reactors and as the characterization and Decommissioning Planning contractor for the University of Michigan Ford Nuclear Reactor. Through these activities, an array of lessons learned have been compiled that will prove invaluable to the research reactor owner when they eventually face the DD and D challenge. As an example, in almost every case CH2M HILL has been involved in reactor DD and D, less than adequate up-front characterization has significantly impacted the ultimate DD and D process cost and schedule. Due to regulatory reasons, intrusive characterization may not always be possible prior to DD and D. However, a thorough understanding of the materials of construction and the quantities of additives or impurities present in those materials; e.g., cobalt in stainless steel, rare earth elements or

  9. 48 CFR 2945.104 - Review and correction of contractors' property control systems.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Review and correction of... contractors' property control systems. When the Government's property administrator determines that review and... administrator must review the system to determine whether the contractor will be able to meet the requirements...

  10. Metropolitan Optical Networks 1996 Annual Report

    DEFF Research Database (Denmark)

    Kristensen, Martin; Jouanno, Jean-Marc; Malone, Kevin

    1997-01-01

    The report desribes the reasearch carried out in the ACTS-project METON (Metropolitan Optical Networks) in 1996. L.M. Ericsson is prime contractor and 12 partners are involved in the project including DTU, i.e. EMI and MIC.......The report desribes the reasearch carried out in the ACTS-project METON (Metropolitan Optical Networks) in 1996. L.M. Ericsson is prime contractor and 12 partners are involved in the project including DTU, i.e. EMI and MIC....

  11. Novel Word Lexicalization and the Prime Lexicality Effect

    Science.gov (United States)

    Qiao, Xiaomei; Forster, Kenneth I.

    2013-01-01

    This study investigates how newly learned words are integrated into the first-language lexicon using masked priming. Two lexical decision experiments are reported, with the aim of establishing whether newly learned words behave like real words in a masked form priming experiment. If they do, they should show a prime lexicality effect (PLE), in…

  12. Examining the Dynamics of Novation from the Principal Contractor's and Architect's Perspectives

    Directory of Open Access Journals (Sweden)

    Alan Griffith

    2012-11-01

    Full Text Available Design and build is a popular form of procurement worldwide. In its conventional form, it is characterised by the integration between design and construction. Novation, a variant of design and build where design responsibility is transferred from designer to contractor as procurement evolves, has gained in popularity. However, the characteristics of the process, although well identified, continue to create confusion and problems for clients and contractors alike. This paper focuses on the dynamics of design and build novation from the principal contractor's and architect's perspectives. It embraces key aspects of both the pre-contract and post-contract environment. Its contribution forms a part of a major UK Government funded research project investigating design and build best practice. The findings presented in this paper broadly indicate that contractors believe novated design and build can be disadvantageous and that considerable fragmentation can be created in what should be an integrated procurement approach.

  13. Identity negative priming: a phenomenon of perception, recognition or selection?

    Directory of Open Access Journals (Sweden)

    Hecke Schrobsdorff

    Full Text Available The present study addresses the problem whether negative priming (NP is due to information processing in perception, recognition or selection. We argue that most NP studies confound priming and perceptual similarity of prime-probe episodes and implement a color-switch paradigm in order to resolve the issue. In a series of three identity negative priming experiments with verbal naming response, we determined when NP and positive priming (PP occur during a trial. The first experiment assessed the impact of target color on priming effects. It consisted of two blocks, each with a different fixed target color. With respect to target color no differential priming effects were found. In Experiment 2 the target color was indicated by a cue for each trial. Here we resolved the confounding of perceptual similarity and priming condition. In trials with coinciding colors for prime and probe, we found priming effects similar to Experiment 1. However, trials with a target color switch showed such effects only in trials with role-reversal (distractor-to-target or target-to-distractor, whereas the positive priming (PP effect in the target-repetition trials disappeared. Finally, Experiment 3 split trial processing into two phases by presenting the trial-wise color cue only after the stimulus objects had been recognized. We found recognition in every priming condition to be faster than in control trials. We were hence led to the conclusion that PP is strongly affected by perception, in contrast to NP which emerges during selection, i.e., the two effects cannot be explained by a single mechanism.

  14. Can False Memories Prime Problem Solutions?

    Science.gov (United States)

    Howe, Mark L.; Garner, Sarah R.; Dewhurst, Stephen A.; Ball, Linden J.

    2010-01-01

    Previous research has suggested that false memories can prime performance on related implicit and explicit memory tasks. The present research examined whether false memories can also be used to prime higher order cognitive processes, namely, insight-based problem solving. Participants were asked to solve a number of compound remote associate task…

  15. Process waste assessment approach, training and technical assistance for DOE contractors

    International Nuclear Information System (INIS)

    Pemberton, S.

    1994-03-01

    The Department of Energy (DOE) and its contractors are faced with a large waste management problem as are other industries. One of the tools used in a successful waste minimization pollution prevention (WMin/P2) program is a process waste assessment (PWA). The purpose of this project was to share the Kansas City Plant's (KCP's) PWA expertise with other DOE personnel and DOE contractors. This consisted of two major activities: (1) The KCP's PWA graded approach methodology was modified with the assistance of DOE/Defense Program's laboratories, and (2) PWA training and technical assistance were provided to interested DOE personnel and DOE contractors. This report documents the FY93 efforts, lesson learned, and future plans for both PWA-related activities

  16. Excessive Profits of German Defense Contractors

    Science.gov (United States)

    2014-09-01

    its business unit Thyssen Krupp Marine Systems, is a German defense contractor. (2) Tognom AG Tognum AG owned the MTU Friedrichshafen GmbH before... Friedrichshafen provided engines for many ships of the German Navy and for German battle tanks, such as the Leopard I and Leopard II. MTU refers to the

  17. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  18. Affective Priming in Major Depressive Disorder

    Directory of Open Access Journals (Sweden)

    Joelle eLeMoult

    2012-10-01

    Full Text Available Research on cognitive biases in depression has provided considerable evidence for the impact of emotion on cognition. Individuals with depression tend to preferentially process mood-congruent material and to show deficits in the processing of positive material leading to biases in attention, memory, and judgments. More research is needed, however, to fully understand which cognitive processes are affected. The current study further examines the impact of emotion on cognition using a priming design with facial expressions of emotion. Specifically, this study tested whether the presentation of facial expressions of emotion affects subsequent processing of affective material in participants with major depressive disorder (MDD and healthy controls (CTL. Facial expressions displaying happy, sad, angry, disgusted, or neutral expressions were presented as primes for 500ms, and participants’ speed to identify a subsequent target’s emotional expression was assessed. All participants displayed greater interference from emotional versus neutral primes, marked by slower response times to judge the emotion of the target face when it was preceded by an emotional prime. Importantly, the CTL group showed the strongest interference when happy emotional expressions served as primes whereas the MDD group failed to show this bias. These results add to a growing literature that shows that depression is associated with difficulties in the processing of positive material.

  19. A review of fast reactor program in Japan - April 1984

    International Nuclear Information System (INIS)

    Matsuno, Y.

    1984-01-01

    The fast breeder reactor development project in PNC has been in progress steadily in these eighteen years. Concerning the experimental fast reactor, JOYO, the MK-II core attained criticality on November 22, 1982 with 51 fuel assemblies, and received the ''Certificate of Inspection before Operation'' from Government Authority on March 31, 1983, after 100 hours operation with the rated output of 100 MW. Since then, the core has been utilized to implement irradiation bed characteristics test, and to irradiate fuels and structural materials especially for the prototype reactor MONJU. With respect to the prototype reactor MONJU, the installation permit was issued on May 27, 1983, from the prime minister, and the contracts of the first stage between PNC and fabricators were made recently. At the same time, almost all the licenses of preparatory construction works were issued by March 1983, and preparatory construction works were started in April 1983. On the other hand, conceptual design of a demonstration reactor is now under way in a close cooperation with concerned authorities and utilities, as well as investigations of the way of conducting necessary research and development

  20. 2012 Suwannee River Water Management District (SRWMD) Lidar: Bradford (FL)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — USGS - Suwannee River Water Management District Contract No.G10PC00093, Task Order No.G12PD00242 Prime Contractor: Digital Aerial Solutions (DAS) Sub-Contractor:...

  1. Instant PrimeFaces starter

    CERN Document Server

    Hlavats, Ian

    2013-01-01

    Get to grips with a new technology, understand what it is and what it can do for you, and then get to work with the most important features and tasks. Instant Primefaces Starter is a fast-paced, introductory guide designed to give you all the information you need to start using Primfaces, instantly.Instant PrimeFaces Starter is great for developers looking to get started quickly with PrimeFaces. It's assumed that you have some JSF experience already, as well as familiarity with other Java technologies such as CDI and JPA and an understanding of MVC principles, object-relational mapping (ORM),

  2. Facial expression primes and implicit regulation of negative emotion.

    Science.gov (United States)

    Yoon, HeungSik; Kim, Shin Ah; Kim, Sang Hee

    2015-06-17

    An individual's responses to emotional information are influenced not only by the emotional quality of the information, but also by the context in which the information is presented. We hypothesized that facial expressions of happiness and anger would serve as primes to modulate subjective and neural responses to subsequently presented negative information. To test this hypothesis, we conducted a functional MRI study in which the brains of healthy adults were scanned while they performed an emotion-rating task. During the task, participants viewed a series of negative and neutral photos, one at a time; each photo was presented after a picture showing a face expressing a happy, angry, or neutral emotion. Brain imaging results showed that compared with neutral primes, happy facial primes increased activation during negative emotion in the dorsal anterior cingulated cortex and the right ventrolateral prefrontal cortex, which are typically implicated in conflict detection and implicit emotion control, respectively. Conversely, relative to neutral primes, angry primes activated the right middle temporal gyrus and the left supramarginal gyrus during the experience of negative emotion. Activity in the amygdala in response to negative emotion was marginally reduced after exposure to happy primes compared with angry primes. Relative to neutral primes, angry facial primes increased the subjectively experienced intensity of negative emotion. The current study results suggest that prior exposure to facial expressions of emotions modulates the subsequent experience of negative emotion by implicitly activating the emotion-regulation system.

  3. Masked priming for the comparative evaluation of camouflage conspicuity.

    Science.gov (United States)

    Brunyé, Tad T; Eddy, Marianna D; Cain, Matthew S; Hepfinger, Lisa B; Rock, Kathryn

    2017-07-01

    Human observer test and evaluation of camouflage patterns is critical for understanding relative pattern conspicuity against a range of background scenes. However, very few validated methodologies exist for this purpose, and those that do carry several limitations. Five experiments examined whether masked priming with a dot probe could be used to reliably differentiate camouflage patterns. In each experiment, participants were primed with a camouflaged target appearing on the left or right of the screen, and then made a speeded response to a dot probe appearing on the same (congruent) or different (incongruent) side. Across experiments we parametrically varied prime duration between 35, 42, 49, 56, and 63 ms. Results demonstrated that as prime duration increased, a response time disadvantage for incongruent trials emerged with certain camouflage patterns. Interestingly, the most conspicuous patterns showed behavioral differences at a relatively brief (49 ms) prime duration, whereas behavioral differences were only found at longer prime durations for less conspicuous patterns; this overall results pattern matched that predicted by a visual salience model. Together, we demonstrate the viability of masked priming for the test and evaluation of camouflage patterns, and correlated outcomes for saliency models and primed object processing. Published by Elsevier Ltd.

  4. Long-term repetition priming with symmetrical polygons and words.

    Science.gov (United States)

    Kersteen-Tucker, Z

    1991-01-01

    In two different tasks, subjects were asked to make lexical decisions (word or nonword) and symmetry judgments (symmetrical or nonsymmetrical) about two-dimensional polygons. In both tasks, every stimulus was repeated at one of four lags (0, 1, 4, or 8 items interposed between the first and second stimulus presentations). This paradigm, known as repetition priming, revealed comparable short-term priming (Lag 0) and long-term priming (Lags 1, 4, and 8) both for symmetrical polygons and for words. A shorter term component (Lags 0 and 1) of priming was observed for nonwords, and only very short-term priming (Lag 0) was observed for nonsymmetrical polygons. These results indicate that response facilitation accruing from repeated exposure can be observed for stimuli that have no preexisting memory representations and suggest that perceptual factors contribute to repetition-priming effects.

  5. Semantic Priming for Coordinate Distant Concepts in Alzheimer's Disease Patients

    Science.gov (United States)

    Perri, R.; Zannino, G. D.; Caltagirone, C.; Carlesimo, G. A.

    2011-01-01

    Semantic priming paradigms have been used to investigate semantic knowledge in patients with Alzheimer's disease (AD). While priming effects produced by prime-target pairs with associative relatedness reflect processes at both lexical and semantic levels, priming effects produced by words that are semantically related but not associated should…

  6. 42 CFR 405.1010 - When CMS or its contractors may participate in an ALJ hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false When CMS or its contractors may participate in an... Hearings § 405.1010 When CMS or its contractors may participate in an ALJ hearing. (a) An ALJ may request, but may not require, CMS and/or one or more of its contractors to participate in any proceedings...

  7. Occupational dose reduction at Department of Energy contractor facilities: Study of ALARA programs

    International Nuclear Information System (INIS)

    Dionne, B.J.; Meinhold, C.B.; Khan, T.A.; Baum, J.W.

    1992-03-01

    This report provides the US Department of Energy (DOE) and its contractors with information that will be useful for reducing occupational radiation doses at DOE's nuclear facilities. In 1989 and 1990, health physicists from the Brookhaven National Laboratory's (BNL) ALARA Center visited twelve DOE contractor facilities with annual collective dose equivalents greater than 100 person-rem (100 person-cSv). The health physicists interviewed radiological safety staff, engineers, and training personnel who were responsible for dose control. The status of ALARA practices at the major contractor facilities was compared with the requirements and recommendation in DOE Order 5480.11 ''Radiation Protection for Occupational Workers'' and PNL-6577 ''Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are as Low as Reasonably Achievable.'' The information and data collected are described and examples of successful practices are presented. The findings on the status of the DOE Contractor ALARA Programs are summarized and evaluated. In addition, the supplement to this report contains examples of good-practice documents associated with implementing the major elements of a formally documented ALARA program for a major DOE contractor facility

  8. Problems of two-phase flows in water cooled and moderated reactors

    International Nuclear Information System (INIS)

    Syu, Yu.

    1984-01-01

    Heat exchange in two-phase flows of coolant in loss of coolant accidents in PWR and BWR reactors has been investigated. Three main stages of accident history are considered: blowdown, reflooding using emergency core cooling system and rewetting. Factors, determining the rate of coolant leakage and the rate of temperature increase in fuel cladding during blowdown, processes of vapour during reflooding and liquid priming by vapour during rewetting, are discussed

  9. Syntactic Priming.

    Science.gov (United States)

    Nicol, Janet L.

    1996-01-01

    Reviews the syntactic priming task, a paradigm involving the presentation of a phrasal or clausal context, followed by the presentation of a target item for lexical decision or naming. Notes that response times are faster for targets syntactically congruent with the preceding context than for incongruent targets. Outlines how to administer this…

  10. A prime a day keeps calories away: The effects of supraliminal priming on food consumption and the moderating role of gender and eating restraint.

    Science.gov (United States)

    Minas, Randall K; Poor, Morgan; Dennis, Alan R; Bartelt, Valerie L

    2016-10-01

    The link between intentions and action in weight control is weaker than previously thought, so recent research has called for further investigation of ways to improve weight control that bypass conscious intentions. Priming has been shown to have effects on individual behavior in a variety of contexts by influencing subconscious cognition. This paper investigates the effects of semantic priming using healthy body image, goal-oriented words on food consumption. The moderating role of both restrained eating and gender is investigated. 161 participants were involved in an experiment using a novel version of a scrambled sentence priming game. The outcome measure was the number of kilocalories consumed, examined using a between subjects ANCOVA with priming, gender, restrained eating index, self-reported BMI, and two interaction terms (primingxgender, and primingxrestrained eating index). There was no main effect of priming but there was an interaction of priming with gender. Females consumed significantly fewer kilocalories after being exposed to priming words related to a healthy body image (i.e. "slim", "fit,") compared to females receiving the neutral prime, with a medium effect size (d = 0.58). The body image prime did not significantly affect food intake for males, nor did it have a differential effect on restrained eaters. This study shows that priming can be an effective method for influencing females to reduce food intake, regardless of whether they are restrained or unrestrained eaters. Future studies could investigate whether different priming words related to a male's healthy body image goal (i.e. "buff," "muscles," etc.) would similarly reduce food intake for males. Copyright © 2016. Published by Elsevier Ltd.

  11. United States Domestic Research Reactor Infrastructure - TRIGA Reactor Fuel Support

    International Nuclear Information System (INIS)

    Morrell, Douglas

    2008-01-01

    The purpose of the United State Domestic Research Reactor Infrastructure Program is to provide fresh nuclear reactor fuel to United States universities at no, or low, cost to the university. The title of the fuel remains with the United States government and when universities are finished with the fuel, the fuel is returned to the United States government. The program is funded by the United States Department of Energy - Nuclear Energy division, managed by Department of Energy - Idaho Field Office, and contracted to the Idaho National Laboratory's Management and Operations Contractor - Battelle Energy Alliance. Program has been at Idaho since 1977 and INL subcontracts with 26 United States domestic reactor facilities (13 TRIGA facilities, 9 plate fuel facilities, 2 AGN facilities, 1 Pulstar fuel facility, 1 Critical facility). University has not shipped fuel since 1968 and as such, we have no present procedures for shipping spent fuel. In addition: floor loading rate is unknown, many interferences must be removed to allow direct access to the reactor tank, floor space in the reactor cell is very limited, pavement ends inside our fence; some of the surface is not finished. The whole approach is narrow, curving and downhill. A truck large enough to transport the cask cannot pull into the lot and then back out (nearly impossible / refused by drivers); a large capacity (100 ton), long boom crane would have to be used due to loading dock obstructions. Access to the entrance door is on a sidewalk. The campus uses it as a road for construction equipment, deliveries and security response. Large trees are on both sides of sidewalk. Spent fuel shipments have never been done, no procedures approved or in place, no approved casks, no accident or safety analysis for spent fuel loading. Any cask assembly used in this facility will have to be removed from one crane, moved on the floor and then attached to another crane to get from the staging area to the reactor room. Reactor

  12. Euclidean Primes Have the Minimum Number of Primitive Roots

    Czech Academy of Sciences Publication Activity Database

    Křížek, Michal; Somer, L.

    2008-01-01

    Roč. 12, č. 1 (2008), s. 121-127 ISSN 0972-5555 R&D Projects: GA AV ČR(CZ) IAA100190803 Institutional research plan: CEZ:AV0Z10190503 Keywords : Euclidean primes * Fermat primes * Sophie Germain primes Subject RIV: BA - General Mathematics

  13. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    Science.gov (United States)

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  14. Italy's Prime Minister visits CERN

    CERN Multimedia

    Stefania Pandolfi

    2015-01-01

    On Tuesday, 7 July 2015, the Prime Minister of the Italian Republic, Matteo Renzi, visited CERN. He was accompanied by a delegation that included Italy's Minister for Education, University and Research, Stefania Giannini.   From left to right: Fernando Ferroni, President of the Istituto Nazionale di Fisica Nucleare (INFN); Sergio Bertolucci, CERN Director for Research and Scientific Computing; Stefania Giannini, Italy's Minister of Education, University and Research; Matteo Renzi, Prime Minister of the Italian Republic; Fabiola Gianotti, CERN Director-General Designate; Rolf Heuer, CERN Director-General.   The Prime Minister was welcomed by members of the CERN Management together with former CERN Director-General and Senator for Life of the Italian Republic, Carlo Rubbia. After a brief general introduction to CERN’s activities by Rolf Heuer, the Italian delegation visited LHC Point 1. After a tour of the ATLAS control room, they donned helmets to visit th...

  15. Information for contractors' staff

    CERN Multimedia

    The Dosimetry Service

    2005-01-01

    We have observed a significant decrease in the number of completed Certificates for Work in Controlled Radiation Areas being submitted with applications for dosimeters for your staff. Henceforth, we shall no longer be able to issue dosimeters without a certificate, which must be signed by the employee and the contractor's radiation-protection expert. You can obtain the certificate form from the Dosimetry Service at Building 24/E-011 or from our Website: http://service-rp-dosimetry.web.cern.ch/service-rp-dosimetry/. Thank you for your understanding. The Dosimetry Service

  16. International cooperation in accident analysis of RBMK reactors

    International Nuclear Information System (INIS)

    Kaliatka, A.; Isag

    2005-01-01

    safety programme reflected International Atomic Energy Agency safety recommendations. The Specific Objective of this project is to provide the Russian Authorities with a detailed code system able to reliably evaluate the core behavior (and all the associated safety outcomes) during severe transients and accidents, including extensive fuel melting, individual fuel channel rupture and then multiple channel ruptures. This code system should enable experts to evaluate the safety of core designs, and to give advice how to lessen-and mitigate- the consequences of core severe transients and accidents. The use of this code system shall lead to a safety improvement, which should be reflected in Russian and international safety review reports. The beneficiary in this project is the Russian Authorities 'ROSENERGOATOM' and 'GOSATOMNADZOR', the contractor - University of Pisa. The sub-contractor - Russian research institute, designer of RBMK - MINATOM/NIKIET. The key experts for this project are involved from different countries and institutions: LEI and Ignalina NPP (Lithuania), IAEA, PSU (USA), FZK (Germany), ITER (Italy) and other. The scope of the second project (PHARE projects) is to enhance the experience and capabilities and to establish a powerful infrastructure to Lithuanian State Nuclear Power Safety Inspectorate (VATESI) for following purposes: 1) Development of requirements for the Equipment Qualification Programme at Ignalina NPP, 2) Development of a regulatory guide on implementation of requirement for Ignalina NPP accident analysis, 3) Development of governing procedures for the operation of VATESI Emergency Centre accident analysis group, 4) Development of requirements on beyond design basis accident assessment and management of RBMK-1500 reactors, The beneficiary in this project was the Lithuanian State Nuclear Power Safety Inspectorate (VATESI) and its technical support organizations. The contractor was RISKAUDIT; which formed an EU project team with GRS, IRSN, SIP

  17. Prime alternative algebras that are nearly commutative

    International Nuclear Information System (INIS)

    Pchelintsev, S V

    2004-01-01

    We prove that by deforming the multiplication in a prime commutative alternative algebra using a C-operation we obtain a prime non-commutative alternative algebra. Under certain restrictions on non-commutative algebras this relation between algebras is reversible. Isotopes are special cases of deformations. We introduce and study a linear space generated by the Bruck C-operations. We prove that the Bruck space is generated by operations of rank 1 and 2 and that 'general' Bruck operations of rank 2 are independent in the following sense: a sum of n operations of rank 2 cannot be written as a linear combination of (n-1) operations of rank 2 and an arbitrary operation of rank 1. We describe infinite series of non-isomorphic prime non-commutative algebras of bounded degree that are deformations of a concrete prime commutative algebra

  18. Syntactic Variance and Priming Effects in Translation

    DEFF Research Database (Denmark)

    Bangalore, Srinivas; Behrens, Bergljot; Carl, Michael

    2016-01-01

    The present work investigates the relationship between syntactic variation and priming in translation. It is based on the claim that languages share a common cognitive network of neural activity. When the source and target languages are solicited in a translation context, this shared network can...... lead to facilitation effects, so-called priming effects. We suggest that priming is a default setting in translation, a special case of language use where source and target languages are constantly co-activated. Such priming effects are not restricted to lexical elements, but do also occur...... on the syntactic level. We tested these hypotheses with translation data from the TPR database, more specifically for three language pairs (English-German, English-Danish, and English-Spanish). Our results show that response times are shorter when syntactic structures are shared. The model explains this through...

  19. Research and development of austenitic stainless steels for fusion reactors, (1)

    International Nuclear Information System (INIS)

    1984-11-01

    In the alloy development for the first wall of blanket structure of the fusion experimental reactor and a subsequent reactor of Tokamak type, the prime candidate alloy (PCA) and reference steels were melted and examined on fundamental materials properties under a contract between JAERI and iron and steel companies, and under NRIM-JAERI collaborative work during the fiscal years of 1981 and 1982. All the alloys showed reasonable performance on mechanical properties, phase stability at elevated temperatures and weldability. The PCA has been proved to be used in controlled water-coolant environment. As to the welding of the PCA, welding rods suitable for TIG and covered arc welding have been selected from several candidate rods. (author)

  20. Crystalline Repository Project. Technical progress report, October 1982-March 1983

    International Nuclear Information System (INIS)

    1985-01-01

    This document reports the progress being made periodically on the development of a geologic repository in crystalline rock for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Crystalline Respository Development (OCRD), a prime contractor of the US Department of Energy Repository Project Office. The studies include work by other prime contractors and by subcontractors to OCRD