  1. Fast reactor operation in the United States

    International Nuclear Information System (INIS)

    Smith, R.R.; Cissel, D.W.

    1978-01-01

    Of the many American facilities dedicated to fast reactor technology, six qualify as liquid-metal-cooled fast reactors. All of these satisfy the following criteria: an unmoderated neutron spectrum, highly enriched fuel material, substantial heat production, and the use of a liquid metal coolant. These include the following: EBR-I Clementine, LAMPRE, EBR-II, EFFBR, and SEFOR. Collectively, these facilities encompassed all of the more important features of liquid-metal-cooled fast reactor technology. Coolant types ranged from mercury in Clementine, to NaK in EBR-I, and sodium in the others. Fuels included enriched-uranium metallic alloys in EBR-I, EBR-II, and EFFBR; metallic plutonium in Clementine; molten plutonium alloy in LAMPRE; and a mixed UO 2 -PuO 2 ceramic in SEFOR. Heat removal techniques ranged from air-blast cooling in LAMPRE and SEFOR; steam-electrical generation in EBR-I, EBR-II, and EFFBR; to a mercury-to-water heat dump in Clementine. Operational experience with such diverse systems has contributed heavily to the U.S. Each of the six systems is described from the viewpoints of purpose, history, design, and operation. Attempts are made to limit descriptive material to the most important features and to refer the reader to a few select references if additional information is needed

  2. Reactor operation

    CERN Document Server

    Shaw, J

    2013-01-01

    Reactor Operation covers the theoretical aspects and design information of nuclear reactors. This book is composed of nine chapters that also consider their control, calibration, and experimentation.The opening chapters present the general problems of reactor operation and the principles of reactor control and operation. The succeeding chapters deal with the instrumentation, start-up, pre-commissioning, and physical experiments of nuclear reactors. The remaining chapters are devoted to the control rod calibrations and temperature coefficient measurements in the reactor. These chapters also exp

  3. The chemical energy unit partial oxidation reactor operation simulation modeling

    Science.gov (United States)

    Mrakin, A. N.; Selivanov, A. A.; Batrakov, P. A.; Sotnikov, D. G.

    2018-01-01

    The chemical energy unit scheme for synthesis gas, electric and heat energy production which is possible to be used both for the chemical industry on-site facilities and under field conditions is represented in the paper. The partial oxidation reactor gasification process mathematical model is described and reaction products composition and temperature determining algorithm flow diagram is shown. The developed software product verification showed good convergence of the experimental values and calculations according to the other programmes: the temperature determining relative discrepancy amounted from 4 to 5 %, while the absolute composition discrepancy ranged from 1 to 3%. The synthesis gas composition was found out practically not to depend on the supplied into the partial oxidation reactor (POR) water vapour enthalpy and compressor air pressure increase ratio. Moreover, air consumption coefficient α increase from 0.7 to 0.9 was found out to decrease synthesis gas target components (carbon and hydrogen oxides) specific yield by nearly 2 times and synthesis gas target components required ratio was revealed to be seen in the water vapour specific consumption area (from 5 to 6 kg/kg of fuel).

  4. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    Energy Technology Data Exchange (ETDEWEB)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  5. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  6. Unit information system operational displays for VVER-1000 reactors

    International Nuclear Information System (INIS)

    Anikanov, S.S.; Carrera, J.P.; Gordon, P.

    1997-01-01

    The role of high level operational displays is explained as well as the principles of the design of such displays. The tasks of WWER operating personnel are described and the support provided by operational displays is highlighted. The architecture of the displays is also dealt with. (A.K.)

  7. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  8. Ageing Management of the reactor internals in Belgian nuclear units in view of Long Term Operation

    International Nuclear Information System (INIS)

    Gerard, R.; Bertolis, D.; Vissers, S.

    2012-01-01

    The reactor internals support the reactor core, distribute the coolant flow through the core, and guide and protect the rod control cluster assemblies and in-core instrumentation. Their integrity must be guaranteed in all operating and accident conditions. They are exposed to specific degradation mechanisms linked to the intense neutron irradiation, like Irradiation Assisted Stress Corrosion Cracking (IASCC) or potentially void swelling, in addition to more classical mechanisms like fatigue, wear and stress corrosion cracking. A rigorous follow-up of in-service degradation and an effective ageing management is therefore of crucial importance and contributes to the safe and economical operation of nuclear PWR units. (author)

  9. Pressurised water reactor operation

    International Nuclear Information System (INIS)

    Birnie, S.; Lamonby, J.K.

    1987-01-01

    The operation of a pressurized water reactor (PWR) is described with respect to the procedure for a unit start-up. The systems details and numerical data are for a four loop PWR station of the design proposed for Sizewell-'B', United Kingdom. A description is given of: the initial conditions, filling the reactor coolant system (RCS), heat-up and pressurisation of the RCS, secondary system preparations, reactor start-up, and reactivity control at power. (UK)

  10. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  11. Licensed operating reactors. Operating units status report, data as of 2-28-79

    International Nuclear Information System (INIS)

    1979-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices and IE Headquarters; and the third section is an appendix containing comparative statistics of U.S. nuclear/fossil capacity, identification of nuclear power plants within regional Electric Reliability Councils, the relative status of U.S. nuclear electric production to all U.S. electric production by state, and selected Edison Electric Institute operating statistics. Throughout the report, statistical factors for periods greater than a report month, or for more than one unit, are computed as the arithmetic average of each unit's individual operating statistics. The statistical factors for each unit for the report month are computed from actual power production for the month. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  12. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  13. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  14. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  16. Operating US power reactors

    International Nuclear Information System (INIS)

    Silver, E.G.

    1988-01-01

    This update, which appears regularly in each issue of Nuclear Safety, surveys the operations of those power reactors in the US which have been issued operating licenses. Table 1 shows the number of such reactors and their net capacities as of September 30, 1987, the end of the three-month period covered in this report. Table 2 lists the unit capacity and forced outage rate for each licensed reactor for each of the three months (July, August, and September 1987) covered in this report and the cumulative values of these parameters since the beginning of commercial operation. In addition to the tabular data, this article discusses other significant occurrences and developments that affected licensed US power reactors during this reporting period. Status changes at Braidwood Unit 1, Nine Mile Point 2, and Beaver Valley 2 are discussed. Other occurrences discussed are: retraining of control-room operators at Peach Bottom; a request for 25% power for Shoreham, problems at Fermi 2 which delayed the request to go to 75% power; the results of a safety study of the N Reactor at Hanford; a proposed merger of Pacific Gas and Electric with Sacramento Municipal Utility District which would result in the decommissioning of Rancho Seco; the ordered shutdown of Oyster Creek; a minor radioactivity release caused by a steam generator tube rupture at North Anna 1; and 13 fines levied by the NRC on reactor licensees

  17. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  18. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  19. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  20. Review of operational experience with the gas-cooled Magnox reactors of the United Kingdom Central Electricity Generating Board

    International Nuclear Information System (INIS)

    Cave, L.; Clarke, A.W.

    1984-01-01

    The paper provides a review, which is mainly of a statistical nature, of 260 reactor years of operating experience which the (United Kingdom) Central Electricity Generating Board (CEGB) has obtained with its gas-cooled, graphite moderated Magnox reactors. The main emphasis in the review is on safety rather than on availability. Data are provided on the overall incidence and frequencies of faults and it is shown that the plant items which are predominantly responsible for recorded faults are the gas circulators and the turbo-alternators. Analysis of the reactor trip experience shows that the incidence of events which necessitate an automatic shutdown of the reactor has been about one per reactor year and that of other events leading to a reactor trip has not been much higher (1.4 per reactor year). As would be expected from the length of the operating experience, some relatively rare events have occurred (expected frequency 10 -2 per reactor year, or less) but on each occasion the reactor shutdown system and decay heat removal systems functioned satisfactorily. No overheating of, or damage to, the fuel occurred as a result of these rare events or of other, more frequent, faults. Analysis of the trend of failure rates has shown an improvement with time in nearly all safety-related items and external inspection of the primary coolant circuits has shown no significant deterioration with time. However, some derating of the reactors has been necessary to reduce the effects of oxidation of mild steel in CO 2 , in order to obtain optimum service lives. In spite of major differences between the systems, a comparison of the failure rates of analogous systems and plant items in PWRs and the Magnox reactors show a considerable similarity. Overall, the review of CEGB's operational experience with its Magnos reactors has shown that the frequencies of faults in systems and plant items has been satisfyingly low. (author)

  1. Licensed operating reactors

    International Nuclear Information System (INIS)

    1991-08-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  2. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  3. Operational experience of decommissioning techniques for research reactors in the United Kingdom

    International Nuclear Information System (INIS)

    England, M.R.; McCool, T.M.

    2002-01-01

    In previous co-ordinated research projects (CRP) conducted by the IAEA no distinction was made between decommissioning activities carried out at nuclear power plants, research reactors or nuclear fuel cycle facilities. As experience was gained and technology advanced it became clear that decommissioning of research reactors had certain specific characteristics which needed a dedicated approach. It was within this context that a CRP on Decommissioning Techniques for Research Reactors was launched and conducted by the IAEA from 1997 to 2001. This paper considers the experience gained from the decommissioning of two research reactors during the course of the CRP namely: (a) the ICI Triga Mk I reactor at Billingham UK which was largely complete by the end of the research project and (b) the Argonaut 100 reactor at the Scottish Universities Research and Reactor centre at East Kilbride in Scotland which is currently is the early stages of dismantling/site operations. It is the intention of this paper with reference to the two case studies outlined above to compare the actual implementation of these works against the original proposals and identify areas that were found to be problematical and/or identify any lessons learnt. (author)

  4. Power reactors operational diagnosis

    International Nuclear Information System (INIS)

    Dach, K.; Pecinka, L.

    1976-01-01

    The definition of reactor operational diagnostics is presented and the fundamental trends of research are determined. The possible sources of power reactor malfunctions, the methods of defect detection, the data evaluation and the analysis of the results are discussed in detail. In view of scarcity of a theoretical basis and of insufficient in-core instrumentation, operational diagnostics cannot be as yet incorporated in a computer-aided reactor control system. (author)

  5. Nuclear reactor physics course for reactor operators

    International Nuclear Information System (INIS)

    Baeten, P.

    2006-01-01

    The education and training of nuclear reactor operators is important to guarantee the safe operation of present and future nuclear reactors. Therefore, a course on basic 'Nuclear reactor physics' in the initial and continuous training of reactor operators has proven to be indispensable. In most countries, such training also results from the direct request from the safety authorities to assure the high level of competence of the staff in nuclear reactors. The aim of the basic course on 'Nuclear Reactor Physics for reactor operators' is to provide the reactor operators with a basic understanding of the main concepts relevant to nuclear reactors. Seen the education level of the participants, mathematical derivations are simplified and reduced to a minimum, but not completely eliminated

  6. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    1980-09-01

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions [sr

  7. Reactor operation method

    International Nuclear Information System (INIS)

    Osumi, Katsumi; Miki, Minoru.

    1979-01-01

    Purpose: To prevent stress corrosion cracks by decreasing the dissolved oxygen and hydrogen peroxide concentrations in the coolants within a reactor container upon transient operation such as at the start-up or shutdown of bwr type reactors. Method: After a condensate has been evacuated, deaeration operation is conducted while opening a main steam drain line, as well as a main steam separation valve and a by-pass valve in a turbine by-pass line connecting the main steam line and the condenser without by way of a turbine, and the reactor is started-up by the extraction of control rods after the concentration of dissolved oxygen in the cooling water within a pressure vessel has been decreased below a predetermined value. Nuclear heating is started after the reactor water has been increased to about 150 0 C by pump heating after the end of the deaeration operation for preventing the concentration of hydrogen peroxide and oxygen in the reactor water from temporarily increasing immediately after the start-up. The corrosive atmosphere in the reactor vessel can thus be moderated. (Horiuchi, T.)

  8. Computer aided design of operational units for tritium recovery from Li17Pb83 blanket of a DEMO fusion reactor

    International Nuclear Information System (INIS)

    Malara, C.; Viola, A.

    1995-01-01

    The problem of tritium recovery from Li 17 Pb 83 blanket of a DEMO fusion reactor is analyzed with the objective of limiting tritium permeation into the cooling water to acceptable levels. To this aim, a mathematical model describing the tritium behavior in blanket/recovery unit circuit has been formulated. By solving the model equations, tritium permeation rate into the cooling water and tritium inventory in the blanket are evaluated as a function of dimensionless parameters describing the combined effects of overall resistance for tritium transfer from Li 17 Pb 83 alloy to cooling water, circulating rate of the molten alloy in blanket/recovery unit circuit and extraction efficiency of tritium recovery unit. The extraction efficiency is, in turn, evaluated as a function of the operating conditions of recovery unit. The design of tritium recovery unit is then optimized on the basis of the above parametric analysis and the results are herein reported and discussed for a tritium permeation limit of 10 g/day into the cooling water. 14 refs., 9 figs., 2 tabs

  9. Trend analysis of nuclear reactor automatic trip events subjected to operator's human error at United States nuclear power plants

    International Nuclear Information System (INIS)

    Takagawa, Kenichi

    2009-01-01

    Trends in nuclear reactor automatic trip events due to human errors during plant operating mode have been analyzed by extracting 20 events which took place in the United States during the period of seven years from 2002 to 2008, cited in the LERs (Licensee Event Reports) submitted to the US Nuclear Regulatory Commission (NRC). It was shown that the yearly number of events was relatively large before 2005, and thereafter the number decreased. A period of stable operation, in which the yearly number was kept very small, continued for about three years, and then the yearly number turned to increase again. Before 2005, automatic trip events occurred more frequently during periodic inspections or start-up/shut-down operations. The recent trends, however, indicate that trip events became more frequent due to human errors during daily operations. Human errors were mostly caused by the self-conceit and carelessness of operators through the whole period. The before mentioned trends in the yearly number of events might be explained as follows. The decrease in the automatic trip events is attributed to sharing trouble information, leading as a consequence to improvement of the manual and training for the operations which have a higher potential risk of automatic trip. Then, while the period of stable operation continued, some operators came to pay less attention to preventing human errors and not interest in the training, leading to automatic trip events in reality due to miss-operation. From these analyses on trouble experiences in the US, we learnt the followings to prevent the occurrence similar troubles in Japan: Operators should be thoroughly skilled in basic actions to prevent human errors as persons concerned. And it should be further emphasized that they should elaborate by imaging actual plant operations even though the simulator training gives them successful experiences. (author)

  10. Reactor operational transient analysis

    International Nuclear Information System (INIS)

    Shin, W.K.; Chae, S.K.; Han, K.I.; Yang, K.S.; Chung, H. D.; Kim, H.G.; Moon, H.J.; Ryu, Y.H.

    1983-01-01

    To build up efficient capability of safety review and inspection for the nuclear power plants, four area of studies have performed as follows: 1) In order to search the most optimized operating method during load follow operating schemes, automatic control and normal control, are compared each other under the CAOC condition. The analysis performed by DDID code has shown that the reactor has to be controlled by the operator manually during load follow operation. 2) Through the sensitivity analysis by COBRA code, the operating parameters, such as coolant pressure, flow rate, inlet temperature, and power distribution are shown to be important to the determination of DNBR. Expecially, inlet temperature of primary coolant system is appeared as the most senstive parameter on DNBR. 3) FRAPCON code is adapted to study the sensitivity of several operational parameters on the mechanical properties of reactor fuel rod. 4) The calculations procedure which is required to be obtained the neutron fluence at the reactor vessel and the spectrum at the surveillance capsule is established. The results of computation are conpared with those of FSAR and SWRI report and proved its applicability to reactor surveillance program. (Author)

  11. Method of reactor operation

    International Nuclear Information System (INIS)

    Maeda, Katsuji.

    1982-01-01

    Purpose: To prevent stress corrosion cracks in stainless steels caused from hydrogen peroxide in reactor operation in which the density of hydrogen peroxide in the reactor water is controlled upon reactor start-up. Method: A heat exchanger equipped with a heat source for applying external heat is disposed into the recycling system for reactor coolants. Upon reactor start-up, the coolants are heated by the heat exchanger till arriving at a temperature at which the dissolving rate is faster than the forming rate of hydrogen peroxide in the coolants, and nuclear heating is started after reaching the above temperature. The temperature of the reactor water is increased in such a manner and, when it arrives at 140 0 C, extraction of control elements is started and the heat source for the heat exchanger is interrupted simultaneously. In this way spikes in the density of hydrogen peroxide are suppressed upon reactor start-up to thereby decrease the stress corrosion cracks in stainless steels. (Horiuchi, T.)

  12. Operational power reactor health physics

    International Nuclear Information System (INIS)

    Watson, B.A.

    1987-01-01

    Operational Health Physics can be comprised of a multitude of organizations, both corporate and at the plant sites. The following discussion centers around Baltimore Gas and Electric's (BG and E) Calvert Cliffs Nuclear Power Plant, located in Lusby, Maryland. Calvert Cliffs is a twin Combustion Engineering 825 MWe pressurized water reactor site with Unit I having a General electric turbine-generator and Unit II having a Westinghouse turbine-generator. Having just completed each Unit's ten-year Inservice Inspection and Refueling Outge, a total of 20 reactor years operating health physics experience have been accumulated at Calvert Cliffs. Because BG and E has only one nuclear site most health physics functions are performed at the plant site. This is also true for the other BG and E nuclear related organizations, such as Engineering and Quality Assurance. Utilities with multiple plant sites have corporate health physics entity usually providing oversight to the various plant programs

  13. Small reactor operating mode

    International Nuclear Information System (INIS)

    Snell, V.G.

    1997-01-01

    There is a potential need for small reactors in the future for applications such as district heating, electricity production at remote sites, and desalination. Nuclear power can provide these at low cost and with insignificant pollution. The economies required by the small scale application, and/or the remote location, require a review of the size and location of the operating staff. Current concepts range all the way from reactors which are fully automatic, and need no local attention for days or weeks, to those with reduced local staff. In general the less dependent a reactor is on local human intervention, the greater its dependence on intrinsic safety features such as passive decay heat removal, low-stored energy and limited reactivity speed and depth in the control systems. A case study of the design and licensing of the SLOWPOKE Energy System heating reactor is presented. (author)

  14. Reactor operation monitor

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1982-01-01

    Purpose: To improve the working performance of a reactor by extending the range for the power conditioning due to the control rod operation and flow rate control. Constitution: The results of calculations for the power distribution and the burn-up degree distribution of the reactor core from a reactor performance computer that processes each of measuring signals in a nuclear power plant are used as the inputs for a computing device of the fuel rod power hysteresis to form the power hysteresis for each of the fuel rods up to the present time. The data are used as the inputs for the computing device of the fuel rod performance index, and the fuel rod performance index representing the critical values for the stresses in the fuel rod cladding tubes and the critical values for the duration of the stresses determined from the power hysteresis and the burn-up degree of the fuel rod are calculated for each of the fuel rods. Accordingly, the power conditioning can be carried out upon power-up in the reactor while monitoring the fuel rod performance index f(t) for each of the fuel assemblies, whereby the range for the power conditioning due to the control rod operation and the flow rate control can be extended relative to fuel assemblies in which f(t) is smaller than 1. (Yoshino, Y.)

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  16. TRIGA reactor operating experience

    International Nuclear Information System (INIS)

    Anderson, T.V.

    1970-01-01

    The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections

  17. Method of reactor operation

    International Nuclear Information System (INIS)

    Nakajima, Takeshi

    1988-01-01

    Purpose: To minimize the power change due to the increase in xenone and power distribution after reaching the rated power in the case of using fresh fuels no requiring conditioning operation thereby starting the nuclear reactor in a short period of time and stably. Method: When control rods are entirely inserted only with a purpose for the compensation of the reactivity in a xenon-unsaturated state such as upon starting of the nuclear reactor, peaking is generated in the lower portion of the reactor core. Therefore, it is necessary to insert control rods for additionally suppressing the peaking in the lower portion of the reactor core to a relatively shallow level. In view of the above, a plurality of control rods are divided into a first control rod group finally inserted in the rated power state and a second control rod group other than the above. Then, the power is once elevated to the rated power level by means of such an intermediate control rod pattern that the ratio of the total extraction amount between the first control rod group and the second control rod group is made constant. Then, the control rods are extracted stepwise while setting the ratio of the total extraction amount constant in accordance with the change of the accumulating amount of xenone, to thereby obtain the purpose. (kamimura, M.)

  18. RBMK power unit operational performance investigation while false coming into action of the emergency reactor cooling system

    International Nuclear Information System (INIS)

    Emel'yanov, I.Ya.; Aleksakov, A.N.; Vasilevskij, V.P.; Labazov, V.N.; Nikolaev, E.V.; Podlazov, L.N.; Rogov, V.D.; Shevchenko, V.V.

    1984-01-01

    Regimes of RBMK reactor operation during false coming into action of the emergency reactor cooling system (ERCS), which might occur in the case of faults in the automation systems or erroneous actions of operator have been investigated. At that, thepe exists a probability of water supply from ERCS to one half of the reactor, which results in a sharp change of boiling regime, and due to void reactivity effect it causes the neutron field disturbance. Change in flow rate and enthalpy of coolant, as well as changes of neutron flux in the left and right halves of the reactor at ERCS response and during operation of the whole system of automatic control of power and system of local automatic control of power - local emergency protection - have been studied. The investigations have been carried out for different values of vapour effect of void reactivity effect and for time ranges from 0 to 40 s. The calculations are made using a model, describing spatial dynamics of reactor in two-dimensional approximation with 54 nodes. The model describes neutron-physics and thermohydraulic processes and it is realized using the BEhSM-6 computer. It is pointed out that one system of automatic control of power or local emergency protection (i.e. without the shut-off system), is insufficient for the compensation of disturbances appearing as a result of false ERCS coming into operation

  19. Reactor operation method

    International Nuclear Information System (INIS)

    Suzuki, Toshio; Hida, Kazuki; Yoshioka, Ritsuo.

    1990-01-01

    The enrichment degree of fuels initially loaded in a reactor core was made extremely lower than that of fresh fuels to be loaded in the succeeding cycle, or the enrichment degree for all of the initially loaded fuels was made identical with that of the fresh fuels in the conventional reactor operation method. In this operation method, since the initially loaded fuels are sometimes taken out after the completion of the cycle at the low burnup degree as it is, it can not be said to reduce the fuel cycle cost. As a means for dissolving this problem, at least two different kinds of initially loaded fuels are prepared. The enrichment degree of the highly enriched fuels is made identical with that of the fresh fuels, and the enrichment degree and the number of low enriched fuels are not changed after the completion of the first cycle but they are operated till the end of the second cycle. Further, all of the fuels at the low enrichment degree are taken out after the completion of the second cycle and exchanged with the fresh fuels. As a result, high burnup ratio of the initially loaded fuels can be increased, to improve the fuel economy. (I.S.)

  20. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  2. Reactor operation safety information document

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  3. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Haselow, J.S.; Price, V.; Stephenson, D.E.; Bledsoe, H.W.; Looney, B.B.

    1989-12-01

    The Savannah River Site (SRS) produces nuclear materials, primarily plutonium and tritium, to meet the requirements of the Department of Defense. These products have been formed in nuclear reactors that were built during 1950--1955 at the SRS. K, L, and P reactors are three of five reactors that have been used in the past to produce the nuclear materials. All three of these reactors discontinued operation in 1988. Currently, intense efforts are being extended to prepare these three reactors for restart in a manner that protects human health and the environment. To document that restarting the reactors will have minimal impacts to human health and the environment, a three-volume Reactor Operations Environmental Impact Document has been prepared. The document focuses on the impacts of restarting the K, L, and P reactors on both the SRS and surrounding areas. This volume discusses the geology, seismology, and subsurface hydrology. 195 refs., 101 figs., 16 tabs.

  4. Method of operating a reactor

    International Nuclear Information System (INIS)

    Oosumi, Katsumi; Yamamoto, Michiyoshi.

    1980-01-01

    Purpose: To prevent stress corrosion cracking in the structural material of a reactor pressure vessel. Method: Prior to the starting of a reactor, the reactor pressure vessel is evacuated to carry out degassing of reactor water, and, at the same time, reactor water is heated. After reactor water is heated to a predetermined temperature, control rods are extracted to start nuclear heating. While the temperature of the reactor water is in a temperature range where elution of a metal which is a structural material of the reactor pressure vessel becomes vigorous and the sensitivity to the stress corrosion cracks increases, the reactor is operated at the maximum permissible temperature raising speed or maximum permissible cooling speed. (Aizawa, K.)

  5. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  6. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  7. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  8. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  9. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  10. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  12. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  13. Monitoring device for reactor operation

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1980-01-01

    Purpose: To increase the freedom for the power control due to control rod operation and flow rate control, as well as prevent fuel failures by the provision of a power distribution forecasting device for forecasting the changes in the reactor core power distribution and a device for calculating the fuel performance index and judging to display the calculated values. Constitution: The results for the calculation of the reactor core power distribution from a process computer that processes each of measuring signals of a nuclear power plant are used as inputs to a fuel power history calculator to constitute the power history up to the present time for each of the fuels. The date are inputted to a fuel performance index calculator to calculate the fuel performance index at present time for each of the fuels. Changes in the power distribution are forecast in a forecasting device for reactor power distribution relative to the changes in the control variables of a control variable memory unit and the date are inputted to a fuel power history calculator to forecast the power changes for each of the fuels. The amount of the power changes is inputted to a fuel performance index calculator and a fuel performance indicating and judging device judges and displays if they exceed a predetermined value. (Seki, T.)

  14. Reactor technology: power conversion systems and reactor operation and maintenance

    International Nuclear Information System (INIS)

    Powell, J.R.

    1977-01-01

    The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He 3 reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored

  15. Reactor core operation management system

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Tomomi.

    1992-05-28

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.).

  16. Reactor core operation management system

    International Nuclear Information System (INIS)

    Sato, Tomomi.

    1992-01-01

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.)

  17. Scientists, engineers and technicians in nuclear reactor operation and maintenance. Fifteen years of growth and change in the United States of America

    International Nuclear Information System (INIS)

    Chewning, J.S.

    1980-01-01

    Between 1962 and 1977 the number of nuclear reactors in the United States of America increased from 4 to 65, and the total capacity increased from 730 to 47013 MW. Employment in the reactor operation and maintenance sector, which increased correspondingly from 633 to 17270, showed the earmarks of a maturing industry. By the end of that 15-year span, fewer workers were involved in research and development activities, and the proportion of scientists and engineers had decreased as the duties and responsibilities became more standardized and routine and could be taken over by highly trained technicians. There were also subtle changes in the discipline mixes. Nuclear and reactor engineers took their place in the labour force in increasing numbers as nuclear engineering was recognized as a distinct occupation, and there was a corresponding decrease in the proportion of more traditional engineering disciplines. Life science disciplines increased as concern grew for the health and safety of nuclear workers and the general public, and the physical science disciplines decreased in importance as proportionally less research and development was carried out in reactor operation and maintenance. A profile of nuclear power plant personnel drawn from refined data shows that the industry has truly 'come of age.' By far the largest group of workers is made up of technicians, with the second largest group made up of skilled craftworkers. Less than 30% of all workers in nuclear power operation and maintenance in 1977 were in professional occupations. (author)

  18. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Specht, W.L.; Mackey, H.E.; Paller, M.H.; Wilde, E.W.; Dicks, A.S.

    1989-12-01

    The Savannah River Site (SRS) is a large United States Department of Energy installation on the upper Atlantic Coastal Plain of South Carolina. The SRS contains diverse habitats, flora, and fauna. Habitats include upland terrestrial areas, varied wetlands including Carolina Bays, the Savannah River swamp system, and impoundment related and riparian wetlands, and the aquatic habitats of several stream systems, two large cooling reservoirs, and the Savannah River. These diverse habitats support a large variety of plants and animals including many commercially or recreational valuable species and several rare, threatened or endangered species. This volume describes the major habitats and their biota found on the SRS, and discuss the impacts of continued operation of the K, L, and P production reactors.

  19. Tendencies in operating power reactors

    International Nuclear Information System (INIS)

    Brinckmann, H.F.

    1987-01-01

    A survey is given about new tendencies in operating power reactors. In order to meet the high demands for control and monitoring of power reactors modern procedures are applicated such as the incore-neutron flux detection by means of electron emission detectors and multi-component activation probes, the noise diagnostics as well as high-efficient automation systems

  20. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  1. RA reactor operation and maintenance

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-02-01

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air

  2. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, L.R.; Hayes, D.W.; Hunter, C.H.; Marter, W.L.; Moyer, R.A.

    1989-12-01

    This volume is a reactor operation environmental information document for the Savannah River Plant. Topics include meteorology, surface hydrology, transport, environmental impacts, and radiation effects. 48 figs., 56 tabs. (KD)

  3. Reactor operations at SAFARI-1

    International Nuclear Information System (INIS)

    Vlok, J.W.H.

    2003-01-01

    A vigorous commercial programme of isotope production and other radiation services has been followed by the SAFARI-1 research reactor over the past ten years - superimposed on the original purpose of the reactor to provide a basic tool for nuclear research, development and education to the country at an institutional level. A combination of the binding nature of the resulting contractual obligations and tighter regulatory control has demanded an equally vigorous programme of upgrading, replacement and renovation of many systems in order to improve the safety and reliability of the reactor. Not least among these changes is the more effective training and deployment of operations personnel that has been necessitated as the operational demands on the reactor evolved from five days per week to twenty four hours per day, seven days per week, with more than 300 days per year at full power. This paper briefly sketches the operational history of SAFARI-1 and then focuses on the training and structuring currently in place to meet the operational needs. There is a detailed step-by-step look at the operator?s career plan and pre-defined milestones. Shift work, especially the shift cycle, has a negative influence on the operator's career path development, especially due to his unavailability for training. Methods utilised to minimise this influence are presented. The increase of responsibilities regarding the operation of the reactor, ancillaries and experimental facilities as the operator progresses with his career are discussed. (author)

  4. Reactor operation feed-back in France

    International Nuclear Information System (INIS)

    Feltin, C.; Fourest, B.; Libmann, J.

    1982-09-01

    The Nuclear Safety Department (DSN), technical support of French Safety Authorities, is, in particular, in charge of the analysis of reactor operation and of measures taken consequently to incidents. It proposed the criteria used to select significant incidents; it analyzes such incidents. DSN also analyzes the operating experience of each plant, several years after starting. It examines foreign incidents to assess in what extent lessons learned can be applied to french reactors. The examples presented show that to improve the safety of units operation, the experience feed-back leads to make arrangements, or modifications concerning not only circuits or materials but often procedures. Moreover they show the importance of procedures concerning the operations carried out during reactor shutdown

  5. Method for operating nuclear reactor

    International Nuclear Information System (INIS)

    Utamura, Motoaki; Urata, Megumu; Uchida, Shunsuke

    1978-01-01

    Purpose: In order to judge the fuel failures, if any, without opening a reactor container for BWR type reactors, a method has been described for measuring the difference between the temperature dependent iodine spike value and the pressure dependent iodine spike value in the pressure vessel. Method: After the scram of a nuclear reactor, steam generated by decay heat is condensed in a remaining heat exchanger and cooling water is returned through a recycling pipe line to a reactor core. At the same time, a control rod drive system pump is operated, the reactor core is filled with the cooling water. Then, the coolant is taken from the recycling pipe line to cool the reactor core. After applying the temperature fluctuation, the cooling water is sampled at a predetermined time interval at a sampling point to determine the changes with time in the radioactive concentration of iodine. When the radioactivity of iodine in the cooling water is lowered sufficiently by a reactor purifying system, the nuclear reactor vessel is depressurized. After applying pressure fluctuation, iodine spike value is determined. (Kawakami, Y.)

  6. Operable Unit Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset consists of operable unit data from multiple Superfund sites in U.S. EPA Region 8. These data were acquired from multiple sources at different times and...

  7. The qualification of reactor operators

    International Nuclear Information System (INIS)

    Lima, J.M. de; Soares, H.V.

    1981-01-01

    The qualification and performance of nuclear power personnel have an important influence on the availability and safety operation of these plants. This paper describes the Brazilian rules and norms established by the CNEN-Brazilian Atomic Energy Comission, as well as policy of other countries concerning training requirements and experiences of nuclear power reactor operators. Some coments are made about the im pact of the march 1979 Three Mile Island accident on upgrading the reactor training requirements in U.S.A. and its international implication. (Author) [pt

  8. Research nuclear reactor operation management

    International Nuclear Information System (INIS)

    Preda, M.; Carabulea, A.

    2008-01-01

    Some aspects of reactor operation management are highlighted. The main mission of the operational staff at a testing reactor is to operate it safely and efficiently, to ensure proper conditions for different research programs implying the use of the reactor. For reaching this aim, there were settled down operating plans for every objective, and procedure and working instructions for staff training were established, both for the start-up and for the safe operation of the reactor. Damages during operation or special situations which can arise, at stop, start-up, maintenance procedures were thoroughly considered. While the technical skill is considered to be the most important quality of the staff, the organising capacity is a must in the operation of any nuclear facility. Staff training aims at gaining both theoretical and practical experience based on standards about staff quality at each work level. 'Plow' sheet has to be carefully done, setting clear the decision responsibility for each person so that everyone's own technical level to be coupled to the problems which implies his responsibility. Possible events which may arise in operation, e.g., criticality, irradiation, contamination, and which do not arise in other fields, have to be carefully studied. One stresses that the management based on technical and scientific arguments have to cover through technical, economical and nuclear safety requirements a series of interlinked subprograms. Every such subprograms is subject to some peculiar demands by the help of which the entire activity field is coordinated. Hence for any subprogram there are established the objectives to be achieved, the applicable regulations, well-defined responsibilities, training of the personnel involved, the material and documentation basis required and activity planning. The following up of positive or negative responses generated by experiments and the information synthesis close the management scope. Important management aspects

  9. United States Domestic Research Reactor Infrastructure - TRIGA Reactor Fuel Support

    International Nuclear Information System (INIS)

    Morrell, Douglas

    2008-01-01

    The purpose of the United State Domestic Research Reactor Infrastructure Program is to provide fresh nuclear reactor fuel to United States universities at no, or low, cost to the university. The title of the fuel remains with the United States government and when universities are finished with the fuel, the fuel is returned to the United States government. The program is funded by the United States Department of Energy - Nuclear Energy division, managed by Department of Energy - Idaho Field Office, and contracted to the Idaho National Laboratory's Management and Operations Contractor - Battelle Energy Alliance. Program has been at Idaho since 1977 and INL subcontracts with 26 United States domestic reactor facilities (13 TRIGA facilities, 9 plate fuel facilities, 2 AGN facilities, 1 Pulstar fuel facility, 1 Critical facility). University has not shipped fuel since 1968 and as such, we have no present procedures for shipping spent fuel. In addition: floor loading rate is unknown, many interferences must be removed to allow direct access to the reactor tank, floor space in the reactor cell is very limited, pavement ends inside our fence; some of the surface is not finished. The whole approach is narrow, curving and downhill. A truck large enough to transport the cask cannot pull into the lot and then back out (nearly impossible / refused by drivers); a large capacity (100 ton), long boom crane would have to be used due to loading dock obstructions. Access to the entrance door is on a sidewalk. The campus uses it as a road for construction equipment, deliveries and security response. Large trees are on both sides of sidewalk. Spent fuel shipments have never been done, no procedures approved or in place, no approved casks, no accident or safety analysis for spent fuel loading. Any cask assembly used in this facility will have to be removed from one crane, moved on the floor and then attached to another crane to get from the staging area to the reactor room. Reactor

  10. Reactor Operations informal monthly report December 1994

    International Nuclear Information System (INIS)

    1994-12-01

    Reactor operations at the MRR and HFBR reactors at Brookhaven National Laboratory are presented for December 1994. Reactor run-time and power levels, instrumentation, mechanical maintenance, occurrence reports, and safety information are included

  11. A Compilation of Boiling Water Reactor Operational Experience for the United Kingdom's Office for Nuclear Regulation's Advanced Boiling Water Reactor Generic Design Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, Timothy A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Liao, Huafei [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-12-01

    United States nuclear power plant Licensee Event Reports (LERs), submitted to the United States Nuclear Regulatory Commission (NRC) under law as required by 10 CFR 50.72 and 50.73 were evaluated for reliance to the United Kingdom’s Health and Safety Executive – Office for Nuclear Regulation’s (ONR) general design assessment of the Advanced Boiling Water Reactor (ABWR) design. An NRC compendium of LERs, compiled by Idaho National Laboratory over the time period January 1, 2000 through March 31, 2014, were sorted by BWR safety system and sorted into two categories: those events leading to a SCRAM, and those events which constituted a safety system failure. The LERs were then evaluated as to the relevance of the operational experience to the ABWR design.

  12. Reactor operator screening test experiences

    International Nuclear Information System (INIS)

    O'Brien, W.J.; Penkala, J.L.; Witzig, W.F.

    1976-01-01

    When it became apparent to Duquesne Light Company of Pittsburgh, Pennsylvania, that the throughput of their candidate selection-Phase I training-reactor operator certification sequence was something short of acceptable, the utility decided to ask consultants to make recommendations with respect to candidate selection procedures. The recommendation implemented was to create a Nuclear Training Test that would predict the success of a candidate in completing Phase I training and subsequently qualify for reactor operator certification. The mechanics involved in developing and calibrating the Nuclear Training Test are described. An arbitration decision that resulted when a number of International Brotherhood of Electrical Workers union employees filed a grievance alleging that the selection examination was unfair, invalid, not job related, inappropriate, and discriminatorily evaluated is also discussed. The arbitration decision favored the use of the Nuclear Training Test

  13. To report the obtained results in the simulation with the FCS-11 and Presto codes of the two first operation cycles of the Laguna Verde Unit 1 reactor

    International Nuclear Information System (INIS)

    Montes T, J.L.; Moran L, J.M.; Cortes C, C.C.

    1990-08-01

    The objective of this work is to establish a preliminary methodology to carry out analysis of recharges for the reactor of the Laguna Verde U-1, by means of the evaluation of the state of the reactor core in its first two operation cycles using the FCS2 and Presto-B codes. (Author)

  14. Health requirements for nuclear reactor operators

    International Nuclear Information System (INIS)

    1980-05-01

    The health prerequisites established for the qualification of nuclear reactor operators according to CNEN-NE-1.01 Guidelines Licensing of nuclear reactor operators, CNEN-12/79 Resolution, are described. (M.A.) [pt

  15. United Kingdom and USSR reactor types

    International Nuclear Information System (INIS)

    Lewins, Jeffery

    1988-01-01

    The features of the RBMK reactor operated at Chernobyl are compared with reactor types pertinent to the UK. The UK reactors covered are in three classes: the commercial reactors now built and operated or in commission (Magnox and Advanced Gas-cooled Reactor (AGR)); the prototype Steam Generating Heavy Water Reactor (SGHWR) and Prototype Fast Reactor (PFR) that have comparable performance to commercial reactors; and the proposed Pressurised Water Reactor (PWR) or Sizewell 'B' design which, it will be recollected, is different in detail from PWRs built elsewhere. We do not include research and test reactors nor the Royal Navy PWRs. The appendices explain resonances, Doppler and Xenon effects, the reactor physics of Chernobyl and positive void coefficients all of which are relevant to the comparisons. (author)

  16. Method of safely operating nuclear reactor

    International Nuclear Information System (INIS)

    Ochiai, Kanehiro.

    1976-01-01

    Purpose: To provide a method of safely operating an nuclear reactor, comprising supporting a load applied to a reactor container partly with secondary container facilities thereby reducing the load borne by the reactor container when water is injected into the core to submerge the core in an emergency. Method: In a reactor emergency, water is injected into the reactor core thereby to submerge the core. Further, water is injected into a gap between the reactor container and the secondary container facilities. By the injection of water into the gap between the reactor container and the secondary container facilities a large apparent mass is applied to the reactor container, as a result of which the reactor container undergoes the same vibration as that of the secondary container facilities. Therefore, the load borne by the reactor container itself is reduced and stress at the bottom part of the reactor container is released. This permits the reactor to be operated more safely. (Moriyama, K.)

  17. Reactor modification, preparation and operation

    International Nuclear Information System (INIS)

    Weill, J.; Furet, J.; Baillet, J.; Donvez, G.; Duchene, J.; Gras, R.; Mercier, R.; Chenouard, J.; Leconte, J.

    1962-01-01

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system

  18. Reactor modification, preparation and operation

    Energy Technology Data Exchange (ETDEWEB)

    Weill, J; Furet, J; Baillet, J; Donvez, G; Duchene, J; Gras, R; Mercier, R [Electronics Dept., Independent Section of Reactor Electronics, Saclay (France); Chenouard, J; Leconte, J [Dept. of Physical Chemistry, Stable Isotopes Section, Saclay (France)

    1962-03-15

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system.

  19. Reactor modification, preparation and operation

    Energy Technology Data Exchange (ETDEWEB)

    Weill, J; Furet, J; Baillet, J; Donvez, G; Duchene, J; Gras, R; Mercier, R [Electronics Dept., Independent Section of Reactor Electronics, Saclay (France); Chenouard, J; Leconte, J [Dept. of Physical Chemistry, Stable Isotopes Section, Saclay (France)

    1962-03-01

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system.

  20. Digital computer operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Colley, R.W.

    1984-01-01

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state

  1. Investigation reactor D-2201 polypropylene production unit using nuclear technique

    International Nuclear Information System (INIS)

    Wibisono; Sugiharto; Jefri Simanjuntak

    2016-01-01

    D-2201 reactor is a unit in the polypropylene production process at Pertamina Refinery Unit III Plaju. Reactor with a capacity of 45 kilo liter is not operated in normal operation condition. The validity of liquid level indicator on the unit is doubtful when refers to the production quality. Gamma source of 150 mCi Cobalt-60 and a scintillation detector had been used to scan the outer wall of the reactor to detect the liquid level during operation with a capacity of 40 %. Measurements were made along the reactor walls with 25 mm scan resolution and 5 seconds time sampling. Experiment result shows that the liquid level at the position of 40 % and at normal level position are not observed. Investigation did not find the liquid level above normal. D-2201 is diagnose not normal operating condition diagnosed with liquid abundant passed the recommended limits. Investigation advised to repair or to calibrate the liquid level indicator which is currently installed. (author)

  2. A large economic liquid metal reactor for United States utilities

    International Nuclear Information System (INIS)

    Rodwell, E.

    1985-01-01

    The United States has demonstrated its ability to build and operate small and medium sized liquid metal reactors and continues to operate the Experimental Breeder Reactor II and the Fast Flux Test Facility to demonstrate long life fuel designs. Similar-sized liquid metal reactors in Europe have been followed by a step-up to the 1200 MWe capacity of the Superphenix plant. To permit the United States to make a similar step-up in capacity, a 1320 MWe liquid metal reactor plant has been designed with the main emphasis on minimizing the specific capital cost in order to be competitive with light water reactor plant and fossil plant alternatives. The design is based on a four parallel heat transport loops arrangement and complies with current regulatory requirements. The primary heat transport loops are now being integrated into the reactor vessel to achieve further reduction in the capital cost

  3. On the slimeless water operation in the RBMK type reactors

    International Nuclear Information System (INIS)

    Margulova, T.Kh.; Mamet, V.A.; Nikitina, I.S.; Karakhanyan, L.N.

    1988-01-01

    Water chemistry conditions of the operating RBMK-1000 and RBMK-1500 units are analysed. Inevitability of iron oxide deposits in RBMK-1000 and particularly in RBMK-1500 reactors is demonstrated. Organization of a new slimeless correcting water chemistry for RBMK-1000 and RBMK-1500 reactors is recommended

  4. BN-1200 Reactor Power Unit Design Development

    International Nuclear Information System (INIS)

    Vasilyev, B.A.; Shepelev, S.F.; Ashirmetov, M.R.; Poplavsky, V.M.

    2013-01-01

    Main goals of BN-1200 design: • Develop a reliable new generation reactor plant for the commercial power unit with fast reactor to implement the first-priority objectives in changing over to closed nuclear fuel cycle; • Improve technical and economic indices of BN reactor power unit to the level of those of Russian VVER of equal power; • Enhance the safety up to the level of the requirements for the 4th generation RP

  5. Reactor science and technology: operation and control of reactors

    International Nuclear Information System (INIS)

    Qiu Junlong

    1994-01-01

    This article is a collection of short reports on reactor operation and research in China in 1991. The operation of and research activities linked with the Heavy Water Research Reactor, Swimming Pool Reactor and Miniature Neutron Source Reactor are briefly surveyed. A number of papers then follow on the developing strategies in Chinese fast breeder reactor technology including the conceptual design of an experimental fast reactor (FFR), theoretical studies of FFR thermo-hydraulics and a design for an immersed sodium flowmeter. Reactor physics studies cover a range of topics including several related to work on zero power reactors. The section on reactor safety analysis is concerned largely with the assessment of established, and the presentation of new, computer codes for use in PWR safety calculations. Experimental and theoretical studies of fuels and reactor materials for FBRs, PWRs, BWRs and fusion reactors are described. A final miscellaneous section covers Mo-Tc isotope production in the swimming pool reactor, convective heat transfer in tubes and diffusion of tritium through plastic/aluminium composite films and Li 2 SiO 3 . (UK)

  6. Recent U.S. reactor operating experience

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1977-01-01

    A qualitative assessment of U.S. and foreign reactor operating experience is provided. Recent operating occurrences having potentially significant safety impacts on power operation are described. An evaluation of the seriousness of each of these issues and the plans for resolution is discussed. A quantitative report on U.S. reactor operational experience is included. The details of the NRC program for evaluating and applying operating reactor experience in the regulatory process is discussed. A review is made of the adequacy of operating reactor safety and environmental margins based on actual operating experience. The Regulatory response philosophy to operating reactor experiences is detailed. This discussion indicates the NRC emphasis on the importance of a balanced action plan to provide for the protection of public safety in the national interest

  7. Standards for safe operation of research reactors

    International Nuclear Information System (INIS)

    1996-01-01

    The safety of research reactors is based on many factors such as suitable choice of location, design and construction according to the international standards, it also depends on well trained and qualified operational staff. These standards determine the responsibilities of all who are concerned with the research reactors safe operation, and who are responsible of all related activities in all the administrative and technical stages in a way that insures the safe operation of the reactor

  8. From USA operation experience of industrial uranium-graphite reactors

    International Nuclear Information System (INIS)

    Burdakov, N.S.

    1996-01-01

    The review on materials, presented by a group of the USA specialists at the seminar in Moscow on October 9-11, 1995 is considered. The above specialists shared their experience in operation of the Hanford industrial reactors, aimed at plutonium production for atomic bombs. The purpose of the above visit consisted in providing assistance to the Russian specialists by evaluation and modernization of operational conditions safety improvement of the RBMK type reactors. Special attention is paid to the behaviour of the graphite lining and channel tubes with an account of possible channel power interaction with the reactor structural units. The information on the experience of the Hanford reactor operation may be useful for specialists, operating the RBMK type reactors

  9. Nuclear reactor unit shutdown planning

    International Nuclear Information System (INIS)

    Gardais, J.P.

    1994-01-01

    In order to optimize the reactor maintenance shutdown efficiency and the reactor availability, an audit had been performed on the shutdown organization at EDF: management, skills, methods and experience feedback have been evaluated; several improvement paths have been identified: project management, introduction of shutdown management professionals, shutdown permanent industrialization, and experience feedback engineering

  10. Computer monitoring of the RB reactor operation

    International Nuclear Information System (INIS)

    Milovanovic, S.; Pesic, M.; Milovanovic, T.

    1998-01-01

    Personal computer based acquisition system designed for monitoring of operation of the RB experimental reactor in the Institute of Nuclear Sciences 'Vinca' (former 'Boris Kidric') and experiences acquired during its use are shown in this paper. The monitoring covers generally all nuclear aspects of the reactor operation (start-up, nominal power operation, power changing, shut down and maintenance), but the emphasis is put on: real time (especially fast changing) reactivity measurement; supervising time dependence of the safety rods positions during shut down, and detection of position inaccuracy or failure operation of safety/control rods during the reactor operation or maintenance. (author)

  11. Fast-reactor fuel reprocessing in the United Kingdom

    International Nuclear Information System (INIS)

    Allardice, R.H.; Buck, C.; Williams, J.

    1977-01-01

    Enriched uranium metal fuel irradiated in the Dounreay Fast Reactor has been reprocessed and refabricated in plants specifically designed for the purpose in the United Kingdom since 1961. Efficient and reliable fuel recycle is essential to the development of a plutonium-based fast-reactor system, and the importance of establishing at an early stage fast-reactor fuel reprocessing has been reinforced by current world difficulties in reprocessing high-burnup thermal-reactor oxide fuel. The United Kingdom therefore decided to reprocess irradiated fuel from the 250MW(e) Prototype Fast Reactor (PFR) as an integral part of the fast reactor development programme. Flowsheet and equipment development work for the small-scale fully active demonstration plant has been carried out since 1972, and the plant will be commissioned and ready for active operation during 1977. In parallel, a comprehensive waste-management system has been developed and installed. Based on this development work and the information which will arise from active operation of the plant, a parallel development programme has been initiated to provide the basis for the design of a large-scale fast-reactor fuel-reprocessing plant to come into operation in the late 1980s to support the projected UK fast-reactor installation programme. The paper identifies the important differences between fast-reactor and thermal-reactor fuel-reprocessing technologies and describes some of the development work carried out in these areas for the small-scale PFR fuel-reprocessing operation. In addition, the development programme in aid of the design of a larger scale fast-reactor fuel-reprocessing plant is outlined and the current design philosophy discussed. (author)

  12. Operation and utilization of Indonesia Research Reactors

    International Nuclear Information System (INIS)

    Kuntoro, Iman; Sujalmo, Saiful; Tarigan, Alim

    2004-01-01

    For supporting the R and D in nuclear science and technology and its application, BATAN own and operate three research reactors namely, TRIGA-2000, KARTINI and RSG-GAS having thermal power of 2 MW, 100 kW and 30 MW respectively. The main features, operation and utilization progress of the reactors are described in this report. (author)

  13. Safety of research reactors (Design and Operation)

    International Nuclear Information System (INIS)

    Dirar, H. M.

    2012-06-01

    The primary objective of this thesis is to conduct a comprehensive up-to-date literature review on the current status of safety of research reactor both in design and operation providing the future trends in safety of research reactors. Data and technical information of variety selected historical research reactors were thoroughly reviewed and evaluated, furthermore illustrations of the material of fuel, control rods, shielding, moderators and coolants used were discussed. Insight study of some historical research reactors was carried with considering sample cases such as Chicago Pile-1, F-1 reactor, Chalk River Laboratories,. The National Research Experimental Reactor and others. The current status of research reactors and their geographical distribution, reactor category and utilization is also covered. Examples of some recent advanced reactors were studied like safety barriers of HANARO of Korea including safety doors of the hall and building entrance and finger print identification which prevent the reactor from sabotage. On the basis of the results of this research, it is apparent that a high quality of safety of nuclear reactors can be attained by achieving enough robust construction, designing components of high levels of efficiency, replacing the compounds of the reactor in order to avoid corrosion and degradation with age, coupled with experienced scientists and technical staffs to operate nuclear research facilities.(Author)

  14. PUSPATI Triga Reactor - First year in operation

    International Nuclear Information System (INIS)

    Nahrul Khair Rashid.

    1983-01-01

    First year operation of RTP reactor was mostly devoted to making in house training, setting up and testing the facilities in preparation for more routine operations. Generally the operations are categorized into 4 main purposes; experiment of research, teaching and training, demonstration, and testing and maintenance. These four purposes are elaborated in detail. Additions and modifications were performed in order to improve the safety of reactor operation. (A.J.)

  15. United States Domestic Research Reactor Infrastructure TRIGA Reactor Fuel Support

    International Nuclear Information System (INIS)

    Morrell, Douglas

    2011-01-01

    The United State Domestic Research Reactor Infrastructure Program at the Idaho National Laboratory manages and provides project management, technical, quality engineering, quality inspection and nuclear material support for the United States Department of Energy sponsored University Reactor Fuels Program. This program provides fresh, unirradiated nuclear fuel to Domestic University Research Reactor Facilities and is responsible for the return of the DOE-owned, irradiated nuclear fuel over the life of the program. This presentation will introduce the program management team, the universities supported by the program, the status of the program and focus on the return process of irradiated nuclear fuel for long term storage at DOE managed receipt facilities. It will include lessons learned from research reactor facilities that have successfully shipped spent fuel elements to DOE receipt facilities.

  16. Artificial intelligence in nuclear reactor operation

    International Nuclear Information System (INIS)

    Da Ruan; Benitez-Read, J.S.

    2005-01-01

    Assessment of four real fuzzy control applications at the MIT research reactor in the US, the FUGEN heavy water reactor in Japan, the BR1 research reactor in Belgium, and a TRIGA Mark III reactor in Mexico will be examined through a SWOT analysis (strengths, weakness, opportunities, and threats). Special attention will be paid to the current cooperation between the Belgian Nuclear Research Centre (SCK·CEN) and the Mexican Nuclear Centre (ININ) on AI-based intelligent control for nuclear reactor operation under the partial support of the National Council for Science and Technology of Mexico (CONACYT). (authors)

  17. Hybrid Reactor designs in the United States

    International Nuclear Information System (INIS)

    Wolkenhauer, W.C.

    1978-01-01

    This paper reviews the current, active, interrelated Hybrid Reactor development programs in the United States, and offers a probable future course of action for the technology. The Department of Energy (DOE) program primarily emphasizes development of Hybrid Reactors that are optimized for proliferation resistance. The Electric Power Research Institute (EPRI) program concentrates on avenues for Hybrid Reactor commercialization. The history of electrical generation technology has been one of steady movement toward higher power densities and higher quality fuels. An apparent advantage of the Hybrid Reactor option is that it follows this trend

  18. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  19. Method of operating a nuclear reactor

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Schaefer, W.F.

    1978-01-01

    A method of controlling a nuclear power generting station in the event of a malfunction of particular operating components is described. Upon identification of a malfunction, preselected groups of control rods are fully inserted sequentially until a predetermined power level is approached. Additional control rods are then selectively inserted to quickly bring the reactor to a second given power level to be compatible with safe operation of the system with the malfunctioning component. At the time the thermal power output of the reactor is being reduced, the turbine is operated at a rate consistent with the output of the reactor. In the event of a malfunction, the power generating system is operated in a turbine following reactor mode, with the reactor power rapidly reduced, in a controlled manner, to a safe level compatible with the type of malfunction experienced

  20. Operational experience of the Marcoule reactors

    International Nuclear Information System (INIS)

    Conte, F.

    1963-01-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [fr

  1. Manual for the operation of research reactors

    International Nuclear Information System (INIS)

    1965-01-01

    The great majority of the research reactors in newly established centres are light-water cooled and are often also light-water moderated. Consequently, the IAEA has decided to publish in its Technical Reports Series a manual dealing with the technical and practical problems associated with the safe and efficient operation of this type of reactor. Even though this manual is limited to light-water reactors in its direct application and presents the practices and experience at one specific reactor centre, it may also be useful for other reactor types because of the general relevance of the problems discussed and the long experience upon which it is based. It has, naturally, no regulatory character but it is hoped that it will be found helpful by staff occupied in all phases of the practical operation of research reactors, and also by those responsible for planning their experimental use. 23 refs, tabs

  2. Integrated Ground Operations Demonstration Units

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of the AES Integrated Ground Operations Demonstration Units (IGODU) project is to demonstrate cost efficient cryogenic operations on a relevant...

  3. Safety operation of training reactor VR-1

    International Nuclear Information System (INIS)

    Matejka, K.

    2001-01-01

    There are three nuclear research reactors in the Czech Republic in operation now: light water reactor LVR-15, maximum reactor power 10 MW t , owner and operator Nuclear Research Institute Rez; light water zero power reactor LR-0, maximum reactor power 5 kW t , owner and operator Nuclear Research Institute Rez and training reactor VR-1 Sparrow, maximum reactor power 5 kW t , owner and operate Faculty of Nuclear Sciences and Physical Engineering, CTU in Prague. The training reactor VR-1 Vrabec 'Sparrow', operated at the Faculty of Nuclear Sciences and Physical Engineering, Czech Technical University in Prague, was started up on December 3, 1990. Particularly it is designed for training the students of Czech universities, preparing the experts for the Czech nuclear programme, as well as for certain research work, and for information programmes in the nuclear programme, as well as for certain research work, and for information programmes in sphere of using the nuclear energy (public relations). (author)

  4. Operating manual for the Bulk Shielding Reactor

    International Nuclear Information System (INIS)

    1983-04-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR

  5. Operating manual for the Bulk Shielding Reactor

    International Nuclear Information System (INIS)

    1987-03-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR

  6. Operating manual for the Bulk Shielding Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR.

  7. Operating manual for the Bulk Shielding Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1983-04-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR.

  8. Preparation fo nuclear research reactors operators

    International Nuclear Information System (INIS)

    Roedel, G.

    1986-01-01

    The experience obtained with the training of operators of nuclear research reactors is presented. The main tool used in the experiments is the IPR-R1 reactor, a TRIGA MARK I type, owned by Nuclear Technology Development Centre (CDTN) of NUCLEBRAS. The structures of the Research Reactors Operators Training Course and of the Radiological Protection Course, as well as the Operators Qualifying and Requalifying Program, all of them prepared at CDTN are also presented. Mention is made of the application of similar experiments to other groups, such as students coming from Nuclear Sciences and Techniques Course of the Federal University of Minas Gerais. (Author) [pt

  9. Preparation of nuclear research reactors operators

    International Nuclear Information System (INIS)

    Roedel, G.

    1986-01-01

    The experience obtained with the training of operators of nuclear research reactors is presented. The main tool used in the experiments is the IPR-R1 reactor, a TRIGA MARK I type, owned by Nuclear Technology Development Centre (CDTN) of NUCLEBRAS. The structures of the Research Reactors Operators Training Course and of the Radiological Protection Course, as well as the Operators Qualifying and Requalifying Program, all of them prepared at CDTN, are also presented. Mention is made of the application of similar experiments to other groups, such as students coming from Nuclear Sciences and Techniques Course of the Federal University of Minas Gerais. (Author) [pt

  10. Reactor operations Brookhaven medical research reactor, Brookhaven high flux beam reactor informal monthly report

    International Nuclear Information System (INIS)

    Hauptman, H.M.; Petro, J.N.; Jacobi, O.

    1995-04-01

    This document is the April 1995 summary report on reactor operations at the Brookhaven Medical Research Reactor and the Brookhaven High Flux Beam Reactor. Ongoing experiments/irradiations in each are listed, and other significant operations functions are also noted. The HFBR surveillance testing schedule is also listed

  11. Management of operational events in research reactor

    International Nuclear Information System (INIS)

    Zhong Heping; Yang Shuchun; Peng Xueming

    2001-01-01

    The author describes the tracing management process post-operational event in a research reactor based on nuclear safety code, under the background of the research reactor in Nuclear Power Institute of China. It presorts the definite measures to the event tracing and it up its management factors

  12. Method of operating heavy water moderated reactors

    International Nuclear Information System (INIS)

    Masuda, Hiroyuki.

    1980-01-01

    Purpose: To enable stabilized reactor control, and improve the working rate and the safety of the reactor by removing liquid poison in heavy water while maintaining the power level constant to thereby render the void coefficient of the coolants negative in the low power operation. Method: The operation device for a heavy water moderated reactor comprises a power detector for the reactor, a void coefficient calculator for coolants, control rods inserted into the reactor, a poison regulator for dissolving poisons into or removing them out of heavy water and a device for removing the poisons by the poison regulator device while maintaining the predetermined power level or inserting the control rods by the signals from the power detector and the void coefficient calculator in the high temperature stand-by conditions of the reactor. Then, the heavy water moderated reactor is operated so that liquid poisons in the heavy water are eliminated in the high temperature stand-by condition prior to the start for the power up while maintaining the power level constant and the plurality of control rods are inserted into the reactor core and the void coefficient of the coolants is rendered negative in the low power operation. (Seki, T.)

  13. Impact of proposed research reactor standards on reactor operation

    Energy Technology Data Exchange (ETDEWEB)

    Ringle, J C; Johnson, A G; Anderson, T V [Oregon State University (United States)

    1974-07-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  14. Impact of proposed research reactor standards on reactor operation

    International Nuclear Information System (INIS)

    Ringle, J.C.; Johnson, A.G.; Anderson, T.V.

    1974-01-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  15. Operational safety and reactor life improvements of Kyoto University Reactor

    International Nuclear Information System (INIS)

    Utsuro, M.; Fujita, Y.; Nishihara, H.

    1990-01-01

    Recent important experience in improving the operational safety and life of a reactor are described. The Kyoto University Reactor (KUR) is a 25-year-old 5 MW light water reactor provided with two thermal columns of graphite and heavy water as well as other kinds of experimental facilities. In the graphite thermal column, noticeable amounts of neutron irradiation effects had accumulated in the graphite blocks near the core. Before the possible release of the stored energy, all the graphite blocks in the column were successfully replaced with new blocks using the opportunity provided by the installation of a liquid deuterium cold neutron source in the column. At the same time, special seal mechanisms were provided for essential improvements to the problem of radioactive argon production in the column. In the heavy-water thermal column we have accomplished the successful repair of a slow leak of heavy water through a thin instrumentation tube failure. The repair work included the removal and reconstructions of the lead and graphite shielding layers and welding of the instrumentation tube under radiation fields. Several mechanical components in the reactor cooling system were also exchanged for new components with improved designs and materials. On-line data logging of almost all instrumentation signals is continuously performed with a high speed data analysis system to diagnose operational conditions of the reactor. Furthermore, through detailed investigations on critical components, operational safety during further extended reactor life will be supported by well scheduled maintenance programs

  16. REACTOR CONTROL ROD OPERATING SYSTEM

    Science.gov (United States)

    Miller, G.

    1961-12-12

    A nuclear reactor control rod mechanism is designed which mechanically moves the control rods into and out of the core under normal conditions but rapidly forces the control rods into the core by catapultic action in the event of an emergency. (AEC)

  17. Operational and reliability experience with reactor instrumentation

    International Nuclear Information System (INIS)

    Dixon, F.; Gow, R.S.

    1978-01-01

    In the last 15 years the CEGB has experienced progressive plant development, integration and changes in operating regime through nine nuclear (gas-cooled reactor) power stations with corresponding instrumentation advances leading towards more refined centralized control. Operation and reliability experience with reactor instrumentation is reported in this paper with reference to the progressive changes related to the early magnox, late magnox and AGR periods. Data on instrumentation reliability in terms of reactor forced outages are presented and show that the instrumentation contributions to loss of generating plant availability are small. Reactor safety circuits, neutron flux and temperature measurements, gas analysis and vibration monitoring are discussed. In reviewing the reactor instrumentation the emphasis is on reporting recent experience, particularly on AGR equipment, but overall performance and changes to magnox equipment are included so that some appreciation can be obtained of instrumentation requirements with respect to plant lifetimes. (author)

  18. Fuel deposits, chemistry and CANDU® reactor operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    2014-01-01

    'Hot conditioning' is a process which occurs as part of commissioning and initial start-up of each CANDU® reactor, the first being the Nuclear Power Demonstration - 2 reactor (NPD). Later, understanding of the cause of the failure of the Pickering Unit 1 G16 fuel channelled to a revised approach to 'hot conditioning', initially demonstrated on Bruce Unit 5. The difference being that during 'hot conditioning' of CANDU® heat transport systems fuel was not in-core until Bruce Unit 5. The 'hot conditioning' processes will be briefly described along with the consequences to fuel. (author)

  19. Life extension of the St. Lucie unit 1 reactor vessel

    International Nuclear Information System (INIS)

    Rowan, G.A.; Sun, J.B.; Mott, S.L.

    1991-01-01

    In late 1989, Florida Power and Light Company (FP and L) established the policy that St. Lucie unit 1 should not be prevented from achieving a 60-yr operating life by reactor vessel embrittlement. A 60-yr operating life means that the plant would be allowed to operate until the year 2036, which is 20 years beyond the current license expiration date of 2016. Since modifications to the reactor vessel and its components are projected to be expensive, the desire of FP and L management was to achieve this lifetime extension through the use of fuel management and proven technology. The following limitations were placed on any acceptable method for achieving this lifetime extension capability: low fuel cycle cost; low impact on safety parameters; very little or no operations impact; and use of normal reactor materials. A task team was formed along with the Advanced Nuclear Fuels Company (ANF) to develop a vessel-life extension program

  20. Operational reactor physics analysis codes (ORPAC)

    International Nuclear Information System (INIS)

    Kumar, Jainendra; Singh, K.P.; Singh, Kanchhi

    2007-07-01

    For efficient, smooth and safe operation of a nuclear research reactor, many reactor physics evaluations are regularly required. As part of reactor core management the important activities are maintaining core reactivity status, core power distribution, xenon estimations, safety evaluation of in-pile irradiation samples and experimental assemblies and assessment of nuclear safety in fuel handling/storage. In-pile irradiation of samples requires a prior estimation of the reactivity load due to the sample, the heating rate and the activity developed in it during irradiation. For the safety of personnel handling irradiated samples the dose rate at the surface of shielded flask housing the irradiated sample should be less than 200 mR/Hr.Therefore, a proper shielding and radioactive cooling of the irradiated sample are required to meet the said requirement. Knowledge of xenon load variation with time (Startup-curve) helps in estimating Xenon override time. Monitoring of power in individual fuel channels during reactor operation is essential to know any abnormal power distribution to avoid unsafe situations. Complexities in the estimation of above mentioned reactor parameters and their frequent requirement compel one to use computer codes to avoid possible human errors. For efficient and quick evaluation of parameters related to reactor operations such as xenon load, critical moderator height and nuclear heating and reactivity load of isotope samples/experimental assembly, a computer code ORPAC (Operational Reactor Physics Analysis Codes) has been developed. This code is being used for regular assessment of reactor physics parameters in Dhruva and Cirus. The code ORPAC written in Visual Basic 6.0 environment incorporates several important operational reactor physics aspects on a single platform with graphical user interfaces (GUI) to make it more user-friendly and presentable. (author)

  1. Advanced Reactor Development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Giessing, D. F.; Griffith, J. D.; McGoff, D. J.; Rosen, Sol [U. S. Department of Energy, Texas (United States)

    1990-04-15

    In the United States, three technologies are employed for the new generation of advanced reactors. These technologies are Advanced Light Water Reactors (A LWRs) for the 1990s and beyond, the Modular High Temperature Gas Reactor (M HTGR) for commercial use after the turn of the century, and Liquid Metal Reactors (LWRs) to provide energy production and to convert reactor fission waste to a more manageable waste product. Each technology contributes to the energy solution. Light Water Reactors For The 1990s And Beyond--The U. S. Program The economic and national security of the United States requires a diversified energy supply base built primarily upon adequate, domestic resources that are relatively free from international pressures. Nuclear energy is a vital component of this supply and is essential to meet current and future national energy demands. It is a safe, economically continues to contribute to national energy stability, and strength. The Light Water Reactor (LWR) has been a major and successful contributor to the electrical generating needs of many nations throughout the world. It is being counted upon in the United States as a key to revitalizing nuclear energy option in the 1990s. In recent years, DOE joined with the industry to ensure the availability and future viability of the LWR option. This national program has the participation of the Nation's utility industry, the Electric Power Research Institute (EPRI), and several of the major reactor manufacturers and architect-engineers. Separate but coordinated parts of this program are managed by EPRI and DOE.

  2. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1992-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. For continuous training of the existing operator staff the Service has prepared and published eleven booklets: Nuclear reactor; RA reactor primary coolant loop; System for purification of heavy water; reactor helium system; system for technical water; electric power system; control and operation; ventilation system in the reactor building; special sewage system; construction properties of the reactor core; reactor building and installations. During the reporting period there have been no accidents nor incidents that could affect the reactor personnel [sr

  3. Operational behaviour of a reactor normal operation and disturbances

    International Nuclear Information System (INIS)

    Geyer, K.H.

    1982-01-01

    During normal operation, the following topics are dealt with: primary and secondary coolant circuits - full load operation - start-up and shutdown - steady state part load diagramm. During disturbances and incidents, the following procedures are discussed: identification and detection of the events - automatic actions - manual actions of the operator - provided indications - explanation of actuated systems - basic information of reactor protection system. (RW)

  4. Dynamics of nuclear reactor operational cycles

    International Nuclear Information System (INIS)

    Chapman, L.D.; Wayland, J.R.

    With this system dynamics computer model, one can explore the long term effects of a nuclear reactor program. Given an input demand for reactors, the consequences on each sector and the interactions among sectors can be simulated to provide a better understanding of the time development of a nuclear reactor program. The model permits the determination of various levels of activity as a function of time for plant enrichment, fuel fabrication, fuel reprocessing and storage of waste products. In addition, the rates of construction of reactors, spent fuel transit, disposal of waste, mining, shipping, recycling and enrichment can be investigated for optimal planning purposes. The model has been written in a very general manner so that it can be used to simulate any nuclear reactor program. It is an easy task to relate the amount of accidental or operational release of radioactive contaminants into our environment to the activity levels of each of the above sectors. (U.S.)

  5. Reactor operation plan preparing device

    International Nuclear Information System (INIS)

    Sano, Hiroki; Maruyama, Hiromi; Kinoshita, Mitsuo; Fukuzaki, Koji; Banto, Masaru; Fukazawa, Yukihisa.

    1993-01-01

    The device comprises a means for retrieving a control rod pattern capable of satisfying a thermal limit upon aimed power/minimum flow rate and providing minimum xenon and a control rod pattern maximum xenon. It further comprises a means for selecting a control rod pattern corresponding to a xenon equilibrium condition, and selecting a control rod which provides a greater thermal margin to provide a control rod operation sequence for each of the patterns. Further, the device comprises an outline plan preparing means and a correction means therefor, a simplified sequence table reference means operated along with sequence change, an operation limit region input means, a control rod operation preferential region changing means, a thermal margin evaluation region and an input means. This can automatically prepare the operation plan, decrease the times for preparation of detailed plans by using the outline plan preparing function, thereby enabling to remarkably shorten the time for preparing of an operation plan. (N.H.)

  6. Licensed operating reactors. Status summary report, data as of August 31, 1983. Volume 8, No. 9

    International Nuclear Information System (INIS)

    1984-10-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Method of operating FBR type reactors

    International Nuclear Information System (INIS)

    Arie, Kazuo.

    1984-01-01

    Purpose: To secure the controlling performance and the safety of FBR type reactors by decreasing the amount of deformation due to the difference in the heat expansion of a control rod guide tube. Method: The reactor is operated while disposing reactor core fuel assemblies of a same power at point-to-point symmetrical positions relative to the axial center for the control rod assembly. This can eliminate the temperature difference between opposing surfaces of the control rod guide tube and eliminate the difference in the thermal expansion. (Yoshino, Y.)

  8. Operation of Packed-Bed Reactors Studied in Microgravity

    Science.gov (United States)

    Motil, Brian J.; Balakotaiah, Vemuri

    2004-01-01

    The operation of a packed bed reactor (PBR) involves gas and liquid flowing simultaneously through a fixed-bed of solid particles. Depending on the application, the particles can be various shapes and sizes but are generally designed to force the two fluid phases through a tortuous route of narrow channels connecting the interstitial space. The PBR is the most common type of reactor in industry because it provides for intimate contact and high rates of transport between the phases needed to sustain chemical or biological reactions. The packing may also serve as either a catalyst or as a support for growing biological material. Furthermore, this type of reactor is relatively compact and requires minimal power to operate. This makes it an excellent candidate for unit operations in support of long-duration human space activities.

  9. Fuel deposits, chemistry and CANDU reactor operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    2013-01-01

    'Hot conditioning' is a process which occurs as part of commissioning and initial start-up of each CANDU reactor, the first being the Nuclear Power Demonstration-2 reactor (NPD). Later, understanding of the cause of the failure of the Pickering Unit 1 G16 fuel channel led to a revised approach to 'hot conditioning', initially demonstrated on Bruce Unit 5, and subsequently utilized for each CANDU unit since. The difference being that during 'hot conditioning' of CANDU heat transport systems fuel was not in-core until Bruce Unit 5. The 'hot conditioning' processes will be briefly described along with the consequences to fuel. (author)

  10. Mode of operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Morita, T.

    1976-01-01

    A method is proposed for the operation of a nuclear reactor guaranteeing an essentially symmetrical axial power distribution during normal operation by controlling the changes occuring in the reactor power partly by variation of the concentration of the neutron-absorbing element and partly by variation of the control rod positions. The representative parameters are recorded for the upper and lower half and adjusted to a predetermined reference value. In using this method, the axial power peals are reduced and power losses avoided. (RW) [de

  11. Method of operating BWR type reactors

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1980-01-01

    Purpose: To enable reactor control depending on any demanded loads by performing control by the insertion of control rods in addition to the control by the regulation of the flow rate of the reactor core water at high power operation of a BWR type reactor. Method: The power is reduced at high power operation by decreasing the flow rate of reactor core water from the starting time for the power reduction and the flow rate is maintained after the time at which it reaches the minimum allowable flow rate. Then, the control rod is started to insert from the above time point to reduce the power to an aimed level. Thus, the insufficiency in the reactivity due to the increase in the xenon concentration can be compensated by the withdrawal of the control rods and the excess reactivity due to the decrease in the xenon concentration can be compensated by the insertion of the control rods, whereby the reactor power can be controlled depending on any demanded loads without deviating from the upper or lower limit for the flow rate of the reactor core water. (Moriyama, K.)

  12. Operational safety evaluation for minor reactor accidents

    International Nuclear Information System (INIS)

    Wang, O.S.

    1981-01-01

    The purpose of this paper is to address a concern of applying conservatism in analysing minor reactor incidents. A so-called ''conservative'' safety analysis may exaggerate the system responses and result in a reactor scram tripped by the reactor protective system (RPS). In reality, a minor incident may lead the reactor to a new thermal hydraulic steady-state without scram, and the mitigation or termination of the incident may entirely depend on operator actions. An example on a small steamline break evaluation for a pressurized water reactor recently investigated by the staff at the Washington Public Power Supply System is presented to illustrate this point. A safety evaluation using mainly the safety-related systems to be consistent with the conservative assumptions used in the Safety Analysis Report was conducted. For comparison, a realistic analysis was also performed using both the safety- and control-related systems. The analyses were performed using the RETRAN plant simulation computer code. The ''conservative'' safety analysis predicts that the incident can be turned over by the RPS scram trips without operator intervention. However, the realistic analysis concludes that the reactor will reach a new steady-state at a different plant thermal hydraulic condition. As a result, the termination of the incident at this stage depends entirely on proper operator action. On the basis of this investigation it is concluded that, for minor incidents, ''conservative'' assumptions are not necessary, sometimes not justifiable. A realistic investigation from the operational safety point of view is more appropriate. It is essential to highlight the key transient indications for specific incident recognition in the operator training program

  13. New generation nuclear power units of PWR type integral reactors

    International Nuclear Information System (INIS)

    Mitenkov, F.M.; Kurachen Kov, A.V.; Malamud, V.A.; Panov, Yu.K.; Runov, B.I.; Flerov, L.N.

    1997-01-01

    Design bases of new generation nuclear power units (nuclear power plants - NPP, nuclear co-generation plants - NCP, nuclear distract heating plants - NDHP), using integral type PWPS, developed in OKBM, Nizhny Novgorod and trends of design decisions optimization are considered in this report. The problems of diagnostics, servicing and repair of the integral reactor components in course of operation are discussed. The results of safety analysis, including the problems of several accident localization with postulated core melting and keeping corium in the reactor vessel and guard vessel are presented. Information on experimental substantiation of the suggested plant design decisions is presented. (author)

  14. Licensed operating reactors: status summary report, data as of May 31, 1982

    International Nuclear Information System (INIS)

    1982-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. Licensed operating reactors: Status summary report, data as of 02-28-89

    International Nuclear Information System (INIS)

    1989-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactor Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  16. Licensed operating reactors status summary report data as of January 31, 1989

    International Nuclear Information System (INIS)

    Schwartz, I.

    1989-03-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information, such as spent fuel storage capability, reactor years of experience, and non-power reactors in the United States

  17. Licensed operating reactors. Status summary report, data as of 8-31-82

    International Nuclear Information System (INIS)

    1982-09-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  18. Licensed operating reactors: Status summary report data as of 9-30-86

    International Nuclear Information System (INIS)

    1987-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices. IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  19. Licensed operating reactors status summary report, data as of December 31, 1988

    International Nuclear Information System (INIS)

    1989-02-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  20. Licensed operating reactors status summary report data as of April 30, 1983. Vol. 7, No. 5

    International Nuclear Information System (INIS)

    1983-05-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  1. Licensed operating reactors. Status summary report data as of October 31, 1982

    International Nuclear Information System (INIS)

    1982-11-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. Licensed operating reactors: status summary report, data as of May 31, 1983. Volume 7, No. 6

    International Nuclear Information System (INIS)

    1983-06-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  3. Licensed operating reactors: Status summary report, data as of 11-30-88

    International Nuclear Information System (INIS)

    1989-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information, such as spent fuel storage capability, reactor years of experience, and non-power reactors in the United States

  4. Licensed operating reactors: Status summary report, Data as of 08-31-86

    International Nuclear Information System (INIS)

    1987-03-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  5. Control unit of a nuclear reactor

    International Nuclear Information System (INIS)

    Desfontaines, Guy; Le Helloco, Michel.

    1981-01-01

    Control unit comprising multiple leak-tight vessels, in communication with the inside of the reactor vessel, extending this vessel above its cover, in the vertical direction and each one enclosing a mechanism for moving a cluster of material absorbing the neutrons in the reactor core, actuated by a motor. This control unit is of reduced height above the vessel cover and provides efficient protection of the leak tight containments and the mechanisms in the event of earthquakes, easy removal and refitting of the vessel cover, good ventilation of the power devices of the mechanisms without the use of a complex ventilation system, efficient thermal insulation of the leak-tight containments assembly, as well as easy access to the motors and mechanism located in the leak-tight containment for carrying out any maintenance and repairs that might be required [fr

  6. Fuel management for TRIGA reactor operators

    International Nuclear Information System (INIS)

    Totenbier, R.E.; Levine, S.H.

    1980-01-01

    One responsibility of the Supervisor of Reactor Operations is to follow the TRIGA core depletion and recommend core loading changes for refueling and special experiments. Calculations required to analyze such changes normally use digital computers and are extremely difficult to perform for one who is not familiar with computer language and nuclear reactor diffusion theory codes. The TRICOM/SCRAM program developed to perform such calculations for the Penn State TRIGA Breazeale Reactor (PSBR), has a very simple input format and is one which can be used by persons having no knowledge of computer codes. The person running the program need not understand computer language such as Fortran, but should be familiar with reactor core geometry and effects of loading changes. To further simplify the input requirements but still allow for all of the studies normally needed by the reactor operations supervisor, the options required for input have been isolated to two. Given a master deck of computer cards one needs to change only three cards; a title card, core energy history information card and one with core changes. With this input, the program can provide individual fuel element burn-up for a given period of operation and the k eff of the core. If a new loading is desired, a new master deck containing the changes is also automatically provided. The life of a new core loading can be estimated by feeding in projected core burn-up factors and observing the resulting loss in individual fuel elements. The code input and output formats have now been made sufficiently convenient and informative as to be incorporated into a standard activity for the Reactor Operations Supervisor. (author)

  7. Regulations and instructions for RA reactor operation

    International Nuclear Information System (INIS)

    1989-01-01

    This regulatory guide consists of following 4 chapters: Description of the RA reactor, organization scheme, regulations for performing experiments; Regulations for staff on duty; Instructions for operating the vacuum systems, heavy water and helium systems; and evacuation in case of accident [sr

  8. Graphics and control for in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1996-01-01

    A wide range of manipulator systems has been developed to carry out remotely operated inspection, repair and maintenance tasks at the Magnox reactors in the United Kingdom. A key factor in the improvement of these systems in recent years has been the extensive use of computer graphics as a real-time aid to the manipulator operator. This is exemplified by the reactor pressure vessel inspection work at the Bradwell reactor which is described in detail. The graphics sub-system of the control system for the manipulator plays a unique and wide-ranging role. The 3D modelling and simulation capability of the IGRIP software has contributed to the conceptual design, detailed path planning, rehearsal support, public relations, real-time manipulator display, post inspection documentation and quality assurance. (UK)

  9. The SM and MIR reactors operation experience

    International Nuclear Information System (INIS)

    Kuprienko, V.A.; Klinov, A.V.; Svyatkin, M.N.; Shamardin, V.K.

    1995-01-01

    The SM and MIR operation experience show that continuous work on the problem of ageing, in all its aspects, allows for prolongation of the research plant life cycle by several folds as compared to the initial project. The redesigned SM-3 reactor will operate for another 20 years. The similar result is expected from the MIR planned reconstruction which scope will be the topic of future presentations. (orig.)

  10. Fusion reactor design studies: standard unit costs and cost scaling rules

    International Nuclear Information System (INIS)

    Schulte, S.C.; Bickford, W.E.; Willingham, C.E.; Ghose, S.K.; Walker, M.G.

    1979-09-01

    This report establishes standard unit costs and scaling rules for estimating costs of material, equipment, land, and labor components used in magnetic confinement fusion reactor plant construction and operation. Use of the standard unit costs and scaling rules will add uniformity to cost estimates, and thus allow valid comparison of the economic characteristics of various reactor concepts

  11. Good practices in heavy water reactor operation

    International Nuclear Information System (INIS)

    2010-06-01

    The value and importance of organizations in the nuclear industry engaged in the collection and analysis of operating experience and best practices has been clearly identified in various IAEA publications and exercises. Both facility safety and operational efficiency can benefit from such information sharing. Such sharing also benefits organizations engaged in the development of new nuclear power plants, as it provides information to assist in optimizing designs to deliver improved safety and power generation performance. In cooperation with Atomic Energy of Canada, Ltd, the IAEA organized the workshop on best practices in Heavy Water Reactor Operation in Toronto, Canada from 16 to 19 September 2008, to assist interested Member States in sharing best practices and to provide a forum for the exchange of information among participating nuclear professionals. This workshop was organized under Technical Cooperation Project INT/4/141, on Status and Prospects of Development for and Applications of Innovative Reactor Concepts for Developing Countries. The workshop participants were experts actively engaged in various aspects of heavy water reactor operation. Participants presented information on activities and practices deemed by them to be best practices in a particular area for consideration by the workshop participants. Presentations by the participants covered a broad range of operational practices, including regulatory aspects, the reduction of occupational dose, performance improvements, and reducing operating and maintenance costs. This publication summarizes the material presented at the workshop, and includes session summaries prepared by the chair of each session and papers submitted by the presenters

  12. Experience in using a research reactor for the training of power reactor operators

    International Nuclear Information System (INIS)

    Blotcky, A.J.; Arsenaut, L.J.

    1972-01-01

    A research reactor facility such as the one at the Omaha Veterans Administration Hospital would have much to offer in the way of training reactor operators. Although most of the candidates for the course had either received previous training in the Westinghouse Reactor Operator Training Program, had operated nuclear submarine reactors or had operated power reactors, they were not offered the opportunity to perform the extensive manipulations of a reactor that a small research facility will allow. In addition the AEC recommends 10 research reactor startups per student as a prerequisite for a cold operator?s license and these can easily be obtained during the training period

  13. A review of the United Kingdom fast reactor program - March 1983

    International Nuclear Information System (INIS)

    Smith, R.D.

    1983-01-01

    A review of the United Kingdom Fast Reactor Programme was given in March 1983. Operational experience with the Prototype Fast Reactor (PFR) is briefly summarized. The design concept of the Commercial Demonstration Fast Reactor (CDFR), including design codes, engineering components, materials and fuels development, chemical engineering/sodium technology, safety and reactor performance, is reviewed. The problems of PFR and CDFR fuel reprocessing are also discussed

  14. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  15. Reactor containment and reactor safety in the United States

    International Nuclear Information System (INIS)

    Kouts, H.

    1986-01-01

    The reactor safety systems of two reactors are studied aiming at the reactor containment integrity. The first is a BWR type reactor and is called Peachbottom 2, and the second is a PWR type reactor, and is called surry. (E.G.) [pt

  16. Experimental evaluation of an expert system for nuclear reactor operators

    International Nuclear Information System (INIS)

    Nelson, W.R.

    1984-10-01

    The United States Nuclear Regulatory Commission (USNRC) is supporting a program for the experimental evaluation of an expert system for nuclear reactor operators. A prototype expert system, called the Response Tree System, has been developed and implemented at INEL. The Response Tree System is designed to assess the status of a reactor system following an accident and recommend corrective actions to reactor operators. The system is implemented using color graphic displays and is driven by a computer simulation of the reactor system. Control of the system is accomplished using a transparent touch panel. Controlled experiments are being conducted to measure performance differences between operators using the Response Tree System and those not using it to respond to simulated accident situations. This paper summarizes the methodology and results of the evaluation of the Response Tree System, including the quantitative results obtained in the experiments thus far. Design features of the Response Tree System are discussed, and general conclusions regarding the applicability of expert systems in reactor control rooms are presented

  17. Fractional power operation of tokamak reactors

    International Nuclear Information System (INIS)

    Mau, T.K.; Vold, E.L.; Conn, R.W.

    1986-01-01

    Methods to operate a tokamak fusion reactor at fractions of its rated power, identify the more effective control knobs and assess the impact of the requirements of fractional power operation on full power reactor design are explored. In particular, the role of burn control in maintaining the plasma at thermal equilibrium throughout these operations is studied. As a prerequisite to this task, the critical physics issues relevant to reactor performance predictions are examined and some insight into their impact on fractional power operation is offered. The basic tool of analysis consists of a zero-dimensional (0-D) time-dependent plasma power balance code which incorporates the most advanced data base and models in transport and burn plasma physics relevant to tokamaks. Because the plasma power balance is dominated by the transport loss and given the large uncertainty in the confinement model, the authors have studied the problem for a wide range of energy confinement scalings. The results of this analysis form the basis for studying the temporal behavior of the plasma under various thermal control mechanisms. Scenarios of thermally stable full and fractional power operations have been determined for a variety of transport models, with either passive or active feedback burn control. Important power control parameters, such as gas fueling rate, auxiliary power and other plasma quantities that affect transport losses, have also been identified. The results of these studies vary with the individual transport scaling used and, in particular, with respect to the effect of alpha heating power on confinement

  18. Method of controlling the reactor operation

    International Nuclear Information System (INIS)

    Ishiguro, Akira; Nakakura, Hiroyuki.

    1987-01-01

    Purpose: To moderate vibratory response due to delayed operation thereby obtain stable controlled response in the operation control for a PWR type reactor. Method: the reactor operation is controlled by the axial power distribution control by regulating the boron concentration in primary coolants with a boron density control system and controlling the average temperature for the primary coolants with the control rod control system. In this case, the control operation and the control response become instable due to transmission delay, etc. of aqueous boric acid injection to the primary coolant circuits to result in vibratory response. In the present invention, signals are prepared by adding the amount in proportion to the variation coefficient with time of xenone concentration obtained from the measured value for the reactor power added to the conventional axial power distribution parameter deviation and used as the input signals for the boron concentration control system. As a result, the instability due to the transmission delay of the aqueous boric acid injection is improved by the preceding control by the amount in proportion with the variation coefficient with time of the xenone concentration. An advantageous effect can be expected for the load following operation during day time according to the present invention. (Kamimura, M.)

  19. 1984 Operation of the high flux reactor

    International Nuclear Information System (INIS)

    1985-01-01

    The programme resources in 1984 were largely devoted to the replacement of the old reactor vessel and its peripheral equipment. The original vessel had been in operation for more than 20 years and doubts had arisen about the condition of the aluminium tank after so long an exposure to neutrons. The operation, which had never been attempted before on a reactor of that size and complexity was planned and prepared over a number of years to take advantage of the occasion to provide a much improved vessel, incorporating the latest design features. The plant was shut down at the end of November 1983 and the 14 months operation began with a short cooling-off period for decay of short lived radioactivity followed by removal of the old tank and its dissection into pieces convenient for consolidation and storage as radioactive waste. After decontamination of the shielding pool, the new vessel and neutron beam tubes were installed and the reactor was recommissioned. Routine 45 MW operation was resumed on 14 February 1985 and has been uneventful since then

  20. Intelligence system for reactor operator informational support

    International Nuclear Information System (INIS)

    Prangishvili, I.V.; Pashchenko, F.F.; Saprykin, E.M.

    1989-01-01

    Problems related to creation and introduction at NPP of highly efficient and reliable systems for monitoring and control of working processes and intelligence-endowed systems of operator informational support (ISOIS) are considered. The main units included in ISOIS are considered. The main units included in ISOIS are described. The unit of current state monitoring provides information for the operator, which is necessary under concrete conditions for the process monitoring and control, so as to avoid emergencies and affers a program of actions in a dialogue mode for the operator. The identification unit is designed for the obtaining of assessed values of process parameters (neutron fields, temperatures, pressures) and basic equipment (reactivity coefficients, fuel rod weights, time of delay). The prediction unit evaluates the behaviour of process parameters and process state in various situations. 9 refs

  1. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  2. Safe operation and maintenance of research reactor

    International Nuclear Information System (INIS)

    Munsorn, S.

    1999-01-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U 3 O 8 - Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  3. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  4. Safeguards operations in the integral fast reactor fuel cycle

    International Nuclear Information System (INIS)

    Goff, K.M.; Benedict, R.W.; Brumbach, S.B.; Dickerman, C.E.; Tompot, R.W.

    1994-01-01

    Argonne National Laboratory is currently demonstrating the fuel cycle for the Integral Fast Reactor (IFR), an advanced reactor concept that takes advantage of the properties of metallic fuel and liquid metal cooling to offer significant improvements in reactor safety, operation, fuel-cycle economics, environmental protection, and safeguards. The IFR fuel cycle employs a pyrometallurgical process using molten salts and liquid metals to recover actinides from spent fuel. The safeguards aspects of the fuel cycle demonstration must be approved by the United States Department of Energy, but a further goal of the program is to develop a safeguards system that could gain acceptance from the Nuclear Regulatory Commission and International Atomic Energy Agency. This fuel cycle is described with emphasis on aspects that differ from aqueous reprocessing and on its improved safeguardability due to decreased attractiveness and diversion potential of all process streams, including the fuel product

  5. Status of reactor shielding research in the United States

    International Nuclear Information System (INIS)

    Bartine, D.E.

    1983-01-01

    Shielding research in the United States continues to place emphasis on: (1) the development and refinement of shielding design calculational methods and nuclear data; and (2) the performance of confirmation experiments, both to evaluate specific design concepts and to verify specific calculational techniques and input data. The successful prediction of the radiation levels observed within the now-operating Fast Flux Test Facility (FFTF) has demonstrated the validity of this two-pronged approach, which has since been applied to US fast breeder reactor programs and is now being used to determine radiation levels and possible further shielding needs at operating light water reactors, especially under accident conditions. A similar approach is being applied to the back end of the fission fuel cycle to verify that radiation doses at fuel element storage and transportation facilities and within fuel reprocessing plants are kept at acceptable levels without undue economic penalties

  6. Operator Support System for Pressurized Water Reactor

    International Nuclear Information System (INIS)

    Wei Renjie; Shen Shifei

    1996-01-01

    Operator Support System for Pressurized Water Reactor (OSSPWR) has been developed under the sponsorship of IAEA from August 1994. The project is being carried out by the Department of Engineering Physics, Tsinghua University, Beijing, China. The Design concepts of the operator support functions have been established. The prototype systems of OSSPWR has been developed as well. The primary goal of the project is to create an advanced operator support system by applying new technologies such as artificial intelligence (AI) techniques, advanced communication technologies, etc. Recently, the advanced man-machine interface for nuclear power plant operators has been developed. It is connected to the modern computer systems and utilizes new high performance graphic displays. (author). 6 refs, 4 figs

  7. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  8. New control and safety rod unit for the training reactor of the Dresden Technical University

    International Nuclear Information System (INIS)

    Adam, E.; Schab, J.; Knorr, J.

    1983-01-01

    The extension of the experimental training of students at the training reactor AKR of the Dresden Technical University requires the reconstruction of the reactor with a new control and safety rod unit. The specific conditions at the AKR led to a new variant. Results of preliminary experiments, design and mode of operation of the first unit as well as hitherto gained operation experiences are presented. (author)

  9. Reactor operations for nuclear pumping of lasers

    Energy Technology Data Exchange (ETDEWEB)

    Beck, G; Cooper, G [University of Illinois (United States)

    1974-07-01

    Experiments involving the measurement of gas parameters that are related to lasing, and lasing of various gas mixtures have comprised a major part of the utilization of the University of Illinois Advanced TRIGA Reactor since the upgrading of the facility was completed in 1969. A thru beam port, which was added during upgrading, has been the facility used for these measurements. The laser cell is placed in the port adjacent to the core. Alignment is then accomplished by using both ends of the port or by a mirror placed at the back side of the apparatus. The reactor has been operated in all modes (pulsing, square wave, and steady state) for the experiments although pulsing is the primary mode that is used. Laser enhancement has been obtained in several cases, but efforts toward direct pumping from the radiation alone have not as yet succeeded. Improved laser operation from direct pumping has been suggested with an emphasis on high-powered systems where the basic input energy is to be derived from a nuclear reactor.

  10. Review of fast reactor operating experience gained in 1998 in Russia. General trends of future fast reactor development

    International Nuclear Information System (INIS)

    Poplavski, V.M.; Ashurko, Y.M.; Zverev, K.V.; Sarayev, O.M.; Oshkanov, N.N.; Korol'kov, A.S.

    1999-01-01

    Review of the general state of nuclear power in Russia as for 1998 is given in brief in the paper. Results of operation of BR-10, BOR-60 and BN-600 fast reactors are presented as well as of scientific and technological escort of the BN-350 reactor. The paper outlines the current status and prospects of South-Urals and Beloyarskaya power unit projects with the BN-800 reactors. The main planned development trends on fast reactors are described concerning both new projects and R and D works. (author)

  11. Control of water chemistry in operating reactors

    International Nuclear Information System (INIS)

    Riess, R.

    1997-01-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ''modified'' B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs

  12. Control of water chemistry in operating reactors

    Energy Technology Data Exchange (ETDEWEB)

    Riess, R [Siemens AG Unternehmensbereich KWU, Erlangen (Germany)

    1997-02-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ``modified`` B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs.

  13. Linguistic Formalism for Semi-Autonomous Reactor Operation

    International Nuclear Information System (INIS)

    Joo, Sungmoon; Seo, Sang Mun; Suh, Yong-Suk; Park, Cheol

    2017-01-01

    The ultimate goal of our work is to develop a novel, integrated system for semi-autonomous reactor operation by introducing an interfacing language shared by human reactor operators and artificially intelligent service agents (e.g., robots). We envision that human operators and artificially intelligent service agents operate the reactor cooperatively in the future. For example, an artificially intelligent service agent carries out a human reactor operator's command or reports the result of a task commanded by the human reactor operator. This work presents preliminary work towards a unified linguistic formalism for cooperative, semiautonomous reactor operation. Application of the proposed formalism to reactor operator communication domain shows that the formalism effectively captures the syntax and semantics of the domain-specific language defined by the communication protocol.

  14. Calculation of the real states of Ignalina NPP Unit 1 and Unit 2 RBMK-1500 reactors in the verification process of QUABOX/CUBBOX code

    International Nuclear Information System (INIS)

    Bubelis, E.; Pabarcius, R.; Demcenko, M.

    2001-01-01

    Calculations of the main neutron-physical characteristics of RBMK-1500 reactors of Ignalina NPP Unit 1 and Unit 2 were performed, taking real reactor core states as the basis for these calculations. Comparison of the calculation results, obtained using QUABOX/CUBBOX code, with experimental data and the calculation results, obtained using STEPAN code, showed that all the main neutron-physical characteristics of the reactors of Unit 1 and Unit 2 of Ignalina NPP are in the safe deviation range of die analyzed parameters, and that reactors of Ignalina NPP, during the process of the reactor core composition change, are operated in a safe and stable manner. (author)

  15. Operation and utilizations of Dalat nuclear research reactor

    International Nuclear Information System (INIS)

    Hien, P.Z.

    1988-01-01

    The reconstructed Dalat nuclear research reactor was commissioned in March 1984 and up to September 1988 more than 6200 hours of operation at nominal power have been recorded. The major utilizations of the reactor include radioisotope production, activation analysis, nuclear data research and training. A brief review of the utilizations of the reactor is presented. Some aspects of reactor safety are also discussed. (author)

  16. Safety evaluation of the Dalat research reactor operation

    International Nuclear Information System (INIS)

    Long, V.H.; Lam, P.V.; An, T.K.

    1989-01-01

    After an introduction presenting the essential characteristics of the Dalat Nuclear Research Reactor, the document presents i) The safety assurance condition of the reactor, ii) Its safety behaviour after 5 years of operation, iii) Safety research being realized on the reactor. Following is questionnaire of safety evaluation and a list of attachments, which concern the reactor

  17. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  18. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  19. Licensed operating reactors: Status summary report, data as of 11-30-86

    International Nuclear Information System (INIS)

    1987-06-01

    The operating units status report - licensed operating reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  20. Licensed operating reactors. Status summary report, data as of April 30, 1986

    International Nuclear Information System (INIS)

    1986-05-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent storage capability, reactor years of experience and non-power reactors in the United States

  1. Licensed operating reactors. Status summary report, data as of February 28, 1986. Volume 10, No. 3

    International Nuclear Information System (INIS)

    1986-04-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  2. Licensed operating reactors status summary report, data as of August 31, 1985. Volume 9, No. 9

    International Nuclear Information System (INIS)

    1985-10-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  3. Licensed operating reactors. Status summary report, data as of May 31, 1986. Volume 10, Number 6

    International Nuclear Information System (INIS)

    1986-08-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  4. Licensed operating reactors. Status summary report: data as of July 31, 1985. Volume 9, No. 8

    International Nuclear Information System (INIS)

    1985-09-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Head-quarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capabilitiy, reactor years of experience and non-power reactors in the United States

  5. Licensed operating reactors: Status summary report data as of 06-30-86

    International Nuclear Information System (INIS)

    1986-11-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  6. Licensed operating reactors. Status summary report data as of January 31, 1986. Volume 10, No. 2

    International Nuclear Information System (INIS)

    1986-03-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Twenty years of health physics research reactor operation

    International Nuclear Information System (INIS)

    Sims, C.S.; Gilley, L.W.

    1983-01-01

    The Health Physics Research Reactor at the Oak Ridge National Laboratory has been in regular use for more than two decades. Safe operation of this fast reactor over this extended period indicates that (1) fundamental design, (2) operational procedures, (3) operator training and performance, (4) maintenance activites, and (5) management have all been eminently satisfactory. The reactor and its uses are described, the operational history and significant events are reviewed, and operational improvements and maintenance are discussed

  8. Research about reactor operator's personality characteristics and performance

    International Nuclear Information System (INIS)

    Wei Li; He Xuhong; Zhao Bingquan

    2003-01-01

    To predict and evaluate the reactor operator's performance by personality characteristics is an important part of reactor operator safety assessment. Using related psychological theory combined with the Chinese operator's fact and considering the effect of environmental factors to personality analysis, paper does the research about the about the relationships between reactor operator's performance and personality characteristics, and offers the reference for operator's selection, using and performance in the future. (author)

  9. Operating experiences at the Finnish TRIGA reactor

    International Nuclear Information System (INIS)

    Salmenhaara, Seppo

    1988-01-01

    The Finnish TRIGA reactor has been in operation since March 1962. There are still 57 original Al-clad fuel elements in the core. So far we have had only two fuel cladding failures in 1981 and 1988. The first one was an Al-clad element and the second one a SS-clad. The low rate of fuel cladding failures has made it possible to use continuously also the Al-clad fuel elements. Although some conventional irradiations of certain type have been repeated successfully tens of times, new and unexpected incidents can still take place. As an example an event of a leaking irradiation capsule is described

  10. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  11. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  12. Operational methods of the fluidized bed nuclear reactor

    International Nuclear Information System (INIS)

    Borges, V.; Sefidvash, F.

    1993-01-01

    The operational curve of reactivity as a function of porosity of the Fluidized Bed Nuclear Reactor is presented. The strategies for start-up, shut-down and maintaining the reactor critical during operation are described. The inherent safety of the reactor from neutronic point of view under steady state condition is demonstrated. (author)

  13. Status of fast breeder reactor development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Horton, K [U.S. Department of Energy, Washington, DC (United States)

    1981-05-01

    The energy policy of the United States is aimed at shifting as rapidly as practicable from an oil dependent economy to one that relies heavily on other fuels and energy sources. Nuclear power Is now and is expected to continue to be an important factor in achieving this goal. If nuclear power is to contribute to a solution of future energy needs, demonstration of the breeder reactor as a viable source of essentially inexhaustible energy supply is essential. The US DOE program for development of the fast breeder reactor has witnessed some notable events in the past year. Foremost among these Is the successful operational testing of the Fast Flux Test Facility (FFTF), located at.the Hanford Engineering Development Laboratory. The reactor reached full design power of 400 MW(t) on December 21, 1980, and has performed remarkably close to design specifications. Design of the Clinch River Breeder Reactor Plant (CRBRP), a 375 MW(e) LMFBR, is now over 80 percent complete. About $530 million in components have been ordered; component deliveries total approximately $124 million; work-in-process totals another $204 million. Construction of the plant, however, has been suspended since 1977. With the concurrence of the U.S. Congress and approvals from the appropriate authorities work on the safety review and site clearing for construction can resume. The Conceptual Design Study for a large, 1000 MW(e) LMFBR Large Developmental Plant was recently completed on a schedule commensurate with submission of a full report to the Congress at the end of March, 1981. This report is the culmination of a study which began in October, 1978 and involved contributions from U.S. reactor manufacturers and US DOE laboratories. The US DOE is carrying forward a comprehensive technology development program. This effort provides direct support to the FFTF and CRBRP projects and to the LDP. It also supports technology development which is generic to the overall LMFBR program. Funding for breeder

  14. Status of fast breeder reactor development in the United States

    International Nuclear Information System (INIS)

    Horton, K.

    1981-01-01

    The energy policy of the United States is aimed at shifting as rapidly as practicable from an oil dependent economy to one that relies heavily on other fuels and energy sources. Nuclear power Is now and is expected to continue to be an important factor in achieving this goal. If nuclear power is to contribute to a solution of future energy needs, demonstration of the breeder reactor as a viable source of essentially inexhaustible energy supply is essential. The US DOE program for development of the fast breeder reactor has witnessed some notable events in the past year. Foremost among these Is the successful operational testing of the Fast Flux Test Facility (FFTF), located at.the Hanford Engineering Development Laboratory. The reactor reached full design power of 400 MW(t) on December 21, 1980, and has performed remarkably close to design specifications. Design of the Clinch River Breeder Reactor Plant (CRBRP), a 375 MW(e) LMFBR, is now over 80 percent complete. About $530 million in components have been ordered; component deliveries total approximately $124 million; work-in-process totals another $204 million. Construction of the plant, however, has been suspended since 1977. With the concurrence of the U.S. Congress and approvals from the appropriate authorities work on the safety review and site clearing for construction can resume. The Conceptual Design Study for a large, 1000 MW(e) LMFBR Large Developmental Plant was recently completed on a schedule commensurate with submission of a full report to the Congress at the end of March, 1981. This report is the culmination of a study which began in October, 1978 and involved contributions from U.S. reactor manufacturers and US DOE laboratories. The US DOE is carrying forward a comprehensive technology development program. This effort provides direct support to the FFTF and CRBRP projects and to the LDP. It also supports technology development which is generic to the overall LMFBR program. Funding for breeder

  15. The United States advanced light water reactor (USALWR) development program

    International Nuclear Information System (INIS)

    Stahlkopf, K.E.; Noble, D.M.; Devine, J.C. Jr.; Sugnet, W.R.

    1987-01-01

    For the United States Nuclear Power industry to remain viable, it must be prepared to meet the expected need for a new generation capacity in the late 90s with an improved reactor system. The best hope of meeting this requirement is with revolutionary changes to current LWR systems through simplification and re-evaluation of safety and operational design margins. In addition, the grid characteristics and the difficulty in raising capital for large projects indicate the smaller light water reactors (600 MWe) may play an important role in the next generation. A cooperative and coordinated program between EPRI, U.S. DOE, the major architect engineers, nuclear steam supply vendors, and the NRC in the U.S. has been undertaken with four major goals in mind

  16. The United States Advanced Light Water reactor (USALWR) development program

    International Nuclear Information System (INIS)

    Stahlkopf, K.E.; Noble, D.M.; Devine, Jr.J.C.; Sugnet, W.R.

    1987-01-01

    For the United States Nuclear power industry to remain viable, it must be prepared to meet the expected need for a new generation capacity in the late 90s with an improved reactor system. The best hope of meeting this requirement is with revolutionary changes to current LWR systems through simplification and re-evaluation of safety and operational design margins. In addition, the grid characteristics and the difficulty in raising capital for large projects indicate the smaller light water reactors (600 MWe) may play an important role in the next generation. A cooperative and coordinated program between EPRI, U.S. DOE, the major architect engineers, nuclear steam supply vendors, and the NRC in the U.S. has been undertaken with four major goals in mind. (author)

  17. Fuel failure detection in operating reactors

    International Nuclear Information System (INIS)

    Seigel, B.; Hagen, H.H.

    1977-12-01

    Activity detectors in commercial BWRs and PWRs are examined to determine their capability to detect a small number of fuel rod failures during reactor operation. The off-gas system radiation monitor in a BWR and the letdown line radiation monitor in a PWR are calculated to have this capability, and events are cited that support this analysis. Other common detectors are found to be insensitive to small numbers of fuel failures. While adequate detectors exist for normal and transient operation, those detectors would not perform rapidly enough to be useful during accidents; in most accidents, however, primary system sensors (pressure, temperature, level) would provide adequate warning. Advanced methods of fuel failure detection are mentioned

  18. Self operation type reactor scram device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1992-01-01

    A control rod having neutron absorbers therein is held by a curie point electromagnet by way of a control rod extension shaft. The electromagnet is suspended from a vertically movable driving shaft in an upper guide tube. Then, a heater is disposed at the lower portion in the inner side of the upper guide tube. Upon a function confirmation test, the electromagnet is at first pulled up to the inside of the upper guide tube. Subsequently, the electromagnet is heated by the heater by a temperature higher than the curie point of the temperature sensing magnetic material. If the function is normal, armature connected to the control rod extension tube is separated. With such a constitution, the electromagnetic portion is isolated from a coolant main stream, thereby enabling to avoid the cooling effect by the stream of coolants. Accordingly, the operation test for confirming the integrity of the function of the curie point electromagnet can be conducted while placing the electromagnet in the reactor core as it is during actual reactor operation. (I.N.)

  19. Self operation type reactor control device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1990-01-01

    A boiling-requefication chamber containing transporting materials having somewhat higher boiling point that the usual reactor operation temperature and liquid neutron absorbers having a boiling point sufficiently higher than that of the transporting materials is disposed near the coolant exit of a fuel assembly and connected with a tubular chamber in the reactor core with a moving pipe at the bottom. Since the transporting materials in the boiling-requefication chamber is boiled and expanded by heating, the liquid neutron absorbers are introduced passing through the moving pipe into the cylindrical chamber to control the nuclear reactions. When the temperature is lowered by the control, the transporting materials are liquefied to contract the volume and the liquid neutron absorbers in the cylindrical chamber are returned passing through the moving tube into the boiling-liquefication chamber to make the nuclear reaction vigorous. Thus, self-operation type power conditioning and power stopping are enabled not by way of control rods and not requiring external control, to prevent scram failure or misoperation. (N.H.)

  20. BWR type reactor and its operating method

    International Nuclear Information System (INIS)

    Ootsuji, Niro.

    1983-01-01

    Purpose: To regulate the control rod extraction operation such that an assumed control rod drop accident, if should occur, may not lead to further serious accidents, as well as enable to improve the working life of the control rod. Method: A plurality of control rods disposed among a plurality of fuel assemblies constituting the reactor core for suppressing the reactor core reactivity are divided into two groups depending on the descending speed, and the number of rods with a faster descending speed is set to less than 1/4 of the total number of the control rods. Then, the control rods are arranged such that those rods of the faster descending speed may be set every one another in any of the vertical, lateral and orthogonal directions. Further, it is always judged as to the possibility of extracting the control rods with the faster descending speed by a fast control rod extraction judging circuit to issue a signal to a control rod extraction inhibition circuit, so that the extraction operation for the control rods with the faster descending speed is started after all of the control rods with the slow descending speed have been extracted. Accordingly, if a control rod dropping accident should occur, abrupt power change can be avoided to thereby minimize the development of the accident. (Horiuchi, T.)

  1. Organization of Control Units with Operational Addressing

    OpenAIRE

    Alexander A. Barkalov; Roman M. Babakov; Larysa A. Titarenko

    2012-01-01

    The using of operational addressing unit as the block of control unit is proposed. The new structure model of Moore finite-state machine with reduced hardware amount is developed. The generalized structure of operational addressing unit is suggested. An example of synthesis process for Moore finite-state machine with operational addressing unit is given. The analytical researches of proposed structure of control unit are executed.

  2. Regulation for installation and operation of marine reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The regulation is defined under the law for the regulations of nuclear source materials, nuclear fuel materials and reactors and the provisions of the order for execution of the law. The regulation is applied to marine reactors and reactors installed in foreign nuclear ships. Basic concepts and terms are explained, such as: radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; safeguarded area; inspected surrounding area and employee. The application for permission of installation of reactors shall list maximum continuous thermal power, location and general structure of reactor facilities, structure and equipment of reactors and treatment and storage facilities of nuclear fuel materials, etc. The application for permission of reactors installed in foreign ships shall describe specified matters according to the provisions for domestic reactors. The operation program of reactors for three years shall be filed to the Minister of Transportation for each reactor every fiscal year from that year when the operation is expected to start. Records shall be made for each reactor and kept for particular periods on inspection of reactor facilities, operation, fuel assembly, control of radiation, maintenance and others. Exposure doses, inspection and check up of reactor facilities, operation of reactors, transport and storage of nuclear fuel materials, etc. are designated in detail. (Okada, K.)

  3. Operation and maintenance of 1MW PUSPATI TRIGA reactor

    International Nuclear Information System (INIS)

    Adnan Bokhari; Mohammad Suhaimi Kassim

    2006-01-01

    The Malaysian Research Reactor, Reactor TRIGA PUSPATI (RTP) has been successfully operated for 22 years for various experiments. Since its commissioning in June 1982 until December 2004, the 1MW pool-type reactor has accumulated more than 21143 hours of operation, corresponding to cumulative thermal energy release of about 14083 MW-hours. The reactor is currently in operation and normally operates on demand, which is normally up to 6 hours a day. Presently the reactor core is made up of standard TRIAGA fuel element consists of 8.5 wt%, 12 wt% and 20 wt% types; 20%-enriched and stainless steel clad. Several measures such as routine preventive maintenance and improving the reactor support systems have been taken toward achieving this long successful operation. Besides normal routine utilization like other TRIGA reactors, new strategies are implemented for effective increase in utilization. (author)

  4. Current problems of VVER-1000 reactor core operation in Ukraine

    International Nuclear Information System (INIS)

    Bykov, A.

    2000-01-01

    Planned control rod drop time registration was passed two times a year per reactor unit. In 1992-1993 some control rods at almost all WWER-1000 units exceed the prescribed 4 second time limit. More than 7000 individual control rod time tests were made from the main correction measures. The following conclusions have been made from the current statistics data: (a) The main role of the vibration factor is proven in the fuel assembly (FA) bowing process. The greatest drop times and maximum of bowing values are concentrated at the vibration zone (2-4 FA rows from the reactor partition). The first FA row seems to be stable due to the interaction with the reactor partition; (b) Bowing relaxation will proceed during several fuel cycles (estimated value is 4-6), and depends on previous FA use history. It seems to be proven that previously bowed FAs effect the new FA, so previously bowed FAs are straightened until the middle of the fuel cycle. At some reactor units small drop time reduction is observed up to half of the fuel cycle from the start time values; (c) Control rod drop medium time (t) has almost linear dependence on operation time (τ) (t=k x τ + b]. Estimated by the method of least squares, values of k and b differ from unit to unit and from cycle to cycle. Values of k and b are in following ranges: b=2.0 - 2.6 seconds, k=5-50x10 -4 seconds per effective operation day; (d) Control rod drop time distribution changes through operation time. The position of maximum starts to shift after 240 effective days, and the form of the distribution start to change at the same time. Before 240 effective days, the distribution essentially does not change. To guarantee that the control rod system reliability is now within prescribed limits, we should continue testing. Additional analysis is needed. Test frequency can be reduced to avoid additional unreasonable transients. (authors)

  5. 78 FR 71675 - Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence

    Science.gov (United States)

    2013-11-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0260] Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence The U.S. Nuclear Regulatory Commission (NRC) is issuing this Federal Register notice to inform the public of a slight change in the manner of distribution of publicly available operating reactor licensing...

  6. The role of heat pipes in intensified unit operations

    International Nuclear Information System (INIS)

    Reay, David; Harvey, Adam

    2013-01-01

    Heat pipes are heat transfer devices that rely, most commonly, on the evaporation and condensation of a working fluid contained within them, with passive pumping of the condensate back to the evaporator. They are sometimes referred to as ‘thermal superconductors’ because of their exceptionally high effective thermal conductivity (substantially higher than any metal). This, together with several other characteristics make them attractive to a range of intensified unit operations, particularly reactors. The majority of modern computers deploy heat pipes for cooling of the CPU. The application areas of heat pipes come within a number of broad groups, each of which describes a property of the heat pipe. The ones particularly relevant to chemical reactors are: i. Separation of heat source and sink. ii. Temperature flattening, or isothermalisation. iii. Temperature control. Chemical reactors, as a heat pipe application area, highlight the benefits of the heat pipe based on isothermalisation/temperature flattening device and on being a highly effective heat transfer unit. Temperature control, done passively, is also of relevance. Heat pipe technology offers a number of potential benefits to reactor performance and operation. The aim of increased yield of high purity, high added value chemicals means less waste and higher profitability. Other intensified unit operations, such as those employing sorption processes, can also profit from heat pipe technology. This paper describes several variants of heat pipe and the opportunities for their use in intensified plant, and will give some current examples. -- Highlights: ► Heat pipes – thermal superconductors – can lead to improved chemical reactor performance. ► Isothermalisation within a reactor vessel is an ideal application. ► The variable conductance heat pipe can control reaction temperatures within close limits. ► Heat pipes can be beneficial in intensified reactors

  7. Licensed operating reactors: status summary report, data as of 6-30-81

    International Nuclear Information System (INIS)

    1981-07-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the U.S. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the U.S. energy situation as a whole

  8. Licensed operating reactors: Status summary report, data as of September 30, 1989

    International Nuclear Information System (INIS)

    1989-12-01

    THE OPERATING UNITS STATUS REPORT -- LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  9. Licensed operating reactors: Status summary report, data as of 07-31-86

    International Nuclear Information System (INIS)

    1986-12-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  10. Licensed operating reactors: Status summary report, Data as of July 31, 1987

    International Nuclear Information System (INIS)

    1987-10-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  11. Licensed operating reactors: Status summary report, data as of August 31, 1987

    International Nuclear Information System (INIS)

    1987-12-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  12. Licensed operating reactors: Status summary report, Data as of October 31, 1987

    International Nuclear Information System (INIS)

    Schwartz, I.

    1987-12-01

    The operating units status report - licensed operating reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  13. Licensed operating reactors: Status summary report, Data as of May 31, 1987

    International Nuclear Information System (INIS)

    1987-10-01

    The OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  14. Licensed operating reactors: Status summary report, Data as of June 30, 1987

    International Nuclear Information System (INIS)

    1987-07-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  15. Licensed operating reactors: Status summary report, data as of 12-31-89

    International Nuclear Information System (INIS)

    1990-02-01

    The Operating Units Status Report - Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  16. Licensed operating reactors: Status summary report, data as of 9-30-87

    International Nuclear Information System (INIS)

    1987-10-01

    The OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  17. Licensed operating reactors: Status summary report, Data as of 2-28-87

    International Nuclear Information System (INIS)

    1987-10-01

    The Operating Units Status Report- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  18. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1990-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. During 1989 the operators service staff participated in the following activities: reconstruction of the existing reactor systems, control of the emergency cooling system, construction of the experimental loop 'Vinca-1'. Education of the staff was organized through routine courses, practical training is foreseen for 1991 [sr

  19. The development of reactor operator license examination question bank

    International Nuclear Information System (INIS)

    Kim, In Hwan; Woo, S. M.; Kam, S. C.; Nam, K. J.; Lim, H. P.

    2001-12-01

    The number of NPP keeps increasing therefore there is more need of reactor operators. This trend requires the more efficiency in managing the license examination. Question bank system will help us to develop good quality examination materials and keep them in it. The ultimate purpose of the bank system is for selecting qualified reactor operators who are primarily responsible for the safety of reactor operation in NPP

  20. RA reactor operation and maintenance in 1996, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1996-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. Since the RA reactor is shutdown since 1984, it is high time for decision making of its future status. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown. Control and maintenance of the reactor instrumentation and devices was done regularly but dependent on the availability of the spare parts and financial means. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  1. RA Reactor operation and maintenance (I-IX), Part I

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling

  2. Review of tokamak power reactor and blanket designs in the United States

    International Nuclear Information System (INIS)

    Baker, C.; Brooks, J.; Ehst, D.; Gohar, Y.; Smith, D.; Sze, D.

    1986-01-01

    The last major conceptual design study of a tokamak power reactor in the United States was STARFIRE which was carried out in 1979-1980. Since that time US studies have concentrated on engineering test reactors, demonstration reactors, parametric systems studies, scoping studies, and studies of selected critical issues such as pulsed vs. steady-state operation and blanket requirements. During this period, there have been many advancements in tokamak physics and reactor technology, and there has also been a recognition that it is desirable to improve the tokamak concept as a commercial power reactor candidate. During 1984-1985 several organizations participated in the Tokamak Power Systems Study (TPSS) with the objective of developing ideas for improving the tokamak as a power reactor. Also, the US completed a comprehensive Blanket Comparison and Selection Study which formed the basis for further studies on improved blankets for fusion reactors

  3. Operation management of the prototype heavy water reactor 'Fugen'

    International Nuclear Information System (INIS)

    Muramatsu, Akira; Takei, Hiroaki; Iwanaga, Shigeru; Noda, Masao; Hara, Hidemi

    1983-01-01

    The advanced thermal reactor Fugen power station has continued almost smooth operation since it began the full scale operation as the first homemade power reactor in Japan in March, 1979. In the initial period of operation, some troubles were experienced, but now, it can be said that the operational techniques of heavy water-moderated, boiling light water-cooled, pressure tube type reactors have been established, through the improvement of the operational method and equipment, and the operational experience. Also, the verification of the operational ability, maintainability, reliability and safety of this new type reactor, that is the mission of the prototype reactor, achieved steadily the good results. Hereafter, the verification of operational performance is the main objective because it is required for the design, construction and operation of the demonstration reactor. The organization for the operation management and operation, the communication at the time of the abnormality, the operation of the plant, that is, start up, stop and the operation at the rated output, the works during plant stoppage, the operation at the time of the plant abnormality, the operation of waste treatment facility and others, the improvement of the operational method, and the education and training of operators are reported. (Kako, I.)

  4. A series of lectures on operational physics of power reactors

    International Nuclear Information System (INIS)

    Mohanakrishnan, P.; Rastogi, B.P.

    1982-01-01

    This report discusses certain aspects of operational physics of power reactors. These form a lecture series at the Winter College on Nuclear Physics and Reactors, Jan. - March 1980, conducted at the International Centre for Theoretical Physics, Trieste, Italy. The topics covered are (a) the reactor physics aspects of fuel burnup (b) theoretical methods applied for burnup prediction in power reactors (c) interpretation of neutron detector readings in terms of adjacent fuel assembly powers (d) refuelling schemes used in power reactors. The reactor types chosen for the discussion are BWR, PWR and PHWR. (author)

  5. EDF view on next generation reactor safety and operability issues

    International Nuclear Information System (INIS)

    Serviere, G.

    2002-01-01

    In the foreseeable future, EDF will have to compete in an economically de-regulated market. Nuclear currently accounts for more than 80% of the electricity generated by the company, and generation costs are quite competitive compared to that of other competing energies. It is so likely that nuclear units will remain the backbone of EDF generating fleet in the years to come. However, to remain a viable option for electricity generation in the longer term, nuclear will have to maintain both its cost-effectiveness and a very high safety level. This could seem quite straightforward considering the current situation where safety records are at an all time high and Operating and Maintenance costs are under tight control. In fact, it could be a real challenge. Competing fossil technologies progress and there is a concurrent trend to try and improve the performance of future nuclear units. However, in most cases, proposed designs depart from the well-known Light Water Reactor (LWR) technology. They are either new concepts or designs already tested in the past and modified to address some of their perceived drawbacks. Contrary to the prevailing situation where short-term alternatives like the EPR, the ABWR or the AP600 largely build upon experience gathered on operating units, most designs contemplated for implementation beyond 2020 or 2030 cannot be considered proven. Considering the above mentioned uncertainties, EDF have confirmed their preference for proven designs with higher outputs, such as the EPR. However, it would appear unreasonable to consider that new designs are doomed to fail: they could well turn out to be adequate for specific niches in a de-regulated market and provide reasonable alternatives for the utility. Nevertheless, for such an alternative to be considered, additional evidence is needed that utility preferences are reflected in the design, and that all potential technical issues have been identified, adequately addressed and resolved. Currently, EDF

  6. Regulation for installation and operation of experimental-research reactor

    International Nuclear Information System (INIS)

    1979-01-01

    The ordinance is stipulated under the Law for regulation of nuclear raw materials, nuclear fuel materials and reactors and the provisions for installation and operation of reactor in the order for execution of the law. Basic concepts and terms are defined, such as, radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; preserved area; inspected surrounding area and employee. An application for permission of installation of reactor shall list such matters as: the maximum continuous thermal output of reactor; location and general construction of reactor facilities; construction and equipment of the main reactor and other facilities for nuclear fuel materials; cooling and controlling system and radioactive waste, etc. An operation plan of reactor for three years shall be filed till January 31 of the fiscal year preceding that one the operation begins. Records shall be made and kept for specified periods respectively on inspection of reactor facilities, operation, fuel assembly, radiation control, maintenance, accidents of reactor equipment and weather. Detailed rules are settled for entrance limitation to controlled area, exposure dose, inspection, check up and regular independent examination of reactor facilities, operation of reactor, transportation of substances contaminated by nuclear fuel materials within the works and storage, etc. (Okada, K.)

  7. Operability design review of prototype large breeder reactor (PLBR) designs. Final report, September 1981

    International Nuclear Information System (INIS)

    Beakes, J.H.; Ehman, J.R.; Jones, H.M.; Kinne, B.V.T.; Price, C.M.; Shores, S.P.; Welch, J.K.

    1981-09-01

    Prototype Large Breeder Reactor (PLBR) designs were reviewed by personnel with extensive power plant operations experience. Fourteen normal and off-normal events, such as startup, shutdown, refueling, reactor scram and loss of feedwater, were evaluated using an operational evaluation methodology which is designed to facilitate talk-through sessions on operational events. Human factors engineers participated in the review and assisted in developing and refining the review methodologies. Operating experience at breeder reactor facilities such as Experimental Breeder Reactor-II (EBR-II), Enrico Fermi Atomic Power Plant - Unit 1, and the Fast Flux Test Facility (FFTF) was gathered, analyzed, and used to determine whether lessons learned from operational experience had been incorporated into the PLBR designs. This eighteen month effort resulted in approximately one hundred specific recommendations for improving the operability of PLBR designs

  8. Theory, design, and operation of liquid metal fast breeder reactors, including operational health physics

    International Nuclear Information System (INIS)

    Adams, S.R.

    1985-10-01

    A comprehensive evaluation was conducted of the radiation protection practices and programs at prototype LMFBRs with long operational experience. Installations evaluated were the Fast Flux Test Facility (FFTF), Richland, Washington; Experimental Breeder Reactor II (EBR-II), Idaho Falls, Idaho; Prototype Fast Reactor (PFR) Dounreay, Scotland; Phenix, Marcoule, France; and Kompakte Natriumgekuhlte Kernreak Toranlange (KNK II), Karlsruhe, Federal Republic of Germany. The evaluation included external and internal exposure control, respiratory protection procedures, radiation surveillance practices, radioactive waste management, and engineering controls for confining radiation contamination. The theory, design, and operating experience at LMFBRs is described. Aspects of LMFBR health physics different from the LWR experience in the United States are identified. Suggestions are made for modifications to the NRC Standard Review Plan based on the differences

  9. Theory, design, and operation of liquid metal fast breeder reactors, including operational health physics

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.R.

    1985-10-01

    A comprehensive evaluation was conducted of the radiation protection practices and programs at prototype LMFBRs with long operational experience. Installations evaluated were the Fast Flux Test Facility (FFTF), Richland, Washington; Experimental Breeder Reactor II (EBR-II), Idaho Falls, Idaho; Prototype Fast Reactor (PFR) Dounreay, Scotland; Phenix, Marcoule, France; and Kompakte Natriumgekuhlte Kernreak Toranlange (KNK II), Karlsruhe, Federal Republic of Germany. The evaluation included external and internal exposure control, respiratory protection procedures, radiation surveillance practices, radioactive waste management, and engineering controls for confining radiation contamination. The theory, design, and operating experience at LMFBRs is described. Aspects of LMFBR health physics different from the LWR experience in the United States are identified. Suggestions are made for modifications to the NRC Standard Review Plan based on the differences.

  10. Licensed operating reactors: Status summary report data as of June 30, 1988

    International Nuclear Information System (INIS)

    1988-07-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  11. Licensed operating reactors: Status summary report: Data as of February 29, 1988

    International Nuclear Information System (INIS)

    1988-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  12. Licensed operating reactors. Status summary report, data as of April 30, 1982

    International Nuclear Information System (INIS)

    1982-05-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  13. Licensed operating reactors. Status summary report as of February 29, 1984. Volume 8, No. 3

    International Nuclear Information System (INIS)

    1984-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement (IE), from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  14. Licensed operating reactors. Status summary report: data as of September 30, 1985. Volume 9, No. 10

    International Nuclear Information System (INIS)

    1985-11-01

    This report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  15. Licensed operating reactors. Status summary report data as of May 31, 1985. Vol. 9, No. 6

    International Nuclear Information System (INIS)

    1985-07-01

    This report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management from the Headquarters staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, IE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  16. Licensed operating reactors: Status summary report, Data as of 12-31-86

    International Nuclear Information System (INIS)

    1987-09-01

    This report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are monthly highlights and statistics for commercial operating units and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  17. Regulations for RA reactor operation; Propisi nuklearnog reaktora 'RA'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-09-15

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions. [Serbo-Croat] Propisi o radu nuklearnog reaktora RA pisani su tako da svi zakonski propisi definisani 'Zakonom o zastiti od jonizujuceg zracenja' i pratecim propisima (devet pravilnika) kao i tehnicke norme prema preporukama MAAE budu postovani u punoj meri pri radu reaktora. Sadrzaj ove knjige obuhvata: osnovne podatke o reaktoru; zakonske propise; organizaciju rada reaktora RA; opste propise o rezimu rada, kretanju u zgradi reaktora, izvodjenju eksperimenata; pogonske propise za rad u normalnom rezimu i u slucaju udesa.

  18. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  19. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  20. Fast reactor parameter optimization taking into account changes in fuel charge type during reactor operation time

    International Nuclear Information System (INIS)

    Afrin, B.A.; Rechnov, A.V.; Usynin, G.B.

    1987-01-01

    The formulation and solution of optimization problem for parameters determining the layout of the central part of sodium cooled power reactor taking into account possible changes in fuel charge type during reactor operation time are performed. The losses under change of fuel composition type for two reactor modifications providing for minimum doubling time for oxide and carbide fuels respectively, are estimated

  1. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  2. General areas needing chemical competence to support reactor operation

    International Nuclear Information System (INIS)

    Proksch, E.; Bildstein, H.

    1963-01-01

    Chemical competence is needed not only for the development of new types of reactors but also for the start-up and safe operation of reactors. The activities of chemistry and chemical engineering cover a number of fields, namely chemical analysis, radiochemical analysis, corrosion research, radiolysis of water and water purification. The author reviews fields in reactor operation and maintenance in which chemical competence is needed. (author). 9 refs

  3. Compilation of data and descriptions for United States and foreign liquid metal fast breeder reactors

    International Nuclear Information System (INIS)

    Appleby, E.R.

    1975-08-01

    This document is a compilation of design and engineering information pertaining to liquid metal cooled fast breeder reactors which have operated, are operating, or are currently under construction, in the United States and abroad. All data has been taken from publicly available documents, journals, and books

  4. International Experience with Fast Reactor Operation & Testing

    International Nuclear Information System (INIS)

    Sackett, John I.; Grandy, C.

    2013-01-01

    Conclusion: • Worldwide experience with fast reactors has demonstrated the robustness of the technology and it stands ready for worldwide deployment. • The lessons learned are many and there is danger that what has been learned will be forgotten given that there is little activity in fast reactor development at the present time. • For this reason it is essential that knowledge of fast reactor technology be preserved, an activity supported in the U.S. as well as other countries

  5. Neutron field control cybernetics model of RBMK reactor operator

    International Nuclear Information System (INIS)

    Polyakov, V.V.; Postnikov, V.V.; Sviridenkov, A.N.

    1992-01-01

    Results on parameter optimization for cybernetics model of RBMK reactor operator by power release control function are presented. Convolutions of various criteria applied previously in algorithms of the program 'Adviser to reactor operator' formed the basis of the model. 7 refs.; 4 figs

  6. Strategies of operation cycles in BWR type reactors

    International Nuclear Information System (INIS)

    Molina, D.; Sendino, F.

    1996-01-01

    The article analyzes the operation cycles in BWR type reactors. The cycle size of operation is the consequence on the optimization process of the costs with the technical characteristics of nuclear fuel and the characteristics of demand and production. The authors analyze the cases of Garona NP and Cofrentes NP, both with BWR reactors. (Author)

  7. Benchmarking burnup reconstruction methods for dynamically operated research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Sternat, Matthew R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Charlton, William S. [Univ. of Nebraska, Lincoln, NE (United States). National Strategic Research Institute; Nichols, Theodore F. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2016-03-01

    The burnup of an HEU fueled dynamically operated research reactor, the Oak Ridge Research Reactor, was experimentally reconstructed using two different analytic methodologies and a suite of signature isotopes to evaluate techniques for estimating burnup for research reactor fuel. The methods studied include using individual signature isotopes and the complete mass spectrometry spectrum to recover the sample’s burnup. The individual, or sets of, isotopes include 148Nd, 137Cs+137Ba, 139La, and 145Nd+146Nd. The storage documentation from the analyzed fuel material provided two different measures of burnup: burnup percentage and the total power generated from the assembly in MWd. When normalized to conventional units, these two references differed by 7.8% (395.42GWd/MTHM and 426.27GWd/MTHM) in the resulting burnup for the spent fuel element used in the benchmark. Among all methods being evaluated, the results were within 11.3% of either reference burnup. The results were mixed in closeness to both reference burnups; however, consistent results were achieved from all three experimental samples.

  8. LBB application in the US operating and advanced reactors

    Energy Technology Data Exchange (ETDEWEB)

    Wichman, K.; Tsao, J.; Mayfield, M.

    1997-04-01

    The regulatory application of leak before break (LBB) for operating and advanced reactors in the U.S. is described. The U.S. Nuclear Regulatory Commission (NRC) has approved the application of LBB for six piping systems in operating reactors: reactor coolant system primary loop piping, pressurizer surge, safety injection accumulator, residual heat removal, safety injection, and reactor coolant loop bypass. The LBB concept has also been applied in the design of advanced light water reactors. LBB applications, and regulatory considerations, for pressurized water reactors and advanced light water reactors are summarized in this paper. Technology development for LBB performed by the NRC and the International Piping Integrity Research Group is also briefly summarized.

  9. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    International Nuclear Information System (INIS)

    Kim, Man Cheol

    2014-01-01

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated

  10. Analysis on Isolation Condenser Operation by Fukushima Daiichi Unit 1 Operators

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Man Cheol [Chungang University, Seoul (Korea, Republic of)

    2014-08-15

    Fukushima Daiichi nuclear accident resulted in the core damage in three reactors and the release of considerable amount of radioactive material to the environment, not to mention significant social impact and anti-nuclear atmosphere all around the world. This paper provides a review of the findings related to shift operators' operation of the isolation condenser in Unit 1 to examine shift operators' response to the situation. Based on the review of the findings, a situation assessment model was developed to analyze shift operators' understanding on whether core cooling was successfully performed in Unit 1 through the operation of isolation condenser. It was found that lack of information could be one of the main causes for the failure in core cooling by the IC in Unit 1. It is also recommended that the differences in the mathematical model for the situation assessment and that of the real operator need to be further investigated.

  11. Proposed Reactor Operating Experience Feedback System Development

    International Nuclear Information System (INIS)

    Ahn, Seung Hoon; Kim, Min Chul; Huh, Chang Wook; Lee, Durk Hun; Bae, Koo Hyun

    2006-01-01

    Most events occurring in nuclear power plants are not individually significant, and prevented from progressing to accident conditions by a series of barriers against core damage and radioactive releases. Significant events, if occur, are almost always a breach of these multiple barriers. As illustrated in the 'Swiss cheese' model, the individual layers of defense or 'cheese slices' have weakness or 'holes.' These weaknesses are inconstant, i.e., the holes are open or close at random. When by chance all the holes are aligned, a hazard causes the significant event of concern. Elements of low significant events, inattention to detail, time or economic pressure, uncorrected poor practices/habits, marginal maintenance and equipment care, etc., make holes in the layers of defense; some elements may make more holes in different layers, incurring more chances to be aligned. An effective reduction of the holes, therefore, is gained through better knowledge or awareness of increasing trends of the event elements, followed by appropriate actions. According to the Swiss cheese metaphor, attention to the Operating Experience (OE) feedback system, as opposed to the individual and to randomness, is drawn from a viewpoint of reactor safety

  12. Mathematical modeling of a fast-breeder-reactor generating unit

    International Nuclear Information System (INIS)

    Kim, V.E.; Golovach, E.A.; Senkin, V.I.

    1984-01-01

    Dynamics equations are given for a reactor, intermediate heat exchanger, steam generator, and turbogenerator. The dynamic characteristics of the generating unit are described when perturbations occur in grid frequency, turbine valves, and feedwater consumption

  13. Regulation for installation and operation of reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Concerning the description of an application for the approval of installation of a reactor, stipulated in Article 23 paragraph 2 of the Law for Regulation of Nuclear Source Materials, Nuclear Fuel Materials and Reactors (hereinafter referred to as the Law), the following items must be written. Namely, the heat output of the reactor in Article 23 paragraph 2 item 3 of the Law, the position, structure and facilities of the reactor facilities, described according to the stipulated classifications, the work plan, nuclear fuel materials employed, and the disposal of spent fuel. Concerning an application for the approval of a reactor installed aboard a foreign ship, stipulations are made separately. Description of an application for the approval of change of the heat output of a reactor and others should include the stipulated items. When it is wished to undergo inspection of the construction and performance of reactor facilities, an application for that end including the required items should be filed. Various safety measures preventing personnel from being exposed to radiation should be taken. When a foreign atomic-powered ship tries to enter a Japanese port, the stipulated necessary informations should be reported 60 days before such ship actually enters the Japanese port. A chief technician of reactors should take and pass the official examination. (Rikitake, Y.)

  14. RA reactor operation and maintenance in 1994, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1994-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  15. Fast reactor operating experience gained in Russia: Analysis of anomalies and abnormal operation cases

    International Nuclear Information System (INIS)

    Ashurko, Y.M.; Baklushin, R.P.; Zagorulko, Y.I.; Ivanenko, V.N.; Matveyev, V.P.; Vasilyev, B.A.

    2000-01-01

    Review of various anomalous events and abnormal operation experience gained in the process of Russian fast reactors operation is given in the paper. The main information refers to the BN-600 demonstration reactor operation. Statistical data on sodium leaks and steam generator failures are presented, and sources of these events and countermeasures taken to avoid their appearance on the operating reactors as well as related changes made in the BN-800 reactor design are considered. In the paper, some features of impurities behaviour are considered in various modes of the BN-600 reactor operation. Information is given on the impurities ingress into the circuits, on abnormal situation emerged in the process of the BN-600 reactor operation and its probable cause. Information is presented on the event related to the increased torque of the BN-600 reactor central rotating column and repair works performed. (author)

  16. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex A - Reactor applications

    International Nuclear Information System (INIS)

    Martinc, R.; Stanic, A.

    1985-01-01

    This document describes reactor operation from 1981 to 1985, including data about short term (shorter than 24 hours) and long term operation interruptions, as well as safety shutdown and reactor applications. During 1982, 1983 until July 1984 reactor was operated at 2 MW power according to the plan. Plan was not fulfilled in 1983 because deposits were noticed again, at the end of 1982, on the surface of fuel elements. Reactor was mainly used for neutron activation purposes and isotope production as source of neutrons for experimental purposes [sr

  17. Radiological monitoring related to the operation of PUSPATI's Triga Reactor

    International Nuclear Information System (INIS)

    Fatimah Mohamad Amin; Mohamad Yusof Mohamad Ali; Lau How Mooi; Idris Besar.

    1983-01-01

    Reactor operation is one of the main activities carried out at the Tun Ismail Atomic Research Centre (PUSPATI) which requires radiological monitoring. This paper describes the programme for radiological monitoring which is related to the operation of the 1 MW Triga MK II research reactor which was commissioned in July, 1982. This programme includes monitoring of the radiation and contamination levels of the reactor and its associated facilities and environmental monitoring of PUSPATI's site and its environs. The data presented in this paper covers the period between 1982 to 1983 which includes both the pre-operational and operational phases of the monitoring programme. (author)

  18. Physical protection of nuclear operational units

    International Nuclear Information System (INIS)

    1981-07-01

    The general principles of and basic requirements for the physical protection of operational units in the nuclear field are established. They concern the operational units whose activities are related with production, utilization, processing, reprocessing, handling, transport or storage of materials of interest for the Brazilian Nuclear Program. (I.C.R.) [pt

  19. Annual report 1989 operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1989-01-01

    In 1989 the operation of the High Flux Reactor Petten was carried out as planned. The availability was more than 100% of scheduled operating time. The average occupation of the reactor by experimental devices was 72% of the practical occupation limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons and for radioisotope production. General activities in support of running irradiation programmes progressed in the normal way. Development activities addressed upgrading of irradiation devices, neutron radiography and neutron capture therapy

  20. BEACON TSM application system to the operation of PWR reactors

    International Nuclear Information System (INIS)

    Lozano, J. A.; Mildrum, C.; Serrano, J. F.

    2012-01-01

    BEACON-TSM is an advanced core monitoring system for PWR reactor cores, and also offers the possibility to perform a wide range of predictive calculation in support of reactor operation. BEACON-TSM is presently installed and licensed in the 5 Spanish PWR reactors of standard Westinghouse design. the purpose of this paper is to describe the features of this software system and to show the advantages obtainable by a nuclear power plant from its use. To illustrate the capabilities and benefits of BEACON-TSM two real case reactor operating situations are presented. (Author)

  1. Annual report 1990. Operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1990-01-01

    In 1990 the operation of the High Flux Reactor was carried out as planned. The availability was 96% of scheduled operating time. The average utilization of the reactor was 71% of the practical limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons, for radioisotope production, and for various smaller activities. General activities in support of running irradiation programmes progressed in the normal way. Development activities addressed upgrading of irradiation devices, neutron radiography and neutron capture therapy

  2. Annual Report 1991. Operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1992-01-01

    In 1991 the operation of the High Flux Reactor was carried out as planned. The availability was more than 100% of scheduled operating time. The average utilization of the reactor was 69% of the practical limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons, for radioisotope production, and for various smaller activities. Development activities addressed upgrading of irradiation devices, neutron capture therapy, neutron radiography and neutron transmutation doping of silicon. General activities in support of running irradiation programmes progressed in the normal way

  3. Operating experience with the DRAGON High Temperature Reactor experiment

    International Nuclear Information System (INIS)

    Simon, R.A.; Capp, P.D.

    2002-01-01

    The Dragon Reactor Experiment in Winfrith/UK was a materials test facility for a number of HTR projects pursued in the sixties and seventies of the last century. It was built and managed as an OECD/NEA international joint undertaking. The reactor operated successfully between 1964 and 1975 to satisfy the growing demand for irradiation testing of fuels and fuel elements as well as for technological tests of components and materials. The paper describes the reactor's main experimental features and presents results of 11 years of reactor operation relevant for future HTRs. (author)

  4. Temelin-1 reactor unit commissioning and start-up

    International Nuclear Information System (INIS)

    Palecek, K.

    2002-01-01

    The Temelin-1 commissioning process was affected substantially by the change in the Czech political situation in 1989. The effects thereof were both favourable and unfavourable. Among favourable effects are the replacement of the original Instrumentation and Control System by a more advanced system and design changes which have brought about additional improvement of the Temelin NPP design safety, although on the other hand, this had an adverse impact on the time span and price of the power plant construction. Additional adverse effects included an unstable political and economic situation, associated with frequent changes in the management of the utility CEZ, a.s. (owner of the plant) as well as frequent replacement of persons in the position of the managing director of the Temelin plant itself. Despite all the difficulties encountered, Temelin-1 reactor unit could be ultimately put into trial operation in June 2002. (author)

  5. Nuclear safety requirements for operation licensing of Egyptian research reactors

    International Nuclear Information System (INIS)

    Ahmed, E.E.M.; Rahman, F.A.

    2000-01-01

    From the view of responsibility for health and nuclear safety, this work creates a framework for the application of nuclear regulatory rules to ensure safe operation for the sake of obtaining or maintaining operation licensing for nuclear research reactors. It has been performed according to the recommendations of the IAEA for research reactor safety regulations which clearly states that the scope of the application should include all research reactors being designed, constructed, commissioned, operated, modified or decommissioned. From that concept, the present work establishes a model structure and a computer logic program for a regulatory licensing system (RLS code). It applies both the regulatory inspection and enforcement regulatory rules on the different licensing process stages. The present established RLS code is then applied to the Egyptian Research Reactors, namely; the first ET-RR-1, which was constructed and still operating since 1961, and the second MPR research reactor (ET-RR-2) which is now in the preliminary operation stage. The results showed that for the ET-RR-1 reactor, all operational activities, including maintenance, in-service inspection, renewal, modification and experiments should meet the appropriate regulatory compliance action program. Also, the results showed that for the new MPR research reactor (ET-RR-2), all commissioning and operational stages should also meet the regulatory inspection and enforcement action program of the operational licensing safety requirements. (author)

  6. Operators of nuclear reactors. A study about their professional identity

    International Nuclear Information System (INIS)

    Valente, Paula Mercedes Becker

    1997-01-01

    This research studies the process of identity formation/transformation in a group of workers at a Research Institute, which deals with nuclear energy for peaceful uses. It had as a referential the work developed by Antonio da Costa Ciampa (1995). This approach conceives identity as metamorphosis and it is empirically expressed by characters. The research was candied out at the IPEN-CNEN/SP with the oldest reactor operators at work, with open interviews mainly. At the end of the analysis, it was observed that the team, in spite of its grievance and complaints, is still united and operates the reactor with great responsibility. This fact can be proved since no accidents have happened in the last forty years. Nevertheless, the group misses the community recognition for the importance of its work. This was interpreted as the search for an emancipatory feeling towards the development of a collective identity. The lack of this feeling tends to produce an identity with a mere instrumental rationality, suggesting that the organization identity policy must be reviewed. (author)

  7. Spring unit especially intended for a nuclear reactor core

    International Nuclear Information System (INIS)

    Brown, S.J.; Gorholt, Wilhelm.

    1977-01-01

    This invention relates to a spring unit or a group of springs bearing up a sprung mass against an unsprung mass. For instance, a gas cooled high temperature nuclear reactor includes a core of relatively complex structure supported inside a casing or vessel forming a shielded cavity enclosing the reactor core. This core can be assembled from a large number of graphite blocks of different sizes and shapes joined together to form a column. The blocks of each column can be fixed together so as to form together a loose side support. Under the effect of thermal expansion and contraction, shrinkage resulting from irradiation, the effects of pressure and the contraction and creep of the reactor vessel, it is not possible to confine all the columns of the reactor core in a cylindrical rigid structure. Further, the working of the nuclear reactor requires that the reactivity monitoring components may be inserted at any time in the reactor core. A standard process consists in mounting this loosely assembled reactor core in a floating manner by keeping it away from the vessel enclosure around it by means of a number of springs fitted between the lateral surfaces of the core unit and the reactor vessel. The core may be considered as a spring supported mass whereas, relatively, the reactor vessel is a mass that is not flexibly supported [fr

  8. Massive computation methodology for reactor operation (MACRO)

    International Nuclear Information System (INIS)

    Gustavsson, Cecilia; Pomp, Stephan; Sjoestrand, Henrik; Wallin, Gustav; Oesterlund, Michael; Koning, Arjan; Rochman, Dimitri; Bejmer, Klaes-Hakan; Henriksson, Hans

    2010-01-01

    Today, nuclear data libraries do not handle uncertainties from nuclear data in a consistent manner and the reactor codes do not request uncertainties in nuclear data input. Thus, the output from these codes have unknown uncertainties. The plan is to use a method proposed by Koning and Rochman to investigate the propagation of nuclear data uncertainties into reactor physics codes and macroscopic parameters. A project (acronym MACRO) has started at Uppsala University in collaboration with A. Koning and with financial support from Vattenfall AB and the Swedish Research Council within the GENIUS (Generation IV research in universities of Sweden) project. In the proposed method the uncertainties in nuclear model parameters will be derived from theoretical considerations and comparisons of nuclear model results with experimental cross-section data. Given the probability distribution in the model parameters a large set of random, complete ENDF-formatted nuclear data libraries will be created using the TALYS code. The generated nuclear data libraries will then be used in neutron transport codes to obtain macroscopic reactor parameters. For this, models of reactor systems with proper geometry and elements will be used. This will be done for all data libraries and the variation of the final results will be regarded as a systematic uncertainty in the investigated reactor parameter. The understanding of these systematic uncertainties is especially important for the design and intercomparison of new reactor concepts, i.e., Generation IV, and optimization applications for current generation reactors is envisaged. (authors)

  9. Massive computation methodology for reactor operation (MACRO)

    Energy Technology Data Exchange (ETDEWEB)

    Gustavsson, Cecilia; Pomp, Stephan; Sjoestrand, Henrik; Wallin, Gustav; Oesterlund, Michael [Division of applied nuclear physics, Department of physics and astronomy, Uppsala University, Laegerhyddsvaegen 1, 751 20 Uppsala (Sweden); Koning, Arjan; Rochman, Dimitri [Nuclear Research and consultancy Group (NRG) Westerduinweg 3, Petten (Netherlands); Bejmer, Klaes-Hakan [Vattenfall Nuclear Fuel AB, Jaemtlandsgatan 99, Vaellingby (Sweden); Henriksson, Hans [Vattenfall Research and Development AB, Jaemtlandsgatan 99, Vaellingby (Sweden)

    2010-07-01

    Today, nuclear data libraries do not handle uncertainties from nuclear data in a consistent manner and the reactor codes do not request uncertainties in nuclear data input. Thus, the output from these codes have unknown uncertainties. The plan is to use a method proposed by Koning and Rochman to investigate the propagation of nuclear data uncertainties into reactor physics codes and macroscopic parameters. A project (acronym MACRO) has started at Uppsala University in collaboration with A. Koning and with financial support from Vattenfall AB and the Swedish Research Council within the GENIUS (Generation IV research in universities of Sweden) project. In the proposed method the uncertainties in nuclear model parameters will be derived from theoretical considerations and comparisons of nuclear model results with experimental cross-section data. Given the probability distribution in the model parameters a large set of random, complete ENDF-formatted nuclear data libraries will be created using the TALYS code. The generated nuclear data libraries will then be used in neutron transport codes to obtain macroscopic reactor parameters. For this, models of reactor systems with proper geometry and elements will be used. This will be done for all data libraries and the variation of the final results will be regarded as a systematic uncertainty in the investigated reactor parameter. The understanding of these systematic uncertainties is especially important for the design and intercomparison of new reactor concepts, i.e., Generation IV, and optimization applications for current generation reactors is envisaged. (authors)

  10. Junior Leader Training Development in Operational Units

    Science.gov (United States)

    2012-04-01

    UNITS Successful operational units do not arise without tough, realistic, and challenging training. Field Manual (FM) 7-0, Training Units and D...operations. The manual provides junior leaders with guidance on how to conduct training and training management. Of particular importance is the definition...1 Relation htp between ADDIE and the Anny Training Management Model. The Army Training Management Model and ADDIE process appear in TRADOC PAM 350

  11. Salem Nuclear Generating Station, Unit 1. Annual operating report for 1976

    International Nuclear Information System (INIS)

    1977-01-01

    Initial reactor criticality was achieved 12/11/76 and power generation began 12/25/76. Information is presented concerning operation, maintenance, procedure and specification changes, power generation, unit shutdowns and forced power reductions, testing, and personnel radiation exposures

  12. Small nuclear reactor safety design requirements for autonomous operation

    International Nuclear Information System (INIS)

    Kozier, K.S.; Kupca, S.

    1997-01-01

    Small nuclear power reactors offer compelling safety advantages in terms of the limited consequences that can arise from major accident events and the enhanced ability to use reliable, passive means to eliminate their occurrence by design. Accordingly, for some small reactor designs featuring a high degree of safety autonomy, it may be-possible to delineate a ''safety envelope'' for a given set of reactor circumstances within which safe reactor operation can be guaranteed without outside intervention for time periods of practical significance (i.e., days or weeks). The capability to operate a small reactor without the need for highly skilled technical staff permanently present, but with continuous remote monitoring, would aid the economic case for small reactors, simplify their use in remote regions and enhance safety by limiting the potential for accidents initiated by inappropriate operator action. This paper considers some of the technical design options and issues associated with the use of small power reactors in an autonomous mode for limited periods. The focus is on systems that are suitable for a variety of applications, producing steam for electricity generation, district heating, water desalination and/or marine propulsion. Near-term prospects at low power levels favour the use of pressurized, light-water-cooled reactor designs, among which those having an integral core arrangement appear to offer cost and passive-safety advantages. Small integral pressurized water reactors have been studied in many countries, including the test operation of prototype systems. (author)

  13. Operating manual for the Health Physics Research Reactor

    International Nuclear Information System (INIS)

    1985-11-01

    This manual is intended to serve as a guide in the operation and maintenance of the Health Physics Researh Reactor (HPRR) of the Health Physics Dosimetry Applications Research (DOSAR) Facility. It includes descriptions of the HPRR and of associated equipment such as the reactor positioning devises and the derrick. Procedures for routine operation of the HPRR are given in detail, and checklists for the various steps are provided where applicable. Emergency procedures are similarly covered, and maintenance schedules are outlined. Also, a bibliography of references giving more detailed information on the DOSAR Facility is included. Changes to this manual will be approved by at least two of the following senior staff members: (1) the Operations Division Director, (2) the Reactor Operations Department Head, (3) the Supervisor of Reactor Operations TSF-HPRR Areas. The master copy and the copy of the manual issued to the HPRR Operations Supervisor will always reflect the latest revision. 22 figs

  14. The application of modern safety criteria to restarting and operating the USDOE K-Reactor

    International Nuclear Information System (INIS)

    Dimenna, R.A.; Taylor, G.A.; Brandyberry, M.D.

    1993-01-01

    The United States Department of Energy's (USDOE's) K-reactor, a defense production reactor located at the Savannah River Site in Aiken, South Carolina, was shut down in the summer of 1988 for safety upgrades to bring it into conformance with modern safety standards prior to restart. Over the course of the succeeding four years, all aspects of the 35-year old reactor, including hardware, operations, and analysis, were upgraded to ensure that the reactor could operate safely according to standards similar to those applied to modern nuclear reactors. This paper describes the decision making processes by which issues were identified, priorities assigned, and analysis improved to enhance reactor safety. Special emphasis is given to the probabilistic risk assessment (PRA) decision making processes used to quantify the risks and consequences of operating the K-reactor, the analytical hierarchy process (AHP) used to identify key phenomena, and modifications made to the RELAP5 computer code to make it applicable to K-reactor analysis. The success of the project was demonstrated when the K-reactor was restarted in the summer of 1992

  15. To report the obtained results in the simulation with the FCS-11 and Presto codes of the two first operation cycles of the Laguna Verde Unit 1 reactor; Reportar los resultados obtenidos en la simulacion con los codigos FCS-11 y PRESTO de los dos primeros ciclos de operacion del reactor Laguna Verde Unidad 1

    Energy Technology Data Exchange (ETDEWEB)

    Montes T, J.L.; Moran L, J.M.; Cortes C, C.C

    1990-08-15

    The objective of this work is to establish a preliminary methodology to carry out analysis of recharges for the reactor of the Laguna Verde U-1, by means of the evaluation of the state of the reactor core in its first two operation cycles using the FCS2 and Presto-B codes. (Author)

  16. PCI. Mechanism, measures, rules for reactor operation

    International Nuclear Information System (INIS)

    Bender, D.; Bender, G.; Dewes, P.; Wensauer, A.

    2009-01-01

    Though modern and advanced fuel assembly designs for BWR as AREVA's ATRIUM trademark 10 fuel assemblies show a high reliability, fuel failures are still encountered. The ZTF (Zero Tolerance for Failures) initiative was launched by AREVA to further upgrade BWR fuel assembly reliability towards failure free fuel. The introduction of the zirconium liner cladding has greatly reduced pellet cladding interaction (PCI) failures. However the phenomenon of PCI in reactor operation was not completely eliminated. There were failures in AREVA's BWR fuel with liner cladding attributed to PCI, but when subject to hot cell examinations, all these have been attributed to ''non-classical'' PCI, where local cladding stress is amplified due to missing pellet surface (MPS). However, in order to support the efforts to eliminate all possible root causes for fuel failures, AREVA NP addresses PCI with a ''multi-track'' strategy. First, and most important, the development of chromia doped pellets and more favorable pellet geometries aim at fuel that by design is protected as much as possible against PCI. A high pellet quality is further assured by the final assessment of the pellet appearance by an automatic visual inspection system in the pellet manufacturing lines. In order to support these hardware improvements, AREVA NP provides software aimed to minimize PCI risks. Two main approaches are described in this paper: - The ''classical'' PCI operation and maneuvering guidelines restrict power maneuvering and limit the ramping rates with the goal to control the stress level of the cladding. AREVA's guidelines are based on ramp tests as well as on extensive power plant experience, and are updated to reflect the performance of liner cladding. - Additional effort is made to further understand the PCI phenomenon, e.g. by the use of detailed fuel rod thermal-mechanical codes that provide far better insight of the state variables that control the process of rupture due to stress corrosion

  17. Initial startup and operations of Yonggwang Units 3 and 4

    International Nuclear Information System (INIS)

    Collier, T.J.; Chari, D.R.; Kiraly, F.

    1996-01-01

    A significant milestone in the nuclear power industry was achieved in 1995, when Yonggwang (YGN) Units 3 and 4 were accepted into in commercial operation by Korea Electric Power Corporation (KEPCO). YGN Unit 3 was accepted into commercial operation on March 31, 1995, the original date established during project initiation. YGN Unit 4 was accepted into operation on January 1, 1996, 3 months ahead of schedule. Each YGN unit produces approximately 1,050 Mwe and supplies approximately ten percent of the total electric power demand in the Republic of Korea (ROK). The overall plant efficiency is approximately 37% which is at least 1% higher than most nuclear units. Since achieving commercial operation, YGN Unit 3 has operated at essentially full power which has resulted in an annual performance rate in excess of 85%. YGN Unit 3 is the first of six pressurized water reactors which are currently under design and construction in the ROK and serves as the reference design for the Korean Standard Nuclear Power Plant program. Both YGN Units 3 and 4 include a System 800 Nuclear Steam Supply System (NSSS). The NSSS is rated at 2,815 Mwth and is the ABB-CE standard design. The design includes numerous advanced design features which enhance plant safety, performance and operability. A well executed startup test program was successfully completed on both units prior to commercial operation. A summary of the YGN NSSS design features, the startup test program and selected test results demonstrating the performance of those features are presented in this paper

  18. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1987-01-01

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction [sr

  19. Reactor Core Internals Replacement of Ikata Units 1 and 2

    International Nuclear Information System (INIS)

    Ikeda, K.; Ishikawa, T.; Miyoshi, T.; Takagi, T.

    2012-01-01

    This paper presents an overview of the reactor core internals replacement project carried out at the Ikata Nuclear Power Station in Japan, which was the first of its kind among PWRs in the world. Failure of baffle former bolts was first reported in 1989 at Bugey 2 in France. Since then, similar incidents have been reported in Belgium and in the U.S., but not in Japan. However, the possibility of these bolts failing in Japanese plants cannot be denied in the future as operating hours increase. Ageing degradation mechanisms for the reactor core internals include irradiation-assisted stress corrosion cracking of baffle former bolts and mechanical wear of control rod guide cards. Two different approaches can be taken to address these ageing issues: to inspect and repair whenever a problem is found; and to replace the entire core internals with those of a new design having advanced features to prevent ageing degradation problems. The choice of our company was the latter. This paper explains the reasons for the choice and summarizes the replacement project activities at Ikata Units 1 and 2 as well as the improvements incorporated in the new design. (author)

  20. Artificial intelligence program in a computer application supporting reactor operations

    International Nuclear Information System (INIS)

    Stratton, R.C.; Town, G.G.

    1985-01-01

    Improving nuclear reactor power plant operability is an ever-present concern for the nuclear industry. The definition of plant operability involves a complex interaction of the ideas of reliability, safety, and efficiency. This paper presents observations concerning the issues involved and the benefits derived from the implementation of a computer application which combines traditional computer applications with artificial intelligence (AI) methodologies. A system, the Component Configuration Control System (CCCS), is being installed to support nuclear reactor operations at the Experimental Breeder Reactor II

  1. Code on the safety of nuclear research reactors: Operation

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this publication is to provide the essential requirements and recommendations for the safe operation of research reactors, with emphasis on the supervisory and managerial aspects. However, the publication also provides some guidance and information on topics concerning all the organizations involved in operation. These objectives are expressed in terms of requirements and recommendations for the safe operation of research reactors. Emphasis is placed on the safety requirements that shall be met rather than on the ways in which they can be met. The requirements and recommendations may form the foundation necessary for a Member State to develop regulations and safety criteria for its research reactor programme.

  2. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Milosevic, M.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.

    1981-12-01

    The RA nuclear reactor stopped operation after March 1979 campaign due to appearance of aluminium oxyhydrates deposits on the surface of fuel element claddings. Relevant decisions of the Sanitary inspection body of the Ministry of health and the Director General of the 'Boris Kidric' Institute of nuclear sciences, Vinca, banned further reactor operation until reasons caused aluminium oxyhydrates deposition are investigated and removed to enable regular reactor operation. Until the end of 1979 and during 1980, after a series of analyses and findings that caused cease of reactor operation, all the preparatory actions needed for restart were performed. Due to the fact that there is no emergency cooling system and no appropriate filtering system at the reactor, and according to the new regulations about start up of nuclear facilities, the Sanitary inspection body made a decision about temporary licence for reactor start-up meaning performance of the 'zero experiment' limiting the operating power to 1% of the nominal power. Accordingly the reactor was restarted on January 21 1981. Criticality was reached with the core made of 80% enriched fuel elements only. After the experiment was finished by the end of March a permission was demanded for operation at higher power levels at full power. Taking into account the state of the reactor components the operating licence was issued limiting the power to 2 MW until reconstruction of the ventilation system and construction of the emergency cooling system are fulfilled. Program of testing operation started on September 15 1981 increasing gradually the operating power. Thus the reactor was operated at 2 MW power for 15 days during November and December. The total production achieved in 1981 was 1698 MWh. This enabled isotopes production at the reactor during last two months. Control and maintenance of the reactor components and systems was done regularly and efficiently within limits imposed by availability of spare parts. The

  3. Calculations for accidents in water reactors during operation at power

    International Nuclear Information System (INIS)

    Blanc, H.; Dutraive, P.; Fabrega, S.; Millot, J.P.

    1976-07-01

    The behaviour of a water reactor on an accident occurring as the reactor is normally operated at power may be calculated through the computer code detailed in this article. Reactivity accidents, loss of coolant ones and power over-running ones are reviewed. (author)

  4. Operating reactors licensing actions summary. Volume 5, No. 9

    International Nuclear Information System (INIS)

    1985-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  5. Operating reactors licensing actions summary. Volume 5, No. 8

    International Nuclear Information System (INIS)

    1985-10-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  6. Operating reactors licensing actions summary. Volume 4, No. 9

    International Nuclear Information System (INIS)

    1984-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the division of licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  7. Operating reactors licensing actions summary. Vol. 4, No. 2

    International Nuclear Information System (INIS)

    1984-04-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  8. Development of operation management database for research reactors

    International Nuclear Information System (INIS)

    Zhang Xinjun; Chen Wei; Yang Jun

    2005-01-01

    An Operation Database for Pulsed Reactor has been developed on the platform for Microsoft visual C++ 6.0. This database includes four function modules, fuel elements management, incident management, experiment management and file management. It is essential for reactor security and information management. (authors)

  9. Tightening unit EZ 250 for VVER 1000 type reactor pressure vessel head flange joints

    International Nuclear Information System (INIS)

    Ruchar, Miloslav; Nadenik, Tomas; Kroj, Ludek

    2010-01-01

    The programme of flange joints tightening by seals made of expanded graphite for VVER 440 and VVER 1000 reactor head flange joints is highlighted, and tightening units of row EZ 650 and EZ 650 TK and KNI for VVER 440 reactor head flange joints and EZ 250 tightening unit for VVER 1000 reactor head flange joints are described in detail. The main advantages of electronically controlled tightening units include: Precise and uniform compression of the gasket during the tightening procedure; Automated solution to the graphite relaxing problem during tightening; Possibility of diagnosis of the thread status of the joints being tightened; Alleviation of operator's tough work; Shorter time of tensioning associated with a lower collective doses; Quick preparation of tightening procedure report from the data measured; Calibration renewal is possible in advance at time of unit storage without the need to place it on a real joint. (P.A.)

  10. Study on the power control system for NPP power unit with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Aleksandrova, N.D.; Naumov, A.V.

    1981-01-01

    Results of model investigations into basic version of the power control systems (PCS) conformably to the WWER-440 NPP power unit are stated. Transient processes in the power unit system when being two PCS versions during perturbations of different parameters: unit power, vapour pressure or position of control rods have been simulated. Investigations into the different PCS versions show that quality of operation of a traditional scheme with a turbine power controller and reactor pressure controller can be significantly improved with the introduction of a high-speed signal of pressure into the reactor controller. The PCS version with the compensation of interrelations between the turbine and reactor controllers constructed according to the same principles as the standard schemes of power units of thermal electric power plant is perspective as well [ru

  11. Reactor oscillator - Proposal of the organisation for oscillator operation; Reaktorski oscilator - Predlog organizacije rada na oscilatoru

    Energy Technology Data Exchange (ETDEWEB)

    Lolic, B; Loloc, B [Institute of Nuclear Sciences Boris Kidric, Laboratorija za fiziku reaktora, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    The organizational structure for operating the reactor with the reactor oscillator describes the duties of the reactor operators; staff responsible for operating the oscillator who are responsible for measurements, preparation of the samples and further treatment of the obtained results.

  12. Analysis of the radiometric survey during the Argonauta reactor operation

    International Nuclear Information System (INIS)

    Oliveira, Eara de S.L.; Cardozo, Katia K.M.; Silva, Joao Carlos P.; Santos, Joao Regis dos

    2013-01-01

    The Argonaut reactor at the Institute of Nuclear Engineering-IEN/CNEN, operates normally, the powers between 1.7 and 340 W on neutrongraphy procedures, production of radionuclides and experimental reactor physics lessons to postgraduate courses. The doses from neutrons and gamma radiation are measured when the reactor is critical, inside the reactor hall and surrounding regions. A study of the data obtained was performed to evaluate the daily need of this survey in the reactor hall. Taking into account the principle ALARA, which aims to optimize and minimize the dose received by the individual, we propose, in this work, through an analysis of the acquired data in occupational radiometric surveys, a reformulation of the area monitoring routine practiced by the team of radiological protection of the Institute of Nuclear Engineering - IEN/CNEN-RJ, whereas other monitoring routines regarding the radiological protection are also applied in the routine of the reactor. The operations under review occurred with the reactor operating 340 W power at intervals of 60, 120 and 180 minutes, in monitoring points in controlled areas, supervised and free. The results showed significant dose values in the output of the J-Channel 9 when the operation occurs with this open. With 180 minutes of operation, the measured values of dose rate were lower than the values at 60 min and 120 operations min. At the point in the supervised area, offsite to the reactor hall, situated in the direction of the J-Channel 9, the value reduces more than 14% in any operating time in relation to the dose rate measured at the point opposite the canal. There is a 50% reduction in the dose rates for operations with and J-9 closed. The results suggest a new frequency of radiometric survey whose mode of operation is maintained in similar conditions, since combined with other relevant practices of radiation protection

  13. Physics experiments with the operating reactor

    Energy Technology Data Exchange (ETDEWEB)

    Cullington, G R; King, D C

    1973-09-27

    Experimental techniques have been developed and used on Dragon to give consistent information on excess reactivity and shut down margin. The reactivity measurements have been correlated with the theoretical calculations and have led to improvements in the calculations. The methods used and the results obtained are accepted by the Safety Committee as sufficient evidence for compliance with the fuel loading safety rules. Although the reactor was not designed as an experimental facility, flux and dose measurements experiments have been successfully carried out. Mass flow and negative reactivity transient measurements have been carried out. These are valuable for demonstration of the flexibility of the reactor system and for giving confidence in theoretical calculations.

  14. Computer based core monitoring system for an operating CANDU reactor

    International Nuclear Information System (INIS)

    Yoon, Moon Young; Kwon, O Hwan; Kim, Kyung Hwa; Yeom, Choong Sub

    2004-01-01

    The research was performed to develop a CANDU-6 Core Monitoring System(CCMS) that enables operators to have efficient core management by monitoring core power distribution, burnup distribution, and the other important core variables and managing the past core history for Wolsong nuclear power plant unit 1. The CCMS uses Reactor Fueling Simulation Program(RFSP, developed by AECL) for continuous core calculation by integrating the algorithm and assumptions validated and uses the information taken from Digital Control Computer(DCC) for the purpose of producing basic input data. The CCMS has two modules; CCMS server program and CCMS client program. The CCMS server program performs automatic and continuous core calculation and manages overall output controlled by DataBase Management System. The CCMS client program enables users to monitor current and past core status in the predefined GUI(Graphic-User Interface) environment. For the purpose of verifying the effectiveness of CCMS, we compared field-test data with the data used for Wolsong unit 1 operation. In the verification the mean percent differences of both cases were the same(0.008%), which showed that the CCMS could monitor core behaviors well

  15. Simulation for Remote Operation for REX10 Nuclear Reactor

    International Nuclear Information System (INIS)

    Lee, Sim Won; Kim, Dong Su; Na, Man Gyun; Lee, Yoon Joon; Lee, Yeon Gun; Park, Goon Cherl

    2010-01-01

    The newly designed REX10 (Regional Energy Reactor, 10MWth) is an environmentally-friendly and stable small nuclear reactor for a small-scale reactor based Multi-purpose regional energy system. The REX10 has been developed to maintain system safety in order to be placed in densely populated region, island, etc. In addition, it is significantly hard to recruit many operation and maintenance personnel for small power reactors differently from usual commercial reactors because of its remote location and of economic reasons. In order to overcome these constraints, to decrease the operation cost by reducing operation and maintenance personnel, and to increase plant reliability through autonomous plant control, it is needed to design the control system of the small power reactors and to establish its unmanned remote operation system. In this study, the REX10 reactor core thermal power controller is designed by using a REX10 code analyzer. The remote control facility through man-machine interface (MMI) design and interface between programming languages was established and it was used to verify remote operation of REX10

  16. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1986-01-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  17. Reactor helium system, design specification, operation and handling

    International Nuclear Information System (INIS)

    Badrljica, R.

    1984-06-01

    Apart from detailed design specification of the helium cover gas system of the Ra reactor, this document includes description of the operating regime, instructions for manipulations in the system with the aim of achieving and maintaining stationary gas circulation [sr

  18. Operating history of U.S. nuclear power reactors

    International Nuclear Information System (INIS)

    1974-01-01

    The operating history of U. S. nuclear power plants through December 31, 1974 has been collected. Included are those nuclear reactor facilities which produce electricity, even if in token amounts, or which are part of a development program concerned with the generation of electricity through the use of a nuclear reactor as a heat source. The information is based on data furnished by facility operators. The charts are plotted in terms of cumulative thermal energy as a function of time. Since only those shutdowns of five days or more are shown, the charts do not give a detailed history of plant operation. They do, however, give an overview of the operating history of a variety of developmental and experimental nuclear power reactors. The data show the yearly gross generation of electricity for each U. S. nuclear plant and, for civilian power plants, information on reactor availability and plant capacity factor. (U.S.)

  19. RA reactor operation and maintenance; Pogon i odrzavanje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air.

  20. Safe operation of critical assemblies and research reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-09-15

    Some countries have accumulated considerable experience in the operation of these reactors and have in the process developed safe practices. On the other hand, other countries which have recently acquired, or will soon acquire, such reactors do not have sufficient background of experience with them to have developed full knowledge regarding their safe operation. In this situation, the International Atomic Energy Agency has considered that it would be useful to make available to all its Member States a set of recommendations on the safe operation of these reactors, based on the accumulated experience and best practices. The Director General accordingly nominated a Pane Ion Safe Operation of Critical Assemblies and Research Reactors to assist the Agency's Secretariat in drafting such recommendations

  1. Operational experience in the United Kingdom

    International Nuclear Information System (INIS)

    Gronow, W.S.

    1977-01-01

    In the UK there are 26 Magnox reactors and 4 AGRs operating on 11 licensed sites; a further 6 AGRs are under construction on 2 additional and one of the existing sites. The arrangements by which the Nuclear Installations Inspectorate, on behalf of the Health and Safety Executive, carries out its regulatory functions at operating nuclear power plants are described. The range of activities undertaken is described with special reference being made to the biennial shutdowns for approved maintenance and inspections which are required by conditions attached to the site licence. The other means by which the continuing safety of these power reactors is assured are explained and include the relationship with the licensee's own Nuclear Safety Committee, approved arrangements for modifications to plant systems or components which have importance for safety and long term reviews of safety aspects. (author)

  2. Modelling of temperature distribution and pulsations in fast reactor units

    International Nuclear Information System (INIS)

    Ushakov, P.A.; Sorokin, A.P.

    1994-01-01

    Reasons for the occurrence of thermal stresses in reactor units have been analyzed. The main reasons for this analysis are: temperature non-uniformity at the output of reactor core and breeder and the ensuing temperature pulsation; temperature pulsations due to mixing of sodium jets of a different temperature; temperature nonuniformity and pulsations resulting from the part of loops (circuits) un-plug; temperature nonuniformity and fluctuations in transient and accidental shut down of reactor or transfer to cooling by natural circulation. The results of investigating the thermal hydraulic characteristics are obtained by modelling the processes mentioned above. Analysis carried out allows the main lines of investigation to be defined and conclusions can be drawn regarding the problem of temperature distribution and fluctuation in fast reactor units

  3. Operation monitoring and protection method for nuclear reactor

    International Nuclear Information System (INIS)

    Tochihara, Hiroshi.

    1995-01-01

    In an operation and monitoring method for a PWR-type reactor by using a tetra-sected neutron detector, axial off set is defined by neutron detector signals with respect to an average of the reactor core, the upper half of the reactor core, and the lower half of the reactor core. A departure from nucleate boiling (DNBR) is represented by standardized signals, and the DNBR is calculated by using the axial off set of the average of the reactor core, the upper half of the reactor core, and the lower half of the reactor core, and they are graphically displayed. In addition, a thermal flow rate-water channel coefficient is also graphically displayed, and the DNBR and the thermal flow rate-water channel coefficient are restricted based on the display, to determine an allowable operation range. As a result, it is possible to provide an operation monitoring and protection method for nuclear reactor capable of reducing labors and frequencies for the change of protection system setting in a case of using a tetra-sected neutron detector disposed at the outside and, at the same time, protecting each of DNR and the highest linear power or the thermal water coefficient channel. (N.H.)

  4. Reactor pressure vessel integrity of Genkai Unit 1

    International Nuclear Information System (INIS)

    Nakamuta, Y.; Nozaki, G.; Saruwatari, T.; Watanabe, S.; Yamashita, Y.

    2015-01-01

    The structural integrity of reactor pressure vessels (RPVs) of commercial nuclear power plants in Japan has to be confirmed for the continuing operation according to the Japanese technical standards, JEAC4206-2007 and JEAC4201-2007, which specify the procedures to evaluate the structural integrity of RPVs and the embrittlement of RPV materials, respectively. The structural integrity analysis of Genkai Unit 1 RPV was performed based on the 4. surveillance data. Even though the ΔRT(NDT) obtained for the base metal was larger than the prediction of the current embrittlement correlation method of JEAC4201-2007, the structural integrity of the RPV during PTS event was confirmed with a sufficient margin. The reason of the large ΔRT(NDT) in the base metal was investigated thoroughly in terms of the microstructural changes caused by the neutron irradiation. The study showed that the microstructural changes are all as expected for this class of material, no grain boundary fracture occurred, the material is homogeneous in terms of chemical composition, and the chemical compositions which are important for the evaluation of embrittlement are correct. All these results suggested room for improvement of the current embrittlement correlation method in JEAC4201-2007. Using Genkai Unit 1 data as well as other recent surveillance data, the embrittlement correlation method has been modified so that the recent high fluence data can be predicted with higher accuracy, and was issued as JEAC4201-2007, 2013 addendum. It has been demonstrated that the RPV materials of the Genkai Unit 1 meet the requirements of JEAC4206-2007 and can be used for the continuing safe operation up to 60 years

  5. Flux distribution measurements in the Bruce A unit 1 reactor

    International Nuclear Information System (INIS)

    Okazaki, A.; Kettner, D.A.; Mohindra, V.K.

    1977-07-01

    Flux distribution measurements were made by copper wire activation during low power commissioning of the unit 1 reactor of the Bruce A generating station. The distribution was measured along one diameter near the axial and horizontal midplanes of the reactor core. The activity distribution along the copper wire was measured by wire scanners with NaI detectors. The experiments were made for five configurations of reactivity control mechanisms. (author)

  6. Venting krypton-85 from the Three Mile Island Unit 2 reactor building

    International Nuclear Information System (INIS)

    Burton, H.M.

    1981-01-01

    To permit the less restricted access to the reactor building necessary to maintain instrumentation and equipment, and to proceed towad the total decontamination of the facility, General Public Utilities, operators of the facility referred to hereafter as GPU, asked the United States Nuclear Regulatory Commission, or NRC, for permission to remove the 85 Kr from the reactor building by venting it to the environment. GPU supported their request with the Safety Analysis and Environmental Assessment Report on the proposed reactor building venting plan. On June 12, 1980, after seven months of licensing deliberations and numerous public hearings, the NRC granted GPU's request. The actual venting took place between June 28 and July 11, 1980. This report presents an overview of the detailed effort involved in the TMI-2 reactor building venting program. The findings reported here are condensed from a published report entitled TMI-2 Reactor Building Purge--Kr-85 Venting

  7. Procedure for operating a heavy water cooled power reactor

    International Nuclear Information System (INIS)

    Rau, P.; Kumpf, H.

    1981-01-01

    Nuclear reactors cooled by heavy water usually have equipment for fuel element exchange during operation, with the primary circuit remaining contained. This fuel element exchange equipment is expensive and complicated in many respects. According to the invention, the heavy water is therefore replaced by light water after a certain time of operation in such way that light water is led in and heavy water is led off. After the replacement, at least a quarter of the fuel elements of the reactor core is exchanged with the reactor pressure vessel being open. Then the light water serving as a shielding is replaced by heavy water, with the reactor pressure vessel being closed. The invention is of interest particularly for high-conversion reactors. (orig.) [de

  8. Training and qualification of licensed reactor operators at General Public Utilities Nuclear Corporation

    International Nuclear Information System (INIS)

    Long, R.L.; Coe, R.P.

    1992-01-01

    Following the Three Mile Island-2 (TMI-2) accident in 1979, the utility responsible for managing the facility has looked closely at the training and qualification of its reactor operators. Performance-based operator training programmes are now in place, as required by the United States National Academy for Nuclear Training. Operators also participate directly in the development of a professional code of behaviour. (UK)

  9. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1984-12-01

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization

  10. Development of inspection and maintenance program for reactor and reactivity control units in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong-Garp

    1998-01-01

    This paper summarizes the overall program for inspection and maintenance of reactor structure and Reactivity Control Units (RCU) of HANARO during lifetime. The long-term plan for in-service inspection is introduced in the viewpoint of the structural integrity of reactor and RCU, and the operability of RCU mechanism. This program includes the list of components to be inspected, the schedule of inspection and maintenance, and the development of special tools and test rig that are required for the remote inspection and maintenance of reactor and RCU components. Preliminary results of the evaluation on the lifetime of RCU components are summarized based on the operation history since the installation of reactor. A test rig will be designed and constructed for the purposes of verifying the prolonged lifetime of RCU components being used, the performance of special tools, and the rehearsal of maintenance work as well. (author)

  11. Nuclear units operating improvement by using operating experience

    International Nuclear Information System (INIS)

    Rotaru, I.; Bilegan, I.C.

    1997-01-01

    The paper presents how the information experience can be used to improve the operation of nuclear units. This areas include the following items: conservative decision making; supervisory oversight; teamwork; control room distraction; communications; expectations and standards; operator training and fundamental knowledge, procedure quality and adherence; plant status awareness. For each of these topics, the information illustrate which are the principles, the lessons learned from operating experience and the most appropriate exemplifying documents. (authors)

  12. Dry cooling tower operating experience in the LOFT reactor

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    A dry cooling tower has been uniquely utilized to dissipate heat generated in a small experimental pressurized water nuclear reactor. Operational experience revealed that dry cooling towers can be intermittently operated with minimal wind susceptibility and water hammer occurrences by cooling potential steam sources after a reactor scram, by isolating idle tubes from the external atmosphere, and by operating at relatively high pressures. Operating experience has also revealed that tube freezing can be minimized by incorporating the proper heating and heat loss prevention features

  13. Operation control equipment for BWR type reactor

    International Nuclear Information System (INIS)

    Izumi, Masayuki; Takeda, Renzo.

    1981-01-01

    Purpose: To improve the temperature balance in a feedwater heater by obtaining the objective value of a feedwater enthalpy upon calculation of respective measured values and controlling the opening or closing of an extraction valve so that the objective value may coincide with the measured value, thereby averaging the axial power distribution. Constitution: A plurality of stages of extraction lines are connected to a turbine, and extraction valves are respectively provided at the lines. By calculating the measured values of ractor pressure, reactor core flow rate, vapor flow rate and reactor core inlet enthalpy determined to predetermined value using heat balance the objective feedwater enthalpy is obtained, is fed as an extraction valve opening or closing signal from a control equipment, the extraction stages of the turbine extraction are altered in accordance with this signal, and the feedwater enthalpy is controlled. (Sekiya, K.)

  14. Method of operating a nuclear reactor

    International Nuclear Information System (INIS)

    Gyorey, G.L.; Parkos, G.R.; Roupe, G.A.; Thomson, O.A.; Crowther, R.L.

    1979-01-01

    The invention concerns the configuration of control rods in the lattice of the reactor core, as well as an instruction on the sequence of with drawal for the control rods, arranged in groups, in order to achieve for the control rod reactivity of the control rods remaining in the reactor core to adopt the lowest possible value. The rods are combined in several 3 x 3 matrices which in their turn are grouped into two networks. The groups are moved successively according to a specified schedule. There can be achieved maximum control rod reactivities between 0.025 and 0.035 (referred to the totally withdrawn state). (RW) 891 RW/RW 892 MKO [de

  15. Research reactor operations for neutron activation analysis

    International Nuclear Information System (INIS)

    Tv'ehlov, Yu.

    2002-01-01

    The IAEA Special Manual devoted to quality control during neutron activation analysis (NAA) on research and test reactors is discussed. Three parts of the publication involve presentation of common rules for performance of NAA, quantitative and qualitative analyses, statistic and systematic errors, safety regulations and radioactive waste management. Besides, the publication contains practical manual for the performance of NAA, and examples of different NAA regulating registration forms are presented [ru

  16. Application of SAFE to an operating reactor

    International Nuclear Information System (INIS)

    Chapman, L.D.

    1979-01-01

    A method for the evaluation of physical protection systems at nuclear facilities has been developed. The evaluation process consists of five major phases: (1) Facility Characterization, (2) Facility Representation, (3) Component Performance, (4) Adversary Path Analysis, and (5) Effectiveness Evaluation. Each of these phases will be described in some detail and illustrated by examples. The process for evaluation of physical protection system effectiveness against an outside threat will be presented for a reactor facility

  17. Operating experience feedback from safety significant events at research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Shokr, A.M. [Atomic Energy Authority, Abouzabal (Egypt). Egypt Second Research Reactor; Rao, D. [Bhabha Atomic Research Centre, Mumbai (India)

    2015-05-15

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  18. L-Reactor operation, Savannah River Plant: environmental assessment

    International Nuclear Information System (INIS)

    1982-08-01

    The purpose of this document is to assess the significance of the effects on the human environment of the proposed resumption of L-reactor operation at the Savannah River Plant, scheduled for October 1983. The discussion is presented under the following section headings: need for resumption of L-Reactor operations and purpose of this environmental assessment; proposed action and alternative; affected environment (including, site location and description, land use, historic and archeological resources, socioeconomic and community characteristics, geology and seismology, hydrology, meteorology and climatology, ecology, and radiation environment); environmental consequences; summary of projected L-Reactor releases and impacts; and Federal and State permits and approval. The three appendices are entitled: radiation dose calculation methods and assumptions; floodplain/wetlands assessment - L-Reactor operations; and, conversion table. A list of references is included at the end of each chapter

  19. Operating experience feedback from safety significant events at research reactors

    International Nuclear Information System (INIS)

    Shokr, A.M.

    2015-01-01

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  20. Completely automated nuclear reactors for long-term operation

    International Nuclear Information System (INIS)

    Teller, E.; Ishikawa, M.; Wood, L.

    1996-01-01

    The authors discuss new types of nuclear fission reactors optimized for the generation of high-temperature heat for exceedingly safe, economic, and long-duration electricity production in large, long-lived central power stations. These reactors are quite different in design, implementation and operation from conventional light-water-cooled and -moderated reactors (LWRs) currently in widespread use, which were scaled-up from submarine nuclear propulsion reactors. They feature an inexpensive initial fuel loading which lasts the entire 30-year design life of the power-plant. The reactor contains a core comprised of a nuclear ignitor and a nuclear burn-wave propagating region comprised of natural thorium or uranium, a pressure shell for coolant transport purposes, and automatic emergency heat-dumping means to obviate concerns regarding loss-of-coolant accidents during the plant's operational and post-operational life. These reactors are proposed to be situated in suitable environments at ∼100 meter depths underground, and their operation is completely automatic, with no moving parts and no human access during or after its operational lifetime, in order to avoid both error and misuse. The power plant's heat engine and electrical generator subsystems are located above-ground

  1. Operation characteristics and conditions of training reactor VR-1

    International Nuclear Information System (INIS)

    Matejka, K.; Kolros, A.; Polach, S.; Sklenka, L.

    1994-01-01

    The first 3 years of operation of the VR-1 training reactor are reviewed. This period includes its physical start-up (preparation, implementation, results) and operation development as far as the current operating configuration of the reactor core. The physical start-up was commenced using a reactor core referred to as AZ A1, whose physical parameters had been verified by calculation and whose configuration was based on data tested experimentally on the SR-0 reactor at Vochov. The next operating core, labelled AZ A2, was already prepared during the test operation of the VR-1 reactor. Its configuration was such that both of the main horizontal channels, radial and tangential, could be employed. The configuration that followed, AZ A3, was an intermediate step before testing the graphite side reflector. The current reactor core, labelled AZ A3 G, was obtained by supplementing the previous core with a one-sided graphite side reflector. (Z.S.). 2 tabs., 11 figs., 2 refs

  2. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report [sr

  3. Fast pyrolysis of biomass in the rotating cone reactor. Reactor development and operation. Final report

    International Nuclear Information System (INIS)

    Gansekoele, E.; Wagenaar, B.M.

    2001-07-01

    This report describes the design and characteristics of BTGs pyrolysis plant with a biomass throughput capacity of 50 kg per hour. The pilot plant has been developed for 2 reasons: to produce modest quantities of bio-oil for application purposes, and to generate know-how for the development of a larger 200 kg/hr pilot plant. The design of the 50 kg/hr plant continues the development line which started in 1995 when a similar unit was delivered to China. Major design improvements of the current pyrolysis unit are that it can be operated in a continuous mode and utilizes the combustion heat of the produced char to heat the pyrolysis process. A measurement program has meanwhile been executed as a means to characterize the pyrolysis plant. Results of the characterization study were the following: the pilot plant produces approx. 35 liters of bio-oil per hour and thus achieves a maximum oil yield of 70 weight percent. The bio-oil yield of the plant was inversely proportional with the reactor temperature and inversely proportional with the gas phase residence time. As a result of the pilot plant operation, a few tons of bio-oil have been produced; alongside with a bulk of know-how. All know-how has successfully been utilized in the development of the 200 kg per hour facility

  4. RA research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1985

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1985-01-01

    According to the plan, RA reactor was to be in operation in mid September 1985. But, since the building of the emergency cooling system, nor the reconstruction of the existing special ventilation system were not finished until the end of August reactor was not operated during 1985. During the previous four years reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care, which was cancelled in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981-1984. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks have started: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. IAEA has approved the amount of 1,300,000 US dollars for the renewal of the instrumentation [sr

  5. The evaluation of operator reliability factors on power reactor

    International Nuclear Information System (INIS)

    Karlina, Itjeu; Supriatna, Piping; W, Suharyo; Santosa, Kussigit; Darlis; S, Bambang; Y, Sasongko

    1999-01-01

    The sophisticated technology system was not assured the reliability system itself because it has contained a part of human dependence affected successfully of reactor operation either how work smoothly and safe or failure ac cured and then accident appears promptly. The evaluation of operator reliability factor on ABWR power reactor has been carried out which consist of criterion skill and workload according to NUREG/CR-2254, NUREG/CR-4016 and NUREG-0835 the reactor operation reliability emphasize to the operator are synergic between skill and workload themselves. The employee's skill will affect to the type and level of their tasks. The operator's skill depend on education and experiences, position or responsibility of tasks, physical conditions (age uninvalid of physic/mental

  6. Independent verification: operational phase liquid metal breeder reactors

    International Nuclear Information System (INIS)

    Bourne, P.B.

    1981-01-01

    The Fast Flux Test Facility (FFTF) recently achieved 100-percent power and now is in the initial stages of operation as a test reactor. An independent verification program has been established to assist in maintaining stable plant conditions, and to assure the safe operation of the reactor. Independent verification begins with the development of administrative procedures to control all other procedures and changes to the plant configurations. The technical content of the controlling procedures is subject to independent verification. The actual accomplishment of test procedures and operational maneuvers is witnessed by personnel not responsible for operating the plant. Off-normal events are analyzed, problem reports from other operating reactors are evaluated, and these results are used to improve on-line performance. Audits are used to confirm compliance with established practices and to identify areas where individual performance can be improved

  7. Self-operation type power control device for nuclear reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kanbe, Mitsuru.

    1993-07-23

    The device of the present invention operates by sensing the temperature change of a reactor core in all of LMFBR type reactors irrespective of the scale of the reactor core power. That is, a region where liquid poison is filled is disposed at the upper portion and a region where sealed gases are filled is disposed at the lower portion of a pipe having both ends thereof being closed. When the pipe is inserted into the reactor core, the inner diameter of the pipe is determined smaller than a predetermined value so that the boundary between the liquid poison and the sealed gases in the pipe is maintained relative to an assumed maximum acceleration. The sealed gas region is disposed at the reactor core region. If the liquid poison is expanded by the elevation of the reactor core exit temperature, it is moved to the lower gas region, to control the reactor power. Since high reliability can be maintained over a long period of time by this method, it is suitable to FBR reactors disposed in such environments that maintenance can not easily be conducted, such as desserts, isolated islands and undeveloped countries. Further, it is also suitable to ultra small sized nuclear reactors disposed at environments that the direction and the magnitude of gravity are different from those on the ground. (I.S.).

  8. Self-operation type power control device for nuclear reactor

    International Nuclear Information System (INIS)

    Kanbe, Mitsuru.

    1993-01-01

    The device of the present invention operates by sensing the temperature change of a reactor core in all of LMFBR type reactors irrespective of the scale of the reactor core power. That is, a region where liquid poison is filled is disposed at the upper portion and a region where sealed gases are filled is disposed at the lower portion of a pipe having both ends thereof being closed. When the pipe is inserted into the reactor core, the inner diameter of the pipe is determined smaller than a predetermined value so that the boundary between the liquid poison and the sealed gases in the pipe is maintained relative to an assumed maximum acceleration. The sealed gas region is disposed at the reactor core region. If the liquid poison is expanded by the elevation of the reactor core exit temperature, it is moved to the lower gas region, to control the reactor power. Since high reliability can be maintained over a long period of time by this method, it is suitable to FBR reactors disposed in such environments that maintenance can not easily be conducted, such as desserts, isolated islands and undeveloped countries. Further, it is also suitable to ultra small sized nuclear reactors disposed at environments that the direction and the magnitude of gravity are different from those on the ground. (I.S.)

  9. Regulations and instructions for RB reactor operation; Propisi i uputstva za rad reaktora RB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-07-01

    This document includes regulations for reactor RB operation, behaviour and presence of staff in the reactor building; regulations for performing experiments at the RB reactor, regulations and int ructions for the reactor operators and other staff on duty. A chapter is devoted to instruction for reactor operation with the operating documentation and special duties of the operators. Regulations and instruction concerned with accidents are described with classification of accidents and evacuation plan. Annexes to this document include: the present status of the reactor; program for training the reactor operators; forms which are obligatory to be signed for any operating activity, and the certificate of the RB reactor lattice.

  10. Status of liquid metal reactor development in the United States of America

    International Nuclear Information System (INIS)

    Griffith, J.D.; Horton, K.E.

    1991-01-01

    An existing network of government and industry research facilities and engineering test centers in the United States is currently providing test capabilities and the technical expertise required to conduct an aggressive advanced reactor development program. Subsequent to the directive to shut down the Fast Flux Test Facility in early 1990, a variety of activities were undertaken to provide support for continued operation. The United States has made substantial progress in achieving ALMR program objectives. The metal fuel cycle is designed to recycle and burn its own actiniums, and has the potential to be a very effective burner of actiniums generated in the LWRs. The current emphasis in the IFR Program is on the comprehensive development of the IFR (Integral Fast Reactor) technology, to be followed by a period of technology demonstration which would verify the economic feasibility of the concept. The United States has been active in international cooperative activities in the fast reactor sector since 1969. (author). 11 figs, 1 tab

  11. Extending the maximum operation time of the MNSR reactor.

    Science.gov (United States)

    Dawahra, S; Khattab, K; Saba, G

    2016-09-01

    An effective modification to extend the maximum operation time of the Miniature Neutron Source Reactor (MNSR) to enhance the utilization of the reactor has been tested using the MCNP4C code. This modification consisted of inserting manually in each of the reactor inner irradiation tube a chain of three polyethylene-connected containers filled of water. The total height of the chain was 11.5cm. The replacement of the actual cadmium absorber with B(10) absorber was needed as well. The rest of the core structure materials and dimensions remained unchanged. A 3-D neutronic model with the new modifications was developed to compare the neutronic parameters of the old and modified cores. The results of the old and modified core excess reactivities (ρex) were: 3.954, 6.241 mk respectively. The maximum reactor operation times were: 428, 1025min and the safety reactivity factors were: 1.654 and 1.595 respectively. Therefore, a 139% increase in the maximum reactor operation time was noticed for the modified core. This increase enhanced the utilization of the MNSR reactor to conduct a long time irradiation of the unknown samples using the NAA technique and increase the amount of radioisotope production in the reactor. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. The human factor in nuclear reactor operation

    International Nuclear Information System (INIS)

    Bertron, L.

    1982-05-01

    The principal operating characteristics of nuclear power plants are summarized. A description of major hazards relating to operator fallibility in normal and abnormal operating conditions is followed by a specific analysis of control room hazards, shift organization and selection and training of management personnel

  13. Licensed operating reactors: Status summary report, data as of October 31, 1988

    International Nuclear Information System (INIS)

    1988-12-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  14. Licensed operating reactors: Status summary report, data as of 07-31-88

    International Nuclear Information System (INIS)

    1988-09-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  15. Licensed operating reactors: Status summary report, data as of August 31, 1988

    International Nuclear Information System (INIS)

    1988-10-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  16. Licensed operating reactors: Status summary report, data as of May 31, 1988

    International Nuclear Information System (INIS)

    Schwartz, I.

    1988-07-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resource Management from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operation units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by the NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. Licensed operating reactors. Status summary report, data as of 3-31-82

    International Nuclear Information System (INIS)

    1982-04-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Management and Program Analysis, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  18. Licensed operating reactors status summary report, data as of April 30, 1989

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  19. Licensed operating reactors status summary report, data as of December 31, 1985. Volume 10, No. 1

    International Nuclear Information System (INIS)

    1986-01-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the Errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  20. Operational margin monitoring system for boiling water reactor power plants

    International Nuclear Information System (INIS)

    Fukutomi, S.; Takigawa, Y.

    1992-01-01

    This paper reports on an on-line operational margin monitoring system which has been developed for boiling water reactor power plants to improve safety, reliability, and quality of reactor operation. The system consists of a steady-state core status prediction module, a transient analysis module, a stability analysis module, and an evaluation and guidance module. This system quantitatively evaluates the thermal margin during abnormal transients as well as the stability margin, which cannot be evaluated by direct monitoring of the plant parameters, either for the current operational state or for a predicted operating state that may be brought about by the intended operation. This system also gives operator guidance as to appropriate or alternate operations when the operating state has or will become marginless

  1. 14th Biennial conference on reactor operating experience plant operations: The human element

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Separate abstracts were prepared for the papers presented in the following areas of interest: enhancing operator performance; structured approaches to maintenance standards and reliability-centered maintenance; human issues in plant operations and management; test, research, and training reactor utilization; methods and applications of root-cause analysis; emergency operating procedure enhancement programs; test, research, and training reactor upgrades; valve maintenance and diagnostics; recent operating experiences; and current maintenance issues

  2. Operation of the OSIRIS reactor from the viewpoint of analysis of operator functions

    International Nuclear Information System (INIS)

    Fichet-Clairfontaine, P.Y.; Saint-Jean, T.

    1985-09-01

    This paper presents the results of analyses carried out on site by the Human Factor Study Laboratory in an experimental nuclear plant operated by the Atomic Energy Commissariat - the OSIRIS pool reactor. The analyses of certain tasks are given: work in the reactor hall and an operation of circuit setting performed by the mechanics. This work has thrown light on certain operational guidelines implemented by the operators when carrying out their work [fr

  3. Demonstrated operational and inherent safety of the prototype fast reactor (PFR)

    International Nuclear Information System (INIS)

    Smedley, J.A.; Gregory, C.V.; Judd, A.M.

    1983-01-01

    The Prototype Fast Reactor (PFR) is sited at Dounreay, on the north coast of Scotland in the United Kingdom, and has been in operation since 1974. Three aspects of the safety of the reactor are described, including the all-important practical consideration of operational safety, a demonstration of the limited consequences of a sodium/water reaction in a steam generator and the ability of the reactor to protect itself against highly improbable incidents. Attention is drawn to the low radiation levels in the plant and the correspondingly low dose rate to personnel. A feature of PFR operation has been the stable and predictable behaviour of its core together with the high degree of reliability exhibited by the engineered safety system. No failures have occurred within the standard driver charge but two experimental fuel pins suffered cladding failure, which was detected easily by the fission gas and delayed neutron detection systems. In the steam generating units sodium and water are separated by the single steel wall of the steam tubes. Although no under-sodium leak has occurred, an experimental programme is continuing and demonstrates that were any such leak to occur its consequences would be containable and would not result in the release of sodium to the environment or any breach of the reactor containment. The final section describes the inherent safety features of the reactor which enable it to survive a range of very improbable incidents even when the engineered safeguards fail. The features considered are natural circulation, which has been demonstrated by reactor experiment; the reactor's negative power coefficient, which, for example, enables the reactor to survive a complete loss of heat sink; and the durability of the fuel pins, demonstrated by a series of boiling experiments in the Dounreay Fast Reactor (DFR). (author)

  4. Pioneering SUPER - Small Unit Passively-safe Enclosed Reactor - 15559

    International Nuclear Information System (INIS)

    Bhownik, P.K.; Gairola, A.; Shamim, J.A.; Suh, K.Y.; Suh, K.S.

    2015-01-01

    This paper presents the basic features of the Small Unit Passively-safe Enclosed Reactor abbreviated as SUPER, a new reactor system that has been designed and proposed at the Seoul National University's Department of Energy Systems Engineering. SUPER is a small modular reactor system or SMR that is cooled by sub-cooled as well as supercritical water. As a new member of SMRs, SUPER is a small-scale nuclear plant that is designed to be factory-manufactured and shipped as modules to be assembled at a site. The concept offers promising answers to many questions about nuclear power including proliferation resistance, waste management, safety, and startup costs. SUPER is a customized paradigm of a supercritical water reactor or SCWR, a type sharing commonalities with the current fleet of light water reactors, or LWRs. SUPER has evolved from the System-integrated Modular Advance Reactor, or SMART, being developed at the Korea Atomic Energy Research Institute, or KAERI. SUPER enhanced the safety features for robustness, design/equipment simplification for natural convection, multi-purpose application for co-generation flexibilities, suitable for isolated or small electrical grids, just-in-time capacity addition, short construction time, and last, but not least, lower capital cost per unit. The primary objectives of SUPER is to develop the conceptual design for a safe and economic small, natural circulation SCWR, to address the economic and safety attributes of the concept, and to demonstrate its technical feasibilities. (authors)

  5. RA reactor operation and maintenance in 1989, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Sanovic, V.

    1989-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  6. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1988-01-01

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  7. Design of a periodically operated SCR reactor

    International Nuclear Information System (INIS)

    Kotter, M.; Lintz, H.G.; Turek, T.

    1993-01-01

    A new NO x abatement process uses the rotating Ljungstroem air heater of the power plant for the selective catalytic reduction (SCR) of nitrogen monoxide with ammonia. For this purpose the air heater elements are covered by a catalytically active layer. The transformation can be carried out by simple replacement of the original air heater elements. Thus nitrogen monoxide control is possible without requiring major modifications of existing power plant equipment. Two oxidic catalysts have been developed to be employed in the different temperature sections of the air heater. The activity of the catalysts has been quantified with the aid of laboratory scale experiments. The results can be described using a simple expression for the rate of the chemical reaction. NO conversion and NH 3 slip to be expected in a catalytically active Ljungstroem heat exchanger are calculated with a reactor model taking into account the gas phase mass transfer resistances. The calculations show that the proposed device can be used if the NO concentration in the flue gas does not exceed 300 ppm. Recently Kraftanlagen AG, Heidelberg, installed a catalyst air heater system at Mandalay Generating Station in Oxnard, California. The comparison of the predicted results with preliminary experimental data proves the validity of the chosen reactor model. Under the given conditions NO conversions of more than 60% can be achieved maintaining the NH 3 slip below the specified value of 10 ppm. (orig.). 19 figs., 35 refs [de

  8. Fluidized-bed reactors processes and operating conditions

    CERN Document Server

    Yates, John G

    2016-01-01

    The fluidized-bed reactor is the centerpiece of industrial fluidization processes. This book focuses on the design and operation of fluidized beds in many different industrial processes, emphasizing the rationale for choosing fluidized beds for each particular process. The book starts with a brief history of fluidization from its inception in the 1940’s. The authors present both the fluid dynamics of gas-solid fluidized beds and the extensive experimental studies of operating systems and they set them in the context of operating processes that use fluid-bed reactors. Chemical engineering students and postdocs as well as practicing engineers will find great interest in this book.

  9. Simulator platform for fast reactor operation and safety technology demonstration

    International Nuclear Information System (INIS)

    Vilim, R.B.; Park, Y.S.; Grandy, C.; Belch, H.; Dworzanski, P.; Misterka, J.

    2012-01-01

    A simulator platform for visualization and demonstration of innovative concepts in fast reactor technology is described. The objective is to make more accessible the workings of fast reactor technology innovations and to do so in a human factors environment that uses state-of-the art visualization technologies. In this work the computer codes in use at Argonne National Laboratory (ANL) for the design of fast reactor systems are being integrated to run on this platform. This includes linking reactor systems codes with mechanical structures codes and using advanced graphics to depict the thermo-hydraulic-structure interactions that give rise to an inherently safe response to upsets. It also includes visualization of mechanical systems operation including advanced concepts that make use of robotics for operations, in-service inspection, and maintenance.

  10. Simulator platform for fast reactor operation and safety technology demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Vilim, R. B.; Park, Y. S.; Grandy, C.; Belch, H.; Dworzanski, P.; Misterka, J. (Nuclear Engineering Division)

    2012-07-30

    A simulator platform for visualization and demonstration of innovative concepts in fast reactor technology is described. The objective is to make more accessible the workings of fast reactor technology innovations and to do so in a human factors environment that uses state-of-the art visualization technologies. In this work the computer codes in use at Argonne National Laboratory (ANL) for the design of fast reactor systems are being integrated to run on this platform. This includes linking reactor systems codes with mechanical structures codes and using advanced graphics to depict the thermo-hydraulic-structure interactions that give rise to an inherently safe response to upsets. It also includes visualization of mechanical systems operation including advanced concepts that make use of robotics for operations, in-service inspection, and maintenance.

  11. Course of operators of the RA-3 reactor

    International Nuclear Information System (INIS)

    Caligiuri, G.A.

    1983-01-01

    Description of the fundamental principles of the nuclear reactors' control systems. The RA-3 reactor's control and measurement systems are principally described, without setting aside the basic criteria for the design of an appropriate instrumentation for the control of a nuclear reactor, as well as the theory on which the functioning of the several detectors and equipments used in a nuclear instrumentation are based. The main purpose of this course is that of serving, preferentially as a text, for the training of personnel which shall perform operation tasks in this reactor. The work includes three well-defined sections. The first two ones make an introduction to the subject, while the third one, extending to more than half-work, deals with the general description of the system in which the control and operation logic of RA-3 are included. (R.J.S) [es

  12. Optimal processor for malfunction detection in operating nuclear reactor

    International Nuclear Information System (INIS)

    Ciftcioglu, O.

    1990-01-01

    An optimal processor for diagnosing operational transients in a nuclear reactor is described. Basic design of the processor involves real-time processing of noise signal obtained from a particular in core sensor and the optimality is based on minimum alarm failure in contrast to minimum false alarm criterion from the safe and reliable plant operation viewpoint

  13. Some particular problems put by operating experimental reactors

    International Nuclear Information System (INIS)

    Candiotti, C.; Mabeix, R.; Uguen, R.

    1960-01-01

    On basis of a six years experience in operating research reactors, the authors explain, first, the difference in their utilization between these piles and another similar ones and, after, in consequence, they set off corresponding servitudes. These servitudes put very particular problems in operating itself, maintenance, modifications or additions on these apparatus. (author) [fr

  14. Decentralization of operating reactor licensing reviews: NRR Pilot Program

    International Nuclear Information System (INIS)

    Hannon, J.N.

    1984-07-01

    This report, which has incorporated comments received from the Commission and ACRS, describes the program for decentralization of selected operating reactor licensing technical review activities. The 2-year pilot program will be reviewed to verify that safety is enhanced as anticipated by the incorporation of prescribed management techniques and application of resources. If the program fails to operate as designed, it will be terminated

  15. Technical evolution and operation of French CO2 cooled reactors (UNGG)

    International Nuclear Information System (INIS)

    Berthion, Y.

    1986-10-01

    The technical evolution of the five French CO 2 cooled reactors (UNGG) from 1981 to 1986 needs to be outlined. These technical evolutions concerned the fuel element of Bugey 1 which is now slightly enriched, as well as the load reduction operation required by the grid. In addition work in underway to increase the safety at the two St Laurent units, or to repair the hot steel upper-structures of Chinon-3 unit

  16. The next 20 years operation of the 36 years old Hungarian training reactor

    International Nuclear Information System (INIS)

    Aszodi, A.

    2007-01-01

    Hungary prepares for extending the design lifetime of the four VVER-440/213 type units; in that case they will finish operation between 2032 and 2037. Discussion on possible new nuclear units in Hungary was recently commenced. The paper describes actions in human resource management and knowledge management, and also the new safety analysis methods which were applied during the recent Periodic Safety Review of the Hungarian Training Reactor

  17. NSSS design and cycle 1 operating history data for Arkansas Nuclear One, Unit-2. Final report

    International Nuclear Information System (INIS)

    Gagne, P.A.

    1981-03-01

    This report contains design and cycle 1 operating data for the Arkansas Nuclear One, Unit-2 nuclear steam supply system. The design data include descriptions of the reactor core, reactor coolant system, and control systems which are a part of the nuclear steam supply system. Operating history data are provided for the period of December 1978 through January 1980. The most important operating history data provided include reactor power, cumulative fuel burnup, control rod position, primary coolant temperature, and a series of power distribution state points

  18. Training reactor operators and shift supervisors

    International Nuclear Information System (INIS)

    Schwarz, O.

    1980-01-01

    To establish a central institution run by power plant operators to harmonize the training of power plant operating personnel was raised, and put into practice, quite early in the Federal Republic of Germany. A committee devoted to training plant crews, which had been set up by the organizations of German electricity utilities responsible for operating power plants, was changed into a Kraftwerksschule e.V. (Power Plant School) in 1963. This school runs training courses, along standard lines, for operating personnel of thermal power plants, especially for operators and power plant supervisors, in close cooperation with power plant operators. As the peaceful utilization of nuclear energy expanded, also the training of nuclear power plant operators was included in 1969. Since September 1977, the center has had a simulator of a PWR nuclear power plant, since January 1978 also that of a BWR plant available for training purposes. Besides routine operation the trainees also learn to control those incidents which occur only very rarely in real nuclear power plants. (orig./UA) [de

  19. Reactivity monitoring during reactor-reloading operations

    International Nuclear Information System (INIS)

    Baumann, N.P.; Ahlfeld, C.F.; Ridgely, G.C.

    1983-01-01

    At the Savannah River Plant (SRP) reloading operations during shutdown present special considerations in reactivity monitoring and control. Large reactivity changes may occur during reloading operations because of the heterogeneous nature of some core designs. This paper describes an improved monitoring system

  20. Operation of the SLOWPOKE-2 reactor in Jamaica

    Energy Technology Data Exchange (ETDEWEB)

    Grant, C.N.; Lalor, G.C.; Vuchkov, M.K. [University of the West Indies, Kingston (Jamaica)

    2001-07-01

    Over the past sixteen years lCENS has operated a SLOWPOKE 2 nuclear reactor almost exclusively for the purpose of neutron activation analysis. During this period we have adopted a strategy of minimum irradiation times while optimizing our output in an effort to increase the lifetime of the reactor core and to maintaining fuel integrity. An inter-comparison study with results obtained with a much larger reactor at IPEN has validated this approach. The parameters routinely monitored at ICENS are also discussed and the method used to predict the next shim adjustment. (author)

  1. Towards commercial fast breeder reactors the first 1200 MWe unit

    International Nuclear Information System (INIS)

    Banal, M.; Carle, R.

    The public probably thinks of these fast breeder reactors in terms of their rising unit capacity: RAPSODIE 20 MW (thermal), raised to 40 MW, PHENIX 25 MWe, and now 1200 MWe. However, the purposes of the project and the framework of construction have been fundamentally different in each case. Design parameters and the development program of the LMFBR are presented. (auth)

  2. Method of operating a water-cooled nuclear reactor

    International Nuclear Information System (INIS)

    Lysell, G.

    1975-01-01

    When operating a water-cooled nuclear reactor, in which the fuel rods consist of zirconium alloy tubes containing an oxidic nuclear fuel, stress corrosion in the tubes can be reduced or avoided if the power of the reactor is temporarily increased so much that the thermal expansion of the nuclear fuel produces a flow of the material in the tube. After that temporary power increase the power output is reduced to the normal power

  3. Study on operational aspect of natural circulation HLMC reactor (1)

    International Nuclear Information System (INIS)

    Sienicki, J.J.; Cahalan, J.E.; Spencer, B.W.

    2000-08-01

    The concept of a heavy liquid metal cooled fast reactor that achieves 100% natural circulation heat removal from the core has the potential to attain improved cost competitiveness through extreme simplification, proliferation resistance, and heightened passive safety. The concept offers the potential for simplifications in plant control strategies wherein inherent reactor feedbacks may restore balance between energy release and heat removal from the reactor during operation as well as providing passive reactivity shutdown in the event of transients involving failure to scram. This study was initiated to evaluate the operational characteristics of the 100% natural circulation reactor under normal and transient states using a plant dynamics analysis computer code and to seek design and operational optimization of the concept. In the current Phase I of the project, the stage for the overall study has been prepared. A coupled thermal hydraulics-kinetics plant dynamics analysis code has been developed/modified that has the capabilities to calculate operational and accident transients. Code input has been prepared for the heavy liquid metal cooled natural circulation reactor concept. A preliminary analysis using the plant dynamics code and its input to calculate three illustrative cases relevant to initial startup, shutdown following long-term operation, and change in turbine load demonstrates the capability to analyze typical transient cases. (author)

  4. Operation experience with the TRIGA reactor Wien 2004

    International Nuclear Information System (INIS)

    Boeck, H.; Villa, M.

    2004-01-01

    The TRIGA Mark-II reactor in Vienna is now in operation for more than 42 years. The average operation time is about 230 days per year with 90 % of this time at nominal power of 250 kW. The remaining 10 % operation time is used for students' training courses at low power level. Pulse operation is rather infrequent with about 5 to 10 pulses per year. The utilization of this facility is excellent, the number of students participating in practical exercises has strongly increased, and also training courses for outside groups such as the IAEA or for the 2004 Eugene Wigner Course are using the reactor, because it is the only TRIGA reactor remaining in Austria. Therefore, there is no need for decommissioning and it is intended to operate it as long as possible into the next decade. Nevertheless, in early 2004 it was decided to prepare a report on a decommissioning procedure for a typical TRIGA Mark II reactor which lists the volumes, the activity and the weight of individual materials such as concrete, aluminium, stainless steel, graphite and others which will accumulate during this process (a summary of possible activated and contaminated materials and the activity of a single TRIGA fuel element as a function of fuel type and decay time in Bq is presented). The status of the reactor (instrumentation, fuel elements, cooling circuit, ventilation system, re-inspection and maintenance program, cost/benefit) is outlined. (nevyjel)

  5. Gas Reactor International Cooperative Program. Interim report. Construction and operating experience of selected European Gas-Cooled Reactors

    International Nuclear Information System (INIS)

    1978-09-01

    The construction and operating experience of selected European Gas-Cooled Reactors is summarized along with technical descriptions of the plants. Included in the report are the AVR Experimental Pebble Bed Reactor, the Dragon Reactor, AGR Reactors, and the Thorium High Temperature Reactor (THTR). The study demonstrates that the European experience has been favorable and forms a good foundation for the development of Advanced High Temperature Reactors

  6. Operation of the High Flux Reactor. Annual report 1985

    International Nuclear Information System (INIS)

    1985-01-01

    This year was characterized by the end of a major rebuilding of the installation during which the reactor vessel and its peripheral components were replaced by new and redesigned equipment. Both operational safety and experimental use were largely improved by the replacement. The reactor went back to routine operation on February 14, 1985, and has been operating without problem since then. All performance parameters were met. Other upgrading actions started during the year concerned new heat exchangers and improvements to the reactor building complex. The experimental load of the High Flux Reactor reached a satisfactory level with an average of 57%. New developments aimed at future safety related irradiation tests and at novel applications of neutrons from the horizontal beam tubes. A unique remote encapsulation hot cell facility became available adding new possibilities for fast breeder fuel testing and for intermediate specimen examination. The HFR Programme hosted an international meeting on development and use of reduced enrichment fuel for research reactors. All aspects of core physics, manufacture technology, and licensing of novel, proliferation-free, research reactor fuel were debated

  7. Advanced CANDU reactor design for operability

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Lalonde, R.; Soulard, M.

    2003-01-01

    This paper outlines design features and engineering processes in the ACR TM development program which contribute to excellence in performance and low operating cost. AECL recognizes that future plant owners will place a high priority in these operational characteristics. A successful next generation plant will have a best-in-class capability, both in its design characteristics, in the engineering philosophy and program adopted during the product development, and in the vendor's approach to operating station support. The ACR program addresses each of these drivers. Operability considerations are built-in to the design at an overall, plant wide level. For example, based on the strong CANDU 6 operating record, targets for standard outage duration, time between outages and component durability are set, while the design engineering is managed to achieve these targets. The ultimate maintenance target for the ACR, once initial operating experience has been gained, is to operate with a 21-day standard maintenance outage at an interval of once every three years. At the detailed design level, close attention is paid to space allocation, to enable good maintenance access. Selection of components also places emphasis on maintainability based on the extensive and current experience with CANDU projects. (author)

  8. Operation of staged membrane oxidation reactor systems

    Science.gov (United States)

    Repasky, John Michael

    2012-10-16

    A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

  9. Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20

    International Nuclear Information System (INIS)

    1996-06-01

    The US Nuclear Regulatory Commission's monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided

  10. Operational limits and conditions and operating procedures for research reactors. Safety guide

    International Nuclear Information System (INIS)

    2008-01-01

    This publication provides practical guidance on all important aspects of developing, formulating and presenting the operational limits and conditions as well as the operating procedures for research reactors. It covers the concept of operational limits and conditions, their content, and the responsibilities of the operating organization with respect to their establishment, modification, documentation and compliance. The guidance also covers the training of operating personnel on performing periodic testing, established by the operational limits and conditions, and operating procedures

  11. A continuing success - The United States Foreign Research Reactor Spent Nuclear Fuel Acceptance Program

    International Nuclear Information System (INIS)

    Mustin, Tracy P.; Clapper, Maureen; Reilly, Jill E.

    2000-01-01

    The United States Department of Energy, in consultation with the Department of State, adopted the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel in May 1996. To date, the Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program, established under this policy, has completed 16 spent fuel shipments. 2,651 material test reactor (MTR) assemblies, one Slowpoke core containing less than 1 kilogram of U.S.-origin enriched uranium, 824 Training, Research, Isotope, General Atomic (TRIGA) rods, and 267 TRIGA pins from research reactors around the world have been shipped to the United States so far under this program. As the FRR SNF Acceptance Program progresses into the fifth year of implementation, a second U.S. cross country shipment has been completed, as well as a second overland truck shipment from Canada. Both the cross country shipment and the Canadian shipment were safely and successfully completed, increasing our knowledge and experience in these types of shipments. In addition, two other shipments were completed since last year's RERTR meeting. Other program activities since the last meeting included: taking pre-emptive steps to avoid license amendment pitfalls/showstoppers for spent fuel casks, publication of a revision to the Record of Decision allowing up to 16 casks per ocean going vessel, and the issuance of a cable to 16 of the 41 eligible countries reminding their governments and the reactor operators that the U.S.-origin uranium in their research reactors may be eligible for return to the United States under the Acceptance Program and urging them to begin discussions on shipping schedules. The FRR SNF program has also supported the Department's implementation of the competitive pricing policy for uranium and resumption of shipments of fresh uranium for fabrication into assemblies for research reactors. The United States Foreign Research Reactor Spent Nuclear Fuel Acceptance Program continues

  12. Artificial Intelligence and its Reasonable Application Scenario to Reactor Operation

    International Nuclear Information System (INIS)

    Im, Ki Hong; Suh, Yong-Suk; Park, Cheol; Lim, In-Cheol

    2017-01-01

    This paper presents brief but reasonable scenarios for applying AI or machine learning technologies to research reactor from various perspectives. Two less safety critical scenarios for applying AI to reactor operation are introduced in this study. However, the AI assistant will not only be an assistant but it will also be an operator in the future. What is required is big operation data which can represent all the cases requiring operation decision, including normal operation and accident data as well, and enough time to train and fix the AI system with this data. We can predict AI study in this area can begin with a mild and safe application. But in the near future, this technology could be used to handle or automate more severe operations.

  13. Evaluating Russian space nuclear reactor technology for United States applications

    International Nuclear Information System (INIS)

    Polansky, G.F.; Schmidt, G.L.; Voss, S.S.; Reynolds, E.L.

    1994-01-01

    Space nuclear power and nuclear electric propulsion are considered important technologies for planetary exploration, as well as selected earth orbit applications. The Nuclear Electric Propulsion Space Test Program (NEPSTP) was intended to provide an early flight demonstration of these technologies at relatively low cost through extensive use of existing Russian technology. The key element of Russian technology employed in the program was the Topaz II reactor. Refocusing of the activities of the Ballistic Missile Defense Organization (BMDO), combined with budgetary pressures, forced the cancellation of the NEPSTP at the end of the 1993 fiscal year. The NEPSTP was faced with many unique flight qualification issues. In general, the launch of a spacecraft employing a nuclear reactor power system complicates many spacecraft qualification activities. However, the NEPSTP activities were further complicated because the reactor power system was a Russian design. Therefore, this program considered not only the unique flight qualification issues associated with space nuclear power, but also with differences between Russian and United States flight qualification procedures. This paper presents an overview of the NEPSTP. The program goals, the proposed mission, the spacecraft, and the Topaz II space nuclear power system are described. The subject of flight qualification is examined and the inherent difficulties of qualifying a space reactor are described. The differences between United States and Russian flight qualification procedures are explored. A plan is then described that was developed to determine an appropriate flight qualification program for the Topaz II reactor to support a possible NEPSTP launch

  14. Development of operator thinking model and its application to nuclear reactor plant operation system

    International Nuclear Information System (INIS)

    Miki, Tetsushi; Endou, Akira; Himeno, Yoshiaki

    1992-01-01

    At first, this paper presents the developing method of an operator thinking model and the outline of the developed model. In next, it describes the nuclear reactor plant operation system which has been developed based on this model. Finally, it has been confirmed that the method described in this paper is very effective in order to construct expert systems which replace the reactor operator's role with AI (artificial intelligence) systems. (author)

  15. RA Research reactor, Annual report 1970 - Operation and maintenance

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1970-12-01

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  16. Can a nuclear reactor operate for 100 years?

    International Nuclear Information System (INIS)

    Hertel, O.

    2010-01-01

    The TWR (Travelling Wave Reactor) concept was invented in the fifties, then forgotten and it reappeared in 2001 but it was considered too immature to be selected for the fourth generation of nuclear reactors, now an American company 'Terrapower' proposes one whose design is given in the article. This TWR operates with depleted uranium, only the lower part of the fuel rod involves uranium fuel with a civil enrichment ratio (less that 20%). The lower part of the fuel will ignite the fission reaction and enrich the part of fuel just above through neutron absorption. The burning part of the fuel will move up progressively. The main advantage of this reactor is that it can operate for decades without maintenance nor fuel loading. The principle is right on the paper but requires huge technological work to select materials and systems that will be able to withstand decades of operation time in harsh conditions. (A.C.)

  17. Optimal distribution of reactivity excess in a system of reactors operating at a variable loading schedule

    International Nuclear Information System (INIS)

    Bolsunov, A.A.; Zagrebaev, A.M.; Naumov, V.I.

    1979-01-01

    Considered is the task of reactivity excess distribution optimization in the system of reactors for the purpose of minimazing the summary power production losses at the fixed loading schedule. Mathematical formulation of the task is presented. Given are the curves, characterizing the dependence of possible degree of the reactor power drop on reactivity excees for non-stationary Xe poisoning at different nominal density of neutron flux. Analyzing the results, it is concluded that in case, when the reactors differ only in neutron flux density the reactor with lower neutron flux density should be involved in the variable operation schedule first as the poisoning of this reactor will be less, and therefore, the losses of the system power production will be less. It is advisable to reserve the reactivity excess in the reactor with greater power or in the reactor with higher burnup rate. It is stressed that the obtained results of the optimization task solution point out the possibility of obtaining the certain ecomonic effect and permit to correct the requirements on mobility of separate power units at system approach to NPP operation in a variable loading schedule

  18. Control rod for the operation of nuclear reactor

    International Nuclear Information System (INIS)

    Ishida, Hiromi

    1987-01-01

    Purpose: To conduct spectrum shift operation without complicating the reactor core structures, reducing the probability of failures. Constitution: An operation control rod which is driven while passed vertically in the reactor core comprises a strong absorption portion, moderation portion and weak moderation portion defined orderly from above to below and the length for each of the portions is greater than the effective reactor core height. If the operation control rod is lifted to the maximum limit in the upward direction of the reactor core, the weak moderation portion is corresponded over the effective length of the reactor core. Since the weak moderation portion is filled with zirconium and moderators are not present in the operation control rod, water draining gap is formed, neutron spectral shift is formed, excess reactivity is suppressed, absorption of neutrons to fuel fertile material is increased and the formation of nuclear fission material is increased. From the middle to the final stage of the cycle, the control rod is lowered, by which the moderator/fuel effective volume ratio is increased to increase the reactivity. (Kamimura, M.)

  19. Sustainability management for operating organizations of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo; Aquino, Afonso Rodrigues de, E-mail: ekibrit@ipen.br, E-mail: araquino@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNE-SP), Sao Paulo, SP (Brazil)

    2017-07-01

    Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs. In a country like Brazil, where nuclear activity is geared towards peaceful purposes, any operating organization of research reactor should emphasize its commitment to social, environmental, economic and institutional aspects. Social aspects include research and development, production and supply of radiopharmaceuticals, radiation safety and special training for the nuclear sector. Environmental aspects include control of the surroundings and knowledge directed towards environment preservation. Economic aspects include import substitution and diversification of production. Institutional aspects include technology, innovation and knowledge. These aspects, if considered in the management system of an operating organization of research reactor, will help with its long-term maintenance and success in an increasingly competitive market scenario. About this, we propose a sustainability management system approach for operating organizations of research reactors. A bibliographical review on the theme is made. A methodology for identifying indicators for measuring sustainability in nuclear research reactors processes is also described. Finally, we propose a methodology for sustainability perception assessment to be applied at operating organizations of research reactors. (author)

  20. Sustainability management for operating organizations of research reactors

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Aquino, Afonso Rodrigues de

    2017-01-01

    Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs. In a country like Brazil, where nuclear activity is geared towards peaceful purposes, any operating organization of research reactor should emphasize its commitment to social, environmental, economic and institutional aspects. Social aspects include research and development, production and supply of radiopharmaceuticals, radiation safety and special training for the nuclear sector. Environmental aspects include control of the surroundings and knowledge directed towards environment preservation. Economic aspects include import substitution and diversification of production. Institutional aspects include technology, innovation and knowledge. These aspects, if considered in the management system of an operating organization of research reactor, will help with its long-term maintenance and success in an increasingly competitive market scenario. About this, we propose a sustainability management system approach for operating organizations of research reactors. A bibliographical review on the theme is made. A methodology for identifying indicators for measuring sustainability in nuclear research reactors processes is also described. Finally, we propose a methodology for sustainability perception assessment to be applied at operating organizations of research reactors. (author)

  1. Characteristics of potential repository wastes: Volume 4, Appendix 4A, Nuclear reactors at educational institutions of the United States; Appendix 4B, Data sheets for nuclear reactors at educational institutions; Appendix 4C, Supplemental data for Fort St. Vrain spent fuel; Appendix 4D, Supplemental data for Peach Bottom 1 spent fuel; Appendix 4E, Supplemental data for Fast Flux Test Facility

    International Nuclear Information System (INIS)

    1992-07-01

    Volume 4 contains the following appendices: nuclear reactors at educational institutions in the United States; data sheets for nuclear reactors at educational institutions in the United States(operational reactors and shut-down reactors); supplemental data for Fort St. Vrain spent fuel; supplemental data for Peach Bottom 1 spent fuel; and supplemental data for Fast Flux Test Facility

  2. Designing visual displays and system models for safe reactor operations

    Energy Technology Data Exchange (ETDEWEB)

    Brown-VanHoozer, S.A.

    1995-12-31

    The material presented in this paper is based on two studies involving the design of visual displays and the user`s prospective model of a system. The studies involve a methodology known as Neuro-Linguistic Programming and its use in expanding design choices from the operator`s perspective image. The contents of this paper focuses on the studies and how they are applicable to the safety of operating reactors.

  3. A review of healthy condition for reactor operators of NPP

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhu Lixin; Zhou Limin

    2008-01-01

    Physical health is one of fundamental elements and the necessary qualification for holding operator license or senior operator license of a nuclear power plant issued by NNSA. Based upon requirements for healthy qualification of reactor operators in nuclear safety regulations and some new issued regulations, especially some involved national standard (GB), review direction, relevant contents and criteria were described, and some suggestions were provided in this paper. (authors)

  4. Operation and control of high density tokamak reactors

    International Nuclear Information System (INIS)

    Attenberger, S.E.; McAlees, D.G.

    1976-01-01

    The incentive for high density operation of a tokamak reactor is discussed. The plasma size required to attain ignition is determined. Ignition is found to be possible in a relatively small system provided other design criteria are met. These criteria are described and the technology developments and operating procedures required by them are outlined. The parameters for such a system and its dynamic behavior during the operating cycle are also discussed

  5. Operation and maintenance of the RB reactor, Annual report for 1977

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1977-01-01

    The annual report for 1977 includes the following: utilization of the RB reactor; new regulations and instructions for reactor operation; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Five annexes are concerned with: testing the properties of preamplifiers for linear and logarithmic experimental channels; properties of the neutron converter; maintenance of the reactor equipment; purchase of new equipment; and the program for training reactor operators

  6. Unpacking Referent Units in Fraction Operations

    Science.gov (United States)

    Philipp, Randolph A.; Hawthorne, Casey

    2015-01-01

    Although fraction operations are procedurally straightforward, they are complex, because they require learners to conceptualize different units and view quantities in multiple ways. Prospective secondary school teachers sometimes provide an algebraic explanation for inverting and multiplying when dividing fractions. That authors of this article…

  7. Preparing nuclear power plant units for operation

    International Nuclear Information System (INIS)

    Hudcovic, R.; Telgarsky, K.; Kmosena, J.

    1984-01-01

    The factors are listed which have to be taken into consideration for planning the unit operation, i.e., the implementation of planned repairs, checks of equipment and refuellings. All basic input data were evaluated as the basic for drawing up the schedule of routine repairs and overhauls for the coming period. (E.S.)

  8. Communication links for fusion reactor maintenance operations

    International Nuclear Information System (INIS)

    Van Uffelen, M.

    2005-01-01

    Different architectures are envisaged for data transmission with fibre optic links in a radiation environment, as proposed in literature for both space and high energy physics applications. Their needs and constraints differ from those encountered for maintenance tasks in the future ITER environment, not only in terms of temperature and radiation levels, but also with respect to transmission speed requirements. Our approach attempts to limit the use of radiation-sensitive electronics for transmission of both digital and/or analogue data to the control room, using glass fibres as transport medium. We therefore assessed the radiation behaviour of a cost-effective fibre optic transmitter at 850 nm, consisting of a PWM (pulse width modulator), a radiation tolerant current driver (previously developed at SCK-CEN) and a VCSEL (Vertical-Cavity Surface Emitting Laser assembly, up to 10 MGy at 60 degrees Celsius. The PWM enables to transform an analogue sensor signal into a pseudo numerical signal, with a pulse width proportional to the incoming signal. The main objective of this task is to contribute to the major design of the maintenance equipment and strategy needed for the remote replacement of the divertor system in the future ITER fusion reactor, with particular attention to the implications of radiation hardening rules and recommendations. Next to the radiation assessment studies of remote handling tools, including actuators and sensors, we also develop radiation tolerant communication links with multiplexing capabilities

  9. A logic scheme for regulating safe operation of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, E E [Reactor Department, Nuclear Research Center, Atomic Energy Authority, Cairo (Egypt); Effat, A; Rahman, F A [Operational Saety Dept, National Center of Nuclear Safety and Radiation Control Atomic Energy Authority, Cairo (Egypt)

    1997-12-31

    This investigation presents a logic scheme for regulating the safe operation of research reactor in accordance with the new revision of SS-35 and revised by the 10 CFR. It emphasizes the regulatory inspection and enforcement (RI end E) during the reactor operation phase. IT is developed to provide information, guidance and recommendations to be taken when constructing the RI and E program that could be applied to the operational phase of the egyptian Research Reactors. In the operational phase, the regulatory inspection (RI) means an examination, observation, measurement, or test undertaken or on behalf of the nuclear regulatory body (NRB) during operation to verify that the nuclear materials, components, systems and structures as well operational activities, processes, procedures and personnel competence and performance are in accordance with the requirements established or the provisions approved by NRB or specified in the operational license or contained in regulations. Regulatory inspection includes both routine and non-routine ones. Any of them may be announced or unannounced. The problems identified by the RI must be resolved by the proper RE actions. The RE actions include investigative and corrective RE actions. These RI and E procedures for regulating safe operation of research reactors are presented as flow charts and then developed as a computer logic scheme. The software program is very efficient, very friendly, very simple and is interactive in nature such that the program asks the user certain questions about essential steps that guide the (RI and E) for research reactors, and user responds. The program proceeds based on this response until all the necessary steps for (RI and E) are accomplished. 5 figs.

  10. AMNT 2014. Key topic: Reactor operation, safety - report. Pt. 3

    Energy Technology Data Exchange (ETDEWEB)

    Bohnstedt, Angelika [Karlsruher Institut fuer Technologie (KIT), Eggenstein-Leopoldshafen (Germany). Programm Nukleare Sicherheitsforschung (NUKLEAR); Mull, Thomas [AREVA GmbH, Erlangen (Germany). Nuclear Fusion, HTR and Transverse Issues (PTDH-G); Starflinger, Joerg [Stuttgart Univ. (Germany). Inst. fuer Kernenergetik und Energiesysteme (IKE)

    2015-01-15

    Summary report on the following sessions of the Annual Conference on Nuclear Technology held in Frankfurt, 6 to 8 May 2014: - Reactor Operation, Safety: Radiation Protection (Angelika Bohnstedt); - Competence, Innovation, Regulation: Fusion Technology - Optimisation Steps in the ITER Design (Thomas Mull); - Competence, Innovation, Regulation: Education, Expert Knowledge, Knowledge Transfer (Joerg Starflinger). The other Sessions of the Key Topics 'Reactor Operation, Safety', 'Competence, Innovation, Regulation' and 'Fuel, Decommissioning and Disposal' have been covered in atw 10 and 12 (2015) and will be covered in further issues of atw.

  11. Method of operating water cooled reactor with blanket

    International Nuclear Information System (INIS)

    Suzuki, Katsuo.

    1988-01-01

    Purpose: To increase the production amount of fissionable plutonium by increasing the burnup degree of blanket fuels in a water cooled reactor with blanket. Method: Incore insertion assemblies comprising water elimination rods, fertile material rods or burnable poison rods are inserted to those fuel assemblies at the central portion of the reactor core that are situated at the positions not inserted with control rods in the earlier half of the operation cycle, while the incore reactor insertion assemblies are withdrawn at the latter half of the operation cycle of a nuclear reactor. As a result, it is possible to increase the power share of the blanket fuels and increase the fuel burnup degree to thereby increase the production amount of fissionable plutonium. Furthermore, at the initial stage of the cycle, the excess reactivity of the reactor can be suppressed to decrease the reactivity control share on the control rod. At the final stage of the cycle, the excess reactivity of the reactor core can be increased to improve the cycle life. (Kamimura, M.)

  12. Operating performance of LWR nuclear generating units

    International Nuclear Information System (INIS)

    Pia, S.

    1984-01-01

    This work aims at reviewing, on the basis of historical data, the operational problem areas which explain the degree of availability and productivity achieved up to now by nuclear power plants in commercial operation in the world. The operating performance data of nuclear power plants area analysed with respect to plant type, size and other significant reference parameters and they are evaluated also by comparison with fossil generating unit data. Major performance indices data are presented for both nuclear and fossil units type and distribution of outage causes. Unplanned full outages caused by nuclear power plant equipment and components failure are particulary emphasized. The trend for unplanned full outages due to the failure of components shows decreasing numerical values in 1981 with respect to the previous years. But this result should be weighed with the increasing plant unavailability hours needed for maintenance and repair action (chiefly preventive maintenance on critical components). This means that the number and downtime of forced outage must be drastically reduced for economic reasons (production losses and problems associated with the unavailable unit unplanned replacement) as well as for plant safe and reliable operation (sudden unavailability of key components and frequency of transients associated with plant shutdown and routine startup operation)

  13. New digital control system for the operation of the Colombian research reactor IAN-R1

    International Nuclear Information System (INIS)

    Celis del A, L.; Rivero, T.; Bucio, F.; Ramirez, R.; Segovia, A.; Palacios, J.

    2015-09-01

    En 2011, Mexico won the Colombian international tender for the renewal of instrumentation and control of the IAN-R1 Reactor, to Argentina and the United States. This paper presents the design criteria and the development made for the new digital control system installed in the Colombian nuclear reactor IAN-R1, which is based on a redundant and diverse architecture, which provides increased availability, reliability and safety in the reactor operation. This control system and associated instrumentation met all national export requirements, with the safety requirements established by the IAEA as well as the requirements demanded by the Colombian Regulatory Body in nuclear matter. On August 20, 2012, the Colombian IAN-R1 reactor reached its first criticality controlled with the new system developed at Instituto Nacional de Investigaciones Nucleares (ININ). On September 14, 2012, the new control system of the Colombian IAN-R1 reactor was officially handed over to the Colombian authorities, this being the first time that Mexico exported nuclear technology through the ININ. Currently the reactor is operating successfully with the new control system, and has an operating license for 5 years. (Author)

  14. Design and simulation of an activated sludge unit associated to a continuous reactor to remove heavy metals

    Energy Technology Data Exchange (ETDEWEB)

    D`Avila, J.S.; Nascimento, R.R. [Ambientec Consultoria Ltda., Aracaju, SE (Brazil)

    1993-12-31

    A software was developed to design and simulate an activated sludge unit associated to a new technology to remove heavy metals from wastewater. In this process, a continuous high efficiency biphasic reactor operates by using particles of activated peat in conjugation with the sludge unit. The results obtained may be useful to increase the efficiency or to reduce the design and operational costs involved in a activated sludge unit. (author). 5 refs., 2 tabs.

  15. Design and simulation of an activated sludge unit associated to a continuous reactor to remove heavy metals

    Energy Technology Data Exchange (ETDEWEB)

    D` Avila, J S; Nascimento, R R [Ambientec Consultoria Ltda., Aracaju, SE (Brazil)

    1994-12-31

    A software was developed to design and simulate an activated sludge unit associated to a new technology to remove heavy metals from wastewater. In this process, a continuous high efficiency biphasic reactor operates by using particles of activated peat in conjugation with the sludge unit. The results obtained may be useful to increase the efficiency or to reduce the design and operational costs involved in a activated sludge unit. (author). 5 refs., 2 tabs.

  16. Measurement of delayed neutron-emitting fission products in nuclear reactor coolant water during reactor operation

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    The method covers the detection and measurement of delayed neutron-emitting fission products contained in nuclear reactor coolant water while the reactor is operating. The method is limited to the measurement of the delayed neutron-emitting bromine isotope of mass 87 and the delayed neutron-emitting iodine isotope of mass 137. The other delayed neutron-emitting fission products cannot be accurately distinguished from nitrogen 17, which is formed under some reactor conditions by neutron irradiation of the coolant water molecules. The method includes a description of significance, measurement variables, interferences, apparatus, sampling, calibration, standardization, sample measurement procedures, system efficiency determination, calculations, and precision

  17. Development of Advanced Monitoring System with Reactor Neutrino Detection Technique for Verification of Reactor Operations

    International Nuclear Information System (INIS)

    Furuta, H.; Tadokoro, H.; Imura, A.; Furuta, Y.; Suekane, F.

    2010-01-01

    Recently, technique of Gadolinium-loaded liquid scintillator (Gd-LS) for reactor neutrino oscillation experiments has attracted attention as a monitor of reactor operation and ''nuclear Gain (GA)'' for IAEA safeguards. When the thermal operation power is known, it is, in principle, possible to non-destructively measure the ratio of Pu/U in reactor fuel under operation from the reactor neutrino flux. An experimental program led by Lawrence Livermore National Laboratory and Sandia National Laboratories in USA has already demonstrated feasibility of the reactor monitoring by neutrinos at San Onofre Nuclear Power Station, and the Pu monitoring by neutrino detection is recognized as a candidate of novel technology to detect undeclared operation of reactor. However, further R and D studies of detector design and materials are still necessary to realize compact and mobile detector for practical use of neutrino detector. Considering the neutrino interaction cross-section and compact detector size, the detector must be set at a short distance (a few tens of meters) from reactor core to accumulate enough statistics for monitoring. In addition, although previous reactor neutrino experiments were performed at underground to reduce cosmic ray muon background, feasibility of the measurement at ground level is required for the monitor considering limited access to the reactor site. Therefore, the detector must be designed to be able to reduce external backgrounds extremely without huge shields at ground level, eg. cosmic ray muons and fast neutrons. We constructed a 0.76 ton Gd-LS detector, and carried out a reactor neutrino measurement at the experimental fast reactor JOYO in 2007. The neutrino detector was set up at 24.3m away from the reactor core at the ground level, and we understood the property of the main background; the cosmic-ray induced fast neutron, well. Based on the experience, we are constructing a new detector for the next experiment. The detector is a Gd

  18. Operating history report for the Peach Bottom HTGR. Volume I. Reactor operating history

    International Nuclear Information System (INIS)

    Scheffel, W.J.; Baldwin, N.L.; Tomlin, R.W.

    1976-01-01

    The operating history for the Peach Bottom-1 Reactor is presented for the years 1966 through 1975. Information concerning general chemistry data, general physics data, location of sensing elements in the primary helium circuit, and postirradiation examination and testing of reactor components is presented

  19. Computer codes for the operational control of the research reactors

    International Nuclear Information System (INIS)

    Kalker, K.J.; Nabbi, R.; Bormann, H.J.

    1986-01-01

    Four small computer codes developed by ZFR are presented, which have been used for several years during operation of the research reactors FRJ-1, FRJ-2, AVR (all in Juelich) and DR-2 (Riso, Denmark). Because of interest coming from the other reactor stations the codes are documented within the frame work of the IAEA Research Contract No. 3634/FG. The zero-dimensional burnup program CREMAT is used for reactor cores in which flux measurements at each individual fuel element are carried out during operation. The program yields burnup data for each fuel element and for the whole core. On the basis of these data, fuel reloading is prepared for the next operational period under consideration of the permitted minimum shut down reactivity of the system. The program BURNY calculates burnup for fuel elements inaccessible for flux measurements, but for which 'position weighting factors' have been measured/calculated during zero power operation of the core, and which are assumed to be constant in all operational situations. The code CURIAX calculates post-irradiation data for discharged fuel elements needed in their manipulation and transport. These three programs have been written for highly enriched fuel and take into account U-235 only. The modification of CREMAT for LEU Cores and its combiantion with ORIGEN is in preparation. KINIK is an inverse kinetic code and widely used for absorber rod calibration at the abovementioned research reactors. It includes a special polynomial subroutine which can easily be used in other codes. (orig.) [de

  20. The operating reliability of the reactor coolant pump

    International Nuclear Information System (INIS)

    Grancy, W.

    1996-01-01

    There is a strong tendency among operating companies and manufacturers of nuclear power stations to further increase safety and operating availability of the plant and of its components. This applies also and particularly to reactor coolant pumps for the primary circuit of nuclear power stations of the type PWR. For 3 decades, ANDRITZ has developed and built such pumps and has attached great importance to the design of the complete pump rotor and of its essential surrounding elements, such as bearing and shaft seal. Apart from questions connected with design functioning of the pump there is one question of top priority: the operating reliability of the reactor coolant pump. The pump rotor (together with the rotor of the drive motor) is the only component within the primary system that permanently rotates at high speed during operation of the reactor plant. Many questions concerning design and configuration of such components cannot be answered purely theoretically, or they can only be answered partly. Therefore comprehensive development work and testing was necessary to increase the operating reliability of the pump rotor itself and of its surrounding elements. This contribution describes the current status of development and, as a focal point, discusses shaft sealing solutions elaborated so far. In this connection also a sealing system will be presented which aims for the first time at using a two-stage mechanical seal in reactor coolant pumps

  1. Licensed operating reactors. Status summary report, data as of September 30, 1984. Volume 8, No. 10

    International Nuclear Information System (INIS)

    1984-11-01

    This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States. The percentage computations, Items 20 through 24 in Section 2, the vendor capacity factors, and actual vs. potential energy production are computed using actual data for the period of consideration. The percentages listed in power generation are computed as an arithmetic average. The factors for the life-span of each unit (the Cumulative column) are reported by the utility. Utility power production data is checked for consistency with previously submitted statistics

  2. Acoustic emission monitoring of preservice testing at Watts Bar Unit 1 Nuclear Reactor

    International Nuclear Information System (INIS)

    Hutton, P.H.; Pappas, R.A.; Friesel, M.A.

    1985-02-01

    Acoustic emission (AE) monitoring of selected pressure boundary areas at TVA's Watts Bar, Unit 1 Nuclear Plant in the US during hot functional preservice testing is described. Background, methodology, and results are included. The work discussed here is a major milestone in a program supported by the US NRC to develop and demonstrate application of AE monitoring for continuous surveillance of reactor pressure boundaries to detect and evaluate growing flaws. The subject work demonstrated that anticipated problem areas can be overcome. Work is continuing to AE monitoring during reactor operation. 3 refs., 6 figs

  3. RA reactor operation and maintenance, Annual report 1974

    International Nuclear Information System (INIS)

    Milosevic, D. et al

    1974-12-01

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m 2 of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems [sr

  4. Design requirements, operation and maintenance of gas-cooled reactors

    International Nuclear Information System (INIS)

    1989-06-01

    At the invitation of the Government of the USA the Technical Committee Meeting on Design Requirements, Operation and Maintenance of Gas-Cooled Reactors, was held in San Diego on September 21-23, 1988, in tandem with the GCRA Conference. Both meetings attracted a large contingent of foreign participants. Approximately 100 delegates from 18 different countries participated in the Technical Committee meeting. The meeting was divided into three sessions: Gas-cooled reactor user requirement (8 papers); Gas-cooled reactor improvements to facilitate operation and maintenance (10 papers) and Safety, environmental impacts and waste disposal (5 papers). A separate abstract was prepared for each of these 23 papers. Refs, figs and tabs

  5. Operation of the BR2 Reactor

    International Nuclear Information System (INIS)

    Gubel, P.

    2006-01-01

    The BR2 is still SCK-CEN's most important nuclear facility. After an extensive refurbishment of 22 months to compensate for the ageing of the installations, to enhance the reliability of operation and to comply with modern safety standards, it was restarted in April 1997. The facility is mainly used for the irradiation and testing of fuels and materials and for commercial productions - including radioisotopes for the medical and industrial uses, and NTD-Silicon. The article describes the main achievements and activities in 2005

  6. IAEA support for operating nuclear reactors

    International Nuclear Information System (INIS)

    Akira, O.

    2010-01-01

    The IAEA programme, under the pillar of science and technology, provides support to the existing fleet of nuclear power plants (NPPs) for excellence in operation, support to new countries for infrastructure development, stimulating technology innovation for sustainable development and building national capability. Practical activities include methodology development, information sharing and providing guidance documents and state-of-the-art reports, networking of research activities, and review services using guidance documents as a basis of evaluation. This paper elaborates more on the IAEA's activities in support of the existing fleet of nuclear power plants

  7. Operation of the BR2 Reactor

    International Nuclear Information System (INIS)

    Gubel, P.

    2005-01-01

    The BR2 is still SCK-CEN's most important nuclear facility. After an extensive refurbishment of 22 months to compensate for the ageing of the installations, to enhance the reliability of operation and to comply with modern safety standards, it was restarted in April 1997. The facility is mainly used for the irradiation and testing of fuels and materials and for commercial productions - including radioisotopes for the medical and industrial uses, and NTD-Silicon. The article describes the main activities and achievements in 2004

  8. Dynamic operator actions analysis for inherently safe fast reactors and light water reactors

    International Nuclear Information System (INIS)

    Ho, V.; Apostolakis, G.

    1988-01-01

    A comparative dynamic human actions analysis of inherently safe fast reactors (ISFRs) and light water reactors (LWRs) in terms of systems response and estimated human error rates is presented. Brief overviews of the ISFR and LWR systems are given to illustrate the design differences. Key operator actions required by the ISFR reactor shutdown and decay heat removal systems are identified and are compared with those of the LWR. It is observed that, because of the passive nature of the ISFR safety-related systems, a large time window is available for operator actions during transient events. Furthermore, these actions are fewer in number, are less complex, and have lower error rates and less severe consequences than those of the LWRs. We expect the ISFR operator errors' contribution to risk is smaller (at least in the context of the existing human reliability models) than that of the LWRs. (author)

  9. Liquid metal cooled reactors: Experience in design and operation

    International Nuclear Information System (INIS)

    2007-12-01

    on key fast reactor technology aspects in an integrative sense useful to engineers, scientists, managers, university students and professors. This publication has been prepared to contribute toward the IAEA activity to preserve the knowledge gained in the liquid metal cooled fast reactor (LMFR) technology development. This technology development and experience include aspects addressing not only experimental and demonstration reactors, but also all activities from reactor construction to decommissioning. This publication provides a survey of worldwide experience gained over the past five decades in LMFR development, design, operation and decommissioning, which has been accumulated through the IAEA programmes carried out within the framework of the TWG-FR and the Agency's INIS and NKMS

  10. Approach to training the operators of WWER-440 reactors

    International Nuclear Information System (INIS)

    Pironkov, L.; Minakova, R.

    2002-01-01

    The paper has three parts. (1) Personnel Training and Qualifications (2) Description of Kozloduy NPP Training and Qualification System (TQS) built in the last 7 years and its interfaces with the Certification System and (3) Application of the TQS for the Senior Reactor Operator (SRO). (author)

  11. 1982 Annual status report: operation of the high flux reactor

    International Nuclear Information System (INIS)

    1983-01-01

    The high flux materials testing reactor has been operated in 1982 within a few percent of the pre-set schedule, attaining 73% overall availability. Its utilization reached another record figure in 20 years: 81% without, 92% with, the low enrichment test elements irradiated during the year

  12. Best Safety Practices for the Operation of Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Boeck, H.; Villa, M. [Atominstitute of the Austrian Universities, 1020 Vienna (Austria)

    2002-07-01

    A survey on administrative, organisational and technical aspects for the safe and efficient operation of a 250 kW TRIGA Mark II research reactor is given. The replacement of the I and C system is discussed, maintenance procedures are presented and the fuel management is described. (author)

  13. AMNT 2014. Key Topic: Reactor operation, safety - report. Pt. 1

    International Nuclear Information System (INIS)

    Schaffrath, Andreas

    2014-01-01

    Summary report on one session of the Annual Conference on Nuclear Technology held in Frankfurt, 6 to 8 May 2014: - Safety of Nuclear Installations - Methods, Analysis, Results: Backfittings for the Improvement of Safety and Efficiency. The other Sessions of the Key Topics 'Reactor Operation, Safety', 'Competence, Innovation, Regulation' and 'Fuel, Decommissioning and Disposal' will be covered in further issues of atw.

  14. Periodic Operation of Three-Phase Catalytic Reactors

    Czech Academy of Sciences Publication Activity Database

    Silveston, P.T.; Hanika, Jiří

    2005-01-01

    Roč. 82, č. 6 (2005), s. 1105-1142 ISSN 0008-4034 Institutional research plan: CEZ:AV0Z4072921 Keywords : three-phase reactors * trickle bed * periodic operation Subject RIV: CI - Industrial Chemistry, Chemical Engineering Impact factor: 0.574, year: 2005

  15. Best Safety Practices for the Operation of Research Reactors

    International Nuclear Information System (INIS)

    Boeck, H.; Villa, M.

    2002-01-01

    A survey on administrative, organisational and technical aspects for the safe and efficient operation of a 250 kW TRIGA Mark II research reactor is given. The replacement of the I and C system is discussed, maintenance procedures are presented and the fuel management is described. (author)

  16. Computerised programming of the Dragon reactor fuel handling operations

    International Nuclear Information System (INIS)

    Butcher, P.

    1976-11-01

    Two suites of FORTRAN IV computer programs have been written to produce check lists for the operation of the two remote control fuel handling machines of the Dragon Reactor. This document describes the advantages of these programs over the previous manual system of writing check lists, and provides a detailed guide to the programs themselves. (author)

  17. Operational readiness reviews for restart of L reactor

    International Nuclear Information System (INIS)

    Finley, R.H.

    1984-01-01

    The L Reactor at the Savannah River Plant is being restarted after being in a standby status since 1968. Operational Readiness Reviews (ORRs) were conducted by DOE-SR and contractor personnel concurrent with the restart activity. This paper summarizes the ORR activity

  18. Ensuring the operational safety of nuclear power plants with WWER reactors

    International Nuclear Information System (INIS)

    Shasharin, G.A.; Veretennikov, G.A.; Abagyan, A.A.; Lesnoj, S.A.

    1984-01-01

    At the start of 1983, 27 nuclear power producing units with reactor facilities of the WWER type were in operation in the Soviet Union and other countries. In 1982 the average load factor for nuclear power plants with WWER reactors was 73 per cent. There was not a single nuclear accident or even damage with any significant radiation consequences in the WWER reactors during the entire period of their operation. The most modern nuclear power plants with WWER-440 and WWER-1000 reactors meet all present-day international requirements. Safe operation of the plants is achieved by a variety of measures, the most important of which include: procedures for increasing the reliability of plant equipment and systems; ensuring exact compliance with plant operating instructions; ensuring reliable operation of plant safety systems; action directed towards maintaining the skills of plant personnel at a level adequate to ensure the taking of proper action during transient processes and accident situations. The paper discusses concrete steps for ensuring safe nuclear power plant operation along these lines. In particular, measures such as the following are described: the use of a system for collecting and processing information on equipment failures and defects; the development and introduction of methods of early defect diagnosis; the performance of complex testing of safety systems; the training of highly skilled personnel for nuclear power plants at educational combines and at teaching and training centres making use of simulators; arranging accident-prevention training and special instruction for personnel. (author)

  19. Reactor operating procedures for start up of continuously operated chemical plants

    NARCIS (Netherlands)

    Verwijs, J.W.; Verwijs, J.W.; Kösters, P.H.; van den Berg, Henderikus; Westerterp, K.R.; Kosters, P.G.H.

    1995-01-01

    Rules are presented for the startup of an adiabatic tubular reactor, based on a qualitative analysis of the dynamic behavior of continuously-operated vapor- and liquid-phase processes. The relationships between the process dynamics, operating criteria, and operating constraints are investigated,

  20. Annual progress report 1988, operation of the high flux reactor

    International Nuclear Information System (INIS)

    1989-01-01

    In 1988 the High Flux Reactor Petten was routinely operated without any unforeseen event. The availability was 99% of scheduled operation. Utilization of the irradiation positions amounted to 80% of the practical occupation limit. The exploitation pattern comprised nuclear energy deployment, fundamental research with neutrons, and radioisotope production. General activities in support of running irradiation programmes progressed in the normal way. Development activities addressed upgrading of irradiation devices, neutron radiography and neutron capture therapy

  1. Designing visual displays and system models for safe reactor operations

    International Nuclear Information System (INIS)

    Brown-VanHoozer, S.A.

    1995-01-01

    The material presented in this paper is based on two studies involving the design of visual displays and the user's prospective model of a system. The studies involve a methodology known as Neuro-Linguistic Programming and its use in expanding design choices from the operator's perspective image. The contents of this paper focuses on the studies and how they are applicable to the safety of operating reactors

  2. 1980 Annual status report: operation of the high flux reactor

    International Nuclear Information System (INIS)

    1981-01-01

    HFR Petten has been operated in 1980 in fulfilment of the 1980/83 JRC Programme Decision. Both reactor operation and utilization data have been met within a few percent of the goals set out in the annual working schedule, in support of a large variety of research programmes. Major improvements to experimental facilities have been introduced during the year and future modernization has been prepared

  3. Operational limitations of light water reactors relating to fuel performance

    International Nuclear Information System (INIS)

    Cheng, H.S.

    1976-07-01

    General aspects of fuel performance for typical Boiling and Pressurized Water Reactors are presented. Emphasis is placed on fuel failures in order to make clear important operational limitations. A discussion of fuel element designs is first given to provide the background information for the subsequent discussion of several fuel failure modes that have been identified. Fuel failure experiences through December 31, 1974, are summarized. The operational limitations that are required to mitigate the effects of fuel failures are discussed

  4. Introduction of long term cycle of reactor operation

    International Nuclear Information System (INIS)

    Aoyati, M.; Tanaka, T.

    2004-01-01

    Introduction of long term cycle of LWR reactor operation at NPP in Japan is considered, and problems of technical, legislative and economical character, increase of power coefficient are discussed. More long term operation period provides decreasing frequency of periodic inspections and reduction of personnel radiation doses. Reliability of fuel, energetic equipment, mechanisms and devices must be taken into account for the decision of technical problems. Consumptions for electric power generation are studied [ru

  5. Training operators of VVER-1000 units in Eastern Europe

    International Nuclear Information System (INIS)

    Normand, X.; Nabet, E.; Hauesberger, P.

    1996-01-01

    The VVER 1000 is the most recent nuclear reactor designed in the former Soviet Union. Its design and operation principles are close to Western four-loop reactors in the 1000- to 1500-MW class; therefore, the Western simulation technology is usually directly applicable to the simulation of these units. Moreover, the current number of state-of-the-art training simulators in operation is very limited. A total of 19 units are in operation, while only 2 modern simulators are available (full-scope type) in Balakovo and Zaporozhe. Access to these simulators is practically limited to the respective plants' trainees, which means that the other units have to be satisfied with hands-on training. Facing this situation and taking into account the predicted lifetime of these plants (15 to 25 yr to go, maybe more), a lot of effort has been made in recent years to provide the plants with modern simulators. The major hurdles to this action were obviously financial and technical (availability of codes, computers, software tools). Today, one full-scope project (Kalinin) is almost complete, and three have been announced (Novovoronezh, Khmelnitsky, Kozloduy). Full-scope simulators are clearly the ultimate target of a concerned power plants. However, all users do realize the advantages of the complementary approach with compact simulators: 1. They can be available quickly for starting the training process. 2. They cover a training field that is not (or partly) addressed by full-scope simulators, i.e., the demonstration of physical phenomena in normal and accidental situations

  6. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.; Miokovic, J.

    1982-12-01

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10 13 cm -2 s -1 at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the outdated spare parts

  7. Graphics and control for in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1996-01-01

    Remotely operated inspection, repair and maintenance tasks for Magnox Electric's eight twin MAGNOX-type reactor stations must conform to the Nuclear Installations Inspectorate's regulations. The performance of manipulator systems used to undertake such operations has improved significantly with the recent introduction of computer graphics. These are used for simulation and demonstration purposes as well as a real-time aid to the manipulator operator. Outage times can be reduced by the appropriate use of such computer technology to reduce manipulator operation times. (UK)

  8. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  9. Regulation concerning installation and operation of reactors for power generation

    International Nuclear Information System (INIS)

    1987-01-01

    This report shows the Ordinance of the Ministry of International Trade and Industry No.77 of December 28, 1978. The ordinance consists of provisions covering application for permission for construction of nuclear reactor (concerning continuous maximum thermal output, location, structure, reactor core, fuel material, moderator, reflector, cooling system, measurement control system, safety circuit, control system, emergency system, radioactive waste proposal facilities, construction plan, meteorology and other environmental conditions, etc.), operation plan (to be submitted every year), application for approval of joint management (name, address, facilities location, conditions for joint management, etc.), cancellation of permission (in five years from the date of permission), record keeping (density and temperature of neutron, temperature and pressure of coolant, purity of mederator, etc.), restriction on access to areas under management (measures to be taken in such areas), measures concerning exposure to radioactive rays (allowable dosage, etc.), patrol and checking in nuclear reactor facilities, self-imposed regular inspection of nuclear reactor facilities, operation of nuclear reactor, transport within plant or business establishment, storage (storing facilities, etc.), waste disposal, etc. (Nogami, K.)

  10. Steady-state operation requirements of tokamak fusion reactor concepts

    International Nuclear Information System (INIS)

    Knobloch, A.F.

    1991-06-01

    In the last two decades tokamak conceptual reactor design studies have been deriving benefit from progressing plasma physics experiments, more depth in theory and increasing detail in technology and engineering. Recent full-scale reactor extrapolations such as the US ARIES-I and the EC Reference Reactor study provide information on rather advanced concepts that are called for when economic boundary conditions are imposed. The ITER international reactor design activity concentrated on defining the next step after the JET generation of experiments. For steady-state operation as required for any future commercial tokamak fusion power plants it is essential to have non-inductive current drive. The current drive power and other internal power requirements specific to magnetic confinement fusion have to be kept as low as possible in order to attain a competitive overall power conversion efficiency. A high plasma Q is primarily dependent on a high current drive efficiency. Since such conditions have not yet been attained in practice, the present situation and the degree of further development required are characterized. Such development and an appropriately designed next-step tokamak reactor make the gradual realization of high-Q operation appear feasible. (orig.)

  11. Status of fast breeder reactor development in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Rosen, S

    1979-07-01

    This document was prepared by the Office of the Program Director for Nuclear Energy, U.S. Department of Energy (USDOE). It sets forth the status and current activities for the development of fast breeder technology in the United States. In April 1977 the United States announced a change in its nuclear energy policy. Concern about the potential for the proliferation of nuclear weapons capability emerged as a major issue in considering whether to proceed with the development, demonstration and eventual deployment of breeder reactor energy systems. Plutonium recycle and the commercialization of the fast breeder were deferred indefinitely. This led to a reorientation of the nuclear fuel cycle program which was previously directed toward the commercialization of fuel reprocessing and plutonium recycle to the investigation of a full range of alternative fuel cycle technologies. Two major system evaluation programs, the Nonproliferation Alternative Systems Assessment Program (NASAP), which is domestic, and the International Nuclear Fuel Cycle Evaluation (INFCE), which is international, are assessing the nonproliferation advantages and other characteristics of advanced reactor concepts and fuel cycles. These evaluations will allow a decision in 1981 on the future direction of the breeder program. In the interim, the technologies of two fast breeder reactor concepts are being developed: the Liquid Metal Fast Breeder Reactor (LMFBR) and the Gas Cooled Fast Reactor (CFR). The principal goals of the fast breeder program are: LMFBR - through a strong R and D program, consistent with US nonproliferation objectives and anticipated national electric energy requirements, maintain the capability to commit to a breeder option; investigate alternative fuels and fuel cycles that might offer nonproliferation advantages; GCFR - provide a viable alternative to the LMFBR that will be consistent with the developing U.S. nonproliferation policy; provide GCFR technology and other needed

  12. Operational benchmark for VVER-1000, unit 6, Kozloduy NPP

    International Nuclear Information System (INIS)

    Apostolov, T.; Petrov, B.

    1999-01-01

    Benchmark calculations have been carried out using the 3D nodal code TRAPEZ. Global neutron-physics characteristics of the VVER-1000 core, Kozloduy NPP Unit 6, have been determined taking into account the real loading patterns and operational history of the first three cycles. The code TRLOAD has been used to perform the fuel reloading between any two cycles. The reactor and components descriptions as well as material compositions are given. The results presented include the critical boric acid concentration, the radial power distribution, the axial power distribution for the maximum overload assembly, and the burnup distribution at three different moments during each cycle. Calculated values have been compared with measured data. It is shown that the results obtained by the TRAPEZ code are in good agreement with the experimental data. The information presented could serve as a test case for validation of code packages designed for analyzing the steady-state operation of VVERs. (author)

  13. Reactor physics computer code development for neutronic design, fuel-management, reactor operation and safety analysis of PHWRs

    International Nuclear Information System (INIS)

    Rastogi, B.P.

    1989-01-01

    This report discusses various reactor physics codes developed for neutronic design, fuel-management, reactor operation and safety analysis of PHWRs. These code packages have been utilized for nuclear design of 500 MWe and new 235 MWe PHWRs. (author)

  14. Modification of the Penn State Reactor to allow transverse and rotational core motion to increase operational versatility

    International Nuclear Information System (INIS)

    Hughes, Daniel E.

    1994-01-01

    At Penn State the Nuclear Engineering students have the opportunity to perform experiments in reactor physics, work with reactor and radiation instrumentation, and operate a nuclear reactor. These activities are done at the Penn State Breazeale Reactor (PSBR), a General Atomics Mark III TRIGA reactor. Unfortunately this activity alone can not fully support the facility. The PSBR is mandated by Penn State to provide a portion of its operating budget by selling services to users outside as well as inside Penn State. In order to increase the marketability of PSBR an upgrade program was started to increase the quality and versatility of operation. The PSBR is the longest operating university reactor in the United States. The first phase of the upgrade program began in 1992. The quality of operation was increased by replacing a 1965 vintage console with a more reliable digital control and monitoring system. The present phase of the upgrade program is to increase the versatility of operation by modifying the reactor to allow transverse and rotational core motion. Adding two more degrees of motion to the reactor core increases the capability of the facility to meet the needs of present and future users. This upgrade is being financed by a grant from the Department of Energy and matching funds from Penn State. (author)

  15. Analysis of Kinetic Parameter Effect on Reactor Operation Stability of the RSG-GAS Reactor

    International Nuclear Information System (INIS)

    Rokhmadi

    2007-01-01

    Kinetic parameter has influence to behaviour on RSG-GAS reactor operation. In this paper done is the calculation of reactivity curve, period-reactivity relation and low power transfer function in silicide fuel. This parameters is necessary and useful for reactivity characteristic analysis and reactor stability. To know the reactivity response, it was done reactivity insertion at power 1 watt using POKDYN code because at this level of power no feedback reactivity so important for reactor operation safety. The result of calculation showed that there is no change of significant a period-reactivity relation and transfer function at low power for 2.96 gU/cc, 3.55 gU/cc and 4.8 gU/cc density of silicide fuels. The result of the transfer function at low power showed that the reactor is critical stability with no feedback. The result of calculation also showed that reactivity response no change among three kinds of fuel densities. It can be concluded that from kinetic parameter point of view period-reactivity relation, transfer function at low power, and reactivity response are no change reactor operation from reactivity effect when fuel exchanged. (author)

  16. Licensed operating reactors. Status summary report data as of March 31, 1986. Volume 10, No. 4

    International Nuclear Information System (INIS)

    1986-05-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States. The percentage computations, Items 20 through 24 in Section 2, the vendor capacity factors on page 1-7, and actual vs potential energy production on page 1-2 are computed using actual data for the period of consideration. The percentages listed in power generation on page 1-2 are computed as a arithmetic average. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely recomputed by NRC. Utility power production data is checked for consistency with previously submitted statistics. It is hoped this status report proves informative and helpful to all agencies and individuals interested in analyzing trends in the nuclear industry which might have safety implications, or in maintaining an awareness of the US energy situation as a whole

  17. Licensed operating reactors. Status summary report, data as of October 31, 1985. Volume 9, No. 11

    International Nuclear Information System (INIS)

    1985-12-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Resource Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States. The percentage computations, Items 20 through 24 in Section 2, the vendor capacity factors on page 1-7, and actual vs potential energy production on page 1-2 are computed using actual data for the period of consideration. The percentages listed in power generation on page 1-2 are computed as an arithmetic average. The factors for the life-span of each unit (the ''Cumulative'' column) are reported by the utility and are not entirely re-computed by NRC. Utility power production data is checked for consistency with previously submitted statistics

  18. Control of operational transients in power reactors - Methodology

    International Nuclear Information System (INIS)

    Vukovic, D.

    1983-01-01

    By introducing the nuclear power stations in the electric power system, questions of their possibilities to satisfy system's demand arise. Control of operational transients (temperature and Xe 135 ) in power reactors by determining the optimal control rod strategy is given. Ti optimize the Xe 135 transients, the Pantryagin theorem of optimal processes is applied. For solving three dimensional, two-group diffusion equations the heterogeneous Feinberg-Galanin method with axial flux harmonics is adopted. An application of this formalism to three-dimensional, finite cylindrical pressurised water reactor radially reflected is presented. (author)

  19. Experience in the recruitment, organization and training of operations and maintenance personnel for the Malaysian research reactor

    International Nuclear Information System (INIS)

    Jamal Khair Ibrahim.

    1983-01-01

    The TRIGA Reactor located at the Tun Ismail Atomic Research Centre (PUSPATI) Complex is owned and operated by the Nuclear Energy Unit of the Prime Minster's Department. The operations and maintenance personnel are part and parcel of the national civil service organization. As such, the requirement and remuneration of these personnel are handled by a central federal government personnel management agency in common with personnel from other federal government agencies. In addition, the reactor is the first and only one in Malaysia, a developing country, which is the process of committing herself towards a nuclear power programme. These factors coupled with the absence of an independent reactor operator licensing agency posed unique problems in the recruitment, organization, training and licensing of operations personnel for the facility. The paper discusses these factors and their bearing on the recruitment, training, licensing and career development prospects of the PUSPATI TRIGA Reactor operators. (author)

  20. The regulation and licensing of research reactors and associated facilities in the United Kingdom

    International Nuclear Information System (INIS)

    Weightman, M.W.; Willby, C.R.

    1990-01-01

    In the United Kingdom, the Nuclear Installations Inspectorate (NII) licenses nuclear facilities, including research reactors, on behalf of the Health and Safety Executive (HSE). The legislation, the regulatory organizations and the methods of operation that have been developed over the last 30 years result in a largely non-prescriptive form of control that is well suited to research reactors. The most important part of the regulatory system is the license and the attachment of conditions which it permits. These conditions require the licensee to prepare arrangements to control the safety of the facility. In doing so the licensee is encouraged to develop a 'safety culture' within its organization. This is particularly important for research reactors which may have limited staff resources and where the ability, and at times the need, to have access to the core is much greater than for nuclear power plants. Present day issues such as the ageing of nuclear facilities, public access to the rationale behind regulatory decisions, and the emergence of more stringent safety requirements, which include a need for quantified safety criteria, have been addressed by the NII. This paper explores the relevance of such issues to the regulation of research reactors. In particular, it discusses some of the factors associated with research reactors that should be considered in developing criteria for the tolerability of risk from these nuclear facilities. From a consideration of these factors, it is the authors' view that the range of tolerable risk to the public from the operation of new research reactors may be expected to be more stringent than similar criteria for new nuclear power plants, whereas the criteria for tolerable risk for research reactor workers are expected to be about the same as those for power reactor workers

  1. Gas cooled reactor decommissioning. Packaging of waste for disposal in the United Kingdom deep repository

    International Nuclear Information System (INIS)

    Barlow, S.V.; Wisbey, S.J.; Wood, P.

    1998-01-01

    United Kingdom Nirex Limited has been established to develop and operate a deep underground repository for the disposal of the UK's intermediate and certain low level radioactive waste. The UK has a significant Gas Cooled Reactor (GCR) programme, including both Magnox and AGR (Advanced Gas-cooled Reactor) capacity, amounting to 26 Magnox reactors, 15 AGR reactors as well as research and prototype reactor units such as the Windscale AGR and the Windscale Piles. Some of these units are already undergoing decommissioning and Nirex has estimated that some 15,000 m 3 (conditioned volume) will come forward for disposal from GCR decommissioning before 2060. This volume does not include final stage (Stage 3) decommissioning arisings from commercial reactors since the generating utilities in the UK are proposing to adopt a deferred safe store strategy for these units. Intermediate level wastes arising from GCR decommissioning needs to be packaged in a form suitable for on-site interim storage and eventual deep disposal in the planned repository. In the absence of Conditions for Acceptance for a repository in the UK, the dimensions, key features and minimum performance requirements for waste packages are defined in Waste Package Specifications. These form the basis for all assessments of the suitability of wastes for disposal, including GCR wastes. This paper will describe the nature and characteristics of GCR decommissioning wastes which are intended for disposal in a UK repository. The Nirex Waste Package Specifications and the key technical issues, which have been identified when considering GCR decommissioning waste against the performance requirements within the specifications, are discussed. (author)

  2. Operation and maintenance of the RB reactor, Annual report for 1980

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.; Markovic, H.; Zivkovic, B.; Gogdanovic, M.; Petronijevic, M.

    1980-12-01

    This report includes data concerned with reactor operation and utilization, status of reactor components and equipment, refurbishment of the equipment, dosimetry and radiation protection, reactor staff, financing. It includes 9 Annexes as follows: Utilization of the RB reactor from 1976 - 1980; program of reactor utilization from 1981-1985; contents of the RB reactor safety report; maintenance of the reactor components and equipment in 1980; verification of reactor reliability after the earthquake (May 18 1980); refurbishment of equipment in 1980, and purchasing new equipment from 1981-1985; review of radiation doses in the reactor building and exposure doses for the reactor staff; personnel data and financial data

  3. U.S. Department of Energy operational experience with shipments of foreign research reactor spent nuclear fuel

    International Nuclear Information System (INIS)

    Messick, Charles E.; Massey, Charles D.; Mustin, Tracy P.

    1998-01-01

    On May 13, 1996, the U.S. Department of Energy issued a Record of Decision on a Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel. The goal of the long-term policy is to recover enriched uranium exported from the United States, while giving foreign research reactor operators sufficient time to develop their own long-term solutions for storage and disposal of spent fuel. The spent fuel accepted by the U.S. DOE under the policy must be out of the research reactors by May 12, 2006 and returned to the United States by May 12, 2009. (author)

  4. International benchmark for coupled codes and uncertainty analysis in modelling: switching-Off of one of the four operating main circulation pumps at nominal reactor power at NPP Kalinin unit 3

    International Nuclear Information System (INIS)

    Tereshonok, V. A.; Nikonov, S. P.; Lizorkin, M. P.; Velkov, K; Pautz, A.; Ivanov, V.

    2008-01-01

    The paper briefly describes the Specification of an international NEA/OECD benchmark based on measured plant data. During the commissioning tests for nominal power at NPP Kalinin Unit 3 a lot of measurements of neutron and thermo-hydraulic parameters have been carried out in the reactor pressure vessel, primary and the secondary circuits. One of the measured data sets for the transient 'Switching-off of one Main Circulation Pump (MCP) at nominal power' has been chosen to be applied for validation of coupled thermal-hydraulic and neutron-kinetic system codes and additionally for performing of uncertainty analyses as a part of the NEA/OECD Uncertainty Analysis in Modeling Benchmark. The benchmark is opened for all countries and institutions. The experimental data and the final specification with the cross section libraries will be provided to the participants from NEA/OECD only after official declaration of real participation in the benchmark and delivery of the simulated results of the transient for comparison. (Author)

  5. Alteration in reactor installations (Unit 1 and 2 reactor facilities) in the Hamaoka Nuclear Power Station of The Chubu Electric Power Co., Inc. (report)

    International Nuclear Information System (INIS)

    1982-01-01

    A report by the Nuclear Safety Commission to the Ministry of International Trade and Industry concerning the alteration in Unit 1 and 2 reactor facilities in the Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., was presented. The technical capabilities for the alteration of reactor facilities in Chubu Electric Power Co., Inc., were confirmed to be adequate. The safety of the reactor facilities after the alteration was confirmed to be adequate. The items of examination made for the confirmation of the safety are as follows: reactor core design (nuclear design, mechanical design, mixed reactor core), the analysis of abnormal transients in operation, the analysis of various accidents, the analysis of credible accidents for site evaluation. (Mori, K.)

  6. A review of the United Kingdom fast reactor programme

    International Nuclear Information System (INIS)

    Bramman, J.I.; Hickey, H.B.; Whitlow, W.H.; Frew, J.D.; Gregory, C.V.

    1990-01-01

    Total energy consumption in the UK in 1989 was 340 million tonnes of coal or coal equivalent, made up as follows: coal 31%, petroleum 35%, natural gas 24%, nuclear electricity 8%, hydroelectricity 1% and imported electricity 1%. About half of the nuclear electricity generated came from 14 Advanced Gas-Cooled Reactors (AGRs) and about half from the 24 older gas-cooled Magnox reactors, one Steam-Generating Heavy-Water Reactor (SGHWR) and one fast reactor (the Prototype Fast Reactor, PFR, at Dounreay). The privatization of the Electricity Supply Industry (ESI) in the UK is proceeding. On 9 November 1989, however, it was announced by the Secretary of State for Energy that the privatization plan would be changed and that the CEGB's nuclear stations were to remain in state ownership, through the formation of an additional company, Nuclear Electric. At the same time, the Secretary of State for Scotland announced the formation of a similar state-owned company, Scottish Nuclear. Nuclear Electric was asked, in the interim, to examine priorities in the whole nuclear field with particular reference to the improvement of the economics and performance of existing reactors, to the development of the Sizewell and alternative reactors and to the development of longer-term options such as the fast reactor and fusion. Nuclear Electric has been asked to formulate its new policy by June 1990. The PFR programme will continue to be funded by the UK government until March 1994. AEA Technology is endeavouring to find alternative funding to maintain the operation of the PFR until at least the year 2000. The House of Commons Select Committee on Energy stated in its report that the fast reactor ''is a matter for the British Government to foster as a long-term option for the generation of electricity in this country'', and recommended that in the interim the Government reassesses its position on this new technology in the light of increasing concern about CO 2 emissions and the long

  7. Radioactive effluents from CANDU 6 reactors during normal operation

    International Nuclear Information System (INIS)

    Boss, C.R.; Allsop, P.J.

    1995-12-01

    During routine operation of a CANDU 6 reactor, various gaseous, liquid, and solid radioactive wastes are generated. The layout of the CANDU 6 reactor and the design of its systems ensure that these are minimized, but small quantities of gaseous and liquid wastes are continually discharged at very low concentrations. This report discusses the make-up of these chronically generated gaseous and liquid effluents. From a safety perspective, the doses to individual members of the public resulting from radioactive wastes chronically discharged from CANDU 6 reactors have been negligible. Similarly, doses to the regional and global populations have been negligible, generally less than 0.001% of background. While far below regulatory limits, releases of tritium, noble gases and gross β - -γ have been the most radiologically significant emissions, while radioiodine and particulates have had the greatest potential to deliver public dose. (author). 8 refs., 16 tabs., 3 figs

  8. Diamond Ordinance Radiation Facility (DORF) reactor operating experiences

    International Nuclear Information System (INIS)

    Gieseler, Walter

    1970-01-01

    The Diamond Ordnance Radiation Facility Mark F Reactor is described and some of the problems encountered with its operation are discussed. In a period from reactor startup in September 1961 to June 1964, when the aluminum-clad core was changed to a stainless-steel clad core, a total of 30 fuel elements were removed from reactor service because of excessive growth. One leaking fuel element was detected during the lifetime of the aluminum- clad core. In June 1964, the core was changed to the stainless-steel-clad high hydride fuel elements. Since the installation of the stainless-steel-clad fuel element core, there has been a gradual decline of excess reactivity. Various theories were discussed as the cause but the investigations have resulted in no definitive conclusion that could account for the total reactivity loss

  9. Safe design and operation of fluidized-bed reactors: Choice between reactor models

    NARCIS (Netherlands)

    Westerink, E.J.; Westerterp, K.R.

    1990-01-01

    For three different catalytic fluidized bed reactor models, two models presented by Werther and a model presented by van Deemter, the region of safe and unique operation for a chosen reaction system was investigated. Three reaction systems were used: the oxidation of benzene to maleic anhydride, the

  10. Fuzzy operation and real time surveillance of a nuclear reactor

    International Nuclear Information System (INIS)

    Si-Fodil, M.; Guely, F.; Siarry, P.; Tyran, J.L.

    1997-01-01

    The operating power of nuclear power plants needs to be modulated according to the thin evolutions of electric power demand. Two parameters are concerned by load following operations: the power axial disequilibrium and the position of control rods. This paper deals with the automation of the control of power axial disequilibrium using boration-dilution. An automatic system based on fuzzy logic is proposed which can be substituted to the expert operator who is in charge of this fastidious manual task. The management of water and boron flow rates are studied in details. A Graphic interface was designed for the real-time surveillance of the reactor. (J.S.)

  11. Meeting the reactor operator's information needs using functional analysis

    International Nuclear Information System (INIS)

    Nelson, W.R.; Clark, M.T.

    1980-01-01

    Since the accident at Three Mile Island, many ideas have been proposed for assisting the reactor operator during emergency situations. However, some of the suggested remedies do not alleviate an important shortcoming of the TMI control room: the operators were not presented with the information they needed in a manner which would allow prompt diagnosis of the problem. To address this problem, functional analysis is being applied at the LOFT facility to ensure that the operator's information needs are being met in his procedures and graphic displays. This paper summarizes the current applications of functional analysis at LOFT

  12. Issues and approaches in control for autonomous reactor operation

    International Nuclear Information System (INIS)

    Vilim, R. B.; Khalil, H. S.; Wei, T. Y. C.

    2000-01-01

    A capability for autonomous and passively safe operation is one of the goals of the NERI funded development of Generation IV nuclear plants. An approach is described for evaluating the effect of increasing autonomy on safety margins and load behavior and for examining issues that arise with increasing autonomy and their potential impact on performance. The method provides a formal approach to the process of exploiting the innate self-regulating property of a reactor to make it less dependent on operator action and less vulnerable to automatic control system fault and/or operator error. Some preliminary results are given

  13. Plasma engineering analyses of tokamak reactor operating space

    International Nuclear Information System (INIS)

    Houlberg, W.; Attenberger, S.E.

    1981-01-01

    A comprehensive method is presented for analyzing the potential physics operating regime of fusion reactor plasmas with detailed transport codes. Application is made to the tokamak Fusion Engineering Device (FED). The relationships between driven and ignited operation and supplementary heating requirements are examined. The reference physics models give a finite range of density and temperature over which physics objectives can be reached. Uncertainties in the confinement scaling and differences in supplementary heating methods can expand or contract this operating regime even to the point of allowing ignition with the more optimistic models

  14. The 4th surveillance testing for Kori unit 3 reactor vessel materials

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Kee Ok; Kim, Byoung Chul; Lee, Sam Lai; Choi, Kwun Jae; Gong, Un Sik; Chang, Jong Hwa; Joo, Yong Sun; Ahn, Sang Bok; Hong, Joon Hwa [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2000-10-01

    Surveillance testing for reactor vessel materials is performed in order to evaluate the irradiation embrittlement due to neutrons during operation and set the condition of safe operation of nuclear reactor. The 4th surveillance testing was performed completely by Korea Atomic Energy Research Institute at Taejeon after the capsule was transported from Kori site including its removal from reactor. Fast neutron fluences for capsules were calculated and various testing including mechanical and chemistry analysis were performed in order to evaluate the integrity of Kori unit 3 reactor vessel during the operation until life time. The evaluation results are as follows; Fast neutron fluences for capsules U, V, X and W are 4.983E+18, 1.641E+19, 3.158E+19, and 4.469E+19n/cm{sup 2}, respectively. The bias factor, the ratio of calculation/measurement, was 0.840 for the 1st through 4th testing and the calculational uncertainty, 12% satisfied the requirement of USNRC Reg.Guide DG-1053, 20%. The best estimated neutron fluence for reactor vessel inside surface was 1.362E+19n/cm{sup 2} based on the end of 12th fuel cycle and it was predicted that the fluences of vessel inside surface at 32, 40, 48 and 56EFPY would reach 3.481E+19, 4.209E+19, 5.144E+19 and 5.974E+19n/cm{sup 2} based on the current calculation. The result through this analysis for Kori unit 3 showed that there would be no problem for the pressurized thermal shock(PTS) during the operation until design life. 48 refs., 35 figs., 41 tabs. (Author)

  15. The 5th surveillance testing for Kori unit 2 reactor vessel materials

    Energy Technology Data Exchange (ETDEWEB)

    Chang, Kee Ok; Kim, Byoung Chul; Lee, Sam Lai; Choi, Kwon Jae; Gong, Un Sik; Chang, Jong Hwa; Joo, Yong Sun; Ahn, Sang Bok; Hong, Joon Hwa [Korea Atomic Energy Research Institute, Taejeon (Korea)

    2001-03-01

    Surveillance testing for reactor vessel materials is performed in order to evaluate the irradiation embrittlement due to neutrons during operation and set the condition of safe operation of nuclear reactor. The 5th surveillance testing was performed completely by Korea Atomic Energy Research Institute at Taejeon after the capsule was transported from Kori site including its removal from reactor. Fast neutron fluences for capsules were calculated and various testing including mechanical and chemistry analysis were performed in order to evaluate the integrity of Kori unit 2 reactor vessel during the operation until life time. The evaluation results are as follows; Fast neutron fluences for capsules V, R, P, T and N are 2.837E+18, 1.105E+19, 2.110E+19, 3.705E+19 and 4.831E+19n/cm{sup 2}, respectively. The bias factor, the ratio of measurement/calculation, was 0.918 for the 1st through 5th testing and the calculational uncertainty, 11.6% satisfied the requirement of USNRC Reg.Guide DG-1053, 20%. The best estimated neutron fluence for reactor vessel inside surface was 1.898E+19n/cm{sup 2} based on the end of 15th fuel cycle and it was predicted that the fluences of vessel inside surface at 32, 40, 48 and 56EFPY would reach 4.203E+19, 5.232E+19, 6.262E+19 and 7.291E+19n/cm{sup 2} based on the current calculation. The result through this analysis for Kori unit 2 showed that there would be no problem for the pressurized thermal shock(PTS) during the operation until design life. 49 refs., 35 figs., 48 tabs. (Author)

  16. Current safety issues related to research reactor operation

    International Nuclear Information System (INIS)

    Alcala-Ruiz, F.

    2000-01-01

    The Agency has included activities on research reactor safety in its Programme and Budget (P and B) since its inception in 1957. Since then, these activities have traditionally been oriented to fulfil the Agency's functions and obligations. At the end of the decade of the eighties, the Agency's Research Reactor Safety Programme (RRSP) consisted of a limited number of tasks related to the preparation of safety related publications and the conduct of safety missions to research reactor facilities. It was at the beginning of the nineties when the RRSP was upgraded and expanded as a subprogramme of the Agency's P and B. This subprogramme continued including activities related to the above subjects and started addressing an increasing number of issues related to the current situation of research reactors (in operation and shut down) around the world such as reactor ageing, modifications and decommissioning. The present paper discusses some of the above issues as recognised by various external review or advisory groups (e.g., Peer Review Groups under the Agency's Performance Programme Appraisal System (PPAS) or the standing International Nuclear Safety Advisory Group (INSAG)) and the impact of their recommendations on the preparation and implementation of the part of the Agency's P and B relating to the above subject. (author)

  17. Operation control device for a nuclear reactor fuel exchanger

    International Nuclear Information System (INIS)

    Aida, Takashi.

    1984-01-01

    Purpose: To provide a operation control device for a nuclear reactor fuel exchanger with reduced size and weight capable of optionally meeting the complicated and versatile mode of the operation scope. Constitution: The operation range of a fuel exchanger is finely divided so as to attain the state capable of discriminating between operation-allowable range and operation-inhibitive range, which are stored in a memory circuit. Upon operating the fuel exchanger, the position is detected and a divided range data corresponding to the present position is taken out from the memory circuit so as to determine whether the fuel exchanger is to be run or stopped. Use of reduced size and compact IC circuits (calculation circuit, memory circuit, data latch circuit) and input/output interface circuits or the likes contributes to the size reduction of the exchanger control system to enlarge the floor maintenance space. (Moriyama, K.)

  18. HDS unit revamp and operating experience

    Energy Technology Data Exchange (ETDEWEB)

    Reinhardt, J. [Veba Oel Verarbeitungs-GmbH, Gelsenkirchen (Germany); Balfanz, U. [Aral Forschung, Gelsenkirchen (Germany); Dimmig, T. [TU Bergakademie Freiberg, Freiberg (Germany)

    2002-12-01

    Ruhr Oel GmbH, a joint venture between BP and PDVSA, operates a HDS unit at its Gelsenkirchen-Scholven site. The unit produces a major blend component for diesel fuel. Driven by ambitious German environmental policy and by an agreement between the German car and oil industries on the one hand and the government on the other, more stringent low sulphur fuel specifications will be enforced in Germany much earlier than in the rest of the European Union. In view of this situation a project was developed to fulfill the new product specifications with minimum investment. In a joint effort involving the refinery, the company research facilities and the catalyst supplier (AKZO NOBEL), pilot plant tests were performed to develop the best catalyst system and the new process conditions. Based on these results, an existing HDS unit was accordingly revamped. After the revamp, the unit produced diesel fuel with 50 ppm sulphur content and furthermore test runs at 10 ppm were carried out successfully. These results are displayed in this article. (orig.)

  19. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1983

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Raickovic, N.; Radivojevic, J.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1983-12-01

    After regular shutdown in November 1982, inspection of the fuel elements from the RA reactor core which was done from December 1982 - February 1983 has shown that there are deposits of aluminium oxides on the surface of the fuel cladding. After restart The RA reactor was operated at power levels from 1.8 - 2 MW, with 80% enriched uranium dioxide fuel elements. It was found that there was no corrosion of the fuel element cladding and that it was not possible to find the cause of surface deposition on the cladding surfaces without further operation. It was decided to purify the heavy water permanently during operation and to increase the heavy water flow by operating two pumps. This procedure was adopted in order to decrease the possibility of corrosion. The Safety committee of the Institute has approved this procedure for operating the RA reactor in 1983. The core was made of 80% enriched fuel, critical experiments were done until June 1983, and after that the operation was continued at power levels up to 2 MW [sr

  20. The United States Advanced Reactor Technologies Research and Development Program

    International Nuclear Information System (INIS)

    O’Connor, Thomas J.

    2014-01-01

    The following aspects are addressed: • Nuclear energy mission; • Reactor research development and deployment (RD&D) programs: - Light Water Reactor Sustainability Program; - Small Modular Reactor Licensing Technical Support; - Advanced Reactor Technologies (ART)

  1. Validation of BN Reactor Plant Long-Term Operation

    International Nuclear Information System (INIS)

    Vilensky, O.; Vasilyev, B.; Kaidalov, V.

    2013-01-01

    The BN RP operation life time is mainly determined by resource of non-replaceable equipment. The new standard (RD) “Procedure of strength analysis for main components of sodium cooled fast neutron reactor plants” was developed to validate structure strength in view of radiation effects and degradation of material properties within the time period up to 300000 hours and under irradiation, as well as development of postulated crack-like defects. Using this RD, the extension of operation life of BN-600 reactor non-replaceable components from 30 to 45 years, as well as strength and durability of the most loaded non-replaceable components of BN-800 RP under construction were validated for the specified 45-year operation life. Wider application of steel 16Cr-11Ni-3Mo refers to new decisions in BN-1200 RP design that allow increasing of operation life of the most loaded non-replaceable components up to 60 years. High-chromium steel 12Cr-Ni-Mo-V-Nb is a new material, which was proposed for SG design to increase the operation life up to 30 years. In addition, the austenitic steels 18Cr-9Ni and 16Cr-11Ni-3Mo are now under upgrading for future application of them in commercial BN-1200 RP. To provide additional long-term reliable and safe operation of BN-1200 RP equipment and pipelines, it is planned to develop and implement the lifetime operational monitoring system

  2. Current status of operation and utilization of the Dalat Research Reactor

    International Nuclear Information System (INIS)

    Dien, Nguyen Nhi

    2006-01-01

    research reactors used Russia fuels was submitted to Russian Government though IAEA. After that, the Russian Research Reactor Fuel Return (RRRFR) Program was established and trilateral discussions among the United State, the Russian Federation and the IAEA started. In this aspect, the Dalat reactor core has been considered to insert fresh LEU FAs instead of fresh HEU FAs. It means the mixed core of HEU and LEU FAs may be used in the coming years. For these purposes, neutronics and thermal hydraulics calculations and safety analyses should be done. The current status of the reactor operation and utilization as well as some results on in-core fuel management of the DNRR are presented in this paper. Some activities to participating in the project on Research Reactor Technology for Effective Utilization are proposed for discussions. (author)

  3. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  4. Moving into the 21st century - The United States' Research Reactor Spent Nuclear Fuel Acceptance Program

    International Nuclear Information System (INIS)

    Huizenga, David G.; Mustin, Tracy P.; Saris, Elizabeth C.; Reilly, Jill E.

    1999-01-01

    Since 1996, when the United States Department of Energy and the Department of State jointly adopted the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel, twelve shipments totaling 2,985 MTR and TRIGA spent nuclear fuel assemblies from research reactors around the world have been accepted into the United States. These shipments have contained approximately 1.7 metric tons of HEU and 0.6 metric tons of LEU. Foreign research reactor operators played a significant role in this success. A new milestone in the acceptance program occurred during the summer of 1999 with the arrival of TRIGA spent nuclear fuel from Europe through the Charleston Naval Weapons Station via the Savannah River Site to the Idaho National Engineering and Environmental Laboratory. This shipment consisted of five casks of TRIGA spent nuclear fuel from research reactors in Germany, Italy, Slovenia, and Romania. These casks were transported by truck approximately 2,400 miles across the United States (one cask packaged in an ISO container per truck). Drawing upon lessons learned in previous shipments, significant technical, legal, and political challenges were addressed to complete this cross-country shipment. Other program activities since the last RERTR meeting have included: formulation of a methodology to determine the quantity of spent nuclear fuel in a damaged condition that may be transported in a particular cask (containment analysis for transportation casks); publication of clarification of the fee policy; and continued planning for the outyears of the acceptance policy including review of reactors and eligible material quantities. The United States Foreign Research Reactor Spent Nuclear Fuel Acceptance Program continues to demonstrate success due to the continuing commitment between the United States and the research reactor community to make this program work. We strongly encourage all eligible research reactors to decide as soon as possible to

  5. Effect of RCIC Operating Conditions on the Accident Scenario in Fukushima Unit 2

    International Nuclear Information System (INIS)

    Kim, Sung Il; Park, Jong Hwa; Ha, Kwang Soon

    2015-01-01

    This study was conducted by using MELCOR 1.8.6. Fukushima unit 2 accident was analyzed using MELCOR in this study, and best estimate scenario with considering RCIC operating conditions was presented. Researches on the boiling water reactor (BWR) plant with reactor core isolation cooling (RCIC) system have been conducted. Research on the RCIC operation in Fukushima unit 2 was also conducted by Sandia National Laboratory. MELCOR analysis of the Fukushima unit 2 accident was conducted in the report and energy balance in wetwell was described by considering RCIC operation. However, the effect of RCIC operation condition on the accident scenario has not been studied. The operating conditions of RCIC system affect the pressures in wetwell and drywell, and the high pressure can make leakage path of fission product from PCV to reactor building. Thus it can be directly related with the amount of fission product which released to environment. In this study, severe accident on Fukushima unit 2 was analyzed considering the operating condition of RCIC system, and best estimated scenario was presented. In addition, the effect of RCIC turbine efficiency on the accident progression was examined. Energy balance in suppression chamber was also considered with discussion on the effect of torus room flooding level. It was found that the operating condition of RCIC turbine not only affects the variation of drywell pressure but also the amount of released fission products to environment. It was also confirmed that the RCIC turbine efficiency in the accident would be less than normal operating condition

  6. Economic evaluation of nuclear reactor operation utilizing power effect

    International Nuclear Information System (INIS)

    Budinsky, M.; Mydliar, J.

    1988-01-01

    The operation of a reactor at the so-called power effect may substantially increase the burnup of fuel to be removed. The aim of the evaluation of such reactor operation is the optimal determination of the time over which the yield of the higher use of fuel exceeds economic losses resulting from the increased share of constant expenditure of the price of generated kWh of electric power which ensues from such operation. A mathematical model is presented for such evaluation of reactor operation with regard to benefits for the national economy which is the basis of the ESTER 2 computer program. The calculations show that the prices of generated and delivered kWh are minimally 2% less than the prices of generated power without the power effect use. The minimum ranges in the interval of 30 to 50 days. The dependence of the price of generated and delivered kWh from the point of view of the operator of the power plant as well as the component of fuel price of generated kWh will not reach the minimum even after 50 days of operation. From the operating and physical points of view the duration of power effect is not expected to exceed 20 to 30 days which means that from the point of view of the national economy the price of generated and delivered kWh will be 1.6 to 2% less and the fuel component of the price of the generated kWh will be 3 to 4.5% lower. (Z.M.). 5 figs., 3 refs

  7. Overcoming the effects of stress on reactor operator performance

    International Nuclear Information System (INIS)

    He Xuhong; Wei Li; Zhao Bingquan

    2003-01-01

    Reactor operators may be exposed to significant levels of stress during plant emergencies and their performance may be affected by the stress. This paper first identified the potential sources of stress in the nuclear power plant, then discussed the ways in which stress is likely to affect the reactor operators, and finally identified several training approaches for reducing or eliminating stress effects. The challenges for effective stress reducing training may seem daunting, yet the challenges are real and must be addressed. This paper reviewed researches in training design, knowledge and skill acquisition, and training transfer point to a number of strategies that can be used to address these challenges and lead to more effective training and development. (author)

  8. Five years of operating the TRIGA Mainz reactor

    International Nuclear Information System (INIS)

    Benedict, Georg

    1970-01-01

    Considerable obstacles had to be surmounted before TRIGA MAINZ, first TRIGA reactor built in Germany, reached initial criticality in 1965. Subsequent five years' operation did not raise any major problems. The facility has proven quite reliable and particularly well suited for the purposes of the nuclear chemistry research program pursued at Mainz University. Extensive use is made of the pulse mode of operation. As a result, fuel elements are obviously somewhat overstressed, even though most pulses performed are of the 1.50 dollar size. Maximum licensed steady state power of 100 kW till now has met the requirements of most experiments. However, efforts are in progress to improve irradiation conditions by increasing the reactor power to 300 kW. (author)

  9. Neurocontrol of Pressurized Water Reactors in Load-Follow Operations

    International Nuclear Information System (INIS)

    Lin Chaung; Shen Chihming

    2000-01-01

    The neurocontrol technique was applied to control a pressurized water reactor (PWR) in load-follow operations. Generalized learning or direct inverse control architecture was adopted in which the neural network was trained off-line to learn the inverse model of the PWR. Two neural network controllers were designed: One provided control rod position, which controlled the axial power distribution, and the other provided the change in boron concentration, which adjusted core total power. An additional feedback controller was designed so that power tracking capability was improved. The time duration between control actions was 15 min; thus, the xenon effect is limited and can be neglected. Therefore, the xenon concentration was not considered as a controller input variable, which simplified controller design. Center target strategy and minimum boron strategy were used to operate the reactor, and the simulation results demonstrated the effectiveness and performance of the proposed controller

  10. Overcoming the effects of stress on reactor operator performance

    Energy Technology Data Exchange (ETDEWEB)

    He Xuhong; Wei Li; Zhao Bingquan [Tsinghua Univ., Nuclear Power Plant Simulation Training Center, Beijing (China)

    2003-03-01

    Reactor operators may be exposed to significant levels of stress during plant emergencies and their performance may be affected by the stress. This paper first identified the potential sources of stress in the nuclear power plant, then discussed the ways in which stress is likely to affect the reactor operators, and finally identified several training approaches for reducing or eliminating stress effects. The challenges for effective stress reducing training may seem daunting, yet the challenges are real and must be addressed. This paper reviewed researches in training design, knowledge and skill acquisition, and training transfer point to a number of strategies that can be used to address these challenges and lead to more effective training and development. (author)

  11. AMNT 2014. Key Topic: Reactor operation, safety - report. Pt. 1

    Energy Technology Data Exchange (ETDEWEB)

    Schaffrath, Andreas [Gesellschaft fuer Anlagen- und Reaktorsicherheit mbH (GRS), Garching (Germany). Forschungszentrum

    2014-10-15

    Summary report on one session of the Annual Conference on Nuclear Technology held in Frankfurt, 6 to 8 May 2014: - Safety of Nuclear Installations - Methods, Analysis, Results: Backfittings for the Improvement of Safety and Efficiency. The other Sessions of the Key Topics 'Reactor Operation, Safety', 'Competence, Innovation, Regulation' and 'Fuel, Decommissioning and Disposal' will be covered in further issues of atw.

  12. Design and Construction of Operation Bridge for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Choi, Jinbok; Lee, Jongmin; Oh, Jinho

    2015-01-01

    The operation bridge contains a lower working deck mounted on a saddle that travels on rails. Upright members are mounted on the saddle to support the upper structure and two hoist monorails. The saddle contains an anti-derail system that is composed of seismic lugs and guide rollers. The operation bridge travels along the rails to transport the fuel assembly, irradiated object, and reactor components in the pools by using tools. Hoists are installed at the top girder. The hoist is suspended from the monorail by means of a motor driven trolley that runs along the monorail. Movements of hoist and trolley are controlled by using the control pendant switch. Processes of design and construction of the operation bridge for the research reactor are introduced. The operation bridge is designed under consideration of functions of handling equipment in the pool and operational limits for safety. Structural analysis is carried out to evaluate the structural integrity in the seismic events. Tests and inspections are also performed during fabrication and installation to confirm the function and safety of the operation bridge

  13. Nuclear Reactor RA Safety Report, Vol. 12, Accidents during reactor operation

    International Nuclear Information System (INIS)

    1986-11-01

    This volume includes description and analysis of typical accidents occurred during operation of RA reactor in chronological order, as follows: contamination of primary coolant circuit; leakage of heavy water from the primary coolant loop; contamination of vertical experimental channel; air contamination in the reactor building and loss of circulation of the primary coolant; failures of the vacuum pump and spent fuel packaging device; rupture of the spent fuel element cladding; dethronement's of capsule for irradiation of fuel element; rupture of the vertical experimental channel and contamination of the surroundings; swelling of a fuel element; appearance of deposits on the surface of the fuel elements cladding. The last chapter describes similar accidents occurred on nuclear reactors in the world [sr

  14. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4-8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  15. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000 kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4 -8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear , plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  16. The United States foreign research reactor spent nuclear fuel acceptance program: Proposal to modify the program

    International Nuclear Information System (INIS)

    Messick, C.E.

    2005-01-01

    The United States Department of Energy (DOE), in consultation with the Department of State (DOS), adopted the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel in May 1996. The policy was slated to expire in May 2009. However, in October 2003, a petition requesting a program extension was delivered to the United States Secretary of Energy from a group of research reactor operators from foreign countries. In April 2004, the Secretary directed DOE undertake an analysis, as required by the National Environmental Policy Act (NEPA), to consider potential extension of the Program. On December 1, 2004, a Federal Register Notice was issued approving the program extension. This paper discusses the findings from the NEPA analysis and the potential changes in the program that may result from implementation of the proposed changes. (author)

  17. Nuclear power reactor licensing and regulation in the United States

    International Nuclear Information System (INIS)

    Shapar, H.K.

    1979-01-01

    The report is devoted to four subjects: an explanation of the origins, statutory basis and development of the present regulatory system in the United States; a description of the various actions which must be taken by a license applicant and by the Nuclear Regulatory Commission before a nuclear power plant can be constructed and placed on-line, an account of the current regulatory practices followed by the US NRC in licensing nuclear power reactors; an identification of some of the 'lessons learned' from the Three Mile Island accident and some proposed regulatory and legislative solutions. (NEA) [fr

  18. A UKAEA review of gas-cooled reactors in the United Kingdom

    International Nuclear Information System (INIS)

    Heath, E.C.; Knowles, A.N.

    1983-01-01

    The commercial use of nuclear power for electrical generation commenced in the UK in the 1950s with the Calder Hall reactors. Based on this concept, eighteen commercial reactor units, with two further units outside the UK, were constructed and have been in operation for periods ranging from 10 to 19 years. The paper reviews this experience mainly from the aspects of safety and the achieved costs, which compare favourably with current figures for fossil fired generation. The further development of the gas-cooled system in the UK commenced with the construction of the Windscale AGR, which came into operation in 1962. This led to the ordering of 14 large commercial AGR units, 4 of which have been in service since 1976, 6 are at an advanced stage of construction and 4 are at an early stage of construction. The paper reviews the main safety features of the AGR and considers the costs, taking achieved costs for the units which are in service and a combination of historical costs and projected costs for the units under construction. Again a clear advantage over fossil fuelled stations is shown. The paper also includes a preliminary account of the use of the prototype AGR at Windscale for the series of experiments concerning plateout, over-temperature in the fuel and simulated fault transients in the core which were carried out earlier in 1981. (author)

  19. Understanding to requirements for educational level in qualification of reactor operators

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhou Limin

    2007-01-01

    Requirements for qualification of reactor operators in nuclear safety regulations were discussed in this paper. The new issue was described in the confirmation of education level of reactor operators. The understanding to the requirements for Educational Level in Qualification of Reactor Operators was provided according to Higher Education Law of the People's Republic of China. It was proposed to improve the confirmation of qualification of reactor operators as soon as possible. (authors)

  20. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    International Nuclear Information System (INIS)

    1995-04-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  1. Licensed operating reactors: Status summary report data as of December 31, 1992

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1993-03-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1992) and cumulative data, usually from the date of commercial operation. ne data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  2. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  3. Licensed operating reactors. Status summary report data as of December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  4. Method for optimizing the passive safety of nuclear reactor operation

    International Nuclear Information System (INIS)

    Schubert, W.

    1987-01-01

    In order to avoid severe accidents with secondary large-area damage, small nuclear reactor units have to be spatially distributed and placed, if possible, into buried containments which show a staggered arrangement. The opening of each containment has to be tightly closed. The containments can be provided with protective equipment against eruption and explosion which absorb the forces of pressure front effects, e.g. gas-filled bags or cushions which are attached to the side walls of the containment. Such an equipment mostly is only useful for a single pressure front. Additional walls with numerous wall penetrations are also suited for absorbing several not too strong pressure fronts. For the maximum credible accident (MCA) dry sand has to be kept at hand in appropriate containers over the containment so that an uncontrollable nuclear reactor beyond repair can be 'buried' in a few seconds. (orig./HP) [de

  5. Operating experiences of reactor shutdown system at MAPS

    International Nuclear Information System (INIS)

    Kotteeswaran, T.J.; Subramani, V.A.; Hariharan, K.

    1997-01-01

    The reactors in Madras Atomic Power Station (MAPS), Kalpakkam are Pressurised Heavy Water Reactors (PHWR) similar to RAPS, Kota. The moderator heavy water is pumped into the calandria from dump tank to make the reactor critical. Later with the calandria level held constant at 92% FT, the further power changes are being done with the movement of adjuster rods. The moderator is held in calandria by means of helium gas pressure differential between top of calandria and dump tank located below. The shutdown of the reactor is effected by dumping the moderator water to dump tank by fast equalizing of helium gas pressure. In the revised mode of operation of moderator circuit after the moderator inlet manifold failure, the dump timing was observed to be more compared to the normal value. This was investigated and observed to be due to accumulation of D 2 O in the gas space above dump valves, which was affecting the helium equalizing flow. Also some of Indicating Alarm Meters (IAM) in protective system initiating the trip signals have failed in the unsafe mode. They have been modified to avoid the recurrence of the failures. (author)

  6. Startup operation of Browns Ferry's 1152-MW nuclear units

    International Nuclear Information System (INIS)

    Calhoun, J.R.; Green, H.J.; Beers, R.B.

    1975-01-01

    An overview is presented of startup operation for the Browns Ferry-1 reactor, and comparisons are made with the startup of Browns Ferry-2. Included are comments on the selection of the BWR type steam supply system, reactor fueling, problems encountered, and plant availability

  7. Systems for aiding operators at university-owned research reactors in Japan

    International Nuclear Information System (INIS)

    Nishihara, H.; Kimura, Y.; Shibata, T.

    1984-01-01

    University-owned research reactors are operated for various purposes, and small disturbances may arise from various experimental facilities. Also not uniform are the technical levels of operators who range from supervised-students to reactor physicists. Considerable efforts are therefore devoted to the preventive maintainance. With these boundary conditions imposed, systems for aiding operators are designed at these research reactor facilities. (author)

  8. Building reactor operator sustain expert system with C language integrated production system

    International Nuclear Information System (INIS)

    Ouyang Qin; Hu Shouyin; Wang Ruipian

    2002-01-01

    The development of the reactor operator sustain expert system is introduced, the capability of building reactor operator sustain expert system is discussed with C Language Integrated Production System (Clips), and a simple antitype of expert system is illustrated. The limitation of building reactor operator sustain expert system with Clips is also discussed

  9. Safe Operation of Critical Assemblies and Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-05-15

    This Manual is provided as a guide to the safe operation of critical assemblies and small research reactors. It is intended that it should be used by all authorities and persons concerned with, or responsible for, the use of such equipment, in addition to the scientists and technologists who are actually working with, or operating it. It is suggested that it will be of use to those wishing to design and manufacture, or purchase, critical assemblies or research reactors, as well as those already in possession of them, and that it will prove particularly helpful to those users who have no direct access to other collected sources of information. This Manual is not a set of rules or a code of practice, but a series of recommendations which must be interpreted with scientific judgement in their application to any particular problem. The guiding principles are given from which good operational procedures may be established and improved. The promulgation of rigid standards is both impossible and undesirable at the present time, since the topics discussed form part of a rapidly growing science and technology. Therefore, any recommendations made should not be used to restrict or inhibit future developments. The Manual is intended mainly for use in those Member States where there has been little experience in the operation of critical assemblies and research reactors. It has been compounded from the best practices which exist in Member States having a large amount of such experience, so that nothing in it should conflict with the best practices to be encountered in the field of safe operation.

  10. Safe Operation of Critical Assemblies and Research Reactors

    International Nuclear Information System (INIS)

    1961-01-01

    This Manual is provided as a guide to the safe operation of critical assemblies and small research reactors. It is intended that it should be used by all authorities and persons concerned with, or responsible for, the use of such equipment, in addition to the scientists and technologists who are actually working with, or operating it. It is suggested that it will be of use to those wishing to design and manufacture, or purchase, critical assemblies or research reactors, as well as those already in possession of them, and that it will prove particularly helpful to those users who have no direct access to other collected sources of information. This Manual is not a set of rules or a code of practice, but a series of recommendations which must be interpreted with scientific judgement in their application to any particular problem. The guiding principles are given from which good operational procedures may be established and improved. The promulgation of rigid standards is both impossible and undesirable at the present time, since the topics discussed form part of a rapidly growing science and technology. Therefore, any recommendations made should not be used to restrict or inhibit future developments. The Manual is intended mainly for use in those Member States where there has been little experience in the operation of critical assemblies and research reactors. It has been compounded from the best practices which exist in Member States having a large amount of such experience, so that nothing in it should conflict with the best practices to be encountered in the field of safe operation.

  11. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience

  12. Non-Power Reactor Operator Licensing Examiner Standards

    International Nuclear Information System (INIS)

    1994-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR Part 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, this standard will be revised periodically to accommodate comments and reflect new information or experience

  13. Sustainable operations in nuclear research reactors. A bibliographical study

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Rodrigues de Aquino, Afonso; Marotti de Mello, Adriana; Tromboni de Souza Nascimento, Paulo

    2017-01-01

    Sustainability is gaining prominence in the area of operations management. By means of a bibliographical research, we identified in literature sustainable operations carried out by operating organizations of nuclear research reactors. The methodology applied consisted in gathering material, descriptive analysis, selection of analytical categories and evaluation of the material collected. The collection of material was performed by a search made on academic and nuclear databases, with keywords structured for the subject of the research. The collected material was analysed and analytical categories on the theme sustainable operations were established. The evaluation of the collected material resulted in references accepted for the study, classified according to the pre-established analytical categories. The results were significant. From then on, a theoretical review on the topic under study was structured, based on pre-defined analytical categories. Thus, we were able to identify gaps in the literature and propose new studies on the subject.

  14. Non-Power Reactor Operator Licensing Examiner Standards. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

  15. Sustainable operations in nuclear research reactors. A bibliographical study

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo; Rodrigues de Aquino, Afonso [Cidade Univ., Sao Paolo (Brazil). Inst. de Pesquisas Energeticas e Nucleares; Marotti de Mello, Adriana [Sao Paolo Univ. (Brazil). Faculdade de Economia; Tromboni de Souza Nascimento, Paulo [Sao Paolo Univ. (Brazil). Faculdade de Economia Administracao e Contabilidade

    2017-10-15

    Sustainability is gaining prominence in the area of operations management. By means of a bibliographical research, we identified in literature sustainable operations carried out by operating organizations of nuclear research reactors. The methodology applied consisted in gathering material, descriptive analysis, selection of analytical categories and evaluation of the material collected. The collection of material was performed by a search made on academic and nuclear databases, with keywords structured for the subject of the research. The collected material was analysed and analytical categories on the theme sustainable operations were established. The evaluation of the collected material resulted in references accepted for the study, classified according to the pre-established analytical categories. The results were significant. From then on, a theoretical review on the topic under study was structured, based on pre-defined analytical categories. Thus, we were able to identify gaps in the literature and propose new studies on the subject.

  16. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    Energy Technology Data Exchange (ETDEWEB)

    Hastowo, Hudi; Tarigan, Alim [Multipurpose Reactor Center, National Nuclear Energy Agency of the Republic of Indonesia (PRSG-BATAN), Kawasan PUSPIPTEK Serpong, Tangerang (Indonesia)

    1999-08-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U{sub 3}O{sub 8}-Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  17. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    International Nuclear Information System (INIS)

    Hastowo, Hudi; Tarigan, Alim

    1999-01-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U 3 O 8 -Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  18. Ten years's reactor operation at the Technical University Zittau - operation report

    International Nuclear Information System (INIS)

    Konschak, K.

    1990-01-01

    The Zittau Training and Research Reactor ZLFR is in use for purposes of teaching the engineers who will operate the nuclear power plants in the GDR since 10 years. Since commissioning it was started up more than 1600 times, approximately two thirds of the start-ups being utilized for purposes of teaching. A number of teaching experiments were installed that demonstrate fundamental technological processes in nuclear reactors in a manner easy to understand. The high level of nuclear safety manifests itself, among other things, in extremely low radiation exposures of the operating personal and the persons to be trained. (author)

  19. A novel approach to the design and operation scheduling of heterogeneous catalytic reactors

    International Nuclear Information System (INIS)

    Ghodasara, Kamlesh; Smith, Robin; Hwang, Sungwon

    2014-01-01

    A number of studies have been conducted to reduce the overall level of catalyst deactivation in heterogeneous catalytic reactors, and improve the performance of reactors, such as yield, conversion or selectivity. The methodology generally includes optimization of the following: (1) operating conditions of the reaction system, such as feed temperature, normal operating temperature, pressure, and composition of feed streams; (2) reactor design parameters, such as dimension of the reactor, side stream distribution along the axis of the reactor beds, the mixing ratio of inert catalyst at each bed; and (3) catalyst design parameters, such as the pore size distribution across the pellet, active material distribution, size and shape of the catalyst, etc. Few studies have examined optimization of the overall catalyst reactor performance throughout the catalyst lifetime, considering catalyst deactivation. Furthermore, little attention has been given to the impact of various configurations of reactor networks and scheduling of the reactor operation (i.e., online and offline-regeneration) on the overall reactor performance throughout the catalyst lifetime. Therefore, we developed a range of feasible sequences of reactors and scheduling of reactors for operation and regeneration, and compared the overall reactor performance of multiple cases. Furthermore, a superstructure of reactor networks was developed and optimized to determine the optimum reactor network that shows the maximum overall reactor performance. The operating schedule of each reactor in the network was considered further. Lastly, the methodology was illustrated using a case study of the MTO (methanol to olefin) process

  20. Progress of the United States foreign research reactor spent nuclear fuel acceptance program

    International Nuclear Information System (INIS)

    Huizenga, D.G.; Clapper, M.; Thrower, A.W.

    2002-01-01

    The United States Department of Energy (DOE), in consultation with the Department of State (DOS), adopted the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel in May 1996. To date, the Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program has completed 23 shipments. Almost 5000 spent fuel assemblies from eligible research reactors throughout the world have been accepted into the United States under this program. Over the past year, another cross-country shipment of fuel was accomplished, as well as two additional shipments in the fourth quarter of calendar year 2001. These shipments attracted considerable safeguards oversight since they occurred post September 11. Recent guidance from the Nuclear Regulatory Commission (NRC) pertaining to security and safeguards issues deals directly with the transport of nuclear material. Since the Acceptance Program has consistently applied above regulatory safety enhancements in transport of spent nuclear fuel, this guidance did not adversely effect the Program. As the Program draws closer to its termination date, an increased number of requests for program extension are received. Currently, there are no plans to extend the policy beyond its current expiration date; therefore, eligible reactor operators interested in participating in this program are strongly encouraged to evaluate their inventory and plan for future shipments as soon as possible. (author)