WorldWideScience

Sample records for reactor operator performance

  1. Research about reactor operator's personality characteristics and performance

    International Nuclear Information System (INIS)

    Wei Li; He Xuhong; Zhao Bingquan

    2003-01-01

    To predict and evaluate the reactor operator's performance by personality characteristics is an important part of reactor operator safety assessment. Using related psychological theory combined with the Chinese operator's fact and considering the effect of environmental factors to personality analysis, paper does the research about the about the relationships between reactor operator's performance and personality characteristics, and offers the reference for operator's selection, using and performance in the future. (author)

  2. Research about reactor operator's personability characteristics and performance

    Energy Technology Data Exchange (ETDEWEB)

    Wei Li; He Xuhong; Zhao Bingquan [Tsinghua Univ., Institute of Nuclear Energy Technology, Beijing (China)

    2003-03-01

    To predict and evaluate the reactor operator's performance by personality characteristics is an important part of reactor operator safety assessment. Using related psychological theory combined with the Chinese operator's fact and considering the effect of environmental factors to personality analysis, paper does the research about the about the relationships between reactor operator's performance and personality characteristics, and offers the reference for operator's selection, using and performance in the future. (author)

  3. A Framework for Human Performance Criteria for Advanced Reactor Operational Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Jacques V Hugo; David I Gertman; Jeffrey C Joe

    2014-08-01

    This report supports the determination of new Operational Concept models needed in support of the operational design of new reactors. The objective of this research is to establish the technical bases for human performance and human performance criteria frameworks, models, and guidance for operational concepts for advanced reactor designs. The report includes a discussion of operating principles for advanced reactors, the human performance issues and requirements for human performance based upon work domain analysis and current regulatory requirements, and a description of general human performance criteria. The major findings and key observations to date are that there is some operating experience that informs operational concepts for baseline designs for SFR and HGTRs, with the Experimental Breeder Reactor-II (EBR-II) as a best-case predecessor design. This report summarizes the theoretical and operational foundations for the development of a framework and model for human performance criteria that will influence the development of future Operational Concepts. The report also highlights issues associated with advanced reactor design and clarifies and codifies the identified aspects of technology and operating scenarios.

  4. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    1980-09-01

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions [sr

  5. Overcoming the effects of stress on reactor operator performance

    International Nuclear Information System (INIS)

    He Xuhong; Wei Li; Zhao Bingquan

    2003-01-01

    Reactor operators may be exposed to significant levels of stress during plant emergencies and their performance may be affected by the stress. This paper first identified the potential sources of stress in the nuclear power plant, then discussed the ways in which stress is likely to affect the reactor operators, and finally identified several training approaches for reducing or eliminating stress effects. The challenges for effective stress reducing training may seem daunting, yet the challenges are real and must be addressed. This paper reviewed researches in training design, knowledge and skill acquisition, and training transfer point to a number of strategies that can be used to address these challenges and lead to more effective training and development. (author)

  6. Overcoming the effects of stress on reactor operator performance

    Energy Technology Data Exchange (ETDEWEB)

    He Xuhong; Wei Li; Zhao Bingquan [Tsinghua Univ., Nuclear Power Plant Simulation Training Center, Beijing (China)

    2003-03-01

    Reactor operators may be exposed to significant levels of stress during plant emergencies and their performance may be affected by the stress. This paper first identified the potential sources of stress in the nuclear power plant, then discussed the ways in which stress is likely to affect the reactor operators, and finally identified several training approaches for reducing or eliminating stress effects. The challenges for effective stress reducing training may seem daunting, yet the challenges are real and must be addressed. This paper reviewed researches in training design, knowledge and skill acquisition, and training transfer point to a number of strategies that can be used to address these challenges and lead to more effective training and development. (author)

  7. Value addition initiatives for CANDU reactor operation performance

    International Nuclear Information System (INIS)

    Chugh, V.; Parmar, R.; Schut, J.; Sherin, J.; Xie, H.; Zobin, D.

    2013-01-01

    Recently, AMEC NSS initiated projects for CANDU® station performance engineering with potentially high returns for the utilities. This paper discusses three initiatives. Firstly, optimization of instrument calibration interval from 1 to 3 years will reduce time commitments on the maintenance resources on top of financial savings ~$3,500 per instrument. Secondly, reactor thermal power uncertainty assessment shows the level of operation which is believed to have an over-conservative margin that can be used to increase power by up to 0.75%. Finally, as an alternative means for controlling Reactor Inlet Header Temperature (RIHT), physical modifications to the High Pressure (HP) feedwater heaters can be useful for partially recovering RIHT resulting in increased production by 10-12 MWe. (author)

  8. Reactor operational transient analysis

    International Nuclear Information System (INIS)

    Shin, W.K.; Chae, S.K.; Han, K.I.; Yang, K.S.; Chung, H. D.; Kim, H.G.; Moon, H.J.; Ryu, Y.H.

    1983-01-01

    To build up efficient capability of safety review and inspection for the nuclear power plants, four area of studies have performed as follows: 1) In order to search the most optimized operating method during load follow operating schemes, automatic control and normal control, are compared each other under the CAOC condition. The analysis performed by DDID code has shown that the reactor has to be controlled by the operator manually during load follow operation. 2) Through the sensitivity analysis by COBRA code, the operating parameters, such as coolant pressure, flow rate, inlet temperature, and power distribution are shown to be important to the determination of DNBR. Expecially, inlet temperature of primary coolant system is appeared as the most senstive parameter on DNBR. 3) FRAPCON code is adapted to study the sensitivity of several operational parameters on the mechanical properties of reactor fuel rod. 4) The calculations procedure which is required to be obtained the neutron fluence at the reactor vessel and the spectrum at the surveillance capsule is established. The results of computation are conpared with those of FSAR and SWRI report and proved its applicability to reactor surveillance program. (Author)

  9. Reactor operation

    CERN Document Server

    Shaw, J

    2013-01-01

    Reactor Operation covers the theoretical aspects and design information of nuclear reactors. This book is composed of nine chapters that also consider their control, calibration, and experimentation.The opening chapters present the general problems of reactor operation and the principles of reactor control and operation. The succeeding chapters deal with the instrumentation, start-up, pre-commissioning, and physical experiments of nuclear reactors. The remaining chapters are devoted to the control rod calibrations and temperature coefficient measurements in the reactor. These chapters also exp

  10. Reactor operation monitor

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1982-01-01

    Purpose: To improve the working performance of a reactor by extending the range for the power conditioning due to the control rod operation and flow rate control. Constitution: The results of calculations for the power distribution and the burn-up degree distribution of the reactor core from a reactor performance computer that processes each of measuring signals in a nuclear power plant are used as the inputs for a computing device of the fuel rod power hysteresis to form the power hysteresis for each of the fuel rods up to the present time. The data are used as the inputs for the computing device of the fuel rod performance index, and the fuel rod performance index representing the critical values for the stresses in the fuel rod cladding tubes and the critical values for the duration of the stresses determined from the power hysteresis and the burn-up degree of the fuel rod are calculated for each of the fuel rods. Accordingly, the power conditioning can be carried out upon power-up in the reactor while monitoring the fuel rod performance index f(t) for each of the fuel assemblies, whereby the range for the power conditioning due to the control rod operation and the flow rate control can be extended relative to fuel assemblies in which f(t) is smaller than 1. (Yoshino, Y.)

  11. Operational limitations of light water reactors relating to fuel performance

    International Nuclear Information System (INIS)

    Cheng, H.S.

    1976-07-01

    General aspects of fuel performance for typical Boiling and Pressurized Water Reactors are presented. Emphasis is placed on fuel failures in order to make clear important operational limitations. A discussion of fuel element designs is first given to provide the background information for the subsequent discussion of several fuel failure modes that have been identified. Fuel failure experiences through December 31, 1974, are summarized. The operational limitations that are required to mitigate the effects of fuel failures are discussed

  12. Experience in using a research reactor for the training of power reactor operators

    International Nuclear Information System (INIS)

    Blotcky, A.J.; Arsenaut, L.J.

    1972-01-01

    A research reactor facility such as the one at the Omaha Veterans Administration Hospital would have much to offer in the way of training reactor operators. Although most of the candidates for the course had either received previous training in the Westinghouse Reactor Operator Training Program, had operated nuclear submarine reactors or had operated power reactors, they were not offered the opportunity to perform the extensive manipulations of a reactor that a small research facility will allow. In addition the AEC recommends 10 research reactor startups per student as a prerequisite for a cold operator?s license and these can easily be obtained during the training period

  13. Operating performance of the prototype heavy water reactor Fugen

    International Nuclear Information System (INIS)

    1984-01-01

    Since the full scale operation was started in March, 1979, the ATR Fugen power station has been verifying the performance and reliability of the machinery and equipment, uranium-plutonium mixed oxide fuel and so on, and obtaining the technical prospect for putting ATRs in practical use by accumulating operation and maintenance techniques, through about five years of operation. In this report, the operational results of the Fugen power station are described. Fugen is a heavy water-moderated, boiling light water-cooled, pressure tube type reactor with 165 MWe output. As of the end of March, 1984, the total generated electric power was about 4.3 billion kWh, and the operation time was about 27,000 hours. The mean capacity ratio reached 58.8%. During the operation period, troubles including plant shutdown occurred eight times, but generally the performance and reliability of the machinery and equipment have been good. 580 fuels including 284 MOX fuels have been charged, but fuel breaking did not occur at all. The consumption of heavy water and the leak of tritium did not cause problem. The management of the core and fuel, the management of maintenance, the quality control of cooling water and heavy water, radiation control and the management of wastes are reported. (Kako, I.)

  14. Nuclear reactor physics course for reactor operators

    International Nuclear Information System (INIS)

    Baeten, P.

    2006-01-01

    The education and training of nuclear reactor operators is important to guarantee the safe operation of present and future nuclear reactors. Therefore, a course on basic 'Nuclear reactor physics' in the initial and continuous training of reactor operators has proven to be indispensable. In most countries, such training also results from the direct request from the safety authorities to assure the high level of competence of the staff in nuclear reactors. The aim of the basic course on 'Nuclear Reactor Physics for reactor operators' is to provide the reactor operators with a basic understanding of the main concepts relevant to nuclear reactors. Seen the education level of the participants, mathematical derivations are simplified and reduced to a minimum, but not completely eliminated

  15. Improvement of pulsing operation performance in the Nuclear Safety Research Reactor (NSRR)

    International Nuclear Information System (INIS)

    Kobayasi, S.; Ishijima, K.; Tanzawa, S.; Fujishiro, T.; Horiki, O.

    1990-01-01

    The Nuclear Safety Research Reactor (NSRR) is one of the TRIGA-type research reactors widely used in the world, and has mainly been used for studying reactor fuel behaviour during postulated reactivity-initiated accidents (RIAs). Its limited pulsing operation capability, however, could produce only a power burst from low power level simulating an RIA event from essentially zero power level. A computerized automatic reactor control system was developed and installed in the NSRR to simulate a wide range of abnormal events in nuclear power plants. This digitalized reactor control system requires no manipulation of the control rods by reactor operators during the course of the pulsing operation. Using this fully automated operation system, a variety of power transients such as power ramping, power bursts from high power level, and so on were made possible with excellent stability and safety. The present modification work in the NSRR and its fruitful results indicate new possibilities in the utilization of the TRIGA type research reactor

  16. CANDU reactor experience: fuel performance

    International Nuclear Information System (INIS)

    Truant, P.T.; Hastings, I.J.

    1985-07-01

    Ontario Hydro has more than 126 reactor-years experience in operating CANDU reactors. Fuel performance has been excellent with 47 000 channel fuelling operations successfully completed and 99.9 percent of the more than 380 000 bundles irradiated operating as designed. Fuel performance limits and fuel defects have had a negligible effect on station safety, reliability, the environment and cost. The actual incapability charged to fuel is less than 0.1 percent over the stations' lifetimes, and more recently has been zero

  17. Performance of a continuously operated flocculent sludge UASB reactor with slaughterhouse wastewater

    Energy Technology Data Exchange (ETDEWEB)

    Sayed, S.; Zeeuw, W. de

    1988-01-01

    This investigation was carried out to assess the performance of a continuously operated, one-stage, flocculent sludge upflow anaerobic sludge blanket (UASB) reactor treating slaughterhouse wastewater at a process temperature of 30/sup 0/C. The results indicate that the type of substrate ingredients, coarse suspended solids, colloidal and soluble compounds in the wastewater, affect the performance of the reactor because of different mechanisms involved in their removal and their subsequent conversion into methane. Two different mechanisms are distinguished. An entrapment mechanism prevails for the elimination of coarse suspended solids while an adsorption mechanism is involved in the removal of the colloidal and soluble fractions of the wastewater. The results obtained lead to the conclusion that the system can satisfactorily handle organic space loads up to 5 kg COD m/sup -3/ day/sup -1/ at 30/sup 0/C. The data indicate, however, that continuing heavy accumulation of substrate components in the reactor is detrimental to the stability of the anaerobic treatment process as the accumulation can lead to sludge flotation and consequently to a complete loss of the active biomass from the reactor.

  18. Twenty years of health physics research reactor operation

    International Nuclear Information System (INIS)

    Sims, C.S.; Gilley, L.W.

    1983-01-01

    The Health Physics Research Reactor at the Oak Ridge National Laboratory has been in regular use for more than two decades. Safe operation of this fast reactor over this extended period indicates that (1) fundamental design, (2) operational procedures, (3) operator training and performance, (4) maintenance activites, and (5) management have all been eminently satisfactory. The reactor and its uses are described, the operational history and significant events are reviewed, and operational improvements and maintenance are discussed

  19. PUSPATI Triga Reactor - First year in operation

    International Nuclear Information System (INIS)

    Nahrul Khair Rashid.

    1983-01-01

    First year operation of RTP reactor was mostly devoted to making in house training, setting up and testing the facilities in preparation for more routine operations. Generally the operations are categorized into 4 main purposes; experiment of research, teaching and training, demonstration, and testing and maintenance. These four purposes are elaborated in detail. Additions and modifications were performed in order to improve the safety of reactor operation. (A.J.)

  20. The qualification of reactor operators

    International Nuclear Information System (INIS)

    Lima, J.M. de; Soares, H.V.

    1981-01-01

    The qualification and performance of nuclear power personnel have an important influence on the availability and safety operation of these plants. This paper describes the Brazilian rules and norms established by the CNEN-Brazilian Atomic Energy Comission, as well as policy of other countries concerning training requirements and experiences of nuclear power reactor operators. Some coments are made about the im pact of the march 1979 Three Mile Island accident on upgrading the reactor training requirements in U.S.A. and its international implication. (Author) [pt

  1. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  2. Catalytic performance improvement of styrene hydrogenation in trickle bed reactor by using periodic operation

    International Nuclear Information System (INIS)

    Wongkia, Atittahn; Praserthdam, Piyasan; Assabumrungrat, Suttichai; Suriye, Kongkiat; Nonkhamwong, Anuwat

    2013-01-01

    We investigated the catalytic performance improvement of styrene hydrogenation in a trickle bed reactor by using periodic operation. The effects of cycle period and split on relative conversion, which is defined as styrene conversion obtained from periodic operation over that from steady state operation, were examined at various operating conditions including gas and average liquid flow rates, pressure and temperature. The experimental results reveal that both cycle period and split have strong influence on the catalytic performance. The fast mode (short cycle period) is a favorable condition. The improvement by the periodic operation becomes less pronounced for operations at high average liquid flow rate, pressure and temperature. From this study, a maximum improvement of styrene conversion of 18% is observed

  3. Catalytic performance improvement of styrene hydrogenation in trickle bed reactor by using periodic operation

    Energy Technology Data Exchange (ETDEWEB)

    Wongkia, Atittahn; Praserthdam, Piyasan; Assabumrungrat, Suttichai [Chulalongkorn University, Bangkok (Thailand); Suriye, Kongkiat; Nonkhamwong, Anuwat [SCG Chemicals Co. Ltd., Bangkok (Thailand)

    2013-03-15

    We investigated the catalytic performance improvement of styrene hydrogenation in a trickle bed reactor by using periodic operation. The effects of cycle period and split on relative conversion, which is defined as styrene conversion obtained from periodic operation over that from steady state operation, were examined at various operating conditions including gas and average liquid flow rates, pressure and temperature. The experimental results reveal that both cycle period and split have strong influence on the catalytic performance. The fast mode (short cycle period) is a favorable condition. The improvement by the periodic operation becomes less pronounced for operations at high average liquid flow rate, pressure and temperature. From this study, a maximum improvement of styrene conversion of 18% is observed.

  4. Fast reactor operating experience gained in Russia: Analysis of anomalies and abnormal operation cases

    International Nuclear Information System (INIS)

    Ashurko, Y.M.; Baklushin, R.P.; Zagorulko, Y.I.; Ivanenko, V.N.; Matveyev, V.P.; Vasilyev, B.A.

    2000-01-01

    Review of various anomalous events and abnormal operation experience gained in the process of Russian fast reactors operation is given in the paper. The main information refers to the BN-600 demonstration reactor operation. Statistical data on sodium leaks and steam generator failures are presented, and sources of these events and countermeasures taken to avoid their appearance on the operating reactors as well as related changes made in the BN-800 reactor design are considered. In the paper, some features of impurities behaviour are considered in various modes of the BN-600 reactor operation. Information is given on the impurities ingress into the circuits, on abnormal situation emerged in the process of the BN-600 reactor operation and its probable cause. Information is presented on the event related to the increased torque of the BN-600 reactor central rotating column and repair works performed. (author)

  5. Fuel management for TRIGA reactor operators

    International Nuclear Information System (INIS)

    Totenbier, R.E.; Levine, S.H.

    1980-01-01

    One responsibility of the Supervisor of Reactor Operations is to follow the TRIGA core depletion and recommend core loading changes for refueling and special experiments. Calculations required to analyze such changes normally use digital computers and are extremely difficult to perform for one who is not familiar with computer language and nuclear reactor diffusion theory codes. The TRICOM/SCRAM program developed to perform such calculations for the Penn State TRIGA Breazeale Reactor (PSBR), has a very simple input format and is one which can be used by persons having no knowledge of computer codes. The person running the program need not understand computer language such as Fortran, but should be familiar with reactor core geometry and effects of loading changes. To further simplify the input requirements but still allow for all of the studies normally needed by the reactor operations supervisor, the options required for input have been isolated to two. Given a master deck of computer cards one needs to change only three cards; a title card, core energy history information card and one with core changes. With this input, the program can provide individual fuel element burn-up for a given period of operation and the k eff of the core. If a new loading is desired, a new master deck containing the changes is also automatically provided. The life of a new core loading can be estimated by feeding in projected core burn-up factors and observing the resulting loss in individual fuel elements. The code input and output formats have now been made sufficiently convenient and informative as to be incorporated into a standard activity for the Reactor Operations Supervisor. (author)

  6. Independent verification: operational phase liquid metal breeder reactors

    International Nuclear Information System (INIS)

    Bourne, P.B.

    1981-01-01

    The Fast Flux Test Facility (FFTF) recently achieved 100-percent power and now is in the initial stages of operation as a test reactor. An independent verification program has been established to assist in maintaining stable plant conditions, and to assure the safe operation of the reactor. Independent verification begins with the development of administrative procedures to control all other procedures and changes to the plant configurations. The technical content of the controlling procedures is subject to independent verification. The actual accomplishment of test procedures and operational maneuvers is witnessed by personnel not responsible for operating the plant. Off-normal events are analyzed, problem reports from other operating reactors are evaluated, and these results are used to improve on-line performance. Audits are used to confirm compliance with established practices and to identify areas where individual performance can be improved

  7. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    Energy Technology Data Exchange (ETDEWEB)

    Hastowo, Hudi; Tarigan, Alim [Multipurpose Reactor Center, National Nuclear Energy Agency of the Republic of Indonesia (PRSG-BATAN), Kawasan PUSPIPTEK Serpong, Tangerang (Indonesia)

    1999-08-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U{sub 3}O{sub 8}-Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  8. Operation experience of the Indonesian multipurpose research reactor RSG-GAS

    International Nuclear Information System (INIS)

    Hastowo, Hudi; Tarigan, Alim

    1999-01-01

    RSG-GAS is a multipurpose research reactor with nominal power of 30 MW, operated by BATAN since 1987. The reactor is an open pool type, cooled and moderated with light water, using the LEU-MTR fuel element in the form of U 3 O 8 -Al dispersion. Up to know, the reactor have been operated around 30,000 hours to serve the user. The reactor have been utilized to produce radioisotope, neutron beam experiments, irradiation of fuel element and its structural material, and reactor physics experiments. This report will explain in further detail concerning operational experience of this reactor, i.e. reactor operation data, reactor utilization, research program, technical problems and it solutions, plant modification and improvement, and development plan to enhance better reactor operation performance and its utilization. (author)

  9. Reactor operation method

    International Nuclear Information System (INIS)

    Osumi, Katsumi; Miki, Minoru.

    1979-01-01

    Purpose: To prevent stress corrosion cracks by decreasing the dissolved oxygen and hydrogen peroxide concentrations in the coolants within a reactor container upon transient operation such as at the start-up or shutdown of bwr type reactors. Method: After a condensate has been evacuated, deaeration operation is conducted while opening a main steam drain line, as well as a main steam separation valve and a by-pass valve in a turbine by-pass line connecting the main steam line and the condenser without by way of a turbine, and the reactor is started-up by the extraction of control rods after the concentration of dissolved oxygen in the cooling water within a pressure vessel has been decreased below a predetermined value. Nuclear heating is started after the reactor water has been increased to about 150 0 C by pump heating after the end of the deaeration operation for preventing the concentration of hydrogen peroxide and oxygen in the reactor water from temporarily increasing immediately after the start-up. The corrosive atmosphere in the reactor vessel can thus be moderated. (Horiuchi, T.)

  10. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  12. 14th Biennial conference on reactor operating experience plant operations: The human element

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Separate abstracts were prepared for the papers presented in the following areas of interest: enhancing operator performance; structured approaches to maintenance standards and reliability-centered maintenance; human issues in plant operations and management; test, research, and training reactor utilization; methods and applications of root-cause analysis; emergency operating procedure enhancement programs; test, research, and training reactor upgrades; valve maintenance and diagnostics; recent operating experiences; and current maintenance issues

  13. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Milosevic, M.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.

    1981-12-01

    The RA nuclear reactor stopped operation after March 1979 campaign due to appearance of aluminium oxyhydrates deposits on the surface of fuel element claddings. Relevant decisions of the Sanitary inspection body of the Ministry of health and the Director General of the 'Boris Kidric' Institute of nuclear sciences, Vinca, banned further reactor operation until reasons caused aluminium oxyhydrates deposition are investigated and removed to enable regular reactor operation. Until the end of 1979 and during 1980, after a series of analyses and findings that caused cease of reactor operation, all the preparatory actions needed for restart were performed. Due to the fact that there is no emergency cooling system and no appropriate filtering system at the reactor, and according to the new regulations about start up of nuclear facilities, the Sanitary inspection body made a decision about temporary licence for reactor start-up meaning performance of the 'zero experiment' limiting the operating power to 1% of the nominal power. Accordingly the reactor was restarted on January 21 1981. Criticality was reached with the core made of 80% enriched fuel elements only. After the experiment was finished by the end of March a permission was demanded for operation at higher power levels at full power. Taking into account the state of the reactor components the operating licence was issued limiting the power to 2 MW until reconstruction of the ventilation system and construction of the emergency cooling system are fulfilled. Program of testing operation started on September 15 1981 increasing gradually the operating power. Thus the reactor was operated at 2 MW power for 15 days during November and December. The total production achieved in 1981 was 1698 MWh. This enabled isotopes production at the reactor during last two months. Control and maintenance of the reactor components and systems was done regularly and efficiently within limits imposed by availability of spare parts. The

  14. A novel approach to the design and operation scheduling of heterogeneous catalytic reactors

    International Nuclear Information System (INIS)

    Ghodasara, Kamlesh; Smith, Robin; Hwang, Sungwon

    2014-01-01

    A number of studies have been conducted to reduce the overall level of catalyst deactivation in heterogeneous catalytic reactors, and improve the performance of reactors, such as yield, conversion or selectivity. The methodology generally includes optimization of the following: (1) operating conditions of the reaction system, such as feed temperature, normal operating temperature, pressure, and composition of feed streams; (2) reactor design parameters, such as dimension of the reactor, side stream distribution along the axis of the reactor beds, the mixing ratio of inert catalyst at each bed; and (3) catalyst design parameters, such as the pore size distribution across the pellet, active material distribution, size and shape of the catalyst, etc. Few studies have examined optimization of the overall catalyst reactor performance throughout the catalyst lifetime, considering catalyst deactivation. Furthermore, little attention has been given to the impact of various configurations of reactor networks and scheduling of the reactor operation (i.e., online and offline-regeneration) on the overall reactor performance throughout the catalyst lifetime. Therefore, we developed a range of feasible sequences of reactors and scheduling of reactors for operation and regeneration, and compared the overall reactor performance of multiple cases. Furthermore, a superstructure of reactor networks was developed and optimized to determine the optimum reactor network that shows the maximum overall reactor performance. The operating schedule of each reactor in the network was considered further. Lastly, the methodology was illustrated using a case study of the MTO (methanol to olefin) process

  15. Operational safety evaluation for minor reactor accidents

    International Nuclear Information System (INIS)

    Wang, O.S.

    1981-01-01

    The purpose of this paper is to address a concern of applying conservatism in analysing minor reactor incidents. A so-called ''conservative'' safety analysis may exaggerate the system responses and result in a reactor scram tripped by the reactor protective system (RPS). In reality, a minor incident may lead the reactor to a new thermal hydraulic steady-state without scram, and the mitigation or termination of the incident may entirely depend on operator actions. An example on a small steamline break evaluation for a pressurized water reactor recently investigated by the staff at the Washington Public Power Supply System is presented to illustrate this point. A safety evaluation using mainly the safety-related systems to be consistent with the conservative assumptions used in the Safety Analysis Report was conducted. For comparison, a realistic analysis was also performed using both the safety- and control-related systems. The analyses were performed using the RETRAN plant simulation computer code. The ''conservative'' safety analysis predicts that the incident can be turned over by the RPS scram trips without operator intervention. However, the realistic analysis concludes that the reactor will reach a new steady-state at a different plant thermal hydraulic condition. As a result, the termination of the incident at this stage depends entirely on proper operator action. On the basis of this investigation it is concluded that, for minor incidents, ''conservative'' assumptions are not necessary, sometimes not justifiable. A realistic investigation from the operational safety point of view is more appropriate. It is essential to highlight the key transient indications for specific incident recognition in the operator training program

  16. Operation management of the prototype heavy water reactor 'Fugen'

    International Nuclear Information System (INIS)

    Muramatsu, Akira; Takei, Hiroaki; Iwanaga, Shigeru; Noda, Masao; Hara, Hidemi

    1983-01-01

    The advanced thermal reactor Fugen power station has continued almost smooth operation since it began the full scale operation as the first homemade power reactor in Japan in March, 1979. In the initial period of operation, some troubles were experienced, but now, it can be said that the operational techniques of heavy water-moderated, boiling light water-cooled, pressure tube type reactors have been established, through the improvement of the operational method and equipment, and the operational experience. Also, the verification of the operational ability, maintainability, reliability and safety of this new type reactor, that is the mission of the prototype reactor, achieved steadily the good results. Hereafter, the verification of operational performance is the main objective because it is required for the design, construction and operation of the demonstration reactor. The organization for the operation management and operation, the communication at the time of the abnormality, the operation of the plant, that is, start up, stop and the operation at the rated output, the works during plant stoppage, the operation at the time of the plant abnormality, the operation of waste treatment facility and others, the improvement of the operational method, and the education and training of operators are reported. (Kako, I.)

  17. Operation of the OSIRIS reactor from the viewpoint of analysis of operator functions

    International Nuclear Information System (INIS)

    Fichet-Clairfontaine, P.Y.; Saint-Jean, T.

    1985-09-01

    This paper presents the results of analyses carried out on site by the Human Factor Study Laboratory in an experimental nuclear plant operated by the Atomic Energy Commissariat - the OSIRIS pool reactor. The analyses of certain tasks are given: work in the reactor hall and an operation of circuit setting performed by the mechanics. This work has thrown light on certain operational guidelines implemented by the operators when carrying out their work [fr

  18. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  19. Operator reliability study for Probabilistic Safety Analysis of an operating research reactor

    International Nuclear Information System (INIS)

    Mohamed, F.; Hassan, A.; Yahaya, R.; Rahman, I.; Maskin, M.; Praktom, P.; Charlie, F.

    2015-01-01

    Highlights: • Human Reliability Analysis (HRA) for Level 1 Probabilistic Safety Analysis (PSA) is performed on research nuclear reactor. • Implemented qualitative HRA framework is addressed. • Human Failure Events of significant impact to the reactor safety are derived. - Abstract: A Level 1 Probabilistic Safety Analysis (PSA) for the TRIGA Mark II research reactor of Malaysian Nuclear Agency has been developed to evaluate the potential risk in its operation. In conjunction to this PSA development, Human Reliability Analysis (HRA) is performed in order to determine human contribution to the risk. The aim of this study is to qualitatively analyze human actions (HAs) involved in the operation of this reactor according to the qualitative part of the HRA framework for PSA which is namely the identification, qualitative screening and modeling of HAs. By performing this framework, Human Failure Events (HFEs) of significant impact to the reactor safety are systematically analyzed and incorporated into the PSA structure. A part of the findings in this study will become the input for the subsequent quantitative part of the HRA framework, i.e. the Human Error Probability (HEP) quantification

  20. Fort St. Vrain reactor performance and operation to full power

    International Nuclear Information System (INIS)

    Simon, W.A.; Bramblett, G.C.

    1982-01-01

    The Fort St. Vrain Nuclear Generating Station, powered by a high-temperature gas-cooled reactor (HTGR), has now been tested to full thermal power. Testing was conducted for the dual purposes of demonstrating component and system capability as a part of the rise-to-power program and determining core fluctuation/redistribution behavior under full power conditions. Both objectives were met. Full power performance of all major components and the achievement of nearly all design objectives has been verified. In addition, the tests showed that the fluctuation phenomenon has been corrected. Core region outlet temperature redistributions have been characterized, related to a physical mechanism, and shown to be inconsequential for overall plant operation

  1. Regulations for RA reactor operation; Propisi nuklearnog reaktora 'RA'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-09-15

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions. [Serbo-Croat] Propisi o radu nuklearnog reaktora RA pisani su tako da svi zakonski propisi definisani 'Zakonom o zastiti od jonizujuceg zracenja' i pratecim propisima (devet pravilnika) kao i tehnicke norme prema preporukama MAAE budu postovani u punoj meri pri radu reaktora. Sadrzaj ove knjige obuhvata: osnovne podatke o reaktoru; zakonske propise; organizaciju rada reaktora RA; opste propise o rezimu rada, kretanju u zgradi reaktora, izvodjenju eksperimenata; pogonske propise za rad u normalnom rezimu i u slucaju udesa.

  2. Operational safety and reactor life improvements of Kyoto University Reactor

    International Nuclear Information System (INIS)

    Utsuro, M.; Fujita, Y.; Nishihara, H.

    1990-01-01

    Recent important experience in improving the operational safety and life of a reactor are described. The Kyoto University Reactor (KUR) is a 25-year-old 5 MW light water reactor provided with two thermal columns of graphite and heavy water as well as other kinds of experimental facilities. In the graphite thermal column, noticeable amounts of neutron irradiation effects had accumulated in the graphite blocks near the core. Before the possible release of the stored energy, all the graphite blocks in the column were successfully replaced with new blocks using the opportunity provided by the installation of a liquid deuterium cold neutron source in the column. At the same time, special seal mechanisms were provided for essential improvements to the problem of radioactive argon production in the column. In the heavy-water thermal column we have accomplished the successful repair of a slow leak of heavy water through a thin instrumentation tube failure. The repair work included the removal and reconstructions of the lead and graphite shielding layers and welding of the instrumentation tube under radiation fields. Several mechanical components in the reactor cooling system were also exchanged for new components with improved designs and materials. On-line data logging of almost all instrumentation signals is continuously performed with a high speed data analysis system to diagnose operational conditions of the reactor. Furthermore, through detailed investigations on critical components, operational safety during further extended reactor life will be supported by well scheduled maintenance programs

  3. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  4. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  5. LBB application in the US operating and advanced reactors

    Energy Technology Data Exchange (ETDEWEB)

    Wichman, K.; Tsao, J.; Mayfield, M.

    1997-04-01

    The regulatory application of leak before break (LBB) for operating and advanced reactors in the U.S. is described. The U.S. Nuclear Regulatory Commission (NRC) has approved the application of LBB for six piping systems in operating reactors: reactor coolant system primary loop piping, pressurizer surge, safety injection accumulator, residual heat removal, safety injection, and reactor coolant loop bypass. The LBB concept has also been applied in the design of advanced light water reactors. LBB applications, and regulatory considerations, for pressurized water reactors and advanced light water reactors are summarized in this paper. Technology development for LBB performed by the NRC and the International Piping Integrity Research Group is also briefly summarized.

  6. Study on Reactor Performance of Online Power Monitoring in PUSPATI TRIGA Reactor (RTP)

    International Nuclear Information System (INIS)

    Zareen Khan Abdul Jalil Khan; Ridzuan Abdul Mutalib; Mohd Sabri Minhat

    2014-01-01

    The Reactor TRIGA PUSPATI (RTP) at Malaysia Nuclear Agency is a TRIGA Mark II type reactor and pool type cooled by natural circulation of light water. This paper describe on reactor performance of online power monitoring based on various parameter of reactor such as log power, linear power, period, Fuel and coolant temperature and reactivity parameter with using neutronic and other instrumentation system of reactor. Methodology of online power estimation and monitoring is to evaluate and analysis of reactor power which is important of reactor safety and control. Neutronic instrumentation system will use to estimate power measurement, differential of log and linear power and period during reactor operation .This study also focus on noise fluctuation from fission chamber during reactor operation .This work will present result of online power monitoring from RTP which indicated the safety parameter identification and initiate safety action on crossing the threshold set point trip. Conclude that optimization of online power monitoring will improved the reactor control and safety parameter of reactor during operation. (author)

  7. Method of operating FBR type reactors

    International Nuclear Information System (INIS)

    Arie, Kazuo.

    1984-01-01

    Purpose: To secure the controlling performance and the safety of FBR type reactors by decreasing the amount of deformation due to the difference in the heat expansion of a control rod guide tube. Method: The reactor is operated while disposing reactor core fuel assemblies of a same power at point-to-point symmetrical positions relative to the axial center for the control rod assembly. This can eliminate the temperature difference between opposing surfaces of the control rod guide tube and eliminate the difference in the thermal expansion. (Yoshino, Y.)

  8. Method of operating BWR type reactors

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1980-01-01

    Purpose: To enable reactor control depending on any demanded loads by performing control by the insertion of control rods in addition to the control by the regulation of the flow rate of the reactor core water at high power operation of a BWR type reactor. Method: The power is reduced at high power operation by decreasing the flow rate of reactor core water from the starting time for the power reduction and the flow rate is maintained after the time at which it reaches the minimum allowable flow rate. Then, the control rod is started to insert from the above time point to reduce the power to an aimed level. Thus, the insufficiency in the reactivity due to the increase in the xenon concentration can be compensated by the withdrawal of the control rods and the excess reactivity due to the decrease in the xenon concentration can be compensated by the insertion of the control rods, whereby the reactor power can be controlled depending on any demanded loads without deviating from the upper or lower limit for the flow rate of the reactor core water. (Moriyama, K.)

  9. Operational and reliability experience with reactor instrumentation

    International Nuclear Information System (INIS)

    Dixon, F.; Gow, R.S.

    1978-01-01

    In the last 15 years the CEGB has experienced progressive plant development, integration and changes in operating regime through nine nuclear (gas-cooled reactor) power stations with corresponding instrumentation advances leading towards more refined centralized control. Operation and reliability experience with reactor instrumentation is reported in this paper with reference to the progressive changes related to the early magnox, late magnox and AGR periods. Data on instrumentation reliability in terms of reactor forced outages are presented and show that the instrumentation contributions to loss of generating plant availability are small. Reactor safety circuits, neutron flux and temperature measurements, gas analysis and vibration monitoring are discussed. In reviewing the reactor instrumentation the emphasis is on reporting recent experience, particularly on AGR equipment, but overall performance and changes to magnox equipment are included so that some appreciation can be obtained of instrumentation requirements with respect to plant lifetimes. (author)

  10. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  12. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  13. Power reactors operational diagnosis

    International Nuclear Information System (INIS)

    Dach, K.; Pecinka, L.

    1976-01-01

    The definition of reactor operational diagnostics is presented and the fundamental trends of research are determined. The possible sources of power reactor malfunctions, the methods of defect detection, the data evaluation and the analysis of the results are discussed in detail. In view of scarcity of a theoretical basis and of insufficient in-core instrumentation, operational diagnostics cannot be as yet incorporated in a computer-aided reactor control system. (author)

  14. Operation and maintenance of the RB reactor, Annual report for 1978

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1978-01-01

    The annual report for 1978 includes the following: utilization of the RB reactor; producing the new safety report; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Four annexes to this report are concerned with: operation of the reactor at higher power levels; performance of the instrumentation, radiation doses during operation; gamma radiation doses after reactor shutdown; properties of the neutron converter (optimization of the rector-converter coupling; maintenance of the reactor equipment; purchase of new equipment

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  16. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  18. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  19. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  20. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  1. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  2. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  3. TOKOPS: Tokamak Reactor Operations Study: The influence of reactor operations on the design and performance of tokamaks with solid-breeder blankets: Final report

    International Nuclear Information System (INIS)

    Conn, R.W.; Ghoniem, N.M.; Firestone, M.A.

    1986-09-01

    Reactor system operation and procedures have a profound impact on the conception and design of power plants. These issues are studied here using a model tokamak system employing a solid-breeder blanket. The model blanket is one which has evolved from the STARFIRE and BCSS studies. The reactor parameters are similar to those characterizing near-term fusion engineering reactors such as INTOR or NET (Next European Tokamak). Plasma startup, burn analysis, and methods for operation at various levels of output power are studied. A critical, and complicating, element is found to be the self-consistent electromagnetic response of the system, including the presence of the blanket and the resulting forces and loadings. Fractional power operation, and the strategy for burn control, is found to vary depending on the scaling law for energy confinement, and an extensive study is reported. Full-power reactor operation is at a neutron wall loading pf 5 MW/m 2 and a surface heat flux of 1 MW/m 2 . The blanket is a pressurized steel module with bare beryllium rods and low-activation HT-9-(9-C-) clad LiAlO 2 rods. The helium coolant pressure is 5 MPa, entering the module at 297 0 C and exiting at 550 0 C. The system power output is rated at 1000 MW(e). In this report, we present our findings on various operational scenarios and their impact on system design. We first start with the salient aspects of operational physics. Time-dependent analyses of the blanket and balance of plant are then presented. Separate abstracts are included for each chapter

  4. Recent U.S. reactor operating experience

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1977-01-01

    A qualitative assessment of U.S. and foreign reactor operating experience is provided. Recent operating occurrences having potentially significant safety impacts on power operation are described. An evaluation of the seriousness of each of these issues and the plans for resolution is discussed. A quantitative report on U.S. reactor operational experience is included. The details of the NRC program for evaluating and applying operating reactor experience in the regulatory process is discussed. A review is made of the adequacy of operating reactor safety and environmental margins based on actual operating experience. The Regulatory response philosophy to operating reactor experiences is detailed. This discussion indicates the NRC emphasis on the importance of a balanced action plan to provide for the protection of public safety in the national interest

  5. Linguistic Formalism for Semi-Autonomous Reactor Operation

    International Nuclear Information System (INIS)

    Joo, Sungmoon; Seo, Sang Mun; Suh, Yong-Suk; Park, Cheol

    2017-01-01

    The ultimate goal of our work is to develop a novel, integrated system for semi-autonomous reactor operation by introducing an interfacing language shared by human reactor operators and artificially intelligent service agents (e.g., robots). We envision that human operators and artificially intelligent service agents operate the reactor cooperatively in the future. For example, an artificially intelligent service agent carries out a human reactor operator's command or reports the result of a task commanded by the human reactor operator. This work presents preliminary work towards a unified linguistic formalism for cooperative, semiautonomous reactor operation. Application of the proposed formalism to reactor operator communication domain shows that the formalism effectively captures the syntax and semantics of the domain-specific language defined by the communication protocol.

  6. Regulations and instructions for RB reactor operation; Propisi i uputstva za rad reaktora RB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-07-01

    This document includes regulations for reactor RB operation, behaviour and presence of staff in the reactor building; regulations for performing experiments at the RB reactor, regulations and int ructions for the reactor operators and other staff on duty. A chapter is devoted to instruction for reactor operation with the operating documentation and special duties of the operators. Regulations and instruction concerned with accidents are described with classification of accidents and evacuation plan. Annexes to this document include: the present status of the reactor; program for training the reactor operators; forms which are obligatory to be signed for any operating activity, and the certificate of the RB reactor lattice.

  7. Reactor core operation management system

    International Nuclear Information System (INIS)

    Sato, Tomomi.

    1992-01-01

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.)

  8. Reactor core operation management system

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Tomomi.

    1992-05-28

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.).

  9. Good practices in heavy water reactor operation

    International Nuclear Information System (INIS)

    2010-06-01

    The value and importance of organizations in the nuclear industry engaged in the collection and analysis of operating experience and best practices has been clearly identified in various IAEA publications and exercises. Both facility safety and operational efficiency can benefit from such information sharing. Such sharing also benefits organizations engaged in the development of new nuclear power plants, as it provides information to assist in optimizing designs to deliver improved safety and power generation performance. In cooperation with Atomic Energy of Canada, Ltd, the IAEA organized the workshop on best practices in Heavy Water Reactor Operation in Toronto, Canada from 16 to 19 September 2008, to assist interested Member States in sharing best practices and to provide a forum for the exchange of information among participating nuclear professionals. This workshop was organized under Technical Cooperation Project INT/4/141, on Status and Prospects of Development for and Applications of Innovative Reactor Concepts for Developing Countries. The workshop participants were experts actively engaged in various aspects of heavy water reactor operation. Participants presented information on activities and practices deemed by them to be best practices in a particular area for consideration by the workshop participants. Presentations by the participants covered a broad range of operational practices, including regulatory aspects, the reduction of occupational dose, performance improvements, and reducing operating and maintenance costs. This publication summarizes the material presented at the workshop, and includes session summaries prepared by the chair of each session and papers submitted by the presenters

  10. Performance Monitoring for Nuclear Safety Related Instrumentation at PUSPATI TRIGA Reactor (RTP)

    International Nuclear Information System (INIS)

    Zareen Khan Abdul Jalil Khan; Ridzuan Abdul Mutalib; Mohd Sabri Minhat

    2015-01-01

    The Reactor TRIGA PUSPATI (RTP) at Malaysia Nuclear Agency is a TRIGA Mark II type reactor and pool type cooled by natural circulation of light water. This paper describe on performance monitoring for nuclear safety related instrumentation in TRIGA PUSPATI Reactor (RTP) of based on various parameter of reactor safety instrument channel such as log power, linear power, Fuel temperature, coolant temperature will take into consideration. Methodology of performance on estimation and monitoring is to evaluate and analysis of reactor parameters which is important of reactor safety and control. And also to estimate power measurement, differential of log and linear power and fuel temperature during reactor start-up, operation and shutdown .This study also focus on neutron power fluctuation from fission chamber during reactor start-up and operation. This work will present result of performance monitoring from RTP which indicated the safety parameter identification and initiate safety action on crossing the threshold set point trip. Conclude that performance of nuclear safety related instrumentation will improved the reactor control and safety parameter during reactor start-up, operation and shutdown. (author)

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  12. BEACON TSM application system to the operation of PWR reactors

    International Nuclear Information System (INIS)

    Lozano, J. A.; Mildrum, C.; Serrano, J. F.

    2012-01-01

    BEACON-TSM is an advanced core monitoring system for PWR reactor cores, and also offers the possibility to perform a wide range of predictive calculation in support of reactor operation. BEACON-TSM is presently installed and licensed in the 5 Spanish PWR reactors of standard Westinghouse design. the purpose of this paper is to describe the features of this software system and to show the advantages obtainable by a nuclear power plant from its use. To illustrate the capabilities and benefits of BEACON-TSM two real case reactor operating situations are presented. (Author)

  13. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  14. Reactor operation safety information document

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  15. Operating US power reactors

    International Nuclear Information System (INIS)

    Silver, E.G.

    1988-01-01

    This update, which appears regularly in each issue of Nuclear Safety, surveys the operations of those power reactors in the US which have been issued operating licenses. Table 1 shows the number of such reactors and their net capacities as of September 30, 1987, the end of the three-month period covered in this report. Table 2 lists the unit capacity and forced outage rate for each licensed reactor for each of the three months (July, August, and September 1987) covered in this report and the cumulative values of these parameters since the beginning of commercial operation. In addition to the tabular data, this article discusses other significant occurrences and developments that affected licensed US power reactors during this reporting period. Status changes at Braidwood Unit 1, Nine Mile Point 2, and Beaver Valley 2 are discussed. Other occurrences discussed are: retraining of control-room operators at Peach Bottom; a request for 25% power for Shoreham, problems at Fermi 2 which delayed the request to go to 75% power; the results of a safety study of the N Reactor at Hanford; a proposed merger of Pacific Gas and Electric with Sacramento Municipal Utility District which would result in the decommissioning of Rancho Seco; the ordered shutdown of Oyster Creek; a minor radioactivity release caused by a steam generator tube rupture at North Anna 1; and 13 fines levied by the NRC on reactor licensees

  16. Operation management of the prototype heavy water reactor 'Fugen'

    Energy Technology Data Exchange (ETDEWEB)

    Muramatsu, Akira; Takei, Hiroaki; Iwanaga, Shigeru; Noda, Masao; Hara, Hidemi (Power Reactor and Nuclear Fuel Development Corp., Tokyo (Japan))

    1983-09-01

    The advanced thermal reactor Fugen power station has continued almost smooth operation since it began the full scale operation as the first homemade power reactor in Japan in March, 1979. In the initial period of operation, some troubles were experienced, but now, it can be said that the operational techniques of heavy water-moderated, boiling light water-cooled, pressure tube type reactors have been established, through the improvement of the operational method and equipment, and the operational experience. Also, the verification of the operational ability, maintainability, reliability and safety of this new type reactor, that is the mission of the prototype reactor, achieved steadily the good results. Hereafter, the verification of operational performance is the main objective because it is required for the design, construction and operation of the demonstration reactor. The organization for the operation management and operation, the communication at the time of the abnormality, the operation of the plant, that is, start up, stop and the operation at the rated output, the works during plant stoppage, the operation at the time of the plant abnormality, the operation of waste treatment facility and others, the improvement of the operational method, and the education and training of operators are reported.

  17. Reactor science and technology: operation and control of reactors

    International Nuclear Information System (INIS)

    Qiu Junlong

    1994-01-01

    This article is a collection of short reports on reactor operation and research in China in 1991. The operation of and research activities linked with the Heavy Water Research Reactor, Swimming Pool Reactor and Miniature Neutron Source Reactor are briefly surveyed. A number of papers then follow on the developing strategies in Chinese fast breeder reactor technology including the conceptual design of an experimental fast reactor (FFR), theoretical studies of FFR thermo-hydraulics and a design for an immersed sodium flowmeter. Reactor physics studies cover a range of topics including several related to work on zero power reactors. The section on reactor safety analysis is concerned largely with the assessment of established, and the presentation of new, computer codes for use in PWR safety calculations. Experimental and theoretical studies of fuels and reactor materials for FBRs, PWRs, BWRs and fusion reactors are described. A final miscellaneous section covers Mo-Tc isotope production in the swimming pool reactor, convective heat transfer in tubes and diffusion of tritium through plastic/aluminium composite films and Li 2 SiO 3 . (UK)

  18. Nuclear safety requirements for operation licensing of Egyptian research reactors

    International Nuclear Information System (INIS)

    Ahmed, E.E.M.; Rahman, F.A.

    2000-01-01

    From the view of responsibility for health and nuclear safety, this work creates a framework for the application of nuclear regulatory rules to ensure safe operation for the sake of obtaining or maintaining operation licensing for nuclear research reactors. It has been performed according to the recommendations of the IAEA for research reactor safety regulations which clearly states that the scope of the application should include all research reactors being designed, constructed, commissioned, operated, modified or decommissioned. From that concept, the present work establishes a model structure and a computer logic program for a regulatory licensing system (RLS code). It applies both the regulatory inspection and enforcement regulatory rules on the different licensing process stages. The present established RLS code is then applied to the Egyptian Research Reactors, namely; the first ET-RR-1, which was constructed and still operating since 1961, and the second MPR research reactor (ET-RR-2) which is now in the preliminary operation stage. The results showed that for the ET-RR-1 reactor, all operational activities, including maintenance, in-service inspection, renewal, modification and experiments should meet the appropriate regulatory compliance action program. Also, the results showed that for the new MPR research reactor (ET-RR-2), all commissioning and operational stages should also meet the regulatory inspection and enforcement action program of the operational licensing safety requirements. (author)

  19. Cooling Performance of Natural Circulation for a Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Park, Suki; Chun, J. H.; Yum, S. B. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    This paper deals with the core cooling performance by natural circulation during normal operation and a flow channel blockage event in an open tank-in-pool type research reactor. The cooling performance is predicted by using the RELAP5/ MOD3.3 code. The core decay heat is usually removed by natural circulation to the reactor pool water in open tank-in-pool type research reactors with the thermal power less than several megawatts. Therefore, these reactors have generally no active core cooling system against a loss of normal forced flow. In reactors with the thermal power less than around one megawatt, the reactor core can be cooled down by natural circulation even during normal full power operation. The cooling performance of natural circulation in an open tank-in-pool type research reactor has been investigated during the normal natural circulation and a flow channel blockage event. It is found that the maximum powers without void generation at the hot channel are around 1.16 MW and 820 kW, respectively, for the normal natural circulation and the flow channel blockage event.

  20. Reactor modification, preparation and operation

    International Nuclear Information System (INIS)

    Weill, J.; Furet, J.; Baillet, J.; Donvez, G.; Duchene, J.; Gras, R.; Mercier, R.; Chenouard, J.; Leconte, J.

    1962-01-01

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system

  1. Reactor modification, preparation and operation

    Energy Technology Data Exchange (ETDEWEB)

    Weill, J; Furet, J; Baillet, J; Donvez, G; Duchene, J; Gras, R; Mercier, R [Electronics Dept., Independent Section of Reactor Electronics, Saclay (France); Chenouard, J; Leconte, J [Dept. of Physical Chemistry, Stable Isotopes Section, Saclay (France)

    1962-03-01

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system.

  2. Reactor modification, preparation and operation

    Energy Technology Data Exchange (ETDEWEB)

    Weill, J; Furet, J; Baillet, J; Donvez, G; Duchene, J; Gras, R; Mercier, R [Electronics Dept., Independent Section of Reactor Electronics, Saclay (France); Chenouard, J; Leconte, J [Dept. of Physical Chemistry, Stable Isotopes Section, Saclay (France)

    1962-03-15

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system.

  3. Reactor operations at SAFARI-1

    International Nuclear Information System (INIS)

    Vlok, J.W.H.

    2003-01-01

    A vigorous commercial programme of isotope production and other radiation services has been followed by the SAFARI-1 research reactor over the past ten years - superimposed on the original purpose of the reactor to provide a basic tool for nuclear research, development and education to the country at an institutional level. A combination of the binding nature of the resulting contractual obligations and tighter regulatory control has demanded an equally vigorous programme of upgrading, replacement and renovation of many systems in order to improve the safety and reliability of the reactor. Not least among these changes is the more effective training and deployment of operations personnel that has been necessitated as the operational demands on the reactor evolved from five days per week to twenty four hours per day, seven days per week, with more than 300 days per year at full power. This paper briefly sketches the operational history of SAFARI-1 and then focuses on the training and structuring currently in place to meet the operational needs. There is a detailed step-by-step look at the operator?s career plan and pre-defined milestones. Shift work, especially the shift cycle, has a negative influence on the operator's career path development, especially due to his unavailability for training. Methods utilised to minimise this influence are presented. The increase of responsibilities regarding the operation of the reactor, ancillaries and experimental facilities as the operator progresses with his career are discussed. (author)

  4. Operation of the High Flux Reactor. Annual report 1985

    International Nuclear Information System (INIS)

    1985-01-01

    This year was characterized by the end of a major rebuilding of the installation during which the reactor vessel and its peripheral components were replaced by new and redesigned equipment. Both operational safety and experimental use were largely improved by the replacement. The reactor went back to routine operation on February 14, 1985, and has been operating without problem since then. All performance parameters were met. Other upgrading actions started during the year concerned new heat exchangers and improvements to the reactor building complex. The experimental load of the High Flux Reactor reached a satisfactory level with an average of 57%. New developments aimed at future safety related irradiation tests and at novel applications of neutrons from the horizontal beam tubes. A unique remote encapsulation hot cell facility became available adding new possibilities for fast breeder fuel testing and for intermediate specimen examination. The HFR Programme hosted an international meeting on development and use of reduced enrichment fuel for research reactors. All aspects of core physics, manufacture technology, and licensing of novel, proliferation-free, research reactor fuel were debated

  5. Monitoring device for reactor operation

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1980-01-01

    Purpose: To increase the freedom for the power control due to control rod operation and flow rate control, as well as prevent fuel failures by the provision of a power distribution forecasting device for forecasting the changes in the reactor core power distribution and a device for calculating the fuel performance index and judging to display the calculated values. Constitution: The results for the calculation of the reactor core power distribution from a process computer that processes each of measuring signals of a nuclear power plant are used as inputs to a fuel power history calculator to constitute the power history up to the present time for each of the fuels. The date are inputted to a fuel performance index calculator to calculate the fuel performance index at present time for each of the fuels. Changes in the power distribution are forecast in a forecasting device for reactor power distribution relative to the changes in the control variables of a control variable memory unit and the date are inputted to a fuel power history calculator to forecast the power changes for each of the fuels. The amount of the power changes is inputted to a fuel performance index calculator and a fuel performance indicating and judging device judges and displays if they exceed a predetermined value. (Seki, T.)

  6. Research and development into power reactor fuel performance

    International Nuclear Information System (INIS)

    Notley, M.J.F.

    1983-07-01

    The nuclear fuel in a power reactor must perform reliably during normal operation, and the consequences of abnormal events must be researched and assessed. The present highly reliable operation of the natural UO 2 in the CANDU power reactors has reduced the need for further work in this area; however a core of expertise must be retained for purposes such as training of new staff, retaining the capability of reacting to unforeseen circumstances, and participating in the commercial development of new ideas. The assessment of fuel performance during accidents requires research into many aspects of materials, fuel and fission product behaviour, and the consolidation of that knowledge into computer codes used to evaluate the consequences of any particular accident. This work is growing in scope, much is known from out-reactor work at temperatures up to about 1500 degreesC, but the need for in-reactor verification and investigation of higher-temperature accidents has necessitated the construction of a major new in-reactor test loop and the initiation of the associated out-reactor support programs. Since many of the programs on normal and accident-related performance are generic in nature, they will be applicable to advanced fuel cycles. Work will therefore be gradually transferred from the present, committed power reactor system to support the next generation of thorium-based reactor cycles

  7. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1992-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. For continuous training of the existing operator staff the Service has prepared and published eleven booklets: Nuclear reactor; RA reactor primary coolant loop; System for purification of heavy water; reactor helium system; system for technical water; electric power system; control and operation; ventilation system in the reactor building; special sewage system; construction properties of the reactor core; reactor building and installations. During the reporting period there have been no accidents nor incidents that could affect the reactor personnel [sr

  8. Operational limits and conditions and operating procedures for research reactors. Safety guide

    International Nuclear Information System (INIS)

    2008-01-01

    This publication provides practical guidance on all important aspects of developing, formulating and presenting the operational limits and conditions as well as the operating procedures for research reactors. It covers the concept of operational limits and conditions, their content, and the responsibilities of the operating organization with respect to their establishment, modification, documentation and compliance. The guidance also covers the training of operating personnel on performing periodic testing, established by the operational limits and conditions, and operating procedures

  9. Course of operators of the RA-3 reactor

    International Nuclear Information System (INIS)

    Caligiuri, G.A.

    1983-01-01

    Description of the fundamental principles of the nuclear reactors' control systems. The RA-3 reactor's control and measurement systems are principally described, without setting aside the basic criteria for the design of an appropriate instrumentation for the control of a nuclear reactor, as well as the theory on which the functioning of the several detectors and equipments used in a nuclear instrumentation are based. The main purpose of this course is that of serving, preferentially as a text, for the training of personnel which shall perform operation tasks in this reactor. The work includes three well-defined sections. The first two ones make an introduction to the subject, while the third one, extending to more than half-work, deals with the general description of the system in which the control and operation logic of RA-3 are included. (R.J.S) [es

  10. Plutonium Recycle Test Reactor (PRTR). Operating Experience and Supporting R and D, Its Application to Heavy-Water Power Reactor Design and Operation

    Energy Technology Data Exchange (ETDEWEB)

    Harty, H. [Battelle Memorial Institute, Pacific Northwest Laboratories, Richland, WA (United States)

    1968-04-15

    Convincing answers to questions about heavy-water, pressure-tube, power reactors, e.g. pressure-tube serviceability, heavy-water management problems, long-term behaviour of special pressure-tube reactor components, and unique operating maintenance problems (compared to light-water reactors) must be based on actual operating experience with that type of reactor. PRTR operating experience and supporting R and D studies, although not always simple extrapolations to power reactors, can be summarized in a context applicable to future heavy-water power reactors, as follows: 1. Pressure-tube life, in a practical case, need not be limited by creep, gross hydriding, corrosion, or mechanical damage. The possibility that growth of a defect (perhaps service-induced) to a size that is critical under certain operating conditions, remains a primary unknown in pressure- tube life extrapolations. A pressure-tube failure in PRTR (combined with gross release of fuel material) proved only slightly more inconvenient, time consuming, and damaging to the reactor proper, than occurred with a gross failure of a fuel element in PRTR. 2. Routine operating losses of heavy water appear tractable in heavy-water-cooled power reactors; losses from low-pressure systems can be insignificant over the life of a plant. Non-routine losses may prove to be the largest component of loss over the life of a plant. 3. The performance of special components in PRTR, e.g. the calandria and shields, has not deteriorated despite being subjected to non-standard operating conditions. The calandria now contains a light-water reflector with single barrier separation from the heavy-water moderator. The carbon steel shields (containing carbon steel shot) show no deterioration based on pressure drop measurements and piping activation immediately outside the shields. The helium pressurization system (for primary coolant pressurization) remains a high maintenance system, and cannot be recommended for power reactors, based

  11. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Haselow, J.S.; Price, V.; Stephenson, D.E.; Bledsoe, H.W.; Looney, B.B.

    1989-12-01

    The Savannah River Site (SRS) produces nuclear materials, primarily plutonium and tritium, to meet the requirements of the Department of Defense. These products have been formed in nuclear reactors that were built during 1950--1955 at the SRS. K, L, and P reactors are three of five reactors that have been used in the past to produce the nuclear materials. All three of these reactors discontinued operation in 1988. Currently, intense efforts are being extended to prepare these three reactors for restart in a manner that protects human health and the environment. To document that restarting the reactors will have minimal impacts to human health and the environment, a three-volume Reactor Operations Environmental Impact Document has been prepared. The document focuses on the impacts of restarting the K, L, and P reactors on both the SRS and surrounding areas. This volume discusses the geology, seismology, and subsurface hydrology. 195 refs., 101 figs., 16 tabs.

  12. Safety operation of training reactor VR-1

    International Nuclear Information System (INIS)

    Matejka, K.

    2001-01-01

    There are three nuclear research reactors in the Czech Republic in operation now: light water reactor LVR-15, maximum reactor power 10 MW t , owner and operator Nuclear Research Institute Rez; light water zero power reactor LR-0, maximum reactor power 5 kW t , owner and operator Nuclear Research Institute Rez and training reactor VR-1 Sparrow, maximum reactor power 5 kW t , owner and operate Faculty of Nuclear Sciences and Physical Engineering, CTU in Prague. The training reactor VR-1 Vrabec 'Sparrow', operated at the Faculty of Nuclear Sciences and Physical Engineering, Czech Technical University in Prague, was started up on December 3, 1990. Particularly it is designed for training the students of Czech universities, preparing the experts for the Czech nuclear programme, as well as for certain research work, and for information programmes in the nuclear programme, as well as for certain research work, and for information programmes in sphere of using the nuclear energy (public relations). (author)

  13. Operational experience with Dragon reactor experiment of relevance to commercial reactors

    International Nuclear Information System (INIS)

    Capp, P.D.; Simon, R.A.

    1976-01-01

    An important part of the experience gained during the first ten years of successful power operation of the Dragon Reactor is relevant to the design and operation of future High Temperature Reactors (HTRs). The aspects presented in this paper have been chosen as being particularly applicable to larger HTR systems. Core performance under a variety of conditions is surveyed with particular emphasis on a technique developed for the identification and location of unpurged releasing fuel and the presence of activation and fission products in the core area. The lessons learned during the reflector block replacement are presented. Operating experience with the primary circuit identifies the lack of mixing of gas streams within the hot plenum and the problems of gas streaming in ducts. Helium leakage from the circuit is often greater than the optimum 0.1%/d. Virtually all the leakage problems are associated with the small bore instrument pipework essential for the many experiments associated with the Dragon Reactor Experiment (DRE). Primary circuit maintenance work confirms the generally clean state of the DRE circuit but identifies 137 Cs and 110 Agsup(m) as possible hazards if fuel emitting these isotopes is irradiated. (author)

  14. Operation of CANDU power reactor in thorium self-sufficient fuel cycle

    Indian Academy of Sciences (India)

    This paper presents the results of calculations for CANDU reactor operation in thorium fuel cycle. Calculations are performed to estimate the feasibility of operation of heavy-water thermal neutron power reactor in self-sufficient thorium cycle. Parameters of active core and scheme of fuel reloading were considered to be the ...

  15. Reactor operations Brookhaven medical research reactor, Brookhaven high flux beam reactor informal monthly report

    International Nuclear Information System (INIS)

    Hauptman, H.M.; Petro, J.N.; Jacobi, O.

    1995-04-01

    This document is the April 1995 summary report on reactor operations at the Brookhaven Medical Research Reactor and the Brookhaven High Flux Beam Reactor. Ongoing experiments/irradiations in each are listed, and other significant operations functions are also noted. The HFBR surveillance testing schedule is also listed

  16. Reactor shutdown: nuclear power plant performance

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The article essentially looks at the performance of nine of Sweden's nuclear reactors. A table lists the percentage of time for the first three quarters of 1981 that the reactors were operating, and the number of hours out of service for planned or other reasons. In particular, one station - Ringhals 3 - was out of action because of a damaged tube in the associated steam generator. The same fault occurred with another reactor - Ringhals 4 - before this was brought into service. The reasons for the failure and its importance are briefly discussed. (G.P.)

  17. Fast reactor parameter optimization taking into account changes in fuel charge type during reactor operation time

    International Nuclear Information System (INIS)

    Afrin, B.A.; Rechnov, A.V.; Usynin, G.B.

    1987-01-01

    The formulation and solution of optimization problem for parameters determining the layout of the central part of sodium cooled power reactor taking into account possible changes in fuel charge type during reactor operation time are performed. The losses under change of fuel composition type for two reactor modifications providing for minimum doubling time for oxide and carbide fuels respectively, are estimated

  18. Research nuclear reactor operation management

    International Nuclear Information System (INIS)

    Preda, M.; Carabulea, A.

    2008-01-01

    Some aspects of reactor operation management are highlighted. The main mission of the operational staff at a testing reactor is to operate it safely and efficiently, to ensure proper conditions for different research programs implying the use of the reactor. For reaching this aim, there were settled down operating plans for every objective, and procedure and working instructions for staff training were established, both for the start-up and for the safe operation of the reactor. Damages during operation or special situations which can arise, at stop, start-up, maintenance procedures were thoroughly considered. While the technical skill is considered to be the most important quality of the staff, the organising capacity is a must in the operation of any nuclear facility. Staff training aims at gaining both theoretical and practical experience based on standards about staff quality at each work level. 'Plow' sheet has to be carefully done, setting clear the decision responsibility for each person so that everyone's own technical level to be coupled to the problems which implies his responsibility. Possible events which may arise in operation, e.g., criticality, irradiation, contamination, and which do not arise in other fields, have to be carefully studied. One stresses that the management based on technical and scientific arguments have to cover through technical, economical and nuclear safety requirements a series of interlinked subprograms. Every such subprograms is subject to some peculiar demands by the help of which the entire activity field is coordinated. Hence for any subprogram there are established the objectives to be achieved, the applicable regulations, well-defined responsibilities, training of the personnel involved, the material and documentation basis required and activity planning. The following up of positive or negative responses generated by experiments and the information synthesis close the management scope. Important management aspects

  19. A Preliminary Analysis of Reactor Performance Test (LOEP) for a Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyeonil; Park, Su-Ki [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    The final phase of commissioning is reactor performance test, which is to prove the integrated performance and safety of the research reactor at full power with fuel loaded such as neutron power calibration, Control Absorber Rod/Second Shutdown Rod drop time, InC function test, Criticality, Rod worth, Core heat removal with natural mechanism, and so forth. The last test will be safety-related one to assure the result of the safety analysis of the research reactor is marginal enough to be sure about the nuclear safety by showing the reactor satisfies the acceptance criteria of the safety functions such as for reactivity control, maintenance of auxiliaries, reactor pool water inventory control, core heat removal, and confinement isolation. After all, the fuel integrity will be ensured by verifying there is no meaningful change in the radiation levels. To confirm the performance of safety equipment, loss of normal electric power (LOEP), possibly categorized as Anticipated Operational Occurrence (AOO), is selected as a key experiment to figure out how safe the research reactor is before turning over the research reactor to the owner. This paper presents a preliminary analysis of the reactor performance test (LOEP) for a research reactor. The results showed how different the transient between conservative estimate and best estimate will look. Preliminary analyses have shown all probable thermal-hydraulic transient behavior of importance as to opening of flap valve, minimum critical heat flux ratio, the change of flow direction, and important values of thermal-hydraulic parameters.

  20. Operational power reactor health physics

    International Nuclear Information System (INIS)

    Watson, B.A.

    1987-01-01

    Operational Health Physics can be comprised of a multitude of organizations, both corporate and at the plant sites. The following discussion centers around Baltimore Gas and Electric's (BG and E) Calvert Cliffs Nuclear Power Plant, located in Lusby, Maryland. Calvert Cliffs is a twin Combustion Engineering 825 MWe pressurized water reactor site with Unit I having a General electric turbine-generator and Unit II having a Westinghouse turbine-generator. Having just completed each Unit's ten-year Inservice Inspection and Refueling Outge, a total of 20 reactor years operating health physics experience have been accumulated at Calvert Cliffs. Because BG and E has only one nuclear site most health physics functions are performed at the plant site. This is also true for the other BG and E nuclear related organizations, such as Engineering and Quality Assurance. Utilities with multiple plant sites have corporate health physics entity usually providing oversight to the various plant programs

  1. Method of operating a nuclear reactor

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Schaefer, W.F.

    1978-01-01

    A method of controlling a nuclear power generting station in the event of a malfunction of particular operating components is described. Upon identification of a malfunction, preselected groups of control rods are fully inserted sequentially until a predetermined power level is approached. Additional control rods are then selectively inserted to quickly bring the reactor to a second given power level to be compatible with safe operation of the system with the malfunctioning component. At the time the thermal power output of the reactor is being reduced, the turbine is operated at a rate consistent with the output of the reactor. In the event of a malfunction, the power generating system is operated in a turbine following reactor mode, with the reactor power rapidly reduced, in a controlled manner, to a safe level compatible with the type of malfunction experienced

  2. Graphics and control for in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1996-01-01

    Remotely operated inspection, repair and maintenance tasks for Magnox Electric's eight twin MAGNOX-type reactor stations must conform to the Nuclear Installations Inspectorate's regulations. The performance of manipulator systems used to undertake such operations has improved significantly with the recent introduction of computer graphics. These are used for simulation and demonstration purposes as well as a real-time aid to the manipulator operator. Outage times can be reduced by the appropriate use of such computer technology to reduce manipulator operation times. (UK)

  3. Impact of proposed research reactor standards on reactor operation

    Energy Technology Data Exchange (ETDEWEB)

    Ringle, J C; Johnson, A G; Anderson, T V [Oregon State University (United States)

    1974-07-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  4. Impact of proposed research reactor standards on reactor operation

    International Nuclear Information System (INIS)

    Ringle, J.C.; Johnson, A.G.; Anderson, T.V.

    1974-01-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  5. Analysis of the radiometric survey during the Argonauta reactor operation

    International Nuclear Information System (INIS)

    Oliveira, Eara de S.L.; Cardozo, Katia K.M.; Silva, Joao Carlos P.; Santos, Joao Regis dos

    2013-01-01

    The Argonaut reactor at the Institute of Nuclear Engineering-IEN/CNEN, operates normally, the powers between 1.7 and 340 W on neutrongraphy procedures, production of radionuclides and experimental reactor physics lessons to postgraduate courses. The doses from neutrons and gamma radiation are measured when the reactor is critical, inside the reactor hall and surrounding regions. A study of the data obtained was performed to evaluate the daily need of this survey in the reactor hall. Taking into account the principle ALARA, which aims to optimize and minimize the dose received by the individual, we propose, in this work, through an analysis of the acquired data in occupational radiometric surveys, a reformulation of the area monitoring routine practiced by the team of radiological protection of the Institute of Nuclear Engineering - IEN/CNEN-RJ, whereas other monitoring routines regarding the radiological protection are also applied in the routine of the reactor. The operations under review occurred with the reactor operating 340 W power at intervals of 60, 120 and 180 minutes, in monitoring points in controlled areas, supervised and free. The results showed significant dose values in the output of the J-Channel 9 when the operation occurs with this open. With 180 minutes of operation, the measured values of dose rate were lower than the values at 60 min and 120 operations min. At the point in the supervised area, offsite to the reactor hall, situated in the direction of the J-Channel 9, the value reduces more than 14% in any operating time in relation to the dose rate measured at the point opposite the canal. There is a 50% reduction in the dose rates for operations with and J-9 closed. The results suggest a new frequency of radiometric survey whose mode of operation is maintained in similar conditions, since combined with other relevant practices of radiation protection

  6. Contour analysis of steady state tokamak reactor performance

    International Nuclear Information System (INIS)

    Devoto, R.S.; Fenstermacher, M.E.

    1990-01-01

    A new method of analysis for presenting the possible operating space for steady state, non-ignited tokamak reactors is proposed. The method uses contours of reactor performance and plasma characteristics, fusion power gain, wall neutron flux, current drive power, etc., plotted on a two-dimensional grid, the axes of which are the plasma current I p and the normalized beta, β n = β/(I p /aB 0 ), to show possible operating points. These steady state operating contour plots are called SOPCONS. This technique is illustrated in an application to a design for the International Thermonuclear Experimental Reactor (ITER) with neutral beam, lower hybrid and bootstrap current drive. The utility of the SOPCON plots for pointing out some of the non-intuitive considerations in steady state reactor design is shown. (author). Letter-to-the-editor. 16 refs, 3 figs, 1 tab

  7. Method of safely operating nuclear reactor

    International Nuclear Information System (INIS)

    Ochiai, Kanehiro.

    1976-01-01

    Purpose: To provide a method of safely operating an nuclear reactor, comprising supporting a load applied to a reactor container partly with secondary container facilities thereby reducing the load borne by the reactor container when water is injected into the core to submerge the core in an emergency. Method: In a reactor emergency, water is injected into the reactor core thereby to submerge the core. Further, water is injected into a gap between the reactor container and the secondary container facilities. By the injection of water into the gap between the reactor container and the secondary container facilities a large apparent mass is applied to the reactor container, as a result of which the reactor container undergoes the same vibration as that of the secondary container facilities. Therefore, the load borne by the reactor container itself is reduced and stress at the bottom part of the reactor container is released. This permits the reactor to be operated more safely. (Moriyama, K.)

  8. Regulations and instructions for RA reactor operation

    International Nuclear Information System (INIS)

    1989-01-01

    This regulatory guide consists of following 4 chapters: Description of the RA reactor, organization scheme, regulations for performing experiments; Regulations for staff on duty; Instructions for operating the vacuum systems, heavy water and helium systems; and evacuation in case of accident [sr

  9. Nuclear fuel performance in boiling water reactors

    International Nuclear Information System (INIS)

    Elkins, R.B.; Baily, W.E.; Proebstle, R.A.; Armijo, J.S.; Klepfer, H.H.

    1981-01-01

    A major development program is described to improve the performance of Boiling Water Reactor fuel. This sustained program is described in four parts: 1) performance monitoring, 2) fuel design changes, 3) plant operating recommendations, and 4) advanced fuel programs

  10. Application of noise analysis on the operation of the RSG-GAS reactor

    International Nuclear Information System (INIS)

    Surian P, Tukiran S

    1999-01-01

    The RSG-GAS reactor has been operating for radioisotope production and experiments so that it is necessary to perform analysis of the reactor operation. analysis was done based on reactor noise experiment. Neutron noise at low and high power of the RSG-GAS has been analyzed using time and frequency domain with aim to determine the safety of reactor operation. The safety of reactor operation based on two parameters as, prompt neutron decay constant and decay ratio. The parameters are useful for reactor operation, so it is necessary to determine accurately. For determining prompt neutron decay constant, neutron density in the core of reactor which operated at 10 k W, was collected by using Fission Chamber detectors (FC). Based on power spectral density (PSD) was achieved break frequency about 23 Hz, so that the prompt neutron decay constant is about 151 sec -1 . While at at high power 20 MW, neutron density was collected by using Compensated Ionization Chamber (CIC) detector. The result at high power showed that there is reactivity effect in the core because of fluctuation in temperature and density of the coolant, and the decay ratio of 0.20, showed that the reactor is still operation in stable

  11. Outage performance improvement by state of the art reactor stud tensioning

    International Nuclear Information System (INIS)

    Oehler, Horst Werner; Vervliet, Herman

    2006-01-01

    Actual methods of reactor closing, i.e. cover to vessel sealing, is based on the creation of an equal load to the sealing circumference by tensioning all reactor studs with an equal force. This method ensures leak tightness through equal compression of the reactor seal in normal circumstances and is largely applied for all types of reactors throughout many generations and designs of nuclear power stations. The tension generated in each reactor stud is controlled indirectly by measuring the reactor stud elongation while under stress. Most studs are designed to measure this elongation easily by conventional or more advanced systems (from individual clock gauge to integrated digital transmission to a computer screen). It is this elongation value, prescribed by the reactor vessel/cover manufacturer which must be respected and demonstrated during all reactor closing operations, weather they take place for initial hydro testing, refuelling operations or periodical hydraulic tests of the primary circuit. Closing (and re-opening) of reactor vessels has become a routine operation as it is required for fuel reloading of the reactor core. This operation is performed on all PWR and BWR type of reactors with a large variety of tooling. As most of the utilities have implemented maintenance optimisation programs, the refuelling outage is reduced to a sequence of activities that allow quick and efficient refuelling of the core. The performance and efficiency of instrumentation and tooling deployed during these essential activities are of the utmost importance to minimise the critical path of the refuelling outage. Today, in support of outage performance, many utilities have invested in new and refurbished tooling to allow quick and efficient opening and closing of the reactor vessel. The features and properties of the most performing multi stud tensioning machines currently in service in nuclear power stations world wide (Africa, Europe, Asia and USA) are presented in the paper

  12. Health requirements for nuclear reactor operators

    International Nuclear Information System (INIS)

    1980-05-01

    The health prerequisites established for the qualification of nuclear reactor operators according to CNEN-NE-1.01 Guidelines Licensing of nuclear reactor operators, CNEN-12/79 Resolution, are described. (M.A.) [pt

  13. Water Reactor Fuel Performance Meeting 2008

    International Nuclear Information System (INIS)

    2008-10-01

    This meeting contains articles of the Water Reactor Fuel Performance Meeting 2008 of Korean Nuclear Society, Atomic Energy Society of Japan, Chinese Nuclear Society, European Nuclear Society and American Nuclear Society. It was held on Oct. 19-23, 2008 in Seoul, Korea and subject of Meeting is 'New Clear' Fuel - A green energy solution. This proceedings is comprised of 5 tracks. The main topic titles of track are as follows: Advances in water reactor fuel technology, Fuel performance and operational experience, Transient fuel behavior and safety-related issues, Fuel cycle, spent fuel storage and transportations and Fuel modeling and analysis. (Yi, J. H.)

  14. PLUS7TM In-Reactor Operating Performance and Economics

    International Nuclear Information System (INIS)

    Kim, Kyutae; Jang, Youngki; Choi, Joonhyung; Lee, Jinseok; Kim, Yoonho; Suh, Jungmin

    2006-01-01

    KNFC has developed an advanced fuel, PLUS7 TM , for the Korean Standard Nuclear Power Plants(KSNPs) through the joint development program with Westinghouse. With the help of various out-of-pile tests, it is found that the PLUS7 TM shows much better performance than the current fuel, GUARDIAN TM from the safety and economy points of view. Now four Lead Test Assembles(LTAs) of the PLUS7 TM are being irradiated for the 3 rd cycle after the successful completion of the 1 st and 2 nd irradiation cycles. During the 1 st and 2 nd irradiation cycles, no fuel failure was observed at LTAs and their nuclear-related parameters matched their design values well. During the overhaul period, on the other hand, pool side examinations were performed for four LTAs to generate key in-reactor fuel performance data such as fuel rod and assembly growths, fuel rod-to-top nozzle gap, fuel assembly bow and twist, fuel rod bow, spacer grid width, fuel rod diameter and fuel rod oxide layer thickness. It is found that all measured values are bounded by upper and lower predicted ones. The detailed economic analyses have shown that significant fuel cycle cost can be reduced by more than one million dollars per cycle of one KSNP with the introduction of the PLUS7 TM assembly. Furthermore, more than one hundred million dollars with power up-rating of 5% can be saved annually for currently operating eight KSNPs, which is easily and safety achievable with the PLUS7 TM assembly

  15. Fractional power operation of tokamak reactors

    International Nuclear Information System (INIS)

    Mau, T.K.; Vold, E.L.; Conn, R.W.

    1986-01-01

    Methods to operate a tokamak fusion reactor at fractions of its rated power, identify the more effective control knobs and assess the impact of the requirements of fractional power operation on full power reactor design are explored. In particular, the role of burn control in maintaining the plasma at thermal equilibrium throughout these operations is studied. As a prerequisite to this task, the critical physics issues relevant to reactor performance predictions are examined and some insight into their impact on fractional power operation is offered. The basic tool of analysis consists of a zero-dimensional (0-D) time-dependent plasma power balance code which incorporates the most advanced data base and models in transport and burn plasma physics relevant to tokamaks. Because the plasma power balance is dominated by the transport loss and given the large uncertainty in the confinement model, the authors have studied the problem for a wide range of energy confinement scalings. The results of this analysis form the basis for studying the temporal behavior of the plasma under various thermal control mechanisms. Scenarios of thermally stable full and fractional power operations have been determined for a variety of transport models, with either passive or active feedback burn control. Important power control parameters, such as gas fueling rate, auxiliary power and other plasma quantities that affect transport losses, have also been identified. The results of these studies vary with the individual transport scaling used and, in particular, with respect to the effect of alpha heating power on confinement

  16. Digital computer operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Colley, R.W.

    1984-01-01

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state

  17. Pressurised water reactor operation

    International Nuclear Information System (INIS)

    Birnie, S.; Lamonby, J.K.

    1987-01-01

    The operation of a pressurized water reactor (PWR) is described with respect to the procedure for a unit start-up. The systems details and numerical data are for a four loop PWR station of the design proposed for Sizewell-'B', United Kingdom. A description is given of: the initial conditions, filling the reactor coolant system (RCS), heat-up and pressurisation of the RCS, secondary system preparations, reactor start-up, and reactivity control at power. (UK)

  18. Operational reactor physics analysis codes (ORPAC)

    International Nuclear Information System (INIS)

    Kumar, Jainendra; Singh, K.P.; Singh, Kanchhi

    2007-07-01

    For efficient, smooth and safe operation of a nuclear research reactor, many reactor physics evaluations are regularly required. As part of reactor core management the important activities are maintaining core reactivity status, core power distribution, xenon estimations, safety evaluation of in-pile irradiation samples and experimental assemblies and assessment of nuclear safety in fuel handling/storage. In-pile irradiation of samples requires a prior estimation of the reactivity load due to the sample, the heating rate and the activity developed in it during irradiation. For the safety of personnel handling irradiated samples the dose rate at the surface of shielded flask housing the irradiated sample should be less than 200 mR/Hr.Therefore, a proper shielding and radioactive cooling of the irradiated sample are required to meet the said requirement. Knowledge of xenon load variation with time (Startup-curve) helps in estimating Xenon override time. Monitoring of power in individual fuel channels during reactor operation is essential to know any abnormal power distribution to avoid unsafe situations. Complexities in the estimation of above mentioned reactor parameters and their frequent requirement compel one to use computer codes to avoid possible human errors. For efficient and quick evaluation of parameters related to reactor operations such as xenon load, critical moderator height and nuclear heating and reactivity load of isotope samples/experimental assembly, a computer code ORPAC (Operational Reactor Physics Analysis Codes) has been developed. This code is being used for regular assessment of reactor physics parameters in Dhruva and Cirus. The code ORPAC written in Visual Basic 6.0 environment incorporates several important operational reactor physics aspects on a single platform with graphical user interfaces (GUI) to make it more user-friendly and presentable. (author)

  19. Method of operating a reactor

    International Nuclear Information System (INIS)

    Oosumi, Katsumi; Yamamoto, Michiyoshi.

    1980-01-01

    Purpose: To prevent stress corrosion cracking in the structural material of a reactor pressure vessel. Method: Prior to the starting of a reactor, the reactor pressure vessel is evacuated to carry out degassing of reactor water, and, at the same time, reactor water is heated. After reactor water is heated to a predetermined temperature, control rods are extracted to start nuclear heating. While the temperature of the reactor water is in a temperature range where elution of a metal which is a structural material of the reactor pressure vessel becomes vigorous and the sensitivity to the stress corrosion cracks increases, the reactor is operated at the maximum permissible temperature raising speed or maximum permissible cooling speed. (Aizawa, K.)

  20. Constrained model predictive control for load-following operation of APR reactors

    International Nuclear Information System (INIS)

    Kim, Jae Hwan; Lee, Sim Won; Kim, Ju Hyun; Na, Man Gyun; Yu, Keuk Jong; Kim, Han Gon

    2012-01-01

    The load-following operation of APR+ reactor is needed to control the power effectively using the control rods and to restrain the reactivity control from using the boric acid for flexibility of plant operation. Usually, the reason why the disproportion of axial flux distribution occurs during load-following operation is xenon-induced oscillation. The xenon has a very high absorption cross-section and makes the impact on the reactor delayed by the iodine precursor. The power maneuvering using automatically load-following operation has advantage in terms of safety and economic operation of the reactor, so the controller has to be designed efficiently. Therefore, an advanced control method that meets the conditions such as automatic control, flexibility, safety, and convenience is necessary to load-following operation of APR+ reactor. In this paper, the constrained model predictive control (MPC) method is applied to design APR reactor's automatic load-following controller for the integrated thermal power level and axial shape index (ASI) control. Some controllers use only the current tracking command, but MPC considers future commands in addition to the current tracking command. So, MPC can achieve better tracking performance than others. Furthermore, an MPC is to used in many industrial process control systems. The basic concept of the MPC is to solve an optimization problem for a finite future time interval at present time and to implement the first optimal control input as the current control input. The KISPAC-1D code, which models the APR+ nuclear power plants, is interfaced to the proposed controller to verify the tracking performance of the reactor power level and ASI. It is known that the proposed controller exhibits very fast tracking responses

  1. Reactor core performance calculating device

    International Nuclear Information System (INIS)

    Tominaga, Kenji; Bando, Masaru; Sano, Hiroki; Maruyama, Hiromi.

    1995-01-01

    The device of the present invention can calculate a power distribution efficiently at high speed by a plurality of calculation means while taking an amount of the reactor state into consideration. Namely, an input device takes data from a measuring device for the amount of the reactor core state such as a large number of neutron detectors disposed in the reactor core for monitoring the reactor state during operation. An input data distribution device comprises a state recognition section and a data distribution section. The state recognition section recognizes the kind and amount of the inputted data and information of the calculation means. The data distribution section analyzes the characteristic of the inputted data, divides them into a several groups, allocates them to each of the calculation means for the purpose of calculating the reactor core performance efficiently at high speed based on the information from the state recognition section. A plurality of the calculation means calculate power distribution of each of regions based on the allocated inputted data, to determine the power distribution of the entire reactor core. As a result, the reactor core can be evaluated at high accuracy and at high speed irrespective of the whole reactor core or partial region. (I.S.)

  2. Considerations of Human Factors in the Design and Operation of Research Reactors

    International Nuclear Information System (INIS)

    Shokr, A.M.

    2015-01-01

    The feedback from the severe accidents occurred at nuclear power plants showed that safety of nuclear installations does not depend only on technical matters but also on human performance. Human errors can initiate an event or can make , by intervention, the event consequences worse. Human factors are of a particular importance for research reactors since the status of these facilities change frequently and the operators have an easy access to the reactor core and to the associated experimental facilities. This paper discusses the experience with human factors and their impact on the safety of research reactors and application of technical and administrative provisions to address these factors in the design and operation phases of research reactors for continuous improvements in safety and performance of these facilities

  3. Microorganism selection and performance in bioslurry reactors treating PAH-contaminated soil.

    Science.gov (United States)

    Cassidy, D P; Hudak, A J

    2002-09-01

    A continuous-flow reactor (CSTR) and a soil slurry-sequencing batch reactor (SS-SBR) were operated in 81 vessels for 200 days to treat a soil contaminated with polycyclic aromatic hydrocarbons (PAH). Filtered slurry samples were used to quantify bulk biosurfactant concentrations and PAH emulsification. Concentrations of Corynebacterium aquaticum, Flavobacterium mizutaii, Mycobacterium gastri, Pseudomonas aeruginosa, and Pseudomonas putida were determined using fatty acid methyl ester (FAME) analysis. The CSTR and SS-SBR selected microbial consortia with markedly different surfactant-producing and PAH-degrading abilities. Biosurfactant levels in the SS-SBR reached 4 times the critical micelle concentration (CMC) that resulted in considerable emulsification of PAH. In contrast, CSTR operation resulted in nomeasurable biosurfactant production. Total PAH removal efficiency was 93% in the SS-SBR, compared with only 66% in the CSTR, and stripping of PAH was 3 times less in the SS-SBR. Reversing the mode of operation on day 100 caused a complete reversal in microbial consortia and in reactor performance by day 140. These results show that bioslurry reactor operation can be manipulated to control overall reactor performance.

  4. Performance improvement of the Annular Core Pulse Reactor for reactor safety experiments

    International Nuclear Information System (INIS)

    Reuscher, J.A.; Pickard, P.S.

    1976-01-01

    The Annular Core Pulse Reactor (ACPR) is a TRIGA type reactor which has been in operation at Sandia Laboratories since 1967. The reactor is utilized in a wide variety of experimental programs which include radiation effects, neutron radiography, activation analysis, and fast reactor safety. During the past several years, the ACPR has become an important experimental facility for the United States Fast Reactor Safety Research Program and questions of interest to the safety of the LMFBR are being addressed. In order to enhance the capabilities of the ACPR for reactor safety experiments, a project to improve the performance of the reactor was initiated. It is anticipated that the pulse fluence can be increased by a factor of 2.0 to 2.5 utilizing a two-region core concept with high heat capacity fuel elements around the central irradiation cavity. In addition, the steady-state power of the reactor will be increased by about a factor of two. The new features of the improvements are described

  5. Experimental evaluation of an expert system for nuclear reactor operators

    International Nuclear Information System (INIS)

    Nelson, W.R.

    1984-10-01

    The United States Nuclear Regulatory Commission (USNRC) is supporting a program for the experimental evaluation of an expert system for nuclear reactor operators. A prototype expert system, called the Response Tree System, has been developed and implemented at INEL. The Response Tree System is designed to assess the status of a reactor system following an accident and recommend corrective actions to reactor operators. The system is implemented using color graphic displays and is driven by a computer simulation of the reactor system. Control of the system is accomplished using a transparent touch panel. Controlled experiments are being conducted to measure performance differences between operators using the Response Tree System and those not using it to respond to simulated accident situations. This paper summarizes the methodology and results of the evaluation of the Response Tree System, including the quantitative results obtained in the experiments thus far. Design features of the Response Tree System are discussed, and general conclusions regarding the applicability of expert systems in reactor control rooms are presented

  6. Comparative Study on Research Reactor Operation Requirements of IAEA and Korea

    International Nuclear Information System (INIS)

    Yune, Young Gill; Chang, Woo Joon; Lee, Jinho

    2014-01-01

    The IAEA safety requirements represent a consensus view of the IAEA's member states and encompass the recommendations of international experts for the safety of the research reactor. The IAEA safety standards are acknowledged as a global standard by most countries in the world. Therefore, it is desirable to harmonize domestic safety requirements with those of the IAEA. Also, since the IAEA safety requirements include international endeavors to strengthen nuclear safety and to apply the latest nuclear safety technologies to nuclear facilities, a comparative analysis of the safety requirements of the IAEA and Korea for the research reactor will be beneficial to obtaining the insights to improve regulations of the research reactor in Korea. For the reason, a comparative study has been conducted for the research reactor operation safety requirements of the IAEA and Korea in this paper. This paper briefly introduced operation safety requirements in the NS-R-4, analysis methods of this study, and the analysis results. A comparative study has been performed on research reactor operation safety requirements of the IAEA and Korea. This study has identified some gaps in operation safety requirements for the NPP of Korea, comparing with those for the research reactor of the IAEA in the following areas: periodic safety assessment, utilization and modification of the reactor, extended shutdown, inspection/testing/maintenance, operating organization, emergency planning, and commissioning

  7. Reactor operation feed-back in France

    International Nuclear Information System (INIS)

    Feltin, C.; Fourest, B.; Libmann, J.

    1982-09-01

    The Nuclear Safety Department (DSN), technical support of French Safety Authorities, is, in particular, in charge of the analysis of reactor operation and of measures taken consequently to incidents. It proposed the criteria used to select significant incidents; it analyzes such incidents. DSN also analyzes the operating experience of each plant, several years after starting. It examines foreign incidents to assess in what extent lessons learned can be applied to french reactors. The examples presented show that to improve the safety of units operation, the experience feed-back leads to make arrangements, or modifications concerning not only circuits or materials but often procedures. Moreover they show the importance of procedures concerning the operations carried out during reactor shutdown

  8. Method of reactor operation

    International Nuclear Information System (INIS)

    Maeda, Katsuji.

    1982-01-01

    Purpose: To prevent stress corrosion cracks in stainless steels caused from hydrogen peroxide in reactor operation in which the density of hydrogen peroxide in the reactor water is controlled upon reactor start-up. Method: A heat exchanger equipped with a heat source for applying external heat is disposed into the recycling system for reactor coolants. Upon reactor start-up, the coolants are heated by the heat exchanger till arriving at a temperature at which the dissolving rate is faster than the forming rate of hydrogen peroxide in the coolants, and nuclear heating is started after reaching the above temperature. The temperature of the reactor water is increased in such a manner and, when it arrives at 140 0 C, extraction of control elements is started and the heat source for the heat exchanger is interrupted simultaneously. In this way spikes in the density of hydrogen peroxide are suppressed upon reactor start-up to thereby decrease the stress corrosion cracks in stainless steels. (Horiuchi, T.)

  9. Regulation for installation and operation of marine reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The regulation is defined under the law for the regulations of nuclear source materials, nuclear fuel materials and reactors and the provisions of the order for execution of the law. The regulation is applied to marine reactors and reactors installed in foreign nuclear ships. Basic concepts and terms are explained, such as: radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; safeguarded area; inspected surrounding area and employee. The application for permission of installation of reactors shall list maximum continuous thermal power, location and general structure of reactor facilities, structure and equipment of reactors and treatment and storage facilities of nuclear fuel materials, etc. The application for permission of reactors installed in foreign ships shall describe specified matters according to the provisions for domestic reactors. The operation program of reactors for three years shall be filed to the Minister of Transportation for each reactor every fiscal year from that year when the operation is expected to start. Records shall be made for each reactor and kept for particular periods on inspection of reactor facilities, operation, fuel assembly, control of radiation, maintenance and others. Exposure doses, inspection and check up of reactor facilities, operation of reactors, transport and storage of nuclear fuel materials, etc. are designated in detail. (Okada, K.)

  10. TARMS, an on-line boiling water reactor operation management system

    International Nuclear Information System (INIS)

    Iwamoto, T.; Sakurai, S.; Uematsu, H.; Tsuiki, M.; Makino, K.

    1984-01-01

    The TARMS (Toshiba Advanced Reactor Management System) software package was developed as an effective on-line, on-site tool for boiling water reactor core operation management. It was designed to support a complete function set to meet the requirement to the current on-line process computers. The functions can be divided into two categories. One is monitoring of the present core power distribution as well as related limiting parameters. The other is aiding site engineers or reactor operators in making the future reactor operating plan. TARMS performs these functions with a three-dimensional BWR core physics simulator LOGOS 2, which is based on modified one-group, coarse-mesh nodal diffusion theory. A method was developed to obtain highly accurate nodal powers by coupling LOGOS 2 calculations with the readings of an in-core neutron flux monitor. A sort of automated machine-learning method also was developed to minimize the errors caused by insufficiency of the physics model adopted in LOGOS 2. In addition to these fundamental calculational methods, a number of core operation planning aid packages were developed and installed in TARMS, which were designed to make the operator's inputs simple and easy. (orig.) [de

  11. RA reactor operation and maintenance, Annual report 1974

    International Nuclear Information System (INIS)

    Milosevic, D. et al

    1974-12-01

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m 2 of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems [sr

  12. Performance of metallic fuels in liquid-metal fast reactors

    International Nuclear Information System (INIS)

    Seidel, B.R.; Walters, L.C.; Kittel, J.H.

    1984-01-01

    Interest in metallic fuels for liquid-metal fast reactors has come full circle. Metallic fuels are once again a viable alternative for fast reactors because reactor outlet temperature of interest to industry are well within the range where metallic fuels have demonstrated high burnup and reliable performance. In addition, metallic fuel is very tolerant of off-normal events of its high thermal conductivity and fuel behavior. Futhermore, metallic fuels lend themselves to compact and simplified reprocessing and refabrication technologies, a key feature in a new concept for deployment of fast reactors called the Integral Fast Reactor (IFR). The IFR concept is a metallic-fueled pool reactor(s) coupled to an integral-remote reprocessing and fabrication facility. The purpose of this paper is to review recent metallic fuel performance, much of which was tested and proven during the twenty years of EBR-II operation

  13. Operation experience at the Neuherberg Research Reactor (FRN) with several modifications of reactor components

    Energy Technology Data Exchange (ETDEWEB)

    Demmeler, M; Rau, G [Gesellschaft fuer Strahlen- und Umweltforschung mbH, Neuherberg (Germany)

    1974-07-01

    Since the first full power operation in September 1972 up till now (Dec. 1973) the TRIGA Mark III reactor FRN has run more than 500 MWh in steady state operation and has been pulsed for 265 times. During startup experiments, neutron- and gamma-flux mapping has been performed with special technical devices in the core and in several irradiation positions, mainly in the thermal column and in the exposure room. Furthermore reactivity values of each fuel element have been measured at full power of 1 MW, thus enabling a more accurate burnup calculation. Troubles with the rotary specimen rack occurred at power rates above 280 kW; here, the lazy susan stuck, caused by thermal stress. Thus it will be replaced by a hydraulic-operated type, which has been developed at the TRIGA reactor Heidelberg. In order to increase irradiation capacity, a new core configuration has been set up a few months ago, replacing several fuel-reflector-elements by irradiation tubes within the grid-plate positions E-22, G-2, G-17 and G-36. Four additional fuel elements had to be inserted to compensate for the resulting reactivity losses. The original plan of regaining sufficient excess-reactivity by inserting a fuel element in grid-plate position A-l failed because of local boiling in the center of the core by 1 MW-operation. Experiments at the reactor started with the begin of routine-operation in September 1973. Up till now, a total of 450 neutron- and gamma- irradiations have been performed, mainly for neutron-activations. (author)

  14. Computer monitoring of the RB reactor operation

    International Nuclear Information System (INIS)

    Milovanovic, S.; Pesic, M.; Milovanovic, T.

    1998-01-01

    Personal computer based acquisition system designed for monitoring of operation of the RB experimental reactor in the Institute of Nuclear Sciences 'Vinca' (former 'Boris Kidric') and experiences acquired during its use are shown in this paper. The monitoring covers generally all nuclear aspects of the reactor operation (start-up, nominal power operation, power changing, shut down and maintenance), but the emphasis is put on: real time (especially fast changing) reactivity measurement; supervising time dependence of the safety rods positions during shut down, and detection of position inaccuracy or failure operation of safety/control rods during the reactor operation or maintenance. (author)

  15. Development of Advanced Monitoring System with Reactor Neutrino Detection Technique for Verification of Reactor Operations

    International Nuclear Information System (INIS)

    Furuta, H.; Tadokoro, H.; Imura, A.; Furuta, Y.; Suekane, F.

    2010-01-01

    Recently, technique of Gadolinium-loaded liquid scintillator (Gd-LS) for reactor neutrino oscillation experiments has attracted attention as a monitor of reactor operation and ''nuclear Gain (GA)'' for IAEA safeguards. When the thermal operation power is known, it is, in principle, possible to non-destructively measure the ratio of Pu/U in reactor fuel under operation from the reactor neutrino flux. An experimental program led by Lawrence Livermore National Laboratory and Sandia National Laboratories in USA has already demonstrated feasibility of the reactor monitoring by neutrinos at San Onofre Nuclear Power Station, and the Pu monitoring by neutrino detection is recognized as a candidate of novel technology to detect undeclared operation of reactor. However, further R and D studies of detector design and materials are still necessary to realize compact and mobile detector for practical use of neutrino detector. Considering the neutrino interaction cross-section and compact detector size, the detector must be set at a short distance (a few tens of meters) from reactor core to accumulate enough statistics for monitoring. In addition, although previous reactor neutrino experiments were performed at underground to reduce cosmic ray muon background, feasibility of the measurement at ground level is required for the monitor considering limited access to the reactor site. Therefore, the detector must be designed to be able to reduce external backgrounds extremely without huge shields at ground level, eg. cosmic ray muons and fast neutrons. We constructed a 0.76 ton Gd-LS detector, and carried out a reactor neutrino measurement at the experimental fast reactor JOYO in 2007. The neutrino detector was set up at 24.3m away from the reactor core at the ground level, and we understood the property of the main background; the cosmic-ray induced fast neutron, well. Based on the experience, we are constructing a new detector for the next experiment. The detector is a Gd

  16. Method of operating heavy water moderated reactors

    International Nuclear Information System (INIS)

    Masuda, Hiroyuki.

    1980-01-01

    Purpose: To enable stabilized reactor control, and improve the working rate and the safety of the reactor by removing liquid poison in heavy water while maintaining the power level constant to thereby render the void coefficient of the coolants negative in the low power operation. Method: The operation device for a heavy water moderated reactor comprises a power detector for the reactor, a void coefficient calculator for coolants, control rods inserted into the reactor, a poison regulator for dissolving poisons into or removing them out of heavy water and a device for removing the poisons by the poison regulator device while maintaining the predetermined power level or inserting the control rods by the signals from the power detector and the void coefficient calculator in the high temperature stand-by conditions of the reactor. Then, the heavy water moderated reactor is operated so that liquid poisons in the heavy water are eliminated in the high temperature stand-by condition prior to the start for the power up while maintaining the power level constant and the plurality of control rods are inserted into the reactor core and the void coefficient of the coolants is rendered negative in the low power operation. (Seki, T.)

  17. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  18. Preparation fo nuclear research reactors operators

    International Nuclear Information System (INIS)

    Roedel, G.

    1986-01-01

    The experience obtained with the training of operators of nuclear research reactors is presented. The main tool used in the experiments is the IPR-R1 reactor, a TRIGA MARK I type, owned by Nuclear Technology Development Centre (CDTN) of NUCLEBRAS. The structures of the Research Reactors Operators Training Course and of the Radiological Protection Course, as well as the Operators Qualifying and Requalifying Program, all of them prepared at CDTN are also presented. Mention is made of the application of similar experiments to other groups, such as students coming from Nuclear Sciences and Techniques Course of the Federal University of Minas Gerais. (Author) [pt

  19. Preparation of nuclear research reactors operators

    International Nuclear Information System (INIS)

    Roedel, G.

    1986-01-01

    The experience obtained with the training of operators of nuclear research reactors is presented. The main tool used in the experiments is the IPR-R1 reactor, a TRIGA MARK I type, owned by Nuclear Technology Development Centre (CDTN) of NUCLEBRAS. The structures of the Research Reactors Operators Training Course and of the Radiological Protection Course, as well as the Operators Qualifying and Requalifying Program, all of them prepared at CDTN, are also presented. Mention is made of the application of similar experiments to other groups, such as students coming from Nuclear Sciences and Techniques Course of the Federal University of Minas Gerais. (Author) [pt

  20. Annual report on operation, utilization and technical development of research reactors and hot laboratory

    International Nuclear Information System (INIS)

    1990-09-01

    This report describes the activities of the Department of Research Reactor Operation in fiscal year of 1989. It also presents some technical topics on the reactor operation and utilization in details. The Department is responsible for operation of the research reactors, JRR-2 and JRR-4, and the Hot Laboratory. The research reactor JRR-3 was reconstructed to enhance the performance for utilization. The first criticality was achieved on March 22, 1989, and it subsequently went into operation. In connection with the reactor operation, the various research and development activities in the area of fuel management, water chemistry, radiation monitoring and material irradiation have been made. In the Hot Laboratory, post-irradiation examinations of fuels and materials have been carried out along with the development of related techniques. (author)

  1. The heating operational summarization in three winters of a 5 MW test heating reactor

    International Nuclear Information System (INIS)

    Wang Dazhong; Dong Duo; Su Qingshan; Zhang Yajun

    1992-09-01

    The 5 MW THR (5 MW test heating reactor) is a new type reactor with inherent safety developed by INET (Institute of Nuclear Energy Technology). It is the first 'pressure vessel type' heating reactor in operation in the world. It was put into operation in November, 1989. Since then it has operated for three winter seasons. The total operation time has reached to 8174 hours and its availability of heating has reached to 99%. The advanced technology of this reactor has been proved in the past three years operation. The characteristics of power regulating, load following, reactivity disturbance and the variation of parameters under the condition of ATWS (anticipated transients without scram) were studied with experiments in 5 MW THR. The 5 MW THR is an ideal heating reactor and has outstanding performances

  2. Standards for safe operation of research reactors

    International Nuclear Information System (INIS)

    1996-01-01

    The safety of research reactors is based on many factors such as suitable choice of location, design and construction according to the international standards, it also depends on well trained and qualified operational staff. These standards determine the responsibilities of all who are concerned with the research reactors safe operation, and who are responsible of all related activities in all the administrative and technical stages in a way that insures the safe operation of the reactor

  3. Operating performance and reliability of CANDU PHWR fuel channels in Canada

    International Nuclear Information System (INIS)

    Strachan, B.; Brown, D.R.

    1983-03-01

    CANDU nuclear plants use many small-diameter high-pressure fuel channels. Good operating performance from the CANDU fuel channels has made a major contribution to the world-leading operating record of the CANDU nuclear power plants. As of 1982 December 31, there were 7,480 fuel channels installed in 18 CANDU reactors over 500 MW(e) in size. Eight of these reactors have been declared in-service and have accumulated 24,000 fuel channel-years of operation. The only significant operating problems with fuel channels have been the occurrence of leaking cracks in 70 fuel channels and a larger amount of axial creep on the early reactors than was originally provided for in the design. Both of these problems have been corrected on all CANDU reactors built since the Bruce GS 'A' station and the newer reactors should exhibit even better performance

  4. The use of computer graphics to assist in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1995-01-01

    A number of complex inspection and repair tasks have been carried out inside Nuclear Electric's gas cooled reactors using multi-link manipulators. The paper describes how computer graphics are integrated into the manipulator system and perform a key role during many phases of a project. Graphics simulation is used to assist with conceptual design, detailed path planning, rehearsals, quality assurance, demonstrations and, critically, as an on-line tool to assist the real-time operation of the equipment whilst performing complex in-reactor tasks. The techniques used are illustrated by recent examples of use to assist the inspection and repair of in-reactor components. (Author)

  5. Evaluation of the RSG-GAS Alpha-Beta Aerosol Contaminant Monitor Performance Under Reactor Operation Condition

    International Nuclear Information System (INIS)

    Hartoyo, Unggul; Setiawanto, Anto; Sumarno, Yulius

    2000-01-01

    Analysis to evaluate the RSG-GAS alpha-beta aerosol contaminant monitor performance was done. The high potential radiation working area such as in RSG-GAS is important to monitored for personal safety. Further it is necessary to assure that the system monitor is reliable enough under normal conditions as well as emergency condition. The method uses in this analysis are monitoring and comparing with the standard source. The standard course indicator and panel in main control room indicate that the result is 1 x 110 exp 9 Ci/m exp 3. Based on data monitor observation, the RSG-GAS alpha-beta aerosol contaminant monitor system under reactor operation condition has a good enough performance

  6. Determining the microwave coupling and operational efficiencies of a microwave plasma assisted chemical vapor deposition reactor under high pressure diamond synthesis operating conditions

    Energy Technology Data Exchange (ETDEWEB)

    Nad, Shreya [Department of Electrical and Computer Engineering, Michigan State University, East Lansing, Michigan 48824 (United States); Department of Physics and Astronomy, Michigan State University, East Lansing, Michigan 48824 (United States); Gu, Yajun; Asmussen, Jes [Department of Electrical and Computer Engineering, Michigan State University, East Lansing, Michigan 48824 (United States)

    2015-07-15

    The microwave coupling efficiency of the 2.45 GHz, microwave plasma assisted diamond synthesis process is investigated by experimentally measuring the performance of a specific single mode excited, internally tuned microwave plasma reactor. Plasma reactor coupling efficiencies (η) > 90% are achieved over the entire 100–260 Torr pressure range and 1.5–2.4 kW input power diamond synthesis regime. When operating at a specific experimental operating condition, small additional internal tuning adjustments can be made to achieve η > 98%. When the plasma reactor has low empty cavity losses, i.e., the empty cavity quality factor is >1500, then overall microwave discharge coupling efficiencies (η{sub coup}) of >94% can be achieved. A large, safe, and efficient experimental operating regime is identified. Both substrate hot spots and the formation of microwave plasmoids are eliminated when operating within this regime. This investigation suggests that both the reactor design and the reactor process operation must be considered when attempting to lower diamond synthesis electrical energy costs while still enabling a very versatile and flexible operation performance.

  7. Performance of self-powered neutron detectors in pressurized water reactors

    International Nuclear Information System (INIS)

    Warren, H.D.; Bozarch, D.P.

    1977-01-01

    A typical Babcock and Wilcox pressurized water reactor (PWR) contains 364 rhodium self-powered neutron detectors (SPNDs) and 52 background detectors. The detectors are inserted into the reactor core in 52 dry, multidetector assemblies. Each assembly contains seven SPNDs and one background detector. By mid-1977, eight B and W PWRs, each fitted with SPNDs, were in operation. Many of the SPNDs have operated successfully for more than four years. This paper describes the operational performance of the SPNDs and special tests conducted to improve that performance. Topics included are (1) insulation performance versus neutron dose to the SPND, (2) background signals in the leadwire region of the SPND, and (3) depletion of the SPND emitter versus absorbed neutron dose

  8. Improvement of daily load-following operation for boiling water reactors

    International Nuclear Information System (INIS)

    Kiguchi, Takashi; Kurihara, Kunitoshi; Sakurai, Mikio; Joge, Toshio; Asami, Kazuo.

    1980-01-01

    Recently, with the increase of the proportion of nuclear power generation to the total amount of power generation of electric power systems, the needs of daily load-following operation of nuclear power stations have heightened, accordingly the study on the method of daily load-following operation has been carried out for BWRs. In this study, by the combined use of the flow rate control of core coolnat being operated easily and the operation of control rods, the BWR system with the daily load-following performance of 100% power output in daytime and 50% power output at night was the target of development. For the purpose, the change of core characteristics during load-following was grasped analytically, and the range of load change was investigated. At the same time, as the first stage of developing operation control and monitoring system, the reactor output-adjusting device which makes generator output automatically follow the target load change pattern by the flow rate control of core coolnat, and the equipment for monitoring core performance on line were developed. The analysis of the method of daily load-following operation in present-day BWRs, the study on the improvement of load-following operation performance, the reactor output-adjusting device are described. (Kako, I.)

  9. A logic scheme for regulating safe operation of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, E E [Reactor Department, Nuclear Research Center, Atomic Energy Authority, Cairo (Egypt); Effat, A; Rahman, F A [Operational Saety Dept, National Center of Nuclear Safety and Radiation Control Atomic Energy Authority, Cairo (Egypt)

    1997-12-31

    This investigation presents a logic scheme for regulating the safe operation of research reactor in accordance with the new revision of SS-35 and revised by the 10 CFR. It emphasizes the regulatory inspection and enforcement (RI end E) during the reactor operation phase. IT is developed to provide information, guidance and recommendations to be taken when constructing the RI and E program that could be applied to the operational phase of the egyptian Research Reactors. In the operational phase, the regulatory inspection (RI) means an examination, observation, measurement, or test undertaken or on behalf of the nuclear regulatory body (NRB) during operation to verify that the nuclear materials, components, systems and structures as well operational activities, processes, procedures and personnel competence and performance are in accordance with the requirements established or the provisions approved by NRB or specified in the operational license or contained in regulations. Regulatory inspection includes both routine and non-routine ones. Any of them may be announced or unannounced. The problems identified by the RI must be resolved by the proper RE actions. The RE actions include investigative and corrective RE actions. These RI and E procedures for regulating safe operation of research reactors are presented as flow charts and then developed as a computer logic scheme. The software program is very efficient, very friendly, very simple and is interactive in nature such that the program asks the user certain questions about essential steps that guide the (RI and E) for research reactors, and user responds. The program proceeds based on this response until all the necessary steps for (RI and E) are accomplished. 5 figs.

  10. Reactor technology: power conversion systems and reactor operation and maintenance

    International Nuclear Information System (INIS)

    Powell, J.R.

    1977-01-01

    The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He 3 reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored

  11. Five years of operating the TRIGA Mainz reactor

    International Nuclear Information System (INIS)

    Benedict, Georg

    1970-01-01

    Considerable obstacles had to be surmounted before TRIGA MAINZ, first TRIGA reactor built in Germany, reached initial criticality in 1965. Subsequent five years' operation did not raise any major problems. The facility has proven quite reliable and particularly well suited for the purposes of the nuclear chemistry research program pursued at Mainz University. Extensive use is made of the pulse mode of operation. As a result, fuel elements are obviously somewhat overstressed, even though most pulses performed are of the 1.50 dollar size. Maximum licensed steady state power of 100 kW till now has met the requirements of most experiments. However, efforts are in progress to improve irradiation conditions by increasing the reactor power to 300 kW. (author)

  12. Effect of post-digestion temperature on serial CSTR biogas reactor performance

    DEFF Research Database (Denmark)

    Boe, Kanokwan; Karakashev, Dimitar Borisov; Trably, Eric

    2009-01-01

    The effect of post-digestion temperature on a lab-scale serial continuous-flow stirred tank reactor (CSTR) system performance was investigated. The system consisted of a main reactor operated at 55 degrees C with hydraulic retention time (HRT) of 15 days followed by post-digestion reactors with HRT...

  13. Operation and maintenance of 1MW PUSPATI TRIGA reactor

    International Nuclear Information System (INIS)

    Adnan Bokhari; Mohammad Suhaimi Kassim

    2006-01-01

    The Malaysian Research Reactor, Reactor TRIGA PUSPATI (RTP) has been successfully operated for 22 years for various experiments. Since its commissioning in June 1982 until December 2004, the 1MW pool-type reactor has accumulated more than 21143 hours of operation, corresponding to cumulative thermal energy release of about 14083 MW-hours. The reactor is currently in operation and normally operates on demand, which is normally up to 6 hours a day. Presently the reactor core is made up of standard TRIAGA fuel element consists of 8.5 wt%, 12 wt% and 20 wt% types; 20%-enriched and stainless steel clad. Several measures such as routine preventive maintenance and improving the reactor support systems have been taken toward achieving this long successful operation. Besides normal routine utilization like other TRIGA reactors, new strategies are implemented for effective increase in utilization. (author)

  14. Operational experience of the Marcoule reactors

    International Nuclear Information System (INIS)

    Conte, F.

    1963-01-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [fr

  15. Core design of long life-cycle fast reactors operating without reactivity margin

    International Nuclear Information System (INIS)

    Aristova, E. N.; Baydin, D. F.; Gol'din, V. Y.; Pestryakova, G. A.; Stoynov, M. I.

    2012-01-01

    In this paper we consider a possibility of designing a fast reactor core that operates without reactivity margin for a long time. This study is based on the physical principle of fast reactor operating in a self-adjustable neutron-nuclear regime (SANNR-1) introduced by L.P. Feoktistov (1988-1993) and improved by V. Ya. Gol'din SANNR-2 (1995). The mathematical modeling of active zones of fast reactors in SANNR modes is held by authors since 1992. The numerical simulation is based on solving the neutron transport equation coupled with quasi-diffusion equations. The calculations have been performed using standard 26 energy groups. We use a hierarchy of spatial models of 1D, 1.5D, 2D, and 3D geometries. The spatial models of higher dimensionality are used for verification of results. The calculations showed that operation of the reactor in this mode increases its efficiency, safety and simplifies management. It is possible to achieve continuous work of the reactor in SANNR-2 during 7-10 years without fuel overloads by means of further optimization of the mode. Small reactivity margin is used only for the reactor start up. After first 10-15 days the reactor in SANNR-2 operates without reactivity margin. (authors)

  16. The IPR-R1 TRIGA Mark I Reactor in 39 years: Operations and general improvements

    International Nuclear Information System (INIS)

    Maretti Junior, Fausto; Prado Fernandes, Marcio; Oliveira, Paulo Fernando; Alves de Amorim, Valter

    1999-01-01

    The nuclear IPR-R1 TRIGA Mark I Reactor operating in the Nuclear Technology Development Center, originally Institute for Radioactive Research in Minas Gerais, Brazil, was dedicated in November 11, 1960. Initially operating for the production of radioisotopes for different uses, it started later to be used in large scale for neutron activation analysis and training of operators for nuclear power plants. Many improvements have been made throughout these years to provide a better performance in its operation and safety conditions. A new cooling system to operate until 300 kW, a new control rod mechanism, an aluminum tank for the reactor pool, an optimization in the pneumatic system, a new reactor control console and a general remodeling of the reactor laboratory were some of the improvements added. To prevent and mitigate the ageing effects, the reactor operation personnel is starting a program to minimize future operation problems. This paper describes the improvements made, the results obtained during the past 39 years, and the precautions taken to ensure future safe operation of the reactor to give operators better conditions of safe work. (author)

  17. Transient two-phase performance of LOFT reactor coolant pumps

    International Nuclear Information System (INIS)

    Chen, T.H.; Modro, S.M.

    1983-01-01

    Performance characteristics of Loss-of-Fluid Test (LOFT) reactor coolant pumps under transient two-phase flow conditions were obtained based on the analysis of two large and small break loss-of-coolant experiments conducted at the LOFT facility. Emphasis is placed on the evaluation of the transient two-phase flow effects on the LOFT reactor coolant pump performance during the first quadrant operation. The measured pump characteristics are presented as functions of pump void fraction which was determined based on the measured density. The calculated pump characteristics such as pump head, torque (or hydraulic torque), and efficiency are also determined as functions of pump void fractions. The importance of accurate modeling of the reactor coolant pump performance under two-phase conditions is addressed. The analytical pump model, currently used in most reactor analysis codes to predict transient two-phase pump behavior, is assessed

  18. Regulation for installation and operation of experimental-research reactor

    International Nuclear Information System (INIS)

    1979-01-01

    The ordinance is stipulated under the Law for regulation of nuclear raw materials, nuclear fuel materials and reactors and the provisions for installation and operation of reactor in the order for execution of the law. Basic concepts and terms are defined, such as, radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; preserved area; inspected surrounding area and employee. An application for permission of installation of reactor shall list such matters as: the maximum continuous thermal output of reactor; location and general construction of reactor facilities; construction and equipment of the main reactor and other facilities for nuclear fuel materials; cooling and controlling system and radioactive waste, etc. An operation plan of reactor for three years shall be filed till January 31 of the fiscal year preceding that one the operation begins. Records shall be made and kept for specified periods respectively on inspection of reactor facilities, operation, fuel assembly, radiation control, maintenance, accidents of reactor equipment and weather. Detailed rules are settled for entrance limitation to controlled area, exposure dose, inspection, check up and regular independent examination of reactor facilities, operation of reactor, transportation of substances contaminated by nuclear fuel materials within the works and storage, etc. (Okada, K.)

  19. Operator Support System for Pressurized Water Reactor

    International Nuclear Information System (INIS)

    Wei Renjie; Shen Shifei

    1996-01-01

    Operator Support System for Pressurized Water Reactor (OSSPWR) has been developed under the sponsorship of IAEA from August 1994. The project is being carried out by the Department of Engineering Physics, Tsinghua University, Beijing, China. The Design concepts of the operator support functions have been established. The prototype systems of OSSPWR has been developed as well. The primary goal of the project is to create an advanced operator support system by applying new technologies such as artificial intelligence (AI) techniques, advanced communication technologies, etc. Recently, the advanced man-machine interface for nuclear power plant operators has been developed. It is connected to the modern computer systems and utilizes new high performance graphic displays. (author). 6 refs, 4 figs

  20. Reactor Operations informal monthly report December 1994

    International Nuclear Information System (INIS)

    1994-12-01

    Reactor operations at the MRR and HFBR reactors at Brookhaven National Laboratory are presented for December 1994. Reactor run-time and power levels, instrumentation, mechanical maintenance, occurrence reports, and safety information are included

  1. RBMK power unit operational performance investigation while false coming into action of the emergency reactor cooling system

    International Nuclear Information System (INIS)

    Emel'yanov, I.Ya.; Aleksakov, A.N.; Vasilevskij, V.P.; Labazov, V.N.; Nikolaev, E.V.; Podlazov, L.N.; Rogov, V.D.; Shevchenko, V.V.

    1984-01-01

    Regimes of RBMK reactor operation during false coming into action of the emergency reactor cooling system (ERCS), which might occur in the case of faults in the automation systems or erroneous actions of operator have been investigated. At that, thepe exists a probability of water supply from ERCS to one half of the reactor, which results in a sharp change of boiling regime, and due to void reactivity effect it causes the neutron field disturbance. Change in flow rate and enthalpy of coolant, as well as changes of neutron flux in the left and right halves of the reactor at ERCS response and during operation of the whole system of automatic control of power and system of local automatic control of power - local emergency protection - have been studied. The investigations have been carried out for different values of vapour effect of void reactivity effect and for time ranges from 0 to 40 s. The calculations are made using a model, describing spatial dynamics of reactor in two-dimensional approximation with 54 nodes. The model describes neutron-physics and thermohydraulic processes and it is realized using the BEhSM-6 computer. It is pointed out that one system of automatic control of power or local emergency protection (i.e. without the shut-off system), is insufficient for the compensation of disturbances appearing as a result of false ERCS coming into operation

  2. Completely automated nuclear reactors for long-term operation

    International Nuclear Information System (INIS)

    Teller, E.; Ishikawa, M.; Wood, L.

    1996-01-01

    The authors discuss new types of nuclear fission reactors optimized for the generation of high-temperature heat for exceedingly safe, economic, and long-duration electricity production in large, long-lived central power stations. These reactors are quite different in design, implementation and operation from conventional light-water-cooled and -moderated reactors (LWRs) currently in widespread use, which were scaled-up from submarine nuclear propulsion reactors. They feature an inexpensive initial fuel loading which lasts the entire 30-year design life of the power-plant. The reactor contains a core comprised of a nuclear ignitor and a nuclear burn-wave propagating region comprised of natural thorium or uranium, a pressure shell for coolant transport purposes, and automatic emergency heat-dumping means to obviate concerns regarding loss-of-coolant accidents during the plant's operational and post-operational life. These reactors are proposed to be situated in suitable environments at ∼100 meter depths underground, and their operation is completely automatic, with no moving parts and no human access during or after its operational lifetime, in order to avoid both error and misuse. The power plant's heat engine and electrical generator subsystems are located above-ground

  3. Modified-open fuel cycle performance with breed-and-burn advanced reactor concepts

    International Nuclear Information System (INIS)

    Heidet, Florent; Kim, Taek K.; Taiwo, Temitope A.

    2011-01-01

    Recent advances in fast reactor designs enable significant increase in the uranium utilization in an advanced fuel cycle. The category of fast reactors, collectively termed breed-and-burn reactor concepts, can use a large amount of depleted uranium as fuel without requiring enrichment with the exception of the initial core critical loading. Among those advanced concepts, some are foreseen to operate within a once-through fuel cycle such as the Traveling Wave Reactor, CANDLE reactor or Ultra-Long Life Fast Reactor, while others are intended to operate within a modified-open fuel cycle, such as the Breed-and-Burn reactor and the Energy Multiplier Module. This study assesses and compares the performance of the latter category of breed-and-burn reactors at equilibrium state. It is found that the two reactor concepts operating within a modified-open fuel cycle can significantly improve the sustainability and security of the nuclear fuel cycle by decreasing the uranium resources and enrichment requirements even further than the breed-and-burn core concepts operating within the once-through fuel cycle. Their waste characteristics per unit of energy are also found to be favorable, compared to that of currently operating PWRs. However, a number of feasibility issues need to be addressed in order to enable deployment of these breed-and-burn reactor concepts. (author)

  4. Human Factors Engineering (HFE) insights for advanced reactors based upon operating experience

    International Nuclear Information System (INIS)

    Higgins, J.; Nasta, K.

    1997-01-01

    The NRC Human Factors Engineering Program Review Model (HFE PRM, NUREG-0711) was developed to support a design process review for advanced reactor design certification under 10CFR52. The HFE PRM defines ten fundamental elements of a human factors engineering program. An Operating Experience Review (OER) is one of these elements. The main purpose of an OER is to identify potential safety issues from operating plant experience and ensure that they are addressed in a new design. Broad-based experience reviews have typically been performed in the past by reactor designers. For the HFE PRM the intent is to have a more focussed OER that concentrates on HFE issues or experience that would be relevant to the human-system interface (HSI) design process for new advanced reactors. This document provides a detailed list of HFE-relevant operating experience pertinent to the HSI design process for advanced nuclear power plants. This document is intended to be used by NRC reviewers as part of the HFE PRM review process in determining the completeness of an OER performed by an applicant for advanced reactor design certification. 49 refs

  5. Operational methods of the fluidized bed nuclear reactor

    International Nuclear Information System (INIS)

    Borges, V.; Sefidvash, F.

    1993-01-01

    The operational curve of reactivity as a function of porosity of the Fluidized Bed Nuclear Reactor is presented. The strategies for start-up, shut-down and maintaining the reactor critical during operation are described. The inherent safety of the reactor from neutronic point of view under steady state condition is demonstrated. (author)

  6. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  7. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1987-01-01

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction [sr

  8. N Reactor thermal plume characterization during Pu-only mode of operation

    Energy Technology Data Exchange (ETDEWEB)

    Ecker, R.M.; Thompson, F.L.; Whelan, G.

    1983-04-01

    Pacific Northwest Laboratories (PNL) performed field and modeling studies -from March 1982 through June 1983 to characterize the thermal plume from the N Reactor heated water outfall while the N Reactor operated in the Pu-only mode. Part 1 of this report deals with the field studies conducted to characterize the N Reactor thermal plume while in the Pu-only mode of operation. It includes a description of the study area, a description of field tasks and procedures, and data collection results and discussion. Part 2 describes the computer simulation of the thermal plume under different flow conditions and the calibration of the model used. It includes a description of the computer model and the assumptions on which it is based, a presentation of the input data used in this application, and a discussion of modeling results. Because the field studies were restricted by the NPOES permit variance to the spring months when high Columbia River flows prevail the mathematical modeling of the N Reactor thermal plume while the reactor operates in the Pu-only mode is instrumental in characterizing the plume during low Columbia River flows.

  9. Design and Construction of Operation Bridge for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Choi, Jinbok; Lee, Jongmin; Oh, Jinho

    2015-01-01

    The operation bridge contains a lower working deck mounted on a saddle that travels on rails. Upright members are mounted on the saddle to support the upper structure and two hoist monorails. The saddle contains an anti-derail system that is composed of seismic lugs and guide rollers. The operation bridge travels along the rails to transport the fuel assembly, irradiated object, and reactor components in the pools by using tools. Hoists are installed at the top girder. The hoist is suspended from the monorail by means of a motor driven trolley that runs along the monorail. Movements of hoist and trolley are controlled by using the control pendant switch. Processes of design and construction of the operation bridge for the research reactor are introduced. The operation bridge is designed under consideration of functions of handling equipment in the pool and operational limits for safety. Structural analysis is carried out to evaluate the structural integrity in the seismic events. Tests and inspections are also performed during fabrication and installation to confirm the function and safety of the operation bridge

  10. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1984-12-01

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization

  11. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  12. Tendencies in operating power reactors

    International Nuclear Information System (INIS)

    Brinckmann, H.F.

    1987-01-01

    A survey is given about new tendencies in operating power reactors. In order to meet the high demands for control and monitoring of power reactors modern procedures are applicated such as the incore-neutron flux detection by means of electron emission detectors and multi-component activation probes, the noise diagnostics as well as high-efficient automation systems

  13. Safe operation of critical assemblies and research reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-09-15

    Some countries have accumulated considerable experience in the operation of these reactors and have in the process developed safe practices. On the other hand, other countries which have recently acquired, or will soon acquire, such reactors do not have sufficient background of experience with them to have developed full knowledge regarding their safe operation. In this situation, the International Atomic Energy Agency has considered that it would be useful to make available to all its Member States a set of recommendations on the safe operation of these reactors, based on the accumulated experience and best practices. The Director General accordingly nominated a Pane Ion Safe Operation of Critical Assemblies and Research Reactors to assist the Agency's Secretariat in drafting such recommendations

  14. Operational Safety Performance Indicators and Balanced Scorecard in HANARO

    International Nuclear Information System (INIS)

    Wu, Jong-Sup; Jung, Hoan-Sung; Ahn, Guk-Hoon; Lee, Kye-Hong; Lim, In-Cheol; Kim, Hark-Rho

    2007-01-01

    Research reactors need an extensive basis for ensuring their safety. The importance of a safety management in nuclear facilities and activities has been emphasized. The safety activities in HANARO have been continuously conducted to enhance its safe operation. Last year, HANARO prepared two indicator sets to measure and assess the safety status of the reactor's operation and utilization. One is Safety Performance Indicators (SPI) and the other is Balanced Scorecard (BSC). Through reviewing these indicators, we can obtain the following information; - Plant safety status - Safety parameter trends - Safety information, for example, reactor operation status and radiation safety HANARO will continuously pursue the trends of SPI and BSC

  15. Method for operating nuclear reactor

    International Nuclear Information System (INIS)

    Utamura, Motoaki; Urata, Megumu; Uchida, Shunsuke

    1978-01-01

    Purpose: In order to judge the fuel failures, if any, without opening a reactor container for BWR type reactors, a method has been described for measuring the difference between the temperature dependent iodine spike value and the pressure dependent iodine spike value in the pressure vessel. Method: After the scram of a nuclear reactor, steam generated by decay heat is condensed in a remaining heat exchanger and cooling water is returned through a recycling pipe line to a reactor core. At the same time, a control rod drive system pump is operated, the reactor core is filled with the cooling water. Then, the coolant is taken from the recycling pipe line to cool the reactor core. After applying the temperature fluctuation, the cooling water is sampled at a predetermined time interval at a sampling point to determine the changes with time in the radioactive concentration of iodine. When the radioactivity of iodine in the cooling water is lowered sufficiently by a reactor purifying system, the nuclear reactor vessel is depressurized. After applying pressure fluctuation, iodine spike value is determined. (Kawakami, Y.)

  16. Simulation for Remote Operation for REX10 Nuclear Reactor

    International Nuclear Information System (INIS)

    Lee, Sim Won; Kim, Dong Su; Na, Man Gyun; Lee, Yoon Joon; Lee, Yeon Gun; Park, Goon Cherl

    2010-01-01

    The newly designed REX10 (Regional Energy Reactor, 10MWth) is an environmentally-friendly and stable small nuclear reactor for a small-scale reactor based Multi-purpose regional energy system. The REX10 has been developed to maintain system safety in order to be placed in densely populated region, island, etc. In addition, it is significantly hard to recruit many operation and maintenance personnel for small power reactors differently from usual commercial reactors because of its remote location and of economic reasons. In order to overcome these constraints, to decrease the operation cost by reducing operation and maintenance personnel, and to increase plant reliability through autonomous plant control, it is needed to design the control system of the small power reactors and to establish its unmanned remote operation system. In this study, the REX10 reactor core thermal power controller is designed by using a REX10 code analyzer. The remote control facility through man-machine interface (MMI) design and interface between programming languages was established and it was used to verify remote operation of REX10

  17. Cooling Performance Analysis of ThePrimary Cooling System ReactorTRIGA-2000Bandung

    Science.gov (United States)

    Irianto, I. D.; Dibyo, S.; Bakhri, S.; Sunaryo, G. R.

    2018-02-01

    The conversion of reactor fuel type will affect the heat transfer process resulting from the reactor core to the cooling system. This conversion resulted in changes to the cooling system performance and parameters of operation and design of key components of the reactor coolant system, especially the primary cooling system. The calculation of the operating parameters of the primary cooling system of the reactor TRIGA 2000 Bandung is done using ChemCad Package 6.1.4. The calculation of the operating parameters of the cooling system is based on mass and energy balance in each coolant flow path and unit components. Output calculation is the temperature, pressure and flow rate of the coolant used in the cooling process. The results of a simulation of the performance of the primary cooling system indicate that if the primary cooling system operates with a single pump or coolant mass flow rate of 60 kg/s, it will obtain the reactor inlet and outlet temperature respectively 32.2 °C and 40.2 °C. But if it operates with two pumps with a capacity of 75% or coolant mass flow rate of 90 kg/s, the obtained reactor inlet, and outlet temperature respectively 32.9 °C and 38.2 °C. Both models are qualified as a primary coolant for the primary coolant temperature is still below the permitted limit is 49.0 °C.

  18. From USA operation experience of industrial uranium-graphite reactors

    International Nuclear Information System (INIS)

    Burdakov, N.S.

    1996-01-01

    The review on materials, presented by a group of the USA specialists at the seminar in Moscow on October 9-11, 1995 is considered. The above specialists shared their experience in operation of the Hanford industrial reactors, aimed at plutonium production for atomic bombs. The purpose of the above visit consisted in providing assistance to the Russian specialists by evaluation and modernization of operational conditions safety improvement of the RBMK type reactors. Special attention is paid to the behaviour of the graphite lining and channel tubes with an account of possible channel power interaction with the reactor structural units. The information on the experience of the Hanford reactor operation may be useful for specialists, operating the RBMK type reactors

  19. Small reactor operating mode

    International Nuclear Information System (INIS)

    Snell, V.G.

    1997-01-01

    There is a potential need for small reactors in the future for applications such as district heating, electricity production at remote sites, and desalination. Nuclear power can provide these at low cost and with insignificant pollution. The economies required by the small scale application, and/or the remote location, require a review of the size and location of the operating staff. Current concepts range all the way from reactors which are fully automatic, and need no local attention for days or weeks, to those with reduced local staff. In general the less dependent a reactor is on local human intervention, the greater its dependence on intrinsic safety features such as passive decay heat removal, low-stored energy and limited reactivity speed and depth in the control systems. A case study of the design and licensing of the SLOWPOKE Energy System heating reactor is presented. (author)

  20. Operation characteristics and conditions of training reactor VR-1

    International Nuclear Information System (INIS)

    Matejka, K.; Kolros, A.; Polach, S.; Sklenka, L.

    1994-01-01

    The first 3 years of operation of the VR-1 training reactor are reviewed. This period includes its physical start-up (preparation, implementation, results) and operation development as far as the current operating configuration of the reactor core. The physical start-up was commenced using a reactor core referred to as AZ A1, whose physical parameters had been verified by calculation and whose configuration was based on data tested experimentally on the SR-0 reactor at Vochov. The next operating core, labelled AZ A2, was already prepared during the test operation of the VR-1 reactor. Its configuration was such that both of the main horizontal channels, radial and tangential, could be employed. The configuration that followed, AZ A3, was an intermediate step before testing the graphite side reflector. The current reactor core, labelled AZ A3 G, was obtained by supplementing the previous core with a one-sided graphite side reflector. (Z.S.). 2 tabs., 11 figs., 2 refs

  1. Operating manual for the Health Physics Research Reactor

    International Nuclear Information System (INIS)

    1985-11-01

    This manual is intended to serve as a guide in the operation and maintenance of the Health Physics Researh Reactor (HPRR) of the Health Physics Dosimetry Applications Research (DOSAR) Facility. It includes descriptions of the HPRR and of associated equipment such as the reactor positioning devises and the derrick. Procedures for routine operation of the HPRR are given in detail, and checklists for the various steps are provided where applicable. Emergency procedures are similarly covered, and maintenance schedules are outlined. Also, a bibliography of references giving more detailed information on the DOSAR Facility is included. Changes to this manual will be approved by at least two of the following senior staff members: (1) the Operations Division Director, (2) the Reactor Operations Department Head, (3) the Supervisor of Reactor Operations TSF-HPRR Areas. The master copy and the copy of the manual issued to the HPRR Operations Supervisor will always reflect the latest revision. 22 figs

  2. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  3. Reactor operation method

    International Nuclear Information System (INIS)

    Suzuki, Toshio; Hida, Kazuki; Yoshioka, Ritsuo.

    1990-01-01

    The enrichment degree of fuels initially loaded in a reactor core was made extremely lower than that of fresh fuels to be loaded in the succeeding cycle, or the enrichment degree for all of the initially loaded fuels was made identical with that of the fresh fuels in the conventional reactor operation method. In this operation method, since the initially loaded fuels are sometimes taken out after the completion of the cycle at the low burnup degree as it is, it can not be said to reduce the fuel cycle cost. As a means for dissolving this problem, at least two different kinds of initially loaded fuels are prepared. The enrichment degree of the highly enriched fuels is made identical with that of the fresh fuels, and the enrichment degree and the number of low enriched fuels are not changed after the completion of the first cycle but they are operated till the end of the second cycle. Further, all of the fuels at the low enrichment degree are taken out after the completion of the second cycle and exchanged with the fresh fuels. As a result, high burnup ratio of the initially loaded fuels can be increased, to improve the fuel economy. (I.S.)

  4. Operating manual for the Bulk Shielding Reactor

    International Nuclear Information System (INIS)

    1983-04-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR

  5. Operating manual for the Bulk Shielding Reactor

    International Nuclear Information System (INIS)

    1987-03-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR

  6. Operating manual for the Bulk Shielding Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR.

  7. Operating manual for the Bulk Shielding Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1983-04-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR.

  8. Advanced operational strategy for the IRIS reactor: Load follow through mechanical shim (MSHIM)

    International Nuclear Information System (INIS)

    Franceschini, Fausto; Petrovic, Bojan

    2008-01-01

    The renaissance of nuclear power brings more attention to advanced reactor designs and their improved performance and flexibility, including their enhanced load follow capability. Reactor control strategy used to perform transients including power changes has impact on the overall control system design. In particular, as the power change is performed within a load follow maneuver, several modifications occur in the core from a neutronic view point: the fuel and moderator temperature change, the xenon concentration and distribution are modified, the power distribution skewed axially, etc. These changes need to be adequately counterbalanced to keep both the core critical and the power distribution acceptable. The traditional approach in PWRs is to compensate for the reactivity change due to the power variation by adjusting the soluble boron concentration and moving a limited number of control rod banks. However, advanced reactors may adopt a different strategy for a variety of reasons. For example, water-cooled reactors that do not use soluble boron in coolant obviously cannot use its adjustment for this purpose. Moreover, Integral Primary System Reactors (IPSRs) using soluble boron, due to their integral design, have a large inventory of primary coolant. Therefore dilution/boration strategy, while in principle an option, becomes expensive for short time changes and leads to large volume of liquid effluent, in particular toward the end of cycle. Therefore, a capability to perform load follow without changing soluble boron concentration is very desirable for a range of reactor designs. International Reactor Innovative and Secure (IRIS) is an advanced medium-size IPSR that has been selected as the reference reactor for the purpose of this study. A capability to perform load follow maneuvers without changing soluble boron concentration has been examined and demonstrated through implementation of the Westinghouse Mechanical Shim (MSHIM) control strategy. A control bank

  9. Artificial intelligence in nuclear reactor operation

    International Nuclear Information System (INIS)

    Da Ruan; Benitez-Read, J.S.

    2005-01-01

    Assessment of four real fuzzy control applications at the MIT research reactor in the US, the FUGEN heavy water reactor in Japan, the BR1 research reactor in Belgium, and a TRIGA Mark III reactor in Mexico will be examined through a SWOT analysis (strengths, weakness, opportunities, and threats). Special attention will be paid to the current cooperation between the Belgian Nuclear Research Centre (SCK·CEN) and the Mexican Nuclear Centre (ININ) on AI-based intelligent control for nuclear reactor operation under the partial support of the National Council for Science and Technology of Mexico (CONACYT). (authors)

  10. Fuel failure detection in operating reactors

    International Nuclear Information System (INIS)

    Seigel, B.; Hagen, H.H.

    1977-12-01

    Activity detectors in commercial BWRs and PWRs are examined to determine their capability to detect a small number of fuel rod failures during reactor operation. The off-gas system radiation monitor in a BWR and the letdown line radiation monitor in a PWR are calculated to have this capability, and events are cited that support this analysis. Other common detectors are found to be insensitive to small numbers of fuel failures. While adequate detectors exist for normal and transient operation, those detectors would not perform rapidly enough to be useful during accidents; in most accidents, however, primary system sensors (pressure, temperature, level) would provide adequate warning. Advanced methods of fuel failure detection are mentioned

  11. Manual for the operation of research reactors

    International Nuclear Information System (INIS)

    1965-01-01

    The great majority of the research reactors in newly established centres are light-water cooled and are often also light-water moderated. Consequently, the IAEA has decided to publish in its Technical Reports Series a manual dealing with the technical and practical problems associated with the safe and efficient operation of this type of reactor. Even though this manual is limited to light-water reactors in its direct application and presents the practices and experience at one specific reactor centre, it may also be useful for other reactor types because of the general relevance of the problems discussed and the long experience upon which it is based. It has, naturally, no regulatory character but it is hoped that it will be found helpful by staff occupied in all phases of the practical operation of research reactors, and also by those responsible for planning their experimental use. 23 refs, tabs

  12. Safety of research reactors (Design and Operation)

    International Nuclear Information System (INIS)

    Dirar, H. M.

    2012-06-01

    The primary objective of this thesis is to conduct a comprehensive up-to-date literature review on the current status of safety of research reactor both in design and operation providing the future trends in safety of research reactors. Data and technical information of variety selected historical research reactors were thoroughly reviewed and evaluated, furthermore illustrations of the material of fuel, control rods, shielding, moderators and coolants used were discussed. Insight study of some historical research reactors was carried with considering sample cases such as Chicago Pile-1, F-1 reactor, Chalk River Laboratories,. The National Research Experimental Reactor and others. The current status of research reactors and their geographical distribution, reactor category and utilization is also covered. Examples of some recent advanced reactors were studied like safety barriers of HANARO of Korea including safety doors of the hall and building entrance and finger print identification which prevent the reactor from sabotage. On the basis of the results of this research, it is apparent that a high quality of safety of nuclear reactors can be attained by achieving enough robust construction, designing components of high levels of efficiency, replacing the compounds of the reactor in order to avoid corrosion and degradation with age, coupled with experienced scientists and technical staffs to operate nuclear research facilities.(Author)

  13. High-intensity power-resolved radiation imaging of an operational nuclear reactor.

    Science.gov (United States)

    Beaumont, Jonathan S; Mellor, Matthew P; Villa, Mario; Joyce, Malcolm J

    2015-10-09

    Knowledge of the neutron distribution in a nuclear reactor is necessary to ensure the safe and efficient burnup of reactor fuel. Currently these measurements are performed by in-core systems in what are extremely hostile environments and in most reactor accident scenarios it is likely that these systems would be damaged. Here we present a compact and portable radiation imaging system with the ability to image high-intensity fast-neutron and gamma-ray fields simultaneously. This system has been deployed to image radiation fields emitted during the operation of a TRIGA test reactor allowing a spatial visualization of the internal reactor conditions to be obtained. The imaged flux in each case is found to scale linearly with reactor power indicating that this method may be used for power-resolved reactor monitoring and for the assay of ongoing nuclear criticalities in damaged nuclear reactors.

  14. Long-term effects of operating temperature and sulphate addition on the methanogenic community structure of anaerobic hybrid reactors.

    Science.gov (United States)

    Pender, Seán; Toomey, Margaret; Carton, Micheál; Eardly, Dónal; Patching, John W; Colleran, Emer; O'Flaherty, Vincent

    2004-02-01

    The diversity, population dynamics, and activity profiles of methanogens in anaerobic granular sludges from two anaerobic hybrid reactors treating a molasses wastewater both mesophilically (37 degrees C) and thermophilically (55 degrees C) during a 1081 day trial were determined. The influent to one of the reactors was supplemented with sulphate, after an acclimation period of 112 days, to determine the effect of competition with sulphate-reducing bacteria on the methanogenic community structure. Sludge samples were removed from the reactors at intervals throughout the operational period and examined by amplified ribosomal DNA (rDNA) restriction analysis (ARDRA) and partial sequencing of 16S rRNA genes. In total, 18 operational taxonomic units (OTUs) were identified, 12 of which were sequenced. The methanogenic communities in both reactors changed during the operational period. The seed sludge and the reactor biomass sampled during mesophilic operation, both in the presence and absence of sulphate, was characterised by a predominance of Methanosaeta spp. Following temperature elevation, the dominant methanogenic sequences detected in the non-sulphate supplemented reactor were closely related to Methanocorpusculum parvum. By contrast, the dominant OTUs detected in the sulphate-supplemented reactor upon temperature increase were related to the hydrogen-utilising methanogen, Methanobacterium thermoautotrophicum. The observed methanogenic community structure in the reactors correlated with the operational performance of the reactors during the trial and with physiological measurements of the reactor biomass. Both reactors achieved chemical oxygen demand (COD) removal efficiencies of over 90% during mesophilic operation, with or without sulphate supplementation. During thermophilic operation, the presence of sulphate resulted in decreased reactor performance (effluent acetate concentrations of >3000 mg/l and biogas methane content of acetate at 55 degrees C was

  15. RA reactor operation and maintenance in 1994, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1994-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  16. RA research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1985

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1985-01-01

    According to the plan, RA reactor was to be in operation in mid September 1985. But, since the building of the emergency cooling system, nor the reconstruction of the existing special ventilation system were not finished until the end of August reactor was not operated during 1985. During the previous four years reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care, which was cancelled in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981-1984. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks have started: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. IAEA has approved the amount of 1,300,000 US dollars for the renewal of the instrumentation [sr

  17. Development of advanced automatic control system for nuclear ship. 2. Perfect automatic operation after reactor scram events

    International Nuclear Information System (INIS)

    Yabuuchi, Noriaki; Nakazawa, Toshio; Takahashi, Hiroki; Shimazaki, Junya; Hoshi, Tsutao

    1997-11-01

    An automatic operation system has been developed for the purpose of realizing a perfect automatic plant operation after reactor scram events. The goal of the automatic operation after a reactor scram event is to bring the reactor hot stand-by condition automatically. The basic functions of this system are as follows; to monitor actions of the equipments of safety actions after a reactor scram, to control necessary control equipments to bring a reactor to a hot stand-by condition automatically, and to energize a decay heat removal system. The performance evaluation on this system was carried out by comparing the results using to Nuclear Ship Engineering Simulation System (NESSY) and the those measured in the scram test of the nuclear ship 'Mutsu'. As the result, it was showed that this system had the sufficient performance to bring a reactor to a hot syand-by condition quickly and safety. (author)

  18. Development of advanced automatic control system for nuclear ship. 2. Perfect automatic operation after reactor scram events

    Energy Technology Data Exchange (ETDEWEB)

    Yabuuchi, Noriaki; Nakazawa, Toshio; Takahashi, Hiroki; Shimazaki, Junya; Hoshi, Tsutao [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1997-11-01

    An automatic operation system has been developed for the purpose of realizing a perfect automatic plant operation after reactor scram events. The goal of the automatic operation after a reactor scram event is to bring the reactor hot stand-by condition automatically. The basic functions of this system are as follows; to monitor actions of the equipments of safety actions after a reactor scram, to control necessary control equipments to bring a reactor to a hot stand-by condition automatically, and to energize a decay heat removal system. The performance evaluation on this system was carried out by comparing the results using to Nuclear Ship Engineering Simulation System (NESSY) and the those measured in the scram test of the nuclear ship `Mutsu`. As the result, it was showed that this system had the sufficient performance to bring a reactor to a hot syand-by condition quickly and safety. (author)

  19. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  20. Thermal-structural response of EBR-II major components under reactor operational transients

    International Nuclear Information System (INIS)

    Chang, L.K.; Lee, M.J.

    1983-01-01

    Until recently, the LMFBR safety research has been focused primarily on severe but highly unlikely accident, such as hypothetical-core-disruptive accidents (HCDA's), and not enough attention has been given to accident prevention, which is less severe but more likely sequence. The objective of the EBR-II operational reliability testing (ORT) is to demonstrate that the reactor can be designed and operated to prevent accident. A series of mild duty cycles and overpower transients were designed for accident prevention tests. An assessment of the EBR-II major plant components has been performed to assure structural integrity of the reactor plant for the ORT program. In this paper, the thermal-structural response and structural evaluation of the reactor vessel, the reactor-vessel cover, the intermediate heat exchanger (IHX) and the superheater are presented

  1. Supervisory and managerial aspects on the safe operation of the Egyptian second research reactor

    International Nuclear Information System (INIS)

    Abdelrazek, I.D.; Shokr, A.M.

    2000-01-01

    ETRR-2 is a multipurpose reactor for radioisotopes production, neutron beam experiments, basic and applied research in physics and engineering, fuels and material tests, and for training. The reactor is an open pool type, 22 MW power, with average thermal neutron flux of 1.4x10 14 n/cm 2 sec, cooled and moderated by light water and with beryllium reflectors. Various experimental devices and irradiation facilities are integrated with the reactor. The reactor has been licensed for operation in November 1998. Several principles and regulations have been applied to all the reactor project stages to achieve safety. Moreover, other several principals, regulations, and aspects are enforced by the AEA, National Center for Nuclear Safety and Radiation Control, NCNSRC, and reactor management to achieve safety during reactor operation and utilization. Responsibility on Safety and Supervision Aspects AEA chairman has the ultimate responsibility on the reactor safety during operation and utilization. The primary responsible on the safety is the ETRR-2 supervisor, who is supervising the ETRR-2 site that includes the ETRR-2 reactor, Fuel Manufacturing Plant, and other two projects (under execution): Radioisotopes Production Plant and Dry Fuel Storage Facility. ETRR-2 supervisor is responsible to ensure that: the reactor is operated in accordance with the safety requirements by qualified and trained personnel, updating and enforcement of the reactor mandatory documentation, and the services are adequate for the reactor operation. He is responsible, also, to guarantee that: the reactor manager has enough authority and resources to carry out his function effectively and the reactor is kept operated in agreement with established procedures. A Technical Revision Committee, TRC, is formed to advice the ETRR-2 supervisor on the safety of the reactor and experiments. The committee members are from AEA experts with no direct relation to the reactor and experiments being performed. Members

  2. Operating experiences since rise-to-power test in high temperature engineering test reactor (HTTR)

    International Nuclear Information System (INIS)

    Tochio, Daisuke; Watanabe, Shuji; Motegi, Toshihiro; Kawano, Shuichi; Kameyama, Yasuhiko; Sekita, Kenji; Kawasaki, Kozo

    2007-03-01

    The rise-to-power test of the High Temperature Engineering Test Reactor (HTTR) was actually started in April 2000. The rated thermal power of 30MW and the rated reactor outlet coolant temperature of 850degC were achieved in the middle of Dec. 2001. After that, the reactor thermal power of 30MW and the reactor outlet coolant temperature of 950degC were achieved in the final rise-to-power test in April 2004. After receiving the operation licensing at 850degC, the safety demonstration tests have conducted to demonstrate inherent safety features of the HTGRs as well as to obtain the core and plant transient data for validation of safety analysis codes and for establishment of safety design and evaluation technologies. This paper summarizes the HTTR operating experiences for six years from start of the rise-to-power test that are categorized into (1) Operating experiences related to advanced gas-cooled reactor design, (2) Operating experiences for improvement of the performance, (3) Operating experiences due to fail of system and components. (author)

  3. Operation and utilization of Indonesia Research Reactors

    International Nuclear Information System (INIS)

    Kuntoro, Iman; Sujalmo, Saiful; Tarigan, Alim

    2004-01-01

    For supporting the R and D in nuclear science and technology and its application, BATAN own and operate three research reactors namely, TRIGA-2000, KARTINI and RSG-GAS having thermal power of 2 MW, 100 kW and 30 MW respectively. The main features, operation and utilization progress of the reactors are described in this report. (author)

  4. Operating reactors licensing actions summary. Vol. 3, No. 6

    International Nuclear Information System (INIS)

    1983-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  5. Operating reactors licensing actions summary. Volume 5, No. 6

    International Nuclear Information System (INIS)

    1985-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published for internal NRC use in managing the Operating Reactors Licensing Actions Program. Its content will change based on NRC management informational requirements

  6. Optimizing the design and operation of reactor emergency systems using reliability analysis techniques

    International Nuclear Information System (INIS)

    Snaith, E.R.

    1975-01-01

    Following a reactor trip various reactor emergency systems, e.g. essential power supplies, emergency core cooling and boiler feed water arrangements are required to operate with a high degree of reliability. These systems must therefore be critically assessed to confirm their capability of operation and determine their reliability of performance. The use of probability analysis techniques enables the potential operating reliability of the systems to be calculated and this can then be compared with the overall reliability requirements. However, a system reliability analysis does much more than calculate an overall reliability value for the system. It establishes the reliability of all parts of the system and thus identifies the most sensitive areas of unreliability. This indicates the areas where any required improvements should be made and enables the overall systems' designs and modes of operation to be optimized, to meet the system and hence the overall reactor safety criteria. This paper gives specific examples of sensitive areas of unreliability that were identified as a result of a reliability analysis that was carried out on a reactor emergency core cooling system. Details are given of modifications to design and operation that were implemented with a resulting improvement in reliability of various reactor sub-systems. The report concludes that an initial calculation of system reliability should represent only the beginning of continuing process of system assessment. Data on equipment and system performance, particularly in those areas shown to be sensitive in their effect on the overall nuclear power plant reliability, should be collected and processed to give reliability data. These data should then be applied in further probabilistic analyses and the results correlated with the original analysis. This will demonstrate whether the required and the originally predicted system reliability is likely to be achieved, in the light of the actual history to date of

  7. DETAILS OF OPERATIONS PERFORMED BY THE REMOTE CONTROL ROBOT (CONCEPT TO THE HORIZONTAL FUEL CHANNEL DURING DECOMMISSIONING PHASE OF NUCLEAR REACTOR CALANDRIA STRUCTURE. PART II: INSIDE OPERATIONS

    Directory of Open Access Journals (Sweden)

    Constantin POPESCU

    2017-05-01

    Full Text Available The authors contribution to this paper is to present a concept solution of a remote control robot (RCR used for decommissioning of the horizontal fuel channels pressure tube in the CANDU nuclear reactor. In this paper the authors highlight few details of geometry, operations, constraints by kinematics and dynamics of the robot movement inside of the reactor fuel channel. Inside operations performed has as the main steps of dismantling process the followings: unblock and extract the channel closure plug (from End Fitting - EF, unblock and extract the channel shield plug (from Lattice Tube - LT, cut the ends of the pressure tube, extract the pressure tube and cut it in small parts, sorting and storage extracted items in the safe robot container. All steps are performed in automatic mode. The remote control robot (RCR represents a safety system controlled by sensors and has the capability to analyze any error registered and decide next activities or abort the inside decommissioning procedure in case of any risk rise in order to ensure the environmental and workers protection.

  8. New technologies for acceleration and vibration measurements inside operating nuclear power reactors

    International Nuclear Information System (INIS)

    Runkel, J.; Stegemann, D.; Fiedler, J.; Heidemann, P.; Blaser, R.; Schmid, F.; Trobitz, M.; Hirsch, L.; Thoma, K.

    2000-01-01

    A miniature bi-axial in-core accelerometer has been inserted temporarily inside the travelling in-core probe (TIP) systems of operating 1300 MW el boiling water reactors (BWR) during full power operation. In-core acceleration measurements can be performed in any position of the TIP system. This provides new features of control technologies to preserve the integrity of reactor internals. The radial and axial position where fretting or impacting of instrumentation string tubes or other structures might occur can be localised inside the reactor pressure vessel. The efficiency and long-term performance of subsequent improvements of the mechanical or operating conditions can be controlled with high local resolution and sensitivity. Low frequency vibrations of the instrumentation tubes were measured inside the core. Neutron-mechanical scale factors were determined from neutron noise, measured by the standard in-core neutron instrumentation and from displacements of the TIP tubes, calculated by integration of the measured in-core acceleration signals. The scale factors contribute to qualitative and quantitative monitoring of BWR internals' vibrations only by the use of neutron signals. (authors)

  9. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex A - Reactor applications

    International Nuclear Information System (INIS)

    Martinc, R.; Stanic, A.

    1985-01-01

    This document describes reactor operation from 1981 to 1985, including data about short term (shorter than 24 hours) and long term operation interruptions, as well as safety shutdown and reactor applications. During 1982, 1983 until July 1984 reactor was operated at 2 MW power according to the plan. Plan was not fulfilled in 1983 because deposits were noticed again, at the end of 1982, on the surface of fuel elements. Reactor was mainly used for neutron activation purposes and isotope production as source of neutrons for experimental purposes [sr

  10. The development of reactor operator license examination question bank

    International Nuclear Information System (INIS)

    Kim, In Hwan; Woo, S. M.; Kam, S. C.; Nam, K. J.; Lim, H. P.

    2001-12-01

    The number of NPP keeps increasing therefore there is more need of reactor operators. This trend requires the more efficiency in managing the license examination. Question bank system will help us to develop good quality examination materials and keep them in it. The ultimate purpose of the bank system is for selecting qualified reactor operators who are primarily responsible for the safety of reactor operation in NPP

  11. Control rod for the operation of nuclear reactor

    International Nuclear Information System (INIS)

    Ishida, Hiromi

    1987-01-01

    Purpose: To conduct spectrum shift operation without complicating the reactor core structures, reducing the probability of failures. Constitution: An operation control rod which is driven while passed vertically in the reactor core comprises a strong absorption portion, moderation portion and weak moderation portion defined orderly from above to below and the length for each of the portions is greater than the effective reactor core height. If the operation control rod is lifted to the maximum limit in the upward direction of the reactor core, the weak moderation portion is corresponded over the effective length of the reactor core. Since the weak moderation portion is filled with zirconium and moderators are not present in the operation control rod, water draining gap is formed, neutron spectral shift is formed, excess reactivity is suppressed, absorption of neutrons to fuel fertile material is increased and the formation of nuclear fission material is increased. From the middle to the final stage of the cycle, the control rod is lowered, by which the moderator/fuel effective volume ratio is increased to increase the reactivity. (Kamimura, M.)

  12. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1990-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. During 1989 the operators service staff participated in the following activities: reconstruction of the existing reactor systems, control of the emergency cooling system, construction of the experimental loop 'Vinca-1'. Education of the staff was organized through routine courses, practical training is foreseen for 1991 [sr

  13. Performance of nuclear fuel in the Krsko reactor; Spremljanje delovanja jedrskega goriva v reaktorju NE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Jurcevic, M; Kurincic, B; Levstek, M F; Sambo, B; Vrcko, P [Nuklearna elektrana Krsko, Krsko (Yugoslavia)

    1987-07-01

    In this paper activities to follow performance of the nuclear fuel and operational status of the reactor of Nuclear Power Plant Krsko are presented. Short descriptions of the methods as well as nuclear and process instrumentation used for surveillance of the reactor performance are given. The purpose of the subject activities is to assure safe operation of the reactor in accordance with the Final safety Analysis Report of NPP Krsko. (author)

  14. Real time monitoring system of the operation variables of the TRIGA IPR-R1 nuclear research reactor

    International Nuclear Information System (INIS)

    Ricardo, Carla Pereira; Mesquita, Amir Zacarias

    2007-01-01

    During the last two years all the operation parameters of the TRIGA IPR-R1 were monitored and real time indicated bu the data acquisition system developed for the reactor. All the information were stored on a rigid disk, at the collection system computer, leaving the information on the reactor performance and behaviour available for consultation in a chronological order. The data acquisition program has been updated and new reactor operation parameters were included for increasing the investigation and experiments possibilities. The register of reactor operation variables are important for the immediate or subsequent safety analyses for reporting the reactor operations to the external organizations. This data acquisition satisfy the IAEA recommendations. (author)

  15. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  16. Operation monitoring and protection method for nuclear reactor

    International Nuclear Information System (INIS)

    Tochihara, Hiroshi.

    1995-01-01

    In an operation and monitoring method for a PWR-type reactor by using a tetra-sected neutron detector, axial off set is defined by neutron detector signals with respect to an average of the reactor core, the upper half of the reactor core, and the lower half of the reactor core. A departure from nucleate boiling (DNBR) is represented by standardized signals, and the DNBR is calculated by using the axial off set of the average of the reactor core, the upper half of the reactor core, and the lower half of the reactor core, and they are graphically displayed. In addition, a thermal flow rate-water channel coefficient is also graphically displayed, and the DNBR and the thermal flow rate-water channel coefficient are restricted based on the display, to determine an allowable operation range. As a result, it is possible to provide an operation monitoring and protection method for nuclear reactor capable of reducing labors and frequencies for the change of protection system setting in a case of using a tetra-sected neutron detector disposed at the outside and, at the same time, protecting each of DNR and the highest linear power or the thermal water coefficient channel. (N.H.)

  17. Performance confirmation operation of water environment control facility

    International Nuclear Information System (INIS)

    Magome, Hirokatsu; Okada, Yuji; Tomita, Kenji; Iida, Kazuhiro; Ando, Hitoshi; Yonekawa, Akihisa; Ueda, Haruyasu; Hanawa, Hiroshi; Kanno, Masaru; Sakuta, Yoshiyuki

    2015-09-01

    In Japan Atomic Energy Agency, in order to solve the problem in the long-term operation of a light water reactor, preparation which does the irradiation experiment of light-water reactor fuel and material was advanced. JMTR stopped after the 165th operation cycle in August 2006, and is advancing renewal of the irradiation facility towards re-operation. The material irradiation test facility was installed from 2008 fiscal year to 2012 fiscal year in JMTR. The material irradiation test facility is used for IASCC study, and consists of mainly three equipments. This report described performance operating test of the water environmental control facilities for IASCC study carried out 2013 fiscal year. (author)

  18. Ensuring the operational safety of nuclear power plants with WWER reactors

    International Nuclear Information System (INIS)

    Shasharin, G.A.; Veretennikov, G.A.; Abagyan, A.A.; Lesnoj, S.A.

    1984-01-01

    At the start of 1983, 27 nuclear power producing units with reactor facilities of the WWER type were in operation in the Soviet Union and other countries. In 1982 the average load factor for nuclear power plants with WWER reactors was 73 per cent. There was not a single nuclear accident or even damage with any significant radiation consequences in the WWER reactors during the entire period of their operation. The most modern nuclear power plants with WWER-440 and WWER-1000 reactors meet all present-day international requirements. Safe operation of the plants is achieved by a variety of measures, the most important of which include: procedures for increasing the reliability of plant equipment and systems; ensuring exact compliance with plant operating instructions; ensuring reliable operation of plant safety systems; action directed towards maintaining the skills of plant personnel at a level adequate to ensure the taking of proper action during transient processes and accident situations. The paper discusses concrete steps for ensuring safe nuclear power plant operation along these lines. In particular, measures such as the following are described: the use of a system for collecting and processing information on equipment failures and defects; the development and introduction of methods of early defect diagnosis; the performance of complex testing of safety systems; the training of highly skilled personnel for nuclear power plants at educational combines and at teaching and training centres making use of simulators; arranging accident-prevention training and special instruction for personnel. (author)

  19. 78 FR 71675 - Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence

    Science.gov (United States)

    2013-11-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0260] Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence The U.S. Nuclear Regulatory Commission (NRC) is issuing this Federal Register notice to inform the public of a slight change in the manner of distribution of publicly available operating reactor licensing...

  20. Effect of beta limits on reactor performance in EBT

    International Nuclear Information System (INIS)

    Uckan, N.A.; Spong, D.A.; Nelson, D.B.

    1981-01-01

    Because of uncertainties in extrapolating results of simplified models to a reactor plasma, the parameters that influence the beta limits cannot be determined accurately at the present time. Also, the reasonable changes within the models and/or assumptions are seen to affect the core beta limits by almost an order of magnitde. Hence, at the present, these limits cannot be used as a rigid (and reliable) requirement for ELMO Bumpy Torus (EBT) reactor engineering considerations. However, sensitivity studies can be carried out to determine the boundaries of the operating regime and to demonstrate the effects of various modes, assumptions, and models on reactor performance (Q value). First, the modes believed to limit the core β and ring plasma performance are discussed, and the simplifications and/or assumptions involved in deriving these limits are highlighted. Then, the implications of these limits for a reactor are given

  1. Reactor performances and microbial communities of biogas reactors: effects of inoculum sources.

    Science.gov (United States)

    Han, Sheng; Liu, Yafeng; Zhang, Shicheng; Luo, Gang

    2016-01-01

    Anaerobic digestion is a very complex process that is mediated by various microorganisms, and the understanding of the microbial community assembly and its corresponding function is critical in order to better control the anaerobic process. The present study investigated the effect of different inocula on the microbial community assembly in biogas reactors treating cellulose with various inocula, and three parallel biogas reactors with the same inoculum were also operated in order to reveal the reproducibility of both microbial communities and functions of the biogas reactors. The results showed that the biogas production, volatile fatty acid (VFA) concentrations, and pH were different for the biogas reactors with different inocula, and different steady-state microbial community patterns were also obtained in different biogas reactors as reflected by Bray-Curtis similarity matrices and taxonomic classification. It indicated that inoculum played an important role in shaping the microbial communities of biogas reactor in the present study, and the microbial community assembly in biogas reactor did not follow the niche-based ecology theory. Furthermore, it was found that the microbial communities and reactor performances of parallel biogas reactors with the same inoculum were different, which could be explained by the neutral-based ecology theory and stochastic factors should played important roles in the microbial community assembly in the biogas reactors. The Bray-Curtis similarity matrices analysis suggested that inoculum affected more on the microbial community assembly compared to stochastic factors, since the samples with different inocula had lower similarity (10-20 %) compared to the samples from the parallel biogas reactors (30 %).

  2. Method of controlling the reactor operation

    International Nuclear Information System (INIS)

    Ishiguro, Akira; Nakakura, Hiroyuki.

    1987-01-01

    Purpose: To moderate vibratory response due to delayed operation thereby obtain stable controlled response in the operation control for a PWR type reactor. Method: the reactor operation is controlled by the axial power distribution control by regulating the boron concentration in primary coolants with a boron density control system and controlling the average temperature for the primary coolants with the control rod control system. In this case, the control operation and the control response become instable due to transmission delay, etc. of aqueous boric acid injection to the primary coolant circuits to result in vibratory response. In the present invention, signals are prepared by adding the amount in proportion to the variation coefficient with time of xenone concentration obtained from the measured value for the reactor power added to the conventional axial power distribution parameter deviation and used as the input signals for the boron concentration control system. As a result, the instability due to the transmission delay of the aqueous boric acid injection is improved by the preceding control by the amount in proportion with the variation coefficient with time of the xenone concentration. An advantageous effect can be expected for the load following operation during day time according to the present invention. (Kamimura, M.)

  3. RA reactor operation and maintenance in 1996, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1996-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. Since the RA reactor is shutdown since 1984, it is high time for decision making of its future status. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown. Control and maintenance of the reactor instrumentation and devices was done regularly but dependent on the availability of the spare parts and financial means. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  4. Evaluation of the revised electrolytic reduction reactor from a remote operability aspect

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Hyo Jik; Yoon, K. H.; Kim, K. H. (and others)

    2008-01-15

    This report presents an evaluation of the remote operability of the revised electrolytic reduction (ER) reactor installed in the ACP at KAERI. All operations have to be implemented in a fully remote manner since the ACPF is a hotcell for handling highly radioactive materials such as spent nuclear fuels. In particular, the ER process is a key process of the Advanced spent fuel Conditioning Process (ACP) and it needs a lot of other auxiliary equipment to perform it. Also, since the ER equipment is too big and complicated, and contrarily the ACPF is not big enough, and one common rail is allotted for a bridge transported servo manipulator, an in-cell crane and a gate crane, a remote handling of the ER reactor is accompanied by a difficulty for a remote operation. For an easy understanding, short overview of the ER process, the remote handling equipment, the structural configuration of the ACPF and the detail drawings of the ER equipment are presented. Through 4 month-remote operational tests, detailed operational procedures are presented along with pictures. The remote handling equipment and tools required in each operation are addressed in detail. Also, the procedure to implement each remote operation, and a task difficulty are evaluated from a remote operability aspect. All the remote tasks are distinguished according to whether a remote operation can be performed or not. Finally, partial improvement or an idea to solve the suggested problems is presented. This report will assist in modifying or scaling up the ER reactor.

  5. Internally Heated Screw Pyrolysis Reactor (IHSPR) heat transfer performance study

    Science.gov (United States)

    Teo, S. H.; Gan, H. L.; Alias, A.; Gan, L. M.

    2018-04-01

    1.5 billion end-of-life tyres (ELT) were discarded globally each year and pyrolysis is considered the best solution to convert the ELT into valuable high energy-density products. Among all pyrolysis technologies, screw reactor is favourable. However, conventional screw reactor risks plugging issue due to its lacklustre heat transfer performance. An internally heated screw pyrolysis reactor (IHSPR) was developed by local renewable energy industry, which serves as the research subject for heat transfer performance study of this particular paper. Zero-load heating test (ZLHT) was first carried out to obtain the operational parameters of the reactor, followed by the one dimensional steady-state heat transfer analysis carried out using SolidWorks Flow Simulation 2016. Experiments with feed rate manipulations and pyrolysis products analyses were conducted last to conclude the study.

  6. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1988-01-01

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  7. Tokamaks with high-performance resistive magnets: advanced test reactors and prospects for commercial applications

    International Nuclear Information System (INIS)

    Bromberg, L.; Cohn, D.R.; Williams, J.E.C.; Becker, H.; Leclaire, R.; Yang, T.

    1981-10-01

    Scoping studies have been made of tokamak reactors with high performance resistive magnets which maximize advantages gained from high field operation and reduced shielding requirements, and minimize resistive power requirements. High field operation can provide very high values of fusion power density and n tau/sub e/ while the resistive power losses can be kept relatively small. Relatively high values of Q' = Fusion Power/Magnet Resistive Power can be obtained. The use of high field also facilitates operation in the DD-DT advanced fuel mode. The general engineering and operational features of machines with high performance magnets are discussed. Illustrative parameters are given for advanced test reactors and for possible commercial reactors. Commercial applications that are discussed are the production of fissile fuel, electricity generation with and without fissioning blankets and synthetic fuel production

  8. RA Research reactor, Annual report 1970 - Operation and maintenance

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1970-12-01

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  9. ITER parametric analysis and operational performance

    International Nuclear Information System (INIS)

    Perkins, L.J.; Spears, W.R.; Galambos, J.D.

    1991-01-01

    One of the key components of the ITER Conceptual Design Activities (CDA) is the determination of optimum design, investigation of operation in various modes, recommendation of baseline performance specifications, studies of sensitivity of ITER design to uncertainties in physics, investigation of operational flexibility, assessment of alternative designs, and determination of implications for extrapolation to prospective DEMO reactors. These terms of reference are reported in this document. Refs, figs and tabs

  10. Operating history of U.S. nuclear power reactors

    International Nuclear Information System (INIS)

    1974-01-01

    The operating history of U. S. nuclear power plants through December 31, 1974 has been collected. Included are those nuclear reactor facilities which produce electricity, even if in token amounts, or which are part of a development program concerned with the generation of electricity through the use of a nuclear reactor as a heat source. The information is based on data furnished by facility operators. The charts are plotted in terms of cumulative thermal energy as a function of time. Since only those shutdowns of five days or more are shown, the charts do not give a detailed history of plant operation. They do, however, give an overview of the operating history of a variety of developmental and experimental nuclear power reactors. The data show the yearly gross generation of electricity for each U. S. nuclear plant and, for civilian power plants, information on reactor availability and plant capacity factor. (U.S.)

  11. Licensed operating reactors

    International Nuclear Information System (INIS)

    1991-08-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  12. Microorganism selection and biosurfactant production in a continuously and periodically operated bioslurry reactor.

    Science.gov (United States)

    Cassidy, D P; Hudak, A J

    2001-06-29

    A continuous-flow reactor (CSTR) and a soil slurry-sequencing batch reactor (SS-SBR) were maintained in 8l vessels for 180 days to treat a soil contaminated with diesel fuel (DF). Concentrations of Candida tropicalis, Brevibacterium casei, Flavobacterium aquatile, Pseudomonas aeruginosa, and Pseudomonas fluorescens were determined using fatty acid methyl ester (FAME) analysis. DF removal (biological and volatile) and biosurfactant concentrations were measured. The SS-SBR encouraged the growth of biosurfactant-producing species relative to the CSTR. Counts of biosurfactant-producing species (C. tropicalis, P. aeruginosa, P. fluorescens) relative to total microbial counts were 88% in the SS-SBR and 23% in the CSTR. Biosurfactants were produced in the SS-SBR to levels of nearly 70 times the critical micelle concentration (CMC) early in the cycle, but were completely degraded by the end of each cycle. No biosurfactant production was observed in the CSTR. DF biodegradation rates were over 40% greater and DF stripping was over five times lower in the SS-SBR than the CSTR. However, considerable foaming occurred in the SS-SBR. Reversing the mode of operation in the reactors on day 80 caused a complete reversal in microbial consortia and reactor performance by day 120. These results show that bioslurry reactor operation can be manipulated to control overall reactor performance.

  13. Sustainability management for operating organizations of research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo; Aquino, Afonso Rodrigues de, E-mail: ekibrit@ipen.br, E-mail: araquino@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNE-SP), Sao Paulo, SP (Brazil)

    2017-07-01

    Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs. In a country like Brazil, where nuclear activity is geared towards peaceful purposes, any operating organization of research reactor should emphasize its commitment to social, environmental, economic and institutional aspects. Social aspects include research and development, production and supply of radiopharmaceuticals, radiation safety and special training for the nuclear sector. Environmental aspects include control of the surroundings and knowledge directed towards environment preservation. Economic aspects include import substitution and diversification of production. Institutional aspects include technology, innovation and knowledge. These aspects, if considered in the management system of an operating organization of research reactor, will help with its long-term maintenance and success in an increasingly competitive market scenario. About this, we propose a sustainability management system approach for operating organizations of research reactors. A bibliographical review on the theme is made. A methodology for identifying indicators for measuring sustainability in nuclear research reactors processes is also described. Finally, we propose a methodology for sustainability perception assessment to be applied at operating organizations of research reactors. (author)

  14. Sustainability management for operating organizations of research reactors

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Aquino, Afonso Rodrigues de

    2017-01-01

    Sustainable development is development that meets the needs of the present without compromising the ability of future generations to meet their own needs. In a country like Brazil, where nuclear activity is geared towards peaceful purposes, any operating organization of research reactor should emphasize its commitment to social, environmental, economic and institutional aspects. Social aspects include research and development, production and supply of radiopharmaceuticals, radiation safety and special training for the nuclear sector. Environmental aspects include control of the surroundings and knowledge directed towards environment preservation. Economic aspects include import substitution and diversification of production. Institutional aspects include technology, innovation and knowledge. These aspects, if considered in the management system of an operating organization of research reactor, will help with its long-term maintenance and success in an increasingly competitive market scenario. About this, we propose a sustainability management system approach for operating organizations of research reactors. A bibliographical review on the theme is made. A methodology for identifying indicators for measuring sustainability in nuclear research reactors processes is also described. Finally, we propose a methodology for sustainability perception assessment to be applied at operating organizations of research reactors. (author)

  15. I and C system at TRIGA - ICN reactor after more than 20 years of operation

    International Nuclear Information System (INIS)

    Ionila, M.; Preda, M.

    2002-01-01

    An I and C system that is involved in a nuclear safety function has to be itself safe in operation, strictly performing the survey of those parameters, which are linked to the safety function. The precision of such a system is sufficient for the safety function, but for a more accurate evaluation of the in-core experimental phenomena, the presence of a data acquisition and processing system is needed. The two systems must be together taken into account by the reactor operation. The data acquisition and processing system designated for the monitoring of the stationary or the slow-varying processes allow the safety function evaluation from the point of view of the statistics of the effective reactor operation time along a certain period of time. The evaluation of the unscheduled reactor shutdowns determined by those reactor systems having safety functions with the percentage contribution of each system is presented. The data were selected from the annual operation reports for the reactor and the reactor installations in the period 1981-1999

  16. Automated surveillance of reactor coolant pump performance

    International Nuclear Information System (INIS)

    Gross, K.C.; Singer, R.M.; Humenik, K.E.

    1992-01-01

    An artificial intelligence based expert system has been developed for continuous surveillance and diagnosis of centrifugal-type reactor coolant pump (RCP) performance and operability. The expert system continuously monitors digitized signals from a variety of physical variables (speed, vibration level, motor power, discharge pressure) associated with RCP performance for annunciation of the incipience or onset of off-normal operation. The system employs an extremely sensitive pattern-recognition technique, the sequential probability ratio test (SPRT) for rapid identification of pump operability degradation. The sequential statistical analysis of the signal noise has been shown to provide the theoretically shortest sampling time to detect disturbances and thus has the potential of providing incipient fault detection information to operators sufficiently early to avoid forced plant shutdowns. The sensitivity and response time of the expert system are analyzed in this paper using monte carlo simulation techniques

  17. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  18. Operational behaviour of a reactor normal operation and disturbances

    International Nuclear Information System (INIS)

    Geyer, K.H.

    1982-01-01

    During normal operation, the following topics are dealt with: primary and secondary coolant circuits - full load operation - start-up and shutdown - steady state part load diagramm. During disturbances and incidents, the following procedures are discussed: identification and detection of the events - automatic actions - manual actions of the operator - provided indications - explanation of actuated systems - basic information of reactor protection system. (RW)

  19. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  20. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  1. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, L.R.; Hayes, D.W.; Hunter, C.H.; Marter, W.L.; Moyer, R.A.

    1989-12-01

    This volume is a reactor operation environmental information document for the Savannah River Plant. Topics include meteorology, surface hydrology, transport, environmental impacts, and radiation effects. 48 figs., 56 tabs. (KD)

  2. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. I

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4-8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  3. Operating Experience with Power Reactors. Proceedings of the Conference on Operating Experience with Power Reactors. Vol. II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-10-15

    At the beginning of 1963 nuclear power plants produced some 3 500 000 kW of electrical power to different distribution grids around the world. Much significant operating experience has been gained with these power reactors, but this experience is often not collected in such a way as to make it easily available. The International Atomic Energy Agency convened a Conference on Operating Experience with Power Reactors in Vienna from 4 -8 June 1963 which was attended by 240 participants representing 27 of the Agency's Member States and six international organizations. At the Conference, 42 papers giving detailed experience with more than 20 nuclear power stations were discussed. Although similar meetings on a national or regional scale have been held earlier in various countries, this is the first arranged by the Agency on a world-wide basis. Some of the detailed material may have been given earlier but for the most part it represents new and recently acquired experience, and for the first time it has been possible to compile in one place such extensive material on the operating experience with power reactors. The Conference discussed the experience gained both generally in the context of national and international nuclear power development programmes, and more specifically in the detailed operating experience with different power reactor stations. In addition, various plant components, fuel cycles, staffing of nuclear plants and licensing of such staff were treated. It is hoped that these Proceedings will be of interest not only to nuclear , plant designers and operators who daily encounter problems similar to those discussed by the Conference, but also to those guiding the planning and implementation of power development programmes.

  4. L-Reactor operation, Savannah River Plant: environmental assessment

    International Nuclear Information System (INIS)

    1982-08-01

    The purpose of this document is to assess the significance of the effects on the human environment of the proposed resumption of L-reactor operation at the Savannah River Plant, scheduled for October 1983. The discussion is presented under the following section headings: need for resumption of L-Reactor operations and purpose of this environmental assessment; proposed action and alternative; affected environment (including, site location and description, land use, historic and archeological resources, socioeconomic and community characteristics, geology and seismology, hydrology, meteorology and climatology, ecology, and radiation environment); environmental consequences; summary of projected L-Reactor releases and impacts; and Federal and State permits and approval. The three appendices are entitled: radiation dose calculation methods and assumptions; floodplain/wetlands assessment - L-Reactor operations; and, conversion table. A list of references is included at the end of each chapter

  5. Small nuclear reactor safety design requirements for autonomous operation

    International Nuclear Information System (INIS)

    Kozier, K.S.; Kupca, S.

    1997-01-01

    Small nuclear power reactors offer compelling safety advantages in terms of the limited consequences that can arise from major accident events and the enhanced ability to use reliable, passive means to eliminate their occurrence by design. Accordingly, for some small reactor designs featuring a high degree of safety autonomy, it may be-possible to delineate a ''safety envelope'' for a given set of reactor circumstances within which safe reactor operation can be guaranteed without outside intervention for time periods of practical significance (i.e., days or weeks). The capability to operate a small reactor without the need for highly skilled technical staff permanently present, but with continuous remote monitoring, would aid the economic case for small reactors, simplify their use in remote regions and enhance safety by limiting the potential for accidents initiated by inappropriate operator action. This paper considers some of the technical design options and issues associated with the use of small power reactors in an autonomous mode for limited periods. The focus is on systems that are suitable for a variety of applications, producing steam for electricity generation, district heating, water desalination and/or marine propulsion. Near-term prospects at low power levels favour the use of pressurized, light-water-cooled reactor designs, among which those having an integral core arrangement appear to offer cost and passive-safety advantages. Small integral pressurized water reactors have been studied in many countries, including the test operation of prototype systems. (author)

  6. Safety evaluation of the Dalat research reactor operation

    International Nuclear Information System (INIS)

    Long, V.H.; Lam, P.V.; An, T.K.

    1989-01-01

    After an introduction presenting the essential characteristics of the Dalat Nuclear Research Reactor, the document presents i) The safety assurance condition of the reactor, ii) Its safety behaviour after 5 years of operation, iii) Safety research being realized on the reactor. Following is questionnaire of safety evaluation and a list of attachments, which concern the reactor

  7. Understanding to requirements for educational level in qualification of reactor operators

    International Nuclear Information System (INIS)

    Zhang Chi; Yang Di; Zhou Limin

    2007-01-01

    Requirements for qualification of reactor operators in nuclear safety regulations were discussed in this paper. The new issue was described in the confirmation of education level of reactor operators. The understanding to the requirements for Educational Level in Qualification of Reactor Operators was provided according to Higher Education Law of the People's Republic of China. It was proposed to improve the confirmation of qualification of reactor operators as soon as possible. (authors)

  8. Effect of Different Operating Temperatures on the Biological Hydrogen Methanation in Trickle Bed Reactors

    Directory of Open Access Journals (Sweden)

    Andreas Lemmer

    2018-05-01

    Full Text Available To improve the reactor efficiency, this study investigated the influence of temperature on the biological hydrogen methanation (BHM in trickle-bed reactors (TBR. Rising temperatures increase the metabolic activity of methanogenic microorganisms, thus leading to higher reactor specific methane formation rates (MFR. In order to quantify the potential for improved performance, experiments with four different operating temperatures ranging from 40 to 55 °C were carried out. Methane content increased from 88.29 ± 2.12 vol % at 40 °C to 94.99 ± 0.81 vol % at 55 °C with a stable biological process. Furthermore, a reactor specific methane formation rate (MFR of up to 8.85 ± 0.45 m3 m−3 d−1 was achieved. It could be shown that the microorganisms were able to adapt to higher temperatures within hours. The tests showed that TBR performance with regard to BHM can be significantly increased by increasing the operating temperature.

  9. Issues and approaches in control for autonomous reactor operation

    International Nuclear Information System (INIS)

    Vilim, R. B.; Khalil, H. S.; Wei, T. Y. C.

    2000-01-01

    A capability for autonomous and passively safe operation is one of the goals of the NERI funded development of Generation IV nuclear plants. An approach is described for evaluating the effect of increasing autonomy on safety margins and load behavior and for examining issues that arise with increasing autonomy and their potential impact on performance. The method provides a formal approach to the process of exploiting the innate self-regulating property of a reactor to make it less dependent on operator action and less vulnerable to automatic control system fault and/or operator error. Some preliminary results are given

  10. Modern control technology for improved nuclear reactor performance

    International Nuclear Information System (INIS)

    Oakes, L.C.

    1986-01-01

    One of the main complaints leveled at reactor control systems by utility spokesmen is complexity. One only has to look inside a power reactor control room to appreciate this viewpoint. The high reliability and versatility of modern microprocessors makes possible distributed control systems with only performance data and abnormal conditions being relayed to the control room. In a sense, this emulates the human-body control system where routine repetitive actions are handled in an involuntary manner. The significance of expert systems to the nuclear reactor control and safety systems is their ability to capture human and other expertise and make it available, upon demand, and under almost all circumstances. Thus, human problem-solving skills acquired by the learning process over a long period of time can be captured and employed with the reliability inherent in computers. This is especially important in nuclear plants when human operators are burdened by stress and emotional factors that have a dramatic effect on performance level

  11. OPAD: An expert system for research reactor operations and fault diagnosis using probabilistic safety assessment tools

    International Nuclear Information System (INIS)

    Verma, A.K.; Varde, P.V.; Sankar, S.; Prakash, P.

    1996-01-01

    A prototype Knowledge Based (KB) operator Adviser (OPAD) system has been developed for 100 MW(th) Heavy Water moderated, cooled and Natural Uranium fueled research reactor. The development objective of this system is to improve reliability of operator action and hence the reactor safety at the time of crises as well as normal operation. The jobs performed by this system include alarm analysis, transient identification, reactor safety status monitoring, qualitative fault diagnosis and procedure generation in reactor operation. In order to address safety objectives at various stages of the Operator Adviser (OPAD) system development the Knowledge has been structured using PSA tools/information in an shell environment. To demonstrate the feasibility of using a combination of KB approach with PSA for operator adviser system, salient features of some of the important modules (viz. FUELEX, LOOPEX and LOCAEX) have been discussed. It has been found that this system can serve as an efficient operator support system

  12. Core design concepts for high performance light water reactors

    International Nuclear Information System (INIS)

    Schulenberg, T.; Starflinger, J.

    2007-01-01

    Light water reactors operated under supercritical pressure conditions have been selected as one of the promising future reactor concepts to be studied by the Generation IV International Forum. Whereas the steam cycle of such reactors can be derived from modern fossil fired power plants, the reactor itself, and in particular the reactor core, still need to be developed. Different core design concepts shall be described here to outline the strategy. A first option for near future applications is a pressurized water reactor with 380 .deg. C core exit temperature, having a closed primary loop and achieving 2% pts. higher net efficiency and 24% higher specific turbine power than latest pressurized water reactors. More efficiency and turbine power can be gained from core exit temperatures around 500 .deg. C, which require a multi step heat up process in the core with intermediate coolant mixing, achieving up to 44% net efficiency. The paper summarizes different core and assembly design approaches which have been studied recently for such High Performance Light Water Reactors

  13. Current safety issues related to research reactor operation

    International Nuclear Information System (INIS)

    Alcala-Ruiz, F.

    2000-01-01

    The Agency has included activities on research reactor safety in its Programme and Budget (P and B) since its inception in 1957. Since then, these activities have traditionally been oriented to fulfil the Agency's functions and obligations. At the end of the decade of the eighties, the Agency's Research Reactor Safety Programme (RRSP) consisted of a limited number of tasks related to the preparation of safety related publications and the conduct of safety missions to research reactor facilities. It was at the beginning of the nineties when the RRSP was upgraded and expanded as a subprogramme of the Agency's P and B. This subprogramme continued including activities related to the above subjects and started addressing an increasing number of issues related to the current situation of research reactors (in operation and shut down) around the world such as reactor ageing, modifications and decommissioning. The present paper discusses some of the above issues as recognised by various external review or advisory groups (e.g., Peer Review Groups under the Agency's Performance Programme Appraisal System (PPAS) or the standing International Nuclear Safety Advisory Group (INSAG)) and the impact of their recommendations on the preparation and implementation of the part of the Agency's P and B relating to the above subject. (author)

  14. RA reactor operation and maintenance in 1989, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Sanovic, V.

    1989-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  15. Strategies of operation cycles in BWR type reactors

    International Nuclear Information System (INIS)

    Molina, D.; Sendino, F.

    1996-01-01

    The article analyzes the operation cycles in BWR type reactors. The cycle size of operation is the consequence on the optimization process of the costs with the technical characteristics of nuclear fuel and the characteristics of demand and production. The authors analyze the cases of Garona NP and Cofrentes NP, both with BWR reactors. (Author)

  16. A three-dimensional operational transient simulation of the CANDU core with typical reactor regulating system

    Energy Technology Data Exchange (ETDEWEB)

    Yeom, Choong Sub; Kim, Hyun Dae; Park, Kyung Seok; Park, Jong Woon [Institute for Advanced Engineering, Taejon (Korea, Republic of)

    1995-07-01

    This paper describes the results of simulation of a CANDU operational transient problem (re-startup after short shutdown) using the Coupled Reactor Kinetics(CRKIN) code developed previously with CANDU Reactor Regulating System (RRS) logic. The performance in the simulation is focused on investigating the behaviours of neutron power and regulating devices in accordance with the changes of xenon concentration following the operation of the RRS.

  17. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report [sr

  18. Reactor operating procedures for start up of continuously operated chemical plants

    NARCIS (Netherlands)

    Verwijs, J.W.; Verwijs, J.W.; Kösters, P.H.; van den Berg, Henderikus; Westerterp, K.R.; Kosters, P.G.H.

    1995-01-01

    Rules are presented for the startup of an adiabatic tubular reactor, based on a qualitative analysis of the dynamic behavior of continuously-operated vapor- and liquid-phase processes. The relationships between the process dynamics, operating criteria, and operating constraints are investigated,

  19. Efficient compliance with prescribed bounds on operational parameters by means of hypothesis testing using reactor data

    International Nuclear Information System (INIS)

    Sermer, P.; Olive, C.; Hoppe, F.M.

    2000-01-01

    - A common problem in any reactor operations is to comply with a requirement that certain operational parameters are constrained to lie within some prescribed bounds. The fundamental issue which is to be addressed in any compliance description can be stated as follows: The compliance definition, compliance procedures and allowances for uncertainties in data and accompanying methodologies, should be well defined and justifiable. To this end, a mathematical framework for compliance, in which the computed or measured estimates of process parameters are considered random variables, is described in this paper. This allows a statistical formulation of the definition of compliance with licence or otherwise imposed limits. An important aspect of the proposed methodology is that the derived statistical tests are obtained by a Monte Carlo procedure using actual reactor operational data. The implementation of the methodology requires a routine surveillance of the reactor core in order to perform the underlying statistical tests. The additional work required for surveillance is balanced by the fact that the resulting actions on the reactor operations, implemented in station procedures, make the reactor 'safer' by increasing the operating margins. Furthermore, increased margins are also achieved by efficient solution techniques which may allow an increase in reactor power. A rigorous analysis of a compliance problem using statistical hypothesis testing based on extreme value probability distributions and actual reactor operational data leads to effective solutions in the areas of licensing, nuclear safety, reliability and competitiveness of operating nuclear reactors. (author)

  20. 1984 Operation of the high flux reactor

    International Nuclear Information System (INIS)

    1985-01-01

    The programme resources in 1984 were largely devoted to the replacement of the old reactor vessel and its peripheral equipment. The original vessel had been in operation for more than 20 years and doubts had arisen about the condition of the aluminium tank after so long an exposure to neutrons. The operation, which had never been attempted before on a reactor of that size and complexity was planned and prepared over a number of years to take advantage of the occasion to provide a much improved vessel, incorporating the latest design features. The plant was shut down at the end of November 1983 and the 14 months operation began with a short cooling-off period for decay of short lived radioactivity followed by removal of the old tank and its dissection into pieces convenient for consolidation and storage as radioactive waste. After decontamination of the shielding pool, the new vessel and neutron beam tubes were installed and the reactor was recommissioned. Routine 45 MW operation was resumed on 14 February 1985 and has been uneventful since then

  1. Neurocontrol of Pressurized Water Reactors in Load-Follow Operations

    International Nuclear Information System (INIS)

    Lin Chaung; Shen Chihming

    2000-01-01

    The neurocontrol technique was applied to control a pressurized water reactor (PWR) in load-follow operations. Generalized learning or direct inverse control architecture was adopted in which the neural network was trained off-line to learn the inverse model of the PWR. Two neural network controllers were designed: One provided control rod position, which controlled the axial power distribution, and the other provided the change in boron concentration, which adjusted core total power. An additional feedback controller was designed so that power tracking capability was improved. The time duration between control actions was 15 min; thus, the xenon effect is limited and can be neglected. Therefore, the xenon concentration was not considered as a controller input variable, which simplified controller design. Center target strategy and minimum boron strategy were used to operate the reactor, and the simulation results demonstrated the effectiveness and performance of the proposed controller

  2. Operation experience with the TRIGA reactor Wien 2004

    International Nuclear Information System (INIS)

    Boeck, H.; Villa, M.

    2004-01-01

    The TRIGA Mark-II reactor in Vienna is now in operation for more than 42 years. The average operation time is about 230 days per year with 90 % of this time at nominal power of 250 kW. The remaining 10 % operation time is used for students' training courses at low power level. Pulse operation is rather infrequent with about 5 to 10 pulses per year. The utilization of this facility is excellent, the number of students participating in practical exercises has strongly increased, and also training courses for outside groups such as the IAEA or for the 2004 Eugene Wigner Course are using the reactor, because it is the only TRIGA reactor remaining in Austria. Therefore, there is no need for decommissioning and it is intended to operate it as long as possible into the next decade. Nevertheless, in early 2004 it was decided to prepare a report on a decommissioning procedure for a typical TRIGA Mark II reactor which lists the volumes, the activity and the weight of individual materials such as concrete, aluminium, stainless steel, graphite and others which will accumulate during this process (a summary of possible activated and contaminated materials and the activity of a single TRIGA fuel element as a function of fuel type and decay time in Bq is presented). The status of the reactor (instrumentation, fuel elements, cooling circuit, ventilation system, re-inspection and maintenance program, cost/benefit) is outlined. (nevyjel)

  3. Annual report 1990. Operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1990-01-01

    In 1990 the operation of the High Flux Reactor was carried out as planned. The availability was 96% of scheduled operating time. The average utilization of the reactor was 71% of the practical limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons, for radioisotope production, and for various smaller activities. General activities in support of running irradiation programmes progressed in the normal way. Development activities addressed upgrading of irradiation devices, neutron radiography and neutron capture therapy

  4. Annual report 1989 operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1989-01-01

    In 1989 the operation of the High Flux Reactor Petten was carried out as planned. The availability was more than 100% of scheduled operating time. The average occupation of the reactor by experimental devices was 72% of the practical occupation limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons and for radioisotope production. General activities in support of running irradiation programmes progressed in the normal way. Development activities addressed upgrading of irradiation devices, neutron radiography and neutron capture therapy

  5. Operating experience with the DRAGON High Temperature Reactor experiment

    International Nuclear Information System (INIS)

    Simon, R.A.; Capp, P.D.

    2002-01-01

    The Dragon Reactor Experiment in Winfrith/UK was a materials test facility for a number of HTR projects pursued in the sixties and seventies of the last century. It was built and managed as an OECD/NEA international joint undertaking. The reactor operated successfully between 1964 and 1975 to satisfy the growing demand for irradiation testing of fuels and fuel elements as well as for technological tests of components and materials. The paper describes the reactor's main experimental features and presents results of 11 years of reactor operation relevant for future HTRs. (author)

  6. Performance of the prism reactor's passive decay heat removal system

    International Nuclear Information System (INIS)

    Magee, P.M.; Hunsbedt, A.

    1989-01-01

    The PRISM modular reactor concept has a totally passive safety-grade decay heat removal system referred to as the Reactor Vessel Auxiliary Cooling System (RVACS) that rejects heat from the reactor by radiation and natural convection of air. The system is inherently reliable and is not subject to the failure modes commonly associated with active cooling systems. The thermal performance of RVACS exceeds requirements and significant thermal margins exist. RVACS has been shown to perform its function under many postulated accident conditions. The PRISM power plant is equipped with three methods for shutdown: condenser cooling in conjunction with intermediate sodium and steam generator systems, and auxiliary cooling system (ACS) which removes heat from the steam generator by natural convection of air and transport of heat from the core by natural convection in the primary and intermediate systems, and a safety- grade reactor vessel auxiliary cooling system (RVACS) which removes heat passively from the reactor containment vessel by natural convection of air. The combination of one active and two passive systems provides a highly reliable and economical shutdown heat removal system. This paper provides a summary of the RVACS thermal performance for expected operating conditions and postulated accident events. The supporting experimental work, which substantiates the performance predictions, is also summarized

  7. Operation and maintenance of the RB reactor, Annual report for 1976

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1976-01-01

    Due to its flexibility and relatively simple construction the RB reactor enabled direct measurements of a series of physical parameters. During 1976 the reactor operation exceeded the plan due to preparation of special experiments planned for the next period. It is planned to operate the reactor at higher power levels (50 W - 10 kw). A need for increasing the neutron flux a neutron converter was built in 1976. preliminary measurements showed that placing the neutron converter next to the reactor vessel enables achievement of irradiation and dosimetry measurements in the fast neutron flux. It is planned to purchase highly enriched fuel for the neutron converter. This annual report includes 5 Annexes with data concerning: operation, irradiation field around the RB reactor, maintenance of reactor components and instrumentation, purchase of new equipment, and the program for training reactor operators

  8. Operation and maintenance of the RB reactor, Annual report for 1977

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1977-01-01

    The annual report for 1977 includes the following: utilization of the RB reactor; new regulations and instructions for reactor operation; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Five annexes are concerned with: testing the properties of preamplifiers for linear and logarithmic experimental channels; properties of the neutron converter; maintenance of the reactor equipment; purchase of new equipment; and the program for training reactor operators

  9. Operation and utilizations of Dalat nuclear research reactor

    International Nuclear Information System (INIS)

    Hien, P.Z.

    1988-01-01

    The reconstructed Dalat nuclear research reactor was commissioned in March 1984 and up to September 1988 more than 6200 hours of operation at nominal power have been recorded. The major utilizations of the reactor include radioisotope production, activation analysis, nuclear data research and training. A brief review of the utilizations of the reactor is presented. Some aspects of reactor safety are also discussed. (author)

  10. Operating reactors licensing actions summary. Volume 5, Number 1

    International Nuclear Information System (INIS)

    1985-03-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  11. General areas needing chemical competence to support reactor operation

    International Nuclear Information System (INIS)

    Proksch, E.; Bildstein, H.

    1963-01-01

    Chemical competence is needed not only for the development of new types of reactors but also for the start-up and safe operation of reactors. The activities of chemistry and chemical engineering cover a number of fields, namely chemical analysis, radiochemical analysis, corrosion research, radiolysis of water and water purification. The author reviews fields in reactor operation and maintenance in which chemical competence is needed. (author). 9 refs

  12. The evaluation of operator reliability factors on power reactor

    International Nuclear Information System (INIS)

    Karlina, Itjeu; Supriatna, Piping; W, Suharyo; Santosa, Kussigit; Darlis; S, Bambang; Y, Sasongko

    1999-01-01

    The sophisticated technology system was not assured the reliability system itself because it has contained a part of human dependence affected successfully of reactor operation either how work smoothly and safe or failure ac cured and then accident appears promptly. The evaluation of operator reliability factor on ABWR power reactor has been carried out which consist of criterion skill and workload according to NUREG/CR-2254, NUREG/CR-4016 and NUREG-0835 the reactor operation reliability emphasize to the operator are synergic between skill and workload themselves. The employee's skill will affect to the type and level of their tasks. The operator's skill depend on education and experiences, position or responsibility of tasks, physical conditions (age uninvalid of physic/mental

  13. Selection method and device for reactor core performance calculation input indication

    International Nuclear Information System (INIS)

    Yuto, Yoshihiro.

    1994-01-01

    The position of a reactor core component on a reactor core map, which is previously designated and optionally changeable, is displayed by different colors on a CRT screen by using data of a data file incorporating results of a calculation for reactor core performance, such as incore thermal limit values. That is, an operator specifies the kind of the incore component to be sampled on a menu screen, to display the position of the incore component which satisfies a predetermined condition on the CRT screen by different colors in the form of a reactor core map. The position for the reactor core component displayed on the CRT screen by different colors is selected and designated on the screen by a touch panel, a mouse or a light pen, thereby automatically outputting detailed data of evaluation for the reactor core performance of the reactor core component at the indicated position. Retrieval of coordinates of fuel assemblies to be data sampled and input of the coordinates and demand for data sampling can be conducted at once by one menu screen. (N.H.)

  14. Operational stability of naringinase PVA lens-shaped microparticles in batch stirred reactors and mini packed bed reactors-one step closer to industry.

    Science.gov (United States)

    Nunes, Mário A P; Rosa, M Emilia; Fernandes, Pedro C B; Ribeiro, Maria H L

    2014-07-01

    The immobilization of naringinase in PVA lens-shaped particles, a cheap and biocompatible hydrogel was shown to provide an effective biocatalyst for naringin hydrolysis, an appealing reaction in the food and pharmaceutical industries. The present work addresses the operational stability and scale-up of the bioconversion system, in various types of reactors, namely shaken microtiter plates (volume ⩽ 2 mL), batch stirred tank reactors (volume reactor (PBR, 6.8 mL). Consecutive batch runs were performed with the shaken/stirred vessels, with reproducible and encouraging results, related to operational stability. The PBR was used to establish the feasibility for continuous operation, running continuously for 54 days at 45°C. The biocatalyst activity remained constant for 40 days of continuous operation. The averaged specific productivity was 9.07 mmol h(-1) g enzyme(-1) and the half-life of 48 days. Copyright © 2014 Elsevier Ltd. All rights reserved.

  15. Neutron field control cybernetics model of RBMK reactor operator

    International Nuclear Information System (INIS)

    Polyakov, V.V.; Postnikov, V.V.; Sviridenkov, A.N.

    1992-01-01

    Results on parameter optimization for cybernetics model of RBMK reactor operator by power release control function are presented. Convolutions of various criteria applied previously in algorithms of the program 'Adviser to reactor operator' formed the basis of the model. 7 refs.; 4 figs

  16. Comparison of Ontario Hydro's performance with world power reactors - 1981

    International Nuclear Information System (INIS)

    Dumka, B.R.

    1982-04-01

    The performance of Ontario Hydro's CANDU reactors in 1981 is compared with that of 123 world nuclear power reactors rated at 500 MW(e) or greater. The report is based on data extracted from publications, as well as correspondence with a number of utilities. The basis used is the gross capacity factor, which is defined as gross unit generation divided by the perfect gross output for the period of interest. The lowest of the published turbine and generator design ratings is used to determine the perfect gross output, unless the unit has been proven capable of consistently exceeding this value. The first six reactors in the rankings were CANDU reactors operated by Ontario Hydro

  17. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  18. Management of operational events in research reactor

    International Nuclear Information System (INIS)

    Zhong Heping; Yang Shuchun; Peng Xueming

    2001-01-01

    The author describes the tracing management process post-operational event in a research reactor based on nuclear safety code, under the background of the research reactor in Nuclear Power Institute of China. It presorts the definite measures to the event tracing and it up its management factors

  19. Fluidized-bed reactors processes and operating conditions

    CERN Document Server

    Yates, John G

    2016-01-01

    The fluidized-bed reactor is the centerpiece of industrial fluidization processes. This book focuses on the design and operation of fluidized beds in many different industrial processes, emphasizing the rationale for choosing fluidized beds for each particular process. The book starts with a brief history of fluidization from its inception in the 1940’s. The authors present both the fluid dynamics of gas-solid fluidized beds and the extensive experimental studies of operating systems and they set them in the context of operating processes that use fluid-bed reactors. Chemical engineering students and postdocs as well as practicing engineers will find great interest in this book.

  20. Reactor Physics Training

    International Nuclear Information System (INIS)

    Baeten, P.

    2007-01-01

    University courses in nuclear reactor physics at the universities consist of a theoretical description of the physics and technology of nuclear reactors. In order to demonstrate the basic concepts in reactor physics, training exercises in nuclear reactor installations are also desirable. Since the number of reactor facilities is however strongly decreasing in Europe, it becomes difficult to offer to students a means for demonstrating the basic concepts in reactor physics by performing training exercises in nuclear installations. Universities do not generally possess the capabilities for performing training exercises. Therefore, SCK-CEN offers universities the possibility to perform (on a commercial basis) training exercises at its infrastructure consisting of two research reactors (BR1 and VENUS). Besides the organisation of training exercises in the framework of university courses, SCK-CEN also organizes theoretical courses in reactor physics for the education and training of nuclear reactor operators. It is indeed a very important subject to guarantee the safe operation of present and future nuclear reactors. In this framework, an understanding of the fundamental principles of nuclear reactor physics is also necessary for reactor operators. Therefore, the organisation of a basic Nuclear reactor physics course at the level of reactor operators in the initial and continuous training of reactor operators has proven to be indispensable. In most countries, such training also results from the direct request from the safety authorities to assure the high level of competence of the staff in nuclear reactors. The objectives this activity are: (1) to provide training and education activities in reactor physics for university students and (2) to organise courses in nuclear reactor physics for reactor operators

  1. Reactor operator screening test experiences

    International Nuclear Information System (INIS)

    O'Brien, W.J.; Penkala, J.L.; Witzig, W.F.

    1976-01-01

    When it became apparent to Duquesne Light Company of Pittsburgh, Pennsylvania, that the throughput of their candidate selection-Phase I training-reactor operator certification sequence was something short of acceptable, the utility decided to ask consultants to make recommendations with respect to candidate selection procedures. The recommendation implemented was to create a Nuclear Training Test that would predict the success of a candidate in completing Phase I training and subsequently qualify for reactor operator certification. The mechanics involved in developing and calibrating the Nuclear Training Test are described. An arbitration decision that resulted when a number of International Brotherhood of Electrical Workers union employees filed a grievance alleging that the selection examination was unfair, invalid, not job related, inappropriate, and discriminatorily evaluated is also discussed. The arbitration decision favored the use of the Nuclear Training Test

  2. Recent performance experience with US light water reactor self-actuating safety and relief valves

    Energy Technology Data Exchange (ETDEWEB)

    Hammer, C.G.

    1996-12-01

    Over the past several years, there have been a number of operating reactor events involving performance of primary and secondary safety and relief valves in U.S. Light Water Reactors. There are several different types of safety and relief valves installed for overpressure protection of various safety systems throughout a typical nuclear power plant. The following discussion is limited to those valves in the reactor coolant systems (RCS) and main steam systems of pressurized water reactors (PWR) and in the RCS of boiling water reactors (BWR), all of which are self-actuating having a setpoint controlled by a spring-loaded disk acting against system fluid pressure. The following discussion relates some of the significant recent experience involving operating reactor events or various testing data. Some of the more unusual and interesting operating events or test data involving some of these designs are included, in addition to some involving a number of similar events and those which have generic applicability.

  3. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  4. Annual Report 1991. Operation of the high flux reactor

    International Nuclear Information System (INIS)

    Ahlf, J.; Gevers, A.

    1992-01-01

    In 1991 the operation of the High Flux Reactor was carried out as planned. The availability was more than 100% of scheduled operating time. The average utilization of the reactor was 69% of the practical limit. The reactor was utilized for research programmes in support of nuclear fission reactors and thermonuclear fusion, for fundamental research with neutrons, for radioisotope production, and for various smaller activities. Development activities addressed upgrading of irradiation devices, neutron capture therapy, neutron radiography and neutron transmutation doping of silicon. General activities in support of running irradiation programmes progressed in the normal way

  5. Mode of operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Morita, T.

    1976-01-01

    A method is proposed for the operation of a nuclear reactor guaranteeing an essentially symmetrical axial power distribution during normal operation by controlling the changes occuring in the reactor power partly by variation of the concentration of the neutron-absorbing element and partly by variation of the control rod positions. The representative parameters are recorded for the upper and lower half and adjusted to a predetermined reference value. In using this method, the axial power peals are reduced and power losses avoided. (RW) [de

  6. RA reactor operation and maintenance

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-02-01

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air

  7. Contribution of materials investigations and operating experience of reactor vessel internals to PWRs' safety, performance and reliability

    International Nuclear Information System (INIS)

    Lemaire, E.; Monteil, N.; Jardin, N.; Doll, M.

    2015-01-01

    The Reactor Pressure Vessel Internals (RVI) include all the components inside the pressure vessel, except the nuclear fuel, the rod cluster assemblies and the instrumentation. The RVI consist of bolted and welded structures that are divided into two sub-assemblies: the upper internals which are removed at every refueling outage and the lower internals which are systematically removed for inspection at every 10-year outage. The main functions of the RVI are to position the core, to support it, and to provide a coolant flow by channeling the fluid. Moreover, the lower internals contribute to a neutron protection of the reactor pressure vessel by absorbing most of the neutron flux from the core. Depending on their location and material composition, the RVI components can face different ageing phenomena, that are actual or potential (such as wear, fatigue, stress corrosion cracking, irradiation assisted stress corrosion cracking, hardening and loss of ductility due to neutron irradiation, irradiation creep and irradiation swelling). EDF has developed a strategy for managing ageing and demonstrating the capacity of the RVI to perform their design functions over 40 years of operation. This overall approach is periodically revisited to take into account the most recent knowledge obtained from the following main topics: Safety Analyses, Research-Development programs, In-Service Inspection (ISI) results, Maintenance programs and Metallurgical Examinations. Based on continuous improvements in those fields, the goal of this paper is to present the way that materials investigations and operating experience obtained on RVI are managed by EDF to improve RVI safety, performance and reliability. It is shown that a perspective of 60 years of operation of RVI components is supported by large Research-Development efforts combined with field experience. (authors)

  8. dynamic performance of research reactors

    International Nuclear Information System (INIS)

    Abo elnor, A.G.M.

    2007-01-01

    this work studies the dynamic performance of material testing reactor (MTR), where the dynamic performance of any reactor reflects its safety behavior and it should enhance its intrinsic characteristics s ystem corrects itself internally without introducing external corrective action . the present work analyzes and studies the dynamic performance of mtr through the transfer function. the servo system parameters can be changed to fit the system demand. the servo system is an excellent approximation to some of the practical servo system currently use in reactor control system, and a quadratic form of this sort should closely approximate the behavior of almost any type of physical equipment which might be chosen to drive a control rod. proposed changes in servo system parameters could enhance the dynamic performance of the system , but the suitable parameters can be evaluated by using the automatic reactor power control system model

  9. Method of operating water cooled reactor with blanket

    International Nuclear Information System (INIS)

    Suzuki, Katsuo.

    1988-01-01

    Purpose: To increase the production amount of fissionable plutonium by increasing the burnup degree of blanket fuels in a water cooled reactor with blanket. Method: Incore insertion assemblies comprising water elimination rods, fertile material rods or burnable poison rods are inserted to those fuel assemblies at the central portion of the reactor core that are situated at the positions not inserted with control rods in the earlier half of the operation cycle, while the incore reactor insertion assemblies are withdrawn at the latter half of the operation cycle of a nuclear reactor. As a result, it is possible to increase the power share of the blanket fuels and increase the fuel burnup degree to thereby increase the production amount of fissionable plutonium. Furthermore, at the initial stage of the cycle, the excess reactivity of the reactor can be suppressed to decrease the reactivity control share on the control rod. At the final stage of the cycle, the excess reactivity of the reactor core can be increased to improve the cycle life. (Kamimura, M.)

  10. Operation, maintenance and utilization of the RA reactor, Annual report 1978

    International Nuclear Information System (INIS)

    Milosevic, M.

    1978-12-01

    It has been planned for 1978 that the RA reactor would be operated for 158 dana at nominal power of 6.5 MW meaning production of 24 648 MWh. The plan was fulfilled since 24 652 MWh was produces. Reactor operation for 158 days is relevant to reactor operation for 200 days in the period before 1975. The reason is increased neutron flux achieved due to improved fuel management and the characteristics of the new 80% enriched fuel. At the end of 1978 the reactor core contained 45% of 80% enriched fuel elements. Increase of neutron flux has shortened the typical time needed for irradiation of the most important samples for isotope production. This significant success in reactor operation is at the same time an obligation for increasing its utilization. Some new trends proposed for increasing reactor utilization capacities were presented at the Conference on utilization of research nuclear reactors in Yugoslavia held in May 1978 [sr

  11. Modification of the Penn State Reactor to allow transverse and rotational core motion to increase operational versatility

    International Nuclear Information System (INIS)

    Hughes, Daniel E.

    1994-01-01

    At Penn State the Nuclear Engineering students have the opportunity to perform experiments in reactor physics, work with reactor and radiation instrumentation, and operate a nuclear reactor. These activities are done at the Penn State Breazeale Reactor (PSBR), a General Atomics Mark III TRIGA reactor. Unfortunately this activity alone can not fully support the facility. The PSBR is mandated by Penn State to provide a portion of its operating budget by selling services to users outside as well as inside Penn State. In order to increase the marketability of PSBR an upgrade program was started to increase the quality and versatility of operation. The PSBR is the longest operating university reactor in the United States. The first phase of the upgrade program began in 1992. The quality of operation was increased by replacing a 1965 vintage console with a more reliable digital control and monitoring system. The present phase of the upgrade program is to increase the versatility of operation by modifying the reactor to allow transverse and rotational core motion. Adding two more degrees of motion to the reactor core increases the capability of the facility to meet the needs of present and future users. This upgrade is being financed by a grant from the Department of Energy and matching funds from Penn State. (author)

  12. Operation of Packed-Bed Reactors Studied in Microgravity

    Science.gov (United States)

    Motil, Brian J.; Balakotaiah, Vemuri

    2004-01-01

    The operation of a packed bed reactor (PBR) involves gas and liquid flowing simultaneously through a fixed-bed of solid particles. Depending on the application, the particles can be various shapes and sizes but are generally designed to force the two fluid phases through a tortuous route of narrow channels connecting the interstitial space. The PBR is the most common type of reactor in industry because it provides for intimate contact and high rates of transport between the phases needed to sustain chemical or biological reactions. The packing may also serve as either a catalyst or as a support for growing biological material. Furthermore, this type of reactor is relatively compact and requires minimal power to operate. This makes it an excellent candidate for unit operations in support of long-duration human space activities.

  13. Performance of an innovative multi-stage anaerobic reactor during ...

    African Journals Online (AJOL)

    Start-up of an anaerobic reactor is a relatively delicate process and depends on various factors such as wastewater composition, available inoculum, operating conditions and reactor configuration. Accordingly, systematized operational procedures are important, mainly during the start-up of an anaerobic reactor.

  14. Human performance analysis in the frame of probabilistic safety assessment of research reactors

    International Nuclear Information System (INIS)

    Farcasiu, Mita; Nitoi, Mirela; Apostol, Minodora; Turcu, I.; Florescu, Gh.

    2005-01-01

    Full text: The analysis of operating experience has identified the importance of human performance in reliability and safety of research reactors. In Probabilistic Safety Assessment (PSA) of nuclear facilities, human performance analysis (HPA) is used in order to estimate human error contribution to the failure of system components or functions. HPA is a qualitative and quantitative analysis of human actions identified for error-likely situations or accident-prone situations. Qualitative analysis is used to identify all man-machine interfaces that can lead to an accident, types of human interactions which may mitigate or exacerbate the accident, types of human errors and performance shaping factors. Quantitative analysis is used to develop estimates of human error probability as effects of human performance in reliability and safety. The goal of this paper is to accomplish a HPA in the PSA frame for research reactors. Human error probabilities estimated as results of human actions analysis could be included in system event tree and/or system fault tree. The achieved sensitivity analyses determine human performance sensibility at systematically variations both for dependencies level between human actions and for operator stress level. The necessary information was obtained from operating experience of research reactor TRIGA from INR Pitesti. The required data were obtained from generic data bases. (authors)

  15. Analysis of Kinetic Parameter Effect on Reactor Operation Stability of the RSG-GAS Reactor

    International Nuclear Information System (INIS)

    Rokhmadi

    2007-01-01

    Kinetic parameter has influence to behaviour on RSG-GAS reactor operation. In this paper done is the calculation of reactivity curve, period-reactivity relation and low power transfer function in silicide fuel. This parameters is necessary and useful for reactivity characteristic analysis and reactor stability. To know the reactivity response, it was done reactivity insertion at power 1 watt using POKDYN code because at this level of power no feedback reactivity so important for reactor operation safety. The result of calculation showed that there is no change of significant a period-reactivity relation and transfer function at low power for 2.96 gU/cc, 3.55 gU/cc and 4.8 gU/cc density of silicide fuels. The result of the transfer function at low power showed that the reactor is critical stability with no feedback. The result of calculation also showed that reactivity response no change among three kinds of fuel densities. It can be concluded that from kinetic parameter point of view period-reactivity relation, transfer function at low power, and reactivity response are no change reactor operation from reactivity effect when fuel exchanged. (author)

  16. Extending the maximum operation time of the MNSR reactor.

    Science.gov (United States)

    Dawahra, S; Khattab, K; Saba, G

    2016-09-01

    An effective modification to extend the maximum operation time of the Miniature Neutron Source Reactor (MNSR) to enhance the utilization of the reactor has been tested using the MCNP4C code. This modification consisted of inserting manually in each of the reactor inner irradiation tube a chain of three polyethylene-connected containers filled of water. The total height of the chain was 11.5cm. The replacement of the actual cadmium absorber with B(10) absorber was needed as well. The rest of the core structure materials and dimensions remained unchanged. A 3-D neutronic model with the new modifications was developed to compare the neutronic parameters of the old and modified cores. The results of the old and modified core excess reactivities (ρex) were: 3.954, 6.241 mk respectively. The maximum reactor operation times were: 428, 1025min and the safety reactivity factors were: 1.654 and 1.595 respectively. Therefore, a 139% increase in the maximum reactor operation time was noticed for the modified core. This increase enhanced the utilization of the MNSR reactor to conduct a long time irradiation of the unknown samples using the NAA technique and increase the amount of radioisotope production in the reactor. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Jules Horowitz Reactor: Organisation for the Preparation of the Commissioning Phase and Normal Operation

    Energy Technology Data Exchange (ETDEWEB)

    Estrade, J.; Fabre, J. L.; Marcille, O. [French Alternative Energies end Atomic Energy Commission, Provence (France)

    2013-07-01

    The Jules Horowitz Reactor (JHR) is a new modern Material Testing Reactor (MTR) currently under construction at CEA Cadarache research centre in the south of France. It will be a major research facility in support to the development and the qualification of materials and fuels under irradiation with sizes and environment conditions relevant for nuclear power plants in order to optimise and demonstrate safe operations of existing power reactors as well as to support future reactors design. It will represent also an important research infrastructure for scientific studies dealing with material and fuel behaviour under irradiation. The JHR will contribute also to secure the production of radioisotope for medical application. This is a key public health stake. The construction of JHR which started in 2007 is going-on with target of commissioning by the end of 2017. The design of the reactor provides modern experimental capacity in support to R and D programs for the nuclear energy for the next 60 years. In parallel to the facility construction, the preparation of the future staff and of the organisation to operate the reactor safely, reliably and efficiently is an important issue. In this framework, many actions are in progress to elaborate: Ο the staffing and the organisational structure for the commissioning test phases and also for normal operation, Ο the documentation in support to the reactor operation (safety analysis report, general operating rules, procedures, instructions, ···), Ο the maintenance, in service and periodic test programs, Ο staff training programs by using dedicated facilities (simulator, ···) Ο commissioning test programs for ensuring that the layout of systems and subcomponents is completed in accordance with the design requirements, the specification performances and the safety criteria. These commissioning tests will also be helpful for transferring the knowledge on the installed systems to the operating group. This paper gives the

  18. Density dependence of reactor performance with thermal confinement scalings

    International Nuclear Information System (INIS)

    Stotler, D.P.

    1992-03-01

    Energy confinement scalings for the thermal component of the plasma published thus far have a different dependence on plasma density and input power than do scalings for the total plasma energy. With such thermal scalings, reactor performance (measured by Q, the ratio of the fusion power to the sum of the ohmic and auxiliary input powers) worsens with increasing density. This dependence is the opposite of that found using scalings based on the total plasma energy, indicating that reactor operation concepts may need to be altered if this density dependence is confirmed in future research

  19. Procedure for operating a heavy water cooled power reactor

    International Nuclear Information System (INIS)

    Rau, P.; Kumpf, H.

    1981-01-01

    Nuclear reactors cooled by heavy water usually have equipment for fuel element exchange during operation, with the primary circuit remaining contained. This fuel element exchange equipment is expensive and complicated in many respects. According to the invention, the heavy water is therefore replaced by light water after a certain time of operation in such way that light water is led in and heavy water is led off. After the replacement, at least a quarter of the fuel elements of the reactor core is exchanged with the reactor pressure vessel being open. Then the light water serving as a shielding is replaced by heavy water, with the reactor pressure vessel being closed. The invention is of interest particularly for high-conversion reactors. (orig.) [de

  20. Graphics and control for in-reactor operations

    International Nuclear Information System (INIS)

    Smith, A.L.

    1996-01-01

    A wide range of manipulator systems has been developed to carry out remotely operated inspection, repair and maintenance tasks at the Magnox reactors in the United Kingdom. A key factor in the improvement of these systems in recent years has been the extensive use of computer graphics as a real-time aid to the manipulator operator. This is exemplified by the reactor pressure vessel inspection work at the Bradwell reactor which is described in detail. The graphics sub-system of the control system for the manipulator plays a unique and wide-ranging role. The 3D modelling and simulation capability of the IGRIP software has contributed to the conceptual design, detailed path planning, rehearsal support, public relations, real-time manipulator display, post inspection documentation and quality assurance. (UK)

  1. Designing for a safe response to operational and severe accident initiators in the Integral Fast Reactor

    International Nuclear Information System (INIS)

    Vilim, R.B.

    1994-01-01

    A method is described for optimizing the plant control strategy for a liquid metal reactor with respect to safety margins sustained in unprotected upset events. The optimization is performed subject to the normal requirements for reactor startup, load change and compensation for reactivity changes over the cycle. The method provides a formal approach to the process of exploiting the innate self-regulating property of a metal fueled reactor to make it less dependent on operator action and less vulnerable to automatic control system fault and/or operator error

  2. Systemic model for the aid for operating of the reactor Siloe

    International Nuclear Information System (INIS)

    Royer, J.C.; Moulin, V.; Monge, F.

    1995-01-01

    The Service of the Reactor Siloe (CEA/DRN/DRE/SRS), fully aware of the abilities and knowledge of his teams in the field of research reactor operating, has undertaken a project of knowledge engineering in this domain. The following aims have been defined: knowledge capitalization for the installation in order to insure its perenniality and valorization, elaboration of a project for the aid of the reactor operators. This article deals with the different actions by the SRS to reach the aims: realization of a technical model for the operation of the Siloe reactor, development of a knowledge-based system for the aid for operating. These actions based on a knowledge engineering methodology, SAGACE, and using industrial tools will lead to an amelioration of the security and the operating of the Siloe reactor. (authors). 13 refs., 7 figs

  3. Development of operator thinking model and its application to nuclear reactor plant operation system

    International Nuclear Information System (INIS)

    Miki, Tetsushi; Endou, Akira; Himeno, Yoshiaki

    1992-01-01

    At first, this paper presents the developing method of an operator thinking model and the outline of the developed model. In next, it describes the nuclear reactor plant operation system which has been developed based on this model. Finally, it has been confirmed that the method described in this paper is very effective in order to construct expert systems which replace the reactor operator's role with AI (artificial intelligence) systems. (author)

  4. The operating reliability of the reactor coolant pump

    International Nuclear Information System (INIS)

    Grancy, W.

    1996-01-01

    There is a strong tendency among operating companies and manufacturers of nuclear power stations to further increase safety and operating availability of the plant and of its components. This applies also and particularly to reactor coolant pumps for the primary circuit of nuclear power stations of the type PWR. For 3 decades, ANDRITZ has developed and built such pumps and has attached great importance to the design of the complete pump rotor and of its essential surrounding elements, such as bearing and shaft seal. Apart from questions connected with design functioning of the pump there is one question of top priority: the operating reliability of the reactor coolant pump. The pump rotor (together with the rotor of the drive motor) is the only component within the primary system that permanently rotates at high speed during operation of the reactor plant. Many questions concerning design and configuration of such components cannot be answered purely theoretically, or they can only be answered partly. Therefore comprehensive development work and testing was necessary to increase the operating reliability of the pump rotor itself and of its surrounding elements. This contribution describes the current status of development and, as a focal point, discusses shaft sealing solutions elaborated so far. In this connection also a sealing system will be presented which aims for the first time at using a two-stage mechanical seal in reactor coolant pumps

  5. Artificial intelligence program in a computer application supporting reactor operations

    International Nuclear Information System (INIS)

    Stratton, R.C.; Town, G.G.

    1985-01-01

    Improving nuclear reactor power plant operability is an ever-present concern for the nuclear industry. The definition of plant operability involves a complex interaction of the ideas of reliability, safety, and efficiency. This paper presents observations concerning the issues involved and the benefits derived from the implementation of a computer application which combines traditional computer applications with artificial intelligence (AI) methodologies. A system, the Component Configuration Control System (CCCS), is being installed to support nuclear reactor operations at the Experimental Breeder Reactor II

  6. Code on the safety of nuclear research reactors: Operation

    International Nuclear Information System (INIS)

    1992-01-01

    The purpose of this publication is to provide the essential requirements and recommendations for the safe operation of research reactors, with emphasis on the supervisory and managerial aspects. However, the publication also provides some guidance and information on topics concerning all the organizations involved in operation. These objectives are expressed in terms of requirements and recommendations for the safe operation of research reactors. Emphasis is placed on the safety requirements that shall be met rather than on the ways in which they can be met. The requirements and recommendations may form the foundation necessary for a Member State to develop regulations and safety criteria for its research reactor programme.

  7. Dynamic operator actions analysis for inherently safe fast reactors and light water reactors

    International Nuclear Information System (INIS)

    Ho, V.; Apostolakis, G.

    1988-01-01

    A comparative dynamic human actions analysis of inherently safe fast reactors (ISFRs) and light water reactors (LWRs) in terms of systems response and estimated human error rates is presented. Brief overviews of the ISFR and LWR systems are given to illustrate the design differences. Key operator actions required by the ISFR reactor shutdown and decay heat removal systems are identified and are compared with those of the LWR. It is observed that, because of the passive nature of the ISFR safety-related systems, a large time window is available for operator actions during transient events. Furthermore, these actions are fewer in number, are less complex, and have lower error rates and less severe consequences than those of the LWRs. We expect the ISFR operator errors' contribution to risk is smaller (at least in the context of the existing human reliability models) than that of the LWRs. (author)

  8. Dynamics of nuclear reactor operational cycles

    International Nuclear Information System (INIS)

    Chapman, L.D.; Wayland, J.R.

    With this system dynamics computer model, one can explore the long term effects of a nuclear reactor program. Given an input demand for reactors, the consequences on each sector and the interactions among sectors can be simulated to provide a better understanding of the time development of a nuclear reactor program. The model permits the determination of various levels of activity as a function of time for plant enrichment, fuel fabrication, fuel reprocessing and storage of waste products. In addition, the rates of construction of reactors, spent fuel transit, disposal of waste, mining, shipping, recycling and enrichment can be investigated for optimal planning purposes. The model has been written in a very general manner so that it can be used to simulate any nuclear reactor program. It is an easy task to relate the amount of accidental or operational release of radioactive contaminants into our environment to the activity levels of each of the above sectors. (U.S.)

  9. MAPLE research reactor beam-tube performance

    International Nuclear Information System (INIS)

    Lee, A.G.; Lidstone, R.F.; Gillespie, G.E.

    1989-05-01

    Atomic Energy of Canada Limited (AECL) has been developing the MAPLE (Multipurpose Applied Physics Lattice Experimental) reactor concept as a medium-flux neutron source to meet contemporary research reactor applications. This paper gives a brief description of the MAPLE reactor and presents some results of computer simulations used to analyze the neutronic performance. The computer simulations were performed to identify how the MAPLE reactor may be adapted to beam-tube applications such as neutron radiography

  10. Systems for aiding operators at university-owned research reactors in Japan

    International Nuclear Information System (INIS)

    Nishihara, H.; Kimura, Y.; Shibata, T.

    1984-01-01

    University-owned research reactors are operated for various purposes, and small disturbances may arise from various experimental facilities. Also not uniform are the technical levels of operators who range from supervised-students to reactor physicists. Considerable efforts are therefore devoted to the preventive maintainance. With these boundary conditions imposed, systems for aiding operators are designed at these research reactor facilities. (author)

  11. Rapid-L Operator-Free Fast Reactor Concept Without Any Control Rods

    International Nuclear Information System (INIS)

    Kambe, Mitsuru; Tsunoda, Hirokazu; Mishima, Kaichiro; Iwamura, Takamichi

    2003-01-01

    The 200-kW(electric) uranium-nitride-fueled lithium-cooled fast reactor concept 'RAPID-L' to achieve highly automated reactor operation has been demonstrated. RAPID-L is designed for a lunar base power system. It is one of the variants of the RAPID (Refueling by All Pins Integrated Design) fast reactor concept, which enables quick and simplified refueling. The essential feature of the RAPID concept is that the reactor core consists of an integrated fuel assembly instead of conventional fuel subassemblies. In this small-size reactor core, 2700 fuel pins are integrated and encased in a fuel cartridge. Refueling is conducted by replacing a fuel cartridge. The reactor can be operated without refueling for up to 10 yr.Unique challenges in reactivity control systems design have been addressed in the RAPID-L concept. The reactor has no control rod but involves the following innovative reactivity control systems: lithium expansion modules (LEM) for inherent reactivity feedback, lithium injection modules (LIM) for inherent ultimate shutdown, and lithium release modules (LRM) for automated reactor startup. All these systems adopt 6 Li as a liquid poison instead of B 4 C rods. In combination with LEMs, LIMs, and LRMs, RAPID-L can be operated without an operator. This reactor concept is also applicable to the terrestrial fast reactors. In this paper, the RAPID-L reactor concept and its transient characteristics are presented

  12. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  13. Ten years's reactor operation at the Technical University Zittau - operation report

    International Nuclear Information System (INIS)

    Konschak, K.

    1990-01-01

    The Zittau Training and Research Reactor ZLFR is in use for purposes of teaching the engineers who will operate the nuclear power plants in the GDR since 10 years. Since commissioning it was started up more than 1600 times, approximately two thirds of the start-ups being utilized for purposes of teaching. A number of teaching experiments were installed that demonstrate fundamental technological processes in nuclear reactors in a manner easy to understand. The high level of nuclear safety manifests itself, among other things, in extremely low radiation exposures of the operating personal and the persons to be trained. (author)

  14. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1986-01-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  15. Enhanced performance of solid oxide electrolysis cells by integration with a partial oxidation reactor: Energy and exergy analyses

    International Nuclear Information System (INIS)

    Visitdumrongkul, Nuttawut; Tippawan, Phanicha; Authayanun, Suthida; Assabumrungrat, Suttichai; Arpornwichanop, Amornchai

    2016-01-01

    Highlights: • Process design of solid oxide electrolyzer integrated with a partial oxidation reactor is studied. • Effect of key operating parameters of partial oxidation reactor on the electrolyzer performance is presented. • Exergy analysis of the electrolyzer process is performed. • Partial oxidation reactor can enhance the solid oxide electrolyzer performance. • Partial oxidation reactor in the process is the highest exergy destruction unit. - Abstract: Hydrogen production without carbon dioxide emission has received a large amount of attention recently. A solid oxide electrolysis cell (SOEC) can produce pure hydrogen and oxygen via a steam electrolysis reaction that does not emit greenhouse gases. Due to the high operating temperature of SOEC, an external heat source is required for operation, which also helps to improve SOEC performance and reduce operating electricity. The non-catalytic partial oxidation reaction (POX), which is a highly exothermic reaction, can be used as an external heat source and can be integrated with SOEC. Therefore, the aim of this work is to study the effect of operating parameters of non-catalytic POX (i.e., the oxygen to carbon ratio, operating temperature and pressure) on SOEC performance, including exergy analysis of the process. The study indicates that non-catalytic partial oxidation can enhance the hydrogen production rate and efficiency of the system. In terms of exergy analysis, the non-catalytic partial oxidation reactor is demonstrated to be the highest exergy destruction unit due to irreversible chemical reactions taking place, whereas SOEC is a low exergy destruction unit. This result indicates that the partial oxidation reactor should be improved and optimally designed to obtain a high energy and exergy system efficiency.

  16. Summary report of the experimental fast reactor JOYO MK-III performance test

    International Nuclear Information System (INIS)

    Maeda, Yukimoto; Aoyama, Takafumi; Yoshida, Akihiro

    2004-03-01

    An upgrading project (MK-III project) was started to improve the irradiation capability of the experimental fast reactor JOYO. In this project, core replacement and increase of the reactor thermal power by the factor 1.4 were necessary for increasing the maximum fast neutron flux by the factor 1.3 and doubling the capacity for irradiation rigs. The modification of the cooling system that included the replacement of the main intermediate heat exchangers and the dump heat exchangers was completed in September 2000. After a series of system function tests, the performance test, of which objective is to fully characterize the upgraded core and heat transfer system, was started in June 2003. Twenty eight tests were selected and carried out as performance test, in order to confirm that the whole plant satisfy the design criteria and have sufficient characteristics (data necessary for safe and steady operation, core management, reactor control and monitoring) as an irradiation bed. After attaining the initial criticality of the core on 2nd July 2003, core characteristics (the excess reactivity, the isotherm temperature reactivity coefficient, the power reactivity coefficient and so on), plant characteristics (the plant heat balance, the adjustment of the temperature control system, the plant behavior at transient), shielding characteristics (dose rate distribution). As the result, it was confirmed that all the criteria regulated was satisfied and the core and plant have sufficient margins for full power operation, which was increased by the factor 1.4. Especially, nuclear analysis accuracy was verified by comparing the calculation with measured core characteristics of the initial core which consists of fifty five fresh fuel subassemblies. The operational data which is supposed to be useful for developing in-core anomaly detection system were also obtained. The operation manual and training simulator and design of next reactor development were revised based on the results

  17. Technical report on operating experience with boiling water reactor offgas systems

    International Nuclear Information System (INIS)

    Lo, R.; Barrett, L.; Grimes, B.; Eisenhut, D.

    1978-03-01

    Over 100 reactor years of Boiling Water Reactor (BWR) operating experience have been accumulated since the first commercial operation of BWRs. A number of incidents have occurred involving the ''offgas'' of these Boiling Water Reactors. This report describes the generation and processing of ''offgas'' in Boiling Water Reactors, the safety considerations regarding systems processing the ''offgas'', operating experience involving ignitions or explosions of ''offgas'' and possible measures to reduce the likelihood of future ignitions or explosions and to mitigate the consequences of such incidents should they occur

  18. RA Reactor operation and maintenance (I-IX), Part I

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling

  19. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.; Miokovic, J.

    1982-12-01

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10 13 cm -2 s -1 at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the outdated spare parts

  20. Thermal performance of Egypt's research reactor core (ET-RR-1)

    International Nuclear Information System (INIS)

    Khattab, M.; Mariy, A.

    1986-01-01

    The steady state thermal performance of the ET-RR-1 core system is theoretically investigated by different models describing the heat flux and the coolant mass flow rate. The magnitude of the heat generated by a fuel element depends upon its position in the core. Normal and uniform distributions for heat flux and coolant mass flow rate are considered. The clad and coolant temperatures at different core positions are evaluated and compared with the experimental measurements at different operating conditions. The results indicated large discrepancy between the predicted and the experimental results. Therefore, the previous models and the experimental results are evaluated in order to develop the best model that describes the thermal performance of the ET-RR-1 core. The adapted model gives 99.5% significant confidence limit. The effect of increasing the heat flux or decreasing the mass flow rate by 20% from its maximum recommended operating condition is tested and discussed. Also, the thermal behaviour towards increasing the reactor power more than its maximum operating condition is discussed. The present work could also be used in extending the investigation to other PWR reactor operating conditions

  1. Performance of water cooled nuclear power reactor fuels in India – Defects, failures and their mitigation

    International Nuclear Information System (INIS)

    Ganguly, Chaitanyamoy

    2015-01-01

    Water cooled and moderated nuclear power reactors account for more than 95% of the operating reactors in the world today. Light water reactors (LWRs) consisting of pressurized water reactor (PWR), their Russian counterpart namely VVER and boiling water reactor (BWR) will continue to dominate the nuclear power market. Pressurized heavy water reactor (PHWR), also known as CANDU, is the backbone of the nuclear power program in India. Updates on LWR and PHWR fuel performance are being periodically published by IAEA, OECD-NEA and the World Nuclear Association (WNA), highlighting fuel failure rate and the mitigation of fuel defects and failures. These reports clearly indicate that there has been significant improvement in in – pile fuel performance over the years and the present focus is to achieve zero fuel failure in high burn up and high performance fuels. The present paper summarizes the status of PHWR and LWR fuel performance in India, highlighting the manufacturing and the related quality control and inspection steps that are being followed at the PHWR fuel fabrication plant in order to achieve zero manufacturing defect which could contribute to achieving zero in – pile failure rate in operating and upcoming PHWR units in India. (author)

  2. Method of reactor operation

    International Nuclear Information System (INIS)

    Nakajima, Takeshi

    1988-01-01

    Purpose: To minimize the power change due to the increase in xenone and power distribution after reaching the rated power in the case of using fresh fuels no requiring conditioning operation thereby starting the nuclear reactor in a short period of time and stably. Method: When control rods are entirely inserted only with a purpose for the compensation of the reactivity in a xenon-unsaturated state such as upon starting of the nuclear reactor, peaking is generated in the lower portion of the reactor core. Therefore, it is necessary to insert control rods for additionally suppressing the peaking in the lower portion of the reactor core to a relatively shallow level. In view of the above, a plurality of control rods are divided into a first control rod group finally inserted in the rated power state and a second control rod group other than the above. Then, the power is once elevated to the rated power level by means of such an intermediate control rod pattern that the ratio of the total extraction amount between the first control rod group and the second control rod group is made constant. Then, the control rods are extracted stepwise while setting the ratio of the total extraction amount constant in accordance with the change of the accumulating amount of xenone, to thereby obtain the purpose. (kamimura, M.)

  3. Training and qualification of licensed reactor operators at General Public Utilities Nuclear Corporation

    International Nuclear Information System (INIS)

    Long, R.L.; Coe, R.P.

    1992-01-01

    Following the Three Mile Island-2 (TMI-2) accident in 1979, the utility responsible for managing the facility has looked closely at the training and qualification of its reactor operators. Performance-based operator training programmes are now in place, as required by the United States National Academy for Nuclear Training. Operators also participate directly in the development of a professional code of behaviour. (UK)

  4. Operational human performance reliability assessment (OHPRA)

    International Nuclear Information System (INIS)

    Haas, P.M.; Swanson, P.J.; Connelly, E.M.

    1993-01-01

    Operational Human Performance Reliability Assessment (OHPRA) is an approach for assessing human performance that is being developed in response to demands from modern process industries for practical and effective tools to assess and improve human performance, and therefore overall system performance and safety. The single most distinguishing feature of the approach is that is defines human performance in open-quotes operationalclose quotes terms. OHPRA is focused not on generation of human error probabilities, but on practical analysis of human performance to aid management in (1) identifying open-quotes fixableclose quotes problems and (2) providing input on the importance and nature of potential improvements. Development of the model in progress uses a unique approach for eliciting expert strategies for assessing performance. A PC-based model incorporating this expertise is planned. A preliminary version of the approach has already been used successfully to identify practical human performance problems in reactor and chemical process plant operations

  5. Dry cooling tower operating experience in the LOFT reactor

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1980-01-01

    A dry cooling tower has been uniquely utilized to dissipate heat generated in a small experimental pressurized water nuclear reactor. Operational experience revealed that dry cooling towers can be intermittently operated with minimal wind susceptibility and water hammer occurrences by cooling potential steam sources after a reactor scram, by isolating idle tubes from the external atmosphere, and by operating at relatively high pressures. Operating experience has also revealed that tube freezing can be minimized by incorporating the proper heating and heat loss prevention features

  6. Radiological monitoring related to the operation of PUSPATI's Triga Reactor

    International Nuclear Information System (INIS)

    Fatimah Mohamad Amin; Mohamad Yusof Mohamad Ali; Lau How Mooi; Idris Besar.

    1983-01-01

    Reactor operation is one of the main activities carried out at the Tun Ismail Atomic Research Centre (PUSPATI) which requires radiological monitoring. This paper describes the programme for radiological monitoring which is related to the operation of the 1 MW Triga MK II research reactor which was commissioned in July, 1982. This programme includes monitoring of the radiation and contamination levels of the reactor and its associated facilities and environmental monitoring of PUSPATI's site and its environs. The data presented in this paper covers the period between 1982 to 1983 which includes both the pre-operational and operational phases of the monitoring programme. (author)

  7. Reactor core performance estimating device

    International Nuclear Information System (INIS)

    Tanabe, Akira; Yamamoto, Toru; Shinpuku, Kimihiro; Chuzen, Takuji; Nishide, Fusayo.

    1995-01-01

    The present invention can autonomously simplify a neural net model thereby enabling to conveniently estimate various amounts which represents reactor core performances by a simple calculation in a short period of time. Namely, a reactor core performance estimation device comprises a nerve circuit net which divides the reactor core into a large number of spacial regions, and receives various physical amounts for each region as input signals for input nerve cells and outputs estimation values of each amount representing the reactor core performances as output signals of output nerve cells. In this case, the nerve circuit net (1) has a structure of extended multi-layered model having direct coupling from an upper stream layer to each of downstream layers, (2) has a forgetting constant q in a corrected equation for a joined load value ω using an inverse error propagation method, (3) learns various amounts representing reactor core performances determined using the physical models as teacher signals, (4) determines the joined load value ω decreased as '0' when it is to less than a predetermined value upon learning described above, and (5) eliminates elements of the nerve circuit net having all of the joined load value decreased to 0. As a result, the neural net model comprises an autonomously simplifying means. (I.S.)

  8. Simulator experiments: effects of experience of senior reactor operators and of presence of a shift technical advisor on performance in a boiling water reactor control room

    International Nuclear Information System (INIS)

    Beare, A.N.; Dorris, R.E.; Gray, L.H.

    1984-12-01

    This report describes the first experiment in a Nuclear Regulatory Commission-sponsored program of training simulator experiments and field data collection to evaluate the effects of selected performance shaping factors on the performance of nuclear power plant control room operators. The factors investigated were the experience level of the Senior Reactor Operator (SRO) and the presence of a Shift Technical Advisor (STA). Data were collected from 16 two-man crews of licensed operators (one SRO and one RO). The crews were split into high and low SRO-experience groups on the basis of the years of experience of the SROs as SROs. One half (4 of the 8 crews in each group) of the high- and low-SRO experience groups were assisted by an STA or an SRO acting as an STA. The crews responded to four simulated plant casualties which ranged in severity from an uncomplicated turbine trip to an anticipated transient without scram (ATWS). No significant differences in overall performance were found between groups led by high (25 to 114 months licensed as an SRO) and low (1 to 17 months as an SRO) experience SROs. However, crews led by low experience SROs tended to have shorter task performance times than crews led by high experience SROs. Although a tendency for the STA-assisted groups to score higher on four of the five measures was observed, the presence of the STA had no statistically significant effect on overall team performance. The correlation between individual performance, as measured by four of the task performance measures, and experience, measured by months as a licensed operator, was not statistically significant, nor was the correlation between task performance and recency of simulator training. 18 references, 5 figures, 13 tables

  9. Operation and maintenance of the RA reactor, Report on operation in 1966, task 6.08

    International Nuclear Information System (INIS)

    Milosevic, D. and others

    1966-12-01

    During 1966, RA reactor was operated at nominal power for 196 days and 28 days at lower power levels. The total production was 31015 MWh which is 3% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 644 users, of which 516 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1966, and a chart showing discrepancies from the plan. data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 37, of which 20 were caused by power cuts, 10 due to voltage instabilities, 4 due to human error and 3 due to failures of instrumentation. These data are compared to safety shutdown data of previous few years. There have been no accidents which could cause any significant effects. The incidents occurred during this year are described in detail. Detailed data concerning exposure of the personnel are part of this report

  10. Advanced development and operating experience with a canned motor pump under pressurized water reactor conditions

    International Nuclear Information System (INIS)

    Dittmer, H.; Reymann, A.; Seibig, B.; Reinecker, H.

    1988-01-01

    At the research reactor FRG-2, Geesthacht, an irradiation device is in operation for testing defective light-water-reactor (LWR) test fuel rods under pressurized water reactor conditions (320 0 C, 160 bar). The requirements to the canned motor pump for cooling water circulation: medium: Demineralized water, operating temperature 320 0 C, operating pressure 155 bar, radiation field of the reactor, integration in the irradiation capsule, helium leak rate -6 mbar.dm 3 .s -1 , minimum working life 3000 hours, were high and caused difficulties in the acquisition of this component. First test runs with supplied pumps showed that the desired working life could not be achieved. The results of the development steps, the test runs, and the performance in service show that for our range of applications, the best combination of materials for the radial bearings is silicon-infiltrated SiC (8% free Si) against the same material. These bearings allowed a good working life for the pump to be achieved. (orig./GL) [de

  11. Halden Boiling Water Reactor. Plant Performance and Heavy-Water Management

    Energy Technology Data Exchange (ETDEWEB)

    Aas, S.; Jamne, E.; Wullum, T.; Fjellestad, K. [Institutt for Atomenergi, OECD Halden Reactor Project, Halden (Norway)

    1968-04-15

    The Halden boiling heavy-water reactor, designed and built by the Norwegian Institutt for Atomenergi, has since June 1958 been operated as an international project. On its second charge the reactor was operated at power levels up to 25 MW and most of the time at a pressure of 28.5 kg/cm{sup 2}. During the period from July 1964 to December 1966 the plant availability was close to 64% including shutdowns because of test fuel failures and loading/unloading of fuel. Disregarding such stops, the availability was close to 90%. The average burnup of the core is about 6200 MWd/t UO{sub 2} : the most highly exposed elements have reached 10000 MWd/t UO{sub 2}. The transition temperature of the reactor tank has been followed closely. The results of the surveillance programme and the implication on the reactor operation are discussed. The reactor is located in a cave in a rock. Some experiences with such a containment are given. To locate failed test-fuel elements a fuel failure location system has been installed. A fission gas collection system has saved valuable reactor time during clean-up of the reactor system following test fuel failures. Apart from one incident with two of the control stations, the plant control and instrumentation systems have functioned satisfactorily. Two incidents with losses of 150 and 200 kg of heavy water have occurred. However, after improved methods for leakage detection had been developed, the losses have been kept better than 50 g/h . Since April 1962 the isotopic purity of the heavy water (14 t) has decreased from 99.75 to 99.62%. The tritium concentration is now slightly above 700 {mu}C/cm{sup 3}. This activity level has not created any serious operational or maintenance problems. An extensive series of water chemistry experiments has been performed to study the influence of various operating parameters on radiolytic gas formation. The main results of these experiments will be reported. Different materials such as mild steel, ferritic steel

  12. Thai research reactor

    International Nuclear Information System (INIS)

    Aramrattana, M.

    1987-01-01

    The Office of Atomic Energy for Peace (OAEP) was established in 1962, as a reactor center, by the virtue of the Atomic Energy for Peace Act, under operational policy and authority of the Thai Atomic Energy for Peace Commission (TAEPC); and under administration of Ministry of Science, Technology and Energy. It owns and operates the only Thai Research Reactor (TRR-1/M1). The TRR-1/M1 is a mixed reactor system constituting of the old MTR type swimming pool, irradiation facilities and cooling system; and TRIGA Mark III core and control instrumentation. The general performance of TRR-1/M1 is summarized in Table I. The safe operation of TRR-1/M1 is regulated by Reactor Safety Committee (RSC), established under TAEPC, and Health Physics Group of OAEP. The RCS has responsibility and duty to review of and make recommendations on Reactor Standing Orders, Reactor Operation Procedures, Reactor Core Loading and Requests for Reactor Experiments. In addition,there also exist of Emergency Procedures which is administered by OAEP. The Reactor Operation Procedures constitute of reactor operating procedures, system operating procedures and reactor maintenance procedures. At the level of reactor routine operating procedures, there is a set of Specifications on Safety and Operation Limits and Code of Practice from which reactor shift supervisor and operators must follow in order to assure the safe operation of TRR-1/M1. Table II is the summary of such specifications. The OAEP is now upgrading certain major components of the TRR-1/M1 such as the cooling system, the ventilation system and monitoring equipment to ensure their adequately safe and reliable performance under normal and emergency conditions. Furthermore, the International Atomic Energy Agency has been providing assistance in areas of operation and maintenance and safety analysis. (author)

  13. Experimental Investigation of the Hot Water Layer Effect on Upward Flow Open Pool Reactor Operability

    International Nuclear Information System (INIS)

    Abou Elmaaty, T.

    2014-01-01

    The open pool reactor offers a high degree of reliability in the handling and manoeuvring, the replacement of reactor internal components and the suing of vertical irradiation channels. The protection of both the operators and the reactor hall environment against radiation hazards is considered a matter of interest. So, a hot water layer is implemented above many of the research reactors main pool, especially those whose flow direction is upward flow. An experimental work was carried out to ensure the operability of the upward flow open pool research reactor with / without the hot water layer. The performed experiment showed that, the hot water layer is produced an inverse buoyant force make the water to diffuse downward against the ordinary natural circulation from the reactor core. An upward flow - open pool research reactor (with a power greater than 20 M watt) could not wok without a hot water layer. The high temperature of the hot water layer surface could release a considerable amount of water vapour into the reactor hall, so a heat and mass transfer model is built based on the measured hot water layer surface temperature to calculate the amount of released water vapour during the reactor operating period. The effects of many parameters like the ambient air temperature, the reactor hall relative humidity and the speed of the pushed air layer above the top pool end on the evaporation rate is studied. The current study showed that, the hot water layer system is considered an efficient shielding system against Gamma radiation for open pool upward flow reactor and that system should be operated before the reactor start up by a suitable period of time. While, the heat and mass transfer model results showed that, the amount of the released water vapour is increased as a result of both the increase in hot water layer surface temperature and the increase in air layer speed. As the increase in hot water layer surface temperature could produce a good operability

  14. Experimental Investigation of the Hot Water Layer Effect on Upward Flow Open Pool Reactor Operability

    International Nuclear Information System (INIS)

    Abou Elmaaty, T.

    2015-01-01

    The open pool reactor offers a high degree of reliability in the handling and manoeuvring, the replacement of reactor internal components and the swing of vertical irradiation channels. The protection of both the operators and the reactor hall environment against radiation hazards is considered a matter of interest. So, a hot water layer implemented above many of the research reactors main pool, especially those whose flow direction is upward flow. An experimental work was carried out to ensure the operability of the upward flow open pool research reactor with / without the hot water layer. The performed experiment showed that, the hot water layer produced an inverse buoyant force making the water to diffuse downward against the ordinary natural circulation from the reactor core. An upward flow-open pool research reactor (with a power greater than 20 Mw) could not wok without a hot water layer. The high temperature of the hot water layer surface could release a considerable amount of water vapour into the reactor hall, so a heat and mass transfer model is built based on the measured hot water layer surface temperature to calculate the amount of released water vapour during the reactor operating period. The effects of many parameters like the ambient air temperature, the reactor hall relative humidity and the speed of the pushed air layer above the top pool end on the evaporation rate is studied. The current study showed that, the hot water layer system is considered an efficient shielding system against gamma radiation for open pool upward flow reactor and that system should be operated before the reactor start up by a suitable period of time. While, the heat and mass transfer model results showed that, the amount of the released water vapour is increased as a result of both the increase in hot water layer surface temperature and the increase in air layer speed. As the increase in hot water layer surface temperature could produce a good operability conditions from

  15. In-situ inspection of grooves in reactor tube sheet using a remotely operated cast impression taking device

    International Nuclear Information System (INIS)

    Rajendran, S.; Ramakumar, M.S.

    1996-01-01

    Utmost importance is given to the in-service inspection of critical components of a reactor to ensure its reliable performance during the reactor operation. This paper describes a cast taking device using cold setting resin to take impression of the grooves being made in the tube sheet for sparger tube installation in pressurised heavy water reactor. (author)

  16. 78 FR 69139 - Physical Security-Design Certification and Operating Reactors

    Science.gov (United States)

    2013-11-18

    ... Operating Reactors AGENCY: Nuclear Regulatory Commission. ACTION: Standard review plan--draft section..., ``Physical Security--Design Certification and Operating Reactors.'' The public comment period was originally....regulations.gov and search for Docket ID NRC-2013-0225. Address questions about NRC dockets to Carol Gallagher...

  17. Contribution to multi-agents modeling of the operation of industrial processes: application to the operation of a pressurized water reactor under accidental situation

    International Nuclear Information System (INIS)

    Elias, P.

    1996-01-01

    This work is related to the CEA 'Escrime' project which concerns the reliability and functioning safety of nuclear reactors, and in particular the operation and supervision of nuclear installations. Its aim is the analysis and the formalizing of PWRs operation in order to define the collaboration and optimum sharing of tasks between human operators and automatized systems for an improved functioning safety. Chapter 1 describes the operation of nuclear reactors and the instrumentation and control activities. It focusses on the weaknesses of actual automatized systems and examines the interest of the multi-agents approach to build an improved automatized system. Chapter 2 presents the actual state of the art about multi-agent systems and about their application to reactor operation. Chapter 3 is devoted to the definition of the conceptual model of automatized systems developed in this work (distribution of operation activities, competition between agents, hierarchy, arbitration). Chapter 4 describes the computer model of the essential operating system elaborated according to the conceptual model defined above. Modeling is performed using Spirit and an application is described in chapter 5. (J.S.)

  18. Building reactor operator sustain expert system with C language integrated production system

    International Nuclear Information System (INIS)

    Ouyang Qin; Hu Shouyin; Wang Ruipian

    2002-01-01

    The development of the reactor operator sustain expert system is introduced, the capability of building reactor operator sustain expert system is discussed with C Language Integrated Production System (Clips), and a simple antitype of expert system is illustrated. The limitation of building reactor operator sustain expert system with Clips is also discussed

  19. Development of operation management database for research reactors

    International Nuclear Information System (INIS)

    Zhang Xinjun; Chen Wei; Yang Jun

    2005-01-01

    An Operation Database for Pulsed Reactor has been developed on the platform for Microsoft visual C++ 6.0. This database includes four function modules, fuel elements management, incident management, experiment management and file management. It is essential for reactor security and information management. (authors)

  20. Operational transparency: an advanced safeguards strategy for future on-load refuelled reactors

    International Nuclear Information System (INIS)

    Whitlock, J.J.; Trask, D.

    2012-01-01

    The IAEA's system for tracking fuel movement in an on-load refuelled heavy-water reactor is robust, but an opportunity remains to exploit the wealth of data streaming from the reactor vault during operation and provide real-time, third-party monitoring of reactor status and history. This concept of Operational Transparency would require that large amounts of operational data be reduced in near-real time to a small subset of high-level information. Operational Transparency would enhance the IAEA's ability to monitor the state of the core to an unprecedented level. This paper provides an overview of the novel concept of Operational Transparency in heavy water reactors, using potential application to CANDU reactors as an example, and explores some of the technical challenges that will need to be solved for efficient implementation. (author)

  1. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1983

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Raickovic, N.; Radivojevic, J.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1983-12-01

    After regular shutdown in November 1982, inspection of the fuel elements from the RA reactor core which was done from December 1982 - February 1983 has shown that there are deposits of aluminium oxides on the surface of the fuel cladding. After restart The RA reactor was operated at power levels from 1.8 - 2 MW, with 80% enriched uranium dioxide fuel elements. It was found that there was no corrosion of the fuel element cladding and that it was not possible to find the cause of surface deposition on the cladding surfaces without further operation. It was decided to purify the heavy water permanently during operation and to increase the heavy water flow by operating two pumps. This procedure was adopted in order to decrease the possibility of corrosion. The Safety committee of the Institute has approved this procedure for operating the RA reactor in 1983. The core was made of 80% enriched fuel, critical experiments were done until June 1983, and after that the operation was continued at power levels up to 2 MW [sr

  2. TRIGA reactor operating experience

    International Nuclear Information System (INIS)

    Anderson, T.V.

    1970-01-01

    The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections

  3. Improvement of operational performance and increase of safety of WWER-1000/V-392

    International Nuclear Information System (INIS)

    Kurakov, Y.A.; Dragunov, Y.G.; Podshibiakin, A.K.; Fil, N.S.; Krushelnitsky, V.N.; Berkovich, V.M.

    2001-01-01

    The national programme of nuclear power development approved by the Russian Federation Government in 1998 considers the design of WWER-1000/V-392 power unit as a priority project of the new generation NPP with improved operational performances and increased safety. The pilot unit of this design (NVAES-2) is licensed for construction at the Novovoronezh NPP site. The NVAES-2 design is developed on the basis of standard power unit with reactor plant V-320. Twenty units of this type are in operation at the nuclear power plants in Russia, Ukraine and Bulgaria having totally about 270 reactor-years of operation. Two more V-320 units are being commissioned this year at Rostov NPP and Temelin NPP. So, the WWER-1000/V-392 design is as a whole an evolutionary development of the operating standard unit WWER-1000/V-320. Many technical solutions aimed at increase of safety and improvement of operational performance of the plant are implemented in the NVAES-2 design, such as advanced reactor WWER-1000, passive system of residual power removal, passive system of the core flooding under loss-of-coolant accidents, and others. NVAES-2 design refers to a class of advanced light water reactors and corresponds to the international requirements imposed to the nuclear power plants to be put into operation after the year 2000. New V-392 power unit has a good perspective from the view point of extensive implementation in the framework of the nuclear electricity production in Russia. Design decisions on NVAES-2 power unit with WWER-1000/V-392 reactor plant which assure significantly higher safety level and improve economical performance as compared to the operating WWER-1000 units are briefly considered in the present paper. (author)

  4. Safe operation and maintenance of research reactor

    International Nuclear Information System (INIS)

    Munsorn, S.

    1999-01-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U 3 O 8 - Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  5. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  6. Study on operational aspect of natural circulation HLMC reactor (1)

    International Nuclear Information System (INIS)

    Sienicki, J.J.; Cahalan, J.E.; Spencer, B.W.

    2000-08-01

    The concept of a heavy liquid metal cooled fast reactor that achieves 100% natural circulation heat removal from the core has the potential to attain improved cost competitiveness through extreme simplification, proliferation resistance, and heightened passive safety. The concept offers the potential for simplifications in plant control strategies wherein inherent reactor feedbacks may restore balance between energy release and heat removal from the reactor during operation as well as providing passive reactivity shutdown in the event of transients involving failure to scram. This study was initiated to evaluate the operational characteristics of the 100% natural circulation reactor under normal and transient states using a plant dynamics analysis computer code and to seek design and operational optimization of the concept. In the current Phase I of the project, the stage for the overall study has been prepared. A coupled thermal hydraulics-kinetics plant dynamics analysis code has been developed/modified that has the capabilities to calculate operational and accident transients. Code input has been prepared for the heavy liquid metal cooled natural circulation reactor concept. A preliminary analysis using the plant dynamics code and its input to calculate three illustrative cases relevant to initial startup, shutdown following long-term operation, and change in turbine load demonstrates the capability to analyze typical transient cases. (author)

  7. The past and the future in the forty years of the IPR-R1 TRIGA MARK I reactor operation

    International Nuclear Information System (INIS)

    Maretti Junior, Fausto

    2008-01-01

    Full text: The nuclear IPR-R1 TRIGA Mark I Reactor operating in the Nuclear Technology Development Center, originally Institute for Radioactive Research in Minas Gerais, Brazil, was dedicated in November 11, 1960. Initially operating for the production of radioisotopes for different uses, it started later to be used in large scale for neutron activation analysis and training of operators for nuclear power plants. Many improvements have been made throughout these years to provide a better performance in its operation and safety conditions. A new cooling system to operate until 300 kW, a new control rod mechanism, an aluminum tank for the reactor pool, an optimization in the pneumatic system, a new reactor control console and a general remodeling of the reactor laboratory were some of the improvements added. During these years a lot of irradiations, analysis , MSc and PhD thesis, training courses and isotopes production take place at the reactor. This paper describes the improvements made, the results obtained during the past 40 years, type of works realized, isotopes produced, the neutron activation analysis and the precautions taken to ensure future safe operation of the reactor to give operators better conditions of safe work. (authors)

  8. Limits and conditions for permanent operation of the LVR-15 reactor

    International Nuclear Information System (INIS)

    1995-03-01

    The ''Limits and Conditions'' have been set up to demonstrate compliance with all nuclear safety requirements specified by the Decree of the Czechoslovak Atomic Energy Commission No. 9/1985, and to serve as a guide for the reactor operators to respond adequately to deviations from the required values in normal operation conditions. The publications is divided into the following chapters: (1) Safety limits of the LVR-15 reactor; (2) Adjusting the reactor protection and control system parameters; (3) Limiting conditions for normal operation modes; (4) Control requirements; and (5) reactor operation management. A document by the Institute for Research, Production, and Application of Radioisotopes specifying conditions for the acceptance of radioactive wastes to the central repository is appended. (P.A.). 7 tabs

  9. Nuclear Reactor RA Safety Report, Vol. 12, Accidents during reactor operation

    International Nuclear Information System (INIS)

    1986-11-01

    This volume includes description and analysis of typical accidents occurred during operation of RA reactor in chronological order, as follows: contamination of primary coolant circuit; leakage of heavy water from the primary coolant loop; contamination of vertical experimental channel; air contamination in the reactor building and loss of circulation of the primary coolant; failures of the vacuum pump and spent fuel packaging device; rupture of the spent fuel element cladding; dethronement's of capsule for irradiation of fuel element; rupture of the vertical experimental channel and contamination of the surroundings; swelling of a fuel element; appearance of deposits on the surface of the fuel elements cladding. The last chapter describes similar accidents occurred on nuclear reactors in the world [sr

  10. Proceedings of the international symposium on research reactor safety operations and modifications

    International Nuclear Information System (INIS)

    1990-03-01

    The International Symposium on Research Reactor Safety, Operations and Modifications was organized by the International Atomic Energy Agency in cooperation with Atomic Energy of Canada Limited-Research Company. The main objectives of this Symposium were: (1) to exchange information and to discuss current perspectives and concerns relating to all aspects to research reactor safety, operations, and modifications; and, (2) to present views and to discuss future initiatives and directions for research reactor design, operations, utilization, and safety. The symposium topics included: research reactor programmes and experience; research reactor design safety and analysis; research reactor modifications and decommissioning; research reactor licensing; and new research reactors. These topics were covered during eight oral sessions and three poster sessions. These Proceedings include the full text of the 93 papers presented. The subject of Symposium was quite wide-ranging in that it covered essentially all aspects of research reactor safety, operations, and modifications. This was considered to be appropriate and timely given the 326 research reactors currently in operation in some 56 countries; given the degree of their utilization which ranges from pure and applied research to radioisotopes production to basic training and manpower development; and given that many of these reactors are undergoing extensive modifications, core conversions, power upratings, and are becoming the subject of safety reassessment and regulatory reviews. Although the Symposium covered many topics, the majority of papers and discussions tended to focus mainly on research reactor safety. This was seen as a clear sign of the continuing recognition of the fundamental importance of identifying and addressing, particularly through international cooperation, issues and concerns associated with research reactor safety

  11. Performance demonstration experience for reactor pressure vessel shell ultrasonic testing

    International Nuclear Information System (INIS)

    Zado, V.

    1998-01-01

    The most ultrasonic testing techniques used by many vendors for pressurized water reactor (PWR) examinations were based on American Society of Mechanical Engineers 'Boiler and Pressurized Vessel Code' (ASME B and PV Code) Sections XI and V. The Addenda of ASME B and PV Code Section XI, Edition 1989 introduced Appendix VIII - 'Performance Demonstration for Ultrasonic Examination Systems'. In an effort to increase confidence in performance of ultrasonic testing of the operating nuclear power plants in United States, the ultrasonic testing performance demonstration examination of reactor vessel welds is performed in accordance with Performance Demonstration Initiative (PDI) program which is based on ASME Code Section XI, Appendix VIII requirements. This article provides information regarding extensive qualification preparation works performed prior EPRI guided performance demonstration exam of reactor vessel shell welds accomplished in January 1997 for the scope of Appendix VIII, Supplements IV and VI. Additionally, an overview of the procedures based on requirements of ASME Code Section XI and V in comparison to procedure prepared for Appendix VIII examination is given and discussed. The samples of ultrasonic signals obtained from artificial flaws implanted in vessel material are presented and results of ultrasonic testing are compared to actual flaw sizes. (author)

  12. Can a nuclear reactor operate for 100 years?

    International Nuclear Information System (INIS)

    Hertel, O.

    2010-01-01

    The TWR (Travelling Wave Reactor) concept was invented in the fifties, then forgotten and it reappeared in 2001 but it was considered too immature to be selected for the fourth generation of nuclear reactors, now an American company 'Terrapower' proposes one whose design is given in the article. This TWR operates with depleted uranium, only the lower part of the fuel rod involves uranium fuel with a civil enrichment ratio (less that 20%). The lower part of the fuel will ignite the fission reaction and enrich the part of fuel just above through neutron absorption. The burning part of the fuel will move up progressively. The main advantage of this reactor is that it can operate for decades without maintenance nor fuel loading. The principle is right on the paper but requires huge technological work to select materials and systems that will be able to withstand decades of operation time in harsh conditions. (A.C.)

  13. Fuel performance and fission product behaviour in gas cooled reactors

    International Nuclear Information System (INIS)

    1997-11-01

    The Co-ordinated Research Programme (CRP) on Validation of Predictive Methods for Fuel and Fission Product Behaviour was organized within the frame of the International Working Group on Gas Cooled Reactors. This International Working Group serves as a forum for exchange of information on national programmes, provides advice to the IAEA on international co-operative activities in advanced technologies of gas cooled reactors (GCRs), and supports the conduct of these activities. The objectives of this CRP were to review and document the status of the experimental data base and of the predictive methods for GCR fuel performance and fission product behaviour; and to verify and validate methodologies for the prediction of fuel performance and fission product transport

  14. Performance of Fragema fuel in pressurized water reactors

    International Nuclear Information System (INIS)

    Dumont, A.; Ravier, G.; Ballot, B.

    1986-06-01

    FRAGEMA fuel operating experience in power reactors is very extensive. Performance over a range of power and burnup levels for various operating conditions is quite satisfactory. However significant development programs are presently in progress to further extend our knowledge under increasingly severe operating conditions. In particular, upcoming data acquisition programs (1985-1988) will cover site and hot cell measurements on Gd poison rods, 4.5 % overenriched fuel rods over four operating cycles, 17 x 17 AFA fuel assemblies. For these products the same surveillance strategy as the one used for the standard assembly has been adopted, in order to continuously provide more data which can be used to upgrade design models and pave the way for the development of future products

  15. Operating history report for the Peach Bottom HTGR. Volume I. Reactor operating history

    International Nuclear Information System (INIS)

    Scheffel, W.J.; Baldwin, N.L.; Tomlin, R.W.

    1976-01-01

    The operating history for the Peach Bottom-1 Reactor is presented for the years 1966 through 1975. Information concerning general chemistry data, general physics data, location of sensing elements in the primary helium circuit, and postirradiation examination and testing of reactor components is presented

  16. Theoretical and experimental analysis of fast reactor fuel performance

    International Nuclear Information System (INIS)

    Kummerer, K.R.; Freund, D.; Steiner, H.

    1982-09-01

    In order to predict behavior, performance, and capability of prototypic fuel pins a standard operational scheme for the SNR-300 fast breeder reactor is established considering besides normal operation unscheduled power changes and shutdowns. The behavior during the whole lifetime is calculated using the updated SATURN codes and - for special conditions as power transients and skewed fuel rod power - the new TRANSIENT and TEXDIF codes. The results of these calculations are compared to experimental findings. It is demonstrated that the level of modeling and the knowledge of material properties under irradiation are sufficient for a quantitative description of the fuel pin performance under the above mentioned conditions. (orig.) [de

  17. Gas Reactor International Cooperative Program. Interim report. Construction and operating experience of selected European Gas-Cooled Reactors

    International Nuclear Information System (INIS)

    1978-09-01

    The construction and operating experience of selected European Gas-Cooled Reactors is summarized along with technical descriptions of the plants. Included in the report are the AVR Experimental Pebble Bed Reactor, the Dragon Reactor, AGR Reactors, and the Thorium High Temperature Reactor (THTR). The study demonstrates that the European experience has been favorable and forms a good foundation for the development of Advanced High Temperature Reactors

  18. Improvements in operational safety performance of the Magnox power stations

    Energy Technology Data Exchange (ETDEWEB)

    Marchese, C.J. [BNFL Magnox Generation, Berkeley (United Kingdom)

    2000-10-01

    In the 43 years since commencement of operation of Calder Hall, the first Magnox power station, there remain eight Magnox stations and 20 reactors still in operation, owned by BNFL Magnox Generation. This paper describes how the operational safety performance of these stations has significantly improved over the last ten years. This has been achieved against a background of commercial competition introduced by privatization and despite the fact that the Magnox base design belongs to the past. Finally, the company's future plans for continued improvements in operational safety performance are discussed. (author)

  19. A parametric study on characteristics for nuclear design of high-performance research reactor

    International Nuclear Information System (INIS)

    Joe, D. G.; Lee, C. S.; Lee, B. C.; Seo, C. G.; Chae, H. T.; Park, C.

    2003-01-01

    A conceptual design of advanced research reactor with high neutron performance has been performed at KAERI based on design and operation experience obtained from HANARO. In this study, nuclear characteristics of design parameters such as various types of fuel assemblies, structural materials of core and fuel assembly, and the number of absorber rods were analyzed. Among rod, plate and tube type fuel assemblies considered, tube type assembly seems to be preferable as a high performance research reactor fuel because of high thermal margin and neutron flux in reflector. Aluminium block as a structural material of core was shown to be superior to flow tube due to higher reactivity and thermal flux in reflector. The stiffener to fix plates in th fuel assembly had the no impact on fast flux in central trap. The reduction of thermal flux in reflector caused by the stiffener was about 7%. If the control absorber rods of 4 mm thickness were chosen, it would be possible to operate the reactor with fresh fuel assemblies from the initial core

  20. High performance light water reactor

    International Nuclear Information System (INIS)

    Squarer, D.; Schulenberg, T.; Struwe, D.; Oka, Y.; Bittermann, D.; Aksan, N.; Maraczy, C.; Kyrki-Rajamaeki, R.; Souyri, A.; Dumaz, P.

    2003-01-01

    The objective of the high performance light water reactor (HPLWR) project is to assess the merit and economic feasibility of a high efficiency LWR operating at thermodynamically supercritical regime. An efficiency of approximately 44% is expected. To accomplish this objective, a highly qualified team of European research institutes and industrial partners together with the University of Tokyo is assessing the major issues pertaining to a new reactor concept, under the co-sponsorship of the European Commission. The assessment has emphasized the recent advancement achieved in this area by Japan. Additionally, it accounts for advanced European reactor design requirements, recent improvements, practical design aspects, availability of plant components and the availability of high temperature materials. The final objective of this project is to reach a conclusion on the potential of the HPLWR to help sustain the nuclear option, by supplying competitively priced electricity, as well as to continue the nuclear competence in LWR technology. The following is a brief summary of the main project achievements:-A state-of-the-art review of supercritical water-cooled reactors has been performed for the HPLWR project.-Extensive studies have been performed in the last 10 years by the University of Tokyo. Therefore, a 'reference design', developed by the University of Tokyo, was selected in order to assess the available technological tools (i.e. computer codes, analyses, advanced materials, water chemistry, etc.). Design data and results of the analysis were supplied by the University of Tokyo. A benchmark problem, based on the 'reference design' was defined for neutronics calculations and several partners of the HPLWR project carried out independent analyses. The results of these analyses, which in addition help to 'calibrate' the codes, have guided the assessment of the core and the design of an improved HPLWR fuel assembly. Preliminary selection was made for the HPLWR scale

  1. Measurement control design and performance assessment in the Integral Fast Reactor fuel cycle

    International Nuclear Information System (INIS)

    Orechwa, Y.; Bucher, R.G.

    1994-01-01

    The Integral Fast Reactor (IFR)--consisting of a metal fueled and liquid metal cooled reactor together with an attendant fuel cycle facility (FCF)--is currently undergoing a phased demonstration of the closed fuel cycle at Argonne National Laboratory. The recycle technology is pyrometalurgical based with incomplete fission product separation and all transuranics following plutonium for recycle. The equipment operates in batch mode at 500 to 1,300 C. The materials are highly radioactive and pyrophoric, thus the FCF requires remote operation. Central to the material control and accounting system for the FCF are the balances for mass measurements. The remote operation of the balances limits direct adjustment. The radiation environment requires that removal and replacement of the balances be minimized. The uniqueness of the facility precludes historical data for design and performance assessment. To assure efficient operation of the facility, the design of the measurement control system has called for procedures which assess the performance of the balances in great detail and will support capabilities for the correction of systematic changes in the performance of the balances through software

  2. Operational Experience with the TRIGA Mark II Reactor of the University of Pavia

    Energy Technology Data Exchange (ETDEWEB)

    Tigliole, A. Borio Di; Alloni, D.; Cagnazzo, M.; Coniglio, M.; Lana, F.; Losi, A.; Magrotti, G.; Manera, S.; Marchetti, F.; Pappalardo, P.; Prata, M.; Provasi, M.C.; Salvini, A.; Scian, G.; Vinciguerra, G. [University of Pavia, Laboratory of Applied Nuclear Energy (L.E.N.A), Via Aselli 41, 27100 Pavia (Italy)

    2011-07-01

    The Laboratory of Applied Nuclear Energy (LENA) is an Interdepartmental Research Centre of the University of Pavia which operates a 250 kW TRIGA Mark II Research Nuclear Reactor, a Cyclotron for the production of radioisotopes and other irradiation facilities. The reactor is in operation since 1965 and many home-made upgrading were realized in the past years in order to assure a continuous operation of the reactor for the future. The annual reactor operational time at nominal power is in the range of 300 - 400 hours depending upon the time schedule of some experiments and research activities. The reactor is mainly used for NAA activities, BNCT research, samples irradiation and training. In specific, few tens of hours of reactor operation per year are dedicated to training courses for University students and for professionals. Besides, the LENA Centre hosts every year more than one thousand high school students in visit. Lately, LENA was certified ISO 9001:2008 for the ''operation and maintenance of the reactor'' and for the ''design and delivery of the irradiation service''. Nowadays the reactor shows a good technical state and, at the moment, there are no political or economical reason to consider the reactor shut-down. (author)

  3. The safety culture change process performed in Polish research reactor MARIA

    International Nuclear Information System (INIS)

    Golab, Andrzej

    2002-01-01

    The Safety Culture Change Process Performed in research reactor MARIA is described in this paper. The essential issues fulfilled in realization of the Safety Culture Enhancement Programme are related to the attitude and behaviour of top management, co-operating groups, operational personnel, relations between the operating organization and the supervising and advising organizations. Realization of this programme is based on changing the employees understanding of safety, changing their attitudes and behaviours by means of adequate training, requalification process and performing the broad self-assessment programme. Also a high level Quality Assurance Programme helps in development of the Safety Culture. (author)

  4. The Research on Operation Strategy of Nuclear Power Plant with Multi-reactors

    Energy Technology Data Exchange (ETDEWEB)

    Fang, Maoyao; Peng, Minjun; Cheng Shouyu [Harbin Engineering University, Harbin (China)

    2014-08-15

    In this paper, the operation characteristics and control strategy of nuclear power plant (NPP) with multi-modular pressurized water reactors (PWR) were researched through simulation. The main objective of this research was to ensure the coordinated operation and satisfy the convenience of turbine-generator and reactor's load adjustment in NPP with multi-reactors (MR). According to the operation characteristics of MR-NPP, the operation and control strategy was proposed, which was 'he average allocation of load for each reactor and maintaining average temperature of coolant at a constant? The control system was designed based the operation and control strategy. In order to research the operation characteristics and control strategy of MR-NPP, the paper established the transient analysis model which included the reactors and thermal hydraulic models, turbine model, could simulate and analyze on different operating conditions such as load reducing, load rising. Based on the proposed operation and control strategy and simulation models, the paper verified and validated the operation strategy and control system through load reducing, load rising. The results of research simulation showed that the operation strategy was feasible and can make the MR-NPP running safely as well as steadily on different operating conditions.

  5. The Research on Operation Strategy of Nuclear Power Plant with Multi-reactors

    International Nuclear Information System (INIS)

    Fang, Maoyao; Peng, Minjun; Cheng Shouyu

    2014-01-01

    In this paper, the operation characteristics and control strategy of nuclear power plant (NPP) with multi-modular pressurized water reactors (PWR) were researched through simulation. The main objective of this research was to ensure the coordinated operation and satisfy the convenience of turbine-generator and reactor's load adjustment in NPP with multi-reactors (MR). According to the operation characteristics of MR-NPP, the operation and control strategy was proposed, which was 'he average allocation of load for each reactor and maintaining average temperature of coolant at a constant? The control system was designed based the operation and control strategy. In order to research the operation characteristics and control strategy of MR-NPP, the paper established the transient analysis model which included the reactors and thermal hydraulic models, turbine model, could simulate and analyze on different operating conditions such as load reducing, load rising. Based on the proposed operation and control strategy and simulation models, the paper verified and validated the operation strategy and control system through load reducing, load rising. The results of research simulation showed that the operation strategy was feasible and can make the MR-NPP running safely as well as steadily on different operating conditions

  6. RB Research nuclear reactor, 30 years of operation; Istrazivacki nuclearni reaktor RB, povodom 30 godina rada

    Energy Technology Data Exchange (ETDEWEB)

    Pesic, M; Stefanovic, D [Boris Kidric Institute of nuclear sciences Vinca, Belgrade (Yugoslavia)

    1988-06-15

    Paper describes utilization, modifications and changes of construction and control-safety systems done at the RB reactor during 30 years of operation. Experiments performed at the reactor are summarized, new reactor equipment is described and the future plans are shown. Rad prikazuje eksploataciju reaktora RB tokom 30 godina rada, modifikacije i izmene u konstruktivnim i upravljacko-sigurnosnim sistemima. Sumirani su eksperimenti izvedeni na njemu, prikazana je nova oprema i planovi za buduci rad.

  7. Current status of operation and utilization of the Dalat research reactor

    International Nuclear Information System (INIS)

    Nguyen Nhi Dien; Le Van So

    2004-01-01

    The Dalat Nuclear Research Reactor (DNRR) is a 500 kW swimming pool type reactor using the Soviet WWR-SM fuel assembly with 36% enrichment of U-235. It was upgraded from the USA 250 kW TRIGA Mark-II reactor. The first criticality of the renovated reactor was in November 1983 and its regular operation at nominal power of 500 kW has been since March 1984. The DNRR is operated mainly in continuous runs of 100 hrs, once every 4 weeks, for radioisotope production, neutron activation analyses and research purposes. The remaining time between two continuous runs is devoted to maintenance activities and also to short run for physics experiments and training purpose. From the first start-up to the end of December 2002, it totaled about 24,700 hrs of operation and the total energy released was 490 MWd. After 10 years of operation with the core of 89-fuel assembly configuration, in April 1994, the first refueling work was done and the 100-fuel assembly configuration was set-up. The second fuel reloading was executed in March 2002. At present time, the working configuration of the reactor core consists of 104 fuel assemblies. This fuel reloading will ensure efficient exploitation of the reactor for about 3 years with 1200-1300 hrs per year at nominal power. The current status of operation and utilization and some activities related to the reactor core management of the DNRR are presented and discussed in this paper. (author)

  8. High performance biological methanation in a thermophilic anaerobic trickle bed reactor.

    Science.gov (United States)

    Strübing, Dietmar; Huber, Bettina; Lebuhn, Michael; Drewes, Jörg E; Koch, Konrad

    2017-12-01

    In order to enhance energy efficiency of biological methanation of CO 2 and H 2 , this study investigated the performance of a thermophilic (55°C) anaerobic trickle bed reactor (ATBR) (58.1L) at ambient pressure. With a methane production rate of up to 15.4m 3 CH4 /(m 3 trickle bed ·d) at methane concentrations above 98%, the ATBR can easily compete with the performance of other mixed culture methanation reactors. Control of pH and nutrient supply turned out to be crucial for stable operation and was affected significantly by dilution due to metabolic water production, especially during demand-orientated operation. Considering practical applications, inoculation with digested sludge, containing a diverse biocenosis, showed high adaptive capacity due to intrinsic biological diversity. However, no macroscopic biofilm formation was observed at thermophilic conditions even after 313days of operation. The applied approach illustrates the high potential of thermophilic ATBRs as a very efficient energy conversion and storage technology. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. Some post operational adjustments to the prototype fast reactor at Dounreay

    International Nuclear Information System (INIS)

    Lunt, A.R.W.

    1979-01-01

    Prior to and during the initial operation of the Prototype Fast Reactor at Dounreay certain features have been considered to be in need of adjustment to provide better operating characteristics. This article describes the work done to support the consequential changes of operational techniques and plant design in the following areas: maintenance of dry conditions at the superheater steam inlets, the temperature control of the reactor roof, and the introduction of a system enabling the reactor to continue running after a turbine trip. (author)

  10. TARMS, an on-line boiling water reactor operation management system. [3 D core simulator LOGOS 2

    Energy Technology Data Exchange (ETDEWEB)

    Iwamoto, T.; Sakurai, S.; Uematsu, H.; Tsuiki, M.; Makino, K.

    1984-12-01

    The TARMS (Toshiba Advanced Reactor Management System) software package was developed as an effective on-line, on-site tool for boiling water reactor core operation management. It was designed to support a complete function set to meet the requirement to the current on-line process computers. The functions can be divided into two categories. One is monitoring of the present core power distribution as well as related limiting parameters. The other is aiding site engineers or reactor operators in making the future reactor operating plan. TARMS performs these functions with a three-dimensional BWR core physics simulator LOGOS 2, which is based on modified one-group, coarse-mesh nodal diffusion theory. A method was developed to obtain highly accurate nodal powers by coupling LOGOS 2 calculations with the readings of an in-core neutron flux monitor. A sort of automated machine-learning method also was developed to minimize the errors caused by insufficiency of the physics model adopted in LOGOS 2. In addition to these fundamental calculational methods, a number of core operation planning aid packages were developed and installed in TARMS, which were designed to make the operator's inputs simple and easy.

  11. Towards harmonised self assessment of research reactor safety status in operating organisations

    International Nuclear Information System (INIS)

    Kirchsteiger, C.; Boeck, H.

    2006-01-01

    The objective of this paper is to describe the development of a methodology and corresponding web-based tool for mapping and cross-comparing the safety approaches in European and other Research Reactor (RR) facilities in order to detect the principal similarities and differences. As an example, the performance of a Probabilistic Safety Assessment (PSA) for RRs is mapped, as follows: is PSA performed at all? (Yes/No); if so, is PSA mandatory or just recommended? (Yes/No); what is the scope of PSA?, its objective? and practical use? (set of more detailed questions), etc. In this way, information on different types of safety verification practices and requirements for RRs from Europe, Argentina, Australia, Canada, South Africa and the USA has been collected in a systematic way and included in the web-based benchmarking tool DARES (DAtabase for REsearch Reactor Safety). DARES has been developed and filled with sample data by the European Commission's Joint Research Centre (JRC) together with members of the European Research Reactors Operator Group (RROG). A systematic mapping by using DARES in parallel to an international Working Group, consisting of both operators and authorities could be the starting point towards harmonisation of RR safety verification on an international level. In addition, the availability of a user-friendly Information System on the Internet such as DARES containing this information is considered a useful mechanism to exchange international experiences and practices in the area among qualified users. This approach is currently considered to be proposed to the International Atomic Energy Agency (IAES) as one possible application of the recently adopted IAEA Code of Conduct on the Safety of Research Reactors. The resulting process would be a self-assessment of the RR safety status in regulatory bodies and operating organisations relative to the guidance in the Code, practically realised and monitored by an Information System similar to DARES. (orig.)

  12. Design requirements, operation and maintenance of gas-cooled reactors

    International Nuclear Information System (INIS)

    1989-06-01

    At the invitation of the Government of the USA the Technical Committee Meeting on Design Requirements, Operation and Maintenance of Gas-Cooled Reactors, was held in San Diego on September 21-23, 1988, in tandem with the GCRA Conference. Both meetings attracted a large contingent of foreign participants. Approximately 100 delegates from 18 different countries participated in the Technical Committee meeting. The meeting was divided into three sessions: Gas-cooled reactor user requirement (8 papers); Gas-cooled reactor improvements to facilitate operation and maintenance (10 papers) and Safety, environmental impacts and waste disposal (5 papers). A separate abstract was prepared for each of these 23 papers. Refs, figs and tabs

  13. Current status of operation and utilization of the Dalat Research Reactor

    International Nuclear Information System (INIS)

    Dien, Nguyen Nhi

    2006-01-01

    The Dalat Nuclear Research Reactor (DNRR) is a 500 kW pool-type reactor using the HEU (36% enrichment) WWR-M2 fuel assemblies. It was renovated and upgraded from the USA 250 kW TRIGA Mark-II reactor. The first criticality of the renovated reactor was in the 1st November 1983 and its regular operation at nominal power of 500 kW has been since March 1984. The DNRR is operated mainly in continuous runs of 100 hrs, once every 4 weeks, for radioisotope production, neutron activation analysis, scientific research and training. The remaining time between two continuous runs is devoted to maintenance activities and also to short run for reactor physics and thermal hydraulics experiments. From the first start-up to the end of December 2004, it totaled about 27,253 hrs of operation and the total energy released was about 543 MWd. The first fuel reloading was executed in April 1994 after more than 10 years of operation with 89 fuel assemblies (FA). The 11 new FAs were added in the core periphery, at previous beryllium element locations. After reloading the working configuration of reactor core consisted of 100 FAs. The second fuel reloading was executed in March 2002. The 4 new FAs were added in the core periphery, at previous beryllium element locations. The working configuration of 104 FAs ensured efficient exploitation of the DNRR at nominal power for about 3000 hrs since March 2002. In order to provide excess reactivity for the reactor operation without the need to discharge high burned FAs, in June 2004, the fuel shuffling of the reactor core was done. 16 FAs with low burn-up from the core periphery were moved toward the core center and 16 FAs with high-burn-up from the core center were moved toward the core periphery. This operation provided additional reactivity of about 0.85 β eff that the current reactor configuration using re-shuffled HEU fuel is expected to allow normal operation until June 2006. In 1999, the request of returning to Russia HEU fuels from foreign

  14. Development, operational experience and implications for future design of fast reactors in Western Europe

    International Nuclear Information System (INIS)

    Brandstetter, A.; Broomfield, A.M.; Saitcevsky, B.

    1990-01-01

    Over the past 30 years, the partners now collaborating in Europe on fast-reactor development have taken the technology from a theoretical possibility to an engineering reality. In that time there has been a progression from experimental zero-energy facilities followed by small power-producing engineering test reactors, to prototype reactors and a large commercial-size reactor. The paper describes the highlights of the reactor programmes in the partner countries and by example illustrates the experience gained from reactor operation and some of the principal activities in the supporting development programme. These include such topics as fuel performance, fast-neutron physics, liquid-metal thermal hydraulics, sodium chemistry, instrumentation and safety aspects. The paper concludes by summarizing some of the main objectives of the current development programme, which is directed to the support of the European Fast Reactor design being prepared by the European design and construction companies. (author)

  15. Performance evaluation of full scale UASB reactor in treating stillage wastewater

    Directory of Open Access Journals (Sweden)

    A.Mirsepasi , H. R. Honary , A. R. Mesdaghinia, A. H. Mahvi , H. Vahid , H. Karyab

    2006-04-01

    Full Text Available Upflow anaerobic sludge blanket (UASB reactors have been widely used for treatment of industrial wastewater. In this study two full-scale UASB reactors were investigated. Volume of each reactor was 420 m3. Conventional parameters such as pH, temperature and efficiency of COD, BOD, TOC removal in each reactor were investigated. Also several initial parameters in designing and operating of UASB reactors, such as upflow velocity, organic loading rate (OLR and hydraulic retention time were investigated. After modifying in operation conditions in UASB-2 reactor, average COD removal efficiency at OLR of 10–11 kg COD / m3 day was 55 percent. In order to prevent solids from settling, upflow velocity was increased to 0.35 m/h. Also to prevent solids from settling, the hydraulic retention time of wastewater in UASB-2 reactor was increased from 200 to 20 hours. This was expected that with good operation of UASB-2 reactor and with expanding of granules in the bed of the reactor, COD removal efficiency will be increased to more than 80 percent. But, because of deficiency on granulation and operation in UASB-2 reactor, this was not achieved. COD removal efficiency in the UASB-1 reactor was little. To enhance COD efficiency of UASB-1 reactor, several parameters were needed to be changed. These changes included enhancing of OLRs and upflow velocity, decreasing hydraulic retention time and operating with new sludge.

  16. Work Domain Analysis of a Predecessor Sodium-cooled Reactor as Baseline for AdvSMR Operational Concepts

    Energy Technology Data Exchange (ETDEWEB)

    Ronald Farris; David Gertman; Jacques Hugo

    2014-03-01

    This report presents the results of the Work Domain Analysis for the Experimental Breeder Reactor (EBR-II). This is part of the phase of the research designed to incorporate Cognitive Work Analysis in the development of a framework for the formalization of an Operational Concept (OpsCon) for Advanced Small Modular Reactors (AdvSMRs). For a new AdvSMR design, information obtained through Cognitive Work Analysis, combined with human performance criteria, can and should be used in during the operational phase of a plant to assess the crew performance aspects associated with identified AdvSMR operational concepts. The main objective of this phase was to develop an analytical and descriptive framework that will help systems and human factors engineers to understand the design and operational requirements of the emerging generation of small, advanced, multi-modular reactors. Using EBR-II as a predecessor to emerging sodium-cooled reactor designs required the application of a method suitable to the structured and systematic analysis of the plant to assist in identifying key features of the work associated with it and to clarify the operational and other constraints. The analysis included the identification and description of operating scenarios that were considered characteristic of this type of nuclear power plant. This is an invaluable aspect of Operational Concept development since it typically reveals aspects of future plant configurations that will have an impact on operations. These include, for example, the effect of core design, different coolants, reactor-to-power conversion unit ratios, modular plant layout, modular versus central control rooms, plant siting, and many more. Multi-modular plants in particular are expected to have a significant impact on overall OpsCon in general, and human performance in particular. To support unconventional modes of operation, the modern control room of a multi-module plant would typically require advanced HSIs that would

  17. The Jules Horowitz Reactor - A new High Performance European Material Testing Reactor open to International Users Present Status and Objectives

    International Nuclear Information System (INIS)

    Iracane, Daniel; Bignan, Gilles; Lindbaeck, Jan-Erik; Blomgren, Jan

    2010-01-01

    The development of sustainable nuclear energy requires R and D on fuel and material behaviour under irradiation with a high level of performance in order to meet the needs and challenges for the benefit of industry, research and public bodies. These stakes require a sustainable and secured access to an up-to-date high performance Material Testing Reactor. Following a broad survey within the European Research Area, the international community agreed that the need for Material Test Reactors in support of nuclear power plant safety and operation will continue in the context of sustainable nuclear energy. The Jules Horowitz Reactor project (JHR) copes with this context. JHR is designed as a user facility addressing the needs of the international community. This means: - flexibility with irradiation loops able to reproduce a large variation in operation conditions of different power reactor technologies, - high flux capacity to address Generations II, III, and IV needs. JHR is designed, built and operated as an international user facility because: - Given the maturity and globalization of the industry, domestic tools have no more the required level of economic and technical efficiency. Meanwhile, countries with nuclear energy need an access to high performance irradiation experimental capabilities to support technical skill and guarantee the competitiveness and safety of nuclear energy. - Many research items related to safety or public policy (waste management, etc.) require international cooperation to share costs and benefits of resulting consensus. JHR design is optimised for offering high performance material and fuel irradiation capability for the coming decades. This project is driven and funded by an international consortium gathering vendors, utilities and public stakeholders. This consortium has been set up in March 2007 when the construction began. The construction is in progress and the start of operation is scheduled for 2014. The JHR is a research

  18. An operator support system for research reactor operations and fault diagnosis through a connectionist framework and PSA based knowledge based systems

    International Nuclear Information System (INIS)

    Varde, P.V.; Sankar, S.; Verma, A.K.

    1998-01-01

    During reactor upset/abnormal conditions, emphasis is placed on the plant operator's ability to quickly identify the problem and perform diagnosis and initiate recovery action to ensure the safety of the plant. However, the reliability of human action is adversely affected at the time of crisis due to time stress and psychological factors. The availability of operational aids capable of monitoring the status of the plant and quickly identifying the deviation from normal operation is expected to significantly improve the operator reliability. The development of operator support systems using probabilistic safety assessment (PSA) techniques and information is finding wide application in nuclear plant operation. Often it is observed that most of the applications use a rule-based approach for diagnosis as well as safety status/transient conditions monitoring. A more efficient approach using artificial neural networks for safety status/transient condition monitoring and rule-based systems for diagnosis and emergency procedure generation has been applied for the development of a prototype operator adviser (OPAD) system for a 100 MW(th) heavy water moderated, cooled and natural uranium fueled research reactor. The development objective of this system is to improve the reliability of operator action and hence the reactor safety at the time of crisis as well as in normal operation. In order to address safety objectives at various stages of development of OPAD, the PSA techniques and tools have been used for knowledge representation. It has been demonstrated, with recall tests on the artificial neural network, that it can efficiently identify the reactor status in real-time scenario. This paper discusses various issues related to the development of an operator support system in a comprehensive way, right from the study of safety objectives, to data collection, to implementation of such a system

  19. Operation performance and granule characterization of upflow anaerobic sludge blanket (UASB) reactor treating wastewater with starch as the sole carbon source.

    Science.gov (United States)

    Lu, Xueqin; Zhen, Guangyin; Estrada, Adriana Ledezma; Chen, Mo; Ni, Jialing; Hojo, Toshimasa; Kubota, Kengo; Li, Yu-You

    2015-03-01

    Long-term performance of a lab-scale UASB reactor treating starch wastewater was investigated under different hydraulic retention times (HRT). Successful start-up could be achieved after 15days' operation. The optimal HRT was 6h with organic loading rate (OLR) 4g COD/Ld at COD concentration 1000mg/L, attaining 81.1-98.7% total COD removal with methane production rate of 0.33L CH4/g CODremoved. Specific methane activity tests demonstrated that methane formation via H2-CO2 and acetate were the principal degradation pathways. Vertical characterizations revealed that main reactions including starch hydrolysis, acidification and methanogenesis occurred at the lower part of reactor ("main reaction zone"); comparatively, at the up converting acetate into methane predominated ("substrate-shortage zone"). Further reducing HRT to 3h caused volatile fatty acids accumulation, sludge floating and performance deterioration. Sludge floating was ascribed to the excess polysaccharides in extracellular polymeric substances (EPS). More efforts are required to overcome sludge floating-related issues. Copyright © 2015 Elsevier Ltd. All rights reserved.

  20. Fuel performance and fission product behaviour in gas cooled reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The Co-ordinated Research Programme (CRP) on Validation of Predictive Methods for Fuel and Fission Product Behaviour was organized within the frame of the International Working Group on Gas Cooled Reactors. This International Working Group serves as a forum for exchange of information on national programmes, provides advice to the IAEA on international co-operative activities in advanced technologies of gas cooled reactors (GCRs), and supports the conduct of these activities. The objectives of this CRP were to review and document the status of the experimental data base and of the predictive methods for GCR fuel performance and fission product behaviour; and to verify and validate methodologies for the prediction of fuel performance and fission product transport. Refs, figs, tabs.

  1. Impact of closed Brayton cycle test results on gas cooled reactor operation and safety

    International Nuclear Information System (INIS)

    Wright, St.A.; Pickard, P.S.

    2007-01-01

    This report summarizes the measurements and model predictions for a series of tests supported by the U.S. Department of Energy that were performed using the recently constructed Sandia Brayton Loop (SBL-30). From the test results we have developed steady-state power operating curves, controls methodologies, and transient data for normal and off-normal behavior, such as loss of load events, and for decay heat removal conditions after shutdown. These tests and models show that because the turbomachinery operates off of the temperature difference (between the heat source and the heat sink), that the turbomachinery can continue to operate (off of sensible heat) for long periods of time without auxiliary power. For our test hardware, operations up to one hour have been observed. This effect can provide significant operations and safety benefits for nuclear reactors that are coupled to a Brayton cycles because the operating turbomachinery continues to provide cooling to the reactor. These capabilities mean that the decay-heat removal can be accommodated by properly managing the electrical power produced by the generator/alternator. In some conditions, it may even be possible to produce sufficient power to continue operating auxiliary systems including the waste heat circulatory system. In addition, the Brayton plant impacts the consequences of off-normal and accident events including loss of load and loss of on-site power. We have observed that for a loss of load or a loss of on-site power event, with a reactor scram, the transient consists initially of a turbomachinery speed increase to a new stable operating point. Because the turbomachinery is still spinning, the reactor is still being cooled provided the ultimate heat sink remains available. These highly desirable operational characteristics were observed in the Sandia Brayton loop. This type of behavior is also predicted by our models. Ultimately, these results provide the designers the opportunity to design gas

  2. Power probability density function control and performance assessment of a nuclear research reactor

    International Nuclear Information System (INIS)

    Abharian, Amir Esmaeili; Fadaei, Amir Hosein

    2014-01-01

    Highlights: • In this paper, the performance assessment of static PDF control system is discussed. • The reactor PDF model is set up based on the B-spline functions. • Acquaints of Nu, and Th-h. equations solve concurrently by reformed Hansen’s method. • A principle of performance assessment is put forward for the PDF of the NR control. - Abstract: One of the main issues in controlling a system is to keep track of the conditions of the system function. The performance condition of the system should be inspected continuously, to keep the system in reliable working condition. In this study, the nuclear reactor is considered as a complicated system and a principle of performance assessment is used for analyzing the performance of the power probability density function (PDF) of the nuclear research reactor control. First, the model of the power PDF is set up, then the controller is designed to make the power PDF for tracing the given shape, that make the reactor to be a closed-loop system. The operating data of the closed-loop reactor are used to assess the control performance with the performance assessment criteria. The modeling, controller design and the performance assessment of the power PDF are all applied to the control of Tehran Research Reactor (TRR) power in a nuclear process. In this paper, the performance assessment of the static PDF control system is discussed, the efficacy and efficiency of the proposed method are investigated, and finally its reliability is proven

  3. The Influence of RSG-GAS Primary Pump Operation Concerning the Rise Water Level of Reactor Pool in 15 MW Reactor Power

    International Nuclear Information System (INIS)

    Djunaidi

    2004-01-01

    The expansion of air volume in the delay chamber shows in rise water level of reactor pool during the operation. The rises of water level in the reactor pool is not quite from the expansion of air volume in the delay chamber, but some influence the primary pump operation. The purpose evaluated of influence primary pump is to know the influence primary pump power concerning the rise water level during the reactor operation. From the data collection during 15 MW power operation in the last core 42 the influence of primary pump operation concerning the rise water level in the reactor pool is 34.48 % from the total increased after operation during 12 days. (author)

  4. Performance Variation of Spent Resin in Mixed Bed From Water Purifying System of Xi'an Pulse Reactor

    International Nuclear Information System (INIS)

    Li Hua; Ma Yan; Xiao Yan; Liu Yueheng; Yang Yongqing

    2010-01-01

    Detailed physical and chemical characteristic analysis was performed on the spent cation and anion resins in the mixed bed from Xi'an Pulse Reactor water purifying system.The exchange performance variations of used resins and the contributions from different factors to the variation were discussed.Based on the obtained information of the impurities in the used resin, the contamination state of the water in the Xi'an Pulse Reactor water pool, the corrosion state of the structural material in the reactor was presented. The spent anion resin almost completely losses its exchange performance,while the remaining exchange capacity in the spent cation resin is still high.The radiation field from the reactor operation contributes little to the degradation of the performance of the resins. The exchange capacity loss of the spent anion resin is due to the exchange of its active groups into abundant carbonate and a certain amount of organics. The impurity amount in the anion and cation exchange resins is low,which suggests(that) the water in the Xi'an Pulse Reactor water pool is little contaminated. A certain extent of corrosion is occurred on the structural material in the swimming pool of the reactor. The results provide important referential data for the operational safety of the water purifying system of similar research reactor. (authors)

  5. RA Reactor

    International Nuclear Information System (INIS)

    1989-01-01

    This chapter includes the following: General description of the RA reactor, organization of work, responsibilities of leadership and operators team, regulations concerning operation and behaviour in the reactor building, regulations for performing experiments, regulations and instructions for inserting samples into experimental channels [sr

  6. Sustainable operations in nuclear research reactors. A bibliographical study

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Rodrigues de Aquino, Afonso; Marotti de Mello, Adriana; Tromboni de Souza Nascimento, Paulo

    2017-01-01

    Sustainability is gaining prominence in the area of operations management. By means of a bibliographical research, we identified in literature sustainable operations carried out by operating organizations of nuclear research reactors. The methodology applied consisted in gathering material, descriptive analysis, selection of analytical categories and evaluation of the material collected. The collection of material was performed by a search made on academic and nuclear databases, with keywords structured for the subject of the research. The collected material was analysed and analytical categories on the theme sustainable operations were established. The evaluation of the collected material resulted in references accepted for the study, classified according to the pre-established analytical categories. The results were significant. From then on, a theoretical review on the topic under study was structured, based on pre-defined analytical categories. Thus, we were able to identify gaps in the literature and propose new studies on the subject.

  7. Sustainable operations in nuclear research reactors. A bibliographical study

    Energy Technology Data Exchange (ETDEWEB)

    Kibrit, Eduardo; Rodrigues de Aquino, Afonso [Cidade Univ., Sao Paolo (Brazil). Inst. de Pesquisas Energeticas e Nucleares; Marotti de Mello, Adriana [Sao Paolo Univ. (Brazil). Faculdade de Economia; Tromboni de Souza Nascimento, Paulo [Sao Paolo Univ. (Brazil). Faculdade de Economia Administracao e Contabilidade

    2017-10-15

    Sustainability is gaining prominence in the area of operations management. By means of a bibliographical research, we identified in literature sustainable operations carried out by operating organizations of nuclear research reactors. The methodology applied consisted in gathering material, descriptive analysis, selection of analytical categories and evaluation of the material collected. The collection of material was performed by a search made on academic and nuclear databases, with keywords structured for the subject of the research. The collected material was analysed and analytical categories on the theme sustainable operations were established. The evaluation of the collected material resulted in references accepted for the study, classified according to the pre-established analytical categories. The results were significant. From then on, a theoretical review on the topic under study was structured, based on pre-defined analytical categories. Thus, we were able to identify gaps in the literature and propose new studies on the subject.

  8. Performance and safety design of the advanced liquid metal reactor

    International Nuclear Information System (INIS)

    Berglund, R.C.; Magee, P.M.; Boardman, C.E.; Gyorey, G.L.

    1991-01-01

    The Advanced Liquid Metal Reactor (ALMR) program led by General Electric is developing, under U.S. Department of Energy sponsorship, a conceptual design for an advanced sodium-cooled liquid metal reactor plant. This design is intended to improve the already excellent level of plant safety achieved by the nuclear power industry while at the same time providing significant reductions in plant construction and operating costs. In this paper, the plant design and performance are reviewed, with emphasis on the ALMR's unique passive design safety features and its capability to utilize as fuel the actinides in LWR spent fuel

  9. Operational performance of the development of a 15 kW parabolic trough mid-temperature solar receiver/reactor for hydrogen production

    International Nuclear Information System (INIS)

    Hong, Hui; Liu, Qibin; Jin, Hongguang

    2012-01-01

    Highlights: ► A 15 kW solar chemical receiver/reactor for hydrogen production was developed. ► The solar thermochemical efficiency of the receiver/reactor was in the range of 20–28%. ► Hydrogen production exceeding 80% was achieved. ► The research results extend the application of mid-temperature solar thermal energy. -- Abstract: In this paper, we report the operational performance and energy conversion efficiency of a developed 15 kW solar chemical receiver/reactor for hydrogen production. A concentrated solar heat of around 200–300 °C was utilized to provide process heat to drive methanol steam reforming. A modified 15 kW direct-irradiation solar reactor coupled with a linear receiver positioned along the focal line of a one-axis parabolic trough concentrator was used. The experiments were conducted from 200 to 300 °C under a mean solar flux of 300–800 W/m 2 and a reactant feeding rate of 6 kg/h. Reactants were continuously fed, and the attained conversion rate of methanol was more than 70% at 700 W/m 2 . The typical solar thermochemical efficiency of solar thermal energy converted into chemical energy was in the 20–28% range. The overall energy efficiency of input solar power conversion into chemical energy reached up to 17% and may be further increased by improving solar field efficiency. Hydrogen production exceeding 80% was achieved. In addition, preliminary economic evaluation was performed, and methods for further improvement were proposed. This paper proves that solar hydrogen production is feasible by combining solar thermal energy with alternative fuel at around 200–300 °C, which is much lower than the temperature of other solar thermochemical processes. This may offer an economic approach to solar fuel production and extend the application of mid-temperature solar thermal energy.

  10. Operation and Performance of the Supercritical Fluids Reactor (SFR)

    National Research Council Canada - National Science Library

    Hanush, R

    1996-01-01

    The Supercritical Fluids Reactor (SFR) at Sandia National Laboratories, CA has been developed to examine and solve engineering, process, and fundamental chemistry issues regarding the development of supercritical water oxidation (SCWO...

  11. Report on the operation in 1973 of the FR 2 research reactor

    International Nuclear Information System (INIS)

    Moeller, I.; Steiger, W.

    1975-04-01

    Also in 1973, the heavy-water moderated research and testing reactor FR 2 was operated to schedule at 44 MW nominal power. Again, the availability of the plant was slightly improved. Experimental utilization through instrumented irradiation capsules strongly increased as compared to the previous year. Up to 16 capsule test rigs at a time were inserted in the reactor. As to the beam tube experiments, up to 13 experiments covering a total of 18 test rigs were conducted simultaneously at the 12 reasonably usable beam holes. At the beginning of the year all of the positions available were occupied by 5 loop experiments. Isotope production reached its highest value with a total of 2,372 irradiated capsules (1.3% more than the year before). Some remarkable figures characterized the year 1973: On August 16, 1973 ten years of full power operation at a nominal power of 12 and 44 MW, respectively, had been reached. On July 24, 1973 the 50,000th isotope irradiation was performed in the reactor and on December 26, 1973 a total energy release of 100,000 MWd was recorded. Moreover, the 125,000th visitor of the reactor was welcomed on December 6, 1973. (orig./UA) [de

  12. Reactor operations for nuclear pumping of lasers

    Energy Technology Data Exchange (ETDEWEB)

    Beck, G; Cooper, G [University of Illinois (United States)

    1974-07-01

    Experiments involving the measurement of gas parameters that are related to lasing, and lasing of various gas mixtures have comprised a major part of the utilization of the University of Illinois Advanced TRIGA Reactor since the upgrading of the facility was completed in 1969. A thru beam port, which was added during upgrading, has been the facility used for these measurements. The laser cell is placed in the port adjacent to the core. Alignment is then accomplished by using both ends of the port or by a mirror placed at the back side of the apparatus. The reactor has been operated in all modes (pulsing, square wave, and steady state) for the experiments although pulsing is the primary mode that is used. Laser enhancement has been obtained in several cases, but efforts toward direct pumping from the radiation alone have not as yet succeeded. Improved laser operation from direct pumping has been suggested with an emphasis on high-powered systems where the basic input energy is to be derived from a nuclear reactor.

  13. Operational and passive safety aspects of the STAR-LM natural convection HLMC reactor. Study on operational aspects of a natural circulation HLMC reactor. 2

    International Nuclear Information System (INIS)

    Sienicki, J.J.; Petkov, P.V.

    2001-09-01

    The concept of a heavy liquid metal cooled fast reactor that achieves 100+% natural circulation heat removal from the core has the potential to attain improved cost competitiveness through extreme simplification, proliferation resistance, and heightened passive safety. The concept offers the potential for simplifications in plant control strategies wherein inherent reactor feedbacks may restore balance between energy release and heat removal from the reactor during operation as well as providing passive reactivity shutdown in the event of transients involving failure to scram. This study was initiated to evaluate the operational characteristics of the 100+% natural circulation reactor under normal and transient states using a plant dynamics analysis computer code and to seek design and operational optimization of the concept. In the earlier Phase 1 of the project, the stage for the overall study was prepared. A coupled thermal hydraulics-kinetics plant dynamics analysis code was developed that has the capabilities to calculate operational and accident transients. Code input was prepared for the heavy liquid metal cooled natural circulation reactor concept. A preliminary analysis using the plant dynamics code and its input to calculate three illustrative cases relevant to initial startup, shutdown following long-term operation, and change-in-turbine load demonstrated the capability to analyze typical transient cases. The present second phase of the study involves documentation of the plant dynamics analysis computer code including major assumptions and thermal hydraulic equations as well as application of the code to calculate operational transients and postulated accidents. The following normal and accident scenarios are calculated: initial startup; normal shutdown; startup from hot standby; decrease-in-turbine load; increase-in-turbine load; loss-of-heat sink without scram; overcooling event without scram; and unprotected transient overpower. For the decrease

  14. Safety challenges after the Fukushima accident for operated installations others than EDF reactors

    International Nuclear Information System (INIS)

    Sene, Monique; Rollinger, Francois; Lheureux, Yves; Lizot, Marie-Therese; Kerdelhue, M.; Py, M.E.; Leroyer, Veronique; Pultier, Marc; Kassiotis, Christophe; Chambrette, Pierre; Devaux, Pascal; Baron, Yves; Collinet, Jacques

    2013-12-01

    This document contains Power Point presentations which, within the perspective created by the Fukushima accident, address various aspects of safety issues for installations other than currently operated EDF reactors. These contributions propose: an agenda of additional safety assessments (ECS) performed on these installations and an examination of responses made to prescriptions made on the 16 June 2012; a presentation by the IRSN of ECS performed in Areva plants; a presentation by Areva of arrangements related to these ECS; a presentation of the Manche local information commissions (CLI) and a presentation of their approach according to a white paper for the safety of civil nuclear installations located in the Manche department; a presentation by the IRSN on ECS concerning various basic nuclear installations such as laboratories, experimental reactors and stopped reactors; a presentation by the CEA of ECS of its installations (context, approach, execution and conclusions); a presentation by the ANCCLI about ASN decision and decision projects about the hard core according to ECS (example of the High flux reactor in the ILL in Grenoble)

  15. China: EDF's feedback experience of reactor operating is essential to win international markets

    International Nuclear Information System (INIS)

    Maillart, H.

    2016-01-01

    The main assets of EDF on the Chinese nuclear power market is first, its very important feedback experience of reactor operations (EDF cumulates one year of reactor operations every week due to its fleet of 58 reactors), secondly the cooperation with China allowed China to enter nuclear energy in 1983 with the construction of the Daya Bay plant and now to develop its own technology: the CPR-1000 reactor. China is the world leader in terms of nuclear market dynamism with 30 reactors in operation, 24 reactors being built and 40 others planned. A new stage in the Franco-China cooperation would be to share relevant good practices in the managing of both French and Chinese fleets of reactors. EDF has upgraded its commercial international offer, it now proposes to cover all the stages of the nuclear power plant from site selection to plant deconstruction via construction, operation, maintenance and waste management which constitutes a commitment over a 100 year period. (A.C.)

  16. The influence of fast reactor emergency conditions upon fuel element performance

    International Nuclear Information System (INIS)

    Bagdasarov, Yu.E.; Buksha, Yu.K.; Zabudko, L.M.; Likhachev, Yu.I.

    1985-01-01

    Fuel-pin cladding is one of the most important protective barriers preventing the release and propagation of radioactive contamination. By now the calculated determination of fast-reactor fuel-element performance under stationary conditions has been considered in detail but the investigation of the influence of emergency conditions has been given less attention. Under emergency conditions of the fast reactor operation there arise short-duration excesses of rated parameters (temperature, energy release, etc.) which are confined within tolerable limits with the use of the safety system. Some features of the sodium-cooled fast reactors (small mean prompt-neutron lifetime, relatively weak reactivity feedback, etc.) complicate the work of safety systems. Therefore, the tolerable deviations of parameters should be carefully validated

  17. A series of lectures on operational physics of power reactors

    International Nuclear Information System (INIS)

    Mohanakrishnan, P.; Rastogi, B.P.

    1982-01-01

    This report discusses certain aspects of operational physics of power reactors. These form a lecture series at the Winter College on Nuclear Physics and Reactors, Jan. - March 1980, conducted at the International Centre for Theoretical Physics, Trieste, Italy. The topics covered are (a) the reactor physics aspects of fuel burnup (b) theoretical methods applied for burnup prediction in power reactors (c) interpretation of neutron detector readings in terms of adjacent fuel assembly powers (d) refuelling schemes used in power reactors. The reactor types chosen for the discussion are BWR, PWR and PHWR. (author)

  18. Operating experience feedback from safety significant events at research reactors

    Energy Technology Data Exchange (ETDEWEB)

    Shokr, A.M. [Atomic Energy Authority, Abouzabal (Egypt). Egypt Second Research Reactor; Rao, D. [Bhabha Atomic Research Centre, Mumbai (India)

    2015-05-15

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  19. Operating experience feedback from safety significant events at research reactors

    International Nuclear Information System (INIS)

    Shokr, A.M.

    2015-01-01

    Operating experience feedback is an effective mechanism to provide lessons learned from the events and the associated corrective actions to prevent recurrence of events, resulting in improving safety in the nuclear installations. This paper analyzes the events of safety significance that have been occurred at research reactors and discusses the root causes and lessons learned from these events. Insights from literature on events at research reactors and feedback from events at nuclear power plants that are relevant to research reactors are also presented along with discussions. The results of the analysis showed the importance of communication of safety information and exchange of operating experience are vital to prevent reoccurrences of events. The analysis showed also the need for continued attention to human factors and training of operating personnel, and the need for establishing systematic ageing management programmes of reactor facilities, and programmes for safety management of handling of nuclear fuel, core components, and experimental devices.

  20. Report on operation, utilization and technical development of research reactors and hot laboratory

    International Nuclear Information System (INIS)

    1980-03-01

    Activities of the Division of Research Reactor Operation in fiscal 1978 are described. The division is responsible for operation and maintenance of JRR-2, JRR-3, JRR-4 and Hot Laboratory. In the above connection, various other works are performed, including technical management of fuel and coolant, radiation control, irradiation technique, etc. In Hot Laboratory, postirradiation examinations of fuels and materials are made, and also development of examination methods. (author)

  1. Report on operation utilization and technical development of research reactors and hot laboratory

    International Nuclear Information System (INIS)

    1982-03-01

    Activities of the Division of Research Reactor Operation in fiscal 1980 are described. The division is responsible for operation and maintenance of JRR-2, JRR-3, JRR-4 and Hot Laboratory. In the above connection, various other works are performed, including technical management of fuel and coolant, radiation control, irradiation technique, etc. In Hot Laboratory, postirradiation examinations of fuels and materials are made, and also development of examination methods. (author)

  2. Report on operation, utilization and technical development of Research Reactors and Hot Laboratory

    International Nuclear Information System (INIS)

    1984-10-01

    Activities of the Division of Research Reactor Operation in fiscal 1981 are described. The division is responsible for operation and maintenance of JRR-2, JRR-3, JRR-4 and Hot Laboratory. In the above connection, various other works are performed, including technical management of fuel and coolant, radiation control, irradiation technique, etc. In Hot Laboratory, postirradiation examinations of fuels and materials are made, and also development of examination methods. (author)

  3. Operating manual for the High Flux Isotope Reactor. Description of the facility

    Energy Technology Data Exchange (ETDEWEB)

    None

    1965-06-01

    This report contains a comprehensive description of the High Flux Isotope Reactor facility. Its primary purpose is to supplement the detailed operating procedures, providing the reactor operators with background information on the various HFIR systems. The detailed operating procedures are presented in another report.

  4. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1984-01-01

    During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE Boiling Water Reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of senior reactor operator (SRO) experience, operating crew augmentation with an STA and practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. Sixteen two-man crews of licensed operators were employed in a 2 x 2 factorial design. The SROs leading the crews were split into high and low experience groups on the basis of their years of experience as an SRO. One half of the high- and low-SRO experience groups were assisted by an STA. The crews responded to four simulated plant casualties. A five-variable set of content-referenced performance measures was derived from task analyses of the procedurally correct responses to the four casualties. System parameters and control manipulations were recorded by the computer controlling the simulator. Data on communications and procedure use were obtained from analysis of videotapes of the exercises. Questionnaires were used to collect subject biographical information and data on subjective workload during each simulated casualty. For four of the five performance measures, no significant differences were found between groups led by high (25 to 114 months) and low (1 to 17 months as an SRO) experience SROs. However, crews led by low experience SROs tended to have significantly shorter task performance times than crews led by high experience SROs. The presence of the STA had no significant effect on overall team performance in responding to the four simulated casualties. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator

  5. Feedback from dismantling operations (level 2) on EDF's first generation reactors

    International Nuclear Information System (INIS)

    West, J P.; Dionisio-Gomes, A.; Kus, J P.; Mervaux, P.; Bernet, P.; Dalmas, R.

    2003-01-01

    EDF's policy as regards the dismantling of the reactors that have ceased commercial operation, namely the eight power plants of the first generation and the Creys-Malville power plant, is explained. Generally speaking, prior to the year 2001, EDF had opted for the de-construction of these power plants to comply with a 'long wait' scenario, which consisted of waiting for a period of 5 to 10 years to achieve IAEA level 2 (partial release of the site), then postponing the total de-construction of the facilities for 25 to 50 years. Today, EDF has decided to undertake the total de-construction of these reactors, which have ceased commercial operation, over a period of 25 years. The purpose of this document is to present: - The reactors concerned, their background and their 'regulatory' situation, - The main operations performed and/or currently in progress, - The main elements of feedback from such operations, shedding light on the approach adopted in 2001. The installations concerned by the de-construction programme are as follows: - The 8 power plants of the first generation, which were built during the fifties and sixties and ceased commercial operation between 1973 and 1994, namely: Brennilis (industrial prototype using heavy water technology, jointly operated by EDF and CEA), the 6 power units of the NUGG type (natural uranium gas graphite) at Chinon, Saint-Laurent des Eaux and Bugey and the PWR reactor at Chooz A, - The storage silos at Saint-Laurent, where the sleeves for the fuel assemblies of reactors SLA1 and SLA2 are stored, corresponding to approximately 2000 tonnes of graphite, - The Creys-Malville reactor, FBR (fast breeder reactor) shut down in accordance with a government decision, which is currently undergoing decommissioning. At the current stage, our feedback from the dismantling operations carried out on nuclear facilities is based on (i) the work carried out or in progress that will make it possible to achieve the equivalent of IAEA level 2 in the

  6. Operational margin monitoring system for boiling water reactor power plants

    International Nuclear Information System (INIS)

    Fukutomi, S.; Takigawa, Y.

    1992-01-01

    This paper reports on an on-line operational margin monitoring system which has been developed for boiling water reactor power plants to improve safety, reliability, and quality of reactor operation. The system consists of a steady-state core status prediction module, a transient analysis module, a stability analysis module, and an evaluation and guidance module. This system quantitatively evaluates the thermal margin during abnormal transients as well as the stability margin, which cannot be evaluated by direct monitoring of the plant parameters, either for the current operational state or for a predicted operating state that may be brought about by the intended operation. This system also gives operator guidance as to appropriate or alternate operations when the operating state has or will become marginless

  7. Operation of the SLOWPOKE-2 reactor in Jamaica

    Energy Technology Data Exchange (ETDEWEB)

    Grant, C.N.; Lalor, G.C.; Vuchkov, M.K. [University of the West Indies, Kingston (Jamaica)

    2001-07-01

    Over the past sixteen years lCENS has operated a SLOWPOKE 2 nuclear reactor almost exclusively for the purpose of neutron activation analysis. During this period we have adopted a strategy of minimum irradiation times while optimizing our output in an effort to increase the lifetime of the reactor core and to maintaining fuel integrity. An inter-comparison study with results obtained with a much larger reactor at IPEN has validated this approach. The parameters routinely monitored at ICENS are also discussed and the method used to predict the next shim adjustment. (author)

  8. Current status of operation and utilization of the Dalat Research Reactor

    International Nuclear Information System (INIS)

    Nguyen Nhi Dien

    2006-01-01

    The Dalat Nuclear Research Reactor (DNRR) is a 500 kW pool-type reactor using the Soviet VVR-M2 fuel assembly with 36% enrichment of U-235. It was renovated and upgraded from the USA 250 kW TRIGA Mark-II reactor. The first criticality of the renovated reactor was in November 1983 and its regular operation at nominal power of 500 kW has been since March 1984. The DNRR is operated mainly in continuous runs of 100 hrs, once every 4 weeks, for radioisotope production, neutron activation analysis, scientific research and training. The remaining time between two continuous runs is devoted to maintenance activities and also to short run for reactor physics and thermal hydraulics experiments. From the first start-up to the end of December 2003, it totaled about 26,000 hrs of operation and the total energy released was about 515 MWd. After 10 years of operation with the core of 89-fuel assembly configuration, in April 1994, the first refueling work was done and the 100-fuel assembly configuration was set-up. The second fuel reloading was executed in March 2002. At present time, the working configuration of the reactor core consists of 104 fuel assemblies. The next fuel reloading has been planned at the end of 2004. The current status of operation and utilization of the DNRR is presented and discussed in this paper. (author)

  9. Comparison of performance indicators of different types of reactors based on ISOE database

    International Nuclear Information System (INIS)

    Janzekovic, H.; Krizman, M.

    2005-01-01

    The optimisation of the operation of a nuclear power plant (NPP) is a challenging issue due to the fact that besides general management issues, a risk associated to nuclear facilities should be included. In order to optimise the radiation protection programmes in around 440 reactors in operation with more than 500 000 monitored workers each year, the international exchange of performance indicators (PI) related to radiation protection issues seems to be essential. Those indicators are a function of a type of a reactor as well as the age and the quality of the management of the reactor. in general three main types of radiation protection PI could be recognised. These are: occupational exposure of workers, public exposure and management of PI related to radioactive waste. The occupational exposure could be efficiently studied using ISOC database. The dependence of occupational exposure on different types of reactors, e.g. PWR, BWR, are given, analysed and compared. (authors)

  10. An analysis of fast reactor fuel assembly performance taking into account their mechanical interaction in the core and refuelling line capabilities

    International Nuclear Information System (INIS)

    Buksha, Yu.K.; Zabudko, L.M.; Kravchenko, I.N.; Matveenko, L.V.; Meshkov, M.N.

    1984-01-01

    An approach to assessment of fast reactor fuel assembly performance has been considered. A concept of passive restraint of fuel assemblies in a reactor adopted in the USSR is described. Some methods for calculating the interassembly interactions during operation are briefly outlined, some calculated results are presented. A problem of fuel assembly performance during refuelling taking into account the refuelling line capabilities is considered. Some results from fuel assemblies operation experience in the BN-600 reactor are given. (author)

  11. Description of the french graphite reactor and of the experiments performed in 1956

    International Nuclear Information System (INIS)

    Bussac, J.; Leduc, C.; Zaleski, C.P.

    1957-01-01

    This paper is an introduction to the experiments performed on the G1 reactor, experiments fully described in the papers following (670 'B to P'). The main results are given together with some comments. The neutronic parameters of the core, a description of the most important structures, and a few words of the tests leading to normal operation of the reactor under load complete our survey. (author) [fr

  12. Performance testing of refractory alloy-clad fuel elements for space reactors

    International Nuclear Information System (INIS)

    Dutt, D.S.; Cox, C.M.; Karnesky, R.A.; Millhollen, M.K.

    1985-01-01

    Two fast reactor irradiation tests, SP-1 and SP-2, provide a unique and self-consistent data set with which to evaluate the technical feasibility of potential fuel systems for the SP-100 space reactor. Fuel pins fabricated with leading cladding candidates (Nb-1Zr, PWC-11, and Mo-13Re) and fuel forms (UN and UO 2 ) are operated at temperatures typical of those expected in the SP-100 design. The first US fast reactor irradiated, refractory alloy clad fuel pins, from the SP-1 test, reached 1 at. % burnup in EBR-II in March 1985. At that time selected pins were discharged for interim examination. These examinations confirmed the excellent performance of the Nb-1Zr clad uranium oxide and uranium nitride fuel elements, which are the baseline fuel systems for two SP-100 reactor concepts

  13. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-12-01

    During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation [sr

  14. Reactor performance calculations for water reactors

    International Nuclear Information System (INIS)

    Hicks, D.

    1970-04-01

    The principles of nuclear, thermal and hydraulic performance calculations for water cooled reactors are discussed. The principles are illustrated by describing their implementation in the UKAEA PATRIARCH scheme of computer codes. This material was originally delivered as a course of lectures at the Technical University of Helsinki in Summer of 1969.

  15. FREC-4A: a computer program to predict fuel rod performance under normal reactor operation

    International Nuclear Information System (INIS)

    Harayama, Yasuo; Izumi, Fumio

    1981-10-01

    The program FREC-4A (Fuel Reliability Evaluation Code-version 4A) is used for predicting fuel rod performance in normal reactor operation. The performance is calculated in accordance with the irradiation history of fuel rods. Emphasis is placed on the prediction of the axial elongation of claddings induced by pellet-cladding mechanical interaction, including the influence of initially preloaded springs inserted in fuel rod lower plenums. In the FREC-4A, an fuel rod is divided into axial segments. In each segment, it is assumed that the temperature, stress and strain are axi-symmetrical, and the axial strain in constant in fuel pellets and in a cladding, though the values in the pellets and in the cladding are different. The calculation of the contact load and the clearance along the length of a fuel rod and the stress and strain in each segment is explained. The method adopted in the FREC-4A is simple, and suitable to predict the deformation of fuel rods over their full length. This report is described on the outline of the program, the method of solving the stiffness equations, the calculation models, the input data such as irradiation history, output distribution, material properties and pores, the printing-out of input data and calculated results. (Kako, I.)

  16. Experiment on continuous operation of the Brazilian IEA-R1 research reactor

    International Nuclear Information System (INIS)

    Freitas Pintaud, M. de

    1994-01-01

    In order to increase the radioisotope production in the IEA-R1 research reactor at IPEN/CNEN-SP, it has been proposed a change in its operation regime from 8 hours per day and 5 days per week to continuous 48 hours per week. The necessary reactor parameters for this new operation regime were obtained through an experiment in which the reactor was for the first time operated in the new regime. This work presents the principal results from this experiment: xenon reactivity, new shutdown margins, and reactivity loss due to fuel burnup in the new operation regime. (author)

  17. Experiences with loss of natural circulation events, performed experiments, analysis, computations and development of operational documents

    International Nuclear Information System (INIS)

    Nagy, L.; Varju, A.; Nagy, S.

    1996-01-01

    The refuelling of the unit 4 was started on 18 June, 1988. At the time of the event the reactor was in cold shutdown state, with atmospheric pressure, the reactor head was removed. On June 30 the operational personnel performed a planned switch over of natural circulation from loops 4, 6 to loops 1, 3. In the meantime the effectiveness of the core cooling by natural circulation decreased sharply for about 3 hour-period. After switching over the natural circulation among the loops the operating personnel isolated the loops 4., 6. and started to drain them. Nitrogen used to drain the loops was unintentionally injected into the loops in operation and large amount of primary coolant was pushed out from the SG primary side to the reactor vessel. The operators tried to stop the disturbance of natural circulation by starting the booster pump of make-up system periodically to the working loops. During this injection the personnel performed venting few times to take away the gas-air mixture from the top of the SG primary headers. After all the restoration of the natural circulation was achieved by continuous venting the SG headers. During 1993 annual refuelling outage of Unit 2 at Paks NPP a deterioration of natural circulation in reactor coolant system occurred. A special maintenance task was being performed to repair the cladding of the sealing bellows between the reactor vessel and reactor cavity

  18. Simulator experiments: effects of NPP operator experience on performance

    International Nuclear Information System (INIS)

    Beare, A.N.; Gray, L.H.

    1985-01-01

    Experiments are being conducted on nuclear power plant (NPP) control room training simulators by the Oak Ridge National Laboratory, its subcontractor, General Physics Corporation, and participating utilities. The experiments are sponsored by the Nuclear Regulatory Commission's (NRC) Human Factors and Safeguards Branch, Division of Risk Analysis and Operations, and are a continuation of prior research using simulators, supported by field data collection, to provide a technical basis for NRC human factors regulatory issues concerned with the operational safety of nuclear power plants. During the FY83 research, a simulator experiment was conducted at the control room simulator for a GE boiling water reactor (BWR) NPP. The research subjects were licensed operators undergoing requalification training and shift technical advisors (STAs). This experiment was designed to investigate the effects of (a) senior reactor operator (SRO) experience, (b) operating crew augmentation with an STA and (c) practice, as a crew, upon crew and individual operator performance, in response to anticipated plant transients. The FY84 experiments are a partial replication and extension of the FY83 experiment, but with PWR operators and simulator. Methodology and results to date are reported

  19. Multilayer robust control for safety enhancement of reactor operations

    International Nuclear Information System (INIS)

    Edwards, R.M.; Lee, K.Y.; Ray, A.

    1991-01-01

    A novel concept of reactor power and temperature control has been recently reported in which a conventional output feedback controller is embedded within a state feedback setting. The embedded output feedback controller at the inner layer largely compensates for plant modeling uncertainties and external disturbances, and the outer layer generates an optimal control signal via feedback of the estimated plant states. A major advantage of this embedded architecture is the robustness of the control system relative to parametric and nonparametric uncertainties and thus the opportunity for designing fault-accommodating control algorithms to improve reactor operations and plant safety. The paper illustrates the architecture of the state-feedback-assisted classical (SFAC) control, which utilizes an embedded output feedback controller designed via classical techniques. It demonstrates the difference between the performance of conventional state feedback control and SFAC by examining the sensitivity of the dominant eigenvalues of the individual closed-loop systems

  20. Analysis of the radiometric survey during the Argonauta reactor operation; Analise do levantamento radiometrico durante operacao do reator Argonauta

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Eara de S.L.; Cardozo, Katia K.M.; Silva, Joao Carlos P.; Santos, Joao Regis dos, E-mail: esluz@ien.gov.br, E-mail: cardozo@ien.gov.br, E-mail: jcarlos@ien.gov.br, E-mail: regis@ien.gov.br [Instituto de Engenharia Nuclear (CNEN-IEN/RJ), Rio de Janeiro - RJ (Brazil)

    2013-07-01

    The Argonaut reactor at the Institute of Nuclear Engineering-IEN/CNEN, operates normally, the powers between 1.7 and 340 W on neutrongraphy procedures, production of radionuclides and experimental reactor physics lessons to postgraduate courses. The doses from neutrons and gamma radiation are measured when the reactor is critical, inside the reactor hall and surrounding regions. A study of the data obtained was performed to evaluate the daily need of this survey in the reactor hall. Taking into account the principle ALARA, which aims to optimize and minimize the dose received by the individual, we propose, in this work, through an analysis of the acquired data in occupational radiometric surveys, a reformulation of the area monitoring routine practiced by the team of radiological protection of the Institute of Nuclear Engineering - IEN/CNEN-RJ, whereas other monitoring routines regarding the radiological protection are also applied in the routine of the reactor. The operations under review occurred with the reactor operating 340 W power at intervals of 60, 120 and 180 minutes, in monitoring points in controlled areas, supervised and free. The results showed significant dose values in the output of the J-Channel 9 when the operation occurs with this open. With 180 minutes of operation, the measured values of dose rate were lower than the values at 60 min and 120 operations min. At the point in the supervised area, offsite to the reactor hall, situated in the direction of the J-Channel 9, the value reduces more than 14% in any operating time in relation to the dose rate measured at the point opposite the canal. There is a 50% reduction in the dose rates for operations with and J-9 closed. The results suggest a new frequency of radiometric survey whose mode of operation is maintained in similar conditions, since combined with other relevant practices of radiation protection.

  1. Modifications in the operational conditions of the IEA-R1 reactor under continuous 48 hours operation

    International Nuclear Information System (INIS)

    Moreira, Joao Manoel Losada; Frajndlich, Roberto

    1995-01-01

    This work shows the required changes in the IEA-R1 reactor for operation at 2 Mw, 48 hours continuously. The principal technical change regards the operating conditions of the reactor, namely, the required excess reactivity which now will amount to 4800 pcm in order to compensate the Xe poisoning at equilibrium at 2 Mw. (author). 6 refs, 1 fig, 1 tab

  2. Knowledge-Based operation planning system for boiling water reactors

    International Nuclear Information System (INIS)

    Tatsuya Iwamoto; Shungo Sakurai; Hitoshi Uematsu; Makoto Tsuiki

    1987-01-01

    A knowledge-Based Boiling Water Reactor operation planning system was developed to support core operators or core management engineers in making core operation plans, by automatically generating suboptimum core operation procedures. The procedures are obtained by searching a branching tree of the possible core status (nodes) and the elementary operations to change the core status (branches). A path that ends at the target node, and contains only operationally feasible nodes can be a candidate of the solution. The core eigenvalue, the power distribution and the thermal limit parameters at key points are calculated by running a three-dimensional (3-D) BWR core physics simulator to examine the feasibility of the nodes and the performance of candidates. To obtain a practically acceptable solution within a reasonable time rather than making a time-consuming effort to get the optimum one, the Depth-First-Search method, together with the heuristic branch-bounding, was used to search the branching tree. The system was applied to actual operation plannings with real plant data, and gave satisfactory results. It can be concluded that the system can be applied to generate core operation procedures as a substitute for core management experts

  3. Simulator platform for fast reactor operation and safety technology demonstration

    International Nuclear Information System (INIS)

    Vilim, R.B.; Park, Y.S.; Grandy, C.; Belch, H.; Dworzanski, P.; Misterka, J.

    2012-01-01

    A simulator platform for visualization and demonstration of innovative concepts in fast reactor technology is described. The objective is to make more accessible the workings of fast reactor technology innovations and to do so in a human factors environment that uses state-of-the art visualization technologies. In this work the computer codes in use at Argonne National Laboratory (ANL) for the design of fast reactor systems are being integrated to run on this platform. This includes linking reactor systems codes with mechanical structures codes and using advanced graphics to depict the thermo-hydraulic-structure interactions that give rise to an inherently safe response to upsets. It also includes visualization of mechanical systems operation including advanced concepts that make use of robotics for operations, in-service inspection, and maintenance.

  4. Simulator platform for fast reactor operation and safety technology demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Vilim, R. B.; Park, Y. S.; Grandy, C.; Belch, H.; Dworzanski, P.; Misterka, J. (Nuclear Engineering Division)

    2012-07-30

    A simulator platform for visualization and demonstration of innovative concepts in fast reactor technology is described. The objective is to make more accessible the workings of fast reactor technology innovations and to do so in a human factors environment that uses state-of-the art visualization technologies. In this work the computer codes in use at Argonne National Laboratory (ANL) for the design of fast reactor systems are being integrated to run on this platform. This includes linking reactor systems codes with mechanical structures codes and using advanced graphics to depict the thermo-hydraulic-structure interactions that give rise to an inherently safe response to upsets. It also includes visualization of mechanical systems operation including advanced concepts that make use of robotics for operations, in-service inspection, and maintenance.

  5. Study on Operator Actions during the Occurrences of Undesirable Events in PUSPATI TRIGA Reactor

    International Nuclear Information System (INIS)

    Tom, P.P.; Nurul Husna Zainal Abidin; Lanyau, T.A.; Zaredah Hashim

    2016-01-01

    Due to the recent Fukushima accident, the potential risks at one and only nuclear research reactor in the country, which is the PUSPATI TRIGA Reactor (RTP), has increasingly gain concerns and an attempt on the development of Level 1 Probabilistic Safety Assessment (PSA) for this reactor has been commenced. The preliminary scope of the PSA is to analyse the risk of core degradation during normal daily operation due to the random component failure and human error. SPAR-H and THERP method is used for quantifying human error probability (HEP). However, the scopes of this study only cover the qualitative parts that use interview/questionnaire method. The objectives of the questionnaire are to identify the main action for RTP operators when any undesired incident occurs during full power operation that might be caused by random component failures. From the questionnaires that have been conducted, the respondents consisted of 4 licensed operators and 9 trainee operators. All licensed operators have experience of operating reactor for more than 15 years while the trainee operator have been operate the reactor with experience of less than 10 years. Generally, in the event of an abnormal condition involving the reactor, an operator whether a licensed operator or the trainee does not have to ask permission in advance from the top individuals to carry out scram. This is to prevent the situation becoming increasingly severe if the reactor is still operating. With complete training and knowledge derived from the management, an operator can act efficiently in any emergency case. (author)

  6. Knowledge and abilities catalog for nuclear power plant operators: Pressurized water reactors. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This document provides the basis for the development of content-valid licensing examinations for reactor operators and senior reactor operators. The examinations developed using the PWR catalog will cover those topics listed under Title 10, (ode of Federal Regulations Part 55. The PWR catalog contains approximately 5100 knowledge and ability (K/A) statements for reactor operators and senior reactor operators. The catalog is organized into six major sections: Catalog Organization; Generic Knowledge and Abilities; Plant Systems; Emergency and Abnormal Plant Evolutions; Components and Theory.

  7. Knowledge and abilities catalog for nuclear power plant operators: Pressurized water reactors. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    This document provides the basis for the development of content-valid licensing examinations for reactor operators and senior reactor operators. The examinations developed using the PWR catalog will cover those topics listed under Title 10, (ode of Federal Regulations Part 55. The PWR catalog contains approximately 5100 knowledge and ability (K/A) statements for reactor operators and senior reactor operators. The catalog is organized into six major sections: Catalog Organization; Generic Knowledge and Abilities; Plant Systems; Emergency and Abnormal Plant Evolutions; Components and Theory

  8. Clustering methods and visualization algorithms to aid nuclear reactor operative diagnostics

    International Nuclear Information System (INIS)

    Pepelyshev, Yu.N.; Dzwinel, W.

    1990-01-01

    The software system developed plays the role of the aid to an operator for nuclear reactor diagnostics. The noise analysis of the reactor parameters such as power, temperature and coolant flow rate constitutes the basis of the system. Combination of data acquisition, data preprocessing, clustering and cluster visualization algorithms with heuristic techniques of results analysis, determine the way of its implementation. Two regimes are available. The first one - extended - is recommended for a long term investigations and the second - suppressed for the aid to the reactor operation monitoring. The system has been tested and developed at the JINR IBR-2 pulsed reactor. 13 refs.; 4 figs.; 2 tabs

  9. Steady-state operation requirements of tokamak fusion reactor concepts

    International Nuclear Information System (INIS)

    Knobloch, A.F.

    1991-06-01

    In the last two decades tokamak conceptual reactor design studies have been deriving benefit from progressing plasma physics experiments, more depth in theory and increasing detail in technology and engineering. Recent full-scale reactor extrapolations such as the US ARIES-I and the EC Reference Reactor study provide information on rather advanced concepts that are called for when economic boundary conditions are imposed. The ITER international reactor design activity concentrated on defining the next step after the JET generation of experiments. For steady-state operation as required for any future commercial tokamak fusion power plants it is essential to have non-inductive current drive. The current drive power and other internal power requirements specific to magnetic confinement fusion have to be kept as low as possible in order to attain a competitive overall power conversion efficiency. A high plasma Q is primarily dependent on a high current drive efficiency. Since such conditions have not yet been attained in practice, the present situation and the degree of further development required are characterized. Such development and an appropriately designed next-step tokamak reactor make the gradual realization of high-Q operation appear feasible. (orig.)

  10. Performance of a UASB reactor treating coffee wet wastewater

    International Nuclear Information System (INIS)

    Guardia Puebla, Yans; Rodríguez Pérez, Suyén; Janet Jiménez Hernández; Sánchez Girón, Víctor

    2014-01-01

    The present work shows the results obtained in the anaerobic digestion process of coffee wet wastewater processing. An UASB anaerobic reactor was operated in single-stage in mesophilic temperature controlled conditions (37±1ºC). The effect of both organic loading rate (OLR) and hydraulic retention time (HRT) in the anaerobic digestion of coffee wet wastewater was investigated. The OLR values considered in the single-stage UASB reactor varied in a range of 3,6-4,1 kgCOD m-3 d-1 and the HRT stayed in a range of 21,5-15,5 hours. The evaluation results show that the best performance of UASB reactor in single-stage was obtained at OLR of 3,6 kg COD m-3 d-1 with an average value of total and soluble COD removal of 77,2% and 83,4%, respectively, and average methane concentration in biogas of 61%. The present study suggests that the anaerobic digestion is suitable to treating coffee wet wastewater. (author)

  11. Performance Evaluation of Moving Bed Bio Film Reactor in Saline Wastewater Treatment

    Directory of Open Access Journals (Sweden)

    M Ahmadi

    2013-06-01

    Full Text Available Background and purpose:Moving Bed Biofilm Reactor is an aerobic attached growth with better biofilm thickness control, lack of plugging and lower head loss. Consequently, this system is greatly used by different wastewater treatment plants. High TDS wastewater produced petrochemical, leather tanning, sea food processing, cannery, pickling and dairy industries. The aim of this study was to evaluate the performance of MBBR in saline wastewater treatment. Materials and methods: In this study, 50 percent of a cylindrical reactor with 9.5 liter occupied media with 650 m2.m-3. In the first step, hydraulic regime was evaluated and startup reactor was done by sanitary sludge. Bio film was generated with glucose as the sole carbon source in synthetic wastewater. MBBR performance evaluation was performed in 6:30 and 8:45 with saline wastewater after bio film produced on media. Results: After 83 days of passing MBBR operation with saline wastewater containing 3000-12000 mg.L-1 TDS, organic loading rate of 2.2-3.5 kg/m3.d COD removal efficiency reached 80-92%. Conclusion: Moving bed biofilm reactor is effective in organic load elimination from saline wastewater.

  12. Classification of Reactor Facility Operational State Using SPRT Methods with Radiation Sensor Networks

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez Aviles, Camila A. [ORNL; Rao, Nageswara S. [ORNL

    2018-01-01

    We consider the problem of inferring the operational state of a reactor facility by using measurements from a radiation sensor network, which is deployed around the facility’s ventilation stack. The radiation emissions from the stack decay with distance, and the corresponding measurements are inherently random with parameters determined by radiation intensity levels at the sensor locations. We fuse measurements from network sensors to estimate the intensity at the stack, and use this estimate in a one-sided Sequential Probability Ratio Test (SPRT) to infer the on/off state of the reactor facility. We demonstrate the superior performance of this method over conventional majority vote fusers and individual sensors using (i) test measurements from a network of NaI sensors, and (ii) emulated measurements using radioactive effluents collected at a reactor facility stack. We analytically quantify the performance improvements of individual sensors and their networks with adaptive thresholds over those with fixed ones, by using the packing number of the radiation intensity space.

  13. Operation and maintenance of the RB reactor, Annual report for 1980

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.; Markovic, H.; Zivkovic, B.; Gogdanovic, M.; Petronijevic, M.

    1980-12-01

    This report includes data concerned with reactor operation and utilization, status of reactor components and equipment, refurbishment of the equipment, dosimetry and radiation protection, reactor staff, financing. It includes 9 Annexes as follows: Utilization of the RB reactor from 1976 - 1980; program of reactor utilization from 1981-1985; contents of the RB reactor safety report; maintenance of the reactor components and equipment in 1980; verification of reactor reliability after the earthquake (May 18 1980); refurbishment of equipment in 1980, and purchasing new equipment from 1981-1985; review of radiation doses in the reactor building and exposure doses for the reactor staff; personnel data and financial data

  14. Biogenic Hydrogen Conversion of De-Oiled Jatropha Waste via Anaerobic Sequencing Batch Reactor Operation: Process Performance, Microbial Insights, and CO2 Reduction Efficiency

    Directory of Open Access Journals (Sweden)

    Gopalakrishnan Kumar

    2014-01-01

    Full Text Available We report the semicontinuous, direct (anaerobic sequencing batch reactor operation hydrogen fermentation of de-oiled jatropha waste (DJW. The effect of hydraulic retention time (HRT was studied and results show that the stable and peak hydrogen production rate of 1.48 L/L*d and hydrogen yield of 8.7 mL H2/g volatile solid added were attained when the reactor was operated at HRT 2 days (d with a DJW concentration of 200 g/L, temperature 55°C, and pH 6.5. Reduced HRT enhanced the production performance until 1.75 d. Further reduction has lowered the process efficiency in terms of biogas production and hydrogen gas content. The effluent from hydrogen fermentor was utilized for methane fermentation in batch reactors using pig slurry and cow dung as seed sources. The results revealed that pig slurry was a feasible seed source for methane generation. Peak methane production rate of 0.43 L CH4/L*d and methane yield of 20.5 mL CH4/g COD were observed at substrate concentration of 10 g COD/L, temperature 30°C, and pH 7.0. PCR-DGGE analysis revealed that combination of celluloytic and fermentative bacteria were present in the hydrogen producing ASBR.

  15. Artificial Intelligence and its Reasonable Application Scenario to Reactor Operation

    International Nuclear Information System (INIS)

    Im, Ki Hong; Suh, Yong-Suk; Park, Cheol; Lim, In-Cheol

    2017-01-01

    This paper presents brief but reasonable scenarios for applying AI or machine learning technologies to research reactor from various perspectives. Two less safety critical scenarios for applying AI to reactor operation are introduced in this study. However, the AI assistant will not only be an assistant but it will also be an operator in the future. What is required is big operation data which can represent all the cases requiring operation decision, including normal operation and accident data as well, and enough time to train and fix the AI system with this data. We can predict AI study in this area can begin with a mild and safe application. But in the near future, this technology could be used to handle or automate more severe operations.

  16. Reverse flow operation with reactor side feeding : analysis, modeling and simulation

    NARCIS (Netherlands)

    Budhi, Y.W.; Hoebink, J.H.B.J.; Schouten, J.C.

    2004-01-01

    The novel concept of reverse flow operation with reactor side feeding is studied for selective oxidation of NH3 to produce either N2, N2O, or NO. During normal reverse flow operation, where the feeds are alternately introduced from either end of the reactor, the conversion is always lower when

  17. Ignition and time-dependent fractional power operation of tokamak reactors

    International Nuclear Information System (INIS)

    Vold, E.L.; Mau, T.K.; Conn, R.W.

    1986-01-01

    The eventual utilization of a tokamak fusion reactor for commercial power necessitates a thorough understanding of the operational requirements at full and fractional power levels and during transitions from one operating level to another. In this study we examine the role of burn control in maintaining the reactor plasma at equilibrium to avoid thermal runaway during fractional power operation. Because these requirements rely so heavily on the assumptions that govern the plasma transport, this study focuses on time-dependent analyses and a comparison of ignition requirements using a range of energy confinement

  18. Trickle bed reactor model to simulate the performance of commercial diesel hydrotreating unit

    Energy Technology Data Exchange (ETDEWEB)

    C. Murali; R.K. Voolapalli; N. Ravichander; D.T. Gokak; N.V. Choudary [Bharat Petroleum Corporation Ltd., Udyog Kendra (India). Corporate R& amp; D Centre

    2007-05-15

    A two phase mathematical model was developed to simulate the performance of bench scale and commercial hydrotreating reactors. Major hydrotreating reactions, namely, hydrodesulphurization, hydrodearomatization and olefins saturation were modeled. Experiments were carried out in a fixed bed reactor to study the effect of different process variables and these results were used for estimating kinetic parameters. Significant amount of feed vaporization (20-50%) was estimated under normal operating conditions of DHDS suggesting the importance of considering feed vaporization in DHDS modeling. The model was validated with plant operating data, under close to ultra low sulphur levels by correctly accounting for feed vaporization in heat balance relations and appropriate use of hydrodynamic correlations. The model could predict the product quality, reactor bed temperature profiles and chemical hydrogen consumption in commercial plant adequately. 14 refs., 7 figs., 6 tabs.

  19. The influence of Triga 2000 reactor operation on the surface contamination at reactor room using smear test method

    International Nuclear Information System (INIS)

    Bintu Khoiriyyah; Budi Purnama; Tri Cahyo Laksono

    2016-01-01

    The monitoring of surface contamination should be conducted to determine the safety of work areas. Surface contamination at the TRIGA 2000 reactor room which is on PSTNT-BATAN Bandung remain to be implemented although reactor not operating. In this research monitoring of surface contamination when TRIGA 2000 in operation of the first time after several years not operating aims to determine the influence on the results of monitoring. The monitoring of surface contamination has been done using smear test method at some predetermined in TRIGA 2000 reactor room. The highest surface contamination activities is obtained 0.32 Bq/cm 2 and there are some points that are not detected. Based on keputusan kepala BAPETEN No.1/Ka BAPETEN/ V/99 the work showed that the TRIGA 2000 reactor in the category of low area contamination, that is <3.7 Bq/cm 2 to gross beta. (author)

  20. Advantages of forced non-steady operated trickle-bed reactors

    NARCIS (Netherlands)

    Boelhouwer, J.G.; Piepers, H.W.; Drinkenburg, A.A.H.

    2002-01-01

    Trickle-bed reactors are usually operated in the steady state trickle flow regime. Uneven liquid distribution and the formation of hot spots are the most serious problems experienced during trickle flow operation. In this paper, we advocate the use of non-steady state operation of trickle-bed

  1. Operating reactors licensing actions summary. Volume 5, No. 9

    International Nuclear Information System (INIS)

    1985-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  2. Operating reactors licensing actions summary. Volume 5, No. 8

    International Nuclear Information System (INIS)

    1985-10-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  3. Operating reactors licensing actions summary. Volume 4, No. 9

    International Nuclear Information System (INIS)

    1984-11-01

    This document is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the division of licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  4. Operating reactors licensing actions summary. Vol. 4, No. 2

    International Nuclear Information System (INIS)

    1984-04-01

    This summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  5. Pressure-accelerated azide-alkyne cycloaddition: micro capillary versus autoclave reactor performance.

    Science.gov (United States)

    Borukhova, Svetlana; Seeger, Andreas D; Noël, Timothy; Wang, Qi; Busch, Markus; Hessel, Volker

    2015-02-01

    Pressure effects on regioselectivity and yield of cycloaddition reactions have been shown to exist. Nevertheless, high pressure synthetic applications with subsequent benefits in the production of natural products are limited by the general availability of the equipment. In addition, the virtues and limitations of microflow equipment under standard conditions are well established. Herein, we apply novel-process-window (NPWs) principles, such as intensification of intrinsic kinetics of a reaction using high temperature, pressure, and concentration, on azide-alkyne cycloaddition towards synthesis of Rufinamide precursor. We applied three main activation methods (i.e., uncatalyzed batch, uncatalyzed flow, and catalyzed flow) on uncatalyzed and catalyzed azide-alkyne cycloaddition. We compare the performance of two reactors, a specialized autoclave batch reactor for high-pressure operation up to 1800 bar and a capillary flow reactor (up to 400 bar). A differentiated and comprehensive picture is given for the two reactors and the three methods of activation. Reaction speedup and consequent increases in space-time yields is achieved, while the process window for favorable operation to selectively produce Rufinamide precursor in good yields is widened. The best conditions thus determined are applied to several azide-alkyne cycloadditions to widen the scope of the presented methodology. © 2015 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  6. A review of boiling water reactor water chemistry: Science, technology, and performance

    International Nuclear Information System (INIS)

    Fox, M.J.

    1989-02-01

    Boiling water reactor (BWR) water chemistry (science, technology, and performance) has been reviewed with an emphasis on the relationships between BWR water quality and corrosion fuel performance, and radiation buildup. A comparison of Nuclear Regulatory Commission (NRC) Regulatory Guide 1.56, the Boiling Water Reactor Owners Group (BWROG) Water Chemistry Guidelines, and Plant Technical Specifications showed that the BWROG Guidelines are more stringent than the NRC Regulatory Guide, which is almost identical to Plant Technical Specifications. Plant performance with respect to BWR water chemistry has shown dramatic improvements in recent years. Up until 1979 BWRs experienced an average of 3.0 water chemistry incidents per reactor-year. Since 1979 the water chemistry technical specifications have been violated an average of only 0.2 times per reactor-year, with the most recent data from 1986-1987 showing only 0.05 violations per reactor-year. The data clearly demonstrate the industry-wide commitment to improving water quality in BWRs. In addition to improving water quality, domestic BWRs are beginning to switch to hydrogen water chemistry (HWC), a remedy for intergranular stress corrosion cracking. Three domestic BWRs are presently operating on HWC, and fourteen more have either performed HWC mini tests or are in various stages of HWC implementation. This report includes a detailed review of HWC science and technology as well as areas in which further research on BWR chemistry may be needed. 43 refs., 30 figs., 8 tabs

  7. Analysis and Evaluation of Operational Data 1991 annual report: Power reactors

    International Nuclear Information System (INIS)

    1992-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) describes activities performed during 1991. The report is published in two separate parts. This document, NUREG-1272, Vol. 6, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol. 6, No. 2, covers nonreactors and presents a review of the events and concerns during 1991 associated with the use of licensed material in nonreactor applications. Each volume contains a list of the AEOD reports issued for 1984 through 1991

  8. Safe Operation of Critical Assemblies and Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-05-15

    This Manual is provided as a guide to the safe operation of critical assemblies and small research reactors. It is intended that it should be used by all authorities and persons concerned with, or responsible for, the use of such equipment, in addition to the scientists and technologists who are actually working with, or operating it. It is suggested that it will be of use to those wishing to design and manufacture, or purchase, critical assemblies or research reactors, as well as those already in possession of them, and that it will prove particularly helpful to those users who have no direct access to other collected sources of information. This Manual is not a set of rules or a code of practice, but a series of recommendations which must be interpreted with scientific judgement in their application to any particular problem. The guiding principles are given from which good operational procedures may be established and improved. The promulgation of rigid standards is both impossible and undesirable at the present time, since the topics discussed form part of a rapidly growing science and technology. Therefore, any recommendations made should not be used to restrict or inhibit future developments. The Manual is intended mainly for use in those Member States where there has been little experience in the operation of critical assemblies and research reactors. It has been compounded from the best practices which exist in Member States having a large amount of such experience, so that nothing in it should conflict with the best practices to be encountered in the field of safe operation.

  9. Safe Operation of Critical Assemblies and Research Reactors

    International Nuclear Information System (INIS)

    1961-01-01

    This Manual is provided as a guide to the safe operation of critical assemblies and small research reactors. It is intended that it should be used by all authorities and persons concerned with, or responsible for, the use of such equipment, in addition to the scientists and technologists who are actually working with, or operating it. It is suggested that it will be of use to those wishing to design and manufacture, or purchase, critical assemblies or research reactors, as well as those already in possession of them, and that it will prove particularly helpful to those users who have no direct access to other collected sources of information. This Manual is not a set of rules or a code of practice, but a series of recommendations which must be interpreted with scientific judgement in their application to any particular problem. The guiding principles are given from which good operational procedures may be established and improved. The promulgation of rigid standards is both impossible and undesirable at the present time, since the topics discussed form part of a rapidly growing science and technology. Therefore, any recommendations made should not be used to restrict or inhibit future developments. The Manual is intended mainly for use in those Member States where there has been little experience in the operation of critical assemblies and research reactors. It has been compounded from the best practices which exist in Member States having a large amount of such experience, so that nothing in it should conflict with the best practices to be encountered in the field of safe operation.

  10. Neutronic Core Performance of CAREM-25 Reactor

    International Nuclear Information System (INIS)

    Villarino, Eduardo; Hergenreder, Daniel; Matzkin, S

    2000-01-01

    The actual design state of core of CAREM-25 reactor is presented.It is shown that the core design complains with the safety and operation established requirements.It is analyzed the behavior of the reactor safety and control systems (single failure of the fast shut down system, single failure of the shut down system, single failure of the second shut down system, reactivity worth of the adjust and control system in normal operation and hot shut down, reactivity worth of the adjust and control system and the scheme of movement of the control rod during the operation cycle).It is shown the burnup profile of fuel elements with the proposed scheme of refueling and the burnup and power density distribution at different moments of the operation cycle.The power peaking factor of the equilibrium core is 2.56, the minimum DNBR is 1.90 and its average is 2.09 during the operation cycle

  11. Computer-aided testing and operational aids for PARR-1 nuclear reactor

    International Nuclear Information System (INIS)

    Ansari, S.A.

    1990-01-01

    The utilization of the plant computer of Pakistan Research Reactor (PARR-1) for automatic periodic testing of nuclear instrumentation in the reactor is described. Computer algorithms have been developed for on-line acquisition and real-time processing of nuclear channel signals. The mean value, standard deviation, and probability distributions of nuclear channel signals are obtained in real time, and the computer generates a warning message if the signal error exceeds the maximum permissible error. In this way a faulty channel is automatically identified. Other real-time algorithms are also described that assist the operator in safe reactor operation by automatically computing approach-to-criticality during reactor start-up and the control rod worth determination

  12. Operator performance on the night shift: phases 1 and 2

    International Nuclear Information System (INIS)

    Morisseau, Dolores; Beere, Barnaby; Collier, Steve

    1999-04-01

    The objective of the project on operator performance on the night shift is to determine the effects of circadian rhythms on higher order cognitive processes. The project had two preliminary phases. Subjects were operators from the Halden Boiling Water Reactor, (Phase 1: 7 male operators and shift leaders, aged 26 to 35; Phase 2: 8 male operators and shift leaders, aged 26 to 53). The majority of the operators were the same for both studies. The preliminary work established that Norwegian operators' circadian rhythms fall within universal population norms and, thus, they are suitable subjects for such experiments. During Phase 1, two self-assessment instruments, the Stanford Sleepiness Scale (SSS) and the Global Vigour and Affect Scale (GVA), were administered every hour on all three shifts at the reactor. During Phase 2, three tests from the Walter Reed Performance Assessment Battery were administered at the beginning, middle, and end of each of the three shifts at the reactor. The tests (Serial Add-Subtract, Two-Column Addition, and Logical Reasoning) were administered using a hand-held computer. Both phases were conducted during regular work shifts for one complete shift rota (six weeks). ANOVA with two repeated measures showed that self-reported sleepiness on the night shift, sleepiness with respect to hours into the shift, and the interaction between them all reached statistical significance at p<.001. Data analyses (ANOVA) from Phase 2 indicate that the main effect of SHIFTNO (morning, afternoon, evening) on response times was significant (p<.002); the interaction between SHIFTNO and TINSHIFT (hours into shift) was also significant (p<.009). None of the effects on correctness of response was significant (Phase 2). While correctness of response was not significant for routine cognitive measures, the significant, progressive slowing of response times on the night shift reinforces the concern for possible performance decrements on the night shift. Thus, it

  13. Self operation type reactor scram device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1992-01-01

    A control rod having neutron absorbers therein is held by a curie point electromagnet by way of a control rod extension shaft. The electromagnet is suspended from a vertically movable driving shaft in an upper guide tube. Then, a heater is disposed at the lower portion in the inner side of the upper guide tube. Upon a function confirmation test, the electromagnet is at first pulled up to the inside of the upper guide tube. Subsequently, the electromagnet is heated by the heater by a temperature higher than the curie point of the temperature sensing magnetic material. If the function is normal, armature connected to the control rod extension tube is separated. With such a constitution, the electromagnetic portion is isolated from a coolant main stream, thereby enabling to avoid the cooling effect by the stream of coolants. Accordingly, the operation test for confirming the integrity of the function of the curie point electromagnet can be conducted while placing the electromagnet in the reactor core as it is during actual reactor operation. (I.N.)

  14. Self operation type reactor control device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1990-01-01

    A boiling-requefication chamber containing transporting materials having somewhat higher boiling point that the usual reactor operation temperature and liquid neutron absorbers having a boiling point sufficiently higher than that of the transporting materials is disposed near the coolant exit of a fuel assembly and connected with a tubular chamber in the reactor core with a moving pipe at the bottom. Since the transporting materials in the boiling-requefication chamber is boiled and expanded by heating, the liquid neutron absorbers are introduced passing through the moving pipe into the cylindrical chamber to control the nuclear reactions. When the temperature is lowered by the control, the transporting materials are liquefied to contract the volume and the liquid neutron absorbers in the cylindrical chamber are returned passing through the moving tube into the boiling-liquefication chamber to make the nuclear reaction vigorous. Thus, self-operation type power conditioning and power stopping are enabled not by way of control rods and not requiring external control, to prevent scram failure or misoperation. (N.H.)

  15. The influence of the operating schedule of the Greek Research Reactor on the radiological consequences of the reactor

    International Nuclear Information System (INIS)

    Kollas, J.G.

    1986-04-01

    The sensitivity of the radiological consequences of the Greek Research Reactor to the operating schedule of the reactor is assessed in this report. The consequences are due to the occurrence of a postulated accident, a 20% core melt loss of coolant accident. Three different operating schedules are considered: (a) the present 8 hrs/day, 5 days/wk schedule, (b) a 16 hrs/day, 5 days/wk schedule, and (c) a continuous operation schedule. The results of the analysis indicate that there is a direct relation between consequences and duration of operation. (author)

  16. Periodic Operation of Three-Phase Catalytic Reactors

    Czech Academy of Sciences Publication Activity Database

    Silveston, P.T.; Hanika, Jiří

    2005-01-01

    Roč. 82, č. 6 (2005), s. 1105-1142 ISSN 0008-4034 Institutional research plan: CEZ:AV0Z4072921 Keywords : three-phase reactors * trickle bed * periodic operation Subject RIV: CI - Industrial Chemistry, Chemical Engineering Impact factor: 0.574, year: 2005

  17. The SM and MIR reactors operation experience

    International Nuclear Information System (INIS)

    Kuprienko, V.A.; Klinov, A.V.; Svyatkin, M.N.; Shamardin, V.K.

    1995-01-01

    The SM and MIR operation experience show that continuous work on the problem of ageing, in all its aspects, allows for prolongation of the research plant life cycle by several folds as compared to the initial project. The redesigned SM-3 reactor will operate for another 20 years. The similar result is expected from the MIR planned reconstruction which scope will be the topic of future presentations. (orig.)

  18. Method of operating a water-cooled nuclear reactor

    International Nuclear Information System (INIS)

    Lysell, G.

    1975-01-01

    When operating a water-cooled nuclear reactor, in which the fuel rods consist of zirconium alloy tubes containing an oxidic nuclear fuel, stress corrosion in the tubes can be reduced or avoided if the power of the reactor is temporarily increased so much that the thermal expansion of the nuclear fuel produces a flow of the material in the tube. After that temporary power increase the power output is reduced to the normal power

  19. Operational experience at the AFRRI-TRIGA reactor facility (1972-1974)

    Energy Technology Data Exchange (ETDEWEB)

    McKenzie, J L [Armed Forces Radiobiology Research Institute, Bethesda, MD (United States)

    1974-07-01

    The Armed Forces Radiobiology Research Institute operates a TRIGA Mark-F Reactor which has a movable core, and the capability to operate in the steady state mode up to a maximum power level of one megawatt and in the pulse mode up to a maximum peak power of 2600 MW (10 millisecond pulse). The reactor experienced three operational incidents during the period from February 1972 to February 1974, and two of these incidents were reportable to the Atomic Energy Commission. The first incident consisted of a failure of a weld at the top of the tri-flute on an instrumented fuel element which allowed the tri-flute to move up about one-half inch from its normal position. The instrumented fuel element was removed from the reactor core and replaced with a new instrumented fuel element. The second incident consisted of a malfunction of the reactor core position safety interlock which resulted in the lead shield doors closing around the reactor core shroud. The lead shield doors did not make contact with the reactor core shroud and therefore no damage occurred. The incident was reported to the Atomic Energy Commission. The third incident consisted of a failure of the threaded connector on the top of the transient control rod which allowed the transient control rod to separate from the connecting rod and drop to the bottom of the guide tube. The damaged transient control rod was removed from the guide tube and a new transient rod was installed in the reactor core. This incident was reported to the Atomic Energy Commission. A modification was made to Exposure Room 2 which consisted of placing panels, painted with gadolinium oxide paint, on the walls, ceiling, and reactor core tank projection. This resulted in the {sup 41}Ar production rate and the effluent release to the environment being reduced by a factor of 10 to 20, depending upon the position of the reactor core. (author)

  20. Operational experience at the AFRRI-TRIGA reactor facility (1972-1974)

    International Nuclear Information System (INIS)

    McKenzie, J.L.

    1974-01-01

    The Armed Forces Radiobiology Research Institute operates a TRIGA Mark-F Reactor which has a movable core, and the capability to operate in the steady state mode up to a maximum power level of one megawatt and in the pulse mode up to a maximum peak power of 2600 MW (10 millisecond pulse). The reactor experienced three operational incidents during the period from February 1972 to February 1974, and two of these incidents were reportable to the Atomic Energy Commission. The first incident consisted of a failure of a weld at the top of the tri-flute on an instrumented fuel element which allowed the tri-flute to move up about one-half inch from its normal position. The instrumented fuel element was removed from the reactor core and replaced with a new instrumented fuel element. The second incident consisted of a malfunction of the reactor core position safety interlock which resulted in the lead shield doors closing around the reactor core shroud. The lead shield doors did not make contact with the reactor core shroud and therefore no damage occurred. The incident was reported to the Atomic Energy Commission. The third incident consisted of a failure of the threaded connector on the top of the transient control rod which allowed the transient control rod to separate from the connecting rod and drop to the bottom of the guide tube. The damaged transient control rod was removed from the guide tube and a new transient rod was installed in the reactor core. This incident was reported to the Atomic Energy Commission. A modification was made to Exposure Room 2 which consisted of placing panels, painted with gadolinium oxide paint, on the walls, ceiling, and reactor core tank projection. This resulted in the 41 Ar production rate and the effluent release to the environment being reduced by a factor of 10 to 20, depending upon the position of the reactor core. (author)

  1. The analysis of thermal-hydraulic performances of nuclear ship reactor

    International Nuclear Information System (INIS)

    Wakabayashi, Shinshichi; Hamada, Masao

    1975-01-01

    Thermal-hydraulic performances in the core of nuclear ship reactor was analysed by thermal-hydraulic analyser codes, AMRTC and COBRA-11+DNBCAL. This reactor is of a pressurized water type and incorporates the steam generator within the reactor vessel with the rated power of 330 MWt, which is developed by Nuclear Ship Research Panel Seven (NSR-7) in The Shipbuilding Research Association of Japan. Fuel temperature distributions, coolant temperature distributions, void fractions in coolant and minimum burn out ratio etc. were calculated. Results are as follows; a) The maximum temperature of fuel center is 1,472 0 C that corresponds to 53% as small as the melting point (2,800 0 C). b) Subcooled boiling exists in the core and the maximum void fraction is less than 4%. c) The minimum burn out ratio is not less than the minimum allowable limit of 1.25. It was found from the results of analysis that this reactor was able to be operated wide margin with respect to thermal-hydraulic design limits at the rated power. (auth.)

  2. Licensed operating reactors status summary report data as of January 31, 1989

    International Nuclear Information System (INIS)

    Schwartz, I.

    1989-03-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information, such as spent fuel storage capability, reactor years of experience, and non-power reactors in the United States

  3. Licensed operating reactors: status summary report, data as of May 31, 1982

    International Nuclear Information System (INIS)

    1982-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  4. Licensed operating reactors: Status summary report, data as of 02-28-89

    International Nuclear Information System (INIS)

    1989-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactor Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  5. Licensed operating reactors status summary report, data as of December 31, 1988

    International Nuclear Information System (INIS)

    1989-02-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  6. Licensed operating reactors. Status summary report data as of October 31, 1982

    International Nuclear Information System (INIS)

    1982-11-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  7. Licensed operating reactors. Status summary report, data as of 8-31-82

    International Nuclear Information System (INIS)

    1982-09-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  8. Licensed operating reactors: Status summary report data as of 9-30-86

    International Nuclear Information System (INIS)

    1987-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices. IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  9. Licensed operating reactors: Status summary report, data as of 11-30-88

    International Nuclear Information System (INIS)

    1989-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information, such as spent fuel storage capability, reactor years of experience, and non-power reactors in the United States

  10. Licensed operating reactors: Status summary report, data as of 11-30-86

    International Nuclear Information System (INIS)

    1987-06-01

    The operating units status report - licensed operating reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Administration and Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US. It is hoped the report is helpful to all agencies and individuals interested in maintaining an awareness of the US energy situation as a whole

  11. Licensed operating reactors: Status summary report, Data as of 08-31-86

    International Nuclear Information System (INIS)

    1987-03-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  12. Reactor operator: Training for the job while earning college credit

    International Nuclear Information System (INIS)

    Murdick, S.A.

    1988-01-01

    The nuclear industry is looking for ways to maximize the dollars spent to train licensed reactor operators and other personnel and, at the same time, upgrade their educational level. The prospects of college credit and/or degree requirements imposed by the US Nuclear Regulatory Commission have provided a significant driving force behind this search. The task is complicated, however, because shift schedules do not permit reactor operators to pursue higher education through the traditional classroom route, and the need for plant-specific training and requalification programs dictate against uniformly adapting college-based courses for training use. The National Program on Noncollegiate Sponsored Instruction (National PONSI) has been of considerable help to the nuclear industry in meeting these challenges. Through its college credit recommendation service, National PONSI has assessed the comparability of certain industry training activities to college-level instruction and has been instrumental in gaining academic recognition of these activities. The program has become a vital means for the industry to achieve its dual mission of preparing employees to successfully perform their jobs and providing them with ways to obtain college degrees in the shortest possible time

  13. Reactor operator: Training for the job while earning college credit

    Energy Technology Data Exchange (ETDEWEB)

    Murdick, S.A.

    1988-01-01

    The nuclear industry is looking for ways to maximize the dollars spent to train licensed reactor operators and other personnel and, at the same time, upgrade their educational level. The prospects of college credit and/or degree requirements imposed by the US Nuclear Regulatory Commission have provided a significant driving force behind this search. The task is complicated, however, because shift schedules do not permit reactor operators to pursue higher education through the traditional classroom route, and the need for plant-specific training and requalification programs dictate against uniformly adapting college-based courses for training use. The National Program on Noncollegiate Sponsored Instruction (National PONSI) has been of considerable help to the nuclear industry in meeting these challenges. Through its college credit recommendation service, National PONSI has assessed the comparability of certain industry training activities to college-level instruction and has been instrumental in gaining academic recognition of these activities. The program has become a vital means for the industry to achieve its dual mission of preparing employees to successfully perform their jobs and providing them with ways to obtain college degrees in the shortest possible time.

  14. Regulation concerning installation and operation of reactors for power generation

    International Nuclear Information System (INIS)

    1987-01-01

    This report shows the Ordinance of the Ministry of International Trade and Industry No.77 of December 28, 1978. The ordinance consists of provisions covering application for permission for construction of nuclear reactor (concerning continuous maximum thermal output, location, structure, reactor core, fuel material, moderator, reflector, cooling system, measurement control system, safety circuit, control system, emergency system, radioactive waste proposal facilities, construction plan, meteorology and other environmental conditions, etc.), operation plan (to be submitted every year), application for approval of joint management (name, address, facilities location, conditions for joint management, etc.), cancellation of permission (in five years from the date of permission), record keeping (density and temperature of neutron, temperature and pressure of coolant, purity of mederator, etc.), restriction on access to areas under management (measures to be taken in such areas), measures concerning exposure to radioactive rays (allowable dosage, etc.), patrol and checking in nuclear reactor facilities, self-imposed regular inspection of nuclear reactor facilities, operation of nuclear reactor, transport within plant or business establishment, storage (storing facilities, etc.), waste disposal, etc. (Nogami, K.)

  15. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  16. Reactor physics computer code development for neutronic design, fuel-management, reactor operation and safety analysis of PHWRs

    International Nuclear Information System (INIS)

    Rastogi, B.P.

    1989-01-01

    This report discusses various reactor physics codes developed for neutronic design, fuel-management, reactor operation and safety analysis of PHWRs. These code packages have been utilized for nuclear design of 500 MWe and new 235 MWe PHWRs. (author)

  17. Calculations for accidents in water reactors during operation at power

    International Nuclear Information System (INIS)

    Blanc, H.; Dutraive, P.; Fabrega, S.; Millot, J.P.

    1976-07-01

    The behaviour of a water reactor on an accident occurring as the reactor is normally operated at power may be calculated through the computer code detailed in this article. Reactivity accidents, loss of coolant ones and power over-running ones are reviewed. (author)

  18. Economic evaluation of nuclear reactor operation utilizing power effect

    International Nuclear Information System (INIS)

    Budinsky, M.; Mydliar, J.

    1988-01-01

    The operation of a reactor at the so-called power effect may substantially increase the burnup of fuel to be removed. The aim of the evaluation of such reactor operation is the optimal determination of the time over which the yield of the higher use of fuel exceeds economic losses resulting from the increased share of constant expenditure of the price of generated kWh of electric power which ensues from such operation. A mathematical model is presented for such evaluation of reactor operation with regard to benefits for the national economy which is the basis of the ESTER 2 computer program. The calculations show that the prices of generated and delivered kWh are minimally 2% less than the prices of generated power without the power effect use. The minimum ranges in the interval of 30 to 50 days. The dependence of the price of generated and delivered kWh from the point of view of the operator of the power plant as well as the component of fuel price of generated kWh will not reach the minimum even after 50 days of operation. From the operating and physical points of view the duration of power effect is not expected to exceed 20 to 30 days which means that from the point of view of the national economy the price of generated and delivered kWh will be 1.6 to 2% less and the fuel component of the price of the generated kWh will be 3 to 4.5% lower. (Z.M.). 5 figs., 3 refs

  19. Knowledge and abilities catalog for nuclear power plant operators: boiling water reactors

    International Nuclear Information System (INIS)

    1986-09-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWR) (NUREG-1123) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog and Examiners' Handbook for Developing Operator Licensing Examinations (NUREG-1121) will cover those topics listed under Title 10, Code of Federal Regulations, Part 55. The BWR Catalog contains approximately 7000 knowledge and ability (K/A) statements for ROs and SROs at boiling water reactors. Each K/A statement has been rated for its importance to the safe operation of the plant in a manner ensuring personnel and public health and safety. The BWR K/A Catalog is organized into five major sections: Plant-wide Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Function, Emergency and Abnormal Plant Evolutions, Components, and Theory. The BWR Catalog represents a modification of the form and content of the K/A Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors (NUREG-1122). First, categories of knowledge and ability statements have been redefined. Second, the scope of the definition of emergency and abnormal plant evolutions has been revised in line with a symptom-based approach. Third, K/As related to the operational applications of theory have been incorporated into the delineations for both plant systems and emergency and abnormal plant evolutions, while K/As pertaining to theory fundamental to plant operation have been delineated in a separate theory section. Finally, the components section has been revised

  20. Simulated first operating campaign for the Integral Fast Reactor fuel cycle demonstration

    International Nuclear Information System (INIS)

    Goff, K.M.; Mariani, R.D.; Benedict, R.W.; Park, K.H.; Ackerman, J.P.

    1993-01-01

    This report discusses the Integral Fast Reactor (IFR) which is an innovative liquid-metal-cooled reactor concept that is being developed by Argonne National Laboratory. It takes advantage of the properties of metallic fuel and liquid-metal cooling to offer significant improvements in reactor safety, operation, fuel cycle-economics, environmental protection, and safeguards. Over the next few years, the IFR fuel cycle will be demonstrated at Argonne-West in Idaho. Spent fuel from the Experimental Breeder Reactor II (EBR-II) win be processed in its associated Fuel Cycle Facility (FCF) using a pyrochemical method that employs molten salts and liquid metals in an electrorefining operation. As part of the preparation for the fuel cycle demonstration, a computer code, PYRO, was developed at Argonne to model the electrorefining operation using thermodynamic and empirical data. This code has been used extensively to evaluate various operating strategies for the fuel cycle demonstration. The modeled results from the first operating campaign are presented. This campaign is capable of processing more than enough material to refuel completely the EBR-II core

  1. Fast reactor operation in the United States

    International Nuclear Information System (INIS)

    Smith, R.R.; Cissel, D.W.

    1978-01-01

    Of the many American facilities dedicated to fast reactor technology, six qualify as liquid-metal-cooled fast reactors. All of these satisfy the following criteria: an unmoderated neutron spectrum, highly enriched fuel material, substantial heat production, and the use of a liquid metal coolant. These include the following: EBR-I Clementine, LAMPRE, EBR-II, EFFBR, and SEFOR. Collectively, these facilities encompassed all of the more important features of liquid-metal-cooled fast reactor technology. Coolant types ranged from mercury in Clementine, to NaK in EBR-I, and sodium in the others. Fuels included enriched-uranium metallic alloys in EBR-I, EBR-II, and EFFBR; metallic plutonium in Clementine; molten plutonium alloy in LAMPRE; and a mixed UO 2 -PuO 2 ceramic in SEFOR. Heat removal techniques ranged from air-blast cooling in LAMPRE and SEFOR; steam-electrical generation in EBR-I, EBR-II, and EFFBR; to a mercury-to-water heat dump in Clementine. Operational experience with such diverse systems has contributed heavily to the U.S. Each of the six systems is described from the viewpoints of purpose, history, design, and operation. Attempts are made to limit descriptive material to the most important features and to refer the reader to a few select references if additional information is needed

  2. Operation and control of high density tokamak reactors

    International Nuclear Information System (INIS)

    Attenberger, S.E.; McAlees, D.G.

    1976-01-01

    The incentive for high density operation of a tokamak reactor is discussed. The plasma size required to attain ignition is determined. Ignition is found to be possible in a relatively small system provided other design criteria are met. These criteria are described and the technology developments and operating procedures required by them are outlined. The parameters for such a system and its dynamic behavior during the operating cycle are also discussed

  3. Results of Operation and Utilization of the Dalat Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Nguyen Nhi Dien; Luong Ba Vien; Le Vinh Vinh; Duong Van Dong; Nguyen Xuan Hai; Pham Ngoc Son; Cao Dong Vu

    2014-01-01

    The Dalat Nuclear Research Reactor (DNRR) with the nominal power of 500 kW was reconstructed and upgraded from the USA 250-kW TRIGA Mark-II reactor built in early 1960s. The renovated reactor was put into operation on 20 March 1984. It was designed for the purposes of radioisotope production (RI), neutron activation analysis (NAA), basic and applied researches, and nuclear education and training. During the last 30 years of operation, the DNRR was efficiently utilized for producing many kinds of radioisotopes and radiopharmaceuticals used in nuclear medicine centers and other users in industry, agriculture, hydrology and scientific research; developing a combination of nuclear analysis techniques (INAA, RNAA, PGNAA) and physic-chemical methods for quantitative analysis of about 70 elements and constituents in various samples; carrying out experiments on the reactor horizontal beam tubes for nuclear data measurement, neutron radiography and nuclear structure study; and establishing nuclear training and education programs for human resource development. This paper presents the results of operation and utilization of the DNRR. In addition, some main reactor renovation projects carried out during the last 10 years are also mentioned in the paper. (author)

  4. Control of water chemistry in operating reactors

    International Nuclear Information System (INIS)

    Riess, R.

    1997-01-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ''modified'' B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs

  5. Control of water chemistry in operating reactors

    Energy Technology Data Exchange (ETDEWEB)

    Riess, R [Siemens AG Unternehmensbereich KWU, Erlangen (Germany)

    1997-02-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ``modified`` B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs.

  6. Some particular problems put by operating experimental reactors

    International Nuclear Information System (INIS)

    Candiotti, C.; Mabeix, R.; Uguen, R.

    1960-01-01

    On basis of a six years experience in operating research reactors, the authors explain, first, the difference in their utilization between these piles and another similar ones and, after, in consequence, they set off corresponding servitudes. These servitudes put very particular problems in operating itself, maintenance, modifications or additions on these apparatus. (author) [fr

  7. Fuel performance in NPD while operating with two-phase coolant

    International Nuclear Information System (INIS)

    Bain, A.S.

    1978-03-01

    The NPD reactor operated as a boiling heavy water reactor from October 27, 1968 to April 18, 1971. At 25 MWe the steam quality at the steam generator inlet was 13 wt%, and fuel channel outlet steam qualities ranged from 2 to 22 wt%. During this period ammonia was used for oxygen suppression and pH control. At equilibrium the coolant had 7 mg NH 3 /kg D 2 O, 60 ml D 2 /kg D 2 O and 20 ml N 2 /kg D 2 O. The performance of the fuel was excellent during the time that NPD operated in the boiling mode. No indications were observed of dimensional changes, inter-element fretting, fuel/sheath interaction, excessive oxidation, excessive deuterium concentrations, or unusual migration of hydrogen and deuterium to the cooler end plugs. One element defected; although the defect mechanism could not be identified at the time, we now believe the defect was associated with faulty bar stock for end plugs. The behaviour of the defective element was similar to that for other defective elements in CANDU reactors. No problems were encountered in removing the defected bundle from the reactor. (author)

  8. Performance evaluation of reactor operated zircaloy-2 pressure tubes of RAPS-1

    International Nuclear Information System (INIS)

    Chatterjee, S.; Ramadasan, E.; Balakrishnan, K.S.; Bahl, J.K.

    1992-01-01

    Detailed post irradiation examination was carried out on pressure tube sections from E-10, F-9 and F-10 locations of RAPS-1 after an in-reactor residence equivalent to 3.6 effective full power years. The F-10 pressure tube was studied in detail on sections obtained from one end to the other, whereas in the case of E-9 and F-9 pressure tubes only the end sections were examined. The studies carried out were visual examination, metallography, hydrogen i.e. H(D) analysis and mechanical testing at 300 C. Microstructural observations revealed uniform and random hydride/deuteride platelet distribution and absence of blisters or hydride segregation. The H(D) content in the F-10 pressure tube was found to vary in the range 6-12 ppm. The typical H(D) content in the three tubes was around 1 ppm. The H(D) pick-up evaluated from the observed oxide layer thickness was 8 ppm. Longitudinal tensile specimens fabricated from the F-10 pressure tube section and tested at 300 C exhibited increase in yield strength and tensile strength of 39% and 30% respectively. The residual uniform elongation was typically 1.8%. The observed changes in the tensile properties were found to be lower than those reported on unstressed specimens irradiated to similar neutron fluences. The observed hydrogen content and tensile properties obtained in F-10 pressure tube would not be detrimental under normal reactor operating conditions. (author). 10 refs., 4 figs., 2 tabs., 1 annexure

  9. Operational method for demonstrating fuel loading integrity in a reactor having accessible 235U fuel

    International Nuclear Information System (INIS)

    Ward, D.R.

    1979-07-01

    The Health Physics Research Reactor is a small pulse reactor at the Oak Ridge National Laboratory. It is desirable for the operator to be able to demonstrate on a routine basis that all the fuel pieces are present in the reactor core. Accordingly, a technique has been devised wherein the control rod readings are recorded with the reactor at delayed critical and corrections are made to compensate for the effects of variations in reactor height above the floor, reactor power, core temperature, and the presence of any massive neutron reflectors. The operator then compares these readings with the values expected based on previous operating experience. If this routine operational check suggests that the core fuel loading might be deficient, a more rigorous follow-up may be made

  10. Operability design review of prototype large breeder reactor (PLBR) designs. Final report, September 1981

    International Nuclear Information System (INIS)

    Beakes, J.H.; Ehman, J.R.; Jones, H.M.; Kinne, B.V.T.; Price, C.M.; Shores, S.P.; Welch, J.K.

    1981-09-01

    Prototype Large Breeder Reactor (PLBR) designs were reviewed by personnel with extensive power plant operations experience. Fourteen normal and off-normal events, such as startup, shutdown, refueling, reactor scram and loss of feedwater, were evaluated using an operational evaluation methodology which is designed to facilitate talk-through sessions on operational events. Human factors engineers participated in the review and assisted in developing and refining the review methodologies. Operating experience at breeder reactor facilities such as Experimental Breeder Reactor-II (EBR-II), Enrico Fermi Atomic Power Plant - Unit 1, and the Fast Flux Test Facility (FFTF) was gathered, analyzed, and used to determine whether lessons learned from operational experience had been incorporated into the PLBR designs. This eighteen month effort resulted in approximately one hundred specific recommendations for improving the operability of PLBR designs

  11. Annual report on operation, utilization and technical development of research reactors and hot laboratory, from April 1, 1987 to March 31, 1988

    International Nuclear Information System (INIS)

    1988-10-01

    Activities of the Department of Research Reactor Operation in fiscal year 1987 are described. The department is responsible for operation and maintenance of JRR-2, JRR-4, Research Reactor Development Division which performed upgraded JRR-3 and other R D, and Hot Laboratory. In the above connection various other work has also been performed, such as technical management of fuel and coolant, radiation control, irradiation technique, etc. In Hot Laboratory, we have performed post-irradiation examinations of fuels and materials, and also development of examination procedures, too. (author)

  12. Annual report on operation, utilization and technical development of research reactors and hot laboratory, from April 1, 1985 to March 31, 1986

    International Nuclear Information System (INIS)

    1986-10-01

    Activities of the Department of Research Reactor Operation in fiscal year 1985 are described. The department is responsible for operation and maintenance of JRR-2, JRR-4, Research Reactor Development Division which performed upgraded JRR-3 and other R and D, and Hot Laboratory. In the above connection various other work has also been performed, such as technical management of fuel and coolant, radiation control, irradiation technique, etc. In Hot Laboratory, we have performed post-irradiation examinations of fuels and materials, and also development of examination procedures, too. (author)

  13. Operation experience with the 3 MW TRIGA Mark-II research reactor of Bangladesh

    International Nuclear Information System (INIS)

    Islam, M.S.; Haque, M.M.; Salam, M.A.; Rahman, M.M.; Khandokar, M.R.I.; Sardar, M.A.; Saha, P.K.; Haque, A.; Malek Sonar, M.A.; Uddin, M.M.; Hossain, S.M.S.; Zulquarnain, M.A.

    2004-01-01

    The 3 MW TRIGA Mark-II research reactor of Bangladesh Atomic Energy Commission (BAEC) has been operating since September 14, 1986. The reactor is used for radioisotope production ( 131 I, 99m Tc, 46 Sc), various R and D activities and manpower training. The reactor has been operated successfully since it's commissioning with the exception of a few reportable incidents. Of these, the decay tank leakage incident of 1997 is considered to be the most significant one. As a result of this incident, reactor operation at full power under forced-convection mode remained suspended for about 4 years. During that time, the reactor was operated at a power level of 250 kW so as to carry out experiments that require lower neutron flux. This was made possible by establishing a temporary by pass connection across the decay tank using local technology. The other incident was the contamination of the Dry Central Thimble (DCT) that took place in March 2002 when a pyrex vial containing 50 g of TeO 2 powder got melted inside the DCT. The vial was melted due to high heat generation on its surface while the reactor was operated for 8 hours at 3 MW for trial production of Iodine-131 ( 131 I). A Wet Central Thimble (WCT) was used to replace the damaged DCT in June 2002 such that the reactor operation could be resumed. The WCT was again replaced by a new DCT in June 2003 such that radioisotope production could be continued. A total of 873 irradiation requests (IRs) have been catered for different reactor uses. Out of these, 114 IRs were for radioisotope (RI) production and 759 IRs for different experiments. The total amount of RI produced stands at about 2100 GBq. The total amount of burn-up-fuel is about 6158 MWh. Efforts are on to undertake an ADP project so as to convert the analog console and I and C system of the reactor into digital one. The paper summarizes the reactor operation experiences focusing on troubleshooting, rectification, modification, RI production, various R and D

  14. Nuclear Systems Enhanced Performance Program, Maintenance Cycle Extension in Advanced Light Water Reactor Design

    Energy Technology Data Exchange (ETDEWEB)

    Professor Neill Todreas

    2001-10-01

    A renewed interest in new nuclear power generation in the US has spurred interest in developing advanced reactors with features which will address the public's concerns regarding nuclear generation. However, it is economic performance which will dictate whether any new orders for these plants will materialize. Economic performance is, to a great extent, improved by maximizing the time that the plant is on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Indeed, the strategy for the advanced light water reactor plant IRIS (International Reactor, Innovative and Secure) is to utilize an eight year operating cycle. This report describes a formalized strategy to address, during the design phase, the maintenance-related barriers to an extended operating cycle. The top-level objective of this investigation was to develop a methodology for injecting component and system maintainability issues into the reactor plant design process to overcome these barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the IRIS design. The first step in meeting the top-level objective was to determine the types of operating cycle length barriers that the IRIS design team is likely to face. Evaluation of previously identified regulatory and investment protection surveillance program barriers preventing a candidate operating PWR from achieving an extended (48 month) cycle was conducted in the context of the IRIS design. From this analysis, 54 known IRIS operating cycle length barriers were identified. The resolution methodology was applied to each of these barriers to generate design solution alternatives for consideration in the IRIS design. The methodology developed has been demonstrated to narrow the design space to feasible design solutions which enable a desired operating cycle length, yet is general enough to have broad applicability. Feedback from the IRIS design team

  15. Global results concerning the operation of the reactors at the Grenoble nuclear research centre

    International Nuclear Information System (INIS)

    Jacquemain, M.; Marouby, R.

    1964-01-01

    The Grenoble Nuclear Research Centre has 3 reactors of the open-core swimming-pool type: Melusine (2 MW) operating since 1959, Siloe (15 MW) operating since 1963, Siloette (100 kW) operating since 1964 The report describes the operating conditions of these reactors and the improvements which have been made to increase the flux in the irradiation rigs and to increase the safety and the regularity of operation. The advantages are also explained of having on the same site, close to one another, several reactors with wide ranges of flux. (authors) [fr

  16. IEA-R1 research reactor: operational life extension and considerations regarding future decommissioning

    International Nuclear Information System (INIS)

    Frajndlich, Roberto

    2009-01-01

    The IEA-R1 reactor is a pool type research reactor moderated and cooled by light water and uses graphite and beryllium reflectors. The reactor is located at the Instituto de Pesquisas Energeticas e Nucleares (IPEN-CNEN/SP), in the city of Sao Paulo, Brazil. It is the oldest research reactor in the southern hemisphere and one of the oldest of this kind in the world. The first criticality of the reactor was obtained on September 16, 1957. Given the fact that Brazil does not have yet a definitive radioactive waste repository and a national policy establishing rules for the spent fuel storage, the institutions which operate the research reactors for more than 50 years in the country have searched internal solutions for continued operation. This paper describes the spent fuel assemblies and radioactive waste management process for the IEA-R1 reactor and the refurbishment and modernization program adopted to extend its lifetime. Some considerations about the future decommissioning of the reactor are also discussed which, in my opinion, might help the operating organization to make decisions about financial, legal and technical aspects of the decommissioning procedures in a time frame of 10-15 years(author)

  17. Criteria for safety-related nuclear-power-plant operator actions: 1982 pressurized-water-reactor (PWR) simulator exercises

    International Nuclear Information System (INIS)

    Crowe, D.S.; Beare, A.N.; Kozinsky, E.J.; Haas, P.M.

    1983-06-01

    The primary objective of the Safety-Related Operator Action (SROA) Program at Oak Ridge National Laboratory is to provide a data base to support development of criteria for safety-related actions by nuclear power plant operators. When compared to field data collected on similar events, a base of operator performance data developed from the simulator experiments can then be used to establish safety-related operator action design evaluation criteria, evaluate the effects of performance shaping factors, and support safety/risk assessment analyses. This report presents data obtained from refresher training exercises conducted in a pressurized water reactor (PWR) power plant control room simulator. The 14 exercises were performed by 24 teams of licensed operators from one utility, and operator performance was recorded by an automatic Performance Measurement System. Data tapes were analyzed to extract operator response times (RTs) and error rate information. Demographic and subjective data were collected by means of brief questionnaires and analyzed in an attempt to evaluate the effects of selected performance shaping factors on operator performance

  18. Demonstrated operational and inherent safety of the prototype fast reactor (PFR)

    International Nuclear Information System (INIS)

    Smedley, J.A.; Gregory, C.V.; Judd, A.M.

    1983-01-01

    The Prototype Fast Reactor (PFR) is sited at Dounreay, on the north coast of Scotland in the United Kingdom, and has been in operation since 1974. Three aspects of the safety of the reactor are described, including the all-important practical consideration of operational safety, a demonstration of the limited consequences of a sodium/water reaction in a steam generator and the ability of the reactor to protect itself against highly improbable incidents. Attention is drawn to the low radiation levels in the plant and the correspondingly low dose rate to personnel. A feature of PFR operation has been the stable and predictable behaviour of its core together with the high degree of reliability exhibited by the engineered safety system. No failures have occurred within the standard driver charge but two experimental fuel pins suffered cladding failure, which was detected easily by the fission gas and delayed neutron detection systems. In the steam generating units sodium and water are separated by the single steel wall of the steam tubes. Although no under-sodium leak has occurred, an experimental programme is continuing and demonstrates that were any such leak to occur its consequences would be containable and would not result in the release of sodium to the environment or any breach of the reactor containment. The final section describes the inherent safety features of the reactor which enable it to survive a range of very improbable incidents even when the engineered safeguards fail. The features considered are natural circulation, which has been demonstrated by reactor experiment; the reactor's negative power coefficient, which, for example, enables the reactor to survive a complete loss of heat sink; and the durability of the fuel pins, demonstrated by a series of boiling experiments in the Dounreay Fast Reactor (DFR). (author)

  19. Regulation for installation and operation of reactor

    International Nuclear Information System (INIS)

    1977-01-01

    Concerning the description of an application for the approval of installation of a reactor, stipulated in Article 23 paragraph 2 of the Law for Regulation of Nuclear Source Materials, Nuclear Fuel Materials and Reactors (hereinafter referred to as the Law), the following items must be written. Namely, the heat output of the reactor in Article 23 paragraph 2 item 3 of the Law, the position, structure and facilities of the reactor facilities, described according to the stipulated classifications, the work plan, nuclear fuel materials employed, and the disposal of spent fuel. Concerning an application for the approval of a reactor installed aboard a foreign ship, stipulations are made separately. Description of an application for the approval of change of the heat output of a reactor and others should include the stipulated items. When it is wished to undergo inspection of the construction and performance of reactor facilities, an application for that end including the required items should be filed. Various safety measures preventing personnel from being exposed to radiation should be taken. When a foreign atomic-powered ship tries to enter a Japanese port, the stipulated necessary informations should be reported 60 days before such ship actually enters the Japanese port. A chief technician of reactors should take and pass the official examination. (Rikitake, Y.)

  20. Operating Experience from Events Reported to the IAEA Incident Reporting System for Research Reactors

    International Nuclear Information System (INIS)

    2015-03-01

    Operating experience feedback is an effective mechanism in providing lessons learned from events and the associated corrective actions to prevent them, helping to improve safety at nuclear installations. The Incident Reporting System for Research Reactors (IRSRR), which is operated by the IAEA, is an important tool for international exchange of operating experience feedback for research reactors. The IRSRR reports contain information on events of safety significance with their root causes and lessons learned which help in reducing the occurrence of similar events at research reactors. To improve the effectiveness of the system, it is essential that national organizations demonstrate an appropriate interest for the timely reporting of events important to safety and share the information in the IRSRR database. At their biennial technical meetings, the IRSRR national coordinators recommended collecting the operating experience from the events reported to the IRSRR and disseminating it in an IAEA publication. This publication highlights the root causes, safety significance, lessons learned, corrective actions and the causal factors for the events reported to the IRSRR up to September 2014. The publication also contains relevant summary information on research reactor events from sources other than the IRSRR, operating experience feedback from the International Reporting System for Operating Experience considered relevant to research reactors, and a description of the elements of an operating experience programme as established by the IAEA safety standards. This publication will be of use to research reactor operating organizations, regulators and designers, and any other organizations or individuals involved in the safety of research reactors