  1. Remote assembly and maintenance of fusion reactors

    International Nuclear Information System (INIS)

    Becquet, M.C.; Farfaletti-Casali, F.

    1991-01-01

    This paper intend to present the state of the art in the field of remote assembly and maintenance, including system analysis design and operation for controlled fusion device such as JET, and the next NET and ITER reactors. The operational constraints of fusion reactors with respect to temperature, radiations dose rates and cumulated doses are considered with the resulting design requirements. Concepts like articulated boom, in-vessel vehicle and blanket handling device are presented. The close relations between computer simulations and experimental validation of those concepts are emphasized to ensure reliability of the operational behavior. Mockups and prototypes in reduced and full scale, as operating machines are described to illustrate the progress in remote operations for fusion reactors. The developments achieved at the Institute for System Engineering and Informatics of the Joint Research Center, in the field of remote blanket maintenance, reliability assessment of RH systems and remote cut and welding of lips joints are considered. (author)

  2. Japanese contributions to containment structure, assembly and maintenance and reactor building for ITER

    International Nuclear Information System (INIS)

    Shibanuma, Kiyoshi; Honda, Tsutomu; Kanamori, Naokazu

    1991-06-01

    Joint design work on Conceptual Design Activity of International Thermonuclear Experimental Reactor (ITER) with four parties, Japan, the United States, the Soviet Union and the European Community began in April 1988 and was successfully completed in December 1990. In Japan, the home team was established in wide range of collaboration between JAERI and national institute, universities and heavy industries. The Fusion Experimental Reactor (FER) Team at JAERI is assigned as a core of the Japanese home team to support the joint Team activity and mainly conducted the design and R and D in the area of containment structure, remote handling and plant system. This report mainly describes the Japanese contribution on the ITER containment structure, remote handling and reactor building design. Main areas of contributions are vacuum vessel, attaching locks, electromagnetic analysis, cryostat, port and service line layout for containment structure, in-vessel handling equipment design and analysis, blanket handling equipment design and related short term R and D for assembly and maintenance, and finally reactor building design and analysis based on the equipment and service line layout and components flow during assembly and maintenance. (author)

  3. ITER assembly and maintenance

    International Nuclear Information System (INIS)

    Honda, T.; Davis, F.; Lousteau, D.

    1991-01-01

    This document is intended to describe the work conducted by the ITER Assembly and Maintenance (A and M) Design Unit and the supporting home teams during the ITER Conceptual Design Activities, carried out from 1988 through 1990. Its content consists of two main sections, i.e., Chapter III, which describes the identified tasks to be performed by the A and M system and a general description of the required equipment; and Chapter IV, which provides a more detailed description of the equipment proposed to perform the assigned tasks. A two-stage R and D program is now planned, i.e., (1) a prototype equipment functional tests using full scale mock-ups and (2) a full scale integration demonstration test facility with real components (vacuum vessel with ports, blanket modules, divertor modules, armor tiles, etc.). Crucial in-vessel and ex-vessel operations and the associated remote handling equipment, including handling of divertor plates and blanket modules will be demonstrated in the first phase, whereby the database needed to proceed with the engineering phase will be acquired. The second phase will demonstrate the ability of the overall system to execute the required maintenance procedures and evaluate the performance of the prototype equipment

  4. Nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Sasaki, Y.; Tashima, J.

    1975-01-01

    A description is given of nuclear reactor fuel assemblies arranged in the form of a lattice wherein there is attached to the interface of one of two adjacent fuel assemblies a plate spring having a concave portion curved toward said interface and to the interface of the other fuel assembly a plate spring having a convex portion curved away from said interface

  5. Nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Sakurai, Shungo; Ogiya, Shunsuke.

    1990-01-01

    In a fuel assembly, if the entire fuels comprise mixed oxide fuels, reactivity change in cold temperature-power operation is increased to worsen the reactor shutdown margin. The reactor shutdown margin has been improved by increasing the burnable poison concentration thereby reducing the reactivity of the fuel assembly. However, since unburnt poisons are present at the completion of the reactor operation, the reactivity can not be utilized effectively to bring about economical disadvantage. In view of the above, the reactivity change between lower temperature-power operations is reduced by providing a non-boiling range with more than 9.1% of cross sectional area at the inside of a channel at the central portion of the fuel assembly. As a result, the amount of the unburnt burnable poisons is decreased, the economy of fuel assembly is improved and the reactor shutdown margin can be increase. (N.H.)

  6. Nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Marmonier, Pierre; Mesnage, Bernard; Nervi, J.C.

    1975-01-01

    This invention refers to fuel assemblies for a liquid metal cooled fast neutron reactor. Each assembly is composed of a hollow vertical casing, of regular polygonal section, containing a bundle of clad pins filled with a fissile or fertile substance. The casing is open at its upper end and has a cylindrical foot at its lower end for positioning the assembly in a housing provided in the horizontal diagrid, on which the core assembly rests. A set of flat bars located on the external surface of the casing enables it to be correctly orientated in its housing among the other core assemblies [fr

  7. Nuclear reactor control assembly

    International Nuclear Information System (INIS)

    Negron, S.B.

    1991-01-01

    This patent describes an assembly for providing global power control in a nuclear reactor having the core split into two halves. It comprises a disk assembly formed from at least two disks each machined with an identical surface hole pattern such that rotation of one disk relative to the other causes the hole pattern to open or close, the disk assembly being positioned substantially at the longitudinal center of and coaxial with the core halves; and means for rotating at least one of the disks relative to the other

  8. Nuclear reactor spacer assembly

    International Nuclear Information System (INIS)

    Anthony, A.J.; Groves, M.D.

    1979-01-01

    A fuel assembly for a nuclear reactor is disclosed wherein the fuel element receiving and supporting grid is comprised of a first metal, the guide tubes which pass through the grid assembly are comprised of a second metal and the grid is supported on the guide tubes by means of expanded sleeves located intermediate the grid and guide tubes. The fuel assembly is fabricated by inserting the sleeves, of initial outer diameter commensurate with the guide tube outer diameters, through the holes in the grid assembly provided for the guide tubes and thereafter expanding the sleeves radially outwardly along their entire length such that the guide tubes can subsequently be passed through the sleeves. The step of radial expansion, as a result of windows provided in the sleeves having dimensions commensurate with the geometry of the grid, mechanically captures the grid and simultaneously preloads the sleeve against the grid whereby relative motion between the grid and guide tube will be precluded

  9. Nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Vikhorev, Yu.V.; Biryukov, G.I.; Kirilyuk, N.A.; Lobanov, V.N.

    1977-01-01

    A fuel assembly is proposed for nuclear reactors allowing remote replacement of control rod bundles or their shifting from one assembly to another, i.e., their multipurpose use. This leads to a significant increase in fuel assembly usability. In the fuel assembly the control rod bundle is placed in guide tube channels to which baffles are attached for fuel element spacing. The remote handling of control rods is provided by a hollow cylinder with openings in its lower bottom through which the control rods pass. All control rods in a bundle are mounted to a cross beam which in turn is mounted in the cylinder and is designed for grasping the whole rod bundle by a remotely controlled telescopic mechanism in bundle replacement or shifting. (Z.M.)

  10. Nuclear reactor assembly

    International Nuclear Information System (INIS)

    Dorner, H.; Scholz, M.; Jungmann, A.

    1975-01-01

    A nuclear reactor assembly includes a reactor pressure tank having a substantially cylindrical side wall surrounded by the wall of a cylindrical cavity formed by a biological shield. A rotative cylindrical wall is interposed between the walls and has means for rotating it from outside of the shield, and a probe is carried by the rotative wall for monitoring the pressure tank's wall. The probe is vertically movable relative to the rotative cylindrical wall, so that by the probe's vertical movement and rotation of the rotative cylinder, the reactor's wall can be very extensively monitored. If the reactor pressure tank's wall fails, it is contained by the rotative wall which is backed-up by the shield cavity wall. (Official Gazette)

  11. Nuclear reactor core assembly

    International Nuclear Information System (INIS)

    Baxi, C.B.

    1978-01-01

    The object of the present invention is to provide a fast reactor core assembly design for use with a fluid coolant such as liquid sodium or carbon monoxide incorporating a method of increasing the percentage of coolant flow though the blanket elements relative to the total coolant flow through the blanket and fuel elements during shutdown conditions without using moving parts. It is claimed that deterioration due to reactor radiation or temperature conditions is avoided and ready modification or replacement is possible. (U.K.)

  12. Nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    1975-01-01

    A description is given of a nuclear reactor fuel assembly comprising a cluster of fuel elements supported by transversal grids so that their axes are parallel to and at a distance from each other, in order to establish interstices for the axial flow of a coolant. At least one of the interstices is occupied by an axial duct reserved for an auxiliary cooling fluid and is fitted with side holes through which the auxiliary cooling fluid is sprayed into the cluster. Deflectors extend as from a transversal grid in a position opposite the holes to deflect the cooling fluid jet towards those parts of the fuel elements that are not accessible to the auxiliary coolant. This assembly is intended for reactors cooled by light or heavy water [fr

  13. Reactor and fuel assembly

    International Nuclear Information System (INIS)

    Ishii, Yoshihiko; Bessho, Yasunori; Sano, Hiroki; Yokomizo, Osamu; Yamashita, Jun-ichi.

    1990-01-01

    The present invention realizes an effective spectral operation by applying an optimum pressure loss coefficient while taking the characteristics of a lower tie plate into consideration. That is, the pressure loss coefficient of the lower tie plate is optimized by varying the cross sectional area of a fuel assembly flow channel in the lower tie plate or varying the surface roughness of a coolant flow channel in the lower tie plate. Since there is a pressure loss coefficient to optimize the moderator density over a flow rate change region, the effect of spectral shift rods can be improved by setting the optimum pressure loss coefficient of the lower tie plate. According to the present invention, existent fuel assemblies can easily be changed successively to fuel assemblies having spectral shift rods of a great spectral shift effect by using existent reactor facilities as they are. (I.S.)

  14. Reactor fuel assembly

    International Nuclear Information System (INIS)

    Anthony, A.J.; Groves, M.D.

    1980-01-01

    A nuclear reactor fuel assembly having a lower end fitting and actuating means interacting therewith for holding the assembly down on the core support stand against the upward flow of coolant. Locking means for interacting with projections on the support stand are carried by the lower end fitting and are actuated by the movement of an actuating rod operated from above the top of the assembly. In one embodiment of the invention the downward movement of the actuating rod forces a latched spring to move outward into locking engagement with a shoulder on the support stand projections. In another embodiment, the actuating rod is rotated to effect the locking between the end fitting and the projection. (author)

  15. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Smith, J. L.

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS)

  16. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 113: Reactor Maintenance, Assembly, and Disassembly Building Nevada Test Site, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    J. L. Smith

    2001-01-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the action necessary for the closure in place of Corrective Action Unit (CAU) 113 Area 25 Reactor Maintenance, Assembly, and Disassembly Facility (R-MAD). CAU 113 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (NDEP, 1996). The CAU is located in Area 25 of the Nevada Test Site (NTS) and consists of Corrective Action Site (CAS) 25-04-01, R-MAD Facility (Figures 1-2). This plan provides the methodology for closure in place of CAU 113. The site contains radiologically impacted and hazardous material. Based on preassessment field work, there is sufficient process knowledge to close in place CAU 113 using the SAFER process. At a future date when funding becomes available, the R-MAD Building (25-3110) will be demolished and inaccessible radiologic waste will be properly disposed in the Area 3 Radiological Waste Management Site (RWMS).

  17. Maintenance technologies for reactor internals

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Kenji [Nuclear Energy Systems and Services Div., Toshiba Corp., Tokyo (Japan); Kobayashi, Masahiro [Toshiba Corp., Yokohama (Japan). Keihin Product Operations; Sano, Yuji; Kimura, Seiichiro [Power and Industrial Systems Research and Development Center, Toshiba Corp., Tokyo(Japan)

    2000-10-01

    Toshiba places the highest priority on maintenance technologies for the reactor pressure vessel (RPV) and its internals in operating nuclear power plants. This paper summarizes the status of applied laser maintenance technologies, both preventive and repair. For laser peeing and laser desensitization treatment (LDT) technologies in particular, field applications are also described in detail. In the future, the area of field applications for preventive maintenance, repair, and inspection technologies will be further expanded. (author)

  18. Fuel assembly and reactor core

    International Nuclear Information System (INIS)

    Aoyama, Motoo; Koyama, Jun-ichi; Uchikawa, Sadao; Bessho, Yasunori; Nakajima, Akiyoshi; Maruyama, Hiromi; Ozawa, Michihiro; Nakamura, Mitsuya.

    1990-01-01

    The present invention concerns fuel assemblies charged in a BWR type reactor and the reactor core. The fuel assembly comprises fuel rods containing burnable poisons and fuel rods not containing burnable poisons. Both of the highest and the lowest gadolinia concentrations of the fuel rods containing gadolinia as burnable poisons are present in the lower region of the fuel assembly. This can increase the spectral shift effect without increasing the maximum linear power density. (I.N.)

  19. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  20. Fuel assembly and reactor core

    International Nuclear Information System (INIS)

    Yuchi, Yoko; Aoyama, Motoo; Haikawa, Katsumasa; Yamanaka, Akihiro; Koyama, Jun-ichi.

    1996-01-01

    In a fuel assembly of a BWR type reactor, a region substantially containing burnable poison is divided into an upper region and a lower region having different average concentrations of burnable poison along a transverse cross section perpendicular to the axial direction. The ratio of burnable poison contents of both regions is determined to not more than 80%, and the average concentration of the burnable poison in the lower region is determined to not less than 9% by weight. An infinite multiplication factor at an initial stage of the burning of the fuel assembly is controlled effectively by the burnable poisons. Namely, the ratio of the axial power can be controlled by the distribution of the enrichment degree of uranium fuels and the distribution of the burnable poison concentration in the axial direction. Since the average enrichment degree of the reactor core has to be increased in order to provide an initially loaded reactor core at high burnup degree. Distortion of the power distribution in the axial direction of the reactor core to which fuel assemblies at high enrichment degree are loaded is flattened to improve thermal margin, to extend continuous operation period and increase a burnup degree upon take-out thereby improving fuel economy without worsening the reactor core characteristics of the initially loaded reactor core. (N.H.)

  1. Fuel assembly in a reactor

    International Nuclear Information System (INIS)

    Saito, Shozo; Kawahara, Akira.

    1975-01-01

    Object: To provide a fuel assembly in a reactor which can effectively prevent damage of the clad tube caused by mutual interference between pellets and the clad tube. Structure: A clad tube for a fuel element, which is located in the outer peripheral portion, among the fuel elements constituting fuel assemblies arranged in assembled and lattice fashion within a channel box, is increased in thickness by reducing the inside diameter thereof to be smaller than that of fuel elements internally located, thereby preventing damage of the clad tube resulting from rapid rise in output produced when control rods are removed. (Kamimura, M.)

  2. Reactor fuel assembly fastening

    International Nuclear Information System (INIS)

    Formanek, F.J.; Schukei, G.E.

    1980-01-01

    A nuclear fuel assembly is described, adapted to be locked into first mating surfaces on a core support stand, comprising a lower end fitting having posts for resting on the stand; elongated hook members pivotally connected at one end to the lower end fitting and having a second mating surface at the other end to engage the first mating surfaces; actuating means located between the posts on the lower end fitting and being vertically movable relative to the end fitting; and rigid links pivotally attached at one end to the hook members intermediate the connection of the hook members to the end fitting and the second mating surface and pivotally attached at the other end to the actuating means, the link having a length between the pivoted connections such that the second mating surface on the hook members locks into engagement with the first mating surfaces on the stand as the links approach the horizontal. (author)

  3. Fuel assemblies for nuclear reactor

    International Nuclear Information System (INIS)

    Nishi, Akihito.

    1987-01-01

    Purpose: To control power-up rate at the initial burning stage of new fuel assemblies due to fuel exchange in a pressure tube type power reactor. Constitution: Burnable poisons are disposed to a most portion of fuel pellets in a fuel assembly to such a low concentration as the burn-up rate changes with time at the initial stage of the burning. The most portion means substantially more than one-half part of the pellets and gadolinia is used as burn-up poisons to be dispersed and the concentration is set to less than about 0.2 %. Upon elapse of about 15 days after the charging, the burnable poisons are eliminated and the infinite multiplication factors are about at 1.2 to attain a predetermined power state. Since the power-up rate of the nuclear reactor fuel assembly is about 0.1 % power/hour and the power-up rate of the fuel assembly around the exchanged channel is lower than that, it can be lowered sufficiently than the limit for the power-up rate practiced upon reactor start-up thereby enabling to replace fuels during power operation. (Horiuchi, T.)

  4. Fuel assemblies for nuclear reactors

    International Nuclear Information System (INIS)

    Jabsen, F.S.

    1979-01-01

    In a nuclear fuel assembly, hollow guide posts protrude into a fuel assembly and fitting grill from a biased spring pad with a plunger that moves with the spring pad plugging one end of each of the guide posts. A plate on the end fitting grill that has a hole for fluid discharge partially plugs the other end of the guide post. Pressurized water coolant that fills the guide post volume acts as a shock absorber and should the reactor core receive a major seismic or other shock, the fuel assembly is compelled to move towards a pad depending from a transversely disposed support grid. The pad bears against the spring pad and the plunger progressively blocks the orifices provided by slots in the guide posts thus gradually absorbing the applied shock. After the orifice has been completely blocked, controlled fluid discharge continues through a hole coil spring cooperating in the attenuation of the shock. (author)

  5. Simulated nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Berta, V.T.

    1993-01-01

    An apparatus for electrically simulating a nuclear reactor fuel assembly. It includes a heater assembly having a top end and a bottom end and a plurality of concentric heater tubes having electrical circuitry connected to a power source, and radially spaced from each other. An outer target tube and an inner target tube is concentric with the heater tubes and with each other, and the outer target tube surrounds and is radially spaced from the heater tubes. The inner target tube is surrounded by and radially spaced from the heater tubes and outer target tube. The top of the assembly is generally open to allow for the electrical power connection to the heater tubes, and the bottom of the assembly includes means for completing the electrical circuitry in the heater tubes to provide electrical resistance heating to simulate the power profile in a nuclear reactor. The embedded conductor elements in each heater tube is split into two halves for a substantial portion of its length and provided with electrical isolation such that each half of the conductor is joined at one end and is not joined at the other end

  6. Communication links for fusion reactor maintenance operations

    International Nuclear Information System (INIS)

    Van Uffelen, M.

    2005-01-01

    Different architectures are envisaged for data transmission with fibre optic links in a radiation environment, as proposed in literature for both space and high energy physics applications. Their needs and constraints differ from those encountered for maintenance tasks in the future ITER environment, not only in terms of temperature and radiation levels, but also with respect to transmission speed requirements. Our approach attempts to limit the use of radiation-sensitive electronics for transmission of both digital and/or analogue data to the control room, using glass fibres as transport medium. We therefore assessed the radiation behaviour of a cost-effective fibre optic transmitter at 850 nm, consisting of a PWM (pulse width modulator), a radiation tolerant current driver (previously developed at SCK-CEN) and a VCSEL (Vertical-Cavity Surface Emitting Laser assembly, up to 10 MGy at 60 degrees Celsius. The PWM enables to transform an analogue sensor signal into a pseudo numerical signal, with a pulse width proportional to the incoming signal. The main objective of this task is to contribute to the major design of the maintenance equipment and strategy needed for the remote replacement of the divertor system in the future ITER fusion reactor, with particular attention to the implications of radiation hardening rules and recommendations. Next to the radiation assessment studies of remote handling tools, including actuators and sensors, we also develop radiation tolerant communication links with multiplexing capabilities

  7. Remote maintenance for fusion experimental reactor

    International Nuclear Information System (INIS)

    Koizumi, Koichi; Takeda, Nobukazu

    2000-01-01

    Here was introduced on maintenance of reactor core portion operated by remote control among maintenance of the International Thermonuclear Experimental Reactor (ITER) begun on its design since 1988 under international cooperation of U.S.A., Europe, Russia and Japan. Every appliances constructing the reactor core portion is necessary to carry out all of their inspection and maintenance by using remote controlled apparatus because of their radiation due to neutron generated by DT combustion of plasma. For engineering design activity (EDA) in ITER, not only design and development of the remote control appliances but also design under consideration of remote maintenance for from structural design of maintained objective appliances to access method to appliances, transportation and preservation method of radiated matters, and out-reactor maintenance in a hot cell, is now under progress. Here were also reported on basic concept on maintenance and conservation of ITER, maintenance design of diverter and blanket with high maintenance frequency and present state on development of maintenance appliances. (G.K.)

  8. Fuel assemblies for nuclear reactors

    International Nuclear Information System (INIS)

    Leclercg, J.

    1985-01-01

    Improvements to guide tubes for the fuel assemblies of light water nuclear reactors, said assemblies being immersed in operation in the cooling water of the core of such a reactor, the guide tubes being of the type made from zircaloy and fixed at their two ends respectively to an upper end part and a lower end part made from stainless steel or Irconel and which incorporate devices for braking the fall of the control rods which they house during the rapid shutdown of the reactor, wherein the said braking devices are constituted by means for restricting the diameter of the guide tubes comprising for each guide tube a zircaloy inner sleeve spot welded to the said guide tube and whose internal diameter permits the passage, with a calibrated clearance, of the corresponding control rod, the sleeve being distributed over the lower portion of each guide tube and associated with orifices made in the actual guide tubes to produce the progressive hydraulic absorption of the end of the fall of the control rods

  9. A trolley mounted magazine for reactor maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Brennan, P.J.; Madani, M.; Ridgway, G.H. [GE Hitachi Nuclear Energy Canada, Peterborough, Ontario (Canada)], E-mail: patrick1.brennan@ge.com, mehdi.madani@ge.com, guy.ridgway@ge.com; Lundy, E.; Knight, D. [IM and CS (Inspection, Maintenance and Commerical Services), Ontario Power Generation, Ajax, Ontario (Canada)], E-mail: erroll.lundy@opg.com, david.knight@opg.com

    2009-03-15

    This paper describes the design of a mechanism incorporating a rotary magazine to be mounted on a fuelling machine transport trolley for use at a Darlington reactor during a feeder replacement or maintenance outage. The magazine stores reactor channel maintenance components, such as channel isolation plugs and vented closure plugs, in twelve available magazine channels. Use of the magazine rather than a fuelling machine reduces the time required to transfer such components between the Central Service Area and reactor channels. Component transfers are accomplished by locking the fuelling machine onto one of the magazine channels and using a local controller to execute commands received from the fuel handling control system. (author)

  10. A trolley mounted magazine for reactor maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Brennan, P.J.; Madani, M.; Ridgway, G.H., E-mail: patrick1.brennan@ge.com, E-mail: mehdi.madani@ge.com, E-mail: guy.ridgway@ge.com [GE Hitachi Nuclear Energy Canada, Peterborough, Ontario (Canada); Lundy, E.; Knight, D., E-mail: erroll.lundy@opg.com, E-mail: david.knight@opg.com [Ontario Power Generation, Inspection, Maintenance and Commercial Services, Ajax, Ontario (Canada)

    2008-07-01

    This paper describes the design of a mechanism incorporating a rotary magazine to be mounted on a fuelling machine transport trolley for use at a Darlington reactor during a feeder replacement or maintenance outage. The magazine stores reactor channel maintenance components, such as channel isolation plugs and vented closure plugs, in twelve available magazine channels. Use of the magazine rather than a fuelling machine reduces the time required to transfer such components between the Central Service Area and reactor channels. Component transfers are accomplished by locking the fuelling machine onto one of the magazine channels and using a local controller to execute commands received from the fuel handling control system. (author)

  11. A trolley mounted magazine for reactor maintenance

    International Nuclear Information System (INIS)

    Brennan, P.J.; Madani, M.; Ridgway, G.H.; Lundy, E.; Knight, D.

    2009-01-01

    This paper describes the design of a mechanism incorporating a rotary magazine to be mounted on a fuelling machine transport trolley for use at a Darlington reactor during a feeder replacement or maintenance outage. The magazine stores reactor channel maintenance components, such as channel isolation plugs and vented closure plugs, in twelve available magazine channels. Use of the magazine rather than a fuelling machine reduces the time required to transfer such components between the Central Service Area and reactor channels. Component transfers are accomplished by locking the fuelling machine onto one of the magazine channels and using a local controller to execute commands received from the fuel handling control system. (author)

  12. A trolley mounted magazine for reactor maintenance

    International Nuclear Information System (INIS)

    Brennan, P.J.; Madani, M.; Ridgway, G.H.; Lundy, E.; Knight, D.

    2008-01-01

    This paper describes the design of a mechanism incorporating a rotary magazine to be mounted on a fuelling machine transport trolley for use at a Darlington reactor during a feeder replacement or maintenance outage. The magazine stores reactor channel maintenance components, such as channel isolation plugs and vented closure plugs, in twelve available magazine channels. Use of the magazine rather than a fuelling machine reduces the time required to transfer such components between the Central Service Area and reactor channels. Component transfers are accomplished by locking the fuelling machine onto one of the magazine channels and using a local controller to execute commands received from the fuel handling control system. (author)

  13. Maintenance and material aspects of DREAM reactor

    International Nuclear Information System (INIS)

    Ueda, S.; Nishio, S.; Yamada, R.; Seki, Y.; Kurihara, R.; Adachi, J.; Yamazaki, S.

    2000-01-01

    A concept of a commercial fusion power reactors (Fusion Power: 5.5 GW, electric output: 2.7 GW) having high environmental safety, high thermal efficiency and high availability has been studied in JAERI. The gross reactor configuration was designed to achieve good maintainability, high performance breeding blanket, high efficient power generation system and little radwastes. Design was based on the use of low activation structural material (SiC/SiC composites) and helium as a coolant. In this paper, maintenance and material aspects of DREAM reactor design is discussed. The concluding remarks are as follows. (1) The difficulty of development of maintenance tool is alleviated by sector replacement and the radiation dose environment less than 10 Gy/h in a reactor chamber. (2) Design requirement and present status of SiC/SiC composites was investigated. (3) The SiC/SiC composite development program is planned to satisfy the requirements of DREAM reactor

  14. RA reactor operation and maintenance

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-02-01

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air

  15. Plant maintenance and advanced reactors, 2006

    Energy Technology Data Exchange (ETDEWEB)

    Agnihotri, Newal (ed.)

    2006-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Advanced plants to meet rising expectations, by John Cleveland, International Atomic Energy Agency, Vienna; A flexible and economic small reactor, by Mario D. Carelli and Bojan Petrovic, Westinghouse Electric Company; A simple and passively safe reactor, by Yury N. Kuznetsov, Research and Development Institute of Power Engineering (NIKIET), Russia; Gas-cooled reactors, by Jeffrey S. Merrifield, U.S. Nuclear Regulatory Commission; ISI project managment in the PRC, by Chen Chanbing, RINPO, China; and, Fort Calhoun refurbishment, by Sudesh Cambhir, Omaha Public Power District.

  16. Nuclear reactor fuel sub-assemblies

    International Nuclear Information System (INIS)

    Dodd, J.A.

    1981-01-01

    An improved fuel sub-assembly for a liquid metal cooled fast breeder reactor, is described, in which fatigue damage due to buffeting by cross-current flows is reduced and protection is provided against damage by contact with other reactor structures during loading and unloading of the sub-assembly. (U.K.)

  17. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  18. Liquid Metal Fast Breeder Reactor plant maintenance and equipment design

    International Nuclear Information System (INIS)

    Swannack, D.L.

    1982-01-01

    This paper provides a summary of maintenance equipment considerations and actual plant handling experiences from operation of a sodium-cooled reactor, the Fast Flux Test Facility (FFTF). Equipment areas relating to design, repair techniques, in-cell handling, logistics and facility services are discussed. Plant design must make provisions for handling and replacement of components within containment or allow for transport to an ex-containment area for repair. The modular cask assemblies and transporter systems developed for FFTF can service major plant components as well as smaller units. The plant and equipment designs for the Clinch River Breeder Reactor (CRBR) plant have been patterned after successful FFTF equipment

  19. Fusion reactor remote maintenance study. Final report

    International Nuclear Information System (INIS)

    Sniderman, M.

    1979-04-01

    An analysis of a major maintenance operation, the remote replacement of a modular sector of a tokamak reactor, was performed in substantial detail. Specific assumptions were developed which included concepts from various existing designs so that the operation which was studied includes some design features generic to any fusion reactor design. Based on the work performed in this study, the principal conclusions are: (1) It appears feasible to design a tokamak fusion reactor plant with availability comparable to existing fossil and fission plants, but this will require diligence and comprehensive planning during the complete design phase. (2) Since the total fusion program is paced by the success of each device, maintenance considerations must be incorporated into each device during design, even if the device is an experimental unit. (3) Innovative approaches, such as automatic computer controlled operations, should be developed so that large step reductions in planned maintenance times can be achieved

  20. Fuel assembly for a nuclear reactor

    International Nuclear Information System (INIS)

    Gjertsen, R.K.; Tower, S.N.; Huckestein, E.A.

    1982-01-01

    A fuel assembly for a nuclear reactor comprises a 5x5 array of guide tubes in a generally 20x20 array of fuel elements, the guide tubes being arranged to accommodate either control rods or water displacer rods. The fuel assembly has top and bottom Inconel (Registered Trade Mark) grids and intermediate Zircaloy grids in engagement with the guide tubes and supporting the fuel elements and guide tubes while allowing flow of reactor coolant through the assembly. (author)

  1. Lateral restraint assembly in a nuclear reactor

    International Nuclear Information System (INIS)

    Brown, S.J.; Gorholt, W.

    1977-01-01

    A lateral restraint assembly is described for a reactor of, for example, the high temperature gas-cooled type which commonly includes a reactor core of relatively complex construction supported within a shell or vessel providing a shielded cavity for containing the reactor core. (U.K.)

  2. FFTF reactor assembly system technology

    International Nuclear Information System (INIS)

    Mangelsdorf, T.A.

    1975-01-01

    An overview is presented of the FFTF reactor and plant together with descriptions of core components, core internals, core system, primary and secondary control rod system, reactor instrumentation, reactor vessel and closure head, and supporting test programs

  3. Reactor technology: power conversion systems and reactor operation and maintenance

    International Nuclear Information System (INIS)

    Powell, J.R.

    1977-01-01

    The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He 3 reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored

  4. Nuclear reactor fuel assembly grid

    International Nuclear Information System (INIS)

    Alder, J.L.; Kmonk, S.; Racki, F.R.

    1981-01-01

    A grid for a nuclear reactor fuel assembly which includes intersecting straps arranged to form a structure of egg crate configuration. The cells defined by the intersecting straps are adapted to contain axially extending fuel rods, each of which occupy one cell, while each control rod guide tube or thimble occupies the space of four cells. To effect attachment of each guide thimble to the grid, a short intermediate sleeve is brazed to the strap walls and the guide thimble is then inserted therein and mechanically secured to the sleeve walls. Each sleeve preferably, although not necessarily, is equipped with circumferentially spaced openings useful in adjusting dimples and springs in adjacent cells. To accurately orient each sleeve in position in the grid, the ends of straps extending in one direction project through transversely extending straps and terminate in the wall of the guide sleeve. Other straps positioned at right angles thereto terminate in that portion of the wall of a strap which lies next to a wall of the sleeve

  5. Fuel assembly for a nuclear reactor

    International Nuclear Information System (INIS)

    Gjertsen, R.K.

    1982-01-01

    A fuel assembly in a nuclear reactor comprises a locking mechanism that is capable of locking the fuel assembly to the core plate of a nuclear reactor to prevent inadvertent movement of the fuel assembly. The locking mechanism comprises a ratchet mechanism 108 that allows the fuel assembly to be easily locked to the core plate but prevents unlocking except when the ratchet is disengaged. The ratchet mechanism is coupled to the locking mechanism by a rotatable guide tube for a control rod or water displacer rod. (author)

  6. Nuclear reactor fuel sub-assemblies

    International Nuclear Information System (INIS)

    Ford, J.; Bishop, J.F.W.

    1981-01-01

    An improved fuel sub-assembly for liquid metal cooled fast breeder nuclear reactors is described which facilitates dismantling operations for reprocessing purposes. The method of dismantling is described. (U.K.)

  7. Fuel assemblies for use in nuclear reactors

    International Nuclear Information System (INIS)

    Schluderberg, D.C.

    1981-01-01

    A fuel assembly for use in pressurized water cooled nuclear fast breeder reactors is described in which moderator to fuel ratios, conducive to a high Pu-U-D 2 O reactor breeding ratio, are obtained whilst at the same time ensuring accurate spacing of fuel pins without the parasitic losses associated with the use of spacer grids. (U.K.)

  8. Reactor Coolant Pump Motor Maintenance Experience in Krsko NPP

    International Nuclear Information System (INIS)

    Vukovic, J.; Besirevic, A.; Boljat, Z.

    2016-01-01

    After thirty years of service as well as maintenance in Krsko NPP both original Reactor Coolant Pump (RCP) motors are remanufactured by original vendor Westinghouse and a new one was purchased. Design function of the RCP motor is to drive Reactor Coolant Pump and for coast-down feature during Design Basis Accident. This paper will give a view on maintenance issues of RCP motor during the thirty years of service and maintenance in Krsko NPP to be kept functionally operational. During the processes of remanufacturing inspection and disassembly it was made possible to get a deeper perspective in the motor condition and the wear or fatigue of the motor parts. Parameters like bearing & winding temperature, absolute and relative vibration greatly affect motor operation if not kept inside design margins. Rotational speed causes heat generation at the bearings which is then associated with oil temperatures and as a consequence bearing temperatures. That is why the most critical parts of the motor are the components of upper and lower bearing assembly. The condition of motor stator and rotor assembly technical characteristics shall be explained with respect to influence of demanding environmental conditions that the motor is exposed. Assessment shall be made how does the wear of critical RCP motor parts can influence reliable performance of the motor if not maintained in proper way. Information on upgrades that were done on RCP motor shall be shared: Oil Spillage Protection System (OSPS), Stator upgrades, Dynamic Port, etc. (author).

  9. Scanning tunneling microscope assembly, reactor, and system

    Science.gov (United States)

    Tao, Feng; Salmeron, Miquel; Somorjai, Gabor A

    2014-11-18

    An embodiment of a scanning tunneling microscope (STM) reactor includes a pressure vessel, an STM assembly, and three spring coupling objects. The pressure vessel includes a sealable port, an interior, and an exterior. An embodiment of an STM system includes a vacuum chamber, an STM reactor, and three springs. The three springs couple the STM reactor to the vacuum chamber and are operable to suspend the scanning tunneling microscope reactor within the interior of the vacuum chamber during operation of the STM reactor. An embodiment of an STM assembly includes a coarse displacement arrangement, a piezoelectric fine displacement scanning tube coupled to the coarse displacement arrangement, and a receiver. The piezoelectric fine displacement scanning tube is coupled to the coarse displacement arrangement. The receiver is coupled to the piezoelectric scanning tube and is operable to receive a tip holder, and the tip holder is operable to receive a tip.

  10. Conceptual design of reactor assembly of prototype fast breeder reactor

    International Nuclear Information System (INIS)

    Selvaraj, A.; Balasubramaniyan, V.; Raghupathy, S.; Elango, D.; Sodhi, B.S.; Chetal, S.C.; Bhoje, S.B.

    1996-01-01

    The conceptual design of Reactor Assembly of 500 MWe Prototype Fast Breeder Reactor (as selected in 1985) was reviewed with the aim of 'simplification of design', 'Compactness of the reactor assembly' and 'ease in construction'. The reduction in size has been possible by incorporating concentric core arrangement, adoption of elastomer seals for Rotatable plugs, fuel handling with one transfer arm type mechanism, incorporation of mechanical sealing arrangement for IHX at the penetration in Inner vessel redan and reduction in number of components. The erection of the components has been made easier by adopting 'hanging' support for roof slab with associated changes in the safety vessel design. This paper presents the conceptual design of the reactor assembly components. (author). 8 figs, 2 tabs

  11. Experience with reactor assembly of FBTR

    International Nuclear Information System (INIS)

    Srinivasan, G.; Ravishankar, K.; Babu, A.; Varadarajan, S.; Arumugam, P.; Sekhar, P.

    2006-01-01

    Reactor Assembly, also called Block Pile, is the heart of FBTR and houses the core, top and lateral shields, control rod drive mechanisms (CRDM), sodium inlet pipe and outlet pipes etc. Two major problems which arose during commissioning were reactor vessel tilt due to convection in cover gas space and failure of inflatable seals. The reactor vessel tilt was solved by Helium injection. Reactor was operated without pressurising the inflatable seals till 2005, when the seals were replaced. Other major problems in the course of twenty years of reactor operation were failure of three CRDM lower parts, Core Cover plate which houses the core thermocouples getting stuck in the fuel handling position, water leaks from the Biological Shield Cooling (BSC) coils around the reactor, failure of core wires in the trailing cables during fuel handling etc. This paper addresses the major problems faced and modifications carried out. (author)

  12. Virtual maintenance technology for reactor system based on PPR technology

    International Nuclear Information System (INIS)

    Wu Yaxiang; Ma Baiyong

    2009-01-01

    Based on the Product, Process and Resources (PPR) technology, the establishing technology of virtual maintenance environment for the reactor system and the process structure tree for virtual maintenance is studied, and the flow for the maintainability design and simulation for reactor system is put forward. Based on the subsection simulation of maintenance process and layered design of maintenance actions, the leveled structure of the reactor system virtual maintenance task is studied. The relation for the data of product, process and resource is described by Plan Evaluation and Review Technology (PERT) diagram to define the maintenance operation. (authors)

  13. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  14. Safe operation and maintenance of research reactor

    International Nuclear Information System (INIS)

    Munsorn, S.

    1999-01-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U 3 O 8 - Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  15. Fuel assembly for FBR type reactor and reactor core thereof

    International Nuclear Information System (INIS)

    Kobayashi, Kaoru.

    1998-01-01

    The present invention provides a fuel assembly to be loaded to a reactor core of a large sized FBR type reactor, in which a coolant density coefficient can be reduced without causing power peaking in the peripheral region of neutron moderators loaded in the reactor core. Namely, the fuel assembly for the FBR type reactor comprises a plurality of fission product-loaded fuel rods and a plurality of fertile material-loaded fuel rods and one or more rods loading neutron moderators. In this case, the plurality of fertile material-loaded fuel rods are disposed to the peripheral region of the neutron moderator-loaded rods. The plurality of fission product-loaded fuel rods are disposed surrounding the peripheral region of the plurality of fertile material-loaded fuel rods. The neutron moderator comprises zirconium hydride, yttrium hydride and calcium hydride. The fission products are mixed oxide fuels. The fertile material comprises depleted uranium or natural uranium. (I.S.)

  16. Fuel assembly and reactor core

    International Nuclear Information System (INIS)

    Moriwaki, Masanao; Aoyama, Motoo; Masumi, Ryoji; Ishibashi, Yoko.

    1995-01-01

    A fuel assembly comprises a plurality of fuel rods filled with nuclear fuels, a plurality of burnable poison-incorporated fuel rods and a spectral shift-type water rod. As the burnable poison for the burnable poison-incorporated fuel rod, a plurality of burnable poison elements each having a different neutron absorption cross section are used. A burnable poison element such as boron having a relatively small neutron absorbing cross section is disposed more in the upper half region than the lower half region of the burnable poison-incorporated fuel rods. In addition, a burnable poison element such as gadolinium having a relatively large neutron absorbing cross section is disposed more in the lower half-region than the upper half region thereof. This can flatten the power distribution in the vertical direction of the fuel assembly and the power distribution in the horizontal direction at the final stage of the operation cycle. (I.N.)

  17. Fuel assembly and reactor core

    International Nuclear Information System (INIS)

    Ishibashi, Yoko; Aoyama, Motoo; Oyama, Jun-ichi; Masumi, Ryoji; Soneda, Hideo.

    1994-01-01

    A fuel assembly comprises a plurality of fuel rods filled with nuclear fuels, a plurality of burnable poison rods incorporated with burnable poisons, and water rods which can vary the height in the tube depending on the coolant flow rate flown into the assembly. The amount of entire burnable poisons of the burnable poison-containing rods in adjacent with the water rods is smaller than the amount of entire burnable poisons in the burnable poison containing rods not in adjacent with the water rods. Then the average concentration of burnable poisons in the axial upper half region is made smaller than the average concentration of the burnable poisons at the axial lower half region. Further, a burnable poison concentration at the upper half region of at least one of burnable poison-containing rods in adjacent with the water rods is made lower than the burnable poison concentration in the lower half region. Since this can fasten the combustion of the burnable poisons, a fuel assembly having good fuel economy can be attained. (I.N.)

  18. Reactor core and control rod assembly in FBR type reactor

    International Nuclear Information System (INIS)

    Fujimura, Koji; Kawashima, Katsuyuki; Itooka, Satoshi.

    1993-01-01

    Fuel assemblies and control rod assemblies are attached respectively to reactor core support plates each in a cantilever fashion. Intermediate spacer pads are disposed to the lateral side of a wrapper tube just above the fuel rod region. Intermediate space pads are disposed to the lateral side of a control rod guide tube just above a fuel rod region. The thickness of the intermediate spacer pad for the control rod assembly is made smaller than the thickness of the intermediate spacer pad for the fuel assembly. This can prevent contact between intermediate spacer pads of the control guide tube and the fuel assembly even if the temperature of coolants is elevated to thermally expand the intermediate spacer pad, by which the radial displacement amount of the reactor core region along the direction of the height of the control guide tube is reduced substantially to zero. Accordingly, contribution of the control rod assembly to the radial expansion reactivity can be reduced to zero or negative level, by which the effect of the negative radial expansion reactivity of the reactor is increased to improve the safety upon thermal transient stage, for example, loss of coolant flow rate accident. (I.N.)

  19. Nuclear reactor fuel assembly spacer grids

    International Nuclear Information System (INIS)

    Jabsen, F.S.

    1977-01-01

    Designs of nuclear reactor fuel assembly spacer grids for supporting and spacing fuel elements are described which do not utilize resilient grid plate protrusions in the peripheral band but retain the advantages inherent in the combination resilient and rigid protrusion cells. (U.K.)

  20. Lateral restraint assembly for reactor core

    Science.gov (United States)

    Gorholt, Wilhelm; Luci, Raymond K.

    1986-01-01

    A restraint assembly for use in restraining lateral movement of a reactor core relative to a reactor vessel wherein a plurality of restraint assemblies are interposed between the reactor core and the reactor vessel in circumferentially spaced relation about the core. Each lateral restraint assembly includes a face plate urged against the outer periphery of the core by a plurality of compression springs which enable radial preloading of outer reflector blocks about the core and resist low-level lateral motion of the core. A fixed radial key member cooperates with each face plate in a manner enabling vertical movement of the face plate relative to the key member but restraining movement of the face plate transverse to the key member in a plane transverse to the center axis of the core. In this manner, the key members which have their axes transverse to or subtending acute angles with the direction of a high energy force tending to move the core laterally relative to the reactor vessel restrain such lateral movement.

  1. Equations of macrotransport in reactor fuel assemblies

    International Nuclear Information System (INIS)

    Sorokin, A.P.; Zhukov, A.V.; Kornienko, Yu.N.; Ushakov, P.A.

    1986-01-01

    The rigorous statement of equations of macrotransport is obtained. These equations are bases for channel-by-channel methods of thermohydraulic calculations of reactor fuel assemblies within the scope of the model of discontinuous multiphase coolant flow (including chemical reactions); they also describe a wide range of problems on thermo-physical reactor fuel assembly justification. It has been carried out by smoothing equations of mass, momentum and enthalpy transfer in cross section of each phase of the elementary fuel assembly subchannel. The equation for cross section flows is obtaind by smoothing the equation of momentum transfer on the interphase. Interaction of phases on the channel boundary is described using the Stanton number. The conclusion is performed using the generalized equation of substance transfer. The statement of channel-by-channel method without the scope of homogeneous flow model is given

  2. Nuclear reactor shutdown control rod assembly

    International Nuclear Information System (INIS)

    Bilibin, K.

    1988-01-01

    This patent describes a nuclear reactor having a reactor core and a reactor coolant flowing therethrough, a temperature responsive, self-actuated nuclear reactor shutdown control rod assembly, comprising: an upper drive line terminating at its lower end with a substantially cylindrical wall member having inner and outer surfaces; a lower drive line having a lower end adapted to be attached to a neutron absorber; a ring movable disposed about the outer surface of the wall member of the upper drive line; thermal actuation means adapted to be in heat exchange relationship with coolant in an associated reactor core and in contact with the ring, and balls located within the openings in the upper drive line. When reactor coolant approaches a predetermined design temperature the actuation means moves the ring sufficiently so that the balls move radially out from the recess and into the space formed by the second portion of the ring thereby removing the vertical support for the lower drive line such that the lower drive line moves downwardly and inserts an associated neutron absorber into an associated reactor core resulting in automatic reduction of reactor power

  3. Remote maintenance considerations for swimming pool tokamak reactor

    International Nuclear Information System (INIS)

    Niikura, S.; Yamada, M.; Kasai, M.

    1983-01-01

    Swimming Pool Tokamak Reactor (SPTR) is one of the candidate devices which are expected to demonstrate physical and engineering feasibility for fusion power reactors. In SPTR, water shield is adopted instead of solid shield structures. Among the advantages of SPTR are, from viewpoint of remote maintenance, small handling weight and high space availability between TF coils and a vacuum vessel. On the other hand, high dose rate during reactor repair and adverse effects on remote maintenance equipment by the shielding water might be the disadvantage of SPTR, where it is assumed that the shielding water is drained during reactor repair. Since the design of SPTR is still at the preliminary stage, for remote maintenance, much effort has been directed to clarification of design conditions such as environment and handling weight. As for the remote maintenance system concepts, studies have been focussed on those for a vacuum vessel and its internal structure (blanket, divertor and protection walls) expected to be repaired more frequently. The vacuum vessel assembly is divided into 21 sectors and number of TF coils is 14. A pair of TF coils are connected with each other by antitorque beams on the whole side surface. Vacuum vessel cassettes and associated blanket, divertor and protection walls are replaced through seven windows between TF coils pairs. Therefore each vacuum vessel cassette is required moving mechanisms in toroidal and radial directions. Options for slide mechanisms are wheels, balls, rollers and water bearings. Options for driving the cassette are self-driving by hydraulic motors and external driving by rack-pinion, wires or specific vehicles. As a result of studies, the moving mechanism with wheels and hydraulic motors has been selected for the reference design, and the system with water bearings and rack-pinion as an alternative. Furthermore typical concepts have been obtained for remote maintenance equipment such as wall-mounted manipulators, tools for

  4. Nuclear reactor seismic fuel assembly grid

    International Nuclear Information System (INIS)

    Anthony, A.J.

    1977-01-01

    The strength of a nuclear reactor fuel assembly is enhanced by increasing the crush strength of the zircaloy spacer grids which locate and support the fuel elements in the fuel assembly. Increased resistance to deformation as a result of laterally directed forces is achieved by increasing the section modulus of the perimeter strip through bending the upper and lower edges thereof inwardly. The perimeter strip is further rigidized by forming, in the central portion thereof, dimples which extend inwardly with respect to the fuel assembly. The integrity of the spacer grid may also be enhanced by providing back-up arches for some or all of the integral fuel element locating springs and the strength of the fuel assembly may be further enhanced by providing, intermediate its ends, a steel seismic grid. 13 claims, 6 figures

  5. Fuel assembly and reactor core

    International Nuclear Information System (INIS)

    Masumi, Ryoji; Aoyama, Motoo; Koyama, Jun-ichi; Ishibashi, Yoko; Mochida, Takaaki; Soneda, Hideo.

    1994-01-01

    In a fuel assembly having moderator rods, an axial average value of a ratio between the total of the lateral cross sectional area of a portion to be filled with moderators and the total of the lateral cross sectional area of fuel pellets is determined as greater than 0.4, a lateral cross sectional area of a portion to be filled with moderators per one moderator rod is determined as from 14 to 50cm 2 and the ratio between the total of the lateral cross sectional area of moderators and a total of the lateral cross sectional area of fuel pellets in a horizontal cross section is determined as from 2.7 to 3.4. Since the axial average value for lateral cross sectional area of a portion to be filled with moderators/lateral cross sectional area of fuel pellets is determined as ≥ 0.4, the lateral cross sectional area of moderators of moderator rods is increased, the lateral cross sectional area of a gap water region is decreased to reduce the value of local power peaking coefficient, so that thermal margin is ensured. At least one of the moderating rods is formed as a double-walled water rod tube to enhance an effect of spectral shift by flow rate control, reduce an uranium enrichment degree, and conduct operation without inserting control rods. (N.H.)

  6. Fuel assembly for nuclear reactor

    International Nuclear Information System (INIS)

    Yamanaka, Akihiro; Haikawa, Katsumasa; Haraguchi, Yuko; Nakamura, Mitsuya; Aoyama, Motoo; Koyama, Jun-ichi.

    1996-01-01

    In a BWR type fuel assembly comprising first fuel rods filled with nuclear fission products and second fuel rods filled with burnable poisons and nuclear fission products, the concentration of the burnable poisons mixed to a portion of the second fuel rods is controlled so that it is reduced at the upper portion and increased at the lower portion in the axial direction. In addition, a product of the difference of an average concentration of burnable poisons between the upper portion and the lower portion and the number of fuel rods is determined to higher than a first set value determined corresponding to the limit value of a maximum linear power density. The sum of the difference of the average concentration of the burnable poisons between the upper portion and the lower portion of the second fuel rod and the number of the second fuel rods is determined to lower than a second set value determined corresponding to a required value of a surplus reactivity. If the number of the fuel rods mixed with the burnable poisons is increased, the infinite multiplication factor at an initial stage of the burning is lowered and, if the concentration of the mixed burnable poisons is increased, the time of exhaustion of the burnable poisons is delayed. As a result, the maximum value of the infinite multiplication factor is suppressed thereby enabling to control surplus reactivity. (N.H.)

  7. Fusion reactor horizontal versus vertical maintenance approach

    International Nuclear Information System (INIS)

    Charruyer, Ph.; Djerassi, H.; Leger, D.; Maupou, M.; Rouillard, J.; Salpietro, E.; Holloway, C.; Suppan, A.

    1987-01-01

    This paper concerns the comparison of horizontal versus vertical maintenance options of internal components (blanket and segment) of fusion reactors NET (Next European Torus) and INTOR Design. The described mechanical options are taken to ensure the handling of internals with the required precision, taking into account the problems raised by the safety and confinement requirements. Handling is obviously performed remotely. The option comparisons are performed according to the criteria of feasibility, building size, duration of maintenance operations, safety, flexibility, availability and cost. The first conclusions point on that the vertical handling option offers advantages, as regards the ease of handling and confinement possibilities. From the building size point of view, the two solutions are almost equivalent, while other criteria do not provide a basis for choice. It is emphasized that the confinement option C.T.U. (Containment Transfer Unit) or T.I.C. (Tight Intermediate Confinement) should be the major factor in determining the best options. In additions, a cost comparative analysis emphasizes the best cost/benefit ratio for the different options studied

  8. Nuclear fuel assembly for fast neutron reactors

    International Nuclear Information System (INIS)

    Ilyunin, V.G.; Murogov, V.M.; Troyanov, M.F.; Rinejskij, A.A.; Ustinov, G.G.; Shmelev, A.N.

    1982-01-01

    The fuel assembly of a fast reactor consists of fuel elements comprising sections with fissionable and breeding material and tubes with hollows designed for entrapping gaseous fission products. Tubes joining up to the said sections are divided in a middle and a peripheral group such that at least one of the tube groups is placed in the space behind the coolant inlet ports. The configuration above allows reducing internal overpressure in the fuel assembly, thus reducing the volume of necessary structural elements in the core. (J.B.)

  9. Plant maintenance and advanced reactors issue, 2008

    Energy Technology Data Exchange (ETDEWEB)

    Agnihotri, Newal [ed.

    2009-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

  10. Fuel assemblies for use in nuclear reactors

    International Nuclear Information System (INIS)

    Mochida, Takaaki.

    1987-01-01

    Purpose: To increase the plutonium utilization amount and improve the uranium-saving effect in the fuel assemblies of PWR type reactor using mixed uranium-plutonium oxides. Constitution: MOX fuel rods comprising mixed plutonium-uranium oxides are disposed to the outer circumference of a fuel assembly and uranium fuel rods only composed of uranium oxides are disposed to the central portion thereof. In such a fuel assembly, since the uranium fuel rods are present at the periphery of the control rod, the control rod worth is the same as that of the uranium fuel assembly in the prior art. Further, since about 25 % of the entire fuel rods is composed of the MOX fuel rods, the plutonium utilization amount is increased. Further, since the MOX fuel rods at low enrichment degree are present at the outer circumferential portion, mismatching at the boundary to the adjacent MOX fuel assembly is reduced and the problem of local power peaking increase in the MOX fuel assembly is neither present. (Kamimura, M.)

  11. Fuel assembly for FBR type reactor

    International Nuclear Information System (INIS)

    Hayashi, Hideyuki.

    1995-01-01

    Ordinary sodium bond-type fuel pins using nitride fuels, carbide fuels or metal fuels and pins incorporated with hydride moderators are loaded in a wrapper tube at a ratio of from 2 to 10% based on the total number of fuel pins. The hydride moderators are sealed in the hydride moderator incorporated pins at the position only for a range from the upper end to a reactor core upper position of substantially 1/4 of the height of the reactor core from the upper end of the reactor core as a center. Then, even upon occurrence of ULOF (loss of flow rate scram failure phenomenon), it gives characteristic of reducing the power only by a doppler coefficient and not causing boiling of coolant sodium but providing stable cooling to the reactor core. Therefore, a way of thinking on the assurance of passive safety is simplified to make a verification including on the reactor structure unnecessary. In an LMFBR type reactor using the fuel assembly, a critical experiment for confirming accuracy of nuclear design is sufficient for the item required for study and development, which provides a great economical effect. (N.H.)

  12. Fuel assemblies for BWR type reactors

    International Nuclear Information System (INIS)

    Ishizuka, Takao.

    1981-01-01

    Purpose: To enable effective failed fuel detection by the provision of water rod formed with a connecting section connected to a warmed water feed pipe of a sipping device at the lower portion and with a warmed water jetting port in the lower portion in a fuel assembly of a BWR type reactor to thereby carry out rapid sipping. Constitution: Fuel rods and water rods are contained in the channel box of a fuel assembly, and the water rod is provided at its upper portion with a connecting section connected to the warmed water feed pipe of the sipping device and formed at its lower portion with a warmed water jetting port for jetting warmed water fed from the warmed water feed pipe. Upon detection of failed fuels, the reactor operation is shut down and the reactor core is immersed in water. The cover for the reactor container is removed and the cap of the sipping device is inserted to connect the warmed water feed pipe to the connecting section of the water rod. Then, warmed water is fed to the water rod and jetted out from the warmed water jetting port to cause convection and unify the water of the channel box in a short time. Thereafter, specimen is sampled and analyzed for the detection of failed fuels. (Moriyama, K.)

  13. RA Reactor operation and maintenance (I-IX), Part I

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling

  14. Reconstitutable fuel assembly for a nuclear reactor

    International Nuclear Information System (INIS)

    Ferlan, S.J.; Kmonk, S.; Schallenberger, J.M.

    1982-01-01

    A reconstitutable fuel assembly for a nuclear reactor which includes a mechanical, rather than metallurgical, arrangement for connecting control rod guide thimbles to the top and bottom nozzles of a fuel assembly. Multiple sleeves enclosing control rod guide thimbles interconnect the top nozzle to the fuel assembly upper grid. Each sleeve is secured to the top nozzle by retaining rings disposed on opposite sides of the nozzle. Similar sleeves enclose the lower end of control rod guide thimbles and interconnect the bottom nozzle with the lowermost grid on the assembly. An end plug fitted in the bottom end of each sleeve extends through the bottom nozzle and is secured thereto by a retaining ring. Should it be necessary to remove a fuel rod from the assembly, the retaining rings in either the top or bottom nozzles may be removed to release the nozzle from the control rod guide thimbles and thus expose either the top or bottom ends of the fuel rods to fuel rod removing mechanisms

  15. Removable fuel assembly for nuclear reactor

    International Nuclear Information System (INIS)

    Dubief, J.M.; Bonnamour, M.

    1984-01-01

    To facilitate the replacement of one or more fuel rods, taking into account the fact the operations are remote operations and under several meters of water, the following invention is presented. The fuel assembly is composed of a bundle of canned fuel pencils maintened on a structure which includes ends linked by spacer tubes. These tubes are fixed to one end in such a manner they are removable. For this, the plug of each tube has a plane stop surface on the end part and a conic coupling and guiding plug cooperating with a truncated bearing of the end part. Flat parts made on the cone allow to stop the tube rotating [fr

  16. Development of conductor feedthrough module of LV electrical penetration assembly for research reactors

    International Nuclear Information System (INIS)

    Luo Zhiyuan; Wang Guangjin; Zhou Bin

    2007-01-01

    A LV electrical penetration assembly with perfusion sealing conductor feedthrough module was developed, which can be used for the connection of internal and external cables through the wall of the research reactor workshop. The LV electrical penetration assembly was combined with several independent modules. The maintenance and replacement of the assembly can be easily done in service. The sealing of conductor feedthrough module was achieved with the perfusion of self-extinguishing epoxy. The leakage between the conductor feedthrough module and the end plate module was blocked with rubber rings. The result of the leakage test and the electrical performance test for the samples of conductor feedthrough module satisfied the requirement of research reactor. The structure of the new electrical penetration assembly is simple and compact. It can be manufactured with mature technology and cost low price. The performance of the assembly is steady. It can be used widely in research reactors. (authors)

  17. Comparative evaluation of remote maintenance schemes for fusion DEMO reactor

    Energy Technology Data Exchange (ETDEWEB)

    Utoh, Hiroyasu, E-mail: uto.hiroyasu@jaea.go.jp; Tobita, Kenji; Someya, Youji; Asakura, Nobuyuki; Sakamoto, Yoshiteru; Hoshino, Kazuo; Nakamura, Makoto

    2015-10-15

    Highlights: • Various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. • The banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme. • The key engineering issues are in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability. - Abstract: Maintenance schemes are one of the critical issues in DEMO design, significantly affecting the configuration of in-vessel components, the size of toroidal field (TF) coil, the arrangement of poloidal field (PF) coils, reactor building, hot cell and so forth. Therefore, the maintenance schemes should satisfy many design requirements and criteria to assure reliable and safe plant operation and to attain reasonable plant availability. The plant availability depends on reliability of remote maintenance scheme, inspection of pipe connection and plasma operation. In this paper, various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. From the view points of the reliability of inspection on hot cell, TF coil size, stored energy of PF coil and portability of segment, the banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme, and it has key engineering issues such as in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability.

  18. Comparative evaluation of remote maintenance schemes for fusion DEMO reactor

    International Nuclear Information System (INIS)

    Utoh, Hiroyasu; Tobita, Kenji; Someya, Youji; Asakura, Nobuyuki; Sakamoto, Yoshiteru; Hoshino, Kazuo; Nakamura, Makoto

    2015-01-01

    Highlights: • Various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. • The banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme. • The key engineering issues are in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability. - Abstract: Maintenance schemes are one of the critical issues in DEMO design, significantly affecting the configuration of in-vessel components, the size of toroidal field (TF) coil, the arrangement of poloidal field (PF) coils, reactor building, hot cell and so forth. Therefore, the maintenance schemes should satisfy many design requirements and criteria to assure reliable and safe plant operation and to attain reasonable plant availability. The plant availability depends on reliability of remote maintenance scheme, inspection of pipe connection and plasma operation. In this paper, various remote maintenance schemes for DEMO were comparatively assessed based on requirements for DEMO remote maintenance. From the view points of the reliability of inspection on hot cell, TF coil size, stored energy of PF coil and portability of segment, the banana shape segment transport using all vertical maintenance ports would be more probable DEMO reactor maintenance scheme, and it has key engineering issues such as in-vessel transferring mechanism of segment, pipe connection and conducting shell design for plasma vertical stability.

  19. Fuel assembly and nuclear reactor core

    International Nuclear Information System (INIS)

    Masumi, Ryoji; Aoyama, Motoo; Yamashita, Jun-ichi.

    1995-01-01

    The present invention concerns a fuel assembly and a nuclear reactor core capable of improving a transmutation rate of transuranium elements while improving a residual rate of fission products. In a reactor core of a BWR type reactor to which fuel rods with transuranium elements (TRU) enriched are loaded, the enrichment degree of transuranium elements occupying in fuel materials is determined not less than 2wt%, as well as a ratio of number of atoms between hydrogen and fuel heavy metals in an average reactor core under usual operation state (H/HM) is determined not more than 3 times. In addition, a ratio of the volumes between coolant regions and fuel material regions is determined not more than 2 times. A T ratio (TRU/Pu) is lowered as the TRU enrichment degree is higher and the H/HM ratio is lower. In order to reduce the T ratio not more than 1, the TRU enrichment degree is determined as not less than 2wt%, and the H/HM ratio is determined to not more than 3 times. Accordingly, since the H/HM ratio is reduced to not more than 1, and TRU is transmuted while recycling it with plutonium, the transmutation ratio of transuranium elements can be improved while improving the residual rate of fission products. (N.H.)

  20. Reactor installation and maintenance for the Advanced Neutron Source

    International Nuclear Information System (INIS)

    Smith, B.R.

    1993-01-01

    Advanced Neutron Source (ANS) reactor assembly components have been modeled in great detail in IGRIP in order to realistically simulate preliminary installation and maintenance processes. Animation of these processes has been captured in a 15-minute video with narration. Approximately 90% of the parts were initially translated from CADAM (a two-dimensional drawing package) to IGRIP and then revolved or extruded. IGRIP's IGES translator greatly reduced the time required to perform this operation. The interfacing of devices in the work cell has identified numerous design inconsistencies. Most of the modeled reactor components are devices with a single degree of freedom (DOF) however, some of the slanted experiments required 6 DOF so that they could be removed at an angle in order to clear the reflector vessel flanges. IGRIP's collision detection feature proved to be extremely helpful in determining interferences when removing the experiments. The combination of three-dimensional visualization and collision detection allows engineers to clearly and easily visualize potential design problems before the construction phase of the project

  1. Fuel assembly transfer and storage system for nuclear reactors

    International Nuclear Information System (INIS)

    Allain, Albert; Thomas, Claude.

    1981-01-01

    Transfer and storage system on a site comprising several reactors and at least one building housing the installations common to all these reactors. The system includes: transfer and storage modules for the fuel assemblies comprising a containment capable of containing several assemblies carried on a transport vehicle, a set of tracks for the modules between the reactors and the common installations, handling facilities associated with each reactor for moving the irradiated assemblies from the reactor to a transfer module placed in loading position on a track serving the reactor and conversely to move the new assemblies from the transfer module to the reactor, and at least one handling facility located in the common installation building for loading the modules with new assemblies [fr

  2. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  3. A remote maintenance robot system for a pulsed nuclear reactor

    International Nuclear Information System (INIS)

    Thunborg, S.

    1987-01-01

    This paper presents a remote maintenance robot system for use in a hazardous environment. The system consists of turntable, robot and hoist subsystems which operate under the control of a supervisory computer to perform coordinated programmed maintenance operations on a pulsed nuclear reactor. The system is operational

  4. Scheduling and recording of reactor maintenance and testing by computer

    International Nuclear Information System (INIS)

    Gray, P.L.

    1975-01-01

    The use of a computer program, Maintenance Information and Control (MIAC), at the Savannah River Laboratory (SRL) assists a small operating staff in maintaining three research reactors and a subcritical facility. The program schedules and defines preventive maintenance, schedules required periodic tests, logs repair and cost information, specifies custodial and service responsibilities, and provides equipment maintenance history, all with a minimum of record-keeping

  5. Oak Ridge Research reactor shutdown maintenance and surveillance

    International Nuclear Information System (INIS)

    Coleman, G.H.; Laughlin, D.L.

    1991-05-01

    The Department of Energy ordered the Oak Ridge Research Reactor to be placed in permanent shutdown on July 14, 1987. The paper outlines routine maintenance activities and surveillance tests performed April through September, 1990, on the reactor instrumentation and controls, process system, and the gaseous waste filter system. Preparations are being made to transfer the facility to the Remedial Action Program. 6 tabs

  6. Maintenance viewpoint of a successful reactor program

    International Nuclear Information System (INIS)

    Moffitt, W.C.; Grygiel, M.L.

    1984-05-01

    As the Operating and Support staffs of the FFTF organization have gained experience, the plant reliability and capacity factors have shown a steadily improving trend. The plant capacity factor for Cycle 4 was 99.5%. It is the purpose of this report to describe the evolution of the maintenance organization at the FFTF site from a general support organization to a technically proficient organization playing a major role in planning and performance of plant maintenance evolutions

  7. Repair/maintenance design for tokamak experimental fusion reactor

    International Nuclear Information System (INIS)

    1978-10-01

    Repair and maintenance design for JXFR has been studied. The reactor is in eight modules so that a damaged module alone can be separated from the other modules and transferred from the reactor room to a repair shop. Design work covers overhaul procedure, dismounting equipments (overhead cranes, auto welder/cutter and remote handling equipments), transport system of a module (module mounting carriages and rotating carriage), repair equipment for blanket, earthquake-proof analysis of the reactor, reactor room structure, repair shop layout, management of radioactive wastes, time and the number of persons required for overhaul etc. Though the repair and maintenance system is almost complete, there still remain problems for further study in joints of blanket cooling piping, auto welder/cutter and earthquake-proof strength in reactor disassemblage. More detailed studies and R and D are necessary for engineering perfection. (author)

  8. RA reactor operation and maintenance in 1996, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1996-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. Since the RA reactor is shutdown since 1984, it is high time for decision making of its future status. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown. Control and maintenance of the reactor instrumentation and devices was done regularly but dependent on the availability of the spare parts and financial means. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  9. Nuclear reactor fuel element sub-assemblies

    International Nuclear Information System (INIS)

    Hill, G.D.; Trevalion, P.A.

    1977-01-01

    A fuel element sub-assembly for a liquid metal cooled fast reactor is described. It comprises a bundle of fuel pins enclosed by a tubular wrapper having a lower end journal for plugging into an upper aperture in a core supporting structure and a spike bar with an articulated bush for engaging a lower aperture in the core supporting structure. The articulated bush is retained on a spherical end portion of the spike bar by a pair of parallel retaining pins arranged transversely and disposed one each side of the spike bar. The pins are tubular and collapsible at a predetermined loading to enable the spherical end portion to pass between them. The articulated bush has an internal groove for engagement by a lifting grab, this groove being formed in a bore for receiving the spherical end portion of the spike bar. The construction lessens liability to rattling of the fuel element sub-assemblies and aids removal for replacement. (U.K.)

  10. Fuel assembly for BWR type reactor

    International Nuclear Information System (INIS)

    Kato, Shigeru.

    1993-01-01

    In the fuel assembly of the present invention, a means for mounting and securing short fuel rods is improved. Not only long fuel rods but also short fuel rods are disposed in channel of the fuel assembly to improve reactor safety. The short fuel rods are supported by a screw means only at the lower end plug. The present invention prevents the support for the short fuel rod from being unreliable due to the slack of the screw by the pressure of inflowing coolants. That is, coolant abutting portions such as protrusions or concave grooves are disposed at a portion in the channel box where coolants flowing from the lower tie plate, as an uprising stream, cause collision. With such a constitution, a component caused by the pressure of the flowing coolants is formed. The component acts as a rotational moment in the direction of screwing the male threads of the short fuel rod into the end plug screw hole. Accordingly, the screw is not slackened, and the short fuel rods are mounted and secured certainly. (I.S.)

  11. Operation and maintenance of 1MW PUSPATI TRIGA reactor

    International Nuclear Information System (INIS)

    Adnan Bokhari; Mohammad Suhaimi Kassim

    2006-01-01

    The Malaysian Research Reactor, Reactor TRIGA PUSPATI (RTP) has been successfully operated for 22 years for various experiments. Since its commissioning in June 1982 until December 2004, the 1MW pool-type reactor has accumulated more than 21143 hours of operation, corresponding to cumulative thermal energy release of about 14083 MW-hours. The reactor is currently in operation and normally operates on demand, which is normally up to 6 hours a day. Presently the reactor core is made up of standard TRIAGA fuel element consists of 8.5 wt%, 12 wt% and 20 wt% types; 20%-enriched and stainless steel clad. Several measures such as routine preventive maintenance and improving the reactor support systems have been taken toward achieving this long successful operation. Besides normal routine utilization like other TRIGA reactors, new strategies are implemented for effective increase in utilization. (author)

  12. Applying principles of Design For Assembly to ITER maintenance operations

    International Nuclear Information System (INIS)

    Heemskerk, Cock; de Baar, Marco; Elzendoorn, Ben; Koning, Jarich; Verhoeven, Toon; Vreede, Fred de

    2009-01-01

    In ITER, maintenance operations in the vessel and in the Hot Cell will be largely done by Remote Handling (RH). Remotely performed maintenance actions tend to be more time-costly than actions performed by direct human access. With a human operator in the control loop and adequate situational feedback, a two-armed master slave manipulator system can mimic direct access with dexterous manipulation, tactile feedback and vision. But even then, turnaround times are still very high. Adapting the design for simplified maintenance operations can yield significant time savings. One of the methods known to produce a simpler, more robust design, which is also better suited for handling with robots, is Design For Assembly (DFA). This paper discusses whether and how the principles of DFA can be applied to simplify maintenance operations for ITER. While DFA is normally used with series-production and ITER is a unique product, it is possible to apply the principles of DFA to ITER maintenance operations. Furthermore, DFA's principles can be applied at different abstraction levels. Combining principles of DFA with Virtual Reality leads to new insights and provides additional value.

  13. Paired replacement fuel assemblies for BWR-type reactor

    International Nuclear Information System (INIS)

    Oguchi, Kazushige.

    1997-01-01

    There are disposed a large-diameter water rod constituting a non-boiling region at a central portion and paired replacement fuel assemblies for two streams having the same average enrichment degree and different amount of burnable poisons. The paired replacement fuel assemblies comprise a first fuel assembly having a less amount of burnable poisons and a second fuel assembly having a larger amount of burnable poisons. A number of burnable poison-containing fuel rods in adjacent with the large diameter water rod is increased in the second fuel assembly than the first fuel assembly. Then, the poison of the paired replacement fuel assemblies for the BWR type reactor can be annihilated simultaneously at the final stage of the cycle. Accordingly, fuels for a BWR type reactor excellent in economical property and safety and facilitating the design of the replacement reactor core can be obtained. (N.H.)

  14. RA Reactor operation and maintenance (I-IX), Part IV, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume contains reports describing maintenance and repair work of the RA reactor instrumentation, equipment of the reactor dosimetry control system, and equipment for regulation and control systems

  15. Maintenance features of the Compact Ignition Tokamak fusion reactor

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Hager, E.R.

    1987-01-01

    The Compact Ignition Tokamak (CIT) is envisaged to be the next experimental machine in the US Fusion Program. Its use of deuterium/tritium fuel requires the implementation of remote handling technology for maintenance and disassembly operations. The reactor is surrounded by a close-proximity nuclear shield which is designed to permit personnel access within the test cell, one day after shutdown. With the shield in place, certain maintenance activities in the cell may be done hands-on. Maintenance on the reactor is accomplished remotely using a boom-mounted manipulator after disassembling the shield. Maintenance within the plasma chamber is accomplished with two articulated boom manipulators that are capable of operating in a vacuum environment. They are stored in a vacuum enclosure behind movable shield plugs

  16. Cost assessment of demo fusion reactor with considering maintenance

    International Nuclear Information System (INIS)

    Hashizume, Hidetoshi; Kitagoh, Kazutoshi

    2003-01-01

    The purpose of this study is to perform cost assessment of nuclear fusion reactors in order to draw up commercial plants. A fusion reactor may have a complex configuration to achieve high beta value, which leads to low and instable availability when maintenance is taken into account. Therefore, reactor's availability must be evaluated with considering the influence of the configuration complexity. Furthermore the availability has the strong impact on COE (Cost of Electricity), that is, a fusion reactor with low availability will not be accepted as a commercial plant. Therefore, we developed a new method to calculate availabilities with random numbers, in which the complexity of reactor's configuration could become considered. In addition, we considered the reduction of superconducting coil's maintenance time by introducing remountable magnet system because the coil maintenance requires quite long time in the present technology. The results show that the availability becomes relatively large if the short maintenance time of coils could be achieved, for example, by remountable magnetic systems. (author)

  17. Augmented Reality Training for Assembly and Maintenance Skills

    Directory of Open Access Journals (Sweden)

    Preusche Carsten

    2011-12-01

    Full Text Available Augmented Reality (AR points out to be a good technology for training in the field of maintenance and assembly, as instructions or rather location-dependent information can be directly linked and/or attached to physical objects. Since objects to maintain usually contain a large number of similar components (e.g. screws, plugs, etc. the provision of location-dependent information is vitally important. Another advantage is that AR-based training takes place with the real physical devices of the training scenario. Thus, the trainee also practices the real use of the tools whereby the corresponding sensorimotor skills are trained.

  18. In-vessel maintenance concepts for tokamak fusion reactors

    International Nuclear Information System (INIS)

    Kelly, V.P.; Berger, J.D.; Yount, J.A.

    1983-01-01

    Concepts for rail-mounted and guided in-vessel handling machines (IVM) for remote maintenance inside tokamak fusion reactors are described. The IVM designs are based on concepts for tethered remotely operated vehicles and feature the use of multiple manipulator arms for remote handling and remote-controlled TV cameras for remote viewing. The concepts include IVMs for both single or dual rail systems located in the top or bottom of the reactor vessel

  19. Conceptual design of nuclear fusion power reactor DREAM. Reactor structures and remote maintenance

    International Nuclear Information System (INIS)

    Nishio, Satoshi; Seki, Yasushi; Ueda, Shuzo; Kurihara, Ryoichi; Adachi, Junichi; Yamazaki, Seiichiro; Hashimoto, Toshiyuki.

    1997-01-01

    Nuclear fusion reactors are required to be able to compete another energy sources in economy, reliability, safety and environmental integrity for commercial use. In the DREAM (DRastically EAsy Maintenance) reactor, a very low activated material of SiC/SiC composite has been introduced for the structural material, a reactor configuration for very easy maintenance and the helium gas of a high temperature for the cooling system, and hence DREAM has been proven to be very attractively as the commercial power reactor due to the high availability and efficiency of the plant and minimization of radioactive wastes. (author)

  20. Results of assembly test of HTTR reactor internals

    International Nuclear Information System (INIS)

    Maruyama, S.; Saikusa, A.; Shiozawa, S.; Tsuji, N.; Miki, T.

    1996-01-01

    The assembly test of the HTTR actual reactor internals had been carried out at the works, prior to their installation in the actual reactor pressure vessel(RPV) at the construction site. The assembly test consists of several items such as examining fabricating precision of each component and alignment of piled-up structures, measuring circumferential coolant velocity profile in the passage between the simulated RPV and the reactor internals as well as under the support plates, measuring by-pass flow rate through gaps between the reactor internals, and measuring the binding force of the core restraint mechanism. Results of the test showed good performance of the HTTR reactor internals. Installation of the reactor internals in the actual RPV was started at the construction site of HTTR in April, 1995. In the installation process, main items of the assembly test at the works were repeated to investigate the reproducibility of installation. (author). 5 refs, 11 figs

  1. Oak Ridge Research Reactor shutdown maintenance and surveillance

    International Nuclear Information System (INIS)

    Coleman, G.H.; Laughlin, D.L.

    1990-10-01

    The Department of Energy ordered the Oak Ridge Research Center Reactor to be placed in permanent shutdown on July 14, 1987. Maintenance activities, both mechanical and instrument, were essentially routine in nature. The performance of the instrumentation for the facility was satisfactory, and maintenance required is provided. The performance of the process system was satisfactory, and maintenance required is indicated. The results of efficiency tests of the various gaseous-waste filters have been summarized and preparations for transfer of the facility to the remedial action program is also indicated

  2. VVANTAGE 6 - an advanced fuel assembly design for VVER reactors

    International Nuclear Information System (INIS)

    Doshi, P.K.; DeMario, E.E.; Knott, R.P.

    1993-01-01

    Over the last 25 years, Westinghouse fuel assemblies for pressurized water reactors (PWR's) have undergone significant changes to the current VANTAGE 5. VANTAGE 5 PWR fuel includes features such as removable top nozzles, debris filter bottom nozzles, low-pressure-drop zircaloy grids, zircaloy intermediate flow mixing grids, optimized fuel rods, in-fuel burnable absorbers, and increased burnup capability to region average values of 48000 MWD/MTU. These features have now been adopted to the VVER reactors. Westinghouse has completed conceptual designs for an advanced fuel assembly and other core components for VVER-1000 reactors known as VANTAGE 6. This report describes the VVANTAGE 6 fuel assembly design

  3. MOX fuel assembly and reactor core

    International Nuclear Information System (INIS)

    Shimada, Hidemitsu; Koyama, Jun-ichi; Aoyama, Motoo

    1998-01-01

    The MOX fuel assembly of the present invention is of a c-lattice type loaded to a BWR type reactor. 74 MOX fuel rods filled with mixed oxides of uranium and plutonium and two water rods disposed to a space equal to that for 7 MOX fuel rods are arranged in 9 x 9 matrix. MOX fuel rods having the lowest enrichment degree are disposed to four corners of the 9 x 9 matrix. The enrichment degree means a ratio of the weight of fission products based on the total weight of fuels. Two MOX fuel rods having the same enrichment degree are arranged in each direction so as to be continuous from the MOX fuel rods at four corners in the direction of the same row and different column and same column and the different row. In addition, among the outermost circumferential portion of the 9 x 9 matrix, MOX fuel rods having a lower enrichment degree next to the MOX fuel rods having the lowest enrichment degree are arranged, each by three to a portion where MOX fuel rods having the lowest enrichment degree are not disposed. (I.N.)

  4. Concept design on RH maintenance of CFETR Tokamak reactor

    International Nuclear Information System (INIS)

    Song, Yuntao; Wu, Songtao; Wan, Yuanxi; Li, Jiangang; Ye, Minyou; Zheng, Jinxing; Cheng, Yong; Zhao, Wenlong; Wei, Jianghua

    2014-01-01

    Highlights: •We discussed the concept design of the RH maintenance system based on the main design work of the key components for CFETR. •The main design work for RH maintenance in this paper was carried out including the divertor RH system, the blanket RH system and the transfer cask system. •The technical problems encountered in the design process were discussed. •The present concept design of remote maintenance system in this paper can meet the physical and engineering requirement of CFETR. -- Abstract: CFETR which stands for Chinese Fusion Engineering Testing Reactor is a superconducting Tokamak device. The concept design on RH maintenance of CFETR has been done in the past year. It is known that, the RH maintenance is one of the most important parts for Tokamak reactor. The fusion power was designed as 50–200 MW and its duty cycle time (or burning time) was estimated as 30–50%. The center magnetic field strength on the TF magnet is 5.0 T, the maximum capacity of the volt seconds provided by center solenoid winding will be about 160 VS. The plasma current will be 10 MA and its major radius and minor radius is 5.7 m and 1.6 m respectively. All the components of CFETR which provide their basic functions must be maintained and inspected during the reactor lifetime. Thus, the remote handling (RH) maintenance system should be a key component, which must be detailedly designed during the concept design processing of CFETR, for the operation of reactor. The main design work for RH maintenance in this paper was carried out including the divertor RH system, the blanket RH system and the transfer cask system. What is more, the technical problems encountered in the design process will also be discussed

  5. Maintenance of a multi-cell field reversed mirror reactor

    International Nuclear Information System (INIS)

    Neef, W.S. Jr.

    1978-01-01

    The Field Reversed Mirror Reactor is composed of a horizontal linear chain of cells, each of which requires neutral beam injection. Blanket replacement is achieved by lifting one complete cell module from the reactor and replacing it with a preassembled and tested identical module. Ioffe bar connectors eliminate redundant bus bars. Asymmetric cell design simplifies magnet construction and reduces replacement time. A tapered cylindrical coolant distributor simplifies blanket removal. An evacuated housing surrounds the reactor reducing cell-to-cell sealing problems related to maintenance. Remote couplings are used for coolant and accessories. Hot-cell location and design permits immediate reconditioning or storage of replacement cells

  6. Remote maintenance design for Fusion Experimental Reactor (FER)

    International Nuclear Information System (INIS)

    Tachikawa, K.; Iida, H.; Nishio, S.; Tone, T.; Aota, T.; Iwamoto, T.; Niikura, S.; Nishizawa, H.

    1984-01-01

    Design of Fusion Experimental Reactor, FER, has been conducted by Japan Atomic Energy Research Institute (JAERI) since 1981. Two typical reactors can be classified in general from the viewpoints of remote maintenance among four design concepts of FER. In the case of the type 1 FER, the torus module consists of shield structure and blanket, and the connective joints between toruses provided at the outer region of the reactor. As for the type 2 FER, the shield structure is joined with the vacuum cryostat, and only the blanket module is allowed to move, but connection between toruses are located in the inner region of the reactor. Comparing type 1 with type 2 FER, this paper describes on the remote maintenance of FER including reactor configurations, work procedures, remote systems/equipments, repairing facility and future R and D problems. Reviewing design studies and investigation for the existing robotics technologies, R and D for FER remote maintenance technology should be performed under the reasonable long-term program. The main items of remote technology required to start urgently are multi-purpose manipulator system with performance of dextrousity, tele-viewing system which reduces operator fatigue and remote tests for commercially available components

  7. Manipulator system for remote maintenance of fusion experimental reactor

    International Nuclear Information System (INIS)

    Shibanuma, Kiyoshi; Munakata, Tadashi; Murakami, Shin; Kondoh, Mitsunori.

    1991-01-01

    We have completed the conceptual design for a rail-mounted vehicle type remote maintenance system for the fusion experimental reactor (FER), which will be the first D-T burning reactor in Japan. We have fabricated a 1/5-scale model and confirmed the feasibility of the design. In this system, a rail is deployed into the vessel and supported at four horizontal ports. A vehicle then moves along the rail and handles in-vessel components with manipulators. The advantages of this concept are the high stiffness and high reliability of the rail, and the high mobility of the vehicle for efficient maintenance operations. In the FER, this concept is considered to be the first option for in-vessel maintenance. This paper describes the conceptual design of the system and the feasibility study using the 1/5-scale model. (author)

  8. RA reactor operation and maintenance in 1994, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1994-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  9. Status of control assembly materials in Indian water reactors

    International Nuclear Information System (INIS)

    Date, V.G.; Kulkarni, P.G.

    2000-01-01

    India's present operating water cooled power reactors comprise boiling water reactors of Tarapur Atomic Power Station (TAPS) and pressurized heavy water reactors (PHWRs) at Kota (RAPS), Kalpakkam (MAPS), Narora (NAPS) and Kakrapara (KAPS). Boiling water reactors of TAPS use boron carbide control blades for control of power as well as for shut down (scram). PHWRs use boron steel and cobalt absorber rods for power control and Cd sandwiched shut off rods (primary shut down system) and liquid poison rods (secondary shut down system) for shut down. In TAPS, Gadolinium rods (burnable poison rods) are also incorporated in fuel assembly for flux flattening. Boron carbide control blades and Gadolinium rods for TAPS, cobalt absorber rods and shut down assemblies for PHWRs are fabricated indigenously. Considerable development work was carried out for evolving material specifications, component and assembly drawings, and fabrication processes. Details of various control and shut off assemblies being fabricated currently are highlighted in the paper. (author)

  10. Design requirements, operation and maintenance of gas-cooled reactors

    International Nuclear Information System (INIS)

    1989-06-01

    At the invitation of the Government of the USA the Technical Committee Meeting on Design Requirements, Operation and Maintenance of Gas-Cooled Reactors, was held in San Diego on September 21-23, 1988, in tandem with the GCRA Conference. Both meetings attracted a large contingent of foreign participants. Approximately 100 delegates from 18 different countries participated in the Technical Committee meeting. The meeting was divided into three sessions: Gas-cooled reactor user requirement (8 papers); Gas-cooled reactor improvements to facilitate operation and maintenance (10 papers) and Safety, environmental impacts and waste disposal (5 papers). A separate abstract was prepared for each of these 23 papers. Refs, figs and tabs

  11. Support a nuclear fuel assembly in a reactor

    International Nuclear Information System (INIS)

    Leclercq, J.

    1985-01-01

    The device has to maintain the assemblies with regard to a horizontal plate of the core. The assemblies, having the same section, are arranged side by side in a regular polygonal lattice and each asssembly is, either equipped with at least two zones to receive the rods which are vertically inserted and maintained during the reactor operation, or beside an assembly which is equipped. The device has two sets comprising each one at least one deformable locking element and a rigid element which raches with it, one fixed to the fuel assembly and the other fixed to a horizontal plate attached to the reactor core, positioned so that inserting a fuel rod into an emplacement in the fuel assembly deforms the bolt transversally to lock it with the rigid piece. The invention can be applied to water moderated reactors [fr

  12. Maintenance of fission and fusion reactors. 10. workshop on fusion reactor engineering

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This report contains copies of OHP presented at the title meeting. The presented topics are as follows, maintenance of nuclear power plants and ITER, exchange of shroud in BWR type reactors, deterioration of fission and fusion reactor materials, standards of pressure vessels, malfunction diagnosis method with neural network. (J.P.N.)

  13. Kinetic analysis of sub-prompt-critical reactor assemblies

    International Nuclear Information System (INIS)

    Das, S.

    1992-01-01

    Neutronic analysis of safety-related kinetics problems in experimental neutron multiplying assemblies has been carried out using a sub-prompt-critical reactor model. The model is based on the concept of a sub-prompt-critical nuclear reactor and the concept of instantaneous neutron multiplication in a reactor system. Computations of reactor power, period and reactivity using the model show excellent agreement with results obtained from exact kinetics method. Analytic expressions for the energy released in a controlled nuclear power excursion are derived. Application of the model to a Pulsed Fast Reactor gives its sensitivity between 4 and 5. (author). 6 refs., 4 figs., 1 tab

  14. Automatic coolant flow control device for a nuclear reactor assembly

    Science.gov (United States)

    Hutter, Ernest

    1986-01-01

    A device which controls coolant flow through a nuclear reactor assembly comprises a baffle means at the exit end of said assembly having a plurality of orifices, and a bimetallic member in operative relation to the baffle means such that at increased temperatures said bimetallic member deforms to unblock some of said orifices and allow increased coolant flow therethrough.

  15. Storage arrangement for nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Wade, E.E.

    1977-01-01

    Said invention is intended for providing an arrangement of spent fuel assembly storage inside which the space is efficiently used without accumulating a critical mass. The storage is provided for long fuel assemblies having along their longitudinal axis an active part containing the fuel and an inactive part empty of fuel. Said storage arrangement comprises a framework constituting some long-shaped cells designed so as each of them can receive a fuel assembly. Means of axial positioning of said assembly in a cell make it possible to support the fuel assemblies inside the framework according to a spacing ratio, along the cell axis, such as the active part of an assembly is adjacent to the inactive part of the adjacent assemblies [fr

  16. Transfer of Skills Evaluation for Assembly and Maintenance Training

    Directory of Open Access Journals (Sweden)

    Peveri Matteo

    2011-12-01

    Full Text Available One of the research topics within the EU-project SKILLS1 was the training of Industrial Maintenance and Assembly (IMA tasks. The IMA demonstrator developed comprehends two different training platforms, one based on technologies of Virtual Reality (VR and the other one on Augmented Reality (AR. To qualify the efficiency of the developed training systems different studies have been conducted, followed by a final “Transfer of Skill” evaluation that has been performed by service technicians at the “SIDEL industrial training centre” in Parma. This evaluation included qualitative methods (feedback collection in questionnaires as well as quantitative methods (experiments with control groups. The results demonstrate that both platforms are useful and suitable training tools for IMA tasks, and that the AR training decreased the number of unsolved errors in the task.

  17. Plutonium assemblies in reload 1 of the Dodewaard Reactor

    International Nuclear Information System (INIS)

    Bairiot, H.; Deramaix, P.; Vandenberg, C.; Leenders, L.; Mostert, P.

    1977-01-01

    Since 1963, Belgonucleaire has been developing the design of plutonium assemblies of the island type (i.e., plutonium rods inserted in the control zone of the assembly and enriched uranium rods at the periphery) for light water reactors. The application to boiling water reactors (BWRs) led to the introduction, in April 1971, of two prototype plutonium island assemblies in the Dodewaard BWR (The Netherlands): Those assemblies incorporating plutonium in 42 percent of the rods are interchangeable with standard uranium assemblies of the same reload. Their design, which had to meet these criteria, was performed using the routine order in use at Belgonucleaire; experimental checks included a mock-up configuration simulated in the VENUS critical facility at Mol and open-vessel cold critical experiments performed in the Dodewaard core. The pelleted plutonium rods were fabricated and controlled by Belgonucleaire following the manufacturing procedures developed at the production plant. In one of the assemblies, three vibrated plutonium fuel rods with a lower fuel density were introduced in the three most highly rated positions to reduce the power rating. Those plutonium assemblies experienced peak pellet ratings up to 535 W/cm and were discharged in April 1974 after having reached a mean burnup of approximately 21,000 MWd/MT. In-core instrumentation during operation, visual examinations, and reactivity substitution experiments during reactor shutdown did not indicate any special feature for those assemblies compared to the standard uranium assemblies, thereby demonstrating their interchangeability

  18. Device for transferring fast nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Plagnard, Andre.

    1982-01-01

    The description is given of a device for transferring fuel assemblies between a storage position near the reactor vessel and a position where the irradiated assemblies are evacuated and the provision of new assemblies for the reactor. This device can be dismantled and is movable as a whole for its successive use on several reactors and includes: - a platform mounted so as to rotate on a support made to rest on the structure of the reactor, the platform having at least one opening then being horizontal and mobile about a vertical axis to bring the opening successively in position with vertical wells giving access to the storage and evacuation positions of the assemblies provided in the reactor structure, - at least one hopper that can contain one assembly in a vertical position, located on the upper surface of the platform around the opening provided in it and fitted with a winch for the vertical moving of the assemblies inside the wells and the hopper, when these follow each other by rotation of the platform, - at least one connecting device carried on the platform for connecting the hopper and wells when these are in line [fr

  19. Fuel assembly for pressure loss variable PWR type reactor

    International Nuclear Information System (INIS)

    Yoshikuni, Masaaki.

    1993-01-01

    In a PWR type reactor, a pressure loss control plate is attached detachably to a securing screw holes on the lower surface of a lower nozzle to reduce a water channel cross section and increase a pressure loss. If a fuel assembly attached with the pressure loss control plate is disposed at a periphery of the reactor core where the power is low and heat removal causes no significant problem, a flowrate at the periphery of the reactor core is reduced. Since this flowrate is utilized for removal of heat from fuel assemblies of high powder at the center of the reactor core where a pressure loss control plate is not attached, a thermal limit margin of the whole reactor core is increased. Thus, a limit of power peaking can be moderated, to obtain a fuel loading pattern improved with neutron economy. (N.H.)

  20. Grid structure for nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Wachter, W.J.; Akey, J.G.

    1975-01-01

    Described is a nuclear fuel element support system comprising an egg-crate-type grid made up of slotted vertical portions interconnected at right angles to each other, the vertical portions being interconnected by means of cross straps which are dimpled midway between their ends to engage fuel elements disposed within openings formed in the egg-crate assembly. The cross straps are disposed at an angle, other than a right angle, to the vertical portions of the assembly whereby their lengths are increased for a given span, and the total elastic deflection capability of the cell is increased. The assembly is particularly adapted for computer design and automated machine tool fabrication

  1. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report [sr

  2. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1986-01-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  3. Maintenance experience on reactor recirculation pumps at Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Singh, A.K.

    1995-01-01

    Reactor recirculation pumps at Tarapur Atomic Power Station (TAPS) are vertical, single stage centrifugal pumps having mechanical shaft seals and are driven by vertical mounted 3.3 kV, 3 phase, 1500 h.p. electric motors. During these years of operation TAPS has gained enough experience and expertise on the maintenance of reactor recirculation pumps which are dealt in this article. Failure of mechanical shaft seals, damage on pump carbon bearings, motor winding insulation failures and motor shaft damage have been the main areas of concern on recirculation pump. A detailed procedure step by step with component sketches has helped in eliminating errors during shaft seal assembly and installation. Pressure breakdown devices in seal assembly were rebuilt. Additional coolant water injection for shaft seal cooling was provided. These measures have helped in extending the reactor recirculation pump seal life. Pump bearing problems were mainly due to failure of anti-rotation pins and dowel pins of bearing assembly. These pins were redesigned and strengthened. Motor stator winding insulation failures were detected. Stator winding replacement program has been taken up on regular basis to avoid winding insulation failure due to aging. 3 refs., 2 tabs., 7 figs

  4. Nuclear reactor, fuel assembly and neutron measuring system

    International Nuclear Information System (INIS)

    Chaki, Masao; Murase, Michio; Zukeran, Atsushi; Moriya, Kimiaki

    1998-01-01

    The present invention provides a BWR type reactor improved with the efficiency of used fuels and fuel economy by increasing a rated power and reducing exchange fuels. Namely, in a BWR type reactor at present, a thermal limit value is determined by conducting nuclear calculation of the reactor core based on data of reactor flow rate measurement and data of neutron flux measurement. However, since the neutron calculation of the reactor core is based on fuel assemblies while the points for the neutron measurement are present at the outside of the fuel assemblies, errors are caused. A margin including the errors has been used as a thermal limit value during operation. In the present invention, neutron fluxes in the fuel assembly as a base of the nuclear calculation can be measured by the same number of neutron detector tubes, but the number of the measuring points is increased to four times. With such procedures, errors caused by the difference of the neutron calculation and values at neutron measuring points can be reduced. As a result, a margin of the thermal limit value is reduced to increase the degree of freedom of reactor operation. Then, the economical property of the reactor operation can be improved. (N.H.)

  5. Reactor costs and maintenance, with reference to the Culham Mark II conceptual tokamak reactor design

    International Nuclear Information System (INIS)

    Hancox, R.; Mitchell, J.T.D.

    1977-01-01

    Published designs of tokamak reactors have proposed conceptual solutions for most of the technological problems encountered. Two areas which remain uncertain, however, are the capital cost of the reactor and the practicability of reactor maintenance. A cost estimate for the Culham Conceptual Tokamak Reactor (Mk I) is presented. The capital cost of a power station incorporating this reactor would be significantly higher than that of an equivalent fast breeder fission power station, mainly because of the low power density of the fusion reactor which affects both the reactor and building costs. To reduce the fusion station capital costs a new conceptual design is proposed (Mk II) which incorporates a shaped plasma cross-section to give a higher plasma pressure ratio, βsub(t) approximately 0.1. Since the higher power density implies more severe radiation damage of the blanket structure, the question of reactor maintenance assumes greater importance. With the proposed scheme for regular replacement of the blanket, a fusion power station availability around 0.9 should be achievable. (author)

  6. Reactor costs and maintenance, with reference to the Culham Mark II conceptual Tokamak reactor design

    International Nuclear Information System (INIS)

    Hancox, R.; Mitchell, J.T.D.

    1976-01-01

    Published designs of tokamak reactors have proposed conceptual solutions for most of the technological problems encountered. Two areas which remain uncertain, however, are capital cost of the reactor and the practicability of reactor maintenance. A cost estimate for the Culham Conceptual Tokamak Reactor (Mk I) is presented. The capital cost of a power station incorporating this reactor would be significantly higher than that of an equivalent fast breeder fission power station, due mainly to the low power density of the fusion reactor which affects both the reactor and building costs. In order to reduce the fusion station capital costs a new conceptual design is proposed (Mk II) which incorporates a shaped plasma cross-section to give a higher plasma pressure ratio, βsub(t) approximately 0.1. Since the higher power density implies more severe radiation damage of the blanket structure, the question of reactor maintenance assumes greater importance. With the proposed scheme for regular replacement of the blanket, a fusion power station availability around 0.9 should be achievable. (orig.) [de

  7. Laser-Based Maintenance and Repair Technologies for Reactor Components

    International Nuclear Information System (INIS)

    Masaki Yoda; Naruhiko Mukai; Makoto Ochiai; Masataka Tamura; Satoshi Okada; Katsuhiko Sato; Motohiko Kimura; Yuji Sano; Noboru Saito; Seishi Shima; Tetsuo Yamamoto

    2004-01-01

    Toshiba has developed various laser-based maintenance and repair technologies and applied them to existing nuclear power plants. Laser-based technology is considered to be the best tool for remote processing in nuclear power plants, and particularly so for the maintenance and repair of reactor core components. Accessibility could be drastically improved by a simple handling system owing to the absence of reactive force against laser irradiation and the flexible optical fiber. For the preventive maintenance, laser peening (LP) technology was developed and applied to reactor components in operating BWR plants. LP is a novel process to improve residual stress from tensile to compressive on material surface layer by irradiating focused high-power laser pulses in water. We have developed a fiber-delivered LP system as a preventive maintenance measure against stress corrosion cracking (SCC). Laser ultrasonic testing (LUT) has a great potential to be applied to the remote inspection of reactor components. Laser-induced surface acoustic wave (SAW) inspection system was developed using a compact probe with a multi-mode optical fiber and an interferometer. The developed system successfully detected a micro slit of 0.5 mm depth on weld metal and heat-affected zone (HAZ). An artificial SCC was also detected by the system. We are developing a new LP system combined with LUT to treat the inner surface of bottom-mounted instruments (BMI) of PWR plants. Underwater laser seal welding (LSW) technology was also developed to apply surface crack. LSW is expected to isolate the crack tip from corrosive water environment and to stop the propagation of the crack. Rapid heating and cooling of the process minimize the heat effect, which extends the applicability to neutron-irradiated material. This paper describes recent advances in the development and application of such laser-based technologies. (authors)

  8. Absorbing rods for nuclear fast neutron reactor absorbing assembly

    International Nuclear Information System (INIS)

    Aji, M.; Ballagny, A.; Haze, R.

    1986-01-01

    The invention proposes a neutron absorber rod for neutron absorber assembly of a fast neutron reactor. The assembly comprises a bundle of vertical rods, each one comprising a stack of pellets made of a neutron absorber material contained in a long metallic casing with a certain radial play with regard to this casing; this casing includes traps for splinters from the pellets which may appear during reactor operation, at the level of contact between adjacent pellets. The present invention prevents the casing from rupture involved by the disintegration of the pellets producing pieces of boron carbide of high hardness [fr

  9. Maintenance system for immersed seals, specifically for nuclear reactors

    International Nuclear Information System (INIS)

    Poindexter, A.M.; Ricks, H.E.

    1977-01-01

    The invention concerns the immersed seals of nuclear reactors and specifically a maintenance system for the immersed seals of the revolving closing plugs of liquid metal breeder nuclear reactors. A liquid sodium immersed joint may be located at a given place or be surrounded by heating elements so that the sodium stays liquid whilst the reactor is working. In other cases, the sodium in the immersed seal is allowed to solidify whilst the reactor is working, thereby increasing the efficiency of the seal. At all events, the sodium must be in a liquid state during reloading with fuel to enable the plug to turn. The invention consists in fitting an ultrasonic transducer to the closure head of the reactor vessel so that the vibration emitting surface directs these vibrations towards the immersed seals so as to detach the deposits of impurities on them and ensure the wetting of the metal surfaces of which they are formed. Additionally, an envelope that can be placed around the ultrasonic transducer in conjunction with a suction appliance provides a mechanism through which the impurities can be removed from the area of the immersed seal [fr

  10. Fuel assembly for a nuclear reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ferrari, H M; Miller, D L; Tong, L S

    1973-09-06

    The subject of the patent is a spacer design applicable, primarily, to LWR, and especially, though not specifically PWR, fuel assemblies. The spacer consists of an egg-box type of assembly formed of interlocking pressed plates giving a square lattice whose openings accommodate fuel pins or regulating rods. The pressed plates are formed to provide pressed-out spring-like flanges which hold the fuel pins in position and guide the regulating rods. Additional pressed-out flanges ensure the correct configuration of the spacer structure. The spacer is designed to present as little resistance as possible to coolant flow.

  11. Simulation model of dynamical behaviour of reactor fuel assemblies

    International Nuclear Information System (INIS)

    Planchard, J.

    1994-01-01

    This report briefly describes the homogenized dynamical equations of a tube bundle placed in a perfect irrotational fluid, on case of small displacements. This approach can be used to study the mechanical behaviour of fuel assemblies of PWR reactor submitted to earthquake or depressurization blow-down. The numerical calculations require to define the added mass matrix of the fuel assemblies, for which the principle of computation is presented. (author). 14 refs., 4 figs

  12. Fuel assemblies for FBR type reactor

    International Nuclear Information System (INIS)

    Ikeda, Kiyoshi.

    1981-01-01

    Purpose: To decrease errors in the flow rate distribution of coolants by resiliently inserting a flow regulation rod having a variable flow regulation element formed at the upper portion along the axial direction in the entrance nozzle of a fuel assembly. Constitution: A plurality of orifice aperture are formed to the entrance nozzle of a fuel assembly and an aperture for inserting a flow regulation rod is formed to the top end of the entrance nozzle. A fixed flow regulation element A and a variable flow regulation element B supported coaxially with the nozzle by a support ring are disposed to the inside of the nozzle. The element B is urged by the resilient urging spring to the element A and connected by way of support lever to the flow regulation rod. While on the other hand, the top end of the nozzle is inserted through the partition wall between a high pressure coolant chamber and a low pressure coolant chamber. An aperture for hydrodynamically supporting the fuel assembly is provided by way of a frame and a flow regulation rod that stands vertically from the low pressure coolant chamber is disposed to the center of the frame. In the fuel assembly, the flow regulation rod inserted from the aperture at the top end of the nozzle pushes the element B upwardly to thereby maintain a flow passage of the coolant between the elements A and B. (Seki, T.)

  13. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1988-01-01

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  14. Examples of in-service inspections and typical maintenance schedule for low-power research reactors

    International Nuclear Information System (INIS)

    Boeck, H.

    1997-01-01

    In-service inspection methods for low-power research reactors are described which have been developed during the past 37 years of the operation of the TRIGA reactor Vienna. Special tools have been developed during this period and their application for maintenance and in-serve inspection is discussed. Two practical in-service inspections at a TRIGA reactor and at a MTR reactor are presented. Further a typical maintenance plan for a TRIGA reactor is listed in the annex. (author)

  15. Maintenance of ageing CANDU reactors. A regulatory perspective

    International Nuclear Information System (INIS)

    Dunstan, T.

    1996-01-01

    The subject of this paper is, 'requirements for maintenance of ageing reactors from the perspective of a regulator', with a focus on the particular theme of; 'continuing safety assurance'. A major role of maintenance is to ensure the continuing reliability and effectiveness of safety related systems and equipment. Continuing safety assurance is an issue the Atomic Energy Control Board has been wrestling with for some time. From my perspective, much remains to be done before the AECB can be confident that Canadian nuclear plants have the necessary programs in place to achieve continuing safety assurance. To introduce the topic, it would be appropriate to say a few words about the AECB's position with respect to the situation at the Pickering NGS. Why did we blow the whistle last August and, what are we doing about it? (author)

  16. Mechanics of structures and maintenance of pressurized water reactors

    International Nuclear Information System (INIS)

    Hutin, J.P.

    1992-01-01

    Electricite de France nowadays has in operation 34 units of 900 MW and 17 units of 1300 MW of PWR. Since the first unit was run, this means that more than 350 reactor-years have been performed, to which should be added the experience already gained on fossil fuel or natural uranium plants. This enabled EDF to build its own philosophy and a strategy for maintenance that are best suited for the specific requirements of the hardware with which the actual nuclear boilers are made-up. This philosophy and strategy rest upon an analysis which calls widely for the mechanics of structures, to such an extent that major decisions concerning maintenance depend on the ability that one has for resolving problems within the scope of that discipline

  17. Operation and maintenance of the RB reactor, Annual report for 1977

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1977-01-01

    The annual report for 1977 includes the following: utilization of the RB reactor; new regulations and instructions for reactor operation; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Five annexes are concerned with: testing the properties of preamplifiers for linear and logarithmic experimental channels; properties of the neutron converter; maintenance of the reactor equipment; purchase of new equipment; and the program for training reactor operators

  18. Television alignment of mast assembly in refueling of nuclear reactor

    International Nuclear Information System (INIS)

    Kaufmann, J.W.; Swidwa, K.J.; Hornak, L.P.

    1990-01-01

    This patent describes the refueling of a nuclear reactor having component assemblies of at least one type and being disposed in a pit in a containment under water, the refueling being carried out with a mast movable axially and circumferentially for raising and lowering the component assemblies, a mechanism, connected to an end of the mast, cooperative with the mast, for engaging a component assembly to be raised by the mast, a television camera, and a television monitor having an image-reference indication, the mechanism being connected to the mast movable with the mast; the method of positioning the mechanism to engage the component assembly appropriately for raising and lowering. It comprises: mounting the camera on the mechanism movable therewith, suspending the mast in the water of the pit with the mechanism extending from the end of the mast in the pit in position to engage the component assembly

  19. About fuel assemblies optimization in research reactor

    International Nuclear Information System (INIS)

    Malers, Yu.P.

    1992-01-01

    Ealier was considered an algorithm for optimization of fuel assembly arrangement in a research reator. The alggorithm was based on an analytical relation between distributions of energy release and fuel concentration and on the method of succesive linearization and partially integral-number programming. In the paper are solved the problems, appeared as a result of realization of the used approach and required more correct formulation of the algorithm and introduction in it some variations

  20. Operation and maintenance experience at the TRIGA Mainz reactor

    International Nuclear Information System (INIS)

    Menke, Helmut

    1976-01-01

    Oscillations observed in the linear power channel especially at low steady state power with the pulse-rod in down position were found to be due to wear of connections of the pulse-rod. The downstream water from the cooling system caused a swing of the rod, which in turn induced the power oscillations. The wear can be regarded as normal, as more than 10,000 pulses have been performed so far. The repairs of the rod assembly are described. No major problems in operation and maintenance of the TRIGA Mainz were met since 1974. Results of routine inspections as fuel element measurements, power calibrations, etc., are described and discussed. (author)

  1. Maintenance quality surveillance for nuclear reactor instrument and control systems

    International Nuclear Information System (INIS)

    Clement, T.M.

    1976-01-01

    A description is given of a formal program of mandatory testing and inspection for assurance of reliability at the N-reactor. The techniques and procedures are called Equipment Maintenance Standards (EMS) and cover the nuclear plant systems which affect nuclear safety, environmental control, continuity of operation and reactor life. The scope of the program is such that all electrical, chemical, mechanical, and nuclear devices with interconnecting circuitry, linkages, and piping are functionally checked and/or inspected from sensors through actuating media necessary for carrying out the defined functions under startup, operating, and shutdown conditions and also under any credible accident condition. Records are kept of the AS FOUND results of the tests and inspections along with adjustments and repairs required to correct any out-of-limits conditions found. These records are accumulated and are used as a source for quantitative reliability information and for evaluating wear-out or design problems

  2. Preventive maintenance program for a research and production reactor

    International Nuclear Information System (INIS)

    Rico, N.A.

    1990-01-01

    This program proposes a simple, rapid and efficient methodology for the task of developing a really preventive maintenance discipline. Moreover, the lower cost of its application -since it must satisfy the plant's budget-. To this purpose, an extremely economical and easily obtainable infrastructure is proposed. The following stage is referred to the commissioning system, subsequent supervision and follow-up. The experience gained from the two reactors as RA-6 (Bariloche Atomic Center) and NUR (RAE) of Argelia. Finally, the interacting characteristic of this program, since it may be rapidly adapted to different dimensions of plants, laboratories, etc., must be pointed out. (Author) [es

  3. Reactor cell assembly for use in spectroscopy and microscopy applications

    Science.gov (United States)

    Grindstaff, Quirinus; Stowe, Ashley Clinton; Smyrl, Norm; Powell, Louis; McLane, Sam

    2015-08-04

    The present disclosure provides a reactor cell assembly that utilizes a novel design and that is wholly or partially manufactured from Aluminum, such that reactions involving Hydrogen, for example, including solid-gas reactions and thermal decomposition reactions, are not affected by any degree of Hydrogen outgassing. This reactor cell assembly can be utilized in a wide range of optical and laser spectroscopy applications, as well as optical microscopy applications, including high-temperature and high-pressure applications. The result is that the elucidation of the role of Hydrogen in the reactions studied can be achieved. Various window assemblies can be utilized, such that high temperatures and high pressures can be accommodated and the signals obtained can be optimized.

  4. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Milosevic, M.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.

    1981-12-01

    The RA nuclear reactor stopped operation after March 1979 campaign due to appearance of aluminium oxyhydrates deposits on the surface of fuel element claddings. Relevant decisions of the Sanitary inspection body of the Ministry of health and the Director General of the 'Boris Kidric' Institute of nuclear sciences, Vinca, banned further reactor operation until reasons caused aluminium oxyhydrates deposition are investigated and removed to enable regular reactor operation. Until the end of 1979 and during 1980, after a series of analyses and findings that caused cease of reactor operation, all the preparatory actions needed for restart were performed. Due to the fact that there is no emergency cooling system and no appropriate filtering system at the reactor, and according to the new regulations about start up of nuclear facilities, the Sanitary inspection body made a decision about temporary licence for reactor start-up meaning performance of the 'zero experiment' limiting the operating power to 1% of the nominal power. Accordingly the reactor was restarted on January 21 1981. Criticality was reached with the core made of 80% enriched fuel elements only. After the experiment was finished by the end of March a permission was demanded for operation at higher power levels at full power. Taking into account the state of the reactor components the operating licence was issued limiting the power to 2 MW until reconstruction of the ventilation system and construction of the emergency cooling system are fulfilled. Program of testing operation started on September 15 1981 increasing gradually the operating power. Thus the reactor was operated at 2 MW power for 15 days during November and December. The total production achieved in 1981 was 1698 MWh. This enabled isotopes production at the reactor during last two months. Control and maintenance of the reactor components and systems was done regularly and efficiently within limits imposed by availability of spare parts. The

  5. Nuclear reactor fuel assembly spacer grid

    International Nuclear Information System (INIS)

    Jabsen, F.S.

    1977-01-01

    A spacer grid for a nuclear fuel assembly is comprised of a lattice of grid plates forming multiple cells that are penetrated by fuel elements. Resilient protrusions and rigid protrusions projecting into the cells from the plates bear against the fuel element to effect proper support and spacing. Pairs of intersecting grid plates, disposed in a longitudinally spaced relationship, cooperate with other plates to form a lattice wherein each cell contains adjacent panels having resilient protrusions arranged opposite adjacent panels having rigid protrusions. The peripheral band bounding the lattice is provided solely with rigid protrusions projecting into the peripheral cells. (Auth.)

  6. Operation and maintenance of the RB reactor, Annual report for 1980

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.; Markovic, H.; Zivkovic, B.; Gogdanovic, M.; Petronijevic, M.

    1980-12-01

    This report includes data concerned with reactor operation and utilization, status of reactor components and equipment, refurbishment of the equipment, dosimetry and radiation protection, reactor staff, financing. It includes 9 Annexes as follows: Utilization of the RB reactor from 1976 - 1980; program of reactor utilization from 1981-1985; contents of the RB reactor safety report; maintenance of the reactor components and equipment in 1980; verification of reactor reliability after the earthquake (May 18 1980); refurbishment of equipment in 1980, and purchasing new equipment from 1981-1985; review of radiation doses in the reactor building and exposure doses for the reactor staff; personnel data and financial data

  7. Single-piece maintenance procedures for the TITAN reversed-field pinch reactor

    International Nuclear Information System (INIS)

    Grotz, S.P.; Creedon, R.L.; Cooke, P.I.H.; Duggan, W.P.; Krakowski, R.A.; Najmabadi, F.; Wong, C.P.C.

    1987-01-01

    The TITAN reactor is a compact (major radius of 3.9 m and minor plasma radius of 0.6 m), high neutron wall loading (--18MW/m 2 ) fusion energy system based on the reversed-field pinch (RFP) concept. The TITAN-I fusion power core (FPC) is a lithium, self-cooled design with vanadium alloy (V-3Ti-1Si) structural material. The compact design of the TITAN fusion power core (FPC) reduces the system to a few small and relatively low mass components, making toroidal segmentation of the FPC unnecessary. A single-piece maintenance procedure in which the replaceable first wall and blanket is removed as a single unit is, therefore, possible. The TITAN FPC design provides for top access to the reactor with vertical lifts used to remove the components. The number of remote handling procedures is few and the movements are uncomplicated. The annual torus replacement requires that the reusable ohmic-heating coil set and hot-shield assembly be removed and temporarily stored in a hot cell. The used first wall and blanket assembly is drained and disconnected from the coolant supply system, then lifted to a processing room where it is cooled and prepared for Class-C waste burial. The new, pre-tested first wall and blanket assembly is then lowered into position and the removal procedure is reversed to complete the replacement process

  8. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities

  9. Guide tube insert assembly for use in a nuclear reactor

    International Nuclear Information System (INIS)

    Hopkins, R.J.; Land, J.T.

    1992-01-01

    This patent describes an internals assembly for a nuclear reactor of the type including an upper support plate and an upper core plate, each having apertures for conducting control rod assemblies into an out of fuel assemblies with the apertures of the upper support plate being aligned with the apertures of the upper core plate, a guide tube insert assembly comprising: an elongated tubular body extending between at least one of the aligned apertures formed in the upper support plate and the upper core plate; guide plates within the elongated tubular body, each of the guide plates having a planar surface extending substantially perpendicular to an axial direction of the tubular body; at least one interconnecting means for interconnecting the guide plates into a guide tube insert assembly such that the guide plates are simultaneously mountable within and removable from the elongated body, and the periphery of each of the guide plates is spaced apart from the inner walls of the elongated tubular body at every point when the insert assembly is mounted within the tubular body, and a stabilizing means for securing the lowermost guide plate of the guide tube insert assembly within the elongated tubular body to prevent rotational and lateral movement between the guide tube insert assembly and the tubular body

  10. Design Procedure on Stud Bolt for Reactor Vessel Assembly

    International Nuclear Information System (INIS)

    Kim, Jong-Wook; Lee, Gyu-Mahn; Jeoung, Kyeong-Hoon; Kim, Tae-Wan; Park, Keun-Bae; Kim, Keung-Koo

    2008-10-01

    The reactor pressure vessel flange is welded to the upper part of reactor pressure vessel, and there are stud holes to mount the closure head with stud bolts. The surface mating the closure head is compressed with O-ring, which acts as a sealing gasket to prevent coolant leakage. Bolted flange connections perform a very important structural role in the design of a reactor pressure vessel. Their importance stems from two important functions: (a) maintenance of the structural integrity of the connection itself, and (b) prevention of leakage through the O-ring preloaded by stud bolts. In the present study, an evaluation procedure for the design of stud bolt is developed to meet ASME code requirements. The developed design procedure could provide typical references in the development of advanced reactor design in the future

  11. Fuel assembly for a nuclear reactor

    International Nuclear Information System (INIS)

    Ferrari, H.M.; Miller, D.L.; Tong, L.S.

    1975-01-01

    A description is given of a fuel assembly including multiple open channel grids for holding fuel rods and control rod guide thimbles in predetermined fixed relationship with each other. Metallic straps are interwoven to form a grid or egg crate configuration having openings which receive the fuel rods and guide thimbles. To properly support and cool the fuel rods near the grid-fuel rod interface, springs and dimples on the grid straps project into each opening, the dimples being oriented in a direction to permit flow of coolant upwardly therethrough. To minimize turbulence in coolant flow, the leading edge of each grid strap is provided with cutout sections which form scallops effective in channeling coolant in a uniform flow path through the network of grid openings

  12. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report

    International Nuclear Information System (INIS)

    1985-01-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training

  13. Design of the TFTR [Tokamak Fusion Test Reactor] maintenance manipulator

    International Nuclear Information System (INIS)

    Loesser, G. D.; Heitzenroeder, P.; Bohme, G.; Selig, M.

    1987-01-01

    The Tokamak Fusion Test Reactor (TFTR) plans to generate a total of 3 x 10 21 neutrons during its deuterium-tritium run period in 1900. This will result in high levels of radiation, especially within the TFTR vacuum vessel. The maintenance manipulator's mission is to assist TFTR in meeting Princeton Plasma Physics Laboratory's personnel radiation exposure criteria and in maintaining as-low-as-reasonably-achievable principals by limiting the radiation exposure received by operating and maintenance personnel. The manipulator, which is currently being fabricated and tested by Kernforschungszentrum Karlsruhe, is designed to perform limited, but routine and necessary, functions within the TFTR vacuum torus after activation levels within the torus preclude such functions being performed by personnel. These functions include visual inspection, tile replacement, housekeeping tasks, diagnostic calibrations, and leak detection. To meet its functional objectives, the TFTR maintenance manipulator is required to be operable in TFTR's very high vacuum environment (typically 2 x 10 -8 Torr). It must also be bakeable at 150 degree C and able to withstand the radiation environment

  14. A partial grid for a nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Demario, E.E.

    1985-01-01

    The invention relates to a nuclear-reactor fuel assembly including fuel-rod supporting transverse grids. The fuel assembly includes at least one additional transverse grid which is disposed between two fuel-rod supporting grids and consists of at least one partial grid structure extending across only a portion of the fuel assembly and having fuel rods and control-rod guide thimbles of only said portion extending therethrough. The partial grid structure includes means for providing lateral support of the fuel rods and/or means for laterally deflecting coolant flow, and it is formed of inter-leaved inner straps and border straps, the interleaved inner straps preferably being of substantially smaller height than the border straps to reduce the amount of material capable of parasitically absorbing neutrons. The additional transverse grid may comprise several partial grid structures associated with different groups of fuel rods of the fuel assembly

  15. Compactable control element assembly for a nuclear reactor

    International Nuclear Information System (INIS)

    Dupen, C.F.G.

    1976-01-01

    A description is given of a compactable control element assembly for a nuclear reactor in which the absorber pins of the assembly are compacted during downward movement of the pin and are returned to their uncompacted state when downward movement is stopped. The control element assembly comprises a support member longitudinally movable within a control assembly duct and a plurality of absorber pins supported laterally outward of the support member and within the duct by pairs of support arms. The absorber pins are pivotably mounted to the support arms and the support arms in turn are supported from the support member for upward pivotable movement in a longitudinal plane. As the support member is moved downward, the support arms pivot upwardly and the absorber pins move upwardly and inwardly towards the support member. When the support member is stopped the absorber pins return to their uncompacted position

  16. Fission rate measurements in fuel plate type assembly reactor cores

    International Nuclear Information System (INIS)

    Rogers, J.W.

    1988-01-01

    The methods, materials and equipment have been developed to allow extensive and precise measurement of fission rate distributions in water moderated, U-Al fuel plate assembly type reactor cores. Fission rate monitors are accurately positioned in the reactor core, the reactor is operated at a low power for a short time, the fission rate monitors are counted with detectors incorporating automated sample changers and the measurements are converted to fission rate distributions. These measured fission rate distributions have been successfully used as baseline information related to the operation of test and experimental reactors with respect to fission power and distribution, fuel loading and fission experiments for approximately twenty years at the Idaho National Engineering Laboratory (INEL). 7 refs., 8 figs

  17. Safe operation of critical assemblies and research reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-09-15

    Some countries have accumulated considerable experience in the operation of these reactors and have in the process developed safe practices. On the other hand, other countries which have recently acquired, or will soon acquire, such reactors do not have sufficient background of experience with them to have developed full knowledge regarding their safe operation. In this situation, the International Atomic Energy Agency has considered that it would be useful to make available to all its Member States a set of recommendations on the safe operation of these reactors, based on the accumulated experience and best practices. The Director General accordingly nominated a Pane Ion Safe Operation of Critical Assemblies and Research Reactors to assist the Agency's Secretariat in drafting such recommendations

  18. Automated pose estimation of objects using multiple ID devices for handling and maintenance task in nuclear fusion reactor

    International Nuclear Information System (INIS)

    Umetani, Tomohiro; Morioka, Jun-ichi; Tamura, Yuichi; Inoue, Kenji; Arai, Tatsuo; Mae, Yasusi

    2011-01-01

    This paper describes a method for the automated estimation of three-dimensional pose (position and orientation) of objects by autonomous robots, using multiple identification (ID) devices. Our goal is to estimate the object pose for assembly or maintenance tasks in a real nuclear fusion reactor system, with autonomous robots cooperating in a virtual assembly system. The method estimates the three-dimensional pose for autonomous robots. This paper discusses a method of motion generation for ID acquisition using the sensory data acquired by the measurement system attached to the robots and from the environment. Experimental results show the feasibility of the proposed method. (author)

  19. Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair

    International Nuclear Information System (INIS)

    1983-01-01

    This is the initial issue of the guidebook. Since a guidebook of this type must incorporate information concerning a wide range of subjects, much additional data will eventually be included. The guidebook will document, in summary and easily referenceable form, data, designs, design concepts, design guidelines and background information useful to the FWBS and to the Maintenance System designer. In providing guidelines for the AMR of the FWBS, the guidebook must, of necessity, include guidelines for all aspects of maintenance associated with the FWBS. These include most maintenance operations within the reactor room necessary to gain access, identify faults, and handle equipment related to FWBS maintenance. In addition, the guidelines include those required to define facility requirements for handling and repair of FWBS and related reactor components external to the reactor room. Particular emphasis is given to remote maintenance design and operations

  20. Designer's guidebook for first wall/blanket/shield assembly, maintenance, and repair

    Energy Technology Data Exchange (ETDEWEB)

    1983-12-30

    This is the initial issue of the guidebook. Since a guidebook of this type must incorporate information concerning a wide range of subjects, much additional data will eventually be included. The guidebook will document, in summary and easily referenceable form, data, designs, design concepts, design guidelines and background information useful to the FWBS and to the Maintenance System designer. In providing guidelines for the AMR of the FWBS, the guidebook must, of necessity, include guidelines for all aspects of maintenance associated with the FWBS. These include most maintenance operations within the reactor room necessary to gain access, identify faults, and handle equipment related to FWBS maintenance. In addition, the guidelines include those required to define facility requirements for handling and repair of FWBS and related reactor components external to the reactor room. Particular emphasis is given to remote maintenance design and operations.

  1. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1984-12-01

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization

  2. RA research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1985

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1985-01-01

    According to the plan, RA reactor was to be in operation in mid September 1985. But, since the building of the emergency cooling system, nor the reconstruction of the existing special ventilation system were not finished until the end of August reactor was not operated during 1985. During the previous four years reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care, which was cancelled in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981-1984. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks have started: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. IAEA has approved the amount of 1,300,000 US dollars for the renewal of the instrumentation [sr

  3. Reactor fuel element and fuel assembly

    International Nuclear Information System (INIS)

    Okada, Seiji; Ishida, Tsuyoshi; Ikeda, Atsuko.

    1997-01-01

    A mixture of fission products and burnable poisons is disposed at least to a portion between MOX pellets to form a burnable poison-incorporated fuel element without mixing burnable poisons to the MOX pellets. Alternatively, a mixture of materials other than the fission products and burnable poisons is formed into disks, a fuel lamination portion is divided into at least to two regions, and the ratio of number of the disks of the mixture relative to the volume of the region is increased toward the lower portion of the fuel lamination portion. With such a constitution, the axial power distribution of fuels can be made flat easily. Alternatively, the thickness of the disk of the mixture is increased toward the lower region of the fuel lamination portion to flatten the axial power distribution of the fuels in the same manner easily. The time and the cost required for the manufacture are reduced, and MOX fuels filled with burnable poisons with easy maintenance and control can be realized. (N.H.)

  4. Fuel assembly for BWR type reactor

    International Nuclear Information System (INIS)

    Ueda, Makoto

    1990-01-01

    Various considerations are applied to fuel rods for improving the fuel burnup degree. If a gap between the fuel rods is changed, this varies the easiness for the flow of coolants depending on places, to reduce the thermal margin. Then, it is noted for the distribution of stresses generated due to the difference of water pressure caused by the difference of water streams between the inside and the outside of a channel box, and composite value, of stresses upon occurrence of earthquakes, neutron irradiation and a channel creep phenomenon caused by the stresses of due to the water pressure difference described above, the thickness of the channel box is increased in the upstream and decreased toward the downstream. Further, fuel spacers at the position where the thickness of the channel box is changed are spaced apart from the channel box so as not to brought into contact with the channel box. This can contribute to the reduction of coolants pressure loss, improvement of critical power and improvement of reactivity, as well as remarkably moderate local stresses applied from the fuel spacers to the channel box due to horizontal vibrations upon occurrence of earthquakes to improve the integrity of fuel assembly. (N.H.)

  5. Fissile fuel assembly for a sub-moderated nuclear reactor

    International Nuclear Information System (INIS)

    Millot, J.P.; Dejeux, Pol.; Alibran, Patrice.

    1983-01-01

    Each of the core assemblies is composed of a prismatic case made of a neutron absorbing material, inside which very long rods containing the fissile material are arranged parallel to the height of the case and according to a regular network in the straight sections of the case. At least one piece in a fertile material exposed to the neutrons emitted by the fissile material of the assembly is arranged on each one of the side faces of the case. The invention applies in particular to sub-moderated reactors, cooled and moderated by pressurized water [fr

  6. Spacer grid for a nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Jabsen, F.S.

    1978-01-01

    The spacer grid consists of pairs of plates forming rectangular cells and enclosing the cylindrical fuel assemblies. They have got rigid as well as elastic projections extending into the cells and holding the fuel assemblies. Additional pairs of plates are arranged in about the center of the grid of plates. They have got only elastic projections extending on both sides of the plates into one cell each. This spacer grid may be used for reactor cores with and without fuel channels. By the combination of spring-elastic and rigid projections there is obtained a reinforced outer tie. Hydraulic pressure losses, parasitic neutron capture, and hot spots are essentially reduced. (DG) [de

  7. Hydraulic shock damper for fuel assemblies of nuclear reactors

    International Nuclear Information System (INIS)

    Jabson, F.S.

    1978-01-01

    A typical embodiment of this invention provides a hydraulic mechanism for alleviating the effect of seismic forces and other stresses that are applied to a fuel assembly in a nuclear reactor. Illustratively, hollow guide posts potrude into a fuel assembly end fitting grid from biased spring pads. Plungers that move with the spring pads plug one end of each of the respective guide posts. Plates on the end fitting grid that have individual holes for fluid discharge partially plug the other ends of the respective guide posts, thereby providing a hydraulic means for absorbing the longitudinal component of seismic shocks and other anticipated forces. (Auth.)

  8. Light water reactors fuel assembly mechanical design and evaluation

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This standard establishes a procedure for performing an evaluation of the mechanical design of fuel assemblies for light water-cooled commercial power reactors. It does not address the various aspects of neutronic or thermalhydraulic performance except where these factors impose loads or constraints on the mechanical design of the fuel assemblies. This standard also includes a set of specific requirements for design, various potential performance problems and criteria aimed specifically at averting them. This standard replaces ANSI/ANS-57.5-1978

  9. Remote maintenance in TOR fast reactor fuel reprocessing facility

    International Nuclear Information System (INIS)

    Eymery, R.; Constant, M.; Malterre, G.

    1986-11-01

    The TOR facility which is undergoing commissioning tests has a capacity of 5 T. HM/year which is enough for reprocessing all the Phenix fuel, with an excess capacity which is to be used for other fast reactors fuels. It is the result of enlargement and renovation of the old Marcoule pilot facility. A good load factor is expected through the use of equipment with increased reliability and easy maintenance. TOR will also be used to test new equipment developed for the large breeder fuel reprocessing plant presently in the design stage. The latter objective is specifically important for the parts of the plant involving mechanical equipment which are located in a new building: TOR 1. High reliability and flexibility will be obtained in this building thanks to the attention given to the integrated remote handling system [fr

  10. Drum of storing fuel assemblies of nuclear reactor

    International Nuclear Information System (INIS)

    Artemiev, L.N.; Batjukov, V.I.; Fadeev, A.I.

    1979-01-01

    The proposed drum for storing fuel assemblies of a nuclear reactor comprises a holder rotatable around its axis and provided with tubular sockets arranged in concentric rows along the circumference of the holder so that the axis of at least one socket of each row intersects the trajectory described by the grip of the recharging mechanism in the course of its movement. The proposed drum design makes it possible to facilitate and speed up the process of recharging fuel asemblies

  11. Vibration analysis of reactor assembly internals for Prototype Fast Breeder Reactor

    International Nuclear Information System (INIS)

    Chellapandi, P.; Jalaldeen, S.; Srinivasan, R.; Chetal, S.C.; Bhoje, S.B.

    2003-01-01

    Vibration analysis of the reactor assembly components of 500 MWe Prototype Fast Breeder Reactor (PFBR) is presented. The vibration response of primary pump as well as dynamic forces developed at its supports are predicted numerically. The stiffness properties of hydrostatic bearing are determined by formulating and solving governing fluid and structural mechanics equations. The dynamic forces exerted by pump are used as input data for the dynamic response of reactor assembly components, mainly inner vessel, thermal baffle and control plug. Dynamic response of reactor assembly components is also predicted for the pressure fluctuations caused by sodium free level oscillations. Thermal baffle (weir shell) which is subjected to fluid forces developed at the associated sodium free levels is analysed by formulating and solving a set of non-linear equations for fluids, structures and fluid structure interaction (FSI). The control rod drive mechanism is analysed for response under flow induced forces on the parts subjected to cross flow in the zone just above the core top, taking into account FSI between sheaths of control and safety rod and absorber pin bundle. Based on the analysis results, it is concluded that the reactor assembly internals are free from any risk of mechanical as well as flow induced vibrations. (author)

  12. Maintenance procedures for the TITAN-I and TITAN-II reversed field pinch reactors

    International Nuclear Information System (INIS)

    Grotz, S.P.; Duggan, W.; Krakowski, R.; Najmabadi, F.; Wong, C.P.C.

    1989-01-01

    The TITAN reactor is a compact, high-power-density (neutron wall loading 18 MW/m 2 ) machine, based on the reversed-field-pinch (RFP) confinement concept. Two designs for the fusion power core have been examined: TITAN-I is based on a self-cooled lithium loop with a vanadium-alloy structure for the first wall, blanket and shield; and TITAN-II is based on an aqueous loop-in-pool design with a LiNO 3 solution as the coolant and breeder. The compact design of the TITAN fusion power core, (FPC) reduces the system to a few small and relatively low mass components, making toroidal segmentation of the FPC unnecessary. A single-piece maintenance procedure is possible. The potential advantages of single-piece maintenance procedures are: (1) Short period of down time; (2) improved reliability; (3) no adverse effects resulting from unequal levels of irradiation; and (4) ability to continually modify the FPC design. Increased availability can be expected from a fully pre-tested, single-piece FPC. Pre-testing of the FPC throughout the assembly process and prior to installation into the reactor vault is discussed. (orig.)

  13. Development of design system of manipulator for fusion reactor maintenance

    International Nuclear Information System (INIS)

    Ida, Toshio; Niikura, Setsuo; Ishiguro, Akiko; Yamada, Masao; Matsuoka, Fushiki

    1989-01-01

    A program which supports designers of a manipulator for in-vessel maintenance of a fusion reactor has been developed. The main purpose of this program is to provide the designer with a promising manipulator specification by furnishing useful information. It combines a technique of knowledge engineering with numerical solutions. This program consists of three parts: The first part is to generate candidates for the manipulator using a knowledge base; the second is to evaluate both static and dynamic properties of each candidate through numerical simulation of the maintenance task; and the third is to select the candidates having better performance and feasibility on the basis of the simulation data and knowledge base. The feasibility of the method used in this program is confirmed by the preliminary application. This application also emphasizes the importance of the knowledge base for the candidate generation and selection. Although the degree of freedom of the manipulator is restricted to less than 7 degrees in this study, further development of the capability of manipulator simulation (seven or more degrees of freedom) will enhance the effectiveness of this program. (orig.)

  14. Some aspects related to the management of maintenance for a TRIGA research reactor In Romania

    International Nuclear Information System (INIS)

    Vieru, G.

    2003-01-01

    Safety management for a nuclear research reactor involves 'good dependability management' of operations activities, such as: reliability, availability, maintainability and maintenance support. In order to evaluate the safety management aspects intended to be applied by research reactor management, the performance dependability indicators and their impact on reactor availability and reactor safety have to be established. The document ISO 9000-4/IEC 300-1 'Dependability Management' (1995), describes five internationally agreed indicators of reactor equipment dependability. Each of them can be used for corrective maintenance or for preventive maintenance, such as: I 1 - equipment Maintenance Frequency; I 2 - equipment Maintenance Effort; I 3 - equipment Maintenance Downtime Factor; I 4 - equipment Maintenance Contribution to the System Function Downtime Factor; I 5 - equipment Maintenance Contribution to the reactor Capability Loss Factor. This paper presents an evaluation of those 5 mentioned indicators with reference to the primary circuit of the INR's TRIGA research reactor and conclusion. The analyzed period was between 1994- 1999. It is to be noted that this type of analysis is performed for the first time for a research reactor. (author)

  15. Management of research reactor; dynamic characteristics analysis for reactor structures related with vibration of HANARO fuel assembly

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Chang Kee; Shim, Joo Sup [Shinwa Technology Information, Seoul (Korea)

    2001-04-01

    The objective of this study is to deduce the dynamic correlation between the fuel assembly and the reactor structure. Dynamic characteristics analyses for reactor structure related with vibration of HANARO fuel assembly have been performed For the dynamic characteristic analysis, the in-air models of the round and hexagonal flow tubes, 18-element and 36-element fuel assemblies, and reactor structure were developed. By calculating the hydrodynamic mass and distributing it on the in-air models, the in-water models of the flow tubes, the fuel assemblies, and the reactor structure were developed. Then, modal analyses for developed in-air and in-water models have been performed. Especially, two 18-element fuel assemblies and three 36-element fuel assemblies were included in the in-water reactor models. For the verification of the modal analysis results, the natural frequencies and the mode shapes of the fuel assembly were compared with those obtained from the experiment. Finally the analysis results of the reactor structure were compared with them performed by AECL Based on the reactor model without PCS piping, the in-water reactor model including the fuel assemblies was developed, and its modal analysis was performed. The analysis results demonstrate that there are no resonance between the fuel assembly and the reactor structures. 26 refs., 419 figs., 85 tabs. (Author)

  16. Service for maintenance of electronic equipment of the RA reactor, Report for 1977 - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1977-01-01

    This report describes the tasks and organizational structure of the Service for maintenance of electronic equipment of the RA reactor. The most important task of this Service is control and maintenance of the reactor control and protection instruments, operation control, and dosimetry system. Besides data about this basic instrumentation, the report includes data about control and maintenance of other electronic equipment related to the experimental devices [sr

  17. Tests of the RBMK-1500 reactor fuel assemblies in the Leningrad reactor

    International Nuclear Information System (INIS)

    Aden, V.C.; Varovin, I.A.; Vorontsov, B.A.

    1981-01-01

    Test of fuel assemblies of the RBMK-1500 reactor is conducted in the reactor of the Leningrad NPP unit 2 for proving the calculational values of critical power of the RBMK-1500 reactor fuel assemblies adopted in design. The experiment presupposes the maximal approximation of the fuel assembly operation parameters to the calculational critical parameters without bringing into the mode of heat transfer crisis. The experiments are carried out at 500, 850 and 900 MW(el) of the reactor. The maximal channel power made up 472 kW at 20.5 t/h coolant flow rate and 49% mass steam content at the outlet of the channel. It was concluded that there was supply up to the heat transfer crisis in all the investigated modes. Data of temperature measurings of the fuel element cans, readings of the devices of the failure control system of the fuel element cans and external inspection of the assemblies after the tests testify to it [ru

  18. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.; Miokovic, J.

    1982-12-01

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10 13 cm -2 s -1 at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the outdated spare parts

  19. Physical characteristics of GE [General Electric] BWR [boiling-water reactor] fuel assemblies

    International Nuclear Information System (INIS)

    Moore, R.S.; Notz, K.J.

    1989-06-01

    The physical characteristics of fuel assemblies manufactured by the General Electric Company for boiling-water reactors are classified and described. The classification into assembly types is based on the GE reactor product line, the Characteristics Data Base (CDB) assembly class, and the GE fuel design. Thirty production assembly types are identified. Detailed physical data are presented for each assembly type in an appendix. Descriptions of special (nonstandard) fuels are also reported. 52 refs., 1 fig., 6 tabs

  20. Maintenance management at the High Flux Isotope Reactor

    International Nuclear Information System (INIS)

    Farrar, M.B.

    1982-02-01

    Maintenance procedures are described for mechanical and electrical equipment; nuclear and process instrumentation; operational maintenance; equipment and systems inspections; and HFIR quality assurance

  1. Passive gamma analysis of the boiling-water-reactor assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Vo, D., E-mail: ducvo@lanl.gov [Los Alamos National Laboratory, Los Alamos, NM (United States); Favalli, A. [Los Alamos National Laboratory, Los Alamos, NM (United States); Grogan, B. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); Jansson, P. [Uppsala University, Uppsala (Sweden); Liljenfeldt, H. [Oak Ridge National Laboratory, Oak Ridge, TN (United States); Mozin, V. [Lawrence Livermore National Laboratory, Livermore, CA (United States); Schwalbach, P. [European Atomic Energy Community (EURATOM), Luxemburg (Luxembourg); Sjöland, A. [Swedish Nuclear Fuel and Waste Management Company, Stockholm (Sweden); Tobin, S.; Trellue, H. [Los Alamos National Laboratory, Los Alamos, NM (United States); Vaccaro, S. [European Atomic Energy Community (EURATOM), Luxemburg (Luxembourg)

    2016-09-11

    This research focused on the analysis of a set of stationary passive gamma measurements taken on the spent nuclear fuel assemblies from a boiling water reactor (BWR) using pulse height analysis data acquisition. The measurements were performed on 25 different BWR assemblies in 2014 at Sweden's Central Interim Storage Facility for Spent Nuclear Fuel (Clab). This study was performed as part of the Next Generation of Safeguards Initiative–Spent Fuel project to research the application of nondestructive assay (NDA) to spent fuel assemblies. The NGSI–SF team is working to achieve the following technical goals more easily and efficiently than in the past using nondestructive assay (NDA) measurements of spent fuel assemblies: (1) verify the initial enrichment, burnup, and cooling time of facility declaration; (2) detect the diversion or replacement of pins, (3) estimate the plutonium mass, (4) estimate the decay heat, and (5) determine the reactivity of spent fuel assemblies. The final objective of this project is to quantify the capability of several integrated NDA instruments to meet the aforementioned goals using the combined signatures of neutrons, gamma rays, and heat. This report presents a selection of the measured data and summarizes an analysis of the results. Specifically, trends in the count rates measured for spectral lines from the following isotopes were analyzed as a function of the declared burnup and cooling time: {sup 137}Cs, {sup 154}Eu, {sup 134}Cs, and to a lesser extent, {sup 106}Ru and {sup 144}Ce. From these measured count rates, predictive algorithms were developed to enable the estimation of the burnup and cooling time. Furthermore, these algorithms were benchmarked on a set of assemblies not included in the standard assemblies set used by this research team.

  2. TMI cable tracer operation and maintenance manual for assembly 417910

    International Nuclear Information System (INIS)

    Sumstine, R.L.

    1983-11-01

    This manual provides technical information and instructions to operate and maintain the cable tracer designed for the Three Mile Island (TMI) Unit 2 Reactor Building. The TMI cable tracer was developed to allow TMI personnel to trace cables in cable trays that may be tested or sectioned for destructive examination

  3. Operation and maintenance of the RB reactor, Annual report for 1978

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1978-01-01

    The annual report for 1978 includes the following: utilization of the RB reactor; producing the new safety report; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Four annexes to this report are concerned with: operation of the reactor at higher power levels; performance of the instrumentation, radiation doses during operation; gamma radiation doses after reactor shutdown; properties of the neutron converter (optimization of the rector-converter coupling; maintenance of the reactor equipment; purchase of new equipment

  4. Development of prototype reactor maintenance. (2) Application to piping support of sodium-cooled reactor prototype

    International Nuclear Information System (INIS)

    Arai, Masanobu; Kunogi, Kosuke; Aizawa, Kosuke; Chikazawa, Yoshitaka; Takaya, Shigeru; Kubo, Shigenobu; Kotake, Shoji; Ito, Takaya; Yamaguchi, Akira

    2017-01-01

    A maintenance program on piping support of prototype fast breeder reactor Monju are studied. Based on degradation mechanism, snubbers in Monju primary cooling system showed lifetime more than the plant lifetime of 30 years by experiments conservatively. For the first step during construction, visual inspection on accessible all supports could be available. In that visual inspection, mounting conditions and damages of all accessible supports could be monitored. One of major features of the Monju primary piping system is large thermal expansion due to large temperature difference between maintenance and operation conditions. Thanks to that large thermal expansion, integrity of piping supports could be monitored by measuring piping displacement. When technologies of piping displacement monitoring are matured in Monju, visual inspection on piping support could be shifted to piping displacement monitoring. At that stage, the visual inspection could be limited only on representative supports. (author)

  5. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-12-01

    During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation [sr

  6. Wireless sensors for predictive maintenance of rotating equipment in research reactors

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2011-01-01

    In 2008-2009, the High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory (ORNL) tested the potential of predictive or condition-based maintenance techniques to reduce maintenance costs, minimize the risk of catastrophic failures, and maximize system availability by attaching wireless-based sensors to selected rotating equipment at HFIR. Rotating equipment is an ideal 'test case' for the viability of integrated, online predictive maintenance strategies because motors, bearings, and shafts are ubiquitous in nuclear power plants and because the maintenance methods typically performed on rotating equipment today (such as portable or handheld vibration data collection equipment) are highly labor-intensive. The HFIR project achieved all five of its objectives: (1) to identify rotating machinery of the types used in research reactors and determine their operational characteristics, degradation mechanisms, and failure modes, (2) to establish a predictive maintenance program for rotating equipment in research reactors, (3) to identify wireless sensors that are suitable for predictive maintenance of rotating machinery and test them in a laboratory setting, (4) to establish the requirements and procedures to be followed when implementing wireless sensors for predictive maintenance in research reactors, and (5) to develop a conceptual design for a predictive maintenance system for research reactors based on wireless sensors. The project demonstrated that wireless sensors offer an effective method for monitoring key process conditions continuously and remotely, thereby enhancing the safety, reliability, and efficiency of the aging research reactor fleet.

  7. Safe Operation of Critical Assemblies and Research Reactors

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-05-15

    This Manual is provided as a guide to the safe operation of critical assemblies and small research reactors. It is intended that it should be used by all authorities and persons concerned with, or responsible for, the use of such equipment, in addition to the scientists and technologists who are actually working with, or operating it. It is suggested that it will be of use to those wishing to design and manufacture, or purchase, critical assemblies or research reactors, as well as those already in possession of them, and that it will prove particularly helpful to those users who have no direct access to other collected sources of information. This Manual is not a set of rules or a code of practice, but a series of recommendations which must be interpreted with scientific judgement in their application to any particular problem. The guiding principles are given from which good operational procedures may be established and improved. The promulgation of rigid standards is both impossible and undesirable at the present time, since the topics discussed form part of a rapidly growing science and technology. Therefore, any recommendations made should not be used to restrict or inhibit future developments. The Manual is intended mainly for use in those Member States where there has been little experience in the operation of critical assemblies and research reactors. It has been compounded from the best practices which exist in Member States having a large amount of such experience, so that nothing in it should conflict with the best practices to be encountered in the field of safe operation.

  8. Safe Operation of Critical Assemblies and Research Reactors

    International Nuclear Information System (INIS)

    1961-01-01

    This Manual is provided as a guide to the safe operation of critical assemblies and small research reactors. It is intended that it should be used by all authorities and persons concerned with, or responsible for, the use of such equipment, in addition to the scientists and technologists who are actually working with, or operating it. It is suggested that it will be of use to those wishing to design and manufacture, or purchase, critical assemblies or research reactors, as well as those already in possession of them, and that it will prove particularly helpful to those users who have no direct access to other collected sources of information. This Manual is not a set of rules or a code of practice, but a series of recommendations which must be interpreted with scientific judgement in their application to any particular problem. The guiding principles are given from which good operational procedures may be established and improved. The promulgation of rigid standards is both impossible and undesirable at the present time, since the topics discussed form part of a rapidly growing science and technology. Therefore, any recommendations made should not be used to restrict or inhibit future developments. The Manual is intended mainly for use in those Member States where there has been little experience in the operation of critical assemblies and research reactors. It has been compounded from the best practices which exist in Member States having a large amount of such experience, so that nothing in it should conflict with the best practices to be encountered in the field of safe operation.

  9. Reactor Dynamics Experiments with a Sub-Critical Assembly

    International Nuclear Information System (INIS)

    Miley, G.H.; Yang, Y.; Wu, L.; Momota, H.

    2004-01-01

    A resurgence in use of nuclear power is now underway worldwide. However due to the shutdown of many university research reactors , student laboratories must rely more heavily on use of sub-critical assemblies. Here a driven sub-critical is described that uses a cylindrical Inertial Electrostatic Confinement (IEC) device to provide a fusion neutron source. The small IEC neutron source would be inserted in a fuel element position, with its power input controlled externally at a control panel. This feature opens the way to use of the critical assembly for a number of transient experiments such as sub-critical pulsing and neutron wave propagation. That in turn adds important new insights and excitement for the student teaching laboratory

  10. Gripping means for fuel assemblies of nuclear reactor

    International Nuclear Information System (INIS)

    Batjukov, V.I.; Fadeev, A.I.; Shkhian, T.G.; Vjugov, O.N.

    1980-01-01

    The proposed gripping means for fuel assemblies of a nuclear reactor comprises a housing, whereupon there is movably mounted a slider provided with longitudinally extending slots to receive gripping jaws whose tails are pivotably secured to the housing of the gripping means. On one side, the end faces of the longitudinally extending slots are slanted with respect to the longitudinal axis of the gripping means and come in contact with the teeth of the gripping jaws provided on the end which is opposite to the tail, whereby the jaws open as the slider and housing of the gripping means moves relative to each other so that the teeth are received in an internal groove provided in the head of the fuel assembly

  11. Burnable poison rod for a nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Funk, C.E.; Oneufer, A.S.

    1984-01-01

    A burnable poison rod for use in a nuclear reactor fuel assembly which includes concentrically disposed rods having an annular space therebetween which extends the full length of the rods. The inner rod is hollow to permit circulation of coolant therethrough. Annular burnable poison pellets are positioned in the annular space which is closed at both ends by plugs. A spring clip is located in the plenum space above the pellet stack in the rods. The spring clip is of cylindrical configuration having a gap in the material which provides two ends adapted to be squeezed toward each other. A cross section of the clip shows that its ends contain alternating flat and round edges, the round edges conforming to the outer rod inner surface to provide a retentive force which is releasably applied to the pellet stack as it grows during operation in a reactor

  12. Assembly homogenization techniques for light water reactor analysis

    International Nuclear Information System (INIS)

    Smith, K.S.

    1986-01-01

    Recent progress in development and application of advanced assembly homogenization methods for light water reactor analysis is reviewed. Practical difficulties arising from conventional flux-weighting approximations are discussed and numerical examples given. The mathematical foundations for homogenization methods are outlined. Two methods, Equivalence Theory and Generalized Equivalence Theory which are theoretically capable of eliminating homogenization error are reviewed. Practical means of obtaining approximate homogenized parameters are presented and numerical examples are used to contrast the two methods. Applications of these techniques to PWR baffle/reflector homogenization and BWR bundle homogenization are discussed. Nodal solutions to realistic reactor problems are compared to fine-mesh PDQ calculations, and the accuracy of the advanced homogenization methods is established. Remaining problem areas are investigated, and directions for future research are suggested. (author)

  13. Simulating the temperature noise in fast reactor fuel assemblies

    International Nuclear Information System (INIS)

    Kebadze, B.V.; Pykhtina, T.V.; Tarasko, M.Z.

    1987-01-01

    Characteristics of temperature noise at various modes of coolant flow in fast reactor fuel assemblies (FA) and for different points of sensor installation are investigated. Stationary mode of coolant flow and mode with a partial overlapping of FA through cross section, resulting in local temperature increase and sodium boiling, are considered. Numerical simulation permits to evaluate time characteristicsof temperature noise and to formulate requirements for dynamic characteristics of the sensors, and also to clarify the dependence of coolant distribution parameters on the sensor location and peculiarities of stationary temperature profile

  14. Apparatus for securing structural tubes in nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Kerry, J.S.

    1987-01-01

    This patent describes a nuclear reactor fuel assembly having a structural tube with a predetermined inside diameter, a generally cylindrical insert of an axial length substantially smaller than the axial length of the structural tube and having a generally cylindrical passageway of a predetermined diameter smaller than the predetermined inside diameter for providing an effectively reduced inside diameter for the structural tube. The insert comprises: means, having an outside diameter approximately equal to the predetermined inside diameter, for coaxially centering the insert within the structural tube; forming lobes, operable when expanded to locally deform against the structural tube thereby locking the insert within the structural tube

  15. Vectorization and parallelization of a production reactor assembly code

    International Nuclear Information System (INIS)

    Vujic, J.L.; Martin, W.R.; Michigan Univ., Ann Arbor, MI

    1991-01-01

    In order to use efficiently the new features of supercomputers, production codes, usually written 10 -20 years ago, must be tailored for modern computer architectures. We have chosen to optimize the CPM-2 code, a production reactor assembly code based on the collision probability transport method. Substantial speedup in the execution times was obtained with the parallel/vector version of the CPM-2 code. In addition, we have developed a new transfer probability method, which removes some of the modelling limitations of the collision probability method encoded in the CPM-2 code, and can fully utilize the parallel/vector architecture of a multiprocessor IBM 3090. (author)

  16. Basic experiments of reactor physics using the critical assembly TCA

    International Nuclear Information System (INIS)

    Obara, Toru; Igashira, Masayuki; Sekimoto, Hiroshi; Nakajima, Ken; Suzaki, Takenori.

    1994-02-01

    This report is based on lectures given to graduate students of Tokyo Institute of Technology. It covers educational experiments conducted with the Tank-Type Critical Assembly (TCA) at Japan Atomic Energy Research Institute in July, 1993. During this period, the following basic experiments on reactor physics were performed: (1) Critical approach experiment, (2) Measurement of neutron flux distribution, (3) Measurement of power distribution, (4) Measurement of fuel rod worth distribution, (5) Measurement of safety sheet worth by the rod drop method. The principle of experiments, experimental procedure, and analysis of results are described in this report. (author)

  17. Fuel assembly for gas-cooled nuclear reactors

    International Nuclear Information System (INIS)

    Yellowlees, J.M.

    1976-01-01

    A fuel assembly is described for gas-cooled nuclear reactor which consists of a wrapper tube within which are positioned a number of spaced apart beds in a stack, with each bed containing spherical coated particles of fuel; each of the beds has a perforated top and bottom plate; gaseous coolant passes successively through each of the beds; through each of the beds also passes a bypass tube; part of the gas travels through the bed and part passes through the bypass tube; the gas coolant which passes through both the bed and the bypass tube mixes in the space on the outlet side of the bed before entering the next bed

  18. Vectorization and parallelization of a production reactor assembly code

    International Nuclear Information System (INIS)

    Vujic, J.L.; Martin, W.R.

    1991-01-01

    In order to efficiently use new features of supercomputers, production codes, usually written 10 - 20 years ago, must be tailored for modern computer architectures. We have chosen to optimize the CPM-2 code, a production reactor assembly code based on the collision probability transport method. Substantial speedups in the execution times were obtained with the parallel/vector version of the CPM-2 code. In addition, we have developed a new transfer probability method, which removes some of the modelling limitations of the collision probability method encoded in the CPM-2 code, and can fully utilize parallel/vector architecture of a multiprocessor IBM 3090. (author)

  19. Operation and maintenance of the RB reactor, Annual report for 1979

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.; Petronijevic, M.

    1979-01-01

    The annual report for 1979 includes the following: utilization of the RB reactor; accident analysis; dosimetry and radiation protection; description of the reactor equipment status; reactor staff; financial data. Six Annexes to this report are concerned with: scientific program orientation; producing the new safety report; maintenance of the reactor components and equipment; purchase of new equipment; financial report; and program for training the staff of the Krsko NPP

  20. Transfer hood for handling fuel assemblies in nuclear reactors and especially fast reactors

    International Nuclear Information System (INIS)

    Aubert, M.; Merland, D.; Renaux, C.

    1975-01-01

    A description is given of a hood for transferring fuel assemblies between two or more separate guide ramps inclined to the vertical at the same angle of slope and extending respectively through a first passage into the reactor vessel and through a second passage into a fuel-assembly storage chamber. The hood comprises at least one shielded duct joined to a flanged rotating portion which is so arranged that the open lower end of the shielded duct is positioned in the line of extension of one guide ramp and then the other as a result of displacement of the rotating portion

  1. Maintenance management of nuclear power reactors at the stage of research and development

    International Nuclear Information System (INIS)

    Takaya, Shigeru; Chikazawa, Yoshitaka; Kubo, Shigenobu; Hayashida, Kiichi; Tagawa, Akihiro; Yamashita, Atsushi

    2016-07-01

    A maintenance management required to nuclear power reactors at the R and D stage was discussed in this report. It is the most important to ensure safety of nuclear power plants by taking account of characteristics of nuclear power reactors at the R and D stage. In addition, it is needed to establish a system of maintenance management technologies suitable for reactor types. In this report, objectives of maintenance management of nuclear power reactors at the R and D stage were clarified. Next, requirements and consideration for maintenance management of nuclear power reactors at the R and D stage were discussed according to the objectives. 'Code for Maintenance at Nuclear Power Plants' and 'Guide for Maintenance at Nuclear Power Plants' published by the Japan Electric Association were refereed in the discussion. Then, a draft of codes for maintenance management of nuclear power plants at the R and D stage was newly proposed. Finally, an example that the draft codes were applied to components containing sodium, typical components of sodium-cooled fast reactor, was presented. (author)

  2. Seismic Response Analysis of Assembled Reactor Vessel Internals

    International Nuclear Information System (INIS)

    Je, Sang-Yun; Chang, Yoon-Suk; Kang, Sung-Sik

    2015-01-01

    RVIs (Reactor Vessel Internals) perform important safe-related functions such as upholding the nuclear fuel assembly as well as providing the coolant passage of the reactor core and supporting the control rod drive mechanism. Therefore, the components including RVIs have to be designed and constructed taking into account the structural integrity under various accident scenarios. The reliable seismic analysis is essentially demanded to maintain the safe-related functions of RVIs. In this study, a modal analysis was performed based on the previous researches to examine values of frequencies, mode shapes and participation factors. Subsequently, the structural integrity respecting to the earthquake was evaluated through a response spectrum analysis by using the output variables of modal analysis. In this study, the structural integrity of the assembled RVIs was carried out against the seismic event via the modal and response spectrum analyses. Even though 287MPa of the maximum stress value occurred at the connected region between UGS and CSA, which was lower than its allowable value. At present, fluid-structure interaction effects are being examined for further realistic simulation, which will be reported in the near future

  3. Human factors and safety issues associated with actinide retrieval from spent light water reactor fuel assemblies

    International Nuclear Information System (INIS)

    Spelt, P.F.

    1992-01-01

    A major problem in environmental restoration and waste management is the disposition of used fuel assemblies from the many light water reactors in the United States, which present a radiation hazard to those whose job is to dispose of them, with a similar threat to the general environment associated with long-term storage in fuel repositories around the country. Actinides resident in the fuel pins as a result of their use in reactor cores constitute a significant component of this hazard. Recently, the Department of Energy has initiated an Actinide Recycle Program to study the feasibility of using pyrochemical (molten salt) processes to recover actinides from the spent fuel assemblies of commercial reactors. This project concerns the application of robotics technology to the operation and maintenance functions of a plant whose objective is to recover actinides from spent fuel assemblies, and to dispose of the resulting hardware and chemical components from this process. Such a procedure involves a number of safety and human factors issues. The purpose of the project is to explore the use of robotics and artificial intelligence to facilitate accomplishment of the program goals while maintaining the safety of the humans doing the work and the integrity of the environment. This project will result in a graphic simulation on a Silicon Graphics workstation as a proof of principle demonstration of the feasibility of using robotics along with an intelligent operator interface. A major component of the operator-system interface is a hybrid artificial intelligence system developed at Oak Ridge National Laboratory, which combines artificial neural networks and an expert system into a hybrid, self-improving computer-based system interface. 10 refs

  4. Comparison of fuel assemblies in lead cooled fast reactors

    Energy Technology Data Exchange (ETDEWEB)

    Perez, A.; Sanchez, H.; Aguilar, L.; Espinosa P, G., E-mail: alejandria.peval@gmail.com [Universidad Autonoma Metropolitana, Unidad Iztapalapa, San Rafael Atlixco No. 186, Col. Vicentina, 09340 Ciudad de Mexico (Mexico)

    2016-09-15

    This paper presents a comparison of the thermal-fluid processes in the core, fuel heat transfer, and thermal power between two fuel assemblies: square and hexagonal, in a lead-cooled fast reactor (Lfr). A multi-physics reduced order model for the analysis of Lfr single channel is developed in this work. The work focused on a coupling between process of neutron kinetic, fuel heat transfer process and thermal-fluid, in a single channel. The thermal power is obtained from neutron point kinetics model, considering a non-uniform power distribution. The analysis of the processes of thermal-fluid considers thermal expansion effects. The transient heat transfer in fuel is carried out in an annular geometry, and one-dimensional in radial direction for each axial node. The results presented in comparing these assemblies consider the temperature field in the fuel, in the thermal fluid and under steady state, and transient conditions. Transients consider flow of coolant and inlet temperature of coolant. The mathematical model of Lfr considers three main modules: the heat transfer in the annular fuel, the power generation with feedback effects on neutronic, and the thermal-fluid in the single channel. The modeling of nuclear reactors in general, the coupling is crucial by the feedback between the neutron processes with fuel heat transfer, and thermo-fluid, where is very common the numerical instabilities, after all it has to refine the model to achieve the design data. In this work is considered as a reference the ELSY reactor for the heat transfer analysis in the fuel and pure lead properties for analyzing the thermal-fluid. The results found shows that the hexagonal array has highest temperature in the fuel, respect to square array. (Author)

  5. Comparison of fuel assemblies in lead cooled fast reactors

    International Nuclear Information System (INIS)

    Perez, A.; Sanchez, H.; Aguilar, L.; Espinosa P, G.

    2016-09-01

    This paper presents a comparison of the thermal-fluid processes in the core, fuel heat transfer, and thermal power between two fuel assemblies: square and hexagonal, in a lead-cooled fast reactor (Lfr). A multi-physics reduced order model for the analysis of Lfr single channel is developed in this work. The work focused on a coupling between process of neutron kinetic, fuel heat transfer process and thermal-fluid, in a single channel. The thermal power is obtained from neutron point kinetics model, considering a non-uniform power distribution. The analysis of the processes of thermal-fluid considers thermal expansion effects. The transient heat transfer in fuel is carried out in an annular geometry, and one-dimensional in radial direction for each axial node. The results presented in comparing these assemblies consider the temperature field in the fuel, in the thermal fluid and under steady state, and transient conditions. Transients consider flow of coolant and inlet temperature of coolant. The mathematical model of Lfr considers three main modules: the heat transfer in the annular fuel, the power generation with feedback effects on neutronic, and the thermal-fluid in the single channel. The modeling of nuclear reactors in general, the coupling is crucial by the feedback between the neutron processes with fuel heat transfer, and thermo-fluid, where is very common the numerical instabilities, after all it has to refine the model to achieve the design data. In this work is considered as a reference the ELSY reactor for the heat transfer analysis in the fuel and pure lead properties for analyzing the thermal-fluid. The results found shows that the hexagonal array has highest temperature in the fuel, respect to square array. (Author)

  6. Development of inspection and maintenance program for reactor and reactivity control units in HANARO

    International Nuclear Information System (INIS)

    Cho, Yeong-Garp

    1998-01-01

    This paper summarizes the overall program for inspection and maintenance of reactor structure and Reactivity Control Units (RCU) of HANARO during lifetime. The long-term plan for in-service inspection is introduced in the viewpoint of the structural integrity of reactor and RCU, and the operability of RCU mechanism. This program includes the list of components to be inspected, the schedule of inspection and maintenance, and the development of special tools and test rig that are required for the remote inspection and maintenance of reactor and RCU components. Preliminary results of the evaluation on the lifetime of RCU components are summarized based on the operation history since the installation of reactor. A test rig will be designed and constructed for the purposes of verifying the prolonged lifetime of RCU components being used, the performance of special tools, and the rehearsal of maintenance work as well. (author)

  7. Short and long term maintenance strategy for reactor vessel head penetrations

    International Nuclear Information System (INIS)

    Teissier, A.; Heuze, A.

    1995-01-01

    This paper presents elements based on : surveys, operating inspection, theoretical studies, safety analysis, laboratory results, that enabled to determine maintenance options and short and long term strategies for processing on reactor vessel head leaks. (TEC). 1 tab

  8. Fuel assembly for use in BWR type reactor

    International Nuclear Information System (INIS)

    Inaba, Yuzo.

    1988-01-01

    Purpose: To attain the reduction of neutron irradiation amount to control rods by the improvement in the reactor shutdown margin and the improvement of the control rod worth, by enhancing the arrangement of burnable poisons. Constitution: The number of burnable poison-incorporated fuel rods present in the outer two rows along the sides in adjacent with a control rod among the square lattice arrangement in a fuel assembly is decreased to less than 1/4 for that of total burnable poison-incorporated fuel rods, while the remaining burnable posion-incorporated fuel rods are arranged in the region other than above (that is, those regions not nearer to the control rod). Thus, even if a sufficient number of burnable poison to prolong the controlling effect for the reactivity with the burnable contents as the fuel assembly are disposed, only the burnable poison -incorporated fuel rods by the number less than 1/4 for that of the total burnable poison-incorporated fuel rods are present near the control rod of the fuel assembly. Accordingly, the control rod worth at the initial stage of the burning is increased at both high and normal temperatures. (Kawakami, Y.)

  9. Pump/heat exchanger assembly for pool-type reactor

    International Nuclear Information System (INIS)

    Nathenson, R.D.; Slepian, R.M.

    1987-01-01

    A heat exchanger and pump assembly comprising a heat exchanger including a housing for defining an annularly shaped cavity and supporting therein a plurality of heat transfer tubes. A pump is disposed beneath the heat exchanger and is comprised of a plurality of flow couplers disposed in a circular array. Each flow coupler is comprised of a pump duct for receiving a first electrically conductive fluid, i.e. the primary liquid metal, from a pool thereof, and a generator duct for receiving a second electrically conductive fluid, i.e. the intermediate liquid metal. The primary liquid metal is introduced from the reactor pool into the top, inlet ends of the tubes, flowing downward therethrough to be discharged from the tubes' bottom ends directly into the reactor pool. The primary liquid metal is variously introduced into the pump ducts directly from the reactor pool, either from the bottom or top end of the flow coupler. The intermediate fluid introduced into the generator ducts via the inlet duct and inlet plenum and after leaving the generator ducts passes through the annular cavity of the exchanger to cool the primary liquid in the tubes. The annular magnetic field of the pump is produced by a circular array of electromagnets having hollow windings cooled by a flow of the intermediate metal. (author)

  10. Evaluating Virtual Reality and Augmented Reality Training for Industrial Maintenance and Assembly Tasks

    Science.gov (United States)

    Gavish, Nirit; Gutiérrez, Teresa; Webel, Sabine; Rodríguez, Jorge; Peveri, Matteo; Bockholt, Uli; Tecchia, Franco

    2015-01-01

    The current study evaluated the use of virtual reality (VR) and augmented reality (AR) platforms, developed within the scope of the SKILLS Integrated Project, for industrial maintenance and assembly (IMA) tasks training. VR and AR systems are now widely regarded as promising training platforms for complex and highly demanding IMA tasks. However,…

  11. TEMP-M program for thermal-hydraulic calculation of fast reactor fuel assemblies

    International Nuclear Information System (INIS)

    Bogoslovskaya, C.P.; Sorokin, A.P.; Tikhomirov, B.B.; Titov, P.A.; Ushakov, P.A.

    1983-01-01

    TEMP-M program (Fortran, BESM-6 computer) for thermal-hydraulic calculation of fast reactor fuel assemblies is described. Results of calculation of temperature field in a 127 fuel element assembly of BN-600, reactor accomplished according to TEMP-N program are considered as an example. Algorithm, realized in the program, enables to calculate the distributions of coolant heating, fuel element temperature (over perimeter and length) and assembly shell temperature. The distribution of coolant heating in assembly channels is determined from a solution of the balance equation system which accounts for interchannel exchange, nonadiabatic conditions on the assembly shell. The TEMP-M program gives necessary information for calculation of strength, seviceability of fast reactor core elements, serves an effective instrument for calculations when projecting reactor cores and analyzing thermal-hydraulic characteristics of operating reactor fuel assemblies

  12. Intelligent controller of a flexible hybrid robot machine for ITER assembly and maintenance

    International Nuclear Information System (INIS)

    Al-saedi, Mazin I.; Wu, Huapeng; Handroos, Heikki

    2014-01-01

    Highlights: • Studying flexible multibody dynamic of hybrid parallel robot. • Investigating fuzzy-PD controller to control a hybrid flexible hydraulically driven robot. • Investigating ANFIS-PD controller to control a hybrid flexible robot. Compare to traditional PID this method gives better performance. • Using the equilibrium of reaction forces between the parallel and serial parts of hybrid robot to control the serial part hydraulically driven. - Abstract: The assembly and maintenance of International Thermonuclear Experimental Reactor (ITER) vacuum vessel (VV) is highly challenging since the tasks performed by the robot involve welding, material handling, and machine cutting from inside the VV. To fulfill the tasks in ITER application, this paper presents a hybrid redundant manipulator with four DOFs provided by serial kinematic axes and six DOFs by parallel mechanism. Thus, in machining, to achieve greater end-effector trajectory tracking accuracy for surface quality, a robust control of the actuators for the flexible link has to be deduced. In this paper, the intelligent control of a hydraulically driven parallel robot part based on the dynamic model and two control schemes have been investigated: (1) fuzzy-PID self tuning controller composed of the conventional PID control and with fuzzy logic; (2) adaptive neuro-fuzzy inference system-PID (ANFIS-PID) self tuning of the gains of the PID controller, which are implemented independently to control each hydraulic cylinder of the parallel robot based on rod position predictions. The obtained results of the fuzzy-PID and ANFIS-PID self tuning controller can reduce more tracking errors than the conventional PID controller. Subsequently, the serial component of the hybrid robot can be analyzed using the equilibrium of reaction forces at the universal joint connections of the hexa-element. To achieve precise positional control of the end effector for maximum precision machining, the hydraulic cylinder should

  13. Intelligent controller of a flexible hybrid robot machine for ITER assembly and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Al-saedi, Mazin I., E-mail: mazin.al-saedi@lut.fi; Wu, Huapeng; Handroos, Heikki

    2014-10-15

    Highlights: • Studying flexible multibody dynamic of hybrid parallel robot. • Investigating fuzzy-PD controller to control a hybrid flexible hydraulically driven robot. • Investigating ANFIS-PD controller to control a hybrid flexible robot. Compare to traditional PID this method gives better performance. • Using the equilibrium of reaction forces between the parallel and serial parts of hybrid robot to control the serial part hydraulically driven. - Abstract: The assembly and maintenance of International Thermonuclear Experimental Reactor (ITER) vacuum vessel (VV) is highly challenging since the tasks performed by the robot involve welding, material handling, and machine cutting from inside the VV. To fulfill the tasks in ITER application, this paper presents a hybrid redundant manipulator with four DOFs provided by serial kinematic axes and six DOFs by parallel mechanism. Thus, in machining, to achieve greater end-effector trajectory tracking accuracy for surface quality, a robust control of the actuators for the flexible link has to be deduced. In this paper, the intelligent control of a hydraulically driven parallel robot part based on the dynamic model and two control schemes have been investigated: (1) fuzzy-PID self tuning controller composed of the conventional PID control and with fuzzy logic; (2) adaptive neuro-fuzzy inference system-PID (ANFIS-PID) self tuning of the gains of the PID controller, which are implemented independently to control each hydraulic cylinder of the parallel robot based on rod position predictions. The obtained results of the fuzzy-PID and ANFIS-PID self tuning controller can reduce more tracking errors than the conventional PID controller. Subsequently, the serial component of the hybrid robot can be analyzed using the equilibrium of reaction forces at the universal joint connections of the hexa-element. To achieve precise positional control of the end effector for maximum precision machining, the hydraulic cylinder should

  14. Remote maintenance in the building of the reactor of power plants

    International Nuclear Information System (INIS)

    Bonin, R.

    1984-01-01

    Examples describing the different operations requiring remote control for reactor maintenance are given. These operations include: refueling machines (for closure stud, vessel flange cleaning, screwing plug for channel head, swimming pool decontamination) in-service inspection machines (MIS, spider for eddy current testing of steam generator, television) and routine or accidental maintenance (leak detection in water boxes, maintenance spider, opening or closing primary manways, decontamination manipulators and various automatic control devices) [fr

  15. Assembly and maintenance of full scale NIF amplifiers in the amplifier module prototype laboratory (AMPLAB)

    International Nuclear Information System (INIS)

    Horvath, J. A.

    1998-01-01

    Mechanical assembly and maintenance of the prototype National Ignition Facility amplifiers in the Amplifier Module Prototype Laboratory (AMPLAB) at Lawrence Livermore National Laboratory requires specialized equipment designed to manipulate large and delicate amplifier components in a safe and clean manner. Observations made during the operation of this assembly and maintenance equipment in AMPLAB provide design guidance for similar tools being built for the National Ignition Facility. Fixtures used for amplifier frame installation, laser slab and flashlamp cassette assembly, transport, and installation, and in-situ blastshield exchange are presented. Examples include a vacuum slab gripper, slab handling clean crane, slab cassette assembly fixture, sealed transport vehicle for slab cassette movement between the cleanroom and amplifier, slab cassette transfer fixture between the cleanroom and transport vehicle, and equipment needed for frame assembly unit, blastshield, an d flashlamp cassette installation and removal. The use of these tools for amplifier assembly, system reconfiguration, reflector replacement, and recovery from an abnormal occurrence such as a flashlamp explosion is described. Observations are made on the design and operation of these tools and their contribution to the final design

  16. Educational reactor-physics experiments with the critical assemble TCA

    Energy Technology Data Exchange (ETDEWEB)

    Tsutsui, Hiroaki; Okubo, Masaaki; Igashira, Masayuki [Tokyo Inst. of Tech. (Japan); Horiki, Oichiro; Suzaki, Takenori

    1997-10-01

    The Tank-Type Critical Assembly (TCA) of Japan Atomic Energy Research Institute is research equipment for light water reactor physics. In the present report, the lectures given to the graduate students of Tokyo Institute of Technology who participated in the educational experiment course held on 26-30 August at TCA are rearranged to provide useful information for those who will implement educational basic experiments with TCA in the future. This report describes the principles, procedures, and data analyses for (1) Critical approach and Exponential experiment, (2) Measurement of neutron flux distribution, (3) Measurement of power distribution, (4) Measurement of fuel rod worth distribution, and (5) Measurement of safety plate worth by the rod drop method. (author)

  17. Educational reactor-physics experiments with the critical assembly TCA

    International Nuclear Information System (INIS)

    Tsutsui, Hiroaki; Okubo, Masaaki; Igashira, Masayuki; Horiki, Oichiro; Suzaki, Takenori.

    1997-10-01

    The Tank-Type Critical Assembly (TCA) of Japan Atomic Energy Research Institute is research equipment for light water reactor physics. In the present report, the lectures given to the graduate students of Tokyo Institute of Technology who participated in the educational experiment course held on 26-30 August at TCA are rearranged to provide useful information for those who will implement educational basic experiments with TCA in the future. This report describes the principles, procedures, and data analyses for 1) Critical approach and Exponential experiment, 2) Measurement of neutron flux distribution, 3) Measurement of power distribution, 4) Measurement of fuel rod worth distribution, and 5) Measurement of safety plate worth by the rod drop method. (author)

  18. Combined fuel assembly and thimble plug gripper for a nuclear reactor

    International Nuclear Information System (INIS)

    1977-01-01

    This invention relates to an apparatus for loading and unloading a fuel assembly into and from the core of a nuclear reactor and for removing and inserting control rod guide thimble plugs from and into the fuel assembly during a reactor refueling operation in substantially less time than that presently required and in a more reliable, safe and efficient manner. (UK)

  19. Repair and preventive maintenance technology for BWR reactor internals and piping

    International Nuclear Information System (INIS)

    Ootsubo, Tooru; Itou, Takashi; Sakashita, Akihiro

    2009-01-01

    Stress corrosion cracking of welding portion has found in many domestic and foreign BWR reactor internals and Primary Loop Recirculation piping. Also, repair and preventive maintenance technologies for SCC has been developed and/or adopted to BWRs in recent years. This paper introduces the sample of these technologies, such as seal-welding for SCC on BWR reactor internals, preventive maintenance technology for PLR piping such as Corrosion Resistant Cladding, Internal Polishing and Induction Heating Stress Improvement. These technologies are introduced on 'E-Journal of Advanced Maintenance', which is an international journal on a exclusive website of Japan Society of Maintenology. (author)

  20. Spacing grid intended for nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Patterson, J.F.; Flora, B.S.

    1977-01-01

    This invention concerns a new improved type of spacing grid that can be used in nuclear reactor fuel assemblies. Under the invention a spacing grid is provided, preferably of the bimetallic type. This grid includes a set of flexible inconel strips positioned by structural 'zircalloy' fittings, having relatively low neutron absorption characteristics in comparison with systems where the flexible strips are welded in position, or where the spring forms an integral part of the structure. The openings for the fuel elements which are defined by the structural fittings intercrossing are fitted internally with bosses which work in conjunction with a spring directed downwards as from the flexible strip so as to position the individual fuel rods in their respective openings inside the grid structure. These flexible strips are arranged in rows extending in directions which depend on the particular design of the fuel asembly and which contain flexible components so distributed that the loads of the individual springs tend to equalize each other mutually. The reaction load exerting itself on the supporting structure is reduced to the minimum, and this results in a lesser distortion in the reactor and an equalisation of the spring loads [fr

  1. MOCA, Criticality of VVER Reactor Hexagonal Fuel Assemblies

    International Nuclear Information System (INIS)

    KYNCL, Jan

    1994-01-01

    1 - Description of program or function: Criticality problem in neutron transport for hexagonal fuel assembly in VVER nuclear reactor. The assembly is assumed to be either arranged in an infinite hexagonal array or placed in vacuum. The problem is solved in three- dimensional geometry, using standard energy group formalism and assuming that effective scattering cross sections are presented as Legendre polynomial expansions. The code evaluates ten different physical quantities, e.g. multiplication factor, neutron flux per energy group and spatial zone, integrated over angle and power in any zone of the assembly. 2 - Method of solution: Monte Carlo method of successive generations is applied. Computation proceeds according to an analog random process. The code is organized into three blocks: In the first block, the input data are converted to quantities for use in the Monte Carlo calculation. An initial neutron distribution is calculated, which corresponds to a fission spectrum uniform in spatial and angular variables. The main calculations are carried out in the second block (subroutine PROC2). This block is subdivided into geometrical and physical parts. Neutron tracks in individual zones and groups as well as probabilities for the formation of secondary neutrons are calculated. In the third block (subroutine PROC3), the results are evaluated statistically. Effective multiplication coefficients, the neutron flux per group and zone, and respective errors are computed. These quantities serve as a basis for the evaluation of other quantities. The results are either printed or stored for future evaluations. 3 - Restrictions on the complexity of the problem: In the PC version of the program, the maximum number of neutrons is 1000, the maximum number of energy groups is 4, and the maximum number of material compositions is 15. Angular expansion of scattering cross sections is allowed up to P10. These restrictions can easily be removed by increasing input parameters and

  2. Inspection, evaluation and maintenance guidelines for reactor vessel internals in JAPAN

    International Nuclear Information System (INIS)

    Sakashita, Akihiro; Goto, Tomoya; Hirano, Shinro; Dozaki, Koji

    2010-01-01

    Inspection and Evaluation Guidelines for reactor internals has been taken into the Rules on Fitness-for–Service for Nuclear Power Plants of The Japan Society of Mechanical Engineers. It is a base of the maintenance plan of each Nuclear Power Plant. A plant maintenance methodology will have more importance to maintain the plant safety and stable plant operation. This paper introduces the systematization of the maintenance such as repair, replacement, preventive maintenance in these guidelines. Maintenance methodologies are classified follows. Repair: methodology to reinforce degraded parts by some methods or prevent progress of degradation of without replacement of the existing structure when the degradation of structure is actualized. Replacement: methodology to replace the existing structure with new one when the degradation of structure is actualized. Preventive maintenance : methodology to mitigate the damaged condition. When the maintenance methodologies are implemented in the actual plant, we have to consider the feedback of the inspection program and plant life management. (author)

  3. Improvements in or relating to gripping means for handling nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Batjukov, V.I.; Vjugov, O.N.; Fadeev, A.I.; Shkhian, T.G.

    1980-01-01

    A gripping means for handling fuel assemblies, the heads of which are internally recessed to receive gripping jaws, forms part of a reactor refuelling machine and is telescopically accommodated within a manipulator tube of the machine. A through hole is provided to allow cooling medium to be passed through the fuel assemblies to remove afterheat when the gripping means is used to transfer assemblies from a reactor core to spent fuel storage sockets. (author)

  4. Preliminary conceptual design of inspection and maintenance for KALIMER reactor system

    Energy Technology Data Exchange (ETDEWEB)

    Joo, Young Sang; Kim, Seok Hun; Yoo, Bong

    2000-08-01

    In-service inspection and maintenance are very important for improving the safety and availability of nuclear power plants. The conceptual requirements of in-service inspection and maintenance should be reflected in the earlier design process for the verification of the plant operability and reliability. In this report the fundamental approaches of the inspection and maintenance for KALIMER are established to ensure the structural integrity and operability for KALIMER. The general strategy and methodology of maintenance and inspection for the reactor system and components are proposed and described for satisfying the intents of the section XI, division 3, of ASME code and considering the design characteristics of KALIMER.

  5. State of the art of toshiba maintenance techniques for reactor internals

    International Nuclear Information System (INIS)

    Maekawa, Osamu; Hattori, Yasuhiro; Sudo, Akira

    2002-01-01

    As the number of aged plants increases, maintaining the integrity of the reactor pressure vessel and reactor internals in aged plants has become an essential issue to ensure continued stable operation and achieve higher plant operability. A major issue with regard to reactor internals is stress corrosion cracks (SCCs). Laser-applying techniques have many features suitable for preventive maintenance work on reactor internals. Toshiba has developed various laser-applying preventive maintenance techniques and accumulated considerable field experience utilizing these techniques in various aged plants. Moreover, in view of the importance of confirming the soundness of reactor internals in aged plants, Toshiba has developed and applied sophisticated nondestructive testing techniques for this purpose. (author)

  6. Operation and maintenance of the RB reactor, Annual report for 1976

    International Nuclear Information System (INIS)

    Sotic, O.; Vranic, S.

    1976-01-01

    Due to its flexibility and relatively simple construction the RB reactor enabled direct measurements of a series of physical parameters. During 1976 the reactor operation exceeded the plan due to preparation of special experiments planned for the next period. It is planned to operate the reactor at higher power levels (50 W - 10 kw). A need for increasing the neutron flux a neutron converter was built in 1976. preliminary measurements showed that placing the neutron converter next to the reactor vessel enables achievement of irradiation and dosimetry measurements in the fast neutron flux. It is planned to purchase highly enriched fuel for the neutron converter. This annual report includes 5 Annexes with data concerning: operation, irradiation field around the RB reactor, maintenance of reactor components and instrumentation, purchase of new equipment, and the program for training reactor operators

  7. RA reactor operation and maintenance; Pogon i odrzavanje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air.

  8. RA Research reactor, Annual report 1970 - Operation and maintenance

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1970-12-01

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  9. Maintenance of reactor recirculation pumps [Paper No.: II-1

    International Nuclear Information System (INIS)

    Ansari, M.A.; Bhat, K.P.

    1981-01-01

    At Tarapur Atomic Power Station (TAPS), two reactor recirculation pumps are provided, one each for the two reactor units. The performance of pumps has been uniformly good; however, leakage through the cartridge type, two stage, mechanical seals which are installed on these pumps was encountered on few occasions. The paper describes the leakage problems, identification of certain design deficiencies and rectification carried out at TAPS for overcoming these problems. (author)

  10. Evaluation of remote maintenance schemes by plasma equilibrium analysis in Tokamak DEMO reactor

    International Nuclear Information System (INIS)

    Utoh, Hiroyasu; Tobita, Kenji; Asakura, Nobuyuki; Sakamoto, Yoshiteru

    2014-01-01

    Highlights: • The remote maintenance schemes in DEMO reactor were evaluated by the plasma equilibrium analysis. • Horizontal sector transport maintenance scheme requires the largest total PF coil current. • The difference of total PF coil current for MHD equilibrium in between the large segmented divertor maintenance and the segmentalized divertor maintenance was about 10%. - Abstract: The remote maintenance schemes in a DEMO reactor are categorized by insertion direction, blanket segmentation, and divertor maintenance scheme, and are quantitatively evaluated by analysing the plasma equilibrium. The positions of the poloidal field (PF) coil are limited by the size of the toroidal field (TF) coil and the maintenance port layout of each remote maintenance scheme. Because the PF coils are located near the larger TF coil and far from the plasma surface, the horizontal sector transport maintenance scheme requires the largest part of total PF coil current, 25% larger than that required for separated sector transport using vertical maintenance ports with segmented divertor maintenance (SDM). In the unsegmented divertor maintenance (UDM) scheme, the total magnetic stored energy in the PF coils at plasma equilibrium is about 30% larger than that stored in the SDM scheme, but the time required for removal and installation of all the divertor cassettes in the UDM scheme is roughly a third of that required in the SDM scheme because the number of divertor cassettes in the UDM scheme is a third of that in the SDM scheme. From the viewpoint of simple maintenance operations, the merit of the UDM scheme has more merit than the SDM scheme

  11. An independent safety assessment of Department of Energy nuclear reactor facilities: Procedures, operations and maintenance

    International Nuclear Information System (INIS)

    Toto, G.; Lindgren, A.J.

    1981-02-01

    The 1979 accident at the Three Mile Island commercial nuclear power plant has led to a number of studies of nuclear reactors, in both the public and private sectors. One of these is that of the Department of Energy's (DOE) Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee, which has outlined tasks for assessment of 13 reactors owned by DOE and operated by contractors. This report covers one of the tasks, the assessment of procedures, operations, and maintenance at the DOE reactor facilities, based on a review of actual documents used at the reactor sites

  12. RA reactor operation and maintenance in 1989, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Sanovic, V.

    1989-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  13. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex D - Report of the Mechanics Service

    International Nuclear Information System (INIS)

    Sulem, B.

    1985-01-01

    Service for mechanical components at the RA reactor includes: control and maintenance of utility components, mechanical workshop, hot cells and storage. Control and maintenance of main components covers: reactor core, heavy water system, technical water system, gas system. This service is responsible for the following auxiliary systems: transportation units; spent fuel storage pool; special ventilation system; personal protection appliances; hot cells. Maintenance of the reactor building, ventilation, heating, water supply, sewage, fire protection devices, gas and compressed air systems are included [sr

  14. Comparison of problems and experience of core operation with distorted fuel element assemblies in VVER-1000 and PWR reactors

    International Nuclear Information System (INIS)

    Afanas'ev, A.

    1999-01-01

    The main reactors leading to distortion of fuel element assemblies during reactor operation were studied. A series of actions which compensate this effect was proposed. Criteria of operation limitation in VVER-1000 and PWR reactors are described

  15. RA reactor operation and maintenance, Annual report 1974

    International Nuclear Information System (INIS)

    Milosevic, D. et al

    1974-12-01

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m 2 of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems [sr

  16. Conditions of job performance quality during nuclear reactor maintenance

    International Nuclear Information System (INIS)

    Babos, K.; Takacs, J.

    1991-01-01

    The education and training programs of the maintenance personnel at the Paks Nuclear Power Plant, Hungary are described. In addition to well trained personnel, the conditions of job quality involves the preparation of job by proper check lists and availability of documentation, and the inspection and checking of the accomplishment of job tasks. Such an inspection procedure is proposed. (R.P.) 2 figs

  17. Neutronic characteristics of linear-assembly breed-and-burn reactors

    International Nuclear Information System (INIS)

    Petroski, Robert; Forget, Benoit; Forsberg, Charles

    2012-01-01

    Highlights: ► Simple models used to characterize general behavior of linear-assembly B and B reactors. ► Diffusion theory model developed to explain axial distributions, height vs. reactivity. ► Neutron excess concept reformulated to include linear-assembly B and B reactors. ► Designed model of B and B reactor started using melt-refined B and B reactor used fuel. ► Computed doubling time of fuel cycle requiring no chemical separations. - Abstract: Linear-assembly breed-and-burn (B and B) reactors are B and B reactors that use axially connected assemblies similar to conventional LWR or fast reactor fuel assemblies. Methods for analyzing linear-assembly B and B reactors and their fuel cycles are developed and applied. General neutronic characteristics of linear-assembly B and B reactors are analyzed, including the effects that burnup, shuffling sequence, and radial and axial size have on equilibrium-cycle k-effective. The mechanisms that give rise to a highly peaked axial burnup distribution are explained, and a method for predicting peak burnup vs. k-effective based on infinite-medium depletion calculations is developed. Next, the neutron excess concept from previous studies of B and B reactors is extended to apply to linear-assembly B and B reactors, which allows the amount of starter fuel needed to establish a given equilibrium cycle to be calculated. Several example applications of the neutron excess formulation are given. First, an example model of a linear-assembly B and B reactor is analyzed to find the neutron excess cost of an equilibrium cycle. Second, simple one-dimensional models are used to predict the neutron excess value obtainable from different starter fuel configurations. Finally, these ideas are applied to design a fuel cycle consisting of linear-assembly B and B reactors and fuel recycling via a melt refining process. The neutron excess concept is used to design an appropriate starter fuel configuration made from melt refined fuel, which

  18. Fuel assemblies for use in BWR type reactors

    International Nuclear Information System (INIS)

    Hirukawa, Koji.

    1987-01-01

    Purpose: To moderate the peak configuration of the burnup degree change curve for the infinite multiplication factor by applying an improvement to the arrangement of fuel rods. Constitution: In a fuel assembly for a BWR type reactor comprising a plurality of fuel rods and water rods arranged in a square lattice, fuel rods containing burnable poisons are arranged at four corners at the second and the third layers from the outside of the square lattice arrangement. Among them, the Cd poison effect in the burnable poison incorporated fuel rods disposed at the second layer is somewhat greater at the initial burning stage and then rapidly decreased along with burning. While on the other hand, the poison effect of the burnable poison-incorporated fuel rods at the third layer is smaller than that at the second layer at the initial burning stage and the reduction in the poison effect due to burning is somewhat more moderate. Since these fuel rods are in adjacent with each other, they interfere to each other and also provide an effect of moderating the burning of the burnable poisons. (Takahashi, M.)

  19. Handling apparatus for a nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Shallenberger, J.M.; Hornak, L.P.; Desmarchais, W.E.

    1978-01-01

    An apparatus is disclosed for handling radioactive fuel assembly during transfer operations. The radioactive fuel assembly is drawn up into a shielding sleeve which substantially reduces the level of radioactivity immediately surrounding the sleeve thereby permitting direct access by operating personnel. The lifting assembly which draws the fuel assembly up within the shielding sleeve is mounted to and forms an integral part of the handling apparatus. The shielding sleeve accompanies the fuel assembly during all of the transfer operations

  20. Twelfth biennial conference on reactor operating experience maintenance and modifications for availability and efficiency

    International Nuclear Information System (INIS)

    1985-01-01

    Separate abstracts were prepared for the papers presented in the following topical sessions: (1) Formal Availability Improvement Programs; (2) Maintenance Aids and Diagnostics; (3) Nuclear Plant Inspection and Testing; (4) Secondary Cycle Improvement to Programs; (5) Recent Plant Experiences; (6) Training, Research, and Test Reactors; (7) Impact of Plant Maintenance on Availability; (8) Intragranular Stress Corrosion Cracking: Repair, Inspection, and Mitigating Techniques; (9) Availability Improvement - Recent Development and Trends; (10) Water Chemistry and Corrosion Control; and (11) ALARA: Experiences with Dose Reduction

  1. Operation and maintenance of the RA reactor in 1964, I-II, Part I

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1964-12-01

    During 1964, the Reactor as operated about 20 days each months at nominal power of 6.5 MW, 5 days at lower power levels and 5 days were used for maintenance. Total production was 27930 MWh which is 11.7% higher than the planned value. Fuel exchange was done 3 times during this period, 98 spent fuel channels were exchanged. In addition to routine maintenance of reactor components and instruments a series of analyses of heavy water and helium were done. Special attention was devoted to corrosion analyses of the reactor materials because of the heavy water system was refurbished decontaminated in 1963. Utilization of the experimental space in the reactor was better that previously. 546 samples were irradiated till the end of November, of which 443 for users from the Institute. Specific irradiations in the fast neutron flux were done in six VISA-2 channels in the core

  2. Decision, Annex 3[Organizational structure of the Division for reactor maintenance]; Prilog br. 3, Odluka

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Reaktor RA, Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1965-12-15

    The objective of the decision about the change in the organizational scheme of the Division for RA reactor maintenance is to achieve efficiency. The tasks are precisely defined as to divide the maintenance and repair tasks from special ones related to improvement of reactor operation its applicability. [Serbo-Croat] U cilju poboljsanja organizacije rada Odelenja odrzavanja reaktora RA, kao i efikasnijeg koriscenja raspolozivog kadra izvrsice se razgranicenje poslova odrzavanja i remonta od posebnih zadataka koji se odnose na poboljsanje rada reaktora i povecanje njegovih mogucnosti.

  3. Financial report on the investment and maintenance of the RA reactor and equipment, Annex 5

    International Nuclear Information System (INIS)

    2002-01-01

    For the purpose of maintenance of the RA reactor building and equipment, Serbian Ministry of science, technology and development has approved financial support for the following: purchase and installing 12 new battery cells in the reactor building, for purchase of the missing fire protection equipment, and purchasing the material for protection of the roof of the ventilation center. All the planned tasks were fulfilled [sr

  4. Housing maintenance of primary cooling pump I of Kartini reactor

    International Nuclear Information System (INIS)

    Agung Nugroho; Wahyu Imam W

    2013-01-01

    Housing maintenance of Primary Cooling Pump have been done with purpose to enhance capability of fluid block and stopping leakage. The procedures of modification are follow: Replace mechanical seal type Nock 560 – 1 ½'' by mechanical seal type Nock 560 - 38, modification gland plate/housing with to lathe the diameter of gland plate/housing from diameter of 54 mm to 60 mm, in size setting-up mechanical seal, alignment and then function test. The result of the modification are: mechanical seal has been installed, housing has been modified, and the leakage of primary cooling water has been repaired and operated properly. Conclusion of the maintenance are the primary cooling water pump is working well, because the primary cooling water is not leakage any more. (author)

  5. Mechanical Design Concept of Fuel Assembly for Prototype GEN-IV Sodium-cooled Fast Reactor

    International Nuclear Information System (INIS)

    Yoon, K. H.; Lee, C. B.

    2014-01-01

    The prototype GEN-IV sodium-cooled fast reactor (PGSFR) is an advanced fast reactor plant design that utilizes compact modular pool-type reactors sized to enable factory fabrication and an affordable prototype test for design certification at minimum cost and risk. The design concepts of the fuel assembly (FA) were introduced for a PGSFR. Unlike that for the pressurized water reactor, there is a neutron shielding concept in the FA and recycling metal fuel. The PGSFR core is a heterogeneous, uranium-10% zirconium (U-10Zr) metal alloy fuel design with 112 assemblies: 52 inner core fuel assemblies, 60 outer core fuel assemblies, 6 primary control assemblies, 3 secondary control assemblies, 90 reflector assemblies and 102 B4C shield assemblies. This configuration is shown in Fig. 1. The core is designed to produce 150 MWe with an average temperature rise of 155 .deg. C. The inlet temperature is 390 .deg. C and the bulk outlet temperature is 545 .deg. C. The core height is 900 mm and the gas plenum length is 1,250 mm. A mechanical design of a fuel assembly for a PGSFR was established. The mechanical design concepts are well realized in the design. In addition to this, the analytical and experimental works will be carries out for verifying the design soundness

  6. Mechanical Design Concept of Fuel Assembly for Prototype GEN-IV Sodium-cooled Fast Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, K. H.; Lee, C. B. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    The prototype GEN-IV sodium-cooled fast reactor (PGSFR) is an advanced fast reactor plant design that utilizes compact modular pool-type reactors sized to enable factory fabrication and an affordable prototype test for design certification at minimum cost and risk. The design concepts of the fuel assembly (FA) were introduced for a PGSFR. Unlike that for the pressurized water reactor, there is a neutron shielding concept in the FA and recycling metal fuel. The PGSFR core is a heterogeneous, uranium-10% zirconium (U-10Zr) metal alloy fuel design with 112 assemblies: 52 inner core fuel assemblies, 60 outer core fuel assemblies, 6 primary control assemblies, 3 secondary control assemblies, 90 reflector assemblies and 102 B4C shield assemblies. This configuration is shown in Fig. 1. The core is designed to produce 150 MWe with an average temperature rise of 155 .deg. C. The inlet temperature is 390 .deg. C and the bulk outlet temperature is 545 .deg. C. The core height is 900 mm and the gas plenum length is 1,250 mm. A mechanical design of a fuel assembly for a PGSFR was established. The mechanical design concepts are well realized in the design. In addition to this, the analytical and experimental works will be carries out for verifying the design soundness.

  7. Improvements in and relating to drums for storing fuel assemblies of nuclear reactors

    International Nuclear Information System (INIS)

    Artemiev, L.N.; Batjukov, V.I.; Fadeev, A.I.

    1977-01-01

    A specification is given for an improved design of drums used for storing nuclear reactor fuel assemblies. It is claimed that this new design reduces wear, increases reliability and enables the recharging operation to be speeded up. (UK)

  8. Chatter suppression methods of a robot machine for ITER vacuum vessel assembly and maintenance

    International Nuclear Information System (INIS)

    Wu, Huapeng; Wang, Yongbo; Li, Ming; Al-Saedi, Mazin; Handroos, Heikki

    2014-01-01

    Highlights: •A redundant 10-DOF serial-parallel hybrid robot for ITER assembly and maintains is presented. •A dynamic model of the robot is developed. •A feedback and feedforward controller is presented to suppress machining vibration of the robot. -- Abstract: In the process of assembly and maintenance of ITER vacuum vessel (ITER VV), various machining tasks including threading, milling, welding-defects cutting and flexible hose boring are required to be performed from inside of ITER VV by on-site machining tools. Robot machine is a promising option for these tasks, but great chatter (machine vibration) would happen in the machining process. The chatter vibration will deteriorate the robot accuracy and surface quality, and even cause some damages on the end-effector tools and the robot structure itself. This paper introduces two vibration control methods, one is passive and another is active vibration control. For the passive vibration control, a parallel mechanism is presented to increase the stiffness of robot machine; for the active vibration control, a hybrid control method combining feedforward controller and nonlinear feedback controller is introduced for chatter suppression. A dynamic model and its chatter vibration phenomena of a hybrid robot is demonstrated. Simulation results are given based on the proposed hybrid robot machine which is developed for the ITER VV assembly and maintenance

  9. Chatter suppression methods of a robot machine for ITER vacuum vessel assembly and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Wu, Huapeng; Wang, Yongbo, E-mail: yongbo.wang@lut.fi; Li, Ming; Al-Saedi, Mazin; Handroos, Heikki

    2014-10-15

    Highlights: •A redundant 10-DOF serial-parallel hybrid robot for ITER assembly and maintains is presented. •A dynamic model of the robot is developed. •A feedback and feedforward controller is presented to suppress machining vibration of the robot. -- Abstract: In the process of assembly and maintenance of ITER vacuum vessel (ITER VV), various machining tasks including threading, milling, welding-defects cutting and flexible hose boring are required to be performed from inside of ITER VV by on-site machining tools. Robot machine is a promising option for these tasks, but great chatter (machine vibration) would happen in the machining process. The chatter vibration will deteriorate the robot accuracy and surface quality, and even cause some damages on the end-effector tools and the robot structure itself. This paper introduces two vibration control methods, one is passive and another is active vibration control. For the passive vibration control, a parallel mechanism is presented to increase the stiffness of robot machine; for the active vibration control, a hybrid control method combining feedforward controller and nonlinear feedback controller is introduced for chatter suppression. A dynamic model and its chatter vibration phenomena of a hybrid robot is demonstrated. Simulation results are given based on the proposed hybrid robot machine which is developed for the ITER VV assembly and maintenance.

  10. Operation and maintenance of the RA reactor in 1965

    International Nuclear Information System (INIS)

    Milosevic, D.

    1966-01-01

    It has been planned for 1965 that the RA reactor would be operated each month for 20 days at nominal power of 6.5 MW, at lower power for 5 days, meaning production of 27 400 MWh. The plan was fulfilled since reactor produced 28809 MWh, i.e. 5% more than planned. Reactor was used for irradiation in the vertical experimental channels according to the demand of 1264 users from the Institute and 191 external users. Two groups of experiments done: at nominal power simultaneously with isotope production and experiments which demanded particular power levels and temperatures. Three fuel exchanges were done during this year, meaning that 40 fuel channels were changed in total. Vertical experimental channels VEK-1 and VEK-9 having diameter 100 mm were changed by channels having diameter 50 mm and shortened by 435 mm. Channel VEK-5 with diameter 110 mm was changed shortened by 430 mm. This enabled better fuel economy, the burnup was increased from 4500 MWd/t to 5000 MWd/t. This report contains the action plan for 1966

  11. Maintenance Cycle Extension in the IRIS Advanced Light Water Reactor Plant Design

    International Nuclear Information System (INIS)

    Galvin, Mark R.; Todreas, Neil E.; Conway, Larry E.

    2003-01-01

    New nuclear power generation in the United States will be realized only if the economic performance can be made competitive with other methods of electrical power generation. The economic performance of a nuclear power plant can be significantly improved by increasing the time spent on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Maintenance includes planned actions (surveillances) and unplanned actions (corrective maintenance) to respond to component degradation or failure. A methodology is described that can be used to resolve, in the design phase, maintenance-related operating cycle length barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the International Reactor, Innovative and Secure (IRIS) design. IRIS is an advanced light water nuclear power plant that is being designed to maximize this on-line generating time by increasing the operating cycle length. This is consequently a maintenance strategy paper using the IRIS plant as the example.Potential IRIS operating cycle length maintenance-related barriers, determined by modification of an earlier operating pressurized water reactor (PWR) plant cycle length analysis to account for differences between the design of IRIS and this operating PWR, are presented. The proposed methodology to resolve these maintenance-related barriers by the design process is described. The results of applying the methodology to two potential IRIS cycle length barriers, relief valve testing and emergency heat removal system testing, are presented

  12. Preliminary neutronics calculation of fusion-fission hybrid reactor breeding spent fuel assembly

    International Nuclear Information System (INIS)

    Ma Xubo; Chen Yixue; Gao Bin

    2013-01-01

    The possibility of using the fusion-fission hybrid reactor breeding spent fuel in PWR was preliminarily studied in this paper. According to the fusion-fission hybrid reactor breeding spent fuel characteristics, PWR assembly including fusion-fission hybrid reactor breeding spent fuel was designed. The parameters such as fuel temperature coefficient, moderator temperature coefficient and their variation were investigated. Results show that the neutron properties of uranium-based assembly and hybrid reactor breeding spent fuel assembly are similar. The design of this paper has a smaller uniformity coefficient of power at the same fissile isotope mass percentage. The results will provide technical support for the future fusion-fission hybrid reactor and PWR combined with cycle system. (authors)

  13. WWER-440 control assembly local power peaking investigation on LR-0 reactor

    International Nuclear Information System (INIS)

    Mikus, J.

    2002-01-01

    This paper presents information concerning the local power peaking problem induced by the WWER-440 control assembly and the investigation possibilities on the light water, zero power reactor LR-0 at the Nuclear Research Institute (NRI) Rez plc. A brief description is given about the disposable control assembly model, experimental arrangement and conditions on the LR-0 reactor with regard to the earlier performed investigations as well as to the relevant measurements to be realized in the near future.(abstract)

  14. The design and use of proficiency based BWR reactor maintenance and refuelling training mockups

    International Nuclear Information System (INIS)

    Ford, G.J.

    1996-01-01

    The purpose of this paper is to describe the ABB experience with the design and use of boiling water reactor training facilities. The training programs were developed and implemented in cooperation with the nuclear utilities. ABB operates two facilities, the ABB ATOM Light Water Reactor Service Center located in Vasteras, Sweden, and the ABB Combustion Engineering Nuclear Operations BWR Training Center located in Chattanooga, Tennessee, USA. The focus of the training centers are reactor maintenance and refueling activities plus the capability to develop and qualify tools, procedures and repair techniques

  15. Operation and maintenance experience at the General Atomic Company's TRIGA reactor facility at San Diego, California

    International Nuclear Information System (INIS)

    Whittemore, W.L.; Stout, W.A.; Shoptaugh, J.R.; Chesworth, R.H.

    1982-01-01

    Since the startup of the original 250 kW TRIGA Mark I reactor in 1958, General Atomic Company has accumulated nearly 24 years of operation and maintenance experience with this type of reactor. In addition to the nearly 24 years of experience gained on the Mark I, GA has operated the 1.5 MW Advanced Prototype Test Reactor (Mark F) for 22 years and operated a 2 MW below-ground TRIGA Mark III for five years. Information obtained from normal and abnormal operation are presented. (author)

  16. An alternative solution for heavy liquid metal cooled reactors fuel assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Vitale Di Maio, Damiano, E-mail: damiano.vitaledimaio@uniroma1.it [“SAPIENZA” University of Rome – DIAEE, Corso Vittorio Emanuele II, 244, 00186 Rome (Italy); Cretara, Luca; Giannetti, Fabio [“SAPIENZA” University of Rome – DIAEE, Corso Vittorio Emanuele II, 244, 00186 Rome (Italy); Peluso, Vincenzo [“ENEA”, Via Martiri di Monte Sole 4, 40129 Bologna (Italy); Gandini, Augusto [“SAPIENZA” University of Rome – DIAEE, Corso Vittorio Emanuele II, 244, 00186 Rome (Italy); Manni, Fabio [“SRS Engineering Design S.r.l.”, Vicolo delle Palle 25-25/b, 00186 Rome (Italy); Caruso, Gianfranco [“SAPIENZA” University of Rome – DIAEE, Corso Vittorio Emanuele II, 244, 00186 Rome (Italy)

    2014-10-15

    Highlights: • A new fuel assembly locking system for heavy metal cooled reactor is proposed. • Neutronic, mechanical and thermal-hydraulic evaluations of the system behavior have been performed. • A comparison with other solutions has been presented. - Abstract: In the coming future, the electric energy production from nuclear power plants will be provided by both thermal reactors and fast reactors. In order to have a sustainable energy production through fission reactors, fast reactors should provide an increasing contribution to the total electricity production from nuclear power plants. Fast reactors have to achieve economic and technical targets of Generation IV. Among these reactors, Sodium cooled Fast Reactors (SFRs) and Lead cooled Fast Reactors (LFRs) have the greatest possibility to be developed as industrial power plants within few decades. Both SFRs and LFRs require a great R and D effort to overcome some open issues which affect the present designs (e.g. sodium-water reaction for the SFRs, erosion/corrosion for LFRs, etc.). The present paper is mainly focused on LFR fuel assembly (FA) design: issues linked with the high coolant density of lead or lead–bismuth eutectic cooled reactors have been investigated and an innovative solution for the core mechanical design is here proposed and analyzed. The solution, which foresees cylindrical fuel assemblies and exploits the buoyancy force due to the lead high density, allows to simplify the FAs locking system, to reduce their length and could lead to a more uniform neutron flux distribution.

  17. Surveillance and Maintenance Plan for the 105-C Reactor Safe Storage Enclosure

    International Nuclear Information System (INIS)

    Logan, T. E.

    1998-01-01

    This document provides a plan for implementing surveillance and maintenance activities to ensure that the 105-C Reactor Safe Storage Enclosure is maintained in a safe, environmentally secure, and cost-effective manner until subsequent closure during the final disposition phase of decommissioning

  18. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    Energy Technology Data Exchange (ETDEWEB)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap [Multipurpose Research Reactor G.A. Siwabessy, National Nuclear Energy Agency (Indonesia)

    1999-10-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  19. Predictive maintenance technology development at G.A. Siwabessy multipurpose reactor

    International Nuclear Information System (INIS)

    Jupiter Sitorus Pane; Imron, M.; Sapto Hartoko; Sentot Alibasya Harahap

    1999-01-01

    Safe operation of reactor is certainly influenced by condition of system and component equipped to the reactor's system. In order to maintain the condition of that systems and components, RSG-GAS has arranged maintenance program with time-basis. All 6 (six) groups of reactor systems are maintained within interval of weekly, monthly, three monthly, six-monthly, yearly, five-yearly appropriately. The experience showed that event though the maintenance was performed persistently, the condition of system and component are still not able to determine exactly. The possibility of accidental failure is open since the failure factor are varied and complicated. In order to limit an uncertainty of the component condition a based maintenance shall be introduced. An infrared investigation and manual vibration analysis had been used to diagnose the condition of some RSG-GAS' components. In addition, other alternative technology for predictive maintenance was developed. It is started by computerizing the database maintenance and doing historical review for its aging management, and developing data acquisition and processing equipment using Lab View computer program for collecting and processing signal data from dynamics system. This paper describes briefly the status of those development results. (author)

  20. Centrioles initiate cilia assembly but are dispensable for maturation and maintenance in C. elegans.

    Science.gov (United States)

    Serwas, Daniel; Su, Tiffany Y; Roessler, Max; Wang, Shaohe; Dammermann, Alexander

    2017-06-05

    Cilia are cellular projections that assemble on centriole-derived basal bodies. While cilia assembly is absolutely dependent on centrioles, it is not known to what extent they contribute to downstream events. The nematode C. elegans provides a unique opportunity to address this question, as centrioles do not persist at the base of mature cilia. Using fluorescence microscopy and electron tomography, we find that centrioles degenerate early during ciliogenesis. The transition zone and axoneme are not completely formed at this time, indicating that cilia maturation does not depend on intact centrioles. The hydrolethalus syndrome protein HYLS-1 is the only centriolar protein known to remain at the base of mature cilia and is required for intraflagellar transport trafficking. Surprisingly, targeted degradation of HYLS-1 after initiation of ciliogenesis does not affect ciliary structures. Taken together, our results indicate that while centrioles are essential to initiate cilia formation, they are dispensable for cilia maturation and maintenance. © 2017 Serwas et al.

  1. CONSIDERATIONS UPON DESIGNING MODULAR CONSTRUCTIONS FOR IMPROVING THE PRODUCTS ASSEMBLING, MAINTENANCE AND RECYCLING PROCESSES

    Directory of Open Access Journals (Sweden)

    BÂRSAN Lucian

    2015-11-01

    Full Text Available Modular constructions are frequently used in industry because of their multiple advantages. Used from the antiquity as a measuring system that ensured good proportions for the objects or buildings, the module is used in present industry as a tool for improving the product maintenance, repair, upgrading, and/or recycling. Modular constructions can be assembled and disassembled easily, facilitating the postuse actions like subassemblies reuse, or materials recovering for the recycling process. An important aspect of this paper is that designers should create the modular solution even from the conceptual design stage and build a structure of functions based on well motivated arguments and which can easily be brake out according to technological possibilities, product functioning and assembly solutions.

  2. The data collection system for failure/maintenance at the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Casey, M.A.; Gruetzmacher, K.M.; Bartlit, J.R.; Cadwallader, L.C.

    1988-01-01

    A data collection system for obtaining information which can be used to help determine the reliability and vailability of future fusion power plants has been installed at the Los Alamos National Laboratory's Tritium Systems Test Assembly (TSTA). Failure and maintenance data on components of TSTA's tritium systems have been collected since 1984. The focus of the data collection has been TSTA's Tritium Waste Tratment System (TWT), which has maintained high availability since it became operation in 1982. Data collection is still in progress and a total of 291 failure reports are in the data collection system at this time, 47 of which are from the TWT. 6 refs., 2 figs., 2 tabs

  3. Preliminary shielding design evaluation for reactor assembly of SMART

    International Nuclear Information System (INIS)

    Kim, Kyo Youn; Kang, Chang M.; Kim, Ha Yong; Zee, Sung Quun; Chang, Moon Hee

    1999-03-01

    This report describes a preliminary evaluations of SMART shielding design near the reactor core by using the DORT two-dimensional discrete ordinates transport code. The results indicate that maximum neutron fluence at the bottom of reactor vessel is 1.64x10 17 n/cm 2 and that on the radial surface of reactor vessel is 6.71x10 16 n/cm 2 . These results meet the requirement, 1.0x10 20 n/cm 2 , in 10 CFR 50.61 and the integrity of SMART reactor vessel is confirmed during the lifetime of reactor. (Author). 20 refs., 11 tabs., 8 figs

  4. Method for determining the outlet temperature of fuel assemblies unsupplied with thermometer in WWER-440 reactors

    International Nuclear Information System (INIS)

    Miko, S.; Kalya, Z.; Hamvas, I.

    1987-09-01

    The paper outlines a method for the evaluation of the outlet temperatures of fuel assemblies unsupplied with thermometer in WWER-440 reactors. The process is based on interpolation of directly measured assembly temperatures. A quantitative comparison of the errors of described algorithm to those of standard plant-computer interpolation rutine is also presented. (author)

  5. Methods of assembling and disassembling spider and burnable poison rod structures for nuclear reactors

    International Nuclear Information System (INIS)

    Walton, L.A.

    1981-01-01

    A method is described of joining burnable poison rods to the spider arms of a pressurised water power reactor fuel assembly which is proof against the reactor core environment but permits these rods to be removed from the spider simply, swiftly and delicately. (U.K.)

  6. Optimization of Two-Level Disassembly/Remanufacturing/Assembly System with an Integrated Maintenance Strategy

    Directory of Open Access Journals (Sweden)

    Zouhour Guiras

    2018-04-01

    Full Text Available With an increase of environmental pressure on economic activities, reverse flow is increasingly important. It seeks to save resources, eliminate waste, and improve productivity. This paper investigates the optimization of the disassembly, remanufacturing and assembly system, taking into account assembly-disassembly system degradation. An analytical model is developed to consider disassembly, remanufacturing of used/end-of-life product and assembly of the finished product. The finished product is composed of remanufactured and new components. A maintenance policy is sequentially integrated to reduce the system unavailability. The aim of this study is to help decision-makers, under certain conditions, choose the most cost-effective process for them to satisfy the customer as well as to adapt to the potential risk that can perturb the disassembly-assembly system. A heuristic is developed to determine the optimal ordered date of the used end-of-life product as well as the optimum release dates of new external components. The results reveal that considering some remanufacturing and purchase components costs, the proposed model is more economical in comparison with a model without remanufactured parts. Numerical results are provided to illustrate the impact of the variation of the ordering cost and quality of the used end-of-life product on the system profitability. Finally, the risk due to system repair periods is discussed, which has an impact on managerial decision-making.

  7. Basic Characteristics of Human Erroneous Actions during Test and Maintenance Activities Leading to Unplanned Reactor Trips

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Park, Jin Kyun

    2010-01-01

    Test and maintenance (T and M) activities of nuclear power plants are essential for sustaining the safety of a power plant and maintaining the reliability of plant systems and components. However, the potential of human errors during T and M activities has also the potential to induce unplanned reactor trips or power derate or making safety-related systems unavailable. According to the major incident/accident reports of nuclear power plants in Korea, contribution of human errors takes up about 20% of the total events. The previous study presents that most of human-related unplanned reactor trip events during normal power operation are associated with T and M activities (63%), which are comprised of plant maintenance activities such as a 'periodic preventive maintenance (PPM)', a 'planned maintenance (PM)' and a 'corrective maintenance (CM)'. This means that T and M activities should be a major subject for reducing the frequency of human-related unplanned reactor trips. This paper aims to introduce basic characteristics of human erroneous actions involved in the test and maintenance-induced unplanned reactor trip events that have occurred between 1986 and 2006 in Korean nuclear power plants. The basic characteristics are described by dividing human erroneous actions into planning-based errors and execution-based errors. For the events associated with planning failures, they are, firstly, classified according to existence of the work procedure and then described for what aspects of the procedure or work plan have deficiency or problem. On the other hand, for the events associated with execution failures, they are described from the aspect of external error modes

  8. On-line system for monitoring of boiling in nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Tuerkcan, E.; Kozma, R.; Verhoef, J.P.; Nabeshima, K.

    1996-01-01

    An important goal of nuclear reactor instrumentation is the continuous monitoring of the state of the reactor and the detection of deviations from the normal behaviour at an early stage. Early detection of anomalies enables one to make the necessary steps in order to prevent further damage of nuclear fuel. In the present paper, an on-line core monitoring system is described by means of which boiling anomaly in nuclear reactor fuel assemblies can be detected. (author). 9 refs, 7 figs

  9. The dynamic pressure measurements of the nuclear reactor coolant for condition-based maintenance of the reactor

    International Nuclear Information System (INIS)

    Es-Saheb, M.H.H.

    1990-01-01

    The condition-based maintenance of the nuclear reactor, by monitoring and measuring the instantaneous dynamic pressure distribution of the coolant (water) impact on the solid surfaces of the reactor during operation is presented. The behaviour of water domes (jets) produced by underwater explosions of small changes of P.E.T.N. at various depths in two different size cylindrical containers, which simulate the nuclear reactor, is investigated. Water surface domes (jets) from the underwater explosions are photographed. Depending on the depth of the charge, curved and flat top jets of up to 455 mm diameter and impact speeds of up to 70 m/sec. are observed. The instabilities in the dome surfaces are observed and the instantaneous profiles are analysed. It is found that, in all cases tested, the maximum pressure takes place at the center of the jet and could reach up to 3.0 times the on-dimensional impact pressure value. The use of their measurements, as online monitoring for condition-based maintenance and design-out maintenance is discussed. 18 refs

  10. Reliability Centered Maintenance (RCM) Methodology and Application to the Shutdown Cooling System for APR-1400 Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Faragalla, Mohamed M.; Emmanuel, Efenji; Alhammadi, Ibrahim; Awwal, Arigi M.; Lee, Yong Kwan [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2016-10-15

    Shutdown Cooling System (SCS) is a safety-related system that is used in conjunction with the Main Steam and Main or Auxiliary Feedwater Systems to reduce the temperature of the Reactor Coolant System (RCS) in post shutdown periods from the hot shutdown operating temperature to the refueling temperature. In this paper RCM methodology is applied to (SCS). RCM analysis is performed based on evaluation of Failure Modes Effects and Criticality Analysis (FME and CA) on the component, system and plant. The Logic Tree Analysis (LTA) is used to determine the optimum maintenance tasks. The main objectives of RCM is the safety, preserve the System function, the cost-effective maintenance of the plant components and increase the reliability and availability value. The RCM methodology is useful for improving the equipment reliability by strengthening the management of equipment condition, and leads to a significant decrease in the number of periodical maintenance, extended maintenance cycle, longer useful life of equipment, and decrease in overall maintenance cost. It also focuses on the safety of the system by assigning criticality index to the various components and further selecting maintenance activities based on the risk of failure involved. Therefore, it can be said that RCM introduces a maintenance plan designed for maximum safety in an economical manner and making the system more reliable. For the SCP, increasing the number of condition monitoring tasks will improve the availability of the SCP. It is recommended to reduce the number of periodic maintenance activities.

  11. Detailed channel thermal-hydraulic calculation of nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Zhukov, A.V.; Sorokin, A.P.; Ushakov, P.A.; Yur'ev, Yu.S.

    1981-01-01

    The system of equations of mass balance, quantity of motion and energy used in calculation of nuclear reactor fuel assemblies is obtained. The equation system is obtained on the base of integral equations of hydrodynamics interaction in assemblies of smooth fuel elements and fuel elements with wire packing. The calculation results of coolant heating distributions by the fast reactor assembly channels are presented. The analysis of the results obtained shows that interchannel exchange essentially uniforms the coolant heating distribution in the peripheral range of the assembly but it does not remove non-uniformity caused by power distribution non-uniformity in the cross section. Geometry of the peripheral assembly range plays an essential role in the heating distribution. Change of the calculation gap between the peripheral fuel elements and assembly shells can result either in superheating or in subcooling in the peripheral channels relatively to joint internal channels of the assembly. Heat supply to the coolant passing through interassembly gaps decreases temperature in the assembly periphery and results in the increase of temperature non-uniformity by the perimeter of peripheral fuel elements. It is concluded that the applied method of the channel-by-channel calculation is ef-- fective in thermal-physical calculation of nuclear reactor fuel assemblies and it permits to solve a wide range of problems [ru

  12. Safe operation of research reactors and critical assemblies. Code of practice and annexes. 1984 ed

    International Nuclear Information System (INIS)

    1984-01-01

    The safe operation of research reactors and critical assemblies (hereafter termed 'reactors') requires proper design, construction, management and supervision. This Code of Practice deals mainly with management and supervision. The provisions of the Code apply to the whole life of the reactor, including modification, updating and upgrading. The Code may be subject to revision in the light of experience and the state of technology. The Code is aimed at defining minimum requirements for the safe operation of reactors. Emphasis is placed on which safety requirements should be met rather than on specifying how these requirements may be met. The Code also provides guidance and information to persons and authorities responsible for the operation of reactors. The Code recommends that documents dealing with the operation of reactors and including safety analyses be prepared and submitted for review and approval to a regulatory body. Operation would be authorized on the understanding that it would comply with limits and conditions designed to ensure safety. The Code covers a wide range of reactor types, which gives rise to a variety of safety issues. Safety issues applicable to specific reactor types only (e.g. fast reactors) are not necessarily covered in this Code. Some of the recommendations in the Code are not directly applicable to critical assemblies. A recommendation may therefore be interpreted according to the type of reactor concerned. In such cases the words 'adequate' and 'appropriate' are used to mean 'adequate' or 'appropriate' for the type of reactor under consideration.

  13. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1987-01-01

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction [sr

  14. Grapples for manipulating end fittings for nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Jabsen, F.S.

    1982-01-01

    A nuclear fuel assembly includes control rod guide tubes the upper ends of which protrude beyond a spider and are locked in place by means of a cellular lattice seated in grooves in the outer surfaces of the sleeves. A grapple is provided for disengaging the structure comprising lattice, spider, springs and a grill from the end of the fuel assembly to enable these components to be removed in an assembly state and subsequently replaced after inspection and repair. (author)

  15. Damage of fuel assembly premature changing in a power reactor

    International Nuclear Information System (INIS)

    Rudik, A.P.

    1987-01-01

    Material balance, including energy recovery and nuclear fuel flow rate, under conditions of premature FA extraction from power reactor is considered. It is shown that in cases when before and after FA extraction reactor operates not under optimal conditions damage of FA premature changing is proportional to the first degree of fuel incomplete burning. If normal operating conditions of reactor or its operation after FA changing is optimal, the damage is proportional to the square of fuel incomplete burning

  16. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex A - Reactor applications

    International Nuclear Information System (INIS)

    Martinc, R.; Stanic, A.

    1985-01-01

    This document describes reactor operation from 1981 to 1985, including data about short term (shorter than 24 hours) and long term operation interruptions, as well as safety shutdown and reactor applications. During 1982, 1983 until July 1984 reactor was operated at 2 MW power according to the plan. Plan was not fulfilled in 1983 because deposits were noticed again, at the end of 1982, on the surface of fuel elements. Reactor was mainly used for neutron activation purposes and isotope production as source of neutrons for experimental purposes [sr

  17. RA reactor operation and maintenance in 1992, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktoro RA u 1992. Godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-12-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems. [Serbo-Croat] U toku 1992 godine poslovi u okviru projekta 'Istrazivacki nuklearni reaktor RA' obavljani su u skladu sa programom i planom rada. Osnovne aktivnosti na kojima je radjeno odnosile su se na revitalizaciju reaktora RA, kao i na odrzavanje opreme. U ovom periodu reaktor nije bio u pogonu. Svo osoblje je bilo angazovano na poslovima rekonstrukcije i modernizacije postojecih i dogradnje novih reaktorskih sistema, na odrzavanju opreme a deo tehnickog osoblja je bio obucavan za vrsenje odgovarajucih poslova u pogonu i odrzavanju opreme.

  18. Neutron collar calibration for assay of LWR [light-water reactor] fuel assemblies

    International Nuclear Information System (INIS)

    Menlove, H.O.; Pieper, J.E.

    1987-03-01

    The neutron-coincidence collar is used for the verification of the uranium content in light-water reactor fuel assemblies. An AmLi neutron source is used to give an active interrogation of the fuel assembly to measure the 235 U content, and the 238 U content is verified from a passive neutron-coincidence measurement. This report gives the collar calibration data of pressurized-water reactor and boiling-water reactor fuel assemblies. Calibration curves and correction factors are presented for neutron absorbers (burnable poisons) and different fuel assembly sizes. The data were collected at Exxon Nuclear, Franco-Belge de Fabrication de Combustibles, ASEA-Atom, and other nuclear fuel fabrication facilities

  19. RA Reactor operation and maintenance (I-IX), Part I; Pogon i odrzavanje reaktora RA (I-IX), I Deo

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling.

  20. RA Reactor operation and maintenance (I-IX), Part IV, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora RA (I-IX), IV Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume contains reports describing maintenance and repair work of the RA reactor instrumentation, equipment of the reactor dosimetry control system, and equipment for regulation and control systems.

  1. Seismic analysis of fuel and target assemblies at a production reactor

    International Nuclear Information System (INIS)

    Braverman, J.I.; Wang, Y.K.

    1991-01-01

    This paper describes the unique modeling and analysis considerations used to assess the seismic adequacy of the fuel and target assemblies in a production reactor at Savannah River Site. This confirmatory analysis was necessary to provide assurance that the reactor can operate safely during a seismic event and be brought to a safe shutdown condition. The plant which was originally designed in the 1950's required to be assessed to more current seismic criteria. The design of the reactor internals and the magnitude of the structural responses enabled the use of a linear elastic dynamic analysis. A seismic analysis was performed using a finite element model consisting of the fuel and target assemblies, reactor tank, and a portion of the concrete structure supporting the reactor tank. The effects of submergence of the fuel and target assemblies in the water contained within the reactor tank can have a significant effect on their seismic response. Thus, the model included hydrodynamic fluid coupling effects between the assemblies and the reactor tank. Fluid coupling mass terms were based on formulations for solid bodies immersed in incompressible and frictionless fluids. The potential effects of gap conditions were also assessed in this evaluation. 5 refs., 6 figs., 1 tab

  2. CFD analysis of flow distribution of reactor core and temperature rise of coolant in fuel assembly for VVER reactor

    International Nuclear Information System (INIS)

    Du Daiquan; Zeng Xiaokang; Xiong Wanyu; Yang Xiaoqiang

    2015-01-01

    Flow field of VVER-1000 reactor core was investigated by using computational fluid dynamics code CFX, and the temperature rise of coolant in hot assembly was calculated. The results show that the maximum value of flow distribution factor is 1.12 and the minimum value is 0.92. The average value of flow distribution factor in hot assembly is 0.97. The temperature rise in hot assembly is higher than current warning limit value ΔT t under the deviated operation condition. The results can provide reference for setting ΔT t during the operation of nuclear power plant. (authors)

  3. Dose rate in the reactor room and environment during maintenance in fusion reactors

    International Nuclear Information System (INIS)

    Maki, Koichi; Satoh, Satoshi; Takatsu, Hideyuki; Seki, Yasushi

    1995-01-01

    According to the International Thermonuclear Experimental Reactor (ITER) conceptual design activity, after reactor shutdown, damaged segments are pulled up from the reactor and hung from the reactor room ceiling by a remote handling device. The dose rate in the reactor room and the environment is estimated for this situation, and the following results are obtained. First, the dose rate in the room is > 10 8 μSv/h. Since this dose rate is 10 7 times greater than the biological radiation shielding design limit of 25 μSv/h, workers cannot enter the room. Second, lenses and optical fiber composed of glass that is radiation resistant up to 10 6 Gy would be damaged after <100 h near the segment, and devices using semiconductors could not work after several hours or so in the aforementioned dose-rate conditions. Third, during suspension of one blanket segment from the ceiling, the dose rate in the site boundary can be reduced by one order by a 23-cm-thicker reactor building roof. To reduce dose rate in public exposure to a value that is less than one-tenth of the public exposure radiation shielding design limit of 100 μSv/yr, the distance of the site boundary from the reactor must be greater than 200 m for a reactor building with a 160-cm-thick concrete roof. 9 refs., 6 figs., 2 tabs

  4. Preliminary study on the feasibility of ductless fuel assembly for fast reactors

    International Nuclear Information System (INIS)

    Shibahara, Itaru; Enokido, Yuji

    1988-01-01

    Preliminary study on the feasibility of ductless fuel assembly for fast reactors has been conducted. The primary concern is with forecasting the thermal hydraulic characteristics and the heat removal efficiency from the core. The thermal hydraulic analysis revealed the coolant mixing in the core at steady state operating condition was not intensive and the coolant temperature increase was almost proportional to the power of each assembly. The hot spot analysis of the ductless core indicated that the hottest temperature in the core could be comparable with the temperature of the conventional ducted core, even in case the radial power flattening was not actively pursued but with adopting ducted radial blanket assemblies. Under off-normal conditions, the ductless core had improved heat removal capability which was caused by inter-assembly coolant flow. The study has indicated the feasibility of the ductless fuel assembly for fast reactors. The experiments to demonstrate the feasibility will be the next key process for the development. (author)

  5. Data base of reactor physics experimental results in Kyoto University critical assembly experimental facilities

    International Nuclear Information System (INIS)

    Ichihara, Chihiro; Fujine, Shigenori; Hayashi, Masatoshi

    1986-01-01

    The Kyoto University critical assembly experimental facilities belong to the Kyoto University Research Reactor Institute, and are the versatile critical assembly constructed for experimentally studying reactor physics and reactor engineering. The facilities are those for common utilization by universities in whole Japan. During more than ten years since the initial criticality in 1974, various experiments on reactor physics and reactor engineering have been carried out using many experimental facilities such as two solidmoderated cores, a light water-moderated core and a neutron generator. The kinds of the experiment carried out were diverse, and to find out the required data from them is very troublesome, accordingly it has become necessary to make a data base which can be processed by a computer with the data accumulated during the past more than ten years. The outline of the data base, the data base CAEX using personal computers, the data base supported by a large computer and so on are reported. (Kako, I.)

  6. Software design of the hybrid robot machine for ITER vacuum vessel assembly and maintenance

    International Nuclear Information System (INIS)

    Li, Ming; Wu, Huapeng; Handroos, Heikki; Yang, Guangyou

    2013-01-01

    A specific software design is elaborated in this paper for the hybrid robot machine used for the ITER vacuum vessel (VV) assembly and maintenance. In order to provide the multi-machining-function as well as the complicated, flexible and customizable GUI designing satisfying the non-standardized VV assembly process in one hand, and in another hand guarantee the stringent machining precision in the real-time motion control of robot machine, a client–server-control software architecture is proposed, which separates the user interaction, data communication and robot control implementation into different software layers. Correspondingly, three particular application protocols upon the TCP/IP are designed to transmit the data, command and status between the client and the server so as to deal with the abundant data streaming in the software. In order not to be affected by the graphic user interface (GUI) modification process in the future experiment in VV assembly working field, the real-time control system is realized as a stand-alone module in the architecture to guarantee the controlling performance of the robot machine. After completing the software development, a milling operation is tested on the robot machine, and the result demonstrates that both the specific GUI operability and the real-time motion control performance could be guaranteed adequately in the software design

  7. Software design of the hybrid robot machine for ITER vacuum vessel assembly and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Li, Ming, E-mail: Ming.Li@lut.fi [Laboratory of Intelligent Machines, Lappeenranta University of Technology (Finland); Wu, Huapeng; Handroos, Heikki [Laboratory of Intelligent Machines, Lappeenranta University of Technology (Finland); Yang, Guangyou [School of Mechanical Engineering, Hubei University of Technology, Wuhan (China)

    2013-10-15

    A specific software design is elaborated in this paper for the hybrid robot machine used for the ITER vacuum vessel (VV) assembly and maintenance. In order to provide the multi-machining-function as well as the complicated, flexible and customizable GUI designing satisfying the non-standardized VV assembly process in one hand, and in another hand guarantee the stringent machining precision in the real-time motion control of robot machine, a client–server-control software architecture is proposed, which separates the user interaction, data communication and robot control implementation into different software layers. Correspondingly, three particular application protocols upon the TCP/IP are designed to transmit the data, command and status between the client and the server so as to deal with the abundant data streaming in the software. In order not to be affected by the graphic user interface (GUI) modification process in the future experiment in VV assembly working field, the real-time control system is realized as a stand-alone module in the architecture to guarantee the controlling performance of the robot machine. After completing the software development, a milling operation is tested on the robot machine, and the result demonstrates that both the specific GUI operability and the real-time motion control performance could be guaranteed adequately in the software design.

  8. Expert system for maintenance management of a boiling water reactor power plant

    International Nuclear Information System (INIS)

    Hong Shen; Liou, L.W.; Levine, S.; Ray, A.; Detamore, M.

    1992-01-01

    An expert system code has been developed for the maintenance of two boiling water reactor units in Berwick, Pennsylvania, that are operated by the Pennsylvania Power and Light Company (PP and L). The objective of this expert system code, where the knowledge of experienced operators and engineers is captured and implemented, is to support the decisions regarding which components can be safely and reliably removed from service for maintenance. It can also serve as a query-answering facility for checking the plant system status and for training purposes. The operating and maintenance information of a large number of support systems, which must be available for emergencies and/or in the event of an accident, is stored in the data base of the code. It identifies the relevant technical specifications and management rules for shutting down any one of the systems or removing a component from service to support maintenance. Because of the complexity and time needed to incorporate a large number of systems and their components, the first phase of the expert system develops a prototype code, which includes only the reactor core isolation coolant system, the high-pressure core injection system, the instrument air system, the service water system, and the plant electrical system. The next phase is scheduled to expand the code to include all other systems. This paper summarizes the prototype code and the design concept of the complete expert system code for maintenance management of all plant systems and components

  9. Packaging and transport case of test fuel assembly irradiated in the Creys-Malville reactor

    International Nuclear Information System (INIS)

    Geffroy, J.; Vivien, J.; Pouard, M.; Dujardin, G.N.; Veron, B.; Michoux, H.

    1986-06-01

    Some irradiated fuel assemblies from the fast neutron Creys Malville reactor will be sent to hot laboratories to follow fuel behavior. These test assemblies will be examined after a limited cooling time and transport is realized at high residual power (about 10kW) and cladding temperature should not rise over 500deg C. The fuel assemblies are not dismantled and transported into sodium. The assembly is placed into a case containing sodium plugged and put into a packaging. Dimensioning, thermal behavior, radiation protection and containment are examined [fr

  10. Study on human-factors-engineering properties of reactor maintenance workers with protection suits, (2). Basic research on various biological characteristics in reactor maintenance simulation tests

    Energy Technology Data Exchange (ETDEWEB)

    Yoshino, K; Ishii, K; Nakasa, H [Central Research Inst. of Electric Power Industry, Tokyo (Japan); Shigeta, S

    1980-11-01

    To ensure the safety of reactor maintenance workers and to reduce the radiation exposure through the enhancement of labor efficiency, it is needed to evaluate quantitatively work-stress levels of workers with radiation-protection suits. This paper presents the results of reactor-maintenance simulation tests in which the relationship between the work stress and biological characteristics is investigated for 5 pinds of model works done by testees without protection suits in an artificial climate chamber. Major results obtained are: (1) the selected model works are mostly evaluated to be relatively heavy through the measurement of RMR (Relative Metabolic Rate). (2) biological characteristics such as heart rate and respiratory volume under the model works have close relationship to RMR which is the cumulative quantity in relatively long time, and then they may become the real-time indicator for the work stress level. (3) such biological characteristics are greatly affected by the high-temperature work-environment which is often seen in workers with protection suits.

  11. Effect of fuel assembly when changing from AFA 2G to AFA 3G on seismic loads of reactor internal

    International Nuclear Information System (INIS)

    Liu Wenjin; Zeng Zhongxiu; Ye Xianhui; Wu Wanjun

    2013-01-01

    Nonlinear seismic model for reactor with fuel assemblies of AFA 2G and AFA 3G is established. Using ANSYS software, seismic nonlinear time -history analysis is completed and the effects on seismic loads of reactor system are obtained. The result shows that when the fuel assembly changing from AFA 2G to AFA 3G, it is necessary to reevaluate the fuel assembly itself, but not the reactor internal. (authors)

  12. Inspection and repair apparatus for a nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Shallenberger, J.M.; Hornak, L.P.; Desmarchais, W.E.

    1975-01-01

    An apparatus is disclosed for inspecting and repairing a radioactive fuel assembly. The radioactive fuel assembly is positioned within a shielding sleeve which substantially reduces the level of radioactivity immediately surrounding the sleeve thereby permitting direct access by operating personnel. In one embodiment, a rotatable collar is mounted to the sleeve at a midlength location. An access port, an inspection port and an instrument port are included with the collar so that operating personnel may directly inspect the fuel assembly and effectuate any necessary repairs

  13. Fabrication of nuclear ship reactor MRX model and study on inspection and maintenance of components

    International Nuclear Information System (INIS)

    Kasahara, Yoshiyuki; Nakazawa, Toshio; Kusunoki, Tsuyoshi; Takahashi, Hiroki; Yoritsune, Tsutomu.

    1997-10-01

    The MRX (Marine Reactor X) is an integral type small reactor adopting passive safety systems. As for an integral type reactor, primary system components are installed in the reactor vessel. It is therefor important to establish the appropriate procedure for construction, inspection and maintenance, dismauntling, etc., for all components in the reactor vessel as well as in the reactor containment, because inspection space is limited. To study these subjects, a one-fifth model of the MRX was fabricated and operation capabilities were studied. As a result of studies, the following results are obtained. (1) Manufacturing and installing problems of the reactor pressure vessel, the containment vessel and internal components are basically not abserved. (2) Heat transfer tube structures of the steam generator and the heat exchangers of emergency decay heat removal system and containment water cooler were not seen of any problem for fabrication. However, due consideration is required in the detailed design of supports of heat transfer tubes. (3) Further studies should be needed for designs of flange penetrations and leak countermeasures for pipes instrument cables. (4) Arrangements of equipments in the containment should be taken in consideration in detail because the space is narrow. (5) Further discussion is required for installation methods of instruments and cables. (author)

  14. Maintenance of Structures, Systems and Components of the RSG-GAS Reactor as an Implementation of BAPETEN Regulation No. 5 Year 2011

    International Nuclear Information System (INIS)

    Aep Saepudin Catur; Dede Solehudin Fauzi; Djunaidi

    2012-01-01

    Maintenance activities for structures, systems and components of the reactor, consider prerequisites for the operation of the non power reactor. This activity is intended to ensure that the structures, systems and components function properly. Implementation of reactor maintenance carried out starting from programs establishment, scheduling, maintenance accomplishment and maintenance report. This paper will describe the implementation of reactor maintenance non power as required by BAPETEN regulation no.5, year 2011. By understanding correctly of this regulation, it is expected that maintenance activity of structures, systems and components of the reactor can be successfully performed. The RSG-GAS reactor has implemented various types of reactor maintenance based on BAPETEN regulation no.5 year 2011 properly. As a result failure of the structures, systems and components of the reactor can be minimized then they can be kept reliable. (author)

  15. Nuclear reactor fuel assemblies and end fitting grid structures therefor

    International Nuclear Information System (INIS)

    Jabsen, F.S.

    1978-01-01

    An improved end fitting grid structure is described for nuclear fuel assemblies which overcomes the need for load-bearing control rod guide tubes and the expensive special fittings that these tubes required. (UK)

  16. Mobile robotics for CANDU reactor maintenance: case studies and near-term improvements

    International Nuclear Information System (INIS)

    Lipsett, M. G.; Rody, K.H.

    1995-01-01

    Although robotics researchers have been promising that robotics would soon be performing tasks in hazardous environments, the reality has yet to live up to the hype. The presently available crop of robots suitable for deployment in industrial situations are remotely operated, requiring skilled users. This talk describes cases where mobile robots have been used successfully in CANDU stations, discusses the difficulties in using mobile robots for reactor maintenance, and provides near-term goals for achievable improvements in performance and usefulness. (author)

  17. Design and construction of demineralized water production and maintenance system for RA-O nuclear reactor

    International Nuclear Information System (INIS)

    Rumis, D.; Martin, H.R.

    1990-01-01

    The normal operation of zero power RA-O Nuclear Reactor requires a production and maintenance of demineralized water system. This system was designed and built-up during the works for actualization, upgrading and new start up at Cordoba National University of this facility. This paper comments the relevant aspects about the didactical purpose of that system and the details considered for training and practices with it. Similarly, considerations about solids wastes and effluents treatment are discussed. (Author)

  18. Organization and mechanization of maintenance operations at NPPs with the WWER type reactors

    International Nuclear Information System (INIS)

    Titov, A.A.

    1983-01-01

    The structure of capital investments defining organization and mechanization of maintepance operations at NPPs with the WWER type reactors is analyzed. The trends in development of optimum decisions for organization and mechanization of repair obs at NPPs being designed taking into account the prospects of nuclear powep enginerning development, the system of NPP maintenance servicing, as well as the structure of repair-productive capacities are discussed. On the basis of the analysis of the data obtained in designing the Zaporozhskaya NPP it is shown that the capital investments for organizing and mechanization of maintenance operations at the unified NPP site with four WWER-1000 reactors reach nearly 18 roubles/kW. A conclusion is drawn that at present the design of an NPP with the WWER-1000 reactor totally meets the requirements of realization of periodic maintenance operations. It is advisable to cooperate the NPP management with that of a thermal power station from the viewpoint of using manpower, which would improve the operating conditions and labour productivity of workers engaged in repair and, consequently, reduce the capital investments and repair expenditures

  19. A decision support system for maintenance management of a boiling-water reactor power plant

    International Nuclear Information System (INIS)

    Shen, J.H.; Ray, A.; Levin, S.

    1996-01-01

    This article reports the concept and development of a prototype expert system to serve as a decision support tool for maintenance of boiling-water reactor (BWR) nuclear power plants. The code of the expert system makes use of the database derived from the two BWR units operated by the Pennsylvania Power and Light Company in Berwick, Pennsylvania. The operations and maintenance information from a large number of plant equipment and sub-systems that must be available for emergency conditions and in the event of an accident is stored in the database of the expert system. The ultimate goal of this decision support tool is to identify the relevant Technical Specifications and management rules for shutting down any one of the plant sub-systems or removing a component from service to support maintenance. 6 refs., 7 figs

  20. An improved water cooled nuclear reactor and pressuriser assembly

    International Nuclear Information System (INIS)

    Gardner, F.J.; Strong, R.

    1991-01-01

    A water cooled nuclear reactor is described which comprises a reactor core, a primary water coolant circuit and a pressuriser arranged as an integral unit in a pressure vessel. The pressure vessel is divided into an upper and a lower chamber by a casing. The reactor core and primary water coolant circuit are arranged in the lower chamber and the pressuriser is arranged in the upper chamber. A plurality of spray pipes interconnect a steam space of the pressuriser with the downcomer of the primary water coolant circuit below a heat exchanger. A plurality of surge ports interconnect a water space of the pressuriser with the primary water coolant circuit. The surge ports have hydraulic diodes so that there is a low flow resistance for water from the water space of the pressuriser to the primary water coolant circuit and high flow resistance in the opposite direction. The spray pipes provide a desuperheating spray of cooled water into the pressuriser during positive volume surges of the primary water coolant. The pressuriser arrangement may also be applied to integral water cooled reactors with separate pressurisers and to dispersed pressurised water reactors. The surge ports also allow water to flow by gravity to the core in an emergency. (author)

  1. Experimental determination of the neutron source for the Argonauta reactor subcritical assembly

    Energy Technology Data Exchange (ETDEWEB)

    Renke, Carlos A.C.; Furieri, Rosanne C.A.A.; Pereira, Joao C.S.; Voi, Dante L.; Barbosa, Andre L.N., E-mail: renke@ien.gov.b [Instituto de Engenharia Nuclear (IEN/CNEN-RJ), Rio de Janeiro, RJ (Brazil)

    2011-07-01

    The utilization of a subcritical assembly for the determination of nuclear parameters in a multiplier medium requires a well defined neutron source to carry out the experiments necessary for the acquisition of the desired data. The Argonauta research reactor installed at the Instituto de Engenharia Nuclear has a subcritical assembly, under development, to be coupled at the upper part of the reactor core that will provide the needed neutrons emerging from its internal thermal column made of graphite. In order to perform neutronic calculations to compare with the experimental results, it is necessary a precise knowledge of the emergent neutron flux that will be used as neutron source in the subcritical assembly. In this work, we present the thermal neutron flux profile determined experimentally via the technique of neutron activation analysis, using dysprosium wires uniformly distributed at the top of the internal thermal neutron column of the Argonauta reactor and later submitted to a detection system using Geiger-Mueller detector. These experimental data were then compared with those obtained through neutronic calculation using HAMMER and CITATION codes in order to validate this calculation system and to define a correct neutron source distribution to be used in the subcritical assembly. This procedure avoids a coupled neutronic calculation of the subcritical assembly and the reactor core. It has also been determined the dimension of the graphite pedestal to be used in the bottom of the subcritical assembly tank in order to smooth the emergent neutron flux at the reactor top. Finally, it is estimated the thermal neutron flux inside the assembly tank when filled with water. (author)

  2. Safety considerations of new critical assembly for the Research Reactor Institute, Kyoto University

    International Nuclear Information System (INIS)

    Umeda, Iwao; Matsuoka, Naomi; Harada, Yoshihiko; Miyamoto, Keiji; Kanazawa, Takashi

    1975-01-01

    The new critical assembly type of nuclear reactor having three cores for the first time in the world was completed successfully at the Research Reactor Institute of Kyoto University in autumn of 1974. It is called KUCA (Kyoto University Critical Assembly). Safety of the critical assembly was considered sufficiently in consequence of discussions between the researchers of the institute and the design group of our company, and then many bright ideas were created through the discussions. This paper is described the new safety design of main equipments - oil pressure type center core drive mechanism, removable water overflow mechanism, core division mechanism, control rod drive mechansim, protection instrumentation system and interlock key system - for the critical assembly. (author)

  3. Spatial kinetics studies in liquid-metal fast breeder reactor critical assemblies

    International Nuclear Information System (INIS)

    Brumback, S.B.; Goin, R.W.; Carpenter, S.G.

    1988-01-01

    Recent measurements in the zero-power physics reactor have been used to study the effect of spatial decoupling in fast reactor critical assemblies of various sizes and compositions. Flux distributions in these assemblies had varying degrees of sensitivity to perturbations. Decoupling was investigated using rod-drop, boron-oscillator, and noise-coherence techniques, which emphasized different times following perturbations. Equilibrium flux distributions were also measured for subcritical configurations with inserted control rods. For most assemblies, accurate reactivity measurements were obtained by analyzing the power history from a single detector using inverse kinetics methods, assuming an instantaneous efficiency change for the detector. The instantaneous efficiency change assumption broke down, however, in assemblies with zones in which normal plutonium fuel was replaced by /sup 235/U fuel or fuel with a high /sup 240/Pu content. Flux redistributions caused by perturbations in these cores took several minutes to evolve

  4. Reactor physics studies in the GCFR phase-II critical assembly

    International Nuclear Information System (INIS)

    Pond, R.B.

    1976-09-01

    The reactor physics studies performed in the gas cooled fast reactor (GCFR) mockup on ZPR-9 are covered. This critical assembly, designated Phase II in the GCFR program, had a single zone PuO 2 -UO 2 core composition and UO 2 radial and axial blankets. The assembly was built both with and without radial and axial stainless steel reflectors. The program included the following measurements: small-sample reactivity worths of reactor constituent materials (including helium); 238 U Doppler effect; uranium and plutonium reaction rate distributions; thorium, uranium, and plutonium α and reactor kinetics. Analysis of the measurements used ENDF/B-IV nuclear data; anisotropic diffusion coefficients were used to account for neutron streaming effects. Comparison of measurements and calculations to GCFR Phase I are also made

  5. Calibration assembly for nuclear reactor vessel inspection apparatus

    International Nuclear Information System (INIS)

    Elsner, H.J.

    1981-01-01

    A removable calibration assembly can be utilized to verify the angular mounting of transducers in an array employed in an ultrasonic inpsection apparatus, to calibrate one axis of movement of the array with reference to a starting point, or to measure and calibrate the speed per unit of distance of the transducer's ultrasonic beam in the operating medium. The calibration assembly includes both a large and small reflecting surface separated by known distances, and several large cones, the tips of which are machined or adjusted to angles at which certain of the transducers are to be mounted. Clamping means for securing the calibration assembly to the inspection apparatus at a predetermined orientation is provided

  6. Study on radioactive waste management scenarios in regular maintenance of a fusion reactor

    International Nuclear Information System (INIS)

    Someya, Youji; Tobita, Kenji; Yanagihara, Satoshi

    2015-01-01

    Low-level radioactive waste is generated in large amounts in the operation of a fusion reactor. For this reason, there are needs for the study of radioactive waste management scenarios, as well as the clarification of the function of waste handling facilities in the design phase. This paper describes the management scenarios with a focus on the radioactive waste generated at the time of scheduled maintenance of a nuclear fusion prototype reactor. Based on the temporal change of the residual heat and dose rate of the blanket and diverter, as the furnace equipment associated with induced radioactivity, management period was determined. At this time, the attenuation rate of dose rate and the like of each device are different. So, if maintenance cycle is established for each device and thus storage area is minimized, the control area can be optimized. Based on the 'principle for minimizing radioactive waste,' the reuse of devices is effective in reducing waste. So, in view of a commercial reactor, research and development is required for the establishment of reuse process under high-dose. Since the commitment to radioactive waste is considered to be an important factor in the future for the social acceptance of nuclear fusion reactor development, comprehensive study including the disposal of waste and the reuse of equipment is important. (A.O.)

  7. Analysis of assembly serial number usage in domestic light-water reactors

    International Nuclear Information System (INIS)

    Reich, W.J.; Moore, R.S.

    1991-05-01

    Domestic light-water reactor (LWR) fuel assemblies are identified by a serial number that is placed on each assembly. These serial numbers are used as identifiers throughout the life of the fuel. The uniqueness of assembly serial numbers is important in determining their effectiveness as unambiguous identifiers. The purpose of this study is to determine what serial numbering schemes are used, the effectiveness of these schemes, and to quantify how many duplicate serial numbers occur on domestic LWR fuel assemblies. The serial numbering scheme adopted by the American National Standards Institute (ANSI) ensures uniqueness of assembly serial numbers. The latest numbering scheme adopted by General Electric (GE), was also found to be unique. Analysis of 70,971 fuel assembly serial numbers from permanently discharged fuel identified 11,948 serial number duplicates. Three duplicate serial numbers were found when analysis focused on duplication within the individual fuel inventory at each reactor site, but these were traced back to data entry errors and will be corrected by the Energy Information Administration (EIA). There were also three instances where the serial numbers used to identify assemblies used for hot cell studies differed from the serial numbers reported to the EIA. It is recommended that fuel fabricators and utilities adhere to the ANSI serial numbering scheme to ensure serial number uniqueness. In addition, organizations collecting serial number information, should request that all known serial numbers physically attached or associated with each assembly be reported and identified by the corresponding number scheme. 10 refs., 5 tabs

  8. The Expert System For Safety Assesment Of Kartini Reactor Operation And Maintenance

    International Nuclear Information System (INIS)

    Syarip

    2000-01-01

    An expert system for safety assessment of Kartini reactor operation and maintenance based on fuzzy logic method has been made. The expert system is developed from the Fuzzy Expert System Tools (FEST), i.e. by developing the knowledge base and data base files of Kartini research reactor system and operations with an inference engine based on FEST. The knowledge base is represented in the procedural knowledge as heuristic rules or generally known as rule-base in the from of If-then rule. The fuzzy inference process and the conclusion of the rule is done by FEST based on direct chaining method with interactive as well as non-interactive modes. The safety assessment of Kartini reactor based on this method gives more realistic value than the conventional method or binary logic

  9. Operating experience and maintenance at the TRIGA Mark II LENA reactor

    International Nuclear Information System (INIS)

    Cingoli, F.; Meloni, S.; Alloni, L.

    1986-01-01

    A summary of reactor operation and maintenance in the time period 1982-1986 is presented and discussed. Some problems occurred from instrumentated aluminum cladded elements. Both of them presented damage in the cable tubes and one element showed a protuberance in the cladding. They were replaced with stainless - steel cladded ones. Both elements were sealed up in stainless - steel tubes and put away in wells, 3 meters deep, in the reactor room floor. Some minor problems, correlated to the quite aid instrumentation of the console, are reported. The reactor activity in the last four years was conditioned by the developing of the n - n-bar oscillation NADIR experiment. The thermal column was dismantled and rebuilt in consideration of the Nadir experiment necessities and this job is described in detail. The building containing, the target and the void pipe, presented in 1982 Conference, are now completely operating and the experiment is running. (author)

  10. Radiation shielding considerations for the repair and maintenance of a swimming pool-type tokamak reactor

    International Nuclear Information System (INIS)

    Seki, Y.; Mori, S.

    1984-01-01

    The radiation shielding relevant to the repair and maintenance of a swimming pool-type tokamak reactor is considered. The dose rate during the reactor operation can be made low enough for personnel access into the reactor room if a 2m thick water layer is installed above the magnet cryostat. The dose rate 24 h after shutdown is such that the human access is allowed above the magnet cryostat. Sufficient water layer thickness is provided in the inboard space for the operation of automatic welder/cutter while retaining the magnet shielding capability. Some forced cooling is required for the decay heat removal in the first wall. The penetration shield thickness around the neutral beam injector port is estimated to be barely sufficient in terms of the magnet radiation damage. (orig.)

  11. Transient bowing of core assemblies in advanced liquid metal fast reactors

    International Nuclear Information System (INIS)

    Kamal, S.A.; Orechwa, Y.

    1986-01-01

    Two alternative core restraint concepts are considered for a conceptual design of a 900 MWth liquid metal fast reactor core with a heterogeneous layout. The two concepts, known as limited free bowing and free flowering, are evaluated based on core bowing criteria that emphasize the enhancement of inherent reactor safety. The core reactivity change during a postulated loss of flow transient is calculated in terms of the lateral displacements and displacement-reactivity-worths of the individual assemblies. The NUBOW-3D computer code is utilized to determine the assembly deformations and interassembly forces that arise when the assemblies are subjected to temperature gradients and irradiation induced creep and swelling during the reactor operation. The assembly ducts are made of the ferritic steel HT-9 and remain in the reactor core for four-years at full power condition. Whereas both restraint systems meet the bowing criteria, a properly designed limited free bowing system appears to be more advantageous than a free flowering system from the point of view of enhancing the reactor inherent safety

  12. Device for handling fuel assemblies within a nuclear reactor core

    International Nuclear Information System (INIS)

    Dupuy, G.

    1975-01-01

    A device is described which comprises two arms having synchronized movements, the tubular portions of the two arms being rigidly fixed to each other by means of a sliding connection and capable of being endowed by means of a differential drive system with movements for producing the same effort but applied in the opposite direction in order that the lateral reaction on the grab of the first arm on a fuel assembly should be equal and opposite to the lateral reaction of the cylindrical guide tube of the second arm on the same fuel assembly

  13. Description and performance characteristics for the neutron Coincidence Collar for the verification of reactor fuel assemblies

    International Nuclear Information System (INIS)

    Menlove, H.O.

    1981-08-01

    An active neutron interrogation method has been developed for the measurement of 235 U content in fresh fuel assemblies. The neutron Coincidence Collar uses neutron interrogation with an AmLi neutron source and coincidence counting the induced fission reaction neutrons from the 235 U. This manual describes the system components, operation, and performance characteristics. Applications of the Coincidence Collar to PWR and BWR types of reactor fuel assemblies are described

  14. Measurement and analysis on dynamic behaviour of parallel-plate assembly in nuclear reactors

    International Nuclear Information System (INIS)

    Chen Junjie; Guo Changqing; Zou Changchuan

    1997-01-01

    Measurement and analysis on dynamic behaviour of parallel-plate assembly in nuclear reactors have been explored. The electromagnetic method, a new method of measuring and analysing dynamic behaviour with the parallel-plate assembly as the structure of multi-parallel-beams joining with single-beam, has been presented. Theoretical analysis and computation results of dry-modal natural frequencies show good agreement with experimental measurements

  15. Transfer hook for nuclear fuel assemblies and nuclear reactor having a such hook

    International Nuclear Information System (INIS)

    Thevenot, L.P.

    1990-01-01

    For removing irradiated nuclear fuel assemblies above the level of the liquid metal in the vessel without loss of cooling, the hook mechanism has a guide tube with two annular cavities and a pump to circulate the reactor cooling fluid which flows out by gravity. A such hook used in a LMFBR reduces the height of the reactor vessel and consequently the initial capital cost [fr

  16. Sensitivity coefficients of reactor parameters in fast critical assemblies and uncertainty analysis

    International Nuclear Information System (INIS)

    Aoyama, Takafumi; Suzuki, Takayuki; Takeda, Toshikazu; Hasegawa, Akira; Kikuchi, Yasuyuki.

    1986-02-01

    Sensitivity coefficients of reactor parameters in several fast critical assemblies to various cross sections were calculated in 16 group by means of SAGEP code based on the generalized perturbation theory. The sensitivity coefficients were tabulated and the difference of sensitivity coefficients was discussed. Furthermore, the uncertainty of calculated reactor parameters due to cross section uncertainty were estimated using the sensitivity coefficients and cross section covariance data. (author)

  17. Study of the neutronic behavior of a fuel assembly with gadolinium of a reactor HPLWR

    International Nuclear Information System (INIS)

    Barragan M, A.; Martin del Campo M, C.; Francois L, J. L.; Espinosa P, G.

    2012-10-01

    This work presents a neutronic study of a square assembly design of double line of fuel rods, with moderator box to center of the arrangement, for the nuclear reactor cooled with supercritical water, High Performance Light Water Reactor (HPLWR). For the fuel analyses of the reactor HPLWR the neutronic code Helios-2 was used, settling down as the first study on fuel under conditions of supercritical water that has been simulated with this code. The analyzed variables, essentials in the neutronic design of any reactor, were the infinite neutrons multiplication factor (k∞) and the maximum power peaking factor (PPF max ), as well as the reactivity coefficients by the fuel temperature. The k∞ and PPF max values were obtained under conditions in cold (293.6 K) and in hot (to 880.8 K). The tests were realized for a reference fuel assembly design, with 40 fuel rods with enrichments of 4 and 5% of U-235, and considering different concentrations of consumable poison (gadolinium - Gd 2O3 ) in some rods of the same assembly. The obtained results show values k∞ and PPF max minors to the present in the conventional light water reactors. Moreover, the reactivity coefficients by fuel temperature were verified with the purpose of satisfying the safety conditions required in the nuclear reactors. (Author)

  18. Nuclear sub-assembly for liquid metal fast breeder reactor

    International Nuclear Information System (INIS)

    1978-01-01

    The description is given of a nuclear sub-assembly comprising several spaced out fuel pins in a tubular shroud, the characteristic being that the section of the shroud forms a closed figure with six main straight sides in hexagonal shape, the main sides being joined by subsidiary sides which are either straight or convex towards the centre of the figure [fr

  19. Activity of the Service for maintenance of the electronic equipment of the RA reactor in 1976, report - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1976-01-01

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system [sr

  20. Combined fuel assembly and thimble plug gripper for a nuclear reactor

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Satterlee, A.E.

    1978-01-01

    A combined fuel assembly and thimble plug gripper for raising and lowering a fuel assembly into a nuclear reactor core, and for lifting and lowering a thimble plug assembly into the fuel assembly is described. It includes a vertically movable mast housing a mechanism which causes pivotally mounted fingers on the bottom of the mast to be moved into and out of latching engagement with the nozzle of a fuel assembly when the mast is resting on the assembly. The mast includes a second mechanism which supports second fingers pivotally mounted thereon and actuable by a third mechanism into and out of engagement with a thimble plug assembly supporting plugs adapted to be inserted in control rod guide thimbles in the fuel assembly. The second mechanism further includes an arrangement for lowering or raising the plug assembly respectively into or out of the guide thimbles in the fuel assembly. The apparatus includes control and interlock systems which preclude operation of the mechanisms under certain prescribed conditions

  1. Nondestructive determination of burnup and fissile isotope balance in spent fuel assemblies of water cooled reactors

    International Nuclear Information System (INIS)

    Pinel, J.

    1983-03-01

    Two non-destructive methods for measuring fuel assemblies in storage pools have been developed: a gamma fuel scanning method, using the 134 Cs - 137 Cs and 144 Ce gamma rays, and the measurement of the neutron flux emitted by the fuel assembly. For interpreting the measurement, we have used calculated correlations to establish a connection between the measured phenomena and the parameters to be determined. A measurement campaign involving 58 assemblies from the C.N.A. reactor was conducted in the reprocessing plant of LA HAGUE. The results obtained show that the objectives can be achevied within an industrial environment [fr

  2. Neutron metrology in the fuel assemblies of a material test reactor

    International Nuclear Information System (INIS)

    Voorbraak, W.P.; Paardekoper, A.; Polle, A.N.; Freudenreich, W.E.

    1993-08-01

    Results are presented of detailed thermal and fast neutron measurements performed in all fuel and control assemblies of the HFR in Petten. The results give information about deviations of a general shape of vertical thermal and fast fluence rate distributions due to material transitions in the reactor core and different control assembly settings. Further it is demonstrated that the ratio of fast and thermal fluence rate at the various monitor positions in the assemblies give useful information for the (relative) local burn-up of the fuel. (orig.)

  3. Numerical verification of the theory of coupled reactors for a deuterium critical assembly using MCNP5

    International Nuclear Information System (INIS)

    Hussein, M.S.; Bonin, H.W.; Lewis, B.J.

    2013-01-01

    The theory of multipoint coupled reactors developed by multi-group transport is verified by using the probabilistic transport code MCNP5. The verification was performed by calculating the multiplication factors (or criticality factors) and coupling coefficients for a two-region test reactor known as Deuterium Critical Assembly, (DCA). The variations of the criticality factors and the coupling coefficients were investigated by changing of the water levels in the inner and outer cores. The numerical results of the model developed with MCNP5 code were validated and verified against published results and the mathematical model based on coupled reactor theory. (author)

  4. Numerical verification of the theory of coupled reactors for a deuterium critical assembly using MCNP5

    Energy Technology Data Exchange (ETDEWEB)

    Hussein, M.S.; Bonin, H.W.; Lewis, B.J., E-mail: mohamed.hussein@rmc.ca, E-mail: bonin-h@rmc.ca, E-mail: lewis-b@rmc.ca [Royal Military College of Canada, Dept. of Chemistry and Chemical Engineering, Kingston, Ontario (Canada)

    2013-07-01

    The theory of multipoint coupled reactors developed by multi-group transport is verified by using the probabilistic transport code MCNP5. The verification was performed by calculating the multiplication factors (or criticality factors) and coupling coefficients for a two-region test reactor known as Deuterium Critical Assembly, (DCA). The variations of the criticality factors and the coupling coefficients were investigated by changing of the water levels in the inner and outer cores. The numerical results of the model developed with MCNP5 code were validated and verified against published results and the mathematical model based on coupled reactor theory. (author)

  5. Educational use of research reactor (KUR) and critical assembly (KUCA) at Kyoto University

    International Nuclear Information System (INIS)

    Misawa, Tsuyoshi; Unesaki, Hironobu; Ichihara, Chihiro; Pyeon, Cheol Ho; Shiroya, Seiji

    2005-01-01

    At Kyoto University Research Reactor Institute, a research reactor of 5MW (KUR) and a critical assembly (KUCA) have been used for educational purpose to train undergraduate or graduate students. Using KUR, basic experiments for neutron applications have been carried out, and KUCA has been used for the education of nuclear engineering and technology. Especially, using KUCA, a joint reactor laboratory course of graduate level is offered every summer since 1975 by nine associated Japanese universities, and more than 2200 students attended this course

  6. Buckling resistance calculation of Guide Thimbles for the mechanical design of fuel assembly type PWR under normal reactor operating conditions

    International Nuclear Information System (INIS)

    Cruz, C.B.L.

    1990-01-01

    The calculations demonstrate the fulfillment of one of the mechanical design criteria for the Fuel Assembly Structure under normal reactor operating conditions. The calculations of stresses in the Guide Thimbles are performed with the aid of the program ANSYS. This paper contains program parameters and modelling of a typical Fuel Assembly for a Reactor similar to ANGRA II. (author)

  7. Nuclear reactor fuel assembly with a removably top nozzle

    International Nuclear Information System (INIS)

    Shallenberger, J.M.; Ferlan, S.J.

    1985-01-01

    The invention relates to a nuclear fuel assembly having an improved attaching structure for removably mounting the top nozzle of the fuel assembly on the upper end of a control-rod guide thimble. The attaching structure comprises an outer socket defined in a portion of the top nozzle, an inner socket extending from the upper end of the guide thimble and removably received in the outer socket for interlocking engagement therewith, and an elongate locking member adapted to be inserted into the inner socket to maintain said interlocking engagement. Removal of the locking member from the inner socket enables the latter to be withdrawn from the outer socket, thereby enabling the top nozzle to be removed from the guide thimble

  8. Irradiation Testing Vehicles for Fast Reactors from Open Test Assemblies to Closed Loops

    Energy Technology Data Exchange (ETDEWEB)

    Sienicki, James J. [Argonne National Lab. (ANL), Argonne, IL (United States); Grandy, Christopher [Argonne National Lab. (ANL), Argonne, IL (United States)

    2016-12-15

    A review of irradiation testing vehicle approaches and designs that have been incorporated into past Sodium-Cooled Fast Reactors (SFRs) or envisioned for incorporation has been carried out. The objective is to understand the essential features of the approaches and designs so that they can inform test vehicle designs for a future U.S. Fast Test Reactor. Fast test reactor designs examined include EBR-II, FFTF, JOYO, BOR-60, PHÉNIX, JHR, and MBIR. Previous designers exhibited great ingenuity in overcoming design and operational challenges especially when the original reactor plant’s mission changed to an irradiation testing mission as in the EBRII reactor plant. The various irradiation testing vehicles can be categorized as: Uninstrumented open assemblies that fit into core locations; Instrumented open test assemblies that fit into special core locations; Self-contained closed loops; and External closed loops. A special emphasis is devoted to closed loops as they are regarded as a very desirable feature of a future U.S. Fast Test Reactor. Closed loops are an important technology for irradiation of fuels and materials in separate controlled environments. The impact of closed loops on the design of fast reactors is also discussed in this report.

  9. Fuel assembly for light-water cooled nuclear reactors

    International Nuclear Information System (INIS)

    Leroux, J.C.; Burfin, P.

    1995-01-01

    In order to make easier the replacement of damaged fuel rods, a fuel assembly has been designed with a cluster of parallel fuel rods maintained in guide tubes with braces and sockets fixed on each tube ends; at least one of the fixing sockets of each tube is dismountable as well as an adapter plate on the socket, in order to lock or un-lock the guide tubes from the sockets. 11 fig

  10. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1983

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Raickovic, N.; Radivojevic, J.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1983-12-01

    After regular shutdown in November 1982, inspection of the fuel elements from the RA reactor core which was done from December 1982 - February 1983 has shown that there are deposits of aluminium oxides on the surface of the fuel cladding. After restart The RA reactor was operated at power levels from 1.8 - 2 MW, with 80% enriched uranium dioxide fuel elements. It was found that there was no corrosion of the fuel element cladding and that it was not possible to find the cause of surface deposition on the cladding surfaces without further operation. It was decided to purify the heavy water permanently during operation and to increase the heavy water flow by operating two pumps. This procedure was adopted in order to decrease the possibility of corrosion. The Safety committee of the Institute has approved this procedure for operating the RA reactor in 1983. The core was made of 80% enriched fuel, critical experiments were done until June 1983, and after that the operation was continued at power levels up to 2 MW [sr

  11. Testing plutonium fuel assembly production for fast-neutron reactors

    International Nuclear Information System (INIS)

    Nougues, B.; Benhamou, A.; Bertothy, G.; Lepetit, H.

    1975-01-01

    The main characteristics of plutonium fuel elements for fast breeder reactors justify specific test procedures and special techniques. The specific tests relating to the Pu content consist of Pu enrichment and distribution tests, determination of the O/M ratio and external contamination tests. The specific tests performed on fuel configuration are: testing of sintered pellet diameter, testing of pin welding and checking of internal assmbly [fr

  12. Transient Analysis of a Gas-cooled Fast Reactor for Single Control Assembly Withdrawal

    International Nuclear Information System (INIS)

    Choi, Hangbok

    2014-01-01

    The Energy Multiplier Module (EMZ) system response has been evaluated for control assembly withdrawal transients. Currently the EM2 core is equipped with six cylindrical drum-type control assemblies in the reflector zone for excess reactivity control and power maneuvering during the operating core life. This study investigates the system response to the control assembly withdrawal accident with various rotational speeds and reactivity worth to determine feasible control assembly design requirements from the physics viewpoint. The simulations have been conducted for single control assembly withdrawal transients without scram by a gas-cooled reactor plant simulator, which is based on a simplified plant nodal model, including the point reactor kinetics, single channel core thermal-fluid model, and a turbo-machinery performance model. Simulations were conducted for the middle-of- cycle core, when the excess reactivity of the core is the highest. Control assembly withdrawal times were varied from 1 (runaway) to 180 sec and reactivity worth was varied from 100 to 400 pcm. For a single control assembly withdrawal, the simulation has shown that the peak fuel temperature is expected to be ~1820°C when the assembly worth is 200 pcm and the runaway time is 1 sec per 180 degree rotation. The peak temperature could be reduced to ~1780°C if the assembly is rotated out in a moderate speed such as 1 degree/sec. These peak temperatures give a thermal margin of 22 to 24% to the melting point of uranium carbide fuel. The results also indicate that the current design with a single control assembly worth of 314 pcm may need adjustments in the future design. (author)

  13. The conceptual design of the standard and the reduced fuel assemblies for an advanced research reactor

    International Nuclear Information System (INIS)

    Ryu, Jeong Soo; Cho, Yeong Garp; Yoon, Doo Byung; Dan, Ho Jin; Chae, Hee Tack; Park, Cheol

    2005-01-01

    HANARO (Hi-flux Advanced Neutron Application Reactor), is an open-tank-in-pool type research reactor with a thermal power of 30MW. The HANARO has been operating at Korea Atomic Energy Research Institute since 1995. Based on the technical experiences in design and operation for the HANARO, the design of an Advanced Research Reactor (ARR) was launched by KAERI in 2002. The final goal of the project is to develop a new and advanced research reactor model which is superior in safety and economical aspects. This paper summarizes the design improvements of the conceptually designed standard fuel assembly based on the analysis results for the nuclear physics. It includes also the design of the reduced fuel assembly in conjunction with the flow tube as the fuel channel and the guide of the absorber rod. In the near future, the feasibility of the conceptually designed fuel assemblies of the ARR will be verified by investigating the dynamic and the thermal behaviors of the fuel assembly submerged in coolant

  14. Design of a full scale model fuel assembly for full power production reactor flow excursion experiments

    International Nuclear Information System (INIS)

    Nash, C.A.; Blake, J.E.; Rush, G.C.

    1990-01-01

    A novel full scale production reactor fuel assembly model was designed and built to study thermal-hydraulic effects of postulated Savannah River Site (SRS) nuclear reactor accidents. The electrically heated model was constructed to simulate the unique annular concentric tube geometry of fuel assemblies in SRS nuclear production reactors. Several major design challenges were overcome in order to produce the prototypic geometry and thermal-hydraulic conditions. The two concentric heater tubes (total power over 6 MW and maximum heat flux of 3.5 MW/m 2 ) (1.1E+6 BTU/(ft 2 hr)) were designed to closely simulate the thermal characteristics of SRS uranium-aluminum nuclear fuel. The paper discusses the design of the model fuel assembly, which met requirements of maintaining prototypic geometric and hydraulic characteristics, and approximate thermal similarity. The model had a cosine axial power profile and the electrical resistance was compatible with the existing power supply. The model fuel assembly was equipped with a set of instruments useful for code analysis, and durable enough to survive a number of LOCA transients. These instruments were sufficiently responsive to record the response of the fuel assembly to the imposed transient

  15. Irradiation performance of experimental fast reactor 'JOYO' MK-1 driver fuel assemblies

    International Nuclear Information System (INIS)

    Itaki, Toshiyuki; Kono, Keiichi; Tachi, Hirokatsu; Yamanouchi, Sadamu; Yuhara, Shunichi; Shibahara, Itaru

    1985-01-01

    The experimental fast reactor ''JOYO'' completed it's breeder core (MK-I) operation in January 1982. The MK-I driver fuel assemblies were removed from the core sequencially in order of burnup increase and have been under postirradiation examination (PIE). The PIE has almost been completed for 30 assemblies including the highest burnup assemblies of 48,000 MWD/MTM. It has been confirmed that all fuel assemblies have exhibited satisfactory performance without detrimental assembly deformation or without any indications of fuel pin breach. The irradiation conditions of the MK-I core were somewhat more moderate than those conditions envisioned for prototypic reactor. However the results of the examination revealed the typical irradiation behavior of LMFBR fuels, although such characteristics were benign as compared with those anticipated in high burnup fuels. Systematic performance data have been accumulated through the fuel fabrication, irradiation and postirradiation examination processes. Based on these data, the MK-I fuel designing and fabrication techniques were totally confirmed. This technical experience and the associated insight into irradiation behavior have established a milestone to the next step of fast reactor fuel development. (author)

  16. Planar ceramic membrane assembly and oxidation reactor system

    Science.gov (United States)

    Carolan, Michael Francis; Dyer, legal representative, Kathryn Beverly; Wilson, Merrill Anderson; Ohm, Ted R.; Kneidel, Kurt E.; Peterson, David; Chen, Christopher M.; Rackers, Keith Gerard; Dyer, deceased, Paul Nigel

    2007-10-09

    Planar ceramic membrane assembly comprising a dense layer of mixed-conducting multi-component metal oxide material, wherein the dense layer has a first side and a second side, a porous layer of mixed-conducting multi-component metal oxide material in contact with the first side of the dense layer, and a ceramic channeled support layer in contact with the second side of the dense layer. The planar ceramic membrane assembly can be used in a ceramic wafer assembly comprising a planar ceramic channeled support layer having a first side and a second side; a first dense layer of mixed-conducting multi-component metal oxide material having an inner side and an outer side, wherein the inner side is in contact with the first side of the ceramic channeled support layer; a first outer support layer comprising porous mixed-conducting multi-component metal oxide material and having an inner side and an outer side, wherein the inner side is in contact with the outer side of the first dense layer; a second dense layer of mixed-conducting multi-component metal oxide material having an inner side and an outer side, wherein the inner side is in contact with the second side of the ceramic channeled layer; and a second outer support layer comprising porous mixed-conducting multi-component metal oxide material and having an inner side and an outer side, wherein the inner side is in contact with the outer side of the second dense layer.

  17. Improvements in or relating to nuclear reactor fuel element assemblies

    International Nuclear Information System (INIS)

    Chetter, J.

    1975-01-01

    A description is given of a spacer grid comprising a substantially rigid grid structure formed from intersecting strip members defining cells which are penetrated by fuel pins bearing against rigid stops projecting inside the cells and spring locating members in the form of bow springs which extend longitudinally in the cells of the grid structure to hold the fuel pins against the rigid stops in the cells. The bow spring members of each line of cells extending in one direction across the grid structure have their corresponding ends interconnected by common longitudinal bridging strips to form a ladder spring assembly. (author)

  18. Effect of fuel assembly mechanical design changes on dynamic response of reactor pressure vessel system under extreme loadings

    International Nuclear Information System (INIS)

    Bhandari, D.R.; Hankinson, M.F.

    1993-01-01

    This paper presents the results of a study to assess the effect of fuel assembly mechanical design changes on the dynamic response of a pressurized water reactor vessel and reactor internals under Loss-Of-Coolant Accident (LOCA) conditions. The results of this study show that the dynamic response of the reactor vessel internals and the core under extreme loadings, such as LOCA, is very sensitive to fuel assembly mechanical design changes. (author)

  19. Tower Shielding Reactor II design and operation report. Vol. 3. Assembling and testing of the control mechanism assembly

    International Nuclear Information System (INIS)

    Ward, D.R.; Holland, L.B.

    1979-09-01

    The mechanisms that are operated to control the reactivity of the Tower Shielding Reactor II(TSR-II) are mounted on a Control Mechanism Housing (CMH) that is centered inside the reactor core. The information required to procure, fabricate, inspect, and assemble a CMH is contained in the ORNL engineering drawings listed in the appropriate sections. The components are fabricated and inspected from these drawings in accordance with a Quality Assurance Plan and a Manufacturing Plan. The material in this report describes the acceptance and performance tests of CMH subassemblies used ty the Tower Shielding Facility (TSF) staff but it can also be used by personnel fabricating the components. This information which was developed and used before the advent of the formalized QA Program and Manufacturing Plans evolved during the fabrication and testing of the first five CMHs

  20. Nuclear reactor maintenance technology assessment. Final summary report, September 16, 1978-September 15, 1979

    International Nuclear Information System (INIS)

    Tesar, D.; Ohanian, M.J.; Dugan, E.T.

    1980-01-01

    Nuclear power plants have exhibited a downtime of one day in four during the past decade. For mature LWR plants, 40% of this downtime is due to forced (unexpected) outages. These outages increase the loss of revenues and increase occupational radiation exposure. In 1979, the cost of maintenance of 70 operating plants was $1 billion per year. A fully remote maintenance technology would save 70% of this cost. PWR steam generator maintenance under fully remote system technology could save $270 million a year. BWR valve maintenance with fully remote technology could save $54,000,000 a year. Benefits for 150 plants by the early 1990's would be substantially higher; the total yearly savings would amount to $1.8 billion. The PWR steam generator would save $550 million while the BWR valve problem would save $140 million. For nuclear power plant maintenance, the vendors initially took steps to redesign and improve the reliability of the reactor system. The second step was to develop special maintenance tooling. The development of a generalized robotic manipulator having greater precision, dexterity, reliability, obstacle avoidance capability and load capacity is now feasible using microelectronics and computers. In order to drive this more general slave, the master controller must also be generalized to create a man-machine interface as transparent as possible; software modules must be developed which filter jitter, change scales, automaticaly control vision systems, and adapt force feedback signals in order to enhance the speed and precision of operation of the total system. A full complement of component technologies such as sensors, actuators, end-effectors, and remote TV vision systems must also be developed. Several other energy systems represent operations where such remote systems technology may be valuable

  1. Calculation of Savannah River K Reactor Mark-22 assembly LOCA/ECS power limits

    International Nuclear Information System (INIS)

    Fischer, S.R.; Farman, R.F.; Birdsell, S.A.

    1992-01-01

    This paper summarizes the results of TRAC-PF1/MOD3 calculations of Mark-22 fuel assembly of loss-of-coolant accident/emergency cooling system (LOCA/ECS) power limits for the Savannah River Site (SRS) K Reactor. This effort was part of a larger effort undertaken by the Los Alamos National Laboratory for the US Department of Energy to perform confirmatory power limits calculations for the SRS K Reactor. A method using a detailed three-dimensional (3D) TRAC model of the Mark-22 fuel assembly was developed to compute LOCA/ECS power limits. Assembly power was limited to ensure that no point on the fuel assembly walls would exceed the local saturation temperature. The detailed TRAC model for the Mark-22 assembly consisted of three concentric 3D vessel components which simulated the two targets, two fuel tubes, and three main flow channels of the fuel assembly. The model included 100% eccentricity between the assembly annuli and a 20% power tilt. Eccentricity in the radial alignment of the assembly annuli arises because axial spacer ribs that run the length of the fuel and targets are used. Wall-shear, interfacial-shear, and wall heat-transfer correlations were developed and implemented in TRAC-PF1/MOD3 specifically for modeling flow and heat transfer in the narrow ribbed annuli encountered in the Mark-22 fuel assembly design. We established the validity of these new constitutive models using separate-effects benchmarks. TRAC system calculations of K Reactor indicated that the limiting ECS-phase accident is a double-ended guillonite break in a process water line at the pump discharge (i.e., a PDLOCA). The fuel assembly with the minimum cooling potential is identified from this system calculation. Detailed assembly calculations then were performed using appropriate boundary conditions obtained from this limiting system LOCA. Coolant flow rates and pressure boundary conditions were obtained from this system calculation and applied to the detailed assembly model

  2. Analysis of the equalizing holes resistance in fuel assembly spike for lead-based reactor

    International Nuclear Information System (INIS)

    Zhang, Guangyu; Jin, Ming; Wang, Jianye; Song, Yong

    2017-01-01

    Highlights: • A RELAP5 model for a 10 MWth lead-based reactor was built to study the hydrodynamic characteristics between the equalizing holes in the fuel assembly spike. • Different fuel assembly total blockage scenarios and different resistances for different fuel assemblies were examined. • The inherent safety characteristics of the lead-based reactor was improved by optimizing the configuration of equalizing holes in the fuel assembly spike. - Abstract: To avoid the damage of the fuel rod cladding when a fuel assembly (FA) is totally blocked, a special configuration of the fuel assembly spike was designed with some equalizing holes in the center region which can let the coolant to flow during the totally blockage scenarios of FA. To study the hydrodynamic characteristics between the equalizing holes and an appropriate resistance, a RELAP5 model was developed for a 10 MWth lead-based reactor which used lead-bismuth as coolant. Several FA total blockage and partial core blockage scenarios were selected. The simulation results indicated that when all the FA spike equalizing holes had the same hydraulic resistance, only a narrow range of suitable equalizing holes resistances could be chosen when a FA was blocked. However, in the two or more FA blockage scenarios, there were no appropriate resistances to meet the requirement. In addition, with different FA spike equalizing holes with different resistances, a large range of suitable equalizing hole resistances could be chosen. Especially a series of suitable resistances were selected when the small power FA resistance was 1/2, 1/4, 1/8 of the large one. Under these circumstances, one, two or three FA blockages would not damage the core. These demonstrated that selecting a series of suitable hydraulic resistances for the equalizing holes could improve the safety characteristics of the reactor effectively.

  3. Development of a super-redundant multijoint manipulator for maintenance of nuclear reactors

    International Nuclear Information System (INIS)

    Ma, Shugen; Hirose, Shigeo.

    1994-01-01

    A tendon-driven manipulator, the CT Arm, has a specific tendon traction transmission mechanism, in which a pair of tendons for driving a joint is pulled from base actuators via pulleys mounted on the based-side joints. The mechanism makes the most of the coupled drive function of the tendon tractions and thus enables the lightweight manipulator to exhibit enormous payload capability. By this tendon-driven mechanism, a multijoint manipulator with super-redundant degrees of freedom could be realized, which is suitable to the maintenance of nuclear reactors. In this article, we introduce the CT Arm and discuss the possibility to generate a multijoint maintenance manipulator which has a super-redundant degrees of freedom. (author)

  4. Pump/heat exchanger assembly for pool-type reactor

    International Nuclear Information System (INIS)

    Nathenson, R.D.; Slepian, R.M.

    1989-01-01

    This patent describes a heat exchanger and pump assembly for transferring thermal energy from a heated, first electrically conductive fluid to a pumped, second electrically conductive fluid and for transferring internal energy from the pumped, second electrically conductive fluid to the first electrically conductive fluid, the assembly adapted to be disposed within a pool of the first electrically conductive fluid and comprising: a heat exchanger comprising means for defining a first annularly shaped cavity for receiving a flow of the second electrically conductive fluid and a plurality of tubes disposed within the cavity, whereby the second electrically conductive fluid in the cavity is heated, each of the tubes having an input and an output end. The input ends being disposed at the top of the heat exchanger for receiving from the pool a flow of the first electrically conductive fluid therein. The output ends being disposed at the bottom of and free of the cavity defining means for discharging the first electrically conductive fluid directly into the pool; a pump disposed beneath the heat exchanger and comprised of a plurality of flow couplers disposed in a circular array, each flow coupler comprised of a pump duct for receiving the first electrically conductive fluid and a generator duct for receiving the second electrically conductive fluid

  5. Fuel assembly leak tightness control on WWER-1000 reactor

    International Nuclear Information System (INIS)

    Ivanova, R.; Gerchev, N.; Mateev, A.

    2001-01-01

    The main index for integrity of the fuel rods cladding is the specific activity value of the primary coolant. This value determines the safe operation of the reactor. The limit for safe operation of WWER-1000 reactor is the value of the total activity of Iodine isotopes in the primary coolant 5.0x10 -3 Ci/l. The paper briefly describes the methodology for performing a fuel tightness test (sipping test) and shows the results from these tests performed during the period 1987 -1999 in units 5 and 6 at the Kozloduy NPP. An additional index related to the safe operation is defined to characterize the fuel cladding integrity Fuel Reliability Index (FRI). The FRI is defined as value of the average activity of 131 I in the primary coolant, corrected with a part of precipitated 235 U migration and fixed to the general permanent purification frequency. Two criteria (quantitative and statistic) are determined to qualify the fuel cladding integrity. The results from sipping tests show good reliability of the fuel irradiated in unit 5 and 6 at the Kozloduy NPP

  6. Operation and maintenance of the RB reactor, Annual report for 1977; Pogon i odrzavanje reaktora RB, Izvestaj o radu u 1977. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Vranic, S [Boris Kidric Institute of Nuclear Sciences Vinca, Beograd (Yugoslavia)

    1977-07-01

    The annual report for 1977 includes the following: utilization of the RB reactor; new regulations and instructions for reactor operation; improvement of experimental possibilities of the RB reactor; state of the reactor equipment; dosimetry and radiation protection; reactor staff. Five annexes are concerned with: testing the properties of preamplifiers for linear and logarithmic experimental channels; properties of the neutron converter; maintenance of the reactor equipment; purchase of new equipment; and the program for training reactor operators.

  7. Feasibility study of teleoperational maintenance using real-time simulator for experimental fusion reactor

    International Nuclear Information System (INIS)

    Hamada, Tomoyuki; Tanaka, Keiji; Oka, Kiyoshi; Shibanuma, Kiyoshi

    2004-01-01

    The maintenance manipulator for the experimental fusion reactor has long vertical and horizontal telescopic booms to access the neutral beam injector of the fusion reactor. Due to this boom structure, the vibration and deflection of the manipulator are the critical issues for the accurate operation. A real-time simulation system was constructed to evaluate the maneuverability of the manipulator under these vibration and deflection. In this simulation system, the dynamic behavior of the flexible manipulator is calculated synchronized with the real-time control input of the human operator. A vibration and position compensation method was adapted to improve the maneuverability. Through the evaluation using the real-time simulation system, it was verified that the manipulator is maneuverable by using vibration and position compensation. (author)

  8. Application of OLM Techniques to Enhance the Calibration and Maintenance Practices In ESSalam Nuclear Research Reactor

    International Nuclear Information System (INIS)

    Touati, S.; Messai, A.; Abdellani, I.

    2013-06-01

    As a beginning, we consider the case of the coolant pumps (electrical motor and a driven pump) which are critical part in all nuclear facility and are an element in safety processes requiring highest reliability condition monitoring. In order to determine their operational characteristics, degradation mechanisms, and failure modes, we will use some on-line acquired parameters such as: the vibration data collection, temperature measurement, ...etc. Through adequate analysis, including artificial intelligence techniques and frequency analysis, performed on-line on these recorded data, we will be able to establish a predictive maintenance program for crucial rotating equipment in our research reactor. (authors)

  9. Upgrade of the Department of Energy's Savannah River Site's reactor operations and maintenance procedures

    International Nuclear Information System (INIS)

    Walsh, T.E.

    1991-01-01

    This paper describes the program in progress at the Savannah River Site (SRS) to upgrade the existing reactor operating and maintenance procedures to current commercial nuclear industry standards. In order to meet this goal, the following elements were established: administrative procedures to govern the upgrade process, tracking system to provide status and accountability; and procedure writing guides. The goal is to establish a benchmark of excellence by which other Department of Energy (DOE) sites will measure themselves. The above three elements are addressed in detail in this paper

  10. Electric arc apparatus for severing split-pin assemblies of guide tubes of nuclear reactors

    International Nuclear Information System (INIS)

    Burns, D.C.; Kauric, C.E.; Persang, J.C.

    1987-01-01

    This patent describes an apparatus for use in the replacement of an old split-pin assembly of a guide tube of a nuclear reactor by a new split-pin assembly, the old split-pin assembly including an old split pin and an old nut securing the old split pin to the guide tube, the old split-pin assembly and the guide tube being radioactive. The apparatus includes a metal disintegration machining tool, the tool having an electrode, means for mounting the tool submerged in a pool of water in engagement with the guide tube and with the old split-pin assembly secured to the guide tube, the tool being so mounted with the electrode in position to coact electrically with the last-named old split-pin assembly but not with the guide tube, and means, connected to the tool, for firing a disintegrating arc between the electrode and the assembly to disintegrate the assembly into readily removable fragments

  11. Modularized mirror fusion reactor concept with emphasis on fabricability, assembly, and disassembly

    International Nuclear Information System (INIS)

    Peterson, M.A.; Werner, R.W.; Hoffman, M.A.; Carlson, G.A.

    1975-01-01

    A progress report on a continuing study directed toward the development of mirror reactor designs which simultaneously satisfy the various engineering, economic, and maintenance consideration is presented. Two new blanket and coil structure designs are presented which satisfy engineering requirements equally as well as previous designs while offering substantial gains in accessibility for maintenance. Because of the commercial requirement for a high duty cycle and the possible high frequency of blanket module removal--for either maintenance replacement--the module removal must be accomplished quickly with a minimum disruption of reactor operations. The blanket and coil structure designs allow the removal of any one of the identical blanket modules without disturbing either the remaining modules or the coil and its associated support structure. With fabricated coil structure costs estimated at $2.50/lbm and the reactor net electrical power calculated from a plasma and reactor system model detailed in the paper, coil and support structure costs of between 100 to 200 $/kwe were estimated. (U.S.)

  12. Nuclear Systems Enhanced Performance Program, Maintenance Cycle Extension in Advanced Light Water Reactor Design

    Energy Technology Data Exchange (ETDEWEB)

    Professor Neill Todreas

    2001-10-01

    A renewed interest in new nuclear power generation in the US has spurred interest in developing advanced reactors with features which will address the public's concerns regarding nuclear generation. However, it is economic performance which will dictate whether any new orders for these plants will materialize. Economic performance is, to a great extent, improved by maximizing the time that the plant is on-line generating electricity relative to the time spent off-line conducting maintenance and refueling. Indeed, the strategy for the advanced light water reactor plant IRIS (International Reactor, Innovative and Secure) is to utilize an eight year operating cycle. This report describes a formalized strategy to address, during the design phase, the maintenance-related barriers to an extended operating cycle. The top-level objective of this investigation was to develop a methodology for injecting component and system maintainability issues into the reactor plant design process to overcome these barriers. A primary goal was to demonstrate the applicability and utility of the methodology in the context of the IRIS design. The first step in meeting the top-level objective was to determine the types of operating cycle length barriers that the IRIS design team is likely to face. Evaluation of previously identified regulatory and investment protection surveillance program barriers preventing a candidate operating PWR from achieving an extended (48 month) cycle was conducted in the context of the IRIS design. From this analysis, 54 known IRIS operating cycle length barriers were identified. The resolution methodology was applied to each of these barriers to generate design solution alternatives for consideration in the IRIS design. The methodology developed has been demonstrated to narrow the design space to feasible design solutions which enable a desired operating cycle length, yet is general enough to have broad applicability. Feedback from the IRIS design team

  13. Optimization of seed-blanket type fuel assembly for reduced-moderation water reactor

    Energy Technology Data Exchange (ETDEWEB)

    Shelley, Afroza; Shimada, Shoichiro; Kugo, Teruhiko; Okubo, Tsutomu E-mail: okubo@hems.jaeri.go.jp; Iwamura, Takamichi

    2003-10-01

    Parametric studies have been performed for a PWR-type reduced-moderation water reactor (RMWR) with the seed-blanket type fuel assembles to achieve a high conversion ratio, negative void reactivity coefficient and a high burnup by using MOX fuel. From the viewpoint of reactor safety analysis, the fuel temperature coefficients were also studied. From the result of the burnup calculation, it has been seen that ratio of 40-50% of outer blanket in a seed-blanket assembly gives higher conversion ratio compared to the other combination of seed-blanket assembly. And the recommended number of (seed+blanket) layers is 20, in which the number of seed (S) layers is 15 (S15) and blanket (B) layers is 5 (B5). It was found that the conversion ratio of seed-blanket assembly decreases, when they are arranged looks like a flower shape (Hanagara). By the optimization of different parameters, S15B5 fuel assembly with the height of seed of 1000 mmx2, internal blanket of 150 mm and axial blanket of 400 mmx2 is recommended for a reactor of high conversion ratio. In this assembly, the gap of seed fuel rod is 1.0 mm and blanket fuel rod is 0.4 mm. In S15B5 assembly, the conversion ratio is 1.0 and the burnup is 38.18 GWd/t in (seed+internal blanket+outer blanket) region. However, the burnup is 57.45 GWd/t in (seed+internal blanket) region. The cycle length of the core is 16.46 effective full power in month (EFPM) by six batches and the enrichment of fissile Pu is 14.64 wt.%. The void coefficient is +21.82 pcm/%void, however, it is expected that the void coefficient will be negative if the radial neutron leakage is taken into account in the calculation. It is also possible to use S15B5 fuel assembly as a high burnup reactor 45 GWd/t in (seed+internal blanket+outer blanket) region, however, it is necessary to decrease the height of seed to 500 mmx2 to improve the void coefficient. In this reactor, the conversion ratio is 0.97 and void coefficient is +20.81 pcm/%void. The fuel temperature

  14. Physical characteristics of non-fuel assembly reactor components

    International Nuclear Information System (INIS)

    Hawkes, E.C.

    1994-09-01

    The primary objective of this report is to enhance the utility of the Characteristics Data Base (CDB). This has been accomplished by providing a pictorial representation of the principal non-fuel assembly (NFA) components along with a tabular summary of key information about each type of component. This report is intended for use as an adjunct to the CDB. Toward this end, the report may be used either as a complement to the detailed descriptions in the CDB, or as a stand-alone document that acts as an illustrated abstract of the CDB. Line drawings of major NFA components are included. Data not provided in the CDB are also included. Summary descriptions of each component are given in tabular format

  15. Calculation of local characteristics of velocity field in turbulent coolant flow in fast reactor fuel assembly

    International Nuclear Information System (INIS)

    Muehlbauer, P.

    1981-08-01

    Experience is described gained with the application of computer code VELASCO in calculating the velocity field in fast reactor fuel assemblies taking into account configuration disturbances due to fuel pin displacement. Theoretical results are compared with the results of experiments conducted by UJV on aerodynamic models HEM-1 (model of the fuel assembly central part) and HEM-2 (model of the fuel assembly peripheral part). The results are reported of calculating the distribution of shear stress in wetted rod surfaces and in the assembly wall (model HEM-2) and the corresponding experimental results are shown. The shear stress distribution in wetted surfaces obtained using the VELASCO code allowed forming an opinion on the code capability of comprising local parameters of turbulent flow through a fuel rod bundle. The applicability was also tested of the code for calculating mean velocities in the individual zones, eg., in elementary cells. (B.S.)

  16. Closed Loop In-Reactor Assembly (CLIRA): a fast flux test facility test vehicle

    International Nuclear Information System (INIS)

    Oakley, D.J.

    1978-01-01

    The Closed Loop In-Reactor Assembly (CLIRA) is a test vehicle for in-core material and fuel experiments in the Fast Flux Test Facility (FFTF). The FFTF is a fast flux nuclear test reactor operated for the Department of Energy (DOE) by Westinghouse Hanford Company in Richland, Washington. The CLIRA is a removable/replaceable part of the Closed Loop System (CLS) which is a sodium coolant system providing flow and temperature control independent of the reactor coolant system. The primary purpose of the CLIRA is to provide a test vehicle which will permit testing of nuclear fuels and materials at conditions more severe than exist in the FTR core, and to isolate these materials from the reactor core

  17. Dose rate estimates from irradiated light-water-reactor fuel assemblies in air

    International Nuclear Information System (INIS)

    Lloyd, W.R.; Sheaffer, M.K.; Sutcliffe, W.G.

    1994-01-01

    It is generally considered that irradiated spent fuel is so radioactive (self-protecting) that it can only be moved and processed with specialized equipment and facilities. However, a small, possibly subnational, group acting in secret with no concern for the environment (other than the reduction of signatures) and willing to incur substantial but not lethal radiation doses, could obtain plutonium by stealing and processing irradiated spent fuel that has cooled for several years. In this paper, we estimate the dose rate at various distances and directions from typical pressurized-water reactor (PWR) and boiling-water reactor (BWR) spent-fuel assemblies as a function of cooling time. Our results show that the dose rate is reduced rapidly for the first ten years after exposure in the reactor, and that it is reduced by a factor of ∼10 (from the one year dose rate) after 15 years. Even for fuel that has cooled for 15 years, a lethal dose (LD50) of 450 rem would be received at 1 m from the center of the fuel assembly after several minutes. However, moving from 1 to 5 m reduces the dose rate by over a factor of 10, and moving from 1 to 10 m reduces the dose rate by about a factor of 50. The dose rates 1 m from the top or bottom of the assembly are considerably less (about 10 and 22%, respectively) than 1 m from the center of the assembly, which is the direction of the maximum dose rate

  18. Stabilization of magnet assemblies of permanent magnet sodium flowmeters used in fast breeder reactors

    Energy Technology Data Exchange (ETDEWEB)

    Rajan, K.K., E-mail: kkrajan@igcar.gov.in; Vijayakumar, G.

    2014-08-15

    Highlights: • Stabilization procedure for ALNICO-5 permanent magnet material is evolved. • Effect of time and temperature on ALNICO-5 assembly is determined. • Suitability of ALNICO-5 flowmeters at high temperatures is established. • Temperature coefficient of flux density is determined. - Abstract: Permanent magnet flow meters (PMFMs) are used to measure the sodium flow in sodium cooled Fast Breeder Reactor Circuits. Prototype fast breeder reactor (PFBR) which is under construction at Kalpakkam is a 500 MWe, sodium cooled, pool type reactor. Sodium flow measurement in various loops of the reactor is of prime importance from operational and safety point of view. To measure the flow of electrically conducting liquid sodium, in primary and secondary circuit pipe lines of PFBR, permanent magnet flow meters are used. PMFM is a non-invasive device, which works on the principle of generation of motional EMF by magnetic forces exerted on the charges in a moving conductor. Flowmeters of different pipe sizes ranging from 10 mm to 200 mm pipe diameter are required for PFBR. Long term performance of the flowmeters mainly depends on stability of permanent magnets used in flowmeters to generate constant magnetic field in stainless steel (SS) pipes. This paper describes the effects of time and temperature on permanent magnet assemblies made of ALNICO-V used in PFBR flowmeters. The stabilization methodology for ALNICO-V permanent magnet assemblies is evolved and established. Loss of magnetic field strength with respect to time and temperatures is determined by experiments and found negligible.

  19. Reactor core T-H characteristics determination in case of parallel operation of different fuel assembly types

    International Nuclear Information System (INIS)

    Hermansky, J.; Petenyi, V.; Zavodsky, M.

    2009-01-01

    The WWER-440 nuclear fuel vendor permanently improve the assortment of produced nuclear fuel assemblies for achieving better fuel cycle economy and reactor operation safety. Therefore it is necessary to have the skilled methodology and computing code for analyzing factors which affecting the accuracy of flow redistributed determination through reactor on flows through separate parts of reactor core in case of parallel operation different assembly types. Whereas the geometric parameters of new manufactured assemblies were changed recently, the calculated flows through the fuel parts of different type of assemblies are depended also on their real position in reactor core. Therefore the computing code CORFLO was developed in VUJE Trnava for carrying out stationary analyses of T-H characteristics of reactor core within 60 deg symmetry. The CORFLO code deals the area of the active core which consists of 312 fuel assemblies and 37 control assemblies. Regarding the rotational 60 deg symmetry of reactor core only 1/6 of reactor core with 59 fuel assemblies is calculated. Computing code is verified and validated at this time. Paper presents the short description of computing code CORFLO with some calculated results. (Authors)

  20. Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Seyyed Mohammad Hassan Hosseini

    2016-05-01

    Full Text Available Scheduling problem for the hybrid flow shop scheduling problem (HFSP followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All machines can process all kinds of parts in this stage but each machine can process only one part at the same time. The second stage is a single assembly machine or a single assembly team of workers. The aim is to schedule the parts on the machines and assembly sequence and also determine when the preventive maintenance activities get done in order to minimize the completion time of all products (makespan. A mathematical modeling is presented and its validation is shown by solving an example in small scale. Since this problem has been proved strongly NP-hard, in order to solve the problem in medium and large scale, four heuristic algorithms is proposed based on the Johnson’s algorithm. The numerical experiments are used to run the mathematical model and evaluate the performance of the proposed algorithms.

  1. Nuclear reactor fuel assembly with a removable top nozzle

    International Nuclear Information System (INIS)

    Shallenberger, J.M.; Ferlan, S.J.

    1986-01-01

    This patent describes a fuel assembly having at least one control rod guide thimble and a top nozzle, the top nozzle including a transversely extending adapter plate. An improved attaching structure is described for removably mounting the top nozzle on the guide thimble comprising: (a) means defining an outer socket in the top nozzle, the outer socket defining means including a passageway extending through the adapter plate and having a first mating element defined in the adapter plate within the passageway; (b) means on an upper end of the guide thimble defining an inner socket, the inner socket defining means including an elongated sleeve having an upper end portion. The upper end portion of the sleeve has a second mating element formed thereon and at least one elongated axial slot defined therein for permitting radial movement of the sleeve upper end portion between a compressed releasing position for removing and inserting the inner socket from and into the outer socket and an expanded locking position for locking the inner and outer sockets together

  2. Development of a robot for decontamination of reactor well and maintenance pit wall surfaces

    Energy Technology Data Exchange (ETDEWEB)

    Miyakawa, Minoru; Nozawa, Katsuro; Mizutani, Takeshi; Onozuka, Kazuaki; Morita, Isamu

    1984-03-01

    A robot has been developed at Hamaoka BWR Power Plant of Chubu Electric Power Company, Inc., which performs the decontamination of the wall surfaces of reactor wells and maintenance pits. The robot is controlled with a control box through a micro-computer. The mechanical structure and working principle of this robot is explained. One of the special features of this robot is that it perceives the steps on a wall, and washes the vertical and horizontal surfaces with two different types of brushes. As the material for the bristles of the brushes, nylon with alumina as abrasive (TAINEX-A made by Dupont Ltd.) was selected after some experience. The design specifications of the brushes were determined, based on the results of intensive performance test, which are shown in this report. The efficiency of this robot was proved by applying it to the decontamination of the reactor wells in the periodic inspection and maintenance of Unit 1 and Unit 2 in the Hamaoka BWR Power Plant. As the result of this decontamination, the contamination level was reduced from 10/sup 3/ ..mu..Ci/cm/sup 2/ to about 10/sup 5/ ..mu..Ci/cm/sup 2/. The measured results of contamination after the first and third decontamination works are listed for various parts of the well surfaces.

  3. Development of a robot for decontamination of reactor well and maintenance pit wall surfaces

    International Nuclear Information System (INIS)

    Miyakawa, Minoru; Nozawa, Katsuro; Mizutani, Takeshi; Onozuka, Kazuaki; Morita, Isamu

    1984-01-01

    A robot has been developed at Hamaoka BWR Power Plant of Chubu Electric Power Company, Inc., which performs the decontamination of the wall surfaces of reactor wells and maintenance pits. The robot is controlled with a control box through a micro-computer. The mechanical structure and working principle of this robot is explained. One of the special features of this robot is that it perceives the steps on a wall, and washes the vertical and horizontal surfaces with two different types of brushes. As the material for the bristles of the brushes, nylon with alumina as abrasive (TAINEX-A made by Dupont Ltd.) was selected after some experience. The design specifications of the brushes were determined, based on the results of intensive performance test, which are shown in this report. The efficiency of this robot was proved by applying it to the decontamination of the reactor wells in the periodic inspection and maintenance of Unit 1 and Unit 2 in the Hamaoka BWR Power Plant. As the result of this decontamination, the contamination level was reduced from about 10 -3 μCi/cm 2 to about 10 -5 μCi/cm 2 . The measured results of contamination after the first and third decontamination works are listed for various parts of the well surfaces. (Aoki, K.)

  4. Advanced boiling water reactor (ABWR). Design, construction, operation and maintenance experience

    International Nuclear Information System (INIS)

    Idesawa, M.

    1998-01-01

    The ABWR has experienced all phases of design, construction, operation and maintenance at Kashiwazaki-Kariwa Nuclear Power Station Units No.6 and 7 and confirmed that originally intended development targets have been achieved with highly satisfactory results. This is the fruit of a project that collected wisdom from various sources under a international cooperative organization, with Tokyo Electric Power Company taking the leading role from the onset. These two units have not only demonstrated that ABWRs have superior performance as the first standard units of advanced light water reactor but also aroused a hope for the big potential advantages that ABWRs can provide us. The ABWR has already been awarded a U.S. standard license for having proved that it can comply with the requirements of international regulatory systems with an ample margin. There are also many construction programs with ABWRs progressing both domestically and abroad, suggesting that it has won recognition as an international standard plant. We will do our utmost to perfect the operation and maintenance records of Kashiwazaki-Kariwa Units No.6 and 7, which is the top runner among ABWRs, and to make known the superiority of this reactor to the world. (J.P.N.)

  5. A Mixed-Oxide Assembly Design for Rapid Disposition of Weapons Plutonium in Pressurized Water Reactors

    International Nuclear Information System (INIS)

    Alonso, Gustavo; Adams, Marvin L.

    2002-01-01

    We have created a new mixed-oxide (MOX) fuel assembly design for standard pressurized water reactors (PWRs). Design goals were to maximize the plutonium throughput while introducing the lowest perturbation possible to the control and safety systems of the reactor. Our assembly design, which we call MIX-33, offers some advantages for the disposition of weapons-grade plutonium; it increases the disposition rate by 8% while increasing the worth of control material, compared to a previous Westinghouse design. The MIX-33 design is based upon two ideas: the use of both uranium and plutonium fuel pins in the same assembly, and the addition of water holes in the assembly. The main result of this paper is that both of these ideas are effective at increasing Pu throughput and increasing the worth of control material. With this new design, according to our analyses, we can transition smoothly from a full low-enriched-uranium (LEU) core to a full MIX-33 core while meeting the operational and safety requirements of a standard PWR. Given an interruption of the MOX supply, we can transition smoothly back to full LEU while meeting safety margins and using standard LEU assemblies with uniform pinwise enrichment distribution. If the MOX supply is interrupted for only one cycle, the transition back to a full MIX-33 core is not as smooth; high peaking could cause power to be derated by a few percent for a few weeks at the beginning of one transition cycle

  6. Nuclear mass inventory, photon dose rate and thermal decay heat of spent research reactor fuel assemblies

    International Nuclear Information System (INIS)

    Pond, R.B.; Matos, J.E.

    1996-05-01

    As part of the Department of Energy's spent nuclear fuel acceptance criteria, the mass of uranium and transuranic elements in spent research reactor fuel must be specified. These data are, however, not always known or readily determined. It is the purpose of this report to provide estimates of these data for some of the more common research reactor fuel assembly types. The specific types considered here are MTR, TRIGA and DIDO fuel assemblies. The degree of physical protection given to spent fuel assemblies is largely dependent upon the photon dose rate of the spent fuel material. These data also, are not always known or readily determined. Because of a self-protecting dose rate level of radiation (dose rate greater than 100 ren-x/h at I m in air), it is important to know the dose rate of spent fuel assemblies at all time. Estimates of the photon dose rate for spent MTR, TRIGA and DIDO-type fuel assemblies are given in this report

  7. Study of a fuel assembly for the nuclear reactor of IV generation cooled with supercritical water

    International Nuclear Information System (INIS)

    Barragan M, A.; Martin del Campo M, C.; Francois L, J. L.; Espinosa P, G.

    2011-11-01

    In this work a neutron study is presented about a square assembly design of double line of fuel rods, with moderator box to the center of the arrangement, for a nuclear reactor cooled with supercritical water (SCWR). The SCWR reactor was chosen by the characteristics of its design, mainly because is based in light water reactors (PWR and BWR), and the operational experience that has of them allow to use models and similar programs to simulate the fuel and the nucleus of this type of reactors. To develop the necessary models and to carry out the design and analysis of the SCWR reactor, the neutron codes MCNPX and Helios were used. The reason of using both codes, is because the code MCNPX used thoroughly in the neutron simulation of these reactors, it has been our reference code to analyze the results obtained with the Helios code which results are more efficient because its calculation times are minors. In the nucleus design the same parameters for both codes were considered. The results show that the design with Helios is a viable option to simulate these reactors since their values of the neutrons multiplication factor are very similar to those obtained with MCNPX. On the other hand, it could be corroborated that the CASMO-4 code is inadequate to simulate the fuel to the temperature conditions and water pressure in the SCWR. (Author)

  8. System for determining the local power in the fuel assembly of a nuclear reactor

    International Nuclear Information System (INIS)

    Rolstad, Erik; Korpas, T.-H.; Leyse, R.H.; Smith, R.D.

    1979-01-01

    System for determining the local power in the fuel assembly of a nuclear reactor which includes a rod conducting the heat and electricity, along which axial areas act as a gamma radiation thermometer. Each area includes a thermal bridge, a cold source and a pair of junctions acting as thermocouples so placed that they measure the temperature difference between the thermal bridge and the cold source. The power created by the fuel assembly near each area acting as gamma thermometer is found from this difference in temperature [fr

  9. Spacing grids for a fuel pencil bundle in a nuclear reactor assembly

    International Nuclear Information System (INIS)

    Feutrel, Claude.

    1977-01-01

    This invention relates to the lattices forming the spacing of a bundle of clad fuel pencils in a nuclear reactor assembly, particularly in a water cooled or fast reactor, the purpose of such lattices being to maintain these pencils parallel with respect to each other and according to a given lattice arrangement, whilst also providing these pencils with a flexible support according to different successive areas apportioned with their length in order to present them from vibrating under the effect of the circulation of a liquid coolant environment flowing in contact with these pencils [fr

  10. A device for supporting a pin bundle in a nuclear reactor assembly casing

    International Nuclear Information System (INIS)

    Marmonier, Pierre; Mesnage, Bernard; Teulon, Jean; Vayra, Jean; Venobre, Henri.

    1974-01-01

    Description is given of a device for supporting a pin-bundle in a nuclear reactor assembly casing. That device comprises a member coaxially mounted at the bottom of the vertically mounted casing, adapted to support a plurality of parallel rails along whose edges slide grooves made in the pin-plugs. It is characterized in that said supporting member is provided with a lateral groove open toward its periphery, cooperating with clamping-lugs that form extensions of the rail-sides and comprise an inwardly directed portion adapted to be engaged in the groove. This can be applied to fast neutron nuclear reactors [fr

  11. The application of neural networks for optimization of the configuration of fuel assemblies in PWR reactors

    International Nuclear Information System (INIS)

    Sadighi, M.; Setayeshi, S.; Salehi, A.A.

    2002-01-01

    This paper presents a new method to solve the problem of finding the best configuration of fuel assemblies in a PWR (Pressurized Water Reactor) core. Finding an optimum solution requires a huge amount of calculations in classical methods. It has been shown that the application of continuous Hop field neural network accompanied by the Simulated Annealing method to this problem not only reduces the volume of the calculations, but also guarantees finding the best solution. In this study flattening of neutron flux inside the reactor core of Brusher NPP is considered as an objective function. The result shows the optimum core configuration which is in agreement with the pattern proposed by the designer

  12. Comparison of thermal capabilities of the fuel assemblies for the WWR-M reactor

    International Nuclear Information System (INIS)

    Kirsanov, G.A.; Konoplev, K.A.; Findeisen, A.; Shishkina, Zh.A.

    1989-01-01

    On the basis of measurement results of the WWR-M2, WWR-M3 and WWR-M5 fuel element can temperature in the WWR-M reactor core their thermal capabilities are compared. The use of the WWR-M5 fuel assemblies instead of the WWR-M2 ones in the WWR-M reactor permits to increase specific heat loading by a factor of 2.7. The possibility to increase fuel can temperature up to 110 deg C is confirmed experimentally which corresponds to specific heat loading of 900 kW/l

  13. Research Project 'RB research nuclear reactor' (operation and maintenance), Final report; Naucnoistrazivacki projekt 'Istrazivacki nuclearni reaktor RB, (pogon i odrzavanje), Zavrsni elaborat projekta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-07-01

    This final report covers operation and maintenance activities at the RB reactor during period from 1981-1985. First part covers the RB reactor operation, detailed description of reactor components, fuel, heavy water, reactor vessel, cooling system, equipment and instrumentation, auxiliary systems. It contains data concerned with dosimetry and radiation protection, reactor staff, and financial data. Second part deals maintenance, regular control and testing of reactor equipment and instrumentation. Third part is devoted to basic experimental options and utilization of the RB reactor including training.

  14. Remote maintenance of in-vessel components in Tokamak Fusion Test Reactor

    International Nuclear Information System (INIS)

    Loesser, G.D.; Heitzenroeder, P.; Kungl, D.; Dylla, H.F.; Cerdan, G.

    1990-01-01

    The Tokamak Fusion Test Reactor (TFTR) will generate a total of 3 x 10 21 neutrons during its planned D-T operational period. A maintenance manipulator has been designed and tested to minimize personnel radiation during in-vessel maintenance activities. Its functions include visual inspection, first-wall tile replacement, cleaning, diagnostics calibrations and leak detection. To meet these objectives, the TFTR maintenance manipulator is required to be operable in the TFTR high vacuum environment, typically -8 torr, ( -6 Pa). Geometrically, the manipulator must extend 180 0 in either direction around the torus to assure complete coverage of the vessel first-wall. The manipulator consists of a movable carriage, and movable articulated link sections which are driven by electrical actuators. The boom has vertical load capacity of 455 kg and lateral load capacity of 46 kg. The boom can either be fitted with a general inspection arm or dextrous slave arms. The general inspection arm is designed to hold the leak detector and an inspection camera; it is capable of rotation along two axes and has a linkage system which permits motion normal to the vacuum vessel wall. All systems except the dextrous slave arms are operable in a vacuum. (author)

  15. Requirement for PLK1 kinase activity in the maintenance of a robust spindle assembly checkpoint

    Directory of Open Access Journals (Sweden)

    Aisling O'Connor

    2016-01-01

    Full Text Available During mitotic arrest induced by microtubule targeting drugs, the weakening of the spindle assembly checkpoint (SAC allows cells to progress through the cell cycle without chromosome segregation occurring. PLK1 kinase plays a major role in mitosis and emerging evidence indicates that PLK1 is also involved in establishing the checkpoint and maintaining SAC signalling. However, mechanistically, the role of PLK1 in the SAC is not fully understood, with several recent reports indicating that it can cooperate with either one of the major checkpoint kinases, Aurora B or MPS1. In this study, we assess the role of PLK1 in SAC maintenance. We find that in nocodazole-arrested U2OS cells, PLK1 activity is continuously required for maintaining Aurora B protein localisation and activity at kinetochores. Consistent with published data we find that upon PLK1 inhibition, phosphoThr3-H3, a marker of Haspin activity, is reduced. Intriguingly, Aurora B inhibition causes PLK1 to relocalise from kinetochores into fewer and much larger foci, possibly due to incomplete recruitment of outer kinetochore proteins. Importantly, PLK1 inhibition, together with partial inhibition of Aurora B, allows efficient SAC override to occur. This phenotype is more pronounced than the phenotype observed by combining the same PLK1 inhibitors with partial MPS1 inhibition. We also find that PLK1 inhibition does not obviously cooperate with Haspin inhibition to promote SAC override. These results indicate that PLK1 is directly involved in maintaining efficient SAC signalling, possibly by cooperating in a positive feedback loop with Aurora B, and that partially redundant mechanisms exist which reinforce the SAC.

  16. Manufacturing requirements of reactor assembly components for PFBR (Paper No. 041)

    International Nuclear Information System (INIS)

    Murty, C.G.K.; Bhoje, S.B.

    1987-02-01

    This paper enumerates the requirements of 500 MWe Prototype Fast Breeder Reactor (PFBR) components and considering the present state of art of Indian industry an analysis is made on the challenges to be faced in manufacture highlighting the areas needing development. The large sizes and weights of the components coupled with the limitations on shop facilities and ODC transport, demand part of the fabrication to be done at shop and balance assembly work as well as certain assembly machining operations to be done at site work shop. The stringent geometrical tolerances coupled with extensive destructive and non-destructive examinations call for balanced and low heat input welding techniques and special inspection equipment like electronic co-ordinate determination system. The present paper deals with the specific manufacturing problems of the main reactor components. (author)

  17. Recovery of reactor electrical assemblies using differential de-encapsulation to remove dielectric insulation systems

    International Nuclear Information System (INIS)

    Hubrig, J.G.; Hammerstone, E.B.

    1986-01-01

    State-of-the-art de-encapsulation technologies associated with the conventional dielectric insulation systems employed in the construction of electrical coils and power distribution systems do not allow for accurate fatigue/failure analysis or reliable recovery of costly assembly components. Differential de-encapsulation allows for the selective removal of contemporary thermoset resin based insulation systems to allow non-destructive penetration of insulation wall thicknesses to both examine critical areas and recover high performance metallic and non-metallic inserts for remanufacture; significantly reducing replacement costs and reactor downtime. The authors' analysis describes how the availability of engineering data from the selective and non-destructive removal of insulation materials will aid in the evaluation of original manufacture, materials and procedures; enabling redesign to enhance subsequent on line performance. They also discuss why the ability to recover coil and core assemblies for remanufacture will have a major economic impact on reactor management costs

  18. Correlation and flux tilt measurements of coupled-core reactor assemblies

    International Nuclear Information System (INIS)

    Harries, J.R.

    1976-01-01

    The systematics of coupling reactivity and time delay between cores have been investigated with a series of coupled-core assemblies on the AAEC Split-table Critical Facility. The assemblies were similar to the Universities' Training Reactor (UTR), but had graphite coupling region thickness of 450 mm, 600 mm and 800 mm. The coupling reactivity measured by both the cross-correlation of reactor noise and the flux tilt methods was stronger than for the UTRs, but showed a similar trend with core spacing. The cross-correlograms were analysed using the two-node model to derive the time delays between the cores. The time delays were compared with thermal neutron wave propagation, and found to be consistent when the time delays were added to the individual node response-function delays. (author)

  19. A thermal-hydraulic test rig for advanced fast reactor fuel assemblies

    International Nuclear Information System (INIS)

    Rapier, A.C.

    1989-03-01

    A new design of fast reactor fuel assemblies has been proposed in which the pins are supported in grids attached to the wrapper by flexible skirts. Coolant mixing is enhanced by the skirts diverting flow into the cluster of pins at each grid. There are insufficient empirical data available for the detailed design of the skirt or for the input to computer calculations of flow and heat transfer. A test rig to provide these data has been designed and built. (author)

  20. Ion irradiation studies of the origins of pressurized water reactor fuel assembly deformation

    International Nuclear Information System (INIS)

    Hengstler-Eger, Rosmarie Martina

    2012-01-01

    The presented thesis studies ion irradiation damage in Zr-based alloys for pressurized water reactors to explain the origins of unexpectedly high fuel assembly growth in some plants. Transmission electron microscopy was used to investigate the effects of temperature, dose, hydrogen content of the alloy and tensile stress. A clear correlation between the stress orientation towards the crystal lattice and the density of the dislocation loops which are responsible for increased growth was found.

  1. Development of a computational program to planning and control of the IEA-R1 reactor maintenance

    International Nuclear Information System (INIS)

    Martins, Mauro Onofre; Madi Filho, Tufic

    2013-01-01

    Maintenance is an essential activity in nuclear reactors. The components of safety systems of an industrial plant should have a low probability of failure, especially if there is a high risk of accidents that may cause environmental damage. In nuclear facilities, the presence of security systems is a technical specification and a requirement for their license and operation. In order to manage the entire information flow from the maintenance of the IEA-R1, a computational program (software) was developed, which not only plans and control all the maintenance, but also updates the documents and records to safeguard the quality, ensuring the safe operation of the reactor. The software has access levels and provides detailed reports of all maintenance planned and implemented, together with an individual history of the equipment during its lifetime in the facility. This work presents all the stages of the software development, description, compatibility, application, advantages and results obtained experimentally. (author)

  2. Contact-type displacement measuring mechanism for fuel assembly in reactor

    International Nuclear Information System (INIS)

    Yokota, Yoshio; Ko, Kuniaki.

    1995-01-01

    The measuring mechanism of the present invention, which is used in a lmfbr type reactor, is suspended by a gripper of a fuel handing machine, and it comprises a combination of a displacement amount measuring jig allowed to be inserted into a handling head of a fuel assembly and a displacement amount measuring ring disposed at the lower portion in the handling head. The displacement amount measuring jig has a structure comprising a releasable handle and a columnar or cylindrical measuring portion allowable to be inserted into the handling head formed at the lower portion of the handle, which are connected with each other. When an interference (contact) occurred between the displacement amount measuring jig and the stepwise displacement amount measuring ring during the measurement, change of load and a phenomenon that the fuel handing machine can not be lowered are recognized, so that core displacement amount can be recognized based on the stroke of the gripper portion. Then, remote measurement is possible for displacement and deformation of the fuel assembly in the reactor container, and the measurement can be conducted by the same procedures and in the same period of time as in a case of ordinary fuel exchange operation. A flow channel for coolants passing through the fuel assembly can be ensured, thereby enabling to measure the amount of core displacement which is closer to an actual value in the reactor. (N.H.)

  3. On numerical simulation of fuel assembly bow in pressurized water reactors

    Energy Technology Data Exchange (ETDEWEB)

    Horváth, Ákos, E-mail: akoshorvath@t-online.hu [AREVA, AREVA NP GmbH, Paul-Gossen-Str. 100, 91052 Erlangen (Germany); Budapest University of Technology and Economics, Department of Aircraft and Ships, Stoczek Street 6, Building J, H-1111 Budapest (Hungary); Dressel, Bernd [AREVA, AREVA NP GmbH, Paul-Gossen-Str. 100, 91052 Erlangen (Germany)

    2013-12-15

    Highlights: • Simulation of fuel assembly bow by coupled CFD and finite element method. • Comparison of calculated and experimentally measured bow shapes. • Investigation of boundary condition effect on bow pattern of a fuel assembly row. • Highlighting importance of consideration of fluid–structure interaction. • Assessment of flow redistribution within the fuel assembly row model. - Abstract: Fuel assembly bow in pressurized water reactor cores is largely triggered by lateral hydraulic forces together with creep processes generated by neutron flux. A detailed understanding of the flow induced bow behaviour is, therefore, an important issue. The experimental feedbacks and laboratory tests on fuel assembly bow show that it is characterized to a high degree by fluid–structure interaction (FSI) effects, therefore, consideration of FSI is essential and indispensable in full comprehension of the bow mechanism. In the present study, coupled computational fluid dynamics (CFD) and finite element simulations are introduced, calculating fuel assembly deformation under different conditions as a quasi-stationary phenomenon. The aim has been, on the one hand, to develop such a simplified fuel assembly CFD model, which allows set up of fuel assembly rows without loosing its main hydraulic characteristic; on the other hand, to investigate the bow pattern of a given fuel assembly row under different boundary conditions. The former one has been achieved by comparing bow shapes obtained with different fuel assembly (spacer grid) modelling approaches and mesh resolutions with experimental data. In the second part of the paper a row model containing 7.5 fuel assemblies is introduced, investigating the effect of flow distribution at inlet and outlet boundary regions on fuel assembly bow behaviour. The post processing has been focused on the bow pattern, lateral hydraulic forces, and horizontal flow distribution. The results have revealed importance of consideration of

  4. Inspection and replacement of baffle assembly screws inside American reactor vessels

    International Nuclear Information System (INIS)

    Neal, K.; Chaumont, J.C.

    1999-01-01

    The baffle assembly inside the vessel of a 900 MWe reactor designed by Framatome, is made up of 44 plates fixed on 8 horizontal supports by a system of about 1000 screws. These plates undergo high neutron flux and the problem of screw cracking appeared at the end of the eighties in the first-generation reactors. The first operation on a large scale concerning the screws of a Westinghouse type reactor, was performed on the Tihange-1 power plant where Framatome controlled 960 screws and replaced 91. In 1997 as a consequence of the Belgian and French feedback experience, American plant operators launched a vast program of preventive actions: material analysis, inspection of baffle plate screws and replacement of defective screws. This program was held in cooperation with EPRI (electric power research institute) and under the control of NRC (nuclear regulatory commission). Framatome Technologies Inc (FTI) was in charge of the in-situ inspection and replacement of the screws. FTI designed special tools and equipment adapted to the 2-loop American reactors but the basis ideas were those applied on the Tihange reactor. The successful experience of FTI has allowed the firm to be commissioned for 6 2-loops American reactors. (A.C.)

  5. Advanced fuel assemblies for economic and flexible operation of light water reactors

    International Nuclear Information System (INIS)

    Urban, P.; Bender, D.

    2001-01-01

    Increasing competition in the electricity market sets up a corresponding competition between the different electricity producing technologies. This makes further improvements in the economics of nuclear power generation a vital item for the future of nuclear energy. Though the costs for development, design and fabrication of fuel assemblies contribute only about 10% to the fuel cycle costs, the design and the performance of the fuel assemblies considerably influences total electricity generation cost. By the recent creation of Framatome ANP the nuclear activities of Framatome and Siemens were combined into one company. In the past, both had made considerable achievements in the development of fuel assemblies and related services supporting the goal of safe and economic electricity generation by light water reactors. The examples described in this paper cover former Siemens products and experience. In the future, our combined experience bases will be an ideal platform to offer further substantial improvements to our customers. (author)

  6. Apparatus for removing and/or positioning fuel assemblies of a nuclear reactor

    International Nuclear Information System (INIS)

    Vuckovich, M.; Burkett, J.P.; Sallustio, J.

    1983-01-01

    Apparatus for positioning fuel assemblies of a nuclear reactor includes a control for a crane comprising a strain gauge connected to the crane line which raises and lowers the load. The signal from the strain gauge is compared with setpoints; which if the strain gauge signal exceeds a high-level setpoint, indicating that the movement of a fuel assembly is obstructed, the line drive is disabled. The line drive is also disabled if the strain gauge signal is less than a low-level setpoint, indicating that a fuel being deposited contacts the bottom of its slot or an obstruction. To preclude lateral movement of the fuel assembly suspended from the crane line, the traverse drive of the crane is disabled once the strain-gauge signal exceeds the low-level setpoint. The traverse drive can only be enabled after the strain-gauge signal is less than a slack-line setpoint. (author)

  7. Central Reactivity Measurements on Assemblies 1 and 3 of the Fast Reactor FR0

    International Nuclear Information System (INIS)

    Londen, S.O.

    1966-01-01

    The reactivity effects of small samples of various materials have been measured, by the period method at the core centre of Assemblies 1 and 3 of the fast zero power reactor FR0. For some materials the reactivity change as a function of sample size has also been determined experimentally. The core of Assembly 1 consisted only of uranium enriched to 20 % whereas the core of Assembly 3 was diluted with 30 % graphite. The results have been compared with calculated values obtained with a second-order transport-theoretical perturbation model and using differently shielded cross sections depending upon sample size. Qualitative agreement has generally been found, although discrepancies still exist. The spectrum perturbation caused by the experimental arrangement has been analyzed and found to be rather important

  8. Central Reactivity Measurements on Assemblies 1 and 3 of the Fast Reactor FR0

    Energy Technology Data Exchange (ETDEWEB)

    Londen, S O

    1966-01-15

    The reactivity effects of small samples of various materials have been measured, by the period method at the core centre of Assemblies 1 and 3 of the fast zero power reactor FR0. For some materials the reactivity change as a function of sample size has also been determined experimentally. The core of Assembly 1 consisted only of uranium enriched to 20 % whereas the core of Assembly 3 was diluted with 30 % graphite. The results have been compared with calculated values obtained with a second-order transport-theoretical perturbation model and using differently shielded cross sections depending upon sample size. Qualitative agreement has generally been found, although discrepancies still exist. The spectrum perturbation caused by the experimental arrangement has been analyzed and found to be rather important.

  9. Apparatus for removing and/or positioning fuel assemblies of a nuclear reactor

    Energy Technology Data Exchange (ETDEWEB)

    Vuckovich, M; Burkett, J P; Sallustio, J

    1981-11-30

    Apparatus for positioning fuel assemblies of a nuclear reactor includes a control for a crane comprising a strain gauge connected to the crane line which raises and lowers the load. The signal from the strain gauge is compared with setpoints; which if the strain gauge signal exceeds a high-level setpoint, indicating that the movement of a fuel assembly is obstructed, the line drive is disabled. The line drive is also disabled if the strain gauge signal is less than a low-level setpoint, indicating that a fuel being deposited contacts the bottom of its slot or an obstruction. To preclude lateral movement of the fuel assembly suspended from the crane line, the traverse drive of the crane is disabled once the strain-gauge signal exceeds the low-level setpoint. The traverse drive can only be enabled after the strain-gauge signal is less than a slack-line setpoint.

  10. Device for refueling a nuclear reactor having a core comprising a plurality of fuel assemblies

    International Nuclear Information System (INIS)

    Van Santen, A.; Elofsson, K.

    1975-01-01

    A nuclear reactor formed of fuel assemblies each including a plurality of parallel fuel rods arranged in a predetermined fuel rod lattice, which rods are freely extractable and insertable at one end of the fuel assembly, is refueled by extracting from one of the fuel assemblies a number of fuel rods substantially less than the total number of fuel rods and replacing these by inserting new fuel rods into the vacated positions. The removal and return of the rods is produced by a tool having a plurality of gripping members capable of engaging shoulders beneath heads formed on the upper ends of the fuel rods. This may be accomplished by providing a tool having a number of gripping members attached to the tool body corresponding to the lattice positions of the fuel rods to be extracted, having gripping members which can be pushed together to grip beneath shoulders on the upper ends of the fuel rods. (Official Gazette)

  11. Analysis of the rotation accident of assemblies in boiling water reactors

    International Nuclear Information System (INIS)

    Becerril-Gonzalez M, J. J.; Fuentes M, L.; Castillo M, J. A.; Ortiz S, J. J.; Perusquia de Cueto, R.

    2012-10-01

    For this work was analyzed the impact that would cause the load of a rotated fuel assembly in the behaviour of the core in the Cycle 14 of the Unit 1 of the nuclear power plant of Laguna Verde. To carry out this analysis the code Simulate-3 was used, with which was possible to analyze the behavior of the effective multiplication factor and the thermal limits (MAPRAT, MFLPD and MFLCPR). The rotation of fuel assemblies to 90, 180 and 270 grades was analyzed with regard to the design position, with 0, 1, 2 and 3 burnt cycles for these assemblies. The results show that the thermal limits remain inside the allowed values, therefore if this accident type happened the reactor could continue operating in a sure way. (Author)

  12. The approximate thermal-model-testing method for non-stationary temperature fields in central zones of fast reactor assemblies

    International Nuclear Information System (INIS)

    Mikhin, V.I.; Matukhin, N.M.

    2000-01-01

    The approach to generalization of the non-stationary heat exchange data for the central zones of the nuclear reactor fuel assemblies and the approximate thermal-model-testing criteria are proposed. The fuel assemblies of fast and water-cooled reactors with different fuel compositions have been investigated. The reason of the non-stationary heat exchange is the fuel-energy-release time dependence. (author)

  13. An analysis of fast reactor fuel assembly performance taking into account their mechanical interaction in the core and refuelling line capabilities

    International Nuclear Information System (INIS)

    Buksha, Yu.K.; Zabudko, L.M.; Kravchenko, I.N.; Matveenko, L.V.; Meshkov, M.N.

    1984-01-01

    An approach to assessment of fast reactor fuel assembly performance has been considered. A concept of passive restraint of fuel assemblies in a reactor adopted in the USSR is described. Some methods for calculating the interassembly interactions during operation are briefly outlined, some calculated results are presented. A problem of fuel assembly performance during refuelling taking into account the refuelling line capabilities is considered. Some results from fuel assemblies operation experience in the BN-600 reactor are given. (author)

  14. Control assembly materials for water reactors: Experience, performance and perspectives. Proceedings of a technical committee meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-02-01

    The safe, reliable and economic operation of water cooled nuclear power reactors depends to a large extent upon the reliable operation of control assemblies for the regulation and shutdown of the reactors. These consist of neutron absorbing materials clad in stainless steel or zirconium based alloys, guide tubes and guide cards, and other structural components. Current designs have worked extremely well in normal conditions, but less than ideal behaviour limits the lifetimes of control materials, imposing an economic penalty which acts as a strong incentive to produce improved materials and designs that are more reliable. Neutron absorbing materials currently in use include the ceramic boron carbide, the high melting point metal hafnium and the low melting point complex alloy Ag-In-Cd. Other promising neutron absorbing materials, such as dysprosium titanate, are being evaluated in the Russian Federation. These control materials exhibit widely differing mechanical, physical and chemical properties, which must be understood in order to be able to predict the behaviour of control rod assemblies. Identification of existing failure mechanisms, end of life criteria and the implications of the gradual introduction of extended burnup, mixed oxide (MOX) fuels and more complex fuel cycles constitutes the first step in a search for improved materials and designs. In the early part of this decade, it was recognized by the International Working Group on Fuel Performance and Technology (IWGFPT) that international conferences, symposia and published reviews on the materials science aspects of control assemblies were few and far between. Consequently, the IWGFPT recommended that the IAEA should rectify this situation with a series of Technical Committee meetings (TCMs) devoted entirely to the materials aspects of reactor control assemblies. The first was held in 1993 and in the intervening five years considerable progress has been made. In bringing together experts in the

  15. Control assembly materials for water reactors: Experience, performance and perspectives. Proceedings of a technical committee meeting

    International Nuclear Information System (INIS)

    2000-02-01

    The safe, reliable and economic operation of water cooled nuclear power reactors depends to a large extent upon the reliable operation of control assemblies for the regulation and shutdown of the reactors. These consist of neutron absorbing materials clad in stainless steel or zirconium based alloys, guide tubes and guide cards, and other structural components. Current designs have worked extremely well in normal conditions, but less than ideal behaviour limits the lifetimes of control materials, imposing an economic penalty which acts as a strong incentive to produce improved materials and designs that are more reliable. Neutron absorbing materials currently in use include the ceramic boron carbide, the high melting point metal hafnium and the low melting point complex alloy Ag-In-Cd. Other promising neutron absorbing materials, such as dysprosium titanate, are being evaluated in the Russian Federation. These control materials exhibit widely differing mechanical, physical and chemical properties, which must be understood in order to be able to predict the behaviour of control rod assemblies. Identification of existing failure mechanisms, end of life criteria and the implications of the gradual introduction of extended burnup, mixed oxide (MOX) fuels and more complex fuel cycles constitutes the first step in a search for improved materials and designs. In the early part of this decade, it was recognized by the International Working Group on Fuel Performance and Technology (IWGFPT) that international conferences, symposia and published reviews on the materials science aspects of control assemblies were few and far between. Consequently, the IWGFPT recommended that the IAEA should rectify this situation with a series of Technical Committee meetings (TCMs) devoted entirely to the materials aspects of reactor control assemblies. The first was held in 1993 and in the intervening five years considerable progress has been made. In bringing together experts in the

  16. Reactor

    International Nuclear Information System (INIS)

    Toyama, Masahiro; Kasai, Shigeo.

    1978-01-01

    Purpose: To provide a lmfbr type reactor wherein effusion of coolants through a loop contact portion is reduced even when fuel assemblies float up, and misloading of reactor core constituting elements is prevented thereby improving the reactor safety. Constitution: The reactor core constituents are secured in the reactor by utilizing the differential pressure between the high-pressure cooling chamber and low-pressure cooling chamber. A resistance port is formed at the upper part of a connecting pipe, and which is connect the low-pressure cooling chamber and the lower surface of the reactor core constituent. This resistance part is formed such that the internal sectional area of the connecting pipe is made larger stepwise toward the upper part, and the cylinder is formed larger so that it profiles the inner surface of the connecting pipe. (Aizawa, K.)

  17. Birth of a biome: insights into the assembly and maintenance of the Australian arid zone biota.

    Science.gov (United States)

    Byrne, M; Yeates, D K; Joseph, L; Kearney, M; Bowler, J; Williams, M A J; Cooper, S; Donnellan, S C; Keogh, J S; Leys, R; Melville, J; Murphy, D J; Porch, N; Wyrwoll, K-H

    2008-10-01

    The integration of phylogenetics, phylogeography and palaeoenvironmental studies is providing major insights into the historical forces that have shaped the Earth's biomes. Yet our present view is biased towards arctic and temperate/tropical forest regions, with very little focus on the extensive arid regions of the planet. The Australian arid zone is one of the largest desert landform systems in the world, with a unique, diverse and relatively well-studied biota. With foci on palaeoenvironmental and molecular data, we here review what is known about the assembly and maintenance of this biome in the context of its physical history, and in comparison with other mesic biomes. Aridification of Australia began in the Mid-Miocene, around 15 million years, but fully arid landforms in central Australia appeared much later, around 1-4 million years. Dated molecular phylogenies of diverse taxa show the deepest divergences of arid-adapted taxa from the Mid-Miocene, consistent with the onset of desiccation. There is evidence of arid-adapted taxa evolving from mesic-adapted ancestors, and also of speciation within the arid zone. There is no evidence for an increase in speciation rate during the Pleistocene, and most arid-zone species lineages date to the Pliocene or earlier. The last 0.8 million years have seen major fluctuations of the arid zone, with large areas covered by mobile sand dunes during glacial maxima. Some large, vagile taxa show patterns of recent expansion and migration throughout the arid zone, in parallel with the ice sheet-imposed range shifts in Northern Hemisphere taxa. Yet other taxa show high lineage diversity and strong phylogeographical structure, indicating persistence in multiple localised refugia over several glacial maxima. Similar to the Northern Hemisphere, Pleistocene range shifts have produced suture zones, creating the opportunity for diversification and speciation through hybridisation, polyploidy and parthenogenesis. This review highlights

  18. Research on reactor physics using the Very High Temperature Reactor Critical Assembly (VHTRC)

    International Nuclear Information System (INIS)

    Akino, Fujiyoshi

    1988-01-01

    The High Temperature Engineering Test Reactor (HTTR), of which the research and development are advanced by Japan Atomic Energy Research Institute, is planned to apply for the permission of installation in fiscal year 1988, and to start the construction in the latter half of fisical year 1989. As the duty of reactor physics research, the accuracy of the nuclear data is to be confirmed, the validity of the nuclear design techniques is to be inspected, and the nuclear safety of the HTTR core design is to be verified. Therefore, by using the VHTRC, the experimental data of the reactor physics quantities are acquired, such as critical mass, the reactivity worth of simulated control rods and burnable poison rods, the temperature factor of reactivity, power distribution and so on, and the experiment and analysis are advanced. The cores built up in the VHTRC so far were three kinds having different lattice forms and degrees of uranium enrichment. The calculated critical mass was smaller by 1-5 % than the measured values. As to the power distribution and the reactivity worth of burnable poison rods, the prospect of satisfying the required accuracy for the design of the HTTR core was obtained. The experiment using a new core having axially different enrichment degree is planned. (K.I.)

  19. Development of operation and maintenance technology for HTGRs by using HTTR (High Temperature engineering Test Reactor)

    Energy Technology Data Exchange (ETDEWEB)

    Shimizu, Atsushi, E-mail: shimizu.atsushi35@jaea.go.jp [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Kawamoto, Taiki [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Tochio, Daisuke [HTTR Reactor Engineering Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Saito, Kenji; Sawahata, Hiroaki; Honma, Fumitaka; Furusawa, Takayuki; Saikusa, Akio [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Takada, Shoji [HTTR Reactor Engineering Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan); Shinozaki, Masayuki [HTTR Operation Section, Department of HTTR, Oarai Research and Development Center, Japan Atomic Energy Agency, 4002 Narita-cho, Oarai-machi, Higashiibaraki-gun, Ibaraki 311-1393 (Japan)

    2014-05-01

    To establish the technical basis of HTGR (High Temperature Gas cooled Reactor), the long term high temperature operation using HTTR was carried out in the high temperature test operation mode during 50-day since January till March, 2010. It is necessary to establish the technical basis of operation and maintenance by demonstrating the stability of plant during long-term operation and the reliability of components and facilities special to HTGRs, in order to attain the stable supply of the high temperature heat to the planned heat utilization system of HTTR. Test data obtained in the operation were evaluated for the technical issues which were extracted before the operation. As the results, it was confirmed that the temperatures and flow rate of primary and secondary coolant were well controlled within sufficiently small deviation against the disturbance by the atmospheric temperature variation in daily. Stability and reliability of the components and facility special to HTGRs was demonstrated through the long term high temperature operation by evaluating the heat transfer performance of high temperature components, the stability performance of pressure control to compensate helium gas leak, the reliability of the dynamic components such as helium gas circulators, the performance of heat-up protection of radiation shielding. Through the long term high temperature operation of HTTR, the technical basis for the operation and maintenance technology of HTGRs was established.

  20. Development of operation and maintenance technology for HTGRs by using HTTR (High Temperature engineering Test Reactor)

    International Nuclear Information System (INIS)

    Shimizu, Atsushi; Kawamoto, Taiki; Tochio, Daisuke; Saito, Kenji; Sawahata, Hiroaki; Honma, Fumitaka; Furusawa, Takayuki; Saikusa, Akio; Takada, Shoji; Shinozaki, Masayuki

    2014-01-01

    To establish the technical basis of HTGR (High Temperature Gas cooled Reactor), the long term high temperature operation using HTTR was carried out in the high temperature test operation mode during 50-day since January till March, 2010. It is necessary to establish the technical basis of operation and maintenance by demonstrating the stability of plant during long-term operation and the reliability of components and facilities special to HTGRs, in order to attain the stable supply of the high temperature heat to the planned heat utilization system of HTTR. Test data obtained in the operation were evaluated for the technical issues which were extracted before the operation. As the results, it was confirmed that the temperatures and flow rate of primary and secondary coolant were well controlled within sufficiently small deviation against the disturbance by the atmospheric temperature variation in daily. Stability and reliability of the components and facility special to HTGRs was demonstrated through the long term high temperature operation by evaluating the heat transfer performance of high temperature components, the stability performance of pressure control to compensate helium gas leak, the reliability of the dynamic components such as helium gas circulators, the performance of heat-up protection of radiation shielding. Through the long term high temperature operation of HTTR, the technical basis for the operation and maintenance technology of HTGRs was established

  1. Implementation of utilities operation and maintenance experience into the European pressurized water reactor design

    International Nuclear Information System (INIS)

    Zaiss, W.; Lallier, M.

    1999-01-01

    Since 1992 Electricite de France EDF and German Utilities GU work together with Nuclear Power International NPI, a subsidiary of Framatome and Siemens, in the development of the future European Pressurized Water Reactor EPR. The EPR is an evolutionary concept, based on the French N4 plants and the German KONVOI plants. From the beginning, experienced operation and maintenance people from the precursor plants participate at the design process. Their experience will lead to a plant, which is not only characterised by low investment costs, but also by good operability, high availability and low operation and maintenance costs. No expensive back-fittings should be necessary after commissioning, to reach these availability and maintenance targets. The utility specialists give design requirements for outage performance, system design, and layout. These design requirements are really determining the system performances, and not what was design basis before. It does not necessarily lead to system increases. Mainly it is a shifting of the emphasis to other items. There are even cases, where the system performances can be reduced. Mostly very small modifications, which are nearly cost neutral when implemented early in the design, have big impact on the further operation. If there are big cost influences, a sound balance between investment and gained availability is made together with the designers. There is very fruitful discussion between designers and operators, which is highly estimated by both sides. In this frame also new, revolutionary ideas are coming up, which are going mostly in the direction of investment cost reduction, without loosing operation freedom. It is the first time in Europe, that designers and operators are working so close together. It is also the first time, that the management and the decision making is dominated by the utilities. (author)

  2. Thermal-hydraulic calculations for a fuel assembly in a European Pressurized Reactor using the RELAP5 code

    Directory of Open Access Journals (Sweden)

    Skrzypek Maciej

    2015-09-01

    Full Text Available The main object of interest was a typical fuel assembly, which constitutes a core of the nuclear reactor. The aim of the paper is to describe the phenomena and calculate thermal-hydraulic characteristic parameters in the fuel assembly for a European Pressurized Reactor (EPR. To perform thermal-hydraulic calculations, the RELAP5 code was used. This code allows to simulate steady and transient states for reactor applications. It is also an appropriate calculation tool in the event of a loss-of-coolant accident in light water reactors. The fuel assembly model with nodalization in the RELAP5 (Reactor Excursion and Leak Analysis Program code was presented. The calculations of two steady states for the fuel assembly were performed: the nominal steady-state conditions and the coolant flow rate decreased to 60% of the nominal EPR flow rate. The calculation for one transient state for a linearly decreasing flow rate of coolant was simulated until a new level was stabilized and SCRAM occurred. To check the correctness of the obtained results, the authors compared them against the reactor technical documentation available in the bibliography. The obtained results concerning steady states nearly match the design data. The hypothetical transient showed the importance of the need for correct cooling in the reactor during occurrences exceeding normal operation. The performed analysis indicated consequences of the coolant flow rate limitations during the reactor operation.

  3. Completion of the fabrication and assembly of the internal parts and pressure vessel of the LABGENE reactor

    International Nuclear Information System (INIS)

    Guimaraes, Leonam dos Santos

    2005-01-01

    The Navy's Technological Center in Sao Paulo (CTMSP) has successfully concluded in 2005 the final assembly of the internals of the Laboratory of Energy Generation's Reactor (LABGENE). This structure together with the fuel elements and the control rods drives mechanisms are part of a PWR type Nuclear Reactor. (author)

  4. Development and Field Application Experience of the Reactor Internal Preventive Maintenance Technology

    International Nuclear Information System (INIS)

    Kanno, A.; Yoshikubo, F.; Morinaka, R.; Tanaka, M.; Hasegawa, K.; Hatou, H.

    2012-01-01

    A reactor internal preventive maintenance technology, Water Jet Peening (WJP), has been developed as a stress corrosion cracking (SCC) mitigation technology that has been successfully implemented during refuelling outages at 15 Boiling Water Reactors (BWR) and three (3) Advanced BWRs (during the site construction and in the shop fabrication) in Japan. WJP is one of the most successful underwater peening methods, which utilizes the energy generated from the collapsing of bubbles produced by the cavitating water jet nozzle. The energy produced from the cavitations introduces compressive residual stress on the metal surface and subsurface up to a depth of several hundred micrometers. Most recently, we have successfully applied WJP to the bottom head components and to some cracked areas on the shroud support in the Tokai-2 plant. In the case of the bottom head components, we produced inspection and repair tooling as a contingency in the event SCC was identified and would be required to be repaired prior to the implementation of WJP. (author)

  5. Public acceptance of fusion energy and scientific feasibility of a fusion reactor. DREAM (DRastically EAsy Maintenance) tokamak

    International Nuclear Information System (INIS)

    Nishio, Satoshi

    1998-01-01

    If the major part of the electric power demand will be supplied by tokamak fusion power plants, a suitable tokamak reactor must be an ultimate goal, i.e., the reactor must be excellent both in terms of construction cost and safety aspects including operation availability (maintainability and reliability). In attaining this goal, an approach focusing on both safety and availability (including reliability and maintainability) issues is the most promising strategy. The tokamak reactor concept with a very high aspect ratio configuration and SiC/SiC composite structural materials is compatible with this approach, which is called the DREAM (DRastically EAsy Maintenance) approach. The SiC/SiC composite is a low activation material and an insulation material, and the high aspect ratio configuration leads to good accessibility for the maintenance of machines. As an intermediate steps between an experimental reactor such as ITER and the ultimate goal, the development of prototype reactor which demonstrates electric power generation and an initial-phase commercial reactor which demonstrates for COE (cost of electricity) competitiveness has been investigated. Especially for the prototype reactor, material and technological immaturity must be considered. (J.P.N.)

  6. Examination process of a nuclear reactor fuel assembly and examination machine to bring the process into operation

    International Nuclear Information System (INIS)

    Delaroche, P.; Leseur, A.; Saglio, R.; Vaubert, Y.

    1983-01-01

    The machine to examine a fuel assembly of a nuclear reactor includes a support on which the assembly to be examined is placed, a source emitting waves, directed to the assembly to be examined, devices to examine the assembly to be examined that receive the emitted wave by the said source and that have been reflected by the assembly. The examination devices have an axis, this axis being directed to a mirror, this mirror being inclined in such a way that it reflects the waves reflected by the assembly to the examination devices, a radiation protection, to avoid the radiation emitted by the assembly, being diposed between the assembly and the examination devices [fr

  7. The Conceptual Design for Tubular Fuel Assemblies of an Advanced Research Reactor

    International Nuclear Information System (INIS)

    Ryu, Jeong Soo; Dan, Ho Jin; Cho, Yeong Garp; Yoon, Doo Byung; Park, Cheol

    2005-05-01

    An Advanced Research Reactor(ARR) is being designed by KAERI since 2002. The final goal of the project is to develop a new and unique research reactor model which is superior in safety and economical aspects. In this work, the conceptual design for tubular fuel assemblies was carried out to enhance the previous model. The shape optimization of the cross section of the top guide was performed, and the swaging procedure in connecting fuel plates and stiffeners was developed. Moreover to reflect changes in number and size of fuel plates, related parts of the standard and the reduced fuel assemblies were redesigned. The top guide should suppress the vibration of the fuel assembly due to coolant and resist against material failures owing to fatigue and yield. In order to gain these design requirements, we have optimized the section profile of the top guide. To confirm manufacturing aspects, the swaging procedure was developed and its performance was tested. The results of tangential tensile test and axial compression test guaranteed that the fixing state between fuel plates and stiffeners is firm enough to hold each other. In addition, due to changes in number and size of fuel plates, the outer cross section of the fuel assembly was expanded and the diameter of the spacer tube was reduced. Reflecting these design changes, top/bottom guide, top guide cover, spring, spring cover, and receptacle were readjusted. Based on the technical experiences on the design and operation of the HANARO, the standard and the reduced fuel assemblies will be verified by performing various tests and analysis

  8. Evaluation of radiation exposures to personnel during maintenance operations and fuel recharging at NPP with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Beskrestnov, N.V.; Vasil'ev, Eh.S.; Kozlov, V.F.; Odinokov, Yu.Yu.; Romanov, V.P.; Tsypin, S.G.

    1983-01-01

    A unified data acquisition and analysis system is presented. The system is intended to assess radiation exposures to personnel and perform radiation monitoring during periodic maintenance operations sna fuel recharging at NPPs with WWER-440 reactors. The basic principles of developing this system, patterns of danita collection are considered, points of radiation motoring chosen with account of the NPP operating experience are pointed out

  9. Basic policy of maintenance for the power conversion system of the gas turbine high temperature reactor 300 (GTHTR300)

    International Nuclear Information System (INIS)

    Kosugiyama, Shinichi; Takizuka, Takakazu; Kunitomi, Kazuhiko; Yan, Xing; Katanishi, Shoji; Takada, Shoji

    2003-01-01

    Basic policy of maintenance was determined for major equipment in the power conversion system of the Gas Turbine High Temperature Reactor 300 (GTHTR300). It was developed based on the current maintenance practice in Light Water Reactors (LWRs), High Temperature Engineering Test Reactor (HTTR) and conventional combined cycle power plants while taking into account of unique design features of GTHTR300. First, potential degradation phenomena in operations were identified and corresponding maintenance approaches were proposed for the equipment. Such degradations encountered typically in LWRs as corrosion, erosion and stress corrosion cracking are unlikely to occur since the working fluid of GTHTR300 is inert helium. Main causes of the degradations are high operating temperature and pressure. The gas turbine, compressor, generator, control valves undergo opening and dismantling maintenance in a suitable time interval. The power conversion vessel, heat exchanger vessel, primary system piping and heat exchanging tubes of precooler are subjected to in-service inspections similar to those done in LWRs. As turbine blades represent the severest material degradation because of their high-temperature and high-stress operating conditions, a lifetime management scheme was suggested for them. The longest interval of open-casing maintenance of the gas turbine is estimated to be six to seven years from technical point of view. Present study is entrusted from the Ministry of Education, Culture, Sports, Science and Technology of Japan. (author)

  10. Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system

    International Nuclear Information System (INIS)

    Trinh Dinh Hai; Nguyen Thanh Cuong; Huynh Ton Nghiem; Phan Quoc Minh; Nguyen Duc Tuan; Nguyen Nhi Dien

    2004-01-01

    From 1/2002 to 12/2003, we implemented successfully a project, entitled 'Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system' under the assistance of the Ministry of Science and Technology. Its main results such as Testing Apparatus based on microcontroller for all functional boards of the Control Logic System of the Reactor Control System (RCS). Technical support CD - ROM for Process Instrumentation System, software for logging automatically information from important systems of the RCS through LAN, program for failure management of Process Instrumentation System have been playing an important role for observation, operation support, maintenance of the RCS. Through this project, the implementation group has grown up rapidly. The control and instrumentation group has been provided with some modern equipment, electronic components, and materials for maintenance work and research development in the years to come. This paper presents typical results and discussions. (author)

  11. Application of assembly module to high-temperature gas-cooled reactor full-scope simulation system

    International Nuclear Information System (INIS)

    Li Sifeng; Li Fu; Ma Yuanle; Shi Lei

    2007-01-01

    According to the circumstances that exist in the reactor full-scope simulators development as long development cycle, very difficult upgrade and narrow range of applicability, a kind of new model was developed based on assembly module which root in Linux kernel and successfully applied to the design of high-temperature gas-cooled reactor full-scope simulator system. The simulation results are coincident with the experimental ones, and it indicates that the new model based on assembly module is feasible to design of high-temperature gas cooled reactor simulation system. (authors)

  12. Seals in nuclear reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The aim of this invention is the provision of improved seals for reactor vessels in which fuel assemblies are located together with inlets and outlets for the circulation of a coolant. The object is to provide a seal arrangement for the rotatable plugs of nuclear reactor closure heads which has good sealing capacities over a wide gap during operation of the reactor but which also permits uninhibited rotation of the plugs for maintenance. (U.K.)

  13. Feasibility review for the fabrication aspects of SMART reactor vessel assembly

    International Nuclear Information System (INIS)

    Kim, K. S.; Choi, S.; Kim, T. W.; Jeong, K. H.; Lee, G. M.; Park, K. B.; Chang, M. H.

    1999-06-01

    In this report, the design functions and requirements for the major components of 330 MWt integral reactor, SMART (System-integrated Modular Advanced ReacTor), are described. The feasibility of major components, the assemblage sequence, and the anticipated difficulties during manufacturing and assemblage are discussed. Also developed are the maintenance and replacement strategy. In addition, the material requirements, welding requirements, the concerns of casting and forging, and the feasibility of procurement of items which are not easily available domestically are reviewed. The contents of this report will be reflected throughout the basic design stage of the SMART, and is expected to serve as the basic reference for the SMART prototype fabrication. (author). 61 figs

  14. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VII Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities.

  15. Experience on Maintenance of Thai Research Reactor's 'Small-Section' Pool

    International Nuclear Information System (INIS)

    Tippayakul, Chanatip

    2013-01-01

    The reactor pool of TRR-1/M1 has been used since 1962 when the reactor building was constructed. Periodic maintenance of the reactor pool has been conducted by cleaning the pool surface and re-painting with epoxy coating. The TRR-1/M1 pool basically consists of two sections referred as 'large-section' and 'small-section'. The latest re-painting activity of the 'large-section' pool was performed in 2006 but the 'small-section' pool had not been re-painted for more than 10 years. Therefore, to assure that the 'small-section' pool can maintain leak-proof condition, the re-painting of the 'small-section' pool was performed in the early 2012. A project team was organized specially for this project and a detailed execution plan was developed. The project activities include removing foreign objects and highly activated materials from the pool section, cleaning, inspecting, re-painting the pool surface and testing for water leaks. Preparation of the repainting activities had begun 2 years in advance. During the time, the reactor core had been relocated to operate in the large-section pool away from the working area in order to minimize radioactivity. The challenge of this project was to handle 4 sets of highly radioactive bolts and nuts which support the weight of the 'void tank' irradiation facility. These bolts and nuts were made from stainless steel and had been in the flux region since the installation of the 'void tank' irradiation facility approximately 30 years ago. Dose rate measurement at the contacts of these bolts and nuts were found to be in the range of 10 . 20 R/hr. The strategy to minimize the dose rate of the workers to conduct the pool repainting in the area was to remove the bolts and nuts and replace with new ones before entering the area. Special tools were improvised in order to remove the bolts and nuts under water. During the execution of the project, close radiation monitoring was performed by the radiation protection team. The project was conducted

  16. Examination of a failed reactor coolant pump rotating assembly from Crystal River Unit 3

    International Nuclear Information System (INIS)

    Hayner, G.O.; Lubnow, T.; Clary, M.

    1990-01-01

    On January 18, 1989, the A reactor coolant pump rotating assembly at the Crystal River Unit 3 Nuclear Power Plant failed during operation. A rotating assembly from this pump had previously failed in 1986. The reactor coolant pump was fabricated by Byron Jackson Pump Division of Borg-Warner Ind. Products, Inc. from UNS S66286 superalloy (Alloy A286). A root cause failure analysis examination was performed on the pump shaft and other components. The failure analysis included shaft vibrational mode and stress analyses, pump clearance and alignment analyses, and detailed destructive examination of the shaft and hydrostatic bearing assemblies. Based on the detailed physical examination of the shaft it was concluded that cracks initiated in the pump shaft at two sites approximately 180 0 apart in a band of shallow, thermally induced fatigue cracks. The cracks initiated at the bottom edge of the motor end shrink fit pad under the shrink fit sleeve supporting the hydrostatic bearing journal. The band of thermally induced fatigue cracks was apparently caused by mixing of cold seal injection water and hot reactor coolant in gaps between the pump shaft and sleeve. The motor end shrink fit was apparently not effective in preventing introduction of the seal injection water to this area. Initial crack propagation occurred by fatigue due to lateral vibration; however, the majority of crack propagation occurred by abnormal torsional fatigue loading induced by contact and sticking between the rotating and stationary portions of the hydrostatic bearing. Final fracture of the shaft occurred by torsional overload. Metallurgical characteristics and mechanical properties of the shaft were within design specification and probably did not significantly influence the cracking process

  17. Experimental studies of flow induced vibrations of the fuel assembly for the PEC reactor

    International Nuclear Information System (INIS)

    Pitimada, D.; Presaghi, M.; Tampone, O.; Cesari, F.

    1977-01-01

    The vibration behaviour of an assembly of seven mock-up fuel bundles of PEC reactor has been investigated. The assembly was excited by a parallel flow of water simulating sodium. The motion of the group (or of a single bundle in the group) has been measured in transverse sections detecting two orthogonal components of displacement. During the experiences the following parameters were varied: bundle foot and pads restraints, flow rate condition, coolant flow outlet conditions at the head of fuel bundles. Experimental data were processed in order to obtain: trajectories of three points of fuel bundle axis, power density spectra of measured vibration amplitudes, correlations between coolant flow rate and vibration amplitude R.M.S. (author)

  18. Model for determining stresses in the structure of a fast reactor fuel assembly

    International Nuclear Information System (INIS)

    Kervevan, J.-J.

    1974-01-01

    Deformations in a reactor core are due to two metallurgical phenomena, swelling of the steel under irradiation and irradiation creep when the structure is under stress. The first step is to determine the deformation of each sub-assembly supposed free, subjected to a neutron flux or temperature gradient, and the second is to study the interactions amongst most of the sub-assemblies. Under the influence of the deformations the interaction value will change with time, and this development must be determined. Calculation methods were developed for the purpose. A number of computing codes already exist and it is necessary to complete them, modify them if necessary, create new ones as the case arises and form a coherent whole [fr

  19. Artificial neural networks for spatial distribution of fuel assemblies in reload of PWR reactors

    International Nuclear Information System (INIS)

    Oliveira, Edyene; Castro, Victor F.; Velásquez, Carlos E.; Pereira, Claubia

    2017-01-01

    An artificial neural network methodology is being developed in order to find an optimum spatial distribution of the fuel assemblies in a nuclear reactor core during reload. The main bounding parameter of the modelling was the neutron multiplication factor, k ef f . The characteristics of the network are defined by the nuclear parameters: cycle, burnup, enrichment, fuel type, and average power peak of each element. These parameters were obtained by the ORNL nuclear code package SCALE6.0. As for the artificial neural network, the ANN Feedforward Multi L ayer P erceptron with various layers and neurons were constructed. Three algorithms were used and tested: LM (Levenberg-Marquardt), SCG (Scaled Conjugate Gradient) and BayR (Bayesian Regularization). Artificial neural network have implemented using MATLAB 2015a version. As preliminary results, the spatial distribution of the fuel assemblies in the core using a neural network was slightly better than the standard core. (author)

  20. A porous medium model for predicting the duct wall temperature of sodium fast reactor fuel assembly

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Yiqi, E-mail: yyu@anl.gov [Nuclear Engineering Division, Argonne National Laboratory, Lemont, IL 60439 (United States); Merzari, Elia; Obabko, Aleksandr [Mathematics and Computer Science Division, Argonne National Laboratory, Lemont, IL 60439 (United States); Thomas, Justin [Nuclear Engineering Division, Argonne National Laboratory, Lemont, IL 60439 (United States)

    2015-12-15

    Highlights: • The proposed models are 400 times less computationally expensive than CFD simulations. • The proposed models show good duct wall temperature agreement with CFD simulations. • The paper provides an efficient tool for coupled radial core expansion calculation. - Abstract: Porous medium models have been established for predicting duct wall temperature of sodium fast reactor rod bundle assembly, which is much less computationally expensive than conventional CFD simulations that explicitly represent the wire-wrap and fuel pin geometry. Three porous medium models are proposed in this paper. Porous medium model 1 takes the whole assembly as one porous medium of uniform characteristics in the conventional approach. Porous medium model 2 distinguishes the pins along the assembly's edge from those in the interior with two distinct regions, each with a distinct porosity, resistance, and volumetric heat source. This accounts for the different fuel-to-coolant volume ratio in the two regions, which is important for predicting the temperature of the assembly's exterior duct wall. In Porous medium model 3, a precise resistance distribution was employed to define the characteristic of the porous medium. The results show that both porous medium model 2 and 3 can capture the average duct wall temperature well. Furthermore, the local duct wall variations due to different sub-channel patterns in bare rod bundles are well captured by porous medium model 3, although the wire effect on the duct wall temperature in wire wrap rod bundle has not been fully reproduced yet.

  1. On the mixing model for calculating the temperature fields in nuclear reactor fuel assemblies

    International Nuclear Information System (INIS)

    Mikhin, V.I.; Zhukov, A.V.

    1985-01-01

    One of the alternatives of the mixing model applied for calculating temperature fields in nuclear reactor fuel assemblies,including the fuel assemblies with nonequilibrium energy-release in fuel element cross section, is consistently described. The equations for both constant and variable values of coolant density and heat capacity are obtained. The mixing model is based on a set of mass, heat and longitudinal momentum balance equations. This set is closed by the ratios connecting the unknown values for gaps between fuel elements with the averaged values for neighbouring channels. The ratios to close momentum and heat balance equations, explaining, in particular, the nonequivalent heat and mass, momentum and mass transfer coefficients, are suggested. The balance equations with variable coolant density and heat capacity are reduced to the form coinciding with those of the similar equations with constant values of these parameters. Application of one of the main ratios of the mixing model relating the coolant transverse overflow in the gaps between fuel elements to the averaged coolant rates (flow rates) in the neighbouring channels is mainly limited by the coolant stabilized flow in the fuel assemblies with regular symmetrical arrangement of elements. Mass transfer coefficients for these elements are experimentally determined. The ratio in the paper is also applicable for calculation of fuel assembly temperature fields with a small relative shift of elements

  2. Structural characteristics of a graphite moderated critical assembly for a Zero Power reactor at IEA (Brazil)

    International Nuclear Information System (INIS)

    Almeida Ferreira, A.C. de; Hukai, R.Y.

    1975-01-01

    The structural characteristics of a graphite moderated core of a critical assembly to be installed in the Zero Power Reactor of IEA have been defined. These characteristics are the graphite block dimensions, the number and dimensions of the holes in the graphite, the pitch, the dimensions of the sticks of fuel and graphite to be inserted in the holes, and the mechanical reproducibility of the system. The composition of the fuel and moderator sticks were also defined. The main boundary conditions were the range of the relation C/U and C/TH used in commercial HTGR and the neutronics homogeneity

  3. Methods of assembling and disassembling spider and burnable poison rod structures for nuclear reactors

    International Nuclear Information System (INIS)

    Edwards, G.T.; Schluderberg, D.C.

    1981-01-01

    A technique is provided for engaging and disengaging burnable poison rods from a spider in a nuclear reactor fuel assembly. A cap on the end of each of the burnable poison rods is provided with a shank or stem that is received in a respective bore formed in the spider. A frangible flange secures the shank and rod to the spider. Pressing the shank in the direction of the bore axis by means, e.g., of a plate ruptures the frangible flange to release the rod from the spider. (author)

  4. Reactor laboratory course for students majoring in nuclear engineering with the Kyoto University Critical Assembly (KUCA)

    International Nuclear Information System (INIS)

    Nishihara, H.; Shiroya, S.; Kanda, K.

    1996-01-01

    With the use of the Kyoto University Critical Assembly (KUCA), a joint reactor laboratory course of graduate level is offered every summer since 1975 by nine associated Japanese universities (Hokkaido University, Tohoku University, Tokyo Institute of Technology, Musashi Institute of Technology, Tokai University, Nagoya University, Osaka University, Kobe University of Mercantile Marine and Kyushu University) in addition to a reactor laboratory course of undergraduate level for Kyoto University. These courses are opened for three weeks (two weeks for the joint course and one week for the undergraduate course) to students majoring in nuclear engineering and a total of 1,360 students have taken the course in the last 21 years. The joint course has been institutionalized with the background that it is extremely difficult for a single university in Japan to have her own research or training reactor. By their effort, the united faculty team of the joint course have succeeded in giving an effective, unique one-week course, taking advantage of their collaboration. Last year, an enquete (questionnaire survey) was conducted to survey the needs for the educational experiments of graduate level and precious data have been obtained for promoting reactor laboratory courses. (author)

  5. Research on the reactor physics using the Kyoto University Critical Assembly (KUCA)

    International Nuclear Information System (INIS)

    1986-10-01

    The Kyoto University Critical Assembly [KUCA] is a multi-core type critical assembly established in 1974, as a facility for the joint use study by researchers of all universities in Japan. Thereafter, many reactor physics experiments have been carried out using three cores (A-, B-, and C-cores) in the KUCA. In the A- and B-cores, solid moderator such as polyethylene or graphite is used, whereas light-water is utilized as moderator in the C-core. The A-core has been employed mainly in connection with the Cockcroft-Walton type accelerator installed in the KUCA, to measure (1) the subcriticality by the pulsed neutron technique for the critical safety research and (2) the neutron spectrum by the time-of-flight technique. Recently, a basic study on the tight lattice core has also launched using the A-core. The B-core has been employed for the research on the thorium fuel cycle ever since. The C-core has been employed (1) for the basic studies on the nuclear characteristics of light-water moderated high-flux research reactors, including coupled-cores, and (2) for a research related to reducing enrichment of uranium fuel used in research reactors. The C-core is being utilized in the reactor laboratory course experiment for students of ten universities in Japan. The data base of the KUCA critical experiments is generated so far on the basis of approximately 350 experimental reports accumulated in the KUCA. Besides, the assessed KUCA code system has been established through analyses on the various KUCA experiments. In addition to the KUCA itself, both of them are provided for the joint use study by researchers of all universities in Japan. (author)

  6. Assessment and management of ageing of major nuclear power plant components important to safety: CANDU reactor assemblies

    International Nuclear Information System (INIS)

    2001-02-01

    At present, there are over four hundred operational nuclear power plants (NPPs) in IAEA Member States. Operating experience has shown that ineffective control of the ageing degradation of the major NPP components (e.g. caused by unanticipated phenomena and by operating, maintenance, design or manufacturing errors) can jeopardize plant safety and also plant life. Ageing in these NPPs must therefore be effectively managed to ensure the availability of design functions throughout the plant service life. From the safety perspective, this means controlling within acceptable limits the ageing degradation and wearout of plant components important to safety so that adequate safety margins remain, i.e. integrity and functional capability in excess of normal operating requirements. This TECDOC is one in a series of reports on the assessment and management of ageing of the major NPP components important to safety. The reports are based on experience and practices of NPP operators, regulators, designers, manufacturers, and technical support organizations and a widely accepted Methodology for the Management of Ageing of NPP Components Important to Safety which was issued by the IAEA in 1992. The current practices for the assessment of safety margins (fitness for service) and the inspection, monitoring, and mitigation of ageing degradation of selected components of Canada deuterium-uranium (CANDU) reactors, boiling water reactors (BWRs), pressurized water reactors (PWRs) including the Soviet designed water moderated and water cooled energy reactors (WWERs), are documented in the reports. These practices are intended to help all involved directly and indirectly in ensuring the safe operation of NPPs and also to provide a common technical basis for dialogue between plant operators and regulators when dealing with age-related licensing issues. Since the reports are written from a safety perspective, they do not address life or life-cycle management of the plant components, which

  7. Verification of spectral burn-up codes on 2D fuel assemblies of the GFR demonstrator ALLEGRO reactor

    International Nuclear Information System (INIS)

    Čerba, Štefan; Vrban, Branislav; Lüley, Jakub; Dařílek, Petr; Zajac, Radoslav; Nečas, Vladimír; Haščik, Ján

    2014-01-01

    Highlights: • Verification of the MCNPX, HELIOS and SCALE codes. • MOX and ceramic fuel assembly. • Gas-cooled fast reactor. • Burnup calculation. - Abstract: The gas-cooled fast reactor, which is one of the six GEN IV reactor concepts, is characterized by high operational temperatures and a hard neutron spectrum. The utilization of commonly used spectral codes, developed mainly for LWR reactors operated in the thermal/epithermal neutron spectrum, may be connected with systematic deviations since the main development effort of these codes has been focused on the thermal part of the neutron spectrum. To be able to carry out proper calculations for fast systems the used codes have to account for neutron resonances including the self-shielding effect. The presented study aims at verifying the spectral HELIOS, MCNPX and SCALE codes on the basis of depletion calculations of 2D MOX and ceramic fuel assemblies of the ALLEGRO gas-cooled fast reactor demonstrator in infinite lattice

  8. Application of software quality assurance methods in validation and maintenance of reactor analysis computer codes

    International Nuclear Information System (INIS)

    Reznik, L.

    1994-01-01

    Various computer codes employed at Israel Electricity Company for preliminary reactor design analysis and fuel cycle scoping calculations have been often subject to program source modifications. Although most changes were due to computer or operating system compatibility problems, a number of significant modifications were due to model improvement and enhancements of algorithm efficiency and accuracy. With growing acceptance of software quality assurance requirements and methods, a program of implementing extensive testing of modified software has been adopted within the regular maintenance activities. In this work survey has been performed of various software quality assurance methods of software testing which belong mainly to the two major categories of implementation ('white box') and specification-based ('black box') testing. The results of this survey exhibits a clear preference of specification-based testing. In particular the equivalence class partitioning method and the boundary value method have been selected as especially suitable functional methods for testing reactor analysis codes.A separate study of software quality assurance methods and techniques has been performed in this work objective to establish appropriate pre-test software specification methods. Two methods of software analysis and specification have been selected as the most suitable for this purpose: The method of data flow diagrams has been shown to be particularly valuable for performing the functional/procedural software specification while the entities - relationship diagrams has been approved to be efficient for specifying software data/information domain. Feasibility of these two methods has been analyzed in particular for software uncertainty analysis and overall code accuracy estimation. (author). 14 refs

  9. Experience in the recruitment, organization and training of operations and maintenance personnel for the Malaysian research reactor

    International Nuclear Information System (INIS)

    Jamal Khair Ibrahim.

    1983-01-01

    The TRIGA Reactor located at the Tun Ismail Atomic Research Centre (PUSPATI) Complex is owned and operated by the Nuclear Energy Unit of the Prime Minster's Department. The operations and maintenance personnel are part and parcel of the national civil service organization. As such, the requirement and remuneration of these personnel are handled by a central federal government personnel management agency in common with personnel from other federal government agencies. In addition, the reactor is the first and only one in Malaysia, a developing country, which is the process of committing herself towards a nuclear power programme. These factors coupled with the absence of an independent reactor operator licensing agency posed unique problems in the recruitment, organization, training and licensing of operations personnel for the facility. The paper discusses these factors and their bearing on the recruitment, training, licensing and career development prospects of the PUSPATI TRIGA Reactor operators. (author)

  10. Drop performance test of conceptually designed control rod assembly for prototype generation IV sodium-cooled fast reactor

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Young Kyu; Lee, Jae Han; Kim, Hoe Woong; KIm, Sung Kyun; Kim, Jong Bum [Sodium-cooled Fast Reactor NSSS Design Division, Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2017-06-15

    The control rod assembly controls reactor power by adjusting its position during normal operation and shuts down chain reactions by its free drop under scram conditions. Therefore, the drop performance of the control rod assembly is important for the safety of a nuclear reactor. In this study, the drop performance of the conceptually designed control rod assembly for the prototype generation IV sodium-cooled fast reactor that is being developed at the Korea Atomic Energy Research Institute as a next-generation nuclear reactor was experimentally investigated. For the performance test, the test facility and test procedure were established first, and several free drop performance tests of the control rod assembly under different flow rate conditions were then carried out. Moreover, performance tests under several types and magnitudes of seismic loading conditions were also conducted to investigate the effects of seismic loading on the drop performance of the control rod assembly. The drop time of the conceptually designed control rod assembly for 0% of the tentatively designed flow rate was measured to be 1.527 seconds, and this agrees well with the analytically calculated drop time. It was also observed that the effect of seismic loading on the drop time was not significant.

  11. Benchmark exercise for fluid flow simulations in a liquid metal fast reactor fuel assembly

    Energy Technology Data Exchange (ETDEWEB)

    Merzari, E., E-mail: emerzari@anl.gov [Mathematics and Computer Science Division, Argonne National Laboratory, 9700 S. Cass Avenue, Lemont, IL 60439 (United States); Fischer, P. [Mathematics and Computer Science Division, Argonne National Laboratory, 9700 S. Cass Avenue, Lemont, IL 60439 (United States); Yuan, H. [Nuclear Engineering Division, Argonne National Laboratory, Lemont, IL (United States); Van Tichelen, K.; Keijers, S. [SCK-CEN, Boeretang 200, Mol (Belgium); De Ridder, J.; Degroote, J.; Vierendeels, J. [Ghent University, Ghent (Belgium); Doolaard, H.; Gopala, V.R.; Roelofs, F. [NRG, Petten (Netherlands)

    2016-03-15

    Highlights: • A EUROTAM-US INERI consortium has performed a benchmark exercise related to fast reactor assembly simulations. • LES calculations for a wire-wrapped rod bundle are compared with RANS calculations. • Results show good agreement for velocity and cross flows. - Abstract: As part of a U.S. Department of Energy International Nuclear Energy Research Initiative (I-NERI), Argonne National Laboratory (Argonne) is collaborating with the Dutch Nuclear Research and consultancy Group (NRG), the Belgian Nuclear Research Centre (SCK·CEN), and Ghent University (UGent) in Belgium to perform and compare a series of fuel-pin-bundle calculations representative of a fast reactor core. A wire-wrapped fuel bundle is a complex configuration for which little data is available for verification and validation of new simulation tools. UGent and NRG performed their simulations with commercially available computational fluid dynamics (CFD) codes. The high-fidelity Argonne large-eddy simulations were performed with Nek5000, used for CFD in the Simulation-based High-efficiency Advanced Reactor Prototyping (SHARP) suite. SHARP is a versatile tool that is being developed to model the core of a wide variety of reactor types under various scenarios. It is intended both to serve as a surrogate for physical experiments and to provide insight into experimental results. Comparison of the results obtained by the different participants with the reference Nek5000 results shows good agreement, especially for the cross-flow data. The comparison also helps highlight issues with current modeling approaches. The results of the study will be valuable in the design and licensing process of MYRRHA, a flexible fast research reactor under design at SCK·CEN that features wire-wrapped fuel bundles cooled by lead-bismuth eutectic.

  12. In-operation inspection technology development 'development of a rational maintenance management method for light-water reactor plant'

    International Nuclear Information System (INIS)

    Matsumoto, K.; Sanoh, J.; Uhara, Y.; Takeshima, K.; Tani, M.; O'Shima, E.

    2001-01-01

    In 1985, the Japanese national project named 'In-Operation Inspection Technology Development (IOI)' was initiated, as a part of the activities for advancing the LWR(light water reactor)technology in Japan. This project developed the techniques for in-operation monitoring and detecting of early anomalies of nuclear power equipment such as rotating machines, valves and piping. Further, the estimation systems for diagnosing and predicting a degradation rate of these items of equipment were constructed. Based on these results, a new maintenance management technology was constructed. This paper describes the outline of the new maintenance management concept. (authors)

  13. Evaluation of maintenance strategies for steam generator tubes in pressurized waster reactors. 2. Cost and profitability analyses

    International Nuclear Information System (INIS)

    Isobe, Y.; Sagisaka, M.; Yoshimura, S.; Yagawa, G.

    2000-01-01

    As an application of probabilistic fracture mechanics (PFM), risk-benefit analysis was carried out to evaluate maintenance activities of steam generator (SG) tubes used in pressurized water reactors (PWRs). The analysis was conducted for SG tubes made of Inconel 600, and Inconel 690 as well assuming its crack initiation and crack propagation law based on Inconel 600 data. The following results were drawn from the analysis. Improvement of inspection accuracy reduces the maintenance costs significantly and is preferable from the viewpoint of profitability due to reduction of SG tube leakage and rupture. There is a certain region of SCC properties of SG tubes where sampling inspection is effective. (author)

  14. Nuclear pore complex assembly and maintenance in POM121- and gp210-deficient cells

    DEFF Research Database (Denmark)

    Stavru, Fabrizia; Nautrup-Pedersen, Gitte; Cordes, Volker C

    2006-01-01

    So far, POM121 and gp210 are the only known anchoring sites of vertebrate nuclear pore complexes (NPCs) within the lipid bilayer of the nuclear envelope (NE) and, thus, are excellent candidates for initiating the NPC assembly process. Indeed, we demonstrate that POM121 can recruit several...... as depletion of POM121 from human fibroblasts, which do not express gp210, further suggest that NPCs can assemble or at least persist in a POM121- and gp210-free form. This points to extensive redundancies in protein-protein interactions within NPCs and suggests that vertebrate NPCs contain additional membrane...

  15. Analyses for inserting fresh LEU fuel assemblies instead of fresh HEU fuel assemblies in the Dalat Nuclear Research Reactor in Vietnam

    International Nuclear Information System (INIS)

    Hanan, N. A.; Deen, J.R.; Matos, J.E.

    2005-01-01

    Analyses were performed by the RERTR Program to replace 36 burned HEU (36%) fuel assemblies in the Dalat Nuclear Research Reactor in Vietnam with either 36 fresh fuel assemblies currently on-hand at the reactor or with LEU fuel assemblies to be procured. The study concludes that the current HEU (36%) WWR-M2 fuel assemblies can be replaced with LEU WWR-M2 fuel assemblies that are fully-qualified and have been commercially available since 2001 from the Novosibirsk Chemical Concentrates Plant in Russia. The current reactor configuration using re-shuffled HEU fuel began in June 2004 and is expected to allow normal operation until around August 2006. If 36 HEU assemblies each with 40.2 g 235 U are inserted without fuel shuffling over the next five operating cycles, the core could operate for an additional 10 years until June 2016. Alternatively, inserting 36 LEU fuel assemblies each containing 49.7 g 235 U without fuel shuffling over five operating cycles would allow normal operation for about 14 years from August 2006 until October 2020. The main reason for the longer service life of the LEU fuel is that its 235 U content is higher than the 235 U content needed simply to match the service life of the HEU fuel. Fast neutron fluxes in the experiment regions would be very nearly the same in both the HEU and LEU cores. Thermal neutron fluxes in the experiment regions would be lower by 1-5%, depending on the experiment type and location. (author)

  16. Destruction of plutonium using non-uranium fuels in pressurized water reactor peripheral assemblies

    International Nuclear Information System (INIS)

    Chodak, P. III

    1996-05-01

    This thesis examines and confirms the feasibility of using non-uranium fuel in a pressurized water reactor (PWR) radial blanket to eliminate plutonium of both weapons and civilian origin. In the equilibrium cycle, the periphery of the PWR is loaded with alternating fresh and once burned non-uranium fuel assemblies, with the interior of the core comprised of conventional three batch UO 2 assemblies. Plutonium throughput is such that there is no net plutonium production: production in the interior is offset by destruction in the periphery. Using this approach a 50 MT WGPu inventory could be eliminated in approximately 400 reactor years of operation. Assuming all other existing constraints were removed, the 72 operating US PWRs could disposition 50 MT of WGPu in 5.6 years. Use of a low fissile loading plutonium-erbium inert-oxide-matrix composition in the peripheral assemblies essentially destroys 100% of the 239 Pu and ≥90% total Pu over two 18 month fuel cycles. Core radial power peaking, reactivity vs EFPD profiles and core average reactivity coefficients were found to be comparable to standard PWR values. Hence, minimal impact on reload licensing is anticipated. Examination of potential candidate fuel matrices based on the existing experience base and thermo-physical properties resulted in the recommendation of three inert fuel matrix compositions for further study: zirconia, alumina and TRISO particle fuels. Objective metrics for quantifying the inherent proliferation resistance of plutonium host waste and fuel forms are proposed and were applied to compare the proposed spent WGPu non-uranium fuel to spent WGPu MOX fuels and WGPu borosilicate glass logs. The elimination disposition option spent non-uranium fuel product was found to present significantly greater barriers to proliferation than other plutonium disposal products

  17. Destruction of plutonium using non-uranium fuels in pressurized water reactor peripheral assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Chodak, III, Paul [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    1996-05-01

    This thesis examines and confirms the feasibility of using non-uranium fuel in a pressurized water reactor (PWR) radial blanket to eliminate plutonium of both weapons and civilian origin. In the equilibrium cycle, the periphery of the PWR is loaded with alternating fresh and once burned non-uranium fuel assemblies, with the interior of the core comprised of conventional three batch UO2 assemblies. Plutonium throughput is such that there is no net plutonium production: production in the interior is offset by destruction in the periphery. Using this approach a 50 MT WGPu inventory could be eliminated in approximately 400 reactor years of operation. Assuming all other existing constraints were removed, the 72 operating US PWRs could disposition 50 MT of WGPu in 5.6 years. Use of a low fissile loading plutonium-erbium inert-oxide-matrix composition in the peripheral assemblies essentially destroys 100% of the 239Pu and ≥90% {sub total}Pu over two 18 month fuel cycles. Core radial power peaking, reactivity vs EFPD profiles and core average reactivity coefficients were found to be comparable to standard PWR values. Hence, minimal impact on reload licensing is anticipated. Examination of potential candidate fuel matrices based on the existing experience base and thermo-physical properties resulted in the recommendation of three inert fuel matrix compositions for further study: zirconia, alumina and TRISO particle fuels. Objective metrics for quantifying the inherent proliferation resistance of plutonium host waste and fuel forms are proposed and were applied to compare the proposed spent WGPu non-uranium fuel to spent WGPu MOX fuels and WGPu borosilicate glass logs. The elimination disposition option spent non-uranium fuel product was found to present significantly greater barriers to proliferation than other plutonium disposal products.

  18. Multiple lead seal assembly for a liquid-metal-cooled fast-breeder nuclear reactor

    International Nuclear Information System (INIS)

    Hutter, E.; Pardini, J.A.

    1977-01-01

    A reusable multiple lead seal assembly provides leak-free passage of stainless-steel-clad instrument leads through the cover on the primary tank of a liquid-metal-cooled fast-breeder nuclear reactor. The seal isolates radioactive argon cover gas and sodium vapor within the primary tank from the exterior atmosphere and permits reuse of the assembly and the stainless-steel-clad instrument leads. Leads are placed in flutes in a seal body, and a seal shell is then placed around the seal body. Circumferential channels in the body and inner surface of the shell are contiguous and together form a conduit which intersects each of the flutes, placing them in communication with a port through the wall of the seal shell. Liquid silicone rubber sealant is injected into the flutes through the port and conduit; the sealant fills the space in the flutes not occupied by the leads themselves and dries to a rubbery hardness. A nut, threaded onto a portion of the seal body not covered by the seal shell, jacks the body out of the shell and shears the sealant without damage to the body, shell, or leads. The leads may then be removed from the body. The sheared sealant is cleaned from the body, leads, and shell and the assembly may then be reused with the same or different leads. 3 claims, 6 figures

  19. Modular head assembly and method of retrofitting existing nuclear reactor facilities

    International Nuclear Information System (INIS)

    Malandra, L.J.; Ledue, R.J.; Hankinson, M.F.; Kowalski, E.F.

    1987-01-01

    A method is described of retrofitting existing nuclear reactor facilities so as to form a modular closure head assembly for a nuclear reactor pressure vessel, where the existing nuclear reactor facilities comprise control rod drive mechanism cooling systems which include vertically extending elbow air ducts inter-connecting vertically spaced upper and lower air manifolds. The elbow air ducts extend radially beyond the peripheral envelope of the closure head, comprising the steps of: removing the upper air manifold; removing the vertically extending elbow air ducts; capping the air ports of the lower air manifold which ports were previously fluidically connecting the lower air manifold to the vertically extending elbow air ducts; disposing vertically upwardly extending air exhaust ducts above the lower air manifold in such an manner that the air exhaust ducts are disposed within the peripheral envelope of the closure head; fluidically connecting exhaust fans to the upper regions of the air exhaust ducts; fluidically connecting the lower regions of the air exhaust ducts the lower air manifold; permanently securing lift rods to the closure head at positions disposed radially outwardly of the lower air manifold; attaching a seismic support platform to the lift rods; proving fluidic passage of the vertically extending air exhaust ducts through the seismic support platform; attaching a missile shield plate to the lift rods; and proving fluidic passage of the vertically extending air exhaust ducts through the missile shield plate

  20. Experimental Studies on Assemblies 1 and 2 of the Fast Reactor FR-0. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, T L; Hellstrand, E; Londen, S O; Tiren, L I

    1965-08-15

    FR0 is a fast zero power reactor built for experiments in reactor physics. It is a split table machine containing vertical fuel elements. 120 kg of U{sup 235} are available as fuel, which is fabricated into metallic plates of 20 % enrichment. The control system comprises 5 spring-loaded safety elements and 3 + 1 elements for startup operations and power control. The reactor went critical in February 1964. The first assemblies studied were made up of undiluted fuel into a cylindrical and a spherical core, respectively, surrounded by a reflector made of copper. The present report describes some experiments made on these systems. Primarily, critical mass determinations, flux distribution measurements and studies of the conversion ratio are dealt with. The measured quantities have been compared with theoretical predictions using various transport theory programmes (DSN, TDC) and cross section sets. The experimental results show that the neutron spectrum in the copper reflector is softer than predicted, but apart from this discrepancy agreement with theory has generally been obtained.

  1. Experimental Studies on Assemblies 1 and 2 of the Fast Reactor FR-0. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Hellstrand, E; Andersson, T L; Brunfelter, B; Kockum, J; Londen, S O; Tiren, L I

    1965-12-15

    In a first part of this report, published as AE-195, an account was given of critical mass determinations and measurements of flux distribution and reaction ratios in the first assemblies of the fast zero power reactor FR0. This second part of the report deals with various investigations involving the measurement of reactivity. Control rod calibrations have been made using the positive period, the inverse multiplication, the rod drop and the pulsed source techniques, and show satisfactory agreement between the various methods. The reactivity worths of samples of different materials and different sizes have been measured at the core centre. Comparisons with perturbation calculations show that the regular and adjoint fluxes are well predicted in the central region of the core. The variation in the prompt neutron life-time with reactivity has been studied by means of the pulsed source and the Rossi-{alpha} techniques. Comparison with one region calculations reveals large discrepancies, indicating that this simple model is inadequate. Some investigations of streaming effects in an empty channel in the reactor and of interaction effects between channels have been made and are compared with theoretical estimates. Measurements of the reactivity worth of an air gap between the reactor halves and of the temperature coefficient are also described in the report. The work has been performed as a joint effort by AB Atomenergi and the Research Institute of National Defence.

  2. Study of graphite reactivity worth on well-defined cores assembled on LR-0 reactor

    International Nuclear Information System (INIS)

    Košťál, Michal; Rypar, Vojtěch; Milčák, Ján; Juříček, Vlastimil; Losa, Evžen; Forget, Benoit; Harper, Sterling

    2016-01-01

    Highlights: • A light water critical facility for graphite reactivity worth measurements. • Comparison of calculated and measured k eff . • Effect of graphite description on k eff . - Abstract: Graphite is an often-used moderating material on the basis of its good moderating power and very low absorption cross section. This small absorption cross section permits the use of natural or low-enriched uranium in graphite moderated reactors. Graphite is now being considered as the moderator for Fluoride-salt-cooled High Temperature Reactors (FHR). The critical moderator level was measured for various graphite block configurations in an experimental dry assembly of the LR-0 reactor. Comparisons with experiments were performed between Monte Carlo simulation tools for which satisfactory agreement was obtained with the exception of some systematic discrepancies. The larger discrepancies were observed when using the ENDF/B-VII.0 library. To decrease the uncertainties, based on conservative assumptions, relative comparisons were done. The results provided by the different nuclear data libraries are within 3 sigma interval of experimental uncertainties. It has been determined that differences between the results of calculations are caused by variations in the (n,n), (n,n′), (n,g) reactions and also by various angular distributions, while the (n,g) cross section variations play only a minor role for these configurations.

  3. Numerical verification/validation of the theory of coupled reactors for deuterium critical assembly, using MCNP5 and Serpent codes

    International Nuclear Information System (INIS)

    Hussein, M.S; Lewis, B.J.; Bonin, H.W.

    2013-01-01

    The theory of multipoint coupled reactors developed by multi-group transport is verified by using the probabilistic transport code MCNP5 and the continuous-energy Monte Carlo reactor physics burnup calculation Serpent code. The verification was performed by calculating the multiplication factors (or criticality factors) and coupling coefficients for a two-region test reactor known as the Deuterium Critical Assembly, DCA. The multiplication factors k eff calculated numerically and independently from simulations of the DCA by MCNP5 and Serpent codes are compared with the multiplication factors k eff calculated based on the coupled reactor theory. Excellent agreement was obtained between the multiplication factors k eff calculated with the Serpent code, with MCNP5, and from the coupled reactor theory. This analysis demonstrates that the Serpent code is valid for the multipoint coupled reactor calculations. (author)

  4. Numerical verification/validation of the theory of coupled reactors for deuterium critical assembly, using MCNP5 and Serpent codes

    Energy Technology Data Exchange (ETDEWEB)

    Hussein, M.S, E-mail: mohamed.hussein@rmc.ca [Royal Military College of Canada, Dept. of Chemistry and Chemical Engineering, Kingston, Ontario (Canada); Lewis, B.J., E-mail: Brent.Lewis@uoit.ca [Univ. of Ontario Inst. of Technology, Faculty of Energy Systems and Nuclear Science, Oshawa, Ontario (Canada); Bonin, H.W., E-mail: bonin-h@rmc.ca [Royal Military College of Canada, Dept. of Chemistry and Chemical Engineering, Kingston, Ontario (Canada)

    2013-07-01

    The theory of multipoint coupled reactors developed by multi-group transport is verified by using the probabilistic transport code MCNP5 and the continuous-energy Monte Carlo reactor physics burnup calculation Serpent code. The verification was performed by calculating the multiplication factors (or criticality factors) and coupling coefficients for a two-region test reactor known as the Deuterium Critical Assembly, DCA. The multiplication factors k{sub eff} calculated numerically and independently from simulations of the DCA by MCNP5 and Serpent codes are compared with the multiplication factors k{sub eff} calculated based on the coupled reactor theory. Excellent agreement was obtained between the multiplication factors k{sub eff} calculated with the Serpent code, with MCNP5, and from the coupled reactor theory. This analysis demonstrates that the Serpent code is valid for the multipoint coupled reactor calculations. (author)

  5. Numerical Analysis on the Free Fall Motion of the Control Rod Assembly for the Sodium Cooled Fast Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Se-Hong; Choi, Choengryul; Son, Sung-Man [ELSOLTEC, Yongin (Korea, Republic of); Kim, Jae-Yong; Yoon, Kyung-Ho [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    On receiving the scram signal, the control rod assemblies are released to fall into the reactor core by its weight. Thus drop time and falling velocity of the control rod assembly must be estimated for the safety evaluation. However, because of its complex shape, it is difficult to estimate the drop time by theoretical method. In this study, numerical analysis has been carried out in order to estimate drop time and falling velocity of the control rod assembly to provide the underlying data for the design optimization. Numerical analysis has been carried out to estimate the drop time and falling velocity of the control rod assembly for sodium-cooled fast reactor. Before performing the numerical analysis for the control rod assembly, sphere dropping experiment has been carried out for verification of the CFD methodology. The result of the numerical analysis for the method verification is almost same as the result of the experiment. Falling velocity and drag force increase rapidly in the beginning. And then it goes to the stable state. When the piston head of the control rod assembly is inserted into the damper, the drag force increases instantaneously and the falling velocity decreases quickly. The falling velocity is reduced about 14 % by damper. The total drop time of the control rod assembly is about 1.47s. In the next study, the experiment for the control rod assembly will be carried out, and its result is going to be compared with the CFD analysis result.

  6. Development of numerical simulation system for thermal-hydraulic analysis in fuel assembly of sodium-cooled fast reactor

    Energy Technology Data Exchange (ETDEWEB)

    Ohshima, Hiroyuki; Uwaba, Tomoyuki [Japan Atomic Energy Agency (4002 Narita, O-arai, Ibaraki 311-1393, Japan) (Japan); Hashimoto, Akihiko; Imai, Yasutomo [NDD Corporation (1-1-6 Jounan, Mito, Ibaraki 310-0803, Japan) (Japan); Ito, Masahiro [NESI Inc. (4002 Narita, O-arai, Ibaraki 311-1393, Japan) (Japan)

    2015-12-31

    A numerical simulation system, which consists of a deformation analysis program and three kinds of thermal-hydraulics analysis programs, is being developed in Japan Atomic Energy Agency in order to offer methodologies to clarify thermal-hydraulic phenomena in fuel assemblies of sodium-cooled fast reactors under various operating conditions. This paper gives the outline of the system and its applications to fuel assembly analyses as a validation study.

  7. Data base for failure/maintenance at the Tritium Systems Test Assembly

    International Nuclear Information System (INIS)

    Gruetzmacher, K.M.; Wilhelm, R.C.

    1986-01-01

    A data collection system for obtaining availability/reliability data on fusion technology has been installed at the Tritium Systems Test Assembly (TSTA) of Los Alamos National Laboratory. The system is fashioned after the Centralized Reliability Data Organization developed at Oak Ridge National Laboratory. The data collection system is currently being used at TSTA and is working well. The amount of data that has been collected at TSTA to date is not sufficient to indicate meaningful trends in availability analysis

  8. Experimental investigation of critical velocity in a parallel plate research reactor fuel assembly

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Alfredo J.A.; Scuro, Nikolas L.; Andrade, Delvonei A., E-mail: ajcastro@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNE-SP), Sao Paulo, SP (Brazil)

    2017-07-01

    The fuel elements of a MTR (Material Testing Reactor) type nuclear reactor are mostly composed of aluminum coated fuel plates containing the core of uranium silica (U{sub 3}Si{sub 2}) dispersed in an aluminum matrix. These plates have a thickness of the order of millimeters and are much longer in relation to their thickness. They are arranged in parallel in the assembly of the fuel element to form channels between them a few millimeters in thickness, through which there is a flow of the coolant. This configuration, combined with the need for a flow at high flow rates to ensure the cooling of the fuel element in operation, may create problems of mechanical failure of fuel plate due to the vibration induced by the flow in the channels. In the case of critical velocity excessive permanent deflections of the plates can cause blockage of the flow channel in the reactor core and lead to overheating in the plates. For this study an experimental bench capable of high volume flows and a test section that simulates a plate-like fuel element with three cooling channels were developed. The dimensions of the test section were based on the dimensions of the Fuel Element of the Brazilian Multipurpose Reactor (RMB), whose project is being coordinated by the National Commission of Nuclear Energy (CNEN). The experiments performed attained the objective of reaching Miller's critical velocity condition. The critical velocity was reached with 14.5 m/s leading to the consequent plastic deformation of the flow channel plates. (author)

  9. Efficacy of dry-ice blasting in preventive maintenance of auto robotic assemblies

    Science.gov (United States)

    Baluch, Nazim; Mohtar, Shahimi; Abdullah, Che Sobry

    2016-08-01

    Welding robots are extensively applied in the automotive assemblies and `Spot Welding' is the most common welding application found in the auto stamping assembly manufacturing. Every manufacturing process is subject to variations - with resistance welding, these include; part fit up, part thickness variations, misaligned electrodes, variations in coating materials or thickness, sealers, weld force variations, shunting, machine tooling degradation; and slag and spatter damage. All welding gun tips undergo wear; an elemental part of the process. Though adaptive resistance welding control automatically compensates to keep production and quality up to the levels needed as gun tips undergo wear so that the welds remain reliable; the system cannot compensate for deterioration caused by the slag and spatter on the part holding fixtures, sensors, and gun tips. To cleanse welding robots of slag and spatter, dry-ice blasting has proven to be an effective remedy. This paper describes Spot welding process, analyses the slag and spatter formation during robotic welding of stamping assemblies, and concludes that the dry ice blasting process's utility in cleansing of welding robots in auto stamping plant operations is paramount and exigent.

  10. Design Guidelines for the Development of Virtual Reality and Augmented Reality Training Systems for Maintenance and Assembly Tasks

    Directory of Open Access Journals (Sweden)

    Tecchia Franco

    2011-12-01

    Full Text Available The current work describes design guidelines for the development of Virtual Reality (VR and Augmented Reality (AR platforms to train technicians on maintenance and assembly tasks of industrial machineries. The main skill involved in this kind of tasks is the procedural skill. Based on past literature and studies conducted within the SKILLS project, several main design guidelines were formulated. First, observational learning integrated properly within the training protocol increases training efficiency. Second, training protocols combining physical and cognitive fidelity enhances procedural skills acquisition. Third, guidance aids should be provided in a proper and controlled way. And last, enriched information about the task helps trainees to develop a useful mental model of the task. These recommendations were implemented in both VR and AR training platforms.

  11. EXPERIMENTAL STUDY OF LOCAL HYDRODYNAMICS AND MASS EXCHANGE PROCESSES OF COOLANT IN FUEL ASSEMBLIES OF PRESSURIZED WATER REACTORS

    Directory of Open Access Journals (Sweden)

    S. M. Dmitriev

    2016-01-01

    Full Text Available The results of experimental studies of local hydrodynamics and mass exchange of coolant flow behind spacer and mixing grids of different structural versions that were developed for fuel assemblies of domestic and foreign nuclear reactors are presented in the article. In order to carry out the study the models of the following fuel assemblies have been fabricated: FA for VVER and VBER, FA-KVADRAT for PWR-reactor and FA for KLT-40C reactor. All the models have been fabricated with a full geometrical similarity with full-scale fuel assemblies. The study was carried out by simulating the flow of coolant in a core by air on an aerodynamic test rig. In order to measure local hydrodynamic characteristics of coolant flow five-channel Pitot probes were used that enable to measure the velocity vector in a point by its three components. The tracerpropane method was used for studying mass transfer processes. Flow hydrodynamics was studied by measuring cross-section velocities of coolant flow and coolant rates according to the model cells. The investigation of mass exchange processes consisted of a study of concentration distribution for tracer in experimental model, in determination of attenuation lengths of mass transfer processes behind mixing grids, in calculating of inter-cellar mass exchange coefficient. The database on coolant flow in fuel assemblies for different types of reactors had been accumulated that formed the basis of the engineering substantiation of reactor cores designs. The recommendations on choice of optimal versions of mixing grids have been taken into consideration by implementers of the JSC “OKBM Afrikantov” when creating commissioned fuel assemblies. The results of the study are used for verification of CFD-codes and CFD programs of detailed cell-by-cell calculation of reactor cores in order to decrease conservatism for substantiation of thermal-mechanical reliability.

  12. Determination of power density distribution of fuel assemblies for research reactor by directly measuring the strontium-91 activities

    International Nuclear Information System (INIS)

    Yuan, Liq-Ji

    1987-01-01

    This work described the investigations of reactor core power peaking and three dimensional power density distribution of present core configuration of Tsing Hua Open-pool reactor (THOR). An experimental program, based on non-destructive fuel gamma scanning of 91 Sr activities, provides the data of fission density distribution for individual fuel pin of four-rod TRIGA-LEU cluster or for MTR-type fuel assembly. The informations are essentially important for the safety of reactor operation and for fuel management especially for the mixed loading with three different types of fuel at present. The relative power peaking values and the power density distribution for present core are discussed. (author)

  13. Flow field measurements using LDA and numerical computation for rod bundle of reactor fuel assembly

    International Nuclear Information System (INIS)

    Hu Jun; Zou Zunyu

    1995-02-01

    Local mean velocity and turbulence intensity measurements were obtained with DANTEC 55 X two-dimensional Laser Dopper Anemometry (LDA) for rod bundle of reactor fuel assembly test model which was a 4 x 4 rod bundle. The data were obtained from different experimental cross-sections both upstream and downstream of the model support plate. Measurements performed at test Reynolds numbers of 1.8 x 10 4 ∼3.6 x 10 4 . The results described the local and gross effects of the support plate on upstream and downstream flow distributions. A numerical computation was also given, the experimental results are in good agreement with the numerical one and the others in references. Finally, a few suggestions were proposed for how to use the LDA system well. (11 figs.)

  14. Optimization of the fuel assembly for the Canadian SuperCritical Water-cooled Reactor (SCWR)

    Energy Technology Data Exchange (ETDEWEB)

    French, C., E-mail: Corey.French@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada); Bonin, H.; Chan, P.K. [Royal Military College of Ontario, Kingston, Ontario (Canada)

    2013-07-01

    An approach to develop a parametric optimization tool to support the Canadian Supercritical Water-cooled Reactor (SCWR) fuel design is presented in this work. The 2D benchmark lattices for 78-pin and 64-pin fuel assemblies are used as the initial models from which fuel performance and subsequent optimization stem from. A tandem optimization procedure is integrated which employs the steepest descent method. The physics codes WIMS-AECL, MCNP6 and SERPENT are used to calculate and verify select performance factors. The results are used as inputs to an optimization algorithm that yield optimal fresh fuel isotopic composition and lattice geometry. Preliminary results on verifications of infinite lattice reactivity are demonstrated in this paper. (author)

  15. Innovative technologies on fuel assemblies cleaning for sodium fast reactors: First considerations on cleaning process

    International Nuclear Information System (INIS)

    Simon, N.; Lorcet, H.; Beauchamp, F.; Guigues, E.; Lovera, P.; Fleche, J. L.; Lacroix, M.; Carra, O.; Dechelette, F.; Prele, G.; Rodriguez, G.

    2012-01-01

    Within the framework of Sodium Fast Reactor development, innovative fuel assembly cleaning operations are investigated to meet the GEN IV goals of safety and of process development. One of the challenges is to mitigate the Sodium Water Reaction currently used in these processes. The potential applications of aqueous solutions of mineral salts (including the possibility of using redox chemical reactions) to mitigate the Sodium Water Reaction are considered in a first part and a new experimental bench, dedicated to this study, is described. Anhydrous alternative options based on Na/CO 2 interaction are also presented. Then, in a second part, a functional study conducted on the cleaning pit is proposed. Based on experimental feedback, some calculations are carried out to estimate the sodium inventory on the fuel elements, and physical methods like hot inert gas sweeping to reduce this inventory are also presented. Finally, the implementation of these innovative solutions in cleaning pits is studied in regard to the expected performances. (authors)

  16. NABUB a non-saturated model of coolant boiling in a fast reactor sub-assembly

    International Nuclear Information System (INIS)

    Brook, A.J.; Mills, D.S.

    1975-08-01

    A theoretical model is described of sodium boiling in a fast reactor sub-assembly in which the usual assumptions of a saturated vapour are not made. Instead, vapour pressure is calculated in a perfect gas basis, which enables some allowance to be made for the possible presence of non-condensables, which may inhibit the condensation f the vapour. Indications are given of the circumstances under which such inhibition might be expected to show the most marked effects, and some sample results ontained by the code are presented. These show that the coolant voiding pattern is most sensitive to restrictions on the condensing flux in the 100 to 200w/cm 2 range. If unrestricted condensation is assumed, the results of the code are in excellent agreement with more conventional saturation models. (author)

  17. Variable mounting assembly for transducers employed in nuclear reactor vessel inspection apparatus

    International Nuclear Information System (INIS)

    Elsner, H.J.; Antol, R.F.; Castner, R.P.

    1979-01-01

    A positionally variable mounting assembly for transducers used to interrogate a nuclear reactor vessel is disclosed. Means are provided for clamping each transducer of an array about its flange in a central restraining block. The central restraining block is, in turn, pivotally mounted in a yoke. The yoke is movable secured to bars or rails bolted to the transducer plate and, by loosening appropriate bolts, can be moved along the ways or pivoted about one of them. Further, the restraining block can be removed from the yoke and pivotally clamped in a different orientation to upstanding brackets attached to the transducer array plate, or rotated through 90 0 and then secured again in the yoke

  18. The measurement of neutron and neutron induced photon spectra in fusion reactor related assemblies

    CERN Document Server

    Unholzer, S; Klein, H; Seidel, K

    2002-01-01

    The spectral neutron and photon fluence (or flux) measured outside and inside of assemblies related to fusion reactor constructions are basic quantities of fusion neutronics. The comparison of measured spectra with the results of MCNP neutron and photon transport calculations allows a crucial test of evaluated nuclear data as generally used in fusion applications to be carried out. The experiments concern mixed neutron/photon fields with about the same intensity of the two components. An NE-213 scintillation spectrometer, well described by response matrices for both neutrons and photons, is used as proton-recoil and Compton spectrometer. The experiments described here in more detail address the background problematic of two applications, an iron benchmark experiment with an ns-pulsed neutron source and a deep penetration mock-up experiment for the investigation of the ITER in-board shield system. The measured spectral neutron and photon fluences are compared with spectra calculated with the MCNP code on the b...

  19. Eddy current monitoring of spacers in coolant channel assemblies of nuclear reactor

    International Nuclear Information System (INIS)

    Bhole, V.M.; Rastogi, P.K.; Kulkarni, P.G.; Vijayaraghavan, R.

    1993-01-01

    An eddy current testing method has been standardised for monitoring spacer springs which are used in coolant channel assemblies of pressurised heavy water nuclear reactors (PHWRs). The standard bobbin coil probe used for monitoring the spacer spring detects only the location but does not monitor the tilt orientation and tilt angle of a tilted spacer spring. The knowledge of location along with the tilt orientation of the spacer spring greatly improves the performance of repositioning methods. A modified probe with angular windings has been developed in laboratory tests for monitoring the location as well as the tilt orientation of the spacer springs. Experimental results are presented showing excellent performance of the modified probe in monitoring the exact location as well as tilt orientation of a spacer spring. The modified probe has also been used successfully in the field during repositioning of spacer springs in PHWRs before commissioning. (Author)

  20. Evaluation of neutron streaming in fast breeder reactor fuel assembly by double heterogeneous modelling

    International Nuclear Information System (INIS)

    Unesaki, Hironobu; Takeda, Toshikazu

    1988-01-01

    Neutron streaming in a fast breeder reactor fuel assembly caused by the double heterogeneity structure is estimated by double heterogeneous modelling. The conventional pin cell model, a two-region subassembly model and the exact pin cluster model are used to take into account the streaming effect caused by the pin cell structure and the surrounding wrapper tube structure. The heterogeneity of wrapper tube and its surrounding sodium is explicitly considered. The streaming effect is evaluated based on Benoist's diffusion coefficient. The total streaming effect caused by the double heterogeneity structure of a fuel subassembly is found to be -0.2 % dk/kk' for k eff , which is almost twice that obtained from the conventional pin cell model of -0.1 % dk/kk'. (author)

  1. Refitting of the 'Celimene' hot cell for following up the fuel assembly of 900 MWe PWR power reactors

    International Nuclear Information System (INIS)

    Lhermenier, Andre; Van Craeynest, J.-C.

    1980-05-01

    The 'Celimene' cell adjoining the EL3 reactor provides for the acceptance, handling and the examination of irradiated fuel assemblies from power reactors (length approximately 4m, weight approximately 700 kg). Within the framework of the PWR fuel behavior follow-up or reprocessing, it is possible to extract an assembly representative of the normal fuel cycle, carry out non destructive tests on this assembly, extract pencils from it and re-insert this assembly, after refitting the head, into the normal fuel cycle for handling in a reprocessing plant or storage pond. Given suitable refitting techniques, the re-irradiation of the assembly can be considered after examination. Significant changes have been made to the buildings and the hoist facilities for handling very heavy flasks. It was necessary to rearrange the handling, machining and in-cell storage facilities. The development of an inspection rig will make it possible, some time in 1980, to carry out non destructive tests of assemblies, optical and metrological examination of assemblies prior to dismantling or of the structure after dismantling [fr

  2. Advanced cutting, welding and inspection methods for vacuum vessel assembly and maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Jones, L. E-mail: jonesl@ipp.mgg.de; Alfile, J.-P.; Aubert, Ph.; Punshon, C.; Daenner, W.; Kujanpaeae, V.; Maisonnier, D.; Serre, M.; Schreck, G.; Wykes, M

    2000-11-01

    ITER requires a 316 l stainless steel, double-skinned vacuum vessel (VV), each shell being 60 mm thick. EFDA (European Fusion Development Agreement) is investigating methods to be used for performing welding and NDT during VV assembly and also cutting and re-welding for remote sector replacement, including the development of an Intersector Welding Robot (IWR) [Jones et al. This conference]. To reduce the welding time, distortions and residual stresses of conventional welding, previous work concentrated on CO{sub 2} laser welding and cutting processes [Jones et al. Proc. Symp. Fusion Technol., Marseilles, 1998]. NdYAG laser now provides the focus for welding of the rearside root and for completing the weld for overhead positions with multipass filling. Electron beam (E-beam) welding with local vacuum offers a single-pass for most of the weld depth except for overhead positions. Plasma cutting has shown the capability to contain the backside dross and preliminary work with NdYAG laser cutting has shown good results. Automated ultrasonic inspection of assembly welds will be improved by the use of a phased array probe system that can focus the beam for accurate flaw location and sizing. This paper describes the recent results of process investigations in this R and D programme, involving five European sites and forming part of the overall VV/blanket research effort [W. Daenner et al. This conference].

  3. Role of Ocrl1 and Inpp5E in primary cilia assembly and maintenance: a phosphatidylinositol phosphatase relay system?

    Directory of Open Access Journals (Sweden)

    Madhivanan K

    2016-02-01

    Full Text Available Kayalvizhi Madhivanan,* Swetha Ramadesikan,* R Claudio Aguilar Department of Biological Sciences, Purdue University, West Lafayette, IN, USA *These authors contributed equally to this work Abstract: The primary cilium (PC is a plasma membrane-derived structure of great importance for cell and organismal physiology. Indeed, abnormalities in assembly or function of the PC trigger the onset of a group of genetic diseases collectively known as ciliopathies. In recent years, it has become evident that the integrity and function of the PC depends substantially on signaling elements such as phosphoinositides (PI and their regulators. Because phospholipids such as PI(4,5P2 constitute recruitment platforms for cytoskeleton, signaling, and trafficking machinery, control over their levels is critical for PC function. Although information about phosphoinositol phosphate (PIP kinases in the PC is scarce, a growing body of evidence supports a role for PIP phosphatases in cilia assembly/maintenance. Indeed, deficiencies in two 5′ PIP phosphatases, Inpp5E and Ocrl1, are clearly linked to ciliopathies like Joubert/MORM syndromes, or ciliopathy-associated diseases like Lowe syndrome. Here, we review the unique roles of these proteins and their specific site of action for ensuring ciliary integrity. Further, we discuss the possibility that a phosphatase relay system able to pass PI control from a preciliary to an intraciliary compartment is in place to ensure PC integrity/function. Keywords: primary cilia, Ocrl1, Inpp5E, Pip2, Pip3

  4. In-core assembly configuration having a dual-wall pressure boundary for nuclear reactor

    International Nuclear Information System (INIS)

    Todt, W.H. Sr.; Playfoot, K.C.

    1988-01-01

    This patent describes an in-core detector assembly of the type having an in-core part and an out-of-core part and having an elongated outer hollow housing tube with a wall thickness, an inner hollow calibration tube with a wall thickness and disposed concentrically within the outer tube to define an annular space therewith, and a plurality of discrete, circular, rod-like elements extending through the annular space, the improvement comprising: the elements having outer diameters and being of a number to substantially occupy the entire annular space of both the incore and out-of-core parts without significant voids between elements; each of the elements including at least an outer sheath and interior highly compacted mineral insulation for the entire length of the element; a first number of the elements also including center lead means connected to condition responsive element means in the in-core part of the length of the assembly and a second, remaining number of the elements being non-operating elements. The wall thickness of the housing tube and the wall thickness of the calibration tube, taken together with the diameter of the elements, provide a thickness dimension adequate to meet code primary pressure requirements for normal nuclear reactor in-core conditions, while the wall thickness of the calibration tube alone provides a thickness dimension less than adequate to meet such requirements

  5. Artificial neural networks for spatial distribution of fuel assemblies in reload of PWR reactors

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Edyene; Castro, Victor F.; Velásquez, Carlos E.; Pereira, Claubia, E-mail: claubia@nuclear.ufmg.br [Universidade Federal de Minas Gerais (UFMG), Belo Horizonte, MG (Brazil). Programa de Pós-Graduação em Ciências e Técnicas Nucleares

    2017-07-01

    An artificial neural network methodology is being developed in order to find an optimum spatial distribution of the fuel assemblies in a nuclear reactor core during reload. The main bounding parameter of the modelling was the neutron multiplication factor, k{sub ef{sub f}}. The characteristics of the network are defined by the nuclear parameters: cycle, burnup, enrichment, fuel type, and average power peak of each element. These parameters were obtained by the ORNL nuclear code package SCALE6.0. As for the artificial neural network, the ANN Feedforward Multi{sub L}ayer{sub P}erceptron with various layers and neurons were constructed. Three algorithms were used and tested: LM (Levenberg-Marquardt), SCG (Scaled Conjugate Gradient) and BayR (Bayesian Regularization). Artificial neural network have implemented using MATLAB 2015a version. As preliminary results, the spatial distribution of the fuel assemblies in the core using a neural network was slightly better than the standard core. (author)

  6. COUPLED SIMULATION OF GAS COOLED FAST REACTOR FUEL ASSEMBLY WITH NESTLE CODE SYSTEM

    Directory of Open Access Journals (Sweden)

    Filip Osusky

    2018-05-01

    Full Text Available The paper is focused on coupled calculation of the Gas Cooled Fast Reactor. The proper modelling of coupled neutronics and thermal-hydraulics is the corner stone for future safety assessment of the control and emergency systems. Nowadays, the system and channel thermal-hydraulic codes are accepted by the national regulatory authorities in European Union for license purposes, therefore the code NESTLE was used for the simulation. The NESTLE code is a coupled multigroup neutron diffusion code with thermal-hydraulic sub-channel code. In the paper, the validation of NESTLE code 5.2.1 installation is presented. The processing of fuel assembly homogeneous parametric cross-section library for NESTLE code simulation is made by the sequence TRITON of SCALE code package system. The simulated case in the NESTLE code is one fuel assembly of GFR2400 concept with reflective boundary condition in radial direction and zero flux boundary condition in axial direction. The results of coupled calculation are presented and are consistent with the GFR2400 study of the GoFastR project.

  7. Some Windscale experience of the underwater examination of water reactor fuel assemblies

    International Nuclear Information System (INIS)

    Banks, D.A.; Prestwood, J.; Stuttard, A.

    1981-01-01

    Windscale Nuclear Laboratories have been involved in the underwater post irradiation examination of irradiated water reactor fuel since the early 1970's. Since the work of the laboratories covers a wide range of fuel types, the equipment has had to be capable of handling any design, long or short, circular or square. There has so far been no element of routine work in the tasks performed at Windscale, for in this period fuel assemblies from 9 LWR's and WSGHWR have been examined successfully. Individual jobs have ranged from visual examination which may be carried out at several magnifications, to the complete breakdown of a PWR assembly to its separate rods and grids. Between these limits rod bow and rod diameter have been measured, rod withdrawal forces determined, and eddy current test methods devised. Cutting equipment has been used for a variety of dismantling tasks, and underwater cameras have been employed for monochrome and colour photography, using standard and macro lenses. The equipment is described. (author)

  8. Reactor physics studies in the steam flooded GCFR-Phase II critical assembly

    International Nuclear Information System (INIS)

    Bhattacharyya, S.K.

    1978-08-01

    A possible accident scenario in a Gas-Cooled Fast Reactor (GCFR) is the leakage of secondary steam into the core. Considerable analytical effort has gone into the study of the effects of such an accidental steam entry. The work described represents the first full scale experimental study of the steam-entry phenomenon in GCFRs. The reference GCFR model used for the study was the benchmark GCFR Phase II assembly, and polyethylene foam was used to provide a very homogeneous steam simulation. The reactivity worth of steam entry was measured for three different steam densities. In addition, a set of integral physics parameters were measured in the largest steam density (0.008 g/cm 3 ) configuration. The corresponding parameters were also measured in dry reference GCFR critical assembly for comparison. The experiments were analyzed using ENDF/B-IV data and two-dimensional diffusion theory methods. As in earlier GCFR critical experiments analysis, the Benoist method was used to treat the problem of neutron streaming

  9. Accelerating the design and testing of LEU fuel assemblies for conversion of Russian-designed research reactors outside Russia

    International Nuclear Information System (INIS)

    Matos, J.E

    2003-01-01

    This paper identifies proposed geometries and loading specifications of LEU tube-type and pin-type test assemblies that would be suitable for accelerating the conversion of Russian-designed research reactors outside of Russia if these fuels are manufactured, qualified by irradiation testing, and made commercially available in Russia. (author)

  10. Numerical simulation of fuel assembly thermohydraulics of fast reactors with the partial blockage of cross section under the coolant

    International Nuclear Information System (INIS)

    Zhukov, A.V.; Sorokin, A.P.

    2000-01-01

    The problems of numerical modeling of thermohydraulics in assembly of fuel elements of fast reactors with the partial blockage of cross-section under the coolant are considered. The information about existing codes constructed on use of subchannel technique and model of porous body are presented. The results of calculation obtained by these codes are presented. (author)

  11. Modified fuel assembly design for pressurized water reactors with improved fuel utilization

    International Nuclear Information System (INIS)

    Galperin, A.; Ronen, Y.

    1983-01-01

    A method for reactivity control through variation of the moderator content in the reactor core was proposed. The main idea is to adjust the amount of water in the core from a low value at beginning of cycle to a high value at end of cycle, so as to compensate for fissile material burnup and buildup of fission products. The possible implementation of this idea may be carried out by introducing a number of hollow tubes into the fuel assembly between the fuel rods. Then variation of the moderator content in the core may be managed through a change of the water level in these tubes. cated a potential savings in the fuel cycle requirements and costs. Preliminary steady-state thermal-hydraulic calculations indicate the possibility of implementing the proposed method in the existing pressurized water reactor plants. Feasibility of the proposed design may be finally established after rigorous thermal hydraulics as well as safety analysis calculations. Furthermore, there is need to elaborate the mechanical design of the pressure vessel internals together with cost benefit analysis

  12. Operation, maintenance and utilization of the RA reactor, Annual report 1978

    International Nuclear Information System (INIS)

    Milosevic, M.

    1978-12-01

    It has been planned for 1978 that the RA reactor would be operated for 158 dana at nominal power of 6.5 MW meaning production of 24 648 MWh. The plan was fulfilled since 24 652 MWh was produces. Reactor operation for 158 days is relevant to reactor operation for 200 days in the period before 1975. The reason is increased neutron flux achieved due to improved fuel management and the characteristics of the new 80% enriched fuel. At the end of 1978 the reactor core contained 45% of 80% enriched fuel elements. Increase of neutron flux has shortened the typical time needed for irradiation of the most important samples for isotope production. This significant success in reactor operation is at the same time an obligation for increasing its utilization. Some new trends proposed for increasing reactor utilization capacities were presented at the Conference on utilization of research nuclear reactors in Yugoslavia held in May 1978 [sr

  13. Application of reliability-centered maintenance to boiling water reactor emergency core cooling systems fault-tree analysis

    International Nuclear Information System (INIS)

    Choi, Y.A.; Feltus, M.A.

    1995-01-01

    Reliability-centered maintenance (RCM) methods are applied to boiling water reactor plant-specific emergency core cooling system probabilistic risk assessment (PRA) fault trees. The RCM is a technique that is system function-based, for improving a preventive maintenance (PM) program, which is applied on a component basis. Many PM programs are based on time-directed maintenance tasks, while RCM methods focus on component condition-directed maintenance tasks. Stroke time test data for motor-operated valves (MOVs) are used to address three aspects concerning RCM: (a) to determine if MOV stroke time testing was useful as a condition-directed PM task; (b) to determine and compare the plant-specific MOV failure data from a broad RCM philosophy time period compared with a PM period and, also, compared with generic industry MOV failure data; and (c) to determine the effects and impact of the plant-specific MOV failure data on core damage frequency (CDF) and system unavailabilities for these emergency systems. The MOV stroke time test data from four emergency core cooling systems [i.e., high-pressure coolant injection (HPCI), reactor core isolation cooling (RCIC), low-pressure core spray (LPCS), and residual heat removal/low-pressure coolant injection (RHR/LPCI)] were gathered from Philadelphia Electric Company's Peach Bottom Atomic Power Station Units 2 and 3 between 1980 and 1992. The analyses showed that MOV stroke time testing was not a predictor for eminent failure and should be considered as a go/no-go test. The failure data from the broad RCM philosophy showed an improvement compared with the PM-period failure rates in the emergency core cooling system MOVs. Also, the plant-specific MOV failure rates for both maintenance philosophies were shown to be lower than the generic industry estimates

  14. Taipower plans to cut O and M costs [reactor maintenance management

    International Nuclear Information System (INIS)

    Tsui, S.J.

    1989-01-01

    Taipower aims to reduce operation and maintenance costs at its three BWRs, as well as the time devoted by plant personnel to O and M paper work, by ensuring that maintenance and spare-parts management is systematic and well documented. It is currently developing an on-line maintenance information system, known as the Maintenance Management Computerization System (MMCS), which can be accessed from any of Taipower's plants. MMCS is designed to be an on-line interactive multiple-user system through which the authorized user has immediate access to maintenance information. It will be used for preventive and corrective maintenance, surveillance tests, tagging, document control, instrument calibration and refuelling outage management. The system is simple to operate, using pull-down menus and standard text. (author)

  15. Operation and maintenance of RA Reactor, Annual report 1977; Pogon i odrzavanje reaktora RA - Izvestaj o radu u 1977. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    During 1977, the RA Reactor was operated at nominal power of 6.5 MW for 183 days. Total production was 28582 MWh which is 10% higher than planned. Second phase of introducing the 80% enriched fuel was fulfilled according to the plan. This means that the reactor core will be filled with highly enriched fuel in 1978. Refueling was done three time during the past year. After completing the first phase of the fuel exchange which was related mostly to reactor safety, the second phase will be devoted to the more efficient increase of neutron flux . This second phase is of utmost importance because higher neutron flux will provide better and more efficient reactor application from economic point of view. This will justify the application of the new more expensive highly enriched fuel. The budget for reactor operation and maintenance is hardly enough to cover the maintenance of the components and instrumentation. During 1977 there were no accidents related nor incidents related to the instrumentation or related to radiation protection. [Serbo-Croat] Reaktor RA je u toku 1977. godine ostvario rad od 28583 MWh odnosno 183 dana rada na nominalnoj snazi, sto u odnosu na plan rada iznosi 10% vise od planiranog. Druga faza uvodjenja 80% obogacenog goriva izvrsena je prema planu sto znaci da ce se punjenje jezgra reaktora 80% gorivom zavrsiti u toku 1978. godine. Izvrsene su tri izmene goriva. Posle isteka prvog dela prelaznog rezima koji je usmeren na maksimalnu sigurnost reaktora preci ce se na drugi deo usmeren na vece i brze povecanje neutronskog fluksa. Druga faza je od izuzetnog znacaja jer ce omoguciti bolje i znatno ekonomicnije koriscenje reaktora i opravdati upotrebu novog i skupljeg goriva. Sredstva za pogon i odrzavanje reaktora RA su jedva dovoljna za odrzavanje neophodnog nivoa opreme. Akcidenata u toku 1977. godine nije bilo ni sa opremom ni u pogledu zastite od zracenja.

  16. Prototype tokamak fusion reactor based on SiC/SiC composite material focusing on easy maintenance

    International Nuclear Information System (INIS)

    Nishio, S.; Ueda, S.; Kurihara, R.; Kuroda, T.; Miura, H.; Sako, K.; Takase, H.; Seki, Y.; Adachi, J.; Yamazaki, S.; Hashimoto, T.; Mori, S.; Shinya, K.; Murakami, Y.; Senda, I.; Okano, K.; Asaoka, Y.; Yoshida, T.

    2000-01-01

    If the major part of the electric power demand is to be supplied by tokamak fusion power plants, the tokamak reactor must have an ultimate goal, i.e. must be excellent in construction cost, safety aspect and operational availability (maintainability and reliability), simultaneously. On way to the ultimate goal, the approach focusing on the safety and the availability (including reliability and maintainability) issues must be the more promising strategy. The tokamak reactor concept with the very high aspect ratio configuration and the structural material of SiC/SiC composite is compatible with this approach, which is called the DRastically Easy Maintenance (DREAM) approach. This is because SiC/SiC composite is a low activation material and an insulation material, and the high aspect ratio configuration leads to a good accessibility for the maintenance machines. As the intermediate steps along this strategy between the experimental reactor such as international thermonuclear experimental reactor (ITER) and the ultimate goal, a prototype reactor and an initial phase commercial reactor have been investigated. Especially for the prototype reactor, the material and technological immaturities are considered. The major features of the prototype and commercial type reactors are as follows. The fusion powers of the prototype and the commercial type are 1.5 and 5.5 GW, respectively. The major/minor radii for the prototype and the commercial type are of 12/1.5 m and 16/2 m, respectively. The plasma currents for the prototype and the commercial type are 6 and 9.2 MA, respectively. The coolant is helium gas, and the inlet/outlet temperatures of 500/800 and 600/900 deg. C for the prototype and the commercial type, respectively. The thermal efficiencies of 42 and 50% are obtainable in the prototype and the commercial type, respectively. The maximum toroidal field strengths of 18 and 20 tesla are assumed in the prototype and the commercial type, respectively. The thermal

  17. A conceptual design of assembly strategy and dedicated tools for assembly of 40o sector

    International Nuclear Information System (INIS)

    Park, H.K.; Nam, K.O.; Kim, D.J.; Ahn, H.J.; Lee, J.H.; Im, K.; Shaw, R.

    2010-01-01

    The International Thermanuclear Experimental Reactor (ITER) tokamak device is composed of 9 vacuum vessel (VV)/toroidal field coils (TFCs)/vacuum vessel thermal shields (VVTS) 40 o sectors. Each VV/TFCs/VVTS 40 o sector is made up of one 40 o VV, two 20 o TFCs and associated VVTS segments. The 40 o sectors are sub-assembled at assembly hall respectively and then nine 40 o sectors sub-assembled at assembly hall are finally assembled at tokamak in-pit hall. The assembly strategy and tools for the 40 o sector sub-assembly and final assembly should be developed to satisfy the basic assembly requirements of the ITER tokamak device. Accordingly, the purpose-built assembly tools should be designed and manufactured considering assembly plan, available space, cost, safety, easy operation, efficient maintenance, and so on. The 40 o sector assembly tools are classified into 2 groups. One group is the sub-assembly tools including upending tool, lifting tool, sub-assembly tool, VV supports and bracing tools used at assembly hall and the other group is the in-pit assembly tools including lifting tool, central column, radial beams and their supports. This paper describes the current status of the assembly strategy and major tools for the VV/TFCs/VVTS 40 o sector assembly at in-pit hall and assembly hall. The conceptual design of the major assembly tools and assembly process at assembly hall and tokamak in-pit hall are presented also.

  18. Design of the Intersector Welding Robot for vacuum vessel assembly and maintenance

    International Nuclear Information System (INIS)

    Jones, L.; Dagenais, J.-F.; Daenner, W.; Maisonnier, D.

    2000-01-01

    Next Step Fusion Devices require on-site (field weld) joining of sectors of the thick-walled vacuum vessel for structural and vacuum integrity. EFDA (European Fusion Development Agreement) is supporting an R and D programme to investigate processes for assembly of the vacuum vessel and to carry out cutting, re-welding and inspection for remote sector replacement, forming part of the overall VV/blanket research effort. In order to direct the process end-effectors along the field joint zone, a track-mounted Intersector Welding Robot (IWR) on a mock-up of a region of the vacuum vessel has been designed and is described in this paper. A rail-mounted hexapod type robot offers six axes of motion over a limited work envelope with high payload to robot weight ratio. A solution to the production of reduced pressure local vacuum is the installation of short, lightweight segments bolted to each other and the vessel wall. The various process heads can be mounted using end-effectors of special design. To minimise the supply and interface problems for the IWR prototype, its motion control and electronic systems will be embedded locally. A laser scan with camera forms the on-line seam tracking capability to compensate for rail and seam deviations

  19. Structural behaviour of fuel assemblies for water cooled reactors. Proceedings of a technical meeting

    International Nuclear Information System (INIS)

    2005-07-01

    At the invitation of the Government of France and in response to a proposal of the IAEA Technical Working Group on Water Reactor Fuel Performance and Technology (TWGFPT), the IAEA convened a Technical Meeting on Fuel Assembly Structural Behaviour in Cadarache, France, from 22 to 26 November 2004. The meeting was hosted by the CEA Cadarache Centre, AREVA Framatome-ANP and Electricite de France. The meeting aimed to provide in depth technical exchanges on PWR and WWER operational experience in the field of fuel assembly mechanical behaviour and the potential impact of future high burnup fuel management on fuel reliability. It addressed in-service experience and remedial solutions, loop testing experience, qualification and damage assessment methods (analytic or experimental ones), mechanical behaviour of the fuel assembly including dynamic and fluid structure interaction aspects, modelling and numerical analysis methods, and impact of the in-service evolution of the structural materials. Sixty-seven participants from 17 countries presented 30 papers in the course of four sessions. The topics covered included the impact of hydraulic loadings on fuel assembly (FA)performance, FA bow and control rod (CR) drop kinetics, vibrations and rod-to-grid wear and fretting, and, finally, evaluation and modelling of accident conditions, mainly from seismic causes. FA bow, CR drop kinetics and hydraulics are of great importance under conditions of higher fuel duties including burnup increase, thermal uprates and longer fuel cycles. Vibrations and rod-to-grid wear and fretting have been identified as a key cause of fuel failure at PWRs during the past several years. The meeting demonstrated that full-scale hydraulic tests and modelling provide sufficient information to develop remedies to increase FA skeleton resistance to hydraulic loads, including seismic ones, vibrations and wear. These proceedings are presented as a book with an attached CD-ROM. The first part of the CD

  20. Research reactor utilization. Summary reports of three study group meetings: Irradiation techniques at research reactors, held in Istanbul 15-19 November 1965; Research reactor operation and maintenance problems, held in Caracas 6-10 December 1965; and Research reactor utilization in the Far East, held in Lucas Heights 28 February - 4 March 1966

    International Nuclear Information System (INIS)

    1967-01-01

    The three sections of this book, which are summary reports of three Study Group meetings of the IAEA: Irradiation techniques at research reactors, Istanbul, 15-19 November 1965; Research reactor operation and maintenance problems, Caracas, 6-10 December 1965; and Research reactor utilization in the Far East, Lucas Heights, Australia, 28 February - 4 March 1966. These meetings were the latest in a series designed to promote efficient utilization of research reactors, to disseminate information on advances in techniques, to discuss common problems in reactor operations, and to outline some advanced areas of reactor-based research. (author)

  1. Maintenance and waste treatment of tritium existing in and out of the fusion reactor systems. 6. Study of tritium confinement in the facility of a fusion reactor

    International Nuclear Information System (INIS)

    Kobayashi, Kazuhiro

    2000-01-01

    In a future fusion reactor, tritium confinement is one of the key issues for safety. Large amount of tritium (a few grams to a hundred grams level) has been handled safely at the several facilities in the world for fusion research under the multiple confinement concept. In this chapter, the study of tritium behavior in large space such as the building is described using the Caisson Assembly for Tritium Safety (CATS) study such as the final confinement and the present R and D status concerning the tritium confinement is reviewed. (author)

  2. Radiation tolerance qualification for maintenance tasks in the future fusion reactors: from fibre-optic components to robust data links

    International Nuclear Information System (INIS)

    Uffelen, M. van; Fernandez, A. Fernandez; Brichard, B.; Berghmans, F.; Decreton, M.

    2003-01-01

    The future International Thermonuclear Experimental Reactor (ITER) requires remote handling tools for its maintenance that will operate in a harsh environment. The numerous instrumentation cables for this maintenance equipment call for (de)multiplexing solutions, in order to reduce the umbilical size. Fibre-optic data links, using commercial-off-the-shelf (COTS) components, are seriously considered as a radiation tolerant solution, offering wavelength encoded multiplexing possibilities. However, an adapted modus operandi for a reliable assessment of this evolving technology is needed, to enable their long-term implementation in a radiation environment. In this paper, we present a methodology towards qualification methods for these instrumentation data links, and illustrate it with results obtained for different individual components. These results should enable the future design of robust architectures for communication links

  3. RA Reactor operation and maintenance (I-IX), part VI, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VI Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor the gas reactor system including the ventilation system was inspected and tested, the components were cleaned. This report describes detailed instructions and actions concerning repair and decontamination of the gas and ventilation systems components.

  4. Experimental investigations of heat transfer during sodium boiling in fuel assembly model in justification of advanced fast reactor safety

    International Nuclear Information System (INIS)

    Khafizov, R.R.; Poplavskij, V.M.; Rachkov, V.I.; Sorokin, A.P.; Ashurko, Yu.M.; Volkov, A.V.; Ivanov, E.F.; Privezentsev, V.V.

    2015-01-01

    The experimental facility is built up and investigation of heat exchange during sodium boiling in simulated fast reactor core assembly in conditions of natural and forced circulation with sodium plenum and upper end shield model are conducted. It is shown that in the presence of sodium plenum there is possibility to provide long-term cooling of fuel assembly when heat flux density on the surface of fuel element simulator up to 140 and 170 kW/m 2 in conditions of natural and forced circulation, respectively. The obtained data is used for improving calculational model of sodium boiling process in fuel assembly and calculational code COREMELT verification. It is pointed out that heat transfer coefficients in the case of liquid metal boiling in fuel assemblies are slightly over the ones in the case of liquid metals boiling in pipes and pool boiling [ru

  5. Improvement of Algorithms for Pressure Maintenance Systems in Drum-Separators of RBMK-1000 Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Aleksakov, A. N., E-mail: yankovskiy.k@nikiet.ru; Yankovskiy, K. I. [JSC “N. A. Dollezhal Research and Development Institute of Power Engineering (NIKIET),” (Russian Federation); Dunaev, V. I.; Kushbasov, A. N. [JSC “Diakont,” (Russian Federation)

    2015-05-15

    The main tasks and challenges for pressure regulation in the drum-separators of RBMK-1000 reactors are described. New approaches to constructing algorithms for pressure control in drum-separators by electro-hydraulic turbine control systems are discussed. Results are provided from tests of the operation of modernized pressure regulators during fast transients with reductions in reactor power.

  6. Cassette blanket and vacuum building: key elements in fusion reactor maintenance

    International Nuclear Information System (INIS)

    Werner, R.W.

    1977-01-01

    The integration of two concepts important to fusion power reactors is discussed. The first concept is the vacuum building which improves upon the current fusion reactor designs. The second concept, the use of the cassette blanket within the vacuum building environment, introduces four major improvements in blanket design: cassette blanket module, zoning concept, rectangular blanket concept, and internal tritium recovery

  7. Recommendations to designers aimed at minimizing radiation dose incurred in operation, maintenance, inspection and repair of light-water reactors

    International Nuclear Information System (INIS)

    1978-01-01

    In the framework of the exchange of experience between nuclear power plant operators organized by the services of the Commission of the European Communities an ad-hoc working party elaborated recommendations particularly directed to those concerned with design of light water reactor plants. The necessary design measures which should be followed to minimize radiation dose incurred in operation, maintenance, inspection and repair of such reactors are listed. The recommendations are based on recent views expressed by operating utilities within the Community. It is intended to revise these recommendations at suitable intervals in order to make use of the most recent experience and to keep the report up to date with the actual state of art in nuclear technology

  8. Mechanical Analysis of an Innovative Assembly Box with Honeycomb Structures Designed for a High Performance Light Water Reactor

    International Nuclear Information System (INIS)

    Herbell, Heiko; Himmel, Steffen; Schulenberg, Thomas

    2008-01-01

    The High Performance Light Water Reactor (HPLWR) is a water cooled reactor concept of the 4. generation, operated at a pressure beyond the critical point of water. Assemblies of this innovative reactor concept need to be built with assembly and moderator boxes, like boiling water reactors, to provide enough moderator water between them to compensate the low coolant density in the core. Hot, superheated steam conditions, on the other hand, require thermally insulated box walls rather than solid box walls to reduce the heat up of the moderator water. As a new an innovative approach, this paper describes moderator- and assembly boxes built from stainless steel honeycomb sandwich structures, in which the honeycomb cells are filled with alumina for thermal insulation. In comparison to solid box walls, the use of the presented design can provide the same stiffness but allows a drastic reduction of structural material and thus less neutron absorption. Finite element analyses are used to verify the required stiffness, to identify stress concentrations and to optimize the design. (authors)

  9. Design of a mixed recharge with MOX assemblies of greater relation of moderation for a BWR reactor

    International Nuclear Information System (INIS)

    Ramirez S, J.R.; Alonso V, G.; Palacios H, J.

    2004-01-01

    The study of the fuel of mixed oxides of uranium and plutonium (MOX) it has been topic of investigation in many countries of the world and those are even discussed in many places the benefits of reprocessing the spent fuel to extract the plutonium created during the irradiation of the fuel in the nuclear power reactors. At the moment those reactors that have been loaded partially with MOX fuel, are mainly of the type PWR where a mature technology has been achieved in some countries like they are France, Belgium and England, however the experience with reactors of the type BWR is more limited and it is continued studying the best way to introduce this type of fuel in BWRs, one of the main problems to introduce MOX in reactors BWR is the neutronic design of the same one, existing different concepts to introduce the plutonium in the assemblies of fuel and one of them is the one of increasing the relationship of moderation of the assemble. In this work a MOX fuel assemble design is presented and the obtained results so far in the ININ. These results indicate that the investigated concept has some exploitable advantages in the use of the MOX fuel. (Author)

  10. Judgement on the data for fuel assembly outlet temperatures of WWER fuel assemblies in power reactors based on measurements with experimental fuel assemblies

    International Nuclear Information System (INIS)

    Krause, F.

    1986-01-01

    In the period from 1980 to 1985, in the Rheinsberg nuclear power plant experimental fuel assemblies were used on lattices at the periphery of the core. These particular fuel assemblies dispose of an extensive in-core instrumentation with different sensors. Besides this, they are fit out with a device to systematically thottle the coolant flow. The large power gradient present at the core position of the experimental fuel assembly causes a temperature profile along the fuel assemblies which is well provable at the measuring points of the outlet temperature. Along the direction of flow this temperature profile in the coolant degrades only slowly. This effect is to be taken into account when measuring the fuel assembly outlet temperature of WWER fuel assemblies. Besides this, the results of the measurements hinted both at a γ-heating of the temperature measuring points and at tolerances in the calculation of the micro power density distribution. (author)

  11. RA reactor operation and maintenance in 1994, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1994. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Mikic, N; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1994-12-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Zavrseni su radovi na izgradnji sistema za udesno hladjenje, rekonstrukciji postojeceg sistema specijalne ventilacije i rekonstrukciji sistema za napajanje elektricnom energijom. Zapoceti su radovi na modernizaciji, odnosno zameni instrumentacije reaktora ali njegova realizacija kasni

  12. Removable top nozzle and tool for a nuclear reactor fuel assembly

    International Nuclear Information System (INIS)

    Wilson, J.F.; Cerni, S.; Gjertsen, R.K.

    1986-01-01

    A fuel assembly is described for a nuclear reactor including a bottom nozzle, at least one longitudinally extending control rod guide thimble having an upper end and a lower end being attached to the bottom nozzle and projecting upwardly therefrom, transverse grids axially spaced along-the thimble for supporting an array of upstanding fuel rods, and a top nozzle subassembly removable mounted on the upper end of the guide thimble for obtaining top access to the fuel rods upon removal thereof. The top nozzle subassembly consists of: (a) a section integrally formed on the upper end of the guide thimble and having external threads thereon; (b) a lower adapter plate having a guide thimble hole for receiving the guide thimble so as to mount the adapter plate on the guide thimble for slidable movement therealong; (c) a retainer mounted on the guide thimble for restably supporting and limiting the downward movement of the adapter plate along the guide thimble; (d) an upper hold-down plate having a guide thimble passageway with an internal ledge for receiving the thimble so as to mount the hold-down plate on the thimble for slidable movement therealong; (e) spring means interposed between the upper hold-down plate and the lower adapter plate for biasing the hold-down plate upwardly when a downward force is applied thereon whereby the downward force is yieldably transmitted to the fuel assembly; and (f) a collar disposed within the passageway and in abutment with the ledge, the collar having an internal threaded section engageable with the externally threaded section to move the hold-down plate down against the spring means and thereby mounting of the subassembly on the guide thimble

  13. Thermal-hydraulic numerical simulation of fuel sub-assembly for Sodium-cooled Fast Reactor

    International Nuclear Information System (INIS)

    Saxena, Aakanksha

    2014-01-01

    The thesis focuses on the numerical simulation of sodium flow in wire wrapped sub-assembly of Sodium-cooled Fast Reactor (SFR). First calculations were carried out by a time averaging approach called RANS (Reynolds- Averaged Navier-Stokes equations) using industrial code STAR-CCM+. This study gives a clear understanding of heat transfer between the fuel pin and sodium. The main variables of the macroscopic flow are in agreement with correlations used hitherto. However, to obtain a detailed description of temperature fluctuations around the spacer wire, more accurate approaches like LES (Large Eddy Simulation) and DNS (Direct Numerical Simulation) are clearly needed. For LES approach, the code TRIO U was used and for the DNS approach, a research code was used. These approaches require a considerable long calculation time which leads to the need of representative but simplified geometry. The DNS approach enables us to study the thermal hydraulics of sodium that has very low Prandtl number inducing a very different behavior of thermal field in comparison to the hydraulic field. The LES approach is used to study the local region of sub-assembly. This study shows that spacer wire generates the local hot spots (∼20 C) on the wake side of spacer wire with respect to the sodium flow at the region of contact with the fuel pin. Temperature fluctuations around the spacer wire are low (∼1 C-2 C). Under nominal operation, the spectral analysis shows the absence of any dominant peak for temperature oscillations at low frequency (2-10 Hz). The obtained spectra of temperature oscillations can be used as an input for further mechanical studies to determine its impact on the solid structures. (author) [fr

  14. Development and characterization of the control assembly system for the large 2400 MWth Generation IV gas-cooled fast reactor

    International Nuclear Information System (INIS)

    Girardin, G.; Rimpault, G.; Morin, F.; Bosq, J.C.; Coddington, P.; Mikityuk, K.; Chawla, R.

    2008-01-01

    The present paper is related to the design and neutronic characterization of the principal control assembly system for the reference large (2400 MWth) Generation IV gas-cooled fast reactor (GFR), which makes use of ceramic-ceramic (CERCER) plate-type fuel-elements with (U-Pu) carbide fuel contained within a SiC inert matrix. For the neutronic calculations, the deterministic code system ERANOS-2.0 has been used, in association with a full core model including a European fast reactor (EFR)-type pattern for the control assemblies as a starting point. More specifically, the core contains a total of 33 control (control system device: CSD) and safety (diverse safety device: DSD) assemblies implemented in three banks. In the design of the new control assembly system, particular attention was given to the heat generation within the assemblies, so that both neutronic and thermal-hydraulic constraints could be appropriately accounted for. The thermal-hydraulic calculations have been performed with the code COPERNIC, significant coolant mass flow rates being found necessary to maintain acceptable cladding temperatures of the absorber pins. Complementary to the design study, neutronic investigations have been performed to assess the impact of the control assemblies in the GFR core in greater detail (rod interactions, shift of the flux, peaking factors, etc.). Thus, considerable shadowing effects have been observed between the first bank and the safety bank, as also between individual assemblies within the first bank. Large anti-shadowing effects also occur, the most prominent being that between the two CSD banks, where the total assembly worth is almost doubled in comparison to the sum of the individual values. Additional investigations have been performed and, in this context, it has been found that computation of the first-order eigenvalue and the eigenvalue separation is a robust tool to anticipate control assembly interactions in a large fast-spectrum core. One interesting

  15. RA Reactor operation and maintenance (I-IX), part VIII, Task 3.08/05, Decontamination of the reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    Permanent increase of radiation in the heavy water system was noticed during first three year of the RA reactor operation, even when the reactor was shutdown. It was found that there was no failure of the fuel element cladding. Radioactive cobalt was found in the heavy water which was rather strange. During repair of the heavy water system, it has been found that stellite was used for coating the heavy water pumps. Since stellite is a cobalt alloy, this could have been the source of radioactive cobalt in the heavy water. The stellite coating was damaged due to friction and particle of cobalt appeared in the coolant, they were activated since they were in the core. decontamination of the heavy water and the heavy water coolant loop was a must . Beside the detailed report on the contamination and decontamination of the heavy water system this volume includes 14 annexes describing the investigation of the event and the whole procedure of decontamination

  16. Numerical investigation of a heat transfer within the prismatic fuel assembly of a very high temperature reactor

    International Nuclear Information System (INIS)

    Tak, Nam-il; Kim, Min-Hwan; Lee, Won Jae

    2008-01-01

    The complex geometry of the hexagonal fuel blocks of the prismatic fuel assembly in a very high temperature reactor (VHTR) hinders accurate evaluations of the temperature profile within the fuel assembly without elaborate numerical calculations. Therefore, simplified models such as a unit cell model have been widely applied for the analyses and designs of prismatic VHTRs since they have been considered as effective approaches reducing the computational efforts. In a prismatic VHTR, however, the simplified models cannot consider a heat transfer within a fuel assembly as well as a coolant flow through a bypass gap between the fuel assemblies, which may significantly affect the maximum fuel temperature. In this paper, a three-dimensional computational fluid dynamics (CFD) analysis has been carried out on a typical fuel assembly of a prismatic VHTR. Thermal behaviours and heat transfer within the fuel assembly are intensively investigated using the CFD solutions. In addition, the accuracy of the unit cell approach is assessed against the CFD solutions. Two example situations are illustrated to demonstrate the deficiency of the unit cell model caused by neglecting the effects of the bypass gap flow and the radial power distribution within the fuel assembly

  17. Statistical analysis of the vibration loading of the reactor internals and fuel assemblies of reactor units type WWER-440 from deferent projects

    International Nuclear Information System (INIS)

    Ovcharov, O.; Pavelko, V.; Usanov, A.; Arkadov, G.; Dolgov, A.; Molchanov, V.; Anikeev, J.; Pljush, A.

    2006-01-01

    In this paper the following items have been presented: 1) Vibration noise instrument channels; 2) Vibration loading characteristics of control assemblies, internals and design peculiarities of internals of WWER-440 deferent projects; 3) Coolant flow rate through the reactor, reactor core, fuel assemblies and control assemblies for different projects WWER-440 and 4) Noise measurements of coolant speed per channel. The change of auto power spectrum density of absolute displacement detector signal for the last 12 years of SUS monitoring of the Kola NPP unit 2; the coherence functions groups between two SPND of the same level for the Kola NPP unit 1; the measured coolant flow rate at Paks NPP and the auto power spectrum density group of SPND signals from 11 neutron measuring channels of the Kola NPP unit 1 are given. The main factors of vibration loading of internals and fuel assemblies for Kola NPP units 1-4, Bohunice NPP units 1 and 2 and Novovoronezh NPP units 3 and 4 are also discussed

  18. Maintenance for power conversion system of gas turbine high temperature reactor (GTHTR300). Contract research

    Energy Technology Data Exchange (ETDEWEB)

    Kosugiyama, Shinichi; Takada, Shoji; Katanishi, Shoji; Yan, Xing; Takizuka, Takakazu; Kunitomi, Kazuhiko [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment

    2002-11-01

    In order to be a suitable next generation nuclear power plant from reliable and economical points of view, it is necessary for GTHTR300 to have good maintenability and inspectability. Appropriate maintenance concept for the power conversion system of GTHTR300 consisting of a gas turbine, a compressor, a generator, a recuperator, a precooler and so on was studied based on results of the basic design of GTHTR300 in fiscal 2001. Considering degradation phenomena which could occur on each objective equipment, it is technically possible to reduce several maintenance items and extend maintenance interval for some equipment compared to those for existing LWR power plants and combined cycle fossil power plants. But owing to structural feature and installed location of each equipment, and fission product plate-out on each equipment, it became clear that some problems must be solved for making the maintenance works realistic and efficient. Solving the problems and confirming appropriateness of the proposed maintenance concept and plans will be done in coming detailing work of GTHTR300 design. (author)

  19. CO2 Reduction Assembly Prototype Using Microlith-Based Sabatier Reactor for Ground Demonstration

    Science.gov (United States)

    Junaedi, Christian; Hawley, Kyle; Walsh, Dennis; Roychoudhury, Subir; Abney, Morgan B.; Perry, Jay L.

    2014-01-01

    The utilization of CO2 to produce life support consumables, such as O2 and H2O, via the Sabatier reaction is an important aspect of NASA's cabin Atmosphere Revitalization System (ARS) and In-Situ Resource Utilization (ISRU) architectures for both low-earth orbit and long-term manned space missions. Carbon dioxide can be reacted with H2, obtained from the electrolysis of water, via Sabatier reaction to produce methane and H2O. Methane can be stored and utilized as propellant while H2O can be either stored or electrolyzed to produce oxygen and regain the hydrogen atoms. Depending on the application, O2 can be used to replenish the atmosphere in human-crewed missions or as an oxidant for robotic and return missions. Precision Combustion, Inc. (PCI), with support from NASA, has previously developed an efficient and compact Sabatier reactor based on its Microlith® catalytic technology and demonstrated the capability to achieve high CO2 conversion and CH4 selectivity (i.e., =90% of the thermodynamic equilibrium values) at high space velocities and low operating temperatures. This was made possible through the use of high-heat-transfer and high-surface-area Microlith catalytic substrates. Using this Sabatier reactor, PCI designed, developed, and demonstrated a stand-alone CO2 Reduction Assembly (CRA) test system for ground demonstration and performance validation. The Sabatier reactor was integrated with the necessary balance-of-plant components and controls system, allowing an automated, single "push-button" start-up and shutdown. Additionally, the versatility of the test system prototype was demonstrated by operating it under H2-rich (H2/CO2 of >4), stoichiometric (ratio of 4), and CO2-rich conditions (ratio of <4) without affecting its performance and meeting the equilibrium-predicted water recovery rates. In this paper, the development of the CRA test system for ground demonstration will be discussed. Additionally, the performance results from testing the system at

  20. Study of short-time mechanical properties changes for BN-350 reactor spent fuel assemblies jacket material from vacancy swelling

    International Nuclear Information System (INIS)

    Karaulov, V.N.; Blynskij, A.P.; Yakovlev, I.L.; Golovin, S.V.; Lambert, D.

    1999-01-01

    Variations of mechanical properties (ultimate strength and limit of plasticity) for irradiated stainless steels, materials of BN-350 reactor cased fuel assemblies tubes, namely: 12X18H10T MTO, 08X16H11M3 MTO, 10X17H13M2T, 12X13M2BRF from vacancy swelling and neutron damaging doze have been studied. Flat samples cut out from hexagonal fuel assemblies casing were tested. The data on casing profilometry, and also the results from hydrostatic weighing of steel samples, were used to evaluate swelling. All measurements and testing were made at temperature 25 degrees C