WorldWideScience

Sample records for reach maximum contraction

  1. Restoring Maximum Vertical Browsing Reach in Sauropod Dinosaurs.

    Science.gov (United States)

    Paul, Gregory S

    2017-10-01

    The ongoing controversy centered on neck posture and function in sauropod dinosaurs is misplaced for a number of reasons. Because of an absence of pertinent data it is not possible to accurately restore the posture and range of motion in long necked fossil animals, only gross approximations are possible. The existence of a single "neutral posture" in animals with long, slender necks may not exist, and its relationship to feeding habits is weak. Restorations of neutral osteological neck posture based on seemingly detailed diagrams of cervical articulations are not reliable because the pictures are not sufficiently accurate due to a combination of illustration errors, and distortion of the fossil cervicals. This is all the more true because fossil cervical series lack the critical inter-centra cartilage. Maximum vertical reach is more readily restorable and biologically informative for long necked herbivores. Modest extension of 10° between each caudal cervical allowed high shouldered sauropods to raise the cranial portion of their necks to vertical postures that allowed them to reach floral resources far higher than seen in the tallest mammals. This hypothesis is supported by the dorsally extended articulation of the only known co-fused sauropod cervicals. Many sauropods appear to have been well adapted for rearing in order to boost vertical reach, some possessed retroverted pelves that may have allowed them to walk slowly while bipedal. A combination of improved high browsing abilities and sexual selection probably explains the unusually long necks of tall ungulates and super tall sauropods. Anat Rec, 2017. © 2017 Wiley Periodicals, Inc. Anat Rec, 300:1802-1825, 2017. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  2. Detection of surface electromyography recording time interval without muscle fatigue effect for biceps brachii muscle during maximum voluntary contraction.

    Science.gov (United States)

    Soylu, Abdullah Ruhi; Arpinar-Avsar, Pinar

    2010-08-01

    The effects of fatigue on maximum voluntary contraction (MVC) parameters were examined by using force and surface electromyography (sEMG) signals of the biceps brachii muscles (BBM) of 12 subjects. The purpose of the study was to find the sEMG time interval of the MVC recordings which is not affected by the muscle fatigue. At least 10s of force and sEMG signals of BBM were recorded simultaneously during MVC. The subjects reached the maximum force level within 2s by slightly increasing the force, and then contracted the BBM maximally. The time index of each sEMG and force signal were labeled with respect to the time index of the maximum force (i.e. after the time normalization, each sEMG or force signal's 0s time index corresponds to maximum force point). Then, the first 8s of sEMG and force signals were divided into 0.5s intervals. Mean force, median frequency (MF) and integrated EMG (iEMG) values were calculated for each interval. Amplitude normalization was performed by dividing the force signals to their mean values of 0s time intervals (i.e. -0.25 to 0.25s). A similar amplitude normalization procedure was repeated for the iEMG and MF signals. Statistical analysis (Friedman test with Dunn's post hoc test) was performed on the time and amplitude normalized signals (MF, iEMG). Although the ANOVA results did not give statistically significant information about the onset of the muscle fatigue, linear regression (mean force vs. time) showed a decreasing slope (Pearson-r=0.9462, pfatigue starts after the 0s time interval as the muscles cannot attain their peak force levels. This implies that the most reliable interval for MVC calculation which is not affected by the muscle fatigue is from the onset of the EMG activity to the peak force time. Mean, SD, and range of this interval (excluding 2s gradual increase time) for 12 subjects were 2353, 1258ms and 536-4186ms, respectively. Exceeding this interval introduces estimation errors in the maximum amplitude calculations

  3. Time at which the maximum of a random acceleration process is reached

    International Nuclear Information System (INIS)

    Majumdar, Satya N; Rosso, Alberto; Zoia, Andrea

    2010-01-01

    We study the random acceleration model, which is perhaps one of the simplest, yet nontrivial, non-Markov stochastic processes, and is key to many applications. For this non-Markov process, we present exact analytical results for the probability density p(t m |T) of the time t m at which the process reaches its maximum, within a fixed time interval [0, T]. We study two different boundary conditions, which correspond to the process representing respectively (i) the integral of a Brownian bridge and (ii) the integral of a free Brownian motion. Our analytical results are also verified by numerical simulations.

  4. Revenue-Sharing Contract Models for Logistics Service Supply Chains with Mass Customization Service

    Directory of Open Access Journals (Sweden)

    Weihua Liu

    2015-01-01

    Full Text Available The revenue-sharing contract is one of the most important supply chain coordination contracts; it has been applied in various supply chains. However, studies related to service supply chains with mass customization (MC are lacking. Considering the equity of benefit distribution between the members of service supply chains, in this paper, we designed two revenue-sharing contracts. The first contract for the maximum equity of a single logistics service integrator (LSI and single functional logistics service provider (FLSP in a two-echelon logistics service supply chain was designed by introducing the fair entropy function (“one to one” model. Furthermore, the method is extended to a more complex supply chain, which consists of a single LSI and multiple FLSPs. A new contract was designed not only for considering the equity of an LSI and each FLSP but also for the equity between each FLSP (“one to N” model. The “one to one” model in three-echelon LSSC is also provided. The result exemplifies that, whether in the “one to one” model or “one to N” model, there exists a best interval of customized level when the revenue-sharing coefficient reaches its maximum.

  5. Correlation between maximum voluntary contraction and endurance measured by digital palpation and manometry: An observational study

    Directory of Open Access Journals (Sweden)

    Fátima Faní Fitz

    Full Text Available Summary Introduction: Digital palpation and manometry are methods that can provide information regarding maximum voluntary contraction (MVC and endurance of the pelvic floor muscles (PFM, and a strong correlation between these variables can be expected. Objective: To investigate the correlation between MVC and endurance, measured by digital palpation and manometry. Method: Forty-two women, with mean age of 58.1 years (±10.2, and predominant symptoms of stress urinary incontinence (SUI, were included. Examination was firstly conducted by digital palpation and subsequently using a Peritron manometer. MVC was measured using a 0-5 score, based on the Oxford Grading Scale. Endurance was assessed based on the PERFECT scheme. Results: We found a significant positive correlation between the MVC measured by digital palpation and the peak manometric pressure (r=0.579, p<0.001, and between the measurements of the endurance by Peritron manometer and the PERFECT assessment scheme (r=0.559, P<0.001. Conclusion: Our results revealed a positive and significant correlation between the capacity and maintenance of PFM contraction using digital and manometer evaluations in women with predominant symptoms of SUI.

  6. A comparison of two gluteus maximus EMG maximum voluntary isometric contraction positions

    Directory of Open Access Journals (Sweden)

    Bret Contreras

    2015-09-01

    Full Text Available Background. The purpose of this study was to compare the peak electromyography (EMG of the most commonly-used position in the literature, the prone bent-leg (90° hip extension against manual resistance applied to the distal thigh (PRONE, to a novel position, the standing glute squeeze (SQUEEZE.Methods. Surface EMG electrodes were placed on the upper and lower gluteus maximus of thirteen recreationally active females (age = 28.9 years; height = 164 cm; body mass = 58.2 kg, before three maximum voluntary isometric contraction (MVIC trials for each position were obtained in a randomized, counterbalanced fashion.Results. No statistically significant (p < 0.05 differences were observed between PRONE (upper: 91.94%; lower: 94.52% and SQUEEZE (upper: 92.04%; lower: 85.12% for both the upper and lower gluteus maximus. Neither the PRONE nor SQUEEZE was more effective between all subjects.Conclusions. In agreement with other studies, no single testing position is ideal for every participant. Therefore, it is recommended that investigators employ multiple MVIC positions, when possible, to ensure accuracy. Future research should investigate a variety of gluteus maximus MVIC positions in heterogeneous samples.

  7. 24 CFR 242.52 - Construction contracts.

    Science.gov (United States)

    2010-04-01

    ...; a construction management contract with a guaranteed maximum price, the final costs of which are... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Construction contracts. 242.52... MORTGAGE INSURANCE FOR HOSPITALS Construction § 242.52 Construction contracts. (a) Awarding of contract. A...

  8. Effects of aluminum hinged shoes on the structure of contracted feet in Thoroughbred yearlings.

    Science.gov (United States)

    Tanaka, Kousuke; Hiraga, Atsushi; Takahashi, Toshiyuki; Kuwano, Atsutoshi; Morrison, Scott Edward

    2015-01-01

    We applied aluminum hinged shoes (AHSs) to the club foot-associated contracted feet of 11 Thoroughbred yearlings to examine the effects of the shoes on the shape of the hoof and third phalanx (P III). After 3 months of AHS use, the size of the affected hooves increased significantly, reaching the approximate size of the healthy contralateral hooves with respect to the maximum lateral width of the foot, the mean ratio of the bearing border width to the coronary band width, and the mean ratio of the solar surface width to the articular surface width. These results suggest that the AHSs corrected the contracted feet in these yearling horses.

  9. Contract types for nuclear power projects, non-turnkey type contracts in particular

    International Nuclear Information System (INIS)

    Nyte'n, T.

    1975-01-01

    A non-turnkey contract differs from a turnkey contract in no special formal way. The way the buyer chooses to exercise his project leadership must be concretized in the contract. The way and extent he wishes to exercise technical checking must be laid down in the form of clear rules. The way information has to flow from one contractor over buyer to others and vice versa has to be laid down in detail and the consequences of non conformance fixed in such a manner that optimum project performance is reached. (orig./FW) [de

  10. Effects of aluminum hinged shoes on the structure of contracted feet in Thoroughbred yearlings

    OpenAIRE

    TANAKA, Kousuke; HIRAGA, Atsushi; TAKAHASHI, Toshiyuki; KUWANO, Atsutoshi; MORRISON, Scott Edward

    2015-01-01

    ABSTRACT We applied aluminum hinged shoes (AHSs) to the club foot-associated contracted feet of 11 Thoroughbred yearlings to examine the effects of the shoes on the shape of the hoof and third phalanx (P III). After 3 months of AHS use, the size of the affected hooves increased significantly, reaching the approximate size of the healthy contralateral hooves with respect to the maximum lateral width of the foot, the mean ratio of the bearing border width to the coronary band width, and the mea...

  11. Legal Considerations for International Collaborative Research Contract

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Kim, H. J.; Lee, J. H.

    2007-01-01

    Though collaborative research is pure academic activity the research plan and resource allocation for the research are shaped under foam of contract. Thus, legal binding effect and compulsive instrument is adopted at the research contract. This paper aimed at guiding equal collaborative research contract in legal aspect. To reach the goal (1) enforceability and elements of international collaborative contract, (2) damage calculation and related issues with those topics shall be discussed in each section

  12. Temporary labour contracts

    CERN Document Server

    2000-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L 021/PE, L 022/PE, L 023/PE and L 024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) reached the end of their initial three-year contractual period at the end of December 1999. At CERN?s request, in September 1999 the Finance Committee approved an extension of these contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs (CERN/FC/4196). In December 1999, one of the five contractors, FIRCROFT, withdrew from its contract for 2000. Following the satisfactory execution of the four remaining contracts during 2000, CERN requests approval to extend them from January 2001 for the second of the two optional years provided for in the original adjudication. The Finance Committee is invited to approve the extension of the existing contracts until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices.

  13. Energetic aspects of skeletal muscle contraction: implications of fiber types.

    Science.gov (United States)

    Rall, J A

    1985-01-01

    In this chapter fundamental energetic properties of skeletal muscles as elucidated from isolated muscle preparations are described. Implications of these intrinsic properties for the energetic characterization of different fiber types and for the understanding of locomotion have been considered. Emphasis was placed on the myriad of physical and chemical techniques that can be employed to understand muscle energetics and on the interrelationship of results from different techniques. The anaerobic initial processes which liberate energy during contraction and relaxation are discussed in detail. The high-energy phosphate (approximately P) utilized during contraction and relaxation can be distributed between actomyosin ATPase or cross-bridge cycling (70%) and the Ca2+ ATPase of the sacroplasmic reticulum (30%). Muscle shortening increases the rate of approximately P hydrolysis, and stretching a muscle during contraction suppresses the rate of approximately P hydrolysis. The economy of an isometric contraction is defined as the ratio of isometric mechanical response to energetic cost and is shown to be a fundamental intrinsic parameter describing muscle energetics. Economy of contraction varies across the animal kingdom by over three orders of magnitude and is different in different mammalian fiber types. In mammalian skeletal muscles differences in economy of contraction can be attributed mainly to differences in the specific actomyosin and Ca2+ ATPase of muscles. Furthermore, there is an inverse relationship between economy of contraction and maximum velocity of muscle shortening (Vmax) and maximum power output. This is a fundamental relationship. Muscles cannot be economical at developing and maintaining force and also exhibit rapid shortening. Interestingly, there appears to be a subtle system of unknown nature that modulates the Vmax and economy of contraction. Efficiency of a work-producing contraction is defined and contrasted to the economy of contraction

  14. Temporary labour contracts

    CERN Document Server

    1999-01-01

    The five contracts for Temporary Labour assignments on the CERN site (L020/PE, L021/PE, L022/PE, L023/PE and L024/PE) approved by the Finance Committee in March 1996 (CERN/FC/3857) will reach the end of their initial three-year contractual period at the end of December 1999. Following the satisfactory execution of these contracts during this period, CERN requests approval to extend them from January 2000 for the first of the two years foreseen in the original adjudication. The Finance Committee is invited: - to take note that the three-year expenditure for Temporary Labour contracts from 1997 to 1999 will not exceed 19 100 000 Swiss francs, compared to the 18 900 000 Swiss francs estimated at the time of the adjudication in March 1996; - to approve an extension of the present Temporary Labour contracts for the year 2000 for a total amount not exceeding 6 000 000 Swiss francs.

  15. Optimal Lease Contract for Remanufactured Equipment

    Science.gov (United States)

    Iskandar, B. P.; Wangsaputra, R.; Pasaribu, U. S.; Husniah, H.

    2018-03-01

    In the last two decades, the business of lease products (or equipment) has grown significantly, and many companies acquire equipment through leasing. In this paper, we propose a new lease contract under which a product (or equipment) is leased for a period of time with maximum usage per period (e.g. 1 year). This lease contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the customer (as a lessee) will be charged an additional cost. In general, the lessor (OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. It is considered that the lessor offers the lease contract for a remanufactured product. We presume that the price of the lease contract for the remanufactured product is much lower than that of a new one, and hence it would be a more attractive option to the customer. The decision problem for the lessee is to select the best option offered that fits to its requirement, and the decision problem for the lessor is find the optimal maintenance efforts for a given price of the lease option offered. We first find the optimal decisions independently for each party, and then the joint optimal decisions for both parties.

  16. ENFORCEMENT OF MORTGAGE CONTRACT

    Directory of Open Access Journals (Sweden)

    Alisa A. BELU

    2016-07-01

    Full Text Available A chattel mortgage contract is the expression of a real guarantee that gives the creditor precedence over other creditors, in addition to the general pledge upon the belongings of the debtor. It refers to the sale of mortgaged movable assets, exclusively or prioritized in favor of the mortgaging creditor, in case the debtor does not comply with his / her commitments, under the signed mortgage contract. Beginning from this purpose, shared by both sides (as the chattel mortgage contract is synallagmatic, in case the debtor is unable to fulfill his / her commitments, the sides reach a situation of enforcement of the signed chattel mortgage contract. Given the legal status of the chattel mortgage contract [Art. 2387-2477 Noul Cod Civil , Universul Juridic, Bucureşti, 2016, ISBN 978-606-673-792-0], the principle of binding force of the contract and the principle according to which signed legal conventions will entail legal effects, the Romanian law maker developed the proper legal framework for the enforcement of the chattel mortgage contract. [art. 622 si urm. Noul Cod de Procedură Civilă, ed. Hamangiu, Bucureşti, 2016, ISBN 978-606-27-0459-9].

  17. Defense Contracting: Use of Undefinitized Contract Actions Understand and Definitization Time Frames Often Not Met

    National Research Council Canada - National Science Library

    2007-01-01

    ...), which authorize contractors to begin work before reaching a final agreement on contract terms. The contractor has little incentive to control costs during this period, creating a potential for wasted taxpayer dollars...

  18. Maximum swimming speeds of sailfish and three other large marine predatory fish species based on muscle contraction time and stride length: a myth revisited

    Directory of Open Access Journals (Sweden)

    Morten B. S. Svendsen

    2016-10-01

    Full Text Available Billfishes are considered to be among the fastest swimmers in the oceans. Previous studies have estimated maximum speed of sailfish and black marlin at around 35 m s−1 but theoretical work on cavitation predicts that such extreme speed is unlikely. Here we investigated maximum speed of sailfish, and three other large marine pelagic predatory fish species, by measuring the twitch contraction time of anaerobic swimming muscle. The highest estimated maximum swimming speeds were found in sailfish (8.3±1.4 m s−1, followed by barracuda (6.2±1.0 m s−1, little tunny (5.6±0.2 m s−1 and dorado (4.0±0.9 m s−1; although size-corrected performance was highest in little tunny and lowest in sailfish. Contrary to previously reported estimates, our results suggest that sailfish are incapable of exceeding swimming speeds of 10-15 m s−1, which corresponds to the speed at which cavitation is predicted to occur, with destructive consequences for fin tissues.

  19. The missing link between maintenance contracts and flexible asset management

    OpenAIRE

    Marttonen-Arola, Salla; Viskari, Sari; Kärri, Timo

    2013-01-01

    The paper shows how additional value can be created in maintenance collaboration through integrating the features of flexible asset management into maintenance contracts. We expand the traditional typology of maintenance contracts and introduce a new contract type, flexible asset management contracts. Also value sharing in the new contract type is discussed. Our logic for sharing the value is based on reaching for win-win situations in industrial maintenance collaboration. Finally, we present...

  20. Contract policy for CERN staff members

    CERN Multimedia

    HR Department

    2009-01-01

    Public information meeting on Monday 28 September 2009 at 10.00 a.m. With effect from 1 August 2009, new provisions regarding staff employment contract policy have entered into force. These provisions are set out in: The Staff Rules and Regulations and Administrative Circular No. 2 (Rev. 4). Further details are available in: Frequently Asked Questions. The new provisions are outlined below: Limited-duration contracts From 1 August 2009, limited-duration contracts will be awarded for a maximum period of five years (instead of four years previously) and no extensions beyond five years will be granted. Contracts for periods shorter than five years can be exceptionally awarded, e.g. for a project whose mission or financial resources are time-limited. Indefinite contracts : award procedure A number of changes have been introduced regarding the procedure for the award of indefinite contracts. From now on, posts leading to the award of an indefinite contract will be opened at le...

  1. Revealing the Maximum Strength in Nanotwinned Copper

    DEFF Research Database (Denmark)

    Lu, L.; Chen, X.; Huang, Xiaoxu

    2009-01-01

    boundary–related processes. We investigated the maximum strength of nanotwinned copper samples with different twin thicknesses. We found that the strength increases with decreasing twin thickness, reaching a maximum at 15 nanometers, followed by a softening at smaller values that is accompanied by enhanced...

  2. 48 CFR 39.103 - Modular contracting.

    Science.gov (United States)

    2010-10-01

    ... the Government is not required to procure additional increments. (e) To avoid obsolescence, a modular... maximum extent practicable, deliveries under the contract should be scheduled to occur within 18 months...

  3. Did We Say That? Consumerism and Contract Law.

    Science.gov (United States)

    Nordin, Virginia Davis

    1982-01-01

    The dominant emerging concept in academic contract theory is that the student-college relationship is not a commercially binding contract but a more flexible quasi-contractual relationship. It allows the university maximum control of the relationship on a continuing basis, allows development of some student rights, and combines traditional and…

  4. 29 CFR 4.118 - Contracts for carriage subject to published tariff rates.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.118 Contracts for carriage... carriage. The contracts excluded from the reach of the Act by this exemption are typically those where... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for carriage subject to published tariff rates. 4...

  5. How to evaluate and compare maintenance contracts: a checklist.

    Science.gov (United States)

    Gustine, S M; Young, P

    1986-07-01

    Several factors need to be considered when comparing computerized tomography (CT) maintenance contracts. Five areas in particular require careful review to ensure that an institution is getting maximum value for its contract dollars: the credibility of the servicing company; the servicing engineer's qualifications and commitments; a thorough understanding of contract terminology; accurate analysis standards; and professionalism. The following article examines each of these areas in closer detail.

  6. Simulation of a chain of collapsible contracting lymphangions with progressive valve closure.

    Science.gov (United States)

    Bertram, C D; Macaskill, C; Moore, J E

    2011-01-01

    The aim of this investigation was to achieve the first step toward a comprehensive model of the lymphatic system. A numerical model has been constructed of a lymphatic vessel, consisting of a short series chain of contractile segments (lymphangions) and of intersegmental valves. The changing diameter of a segment governs the difference between the flows through inlet and outlet valves and is itself governed by a balance between transmural pressure and passive and active wall properties. The compliance of segments is maximal at intermediate diameters and decreases when the segments are subject to greatly positive or negative transmural pressure. Fluid flow is the result of time-varying active contraction causing diameter to reduce and is limited by segmental viscous and valvular resistance. The valves effect a smooth transition from low forward-flow resistance to high backflow resistance. Contraction occurs sequentially in successive lymphangions in the forward-flow direction. The behavior of chains of one to five lymphangions was investigated by means of pump function curves, with variation of valve opening parameters, maximum contractility, lymphangion size gradation, number of lymphangions, and phase delay between adjacent lymphangion contractions. The model was reasonably robust numerically, with mean flow-rate generally reducing as adverse pressure was increased. Sequential contraction was found to be much more efficient than synchronized contraction. At the highest adverse pressures, pumping failed by one of two mechanisms, depending on parameter settings: either mean leakback flow exceeded forward pumping or contraction failed to open the lymphangion outlet valve. Maximum pressure and maximum flow-rate were both sensitive to the contractile state; maximum pressure was also determined by the number of lymphangions in series. Maximum flow-rate was highly sensitive to the transmural pressure experienced by the most upstream lymphangions, suggesting that many

  7. Children's Visual Processing of Egocentric Cues in Action Planning for Reach

    Science.gov (United States)

    Cordova, Alberto; Gabbard, Carl

    2011-01-01

    In this study the authors examined children's ability to code visual information into an egocentric frame of reference for planning reach movements. Children and adults estimated reach distance via motor imagery in immediate and response-delay conditions. Actual maximum reach was compared to estimates in multiple locations in peripersonal and…

  8. Increase of the contract amounts for LHC civil-engineering construction and civil-engineering consultancy contracts

    CERN Document Server

    2005-01-01

    This document concerns the increase of the contract amounts for LHC civil-engineering construction and civil-engineering consultancy, Package 2. The Finance Committee is invited to take note of the increase of the contract amounts with: - the joint venture DRAGADOS (ES) and SELI (IT) for civil-engineering construction, LHC Package 2, for an amount of 28 087 000 Swiss francs, subject to revision, in the amount previously announced to Finance Committee (CERN/FC/4516) of 132 200 000 Swiss francs, subject to revision, bringing the total to a maximum amount of 160 287 000 Swiss francs, subject to revision. - the joint venture GIBB (GB), GEOCONSULT (AT) and SGI (CH) for the provision of civil-engineering consultancy services, LHC Package 2, for an amount of 900 000 Swiss francs, subject to revision, in the amount previously announced to Finance Committee of 13 800 000 Swiss francs, subject to revision, bringing the total to a maximum amount of 14 700 000 Swiss francs, subject to revision

  9. Game-Theoretic Models for Usage-based Maintenance Contract

    Science.gov (United States)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  10. Belene nuclear power plant contracting approach

    International Nuclear Information System (INIS)

    Tankosic, D.; Mignone, O.

    2004-01-01

    Historically, three main types of project execution and contractual approaches have been applied to energy and industrial projects, including nuclear projects. These approaches are grouped into three broad categories: 1) Turnkey Approach; 2) Split Package (Island) Approach; and 3)Multiple Package Approach. Based on a preliminary screening done by an ongoing feasibility study work for NPP Belene (NEK contract to Parsons E and C), the recommended approach is going to follow that general trend i.e., with some variation between the Split Package and the Turnkey approach. Before deciding on an execution approach or at least before issuing bid specifications for the nuclear power plant, it is prudent, even for a country with existing nuclear power program (like Bulgaria), to re-check/verify capabilities of the interested bidders to handle contracts of this size and nature. During the last decades, nuclear energy went through a substantial restructuring and most of the capabilities (human and financial) that existed before are not any more available. This re-checking should mainly cover the experience of the bidders as regards the design, construction and operation of the stations where they were involved, but also include items such as local experience, capability to bring favorable financing, liability coverage, general background, potential and organizational structures. The advantages and disadvantages for the Owner of the three contracting approaches can be briefly summarized as follows: Turnkey Approach - main advantages: all responsibilities rest in a Contractor or Consortium. Main disadvantages - limited project control by Owner and restricted local participation. For Split Package Contract Approach main advantage are more favorable financing conditions and increased local participation. Main disadvantage is the increased interface problems. For Multiple package Contract Approach main advantages are the opportunity to tailor the plant and maximum increase of local

  11. Systemic inflammatory responses to maximal versus submaximal lengthening contractions of the elbow flexors.

    Science.gov (United States)

    Peake, Jonathan M; Nosaka, Kazunori; Muthalib, Makii; Suzuki, Katsuhiko

    2006-01-01

    We compared changes in markers of muscle damage and systemic inflammation after submaximal and maximal lengthening muscle contractions of the elbow flexors. Using a cross-over design, 10 healthy young men not involved in resistance training completed a submaximal trial (10 sets of 60 lengthening contractions at 10% maximum isometric strength, 1 min rest between sets), followed by a maximal trial (10 sets of three lengthening contractions at 100% maximum isometric strength, 3 min rest between sets). Lengthening contractions were performed on an isokinetic dynamometer. Opposite arms were used for the submaximal and maximal trials, and the trials were separated by a minimum of two weeks. Blood was sampled before, immediately after, 1 h, 3 h, and 1-4 d after each trial. Total leukocyte and neutrophil numbers, and the serum concentration of soluble tumor necrosis factor-alpha receptor 1 were elevated after both trials (P < 0.01), but there were no differences between the trials. Serum IL-6 concentration was elevated 3 h after the submaximal contractions (P < 0.01). The concentrations of serum tumor necrosis factor-alpha, IL-1 receptor antagonist, IL-10, granulocyte-colony stimulating factor and plasma C-reactive protein remained unchanged following both trials. Maximum isometric strength and range of motion decreased significantly (P < 0.001) after both trials, and were lower from 1-4 days after the maximal contractions compared to the submaximal contractions. Plasma myoglobin concentration and creatine kinase activity, muscle soreness and upper arm circumference all increased after both trials (P < 0.01), but were not significantly different between the trials. Therefore, there were no differences in markers of systemic inflammation, despite evidence of greater muscle damage following maximal versus submaximal lengthening contractions of the elbow flexors.

  12. Auditability In The U.S. Navy: A Knowledge Assessment Of The Contracting Workforce

    Science.gov (United States)

    2016-12-01

    contracts, purchasing, management , marketing , quantitative methods or organization and management , a Baccalaureate degree, and one year of contracting...and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...maximum 200 words) The Department of Defense (DOD) has some problems in its contracting workforce that make the department susceptible to

  13. Coalition contract management as a systems change strategy for HIV prevention.

    Science.gov (United States)

    Darrow, William W; Montanea, Julie E; Sánchez-Braña, Elizabeth

    2010-11-01

    Racial and Ethnic Approaches to Community Health (REACH) 2010 provided a unique opportunity for minority community-based organizations (CBOs) to work together to eliminate disparities in HIV disease. A coalition was formed in Broward County to respond to the REACH 2010 program announcement, a university was chosen to coordinate efforts, and contracts were negotiated with CBO partners to develop, implement, and evaluate a community action plan. Contract management provided stability, focus, and a mechanism for coalition partners to measure progress toward achieving project objectives. By emphasizing documentation as well as the delivery of services, however, contract conditions also placed a heavy burden on educational outreach workers, restricted the reimbursable activities of member organizations, and created friction between minority agencies and university staff. Although the coalition met many of its objectives, the introduction and enforcement of a mutually agreed on set of rules and obligations as a way of promoting systems change in Broward County failed to make a lasting impact among community partners. CBOs continued to compete with one another for HIV prevention project funding and stopped collaborating as closely with another when federal support for our REACH 2010 community demonstration project ran out.

  14. Service contract of Renault Kerax 440 truck with deductible and policy limit coverage modification

    Science.gov (United States)

    Bustami, Pasaribu, Udjianna. S.; Husniah, Hennie

    2016-02-01

    In this paper we discuss a service contracts with coverage modification that only offer preventive maintenance and corrective maintenance for Renault Kerax 440 Truck by service contract provider. Corrective maintenance costs is modified with deductible and policy limit during the period of the service contract. Demand for a service contract is only influenced by the price of the service contract, deductible, and policy limit offered by producer to consumer. The main problem in this thesis is determining the price of a service contract, deductible, and policy limit to get maximum profit for producer for each of service contract.

  15. RENEGOTIATION MINING CONTRACT: LEGAL PARADIGM RECONSTRUCTION EFFORTS

    Directory of Open Access Journals (Sweden)

    Marilang -

    2014-07-01

    Full Text Available Renegotiation contract mining is not a priori notion that was born but is driven by the fact that empirical Work Contract (KK and coal mining concessions of the Works Agreement (Cca that are valid for this resulted in profits which are not comparable between countries with investors (domestic and foreign. In addition, Law No. 4 of 2009 about Mineral and Coal Mining (minerba through article 169 have been injected that though the mining contracts during the validity of this, still respected until the end, however, if the implementation of these contracts give rise to distortions for the national interest, then the Government must encourage the investors to do Renegotiation against existing contracts to comply with legislation minerba forever within a period of one year since the enactment of the legislation this minerba. Renegotiation mining contracts that have been approved on the fact of the matter is simply an attempt to reconstruct the ruling paradigm, so with that paradigm shift, both parties can reach the intersection for the benefit of both parties, i.e. the parties proportionately Indonesia suffered no losses on the one hand, and the benefit of the domestic and foreign investors remain in reasonable limits on the other. 

  16. Multidimensional stochastic approximation using locally contractive functions

    Science.gov (United States)

    Lawton, W. M.

    1975-01-01

    A Robbins-Monro type multidimensional stochastic approximation algorithm which converges in mean square and with probability one to the fixed point of a locally contractive regression function is developed. The algorithm is applied to obtain maximum likelihood estimates of the parameters for a mixture of multivariate normal distributions.

  17. Contract theory and EU Contract Law

    OpenAIRE

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories are largely irreconcilable with the contract law of the EU. The paper further addresses the main implications of this mismatch, both for contract theory and for EU contract law. It suggests that in...

  18. Shanghai Futures Exchange Published Draft of Tin and Nickel Futures Contract

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    Shanghai Futures Exchange published draft for soliciting opinions for tin and nickel futures contract on its official website on January 19,which implies the marketing time of the long awaited tin and nickel futures is drawing near.According to the draft for soliciting opinions,the transaction unit of tin futures contract is 1tonne/lot,minimum variation unit is 10 yuan/tonne,daily maximum price fluctuation shall

  19. Contract theory and EU Contract Law

    NARCIS (Netherlands)

    Hesselink, M.W.; Twigg-Flesner, C.

    2016-01-01

    This paper explores the relationship between contract theory and European contract law. In particular, it confronts the leading contract law theories with the main characteristics of EU contract law. The conclusion is that the two do not match well. In particular, monist normative contract theories

  20. Maximum permissible voltage of YBCO coated conductors

    Energy Technology Data Exchange (ETDEWEB)

    Wen, J.; Lin, B.; Sheng, J.; Xu, J.; Jin, Z. [Department of Electrical Engineering, Shanghai Jiao Tong University, Shanghai (China); Hong, Z., E-mail: zhiyong.hong@sjtu.edu.cn [Department of Electrical Engineering, Shanghai Jiao Tong University, Shanghai (China); Wang, D.; Zhou, H.; Shen, X.; Shen, C. [Qingpu Power Supply Company, State Grid Shanghai Municipal Electric Power Company, Shanghai (China)

    2014-06-15

    Highlights: • We examine three kinds of tapes’ maximum permissible voltage. • We examine the relationship between quenching duration and maximum permissible voltage. • Continuous I{sub c} degradations under repetitive quenching where tapes reaching maximum permissible voltage. • The relationship between maximum permissible voltage and resistance, temperature. - Abstract: Superconducting fault current limiter (SFCL) could reduce short circuit currents in electrical power system. One of the most important thing in developing SFCL is to find out the maximum permissible voltage of each limiting element. The maximum permissible voltage is defined as the maximum voltage per unit length at which the YBCO coated conductors (CC) do not suffer from critical current (I{sub c}) degradation or burnout. In this research, the time of quenching process is changed and voltage is raised until the I{sub c} degradation or burnout happens. YBCO coated conductors test in the experiment are from American superconductor (AMSC) and Shanghai Jiao Tong University (SJTU). Along with the quenching duration increasing, the maximum permissible voltage of CC decreases. When quenching duration is 100 ms, the maximum permissible of SJTU CC, 12 mm AMSC CC and 4 mm AMSC CC are 0.72 V/cm, 0.52 V/cm and 1.2 V/cm respectively. Based on the results of samples, the whole length of CCs used in the design of a SFCL can be determined.

  1. Growth and maximum size of tiger sharks (Galeocerdo cuvier) in Hawaii.

    Science.gov (United States)

    Meyer, Carl G; O'Malley, Joseph M; Papastamatiou, Yannis P; Dale, Jonathan J; Hutchinson, Melanie R; Anderson, James M; Royer, Mark A; Holland, Kim N

    2014-01-01

    Tiger sharks (Galecerdo cuvier) are apex predators characterized by their broad diet, large size and rapid growth. Tiger shark maximum size is typically between 380 & 450 cm Total Length (TL), with a few individuals reaching 550 cm TL, but the maximum size of tiger sharks in Hawaii waters remains uncertain. A previous study suggested tiger sharks grow rather slowly in Hawaii compared to other regions, but this may have been an artifact of the method used to estimate growth (unvalidated vertebral ring counts) compounded by small sample size and narrow size range. Since 1993, the University of Hawaii has conducted a research program aimed at elucidating tiger shark biology, and to date 420 tiger sharks have been tagged and 50 recaptured. All recaptures were from Hawaii except a single shark recaptured off Isla Jacques Cousteau (24°13'17″N 109°52'14″W), in the southern Gulf of California (minimum distance between tag and recapture sites  =  approximately 5,000 km), after 366 days at liberty (DAL). We used these empirical mark-recapture data to estimate growth rates and maximum size for tiger sharks in Hawaii. We found that tiger sharks in Hawaii grow twice as fast as previously thought, on average reaching 340 cm TL by age 5, and attaining a maximum size of 403 cm TL. Our model indicates the fastest growing individuals attain 400 cm TL by age 5, and the largest reach a maximum size of 444 cm TL. The largest shark captured during our study was 464 cm TL but individuals >450 cm TL were extremely rare (0.005% of sharks captured). We conclude that tiger shark growth rates and maximum sizes in Hawaii are generally consistent with those in other regions, and hypothesize that a broad diet may help them to achieve this rapid growth by maximizing prey consumption rates.

  2. Nova Scotia electricity market : frameworks for renewable energy contracting and cogeneration contracting : discussion document

    International Nuclear Information System (INIS)

    2006-01-01

    The recent Electricity Marketplace Governance Committee of Nova Scotia report issued a number of recommendations regarding renewable and cogeneration sales to retail consumers, as well as recommendations for top-up, spill rates and back-up rates to complement the operation of independent generating facilities. This discussion paper examined issues which need to be addressed in order to implement the recommendations. The discussion paper also included recommendations relating to the purchase of cogeneration output by the Nova Scotia Power Inc. (NSPI) under long term power purchase agreements. The aim of the paper was to provide a basis for the further discussion of issues in preparation for the development of future rules and regulations. The first part of the document identified ways for buyers and sellers to arrange contracts, as well as issues that need to be addressed at the institutional level to enable arrangements. Options for financial contracts and physical contracts were reviewed.The second part of the document examined pricing issues in the context of both financial and physical contract arrangements. Resolutions for both sets of options were proposed. Energy pricing principles were reviewed, as well as various pricing options and issues related to the analysis of price requirements. It was concluded that in order to support the safe, reliable and economic supply of electricity, the design of the electricity market should enable maximum flexibility in contractual arrangements and facilitate competition in ways that do not harm other parties

  3. Types of contracts and contracting procedures

    International Nuclear Information System (INIS)

    Zijl, N.A. van

    1977-01-01

    Contracting for a nuclear power plant can be carried out in many different ways, from a bilateral agreement between two countries to an international open bidding competition. Also the kind of contracts (turnkey, split-package or multi-contract type) are discussed with their pros and cons as well as the contracting procedures which can be followed to come to the conclusion of a contract. (orig.) [de

  4. The Challenges of the "Software Support for Industrial Controls" Contract

    CERN Document Server

    Ninin, P

    2000-01-01

    ST division is currently specifying a 'Software Support for Industrial Controls' contract. The application of this contract and its success will require several changes in our habits for specifying, designing, and maintaining control systems. This paper summarizes some key concepts which should be respected in order to obtain maximum benefits from the future contract and to optimize the software activities in the division. The contract concerns the maintenance and development of the monitoring and control systems used for supervising CERN's technical infrastructure (electrical distribution, cooling water, air conditioning, safety, and access control). The systems concerned consist of computer and communication hardware and software, tailored to provide specific functionalities for the remote operation, command, and monitoring of equipment. All these systems use commercially available software and hardware such as SCADA, PLCs and associated drivers, controllers, fieldbuses, and networks. It is intended to cont...

  5. Effects of accuracy constraints on reach-to-grasp movements in cerebellar patients.

    Science.gov (United States)

    Rand, M K; Shimansky, Y; Stelmach, G E; Bracha, V; Bloedel, J R

    2000-11-01

    Reach-to-grasp movements of patients with pathology restricted to the cerebellum were compared with those of normal controls. Two types of paradigms with different accuracy constraints were used to examine whether cerebellar impairment disrupts the stereotypic relationship between arm transport and grip aperture and whether the variability of this relationship is altered when greater accuracy is required. The movements were made to either a vertical dowel or to a cross bar of a small cross. All subjects were asked to reach for either target at a fast but comfortable speed, grasp the object between the index finger and thumb, and lift it a short distance off the table. In terms of the relationship between arm transport and grip aperture, the control subjects showed a high consistency in grip aperture and wrist velocity profiles from trial to trial for movements to both the dowel and the cross. The relationship between the maximum velocity of the wrist and the time at which grip aperture was maximal during the reach was highly consistent throughout the experiment. In contrast, the time of maximum grip aperture and maximum wrist velocity of the cerebellar patients was quite variable from trial to trial, and the relationship of these measurements also varied considerably. These abnormalities were present regardless of the accuracy requirement. In addition, the cerebellar patients required a significantly longer time to grasp and lift the objects than the control subjects. Furthermore, the patients exhibited a greater grip aperture during reach than the controls. These data indicate that the cerebellum contributes substantially to the coordination of movements required to perform reach-to-grasp movements. Specifically, the cerebellum is critical for executing this behavior with a consistent, well-timed relationship between the transport and grasp components. This contribution is apparent even when accuracy demands are minimal.

  6. Interference of Different Types of Seats on Postural Control System during a Forward-Reaching Task in Individuals with Paraplegia

    Science.gov (United States)

    de Abreu, Daniela Cristina Carvalho; Takara, Kelly; Metring, Nathalia Lopes; Reis, Julia Guimaraes; Cliquet, Alberto, Jr.

    2012-01-01

    We aimed to evaluate the influence of different types of wheelchair seats on paraplegic individuals' postural control using a maximum anterior reaching test. Balance evaluations during 50, 75, and 90% of each individual's maximum reach in the forward direction using two different cushions on seat (one foam and one gel) and a no-cushion condition…

  7. Skeletal muscle collagen content in humans after high-force eccentric contractions

    DEFF Research Database (Denmark)

    Mackey, Abigail; Donnelly, Alan E; Turpeenniemi-Hujanen, Taina

    2004-01-01

    The purpose of this study was to investigate the effects of high-force eccentric muscle contractions on collagen remodeling and on circulating levels of matrix metalloproteinases (MMP) and tissue inhibitors of metalloproteinases (TIMP) in humans. Nine volunteers [5 men and 4 women, mean age 23 (SD...... 4) yr] each performed a bout of 100 maximum voluntary eccentric contractions of the knee extensors. Muscle biopsies were taken before exercise and on days 4 and 22 afterward. Image analysis of stained tissue sections was used to quantify endomysial collagen staining intensity. Maximum voluntary...... contractile force declined by 39 +/- 23% (mean +/- SD) on day 2 postexercise and recovered thereafter. Serum creatine kinase activity peaked on day 4 postexercise (P Collagen type IV staining intensity increased significantly on day 22 postexercise to 126 +/- 29% (mean +/- SD) of preexercise values...

  8. Maximum Range of a Projectile Thrown from Constant-Speed Circular Motion

    Science.gov (United States)

    Poljak, Nikola

    2016-01-01

    The problem of determining the angle ? at which a point mass launched from ground level with a given speed v[subscript 0] will reach a maximum distance is a standard exercise in mechanics. There are many possible ways of solving this problem, leading to the well-known answer of ? = p/4, producing a maximum range of D[subscript max] = v[superscript…

  9. Strategic urban projects in Amsterdam and New York : Incomplete contracts and good faith in different legal systems

    NARCIS (Netherlands)

    Van der Veen, M.; Korthals Altes, W.K.

    2009-01-01

    Contracts between local government and private investment agencies play an important role in strategic urban projects. Real estate cycles provide only a narrow window of opportunity within which to draft such contracts. A legal system should therefore not impede the possibility of reaching an

  10. Electromyography Exposes Heterogeneity in Muscle Co-Contraction following Stroke

    Directory of Open Access Journals (Sweden)

    Caitlin L. Banks

    2017-12-01

    Full Text Available Walking after stroke is often described as requiring excessive muscle co-contraction, yet, evidence that co-contraction is a ubiquitous motor control strategy for this population remains inconclusive. Co-contraction, the simultaneous activation of agonist and antagonist muscles, can be assessed with electromyography (EMG but is often described qualitatively. Here, our goal is to determine if co-contraction is associated with gait impairments following stroke. Fifteen individuals with chronic stroke and nine healthy controls walked on an instrumented treadmill at self-selected speed. Surface EMGs were collected from the medial gastrocnemius (MG, soleus (SOL, and tibialis anterior (TA of each leg. EMG envelope amplitudes were assessed in three ways: (1 no normalization, (2 normalization to the maximum value across the gait cycle, or (3 normalization to maximal M-wave. Three co-contraction indices were calculated across each agonist/antagonist muscle pair (MG/TA and SOL/TA to assess the effect of using various metrics to quantify co-contraction. Two factor ANOVAs were used to compare effects of group and normalization for each metric. Co-contraction during the terminal stance (TSt phase of gait is not different between healthy controls and the paretic leg of individuals post-stroke, regardless of the metric used to quantify co-contraction. Interestingly, co-contraction was similar between M-max and non-normalized EMG; however, normalization does not impact the ability to resolve group differences. While a modest correlation is revealed between the amount of TSt co-contraction and walking speed, the relationship is not sufficiently strong to motivate further exploration of a causal link between co-contraction and walking function after stroke. Co-contraction does not appear to be a common strategy employed by individuals after stroke. We recommend exploration of alternative EMG analysis approaches in an effort to learn more about the causal

  11. Age-related differences in muscle fatigue vary by contraction type: a meta-analysis.

    Science.gov (United States)

    Avin, Keith G; Law, Laura A Frey

    2011-08-01

    During senescence, despite the loss of strength (force-generating capability) associated with sarcopenia, muscle endurance may improve for isometric contractions. The purpose of this study was to perform a systematic meta-analysis of young versus older adults, considering likely moderators (ie, contraction type, joint, sex, activity level, and task intensity). A 2-stage systematic review identified potential studies from PubMed, CINAHL, PEDro, EBSCOhost: ERIC, EBSCOhost: Sportdiscus, and The Cochrane Library. Studies reporting fatigue tasks (voluntary activation) performed at a relative intensity in both young (18-45 years of age) and old (≥ 55 years of age) adults who were healthy were considered. Sample size, mean and variance outcome data (ie, fatigue index or endurance time), joint, contraction type, task intensity (percentage of maximum), sex, and activity levels were extracted. Effect sizes were (1) computed for all data points; (2) subgrouped by contraction type, sex, joint or muscle group, intensity, or activity level; and (3) further subgrouped between contraction type and the remaining moderators. Out of 3,457 potential studies, 46 publications (with 78 distinct effect size data points) met all inclusion criteria. A lack of available data limited subgroup analyses (ie, sex, intensity, joint), as did a disproportionate spread of data (most intensities ≥ 50% of maximum voluntary contraction). Overall, older adults were able to sustain relative-intensity tasks significantly longer or with less force decay than younger adults (effect size=0.49). However, this age-related difference was present only for sustained and intermittent isometric contractions, whereas this age-related advantage was lost for dynamic tasks. When controlling for contraction type, the additional modifiers played minor roles. Identifying muscle endurance capabilities in the older adult may provide an avenue to improve functional capabilities, despite a clearly established decrement in

  12. Gamma-ray spectra deconvolution by maximum-entropy methods

    International Nuclear Information System (INIS)

    Los Arcos, J.M.

    1996-01-01

    A maximum-entropy method which includes the response of detectors and the statistical fluctuations of spectra is described and applied to the deconvolution of γ-ray spectra. Resolution enhancement of 25% can be reached for experimental peaks and up to 50% for simulated ones, while the intensities are conserved within 1-2%. (orig.)

  13. New transport and handling contract

    CERN Multimedia

    SC Department

    2008-01-01

    A new transport and handling contract entered into force on 1.10.2008. As with the previous contract, the user interface is the internal transport/handling request form on EDH: https://edh.cern.ch/Document/TransportRequest/ To ensure that you receive the best possible service, we invite you to complete the various fields as accurately as possible and to include a mobile telephone number on which we can reach you. You can follow the progress of your request (schedule, completion) in the EDH request routing information. We remind you that the following deadlines apply: 48 hours for the transport of heavy goods (up to 8 tonnes) or simple handling operations 5 working days for crane operations, transport of extra-heavy goods, complex handling operations and combined transport and handling operations in the tunnel. For all enquiries, the number to contact remains unchanged: 72202. Heavy Handling Section TS-HE-HH 72672 - 160319

  14. Custom, contract, and kidney exchange.

    Science.gov (United States)

    Healy, Kieran; Krawiec, Kimberly D

    2012-01-01

    In this Essay, we examine a case in which the organizational and logistical demands of a novel form of organ exchange (the nonsimultaneous, extended, altruistic donor (NEAD) chain) do not map cleanly onto standard cultural schemas for either market or gift exchange, resulting in sociological ambiguity and legal uncertainty. In some ways, a NEAD chain resembles a form of generalized exchange, an ancient and widespread instance of the norm of reciprocity that can be thought of simply as the obligation to “pay it forward” rather than the obligation to reciprocate directly with the original giver. At the same time, a NEAD chain resembles a string of promises and commitments to deliver something in exchange for some valuable consideration--that is, a series of contracts. Neither of these salient "social imaginaries" of exchange--gift giving or formal contract--perfectly meets the practical demands of the NEAD system. As a result, neither contract nor generalized exchange drives the practice of NEAD chains. Rather, the majority of actual exchanges still resemble a simpler form of exchange: direct, simultaneous exchange between parties with no time delay or opportunity to back out. If NEAD chains are to reach their full promise for large-scale, nonsimultaneous organ transfer, legal uncertainties and sociological ambiguities must be finessed, both in the practices of the coordinating agencies and in the minds of NEAD-chain participants. This might happen either through the further elaboration of gift-like language and practices, or through a creative use of the cultural form and motivational vocabulary, but not necessarily the legal and institutional machinery, of contract.

  15. Changed circumstances and the renegotiation of foreign investment contracts

    Directory of Open Access Journals (Sweden)

    Dubajić Dušan

    2017-01-01

    Full Text Available Today's world is shaped by the processes of globalization and economic liberalization, which dominantly determine the social, economic, environmental and political conditions. As part of these processes, there is an increasing rhetoric about the activities of the state to build a legal system 'ideal for attracting' foreign investment, to establish state institutions in charge of 'attracting foreign investment', and to create a business environment conducive to 'attract' foreign investment. Faced with citizen requests and pressure to create conditions for employment, in initial negotiations with foreign investors state, authorities articulate their willingness to meet these requests. The affirmative stance of governments towards the investments of multinational companies easily can be changed. Once the investment begins, the pledges made by one contracting party to the other may prove to be unrealistic and economically unjustified. The tensions generated between the host state and foreign investors jeopardize the foreign investment contract concluded by the contracting parties. Further fulfillment of contractual obligations from foreign investment contracts will be possible if the contracting parties resolve the resulting conflict through mutual negotiations. Through negotiations, the contracting parties can depreciate the impact of the changed circumstances, including a range of economic, political, legislative and environmental conditions. Initiating negotiations at the right time and conducting them in good faith may lead to a solution. Even if an agreement is not reached, the renegotiation may contribute to a better understanding of contractual partners and redefining the positions of the contracting parties.

  16. Contraction-associated translocation of protein kinase C in rat skeletal muscle

    DEFF Research Database (Denmark)

    Richter, Erik; Cleland, P J; Rattigan, S

    1987-01-01

    Electrical stimulation of the sciatic nerve of the anaesthetized rat in vivo led to a time-dependent translocation of protein kinase C from the muscle cytosol to the particulate fraction. Maximum activity of protein kinase C in the particulate fraction occurred after 2 min of intermittent short...... tetanic contractions of the gastrocnemius-plantaris-soleus muscle group and coincided with the loss of activity from the cytosol. Translocation of protein kinase C may imply a role for this kinase in contraction-initiated changes in muscle metabolism....

  17. Exploring high-density baryonic matter: Maximum freeze-out density

    Energy Technology Data Exchange (ETDEWEB)

    Randrup, Joergen [Lawrence Berkeley National Laboratory, Nuclear Science Division, Berkeley, CA (United States); Cleymans, Jean [University of Cape Town, UCT-CERN Research Centre and Department of Physics, Rondebosch (South Africa)

    2016-08-15

    The hadronic freeze-out line is calculated in terms of the net baryon density and the energy density instead of the usual T and μ{sub B}. This analysis makes it apparent that the freeze-out density exhibits a maximum as the collision energy is varied. This maximum freeze-out density has μ{sub B} = 400 - 500 MeV, which is above the critical value, and it is reached for a fixed-target bombarding energy of 20-30 GeV/N well within the parameters of the proposed NICA collider facility. (orig.)

  18. The Comparison of Psychological Contract Perception of Physicians and Nurses

    Directory of Open Access Journals (Sweden)

    Necmettin Cihangiroglu

    2012-02-01

    Full Text Available OBJECTIVE: In this study, it was aimed to find out if psychological contract perception of physicians and nurses is different or not. METHODS: The study has been cross sectionaly contucted from May to June 2010, in a 1200 bed education and research hospital in Ankara. We aimed at reaching all of the physicians and nurses without any sampling. A questionnaire method was used for data collection. Out of 646 surveys given out, we collected 413. To measure psychological contract perception of workers, Psychological Contract Scale with the 17 items developed by Millward and Hopkins. RESULTS: The reliability analysis of the Scale showed that Cronbach Alpha coefficient for the transactional contract dimension is 0,66, and for the relational contract dimension is 0,71. Whereas the univarite analysis showed that differences between transactional contract perception of physicians and nurses were significant multivarite variance analysis showed that differences between transactional (F=1.38, p=0.241 and relational (F=3.01, p=0.084 contract perception of physicians and nurses were not significant, and their perception related to both dimensions were affected only by their educational level (p<0.05. CONSLUSION: We hope that the results of this study provides significant information for healthcare organisation managers. But a more detailed study is needed to claim that these results are marginal. [TAF Prev Med Bull 2012; 11(1.000: 63-70

  19. Iteration particle swarm optimization for contract capacities selection of time-of-use rates industrial customers

    International Nuclear Information System (INIS)

    Lee, Tsung-Ying; Chen, Chun-Lung

    2007-01-01

    This paper presents a new algorithm for solving the optimal contract capacities of a time-of-use (TOU) rates industrial customer. This algorithm is named iteration particle swarm optimization (IPSO). A new index, called iteration best is incorporated into particle swarm optimization (PSO) to improve solution quality and computation efficiency. Expanding line construction cost and contract recovery cost are considered, as well as demand contract capacity cost and penalty bill, in the selection of the optimal contract capacities. The resulting optimal contract capacity effectively reaches the minimum electricity charge of TOU rates users. A significant reduction in electricity costs is observed. The effects of expanding line construction cost and contract recovery cost on the selection of optimal contract capacities can also be estimated. The feasibility of the new algorithm is demonstrated by a numerical example, and the IPSO solution quality and computation efficiency are compared to those of other algorithms

  20. Extreme Maximum Land Surface Temperatures.

    Science.gov (United States)

    Garratt, J. R.

    1992-09-01

    There are numerous reports in the literature of observations of land surface temperatures. Some of these, almost all made in situ, reveal maximum values in the 50°-70°C range, with a few, made in desert regions, near 80°C. Consideration of a simplified form of the surface energy balance equation, utilizing likely upper values of absorbed shortwave flux (1000 W m2) and screen air temperature (55°C), that surface temperatures in the vicinity of 90°-100°C may occur for dry, darkish soils of low thermal conductivity (0.1-0.2 W m1 K1). Numerical simulations confirm this and suggest that temperature gradients in the first few centimeters of soil may reach 0.5°-1°C mm1 under these extreme conditions. The study bears upon the intrinsic interest of identifying extreme maximum temperatures and yields interesting information regarding the comfort zone of animals (including man).

  1. How long do centenarians survive? Life expectancy and maximum lifespan.

    Science.gov (United States)

    Modig, K; Andersson, T; Vaupel, J; Rau, R; Ahlbom, A

    2017-08-01

    The purpose of this study was to explore the pattern of mortality above the age of 100 years. In particular, we aimed to examine whether Scandinavian data support the theory that mortality reaches a plateau at particularly old ages. Whether the maximum length of life increases with time was also investigated. The analyses were based on individual level data on all Swedish and Danish centenarians born from 1870 to 1901; in total 3006 men and 10 963 women were included. Birth cohort-specific probabilities of dying were calculated. Exact ages were used for calculations of maximum length of life. Whether maximum age changed over time was analysed taking into account increases in cohort size. The results confirm that there has not been any improvement in mortality amongst centenarians in the past 30 years and that the current rise in life expectancy is driven by reductions in mortality below the age of 100 years. The death risks seem to reach a plateau of around 50% at the age 103 years for men and 107 years for women. Despite the rising life expectancy, the maximum age does not appear to increase, in particular after accounting for the increasing number of individuals of advanced age. Mortality amongst centenarians is not changing despite improvements at younger ages. An extension of the maximum lifespan and a sizeable extension of life expectancy both require reductions in mortality above the age of 100 years. © 2017 The Association for the Publication of the Journal of Internal Medicine.

  2. The Economics of Smallholder Organic Contract Farming in Tropical Africa

    DEFF Research Database (Denmark)

    Bolwig, Simon; Gibbon, Peter; Jones, Edward Samuel

    2009-01-01

    The paper examines the revenue effects of certified organic contract farming for smallholders and of adoption of organic agricultural farming methods in a tropical African context. The comparison in both cases is with farming systems that are "organic by default." Survey data from a large organic...... coffee contract farming scheme in Uganda are reported and analyzed using a standard OLS regression and a full information maximum likelihood (FIML) estimate of the Heckman selection model. The analysis finds that, controlling for a range of factors, there are positive revenue effects both from...... participation in the scheme and, more modestly, from applying organic farming techniques....

  3. Development of microgravity, full body functional reach envelope using 3-D computer graphic models and virtual reality technology

    Science.gov (United States)

    Lindsey, Patricia F.

    1994-01-01

    In microgravity conditions mobility is greatly enhanced and body stability is difficult to achieve. Because of these difficulties, optimum placement and accessibility of objects and controls can be critical to required tasks on board shuttle flights or on the proposed space station. Anthropometric measurement of the maximum reach of occupants of a microgravity environment provide knowledge about maximum functional placement for tasking situations. Calculations for a full body, functional reach envelope for microgravity environments are imperative. To this end, three dimensional computer modeled human figures, providing a method of anthropometric measurement, were used to locate the data points that define the full body, functional reach envelope. Virtual reality technology was utilized to enable an occupant of the microgravity environment to experience movement within the reach envelope while immersed in a simulated microgravity environment.

  4. Minimal length, Friedmann equations and maximum density

    Energy Technology Data Exchange (ETDEWEB)

    Awad, Adel [Center for Theoretical Physics, British University of Egypt,Sherouk City 11837, P.O. Box 43 (Egypt); Department of Physics, Faculty of Science, Ain Shams University,Cairo, 11566 (Egypt); Ali, Ahmed Farag [Centre for Fundamental Physics, Zewail City of Science and Technology,Sheikh Zayed, 12588, Giza (Egypt); Department of Physics, Faculty of Science, Benha University,Benha, 13518 (Egypt)

    2014-06-16

    Inspired by Jacobson’s thermodynamic approach, Cai et al. have shown the emergence of Friedmann equations from the first law of thermodynamics. We extend Akbar-Cai derivation http://dx.doi.org/10.1103/PhysRevD.75.084003 of Friedmann equations to accommodate a general entropy-area law. Studying the resulted Friedmann equations using a specific entropy-area law, which is motivated by the generalized uncertainty principle (GUP), reveals the existence of a maximum energy density closed to Planck density. Allowing for a general continuous pressure p(ρ,a) leads to bounded curvature invariants and a general nonsingular evolution. In this case, the maximum energy density is reached in a finite time and there is no cosmological evolution beyond this point which leaves the big bang singularity inaccessible from a spacetime prospective. The existence of maximum energy density and a general nonsingular evolution is independent of the equation of state and the spacial curvature k. As an example we study the evolution of the equation of state p=ωρ through its phase-space diagram to show the existence of a maximum energy which is reachable in a finite time.

  5. CSR Standards in Supply Chain Contracts: A Critical Review of the Legal Literature

    DEFF Research Database (Denmark)

    Valkanou, Theodora; Mitkidis, Katerina

    2018-01-01

    with respect to the sensitive topic of social and environmental conditions in international supply chains. This paper presents a critical account of the ways the incorporation of CSR standards in supply chain contracts has been addressed through the lenses of contract law and regulatory doctrine. Legal...... conducted empirical research in order to comprehend the operation of CSR standards in supply chain contracts in practice. The present article documents and critically reviews the different streams of legal scholarship in this area with a view to reaching conclusions on whether (further) exploration by legal......An intensive rise of private regulatory governance within the Corporate Social Responsibility (CSR) arena has preoccupied legal scholars for over a decade now. The role of supply chain contracts as means to regulate CSR issues has gradually gained momentum in legal scholarship, especially...

  6. Banking contracts

    OpenAIRE

    Durčáková, Klára

    2010-01-01

    Resumé - Bank Contracts Bank Contracts are an integral part of our everyday lives. Citizen and bussines entities used bank contracts very often. Despite this fact we can't find legal definition in the Czech law. Banking contracts understand contracts that are signed by banks in their business activities and obligations under these contracts arise. While the banking contracts have been widely used, in Czech law there is not too much literature and judgements abou this issue. Lack of legislatio...

  7. Structural changes during contraction in vertebrate skeletal muscle as studied by time-resolved X-ray diffraction technique

    International Nuclear Information System (INIS)

    Sugi, H.; Tanaka, H.; Kobayashi, T.; Iwamoto, H.; Wakabayashi, K.; Hamanaka, T.; Mitsui, T.; Amemiya, Y.

    1986-01-01

    To obtain information about the structural changes in vertebrate skeletal muscle during contraction, time-resolved X-ray diffraction studies were performed on the intensity changes of the 59 A and 51 A actin layer lines from bullfrog sartorius muscle during the isometric force development, and the intensity changes of the 143 A and 215 A myosin meridional reflections and of the 1,0 and 1,1 equatorial reflections when isometrically contracting muscle was subjected to sinusoidal length changes (1%, 5-10Hz) with the following results. The integrated intensities of the 59 A and 51 A actin layer lines increased during the force development by 30-50% for the 59 A reflection, and by about 70% for the 51 A reflection compard to their respective resting values. These intensity changes were greater than those taking place during the transition from rest to rigor state, and observed to precede the intensity changes of the 429 A myosin off-meridional reflection and of equatorial reflections. When sinusoidal length changes were applied to the muscle generating steady isometric force, the resulting periodic intensity changes in the 1,0 and 1,1 equatorial reflections were in phase and in antiphase with the length changes, respectively. On the other hand, the 143 A myosin reflection exhibited a characteristic periodic change; its intensity reached a maximum at each boundary between the stretch and release phases of the length changes. These results are discussed in connection with the behavior of the cross-bridges during contraction. (author)

  8. On the application of copula in modeling maintenance contract

    International Nuclear Information System (INIS)

    Iskandar, B P; Husniah, H

    2016-01-01

    This paper deals with the application of copula in maintenance contracts for a nonrepayable item. Failures of the item are modeled using a two dimensional approach where age and usage of the item and this requires a bi-variate distribution to modelling failures. When the item fails then corrective maintenance (CM) is minimally repaired. CM can be outsourced to an external agent or done in house. The decision problem for the owner is to find the maximum total profit whilst for the agent is to determine the optimal price of the contract. We obtain the mathematical models of the decision problems for the owner as well as the agent using a Nash game theory formulation. (paper)

  9. Direct electrical stimulation using a battery-operated device for induction and modulation of colonic contractions in pigs.

    Science.gov (United States)

    Bertschi, Mattia; Schlageter, Vincent; Vesin, Jean-Marc; Aellen, Steve; Peloponissios, Nicolas; D'Ambrogio, Aris; Wiesel, Paul Herman; Givel, Jean-Claude; Kucera, Pavel; Virag, Nathalie

    2010-07-01

    Direct electrical stimulation of the colon offers a promising approach for the induction of propulsive colonic contractions by using an implantable device. The objective of this study was to assess the feasibility to induce colonic contractions using a commercially available battery-operated stimulator (maximum pulse width of 1 ms and maximum amplitude of 10 V). Three pairs of pacing electrodes were inserted into the cecal seromuscular layer of anesthetized pigs. During a first set of in vivo experiments conducted on six animals, a pacing protocol leading to cecum contractions was determined: stimulation bursts with 1 ms pulse width, 10 V amplitude (7-15 mA), 120 Hz frequency, and 30-s burst duration, repeated every 2-5 min. In a second testing phase, an evaluation of the pacing protocol was performed in four animals (120 stimulation bursts in total). By using the battery-operated stimulator, contractions of the cecum and movement of contents could be induced in 92% of all stimulations. A cecal shortening of about 30% and an average intraluminal pressure increase of 10.0 +/- 6.0 mmHg were observed.

  10. A conductance maximum observed in an inward-rectifier potassium channel

    OpenAIRE

    1994-01-01

    One prediction of a multi-ion pore is that its conductance should reach a maximum and then begin to decrease as the concentration of permeant ion is raised equally on both sides of the membrane. A conductance maximum has been observed at the single-channel level in gramicidin and in a Ca(2+)-activated K+ channel at extremely high ion concentration (> 1,000 mM) (Hladky, S. B., and D. A. Haydon. 1972. Biochimica et Biophysica Acta. 274:294-312; Eisenmam, G., J. Sandblom, and E. Neher. 1977. In ...

  11. Fractal feature of sEMG from Flexor digitorum superficialis muscle correlated with levels of contraction during low-level finger flexions.

    Science.gov (United States)

    Arjunan, Sridhar P; Kumar, Dinesh K; Naik, Ganesh R

    2010-01-01

    This research paper reports an experimental study on identification of the changes in fractal properties of surface Electromyogram (sEMG) with the changes in the force levels during low-level finger flexions. In the previous study, the authors have identified a novel fractal feature, Maximum fractal length (MFL) as a measure of strength of low-level contractions and has used this feature to identify various wrist and finger movements. This study has tested the relationship between the MFL and force of contraction. The results suggest that changes in MFL is correlated with the changes in contraction levels (20%, 50% and 80% maximum voluntary contraction (MVC)) during low-level muscle activation such as finger flexions. From the statistical analysis and by visualisation using box-plot, it is observed that MFL (p ≈ 0.001) is a more correlated to force of contraction compared to RMS (p≈0.05), even when the muscle contraction is less than 50% MVC during low-level finger flexions. This work has established that this fractal feature will be useful in providing information about changes in levels of force during low-level finger movements for prosthetic control or human computer interface.

  12. 23 CFR 635.121 - Contract time and contract time extensions.

    Science.gov (United States)

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  13. Screening of cardiomyocyte fluorescence during cell contraction by multi-dimensional TCSPC

    Science.gov (United States)

    Chorvat, D., Jr.; Abdulla, S.; Elzwiei, F.; Mateasik, A.; Chorvatova, A.

    2008-02-01

    Autofluorescence is one of the most versatile non-invasive tools for mapping the metabolic state of living tissues, such as the heart. We present a new approach to the investigation of changes in endogenous fluorescence during cardiomyocyte contraction - by spectrally-resolved, time correlated, single photon counting (TCSPC). Cell contraction is stimulated by external platinum electrodes, incorporated in a home-made bath and triggered by a pulse generator at a frequency of 0.5 Hz (to stabilize sarcoplasmic reticulum loading), or 5 Hz (the rat heart rate). Cell illumination by the laser is synchronized with cell contraction, using TTL logic pulses operated by a stimulator and delayed to study mitochondrial metabolism at maximum contraction (10-110 ms) and/or at steady state (1000-1100 ms at 0.5 Hz). To test the setup, we recorded calcium transients in cells loaded with the Fluo-3 fluorescent probe (excited by 475 nm pulsed picosecond diode laser). We then evaluated recordings of flavin AF (excited by 438 nm pulsed laser) at room and physiological temperatures. Application of the presented approach will shed new insight into metabolic changes in living, contracting myocytes and, therefore, regulation of excitation-contraction coupling and/or ionic homeostasis and, thus, heart excitability.

  14. Effect of age and gender on the surface electromyogram during various levels of isometric contraction.

    Science.gov (United States)

    Arjunan, Sridhar; Kumar, Dinesh; Kalra, Chandan; Burne, John; Bastos, Teodiano

    2011-01-01

    This study reports the effects of age and gender on the surface electromyogram while performing isometric contraction. Experiments were conducted with two age groups--Young (Age: 20-29) and Old (Age: 60-69) where they performed sustained isometric contractions at various force levels (50%, 75%, 100% of maximum voluntary contraction). Traditional features such as root mean square (RMS) and median frequency (MDF) were computed from the recorded sEMG. The result indicates that the MDF of sEMG was not significantly affected by age, but was impacted by gender in both age groups. Also there was a significant change in the RMS of sEMG with age and gender at all levels of contraction. The results also indicate a large inter-subject variation. This study will provide an understanding of the underlying physiological effects of muscle contraction and muscle fatigue in different cohorts.

  15. Contributions of central command and muscle feedback to sympathetic nerve activity in contracting human skeletal muscle

    Directory of Open Access Journals (Sweden)

    Daniel eBoulton

    2016-05-01

    Full Text Available During voluntary contractions, muscle sympathetic nerve activity (MSNA to contracting muscles increases in proportion to force but the underlying mechanisms are not clear. To shed light on these mechanisms, particularly the influences of central command and muscle afferent feedback, the present study tested the hypothesis that MSNA is greater during voluntary compared with electrically-evoked contractions. Seven male subjects performed a series of 1-minute isometric dorsiflexion contractions (left leg separated by 2-minute rest periods, alternating between voluntary and electrically-evoked contractions at similar forces (5-10 % of maximum. MSNA was recorded continuously (microneurography from the left peroneal nerve and quantified from cardiac-synchronised, negative-going spikes in the neurogram. Compared with pre-contraction values, MSNA increased by 51 ± 34 % (P 0.05. MSNA analysed at 15-s intervals revealed that this effect of voluntary contraction appeared 15-30 s after contraction onset (P < 0.01, remained elevated until the end of contraction, and disappeared within 15 s after contraction. These findings suggest that central command, and not feedback from contracting muscle, is the primary mechanism responsible for the increase in MSNA to contracting muscle. The time-course of MSNA suggests that there is a longer delay in the onset of this effect compared with its cessation after contraction.

  16. Grounds for dispensing with public tender procedures in Government Contracting

    Directory of Open Access Journals (Sweden)

    P Bolton

    2006-01-01

    Full Text Available The Constitution of the Republic of South Africa1 provides that organs of state must comply with five principles when procuring goods or services: procurement procedures must be fair, equitable, transparent, competitive and cost-effective. In short, this means that organs of state should make use of competition when procuring goods or services. They should shop around and attract the maximum number of contractors who will participate in such competition. The aim should be the attainment of value for money, meaning, public money should be spent in an effective and efficient manner. Those who participate in competitions should also be treated fairly and without bias. In principle, no preferences should be afforded to different contractors; all contracting parties should have equal access to competition; some contractors should not be afforded more time for the preparation and submission of quotes or tenders than others; and the same information should be made available to all contracting parties. Government procurement procedures should further be transparent, meaning public or open. Thus, organs of state should not contract behind closed doors – government contracts should, as a rule, be advertised. Depending on the nature and value of a particular contract, the use of a public call for tenders is generally the best way to ensure compliance with the principles in the Constitution. By nature, a pubic call for tenders is open, it assists in the prevention of fraud and favouritism, and it ensures that the maximum number of contractors is approached to compete for a contract.Organs of state can also compare prices and quality and can contract with whoever offers the best deal. Most legislation therefore proceeds on the basis that procurement takes place by way of tendering. Generally, contracts above R200 000 are subject to public tender procedures. In certain instances, however, a public call for tenders may be inappropriate regardless of the high

  17. Proposal for the award of three contracts for the provision of temporary labour on the CERN site

    CERN Document Server

    2006-01-01

    This document concerns the award of three contracts for the provision of temporary labour on the CERN site. The Finance Committee is invited to agree to the negotiation of three contracts for the provision of temporary labour on the CERN site with CREYF'S (CH), VEDIOR (CH), and ALPEMPLOI (CH) for a total combined maximum amount for three years for all three contracts of 12 000 000 Swiss francs, not subject to revision, for an initial period of three years from 1 July 2006. The contracts will include options for two further one-year extensions beyond the initial three-year period. 2006/62/5/e

  18. Contract market power and its impact on the efficiency of the electricity sector

    International Nuclear Information System (INIS)

    Serra, Pablo

    2013-01-01

    This paper analyzes the pro-competitive effects of financial long-term contracts in oligopolistic electricity markets. This is done in a model that incorporates the main features of the industry: non-storable production, time-varying price-elastic demand, and sequential investment and production decisions. The paper considers contracts for difference that have as reference price the average spot price. Assuming that the spot market coordinator sets competitive prices, the paper shows that installed capacity increases with the quantity of energy contracted, reaching the welfare-maximizing capacity when energy contracted equals this same level. Next, the paper studies the case where the quantity of energy contracted is endogenous and contracts are traded before capacity decisions are taken. Regarding purchasers of contracts, two polar cases are considered: either they are price-taker speculators or they are an aggregation of consumers that auctions a long (buy) contract for a given energy quantity. In the former case the strike price equals the reference price, i.e., arbitrage is perfect, and the quantity of energy contracted falls short of the efficient level. In turn, in the latter case, the strike price equals the average efficient spot price. Moreover, an aggregation of all consumers would choose to auction the social optimum quantity. - Highlights: • The paper analyzes the pro-competitive impact of contracts for difference. • The reference price of contracts is the average spot price. • Installed capacity increases with total quantity of energy contracted. • Social welfare is maximized when energy contracted equals the efficient capacity. • An aggregation of all consumers would choose to auction the efficient quantity

  19. Decoding natural reach-and-grasp actions from human EEG

    Science.gov (United States)

    Schwarz, Andreas; Ofner, Patrick; Pereira, Joana; Ioana Sburlea, Andreea; Müller-Putz, Gernot R.

    2018-02-01

    Objective. Despite the high number of degrees of freedom of the human hand, most actions of daily life can be executed incorporating only palmar, pincer and lateral grasp. In this study we attempt to discriminate these three different executed reach-and-grasp actions utilizing their EEG neural correlates. Approach. In a cue-guided experiment, 15 healthy individuals were asked to perform these actions using daily life objects. We recorded 72 trials for each reach-and-grasp condition and from a no-movement condition. Main results. Using low-frequency time domain features from 0.3 to 3 Hz, we achieved binary classification accuracies of 72.4%, STD  ±  5.8% between grasp types, for grasps versus no-movement condition peak performances of 93.5%, STD  ±  4.6% could be reached. In an offline multiclass classification scenario which incorporated not only all reach-and-grasp actions but also the no-movement condition, the highest performance could be reached using a window of 1000 ms for feature extraction. Classification performance peaked at 65.9%, STD  ±  8.1%. Underlying neural correlates of the reach-and-grasp actions, investigated over the primary motor cortex, showed significant differences starting from approximately 800 ms to 1200 ms after the movement onset which is also the same time frame where classification performance reached its maximum. Significance. We could show that it is possible to discriminate three executed reach-and-grasp actions prominent in people’s everyday use from non-invasive EEG. Underlying neural correlates showed significant differences between all tested conditions. These findings will eventually contribute to our attempt of controlling a neuroprosthesis in a natural and intuitive way, which could ultimately benefit motor impaired end users in their daily life actions.

  20. Small team, big reach : Leduc's AMR process translates cutting-edge engineering skills into worldwide contracts

    International Nuclear Information System (INIS)

    Gullage, R.

    2009-01-01

    AMR Process specializes in oil and gas process engineering. The small company which is headquartered in Leduc, Alberta provides oil and gas packages, proprietary licensed designs and process engineering services in Brazil, China, Iraq and more than a dozen other countries. AMR's expertise includes troubleshooting, de-bottlenecking and process train upgrading. They help clients avoid complicated, costly changes to a project by targeting potential problems at a project's inception. The president and founder of AMR credits the company's success in part to the Nisku-Leduc Economic Development Authority (EDA) which brought AMR together with I. Matheson and Company Ltd., a steel manufacturer in New Glasgow, Nova Scotia. Pressure vessels are one of Matheson's primary products. This article described how AMR Process Inc. has worked with Matheson to secure contracts to build equipment used in oil processing, for markets around the world. 1 fig

  1. Determining suitable dimensions for dairy goat feeding places by evaluating body posture and feeding reach.

    Science.gov (United States)

    Keil, Nina M; Pommereau, Marc; Patt, Antonia; Wechsler, Beat; Gygax, Lorenz

    2017-02-01

    Confined goats spend a substantial part of the day feeding. A poorly designed feeding place increases the risk of feeding in nonphysiological body postures, and even injury. Scientifically validated information on suitable dimensions of feeding places for loose-housed goats is almost absent from the literature. The aim of the present study was, therefore, to determine feeding place dimensions that would allow goats to feed in a species-appropriate, relaxed body posture. A total of 27 goats with a height at the withers of 62 to 80 cm were included in the study. Goats were tested individually in an experimental feeding stall that allowed the height difference between the feed table, the standing area of the forelegs, and a feeding area step (difference in height between forelegs and hind legs) to be varied. The goats accessed the feed table via a palisade feeding barrier. The feed table was equipped with recesses at varying distances to the feeding barrier (5-55 cm in 5-cm steps) at angles of 30°, 60°, 90°, 120°, or 150° (feeding angle), which were filled with the goats' preferred food. In 18 trials, balanced for order across animals, each animal underwent all possible combinations of feeding area step (3 levels: 0, 10, and 20 cm) and of difference in height between feed table and standing area of forelegs (6 levels: 0, 5, 10, 15, 20, and 25 cm). The minimum and maximum reach at which the animals could reach feed on the table with a relaxed body posture was determined for each combination. Statistical analysis was performed using mixed-effects models. The animals were able to feed with a relaxed posture when the feed table was at least 10 cm higher than the standing height of the goats' forelegs. Larger goats achieved smaller minimum reaches and minimum reach increased if the goats' head and neck were angled. Maximum reach increased with increasing height at withers and height of the feed table. The presence of a feeding area step had no influence on minimum and

  2. Standard form contracts and a smart contract future

    Directory of Open Access Journals (Sweden)

    Kristin B. Cornelius

    2018-05-01

    Full Text Available With a budding market of widespread smart contract implementation on the horizon, there is much conversation about how to regulate this new technology. Discourse on standard form contracts (SFCs and how they have been adopted in a digital environment is useful toward predicting how smart contracts might be interpreted. This essay provides a critical review of the discourse surrounding digitised SFCs and applies it to issues in smart contract regulation. An exploration of the literature surrounding specific instances SFCs finds that it lacks a close examination of the textual and documentary aspects of SFCs, which are particularly important in a digital environment as a shift in medium prompts a different procedural process. Instead, common perspectives are either based on outdated notions of paper versions of these contracts or on ideologies of industry and business that do not sufficiently address the needs of consumers/users in the digital age. Most importantly, noting the failure of contract law to address the inequities of SFCs in this environment can help prevent them from being codified further with smart contracts.

  3. Maximum Power Point Tracking in Variable Speed Wind Turbine Based on Permanent Magnet Synchronous Generator Using Maximum Torque Sliding Mode Control Strategy

    Institute of Scientific and Technical Information of China (English)

    Esmaeil Ghaderi; Hossein Tohidi; Behnam Khosrozadeh

    2017-01-01

    The present study was carried out in order to track the maximum power point in a variable speed turbine by minimizing electromechanical torque changes using a sliding mode control strategy.In this strategy,fhst,the rotor speed is set at an optimal point for different wind speeds.As a result of which,the tip speed ratio reaches an optimal point,mechanical power coefficient is maximized,and wind turbine produces its maximum power and mechanical torque.Then,the maximum mechanical torque is tracked using electromechanical torque.In this technique,tracking error integral of maximum mechanical torque,the error,and the derivative of error are used as state variables.During changes in wind speed,sliding mode control is designed to absorb the maximum energy from the wind and minimize the response time of maximum power point tracking (MPPT).In this method,the actual control input signal is formed from a second order integral operation of the original sliding mode control input signal.The result of the second order integral in this model includes control signal integrity,full chattering attenuation,and prevention from large fluctuations in the power generator output.The simulation results,calculated by using MATLAB/m-file software,have shown the effectiveness of the proposed control strategy for wind energy systems based on the permanent magnet synchronous generator (PMSG).

  4. Black hole formation in a contracting universe

    Energy Technology Data Exchange (ETDEWEB)

    Quintin, Jerome; Brandenberger, Robert H., E-mail: jquintin@physics.mcgill.ca, E-mail: rhb@hep.physics.mcgill.ca [Department of Physics, McGill University, 3600 rue University, Montréal, QC, H3A 2T8 Canada (Canada)

    2016-11-01

    We study the evolution of cosmological perturbations in a contracting universe. We aim to determine under which conditions density perturbations grow to form large inhomogeneities and collapse into black holes. Our method consists in solving the cosmological perturbation equations in complete generality for a hydrodynamical fluid. We then describe the evolution of the fluctuations over the different length scales of interest and as a function of the equation of state for the fluid, and we explore two different types of initial conditions: quantum vacuum and thermal fluctuations. We also derive a general requirement for black hole collapse on sub-Hubble scales, and we use the Press-Schechter formalism to describe the black hole formation probability. For a fluid with a small sound speed (e.g., dust), we find that both quantum and thermal initial fluctuations grow in a contracting universe, and the largest inhomogeneities that first collapse into black holes are of Hubble size and the collapse occurs well before reaching the Planck scale. For a radiation-dominated fluid, we find that no black hole can form before reaching the Planck scale. In the context of matter bounce cosmology, it thus appears that only models in which a radiation-dominated era begins early in the cosmological evolution are robust against the formation of black holes. Yet, the formation of black holes might be an interesting feature for other models. We comment on a number of possible alternative early universe scenarios that could take advantage of this feature.

  5. Black hole formation in a contracting universe

    International Nuclear Information System (INIS)

    Quintin, Jerome; Brandenberger, Robert H.

    2016-01-01

    We study the evolution of cosmological perturbations in a contracting universe. We aim to determine under which conditions density perturbations grow to form large inhomogeneities and collapse into black holes. Our method consists in solving the cosmological perturbation equations in complete generality for a hydrodynamical fluid. We then describe the evolution of the fluctuations over the different length scales of interest and as a function of the equation of state for the fluid, and we explore two different types of initial conditions: quantum vacuum and thermal fluctuations. We also derive a general requirement for black hole collapse on sub-Hubble scales, and we use the Press-Schechter formalism to describe the black hole formation probability. For a fluid with a small sound speed (e.g., dust), we find that both quantum and thermal initial fluctuations grow in a contracting universe, and the largest inhomogeneities that first collapse into black holes are of Hubble size and the collapse occurs well before reaching the Planck scale. For a radiation-dominated fluid, we find that no black hole can form before reaching the Planck scale. In the context of matter bounce cosmology, it thus appears that only models in which a radiation-dominated era begins early in the cosmological evolution are robust against the formation of black holes. Yet, the formation of black holes might be an interesting feature for other models. We comment on a number of possible alternative early universe scenarios that could take advantage of this feature.

  6. Seeking the epoch of maximum luminosity for dusty quasars

    International Nuclear Information System (INIS)

    Vardanyan, Valeri; Weedman, Daniel; Sargsyan, Lusine

    2014-01-01

    Infrared luminosities νL ν (7.8 μm) arising from dust reradiation are determined for Sloan Digital Sky Survey (SDSS) quasars with 1.4 maximum at any redshift z < 5, reaching a plateau for z ≳ 3 with maximum luminosity νL ν (7.8 μm) ≳ 10 47 erg s –1 ; luminosity functions show one quasar Gpc –3 having νL ν (7.8 μm) > 10 46.6 erg s –1 for all 2 reached their maximum luminosity has not yet been identified at any redshift below 5. The most ultraviolet luminous quasars, defined by rest frame νL ν (0.25 μm), have the largest values of the ratio νL ν (0.25 μm)/νL ν (7.8 μm) with a maximum ratio at z = 2.9. From these results, we conclude that the quasars most luminous in the ultraviolet have the smallest dust content and appear luminous primarily because of lessened extinction. Observed ultraviolet/infrared luminosity ratios are used to define 'obscured' quasars as those having >5 mag of ultraviolet extinction. We present a new summary of obscured quasars discovered with the Spitzer Infrared Spectrograph and determine the infrared luminosity function of these obscured quasars at z ∼ 2.1. This is compared with infrared luminosity functions of optically discovered, unobscured quasars in the SDSS and in the AGN and Galaxy Evolution Survey. The comparison indicates comparable numbers of obscured and unobscured quasars at z ∼ 2.1 with a possible excess of obscured quasars at fainter luminosities.

  7. Retendering of ST-CV maintenance contract

    CERN Document Server

    Battistin, M

    2003-01-01

    During the next three years, the ST/CV group will be deeply involved in the installation works for the LHC project. During this period the need for maintenance activity will decrease. The minimum level will be reached during the “long shutdown” of the PS and SPS machines in 2005. The budget for the maintenance will decrease accordingly, thus the CV group had to review its maintenance strategy. The new contract, which started on January 1st 2003, has been defined to cope with these workload variations during the next years and to guarantee the minimum maintenance activity on the existing equipment. A lump-sum contract based on a win-win strategy has been discarded. The contractor no longer has to guarantee the performance of the CERN cooling and ventilation systems. A new price list strategy based on performance indicators and penalties has been chosen. The contractor now has to guarantee the performance of every maintenance operation demanded by CERN. This modification obliged the Operation section of the...

  8. Point defect weakened thermal contraction in monolayer graphene.

    Science.gov (United States)

    Zha, Xian-Hu; Zhang, Rui-Qin; Lin, Zijing

    2014-08-14

    We investigate the thermal expansion behaviors of monolayer graphene and three configurations of graphene with point defects, namely the replacement of one carbon atom with a boron or nitrogen atom, or of two neighboring carbon atoms by boron-nitrogen atoms, based on calculations using first-principles density functional theory. It is found that the thermal contraction of monolayer graphene is significantly decreased by point defects. Moreover, the corresponding temperature for negative linear thermal expansion coefficient with the maximum absolute value is reduced. The cause is determined to be point defects that enhance the mechanical strength of graphene and then reduce the amplitude and phonon frequency of the out-of-plane acoustic vibration mode. Such defect weakening of graphene thermal contraction will be useful in nanotechnology to diminish the mismatching or strain between the graphene and its substrate.

  9. Modulation of hand aperture during reaching in persons with incomplete cervical spinal cord injury.

    Science.gov (United States)

    Stahl, Victoria A; Hayes, Heather B; Buetefisch, Cathrin M; Wolf, Steven L; Trumbower, Randy D

    2015-03-01

    The intact neuromotor system prepares for object grasp by first opening the hand to an aperture that is scaled according to object size and then closing the hand around the object. After cervical spinal cord injury (SCI), hand function is significantly impaired, but the degree to which object-specific hand aperture scaling is affected remains unknown. Here, we hypothesized that persons with incomplete cervical SCI have a reduced maximum hand opening capacity but exhibit novel neuromuscular coordination strategies that permit object-specific hand aperture scaling during reaching. To test this hypothesis, we measured hand kinematics and surface electromyography from seven muscles of the hand and wrist during attempts at maximum hand opening as well as reaching for four balls of different diameters. Our results showed that persons with SCI exhibited significantly reduced maximum hand aperture compared to able-bodied (AB) controls. However, persons with SCI preserved the ability to scale peak hand aperture with ball size during reaching. Persons with SCI also used distinct muscle coordination patterns that included increased co-activity of flexors and extensors at the wrist and hand compared to AB controls. These results suggest that motor planning for aperture modulation is preserved even though execution is limited by constraints on hand opening capacity and altered muscle co-activity. Thus, persons with incomplete cervical SCI may benefit from rehabilitation aimed at increasing hand opening capacity and reducing flexor-extensor co-activity at the wrist and hand.

  10. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach of the Columbia River, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John; Nugent, Michael; Brock, Wendy (Washington Department of Fish and Wildlife, Olympia, WA)

    2002-05-29

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the fourth year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 2000 field season.

  11. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach of the Columbia River, 1999 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John

    2002-01-24

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the third year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fishes, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1999 field season.

  12. Evaluation of Juvenile Fall Chinook Salmon Stranding on the Hanford Reach in the Columbia River, 1998 Interim Report.

    Energy Technology Data Exchange (ETDEWEB)

    Nugent, John; Newsome, Todd; Nugent, Michael (Washington Department of Fish and Wildlife, Olympia, WA)

    2001-07-27

    The Washington Department of Fish and Wildlife (WDFW) has been contracted through the Bonneville Power Administration (BPA) and the Grant County Public Utility District (GCPUD) to perform an evaluation of juvenile fall chinook salmon (Oncorhynchus tshawytscha) stranding on the Hanford Reach. The evaluation, in the second year of a multi-year study, has been developed to assess the impacts of water fluctuations from Priest Rapids Dam on rearing juvenile fall chinook salmon, other fish species, and benthic macroinvertebrates of the Hanford Reach. This document provides the results of the 1998 field season.

  13. Reaching the hard-to-reach.

    Science.gov (United States)

    Valdes, C

    1992-01-01

    Guatemala's family planning (FP) programs are innovative but contraceptive use is only 23%. Total fertility is 5.3 children/woman, and the 9.5 million population will double in 23 years. The problem is poverty and illiteracy among rural residents removed from health services. 80% live in poverty and 80% are illiterate. Government effort is devoted to combating diseases such as diarrhea so there are few funds for implementing a comprehensive population policy. There is support within the national government but FP lacks priority status. APROFAM's goals are to use innovative marketing methods to inform the rural population who lack access to and knowledge about FP. Service delivery is constrained by the difficulty in reaching remote areas where 4 out of 10 indigenous Guatemalans live. Infant mortality can reach as high as 200/1000 live births. Population growth has slowed, and APROFAM plans to reach 16,000 more in the future. Promotions are conducted in several languages and aired on radio, television, and in the print media. It has been found that market research is the most effective strategy in reaching indigenous families. APROFAM has also been effective in upgrading service facilities through training, client surveys, and setting improved clinic standards. Breastfeeding, training, and voluntary sterilization programs contribute to the primary care effort. The example is given of Paulina Lebron from a very poor area who has learned how to space her children and thus improve the standard of living for her family. Eventually, she convinced herself and her family that sterilization was necessary, and now the couple enjoy the bliss of newlyweds without fear of pregnancy.

  14. Electromechanical delay components during skeletal muscle contraction and relaxation in patients with myotonic dystrophy type 1.

    Science.gov (United States)

    Esposito, Fabio; Cè, Emiliano; Rampichini, Susanna; Limonta, Eloisa; Venturelli, Massimo; Monti, Elena; Bet, Luciano; Fossati, Barbara; Meola, Giovanni

    2016-01-01

    The electromechanical delay during muscle contraction and relaxation can be partitioned into mainly electrochemical and mainly mechanical components by an EMG, mechanomyographic, and force combined approach. Component duration and measurement reliability were investigated during contraction and relaxation in a group of patients with myotonic dystrophy type 1 (DM1, n = 13) and in healthy controls (n = 13). EMG, mechanomyogram, and force were recorded in DM1 and in age- and body-matched controls from tibialis anterior (distal muscle) and vastus lateralis (proximal muscle) muscles during maximum voluntary and electrically-evoked isometric contractions. The electrochemical and mechanical components of the electromechanical delay during muscle contraction and relaxation were calculated off-line. Maximum strength was significantly lower in DM1 than in controls under both experimental conditions. All electrochemical and mechanical components were significantly longer in DM1 in both muscles. Measurement reliability was very high in both DM1 and controls. The high reliability of the measurements and the differences between DM1 patients and controls suggest that the EMG, mechanomyographic, and force combined approach could be utilized as a valid tool to assess the level of neuromuscular dysfunction in this pathology, and to follow the efficacy of pharmacological or non-pharmacological interventions. Copyright © 2015 Elsevier B.V. All rights reserved.

  15. Contract Award Decisions Resulting in Contract Termination for Default

    National Research Council Canada - National Science Library

    1996-01-01

    .... Specifically, the audit focused on contracts terminated either for default or convenience and determined whether the contract terminations could have been averted based on information available before contract award...

  16. The NBA’s Maximum Player Salary and the Distribution of Player Rents

    Directory of Open Access Journals (Sweden)

    Kelly M. Hastings

    2015-03-01

    Full Text Available The NBA’s 1999 Collective Bargaining Agreement (CBA included provisions capping individual player pay in addition to team payrolls. This study examines the effect the NBA’s maximum player salary on player rents by comparing player pay from the 1997–1998 and 2003–2004 seasons while controlling for player productivity and other factors related to player pay. The results indicate a large increase in the pay received by teams’ second highest and, to a lesser extent, third highest paid players. We interpret this result as evidence that the adoption of the maximum player salary shifted rents from stars to complementary players. We also show that the 1999 CBA’s rookie contract provisions reduced salaries of early career players.

  17. THE EFFECT OF THE STATIC RELATIVE STRENGTH ON THE MAXIMUM RELATIVE RECEIVING OF OXYGEN

    Directory of Open Access Journals (Sweden)

    Abdulla Elezi

    2011-09-01

    Full Text Available Based on research on the sample of 263 students of age- 18 years, and used batteries of 9 tests for evaluation of the static relative strength and the criterion variable- maximum relative receiving of oxygen (VO2 ml / kg / min based on the Astrand test ,and on regression analysis to determine the influence of the static relative strength on the criterion variable maximum relative oxygen receiving, can be generally concluded that from 9 predictor variables statistically significant partial effect have 2variables. In hierarchical order, they are: the variable of static relative leg strength - endurance of the fingers (the angle of the lower leg and thigh 900 (SRL2 which arithmetic mean is 25.04 seconds and variable ctatic relative strength of arms and shoulders – push-up endurance in the balance beam (angle of the forearm and upper arm 900 ( SRA2 with arithmetic mean of 17.75 seconds. From the statistically influential significant predictor variables on the criterion variable one is from the static relative leg strength (SRL2 and the other is from the static relative strength of arm and shoulder area (SRA2. With the analysis of these relations we can conclude that the isometric contractions of the four headed thigh muscle and the isometric contractions of the three headed upper arm muscle are predominantly responsible for the successful execution of doing actions on a bicycle ergometer and not on the maximum relative receiving of oxygen.

  18. Plyometric training improves voluntary activation and strength during isometric, concentric and eccentric contractions.

    Science.gov (United States)

    Behrens, Martin; Mau-Moeller, Anett; Mueller, Karoline; Heise, Sandra; Gube, Martin; Beuster, Nico; Herlyn, Philipp K E; Fischer, Dagmar-C; Bruhn, Sven

    2016-02-01

    This study investigated effects of plyometric training (6 weeks, 3 sessions/week) on maximum voluntary contraction (MVC) strength and neural activation of the knee extensors during isometric, concentric and eccentric contractions. Twenty-seven participants were randomly assigned to the intervention or control group. Maximum voluntary torques (MVT) during the different types of contraction were measured at 110° knee flexion (180°=full extension). The interpolated twitch technique was applied at the same knee joint angle during isometric, concentric and eccentric contractions to measure voluntary activation. In addition, normalized root mean square of the EMG signal at MVT was calculated. The twitch torque signal induced by electrical nerve stimulation at rest was used to evaluate training-related changes at the muscle level. In addition, jump height in countermovement jump was measured. After training, MVT increased by 20Nm (95% CI: 5-36Nm, P=0.012), 24Nm (95% CI: 9-40Nm, P=0.004) and 27Nm (95% CI: 7-48Nm, P=0.013) for isometric, concentric and eccentric MVCs compared to controls, respectively. The strength enhancements were associated with increases in voluntary activation during isometric, concentric and eccentric MVCs by 7.8% (95% CI: 1.8-13.9%, P=0.013), 7.0% (95% CI: 0.4-13.5%, P=0.039) and 8.6% (95% CI: 3.0-14.2%, P=0.005), respectively. Changes in the twitch torque signal of the resting muscle, induced by supramaximal electrical stimulation of the femoral nerve, were not observed, indicating no alterations at the muscle level, whereas jump height was increased. Given the fact that the training exercises consisted of eccentric muscle actions followed by concentric contractions, it is in particular relevant that the plyometric training increased MVC strength and neural activation of the quadriceps muscle regardless of the contraction mode. Copyright © 2015 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

  19. Mass loss from the southern half of the Greenland Ice Sheet since the Little Ice Age Maximum

    DEFF Research Database (Denmark)

    Kjeldsen, Kristian Kjellerup; Kjær, Kurt H.; Bjørk, Anders Anker

    Northern hemisphere temperatures reached their Holocene minimum and most glaciers reached their maximum during The Little Ice Age (LIA), but the timing of specific cold intervals is site-specific. In southern Greenland, we have compiled data from organic matter incorporated in LIA sediments, used...... retreat. Our results show that the advance of glaciers during the LIA occurs early after the Medieval Warm Period terminating soon after 1200 AD and culminates c. 1500-1600 AD. Historical maps also show that many glaciers on the western coast occupy a still-stand near the LIA maximum until 1900 AD before...

  20. Ultrasound evaluation of muscle thickness changes in the external oblique, internal oblique, and transversus abdominis muscles considering the influence of posture and muscle contraction.

    Science.gov (United States)

    Sugaya, Tomoaki; Abe, Yota; Sakamoto, Masaaki

    2014-09-01

    [Purpose] The aim of this study was to investigate muscle thickness changes in the external oblique (EO), internal oblique (IO), and transversus abdominis (TrA) muscles between the neutral position and trunk rotation, under a state of rest without voluntary contractions, and isometric contractions to both sides with resistance of 50% of the maximum trunk rotation strength. [Subjects] The subjects of this study were 21 healthy young men. [Methods] Muscle thickness changes in the EO, IO, and TrA in each position and state were evaluated by ultrasound. The range of motion at maximum trunk rotation and the maximum strength of trunk rotation were measured using a hand-held dynamometer. [Results] In the neutral position and at 50% trunk rotation to the right side, the thicknesses of the IO and TrA significantly increased with resistance. In both states, the thicknesses of the IO and TrA significantly increased at 50% trunk rotation to the right side. [Conclusion] The muscular contractions of the IO and TrA were stronger during ipsilateral rotation than in the neutral position and with resistance than at rest. Moreover, the muscular contraction was strongest in the resistive state during ipsilateral rotation.

  1. Polymorphic Contracts

    Science.gov (United States)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  2. Optimal Remanufacturing Certification Contracts in the Electrical and Electronic Industry

    Directory of Open Access Journals (Sweden)

    Huihui Liu

    2017-03-01

    Full Text Available While remanufacturing is highly encouraged worldwide, some original equipment manufacturers (OEMs in the electrical and electronics industry are still not willing to embrace remanufacturing, for fear of expensive investment or the cannibalization of existing products. Meanwhile, third-party remanufacturers’ (TPRs remanufactured products are developing quickly. Due to quality reasons, consumers usually have a higher preference for OEM-certified remanufactured products than uncertified ones. As such, remanufacturing certification has become a strategy that OEMs can use to benefit from product remanufacturing. Our paper focuses on the remanufacturing certification contract between an OEM and a TPR. Once certified, the TPR makes payments to the OEM. These payment terms will affect their enthusiasm for participating in remanufacturing certification. By establishing game models among an OEM, a certified TPR, and an uncertified TPR, our paper explores three certification contracts, namely, the lump-sum payment, profit-sharing payment, and piece-rate payment. We identify the conditions for the OEM and certified TPR to reach a win-win outcome. Our results show that when TPRs have a high profit margin and there is no significant difference in consumers’ preferences between certified and non-certified remanufacturing channels, the profit-sharing payment contract yields the highest profit; otherwise, the piece-rate payment contract is best for the OEM.

  3. Mechanical solution of the maximum point of dynamic abutment pressure under deep long-wall working face

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, F.; Ma, Q. [Shandong University of Science and Technology, Tai' an (China). College of Resource and Environmental Engineering

    2002-06-01

    The paper studies the dynamic relationship between abutment pressure and overburden collapse precess with advancing of working face. The result shows that the abutment pressure reaches its maximum value when the working face dimension is 1.27 times of the mining depth. This result confirms the statistical result from the strata movement surveys that overburden reaches its full movement stage when extracting dimension reaches 1.2 1.4 times of the mining depth. 12 refs., 2 figs.

  4. Study about the Right to the Factoring Contract in Case Law STJ

    Directory of Open Access Journals (Sweden)

    Leandro Moraes do Espírito Santo

    2016-11-01

    Full Text Available This essay aims to examine the right of recourse in commercial development contract in the case law of the Supreme Court. In order to reach an appropriate response, the paper investigates the problem from Hans Kelsen's teachings to theory of law and legal interpretation as may be adopted in the Brazilian legal system.

  5. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Science.gov (United States)

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  6. Can De Sitter spacetime be a final state of the contracting universe

    International Nuclear Information System (INIS)

    Berezin, V.A.

    1984-01-01

    This chapter attempts to phenomenologically describe the final stage of the Universe contraction. A model equation of state is used to demonstrate that during a cosmological contraction a de Sitter spacetime may be produced. It is shown that a equilibrium thermodynamic description of the matter in cosmological models leads to the absence of particle creation. It is proposed that these nonequilibrium processes be taken into account by introducing a new additional thermodynamic variable showing the explicit time dependence of all thermodynamic potentials into the thermodynamic relations. The spacetime is assumed to be homogeneous and isotropic, and the energy momentum tensor includes not only the energy density and pressure for the matter and radiation, but it also includes contributions due to vacuum polarization by correspondent fields. It is demonstrated that it is possible to reach in principle the de Sitter spacetime as the limit of the contraction

  7. Maximum vehicle cabin temperatures under different meteorological conditions

    Science.gov (United States)

    Grundstein, Andrew; Meentemeyer, Vernon; Dowd, John

    2009-05-01

    A variety of studies have documented the dangerously high temperatures that may occur within the passenger compartment (cabin) of cars under clear sky conditions, even at relatively low ambient air temperatures. Our study, however, is the first to examine cabin temperatures under variable weather conditions. It uses a unique maximum vehicle cabin temperature dataset in conjunction with directly comparable ambient air temperature, solar radiation, and cloud cover data collected from April through August 2007 in Athens, GA. Maximum cabin temperatures, ranging from 41-76°C, varied considerably depending on the weather conditions and the time of year. Clear days had the highest cabin temperatures, with average values of 68°C in the summer and 61°C in the spring. Cloudy days in both the spring and summer were on average approximately 10°C cooler. Our findings indicate that even on cloudy days with lower ambient air temperatures, vehicle cabin temperatures may reach deadly levels. Additionally, two predictive models of maximum daily vehicle cabin temperatures were developed using commonly available meteorological data. One model uses maximum ambient air temperature and average daily solar radiation while the other uses cloud cover percentage as a surrogate for solar radiation. From these models, two maximum vehicle cabin temperature indices were developed to assess the level of danger. The models and indices may be useful for forecasting hazardous conditions, promoting public awareness, and to estimate past cabin temperatures for use in forensic analyses.

  8. DOD Electronic Commerce (EC)/Electronic Data Interchange (EDI) in contracting report

    Science.gov (United States)

    1993-12-01

    Use of Electronic Commerce (EC)/Electronic Data Interchange (EDI) to support Department of Defense (DoD) procurement processes has been under consideration for some time. A 1988 Deputy Secretary of Defense memo calls for maximum use of EDI, based on 10 years of DoD EDI investigation and experiments. In 1990, Defense Management Review Decision 941 stated, 'The strategic goal of DoD's current efforts is to provide the department with the capability to initiate, conduct, and maintain its external business related transactions and internal logistics, contracting, and financial activities without requiring the use of hard copy media.' The EC in Contracting PAT membership reflected a broad cross section of Military Services and Defense Agencies working on a full-time basis for 60 days. The diversity of the EC in Contracting PAT ensured that the needs and concerns of all DoD components were addressed during the creation of the report. The resultant plan, therefore, represents a comprehensive approach for implementing EC throughout the DoD.

  9. Fractal based complexity measure and variation in force during sustained isometric muscle contraction: effect of aging.

    Science.gov (United States)

    Arjunan, Sridhar P; Kumar, Dinesh K; Bastos, Teodiano

    2012-01-01

    This study has investigated the effect of age on the fractal based complexity measure of muscle activity and variance in the force of isometric muscle contraction. Surface electromyogram (sEMG) and force of muscle contraction were recorded from 40 healthy subjects categorized into: Group 1: Young - age range 20-30; 10 Males and 10 Females, Group 2: Old - age range 55-70; 10 Males and 10 Females during isometric exercise at Maximum Voluntary contraction (MVC). The results show that there is a reduction in the complexity of surface electromyogram (sEMG) associated with aging. The results demonstrate that there is an increase in the coefficient of variance (CoV) of the force of muscle contraction and a decrease in complexity of sEMG for the Old age group when compared with the Young age group.

  10. β-Adrenergic modulation of skeletal muscle contraction: key role of excitation-contraction coupling.

    Science.gov (United States)

    Cairns, Simeon P; Borrani, Fabio

    2015-11-01

    Our aim is to describe the acute effects of catecholamines/β-adrenergic agonists on contraction of non-fatigued skeletal muscle in animals and humans, and explain the mechanisms involved. Adrenaline/β-agonists (0.1-30 μm) generally augment peak force across animal species (positive inotropic effect) and abbreviate relaxation of slow-twitch muscles (positive lusitropic effect). A peak force reduction also occurs in slow-twitch muscles in some conditions. β2 -Adrenoceptor stimulation activates distinct cyclic AMP-dependent protein kinases to phosphorylate multiple target proteins. β-Agonists modulate sarcolemmal processes (increased resting membrane potential and action potential amplitude) via enhanced Na(+) -K(+) pump and Na(+) -K(+) -2Cl(-) cotransporter function, but this does not increase force. Myofibrillar Ca(2+) sensitivity and maximum Ca(2+) -activated force are unchanged. All force potentiation involves amplified myoplasmic Ca(2+) transients consequent to increased Ca(2+) release from sarcoplasmic reticulum (SR). This unequivocally requires phosphorylation of SR Ca(2+) release channels/ryanodine receptors (RyR1) which sensitize the Ca(2+) -induced Ca(2+) release mechanism. Enhanced trans-sarcolemmal Ca(2+) influx through phosphorylated voltage-activated Ca(2+) channels contributes to force potentiation in diaphragm and amphibian muscle, but not mammalian limb muscle. Phosphorylation of phospholamban increases SR Ca(2+) pump activity in slow-twitch fibres but does not augment force; this process accelerates relaxation and may depress force. Greater Ca(2+) loading of SR may assist force potentiation in fast-twitch muscle. Some human studies show no significant force potentiation which appears to be related to the β-agonist concentration used. Indeed high-dose β-agonists (∼0.1 μm) enhance SR Ca(2+) -release rates, maximum voluntary contraction strength and peak Wingate power in trained humans. The combined findings can explain how adrenaline

  11. IPP fuel contracts - creating certain contracts for uncertain times

    Energy Technology Data Exchange (ETDEWEB)

    Coddington, I. [Coddington International Pty. Ltd., Milsons Point, NSW (Australia)

    1998-12-31

    Coal contracts for the new Asian Independent Power Producers (IPPs) are examined. Since most IPPs will be selling to state electricity utilities, often in competition with power plant using other fuels, coal based IPPs must negotiate advantageous coal supply contracts several years before the commissioning of a plant, and must ensure security of supply for at least the life of the construction loan. A more recent trend in the developed world is the Merchant IPP, where there is no guaranteed electricity sale. Lenders are wary of IPPs relying an imported coal, and insist on binding fuel contracts, while coal companies are wary of the quantity of information demanded by these lenders. A full understanding of the risks involved is needed; and a method of price indexation for the contracts. Contracts must also specify security of supply, coal quality, freight contracts and other details. 2 figs.

  12. ADMINISTRATIVE CONTRACTS. DELIMITATIONS

    Directory of Open Access Journals (Sweden)

    Liana Teodora PASCARIU

    2016-12-01

    Full Text Available Article examines whether all contracts of public persons are administrative contracts; in other words, if the administration may conclude contracts that, according to their legal nature, are not administrative. If we start from the definition of administrative contracts as it appears in Law no. 554/2004, these include contracts by public authorities which concern the enhancement of public property execution of works of public interest, public services, public procurement and other administrative contracts provided by special laws and subject to the jurisdiction of the administrative courts.

  13. Electrical contracting

    CERN Document Server

    Neidle, Michael

    2013-01-01

    Electrical Contracting, Second Edition is a nine-chapter text guide for the greater efficiency in planning and completing installations for the design, installation and control of electrical contracts. This book starts with a general overview of the efficient cabling and techniques that must be employed for safe wiring design, as well as the cost estimation of the complete electrical contract. The subsequent chapters are devoted to other electrical contracting requirements, including electronic motor control, lighting, and electricity tariffs. A chapter focuses on the IEE Wiring Regulations an

  14. Administrative contracts

    OpenAIRE

    Vukićević-Petković Milica

    2015-01-01

    Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete u...

  15. Development of muscle fatigue as assessed by electromyography and mechanomyography during continuous and intermittent low-force contractions: effects of the feedback mode

    DEFF Research Database (Denmark)

    Madeleine, Pascal; Jørgensen, Lars Vincents; Søgaard, Karen

    2002-01-01

    ) and proprioceptive (displacement control) feedback was investigated during intermittent (6 s contraction, 4 s rest) and continuous static contractions at 10% and 30% of the maximum voluntary contraction (MVC). Mean force, force fluctuation, rating of perceived exertion and root mean square (RMS) and mean power...... with the EMG, while the decrease in MPF values was more consistent for the EMG compared with the MMG signal. During the intermittent contractions, the main effect was on MPF for both EMG and MMG. Lower force fluctuation and larger rating of perceived exertion ( P

  16. Analysis of the 314th Contracting Squadrons Contract Management Capability Using the Contract Management Maturity Model (CMMM)

    National Research Council Canada - National Science Library

    Jackson, Jr, Carl J

    2007-01-01

    .... The purpose of this research project is to analyze the 314th Contracting Squadron contracting processes and requirement target areas for improvement efforts by the application of the Contract Management Maturity Model (CMMM...

  17. Effect of contraction mode of slow-speed resistance training on the maximum rate of force development in the human quadriceps

    DEFF Research Database (Denmark)

    Blazevich, Anthony J; Horne, Sara; Cannavan, Dale

    2008-01-01

    This study examined the effects of slow-speed resistance training involving concentric (CON, n = 10) versus eccentric (ECC, n = 11) single-joint muscle contractions on contractile rate of force development (RFD) and neuromuscular activity (EMG), and its maintenance through detraining. Isokinetic...

  18. The Effects of Eccentric Contraction Duration on Muscle Strength, Power Production, Vertical Jump, and Soreness.

    Science.gov (United States)

    Mike, Jonathan N; Cole, Nathan; Herrera, Chris; VanDusseldorp, Trisha; Kravitz, Len; Kerksick, Chad M

    2017-03-01

    Mike, JN, Cole, N, Herrera, C, VanDusseldorp, T, Kravitz, L, and Kerksick, CM. The effects of eccentric contraction duration on muscle strength, power production, vertical jump, and soreness. J Strength Cond Res 31(3): 773-786, 2017-Previous research has investigated the effects of either eccentric-only training or comparing eccentric and concentric exercise on changes related to strength and power expression, but no research to date has investigated the impact of altering the duration of either the concentric or the eccentric component on these parameters. Therefore, the purpose of this study was to assess the duration of eccentric (i.e., 2-second, 4-second vs. 6-second) muscle contractions and their effect on muscle strength, power production, vertical jump, and soreness using a plate-loaded barbell Smith squat exercise. Thirty college-aged men (23 ± 3.5 years, 178 ± 6.8 cm, 82 ± 12 kg, and 11.6 ± 5.1% fat) with 3.0 ± 1.0 years of resistance training experience and training frequency of 4.3 ± 0.9 days per week were randomized and assigned to 1 of 3 eccentric training groups that incorporated different patterns of contraction. For every repetition, all 3 groups used 2-second concentric contractions and paused for 1 second between the concentric and eccentric phases. The control group (2S) used 2-second eccentric contractions, whereas the 4S group performed 4-second eccentric contractions and the 6S group performed 6-second eccentric contractions. All repetitions were completed using the barbell Smith squat exercise. All participants completed a 4-week training protocol that required them to complete 2 workouts per week using their prescribed contraction routine for 4 sets of 6 repetitions at an intensity of 80-85% one repetition maximum (1RM). For all performance data, significant group × time (G × T) interaction effects were found for average power production across all 3 sets of a squat jump protocol (p = 0.04) while vertical jump did not reach

  19. Optimal Velocity to Achieve Maximum Power Output – Bench Press for Trained Footballers

    OpenAIRE

    Richard Billich; Jakub Štvrtňa; Karel Jelen

    2015-01-01

    Optimal Velocity to Achieve Maximum Power Output – Bench Press for Trained Footballers In today’s world of strength training there are many myths surrounding effective exercising with the least possible negative effect on one’s health. In this experiment we focus on the finding of a relationship between maximum output, used load and the velocity with which the exercise is performed. The main objective is to find the optimal speed of the exercise motion which would allow us to reach the ma...

  20. Forearm muscle oxygenation during sustained isometric contractions in rock climbers

    Directory of Open Access Journals (Sweden)

    Jan Kodejška

    2016-02-01

    Full Text Available Background. Bouldering and lead climbing are divergent disciplines of the sport of rock climbing. Bouldering moves are short and powerful, whilst sport climbing is longer and require a greater degree of endurance. Aim. The aim of this study was to compare forearm muscle oxygenation during sustained isometric contraction between lead climbers (LC and boulderers (BO. Methods. Eight BO and twelve LC completed maximal finger flexor strength test and sustained contractions to exhaustion at 60% of maximum voluntary contraction (MVC. Differences between BO and LC in maximal strength, time to exhaustion, force time integral (FTI, and tissue oxygenation (SmO2 were assessed by t-test for independent samples. Results. LC showed significantly lower level of average tissue oxygenation (BO 38.9% SmO2, s = 7.4; LC 28.7% SmO2, s = 7.1 and maximal tissue deoxygenation (BO 25.6% SmO2, s = 8.2; LC 13.5% SmO2, s = 8.5. LC demonstrated significantly lower finger flexor strength (519 N, s = 72 than BO (621 N, s = 142. LC sustained a longer time of contraction (not significantly (BO 52.2 s, s = 11.5; LC 60.6 s, s = 13 and achieved a similar value of FTI (BO 17421 Ns, s = 4291; LO 17476 Ns, s = 5036 in the endurance test. Conclusions. The results showed lower deoxygenation during sustained contraction in BO than LC despite similar FTI, indicating different local metabolic pathways in both groups.

  1. Contracting with the Enemy: The Contracting Officer’s Dilemma

    Science.gov (United States)

    2015-06-01

    contracting command xv KO contracting officer KTR contractor LSC lead service component MGAA Mesopotamia Group Atlas Apache NAT National Afghanistan...and Contract Authority Understanding the roles of contracting versus command authority and command relationships is a fundamental that must be...Audit 12-7 (2012) described the CENTCOM-JTSCC (C- JTSCC) formation and command relationship : In April 2010, CENTCOM issued a fragmentary order to

  2. Motor unit activity when young and old adults perform steady contractions while supporting an inertial load

    Science.gov (United States)

    Gould, Jeffrey R.; Enoka, Roger M.

    2013-01-01

    The purpose of the study was to compare the discharge characteristics of biceps brachii motor units of young and old adults when they performed steady, submaximal contractions while the arm supported different inertial loads. Young (28 ± 4 yr; n = 16) and old (75 ± 4 yr; n = 14) adults performed steady contractions with the elbow flexors at target forces set at either small (11.7 ± 4.4% maximum) or large (17.8 ± 6.5% maximum) differences below the recruitment threshold force of the motor unit (n = 40). The task was to maintain an elbow angle at 1.57 rad until the motor unit was recruited and discharged action potentials for ∼120 s. Time to recruitment was longer for the larger target force difference (187 ± 227 s vs. 23 ± 46 s, P recruited, motor units discharged action potentials either repetitively or intermittently, with a greater proportion of motor units exhibiting the repetitive pattern for old adults. Discharge rate at recruitment and during the steady contraction was similar for the two target force differences for old adults but was greater for the small target force difference for young adults. Discharge variability was similar at recruitment for the two age groups but less for the old adults during the steady contraction. The greatest difference between the present results and those reported previously when the arm pulled against a rigid restraint was that old adults modulated discharge rate less than young adults across the two contraction intensities for both load types. PMID:23221403

  3. Changes in maximum muscle strength and rapid muscle force characteristics after long-term special support and reconnaissance missions

    DEFF Research Database (Denmark)

    Christensen, Peter Astrup; Jacobsen, Jacob Ole; Thorlund, Jonas B

    2008-01-01

    PURPOSE: The purpose of the present study was to examine the impact of 8 days of immobilization during a Special Support and Reconnaissance mission (SSR) on muscle mass, contraction dynamics, maximum jump height/power, and body composition. METHODS: Unilateral maximal voluntary contraction, rate...... of force development, and maximal jump height were tested to assess muscle strength/power along with whole-body impedance analysis before and after SSR. RESULTS: Body weight, fat-free mass, and total body water decreased (4-5%) after SSR, along with impairments in maximal jump height (-8%) and knee...... extensor maximal voluntary contraction (-10%). Furthermore, rate of force development was severely affected (-15-30%). CONCLUSIONS: Eight days of immobilization during a covert SSR mission by Special Forces soldiers led to substantial decrements in maximal muscle force and especially in rapid muscle force...

  4. Analysis the relationship between psychological contract and organisational justice perception of paramedical personnel

    Directory of Open Access Journals (Sweden)

    Necmettin Cihangiroglu

    2015-08-01

    Full Text Available This study was conducted to find out if the psychological contract and organizational justice perceptions of paramedical personnel were affected by their socio-demographic factors and to determine whether there is a significant relation between their psychological contract and organizational justice perceptions. The study has been sectionally contucted in July-August 2010, to a 1200 bed education and research hospital in Ankara. We aimed at reaching all of the paramedical personnel without any sampling. Of 600 questionnaires distributed, we collected 458 (76,3%. The questionnaire used for collecting data consists of three parts. The first part concentrates on the individual characteristics of health workers while the second part contains the 17 item Psychological Contract Scale developed by Millward and Hopkins (1998 that is based on the quantitative approach of psychological contract. ln the third part, we used the and ldquo;Organisational Justice Measurement'' with 17 statements developed by Colquitt (2001. One of the statements refers to the study of Iscan and Naktiyok (2004. The results of the study showed that the psychological contract and organizational justice perceptions of paramedical personnel were very low. Also, their psychological contract and organizational justice perceptions were significantly affected by gender (p0,05. In addition, it was seen that there was a significant but weak relationshlp between health workers' psychological contract and organizational justice perceptions. The results of this study can provide signiflcant information to the health care management to understand psychological contract and organisational justice perception of their paramedical personnel. [TAF Prev Med Bull 2015; 14(4.000: 293-299

  5. Why radiologists lose their hospital contracts: is your contract secure?

    Science.gov (United States)

    Muroff, Lawrence R

    2010-03-01

    Previously, a hospital contract meant tenure for the incumbent group of radiologists; however, those days are long gone. Exclusive contracts have morphed into exclusive contracts with carve-outs. Turf erosion has become a fact of life for radiology practices. Now radiologists are losing their hospital contracts in record numbers. Group size, though helpful for a variety of reasons, does not ensure that a practice will be secure in its hospital setting. The reasons that groups lose their hospital contracts are varied, and in this paper, the author discusses the most common ones. Suggestions to help practices avoid this unfortunate fate are presented.

  6. Reviving Ulysses contracts.

    Science.gov (United States)

    Spellecy, Ryan

    2003-12-01

    Ulysses contracts have faced paternalism objections since they first were proposed. Since the contracts are designed to override a present request from a legally competent patient in favor of a past request made by that patient, enforcement of these contracts was argued to be unjustifiable strong paternalism. Recent legal developments and new theories of practical reasoning suggest that the discussion of Ulysses contracts should be revived. This paper argues that with a proper understanding of the future-directed planning embodied in Ulysses contracts, the charge of strong paternalism can be answered, and the enforcement of some Ulysses contracts may be justified under the rubric of weak paternalism.

  7. The design of optimal electric power demand management contracts

    Science.gov (United States)

    Fahrioglu, Murat

    1999-11-01

    Our society derives a quantifiable benefit from electric power. In particular, forced outages or blackouts have enormous consequences on society, one of which is loss of economic surplus. Electric utilities try to provide reliable supply of electric power to their customers. Maximum customer benefit derives from minimum cost and sufficient supply availability. Customers willing to share in "availability risk" can derive further benefit by participating in controlled outage programs. Specifically, whenever utilities foresee dangerous loading patterns, there is a need for a rapid reduction in demand either system-wide or at specific locations. The utility needs to get relief in order to solve its problems quickly and efficiently. This relief can come from customers who agree to curtail their loads upon request in exchange for an incentive fee. This thesis shows how utilities can get efficient load relief while maximizing their economic benefit. This work also shows how estimated customer cost functions can be calibrated, using existing utility data, to help in designing efficient demand management contracts. In order to design such contracts, optimal mechanism design is adopted from "Game Theory" and applied to the interaction between a utility and its customers. The idea behind mechanism design is to design an incentive structure that encourages customers to sign up for the right contract and reveal their true value of power. If a utility has demand management contracts with customers at critical locations, most operational problems can be solved efficiently. This thesis illustrates how locational attributes of customers incorporated into demand management contract design can have a significant impact in solving system problems. This kind of demand management contracts can also be used by an Independent System Operator (ISO). During times of congestion a loss of economic surplus occurs. When the market is too slow or cannot help relieve congestion, demand management

  8. Biomechanical characteristics of skeletal muscles and associations between running speed and contraction time in 8- to 13-year-old children.

    Science.gov (United States)

    Završnik, Jernej; Pišot, Rado; Šimunič, Boštjan; Kokol, Peter; Blažun Vošner, Helena

    2017-02-01

    Objective To investigate associations between running speeds and contraction times in 8- to 13-year-old children. Method This longitudinal study analyzed tensiomyographic measurements of vastus lateralis and biceps femoris muscles' contraction times and maximum running speeds in 107 children (53 boys, 54 girls). Data were evaluated using multiple correspondence analysis. Results A gender difference existed between the vastus lateralis contraction times and running speeds. The running speed was less dependent on vastus lateralis contraction times in boys than in girls. Analysis of biceps femoris contraction times and running speeds revealed that running speeds of boys were much more structurally associated with contraction times than those of girls, for whom the association seemed chaotic. Conclusion Joint category plots showed that contraction times of biceps femoris were associated much more closely with running speed than those of the vastus lateralis muscle. These results provide insight into a new dimension of children's development.

  9. Coordinating a Service Supply Chain under Arms Offset Program’s Intervention by Performance-Based Contracting

    Directory of Open Access Journals (Sweden)

    Yi-Kuei Lin

    2016-01-01

    Full Text Available This paper investigates a support service supply chain for coordinating with a local third-party logistics provider by arms offset program’s intervention and develops a performance-based contracting framework for the coordinating problem, which remains scarce in the literatures. The performance-based contracting framework evaluates payments and profits for the support service by a game-theoretical approach with principal-agent model. We prove that the proposed framework is an effective tool in acquiring the balance between maximum profit and minimum payment for both parties in the coordinating problem without moral hazard issue. A numerical study consolidates the formulated schemes as contracting preference for both parties’ decision with a higher profit margin at a lower customer’s payment.

  10. Size dependence of efficiency at maximum power of heat engine

    KAUST Repository

    Izumida, Y.; Ito, N.

    2013-01-01

    We perform a molecular dynamics computer simulation of a heat engine model to study how the engine size difference affects its performance. Upon tactically increasing the size of the model anisotropically, we determine that there exists an optimum size at which the model attains the maximum power for the shortest working period. This optimum size locates between the ballistic heat transport region and the diffusive heat transport one. We also study the size dependence of the efficiency at the maximum power. Interestingly, we find that the efficiency at the maximum power around the optimum size attains a value that has been proposed as a universal upper bound, and it even begins to exceed the bound as the size further increases. We explain this behavior of the efficiency at maximum power by using a linear response theory for the heat engine operating under a finite working period, which naturally extends the low-dissipation Carnot cycle model [M. Esposito, R. Kawai, K. Lindenberg, C. Van den Broeck, Phys. Rev. Lett. 105, 150603 (2010)]. The theory also shows that the efficiency at the maximum power under an extreme condition may reach the Carnot efficiency in principle.© EDP Sciences Società Italiana di Fisica Springer-Verlag 2013.

  11. Size dependence of efficiency at maximum power of heat engine

    KAUST Repository

    Izumida, Y.

    2013-10-01

    We perform a molecular dynamics computer simulation of a heat engine model to study how the engine size difference affects its performance. Upon tactically increasing the size of the model anisotropically, we determine that there exists an optimum size at which the model attains the maximum power for the shortest working period. This optimum size locates between the ballistic heat transport region and the diffusive heat transport one. We also study the size dependence of the efficiency at the maximum power. Interestingly, we find that the efficiency at the maximum power around the optimum size attains a value that has been proposed as a universal upper bound, and it even begins to exceed the bound as the size further increases. We explain this behavior of the efficiency at maximum power by using a linear response theory for the heat engine operating under a finite working period, which naturally extends the low-dissipation Carnot cycle model [M. Esposito, R. Kawai, K. Lindenberg, C. Van den Broeck, Phys. Rev. Lett. 105, 150603 (2010)]. The theory also shows that the efficiency at the maximum power under an extreme condition may reach the Carnot efficiency in principle.© EDP Sciences Società Italiana di Fisica Springer-Verlag 2013.

  12. 76 FR 31410 - Federal Acquisition Regulation; Prohibition on Contracting With Inverted Domestic Corporations

    Science.gov (United States)

    2011-05-31

    ... with the tax code. The respondent cites both 6 U.S.C. 395 and 26 U.S.C. 7874, because they both require... offshore and also risked contracting officers reaching disparate conclusions. For these reasons, and the..., Regulatory Planning and Review dated September 30, 1993. This rule is not a major rule under 5 U.S.C. 804. IV...

  13. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  14. Fifth review meeting of the contracting parties of the joint convention

    International Nuclear Information System (INIS)

    Brennecke, Peter

    2015-01-01

    The 5 th Review Meeting of the ''Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management'' was held at International Atomic Energy Agency (IAEA) Headquarters in Vienna on 11 to 22 May 2015. Sixty-one of sixty-nine Contracting Parties with more than 700 delegates and the OECD/NEA as an observer attended the meeting. Within this regularly scheduled meeting every three years it is checked in which way the contracting parties meet the objectives of the Joint Convention, i.e., the respective national radioactive waste management policy and its implementation is critically reviewed, the respective reached safety level discussed and - where necessary - improvements suggested. As a result the Contracting Parties in particular concur that the 5 th Review Meeting encouraged constructive exchanges and sharing of knowledge. Some highlights of good progress and significant accomplishments since the 4 th Review Meeting include, e.g., the implementation of national policies, strategies and programs for spent fuel and radioactive waste management or the construction and commissioning of storage facilities and repositories for spent fuel and radioactive waste. The 6 th Review Meeting of the Contracting Parties to the Joint Convention will be held at IAEA Headquarters in Vienna on 21 May to 1 June 2018.

  15. Administrative contracts

    Directory of Open Access Journals (Sweden)

    Vukićević-Petković Milica

    2015-01-01

    Full Text Available Administrative contracts are a special type of contract where usually one of the contracting parties is a public law body and which is concluded for the performance of public service and the realization of a public interest. They go a long way since its inception to its eventual final acceptance of all the legal systems. One of the enduring characteristics of this type of contract is their disquised or unnoticed existence. This is why only monitoring their development may lead to a complete understanding of the importance and essence of this institution as well as the need for its complete legal regulation.

  16. Muscle power output properties using the stretch-shortening cycle of the upper limb and their relationships with a one-repetition maximum bench press.

    Science.gov (United States)

    Miyaguchi, Kazuyoshi; Demura, Shinichi

    2006-05-01

    The purpose of this study was to examine the output properties of muscle power by the dominant upper limb using SSC, and the relationships between the power output by SSC and a one-repetition maximum bench press (1 RM BP) used as a strength indicator of the upper body. Sixteen male athletes (21.4+/-0.9 yr) participated in this study. They pulled a load of 40% of maximum voluntary contraction (MVC) at a stretch by elbow flexion of the dominant upper limb in the following three preliminary conditions: static relaxed muscle state (SR condition), isometric muscle contraction state (ISO condition), and using SSC (SSC condition). The velocity with a wire load via a pulley during elbow flexion was measured accurately using a power instrument with a rotary encoder, and the muscle power curve was drawn from the product of the velocity and load. Significant differences were found among all evaluation parameters of muscle power exerted from the above three conditions and the parameters regarding early power output during concentric contraction were larger in the SSC condition than the SR and ISO conditions. The parameters on initial muscle contraction velocity when only using SSC significantly correlated with 1 RM BP (r=0.60-0.62). The use of SSC before powerful elbow flexion may contribute largely to early explosive power output during concentric contraction. Bench press capacity relates to a development of the above early power output when using SSC.

  17. Maximum Entropy Fundamentals

    Directory of Open Access Journals (Sweden)

    F. Topsøe

    2001-09-01

    Full Text Available Abstract: In its modern formulation, the Maximum Entropy Principle was promoted by E.T. Jaynes, starting in the mid-fifties. The principle dictates that one should look for a distribution, consistent with available information, which maximizes the entropy. However, this principle focuses only on distributions and it appears advantageous to bring information theoretical thinking more prominently into play by also focusing on the "observer" and on coding. This view was brought forward by the second named author in the late seventies and is the view we will follow-up on here. It leads to the consideration of a certain game, the Code Length Game and, via standard game theoretical thinking, to a principle of Game Theoretical Equilibrium. This principle is more basic than the Maximum Entropy Principle in the sense that the search for one type of optimal strategies in the Code Length Game translates directly into the search for distributions with maximum entropy. In the present paper we offer a self-contained and comprehensive treatment of fundamentals of both principles mentioned, based on a study of the Code Length Game. Though new concepts and results are presented, the reading should be instructional and accessible to a rather wide audience, at least if certain mathematical details are left aside at a rst reading. The most frequently studied instance of entropy maximization pertains to the Mean Energy Model which involves a moment constraint related to a given function, here taken to represent "energy". This type of application is very well known from the literature with hundreds of applications pertaining to several different elds and will also here serve as important illustration of the theory. But our approach reaches further, especially regarding the study of continuity properties of the entropy function, and this leads to new results which allow a discussion of models with so-called entropy loss. These results have tempted us to speculate over

  18. Army Contract Specialists’ Lack of Desire to Become Contracting Officers

    Science.gov (United States)

    2012-05-01

    response to question 2 was 1 or 2, choose all the responses that support the reasoning for your answer. B ). N o t en o u g h w el l tr ai n ed...contracting specialist set the goal of becoming a contracting officer? ACC 20 Contracting officer burnout Consider contracting officer rotations every 2 to

  19. An electromagnetism-like method for the maximum set splitting problem

    Directory of Open Access Journals (Sweden)

    Kratica Jozef

    2013-01-01

    Full Text Available In this paper, an electromagnetism-like approach (EM for solving the maximum set splitting problem (MSSP is applied. Hybrid approach consisting of the movement based on the attraction-repulsion mechanisms combined with the proposed scaling technique directs EM to promising search regions. Fast implementation of the local search procedure additionally improves the efficiency of overall EM system. The performance of the proposed EM approach is evaluated on two classes of instances from the literature: minimum hitting set and Steiner triple systems. The results show, except in one case, that EM reaches optimal solutions up to 500 elements and 50000 subsets on minimum hitting set instances. It also reaches all optimal/best-known solutions for Steiner triple systems.

  20. Inflation Forecast Contracts

    OpenAIRE

    Gersbach, Hans; Hahn, Volker

    2012-01-01

    We introduce a new type of incentive contract for central bankers: inflation forecast contracts, which make central bankers’ remunerations contingent on the precision of their inflation forecasts. We show that such contracts enable central bankers to influence inflation expectations more effectively, thus facilitating more successful stabilization of current inflation. Inflation forecast contracts improve the accuracy of inflation forecasts, but have adverse consequences for output. On balanc...

  1. Riparian Vegetation Mapping Along the Hanford Reach

    International Nuclear Information System (INIS)

    FOGWELL, T.W.

    2003-01-01

    During the biological survey and inventory of the Hanford Site conducted in the mid-1990s (1995 and 1996), preliminary surveys of the riparian vegetation were conducted along the Hanford Reach. These preliminary data were reported to The Nature Conservancy (TNC), but were not included in any TNC reports to DOE or stakeholders. During the latter part of FY2001, PNNL contracted with SEE Botanical, the parties that performed the original surveys in the mid 1990s, to complete the data summaries and mapping associated with the earlier survey data. Those data sets were delivered to PNNL and the riparian mapping by vegetation type for the Hanford Reach is being digitized during the first quarter of FY2002. These mapping efforts provide the information necessary to create subsequent spatial data layers to describe the riparian zone according to plant functional types (trees, shrubs, grasses, sedges, forbs). Quantification of the riparian zone by vegetation types is important to a number of DOE'S priority issues including modeling contaminant transport and uptake in the near-riverine environment and the determination of ecological risk. This work included the identification of vegetative zones along the Reach by changes in dominant plant species covering the shoreline from just to the north of the 300 Area to China Bar near Vernita. Dominant and indicator species included Agropyron dasytachyudA. smithii, Apocynum cannabinum, Aristida longiseta, Artemisia campestris ssp. borealis var scouleriana, Artemisa dracunculus, Artemisia lindleyana, Artemisia tridentata, Bromus tectorum, Chrysothamnus nauseosus, Coreopsis atkinsoniana. Eleocharis palustris, Elymus cinereus, Equisetum hyemale, Eriogonum compositum, Juniperus trichocarpa, Phalaris arundinacea, Poa compressa. Salk exigua, Scirpus acutus, Solidago occidentalis, Sporobolus asper,and Sporobolus cryptandrus. This letter report documents the data received, the processing by PNNL staff, and additional data gathered in FY2002

  2. Riparian Vegetation Mapping Along the Hanford Reach

    Energy Technology Data Exchange (ETDEWEB)

    FOGWELL, T.W.

    2003-07-11

    During the biological survey and inventory of the Hanford Site conducted in the mid-1990s (1995 and 1996), preliminary surveys of the riparian vegetation were conducted along the Hanford Reach. These preliminary data were reported to The Nature Conservancy (TNC), but were not included in any TNC reports to DOE or stakeholders. During the latter part of FY2001, PNNL contracted with SEE Botanical, the parties that performed the original surveys in the mid 1990s, to complete the data summaries and mapping associated with the earlier survey data. Those data sets were delivered to PNNL and the riparian mapping by vegetation type for the Hanford Reach is being digitized during the first quarter of FY2002. These mapping efforts provide the information necessary to create subsequent spatial data layers to describe the riparian zone according to plant functional types (trees, shrubs, grasses, sedges, forbs). Quantification of the riparian zone by vegetation types is important to a number of DOE'S priority issues including modeling contaminant transport and uptake in the near-riverine environment and the determination of ecological risk. This work included the identification of vegetative zones along the Reach by changes in dominant plant species covering the shoreline from just to the north of the 300 Area to China Bar near Vernita. Dominant and indicator species included Agropyron dasytachyudA. smithii, Apocynum cannabinum, Aristida longiseta, Artemisia campestris ssp. borealis var scouleriana, Artemisa dracunculus, Artemisia lindleyana, Artemisia tridentata, Bromus tectorum, Chrysothamnus nauseosus, Coreopsis atkinsoniana. Eleocharis palustris, Elymus cinereus, Equisetum hyemale, Eriogonum compositum, Juniperus trichocarpa, Phalaris arundinacea, Poa compressa. Salk exigua, Scirpus acutus, Solidago occidentalis, Sporobolus asper,and Sporobolus cryptandrus. This letter report documents the data received, the processing by PNNL staff, and additional data gathered in FY

  3. Reconciling Contracts and Relational Governance through Strategic Contracting

    DEFF Research Database (Denmark)

    Petersen, Bent; Østergaard, Kim

    2018-01-01

    on contract types, such as strategic versus conventional, may reconcile the enduring research controversy between the substitution and complements perspectives. Practical implications: Today, formal contracts with foreign distributors tend to resemble “prenuptial agreements”. The opportunity for relational...

  4. Spatial interaction between tissue pressure and skeletal muscle perfusion during contraction.

    Science.gov (United States)

    van Donkelaar, C C; Huyghe, J M; Vankan, W J; Drost, M R

    2001-05-01

    The vascular waterfall theory attributes decreased muscle perfusion during contraction to increased intramuscular pressure (P(IM)) and concomitant increase in venous resistance. Although P(IM) is distributed during contractions, this theory does not account for heterogeneity. This study hypothesises that pressure heterogeneity could affect the interaction between P(IM) rise and perfusion. Regional tissue perfusion during submaximum (100kPa) tetanic contraction is studied, using a finite element model of perfused contracting skeletal muscle. Capillary flow in muscles with one proximal artery and vein (SIM(1)) and with an additional distal artery and vein (SIM(2)) is compared. Blood flow and pressures at rest and P(IM) during contraction ( approximately 25kPa maximally) are similar between simulations, but capillary flow and venous pressure differ. In SIM(2), venous pressure and capillary flow correspond to P(IM) distribution, whereas capillary flow in SIM(1) is less than 10% of flow in SIM(2), in the muscle half without draining vein. This difference is caused by a high central P(IM), followed by central venous pressure rise, in agreement with the waterfall theory. The high central pressure (SIM(1)), obstructs outflow from the distal veins. Distal venous pressure rises until central blood pressure is reached, although local P(IM) is low. Adding a distal vein (SIM(2)) restores the perfusion. It is concluded that regional effects contribute to the interaction between P(IM) and perfusion during contraction. Unlike stated by the vascular waterfall theory, venous pressure may locally exceed P(IM). Although this can be explained by the principles of this theory, the theory does not include this phenomenon as such.

  5. The Contract Management Body of Knowledge: A Comparison of Contracting Competencies

    Science.gov (United States)

    2013-12-01

    and supply chain management policies in an effort to deliver higher returns for their companies ( KPMG , 2012). As purchasing becomes increasingly more...conservation, hazardous materials , and ozone-depleting substances (NCMA, 2011). Contract Structures (1.5) has to do with identifying specific contract types...discusses time and material contracts as well as cost, performance, and delivery incentives. Incentive and award-fee contracts pertaining to fixed-price

  6. HARMONIZATION OF THE CONSUMER CONTRACT DISPOSITIONS WITH THE GENERAL CONTRACT RULES

    Directory of Open Access Journals (Sweden)

    Alexandru MATEESCU

    2016-05-01

    Full Text Available This work contains and mainly tackles the contract of consumption, its differences and similitudes to a general contract, manners of applying it, and the way in which the former can be better coordinated and correlated to the general contracting terms, established by the civil law. Along the years, the consumption contract has undergone several addenda and it has come to represent an instrument of both refference and regulation for the socio-economical relations between two parties who have a commercial agreement. The general law frame has had a great influence in the development of the consumption contract, as well as on its applicability conditions and its manner of deployment. Through the development of the judicial law concerning the contract of concumption, this type of agreement has influenced, through its human and social nature, both the general contract, and the specific frame it relates to. The relationship between the two types of contract is one of interdependence, which is determined by the need of judicial regulation in the Romanian and European economy. The ceaselees development of interhuman relations pushes society towards maintaining a continuous study of the advancement of specific legislation and judicial regulation. The main purpose of this work is analyzing the general judicial frame and the way in which the differences between the general contract and the consumption one may represent a benefic and mutual influence on protecting the citizens’ rights, which in the case of the consumption contract encompasses the protection of consumers’ rights. Also, it will analyze the aspects that determine the manner of application and the the differences that can be surmounted in order to achieve a better cohesion between these types of contracts.

  7. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Science.gov (United States)

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  8. The Inclusion of Standard Terms in International Sales Contracts

    Directory of Open Access Journals (Sweden)

    S Eiselen

    2011-04-01

    Full Text Available The problem dealing with the inclusion of standard terms and conditions in contracts is a problem that has engaged most legal systems. The United Nations Convention on Contracts for the International Sale of Goods, Vienna 1980 (CISG does not expressly deal with this problem. Accordingly the solution to the issue must be found in an interpretation and application of the general principles found in articles 8, 14 and 18. One of the main objects of the CISG is the harmonisation of international trade law. It is generally recognised that in order to achieve harmonisation it isnecessary that courts should interpret and apply the convention in a consistent and harmonious manner. Unfortunately a number of approaches have emerged from courts around the world in regard to the inclusion of standard terms. German courts have developed a strict approach which requires that the standard terms be madeavailable to the addressee at the time of the conclusion of the contract. They also require that the standard terms be couched in the language of the main contract. In stark contrast an American court has used an approach which is very lax in regard to incorporation, even allowing incorporation after the conclusion of the contract. There is, however a more moderate approach set out in decisions of the Austrian Supreme Court where the court adopted an approach which is more akin to that found in most legal systems, namely that a clear incorporation clause in the contract is sufficient for the effective incorporation of standard terms. The author critically examines the case law, the various approaches and the underlying arguments on which they are based, before reaching the conclusion that the two extreme approaches should be rejected in favour of the more moderate approach. This approach is founded on aproper interpretation of the provisions of the CISG as well as being in step with international trade practice.

  9. Efficient algorithms for maximum likelihood decoding in the surface code

    Science.gov (United States)

    Bravyi, Sergey; Suchara, Martin; Vargo, Alexander

    2014-09-01

    We describe two implementations of the optimal error correction algorithm known as the maximum likelihood decoder (MLD) for the two-dimensional surface code with a noiseless syndrome extraction. First, we show how to implement MLD exactly in time O (n2), where n is the number of code qubits. Our implementation uses a reduction from MLD to simulation of matchgate quantum circuits. This reduction however requires a special noise model with independent bit-flip and phase-flip errors. Secondly, we show how to implement MLD approximately for more general noise models using matrix product states (MPS). Our implementation has running time O (nχ3), where χ is a parameter that controls the approximation precision. The key step of our algorithm, borrowed from the density matrix renormalization-group method, is a subroutine for contracting a tensor network on the two-dimensional grid. The subroutine uses MPS with a bond dimension χ to approximate the sequence of tensors arising in the course of contraction. We benchmark the MPS-based decoder against the standard minimum weight matching decoder observing a significant reduction of the logical error probability for χ ≥4.

  10. Energy dependence of CP-violation reach for monochromatic neutrino beam

    Science.gov (United States)

    Bernabéu, José; Espinoza, Catalina

    2008-06-01

    The ultimate goal of future neutrino facilities is the determination of CP violation in neutrino oscillations. Besides | U (e 3) | ≠ 0, this will require precision experiments with a very intense neutrino source and energy control. With this objective in mind, the creation of monochromatic neutrino beams from the electron capture decay of boosted ions by the SPS of CERN has been proposed. We discuss the capabilities of such a facility as a function of the energy of the boost and the baseline for the detector. We compare the physics potential for two different configurations: (I) γ = 90 and γ = 195 (maximum achievable at present SPS) to Frejus; (II) γ = 195 and γ = 440 (maximum achievable at upgraded SPS) to Canfranc. We conclude that the SPS upgrade to 1000 GeV is important to reach a better sensitivity to CP violation iff it is accompanied by a longer baseline.

  11. Energy dependence of CP-violation reach for monochromatic neutrino beam

    International Nuclear Information System (INIS)

    Bernabeu, Jose; Espinoza, Catalina

    2008-01-01

    The ultimate goal of future neutrino facilities is the determination of CP violation in neutrino oscillations. Besides |U(e3)|≠0, this will require precision experiments with a very intense neutrino source and energy control. With this objective in mind, the creation of monochromatic neutrino beams from the electron capture decay of boosted ions by the SPS of CERN has been proposed. We discuss the capabilities of such a facility as a function of the energy of the boost and the baseline for the detector. We compare the physics potential for two different configurations: (I) γ=90 and γ=195 (maximum achievable at present SPS) to Frejus; (II) γ=195 and γ=440 (maximum achievable at upgraded SPS) to Canfranc. We conclude that the SPS upgrade to 1000 GeV is important to reach a better sensitivity to CP violation iff it is accompanied by a longer baseline

  12. Pier and contraction scour prediction in cohesive soils at selected bridges in Illinois

    Science.gov (United States)

    Straub, Timothy D.; Over, Thomas M.

    2010-01-01

    This report presents the results of testing the Scour Rate In Cohesive Soils-Erosion Function Apparatus (SRICOS-EFA) method for estimating scour depth of cohesive soils at 15 bridges in Illinois. The SRICOS-EFA method for complex pier and contraction scour in cohesive soils has two primary components. The first component includes the calculation of the maximum contraction and pier scour (Zmax). The second component is an integrated approach that considers a time factor, soil properties, and continued interaction between the contraction and pier scour (SRICOS runs). The SRICOS-EFA results were compared to scour prediction results for non-cohesive soils based on Hydraulic Engineering Circular No. 18 (HEC-18). On average, the HEC-18 method predicted higher scour depths than the SRICOS-EFA method. A reduction factor was determined for each HEC-18 result to make it match the maximum of three types of SRICOS run results. The unconfined compressive strength (Qu) for the soil was then matched with the reduction factor and the results were ranked in order of increasing Qu. Reduction factors were then grouped by Qu and applied to each bridge site and soil. These results, and comparison with the SRICOS Zmax calculation, show that less than half of the reduction-factor method values were the lowest estimate of scour; whereas, the Zmax method values were the lowest estimate for over half. A tiered approach to predicting pier and contraction scour was developed. There are four levels to this approach numbered in order of complexity, with the fourth level being a full SRICOS-EFA analysis. Levels 1 and 2 involve the reduction factors and Zmax calculation, and can be completed without EFA data. Level 3 requires some surrogate EFA data. Levels 3 and 4 require streamflow for input into SRICOS. Estimation techniques for both EFA surrogate data and streamflow data were developed.

  13. Dynamic clinical measurements of voluntary vaginal contractions and autonomic vaginal reflexes.

    Science.gov (United States)

    Broens, Paul M A; Spoelstra, Symen K; Weijmar Schultz, Willibrord C M

    2014-12-01

    The vaginal canal is an active and responsive canal. It has pressure variations along its length and shows reflex activity. At present, the prevailing idea is that the vaginal canal does not have a sphincter mechanism. It is hypothesized that an active vaginal muscular mechanism exists and might be involved in the pathophysiology of genito-pelvic pain/penetration disorder. The aim of this study was to detect the presence of a canalicular vaginal "sphincter mechanism" by measuring intravaginal pressure at different levels of the vaginal canal during voluntary pelvic floor contractions and during induced reflexive contractions. Sixteen nulliparous women, without sexual dysfunction and pelvic floor trauma, were included in the study. High-resolution solid-state circumferential catheters were used to measure intravaginal pressures and vaginal contractions at different levels in the vaginal canal. Voluntary intravaginal pressure measurements were performed in the left lateral recumbent position only, while reflexive intravaginal pressure measurements during slow inflation of a vaginal balloon were performed in the left lateral recumbent position and in the sitting position. Intravaginal pressures and vaginal contractions were the main outcome measures. In addition, a general demographic and medical history questionnaire was administered to gain insight into the characteristics of the study population. Fifteen out of the sixteen women had deep and superficial vaginal high-pressure zones. In one woman, no superficial high-pressure zone was found. The basal and maximum pressures, as well as the duration of the autonomic reflexive contractions significantly exceeded the pressures and the duration of the voluntary contractions. There were no significant differences between the reflexive measurements obtained in the left lateral recumbent and the sitting position. The two high-pressure zones found in this study, as a result of voluntary contractions and, even more pronounced

  14. Drilling contract issues

    International Nuclear Information System (INIS)

    Davison, G.B.; Worden, D.R.; Borbridge, G.K.D.

    1997-01-01

    Some selected issues which are facing both operators and contractors in drilling for oil and gas, such as the allocation of risk by contract and by statute and the implementation of new technologies, were discussed. There are three varieties of written drilling contracts used in Canada: (1) day work and meterage contracts, (2) master drilling agreements, and (3) contracts that are used in construction projects that do not specifically relate to drilling. Issues relevant to the contractual allocation of risk, to implementing new drilling technologies, to reconciling contract and statute liability, and the formation of strategic alliances for mutual benefit, and the factors contributing to the success of such alliances were explored. 12 refs

  15. Isometric Contractions Are More Analgesic Than Isotonic Contractions for Patellar Tendon Pain: An In-Season Randomized Clinical Trial.

    Science.gov (United States)

    Rio, Ebonie; van Ark, Mathijs; Docking, Sean; Moseley, G Lorimer; Kidgell, Dawson; Gaida, Jamie E; van den Akker-Scheek, Inge; Zwerver, Johannes; Cook, Jill

    2017-05-01

    This study aimed to compare the immediate analgesic effects of 2 resistance programs in in-season athletes with patellar tendinopathy (PT). Resistance training is noninvasive, a principle stimulus for corticospinal and neuromuscular adaptation, and may be analgesic. Within-season randomized clinical trial. Data analysis was conducted blinded to group. Subelite volleyball and basketball competitions. Twenty jumping athletes aged more than 16 years, participating in games/trainings 3 times per week with clinically diagnosed PT. Two quadriceps resistance protocols were compared; (1) isometric leg extension holds at 60 degrees knee flexion (80% of their maximal voluntary isometric contraction) or (2) isotonic leg extension (at 80% of their 8 repetition maximum) 4 times per week for 4 weeks. Time under load and rest between sets was matched between groups. (1) Pain (0-10 numerical rating score) during single leg decline squat (SLDS), measured preintervention and postintervention sessions. (2) VISA-P, a questionnaire about tendon pain and function, completed at baseline and after 4 weeks. Twenty athletes with PT (18 men, mean 22.5 ± 4.7 years) participated (isotonic n = 10, isometric n = 10). Baseline median SLDS pain was 5/10 for both groups (isotonic range 1-8, isometric range 2-8). Isometric contractions produced significantly greater immediate analgesia (P < 0.002). Week one analgesic response positively correlated with improvements in VISA-P at 4 weeks (r = 0.64). Both protocols appear efficacious for in-season athletes to reduce pain, however, isometric contractions demonstrated significantly greater immediate analgesia throughout the 4-week trial. Greater analgesia may increase the ability to load or perform.

  16. The 340B discount program: outpatient prescription dispensing patterns through contract pharmacies in 2012.

    Science.gov (United States)

    Clark, Bobby L; Hou, John; Chou, Chia-Hung; Huang, Elbert S; Conti, Rena

    2014-11-01

    Section 340B of the Public Health Service Act provides qualified organizations serving vulnerable populations with deep discounts for some outpatient medications. A 2010 regulatory change widely expanded the 340B program's reach, allowing these organizations to contract with retail pharmacies to dispense medications for eligible patients. Little is known about which medications are dispensed by contract pharmacies under the expanded program. We provide the first comparison of 340B prescriptions and all prescriptions dispensed in contract pharmacies. We used 2012 data from Walgreens, the national leader in 340B contract pharmacies. Medications used to treat chronic conditions such as diabetes, high cholesterol levels, asthma, and depression accounted for an overwhelming majority of all prescriptions dispensed at Walgreens as part of the 340B program. A higher percentage of antiretrovirals used to treat HIV/AIDS were dispensed through 340B prescriptions than through all prescriptions dispensed at Walgreens. The majority of 340B prescriptions dispensed at Walgreens originated at tuberculosis clinics, consolidated health centers, disproportionate-share hospitals, and Ryan White clinics. Our results suggest that 340B contract pharmacies dispense medications used to treat Americans' chronic disease burden and disproportionately dispense medications used by key vulnerable populations targeted by the program. Project HOPE—The People-to-People Health Foundation, Inc.

  17. Unfair contract terms in B2C contracts

    NARCIS (Netherlands)

    Hesselink, M.W.; Loos, M.B.M.

    2012-01-01

    Because of its textual similarity to the Unfair Terms Directive 1993, Chapter 8 of the proposed CESL, on ‘Unfair contract terms’, can benefit from two decades of interpretative experience which is likely to provide a comparably high degree of instant legal certainty to contracting parties.

  18. Teaching about Contracts.

    Science.gov (United States)

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  19. Possible contraction of the members of the binary pulsar PSR 1913+16 and its astrophysical consequences

    International Nuclear Information System (INIS)

    Spyrou, N.

    1983-01-01

    It is proposed that the small difference between the observed and the theoretically predicted decrease of the orbital period of the Binary Pulsar PSR 1913+16 is not due to the insufficiency of the quadrupole formula and can be attributed to a mass-energy loss due to the contraction of the binary's members. Assuming that the pair's primary is a typical, noncontracting pulsar, is in favour of a slowly contracting, neutron-star companion, thus limiting the member's radii to at most 25 km and 28 km, respectively. The primary's computed total absolute luminosity is in excellent agreement with the observed upper limit of its X-ray and optical luminosities. Moreover, the companion's slow contraction rate implies that its present total absolute luminosity presents a maximum at wavelengths characteristic of X-rays. Finally, it suggests that if the energy-loss remains constant, the duration of the contraction phase will be of the order of 10 8 y and the final radius about 25 km. (Auth.)

  20. Dynamic model of the octopus arm. I. Biomechanics of the octopus reaching movement.

    Science.gov (United States)

    Yekutieli, Yoram; Sagiv-Zohar, Roni; Aharonov, Ranit; Engel, Yaakov; Hochner, Binyamin; Flash, Tamar

    2005-08-01

    The octopus arm requires special motor control schemes because it consists almost entirely of muscles and lacks a rigid skeletal support. Here we present a 2D dynamic model of the octopus arm to explore possible strategies of movement control in this muscular hydrostat. The arm is modeled as a multisegment structure, each segment containing longitudinal and transverse muscles and maintaining a constant volume, a prominent feature of muscular hydrostats. The input to the model is the degree of activation of each of its muscles. The model includes the external forces of gravity, buoyancy, and water drag forces (experimentally estimated here). It also includes the internal forces generated by the arm muscles and the forces responsible for maintaining a constant volume. Using this dynamic model to investigate the octopus reaching movement and to explore the mechanisms of bend propagation that characterize this movement, we found the following. 1) A simple command producing a wave of muscle activation moving at a constant velocity is sufficient to replicate the natural reaching movements with similar kinematic features. 2) The biomechanical mechanism that produces the reaching movement is a stiffening wave of muscle contraction that pushes a bend forward along the arm. 3) The perpendicular drag coefficient for an octopus arm is nearly 50 times larger than the tangential drag coefficient. During a reaching movement, only a small portion of the arm is oriented perpendicular to the direction of movement, thus minimizing the drag force.

  1. The effects of hospitals' governance on optimal contracts: bargaining vs. contracting.

    Science.gov (United States)

    Galizzi, Matteo M; Miraldo, Marisa

    2011-03-01

    We propose a two-stage model to study the impact of different hospitals' governance frameworks on the optimal contracts designed by third-party payers when patients' disease severity is the private information of the hospital. In the second stage, doctors and managers interact within either a bargaining or a contracting scenario. In the contracting scenario, managers offer a contract that determines the payment to doctors, and doctors decide how many patients to treat. In the bargaining scenario, doctors and managers strategically negotiate on both the payment to doctors and the number of patients to treat. We derive the equilibrium doctors' payments and number of treated patients under both scenarios. We then derive the optimal contract offered by the government to the hospital in the first stage. Results show that when the cost of capital is sufficiently low, the informational rent is lower, and the social welfare is higher, in the contracting scenario. Copyright © 2010 Elsevier B.V. All rights reserved.

  2. Take-or-pay contract robustness: A three step story told by the Brazil-Bolivia gas case?

    International Nuclear Information System (INIS)

    Glachant, Jean-Michel; Hallack, Michelle

    2009-01-01

    Neo-institutional economics (NEI) has long shown that take-or-pay (ToP) long-term contracts provide a robust framework for safeguarding the interests of both upstream and downstream parties in the gas industry. The case of gas trade between Brazil and Bolivia presents an opportunity to re-examine empirically and to review the robust nature of the ToP framework over time. This case reveals that the positions of the contractors actually change giving rise to a veritable lifecycle of the contractual arrangement. Such a contract can be seen to span three successive phases. The first phase of the contract cycle begins when it is signed; allowing the investments to begin. The second phase starts when investments have been completed and the actual trade in gas begins. The third phase of the contract cycle comes when the increasing flow of gas comes close to saturating capacity and the volume levels for downstream market volume have been reached. These three contract phases are thus distinguished by how robust the alignment of the parties' interests is. The added value of the paper is then both empirical and analytical: the case study provides a brand new lifecycle analysis of the performance of ToP long-term contracting into an NEI framework

  3. The Relationship between the Employment Contract and other Civil Contracts

    Directory of Open Access Journals (Sweden)

    Răzvan Radu Popescu

    2015-05-01

    Full Text Available The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is unlike most other contracts. Although the parties will have negotiated the main terms, we shall see that a large number of terms will be implied into the agreement from all sorts of different sources and will not have been individually negotiated by the parties at all. This is what makes an employment contract so different from other contracts. We think this article is an important step in the disclosure of the problem eraised by these two concepts.

  4. Adaptation of reach-to-grasp movement in response to force perturbations.

    Science.gov (United States)

    Rand, M K; Shimansky, Y; Stelmach, G E; Bloedel, J R

    2004-01-01

    This study examined how reach-to-grasp movements are modified during adaptation to external force perturbations applied on the arm during reach. Specifically, we examined whether the organization of these movements was dependent upon the condition under which the perturbation was applied. In response to an auditory signal, all subjects were asked to reach for a vertical dowel, grasp it between the index finger and thumb, and lift it a short distance off the table. The subjects were instructed to do the task as fast as possible. The perturbation was an elastic load acting on the wrist at an angle of 105 deg lateral to the reaching direction. The condition was modified by changing the predictability with which the perturbation was applied in a given trial. After recording unperturbed control trials, perturbations were applied first on successive trials (predictable perturbations) and then were applied randomly (unpredictable perturbations). In the early predictable perturbation trials, reach path length became longer and reaching duration increased. As more predictable perturbations were applied, the reach path length gradually decreased and became similar to that of control trials. Reaching duration also decreased gradually as the subjects adapted by exerting force against the perturbation. In addition, the amplitude of peak grip aperture during arm transport initially increased in response to repeated perturbations. During the course of learning, it reached its maximum and thereafter slightly decreased. However, it did not return to the normal level. The subjects also adapted to the unpredictable perturbations through changes in both arm transport and grasping components, indicating that they can compensate even when the occurrence of the perturbation cannot be predicted during the inter-trial interval. Throughout random perturbation trials, large grip aperture values were observed, suggesting that a conservative aperture level is set regardless of whether the

  5. Negotiating Efficient PPP Contracts

    DEFF Research Database (Denmark)

    Tvarnø, Christina D.

    . An opportunity the member states should consider using when procuring a PPP. This paper looks at the negotiation and contracting of a PPP in an economic theoretical and EU public procurement perspective and discusses how to establish an efficient PPP contract under a strong public law doctrine. Governments......This paper concerns Public Private Partnership (PPP) contracts in concern to the coming new 2014/24IEU public procurement directive. The new EU public procurement directive gives the public authority the opportunity to negotiate PPPs much more when they are implemented in national law...... procurement law. Furthermore, the paper seeks to establish a connection between public law, private law and the efficient PPP contract by drawing upon economic theory and empirical contract data from UK, US and Danish partnering contracts from the construction industry and the aim of contracting joint utility...

  6. Duration in Production Contracts

    OpenAIRE

    MacDonald, James M.; Korb, Penelope J.

    2006-01-01

    We use 2003 and 2004 ARMS data to analyze variations in contract duration among growers of broilers who hold production contracts. Most contracts cover just a single flock, but many extend for 1-2 years, and a significant minority of broiler contracts specify lengths of 5, 10, and even 15 years. We find that grower debt and production volume are inversely related to the choice of a short term (a year or less) contract, while lengthy prior experience with the contractor promotes short term con...

  7. Experiments on supply chain contracting: effects of contract type and fairness concerns

    OpenAIRE

    Arabacı, Özge; Arabaci, Ozge

    2013-01-01

    In this thesis, we conduct experiments with human decision makers on supply chain contracting. We consider a simple manufacturer-retailer supply chain scenario where the retailer faces the newsvendor problem. Building on Sahin and Kaya (2011), we compare the experimental performance of three contract types (wholesale price, buyback and revenue sharing contracts) between the firms with theoretical predictions, and among each other. We are interested in the manufacturer’s contract parameter dec...

  8. Defense Contract Management: DOD's Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk

    National Research Council Canada - National Science Library

    Hutton, John P; Ahearn, Marie; Augustine, Penny B; Campbell, Greg; James, Jr., Arthur; Lesonsky, Eric; Lord, Stephen; McDonough-Hughes, Anne; McKelvey, Janet; Patton, Kenneth

    2007-01-01

    .... The contract was also used to ensure adequate fuel supplies inside Iraq. RIO I was a cost-plus-award-fee type contract that provided for payment of the contractor's costs, a fixed fee determined at inception of the contract, and a potential award fee...

  9. Maximum swimming speeds of sailfish and three other large marine predatory fish species based on muscle contraction time and stride length

    DEFF Research Database (Denmark)

    Svendsen, Morten Bo Søndergaard; Domenici, Paolo; Marras, Stefano

    2016-01-01

    Billfishes are considered to be among the fastest swimmers in the oceans. Previous studies have estimated maximum speed of sailfish and black marlin at around 35 m s(-1) but theoretical work on cavitation predicts that such extreme speed is unlikely. Here we investigated maximum speed of sailfish...

  10. A General Mathematical Algorithm for Predicting the Course of Unfused Tetanic Contractions of Motor Units in Rat Muscle.

    Directory of Open Access Journals (Sweden)

    Rositsa Raikova

    Full Text Available An unfused tetanus of a motor unit (MU evoked by a train of pulses at variable interpulse intervals is the sum of non-equal twitch-like responses to these stimuli. A tool for a precise prediction of these successive contractions for MUs of different physiological types with different contractile properties is crucial for modeling the whole muscle behavior during various types of activity. The aim of this paper is to develop such a general mathematical algorithm for the MUs of the medial gastrocnemius muscle of rats. For this purpose, tetanic curves recorded for 30 MUs (10 slow, 10 fast fatigue-resistant and 10 fast fatigable were mathematically decomposed into twitch-like contractions. Each contraction was modeled by the previously proposed 6-parameter analytical function, and the analysis of these six parameters allowed us to develop a prediction algorithm based on the following input data: parameters of the initial twitch, the maximum force of a MU and the series of pulses. Linear relationship was found between the normalized amplitudes of the successive contractions and the remainder between the actual force levels at which the contraction started and the maximum tetanic force. The normalization was made according to the amplitude of the first decomposed twitch. However, the respective approximation lines had different specific angles with respect to the ordinate. These angles had different and non-overlapping ranges for slow and fast MUs. A sensitivity analysis concerning this slope was performed and the dependence between the angles and the maximal fused tetanic force normalized to the amplitude of the first contraction was approximated by a power function. The normalized MU contraction and half-relaxation times were approximated by linear functions depending on the normalized actual force levels at which each contraction starts. The normalization was made according to the contraction time of the first contraction. The actual force levels

  11. Attenuating reaches and the regional flood response of an urbanizing drainage basin

    Science.gov (United States)

    Turner-Gillespie, Daniel F.; Smith, James A.; Bates, Paul D.

    The Charlotte, North Carolina metropolitan area has experienced extensive urban and suburban growth and sharply increasing trends in the magnitude and frequency of flooding. The hydraulics and hydrology of flood response in the region are examined through a combination of numerical modeling studies and diagnostic analyses of paired discharge observations from upstream-downstream gaging stations. The regional flood response is shown to strongly reflect urbanization effects, which increase flood peaks and decrease response times, and geologically controlled attenuating reaches, which decrease flood peaks and increase lag times. Attenuating reaches are characterized by systematic changes in valley bottom geometry and longitudinal profile. The morphology of the fluvial system is controlled by the bedrock geology, with pronounced changes occurring at or near contacts between intrusive igneous and metamorphic rocks. Analyses of wave celerity and flood peak attenuation over a range of discharge values for an 8.3 km valley bottom section of Little Sugar Creek are consistent with Knight and Shiono's characterization of the variation of flood wave velocity from in-channel conditions to valley bottom full conditions. The cumulative effect of variation in longitudinal profile, expansions and contractions of the valley bottom, floodplain roughness and sub-basin flood response is investigated using a two-dimensional, depth-averaged, finite element hydrodynamic model coupled with a distributed hydrologic model. For a 10.1 km stream reach of Briar Creek, with drainage area ranging from 13 km 2 at the upstream end of the reach to 49 km 2 at the downstream end, it is shown that flood response reflects a complex interplay of hydrologic and hydraulic processes on hillslopes and valley bottoms.

  12. Operational forecasting of daily temperatures in the Valencia Region. Part I: maximum temperatures in summer.

    Science.gov (United States)

    Gómez, I.; Estrela, M.

    2009-09-01

    Extreme temperature events have a great impact on human society. Knowledge of summer maximum temperatures is very useful for both the general public and organisations whose workers have to operate in the open, e.g. railways, roadways, tourism, etc. Moreover, summer maximum daily temperatures are considered a parameter of interest and concern since persistent heat-waves can affect areas as diverse as public health, energy consumption, etc. Thus, an accurate forecasting of these temperatures could help to predict heat-wave conditions and permit the implementation of strategies aimed at minimizing the negative effects that high temperatures have on human health. The aim of this work is to evaluate the skill of the RAMS model in determining daily maximum temperatures during summer over the Valencia Region. For this, we have used the real-time configuration of this model currently running at the CEAM Foundation. To carry out the model verification process, we have analysed not only the global behaviour of the model for the whole Valencia Region, but also its behaviour for the individual stations distributed within this area. The study has been performed for the summer forecast period of 1 June - 30 September, 2007. The results obtained are encouraging and indicate a good agreement between the observed and simulated maximum temperatures. Moreover, the model captures quite well the temperatures in the extreme heat episodes. Acknowledgement. This work was supported by "GRACCIE" (CSD2007-00067, Programa Consolider-Ingenio 2010), by the Spanish Ministerio de Educación y Ciencia, contract number CGL2005-03386/CLI, and by the Regional Government of Valencia Conselleria de Sanitat, contract "Simulación de las olas de calor e invasiones de frío y su regionalización en la Comunidad Valenciana" ("Heat wave and cold invasion simulation and their regionalization at Valencia Region"). The CEAM Foundation is supported by the Generalitat Valenciana and BANCAIXA (Valencia, Spain).

  13. Intramuscular fatty acid metabolism in contracting and non-contracting human skeletal muscle

    DEFF Research Database (Denmark)

    Sacchetti, M; Saltin, B; Osada, T

    2002-01-01

    The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercis...... and degraded and that the metabolic fate of plasma NEFA entering the muscle is influenced by muscle contraction, so that a higher proportion is directed towards oxidation at the expense of storage in mTAG.......The present study was undertaken to investigate the fate of blood-borne non-esterified fatty acids (NEFA) entering contracting and non-contracting knee extensor muscles of healthy young individuals. [U-(13)C]-palmitate was infused into a forearm vein during 5 h of one-legged knee extensor exercise.......05) in the contracting muscle, whereas it was unchanged in the non-contracting muscle. The uptake of plasma NEFA, as well as the proportion directed towards oxidation, was higher in the exercising compared to the non-exercising leg, whereas the rate of palmitate incorporation into mTAG was fourfold lower (0.70 +/- 0...

  14. 48 CFR 937.7040 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 937.7040... CONTRACTING SERVICE CONTRACTING Protective Services Contracting 937.7040 Contract clauses. The contracting... services” in all protective services solicitations and contracts involving DOE-owned facilities requiring...

  15. MEDIATION CLAUSE IN COMMERCIAL CONTRACTS (THE ADVANTAGES OF MEDIATION CLAUSE IN COMMERCIAL CONTRACTS

    Directory of Open Access Journals (Sweden)

    Claudiu Florinel Augustin Ignat

    2013-11-01

    Full Text Available It often happens that the end of the contracts to be existing commercial relationships and a new contract has already intuitu personae character. But not always the case, that those who enter into legal commercial forcing consideration to the benefits and under commercial contracts, know the dealer or individual that established commercial relations. These traders resort to contractual conditions which states precisely the extent of the obligations assumed by each party, setting rules, deadlines, penalties and even ways of interpretation of contracts. Contracting Parties, namely traders aware that the law is the contract parties by special caluze invest ( to settle disputes concerning the interpretation or punishment for failure and even termination obligations tribunalule arbitration courts or the territorial and material .

  16. THE PSYCHOLOGICAL CONTRACT

    Directory of Open Access Journals (Sweden)

    Blanca Giorgiana GRAMA

    2015-04-01

    Full Text Available The psychological contract became known as a research paradigm within corporate research, providing a broad framework which explains the employee-company relations. Despite all this, there are still many debates on the concept and a series of criticism were expressed that led to the necessity of some more rigorous theoretical and empirical analysis. The psychological contract refers to the unwritten, implicit expectations that employees have from the company and vice versa; it is that which defines the things the employee expects from the employer. Consequently, each of the parties involved in the contract may have different perceptions on these commitments and obligations. Thus the psychological contract may be regarded as an exchange relation between the employer and the employee. Breaking the psychological contract affects the performance, the morale, and the motivation of the staff in a negative manner. The information presented in this paper is intended to contribute to the theoretical and methodological development of the concept.

  17. Financial Management: Reopening of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Granetto, Paul

    2003-01-01

    .... In anticipation of transitioning to the new contract payment system, the Defense Finance and Accounting Service and the Defense Contract Management Agency were attempting to close out as many contracts as possible...

  18. Practical guide on contract of technology

    International Nuclear Information System (INIS)

    Choi, Chiho

    1991-12-01

    This book gives descriptions of practical guide on contract of technology, which deals with basic of contract like meaning, function term, singing and sealing, contract and stamp tax, common things on contract of research like keeping secret and prevention and treat of dispute, compensation for damages, notice, expiration date of contract and measurement at end of contract, contract of joint research such as meaning and necessity, note at contract, check list at contract, and return of the research product.

  19. Concept of contracting authority

    OpenAIRE

    Kasiliauskaitė, Vitalija

    2016-01-01

    Concept of Contracting Authority Law on Public Procurement the procurement concept implies the conclusion that public procurement be declared only such purchases are carried out by the contracting authority. The contracting authorities can be a subject of state and municipal management institutes, whose assignment authority is determined by a functional approach. Also, contracting authorities may be public and legal entities, but that the public interest and operates non-commercial activities...

  20. Service quality in contracted facilities.

    Science.gov (United States)

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  1. Erich Regener and the ionisation maximum of the atmosphere

    Science.gov (United States)

    Carlson, P.; Watson, A. A.

    2014-12-01

    In the 1930s the German physicist Erich Regener (1881-1955) did important work on the measurement of the rate of production of ionisation deep under water and in the atmosphere. Along with one of his students, Georg Pfotzer, he discovered the altitude at which the production of ionisation in the atmosphere reaches a maximum, often, but misleadingly, called the Pfotzer maximum. Regener was one of the first to estimate the energy density of cosmic rays, an estimate that was used by Baade and Zwicky to bolster their postulate that supernovae might be their source. Yet Regener's name is less recognised by present-day cosmic ray physicists than it should be, largely because in 1937 he was forced to take early retirement by the National Socialists as his wife had Jewish ancestors. In this paper we briefly review his work on cosmic rays and recommend an alternative naming of the ionisation maximum. The influence that Regener had on the field through his son, his son-in-law, his grandsons and his students, and through his links with Rutherford's group in Cambridge, is discussed in an appendix. Regener was nominated for the Nobel Prize in Physics by Schrödinger in 1938. He died in 1955 at the age of 73.

  2. Industrial Services Contracts

    CERN Document Server

    2006-01-01

    This document gives an overview of Industrial Services contracts at CERN, including the probable expenditure in 2006 and the estimated expenditure for 2007. The Finance Committee is invited: - to take note of the revised amount in 2006 for Industrial Services contracts referred to in this document of 138.02 MCHF at 2006 prices compared to the previously anticipated amount of 122.67 MCHF at 2005 prices; - to take note that the estimated amount in 2007 for the contracts referred to in this document will be 112.54 MCHF at 2006 prices; - for the reasons set out in this document, the Finance Committee is also invited to approve the requests for the contracts presented and highlighted in the Annexes.

  3. Association between imagined and actual functional reach (FR): a comparison of young and older adults.

    Science.gov (United States)

    Gabbard, Carl; Cordova, Alberto

    2013-01-01

    Recent studies indicate that the ability to mentally represent action using motor imagery declines with advanced age (>64 years). As the ability to represent action declines, the elderly may experience increasing difficulty with movement planning and execution. Here, we determined the association between estimation of reach via use of motor imagery and actual FR. Young adults (M=22 years) and older adults (M=66 years) estimated reach while standing with targets randomly presented in peripersonal (within actual reach) and extrapersonal (beyond reach) space. Imagined responses were compared to the individual's scaled maximum reach. FR, also while standing, was assessed using the standardized Functional Reach Test (FRT). Results for total score estimation accuracy showed that there was no difference for age; however, results for mean bias and distribution of error revealed that the older group underestimated while the younger group overestimated. In reference to FR, younger adults outperformed older adults (30 versus 14in.) and most prominent, only the younger group showed a significant relationship between estimation and FR. In addition to gaining insight to the effects of advanced age on the ability to mentally represent action and its association with movement execution, these results although preliminary, may have clinical implications based on the question of whether motor imagery training could improve movement estimations and how that might affect actual reach. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  4. Making contracting work better and cost less: Report of the Contract Reform Team

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    In June 1993, Secretary of Energy Hazel O`Leary formed a Contract Reform Team, chaired by Deputy Secretary Bill White, to evaluate the contracting practices of the Department of Energy and to formulate specific proposals for improving those practices. This report summarizes the results of the work of the Contract Reform Team. It recommends actions for implementation that will significantly improve the Department`s contracting practices and will enable the Department to help create a government that -- in the words of Vice President Gore -- {open_quotes}works better and costs less.{close_quotes} These actions and the deadlines for their implementation are listed. Among other things, they recommend replacing the Department`s standard Management and Operating Contract with a new Performance-Based Management Contract and strengthening the Department`s systems for selecting and managing contractors.

  5. Contract Renewal Information - all Contracts

    Data.gov (United States)

    Department of Housing and Urban Development — Multifamily Portfolio datasets (section 8 contracts) - The information has been compiled from multiple data sources within FHA or its contractors. HUD oversees more...

  6. Proposal for the award of an industrial support contract for dismantling LEP cooling and ventilation equipment

    CERN Document Server

    2000-01-01

    This document concerns the award of an Industrial Service contract for dismantling LEP cooling and ventilation equipment. Following a market survey carried out among 68 firms in fourteen Member States, a call for tenders (IT-2658/ST/SL) was sent on 11 February 2000 to 14 firms and one consortium in eight Member States. By the closing date, CERN had received nine tenders from seven firms and two consortia in six Member States. The Finance Committee is invited to agree to the negotiation of a contract with the firm ZVVZ (CZ), the lowest bidder, for a total amount of 822 005 Swiss francs, not subject to revision. The contract will include options for additional dismantling work in the LEP structure, specified in the tender, for a total amount of 313 311 Swiss francs, not subject to revision, bringing the total amount to a maximum of 1 135 316 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CZ-100%.

  7. Employee contract issues for dermatologists.

    Science.gov (United States)

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  8. Bonneville Purchasing Instructions. Appendix 14A, Contracting Officer`s Technical Representatives` Guide for Services Contracts.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1993-07-01

    This guide outlines the duties of BPA personnel designated as Contracting Officers Technical Representatives (COTRs). The BPA Administrator gives contracting officers (COs) in BPA responsibility and authority for awarding and administering contracts. COs are authorized to designate other BPA employees to act as their representatives for purposes of contract administration, from the time of contract award until final receipt and acceptance of the contracted services. COTRs are the individuals primarily relied upon to perform technical contract administration functions. Similar functions for supply and construction contracts are performed by engineering representatives, construction inspectors, and inspectors. Although this Guide is written primarily with the COTR in mind, the concept and operation of teamwork is essential throughout the entire process of contract administration. The CO administers the contract during performance, but rarely has expertise in all of the relevant technical areas. Therefore, CO decisions rely on input from a team. The COTR is an indispensable member of that team. The instructions in this Guide are designed to facilitate this essential CO-COTR cooperation. COTR duties are usually additional to those required of the COTR in his or her assigned line organization. The COTR is still accountable to the line supervisor for performance of regularly-assigned duties. These duties are to be reflected appropriately in performance appraisals and job descriptions. For contract administration duties, however, the COTR reports directly to, and is accountable only to, the CO. The COTR`s supervisor must allow sufficient time to ensure that the COTR can adequately monitor the contract for technical compliance. This Guide is designed for COTRs who are performing service contract (including intergovernmental contract) administration functions as an adjunct to their normal technical duties.

  9. Other enrichment related contracts

    International Nuclear Information System (INIS)

    Hall, J.C.

    1978-01-01

    In addition to long-term enrichment contracts, DOE has other types of contracts: (1) short-term, fixed-commitment enrichment contract; (2) emergency sales agreement for enriched uranium; (3) feed material lease agreement; (4) enriched uranium storage agreement; and (5) feed material usage agreement

  10. 48 CFR 1316.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1316.406 Section 1316.406 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.406 Contract clauses. Insert a clause...

  11. 48 CFR 716.406 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  12. 48 CFR 916.307 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.307 Section 916.307 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 916.307 Contract clauses. (g) Insert the...

  13. 48 CFR 935.071 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 935.071... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.071 Contract clause. The contracting officer must insert the clause at 952.235-71, Research Misconduct, in contracts, including management and operating...

  14. 3 CFR - Government Contracting

    Science.gov (United States)

    2010-01-01

    ... contract oversight could reduce such sums significantly. Government outsourcing for services also raises... a risk that taxpayer funds will be spent on contracts that are wasteful, inefficient, subject to... mission. In such cases, the agency must ensure that the risks associated with noncompetitive contracts are...

  15. Work and minor work contracts

    CERN Document Server

    1999-01-01

    The Work and Minor Work contracts are all of the result-oriented type. The work is specified by CERN and the contractor is given full responsibility for its performance. The contracts are thus very similar to supply contracts. The re-tendering of the existing contracts is almost complete, except for some building maintenance contracts. A new cycle of re-tendering for some activities will be launched in the next twelve months. The total estimated expenditure in the year 2000 for the contracts referred to in this document is 27 750 000 Swiss francs at 1999 prices. The Finance Committee is invited: - to approve the proposed expenditure for the extension of contracts for which the estimated amount for the year 2000 exceeds 750 000 Swiss francs, namely those under references 1, 2, 3, 5, 7, 8, 9 and 23, highlighted in Table I; - to take note that all Work and Minor Work contracts have been tendered since 1 January 1994, except the small contracts shown under references 12 and 16 in Table I; - to take note that the ...

  16. Networks and informal contract law

    NARCIS (Netherlands)

    Tjong Tjin Tai, Eric; Brownsword, Roger; van Gestel, Rob A.J.; Micklitz, Hans-W.

    2017-01-01

    It is often argued that formal contract law cannot treat networks correctly. An analysis of networks in an informal contract law system shows that informal contract law is no panacea. Remaining problems require a different approach to legal regulation and contract practice.

  17. Characteristics of nuclear contracts. Pt. 1

    International Nuclear Information System (INIS)

    Blanchard, R.

    1976-01-01

    While the object of nuclear contracts is specific, these contracts are concluded according to proven techniques based on general regulations on contracts. Following a review of contract classification, they are differentiated according to the nature of the co-contracting parties, the purpose of the contract itself, the procedure for drawing up the contracts, and payment. The operations prior to the contract vary in that they may include a call for tenders, an option for delays or a letter of intent. (NEA) [fr

  18. An Analysis of Army Contract Administration With Regard to Contracting Officers Representatives

    Science.gov (United States)

    2016-09-01

    TO CONTRACTING OFFICER’S REPRESENTATIVES September 2016 By: Tanya V. Peel Angel R. Acevedo Advisors : Karen Landale Matthew Kremer...among contracting personnel and CORs requires improvement, staff levels need to be increased to support contract administration, managers nominate CORs...Landale, Lead Advisor Matthew Kremer, Support Advisor Brad Naegle Academic Associate Graduate School of Business and Public

  19. Adding Concurrency to Smart Contracts

    OpenAIRE

    Dickerson, Thomas; Gazzillo, Paul; Herlihy, Maurice; Koskinen, Eric

    2017-01-01

    Modern cryptocurrency systems, such as Ethereum, permit complex financial transactions through scripts called smart contracts. These smart contracts are executed many, many times, always without real concurrency. First, all smart contracts are serially executed by miners before appending them to the blockchain. Later, those contracts are serially re-executed by validators to verify that the smart contracts were executed correctly by miners. Serial execution limits system throughput and fails ...

  20. 48 CFR 732.111 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111... CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may... Agency-specific indefinite quantity contracts that are a combination of contract types. Rather than using...

  1. Smart contracts sobre Bitcoin

    OpenAIRE

    Andreu Alemany, Josep Miquel

    2016-01-01

    El present treball final de màster realitza una introducció als smart contracts. El treball introdueix el concepte de contracte intel·ligent, els seus usos i alguns exemples existents. Seguidament proporciona les nocions necessàries de les transaccions del protocol Bitcoin per poder implementar un contracte intel·ligent, usant la blockchain que ofereix el protocol. Per últim, s'explica la implementació d'un contracte intel·ligent usant bitcoin: un canal de micropagaments. El presente traba...

  2. A study on the economic use of the CERN contracts

    International Nuclear Information System (INIS)

    Schmied, H.

    1979-01-01

    This investigation attempts to quantify the technical and economic advantage for the producing industries participating in the CERN-contracts, and this in relation to the expenses made by the member countries for CERN. Some 130 European firms were questioned and stated how they appreciated the sale increase and reduced costs achieved as a result of CERN-contracts. This 'economic benefit' amounts to a total of 1,665 million Swiss Francs (up to 1978); the sum of sales with CERN, however, was 394 million Sw. Fr. The benefit/sales figures coefficients for the application spheres cable, magnets, cooling systems, vacuum systems, electronics, and steel lie between 0,9 and 7,3; they even reach 17,3 for computers and 31,6 for precision mechanics. Nearly 80% of the total benefit given refer to sales contracts in market spheres outside high energy and nuclear physics, such as railway, ship-building, cooling systems, power generation, and power distribution. For the 877 million Sw. Fr. which CERN spent for orders to the European industry during the time 1955 to 1973 out of its total budget of 3.500 million Sw. Fr. the benefit is estimated to be appr. 5.000 million Sw. Fr. The report deals closely with the method and the procedure applied in the investigation as well as the quantification and brings some precise cases as examples. (HSI)

  3. Maintenance service contract model for heavy equipment in mining industry using principal agent theory

    Science.gov (United States)

    Pakpahan, Eka K. A.; Iskandar, Bermawi P.

    2015-12-01

    Mining industry is characterized by a high operational revenue, and hence high availability of heavy equipment used in mining industry is a critical factor to ensure the revenue target. To maintain high avaliability of the heavy equipment, the equipment's owner hires an agent to perform maintenance action. Contract is then used to control the relationship between the two parties involved. The traditional contracts such as fixed price, cost plus or penalty based contract studied is unable to push agent's performance to exceed target, and this in turn would lead to a sub-optimal result (revenue). This research deals with designing maintenance contract compensation schemes. The scheme should induce agent to select the highest possible maintenance effort level, thereby pushing agent's performance and achieve maximum utility for both parties involved. Principal agent theory is used as a modeling approach due to its ability to simultaneously modeled owner and agent decision making process. Compensation schemes considered in this research includes fixed price, cost sharing and revenue sharing. The optimal decision is obtained using a numerical method. The results show that if both parties are risk neutral, then there are infinite combination of fixed price, cost sharing and revenue sharing produced the same optimal solution. The combination of fixed price and cost sharing contract results in the optimal solution when the agent is risk averse, while the optimal combination of fixed price and revenue sharing contract is obtained when agent is risk averse. When both parties are risk averse, the optimal compensation scheme is a combination of fixed price, cost sharing and revenue sharing.

  4. Designation of Contracting Officers Representatives and Oversight Framework Could Be Improved for Contracts in Afghanistan

    Science.gov (United States)

    2016-08-30

    Sea Systems issue guidance to contracting officers to obtain a quality assurance surveillance plan for all service contracts, and ensure that the...prepare a quality assurance surveillance plan (QASP) for service contracts in order to facilitate assessment of contractor performance.12 Furthermore...that the contracting activities received and paid for goods or services that did not meet contract performance standards. At the time of the audit

  5. Maximum allowable heat flux for a submerged horizontal tube bundle

    International Nuclear Information System (INIS)

    McEligot, D.M.

    1995-01-01

    For application to industrial heating of large pools by immersed heat exchangers, the socalled maximum allowable (or open-quotes criticalclose quotes) heat flux is studied for unconfined tube bundles aligned horizontally in a pool without forced flow. In general, we are considering boiling after the pool reaches its saturation temperature rather than sub-cooled pool boiling which should occur during early stages of transient operation. A combination of literature review and simple approximate analysis has been used. To date our main conclusion is that estimates of q inch chf are highly uncertain for this configuration

  6. Platelets stimulate fibroblast-mediated contraction of collagen gels

    Directory of Open Access Journals (Sweden)

    Lundahl Joachim

    2003-10-01

    Full Text Available Abstract Background Platelets are thought to play a role in a variety of inflammatory conditions in the lung, some of which may lead to fibrosis. In the current study we tested the hypothesis that whole platelets and platelet lysate can mediate remodelling of extracellular matrix in vitro by affecting fibroblast-mediated contraction of a collagen gel. We also sought to determine to what extent platelet-derived growth factor (PDGF and transforming growth factor-β (TGF-β contribute to this effect. Methods Washed platelets, isolated from healthy blood donors, and platelet lysate (freezing and thawing, were cast together with human lung fibroblasts in three-dimensional collagen gels. The gels were then released and cultured for four days. PDGF and TGF-β1 concentrations were measured in culture supernatants by ELISA. Results Both platelets and platelet lysate augmented fibroblast-mediated gel contraction in a time and concentration dependent manner (19.9% ± 0.1 (mean ± SEM of initial area vs. 48.0% ± 0.4 at 48 hours; P 1 and PDGF-AA/AB were released in co-culture. PDGF-AA/AB had a maximum release at 24 hours whereas TGF-β1 release increased with longer culture periods. Neutralising antibodies to these mediators partially inhibited platelet-induced gel contraction. Conclusion We conclude that platelets may promote remodelling of extracellular matrix in vitro and that PDGF and TGF-β partially mediate this effect, also indicating a role for other mediators. The findings may be an important mechanism in regulating repair processes after injury.

  7. New staff contract policy

    CERN Document Server

    HR Department

    2006-01-01

    Following discussion at TREF and on the recommendation of the Finance Committee, Council approved a new staff contract policy, which became effective on 1 January 2006. Its application is covered by a new Administrative Circular No. 2 (Rev. 3) 'Recruitment, appointment and possible developments regarding the contractual position of staff members'. The revised circular replaces the previous Circulars No. 9 (Rev. 3) 'Staff contracts' and No. 2 (Rev. 2) 'Guidelines and procedures concerning recruitment and probation period for staff members'. The main features of the new contract policy are as follows: The new policy provides chances for long-term employment for all staff recruits staying for four years without distinguishing between those assigned to long-term or short-term activities when joining CERN. In addition, it presents a number of simplifications for the award of ICs. There are henceforth only 2 types of contract: Limited Duration (LD) contracts for all recruitment and Indefinite Contracts (IC) for...

  8. Explaining the contract terms of energy performance contracting in China: The importance of effective financing

    International Nuclear Information System (INIS)

    Li, Yan; Qiu, Yueming; Wang, Yi David

    2014-01-01

    Energy service company (“ESCO”) uses Energy Performance Contracting (“EPC”) to provide energy-saving services to its clients. Under an EPC, both ESCO and the client invest in the energy efficiency measures, according to a negotiated share of investment. Within the length of the contract, the ESCO and its client divide up the saved energy bill according to a negotiated share. Once the contract expires, the client claims all of the saved energy bills if the energy efficiency measures still last. Different EPC projects have different contract terms, including total investment, share of investment and length of contract. These contract terms directly determine the resulted energy savings. Thus it is essential and important to look at how these contract terms are formed and what are the major influencing factors. This paper first builds a theoretical bargain model between ESCO and its client to find out the structural relationship among these contract terms. Then, using the information of about 140 EPC contracts in China in 2010 and 2011, the paper empirically estimates the impacts of various factors on the contract terms and the resulted energy savings. We find that cost of capitals for ESCOs and the clients, especially for ESCOs, is a major factor influencing contract terms and the resulted energy savings. Thus providing effective financing is critical for the development of EPC in China. - Highlights: • We build a theoretical bargain model between an ESCO and its client. • We empirically quantify the impacts of various factors on EPC contract terms. • Cost of capital is a key factor determining EPC contract terms. • Providing effective financing, especially for ESCOs is important

  9. Inactivation of Parietal Reach Region Affects Reaching But Not Saccade Choices in Internally Guided Decisions.

    Science.gov (United States)

    Christopoulos, Vassilios N; Bonaiuto, James; Kagan, Igor; Andersen, Richard A

    2015-08-19

    The posterior parietal cortex (PPC) has traditionally been considered important for awareness, spatial perception, and attention. However, recent findings provide evidence that the PPC also encodes information important for making decisions. These findings have initiated a running argument of whether the PPC is critically involved in decision making. To examine this issue, we reversibly inactivated the parietal reach region (PRR), the area of the PPC that is specialized for reaching movements, while two monkeys performed a memory-guided reaching or saccade task. The task included choices between two equally rewarded targets presented simultaneously in opposite visual fields. Free-choice trials were interleaved with instructed trials, in which a single cue presented in the peripheral visual field defined the reach and saccade target unequivocally. We found that PRR inactivation led to a strong reduction of contralesional choices, but only for reaches. On the other hand, saccade choices were not affected by PRR inactivation. Importantly, reaching and saccade movements to single instructed targets remained largely intact. These results cannot be explained as an effector-nonspecific deficit in spatial attention or awareness, since the temporary "lesion" had an impact only on reach choices. Hence, the PPR is a part of a network for reach decisions and not just reach planning. There has been an ongoing debate on whether the posterior parietal cortex (PPC) represents only spatial awareness, perception, and attention or whether it is also involved in decision making for actions. In this study we explore whether the parietal reach region (PRR), the region of the PPC that is specialized for reaches, is involved in the decision process. We inactivated the PRR while two monkeys performed reach and saccade choices between two targets presented simultaneously in both hemifields. We found that inactivation affected only the reach choices, while leaving saccade choices intact

  10. Computation and Evaluation of Features of Surface Electromyogram to Identify the Force of Muscle Contraction and Muscle Fatigue

    Directory of Open Access Journals (Sweden)

    Sridhar P. Arjunan

    2014-01-01

    Full Text Available The relationship between force of muscle contraction and muscle fatigue with six different features of surface electromyogram (sEMG was determined by conducting experiments on thirty-five volunteers. The participants performed isometric contractions at 50%, 75%, and 100% of their maximum voluntary contraction (MVC. Six features were considered in this study: normalised spectral index (NSM5, median frequency, root mean square, waveform length, normalised root mean square (NRMS, and increase in synchronization (IIS index. Analysis of variance (ANOVA and linear regression analysis were performed to determine the significance of the feature with respect to the three factors: muscle force, muscle fatigue, and subject. The results show that IIS index of sEMG had the highest correlation with muscle fatigue and the relationship was statistically significant (P0.05.

  11. Computation and evaluation of features of surface electromyogram to identify the force of muscle contraction and muscle fatigue.

    Science.gov (United States)

    Arjunan, Sridhar P; Kumar, Dinesh K; Naik, Ganesh

    2014-01-01

    The relationship between force of muscle contraction and muscle fatigue with six different features of surface electromyogram (sEMG) was determined by conducting experiments on thirty-five volunteers. The participants performed isometric contractions at 50%, 75%, and 100% of their maximum voluntary contraction (MVC). Six features were considered in this study: normalised spectral index (NSM5), median frequency, root mean square, waveform length, normalised root mean square (NRMS), and increase in synchronization (IIS) index. Analysis of variance (ANOVA) and linear regression analysis were performed to determine the significance of the feature with respect to the three factors: muscle force, muscle fatigue, and subject. The results show that IIS index of sEMG had the highest correlation with muscle fatigue and the relationship was statistically significant (P 0.05).

  12. Automatic Conflict Detection on Contracts

    Science.gov (United States)

    Fenech, Stephen; Pace, Gordon J.; Schneider, Gerardo

    Many software applications are based on collaborating, yet competing, agents or virtual organisations exchanging services. Contracts, expressing obligations, permissions and prohibitions of the different actors, can be used to protect the interests of the organisations engaged in such service exchange. However, the potentially dynamic composition of services with different contracts, and the combination of service contracts with local contracts can give rise to unexpected conflicts, exposing the need for automatic techniques for contract analysis. In this paper we look at automatic analysis techniques for contracts written in the contract language mathcal{CL}. We present a trace semantics of mathcal{CL} suitable for conflict analysis, and a decision procedure for detecting conflicts (together with its proof of soundness, completeness and termination). We also discuss its implementation and look into the applications of the contract analysis approach we present. These techniques are applied to a small case study of an airline check-in desk.

  13. Contracting for Public Services

    DEFF Research Database (Denmark)

    Greve, Carsten

    strategic purchasing understanding markets communicating the contracting decision designing and drafting the contract the role of the consumer the regulation of service provision Illustrated throughout with practitioner case-studies from a range of OECD countries, this book presents an important new......Insightful and comprehensive and covering new subjects like globalization and IT, this text, international in its approach, provides a thorough introduction to the key phases of the contracting process and the skills required by managers in its implementation. These include: policy for contracting...

  14. Contract law as fairness

    NARCIS (Netherlands)

    Klijnsma, J.

    2015-01-01

    This article examines the implications for contract law of Rawls' theory of justice as fairness. It argues that contract law as an institution is part of the basic structure of society and as such subject to the principles of justice. Discussing the basic structure in relation to contract law is

  15. Time to reach tacrolimus maximum blood concentration,mean residence time, and acute renal allograft rejection: an open-label, prospective, pharmacokinetic study in adult recipients.

    Science.gov (United States)

    Kuypers, Dirk R J; Vanrenterghem, Yves

    2004-11-01

    The aims of this study were to determine whether disposition-related pharmacokinetic parameters such as T(max) and mean residence time (MRT) could be used as predictors of clinical efficacy of tacrolimus in renal transplant recipients, and to what extent these parameters would be influenced by clinical variables. We previously demonstrated, in a prospective pharmacokinetic study in de novo renal allograft recipients, that patients who experienced early acute rejection did not differ from patients free from rejection in terms of tacrolimus pharmacokinetic exposure parameters (dose interval AUC, preadministration trough blood concentration, C(max), dose). However, recipients with acute rejection reached mean (SD) tacrolimus T(max) significantly faster than those who were free from rejection (0.96 [0.56] hour vs 1.77 [1.06] hours; P clearance nor T(1/2) could explain this unusual finding, we used data from the previous study to calculate MRT from the concentration-time curves. As part of the previous study, 100 patients (59 male, 41 female; mean [SD] age, 51.4 [13.8] years;age range, 20-75 years) were enrolled in the study The calculated MRT was significantly shorter in recipients with acute allograft rejection (11.32 [031] hours vs 11.52 [028] hours; P = 0.02), just like T(max) was an independent risk factor for acute rejection in a multivariate logistic regression model (odds ratio, 0.092 [95% CI, 0.014-0.629]; P = 0.01). Analyzing the impact of demographic, transplantation-related, and biochemical variables on MRT, we found that increasing serum albumin and hematocrit concentrations were associated with a prolonged MRT (P calculated MRT were associated with a higher incidence of early acute graft rejection. These findings suggest that a shorter transit time of tacrolimus in certain tissue compartments, rather than failure to obtain a maximum absolute tacrolimus blood concentration, might lead to inadequate immunosuppression early after transplantation.

  16. Contractibility of curves

    Directory of Open Access Journals (Sweden)

    Janusz Charatonik

    1991-11-01

    Full Text Available Results concerning contractibility of curves (equivalently: of dendroids are collected and discussed in the paper. Interrelations tetween various conditions which are either sufficient or necessary for a curve to be contractible are studied.

  17. Analysis of Muscle Contraction on Pottery Manufacturing Process Using Electromyography (EMG)

    Science.gov (United States)

    Soewardi, Hartomo; Azka Rahmayani, Amalia

    2016-01-01

    One of the most common problems in pottery manufacturing process is musculoskeletal disorders on workers. This disorder was caused by uncomfortable posture where the workers sit on the floor with one leg was folded and another was twisted for long duration. Back, waist, buttock, and right knee frequently experience the disorders. The objective of this research is to investigate the muscle contraction at such body part of workers in manufacturing process of pottery. Electromyography is used to investigate the muscle contraction based on the median frequency signal. Focus measurements is conducted on four muscles types. They are lower interscapular muscle on the right and left side, dorsal lumbar muscle, and lateral hamstring muscle. Statistical analysis is conducted to test differences of muscle contraction between female and male. The result of this research showed that the muscle which reached the highest contraction is dorsal lumbar muscle with the average of median frequency is 51,84 Hz. Then followed by lower interscapular muscle on the left side with the average of median frequency is 31,30 hz, lower interscapular muscle on the right side average of median frequency is 31,24 Hz, and lateral hamstring muscle average of median frequency is 21,77 Hz. Based on the statistic analysis result, there were no differences between male and female on left and right lower interscapular muscle and dorsal lumbar muscle but there were differences on lateral hamstring muscle with the significance level is 5%. Besides that, there were differences for all combination muscle types with the level of significance is 5%.

  18. Calculation of contraction stresses in dental composites by analysis of crack propagation in the matrix surrounding a cavity.

    Science.gov (United States)

    Yamamoto, Takatsugu; Ferracane, Jack L; Sakaguchi, Ronald L; Swain, Michael V

    2009-04-01

    Polymerization contraction of dental composite produces a stress field in the bonded surrounding substrate that may be capable of propagating cracks from pre-existing flaws. The objectives of this study were to assess the extent of crack propagation from flaws in the surrounding ceramic substrate caused by composite contraction stresses, and to propose a method to calculate the contraction stress in the ceramic using indentation fracture. Initial cracks were introduced with a Vickers indenter near a cylindrical hole drilled into a glass-ceramic simulating enamel. Lengths of the radial indentation cracks were measured. Three composites having different contraction stresses were cured within the hole using one- or two-step light-activation methods and the crack lengths were measured. The contraction stress in the ceramic was calculated from the crack length and the fracture toughness of the glass-ceramic. Interfacial gaps between the composite and the ceramic were expressed as the ratio of the gap length to the hole perimeter, as well as the maximum gap width. All groups revealed crack propagation and the formation of contraction gaps. The calculated contraction stresses ranged from 4.2 MPa to 7.0 MPa. There was no correlation between the stress values and the contraction gaps. This method for calculating the stresses produced by composites is a relatively simple technique requiring a conventional hardness tester. The method can investigate two clinical phenomena that may occur during the placement of composite restorations, i.e. simulated enamel cracking near the margins and the formation of contraction gaps.

  19. Study of impacts of physical contracts and financial contracts on bidding strategies of GENCOs

    International Nuclear Information System (INIS)

    Xiaoling Chen; He, Y.; Song, Y.H.

    2004-01-01

    This paper studies the impacts of physical contracts and financial contracts on the bidding strategies of GENCOs, including Physical Bilateral Contracts, Contracts for Difference (CfDs), Call Options and Put Options under discriminatory pricing mechanism. The integrated bidding decision model is applied, which has three main modules - probabilistic local marginal price simulator, market-oriented unit commitment model and multi-criteria decision system. The numerical results show that the GENCO will choose different bidding strategies if it holds different types of contract. The results also suggest that CfDs have the best performance for risk alleviation. (author)

  20. Agonist contraction during intermittent theta burst stimulation enhances motor cortical plasticity of the wrist flexors.

    Science.gov (United States)

    Mirdamadi, J L; Suzuki, L Y; Meehan, S K

    2015-03-30

    Differences in cortical control across the different muscles of the upper limb may mitigate the efficacy of TMS interventions targeting a specific muscle. The current study sought to determine whether weak concurrent contraction during TMS could enhance the efficacy of intermittent theta burst stimulation (iTBS) in the forearm flexors. Motor evoked potentials (MEP) were elicited from the flexor (FCR) and extensor carpi radialis (ECR) motor cortical hotspots before and after iTBS over the FCR cortical hotspot. During iTBS the FCR was either relaxed (iTBS-Relax) or tonically contracted to 10% of maximum voluntary force (iTBS-Contract). iTBS-Relax failed to produce consistent potentiation of MEPFCR amplitude. Individuals with a relatively lower RMTFCR compared RMTECR demonstrated MEPFCR facilitation post-iTBS-Relax. Individuals with relatively higher RMTFCR demonstrated less facilitation and even suppression of MEPFCR amplitude. iTBS-Contract facilitated MEPFCR amplitude but only for MEPFCR evoked from the ECR hotspot. Interactions between overlapping cortical representations determine the efficacy of iTBS. Tonic contraction increases the efficacy of iTBS by enhancing the volume of the cortical representation. However, metaplastic effects may attenuate the enhancement of MEP gain at the motor cortical hotspot. The use of TMS as an adjunct to physical therapy should account for inter-muscle interactions when targeting muscles of the forearm. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  1. Analysis of foreign petroleum contracts

    International Nuclear Information System (INIS)

    Moran, S.S.

    1991-01-01

    Most foreign exploration and production contracts are of two basic types: Production-Sharing contracts in which a portion of oil revenues, 'cost oil,' is available to the contractor for recoupment of exploration and production costs with the remainder, 'profit oil,' being shared according to an agreed-upon formula, and the familiar Tax-Royalty contract in which a share of petroleum revenues goes to the host country 'off the top' as royalties, and operating profits are taxed at the going rate. Bottom line splits of profits between host governments and contractors, which are approximately 50-50 in the United States, are typically in the 60-40 to 85-15 range elsewhere, with lower profit shares being offset by the higher volume potential and lower costs that may be associated with less mature exploration areas. Foreign contract qualities can be grossly compared by walking typical field models through the contracts to arrive at the bottom line profit splits. Variations within the contract forms include government participation, sliding scale contract elements, special taxes related to rates of return, etc. Often, contract terms are subject to negotiation and the tradeoffs between contract elements must be understood. Contract life, amortization schedules, fund repatriation, currency exchange rates, and the interaction of foreign and United States tax regimens are among the other factors that must be considered. Final decisions on foreign ventures must combine consideration of contracts, economic projections, hydrocarbon volumes, exploration cost estimates, and the estimated probability of success into an overall project assessment

  2. Drilling contracts and incentives

    International Nuclear Information System (INIS)

    Osmundsen, Petter; Sorenes, Terje; Toft, Anders

    2008-01-01

    Shortages of rigs and personnel have encouraged discussion of designing incentive contracts in the drilling sector. However, for the drilling contracts, there are not a large variety of contract types in use. This article describes and analyses incentives for drilling contractors. These are directly represented by the compensation formats utilised in the present and in the consecutive drilling contracts. Indirectly, incentives are also provided by the evaluation criteria that oil companies use for awarding drilling assignments. Changes in contract format pose a number of relevant questions relating to resource management, and the article takes an in-depth look at some of these. Do evaluation criteria for awarding drilling assignments encourage the development of new technology and solutions? How will a stronger focus on drilling efficiency influence reservoir utilisation?

  3. An unsatisfactory contract policy

    CERN Multimedia

    Association du personnel

    2012-01-01

    For the last 15 years contract policy has been one of the top priorities of CERN staff, as expressed in successive surveys initiated by the Staff Association. In one’s professional life, having some forward vision of one’s career prospects is the key to loyalty and motivation. On the contrary, instability about the future is always at the root of anxiety, conflicts, or even health problems. A good employer must therefore balance the needs of the Company and those of its employees. CERN’s current contract policy, as described in the Administrative Circular No 2, states that staff members should first obtain a limited duration (LD) contract of up to five years. Then, if they want to stay in the Organization, staff members must apply, usually once a year, and before the end of their LD contract, for an indefinite contract (IC) post. All candidates for an IC post are considered by the Review Board for the award of indefinite contracts (Review Board) which will choose the most suita...

  4. Viewer-centered and body-centered frames of reference in direct visuomotor transformations.

    Science.gov (United States)

    Carrozzo, M; McIntyre, J; Zago, M; Lacquaniti, F

    1999-11-01

    It has been hypothesized that the end-point position of reaching may be specified in an egocentric frame of reference. In most previous studies, however, reaching was toward a memorized target, rather than an actual target. Thus, the role played by sensorimotor transformation could not be disassociated from the role played by storage in short-term memory. In the present study the direct process of sensorimotor transformation was investigated in reaching toward continuously visible targets that need not be stored in memory. A virtual reality system was used to present visual targets in different three-dimensional (3D) locations in two different tasks, one with visual feedback of the hand and arm position (Seen Hand) and the other without such feedback (Unseen Hand). In the Seen Hand task, the axes of maximum variability and of maximum contraction converge toward the mid-point between the eyes. In the Unseen Hand task only the maximum contraction correlates with the sight-line and the axes of maximum variability are not viewer-centered but rotate anti-clockwise around the body and the effector arm during the move from the right to the left workspace. The bulk of findings from these and previous experiments support the hypothesis of a two-stage process, with a gradual transformation from viewer-centered to body-centered and arm-centered coordinates. Retinal, extra-retinal and arm-related signals appear to be progressively combined in superior and inferior parietal areas, giving rise to egocentric representations of the end-point position of reaching.

  5. Ontologies for commitment-based smart contracts

    NARCIS (Netherlands)

    de Kruijff, Joost; Weigand, Hans; Panetto, H; Debruyne, C.; Gaaloul, W.; Papazoglou, M.; Paschke, A.; Ardagna, C.A.; Meersman, R.

    2017-01-01

    Smart contracts gain rapid exposure since the inception of blockchain technology. Yet there is no unified ontology for smart contracts. Being categorized as coded contracts or substitutes of conventional legal contracts, there is a need to reduce the conceptual ambiguity of smart contracts. We

  6. 48 CFR 46.314 - Transportation contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  7. Contracting for nuclear fuels

    International Nuclear Information System (INIS)

    Schuessler, C.M.

    1981-10-01

    This paper deals with uranium sales contracts, i.e. with contractual arrangements in the first steps of the fuel cycle, which cover uranium production and conversion. The various types of contract are described and, where appropriate, their underlying business philosophy and their main terms and conditions. Finally, the specific common features of such contracts are reviewed. (NEA) [fr

  8. Towards Certified Management of Financial Contracts

    DEFF Research Database (Denmark)

    Bahr, Patrick; Berthold, Jost; Elsman, Martin

    2014-01-01

    . The seminal work by Peyton-Jones and Eber on financial contracts shows how an algebraic approach to contract specification can be used for valuation of contracts (when combined with a model of the underlying observables) and for managing how contracts evolve under so-called fixings and decision......-taking, with the contracts eventually evaporating into the empty contract, for which no party have further obligations. The ideas have emerged into Eber's company LexiFi, which has become a leading software provider for a range of financial institutions, with all contract management operations centralised around a domain......Banks and financial institutions nowadays often use domain-specific languages (DSLs) for describing complex financial contracts, in particular, for specifying how asset transfers for a specific contract depend on underlying observables, such as interest rates, currency rates, and stock prices...

  9. Adjustments differ among low-threshold motor units during intermittent, isometric contractions.

    Science.gov (United States)

    Farina, Dario; Holobar, Ales; Gazzoni, Marco; Zazula, Damjan; Merletti, Roberto; Enoka, Roger M

    2009-01-01

    We investigated the changes in muscle fiber conduction velocity, recruitment and derecruitment thresholds, and discharge rate of low-threshold motor units during a series of ramp contractions. The aim was to compare the adjustments in motor unit activity relative to the duration that each motor unit was active during the task. Multichannel surface electromyographic (EMG) signals were recorded from the abductor pollicis brevis muscle of eight healthy men during 12-s contractions (n = 25) in which the force increased and decreased linearly from 0 to 10% of the maximum. The maximal force exhibited a modest decline (8.5 +/- 9.3%; P motor units that were active for 16-98% of the time during the first five contractions were identified throughout the task by decomposition of the EMG signals. Action potential conduction velocity decreased during the task by a greater amount for motor units that were initially active for >70% of the time compared with that of less active motor units. Moreover, recruitment and derecruitment thresholds increased for these most active motor units, whereas the thresholds decreased for the less active motor units. Another 18 motor units were recruited at an average of 171 +/- 32 s after the beginning of the task. The recruitment and derecruitment thresholds of these units decreased during the task, but muscle fiber conduction velocity did not change. These results indicate that low-threshold motor units exhibit individual adjustments in muscle fiber conduction velocity and motor neuron activation that depended on the relative duration of activity during intermittent contractions.

  10. Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-01-01

    This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

  11. Approximate maximum parsimony and ancestral maximum likelihood.

    Science.gov (United States)

    Alon, Noga; Chor, Benny; Pardi, Fabio; Rapoport, Anat

    2010-01-01

    We explore the maximum parsimony (MP) and ancestral maximum likelihood (AML) criteria in phylogenetic tree reconstruction. Both problems are NP-hard, so we seek approximate solutions. We formulate the two problems as Steiner tree problems under appropriate distances. The gist of our approach is the succinct characterization of Steiner trees for a small number of leaves for the two distances. This enables the use of known Steiner tree approximation algorithms. The approach leads to a 16/9 approximation ratio for AML and asymptotically to a 1.55 approximation ratio for MP.

  12. 7 CFR 631.14 - Contract violations.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE LONG TERM CONTRACTING GREAT PLAINS CONSERVATION PROGRAM Contracts § 631.14 Contract violations. Contract violations, determinations and appeals will be handled in accordance with the terms of the... 7 Agriculture 6 2010-01-01 2010-01-01 false Contract violations. 631.14 Section 631.14 Agriculture...

  13. 77 FR 3288 - International Mail Contract

    Science.gov (United States)

    2012-01-23

    ... as the baseline contract for future functional equivalence analyses of the GREP Contracts 1 product... Classification Schedule language for GREP Contracts 1. The Postal Service identifies general contract terms that... methodology, the relevant characteristics of this GREP contract are similar, if not the same, as the relevant...

  14. 48 CFR 837.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 837.403... OF CONTRACTING SERVICE CONTRACTING Nonpersonal Health Care Services 837.403 Contract clause. The contracting officer shall insert the clause at 852.237-7, Indemnification and medical liability insurance, in...

  15. 48 CFR 811.503 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.503... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Liquidated Damages 811.503 Contract clause. When the contracting... contracting officer must include the clause in 852.211-74, Liquidated damages, in the contract. ...

  16. Maximum discharge rate of liquid-vapor mixtures from vessels

    International Nuclear Information System (INIS)

    Moody, F.J.

    1975-09-01

    A discrepancy exists in theoretical predictions of the two-phase equilibrium discharge rate from pipes attached to vessels. Theory which predicts critical flow data in terms of pipe exit pressure and quality severely overpredicts flow rates in terms of vessel fluid properties. This study shows that the discrepancy is explained by the flow pattern. Due to decompression and flashing as fluid accelerates into the pipe entrance, the maximum discharge rate from a vessel is limited by choking of a homogeneous bubbly mixture. The mixture tends toward a slip flow pattern as it travels through the pipe, finally reaching a different choked condition at the pipe exit

  17. Endogenous Market Structures and Contract Theory. Delegation, principal-agent contracts, screening, franchising and tying

    OpenAIRE

    Etro Federico

    2010-01-01

    I study the role of unilateral strategic contracts for firms active in markets with price competition and endogenous entry. Traditional results change substantially when the market structure is endogenous rather than exogenous. They concern 1) contracts of managerial delegation to non-profit maximizers, 2) incentive principal-agent contracts in the presence of moral hazard on cost reducing activities, 3) screening contracts in case of asymmetric information on the productivity of the managers...

  18. Voluntary drive-dependent changes in vastus lateralis motor unit firing rates during a sustained isometric contraction at 50% of maximum knee extension force.

    NARCIS (Netherlands)

    de Ruiter, C.J.; Elzinga, M.J.; Verdijk, PW; van Mechelen, W.; de Haan, A.

    2004-01-01

    The purpose of the present study was to relate the expected inter-subject variability in voluntary drive of the knee extensor muscles during a sustained isometric contraction to the changes in firing rates of single motor units. Voluntary activation, as established with super-imposed electrical

  19. BOT Outsourcing Contracts

    DEFF Research Database (Denmark)

    Ørberg Jensen, Peter D.; Petersen, Bent

    2012-01-01

    Build-operate-transfer (BOT) contracting has been widely usen in the engineering and construction industry, but has only recently been introduced in services industry domains. Notably, service provider firms from emerging markets have recently started offering BOT outsourcing contracts. In this p...

  20. Comparing contracting performance

    DEFF Research Database (Denmark)

    Lindholst, Andrej Christian

    . Hypotheses are suggested for the role of culture, competition, contracts, capabilities and collaboration for contracting performance between and across the countries. Arguments are tested against data from on four comparable national surveys of private delivery of park and road maintenance services in local...

  1. 48 CFR 926.7104 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 926.7104... 1993. 926.7104 Contract clause. The contracting officer shall insert the clause at 48 CFR (DEAR) 952.226-74, Displaced Employee Hiring Preference, in contracts (except for contracts for commercial items...

  2. 48 CFR 822.305 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 822.305... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Contract Work Hours and Safety Standards Act 822.305 Contract clause. The contracting officer shall insert the clause at 852.222-70, Contract Work...

  3. 48 CFR 52.222-51 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-51 Exemption from Application of the Service Contract Act to Contracts for Maintenance... clause: Exemption From Application of the Service Contract Act to Contracts for Maintenance, Calibration...

  4. 48 CFR 52.222-48 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance... following provision: Exemption From Application of the Service Contract Act to Contracts for Maintenance...

  5. Reach Address Database (RAD)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Reach Address Database (RAD) stores the reach address of each Water Program feature that has been linked to the underlying surface water features (streams,...

  6. 24 CFR 891.560 - HAP contract.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  7. Pacta sunt servanda versus the social role of contracts: the case of Brazilian agriculture contracts

    Directory of Open Access Journals (Sweden)

    Christiane Leles Rezende

    2012-06-01

    Full Text Available This study explores the instability created by contradictory court decisions related with contract breaches. Forward marketing contracts represent an important source of resources to finance Brazilian agriculture, however a large number of contract breaches were observed during a period of marked increase in soy prices. The study analyzed 161 judicial appeal decisions and a survey was carried with 70 farmers. The results show the difference of judges' interpretation and the existence of second order effects. The effects of court decisions were more requirements of guarantees and the reduction in the number of contracts. Those soybean farmers who did not breach their contracts have also been negatively affected by the strategic reactions of trading and processing companies. The concept of "social function of the contract" introduced in Brazilian civil code led to a higher degree of instability in contracts, raising transaction costs and motivating private economic sanctions.

  8. nth roots of normal contractions

    International Nuclear Information System (INIS)

    Duggal, B.P.

    1992-07-01

    Given a complex separable Hilbert space H and a contraction A on H such that A n , n≥2 some integer, is normal it is shown that if the defect operator D A = (1 - A * A) 1/2 is of the Hilbert-Schmidt class, then A is similar to a normal contraction, either A or A 2 is normal, and if A 2 is normal (but A is not) then there is a normal contraction N and a positive definite contraction P of trace class such that parallel to A - N parallel to 1 = 1/2 parallel to P + P parallel to 1 (where parallel to · parallel to 1 denotes the trace norm). If T is a compact contraction such that its characteristics function admits a scalar factor, if T = A n for some integer n≥2 and contraction A with simple eigen-values, and if both T and A satisfy a ''reductive property'', then A is a compact normal contraction. (author). 16 refs

  9. 48 CFR 52.222-52 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Certification. 52.222-52 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Certification. As... Contract Act to Contracts for Certain Services—Certification (NOV 2007) (a) The offeror shall check the...

  10. 48 CFR 52.222-53 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Science.gov (United States)

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Requirements. 52.222-53 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Requirements. As... Act to Contracts for Certain Services—Requirements (FEB 2009) (a) The services under this contract are...

  11. Bottlenecks and contracts

    International Nuclear Information System (INIS)

    2001-01-01

    The report surveys the central points in the literature about contracts on geographical price differences and transmission rights in the power market. It is commonly believed that such contracts may reduce market power and contribute to better network investments. The theoretical debate is in part unfinished and largely based on very stylised assumptions. There is some indication that such contracts may not be very useful in practice. But they may be useful in some cases, perhaps in particular when power is transported outside limited surplus areas and for certain investment decisions where there is no systems operator with a natural responsibility

  12. Electromyographic activity of beating and reaching during simulated boardsailing.

    Science.gov (United States)

    Buchanan, M; Cunningham, P; Dyson, R J; Hurrion, P D

    1996-04-01

    This study examined the responses of six competitive boardsailors (three males, three females) during laboratory-based simulation tasks while the electromyographic activity of up to 13 muscles was recorded. A sailboard, mounted in a steel frame and resting on a waterbed, allowed simulation of roll and pitch movements. Wind force was simulated by attaching the boom to a weight stack with a hydraulically controlled buffered release phase. The progression of the simulation test was controlled by the sailor copying movements on an edited video of each subject boardsailing on the open water. Analysis of individual pumping movements for mean peak percentage of maximal enveloped voluntary contraction (%MEVC) in 'beating' and 'reaching' showed that muscular activity in the arm (flexor carpi ulnaris, extensor carpi radialis and biceps brachii) was greatest (66-94% MEVC), with considerable activity (58-75% MEVC) in the deltoid and trapezius shoulder muscles, but much less activity in the leg muscles (16-40% MEVC). For the combined upper and lower body muscles there was a significant difference (P reflecting the current dynamic nature of the sport.

  13. Can fast-twitch muscle fibres be selectively recruited during lengthening contractions? Review and applications to sport movements.

    Science.gov (United States)

    Chalmers, Gordon R

    2008-01-01

    Literature examining the recruitment order of motor units during lengthening (eccentric) contractions was reviewed to determine if fast-twitch motor units can be active while lower threshold slow-twitch motor units are not active. Studies utilizing surface electromyogram (EMG) amplitude, single motor unit activity, spike amplitude-frequency analyses, EMG power spectrum, mechanomyographic, and phosphocreatine-to-creatine ratio (PCr/Cr) techniques were reviewed. Only single motor unit and PCr/Cr data were found to be suitable to address the goals of this review. Nine of ten single motor unit studies, examining joint movement velocities up to 225 degrees/s and forces up to 53% of a maximum voluntary contraction, found that the size principle of motor unit recruitment applied during lengthening contractions. Deviation from the size principle was demonstrated by one study examining movements within a small range of low velocities and modest forces, although other studies examining similar low forces and lengthening velocities reported size-ordered recruitment. The PCr/Cr data demonstrated the activation of all fibre types in lengthening maximal contractions. Most evidence indicates that for lengthening contractions of a wide range of efforts and speeds, fast-twitch muscle fibres cannot be selectively recruited without activity of the slow-twitch fibres of the same muscle.

  14. Dynamic model of the octopus arm. II. Control of reaching movements.

    Science.gov (United States)

    Yekutieli, Yoram; Sagiv-Zohar, Roni; Hochner, Binyamin; Flash, Tamar

    2005-08-01

    The dynamic model of the octopus arm described in the first paper of this 2-part series was used here to investigate the neural strategies used for controlling the reaching movements of the octopus arm. These are stereotypical extension movements used to reach toward an object. In the dynamic model, sending a simple propagating neural activation signal to contract all muscles along the arm produced an arm extension with kinematic properties similar to those of natural movements. Control of only 2 parameters fully specified the extension movement: the amplitude of the activation signal (leading to the generation of muscle force) and the activation traveling time (the time the activation wave takes to travel along the arm). We found that the same kinematics could be achieved by applying activation signals with different activation amplitudes all exceeding some minimal level. This suggests that the octopus arm could use minimal amplitudes of activation to generate the minimal muscle forces required for the production of the desired kinematics. Larger-amplitude signals would generate larger forces that increase the arm's stability against perturbations without changing the kinematic characteristics. The robustness of this phenomenon was demonstrated by examining activation signals with either a constant or a bell-shaped velocity profile. Our modeling suggests that the octopus arm biomechanics may allow independent control of kinematics and resistance to perturbation during arm extension movements.

  15. Quantification of contraction synchronicity and contraction work in coronary artery disease

    Energy Technology Data Exchange (ETDEWEB)

    Niimi, Takanaga; Nanasato, Mamoru [Nagoya Daini Red Cross Hospital, Nagoya (Japan); Maeda, Hisatoshi [Dept. of Radiological Technology, Nagoya University School of Health Sciences, Nagoya(Japan)

    2017-09-15

    This study quantified the contraction synchronicity (CS; with 100% representing full synchrony and −100% dyssynchrony) and contraction work (CW, millijoules per centimeter squared; representing myocardial area) in patients with reduced left ventricular ejection fraction (LVEF) associated with coronary artery disease (CAD)

  16. Temporary labour contracts

    CERN Document Server

    2001-01-01

    At its September 2000 meeting, the Finance Committee approved a second one-year extension of the four existing temporary labour contracts (L020/PE, L021/PE, L022/PE, L023/PE) until 31 December 2001 for a total amount not exceeding 6 000 000 Swiss francs at 2000 prices. The Finance Committee is invited: - to take note that the estimated annual expenditure on temporary labour in 2001 will amount to approximately 4 500 000 Swiss francs against the previously estimated 6 000 000 Swiss francs; - to approve the extension of the four existing contracts by six months to 30 June 2002 for an overall amount not exceeding 1 500 000 Swiss francs; - to take note that new contracts for the Swiss part of the CERN site will be submitted for adjudication in December 2001 and that new contracts for the French part of the CERN site will be submitted for adjudication in the course of 2002.

  17. The Contracting Parties' Ability To Conclude The Employment Contract

    Directory of Open Access Journals (Sweden)

    Carmen Constantina NENU

    2014-08-01

    Full Text Available This study's main objective is to analyze certain effects produced by the changes of the Labor Code and by the entry into force of the current Romanian Civil Code. These effects refer to one of the fundamental conditions for the valid conclusion of the individual employment contract, that is, to the legal capacity of employers and employees. Thus, a complete analysis of legal regulations and of the correlations between different provisions on the legal capacity of parties to the individual employment contract is required to identify the existing noncompliance and to propose solutions. The research demonstrated that the current regulatory framework governing the legal capacity of the parties to an individual employment contract does not entirely correspond to the social reality. Therefore, only the employer benefits from a relatively comprehensive statutory regulation on the legal capacity to conclude an individual employment contract. The employee, however, does not benefit from the same attention from legislature. Considering the above, the study represents a significant scientific contribution, whose value lies in the proposed changes to modify legislature, so that the legal capacity of job holders would benefit from fair regulation, in accordance with the principle of legal protection of employee rights.

  18. On the rate of return and risk factors to international oil companies in Iran's buy-back service contracts

    International Nuclear Information System (INIS)

    Ghandi, Abbas; Lin Lawell, C.-Y. Cynthia

    2017-01-01

    We analyze the rate of return (ROR) and risk factors faced by Shell Exploration, an international oil company (IOC), in its Soroosh and Nowrooz buy-back service contract in Iran. In particular, based on our models of cash flow, we analyze the buy-back contract specific risk factors that can contribute to a reduction in the rate of return for the international oil company. Our cash flow models resemble the cash flow of buy-back service contracts before the Iranian government changed the way it determined the capital cost ceiling and pre-defined the oil price in these contracts in 2008–2009. Our actual and contractual cash flow models reveal that Shell Exploration's actual ROR was much lower than the contractual level. Furthermore, we find that among the risk factors that we considered, a capital cost overrun has the greatest negative effect on the IOC's ROR. Moreover, we show that there is a potential for modifying the contracts in order for the IOC to face an actual ROR closer to the contractual ROR even if the contract faces cost overrun or delay, without exceeding the maximum contractual ROR that the National Iranian Oil Company is willing to give. - Highlights: • Buy-back contract specific risk factors can reduce the rate of return. • Shell Exploration's actual ROR was much lower than the contractual level. • A capital cost overrun has the greatest negative effect on the rate of return. • Contracts can be modified to better share the risk.

  19. JURIDICAL WILL IN CONTRACTS

    Directory of Open Access Journals (Sweden)

    Emilian CIONGARU

    2015-07-01

    Full Text Available In the business law, almost all judicial relationships of private law are obligational juridical relationships which are made up of legal acts and facts. The most important legal act is the contract since it is the basis of the social life in any community meaning that it represents the most important economic and juridical instrument for the participants to a contract. The persons are free and equal in society and, consequently, no power is valid and fundamental unless it relies on their consent, namely on a contract. So, the existence of a civil contract relies on the principles of consensualism, a perception based on moral rules to observe one’s promises, to have good faith and to observe the interests of your fellow creature. The exterior manifestation, the expression or declaration of the juridical will constitutes the consent of such person in making the structure of contract. The declared will must correspond to the person’s real will and the adoption and declaration of the juridical will must take place consciously. Any contract that does not derive from juridical will is null and the civilizing character is inexistent. The principles giving sense to consensualism is the one of agreement between parties so as to produce legal effects by itself and it is enough for the conclusion of a contract, regardless of the form in which it is exteriorized, a principle expressed by the Latin adagio pacta sunt servanda.

  20. Whither Performance Contracting?

    Science.gov (United States)

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  1. Democratic contract law

    NARCIS (Netherlands)

    Hesselink, M.W.

    2015-01-01

    This article discusses the normative relationship between contract law and democracy. In particular, it argues that in order to be legitimate contract law needs to have a democratic basis. Private law is not different in this respect from public law. Thus, the first claim made in this article will

  2. 48 CFR 916.504 - Indefinite-quantity contracts.

    Science.gov (United States)

    2010-10-01

    ... indefinite-quantity, multiple award contracts to ensure that adequate consideration exists to contractually... contracts. 916.504 Section 916.504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Indefinite-Delivery Contracts 916.504 Indefinite-quantity...

  3. Agile Contracts

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2014-01-01

    with “endless” re-negotiation of the requirements; you need a more flexible way to develop IS. A new way of coping with many changes is to use an agile development approach and a fixed budget and resources contract. This paper presents an example case. We analyse the case and design a guideline for how......When you have stable and non-ambiguous requirements then a classic contract for IS between a supplier and a public sector institution based on a requirements specification may be well suited. However, if you have to accept many changes or have ambiguous requirements then you may end up...... to implement a fixed budget and resources contract in the public sector. The guideline includes elements to cope with challenges in a tender process such as transparency, criteria for supplier selection, and live assessment of resource skills and capabilities, as well as achieving the flexibility for change...

  4. Iterative Contracts as Proactive Law Instruments

    DEFF Research Database (Denmark)

    Henschel, René Franz

    2012-01-01

    The purpose of this article is to analyse the use of proactive law in contracts illustrated by the use of a particular type of contract within the IT industry, the so-called iterative contract. This type of contract has its root in a special software development process called iterative and incre...... the potential to create more business success. However, empirical research still needs to be done in order to confirm that these types of contracts are better at securing business success than traditional contract forms....

  5. INDEFINITE CONTRACT REVIEW 2000

    CERN Multimedia

    Division des ressources humaines

    2000-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen:1.\tCandidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2.\tThe criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following:staff members who are in their fourth year of service on a fixed-term contract;in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consid...

  6. INDEFINITE CONTRACT REVIEW 2001

    CERN Multimedia

    Human Resources Division

    2001-01-01

    The Director-General has decided to review staff members in professional categories 2 to 5 satisfying the criteria for consideration for the award of an indefinite contract, in accordance with Article R II 1.20 of the Staff Regulations. Staff members holding a fixed-term contract which it has been decided not to renew will not be considered. The following stages are foreseen: 1. Candidates qualifying for review in accordance with Article R II 1.20 of the Staff Regulations and the Administrative Circular N° 9 will be contacted by Human Resources Division. 2. The criteria as to when staff members qualify for review are described in Administrative Circular N° 9. These include the following: staff members who are in their fourth year of service on a fixed-term contract; in addition, for staff members having three years or more of previous relevant service in the Organization on a contract of limited duration (or term-contract) and upon proposal by the division leader concerned, consideration fo...

  7. Freedom of contract, mandatory and non-mandatory law in European contract law

    OpenAIRE

    Storme, M.

    2008-01-01

    Abstract: The purpose of this article is to reflect on the position and function of common European rules in respect of limitations to freedom of contract, and more specifically on the role of mandatory and non-mandatory rules in general. After dealing with this more generally in the first part, the article addresses in its second part the different techniques restricting freedom of contract that we find in the Principles of European Contract Law,(1) the acquis communautaire of the law of the...

  8. Compositional specification of commercial contracts

    DEFF Research Database (Denmark)

    Andersen, Jesper; Elsborg, Ebbe; Henglein, Fritz

    2006-01-01

    -definable analysis of their state before, during and after execution. We provide several realistic examples of commercial contracts and their analyses. A variety of (real) contracts can be expressed in such a fashion as to support their integration, management and analysis in an operational environment......We present a declarative language for compositional specification of contracts governing the exchange of resources. It extends Eber and Peyton Jones’s declarative language for specifying financial contracts (Jones et al. in The Fun of Programming. 2003) to the exchange of money, goods and services...... amongst multiple parties and complements McCarthy’s Resources, Events and Agents (REA) accounting model (McCarthy in Account Rev. LVII(3), 554–578, 1982) with a view- independent formal contract model that supports definition of user-defined contracts, automatic monitoring under execution and user...

  9. 48 CFR 32.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.114 Unusual contract financing. Any contract financing arrangement that deviates from this part is unusual contract financing...

  10. Analysis of Developed Country's Export Contract and Contract Risk and Development of Sample Contract and Guide

    International Nuclear Information System (INIS)

    Lee, D. S.; Oh, K. B.; Chung, W. S.; Lee, K. S.; Yun, S. W.; Lee, J. H.; Lee, B. W.; Kim, H. J.; Yang, M. H.

    2008-10-01

    This paper aimed at developing legal support for the non nuclear power plant industry's export. This study aids establishing government policy and promoting export of non nuclear power plant industry. This paper treated analysis of contractual risk and caution before entering into contract. To promote continuing export result, governmental and legal aids and guide will be required continuously. This study showed risks related with export contract and explained export control acts and procedures

  11. Duplicate Recording of Contracts in the Mechanization of Contract Administration Services System

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    ... in more than one of the system's data bases. We also evaluated whether the Mechanization of Contract Administration Services system had adequate controls to detect and prevent duplicate contract payments, and whether database errors...

  12. Anomalous maximum and minimum for the dissociation of a geminate pair in energetically disordered media

    Science.gov (United States)

    Govatski, J. A.; da Luz, M. G. E.; Koehler, M.

    2015-01-01

    We study the geminated pair dissociation probability φ as function of applied electric field and temperature in energetically disordered nD media. Regardless nD, for certain parameters regions φ versus the disorder degree (σ) displays anomalous minimum (maximum) at low (moderate) fields. This behavior is compatible with a transport energy which reaches a maximum and then decreases to negative values as σ increases. Our results explain the temperature dependence of the persistent photoconductivity in C60 single crystals going through order-disorder transitions. They also indicate how an energetic disorder spatial variation may contribute to higher exciton dissociation in multicomponent donor/acceptor systems.

  13. Caffeine-induced increase in voluntary activation and strength of the quadriceps muscle during isometric, concentric and eccentric contractions.

    Science.gov (United States)

    Behrens, Martin; Mau-Moeller, Anett; Weippert, Matthias; Fuhrmann, Josefin; Wegner, Katharina; Skripitz, Ralf; Bader, Rainer; Bruhn, Sven

    2015-05-13

    This study investigated effects of caffeine ingestion (8 mg/kg) on maximum voluntary torque (MVT) and voluntary activation of the quadriceps during isometric, concentric and eccentric contractions. Fourteen subjects ingested caffeine and placebo in a randomized, controlled, counterbalanced, double-blind crossover design. Neuromuscular tests were performed before and 1 h after oral caffeine and placebo intake. MVTs were measured and the interpolated twitch technique was applied during isometric, concentric and eccentric contractions to assess voluntary activation. Furthermore, normalized root mean square of the EMG signal was calculated and evoked spinal reflex responses (H-reflex evoked at rest and during weak isometric voluntary contraction) as well as twitch torques were analyzed. Caffeine increased MVT by 26.4 N m (95%CI: 9.3-43.5 N m, P = 0.004), 22.5 N m (95%CI: 3.1-42.0 N m, P = 0.025) and 22.5 N m (95%CI: 2.2-42.7 N m, P = 0.032) for isometric, concentric and eccentric contractions. Strength enhancements were associated with increases in voluntary activation. Explosive voluntary strength and voluntary activation at the onset of contraction were significantly increased following caffeine ingestion. Changes in spinal reflex responses and at the muscle level were not observed. Data suggest that caffeine ingestion induced an acute increase in voluntary activation that was responsible for the increased strength regardless of the contraction mode.

  14. The contract - introduction

    International Nuclear Information System (INIS)

    Loeffler, G.

    1975-01-01

    The contract is the last and final step of project planning and the first step of project implementation. The contract has to specify in detail and to the point, as concisely as possible, the complete scope of supplies and work, define all technical particulars and requirements, put forward the conditions of legal, regulatory, administrative and financial procedure, prepare for operating and maintenance instructions to be issued after commissioning. In short, the contract is expected to be a reliable instrument during the manufacturing and construction period as well as a guide-book to assist the owner afterwards in the operation and maintenance of the plant. (orig./FW) [de

  15. Positive effects of robotic exoskeleton training of upper limb reaching movements after stroke

    Science.gov (United States)

    2012-01-01

    This study, conducted in a group of nine chronic patients with right-side hemiparesis after stroke, investigated the effects of a robotic-assisted rehabilitation training with an upper limb robotic exoskeleton for the restoration of motor function in spatial reaching movements. The robotic assisted rehabilitation training was administered for a period of 6 weeks including reaching and spatial antigravity movements. To assess the carry-over of the observed improvements in movement during training into improved function, a kinesiologic assessment of the effects of the training was performed by means of motion and dynamic electromyographic analysis of reaching movements performed before and after training. The same kinesiologic measurements were performed in a healthy control group of seven volunteers, to determine a benchmark for the experimental observations in the patients’ group. Moreover degree of functional impairment at the enrolment and discharge was measured by clinical evaluation with upper limb Fugl-Meyer Assessment scale (FMA, 0–66 points), Modified Ashworth scale (MA, 0–60 pts) and active ranges of motion. The robot aided training induced, independently by time of stroke, statistical significant improvements of kinesiologic (movement time, smoothness of motion) and clinical (4.6 ± 4.2 increase in FMA, 3.2 ± 2.1 decrease in MA) parameters, as a result of the increased active ranges of motion and improved co-contraction index for shoulder extension/flexion. Kinesiologic parameters correlated significantly with clinical assessment values, and their changes after the training were affected by the direction of motion (inward vs. outward movement) and position of target to be reached (ipsilateral, central and contralateral peripersonal space). These changes can be explained as a result of the motor recovery induced by the robotic training, in terms of regained ability to execute single joint movements and of improved interjoint coordination of

  16. Positive effects of robotic exoskeleton training of upper limb reaching movements after stroke

    Directory of Open Access Journals (Sweden)

    Frisoli Antonio

    2012-06-01

    Full Text Available Abstract This study, conducted in a group of nine chronic patients with right-side hemiparesis after stroke, investigated the effects of a robotic-assisted rehabilitation training with an upper limb robotic exoskeleton for the restoration of motor function in spatial reaching movements. The robotic assisted rehabilitation training was administered for a period of 6 weeks including reaching and spatial antigravity movements. To assess the carry-over of the observed improvements in movement during training into improved function, a kinesiologic assessment of the effects of the training was performed by means of motion and dynamic electromyographic analysis of reaching movements performed before and after training. The same kinesiologic measurements were performed in a healthy control group of seven volunteers, to determine a benchmark for the experimental observations in the patients’ group. Moreover degree of functional impairment at the enrolment and discharge was measured by clinical evaluation with upper limb Fugl-Meyer Assessment scale (FMA, 0–66 points, Modified Ashworth scale (MA, 0–60 pts and active ranges of motion. The robot aided training induced, independently by time of stroke, statistical significant improvements of kinesiologic (movement time, smoothness of motion and clinical (4.6 ± 4.2 increase in FMA, 3.2 ± 2.1 decrease in MA parameters, as a result of the increased active ranges of motion and improved co-contraction index for shoulder extension/flexion. Kinesiologic parameters correlated significantly with clinical assessment values, and their changes after the training were affected by the direction of motion (inward vs. outward movement and position of target to be reached (ipsilateral, central and contralateral peripersonal space. These changes can be explained as a result of the motor recovery induced by the robotic training, in terms of regained ability to execute single joint movements and of improved

  17. Motor units in vastus lateralis and in different vastus medialis regions show different firing properties during low-level, isometric knee extension contraction.

    Science.gov (United States)

    de Souza, Leonardo Mendes Leal; Cabral, Hélio Veiga; de Oliveira, Liliam Fernandes; Vieira, Taian Martins

    2018-04-01

    Architectural differences along vastus medialis (VM) and between VM and vastus lateralis (VL) are considered functionally important for the patellar tracking, knee joint stability and knee joint extension. Whether these functional differences are associated with a differential activity of motor units between VM and VL is however unknown. In the present study, we, therefore, investigate neuroanatomical differences in the activity of motor units detected proximo-distally from VM and from the VL muscle. Nine healthy volunteers performed low-level isometric knee extension contractions (20% of their maximum voluntary contraction) following a trapezoidal trajectory. Surface electromyograms (EMGs) were recorded from VM proximal and distal regions and from VL using three linear adhesive arrays of eight electrodes. The firing rate and recruitment threshold of motor units decomposed from EMGs were then compared among muscle regions. Results show that VL motor units reached lower mean firing rates in comparison with VM motor units, regardless of their position within VM (P motor units (P = .997). Furthermore, no significant differences in the recruitment threshold were observed for all motor units analysed (P = .108). Our findings possibly suggest the greater potential of VL to generate force, due to its fibres arrangement, may account for the lower discharge rate observed for VL then either proximally or distally detected motor units in VM. Additionally, the present study opens new perspectives on the importance of considering muscle architecture in investigations of the neural aspects of motor behaviour. Copyright © 2017 Elsevier B.V. All rights reserved.

  18. The distribution contracts: an Iberian approach

    Directory of Open Access Journals (Sweden)

    Sónia de Carvalho

    2016-12-01

    Full Text Available The contracts of commercial distribution are indispensable legal instruments to the development of the economic activity. The distribution, since the industrial revolution, acquired autonomy, given the necessity of specialized intermediation to distribute good and products. In this process, the structural organization of the distribution process suffered mutations, starting to assume a set of activities aiming at adjusting demand to supply, including, among others, clients canvassing, after-sales services, financing and assumption of risks, advisory services, promotion and advertising. The insufficiency of traditional contracts of purchase and sales and commission to satisfy the distributive needs caused by the industrial revolution will justify the development of new contractual schemes, such us agency contract, commercial concession and franchising. The obligation of the distributer to ensure the interests of the producer and to promote the distribution of the goods and services of the producer, in the context of a lasting relation of cooperation between the parts, through which the distributer is incorporated, with greater or minor intensity, in the producer distribution network, allowed us to sustain, as affirmed in the Portuguese and European literature, that distribution contracts could be framed in the same legal category. These contracts, as contracts that were shaped by praxis, do not have, with exception of agency contract, a legal framework in Portugal and Spain. It has been discussed in literature if agency contract legal framework can be applied, by analogy, to the contracts that fit in the legal category of distribution contracts. This paper aims at analyzing the legal framework of contracts of distribution in these legal systems, with the purpose to discuss the analogical application of the agency contract to these contracts.

  19. Salinity Gradient Energy from Expansion and Contraction of Poly(allylamine hydrochloride) Hydrogels.

    Science.gov (United States)

    Bui, Tri Quang; Cao, Vinh Duy; Do, Nu Bich Duyen; Christoffersen, Trine Eker; Wang, Wei; Kjøniksen, Anna-Lena

    2018-06-22

    Salinity gradients exhibit a great potential for production of renewable energy. Several techniques such as pressure-retarded osmosis and reverse electrodialysis have been employed to extract this energy. Unfortunately, these techniques are restricted by the high costs of membranes and problems with membrane fouling. However, the expansion and contraction of hydrogels can be a new and cheaper way to harvest energy from salinity gradients since the hydrogels swell in freshwater and shrink in saltwater. We have examined the effect of cross-linker concentration and different external loads on the energy recovered for this type of energy-producing systems. Poly(allylamine hydrochloride) hydrogels were cross-linked with glutaraldehyde to produce hydrogels with excellent expansion and contraction properties. Increasing the cross-linker concentration markedly improved the energy that could be recovered from the hydrogels, especially at high external loads. A swollen hydrogel of 60 g could recover more than 1800 mJ when utilizing a high cross-linker concentration, and the maximum amount of energy produced per gram of polymer was 3.4 J/g. Although more energy is recovered at high cross-linking densities, the maximum amount of energy produced per gram of polymer is highest at an intermediate cross-linking concentration. Energy recovery was reduced when the salt concentration was increased for the low-concentration saline solution. The results illustrate that hydrogels are promising for salinity gradient energy recovery, and that optimizing the systems significantly increases the amount of energy that can be recovered.

  20. A trace-based model for multiparty contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom; Klaedtke, Felix; Zălinescu, Eugen

    2012-01-01

    In this article we present a model for multiparty contracts in which contract conformance is defned abstractly as a property on traces. A key feature of our model is blame assignment, which means that for a given contract, every breach is attributed to a set of parties. We show that blame...... assignment is compositional by de¿ning contract conjunction and contract disjunction. Moreover, to specify real-world contracts, we introduce the contract speci¿cation language CSL with an operational semantics. We show that each CSL contract has a counterpart in our trace-based model and from...... the operational semantics we derive a run-time monitor. CSL overcomes limitations of previously proposed formalisms for specifying contracts by supporting: (history sensitive and conditional) commitments, parametrised contract templates, relative and absolute temporal constraints, potentially in¿nite contracts...

  1. 48 CFR 916.203-4 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 916.203-4 Section 916.203-4 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 916.203-4 Contract clauses. (d)(2) The...

  2. 48 CFR 232.501-3 - Contract price.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract price. 232.501-3... 232.501-3 Contract price. (b) The contracting officer may approve progress payments when the contract price exceeds the funds obligated under the contract, provided the contract limits the Government's...

  3. Copyright Preemption of Contracts

    OpenAIRE

    Bohannan, Christina

    2008-01-01

    This Article argues that both courts and scholars are wrong in their categorical approaches to preemption of contracts under the Copyright Act, and proposes an intermediate approach that recognizes the importance of both contract rights and federal policy in preemption analysis. First, it argues that both courts and scholars have misapplied preemption law to breach of contract claims. Although the two sides tend to favor opposite results, they take equally categorical approaches. Categori...

  4. 48 CFR 39.107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer...

  5. 48 CFR 970.1504 - Contract pricing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  6. 48 CFR 747.507 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  7. 48 CFR 871.212 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 871.212... Rehabilitation and Employment Service 871.212 Contract clauses. Contracting officers must use the following clauses, as appropriate, in solicitations and contracts for vocational rehabilitation and employment...

  8. Evaluation of the Defense Contract Audit Agency Audit Coverage of Tricare Contracts

    National Research Council Canada - National Science Library

    Brannin, Patricia

    2000-01-01

    Our objective was to evaluate the adequacy of the Defense Contract Audit Agency (DCAA) audit coverage of contracts for health care provided under TRICARE and the former Civilian Health Care and Medical Program of the Uniformed Services...

  9. 29 CFR 4.145 - Extended term contracts.

    Science.gov (United States)

    2010-07-01

    ...'Hara Service Contract Act Changes in Contract Coverage § 4.145 Extended term contracts. (a) Sometimes... purposes of this Act, a contract shall be deemed entered into upon the contract anniversary date which... period is a wholly new contract with respect to application of the Act's provisions and the regulations...

  10. Turnkey contracts

    International Nuclear Information System (INIS)

    Langetepe, G.

    1977-01-01

    To make energy available economically and in sufficient quantity is a main point for the future of an industrial and more for a developing country. The investment costs and the availability of a power plant and in particular for a nuclear power plant are the most significant factors in the economic operation of the plant. In the phase before signing the contract the essential decisions are made with high influence in the economic operation and the availability of the plant. A turn-key contract offers good possibilities to minimize the risks referring a) the plant quality and functionality, b) the plant investment cost, c) the plant completion date, d) the handling of the licensing procedures, e) the availability of the operation. The lecture mentions the points which are of high influence for a successful erection and operation period and which must be clarified before signing the contract between the buyer and supplier of the plant. (orig./HP) [de

  11. 48 CFR 745.106 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 745.106 Section 745.106 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT GOVERNMENT PROPERTY General 745.106 Contract clauses. (a) The contracting officer shall insert the...

  12. 48 CFR 846.710 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 846.710 Section 846.710 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Warranties 846.710 Contract clauses. The contracting officer shall insert the clause at...

  13. 48 CFR 833.215 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 833.215 Section 833.215 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 833.215 Contract clause. The contracting...

  14. 48 CFR 947.7002 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 947.7002 Section 947.7002 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT TRANSPORTATION Foreign Travel 947.7002 Contract clause. When foreign travel may be required under the contract...

  15. 48 CFR 432.412 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 432.412 Section 432.412 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for Non-Commercial Items 432.412 Contract clause. The decision...

  16. Static Verification for Code Contracts

    Science.gov (United States)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  17. Transnational Law of Public Contracts

    NARCIS (Netherlands)

    Audit, M.; Schill, S.W.

    2016-01-01

    Public contracts were traditionally conceived as instruments of domestic public law and used within markets confined to the territory of the state party to the contract. Globalization, however, subjects public contracting to an increasing number of processes that take place at a transnational level

  18. 48 CFR 16.103 - Negotiating contract type.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Selecting Contract Types 16.103 Negotiating contract... basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be...) Contracts on a firm fixed-price basis other than those for major systems or research and development, and (3...

  19. Manual of contracts for the electricity sector. Contracts that work: Drafting and proper legal application. 2. rev. ed.

    International Nuclear Information System (INIS)

    Schoene, Thomas

    2014-01-01

    This manual deals fundamentally with the drafting of contracts for the electricity sector. It covers all types of contracts on both the customer and the network side with their various special clauses and variants, specifically: basic supply, substitute supply, supply contracts for private, commercial and industrial special customers as well as redistributors, EFET contracts, network access contracts, supplier framework contracts, feed-in contracts, grid connection contracts and connection use contracts. The manual also addresses questions concerning electricity customer insolvency, an issue of growing importance. The following topics are furthermore dealt with in a practically oriented manner and with care being taken to explain the underlying legal issues in readily understandable language. What basic framework conditions are specified by the new energy economy laws and general civil law? What possibilities are available in drafting contracts and what are the ramifications in each case? What subject matters in a contract are of particular economic significance? How can concession contracts be designed in a market-conforming way when there is strong competition for qualified rights of way? What opportunities and risks are associated with innovative products? What options for action does a supplier have in the event of (threatening) customer insolvency? Model contracts from day-to-day management practice and tips, checklists and cautioning notes round off this manual.

  20. The effects of gender, level of co-contraction, and initial angle on elbow extensor muscle stiffness and damping under a step increase in elbow flexion moment.

    Science.gov (United States)

    Lee, Yunju; Ashton-Miller, James A

    2011-10-01

    Flexion buckling of an arm under the large ground reaction loads associated with arresting a fall to the ground increases the risk for head and thorax injuries. Yet, the factors that determine the arm buckling load remain poorly understood. We tested the hypothesis in 18 healthy young adults that neither gender, triceps co-contraction level (i.e., 25, 50, or 75% MVC) nor elbow angle would affect the rotational stiffness and damping resistance to step changes in elbow flexion loading. Data on the step response were gathered using optoelectronic markers (150 Hz) and myoelectric activity measurements (2 kHz), and an inverse dynamics analysis was used to estimate elbow extensor stiffness and damping coefficients. A repeated-measures analysis of variance showed that gender (p = 0.032), elbow flexion angle and co-contraction level (both p initial elbow flexion angle and maximum co-contraction, female stiffness and damping coefficients were 18 and 30% less, respectively, than male values after normalization by body height and weight. We conclude that the maximum extensor rotational stiffness and damping at the elbow is lower in women than in men of the same body size, and varies with triceps co-contraction level and initial elbow angle.

  1. The interpretation of administrative contracts

    Directory of Open Access Journals (Sweden)

    Cătălin-Silviu SĂRARU

    2014-06-01

    Full Text Available The article analyzes the principles of interpretation for administrative contracts, in French law and in Romanian law. In the article are highlighted derogations from the rules of contract interpretation in common law. Are examined the exceptions to the principle of good faith, the principle of common intention (willingness of the parties, the principle of good administration, the principle of extensive interpretation of the administrative contract. The article highlights the importance and role of the interpretation in administrative contracts.

  2. 48 CFR 904.7201 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 904.7201... MATTERS Public Affairs 904.7201 Contract clause. The contracting officer shall insert the clause at 952.204-75, Public Affairs, in solicitations and contracts that require the contractor to release...

  3. 2005-2008 government-ANDRA quadrennial contract

    International Nuclear Information System (INIS)

    2006-01-01

    Radioactive waste management represents an important field of intervention for public authorities who define and implement the public policy around these wastes. The public policy defines the safety framework of this management with a permanent care in ensuring the protection of people and of the environment. One fundamental step in the definition of the public policy was the vote of the law from December 30, 1991 which led to the creation of the national agency of radioactive wastes (ANDRA). The ANDRA is a public, industrial and commercial agency in charge of the long term management of radioactive wastes. In order to define the orientations of ANDRA's action, a contract was established in the year 2000 and signed in 2001 for the 2001-2004 era. It has consolidated the general framework of the agency's action and defined the goals to be reached. This contractual approach aimed at giving the public agency an accountableness and at defining priorities with respect to the actions to be implemented. (J.S.)

  4. Increased muscle glucose uptake during contractions

    DEFF Research Database (Denmark)

    Ploug, Thorkil; Galbo, Henrik; Richter, Erik

    1984-01-01

    We reinvestigated the prevailing concept that muscle contractions only elicit increased muscle glucose uptake in the presence of a so-called "permissive" concentration of insulin (Berger et al., Biochem. J. 146: 231-238, 1975; Vranic and Berger, Diabetes 28: 147-163, 1979). Hindquarters from rats...... in severe ketoacidosis were perfused with a perfusate containing insulin antiserum. After 60 min perfusion, electrical stimulation increased glucose uptake of the contracting muscles fivefold. Also, subsequent contractions increased glucose uptake in hindquarters from nondiabetic rats perfused for 1.5 h......-methylglucose uptake increased during contractions and glucose uptake was negative at rest and zero during contractions. An increase in muscle transport and uptake of glucose during contractions does not require the presence of insulin. Furthermore, glucose transport in contracting muscle may only increase if glycogen...

  5. 48 CFR 803.7001 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 803.7001... Practices 803.7001 Contract clause. The contracting officer shall insert the clause at 852.203-71, Display of Department of Veterans Affairs Hotline poster, in solicitations and contracts expected to equal or...

  6. 48 CFR 819.7009 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 819.7009... Acquisition Program 819.7009 Contract clauses. The contracting officer shall insert VAAR clause 852.219-10... Veteran-Owned Small Business Set-Aside in solicitations and contracts for acquisitions under this subpart. ...

  7. 48 CFR 903.971 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 903.971... Contract clause. The contracting officer shall insert the clause at 952.203-70, Whistleblower Protection for Contractor Employees, in contracts that involve work to be done on behalf of DOE directly related...

  8. 48 CFR 53.111 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contract clause. 53.111... AND FORMS FORMS General 53.111 Contract clause. Contracting officers shall insert the clause at 52.253-1, Computer Generated Forms, in solicitations and contracts that require the contractor to submit...

  9. 48 CFR 811.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 811.404... ACQUISITION PLANNING DESCRIBING AGENCY NEEDS Delivery or Performance Schedules 811.404 Contract clause. When delivery is required by or on a particular date for f.o.b. destination contracts, the contracting officer...

  10. 48 CFR 925.7004 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 925.7004... FOREIGN ACQUISITION Acquisition of Nuclear Hot Cell Services 925.7004 Contract clause. The contracting... solicitations and contracts involving nuclear hot cell services. This clause does not flow down to second-tier...

  11. IAEA research contracts. Third annual report

    International Nuclear Information System (INIS)

    1963-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  12. IAEA research contracts. Third annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-04-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports in the field of Radioactive waste management and environmental research included are: Research Contract No.20. Studies in the uptake of radioisotopes by edible marine products; Research Contract No. 33, Behaviour of fission products in soil; Research Contract No.100, Ionic interaction near clay surfaces. Reports dealing with Health physics and radiation protection presented are: Research Contract No.14, The effect of radiation on plant cells and its modification with protective substances; Research Contract No.32, Determination of the enrichment factors of calcium isotopes on ion exchange resins and the investigation of the various systems of electrolytic separation; Research Contract No. 53, Selection of sulphydryl compounds for radiation protection, using a new microbiological method; Research Contract No. 79, A study of the uptake of radioactive calcium in the skeleton. Reports related to Radiobiology are: Research Contract No.11, Genetical investigations on the effect of ionizing radiation on human cells

  13. 48 CFR 1552.217-72 - Option to extend the term of the contract-cost-plus-award-fee contract.

    Science.gov (United States)

    2010-10-01

    ... of the contract-cost-plus-award-fee contract. 1552.217-72 Section 1552.217-72 Federal Acquisition...-award-fee contract. As prescribed in 1517.208(c), insert this contract clause in cost-plus-award-fee... Term of the Contract—Cost-Plus-Award-Fee Contract (APR 1984) (a) The Government has the option to...

  14. 42 CFR 93.204 - Contract.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contract. 93.204 Section 93.204 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS... MISCONDUCT Definitions § 93.204 Contract. Contract means an acquisition instrument awarded under the HHS...

  15. Temperature dependence of attitude sensor coalignments on the Solar Maximum Mission (SMM)

    Science.gov (United States)

    Pitone, D. S.; Eudell, A. H.; Patt, F. S.

    1990-01-01

    The temperature correlation of the relative coalignment between the fine-pointing sun sensor and fixed-head star trackers measured on the Solar Maximum Mission (SMM) is analyzed. An overview of the SMM, including mission history and configuration, is given. Possible causes of the misalignment variation are discussed, with focus placed on spacecraft bending due to solar-radiation pressure, electronic or mechanical changes in the sensors, uncertainty in the attitude solutions, and mounting-plate expansion and contraction due to thermal effects. Yaw misalignment variation from the temperature profile is assessed, and suggestions for spacecraft operations are presented, involving methods to incorporate flight measurements of the temperature-versus-alignment function and its variance in operational procedures and the spacecraft structure temperatures in the attitude telemetry record.

  16. Choreography Synthesis as Contract Agreement

    Directory of Open Access Journals (Sweden)

    Julien Lange

    2013-10-01

    Full Text Available We propose a formal model for distributed systems, where each participant advertises its requirements and obligations as behavioural contracts, and where multiparty sessions are started when a set of contracts allows to synthesise a choreography. Our framework is based on the CO2 calculus for contract-oriented computing, and borrows concepts and results from the session type literature. It supports sessions where the number of participants is not determined beforehand, and keeps CO2's ability to rule out participants that are culpable if contracts are not fulfilled at runtime. We show that we have progress and session fidelity in CO2, as a result of the honesty of participants — i.e., their ability to always adhere to their contracts.

  17. Contract Design: Financial Options and Risk.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of distinct insured clientele

  18. Influence of Joint Angle on EMG-Torque Model During Constant-Posture, Torque-Varying Contractions.

    Science.gov (United States)

    Liu, Pu; Liu, Lukai; Clancy, Edward A

    2015-11-01

    Relating the electromyogram (EMG) to joint torque is useful in various application areas, including prosthesis control, ergonomics and clinical biomechanics. Limited study has related EMG to torque across varied joint angles, particularly when subjects performed force-varying contractions or when optimized modeling methods were utilized. We related the biceps-triceps surface EMG of 22 subjects to elbow torque at six joint angles (spanning 60° to 135°) during constant-posture, torque-varying contractions. Three nonlinear EMG σ -torque models, advanced EMG amplitude (EMG σ ) estimation processors (i.e., whitened, multiple-channel) and the duration of data used to train models were investigated. When EMG-torque models were formed separately for each of the six distinct joint angles, a minimum "gold standard" error of 4.01±1.2% MVC(F90) resulted (i.e., error relative to maximum voluntary contraction at 90° flexion). This model structure, however, did not directly facilitate interpolation across angles. The best model which did so achieved a statistically equivalent error of 4.06±1.2% MVC(F90). Results demonstrated that advanced EMG σ processors lead to improved joint torque estimation as do longer model training durations.

  19. 48 CFR 432.113 - Customary contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 432.113 Section 432.113 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.113 Customary contract financing. The contracting officer may determine the necessity for customary contract financing. The...

  20. 48 CFR 852.222-70 - Contract Work Hours and Safety Standards Act-nursing home care contract supplement.

    Science.gov (United States)

    2010-10-01

    ... Safety Standards Act-nursing home care contract supplement. 852.222-70 Section 852.222-70 Federal...—nursing home care contract supplement. As prescribed in 822.305, for nursing home care requirements, insert the following clause: Contract Work Hours and Safety Standards Act—Nursing Home Care Contract...

  1. 29 CFR 1926.15 - Relationship to the Service Contract Act; Walsh-Healey Public Contracts Act.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Relationship to the Service Contract Act; Walsh-Healey Public Contracts Act. 1926.15 Section 1926.15 Labor Regulations Relating to Labor (Continued... FOR CONSTRUCTION General Interpretations § 1926.15 Relationship to the Service Contract Act; Walsh...

  2. Contracting between firms: empirical evidence

    NARCIS (Netherlands)

    Iyer, R.; Sautner, Z.

    2014-01-01

    We analyse 185 contracts signed between a buyer and 89 suppliers to test how moral-hazard and hold-up problems affect contract design. Our data allow us to study both static and dynamic effects. If a supplier’s products are more critical to the buyer, contracts contain more clauses that address

  3. 48 CFR 17.204 - Contracts.

    Science.gov (United States)

    2010-10-01

    .... (f) Contracts may express options for increased quantities of supplies or services in terms of (1... identified as the option. (g) Contracts may express extensions of the term of the contract as an amended... on the purchase of additional supplies or services, or the overall duration of the term of the...

  4. 48 CFR 1646.201 - Contract Quality Policy.

    Science.gov (United States)

    2010-10-01

    ... EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality... ensure that services acquired under the FEHB contract conform to the contract's quality and audit... assurance program required by the contract and will acknowledge in writing whether or not the system is...

  5. 48 CFR 1515.606-70 - Contracting methods.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracting methods. 1515... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Unsolicited Proposals 1515.606-70 Contracting methods. The Department of Housing and Urban Development-Independent Agencies Appropriation Act...

  6. 48 CFR 842.101 - Contract audit responsibilities.

    Science.gov (United States)

    2010-10-01

    ... CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Audit Services 842.101 Contract audit responsibilities. (a) Contracting officers may use the support services of other agencies to the extent feasible. Examples of such services include: pre-award surveys; quality assurance and technical...

  7. 48 CFR 22.610 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Walsh-Healey Public Contracts Act 22.610... Contracts Act, in solicitations and contracts covered by the Act (see 22.603, 22.604, and 22.605). [61 FR... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clause. 22.610...

  8. Management of transport and handling contracts

    CERN Document Server

    Rühl, I

    2004-01-01

    This paper shall outline the content, application and management strategies for the various contracts related to transport and handling activities. In total, the two sections Logistics and Handling Maintenance are in charge of 27 (!) contracts ranging from small supply contracts to big industrial support contracts. The activities as well as the contracts can generally be divided into four main topics "Vehicle Fleet Management"; "Supply, Installation and Commissioning of Lifting and Hoisting Equipment"; "Equipment Maintenance" and "Industrial Support for Transport and Handling". Each activity and contract requires different approaches and permanent adaptation to the often changing CERN's requirements. In particular, the management and the difficulties experienced with the contracts E072 "Maintenance of lifting and hoisting equipment", F420 "Supply of seven overhead traveling cranes for LHC" and S090/S103 "Industrial support for transport and handling" will be explained in detail.

  9. Housing and bed and board contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2011-01-01

    Full Text Available In this work not only legal nature of catering services is analyzed, but also legal position of parties in it. Catering contract (Housing and Bed and Board Contract is unnamed in our country and the main source of law for this contract are business practices and usage. A lot of attention is paid to this question. Lack of legal norms for this area is general characteristic for most of the tourism contracts. In this contract its title is also debatable because term 'catering services' is not usually used in practice. Although this contract is unnamed in Comparative Law ,in tourist more developed countries there are more codified business practices from this area and there is more Case Law. Having in mind development of tourist economy adequate legal conditions in tourism contract are expected.

  10. IAEA research contracts. Second annual report

    International Nuclear Information System (INIS)

    1962-01-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  11. IAEA research contracts. Second annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1962-07-01

    During the period in which the Agency's research programme has been operative, nearly 150 research contracts have been placed with institutions in 35 Member States. While considerable emphasis was placed initially on research of a more fundamental nature - as reflected by the summaries presented herein of work under contracts awarded in the early stages of the programme - recent policy has shifted the major emphasis toward research of a practical nature, as the results of this type of research are likely to be of more immediate interest to Member States, and particularly to the developing nations. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No. 1, Factors controlling the distribution of fission products in the biosphere; Research Contract No. 4, The development of a method of non-destructive analysis to determine the U-235 and Pu content of irradiated fuel elements that are in storage under water and that have been out of the reactor for periods of more than one month; Research Contract No. 5, Non-destructive method for evaluating the U-235 and Pu content of irradiated fuel elements; Research Contract No. 19, Studies of contamination in local marine resources, and more specifically the determination of horizontal and vertical diffusion rates in Suruga Bay; Research Contract No. 22, A study of the uptake, accumulation and loss of radioactive material by marine bacteria; Research Contract No. 26, (a) Red cell life span in patients with congenital or acquired haemolytic anaemia using Cr-51 and pie-operative spleen scanning; (b) The aeriology of tropical iron deficiency anaemia using Fe-59 in

  12. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.

  13. Forthcoming indefinite contract review procedure

    CERN Multimedia

    Human Resources Department

    2011-01-01

    The vacancy notices for posts opened with a view to the award of an indefinite contract will be published in early April 2011. In the meantime, the list of posts to be opened this spring is available at the following address: Indefinite contract posts - spring 2011 A second exercise will take place in autumn 2011 and, as of 2012, the indefinite contract award procedure will only be held once a year, in autumn. For more information please consult: https://hr-recruit.web.cern.ch/hr-recruit/staff/IndefiniteContracts.asp  

  14. Maximum permissible dose

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    This chapter presents a historic overview of the establishment of radiation guidelines by various national and international agencies. The use of maximum permissible dose and maximum permissible body burden limits to derive working standards is discussed

  15. 48 CFR 432.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 432.114 Unusual contract financing. The HCA is authorized to approve unusual contract financing. The signed determination and finding...

  16. 48 CFR 1332.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 1332.114 Unusual contract financing. The designee authorized to approve unusual contract financing arrangements is set forth in CAM...

  17. 77 FR 71458 - New International Mail Contract

    Science.gov (United States)

    2012-11-30

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a... Contracts 1. This document invites public comments on the request and addresses several related procedural... Reseller Expedited Package (GREP) contract (Contracts 1).\\1\\ It seeks to have the instant Contract included...

  18. ON THE MAXIMUM MASS OF STELLAR BLACK HOLES

    International Nuclear Information System (INIS)

    Belczynski, Krzysztof; Fryer, Chris L.; Bulik, Tomasz; Ruiter, Ashley; Valsecchi, Francesca; Vink, Jorick S.; Hurley, Jarrod R.

    2010-01-01

    We present the spectrum of compact object masses: neutron stars and black holes (BHs) that originate from single stars in different environments. In particular, we calculate the dependence of maximum BH mass on metallicity and on some specific wind mass loss rates (e.g., Hurley et al. and Vink et al.). Our calculations show that the highest mass BHs observed in the Galaxy M bh ∼ 15 M sun in the high metallicity environment (Z = Z sun = 0.02) can be explained with stellar models and the wind mass loss rates adopted here. To reach this result we had to set luminous blue variable mass loss rates at the level of ∼10 -4 M sun yr -1 and to employ metallicity-dependent Wolf-Rayet winds. With such winds, calibrated on Galactic BH mass measurements, the maximum BH mass obtained for moderate metallicity (Z = 0.3 Z sun = 0.006) is M bh,max = 30 M sun . This is a rather striking finding as the mass of the most massive known stellar BH is M bh = 23-34 M sun and, in fact, it is located in a small star-forming galaxy with moderate metallicity. We find that in the very low (globular cluster-like) metallicity environment the maximum BH mass can be as high as M bh,max = 80 M sun (Z = 0.01 Z sun = 0.0002). It is interesting to note that X-ray luminosity from Eddington-limited accretion onto an 80 M sun BH is of the order of ∼10 40 erg s -1 and is comparable to luminosities of some known ultra-luminous X-ray sources. We emphasize that our results were obtained for single stars only and that binary interactions may alter these maximum BH masses (e.g., accretion from a close companion). This is strictly a proof-of-principle study which demonstrates that stellar models can naturally explain even the most massive known stellar BHs.

  19. Food and drink serving contract

    Directory of Open Access Journals (Sweden)

    Veselinović Janko

    2012-01-01

    Full Text Available Food and drink catering service is almost as old as the civilization itself. Even though this vocation is a part of the catering activity, Serbian law does not foresee this contract section as personalized. Key legal sources for this kind of contract are business customs. Food and drink serving contract is a mixed-type contract and its legal nature is very interesting due to its complexity. Specific for this contract is the fact that it is not an ordinary service, but also an activity which requires a degree of culinary skills, knowledge of customs of other nations, as well as other skills. The very category of a good professional in business economy / hospitality industry is very dynamic, as it needs to be evaluated according to all given circumstances, which may be rather unpredictable. By considering the legal nature, but also the rights and obligations of the contracting parties, we tried to point to the questions that require a special attention. Legal sources that indirectly refer to food and drink serving contracts were taken into account. Apart from the Law on Obligatory Relations, we also considered here the Law on Tourism also pointing to the comparative law and jurisprudence.

  20. 48 CFR 32.007 - Contract financing payments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract financing... GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.007 Contract financing payments. (a)(1) Unless... section, the due date for making contract financing payments by the designated payment office is the 30th...

  1. Mechanisms of Short-Term Training-Induced Reaching Improvement in Severely Hemiparetic Stroke Patients: A TMS Study

    Science.gov (United States)

    Harris-Love, Michelle L.; Morton, Susanne M.; Perez, Monica A.; Cohen, Leonardo G.

    2011-01-01

    Background The neurophysiological mechanisms underlying improved upper-extremity motor skills have been partially investigated in patients with good motor recovery but are poorly understood in more impaired individuals, the majority of stroke survivors. Objective The authors studied changes in primary motor cortex (M1) excitability (motor evoked potentials [MEPs], contralateral and ipsilateral silent periods [CSPs and ISPs] using transcranial magnetic stimulation [TMS]) associated with training-induced reaching improvement in stroke patients with severe arm paresis (n = 11; Upper-Extremity Fugl-Meyer score (F-M) = 27 ± 6). Methods All patients underwent a single session of reaching training focused on moving the affected hand from a resting site to a target placed at 80% of maximum forward reaching amplitude in response to a visual “GO” cue. Triceps contribute primarily as agonist and biceps primarily as antagonist to the trained forward reaching movement. Response times were recorded for each reaching movement. Results Preceding training (baseline), greater interhemispheric inhibition (measured by ISP) in the affected triceps muscle, reflecting inhibition from the nonlesioned to the lesioned M1, was observed in patients with lower F-M scores (more severe motor impairment). Training-induced improvements in reaching were greater in patients with slower response times at baseline. Increased MEP amplitudes and decreased ISPs and CSPs were observed in the affected triceps but not in the biceps muscle after training. Conclusion These results indicate that along with training-induced motor improvements, training-specific modulation of intrahemispheric and interhemispheric mechanisms occurs after reaching practice in chronic stroke patients with substantial arm impairment. PMID:21343522

  2. 32 CFR 21.625 - Contract.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Contract. 21.625 Section 21.625 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE DoD GRANT AND AGREEMENT REGULATIONS DoD GRANTS AND AGREEMENTS-GENERAL MATTERS Definitions § 21.625 Contract. See the definition for procurement contract in this...

  3. On the Dogmatics of Contract Interpretation

    Institute of Scientific and Technical Information of China (English)

    Yang Guoqing

    2017-01-01

    The interpretation of contract has attracted much attention in the practice of contract law and the basic problems to be solved are what the parties agree on and how to set up the rules of adjudication. The present domestic studies are not conducive to contract prac-tices because they either unnecessarily elevate scientific problems to the speculative realm of fantasy, or make the problems become more unreal and abstract. The two traditional theories of contract interpretation do not conflict in values in terms of the autonomy of the will and trust protection. However, in today' s society where cultural pluralism and legal value plural-ism exist, because of different contract practices, differentiation and individualization of con-tract interpretation will become the basic patterns. Therefore, it is impossible and unnecessary to construct a unitary model, but it is of great significance to introduce the dogmatics-orien-ted contract interpretation.

  4. 48 CFR 942.270-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 942.270-2 Section 942.270-2 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Services 942.270-2 Contract clause. The clause at 952...

  5. 23 CFR 635.125 - Termination of contract.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.125 Termination of contract. (a) All contracts exceeding... 23 Highways 1 2010-04-01 2010-04-01 false Termination of contract. 635.125 Section 635.125... the termination will be effected and the basis for settlement. In addition, such contracts shall...

  6. 48 CFR 970.2210 - Service Contract Act.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Service Contract Act. 970... REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Application of Labor Policies 970.2210 Service Contract Act. The Service Contract Act of 1965 is not applicable to contracts for the management and operation of...

  7. Implementation of Maximum Power Point Tracking (MPPT) Solar Charge Controller using Arduino

    Science.gov (United States)

    Abdelilah, B.; Mouna, A.; KouiderM’Sirdi, N.; El Hossain, A.

    2018-05-01

    the platform Arduino with a number of sensors standard can be used as components of an electronic system for acquiring measures and controls. This paper presents the design of a low-cost and effective solar charge controller. This system includes several elements such as the solar panel converter DC/DC, battery, circuit MPPT using Microcontroller, sensors, and the MPPT algorithm. The MPPT (Maximum Power Point Tracker) algorithm has been implemented using an Arduino Nano with the preferred program. The voltage and current of the Panel are taken where the program implemented will work and using this algorithm that MPP will be reached. This paper provides details on the solar charge control device at the maximum power point. The results include the change of the duty cycle with the change in load and thus mean the variation of the buck converter output voltage and current controlled by the MPPT algorithm.

  8. Flow model for open-channel reach or network

    Science.gov (United States)

    Schaffranek, R.W.

    1987-01-01

    Formulation of a one-dimensional model for simulating unsteady flow in a single open-channel reach or in a network of interconnected channels is presented. The model is both general and flexible in that it can be used to simulate a wide range of flow conditions for various channel configurations. It is based on a four-point (box), implicit, finite-difference approximation of the governing nonlinear flow equations with user-definable weighting coefficients to permit varying the solution scheme from box-centered to fully forward. Unique transformation equations are formulated that permit correlation of the unknowns at the extremities of the channels, thereby reducing coefficient matrix and execution time requirements. Discharges and water-surface elevations computed at intermediate locations within a channel are determined following solution of the transformation equations. The matrix of transformation and boundary-condition equations is solved by Gauss elimination using maximum pivot strategy. Two diverse applications of the model are presented to illustrate its broad utility. (USGS)

  9. 48 CFR 542.1107 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Production Surveillance and Reporting 542.1107 Contract... clause may be used in indefinite-delivery definite-quantity contracts for Stock or Special Order Program...

  10. Contract law for physicians. The basics.

    Science.gov (United States)

    Eelkema, R

    1989-02-01

    As part of the Minnesota Medical Association's ongoing contract review process, this article provides information to help educate physicians about the major managed care contracts being offered to them. The information provided is not intended to, nor should it be a substitute for legal advice pertaining to an individual's practice and specific contracts with third parties. The MMA will not be making recommendations regarding the merits of any particular contract. A decision to enter into a contract rests with the physician and his or her clinic in consultation with private legal counsel.

  11. Covenant Violations and Dynamic Loan Contracting

    DEFF Research Database (Denmark)

    Freudenberg, Felix; Imbierowicz, Björn; Saunders, Anthony

    2017-01-01

    This paper examines the dynamic allocation of control rights in private debt contracts of firms. We show that a covenant violation in the prior loan contract implies a stigma for borrowers which results in stricter loan contract terms in subsequent new loan contracts. Our analyses reject...... potentially other explanations such as firm characteristics or agency problems between the lender and firm management, shareholders or public debtholders. After covenant violations in the prior contract, new loans have on average 18 bps higher spreads and include more of those covenant types which also have...

  12. 24 CFR 983.203 - HAP contract information.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract information. 983.203... DEVELOPMENT PROJECT-BASED VOUCHER (PBV) PROGRAM Housing Assistance Payments Contract § 983.203 HAP contract information. The HAP contract must specify: (a) The total number of contract units by number of bedrooms; (b...

  13. 48 CFR 970.1706-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1706... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1706-2 Contract clause. The contracting officer shall insert the clause at 48 CFR 52.217-9, Option to Extend the Term of...

  14. 48 CFR 970.1707-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1707... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Special Contracting Methods 970.1707-4 Contract clause. Insert the clause at 970.5217-1, Work for Others Program (Non-DOE Funded Work), in any contract...

  15. Glucose uptake and transport in contracting, perfused rat muscle with different pre-contraction glycogen concentrations

    DEFF Research Database (Denmark)

    Hespel, P; Richter, Erik

    1990-01-01

    1. Glucose uptake and transport, muscle glycogen, free glucose and glucose-6-phosphate concentrations were studied in perfused resting and contracting rat skeletal muscle with different pre-contraction glycogen concentrations. Rats were pre-conditioned by a combination of swimming exercise and diet......, resulting in either low (glycogen-depleted rats), normal (control rats) or high (supercompensated rats) muscle glycogen concentrations at the time their hindlimbs were perfused. 2. Compared with control rats, pre-contraction muscle glycogen concentration was approximately 40% lower in glycogen-depleted rats......, whereas it was 40% higher in supercompensated rats. Muscle glycogen break-down correlated positively (r = 0.76; P less than 0.001) with pre-contraction muscle glycogen concentration. 3. Glucose uptake during contractions was approximately 50% higher in glycogen-depleted hindquarters than in control...

  16. Contract management survey 2002.

    Science.gov (United States)

    Hoppszallern, Suzanna

    2002-10-01

    Spending on clinical contracts continues to outpace spending on business services, but may be leveling off. The 12th annual Contract Management Survey shows that the performance of clinical vendors is now comparable to business service vendors in meeting savings targets. Both business and clinical vendors are receiving higher marks from hospital leaders, but execs quickly respond to low marks by bringing the service back in-house of changing vendors. This report examines trends in outsourcing, satisfaction levels, the decision-making process, contract features and performance, and spending.

  17. LQ optimal and reaching law-based sliding modes for inventory management systems

    Science.gov (United States)

    Ignaciuk, Przemysław; Bartoszewicz, Andrzej

    2012-01-01

    In this article, the theory of discrete sliding-mode control is used to design new supply strategies for periodic-review inventory systems. In the considered systems, the stock used to fulfil an unknown, time-varying demand can be replenished from a single supply source or from multiple suppliers procuring orders with different delays. The proposed strategies guarantee that demand is always entirely satisfied from the on-hand stock (yielding the maximum service level), and the warehouse capacity is not exceeded (which eliminates the cost of emergency storage). In contrast to the classical, stochastic approaches, in this article, we focus on optimising the inventory system dynamics. The parameters of the first control strategy are selected by minimising a quadratic cost functional. Next, it is shown how the system dynamical performance can be improved by applying the concept of a reaching law with the appropriately adjusted reaching phase. The stable, nonoscillatory behaviour of the closed-loop system is demonstrated and the properties of the designed controllers are discussed and strictly proved.

  18. Contract design

    International Nuclear Information System (INIS)

    Bradley, P.

    2006-01-01

    The current state of the electric power industry in Ontario was discussed with particular reference to the procurement of contracts and why the Ontario Power Authority (OPA) must be contracting to resolve many of Ontario's electricity issues. As Ontario increasingly relies on imports and natural gas-fired generation, the price of electricity continues to rise given that supply is at a low level. In addition to the generation gap, there are also several transmission constrained areas in Ontario, particularly in the Greater Toronto Area (GTA). The OPA announced 2 projects totalling 1900 MW to relieve congestion. According to the Independent Electricity System Operator (IESO), the total potential opportunity for new generation by 2015 is about 5,000 to 7,000 megawatts. OPA is expected to launch procurement processes for up to 1000 MW of cogeneration, 250 MW of province-wide conservation initiatives, 1900 MW of generation in the western part of the GTA, and 600 MW of generation in downtown Toronto. New nuclear capacity is also anticipated in addition to renewables and conservation/demand management (CDM) initiatives. The OPA's competitive procurement processes will include requests for expressions of interest, requests for qualifications and requests for proposals. The challenge of balancing the technical complexities and realities of procuring generation assets with the need for a fair procurement process was discussed. Contracts will be designed to react to market signals and will include 3 styles: tariff style, tolling style and standard offer contract. OPA will make every effort to balance generator and ratepayer interests. 6 figs

  19. Price management mechanisms and the gas contract

    International Nuclear Information System (INIS)

    Dickson, D.J.

    1996-01-01

    Pricing objectives and risk management strategies that can be achieved through the proper use of the standard gas contract, were discussed. Main topics of discussion were: (1) gas sales contract and convertible pricing, (2) gas contract and imbedded hedging, gas contracts and exchange traded instruments, (4) gas contracts fixed for floating swaps, and OTC options and exotics, (5) options and exotic price structures, and (6) advantages and disadvantages of using the gas contract versus the swap agreement

  20. 42 CFR 414.422 - Terms of contracts.

    Science.gov (United States)

    2010-10-01

    ...)(i) of the Act, if applicable to such subcontractor. (g) Breach of contract. (1) Any deviation from... requirements, constitutes a breach of contract. (2) In the event a contract supplier breaches its contract, CMS... 42 Public Health 3 2010-10-01 2010-10-01 false Terms of contracts. 414.422 Section 414.422 Public...

  1. Bottomland Hardwood Planting: Example Contract Specifications

    National Research Council Canada - National Science Library

    Humprey, Monica

    2002-01-01

    This technical note provides an example of contract specifications that can be used as a template by USACE biologists, engineers, or contracting officers for contracting the planting of bottomland hardwood (BLH) seedlings...

  2. UNIDROITED POSITION AS A SOURCE OF CONTRACT LAW IN THE FUTURE OF INDONESIAN CONTRACT LAW AMANDEMENT

    Directory of Open Access Journals (Sweden)

    N. Ike Kusmiati

    2018-01-01

    Full Text Available [Unidroited Position As A Source Of Contract Law In The Future Of Indonesian Contract Law Amandement] Business transaction often faced the issue of ensuring that the rights and obligation are fulfilled as the agreement as agreed, especially when facing the difficulties of the rights and obligation of the parties due to different legal system between countries. Thereore, to answer the problems  the parties will seek legal sources, namely book III of the Civil Code in addition to studying and understanding the principles of internasional commercial contract law, namely UNIDROIT which contains principles that can be adopted as one of the works that seek Standarization of contract law to encourage the harmonization of commercial law international efforts to bring together different business actors between countries, so that the same legal basis is required in the coming renewal of Indonesia contract law. Keyword : Position, UNIDROIT, Law, Contract, Indonesia.

  3. Optimal Long-term Contracting with Learning

    OpenAIRE

    Jianfeng Yu; Bin Wei; Zhiguo He

    2012-01-01

    This paper introduces profitability uncertainty into an infinite-horizon variation of the classic Holmstrom and Milgrom (1987) model, and studies optimal dynamic contracting with endogenous learning. The agent's potential belief manipulation leads to the hidden information problem, which makes incentive provisions intertemporally linked in the optimal contract. We reduce the contracting problem into a dynamic programming problem with one state variable, and characterize the optimal contract w...

  4. Effect of vibration during fatiguing resistance exercise on subsequent muscle activity during maximal voluntary isometric contractions.

    Science.gov (United States)

    McBride, Jeffrey M; Porcari, John P; Scheunke, Mark D

    2004-11-01

    This investigation was designed to determine if vibration during fatiguing resistance exercise would alter associated patterns of muscle activity. A cross-over design was employed with 8 subjects completing a resistance exercise bout once with a vibrating dumbbell (V) (44 Hz, 3 mm displacement) and once without vibration (NV). For both exercise bouts, 10 sets were performed with a load that induced concentric muscle failure during the 10th repetition. The appropriate load for each set was determined during a pretest. Each testing session was separated by 1 week. Electromyography (EMG) was obtained from the biceps brachii muscle at 12 different time points during a maximum voluntary contraction (MVC) at a 170 degrees elbow angle after each set of the dumbbell exercise. The time points were as follows: pre (5 minutes before the resistance exercise bout), T1-T10 (immediately following each set of resistance exercise), and post (15 minutes after the resistance exercise bout). EMG was analyzed for median power frequency (MPF) and maximum (mEMG). NV resulted in a significant decrease in MPF at T1-T4 (p recruitment of high threshold motor units during fatiguing contractions. This may indicate the usage of vibration with resistance exercise as an effective tool for strength training athletes.

  5. Contract Design: Risk Management and Evaluation.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent's returns on the provider's gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment have widely differing model and forecast

  6. 48 CFR 801.602-73 - Review requirements for scarce medical specialist contracts and contracts for health-care resources.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Review requirements for scarce medical specialist contracts and contracts for health-care resources. 801.602-73 Section 801.602... Responsibilities 801.602-73 Review requirements for scarce medical specialist contracts and contracts for health...

  7. Utility Energy Services Contracts: Enabling Documents

    Energy Technology Data Exchange (ETDEWEB)

    None

    2009-05-01

    Utility Energy Services Contracts: Enabling Documents provides materials that clarify the authority for Federal agencies to enter into utility energy services contracts (UESCs), as well as sample documents and resources to ease utility partnership contracting.

  8. Functional reach and lateral reach tests adapted for aquatic physical therapy

    Directory of Open Access Journals (Sweden)

    Ana Angélica Ribeiro de Lima

    Full Text Available Abstract Introduction: Functional reach (FR and lateral reach (LR tests are widely used in scientific research and clinical practice. Assessment tools are useful in assessing subjects with greater accuracy and are usually adapted according to the limitations of each condition. Objective: To adapt FR and LR tests for use in an aquatic environment and assess the performance of healthy young adults. Methods: We collected anthropometric data and information on whether the participant exercised regularly or not. The FR and LR tests were adapted for use in an aquatic environment and administered to 47 healthy subjects aged 20-30 years. Each test was repeated three times. Results: Forty-one females and six males were assessed. The mean FR test score for men was 24.06 cm, whereas the mean value for right lateral reach (RLR was 10.94 cm and for left lateral reach (LLR was 9.78 cm. For females, the mean FR score was 17.57 cm, while the mean values for RLR was 8.84cm and for LLR was 7.76 cm. Men performed better in the FR (p < 0.001 and RLR tests than women (p = 0.037. Individuals who exercised regularly showed no differences in performance level when compared with their counterparts. Conclusion: The FR and LR tests were adapted for use in an aquatic environment. Males performed better on the FR and RLR tests, when compared to females. There was no correlation between the FR and LR tests and weight, height, Body Mass Index (BMI, foot length or length of the dominant upper limb.

  9. Galilean contractions of W-algebras

    Directory of Open Access Journals (Sweden)

    Jørgen Rasmussen

    2017-09-01

    Full Text Available Infinite-dimensional Galilean conformal algebras can be constructed by contracting pairs of symmetry algebras in conformal field theory, such as W-algebras. Known examples include contractions of pairs of the Virasoro algebra, its N=1 superconformal extension, or the W3 algebra. Here, we introduce a contraction prescription of the corresponding operator-product algebras, or equivalently, a prescription for contracting tensor products of vertex algebras. With this, we work out the Galilean conformal algebras arising from contractions of N=2 and N=4 superconformal algebras as well as of the W-algebras W(2,4, W(2,6, W4, and W5. The latter results provide evidence for the existence of a whole new class of W-algebras which we call Galilean W-algebras. We also apply the contraction prescription to affine Lie algebras and find that the ensuing Galilean affine algebras admit a Sugawara construction. The corresponding central charge is level-independent and given by twice the dimension of the underlying finite-dimensional Lie algebra. Finally, applications of our results to the characterisation of structure constants in W-algebras are proposed.

  10. 78 FR 41331 - Federal Acquisition Regulation; Publicizing Contract Actions; Contracting by Negotiation

    Science.gov (United States)

    2013-07-10

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE ADMINISTRATION 48 CFR Parts 5 and 15 Federal Acquisition Regulation; Publicizing Contract Actions; Contracting by Negotiation CFR Correction In Title 48 of the Code of Federal Regulations, Chapter 1 (Parts 1 to 51), revised as of October 1, 2012, on page 115, in...

  11. Choice of Contract Type and Other Policy Initiatives for Reducing Contract Prices

    Science.gov (United States)

    2013-09-01

    system franchise model). Assume that the contractor retained ownership of the design rights so that subsequent procurement lots are not open to...2 1. The Weapon System Franchise Model ..........................................................2 2. The Agency Problem and...40 2. Contracting for Time vs . Contracting for Performance ..............................41 B. Empirical Analysis of DoD Service

  12. 48 CFR 315.371 - Contract preparation and award.

    Science.gov (United States)

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Source Selection 315.371 Contract... the contract until the finance office certifies that the funds are available for obligation. ...

  13. Government Contract Law (9th Edition)

    Science.gov (United States)

    1987-04-01

    This Ninth Edition, like its predecessors, will serve as the textbook for the Government Contract Law taught at the School of Systems and Logistics...drawn from Government Contract Law -Cases, 1987 edition, for a rounded approach to the subject. This edition of the text includes coverage of the...Government Contract Law complements the Federal Acquisition Regulation and provides a preventive law treatment for contracting personnel. While it may

  14. The Relationship between the Employment Contract and other Civil Contracts

    OpenAIRE

    Răzvan Radu Popescu

    2015-01-01

    The employment relationship is a contractual one and as such must have all the basic elements of an enforceable contract to make it legally binding. In strict contractual terms, the offer is made by the employer and formally accepted by the employee. Once the acceptance has taken place, there is a legally binding agreement and an action will lie against the party who breaches that agreement, even though it may only just have come into existence. An employment contract, however, is...

  15. Corrective justice and contract law

    OpenAIRE

    Martín Hevia

    2010-01-01

    This article suggests that the central aspects of contract law in various jurisdictions can be explained within the idea of corrective justice. The article is divided into three parts. The first part distinguishes between corrective justice and distributive justice. The second part describes contract law. The third part focuses on actions for breach of contract and within that context reflects upon the idea of corrective justice.

  16. 78 FR 11699 - International Mail Contract

    Science.gov (United States)

    2013-02-19

    ... additional International Business Reply Service (IBRS) Competitive Contract 3 negotiated service agreement... International Business Reply Service Competitive Contract 3 Negotiated Service Agreement, February 11, 2013.... 684, Order Approving International Business Reply Service Competitive Contract 3 Negotiated Service...

  17. 2001 contract management survey.

    Science.gov (United States)

    2001-10-01

    For the second year running, hospitals are spending more on clinical outsourcing than on business services. The Eleventh Annual Contract Services Survey shows that, in clinical areas, executives use outsourcing to acquire specialized expertise with cost savings secondary. Reducing costs and FTEs are the primary reasons for outsourcing business operations. Business service contracts are more likely to meet expectations for cost savings. Overall, satisfaction levels are up, but in some areas there's still a lot of room for improvement. This report examines current trends in outsourcing, strategies for the future, satisfaction levels, the decisionmaking process, contract features, and costs.

  18. 48 CFR 32.113 - Customary contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.113 Section 32.113 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.113 Customary contract financing. The solicitation must specify the customary contract financing offerors may...

  19. Process Improvement for Interinstitutional Research Contracting.

    Science.gov (United States)

    Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca

    2015-08-01

    Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.

  20. 7 CFR 1469.25 - Contract violations and termination.

    Science.gov (United States)

    2010-01-01

    ... termination without delay. (c) If NRCS terminates a contract due to breach of contract, the participant will... terminates a contract due to breach of contract, or the participant voluntarily terminates the contract... 7 Agriculture 10 2010-01-01 2010-01-01 false Contract violations and termination. 1469.25 Section...

  1. Motor Unit Activity during Fatiguing Isometric Muscle Contraction in Hemispheric Stroke Survivors

    Directory of Open Access Journals (Sweden)

    Lara McManus

    2017-11-01

    Full Text Available Enhanced muscle weakness is commonly experienced following stroke and may be accompanied by increased susceptibility to fatigue. To examine the contributions of central and peripheral factors to isometric muscle fatigue in stroke survivors, this study investigates changes in motor unit (MU mean firing rate, and action potential duration during, and directly following, a sustained submaximal fatiguing contraction at 30% maximum voluntary contraction (MVC. A series of short contractions of the first dorsal interosseous muscle were performed pre- and post-fatigue at 20% MVC, and again following a 10-min recovery period, by 12 chronic stroke survivors. Individual MU firing times were extracted using surface EMG decomposition and used to obtain the spike-triggered average MU action potential waveforms. During the sustained fatiguing contraction, the mean rate of change in firing rate across all detected MUs was greater on the affected side (-0.02 ± 0.03 Hz/s than on the less-affected side (-0.004 ± 0.003 Hz/s, p = 0.045. The change in firing rate immediately post-fatigue was also greater on the affected side than less-affected side (-13.5 ± 20 and 0.1 ± 19%, p = 0.04. Mean MU firing rates increased following the recovery period on the less-affected side when compared to the affected side (19.3 ± 17 and 0.5 ± 20%, respectively, p = 0.03. MU action potential duration increased post-fatigue on both sides (10.3 ± 1.2 to 11.2 ± 1.3 ms on the affected side and 9.9 ± 1.7 to 11.2 ± 1.9 ms on the less-affected side, p = 0.001 and p = 0.02, respectively, and changes in action potential duration tended to be smaller in subjects with greater impairment (p = 0.04. This study presents evidence of both central and peripheral fatigue at the MU level during isometric fatiguing contraction for the first time in stroke survivors. Together, these preliminary observations indicate that the response to an isometric fatiguing contraction differs between the

  2. 48 CFR 32.104 - Providing contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.104 Section 32.104 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.104 Providing contract financing. (a) Prudent contract financing can be a useful working tool in Government...

  3. Invalidity of contract: legislative regulation and types

    Directory of Open Access Journals (Sweden)

    Василь Іванович Крат

    2017-09-01

    Full Text Available Invalidity contracts always attracted attention researchers. Without regard to it, in modern conditions there is an enormous layer of the problems related to invalidity contract, that to require a doctrine and utilitarian comprehension. The article is sanctified to research invalidity contract. In the article analyses problems of the legislative regulation and types of invalidity contract through the prism of judicial practice. In the Civil code of Ukraine, a voidable contract sets as a common rule. A voidable of the contract is incarnated in the so-called «virtual» invalidity when only the most typical grounds are enumerated. However, even such approach does not allow to overcome all possible cases that arise up in practice. Such situation touches possibility of voidable contracts concluded with the purpose of to shut out the appeal of claim to the property of the debtor. Therefore it follows to set general rules in relation to voidable contracts of the debtor. A nullity of the contract takes place only in the case when there is the direct pointing of law on the qualification of that or another contract as the nullity. The nullity of contract in the Civil code of Ukraine is constructed by means of «textual» invalidity. There are no single attempts to use the construction of «virtual» invalidity in judicial practice when there is the direct pointing of law on the qualification of that or another contract as the nullity, that is impermissible. Methodologically incorrectly to carry out identifying of invalidity contract and obligation with the aim of providing of application of different after the rich in content filling norms.

  4. Proposal to negotiate an amendment to an exisiting contract for the supply of additional Multi-layer Insulation (MLI) blankets for the LHC

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply of additional sets of MLI blankets. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to an existing contract with JEHIER (FR) for the supply of additional MLI blanket sets for an amount of 1 020 000 euros (1 625 000 Swiss francs), bringing the total to a maximum amount of 8 954 359 euros (14 266 084 Swiss francs), subject to revision for inflation. The amounts in Swiss francs have been calculated using the present rate of exchange.

  5. Corrupt Relational Contracting

    OpenAIRE

    Johann Graf Lambsdorff; Sitki Utku Teksoz

    2002-01-01

    Because corruption must be hidden from the public and is not enforced by courts it entails transaction costs, which are larger than those from legal exchange. This suggests that corrupt contracts are primarily relational contracts where legal exchange serves as a basis for sealing and enforcing corrupt agreements. Legal exchange not only provides for corrupt opportunities, but for the necessary enforcement mechanisms. Examples of such legal exchange are long-term business exchange, belonging ...

  6. Expansionary fiscal contractions

    DEFF Research Database (Denmark)

    Bergman, Ulf Michael; Hutchison, Michael

    2010-01-01

    The Expansionary Fiscal Contraction (EFC) hypothesis predicts that a major fiscal consolidation leads to an economic expansion under certain circumstances. We test this hypothesis, and the implied non-linear responses of the economy to large and small changes in fiscal policy, using data from...... that the exogenous fiscal contraction in Denmark was a credible regime shift and, together with other reforms undertaken at the time, increased both private consumption and aggregate output....

  7. 42 CFR 422.504 - Contract provisions.

    Science.gov (United States)

    2010-10-01

    ...) MEDICARE PROGRAM MEDICARE ADVANTAGE PROGRAM Application Procedures and Contracts for Medicare Advantage... determinations of amounts payable under the contract. (iv) Properly reflect all direct and indirect costs claimed..., contracts, and subcontracts. (vi) Franchise, marketing, and management agreements. (vii) Schedules of...

  8. 78 FR 11237 - International Mail Contract

    Science.gov (United States)

    2013-02-15

    ... POSTAL REGULATORY COMMISSION [Docket No. CP2013-49; Order No. 1654] International Mail Contract... Service filing concerning an additional Global Reseller Expedited Package Contract 1 Negotiated Service... additional Global Reseller Expedited Package Contracts 1 negotiated service agreement (Agreement).\\1\\ It...

  9. 77 FR 16568 - International Mail Contract

    Science.gov (United States)

    2012-03-21

    ...-filed Postal Service request to enter into an additional International Business Reply Service contract... additional International Business Reply Service (IBRS) contract.\\1\\ The Postal Service asserts that the... Service Filing of a Functionally Equivalent International Business Reply Service Competitive Contract 3...

  10. 77 FR 76091 - International Mail Contract

    Science.gov (United States)

    2012-12-26

    ... an expired International Business Reply Service (IBRS) competitive contract.\\1\\ The Postal Service... International Business Reply Service Competitive Contract 1 Negotiated Service Agreement, December 14, 2012... history. The Commission added International Business Reply Service Contract 1 to the competitive product...

  11. 77 FR 12888 - International Mail Contract

    Science.gov (United States)

    2012-03-02

    ...-filed Postal Service request to enter into an additional International Business Reply Service contract... additional International Business Reply Service (IBRS) contract.\\1\\ The Postal Service asserts that the... Service Filing of a Functionally Equivalent International Business Reply Service Competitive Contract 3...

  12. Alternative staffing services. Contract transcription.

    Science.gov (United States)

    Tessier, C

    1992-03-01

    Contract medical transcription services can be of great assistance in meeting the demands for transcription, without jeopardizing patient, physician, or institutional confidentiality. You simply must require the contract service to provide at least the same degree of protection and preservation of confidentiality that you should require inhouse. To achieve this you must make these requirements explicit, comprehensive, comprehensible, believable, and enforceable. Discuss the requirements with prospective contractors. Review them at least annually with existing contractors and when contracts are due for renewal. Be sure to specify the consequence of breaching confidentiality, and if there are breaches, enforce the terms of the contract. Consult your institution's legal counsel both in developing the contract and in enforcing its provisions. Take into consideration your department's and institution's policies, AHIMA's statement on confidentiality, as well as local, state, and federal laws. Above all, never lose sight of the patient. Ultimately, it is not patient information that you are obligated to protect. It is the patient.

  13. Quebec-USA electricity export contracts

    International Nuclear Information System (INIS)

    Labbe, J.-F.

    1993-06-01

    Electricity exports from Hydro-Quebec to utilities in the USA significantly affects the economy and environment of Quebec. These exports may be arranged under interconnection agreements to sell excess capacity and production during off-peak periods or under firm sales contracts. Hydro-Quebec exports could also replace power plants that would otherwise be needed in the USA. The economic environment for Hydro-Quebec exports to the USA is reviewed along with the regulatory environment applicable to international trade (General Agreement on Tariffs and Trade, Canada-USA Free Trade Agreement, North American Free Trade Agreement), Quebec (Canadian federal and provincial law), and the USA (federal and state law). A jurisdictional analysis of power export contracts is then presented, citing examples of contracts already signed by Hydro-Quebec with utilities in New York and New England. Contract law and contract provisions are discussed, including common clauses and particular clauses. Suggestions are made for new clauses that would improve the electricity trade. 215 refs., 13 figs., 3 tabs

  14. Consistency assessment of rating curve data in various locations using Bidirectional Reach (BReach)

    Science.gov (United States)

    Van Eerdenbrugh, Katrien; Van Hoey, Stijn; Coxon, Gemma; Freer, Jim; Verhoest, Niko E. C.

    2017-10-01

    When estimating discharges through rating curves, temporal data consistency is a critical issue. In this research, consistency in stage-discharge data is investigated using a methodology called Bidirectional Reach (BReach), which departs from a (in operational hydrology) commonly used definition of consistency. A period is considered to be consistent if no consecutive and systematic deviations from a current situation occur that exceed observational uncertainty. Therefore, the capability of a rating curve model to describe a subset of the (chronologically sorted) data is assessed in each observation by indicating the outermost data points for which the rating curve model behaves satisfactorily. These points are called the maximum left or right reach, depending on the direction of the investigation. This temporal reach should not be confused with a spatial reach (indicating a part of a river). Changes in these reaches throughout the data series indicate possible changes in data consistency and if not resolved could introduce additional errors and biases. In this research, various measurement stations in the UK, New Zealand and Belgium are selected based on their significant historical ratings information and their specific characteristics related to data consistency. For each country, regional information is maximally used to estimate observational uncertainty. Based on this uncertainty, a BReach analysis is performed and, subsequently, results are validated against available knowledge about the history and behavior of the site. For all investigated cases, the methodology provides results that appear to be consistent with this knowledge of historical changes and thus facilitates a reliable assessment of (in)consistent periods in stage-discharge measurements. This assessment is not only useful for the analysis and determination of discharge time series, but also to enhance applications based on these data (e.g., by informing hydrological and hydraulic model

  15. 48 CFR 4.101 - Contracting officer's signature.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contracting officer's signature. 4.101 Section 4.101 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL ADMINISTRATIVE MATTERS Contract Execution 4.101 Contracting officer's signature. Only contracting officers shall...

  16. 77 FR 54937 - International Mail Postal Contract

    Science.gov (United States)

    2012-09-06

    ... recently-filed Postal Service filing addressing a new International Business Reply Service Contract 3. It... contract within the International Business Reply Service (IBRS) Competitive Contract 3 grouping.\\1\\ The... Service Filing of a Functionally Equivalent International Business Reply Service Competitive Contract 3...

  17. Corrective justice and contract law

    Directory of Open Access Journals (Sweden)

    Martín Hevia

    2010-06-01

    Full Text Available This article suggests that the central aspects of contract law in various jurisdictions can be explained within the idea of corrective justice. The article is divided into three parts. The first part distinguishes between corrective justice and distributive justice. The second part describes contract law. The third part focuses on actions for breach of contract and within that context reflects upon the idea of corrective justice.

  18. 29 CFR 4.110 - What contracts are covered.

    Science.gov (United States)

    2010-07-01

    ...'Hara Service Contract Act Covered Contracts Generally § 4.110 What contracts are covered. The Act... mean that the contract is not within the coverage of the Act. The amount of the contract is not determinative of the Act's coverage, although the requirements are different for contracts in excess of $2,500...

  19. The Public Sector and Obligation to Contract

    DEFF Research Database (Denmark)

    Olesen, Karsten Naundrup; Indén, Tobias

    2016-01-01

    The paper concerns the situation where public sector bodies are forced to enter into contracts. These obligations to contract are analysed from two angles. First, the paper offers an analysis of the reasons for imposing such obligations to contract under Swedish and Danish law. Secondly the paper...... discusses some consequences of the public entities’ obligations to contract, more specific consequences for the use of rules that usually regulate contracts and the fact that obligations to contract imposed on public entities establish a new market and at the same time the obligations deprive the entities...... of the freedom to contract which is a fundamental to market behaviour. Finally attention is drawn to the fact that obligations to contract are also imposed on private entities. The paper takes Swedish and Danish regulations as a point of departure and provides an insight into regulations from these two countries...

  20. Terms of payment in the sales contract

    OpenAIRE

    Harmáčková, Iva

    2009-01-01

    This thesis makes an analysis of price and terms of payment in the sales contract. Both elements are conceived in terms of legal framework and in terms of importance for the parties to an international sales contract. The theoretical part deals with the role of the sales contract in business relations, structure and legal norms of the international sales contract. The practical part includes an analysis of specific international sales contract.

  1. Outsourcing Contract Success: A Quality Management Perspective

    OpenAIRE

    Vanita Yadav; B.A. Metri

    2010-01-01

    Despite the phenomenal growth in outsourcing of various business functions like Enterprise Systems outsourcing, IT outsourcing, and Business Process outsourcing, there has been relatively less attention given to the high-risk area of outsourcing contracts. In this regard, contract has been the conventional medium for governing outsourcing relationships. This study aims to bring forward the importance of quality in the entire contracting process, involving contract planning, pre-contract negot...

  2. Contract Design: Risk Management and Evaluation

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial dependence of the agent’s returns on the provider’s gain level. Integrated care systems as well as accountable care organisations (ACOs in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced.  Methods: Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting.  Results: Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods

  3. Comparative analysis of JKR Sarawak form of contract and Malaysia Standard form of building contract (PWD203A)

    Science.gov (United States)

    Yunus, A. I. A.; Muhammad, W. M. N. W.; Saaid, M. N. F.

    2018-04-01

    Standard form of contract is normally being used in Malaysia construction industry in establishing legal relation between contracting parties. Generally, most of Malaysia federal government construction project used PWD203A which is a standard form of contract to be used where Bills of Quantities Form Part of the Contract and it is issued by Public Works Department (PWD/JKR). On the other hand in Sarawak, the largest state in Malaysia, the state government has issued their own standard form of contract namely JKR Sarawak Form of Contract 2006. Even both forms have been used widely in construction industry; there is still lack of understanding on both forms. The aim of this paper is to identify significant provision on both forms of contract. Document analysis has been adopted in conducting an in-depth review on both forms. It is found that, both forms of contracts have differences and similarities on several provisions specifically matters to definitions and general; execution of the works; payments, completion and final account; and delay, dispute resolution and determination.

  4. Construction contracts law and management

    CERN Document Server

    Hughes, Will; Murdoch, John

    2015-01-01

    The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.

  5. Contraction of the solar nebula

    International Nuclear Information System (INIS)

    Rawal, J.J.

    1984-01-01

    The concept of Roche limit is applied to the Laplacian theory of the origin of the solar system to study the contraction of a spherical gas cloud (solar nebula). In the process of contraction of the solar nebula, it is assumed that the phenomenon of supersonic turbulent convection is operative and brings about the halt at various stages of contraction. It is found that the radius of the contracting solar nebula follows the Titius-Bode law. The consequences of the relation are also discussed. The aim is to attempt to explain, on the basis of the concept of Roche limit, the distribution of planets in the solar system and try to understand the physics underlying it. (Auth.)

  6. 48 CFR 632.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Unusual contract financing. 632.114 Section 632.114 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 632.114 Unusual contract financing. The...

  7. 48 CFR 2432.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Unusual contract financing... DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 2432.114 Unusual contract financing. The Senior Procurement Executive is the agency head for the purpose of...

  8. 77 FR 71642 - New International Mail Contract

    Science.gov (United States)

    2012-12-03

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a... Services 3 contract. This document invites public comments on the request and addresses several related... Expedited Package Services (GEPS) 3 contract (Contract).\\1\\ The Notice was filed in accordance with 39 CFR...

  9. 77 FR 5280 - Service Contracts Inventory

    Science.gov (United States)

    2012-02-02

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0023] Service Contracts Inventory AGENCY: Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2011. The inventory includes service contract actions over $25,000 that were awarded in FY 2011. ADDRESSES...

  10. 78 FR 10642 - Service Contracts Inventory

    Science.gov (United States)

    2013-02-14

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0029] Service Contracts Inventory AGENCY: Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2012. The inventory includes service contract actions over $25,000 that were awarded in FY 2012. ADDRESSES...

  11. R and D contract management systems in the USA (Attachment); Beikoku ni okeru R and D contract kanri system (tenpu shiryohen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Presented herein is the attachment for 'R and D contract management systems in the USA'. The major contents include regulations governing the R and D contracts, procedures for the R and D contracts, financial procedures for the R and D contracts, procedures for the alternative R and D contracts, financial management of the R and D contracts, and activities for the management of the contract processes by electronic systems. (NEDO)

  12. Manipulation of Cash-Settled Futures Contracts.

    OpenAIRE

    Pirrong, Craig

    2001-01-01

    Replacement of delivery settlement of futures contracts with cash settlement is frequently proposed to reduce the frequency of market manipulation. This article shows that it is always possible to design a delivery-settled futures contract that is less susceptible to cornering by a large long than any given cash-settled contract. Such a contract is more susceptible to manipulation by large shorts, however. Therefore, cash settlement does not uniformly dominate delivery settlement as a means o...

  13. Energy conservation. Federal shared energy savings contracting

    International Nuclear Information System (INIS)

    Fultz, Keith O.; Milans, Flora H.; Kirk, Roy J.; Welker, Robert A.; Sparling, William J.; Butler, Sharon E.; Irwin, Susan W.

    1989-04-01

    A number of impediments have discouraged federal agencies from using shared energy savings contracts. As of November 30, 1988, only two federal agencies - the U.S. Postal Service (USPS) and the Department of the Army -had awarded such contracts even though they can yield significant energy and cost savings. The three major impediments we identified were uncertainty about the applicability of a particular procurement policy and practice, lack of management incentives, and difficulty in measuring energy and cost savings. To address the first impediment, the Department of Energy (DOE) developed a manual on shared energy savings contracting. The second impediment was addressed when the 100th Congress authorized incentives for federal agencies to enter into shared savings contracts. DOE addressed the third impediment by developing a methodology for calculating energy consumption and cost savings. However, because of differing methodological preferences, this issue will need to be addressed on a contract-by-contract basis. Some state governments and private sector firms are using performance contracts to reduce energy costs in their buildings and facilities. We were able to identify six states that were using performance contracts. Five have established programs, and all six states have projects under contract. The seven energy service companies we contacted indicated interest in federal shared energy savings contracting

  14. Contract engineers cut costs, and flexibility

    International Nuclear Information System (INIS)

    Bhargava, V.M.

    1991-01-01

    Today's rapid expansion of technology is an important reason for considering hiring contract engineering labor for your power plant because technical specialization is an important aspect of the contract engineering industry. This paper reports that another reason is addressing peak work loads. Any amount of technical assistance is available to assist in meeting schedules. Although a typical human resources department of a utility or architect/engineer may contain a few hundred active resumes, a contract engineering firm may have upwards of 40,000 resumes on file from all parts of the country. Because contract workers know that contract agencies keep abreast of client needs, they are more apt to forward updated resumes to such agencies. Used properly, a contract engineering company's services will augment the efforts of a human resources group and, in the case of some smaller companies, actually take the place of all internal recruiting efforts

  15. European contract law and the capabilities approach: on distributive responsibility for contract law

    NARCIS (Netherlands)

    Tjon Soei Len, L.; Weidtmann, N.; Hölzchen, Y.M.; Hawa, B.

    2012-01-01

    This paper argues that the normative requirements of Nussbaum’s capabilities approach extend to contract law (and private law more broadly). Contract law is part of a society’s basic structure, i.e. the responsibility bearing structure that is to secure and enhance individuals’ basic capabilities.

  16. IAEA research contracts. First annual report

    International Nuclear Information System (INIS)

    1961-01-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation

  17. IAEA research contracts. First annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1961-07-01

    The present volume is the first issue of what will become a regular annual publication by the Agency. It contains summaries of the final reports on all those contracts which have expired before 31 December 1960 with a few exceptions. In every case, the summary of the contractor's final report has been prepared by that member of the Agency's scientific staff who has been closely connected with that particular subject of research. Thus, the scientific data reported in the summary remain the responsibility of the contractor, the Agency being responsible for any additional observations. The reports of the following contracts are included: Research Contract No.2, The investigation of electrophysiological responses of biological systems, in particular of nerve cells, to irradiation with small doses of X-ray and other types of ionizing radiation, Research Contract No.3, Investigation on the mode of the protective action of certain sulfhydryl compounds against radiation effects on the synthesis of deoxyribonucleic acid, using tritium-labelled thymidine, Research Contract No.6, Investigation and development of a new method of monitoring and dosimetry for low fluxes of fast neutrons, involving the use of a bubble chamber, Research Contract No.13, Effects of incorporated radioisotopes upon the stability of genetic materials, Research Contract No.16, Interrelationship of root absorption and leaf absorption of radioisotopes in herbaceous plants, Research Contract No. 23, The uptake of radioactive wastes by lowland rice from contaminated soils due to irrigation water and its decontamination, Research Contract No.28, Comparison between mutation rates induced by acute and chronic gamma irradiation.

  18. Quality management and quality assurance contracts

    International Nuclear Information System (INIS)

    Teichler, M.

    1991-01-01

    Quality assurance contracts belong to the most important instruments of quality management systems. As a result of such contracts, quality control is to be done not only by the buyer, but is made a task to be fulfilled by the manufacturer. The author of the article shows that quality assurance contracts do change the contractual relationship between supplier and buyer, but have no effect on economic and practical conditions. This is so because quality assurance contracts apply only to warranty claims, which play a subordinate role in the legal relationship between producer and buyer, or producer and consumer, as compared to the claims for damages arising out of the contracts. (orig.) [de

  19. 48 CFR 432.007 - Contract financing payments.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING 432.007 Contract financing payments. The HCA may prescribe, on a case-by-case basis, a shorter period for financing payments. [61 FR 53646, Oct. 15, 1996. Redesignated...

  20. 48 CFR 970.0470-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0470... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Administrative Matters 970.0470-2 Contract clause. The contracting officer shall insert the clause at 970.5204-2, Laws, Regulations, and DOE...

  1. 48 CFR 970.0371-9 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0371... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0371-9 Contract clause. The contracting officer shall insert the clause at 970...

  2. 48 CFR 970.1103-4 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.1103... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1103-4 Contract clause. Insert the clause at 48 CFR 52.211-5, Material Requirements, in solicitations and contracts. ...

  3. 48 CFR 970.0370-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0370... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Improper Business Practices and Personal Conflicts of Interest 970.0370-2 Contract clause. (a) The contracting officer shall insert the clause at 970...

  4. 48 CFR 970.1170-2 - Contract provision.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract provision. 970... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Describing Agency Needs 970.1170-2 Contract provision. The Contracting Officer shall insert the clause at 970.5211-1, Work authorization, in each...

  5. Proposal for the award of three contracts for the provision of temporary labour on the Swiss part of the CERN site

    CERN Document Server

    2002-01-01

    This document concerns the award of three contracts for the provision of temporary labour on the Swiss part of the CERN site. Following a market survey carried out among 71 firms in thirteen Member States, a call for tenders (IT-2875/HR) was sent on 11 July 2001 to nine firms and six consortia, one consisting of three firms, five consisting of two firms, in eight Member States. By the closing date, CERN had received 12 tenders from eight firms and four consortia in five Member States. The Finance Committee is invited to agree to the negotiation of three contracts for the provision of temporary labour on the Swiss part of the CERN site with CONSULTOR (PL), ADECCO (CH) and FLEX-FORCE (CH)/TEMP-TEAM (NO). The total maximum amount for all three contracts is, for an initial period of three years starting 1 July 2002, 5 500 000 Swiss francs, subject to revision for inflation from 1 January 2003. The contracts will include an option for two further one-year extensions beyond the initial three-year period. The firms ...

  6. Psychological Contracts: Are They Still Relevant?

    Science.gov (United States)

    Maguire, Heather

    2002-01-01

    Empirical evidence from a banking organization illustrated how change has an impact on psychological contracts. Concluded that maintenance of contracts makes an important contribution to relationships but organizations need to adjust psychological contracts to meet the needs of the work force. (Contains 58 references.) (JOW)

  7. 24 CFR 232.605 - Contract requirements.

    Science.gov (United States)

    2010-04-01

    ... URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the...

  8. 48 CFR 2432.908 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... Section 2432.908 Federal Acquisition Regulations System DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Prompt Payment 2432.908 Contract clauses. (c)(1) The... other than the submission of an invoice or voucher, e.g., directly from proceeds of property sales. [71...

  9. 75 FR 82095 - Service Contracts Inventory

    Science.gov (United States)

    2010-12-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0394] Service Contracts Inventory AGENCY: U.S. Nuclear...) is providing for public information its Inventory of Contracts for Services for Fiscal Year (FY) 2010. The inventory includes service contract actions over $25,000 that were awarded in FY 2010. ADDRESSES...

  10. 78 FR 55124 - Domestic Mail Contract

    Science.gov (United States)

    2013-09-09

    ... Contract AGENCY: Postal Regulatory Commission. ACTION: Notice. SUMMARY: The Commission is noticing a recent Postal Service filing seeking to add Parcel Select Contract 7 to the competitive product list. This... Postal Service filed a formal request and associated supporting information to add Parcel Select Contract...

  11. 48 CFR 704.404 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 704.404... ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 704.404 Contract clause. If the contract involves access to classified (“Confidential”, “Secret”, or “Top Secret”), or administratively...

  12. 48 CFR 819.709 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 819.709... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 819.709 Contract clause. The contracting officer shall insert VAAR clause 852.219-9, Small Business Subcontracting Plan Minimum...

  13. 48 CFR 244.403 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clause. 244.403... OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 244.403 Contract clause. (1) 252.225-7009, Restriction on Acquisition of...

  14. Contractibility of financial statement information prepared under IFRS: Evidence from debt contracts around IFRS adoption

    OpenAIRE

    Shivakumar, L; Ball, R; Li, X

    2015-01-01

    We outline several properties of IFRS that potentially affect the contractibility or the transparency of financial statement information, and hence the use of that information in debt contracts. Those properties include the increased choice among accounting rules IFRS gives to managers, enhanced rule-making uncertainty, and increased emphasis on fair value accounting. Consistent with reduced contractibility of IFRS financial statement information, we find a significant reduction in accounting...

  15. R and D contract management systems in the USA (Attachment); Beikoku ni okeru R and D contract kanri system (tenpu shiryohen)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-02-01

    Presented herein is the attachment for 'R and D contract management systems in the USA'. The major contents include regulations governing the R and D contracts, procedures for the R and D contracts, financial procedures for the R and D contracts, procedures for the alternative R and D contracts, financial management of the R and D contracts, and activities for the management of the contract processes by electronic systems. (NEDO)

  16. Can we still comply with the maximum limit of 2°C? Approaches to a New Climate Contract

    Directory of Open Access Journals (Sweden)

    F. J. Radermacher

    2014-10-01

    Full Text Available The international climate policy is in trouble. CO2 emissions are rising instead of shrinking. The 2025 climate summit in Paris should lead to a global agreement, but what should be its design? In an earlier paper in Cadmus on the issue, the author outlined a contract formula based on the so-called ‘Copenhagen Accord’ that is based on a dynamic cap and an intelligent burden sharing between politics and the private sector. The private sector was brought into the deal via the idea of a voluntary climate neutrality of private emissions culminating in a ‘Global Neutral’ promoted by the United Nations. All this was based on a global cap-and-trade system. For a number of reasons, it may be that a global cap-and-trade system cannot or will not be established. States may use other instruments to fulfil their promises. The present paper elaborates that even under such conditions, the basic proposal can still be implemented. This may prove useful for the Paris negotiations.

  17. Contraction ionization waves in the argon contracted discharge

    International Nuclear Information System (INIS)

    Golubovskij, Yu.B.; Kulikov, V.V.; Nekutchaev, V.O.

    1985-01-01

    An investigation of ionization waves in the argon contracted discharge and a definition of their arising propagation mechanism accounting for the specificity of elementary pocesses characteristic of argon are presented. (author)

  18. 48 CFR 2832.114 - Unusual contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Unusual contract financing... Contracting Requirements CONTRACT FINANCING Non-Commercial Item Purchase Financing 2832.114 Unusual contract financing. The HCA, or designee at a level not lower than the BPC, is the official authorized to approve...

  19. 48 CFR 970.0808-3 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 970.0808... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Required sources of supplies and services 970.0808-3 Contract clause. The contracting officer shall insert the clause at 970.5208-1, Printing, in all...

  20. 48 CFR 32.501-3 - Contract price.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract price. 32.501-3... REQUIREMENTS CONTRACT FINANCING Progress Payments Based on Costs 32.501-3 Contract price. (a) For the purpose of making progress payments and determining the limitation on progress payments, the contract price...

  1. Contract Dynamics : Lessons from Empirical Analyses

    OpenAIRE

    Magali Chaudey

    2010-01-01

    Working paper GATE 2010-35; The recognition that contracts have a time dimension has given rise to a very abundant literature since the end of the 1980s. In such a dynamic context, the contract may take place over several periods and develop repeated interactions. Then, the principal topics of the analysis are commitment, reputation, memory and the renegotiation of the contract. Few papers have tried to apply the predictions of dynamic contract theory to data. The examples of applications int...

  2. Population-based contracting (population health): part II.

    Science.gov (United States)

    Jacofsky, D J

    2017-11-01

    Modern healthcare contracting is shifting the responsibility for improving quality, enhancing community health and controlling the total cost of care for patient populations from payers to providers. Population-based contracting involves capitated risk taken across an entire population, such that any included services within the contract are paid for by the risk-bearing entity throughout the term of the agreement. Under such contracts, a risk-bearing entity, which may be a provider group, a hospital or another payer, administers the contract and assumes risk for contractually defined services. These contracts can be structured in various ways, from professional fee capitation to full global per member per month diagnosis-based risk. The entity contracting with the payer must have downstream network contracts to provide the care and facilities that it has agreed to provide. Population health is a very powerful model to reduce waste and costs. It requires a deep understanding of the nuances of such contracting and the appropriate infrastructure to manage both networks and risk. Cite this article: Bone Joint J 2017;99-B:1431-4. ©2017 The British Editorial Society of Bone & Joint Surgery.

  3. 48 CFR 2439.107 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... Departmental automated information systems or applications as they are defined in the clause. (b) The contracting officer shall insert the clause at 48 CFR 2452.239-71, Information Technology Virus Security, in... SPECIAL CATEGORIES OF CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY 2439.107 Contract clauses. (a) The...

  4. 48 CFR 12.210 - Contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract financing. 12.210... financing. Customary market practice for some commercial items may include buyer contract financing. The contracting officer may offer Government financing in accordance with the policies and procedures in part 32. ...

  5. 48 CFR 619.808 - Contract negotiation.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract negotiation. 619.808 Section 619.808 Federal Acquisition Regulations System DEPARTMENT OF STATE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Contracting with the Small Business Administration (The 8(a) Program) 619.808 Contract negotiation...

  6. 48 CFR 32.908 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ..., Prompt Payment for Fixed-Price Architect-Engineer Contracts, in solicitations and contracts that contain the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts. (1) As authorized in... specify a period longer than 7 days for constructive acceptance or constructive approval, if required to...

  7. 28 CFR 810.2 - Accountability contract.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Accountability contract. 810.2 Section... COLUMBIA COMMUNITY SUPERVISION: ADMINISTRATIVE SANCTIONS § 810.2 Accountability contract. (a) Your CSO will... accountability contract with CSOSA. (b) The CSO is responsible for monitoring your compliance with the conditions...

  8. Incentive contracts with unobservable competence levels

    DEFF Research Database (Denmark)

    Davis, Jerome; Keiding, Hans

    2008-01-01

    about the competence of the agent to fulfill the obligations of the contract. The agent offers a choice of contracts to the principal, thereby signalling agent competence to the principal, and there is no alternative reputation mechanism to the contract for the principal's bargaining strategy. It turns...

  9. 48 CFR 923.103 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 923.103... Contract clauses. Insert the clause at 952.223-78, Sustainable Acquisition Program, or its Alternate I, in all contracts under which the contractor operates Government-owned facilities or Government-owned...

  10. 77 FR 70849 - International Mail Contract

    Science.gov (United States)

    2012-11-27

    ... POSTAL REGULATORY COMMISSION [Docket No. R2013-2; Order No.1550] International Mail Contract... Service filing concerning a Type 2 rate adjustment in conjunction with a mail contract with China Post... Equivalent Agreement, November 15, 2012 (Notice). Contract history and scope. The Agreement is a successor to...

  11. 48 CFR 32.005 - Consideration for contract financing.

    Science.gov (United States)

    2010-10-01

    ... financing. 32.005 Section 32.005 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING 32.005 Consideration for contract financing. (a) Requirement. When a contract financing clause is included at the inception of a contract, there shall be no...

  12. 48 CFR 1316.405 - Cost-reimbursement incentive contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 1316.405 Section 1316.405 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 1316.405 Cost-reimbursement...

  13. 48 CFR 916.405 - Cost-reimbursement incentive contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Cost-reimbursement incentive contracts. 916.405 Section 916.405 Federal Acquisition Regulations System DEPARTMENT OF ENERGY CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 916.405 Cost-reimbursement...

  14. 48 CFR 709.507-2 - Contract clause.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clause. 709.507-2... PLANNING CONTRACTOR QUALIFICATIONS Organizational Conflicts of Interest 709.507-2 Contract clause. (a)-(b... after award of a contract, the clause found at 752.209-71 shall be inserted in all contracts whenever...

  15. Maximum stress estimation model for multi-span waler beams with deflections at the supports using average strains.

    Science.gov (United States)

    Park, Sung Woo; Oh, Byung Kwan; Park, Hyo Seon

    2015-03-30

    The safety of a multi-span waler beam subjected simultaneously to a distributed load and deflections at its supports can be secured by limiting the maximum stress of the beam to a specific value to prevent the beam from reaching a limit state for failure or collapse. Despite the fact that the vast majority of accidents on construction sites occur at waler beams in retaining wall systems, no safety monitoring model that can consider deflections at the supports of the beam is available. In this paper, a maximum stress estimation model for a waler beam based on average strains measured from vibrating wire strain gauges (VWSGs), the most frequently used sensors in construction field, is presented. The model is derived by defining the relationship between the maximum stress and the average strains measured from VWSGs. In addition to the maximum stress, support reactions, deflections at supports, and the magnitudes of distributed loads for the beam structure can be identified by the estimation model using the average strains. Using simulation tests on two multi-span beams, the performance of the model is evaluated by estimating maximum stress, deflections at supports, support reactions, and the magnitudes of distributed loads.

  16. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  17. Method Determining the Contents of the Contract

    Directory of Open Access Journals (Sweden)

    Agus Yudha Hernoko

    2017-03-01

    Full Text Available The contents of the contract are primarily determined by what the real mutually agreed upon by the parties. By interpreting some certain statements, in this case to determine its meaning, to be clear based on what the parties committed themselves. Why is the interpretation required? In facts, on the many cases provided a valuable lesson, how many commercial disputes arise when the performance of the contract. The dispute begins when the parties have a different understanding of the statement that they use in the contract. Indeed, businesses are very familiar with the business processes that they do, but at the time of the business process are set forth in the contract language and designed by those who do not understand the legal aspects of the contract, the contract can be ascertained open possibility for disputes. The power of contract binding (the contents of the agreement toward to the characteristic and the wide spectrum of the rights and obligations contractually, basically a contract represents the power of performance among others in order implementing the rights and obligations of the parties. As an instrument to understand the contract, the method of determining the content of the contract (e.g., through interpretation, autonomous and heteronomous factors, further can be used to assess the reciprocation of rights and obligations in a meaningful and proportional contractual relationship.

  18. 48 CFR 16.202 - Firm-fixed-price contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Firm-fixed-price contracts. 16.202 Section 16.202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 16.202 Firm-fixed-price...

  19. 48 CFR 1816.202 - Firm-fixed-price contracts.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Firm-fixed-price contracts. 1816.202 Section 1816.202 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 1816.202 Firm...

  20. Incentive contracts and time use

    OpenAIRE

    Tor Viking Eriksson; Jaime Ortega

    2011-01-01

    Empirical studies on incentive contracts have primarily been concerned with the effects on employees’ productivity and earnings. The productivity increases associated with such contracts may, however, come at the expense of quality of life at or outside work. In this paper we study the effect on the employees’ non-work activities, testing whether incentive contracts lead to a change in the allocation of time across work and non-work activities. In doing so, we distinguish between two effects,...

  1. Methodological remarks on contraction theory

    DEFF Research Database (Denmark)

    Jouffroy, Jerome; Slotine, Jean-Jacques E.

    Because contraction analysis stems from a differential and incremental framework, the nature and methodology of contraction-based proofs are significantly different from those of their Lyapunov-based counterparts. This paper specifically studies this issue, and illustrates it by revisiting some c...... classical examples traditionally addressed using Lyapunov theory. Even in these cases, contraction tools can often yield significantly simplified analysis. The examples include adaptive control, robotics, and a proof of convergence of the deterministic Extended Kalman Filter....

  2. On Permuting Cut with Contraction

    OpenAIRE

    Borisavljevic, Mirjana; Dosen, Kosta; Petric, Zoran

    1999-01-01

    The paper presents a cut-elimination procedure for intuitionistic propositional logic in which cut is eliminated directly, without introducing the multiple-cut rule mix, and in which pushing cut above contraction is one of the reduction steps. The presentation of this procedure is preceded by an analysis of Gentzen's mix-elimination procedure, made in the perspective of permuting cut with contraction. It is also shown that in the absence of implication, pushing cut above contraction doesn't p...

  3. 48 CFR 923.7003 - Contract clauses.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 923.7003... Efficiency, Renewable Energy Technologies, and Occupational Safety Programs 923.7003 Contract clauses. (a) A decision to include or not include environmental, safety and health clauses in DOE contracts shall be made...

  4. 14 CFR 145.217 - Contract maintenance.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Contract maintenance. 145.217 Section 145...) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.217 Contract maintenance. (a) A certificated repair station may contract a maintenance function pertaining to an article to an...

  5. A Contract That Manages Itself: The Time Has Arrived

    Science.gov (United States)

    2015-02-01

    technology inspires contracting. The Smart Contract The paradigm of a contract as a static document is about to change. The days of a contract being read...efficiency is of paramount importance in order for an organization to perform its mission. The Smart Contract as an Object In discussions about...the contract object ( smart contract ) exists, the contract will be able to interact with other objects. That will enable the contract to know how

  6. A survey of formal languages for contracts

    DEFF Research Database (Denmark)

    Hvitved, Tom

    2010-01-01

    In this short paper we present the current status on formal languages and models for contracts. By a formal model is meant an unambiguous and rigorous representation of contracts, in order to enable their automatic validation, execution, and analysis — activates that are collectively referred...... to as contract lifecycle management (CLM). We present a set of formalism requirements, which represent features that any ideal contract model should support, based on which we present a comparative survey of existing contract formalisms....

  7. Avoiding surety contracts in bankruptcy procedure

    Directory of Open Access Journals (Sweden)

    Hiber Dragor

    2015-01-01

    Full Text Available Serbia's courts jurisprudence has divergent attitudes with respect to the dilemma whether a surety contract represents a contract without consideration, which may be avoided once the guarantor is subject to bankruptcy procedure without any additional conditions, or an onerous contract. Whether a surety contract is an onerous one has anyhow been disputed in the legal theory. One school of thought considers this contract as non-onerous one, since vis-a-vis guarantor's obligation no benefit to be expected from the other contractual party (i. e. creditor exists. The other school of thought understands surety (almost always as an onerous contract bearing in mind that the guarantor who enters into this contract does not have intentio liberalis. There are numerous and nuanced views based on analyses of the relation between a guarantor and a debtor focused on the argument that surety is a contract without consideration if intentio liberalis existed vis-a-vis main debtor rather than vis-a-vis creditor. Our legal literature did not pay much attention to that issue until recently. In a rare text dedicated to it the author's basic standpoint is that surety represents a contract without consideration. An exception, depending on the circumstances of the case, could be surety given by a parent company for the obligation of a subsidiary, provided the former reasonably expected a benefit in terms of an increase in the value of shares. Commercial courts followed such reasoning. In this article an opposite stance has been argued. Namely, the onerousness of surety must be assessed based on the relation between the guarantor and the main debtor rather than between the guarantor and the creditor. As a rule, surety is an onerous contract because the guarantor expects to collect from the debtor through subrogation the amount he paid to the creditor; exceptionally, surety may be a non-onerous contract if intentio liberalis existed vis-a-vis main debtor. However, this

  8. Next Indefinite Contract review exercise

    CERN Multimedia

    2015-01-01

    Dear Colleagues, We are pleased to inform you that the 2015 LD2IC exercise (selection process for the conversion of limited-duration contracts into indefinite contracts) has been officially launched. The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 3 August 2015 for a period of four weeks (until 31 August 2015). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions (FAQ) and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: We would like to remind you that all staff members holding a limited-duration contract who have successfully completed their probation period at the time of application and who meet the eligibility criteria in the vacancy notices (VNs) are eligible to apply for posts for the awa...

  9. Next Indefinite Contract review exercise

    CERN Multimedia

    HR Department

    2015-01-01

    Dear Colleagues, We are pleased to inform you that the 2015 LD2IC exercise (selection process for the conversion of limited-duration contracts into indefinite contracts) has been officially launched. The vacancy notices for posts opened with a view to the award of indefinite contracts will be published on 3 August 2015 for a period of four weeks (until 31 August 2015). The CERN Contract Review Boards (candidate interviews) will be held between the end of September and mid-November. The LD to IC procedure, Frequently Asked Questions (FAQ) and a calendar for the exercise are now available in the Admin e-guide. In addition, general information sessions on the procedure will be organised for candidates on the following dates: We would like to remind you that all staff members holding a limited-duration contract who have successfully completed their probation period at the time of application and who meet the eligibility criteria in the vacancy notices (VNs) are eligible to apply for posts for the award of a...

  10. 48 CFR 32.105 - Uses of contract financing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Uses of contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.105 Uses of contract financing. (a) Contract financing methods covered in this part are intended to be self-liquidating through...

  11. Contract Teachers in India

    Science.gov (United States)

    Goyal, Sangeeta; Pandey, Priyanka

    2013-01-01

    In this paper, we use non-experimental data from government schools in Uttar Pradesh and Madhya Pradesh, two of the largest Indian states, to present average school outcomes by contract status of teachers. We find that contract teachers are associated with higher effort than civil service teachers with permanent tenures, before as well as after…

  12. Contracting in a Foreign Country

    National Research Council Canada - National Science Library

    Rodeschin, Darrin

    1997-01-01

    .... This thesis investigates and compares the different contracting structures of the U.S. Army, the UN, and Apple as well as the duties and responsibilities of the contracting individuals within these organizations...

  13. Utility Energy Services Contracts Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-09-01

    The UESC Guide is a compilation of samples and templates developed as a resource to help contracting officers implement task orders for UESCs under existing U.S. General Services Administration areawide contracts.

  14. The effects of the contract-relax-antagonist-contract form of proprioceptive neuromuscular facilitation stretching on postural stability.

    Science.gov (United States)

    Ryan, Edwin E; Rossi, Mark D; Lopez, Richard

    2010-07-01

    To investigate the effects of the contract-relax-antagonist-contract (CRAC) form of proprioceptive neuromuscular facilitation (PNF) stretching, with and without a warm-up, on postural stability. Thirty volunteers (15 men and 15 women, age: 25.17 +/- 5.4 years, height: 173.76 +/- 8.2 cm, and weight: 72.03 +/- 14.87 kg) were randomly assigned to 1 of 3 conditions: warm-up and stretch (WS), stretching only (SO), and a control condition (CON). Contract-relax-antagonist-contract PNF of the hamstrings, plantar flexors, and hip flexors was performed during WS and SO. A 6-minute treadmill warm-up was applied before CRAC in the WS condition. Measures of anterior/posterior and medial/lateral (M/L) postural stability were taken before and after treatment conditions. A 2 x 3 analysis of variance was used to assess for differences between conditions. Significance was set at p Contract-relax-antagonist-contract form of stretching is a useful protocol for improving M/L stability.

  15. Termination of Commercial Contracts by giving Notice

    DEFF Research Database (Denmark)

    Edlund, Hans Henrik

    2008-01-01

    Some long-term contracts are brought to an end if one of the parties gives notice. Usually, such a step is not considered a breach of contract. It causes the contract to end in accordance with the contract. When no express rules cover the situation, it is often not entirely clear whether or not t...

  16. 48 CFR 11.701 - Supply contracts.

    Science.gov (United States)

    2010-10-01

    ... DESCRIBING AGENCY NEEDS Variation in Quantity 11.701 Supply contracts. (a) A fixed-price supply contract may authorize Government acceptance of a variation in the quantity of items called for if the variation is... items in a fixed-price contract, within allowable variations, if any. If a contractor delivers a...

  17. 32 CFR 37.1330 - Procurement contract.

    Science.gov (United States)

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...

  18. Managing the risks associated with natural gas purchase contracts

    International Nuclear Information System (INIS)

    Brett, T.

    2003-01-01

    This presentation described different styles of gas contracts. When markets opened in 1986, many contracts were between end users and producers, and a few marketers. Typically, contracts were for a fixed price and term. In 1990, when gas futures contracts began trading on NYMEX, contracts began to have floating prices, and prices linked to NYMEX prices. Standard gas contracts were developed in the mid-late 1990s. This paper described the differences between plain retail gas contracts, retail gas contracts between mass marketers and end users, wholesale contracts, contracts between producers and marketers, transportation contracts and domestic contracts. Both contracting parties obtain business and legal advice from consultants and lawyers with knowledge in energy transactions. Master agreement contracts were also described with reference to the Gas EDI contract. Examples of changing regulatory requirements were also outlined along with some traps to avoid. Bundled transportation agreements are standard documents that can be negotiated in special circumstances to charge customers who fail to deliver. They should be considered as tariffs

  19. Contract Farming: Conceptual Framework and Indian Panorama

    Directory of Open Access Journals (Sweden)

    Amit Kumar Chakrabarty

    2015-01-01

    Full Text Available This paper deals with conceptual framework of contract farming and portrays Indian scenario especially after announcement of National Agricultural Policy (2000 which encouraged private participation through contract farming. The conception of contract farming is not new in India, but it gets momentum in the era of agricultural globalization, as an alternative method of farming. The study reveals that while contract farming can be effective in introducing new technologies and providing external inputs to farmers, danger lies in firms extending technologies that bring financial benefits in the short-term but result in negative long-term health and environmental impacts. Contract farming is not appropriate for all types of crops. To have a significant poverty impact, crops produced under contract farming should be labour-intensive rather than input-intensive and should be appropriate for production on small plots of land. Since the contracting company is financially stronger than individual farmers, the terms of the contract may go against the farmers. Herein the government will have to come forward.

  20. Mechanical analysis of single myocyte contraction in a 3-D elastic matrix.

    Directory of Open Access Journals (Sweden)

    John Shaw

    Full Text Available Cardiac myocytes experience mechanical stress during each heartbeat. Excessive mechanical stresses under pathological conditions cause functional and structural remodeling that lead to heart diseases, yet the precise mechanisms are still incompletely understood. To study the cellular and molecular level mechanotransduction mechanisms, we developed a new 'cell-in-gel' experimental system to exert multiaxial (3-D stresses on a single myocyte during active contraction.Isolated myocytes are embedded in an elastic hydrogel to simulate the mechanical environment in myocardium (afterload. When electrically stimulated, the in-gel myocyte contracts while the matrix resists shortening and broadening of the cell, exerting normal and shear stresses on the cell. Here we provide a mechanical analysis, based on the Eshelby inclusion problem, of the 3-D strain and stress inside and outside the single myocyte during contraction in an elastic matrix.(1 The fractional shortening of the myocyte depends on the cell's geometric dimensions and the relative stiffness of the cell to the gel. A slender or softer cell has less fractional shortening. A myocyte of typical dimensions embedded in a gel of similar elastic stiffness can contract only 20% of its load-free value. (2 The longitudinal stress inside the cell is about 15 times the transverse stress level. (3 The traction on the cell surface is highly non-uniform, with a maximum near its ends, showing 'hot spots' at the location of intercalated disks. (4 The mechanical energy expenditure of the myocyte increases with the matrix stiffness in a monotonic and nonlinear manner.Our mechanical analyses provide analytic solutions that readily lend themselves to parametric studies. The resulting 3-D mapping of the strain and stress states serve to analyze and interpret ongoing cell-in-gel experiments, and the mathematical model provides an essential tool to decipher and quantify mechanotransduction mechanisms in cardiac

  1. 41 CFR 109-27.102-50 - Systems contracting.

    Science.gov (United States)

    2010-07-01

    ...-INVENTORY MANAGEMENT 27.1-Stock Replenishment § 109-27.102-50 Systems contracting. Systems contracting may... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Systems contracting. 109-27.102-50 Section 109-27.102-50 Public Contracts and Property Management Federal Property Management...

  2. 7 CFR 1465.25 - Contract violations and termination.

    Science.gov (United States)

    2010-01-01

    .... (2) If NRCS terminates a contract due to breach of contract, or the participant voluntarily... 7 Agriculture 10 2010-01-01 2010-01-01 false Contract violations and termination. 1465.25 Section... ASSISTANCE Contracts § 1465.25 Contract violations and termination. (a) If NRCS determines that a participant...

  3. Capitation, contracts, and control

    International Nuclear Information System (INIS)

    McIsaac, L.H.

    1987-01-01

    The radiology business manager in today's environment must become proficient in contract evaluations and negotiations. Health care is focusing on preventive medicine. Third-party payers are offering plans and programs to provide ''well-patient'' care. For prepaid (HMO-IPA-PTO) plans to succeed, demands for reduced fees and other entrepreneurial contractual arrangements are developed. This presentation will focus on specific items contained in most contracts. The issues of withhold, billing procedures, prompt-payment rewards, medical liability, capitation determinations, and modified capitation plans will be discussed. It is the intent of this presentation to share with the audience methods of evaluating contracts, the importance of negotiating specific terms, and an approach to determination of capitation amounts

  4. Amending Contracts for Choreographies

    Directory of Open Access Journals (Sweden)

    Laura Bocchi

    2011-07-01

    Full Text Available Distributed interactions can be suitably designed in terms of choreographies. Such abstractions can be thought of as global descriptions of the coordination of several distributed parties. Global assertions define contracts for choreographies by annotating multiparty session types with logical formulae to validate the content of the exchanged messages. The introduction of such constraints is a critical design issue as it may be hard to specify contracts that allow each party to be able to progress without violating the contract. In this paper, we propose three methods that automatically correct inconsistent global assertions. The methods are compared by discussing their applicability and the relationships between the amended global assertions and the original (inconsistent ones.

  5. Contract Design: The problem of information asymmetry

    Directory of Open Access Journals (Sweden)

    Axel C. Mühlbacher

    2018-01-01

    Full Text Available Introduction: Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries.  Methods: A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation.  Results: Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection and after conclusion of a contract (moral hazard.  Discussion and Conclusions: Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved

  6. Contract Design: The problem of information asymmetry.

    Science.gov (United States)

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation. Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete) contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection) and after conclusion of a contract (moral hazard). Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved at no-costs. The presented problems in the design of selective individual contracts

  7. Proposal to negotiate an amendment to an existing contract for the supply of superconducting wire for the LHC corrector magnets

    CERN Document Server

    2005-01-01

    This document concerns the proposal to negotiate an amendment to an existing contract for the supply of superconducting wire for the LHC corrector magnets. For the reasons explained in this document, the Finance Committee is invited to approve an amendment to an existing contract with the firm ALSTOM (FR) for the supply of an additional 1 270 km of superconducting wire (Types 1 and 2) for an amount of 257 549 euros (402 679 Swiss francs), subject to revision for inflation, bringing the total to a maximum amount of 2 814 170 euros (4 399 955 Swiss francs), subject to revision for inflation. The amounts in Swiss francs have been calculated using the present rate of exchange.

  8. Non-turnkey contract

    International Nuclear Information System (INIS)

    Shimoyama, Shunji

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face with troubles and difficulties during construction of the first nuclear power station, she might have chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf. (orig./FW) [de

  9. Non-turnkey contract

    Energy Technology Data Exchange (ETDEWEB)

    Shimoyama, S

    1975-01-01

    A turnkey contract is recommended to such a country which is in the initial stage of nuclear power development with respect to a few plants being constructed earlier. The prime contractor may not necessarily be a reactor supplier. In some cases an architect engineering company may be a contractor. If this arrangement is not possible and the contract had to be a non-turnkey type, there might be some advantage to such a developing country capable of undertaking some major portions of the project works. Even if she might face troubles and difficulties during construction of the first nuclear power station, she might have a chance of aquiring technical kowledge and experience which would later enable her to make the plant of her own manufacture. In such a case it is advisable to limit the number of main contracts as small as possible and to utilize an organization to assist the owner in project management or to assume this function in his behalf.

  10. Discharge characteristics of biceps brachii motor units at recruitment when older adults sustained an isometric contraction.

    Science.gov (United States)

    Pascoe, Michael A; Holmes, Matthew R; Enoka, Roger M

    2011-02-01

    The purpose of this study was to compare the discharge characteristics of motor units recruited during an isometric contraction that was sustained with the elbow flexor muscles by older adults at target forces that were less than the recruitment threshold force of each isolated motor unit. The discharge times of 27 single motor units were recorded from the biceps brachii in 11 old adults (78.8 ± 5.9 yr). The target force was set at either a relatively small (6.6 ± 3.7% maximum) or large (11.4 ± 4.5% maximum) difference below the recruitment threshold force and the contraction was sustained until the motor unit was recruited and discharged action potentials for about 60 s. The time to recruitment was longer for the large target-force difference (P = 0.001). At recruitment, the motor units discharged repetitively for both target-force differences, which contrasts with data from young adults when motor units discharged intermittently at recruitment for the large difference between recruitment threshold force and target force. The coefficient of variation (CV) for the first five interspike intervals (ISIs) increased from the small (18.7 ± 7.9) to large difference (35.0 ± 10.2%, P = 0.008) for the young adults, but did not differ for the two target force differences for the old adults (26.3 ± 14.7 to 24.0 ± 13.1%, P = 0.610). When analyzed across the discharge duration, the average CV for the ISI decreased similarly for the two target-force differences (P = 0.618) in old adults. These findings contrast with those of young adults and indicate that the integration of synaptic input during sustained contractions differs between young and old adults.

  11. Forward contract - minimize the exchange risk

    OpenAIRE

    Martin Maršík; František Vebr

    1998-01-01

    How can a Czech export (import) company hedge exchange risk? Some of the possibilities are these: 1/ use only CZK for foreign contracts; 2/ matching payments in the same or a parallel currency; 3/ use the products of the money markets; 4/ use the products of the forward market - FORWARD CONTRACT The forward market offers a forward contract to buy or sell a fixed amount of currency at a fixed price on a specific date in the future. The settlement of the contract is in more than two days. The e...

  12. Judges, commerce and contract law

    OpenAIRE

    Gava, John

    2010-01-01

    John Gava, Reader at Adelaide Law School, considers the question how should judges decide commercial cases, in particular, contract cases? He looks at the circumstances and impact of the use of contract law, with attention on common law contract and market needs. Published in Amicus Curiae – Journal of the Society for Advanced Legal Studies at the Institute of Advanced Legal Studies. The Journal is produced by SALS at the IALS (Institute of Advanced Legal Studies, School of Advanced Study, Un...

  13. Debt renegotiation with incomplete contract

    Directory of Open Access Journals (Sweden)

    Paulo de Melo Jorge Neto

    2005-09-01

    Full Text Available A debt contract usually does not include a provision about renegotiation. The right to seize the borrower’s asset and the rules of this process are usually stipulated in the contract. Such a promise not to renegotiate is not credible since renegotiation can mitigate the dead-weight loss of liquidating insolvent borrowers. Once the initial contract may not consider the renegotiation procedure and renegotiation may occur, this paper investigates why a complete contract is not offered. It shows that the lender does not need to stipulate the renegotiation procedure on the initial contract because he is indifferent about committing or not to the terms of a contract. This indicates that a complete contract gives the lender the same expected return as an incomplete contract, in which the renegotiation process is determined after the occurrence of default.Um contrato de débito geralmente não inclui uma cláusula sobre renegociação. O direito de liquidar os ativos do tomador e as regras do processo são habitualmente estipuladas no contrato. Tal promessa de não renegociar não é crível, já que a renegociação pode mitigar a perda bruta de se liquidar tomadores insolventes. Uma vez que o contrato inicial pode não considerar os procedimentos de renegociação, e esta pode, de fato, vir a ocorrer, este artigo investiga a razão de um contrato completo não ser ofertado. Mostra-se que o emprestador não precisa estipular os procedimentos de renegociação no contrato inicial porque ele é indiferente entre se comprometer ou não aos termos do contrato. Isto indica que um contrato completo dá ao emprestador o mesmo retorno esperado de um contrato incompleto, no qual os procedimentos de renegociação são determinados após a declaração de default.

  14. 48 CFR 1816.307-70 - NASA contract clauses.

    Science.gov (United States)

    2010-10-01

    ... officer may insert a clause substantially as stated at 1852.216-87, Submission of Vouchers for Payment, in... ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 1816.307-70... clause at 1852.216-75, Payment of Fixed Fee, in cost-plus-fixed-fee contracts. Modifications to the...

  15. 29 CFR 6.4 - Subpoenas (Service Contract Act).

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Subpoenas (Service Contract Act). 6.4 Section 6.4 Labor... STANDARDS IN FEDERAL AND FEDERALLY ASSISTED CONSTRUCTION CONTRACTS AND FEDERAL SERVICE CONTRACTS General § 6.4 Subpoenas (Service Contract Act). All applications under the Service Contract Act for subpoenas ad...

  16. Social comparison and perceived breach of psychological contract: their effects on burnout in a multigroup analysis.

    Science.gov (United States)

    Cantisano, Gabriela Topa; Domínguez, J Francisco Morales; García, J Luis Caeiro

    2007-05-01

    This study focuses on the mediator role of social comparison in the relationship between perceived breach of psychological contract and burnout. A previous model showing the hypothesized effects of perceived breach on burnout, both direct and mediated, is proposed. The final model reached an optimal fit to the data and was confirmed through multigroup analysis using a sample of Spanish teachers (N = 401) belonging to preprimary, primary, and secondary schools. Multigroup analyses showed that the model fit all groups adequately.

  17. Contraction of graded su(2) algebra

    International Nuclear Information System (INIS)

    Patra, M.K.; Tripathy, K.C.

    1989-01-01

    The Inoenu-Wigner contraction scheme is extended to Lie superalgebras. The structure and representations of extended BRS algebra are obtained from contraction of the graded su(2) algebra. From cohomological consideration, we demonstrate that the graded su(2) algebra is the only superalgebra which, on contraction, yields the full BRS algebra. (orig.)

  18. 77 FR 26583 - International Mail Contract

    Science.gov (United States)

    2012-05-04

    ... neither the fundamental service that it is offering nor the fundamental structure of the contract. Id. at..., the relevant characteristics of this GREP contract are similar, if not the same, as the relevant characteristics of the contract filed in Docket No. CP2010-36. Id. at 4. The Postal Service concludes that its...

  19. 10 CFR 603.1300 - Procurement contract.

    Science.gov (United States)

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  20. An investigation of the neural circuits underlying reaching and reach-to-grasp movements: from planning to execution.

    Directory of Open Access Journals (Sweden)

    Chiara eBegliomini

    2014-09-01

    Full Text Available Experimental evidence suggests the existence of a sophisticated brain circuit specifically dedicated to reach-to-grasp planning and execution, both in human and non human primates (Castiello, 2005. Studies accomplished by means of neuroimaging techniques suggest the hypothesis of a dichotomy between a reach-to-grasp circuit, involving the intraparietal area (AIP, the dorsal and ventral premotor cortices (PMd and PMv - Castiello and Begliomini, 2008; Filimon, 2010 and a reaching circuit involving the medial intraparietal area (mIP and the Superior Parieto-Occipital Cortex (SPOC (Culham et al., 2006. However, the time course characterizing the involvement of these regions during the planning and execution of these two types of movements has yet to be delineated. A functional magnetic resonance imaging (fMRI study has been conducted, including reach-to grasp and reaching only movements, performed towards either a small or a large stimulus, and Finite Impulse Response model (FIR - Henson, 2003 was adopted to monitor activation patterns from stimulus onset for a time window of 10 seconds duration. Data analysis focused on brain regions belonging either to the reaching or to the grasping network, as suggested by Castiello & Begliomini (2008.Results suggest that reaching and grasping movements planning and execution might share a common brain network, providing further confirmation to the idea that the neural underpinnings of reaching and grasping may overlap in both spatial and temporal terms (Verhagen et al., 2013.