  1. RCRA, a state perspective: the buck should stop with us

    Energy Technology Data Exchange (ETDEWEB)

    McCall, III, M N

    1977-11-01

    The states must carry the ball of realizing the Resource Conservation and Recovery Act (RCRA); state agencies and the EPA can work together, though they don't always agree; adequate funding is absolutely necessary. The states' perspective of their role is threefold-regulation, assistance, and leadership, with maximum input into implementation. A National Governors' Association committee on waste management was established. Neither RCRA itself nor supporting committee reports allow definition of open dumps and sanitary landfills with other than traditional meaning. Conducting the open dump inventory should be the responsibility of the states, with financial support from EPA. The existence of state nonimportation laws should not preclude that state from receiving money for a hazardous waste program. The criteria for defining hazardous wastes must be realistic if an unmanageable list is to be avoided. State solid waste management agencies must provide aid to local government and private industry. The state-not EPA- is the best level of government to carry out an effective solid waste program. The Federal program should concentrate on resource and energy conservation, research and development, demonstration projects, establishing markets for recycled materials, and education and training programs. Planning should be coordinated through state agencies.

  2. RCRA corrective action program guide (Interim)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  3. A review of state regulations that exceed those of the federal Resource Conservation and Recovery Act (RCRA)

    International Nuclear Information System (INIS)

    Coutant, C.C.; Heckman, C.L.

    1988-04-01

    This report identifies and provides information on state hazardous waste management programs and regulations in states where the US Department of Energy (DOE) has facilities. The objective is to describe for the DOE defense program and its contractors how state requirements are more stringent than the federal regulations under the Resource Conservation and Recovery Act (RCRA). DOE defense programs are located in 13 of the 50 states. Most of these states have regulations that are essentially equivalent to the federal RCRA requirements as they existed prior to the 1984 amendments, but their regulations are, in most instances, more stringment than the federal requirements. Differences are both substantive and procedural, and they are summarized and tabulated herein. All but three of these 13 states have been granted Final Authorization from the US Environmental Protection Agency (EPA) to operate their own hazardous waste management program in accord with the federal RCRA program prior to the 1984 amendments; two of the three others have some stage of Interim Authorization. EPA currently administers all of the provisions of the 1984 amendments, including requirements for corrective action under Sect. 3004(u). Two states, Colorado and Tennessee, have been granted revisions to their Final Authorizations delegating responsibility for the hazardous wastes. Responsible state agencies (with appropriate telephone numbers) are indicated, as are the relevant laws and current regulatory statutes

  4. Establishing a regulatory framework for a RCRA corrective action program

    International Nuclear Information System (INIS)

    Krueger, J.W.

    1989-01-01

    Recently, the environmental community has become keenly aware of problems associated with integration of the demanding regulations that apply to environmental restoration activities. Once can not attend an EPA-sponsored conference on Superfund without hearing questions concerning the Resource, Conservation, and Recovery Act (RCRA) and the applicability of the National Contingency Plan (NCP) to sites that do not qualify for the National Priorities List (NPL). In particular, the U.S. Department of Energy (DOE) has been greatly criticized for its inability to define a comprehensive approach for cleaning up its hazardous waste sites. This article presents two decision flowcharts designed to resolve some of this confusion for DOE. The RCRA/CERCLA integration diagram can help the environmental manager determine which law applies and under what conditions, and the RCRA corrective action decision flowchart can guide the manager in determining which specific sections of RCRA apply to a RCRA-lead environmental restoration program

  5. 78 FR 25678 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Gwendolyn Gleaton, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA...

  6. 76 FR 6594 - Florida: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-02-07

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S...

  7. 77 FR 60963 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of the changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA... Johnson, Permits and State Programs Section, RCRA Programs and Materials Management Branch, RCRA Division...

  8. 78 FR 43842 - State of Kansas; Authorization of State Hazardous Waste Management Program

    Science.gov (United States)

    2013-07-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R07-RCRA-2013-0447; FRL-9833-6] State of Kansas; Authorization of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). EPA proposes to...

  9. 75 FR 76691 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Science.gov (United States)

    2010-12-09

    ...; Correction of Federal Authorization of the State's Hazardous Waste Management Program AGENCY: Environmental... to the State of Oregon's federally authorized RCRA hazardous waste management program. On January 7... changes the State of Oregon made to its federally authorized RCRA Hazardous Waste Management Program...

  10. 76 FR 6594 - North Carolina: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-02-07

    ... Carolina: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act... Section, RCRA Programs and Materials Management Branch, RCRA Division, U.S. Environmental Protection...

  11. HANFORD TANK FARM RESOURCE CONSERVATION and RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM

    International Nuclear Information System (INIS)

    KRISTOFZSKI, J.G.

    2007-01-01

    As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper

  12. 78 FR 79654 - Vermont: Proposed Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-12-31

    ...] Vermont: Proposed Authorization of State Hazardous Waste Management Program Revisions AGENCY... Docket ID No. EPA-R01- RCRA-2013-0554, by mail to Sharon Leitch, RCRA Waste Management and UST Section..., RCRA Waste Management and UST Section, Office of Site Remediation and Restoration (OSRR07-1), US EPA...

  13. 78 FR 32223 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-29

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2012-0821; 9817-5] Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental Protection Agency (EPA... changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). EPA...

  14. 78 FR 54200 - Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-09-03

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R03-RCRA-2012-0294; FRL-9900-37-Region3] Virginia: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... of revisions to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA...

  15. 75 FR 76633 - Oregon; Correction of Federal Authorization of the State's Hazardous Waste Management Program

    Science.gov (United States)

    2010-12-09

    ...; Correction of Federal Authorization of the State's Hazardous Waste Management Program AGENCY: Environmental... its federally authorized RCRA Hazardous Waste Management Program. These authorized changes included... with Conditionally Exempt Small Quality Generators (CESQG) waste is subject to RCRA used oil management...

  16. Achieving RCRA compliance in DOE defense waste management operations

    International Nuclear Information System (INIS)

    Frankhauser, W.A.; Shepard, M.D.

    1989-01-01

    The U.S. Department of Energy (DOE) generates significant volumes of radioactive mixed waste (RMW) through its defense-related activities. Defense RMW is co-regulated by DOE and the U.S. Environmental Protection Agency/State agencies in accordance with requirements of the Resource Conservation and Recovery Act (RCRA) and the Atomic Energy Act (AEA). This paper highlights some of the problems encountered in co-regulation and discusses achievements of the defense waste management program in integrating RCRA requirements into RMW operations. Defense waste sites are planning facility modifications and major new construction projects to develop treatment, storage and disposal capacity for existing RMW inventories and projected needs

  17. 75 FR 35720 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-06-23

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...: Robin Biscaia, RCRA Waste Management Section, Office of Site Remediation and Restoration (OSRR 07-1... Courier: Deliver your comments to: Robin Biscaia, RCRA Waste Management Section, Office of Site...

  18. RCRA facility stabilization initiative

    International Nuclear Information System (INIS)

    1995-02-01

    The RCRA Facility Stabilization Initiative was developed as a means of implementing the Corrective Action Program's management goals recommended by the RIS for stabilizing actual or imminent releases from solid waste management units that threaten human health and the environment. The overall goal of stabilization is to, as situations warrant, control or abate threats to human health and/or the environment from releases at RCRA facilities, and/or to prevent or minimize the further spread of contamination while long-term remedies are pursued. The Stabilization initiative is a management philosophy and should not be confused with stabilization technologies

  19. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention

  20. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL`s assessment of the need for further remedial attention.

  1. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention.

  2. Accelerating RCRA corrective action: The principles of the DOE approach

    International Nuclear Information System (INIS)

    Kimmell, T.A.; Green, D.R.; Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The US Department of Energy (DOE) is involved in the remediation of environmental contamination at many of its facilities under the Resource Conservation and Recovery Act (RCRA). RCRA's corrective action provisions were established by the Hazardous and Solid Waste Amendments of 1984 (HSWA). In response to the HSWA mandate, EPA established a program for the conduct of RCRA corrective action that was similar to that established under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). In addition, EPA developed and implemented its ''stabilization'' initiative as a means of quickly addressing immediate risks posed by releases until long term solutions can be applied. To improve the efficiency of environmental restoration at its facilities, DOE is developing guidance and training programs on accelerated environmental restoration under RCRA. A RCRA guidance document, entitled ''Accelerating RCRA Corrective Action at DOE Facilities,'' is currently being developed by DOE's Office of Environmental Policy and Assistance. The new guidance document will outline a decision-making process for determining if acceleration is appropriate for individual facilities, for identifying, evaluating, and selecting options for program acceleration, and for implementing selected acceleration options. The document will also discuss management and planning strategies that provide a firm foundation for accelerating RCRA corrective action. These strategies include a number of very basic principles that have proven effective at DOE and other federal facilities, as well as some new approaches. The purpose of this paper is to introduce DOE's new guidance document, discuss the general approach presented in the guidance for accelerating RCRA corrective action, and to emphasize some of the more important principles of effective management and planning

  3. 75 FR 43478 - Rhode Island: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-07-26

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental.... Mail: Robin Biscaia, RCRA Waste Management Section, Office of Site Remediation and Restoration (OSRR 07... Delivery or Courier: Deliver your comments to: Robin Biscaia, RCRA Waste Management Section, Office of Site...

  4. RCRA groundwater data analysis protocol for the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Chou, C.J.; Jackson, R.L.

    1992-04-01

    The Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring program currently involves site-specific monitoring of 20 facilities on the Hanford Site in southeastern Washington. The RCRA groundwater monitoring program has collected abundant data on groundwater quality. These data are used to assess the impact of a facility on groundwater quality or whether remediation efforts under RCRA corrective action programs are effective. Both evaluations rely on statistical analysis of groundwater monitoring data. The need for information on groundwater quality by regulators and environmental managers makes statistical analysis of monitoring data an important part of RCRA groundwater monitoring programs. The complexity of groundwater monitoring programs and variabilities (spatial, temporal, and analytical) exhibited in groundwater quality variables indicate the need for a data analysis protocol to guide statistical analysis. A data analysis protocol was developed from the perspective of addressing regulatory requirements, data quality, and management information needs. This data analysis protocol contains four elements: data handling methods; graphical evaluation techniques; statistical tests for trend, central tendency, and excursion analysis; and reporting procedures for presenting results to users

  5. Characterizing cemented TRU waste for RCRA hazardous constituents

    International Nuclear Information System (INIS)

    Yeamans, D.R.; Betts, S.E.; Bodenstein, S.A.

    1996-01-01

    Los Alamos National Laboratory (LANL) has characterized drums of solidified transuranic (TRU) waste from four major waste streams. The data will help the State of New Mexico determine whether or not to issue a no-migration variance of the Waste Isolation Pilot Plant (WIPP) so that WIPP can receive and dispose of waste. The need to characterize TRU waste stored at LANL is driven by two additional factors: (1) the LANL RCRA Waste Analysis Plan for EPA compliant safe storage of hazardous waste; (2) the WIPP Waste Acceptance Criteria (WAC) The LANL characterization program includes headspace gas analysis, radioassay and radiography for all drums and solids sampling on a random selection of drums from each waste stream. Data are presented showing that the only identified non-metal RCRA hazardous component of the waste is methanol

  6. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  7. 76 FR 26616 - Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2011-05-09

    ... Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection Agency (EPA... (RCRA) allows EPA to authorize States to operate their hazardous waste management programs in lieu of the Federal program. EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  8. Resource Conservation and Recovery Act (RCRA)

    International Nuclear Information System (INIS)

    1989-01-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ''Characterization of Hazardous Waste Sites'' has been liberally adapted for use in this RFI Program Plan

  9. Quarterly RCRA Groundwater Monitoring Data for the Period April Through June 2006

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.

    2006-11-01

    This report provides information about RCRA groundwater monitoring for the period April through June 2006. Seventeen RCRA sites were sampled during the reporting quarter. Sampled sites include seven monitored under groundwater indicator evaluation (''detection'') programs, eight monitored under groundwater quality assessment programs, and two monitored under final-status programs.

  10. Costs of RCRA corrective action: Interim report

    International Nuclear Information System (INIS)

    Tonn, B.; Russell, M.; Hwang Ho-Ling; Goeltz, R.; Warren, J.

    1991-09-01

    This report estimates the cost of the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) for all non-federal facilities in the United States. RCRA is the federal law which regulates the treatment, storage, disposal, and recovery of hazardous waste. The 1984 amendment to RCRA, known as the Hazardous and Solid Waste Amendments, stipulates that facilities that treat, store or dispose of hazardous wastes (TSDs) must remediate situations where hazardous wastes have escaped into the environment from their solid waste management units (SWMUs). The US Environmental Protection Agency (USEPA 1990a), among others, believes that the costs of RCRA corrective action could rival the costs of SUPERFUND. Evaluated herein are costs associated with actual remedial actions. The remedial action cost estimating program developed by CH2M Hill is known as the Cost of Remedial Action Model (CORA). It provides cost estimates, in 1987 dollars, by technology used to remediate hazardous waste sites. Rules were developed to categorize each SWMU in the RTI databases by the kinds of technologies that would be used to remediate them. Results were then run through CORA using various assumptions for variable values that could not be drawn from the RTI databases and that did not have CORA supplied default values. Cost estimates were developed under several scenarios. The base case assumes a TSD and SWMU universe equal to that captured in the RTI databases, a point of compliance at the SWMU boundary with no ability to shift wastes from SWMU to SWMU, and a best-as-practical clean-up to health-based standards. 11 refs., 12 figs., 12 tabs

  11. 75 FR 60398 - California: Proposed Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-09-30

    ...: Proposed Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... its hazardous waste management program by November 1, 2010. ADDRESSES: Submit your comments... waste management program. EPA continues to have independent enforcement authority under RCRA sections...

  12. 77 FR 59758 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection..., (RCRA), allows the Environmental Protection Agency (EPA) to authorize State hazardous waste management... codification of the authorized Idaho hazardous waste management program and incorporates by reference...

  13. 77 FR 65351 - Missouri: Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-26

    ...: Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental Protection Agency (EPA... Jackson-Johnson, Environmental Protection Agency, Waste Enforcement & Materials Management Branch, 11201... its hazardous waste program under the Resource Conservation and Recovery Act (RCRA). EPA proposes to...

  14. 76 FR 62303 - California: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-10-07

    ... State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION... the revisions to California's hazardous waste management program shall be effective at 1 p.m. on... implement the RCRA hazardous waste management program. EPA granted authorization for changes to California's...

  15. 77 FR 60919 - Tennessee: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-05

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental..., Division of Solid Waste Management, 5th Floor, L & C Tower, 401 Church Street, Nashville, Tennessee 37243... RCRA hazardous waste management program. We granted authorization for changes to Tennessee's program on...

  16. 75 FR 918 - Oregon: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-01-07

    ... Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA... hazardous waste management program under the Resource Conservation and Recovery Act, as amended (RCRA). On... has decided that the revisions to the Oregon hazardous waste management program satisfy all of the...

  17. 77 FR 61326 - Indiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-10-09

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... RCRA hazardous waste management program. We granted authorization for changes to their program on... 202. Hazardous Waste Management July 30, 2003; 68 329 IAC 3.1-6-2(16); System; Identification and FR...

  18. Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

  19. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    International Nuclear Information System (INIS)

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR section 261.4(a)(4), ''Identification and Listing of Hazardous Waste,'' as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues

  20. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR {section}261.4(a)(4), ``Identification and Listing of Hazardous Waste,`` as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues.

  1. 75 FR 50932 - Massachusetts: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2010-08-18

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...-1990. FOR FURTHER INFORMATION CONTACT: Robin Biscaia, RCRA Waste Management Section, Office of Site... final [[Page 50933

  2. 77 FR 47797 - Arkansas: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-08-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2010-0307; FRL-9713-2] Arkansas: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  3. 76 FR 19004 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-04-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2010-0307; FRL-9290-9] Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  4. 77 FR 38566 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-06-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA--R06-RCRA-2012-0367; FRL-9692-6] Louisiana: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  5. 78 FR 25579 - Georgia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-05-02

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... adopted these requirements by reference at Georgia Hazardous Waste Management Rule 391-3-11-.07(1), EPA... authorization of changes to its hazardous waste program under the Resource Conservation and Recovery Act (RCRA...

  6. 76 FR 37048 - Louisiana; Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2011-06-24

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2010-0307; FRL-9323-8] Louisiana; Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  7. 77 FR 15343 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-03-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R06-RCRA-2012-0054; FRL-9647-8] Oklahoma: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... authorization of the changes to its hazardous waste program under the Resource Conservation and Recovery Act...

  8. National RCRA Hazardous Waste Biennial Report Data Files

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA), in cooperation with the States, biennially collects information regarding the generation, management, and final disposition of hazardous wastes regulated under the Resource Conservation and Recovery Act of 1976 (RCRA), as amended. Collection, validation and verification of the Biennial Report (BR) data is the responsibility of RCRA authorized states and EPA regions. EPA does not modify the data reported by the states or regions. Any questions regarding the information reported for a RCRA handler should be directed to the state agency or region responsible for the BR data collection. BR data are collected every other year (odd-numbered years) and submitted in the following year. The BR data are used to support regulatory activities and provide basic statistics and trend of hazardous waste generation and management. BR data is available to the public through 3 mechanisms. 1. The RCRAInfo website includes data collected from 2001 to present-day (https://rcrainfo.epa.gov/rcrainfoweb/action/main-menu/view). Users of the RCRAInfo website can run queries and output reports for different data collection years at this site. All BR data collected from 2001 to present-day is stored in RCRAInfo, and is accessible through this website. 2. An FTP site allows users to access BR data files collected from 1999 - present day (ftp://ftp.epa.gov/rcrainfodata/). Zip files are available for download directly from this

  9. Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes

    International Nuclear Information System (INIS)

    2006-01-01

    The Performance Demonstration Program (PDP) for Resource Conservation and Recovery Act (RCRA) constituents distributes test samples for analysis of volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and metals in solid matrices. Each distribution of test samples is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD; DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department. The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the RCRA PDP. Participating laboratories demonstrate acceptable performance by successfully analyzing single-blind performance evaluation samples (subsequently referred to as PDP samples) according to the criteria established in this plan. PDP samples are used as an independent means to assess laboratory performance regarding compliance with the WAP quality assurance objectives (QAOs). The concentrations of analytes in the PDP samples address levels of regulatory concern and encompass the range of concentrations anticipated in waste characterization samples. The WIPP requires analyses of homogeneous solid wastes to demonstrate compliance with regulatory requirements. These analyses must be performed by laboratories that demonstrate acceptable performance in this PDP. These analyses are referred to as WIPP analyses, and the samples on which they are performed are referred to as WIPP samples. Participating laboratories must analyze PDP samples using the same procedures used for WIPP samples.

  10. 78 FR 70255 - West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-11-25

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R03-RCRA-2013-0571; FRL-9903-07-Region 3] West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY... final authorization of revisions to its hazardous waste program under the Resource Conservation and...

  11. 78 FR 15338 - New York: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-03-11

    ... authorization of changes to its hazardous waste program under the Solid Waste Disposal Act, as amended, commonly... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 271 [EPA-R02-RCRA-2013-0144; FRL-9693-3] New York: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental...

  12. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  13. An analysis of the CERCLA response program and the RCRA corrective action program in determining cleanup strategies for federal facilities which have been proposed for listing on the National Priorities List

    International Nuclear Information System (INIS)

    Baker, P.; Vinson, R.

    1994-01-01

    This document was prepared as an issue paper for the Department of Energy to serve in the decision-making process for environmental restoration activities. The paper compares cleanup requirements under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and those currently proposed under Subpart S of the Resource Conservation and Recovery Act (RCRA). The history and regulatory framework for both laws is discussed, and the process for environmental restoration actions under both regulatory programs is compared and contrasted. Contaminants regulated under CERCLA and RCRA differ significantly in that radioactive contaminants are subject to Environmental Protection Agency jurisdiction only under CERCLA. The DOE has the jurisdiction to implement radioactive waste management and cleanup levels under the Atomic Energy Act (AEA) at nuclear weapons facilities. For sites with significant amounts of contaminants which are radioactive only, cleanup under RCRA can present significant advantages, since the DOE can then manage restoration activities under its own authority. There are, conversely several significant advantages for a remedial action being conducted at a CERCLA site recognized on the National Priorities List (NPL). Other provisions in the CERCLA remediation and the RCRA corrective action process offer both advantages and disadvantages related to DOE environmental restoration programs. This paper presents a discussion of significant issues which should be considered in such negotiations

  14. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  15. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  16. Hazardous waste landfill research: U. S. E. P. A. (United States Environmental Protection Agency) Program

    Energy Technology Data Exchange (ETDEWEB)

    Schomaker, N.B.

    1984-06-01

    The hazardous waste land disposal research program is collecting data necessary to support implementation of disposal guidelines mandated by the 'Resource Conservation and Recovery Act of 1976' (RCRA) PL 94-580. This program relating to the categorical areas of landfills, surface impoundments, and underground mines encompasses state-of-the-art documents, laboratory analysis, economic assessment, bench and pilot studies, and full-scale field verification studies. Over the next five years the research will be reported as Technical Resource Documents in support of the RCRA Guidance Documents. These documents will be used to provide guidance for conducting the review and evaluation of land disposal permit applications. This paper will present an overview of this program and will report the current status of the work.

  17. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1995-01-01

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State's Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP's Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m 3 of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals

  18. RCRA corrective action and closure

    International Nuclear Information System (INIS)

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators' interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE's permitted facilities and interim status facilities

  19. Resource Conservation and Recovery Act (RCRA) new-employee training manual for the Operations Division RCRA personnel

    Energy Technology Data Exchange (ETDEWEB)

    Barkenbus, B.D.

    1987-03-01

    This manual has been prepared for the training of new employees who will work with RCRA hazardous waste management in the Operations Division. It will be taught by a person who is trained in hazardous waste regulations/procedures. It consists of nine modules. The topics of these modules are: RCRA Training, Hazardous Waste Regulations, Transportation Regulations, Hazardous Waste Management at ORNL, Chemical Hazards and Safety, Hazardous Waste Operations Training, Sampling of Hazardous Waste, Hazardous Waste Identification/Classification, and RCRA Contingency Plans and Emergency Procedures. The on-the-job training areas are identified in the modules. They are an integral part of training.

  20. Clues to interpretation of RCRA regulations

    International Nuclear Information System (INIS)

    Siebach, P.R.; Brown, P.H.

    1992-01-01

    Waste waters from industrial facilities are often treated at waste water treatment plants and then discharged to streams or rivers, or may be reused. Discharges of pollutants to waterways are regulated under the Clean Water Act, and require a permit. The Resource Conservation and Recovery Act (RCRA) regulates the management of solid wastes. This paper discusses the status of waste water treatment plant discharges and sludges pursuant to RCRA. It concludes that some exceptions to RCRA allow waste water treatment plants to accept dilute solvent mixtures, treat them, and discharge effluent without needing a RCRA permit. If residual sludges do not exhibit a hazardous characteristic, then they may be managed as nonhazardous solid waste. For DOE and other generators of mixed waste (both radioactive and hazardous), this may allow sludges to be managed as low level radioactive waste. (author)

  1. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  2. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  3. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  4. 75 FR 51392 - New York: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-08-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 272 [EPA-R02-RCRA-2010-0249; FRL-9178-8] New York: Incorporation by Reference of State Hazardous Waste Management Program Correction In rule document 2010-18927 beginning on page 45489 in the issue of Tuesday, August 3, 2010, make the following correction: Appendix A...

  5. When RCRA meets ALARA

    International Nuclear Information System (INIS)

    Kirner, N.P.

    1990-01-01

    This paper proposes a method to identify an inconsistency between RCRA and AEA and for distinguishing a true inconsistency from a compliance difficulty. The paper also provides examples of each situation, accommodating specific RCRA requirements to maintain adherence to radiation protection requirements. The proposed method is derived from radiation protection guidance to Federal agencies for occupational exposure that was issued by EPA, under authority derived from Executive Order 10831, the AEA, and Reorganization Plan No. 3 of 1970. This EPA guidance was approved by President Reagan on January 20, 1987 and closely reflects the guidance of national and international radiation standard-setting groups

  6. RCRA corrective action determination of no further action

    International Nuclear Information System (INIS)

    1996-06-01

    On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, 'Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities', would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action

  7. Interpreting the SARA and RCRA training requirements

    International Nuclear Information System (INIS)

    Moreland, W.M.; Wells, S.M.

    1987-01-01

    The Resource Conservation and Recovery Act (RCRA) and the Superfund Amendments and Reauthorization Act (SARA) promulgated by the EPA (RCRA) and the OSHA (SARA) require hazardous materials training for all individuals working with hazardous materials. Facilities that are involved in the generation, storage, treatment, transportation, or disposal/removal of hazardous materials/waste must comply with all relevant training regulations. Using the guidelines contained in the RCRA and SARA regulations, decisions must be made to determine: the type of regulatory requirement based on facility function (i.e., whether the facility is a RCRA or CERCLA facility). The type of training required for specific categories of workers (e.g. managers, supervisors, or general site workers). The level of training needed for each category of worker. This presentation outlines how the Environmental Compliance and Health Protection Technical Resources and Training Group, working with waste operations personnel, establishes specific training requirements

  8. Special Focus Areas for Hazardous Waste Cleanups under the Resource Conservation and Recovery Act (RCRA)

    Science.gov (United States)

    In order to manage the new and changing needs of the RCRA Corrective Action Program, EPA is constantly exploring program enhancements, alternate exposure pathways, and new technologies available to protect human health and environment.

  9. RCRA and CERCLA requirements affecting cleanup activities at a federal facility superfund site

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1994-01-01

    The Fernald Environmental Management Project (FEMP) achieved success on an integrated groundwater monitoring program which addressed both RCRA and CERCLA requirements. The integrated plan resulted in a cost savings of approximately $2.6 million. At present, the FEMP is also working on an integrated closure process to address Hazardous Waste Management Units (HWMUs) at the site. To date, Ohio EPA seems willing to discuss an integrated program with some stipulations. If an integrated program is implemented, a cost savings of several million dollars will be realized since the CERCLA documents can be used in place of a RCRA closure plan. The success of an integrated program at the FEMP is impossible without the support of DOE and the regulators. Since DOE is an owner/operator of the facility and Ohio EPA regulates hazardous waste management activities at the FEMP, both parties must be satisfied with the proposed integration activities. Similarly, US EPA retains CERCLA authority over the site along with a signed consent agreement with DOE, which dictates the schedule of the CERCLA activities. Another federal facility used RCRA closure plans to satisfy CERCLA activities. This federal facility was in a different US EPA Region than the FEMP. While this approach was successful for this site, an integrated approach was required at the FEMP because of the signed Consent Agreement and Consent Decree. For federal facilities which have a large number of HWMUs along with OUs, an integrated approach may result in a timely and cost-effective cleanup

  10. Superfund TIO videos. Set A. Regulatory overview - CERCLA's relationship to other programs: RCRA, Title III, UST, CWA, SDWA. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into five sections. Section 1 provides definitions and historical information on both the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The four types of RCRA regulatory programs - Subtitles C, D, I, and J - are described. Treatment, storage, and disposal (TSD) and recycling facilities are also discussed. Section 2 discusses the history behind the Emergency Planning and Community Right-to-Know Act (Title III). The four major provisions of Title III, which are emergency planning, emergency release notification, community right-to-know reporting, and the toxic chemical release inventory are covered. Section 3 outlines the UST program covering notification, record keeping, and the UST Trust Fund. Section 4 outlines the six major provisions of the Clean Water Act (CWA): water quality, pretreatment, prevention of oil and hazardous substance discharges, responses to oil and hazardous substance discharges, discharges of hazardous substances into the ocean, and dredge and fill. Section 5 explains the purpose, regulations, and standards of the Safe Drinking Water Act (SDWA). Specific issues such as underground injection, sole source aquifers, and lead contamination are discussed

  11. NGLW RCRA Storage Study

    International Nuclear Information System (INIS)

    Waters, R.J.; Ochoa, R.; Fritz, K.D.; Craig, D.W.

    2000-01-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning

  12. NGLW RCRA Storage Study

    Energy Technology Data Exchange (ETDEWEB)

    R. J. Waters; R. Ochoa; K. D. Fritz; D. W. Craig

    2000-06-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning.

  13. Strategy and field implementation for determining a dangerous waste mixture in Washington State

    International Nuclear Information System (INIS)

    Cowan, Steve; Foster, Rick; Wright, Jamie

    1992-01-01

    Under the Resource Conservation and Recovery Act (RCRA), states rather than the Environmental Protection Agency (EPA) maybe authorized to implement RCRA regulations. Under RCRA, environmental regulations implemented by an authorized state must be at least as stringent as those contained in RCRA. Compared to RCRA, the corresponding regulations of the State of Washington regarding the determination of characteristic wastes are more stringent and complex. This paper discusses the complexities of the regulations and presents a strategy for successfully managing diverse waste streams. This strategy was used during the cleanup of contaminated areas and equipment at the Albany Research Center (ARC) in Albany, Oregon, which processed uranium and thorium for the Manhattan Engineer District and the Atomic Energy Commission during the early days of the nation's atomic energy program. Wastes from the cleanup of ARC were shipped to the Department of Energy (DOE) Hanford Reservation. Because the DOE Hanford Reservation is located in Washington, this paper should be of interest to DOE waste generators. (author)

  14. Selective removal/recovery of RCRA metals from waste and process solutions using polymer filtration trademark technology

    International Nuclear Information System (INIS)

    Smith, B.F.

    1997-01-01

    Resource Conservation and Recovery Act (RCRA) metals are found in a number of process and waste streams at many DOE, U.S. Department of Defense, and industrial facilities. RCRA metals consist principally of chromium, mercury, cadmium, lead, and silver. Arsenic and selenium, which form oxyanions, are also considered RCRA elements. Discharge limits for each of these metals are based on toxicity and dictated by state and federal regulations (e.g., drinking water, RCRA, etc.). RCRA metals are used in many current operations, are generated in decontamination and decommissioning (D ampersand D) operations, and are also present in old process wastes that require treatment and stabilization. These metals can exist in solutions, as part of sludges, or as contaminants on soils or solid surfaces, as individual metals or as mixtures with other metals, mixtures with radioactive metals such as actinides (defined as mixed waste), or as mixtures with a variety of inert metals such as calcium and sodium. The authors have successfully completed a preliminary proof-of-principle evaluation of Polymer Filtration trademark (PF) technology for the dissolution of metallic mercury and have also shown that they can remove and concentrate RCRA metals from dilute solutions for a variety of aqueous solution types using PF technology. Another application successfully demonstrated is the dilute metal removal of americium and plutonium from process streams. This application was used to remove the total alpha contamination to below 30 pCi/L for the wastewater treatment plant at TA-50 at Los Alamos National Laboratory (LANL) and from nitric acid distillate in the acid recovery process at TA-55, the Plutonium Facility at LANL (ESP-CP TTP AL16C322). This project will develop and optimize the PF technology for specific DOE process streams containing RCRA metals and coordinate it with the needs of the commercial sector to ensure that technology transfer occurs

  15. Selective removal/recovery of RCRA metals from waste and process solutions using polymer filtration{trademark} technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, B.F. [Los Alamos National Lab., NM (United States)

    1997-10-01

    Resource Conservation and Recovery Act (RCRA) metals are found in a number of process and waste streams at many DOE, U.S. Department of Defense, and industrial facilities. RCRA metals consist principally of chromium, mercury, cadmium, lead, and silver. Arsenic and selenium, which form oxyanions, are also considered RCRA elements. Discharge limits for each of these metals are based on toxicity and dictated by state and federal regulations (e.g., drinking water, RCRA, etc.). RCRA metals are used in many current operations, are generated in decontamination and decommissioning (D&D) operations, and are also present in old process wastes that require treatment and stabilization. These metals can exist in solutions, as part of sludges, or as contaminants on soils or solid surfaces, as individual metals or as mixtures with other metals, mixtures with radioactive metals such as actinides (defined as mixed waste), or as mixtures with a variety of inert metals such as calcium and sodium. The authors have successfully completed a preliminary proof-of-principle evaluation of Polymer Filtration{trademark} (PF) technology for the dissolution of metallic mercury and have also shown that they can remove and concentrate RCRA metals from dilute solutions for a variety of aqueous solution types using PF technology. Another application successfully demonstrated is the dilute metal removal of americium and plutonium from process streams. This application was used to remove the total alpha contamination to below 30 pCi/L for the wastewater treatment plant at TA-50 at Los Alamos National Laboratory (LANL) and from nitric acid distillate in the acid recovery process at TA-55, the Plutonium Facility at LANL (ESP-CP TTP AL16C322). This project will develop and optimize the PF technology for specific DOE process streams containing RCRA metals and coordinate it with the needs of the commercial sector to ensure that technology transfer occurs.

  16. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    International Nuclear Information System (INIS)

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM's after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide's scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary

  17. Hazardous Waste/IGD: EF_RCRA

    Data.gov (United States)

    U.S. Environmental Protection Agency — EF_RCRA is a subset of facilities from FRS_INTEREST and FRS_FACILITY_SITE which are updated on a monthly basis as part of the Locational Reference Tables (LRT)...

  18. RCRA corrective action ampersand CERCLA remedial action reference guide

    International Nuclear Information System (INIS)

    1994-07-01

    This reference guide provides a side-by-side comparison of RCRA corrective action and CERCLA Remedial Action, focusing on the statutory and regulatory requirements under each program, criterial and other factors that govern a site's progress, and the ways in which authorities or requirements under each program overlap and/or differ. Topics include the following: Intent of regulation; administration; types of sites and/or facilities; definition of site and/or facility; constituents of concern; exclusions; provisions for short-term remedies; triggers for initial site investigation; short term response actions; site investigations; remedial investigations; remedial alternatives; clean up criterial; final remedy; implementing remedy; on-site waste management; completion of remedial process

  19. 76 FR 76158 - Agency Information Collection Activities; Proposed Collection; Comment Request; RCRA Expanded...

    Science.gov (United States)

    2011-12-06

    ... contents of the docket, and to access those documents in the public docket that are available..., including through the use of appropriate automated electronic, mechanical, or other technological collection... as State, local, or Tribal governments. Title: RCRA Expanded Public Participation. ICR numbers: EPA...

  20. EPA R1 RCRA Corrective Action 2020 Baseline Site Property Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — Property boundaries as indicated in figures of all facilities subject to RCRA Corrective Action on the 2020 baseline in Region 1. For more information on the RCRA...

  1. Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994

    International Nuclear Information System (INIS)

    1995-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and open-quotes Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilitiesclose quotes (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported

  2. Groundwater Monitoring Plan for the 1301-N, 1324-N/NA, and 1325-N RCRA Facilities

    International Nuclear Information System (INIS)

    Hartman, Mary J.

    2001-01-01

    The 1301-N and 1325-N Liquid Waste Disposal Facilities, the 1324-N Surface Impoundment, and the 1324-NA Percolation Pond, located in the 100 N Area of the Hanford Site, are regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The closure plans for these facilities stipulate that groundwater is monitored according to the 100-N Pilot Project: Proposed Consolidated Groundwater Monitoring Program (BHI-00725). This document supplements the consolidated plan by providing information on sampling and analysis protocols, quality assurance, data management, and a conceptual model for the RCRA sites. Monitoring well networks, constituents, and sampling frequency remain the same as in the consolidated plan or the previous groundwater monitoring plan (Hartman 1996)

  3. Quarterly RCRA Groundwater Monitoring Data for the Period July through September 2006

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.

    2007-02-01

    This report provides information about RCRA groundwater monitoring for the period July through September 2006. Eighteen Resource Conservation and Recovery Act (RCRA) sites were sampled during the reporting quarter.

  4. 77 FR 15966 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-19

    ... Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Final..., 1989 (54 FR 27170) to implement the RCRA hazardous waste management program. We granted authorization... Combustors; Final Rule, Checklist 198, February 14, 2002 (67 FR 6968); Hazardous Waste Management System...

  5. 76 FR 56708 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-09-14

    ... Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed..., 1989 (54 FR 27170) to implement the RCRA hazardous waste management program. We granted authorization... December 7, 2004. Waste Combustors; Final Rule; Checklist 198. Hazardous Waste Management March 13, 2002...

  6. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jungers, D.K.

    1993-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

  7. NPL deletion policy for RCRA-regulated TSD facilities finalized

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Under a new policy published by EPA on March 20, 1995, certain sites may be deleted from the National Priorities List (NPL) and deferred to RCRA corrective action. To be deleted from the NPL, a site must (1) be regulated under RCRA as a treatment, storage, or disposal (TSD) facility and (2) meet the four criteria specified by EPA. The new NPL deletion policy, which does not pertain to federal TSD facilities, became effective on April 19, 1995. 1 tab

  8. RCRA closures at Rocky Flats Plant: A programmatic perspective and case study

    International Nuclear Information System (INIS)

    Ogg, Randy T.; Peterman, Bruce D.

    1992-01-01

    The Interagency Agreement (IAG) integrates a unique mechanism for remediating hazardous waste sites at the Rocky Flats Plant (RFP), which include utilizing RCRA and CERCLA technical/regulatory processes. Pursuant to the IAG signed by the Department of Energy (DOE), Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH) on January 22, 1991, sixteen operable units (OUs) were defined for characterization and remediation at RFP. Of the sixteen OUs, six are classified as Resource Conservation and Recovery Act (RCRA) closure units. The six RCRA interim status closure units are: Solar Evaporation Ponds-OU 4, Present LandfUl-OU 7, Original Process Waste Lines-OU 9, Other Outside Closures-OU 10, West Spray Field-OU II, and Inside Building Closures-OU 15. The IAG will function as a technical/regulatory mechanism for managing/complying with all aspects of the RCRA interim status closure units at RFP. (author)

  9. Implementing RCRA during facility deactivation

    International Nuclear Information System (INIS)

    Lebaron, G.J.

    1997-01-01

    RCRA regulations require closure of permitted treatment, storage and disposal (TSD) facilities within 180 days after cessation of operations, and this may essentially necessitate decommissioning to complete closure. A more cost effective way to handle the facility would be to significantly reduce the risk to human health and the environment by taking it from its operational status to a passive, safe, inexpensive-to-maintain surveillance and maintenance condition (deactivation) prior to decommissioning. This paper presents an innovative approach to the cost effective deactivation of a large, complex chemical processing facility permitted under RCRA. The approach takes into account risks to the environment posed by this facility in comparison to risks posed by neighboring facilities at the site. The paper addresses the manner in which: 1) stakeholders and regulators were involved; 2) identifies a process by which the project proceeds and regulators and stakeholders were involved; 3) end points were developed so completion of deactivation was clearly identified at the beginning of the project, and 4) innovative practices were used to deactivate more quickly and cost effectively

  10. Results of RCRA groundwater quality assessment at the 216-B-3 Pond Facility

    International Nuclear Information System (INIS)

    Barnett, D.B.; Teel, S.S.

    1997-06-01

    This document describes a groundwater quality assessment of the 216-B-3 pond system, a Resources Conservation and Recovery act of 1976 (RCRA) waste facility. In 1990, sampling and chemical analysis of groundwater underlying the facility indicated that the contamination indicator parameters, total organic halogens (TOX), and total organic carbon (TOC) had exceeded established limits in two wells. This discovery placed the facility into RCRA groundwater assessment status and subsequently led to a more detailed hydrochemical analysis of groundwater underlying the facility. Comprehensive chemical analyses of groundwater samples from 1994 through 1996 revealed one compound, tris (2-chloroethyl) phosphate (TRIS2CH), that may have contributed to elevated TOX concentrations. No compound was identified as a contributor to TOC. Detailed evaluations of TOX, TOC, and TRIS2CH and comparison of occurrences of these parameters led to conclusions that (1) with few exceptions, these constituents occur at low concentrations below or near limits of quantitation; (2) it is problematic whether the low concentrations of TRIS2CH represent a contaminant originating from the facility or if it is a product of well construction; and (3) given the low and diminishing concentration of TOX, TOC, and TRIS2CH, no further investigation into the occurrent of these constituents is justified. Continued groundwater monitoring should include an immediate recalculation of background critical means of upgradient/downgradient comparisons and a return to seminannual groundwater monitoring under a RCRA indicator parameter evaluation program

  11. RCRA Treatment, Disposal, and Storage Site Boundaries in Louisiana, Geographic NAD83, EPA (2002) [RCRA_TSD_LA_poly_EPA_2002)

    Data.gov (United States)

    Louisiana Geographic Information Center — This is a shapefile of RCRA Treatment, Storage, and Disposal facility boundaries developed by PRC Environmental Management, Inc (PRC) per a Work Assignment from the...

  12. EPA seeks to make RCRA more effective through legislative changes

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Since RCRA was enacted in 1976 and amended in 1984, hazardous waste management has been transformed. To protect human health and the environment as mandated by the act, EPA has developed a complex cradle-to-grave system for managing hazardous waste. The agency recognizes that some targeted legislative changes could make RCRA even more useful, particularly by (1) establishing some open-quotes middle groundclose quotes for waste posing low risks, and (2) emphasizing sensible and enforceable hazardous waste management practices

  13. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments

  14. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

  15. The Pinellas Plant RCRA facility investigation - A case study

    International Nuclear Information System (INIS)

    Kilbury, Richard; Keshian, Berg; Farley, Dwain; Meyer, David; Ingle, David; Biedermann, Charles

    1992-01-01

    Under the direction of the U.S. Department of Energy Albuquerque Field Office Environmental Restoration Program, a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) was completed at the Pinellas Plant to fulfill requirements of the Hazardous and Solid Waste Amendments of 1984 (HSWA) permit issued on February 9, 1990 by the U.S. Environmental Protection Agency (EPA). This RFI addressed potential contaminant releases and environmental conditions at 15 solid waste management units (SWMUs). The RFI characterization program began in April 1990 and was completed in May 1991. The scope of RFI data collection activities is presented in the Pinellas Plant RFI Workplan issued in May 1990 and approved by EPA on April 16, 1991. An RFI Report was submitted to EPA on September 1, 1991. This paper presents a summary of RFI results and conclusions. Primary environmental concerns at the Pinellas Plant are emphasized. (author)

  16. Glossary of CERCLA, RCRA and TSCA related terms and acronyms

    International Nuclear Information System (INIS)

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993

  17. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments

  18. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments.

  19. Analysis of TRU waste for RCRA-listed elements

    International Nuclear Information System (INIS)

    Mahan, C.; Gerth, D.; Yoshida, T.

    1996-01-01

    Analytical methods for RCRA listed elements on Portland cement type waste have been employed using both microwave and open hot plate digestions with subsequent analysis by inductively coupled plasma atomic emission spectroscopy (ICP-AES), inductively coupled plasma mass spectrometry (ICP-AES), inductively coupled plasma mass spectrometry (ICP-MS), graphite furnace atomic absorption (GFAA) and cold vapor atomic absorption and fluorescence (CVAA/CVAFS). Four different digestion procedures were evaluated including an open hot plate nitric acid digestion, EPA SW-846 Method 3051, and 2 methods using modifications to Method 3051. The open hot plate and the modified Method 3051, which used aqua regia for dissolution, were the only methods which resulted in acceptable data quality for all 14 RCRA-listed elements. Results for the nitric acid open hot plate digestion were used to qualify the analytical methods for TRU waste characterization, and resulted in a 99% passing score. Direct chemical analysis of TRU waste is being developed at Los Alamos National Laboratory in an attempt to circumvent the problems associated with strong acid digestion methods. Technology development includes laser induced breakdown spectroscopy (LIBS), laser ablation inductively coupled plasma mass spectrometry (LA-ICPMS), dc arc CID atomic emission spectroscopy (DC-AES), and glow discharge mass spectrometry (GDMS). Analytical methods using the Portland cement matrix are currently being developed for each of the listed techniques. Upon completion of the development stage, blind samples will be distributed to each of the technology developers for RCRA metals characterization

  20. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  1. A generic hazardous waste management training program

    International Nuclear Information System (INIS)

    Carter, R.J.; Karnofsky, B.

    1988-01-01

    The main purpose of this training program element is to familiarize personnel involved in hazardous waste management with the goals of RCRA and how they are to be achieved. These goals include: to protect health and the environment; to conserve valuable material and energy resources; to prohibit future open dumping on the land; to assure that hazardous waste management practices are conducted in a manner which protects human health and the environment; to insure that hazardous waste is properly managed thereby reducing the need for corrective actions in the future; to establish a national policy to reduce or eliminate the generation of hazardous waste, wherever feasible. Another objective of this progam element is to present a brief overview of the RCRA regulations and how they are implemented/enforced by the Environmental Protection Agency (EPA) and each of the fifty states. This element also discusses where the RCRA regulations are published and how they are updated. In addition it details who is responsible for compliance with the regulations. Finally, this part of the training program provides an overview of the activities and materials that are regulated. 1 ref

  2. SACM and the RCRA stabilization initiative: Similarities of principles and applicability

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) provide standards for the remediation of environmental media contaminated with hazardous substances or hazardous waste, respectively. In both cases, prior to the US Environmental Protection Agency`s (EPA) development of the two subject reform initiatives, existing formal processes specified the level of site investigation required, the process for reaching a decision on the method of remediation, public participation in the decision process, and enforcement authorities that include orders and schedules of compliance. Traditionally, implementation of these processes has resulted in a great amount of time, effort, and money being expended before actual remediation began. Following criticism from the public and the regulated community, the EPA has proposed streamlining reforms for hazardous waste site cleanup under both CERCLA and RCRA that will begin remediation sooner with lower costs. The purpose of this Information Brief is to discuss the common goals, processes, and strategies of the Superfund Accelerated Cleanup Model (SACM) and the RCRA Stabilization Initiative.

  3. The implications of RCRA [Resource Conservation and Recovery Act] regulation for the disposal of transuranic and high-level waste

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Sharples, F.E.; Smith, E.D.

    1988-01-01

    In May of 1987 the Department of Energy (DOE) published a rule interpreting the definition of ''byproduct'' under the Atomic Energy Act. This byproduct rule clarified the role of the Resource Conservation and Recovery Act (RCRA) in the regulation of DOE's radioactive waste management activities. According to the rule, only the radioactive portion of DOE's mixed radioactive and hazardous waste (mixed waste), including mixed transuranic (TRU) and high-level waste (HLW), is exempt from RCRA under the byproduct exemption. The portion of a waste that is hazardous as defined by RCRA is subject to full regulation under RCRA. Because the radioactive and hazardous portions of m any, if not most, DOE wastes are likely to be inseparable, the rule in effect makes most mixed wastes subject to dual regulation. The potential application of RCRA to facilities such as the Waste Isolation Pilot Plant (WIPP) and the HLW repository creates unique challenges for both the DOE and regulatory authorities. Strategies must be developed to assure compliance with RCRA without either causing excessive administrative burdens or abandoning the goal of minimizing radiation exposure. This paper will explore some of the potential regulatory options for and recent trends in the regulation of TRU and HLW under RCRA

  4. Quarterly report of RCRA groundwater monitoring data for period April 1 through June 30, 1994

    International Nuclear Information System (INIS)

    1994-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and ''Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities,'' as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company manages RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. This quarterly report contains data received between May 20 and August 19, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter but also data from earlier sampling events that were not previously reported

  5. Glossary of CERCLA, RCRA and TSCA related terms and acronyms. Environmental Guidance

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993.

  6. Obtaining variances from the treatment standards of the RCRA Land Disposal Restrictions

    International Nuclear Information System (INIS)

    1990-05-01

    The Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDRs) [40 CFR 268] impose specific requirements for treatment of RCRA hazardous wastes prior to disposal. Before the LDRs, many hazardous wastes could be land disposed at an appropriately designed and permitted facility without undergoing treatment. Thus, the LDRs constitute a major change in the regulations governing hazardous waste. EPA does not regulate the radioactive component of radioactive mixed waste (RMW). However, the hazardous waste component of an RMW is subject to RCRA LDR regulations. DOE facilities that manage hazardous wastes (including radioactive mixed wastes) may have to alter their waste-management practices to comply with the regulations. The purpose of this document is to aid DOE facilities and operations offices in determining (1) whether a variance from the treatment standard should be sought and (2) which type (treatability or equivalency) of petition is appropriate. The document also guides the user in preparing the petition. It shall be noted that the primary responsibility for the development of the treatability petition lies with the generator of the waste. 2 figs., 1 tab

  7. RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988

  8. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan

  9. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Chou, C.J.; Johnson, V.G.

    1999-10-07

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan.

  10. RCRA land unit closures at the Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; Delozier, M.F.P.; Manrod, W.E.

    1987-01-01

    Eight land-based hazardous waste management units at the Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA program include the development of risk assessments and the preparation of an integrated schedule

  11. Low-level mixed waste: An RCRA perspective for NRC licensees

    International Nuclear Information System (INIS)

    1990-08-01

    The publication presents an overview of RCRA requirements for commercially-generated low-level mixed waste. It is designed for Nuclear Regulatory Commission (NRC) licensees who may not be familiar with EPA regulations that apply to their waste products

  12. EPA Linked Open Data: Resource Conservation and Recovery Act Handlers (RCRA)

    Data.gov (United States)

    U.S. Environmental Protection Agency — RCRAInfo is EPA’s comprehensive information system that supports the Resource Conservation and Recovery Act (RCRA) of 1976 and the Hazardous and Solid Waste...

  13. RCRA closure of eight land-based units at the Y-12 plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Welch, S.H.

    1988-01-01

    Eight land-based hazardous waste management units at the Oak Ridge Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of risk assessments and the preparation of an integrated schedule

  14. RCRA [Resource Conservation and Recovery Act] ground-water monitoring projects for Hanford facilities: Annual progress report for 1988

    International Nuclear Information System (INIS)

    Fruland, R.M.; Lundgren, R.E.

    1989-04-01

    This report describes the progress during 1988 of 14 Hanford Site ground-water monitoring projects covering 16 hazardous waste facilities and 1 nonhazardous waste facility (the Solid Waste Landfill). Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act (RCRA) of 1976 and the State of Washington Administrative Code. 21 refs., 23 figs., 8 tabs

  15. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  16. Rocky Flats Solar Evaporation Ponds RCRA hybrid-closure case study

    International Nuclear Information System (INIS)

    Ogg, R.T.; Everett, L.G.; Cullen, S.J.

    1994-01-01

    The Solar Evaporation Ponds (SEP)/Operable Unit 4 (OU 4), located at the Rocky Flats Plant (RFP) sixteen miles northwest of Denver, Colorado, is currently undergoing remediation/Resource Conservation and Recovery Act (RCRA) closure in accordance with the Rocky Flats Interagency Agreement (IAG) signed by the US Department of Energy (DOE), US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH) on January 22, 1991. Based on the ''Phase 1'' (source and soils) RCRA Facility Investigation/Remedial Investigation (RFM data and interpretations), the DOE and EG and G Rocky Flats, Inc. (EG and G) have selected a permanent surface engineered/isolation barrier as the technological option for remediation of the SEP. The DOE and EG and G will utilize all natural materials to create an ''impermeable'' barrier/structure to isolate the waste being left in place from impacting human health and the environment for a minimum of 1,000 years. Their rationale for utilizing natural materials is two fold; (1) optimize long term performance of the barrier and; (2) design a structure which will be near maintenance free (passive remediation) for 1,000 years. The DOE and EG and G have taken a proactive approach in providing post closure performance assessment for this RCRA closure action. An integrated monitoring system has been designed which will include monitoring the engineered barrier, vadose zone and ground water systems. Rocky Flats will integrate instrumentation into the permanent engineered barrier which will provide early warning of potential liquid migration through the barrier and into the waste zone

  17. Applicability of federal and state hazardous waste regulatory programs to waste chemical weapons and chemical warfare agents.; TOPICAL

    International Nuclear Information System (INIS)

    Haffenden, R.; Kimmell, T.

    2002-01-01

    This report reviews federal and state hazardous waste regulatory programs that govern the management of chemical weapons or chemical warfare agents. It addresses state programs in the eight states with chemical weapon storage facilities managed by the U.S. Army: Alabama, Arkansas, Colorado, Indiana, Kentucky, Maryland, Oregon, and Utah. It also includes discussions on 32 additional states or jurisdictions with known or suspected chemical weapons or chemical warfare agent presence (e.g., disposal sites containing chemical agent identification sets): Alaska, Arizona, California, Florida, Georgia, Hawaii, Idaho, Illinois, Iowa, Kansas, Louisiana, Massachusetts, Michigan, Mississippi, Missouri, Nebraska, Nevada, New Jersey, New Mexico, New York, North Carolina, Ohio, Pennsylvania, South Carolina, South Dakota, Tennessee, Texas, the U.S. Virgin Islands, Virginia, Washington, Washington, D.C., and Wyoming. Resource Conservation and Recovery Act (RCRA) hazardous waste programs are reviewed to determine whether chemical weapons or chemical warfare agents are listed hazardous wastes or otherwise defined or identified as hazardous wastes. Because the U.S. Environmental Protection Agency (EPA) military munitions rule specifically addresses the management of chemical munitions, this report also indicates whether a state has adopted the rule and whether the resulting state regulations have been authorized by EPA. Many states have adopted parts or all of the EPA munitions rule but have not yet received authorization from EPA to implement the rule. In these cases, the states may enforce the adopted munitions rule provisions under state law, but these provisions are not federally enforceable

  18. EPA's approach to regulation of mixed waste and status of future activities

    International Nuclear Information System (INIS)

    Shackleford, B.

    1988-01-01

    Regulation of radioactive mixed waste is a topic that has received much attention in the past several years. Much of the discussion and confusion stemmed from uncertainty about applicable regulatory authorities. On July 3, 1986, EPA clarified its position that the Resource Conservation and Recovery Act (RCRA) applied to the hazardous component of radioactive mixed waste. The Agency announced this clarification in the Federal Register and informed States that they must seek authority to regulate mixed waste in order to obtain or maintain RCRA authorization to administer and enforce a hazardous waste program in lieu of EPA. Since that time, five States have received authorization to regulate mixed waste: Colorado, South Carolina, Tennessee, Washington, and Georgia. Authorized States issue RCRA permits in lieu of EPA. Currently, 44 States have been authorized for the base RCRA program, Conversely, 12 States and Trust Territories have no RCRA authorization. In these States and territories, EPA administers that RCRA hazardous waste program. A more stringent State requirement occurs when a State allows less time for compliance than would be provided under Federal law, for example. There is a third authorization category with respect to mixed waste that I have yet to address. This category is made up of States which have EPA authorization to regulate hazardous waste but have yet to obtain mixed waste authorization. Most States fall into this category. In these States, of which there are 39, mixed wastes are not hazardous wastes and subject to Subtitle C regulations

  19. Transportable Vitrification System RCRA Closure Practical Waste Disposition Saves Time And Money

    International Nuclear Information System (INIS)

    Brill, Angie; Boles, Roger; Byars, Woody

    2003-01-01

    The Transportable Vitrification System (TVS) was a large-scale vitrification system for the treatment of mixed wastes. The wastes contained both hazardous and radioactive materials in the form of sludge, soil, and ash. The TVS was developed to be moved to various United States Department of Energy (DOE) facilities to vitrify mixed waste as needed. The TVS consists of four primary modules: (1) Waste and Additive Materials Processing Module; (2) Melter Module; (3) Emissions Control Module; and (4) Control and Services Module. The TVS was demonstrated at the East Tennessee Technology Park (ETTP) during September and October of 1997. During this period, approximately 16,000 pounds of actual mixed waste was processed, producing over 17,000 pounds of glass. After the demonstration was complete it was determined that it was more expensive to use the TVS unit to treat and dispose of mixed waste than to direct bury this waste in Utah permitted facility. Thus, DOE had to perform a Resource Conservation and Recovery Act (RCRA) closure of the facility and find a reuse for as much of the equipment as possible. This paper will focus on the following items associated with this successful RCRA closure project: TVS site closure design and implementation; characterization activities focused on waste disposition; pollution prevention through reuse; waste minimization efforts to reduce mixed waste to be disposed; and lessons learned that would be integrated in future projects of this magnitude

  20. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk- In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Subsequently, this plan was modified again and approved as Y/TS-395, Revised RCRA Closure Plan for the Bear Creek Burial Grounds (February 29, 1988). Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. The plan was presented to the state of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. This amended closure plan goes further to include inspection and maintenance criteria along with other details

  1. ENVIRONMENTALLY SOUND DISPOSAL OF RADIOACTIVE MATERIALS AT A RCRA HAZARDOUS WASTE DISPOSAL FACILITY

    International Nuclear Information System (INIS)

    Romano, Stephen; Welling, Steven; Bell, Simon

    2003-01-01

    The use of hazardous waste disposal facilities permitted under the Resource Conservation and Recovery Act (''RCRA'') to dispose of low concentration and exempt radioactive materials is a cost-effective option for government and industry waste generators. The hazardous and PCB waste disposal facility operated by US Ecology Idaho, Inc. near Grand View, Idaho provides environmentally sound disposal services to both government and private industry waste generators. The Idaho facility is a major recipient of U.S. Army Corps of Engineers FUSRAP program waste and received permit approval to receive an expanded range of radioactive materials in 2001. The site has disposed of more than 300,000 tons of radioactive materials from the federal government during the past five years. This paper presents the capabilities of the Grand View, Idaho hazardous waste facility to accept radioactive materials, site-specific acceptance criteria and performance assessment, radiological safety and environmental monitoring program information

  2. Molten salt oxidation of mixed wastes: Separation of radioactive materials and Resource Conservation and Recovery Act (RCRA) materials

    International Nuclear Information System (INIS)

    Bell, J.T.; Haas, P.A.; Rudolph, J.C.

    1995-01-01

    The Oak Ridge National Laboratory (ORNL) is participating in a program to apply a molten salt oxidation (MSO) process to treatment of mixed (radioactive and RCRA) wastes. The salt residues from the MSO treatment will require further separations or other processing to prepare them for final disposal. A bench-scale MSO apparatus is being installed at ORNL and will be operated on real Oak Ridge wastes. The treatment concepts to be tested and demonstrated on the salt residues from real wastes are described

  3. Identification, classification and management of industrial waste in Kavir steel complex according to the Bazel convention and RCRA

    Directory of Open Access Journals (Sweden)

    Mohammad Hasan Ehrampoush

    2016-06-01

    Full Text Available Introduction: Requiring industries for implementing industrial waste management programs and planning for proper waste disposal is essential in order to achieve sustainable development. Therefore, industrial waste management program was done in Kavir Steel Complex, in Aran va Bidgol region to identify and classify industrial waste and also to present solutions for improving waste management. In this complex, production process is hot rolling steel and the product is rebar. Material and Method: The preset study was conducted in Kavir Steel Complex. Following survey of production process and sources of waste, the type and volume of produced waste were identified and measured during 3 months. Then, the classification of wastes was done according to the Bazel Convention and Resource Conservation and Recovery Act (RCRA, and finally new industrial & health solid waste management program was presented. Result: Considering the volume, industrial waste of production process in Kavir Steel Complex was between 130 to 180 grams per each ton of rebar. Main industrial waste included oxide of steel billet, industrial sludge, used oil and lubricant which were classified according to the RCRA: 8 materials with T code, 1 with C code, 5 with I code and 3 materials with C code. Conclusion: The results revealed that the most amount of industrial waste in Kavir Steel Complex is the waste of steel billet and industrial sludge, and more than 90% of Kavir steel industrial waste were reused and recycled inside or outside of this complex. It is recommended that used oil to be transport and maintain in the safe containers.

  4. Decontamination Study for Mixed Waste Storage Tanks RCRA Closure

    International Nuclear Information System (INIS)

    Leaphart, D.M.; Reed, S.R.; Rankin, W.N.

    1995-01-01

    The Savannah River Site (SRS) plans to close six underground tanks storing mixed waste under RCRA regulations. In support of this closure effort, a study was performed to determine the optimal method of decontaminating these tanks to meet the closure requirements. Items consaidered in the evaluation of the decontamination methods included effectiveness, compatibility with existing waste residues, possible cleaning solution disposal methods, and cost

  5. CERCLA and RCRA requirements affecting cleanup of a hazardous waste management unit at a Superfund site: A case study

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1995-03-01

    The Fernald Environmental Management Project (FEMP) attempted to address both RCRA and CERCLA requirements at the fire training facility (FTF) by integrating a CERCLA removal action work plan with a RCRA closure plan. While the regulatory agencies involved with the FTF cleanup agreed the integrated document was a good idea, implementation proved complicated, owing to disposition of clean debris from a Superfund site, treatment of contaminated media, duration of cleanup activities, and cleanup certification. While all the complications have not been resolved, solutions to all have been proposed to Ohio EPA and U.S. EPA. Both agencies have worked closely with FEMP to find the most effective fulfillment of RCRA and CERCLA requirements

  6. Ground-water monitoring under RCRA

    International Nuclear Information System (INIS)

    Coalgate, J.

    1993-11-01

    In developing a regulatory strategy for the disposal of hazardous waste under the Resource Conservation and Recovery Act (RCRA), protection of ground-water resources was the primary goal of the Environmental Protection Agency (EPA). EPA's ground-water protection strategy seeks to minimize the potential for hazardous wastes and hazardous constituents in waste placed in land disposel units to migrate into the environment. This is achieved through liquids management (limiting the placement of liquid wastes in or on the land, requiring the use of liners beneath waste, installing leachate collection systems and run-on and run-off controls, and covering wastes at closure). Ground-water monitoring serves to detect any failure in EPA's liquids management strategy so that ground-water contamination can be detected and addressed as soon as possible

  7. ORGDP RCRA/PCB

    International Nuclear Information System (INIS)

    Rodgers, T.

    1986-01-01

    A dual purpose solid/liquid incinerator is currently being constructed at the Oak Ridge Gaseous Diffusion Plant [ORGDP (K-25)] to destroy uranium contaminated, hazardous organic wastes in compliance with the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). These wastes are generated by the gaseous diffusion plants in Oak Ridge, TN; Paducah, KY; and Portsmouth, OH. In addition, waste will also be received from the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the Feed Materials Production Center (FMPC). Destruction of PCBs and hazardous liquid organic wastes will be accomplished in a rotary kiln incinerator with an afterburner. This system was selected after a study of various alternatives which are covered in Report No. X-OE-141. Incineration was chosen because it is dependable, permanent, detoxifies organics, and reduces volume. The rotary kiln incinerator was selected because it can thermally destroy organic constituents of liquids, solids, and sludges to produce an organically inert ash. The incineration system, off-gas treatment system, and related instrumentation and controls are being provided by International Waste Energy Systems (IWES) which is responsible for design, construction, startup, and performance testing

  8. Self-assembled monolayers on mosoporous supports (SAMMS) for RCRA metal removal

    Energy Technology Data Exchange (ETDEWEB)

    Feng, Xiangdong; Liu, Jun; Fryxell, G. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-10-01

    The Mixed Waste Focus Area has declared mercury removal and stabilization as the first and fourth priorities among 30 prioritized deficiencies. Resource Conservation and Recovery Act (RCRA) metal and mercury removal has also been identified as a high priority at DOE sites such as Albuquerque, Idaho Falls, Oak Ridge, Hanford, Rocky Flats, and Savannah River. Under this task, a proprietary new technology, Self-Assembled Monolayers on Mesoporous Supports (SAMMS), for RCRA metal ion removal from aqueous wastewater and mercury removal from organic wastes such as vacuum pump oils is being developed at Pacific Northwest National Laboratory (PNNL). The six key features of the SAMMS technology are (1) large surface area (>900 m{sup 2}/g) of the mesoporous oxides (SiO{sub 2}, ZrO{sub 2}, TiO{sub 2}) ensures high capacity for metal loading (more than 1 g Hg/g SAMMS); (2) molecular recognition of the interfacial functional groups ensures the high affinity and selectivity for heavy metals without interference from other abundant cations (such as calcium and iron) in wastewater; (3) suitability for removal of mercury from both aqueous wastes and organic wastes; (4) the Hg-laden SAMMS not only pass TCLP tests, but also have good long-term durability as a waste form because the covalent binding between mercury and SAMMS has good resistance to ion exchange, oxidation, and hydrolysis; (5) the uniform and small pore size (2 to 40 nm) of the mesoporous silica prevents bacteria (>2000 nm) from solubilizing the bound mercury; and (6) SAMMS can also be used for RCRA metal removal from gaseous mercury waste, sludge, sediment, and soil.

  9. RCRA corrective action for underground storage tanks -- Subtitle C for Subtitle I

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of this report is to provide guidance to DOE and DOE contractor personnel responsible for planning and implementation of corrective measures addressing cleanup of releases of hazardous materials or regulated substances from underground storage tanks regulated under RCRA Subtitle C or Subtitle I

  10. Exiting RCRA Subtitle C regulation data for supporting a new regulatory path for immobilized mixed debris

    Energy Technology Data Exchange (ETDEWEB)

    Porter, C.L. [Jetseal, Inc., Idaho Falls, ID (United States); Carson, S.D.; Cheng, Wu-Ching [Sandia National Labs., Albuquerque, NM (United States)

    1995-12-31

    This paper presents analytical and empirical data that provide technical support for the position that mixed debris (debris contaminated with both radioactive and hazardous constituents) treated by immobilization in accordance with 40 CFR 268.45 can exit RCRA Subtitle C requirements at the time the treatment is complete. Pathways analyses and risk assessments of low-level waste and RCRA mixed waste disposal facilities show that these two types of facilities provide equivalent long-term (> 100 years) performance and protection of human health and the environment. A proposed two-tier approach for waste form performance criteria is discussed.

  11. Performance test results of noninvasive characterization of RCRA surrogate waste by prompt gamma neutron activation analysis

    International Nuclear Information System (INIS)

    Gehrke, R.J.; Propp, W.A.

    1997-11-01

    A performance evaluation to determine the feasibility of using prompt gamma neutron activation analysis (PGNAA) for noninvasive, quantitative assay of mixed waste containers was sponsored by DOE's Office of Technology Development (OTD), the Mixed Waste Focus Area (MWFA), and the Idaho National Engineering and Environmental Laboratory (INEEL). The evaluation was conducted using a surrogate waste, based on Portland cement, that was spiked with three RCRA metals, mercury, cadmium, and lead. The results indicate that PGNAA has potential as a process monitor. However, further development is required to improve its sensitivity to meet regulatory requirements for determination of these RCRA metals

  12. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  13. The marriage of RCRA and CERCLA at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Shelton, D.C.; Brooks, L.M.

    1998-01-01

    A key goal of the Rocky Flats Cleanup Agreement (RFCA) signed in July of 1996 was to provide a seamless marriage of the Resource Conservation and Recovery Act (RCRA) (and other media specific programs) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the implementing agencies of each. This paper examines the two years since the signing of RFCA and identifies the successes, failures, and stresses of the marriage. RFCA has provided an excellent vehicle for regulatory and substantive progress at the Department of Energy's Rocky Flats facility. The key for a fully successful marriage is to build on the accomplishments to date and to continually improve the internal and external systems and relationships. To date, the parties can be proud of both the substantial accomplishment of substantive environmental work and the regulatory systems that have enabled the work

  14. Preparation of radioactive ''mixed'' waste samples for measurement of RCRA [Resource Conservation and Recovery Act] organic compounds

    International Nuclear Information System (INIS)

    Tomkins, B.A.; Caton, J.E.

    1987-01-01

    A radioactive ''mixed'' waste typically contains alpha-, beta-, or gamma-emitting radionuclides and varying quantities of semivolatile or volatile organic species, some or all of which may be named specifically by the Resource Conservation and Recovery Act (RCRA). Because there are no acceptable means available currently for disposing of these mixed wastes, they are presently stored above-ground in sealed drums. For this reason, analytical procedures which can determine RCRA organics in radioactive waste are necessary for deciding the proper approach for disposal. An important goal of this work is the development of methods for preparing mixed waste samples in a manner which allows the RCRA organics to be measured in conventional organic analysis laboratories without special precautions. Analytical procedures developed for handling mixed waste samples must satisfy not only the usual constraints present in any trace-level organic chemical determination, but also those needed to insure the protection of the operator from radioactive contamination. Consequently, procedures should be designed to use the least amount of radioactive sample commensurate with achieving acceptable sensitivity with the RCRA analytical methods. Furthermore, the unusual laboratory glassware which would normally be used should be replaced with disposable materials wherever possible, in order to reduce the ''clean-up'' time required, and thereby reduce the operator's exposure to radioactivity. Actual sample handling should be reduced to the absolute minimum. Finally, the final isolate must exhibit a sufficiently low level of alpha, beta, or gamma activity to permit detailed characterization in a conventional organic analysis laboratory. 4 refs., 5 tabs

  15. INEL RCRA [Resource Conservation and Recovery Act] permit for incineration of hazardous waste: Status report

    International Nuclear Information System (INIS)

    McFee, J.N.; Dalton, J.D.; Bohrer, H.A.

    1987-01-01

    The Waste Experimental Reduction Facility (WERF) was constructed to reduce the volume of low-level radioactive waste at the Idaho National Engineering Laboratory (INEL). To address the problem of radioactively contaminated ignitable hazardous waste resulting from INEL activities, a development program was carried out to evaluate WERF's ability to meet the regulated criteria for incinerating liquid and solid ignitable waste. Concurrently, INEL submitted its hazardous waste Part B application under the Resource Conservation and Recovery Act (RCRA). As required, and as a major step in the permitting process, the WERF incinerator portion of the permit application included a proposed trial burn, which is a demonstration test of the incinerator's ability to destroy hazardous materials. The trial burn plan was designed to demonstrate the system performance for liquid and solid ignitable wastes at three operating conditions, using a prepared mix of materials representative of waste to be processed. EPA Region X reviewed and commented on the plan prior to the trial burn. Results of the liquid feed trial burn showed a greater than 97% probability of meeting the RCRA-dictated DRE value for chlorinated solvents and a greater than 99% probability for nonchlorinated solvents. Nonchlorinated solid waste results were calculated at a 93% probability of meeting the required DRE, with a 75% probability for chlorinated solid wastes. In addition, the incinerator DRE continued to improve long after the assumed pre-test equilibrium period had ended. The trial burn demonstrates that the WERF incinerator can safely and adequately destroy ignitable hazardous and mixed waste and provides a significant enhancement of the INEL's waste management system

  16. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  17. RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.

    2007-03-26

    WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modi¬fied in 40 CFR Part 265, Subpart F and Washington State’s Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

  18. Groundwater monitoring plan for the Hanford Site 216-B-3 pond RCRA facility

    International Nuclear Information System (INIS)

    Barnett, D.B.; Chou, C.J.

    1998-06-01

    The 216-B-3 pond system was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In operation since 1945, the B Pond system has been a RCRA facility since 1986, with Resource Conservation and Recovery Act (RCRA) interim-status groundwater monitoring in place since 1988. In 1994, discharges were diverted from the main pond, where the greatest potential for contamination was thought to reside, to the 3C expansion pond. In 1997, all discharges to the pond system were discontinued. In 1990, the B Pond system was elevated from detection groundwater monitoring to an assessment-level status because total organic halogens and total organic carbon were found to exceed critical means in two wells. Subsequent groundwater quality assessment failed to find any specific hazardous waste contaminant that could have accounted for the exceedances, which were largely isolated in occurrence. Thus, it was recommended that the facility be returned to detection-level monitoring

  19. Hanford Site Guide for Preparing and Maintaining Fenerator Group Pollution Prevention Program Documentation

    International Nuclear Information System (INIS)

    PLACE, B.G.

    1999-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention/Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 1998a) and Prime Contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and (300501) (RCRA and EPA, 1994). Documentation guidance for the following five P2/WMin elements are discussed: Fiscal Year (FY) Goals; Budget and Staffing; Waste Minimization (WMinn ) Assessments (WMAs); Pollution Prevention (P2) Reporting; WMin Certification

  20. CY2003 RCRA GROUNDWATER MONITORING WELL SUMMARY REPORT

    International Nuclear Information System (INIS)

    MARTINEZ, C.R.

    2003-01-01

    This report describes the calendar year (CY) 2003 field activities associated with the installation of two new groundwater monitoring wells in the A-AX Waste Management Area (WMA) and four groundwater monitoring wells in WMA C in the 200 East Area of the Hanford Nuclear Reservation. All six wells were installed by Fluor Hanford Inc. (FH) for CH2M Hill Hanford Group, Inc. (CHG) in support of Draft Hanford Facility Agreement and Consent Order (Tri-Party Agreement) M-24-00 milestones and ''Resource Conservation and Recovery Act of 1976'' (RCRA) groundwater monitoring requirements. Drilling data for the six wells are summarized in Table 1

  1. Long range planning, scheduling and budgeting for the environmental compliance program at the Rocky Flats Plant

    International Nuclear Information System (INIS)

    McKinley, K.B.; Nielsen, T.H.

    1989-01-01

    This paper reports how the Rocky Flats RCRA/CERCLA group at the Rocky Flats Plant in Golden, Colorado is developing a computerized schedule and budget management system. The system will aggregate schedule, budgets, and regulatory commitments provided by RCRA/CERCLA program managers. The system will provide tabular and graphical representations of the schedule and budget information at various levels of detail. The system will perform a variety of analyses on the schedule and budget. The RCRA/CERCLA group will use the results to develop realistic compliance schedules and the budgets necessary to meet them. Presentation of the schedules and budgets in a consistent graphical and tabular form will give a good appreciation of the remediation costs as understood by the RCRA/CERCLA group. The system will then be used to test resource availability and remediation period scenarios, differing from the optimal combination as determined by the RCRA/CERCLA group

  2. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  3. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  4. Cleanups In My Community (CIMC) - RCRA and Base Realignment and Closure (BRAC) Federal Facilities, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Resource Conservation and Recovery Act (RCRA) Base Realignment and Closure (BRAC) sites as part of the CIMC web service. The...

  5. Dewatering and RCRA partial closure action on solar evaporation ponds, Rocky Flats Plant, Golden, Colorado

    International Nuclear Information System (INIS)

    1991-06-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (DOE/EA-0487) on its proposal to partially close five solar evaporation ponds at the Rocky Flats Plant (RFP) pursuant to the requirements of the Resource Conservation and Recovery Act (RCRA). This proposal would be known as a RCRA partial closure and would be accomplished by dewatering the ponds, where necessary, and converting any remaining sludge or evaporator concentrate to a solid wasteform (pondcrete and saltcrete). The pond sites would be stabilized to prevent erosion or other disturbance to the soil and to prevent infiltration of rain or snowmelt. The solid wasteform would be transported offsite for disposal. The five solar ponds (designated 207-A, 207-B (north, center, and south), and 207-C), are the only solar evaporation ponds that exist at the RFP. A finding of no significant impact is included

  6. Hanford Site guide for preparing and maintaining generator group pollution prevention program documentation

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 1998a) and Prime contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Documentation guidance for the following five P2/WMin elements are discussed: Fiscal Year (FY) Goals; Budget and Staffing; Waste Minimization (WMin) Assessments (WMAs); Quarterly Pollution Prevention (P2) Reporting WMin Certification

  7. Molten salt oxidation of mixed wastes: Separation of radioactive materials and Resource Conservation and Recovery Act (RCRA) materials

    International Nuclear Information System (INIS)

    Bell, J.T.; Haas, P.A.; Rudolph, J.C.

    1993-01-01

    The Oak Ridge National Laboratory (ORNL) is involved in a program to apply a molten salt oxidation (MSO) process to the treatment of mixed wastes at Oak Ridge and other Department of Energy (DOE) sites. Mixed wastes are defined as those wastes that contain both radioactive components, which are regulated by the atomic energy legislation, and hazardous waste components, which are regulated under the Resource Conservation and Recovery Act (RCRA). A major part of our ORNL program involves the development of separation technologies that are necessary for the complete treatment of mixed wastes. The residues from the MSO treatment of the mixed wastes must be processed further to separate the radioactive components, to concentrate and recycle residues, or to convert the residues into forms acceptable for final disposal. This paper is a review of the MSO requirements for separation technologies, the information now available, and the concepts for our development studies

  8. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.

  9. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  10. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  11. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  12. Combination RCRA groundwater monitoring plan for the 216-A-10, 216-A-36B, and 216-A-37-1 PUREX cribs

    International Nuclear Information System (INIS)

    Lindberg, J.W.

    1997-06-01

    This document presents a groundwater quality assessment monitoring plan, under Resource Conservation and Recovery Act of 1976 (RCRA) regulatory requirements for three RCRA sites in the Hanford Site's 200 East Area: 216-A-10, 216-A-36B, and 216-A-37-1 cribs (PUREX cribs). The objectives of this monitoring plan are to combine the three facilities into one groundwater quality assessment program and to assess the nature, extent, and rate of contaminant migration from these facilities. A groundwater quality assessment plan is proposed because at least one downgradient well in the existing monitoring well networks has concentrations of groundwater constituents indicating that the facilities have contributed to groundwater contamination. The proposed combined groundwater monitoring well network includes 11 existing near-field wells to monitor contamination in the aquifer in the immediate vicinity of the PUREX cribs. Because groundwater contamination from these cribs is known to have migrated as far away as the 300 Area (more than 25 km from the PUREX cribs), the plan proposes to use results of groundwater analyses from 57 additional wells monitored to meet environmental monitoring requirements of US Department of Energy Order 5400.1 to supplement the near-field data. Assessments of data collected from these wells will help with a future decision of whether additional wells are needed

  13. ORGDP RCRA/PCB incinerator facility

    International Nuclear Information System (INIS)

    Rogers, T.

    1987-01-01

    A dual purpose solid/liquid incinerator is currently being constructed at the Oak Ridge Gaseous Diffusion Plant [ORGDP (K-25)] to destroy uranium contaminated, hazardous organic wastes in compliance with the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). These wastes are generated by the gaseous diffusion plants in Oak Ridge, TN; Paducah, KY; and Portsmouth, OH. In addition, waste will also be received from the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the Feed Materials Production Center (FMPC). Destruction of PCBs and hazardous liquid organic wastes will be accomplished in a rotary kiln incinerator with an afterburner. This system was selected faster a study of various alternatives. Incineration was chosen because it is dependable, permanent, detoxifies organics, and reduces volume. The rotary kiln incinerator was selected because it can thermally destroy organic constituents of liquids, solids, and sludges to produce an organically inert ash. In addition to the incineration off-gas treatment system, the facility includes a tank farm, drum storage buildings, a solids preparation area, a control room, and a data management system. The incineration system, off-gas treatment system, and related instrumentation and controls are being provided by International Waste Energy Systems (IWES) which is responsible for design, construction, startup, and performances testing

  14. Quarterly report of RCRA groundwater monitoring data for period October 1, 1992--December 31, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 CFR 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. Long-term laboratory contracts were approved on October 22, 1991. DataChem Laboratories of Salt Lake City, Utah, performs the hazardous chemicals analyses for the Hanford Site. Analyses for coliform bacteria are performed by Columbia/Biomedical Laboratories and for dioxin by TMS Analytical Services, Inc. International Technology Analytical Services Richland, Washington performs the radiochemical analyses. This quarterly report contains data that were received prior to March 8, 1993. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported

  15. State Energy Program Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    Office of Building Technology, State and Community Programs

    1999-03-17

    The State Energy Program Operations Manual is a reference tool for the states and the program officials at the U.S. Department of Energy's Office of Building Technology, State and Community Programs and Regional Support Offices as well as State Energy Offices. The Manual contains information needed to apply for and administer the State Energy Program, including program history, application rules and requirements, and program administration and monitoring requirements.

  16. Issues in radioactive mixed waste compliance with RCRA [Resource Conservation and Recovery Act]: Some examples from ongoing operations at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Eaton, D.L.; Smith, T.H.; Clements, T.L. Jr.; Hodge, V.

    1990-01-01

    Radioactive mixed waste is subject to regulation under both the Resource Conservation and Recovery Act (RCRA) and the Atomic Energy Act (AEA). The regulation of such waste is the responsibility of the Environmental Protection Agency (EPA) and either the Nuclear Regulatory Commission (NRC) or the Department of Energy (DOE), depending on whether the waste is commercially generated or defense-related. The recent application of the RCRA regulations to ongoing operations at the DOE's Idaho National Engineering Laboratory (INEL) are described in greater detail. 8 refs., 2 figs

  17. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order; TOPICAL

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system

  18. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  19. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc

  20. RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-04-01

    This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

  1. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    International Nuclear Information System (INIS)

    ROGERS, P.M.

    2000-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted

  2. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  3. 78 FR 73525 - Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund...

    Science.gov (United States)

    2013-12-06

    ... Conservation and Recovery Act (RCRA). Many state programs also offer accompanying financial incentive programs... states and tribes that have the management and administrative capacity within their government required... identify the institutional controls relied on in the remedy and include relevant information concerning the...

  4. 76 FR 303 - Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program

    Science.gov (United States)

    2011-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Parts 239 and 258 [EPA-EPA-R10-RCRA-2010-0953; FRL-9247-5] Alaska: Adequacy of Alaska's Municipal Solid Waste Landfill Permit Program AGENCY: Environmental... modification of its approved Municipal Solid Waste Landfill (MSWLF) permit program. On March 22, 2004, EPA...

  5. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2010-07-19

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  6. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    International Nuclear Information System (INIS)

    2010-01-01

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  7. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  8. 77 FR 71344 - Texas: Final Authorization of State-initiated Changes and Incorporation by Reference of State...

    Science.gov (United States)

    2012-11-30

    ... adverse written comment on the codification of the Texas authorized RCRA program by the close of business... Business Information (CBI) or other information whose disclosure is restricted by statute. Do not submit...) introductory paragraph 40 CFR 270.42(a)(1) intro. 30 TAC 305.69(b)(1)(A), except for 40 CFR 270.42(a)(1)(i...

  9. The elimination of chlorinated, chlorofluorocarbon, and other RCRA hazardous solvents from the Y-12 Plant's enriched uranium operations

    International Nuclear Information System (INIS)

    Johnson, D.H.; Patton, R.L.; Thompson, L.M.

    1990-01-01

    A major driving force in waste minimization within the plant is the reduction of mixed radioactive wastes associated with operations on highly enriched uranium. High enriched uranium has a high concentration of the uranium-235 isotope (up to 97.5% enrichment) and is radioactive, giving off alpha and low level gamma radiation. The material is fissionable with as little as two pounds dissolved in water being capable of producing a spontaneous chain reaction. For these reasons the material is processed in small batches or small geometries. Additionally, the material is completely recycled because of its strategic and monetary value. Since the early eighties, the plant has had an active waste minimization program which has concentrated on substitution of less hazardous solvents wherever possible. The following paper summarizes efforts in two areas - development of a water-based machining coolant to replace perchloroethylene and substitution of an aliphatic solvent to replace solvents producing hazardous wastes as defined by the Resource, Conservation, and Recovery Act (RCRA)

  10. 76 FR 12283 - Texas: Final Authorization of State-initiated Changes and Incorporation by Reference of State...

    Science.gov (United States)

    2011-03-07

    ... written comment on the codification of the Texas authorized RCRA program by the close of business April 6.... 30 TAC 305.45(a)(8) intro.--(a)(8)(B).. 40 CFR 270.13(l) related. 30 TAC 305.50(a)(6) 40 CFR 270.17(b.... The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory...

  11. RCRA Programmatic Information Policy and Guidance

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes program policy and guidance documents that are used by the EPA regions, states, tribes and private parties to implement the hazardous waste...

  12. 78 FR 70225 - West Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2013-11-25

    ... 04. 45-25-1.1.a, 45-25- Trucks, Revision Checklist 1.5.a/Table 25-A, 205. Item 9. RCRA Cluster XV...- Pigments, and Food, Drug, and 70 FR 35032, 6/ 10.1. Cosmetic Colorants, Revision 16/05. Checklist 206...

  13. An example of system integration for RCRA policy analysis

    International Nuclear Information System (INIS)

    Tonn, B.; Goeltz, R.; Schmidt, K.

    1991-01-01

    This paper describes the synthesis of various computer technologies and software systems used on a project to estimate the costs of remediating Solid Waste Management Units (SWMUs) that fall under the corrective action provisions of the Resource Conservation and Recovery Act (RCRA). The project used two databases collected by Research Triangle Institute (RTI) that contain information on SWMUs and a PC-based software system called CORA that develops cost estimates for remediating SWMUs. The project team developed rules to categorize every SWMU in the databases by the kinds of technologies required to clean them up. These results were input into CORA, which estimated costs associated with the technologies. Early on, several computing challenges presented themselves. First, the databases have several hundred thousand records each. Second, the categorization rules could not be written to cover all combinations of variables. Third, CORA is run interactively and the analysis plan called for running CORA tens of thousands of times. Fourth, large data transfers needed to take place between RTI and Oak Ridge National Laboratory. Solutions to these problems required systems integration. SWMU categorization was streamlined by using INTERNET as was the data transfer. SAS was used to create files used by a program called SuperKey that was used to run CORA. Because the analysis plan required the generation of hundreds of thousands of cost estimates, memory management software was needed to allow the portable IBM P70 to do the job. During the course of the project, several other software packages were used, including: SAS System for Personal Computers (SAS/PC), DBase III, LOTUS 1-2-3, PIZAZZ PLUS, LOTUS Freelance Plus, and Word Perfect. Only the comprehensive use of all available hardware and software resources allowed this project to be completed within the time and budget constraints. 5 refs., 3 figs., 3 tabs

  14. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  15. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the

  16. Low-level waste program technical strategy

    International Nuclear Information System (INIS)

    Bledsoe, K.W.

    1994-01-01

    The Low-Level Waste Technical Strategy document describes the mechanisms which the Low-Level Waste Program Office plans to implement to achieve its mission. The mission is to manage the receipt, immobilization, packaging, storage/disposal and RCRA closure (of the site) of the low-level Hanford waste (pretreated tank wastes) in an environmentally sound, safe and cost-effective manner. The primary objective of the TWRS Low-level waste Program office is to vitrify the LLW fraction of the tank waste and dispose of it onsite

  17. 77 FR 34229 - Idaho: Final Authorization of State Hazardous Waste Management Program; Revision

    Science.gov (United States)

    2012-06-11

    ... waste regulated under RCRA. In 2003, EPA proposed the sector as an enforcement priority for fiscal years...) Amendments (73 FR 18970, April 8, 2008); F019 Exemption for Wastewater Treatment Sludges from Auto... Comparable Fuel Exclusion (75 FR 33712, June 15, 2010). The federal regulation for the Export of Shipments of...

  18. State Program Integrity Assessment (SPIA)

    Data.gov (United States)

    U.S. Department of Health & Human Services — The State Program Integrity Assessment (SPIA) is the Centers for Medicare and Medicaid Services (CMS) first national data collection on state Medicaid program...

  19. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    International Nuclear Information System (INIS)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O'Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah Sd.

    2001-01-01

    The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is the first in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from RCRA borehole bore samples and composite samples. Intact cores from two RCRA boreholes (299-W22-48 and 299-W22-50) near the SX Tank Farm and four, large-quantity grab samples from outcrop sediment on and off the Hanford Site were sampled to better understand the fate of contaminants in the vadose zone beneath underground storage tanks at the Hanford Site. Borehole and outcrop samples analyzed for this report are located outside the tank farms, and therefore may be considered standard or background samples from which to compare contaminated sediments within the tank farms themselves. This report presents our interpretation of the physical, chemical, and mineralogical properties of the uncontaminated vadose zone sediments, and variations in the vertical distribution of these properties. The information presented in this report is intended to support preparation of the S-SX Field Investigation Report to be prepared by CH2M Hill Hanford Group, Inc. as well as future remediation actions at the S-SX Tank Farm

  20. Penn State DOE GATE Program

    Energy Technology Data Exchange (ETDEWEB)

    Anstrom, Joel

    2012-08-31

    The Graduate Automotive Technology Education (GATE) Program at The Pennsylvania State University (Penn State) was established in October 1998 pursuant to an award from the U.S. Department of Energy (U.S. DOE). The focus area of the Penn State GATE Program is advanced energy storage systems for electric and hybrid vehicles.

  1. Temporal trend analysis of RCRA groundwater monitoring data

    International Nuclear Information System (INIS)

    Need, E.A.

    1994-01-01

    Statistical analysis of RCRA groundwater monitoring data at a uranium hexafluoride processing facility showed a statistically significant increase in the concentration of gross beta activity in monitor wells downgradient of surface impounds storing calcium fluoride sludge and high pH water. Because evidence of leakage had not been detected in lysimeters installed beneath the impounds, the operator sought an evaluation of other potential causes of the result, including natural variability. This study determined that all five data sets showed either long-term excursionary (spike-like), or seasonal forms of temporal variation. Gross beta had an upward long-term trend with multiple excursions that almost appeared to be seasonal. Gross alpha had an upward long-term trend with multiple excursions that were clearly not seasonal. Specific conductance had both upward and downward long-term trends but no other variations. pH had a downward long-term trend with multiple excursions that were clearly not seasonal. Fluoride had a downward long-term trend without excursions but with clear seasonal variations. The gross beta result that appeared to be a significant change was a spike event on the upward long-term trend

  2. Alaska State Trails Program

    Science.gov (United States)

    Recreation Search DNR State of Alaska Home Menu Parks Home Alaska State Trails Boating Safety Design and Home / Alaska State Trails Alaska State Trails Program Trails in the Spotlight Glacier Lake and Saddle Trails in Kachemak State Park Glacier Lake A Popular route joins the Saddle and Glacier Lake Trails. The

  3. RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-09-01

    This report provides a detailed summary of the activities carried out to sample groundwater at Waste Area Grouping (WAG) 6. The analytical results for samples collected during Phase 1, Activity 2 of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI) are also presented. In addition, analytical results for Phase 1, activity sampling events for which data were not previously reported are included in this TM. A summary of the groundwater sampling activities of WAG 6, to date, are given in the Introduction. The Methodology section describes the sampling procedures and analytical parameters. Six attachments are included. Attachments 1 and 2 provide analytical results for selected RFI groundwater samples and ORNL sampling event. Attachment 3 provides a summary of the contaminants detected in each well sampled for all sampling events conducted at WAG 6. Bechtel National Inc. (BNI)/IT Corporation Contract Laboratory (IT) RFI analytical methods and detection limits are given in Attachment 4. Attachment 5 provides the Oak Ridge National Laboratory (ORNL)/Analytical Chemistry Division (ACD) analytical methods and detection limits and Resource Conservation and Recovery Act (RCRA) quarterly compliance monitoring (1988--1989). Attachment 6 provides ORNL/ACD groundwater analytical methods and detection limits (for the 1990 RCRA semi-annual compliance monitoring)

  4. Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area T

    International Nuclear Information System (INIS)

    Horton, Duane G; Hodges, Floyd N

    2001-01-01

    This document compiles information of the drilling and construction, well development, pump installation, and sediment and groundwater sampling applicable to the installation of five new RCRA wells in calendar year 2000 - 2001. Appendix A contains the Well Summary Sheets (as-built diagrams); the Well Construction Summary Reports, and the geologist's logs; Appendix B contains physical properties data; and Appendix C contains the borehole geophysical logs

  5. 77 FR 65314 - Missouri: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-10-26

    ... application, subject to the limitations of the Hazardous and Solid Waste Amendments of 1984 (HSWA). New... RCRA Cluster XI NESHAPS: Final Standards for 65 FR 42292, 07/10/ 10 CSR 25- Hazardous Air Pollutants 00... 66 FR 35087, 7/ *10 CSR 25- Checklist 188. 03/01. 7.7270(2)(D)6 is excluded from the authorization...

  6. 77 FR 69788 - Colorado: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-11-21

    .... EPA-R08-RCRA-2012-0396 at the Region 8 EPA Library, 1595 Wynkoop Street, Denver, Colorado 80202-1129 during the Library's normal hours of operation, Monday through Thursday, 8:00 a.m. to 4:00 p.m... homepage at http://www.epa.gov/epahome/dockets.htm . Docket: All documents in the docket are listed in the...

  7. First annual report RCRA post-closure monitoring and inspections for the U-3fi waste unit. Final report, July 1995--October 1996

    International Nuclear Information System (INIS)

    Emer, D.F.

    1997-01-01

    This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the U-3fi RCRA Unit, located in Area 3 of the Nevada Site (NTS), Nye County, Nevada during the July 1995 to October 1996 period. Inspections of the U-3fi RCRA Unit are conducted to determine and document the physical condition of the covers, facilities, and any unusual conditions that could impact the proper operation of the waste unit closure. The objective of the neutron logging is to monitor the soil moisture conditions along the 420 ft ER3-3 borehole and detect changes that may be indicative of moisture movement in the regulated interval. This is the first annual report on the U-3fi closure and includes the first year baseline monitoring data as well as one quarter of compliance monitoring data

  8. 40 CFR 122.26 - Storm water discharges (applicable to State NPDES programs, see § 123.25).

    Science.gov (United States)

    2010-07-01

    ... under interim status or a permit under subtitle C of RCRA; (v) Landfills, land application sites, and... vehicle maintenance (including vehicle rehabilitation, mechanical repairs, painting, fueling, and... sewer system. (20) Uncontrolled sanitary landfill means a landill or open dump, whether in operation or...

  9. 40 CFR 96.40 - State trading program budget.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State trading program budget. 96.40... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS NOX Allowance Allocations § 96.40 State trading program budget. The State trading program budget...

  10. State Program Integrity Reviews

    Data.gov (United States)

    U.S. Department of Health & Human Services — State program integrity reviews play a critical role in how CMS provides effective support and assistance to states in their efforts to combat provider fraud and...

  11. Analyze Trends: State Hazardous Waste Dashboard | ECHO ...

    Science.gov (United States)

    ECHO, Enforcement and Compliance History Online, provides compliance and enforcement information for approximately 800,000 EPA-regulated facilities nationwide. ECHO includes permit, inspection, violation, enforcement action, and penalty information about facilities regulated under the Clean Air Act (CAA) Stationary Source Program, Clean Water Act (CWA) National Pollutant Elimination Discharge System (NPDES), and/or Resource Conservation and Recovery Act (RCRA). Information also is provided on surrounding demographics when available.

  12. 3 CFR - State Children's Health Insurance Program

    Science.gov (United States)

    2010-01-01

    ... 3 The President 1 2010-01-01 2010-01-01 false State Children's Health Insurance Program... Insurance Program Memorandum for the Secretary of Health and Human Services The State Children's Health Insurance Program (SCHIP) encourages States to provide health coverage for uninsured children in families...

  13. Feasibility study of X-ray K-edge analysis of RCRA heavy metal contamination of sludge packaged in drums

    International Nuclear Information System (INIS)

    Jensen, T.

    1999-01-01

    A study has been completed to assess the capabilities of X-ray K-edge analysis in the measurement of RCRA metal contamination of sludge packaged in drums. Results were obtained for mercury and lead contamination. It was not possible to measure cadmium contamination using this technique. No false positive signals were observed. In cases where uniformity of the sludge can be assumed, this analysis can provide a quick, accurate measurement of heavy-metal contamination

  14. The Rocky Flats Plant Waste Stream and Residue Identification and Characterization Program (WSRIC): Progress and achievements

    International Nuclear Information System (INIS)

    Ideker, V.L.

    1994-01-01

    The Waste Stream and Residue Identification and Characterization (WSRIC) Program, as described in the WSRIC Program Description delineates the process knowledge used to identify and characterize currently-generated waste from approximately 5404 waste streams originating from 576 processes in 288 buildings at Rocky Flats Plant (RFP). Annual updates to the WSRIC documents are required by the Federal Facilities Compliance Agreement between the US Department of Energy, the Colorado Department of Health and the Environmental Protection Agency. Accurate determination and characterization of waste is a crucial component in RFP's waste management strategy to assure compliance with Resource Conservation and Recovery Act (RCRA) storage and treatment requirements, as well as disposal acceptance criteria. The WSRIC Program was rebaselined in September 1992, and serves as the linchpin for documenting process knowledge in RFP's RCRA operating record. Enhancements to the WSRIC include strengthening the waste characterization rationale, expanding WSRIC training for waste generators, and incorporating analytical information into the WSRIC building books. These enhancements will improve credibility with the regulators and increase waste generators' understanding of the basis for credible waste characterizations

  15. Construction of mixed waste storage RCRA facilities, Buildings 7668 and 7669: Environmental assessment

    International Nuclear Information System (INIS)

    1994-04-01

    The Department of Energy has prepared an environmental assessment, DOE/EA-0820, to assess the potential environmental impacts of constructing and operating two mixed waste Resource Conservation and Recovery Act (RCRA) storage facilities. The new facilities would be located inside and immediately west of the security-fenced area of the Oak Ridge National Laboratory Hazardous Waste Management Area in Melton Valley, Tennessee. Based on the analyses in the environmental assessment, the Department has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Therefore, the preparation of an environmental impact statement is not required, and the Department is issuing this finding of no significant impact

  16. Expediting Groundwater Sampling at Hanford and Making It Safer

    International Nuclear Information System (INIS)

    Connell, Carl W. Jr.; Carr, Jennifer S.; Hildebrand, R. Douglas; Schatz, Aaron L.; Conley, S. F.; Brown, W. L.

    2013-01-01

    The CH2M HILL Plateau Remediation Company (CHPRC) manages the groundwater monitoring programs at the Department of Energy's 586-square-mile Hanford site in southeastern Washington state. These programs are regulated by the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), and the Atomic Energy Act (AEA). The purpose of monitoring is to track existing groundwater contamination from past practices, as well as other potential contamination that might originate from RCRA treatment, storage, and disposal (TSD) facilities. An integral part of the groundwater-monitoring program involves taking samples of the groundwater and measuring the water levels in wells scattered across the site. Each year, more than 1,500 wells are accessed for a variety of reasons

  17. Installation Restoration Program. Phase I. Records Search. Vandenberg Air Force Base, California.

    Science.gov (United States)

    1984-12-01

    acidity or alkalinity POL Petroleum, oils, and lubricants PVC Polyvinyl chloride plastic RCRA Resource Conservation and Recovery Act RP-1 Rocket propellant...multiplter: Subscore 3 K ?hvsical State ulriptier Waste Caracteristics Subscore 50 X 1 50 11-1. CS-I HAZARD ASSESSMENT RATING METHODOLOGY FORM (Continued

  18. Sulfur polymer cement encapsulation of RCRA toxic metals and metal oxides

    International Nuclear Information System (INIS)

    Calhoun, C.L. Jr.; Nulf, L.E.; Gorin, A.H.

    1995-06-01

    A study was conducted to determine the suitability of Sulfur Polymer Cement (SPC) encapsulation technology for the stabilization of RCRA toxic metal and metal oxide wastes. In a series of bench-scale experiments, the effects of sodium sulfide additions to the waste mixture, residence time, and temperature profile were evaluated. In addition, an effort was made to ascertain the degree to which SPC affords chemical stabilization as opposed to physical encapsulation. Experimental results have demonstrated that at the 25 wt % loading level, SPC can effectively immobilize Cr, Cr 2 O 3 , Hg, Pb, and Se to levels below regulatory limits. SPC encapsulation also has been shown to significantly reduce the leachability of other toxic compounds including PbO, PbO 2 , As 2 O 3 , BaO, and CdO. In addition, data has confirmed sulfide conversion of Hg, Pb, PbO, PbO 2 , and BaO as the product of their reaction with SPC

  19. Savannah River Site RCRA Facility Investigation plan: Road A Chemical Basin

    International Nuclear Information System (INIS)

    1989-06-01

    The nature of wastes disposed of at the Road A Chemical Basin (RACB) is such that some degree of soil contamination is probable. Lead has also been detected in site monitoring wells at concentrations above SRS background levels. A RCRA Facility Investigation (RFI) is proposed for the RACB and will include a ground penetrating radar (GPR) survey, collection and chemical and radiological analyses of soil cores, installation of groundwater monitoring wells, collection and chemical and radiological analyses of groundwater samples, and collection of chemical and radiological analyses of surface water and sediment samples. Upon completion of the proposed RFI field work and chemical and radiological analyses, and RFI report should be prepared to present conclusions on the nature and extent of contamination at the site, and to make recommendations for site remediation. If contamination is detected at concentrations above SRS background levels, a receptor analysis should be done to evaluate potential impacts of site contamination on nearby populations

  20. RCRA facility investigation for the townsite of Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    Dorries, A.M.; Conrad, R.C.; Nonno, L.M.

    1992-01-01

    During World War II, Los Alamos, New Mexico was established as an ideal location for the secrecy and safety needed for the research and development required to design a nuclear fission bomb. Experiments carried out in the 1940s generated both radioactive and hazardous waste constituents on what is presently part of the Los Alamos townsite. Under the RCRA permit issued to Los alamos national Laboratory in 1990, the Laboratory is scheduled for investigation of its solid waste management units (SWMUs). The existing information on levels of radioactivity on the townsite is principally data from soil samples taken during the last site decontamination in 1976, little information on the presence of hazardous constituents exists today. This paper addresses pathway analysis and a preliminary risk assessment for current residents of the Los Alamos townsite. The estimated dose levels, in mrem per year, show that the previously decontaminated SWMU areas on the Los Alamos townsite will not contribute a radiation dose of any concern to the current residents

  1. State Energy Program Fact Sheet

    Energy Technology Data Exchange (ETDEWEB)

    None

    2018-02-01

    The U.S. Department of Energy’s State Energy Program (SEP) provides funding and technical assistance to states, territories, and the District of Columbia to enhance energy security, advance state-led energy initiatives, and maximize the benefits of decreasing energy waste.

  2. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  3. Regulatory requirements of the integrated technology demonstration program, Savannah River Site (U)

    International Nuclear Information System (INIS)

    Bergren, C.L.

    1992-01-01

    The integrated demonstration program at the Savannah River Site (SRS) involves demonstration, testing and evaluation of new characterization, monitoring, drilling and remediation technologies for soils and groundwater impacted by organic solvent contamination. The regulatory success of the demonstration program has developed as a result of open communications between the regulators and the technical teams involved. This open dialogue is an attempt to allow timely completion of applied environmental restoration demonstrations while meeting all applicable regulatory requirements. Simultaneous processing of multiple regulatory documents (satisfying RCRA, CERCLA, NEPA and various state regulations) has streamlined the overall permitting process. Public involvement is achieved as various regulatory documents are advertised for public comment consistent with the site's community relations plan. The SRS integrated demonstration has been permitted and endorsed by regulatory agencies, including the Environmental Protection Agency (EPA) and the South Carolina Department of Health and Environmental Control. EPA headquarters and regional offices are involved in DOE's integrated Demonstration Program. This relationship allows for rapid regulatory acceptance while reducing federal funding and time requirements. (author)

  4. New England States environmental radiation surveillance programs

    International Nuclear Information System (INIS)

    Molloy, E.J.

    1980-01-01

    An overview of the environmental radiation surveillance programs in the New England States from the viewpoint of their organization and administration is provided. Moreover, the specific monitoring and analytical programs conducted at selected sites in each state is detailed with emphasis on sample types, collection frequencies, and analysis. Also, a comparison is made between the programs of all the states in order to determine the reasons for their differences

  5. Proceedings of the Department of Energy Defense Programs hazardous and mixed waste minimization workshop: Hazardous Waste Remedial Actions Program

    International Nuclear Information System (INIS)

    1988-09-01

    The first workshop on hazardous and mixed waste minimization was held in Las Vegas, Nevada, on July 26--28, 1988. The objective of this workshop was to establish an interchange between DOE headquarters (DOE-HQ) DP, Operations Offices, and contractors of waste minimization strategies and successes. The first day of the workshop began with presentations stressing the importance of establishing a waste minimization program at each site as required by RCRA, the land ban restrictions, and the decrease in potential liabilities associated with waste disposal. Discussions were also centered on pending legislation which would create an Office of Waste Reduction in the Environmental Protection Agency (EPA). The Waste Minimization and Avoidance Study was initiated by DOE as an addition to the long-term productivity study to address the issues of evolving requirements facing RCRA waste management activities at the DP sites, to determine how major operations will be affected by these requirements, and to determine the available strategies and options for waste minimization and avoidance. Waste minimization was defined in this study as source reduction and recycling

  6. State Employee Assistance Programs: Organization and Services.

    Science.gov (United States)

    Kemp, Donna R.

    1985-01-01

    Describes a study conducted to determine how many state governments had established employee assistance programs (EAPs). Results concerned how state EAPs are organized, services provided, cost of programs, what dollars or productive benefits were calculated, and what problems have been encountered by state EAPs. (CT)

  7. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  8. Continuous Improvement in State Funded Preschool Programs

    Science.gov (United States)

    Jackson, Sarah L.

    2012-01-01

    State funded preschool programs were constantly faced with the need to change in order to address internal and external demands. As programs engaged in efforts towards change, minimal research was available on how to support continuous improvement efforts within the context unique to state funded preschool programs. Guidance available had…

  9. An Evaluation of State Energy Program Accomplishments: 2002 Program Year

    Energy Technology Data Exchange (ETDEWEB)

    Schweitzer, M.

    2005-07-13

    The U.S. Department of Energy's (DOE's) State Energy Program (SEP) was established in 1996 by merging the State Energy Conservation Program (SECP) and the Institutional Conservation Program (ICP), both of which had been in existence since 1976 (U.S. DOE 2001a). The SEP provides financial and technical assistance for a wide variety of energy efficiency and renewable energy activities undertaken by the states and territories. SEP provides money to each state and territory according to a formula that accounts for population and energy use. In addition to these ''Formula Grants'', SEP ''Special Project'' funds are made available on a competitive basis to carry out specific types of energy efficiency and renewable energy activities (U.S. DOE 2003c). The resources provided by DOE typically are augmented by money and in-kind assistance from a number of sources, including other federal agencies, state and local governments, and the private sector. The states SEP efforts include several mandatory activities, such as establishing lighting efficiency standards for public buildings, promoting car and vanpools and public transportation, and establishing policies for energy-efficient government procurement practices. The states and territories also engage in a broad range of optional activities, including holding workshops and training sessions on a variety of topics related to energy efficiency and renewable energy, providing energy audits and building retrofit services, offering technical assistance, supporting loan and grant programs, and encouraging the adoption of alternative energy technologies. The scope and variety of activities undertaken by the various states and territories is extremely broad, and this reflects the diversity of conditions and needs found across the country and the efforts of participating states and territories to respond to them. The purpose of this report is to present estimates of the energy and

  10. State heating oil and propane program

    International Nuclear Information System (INIS)

    1991-01-01

    The following is a report of New Hampshire's participation in the State Heating Oil and Propane Program (SHOPS) for the 1990--91 heating season. The program is a joint effort between participating states and the Department of Energy (DOE), Energy Information Administration (EYE) to collect retail price data for heating oil and propane through phone surveys of 25 oil and 20 propane retailers in New Hampshire. SHOPS is funded through matching grants from DOE and the participating state. (VC)

  11. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.

  12. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specified in Title 40, Code of Federal Regulations (CFR) section 270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below

  13. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    International Nuclear Information System (INIS)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG ampersand G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory's (INEL's) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG ampersand G Idaho is responsible concerning the INEL WETP. Even though EG ampersand G Idaho has no responsibility for the work that ANL-W is performing, EG ampersand G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and

  14. Performance Demonstration Program Plan for Nondestructive Assay of Drummed Wastes for the TRU Waste Characterization Program

    International Nuclear Information System (INIS)

    2009-01-01

    Each testing and analytical facility performing waste characterization activities for the Waste Isolation Pilot Plant (WIPP) participates in the Performance Demonstration Program (PDP) to comply with the Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WAC) (DOE/WIPP-02-3122) and the Quality Assurance Program Document (QAPD) (CBFO-94-1012). The PDP serves as a quality control check for data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed to each of the facilities participating in the PDP. The PDP evaluates analyses of simulated headspace gases, constituents of the Resource Conservation and Recovery Act (RCRA), and transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques.

  15. RCRA corrective measures using a permeable reactive iron wall US Coast Guard Support Center, Elizabeth City, North Carolina

    International Nuclear Information System (INIS)

    Schmithors, W.L.; Vardy, J.A.

    1997-01-01

    A chromic acid release was discovered at a former electroplating shop at the U.S. Coast Guard Support Center in Elizabeth City, North Carolina. Initial investigative activities indicated that chromic acid had migrated into the subsurface soils and groundwater. In addition, trichloroethylene (TCE) was also discovered in groundwater during subsequent investigations of the hexavalent chromium (Cr VI) plume. Corrective measures were required under the Resource Conservation and Recovery Act (RCRA). The in-situ remediation method, proposed under RCRA Interim Measures to passively treat the groundwater contaminants, uses reactive zero-valent iron to reductively dechlorinate the chlorinated compounds and to mineralize the hexavalent chromium. A 47 meter by 0.6 meter subsurface permeable iron wall was installed downgradient of the source area to a depth of 7 meters using a direct trenching machine. The iron filings were placed in the ground as the soils were excavated from the subsurface. This is the first time that direct trenching was used to install reactive zero-valent iron filings. Over 250 metric tons of iron filings were used as the reactive material in the barrier wall. Installation of the iron filings took one full day. Extensive negotiations with regulatory agencies were required to use this technology under the current facility Hazardous Waste Management Permit. All waste soils generated during the excavation activities were contained and treated on site. Once contaminant concentrations were reduced the waste soils were used as fill material

  16. State Enterprise Zone Programs: Have They Worked?

    Science.gov (United States)

    Peters, Alan H.; Fisher, Peter S.

    The effectiveness of state enterprise zone programs was examined by using a hypothetical-firm model called the Tax and Incentives Model-Enterprise Zones (TAIM-ez) model to analyze the value of enterprise zone incentives to businesses across the United States and especially in the 13 states that had substantial enterprise zone programs by 1990. The…

  17. Resource Conservation and Recovery Act (RCRA) Part B Permit Application for Production Associated Units at the Oak Ridge Y-12 Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This is the RCRA required permit application for Radioactive and Hazardous Waste Management at the Oak Ridge Y-12 Plant for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; Cyanide Treatment Unit. All four of these units are associated with the recovery of enriched uranium and other metals from wastes generated during the processing of nuclear materials.

  18. Resource Conservation and Recovery Act (RCRA) Part B Permit Application for Production Associated Units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-09-01

    This is the RCRA required permit application for Radioactive and Hazardous Waste Management at the Oak Ridge Y-12 Plant for the following units: Building 9206 Container Storage Unit; Building 9212 Container Storage Unit; Building 9720-12 Container Storage Unit; Cyanide Treatment Unit. All four of these units are associated with the recovery of enriched uranium and other metals from wastes generated during the processing of nuclear materials

  19. RCRA Facilities Assessment (RFA), Oak Ridge National Laboratory, container storage accumulation areas

    International Nuclear Information System (INIS)

    1987-01-01

    The Oak Ridge National Laboratory (ORNL) remedial action strategy is based on a memorandum from the Environmental Protection Agency (EPA) to the Department of Energy (DOE) in which EPA elected to enforce regulatory requirements for ORNL through its amended Resource Conservation and Recovery Act (RCRA) authority. This report, which completes the requirements of II.A.1 of the Hazardous and Solid Waste Amendments (HSWA) permit, identifies areas near the point of waste generation in which wastes are accumulated before they are transferred into the permitted waste storage facilities. In includes background information on each area and an assessment of the need for further remedial attention. The waste accumulation areas described in this addendum bear identification numbers indicative of the WAGs of which they are a part. Waste accumulation areas that are located inside a building and in which there is no potential for releases to the environment are not included in this report

  20. Options for improving hazardous waste cleanups using risk-based criteria

    International Nuclear Information System (INIS)

    Elcock, D.

    1995-01-01

    This paper explores how risk- and technology-based criteria are currently used in the RCRA and CERCLA cleanup programs. It identifies ways in which risk could be further incorporated into RCRA and CERCLA cleanup requirements and the implications of risk-based approaches. The more universal use of risk assessment as embodied in the risk communication and risk improvement bills before Congress is not addressed. Incorporating risk into the laws and regulations governing hazardous waste cleanup, will allow the use of the best scientific information available to further the goal of environmental protection in the United States while containing costs. and may help set an example for other countries that may be developing cleanup programs, thereby contributing to enhanced global environmental management

  1. Technical resource documents and technical handbooks for hazardous-wastes management

    Energy Technology Data Exchange (ETDEWEB)

    Schomaker, N.B.; Bliss, T.M.

    1986-07-01

    The Environmental Protection Agency is preparing a series of Technical Resource Documents (TRD's) and Technical Handbooks to provide best engineering control technology to meet the needs of the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) respectively. These documents and handbooks are basically compilation of research efforts of the Land Pollution Control Division (LPCD) to date. The specific areas of research being conducted under the RCRA land disposal program relate to laboratory, pilot and field validation studies in cover systems, waste leaching and solidification, liner systems and disposal facility evaluation. The technical handbooks provide the EPA Program Offices and Regions, as well as the states and other interested parties, with the latest information relevant to remedial actions.

  2. 7 CFR 785.3 - Annual certification of State mediation programs.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Annual certification of State mediation programs. 785... AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS CERTIFIED STATE MEDIATION PROGRAM § 785.3 Annual certification of State mediation programs. To obtain FSA certification of the State's mediation program, the...

  3. Mixed waste removal from a hazardous waste storage tank

    International Nuclear Information System (INIS)

    Geber, K.R.

    1993-01-01

    The spent fuel transfer canal at the Oak Ridge Graphite Reactor was found to be leaking 400 gallons of water per day into the surrounding soil. Sampling of the sediment layer on the floor of the canal to determine the environmental impact of the leak identified significant radiological contamination and elevated levels of cadmium and lead which are hazardous under the Resource Conservation and Recovery Act (RCRA). Under RCRA regulations and Rules of Tennessee Department of Environment and Conservation, the canal was considered a hazardous waste storage tank. This paper describes elements of the radiological control program established in support of a fast-track RCRA closure plan that involved underwater mapping of the radiation fields, vacuuming, and ultra-filtration techniques that were successfully used to remove the mixed waste sediments and close the canal in a method compliant with state and federal regulations

  4. 7 CFR 785.4 - Grants to certified State mediation programs.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Grants to certified State mediation programs. 785.4..., DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS CERTIFIED STATE MEDIATION PROGRAM § 785.4 Grants to certified State mediation programs. (a) Eligibility. To be eligible to receive a grant, a State mediation program...

  5. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110

  6. RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Central Shops Burning/Rubble Pit (631-6G), Volume 1 Final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    The Burning/Rubble Pits at the Savannah River Site were usually shallow excavations approximately 3 to 4 meters in depth. Operations at the pits consisted of collecting waste on a continuous basis and burning on a monthly basis. The Central Shops Burning/Rubble Pit 631- 6G (BRP6G) was constructed in 1951 as an unlined earthen pit in surficial sediments for disposal of paper, lumber, cans and empty galvanized steel drums. The unit may have received other materials such as plastics, rubber, rags, cardboard, oil, degreasers, or drummed solvents. The BRP6G was operated from 1951 until 1955. After disposal activities ceased, the area was covered with soil. Hazardous substances, if present, may have migrated into the surrounding soil and/or groundwater. Because of this possibility, the United States Environmental Protection Agency (EPA) has designated the BRP6G as a Solid Waste Management Unit (SWMU) subject to the Resource Conservation Recovery Act/Comprehensive Environmental Response, Compensation and Liability Act (RCRA/CERCLA) process.

  7. Annual Report RCRA Post-Closure Monitoring and Inspections for CAU 112: Area 23 Hazardous Waste Trenches, Nevada Test Site, Nevada, for the period October 2000-July 2001

    International Nuclear Information System (INIS)

    Tobiason, D. S.

    2002-01-01

    This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the Area 23 Hazardous Waste Trenches Resource Conservation and Recovery Act (RCRA) unit, located in Area 23 of the Nevada Test Site, Nye County, Nevada, during the October 2000--July 2001 monitoring period. Inspections of the Area 23 Hazardous Waste Trenches RCRA unit are conducted to determine and document the physical condition of the covers, facilities, and any unusual conditions that could impact the proper operation of the waste unit closure. Physical inspections of the closure were completed quarterly and indicated that the site is in good condition with no significant findings noted. An annual subsidence survey of the elevation markers was conducted in July 2001. There has been no subsidence at any of the markers since monitoring began eight years ago. Precipitation for the period October 2000 through July 2001 was 9.42 centimeters (cm) (3.71 inches [in]) (U.S. National Weather Service, 2001). The prior year annual rainfall (January 2000 through December 2000) was 10.44 cm (4.1 1 in.). The recorded average annual rainfall for this site from 1972 to January 2000 is 14.91 cm (5.87 in.). The objective of the neutron logging program is to monitor the soil moisture conditions along 30 neutron access tubes and detect changes that may be indicative of moisture movement at a point located directly beneath each trench. All monitored access tubes are within the compliance criteria of less than 5 percent residual volumetric moisture content at the compliance point directly beneath each respective trench. Soil conditions remain dry and stable underneath the trenches

  8. 40 CFR 147.550 - State-administered program.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Georgia § 147.550...'s program application: (a) Incorporation by reference. The requirements set forth in the State... Hazardous Waste Management Act, O.C.G.A. §§ 12-8-60 through 12-8-83 (1988); (7) Georgia Safe Drinking Water...

  9. RCRA Part B permit modifications for cost savings and increased flexibility at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Jierree, C.; Ticknor, K.

    1996-10-01

    With shrinking budgets and downsizing, a need for streamlined compliance initiatives became evident at the Rocky Flats Environmental Technology Site (RFETS). Therefore, Rocky Mountain Remediation Services (RMRS) at the RFETS successfully and quickly modified the RFETS RCRA Part B Permit to obtain significant cost savings and increased flexibility. This 'was accomplished by requesting operations personnel to suggest changes to the Part B Permit which did not diminish overall compliance and which would be most. cost beneficial. The U.S. Department of Energy (DOE) subsequently obtained approval of those changes from the Colorado Department of Public Health and the Environment (CDPHE)

  10. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document

  11. State Program Integrity Review Reports List

    Data.gov (United States)

    U.S. Department of Health & Human Services — Comprehensive state program integrity (PI) review reports (and respective follow-up review reports) provide CMS assessment of the effectiveness of the states PI...

  12. Y-12 Plant Groundwater Protection Program: Groundwater and surface water sampling and analysis plan for Calendar Year 1998

    International Nuclear Information System (INIS)

    1997-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 1998 at the Department of Energy (DOE) Y-12 Plant. These monitoring activities are managed by the Y-12 Plant Environmental Compliance Organization through the Y-12 Plant Groundwater Protection Program (GWPP). Groundwater and surface water monitoring during CY 1998 will be performed in three hydrogeologic regimes at the Y-12 Plant: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located within Bear Creek Valley, and the Chestnut Ridge Regime is located south of the Y-12 Plant. Groundwater and surface water monitoring will be performed during CY 1998 to comply with: (1) requirements specified in Resource Conservation and Recover Act (RCRA) post-closure permits regarding RCRA corrective action monitoring and RCRA detection monitoring; (2) Tennessee Department of Environment and Conservation regulations governing detection monitoring at nonhazardous solid waste management facilities; and (3) DOE Order 5400.1 surveillance monitoring and exit pathway monitoring. Data from some of the sampling locations in each regime will be used to meet the requirements of more than one of the monitoring drivers listed above. Modifications to the CY 1998 monitoring program may be necessary during implementation. For example, changes in regulatory requirements may alter the parameters specified for selected monitoring wells, or wells could be removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 Plant GWPP manager and documented as addenda to this sampling and analysis plan

  13. Comparison of State-Funded Technology Maturation Programs.

    Energy Technology Data Exchange (ETDEWEB)

    Keller, Elizabeth James Kistin [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Warren, Drake [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hess, Marguerite Evelyn [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-12-01

    This study examines the structure and impact of state-funded technology maturation programs that leverage research institutions for economic development throughout the United States. The lessons learned and practices identified from previous experiences will inform Sandia National Laboratories' Government Relations and Technology Partnerships teams as they participate in near-term discussions about the proposed Technology Readiness Gross Receipts Tax Credit and Program, and continue to shape longer-term program and partnership opportunities. This Page Intentionally Left Blank

  14. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  15. 30 CFR 906.10 - State regulatory program approval.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false State regulatory program approval. 906.10 Section 906.10 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO § 906.10 State...

  16. Reporting Newborn Audiologic Results to State EHDI Programs.

    Science.gov (United States)

    Chung, Winnie; Beauchaine, Kathryn L; Grimes, Alison; O'Hollearn, Tammy; Mason, Craig; Ringwalt, Sharon

    All US states and territories have an Early Hearing Detection and Intervention (EHDI) program to facilitate early hearing evaluation and intervention for infants who are deaf or hard of hearing. To ensure efficient coordination of care, the state EHDI programs rely heavily on audiologists' prompt reporting of a newborn's hearing status. Several states have regulations requiring mandatory reporting of a newborn's hearing status. This is an important public health responsibility of pediatric audiologists. Reasons for failing to report vary. The Early Hearing Detection and Intervention-Pediatric Audiology Links to Services (EHDI) facility survey was used to inform reporting compliance of audiology facilities throughout the United States. The survey was disseminated via articles, newsletters, and call-to-action notices to audiologists. Among 1024 facilities surveyed, 88 (8.6%) reported that they did not report newborn's hearing findings to their state EHDI program. Not knowing how to report to the state EHDI program was the most frequently chosen reason (60%). However, among the 936 facilities that were compliant with the reporting requirements, 51 estimated that they reported less than two-third of all hearing evaluation results (5.4%). Some facilities did not report a normal-hearing result and some failed to report because they assumed another facility would report the hearing results. Survey results indicated that audiologists were compliant reporting hearing results to the state EHDI programs. However, there is room for improvement. Regular provider outreach and training by the state EHDI program is necessary to ensure those who are not reporting will comply and to clarify reporting requirements for those who are already compliant.

  17. 20 CFR 701.401 - Coverage under state compensation programs.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Coverage under state compensation programs...; DEFINITIONS AND USE OF TERMS Coverage Under State Compensation Programs § 701.401 Coverage under state compensation programs. (a) Exclusions from the definition of “employee” under § 701.301(a)(12), and the...

  18. State Energy Program Results: More Projects That Work

    Energy Technology Data Exchange (ETDEWEB)

    1998-12-01

    A Summary of Success stories of the State Energy Programs. The goal of the State Energy Program is to strengthen the capabilities of States to promote energy efficiency and to adopt renewable energy technologies, thereby helping the nation save energy and realize a stronger economy, cleaner environment, and a more secure future.

  19. RCRA materials analysis by laser-induced breakdown spectroscopy: Detection limits in soils

    International Nuclear Information System (INIS)

    Koskelo, A.; Cremers, D.A.

    1994-01-01

    The goal of the Technical Task Plan (TTP) that this report supports is research, development, testing and evaluation of a portable analyzer for RCRA and other metals. The instrumentation to be built will be used for field-screening of soils. Data quality is expected to be suitable for this purpose. The data presented in this report were acquired to demonstrate the detection limits for laser-induced breakdown spectroscopy (LIBS) of soils using instrument parameters suitable for fieldable instrumentation. The data are not expected to be the best achievable with the high pulse energies available in laboratory lasers. The report presents work to date on the detection limits for several elements in soils using LIBS. The elements targeted in the Technical Task Plan are antimony, arsenic, beryllium, cadmium, chromium, lead, selenium, and zirconium. Data for these elements are presented in this report. Also included are other data of interest to potential customers for the portable LIBS apparatus. These data are for barium, mercury, cesium and strontium. Data for uranium and thorium will be acquired during the tasks geared toward mixed waste characterization

  20. Detailed analysis of a RCRA landfill for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-04-01

    The purpose of this detailed analysis is to provide a preliminary compilation of data, information, and estimated costs associated with a RCRA landfill alternative for UNC Disposal Site. This is in response to Environmental Protection Agency (EPA) comment No. 6 from their review of a open-quotes Feasibility Study for the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee.close quotes

  1. 34 CFR 403.70 - How must funds be used under the State Programs and State Leadership Activities?

    Science.gov (United States)

    2010-07-01

    ... State Leadership Activities? 403.70 Section 403.70 Education Regulations of the Offices of the... the Basic Programs? State Programs and State Leadership Activities § 403.70 How must funds be used under the State Programs and State Leadership Activities? A State shall use funds reserved under section...

  2. State Space Reduction for Model Checking Agent Programs

    NARCIS (Netherlands)

    S.-S.T.Q. Jongmans (Sung-Shik); K.V. Hindriks; M.B. van Riemsdijk; L. Dennis; O. Boissier; R.H. Bordini (Rafael)

    2012-01-01

    htmlabstractState space reduction techniques have been developed to increase the efficiency of model checking in the context of imperative programming languages. Unfortunately, these techniques cannot straightforwardly be applied to agents: the nature of states in the two programming paradigms

  3. 45 CFR 235.62 - State plan requirements for training programs.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 2 2010-10-01 2010-10-01 false State plan requirements for training programs. 235... ADMINISTRATION OF FINANCIAL ASSISTANCE PROGRAMS § 235.62 State plan requirements for training programs. A State plan under title I, IV-A, X, XIV, or XVI (AABD) of the Act must provide for a training program for...

  4. Methodologies for estimating one-time hazardous waste generation for capacity generation for capacity assurance planning

    International Nuclear Information System (INIS)

    Tonn, B.; Hwang, Ho-Ling; Elliot, S.; Peretz, J.; Bohm, R.; Hendrucko, B.

    1994-04-01

    This report contains descriptions of methodologies to be used to estimate the one-time generation of hazardous waste associated with five different types of remediation programs: Superfund sites, RCRA Corrective Actions, Federal Facilities, Underground Storage Tanks, and State and Private Programs. Estimates of the amount of hazardous wastes generated from these sources to be shipped off-site to commercial hazardous waste treatment and disposal facilities will be made on a state by state basis for the years 1993, 1999, and 2013. In most cases, estimates will be made for the intervening years, also

  5. 76 FR 19310 - Information Collection; Certified State Mediation Program

    Science.gov (United States)

    2011-04-07

    ... DEPARTMENT OF AGRICULTURE Farm Service Agency Information Collection; Certified State Mediation... supports the Certified State Mediation Program. The information collection is necessary to ensure the grant... submit comments by any of the following methods: Mail: Carol Wagner, Certified State Mediation Program...

  6. An Overview of State Policies Supporting Worksite Health Promotion Programs.

    Science.gov (United States)

    VanderVeur, Jennifer; Gilchrist, Siobhan; Matson-Koffman, Dyann

    2017-05-01

    Worksite health promotion (WHP) programs can reduce the occurrence of cardiovascular disease risk factors. State law can encourage employers and employer-provided insurance companies to offer comprehensive WHP programs. This research examines state law authorizing WHP programs. Quantitative content analysis. Worksites or workplaces. United States (and the District of Columbia). State law in effect in 2013 authorizing WHP programs. Frequency and distribution of states with WHP laws. To determine the content of the laws for analysis and coding, we identified 18 policy elements, 12 from the Centers for Disease Control and Prevention's Worksite Health ScoreCard (HSC) and 6 additional supportive WHP strategies. We used these strategies as key words to search for laws authorizing WHP programs or select WHP elements. We calculated the number and type of WHP elements for each state with WHP laws and selected two case examples from states with comprehensive WHP laws. Twenty-four states authorized onsite WHP programs, 29 authorized WHP through employer-provided insurance plans, and 18 authorized both. Seven states had a comprehensive WHP strategy, addressing 8 or more of 12 HSC elements. The most common HSC elements were weight management, tobacco cessation, and physical activity. Most states had laws encouraging the adoption of WHP programs. Massachusetts and Maine are implementing comprehensive WHP laws but studies evaluating their health impact are needed.

  7. RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-04-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. In January 1993, the Closure Plan was revised to include inspection and maintenance criteria and to reflect that future monitoring and remediation would be conducted as part of the ongoing Comprehensive Environmental Response, Compensation, and Liability Act activities at the Oak Ridge Y-12 Plant. This Closure Plan revision is intended to reflect the placement of the Kerr Hollow Quarry debris at the Walk-In Pits, revise the closure dates, and acknowledge that the disposition of a monitoring well within the closure site cannot be verified

  8. 40 CFR 239.4 - Narrative description of state permit program.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Narrative description of state permit program. 239.4 Section 239.4 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Narrative description of state permit program. The description of a state's program must include: (a) An...

  9. INSPTRAX - The Inspection Targeting, Planning and Tracking Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The INSPTRAX System tracks Air, RCRA, and Water inspection targeting, planning and tracking information. It is used by the the Air, RCRA, and Water programs to input...

  10. A RCRA clean closure of a unique site - Kerr Hollow quarry at the Y-12 Plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Yemington, C.

    1991-01-01

    An abandoned rock quarry, Kerr Hollow Quarry (KHQ), near the DOE Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, was used from 1951-1988 as a site to treat RCRA wastes which were reactive, corrosive, or ignitable and which posed major concerns for personnel safety. The wastes were generated from operations at the Y-12 Plant and Oak Ridge National Laboratory and were previously treated by allowing the wastes to react with the water in KHQ. When closure of the site was required by the RCRA regulations, a closure method was selected to allow for clean closure of the quarry without treatment or removal of the water in KHQ. The method proposed to and approved by the Tennessee Department of Health and Environment (TDHE) was one of surveying the containers in the quarry by a submersible Remotely Operated Vehicle (ROV) using sonar and visually inspecting the containers by camera to confirm that all containers are breached and empty. Any container found intact would be breached to allow the contents to react with water and form non-hazardous residue. The progress of this unique type of closure is presented along with a summary of the problems encountered, planning activities, equipment utilized and other information about the closure. All work was done with remotely operated equipment. This work is being performed by Sonsub, Inc. This closure project showed the practicality and cost benefits of telerobotic systems for work on hazardous waste sites. In addition to the intangible benefit of reduced exposure of workers, insurance costs are much lower and efficiency is higher. Daily start-up time is reduced since there is no need to don protective suits or other gear. Productivity is higher since personnel work only in clean areas where they are not hampered by protective gear. Cleanup time at shift end is minimized since the remote equipment does not leave the hazardous area and personnel need not go through decontamination

  11. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  12. The New York State Bird Conservation Area (BCA) Program: A Model for the United States

    Science.gov (United States)

    M. F. Burger; D. J. Adams; T. Post; L. Sommers; B. Swift

    2005-01-01

    The New York State Bird Conservation Area (BCA) Program, modeled after the National Audubon Society?s Important Bird Areas Program, is based on legislation signed by Governor Pataki in 1997. New York is the first state in the nation to enact such a program. The BCA Program seeks to provide a comprehensive, ecosystem approach to conserving birds and their habitats on...

  13. RCRA permitting strategies for the development of innovative technologies: Lessons from Hanford

    International Nuclear Information System (INIS)

    Gajewski, S.W.; Donaghue, J.F.

    1994-01-01

    The Hanford Site restoration is the largest waste cleanup operation in history. The Hanford plutonium production mission generated two-thirds of all the nuclear waste, by volume, in the Department of Energy (DOE) Complex. Cleanup challenges include not only large stored volumes of radioactive, hazardous, and mixed waste, but contaminated soil and groundwater and scores of major structures slated for decontamination, decommissioning, and demolition. DOE and its contractors will need to invent the technology required to do the job on a timetable driven by negotiated milestones, public concerns, and budgetary constraints. This paper will discuss the effort at Hanford to develop an integrated, streamlined strategy for compliance with the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in the conduct of research, development, and demonstration (RD ampersand D) of innovative cleanup technologies. The aspects that will be discussed include the following: the genesis of the RD ampersand D permitting challenge at Hanford; permitting options in the existing regulatory framework; regulatory options that offered the best fit for Hanford RD ampersand D activities, and the problems associated with them; and conclusions and recommendations made to regulatory bodies

  14. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    International Nuclear Information System (INIS)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O'Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah S.

    2008-01-01

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.14, 4.16, 5.20, 5.22, 5.43, and 5.45. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in February 2002. The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is one in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from Resource Conservation and Recovery Act (RCRA) borehole bore samples and composite samples

  15. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    Energy Technology Data Exchange (ETDEWEB)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O' Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah S.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Tables 4.14, 4.16, 5.20, 5.22, 5.43, and 5.45. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in February 2002. The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is one in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from Resource Conservation and Recovery Act (RCRA) borehole bore samples and composite samples.

  16. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

  17. State of the Profession: Intensive English Programs

    Science.gov (United States)

    Szasz, Patricia

    2010-01-01

    This article focuses on the current state of the ESL profession for teachers in Intensive English Programs (IEPs). Because the IEP context may be unfamiliar to some readers, the author first gives an overview of the characteristics and goals of these types of programs. Second, an examination of how administrators and programs are striving to…

  18. 20 CFR 408.1205 - How can a State have SSA administer its State recognition payment program?

    Science.gov (United States)

    2010-04-01

    ... recognition payment program? 408.1205 Section 408.1205 Employees' Benefits SOCIAL SECURITY ADMINISTRATION SPECIAL BENEFITS FOR CERTAIN WORLD WAR II VETERANS Federal Administration of State Recognition Payments § 408.1205 How can a State have SSA administer its State recognition payment program? A State (or...

  19. 1993 RCRA Part B permit renewal application, Savannah River Site: Volume 10, Consolidated Incineration Facility, Section C, Revision 1

    International Nuclear Information System (INIS)

    Molen, G.

    1993-08-01

    This section describes the chemical and physical nature of the RCRA regulated hazardous wastes to be handled, stored, and incinerated at the Consolidated Incineration Facility (CIF) at the Savannah River Site. It is in accordance with requirements of South Carolina Hazardous Waste Management Regulations R.61-79.264.13(a) and(b), and 270.14(b)(2). This application is for permit to store and teat these hazardous wastes as required for the operation of CIF. The permit is to cover the storage of hazardous waste in containers and of waste in six hazardous waste storage tanks. Treatment processes include incineration, solidification of ash, and neutralization of scrubber blowdown

  20. Annual Report RCRA Post-Closure Monitoring and Inspections for CAU 112: Area 23 Hazardous Waste Trenches, Nevada Test Site, Nevada, for the Period October 1999-October 2000

    Energy Technology Data Exchange (ETDEWEB)

    D. F. Emer

    2001-03-01

    This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the Area 23 Hazardous Waste Trenches Resource Conservation and Recovery Act (RCRA) unit, located in Area 23 of the Nevada Test Site, Nye County, Nevada, during the October 1999-October 2000 period. Inspections of the Area 23 Hazardous Waste Trenches RCRA unit are conducted to determine and document the physical condition of the covers, facilities, and any unusual conditions that could impact the proper operation of the waste unit closure. Physical inspections of the closure were completed quarterly and indicated that the site is in good condition with no significant findings noted. An annual subsidence survey of the elevation markers was conducted in August 2000. There has been no subsidence at any of the markers since monitoring began seven years ago. The objective of the neutron logging program is to monitor the soil moisture conditions along 30 neutron access tubes and detect changes that maybe indicative of moisture movement at a point located directly beneath each trench. Precipitation for the period October 1999 through October 2000 was 10.44 centimeters (cm) (4.11 inches [in.]) (U.S. National Weather Service, 2000). The prior year annual rainfall (January 1999 through December 1999) was 10.13cm (3.99 in.). The highest 30-day cumulative rainfall occurred on March 8, 2000, with a total of 6.63 cm (2.61 in.). The heaviest daily precipitation occurred on February 23,2000, with a total of 1.70 cm (0.67 in.) falling in that 24-hour period. The recorded average annual rainfall for this site, from 1972 to January 1999, is 15.06 cm (5.93 in.). All monitored access tubes are within the compliance criteria of less than 5 percent residual volumetric moisture content at the compliance point directly beneath each respective trench. Soil conditions remain dry and stable underneath the

  1. United States Geological Survey, programs in Nevada

    Science.gov (United States)

    ,

    1995-01-01

    The U.S. Geological Survey (USGS) has been collecting and interpreting natural-resources data in Nevada for more than 100 years. This long-term commitment enables planners to manage better the resources of a State noted for paradoxes. Although Nevada is one of the most sparsely populated States in the Nation, it has the fastest growing population (fig. 1). Although 90 percent of the land is rural, it is the fourth most urban State. Nevada is the most arid State and relies heavily on water resources. Historically, mining and agriculture have formed the basis of the economy; now tourism and urban development also have become important. The USGS works with more than 40 local, State, and other Federal agencies in Nevada to provide natural-resources information for immediate and long-term decisions.Subjects included in this fact sheet:Low-Level Radioactive-Waste DisposalMining and Water in the Humboldt BasinAquifer Systems in the Great BasinWater Allocation in Truckee and Carson BasinsNational Water-Quality Assessment ProgramMinerals Assessment for Land ManagementIrrigation DrainageGround-Water Movement at Nevada Test SiteOil and Gas ResourcesNational Mapping ProgramDigital Mapping and Aerial PhotographyCollection of Hydrologlc DataGeologic MappingEarthquake HazardsAssessing Mineral Resources of the SubsurfaceEarth Observation DataCooperative Programs

  2. States' experiences with loan repayment programs for health care professionals in a time of state budget cuts and NHSC expansion.

    Science.gov (United States)

    Pathman, Donald E; Morgan, Jennifer Craft; Konrad, Thomas R; Goldberg, Lynda

    2012-01-01

    The landscape of education loan repayment programs for health care professionals has been turbulent in recent years, with doubling of the funding for the National Health Service Corps (NHSC) and cuts in funding for some states' programs. We sought to understand how this turbulence is being felt within the state offices involved in recruiting clinicians to rural and urban underserved communities. We conducted key informant telephone interviews with staff of state offices of rural health, primary care organizations, and/or related organizations within 28 diverse states to answer questions about perceived changes and interplay among solely state-funded loan repayment programs, joint state-federal programs, and the NHSC federal program. Interviews were transcribed, formally analyzed, and key issues summarized. Informants reported that solely state-funded and joint state-federal loan repayment programs are greatly valued for their ability to target a state's particular needs and to complement the NHSC federal program. However, budgets for state programs have been threatened, reduced, or eliminated entirely in many cases. All informants positively perceived the NHSC's recent growth and changes, which they feel are helping fill important workforce needs for their states. Nevertheless, the much larger NHSC federal program now competes with some states' programs for clinicians and service sites; states' programs are pushed to adjust their operations to maintain a unique "niche". States' key recruiters lament reductions in funding for states' loan repayment programs, and welcome the NHSC's recent growth and changes. Better coordination is needed to minimize competition and maximize complementarity between state and federal programs. © 2012 National Rural Health Association.

  3. Disease management: findings from leading state programs.

    Science.gov (United States)

    Wheatley, Ben

    2002-12-01

    Disease management programs are designed to contain costs by improving health among the chronically ill. More than 20 states are now engaged in developing and implementing Medicaid disease management programs for their primary care case management and fee-for-service populations.

  4. HIV Services Provided by STD Programs in State and Local Health Departments - United States, 2013-2014.

    Science.gov (United States)

    Cuffe, Kendra M; Esie, Precious; Leichliter, Jami S; Gift, Thomas L

    2017-04-07

    The incidence of human immunodeficiency virus (HIV) infection in the United States is higher among persons with other sexually transmitted diseases (STDs), and the incidence of other STDs is increased among persons with HIV infection (1). Because infection with an STD increases the risk for HIV acquisition and transmission (1-4), successfully treating STDs might help reduce the spread of HIV among persons at high risk (1-4). Because health department STD programs provide services to populations who are at risk for HIV, ensuring service integration and coordination could potentially reduce the incidence of STDs and HIV. Program integration refers to the combining of STD and HIV prevention programs through structural, service, or policy-related changes such as combining funding streams, performing STD and HIV case matching, or integrating staff members (5). Some STD programs in U.S. health departments are partially or fully integrated with an HIV program (STD/HIV program), whereas other STD programs are completely separate. To assess the extent of provision of HIV services by state and local health department STD programs, CDC analyzed data from a sample of 311 local health departments and 56 state and directly funded city health departments derived from a national survey of STD programs. CDC found variation in the provision of HIV services by STD programs at the state and local levels. Overall, 73.1% of state health departments and 16.1% of local health departments matched STD case report data with HIV data to analyze possible syndemics (co-occurring epidemics that exacerbate the negative health effects of any of the diseases) and overlaps. Similarly, 94.1% of state health departments and 46.7% of local health departments performed site visits to HIV care providers to provide STD information or public health updates. One fourth of state health departments and 39.4% of local health departments provided HIV testing in nonclinical settings (field testing) for STD

  5. 76 FR 18198 - European Union-United States Atlantis Program

    Science.gov (United States)

    2011-04-01

    ... DEPARTMENT OF EDUCATION European Union-United States Atlantis Program AGENCY: Office of...)--Special Focus Competition: European Union-(EU) United States (U.S.) Atlantis Program Notice inviting... and Culture, European Commission for funding under a separate but parallel EU competition. Within this...

  6. Transire, a Program for Generating Solid-State Interface Structures

    Science.gov (United States)

    2017-09-14

    ARL-TR-8134 ● SEP 2017 US Army Research Laboratory Transire, a Program for Generating Solid-State Interface Structures by...Program for Generating Solid-State Interface Structures by Caleb M Carlin and Berend C Rinderspacher Weapons and Materials Research Directorate, ARL...

  7. 40 CFR 147.50 - State-administered program-Class II wells.

    Science.gov (United States)

    2010-07-01

    ... Carry Out Underground Injection Control Program Relating to Class II Wells as Described in Federal Safe... PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Alabama... application: (a) Incorporation by reference. The requirements set forth in the State statutes and regulations...

  8. The value of partnerships in state obesity prevention and control programs.

    Science.gov (United States)

    Hersey, James; Kelly, Bridget; Roussel, Amy; Curtis, LaShawn; Horne, Joseph; Williams-Piehota, Pamela; Kuester, Sarah; Farris, Rosanne

    2012-03-01

    State health departments funded by the Centers for Disease Control and Prevention's Nutrition, Physical Activity, and Obesity Program collaborate with multiple partners to develop and implement comprehensive obesity prevention and control programs. A mixed-methods evaluation of 28 state programs over a 5-year period assessed states' progress on program requirements, including developing statewide partnerships and coordinating with partners to support obesity prevention and control efforts. States with greater partnership involvement leveraged more funding support for their programs, passed more obesity-related policies, and were more likely to implement obesity interventions in multiple settings. Case studies provided guidance for establishing and maintaining strong partnerships. Findings from this study offer emerging evidence to support assumptions about the centrality of partnerships to states' success in obesity program development and implementation and related health promotion activities.

  9. 40 CFR 147.2500 - State-administered program.

    Science.gov (United States)

    2010-07-01

    ... State-administered program: (1) Chapter 144, Water, Sewage, Refuse, Mining and Air Pollution, Wisconsin... Section 147.2500 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS... Treatment Works, Wisconsin Administrative Code § 210.05 Natural Resources Board Order No. WQ-25-82, approved...

  10. Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann

    2010-11-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep

  11. 40 CFR 70.4 - State program submittals and transition.

    Science.gov (United States)

    2010-07-01

    ... description in narrative form of the scope, structure, coverage, and processes of the State program. (ii) A description of the organization and structure of the agency or agencies that will have responsibility for... strategies). (5) A complete description of the State's compliance tracking and enforcement program or...

  12. 75 FR 69660 - Cross-Media Electronic Reporting Rule State Authorized Program Revision Approval: State of Hawaii

    Science.gov (United States)

    2010-11-15

    ... Authorized Program Revision Approval: State of Hawaii AGENCY: Environmental Protection Agency (EPA). ACTION... Reporting, of the State of Hawaii's request to revise certain of its EPA-authorized programs to allow... meet the applicable subpart D requirements. On February 16, 2010, the State of Hawaii Department of...

  13. Low temperature setting iron phosphate ceramics as a stabilization and solidification agent for incinerator ash contaminated with transuranic and RCRA metals

    International Nuclear Information System (INIS)

    Medvedev, P.G.; Hansen, M.; Wood, E.L.; Frank, S.M.; Sidwell, R.W.; Giglio, J.J.; Johnson, S.G.; Macheret, J.

    1997-01-01

    Incineration of combustible Mixed Transuranic Waste yields an ash residue that contains oxides of Resource Conservation and Recovery Act (RCRA) and transuranic metals. In order to dispose of this ash safely, it has to be solidified and stabilized to satisfy appropriate requirements for repository disposal. This paper describes a new method for solidification of incinerator ash, using room temperature setting iron phosphate ceramics, and includes fabrication procedures for these waste forms as well as results of the MCC-1 static leach test, XRD analysis, scanning electron microscopy studies and density measurements of the solidified waste form produced

  14. Fiscal year 1994 well installation program summary report, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1994 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two monitoring wells were installed and one piezometer installation was attempted, but not completed, during the FY 1994 drilling program. In addition, SAIC provided health and safety and geotechnical oversight for two soil borings in support of the Y-12 Underground Storage Tank (UST) Program. All new monitoring wells were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific indicator parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance. All well installation was conducted following industry-standard methods and approved procedures in the Environment Surveillance Procedures Quality Control Program (Energy Systems 1988), the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1986), and Guidelines for Installation of Monitor Wells at the Y-12 Plant (Geraghty and Miller 1985). Health and safety monitoring and field screening of drilling returns and development waters were conducted in accordance with approved Martin Marietta Energy Systems, Inc. (Energy Systems) guidelines. All of the monitoring wells installed during FY 1994 at the Y-12 Plant were of screened construction

  15. Tomorrow's engineers through teacher/student programs at Penn State

    International Nuclear Information System (INIS)

    Davidson, C.

    1992-01-01

    Interest in math and science increases when the problems and topics are current and socially relevant. A course that integrates various sciences requires a solid foundation in mathematics and an understanding that real life consists of an interaction of the basic sciences. One topical area that requires the understanding of math and science and affects our society is radiation. Although nuclear issues are prevalent in the news, very few secondary science educators receive much formal training in radiation and nuclear science. A strong push for educational programs on this topic by the U.S. Atomic Energy Commission and state departments of education began in the late 1960s and early 1970s. Through this effort, Pennsylvania State University (Penn State) developed the Nuclear Concepts Institute for secondary science teachers and has continued its involvement with educational programs in nuclear science for teachers and students. From discussions with teachers and students along with formal and informal surveys, the programs have had a positive impact on teachers' interest in learning more about nuclear science and on students' choices to enter nuclear engineering or a related field. The paper discusses the Nuclear Concepts Program; formation of the American Nuclear Science Teachers Association (ANSTA); ANSTA projects; other Penn State educational programs; and impact of education programs

  16. State and local safety program

    Energy Technology Data Exchange (ETDEWEB)

    Carlyle Thompson, G D [Utah State Division of Health, Salt Lake City, UT (United States)

    1969-07-01

    This paper will give emphasis to the need for an increasing role of the states, along with the Federal agencies, in the Plowshare Program in order to assure state and local confidence with respect to the safety of their residents as the Federal government seeks new methods to benefit society. First will be stressed the age-old principle of control at the source. Other factors to be discussed are monitoring; standards and their use; control action; public relations; predictions and the need to have certain advance knowledge of tests - even if security clearance is necessary for appropriate state representatives; the state and local government responsibility to their citizens; the isolation of national decision making from state and local concern and responsibility; cost assessments and their responsibility; and research as it relates to the ecological system as well a the direct short- or long-term effects of radioactivity on man. (author)

  17. State and local safety program

    International Nuclear Information System (INIS)

    Carlyle Thompson, G.D.

    1969-01-01

    This paper will give emphasis to the need for an increasing role of the states, along with the Federal agencies, in the Plowshare Program in order to assure state and local confidence with respect to the safety of their residents as the Federal government seeks new methods to benefit society. First will be stressed the age-old principle of control at the source. Other factors to be discussed are monitoring; standards and their use; control action; public relations; predictions and the need to have certain advance knowledge of tests - even if security clearance is necessary for appropriate state representatives; the state and local government responsibility to their citizens; the isolation of national decision making from state and local concern and responsibility; cost assessments and their responsibility; and research as it relates to the ecological system as well a the direct short- or long-term effects of radioactivity on man. (author)

  18. A Monte Carlo program for generating hadronic final states

    International Nuclear Information System (INIS)

    Angelini, L.; Pellicoro, M.; Nitti, L.; Preparata, G.; Valenti, G.

    1991-01-01

    FIRST is a computer program to generate final states from high energy hadronic interactions using the Monte Carlo technique. It is based on a theoretical model in which the high degree of universality in such interactions is related with the existence of highly excited quark-antiquark bound states, called fire-strings. The program handles the decay of both fire-strings and unstable particles produced in the intermediate states. (orig.)

  19. Regulatory barriers to hazardous waste technology innovation

    International Nuclear Information System (INIS)

    Kuusinen, T.L.; Siegel, M.R.

    1991-02-01

    The primary federal regulatory programs that influence the development of new technology for hazardous waste are the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA, also commonly known as Superfund). Two important aspects of RCRA that can create barriers to hazardous waste technology innovation are technology-based waste pre-treatment standards and a cumbersome permitting program. By choosing a technology-based approach to the RCRA land disposal restrictions program, the US Environmental Protection Agency (EPA) has simultaneously created tremendous demand for the technologies specified in its regulations, while at the same time significantly reduced incentives for technology innovation that might have otherwise existed. Also, the RCRA hazardous waste permitting process can take years and cost hundreds of thousands of dollars. The natural tendency of permit writers to be cautious of unproven (i.e., innovative) technology also can create a barrier to deployment of new technologies. EPA has created several permitting innovations, however, to attempt to mitigate this latter barrier. Understanding the constraints of these permitting innovations can be important to the success of hazardous waste technology development programs. 3 refs

  20. Impacts of NRC programs on state and local governments

    International Nuclear Information System (INIS)

    Nussbaumer, D.A.; Lubenau, J.O.

    1983-12-01

    This document reports the results of an NRC staff examination of the impacts of NRC regulatory programs on State and local governments. Twenty NRC programs are identified. For each, the source of the program (e.g., statutory requirement) and NRC funding availability are described and the impacts upon State and local governments are assessed. Recommendations for NRC monitoring and assessing impacts and for enhancing NRC staff awareness of the impacts are offered

  1. State Clean Energy Policies Analysis: State, Utility, and Municipal Loan Programs

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.

    2010-05-01

    High initial costs can impede the deployment of clean energy technologies. Financing can reduce these costs. And, state, municipal, and utility-sponsored loan programs have emerged to fill the gap between clean energy technology financing needs and private sector lending. In general, public loan programs are more favorable to clean energy technologies than are those offered by traditional lending institutions; however, public loan programs address only the high up-front costs of clean energy systems, and the technology installed under these loan programs rarely supports clean energy production at levels that have a notable impact on the broader energy sector. This report discusses ways to increase the impact of these loan programs and suggests related policy design considerations.

  2. Financing state newborn screening programs: sources and uses of funds.

    Science.gov (United States)

    Johnson, Kay; Lloyd-Puryear, Michele A; Mann, Marie Y; Ramos, Lauren Raskin; Therrell, Bradford L

    2006-05-01

    Financing for newborn screening is different from virtually all other public health programs. All except 5 screening programs collect fees as the primary source of program funding. A fee-based approach to financing newborn screening has been adopted by most states, to ensure consistent funding for this critical public health activity. Two types of data are reported here, ie, primary data from a survey of 37 state public health agencies and findings from exploratory case studies from 7 states. Most of the programs that participated in this survey (73%) reported that their newborn screening funding increased between 2002 and 2005, typically through increased fees and to a lesser extent through Medicaid, Title V Maternal and Child Health Services Block Grant, and state general revenue funding. All of the responding states that collect fees (n = 31) use such funds to support laboratory expenses, and most (70%) finance short-term follow-up services and program management. Nearly one half (47%) finance longer-term follow-up services, case management, or family support beyond diagnosis. Other states (43%) finance genetic or nutritional counseling and formula foods or treatment. Regardless of the source of funds, the available evidence indicates that states are committed to maintaining their programs and securing the necessary financing for the initial screening through diagnosis. Use of federal funding is currently limited; however, pressure to provide dedicated federal funding would likely increase if national recommendations for a uniform newborn screening panel were issued.

  3. State Level Review of Doctoral Programs in Texas.

    Science.gov (United States)

    Whittington, Nil

    Review of doctoral degree programs in Texas public colleges and universities is discussed. Attention is directed to review procedures and strengths and weaknesses in the state's doctoral programs in educational psychology, counseling and guidance, and student personnel services. Doctoral programs were reviewed because of their high cost and a…

  4. State property tax programs promoting sustainable forests in the United States: A review of program structure and administration

    Science.gov (United States)

    Michael Kilgore; Paul Ellefson; Travis Funk; Gregory E. Frey

    2018-01-01

    Financial incentives offered by state property tax programs are a means of promoting goods and services from private forestland. Identified by a 50-state review in 2014–2015, these incentives often require adherence to several conditions including valid ownership and use of forestland, correct size of parcel and suitable forest...

  5. Hazardous materials management and control program at Oak Ridge National Laboratory - environmental protection

    International Nuclear Information System (INIS)

    Eisenhower, B.M.; Oakes, T.W.

    1982-01-01

    In the Federal Register of May 19, 1980, the US Environmental Protection Agency promulgated final hazardous waste regulations according to the Resource Conservation and Recovery Act (RCRA) of 1976. The major substantive portions of these regulations went into effect on November 19, 1980, and established a federal program to provide comprehensive regulation of hazardous waste from its generation to its disposal. In an effort to comply with these regulations, a Hazardous Materials Management and Control Program was established at Oak Ridge National Laboratory. The program is administered by two Hazardous Materials Coordinators, who together with various support groups, ensure that all hazardous materials and wastes are handled in such a manner that all personnel, the general public, and the environment are adequately protected

  6. A Linear Programming Model to Optimize Various Objective Functions of a Foundation Type State Support Program.

    Science.gov (United States)

    Matzke, Orville R.

    The purpose of this study was to formulate a linear programming model to simulate a foundation type support program and to apply this model to a state support program for the public elementary and secondary school districts in the State of Iowa. The model was successful in producing optimal solutions to five objective functions proposed for…

  7. The History of the Rhodes State College Dental Hygiene Program

    Science.gov (United States)

    Bowers, Denise E.

    2012-01-01

    The historiography of the Rhodes State College Dental Hygiene Program (Program) presents a historical journey of health care, as it relates to oral health, in the United States, in Ohio, and in Lima. This study bridges the gap between the history of higher education and the history of an academic program, dental hygiene. Prior to this study, there…

  8. Regulated Disposal of NORM/TENORM Waste in Colorado: The Deer Trail Landfill

    International Nuclear Information System (INIS)

    Kennedy, W.E. Jr.; Retallick, P.G.; Kehoe, J.H.; Webb, M.M.; Nielsen, D.B.; Spaanstra, J.R.; Kornfeld, L.M.

    2006-01-01

    On January 31, 2005, Clean Harbors Environmental Services submitted a license application to the Colorado Department of Public Health and Environment (CDPHE) for the disposal of naturally occurring radioactive material (NORM) and technologically enhanced radioactive material (TENORM) at Clean Harbor's Deer Trail RCRA Subtitle C landfill. Deer Trail is located 70 miles east of Denver, Colorado. The license application for Deer Trail was submitted under CCR 1007-1, Part 14 [1] the Colorado State equivalent of 10 CFR Part 61 [2] for radioactive waste disposal. A disposal license is required since some of the NORM/TENORM waste in Colorado is licensed by CDPHE. The license application does not extend to byproduct or source material, and thus does not include the broader categories found in Class A radioactive waste. The license application requires the establishment of a radiation protection program, assuring that all NORM/TENORM waste, even non-licensed waste disposed under RCRA, will have appropriate radiological controls for workers, the public, and the environment. Because Deer Trail is a RCRA Subtitle C facility with an active RCRA Permit and because of the overlapping and similar requirements in the process to obtain either a RCRA permit or a radioactive waste disposal license, the license process for Deer Trail was appropriately focused. This focusing was accomplished by working with the Colorado Department of Public Health and Environment (CDPHE) and excluding or waiving selected radioactive materials license requirements from further consideration because they were found to be adequately addressed under the RCRA Permit. Of most significance, these requirements included: - Institutional Information - Federal or State ownership will not be required, since the State's Radiation Control regulations allow for private site ownership, consistent with the same financial assurance and institutional control requirements of RCRA. - Development of Additional Technical

  9. The Los Alamos National Laboratory Environmental Restoration Program

    International Nuclear Information System (INIS)

    Krueger, J.W.

    1990-01-01

    The LANL Environmental Restoration (ER) Program Office, established in October 1989, is faced with the challenge of assessing and cleaning up nearly 1,8000 potentially hazardous waste sites according to an aggressive corrective action schedule that the Environmental Protection Agency (EPA) mandated on May 23, 1990, in a Resource, Conservation, and Recovery Act (RCRA) Part B Permit. To maximize program efficiency, the ER Program Office will implement a unique management approach designed to maximize the use of laboratory technical expertise. The Installation Work Plan, which provides a blueprint for the program, has been submitted to EPA for review and approval. A work plan for characterization of Technical Area 21, an early plutonium processing facility, is also nearing completion. The feasibility of an expedited cleanup of the Laboratory's worst hazardous waste release has been modelled using a computer code originally developed by LANL to assist the nuclear weapons testing program. A sophisticated Geographic Information System has been implemented to assist in data management and presentation, and the design of a Mixed Waste Disposal Facility is underway. 6 refs., 2 figs

  10. 77 FR 33456 - Public Water Supply Supervision Program; Program Revision for the State of Washington

    Science.gov (United States)

    2012-06-06

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9682-4] Public Water Supply Supervision Program; Program... State Public Water Supply Supervision Primacy Program. Washington has adopted regulations analogous to... of Health--Office of Drinking Water, [[Page 33457

  11. Programs for Strengthening Families of State Prison Staff

    Science.gov (United States)

    Tripp, Paula J.

    2010-01-01

    This article describes "Training for Strong Families," a family strengthening program for officers working in the state prison system. The program was offered once per week on the same day and at the same time, and the sessions lasted 15-20 minutes. The new program included topics such as Budgeting 101, Relationships, and Stress Management.…

  12. Analytical approaches used in stream benthic macroinvertebrate biomonitoring programs of State agencies in the United States

    Science.gov (United States)

    Carter, James L.; Resh, Vincent H.

    2013-01-01

    Biomonitoring programs based on benthic macroinvertebrates are well-established worldwide. Their value, however, depends on the appropriateness of the analytical techniques used. All United States State, benthic macroinvertebrate biomonitoring programs were surveyed regarding the purposes of their programs, quality-assurance and quality-control procedures used, habitat and water-chemistry data collected, treatment of macroinvertebrate data prior to analysis, statistical methods used, and data-storage considerations. State regulatory mandates (59 percent of programs), biotic index development (17 percent), and Federal requirements (15 percent) were the most frequently reported purposes of State programs, with the specific tasks of satisfying the requirements for 305b/303d reports (89 percent), establishment and monitoring of total maximum daily loads, and developing biocriteria being the purposes most often mentioned. Most states establish reference sites (81 percent), but classify them using State-specific methods. The most often used technique for determining the appropriateness of a reference site was Best Professional Judgment (86 percent of these states). Macroinvertebrate samples are almost always collected by using a D-frame net, and duplicate samples are collected from approximately 10 percent of sites for quality assurance and quality control purposes. Most programs have macroinvertebrate samples processed by contractors (53 percent) and have identifications confirmed by a second taxonomist (85 percent). All States collect habitat data, with most using the Rapid Bioassessment Protocol visual-assessment approach, which requires ~1 h/site. Dissolved oxygen, pH, and conductivity are measured in more than 90 percent of programs. Wide variation exists in which taxa are excluded from analyses and the level of taxonomic resolution used. Species traits, such as functional feeding groups, are commonly used (96 percent), as are tolerance values for organic pollution

  13. Strategic planning of an integrated program for state oversight agreements

    International Nuclear Information System (INIS)

    Walzer, A.E.; Cothron, T.K.

    1991-01-01

    Among the barrage of agreements faced by federal facilities are the State Oversight Agreements (known as Agreements in Principle in many states). These agreements between the Department of Energy (DOE) and the states fund the states to conduct independent environmental monitoring and oversight which requires plans, studies, inventories, models, and reports from DOE and its management and operating contractors. Many states have signed such agreements, including Tennessee, Kentucky, Washington, Idaho, Colorado, California, and Florida. This type of oversight agreement originated in Colorado as a result of environmental concerns at the Rocky Flats Plant. The 5-year State Oversight Agreements for Tennessee and Kentucky became effective on May 13, 1991, and fund these states nearly $21 million and $7 million, respectively. Implementation of these open-quotes comprehensive and integratedclose quotes agreements is particularly complex in Tennessee where the DOE Oak Ridge Reservation houses three installations with distinctly different missions. The program development and strategic planning required for coordinating and integrating a program of this magnitude is discussed. Included are the organizational structure and interfaces required to define and coordinate program elements across plants and to also effectively negotiate scope and schedules with the state. The planned Program Management Plan, which will contain implementation and procedural guidelines, and the management control system for detailed tracking of activities and costs are outlined. Additionally, issues inherent in the nature of the agreements and implementation of a program of this magnitude are discussed. Finally, a comparison of the agreements for Tennessee, Kentucky, Colorado, and Idaho is made to gain a better understanding of the similarities and differences in State Oversight Agreements to aid in implementation of these agreements

  14. Impacts of proposed RCRA regulations and other related federal environmental regulations on fossil fuel-fired facilities: Final report, Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    Estimation of the costs associated with implementation of the Resource Conservation and Recovery Act (RCRA) regulations for non-hazardous and hazardous material disposal in the utility industry are provided. These costs are based on engineering studies at a number of coal-fired power plants in which the costs for hazardous and non-hazardous disposal are compared to the costs developed for the current practice design for each utility. The relationship of the three costs is displayed. The emphasis of this study is on the determination of incremental costs rather than the absolute costs for each case (current practice, non-hazardous, or hazardous). For the purpose of this project, the hazardous design cost was determined for minimum versus maximum compliance.

  15. Findings from case studies of state and local immunization programs.

    Science.gov (United States)

    Fairbrother, G; Kuttner, H; Miller, W; Hogan, R; McPhillips, H; Johnson, K A; Alexander, E R

    2000-10-01

    As part of its examination of federal support for immunization services during the past decade, the Institute of Medicine (IOM) Committee on Immunization Finance Policies and Practices (IFPP) commissioned eight case studies of the states of Alabama, Maine, Michigan, New Jersey, North Carolina, Texas, and Washington; and a two-county study of Los Angeles and San Diego in California. Specifically, the IOM Committee and these studies reviewed the use of Section 317 grants by the states. Section 317 is a discretionary grant program that supports vaccine purchase and other immunization-related program activities. These studies afforded the Committee an in-depth look at local policy choices, the performance of immunization programs, and federal and state spending for immunization during the past decade. The case-study reports were developed through interviews with state and local health department officials, including immunization program directors, Medicaid agency staff, budget analysts, and Centers for Disease Control and Prevention public health advisors to the jurisdiction. Other sources included state and federal administrative records and secondary sources on background factors and state-level trends. The case studies were supplemented by site visits to Detroit, Houston, Los Angeles, Newark, and San Diego. The nature of immunization "infrastructure" supported by the Section 317 program is shifting from primarily service delivery to a broader set of roles that puts the public effort at the head of a broad immunization partnership among public health, health financing, and other entities in both the public and private sectors. The rate and intensity of transition vary across the case-study areas. In the emerging pattern, service delivery increasingly takes place in the private sector and is related to managed care. "Infrastructure" is moving beyond supporting a core state staff and local health department service delivery to include such activities as immunization

  16. Facility status and progress of the INEL's WERF MLLW and LLW incinerator

    International Nuclear Information System (INIS)

    Conley, D.; Corrigan, S.

    1996-01-01

    The Idaho National Engineering Laboratory's (INEL) Waste Experimental Reduction Facility (WERF) incinerator began processing beta/gamma- emitting low-level waste (LLW) in September 1984. A Resource Conservation and Recovery Act (RCRA) trial burn for the WERF incinerator was conducted in 1986, and in 1989 WERF began processing (hazardous and low-level radioactive) waste known as mixed low-level waste (MLLW). On February 14, 1991 WERF operations were suspended to improve operating procedures and configuration management. On July 12, 1995, WERF initiated incineration of LLW; and on September 20, 1995 WERF resumed its primary mission of incinerating MLLW. MLLW incineration is proceeding under RCRA interim status. State of Idaho issuance of the Part B permit is one of the State's highest permitting priorities. The State of Idaho's Division of Environmental Quality is reviewing the permit application along with a revised trial burn plan that was also submitted with the application. The trial burn has been proposed to be performed in 1996 to demonstrate compliance with the current incinerator guidance. This paper describes the experiences and problems associated with WERF's operations, incineration of MLLW, and the RCRA Part B Permit Application. Some of the challenges that have been overcome include waste characterization, waste repackaging, repackaged waste storage, and implementation of RCRA interim status requirements. A number of challenges remain. They include revision of the RCRA Part B Permit Application and the Trial Burn Plan in response to comments from the state permit application reviewers as well as facility and equipment upgrades required to meet RCRA Permitted Status

  17. 75 FR 41239 - Notice of Lodging of Consent Decree; Pursuant to the Resource Conservation and Recovery Act (“RCRA”)

    Science.gov (United States)

    2010-07-15

    ... compliance procedures, a RCRA-specific employee training program, and undertaking a comprehensive third-party... be addressed to the Assistant Attorney General, Environment and Natural Resources Division, and... public meeting in the affected area, in accordance with section 7003(d) of RCRA, 42 U.S.C. 6973(d). The...

  18. 200 West Groundwater Aggregate Area management study report

    International Nuclear Information System (INIS)

    1993-01-01

    This report presents the results of an aggregate area management study (AAMS) for the 200 West Groundwater Aggregate Area in the 200 Areas of the US Department of Energy (DOE) Hanford Site in Washington State. This scoping level study provides the basis for initiating Remedial Investigation/Feasibility Study (RI/FS) activities under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) or Resource Conservation and Recovery Act (RCRA), Facility Investigations (Rlq) and Corrective Measures Studies (CMS) under RCRA. This report also integrates select RCRA treatment, storage or disposal (TSD) closure activities with CERCLA and RCRA past practice investigations

  19. 200 North Aggregate Area source AAMS report

    International Nuclear Information System (INIS)

    1993-06-01

    This report presents the results of an aggregate area management study (AAMS) for the 200 North Aggregate Area in the 200 Areas of the US Department of Energy (DOE) Hanford Site in Washington State. This scoping level study provides the basis for initiating Remedial Investigation/Feasibility Study (RI/FS) activities under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) or Resource Conservation and Recovery Act (RCRA) Facility Investigations (RFI) and Corrective Measures Studies (CMS) under RCRA. This report also integrates select RCRA treatment, storage, or disposal (TSD) closure activities with CERCLA and RCRA past practice investigations

  20. PUREX source Aggregate Area management study report

    International Nuclear Information System (INIS)

    1993-03-01

    This report presents the results of an aggregate area management study (AAMS) for the PUREX Plant Aggregate Area in the 200 Areas of the US Department of Energy (DOE)Hanford Site in Washington State. This scoping level study provides the basis for initiating Remedial Investigation/Feasibility Study (RI/FS) activities under the comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) or Resource Conservation and Recovery Act (RCRA) Facility Investigations (RFI) and Corrective Measures Studies (CMS) under RCRA. This report also integrates select RCRA treatment, storage, or disposal (TSD) closure activities with CERCLA and RCRA past-practice investigations

  1. 200 North Aggregate Area source AAMS report

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This report presents the results of an aggregate area management study (AAMS) for the 200 North Aggregate Area in the 200 Areas of the US Department of Energy (DOE) Hanford Site in Washington State. This scoping level study provides the basis for initiating Remedial Investigation/Feasibility Study (RI/FS) activities under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) or Resource Conservation and Recovery Act (RCRA) Facility Investigations (RFI) and Corrective Measures Studies (CMS) under RCRA. This report also integrates select RCRA treatment, storage, or disposal (TSD) closure activities with CERCLA and RCRA past practice investigations.

  2. Closure of hazardous and mixed radioactive waste management units at DOE facilities

    International Nuclear Information System (INIS)

    1990-06-01

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure of each of the following hazardous waste management units regulated under RCRA

  3. 40 CFR 172.25 - Administration of State programs.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Administration of State programs. 172.25 Section 172.25 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE... upon the nature of the pest problem and the requirements of the testing program submitted. The...

  4. State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, January-July 1981

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C.; Toth, W.J. (comps.)

    1982-05-01

    The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. For each state (Colorado, Montana, New Mexico, North and South Dakota, Utah, and Wyoming), prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are also covered, and findings and recommendations are given for each state. Some background information about the program is provided. (LEW)

  5. The United States foreign research reactor spent nuclear fuel acceptance program: Proposal to modify the program

    International Nuclear Information System (INIS)

    Messick, C.E.

    2005-01-01

    The United States Department of Energy (DOE), in consultation with the Department of State (DOS), adopted the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel in May 1996. The policy was slated to expire in May 2009. However, in October 2003, a petition requesting a program extension was delivered to the United States Secretary of Energy from a group of research reactor operators from foreign countries. In April 2004, the Secretary directed DOE undertake an analysis, as required by the National Environmental Policy Act (NEPA), to consider potential extension of the Program. On December 1, 2004, a Federal Register Notice was issued approving the program extension. This paper discusses the findings from the NEPA analysis and the potential changes in the program that may result from implementation of the proposed changes. (author)

  6. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  7. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  8. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  9. Program, policy, and price interventions for tobacco control: quantifying the return on investment of a state tobacco control program.

    Science.gov (United States)

    Dilley, Julia A; Harris, Jeffrey R; Boysun, Michael J; Reid, Terry R

    2012-02-01

    We examined health effects associated with 3 tobacco control interventions in Washington State: a comprehensive state program, a state policy banning smoking in public places, and price increases. We used linear regression models to predict changes in smoking prevalence and specific tobacco-related health conditions associated with the interventions. We estimated dollars saved over 10 years (2000-2009) by the value of hospitalizations prevented, discounting for national trends. Smoking declines in the state exceeded declines in the nation. Of the interventions, the state program had the most consistent and largest effect on trends for heart disease, cerebrovascular disease, respiratory disease, and cancer. Over 10 years, implementation of the program was associated with prevention of nearly 36,000 hospitalizations, at a value of about $1.5 billion. The return on investment for the state program was more than $5 to $1. The combined program, policy, and price interventions resulted in reductions in smoking and related health effects, while saving money. Public health and other leaders should continue to invest in tobacco control, including comprehensive programs.

  10. 76 FR 366 - Public Water Supply Supervision Program; Program Revision for the State of Washington

    Science.gov (United States)

    2011-01-04

    ... ENVIRONMENTAL PROTECTION AGENCY [FRL-9247-4] Public Water Supply Supervision Program; Program... State Public Water Supply Supervision Primacy Program. Washington has adopted a definition for public water system that is analogous to EPA's definition of public water system, and has adopted regulations...

  11. Hanford Permanent Isolation Barrier Program: Asphalt technology data and status report - FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Freeman, H.D.; Romine, R.A.; Zacher, A.H.

    1994-09-01

    The asphalt layer within the Hanford Permanent Isolation Barrier (HPIB) is an important component of the overall design. This layer provides a RCRA equivalent backup to the overlying earthen layers in the unlikely event that these layers are not able to reduce the infiltration rate to less than 0.05 cm/yr. There is only limited amount of information on using asphalt for a moisture infiltration barrier over the long times required by the HPIB. Therefore, a number of activities are under way, as part of the Barrier Development Program, to obtain data on the performance of asphalt as a moisture barrier in a buried environment over a 1000-year period. These activities include (1) determining RCRA equivalency, (2) measurement of physical properties, (3) measurement of aging characteristics, and (4) relationship to ancient asphalt analogs. During FY 1994 progress was made on all of these activities. Studies were conducted both in the laboratory and on the prototype barrier constructed over the 216-B-57 crib in the 200 East Area on the Hanford Site. This report presents results obtained from the asphalt technology tasks during FY 1994. Also included are updates to planned activities for asphalt analogs and monitoring the asphalt test pad near the prototype barrier. Measurements of hydraulic conductivity on the HMAC portion of the prototype barrier show that the asphalt layers easily meet the RCRA standard of 1 {times} 10{sup -7} cm/s. In-place measurements using a new field falling head technique show an average of 3.66 {times} 10{sup -8} cm/s, while cores taken from the north end of the prototype and measured in a laboratory setup averaged 1.29 {times} 10{sup -9} cm/s. Measurements made on the fluid applied asphalt membrane (polymer-modified asphalt) show an extremely low permeability of less than 1 {times} 10{sup -11} cm/s.

  12. Hanford Permanent Isolation Barrier Program: Asphalt technology data and status report - FY 1994

    International Nuclear Information System (INIS)

    Freeman, H.D.; Romine, R.A.; Zacher, A.H.

    1994-09-01

    The asphalt layer within the Hanford Permanent Isolation Barrier (HPIB) is an important component of the overall design. This layer provides a RCRA equivalent backup to the overlying earthen layers in the unlikely event that these layers are not able to reduce the infiltration rate to less than 0.05 cm/yr. There is only limited amount of information on using asphalt for a moisture infiltration barrier over the long times required by the HPIB. Therefore, a number of activities are under way, as part of the Barrier Development Program, to obtain data on the performance of asphalt as a moisture barrier in a buried environment over a 1000-year period. These activities include (1) determining RCRA equivalency, (2) measurement of physical properties, (3) measurement of aging characteristics, and (4) relationship to ancient asphalt analogs. During FY 1994 progress was made on all of these activities. Studies were conducted both in the laboratory and on the prototype barrier constructed over the 216-B-57 crib in the 200 East Area on the Hanford Site. This report presents results obtained from the asphalt technology tasks during FY 1994. Also included are updates to planned activities for asphalt analogs and monitoring the asphalt test pad near the prototype barrier. Measurements of hydraulic conductivity on the HMAC portion of the prototype barrier show that the asphalt layers easily meet the RCRA standard of 1 x 10 -7 cm/s. In-place measurements using a new field falling head technique show an average of 3.66 x 10 -8 cm/s, while cores taken from the north end of the prototype and measured in a laboratory setup averaged 1.29 x 10 -9 cm/s. Measurements made on the fluid applied asphalt membrane (polymer-modified asphalt) show an extremely low permeability of less than 1 x 10 -11 cm/s

  13. Final report on the waste area grouping perimeter groundwater quality monitoring well installation program at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Greene, J.A.

    1991-06-01

    A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included

  14. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Science.gov (United States)

    2010-01-07

    ...The Environmental Protection Agency (EPA or the Agency) is announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) Sites. EPA's Office of Solid Waste and Emergency and Emergency Response (OSWER) has developed the draft recommended interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer- reviewed toxicity values and current EPA equations and default exposure assumptions. This Federal Register notice is intended to provide an opportunity for public comment on the draft recommended interim PRGs. EPA will consider any public comments submitted in accordance with this notice and may revise the draft recommended interim PRGs thereafter.

  15. Financial responsibilities under RCRA. Hearing before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session on H. R. 3692, November 13, 1985

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Representatives of environmental organizations, the Hazardous Waste Treatment Council, and regulators were among those testifying at a hearing on H.R. 3692, which amends the Resource Conservation and Recovery Act (RCRA) of 1976. The bill is in response to concerns that the Environmental Protection Agency (EPA) has not compiled with the intent of RCRA in its failure to move beyond interim permits to issue final permits to land disposal facilities accepting hazardous wastes. Reported leakage and environmental risks from sites operating under interim permits raises questions about how disposal companies could deal with liability claims. At issue was whether Congress needs to take new action to develop regulations under which financially responsible companies can operate or whether new EPA rules can solve the problem. A spokesman for EPA reviewed the liability insurance problem and the status of the insurance market in this context. Material submitted for the record follows the text of H.R. 3692 and the testimony of 11 witnesses.

  16. Harwell's atomic, molecular and solid state computer programs

    International Nuclear Information System (INIS)

    Harker, A.H.

    1976-02-01

    This document is intended to introduce the computational facilities available in the fields of atomic, molecular the solid state theory on the IBM370/165 at Harwell. The programs have all been implemented and thoroughly tested by the Theory of Solid State Materials Group. (author)

  17. Improvement program of state supervision system for radioactive and nuclear installations

    International Nuclear Information System (INIS)

    Cardenas, J.

    1993-01-01

    The current program begins as part of a policy to take care of the development of the cuban nuclear program and with the objective of improving the state supervision system of nuclear and radioactive facilities on the basis of the national experience, good skills internationally accepted and taking into account IAEA recommendations. The program develops the following topics: reorientation and restructure of state supervision, review of the current nuclear legislature, update of regulations of facility safety and qualification and training of state supervision personnel

  18. 77 FR 29275 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2012-05-17

    ...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The... State regulations that are authorized and that the EPA will enforce under the Solid Waste Disposal Act...

  19. 77 FR 46994 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2012-08-07

    ...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The... State regulations that are authorized and that the EPA will enforce under the Solid Waste Disposal Act...

  20. 75 FR 36609 - Oklahoma: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-06-28

    ...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... ``Approved State Hazardous Waste Management Programs'', Oklahoma's authorized hazardous waste program. The... State regulations that are authorized and that the EPA will enforce under the Solid Waste Disposal Act...

  1. A successful environmental remediation program closure and post-closure activities (CAPCA) Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Bowers, M.H.

    1991-01-01

    The Resource Conservation and Recovery Act (RCRA) closure of eleven waste management units at the Department of Energy's (DOE's) Oak Ridge Y-12 Plant is nearing completion. The Oak Ridge Y-12 Plant is managed by Martin Marietta Energy Systems, Inc. for the US Department of Energy under Contract DE-AC05-84OR21400. The Closure and Post Closure Program (CAPCA) has been accomplished on an accelerated schedule through the efforts of a dedicated team from several organizations. This paper relates experience gained from the program that can be of benefit on other DOE environmental remediation projects. Technical design and construction aspects, as well as project management considerations, are discussed

  2. 75 FR 76731 - Request for Comment for Report on In-State Broadcast Programming

    Science.gov (United States)

    2010-12-09

    ... Report on In-State Broadcast Programming AGENCY: Federal Communications Commission. ACTION: Notice... to submit a report on in- state broadcast programming to the appropriate Congressional committees no.... REPORT ON IN-STATE BROADCAST PROGRAMMING. Not later than 18 months after the date of the enactment of...

  3. 77 FR 59879 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-10-01

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA... Federal Register, the EPA is codifying and incorporating by reference the State's hazardous waste program...

  4. 30 CFR 902.10 - State regulatory program approval.

    Science.gov (United States)

    2010-07-01

    ... Mining and Water Management, 3601 C Street, Suite 800, Anchorage, AK 99503-5925, Telephone: (907) 762... Section 902.10 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE ALASKA § 902.10 State...

  5. 75 FR 45489 - New York: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-08-03

    ...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. EPA uses the regulations entitled ``Approved State Hazardous Waste Management Programs'' to...

  6. RCRA Facility Investigation/Remedial Investigation Report for Gunsite 720 Rubble Pit Unit (631-16G) - March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1996-03-01

    Gunsite 720 Rubble Pit Unit is located on the west side of SRS. In the early to mid 1980`s, while work was being performed in this area, nine empty, partially buried drums, labeled `du Pont Freon 11`, were found. As a result, Gunsite 720 became one of the original waste units specified in the SRS RCRA Facility Assessment (RFA). The drums were excavated on July 30, 1987 and placed on a pallet at the unit. Both the drums and pallet were removed and disposed of in October 1989. The area around the drums was screened during the excavation and the liquid (rainwater) that collected in the excavated drums was sampled prior to disposal. No evidence of hazardous materials was found. Based on the review of the analytical data and screening techniques used to evaluate all the chemicals of potential concern at Gunsite 720 Rubble Pit Unit, it is recommended that no further remedial action be performed at this unit.

  7. RCRA Facility Investigation/Remedial Investigation Report for Gunsite 720 Rubble Pit Unit (631-16G) - March 1996

    International Nuclear Information System (INIS)

    Palmer, E.

    1996-03-01

    Gunsite 720 Rubble Pit Unit is located on the west side of SRS. In the early to mid 1980's, while work was being performed in this area, nine empty, partially buried drums, labeled 'du Pont Freon 11', were found. As a result, Gunsite 720 became one of the original waste units specified in the SRS RCRA Facility Assessment (RFA). The drums were excavated on July 30, 1987 and placed on a pallet at the unit. Both the drums and pallet were removed and disposed of in October 1989. The area around the drums was screened during the excavation and the liquid (rainwater) that collected in the excavated drums was sampled prior to disposal. No evidence of hazardous materials was found. Based on the review of the analytical data and screening techniques used to evaluate all the chemicals of potential concern at Gunsite 720 Rubble Pit Unit, it is recommended that no further remedial action be performed at this unit

  8. Results of the groundwater quality assessment program at the 216-A-29 ditch RCRA facility

    International Nuclear Information System (INIS)

    Votava, J.M.

    1995-01-01

    This report presents the findings of the groundwater quality assessment program for the 216-A-29 Ditch. The information presented in this report Ditch have affected the quality of the groundwater in the unconfined aquifer beneath the facility. The results indicate that the 216-A-29 Ditch is the source of elevated specific conductance in well 299-E25-35 and that the source is nonhazardous. This report describes the current monitoring status of the 216-A-29 Ditch, groundwater chemical data interpretation, and recommends the reinstatement of an indicator-evaluation monitoring program in accordance with 40 CFR 265.93(d)(6)

  9. Ethics Education in Midwifery Education Programs in the United States.

    Science.gov (United States)

    Megregian, Michele

    2016-09-01

    Familiarity with ethical concepts is a required competency for new graduates and a component of accreditation for midwifery education programs in the United States. While midwifery educators have acknowledged the importance of ethics education in midwifery programs, little is known about current methods, format, or evaluation of ethics education. A Web-based survey was developed for program directors of accredited midwifery education programs in the United States. Clock hours, formats, venues, content topics, barriers, and evaluation methods were evaluated by descriptive analysis. Fifty-one percent of programs completed the online survey (25/49). Of these, only 7 (28%) offer ethics as a stand-alone class, although all responding programs integrate some ethics education into other core classes. Programs show variation in format, venue, resources, and clock hours dedicated to ethics education. The most frequent barrier to ethics education is an already crowded curriculum (60%), although 32% of programs denied any barriers at all. The majority of programs include the ethical concepts of informed consent, shared decision making, and effective communication in curriculum content. This survey found that there is considerable variation in ethics education in terms of content, format, and evaluation among accredited midwifery education programs in the United States. Midwifery educators have an opportunity to explore the ethical dilemmas unique to maternity care from a midwifery perspective. There is also the opportunity to create a comprehensive and dynamic midwifery ethics curriculum, which incorporates both stand-alone ethics courses and ethics concepts that are woven throughout the core midwifery curriculum. © 2016 by the American College of Nurse-Midwives.

  10. Coordination of groundwater activities in the 100 N Area

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1995-09-01

    The initiation of the N Springs Expedited Response Action (ERA) in the 100 N Area will affect the groundwater monitoring networks of two Resource Conservation and Recovery Act of 1976 (RCRA) units. The 1301-N and 325-N facilities are treatment, storage, or disposal (TSD) units that have been monitored under RCRA since 1987. In September 1994, the Washington State Department of Ecology issued an action memorandum, instructing the US Department of Energy (DOE) to take the action. The planned pump-and-treat system will preclude meeting the specific objectives of interim-status RCRA groundwater monitoring representative samples and detect adverse impacts of the TSD units on. However, under RCRA final-status requirements, which will be implemented in 1999, corrective action for groundwater contamination will probably be required. The US Environmental Protection Agency (EPA) has declared parity between RCRA corrective action and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 remedial action decisions. The 1301-N and 1325-N facilities are still in interim-status and therefore are not in the category of ''RCRA corrective action.'' However, DOE's position is that parity exists between RCRA and the ERA because RCRA corrective action will almost certainly be required in the future

  11. Overview of hazardous-waste regulation at federal facilities

    International Nuclear Information System (INIS)

    Tanzman, E.; LaBrie, B.; Lerner, K.

    1982-05-01

    This report is organized in a fashion that is intended to explain the legal duties imposed on officials responsible for hazardous waste at each stage of its existence. Section 2 describes federal hazardous waste laws, explaining the legal meaning of hazardous waste and the protective measures that are required to be taken by its generators, transporters, and storers. In addition, penalties for violation of the standards are summarized, and a special discussion is presented of so-called imminent hazard provisions for handling hazardous waste that immediately threatens public health and safety. Although the focus of Sec. 2 is on RCRA, which is the principal federal law regulating hazardous waste, other federal statutes are discussed as appropriate. Section 3 covers state regulation of hazardous waste. First, Sec. 3 explains the system of state enforcement of the federal RCRA requirements on hazardous waste within their borders. Second, Sec. 3 discusses two peculiar provisions of RCRA that appear to permit states to regulate federal facilities more strictly than RCRA otherwise would require

  12. Overview of hazardous-waste regulation at federal facilities

    Energy Technology Data Exchange (ETDEWEB)

    Tanzman, E.; LaBrie, B.; Lerner, K.

    1982-05-01

    This report is organized in a fashion that is intended to explain the legal duties imposed on officials responsible for hazardous waste at each stage of its existence. Section 2 describes federal hazardous waste laws, explaining the legal meaning of hazardous waste and the protective measures that are required to be taken by its generators, transporters, and storers. In addition, penalties for violation of the standards are summarized, and a special discussion is presented of so-called imminent hazard provisions for handling hazardous waste that immediately threatens public health and safety. Although the focus of Sec. 2 is on RCRA, which is the principal federal law regulating hazardous waste, other federal statutes are discussed as appropriate. Section 3 covers state regulation of hazardous waste. First, Sec. 3 explains the system of state enforcement of the federal RCRA requirements on hazardous waste within their borders. Second, Sec. 3 discusses two peculiar provisions of RCRA that appear to permit states to regulate federal facilities more strictly than RCRA otherwise would require.

  13. ASTDD Synopses of State Oral Health Programs - Selected indicators

    Data.gov (United States)

    U.S. Department of Health & Human Services — 2011-2017. The ASTDD Synopses of State Oral Health Programs contain information useful in tracking states’ efforts to improve oral health and contributions to...

  14. 77 FR 14509 - State Energy Program and Energy Efficiency and Conservation Block Grant (EECBG) Program; Request...

    Science.gov (United States)

    2012-03-12

    ... DEPARTMENT OF ENERGY [Docket No. EESEP0216] State Energy Program and Energy Efficiency and Conservation Block Grant (EECBG) Program; Request for Information AGENCY: Office of Energy Efficiency and... (SEP) and Energy Efficiency and Conservation Block Grant (EECBG) program, in support of energy...

  15. 34 CFR 461.1 - What is the Adult Education State-administered Basic Grant Program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What is the Adult Education State-administered Basic...-ADMINISTERED BASIC GRANT PROGRAM General § 461.1 What is the Adult Education State-administered Basic Grant Program? The Adult Education State-administered basic Grant Program (the program) is a cooperative effort...

  16. 40 CFR 147.52 - State-administered program-Hydraulic Fracturing of Coal Beds.

    Science.gov (United States)

    2010-07-01

    ... Fracturing of Coal Beds. 147.52 Section 147.52 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... PROGRAMS Alabama § 147.52 State-administered program—Hydraulic Fracturing of Coal Beds. The UIC program for hydraulic fracturing of coal beds in the State of Alabama, except those on Indian lands, is the program...

  17. Chemical inventory control program for mixed and hazardous waste facilities at SRS

    International Nuclear Information System (INIS)

    Ades, M.J.; Vincent, A.M. III.

    1997-01-01

    Mixed Waste (MW) and Hazardous Waste (HW) are being stored at the Savannah River Site (SRS) pending onsite and/or offsite treatment and disposal. The inventory control for these wastes has recently been brought under Technical Safety Requirements (TSR) in accordance with DOE Order 5480.22. With the TSRs was the question of the degree of rigor with which the inventory is to be tracked, considering that the variety of chemicals present, or that could be present, numbers in the hundreds. This paper describes the graded approach program to track Solid Waste (SW) inventories relative to TSRs. The approach uses a ratio of the maximum anticipated chemical inventory to the permissible inventory in accordance with Emergency Response Planning Guideline (ERPG) limits for on- and off-site receptors. A specific threshold ratio can then be determined. The chemicals above this threshold ratio are to be included in the chemical inventory control program. The chemicals that fall below the threshold ratio are managed in accordance with existing practice per State and RCRA hazardous materials requirements. Additionally, the facilities are managed in accordance with process safety management principles, specifically using process hazards analyses, which provides safety assurance for even the small quantities that may be excluded from the formal inventory control program. The method yields a practical approach to chemical inventory control, while maintaining appropriate chemical safety margins. The resulting number of specific chemicals that require inclusion in a rigorous inventory control program is greatly reduced by about 80%, thereby resulting in significant reduction in chemical data management while preserving appropriate safety margins

  18. State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, July-December 1980

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B. C.; Toth, W. J. [comps.

    1981-10-01

    The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. Background information is provided; program objectives and the technical approach that is used are discussed; and the benefits of the program are described. The summary of findings is presented. Prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are covered and findings and recommendations are summarized. The commercialization activities carried out by the respective state teams are described for the following: Colorado, Montana, New Mexico, North Dakota, South Dakota, Utah, and Wyoming.

  19. Iowa state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  20. California state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  1. Pennsylvania state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  2. Illinois state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Illinois. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  3. Illinois State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Illinois. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  4. Massachusetts state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  5. Florida state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  6. Massachusetts state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Massachusetts. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations.

  7. Oregon state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  8. Maryland State information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  9. Pennsylvania state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  10. Maryland State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Handbook Series Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  11. Pennsylvania state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Pennsylvania. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  12. Iowa state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, By Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Iowa. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations

  13. California state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of California. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full text of relevant statutes and regulations

  14. Florida state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-27

    This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the federal and state levels, the pertinent programs they administer, each affected state legislature, and current federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Florida. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  15. Maryland state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and State levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Maryland. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  16. Oregon state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  17. Oregon state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  18. Ohio state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1981-01-01

    This volume is one of a series produced under contract with the DOE, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Ohio. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations

  19. Ohio state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1981-02-09

    This volume is one of a series produced under contract with the DOE, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of Ohio. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; the full test of relevant statutes and regulations.

  20. Oregon state information handbook formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administater, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Oregon. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  1. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as ''the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as ''the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs

  2. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  3. Clean Energy Financing Programs: A Decision Resource for States and Communities

    Science.gov (United States)

    Describes financing-program options, key components of financing programs, and factors for states and communities to consider as they make decisions about getting started or updating their clean energy financing programs.

  4. Guidance documents relating to landfills and contaminants

    Energy Technology Data Exchange (ETDEWEB)

    Schomaker, N.B.; Zunt, D.A.

    1990-01-01

    The Environmental Protection Agency is developing and updating a series of Technical Guidance Documents to provide best engineering control technology to meet the needs of the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response Compensation and Liability Act (CERCLA), respectively. These documents are the compilation of the research efforts to date relating to containment of pollutants from waste disposal to the land as relates to residuals management. The specific areas of research being conducted under the RCRA land disposal program relates to laboratory, pilot and field validation studies in cover systems, waste leaching and solidification, liner systems and disposal facility evaluation. The specific areas of research being conducted under the CERCLA uncontrolled waste sites (Superfund) program relate to in situ treatment, solidification/stabilization for treating hazardous waste, combustion technologies, best demonstrated available technology (BDAT), on-site treatment technologies, emerging biosystems, expert systems, personnel health protection equipment, and site and situation assessment. The Guidance Documents are intended to assist both the regulated community and the permitting authorities, as well as the Program Offices, and Regions, as well as the states and other interested parties, with the latest information relevant to waste management.

  5. 77 FR 46964 - Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-08-07

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... Agency (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. The EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  6. 77 FR 29231 - Oklahoma: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2012-05-17

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... Agency (EPA) to authorize States to operate their hazardous waste management programs in lieu of the Federal program. The EPA uses the regulations entitled ``Approved State Hazardous Waste Management...

  7. 34 CFR 403.204 - What are the State's responsibilities for program evaluation and improvement?

    Science.gov (United States)

    2010-07-01

    ... APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the Administrative Responsibilities of a State Under the State Vocational and Applied Technology Education Program? § 403.204 What are the State's... description of vocational education strategies designed to improve the performance of the program as measured...

  8. Proposed equation of state experimental program at NOVA/NIF

    International Nuclear Information System (INIS)

    Holmes, N.C.; Cauble, R.; Celliers, P.; Collins, G.; DaSilva, L.; Hammel, B.; Stewart, R.; Strand, O.; Sullivan, A.

    1996-03-01

    The high pressure equations of state of materials must be accurately known for confident design, simulation, and interpretation of ICF target experiments and for weapons. Here, the authors sketch out a program to perform precise and accurate equation of state (EOS) experiments using large, high-power lasers. The program is divided into three phases: (1) a driver qualification program which will determine the necessary drive and target design parameters; (2) characterization of low and high-Z standard materials; (3) accurate impedance-match experiments to determine equations of state of materials of interest relative to the qualified standards. Novel methods are proposed for the first phase which are an order of magnitude more sensitive than those applied previously. They identify and describe the choices for standards and the samples slated for initial studies. In all cases, their goal is to obtain data that is of sufficiently high quality to serve for design purposes and to validate theories of material response at high pressures of the order of 1--10 TPa. This is particularly important right now, for materials such as CH plastics and hydrogen (DT). In addition, they will suggest a program for EOS measurements for P > 10 TPa, the region of maximum theoretical EOS uncertainty for many materials

  9. Radiochemistry Education and Research Program at the Pennsylvania State University

    International Nuclear Information System (INIS)

    Uenlue, Kenan

    2009-01-01

    A new Radiochemistry Education and Research Program was started at the Pennsylvania University, Radiation Science and Engineering Center. The program was initially supported by the Department of Energy, Radiochemistry Education Award Program (REAP). Using REAP funding as leverage we obtained support from the Los Alamos National Laboratory, Department of Homeland Security, Domestic Nuclear Detection Office, various internal funding from PSU and other entities. The PSU radiochemistry program primarily addresses radiochemistry education and secondarily nuclear and radiochemistry research. The education program consists of bolstering our existing radiochemistry and related courses; Nuclear and Radiochemistry, Radiation Detection and Measurement, Radiological Safety and developing new courses, e.g., Laboratory Experiments in Applied Nuclear and Radiochemistry, and Nuclear Methods in Science. A new laboratory has been created with state of the art equipment for the Laboratory Experiments in Applied Nuclear and Radiochemistry course. We also plan to revitalize the nuclear and radiochemistry research programs. We established a state-of-the-art Neutron Activation Analysis Laboratory and a gamma ray spectroscopy laboratory that has 10 stations including state-of-the-art nuclear spectroscopy hardware and software. In addition, we embarked on an expansion plan that included building a new neutron beam hall and neutron beam ports with a cold neutron source. One of the reasons to have a cold neutron source is for the development of a prompt gamma activation analysis facility. A detailed description of PSU radiochemistry education and research program will be given and the future plans will be discussed.

  10. Performance demonstration program plan for RCRA constituent analysis of solidified wastes

    International Nuclear Information System (INIS)

    1995-06-01

    Performance Demonstration Programs (PDPS) are designed to help ensure compliance with the Quality Assurance Objectives (QAOs) for the Waste Isolation Pilot Plant (WIPP). The PDPs are intended for use by the Department of Energy (DOE) Carlsbad Area Office (CAO) to assess and approve the laboratories and other measurement facilities supplying services for the characterization of WIPP TRU waste. The PDPs may also be used by CAO in qualifying laboratories proposing to supply additional analytical services that are required for other than waste characterization, such as WIPP site operations. The purpose of this PDP is to test laboratory performance for the analysis of solidified waste samples for TRU waste characterization. This performance will be demonstrated by the successful analysis of blind audit samples of simulated, solidified TRU waste according to the criteria established in this plan. Blind audit samples (hereinafter referred to as PDP samples) will be used as an independent means to assess laboratory performance regarding compliance with the QAOs. The concentration of analytes in the PDP samples will address levels of regulatory concern and will encompass the range of concentrations anticipated in actual waste characterization samples. Analyses that are required by the WIPP to demonstrate compliance with various regulatory requirements and which are included in the PDP must be performed by laboratories that demonstrate acceptable performance in the PDP. These analyses are referred to as WIPP analyses and the samples on which they are performed are referred to as WIPP samples for the balance of this document

  11. Communicating program outcomes to encourage policymaker support for evidence-based state tobacco control.

    Science.gov (United States)

    Schmidt, Allison M; Ranney, Leah M; Goldstein, Adam O

    2014-12-04

    Tobacco use, the leading cause of preventable death in the U.S., can be reduced through state-level tobacco prevention and cessation programs. In the absence of research about how to communicate the need for these programs to policymakers, this qualitative study aimed to understand the motivations and priorities of policymakers in North Carolina, a state that enacted a strong tobacco control program from 2003-2011, but drastically reduced funding in recent years. Six former legislators (three Democrats, three Republicans) and three lobbyists for health organizations were interviewed about their attitudes towards tobacco use, support of state-funded programs, and reactions to two policy briefs. Five themes emerged: (1) high awareness of tobacco-related health concerns but limited awareness of program impacts and funding, (2) the primacy of economic concerns in making policy decisions, (3) ideological differences in views of the state's role in tobacco control, (4) the impact of lobbyist and constituent in-person appeals, and (5) the utility of concise, contextualized data. These findings suggest that building relationships with policymakers to communicate ongoing program outcomes, emphasizing economic data, and developing a constituent advocacy group would be valuable to encourage continued support of state tobacco control programs.

  12. School-based Yoga Programs in the United States: A Survey.

    Science.gov (United States)

    Butzer, Bethany; Ebert, Marina; Telles, Shirley; Khalsa, Sat Bir S

    2015-01-01

    Substantial interest has begun to emerge around the implementation of yoga interventions in schools. Researchers have found that yoga practices may enhance skills such as self-regulation and prosocial behavior, and lead to improvements in students' performance. These researchers, therefore, have proposed that contemplative practices have the potential to play a crucial role in enhancing the quality of US public education. The purpose of the present study was to provide a summary and comparison of school-based yoga programs in the United States. Online, listserv, and database searches were conducted to identify programs, and information was collected regarding each program's scope of work, curriculum characteristics, teacher-certification and training requirements, implementation models, modes of operation, and geographical regions. The online, listserv, and database searches took place in Boston, MA, USA, and New Haven, CT, USA. Thirty-six programs were identified that offer yoga in more than 940 schools across the United States, and more than 5400 instructors have been trained by these programs to offer yoga in educational settings. Despite some variability in the exact mode of implementation, training requirements, locations served, and grades covered, the majority of the programs share a common goal of teaching 4 basic elements of yoga: (1) physical postures, (2) breathing exercises, (3) relaxation techniques, and (4) mindfulness and meditation practices. The programs also teach a variety of additional educational, social-emotional, and didactic techniques to enhance students' mental and physical health and behavior. The fact that the present study was able to find a relatively large number of formal, school-based yoga programs currently being implemented in the United States suggests that the programs may be acceptable and feasible to implement. The results also suggest that the popularity of school-based yoga programs may continue to grow.

  13. OLEM Center for Program Analysis Site Analysis Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — This asset includes environmental justice-related analyses of population located within a mile of Superfund and RCRA Corrective Action sites. It characterizes...

  14. 12 CFR 617.7430 - Are institutions required to participate in state agricultural loan mediation programs?

    Science.gov (United States)

    2010-01-01

    ... state agricultural loan mediation programs? 617.7430 Section 617.7430 Banks and Banking FARM CREDIT... Mediation Programs § 617.7430 Are institutions required to participate in state agricultural loan mediation programs? (a) If initiated by a borrower, System institutions must participate in state mediation programs...

  15. Industrial Energy Efficiency: Designing Effective State Programs for the Industrial Sector

    Energy Technology Data Exchange (ETDEWEB)

    Goldberg, Amelie [Institute for Industrial Productivity (United States); Taylor, Robert P. [Institute for Industrial Productivity (United States); Hedman, Bruce [Institute for Industrial Productivity (United States)

    2014-03-21

    This report provides state regulators, utilities, and other program administrators with an overview of U.S. industrial energy efficiency programs and assesses some of the key features of programs that have generated increased energy savings.

  16. 34 CFR 403.1 - What is the State Vocational and Applied Technology Education Program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What is the State Vocational and Applied Technology... TECHNOLOGY EDUCATION PROGRAM General § 403.1 What is the State Vocational and Applied Technology Education Program? (a) Under the State Vocational and Applied Technology Education Program, the Secretary makes...

  17. 75 FR 45583 - New York: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2010-08-03

    ...: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental Protection Agency... authorized hazardous waste program which is set forth in the regulations entitled ``Approved State Hazardous Waste Management Programs'', New York's authorized hazardous waste program. EPA will incorporate by...

  18. Final task force report on the Agreement State Program

    International Nuclear Information System (INIS)

    1977-12-01

    Section 274 of the Atomic Energy Act provides a statutory means by which the U.S. Nuclear Regulatory Commission may relinquish to the States a part of its regulatory authority over the use of source material, by-product material, and small quantities of special nuclear material. The Commission is required to retain regulatory authority over the licensing of nuclear facilities, exports and imports of nuclear materials and facilities, larger quantities of special nuclear material, and activities conducted by other Federal agencies which are not exempted by the Act. This study analyzes the NRC Agreement State Program to determine: whether the NRC should aggressively promote Agreement State status; whether the NRC should relinquish additional responsibility to the States and if so, which responsibilities and under what circumstances, and conversely if NRC should reassert authority in any areas; to what extent the NRC should continue to oversee State performance; and whether changes in the statute or regulations are desirable or required. At present, there are 25 states that have not opted for agreement status. Appendix A contains a discussion of the legislative history of Section 274, a report on the current status of the program, Agreement State review procedures, the full text of Section 274, a list of Agreement States, dates of agreements, number of licenses, a list of non-Agreement States, and numbers of NRC licenses in these States. Appendix B analyzes states' comments

  19. Financing Early Childhood Education Programs: State, Federal, and Local Issues

    Science.gov (United States)

    Hustedt, Jason T.; Barnett, W. Steven

    2011-01-01

    The landscape of financing early childhood education in the U.S. is complex. Programs run the gamut from tuition-supported private centers to public programs supported by federal, state, or local funds. Different funding streams are poorly coordinated. The federal government funds several major targeted programs that are available only to specific…

  20. RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 5, Technical Memorandums 06-09A, 06-10A, and 06-12A

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-09-01

    This report provides a detailed summary of the activities carried out to sample groundwater at Waste Area Grouping (WAG) 6. The analytical results for samples collected during Phase 1, Activity 2 of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI) are also presented. In addition, analytical results for Phase 1, activity sampling events for which data were not previously reported are included in this TM. A summary of the groundwater sampling activities of WAG 6, to date, are given in the Introduction. The Methodology section describes the sampling procedures and analytical parameters. Six attachments are included. Attachments 1 and 2 provide analytical results for selected RFI groundwater samples and ORNL sampling event. Attachment 3 provides a summary of the contaminants detected in each well sampled for all sampling events conducted at WAG 6. Bechtel National Inc. (BNI)/IT Corporation Contract Laboratory (IT) RFI analytical methods and detection limits are given in Attachment 4. Attachment 5 provides the Oak Ridge National Laboratory (ORNL)/Analytical Chemistry Division (ACD) analytical methods and detection limits and Resource Conservation and Recovery Act (RCRA) quarterly compliance monitoring (1988--1989). Attachment 6 provides ORNL/ACD groundwater analytical methods and detection limits (for the 1990 RCRA semi-annual compliance monitoring).

  1. Expanding Access and Opportunity: The Washington State Achievers Program

    Science.gov (United States)

    Ramsey, Jennifer; Gorgol, Laura

    2010-01-01

    In 2001, the Bill & Melinda Gates Foundation launched a 10-year, multi-million dollar initiative, the Washington State Achievers Program (WSA), to increase opportunities for low-income students to attend postsecondary institutions in Washington State. The Bill & Melinda Gates Foundation granted funds to the College Success Foundation…

  2. Equine-Facilitated Prison-Based Programs within the Context of Prison-Based Animal Programs: State of the Science Review

    Science.gov (United States)

    Bachi, Keren

    2013-01-01

    Equine-facilitated prison programs have become more prevalent and operate in correctional facilities in 13 states throughout the United States. However, there is a deficit of empirical knowledge to guide them. This article reviews 19 studies of prison-based animal programs and centers on patterns in the literature. It reveals how previous studies…

  3. Probabilistic programmable quantum processors with multiple copies of program states

    International Nuclear Information System (INIS)

    Brazier, Adam; Buzek, Vladimir; Knight, Peter L.

    2005-01-01

    We examine the execution of general U(1) transformations on programmable quantum processors. We show that, with only the minimal assumption of availability of copies of the 1-qubit program state, the apparent advantage of existing schemes proposed by G. Vidal et al. [Phys. Rev. Lett. 88, 047905 (2002)] and M. Hillery et al. [Phys. Rev. A 65, 022301 (2003)] to execute a general U(1) transformation with greater probability using complex program states appears not to hold

  4. School-based Yoga Programs in the United States: A Survey

    Science.gov (United States)

    Butzer, Bethany; Ebert, Marina; Telles, Shirley; Khalsa, Sat Bir S.

    2016-01-01

    Context Substantial interest has begun to emerge around the implementation of yoga interventions in schools. Researchers have found that yoga practices may enhance skills such as self-regulation and prosocial behavior, and lead to improvements in students’ performance. These researchers, therefore, have proposed that contemplative practices have the potential to play a crucial role in enhancing the quality of US public education. Objective The purpose of the present study was to provide a summary and comparison of school-based yoga programs in the United States. Design Online, listserv, and database searches were conducted to identify programs, and information was collected regarding each program’s scope of work, curriculum characteristics, teacher-certification and training requirements, implementation models, modes of operation, and geographical regions. Setting The online, listserv, and database searches took place in Boston, MA, USA, and New Haven, CT, USA. Results Thirty-six programs were identified that offer yoga in more than 940 schools across the United States, and more than 5400 instructors have been trained by these programs to offer yoga in educational settings. Despite some variability in the exact mode of implementation, training requirements, locations served, and grades covered, the majority of the programs share a common goal of teaching 4 basic elements of yoga: (1) physical postures, (2) breathing exercises, (3) relaxation techniques, and (4) mindfulness and meditation practices. The programs also teach a variety of additional educational, social-emotional, and didactic techniques to enhance students’ mental and physical health and behavior. Conclusions The fact that the present study was able to find a relatively large number of formal, school-based yoga programs currently being implemented in the United States suggests that the programs may be acceptable and feasible to implement. The results also suggest that the popularity of school

  5. Nuclear Security Education Program at the Pennsylvania State University

    International Nuclear Information System (INIS)

    Uenlue, Kenan; Jovanovic, Igor

    2015-01-01

    The availability of trained and qualified nuclear and radiation security experts worldwide has decreased as those with hands-on experience have retired while the demand for these experts and skills have increased. The U.S. Department of Energy's National Nuclear Security Administration's (NNSA) Global Threat Reduction Initiative (GTRI) has responded to the continued loss of technical and policy expertise amongst personnel and students in the security field by initiating the establishment of a Nuclear Security Education Initiative, in partnership with Pennsylvania State University (PSU), Texas A and M (TAMU), and Massachusetts Institute of Technology (MIT). This collaborative, multi-year initiative forms the basis of specific education programs designed to educate the next generation of personnel who plan on careers in the nonproliferation and security fields with both domestic and international focus. The three universities worked collaboratively to develop five core courses consistent with the GTRI mission, policies, and practices. These courses are the following: Global Nuclear Security Policies, Detectors and Source Technologies, Applications of Detectors/Sensors/Sources for Radiation Detection and Measurements Nuclear Security Laboratory, Threat Analysis and Assessment, and Design and Analysis of Security Systems for Nuclear and Radiological Facilities. The Pennsylvania State University (PSU) Nuclear Engineering Program is a leader in undergraduate and graduate-level nuclear engineering education in the USA. The PSU offers undergraduate and graduate programs in nuclear engineering. The PSU undergraduate program in nuclear engineering is the largest nuclear engineering programs in the USA. The PSU Radiation Science and Engineering Center (RSEC) facilities are being used for most of the nuclear security education program activities. Laboratory space and equipment was made available for this purpose. The RSEC facilities include the Penn State Breazeale

  6. Nuclear Security Education Program at the Pennsylvania State University

    Energy Technology Data Exchange (ETDEWEB)

    Uenlue, Kenan [The Pennsylvania State University, Radiation Science and Engineering Center, University Park, PA 16802-2304 (United States); The Pennsylvania State University, Department of Mechanical and Nuclear Engineering, University Park, PA 16802-2304 (United States); Jovanovic, Igor [The Pennsylvania State University, Department of Mechanical and Nuclear Engineering, University Park, PA 16802-2304 (United States)

    2015-07-01

    The availability of trained and qualified nuclear and radiation security experts worldwide has decreased as those with hands-on experience have retired while the demand for these experts and skills have increased. The U.S. Department of Energy's National Nuclear Security Administration's (NNSA) Global Threat Reduction Initiative (GTRI) has responded to the continued loss of technical and policy expertise amongst personnel and students in the security field by initiating the establishment of a Nuclear Security Education Initiative, in partnership with Pennsylvania State University (PSU), Texas A and M (TAMU), and Massachusetts Institute of Technology (MIT). This collaborative, multi-year initiative forms the basis of specific education programs designed to educate the next generation of personnel who plan on careers in the nonproliferation and security fields with both domestic and international focus. The three universities worked collaboratively to develop five core courses consistent with the GTRI mission, policies, and practices. These courses are the following: Global Nuclear Security Policies, Detectors and Source Technologies, Applications of Detectors/Sensors/Sources for Radiation Detection and Measurements Nuclear Security Laboratory, Threat Analysis and Assessment, and Design and Analysis of Security Systems for Nuclear and Radiological Facilities. The Pennsylvania State University (PSU) Nuclear Engineering Program is a leader in undergraduate and graduate-level nuclear engineering education in the USA. The PSU offers undergraduate and graduate programs in nuclear engineering. The PSU undergraduate program in nuclear engineering is the largest nuclear engineering programs in the USA. The PSU Radiation Science and Engineering Center (RSEC) facilities are being used for most of the nuclear security education program activities. Laboratory space and equipment was made available for this purpose. The RSEC facilities include the Penn State Breazeale

  7. The SC State NSF PAARE Program

    Science.gov (United States)

    Walter, Donald; Ajello, Marco; Brittain, Sean; Cash, Jennifer; Fogle, Bryan; Hartmann, Dieter; Ho, Shirley; Howell, Steve; King, Jeremy; Leising, Mark; Smith, Daniel

    2018-01-01

    We report on the activities of our NSF PAARE program during Year 3 of the project. Our partnership under this award includes South Carolina State University (a Historically Black College/University), Clemson University (a Ph.D. granting institution) and individual investigators at NASA Ames and elsewhere. Our partnership with the Citizen CATE Experiment and involvement in the total solar eclipse which passed through our campus on August 21, 2017, will be discussed. The PAARE project continues to strengthen our partnership with Clemson. We are close to completing a memorandum of agreement between the two institutions that will allow for the seamless transfer of an undergraduate from SC State to Clemson’s graduate program in physics and astronomy. Additionally, we have worked together under the Citizen CATE project and through other research activities. SC State is a member of the National Astronomy Consortium (NAC) and participates through its faculty and undergraduates, one of whom (Wesley Red) is reporting on his summer internship at this conference. We also served as the state coordinator for South Carolina for the Citizen CATE Experiment. The August 21st path of totality crossed through our campus and the campus of our partner Clemson University. Additional colleges, universities and citizen scientist groups partnered with us to provide 7 sites of coverage across South Carolina from the foothills of the Appalachian mountains to the Atlantic Ocean near the site of departure of the shadow from the continental U.S. Support for this work includes our NSF PAARE award AST-1358913 as well as resources and support provided by Clemson University and the National Optical Astronomy Observatory. CATE work has been supported by NASA SMD award NNX16AB92A to the National Solar Observatory. Additional details can be found at: http://physics.scsu.edu

  8. Sustainable Materials Management: U.S. State Data Measurement Sharing Program

    Science.gov (United States)

    The State Data Measurement Sharing Program (SMP) is an online reporting, information sharing, and measurement tool that allows U.S. states to share a wide range of information about waste, recycling, and composting.

  9. Government regulation of forestry practices on private forest land in the United States: an assessment of state government responsibilities and program performance

    Science.gov (United States)

    Paul V. Ellefson; Michael A. Kilgore; James E. Granskog

    2006-01-01

    In 2003, a comprehensive assessment of state government, forest practice regulatory programs in the United States was undertaken. Involved was an extensive review of the literature and information gathering h m program administration in all 50 states. The assessment determined that regulatory programs focus on a wide range of forestry practices applied to private...

  10. Energy Extension Service Pilot Program: evaluation report after two years. Volume II. State reports

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-04-01

    This report, Vol. II, presents a discussion of the operations of the ten EES pilot state programs during the period from October 1, 1977 through September 30, 1979. Each of the ten pilot states - Alabama, Connecticut, Michigan, New Mexico, Pennsylvania, Tennessee, Texas, Washington, Wisconsin, and Wyoming - received a grant of approximately $1.1 million to develop and implement an 18-month program beginning on October 1, 1977. In September 1978, each State received an additional $370,000 for service-delivery programs for the extension of the pilot program, April 1979 through September 1979. A case-study description of the operations of the pilot program in each State is provided here, with special attention given to the two programs selected in each State for more-detailed study and survey research. Although the thrust of this volume is descriptive, some survey data and analyses are presented for the emphasis programs. Two telephone surveys of clients and a non-client sample were conducted, one at the end of the first year of the pilot program (October 1977 - September 1978) and one at the end of the second year (October 1978 - September 1979).

  11. Regulation and perceived compliance: Nonpoint pollution reduction programs in four states

    International Nuclear Information System (INIS)

    Floyd, D.W.; MacLeod, M.A.

    1993-01-01

    Examining nonpoint-source water pollution programs in foresty is one way of looking at the complicated policy questions of striking a balance between voluntary and regulatory approaches to forest management on private lands. States have developed a variety of approaches in this area from completely voluntary to highly regulatory to archeive compliance. This article looks at several aspects: federal requirements, program types, predictive behavior theories, and specific state programs (Ohio, West Virginia, Maryland, Massachusetts). The study results indicate a significant difference in preceived compliance based on program type: as stringency increases, perceived compliance increases. The authors suggest that successful forestry nonpoint source water pollution reduction plans should combine regulatory and educational elements. 16 refs., 3 tabs

  12. Fresno State joins CERN-related program to explore cutting edge physics

    CERN Multimedia

    2008-01-01

    California State University, Fresno has joined a collaboration of top physicists to work with what scientists believe will be the driving force behind high-energy physics for the foreseeable future. The program is the ATLAS (an acronym for A Toroidal LHC ApparatuS) experiment, which makes use of the Large Hadron Collider under construction at the European Organization for Nuclear Research (CERN) near Geneva, Switzerland. Fresno State says it is the only one of the 23 California State University system schools participating in the LHC program and CERN.

  13. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    International Nuclear Information System (INIS)

    1980-01-01

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses

  14. New Jersey state information handbook: Formerly Utilized Sites Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-31

    Under the implied authority of the Atomic Energy Act of 1954, as amended, radiological surveys and research work has been conducted to determine radiological conditions at former MED/AEC sites. As of this time, 31 sites in 13 states have been identified that require or may require remedial action. This volume is one of a series produced under contract with DOE, Office of Nuclear Waste Management, by POLITECH CORPORATION to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the state of New Jersey. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations. The loose-leaf format used in these volumes will allow the material to be updated periodically as the Remedial Action Program progresses.

  15. Sex Offender Rehabilitation Programs in State Prisons: A Nationwide Survey.

    Science.gov (United States)

    Sapp, Allen D.; Vaughn, Michael S.

    1991-01-01

    Examined programs and strategies for rehabilitation used in adult sex offender treatment programs in state-operated adult correctional institutions. Questionnaires were completed by 73 adult sex offender treatment providers. The results revealed that incarcerated adult sex offenders were receiving comprehensive psychotherapy and behavior…

  16. Aircraft wake vortices : a state-of-the-art review of the United States R&D program

    Science.gov (United States)

    1977-02-28

    The report summarizes the current state-of-the-art understanding : of the aircraft wake vortex phenomenon and the results of the United : States program to minimize the restrictions caused by aircraft wake : vortices in the terminal environment. The ...

  17. 77 FR 47302 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revisions

    Science.gov (United States)

    2012-08-08

    ...: Final Authorization of State Hazardous Waste Management Program Revisions AGENCY: Environmental... EPA proposed to authorize South Dakota's State Hazardous waste management Program revisions published... to the hazardous waste program revisions submitted by South Dakota. The Agency published a Proposed...

  18. New Mexico state information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  19. New York state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying our the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  20. New Mexico state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  1. New Mexico state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Informaion Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  2. New York state information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations

  3. New York state information handbook formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying our the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New York. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  4. New Mexico state information handbook formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Informaion Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of New Mexico. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; and the full text of relevant statutes and regulations.

  5. Oak Ridge Reservation Site Management Plan for the Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This site management for the Environmental Restoration (ER) Program implements the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) (EPA 1990), also known as an Interagency Agreement (IAG), hereafter referred to as the Agreement.'' The Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC), hereafter known as the Parties,'' entered into this Agreement for the purpose of coordinating remediation activities undertaken on the ORR to comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) as amended by the Superfund Amendments, the Resource Conservation and Recovery Act (RCRA), and the National Environmental Policy Act (NEPA). 7 refs., 17 figs.

  6. 76 FR 34953 - Funding Opportunity Title: Risk Management Education in Targeted States (Targeted States Program...

    Science.gov (United States)

    2011-06-15

    ... Availability C. Location and Target Audience D. Maximum Award E. Project Period F. Description of Agreement..., 2011. C. Location and Target Audience The RMA Regional Offices that service the Targeted States are... marketing systems to pursue new markets. D. Purpose The purpose of the Targeted States Program is to provide...

  7. 75 FR 17332 - Idaho: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2010-04-06

    ...: Incorporation by Reference of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection... ``Approved State Hazardous Waste Management Programs,'' Idaho's authorized hazardous waste program. The EPA... regulations that are authorized and that the EPA will enforce under the Solid Waste Disposal Act, commonly...

  8. 40 CFR 147.2550 - State-administered program-Class I, III, IV and V wells.

    Science.gov (United States)

    2010-07-01

    ... Regulatory Authority for Assumption of the Underground Injection Control Program Pursuant to the Federal Safe... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... following elements as submitted to EPA in the State's program application: (a) Incorporation by reference...

  9. 77 FR 3224 - New Mexico: Incorporation by Reference of State Hazardous Waste Management Program

    Science.gov (United States)

    2012-01-23

    ... Mexico: Incorporation by Reference of State Hazardous Waste Management Program AGENCY: Environmental... entitled ``Approved State Hazardous Waste Management Programs,'' New Mexico's authorized hazardous waste... of the State regulations that are authorized and that the EPA will enforce under the Solid Waste...

  10. Missouri State information handbook: formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations

  11. Missouri State information handbook: formerly utilized sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations, and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations.

  12. Developmental Programming: State-of-the-Science and Future Directions

    Science.gov (United States)

    Sutton, Elizabeth F.; Gilmore, L. Anne; Dunger, David B.; Heijmans, Bas T.; Hivert, Marie-France; Ling, Charlotte; Martinez, J. Alfredo; Ozanne, Susan E.; Simmons, Rebecca A.; Szyf, Moshe; Waterland, Robert A.; Redman, Leanne M.; Ravussin, Eric

    2016-01-01

    Objective On December 8–9, 2014, the Pennington Biomedical Research Center convened a scientific symposium to review the state-of-the-science and future directions for the study of developmental programming of obesity and chronic disease. The objectives of the symposium were to discuss: (i) past and current scientific advances in animal models, population-based cohort studies and human clinical trials, (ii) the state-of-the-science of epigenetic-based research, and (iii) considerations for future studies. Results The overarching goal was to provide a comprehensive assessment of the state of the scientific field, to identify research gaps and opportunities for future research in order to identify and understand the mechanisms contributing to the developmental programming of health and disease. Conclusions Identifying the mechanisms which cause or contribute to developmental programming of future generations will be invaluable to the scientific and medical community. The ability to intervene during critical periods of prenatal and early postnatal life to promote lifelong health is the ultimate goal. Considerations for future research including the use of animal models, the study design in human cohorts with considerations about the timing of the intrauterine exposure and the resulting tissue specific epigenetic signature were extensively discussed and are presented in this meeting summary. PMID:27037645

  13. Communicating Program Outcomes to Encourage Policymaker Support for Evidence-Based State Tobacco Control

    Directory of Open Access Journals (Sweden)

    Allison M. Schmidt

    2014-12-01

    Full Text Available Tobacco use, the leading cause of preventable death in the U.S., can be reduced through state-level tobacco prevention and cessation programs. In the absence of research about how to communicate the need for these programs to policymakers, this qualitative study aimed to understand the motivations and priorities of policymakers in North Carolina, a state that enacted a strong tobacco control program from 2003–2011, but drastically reduced funding in recent years. Six former legislators (three Democrats, three Republicans and three lobbyists for health organizations were interviewed about their attitudes towards tobacco use, support of state-funded programs, and reactions to two policy briefs. Five themes emerged: (1 high awareness of tobacco-related health concerns but limited awareness of program impacts and funding, (2 the primacy of economic concerns in making policy decisions, (3 ideological differences in views of the state’s role in tobacco control, (4 the impact of lobbyist and constituent in-person appeals, and (5 the utility of concise, contextualized data. These findings suggest that building relationships with policymakers to communicate ongoing program outcomes, emphasizing economic data, and developing a constituent advocacy group would be valuable to encourage continued support of state tobacco control programs.

  14. 40 CFR 147.2551 - State-administered program-Class II wells.

    Science.gov (United States)

    2010-07-01

    ..., “Re: Application for Primacy in the Regulation of Class II Injection Wells,” March 8, 1982; (5) Letter... Class II Injection Wells under Section 1425 of the Safe Drinking Water Act,” November 1981; (2) Letter...) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS...

  15. State registration and inspection programs for particle accelerators

    International Nuclear Information System (INIS)

    Bailey, E.D.

    1976-01-01

    The Suggested State Regulations for Control of Radiation(SSRCR) are recommended by the Council of State Governments and the National Conference of Radiation Control Program Directors as the model regulations which states should adopt in order to have adequate regulation and uniformity from state to state. These regulations are used as a basis for reviewing the current status of accelerator regulation in each state. The SSRCR does contain a separate part for registration (Part B--Registration of Radiation Machine Facilities and Services) and a separate part (Part I--Radiation Safety Requirements for Particle Accelerators) with specific requirements for the possession and use of accelerators. In addition, medical accelerators have additional requirements in Part F--X-Rays in The Heating Acts. These regulations specify requirements related to limitations of use, shielding and safety design requirements, control and interlock systems, warning devices, operating procedures, radiation monitoring, and calibration of medical accelerators

  16. 34 CFR 403.63 - How does a State carry out the State Vocational and Applied Technology Education Program?

    Science.gov (United States)

    2010-07-01

    ... Applied Technology Education Program? 403.63 Section 403.63 Education Regulations of the Offices of the... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Kinds of Activities Does the Secretary Assist Under... Technology Education Program? (a) Unless otherwise indicated in the regulations in this part, a State board...

  17. Site remediation technologies and environmental management practices in the utility industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    Sessions covered: chemical oxidation; DNAPL and source management; regulatory perspectives and state programs; manufactured gas plant site management; sediments, cyanides, and other issues at MGP sites; biotechnology applications; agricultural waste issues; risk communication and bioremediation; air emissions and air toxics management; project management and redevelopment; environmentally acceptable endpoint and risk-based site management; site assessment, background concentration and closure; risk communication and beneficial use by recycling; PCB and RCRA issues; and phytoremediation and bioremediation of wastes.

  18. INEEL Radioactive Liquid Waste Reduction Program

    International Nuclear Information System (INIS)

    Millet, C.B.; Tripp, J.L.; Archibald, K.E.; Lauerhauss, L.; Argyle, M.D.; Demmer, R.L.

    1999-01-01

    Reduction of radioactive liquid waste, much of which is Resource Conservation and Recovery Act (RCRA) listed, is a high priority at the Idaho National Technology and Engineering Center (INTEC). Major strides in the past five years have lead to significant decreases in generation and subsequent reduction in the overall cost of treatment of these wastes. In 1992, the INTEC, which is part of the Idaho National Environmental and Engineering Laboratory (INEEL), began a program to reduce the generation of radioactive liquid waste (both hazardous and non-hazardous). As part of this program, a Waste Minimization Plan was developed that detailed the various contributing waste streams, and identified methods to eliminate or reduce these waste streams. Reduction goals, which will reduce expected waste generation by 43%, were set for five years as part of this plan. The approval of the plan led to a Waste Minimization Incentive being put in place between the Department of Energy Idaho Office (DOE-ID) and the INEEL operating contractor, Lockheed Martin Idaho Technologies Company (LMITCO). This incentive is worth $5 million dollars from FY-98 through FY-02 if the waste reduction goals are met. In addition, a second plan was prepared to show a path forward to either totally eliminate all radioactive liquid waste generation at INTEC by 2005 or find alternative waste treatment paths. Historically, this waste has been sent to an evaporator system with the bottoms sent to the INTEC Tank Farm. However, this Tank Farm is not RCRA permitted for mixed wastes and a Notice of Non-compliance Consent Order gives dates of 2003 and 2012 for removal of this waste from these tanks. Therefore, alternative treatments are needed for the waste streams. This plan investigated waste elimination opportunities as well as treatment alternatives. The alternatives, and the criteria for ranking these alternatives, were identified through Value Engineering meetings with all of the waste generators. The most

  19. State geothermal commercialization programs in seven Rocky Mountain states. Semiannual progress report, July-December 1981

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C. (ed.)

    1982-08-01

    The activities and findings of the seven state commercialization teams participating in the Rocky Mountain Basin and Range commercialization program are described. The period covered is July through December 1981. Background information is provided, program objectives and the technical approach used are discussed, and the benefits of the program are described. Prospect identification, area development plans, site specific development analyses, time-phased project plans, the aggregated prospective geothermal energy use, and institutional analyses are discussed. Public outreach activities are covered and findings and recommendations are summarized.

  20. Description and comparison of pharmacy technician training programs in the United States.

    Science.gov (United States)

    Anderson, Douglas C; Draime, Juanita A; Anderson, Timothy S

    2016-01-01

    To describe pharmacy technician training programs in the United States and to compare pharmacy technician program characteristics between programs with and without a pharmacist on faculty and between programs with different accreditation status. Descriptive, cross-sectional study. Not applicable. United States pharmacy technician programs. Not applicable. Student class size, faculty credentials, coursework components, program length, tuition rates, and admission criteria. Currently, there are more than 698 pharmacy technician programs across 1114 campuses, with complete data available for 216 programs. Programs varied widely in terms of class sizes, faculty credentials, and admission criteria. Programs with pharmacists on faculty were significantly less expensive than were those without pharmacists (P = 0.009). Accreditation had no impact on tuition prices. This is the first study of its kind to describe and characterize pharmacy technician training programs. There is relatively little control of technician training by the profession of pharmacy. The quality of these programs in terms of student outcomes is unknown, and it should be explored. Rigorous debate and discussion is needed regarding the future of pharmacy technician roles and the training required for those roles. Copyright © 2016 American Pharmacists Association®. Published by Elsevier Inc. All rights reserved.

  1. An Examination of Peer-Delivered Parenting Skills Programs Across New York State.

    Science.gov (United States)

    Acri, Mary C; Craig, Nancy; Adler, Josh

    2018-03-24

    Peers are an important adjunct to the public mental health service system, and are being increasingly utilized across the country as a cost-effective solution to workforce shortages. Despite the tremendous growth of peer-delivered support over the past two decades, it has only been within the past few years that peer programs have been the subject of empirical inquiry. The purpose of this study was to examine the prevalence and characteristics of peer-delivered parenting programs across the New York State public mental health service system. We surveyed 46 family peer organizations across New York State regarding their delivery of structured peer-delivered parenting programs. Thirty-four (76%) completed the questionnaire, and of them, 18 (53%) delivered a parenting program. Subsequent interviews with seven of the 18 organizations revealed peer organizations had been delivering eight unique parenting programs for upwards of two decades. Additionally, organizations offered multiple supports to families to participate. Training, supervision, and issues around fidelity are discussed, as well as the implications of this study for states utilizing a peer workforce.

  2. A Review of Technical Communication Programs Outside the United States.

    Science.gov (United States)

    Alred, Gerald J.

    2001-01-01

    Examines technical communication programs outside the United States and comments on such features as their location in the university structure, links with public relations, the inclusion of internships or practicums, the balance of theory and practice, and typical course offerings. Lists a dozen major programs in seven countries. Concludes that…

  3. Energy extension service pilot program evaluation report: the first year. Volume II: pilot state reports

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    Volume II of the Energy Extension Service Evaluation presents a discussion of the operations of the ten EES pilot-state programs during the period from October 1, 1977 through September 30, 1978. Each of the ten pilot states - Alabama, Connecticut, Michigan, New Mexico, Pennsylvania, Tennessee, Texas, Washington, Wisconsin, and Wyoming - received a grant of approximately $1.1 million to develop and implement a 19-month program beginning on October 1, 1977. Volume II provides a case-study description of the operations of the pilot program in each state, with special attention given to the two programs selected in each state for more detailed study and survey research. Some survey data and analysis are presented for the emphasis programs.

  4. Evaluation of the riparian forest state program in Pitangueiras county, Parana

    OpenAIRE

    Peres, Marli Candalaft Alcantara Parra; Universidade Estadual de Londrina/UEL; Ralisch, Ricardo; Universidade Estadual de Londrina/UEL; Ripol, Cristovon Videira; Instituto Paranaense de Assistência Técnica e Extensão Rural do Paraná/EMATER

    2009-01-01

    Riparian forest restoration is fundamental for maintenance of vegetable, animal and human life. The objective of this study was to evaluate the efficiency of a Riparian Forest state program in the enlargement of the riparian forests in Pitangueiras county, state of Paraná, in the period of 2004 to 2006. Concerning the riparian reforestation, it was ansewered the reasons that convinced the farmers to join the program, the main difficulties found in its execution, and their views on environment...

  5. Missouri state information handbook formerly utilized sites remedial action program

    International Nuclear Information System (INIS)

    1980-01-01

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and rgulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the State of Missouri. It contains: a description of the state executive branch structure; a summary of relevant state statutes and regulations; a description of the structure of the state legislature, identification of the officers and committee chairmen, and a summary of recent relevant legislative action; a description of the organization and structure of local governments affected by remedial action at the St. Louis area sites; a summary of relevant local ordinances and regulations; an identification of relevant public interest groups; a list of radio stations, television stations and newspapers that provide public information to the St. Louis area or to Jefferson City; and the full text of relevant statutes and regulations

  6. Prevalent Approaches to Professional Development in State 4-H Programs

    Science.gov (United States)

    Smith, Martin H.; Worker, Steven M.; Schmitt-McQuitty, Lynn; Meehan, Cheryl L.; Lewis, Kendra M.; Schoenfelder, Emily; Brian, Kelley

    2017-01-01

    High-quality 4-H programming requires effective professional development of educators. Through a mixed methods study, we explored professional development offered through state 4-H programs. Survey results revealed that both in-person and online delivery modes were used commonly for 4-H staff and adult volunteers; for teen volunteers, in-person…

  7. 78 FR 45208 - Children's Health Insurance Program (CHIP); Final Allotments to States, the District of Columbia...

    Science.gov (United States)

    2013-07-26

    ... 0938-AR79 Children's Health Insurance Program (CHIP); Final Allotments to States, the District of... and expand health insurance coverage to uninsured, low-income children under the Children's Health...). States may implement the Children's Health Insurance Program (CHIP) through a separate state program...

  8. Potential CERCLA reauthorization issues relevant to US DOE's Environmental Restoration Program

    International Nuclear Information System (INIS)

    Siegel, M.R.; McKinney, M.D.; Jaksch, J.A.; Dailey, R.L.

    1993-02-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) is currently scheduled to be reauthorized in 1994. The US Department of Energy (DOE) has a significant stake in CERCLA reauthorization. CERCLA, along with its implementing regulation, the National Contingency Plan (NCP), is the principal legal authority governing DOE's environmental restoration program. The manner in which CERCLA-related issues are identified, evaluated, and dispatched may have a substantial impact on DOE's ability to conduct its environmental restoration program. A number of issues that impact DOE's environmental restoration program could be addressed through CERCLA reauthorization. These issues include the need to (1) address how the National Environmental Policy Act (NEPA) should be integrated into DOE CERCLA actions, (2) facilitate the streamlining of the Superfund process at DOE sites, (3) address the conflicts between the requirements of CERCLA and the Resource Conservation and Recovery Act (RCRA) that are especially relevant to DOE, (4) examine the criteria for waiving applicable or relevant and appropriate requirements (ARARs) at DOE sites, and (5) delineate the appropriate use of institutional controls at DOE sites

  9. 44 CFR 204.25 - FEMA-State agreement for fire management assistance grant program.

    Science.gov (United States)

    2010-10-01

    ... GRANT PROGRAM Declaration Process § 204.25 FEMA-State agreement for fire management assistance grant... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false FEMA-State agreement for fire management assistance grant program. 204.25 Section 204.25 Emergency Management and Assistance FEDERAL...

  10. ASTDD Synopses of State Oral Health Programs - Selected indicators

    Data.gov (United States)

    U.S. Department of Health & Human Services — 2011-2017. The ASTDD Synopses of State Oral Health Programs contain information useful in tracking states’ efforts to improve oral health and contributions to...

  11. Characterization of sediment in a leaching trench RCRA (Resource Conservation and Recovery Act) site

    International Nuclear Information System (INIS)

    Zimmerman, M.G.; Kossik, C.D.

    1988-01-01

    Hazardous materials potentially were disposed of into a pair of leaching trenches from 1975 until Resource Conservation and Recovery Act (RCRA) regulations were imposed in 1985. These leaching trenches now are used for disposal of nonhazardous process water. The typical effluent (approximately 3 million gal/d) consisted of water with trace quantities of laboratory, maintenance, and fuel fabrication process chemicals. The largest constituent in the waste stream was uranium in low concentrations. This paper describes the project used to analyze and characterize the sediments in and below the leaching trenches. Two phases of sediment sampling were performed. The first phase consisted of taking samples between the bottom of the trenches and groundwater to locate contamination in the deep sediments under the trenches. To accomplish this sampling, a series of wells were drilled, and samples were obtained for every five feet in depth. The second phase consisted of samples taken at three depths in a series of positions along each trench. Sampling was completed to determine contamination levels in the shallow sediments and loose material washed into the trenches from the process sewer system. The project results were that no measurable contamination was found in the deep sediments. Measurable contamination from metals, such as chromium and nickel, was found in the shallow sediments. The primary contaminant in the shallow sediments was uranium. The concentration of contaminants decreased rapidly to near-background levels at shallow depths below the bottoms of the trenches

  12. A Study of the Development of Students' Visualizations of Program State during an Elementary Object-Oriented Programming Course

    Science.gov (United States)

    Sajaniemi, Jorma; Kuittinen, Marja; Tikansalo, Taina

    2008-01-01

    Students' understanding of object-oriented (OO) program execution was studied by asking students to draw a picture of a program state at a specific moment. Students were given minimal instructions on what to include in their drawings in order to see what they considered to be central concepts and relationships in program execution. Three drawing…

  13. 76 FR 19174 - State Trade and Export Promotion (STEP) Pilot Grant Program

    Science.gov (United States)

    2011-04-06

    ... Grant Program is to increase the number of small businesses that are exporting, and increase the value... SMALL BUSINESS ADMINISTRATION State Trade and Export Promotion (STEP) Pilot Grant Program AGENCY: Office of International Trade; U.S. Small Business Administration (SBA) ACTION: SBA Program Announcement...

  14. Managing previously disposed waste to today's standards

    International Nuclear Information System (INIS)

    1990-01-01

    A Radioactive Waste Management Complex (RWMC) was established at the Idaho National Engineering Laboratory (INEL) in 1952 for controlled disposal of radioactive waste generated at the INEL. Between 1954 and 1970 waste characterized by long lived, alpha emitting radionuclides from the Rocky Flats Plant was also buried at this site. Migration of radionuclides and other hazardous substances from the buried Migration of radionuclides and other hazardous substances from the buried waste has recently been detected. A Buried Waste Program (BWP) was established to manage cleanup of the buried waste. This program has four objectives: (1) determine contaminant sources, (2) determine extent of contamination, (3) mitigate migration, and (4) recommend an alternative for long term management of the waste. Activities designed to meet these objectives have been under way since the inception of the program. The regulatory environment governing these activities is evolving. Pursuant to permitting activities under the Resource Conservation and Recovery Act (RCRA), the Department of Energy (DOE) and the Environmental Protection Agency (EPA) entered into a Consent Order Compliance Agreement (COCA) for cleanup of past practice disposal units at the INEL. Subsequent to identification of the RWMC as a release site, cleanup activities proceeded under dual regulatory coverage of RCRA and the Atomic Energy Act. DOE, EPA, and the State of Idaho are negotiating a RCRA/Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Interagency Agreement (IAG) for management of waste disposal sites at the INEL as a result of the November 1989 listing of the INEL on the National Priority List (NPL). Decision making for selection of cleanup technology will be conducted under the CERCLA process supplemented as required to meet the requirements of the National Environmental Policy Act (NEPA). 7 figs

  15. SIMPSON: A general simulation program for solid-state NMR spectroscopy

    Science.gov (United States)

    Bak, Mads; Rasmussen, Jimmy T.; Nielsen, Niels Chr.

    2011-12-01

    A computer program for fast and accurate numerical simulation of solid-state NMR experiments is described. The program is designed to emulate a NMR spectrometer by letting the user specify high-level NMR concepts such as spin systems, nuclear spin interactions, RF irradiation, free precession, phase cycling, coherence-order filtering, and implicit/explicit acquisition. These elements are implemented using the Tel scripting language to ensure a minimum of programming overhead and direct interpretation without the need for compilation, while maintaining the flexibility of a full-featured programming language. Basicly, there are no intrinsic limitations to the number of spins, types of interactions, sample conditions (static or spinning, powders, uniaxially oriented molecules, single crystals, or solutions), and the complexity or number of spectral dimensions for the pulse sequence. The applicability ranges from simple ID experiments to advanced multiple-pulse and multiple-dimensional experiments, series of simulations, parameter scans, complex data manipulation/visualization, and iterative fitting of simulated to experimental spectra. A major effort has been devoted to optimizing the computation speed using state-of-the-art algorithms for the time-consuming parts of the calculations implemented in the core of the program using the C programming language. Modification and maintenance of the program are facilitated by releasing the program as open source software (General Public License) currently at http://nmr.imsb.au.dk. The general features of the program are demonstrated by numerical simulations of various aspects for REDOR, rotational resonance, DRAMA, DRAWS, HORROR, C7, TEDOR, POST-C7, CW decoupling, TPPM, F-SLG, SLF, SEMA-CP, PISEMA, RFDR, QCPMG-MAS, and MQ-MAS experiments.

  16. 48 CFR 652.219-72 - Department of State Mentor-Protégé Program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Department of State Mentor....219-72 Department of State Mentor-Protégé Program. As prescribed in 619.202-70(o)(1), insert the following provision: Department of State Mentor-Protégé Program (APR 2004) (a) Large and small businesses...

  17. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  18. Outdoor Education Academic Programs in the United States

    Science.gov (United States)

    Bell, Brent J.; Seaman, Jayson; Trauntvein, Nate

    2017-01-01

    The growth of outdoor adventure programs developed, in part, from the Outward Bound movement in the 1970s (MacArthur, 1979; Outward Bound, 1968), which created a demand for specialized collegiate training. Since the inaugural conference on outdoor pursuits in higher education at Appalachian State University in 1974 (Smathers, 1974), approximately…

  19. Work and Family Programs in Texas State Agencies.

    Science.gov (United States)

    Texas Work and Family Clearinghouse, Austin.

    A survey of work and family policies in state-supported organizations in Texas was conducted for the Texas Workforce Commission's Work and Family Clearinghouse. Survey questions addressed the prevalence, perceived need, and future direction of dependent care programs and flexible work arrangements (FWA). Key findings in dependent care include: (1)…

  20. Closure Report (CR) for Corrective Action Unit (CAU) 91: Area 3 U-3fi Injection Well with Errata Sheet and Certification, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Navarro Nevada Environmental Services

    2010-08-10

    The closure report for CAU 91 has no Use Restriction Form or drawing/map included in the document to describe the use restricted area, however, Section 3.3.3 states that the site will be fenced and signage placed indicating the area as a Resource Conservation and Recovery Act (RCRA) Unit. The drawing that was placed in the FFACO indicating the use restricted area lists the coordinates for the RCRA Unit in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner, which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the RCRA Unit with the coordinates listed showing the use restricted area.

  1. Annual report of 1991 groundwater monitoring data for the Kerr Hollow Quarry and Chestnut Ridge Sediment Disposal Basin at the Y-12 Plant: Reporting and statistical evaluation of the subsequent year (sixth) data

    International Nuclear Information System (INIS)

    McMahon, L.W.; Mercier, T.M.

    1992-02-01

    This annual report has historically been prepared to meet the annual reporting requirements of the Tennessee Department of and Environment and Conservation (TDEC), Hazardous Waste Management Regulation 1200-1-11-.05 (6)(e), for detection monitoring data collected on Resource Conservation and Recovery Act (RCRA) wells in place around facilities which are accorded interim status. The regulatory authority for these units at the Y-12 Plant is currently in transition. A Federal Facility Agreement (FFA) with an effective date of January 1, 1992, has been negotiated with the Department of Energy (DOE) for the Oak Ridge Reservation. This agreement provides a framework for remediation of the Oak Ridge Reservation so that both RCRA and CERCLA requirements are integrated into the remediation process and provides for State, EPA, and DOE to proceed with CERCLA as the lead regulatory requirement and RCRA as an applicable or relevant and appropriate requirement. This report is presented for the RCRA certified wells for two interim status units at the Y-12 Plant. These units are Kerr Hollow Quarry and Chestnut Ridge Sediment Disposal Basin. Kerr Hollow is currently undergoing clean closure under RCRA. The Chestnut Ridge Sediment Disposal Basin (CRSDB) was closed in 1989 under a TDEC approved RCRA closure plan. The relevance of a RCRA Post-Closure Permit to either of these units is a matter of contention between DOE and TDEC since the FFA does not contemplate post-closure permits

  2. 75 FR 81187 - South Dakota: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2010-12-27

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed Rule. SUMMARY: The Solid Waste Disposal Act, as amended, commonly... Agency (EPA) to authorize states to operate their hazardous waste management programs in lieu of the...

  3. Progress of the United States foreign research reactor spent nuclear fuel acceptance program

    International Nuclear Information System (INIS)

    Huizenga, D.G.; Clapper, M.; Thrower, A.W.

    2002-01-01

    The United States Department of Energy (DOE), in consultation with the Department of State (DOS), adopted the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel in May 1996. To date, the Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program has completed 23 shipments. Almost 5000 spent fuel assemblies from eligible research reactors throughout the world have been accepted into the United States under this program. Over the past year, another cross-country shipment of fuel was accomplished, as well as two additional shipments in the fourth quarter of calendar year 2001. These shipments attracted considerable safeguards oversight since they occurred post September 11. Recent guidance from the Nuclear Regulatory Commission (NRC) pertaining to security and safeguards issues deals directly with the transport of nuclear material. Since the Acceptance Program has consistently applied above regulatory safety enhancements in transport of spent nuclear fuel, this guidance did not adversely effect the Program. As the Program draws closer to its termination date, an increased number of requests for program extension are received. Currently, there are no plans to extend the policy beyond its current expiration date; therefore, eligible reactor operators interested in participating in this program are strongly encouraged to evaluate their inventory and plan for future shipments as soon as possible. (author)

  4. Honoring our donors: a survey of memorial ceremonies in United States anatomy programs.

    Science.gov (United States)

    Jones, Trahern W; Lachman, Nirusha; Pawlina, Wojciech

    2014-01-01

    Many anatomy programs that incorporate dissection of donated human bodies hold memorial ceremonies of gratitude towards body donors. The content of these ceremonies may include learners' reflections on mortality, respect, altruism, and personal growth told through various humanities modalities. The task of planning is usually student- and faculty-led with participation from other health care students. Objective information on current memorial ceremonies for body donors in anatomy programs in the United States appears to be lacking. The number of programs in the United States that currently plan these memorial ceremonies and information on trends in programs undertaking such ceremonies remain unknown. Gross anatomy program directors throughout the United States were contacted and asked to respond to a voluntary questionnaire on memorial ceremonies held at their institution. The results (response rate 68.2%) indicated that a majority of human anatomy programs (95.5%) hold memorial ceremonies. These ceremonies are, for the most part, student-driven and nondenominational or secular in nature. Participants heavily rely upon speech, music, poetry, and written essays, with a small inclusion of other humanities modalities, such as dance or visual art, to explore a variety of themes during these ceremonies. © 2013 American Association of Anatomists.

  5. The Mississippi State University College of Veterinary Medicine Shelter Program

    Science.gov (United States)

    Bushby, Philip; Woodruff, Kimberly; Shivley, Jake

    2015-01-01

    Simple Summary First initiated in 1995 to provide veterinary students with spay/neuter experience, the shelter program at the Mississippi State University College of Veterinary Medicine has grown to be comprehensive in nature incorporating spay/neuter, basic wellness care, diagnostics, medical management, disease control, shelter management and biosecurity. Junior veterinary students spend five days in shelters; senior veterinary students spend 2-weeks visiting shelters in mobile veterinary units. The program has three primary components: spay/neuter, shelter medical days and Animals in Focus. Student gain significant hands-on experience and evaluations of the program by students are overwhelmingly positive. Abstract The shelter program at the Mississippi State University College of Veterinary Medicine provides veterinary students with extensive experience in shelter animal care including spay/neuter, basic wellness care, diagnostics, medical management, disease control, shelter management and biosecurity. Students spend five days at shelters in the junior year of the curriculum and two weeks working on mobile veterinary units in their senior year. The program helps meet accreditation standards of the American Veterinary Medical Association’s Council on Education that require students to have hands-on experience and is in keeping with recommendations from the North American Veterinary Medical Education Consortium. The program responds, in part, to the challenge from the Pew Study on Future Directions for Veterinary Medicine that argued that veterinary students do not graduate with the level of knowledge and skills that is commensurate with the number of years of professional education. PMID:26479234

  6. Structure and management of tuberculosis control programs in fragile states--Afghanistan, DR Congo, Haiti, Somalia.

    Science.gov (United States)

    Mauch, Verena; Weil, Diana; Munim, Aayid; Boillot, Francois; Coninx, Rudi; Huseynova, Sevil; Powell, Clydette; Seita, Akihiro; Wembanyama, Henriette; van den Hof, Susan

    2010-07-01

    Health care delivery is particularly problematic in fragile states often connected with increased incidence of communicable diseases, among them tuberculosis. This article draws upon experiences in tuberculosis control in four fragile states from which four lessons learned were derived. A structured inventory to extract common themes specific for TB control in fragile states was conducted among twelve providers of technical assistance who have worked in fragile states. The themes were applied to the TB control programs of Afghanistan, DR Congo, Haiti and Somalia during the years 2000-2006. Case notifications and treatment outcomes have increased in all four countries since 2003 (treatment success rates 81-90%). Access to care and case detection however have remained insufficient (case detection rates 39-62%); There are four lessons learned: 1. TB control programs can function in fragile states. 2. National program leadership and stewardship are essential for quality and sustained TB control. 3. Partnerships with non-governmental providers are vital for continuous service delivery; 4. TB control programs in fragile states require consistent donor support. Despite challenges in management, coordination, security, logistics and funding, TB control programs can function in fragile states, but face considerable problems in access to diagnosis and treatment and therefore case detection. Copyright (c) 2010 Elsevier Ireland Ltd. All rights reserved.

  7. Regulatory controls on the hydrogeological characterization of a mixed waste disposal site, Radioactive Waste Management Complex, Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Ruebelmann, K.L.

    1990-01-01

    Following the detection of chlorinated volatile organic compounds in the groundwater beneath the SDA in the summer of 1987, hydrogeological characterization of the Radioactive Waste Management Complex (RWMC), Idaho National Engineering Laboratory (INEL) was required by the Resource Conservation and Recovery Act (RCRA). The waste site, the Subsurface Disposal Area (SDA), is the subject of a RCRA Corrective Action Program. Regulatory requirements for the Corrective Action Program dictate a phased approach to evaluation of the SDA. In the first phase of the program, the SDA is the subject of a RCRA Facility Investigation (RIF), which will obtain information to fully characterize the physical properties of the site, determine the nature and extent of contamination, and identify pathways for migration of contaminants. If the need for corrective measures is identified during the RIF, a Corrective Measures Study (CMS) will be performed as second phase. Information generated during the RIF will be used to aid in the selection and implementation of appropriate corrective measures to correct the release. Following the CMS, the final phase is the implementation of the selected corrective measures. 4 refs., 1 fig

  8. An Assessment of Research-Doctorate Programs in the United States: Engineering.

    Science.gov (United States)

    Jones, Lyle V., Ed.; And Others

    The quality of doctoral-level chemical engineering (N=79), civil engineering (N=74), electrical engineering (N=91), and mechanical engineering (N=82) programs at United States universities was assessed, using 16 measures. These measures focused on variables related to: (1) program size; (2) characteristics of graduates; (3) reputational factors…

  9. United states technical and social programs for Chornobyl and Slavutych

    International Nuclear Information System (INIS)

    Terner, D.

    2002-01-01

    Major United States initiatives for Chornobyl and Slavutych: Slavutych division of the International Chornobyl Center; international radioecology laboratory; nuclear, fire and workers safety upgrade at Chornobyl nuclear power plant; Chornobyl closure; Ukraine off-site training and emergency center; Slavutych-Richland community partnership program; employment transition services and economic development; Slavutych energy efficiency program; Slavutych business incubator; Chornobyl management interactions with hanford site; humanitarian assistance for Slavutych

  10. 77 FR 15273 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2012-03-15

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... hazardous waste management program. We authorized the following revisions: Oklahoma received authorization... its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management Act...

  11. State geothermal commercialization programs in ten Rocky Mountain states. Semi-annual progress report, July-December 1979

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, J.L. (comp.)

    1980-08-01

    The activities and findings of the ten state teams participating in the Rocky Mountain Basin and Range Regional Hydrothermal Commercialization Program for the period are described. A summary of the state projects, compilation of project accomplishments, summary of findings, and a description of the major conclusions and recommendations are presented. Also included are chapters on the commercialization activities carried out by individual teams in each state: Arizona, Colorado, Idaho, Montana, Nevada, New-Mexico, North Dakota, South Dakota, Utah, and Wyoming. (MHR)

  12. Healthy Families America state systems development: an emerging practice to ensure program growth and sustainability.

    Science.gov (United States)

    Friedman, Lori; Schreiber, Lisa

    2007-01-01

    In an era of fiscal constraints and increased accountability for social service programs, having a centralized and efficient infrastructure is critical. A well-functioning infrastructure helps a state reduce duplication of services, creates economies of scale, coordinates resources, supports high-quality site development and promotes the self-sufficiency and growth of community-based programs. Throughout the Healthy Families America home visitation network, both program growth and contraction have been managed by in-state collaborations, referred to as "state systems." This article explores the research base that supports the rationale for implementing state systems, describes the evolution of state systems for Healthy Families America, and discusses the benefits, challenges and lessons learned of utilizing a systems approach.

  13. Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Documentation

    International Nuclear Information System (INIS)

    PLACE, B.G.

    2000-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention/Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 2000) and Prime Contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994) and Department of Energy Acquisition Regulations (DEAR) (48 CFR 970.5204-2 and 48 CFR 970.5204-78). Documentation guidance for the following five P2/WMin elements is discussed: Fiscal Year (FY) Goals; Budget and Staffing; Pollution Prevention (P2) Reporting; WMin Certification; and Waste Minimization (WMin) Assessments (WMAs)

  14. Professional Development: Are We Meeting the Needs of State EHDI Programs?

    Science.gov (United States)

    Houston, K. Todd; Munoz, Karen F.; Bradham, Tamala S.

    2011-01-01

    State coordinators of early hearing detection and intervention (EHDI) programs completed a strengths, weaknesses, opportunities, and threats, or SWOT, analysis that consisted of 12 evaluative areas of EHDI programs. For the professional development area, 47 coordinators responded with a total of 223 items, and themes were identified in each SWOT…

  15. 76 FR 37021 - Louisiana: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2011-06-24

    ...: Final Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental... implement its base Hazardous Waste Management Program. We granted authorization for changes to their program... opportunity to apply for final authorization to operate all aspects of their hazardous waste management...

  16. 34 CFR 692.30 - How does a State administer its community service-learning job program?

    Science.gov (United States)

    2010-07-01

    ...-learning job program? 692.30 Section 692.30 Education Regulations of the Offices of the Department of... Administer Its Community Service-Learning Job Program? § 692.30 How does a State administer its community service-learning job program? (a)(1) Each year, a State may use up to 20 percent of its allotment for a...

  17. Metaevaluation of National Weatherization Assistance Program Based on State Studies, 1993-2002

    Energy Technology Data Exchange (ETDEWEB)

    Berry, L

    2003-04-02

    The National Weatherization Assistance Program, sponsored by the U.S. Department of Energy (DOE) and implemented by state and local agencies throughout the United States, weatherizes homes for low-income residents in order to increase their energy efficiency and lower utility bills. Research staff members at Oak Ridge National Laboratory (ORNL) have performed two previous metaevaluations of this program (Berry, 1997; Schweitzer and Berry, 1999). Both of these earlier metaevaluations involved synthesizing the results from individual studies of state weatherization efforts completed during a several year period. This report is the third in a series of metaevaluations of state-level studies. It is built on the foundation developed by the previous two metaevaluations. The purpose of this report, like that of the two earlier ORNL metaevaluations, is to provide a current estimate of the average national energy savings per home weatherized for the Weatherization Assistance Program based on the relevant state-level studies. All three of the metaevaluations, including this one, were designed to be updates to the findings of a national evaluation of the Weatherization Assistance Program, which examined a representative national sample of several thousand structures weatherized in 1989 (Brown, Berry, Balzer, and Faby 1993). Although the first and second metaevaluations used separate sets of state-level studies, completed during different time periods, there was little difference in their findings about the typical national energy savings per weatherized home for homes that heat with natural gas. Our initial analysis efforts for this report involved repeating the same procedures that had been used in the previous two reports. In particular, we collected and examined only the state-level evaluations that had become available between September of 1998 and August of 2002. Once again, we found little difference in the average energy savings estimates per weatherized home that were

  18. 78 FR 32161 - Oklahoma: Final Authorization of State Hazardous Waste Management Program Revision

    Science.gov (United States)

    2013-05-29

    ... Authorization of State Hazardous Waste Management Program Revision AGENCY: Environmental Protection Agency (EPA... waste management program. We authorized the following revisions: Oklahoma received authorization for... authorization of its program revision in accordance with 40 CFR 271.21. The Oklahoma Hazardous Waste Management...

  19. 32 CFR 644.318 - Compliance with State Coastal Zone Management Programs.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Compliance with State Coastal Zone Management... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Disposal § 644.318 Compliance with State Coastal Zone Management Programs. Subpart H will outline the provisions of the Coastal Zone Management Act of 1972, as...

  20. Final report to DOE: Matching Grant Program for the Penn State University Nuclear Engineering Program

    International Nuclear Information System (INIS)

    Jack S. Brenizer, Jr.

    2003-01-01

    The DOE/Industry Matching Grant Program is designed to encourage collaborative support for nuclear engineering education as well as research between the nation's nuclear industry and the U.S. Department of Energy (DOE). Despite a serious decline in student enrollments in the 1980s and 1990s, the discipline of nuclear engineering remained important to the advancement of the mission goals of DOE. The program is designed to ensure that academic programs in nuclear engineering are maintained and enhanced in universities throughout the U.S. At Penn State, the Matching Grant Program played a critical role in the survival of the Nuclear Engineering degree programs. Funds were used in a variety of ways to support both undergraduate and graduate students directly. Some of these included providing seed funding for new graduate research initiatives, funding the development of new course materials, supporting new teaching facilities, maintenance and purchase of teaching laboratory equipment, and providing undergraduate scholarships, graduate fellowships, and wage payroll positions for students

  1. 78 FR 12349 - Proposed Information Collection; Land and Water Conservation Fund State Assistance Program

    Science.gov (United States)

    2013-02-22

    ...] Proposed Information Collection; Land and Water Conservation Fund State Assistance Program AGENCY: National.... Abstract The Land and Water Conservation Fund Act of 1965 (LWCF Act) (16 U.S.C. 460l-4 et seq.) was enacted... discussed in detail in the Land and Water Conservation Fund State Assistance Program Federal Financial...

  2. Boise State's Idaho Eclipse Outreach Program

    Science.gov (United States)

    Davis, Karan; Jackson, Brian

    2017-10-01

    The 2017 total solar eclipse is an unprecedented opportunity for astronomical education throughout the continental United States. With the path of totality passing through 14 states, from Oregon to South Carolina, the United States is expecting visitors from all around the world. Due to the likelihood of clear skies, Idaho was a popular destination for eclipse-chasers. In spite of considerable enthusiasm and interest by the general population, the resources for STEM outreach in the rural Pacific Northwest are very limited. In order to help prepare Idaho for the eclipse, we put together a crowdfunding campaign through the university and raised over $10,000. Donors received eclipse shades as well as information about the eclipse specific to Idaho. Idaho expects 500,000 visitors, which could present a problem for the many small, rural towns scattered across the path of totality. In order to help prepare and equip the public for the solar eclipse, we conducted a series of site visits to towns in and near the path of totality throughout Idaho. To maximize the impact of this effort, the program included several partnerships with local educational and community organizations and a focus on the sizable refugee and low-income populations in Idaho, with considerable attendance at most events.

  3. Devolution's policy impact on non-emergency medical transportation in State Children's Health Insurance Programs.

    Science.gov (United States)

    Borders, Stephen; Blakely, Craig; Ponder, Linda; Raphael, David

    2011-01-01

    Proponents of devolution often maintain that the transfer of power and authority of programs enables local officials to craft policy solutions that better align with the needs of their constituents. This article provides one of the first empirical evaluations of this assumption as it relates to non-emergency medical transportation (NEMT) in the State Children's Health Insurance Program (SCHIP). NEMT programs meet a critical need in the areas in which they serve, directly targeting this single key access barrier to care. Yet states have great latitude in making such services available. The authors utilize data from 32 states to provide a preliminary assessment of devolution's consequences and policy impact on transportation-related access to care. Their findings provide mixed evidence on devolution's impact on policy outcomes. Proponents of devolution can find solace in the fact that several states have gone beyond federally mandated minimum requirements to offer innovative programs to remove transportation barriers to care. Detractors of devolution will find continued pause on several key issues, as a number of states do not offer NEMT to their SCHIP populations while cutting services and leaving over $7 billion in federal matching funding unspent.

  4. United States policy initiatives in promoting the RERTR program

    International Nuclear Information System (INIS)

    Huizenga, David G.

    1996-01-01

    The Reduced Enrichment for Research and Test Reactors (RERTR) program has been successful in furthering efforts to reduce and eventually eliminate highly enriched uranium (HEU) from international commerce. Three key policy initiatives are underway to further promote the RERTR program. The first initiative is implementation of a new nuclear weapons nonproliferation policy concerning foreign research reactor spent nuclear fuel. Under this policy, the United States will accept over the next 13 years research reactor spent fuel from 41 countries that have converted or plan to convert to use LEU fuels. The second initiative is to pursue cooperative efforts to expand the RERTR program to new regions of the globe, including Russia and China. The third initiative is to restart the advanced LEU fuels development program at the Argonne National Laboratory in order to increase the number of reactors that can convert to use LEU without significant detriment to their performance

  5. Impact of 2001 Building Technology, state and community programs on United States employment and wage income

    International Nuclear Information System (INIS)

    MJ Scott; DJ Hostick; DB Elliott

    2000-01-01

    The Department of Energy Office of Building Technology, State and Community Programs (BTS) is interested in assessing the potential economic impacts of its portfolio of programs on national employment and income. A special purpose version of the IMPLAN input-output model allied In Build is used in this study of all 38 BTS programs included in the FY2001 federal budget. Energy savings, investments, and impacts on U.S. national employment and wage income are reported by program for selected years to the year 2030. Energy savings from these programs have the potential of creating a total of nearly 332,000 jobs and about $5.3 billion in wage income (1995$) by the year 2030. Because the required investments to achieve these savings are capital intensive, the net effect after investment is 304,000 jobs and $5.0 billion

  6. Comparing the Medicaid Retrospective Drug Utilization Review Program Cost-Savings Methods Used by State Agencies.

    Science.gov (United States)

    Prada, Sergio I

    2017-12-01

    The Medicaid Drug Utilization Review (DUR) program is a 2-phase process conducted by Medicaid state agencies. The first phase is a prospective DUR and involves electronically monitoring prescription drug claims to identify prescription-related problems, such as therapeutic duplication, contraindications, incorrect dosage, or duration of treatment. The second phase is a retrospective DUR and involves ongoing and periodic examinations of claims data to identify patterns of fraud, abuse, underutilization, drug-drug interaction, or medically unnecessary care, implementing corrective actions when needed. The Centers for Medicare & Medicaid Services requires each state to measure prescription drug cost-savings generated from its DUR programs on an annual basis, but it provides no guidance or unified methodology for doing so. To describe and synthesize the methodologies used by states to measure cost-savings using their Medicaid retrospective DUR program in federal fiscal years 2014 and 2015. For each state, the cost-savings methodologies included in the Medicaid DUR 2014 and 2015 reports were downloaded from Medicaid's website. The reports were then reviewed and synthesized. Methods described by the states were classified according to research designs often described in evaluation textbooks. In 2014, the most often used prescription drugs cost-savings estimation methodology for the Medicaid retrospective DUR program was a simple pre-post intervention method, without a comparison group (ie, 12 states). In 2015, the most common methodology used was a pre-post intervention method, with a comparison group (ie, 14 states). Comparisons of savings attributed to the program among states are still unreliable, because of a lack of a common methodology available for measuring cost-savings. There is great variation among states in the methods used to measure prescription drug utilization cost-savings. This analysis suggests that there is still room for improvement in terms of

  7. Representational State Transfer a its support in programming language Java

    OpenAIRE

    Tran, Dac Ngoc Lam

    2010-01-01

    This bachelor thesis focuses on explaining the term Representational State Transfer (REST) and its usage in the programming language Java. The first chapter introduces readers with the theoretical basis of REST, its presence in HTTP protocol and its pros and cons in general. The second chapter is dedicated to the application of principles mentioned in the first chapter. On two different programs, a client and a server, I go through the analysis and programming the REST layer. After this chapt...

  8. The State of Knowledge of Outdoor Orientation Programs: Current Practices, Research, and Theory

    Science.gov (United States)

    Bell, Brent J.; Gass, Michael A.; Nafziger, Christopher S.; Starbuck, J. David

    2014-01-01

    Outdoor orientation programs represent a prominent area of experiential education with over 25,000 participants annually. More than 191 outdoor orientation programs currently operate in the United States and Canada. The research examining outdoor orientation programs consists of 25 peer-reviewed published studies and 11 dissertations. A new theory…

  9. Reforestation program of the Energy Company of Minas Gerais State, Brazil (CEMIG)

    International Nuclear Information System (INIS)

    Fonseca, Enio Marcos Brandao; Rezende, Antonio Procopio Sampaio; Prado, Newton Jose Schmidt; Silva, Luiz Carlos da; Castro, Pedro Mendes

    1993-01-01

    The forestation program carried out by the Energy Company of Minas Gerais State (CEMIG) utility and its dam's sites is described. This program was started in 1989 and aims at implanting 12.478 ha within a period of 10 years. 1 ref., 5 tabs

  10. Report of the State Auditor. State Colleges in Colorado. Financial, State-Funded Student Financial Assistance Programs, and NCAA Audits. Fiscal Year Ended June 30, 1995.

    Science.gov (United States)

    Barba, J. David

    The results of a Colorado State audit of the consolidated financial statements are reported, along with the statements of appropriations, expenditures, transfers and reversions for state-funded Student Financial Assistance Programs for the four State Colleges in Colorado for the year ended June 30, 1995. Specific recommendations are given for each…

  11. 78 FR 50118 - Policy Statement on Adequacy and Compatibility of Agreement State Programs; Statement of...

    Science.gov (United States)

    2013-08-16

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0081] Policy Statement on Adequacy and Compatibility of Agreement State Programs; Statement of Principles and Policy for the Agreement State Program AGENCY: Nuclear Regulatory Commission. ACTION: Policy statements; extension of comment period. SUMMARY: The U.S. Nuclear...

  12. Development of Virtual Environment under Member State Support Program

    International Nuclear Information System (INIS)

    Koh, Byungmarn; Lee, Nayoung

    2013-01-01

    Member State Support Program (MSSP) is comprised of various programs such as development of safeguards approach, training, information analysis and so on. Each support programs would be evaluated biennially through coordinators' meeting. IAEA publish 'Development and Implementation Support Programme for Nuclear Verification' so that the member state can review it. In the program, IAEA specify the need to develop the virtual reality based training tools. The objective of this project is to develop comprehensive training software dedicated to verification activities in the field based on the virtual environment. The training for the IAEA inspector is indispensable to maintain or improve their verification capability and to be prepared for the inspection of the complicated facilities. However, the grabbing of the available facility is not easy due to following limitations such as security, confidentiality, interference of the commercial operation and so on. Therefore, the virtual environment, which can replace a real facility, is required for the IAEA training. The objective of this software is to support the IAEA's verification capability. It is useful for the trainer and trainee to better understand how nuclear materials are processed in the fuel fabrication facility and what kind safeguards approaches are needed at each process before inspections. The final product will be integrated in the IAEA safeguards training courses to improve the efficiency of the safeguards training. Also we are going to make a decision if additional projects such as CANDU fuel parts or other facilities depending on evaluation results at the IAEA training course will be held on Korea in this year

  13. Development of Virtual Environment under Member State Support Program

    Energy Technology Data Exchange (ETDEWEB)

    Koh, Byungmarn; Lee, Nayoung [Korea Institute of Nuclear Non-proliferation and Control, Daejeon (Korea, Republic of)

    2013-05-15

    Member State Support Program (MSSP) is comprised of various programs such as development of safeguards approach, training, information analysis and so on. Each support programs would be evaluated biennially through coordinators' meeting. IAEA publish 'Development and Implementation Support Programme for Nuclear Verification' so that the member state can review it. In the program, IAEA specify the need to develop the virtual reality based training tools. The objective of this project is to develop comprehensive training software dedicated to verification activities in the field based on the virtual environment. The training for the IAEA inspector is indispensable to maintain or improve their verification capability and to be prepared for the inspection of the complicated facilities. However, the grabbing of the available facility is not easy due to following limitations such as security, confidentiality, interference of the commercial operation and so on. Therefore, the virtual environment, which can replace a real facility, is required for the IAEA training. The objective of this software is to support the IAEA's verification capability. It is useful for the trainer and trainee to better understand how nuclear materials are processed in the fuel fabrication facility and what kind safeguards approaches are needed at each process before inspections. The final product will be integrated in the IAEA safeguards training courses to improve the efficiency of the safeguards training. Also we are going to make a decision if additional projects such as CANDU fuel parts or other facilities depending on evaluation results at the IAEA training course will be held on Korea in this year.

  14. Pilot States Program report: Home energy ratings systems and energy-efficient mortgages

    Energy Technology Data Exchange (ETDEWEB)

    Farhar, B.

    2000-04-04

    This report covers the accomplishments of the home energy ratings systems/energy-efficient mortgages (HERS/EEMs) pilot states from 1993 through 1998, including such indicators as funding, ratings and EEMs achieved, active raters, and training and marketing activities. A brief description of each HERS program's evolution is included, as well as their directors' views of the programs' future prospects. Finally, an analysis is provided of successful HERS program characteristics and factors that appear to contribute to HERS program success.

  15. Development of guidance for preparing treatability variance petitions from the RCRA Land Disposal Restrictions for DOE [Department of Energy] mixed-waste streams

    International Nuclear Information System (INIS)

    Harms, T.; Scheuer, N.; Martin, R.; Van Epp, T.; Triplett, M.

    1990-01-01

    In response to the Department of Energy's (DOE) anticipated need for variances from the Resource Conservation and Recovery Act (RCRA) Land Disposal Restriction (LDR) treatment requirements, a treatability variance guidance document is being prepared for use by DOE facilities and operations offices. The guidance document, although applicable to non-mixed hazardous waste streams, provides specific guidance regarding radioactive mixed-waste streams. Preparation of the guidance manual has involved developing an overview of the Land Disposal Restrictions, as well as an overview of the petition preparation process. The DOE internal review requirements are specifically addressed in the manual. Specific data requirements and engineering analyses are also described. A discussion of EPA's criteria for granting a treatability variance is also provided. A checklist for completeness of the petition is provided. Model language for use in DOE treatability variance petitions will be provided in a petition for a DOE waste stream as an appendix to the document

  16. The Centers for Disease Control program to prevent primary and secondary disabilities in the United States.

    OpenAIRE

    Houk, V N; Thacker, S B

    1989-01-01

    The Disabilities Prevention Program builds on traditional Centers for Disease Control (CDC) strengths in public health surveillance, epidemiology, and technology transfer to State and local governments in translating the findings of research into prevention programs. The objectives of the CDC program are to provide a national focus for the prevention of primary and secondary disabilities, build capacity at the State and community levels to maintain programs to prevent disabilities, and increa...

  17. FY11_EOM_August_Number of Life Insurance Policies by Program by State

    Data.gov (United States)

    Department of Veterans Affairs — Number of life insurance policies for each administered life insurance program listed by state. Data is current as of 08/31/11. All programs are closed to new issues...

  18. Reimbursement rates and policies for primary molar pit-and-fissure sealants across state Medicaid programs.

    Science.gov (United States)

    Chi, Donald L; Singh, Jennifer

    2013-11-01

    Little is known about Medicaid policies regarding reimbursement for placement of sealants on primary molars. The authors identified Medicaid programs that reimbursed dentists for placing primary molar sealants and hypothesized that these programs had higher reimbursement rates than did state programs that did not reimburse for primary molar sealants. The authors obtained Medicaid reimbursement data from online fee schedules and determined whether each state Medicaid program reimbursed for primary molar sealants (no or yes). The outcome measure was the reimbursement rate for permanent tooth sealants (calculated in 2012 U.S. dollars). The authors compared mean reimbursement rates by using the t test (α = .05). Seventeen Medicaid programs reimbursed dentists for placing primary molar sealants (34 percent), and the mean reimbursement rate was $27.57 (range, $16.00 [Maine] to $49.68 [Alaska]). All 50 programs reimbursed dentists for placement of sealants on permanent teeth. The mean reimbursement for permanent tooth sealants was significantly higher in programs that reimbursed for primary molar sealants than in programs that did not ($28.51 and $23.67, respectively; P = .03). Most state Medicaid programs do not reimburse dentists for placing sealants on primary molars, but programs that do so have significantly higher reimbursement rates. Medicaid reimbursement rates are related to dentists' participation in Medicaid and children's dental care use. Reimbursement for placement of sealants on primary molars is a proxy for Medicaid program generosity.

  19. Estimate of the area occupied by reforestation programs in Rio de Janeiro state

    Directory of Open Access Journals (Sweden)

    Hugo Barbosa Amorim

    2012-03-01

    Full Text Available This study was based on a preliminary survey and inventory of existing reforestation programs in Rio de Janeiro state, through geoprocessing techniques and collection of field data. The reforested area was found to occupy 18,426.96 ha, which amounts to 0.42% of the territory of the state. Much of reforestation programs consists of eucalyptus (98%, followed by pine plantations (0.8%, and the remainder is distributed among 10 other species. The Médio Paraíba region was found to contribute the most to the reforested area of the state (46.6%. The estimated volume of eucalyptus timber was nearly two million cubic meters. This study helped crystallize the ongoing perception among those militating in the forestry sector of Rio de Janeiro state that the planted area and stock of reforestation timber is still incipient in the state.

  20. Relationship between Training Programs being Offered in State and Federal Penal Institutions and the Unfilled Job Openings in the Major Occupations in the United States.

    Science.gov (United States)

    Torrence, John Thomas

    Excluding military installations, training programs in state and federal penal institutions were surveyed, through a mailed checklist, to test the hypotheses that (1) training programs in penal institutions were not related to the unfilled job openings by major occupations in the United States, and (2) that training programs reported would have a…

  1. The REU Program in Solar Physics at Montana State University

    Science.gov (United States)

    Martens, Petrus C.; Canfield, R. C.; McKenzie, D. M.

    2007-05-01

    The Solar Physics group at Montana State University has organized an annual summer REU program in Solar Physics, Astronomy, and Space Physics since 1999, with NSF funding since 2003. The number of students applying and being admitted to the program has increased every year, and we have been very successful in attracting female participants. A great majority of our REU alumni have chosen career paths in the sciences, and, according to their testimonies, our REU program has played a significant role in their decisions. From the start our REU program has had an important international component through a close collaboration with the University of St. Andrews in Scotland. In our poster we will describe the goals, organization, scientific contents, international aspects, and results, and present statistics on applications, participants, gender balance, and diversity.

  2. Related Rules and Programs that Help States Attain PM Standards

    Science.gov (United States)

    EPA’s national and regional rules to reduce emissions of pollutants that form particle pollution will help state and local governments meet the PM NAAQS. A number of voluntary programs also are helping areas reduce fine PM pollution.

  3. Characterizing the Breadth and Depth of Volunteer Water Monitoring Programs in the United States

    Science.gov (United States)

    Stepenuck, Kristine F.; Genskow, Kenneth D.

    2018-01-01

    A survey of 345 volunteer water monitoring programs in the United States was conducted to document their characteristics, and perceived level of support for data to inform natural resource management or policy decisions. The response rate of 86% provided information from 46 states. Programs represented a range of ages, budgets, objectives, scopes, and level of quality assurance, which influenced data uses and perceived support by sponsoring agency administrators and external decision makers. Most programs focused on rivers, streams, and lakes. Programs had not made substantial progress to develop EPA or state-approved quality assurance plans since 1998, with only 48% reporting such plans. Program coordinators reported feeling slightly more support for data to be used for management as compared to policy decisions. Programs with smaller budgets may be at particular risk of being perceived to lack credibility due to failure to develop quality assurance plans. Over half of programs identified as collaborative, in that volunteers assisted scientists in program design, data analysis and/or dissemination of results. Just under a third were contributory, in which volunteers primarily collected data in a scientist-defined program. Recommendations to improve perceived data credibility, and to augment limited budgets include developing quality assurance plans and gaining agency approval, and developing partnerships with other organizations conducting monitoring in the area to share resources and knowledge. Funding agencies should support development of quality assurance plans to help ensure data credibility. Service providers can aid in plan development by providing training to program staff over time to address high staff turnover rates.

  4. An overview of Compassionate Use Programs in the European Union member states.

    Science.gov (United States)

    Balasubramanian, Gayathri; Morampudi, Suman; Chhabra, Pankdeep; Gowda, Arun; Zomorodi, Behsad

    2016-11-01

    The past decade witnessed rapid development of novel drugs and therapeutic biological agents. The marketing authorization for novel therapies is often time consuming and distressing for patients. Earlier clinical trials were the only way to access new drugs under development. However, not every patient meets the enrolment criteria, and participation is difficult for patients with life-threatening, long-lasting or seriously debilitating diseases like rare diseases. Early access programs like "Compassionate Use Program (CUP)" have generated alternative channels for such patients. The European Medical Agency provides regulations and recommendations for compassionate use, upon which every European Union (EU) member state has developed its own rules and regulations. Despite previous reviews and studies, the available information is limited and gaps exist. This literature review explores CUP in 28 EU member states. Data was collected through literature review and use of country-specific search terms from the healthcare domain. Data sources were not limited to databases and articles published in journals, but also included grey literature. The results implied that CUP was present in 20 EU member states (71%). Of 28 EU states, 18 (∼64%) had nationalized regulations and processes were well-defined. Overall, this review identified CUP and its current status and legislation in 28 EU member states. The established legislation for CUP in the EU member states suggest their willingness to adopt processes that facilitate earlier and better access to new medicines. Further research and periodic reviews are warranted to understand the contemporary and future regulatory trends in early access programs.

  5. Disposal phase experimental program plan

    International Nuclear Information System (INIS)

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) facility comprises surface and subsurface facilities, including a repository mined in a bedded salt formation at a depth of 2,150 feet. It has been developed to safely and permanently isolate transuranic (TRU) radioactive wastes in a deep geological disposal site. On April 12, 1996, the DOE submitted a revised Resource Conservation and Recovery Act (RCRA) Part B permit application to the New Mexico Environment Department (NMED). The DOE anticipates receiving an operating permit from the NMED; this permit is required prior to the start of disposal operations. On October 29, 1996, the DOE submitted a Compliance Certification Application (CCA) to the US Environmental Protection Agency (EPA) in accordance with the WIPP land Withdrawal Act (LWA) of 1992 (Public Law 102-579) as amended, and the requirements of Title 40 of the Code of Federal Regulations (40 CFR) Parts 191 and 194. The DOE plans to begin disposal operations at the WIPP in November 1997 following receipt of certification by the EPA. The disposal phase is expected to last for 35 years, and will include recertification activities no less than once every five years. This Disposal Phase Experimental Program (DPEP) Plan outlines the experimental program to be conducted during the first 5-year recertification period. It also forms the basis for longer-term activities to be carried out throughout the 35-year disposal phase. Once the WIPP has been shown to be in compliance with regulatory requirements, the disposal phase gives an opportunity to affirm the compliance status of the WIPP, enhance the operations of the WIPP and the national TRU system, and contribute to the resolution of national and international nuclear waste management technical needs. The WIPP is the first facility of its kind in the world. As such, it provides a unique opportunity to advance the technical state of the art for permanent disposal of long-lived radioactive wastes

  6. 76 FR 26681 - Wisconsin: Incorporation by Reference of Approved State Hazardous Waste Management Program

    Science.gov (United States)

    2011-05-09

    ... of Approved State Hazardous Waste Management Program AGENCY: Environmental Protection Agency (EPA... Hazardous Waste Management Programs,'' Wisconsin's authorized hazardous waste program. EPA will incorporate... that are authorized and that the EPA will enforce under the Solid Waste Disposal Act, commonly referred...

  7. State-Funded "Eminent Scholars" Programs: University Faculty Recruitment as an Emerging Policy Instrument

    Science.gov (United States)

    Hearn, James C.; McLendon, Michael K.; Lacy, T. Austin

    2013-01-01

    Over the past two decades, state governments have increasingly invested in programs to recruit accomplished scientists from elsewhere to university positions. This event history analysis suggests that an intriguing mix of comparative state disadvantage and leveragable existing research resources is associated with the likelihood of states adopting…

  8. 1999 Annual Mixed Waste Management Facility Groundwater Correction - Action Report (Volumes I, II, and III)

    International Nuclear Information System (INIS)

    Chase, J.

    2000-01-01

    This Corrective Action Report (CAR) for the Mixed Waste Management Facility (MWMF) is being prepared to comply with the Resource Conservation and Recovery Act (RCRA) Permit Number SC1 890 008 989, dated October 31, 1999. This CAR compiles and presents all groundwater sampling and monitoring activities that are conducted at the MWMF. As set forth in previous agreements with South Carolina Department of Health and Environmental Control (SCDHEC), all groundwater associated with the Burial Ground Complex (BGC) (comprised of the MWMF, Low-Level Radioactive Waste Disposal Facility, and Old Radioactive Waste Burial Ground) will be addressed under this RCRA Permit. This CAR is the first to be written for the MWMF and presents monitoring activities and results as an outcome of Interim Status and limited Permitted Status activities. All 1999 groundwater monitoring activities were conducted while the MWMF was operated during Interim Status. Changes to the groundwater monitoring program were made upon receipt of the RCRA Permit, where feasible. During 1999, 152 single-screened and six multi-screened groundwater monitoring wells at the BGC monitored groundwater quality in the uppermost aquifer as required by the South Carolina Hazardous Waste Management Regulations (SCHWMR), settlement agreements 87-52-SW and 91-51-SW, and RCRA Permit SC1 890 008 989. However, overall compliance with the recently issued RCRA Permit could not be implemented until the year 2000 due to the effective date of the RCRA Permit and scheduling of groundwater monitoring activities. Changes have been made to the groundwater monitoring network to meet Permit requirements for all 2000 sampling events

  9. State program on scientific support of nuclear power development in Belarus

    International Nuclear Information System (INIS)

    Mikhalevich, A.

    2010-01-01

    Following the decision on NPP construction in Belarus, the Organization on Technical and Scientific Support of Nuclear Power Development (Joint Institute of Power and Nuclear Research - 'Sosny') has been nominated. In 2009, the Government adopted the State Program on Scientific Support of Nuclear Power Development in the Republic of Belarus for period up to 2020. The paper reviews activities implemented within the framework of this Program. (author)

  10. The positive influence of state agricultural marketing programs on adults' fruit and vegetable consumption.

    Science.gov (United States)

    Howlett, Elizabeth A; Burton, Scot; Newman, Christopher L; Faupel, Michel A

    2012-01-01

    To assess whether state-sponsored agricultural marketing programs had a positive influence on adult consumers' fruit and vegetable consumption. Differences in fruit and vegetable consumption between 2000 and 2005 in states that initiated marketing campaigns during this period and those that did not were examined. A representative sample (n  =  237,320) of adults aged 18 and older from states with and without marketing programs was used. The study used data from the 2000 and 2005 Behavioral Risk Factor Surveillance System. The number of fruit and vegetable servings per week and the percentage of respondents consuming five or more servings of fruits and vegetables per day were examined. Between-subjects analysis of variance and logistic regression. In the absence of a marketing campaign, there was a significant decrease in fruit and vegetable consumption between 2000 and 2005. In states with campaigns, consumption remained stable or increased. Marketing effects were stronger for women than for men. Conclusions . State-sponsored agricultural marketing programs had favorable effects on consumers' consumption of fruits and vegetables.

  11. The Impacts of the Great Recession on State Natural Resource Extension Programs

    Science.gov (United States)

    Serenari, Christopher; Peterson, M. Nils; Bardon, Robert E.; Brown, Robert D.

    2013-01-01

    The Great Recession contributed to major budget cuts for natural resource Extension programs in the United States. Despite the potentially large cuts, their impacts and how Extension has adapted their programs have not been evaluated. We begin addressing these needs with surveys of Association of Natural Resource Extension Professionals members…

  12. Mapping goal alignment of deployment programs for alternative fuel technologies: An analysis of wide-scope grant programs in the United States

    International Nuclear Information System (INIS)

    Sobin, Nathaniel; Molenaar, Keith; Cahill, Eric

    2012-01-01

    Governments have attempted to advance alternative fuels (AFs) in the on-road transportation sector with the goal of addressing multiple environmental, energy security, economic growth, and technology transition objectives. However there is little agreement, at all governmental levels, on how to prioritize goals and how to measure progress towards goals. Literature suggests that a consistent, aligned, and prioritized approach will increase the effectiveness of deployment efforts. While literature states that goal alignment and prioritization should occur, there are few studies suggesting how to measure the alignment of deployment programs. This paper presents a methodology for measuring goal alignment by applying the theories of goal ambiguity. It then demonstrates this methodology within the context of fuel- and project-neutral (wide-scope) grant programs directed toward AF deployment. This paper analyzes forty-seven (47) wide-scope federal, state, and regional grant programs in the United States, active between 2006 and 2011. On the whole, governments most use deployment grant programs to address environmental concerns and are highly aligned in doing so between agency levels. In contrast, there is much less consensus (and therefore goal alignment) on whether or how governments should address other priorities such as energy security, economic growth, and technology transition. - Highlights: ► Grants that deploy AFs most often address environmental goals and are highly aligned in doing so. ► Economic growth goals are most often addressed by federal AF deployment grant programs. ► Energy security goals are most often addressed by state and regional AF deployment grant programs. ► Technology transition goals are the least aligned when considering alignment across agencies.

  13. Finding of no significant impact for the State Energy Conservation Program

    International Nuclear Information System (INIS)

    1996-01-01

    The Department of Energy (DOE) has prepared a Programmatic Environmental Assessment (PEA), DOE/EA 1068, to assess the environmental impacts associated with the State Energy Conservation Program (SECP). DOE previously funded SECP projects under the Energy Policy and Conservation Act of 1975 (EPCA). The State Energy Efficiency Programs Improvements Act of 1990 (SEEPIA) and the Energy Policy Act of 1992 (EPACT) amended EPCA to broaden the range of state initiatives qualifying for Federal assistance under the SECP. The PEA presents a general analysis of the potential environmental effects associated with broad types of projects that can be funded under the SECP. It does not analyze specific environmental effects or alternatives associated with individual energy conservation, energy efficiency, and renewable energy projects. Individual actions are to be evaluated in detail on a project-by-project basis to determine whether their impacts fall within the bounding analysis of the impacts analyzed in the SECP PEA

  14. A proposed methodology for performing risk analysis of state radiation control programs

    International Nuclear Information System (INIS)

    Dornsife, W.P.

    1996-01-01

    This paper is comprised of viewgraphs from a conference presentation. Topics discussed include barriers to effective risk assessment and management, and real versus perceived risk for various radiation programs in the state of Pennsylvania. Calculation results for Pennsylvania are provided for low-level radioactive waste transportation risks, indoor radon risk, and cancer morbidity risk from x-rays. A methodology for prioritizing radiation regulatory programs based on risk is presented with calculations for various Pennsylvania programs

  15. Availability of tobacco cessation services in substance use disorder treatment programs: Impact of state tobacco control policy.

    Science.gov (United States)

    Abraham, Amanda J; Bagwell-Adams, Grace; Jayawardhana, Jayani

    2017-08-01

    Given the high prevalence of smoking among substance use disorder (SUD) patients, the specialty SUD treatment system is an important target for adoption and implementation of tobacco cessation (TC) services. While research has addressed the impact of tobacco control on individual tobacco consumption, largely overlooked in the literature is the potential impact of state tobacco control policies on availability of services for tobacco cessation. This paper examines the association between state tobacco control policy and availability of TC services in SUD treatment programs in the United States. State tobacco control and state demographic data (n=51) were merged with treatment program data from the 2012 National Survey of Substance Abuse Treatment Services (n=10.413) to examine availability of TC screening, counseling and pharmacotherapy services in SUD treatment programs using multivariate logistic regression models clustered at the state-level. Approximately 60% of SUD treatment programs offered TC screening services, 41% offered TC counseling services and 26% offered TC pharmacotherapy services. Results of multivariate logistic regression showed the odds of offering TC services were greater for SUD treatment programs located in states with higher cigarette excise taxes and greater spending on tobacco prevention and control. Findings indicate cigarette excise taxes and recommended funding levels may be effective policy tools for increasing access to TC services in SUD treatment programs. Coupled with changes to insurance coverage for TC under the Affordable Care Act, state tobacco control policy tools may further reduce tobacco use in the United States. Published by Elsevier Ltd.

  16. Calendar year 1995 groundwater quality report for the Upper East Fork Poplar Creek Hydrogeologic Regime Y-12 Plant, Oak Ridge Tennessee. 1995 Groundwater quality data interpretations and proposed program modifications

    International Nuclear Information System (INIS)

    1996-08-01

    This groundwater quality report (GWQR) contains an evaluation of the groundwater quality data obtained during the 1995 calendar year (CY) at several waste management facilities associated with the US Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. These sites lie within the boundaries of the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), which is one of three hydrogeologic regimes defined for the purposes of groundwater quality monitoring at the Y-12 Plant. The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability (HSEA) Organization manages the groundwater monitoring activities in each regime under the auspices of the Y-12 Plant Groundwater Protection Program (GWPP). The purpose of the GWPP is to characterize the hydrogeology and to monitor groundwater quality at the Y-12 Plant and surrounding area to ensure protection of local groundwater resources in accordance with federal, state, and local regulations, DOE Orders, and Lockheed Martin Energy Systems, Inc. (Energy Systems) corporate policy. The annual GWQR for the East Fork Regime is completed in two parts. Part I consists primarily of data appendices and serves as a reference for the groundwater quality data obtained each CY under the lead of the Y-12 Plant GWPP. Because it contains information needed to comply with reporting requirements of Resource Conservation and Recovery Act (RCRA) interim status assessment monitoring, the Part I GWQR is submitted to the Tennessee Department of Environment and Conservation (TDEC) by the RCRA reporting deadline (March 1 of the following CY); Energy Systems submitted the 1995 Part I GWQR for the East Fork Regime to the TDEC in February 1996. Part 2 (this report) contains an evaluation of the data with respect to regime-wide groundwater quality

  17. Comparability between NQA-1 and the QA programs for analytical laboratories within the nuclear industry and EPA hazardous waste laboratories

    International Nuclear Information System (INIS)

    English, S.L.; Dahl, D.R.

    1989-01-01

    There is increasing cooperation between the Department of Energy (DOE), Department of Defense (DOD), and the Environmental Protection Agency (EPA) in the activities associated with monitoring and clean-up of hazardous wastes. Pacific Northwest Laboratory (PNL) examined the quality assurance/quality control programs that the EPA requires of the private sector when performing routine analyses of hazardous wastes to confirm how or if the requirements correspond with PNL's QA program based upon NQA-1. This paper presents the similarities and differences between NQA-1 and the QA program identified in ASTM-C1009-83, Establishing a QA Program for Analytical Chemistry Laboratories within the Nuclear Industry; EPA QAMS-005/80, Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans, which is referenced in Statements of Work for CERCLA analytical activities; and Chapter 1 of SW-846, which is used in analyses of RCRA samples. The EPA QA programs for hazardous waste analyses are easily encompassed within an already established NQA-1 QA program. A few new terms are introduced and there is an increased emphasis upon the QC/verification, but there are many of the same basic concepts in all the programs

  18. The Evolution of India's Nuclear Program: Implications for the United States

    National Research Council Canada - National Science Library

    Creasman, David J

    2008-01-01

    Since India began developing its nuclear program it has continually encountered issues with the United States and other nuclearized countries over whether India should be able to establish a nuclear...

  19. 77 FR 66577 - Fisheries Off West Coast States; Pacific Coast Groundfish Fishery; Trawl Rationalization Program...

    Science.gov (United States)

    2012-11-06

    ...-XC165 Fisheries Off West Coast States; Pacific Coast Groundfish Fishery; Trawl Rationalization Program... implemented as part of the trawl rationalization program. FOR FURTHER INFORMATION CONTACT: Jamie Goen, phone..., NMFS implemented a trawl rationalization program, a catch share program, for the Pacific coast...

  20. A continuing success - The United States Foreign Research Reactor Spent Nuclear Fuel Acceptance Program

    International Nuclear Information System (INIS)

    Mustin, Tracy P.; Clapper, Maureen; Reilly, Jill E.

    2000-01-01

    The United States Department of Energy, in consultation with the Department of State, adopted the Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel in May 1996. To date, the Foreign Research Reactor (FRR) Spent Nuclear Fuel (SNF) Acceptance Program, established under this policy, has completed 16 spent fuel shipments. 2,651 material test reactor (MTR) assemblies, one Slowpoke core containing less than 1 kilogram of U.S.-origin enriched uranium, 824 Training, Research, Isotope, General Atomic (TRIGA) rods, and 267 TRIGA pins from research reactors around the world have been shipped to the United States so far under this program. As the FRR SNF Acceptance Program progresses into the fifth year of implementation, a second U.S. cross country shipment has been completed, as well as a second overland truck shipment from Canada. Both the cross country shipment and the Canadian shipment were safely and successfully completed, increasing our knowledge and experience in these types of shipments. In addition, two other shipments were completed since last year's RERTR meeting. Other program activities since the last meeting included: taking pre-emptive steps to avoid license amendment pitfalls/showstoppers for spent fuel casks, publication of a revision to the Record of Decision allowing up to 16 casks per ocean going vessel, and the issuance of a cable to 16 of the 41 eligible countries reminding their governments and the reactor operators that the U.S.-origin uranium in their research reactors may be eligible for return to the United States under the Acceptance Program and urging them to begin discussions on shipping schedules. The FRR SNF program has also supported the Department's implementation of the competitive pricing policy for uranium and resumption of shipments of fresh uranium for fabrication into assemblies for research reactors. The United States Foreign Research Reactor Spent Nuclear Fuel Acceptance Program continues