  1. Accelerating RCRA corrective action: The principles of the DOE approach

    International Nuclear Information System (INIS)

    Kimmell, T.A.; Green, D.R.; Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The US Department of Energy (DOE) is involved in the remediation of environmental contamination at many of its facilities under the Resource Conservation and Recovery Act (RCRA). RCRA's corrective action provisions were established by the Hazardous and Solid Waste Amendments of 1984 (HSWA). In response to the HSWA mandate, EPA established a program for the conduct of RCRA corrective action that was similar to that established under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). In addition, EPA developed and implemented its ''stabilization'' initiative as a means of quickly addressing immediate risks posed by releases until long term solutions can be applied. To improve the efficiency of environmental restoration at its facilities, DOE is developing guidance and training programs on accelerated environmental restoration under RCRA. A RCRA guidance document, entitled ''Accelerating RCRA Corrective Action at DOE Facilities,'' is currently being developed by DOE's Office of Environmental Policy and Assistance. The new guidance document will outline a decision-making process for determining if acceleration is appropriate for individual facilities, for identifying, evaluating, and selecting options for program acceleration, and for implementing selected acceleration options. The document will also discuss management and planning strategies that provide a firm foundation for accelerating RCRA corrective action. These strategies include a number of very basic principles that have proven effective at DOE and other federal facilities, as well as some new approaches. The purpose of this paper is to introduce DOE's new guidance document, discuss the general approach presented in the guidance for accelerating RCRA corrective action, and to emphasize some of the more important principles of effective management and planning

  2. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  3. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  4. RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988

  5. Performance Demonstration Program Plan for RCRA Constituent Analysis of Solidified Wastes

    International Nuclear Information System (INIS)

    2006-01-01

    The Performance Demonstration Program (PDP) for Resource Conservation and Recovery Act (RCRA) constituents distributes test samples for analysis of volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and metals in solid matrices. Each distribution of test samples is termed a PDP cycle. These evaluation cycles provide an objective measure of the reliability of measurements performed for transuranic (TRU) waste characterization. The primary documents governing the conduct of the PDP are the Quality Assurance Program Document (QAPD; DOE/CBFO-94-1012) and the Waste Isolation Pilot Plant (WIPP) Waste Analysis Plan (WAP) contained in the Hazardous Waste Facility Permit (NM4890139088-TSDF) issued by the New Mexico Environment Department. The WAP requires participation in the PDP; the PDP must comply with the QAPD and the WAP. This plan implements the general requirements of the QAPD and the applicable requirements of the WAP for the RCRA PDP. Participating laboratories demonstrate acceptable performance by successfully analyzing single-blind performance evaluation samples (subsequently referred to as PDP samples) according to the criteria established in this plan. PDP samples are used as an independent means to assess laboratory performance regarding compliance with the WAP quality assurance objectives (QAOs). The concentrations of analytes in the PDP samples address levels of regulatory concern and encompass the range of concentrations anticipated in waste characterization samples. The WIPP requires analyses of homogeneous solid wastes to demonstrate compliance with regulatory requirements. These analyses must be performed by laboratories that demonstrate acceptable performance in this PDP. These analyses are referred to as WIPP analyses, and the samples on which they are performed are referred to as WIPP samples. Participating laboratories must analyze PDP samples using the same procedures used for WIPP samples.

  6. Groundwater Monitoring Plan for the 1301-N, 1324-N/NA, and 1325-N RCRA Facilities

    International Nuclear Information System (INIS)

    Hartman, Mary J.

    2001-01-01

    The 1301-N and 1325-N Liquid Waste Disposal Facilities, the 1324-N Surface Impoundment, and the 1324-NA Percolation Pond, located in the 100 N Area of the Hanford Site, are regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The closure plans for these facilities stipulate that groundwater is monitored according to the 100-N Pilot Project: Proposed Consolidated Groundwater Monitoring Program (BHI-00725). This document supplements the consolidated plan by providing information on sampling and analysis protocols, quality assurance, data management, and a conceptual model for the RCRA sites. Monitoring well networks, constituents, and sampling frequency remain the same as in the consolidated plan or the previous groundwater monitoring plan (Hartman 1996)

  7. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  8. RCRA Assessment Plan for Single-Shell Tank Waste Management Area TX-TY

    Energy Technology Data Exchange (ETDEWEB)

    Horton, Duane G.

    2007-03-26

    WMA TX-TY contains underground, single-shell tanks that were used to store liquid waste that contained chemicals and radionuclides. Most of the liquid has been removed, and the remaining waste is regulated under the RCRA as modi¬fied in 40 CFR Part 265, Subpart F and Washington State’s Hazardous Waste Management Act . WMA TX-TY was placed in assessment monitoring in 1993 because of elevated specific conductance. A groundwater quality assessment plan was written in 1993 describing the monitoring activities to be used in deciding whether WMA TX-TY had affected groundwater. That plan was updated in 2001 for continued RCRA groundwater quality assessment as required by 40 CFR 265.93 (d)(7). This document further updates the assessment plan for WMA TX-TY by including (1) information obtained from ten new wells installed at the WMA after 1999 and (2) information from routine quarterly groundwater monitoring during the last five years. Also, this plan describes activities for continuing the groundwater assessment at WMA TX TY.

  9. Resource conversation and recovery act (RCRA) Contingency Plan for interim status or permitted units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1992-08-01

    The official mission of the Y-12 Plant is to serve as a manufacturing technology center for key processes such that capabilities are maintained for safe, secure, reliable, and survivable nuclear weapons systems and other applications of national importance. The Y-12 RCRA Contingency Plan will be reviewed and revised if necessary if the facility RCRA operating permits are revised, the plan is inadequate in an emergency, the procedures herein can be improved, the facility's operations change in a manner that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Preparedness Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste interim status or permitted treatment, storage, or disposal facilities. The 90-day storage areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  10. Implementing RCRA during facility deactivation

    International Nuclear Information System (INIS)

    Lebaron, G.J.

    1997-01-01

    RCRA regulations require closure of permitted treatment, storage and disposal (TSD) facilities within 180 days after cessation of operations, and this may essentially necessitate decommissioning to complete closure. A more cost effective way to handle the facility would be to significantly reduce the risk to human health and the environment by taking it from its operational status to a passive, safe, inexpensive-to-maintain surveillance and maintenance condition (deactivation) prior to decommissioning. This paper presents an innovative approach to the cost effective deactivation of a large, complex chemical processing facility permitted under RCRA. The approach takes into account risks to the environment posed by this facility in comparison to risks posed by neighboring facilities at the site. The paper addresses the manner in which: 1) stakeholders and regulators were involved; 2) identifies a process by which the project proceeds and regulators and stakeholders were involved; 3) end points were developed so completion of deactivation was clearly identified at the beginning of the project, and 4) innovative practices were used to deactivate more quickly and cost effectively

  11. Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about sampling design, required analyses, and sample collection and handling procedures, is to be used in conjunction with the Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System

  12. RCRA corrective action for underground storage tanks -- Subtitle C for Subtitle I

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of this report is to provide guidance to DOE and DOE contractor personnel responsible for planning and implementation of corrective measures addressing cleanup of releases of hazardous materials or regulated substances from underground storage tanks regulated under RCRA Subtitle C or Subtitle I

  13. Resource Conservation and Recovery Act (RCRA) new-employee training manual for the Operations Division RCRA personnel

    Energy Technology Data Exchange (ETDEWEB)

    Barkenbus, B.D.

    1987-03-01

    This manual has been prepared for the training of new employees who will work with RCRA hazardous waste management in the Operations Division. It will be taught by a person who is trained in hazardous waste regulations/procedures. It consists of nine modules. The topics of these modules are: RCRA Training, Hazardous Waste Regulations, Transportation Regulations, Hazardous Waste Management at ORNL, Chemical Hazards and Safety, Hazardous Waste Operations Training, Sampling of Hazardous Waste, Hazardous Waste Identification/Classification, and RCRA Contingency Plans and Emergency Procedures. The on-the-job training areas are identified in the modules. They are an integral part of training.

  14. Resource Conservation and Recovery Act (RCRA) contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-08-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  15. CERCLA and RCRA requirements affecting cleanup of a hazardous waste management unit at a Superfund site: A case study

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1995-03-01

    The Fernald Environmental Management Project (FEMP) attempted to address both RCRA and CERCLA requirements at the fire training facility (FTF) by integrating a CERCLA removal action work plan with a RCRA closure plan. While the regulatory agencies involved with the FTF cleanup agreed the integrated document was a good idea, implementation proved complicated, owing to disposition of clean debris from a Superfund site, treatment of contaminated media, duration of cleanup activities, and cleanup certification. While all the complications have not been resolved, solutions to all have been proposed to Ohio EPA and U.S. EPA. Both agencies have worked closely with FEMP to find the most effective fulfillment of RCRA and CERCLA requirements

  16. Resource Conservation and Recovery Act (RCRA) general contingency plan for hazardous waste treatment, storage, and disposal units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    Skaggs, B.E.

    1993-11-01

    The Y-12 RCRA Contingency Plan will be continually reviewed and revised if any of the following occur: the facility permit is revised, the plan is inadequate in an emergency, the procedures herein can be improved, the operations of the facility change in a way that alters the plan, the emergency coordinator changes, or the emergency equipment list changes. Copies of the Y-12 Emergency Management Plan are available at the Plant Shift Superintendent's Office and the Emergency Management Office. This document serves to supplement the Y-12 Emergency Management Plan to be appropriate for all RCRA hazardous waste treatment, storage, or disposal units. The 90-day accumulation areas at the Y-12 Plant have a separate contingency supplement as required by RCRA and are separate from this supplement

  17. When RCRA meets ALARA

    International Nuclear Information System (INIS)

    Kirner, N.P.

    1990-01-01

    This paper proposes a method to identify an inconsistency between RCRA and AEA and for distinguishing a true inconsistency from a compliance difficulty. The paper also provides examples of each situation, accommodating specific RCRA requirements to maintain adherence to radiation protection requirements. The proposed method is derived from radiation protection guidance to Federal agencies for occupational exposure that was issued by EPA, under authority derived from Executive Order 10831, the AEA, and Reorganization Plan No. 3 of 1970. This EPA guidance was approved by President Reagan on January 20, 1987 and closely reflects the guidance of national and international radiation standard-setting groups

  18. Resource Conservation and Recovery Act (RCRA)

    International Nuclear Information System (INIS)

    1989-01-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation Program Plan has been developed to provide a framework for the completion of RCRA Facility Investigations (RFI) at identified units on the Savannah Rive Site (SRS) facility. As such, the RFI Program Plan provides: technical guidance for all work to be performed, managerial control, a practical, scientific approach. The purpose of this Overview is to demonstrate how the basic RFI Program Plan elements (technical, management, and approach) are interwoven to provide a practical and workable plan. The goal of the RFI Program Plan is to provide a systematic, uniform approach for performance and reporting. In addition, the RFI Program Plan has been developed to be specific to the SRS facility and to adhere to the Environmental Protection Agency (EPA) RFI guidance received as part of the SRS. The US EPA publication ''Characterization of Hazardous Waste Sites'' has been liberally adapted for use in this RFI Program Plan

  19. RCRA facility stabilization initiative

    International Nuclear Information System (INIS)

    1995-02-01

    The RCRA Facility Stabilization Initiative was developed as a means of implementing the Corrective Action Program's management goals recommended by the RIS for stabilizing actual or imminent releases from solid waste management units that threaten human health and the environment. The overall goal of stabilization is to, as situations warrant, control or abate threats to human health and/or the environment from releases at RCRA facilities, and/or to prevent or minimize the further spread of contamination while long-term remedies are pursued. The Stabilization initiative is a management philosophy and should not be confused with stabilization technologies

  20. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  1. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  2. Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System - 1997 Notice of Violation Consent Order; TOPICAL

    International Nuclear Information System (INIS)

    Evans, S.K.

    2002-01-01

    This Quality Assurance Project Plan for the HWMA/RCRA Closure Certification of the TRA- 731 Caustic and Acid Storage Tank System is one of two documents that comprise the Sampling and Analysis Plan for the HWMA/RCRA closure certification of the TRA-731 caustic and acid storage tank system at the Idaho National Engineering and Environmental Laboratory. This plan, which provides information about the project description, project organization, and quality assurance and quality control procedures, is to be used in conjunction with the Field Sampling Plan for the HWMA/RCRA Closure Certification of the TRA-731 Caustic and Acid Storage Tank System. This Quality Assurance Project Plan specifies the procedures for obtaining the data of known quality required by the closure activities for the TRA-731 caustic and acid storage tank system

  3. Mobilization plan for the Y-12 9409-5 tank storage facility RCRA closure plan. Final report. Revision 1

    International Nuclear Information System (INIS)

    1993-11-01

    This mobilization plan identifies the activities and equipment necessary to begin the field sampling for the Oak Ridge Y-12 9409-5 Diked Tank Storage Facility (DTSF) Resource Conservation and Recovery Act (RCRA) closure. Elements of the plan outline the necessary components of each mobilization task and identify whether SAIC or the Martin Marietta Energy Systems, Inc. Y-12 Environmental Restoration Division will be responsible for task coordination. Field work will be conducted in two phases: mobilization phase and soil sampling phase. Training and medical monitoring, access, permits and passes, decontamination/staging area, equipment, and management are covered in this document

  4. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk- In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-01-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Subsequently, this plan was modified again and approved as Y/TS-395, Revised RCRA Closure Plan for the Bear Creek Burial Grounds (February 29, 1988). Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. The plan was presented to the state of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. This amended closure plan goes further to include inspection and maintenance criteria along with other details

  5. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  6. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  7. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  8. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    International Nuclear Information System (INIS)

    ROGERS, P.M.

    2000-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted

  9. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  10. RCRA corrective action determination of no further action

    International Nuclear Information System (INIS)

    1996-06-01

    On July 27, 1990, the U.S. Environmental Protection Agency (EPA) proposed a regulatory framework (55 FR 30798) for responding to releases of hazardous waste and hazardous constituents from solid waste management units (SWMUs) at facilities seeking permits or permitted under the Resource Conservation and Recovery Act (RCRA). The proposed rule, 'Corrective Action for Solid Waste Management Units at Hazardous Waste Facilities', would create a new Subpart S under the 40 CFR 264 regulations, and outlines requirements for conducting RCRA Facility Investigations, evaluating potential remedies, and selecting and implementing remedies (i.e., corrective measures) at RCRA facilities. EPA anticipates instances where releases or suspected releases of hazardous wastes or constituents from SWMUs identified in a RCRA Facility Assessment, and subsequently addressed as part of required RCRA Facility Investigations, will be found to be non-existent or non-threatening to human health or the environment. Such releases may require no further action. For such situations, EPA proposed a mechanism for making a determination that no further corrective action is needed. This mechanism is known as a Determination of No Further Action (DNFA) (55 FR 30875). This information Brief describes what a DNFA is and discusses the mechanism for making a DNFA. This is one of a series of Information Briefs on RCRA corrective action

  11. Establishing a regulatory framework for a RCRA corrective action program

    International Nuclear Information System (INIS)

    Krueger, J.W.

    1989-01-01

    Recently, the environmental community has become keenly aware of problems associated with integration of the demanding regulations that apply to environmental restoration activities. Once can not attend an EPA-sponsored conference on Superfund without hearing questions concerning the Resource, Conservation, and Recovery Act (RCRA) and the applicability of the National Contingency Plan (NCP) to sites that do not qualify for the National Priorities List (NPL). In particular, the U.S. Department of Energy (DOE) has been greatly criticized for its inability to define a comprehensive approach for cleaning up its hazardous waste sites. This article presents two decision flowcharts designed to resolve some of this confusion for DOE. The RCRA/CERCLA integration diagram can help the environmental manager determine which law applies and under what conditions, and the RCRA corrective action decision flowchart can guide the manager in determining which specific sections of RCRA apply to a RCRA-lead environmental restoration program

  12. RCRA corrective action program guide (Interim)

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) is responsible for compliance with an increasingly complex spectrum of environmental regulations. One of the most complex programs is the corrective action program proposed by the US Environmental Protection Agency (EPA) under the authority of the Resource Conservation and Recovery Act (RCRA) as amended by the Hazardous and Solid Waste Amendments (HSWA). The proposed regulations were published on July 27, 1990. The proposed Subpart S rule creates a comprehensive program for investigating and remediating releases of hazardous wastes and hazardous waste constituents from solid waste management units (SWMUs) at facilities permitted to treat, store, or dispose of hazardous wastes. This proposed rule directly impacts many DOE facilities which conduct such activities. This guidance document explains the entire RCRA Corrective Action process as outlined by the proposed Subpart S rule, and provides guidance intended to assist those persons responsible for implementing RCRA Corrective Action at DOE facilities.

  13. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  14. RCRA and CERCLA requirements affecting cleanup activities at a federal facility superfund site

    International Nuclear Information System (INIS)

    Walsh, T.J.

    1994-01-01

    The Fernald Environmental Management Project (FEMP) achieved success on an integrated groundwater monitoring program which addressed both RCRA and CERCLA requirements. The integrated plan resulted in a cost savings of approximately $2.6 million. At present, the FEMP is also working on an integrated closure process to address Hazardous Waste Management Units (HWMUs) at the site. To date, Ohio EPA seems willing to discuss an integrated program with some stipulations. If an integrated program is implemented, a cost savings of several million dollars will be realized since the CERCLA documents can be used in place of a RCRA closure plan. The success of an integrated program at the FEMP is impossible without the support of DOE and the regulators. Since DOE is an owner/operator of the facility and Ohio EPA regulates hazardous waste management activities at the FEMP, both parties must be satisfied with the proposed integration activities. Similarly, US EPA retains CERCLA authority over the site along with a signed consent agreement with DOE, which dictates the schedule of the CERCLA activities. Another federal facility used RCRA closure plans to satisfy CERCLA activities. This federal facility was in a different US EPA Region than the FEMP. While this approach was successful for this site, an integrated approach was required at the FEMP because of the signed Consent Agreement and Consent Decree. For federal facilities which have a large number of HWMUs along with OUs, an integrated approach may result in a timely and cost-effective cleanup

  15. NGLW RCRA Storage Study

    International Nuclear Information System (INIS)

    Waters, R.J.; Ochoa, R.; Fritz, K.D.; Craig, D.W.

    2000-01-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning

  16. NGLW RCRA Storage Study

    Energy Technology Data Exchange (ETDEWEB)

    R. J. Waters; R. Ochoa; K. D. Fritz; D. W. Craig

    2000-06-01

    The Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Engineering and Environmental Laboratory contains radioactive liquid waste in underground storage tanks at the INTEC Tank Farm Facility (TFF). INTEC is currently treating the waste by evaporation to reduce the liquid volume for continued storage, and by calcination to reduce and convert the liquid to a dry waste form for long-term storage in calcine bins. Both treatment methods and activities in support of those treatment operations result in Newly Generated Liquid Waste (NGLW) being sent to TFF. The storage tanks in the TFF are underground, contained in concrete vaults with instrumentation, piping, transfer jets, and managed sumps in case of any liquid accumulation in the vault. The configuration of these tanks is such that Resource Conservation and Recovery Act (RCRA) regulations apply. The TFF tanks were assessed several years ago with respect to the RCRA regulations and they were found to be deficient. This study considers the configuration of the current tanks and the RCRA deficiencies identified for each. The study identifies four potential methods and proposes a means of correcting the deficiencies. The cost estimates included in the study account for construction cost; construction methods to minimize work exposure to chemical hazards, radioactive contamination, and ionizing radiation hazards; project logistics; and project schedule. The study also estimates the tank volumes benefit associated with each corrective action to support TFF liquid waste management planning.

  17. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  18. Successful completion of a RCRA closure for the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Lippitt, J.M.; Kolthoff, K.

    1995-01-01

    This paper discusses the successful completion of a RCRA (Resource Conservation and Recovery Act) closure of a HF (hydrofluoric acid) tank car at FEMP, which is on the national priorities list of hazardous waste sites and is undergoing CERCLA remediation. The HF tank car closure was conducted by FERMCO. Through a combination of sound planning and team work, the HF tank car was closed safely and ahead of schedule. During > 22,000 hr field work required for construction modifications and neutralization of 9,600 gallons of HF and decontamination rinseates, there were no OSHA recordable incidents. The system design avoided additional costs by maximizing use of existing equipment and facilities. This successful closure of the HF tank car demonstrates FEMP's commitment to reducing risks and cleaning up the facility in a manner consistent with objectives of RCRA regulations and the Ohio EPA hazardous waste rules. This in turn facilitated ongoing negotiations with Ohio EPA to integrate RCRA closure and the ongoing CERCLA remediation activities. This paper addresses why the unit was clean closed under an approved RCRA Closure Plan. Integration of EPA regulations for RCRA and CERCLA programs and the DOE-Orders impacting design, construction and operation of an acid neutralization system is also reviewed. The paper concludes with a discussion of lessons learned in the process in preparing the closure plant and through final project close out

  19. RCRA, a state perspective: the buck should stop with us

    Energy Technology Data Exchange (ETDEWEB)

    McCall, III, M N

    1977-11-01

    The states must carry the ball of realizing the Resource Conservation and Recovery Act (RCRA); state agencies and the EPA can work together, though they don't always agree; adequate funding is absolutely necessary. The states' perspective of their role is threefold-regulation, assistance, and leadership, with maximum input into implementation. A National Governors' Association committee on waste management was established. Neither RCRA itself nor supporting committee reports allow definition of open dumps and sanitary landfills with other than traditional meaning. Conducting the open dump inventory should be the responsibility of the states, with financial support from EPA. The existence of state nonimportation laws should not preclude that state from receiving money for a hazardous waste program. The criteria for defining hazardous wastes must be realistic if an unmanageable list is to be avoided. State solid waste management agencies must provide aid to local government and private industry. The state-not EPA- is the best level of government to carry out an effective solid waste program. The Federal program should concentrate on resource and energy conservation, research and development, demonstration projects, establishing markets for recycled materials, and education and training programs. Planning should be coordinated through state agencies.

  20. Achieving RCRA compliance in DOE defense waste management operations

    International Nuclear Information System (INIS)

    Frankhauser, W.A.; Shepard, M.D.

    1989-01-01

    The U.S. Department of Energy (DOE) generates significant volumes of radioactive mixed waste (RMW) through its defense-related activities. Defense RMW is co-regulated by DOE and the U.S. Environmental Protection Agency/State agencies in accordance with requirements of the Resource Conservation and Recovery Act (RCRA) and the Atomic Energy Act (AEA). This paper highlights some of the problems encountered in co-regulation and discusses achievements of the defense waste management program in integrating RCRA requirements into RMW operations. Defense waste sites are planning facility modifications and major new construction projects to develop treatment, storage and disposal capacity for existing RMW inventories and projected needs

  1. Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for Single-Shell Tank (SST) Waste Management Areas

    International Nuclear Information System (INIS)

    MCCARTHY, M.M.

    1999-01-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly

  2. Combination RCRA groundwater monitoring plan for the 216-A-10, 216-A-36B, and 216-A-37-1 PUREX cribs

    International Nuclear Information System (INIS)

    Lindberg, J.W.

    1997-06-01

    This document presents a groundwater quality assessment monitoring plan, under Resource Conservation and Recovery Act of 1976 (RCRA) regulatory requirements for three RCRA sites in the Hanford Site's 200 East Area: 216-A-10, 216-A-36B, and 216-A-37-1 cribs (PUREX cribs). The objectives of this monitoring plan are to combine the three facilities into one groundwater quality assessment program and to assess the nature, extent, and rate of contaminant migration from these facilities. A groundwater quality assessment plan is proposed because at least one downgradient well in the existing monitoring well networks has concentrations of groundwater constituents indicating that the facilities have contributed to groundwater contamination. The proposed combined groundwater monitoring well network includes 11 existing near-field wells to monitor contamination in the aquifer in the immediate vicinity of the PUREX cribs. Because groundwater contamination from these cribs is known to have migrated as far away as the 300 Area (more than 25 km from the PUREX cribs), the plan proposes to use results of groundwater analyses from 57 additional wells monitored to meet environmental monitoring requirements of US Department of Energy Order 5400.1 to supplement the near-field data. Assessments of data collected from these wells will help with a future decision of whether additional wells are needed

  3. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    Energy Technology Data Exchange (ETDEWEB)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  4. Characterizing cemented TRU waste for RCRA hazardous constituents

    International Nuclear Information System (INIS)

    Yeamans, D.R.; Betts, S.E.; Bodenstein, S.A.

    1996-01-01

    Los Alamos National Laboratory (LANL) has characterized drums of solidified transuranic (TRU) waste from four major waste streams. The data will help the State of New Mexico determine whether or not to issue a no-migration variance of the Waste Isolation Pilot Plant (WIPP) so that WIPP can receive and dispose of waste. The need to characterize TRU waste stored at LANL is driven by two additional factors: (1) the LANL RCRA Waste Analysis Plan for EPA compliant safe storage of hazardous waste; (2) the WIPP Waste Acceptance Criteria (WAC) The LANL characterization program includes headspace gas analysis, radioassay and radiography for all drums and solids sampling on a random selection of drums from each waste stream. Data are presented showing that the only identified non-metal RCRA hazardous component of the waste is methanol

  5. RCRA Closure Plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-04-01

    In June 1987, the RCRA Closure/Postclosure Plan for the Bear Creek Burial Grounds (BCBG) was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval. TDEC modified and issued the plan approved on September 30, 1987. Y/TS-395 was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits of BCBG. However, a concept was developed to include the B Area (non-RCRA regulated) in the Walk-In Pits so that both areas would be closed under one cap. This approach included a tremendous amount of site preparation with an underlying stabilization base of 16 ft of sand for blast protection. In January 1993, the Closure Plan was revised to include inspection and maintenance criteria and to reflect that future monitoring and remediation would be conducted as part of the ongoing Comprehensive Environmental Response, Compensation, and Liability Act activities at the Oak Ridge Y-12 Plant. This Closure Plan revision is intended to reflect the placement of the Kerr Hollow Quarry debris at the Walk-In Pits, revise the closure dates, and acknowledge that the disposition of a monitoring well within the closure site cannot be verified

  6. RCRA corrective action and closure

    International Nuclear Information System (INIS)

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators' interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE's permitted facilities and interim status facilities

  7. Clues to interpretation of RCRA regulations

    International Nuclear Information System (INIS)

    Siebach, P.R.; Brown, P.H.

    1992-01-01

    Waste waters from industrial facilities are often treated at waste water treatment plants and then discharged to streams or rivers, or may be reused. Discharges of pollutants to waterways are regulated under the Clean Water Act, and require a permit. The Resource Conservation and Recovery Act (RCRA) regulates the management of solid wastes. This paper discusses the status of waste water treatment plant discharges and sludges pursuant to RCRA. It concludes that some exceptions to RCRA allow waste water treatment plants to accept dilute solvent mixtures, treat them, and discharge effluent without needing a RCRA permit. If residual sludges do not exhibit a hazardous characteristic, then they may be managed as nonhazardous solid waste. For DOE and other generators of mixed waste (both radioactive and hazardous), this may allow sludges to be managed as low level radioactive waste. (author)

  8. Revised RCRA closure plan for the Interim Drum Yard (S-030) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Smith, C.M.

    1994-09-01

    The Interim Drum Yard (IDY) facility is a containerized waste storage area located in the Y-12 exclusion area. It was used to store waste materials which are regulated by RCRA (Resource Conservation and Recovery Act); uranyl nitrate solutions were also stored there. The closure plan outlines the actions required to achieve closure of IDY and is being submitted in accordance with TN Rule 1200-1-11.05(7) and 40 CFR 265.110

  9. Decontamination Study for Mixed Waste Storage Tanks RCRA Closure

    International Nuclear Information System (INIS)

    Leaphart, D.M.; Reed, S.R.; Rankin, W.N.

    1995-01-01

    The Savannah River Site (SRS) plans to close six underground tanks storing mixed waste under RCRA regulations. In support of this closure effort, a study was performed to determine the optimal method of decontaminating these tanks to meet the closure requirements. Items consaidered in the evaluation of the decontamination methods included effectiveness, compatibility with existing waste residues, possible cleaning solution disposal methods, and cost

  10. SACM and the RCRA stabilization initiative: Similarities of principles and applicability

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) provide standards for the remediation of environmental media contaminated with hazardous substances or hazardous waste, respectively. In both cases, prior to the US Environmental Protection Agency`s (EPA) development of the two subject reform initiatives, existing formal processes specified the level of site investigation required, the process for reaching a decision on the method of remediation, public participation in the decision process, and enforcement authorities that include orders and schedules of compliance. Traditionally, implementation of these processes has resulted in a great amount of time, effort, and money being expended before actual remediation began. Following criticism from the public and the regulated community, the EPA has proposed streamlining reforms for hazardous waste site cleanup under both CERCLA and RCRA that will begin remediation sooner with lower costs. The purpose of this Information Brief is to discuss the common goals, processes, and strategies of the Superfund Accelerated Cleanup Model (SACM) and the RCRA Stabilization Initiative.

  11. RCRA and Operational Monitoring (ROM). Multi-Year Program Plan and Fiscal Year 95 Work Plan WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-17

    This document contains information concerning the RCRA and Operational Monitoring Program at Hanford Reservation. Information presented includes: Schedules for ground water monitoring activities, program cost baseline, program technical baseline, and a program milestone list.

  12. Groundwater monitoring plan for the Hanford Site 216-B-3 pond RCRA facility

    International Nuclear Information System (INIS)

    Barnett, D.B.; Chou, C.J.

    1998-06-01

    The 216-B-3 pond system was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In operation since 1945, the B Pond system has been a RCRA facility since 1986, with Resource Conservation and Recovery Act (RCRA) interim-status groundwater monitoring in place since 1988. In 1994, discharges were diverted from the main pond, where the greatest potential for contamination was thought to reside, to the 3C expansion pond. In 1997, all discharges to the pond system were discontinued. In 1990, the B Pond system was elevated from detection groundwater monitoring to an assessment-level status because total organic halogens and total organic carbon were found to exceed critical means in two wells. Subsequent groundwater quality assessment failed to find any specific hazardous waste contaminant that could have accounted for the exceedances, which were largely isolated in occurrence. Thus, it was recommended that the facility be returned to detection-level monitoring

  13. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    Energy Technology Data Exchange (ETDEWEB)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-03-22

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information.

  14. Approved Site Treatment Plan, Volumes 1 and 2. Revision 4

    International Nuclear Information System (INIS)

    Helmich, E.H.; Molen, G.; Noller, D.

    1996-01-01

    The US Department of Energy, Savannah River Operations Office (DOE-SR), has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume 1. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore, pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE's requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021. Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW. The Compliance Plan Volume (Volume 1) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume 2) and is provided for information

  15. Interpreting the SARA and RCRA training requirements

    International Nuclear Information System (INIS)

    Moreland, W.M.; Wells, S.M.

    1987-01-01

    The Resource Conservation and Recovery Act (RCRA) and the Superfund Amendments and Reauthorization Act (SARA) promulgated by the EPA (RCRA) and the OSHA (SARA) require hazardous materials training for all individuals working with hazardous materials. Facilities that are involved in the generation, storage, treatment, transportation, or disposal/removal of hazardous materials/waste must comply with all relevant training regulations. Using the guidelines contained in the RCRA and SARA regulations, decisions must be made to determine: the type of regulatory requirement based on facility function (i.e., whether the facility is a RCRA or CERCLA facility). The type of training required for specific categories of workers (e.g. managers, supervisors, or general site workers). The level of training needed for each category of worker. This presentation outlines how the Environmental Compliance and Health Protection Technical Resources and Training Group, working with waste operations personnel, establishes specific training requirements

  16. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update (U)

    International Nuclear Information System (INIS)

    Lawrence, B.; Berry, M.

    1998-03-01

    The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE's requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information

  17. Savannah River Site Approved Site Treatment Plan, 1998 Annual Update

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, B. [Westinghouse Savannah River Company, AIKEN, SC (United States); Berry, M.

    1998-03-01

    The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

  18. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    International Nuclear Information System (INIS)

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc

  19. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    International Nuclear Information System (INIS)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans

  20. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2

  1. Hanford Site waste minimization and pollution prevention awareness program plan

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This plan, which is required by US Department of Energy (DOE) Order 5400. 1, provides waste minimization and pollution prevention guidance for all Hanford Site contractors. The plan is primary in a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan, Prime contractor implementation plans, and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation (DOE-RL, 1997a) describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Items discussed include the pollution prevention policy and regulatory background, organizational structure, the major objectives and goals of Hanford Site's pollution prevention program, and an itemized description of the Hanford Site pollution prevention program. The document also includes US Department of Energy, Richland Operations Office's (RL's) statement of policy on pollution prevention as well as a listing of regulatory drivers that require a pollution prevention program

  2. Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

  3. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-12-01

    The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste fadities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCIA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RIFA)/RCRA Facility Investigation (RFI)/Coffective Measures Study (CMS)/Corrective Measures Implementation process. Under CERCLA, the actions follow the Pre at sign ary Assessment/Site Investigation (PA/Sl) Remedial Investigation Feasibility Study (RI/FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCIA into an RI Work Plan for the lint phase of characterization of Bear Creek Valley (BCV) Operable Unit (OU) 4

  4. HANFORD TANK FARM RESOURCE CONSERVATION and RECOVERY ACT (RCRA) CORRECTIVE ACTION PROGRAM

    International Nuclear Information System (INIS)

    KRISTOFZSKI, J.G.

    2007-01-01

    As a consequence of producing special nuclear material for the nation's defense, large amounts of extremely hazardous radioactive waste was created at the US Department of Energy's (DOE) Hanford Site in south central Washington State. A little over 50 million gallons of this waste is now stored in 177 large, underground tanks on Hanford's Central Plateau in tank farms regulated under the Atomic Energy Act and the Resource, Conservation, and Recovery Act (RCRA). Over 60 tanks and associated infrastructure have released or are presumed to have released waste in the vadose zone. In 1998, DOE's Office of River Protection established the Hanford Tank Farm RCRA Corrective Action Program (RCAP) to: (1) characterize the distribution and extent of the existing vadose zone contamination; (2) determine how the contamination will move in the future; (3) estimate the impacts of this contamination on groundwater and other media; (4) develop and implement mitigative measures; and (5) develop corrective measures to be implemented as part of the final closure of the tank farm facilities. Since its creation, RCAP has made major advances in each of these areas, which will be discussed in this paper

  5. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments

  6. Proposed modifications to the RCRA post-closure permit for the Bear Creek Hydrogeologic Regime at the US Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Bear Creek Hydrogeologic Regime (BCHR). These permit conditions define the requirements for RCRA post-closure corrective action groundwater monitoring at the S-3 Ponds, the Oil Landfarm, and the Bear Creek Burial Grounds (units A, C-West, and Walk-in Pits). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Record of Decision (ROD) for the Bear Creek Valley (BCV) Watershed, (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA post-closure corrective action monitoring program during 1996, and (3) update applicable technical procedures with revised versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP). With these modifications, the Y-12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2.0 provides the technical justification for each proposed permit modification. The proposed changes to permit language are provided in Section 3.0 (S-3 Ponds), Section 4.0 (Oil Landfarm), and Section 5.0 (Bear Creek Burial Grounds). Sections 6.0 and 7.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the PCP Attachments.

  7. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments

  8. Proposed modifications to the RCRA post-closure permit for the Chestnut Ridge Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    This report presents proposed modifications to several conditions of the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Chestnut Ridge Hydrogeologic Regime (CRHR) (permit number TNHW-088, EPA ID No. TN3 89 009 0001). These permit conditions define the requirements for RCRA post-closure detection groundwater monitoring at the Chestnut Ridge Sediment Disposal Basin (CRSDB) and Kerr Hollow Quarry (KHQ), and RCRA post-closure corrective action groundwater monitoring at the Chestnut Ridge Security Pits (CRSPs). Modification of these PCP conditions is requested to: (1) clarify the planned integration of RCRA post-closure corrective action groundwater monitoring at the CRSPs with the monitoring program to be established in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) record of decision (ROD), (2) revise several of the current technical requirements for groundwater monitoring based on implementation of the RCRA monitoring programs during 1996, (3) replace several of the technical procedures included in the PCP with updated versions recently issued by the Y-12 Plant Groundwater Protection Program (GWPP), and (4) correct inaccurate regulatory citations and references to permit conditions and permit attachments. With these modifications, the Y- 12 Plant will continue to meet the full intent of all regulatory obligations for post-closure care of these facilities. Section 2 provides the technical justification for each proposed permit modification. Section 3.0 contains proposed changes to Section II of the PCP. Modifications to site-specific permit conditions are presented in Section 4.0 (CRSDB), Section 5.0 (CRSPs), and Section 6.0 (KHQ). Sections 7.0 and 8.0 reference updated and revised procedures for groundwater sampling, and monitoring well plugging and abandonment, respectively. Appendix A includes all proposed revisions to the permit attachments.

  9. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  10. Hazardous Waste/IGD: EF_RCRA

    Data.gov (United States)

    U.S. Environmental Protection Agency — EF_RCRA is a subset of facilities from FRS_INTEREST and FRS_FACILITY_SITE which are updated on a monthly basis as part of the Locational Reference Tables (LRT)...

  11. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan

  12. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Chou, C.J.; Johnson, V.G.

    1999-10-07

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan.

  13. EPA R1 RCRA Corrective Action 2020 Baseline Site Property Boundaries

    Data.gov (United States)

    U.S. Environmental Protection Agency — Property boundaries as indicated in figures of all facilities subject to RCRA Corrective Action on the 2020 baseline in Region 1. For more information on the RCRA...

  14. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  15. Quarterly RCRA Groundwater Monitoring Data for the Period July through September 2006

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.

    2007-02-01

    This report provides information about RCRA groundwater monitoring for the period July through September 2006. Eighteen Resource Conservation and Recovery Act (RCRA) sites were sampled during the reporting quarter.

  16. INSPTRAX - The Inspection Targeting, Planning and Tracking Database

    Data.gov (United States)

    U.S. Environmental Protection Agency — The INSPTRAX System tracks Air, RCRA, and Water inspection targeting, planning and tracking information. It is used by the the Air, RCRA, and Water programs to input...

  17. RCRA groundwater data analysis protocol for the Hanford Site, Washington

    International Nuclear Information System (INIS)

    Chou, C.J.; Jackson, R.L.

    1992-04-01

    The Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring program currently involves site-specific monitoring of 20 facilities on the Hanford Site in southeastern Washington. The RCRA groundwater monitoring program has collected abundant data on groundwater quality. These data are used to assess the impact of a facility on groundwater quality or whether remediation efforts under RCRA corrective action programs are effective. Both evaluations rely on statistical analysis of groundwater monitoring data. The need for information on groundwater quality by regulators and environmental managers makes statistical analysis of monitoring data an important part of RCRA groundwater monitoring programs. The complexity of groundwater monitoring programs and variabilities (spatial, temporal, and analytical) exhibited in groundwater quality variables indicate the need for a data analysis protocol to guide statistical analysis. A data analysis protocol was developed from the perspective of addressing regulatory requirements, data quality, and management information needs. This data analysis protocol contains four elements: data handling methods; graphical evaluation techniques; statistical tests for trend, central tendency, and excursion analysis; and reporting procedures for presenting results to users

  18. Costs of RCRA corrective action: Interim report

    International Nuclear Information System (INIS)

    Tonn, B.; Russell, M.; Hwang Ho-Ling; Goeltz, R.; Warren, J.

    1991-09-01

    This report estimates the cost of the corrective action provisions of the Resource Conservation and Recovery Act (RCRA) for all non-federal facilities in the United States. RCRA is the federal law which regulates the treatment, storage, disposal, and recovery of hazardous waste. The 1984 amendment to RCRA, known as the Hazardous and Solid Waste Amendments, stipulates that facilities that treat, store or dispose of hazardous wastes (TSDs) must remediate situations where hazardous wastes have escaped into the environment from their solid waste management units (SWMUs). The US Environmental Protection Agency (USEPA 1990a), among others, believes that the costs of RCRA corrective action could rival the costs of SUPERFUND. Evaluated herein are costs associated with actual remedial actions. The remedial action cost estimating program developed by CH2M Hill is known as the Cost of Remedial Action Model (CORA). It provides cost estimates, in 1987 dollars, by technology used to remediate hazardous waste sites. Rules were developed to categorize each SWMU in the RTI databases by the kinds of technologies that would be used to remediate them. Results were then run through CORA using various assumptions for variable values that could not be drawn from the RTI databases and that did not have CORA supplied default values. Cost estimates were developed under several scenarios. The base case assumes a TSD and SWMU universe equal to that captured in the RTI databases, a point of compliance at the SWMU boundary with no ability to shift wastes from SWMU to SWMU, and a best-as-practical clean-up to health-based standards. 11 refs., 12 figs., 12 tabs

  19. Implementing a Capital Plan.

    Science.gov (United States)

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  20. The WIPP RCRA Part B permit application for TRU mixed waste disposal

    International Nuclear Information System (INIS)

    Johnson, J.E.

    1995-01-01

    In August 1993, the New Mexico Environment Department (NMED) issued a draft permit for the Waste Isolation Pilot Plant (WIPP) to begin experiments with transuranic (TRU) mixed waste. Subsequently, the Department of Energy (DOE) decided to cancel the on-site test program, opting instead for laboratory testing. The Secretary of the NMED withdrew the draft permit in 1994, ordering the State's Hazardous and Radioactive Waste Bureau to work with the DOE on submittal of a revised permit application. Revision 5 of the WIPP's Resource Conservation and Recovery Act (RCRA) Part B Permit Application was submitted to the NMED in May 1995, focusing on disposal of 175,600 m 3 of TRU mixed waste over a 25 year span plus ten years for closure. A key portion of the application, the Waste Analysis Plan, shifted from requirements to characterize a relatively small volume of TRU mixed waste for on-site experiments, to describing a complete program that would apply to all DOE TRU waste generating facilities and meet the appropriate RCRA regulations. Waste characterization will be conducted on a waste stream basis, fitting into three broad categories: (1) homogeneous solids, (2) soil/gravel, and (3) debris wastes. Techniques used include radiography, visually examining waste from opened containers, radioassay, headspace gas sampling, physical sampling and analysis of homogeneous wastes, and review of documented acceptable knowledge. Acceptable knowledge of the original organics and metals used, and the operations that generated these waste streams is sufficient in most cases to determine if the waste has toxicity characteristics, hazardous constituents, polychlorinated biphenyls (PBCs), or RCRA regulated metals

  1. RCRA corrective action ampersand CERCLA remedial action reference guide

    International Nuclear Information System (INIS)

    1994-07-01

    This reference guide provides a side-by-side comparison of RCRA corrective action and CERCLA Remedial Action, focusing on the statutory and regulatory requirements under each program, criterial and other factors that govern a site's progress, and the ways in which authorities or requirements under each program overlap and/or differ. Topics include the following: Intent of regulation; administration; types of sites and/or facilities; definition of site and/or facility; constituents of concern; exclusions; provisions for short-term remedies; triggers for initial site investigation; short term response actions; site investigations; remedial investigations; remedial alternatives; clean up criterial; final remedy; implementing remedy; on-site waste management; completion of remedial process

  2. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention

  3. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL`s assessment of the need for further remedial attention.

  4. RCRA Facilities Assessment (RFA)---Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    US Department of Energy (DOE) facilities are required to be in full compliance with all federal and state regulations. In response to this requirement, the Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program (RAP) to provide comprehensive management of areas where past and current research, development, and waste management activities have resulted in residual contamination of facilities or the environment. This report presents the RCRA Facility Assessment (RFA) required to meet the requirements of RCRA Section 3004(u). Included in the RFA are (1) a listing of all sites identified at ORNL that could be considered sources of releases or potential releases; (2) background information on each of these sites, including location, type, size, period of operation, current operational status, and information on observed or potential releases (as required in Section II.A.1 of the RCRA permit); (3) analytical results obtained from preliminary surveys conducted to verify the presence or absence of releases from some of the sites; and (4) ORNL's assessment of the need for further remedial attention.

  5. RCRA closure plan for the Bear Creek Burial Grounds B Area and Walk-In Pits at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-11-01

    The Bear Creek Burial Grounds (BCBG) are located on the southwest flank of Pine Ridge ∼1.5 miles west of the Oak Ridge Y-12 Plant in Bear Creek Valley. This facility consists of several contiguous disposal sites identified as Burial Grounds A, B, C, and D. Each burial site consists of a series of trenches used for disposal of solid wastes and, in some cases, liquid wastes. Initially, the RCRA Closure/Postclosure plan for the BCBG was intended to apply to A Area, C-West, B Area, and the walk-in pits for BCBG. However, a plan was provided to include the B Area in the walk-in pits so that both areas cold be closed under one cap. The closure plan for B Area and the walk-in pits is presented in this document. The actual quantity and identity of materials is uncertain. The largest volume of material disposed in BCBG consists of uranium-contaminated industrial trash (paper, wood, steel, glass, and rubble)

  6. NPL deletion policy for RCRA-regulated TSD facilities finalized

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Under a new policy published by EPA on March 20, 1995, certain sites may be deleted from the National Priorities List (NPL) and deferred to RCRA corrective action. To be deleted from the NPL, a site must (1) be regulated under RCRA as a treatment, storage, or disposal (TSD) facility and (2) meet the four criteria specified by EPA. The new NPL deletion policy, which does not pertain to federal TSD facilities, became effective on April 19, 1995. 1 tab

  7. RCRA closures at Rocky Flats Plant: A programmatic perspective and case study

    International Nuclear Information System (INIS)

    Ogg, Randy T.; Peterman, Bruce D.

    1992-01-01

    The Interagency Agreement (IAG) integrates a unique mechanism for remediating hazardous waste sites at the Rocky Flats Plant (RFP), which include utilizing RCRA and CERCLA technical/regulatory processes. Pursuant to the IAG signed by the Department of Energy (DOE), Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH) on January 22, 1991, sixteen operable units (OUs) were defined for characterization and remediation at RFP. Of the sixteen OUs, six are classified as Resource Conservation and Recovery Act (RCRA) closure units. The six RCRA interim status closure units are: Solar Evaporation Ponds-OU 4, Present LandfUl-OU 7, Original Process Waste Lines-OU 9, Other Outside Closures-OU 10, West Spray Field-OU II, and Inside Building Closures-OU 15. The IAG will function as a technical/regulatory mechanism for managing/complying with all aspects of the RCRA interim status closure units at RFP. (author)

  8. Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994

    International Nuclear Information System (INIS)

    1995-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and open-quotes Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilitiesclose quotes (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported

  9. Savannah River Site RCRA Facility Investigation plan: Road A Chemical Basin

    International Nuclear Information System (INIS)

    1989-06-01

    The nature of wastes disposed of at the Road A Chemical Basin (RACB) is such that some degree of soil contamination is probable. Lead has also been detected in site monitoring wells at concentrations above SRS background levels. A RCRA Facility Investigation (RFI) is proposed for the RACB and will include a ground penetrating radar (GPR) survey, collection and chemical and radiological analyses of soil cores, installation of groundwater monitoring wells, collection and chemical and radiological analyses of groundwater samples, and collection of chemical and radiological analyses of surface water and sediment samples. Upon completion of the proposed RFI field work and chemical and radiological analyses, and RFI report should be prepared to present conclusions on the nature and extent of contamination at the site, and to make recommendations for site remediation. If contamination is detected at concentrations above SRS background levels, a receptor analysis should be done to evaluate potential impacts of site contamination on nearby populations

  10. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  11. RCRA permit modifications and the functional equivalency demonstration: A case study

    International Nuclear Information System (INIS)

    Kinker, J.; Lyon, W.; Carnes, R.; Loehr, C.; Elsberry, K.; Garcia, P.

    1996-01-01

    Hazardous waste operating permits issued under the Resource Conservation and Recovery Act (RCRA) often impose requirements, typically by reference to the original permit application, that specific components and equipment be used. Consequently, changing these items, even for the purpose of routine maintenance, may first require that the owner/operator request a potentially time-consuming and costly permit modification. However, the owner/operator may demonstrate that a modification is not required because the planned changes are functionally equivalent, as defined by RCRA, to the original specifications embodied by the permit. The Controlled-Air Incinerator at Los Alamos National Laboratory is scheduled for maintenance and improvements that involve replacement of components. The incinerator's carbon adsorption unit/high efficiency particulate air filtration system, in particular, was redesigned to improve reliability and minimize maintenance. A study was performed to determine whether the redesigned unit would qualify as functionally equivalent to the original component. in performing this study, the following steps were taken: (a) the key performance factors were identified; (b) performance data describing the existing unit were obtained; (c) performance of both the existing and redesigned units was simulated; and (d) the performance data were compared to ascertain whether the components could qualify as functionally equivalent

  12. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  13. Quarterly RCRA Groundwater Monitoring Data for the Period April Through June 2006

    Energy Technology Data Exchange (ETDEWEB)

    Hartman, Mary J.

    2006-11-01

    This report provides information about RCRA groundwater monitoring for the period April through June 2006. Seventeen RCRA sites were sampled during the reporting quarter. Sampled sites include seven monitored under groundwater indicator evaluation (''detection'') programs, eight monitored under groundwater quality assessment programs, and two monitored under final-status programs.

  14. RCRA Treatment, Disposal, and Storage Site Boundaries in Louisiana, Geographic NAD83, EPA (2002) [RCRA_TSD_LA_poly_EPA_2002)

    Data.gov (United States)

    Louisiana Geographic Information Center — This is a shapefile of RCRA Treatment, Storage, and Disposal facility boundaries developed by PRC Environmental Management, Inc (PRC) per a Work Assignment from the...

  15. EPA seeks to make RCRA more effective through legislative changes

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Since RCRA was enacted in 1976 and amended in 1984, hazardous waste management has been transformed. To protect human health and the environment as mandated by the act, EPA has developed a complex cradle-to-grave system for managing hazardous waste. The agency recognizes that some targeted legislative changes could make RCRA even more useful, particularly by (1) establishing some open-quotes middle groundclose quotes for waste posing low risks, and (2) emphasizing sensible and enforceable hazardous waste management practices

  16. Strategy and field implementation for determining a dangerous waste mixture in Washington State

    International Nuclear Information System (INIS)

    Cowan, Steve; Foster, Rick; Wright, Jamie

    1992-01-01

    Under the Resource Conservation and Recovery Act (RCRA), states rather than the Environmental Protection Agency (EPA) maybe authorized to implement RCRA regulations. Under RCRA, environmental regulations implemented by an authorized state must be at least as stringent as those contained in RCRA. Compared to RCRA, the corresponding regulations of the State of Washington regarding the determination of characteristic wastes are more stringent and complex. This paper discusses the complexities of the regulations and presents a strategy for successfully managing diverse waste streams. This strategy was used during the cleanup of contaminated areas and equipment at the Albany Research Center (ARC) in Albany, Oregon, which processed uranium and thorium for the Manhattan Engineer District and the Atomic Energy Commission during the early days of the nation's atomic energy program. Wastes from the cleanup of ARC were shipped to the Department of Energy (DOE) Hanford Reservation. Because the DOE Hanford Reservation is located in Washington, this paper should be of interest to DOE waste generators. (author)

  17. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  18. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  19. Identification, classification and management of industrial waste in Kavir steel complex according to the Bazel convention and RCRA

    Directory of Open Access Journals (Sweden)

    Mohammad Hasan Ehrampoush

    2016-06-01

    Full Text Available Introduction: Requiring industries for implementing industrial waste management programs and planning for proper waste disposal is essential in order to achieve sustainable development. Therefore, industrial waste management program was done in Kavir Steel Complex, in Aran va Bidgol region to identify and classify industrial waste and also to present solutions for improving waste management. In this complex, production process is hot rolling steel and the product is rebar. Material and Method: The preset study was conducted in Kavir Steel Complex. Following survey of production process and sources of waste, the type and volume of produced waste were identified and measured during 3 months. Then, the classification of wastes was done according to the Bazel Convention and Resource Conservation and Recovery Act (RCRA, and finally new industrial & health solid waste management program was presented. Result: Considering the volume, industrial waste of production process in Kavir Steel Complex was between 130 to 180 grams per each ton of rebar. Main industrial waste included oxide of steel billet, industrial sludge, used oil and lubricant which were classified according to the RCRA: 8 materials with T code, 1 with C code, 5 with I code and 3 materials with C code. Conclusion: The results revealed that the most amount of industrial waste in Kavir Steel Complex is the waste of steel billet and industrial sludge, and more than 90% of Kavir steel industrial waste were reused and recycled inside or outside of this complex. It is recommended that used oil to be transport and maintain in the safe containers.

  20. National RCRA Hazardous Waste Biennial Report Data Files

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA), in cooperation with the States, biennially collects information regarding the generation, management, and final disposition of hazardous wastes regulated under the Resource Conservation and Recovery Act of 1976 (RCRA), as amended. Collection, validation and verification of the Biennial Report (BR) data is the responsibility of RCRA authorized states and EPA regions. EPA does not modify the data reported by the states or regions. Any questions regarding the information reported for a RCRA handler should be directed to the state agency or region responsible for the BR data collection. BR data are collected every other year (odd-numbered years) and submitted in the following year. The BR data are used to support regulatory activities and provide basic statistics and trend of hazardous waste generation and management. BR data is available to the public through 3 mechanisms. 1. The RCRAInfo website includes data collected from 2001 to present-day (https://rcrainfo.epa.gov/rcrainfoweb/action/main-menu/view). Users of the RCRAInfo website can run queries and output reports for different data collection years at this site. All BR data collected from 2001 to present-day is stored in RCRAInfo, and is accessible through this website. 2. An FTP site allows users to access BR data files collected from 1999 - present day (ftp://ftp.epa.gov/rcrainfodata/). Zip files are available for download directly from this

  1. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    International Nuclear Information System (INIS)

    None, None

    2016-01-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  2. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Bush, Shane [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”

  3. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-09-13

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idaho Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”

  4. Glossary of CERCLA, RCRA and TSCA related terms and acronyms

    International Nuclear Information System (INIS)

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993

  5. Hanford Facility Resource Conservation and Recovery Act Permit General Inspection Plan

    International Nuclear Information System (INIS)

    Beagles, D.S.

    1995-02-01

    This inspection plan describes the activities that shall be conducted for a general inspection of the Hanford Facility. RCRA includes a requirement that general facility inspections be conducted of the 100, 200 East, 200 West, 300, 400, and 1100 areas and the banks of the Columbia River. This plan meets the RCRA requirements and also provides for scheduling of inspections and defines general and specific items to be noted during the inspections

  6. Analysis of TRU waste for RCRA-listed elements

    International Nuclear Information System (INIS)

    Mahan, C.; Gerth, D.; Yoshida, T.

    1996-01-01

    Analytical methods for RCRA listed elements on Portland cement type waste have been employed using both microwave and open hot plate digestions with subsequent analysis by inductively coupled plasma atomic emission spectroscopy (ICP-AES), inductively coupled plasma mass spectrometry (ICP-AES), inductively coupled plasma mass spectrometry (ICP-MS), graphite furnace atomic absorption (GFAA) and cold vapor atomic absorption and fluorescence (CVAA/CVAFS). Four different digestion procedures were evaluated including an open hot plate nitric acid digestion, EPA SW-846 Method 3051, and 2 methods using modifications to Method 3051. The open hot plate and the modified Method 3051, which used aqua regia for dissolution, were the only methods which resulted in acceptable data quality for all 14 RCRA-listed elements. Results for the nitric acid open hot plate digestion were used to qualify the analytical methods for TRU waste characterization, and resulted in a 99% passing score. Direct chemical analysis of TRU waste is being developed at Los Alamos National Laboratory in an attempt to circumvent the problems associated with strong acid digestion methods. Technology development includes laser induced breakdown spectroscopy (LIBS), laser ablation inductively coupled plasma mass spectrometry (LA-ICPMS), dc arc CID atomic emission spectroscopy (DC-AES), and glow discharge mass spectrometry (GDMS). Analytical methods using the Portland cement matrix are currently being developed for each of the listed techniques. Upon completion of the development stage, blind samples will be distributed to each of the technology developers for RCRA metals characterization

  7. Hanford facility RCRA permit condition II.U.1 report: mapping of underground piping

    Energy Technology Data Exchange (ETDEWEB)

    Hays, C.B.

    1996-09-27

    The purpose of this report is to fulfill Condition Il.U.1. of the Hanford Facility (HF) Resource Conservation and Recovery Act (RCRA) Permit. The HF RCRA Permit, Number WA7890008967, became effective on September 28, 1994 (Ecology 1994). Permit Conditions Il.U. (mapping) and II.V. (marking) of the HF RCRA Permit, Dangerous Waste (OW) Portion, require the mapping and marking of dangerous waste underground pipelines subject to the provisions of the Washington Administrative Code (WAC) Chapter 173-303. Permit Condition Il.U.I. requires the submittal of a report describing the methodology used to generate pipeline maps and to assure their quality. Though not required by the Permit, this report also documents the approach used for the field marking of dangerous waste underground pipelines.

  8. Characterization Plan for Soils Around Drain Line PLA-100115

    Energy Technology Data Exchange (ETDEWEB)

    D. Shanklin

    2006-05-24

    This Characterization Plan supports the Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) closure of soils that may have been contaminated by releases from drain line PLA-100115, located within the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory Site. The requirements to address the closure of soils contaminated by a potential release from this line in a characterization plan was identified in the "HWMA/RCRA Less Than 90-day Generator Closure Report for the VES-SFE-126."

  9. Environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This document presents an Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG 6) at Oak Ridge National Laboratory (ORNL). This document updates a draft monitoring plan developed in 1993. The draft plan was never finalized awaiting resolution of the mechanisms for addressing RCRA concerns at a site where the CERCLA process resulted in a decision to defer action, i.e., postpone closure indefinitely. Over the past two years the Tennessee Department of Environment and Conservation (TDEC), US Department of Energy (DOE), and US Environmental Protection Agency (EPA) Region IV, have agreed that RCRA authority at the site will be maintained through a post- closure permit; ''closure'' in this case referring to deferred action. Both a Revised Closure Plan (DOE 1995a) and a Post-Closure Permit Application (DOE 1995b) have been developed to document this agreement; relevant portions of the EMP will be included in the RCRA Post-Closure Permit Application. As the RCRA issues were being negotiated, DOE initiated monitoring at WAG 6. The purpose of the monitoring activities was to (1) continue to comply with RCRA groundwater quality assessment requirements, (2) install new monitoring equipment, and (3) establish the baseline conditions at WAG 6 against which changes in contaminant releases could be measured. Baseline monitoring is scheduled to end September 30, 1995. Activities that have taken place over the past two years are summarized in this document

  10. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  11. The implications of RCRA [Resource Conservation and Recovery Act] regulation for the disposal of transuranic and high-level waste

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Sharples, F.E.; Smith, E.D.

    1988-01-01

    In May of 1987 the Department of Energy (DOE) published a rule interpreting the definition of ''byproduct'' under the Atomic Energy Act. This byproduct rule clarified the role of the Resource Conservation and Recovery Act (RCRA) in the regulation of DOE's radioactive waste management activities. According to the rule, only the radioactive portion of DOE's mixed radioactive and hazardous waste (mixed waste), including mixed transuranic (TRU) and high-level waste (HLW), is exempt from RCRA under the byproduct exemption. The portion of a waste that is hazardous as defined by RCRA is subject to full regulation under RCRA. Because the radioactive and hazardous portions of m any, if not most, DOE wastes are likely to be inseparable, the rule in effect makes most mixed wastes subject to dual regulation. The potential application of RCRA to facilities such as the Waste Isolation Pilot Plant (WIPP) and the HLW repository creates unique challenges for both the DOE and regulatory authorities. Strategies must be developed to assure compliance with RCRA without either causing excessive administrative burdens or abandoning the goal of minimizing radiation exposure. This paper will explore some of the potential regulatory options for and recent trends in the regulation of TRU and HLW under RCRA

  12. Selective removal/recovery of RCRA metals from waste and process solutions using polymer filtration trademark technology

    International Nuclear Information System (INIS)

    Smith, B.F.

    1997-01-01

    Resource Conservation and Recovery Act (RCRA) metals are found in a number of process and waste streams at many DOE, U.S. Department of Defense, and industrial facilities. RCRA metals consist principally of chromium, mercury, cadmium, lead, and silver. Arsenic and selenium, which form oxyanions, are also considered RCRA elements. Discharge limits for each of these metals are based on toxicity and dictated by state and federal regulations (e.g., drinking water, RCRA, etc.). RCRA metals are used in many current operations, are generated in decontamination and decommissioning (D ampersand D) operations, and are also present in old process wastes that require treatment and stabilization. These metals can exist in solutions, as part of sludges, or as contaminants on soils or solid surfaces, as individual metals or as mixtures with other metals, mixtures with radioactive metals such as actinides (defined as mixed waste), or as mixtures with a variety of inert metals such as calcium and sodium. The authors have successfully completed a preliminary proof-of-principle evaluation of Polymer Filtration trademark (PF) technology for the dissolution of metallic mercury and have also shown that they can remove and concentrate RCRA metals from dilute solutions for a variety of aqueous solution types using PF technology. Another application successfully demonstrated is the dilute metal removal of americium and plutonium from process streams. This application was used to remove the total alpha contamination to below 30 pCi/L for the wastewater treatment plant at TA-50 at Los Alamos National Laboratory (LANL) and from nitric acid distillate in the acid recovery process at TA-55, the Plutonium Facility at LANL (ESP-CP TTP AL16C322). This project will develop and optimize the PF technology for specific DOE process streams containing RCRA metals and coordinate it with the needs of the commercial sector to ensure that technology transfer occurs

  13. Selective removal/recovery of RCRA metals from waste and process solutions using polymer filtration{trademark} technology

    Energy Technology Data Exchange (ETDEWEB)

    Smith, B.F. [Los Alamos National Lab., NM (United States)

    1997-10-01

    Resource Conservation and Recovery Act (RCRA) metals are found in a number of process and waste streams at many DOE, U.S. Department of Defense, and industrial facilities. RCRA metals consist principally of chromium, mercury, cadmium, lead, and silver. Arsenic and selenium, which form oxyanions, are also considered RCRA elements. Discharge limits for each of these metals are based on toxicity and dictated by state and federal regulations (e.g., drinking water, RCRA, etc.). RCRA metals are used in many current operations, are generated in decontamination and decommissioning (D&D) operations, and are also present in old process wastes that require treatment and stabilization. These metals can exist in solutions, as part of sludges, or as contaminants on soils or solid surfaces, as individual metals or as mixtures with other metals, mixtures with radioactive metals such as actinides (defined as mixed waste), or as mixtures with a variety of inert metals such as calcium and sodium. The authors have successfully completed a preliminary proof-of-principle evaluation of Polymer Filtration{trademark} (PF) technology for the dissolution of metallic mercury and have also shown that they can remove and concentrate RCRA metals from dilute solutions for a variety of aqueous solution types using PF technology. Another application successfully demonstrated is the dilute metal removal of americium and plutonium from process streams. This application was used to remove the total alpha contamination to below 30 pCi/L for the wastewater treatment plant at TA-50 at Los Alamos National Laboratory (LANL) and from nitric acid distillate in the acid recovery process at TA-55, the Plutonium Facility at LANL (ESP-CP TTP AL16C322). This project will develop and optimize the PF technology for specific DOE process streams containing RCRA metals and coordinate it with the needs of the commercial sector to ensure that technology transfer occurs.

  14. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  15. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  16. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  17. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  18. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  19. INEL RCRA [Resource Conservation and Recovery Act] permit for incineration of hazardous waste: Status report

    International Nuclear Information System (INIS)

    McFee, J.N.; Dalton, J.D.; Bohrer, H.A.

    1987-01-01

    The Waste Experimental Reduction Facility (WERF) was constructed to reduce the volume of low-level radioactive waste at the Idaho National Engineering Laboratory (INEL). To address the problem of radioactively contaminated ignitable hazardous waste resulting from INEL activities, a development program was carried out to evaluate WERF's ability to meet the regulated criteria for incinerating liquid and solid ignitable waste. Concurrently, INEL submitted its hazardous waste Part B application under the Resource Conservation and Recovery Act (RCRA). As required, and as a major step in the permitting process, the WERF incinerator portion of the permit application included a proposed trial burn, which is a demonstration test of the incinerator's ability to destroy hazardous materials. The trial burn plan was designed to demonstrate the system performance for liquid and solid ignitable wastes at three operating conditions, using a prepared mix of materials representative of waste to be processed. EPA Region X reviewed and commented on the plan prior to the trial burn. Results of the liquid feed trial burn showed a greater than 97% probability of meeting the RCRA-dictated DRE value for chlorinated solvents and a greater than 99% probability for nonchlorinated solvents. Nonchlorinated solid waste results were calculated at a 93% probability of meeting the required DRE, with a 75% probability for chlorinated solid wastes. In addition, the incinerator DRE continued to improve long after the assumed pre-test equilibrium period had ended. The trial burn demonstrates that the WERF incinerator can safely and adequately destroy ignitable hazardous and mixed waste and provides a significant enhancement of the INEL's waste management system

  20. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  1. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  2. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  3. Transportable Vitrification System RCRA Closure Practical Waste Disposition Saves Time And Money

    International Nuclear Information System (INIS)

    Brill, Angie; Boles, Roger; Byars, Woody

    2003-01-01

    The Transportable Vitrification System (TVS) was a large-scale vitrification system for the treatment of mixed wastes. The wastes contained both hazardous and radioactive materials in the form of sludge, soil, and ash. The TVS was developed to be moved to various United States Department of Energy (DOE) facilities to vitrify mixed waste as needed. The TVS consists of four primary modules: (1) Waste and Additive Materials Processing Module; (2) Melter Module; (3) Emissions Control Module; and (4) Control and Services Module. The TVS was demonstrated at the East Tennessee Technology Park (ETTP) during September and October of 1997. During this period, approximately 16,000 pounds of actual mixed waste was processed, producing over 17,000 pounds of glass. After the demonstration was complete it was determined that it was more expensive to use the TVS unit to treat and dispose of mixed waste than to direct bury this waste in Utah permitted facility. Thus, DOE had to perform a Resource Conservation and Recovery Act (RCRA) closure of the facility and find a reuse for as much of the equipment as possible. This paper will focus on the following items associated with this successful RCRA closure project: TVS site closure design and implementation; characterization activities focused on waste disposition; pollution prevention through reuse; waste minimization efforts to reduce mixed waste to be disposed; and lessons learned that would be integrated in future projects of this magnitude

  4. Glossary of CERCLA, RCRA and TSCA related terms and acronyms. Environmental Guidance

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    This glossary contains CERCLA, RCRA and TSCA related terms that are most often encountered in the US Department of Energy (DOE) Environmental Restoration and Emergency Preparedness activities. Detailed definitions are included for key terms. The CERCLA definitions included in this glossary are taken from the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as amended and related federal rulemakings. The RCRA definitions included in this glossary are taken from the Resource Conservation and Recovery Act (RCRA) and related federal rulemakings. The TSCA definitions included in this glossary are taken from the Toxic Substances and Control Act (TSCA) and related federal rulemakings. Definitions related to TSCA are limited to those sections in the statute and regulations concerning PCBs and asbestos.Other sources for definitions include additional federal rulemakings, assorted guidance documents prepared by the US Environmental Protection Agency (EPA), guidance and informational documents prepared by the US Department of Energy (DOE), and DOE Orders. The source of each term is noted beside the term. Terms presented in this document reflect revised and new definitions published before July 1, 1993.

  5. Obtaining variances from the treatment standards of the RCRA Land Disposal Restrictions

    International Nuclear Information System (INIS)

    1990-05-01

    The Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDRs) [40 CFR 268] impose specific requirements for treatment of RCRA hazardous wastes prior to disposal. Before the LDRs, many hazardous wastes could be land disposed at an appropriately designed and permitted facility without undergoing treatment. Thus, the LDRs constitute a major change in the regulations governing hazardous waste. EPA does not regulate the radioactive component of radioactive mixed waste (RMW). However, the hazardous waste component of an RMW is subject to RCRA LDR regulations. DOE facilities that manage hazardous wastes (including radioactive mixed wastes) may have to alter their waste-management practices to comply with the regulations. The purpose of this document is to aid DOE facilities and operations offices in determining (1) whether a variance from the treatment standard should be sought and (2) which type (treatability or equivalency) of petition is appropriate. The document also guides the user in preparing the petition. It shall be noted that the primary responsibility for the development of the treatability petition lies with the generator of the waste. 2 figs., 1 tab

  6. Soil Management Plan for the Oak Ridge Y-12 National Security Complex Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-03-02

    This Soil Management Plan applies to all activities conducted under the auspices of the National Nuclear Security Administration (NNSA) Oak Ridge Y-12 National Security Complex (Y-12) that involve soil disturbance and potential management of waste soil. The plan was prepared under the direction of the Y-12 Environmental Compliance Department of the Environment, Safety, and Health Division. Soil disturbances related to maintenance activities, utility and building construction projects, or demolition projects fall within the purview of the plan. This Soil Management Plan represents an integrated, visually oriented, planning and information resource tool for decision making involving excavation or disturbance of soil at Y-12. This Soil Management Plan addresses three primary elements. (1) Regulatory and programmatic requirements for management of soil based on the location of a soil disturbance project and/or the regulatory classification of any contaminants that may be present (Chap. 2). Five general regulatory or programmatic classifications of soil are recognized to be potentially present at Y-12; soil may fall under one or more these classifications: (a) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) pursuant to the Oak Ridge Reservation (ORR) Federal Facilities Agreement; (b) Resource Conservation and Recovery Act (RCRA); (c) RCRA 3004(u) solid waste managements units pursuant to the RCRA Hazardous and Solid Waste Amendments Act of 1984 permit for the ORR; (d) Toxic Substances and Control Act-regulated soil containing polychlorinated biphenyls; and (e) Radiologically contaminated soil regulated under the Atomic Energy Act review process. (2) Information for project planners on current and future planned remedial actions (RAs), as prescribed by CERCLA decision documents (including the scope of the actions and remedial goals), land use controls implemented to support or maintain RAs, RCRA post-closure regulatory requirements for

  7. Superfund TIO videos. Set A. Regulatory overview - CERCLA's relationship to other programs: RCRA, Title III, UST, CWA, SDWA. Part 1. Audio-Visual

    International Nuclear Information System (INIS)

    1990-01-01

    The videotape is divided into five sections. Section 1 provides definitions and historical information on both the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The four types of RCRA regulatory programs - Subtitles C, D, I, and J - are described. Treatment, storage, and disposal (TSD) and recycling facilities are also discussed. Section 2 discusses the history behind the Emergency Planning and Community Right-to-Know Act (Title III). The four major provisions of Title III, which are emergency planning, emergency release notification, community right-to-know reporting, and the toxic chemical release inventory are covered. Section 3 outlines the UST program covering notification, record keeping, and the UST Trust Fund. Section 4 outlines the six major provisions of the Clean Water Act (CWA): water quality, pretreatment, prevention of oil and hazardous substance discharges, responses to oil and hazardous substance discharges, discharges of hazardous substances into the ocean, and dredge and fill. Section 5 explains the purpose, regulations, and standards of the Safe Drinking Water Act (SDWA). Specific issues such as underground injection, sole source aquifers, and lead contamination are discussed

  8. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  9. RFI/RI work plan for the Road A Chemical Basin 904-111G

    International Nuclear Information System (INIS)

    Kmetz, T.F.

    2000-01-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities

  10. RFI/RI work plan for the Road A Chemical Basin 904-111G

    Energy Technology Data Exchange (ETDEWEB)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  11. 30 CFR 46.4 - Training plan implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Training plan implementation. 46.4 Section 46.4..., SURFACE CLAY, COLLOIDAL PHOSPHATE, OR SURFACE LIMESTONE MINES. § 46.4 Training plan implementation. (a... accordance with the written training plan; (2) Presented by a competent person; and (3) Presented in language...

  12. Resource Conservation and Recovery Act Industrial Sites quality assurance project plan: Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    1994-06-01

    This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans

  13. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  14. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  15. Transuranic (TRU) Waste Phase I Retrieval Plan

    CERN Document Server

    McDonald, K M

    2000-01-01

    From 1970 to 1987, TRU and suspect TRU wastes at Hanford were placed in the SWBG. At the time of placement in the SWBG these wastes were not regulated under existing Resource Conservation and Recovery Act (RCRA) regulations, since they were generated and disposed of prior to the effective date of RCRA at the Hanford Site (1987). From the standpoint of DOE Order 5820.2A1, the TRU wastes are considered retrievably stored, and current plans are to retrieve these wastes for shipment to WIPP for disposal. This plan provides a strategy for the Phase I retrieval that meets the intent of TPA milestone M-91 and Project W-113, and incorporates the lessons learned during TRU retrieval campaigns at Hanford, LANL, and SRS. As in the original Project W-113 plans, the current plan calls for examination of approximately 10,000 suspect-TRU drums located in the 218-W-4C burial ground followed by the retrieval of those drums verified to contain TRU waste. Unlike the older plan, however, this plan proposes an open-air retrieval ...

  16. Opportunity costs of implementing forest plans

    Science.gov (United States)

    Fox, Bruce; Keller, Mary Anne; Schlosberg, Andrew J.; Vlahovich, James E.

    1989-01-01

    Intellectual concern with the National Forest Management Act of 1976 has followed a course emphasizing the planning aspects of the legislation associated with the development of forest plans. Once approved, however, forest plans must be implemented. Due to the complex nature of the ecological systems of interest, and the multiple and often conflicting desires of user clientele groups, the feasibility and costs of implementing forest plans require immediate investigation. For one timber sale on the Coconino National Forest in Arizona, forest plan constraints were applied and resulting resource outputs predicted using the terrestrial ecosystem analysis and modeling system (TEAMS), a computer-based decision support system developed at the School of Forestry, Northern Arizona University, With forest plan constraints for wildlife habitat, visual diversity, riparian area protection, and soil and slope harvesting restrictions, the maximum timber harvest obtainable was reduced 58% from the maximum obtainable without plan constraints.

  17. RCRA materials analysis by laser-induced breakdown spectroscopy: Detection limits in soils

    International Nuclear Information System (INIS)

    Koskelo, A.; Cremers, D.A.

    1994-01-01

    The goal of the Technical Task Plan (TTP) that this report supports is research, development, testing and evaluation of a portable analyzer for RCRA and other metals. The instrumentation to be built will be used for field-screening of soils. Data quality is expected to be suitable for this purpose. The data presented in this report were acquired to demonstrate the detection limits for laser-induced breakdown spectroscopy (LIBS) of soils using instrument parameters suitable for fieldable instrumentation. The data are not expected to be the best achievable with the high pulse energies available in laboratory lasers. The report presents work to date on the detection limits for several elements in soils using LIBS. The elements targeted in the Technical Task Plan are antimony, arsenic, beryllium, cadmium, chromium, lead, selenium, and zirconium. Data for these elements are presented in this report. Also included are other data of interest to potential customers for the portable LIBS apparatus. These data are for barium, mercury, cesium and strontium. Data for uranium and thorium will be acquired during the tasks geared toward mixed waste characterization

  18. Low-level mixed waste: An RCRA perspective for NRC licensees

    International Nuclear Information System (INIS)

    1990-08-01

    The publication presents an overview of RCRA requirements for commercially-generated low-level mixed waste. It is designed for Nuclear Regulatory Commission (NRC) licensees who may not be familiar with EPA regulations that apply to their waste products

  19. 76 FR 9706 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-02-22

    ... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...

  20. EPA Linked Open Data: Resource Conservation and Recovery Act Handlers (RCRA)

    Data.gov (United States)

    U.S. Environmental Protection Agency — RCRAInfo is EPA’s comprehensive information system that supports the Resource Conservation and Recovery Act (RCRA) of 1976 and the Hazardous and Solid Waste...

  1. Environmental implementation plan: Chapter 7, Groundwater protection

    International Nuclear Information System (INIS)

    Wells, D.

    1994-01-01

    The Savannah River Site (SRS) uses large quantities of groundwater for drinking, processing, and non-contact cooling. Continued industrial and residential growth along with additional agricultural irrigation in areas adjacent to SRS will increase the demand for groundwater. This increasing demand will require a comprehensive management system to ensure the needed quality and quantity of groundwater is available for all users. The Groundwater Protection Program and the Waste Management Program establish the overall framework for protecting this resource. Ground water under SRS is monitored extensively for radiological, hazardous, and water quality constituents. Groundwater quality is known to have been affected at 33 onsite locations, but none of the contaminant plumes have migrated offsite. Onsite and offsite drinking water supplies are monitored to ensure they are not impacted. The site has more than 1800 monitoring wells from which groundwater samples are analyzed for radiological and non-radiological constituents. SRS is complying with all applicable regulations related to groundwater protection, waste treatment, and waste disposal. The existing waste storage facilities are permitted or are being permitted. Existing hazardous- and mixed-waste storage facilities are being included in the site Resource Conservation and Recovery Act (RCRA) Part B Permit. Part B permitting has been initiated for many of the planned hazardous- and mixed-waste treatment and disposal facilities

  2. Implementing the Climate Action Plan | Climate Neutral Research Campuses |

    Science.gov (United States)

    considerations for building a portfolio, including: Compatibility with organizational mission: All climate NREL Implementing the Climate Action Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered

  3. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  4. Y-12 Plant Groundwater Protection Program: Groundwater and surface water sampling and analysis plan for Calendar Year 1998

    International Nuclear Information System (INIS)

    1997-09-01

    This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 1998 at the Department of Energy (DOE) Y-12 Plant. These monitoring activities are managed by the Y-12 Plant Environmental Compliance Organization through the Y-12 Plant Groundwater Protection Program (GWPP). Groundwater and surface water monitoring during CY 1998 will be performed in three hydrogeologic regimes at the Y-12 Plant: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located within Bear Creek Valley, and the Chestnut Ridge Regime is located south of the Y-12 Plant. Groundwater and surface water monitoring will be performed during CY 1998 to comply with: (1) requirements specified in Resource Conservation and Recover Act (RCRA) post-closure permits regarding RCRA corrective action monitoring and RCRA detection monitoring; (2) Tennessee Department of Environment and Conservation regulations governing detection monitoring at nonhazardous solid waste management facilities; and (3) DOE Order 5400.1 surveillance monitoring and exit pathway monitoring. Data from some of the sampling locations in each regime will be used to meet the requirements of more than one of the monitoring drivers listed above. Modifications to the CY 1998 monitoring program may be necessary during implementation. For example, changes in regulatory requirements may alter the parameters specified for selected monitoring wells, or wells could be removed from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 Plant GWPP manager and documented as addenda to this sampling and analysis plan

  5. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-07-11

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9830-5] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional...

  6. ICPP tank farm closure study. Volume III: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    International Nuclear Information System (INIS)

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option

  7. An analysis of the CERCLA response program and the RCRA corrective action program in determining cleanup strategies for federal facilities which have been proposed for listing on the National Priorities List

    International Nuclear Information System (INIS)

    Baker, P.; Vinson, R.

    1994-01-01

    This document was prepared as an issue paper for the Department of Energy to serve in the decision-making process for environmental restoration activities. The paper compares cleanup requirements under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and those currently proposed under Subpart S of the Resource Conservation and Recovery Act (RCRA). The history and regulatory framework for both laws is discussed, and the process for environmental restoration actions under both regulatory programs is compared and contrasted. Contaminants regulated under CERCLA and RCRA differ significantly in that radioactive contaminants are subject to Environmental Protection Agency jurisdiction only under CERCLA. The DOE has the jurisdiction to implement radioactive waste management and cleanup levels under the Atomic Energy Act (AEA) at nuclear weapons facilities. For sites with significant amounts of contaminants which are radioactive only, cleanup under RCRA can present significant advantages, since the DOE can then manage restoration activities under its own authority. There are, conversely several significant advantages for a remedial action being conducted at a CERCLA site recognized on the National Priorities List (NPL). Other provisions in the CERCLA remediation and the RCRA corrective action process offer both advantages and disadvantages related to DOE environmental restoration programs. This paper presents a discussion of significant issues which should be considered in such negotiations

  8. Rocky Flats Solar Evaporation Ponds RCRA hybrid-closure case study

    International Nuclear Information System (INIS)

    Ogg, R.T.; Everett, L.G.; Cullen, S.J.

    1994-01-01

    The Solar Evaporation Ponds (SEP)/Operable Unit 4 (OU 4), located at the Rocky Flats Plant (RFP) sixteen miles northwest of Denver, Colorado, is currently undergoing remediation/Resource Conservation and Recovery Act (RCRA) closure in accordance with the Rocky Flats Interagency Agreement (IAG) signed by the US Department of Energy (DOE), US Environmental Protection Agency (EPA) and Colorado Department of Health (CDH) on January 22, 1991. Based on the ''Phase 1'' (source and soils) RCRA Facility Investigation/Remedial Investigation (RFM data and interpretations), the DOE and EG and G Rocky Flats, Inc. (EG and G) have selected a permanent surface engineered/isolation barrier as the technological option for remediation of the SEP. The DOE and EG and G will utilize all natural materials to create an ''impermeable'' barrier/structure to isolate the waste being left in place from impacting human health and the environment for a minimum of 1,000 years. Their rationale for utilizing natural materials is two fold; (1) optimize long term performance of the barrier and; (2) design a structure which will be near maintenance free (passive remediation) for 1,000 years. The DOE and EG and G have taken a proactive approach in providing post closure performance assessment for this RCRA closure action. An integrated monitoring system has been designed which will include monitoring the engineered barrier, vadose zone and ground water systems. Rocky Flats will integrate instrumentation into the permanent engineered barrier which will provide early warning of potential liquid migration through the barrier and into the waste zone

  9. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  10. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  11. Environmental permits and approvals plan for high-level waste interim storage, Project W-464

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1998-01-01

    This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464

  12. Fall 2010 Semiannual (III.H. and I.U.) Report for the HWMA/RCRA Post Closure Permit for the INTEC Waste Calcining Facility and the CPP 601/627/640 Facility at the INL Site

    Energy Technology Data Exchange (ETDEWEB)

    Boehmer, Ann

    2010-11-01

    The Waste Calcining Facility is located at the Idaho Nuclear Technology and Engineering Center. In 1999, the Waste Calcining Facility was closed under an approved Hazardous Waste Management Act/Resource Conservation and Recovery Act (HWMA/RCRA) Closure Plan. Vessels and spaces were grouted and then covered with a concrete cap. The Idaho Department of Environmental Quality issued a final HWMA/RCRA post-closure permit on September 15, 2003, with an effective date of October 16, 2003. This permit sets forth procedural requirements for groundwater characterization and monitoring, maintenance, and inspections of the Waste Calcining Facility to ensure continued protection of human health and the environment. The post closure permit also includes semiannual reporting requirements under Permit Conditions III.H. and I.U. These reporting requirements have been combined into this single semiannual report, as agreed between the Idaho Cleanup Project and Idaho Department of Environmental Quality. The Permit Condition III.H. portion of this report includes a description and the results of field methods associated with groundwater monitoring of the Waste Calcining Facility. Analytical results from groundwater sampling, results of inspections and maintenance of monitoring wells in the Waste Calcining Facility groundwater monitoring network, and results of inspections of the concrete cap are summarized. The Permit Condition I.U. portion of this report includes noncompliances not otherwise required to be reported under Permit Condition I.R. (advance notice of planned changes to facility activity which may result in a noncompliance) or Permit Condition I.T. (reporting of noncompliances which may endanger human health or the environment). This report also provides groundwater sampling results for wells that were installed and monitored as part of the Phase 1 post-closure period of the landfill closure components in accordance with HWMA/RCRA Landfill Closure Plan for the CPP-601 Deep

  13. Hazardous Waste Cerification Plan: Hazardous Waste Handling Facility, Lawrence Berkeley Laboratory

    International Nuclear Information System (INIS)

    1992-02-01

    The purpose of this plan is to describe the organization and methodology for the certification of hazardous waste (HW) handled in the Lawrence Berkeley Laboratory (LBL) Hazardous Waste Handling Facility (HWHF). The plan also incorporates the applicable elements of waste reduction, which include both up-front minimization and end- product treatment to reduce the volume and toxicity of the waste; segregation of the waste as it applies to certification; and executive summary of the Quality Assurance Program Plan (QAPP) for the HWHF and a list of the current and planned implementing procedures used in waste certification. The plan provides guidance from the HWHF to waste generators, waste handlers, and the Systems Group Manager to enable them to conduct their activities and carry out their responsibilities in a manner that complies with several requirements of the Federal Resource Conservation and Resource Recovery Act (RCRA), the Federal Department of Transportation (DOT), and the State of California, Code of Regulations (CCR), Title 22

  14. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  15. Guide to ground water remediation at CERCLA response action and RCRA corrective action sites

    International Nuclear Information System (INIS)

    1995-10-01

    This Guide contains the regulatory and policy requirements governing remediation of ground water contaminated with hazardous waste [including radioactive mixed waste (RMW)], hazardous substances, or pollutants/contaminants that present (or may present) an imminent and substantial danger. It was prepared by the Office of Environmental Policy and Assistance, RCRA/CERCLA Division (EH-413), to assist Environmental Program Managers (ERPMs) who often encounter contaminated ground water during the performance of either response actions under CERCLA or corrective actions under Subtitle C of RCRA. The Guide begins with coverage of the regulatory and technical issues that are encountered by ERPM's after a CERCLA Preliminary Assessment/Site Investigation (PA/SI) or the RCRA Facility Assessment (RFA) have been completed and releases into the environment have been confirmed. It is based on the assumption that ground water contamination is present at the site, operable unit, solid waste management unit, or facility. The Guide's scope concludes with completion of the final RAs/corrective measures and a determination by the appropriate regulatory agencies that no further response action is necessary

  16. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  17. 78 FR 60700 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-10-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9901-58-Region 9] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four... Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional Haze...

  18. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  19. RCRA closure of eight land-based units at the Y-12 plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Welch, S.H.

    1988-01-01

    Eight land-based hazardous waste management units at the Oak Ridge Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of risk assessments and the preparation of an integrated schedule

  20. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  1. Work plan, health and safety plan, and site characterization for the Rust Spoil Area (D-106)

    International Nuclear Information System (INIS)

    Bohrman, D.E.; Uziel, M.S.; Landguth, D.C.; Hawthorne, S.W.

    1990-06-01

    As part of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) of the Department of Energy's Y-12 Plant located in Oak Ridge, Tennessee, this work plan has been developed for the Rust Spoil Area (a solid waste disposal area). The work plan was developed by the Measurement Applications and Development Group (MAD) of the Health and Safety Research Division (HASRD) at Oak Ridge National Laboratory (ORNL) and will be implemented jointly by ORNL/MAD and the Y-12 Environmental Surveillance Section. This plan consists of four major sections: (1) a project description giving the scope and objectives of the investigation at the Rust Spoil Area; (2) field and sampling procedures describing sample documentation, soil sampling techniques, sample packaging and preservation, equipment decontamination, and disposal of investigation generated wastes; (3) sample analysis procedures detailing necessary analytical laboratory procedures to ensure the quality of chemical results from sample receipt through analysis and data reporting; and (4) a health and safety plan which describes general site hazards and particular hazards associated with specific tasks, assigns responsibilities, establishes personnel protection standards and mandatory safety procedures, and provides emergency information for contingencies that may arise during the course of field operations

  2. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    International Nuclear Information System (INIS)

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR section 261.4(a)(4), ''Identification and Listing of Hazardous Waste,'' as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues

  3. National spent fuel program preliminary report RCRA characteristics of DOE-owned spent nuclear fuel DOE-SNF-REP-002. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This report presents information on the preliminary process knowledge to be used in characterizing all Department of Energy (DOE)-owned Spent Nuclear Fuel (SNF) types that potentially exhibit a Resource Conservation and Recovery Act (RCRA) characteristic. This report also includes the process knowledge, analyses, and rationale used to preliminarily exclude certain SNF types from RCRA regulation under 40 CFR {section}261.4(a)(4), ``Identification and Listing of Hazardous Waste,`` as special nuclear and byproduct material. The evaluations and analyses detailed herein have been undertaken as a proactive approach. In the event that DOE-owned SNF is determined to be a RCRA solid waste, this report provides general direction for each site regarding further characterization efforts. The intent of this report is also to define the path forward to be taken for further evaluation of specific SNF types and a recommended position to be negotiated and established with regional and state regulators throughout the DOE Complex regarding the RCRA-related policy issues.

  4. 100-D Ponds closure plan. Revision 1

    International Nuclear Information System (INIS)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit is clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure

  5. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  6. Nevada Test Site, site treatment plan 1999 annual update

    International Nuclear Information System (INIS)

    1999-03-01

    A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFC Act) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFC Act Consent Order (CO) dated March 6, 1996, and revised June 15, 1998. The FFC Act CO sets forth stringent regulatory requirements to comply with the implementation of the STP

  7. Nevada Test Site site treatment plan. Final annual update. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    A Site Treatment Plan (STP) is required for facilities at which the US Department of Energy Nevada Operations Office (DOE/NV) generates or stores mixed waste (MW), defined by the Federal Facility Compliance Act (FFCAct) as waste containing both a hazardous waste subject to the Resource Conservation and Recovery Act (RCRA) and a radioactive material subject to the Atomic Energy Act. This STP was written to identify specific treatment facilities for treating DOE/NV generated MW and provides proposed implementation schedules. This STP was approved by the Nevada Division of Environmental Protection (NDEP) and provided the basis for the negotiation and issuance of the FFCAct Consent Order (CO) dated March 6, 1996. The FFCAct CO sets forth stringent regulatory requirements to comply with the implementation of the STP

  8. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  9. Ground-water monitoring under RCRA

    International Nuclear Information System (INIS)

    Coalgate, J.

    1993-11-01

    In developing a regulatory strategy for the disposal of hazardous waste under the Resource Conservation and Recovery Act (RCRA), protection of ground-water resources was the primary goal of the Environmental Protection Agency (EPA). EPA's ground-water protection strategy seeks to minimize the potential for hazardous wastes and hazardous constituents in waste placed in land disposel units to migrate into the environment. This is achieved through liquids management (limiting the placement of liquid wastes in or on the land, requiring the use of liners beneath waste, installing leachate collection systems and run-on and run-off controls, and covering wastes at closure). Ground-water monitoring serves to detect any failure in EPA's liquids management strategy so that ground-water contamination can be detected and addressed as soon as possible

  10. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    International Nuclear Information System (INIS)

    Evans, S. K.

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve 'clean closure' of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems

  11. HWMA/RCRA Closure Plan for the Basin Facility Basin Water Treatment System - Voluntary Consent Order NEW-CPP-016 Action Plan

    Energy Technology Data Exchange (ETDEWEB)

    Evans, S. K.

    2007-11-07

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan for the Basin Water Treatment System located in the Basin Facility (CPP-603), Idaho Nuclear Technology and Engineering Center (INTEC), Idaho National Laboratory Site, was developed to meet future milestones established under the Voluntary Consent Order. The system to be closed includes units and associated ancillary equipment included in the Voluntary Consent Order NEW-CPP-016 Action Plan and Voluntary Consent Order SITE-TANK-005 Tank Systems INTEC-077 and INTEC-078 that were determined to have managed hazardous waste. The Basin Water Treatment System will be closed in accordance with the requirements of the Hazardous Waste Management Act/Resource Conservation and Recovery Act, as implemented by the Idaho Administrative Procedures Act 58.01.05.009 and 40 Code of Federal Regulations 265, to achieve "clean closure" of the tank system. This closure plan presents the closure performance standards and methods of achieving those standards for the Basin Water Treatment Systems.

  12. Implementing Strategic Environmental Assessment of spatial planning tools

    International Nuclear Information System (INIS)

    De Montis, Andrea

    2013-01-01

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage

  13. The marriage of RCRA and CERCLA at the Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Shelton, D.C.; Brooks, L.M.

    1998-01-01

    A key goal of the Rocky Flats Cleanup Agreement (RFCA) signed in July of 1996 was to provide a seamless marriage of the Resource Conservation and Recovery Act (RCRA) (and other media specific programs) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) and the implementing agencies of each. This paper examines the two years since the signing of RFCA and identifies the successes, failures, and stresses of the marriage. RFCA has provided an excellent vehicle for regulatory and substantive progress at the Department of Energy's Rocky Flats facility. The key for a fully successful marriage is to build on the accomplishments to date and to continually improve the internal and external systems and relationships. To date, the parties can be proud of both the substantial accomplishment of substantive environmental work and the regulatory systems that have enabled the work

  14. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  15. ORGDP RCRA/PCB

    International Nuclear Information System (INIS)

    Rodgers, T.

    1986-01-01

    A dual purpose solid/liquid incinerator is currently being constructed at the Oak Ridge Gaseous Diffusion Plant [ORGDP (K-25)] to destroy uranium contaminated, hazardous organic wastes in compliance with the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). These wastes are generated by the gaseous diffusion plants in Oak Ridge, TN; Paducah, KY; and Portsmouth, OH. In addition, waste will also be received from the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the Feed Materials Production Center (FMPC). Destruction of PCBs and hazardous liquid organic wastes will be accomplished in a rotary kiln incinerator with an afterburner. This system was selected after a study of various alternatives which are covered in Report No. X-OE-141. Incineration was chosen because it is dependable, permanent, detoxifies organics, and reduces volume. The rotary kiln incinerator was selected because it can thermally destroy organic constituents of liquids, solids, and sludges to produce an organically inert ash. The incineration system, off-gas treatment system, and related instrumentation and controls are being provided by International Waste Energy Systems (IWES) which is responsible for design, construction, startup, and performance testing

  16. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  17. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  18. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  19. Self-assembled monolayers on mosoporous supports (SAMMS) for RCRA metal removal

    Energy Technology Data Exchange (ETDEWEB)

    Feng, Xiangdong; Liu, Jun; Fryxell, G. [Pacific Northwest National Lab., Richland, WA (United States)

    1997-10-01

    The Mixed Waste Focus Area has declared mercury removal and stabilization as the first and fourth priorities among 30 prioritized deficiencies. Resource Conservation and Recovery Act (RCRA) metal and mercury removal has also been identified as a high priority at DOE sites such as Albuquerque, Idaho Falls, Oak Ridge, Hanford, Rocky Flats, and Savannah River. Under this task, a proprietary new technology, Self-Assembled Monolayers on Mesoporous Supports (SAMMS), for RCRA metal ion removal from aqueous wastewater and mercury removal from organic wastes such as vacuum pump oils is being developed at Pacific Northwest National Laboratory (PNNL). The six key features of the SAMMS technology are (1) large surface area (>900 m{sup 2}/g) of the mesoporous oxides (SiO{sub 2}, ZrO{sub 2}, TiO{sub 2}) ensures high capacity for metal loading (more than 1 g Hg/g SAMMS); (2) molecular recognition of the interfacial functional groups ensures the high affinity and selectivity for heavy metals without interference from other abundant cations (such as calcium and iron) in wastewater; (3) suitability for removal of mercury from both aqueous wastes and organic wastes; (4) the Hg-laden SAMMS not only pass TCLP tests, but also have good long-term durability as a waste form because the covalent binding between mercury and SAMMS has good resistance to ion exchange, oxidation, and hydrolysis; (5) the uniform and small pore size (2 to 40 nm) of the mesoporous silica prevents bacteria (>2000 nm) from solubilizing the bound mercury; and (6) SAMMS can also be used for RCRA metal removal from gaseous mercury waste, sludge, sediment, and soil.

  20. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  1. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  2. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    Science.gov (United States)

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  3. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Science.gov (United States)

    2010-07-01

    ... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding), the... is determined. (2) If EPA disapproves a submitted control strategy implementation plan revision...

  4. Proposed plan for the Tank 105-C Hazardous Waste Management Facility. Revision 1

    International Nuclear Information System (INIS)

    Miles, W.C. Jr.

    1994-01-01

    This Proposed Plan was developed to describe the remedial action selected at the Tank 105-C Hazardous Waste Management Facility (HWMF) source-specific unit within the C-Area Fundamental Study Area (FSA) at the Savannah River Site (SRS) and to fulfill Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. This 8,400 gallon capacity tank was certified and accepted closed according to a closure plan approved by the state of South Carolina under the Resource Conservation and Recovery Act (RCRA) authority in January 1991. As a result of the closure, previously performed under RCRA, the unit poses no current or potential threat to human health or the environment. Accordingly, no further remedial action is necessary under CERCLA

  5. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  6. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, ''General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs

  7. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  8. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  9. PLANNING THE IMPLEMENTATION OF QUALITY THROUGH STRATEGY FORMULATION AND CORPORATE GOVERNANCE

    Directory of Open Access Journals (Sweden)

    Nikola Stefanović

    2007-09-01

    Full Text Available Planning the implementation of quality is a complex process that depends on many different internal and external factors. Planning the implementation is defined by the capabilities of management to visualize the market position of the company and to evaluate the company's strengths, weaknesses, opportunities, and threats. Serving to the company's purposes, planning the implementation of quality must be integrated into the company's strategic objectives and then transferred to other parts of the organization utilizing the corporate governance system. Planning the implementation, as a part of strategy formulation, should be reflected in: 1 company's vision and mission development, 2 goals setting, 3 strategy development aimed at achieving goals, 4 implementation and execution of the strategy, and 4 monitoring, evaluation, control, and readjustment of the strategy. Finally, planning must account for all possible implementation barriers.

  10. Exiting RCRA Subtitle C regulation data for supporting a new regulatory path for immobilized mixed debris

    Energy Technology Data Exchange (ETDEWEB)

    Porter, C.L. [Jetseal, Inc., Idaho Falls, ID (United States); Carson, S.D.; Cheng, Wu-Ching [Sandia National Labs., Albuquerque, NM (United States)

    1995-12-31

    This paper presents analytical and empirical data that provide technical support for the position that mixed debris (debris contaminated with both radioactive and hazardous constituents) treated by immobilization in accordance with 40 CFR 268.45 can exit RCRA Subtitle C requirements at the time the treatment is complete. Pathways analyses and risk assessments of low-level waste and RCRA mixed waste disposal facilities show that these two types of facilities provide equivalent long-term (> 100 years) performance and protection of human health and the environment. A proposed two-tier approach for waste form performance criteria is discussed.

  11. Performance test results of noninvasive characterization of RCRA surrogate waste by prompt gamma neutron activation analysis

    International Nuclear Information System (INIS)

    Gehrke, R.J.; Propp, W.A.

    1997-11-01

    A performance evaluation to determine the feasibility of using prompt gamma neutron activation analysis (PGNAA) for noninvasive, quantitative assay of mixed waste containers was sponsored by DOE's Office of Technology Development (OTD), the Mixed Waste Focus Area (MWFA), and the Idaho National Engineering and Environmental Laboratory (INEEL). The evaluation was conducted using a surrogate waste, based on Portland cement, that was spiked with three RCRA metals, mercury, cadmium, and lead. The results indicate that PGNAA has potential as a process monitor. However, further development is required to improve its sensitivity to meet regulatory requirements for determination of these RCRA metals

  12. Implementation impacts of PRL methodology

    International Nuclear Information System (INIS)

    Caudill, J.A.; Krupa, J.F.; Meadors, R.E.; Odum, J.V.; Rodrigues, G.C.

    1993-02-01

    This report responds to a DOE-SR request to evaluate the impacts from implementation of the proposed Plutonium Recovery Limit (PRL) methodology. The PRL Methodology is based on cost minimization for decisions to discard or recover plutonium contained in scrap, residues, and other plutonium bearing materials. Implementation of the PRL methodology may result in decisions to declare as waste certain plutonium bearing materials originally considered to be a recoverable plutonium product. Such decisions may have regulatory impacts, because any material declared to be waste would immediately be subject to provisions of the Resource Conservation and Recovery Act (RCRA). The decision to discard these materials will have impacts on waste storage, treatment, and disposal facilities. Current plans for the de-inventory of plutonium processing facilities have identified certain materials as candidates for discard based upon the economic considerations associated with extending the operating schedules for recovery of the contained plutonium versus potential waste disposal costs. This report evaluates the impacts of discarding those materials as proposed by the F Area De-Inventory Plan and compares the De-Inventory Plan assessments with conclusions from application of the PRL. The impact analysis was performed for those materials proposed as potential candidates for discard by the De-Inventory Plan. The De-Inventory Plan identified 433 items, containing approximately 1% of the current SRS Pu-239 inventory, as not appropriate for recovery as the site moves to complete the mission of F-Canyon and FB-Line. The materials were entered into storage awaiting recovery as product under the Department's previous Economic Discard Limit (EDL) methodology which valued plutonium at its incremental cost of production in reactors. An application of Departmental PRLs to the subject 433 items revealed that approximately 40% of them would continue to be potentially recoverable as product plutonium

  13. Results of RCRA groundwater quality assessment at the 216-B-3 Pond Facility

    International Nuclear Information System (INIS)

    Barnett, D.B.; Teel, S.S.

    1997-06-01

    This document describes a groundwater quality assessment of the 216-B-3 pond system, a Resources Conservation and Recovery act of 1976 (RCRA) waste facility. In 1990, sampling and chemical analysis of groundwater underlying the facility indicated that the contamination indicator parameters, total organic halogens (TOX), and total organic carbon (TOC) had exceeded established limits in two wells. This discovery placed the facility into RCRA groundwater assessment status and subsequently led to a more detailed hydrochemical analysis of groundwater underlying the facility. Comprehensive chemical analyses of groundwater samples from 1994 through 1996 revealed one compound, tris (2-chloroethyl) phosphate (TRIS2CH), that may have contributed to elevated TOX concentrations. No compound was identified as a contributor to TOC. Detailed evaluations of TOX, TOC, and TRIS2CH and comparison of occurrences of these parameters led to conclusions that (1) with few exceptions, these constituents occur at low concentrations below or near limits of quantitation; (2) it is problematic whether the low concentrations of TRIS2CH represent a contaminant originating from the facility or if it is a product of well construction; and (3) given the low and diminishing concentration of TOX, TOC, and TRIS2CH, no further investigation into the occurrent of these constituents is justified. Continued groundwater monitoring should include an immediate recalculation of background critical means of upgradient/downgradient comparisons and a return to seminannual groundwater monitoring under a RCRA indicator parameter evaluation program

  14. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  15. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... a high overall implementation performance, both in terms of changes in energy supply and emission reductions, these metrics are only partially linked. It also shows that inconsistencies between the system scope of the base year emissions and goal attainment, due to the use of offsetting, may lead...

  16. Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

  17. Safeguard Measures for Implementation of New Round of Land Consolidation Planning

    Institute of Scientific and Technical Information of China (English)

    LI Chen; LIU Xin-feng; PENG Zhe; SI Tao

    2012-01-01

    We conduct a comprehensive analysis of the current situation of security system for implementation of China’s land consolidation planning. The prominent problems in the process of implementing safeguard measures for planning are summarized as follows: the guiding ideology for planning formulation is imperfect; the legal basis is weak, and administrative means are not sound; the economic security mechanism is not brought into full play, and the social security measures still need to be further deepened; the technical safeguard measures are short. From laws and regulations, administrative management, economic security, social supervision, technology management and other aspects, we establish the scientific security system for implementation of land consolidation planning; put forth the recommendations for guaranteeing the implementation of planning in China.

  18. 76 FR 76158 - Agency Information Collection Activities; Proposed Collection; Comment Request; RCRA Expanded...

    Science.gov (United States)

    2011-12-06

    ... contents of the docket, and to access those documents in the public docket that are available..., including through the use of appropriate automated electronic, mechanical, or other technological collection... as State, local, or Tribal governments. Title: RCRA Expanded Public Participation. ICR numbers: EPA...

  19. RCRA land unit closures at the Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Welch, S.H.; Kelly, B.A.; Delozier, M.F.P.; Manrod, W.E.

    1987-01-01

    Eight land-based hazardous waste management units at the Y-12 Plant are being closed under an integrated multi-year program. Closure plans for the units have been submitted and are in various stages of revision and regulatory review. These units will be closed by various combinations of methods, including liquid removal and treatment, sludge stabilization, contaminated sludge and/or soil removal, and capping. The closure of these sites will be funded by a new Department of Energy budget category, the Environmental Restoration Budget Category (ERBC), which is intended to provide greater flexibility in the response to closure and remedial activities. A major project, Closure and Post-Closure Activities (CAPCA), has been identified for ERBC funding to close and remediate the land units in accordance with RCRA requirements. Establishing the scope of this program has required the development of a detailed set of assumptions and a confirmation program for each assumption. Other significant activities in the CAPCA program include the development of risk assessments and the preparation of an integrated schedule

  20. Preparation of radioactive ''mixed'' waste samples for measurement of RCRA [Resource Conservation and Recovery Act] organic compounds

    International Nuclear Information System (INIS)

    Tomkins, B.A.; Caton, J.E.

    1987-01-01

    A radioactive ''mixed'' waste typically contains alpha-, beta-, or gamma-emitting radionuclides and varying quantities of semivolatile or volatile organic species, some or all of which may be named specifically by the Resource Conservation and Recovery Act (RCRA). Because there are no acceptable means available currently for disposing of these mixed wastes, they are presently stored above-ground in sealed drums. For this reason, analytical procedures which can determine RCRA organics in radioactive waste are necessary for deciding the proper approach for disposal. An important goal of this work is the development of methods for preparing mixed waste samples in a manner which allows the RCRA organics to be measured in conventional organic analysis laboratories without special precautions. Analytical procedures developed for handling mixed waste samples must satisfy not only the usual constraints present in any trace-level organic chemical determination, but also those needed to insure the protection of the operator from radioactive contamination. Consequently, procedures should be designed to use the least amount of radioactive sample commensurate with achieving acceptable sensitivity with the RCRA analytical methods. Furthermore, the unusual laboratory glassware which would normally be used should be replaced with disposable materials wherever possible, in order to reduce the ''clean-up'' time required, and thereby reduce the operator's exposure to radioactivity. Actual sample handling should be reduced to the absolute minimum. Finally, the final isolate must exhibit a sufficiently low level of alpha, beta, or gamma activity to permit detailed characterization in a conventional organic analysis laboratory. 4 refs., 5 tabs

  1. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  2. Land Use Control Implementation Plan

    Science.gov (United States)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  3. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  4. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  5. Columbia River impact evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    As a result of past practices, four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. To accomplish the timely cleanup of the past-practice units, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), was signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE). To support the Tri-Party Agreement, milestones were adopted. These milestones represent the actions needed to ensure acceptable progress toward Hanford Site compliance with CERCLA, RCRA, and the Washington State Hazardous Waste Management Act of 1976. This report was prepared to fulfill the requirement of Tri-Party Agreement Milestone M-30-02, which requires a plan to determine cumulative health and environmental impacts to the Columbia River. This plan supplements the CERCLA remedial investigations/feasibility studies (RI/FS) and RCRA facility investigations/corrective measures studies (RFI/CMSs) that will be undertaken in the 100 Area. To support the plan development process, existing information was reviewed and a preliminary impact evaluation based on this information was performed. The purpose of the preliminary impact evaluation was to assess the adequacy of existing data and proposed data collection activities. Based on the results of the evaluation, a plan is proposed to collect additional data or make changes to existing or proposed data collection activities.

  6. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  7. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    Science.gov (United States)

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  8. Liquid effluent retention facility final-status groundwater monitoring plan

    International Nuclear Information System (INIS)

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure

  9. Gen IV Materials Handbook Implementation Plan

    International Nuclear Information System (INIS)

    Rittenhouse, P.; Ren, W.

    2005-01-01

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  10. An example of system integration for RCRA policy analysis

    International Nuclear Information System (INIS)

    Tonn, B.; Goeltz, R.; Schmidt, K.

    1991-01-01

    This paper describes the synthesis of various computer technologies and software systems used on a project to estimate the costs of remediating Solid Waste Management Units (SWMUs) that fall under the corrective action provisions of the Resource Conservation and Recovery Act (RCRA). The project used two databases collected by Research Triangle Institute (RTI) that contain information on SWMUs and a PC-based software system called CORA that develops cost estimates for remediating SWMUs. The project team developed rules to categorize every SWMU in the databases by the kinds of technologies required to clean them up. These results were input into CORA, which estimated costs associated with the technologies. Early on, several computing challenges presented themselves. First, the databases have several hundred thousand records each. Second, the categorization rules could not be written to cover all combinations of variables. Third, CORA is run interactively and the analysis plan called for running CORA tens of thousands of times. Fourth, large data transfers needed to take place between RTI and Oak Ridge National Laboratory. Solutions to these problems required systems integration. SWMU categorization was streamlined by using INTERNET as was the data transfer. SAS was used to create files used by a program called SuperKey that was used to run CORA. Because the analysis plan required the generation of hundreds of thousands of cost estimates, memory management software was needed to allow the portable IBM P70 to do the job. During the course of the project, several other software packages were used, including: SAS System for Personal Computers (SAS/PC), DBase III, LOTUS 1-2-3, PIZAZZ PLUS, LOTUS Freelance Plus, and Word Perfect. Only the comprehensive use of all available hardware and software resources allowed this project to be completed within the time and budget constraints. 5 refs., 3 figs., 3 tabs

  11. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  12. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  13. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  14. Special Focus Areas for Hazardous Waste Cleanups under the Resource Conservation and Recovery Act (RCRA)

    Science.gov (United States)

    In order to manage the new and changing needs of the RCRA Corrective Action Program, EPA is constantly exploring program enhancements, alternate exposure pathways, and new technologies available to protect human health and environment.

  15. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  16. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  17. 76 FR 41424 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-07-14

    ... modeling requirement for this SIP call should allow for the use of the modeling protocol developed by Iowa... is making a finding that the Iowa State Implementation Plan (SIP) is substantially inadequate to... ) in Muscatine County, Iowa. The specific SIP deficiencies needing revision are described below. EPA is...

  18. CY2003 RCRA GROUNDWATER MONITORING WELL SUMMARY REPORT

    International Nuclear Information System (INIS)

    MARTINEZ, C.R.

    2003-01-01

    This report describes the calendar year (CY) 2003 field activities associated with the installation of two new groundwater monitoring wells in the A-AX Waste Management Area (WMA) and four groundwater monitoring wells in WMA C in the 200 East Area of the Hanford Nuclear Reservation. All six wells were installed by Fluor Hanford Inc. (FH) for CH2M Hill Hanford Group, Inc. (CHG) in support of Draft Hanford Facility Agreement and Consent Order (Tri-Party Agreement) M-24-00 milestones and ''Resource Conservation and Recovery Act of 1976'' (RCRA) groundwater monitoring requirements. Drilling data for the six wells are summarized in Table 1

  19. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  20. Optimized planning methodologies of ASON implementation

    Science.gov (United States)

    Zhou, Michael M.; Tamil, Lakshman S.

    2005-02-01

    Advanced network planning concerns effective network-resource allocation for dynamic and open business environment. Planning methodologies of ASON implementation based on qualitative analysis and mathematical modeling are presented in this paper. The methodology includes method of rationalizing technology and architecture, building network and nodal models, and developing dynamic programming for multi-period deployment. The multi-layered nodal architecture proposed here can accommodate various nodal configurations for a multi-plane optical network and the network modeling presented here computes the required network elements for optimizing resource allocation.

  1. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  2. Lead State Implementation Plan (SIP) Checklist Guide

    Science.gov (United States)

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the lead air emissions standard.

  3. U.S. Department of Energy defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Jordan, E.A.

    1988-01-01

    The Program Implementation Plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  4. Hanford Site Guide for Preparing and Maintaining Fenerator Group Pollution Prevention Program Documentation

    International Nuclear Information System (INIS)

    PLACE, B.G.

    1999-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention/Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 1998a) and Prime Contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and (300501) (RCRA and EPA, 1994). Documentation guidance for the following five P2/WMin elements are discussed: Fiscal Year (FY) Goals; Budget and Staffing; Waste Minimization (WMinn ) Assessments (WMAs); Pollution Prevention (P2) Reporting; WMin Certification

  5. Cleanups In My Community (CIMC) - RCRA and Base Realignment and Closure (BRAC) Federal Facilities, National Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data layer provides access to Resource Conservation and Recovery Act (RCRA) Base Realignment and Closure (BRAC) sites as part of the CIMC web service. The...

  6. Dewatering and RCRA partial closure action on solar evaporation ponds, Rocky Flats Plant, Golden, Colorado

    International Nuclear Information System (INIS)

    1991-06-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (DOE/EA-0487) on its proposal to partially close five solar evaporation ponds at the Rocky Flats Plant (RFP) pursuant to the requirements of the Resource Conservation and Recovery Act (RCRA). This proposal would be known as a RCRA partial closure and would be accomplished by dewatering the ponds, where necessary, and converting any remaining sludge or evaporator concentrate to a solid wasteform (pondcrete and saltcrete). The pond sites would be stabilized to prevent erosion or other disturbance to the soil and to prevent infiltration of rain or snowmelt. The solid wasteform would be transported offsite for disposal. The five solar ponds (designated 207-A, 207-B (north, center, and south), and 207-C), are the only solar evaporation ponds that exist at the RFP. A finding of no significant impact is included

  7. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  8. U.S. Department of Energy, defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Chee, T.

    1988-01-01

    This paper reports that the program implementation plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  9. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Science.gov (United States)

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  10. Update of the Used Fuel Dispositon Campaign Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    McMahon, Kevin A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bragg-Sitton, Shannon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mackinnon, Robert James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter N. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Birkholzer, Jens T. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  11. NASA Education Implementation Plan 2015-2017

    Science.gov (United States)

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  12. Environmental restoration and remediation technical data management plan

    International Nuclear Information System (INIS)

    Key, K.T.; Fox, R.D.

    1994-02-01

    The tasks performed in the Remedial Investigation/Feasibility Study (RI/FS) work plan for each Hanford Site operable unit must meet the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al 1992). An extensive amount of data will be generated in the evaluation and remediation of hazardous waste sites at the Site. The data must be of sufficient quality, as they will be used to evaluate the need, select the method(s), and support the full remediation of the waste sites as stipulated in the Tri-Party Agreement. In particular, a data management plan (DMP) is to be included in an RI/FS work plan for managing the technical data obtained during the characterization of an operable unit, as well as other data related to the study of the operable unit. Resource Conservation and Recovery Act of 1976 (RCRA) sites are involved in the operable unit. Thus, the data management activities for the operable unit should be applied consistently to RCRA sites in the operable unit as well. This DMP provides common direction for managing-the environmental technical data of all defined operable units at the Hanford Site during the RI/FS activities. Details specific to an operable unit will be included in the actual work plan of that operable unit

  13. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  14. Impacts of proposed RCRA regulations and other related federal environmental regulations on fossil fuel-fired facilities: Final report, Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    Estimation of the costs associated with implementation of the Resource Conservation and Recovery Act (RCRA) regulations for non-hazardous and hazardous material disposal in the utility industry are provided. These costs are based on engineering studies at a number of coal-fired power plants in which the costs for hazardous and non-hazardous disposal are compared to the costs developed for the current practice design for each utility. The relationship of the three costs is displayed. The emphasis of this study is on the determination of incremental costs rather than the absolute costs for each case (current practice, non-hazardous, or hazardous). For the purpose of this project, the hazardous design cost was determined for minimum versus maximum compliance.

  15. Sampling and analysis plan for the 100-D Ponds voluntary remediation project

    International Nuclear Information System (INIS)

    1996-08-01

    This Sampling and Analysis Plan (SAP) describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds Resource Conservation and Recovery Act (RCRA) treatment, storage, and/or disposal (TSD) unit. This SAP includes the Field Sampling Plan (FSP) presented in Section 2.0, and the Quality Assurance Project Plan (QAPjP) described in Section 3.0. The FSP defines the sampling and analytical methodologies to be performed, and the QAPjP provides or includes information on the requirements for precision, accuracy, representativeness, comparability, and completeness of the analytical data. This sampling and analysis plan was developed using the Environmental Protection Agency's Seven-Step Data Quality Objectives (DQO) Guidance (EPA, 1994). The purpose of the DQO meetings was (1) to identify the contaminants of concern and their cleanup levels under the Washington State Model Toxics Control Act (MTCA, WAC-173-340) Method B, and (2) to determine the number and locations of samples necessary to verify that the 100-D Ponds meet the cleanup criteria. The data collected will be used to support RCRA closure of this TSD unit

  16. Fiscal year 1990 Rocky Flats Plant environmental restoration program current-year work plan

    International Nuclear Information System (INIS)

    Nielsen, T.; Waage, E.; Miller, D.

    1990-01-01

    This paper reports on the FY90 Current Year Work Plan (CYWP), intended to serve as a guiding document with which the Environmental Restoration and RCRA Compliance programs will be implemented at the Rocky Flats Plant, The Current Year Work Plan document serves to provide in one single document any cross-references necessary to understand how the DOE Five Year Plan, Site Specific Plan, or any other related documents fit into the Current Year Work Plan for the Rocky Flats Environmental Restoration. The scope of this paper will compare the planned Fiscal Year 1990 environmental restoration activities to those actually achieved at the end of the fiscal year. The DOE Headquarters (HQ) issued the Environmental Restoration and Waste Management (ER/WM) Five-Year Plan (FYP). The purpose of the FYP is to establish an agenda for compliance and cleanup against which progress will be measured. The Five Year Plan has been updated to include the Colorado Department of Health (CDH), Evironmental Protection Agency (EPA), and Department of Energy (DOE) Inter Agency Agreement Environmental Restoration activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. It also addresses facilities and sites contaminated with or used in the management of those wastes

  17. Strategic Planning for Hot Cell Closure

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2001-01-01

    The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to be located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping, and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adequate attention to detail when the situation required contributed to the process credibility and a successful plan

  18. Planning and implementation of nuclear research programmes

    International Nuclear Information System (INIS)

    Lopes, J.L.

    1986-01-01

    The planning and implementation of nuclear research programmes in developed and developing countries is discussed. The main aspects of these programmes in USA, France, Japan, India and Brazil are reported. (M.W.O.) [pt

  19. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  20. Bahasa Indonesia: Policy, Implementation, and Planning

    Directory of Open Access Journals (Sweden)

    Risa R. Simanjuntak

    2009-05-01

    Full Text Available Language policy or language planning is still in the surge for familiarity and importance. However, this paper argues that in the case of Bahasa Indonesia current implementations should be evaluated based on its relevance and future plan. The historical perspectives will reveal the roots of the current policy and therefore make foundations for further discussions. From the study of literature, this paper is arguing that new paradigm for nationalism, roles in the global competition, as well as regional languages as competitive advantage could be well adopted to nurture a more inclusive and progressive Bahasa Indonesia.  

  1. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  2. EG and G Idaho environmental protection implementation plan

    International Nuclear Information System (INIS)

    Stump, R.C.

    1989-11-01

    This report describes the EG ampersand G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.0 Additionally, this report is intended to supplement the Department of Energy -- Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 3 figs., 1 tab

  3. Planning for implementation in a volunteer process

    International Nuclear Information System (INIS)

    Tweed, Cherry

    2014-01-01

    The framework for implementing geological disposal of the UK's higher activity radioactive wastes is laid out in the Managing Radioactive Waste Safely (MRWS) White Paper published by the UK Government in June 2008. The process to site a facility is to be staged and based on voluntarism and partnership with local communities. This process is in its early stages and this paper outlines the work being undertaken by the Nuclear Decommissioning Authority's Radioactive Waste Management Directorate (NDA-RWMD), the implementing body for geological disposal in the UK, to plan, along with others, how to deal with the waste and get it safely underground. It describes how the work programme has been developed, how the safety is demonstrated, how to provide packaging advice and develop the organisation. The processes used to build confidence in these plans are also presented

  4. Planning and Preparation for CD-ROM Implementation: The Citadel Library.

    Science.gov (United States)

    Maynard, J. Edmund

    Management guidelines for library planning and a strategic planning program profile based on the literature were used in the planning process for implementing access to databases on CD-ROM at the Daniel Library of the Citadel, Military College of South Carolina. According to this model, the planning process would consist of five stages: (1)…

  5. Increasing In-Service Teacher Implementation of Classroom Management Practices through Consultation, Implementation Planning, and Participant Modeling

    Science.gov (United States)

    Hagermoser Sanetti, Lisa M.; Williamson, Kathleen M.; Long, Anna C. J.; Kratochwill, Thomas R.

    2018-01-01

    Numerous evidence-based classroom management strategies to prevent and respond to problem behavior have been identified, but research consistently indicates teachers rarely implement them with sufficient implementation fidelity. The purpose of this study was to evaluate the effectiveness of implementation planning, a strategy involving logistical…

  6. Coordination of groundwater activities in the 100 N Area

    International Nuclear Information System (INIS)

    Hartman, M.J.

    1995-09-01

    The initiation of the N Springs Expedited Response Action (ERA) in the 100 N Area will affect the groundwater monitoring networks of two Resource Conservation and Recovery Act of 1976 (RCRA) units. The 1301-N and 325-N facilities are treatment, storage, or disposal (TSD) units that have been monitored under RCRA since 1987. In September 1994, the Washington State Department of Ecology issued an action memorandum, instructing the US Department of Energy (DOE) to take the action. The planned pump-and-treat system will preclude meeting the specific objectives of interim-status RCRA groundwater monitoring representative samples and detect adverse impacts of the TSD units on. However, under RCRA final-status requirements, which will be implemented in 1999, corrective action for groundwater contamination will probably be required. The US Environmental Protection Agency (EPA) has declared parity between RCRA corrective action and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 remedial action decisions. The 1301-N and 1325-N facilities are still in interim-status and therefore are not in the category of ''RCRA corrective action.'' However, DOE's position is that parity exists between RCRA and the ERA because RCRA corrective action will almost certainly be required in the future

  7. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. Its applicability covers 24 inactive uranium mill tailings sites and approximately 8000 vicinity properties, no two of which are alike. This diversity dictates the more general approach of this plan. In practice, however, site-specific application will be implemented and will require extensive consultation with the appropriate state or tribe and the NRC. In addition, information concerning relevant Federal, state, or tribal standards and regulations will be considered along with any data that may assist in the evaluations. Throughout this process, DOE will encourage state and tribal participation to ensure that compliance with the EPA standards will be achieved

  8. A review of state regulations that exceed those of the federal Resource Conservation and Recovery Act (RCRA)

    International Nuclear Information System (INIS)

    Coutant, C.C.; Heckman, C.L.

    1988-04-01

    This report identifies and provides information on state hazardous waste management programs and regulations in states where the US Department of Energy (DOE) has facilities. The objective is to describe for the DOE defense program and its contractors how state requirements are more stringent than the federal regulations under the Resource Conservation and Recovery Act (RCRA). DOE defense programs are located in 13 of the 50 states. Most of these states have regulations that are essentially equivalent to the federal RCRA requirements as they existed prior to the 1984 amendments, but their regulations are, in most instances, more stringment than the federal requirements. Differences are both substantive and procedural, and they are summarized and tabulated herein. All but three of these 13 states have been granted Final Authorization from the US Environmental Protection Agency (EPA) to operate their own hazardous waste management program in accord with the federal RCRA program prior to the 1984 amendments; two of the three others have some stage of Interim Authorization. EPA currently administers all of the provisions of the 1984 amendments, including requirements for corrective action under Sect. 3004(u). Two states, Colorado and Tennessee, have been granted revisions to their Final Authorizations delegating responsibility for the hazardous wastes. Responsible state agencies (with appropriate telephone numbers) are indicated, as are the relevant laws and current regulatory statutes

  9. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  10. Evaluation of the effectiveness of the implementation of power plans in Kenya

    Energy Technology Data Exchange (ETDEWEB)

    Ruwah, N.; Chang, C., E-mail: ndumzilla@email.kings.ac.kr, E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-07-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  11. Evaluation of the effectiveness of the implementation of power plans in Kenya

    International Nuclear Information System (INIS)

    Ruwah, N.; Chang, C.

    2014-01-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  12. Comparative analysis of elements and models of implementation in local-level spatial plans in Serbia

    Directory of Open Access Journals (Sweden)

    Stefanović Nebojša

    2017-01-01

    Full Text Available Implementation of local-level spatial plans is of paramount importance to the development of the local community. This paper aims to demonstrate the importance of and offer further directions for research into the implementation of spatial plans by presenting the results of a study on models of implementation. The paper describes the basic theoretical postulates of a model for implementing spatial plans. A comparative analysis of the application of elements and models of implementation of plans in practice was conducted based on the spatial plans for the local municipalities of Arilje, Lazarevac and Sremska Mitrovica. The analysis includes four models of implementation: the strategy and policy of spatial development; spatial protection; the implementation of planning solutions of a technical nature; and the implementation of rules of use, arrangement and construction of spaces. The main results of the analysis are presented and used to give recommendations for improving the elements and models of implementation. Final deliberations show that models of implementation are generally used in practice and combined in spatial plans. Based on the analysis of how models of implementation are applied in practice, a general conclusion concerning the complex character of the local level of planning is presented and elaborated. [Project of the Serbian Ministry of Education, Science and Technological Development, Grant no. TR 36035: Spatial, Environmental, Energy and Social Aspects of Developing Settlements and Climate Change - Mutual Impacts and Grant no. III 47014: The Role and Implementation of the National Spatial Plan and Regional Development Documents in Renewal of Strategic Research, Thinking and Governance in Serbia

  13. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    Science.gov (United States)

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  14. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Management

    2010-07-19

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  15. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    International Nuclear Information System (INIS)

    2010-01-01

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  16. Smart meter implementation plan : report of the Board to the Minister

    International Nuclear Information System (INIS)

    2005-01-01

    This report provides detailed information about Ontario's smart meter implementation plan. The smart metering system will measure how much electricity a customer uses on an hourly basis, with data being transferred daily to local electricity distributors. Energy prices will vary according to the time of day when energy was being consumed, a system that supports current methods of charging larger customers. The plan proposes that all new and existing customers in Ontario have some type of smart meter by 2010 as part of a two-phased plan. Customers will receive timely information on consumption, and distributors will offer variable pricing plans. It was advised that costs be included in the distribution rate immediately upon installation of smart meters. Detailed information on implementation, smart metering costs, minimum requirements, and non-commodity time of use rates were presented. Critical tasks for establishing a framework for implementation included: ministerial approval of the plan; identification of a program coordinator; the establishment of a correct regulatory framework; a vendor approval process requiring appropriate permissions for radio frequency licences; technology pilots on behalf of distributors to assure adequate adaptation and the development of procedures concerning procurement, internal schedules and deployment; coordination between government, regulatory bodies and distributors towards the establishment of communication strategies, implementation plans and distributor approaches. 5 tabs., 6 figs

  17. Hanford Site guide for preparing and maintaining generator group pollution prevention program documentation

    International Nuclear Information System (INIS)

    Place, B.G.

    1998-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 1998a) and Prime contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994). Documentation guidance for the following five P2/WMin elements are discussed: Fiscal Year (FY) Goals; Budget and Staffing; Waste Minimization (WMin) Assessments (WMAs); Quarterly Pollution Prevention (P2) Reporting WMin Certification

  18. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan.

  19. Streamlined approach for environmental restoration plan for corrective action unit 430, buried depleted uranium artillery round No. 1, Tonopah test range

    International Nuclear Information System (INIS)

    1996-09-01

    This plan addresses actions necessary for the restoration and closure of Corrective Action Unit (CAU) No. 430, Buried Depleted Uranium (DU) Artillery Round No. 1 (Corrective Action Site No. TA-55-003-0960), a buried and unexploded W-79 Joint Test Assembly (JTA) artillery test projectile with high explosives (HE), at the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Tonopah Test Range (TTR) in south-central Nevada. It describes activities that will occur at the site as well as the steps that will be taken to gather adequate data to obtain a notice of completion from Nevada Division of Environmental Protection (NDEP). This plan was prepared under the Streamlined Approach for Environmental Restoration (SAFER) concept, and it will be implemented in accordance with the Federal Facility Agreement and Consent Order (FFACO) and the Resource Conservation and Recovery Act (RCRA) Industrial Sites Quality Assurance Project Plan

  20. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  1. Transuranic Storage Area (TSA)-2 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Lodman, D.W.; Spry, M.J.; Nolte, E.P.; Barry, G.A.

    1992-11-01

    This document describes the proposed plans for closure of the Transuranic Storage Area (TSA)-2 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. Future plans for the unit include incorporating the earthen-covered portion of the TSA-2 pad into a TSA retrieval enclosure along with the TSA-1 and TSAR pads, and closure of the portion of the TSA-2 pad under the Air Support Weather Shield (ASWS-2). This plan addresses closure of the ASWS-2 by decontaminating structures and equipment that may have contacted the waste. Sufficient sampling and documentation of all closure activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  2. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jungers, D.K.

    1993-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

  3. Implementation of BNCT treatment planning procedures

    International Nuclear Information System (INIS)

    Capala, J.; Ma, R.; Diaz, A.Z.; Chanana, A.D.; Coderre, J.A.

    2001-01-01

    Estimation of radiation doses delivered during boron neutron capture therapy (BNCT) requires combining data on spatial distribution of both the thermal neutron fluence and the 10 B concentration, as well as the relative biological effectiveness of various radiation dose components in the tumor and normal tissues. Using the treatment planning system created at Idaho National Engineering and Environmental Laboratory and the procedures we had developed for clinical trials, we were able to optimize the treatment position, safely deliver the prescribed BNCT doses, and carry out retrospective analyses and reviews. In this paper we describe the BNCT treatment planning process and its implementation in the ongoing dose escalation trials at Brookhaven National Laboratory. (author)

  4. A framework to assess plan implementation maturity with an application to flood management in Vietnam

    NARCIS (Netherlands)

    Phi, Ho Long; Hermans, L.M.; Douven, W.J.A.M.; Halsema, Van G.E.; Khan, Malik Fida

    2015-01-01

    Implementation failure is a long-known Achilles’ heel of water and flood management plans. Contemporary planning approaches address the implementation challenge by using more participatory planning processes to ensure support for plans, assuming that this support will also benefit plan

  5. Sampling and analysis plan for sampling of liquid waste streams generated by 222-S Laboratory Complex operations

    International Nuclear Information System (INIS)

    Benally, A.B.

    1997-01-01

    This Sampling and Analysis Plan (SAP) establishes the requirements and guidelines to be used by the Waste Management Federal Services of Hanford, Inc. personnel in characterizing liquid waste generated at the 222-S Laboratory Complex. The characterization process to verify the accuracy of process knowledge used for designation and subsequent management of wastes consists of three steps: to prepare the technical rationale and the appendix in accordance with the steps outlined in this SAP; to implement the SAP by sampling and analyzing the requested waste streams; and to compile the report and evaluate the findings to the objectives of this SAP. This SAP applies to portions of the 222-S Laboratory Complex defined as Generator under the Resource Conservation and Recovery Act (RCRA). Any portion of the 222-S Laboratory Complex that is defined or permitted under RCRA as a treatment, storage, or disposal (TSD) facility is excluded from this document. This SAP applies to the liquid waste generated in the 222-S Laboratory Complex. Because the analytical data obtained will be used to manage waste properly, including waste compatibility and waste designation, this SAP will provide directions for obtaining and maintaining the information as required by WAC173-303

  6. Bird Conservation Planning and Implementation in Canada's Intermountain Region

    Science.gov (United States)

    Ilia Hartasanchez; Krista De Groot; Andre Breault; Rob W. Butler

    2005-01-01

    Bird conservation planning in British Columbia and Yukon has been carried out by each of the major bird initiatives. The purpose of this paper is to provide a status report of planning activities and to discuss how integration of the initiatives is being accomplished for efficient and effective implementation of bird conservation actions.

  7. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  8. 76 FR 15 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2011-01-03

    ... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading... revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and...

  9. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  10. ORGDP RCRA/PCB incinerator facility

    International Nuclear Information System (INIS)

    Rogers, T.

    1987-01-01

    A dual purpose solid/liquid incinerator is currently being constructed at the Oak Ridge Gaseous Diffusion Plant [ORGDP (K-25)] to destroy uranium contaminated, hazardous organic wastes in compliance with the Toxic Substances Control Act (TSCA) and the Resource Conservation and Recovery Act (RCRA). These wastes are generated by the gaseous diffusion plants in Oak Ridge, TN; Paducah, KY; and Portsmouth, OH. In addition, waste will also be received from the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the Feed Materials Production Center (FMPC). Destruction of PCBs and hazardous liquid organic wastes will be accomplished in a rotary kiln incinerator with an afterburner. This system was selected faster a study of various alternatives. Incineration was chosen because it is dependable, permanent, detoxifies organics, and reduces volume. The rotary kiln incinerator was selected because it can thermally destroy organic constituents of liquids, solids, and sludges to produce an organically inert ash. In addition to the incineration off-gas treatment system, the facility includes a tank farm, drum storage buildings, a solids preparation area, a control room, and a data management system. The incineration system, off-gas treatment system, and related instrumentation and controls are being provided by International Waste Energy Systems (IWES) which is responsible for design, construction, startup, and performances testing

  11. Remedial investigation plan for Waste Area Grouping 1 at Oak Ridge National Laboratory, Oak Ridge, Tennessee: Responses to regulator comments

    International Nuclear Information System (INIS)

    1991-05-01

    This document, ES/ER-6 ampersand D2, is a companion document to ORNL/RAP/Sub-87/99053/4 ampersand R1, Remedial Investigation Plan for ORNL Waste Area Grouping 1, dated August 1989. This document lists comments received from the Environmental Protection Agency, Region 4 (EPA) and the Tennessee Department of Health and Environment (TDHE) and responses to each of these comments. As requested by EPA, a revised Remedial Investigation (RI) Plan for Waste Area Grouping (WAG) 1 will not be submitted. The document is divided into two Sections and Appendix. Section I contains responses to comments issued on May 22, 1990, by EPA's Region 4 program office responsible for implementing the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Section 2 contains responses to comments issued on April 7, 1989, by EPA's program office responsible for implementing the Resource Conservation and Recovery Act (RCRA); these comments include issues raised by the TDHE. The Appendix contains the attachments referenced in a number of the responses. 35 refs

  12. Project Management Plan for the Idaho National Engineering Laboratory Waste Isolation Pilot Plant Experimental Test Program

    International Nuclear Information System (INIS)

    Connolly, M.J.; Sayer, D.L.

    1993-11-01

    EG ampersand G Idaho, Inc. and Argonne National Laboratory-West (ANL-W) are participating in the Idaho National Engineering Laboratory's (INEL's) Waste Isolation Pilot Plant (WIPP) Experimental Test Program (WETP). The purpose of the INEL WET is to provide chemical, physical, and radiochemical data on transuranic (TRU) waste to be stored at WIPP. The waste characterization data collected will be used to support the WIPP Performance Assessment (PA), development of the disposal No-Migration Variance Petition (NMVP), and to support the WIPP disposal decision. The PA is an analysis required by the Code of Federal Regulations (CFR), Title 40, Part 191 (40 CFR 191), which identifies the processes and events that may affect the disposal system (WIPP) and examines the effects of those processes and events on the performance of WIPP. A NMVP is required for the WIPP by 40 CFR 268 in order to dispose of land disposal restriction (LDR) mixed TRU waste in WIPP. It is anticipated that the detailed Resource Conservation and Recovery Act (RCRA) waste characterization data of all INEL retrievably-stored TRU waste to be stored in WIPP will be required for the NMVP. Waste characterization requirements for PA and RCRA may not necessarily be identical. Waste characterization requirements for the PA will be defined by Sandia National Laboratories. The requirements for RCRA are defined in 40 CFR 268, WIPP RCRA Part B Application Waste Analysis Plan (WAP), and WIPP Waste Characterization Program Plan (WWCP). This Project Management Plan (PMP) addresses only the characterization of the contact handled (CH) TRU waste at the INEL. This document will address all work in which EG ampersand G Idaho is responsible concerning the INEL WETP. Even though EG ampersand G Idaho has no responsibility for the work that ANL-W is performing, EG ampersand G Idaho will keep a current status and provide a project coordination effort with ANL-W to ensure that the INEL, as a whole, is effectively and

  13. Revised ground-water monitoring compliance plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    1986-09-01

    This document contains ground-water monitoring plans for a mixed waste storage facility located on the Hanford Site in southeastern Washington State. This facility has been used since 1973 for storage of mixed wastes, which contain both chemicals and radionuclides. The ground-water monitoring plans presented here represent revision and expansion of an effort in June 1985. At that time, a facility-specific monitoring program was implemented at the 183-H Basins as part of the regulatory compliance effort being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interimstatus facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The program initially implemented for the 183-H Basins was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. This effort, named the RCRA Compliance Ground-Water Monitoring Project for the 183-H Basins, was implemented. A supporting project involving ground-water flow modeling for the area surrounding the 183-H Basins was also initiated during 1985. Those efforts and the results obtained are described in subsequent chapters of this document. 26 refs., 55 figs., 14 tabs

  14. Planned change or emergent change implementation approach and nurses' professional clinical autonomy.

    Science.gov (United States)

    Luiking, Marie-Louise; Aarts, Leon; Bras, Leo; Grypdonck, Maria; van Linge, Roland

    2017-11-01

    Nurses' clinical autonomy is considered important for patients' outcome and influenced by the implementation approach of innovations. Emergent change approach with participation in the implementation process is thought to increase clinical autonomy. Planned change approach without this participation is thought not to increase clinical autonomy. Evidence of these effects on clinical autonomy is however limited. To examine the changes in clinical autonomy and in personal norms and values for a planned change and emergent change implementation of an innovation, e.g. intensive insulin therapy. Prospective comparative study with two geographically separated nurses' teams on one intensive care unit (ICU), randomly assigned to the experimental conditions. Data were collected from March 2008 to January 2009. Pre-existing differences in perception of team and innovation characteristics were excluded using instruments based on the innovation contingency model. The Nursing Activity Scale was used to measure clinical autonomy. The Personal Values and Norms instrument was used to assess orientation towards nursing activities and the Team Learning Processes instrument to assess learning as a team. Pre-implementation the measurements did not differ. Post-implementation, clinical autonomy was increased in the emergent change team and decreased in the planned change team. The Personal Values and Norms instrument showed in the emergent change team a decreased hierarchic score and increased developmental and rational scores. In the planned change team the hierarchical and group scores were increased. Learning as a team did not differ between the teams. In both teams there was a change in clinical autonomy and orientation towards nursing activities, in line with the experimental conditions. Emergent change implementation resulted in more clinical autonomy than planned change implementation. If an innovation requires the nurses to make their own clinical decisions, an emergent change

  15. Enterprise resource planning in a large construction firm: Implementation analysis

    NARCIS (Netherlands)

    Voordijk, Johannes T.; van Leuven, Arjen; Laan, Albertus

    2003-01-01

    In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures

  16. 78 FR 48326 - Partial Disapproval of State Implementation Plan; Arizona; Regional Haze Requirements

    Science.gov (United States)

    2013-08-08

    ... Disapproval of State Implementation Plan; Arizona; Regional Haze Requirements AGENCY: Environmental Protection... behalf of National Parks Conservation Association, Sierra Club, Physicians for Social Responsibility... Haze State Implementation Plan Revision submitted by the Arizona Department of Environmental Quality on...

  17. EG and G Idaho Environmental Protection Implementation Plan (1990)

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  18. EG and G Idaho Environmental Protection Implementation Plan (1991)

    Energy Technology Data Exchange (ETDEWEB)

    Graham, J.F.

    1991-11-01

    This report describes the EG G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  19. EG and G Idaho Environmental Protection Implementation Plan (1991)

    International Nuclear Information System (INIS)

    Graham, J.F.

    1991-11-01

    This report describes the EG ampersand G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab

  20. Systems engineering implementation plan for the liquid effluents services program

    International Nuclear Information System (INIS)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described

  1. Implementing the leadership development plans of faculty education fellows: a structured approach.

    Science.gov (United States)

    Goldman, Ellen F; Wesner, Marilyn; Karnchanomai, Ornpawee; Haywood, Yolanda

    2012-09-01

    The literature about medical education faculty fellowship programs, which have grown in popularity, quantifies program characteristics, provides exemplars, and reports on delivery strategies. Evaluation is generally limited to satisfaction measures, with a few longitudinal studies of postprogram achievements, but none on the process of making these changes.The authors describe the development of faculty members' postfellowship leadership plans and a structured process to support plan implementation. They also compare the implementation of initiatives specified in individual leadership development plans of two cohorts of faculty. The participants were graduates of a fellowship program at the George Washington University School of Medicine and Health Sciences. One cohort participated in a structured process of monthly reciprocal peer coaching, followed by journaling and quarterly interviews with the program director; a second cohort functioned as a comparison with no structured process supporting them. (Study years are not provided because they could inadvertently lead to the identification of the participants.) Despite similar implementation challenges expressed by both cohorts, the cohort participating in the structured process implemented 23% more of their planned initiatives, including 2 times as many educational leadership initiatives and 3.5 times as many initiatives related to developing new curriculum. The combination of plan development, reciprocal peer coaching, journaling, and interview discussions provided faculty with focus, structure, and personal support. This structured process supporting leadership plan development and implementation can be easily transferred to other fellowship programs in medical education, adapted for use with residents and fellows, and used in similar development programs.

  2. Quarterly report of RCRA groundwater monitoring data for period April 1 through June 30, 1994

    International Nuclear Information System (INIS)

    1994-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and ''Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities,'' as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company manages RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. This quarterly report contains data received between May 20 and August 19, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter but also data from earlier sampling events that were not previously reported

  3. A RCRA clean closure of a unique site - Kerr Hollow quarry at the Y-12 Plant

    International Nuclear Information System (INIS)

    Stone, J.E.; Yemington, C.

    1991-01-01

    An abandoned rock quarry, Kerr Hollow Quarry (KHQ), near the DOE Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, was used from 1951-1988 as a site to treat RCRA wastes which were reactive, corrosive, or ignitable and which posed major concerns for personnel safety. The wastes were generated from operations at the Y-12 Plant and Oak Ridge National Laboratory and were previously treated by allowing the wastes to react with the water in KHQ. When closure of the site was required by the RCRA regulations, a closure method was selected to allow for clean closure of the quarry without treatment or removal of the water in KHQ. The method proposed to and approved by the Tennessee Department of Health and Environment (TDHE) was one of surveying the containers in the quarry by a submersible Remotely Operated Vehicle (ROV) using sonar and visually inspecting the containers by camera to confirm that all containers are breached and empty. Any container found intact would be breached to allow the contents to react with water and form non-hazardous residue. The progress of this unique type of closure is presented along with a summary of the problems encountered, planning activities, equipment utilized and other information about the closure. All work was done with remotely operated equipment. This work is being performed by Sonsub, Inc. This closure project showed the practicality and cost benefits of telerobotic systems for work on hazardous waste sites. In addition to the intangible benefit of reduced exposure of workers, insurance costs are much lower and efficiency is higher. Daily start-up time is reduced since there is no need to don protective suits or other gear. Productivity is higher since personnel work only in clean areas where they are not hampered by protective gear. Cleanup time at shift end is minimized since the remote equipment does not leave the hazardous area and personnel need not go through decontamination

  4. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    Science.gov (United States)

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  5. Enterprise resource planning in construction: An evaluation of recent implementations

    NARCIS (Netherlands)

    Leuven, A.; Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    In a large number of construction firms, Enterprise Resource Planning (ERP) systems have replaced non-integrated information systems by integrated and maintainable software. The implementation of ERP systems in the construction industry is a difficult task. So far, ERP implementations have yielded

  6. Development and implementation of the compensation plan for pharmacy services in Alberta, Canada.

    Science.gov (United States)

    Breault, Rene R; Whissell, Jeff G; Hughes, Christine A; Schindel, Theresa J

    To describe experiences with development and implementation of a compensation plan for pharmacy services delivered by pharmacists in community pharmacies. Community pharmacy practice in Alberta, Canada. Pharmacists in Alberta have one of the most progressive scopes of practice in North America. They have authority to prescribe drugs independently, administer drugs by injection, access electronic health records, and order laboratory tests. A publicly funded compensation plan for pharmacy services was implemented in 2012. Principles that guided development of the compensation plan aimed to 1) ensure payment for pharmacy services, 2) support pharmacists in using their full scope of practice, 3) enable the development of long-term relationships with patients, 4) facilitate expansion of services delivered by pharmacists, and 5) provide access to pharmacy services for all eligible Albertans. Services covered by the compensation plan include care planning, prescribing, and administering drugs by injection. The guiding principles were used to evaluate experiences with the compensation plan. Claims for pharmacy services covered by the compensation plan increased from 30,000 per month in July 2012 to 170,000 per month in March 2016. From September 2015 to August 2016, 1226 pharmacies submitted claims for services provided by 3901 pharmacists. The number of pharmacists with authorization to prescribe and administer injections continued to increase following implementation of the plan. Alberta's experiences with the development and implementation of the compensation plan will be of interest to jurisdictions considering implementation of remunerated pharmacy services. The potential impact of the plan on health and economic outcomes, in addition to the value of the services as perceived by the public, patients, pharmacists, and other health care providers, should also be explored. Crown Copyright © 2017. Published by Elsevier Inc. All rights reserved.

  7. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  8. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  9. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  10. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  11. 2016-2020 Strategic Plan and Implementing Framework

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  12. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7

  13. Problems in implementation of the spatial plan of the Republic of Srpska until 2015: Quantitative analysis

    Directory of Open Access Journals (Sweden)

    Bijelić Branislav

    2017-01-01

    Full Text Available The implementation of spatial plans in the Republic of Srpska is certainly the weakest phase of the process of spatial planning in this entity. It is particularly evident in the case of the Spatial Plan of the Republic of Srpska until 2015 which is the highest strategic spatial planning document in the Republic of Srpska. More precisely, the implementation of spatial plans has been defined as the carrying out of spatial planning documents, i.e. planning propositions as defined in the spatial plans. For the purpose of this paper, a quantitative analysis of the implementation of the planning propositions envisioned by this document has been carried out. The difference between what was planned and what was implemented at the end of the planning period (ex-post evaluation of planning decisions is presented in this paper. The weighting factor is defined for each thematic field and planning proposition, where the main criterion for determining the weighting factor is the share of the planning proposition and thematic field in the estimated total costs of the plan (financial criterion. The paper has also tackled the issue of the implementation of the Spatial Plan of Bosnia and Herzegovina for the period 1981 - 2000, as well as of the Spatial Plan of the Republic of Srpska 1996 - 2001 - Phased Plan for the period 1996 - 2001, as the previous strategic spatial planning documents of the highest rank covering the area of the Republic of Srpska. The research results have proven primary hypothesis of the paper that the level of the implementation of Spatial Plan of the Republic of Srpska until 2015 is less than 10%.

  14. MRP (materiel requirements planning) II implementation: a case study.

    Science.gov (United States)

    Sheldon, D

    1994-05-01

    Manufacturing resource planning (MRP II) is a powerful and effective business planning template on which to build a continuous improvement culture. MRP II, when successfully implemented, encourages a disciplined yet nonthreatening environment centered on measurement and accountability. From the education that accompanies an MRP II implementation, the employees can better understand the vision and mission of the organization. This common goal keeps everyone's energy directed toward the same final objective. The Raymond Corporation is a major materiels handling equipment manufacturer headquartered in Greene, New York, with class "A" MRP II manufacturing facilities in Greene and Brantford, Ontario and an aftermark distribution facility in East Syracuse, New York. Prior to the implementation of MRP II in its Greene plant (from 1988 through 1990) good intentions and hard work were proving to be less than necessary to compete in the global market. Certified class "A" in February 1990. The Raymond Corporation has built a world-class organization from these foundations.

  15. 324 Building REC and HLV Tank Closure Plan

    International Nuclear Information System (INIS)

    Becker-Khaleel, B.; Schlick, K.

    1995-12-01

    This closure plan describes the activities necessary to close the 324 Radiochemical Engineering Cells (REC) and High-Level Vault (HLV) in accordance with the Washington State Dangerous Waste regulations. To provide a complete description of the activities required, the closure plan relies on information contained in the 324 Building B-Cell Safety Cleanout Project (BCCP) plans, the 324 Building REC HLV Interim Waste Management Plan (IWMP), the Project Management Plan for Nuclear Facilities Management 300 Area Compliance Program, and the 324 High Level Vault Interim Removal Action Project (project management plan [PMP]). The IWMP addresses the management of mixed waste in accordance with state and federal hazardous waste regulations. It provides a strategy for managing high-activity mixed waste in compliance with Resource Conservation and Recovery Act (RCRA) requirements or provides for an alternative management approach for the waste. The BCCP outlines the past, present, and future activities necessary for removing from B-Cell the solid waste, including mixed waste generated as a result of historical research and development (R ampersand D) activities conducted in the cell. The BCCP also includes all records and project files associated with the B-Cell cleanout. This information is referenced throughout the closure plan. The PMP sets forth the plans, organization, and systems that Pacific Northwest National Laboratory (PNNL) will use to direct and control the 324 High-Level Vault Interim Removal Action Project. This project will develop and implement a treatment strategy that will remove and stabilize the inventory of liquid waste from the 324 HLV tanks. The PMP also provides for flushing and sampling the flush solution

  16. Internal marketing within a health care organization: developing an implementation plan.

    Science.gov (United States)

    Hallums, A

    1994-05-01

    This paper discusses how the concept of internal marketing can be applied within a health care organization. In order to achieve a market orientation an organization must identify the needs and wants of its customers and how these may change in the future. In order to achieve this, internal marketing is a necessary step to the implementation of the organizations marketing strategy. An outline plan for the introduction of an internal marketing programme within an acute hospital trust is proposed. The plan identifies those individuals and departments who should be involved in the planning and implementation of the programme. The benefits of internal marketing to the Trust are also considered.

  17. Successful Issues for Implementing Enterprise Resource Planning (ERP)

    Institute of Scientific and Technical Information of China (English)

    LI Bing-guang; Michael W. Riley

    2003-01-01

    Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.

  18. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  19. Issues in radioactive mixed waste compliance with RCRA [Resource Conservation and Recovery Act]: Some examples from ongoing operations at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Eaton, D.L.; Smith, T.H.; Clements, T.L. Jr.; Hodge, V.

    1990-01-01

    Radioactive mixed waste is subject to regulation under both the Resource Conservation and Recovery Act (RCRA) and the Atomic Energy Act (AEA). The regulation of such waste is the responsibility of the Environmental Protection Agency (EPA) and either the Nuclear Regulatory Commission (NRC) or the Department of Energy (DOE), depending on whether the waste is commercially generated or defense-related. The recent application of the RCRA regulations to ongoing operations at the DOE's Idaho National Engineering Laboratory (INEL) are described in greater detail. 8 refs., 2 figs

  20. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    Science.gov (United States)

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  1. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling

  2. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  3. Facility status and progress of the INEL's WERF MLLW and LLW incinerator

    International Nuclear Information System (INIS)

    Conley, D.; Corrigan, S.

    1996-01-01

    The Idaho National Engineering Laboratory's (INEL) Waste Experimental Reduction Facility (WERF) incinerator began processing beta/gamma- emitting low-level waste (LLW) in September 1984. A Resource Conservation and Recovery Act (RCRA) trial burn for the WERF incinerator was conducted in 1986, and in 1989 WERF began processing (hazardous and low-level radioactive) waste known as mixed low-level waste (MLLW). On February 14, 1991 WERF operations were suspended to improve operating procedures and configuration management. On July 12, 1995, WERF initiated incineration of LLW; and on September 20, 1995 WERF resumed its primary mission of incinerating MLLW. MLLW incineration is proceeding under RCRA interim status. State of Idaho issuance of the Part B permit is one of the State's highest permitting priorities. The State of Idaho's Division of Environmental Quality is reviewing the permit application along with a revised trial burn plan that was also submitted with the application. The trial burn has been proposed to be performed in 1996 to demonstrate compliance with the current incinerator guidance. This paper describes the experiences and problems associated with WERF's operations, incineration of MLLW, and the RCRA Part B Permit Application. Some of the challenges that have been overcome include waste characterization, waste repackaging, repackaged waste storage, and implementation of RCRA interim status requirements. A number of challenges remain. They include revision of the RCRA Part B Permit Application and the Trial Burn Plan in response to comments from the state permit application reviewers as well as facility and equipment upgrades required to meet RCRA Permitted Status

  4. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    International Nuclear Information System (INIS)

    Tian, Zhen; Folkerts, Michael; Tan, Jun; Jia, Xun; Jiang, Steve B.; Peng, Fei

    2015-01-01

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques

  5. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Zhen, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Folkerts, Michael; Tan, Jun; Jia, Xun, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Jiang, Steve B., E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu [Department of Radiation Oncology, University of Texas Southwestern Medical Center, Dallas, Texas 75390 (United States); Peng, Fei [Computer Science Department, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213 (United States)

    2015-06-15

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques.

  6. Candidate functions for advanced technology implementation in the Columbus mission planning environment

    Science.gov (United States)

    Loomis, Audrey; Kellner, Albrecht

    1988-01-01

    The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

  7. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references

  8. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; waste characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.

  9. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  10. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  11. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  12. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling

  13. 77 FR 24399 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... approve the ozone 2002 base year emissions inventory, portion of the state implementation plan (SIP... technology (RACT), contingency measures, a 2002 base- year emissions inventory and other planning SIP...

  14. RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

    1997-04-01

    This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

  15. The emergency plan implementing procedures for HANARO facility

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jong Tai; Khang, Byung Oui; Lee, Goan Yup; Lee, Moon [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    The radiological emergency plan implementing procedures of HANARO (High-flux Advanced Neutron Application Reactor) facility is prepared based on the Korea Atomic Law, the Civil Defence Law, Disaster Protection Law and the emergency related regulatory guides such as Guidance for Evolution of Radiation Emergency Plans in Nuclear Research Facilities (KAERI/TR-956/98, Feb.1998) and the emergency plan of HANARO. These procedures is also prepared to ensure adequate response activities to the rediological events which would cause a significant risk to the KAERI staffs and the public nea to the site. Periodic trainning and exercise for the reactor operators and emergency staffs will reduce accident risks and the release of radioactivities to the environment. 61 refs., 81 tabs. (Author)

  16. 76 FR 68381 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean...

    Science.gov (United States)

    2011-11-04

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean Vehicles Program AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania. This SIP revision contains Pennsylvania's Clean Vehicle Program, which adopts California's second generation low emission vehicle program...

  17. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  18. Managing Plan Implementation in the Asante Akyem South District ...

    African Journals Online (AJOL)

    Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. ... This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in ...

  19. Forest Service Global Change Research Strategy, 2009-2019 Implementation Plan

    Science.gov (United States)

    Allen Solomon; Richard A. Birdsey; Linda A. Joyce

    2010-01-01

    In keeping with the research goals of the U.S. Global Change Research Program, the climate change strategy of the U.S. Department of Agriculture (USDA), and the climate change framework of the Forest Service, this Forest Service Global Change Research Strategy, 2009-2019 Implementation Plan (hereafter called the Research Plan), was written by Forest Service Research...

  20. Facilitating food-related planning : Applying metacognition, cue-monitoring, and implementation intentions

    NARCIS (Netherlands)

    Verhoeven, A.A.C.

    2015-01-01

    Implementation intentions are specific if-then plans that can successfully change unwanted habits by linking the critical cue triggering the unwanted behavior to a healthier alternative. For example, in order to consume fewer unhealthy snacks while watching television, a plan could be formulated

  1. Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Documentation

    International Nuclear Information System (INIS)

    PLACE, B.G.

    2000-01-01

    This document provides guidance to generator groups for preparing and maintaining documentation of Pollution Prevention/Waste Minimization (P2/WMin) Program activities. The guidance is one of a hierarchical series that includes the Hanford Site Waste Minimization and Pollution Prevention Awareness Program Plan (DOE-RL, 2000) and Prime Contractor implementation plans describing programs required by Resource Conservation and Recovery Act of 1976 (RCRA) 3002(b) and 3005(h) (RCRA and EPA, 1994) and Department of Energy Acquisition Regulations (DEAR) (48 CFR 970.5204-2 and 48 CFR 970.5204-78). Documentation guidance for the following five P2/WMin elements is discussed: Fiscal Year (FY) Goals; Budget and Staffing; Pollution Prevention (P2) Reporting; WMin Certification; and Waste Minimization (WMin) Assessments (WMAs)

  2. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  3. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  4. 78 FR 889 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Science.gov (United States)

    2013-01-07

    ... Resources Defense Council; and Physicians for Social Responsibility--Los Angeles, (``environmental and... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0721; FRL-9767-3] Finding of Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South...

  5. 75 FR 20922 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Transportation...

    Science.gov (United States)

    2010-04-22

    ... with the January 2009, ``Guidance for Developing Transportation Conformity State Implementation Plans... Promulgation of Air Quality Implementation Plans; New Mexico; Transportation Conformity Requirement for... Transportation Conformity? II. What Is the Background for This Action? III. What Did the State Submit and How Did...

  6. 77 FR 45326 - Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional...

    Science.gov (United States)

    2012-07-31

    ... available in either location (e.g., Confidential Business Information). To inspect the hard copy materials..., Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze State and Federal Implementation Plans AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule; notice of additional...

  7. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    Science.gov (United States)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and

  8. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  9. 76 FR 49313 - Approval and Promulgation of Implementation Plans North Carolina: Prevention of Significant...

    Science.gov (United States)

    2011-08-10

    ... Code (NCAC), Subchapter 2D .0530, subsections (a), (b), (g), (i), (u), and (v) (from North Carolina's... and Promulgation of Implementation Plans North Carolina: Prevention of Significant Deterioration and...: EPA is taking final action to approve revisions to the North Carolina State Implementation Plan (SIP...

  10. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  11. Information needs critical to implementing the Federal Facility Compliance Act

    Energy Technology Data Exchange (ETDEWEB)

    Rasch, D.N. [Department of Energy-Idaho Operations Office, Idaho Falls, ID (United States); Kristofferson, K. [WINCO/INEL, Idaho Falls, ID (United States); Eaton, D.L. [EG& G Idaho/INEL, Idaho Falls, ID (United States)] [and others

    1994-12-31

    The presented paper summarizes the current status of data collection completed to support the Federal Facility Compliance Act (FFCA) Interim Mixed Waste Inventory Report (IMWIR), current needs, and related lessons learned. The Department of Energy (DOE), as required in Section 3021 of Resource Conservation and Recovery Act (RCRA), is required to prepare waste inventory reports, treatment reports and treatment plans. With this extensive effort, formulation of these requirements has required extensive data collection, validation and revision efforts. The framework for supporting these data needs has been enhanced by establishing a core database capable of supporting the required IMWIR, and has provided the basis for development of the Conceptual Site Treatment Plan (CSTP). The development of the CSTP has shown a need for complex wide standardized information that will ultimately become the basis for major land disposal restriction (LDR) activities such as; site treatment, equity resolution, consent agreement and continued capability to respond to stakeholder requests. DOE is in a position to dramatically demonstrate to the public and the states that mixed waste treatment can be cost effectively realized. To accomplish this program successfully will require use of existing data and expertise. This effort will be enhanced by implementation of basic system management processes which focus on completion of a mutually agreed to goal.

  12. A novel implementation of mARC treatment for non-dedicated planning systems using converted IMRT plans

    International Nuclear Information System (INIS)

    Dzierma, Yvonne; Nuesken, Frank; Licht, Norbert; Ruebe, Christian

    2013-01-01

    The modulated arc (mARC) technique has recently been introduced by Siemens as an analogue to VMAT treatment. However, up to now only one certified treatment planning system supports mARC planning. We therefore present a conversion algorithm capable of converting IMRT plans created by any treatment planning system into mARC plans, with the hope of expanding the availability of mARC to a larger range of clinical users and researchers. As additional advantages, our implementation offers improved functionality for planning hybrid arcs and provides an equivalent step-and-shoot plan for each mARC plan, which can be used as a back-up concept in institutions where only one linac is equipped with mARC. We present a feasibility study to outline a practical implementation of mARC plan conversion using Philips Pinnacle and Prowess Panther. We present examples for three different kinds of prostate and head-and-neck plans, for 6 MV and flattening-filter-free (FFF) 7 MV photon energies, which are dosimetrically verified. It is generally more difficult to create good quality IMRT plans in Pinnacle using a large number of beams and few segments. We present different ways of optimization as examples. By careful choosing the beam and segment arrangement and inversion objectives, we achieve plan qualities similar to our usual IMRT plans. The conversion of the plans to mARC format yields functional plans, which can be irradiated without incidences. Absolute dosimetric verification of both the step-and-shoot and mARC plans by point dose measurements showed deviations below 5% local dose, mARC plans deviated from step-and-shoot plans by no more than 1%. The agreement between GafChromic film measurements of planar dose before and after mARC conversion is excellent. The comparison of the 3D dose distribution measured by PTW Octavius 729 2D-Array with the step-and-shoot plans and with the TPS is well above the pass criteria of 90% of the points falling within 5% local dose and 3 mm distance

  13. Design and Implementation of Regional and Communal Energy Plans

    International Nuclear Information System (INIS)

    Jilek, W.

    1997-01-01

    Local energy planning has become a common thing, particularly after the first oil shock in the year 1973. This kind of planning claims to follow an integrated approach, i.e. to treat not only the economic problems connected with the supply of energy, but also the environmental problems concerned and the questions related to the conservation of resources. In Styria, such ''integrated'' plans have emerged in more than 25 municipalities, so far. Most of these concepts - harmonized with the clearly defined goals and objectives of the province's energy and environmental policy - may be termed a success insofar, as the measures considered therein are already in the process of practical implementation. (author)

  14. Annual report of 1995 groundwater monitoring data for the Kerr Hollow Quarry and Chestnut Ridge Sediment Disposal Basin, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-02-01

    The Kerr Hollow Quarry (KHQ) and the Chestnut Ridge Sediment Disposal Basin (CRSDB) are inactive waste management sites located at the Oak Ridge Y-12 Plant. The KHQ and CRSDB are regulated as treatment, storage, or disposal (TSD) facilities under the Resource Conservation and Recovery Act (RCRA). The facilities were granted interim status in calendar year (CY) 1986 under Tennessee Department of Environment and Conservation (TDEC) Hazardous Waste Management Rule 1200-1-11-.05. Historical environmental monitoring data and baseline characterization under interim status indicated that releases of contaminants to groundwater had not occurred; thus, the detection monitoring was implemented at the sites until either clean closure was completed or post-closure permits were issued. The CRSDB was closed in Cy 1989 under a TDEC-approved RCRA closure plan. A revised RCRA PCPA for the CRSDB was submitted by DOE personnel to TDEC staff in September 1994. A final post-closure permit was issued by the TDEC on September 18, 1995. Closure activities at KHQ under RCRA were completed in October 1993. The Record of Decision will also incorporate requirements of the RCRA post-closure permit once it is issued by the TDEC

  15. Implementation of an evolutionary algorithm in planning investment in a power distribution system

    Directory of Open Access Journals (Sweden)

    Carlos Andrés García Montoya

    2011-06-01

    Full Text Available The definition of an investment plan to implement in a distribution power system, is a task that constantly faced by utilities. This work presents a methodology for determining the investment plan for a distribution power system under a shortterm, using as a criterion for evaluating investment projects, associated costs and customers benefit from its implementation. Given the number of projects carried out annually on the system, the definition of an investment plan requires the use of computational tools to evaluate, a set of possibilities, the one that best suits the needs of the present system and better results. That is why in the job, implementing a multi objective evolutionary algorithm SPEA (Strength Pareto Evolutionary Algorithm, which, based on the principles of Pareto optimality, it deliver to the planning expert, the best solutions found in the optimization process. The performance of the algorithm is tested using a set of projects to determine the best among the possible plans. We analyze also the effect of operators on the performance of evolutionary algorithm and results.

  16. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may... employee stock benefit plan (collectively, ESOP), and a management recognition plan (MRP), provided you...

  17. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  18. American Historical Association Faculty Development Program: Planning and Implementation.

    Science.gov (United States)

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  19. Implementation Issues for Departure Planning Systems

    Science.gov (United States)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  20. Implementation Plan for a Common Nordic Retail Market. Evaluation of the responses on the public consultation

    Energy Technology Data Exchange (ETDEWEB)

    2010-09-15

    Draft implementation plan for a common Nordic Retail Market was developed in close cooperation with relevant stakeholders in the Nordic electricity market during winter and spring 2010. The implementation plan outlines what should be done, by whom and when in order to create a common Nordic end user market over the coming years. NordREG organised a public consultation on the draft implementation plan from the end of June until the beginning of the August, 2010 and received 25 responses from stakeholders. This evaluation report includes summary of stakeholders' responses and NordREG comments on stakeholders' views. The evaluation of the responses has been taken into account during the finalization of the implementation plan

  1. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  2. Kaizen planning, implementing and controlling

    CERN Document Server

    García-Alcaraz, Jorge Luis; Maldonado-Macías, Aidé Aracely

    2017-01-01

    This book reports a literature review on kaizen, its industrial applications, critical success factors, benefits gained, journals that publish about it, main authors (research groups) and universities. Kaizen is treated in this book in three stages: planning, implementation and control. The authors provide a questionnaire designed with activities in every stage, highlighting the benefits gained in each stage. The study has been applied to more than 400 managers and leaders in continuous improvement in Mexican maquiladoras. A univariate analysis is provided to the activities in every stage. Moreover, structural equation models associating those activities with the benefits gained are presented for a statistical validation. Such a relationship between activities and benefits helps managers to identify the most important factor affecting their benefits and financial income.

  3. Strategic Planning: Contextual Factors that Facilitated and/or Challenged the Implementation of Strategic Planning in Two Nonprofit Organizations

    Science.gov (United States)

    Masilamony, Davadhasan

    2010-01-01

    As the nonprofit sector continues to grow in size and importance in American society, successful organizations proactively initiate strategic planning so they can be more responsive to changing circumstances, underlying trends, and shifting demands. At times, however, organizations develop elaborate plans that are never implemented. Unfortunately,…

  4. 241-CX-70, 241-CX-71, and 241-CX-72 underground storage tanks at the strontium semiworks facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the underground storage tanks at the Strontium Semiworks Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. Radioactive material is contained in three underground storage tanks: 241-CX-70, 241-CX-71, and 241-CX-72. Tank 241-CX-70 has been emptied, except for residual quantities of waste, and has been classified as an elementary neutralization tank under the RCRA. Tanks 241-CX-71 and 241-CX-72 contain radioactive and Washington State-only dangerous waste material, but do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the Strontium Semiworks Facility

  5. Off-site shipment request development and review plan

    International Nuclear Information System (INIS)

    1992-05-01

    On May 17, 1991, Department of Energy Headquarters (DOE-HQ) imposed a moratorium on the shipment of all Resource Conservation and Recovery Act (RCRA) hazardous and Toxic Substances Control Act (TSCA) waste to commercial treatment, storage and disposal facilities. The moratorium was imposed after it was discovered that some shipments of RCRA and TSCA waste from Department of Energy (DOE) sites contained small quantities of radioactive and special nuclear material (SNM). The shipment of these wastes has been attributed to inconsistent and possibly erroneous interpretation of DOE Orders and guidance. In an effort to clarify existing DOE Orders and guidance and establish throughout the DOE complex, June 21, 1991, DOE-HQ issued in draft the Performance Objective for Certification of Non-Radioactive Hazardous Waste. This Performance Objective was subsequently approved on November 15, 1991. The Performance Objective contains specific requirements that must be net to allow the shipment of RCRA and TSCA waste for commercial treatment, storage and disposal. On July 16, 1991, based on the initial draft of the Performance Objective, Martin Marietta Energy Systems (MMES) issued a directive which applies the Performance Objective requirements to all wastes and materials. In addition, this MMES directive imposed the requirement for a review by a Central Waste Management (CWM) Readiness Review Board (RRB). Additional DOE and MMES guidance and directives have been issued since May 17, 1991. This plan applies to all waste destined for shipment from the Portsmouth Gaseous Diffusion Plant (PORTS) to off-site commercial treatment, storage and disposal facilities, and to all materials destined for recycle, surplus and salvage

  6. School Counselor Lead Initial Individual Career and Academic Plan Implementation Design

    Science.gov (United States)

    Moeder-Chandler, Markus

    2017-01-01

    In Fall of 2014 for Fountain-Fort Carson School District #8 undertook a revamping of graduation and state-mandated ICAP requirements for implementation for the graduating class of 2021. This design and implementation process included numerous stakeholders and several years of planning from Fall of 2014 to Spring of 2017. The design and…

  7. The Pinellas Plant RCRA facility investigation - A case study

    International Nuclear Information System (INIS)

    Kilbury, Richard; Keshian, Berg; Farley, Dwain; Meyer, David; Ingle, David; Biedermann, Charles

    1992-01-01

    Under the direction of the U.S. Department of Energy Albuquerque Field Office Environmental Restoration Program, a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) was completed at the Pinellas Plant to fulfill requirements of the Hazardous and Solid Waste Amendments of 1984 (HSWA) permit issued on February 9, 1990 by the U.S. Environmental Protection Agency (EPA). This RFI addressed potential contaminant releases and environmental conditions at 15 solid waste management units (SWMUs). The RFI characterization program began in April 1990 and was completed in May 1991. The scope of RFI data collection activities is presented in the Pinellas Plant RFI Workplan issued in May 1990 and approved by EPA on April 16, 1991. An RFI Report was submitted to EPA on September 1, 1991. This paper presents a summary of RFI results and conclusions. Primary environmental concerns at the Pinellas Plant are emphasized. (author)

  8. Characterization of Vadose Zone Sediment: RCRA Borehole 299-E33-338 Located Near the B-BX-BY Waste Management Area

    Energy Technology Data Exchange (ETDEWEB)

    Lindenmeier, Clark W.; Serne, R. Jeffrey; Bjornstad, Bruce N.; Gee, Glendon W.; Schaef, Herbert T.; Lanigan, David C.; Lindberg, Michael J.; Clayton, Ray E.; Legore, Virginia L.; Kutnyakov, Igor V.; Baum, Steven R.; Geiszler, Keith N.; Brown, Christopher F.; Valenta, Michelle M.; Vickerman, Tanya S.; Royack, Lisa J.

    2008-09-11

    This report was revised in September 2008 to remove acid-extractable sodium data from Table 4.8. The sodium data was removed due to potential contamination introduced during the acid extraction process. The rest of the text remains unchanged from the original report issued in June 2003. The overall goals of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., are: 1) to define risks from past and future single-shell tank farm activities, 2) to identify and evaluate the efficacy of interim measures, and 3) to aid via collection of geotechnical information and data, future decisions that must be made by the U.S. Department of Energy (DOE) regarding the near-term operations, future waste retrieval, and final closure activities for the single-shell tank waste management areas. For a more complete discussion of the goals of the Tank Farm Vadose Zone Project, see the overall work plan, Phase 1 RCRA Facility Investigation/Corrective Measures Study Work Plan for the Single-Shell Tank Waste Management Areas (DOE 1999). Specific details on the rationale for activities performed at the B-BX-BY tank farm waste management area are found in CH2M HILL (2000).

  9. Recommendation 93-5 Implementation Plan

    International Nuclear Information System (INIS)

    1994-01-01

    On July 19, 1993, the Defense Nuclear Facilities Safety Board (DNFSB) provided to the Secretary of Energy its Recommendation 93-5, which commented on the Hanford Tank Waste Characterization effort. Recommendation 93-5 highlighted the need to accelerate the characterization of the Hanford Site tank wastes to expedite the resolution of identified tank safety issues, and to provide timely design data in support of activities addressing the disposal of the tank wastes. The Department of Energy (DOE) and its prime contractor, Westinghouse Hanford Company (WHC), are in full agreement with the content of Recommendation 93-5 and have prepared this Implementation Plan to document those actions that have been or will be taken to meet Recommendation 93-5. The new Characterization Strategy embodied by this Plan acknowledges that waste distribution within a tank is the critical unknown with respect to successfully characterizing the tank for any Tank Waste Remediation Systems (TWRS) programmatic need. The new strategy has been incorporated into the following seven task: (1) strengthen technical management; (2) accelerate safety related characterization; (3) improve the quality and quantity of sampling (4) streamline tank access; (5) improve the quality and quantity of analyses; (6) improve data management; and (7) change control

  10. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  11. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  12. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    Science.gov (United States)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  13. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7

  14. 75 FR 48895 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... Plan (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency submitted the SIP... request would revise SIP requirements applicable to Saint Mary's Hospital, located in Rochester, Minnesota...

  15. Key factors in the successful implementation of enterprise resource planning system

    Directory of Open Access Journals (Sweden)

    Farajollah Rahnavard

    2014-04-01

    Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.

  16. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  17. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  18. 78 FR 40966 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Science.gov (United States)

    2013-07-09

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport of Fine Particulate Matter... a State Implementation Plan (SIP) submittal from the State of New Mexico to address Clean Air Act (CAA or Act) requirements that prohibit air emissions which will contribute significantly to...

  19. Managing Water for African Cities Johannesburg City Implementation Plan Environmental Component Appraisal Report

    OpenAIRE

    Damhaug, T.

    2000-01-01

    Årsliste 2000 This is an appraisal of the environmental component of the Johannesburg City Implementation Plan under the Habitat guided programme "Managing Water for African Cities". The objective of this appraisal was to ensure the conformity of the plan with the objectives of the Regional Project and South Africa's needs and to explore the availability of domestic resources (human, institutional, and financial) required for efficient project implementation. The environmental component wi...

  20. Implementation of enterprise resource planning systems: a user perspective

    Science.gov (United States)

    Reitsma, E.; Hilletofth, P.; Mukhtar, U.

    2018-04-01

    The purpose of this study is to evaluate critical success factors (CSFs) for the implementation of an enterprise resource planning (ERP) system from a user perspective. Users play a vital role when implementing an ERP system, but their perspective has been neglected in the literature. A better understanding of their perspective promises to contribute to the design of more effective ERP systems, its implementation, and management. In order to identify the user perspective, a survey was conducted within three Pakistani companies that recently have implemented a new ERP system. The questionnaire was developed based on thirteen CSFs deduced from literature. Based on each CSF’s level of importance, they are ranked in order of importance and divided into three groups: most important, important and not important. Findings reveal that users believe that management should prioritize the following four CSFs when implementing an ERP system: education and training, strategic decision-making, communication, and business process alignment.

  1. Implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Bullock, M.G.; Rodriguez, R.R.

    1987-05-01

    This document presents the current implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory. Information contained in this report was also included in several Department of Energy (DOE) planning documents for the Defense Transuranic Waste Program. This information can be found in the following DOE documents: Comprehensive Implementation Plan for the DOE Defense Buried TRU Waste Program; Defense Waste Management Plan for Buried Transuranic-Contaminated Waste, Transuranic-Contaminated Waste, Transuranic-Contaminated Soil, and Difficult-to-Certify Transuranic Waste; and Defense Special-Case Transuranic Waste Implementation Plan. 11 refs

  2. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  3. 77 FR 64445 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0541; FRL 9733-5] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... Illinois State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located...

  4. 77 FR 64422 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located at 5... submitted an Adjusted Standard for the Greif Packaging, LLC facility located at 5 S 220 Frontenac Road in...

  5. 77 FR 24148 - Revision to the Hawaii State Implementation Plan, Minor New Source Review Program

    Science.gov (United States)

    2012-04-23

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0213; FRL-9661-6] Revision to the Hawaii State Implementation Plan, Minor New Source Review Program AGENCY: Environmental Protection Agency... final action to approve revisions to the Hawaii State Implementation Plan (SIP). These revisions would...

  6. 77 FR 24440 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0021(b); FRL-9661-9] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... 2002 base year emissions inventory portion of the state implementation plan (SIP) revision submitted by...

  7. 75 FR 81484 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-12-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9243-1] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading of Allowances...

  8. WIPP Waste Characterization: Implementing Regulatory Requirements in the Real World

    International Nuclear Information System (INIS)

    Cooper Wayman, J.D.; Goldstein, J.D.

    1999-01-01

    It is imperative to ensure compliance of the Waste Isolation Pilot Project (WIPP) with applicable statutory and regulatory requirements. In particular, compliance with the waste characterization requirements of the Resource Conservation and Recovery Act (RCRA) and its implementing regulation found at 40 CFR Parts 262,264 and 265 for hazardous and mixed wastes, as well as those of the Atomic Energy Act of 1954, as amended, the Reorganization Plan No. 3 of 1970, the Nuclear Waste Policy Act of 1982, as amended, and the WIPP Land Withdrawal Act, as amended, and their implementing regulations found at 40 CFR Parts 191 and 194 for non-mixed radioactive wastes, are often difficult to ensure at the operational level. For example, where a regulation may limit a waste to a certain concentration, this concentration may be difficult to measure. For example, does the definition of transuranic waste (TRU) as 100 nCi/grain of alpha-emitting transuranic isotopes per gram of waste mean that the radioassay of a waste must show a reading of 100 plus the sampling and measurement error for the waste to be a TRU waste? Although the use of acceptable knowledge to characterize waste is authorized by statute, regulation and DOE Orders, its implementation is similarly beset with difficulty. When is a document or documents sufficient to constitute acceptable knowledge? What standard can be used to determine if knowledge is acceptable for waste characterization purposes? The inherent conflict between waste characterization regulatory requirements and their implementation in the real world, and the resolution of this conflict, will be discussed

  9. 75 FR 69909 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-11-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9226-3] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... four revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking...

  10. RCRA facility investigation report for the 200-PO-1 operable unit. Revision 1

    International Nuclear Information System (INIS)

    1997-05-01

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) report is prepared in support of the RFI/corrective measures study process for the 200-PO-1 Groundwater Operable Unit in the 200 East Area of the Hanford Site. This report summarizes existing information on this operable unit presented in the 200 East and PUREX Aggregate Area Management Study Reports, contaminant specific studies, available modeling data, and groundwater monitoring data summary reports. Existing contaminant data are screened against current regulatory limits to determine contaminants of potential concern (COPC). Each identified COPC is evaluated using well-specific and plume trend analyses

  11. Research on Evaluation of Conservation Planning Implementation of Nanshe Historic Village in Dongguan City

    Science.gov (United States)

    Yubin, Luo

    2017-10-01

    Conservation planning plays an important role in the protection and development of historic villages. The evaluation of conservation planning is helpful to find out the problems existing in the village protection work which helps to improve the conservation planning system. The paper briefly summarizes the conservation planning background of Nanshe historic village in Dongguan city, Guangdong province, China. The conservation planning guided the protection work of Nanshe village since 2002. It evaluates four aspects of the conservation planning implementation and effect such as protection and utilization of the ancient buildings, roadway repair, landscape and basic sanitation facilities improvement by ways of field research and questionnaire survey. There are only nineteen ancient buildings repaired and the rest of them are part of repaired or not repaired. Most of the roadways are well preserved. Only four of them are partly repaired or not repaired. Most of the villagers like to chat under the ancient banyan trees. Conservation Planning pays not much attention to the needs of the residents. Although conservation planning of Nanshe village developed the near, middle and long term target it actually took 14 years to carry out the near target. It enhances the social awareness of Nanshe village and the sense of belongings of the villagers. Most of the villagers are satisfied with the implementation of the conservation planning. Meanwhile, the paper exposes the conservation planning is too idealistic. It lacks of implementation details and the three phases of the investment funds and pays not much attention to the needs of residents.

  12. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    Science.gov (United States)

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  13. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  14. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    Energy Technology Data Exchange (ETDEWEB)

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardous waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the

  15. SRS ES and H Standards Compliance Program Implementation Plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs

  16. Planning new basic guideline to the radiological risk. Content, radiological criteria and implementation

    International Nuclear Information System (INIS)

    Calvin Cuartero, M.; Vega Riber, R. de la; Martin Calvarro, J. M.

    2011-01-01

    The most important aspects of the Basic Guideline focus on their area of planning, groups of potential radiological emergencies in the type of activity associated with the levels of response planning and responsible organizations, structure and functions for each level, radiological criteria, implementation and maintenance of the effectiveness of the level of response plans abroad.

  17. Manpower development - planning and implementation

    International Nuclear Information System (INIS)

    Scholten, V.W.

    1978-01-01

    The demands of a nuclear technology programme on the manpower resources of a developing country are very onerous. Unlike other industries, as well as the planning and operating staff, nuclear technology requires an additional administrative infrastructure to regulate the various activities. To minimize the effect of manpower shortage, the planning and development of manpower resources need to be carried out on a national scale. To introduce a nuclear programme, a special preparatory phase is required. During this phase the special conditions appertaining to the country are first considered, as are the evaluation and then the promotional aspects of the programme. In a second phase, all the partners involved in the implementation are considered, with reference to their roles and interrelationships. Their various tasks and obligations are fully assessed. This is a wide-ranging study covering, in addition to the construction of a nuclear power plant, the industrial collaboration and licensing agreements, and the utility operational training schemes. Finally, the third phase considers the different and necessary educational requirements, and the existent and developed level of the manpower, with respect to the scope and content of the know-how transfer. When all the relevant aspects have been considered, the expansion of the universities and educational establishments must be carried out. This whole phase needs to be started as early as possible because it involves a period of some years. (author)

  18. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  19. WHC natural phenomena hazards mitigation implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  20. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  1. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  2. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    Science.gov (United States)

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  3. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  4. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  5. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  6. Implementing PlanCheyenne: Strategies and Opportunities for Smarter Growth in Cheyenne

    Science.gov (United States)

    This report is from a technical assistance project with Cheyenne, WY, to identify policy options that would implement PlanCheyenne and illustrate development that would help to achieve the community's goals.

  7. Implementation plan for HANDI 2000 TWRS master equipment list

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products

  8. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  9. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  10. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  11. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... Indiana State Implementation Plan (SIP) for lead (Pb) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES...

  12. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... the Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the Clean Air Act. On April 8, 2009, and...

  13. 76 FR 13511 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... approve revisions to the Virginia State Implementation Plan (SIP). The revisions recodify the open burning... approving these revisions to Virginia's open burning regulations in accordance with the requirements of the...

  14. 76 FR 55541 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia: Kentucky; Ohio...

    Science.gov (United States)

    2011-09-07

    ... Cabell and Wayne Counties in their entireties and a portion of Mason County (Graham Tax District) in West... reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan... Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S...

  15. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  16. The strategy of the shelter implementation plan (SIP) performance

    International Nuclear Information System (INIS)

    Geras'ko, V.N.; Nosovskij, A.V.

    1999-01-01

    In 1997 the 'Shelter Implementation Plan' (SIP) was developed it's purpose was to transform Unit 4 of the Chernobyl NPP into the ecologically safe system. The Plan was developed by common efforts of the Ukrainian scientists, CES representatives and experts from the United States of America. The fact that there are no nuclear and radiation safety criteria for the projects will result into the situation when different designers might use within the various project tasks various design criteria. Till now o exact date for the constructions stabilization activities has been defined, and it creates a kind of on definiteness while developing the Radioactive Waste Management strategy and Safe Confinement

  17. Characterization of Vadose Zone Sediment: Uncontaminated RCRA Borehole Core Samples and Composite Samples

    International Nuclear Information System (INIS)

    Serne, R. Jeffrey; Bjornstad, Bruce N.; Schaef, Herbert T.; Williams, Bruce A.; Lanigan, David C.; Horton, Duane G.; Clayton, Ray E.; Mitroshkov, Alexandre V.; Legore, Virginia L.; O'Hara, Matthew J.; Brown, Christopher F.; Parker, Kent E.; Kutnyakov, Igor V.; Serne, Jennifer N.; Last, George V.; Smith, Steven C.; Lindenmeier, Clark W.; Zachara, John M.; Burke, Deborah Sd.

    2001-01-01

    The overall goal of the of the Tank Farm Vadose Zone Project, led by CH2M HILL Hanford Group, Inc., is to define risks from past and future single-shell tank farm activities. To meet this goal, CH2M HILL Hanford Group, Inc. asked scientists from Pacific Northwest National Laboratory to perform detailed analyses on vadose zone sediment from within the S-SX Waste Management Area. This report is the first in a series of four reports to present the results of these analyses. Specifically, this report contains all the geologic, geochemical, and selected physical characterization data collected on vadose zone sediment recovered from RCRA borehole bore samples and composite samples. Intact cores from two RCRA boreholes (299-W22-48 and 299-W22-50) near the SX Tank Farm and four, large-quantity grab samples from outcrop sediment on and off the Hanford Site were sampled to better understand the fate of contaminants in the vadose zone beneath underground storage tanks at the Hanford Site. Borehole and outcrop samples analyzed for this report are located outside the tank farms, and therefore may be considered standard or background samples from which to compare contaminated sediments within the tank farms themselves. This report presents our interpretation of the physical, chemical, and mineralogical properties of the uncontaminated vadose zone sediments, and variations in the vertical distribution of these properties. The information presented in this report is intended to support preparation of the S-SX Field Investigation Report to be prepared by CH2M Hill Hanford Group, Inc. as well as future remediation actions at the S-SX Tank Farm

  18. Planning to break unwanted habits: habit strength moderates implementation intention effects on behaviour change.

    Science.gov (United States)

    Webb, Thomas L; Sheeran, Paschal; Luszczynska, Aleksandra

    2009-09-01

    Implementation intention formation promotes effective goal striving and goal attainment. However, little research has investigated whether implementation intentions promote behaviour change when people possess strong antagonistic habits. Experiment 1 developed relatively habitual responses that, after a task switch, had a detrimental impact on task performance. Forming an if-then plan reduced the negative impact of habit on performance. However, the effect of forming implementation intentions was smaller among participants who possessed strong habits as compared to participants who had weaker habits. Experiment 2 provided a field test of the role of habit strength in moderating the relationship between implementation intentions and behaviour in the context of smoking. Implementation intentions reduced smoking among participants with weak or moderate smoking habits, but not among participants with strong smoking habits. In summary, habit strength moderates the effectiveness of if-then plan formation in breaking unwanted habits.

  19. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  20. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

  1. Process evaluation of discharge planning implementation in healthcare using normalization process theory.

    Science.gov (United States)

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-04-27

    Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the

  2. Temporal trend analysis of RCRA groundwater monitoring data

    International Nuclear Information System (INIS)

    Need, E.A.

    1994-01-01

    Statistical analysis of RCRA groundwater monitoring data at a uranium hexafluoride processing facility showed a statistically significant increase in the concentration of gross beta activity in monitor wells downgradient of surface impounds storing calcium fluoride sludge and high pH water. Because evidence of leakage had not been detected in lysimeters installed beneath the impounds, the operator sought an evaluation of other potential causes of the result, including natural variability. This study determined that all five data sets showed either long-term excursionary (spike-like), or seasonal forms of temporal variation. Gross beta had an upward long-term trend with multiple excursions that almost appeared to be seasonal. Gross alpha had an upward long-term trend with multiple excursions that were clearly not seasonal. Specific conductance had both upward and downward long-term trends but no other variations. pH had a downward long-term trend with multiple excursions that were clearly not seasonal. Fluoride had a downward long-term trend without excursions but with clear seasonal variations. The gross beta result that appeared to be a significant change was a spike event on the upward long-term trend

  3. 77 FR 23622 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D...

    Science.gov (United States)

    2012-04-20

    ... Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D/B/A Crownline Boats... approving into the Illinois State Implementation Plan (SIP) an adjusted standard for Leisure Properties LLC..., known as the eight pound per hour (8 lb/ hr) rule, for volatile organic matter, for Leisure Properties...

  4. 77 FR 23652 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D...

    Science.gov (United States)

    2012-04-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0944; FRL-9648-7] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D/B/A Crownline Boats... proposing to approve into the Illinois State Implementation Plan (SIP) an adjusted standard for Leisure...

  5. 77 FR 42686 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year...

    Science.gov (United States)

    2012-07-20

    ... Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year Inventory AGENCY: Environmental... matter (PM 2.5 ) 2002 base year emissions inventory portion of the Maryland State Implementation Plan... National Ambient Air Quality Standard (NAAQS) SIP. EPA is proposing to approve the 2002 base year PM 2.5...

  6. 76 FR 13569 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia. The revisions recodify the open... . C. Mail: EPA-R03-OAR-2010-0902, Harold A. Frankford, Air Protection Division, Mailcode 3AP00, U.S...

  7. IMPLEMENTING FRANCHISING INTO A BUSINESS. : Based on my own business plan.

    OpenAIRE

    Krzyzaniak, Patryk

    2016-01-01

    The aim of the thesis is to successfully implement a business system based on franchising into the author's own business. The thesis will provide information about the actual busi-ness plan, theoretical and practical investigation on how franchising would efficiently work in the Finnish market, basic principles of cooperation on a franchise basis, categories of fran-chising (in general and in cooperation with the author's business plan), advantages and dis-advantages of having franchising as ...

  8. Transuranic Storage Area (TSA)-3 container storage unit RCRA closure plan

    International Nuclear Information System (INIS)

    Barry, G.A.; Lodman, D.L.; Spry, M.J.; Poor, K.J.

    1992-11-01

    This document describes the proposed plan for closure of the Transuranic Storage Area (TSA)-3 container storage unit at the Idaho National Engineering Laboratory in accordance with the Resource Conservation and Recovery Act closure requirements. The location, size, capacity, history, and current status of the unit are described. The unit will be closed by decontaminating structures and equipment that may have contacted waste. Sufficient sampling and documentation of all activities will be performed to demonstrate clean closure. A tentative schedule is provided in the form of a milestone chart

  9. RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1991-09-01

    This report provides a detailed summary of the activities carried out to sample groundwater at Waste Area Grouping (WAG) 6. The analytical results for samples collected during Phase 1, Activity 2 of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI) are also presented. In addition, analytical results for Phase 1, activity sampling events for which data were not previously reported are included in this TM. A summary of the groundwater sampling activities of WAG 6, to date, are given in the Introduction. The Methodology section describes the sampling procedures and analytical parameters. Six attachments are included. Attachments 1 and 2 provide analytical results for selected RFI groundwater samples and ORNL sampling event. Attachment 3 provides a summary of the contaminants detected in each well sampled for all sampling events conducted at WAG 6. Bechtel National Inc. (BNI)/IT Corporation Contract Laboratory (IT) RFI analytical methods and detection limits are given in Attachment 4. Attachment 5 provides the Oak Ridge National Laboratory (ORNL)/Analytical Chemistry Division (ACD) analytical methods and detection limits and Resource Conservation and Recovery Act (RCRA) quarterly compliance monitoring (1988--1989). Attachment 6 provides ORNL/ACD groundwater analytical methods and detection limits (for the 1990 RCRA semi-annual compliance monitoring)

  10. 78 FR 28550 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter Counties...

    Science.gov (United States)

    2013-05-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2013-0021;EPA-R05-OAR-2013-0022; FRL-9812-3] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter... Porter State Implementation Plans (SIPs) for the 1997 8-hour ozone standard, and the 1997 annual fine...

  11. Borehole Data Package for Calendar Year 2000-2001 RCRA Wells at Single-Shell Tank Waste Management Area T

    International Nuclear Information System (INIS)

    Horton, Duane G; Hodges, Floyd N

    2001-01-01

    This document compiles information of the drilling and construction, well development, pump installation, and sediment and groundwater sampling applicable to the installation of five new RCRA wells in calendar year 2000 - 2001. Appendix A contains the Well Summary Sheets (as-built diagrams); the Well Construction Summary Reports, and the geologist's logs; Appendix B contains physical properties data; and Appendix C contains the borehole geophysical logs

  12. RCRA [Resource Conservation and Recovery Act] ground-water monitoring projects for Hanford facilities: Annual progress report for 1988

    International Nuclear Information System (INIS)

    Fruland, R.M.; Lundgren, R.E.

    1989-04-01

    This report describes the progress during 1988 of 14 Hanford Site ground-water monitoring projects covering 16 hazardous waste facilities and 1 nonhazardous waste facility (the Solid Waste Landfill). Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act (RCRA) of 1976 and the State of Washington Administrative Code. 21 refs., 23 figs., 8 tabs

  13. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  14. Phase II test plan for the evaluation of the performance of container filling systems

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    The PHMC will provide tank wastes for final treatment by BNFL from Hanford's waste tanks. Concerns about the ability for ''grab'' sampling to provide large volumes of representative waste samples has led to the development of a nested, fixed-depth sampling system. Preferred concepts for filling sample containers that meet RCRA organic sample criteria were identified by a PHMC Decision Board. These systems will replace the needle based sampling ''T'' that is currently on the sampling system. This test plan document identifies cold tests with simulants that will demonstrate the preferred bottle filling concepts abilities to provide representative waste samples and will meet RCRA criteria. Additional tests are identified that evaluate the potential for cross-contamination between samples and the ability for the system to decontaminate surfaces which have contacted tank wastes. These tests will be performed with kaolidwater and sand/water slurry simulants in the test rig that was used by AEAT to complete Phase 1 tests in FY 1999

  15. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  16. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  17. First annual report RCRA post-closure monitoring and inspections for the U-3fi waste unit. Final report, July 1995--October 1996

    International Nuclear Information System (INIS)

    Emer, D.F.

    1997-01-01

    This annual Neutron Soil Moisture Monitoring report provides an analysis and summary for site inspections, meteorological information, and neutron soil moisture monitoring data obtained at the U-3fi RCRA Unit, located in Area 3 of the Nevada Site (NTS), Nye County, Nevada during the July 1995 to October 1996 period. Inspections of the U-3fi RCRA Unit are conducted to determine and document the physical condition of the covers, facilities, and any unusual conditions that could impact the proper operation of the waste unit closure. The objective of the neutron logging is to monitor the soil moisture conditions along the 420 ft ER3-3 borehole and detect changes that may be indicative of moisture movement in the regulated interval. This is the first annual report on the U-3fi closure and includes the first year baseline monitoring data as well as one quarter of compliance monitoring data

  18. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    Science.gov (United States)

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  19. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  20. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident

    International Nuclear Information System (INIS)

    2014-01-01

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  1. Current Strategic Business Plan for the Implementation of Digital Systems.

    Science.gov (United States)

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  2. Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter

    Science.gov (United States)

    Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico

    2018-05-01

    The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning

  3. 40 CFR 52.142 - Federal Implementation Plan for Tri-Cities landfill, Salt River Pima-Maricopa Indian Community.

    Science.gov (United States)

    2010-07-01

    ...-Cities landfill, Salt River Pima-Maricopa Indian Community. 52.142 Section 52.142 Protection of... IMPLEMENTATION PLANS Arizona § 52.142 Federal Implementation Plan for Tri-Cities landfill, Salt River Pima... the Tri-Cities landfill located on the Salt River Pima-Maricopa Indian Community near Phoenix, Arizona...

  4. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  5. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  6. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  7. 105-DR Large Sodium Fire Facility Supplemental Information to the Hanford Facility Contingency Plan (DOE/RL-93-75)

    International Nuclear Information System (INIS)

    Edens, V.G.

    1998-05-01

    This document is a unit-specific contingency plan for the 105-DR Large Sodium Fire Facility and is intended to be used as a supplement to DOE/RL-93-75, Hanford Facility Contingency Plan (DOE-RL 1993). This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of Washington Administrative Code (WAC) 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units.The LSFF occupied the former ventilation supply fan room and was established to provide a means of investigating fire and safety aspects associated with large sodium or other metal alkali fires. The unit was used to conduct experiments for studying the behavior of molten alkali metals and alkali metal fires. This unit had also been used for the storage and treatment of alkali metal dangerous waste. Additionally, the Fusion Safety Support Studies programs sponsored intermediate-size safety reaction tests in the LSFF with lithium and lithium-lead compounds. The LSFF, which is a RCRA site, was partially clean closed in 1995 and is documented in 'Transfer of the 105-DR Large Sodium Fire Facility to Bechtel Hanford, Inc.' (BHI 1998). In summary, the 105-DR supply fan room (1720-DR) has been demolished, and a majority of the surrounding soils were clean-closed. The 117-DR Filter Building, 116-DR Exhaust Stack, 119- DR Sampling Building, and associated ducting/tunnels were not covered under this closure

  8. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  9. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  10. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  11. Remedial investigation work plan for Bear Creek (Y02-S600) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Turner, R.R.; Bogle, M.A.; Clapp, R.B.; Dearstone, K.; Dreier, R.B.; Early, T.O.; Herbes, S.E.; Loar, J.M.; Parr, P.D.; Southworth, G.R.

    1991-07-01

    As part of its response to Resource Conservation and Recovery Act (RCRA), the US Department of Energy had agreed to further investigate contamination of Bear Creek and its floodplain resulting from releases of hazardous waste or hazardous constituents from the Y-12 Plant solid waste management units (SWMU) located in the Bear Creek watershed. That proposed RCRA Facility Investigation has been modified to incorporate the requirements of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) into a Remedial Investigation (RI) Plan for Bear Creek. This document is the RI Plan for Bear Creek and its flood-of-record floodplain. The following assumptions were made in the preparation of this RI Plan: (1) That source-area groundwater monitoring will be conducted as a part of the comprehensive groundwater monitoring plan for the Bear Creek Hydrogeologic Regime; and (2) that postclosure activities associated with each SWMU do not explicitly include a comprehensive assessment of surface water, sediment, and floodplain soil contamination in Bear Creek and its tributaries. The RI Plan is thus intended to provide a more comprehensive evaluation of Bear Creek and its floodplain than that provided by the investigative monitoring and risk assessment activities associated with the ten individual SWMUs. RI activities will be carefully coordinated with other monitoring and assessment activities to avoid redundancy and to maximize the utility of data gathered during the investigation. 121 refs., 61 figs., 46 tabs

  12. MEDBASE: Strategic Planning and Implementation of an Army Medical Department Software Application

    Science.gov (United States)

    2003-07-17

    downtime procedures) Software/ hardware performance testing Contingency plans Celebration / people management Risk Zone 4 Planning for upgrades...goal to “Crush Adidas !” and Honda’s goal in 1970 to “destroy Yamaha!”. MEDBASE: Strategy and Implementation 57 (3) Role Model BHAGs suit up-and...Crush Adidas ! (Nike, 1960s) Yamaha so tsubusu! We will destroy Yamaha! (Honda, 1970s) Role-Model BHAGs suit up-and-coming organizations Become the

  13. Implementing Trauma-Informed Partner Violence Assessment in Family Planning Clinics.

    Science.gov (United States)

    Decker, Michele R; Flessa, Sarah; Pillai, Ruchita V; Dick, Rebecca N; Quam, Jamie; Cheng, Diana; McDonald-Mosley, Raegan; Alexander, Kamila A; Holliday, Charvonne N; Miller, Elizabeth

    2017-09-01

    Intimate partner violence (IPV) and reproductive coercion (RC) are associated with poor reproductive health. Little is known about how family planning clinics implement brief IPV/RC assessment interventions in practice. We describe the uptake and impact of a brief, trauma-informed, universal IPV/RC assessment and education intervention. Intervention implementation was evaluated via a mixed methods study among women ages 18 and up receiving care at one of two family planning clinics in greater Baltimore, MD. This mixed methods study entailed a quasi-experimental, single group pretest-posttest study with family planning clinic patients (baseline and exit survey n = 132; 3-month retention n = 68; retention rate = 52%), coupled with qualitative interviews with providers and patients (total n = 35). Two thirds (65%) of women reported receiving at least one element of the intervention on their exit survey immediately following the clinic-visit. Patients reported that clinic-based IPV assessment is helpful, irrespective of IPV history. Relative to those who reported neither, participants who received either intervention element reported greater perceived caring from providers, confidence in provider response to abusive relationships, and knowledge of IPV-related resources at follow-up. Providers and patients alike described the educational card as a valuable tool. Participants described trade-offs of paper versus in-person, electronic medical record-facilitated screening, and patient reluctance to disclose current situations of abuse. In real-world family planning clinic settings, a brief assessment and support intervention was successful in communicating provider caring and increasing knowledge of violence-related resources, endpoints previously deemed valuable by IPV survivors. Results emphasize the merit of universal education in IPV/RC clinical interventions over seeking IPV disclosure.

  14. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  15. Implementation Plan for Chemical Industry R&D Roadmap for Nanomaterials by Design

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2006-04-01

    The purpose of this effort is to develop an implementation plan to realize the vision and goals identified in the Chemical Industry R&D Roadmap for Nanomaterials By Design: From Fundamentals to Function.

  16. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  17. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC.

  18. Action Plan and Timetable for the Implementation of the ERC's Recommendations

    CERN Document Server

    2002-01-01

    Following the External Review Committee's (ERC) Report (CERN/2444) and Council's statement after the discussions in the June 2002 Committees, the Management presents in this document an Action Plan and a time table, aiming at coherent detailing and implementation of the recommendations of the ERC

  19. Maintenance Implementation Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Stark, T.E.

    1992-10-01

    This Maintenance Implementation Plan (MIP) has been developed for the 222-S Laboratory at Hanford. It is based on assessments of the existing maintenance program to the requirements specified by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program (DOE 1990), Chapter II, Change 3. The results of these assessments were evaluated to determine corrective actions required. The 222-S Laboratory is currently supporting the waste management, chemical processing, and environmental monitoring programs presently under Westinghouse Hanford Company (Westinghouse Hanford) responsibility. This is done through quality analytical and process chemistry services

  20. Feasibility study of X-ray K-edge analysis of RCRA heavy metal contamination of sludge packaged in drums

    International Nuclear Information System (INIS)

    Jensen, T.

    1999-01-01

    A study has been completed to assess the capabilities of X-ray K-edge analysis in the measurement of RCRA metal contamination of sludge packaged in drums. Results were obtained for mercury and lead contamination. It was not possible to measure cadmium contamination using this technique. No false positive signals were observed. In cases where uniformity of the sludge can be assumed, this analysis can provide a quick, accurate measurement of heavy-metal contamination

  1. The Challenges of Implementing Sustainable Development: The Case of Sofia’s Master Plan

    Directory of Open Access Journals (Sweden)

    Aleksandar D. Slaev

    2016-12-01

    Full Text Available In this paper, we explore how master planning promotes and implements particular urban development patterns and, more generally, contributes to sustainability. Our goal is to understand the link between urban growth intentions articulated through the master planning process and realisation of its specific forms, e.g., monocentric or polycentric, compact or dispersed. As a case study, we examine the current General Urban Development Plan (GUDP of the Bulgarian capital Sofia against the city’s actual development pattern. We observe that the primary goals of the GUDP are to promote a polycentric urban structure and low-density expansion, as well as preserve green edges. While the question of whether and how these goals reflect the sustainability ideal requires further consideration, there are some indications that Sofia’s GUDP may not be effective in encouraging sustainable forms of growth. Substantial inconsistencies exist between the plan’s overall goals and some of its measures and implementation tools. The results on the ground suggest that, despite the plan’s low-density aspirations, Sofia is becoming more compact and densified, while losing its green edges and failing to redirect growth to its northern territories where ample space and opportunities exist. We conclude that employing the achievements of research on sustainability and developing relevant implementation tools such as more effective zoning regulations and viable suburban transportation infrastructure are necessary for realising both the patterns proposed through master planning and achieving sustainable urban growth.

  2. 77 FR 74820 - Approval and Promulgation of Implementation Plans; Tennessee: Knox County Supplemental Motor...

    Science.gov (United States)

    2012-12-18

    ... Regional Office's normal hours of operation. The Regional Office's official hours of business are Monday... maintenance plan to increase the safety margin as a result of new emissions model, VMT projection models, and... Promulgation of Implementation Plans; Tennessee: Knox County Supplemental Motor Vehicle Emissions Budget Update...

  3. Hanford land disposal restrictions plan for mixed wastes

    International Nuclear Information System (INIS)

    1990-10-01

    Since the early 1940s, the Hanford Site has been involved in the production and purification of nuclear defense materials. These production activities have resulted in the generation of large quantities of liquid and solid radioactive mixed waste. This waste is subject to regulation under authority of both the Resource Conservation and Recovery Act of 1976 (RCRA) and the Atomic Energy Act. The State of Washington Department of Ecology (Ecology), the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) have entered into an agreement, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) to bring Hanford Site Operations into compliance with dangerous waste regulations. The Tri-Party Agreement was amended to require development of the Hanford Land Disposal Restrictions Plan for Mixed Wastes (this plan) to comply with land disposal restrictions requirements for radioactive mixed waste. The Tri-Party Agreement requires, and the this plan provides, the following sections: Waste Characterization Plan, Storage Report, Treatment Report, Treatment Plan, Waste Minimization Plan, a schedule, depicting the events necessary to achieve full compliance with land disposal restriction requirements, and a process for establishing interim milestones. 34 refs., 28 figs., 35 tabs

  4. Hanford land disposal restrictions plan for mixed wastes

    Energy Technology Data Exchange (ETDEWEB)

    1990-10-01

    Since the early 1940s, the Hanford Site has been involved in the production and purification of nuclear defense materials. These production activities have resulted in the generation of large quantities of liquid and solid radioactive mixed waste. This waste is subject to regulation under authority of both the Resource Conservation and Recovery Act of 1976 (RCRA) and the Atomic Energy Act. The State of Washington Department of Ecology (Ecology), the US Environmental Protection Agency (EPA), and the US Department of Energy (DOE) have entered into an agreement, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) to bring Hanford Site Operations into compliance with dangerous waste regulations. The Tri-Party Agreement was amended to require development of the Hanford Land Disposal Restrictions Plan for Mixed Wastes (this plan) to comply with land disposal restrictions requirements for radioactive mixed waste. The Tri-Party Agreement requires, and the this plan provides, the following sections: Waste Characterization Plan, Storage Report, Treatment Report, Treatment Plan, Waste Minimization Plan, a schedule, depicting the events necessary to achieve full compliance with land disposal restriction requirements, and a process for establishing interim milestones. 34 refs., 28 figs., 35 tabs.

  5. Barriers and facilitators to implementing cancer survivorship care plans.

    Science.gov (United States)

    Dulko, Dorothy; Pace, Claire M; Dittus, Kim L; Sprague, Brian L; Pollack, Lori A; Hawkins, Nikki A; Geller, Berta M

    2013-11-01

    To evaluate the process of survivorship care plan (SCP) completion and to survey oncology staff and primary care physicians (PCPs) regarding challenges of implementing SCPs. Descriptive pilot study. Two facilities in Vermont, an urban academic medical center and a rural community academic cancer center. 17 oncology clinical staff created SCPs, 39 PCPs completed surveys, and 58 patients (breast or colorectal cancer) participated in a telephone survey. Using Journey Forward tools, SCPs were created and presented to patients. PCPs received the SCP with a survey assessing its usefulness and barriers to delivery. Oncology staff were interviewed to assess perceived challenges and benefits of SCPs. Qualitative and quantitative data were used to identify challenges to the development and implementation process as well as patient perceptions of the SCP visit. SCP, healthcare provider perception of barriers to completion and implementation, and patient perception of SCP visit. Oncology staff cited the time required to obtain information for SCPs as a challenge. Completing SCPs 3-6 months after treatment ended was optimal. All participants felt advanced practice professionals should complete and review SCPs with patients. The most common challenge for PCPs to implement SCP recommendations was insufficient knowledge of cancer survivor issues. Most patients found the care plan visit very useful, particularly within six months of diagnosis. Creation time may be a barrier to widespread SCP implementation. Cancer survivors find SCPs useful, but PCPs feel insufficient knowledge of cancer survivor issues is a barrier to providing best follow-up care. Incorporating SCPs in electronic medical records may facilitate patient identification, appropriate staff scheduling, and timely SCP creation. Oncology nurse practitioners are well positioned to create and deliver SCPs, transitioning patients from oncology care to a PCP in a shared-care model of optimal wellness. Institution support for

  6. Prospects and Challenges of Implementing the Hydrographic Region VIII Basin Plan

    Directory of Open Access Journals (Sweden)

    Nathalia Silva Duarte

    2011-12-01

    Full Text Available The current “National Water Law” states that water resources plans must be elaborated by basins, states, and for the country. This essay discusses the water management process considering federal and state legislations and their interrelations, for the purpose of elucidating the gaps found in them , aiming at their applicability to the system of water resources management within the CBH- Macaé and Ostras scope. It also discusses the construction and evolution process of the above-mentioned committee, and developments in the implementation of the Basin Plan of Hydrographic Region VIII.

  7. Reciprocal Peer Coaching: A Critical Contributor to Implementing Individual Leadership Plans

    Science.gov (United States)

    Goldman, Ellen; Wesner, Marilyn; Karnchanomai, Ornpawee

    2013-01-01

    Billions of dollars are spent annually on programs to develop organizational leaders, yet the effectiveness of these programs is poorly understood. Scholars advise that value is enhanced by the development of individual leadership plans at program completion, followed by implementation experience with subsequent coaching and reflection. The…

  8. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    Energy Technology Data Exchange (ETDEWEB)

    Moe, Wayne [Idaho National Lab. (INL), Idaho Falls, ID (United States); Honma, George [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

  9. Idaho National Laboratory Site Pollution Prevention Plan

    International Nuclear Information System (INIS)

    E. D. Sellers

    2007-01-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  10. Idaho National Laboratory Site Pollution Prevention Plan

    Energy Technology Data Exchange (ETDEWEB)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Management System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively

  11. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    Energy Technology Data Exchange (ETDEWEB)

    Vigil-Holterman, Luciana R. [Los Alamos National Laboratory

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of the open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.

  12. Construction of mixed waste storage RCRA facilities, Buildings 7668 and 7669: Environmental assessment

    International Nuclear Information System (INIS)

    1994-04-01

    The Department of Energy has prepared an environmental assessment, DOE/EA-0820, to assess the potential environmental impacts of constructing and operating two mixed waste Resource Conservation and Recovery Act (RCRA) storage facilities. The new facilities would be located inside and immediately west of the security-fenced area of the Oak Ridge National Laboratory Hazardous Waste Management Area in Melton Valley, Tennessee. Based on the analyses in the environmental assessment, the Department has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969. Therefore, the preparation of an environmental impact statement is not required, and the Department is issuing this finding of no significant impact

  13. CSSP implementation plan for space plasma physics programs

    International Nuclear Information System (INIS)

    Baker, D.N.; Williams, D.J.; Johns Hopkins Univ., Laurel, MD)

    1985-01-01

    The Committee on Solar and Space Physics (CSSP) has provided NASA with guidance in the areas of solar, heliospheric, magnetospheric, and upper atmospheric research. The budgetary sitation confronted by NASA has called for a prioritized plane for the implementation of solar and space plasma physics programs. CSSP has developed the following recommendations: (1) continue implementation of both the Upper Atmosphere Research Satellite and Solar Optical Telescope programs; (2) initiate the International Solar Terrestrial Physics program; (3) plan for later major free-flying missions and carry out the technology development they require; (4) launch an average of one solar and space physics Explorer per yr beginning in 1990; (5) enhance current Shuttle/Spacelab programs; (6) develop facility-class instrumentation; (7) augment the solar terrestrial theory program by FY 1990; (8) support a compute modeling program; (9) strengthen the research and analysis program; and (10) maintain a stable suborbital program for flexible science objectives in upper atmosphere and space plasma physics

  14. 77 FR 21911 - Approval and Promulgation of Implementation Plans; State of Arizona; Prevention of Air Pollution...

    Science.gov (United States)

    2012-04-12

    ...EPA is proposing to approve the State Implementation Plan (SIP) revision submitted by the State of Arizona to address the requirements regarding air pollution emergency episodes in Clean Air Act (CAA or Act) section 110(a)(2)(G). Section 110(a)(2)(G) of the Act requires that each SIP provide for authority comparable to that in section 303 of the Act and adequate contingency plans to implement such authority. EPA is proposing to approve Arizona's SIP revision as meeting the authority and contingency plans for the 1997 8-hour ozone National Ambient Air Quality Standards (NAAQS or standards).

  15. PC-based Multiple Information System Interface (PC/MISI) detailed design and implementation plan

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Hall, Philip P.

    1985-01-01

    The design plan for the personal computer multiple information system interface (PC/MISI) project is discussed. The document is intended to be used as a blueprint for the implementation of the system. Each component is described in the detail necessary to allow programmers to implement the system. A description of the system data flow and system file structures is given.

  16. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  17. 78 FR 37741 - Approval and Promulgation of Implementation Plans; California; South Coast; Contingency Measures...

    Science.gov (United States)

    2013-06-24

    ... deliver: Marty Robin, Office of Air Planning (AIR- 2), U.S. Environmental Protection Agency Region 9, 75... INFORMATION CONTACT: Doris Lo, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region 9... statute precludes a State from implementing such measures before they are triggered. See, e.g., LEAN v...

  18. Stakeholders' Perception on National Heatwave Plans and Their Local Implementation in Belgium and The Netherlands.

    Science.gov (United States)

    van Loenhout, Joris Adriaan Frank; Rodriguez-Llanes, Jose Manuel; Guha-Sapir, Debarati

    2016-11-10

    National heatwave plans are aimed at reducing the avoidable human health consequences due to heatwaves, by providing warnings as well as improving communication between relevant stakeholders. The objective of this study was to assess the perceptions of key stakeholders within plans in Belgium and The Netherlands on their responsibilities, the partnerships, and the effectiveness of the local implementation in Brussels and Amsterdam. Key informant interviews were held with stakeholders that had an important role in development of the heatwave plan in these countries, or its implementation in Brussels or Amsterdam. Care organisations, including hospitals and elderly care organisations, had a lack of familiarity with the national heatwave plan in both cities, and prioritised heat the lowest. Some groups of individuals, specifically socially isolated individuals, are not sufficiently addressed by the current national heatwave plans and most local plans. Stakeholders reported that responsibilities were not clearly described and that the national plan does not describe tasks on a local level. We recommend to urgently increase awareness on the impact of heat on health among care organisations. More emphasis needs to be given to the variety of heat-risk groups. Stakeholders should be involved in the development of updates of the plans.

  19. Clinical implementation of AXB from AAA for breast: Plan quality and subvolume analysis.

    Science.gov (United States)

    Guebert, Alexandra; Conroy, Leigh; Weppler, Sarah; Alghamdi, Majed; Conway, Jessica; Harper, Lindsay; Phan, Tien; Olivotto, Ivo A; Smith, Wendy L; Quirk, Sarah

    2018-04-25

    Two dose calculation algorithms are available in Varian Eclipse software: Anisotropic Analytical Algorithm (AAA) and Acuros External Beam (AXB). Many Varian Eclipse-based centers have access to AXB; however, a thorough understanding of how it will affect plan characteristics and, subsequently, clinical practice is necessary prior to implementation. We characterized the difference in breast plan quality between AXB and AAA for dissemination to clinicians during implementation. Locoregional irradiation plans were created with AAA for 30 breast cancer patients with a prescription dose of 50 Gy to the breast and 45 Gy to the regional node, in 25 fractions. The internal mammary chain (IMC CTV ) nodes were covered by 80% of the breast dose. AXB, both dose-to-water and dose-to-medium reporting, was used to recalculate plans while maintaining constant monitor units. Target coverage and organ-at-risk doses were compared between the two algorithms using dose-volume parameters. An analysis to assess location-specific changes was performed by dividing the breast into nine subvolumes in the superior-inferior and left-right directions. There were minimal differences found between the AXB and AAA calculated plans. The median difference between AXB and AAA for breast CTV V 95% , was AAA for breast radiotherapy is not expected to result in changes in clinical practice for prescribing or planning breast radiotherapy. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.

  20. Atmospheric Release Advisory Capability (ARAC): development and plans for implementation

    International Nuclear Information System (INIS)

    Dickerson, M.H.; Orphan, R.C.

    1975-01-01

    The Atmospheric Release Advisory Capability (ARAC) is an ERDA-sponsored service planned for nuclear facilities which require a means of real-time prediction of the extent of health hazards that may result from a release of radionuclides or other toxic materials. Since 1973 when the ARAC concept was initiated, a joint feasibility study has been conducted by Lawrence Livermore Laboratory and Savannah River Laboratory, and a prototype component of the system has been built and placed in operation. During the next three years plans are to implement the ARAC service for certain ERDA nuclear facilities. A brief description is presented of the ARAC concept, and progress to date is reported. (U.S.)

  1. Systems engineering management and implementation plan for Project W-464, immobilized high-level waste storage

    International Nuclear Information System (INIS)

    Wecks, M.D.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  2. Systems engineering management and implementation plan for Project W-465, immobilized low-activity waste storage

    International Nuclear Information System (INIS)

    Kaspar, J.R.; Latray, D.A.

    1998-01-01

    The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented

  3. 77 FR 27671 - State of Hawaii; Regional Haze Federal Implementation Plan

    Science.gov (United States)

    2012-05-11

    ... High School in the Cafeteria, 155 W. Kawili St., Hilo, Hawaii 96720. To provide opportunities for... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0345; FRL-9671-2] State of Hawaii... and June 1, 2012 for the proposed rule, ``State of Hawaii; Regional Haze Federal Implementation Plan...

  4. Developing an Implementation Plan. The Administration of Career Education: Module 8.

    Science.gov (United States)

    Drier, Harry N., Jr., Ed.; Martinez, Nancy S., Ed.

    The module is one of a series of eight developed to provide inservice education training for administrators of career education programs. An examination of basic scientific planning approaches and procedures is presented to provide the administrator with a basic tool to implement career education. Various scientific management techniques and their…

  5. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1985-01-01

    This document is the second annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first annual report as necessary (DOE/RW-0003, 1984). Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. The generic approach that the Department plans to follow in deploying FIS facilities is also described

  6. 202-S Hexone Facility supplemental information to the Hanford Facility Contingency Plan

    International Nuclear Information System (INIS)

    Ingle, S.J.

    1996-03-01

    This document is a unit-specific contingency plan for the 202-S Hexone Facility and is intended to be used as a supplement to the Hanford Facility Contingency Plan. This unit-specific plan is to be used to demonstrate compliance with the contingency plan requirements of WAC 173-303 for certain Resource Conservation and Recovery Act of 1976 (RCRA) waste management units. The 202-S Hexone Facility is not used to process radioactive or nonradioactive hazardous material. Radioactive, dangerous waste material is contained in two underground storage tanks, 276-S-141 and 276-S-142. These tanks do not present a significant hazard to adjacent facilities, personnel, or the environment. Currently, dangerous waste management activities are not being applied at the tanks. It is unlikely that any incidents presenting hazards to public health or the environment would occur at the 202-S Hexone Facility

  7. 76 FR 36875 - Approval and Promulgation of Implementation Plans; South Carolina: Prevention of Significant...

    Science.gov (United States)

    2011-06-23

    ... requirements pertaining to NO X as an ozone precursor into the South Carolina SIP. b. NSR PM2.5 Rule With...-0958-201119; FRL-9322- 6] Approval and Promulgation of Implementation Plans; South Carolina: Prevention.... SUMMARY: EPA is taking final action to approve three revisions to the South Carolina State Implementation...

  8. Long range planning, scheduling and budgeting for the environmental compliance program at the Rocky Flats Plant

    International Nuclear Information System (INIS)

    McKinley, K.B.; Nielsen, T.H.

    1989-01-01

    This paper reports how the Rocky Flats RCRA/CERCLA group at the Rocky Flats Plant in Golden, Colorado is developing a computerized schedule and budget management system. The system will aggregate schedule, budgets, and regulatory commitments provided by RCRA/CERCLA program managers. The system will provide tabular and graphical representations of the schedule and budget information at various levels of detail. The system will perform a variety of analyses on the schedule and budget. The RCRA/CERCLA group will use the results to develop realistic compliance schedules and the budgets necessary to meet them. Presentation of the schedules and budgets in a consistent graphical and tabular form will give a good appreciation of the remediation costs as understood by the RCRA/CERCLA group. The system will then be used to test resource availability and remediation period scenarios, differing from the optimal combination as determined by the RCRA/CERCLA group

  9. THE PREMISES OF STRATEGIC MARKETING PLANNING IMPLEMENTATION WITHIN SMALL AND MEDIUM SIZED ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Popescu Andrei

    2011-07-01

    Full Text Available The main purpose of the present paper is to identify the framework and the necessary conditions for the small and medium sized enterprises (SMEs to be able to adopt the strategic marketing planning. Also, the paper aims to underline the importance of the strategic marketing planning and the manner in which the SMEs can adopt, implement and operationalize the strategic marketing planning instruments, whose correct understanding and usage ensure the capacity to generate competitive advantage, the key element both from the perspective of the fierce competition and the perspective of the future development of the SMEs. Within SMEs the implementation of marketing becomes an evident requirment, mostly due to the relationship that these have with the market, thus, leading towards market orientation of the activities, a new approach developed by the marketing vision on managing the activities from these types of organizations. Regarded upon, from the marketing perspective, the activities from the SMEs, especially the marketing activities, cannot take place randomly. Resource allocation, a characteristic of these types of organizations, and the objectives with regards to superior customer needs satisfaction and economic efficiency maximization, claim thorough plannification and deployment of the activities in a sequence that represents the implementation of a strategy previously assumed. Within this framework, the strategic marketing planning appears as a complex process employing all scientific instruments that comprise segmentation, positioning and marketing mix. Utilizing the strategic marketing planning within SMEs depends to further extend on marketing integration; process directly related with a series of factors such as the nature of the market, development stage, product type, management quality and the influences of the marketing department of the SME. The implications onto the marketing activities from SMEs are reflected upon each strategic

  10. Hazardous-waste analysis plan for LLNL operations

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, R.S.

    1982-02-12

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste.

  11. Hazardous-waste analysis plan for LLNL operations

    International Nuclear Information System (INIS)

    Roberts, R.S.

    1982-01-01

    The Lawrence Livermore National Laboratory is involved in many facets of research ranging from nuclear weapons research to advanced Biomedical studies. Approximately 80% of all programs at LLNL generate hazardous waste in one form or another. Aside from producing waste from industrial type operations (oils, solvents, bottom sludges, etc.) many unique and toxic wastes are generated such as phosgene, dioxin (TCDD), radioactive wastes and high explosives. One key to any successful waste management program must address the following: proper identification of the waste, safe handling procedures and proper storage containers and areas. This section of the Waste Management Plan will address methodologies used for the Analysis of Hazardous Waste. In addition to the wastes defined in 40 CFR 261, LLNL and Site 300 also generate radioactive waste not specifically covered by RCRA. However, for completeness, the Waste Analysis Plan will address all hazardous waste

  12. A detection-level hazardous waste ground-water monitoring compliance plan for the 200 areas low-level burial grounds and retrievable storage units

    International Nuclear Information System (INIS)

    1987-02-01

    This plan defines the actions needed to achieve detection-level monitoring compliance at the Hanford Site 200 Areas Low-Level Burial Grounds (LLBG) in accordance with the Resource Conservation and Recovery Act (RCRA). Compliance will be achieved through characterization of the hydrogeology and monitoring of the ground water beneath the LLBG located in the Hanford Site 200 Areas. 13 refs., 20 figs

  13. Sulfur polymer cement encapsulation of RCRA toxic metals and metal oxides

    International Nuclear Information System (INIS)

    Calhoun, C.L. Jr.; Nulf, L.E.; Gorin, A.H.

    1995-06-01

    A study was conducted to determine the suitability of Sulfur Polymer Cement (SPC) encapsulation technology for the stabilization of RCRA toxic metal and metal oxide wastes. In a series of bench-scale experiments, the effects of sodium sulfide additions to the waste mixture, residence time, and temperature profile were evaluated. In addition, an effort was made to ascertain the degree to which SPC affords chemical stabilization as opposed to physical encapsulation. Experimental results have demonstrated that at the 25 wt % loading level, SPC can effectively immobilize Cr, Cr 2 O 3 , Hg, Pb, and Se to levels below regulatory limits. SPC encapsulation also has been shown to significantly reduce the leachability of other toxic compounds including PbO, PbO 2 , As 2 O 3 , BaO, and CdO. In addition, data has confirmed sulfide conversion of Hg, Pb, PbO, PbO 2 , and BaO as the product of their reaction with SPC

  14. RCRA facility investigation for the townsite of Los Alamos, New Mexico

    International Nuclear Information System (INIS)

    Dorries, A.M.; Conrad, R.C.; Nonno, L.M.

    1992-01-01

    During World War II, Los Alamos, New Mexico was established as an ideal location for the secrecy and safety needed for the research and development required to design a nuclear fission bomb. Experiments carried out in the 1940s generated both radioactive and hazardous waste constituents on what is presently part of the Los Alamos townsite. Under the RCRA permit issued to Los alamos national Laboratory in 1990, the Laboratory is scheduled for investigation of its solid waste management units (SWMUs). The existing information on levels of radioactivity on the townsite is principally data from soil samples taken during the last site decontamination in 1976, little information on the presence of hazardous constituents exists today. This paper addresses pathway analysis and a preliminary risk assessment for current residents of the Los Alamos townsite. The estimated dose levels, in mrem per year, show that the previously decontaminated SWMU areas on the Los Alamos townsite will not contribute a radiation dose of any concern to the current residents

  15. Implementation plan for smart meters in Ontario

    International Nuclear Information System (INIS)

    2004-01-01

    This paper presents Ontario Energy Board's implementation plan to install 800,000 smart meters by December 31, 2007. The objective is to help consumers control their electricity bills through conservation and demand response. The three conditions that will change power consumption habits are price changes in response to demand and supply forces; the ability of consumers to see and respond to the price signals; and, a measurement of the response so that consumers get credit for their actions. This paper identifies the mandatory technical requirements for smart meters and the support operations of distributors. It sets priorities, identifies barriers and regulatory mechanisms for cost recovery. It also discusses options for ownership of the meters. 18 refs., 1 tab., 2 figs

  16. Community Relations Plan for Lawrence Berkeley Laboratory. Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    The Lawrence Berkeley Laboratory (LBL) has applied to the California Environmental Protection Agency, Department of Toxic Substances Control (DTSC), for renewal of its Hazardous Waste Handling Facility Permit. A permit is required under Resource Conservation and Recovery Act (RCRA) regulations. The permit will allow LBL to continue using its current hazardous waste handling facility, upgrade the existing facility, and construct a replacement facility. The new facility is scheduled for completion in 1995. The existing facility will be closed under RCRA guidelines by 1996. As part of the permitting process, LBL is required to investigate areas of soil and groundwater contamination at its main site in the Berkeley Hills. The investigations are being conducted by LBL`s Environmental Restoration Program and are overseen by a number of regulatory agencies. The regulatory agencies working with LBL include the California Environmental Protection Agency`s Department of Toxic Substances Control, the California Regional Water Quality Control Board, the Bay Area Air Quality Management District, the East Bay Municipal Utilities District, and the Berkeley Department of Environmental Health. RCRA requires that the public be informed of LBL`s investigations and site cleanup, and that opportunities be available for the public to participate in making decisions about how LBL will address contamination issues. LBL has prepared this Community Relations Plan (CRP) to describe activities that LBL will use to keep the community informed of environmental restoration progress and to provide for an open dialogue with the public on issues of importance. The CRP documents the community`s current concerns about LBL`s Environmental Restoration Program. Interviews conducted between February and April 1993 with elected officials, agency staff, environmental organizations, businesses, site neighbors, and LBL employees form the basis for the information contained in this document.

  17. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1986-12-01

    This document is the third annual report on plans for providing Federal Interim Storage (FIS) capacity. References are made to the first and second annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described

  18. 78 FR 4804 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-01-23

    ... Washington State Implementation Plan; Tacoma- Pierce County Nonattainment Area AGENCY: Environmental... Tacoma-Pierce County nonattainment area for the 2006 fine particulate matter (PM 2.5 ) National Ambient... Rules.'' The updated PSCAA rules help implement the recommendations of the Tacoma-Pierce County Clean...

  19. Quality assurance of HDR prostate plans: Program implementation at a community hospital

    International Nuclear Information System (INIS)

    Rush, Jennifer B.; Thomas, Michael D.

    2005-01-01

    Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%

  20. Quality assurance of HDR prostate plans: program implementation at a community hospital.

    Science.gov (United States)

    Rush, Jennifer B; Thomas, Michael D

    2005-01-01

    Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%.

  1. Private and Public Sector Enterprise Resource Planning System Post-Implementation Practices: A Comparative Mixed Method Investigation

    Science.gov (United States)

    Bachman, Charles A.

    2010-01-01

    While private sector organizations have implemented enterprise resource planning (ERP) systems since the mid 1990s, ERP implementations within the public sector lagged by several years. This research conducted a mixed method, comparative assessment of post "go-live" ERP implementations between public and private sector organization. Based on a…

  2. Molten salt oxidation of mixed wastes: Separation of radioactive materials and Resource Conservation and Recovery Act (RCRA) materials

    International Nuclear Information System (INIS)

    Bell, J.T.; Haas, P.A.; Rudolph, J.C.

    1995-01-01

    The Oak Ridge National Laboratory (ORNL) is participating in a program to apply a molten salt oxidation (MSO) process to treatment of mixed (radioactive and RCRA) wastes. The salt residues from the MSO treatment will require further separations or other processing to prepare them for final disposal. A bench-scale MSO apparatus is being installed at ORNL and will be operated on real Oak Ridge wastes. The treatment concepts to be tested and demonstrated on the salt residues from real wastes are described

  3. 75 FR 43528 - Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan

    Science.gov (United States)

    2010-07-26

    ... National Health Security Strategy Biennial Implementation Plan AGENCY: Department of Health and Human... National Health Security Strategy (NHSS) of the United States of America (2009) and build upon the NHSS Interim Implementation Guide for the National Health Security Strategy of the United States of America...

  4. 77 FR 38191 - Approval and Promulgation of Implementation Plans; State of Mississippi; Regional Haze State...

    Science.gov (United States)

    2012-06-27

    ... SIP submittal followed the VISTAS modeling protocol and considered the contribution of total PM 10 and... revisions to the Mississippi State Implementation Plan (SIP) submitted by the State of Mississippi through.... Mississippi's SIP revisions address regional haze for the first implementation period. Specifically, these SIP...

  5. 77 FR 62200 - Approval and Promulgation of Implementation Plans; North Carolina Portion of the Charlotte...

    Science.gov (United States)

    2012-10-12

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0019(b); FRL-9741-1] Approval and Promulgation of Implementation Plans; North Carolina Portion of the Charlotte-Gastonia-Rock Hill, North Carolina-South Carolina 1997 8-Hour Ozone Nonattainment Area; Reasonable Further Progress Plan AGENCY...

  6. Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program

    International Nuclear Information System (INIS)

    Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.; Thieme, R.E.

    1988-02-01

    In 1970, the US Atomic Energy Commission established a ''transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as ''buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containing mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs

  7. HWMA/RCRA Closure Plan for the TRA Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System

    International Nuclear Information System (INIS)

    K. Winterholler

    2007-01-01

    This Hazardous Waste Management Act/Resource Conservation and Recovery Act closure plan was developed for the Test Reactor Area Fluorinel Dissolution Process Mockup and Gamma Facilities Waste System, located in Building TRA-641 at the Reactor Technology Complex (RTC), Idaho National Laboratory Site, to meet a further milestone established under the Voluntary Consent Order SITE-TANK-005 Action Plan for Tank System TRA-009. The tank system to be closed is identified as VCO-SITE-TANK-005 Tank System TRA-009. This closure plan presents the closure performance standards and methods for achieving those standards

  8. Implementation plan for deployment of Federal Interim Storage facilities for commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1989-01-01

    This document is the sixth annual report on plans for providing FIS capacity. References are made to the first, second, third, fourth, and fifth annual reports, as necessary. Background factors and aspects that were considered in the development of this deployment plan and activities and interactions considered to be required to implement an FIS program are discussed. A generic description of the approach that the Department plans to follow in deploying FIS facilities is also described. 21 refs., 1 fig., 1 tab

  9. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  10. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP's disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II

  11. 300-FF-1 remedial design report/remedial action work plan

    Energy Technology Data Exchange (ETDEWEB)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes.

  12. 300-FF-1 remedial design report/remedial action work plan

    International Nuclear Information System (INIS)

    Gustafson, F.W.

    1997-02-01

    The 300 Area has been divided into three operable units 300-FF-1, 300-FF-2, and 300-FF-5 all of which are in various stages of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process. The 300-FF-1 Operable Unit, the subject of this report, includes liquid waste disposal sites, landfills, and a burial ground. This Remedial Design Report/Remedial Action Work Plan (RDR/RAWP) provides a summary description of each waste site included in the 300-FF-1 Operable Unit, the basis for remedial actions to be taken, and the remedial action approach and management process for implementing these actions. The remedial action approach and management sections provide a description of the remedial action process description, the project schedule, the project team, required planning documentation, the remedial action change process, the process for verifying attainment of the remedial action goals, and the required CERCLA and RCRA closeout documentation. Appendix A provides additional details on each waste site. In addition to remediation of the waste sites, waste generated during the remedial investigation/feasibility study portions of the project will also be disposed at the Environmental Restoration Disposal Facility (ERDF). Appendix B provides a summary of the modeling performed in the 300-FF-1 Phase 3 FS and a description of the modeling effort to be used to show attainment of the remedial action goals. Appendix C provides the sampling and analysis plan (SAP) for all sampling and field-screening activities performed during remediation and for verification of attainment with the remedial action goals. Appendix D provides the public involvement plan, prepared to ensure information is provided to the public during remedial design and remedial action processes

  13. 75 FR 64675 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2010-10-20

    ...'s Approval of the El Paso Section 110(a)(1) Maintenance Plan for the 1997 8-Hour Ozone Standard... BPA State Implementation Plan (SIP), a 1997 8-hour ozone maintenance plan that includes a 2021 Motor... the 1997 8-hour ozone standard for the El Paso 1997 8-hour attainment area. DATES: Effective Date...

  14. Implementation plan for the Operations Center Upgrade project

    International Nuclear Information System (INIS)

    Pope, N.G.; Brown, R.E.; Turner, W.J.; Courtney, K.; Joseph, E.L.; Jones, D.; Pruett, S.

    1996-06-01

    The crossover from the existing TA-55 Facility Control System to a newly constructed system will be implemented over a four-month period beginning the first week in January, 1997. Personnel requirements and task duration have been established using planning and scheduling project management techniques. Each facility subsystem will be crossed over on individual four-day maintenance weekends during which building PF-4 will be exclusively reserved for these tasks. Each subsystem will be validated prior to the resumption of normal programmatic activities. PF-4 will be open for normal activities between each four-day maintenance weekend. Crossover will not begin until specifically outlined tasks are completed

  15. Integration of treatment innovation planning and implementation: strategic process models and organizational challenges.

    Science.gov (United States)

    Lehman, Wayne E K; Simpson, D Dwayne; Knight, Danica K; Flynn, Patrick M

    2011-06-01

    Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A two-phase procedural approach is therefore presented based on the integration of Texas Christian University (TCU) models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. (PsycINFO Database Record (c) 2011 APA, all rights reserved).

  16. Better sorry than safe : Making a Plan B reduces effectiveness of implementation intentions in healthy eating goals

    NARCIS (Netherlands)

    Vinkers, Charlotte D W; Adriaanse, Marieke A.; Kroese, Floor M.; de Ridder, Denise T D

    2015-01-01

    Objective: Implementation intentions (if–then plans) are helpful to health behaviour change. As these plans specify only one goal-directed behaviour for one specific situation, however, their effectiveness may be limited when a planned behaviour is impossible to execute in situ. The present research

  17. RCRA Assessment Plan for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    A groundwater quality assessment plan was prepared for waste management area S-SX at the Hanford Site. Groundwater monitoring is conducted at this facility in accordance with Title 40, Code of Federal Regulation (CFR) Part 265, Subpart F [and by reference of Washington Administrative Code (WAC) 173-303-400(3)]. The facility was placed in assessment groundwater monitoring program status after elevated waste constituents and indicator parameter measurements (i.e., chromium, technetium-99 and specific conductance) in downgradient monitoring wells were observed and confirmed. A first determination, as allowed under 40 CFR 265.93(d), provides the owner/operator of a facility an opportunity to demonstrate that the regulated unit is not the source of groundwater contamination. Based on results of the first determination it was concluded that multiple source locations in the waste management area could account for observed spatial and temporal groundwater contamination patterns. Consequently, a continued investigation is required. This plan, developed using the data quality objectives process, is intended to comply with the continued investigation requirement. Accordingly, the primary purpose of the present plan is to determine the rate and extent of dangerous waste (hexavalent chromium and nitrate) and radioactive constituents (e.g., technetium-99) in groundwater and to determine their concentrations in groundwater beneath waste management area S-SX. Comments and concerns expressed by the Washington State Department of Ecology on the initial waste management area S-SX assessment report were addressed in the descriptive narrative of this plan as well as in the planned activities. Comment disposition is documented in a separate addendum to this plan

  18. Planning and Implementing Immunization Billing Programs at State and Local Health Departments: Barriers and Possible Solutions.

    Science.gov (United States)

    Corriero, Rosemary; Redmon, Ginger

    Before participating in a project funded by the Centers for Disease Control and Prevention, most state and local health departments (LHDs) were not seeking reimbursement or being fully reimbursed by insurance plans for the cost of immunization services (including vaccine costs and administration fees) they provided to insured patients. Centers for Disease Control and Prevention's Billables Project was designed to enable state and LHDs to bill public and private insurance plans for immunization services provided to insured patients. Identify and describe key barriers state and LHDs may encounter while planning and implementing a billing program, as well as possible solutions for overcoming those barriers. This study used reports from Billables Project participants to explore barriers they encountered when planning and implementing a billing program and steps taken to address those barriers. Thirty-eight state immunization programs. Based on project participants' reports, barriers were noted in 7 categories: (1) funding and costs, (2) staff, (3) health department characteristics, (4) third-party payers and insurance plans, (5) software, (6) patient insurance status, and (7) other barriers. Possible solutions for overcoming those barriers included hiring or seeking external help, creating billing guides and training modules, streamlining workflows, and modifying existing software systems. Overcoming barriers during planning and implementation of a billing program can be challenging for state and LHDs, but the experiences and suggestions of past Billables Project participants can help guide future billing program efforts.

  19. Hanford Tanks Initiative quality assurance implementation plan

    International Nuclear Information System (INIS)

    Huston, J.J.

    1998-01-01

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy's Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing

  20. 75 FR 48864 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Hospital performed an air quality analysis to address the facility's impact on the SO 2 NAAQS. The facility... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency (MPCA) submitted the SIP...