WorldWideScience

Sample records for ranger operations building

  1. Development of the Ranger uranium milling operations

    International Nuclear Information System (INIS)

    Baily, P.A.

    1982-01-01

    The development and operation of the Ranger uranium project is described. In 1969 Ranger discovered a uranium-bearing ore deposit in the Alligator Rivers Region of the Northern Territory of Australia. Extensive testwork on drill core samples proved the viability of the extraction of the uranium and a process flowsheet and plant design criteria were developed based on a conventional crushing, grinding, acid leach, C.C.D., solvent extraction circuit. Detailed design concentrated on plant layout, materials of construction, equipment vendor selection and process control. These factors required special attention because of the remote location of the mine and the high cost and difficulty in obtaining trained labour for such sites. Environmental considerations were key factors in design. The mine is located adjacent to a national park and has an average rainfall of 1,600 mm. No water or liquid effluents are to be released from the project area and thus water management is a key factor. Tailings are ponded in an impervious earth-rockfill dam

  2. ERA's Ranger uranium mine

    International Nuclear Information System (INIS)

    Davies, W.

    1997-01-01

    Energy Resource of Australia (ERA) is a public company with 68% of its shares owned by the Australian company North Limited. It is currently operating one major production centre - Ranger Mine which is 260 kilometres east of Darwin, extracting and selling uranium from the Ranger Mine in the Northern Territory to nuclear electricity utilities in Japan, South Korea, Europe and North America. The first drum of uranium oxide from Ranger was drummed in August 1981 and operations have continued since that time. ERA is also in the process of working towards obtaining approvals for the development of a second mine - Jabiluka which is located 20 kilometres north of Ranger. The leases of Ranger and Jabiluka adjoin. The Minister for the Environment has advised the Minister for Resources and Energy that there does not appear to be any environmental issue which would prevent the preferred Jabiluka proposal from proceeding. Consent for the development of ERA's preferred option for the development of Jabiluka is being sought from the Aboriginal Traditional Owners. Ranger is currently the third largest producing uranium mine in the world producing 4,237 tonnes of U 3 O 8 in the year to June 1997

  3. ERA`s Ranger uranium mine

    Energy Technology Data Exchange (ETDEWEB)

    Davies, W. [Energy Resources of Australia Ltd., Sydney, NSW (Australia)

    1997-12-31

    Energy Resource of Australia (ERA) is a public company with 68% of its shares owned by the Australian company North Limited. It is currently operating one major production centre - Ranger Mine which is 260 kilometres east of Darwin, extracting and selling uranium from the Ranger Mine in the Northern Territory to nuclear electricity utilities in Japan, South Korea, Europe and North America. The first drum of uranium oxide from Ranger was drummed in August 1981 and operations have continued since that time. ERA is also in the process of working towards obtaining approvals for the development of a second mine - Jabiluka which is located 20 kilometres north of Ranger. The leases of Ranger and Jabiluka adjoin. The Minister for the Environment has advised the Minister for Resources and Energy that there does not appear to be any environmental issue which would prevent the preferred Jabiluka proposal from proceeding. Consent for the development of ERA`s preferred option for the development of Jabiluka is being sought from the Aboriginal Traditional Owners. Ranger is currently the third largest producing uranium mine in the world producing 4,237 tonnes of U{sub 3}O{sub 8} in the year to June 1997.

  4. Ranger uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    This agreement between the Commonwealth of Australia, Peko-Wallsend Operations Ltd., Electrolytic Zinc Company of Australasia Limited, and the Australian Atomic Energy Commission sets out articles under which the Ranger uranium project in the Northern Territory of Australia is to be operated

  5. The History of the 2nd Ranger Company

    National Research Council Canada - National Science Library

    Bond, Victor

    2003-01-01

    The purpose of this research project is to uncover the history of the 2nd Ranger Company and to determine the impact segregation had on the selection, training, and combat operations of the 2nd Ranger Company...

  6. The contribution of the Ranger Uranium Mine to the Northern Territory and Australian economy

    International Nuclear Information System (INIS)

    1993-09-01

    This is the report of a study by ACIL Economics and Policy Pty Ltd (ACIL) which estimates the contribution of the fist eleven years of the Ranger uranium project to the Northern Territory and Australian economies. It looks at the purchases and sales by the Company and the contributions of the project to tourism, the town of Jabiru, scientific work and royalty and taxation revenues. In the process it also assembles the available data on monies that have flowed from Ranger operations to the Aboriginal people of the Northern Territory. The analyses in intended to enable Ranger's contribution to be compared with that of other activities in the economy. Thus care has been taken to employ accepted national accounting definitions and to apply a degree of rigor which ensures that the figures generated are meaningful in relation to the official statistics covering the economy which are produced by the Australian Bureau of Statistics. Besides analysing the net economic contribution of Ranger, the report looks at certain distributional aspects, in particular the impact on Aboriginal people. The vast majority of Ranger's value-added contribution has been in a form that appears in ERA's accounts. Side-benefits estimated to have been generated through supplying infrastructure used by Kakadu tourist, excess-payments for town-building and its contribution through the existence of the Office of the Supervising Scientist have been significant in absolute terms, but over the mine's life so far these side-benefits have not added more than five per cent to the mine's GDP contribution. 20 tabs., 3 figs

  7. Some design and operating aspects of the Ranger uranium mine treatment plant

    International Nuclear Information System (INIS)

    Baily, P.A.

    1984-01-01

    Environmental considerations were key factors in the design of the Ranger Uranium Mines treatment plant. The mine is located adjacent to the Kakadu National Park and has an average rainfall of 1.6m per annum. No contaminated water or liquid effluents are to be released from the project area and thus water management is a key design and operating fact. Particulate and gas emission criteria influenced design as did occupational hygiene factors (dust, radon, housekeeping, maintenance access). Equipment selection and engineering standards were conservative and resulted in the plant attaining design performance in less than three months from the date of commissioning. A number of mechanical and operational problems were experienced. However, none of these problems have had a significant effect on production

  8. 78 FR 48205 - Ranger Alternative Management, L.P. and Ranger Funds Investment Trust; Notice of Application

    Science.gov (United States)

    2013-08-07

    ... Alternative Management, L.P. and Ranger Funds Investment Trust; Notice of Application August 1, 2013. AGENCY... Management, L.P. (``Ranger'') and Ranger Funds Investment Trust (the ``Trust''). Summary of Application... (e) certain registered management investment companies and unit investment trusts outside of the same...

  9. The economic impact on Aboriginal communities of the Ranger Project: 1979-1985

    International Nuclear Information System (INIS)

    O'Faircheallaigh, C.

    1986-01-01

    What are the benefits generated for Aboriginal people by mining projects like the Ranger Project? Are these projects likely to fulfill the expectations of Aborigines who support the controlled exploitation of mineral resources on their land? This article examines the economic impact of the Ranger uranium project on Aboriginal people. Its principal aim is to provide detailed information on the use of royalty-related payments made to traditional owners as a result of Ranger's operations, and the consequent employment, training and social service opportunities for Aborigines

  10. Allegheny County Park Rangers Outreach

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Launched in June 2015, the Allegheny County Park Rangers program reached over 48,000 people in its first year. Park Rangers interact with residents of all ages and...

  11. RangerMaster trademark: Real-time pattern recognition software for in-field analysis of radiation sources

    International Nuclear Information System (INIS)

    Murray, W.S.; Ziemba, F.; Szluk, N.

    1998-01-01

    RangerMaster trademark is the embedded firmware for Quantrad Sensor's integrated nuclear instrument package, the Ranger trademark. The Ranger trademark, which is both a gamma-ray and neutron detection system, was originally developed at Los Alamos National Laboratory for in situ surveys at the Plutonium Facility to confirm the presence of nuclear materials. The new RangerMaster trademark software expands the library of isotopes and simplifies the operation of the instrument by providing an easy mode suitable for untrained operators. The expanded library of the Ranger trademark now includes medical isotopes 99 Tc, 201 Tl, 111 In, 67 Ga, 133 Xe, 103 Pa, and 131 I; industrial isotopes 241 Am, 57 Co, 133 Ba, 137 Cs, 40 K, 60 Co, 232 Th, 226 Ra, and 207 Bi; and nuclear materials 235 U, 238 U, 233 U, and 239 Pu. To accomplish isotopic identification, a simulated spectrum for each of the isotopes was generated using SYNTH. The SYNTH spectra formed the basis for the knowledge-based expert system and selection of the regions of interest that are used in the pattern recognition system. The knowledge-based pattern recognition system was tested against actual spectra under field conditions

  12. RangerMasterTM: real-time pattern recognition software for in-field analysis of radiation sources

    International Nuclear Information System (INIS)

    Murray, W.S.; Ziemba, F.; Szluk, N.

    1998-01-01

    RangerMaster TM is the embedded firmware for Quantrad Sensor's integrated nuclear instrument package, the Ranger TM . The Ranger TM , which is both a gamma-ray and neutron detection system, was originally developed at Los Alamos National Laboratory for in situ surveys at the Plutonium Facility to confirm the presence of nuclear materials. The new RangerMaster TM software expands the library of isotopes and simplifies the operation of the instrument by providing an 'easy' mode suitable for untrained operators. The expanded library of the Ranger TM now includes medical isotopes 99 Tc, 201 Tl, 111 In, 67 Ga, 133 Xe, 103 Pa, and 131 I; industrial isotopes 241 Am, 57 Co, 133 Ba, 137 Cs, 40 K, 60 Co, 232 Th, 226 Ra, and 207 Bi; and nuclear materials 235 U, 238 U, 233 U, and 239 Pu. To accomplish isotopic identification, a simulated spectrum for each of the isotopes was generated using SYNTH 2 . The SYNTH spectra formed the basis for the knowledge-based expert system and selection of the regions of interest that are used in the pattern recognition system. The knowledge-based pattern recognition system was tested against actual spectra under field conditions. (author)

  13. 78 FR 69147 - Ranger Alternative Management, L.P. and Ranger Funds Investment Trust; Notice of Application

    Science.gov (United States)

    2013-11-18

    ...] Ranger Alternative Management, L.P. and Ranger Funds Investment Trust; Notice of Application November 12... Application: Applicants request an order that would permit (a) certain open-end management investment... Units; and (e) certain registered management investment companies and unit investment trusts outside of...

  14. Environmental auditing at Ranger

    International Nuclear Information System (INIS)

    Armstrong, A.; Reid, A.

    1989-01-01

    A preliminary external audit was carried out on three aspects of the Ranger Environmental Impact Statement (EIS), namely meteorological data, water release and water quality of releases. It assessed the accuracy of forecasts and predictive data statements against the actual environmental data obtained during operations, and concluded that impacts of the project were adequately described but inadequately quantified. The second state of the auditing is concerned with the assessment of the effectiveness of practices and procedures which are integrated into the ongoing environmental management program. 7 tabs. 2 figs

  15. Expansion of the ore treatment plant at Ranger Uranium Mines at Jabiru, NT Australia

    International Nuclear Information System (INIS)

    Nice, R.W.; Banaczkowski, M.

    2000-01-01

    The Ranger Uranium Mine commenced processing ore in 1980. The original plant designed by the joint venture between Davy and Wright Engineers had been designed to treat 1.3 Mtpa of ore to produce 3500 tpa of U 3 O 8 concentrates. The plant operated successfully through good and bad years until the 1995 when the owners of Energy Resources of Australia, North Ltd. (70%) decided that there was a market opening to allow expansion of the treatment plant such that it would produce 6000 tpa of concentrate.The desire to produce more concentrates was market driven but the change from the mine Ranger 1 to a new pit Ranger 3 also necessitated the inclusion of the ability to treat more ore. This involved the installation of more grinding and CCD washing capacity. There were some other changes that were to be included into the expansion to overcome operating deficiencies, reduce operating costs and to generally make the operation easier.The Australian engineering company, Kvaerner Davy, was commissioned to provide the EPCM services to the clients, North and the Ranger Operation Group. North Technical Services managed the Project with considerable input from the site operating and maintenance personnel. The site operating personnel commissioned the plant and are successfully operating it at the time of the preparation of this paper. The first part of this paper presents the basic process related activities required to provide the expanded facilities. This includes the flowsheet modifications, equipment changes and new equipment procured. Additionally, a discussion is given regarding the P and ID changes, the piping modifications and the means to install the expanded facilities with a minimum of interruption to the continuing plant operation. A second part of the paper details some of the experiences gained while constructing the expansion and commissioning and operating the expanded plant. (author)

  16. The Ranger project - a case study

    International Nuclear Information System (INIS)

    Young, R.I.

    1983-01-01

    Ranger Uranium Mines Pty. Ltd. operates an open pit mine and ore treatment plant in the Northern Territory designed to produce 3000 tonne/yr of U 3 O 8 from 3500 tonne/day of mill feed. The construction of the project was completed in 1981. Wright-Davy were the project managers and designers of the $270 million ore treatment plant and associated infrastructure. Details of project cost, staffing, project design and project systems are given

  17. Managing the Ranger uranium mine in the Alligator Rivers Region -there is much more to this business enterprise than just production

    International Nuclear Information System (INIS)

    Leggate, J.

    1984-01-01

    Environmental protection is very closely and continuously regulated at the Ranger uranium mine. Since the commencement of operations at Ranger the company has operated within these regulations and demonstrated clearly that yellowcake can be produced efficiently, economically and safely. The company also recognises that in order to ensure continuity of production, it will have to continue to operate within these strictly supervised regulations

  18. Opportunities for Ranger and Jabiluka

    International Nuclear Information System (INIS)

    Oxnam, K.M.

    1999-01-01

    The processing of ore from ERA's Ranger mine will be completed before 2009, so the development of the Company's Jabiluka project is vital to its future. In order to achieve the Company's aim of utilising the Ranger mill to process the Jabiluka ore ERA is looking at innovative ways of furthering community relationships and responding to the needs of its major stakeholders, particularly the local Aboriginal landowners. The Jabiluka development has been a trigger for ERA to reconsider the way it does business in order to meet expectations of the community while maintaining financial viability

  19. Sustainable Building Operation

    DEFF Research Database (Denmark)

    Jensen, Jesper Ole

    2009-01-01

    of sustainable building operation and a survey amongst building administrators from the private and the social housing sector. Our results show that there are many good examples on sustainable building operation in Danish housing estates, where local building managers, residents etc. have gained impressive......Energy-savings in the existing building stock have becomes a main goal in national and international policies. Often focus is on building-renovations, whereas the potential of sustainable building operation to a large extent has been neglected. Nevertheless, international research as well...... as practical experiences from Danish housing estates indicates that there are large potentials for energy savings by focusing on the operation of the buildings. We suggest that in order to achieve sustainability in the existing housing, renovation and operations should be seen as integrated parts...

  20. Are ranger patrols effective in reducing poaching-related threats within protected areas?

    Science.gov (United States)

    Moore, Jennnifer F.; Mulindahabi, Felix; Masozera, Michel K.; Nichols, James; Hines, James; Turikunkiko, Ezechiel; Oli, Madan K.

    2018-01-01

    Poaching is one of the greatest threats to wildlife conservation world-wide. However, the spatial and temporal patterns of poaching activities within protected areas, and the effectiveness of ranger patrols and ranger posts in mitigating these threats, are relatively unknown.We used 10 years (2006–2015) of ranger-based monitoring data and dynamic multi-season occupancy models to quantify poaching-related threats, to examine factors influencing the spatio-temporal dynamics of these threats and to test the efficiency of management actions to combat poaching in Nyungwe National Park (NNP), Rwanda.The probability of occurrence of poaching-related threats was highest at lower elevations (1,801–2,200 m), especially in areas that were close to roads and tourist trails; conversely, occurrence probability was lowest at high elevation sites (2,601–3,000 m), and near the park boundary and ranger posts. The number of ranger patrols substantially increased the probability that poaching-related threats disappear at a site if threats were originally present (i.e. probability of extinction of threats). Without ranger visits, the annual probability of extinction of poaching-related threats was an estimated 7%; this probability would increase to 20% and 57% with 20 and 50 ranger visits per year, respectively.Our results suggest that poaching-related threats can be effectively reduced in NNP by adding ranger posts in areas where they do not currently exist, and by increasing the number of patrols to sites where the probability of poaching activities is high.Synthesis and applications. Our application of dynamic occupancy models to predict the probability of presence of poaching-related threats is novel, and explicitly considers imperfect detection of illegal activities. Based on the modelled relationships, we identify areas that are most vulnerable to poaching, and offer insights regarding how ranger patrols can be optimally deployed to reduce poaching-related threats and

  1. The radiological impact of the Ranger Uranium Mine on the general public in Jabiru

    International Nuclear Information System (INIS)

    Kavasnicka, Jiri

    1992-01-01

    Potential alpha energy concentrations (PAEC) of radon daughters were monitored by a Kodak LR 115 nuclear track detector both outdoors and indoors in Jabiru (a township 9 km west of the Ranger Uranium Mine) at five locations between Ranger and Jabiru during the 1989 Dry Season. The average outdoor PAEC and the indoor PAEC in private dwellings in Jabiru were 2.4 ± 0.2 mWL and 2.4 ± 0.7 mWL respectively. Though the total radon emission from the Ranger Uranium Mine (RUM) project is relatively high (about 7 MBq s -1 ) the mining and milling of uranium contributes only marginally to the PAEC in Jabiru as can be seen from results of the air dispersion modelling and environmental radon daughter monitoring carried out in parallel with the indoor monitoring in Jabiru. The description of the radon daughter monitor and the major characteristics of the RUM project are given in the Appendixes. The average annual PAEC in Jabiru attributable t the mining and milling operations at Ranger was calculated to be about 0.16 mWL, which corresponds to an effective dose equivalent of 0.07 mSv y -1 (7% of the 1 mSv y -1 public limit) for members of the public in Jabiru. 17 refs., 3 tab., 7 figs

  2. Management of Ranger uranium mine waters, Kakadu Region, Northern Territory, Australia

    International Nuclear Information System (INIS)

    Hallenstein, C.; Bastias, J.

    1988-01-01

    The objectives, development and operation of the Ranger Uranium Mine's water management system are discussed. The discharge standards for release of excess mine water to Magela Creek are described and mine water quality data presented. It can be confidently concluded that controlled release will not cause detriment to the aquatic ecosystems of the Kakadu region. 4 refs., 1 fig., 3 tabs

  3. The application of image processing in the measurement for three-light-axis parallelity of laser ranger

    Science.gov (United States)

    Wang, Yang; Wang, Qianqian

    2008-12-01

    When laser ranger is transported or used in field operations, the transmitting axis, receiving axis and aiming axis may be not parallel. The nonparallelism of the three-light-axis will affect the range-measuring ability or make laser ranger not be operated exactly. So testing and adjusting the three-light-axis parallelity in the production and maintenance of laser ranger is important to ensure using laser ranger reliably. The paper proposes a new measurement method using digital image processing based on the comparison of some common measurement methods for the three-light-axis parallelity. It uses large aperture off-axis paraboloid reflector to get the images of laser spot and white light cross line, and then process the images on LabVIEW platform. The center of white light cross line can be achieved by the matching arithmetic in LABVIEW DLL. And the center of laser spot can be achieved by gradation transformation, binarization and area filter in turn. The software system can set CCD, detect the off-axis paraboloid reflector, measure the parallelity of transmitting axis and aiming axis and control the attenuation device. The hardware system selects SAA7111A, a programmable vedio decoding chip, to perform A/D conversion. FIFO (first-in first-out) is selected as buffer.USB bus is used to transmit data to PC. The three-light-axis parallelity can be achieved according to the position bias between them. The device based on this method has been already used. The application proves this method has high precision, speediness and automatization.

  4. High Precision Ranging and Range-Rate Measurements over Free-Space-Laser Communication Link

    Science.gov (United States)

    Yang, Guangning; Lu, Wei; Krainak, Michael; Sun, Xiaoli

    2016-01-01

    We present a high-precision ranging and range-rate measurement system via an optical-ranging or combined ranging-communication link. A complete bench-top optical communication system was built. It included a ground terminal and a space terminal. Ranging and range rate tests were conducted in two configurations. In the communication configuration with 622 data rate, we achieved a two-way range-rate error of 2 microns/s, or a modified Allan deviation of 9 x 10 (exp -15) with 10 second averaging time. Ranging and range-rate as a function of Bit Error Rate of the communication link is reported. They are not sensitive to the link error rate. In the single-frequency amplitude modulation mode, we report a two-way range rate error of 0.8 microns/s, or a modified Allan deviation of 2.6 x 10 (exp -15) with 10 second averaging time. We identified the major noise sources in the current system as the transmitter modulation injected noise and receiver electronics generated noise. A new improved system will be constructed to further improve the system performance for both operating modes.

  5. Rangers Lead the Way: The Vision of General Creighton W. Abrams

    National Research Council Canada - National Science Library

    Woods, Kent

    2003-01-01

    .... A restoration which was key to the Army emerging from its post Viet Nam period of decline. The values and standards incorporated in the Ranger Battalions were promulgated throughout the rest of the Army by Rangers returning...

  6. Hydrology of Ranger land application area

    International Nuclear Information System (INIS)

    McQuade, C.V.

    1992-01-01

    In 1984 Ranger Uranium Mines (RUM) began assessing the technique of water treatment by land application as a means of reducing the volume of stored water within the Restricted Release Zone. Knowledge of the hydrological characteristics of the treatment site is necessary for optimal day to day and season to season operation of the system and as an input into the assessment of the long-term viability of the site. This paper provides background information on the hydrological requirements for a water treatment site, describes the RUM's water treatment by land application system and summarises the operational statistics and current hydrological knowledge of the site. The general groundwater hydrology of the area comprises a surface soil aquifer overlying a semi-confined aquifer. Drainage of the surface aquifer follows the surface topography along the sandy clays. Vertical permeability ranges between 3 and 12 times greater than horizontal permeability. 7 refs., 2 tabs., 4 figs

  7. An assessment of the water management program proposed in the Ranger EIS and its environmental implications

    International Nuclear Information System (INIS)

    Davy, D.R.

    1976-01-01

    An assessment of the water management program proposed in the Ranger EIS has three components: a) a statement of water quality criteria and standards that the program must meet, b) a set of calculations based on the best available estimates, that compares the expected levels of waste with the standards set for the release, c) the plan of the surveillance program aimed at demonstrating compliance with these standards and at revealing deficiencies in the choice of criteria, the derivation of standards from them and unforseen departures from expectation. Standards are suggested for the operation of the Ranger mines based on the most restrictive criterion out of: (i) acute toxicity tests carried out on organisms and water from the Magela Creek combined with application factors recommended by AWRC, (ii) the results on indicator species and biological diversity indices for the Finniss river, (iii) requirements for agricultural and pastoral use, (iv) the requirements for portable water. It is expected that the program proposed by Ranger will meet these standards and it is concluded that planning for a comprehensive environmental program is adequate. (author)

  8. RELATIONSHIPS IN THE WORKPLACE AND OCCUPATIONAL ATTRACTIVENESS AMONG STUDENTS, TEACHERS AND RANGERS-SPORTSMEN

    Directory of Open Access Journals (Sweden)

    Nikolay Ivantchev

    2016-06-01

    Full Text Available Perceived occupational attractiveness could be due to many factors and relationships in the workplace are among them. The questionnaire “Attractiveness of the profession” created by Ivanov (1999 was used to study how relationships in the workplace were related to perceptions of occupational attractiveness among students, teachers and rangers-sportsmen participating in special missions abroad. In 2012 and 2013, 46 secondary school teachers, 40 students in pedagogical specialties, and 27 sportsmen-rangers participating in special missions abroad were studied in Bulgaria. The results indicated that the students and the rangers were more satisfied with their work than the teachers were. The interpersonal relationships influenced mainly the students’ and rangers’ perceptions of occupational attractiveness. The rangers were more influenced by the relationships with the colleagues. The psycho-climate in the workplace was considered as more important by the rangers. The students were more influenced by the interpersonal communication at the workplace and their heads’ expertise. Some moderators of interpersonal relationships in the workplace were found – such as the tasks in the work, the prestige of occupation, the interaction between occupation and rewards, and the psycho-climate in the workplace.

  9. 78 FR 38287 - Bitterroot National Forest, Darby Ranger District, Como Forest Health Project

    Science.gov (United States)

    2013-06-26

    ... DEPARTMENT OF AGRICULTURE Forest Service Bitterroot National Forest, Darby Ranger District, Como Forest Health Project AGENCY: Forest Service. ACTION: Notice; Correction. SUMMARY: The Department of Agriculture (USDA), Forest Service, Bitterroot National Forest, Darby Ranger District published a document in...

  10. 77 FR 58354 - Bend-Fort Rock Ranger District; Oregon; Withdrawal of Notice for Preparation of an Environmental...

    Science.gov (United States)

    2012-09-20

    ...-Fort Rock Ranger District; Oregon; Withdrawal of Notice for Preparation of an Environmental Impact... Administration, USDOT. ACTION: Notice of withdrawal. SUMMARY: The Bend-Fort Rock Ranger District and FHWA are..., Project Leader, Bend- Fort Rock Ranger District, 63095 Deschutes Market Road, Bend, OR 97701, phone 541...

  11. 76 FR 76689 - Cibola National Forest, Mount Taylor Ranger District, NM, Mount Taylor Combined Exploratory Drilling

    Science.gov (United States)

    2011-12-08

    ... National Forest, Mount Taylor Ranger District, NM, Mount Taylor Combined Exploratory Drilling AGENCY... proposed action is to approve two Plans of Operations for exploratory uranium drilling on the Cibola... San Mateo. In total, there are up to 279 drill holes that would be drilled over a period not to exceed...

  12. Application of best practicable technology to water management at Ranger Uranium mine: report of the technical working group

    International Nuclear Information System (INIS)

    1986-12-01

    An assessment is made of best practicable technology (BPT) as applied to the water management system of Ranger Uranium Mines for the period 1986-91. A specification of BPT cannot be made for the indefinite future because major changes in operation of the mine may occur which could have an impact on future water management. It is for these reasons that the period of detailed assessment has been limited to the next 5 years. For the purposes of the report, BPT is considered to be that technology relevant to the Ranger project which produced the minimum environmental pollution and degradation that can reasonably be achieved, having regard to a number of technical factors, including practice in uranium mining elsewhere in the world, cost, evidence of detriment or lack of it, project location and the age and effectiveness of equipment and facilities at Ranger. Three options are presented, in order of preference: no prohibition on release to Magela Creek, limitation on frequency of release to Magela Creek and prohibition on release to Magela Creek

  13. Ranger uranium environmental enquiry

    International Nuclear Information System (INIS)

    1976-07-01

    The submission is divided into three sections. Section A considers the international implications of the development of uranium resources including economic and resource aspects and environmental and social aspects. Section B outlines the government's position on export controls over uranium and its effect on the introduction of nuclear power in Australia. Section C describes the licensing and regulatory functions that would be needed to monitor the environmental and health aspects of the Ranger project. (R.L.)

  14. Radiation exposure of the public as a result of the present operations of Ranger Uranium Mines Pty Ltd

    Energy Technology Data Exchange (ETDEWEB)

    Koperski, J

    1986-04-01

    Ranger Uranium Mines monitors ambient levels of ionising radiation in accordance with the Code of Practice on Radiation Protection in the Mining and Milling of Radioactive Ores 1980. The radionuclides of interest are: U-238, Th-230, Ra-226, Pb-210, Po-210 and Rn-222 daughters (RnD). The aerial pathway appears to be the critical pathway for transfer of radioactive contaminants to the local population. The average annual effective dose equivalent rate to a member of the critical group from inhalation of long-lived radioactive dust is 0.22 +- 0.10 mSv/y, about 22 times below the limit of 5 mSv/y. No experimental evidence was found for any overall increase of exposure of the public due to consumption of bush food items collected in the vicinity of the Ranger site. The average exposure of the critical group member to RnD is likely to be 2.1 +- 3.1 mWLM/y, or 200 times below the annual limit of 0.4 WLM.

  15. RANGER-DTL 2.0: Rigorous Reconstruction of Gene-Family Evolution by Duplication, Transfer, and Loss.

    Science.gov (United States)

    Bansal, Mukul S; Kellis, Manolis; Kordi, Misagh; Kundu, Soumya

    2018-04-24

    RANGER-DTL 2.0 is a software program for inferring gene family evolution using Duplication-Transfer-Loss reconciliation. This new software is highly scalable and easy to use, and offers many new features not currently available in any other reconciliation program. RANGER-DTL 2.0 has a particular focus on reconciliation accuracy and can account for many sources of reconciliation uncertainty including uncertain gene tree rooting, gene tree topological uncertainty, multiple optimal reconciliations, and alternative event cost assignments. RANGER-DTL 2.0 is open-source and written in C ++ and Python. Pre-compiled executables, source code (open-source under GNU GPL), and a detailed manual are freely available from http://compbio.engr.uconn.edu/software/RANGER-DTL/. mukul.bansal@uconn.edu.

  16. A rainfall-based mechanism to regulate the release of water from Ranger uranium mine

    International Nuclear Information System (INIS)

    Carter, M.W.

    1989-01-01

    The far north of Australia (the Top End) has a monsoon-like climate. This wet-dry climate presents problems in water management for mining operations. These problems are exacerbated for the Ranger uranium mine at Jabiru due to the need to protect the environment of the surrounding Kakadu National Park, particularly the major wetland system downstream of the Ranger mine. An analysis of rainfall records for the wet-dry tropics of the far north of Australia is presented. A probability curve of the ratio between rainfall at a given date and rainfall at the year end, has been produced from actual data and can be used with a normalized curve to set levels of confidence of predicted rainfall being exceeded. The results of this analysis are used to develop a regulatory mechanism to limit release of waste water from a uranium mine to particularly wet years in accordance with the Australian Government's environmental protection policy. 19 refs., 11 tabs., 17 figs

  17. Age of uranium ores at Ranger and Jabiluka unconformity vein deposits, Northern Territory, Australia

    International Nuclear Information System (INIS)

    Ludwig, K.R.; Grauch, R.I.; Nutt, C.J.; Frishman, D.; Nash, J.T.; Simmons, K.R.

    1985-01-01

    The Ranger and Jabiluka uranium deposits are the largest in the Alligator Rivers Uranium Field (ARUF), which contains at least 20% of the world's low-cost uranium reserves. Ore occurs in early Proterozoic metasediments, below an unconformity with sandstones of the 1.65 Ga Kombolgie Formation. This study uses U-Pb isotope data from over 60 whole-rock drill core samples that contained a variety of mineral assemblages and textures. Data for Ranger samples indicate a well-defined age of 1.74 +/-.02 Ga. This 1.74 Ga age is distinctly pre-Kombolgie, so the Ranger deposit cannot have been formed by processes requiring its presence. This Ranger age is consistent, however, with mineralization related to heating associated with either the emplacement of early post-metamorphic granites, or possibly with intrusion of the nearby Oenpelli Dolerite. In contrast, data for the least-altered Jabiluka ores yield a concordia-intercept age of 1.44 +/-.02 Ga--significantly younger than the Ranger age, and also younger than the Komobolgie. This age may correspond to a regional thermal event, as indicated both by mafic dikes of roughly this age and a zircon lower-intercept age from a nearby granite-gneiss. Thus, together with the well-defined ∼900 Ma age of ores at the Nabarlek deposit, there are at least 3 distinct periods of major U-mineralization in the ARUF. Data for both Ranger and Jabiluka indicate the same, profound isotopic disturbance at some time in the interval of 0.4-0.6 Ga. Possibly this time corresponds to the development of basins and associated basalt flows to the W and SW, a suggested by Crick et. al. (1980)

  18. 77 FR 23658 - Six Rivers National Forest, Gasquet Ranger District, California, The Smith River National...

    Science.gov (United States)

    2012-04-20

    ... National Forest, Gasquet Ranger District, California, The Smith River National Recreation Area [email protected] . Please insure that ``Smith River NRA Restoration and Motorized Travel Management'' occurs... UARs totaling 80 miles. The project encompasses the Smith River NRA and Gasquet Ranger District...

  19. Land application at Ranger uranium mine, northern Australia: six years'review

    International Nuclear Information System (INIS)

    Noller, B.N.; Zhou, J.X.

    1992-01-01

    This report reviews the six years' practice of land application of waste water at the Ranger Uranium Mine, northern Australia. Elements of significance to the chemical impact on the environment by mining and milling at Ranger are analysed taking into consideration ore petrology and mineralogy, chemical compositions of rocks and ore, relative enrichment of different rock- and ore-forming elements, and the chemicals involved in the milling and extraction processes. Biogeochemistry of land application of waste water as an efficient environmental managing technique is discussed by analysing its biogeochemical cycles, variables which affect the biogeochemical processes, and aqueous chemistry. Data from monitoring of the soils, groundwater, biota, and seepage in the land application area at Ranger are collected and re-organised. A new approach to data presentation and interpretation is made based on the analysis of the most important variables which may affect the extent of the chemical impact of land application of waste water. The environmental impact of land application of waste water on soils, ground water, biota, and surface water (through seepage) is assessed accordingly. Uranium is retained in the near-surface soil layer while sulfate is present at lower depths. Manganese shows some mobility, appearing in depressions. Radium 226 shows no clear-cut relationship between location of soil sample and level. It is concluded that land application of waste water at Ranger has resulted in minimal environmental impact. 4 refs

  20. Conservation′s Ambiguities: Rangers on the Periphery of the W Park, Burkina Faso

    Directory of Open Access Journals (Sweden)

    Julie Poppe

    2012-01-01

    Full Text Available This article demonstrates the central role of ambiguity in the (reproduction process of conservation practice. It argues that some current political economy as well as environmentality approaches to research conservation practice fail to capture the complexity of the lived experience of local conservationists. The article focuses on the multiple identities of rangers in interaction with other residents at the periphery of the W Park in Burkina Faso, as rangers are local conservationists who simultaneously submit to and produce conservation practices. Park rangers are village men who are recruited under the banner of community participation in conservation projects and state forestry. On a day-to-day basis, these rangers help the foresters with the management of the natural resources on the one hand, and guide tourists, especially in the hunting concessions, on the other. They occupy ambiguous positions at the crossroads of conservationist, state, political, economic, spiritual, social, and cultural practices, inherent to their conservation occupations at the lowest echelon, where residents have to transform conservation policies into practices. It is precisely this ambiguity that turns out to ensure the conservation implementation.

  1. Ranger© - An Affordable, Advanced, Next-Generation, Dual-Pol, X-Band Weather Radar

    Science.gov (United States)

    Stedronsky, Richard

    2014-05-01

    The Enterprise Electronics Corporation (EEC) Ranger© system is a new generation, X-band (3 cm), Adaptive Polarization Doppler Weather Surveillance Radar that fills the gap between high-cost, high-power traditional radar systems and the passive ground station weather sensors. Developed in partnership with the University of Oklahoma Advanced Radar Research Center (ARRC), the system uses relatively low power solid-state transmitters and pulse compression technology to attain nearly the same performance capabilities of much more expensive traditional radar systems. The Ranger© also employs Adaptive Dual Polarization (ADP) techniques to allow Alternating or Simultaneous Dual Polarization capability with total control over the transmission polarization state using dual independent coherent transmitters. Ranger© has been designed using the very latest technology available in the industry and the technical and manufacturing experience gained through over four decades of successful radar system design and production at EEC. The entire Ranger© design concept emphasizes precision, stability, reliability, and value using proven solid state technology combined with the most advanced motion control system ever conceived for weather radar. Key applications include meteorology, hydrology, aviation, offshore oil/gas drilling, wind energy, and outdoor event situational awareness.

  2. Canadian Ranger Rifle: Human Factors Requirements Validation

    Science.gov (United States)

    2010-08-01

    index-eng.asp retrieved 9 February 2010 2 http://www.armee.forces.gc.ca/land-terre/cr-rc/history- histoire -eng.asp retrieved 9 February 2010 3 http... histoire -eng.asp Department of National Defence. (2010). Canadian Ranger Patrol (CRPG). Retrieved June 3, 2010, from http://www.army.forces.gc.ca

  3. Natural resources youth training program (NRYTP), resource rangers 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-09-15

    In 2010, for a second year, the natural resources youth training program (NRYTP) was developed in northern Manitoba thanks to Manitoba Keewatinowi Okimakanak Inc. (MKO) and the collaboration of 42 sponsors. 16 aboriginal youth representing six northern communities took part in the five-week program located at the Egg Lake camp. The objective was to provide these resources rangers with knowledge and training in the most widespread resource sectors in northern Manitoba, including mining, forestry and hydropower. Trainers and experts provided by industry partners offered training sessions, hands-on work experience and other activities to help resource rangers to acquire a better understanding of the employability in this field in the northern region and the knowledge and skills the resource-based careers require. Life and professional skills training was given by the camp staff and local professionals. On-site elders and cultural events also allowed the integration of a northern Cree cultural component. Three staff members, a cook and elders assisted daily the resource rangers. Many improvements and refinements have been made since the success of the 2009 program, including the involvement of a larger number of communities, program contributors and program graduates. The program length has doubled and the number of jobs created has increased, important cultural aspects were introduced and the overall expenses were reduced.

  4. 75 FR 14419 - Camp Tatiyee Land Exchange on the Lakeside Ranger District of the Apache-Sitgreaves National...

    Science.gov (United States)

    2010-03-25

    ... Ranger, Lakeside Ranger District, Apache-Sitgreaves National Forests, c/o TEC Inc., 514 Via de la Valle... to other papers serving areas affected by this proposal: Tucson Citizen, Sierra Vista Herald, Nogales...

  5. Mighty Morphin Power Ranger Play: Research and Reality.

    Science.gov (United States)

    Crosser, Sandra

    1995-01-01

    Explores the question of whether or not Mighty Morphin Power Rangers-type aggressive play is developmentally appropriate for the early childhood classroom. Compares results from research in child development to the reality of television programming, highlighting the relationship between television violence and children's aggressive behavior. (AA)

  6. The Ranger and Nabarlek mining agreements

    International Nuclear Information System (INIS)

    Gray, W.J.

    1980-01-01

    This article contains information about the content of the agreements which have been entered into between the Australian Government and the Northern Land Council in relation to the Ranger deposits in the Northern Territory and between the Government and Queensland Mines Limited and the N.L.C. in relation to the Nabarlek deposit. A statement by the Minister for Aboriginal Affairs on the impact of uranium mining on Northern Territory Aboriginals is included

  7. Rehabilitation of the Ranger Mine Site

    International Nuclear Information System (INIS)

    East, J.; Uren, C.; Cull, R.; Curley, P.; Unger, C.

    1989-01-01

    Designs for long-lived waste rock piles in tropical Australia need to consider the climatic factors affecting erosion. Erosion trials on four plots at the Ranger waste rock dump demonstrate that some features of natural stable landforms such as slope morphogenetic variables and the size characteristics of aerial cover of resistive rock particles on the surface, can be sucessfully used in the design of the waste rock piles. Preliminary results indicate that the erosional stability of slopes can be enhanced by the use of concave surfaces. ills., diagrams

  8. Ranger project starts-up amid doubts and optimism

    International Nuclear Information System (INIS)

    Gomez, B.

    1982-01-01

    After two and a half years construction and commissioning, the Ranger uranium project was officially opened on November 20, 1981. It was later closed for four days in connection with possible breaches of environmental regulations owing to the appearance of islands in the tailings dam. Contracts currently held represent a production commitment slightly in excess of the design capacity of the plant for the next decade

  9. Autonomous Navigation with Constrained Consistency for C-Ranger

    Directory of Open Access Journals (Sweden)

    Shujing Zhang

    2014-06-01

    Full Text Available Autonomous underwater vehicles (AUVs have become the most widely used tools for undertaking complex exploration tasks in marine environments. Their synthetic ability to carry out localization autonomously and build an environmental map concurrently, in other words, simultaneous localization and mapping (SLAM, are considered to be pivotal requirements for AUVs to have truly autonomous navigation. However, the consistency problem of the SLAM system has been greatly ignored during the past decades. In this paper, a consistency constrained extended Kalman filter (EKF SLAM algorithm, applying the idea of local consistency, is proposed and applied to the autonomous navigation of the C-Ranger AUV, which is developed as our experimental platform. The concept of local consistency (LC is introduced after an explicit theoretical derivation of the EKF-SLAM system. Then, we present a locally consistency-constrained EKF-SLAM design, LC-EKF, in which the landmark estimates used for linearization are fixed at the beginning of each local time period, rather than evaluated at the latest landmark estimates. Finally, our proposed LC-EKF algorithm is experimentally verified, both in simulations and sea trials. The experimental results show that the LC-EKF performs well with regard to consistency, accuracy and computational efficiency.

  10. Range Riders and Game Wardens: A Brief History of Fort Bragg’s Forest Ranger Program

    Science.gov (United States)

    2006-07-01

    Estelle Rowland and Evelyn Ellington. Infor- mal interviews were conducted with family members of former rangers, Myra Mort Hanni , Elizabeth McPherson, Dun...worked under the command of the sergeant whose family resided in the main house. As Myra Mott Hanni , daughter of 1920s ranger Sergeant John Sidney Mott...above as well as by Myra Mott Hanni who retains a photograph of her father standing next to a confiscated still. Wilson recalls finding stills on the

  11. Digital Handover of Data from Building Projects to Building Operation

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    pro-jects to building operation. This project started in 2004 with research and analyses fol-lowed by development of a proposal for client requirements and in 2005 a first test on a real construction project has been carried out. After revision of the requirements a second test will be started early...... and construction and on the other side in building opera-tion and facilities management. In Denmark the government has launched a development program called Digital Construction and one of the projects concerns specifying require-ments for building clients in relation to digital handover of data from construction...... by a consortium called DACaPo consisting of a building client/facilities manager, a consulting company, a contractor and a university institute. This paper presents some of the results from the project with the main focus on the initial research....

  12. NET-ZERO ENERGY BUILDING OPERATOR TRAINING PROGRAM (NZEBOT)

    Energy Technology Data Exchange (ETDEWEB)

    Brizendine, Anthony; Byars, Nan; Sleiti, Ahmad; Gehrig, Bruce; Lu, Na

    2012-12-31

    The primary objective of the Net-Zero Energy Building Operator Training Program (NZEBOT) was to develop certificate level training programs for commercial building owners, managers and operators, principally in the areas of energy / sustainability management. The expected outcome of the project was a multi-faceted mechanism for developing the skill-based competency of building operators, owners, architects/engineers, construction professionals, tenants, brokers and other interested groups in energy efficient building technologies and best practices. The training program draws heavily on DOE supported and developed materials available in the existing literature, as well as existing, modified, and newly developed curricula from the Department of Engineering Technology & Construction Management (ETCM) at the University of North Carolina at Charlotte (UNC-Charlotte). The project goal is to develop a certificate level training curriculum for commercial energy and sustainability managers and building operators that: 1) Increases the skill-based competency of building professionals in energy efficient building technologies and best practices, and 2) Increases the workforce pool of expertise in energy management and conservation techniques. The curriculum developed in this project can subsequently be used to establish a sustainable energy training program that can contribute to the creation of new “green” job opportunities in North Carolina and throughout the Southeast region, and workforce training that leads to overall reductions in commercial building energy consumption. Three energy training / education programs were developed to achieve the stated goal, namely: 1. Building Energy/Sustainability Management (BESM) Certificate Program for Building Managers and Operators (40 hours); 2. Energy Efficient Building Technologies (EEBT) Certificate Program (16 hours); and 3. Energy Efficent Buildings (EEB) Seminar (4 hours). Training Program 1 incorporates the following

  13. Chemical data and statistical interpretations for rocks and ores from the Ranger uranium mine, Northern Territory, Australia

    Science.gov (United States)

    Nash, J. Thomas; Frishman, David

    1983-01-01

    Analytical results for 61 elements in 370 samples from the Ranger Mine area are reported. Most of the rocks come from drill core in the Ranger No. 1 and Ranger No. 3 deposits, but 20 samples are from unmineralized drill core more than 1 km from ore. Statistical tests show that the elements Mg, Fe, F, Be, Co, Li, Ni, Pb, Sc, Th, Ti, V, CI, As, Br, Au, Ce, Dy, La Sc, Eu, Tb, Yb, and Tb have positive association with uranium, and Si, Ca, Na, K, Sr, Ba, Ce, and Cs have negative association. For most lithologic subsets Mg, Fe, Li, Cr, Ni, Pb, V, Y, Sm, Sc, Eu, and Yb are significantly enriched in ore-bearing rocks, whereas Ca, Na, K, Sr, Ba, Mn, Ce, and Cs are significantly depleted. These results are consistent with petrographic observations on altered rocks. Lithogeochemistry can aid exploration, but for these rocks requires methods that are expensive and not amenable to routine use.

  14. ERA Ranger tailings corridor review. Supervising Scientist report 154

    International Nuclear Information System (INIS)

    Merz, S.K.

    2000-01-01

    Sinclair Knight Merz (SKM) were commissioned by the Office of the Supervising Scientist on 25 May 2000 to undertake a review and complete a report on the tailings corridor at the ERA Ranger Mine. The objective of the study was to undertake an 'as is' and to some extent historic and look ahead, review of the corridor system sufficient to: assess the current suitability of key aspects of the design; assess the suitability of current operating, maintenance and system development regimes and responsibilities; and record any recommended actions or further investigations arising out of the review; in order to ensure the adequacy of the design, operation and maintenance. The scope of the study report was limited to the corridor itself, its associated sump and sump contents discharge and the branch corridors carrying pipelines to Pit 1. A representative report contents was discussed and agreed with the Office of the Supervising Scientist prior to commencement of the study and this is included as appendix A to this report. The originally agreed content is, with only minor amendment, reflected in this report. The study methodology comprised a review and assessment by SKM of the design of the existing system and current operations documentation and information obtained from investigations on site and discussions with ERA site personnel. Whilst, a number of modifications affecting the corridor are recommended for further consideration, the main findings of the report relate to operating and maintenance practices which should be adopted for the remainder of the mine/mill life

  15. Financing the Ranger uranium project

    International Nuclear Information System (INIS)

    Hodge, S.J.; Miskelly, N.

    1983-01-01

    Construction of the Ranger uranium project located 230 km east of Darwin in the Northern Territory commenced in January 1979. Energy Resources of Australia Ltd was incorporated in February 1980 to acquire all the rights in the project. The total cost to ERA of these rights was $407 million. In October 1980 ERA'S cash requirements were estimated to be $553 million. Overseas participants (power utilities who had agreed to purchase uranium yellowcake under contract) arranged to take up 25% of the equity capital, Peko-Wallsend Ltd and EZ Industries Ltd were allotted 30.5% each and 14% was issued to Australian residents. The loan and equity financing arrangements required the successful resolution of many complex and interlocking factors, including technical and economic feasibility, agreement with aboriginal interests, compliance with Government policies and securing of sales contracts

  16. Augmented reality building operations tool

    Science.gov (United States)

    Brackney, Larry J.

    2014-09-09

    A method (700) for providing an augmented reality operations tool to a mobile client (642) positioned in a building (604). The method (700) includes, with a server (660), receiving (720) from the client (642) an augmented reality request for building system equipment (612) managed by an energy management system (EMS) (620). The method (700) includes transmitting (740) a data request for the equipment (612) to the EMS (620) and receiving (750) building management data (634) for the equipment (612). The method (700) includes generating (760) an overlay (656) with an object created based on the building management data (634), which may be sensor data, diagnostic procedures, or the like. The overlay (656) is configured for concurrent display on a display screen (652) of the client (642) with a real-time image of the building equipment (612). The method (700) includes transmitting (770) the overlay (656) to the client (642).

  17. Activity-Tracking Service for Building Operating Systems

    DEFF Research Database (Denmark)

    Hviid, Jakob; Kjærgaard, Mikkel Baun

    2018-01-01

    of Things sensors and devices promise to deliver rich data about human activities and control of loads. However, existing proposals for building operating systems that should combine such data and control opportunities does not provide concepts and support for activity data. In this paper we propose...... an activity-tracking service for building operating systems. The service is designed to consider the security, privacy, integration, extendability and scalability challenges in the building setting. We provide initial findings for testing the system in a proof of concept evaluation using a set of common......Several high consuming electricity loads in retail stores are currently highly intertwined in human activities. Without knowledge of such activities it is difficult to improve the energy efficiency of the loads operation for sustainability and cost reasons. The increasing availability of Internet...

  18. Environmental impact of the Ranger uranium mine, Alligator Rivers Region, Northern Territory, Australia

    International Nuclear Information System (INIS)

    Johnston, A.; Needham, S.

    2002-01-01

    Stringent environmental controls have been applied to the Ranger mine, in the Northern Territory of Australia, because of its location in an area of outstanding natural and cultural values. The adjacent Kakadu National Park contains a wild and extensive biodiversity, striking landscapes, ancient Aboriginal rock art and a living Aboriginal culture. A special regime of biological, radiological and chemical monitoring has been applied to protect the environment and detect even very low intensity impacts. The results from this regime demonstrate to the government and general public that the high conservation values of the national park around the mine are being properly protected. This paper describes the techniques used to measure environmental impact at Ranger, and summarizes the results of over 20 years of monitoring. The overwhelming conclusion is that a very high standard of environmental protection has been achieved. (author)

  19. Special Operations Doctrine: Is it Needed

    Science.gov (United States)

    2016-12-07

    AOB), eight Special Forces Operational Detachment-Alphas (SFODAs)2, and Civil Affairs and Psychological Operations teams working alongside two bat...Operations doctrine. Sixty years after the Army’s first special operations units were formed, the time had arrived for writing how Army special operations...Affairs, Psychological Operations, and Special Forces, the effort inte- grated the roles and missions of the Ranger Regiment, Special Mission Units, and

  20. Knowledge transfer from building operation to construction

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Chatzilazarou, Stamatia

    2017-01-01

    Purpose: To investigate how knowledge that derives from operation and maintenance of buildings can be stored and transferred in order to be reused in a future building project? Design/methodology/approach: The paper is theoretically based on knowledge management with a particular focus...... on interdepartmental knowledge transfer between departments responsible for operation and management and departments responsible for building projects in organisations with large and fast changing building portfolios. The paper includes a case study of the FM organisation of the Technical University of Denmark...... with data collection mainly by interviews with managers and staff in the relevant departments in this organisation. Findings: The case organisation seems to be aware of the importance of sharing and transferring their organisational knowledge. Over the last five years, the organisation has developed...

  1. Operations and Maintenance Cost for Stratified Buildings: A Critical Review

    Directory of Open Access Journals (Sweden)

    Che-Ghani Nor Zaimah

    2016-01-01

    Full Text Available Building maintenance is essential in preserving buildings’ appearance and performance. It needs to upkeep the building performance to prolong its value and building life cycle. Malaysia is still lacking in managing cost for building operation and maintenance. It has been found that the cost for housing maintenance is high due to poor maintenance practices. In order to get better understanding on how to manage the cost, this study reviews the contributing factors that affecting operation and maintenance cost of stratified buildings in Malaysia. The research first identified the factors through extensive literature review and scrutinize on factors that affecting and can minimize operation and maintenance cost. This literature review offers insight into building maintenance scenario in Malaysia focusing on the issues and challenges. The study also finds that operation and maintenance cost for housing in Malaysia is still in poor state. Interestingly, this paper revealed that operation and maintenance cost is also influenced by three significant factors like expectation of tenants, building characteristics and building defects. Measures to reduce the housing operation and maintenance cost are also highlighted so that this study can be a stepping stone towards proposing efficient and effective facilities management strategies for affordable housing in future.

  2. 47 CFR 27.1330 - Local public safety build-out and operation.

    Science.gov (United States)

    2010-10-01

    ... public safety build-out and operation. (a) The Upper 700 MHz D Block licensee and the Operating Company... exclusive right to build and operate the Shared Wireless Broadband Network. (b) Rights to early build-out in... transfer and compensation to occur prior to the scheduled build out date for such network in the NSA. (ii...

  3. 47 CFR 90.1430 - Local public safety build-out and operation.

    Science.gov (United States)

    2010-10-01

    ... public safety build-out and operation. (a) The Upper 700 MHz D Block licensee and the Operating Company... exclusive right to build and operate the Shared Wireless Broadband Network. (b) Rights to early build-out in... transfer and compensation to occur prior to the scheduled build out date for such network in the NSA. (ii...

  4. Operational Command and Control: Lessons for Today's Joint Force from Grenada, Somalia, and Kosovo

    National Research Council Canada - National Science Library

    Foraker III, Joseph C

    2007-01-01

    This paper examines operational command and control issues encountered during Operation Urgent Fury in Grenada, the deployment of Task Force Ranger in Mogadishu, Somalia, and Operation Allied Force in Kosovo...

  5. Economic, social, and cultural aspects of livestock ranching on the Española and Canjilon Ranger Districts of the Santa Fe and Carson National Forests: a pilot study

    Science.gov (United States)

    Carol Raish; Alice M. McSweeney

    2003-01-01

    The ranches of northern New Mexico, composed of land and livestock, are integral components of family and community life. This pilot study examines current economic, social, and cultural aspects of livestock operations owned by ranchers with Federal grazing permits (permittees) on the Canjilon and Española Ranger Districts of the Santa Fe and Carson National...

  6. 75 FR 16728 - Beaver Creek Landscape Management Project, Ashland Ranger District, Custer National Forest...

    Science.gov (United States)

    2010-04-02

    ... DEPARTMENT OF AGRICULTURE Forest Service Beaver Creek Landscape Management Project, Ashland Ranger... manner that increases resiliency of the Beaver Creek Landscape Management Project area ecosystem to... requirements to require. The Beaver Creek Landscape Management Project includes treatments previously proposed...

  7. 76 FR 13344 - Beaver Creek Landscape Management Project, Ashland Ranger District, Custer National Forest...

    Science.gov (United States)

    2011-03-11

    ... DEPARTMENT OF AGRICULTURE Forest Service Beaver Creek Landscape Management Project, Ashland Ranger... Impact Statement for the Beaver Creek Landscape Management Project was published in the Federal Register... Responsible Official for the Beaver Creek Landscape Management Project. DATES: The Final Environmental Impact...

  8. Reassessment of Loblolly Pine Decline on the Oakmulgee Ranger District, Talladega National Forest, Alabama

    Science.gov (United States)

    Nolan J. Hess; William J. Otroana; John P. Jones; Arthur J. Goddard; Charles H. Walkinshaw

    1999-01-01

    Loblolly pine (Pinus taeda L.) decline has been a management concern on the Oakmulgee Ranger District since the 1960's. The symptoms include sparse crowns, reduced radial growth, deterioration of fine roots, decline, and mortality of loblolly pine by age 50.

  9. 78 FR 15681 - Beaverhead-Deerlodge National Forest, Dillon Ranger District; Montana; Birch, Willow, Lost Project

    Science.gov (United States)

    2013-03-12

    ... higher susceptibility to insect and disease such as mountain pine beetle and blister rust. Responsible... documentation. Dated: March 5, 2013. Cole Mayn, Acting Dillon District Ranger. [FR Doc. 2013-05574 Filed 3-11-13...

  10. 75 FR 8297 - Tongass National Forest, Thorne Bay Ranger District, Thorne Bay, AK

    Science.gov (United States)

    2010-02-24

    ..., Thorne Bay, AK AGENCY: Forest Service, USDA. ACTION: Cancellation of Notice of intent to prepare an... Roberts, Zone Planner, Thorne Bay Ranger District, Tongass National Forest, P.O. Box 19001, Thorne Bay, AK 99919, telephone: 907-828-3250. SUPPLEMENTARY INFORMATION: The 47,007-acre Kosciusko Project Area is...

  11. Modeling of HVAC operational faults in building performance simulation

    International Nuclear Information System (INIS)

    Zhang, Rongpeng; Hong, Tianzhen

    2017-01-01

    Highlights: •Discuss significance of capturing operational faults in existing buildings. •Develop a novel feature in EnergyPlus to model operational faults of HVAC systems. •Compare three approaches to faults modeling using EnergyPlus. •A case study demonstrates the use of the fault-modeling feature. •Future developments of new faults are discussed. -- Abstract: Operational faults are common in the heating, ventilating, and air conditioning (HVAC) systems of existing buildings, leading to a decrease in energy efficiency and occupant comfort. Various fault detection and diagnostic methods have been developed to identify and analyze HVAC operational faults at the component or subsystem level. However, current methods lack a holistic approach to predicting the overall impacts of faults at the building level—an approach that adequately addresses the coupling between various operational components, the synchronized effect between simultaneous faults, and the dynamic nature of fault severity. This study introduces the novel development of a fault-modeling feature in EnergyPlus which fills in the knowledge gap left by previous studies. This paper presents the design and implementation of the new feature in EnergyPlus and discusses in detail the fault-modeling challenges faced. The new fault-modeling feature enables EnergyPlus to quantify the impacts of faults on building energy use and occupant comfort, thus supporting the decision making of timely fault corrections. Including actual building operational faults in energy models also improves the accuracy of the baseline model, which is critical in the measurement and verification of retrofit or commissioning projects. As an example, EnergyPlus version 8.6 was used to investigate the impacts of a number of typical operational faults in an office building across several U.S. climate zones. The results demonstrate that the faults have significant impacts on building energy performance as well as on occupant

  12. Method for simulating predictive control of building systems operation in the early stages of building design

    DEFF Research Database (Denmark)

    Petersen, Steffen; Svendsen, Svend

    2011-01-01

    A method for simulating predictive control of building systems operation in the early stages of building design is presented. The method uses building simulation based on weather forecasts to predict whether there is a future heating or cooling requirement. This information enables the thermal...... control systems of the building to respond proactively to keep the operational temperature within the thermal comfort range with the minimum use of energy. The method is implemented in an existing building simulation tool designed to inform decisions in the early stages of building design through...... parametric analysis. This enables building designers to predict the performance of the method and include it as a part of the solution space. The method furthermore facilitates the task of configuring appropriate building systems control schemes in the tool, and it eliminates time consuming manual...

  13. Mine planning and scheduling at Ranger Uranium Mine - environmental requirements and economics

    International Nuclear Information System (INIS)

    Bath, L.J.

    1984-01-01

    Ranger Uranium Mines operates an open cut located in the Northern Territory. Strict environmental controls govern all operations and the water management requirements have the greatest impact on mine planning. The two main goals of planning are to provide mill feed and to mine sufficient suitable quality waste rock for ongoing construction of the tailings dam. Early planning concentrated on staged development of the pit to provide access to as much ore as possible for a given amount of development. All waste was considered to be suitable construction material. Grade control of crusher feed was the main problem in planning, as wide variations occur in ore grade over relatively short distances. Water management for the site operates a 'no release' system for contaminated waters. Design storage has proven inadequate, and the open cut has been used as the extra storage. As construction of future stages of the tailings dam requires non-mineralised rock materials which meet specific quality criteria, the mine has had to re-examine long term planning and pit development strategies. This has entailed the collection of much data not required under normal mining conditions, such as the assaying of waste drill core. The overall impact on mine planning of the environmental regulations has been to alter the philosophy of earlier planning, making it necessary to create a new strategy for pit development with the accent on exposing waste

  14. 78 FR 45495 - Conejos Peak Ranger District, Rio Grande National Forest; Colorado; Cumbres Vegetation Management...

    Science.gov (United States)

    2013-07-29

    ..., Team Leader, San Luis Valley Publ ic Land Center, 1803 W. Hwy 160, Monte Vista, CO 81144. Commen ts may... the long-term. Responsible Official Conejos Peak District Ranger at 15571 County Road T5, La J ara, CO...

  15. 75 FR 10456 - Kootenai National Forest, Fortine Ranger District, Montana; Galton Environmental Impact Statement

    Science.gov (United States)

    2010-03-08

    ...) Planning Areas (Wigwam, Grave, and Murphy) and the Fortine Ranger District portions of two (2) Planning... lawsuit settlement agreement with the Montana Wilderness Association commits the Forest Service to develop... travel planning for the Ten Lakes WSA. This project will also reduce hazardous fuels within and outside...

  16. 75 FR 3195 - Ochoco National Forest, Lookout Mountain Ranger District; Oregon; Mill Creek; Allotment...

    Science.gov (United States)

    2010-01-20

    ...; Oregon; Mill Creek; Allotment Management Plans EIS AGENCY: Forest Service, USDA. ACTION: Notice of intent... allotments on the Lookout Mountain Ranger District. These four allotments are: Cox, Craig, Mill Creek, and..., Mill Creek and Old Dry Creek allotments. The responsible official will also decide how to mitigate...

  17. Enhancement of building operations: A successful approach towards national electrical demand management

    International Nuclear Information System (INIS)

    Al-Mulla, A.; Maheshwari, G.P.; Al-Nakib, D.; ElSherbini, A.; Alghimlas, F.; Al-Taqi, H.; Al-Hadban, Y.

    2013-01-01

    Highlights: • Enhanced building operations were applied for eight large government buildings in Kuwait. • The enhanced building operations led to demand savings of 8.90 MW during the national peak hour. • Nationwide guidelines were developed for implementing the enhanced operations in similar government buildings in Kuwait. • The peak electrical demand reduction is likely to be 488 MW by the year 2030. - Abstract: An approach for managing electrical demand through enhanced building operations in hot climates is evaluated and demonstrated in this paper. The approach focuses on implementing enhanced operations in government buildings, since they are easier to implement and administer. These enhanced operations included early reduction of cooling supply before the end of the occupancy period, improved time-of-day control after occupancy period and reduced lighting. A total of eight government buildings with different construction and system characteristics were selected for implementing these enhanced operations. These buildings have a total air-conditioning area of 4.39 × 10 5 m 2 and a combined peak electrical demand of 29.3 MW. The enhanced operations resulted in demand savings of 8.90 MW during the national peak hour. Temperatures build up inside the buildings were monitored and found to be within acceptable ranges. Guidelines for nationwide implementation in similar buildings were developed based on the results of this work. Implementation is estimated to reduce demand by 488 MW by the year 2030, which amounts to capital savings of $585 million. These projected values would be important to adopt energy efficient policies for the country. Additional reductions in energy and fuel consumption are added benefits, which would result in large financial and environmental savings to the country. Moreover, the enhanced building operations would be an important tool to avoid any blackouts by properly reducing the peak electrical demand as well as operating the

  18. Investeren in build-operate-transfer projecten

    NARCIS (Netherlands)

    Beek, van Th.A.; Vrancken, B.P.E.

    1998-01-01

    De Build-Operate-Transfer (BOT) methode is een aanbestedingsmethode waarbij een consortium van bouwbedrijven een concessie-overeenkomst sluit met de overheid ten behoeve van een te realiseren infrastructuurvoorziening, waar geen overheidsbetaling tegenover staat. De concessiehouder is

  19. Spatiotemporal trends of illegal activities from ranger-collected data in a Ugandan national park.

    Science.gov (United States)

    Critchlow, R; Plumptre, A J; Driciru, M; Rwetsiba, A; Stokes, E J; Tumwesigye, C; Wanyama, F; Beale, C M

    2015-10-01

    Within protected areas, biodiversity loss is often a consequence of illegal resource use. Understanding the patterns and extent of illegal activities is therefore essential for effective law enforcement and prevention of biodiversity declines. We used extensive data, commonly collected by ranger patrols in many protected areas, and Bayesian hierarchical models to identify drivers, trends, and distribution of multiple illegal activities within the Queen Elizabeth Conservation Area (QECA), Uganda. Encroachment (e.g., by pastoralists with cattle) and poaching of noncommercial animals (e.g., snaring bushmeat) were the most prevalent illegal activities within the QECA. Illegal activities occurred in different areas of the QECA. Poaching of noncommercial animals was most widely distributed within the national park. Overall, ecological covariates, although significant, were not useful predictors for occurrence of illegal activities. Instead, the location of illegal activities in previous years was more important. There were significant increases in encroachment and noncommercial plant harvesting (nontimber products) during the study period (1999-2012). We also found significant spatiotemporal variation in the occurrence of all activities. Our results show the need to explicitly model ranger patrol effort to reduce biases from existing uncorrected or capture per unit effort analyses. Prioritization of ranger patrol strategies is needed to target illegal activities; these strategies are determined by protected area managers, and therefore changes at a site-level can be implemented quickly. These strategies should also be informed by the location of past occurrences of illegal activity: the most useful predictor of future events. However, because spatial and temporal changes in illegal activities occurred, regular patrols throughout the protected area, even in areas of low occurrence, are also required. © 2015 Society for Conservation Biology.

  20. Energy management handbook for building operating engineers student workbook

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The handbook provides operating engineers with the basic information needed to implement specific energy conservation opportunities, and additional information is presented relative to the formulation and development of the energy management plan. Chapters are entitled: The Need for Energy Management (International Factors, The US Energy Situation, Energy and the Building Owner); The Fundamentals of Energy Consumption in Buildings (Energy Basics, Heat Basics, Heat Flow and the Building Envelope, Air and Comfort, Factors Affecting Energy Use In Buildings); Principles of Energy Conservation (Building Energy Consumption Characteristics); Planning the Energy Management Program (Obtaining Commitment and Support, Establishing the Energy Use Index, Organizing to Develop the Plan, Developing and Implementing the Plan); Conducting a Survey of Facilities and Operations (The Energy Audit, Preparation of Building and Systems Profile, Measurement and Instrumentation); Guidelines for Energy Conservation (Operator ECO's, Owner ECO'S); Developing the Draft Final Plan (Analyze Survey Findings, Putting the Plan on Paper, Review and Submit); Implementing the Program (Developing the Final Plan, Implementing the Plan, Monitoring and Updating the Program). A glossary is included and specific information on degree days and cooling hours for some selected cities and a computer energy study data for the New York Hilton are included in appendices. (MCW)

  1. Operation and maintenance of the technical installations in buildings

    DEFF Research Database (Denmark)

    Nielsen, O.(red.)

    The report contains twelve papers from a seminar on operation and maintenance, held at the Danish Building Research Institute in October 1976. The papers deal, among other things, with dimensioning and balancing of pipesystems, design of ventilating systems for adequate operation and maintenance,......, cost and quality in maintenance, maintenance service companies, as well as organization and training for building services maintenance....

  2. 77 FR 18997 - Rim Lakes Forest Restoration Project; Apache-Sitgreavese National Forest, Black Mesa Ranger...

    Science.gov (United States)

    2012-03-29

    ... DEPARTMENT OF AGRICULTURE Forest Service Rim Lakes Forest Restoration Project; Apache-Sitgreavese National Forest, Black Mesa Ranger District, Coconino County, AZ AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The U.S. Forest Service (FS) will...

  3. 75 FR 31418 - Intermountain Region, Payette National Forest, Council Ranger District; Idaho; Mill Creek-Council...

    Science.gov (United States)

    2010-06-03

    ... Ranger District; Idaho; Mill Creek--Council Mountain Landscape Restoration Project AGENCY: Forest Service... the Mill Creek--Council Mountain Landscape Restoration Project. The approximate 51,900 acre project area is located about two miles east of Council, Idaho. The Mill Creek--Council Mountain Landscape...

  4. Building a Mechanism for the Function of an Innovation-Oriented Machine-Building Enterprise in Operating the Development

    Directory of Open Access Journals (Sweden)

    Boiarynova Кateryna О.

    2017-07-01

    Full Text Available The article is aimed at developing and substantiating a mechanism for the function of an innovation-oriented machine-building enterprise in operating the development in order to increase effectuality in the space of ecosystem of operation and to satisfy the economic interests of development. The article proposes a mechanism for the function of an innovation-oriented machine-building enterprise in operating the development, its structure and building based on a business model; operating the development through responsibility centers; functional transformation of economic interest of actors in the ecosystem of function into the economic interest of enterprise; use of economic-institutional regulators and management technologies. Implementation of the mechanism would ensure the value of enterprise, the ability to manage development with the prolonged satisfaction of the joint economic interest, the ability to operate the economic interest of actors in the ecosystem, and maintenance the development mode in the operating process. Prospect for further research will be development of technologies for implementation of the proposed mechanism in the machine-building enterprises.

  5. Occupational health and safety inspection of the Ranger Uranium Mine

    International Nuclear Information System (INIS)

    Rosen, R.

    1987-04-01

    The principal purpose of the inspection was to assess all aspects of occupational health and safety at the Ranger Uranium Mine. A major objective was to identify actual and potential hazards under normal and abnormal conditions, particularly in relation to those topics about which the unions had expressed some concern. An assessment was made of current safety policies, procedures and practices at the site; and, as far as practicable, those tasks which involved risks to workers were identified. The results and recommendations of the inspection are contained in this report

  6. Reducing the operational energy demand in buildings using building information modeling tools and sustainability approaches

    Directory of Open Access Journals (Sweden)

    Mojtaba Valinejad Shoubi

    2015-03-01

    Full Text Available A sustainable building is constructed of materials that could decrease environmental impacts, such as energy usage, during the lifecycle of the building. Building Information Modeling (BIM has been identified as an effective tool for building performance analysis virtually in the design stage. The main aims of this study were to assess various combinations of materials using BIM and identify alternative, sustainable solutions to reduce operational energy consumption. The amount of energy consumed by a double story bungalow house in Johor, Malaysia, and assessments of alternative material configurations to determine the best energy performance were evaluated by using Revit Architecture 2012 and Autodesk Ecotect Analysis software to show which of the materials helped in reducing the operational energy use of the building to the greatest extent throughout its annual life cycle. At the end, some alternative, sustainable designs in terms of energy savings have been suggested.

  7. Intelligent building operating technologies : a cost-effective reduction in building energy consumption[Business case for a climate change solution]. 2. ed.

    Energy Technology Data Exchange (ETDEWEB)

    Gilles, J.

    2004-04-01

    Much of the energy consumed in the commercial and institutional (C and I) buildings sector is wasted due to poor building operation. The sector accounts for 13 per cent of secondary energy use in Canada, and contributes about the same proportion of greenhouse gas (GHG) emissions. Energy use in this sector could be reduced if the operation of the buildings were improved. The CANMET Energy Technology Centre in Varennes, Quebec has developed a set of software solutions called Intelligent Building Operating Technologies to address this problem. The software program applies artificial intelligence algorithms to existing building energy management control systems to diagnose equipment and system problems. The software provides performance reports and allows the operator to optimize the operation of the building. The proposed control strategies could be applied to 60 per cent of the building surface area in Canada, resulting energy consumption reductions of 12 per cent annually, or 14 TWh of electricity and 1.5 billion cubic metres of natural gas. The savings amount to $1.8 billion and 7 Mt of GHG emissions annually. It was suggested that a national retro-commissioning program would eliminate the barriers to improving building operation and help research and development aimed at Intelligent Building Operating Technologies. 8 refs., 5 tabs., 3 figs.

  8. 78 FR 3879 - Ochoco National Forest, Paulina Ranger District; Oregon; Fox Canyon Cluster Allotment Management...

    Science.gov (United States)

    2013-01-17

    ... approximately 35 miles east of Prineville, south of Big Summit Prairie. The four allotments are Antler, Brush... other applicable legal requirements within the project area. Paulina Ranger District data indicates that throughout the project area, stream shade and bank stability do not meet Forest Plan standards. In addition...

  9. Robust Pose Estimation using the SwissRanger SR-3000 Camera

    DEFF Research Database (Denmark)

    Gudmundsson, Sigurjon Arni; Larsen, Rasmus; Ersbøll, Bjarne Kjær

    2007-01-01

    In this paper a robust method is presented to classify and estimate an objects pose from a real time range image and a low dimensional model. The model is made from a range image training set which is reduced dimensionally by a nonlinear manifold learning method named Local Linear Embedding (LLE)......). New range images are then projected to this model giving the low dimensional coordinates of the object pose in an efficient manner. The range images are acquired by a state of the art SwissRanger SR-3000 camera making the projection process work in real-time....

  10. 76 FR 22075 - Divide Ranger District, Rio Grande National Forest; CO; Black Mesa Vegetation Management Project

    Science.gov (United States)

    2011-04-20

    ... Ranger District, Rio Grande National Forest; CO; Black Mesa Vegetation Management Project AGENCY: Forest... Web site http://www.fs.usda.gov/riogrande under ``Land & Resource Management'', then ``Projects'' on... need for the Black Mesa Vegetation Management Project is move toward achieving long-term desired...

  11. 78 FR 4377 - Idaho Panhandle National Forests, Coeur d'Alene River Ranger District, Shoshone County, ID...

    Science.gov (United States)

    2013-01-22

    ... Ranger District, Shoshone County, ID; Beaver Creek Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The Forest Service will prepare an Environmental Impact Statement (EIS) on a proposal to accomplish vegetation management in the Beaver Creek...

  12. Advanced, Integrated Control for Building Operations to Achieve 40% Energy Saving

    Energy Technology Data Exchange (ETDEWEB)

    Lu, Yan; Song, Zhen; Loftness, Vivian; Ji, Kun; Zheng, Sam; Lasternas, Bertrand; Marion, Flore; Yuebin, Yu

    2012-10-15

    We developed and demonstrated a software based integrated advanced building control platform called Smart Energy Box (SEB), which can coordinate building subsystem controls, integrate variety of energy optimization algorithms and provide proactive and collaborative energy management and control for building operations using weather and occupancy information. The integrated control system is a low cost solution and also features: Scalable component based architecture allows to build a solution for different building control system configurations with needed components; Open Architecture with a central data repository for data exchange among runtime components; Extendible to accommodate variety of communication protocols. Optimal building control for central loads, distributed loads and onsite energy resource; uses web server as a loosely coupled way to engage both building operators and building occupants in collaboration for energy conservation. Based on the open platform of SEB, we have investigated and evaluated a variety of operation and energy saving control strategies on Carnegie Mellon University Intelligent Work place which is equipped with alternative cooling/heating/ventilation/lighting methods, including radiant mullions, radiant cooling/heating ceiling panels, cool waves, dedicated ventilation unit, motorized window and blinds, and external louvers. Based on the validation results of these control strategies, they were integrated in SEB in a collaborative and dynamic way. This advanced control system was programmed and computer tested with a model of the Intelligent Workplace's northern section (IWn). The advanced control program was then installed in the IWn control system; the performance was measured and compared with that of the state of the art control system to verify the overall energy savings great than 40%. In addition advanced human machine interfaces (HMI's) were developed to communicate both with building

  13. A Study to Compare the Cost of Operation and Maintenance in Green Building Index (GBI and Non-Green Building Index (Non-GBI Rated Building in Malaysia

    Directory of Open Access Journals (Sweden)

    Ping Lee Zheng

    2016-01-01

    Full Text Available Urges for sustainable development had pushed the government and professional bodies to respond and react by implementing regulations where possible to direct development in that manner. However, the outcome in most financial conferences and dialogues on sustainable buildings flagged on high construction and maintenance cost. Thus, this study is conducted to collect and analyze actual building operation and maintenance cost between GBI and Non-GBI rated buildings in Malaysia which are more than 2 years fully operated buildings. There are two categories of selected buildings which are residential and non-residential type of building. Each category of the building consists of similar building’s characteristic such as geographic location, mode of operation, building heights, total numbers of floors and units. The scope of building’s maintenance for this study is mainly on wear and tear of the wall painting, electrical light fittings, ceiling panels, roofing system and mechanical services like water pump system are recorded for their replacement frequency of service and the cost involved within a consistent period of 12 months operation at cost percentage saving of 78.9% and 40.4% for residential and non-residential buildings respectively compare against Non-GBI rated buildings. Electricity consumption for GBI rated buildings are lower than Non-GBI rated buildings which recorded at the cost variance of 23.8% and 6.3% and water consumption at 35.9% and 44.0% for the above mentioned two main categories of selected case study buildings. Results from this study conclude major savings on residential buildings category in term of maintenance cost and electricity consumption for GBI rated buildings. Whereby, non-residential category of buildings, GBI rated building had been proven to obtain significant savings in terms of maintenance cost and water consumption.

  14. Electron-Muon Ranger: performance in the MICE Muon Beam

    CERN Document Server

    Adams, D.; Vankova-Kirilova, G.; Bertoni, R.; Bonesini, M.; Chignoli, F.; Mazza, R.; Palladino, V.; de Bari, A.; Cecchet, G.; Capponi, M.; Iaciofano, A.; Orestano, D.; Pastore, F.; Tortora, L.; Kuno, Y.; Sakamoto, H.; Ishimoto, S.; Filthaut, F.; Hansen, O.M.; Ramberger, S.; Vretenar, M.; Asfandiyarov, R.; Bene, P.; Blondel, A.; Cadoux, F.; Debieux, S.; Drielsma, F.; Graulich, J.S.; Husi, C.; Karadzhov, Y.; Masciocchi, F.; Nicola, L.; Messomo, E.Noah; Rothenfusser, K.; Sandstrom, R.; Wisting, H.; Charnley, G.; Collomb, N.; Gallagher, A.; Grant, A.; Griffiths, S.; Hartnett, T.; Martlew, B.; Moss, A.; Muir, A.; Mullacrane, I.; Oates, A.; Owens, P.; Stokes, G.; Warburton, P.; White, C.; Adams, D.; Barclay, P.; Bayliss, V.; Bradshaw, T.W.; Courthold, M.; Francis, V.; Fry, L.; Hayler, T.; Hills, M.; Lintern, A.; Macwaters, C.; Nichols, A.; Preece, R.; Ricciardi, S.; Rogers, C.; Stanley, T.; Tarrant, J.; Watson, S.; Wilson, A.; Bayes, R.; Nugent, J.C.; Soler, F.J.P.; Cooke, P.; Gamet, R.; Alekou, A.; Apollonio, M.; Barber, G.; Colling, D.; Dobbs, A.; Dornan, P.; Hunt, C.; Lagrange, J-B.; Long, K.; Martyniak, J.; Middleton, S.; Pasternak, J.; Santos, E.; Savidge, T.; Uchida, M.A.; Blackmore, V.J.; Carlisle, T.; Cobb, J.H.; Lau, W.; Rayner, M.A.; Tunnell, C.D.; Booth, C.N.; Hodgson, P.; Langlands, J.; Nicholson, R.; Overton, E.; Robinson, M.; Smith, P.J.; Dick, A.; Ronald, K.; Speirs, D.; Whyte, C.G.; Young, A.; Boyd, S.; Franchini, P.; Greis, J.; Pidcott, C.; Taylor, I.; Gardener, R.; Kyberd, P.; Littlefield, M.; Nebrensky, J.J.; Bross, A.D.; Fitzpatrick, T.; Leonova, M.; Moretti, A.; Neuffer, D.; Popovic, M.; Rubinov, P.; Rucinski, R.; Roberts, T.J.; Bowring, D.; DeMello, A.; Gourlay, S.; Li, D.; Prestemon, S.; Virostek, S.; Zisman, M.; Hanlet, P.; Kafka, G.; Kaplan, D.M.; Rajaram, D.; Snopok, P.; Torun, Y.; Blot, S.; Kim, Y.K.; Bravar, U.; Onel, Y.; Cremaldi, L.M.; Hart, T.L.; Luo, T.; Sanders, D.A.; Summers, D.J.; Cline, D.; Yang, X.; Coney, L.; Hanson, G.G.; Heidt, C.

    2015-12-16

    The Muon Ionization Cooling Experiment (MICE) will perform a detailed study of ionization cooling to evaluate the feasibility of the technique. To carry out this program, MICE requires an efficient particle-identification (PID) system to identify muons. The Electron-Muon Ranger (EMR) is a fully-active tracking-calorimeter that forms part of the PID system and tags muons that traverse the cooling channel without decaying. The detector is capable of identifying electrons with an efficiency of 98.6%, providing a purity for the MICE beam that exceeds 99.8%. The EMR also proved to be a powerful tool for the reconstruction of muon momenta in the range 100-280 MeV/$c$.

  15. Electron-muon ranger: performance in the MICE muon beam

    International Nuclear Information System (INIS)

    Adams, D.; Barclay, P.; Bayliss, V.; Bradshaw, T.W.; Alekou, A.; Apollonio, M.; Barber, G.; Asfandiyarov, R.; Bene, P.; Blondel, A.; De Bari, A.; Bayes, R.; Bertoni, R.; Bonesini, M.; Blackmore, V.J.; Blot, S.; Bogomilov, M.; Booth, C.N.; Bowring, D.; Boyd, S.

    2015-01-01

    The Muon Ionization Cooling Experiment (MICE) will perform a detailed study of ionization cooling to evaluate the feasibility of the technique. To carry out this program, MICE requires an efficient particle-identification (PID) system to identify muons. The Electron-Muon Ranger (EMR) is a fully-active tracking-calorimeter that forms part of the PID system and tags muons that traverse the cooling channel without decaying. The detector is capable of identifying electrons with an efficiency of 98.6%, providing a purity for the MICE beam that exceeds 99.8%. The EMR also proved to be a powerful tool for the reconstruction of muon momenta in the range 100–280 MeV/c

  16. Water management at Ranger Uranium Mine

    International Nuclear Information System (INIS)

    Carron, K.J.

    1989-01-01

    The water management system at the Ranger Uranium Mine is described. Any water that may have come into contact with material containing more than 0.02% uranium must be retained within the Restricted Release zone (RRZ) from which no water may be released except under specified conditions and with the written approval of the Northern Territory supervising authority. The RRS contains the tailings dam, the mine pit and retention ponds 2 and 3. Outside the RR2, retention ponds 1 and 4 act as silt traps, allowing sediment to settle out prior to water discharge. The Office of Supervising Scientist has developed receiving waters quality standards for Magela Creek which are given in a table. There have now been established sufficient regulatory criteria to allow the release of waste water directly to Magela Creek without compromising the environment. Consideration of releases has been confined to the comparatively good quality run-off waters in the RRZ and no release of the more contaminated process and tailings water stream is contemplated

  17. Multifamily Building Operator Job/Task Analysis and Report: September 2013

    Energy Technology Data Exchange (ETDEWEB)

    Owens, C. M.

    2013-09-01

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Building Operator JTA identifies and catalogs all of the tasks performed by multifamily building operators, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  18. Building reactor operator sustain expert system with C language integrated production system

    International Nuclear Information System (INIS)

    Ouyang Qin; Hu Shouyin; Wang Ruipian

    2002-01-01

    The development of the reactor operator sustain expert system is introduced, the capability of building reactor operator sustain expert system is discussed with C Language Integrated Production System (Clips), and a simple antitype of expert system is illustrated. The limitation of building reactor operator sustain expert system with Clips is also discussed

  19. A quantum inspired model of radar range and range-rate measurements with applications to weak value measurements

    Science.gov (United States)

    Escalante, George

    2017-05-01

    Weak Value Measurements (WVMs) with pre- and post-selected quantum mechanical ensembles were proposed by Aharonov, Albert, and Vaidman in 1988 and have found numerous applications in both theoretical and applied physics. In the field of precision metrology, WVM techniques have been demonstrated and proven valuable as a means to shift, amplify, and detect signals and to make precise measurements of small effects in both quantum and classical systems, including: particle spin, the Spin-Hall effect of light, optical beam deflections, frequency shifts, field gradients, and many others. In principal, WVM amplification techniques are also possible in radar and could be a valuable tool for precision measurements. However, relatively limited research has been done in this area. This article presents a quantum-inspired model of radar range and range-rate measurements of arbitrary strength, including standard and pre- and post-selected measurements. The model is used to extend WVM amplification theory to radar, with the receive filter performing the post-selection role. It is shown that the description of range and range-rate measurements based on the quantum-mechanical measurement model and formalism produces the same results as the conventional approach used in radar based on signal processing and filtering of the reflected signal at the radar receiver. Numerical simulation results using simple point scatterrer configurations are presented, applying the quantum-inspired model of radar range and range-rate measurements that occur in the weak measurement regime. Potential applications and benefits of the quantum inspired approach to radar measurements are presented, including improved range and Doppler measurement resolution.

  20. Investigation of tailings water leak at the Ranger uranium mine. Supervising Scientist report 153

    International Nuclear Information System (INIS)

    2000-01-01

    The purpose of this report has been to investigate and report on the leak of water from the Tailings Water Return Pipe at the Ranger uranium mine during the 1999/2000 Wet season with specific reference to: the origin of the leak and the adequacy of remediation measures taken to prevent similar occurrences in the future; the extent to which the people and the environment of Kakadu National Park have been adversely affected by the leak and the extent to which Energy Resources of Australia has complied with the reporting requirements specified in the Environmental Requirements. It describes the outcomes of the investigation and makes recommendations to address deficiencies identified in the environmental management systems at Ranger and in the supervisory and regulatory regimes applied to Ranger by the Supervising Scientist and NTDME. It has been established that the volume of water that leaked from the tailings water return pipeline was about 2000 cubic metres during the 1999/2000 Wet season. Of this, only a small fraction, about 85 cubic metres, entered the culvert which flows to thc Corridor Creek Wetlands. The remainder was collected in the tailings corridor sump and returned to the water management system. The failure of the pipeline to contain tailings water would not on itself normally have resulted in the discharge of this water to the external environment. That the leaked water did reach the external environment is due to a failure of the bunded corridor system to fully contain any spilled water. The cause of this failure was that the engineered structure between the roadway and a culvert that drains water from the nearby waste rock dump was not impermeable.The statutory monitoring program has been found to be deficient in two ways. First, other than visual inspection, it has not been designed to include monitoring locations within secondary containment systems that would indicate the failure of primary containment systems. In the present case, no statutory

  1. Radioactive dust concentration around the Ranger uranium mine

    International Nuclear Information System (INIS)

    Kavasnicka, Jiri.

    1988-07-01

    Environmental dust sampling and wind direction/velocity monitory were carried out between July and November 1987 at five points around the Ranger Uranium Mines project near Jabiru, Northern Territory. The measured radioactive dust alpha activities in the air were used to calculate the radioactive dust source-term and develop a site-specific air dispersion model which takes the depletion of the dust plume into account. The above model was used to estimate the effective committed dose equivalent as 15 μSv/year to children in Jabiru East. This corresponds to an increase of 2.6 x 10 -4 Bq. m -3 in the annual average dust alpha activity above the natural background. The dose to the children in Jabiru is about 5 μSv/year, so that the critical group of the public is in Jabiru East. 12 refs., 11 tabs., 2 maps

  2. Application of a catchment evolution model to the prediction of long-term erosion on the spoil heap at Ranger uranium mine. Supervising Scientist report 132

    International Nuclear Information System (INIS)

    Willgoose, G.

    1998-01-01

    There is a need to assess the long-term stability of engineered landforms associated with the rehabilitation of Ranger Uranium Mine, Northern Territory, Australia, as it is a requirement that mill tailings must be contained for periods in excess of 1000 years. The geomorphic model, SIBERIA, is calibrated on hydrology and erosion data collected by a combination of monitoring and rainfall simulation experiments on the waste rock dumps of Ranger. Preliminary analysis of Ranger's preferred above-grade and below-grade rehabilitation options suggests that erosion of the order of 7-8 m will occur on the structure in a period of 1000 years. This depth of erosion may be sufficient to compromise the integrity of the containment. It is shown that SIBERIA has significant advantages over steady-state erosion models. Suggestions are made for the design that will enhance the stability of the structure and extend the structural life of the containment

  3. Non-radiological contaminants from uranium mining and milling at Ranger, Jabiru, Northern Territory, Australia.

    Science.gov (United States)

    Noller, B N

    1991-10-01

    Protection from the hazards from radioactivity is of prime importance in the management of uranium mine and mill wastes. Such wastes also contain non-radiological contaminants (heavy metals, acids and neutralising agents) which give rise to potential long-term health and environmental hazards and short-term hazards to the aquatic ecosystem, e.g. as a result of release of waste water. This study seeks to identify non-radiological contaminants (elements) transferred to waste water at the Ranger uranium mine/mill complex at Jabiru, which are likely to hazardous to the aquatic environment.The two principal sources of contaminants are: (i) ore and waste rock mobilised from mining; and (ii) process reagents used in the milling and mineral extraction process. These substances may or may not already be present in the natural environment but may lead to deleterious effects on the aquatic environment if increased above threshold levels.Rhenium, derived from the ore body, was found to be significantly enriched in waste water from Ranger, indicating its suitability as an indicator element for water originating from the mining and milling process, but only uranium, likewise derived from the ore, and magnesium, manganese and sulfur (as sulfate) from the milling process were found to be significant environmental contaminants.

  4. A comprehensive framework to quantify energy savings potential from improved operations of commercial building stocks

    International Nuclear Information System (INIS)

    Azar, Elie; Menassa, Carol C.

    2014-01-01

    While studies highlight the significant impact of actions performed by occupants and facility managers on building energy performance, current policies ignore the importance of human actions and the potential energy savings from a more efficient operation of building systems. This is mainly attributed to the lack of methods that evaluate non-technological drivers of energy use for large stocks of commercial buildings to support policy making efforts. Therefore, this study proposes a scientific approach to quantifying the energy savings potential due to improved operations of any stock of commercial buildings. The proposed framework combines energy modeling techniques, studies on human actions in buildings, and surveying and sampling methods. The contributions of this study to energy policy are significant as they reinforce the role of human actions in energy conservation, and support efforts to integrate operation-focused solutions in energy conservation policy frameworks. The framework's capabilities are illustrated in a case study performed on the stock of office buildings in the United States (US). Results indicate a potential 21 percent reduction in the current energy use levels of these buildings through realistic changes in current building operation patterns. - Highlights: • Human actions highly influence energy performance of commercial building stocks. • It is challenging to quantify operation-related energy savings potential. • The proposed framework quantifies potential energy savings from improved operations. • The framework can be applied on any stock of commercial buildings. • Applications include support for operation-focused solutions in energy policies

  5. Construction Operations Building Information Exchange (COBIE)

    Science.gov (United States)

    2007-06-01

    Swalley U.S. Department of State, Overseas Buildings Operations Toby Wilson U.S. Army, Corps of Engineers, Engineer R&D Center Jeff Wix AEC3 The...exchanged in COBIE. To map those information exchanges to the IFC model, the Information Delivery Manual (IDM) process [ Wix 2007] was also used. The...Folksonomy. Wikimedia Foundation. http://en.wikipedia.org/wiki/Folksonomy/, accessed 3 August 2007. Wix , Jeffrey. 2007. Information Delivery Manual

  6. Greenhouse gases emission assessment in residential sector through buildings simulations and operation optimization

    International Nuclear Information System (INIS)

    Stojiljković, Mirko M.; Ignjatović, Marko G.; Vučković, Goran D.

    2015-01-01

    Buildings use a significant amount of primary energy and largely contribute to greenhouse gases emission. Cost optimality and cost effectiveness, including cost-optimal operation, are important for the adoption of energy efficient and environmentally friendly technologies. The long-term assessment of buildings-related greenhouse gases emission might take into account cost-optimal operation of their energy systems. This is often not the case in the literature. Long-term operation optimization problems are often of large scale and computationally intensive and time consuming. This paper formulates a bottom-up methodology relying on an efficient, but precise operation optimization approach, applicable to long-term problems and use with buildings simulations. We suggest moving-horizon short-term optimization to determine near-optimal operation modes and show that this approach, applied to flexible energy systems without seasonal storage, have satisfactory efficiency and accuracy compared with solving problem for an entire year. We also confirm it as a valuable pre-solve technique. Approach applicability and the importance of energy systems optimization are illustrated with a case study considering buildings envelope improvements and cogeneration and heat storage implementation in an urban residential settlement. EnergyPlus is used for buildings simulations while mixed integer linear programming optimization problems are constructed and solved using the custom-built software and the branch-and-cut solver Gurobi Optimizer. - Highlights: • Bottom-up approach for greenhouse gases emission assessment is presented. • Short-term moving-horizon optimization is used to define operation regimes. • Operation optimization and buildings simulations are connected with modeling tool. • Illustrated optimization method performed efficiently and gave accurate results.

  7. Contingency planning and risk analysis for water and tailings management at Ranger Uranium Mines

    International Nuclear Information System (INIS)

    McNally, P.E.

    1986-01-01

    This paper describes some of the more likely risks and contingency procedures associated with the extremely variable monsoonal climate of the Alligator Rivers region in the Northern Territory in relation to the Ranger Uranium Mine. The tailings management system is basically a large storage impoundment and a reticulation system that delivers tailings sludge and recycles supernatant water. It is a closed circuit within the water management system and is dealt with as an integral part of that system

  8. Transferring Knowledge from Building Operation to Design: A literature review

    DEFF Research Database (Denmark)

    Rasmussen, Helle Lohmann; Jensen, Per Anker; Gregg, Jay Sterling

    . Knowing that the list lacks inputs from cultural and organizational theory, the paper suggests that further research should focus on taking these suggestions to an operational level for the benefit of FM, building clients and design teams. Furthermore, it is found that major concepts that could......As a solution to the previously identified gap between expected and actual building performance, this paper investigates how knowledge can be transferred from operation to design. This is assumed to help bridge the gap and increase the performance of new built facilities. By conducting a systematic...... literature review, it is found, that the theoretical approach in the reviewed articles has a significant impact on the level of how applicable the recommendations are in practice. Furthermore, a list of identified tools to enable knowledge transfer is provided, including POE, PPP and building commissioning...

  9. DTU says yes to operational friendly buildings but how should it be done in practice?

    DEFF Research Database (Denmark)

    Rasmussen, Helle Lohmann; Nielsen, Susanne Balslev; Møller, Anders B.

    2014-01-01

    Facilities managers often fight to be allowed to contribute their operational experiences to new building projects, but not at Campus Service of the Technical University of Denmark (DTU), where “ask the operations manager” has become a mantra for every building project in recent years, and there ......, and there are currently 15 building projects under way. But how is this knowledge transfer organized in practice so that both the buildings department and the operations department maintain a good and effective relationship?...

  10. ANALYSIS OF SUFFICIENCY OF THE BEARING CAPACITY OF BUILDING STRUCTURES OF OPERATING SITES OF MAIN BUILDINGS OF THERMAL POWER PLANTS

    Directory of Open Access Journals (Sweden)

    Alekseeva Ekaterina Leonidovna

    2012-10-01

    Full Text Available Upon examination of eleven main buildings of power plants, analysis of defects and damages of building structures was performed. Thereafter, the damageability of principal bearing structures of main buildings of thermal plants was analyzed. It was identified that the fastest growing defects and damages were concentrated in the structures of operating sites. The research of the rate of development of the most frequent damages and defects made it possible to conclude that internal corrosion of the reinforcing steel was the most dangerous defect, as far as the reinforced concrete elements of operating sites were concerned. Methods of mathematical statistics were applied to identify the reinforcing steel development pattern inside reinforced concrete elements of floors of operating sites. It was identified that the probability of corrosion of reinforced concrete elements of operating sites was distributed in accordance with the demonstrative law. Based on these data, calculation of strength of reinforced concrete slabs and metal beams was performed in terms of their regular sections, given the natural loads and the realistic condition of structures. As a result, dependence between the bearing capacity reserve ratio and the corrosion development pattern was identified for reinforced concrete slabs and metal beams of operating sites. In order to analyze the sufficiency of the bearing capacity of building structures of operating sites in relation to their time in commission, equations were derived to identify the nature of dependence between the sufficiency of the bearing capacity of reinforced concrete slabs and metal beams of the operating sites and their time in commission.

  11. Hard Hats, Octopuses and Rubber Boots- Operational Managers in Building Processes

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    This paper discusses Operation management (OM) in the production of buildings. It is initially contended that OM needs to be improved, from a theoretical and practical perspective. Departing from a criticism of present modeling and management of processes it is suggested to develop an understanding...... of the steps and interdependencies in the process. The field study shows a vast amount of interruptions in operational managers work at the building site. The site managers studied typically worked with four main activities and were interrupted some 126 times during a workday. The prime reason...

  12. Operational Planning of Low-Energy District Heating Systems Connected to Existing Buildings

    DEFF Research Database (Denmark)

    Tol, Hakan; Svendsen, Svend

    2012-01-01

    . The response of the radiator heating systems at different levels of supply temperature was used to form the operational planning of the low-energy DH system, which determined the design parameters of the low-energy DH network in terms of overall mass flow requirement and the return temperature from...... the buildings. Since the existing buildings were considered to be renovated to low-energy class, the operational planning was simultaneously modelled for both present high-demand and future low-demand situations of the same case area.......This article focuses on low-energy District Heating (DH) systems operating in low-temperatures such as 55°C in terms of supply and 25°C in terms of return in connection with existing buildings. Since the heat loss from the network has a significant impact in case of supplying heat to low...

  13. Temporal trends in erosion and hydrology for a post-mining landform at Ranger mine, Northern Territory. Supervising Scientist report 165

    International Nuclear Information System (INIS)

    Moliere, D.R.; Evans, K.G.; Saynor, M.J.; Willgoose, G.R.

    2002-01-01

    An important part of rehabilitation planning for mines is the design of a stable landform for waste rock dumps or spoil piles, at the completion of mining, which minimise erosion and environmental impact offsite. To successfully incorporate landform designs in planning, there is a need to be able to predict the surface stability of the final landform using erosion and landform evolution modelling techniques. In the long term, weathering, soil forming processes, ecosystem development and even climate change may affect the surface characteristics, and hence the stability, of the rehabilitated landform. In this study, changes to the surface characteristics of a landform in time can be quantified in terms of erosion parameters. Since a prediction of the stability of the rehabilitated landform is required over the long term, temporal changes in these erosion parameters are incorporated into landform evolution modelling of a post-mining landform. The landform evolution model SIBERIA was used to predict the stability of the proposed rehabilitated landform at Ranger Mine, Northern Territory. The data collection sites were considered to be representative of the hydrology and erosion characteristics that would exist on the WRD at Ranger at various stages after rehabilitation. This study uses measured site data from landforms with hydrology and erosion properties similar to those likely to develop on Ranger at various times after rehabilitation to assess the effect of temporal change on landform evolution model input parameters. Section 2 documents the process of SIBERIA input parameter derivation and landform evolution modelling using collected site rainfall, runoff and sediment loss data. This section is based on the detailed descriptions of the process given in Willgoose and Riley (1998) and Evans et al( 1998). In section 3, monitoring data, collected from sites with properties similar to those likely to develop on the proposed above-grade landform at Ranger at various

  14. Performance evaluation of operational energy use in refurbishment, reuse, and conservation of heritage buildings for optimum sustainability

    Directory of Open Access Journals (Sweden)

    O.K. Akande

    2016-09-01

    Full Text Available The operational phase of a building project has increasingly gained importance with their energy performance becoming valuable and determining their operational excellence. In most heritage building projects (HBPs, the operational energy use aspects are less considered, and a systematic way of analyzing their energy performance following project delivery is often lacking. The aim of this study is to evaluate the operational performance of refurbishment and reuse of UK listed church projects. The objective is to assess the operational energy use with a view to optimizing their sustainable performance. The methodology includes eight selected case study buildings refurbished and converted for multipurpose use. The case study approach provided qualitative insights into how the study contributes to a more structured requirements for energy management in HBPs with specific attention to energy-efficient building operations. The findings show the need to focus on fundamental areas of operational management (i.e. by developing and implementing more focused policy on operational energy performance of heritage buildings to minimize the energy required to operate them. The challenges of implementing changes in operational energy performance improvement of heritage buildings are addressed in the form of recommendations that could lead to real results. The study concludes that leveraging these areas requires commitment from all heritage building stakeholders because they all have substantial roles in harmonizing the requirement for the project׳s sustainability and not just the building operators. Meanwhile, baseline project planning, periodic updating, monitoring, and managing the energy use pattern are suggested as measures that could greatly facilitate better energy performance to optimizing their sustainable reuse compared with the traditional approach of trying to improve their thermal performance.

  15. Transportable Payload Operations Control Center reusable software: Building blocks for quality ground data systems

    Science.gov (United States)

    Mahmot, Ron; Koslosky, John T.; Beach, Edward; Schwarz, Barbara

    1994-01-01

    The Mission Operations Division (MOD) at Goddard Space Flight Center builds Mission Operations Centers which are used by Flight Operations Teams to monitor and control satellites. Reducing system life cycle costs through software reuse has always been a priority of the MOD. The MOD's Transportable Payload Operations Control Center development team established an extensive library of 14 subsystems with over 100,000 delivered source instructions of reusable, generic software components. Nine TPOCC-based control centers to date support 11 satellites and achieved an average software reuse level of more than 75 percent. This paper shares experiences of how the TPOCC building blocks were developed and how building block developer's, mission development teams, and users are all part of the process.

  16. Optimum operation of heating systems in office buildings. Automated error detection and analysis improves running building operation; Heizsysteme in Buerogebaeuden optimal betreiben. Automatisierte Fehlererkennung und -analyse verbessert den laufenden Gebaeudebetrieb

    Energy Technology Data Exchange (ETDEWEB)

    Friedrich, Uwe

    2013-06-01

    Since 2010, various institutes, universities and consultancy companies have been conducting research on automated operation optimisation in larger buildings. For this purpose, they have developed procedures for commissioning and monitoring building services equipment systems, firstly for large heat supply units. These are currently being used and evaluated on an ongoing basis in seven office and school buildings. The aim is to make significant energy and cost savings, and to improve the level of convenience in the building.

  17. Experience with the use of building commissioning advisor - from design to operation

    DEFF Research Database (Denmark)

    Forman, Marianne

    2016-01-01

    The increased focus on building energy performance has intensified the need to ensure consistency between energy requirements, design, construction processes and operation in construction projects. With the introduction of the new Danish DS 3090 standard, "The commissioning process in buildings...... on ethnographic methods and theories, this paper will analyse and discuss what the use of a commissioning adviser in the design stage means for the interaction between design and operation. It may seem that "technical solutions" are made before “ongoing learning processes” in which new themes are articulated...

  18. Building a Uranium Heap Leach Project

    International Nuclear Information System (INIS)

    Schnell, Henry

    2014-01-01

    Despite all these we have seen many HL successes and many interesting projects coming down the pipe. • Previous experience in Uranium with previous ROM projects in France (Bessines, Langone), Niger (Somair), Canada (Agnew Lake) and other locations had provided some basic background. • Heap leach based on copper experience with crushed ore has operated for many years in Brazil (Caetite). • Many gold operations for many decades in all climates and continents. • Copper at +20% of production, many in Chile, but also now in many other countries. • Uranium with agglomerated crushed ores is now becoming more prominent – Somair, Imouraren, Trekkopje. • Work also ongoing for Ranger, Rossing, and in consideration for other projects. • Other notable work in Nickel, and multi-metal such as Talvivaara

  19. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-03-31

    Universidad del Turabo (UT), in a collaborative effort with Global Turn Key Services, Inc. (GTKS), proposed to develop a training program and a commercialization plan for the development of Commercial Building Operators (CBOs). The CBOs will operate energy efficient buildings to help maintain existing buildings up to their optimal energy performance level, and ensure that net-zero-energy buildings continuously operate at design specifications, thus helping achieve progress towards meeting BTP Strategic Goals of creating technologies and design approaches that enable net-zero-energy buildings at low incremental costs by 2025. The proposed objectives were then: (1) Develop a Commercial Building Operator (CBO) training program and accreditation that will in turn provide a certification to participants recognized by Accreditation Boards such as the North American Board of Certified Energy Practitioners (NABCEP) and Leadership in Energy & Environmental Designs (LEED). (2) Develop and implement a commercialization and sustainability plan that details marketing, deployment, financial characterization, job placement, and other goals required for long-term sustainability of the project after the funding period. (3) After program development and deployment, provide potential candidates with the knowledge and skill sets to obtain employment in the commercial building green energy (net-zero-energy building) job market. The developed CBO training program will focus on providing skills for participants, such as displaced and unemployed workers, to enter the commercial building green energy (net-zeroenergy building) job market. This course was designed to allow a participant with minimal to no experience in commercial building green technology to obtain the required skill sets to enter the job market in as little as 12 weeks of intensive multi-faceted learning. After completion of the course, the CBO staff concluded the participant will meet minimum established accreditation

  20. CRITICAL FACTORS THAT LEAD TO GREEN BUILDING OPERATIONS AND MAINTENANCE PROBLEMS IN MALAYSIA

    OpenAIRE

    Izran Sarrazin MOHAMMAD; Nurul Nadiah ZAINOL; Shardy ABDULLAH; Neo Bee WOON; Nur Aqlima RAMLI

    2014-01-01

    The development of green buildings has become a trend in recent years in the effort to enhance the well-being of the community, environmental health, and life-cycle cost. However, many have argued that the complexities rendered by green buildings during the operational and maintenance phase often overshadow the benefits that can be gained through the development of green buildings. Several factors that lead to complexities in managing and maintaining green buildings have been highlighted by s...

  1. Sensitivity analysis for daily building operation from the energy and thermal comfort standpoint

    Directory of Open Access Journals (Sweden)

    Ignjatović Marko G.

    2016-01-01

    Full Text Available Improving energy performance of buildings is one of the most important tasks for reaching sustainability. Assessing building energy consumption is performed more often with specialized simulation tools. Sensitivity analysis proved to be a valuable tool for creating more reliable and realistic building energy models and better buildings. This paper briefly describes the methodology for running global sensitivity analysis and tools that can be used, and presents the results of such an analysis conducted for winter period, daily, on input variables covering a real building's operation, control and occupant related parameters that affect both thermal comfort and heating energy consumption. Two sets of inputs were created. The only difference between these sets is an addition of clothing insulation and occupant heat gain as input variables. The reference building was simulated for three distinctive winter weeks. Two additional input variables have an effect especially on thermal comfort, but they do not disturb the relative order of other influential input variables. The common influential variables for both energy consumption and thermal comfort were identified and are: air handling unit sup-ply temperature and airflow rate and control system related parameters. This can help in future research into implementing the simulation-assisted optimized operation in real buildings. [Projekat Ministarstva nauke Republike Srbije, br. TR-33051: The concept of sustainable energy supply of settlements with energy efficient buildings

  2. Building performance simulation for sustainable building design and operation

    NARCIS (Netherlands)

    Hensen, J.L.M.

    2011-01-01

    This paper aims to provide a general view of the background and current state of building performance simulation, which has the potential to deliver, directly or indirectly, substantial benefits to building stakeholders and to the environment. However the building simulation community faces many

  3. Customer Attraction in a Design-Build-Finance-Maintain-Operate Contract

    NARCIS (Netherlands)

    Favie, R.; Nordennen, van A.; Kleine, A.J.; Maas, G.J.; Ceric, A.; Radujkovic, M.

    2009-01-01

    In the Netherlands, large public customers use integrated contracts more and more often for complicated civil engineering and architectural works. Projects with integrated contracts such as Design, Build, Finance, Maintenance and Operate require tenderers to behave differently than they are

  4. Build-operate-transfer Outsourcing Contracts in Services

    DEFF Research Database (Denmark)

    Ørberg Jensen, Peter D.; Petersen, Bent

    2013-01-01

    Build-operate-transfer (BOT) contracting has been widely used in the engineering and construction industry and has recently spread into the service industry domains. Notably, service provider firms from emerging markets, India in particular, are now offering BOT outsourcing contracts in which...... the client firms are allotted call options, i.e. the right, but not the obligation, to transfer pre-specified assets from the service provider. As such, BOT outsourcing contracts seems to be an interesting contractual novelty that combines the advantages of outsourced and captive offshoring operations....... In this paper we investigate under which circumstances a BOT outsourcing contract (i.e. a contract where the client firm exercises its call option) is beneficial, or the opposite, to the emerging market vendor firm. Whether BOT outsourcing contracts are boon or bane to an emerging market vendor basically hinges...

  5. Development and Evaluation of Algorithms to Improve Small- and Medium-Size Commercial Building Operations

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woohyun [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Katipamula, Srinivas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lutes, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Underhill, Ronald M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-10-31

    Small- and medium-sized (<100,000 sf) commercial buildings (SMBs) represent over 95% of the U.S. commercial building stock and consume over 60% of total site energy consumption. Many of these buildings use rudimentary controls that are mostly manual, with limited scheduling capability, no monitoring or failure management. Therefore, many of these buildings are operated inefficiently and consume excess energy. SMBs typically utilize packaged rooftop units (RTUs) that are controlled by an individual thermostat. There is increased urgency to improve the operating efficiency of existing commercial building stock in the U.S. for many reasons, chief among them is to mitigate the climate change impacts. Studies have shown that managing set points and schedules of the RTUs will result in up to 20% energy and cost savings. Another problem associated with RTUs is short-cycling, where an RTU goes through ON and OFF cycles too frequently. Excessive cycling can lead to excessive wear and lead to premature failure of the compressor or its components. The short cycling can result in a significantly decreased average efficiency (up to 10%), even if there are no physical failures in the equipment. Also, SMBs use a time-of-day scheduling is to start the RTUs before the building will be occupied and shut it off when unoccupied. Ensuring correct use of the zone set points and eliminating frequent cycling of RTUs thereby leading to persistent building operations can significantly increase the operational efficiency of the SMBs. A growing trend is to use low-cost control infrastructure that can enable scalable and cost-effective intelligent building operations. The work reported in this report describes three algorithms for detecting the zone set point temperature, RTU cycling rate and occupancy schedule detection that can be deployed on the low-cost infrastructure. These algorithms only require the zone temperature data for detection. The algorithms have been tested and validated using

  6. China Building Energy Consumption: Definitions and Measures from an Operational Perspective

    Directory of Open Access Journals (Sweden)

    Wei Wei

    2017-04-01

    Full Text Available China building energy consumption (BEC has been gradually derived and also sparked attention. However, something worth discussing is estimating the BEC based on the definition of life cycle or building operation. In addition, there exists discrepancy in the previous studies and the real status of BEC has not been known well. In order to settle the disputes over the calculation of BEC, this paper establishes an appropriate accounting method of building energy to present the BEC situation in China and lays the foundation for policymakers to develop appropriate energy saving policies. Meanwhile, this study attempts to clarify the BEC to help policymakers assess the effect of environmental policies. Using the method in this document, we find that the energy consumption of buildings just accounts for 15%–16% of the final total energy consumption in China; by contrast, the previous studies usually have double accounting through a top-down approach if central heat supply of buildings was taken into additional consideration.

  7. Five Principles of Industrialized Transformation for Successfully Building an Operational Backbone

    DEFF Research Database (Denmark)

    Winkler, Till J.; Kettunen, Petteri

    2018-01-01

    approach that is underpinned by five principles—template-based, business-driven, matrix-organized, tight supplier steering and cascaded planning. The UPM case provides important lessons for transformation leaders seeking to build, expand or develop a value-adding operational backbone.......To move into the digital age, a globally operating company needs to have in place an operational backbone, but many struggle with achieving this and the associated transformation program. Based on the experience of UPM, a Finnish forest industry company, we describe an industrialized transformation...

  8. Forecasting ofuseful life of the structures of a production building during operation

    Directory of Open Access Journals (Sweden)

    Pshenichkina Valeriya

    2017-01-01

    Full Text Available The article presents a probabilistic concept of practical evaluation of the individual resource of structures of industrial buildings and structures in operation. The results of calculation of a monolithic reinforced concrete overpass for safety and durability are given. The quantitative values of the resource are obtained for a given security of operability.

  9. Supporting human performance in operations - principles for new nuclear build

    International Nuclear Information System (INIS)

    Lane, L.; Davey, E.

    2006-01-01

    Operational experience worldwide continues to demonstrate that human performance is a key factor in the ongoing safety, production, and protection of investment in operation of nuclear plants for electricity generation. Human performance in support of plant operational objectives can be influenced by a range of factors, for example: organizational culture and expectations; role assignments, training, and individual and team behaviours; and the support offered by the workplace environment, tools, and task design. This paper outlines a perspective on some of the principles that should be considered for application in the design of new nuclear build to facilitate support for human performance in plant operations. The principles identified focus on but are not limited to the tasks of shift staff, and are derived from the observations and experience of the authors who are experienced with control room operations in current plants. (author)

  10. Supporting human performance in operations - principles for new nuclear build

    Energy Technology Data Exchange (ETDEWEB)

    Lane, L. [Ontario Power Generation, Darlington Nuclear Div., Bowmanville, Ontario (Canada); Davey, E. [Crew Systems Solutions, Deep River, Ontario (Canada)

    2006-07-01

    Operational experience worldwide continues to demonstrate that human performance is a key factor in the ongoing safety, production, and protection of investment in operation of nuclear plants for electricity generation. Human performance in support of plant operational objectives can be influenced by a range of factors, for example: organizational culture and expectations; role assignments, training, and individual and team behaviours; and the support offered by the workplace environment, tools, and task design. This paper outlines a perspective on some of the principles that should be considered for application in the design of new nuclear build to facilitate support for human performance in plant operations. The principles identified focus on but are not limited to the tasks of shift staff, and are derived from the observations and experience of the authors who are experienced with control room operations in current plants. (author)

  11. Groundwater regimes and isotopic studies, Ranger mine area, Northern Territory

    Energy Technology Data Exchange (ETDEWEB)

    Ahmad, M; Green, D C

    1986-12-01

    Three types of groundwater occur in the area of the Ranger mine. Type A groundwater occurs in the loose sands and gravels occupying the present day stream channels, Type B in the weathering profile and Type C occurs in relatively fresh fractured bedrock occupying open fractures and other cavities. The three types of groundwater can be distinguished both chemically and isotopically. Light stable isotope data suggest that most early rains are lost by evapotranspiration and have no imprint on the groundwater. Later in the wet season, the ground is saturated and groundwater recharge occurs on a regional scale. This younger groundwater sits on the older waters. Mixing is probably minimal as before any large scale mixing could occur, most younger waters are lost by evapotranspiration. Stable isotope data suggest that Type B groundwater in certain areas has some connection with evaporated surface water bodies. Stable isotope measurements for the pollution monitoring bores around the tailings dam do not indicate any connection with the polluted pond waters at the time of sample collection.

  12. Efficient energy consumption and operation management in a smart building with microgrid

    International Nuclear Information System (INIS)

    Zhang, Di; Shah, Nilay; Papageorgiou, Lazaros G.

    2013-01-01

    Highlights: • An MILP model is formulated for energy consumption scheduling in a smart building. • Domestic appliances from multiple smart homes are considered. • Equipment operation and power consumption tasks starting time are scheduled. • Results from two examples indicate cost savings and power peak reduction. • Peak demand charge scheme is adopted to reduce the peak demand from grid. - Abstract: Microgrid works as a local energy provider for domestic buildings to reduce energy expenses and gas emissions by utilising distributed energy resources (DERs). The rapid advances in computing and communication capabilities enable the concept smart buildings become possible. Most energy-consuming household tasks do not need to be performed at specific times but rather within a preferred time. If these types of tasks can be coordinated among multiple homes so that they do not all occur at the same time yet still satisfy customers’ requirement, the energy cost and power peak demand could be reduced. In this paper, the optimal scheduling of smart homes’ energy consumption is studied using a mixed integer linear programming (MILP) approach. In order to minimise a 1-day forecasted energy consumption cost, DER operation and electricity-consumption household tasks are scheduled based on real-time electricity pricing, electricity task time window and forecasted renewable energy output. Peak demand charge scheme is also adopted to reduce the peak demand from grid. Two numerical examples on smart buildings of 30 homes and 90 homes with their own microgrid indicate the possibility of cost savings and electricity consumption scheduling peak reduction through the energy consumption and better management of DER operation

  13. Building Co-Management as a Process: Problem Solving Through Partnerships in Aboriginal Country, Australia

    Science.gov (United States)

    Zurba, Melanie; Ross, Helen; Izurieta, Arturo; Rist, Philip; Bock, Ellie; Berkes, Fikret

    2012-06-01

    Collaborative problem solving has increasingly become important in the face of the complexities in the management of resources, including protected areas. The strategy undertaken by Girringun Aboriginal Corporation in north tropical Queensland, Australia, for developing co-management demonstrates the potential for a problem solving approach involving sequential initiatives, as an alternative to the more familiar negotiated agreements for co-management. Our longitudinal case study focuses on the development of indigenous ranger units as a strategic mechanism for the involvement of traditional owners in managing their country in collaboration with government and other interested parties. This was followed by Australia's first traditional use of marine resources agreement, and development of a multi-jurisdictional, land to sea, indigenous protected area. In using a relationship building approach to develop regional scale co-management, Girringun has been strengthening its capabilities as collaborator and regional service provider, thus, bringing customary decision-making structures into play to `care for country'. From this evolving process we have identified the key components of a relationship building strategy, `the pillars of co-management'. This approach includes learning-by-doing, the building of respect and rapport, sorting out responsibilities, practical engagement, and capacity-building.

  14. Assessment of the meteorological data and atmospheric dispersion estimates in the Ranger 1 Uranium Mining Environmental Impact Statement

    International Nuclear Information System (INIS)

    Clark, G.H.

    1977-03-01

    Wind records from Jabiru, Northern Territory, Australia have been re-analysed to give atmospheric dispersion estimates of sulphur dioxide and radioactive contaminants associated with a proposed uranium mining and milling operation. Revisions in the plume rise equations have led to lower annual average sulphur dioxide air concentrations than those presented in the Ranger 1 Uranium Mining Environmental Impact Statement. Likewise, the short term peak air concentrations of sulphur dioxide were all within the United States Environment Protection Agency air quality standards. Even though the radon gas inventory was revised upwards, predicted concentrations were only slightly higher than those in the RUMEIS. An attempt was made at a first estimate of the uranium dust source term caused by wind suspension from stockpiled ore and waste rock. In a preliminary analysis using a 'surface depletion' model, it was estimated that uranium dust air concentrations would be decreased by about an order of magnitude when dry deposition was included in the atmospheric dispersion model. Integrating over all sources, radionuclides and meteorological conditions, the annual radiation dose to members of the public in the Regional Centre is estimated to be a maximum of 5 per cent of the recommended annual limits. (author)

  15. Complex analysis of energy efficiency in operated high-rise residential building: Case study

    Science.gov (United States)

    Korniyenko, Sergey

    2018-03-01

    Energy conservation and human thermal comfort enhancement in buildings is a topical issue of modern architecture and construction. The innovative solution of this problem makes it possible to enhance building ecological and maintenance safety, to reduce hydrocarbon fuel consumption, and to improve life standard of people. The requirements to increase of energy efficiency in buildings should be provided at all the stages of building's life cycle that is at the stage of design, construction and maintenance of buildings. The research purpose is complex analysis of energy efficiency in operated high-rise residential building. Many actions for building energy efficiency are realized according to the project; mainly it is the effective building envelope and engineering systems. Based on results of measurements the energy indicators of the building during annual period have been calculated. The main reason of increase in heat losses consists in the raised infiltration of external air in the building through a building envelope owing to the increased air permeability of windows and balcony doors (construction defects). Thermorenovation of the building based on ventilating and infiltration heat losses reduction through a building envelope allows reducing annual energy consumption. Energy efficiency assessment based on the total annual energy consumption of building, including energy indices for heating and a ventilation, hot water supply and electricity supply, in comparison with heating is more complete. The account of various components in building energy balance completely corresponds to modern direction of researches on energy conservation and thermal comfort enhancement in buildings.

  16. Architecture for self-organizing, co-operative and robust building automation systems

    NARCIS (Netherlands)

    Bernier, F.; Ploennigs, J.; Pesch, D.; Lesecq, S.; Basten, T.; Boubekeur, M.; Denteneer, T.J.J.; Oltmanns, F.; Lehmann, M.; Mai, Linh Tuan; Mc Gibney, A.; Rea, S.; Pacull, F.; Guyon-Gardeux, C.; Ducreux, L.F.; Thior, S.; Hendriks, M.; Verriet, J.H.; Fedor, S.

    2013-01-01

    This paper provides an overview of the architecture for self-organizing, co-operative and robust Building Automation Systems (BAS) proposed by the EC funded FP7 SCUBA1 project. We describe the current situation in monitoring and control systems and outline the typical stakeholders involved in the

  17. Architecture for self-organizing, co-operative and robust Building Automation Systems

    NARCIS (Netherlands)

    Bernier, F.; Ploennigs, J.; Pesch, D.; Lesecq, S.; Basten, T.; Boubekeur, M.; Denteneer, D.; Oltmanns, F.; Bonnard, F.; Lehmann, M.; Mai, T.L.; McGibney, A.; Rea, S.; Pacull, F.; Guyon-Gardeux, C.; Ducreux, L.F.; Thior, S.; Hendriks, M.; Verriet, J.; Fedor, S.

    2013-01-01

    This paper provides an overview of the architecture for self-organizing, co-operative and robust Building Automation Systems (BAS) proposed by the EC funded FP7 SCUBA1 project. We describe the current situation in monitoring and control systems and outline the typical stakeholders involved in the

  18. Complex analysis of energy efficiency in operated high-rise residential building: Case study

    Directory of Open Access Journals (Sweden)

    Korniyenko Sergey

    2018-01-01

    Full Text Available Energy conservation and human thermal comfort enhancement in buildings is a topical issue of modern architecture and construction. The innovative solution of this problem makes it possible to enhance building ecological and maintenance safety, to reduce hydrocarbon fuel consumption, and to improve life standard of people. The requirements to increase of energy efficiency in buildings should be provided at all the stages of building's life cycle that is at the stage of design, construction and maintenance of buildings. The research purpose is complex analysis of energy efficiency in operated high-rise residential building. Many actions for building energy efficiency are realized according to the project; mainly it is the effective building envelope and engineering systems. Based on results of measurements the energy indicators of the building during annual period have been calculated. The main reason of increase in heat losses consists in the raised infiltration of external air in the building through a building envelope owing to the increased air permeability of windows and balcony doors (construction defects. Thermorenovation of the building based on ventilating and infiltration heat losses reduction through a building envelope allows reducing annual energy consumption. Energy efficiency assessment based on the total annual energy consumption of building, including energy indices for heating and a ventilation, hot water supply and electricity supply, in comparison with heating is more complete. The account of various components in building energy balance completely corresponds to modern direction of researches on energy conservation and thermal comfort enhancement in buildings.

  19. Analytically calculated post-Keplerian range and range-rate perturbations: the solar Lense-Thirring effect and BepiColombo

    Science.gov (United States)

    Iorio, Lorenzo

    2018-05-01

    We analytically calculate the time series for the perturbations Δ ρ \\left(t\\right), Δ \\dot{ρ }\\left(t\\right) induced by a general disturbing acceleration A on the mutual range ρ and range-rate \\dot{ρ } of two test particles A, B orbiting the same spinning body. We apply it to the general relativistic Lense-Thirring effect, due to the primary's spin S, and the classical perturbation arising from its quadrupole mass moment J2 for arbitrary orbital geometries and orientation of the source's symmetry axis {\\hat{S}}. The Earth-Mercury range and range-rate are nominally affected by the Sun's gravitomagnetic field to the 10 m, 10-3 cm s-1 level, respectively, during the extended phase (2026-2028) of the forthcoming BepiColombo mission to Mercury whose expected tracking accuracy is of the order of ≃0.1 m, 2 × 10-4 cm s-1. The competing signatures due to the solar quadrupole J_2^{\\odot }, if modelled at the σ _{J_2^{\\odot }}˜eq 10^{-9} level of the latest planetary ephemerides INPOP17a, are nearly 10 times smaller than the relativistic gravitomagnetic effects. The position and velocity vectors \\boldsymbol {r}, \\boldsymbol {v} of Mercury and Earth are changed by the solar Lense-Thirring effect by about 10 m, 1.5 m and 10-3 cm s-1, 10-5 cm s-1, respectively, over 2 yr; neglecting such shifts may have an impact on long-term integrations of the inner Solar system dynamics over ˜Gyr time-scales.

  20. Universal Library for Building Radar Operator Interface

    Directory of Open Access Journals (Sweden)

    A. A. Karankevich

    2014-01-01

    Full Text Available The article contains the results of the development of a software library, used for building software interfaces for radars being developed in BMSTU Radioelectronic Technics Scientific and Research Institute. The library is a software application library written in C++ using Qt and OpenGL libraries.The article describes the requirements, that the library is supposed to meet, in particular — cross-platform capabilities and versatility of the solution. The data types, that library uses, are described. The description of theinterface elements developed is shown, and some pictures of their operation are given.The article shows the main interface elements used. They are: «Matrix» that shows twodimensional data, «Waterfall», that is used for time scanning of the parameter specified, and «Plan Position Indicator» that shows circular scan from surveillance radar without geometric distortions.The part «Library implementation» shows the example of radiolocation station interface, that was based on this library, used in the working model of ultrashortpulse radar. Some results of the operation of this interface are also shown. The experiment shows the system working with two people in the field. As people start to move, the system becomes capable of distinguishing moving targets and stationary surface. The article shows the system operation the same way as the system operator can see it through his interface.The conclusion contains brief results of the development, the sphere of application of the software, and the prospects of the further development of the library.

  1. An analysis of the preliminary water management proposal for the Ranger Uranium Mine

    International Nuclear Information System (INIS)

    Gibson, D.K.

    1980-07-01

    Some of the problems expected to arise as a result of contamination of rainfall run-off by the ore and waste rock heaps of the Ranger Uranium Mine, at Jabiru in the Northern Territory of Australia, have been re-examined. A computer program has been written to estimate the quantity of run-off water resulting from any given rainfall pattern. The program was calibrated against measured stream flows in Gulungul Creek; it was then applied to the two major catchment areas surrounding the mine site, and estimates of the quantity and quality of discharge water were made. The effects of the discharge are discussed in relation to the levels tolerable to fish and, in the case of radium, permitted as uptake by humans. A possible modification to the water management plan, which would increase the time for sedimentation before discharge, is suggested

  2. Eliminate the Army and Air Force Reserves: Building a Robust National Guard to Meet 21st Century Operational Challenges

    Science.gov (United States)

    2016-04-04

    TITLE AND SUBTITLE ELIMINATE THE ARMY AND AIR FORCE RESERVES: BUILDING A ROBUST NATIONAL GUARD TO MEET 21ST CENTURY OPERATIONAL CHALLENGES 5a...STAFF COLLEGE JOINT ADVANCED WARFIGHTING SCHOOL ELIMINATE THE ARMY AND AIR FORCE RESERVES: BUILDING A ROBUST NATIONAL GUARD TO... ELIMINATE THE ARMY AND AIR FORCE RESERVES: BUILDING A ROBUST NATIONAL GUARD TO MEET 21ST CENTURY OPERATIONAL CHALLENGES by

  3. Development of a new energy benchmark for improving the operational rating system of office buildings using various data-mining techniques

    International Nuclear Information System (INIS)

    Park, Hyo Seon; Lee, Minhyun; Kang, Hyuna; Hong, Taehoon; Jeong, Jaewook

    2016-01-01

    Highlights: • This study developed a new energy benchmark for office buildings. • Correlation analysis, decision tree, and analysis of variance were used. • The data from 1072 office buildings in South Korea were used. • As a result, six types of energy benchmarks for office buildings were developed. • The operational rating system can be improved by using the new energy benchmark. - Abstract: As improving energy efficiency in buildings has become a global issue today, many countries have adopted the operational rating system to evaluate the energy performance of a building based on the actual energy consumption. A rational and reasonable energy benchmark can be used in the operational rating system to evaluate the energy performance of a building accurately and effectively. This study aims to develop a new energy benchmark for improving the operational rating system of office buildings. Toward this end, this study used various data-mining techniques such as correlation analysis, decision tree (DT) analysis, and analysis of variance (ANOVA). Based on data from 1072 office buildings in South Korea, this study was conducted in three steps: (i) Step 1: establishment of the database; (ii) Step 2: development of the new energy benchmark; and (iii) Step 3: application of the new energy benchmark for improving the operational rating system. As a result, six types of energy benchmarks for office buildings were developed using DT analysis based on the gross floor area (GFA) and the building use ratio (BUR) of offices, and these new energy benchmarks were validated using ANOVA. To ensure the effectiveness of the new energy benchmark, it was applied to three operational rating systems for comparison: (i) the baseline system (the same energy benchmark is used for all office buildings); (ii) the conventional system (different energy benchmarks are used depending on the GFA, currently used in South Korea); and (iii) the proposed system (different energy benchmarks are

  4. Economical analyses of build-operate-transfer model in establishing alternative power plants

    Energy Technology Data Exchange (ETDEWEB)

    Yumurtaci, Zehra [Yildiz Technical University, Department of Mechanical Engineering, Y.T.U. Mak. Fak. Mak. Muh. Bolumu, Besiktas, 34349 Istanbul (Turkey)]. E-mail: zyumur@yildiz.edu.tr; Erdem, Hasan Hueseyin [Yildiz Technical University, Department of Mechanical Engineering, Y.T.U. Mak. Fak. Mak. Muh. Bolumu, Besiktas, 34349 Istanbul (Turkey)

    2007-01-15

    The most widely employed method to meet the increasing electricity demand is building new power plants. The most important issue in building new power plants is to find financial funds. Various models are employed, especially in developing countries, in order to overcome this problem and to find a financial source. One of these models is the build-operate-transfer (BOT) model. In this model, the investor raises all the funds for mandatory expenses and provides financing, builds the plant and, after a certain plant operation period, transfers the plant to the national power organization. In this model, the object is to decrease the burden of power plants on the state budget. The most important issue in the BOT model is the dependence of the unit electricity cost on the transfer period. In this study, the model giving the unit electricity cost depending on the transfer of the plants established according to the BOT model, has been discussed. Unit electricity investment cost and unit electricity cost in relation to transfer period for plant types have been determined. Furthermore, unit electricity cost change depending on load factor, which is one of the parameters affecting annual electricity production, has been determined, and the results have been analyzed. This method can be employed for comparing the production costs of different plants that are planned to be established according to the BOT model, or it can be employed to determine the appropriateness of the BOT model.

  5. Economical analyses of build-operate-transfer model in establishing alternative power plants

    International Nuclear Information System (INIS)

    Yumurtaci, Zehra; Erdem, Hasan Hueseyin

    2007-01-01

    The most widely employed method to meet the increasing electricity demand is building new power plants. The most important issue in building new power plants is to find financial funds. Various models are employed, especially in developing countries, in order to overcome this problem and to find a financial source. One of these models is the build-operate-transfer (BOT) model. In this model, the investor raises all the funds for mandatory expenses and provides financing, builds the plant and, after a certain plant operation period, transfers the plant to the national power organization. In this model, the object is to decrease the burden of power plants on the state budget. The most important issue in the BOT model is the dependence of the unit electricity cost on the transfer period. In this study, the model giving the unit electricity cost depending on the transfer of the plants established according to the BOT model, has been discussed. Unit electricity investment cost and unit electricity cost in relation to transfer period for plant types have been determined. Furthermore, unit electricity cost change depending on load factor, which is one of the parameters affecting annual electricity production, has been determined, and the results have been analyzed. This method can be employed for comparing the production costs of different plants that are planned to be established according to the BOT model, or it can be employed to determine the appropriateness of the BOT model

  6. The use of social media for improving sustainable energy and building operation

    DEFF Research Database (Denmark)

    Knudsen, Helene Hjort

    2015-01-01

    This paper will draw perspectives of the experiences from the housing estate “Eight House”, using the social intranet media “Borigo”. How can Social Intranet Media support sustainable building operation with an overall aim of improving the residents’ sustainable practice? Can local operational...... managers of the residential area function as change agents in the process? What kind of process is needed? Can the use of social media support communities of practice?...

  7. Supplement to safety analysis report. 306-W building operations safety requirement

    International Nuclear Information System (INIS)

    Richey, C.R.

    1979-08-01

    The operations safety requirements (OSRs) presented in this report define the conditions, safe boundaries, and management control needed for safely conducting operations with radioactive materials in the Pacific Northwest Laboratory (PNL) 306-W building. The safety requirements are organized in five sections. Safety limits are safety-related process variables that are observable and measurable. Limiting conditions cover: equipment and technical conditions and characteristics of the facility and operations necessary for continued safe operation. Surveillance requirements prescribe the requirements for checking systems and components that are essential to safety. Equipment design controls require that changes to process equipment and systems be independently checked and approved to assure that the changes will have no adverse effect on safety. Administrative controls describe and discuss the organization and administrative systems and procedures to be used for safe operation of the facility. Details of the implementation of the operations safety requirements are prescribed by internal PNL documents such as criticality safety specifications and radiation work procedures

  8. By, with, and through: the theory and practice of special operations capacity-building

    OpenAIRE

    Heisler, Anthony F.

    2014-01-01

    Approved for public release; distribution is unlimited This thesis presents a theory of how U.S. special operations forces (USSOF) build partner capacity. Building partner capacity (BPC) is a cornerstone of America’s post-9/11 security strategy and a signature mission of USSOF. However, USSOF lacks a theory that articulates how capacity is built or the keys to its success. This thesis explores BPC from the top down, through national security documents, doctrine, and case studies. It identi...

  9. Managing urban wastewater in China: a survey of build-operate-transfer contracts

    NARCIS (Netherlands)

    Braadbaart, O.D.; Zhang, M.S.; Wang, Y.

    2009-01-01

    This paper reports on a nationwide field survey of wastewater plants under build-operate-transfer ( BOT) contracts in China. The survey yielded information on contracting parties, size, duration and location of 37 BOT contracts. The key findings are that municipal governments feature as first

  10. Energy Efficiency, Water Efficiency, and Renewable Energy Site Assessment: San Juan National Forest - Dolores Ranger District, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Kandt, Alicen J. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Kiatreungwattana, Kosol [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2018-01-26

    This report summarizes the results from an energy efficiency, water efficiency, and renewable energy site assessment of the Dolores Ranger District in the San Juan National Forest in Colorado. A team led by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) conducted the assessment with United States Forest Service (USFS) personnel on August 16-17, 2016, as part of ongoing efforts by USFS to reduce energy and water use and implement renewable energy technologies. The assessment is approximately an American Society of Heating, Refrigerating, and Air-Conditioning Engineers Level 2 audit and meets Energy Independence and Security Act requirements.

  11. Functional and operational requirements document : building 1012, Battery and Energy Storage Device Test Facility, Sandia National Laboratories, New Mexico.

    Energy Technology Data Exchange (ETDEWEB)

    Johns, William H. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2013-11-01

    This report provides an overview of information, prior studies, and analyses relevant to the development of functional and operational requirements for electrochemical testing of batteries and energy storage devices carried out by Sandia Organization 2546, Advanced Power Sources R&D. Electrochemical operations for this group are scheduled to transition from Sandia Building 894 to a new Building located in Sandia TA-II referred to as Building 1012. This report also provides background on select design considerations and identifies the Safety Goals, Stakeholder Objectives, and Design Objectives required by the Sandia Design Team to develop the Performance Criteria necessary to the design of Building 1012. This document recognizes the Architecture-Engineering (A-E) Team as the primary design entity. Where safety considerations are identified, suggestions are provided to provide context for the corresponding operational requirement(s).

  12. Building a pipeline of talent for operating radio observatories

    Science.gov (United States)

    Wingate, Lory M.

    2016-07-01

    The National Radio Astronomy Observatory's (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering in a focused, nine-week, continuous effort that includes a hands-on build project with the objective of constructing and verifying the performance of a student-level basic radio instrument. The combination of using a project management (PM)/systems engineering (SE) methodical approach based on internationally recognized standards in completing this build is to demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal results. It also exposes the learner to basic radio science theory. An additional simple research project is used to impress upon the learner both the methodical approach, and to provide a basic understanding of the functional area of interest to the learner. This program is designed to teach sustainable skills throughout the full spectrum of activities associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners thereby return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented1 groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.

  13. Novel Tools in Determining the Physiological Demands and Nutritional Practices of Ontario FireRangers during Fire Deployments.

    Directory of Open Access Journals (Sweden)

    A H Robertson

    Full Text Available The seasonal profession of wildland fire fighting in Canada requires individuals to work in harsh environmental conditions that are physically demanding. The purpose of this study was to use novel technologies to evaluate the physiological demands and nutritional practices of Canadian FireRangers during fire deployments.Participants (n = 21 from a northern Ontario Fire Base volunteered for this study and data collection occurred during the 2014 fire season and included Initial Attack (IA, Project Fire (P, and Fire Base (B deployments. Deployment-specific energy demands and physiological responses were measured using heart-rate variability (HRV monitoring devices (Zephyr BioHarness3 units. Food consumption behaviour and nutrient quantity and quality were captured using audio-video food logs on iPod Touches and analyzed by NutriBase Pro 11 software.Insufficient kilocalories were consumed relative to expenditure for all deployment types. Average daily kilocalories consumed: IA: 3758 (80% consumption rate; P: 2945±888.8; B: 2433±570.8. Average daily kilocalorie expenditure: IA: 4538±106.3; P: 4012±1164.8; B: 2842±649.9. The Average Macronutrient Distribution Range (AMDR for protein was acceptable: 22-25% (across deployment types. Whereas the AMDR for fat and carbohydrates were high: 40-50%; and low: 27-37% respectively, across deployment types.This study is the first to use the described methodology to simultaneously evaluate energy expenditures and nutritional practices in an occupational setting. The results support the use of HRV monitoring and video-food capture, in occupational field settings, to assess job demands. FireRangers expended the most energy during IA, and the least during B deployments. These results indicate the need to develop strategies centered on maintaining physical fitness and improving food practices.

  14. Energy consumption during the building life cycle – influence of investment activities and operations

    Directory of Open Access Journals (Sweden)

    Vytlačil Dalibor

    2018-01-01

    Full Text Available The paper describes the dynamic model of maintenance and investments of a building structure and HVAC systems. The aim of the research is finding the time dependent curve for energy consumption and also the cash flow that depends on the investments to energy saving arrangements and operations. The solution is based on the system dynamics method. The method makes possible to interconnect technical and economic parts of the problem. The main parameter in the model is the energy consumption in the building per floor square meter and year. This parameter is influenced by a deterioration of the building structure and the components of the active elements. The investments realized with the aim to decrease the energy consumption is another influence. The example of the computer simulation of the building parameters during the life cycle is presented in the paper.

  15. Building for a post-fossil era. Sustainable construction and operation of buildings; Bauen fuer die nachfossile Aera. Nachhaltiges Bauen und Betreiben von Gebaeuden

    Energy Technology Data Exchange (ETDEWEB)

    Daniels, Klaus [HL Beratungs- und Beteiligungs GmbH, Muenchen (Germany)

    2009-07-01

    The challenges of the 21st century will mostly be the result of the exploding world population, i.e. increasing instability because of the unequal distribution of wealth, fights over raw materials that are getting scarce, and the destruction of our natural resources. Increasingly, decision-makers are getting aware of the problems. This has consequences also for the process of building construction. For example, sustainability will be given greater attention in projecting and operation of buildings. (orig.)

  16. Smart grid and smart building inter-operation using agent-based particle swarm optimization

    NARCIS (Netherlands)

    Hurtado Munoz, L.A.; Nguyen, P.H.; Kling, W.L.

    2015-01-01

    Future power systems require a change from a "vertical" to a "horizontal" structure, in which the customer plays a central role. As buildings represent a substantial aggregation of energy consumption, the intertwined operation of the future power grid and the built environment is crucial to achieve

  17. Various methods of heat supply for a building which is operated periodically during the year

    Science.gov (United States)

    Małetka, Marek; Laska, Marta

    2017-11-01

    Stand-alone buildings operated periodically require heat supply for hot water and heating purposes to be carefully analyzed in terms of the technical capabilities, the energy and financial outlays. The paper presents the analysis of heat supply for hot water purposes and central heating in the stand-alone cloakroom building located in Poland. The analysis is undertaken for different variants of heat delivery for a building from electric heaters, gas boiler and district heating solutions to renewable sources applications, namely solar panels and heat pumps. For each solution, usage of usable, final and primary energy was calculated. Also the financial analysis for investments and energy costs were carried out. This analysis has been done in according to SPBT and NPV method for different levels of building use.

  18. Thermo-active building systems and sound absorbers: Thermal comfort under real operation conditions

    DEFF Research Database (Denmark)

    Köhler, Benjamin; Rage, Nils; Chigot, Pierre

    2018-01-01

    Radiant systems are established today and have a high ecological potential in buildings while ensuring thermal comfort. Free-hanging sound absorbers are commonly used for room acoustic control, but can reduce the heat exchange when suspended under an active slab. The aim of this study...... is to evaluate the impact on thermal comfort of horizontal and vertical free-hanging porous sound absorbers placed in rooms of a building cooled by Thermo-Active Building System (TABS), under real operation conditions. A design comparing five different ceiling coverage ratios and two room types has been...... implemented during three measurement periods. A clear correlation between increase of ceiling coverage ratio and reduction of thermal comfort could not be derived systematically for each measurement period and room type, contrarily to what was expected from literature. In the first two monitoring periods...

  19. Operation of heat pumps for smart grid integrated buildings with thermal energy storage

    NARCIS (Netherlands)

    Finck, C.J.; Li, R.; Zeiler, W.

    2017-01-01

    A small scale office building consisting of radiant heating, a heat pump, and a water thermal energy storage tank is implemented in an optimal control framework. The optimal control aims to minimize operational electricity costs of the heat pump based on real-time power spot market prices. Optimal

  20. The effects of HVAC system design and operation on radon entry into school buildings

    International Nuclear Information System (INIS)

    Turner, W.A.; Leovic, K.W.; Craig, A.B.

    1990-01-01

    Heating, ventilating, and air conditioning (HVAC) systems in schools vary considerably and tend to have a greater impact on pressure differentials--and consequently radon levels--than do heating and air-conditioning systems in houses. If the HVAC system induces a negative pressure relative to the subslab area, radon can be pulled into the building. If the HVAC system pressurizes the building, it can prevent radon entry as long as the fan is running. However, school HVAC systems are normally set back or turned off on evenings and weekends and, even if the HVAC system pressurizes the school during operation, indoor radon levels may build up during setback periods. In this paper many of the historical methods utilized to deliver ventilation air (outdoor air) over the past 40 years are summarized. In addition, for each type of system presented, the possible impact the ventilation system might be expected to have (positive or negative) on the pressure of the building envelope (and subsequent radon levels in the building) is discussed

  1. SOLAR SYSTEMS FOR RESIDENTIAL BUILDINGS IN ACCORDANCE WITH OPERATING CONDITIONS OF THE REPUBLIC OF BELARUS

    Directory of Open Access Journals (Sweden)

    M. A. Rutkowski

    2017-01-01

    Full Text Available Solar systems are actively applied for heat supply of buildings in Europe. Usage of solar energy for heat supply of residential buildings is considered as rather efficient for the Republic of Belarus because total amount of direct and scattered solar radiation entering horizontal surface is equivalent to an average European index for the climate of Belarus. The paper analyzes an existing dependence on determination of solar system efficiency and proposes an amended formula for calculations while designing solar consumption systems and its legitimacy has been experimentally proved. A scheme of an experimental unit with explanations and a brief description for execution of experiments and main results of the completed investigations have been presented in the paper. Experiments have been carried out for solar systems with natural and forced coolant circulation. Attention has been paid to obtaining maximum possible temperature potential of the coolant during operation of the solar system within periods of high and low solar radiation intensity. Recommendations on practical application of solar systems for multi-storey residential buildings houses and mansion-type houses have been given in the paper. The paper presents technological principles of constructing “passive” solar heating devices. A comparison of traditionally applied and proposed alternative solar systems has been made for operational conditions in Belarus. The paper proposes a solar system for hot water supply of multi-storey buildings. The proposed system has found its first realization in the Republic while designing and constructing an energy-efficient demonstration 10-storey residential building in Mogilev within the framework of the UN Development Program project and Global Environment Fund “Improvement of energy efficiency for residential buildings in the Republic of Belarus”

  2. How to use Building Information Systems for a transition towards Sustainable Building Operation

    NARCIS (Netherlands)

    Itard, L.C.M.; Joosstens, F; Heiselberg, Per Kvols

    2016-01-01

    BIM Building Information Model or Modelling connects many different information
    systems from various actors during the building construction process with each
    other in one easily accessible and understandable model. BIM assures an effective
    and efficient building construction process by

  3. Various methods of heat supply for a building which is operated periodically during the year

    Directory of Open Access Journals (Sweden)

    Małetka Marek

    2017-01-01

    Full Text Available Stand-alone buildings operated periodically require heat supply for hot water and heating purposes to be carefully analyzed in terms of the technical capabilities, the energy and financial outlays. The paper presents the analysis of heat supply for hot water purposes and central heating in the stand-alone cloakroom building located in Poland. The analysis is undertaken for different variants of heat delivery for a building from electric heaters, gas boiler and district heating solutions to renewable sources applications, namely solar panels and heat pumps. For each solution, usage of usable, final and primary energy was calculated. Also the financial analysis for investments and energy costs were carried out. This analysis has been done in according to SPBT and NPV method for different levels of building use.

  4. Premium cost optimization of operational and maintenance of green building in Indonesia using life cycle assessment method

    Science.gov (United States)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Budiman, Rachmat; Riswanto

    2017-06-01

    Building has a big impact on the environmental developments. There are three general motives in building, namely the economy, society, and environment. Total completed building construction in Indonesia increased by 116% during 2009 to 2011. It made the energy consumption increased by 11% within the last three years. In fact, 70% of energy consumption is used for electricity needs on commercial buildings which leads to an increase of greenhouse gas emissions by 25%. Green Building cycle costs is known as highly building upfront cost in Indonesia. The purpose of optimization in this research improves building performance with some of green concept alternatives. Research methodology is mixed method of qualitative and quantitative approaches through questionnaire surveys and case study. Assessing the successful of optimization functions in the existing green building is based on the operational and maintenance phase with the Life Cycle Assessment Method. Choosing optimization results were based on the largest efficiency of building life cycle and the most effective cost to refund.

  5. Institutional and scientific co-operation, networking and capacity building in the field of food safety and quality

    NARCIS (Netherlands)

    Boekel, van M.A.J.S.; Meerdink, G.; Banati, D.; Marvin, H.J.P.; Kuiper, H.A.; Houtman, C.B.

    2002-01-01

    This paper explains the situation in Hungary and The Netherlands regarding scientific co-operation, networking and capacity building in the field of food quality and safety. Specific details are given about institutional co-operation including exchanges between staff and students, collaborative

  6. Nuclear power costs in the build, operate, transfer approach

    International Nuclear Information System (INIS)

    Aybers, M.N.; Sahin, B.

    1990-01-01

    The costs of nuclear power are discussed with special reference to the economic problems faced by developing countries, and the relative merit of a new accounting approach, viz., the build, operate, transfer contract model, which was proposed in Turkey for the Akkuyu nuclear power project, is illustrated. In this context, the general methodology of calculating nuclear power costs is summarized and a capital cost analysis for a 986 MW pressurized water reactor plant is given in terms of constant monetary units for the above contract model and the turnkey contract model. Adjustment of the costs taking into account regional conditions such as inflation and higher interest rates is also indicated. (orig.) [de

  7. A Modified Model to Estimate Building Rental Multipiers Accounting for Advalorem Operating Expenses

    Directory of Open Access Journals (Sweden)

    Smolyak S.A.

    2016-09-01

    Full Text Available To develop ideas on building element valuation contained in the first article on the subject published in REMV, we propose an elaboration of the approach accounting for ad valorem expenses incidental to property management, such as land taxes, income/capital gains tax, and insurance premium costs; all such costs, being of an ad valorem nature in the first instance, cause circularity in the logic of the model, which, however, is not intractable under the proposed approach. The resulting formulas for carrying out practical estimation of building rental multipliers and, in consequence, of building values, turn out to be somewhat modified, and we demonstrate the sensitivity of the developed approach to the impact of these ad valorem factors. On the other hand, it is demonstrated that (accounting for building depreciation charges, which should seemingly be included among the considered ad valorem factors, cancel out and do not have any impact on the resulting estimates. However, treating the depreciation of buildings in quantifiable economic terms as a reduction in derivable operating benefits over time (instead of mere physical indications, such as age, we also demonstrate that the approach has implications for estimating the economic service lives of buildings and can be practical when used in conjunction with the market-related approach to valuation – from which the requisite model inputs can be extracted as shown in the final part of the paper.

  8. The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

    Science.gov (United States)

    Fatig, Curtis; Ochs, William; Johns, Alan; Seaton, Bonita; Adams, Cynthia; Wasiak, Francis; Jones, Ronald; Jackson, Wallace

    2012-01-01

    The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

  9. Construction Operations Building Information Exchange (COBIE): Requirements Definition and Pilot Implementation Standard

    Science.gov (United States)

    2007-06-01

    Swalley U.S. Department of State, Overseas Buildings Operations Toby Wilson U.S. Army, Corps of Engineers, Engineer R&D Center Jeff Wix AEC3 The...exchanged in COBIE. To map those information exchanges to the IFC model, the Information Delivery Manual (IDM) process [ Wix 2007] was also used. The...Folksonomy. Wikimedia Foundation. http://en.wikipedia.org/wiki/Folksonomy/, accessed 3 August 2007. Wix , Jeffrey. 2007. Information Delivery Manual

  10. Virtual building environments (VBE) - Applying information modeling to buildings

    Energy Technology Data Exchange (ETDEWEB)

    Bazjanac, Vladimir

    2004-06-21

    A Virtual Building Environment (VBE) is a ''place'' where building industry project staffs can get help in creating Building Information Models (BIM) and in the use of virtual buildings. It consists of a group of industry software that is operated by industry experts who are also experts in the use of that software. The purpose of a VBE is to facilitate expert use of appropriate software applications in conjunction with each other to efficiently support multidisciplinary work. This paper defines BIM and virtual buildings, and describes VBE objectives, set-up and characteristics of operation. It informs about the VBE Initiative and the benefits from a couple of early VBE projects.

  11. Environmental significance of copper, lead, manganese, uranium and zinc speciation in the event of contaminated waters release from the Ranger Uranium Mining Complex

    International Nuclear Information System (INIS)

    Noller, B.N.; Currey, N.A.

    1983-01-01

    The likely impact of the accidental release of tailings dam water during the dry season at the Ranger Uranium Mining Complex was examined. A speciation scheme utilising sizing by filtration and ion-exchange with Chelex 100 has given an insight into the likely partitioning of zinc, copper, lead, manganese and uranium following the addition of tailings dam water to samples from waterbodies in the vicinity of the uranium mining/milling complex. The speciation findings are discussed in terms of likely toxic effects on fish

  12. Financing Build, Operate and Transfer (BOT) Projects: The Case of Islamic Instruments

    OpenAIRE

    Khan, Tariqullah

    2002-01-01

    Several member countries of the Islamic Development Bank have embarked upon a program of developing and maintaining infrastructure projects by the private sector in the framework of build operate and transfer (BOT) mechanism and its various variants. The present paper reviews these experiences and the peculiar risks associated with investments in these projects as compared to the risks of traditional manufacturing sector and offers a framework for Islamic instruments to finance BOT projects.

  13. Diverse interpretations of confidence building

    International Nuclear Information System (INIS)

    Macintosh, J.

    1998-01-01

    This paper explores the variety of operational understandings associated with the term 'confidence building'. Collectively, these understandings constitute what should be thought of as a 'family' of confidence building approaches. This unacknowledged and generally unappreciated proliferation of operational understandings that function under the rubric of confidence building appears to be an impediment to effective policy. The paper's objective is to analyze these different understandings, stressing the important differences in their underlying assumptions. In the process, the paper underlines the need for the international community to clarify its collective thinking about what it means when it speaks of 'confidence building'. Without enhanced clarity, it will be unnecessarily difficult to employ the confidence building approach effectively due to the lack of consistent objectives and common operating assumptions. Although it is not the intention of this paper to promote a particular account of confidence building, dissecting existing operational understandings should help to identify whether there are fundamental elements that define what might be termed 'authentic' confidence building. Implicit here is the view that some operational understandings of confidence building may diverge too far from consensus models to count as meaningful members of the confidence building family. (author)

  14. MEMORY OPERATION AND ATTENTION CONCENTRATION FEATURES OF BUILDING PROFESSIONALLY ORIENTED FOREIGN LANGUAGE COMMUNICATIVE STRATEGIES IN PERSPECTIVE PROGRAMMERS

    Directory of Open Access Journals (Sweden)

    Ірина Семеряк

    2015-09-01

    Full Text Available Memory operation and attention concentration features of building professionally oriented foreign language communicative strategies in perspective programmers have been analyzed in the article. The features of functioning and role of short-term, sensory, operational, long-term, semantic memory in the process of building foreign language professionally oriented communicative strategies in students majoring in programming have been in the spotlight of the author’s attention. Special conditions for successful memorizing of studying material by students have been identified. In the course of the pilot study it has been proven that active methods of teaching / learning enchance high concentration and makes it possible to activate long-term memory and, as a result, reflect necessary studying material in it. The impact of concentration on the efficiency of building professionally oriented foreign language communicative strategies in perspective programmers has been grounded. Mechanisms of concentration of students majoring in programming on studying activity have been analyzed.

  15. Initial operation of a solar heating and cooling system in a full-scale solar building test facility

    Science.gov (United States)

    Knoll, R. H.; Miao, D.; Hamlet, I. L.; Jensen, R. N.

    1976-01-01

    The Solar Building Test Facility (SBTF) located at Hampton, Virginia became operational in early summer of 1976. This facility is a joint effort by NASA-Lewis and NASA-Langley to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test performance of complete solar heating and cooling system, (3) investigate component interactions and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is given here, along with the objectives, test approach, expected system performance and some preliminary results.

  16. KONTRAK BUILD OPERATE TRANSFER SEBAGAI PERJANJIAN KEBIJAKAN PEMERINTAH DENGAN PIHAK SWASTA

    OpenAIRE

    Lalu Hadi Adha

    2011-01-01

    BOT (Build Operate Transfer) as a form of agreement held by the government policy with private parties is a legal act by the agency or the State   administration officials who make public policy as the object of the agreement. Although inherent in him as a body or public official, the government in implementing the contractual relationship with another party (private) legal act is not governed by public law, but based on the laws and regulations of civil law (privaat recht), as the case of le...

  17. Report of the Panel on Tactical Aircraft

    Science.gov (United States)

    1968-07-01

    Study the design, cost, and operational utility of a helmet-mounted sight coupled with a laser ranger to provide range and bearing information on...DEVELOPMENT PROGRAM for coordinated use of optical aids SENSORS INTERFACES DISPLAYS EYEGLASS EYEBALL WALLEYE LLLTV IMAGE INTENSIFIER FLIR ATAR...operational utility of a helmet-mounted sight coupled with a laser ranger to provide range and bearing infor- mation on targets sighted by visual

  18. Energy Prediction versus Energy Performance of Green Buildings in Malaysia. Comparison of Predicted and Operational Measurement of GBI Certified Green Office in Kuala Lumpur

    Directory of Open Access Journals (Sweden)

    Zaid Suzaini M

    2016-01-01

    Full Text Available Forward from the sustainability agenda of Brundtland in 1987 and the increasing demand for energy efficient buildings, the building industry has taken steps in meeting the challenge of reducing its environmental impact. Initiatives such as ‘green’ or ‘sustainable’ design have been at the forefront of architecture, while green assessment tools have been used to predict the energy performance of building during its operational phase. However, there is still a significant hap between predicted or simulated energy measurements compared to actual operational energy consumption, or is more commonly referred as the ‘performance gap’. This paper tries to bridge this gap by comparing measured operational energy consumption of a Green Building Index (GBI certified office building in Kuala Lumpur, with its predicted energy rating qualification.

  19. HVAC modifications and computerized energy analysis for the Operations Support Building at the Mars Deep Space Station at Goldstone

    Science.gov (United States)

    Halperin, A.; Stelzmuller, P.

    1986-01-01

    The key heating, ventilation, and air-conditioning (HVAC) modifications implemented at the Mars Deep Space Station's Operation Support Building at Jet Propulsion Laboratories (JPL) in order to reduce energy consumption and decrease operating costs are described. An energy analysis comparison between the computer simulated model for the building and the actual meter data was presented. The measurement performance data showed that the cumulative energy savings was about 21% for the period 1979 to 1981. The deviation from simulated data to measurement performance data was only about 3%.

  20. The intelligent customer: considerations around build-own-operate business and licensing models for small modular reactors in Canada

    International Nuclear Information System (INIS)

    Jones, K.

    2014-01-01

    An organization planning a proposal for a build-own-operate business model needs to address expanded licensee responsibilities under this model, associated regulatory impacts and how this affects their role as an 'intelligent customer'. This is particularly important for cases where builder-owner-operators plan to manufacture factory-fuelled designs and ship them to a site for installation and operation. The primary responsibility for safe conduct of licensed activities rests with the licensee. A build-own-operate model expands the scope of licensed activities to include design, manufacturing, transport, construction, and operation. The licensee must be able to demonstrate they are qualified to conduct all licensed activities including sufficient competent resources within the licensee's organization to oversee('Intelligent Customer') any work it commissions externally and the subsequent flow down through of the supply chain. This paper examines aspects that organizations need to assess the suitability of approaches that it may take to maintain in-house expertise for the control and oversight of licensed activities at all times. It considers the approach to identification of: core capabilities the licensee would need to understand its safety case under a build-own-operate model to manage licensed activities in accordance with requirements under the Nuclear Safety and Control Acta licensee's 'intelligent customer' capabilities in particular around understanding, specifying, overseeing and accepting work undertaken on its behalf by contractors. While this paper is focused on small modular reactors, being an intelligent customer applies to large commercial or research reactors equally; the size of reactor is immaterial.

  1. The intelligent customer: considerations around build-own-operate business and licensing models for small modular reactors in Canada

    Energy Technology Data Exchange (ETDEWEB)

    Jones, K., E-mail: kenneth.jones@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Ottawa, Ontario (Canada)

    2014-07-01

    An organization planning a proposal for a build-own-operate business model needs to address expanded licensee responsibilities under this model, associated regulatory impacts and how this affects their role as an 'intelligent customer'. This is particularly important for cases where builder-owner-operators plan to manufacture factory-fuelled designs and ship them to a site for installation and operation. The primary responsibility for safe conduct of licensed activities rests with the licensee. A build-own-operate model expands the scope of licensed activities to include design, manufacturing, transport, construction, and operation. The licensee must be able to demonstrate they are qualified to conduct all licensed activities including sufficient competent resources within the licensee's organization to oversee('Intelligent Customer') any work it commissions externally and the subsequent flow down through of the supply chain. This paper examines aspects that organizations need to assess the suitability of approaches that it may take to maintain in-house expertise for the control and oversight of licensed activities at all times. It considers the approach to identification of: core capabilities the licensee would need to understand its safety case under a build-own-operate model to manage licensed activities in accordance with requirements under the Nuclear Safety and Control Acta licensee's 'intelligent customer' capabilities in particular around understanding, specifying, overseeing and accepting work undertaken on its behalf by contractors. While this paper is focused on small modular reactors, being an intelligent customer applies to large commercial or research reactors equally; the size of reactor is immaterial.

  2. Tool coupling for the design and operation of building energy and control systems based on the Functional Mock-up Interface standard

    Energy Technology Data Exchange (ETDEWEB)

    Nouidui, Thierry Stephane; Wetter, Michael

    2014-03-01

    This paper describes software tools developed at the Lawrence Berkeley National Laboratory (LBNL) that can be coupled through the Functional Mock-up Interface standard in support of the design and operation of building energy and control systems. These tools have been developed to address the gaps and limitations encountered in legacy simulation tools. These tools were originally designed for the analysis of individual domains of buildings, and have been difficult to integrate with other tools for runtime data exchange. The coupling has been realized by use of the Functional Mock-up Interface for co-simulation, which standardizes an application programming interface for simulator interoperability that has been adopted in a variety of industrial domains. As a variety of coupling scenarios are possible, this paper provides users with guidance on what coupling may be best suited for their application. Furthermore, the paper illustrates how tools can be integrated into a building management system to support the operation of buildings. These tools may be a design model that is used for real-time performance monitoring, a fault detection and diagnostics algorithm, or a control sequence, each of which may be exported as a Functional Mock-up Unit and made available in a building management system as an input/output block. We anticipate that this capability can contribute to bridging the observed performance gap between design and operational energy use of buildings.

  3. Environmental assessment for the proposed construction and operation of a Genome Sequencing Facility in Building 64 at Lawrence Berkeley Laboratory, Berkeley, California

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document is an Environmental Assessment (EA) for a proposed project to modify 14,900 square feet of an existing building (Building 64) at Lawrence Berkeley Laboratory (LBL) to operate as a Genome Sequencing Facility. This EA addresses the potential environmental impacts from the proposed modifications to Building 64 and operation of the Genome Sequencing Facility. The proposed action is to modify Building 64 to provide space and equipment allowing LBL to demonstrate that the Directed DNA Sequencing Strategy can be scaled up from the current level of 750,000 base pairs per year to a facility that produces over 6,000,000 base pairs per year, while still retaining its efficiency.

  4. 49 CFR 41.110 - New DOT owned buildings and additions to buildings.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false New DOT owned buildings and additions to buildings....110 New DOT owned buildings and additions to buildings. (a) DOT Operating Administrations responsible for the design and construction of new DOT Federally owned buildings will ensure that each building is...

  5. Analisis Yuridis Pelaksanaan Alih Fungsi Aset Pemerintah Melalui Program Build Operate And Transfer (BOT) Antara Pemerintah Kota Tebing Tinggi Dengan PT. Inti Griya Prima Sakti

    OpenAIRE

    2016-01-01

    Build Operate Transfer Agreement is an action in which the government commits itself to other parties in using government’s land by other parties by constructing building and/or facilities and then exploited at a certain time which has been agreed, and then the land and buildings, as well as other facilities are handed over again to the Property Manager after the duration is over. Build Operate Transfer (BOT) Agreement is a kind of unanimous agreement (onbenoemde overeenkoms...

  6. Operational experience with open communication in the field of building automation at the IBM center Ehningen; GA-Betriebserfahrung - mit offener Kommunikation im Informatikzentrum Ehningen

    Energy Technology Data Exchange (ETDEWEB)

    Damnig, A [IBM Deutschland Informationssysteme GmbH, Ehningen bei Boeblingen (Germany)

    1995-12-31

    In chapter 21 of the anthology about building control the operational experience with open communication in the field of building automation is discussed. The following aspects are discussed: building automation at IBM in Ehningen, the FACN experience, what has been achieved? Energy and operation optimisation. (BWI) [Deutsch] Kapitel 21 des Sammelbandes ueber Building Control ist dem Thema der Betriebserfahrung mit Gebaeudeautomationen mit offener Kommunikation gewidmet. In diesem Zusammenhang werden folgende Themenbereiche angesprochen: Gebaeudeautomation bei IBM in Ehningen, das FACN-Protokoll; Betriebserfahrungen; Was wurde erreicht?; Energie- und Betriebsoptimierungen. (BWI)

  7. Solar heating and cooling of residential buildings: sizing, installation and operation of systems. 1980 edition

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This manual was prepared as a text for a training course on solar heating and cooling of residential buildings. The course and text are directed toward sizing, installation, operation, and maintenance of solar systems for space heating and hot water supply, and solar cooling is treated only briefly. (MHR)

  8. Optimal Technology Investment and Operation in Zero-Net-Energy Buildings with Demand Response

    International Nuclear Information System (INIS)

    Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; Hirohisa, Aki; Lai, Judy

    2009-01-01

    The US Department of Energy has launched the Zero-Net-Energy (ZNE) Commercial Building Initiative (CBI) in order to develop commercial buildings that produce as much energy as they use. Its objective is to make these buildings marketable by 2025 such that they minimize their energy use through cutting-edge energy-efficient technologies and meet their remaining energy needs through on-site renewable energy generation. We examine how such buildings may be implemented within the context of a cost- or carbon-minimizing microgrid that is able to adopt and operate various technologies, such as photovoltaic (PV) on-site generation, heat exchangers, solar thermal collectors, absorption chillers, and passive/demand-response technologies. We use a mixed-integer linear program (MILP) that has a multi-criteria objective function: the minimization of a weighted average of the building's annual energy costs and carbon/CO2 emissions. The MILP's constraints ensure energy balance and capacity limits. In addition, constraining the building's energy consumed to equal its energy exports enables us to explore how energy sales and demand-response measures may enable compliance with the CBI. Using a nursing home in northern California and New York with existing tariff rates and technology data, we find that a ZNE building requires ample PV capacity installed to ensure electricity sales during the day. This is complemented by investment in energy-efficient combined heat and power equipment, while occasional demand response shaves energy consumption. A large amount of storage is also adopted, which may be impractical. Nevertheless, it shows the nature of the solutions and costs necessary to achieve ZNE. For comparison, we analyze a nursing home facility in New York to examine the effects of a flatter tariff structure and different load profiles. It has trouble reaching ZNE status and its load reductions as well as efficiency measures need to be more effective than those in the CA case

  9. Operational tools to build a multicriteria territorial risk scale with multiple stakeholders

    International Nuclear Information System (INIS)

    Cailloux, Olivier; Mayag, Brice; Meyer, Patrick; Mousseau, Vincent

    2013-01-01

    Evaluating and comparing the threats and vulnerabilities associated with territorial zones according to multiple criteria (industrial activity, population, etc.) can be a time-consuming task and often requires the participation of several stakeholders. Rather than a direct evaluation of these zones, building a risk assessment scale and using it in a formal procedure permits to automate the assessment and therefore to apply it in a repeated way and in large-scale contexts and, provided the chosen procedure and scale are accepted, to make it objective. One of the main difficulties of building such a formal evaluation procedure is to account for the multiple decision makers' preferences. The procedure used in this article, ELECTRE TRI, uses the performances of each territorial zone on multiple criteria, together with preferential parameters from multiple decision makers, to qualitatively assess their associated risk level. We also present operational tools in order to implement such a procedure in practice, and show their use on a detailed example

  10. A summary of Alaska's unique cruise ship program : wastewater, air emissions, and ocean rangers

    Energy Technology Data Exchange (ETDEWEB)

    Koch, D. [Alaska Dept. of Environmental Conservation, Juneau, AK (United States)

    2009-07-01

    Increased environmental awareness has led to concerns over the impacts of cruise ships on Alaska's marine environment. Federal legislation has been passed to ensure that large cruise ships no longer dump bilge water in areas within 3 nautical miles from the state's shoreline. The state has also been legislation to regulate sewage releases from both small and large vessels. The state requires registration, fees, and plans for emissions, and hazardous and solid wastes. As a result of the regulations, all large cruise ships discharging wastewater in Alaska had advanced wastewater treatment systems by 2003. The systems consist of solids separation, enhanced aerobic digestion, ultrafiltration, reverse osmosis, and ultraviolet disinfection systems. The quality of sewage dramatically improved in the region. Ocean rangers are now inspecting approximately 88 per cent of cruise ships visiting the Alaska region. Details of recent wastewater compliance actions were presented, as well as data on wastewater and waste emission limits. tabs., figs.

  11. Experience building and operating the CMS Tier-1 computing centres

    Science.gov (United States)

    Albert, M.; Bakken, J.; Bonacorsi, D.; Brew, C.; Charlot, C.; Huang, Chih-Hao; Colling, D.; Dumitrescu, C.; Fagan, D.; Fassi, F.; Fisk, I.; Flix, J.; Giacchetti, L.; Gomez-Ceballos, G.; Gowdy, S.; Grandi, C.; Gutsche, O.; Hahn, K.; Holzman, B.; Jackson, J.; Kreuzer, P.; Kuo, C. M.; Mason, D.; Pukhaeva, N.; Qin, G.; Quast, G.; Rossman, P.; Sartirana, A.; Scheurer, A.; Schott, G.; Shih, J.; Tader, P.; Thompson, R.; Tiradani, A.; Trunov, A.

    2010-04-01

    The CMS Collaboration relies on 7 globally distributed Tier-1 computing centres located at large universities and national laboratories for a second custodial copy of the CMS RAW data and primary copy of the simulated data, data serving capacity to Tier-2 centres for analysis, and the bulk of the reprocessing and event selection capacity in the experiment. The Tier-1 sites have a challenging role in CMS because they are expected to ingest and archive data from both CERN and regional Tier-2 centres, while they export data to a global mesh of Tier-2s at rates comparable to the raw export data rate from CERN. The combined capacity of the Tier-1 centres is more than twice the resources located at CERN and efficiently utilizing this large distributed resources represents a challenge. In this article we will discuss the experience building, operating, and utilizing the CMS Tier-1 computing centres. We will summarize the facility challenges at the Tier-1s including the stable operations of CMS services, the ability to scale to large numbers of processing requests and large volumes of data, and the ability to provide custodial storage and high performance data serving. We will also present the operations experience utilizing the distributed Tier-1 centres from a distance: transferring data, submitting data serving requests, and submitting batch processing requests.

  12. Experience building and operating the CMS Tier-1 computing centres

    International Nuclear Information System (INIS)

    Albert, M; Bakken, J; Huang, Chih-Hao; Dumitrescu, C; Fagan, D; Fisk, I; Giacchetti, L; Gutsche, O; Holzman, B; Bonacorsi, D; Grandi, C; Brew, C; Jackson, J; Charlot, C; Colling, D; Fassi, F; Flix, J; Gomez-Ceballos, G; Hahn, K; Gowdy, S

    2010-01-01

    The CMS Collaboration relies on 7 globally distributed Tier-1 computing centres located at large universities and national laboratories for a second custodial copy of the CMS RAW data and primary copy of the simulated data, data serving capacity to Tier-2 centres for analysis, and the bulk of the reprocessing and event selection capacity in the experiment. The Tier-1 sites have a challenging role in CMS because they are expected to ingest and archive data from both CERN and regional Tier-2 centres, while they export data to a global mesh of Tier-2s at rates comparable to the raw export data rate from CERN. The combined capacity of the Tier-1 centres is more than twice the resources located at CERN and efficiently utilizing this large distributed resources represents a challenge. In this article we will discuss the experience building, operating, and utilizing the CMS Tier-1 computing centres. We will summarize the facility challenges at the Tier-1s including the stable operations of CMS services, the ability to scale to large numbers of processing requests and large volumes of data, and the ability to provide custodial storage and high performance data serving. We will also present the operations experience utilizing the distributed Tier-1 centres from a distance: transferring data, submitting data serving requests, and submitting batch processing requests.

  13. 77 FR 47813 - Sitka Resource Advisory Committee

    Science.gov (United States)

    2012-08-10

    .... Written comments should be sent to Lisa Hirsch, Sitka Ranger District, 204 Siginaka Way, Sitka, Alaska... entry into the building. FOR FURTHER INFORMATION CONTACT: Lisa Hirsch, RAC coordinator, USDA, Tongass NF...

  14. 77 FR 67330 - Sitka Resource Advisory Committee

    Science.gov (United States)

    2012-11-09

    .... Written comments should be sent to Lisa Hirsch, Sitka Ranger District, 204 Siginaka Way, Sitka, Alaska... entry into the building. FOR FURTHER INFORMATION CONTACT: Lisa Hirsch, RAC coordinator, USDA, Tongass NF...

  15. Triigi metskonnamaja = Triigi Forest Ranger Building / Triin Ojari

    Index Scriptorium Estoniae

    Ojari, Triin, 1974-

    2005-01-01

    Pikk postidel vundamendiga viilkatusega maja, milleni viib puidust tee. Sissepääsuhall on klaasseintega, laudis on metallist vaheosadega triibutatud, aknad kujutavad endast voodrilaua laiusi klaasist pilusid. Projekteerija AB Schults ja Partnerid. Autor Aivo Schults. Sisekujundaja Liis Raudsepp. Konstruktor: Inseneribüroo Peipman. Projekt 2003, valmis 2004. Ill.: I korruse plaan, 5 välisvaadet, sisevaade

  16. NOSArmor: Building a Secure Network Operating System

    Directory of Open Access Journals (Sweden)

    Hyeonseong Jo

    2018-01-01

    Full Text Available Software-Defined Networking (SDN, controlling underlying network devices (i.e., data plane in a logically centralized manner, is now actively adopted in many real world networking environments. It is clear that a network administrator can easily understand and manage his networking environments with the help of SDN. In SDN, a network operating system (NOS, also known as an SDN controller, is the most critical component because it should be involved in all transactions for controlling network devices, and thus the security of NOS cannot be highly exaggerated. However, in spite of its importance, no previous works have thoroughly investigated the security of NOS. In this work, to address this problem, we present the NOSArmor, which integrates several security mechanisms, named as security building block (SBB, into a consolidated SDN controller. NOSArmor consists of eight SBBs and each of them addresses different security principles of network assets. For example, while role-based authorization focuses on securing confidentiality of internal storage from malicious applications, OpenFlow protocol verifier protects availability of core service in the controller from malformed control messages received from switches. In addition, NOSArmor shows competitive performance compared to existing other controllers (i.e., ONOS, Floodlight with secureness of network assets.

  17. Wireless Sensor Applications for Building Operation and Management

    Energy Technology Data Exchange (ETDEWEB)

    Brambley, Michael R.; Kintner-Meyer, Michael CW; Katipamula, Srinivas; O' Neill, Patrick

    2005-07-29

    This chapter provides an introduction to wireless sensing technology, its potential applications in buildings, three practical examples of tests in real buildings, estimates of impacts on energy consumption, discussions of costs and practical issues in implementation, and some ideas on applications likely in the near future.

  18. Nation Building in Zimbabwe and the Challenges of Ndebele ...

    African Journals Online (AJOL)

    Abstract. This article deploys a politico-sociological historical analysis in the ... state, it has continued to haunt both the project of nationalism that ended .... revocation of the Matabeleland order-in-council of the 18th July 1894 with the ...... Ranger, T. & Vaughan, O. (eds), Legitimacy and the State in Twentieth Century Africa.

  19. Nuclear reactor building

    International Nuclear Information System (INIS)

    Oshima, Nobuaki.

    1991-01-01

    The secondary container in a nuclear reactor building is made of a transparent structure having a shielding performance such as lead glass, by which the inside of the secondary container can be seen without undergoing radiation exposure. In addition, an operator transportation facility capable of carrying about 5 to 10 operators at one time is disposed, and the side of the facility on the secondary container is constituted with a transparent material such as glass, to provide a structure capable of observing the inside of the secondary container. The ventilation and air conditioning in the operator's transportation facility is in communication with the atmosphere of a not-controlled area. Accordingly, operators at the outside of the reactor building can reach the operator's transportation facility without taking and procedures for entering the controlled area and without undergoing radiation exposure. The inside of the secondary container in the reactor building can be seen from various directions through the transparent structure having the shielding performance. (N.H.)

  20. Solar building

    OpenAIRE

    Zhang, Luxin

    2014-01-01

    In my thesis I describe the utilization of solar energy and solar energy with building integration. In introduction it is also mentioned how the solar building works, trying to make more people understand and accept the solar building. The thesis introduces different types of solar heat collectors. I compared the difference two operation modes of solar water heating system and created examples of solar water system selection. I also introduced other solar building applications. It is conv...

  1. Plant design and layout of the different buildings with respect to safety, operational and maintenance requirements

    International Nuclear Information System (INIS)

    Liebich, H.

    1981-01-01

    The descriptions and pictures in this lecture show that the arrangement of the buildings and the location of components and systems are based on proven ideas with the aim to fulfil safety, operational and maintenance requirements also from the point of view of plant layout. (orig.)

  2. Re-Assessing Green Building Performance: A Post Occupancy Evaluation of 22 GSA Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, Kimberly M.; Rauch, Emily M.; Henderson, Jordan W.; Kora, Angela R.

    2010-06-01

    2nd report on the performance of GSA's sustainably designed buildings. The purpose of this study was to provide an overview of measured whole building performance as it compares to GSA and industry baselines. The PNNL research team found the data analysis illuminated strengths and weaknesses of individual buildings as well as the portfolio of buildings. This section includes summary data, observations that cross multiple performance metrics, discussion of lessons learned from this research, and opportunities for future research. The summary of annual data for each of the performance metrics is provided in Table 25. The data represent 1 year of measurements and are not associated with any specific design features or strategies. Where available, multiple years of data were examined and there were minimal significant differences between the years. Individually focused post occupancy evaluation (POEs) would allow for more detailed analysis of the buildings. Examining building performance over multiple years could potentially offer a useful diagnostic tool for identifying building operations that are in need of operational changes. Investigating what the connection is between the building performance and the design intent would offer potential design guidance and possible insight into building operation strategies. The 'aggregate operating cost' metric used in this study represents the costs that were available for developing a comparative industry baseline for office buildings. The costs include water utilities, energy utilities, general maintenance, grounds maintenance, waste and recycling, and janitorial costs. Three of the buildings that cost more than the baseline in Figure 45 have higher maintenance costs than the baseline, and one has higher energy costs. Given the volume of data collected and analyzed for this study, the inevitable request is for a simple answer with respect to sustainably designed building performance. As previously stated

  3. Final Safety Analysis Document for Building 693 Chemical Waste Storage Building at Lawrence Livermore National Laboratory

    International Nuclear Information System (INIS)

    Salazar, R.J.; Lane, S.

    1992-02-01

    This Safety Analysis Document (SAD) for the Lawrence Livermore National Laboratory (LLNL) Building 693, Chemical Waste Storage Building (desipated as Building 693 Container Storage Unit in the Laboratory's RCRA Part B permit application), provides the necessary information and analyses to conclude that Building 693 can be operated at low risk without unduly endangering the safety of the building operating personnel or adversely affecting the public or the environment. This Building 693 SAD consists of eight sections and supporting appendices. Section 1 presents a summary of the facility designs and operations and Section 2 summarizes the safety analysis method and results. Section 3 describes the site, the facility desip, operations and management structure. Sections 4 and 5 present the safety analysis and operational safety requirements (OSRs). Section 6 reviews Hazardous Waste Management's (HWM) Quality Assurance (QA) program. Section 7 lists the references and background material used in the preparation of this report Section 8 lists acronyms, abbreviations and symbols. Appendices contain supporting analyses, definitions, and descriptions that are referenced in the body of this report

  4. Construction and operation of a support facilities (Building 729) for operation/testing of a prototype accelerator/storage ring (XLS) and machine shop for the National Synchrotron Light Source at Brookhaven National Laboratory, Upton, New York

    International Nuclear Information System (INIS)

    1992-06-01

    Proposed action is to construct at BNL a 5,600-ft 2 support building, install and operate a prototypic 200 MeV accelerator and a prototypic 700 MeV storage ring within, and to construct and operate a 15 kV substation to power the building. The accelerator and storage ring would comprise the x-ray lithography source or XLS

  5. A customer-insight led approach to building operational resilience.

    Science.gov (United States)

    Passey, Fi

    2018-01-01

    High-profile failures over the past few years have led to the disruption of banking services in the UK, with some banks' customers left unable to make or receive payments, check balances or access cash for days or weeks. Technological advances and a push towards remote channels have increased customer expectations of 'always on' - any time, any place, anywhere - and with disruptions lasting anything from a few minutes to nearly a month, the regulator is also taking an interest. Nationwide Building Society has responded positively to this challenge by defining its operational resilience strategy, a long-term plan aimed at minimising the likelihood and impact of future disruptions. Customer research was used in order to understand customer expectations, as well as define and prioritise its end-to-end customer journeys, known as business service lines. A comprehensive mapping exercise facilitated the development of strategies and investment projects to address identified vulnerabilities and increase resilience.

  6. Public feelings and environmental impacts from uranium mining inside Kakadu National Park and around Grand Canyon National Park

    International Nuclear Information System (INIS)

    McKlveen, J.W.; Kvasnicka, J.

    1989-01-01

    There are two uranium mines in the Northern Territory of Australia, Ranger and Nabarlek. The Ranger mine, the only producing operation, is located in the Kakadu National Park, which has been listed on the United Nations' World Heritage list. The park is dedicated to preserving the Australian aboriginal culture: It contains several aboriginal villages and historic sites. Uranium mining in the park has been accepted quite well by the public and the aborigines. Employees of the Ranger mine and their relatives have established a public information program that includes tours of the mining and milling operations. There is no environmental impact to the area from the mining and milling of uranium at the Ranger site. The region around the Grand Canyon contains many highgrade uranium deposits. The ore is contained in unique breccia pipe formations. The pipes, which resemble a cylinder with a diemter of ∼ 100 m and a height of ∼ 300 m, originated as limestone solution cavities located ∼ 400 m below the plateau. There are several exposed deposits along the canyon walls, but no mining operations are allowed within the park boundaries. While the real environmental impact is insignificant, the perceived impact is tremendous. Many special-interest groups have attempted to halt the mining operations. No valid environmental impacts have been predicted or observed as a result of the current mining operations. However, one mine has been delayed for religious reasons by a local tribe or native Americans

  7. PERJANJIAN BOT (BUILD OPERATE AND TRANSFER ANTARA PT. SEAWORLD INDONESIA DENGAN PT PEMBANGUNAN JAYA ANCOL Tbk

    Directory of Open Access Journals (Sweden)

    Arasina Chandra Adcha Mita

    2015-10-01

    Full Text Available Cooperation Cooperation BOT build operate and transfer (BOT is a form of cooperation agreements carried out between holders of land rights to the investor which holders of land rights would entitle the investor to erect a building for the duration of the agreement to transfer ownership of the building to holders of land rights after a period ofwake up in order to deliver an end. One form of the agreement made by PT. Jaya Ancol construction with vehicle manager of Sea World for 20 years ended 20 September 2014. This thesis entitled "Agreement Bot (Build Operate And Transfer between PT.Seaworld Indonesia with PT Building Jaya Ancol Tbk ". The purpose of this study was to determine the problems that arise in the implementation of BOT agreement between PT. Sea Wold Indonesia with PT. Jaya Ancol Tbk development and how its completion. The research method using normative juridical approach. Materials research using primary and secondary data, specifications research using descriptive analytical research, libraries and research tools using interviews, interview techniques and research data analysis method by means of qualitative methods. Based on the research that the differences in perception by each of the parties to cause problems in the BOT agreement. PT. Jaya Ancol development assume that the clause 8 subsection 5 of the Agreement between PT. Development Jaya Ancol Tbk and Sea World considers that the current agreement expires, PT. Sea World Indonesia handing back land and building project to PT. Jaya Ancol Tbk development, including supporting infrastructure and its management rights. The guidelines are used as Sea World Indonesia is clause 8 subsection  6 which states PT. Sea World Indonesia, have a perception extend the management for a maximum of 20 years, and shall notify in writing the Jaya Ancol no later than one year agreement period expires. PT. Sea World is obliged to hand over the building and its assets to PT

  8. Operative air temperature data for different measures applied on a building envelope in warm climate

    Directory of Open Access Journals (Sweden)

    Cristina Baglivo

    2018-04-01

    Full Text Available Several technical combinations have been evaluated in order to design high energy performance buildings for the warm climate. The analysis has been developed in several steps, avoiding the use of HVAC systems.The methodological approach of this study is based on a sequential search technique and it is shown on the paper entitled “Envelope Design Optimization by Thermal Modeling of a Building in a Warm Climate” [1].The Operative Air Temperature trends (TOP, for each combination, have been plotted through a dynamic simulation performed using the software TRNSYS 17 (a transient system simulation program, University of Wisconsin, Solar Energy Laboratory, USA, 2010.Starting from the simplest building configuration consisting of 9 rooms (equal-sized modules of 5 × 5 m2, the different building components are sequentially evaluated until the envelope design is optimized. The aim of this study is to perform a step-by-step simulation, simplifying as much as possible the model without making additional variables that can modify their performances. Walls, slab-on-ground floor, roof, shading and windows are among the simulated building components. The results are shown for each combination and evaluated for Brindisi, a city in southern Italy having 1083 degrees day, belonging to the national climatic zone C. The data show the trends of the TOP for each measure applied in the case study for a total of 17 combinations divided into eight steps.

  9. BubbleZERO—Design, Construction and Operation of a Transportable Research Laboratory for Low Exergy Building System Evaluation in the Tropics

    Directory of Open Access Journals (Sweden)

    Arno Schlueter

    2013-09-01

    Full Text Available We present the design, construction and operation of a novel building systems laboratory, the BubbleZERO—Zero Emission Research Operation. Our objective was to design a space to evaluate the performance of Swiss-developed low exergy building systems in the tropical climate of Singapore using an integrated design approach. The method we employed for evaluation in the tropics was to design and build a test bed out of the shipping containers that transported the prototype low exergy systems from Switzerland to Singapore. This approach resulted in a novel laboratory environment containing radiant cooling panels and decentralized air supply, along with a self-shading, inflated “bubble” skin, experimental low emissivity (LowE glazing, LED lighting, wireless sensors and distributed control. The laboratory evaluates and demonstrates for the first time in Singapore an integrated high-temperature cooling system with separate demand-controlled ventilation adapted for the tropics. It is a functional lab testing system in real tropical conditions. As such, the results showing the ability to mitigate the risk of condensation by maintaining a dew point below 18 °C by the separate decentralized ventilation are significant and necessary for potential future implementation in buildings. In addition, the control system provides new proof of concept for distributed wireless sensors and control for reliable automation of the systems. These key results are presented along with the integrated design process and real-life tropical operation of the laboratory.

  10. Micro combined heat and power operating on renewable energy for residential building

    International Nuclear Information System (INIS)

    Aoun, Bernard

    2008-01-01

    The building sector consumes more than 43% of the total national energy consumption in France leading to more than 25% of CO 2 emissions associated to this energy consumption. A large number of options exist to limit CO 2 emissions and to improve the performance of buildings. One of these options is developed in this thesis, the use of renewable energies (solar and biomass) in combined production of heat and power. Conventional systems of combined heat and power production are briefly analyzed. The major part of this work has been focused on the development of a micro-CHP system based on an organic Rankine cycle operating on renewable energies intermittent and non-intermittent (solar and wood). The working fluids have been analyzed to allow reaching high thermodynamic performance. The different promising technologies, for each components of the system are identified, depending on the working fluid. A special test bench has been designed and realized to test and characterize an oil-free vapor scroll expander suitable for our application. The different components have been sized using computerized tools developed for the modeling of the Organic Rankine cycle. A dynamic simulation tool has been developed to simulate the annual performance of the micro-CHP system operating under different climate conditions and thermal loads. Results show that the micro-CHP system could save more than 40% of the primary energy consumption and up to 60% of CO 2 emissions. The Levelized electricity cost has been calculated using economic analysis; results show that the electricity cost (50 c-euros/kWhel) is still high compared to other technologies. (author)

  11. Operation of a novel two-pipe active beam system in an office building: a thermal comfort study

    DEFF Research Database (Denmark)

    Maccarini, Alessandro; Hultmark, Göran; Bergsøe, Niels Christian

    2018-01-01

    This paper presents an investigation regarding a thermal comfort study carried out in an office building located in Jönköping, Sweden. The particularity is that, in authors’ knowledge, this is the first building equipped with a novel active beam system that operates a water loop with temperatures...... for a continuous period of 24 hours. The daily monitoring of the thermal environment showed that the room air temperature was between approximately 21 °C and 23 °C all year round. No significant vertical air temperature difference was noticed, and the draught rate was below 10% for most of the cases....

  12. Building and Deploying Remotely Operated Vehicles in the First-Year Experience

    Science.gov (United States)

    O'Brien-Gayes, A.; Fuss, K.; Gayes, P.

    2007-12-01

    Coastal Carolina University has committed to improving student retention and success in Mathematics and Science through a pilot program to engage first-year students in an applied and investigative project as part of the University's First-Year Experience (FYE). During the fall 2007 semester, five pilot sections of FYE classes, consisting of students from the College of Natural and Applied Sciences are building and deploying Remotely Operated Vehicles (ROVs). These ROV-based classes are designed to: accelerate exploration of the broad fields of science and mathematics; enlist interest in technology by engaging students in a multi-stepped, interdisciplinary problem solving experience; explore science and mathematical concepts; institute experiential learning; and build a culture of active learners to benefit student success across traditional departmental boundaries. Teams of three students (forty teams total) will build, based on the MIT Sea Perch design, and test ROVs in addition to collecting data with their ROVs. Various accessories attached to the vehicles for data collection will include temperature and light sensors, plankton nets and underwater cameras. The first-year students will then analyze the data, and the results will be documented as part of their capstone projects. Additionally, two launch days will take place on two campus ponds. Local middle and high school teachers and their students will be invited to observe this event. The teams of students with the most capable and successful ROVs will participate in a workshop held in November 2007 for regional elementary, middle and high school teachers. These students will give a presentation on the building of the ROVs and also provide a hands-on demonstration for the workshop participants. These activities will ensure an incorporation of service learning into the first semester of the freshmen experience. The desired outcomes of the ROV-based FYE classes are: increased retention at the postsecondary

  13. Building political will for HIV response: an operational model and strategy options.

    Science.gov (United States)

    Brinkerhoff, Derick W

    2016-10-01

    As global programs for HIV response look to transfer responsibility and financing increasingly to country governments, the political will to take on these responsibilities becomes increasingly prominent. However, defining and assessing political will are problematic; it involves intent and motivation, and thus is inherently difficult to observe. It is intimately connected to capacity and is contextually embedded. This article describes an operational model of political will comprised of seven components that are observable and measurable. Two case studies illustrate the application of the model and shed light on the interconnections among commitment, capacity and context: South Africa and China. Strategy options to build political will for HIV response identify possible actions for both government and civil society. Political will as a concept is most usefully viewed as integrated within larger political and bureaucratic processes, as a product of the complex array of incentives and disincentives that those processes create. However, this conclusion is not a recipe for discouragement or inaction. Agent-based conceptualizations of policy change offer a solid grounding for building political will that supports HIV policy and programs. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  14. Prediction of prestressing losses for long term operation of nuclear reactor buildings

    Directory of Open Access Journals (Sweden)

    Thillard G.

    2011-04-01

    Full Text Available Prestressed concrete is used in nuclear reactor buildings to guarantee containment and structural integrity in case of an accident. Monitoring and operating experience over 40 years has shown that prestressing losses can be much greater than the design estimation based on the usual standard laws. A method was developed to determine the realistic residual prestress level in structures, in particular for those where no embedded instrumentation was installed, taking into account in situ measurement results rather than design characteristics. The results can enable the owner to justify extending the lifespan while guaranteeing adequate safety and to define and plan adequate maintenance actions.

  15. Control Centre operations as the focus for building station teamwork - issues and resource impacts

    International Nuclear Information System (INIS)

    Mathews, G.; Lane, L.; Davey, E.

    2006-01-01

    Effective teamwork among station work groups is essential for plant production and safety in all phases of plant operation. To achieve effective teamwork, all contributing work groups must have ongoing access to and share a common perspective on station work priorities, and recognize how their individual contributions fit with and support the contributions of other groups in support of the larger station goals. Achieving and maintaining this alignment in perspective across all workgroups can be a challenge in large organizations. This paper discusses the experience at Darlington in building and maintaining station teamwork among the station workgroups in support of day-to-day plant operations. The issues encountered and the resource impacts of specific teamwork supporting practices adopted are outlined. (author)

  16. Solar energy in buildings solved by building information modeling

    Science.gov (United States)

    Chudikova, B.; Faltejsek, M.

    2018-03-01

    Building lead us to use renewable energy sources for all types of buildings. The use of solar energy is the alternatives that can be applied in a good ratio of space, price, and resultant benefits. Building Information Modelling is a modern and effective way of dealing with buildings with regard to all aspects of the life cycle. The basis is careful planning and simulation in the pre-investment phase, where it is possible to determine the effective result and influence the lifetime of the building and the cost of its operation. By simulating, analysing and insert a building model into its future environment where climate conditions and surrounding buildings play a role, it is possible to predict the usability of the solar energy and establish an ideal model. Solar systems also very affect the internal layout of buildings. Pre-investment phase analysis, with a view to future aspects, will ensure that the resulting building will be both low-energy and environmentally friendly.

  17. Examination of the optimal operation of building scale combined heat and power systems under disparate climate and GHG emissions rates

    International Nuclear Information System (INIS)

    Howard, B.; Modi, V.

    2017-01-01

    Highlights: • CHP attributable reductions, not viable by electric generation alone, are defined. • Simplified operating strategy heuristics are optimal under specific circumstances. • Phosphoric acid fuel cells yield the largest reductions except in the extremes. • Changes in baseline emissions affect the optimal system capacity and operating hours. - Abstract: This work aims to elucidate notions concerning the ideal operation and greenhouse gas (GHG) emissions benefits of combined heat and power (CHP) systems by investigating how various metrics change as a function of the GHG emissions from the underlying electricity source, building use type and climate. Additionally, a new term entitled “CHP Attributable” reductions is introduced to quantify the benefits from the simultaneous use of thermal and electric energy, removing benefits achieved solely from fuel switching and generating electricity more efficiently. The GHG emission benefits from implementing internal combustion engine, microturbines, and phosphoric acid (PA) fuel cell based CHP systems were evaluated through an optimization approach considering energy demands of prototypical hospital, office, and residential buildings in varied climates. To explore the effect of electric GHG emissions rates, the ideal operation of the CHP systems was evaluated under three scenarios: “High” GHG emissions rates, “Low” GHG emissions rates, and “Current” GHG emissions rate for a specific location. The analysis finds that PA fuel cells achieve the highest GHG emission reductions in most cases considered, though there are exceptions. Common heuristics, such as electric load following and thermal load following, are the optimal operating strategy under specific conditions. The optimal CHP capacity and operating hours both vary as a function of building type, climate and GHG emissions rates from grid electricity. GHG emissions reductions can be as high as 49% considering a PA fuel cell for a

  18. Final Environmental Assessment for the construction and operation of an office building at the Stanford Linear Accelerator Center. Part 2

    International Nuclear Information System (INIS)

    1995-08-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1107, analyzing the environmental effects relating to the construction and operation of an office building at the Stanford Linear Accelerator Center (SLAC). SLAC is a national facility operated by Stanford University, California, under contract with DOE. The center is dedicated to research in elementary particle physics and in those fields that make use of its synchrotron facilities. The objective for the construction and operation of an office building is to provide adequate office space for existing SLAC Waste Management (WM) personnel, so as to centralize WM personnel and to make WM operations more efficient and effective. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  19. Social multiplier effects: academics’ and practitioners’ perspective on the benefits of a tuberculosis operational research capacity-building program in Indonesia

    Science.gov (United States)

    Probandari, Ari; Mahendradhata, Yodi; Widjanarko, Bagoes; Alisjahbana, Bachti

    2017-01-01

    ABSTRACT Background: The Tuberculosis Operational Research Group (TORG) implemented a capacity-building model involving academics and practitioners (i.e. clinicians or program staff) in an operational research (OR) team in Indonesia. Objective: This study explored academics’ and practitioners’ perspectives regarding the benefits of participating in a tuberculosis (TB) OR capacity-building program in Indonesia. Methods: We conducted a qualitative study involving in-depth interviews with 36 academics and 23 practitioners undertaking the TORG capacity-building program. We asked open-ended questions about their experience of the program. Data were analyzed via content analysis. Results: The findings demonstrated the social multiplier effects of the OR capacity-building program. Both academics and practitioners reported perceived improvements in research knowledge, skills, and experience, and described additional individual- and institutional-level benefits. The individual-level benefits level included improvements in understanding of the TB program, motivation for research and self-satisfaction, the development/enhancement of individual networking, receipt of recognition, and new opportunities. The additional benefits reported at an institutional level included improvement in research curricula, in-house training, and program management and the development/enhancement of institutional partnerships. Conclusions: The program improved not only individuals’ capacity for conducting OR but also the quality of the TB program management and public health education. OR should be included in research methodology curricula for postgraduate public health/disease control programs. The capacity-building model, in which academics and program staff collaborated within an OR team, should be promoted. PMID:29039271

  20. VVER operational experience - effect of preconditioning and primary water chemistry on radioactivity build-up

    International Nuclear Information System (INIS)

    Zmitko, M.; Kysela, J.; Dudjakova, K.; Martykan, M.; Janesik, J.; Hanus, V.; Marcinsky, P.

    2004-01-01

    The primary coolant technology approaches currently used in VVER units are reviewed and compared with those used in PWR units. Standard and modified water chemistries differing in boron-potassium control are discussed. Preparation of the VVER Primary Water Chemistry Guidelines in the Czech Republic is noted. Operational experience of some VVER units, operated in the Czech Republic and Slovakia, in the field of the primary water chemistry, and radioactivity transport and build-up are presented. In Mochovce and Temelin units, a surface preconditioning (passivation) procedure has been applied during hot functional tests. The main principles of the controlled primary water chemistry applied during the hot functional tests are reviewed and importance of the water chemistry, technological and other relevant parameters is stressed regarding to the quality of the passive layer formed on the primary system surfaces. The first operational experience obtained in the course of beginning of these units operation is presented mainly with respect to the corrosion products coolant and surface activities. Effect of the initial passivation performed during hot functional tests and the primary water chemistry on corrosion products radioactivity level and radiation situation is discussed. (author)

  1. Building energy analysis tool

    Science.gov (United States)

    Brackney, Larry; Parker, Andrew; Long, Nicholas; Metzger, Ian; Dean, Jesse; Lisell, Lars

    2016-04-12

    A building energy analysis system includes a building component library configured to store a plurality of building components, a modeling tool configured to access the building component library and create a building model of a building under analysis using building spatial data and using selected building components of the plurality of building components stored in the building component library, a building analysis engine configured to operate the building model and generate a baseline energy model of the building under analysis and further configured to apply one or more energy conservation measures to the baseline energy model in order to generate one or more corresponding optimized energy models, and a recommendation tool configured to assess the one or more optimized energy models against the baseline energy model and generate recommendations for substitute building components or modifications.

  2. Maintenance, operation, and research (radiation) zones (MORZ) application model - a design and operation tool for intelligent buildings with application to the advanced neutron source

    International Nuclear Information System (INIS)

    Shapira, H.B.; Brown, R.A.

    1995-01-01

    This paper describes a user-friendly application tool to assist in the design, operation and maintenance of large buildings/facilities charged with complex/extensive/elaborate activities. The model centers around a specially designed, easy-access data base containing essentially all the relevant information about the facility. Our first test case is the Advanced Neutron Source (ANS) research reactor to be constructed as a center for neutron research

  3. Operative temperature drifts and occupant satisfaction with thermal environment in three office buildings using radiant heating/ cooling system

    DEFF Research Database (Denmark)

    Kolarik, Jakub; Toftum, Jørn; Olesen, Bjarne W.

    2015-01-01

    , Madrid, Spain (16000 m2), TiFS, Padua, Italy (2200 m2). Continuous measurements of operative temperature were conducted at four workplaces in each building for one year. Occupants’ satisfaction was assessed by internet based questionnaire. Results showed that mostly exceeded limits were those for 4-hour...

  4. Concepts in Building Firesafety.

    Science.gov (United States)

    Egan, M. David

    The goal of this book is to present in a graphical format the principles of design for building firesafety. The book's more than 270 illustrations represent the core of its coverage of factors affecting fire ignition and spread in buildings, building site planning for fire suppression and occupant rescue operations, protection by building…

  5. Perjanjian Bangun Guna Serah (Build, Operate And Transfer) antara Pemerintah Provinsi Sumatera Selatan dengan Pihak Swasta

    OpenAIRE

    Justisia, Vita

    2015-01-01

    Abstract: The availability of adequate infrastructure, need tosupport the implementation of national development and toimprove Indonesia's competitiveness in the global era. Toovercome this, the Government of South Sumatra Province tobuild agreement Build, Operate, and Transfer in thedevelopment of infrastructure without burdening the localbudget through cooperation with Third Parties. This article willbe assessed on what consideration the Government of SouthSumatra Province in determining sy...

  6. PV cool-build

    Energy Technology Data Exchange (ETDEWEB)

    Cross, B.; Nuh, D.

    2004-07-01

    This report summarises the findings of a project to develop a method for calculating the operating temperature of building integrated photovoltaic (BIPV) modules/laminates which are estimated to operate above ambient temperature. The aim of the study was to minimise the temperature of the BIPV in order to increase the production of clean electricity. Details are given of a series of indoor experiments, computer modelling, and outdoor measurements. The production of a readily available, user-friendly design guide for architects and building designers is discussed.

  7. geo:build - System optimisation of the cooling modus; geo:build. Systemoptimierung des Kuehlfalls von erdgekoppelter Waerme- und Kaelteversorgung

    Energy Technology Data Exchange (ETDEWEB)

    Bockelmann, Franziska; Fisch, M. Norbert [Technische Univ. Braunschweig (Germany). IGS - Inst. fuer Gebaeude- und Solartechnik; Kuehl, Lars; Petruszek, Tim [Ostfalia Hochschule fuer angewandte Wissenschaften, Wolfenbuettel (Germany). Fakultaet Versorgungstechnik; Nuessle, Fritz [Zent-Frenger GmbH, Heppenheim (Germany); Sanner, Burkhard [UbeG GbR, Wetzlar (Germany)

    2012-10-16

    The authors of the contribution under consideration report on the analysis of ground-source systems for the heating and cooling supply and especially on the optimization of the cooling trap - chiller operation and free cooling. Two main operating points are integrated in the project. Firstly, the coordination and the alternating operation between free cooling and chillers in cooling operation are considered. Secondly, there is the development of energetically as well as economically meaningful possibilities of combination of this technology. The project investigates five non-residential buildings (office buildings and hotels) metrological. First results for the cooling mode could be analysed for two buildings.

  8. 21 CFR 226.20 - Buildings.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Buildings. 226.20 Section 226.20 Food and Drugs... Facilities and Equipment § 226.20 Buildings. Buildings in which Type A medicated article(s) are manufactured... operation for their intended purpose. The building shall: (a) Provide adequate space for the orderly...

  9. FPGA Implementation of an Amplitude-Modulated Continuous-Wave Ultrasonic Ranger Using Restructured Phase-Locking Scheme

    Directory of Open Access Journals (Sweden)

    P. Sumathi

    2010-01-01

    Full Text Available An accurate ultrasonic range finder employing Sliding Discrete Fourier Transform (SDFT based restructured phase-locked loop (RPLL, which is an improved version of the recently proposed integrated phase-locking scheme (IPLL, has been expounded. This range finder principally utilizes amplitude-modulated ultrasonic waves assisted by an infrared (IR pilot signal. The phase shift between the envelope of the reference IR pilot signal and that of the received ultrasonic signal is proportional to the range. The extracted envelopes are filtered by SDFT without introducing any additional phase shift. A new RPLL is described in which the phase error is driven to zero using the quadrature signal derived from the SDFT. Further, the quadrature signal is reinforced by another cosine signal derived from a lookup table (LUT. The pulse frequency of the numerically controlled oscillator (NCO is extremely accurate, enabling fine tuning of the SDFT and RPLL also improves the lock time for the 50 Hz input signal to 0.04 s. The percentage phase error for the range 0.6 m to 6 m is about 0.2%. The VHDL codes generated for the various signal processing steps were downloaded into a Cyclone FPGA chip around which the ultrasonic ranger had been built.

  10. Soils and hydrology of the Ranger uranium mine land application site

    International Nuclear Information System (INIS)

    Willett, I.R.; Charters, C.J.; Bond, W.J.

    1992-01-01

    This paper describes the soils and hydrology of an area between Ranger Uranium Mine and Magela Creek, Northern Territory, which is being used for the disposal of retention pond water by irrigation. The soils of an alternative site are also described in less detail. The soil survey of the irrigated area indicated three mapping units differentiated on the basis of texture, colour depth, drainage and the presence of absence of ferricrete. The predominant soils in each unit were yellow earths, red earths and siliceous sands. All the soils had high (20-50%) gravel contents consisting of quartz and ferruginous materials. The gavel is expected to have little ability to retain solutes and therefore reduces the effectiveness of the bulk soil to retain solutes. The soils are generally low in clay (<20%) and organic matter <1%) and are acidic. The clay minerals were of the low activity types, predominantly kaolinite. Consequently the cation exchange capacities of the soils were very low indicating a limited capacity to retain cations. Preliminary calculations showed that the soils would be unable to retain all the cations in the applied water. In order to assess whether redox reactions are likely to be involved in the retention of radionuclides, the responses of the soils to saturation were tested in a laboratory experiment. The implications of these results for the retention of metals and radionuclides were discussed. All soils were found to have high permeabilities. Preliminary calculations showed that transmission of irrigation water to the water table would be rapid (less than 6 weeks). The soils of the alternative site were generally heavier and contained less gravel than those of the current irrigation site. They are likely to retain more solutes than the soils of the current irrigated area and may be better suited to land disposal of retention pond water. 20 refs., 6 tabs., 5 figs

  11. Principles and methods for ensuring safe operation of high-rise buildings

    Science.gov (United States)

    Korol, Oleg; Kustikova, Yuliya

    2018-03-01

    The purpose of monitoring the technical condition of high-rise buildings is to prevent possible negative situations leading to significant socio-economic losses by timely warning of the emergence of such situations. To achieve this goal, it is necessary to solve the following main tasks, such as: identifying the time and place of origin and development of negative processes that lead to the emergence of an emergency situation; analysis of the possible development of the situation in time; development of management decisions; formation and submission of warning signals; obtaining new knowledge about the operation of the object, the factors of influence on this object, the speed of development of destructive processes. When solving the above problems, an important role is played by constructing an adequate mathematical model of the object, the parameters of which should be calibrated according to the current monitoring results.

  12. Simulation of emergency response operations for a static chemical spill within a building using an opportunistic resource utilization network

    NARCIS (Netherlands)

    Lilien, L.T.; Elbes, M.W.; Ben Othmane, L.; Salih, R.M.

    2013-01-01

    We investigate supporting emergency response operations with opportunistic resource utilization networks ("oppnets"), based on a network paradigm for inviting and integrating diverse devices and systems available in the environment. We simulate chemical spill on a single floor of a building and

  13. Guidelines for Using Building Information Modeling for Energy Analysis of Buildings

    Directory of Open Access Journals (Sweden)

    Thomas Reeves

    2015-12-01

    Full Text Available Building energy modeling (BEM, a subset of building information modeling (BIM, integrates energy analysis into the design, construction, and operation and maintenance of buildings. As there are various existing BEM tools available, there is a need to evaluate the utility of these tools in various phases of the building lifecycle. The goal of this research was to develop guidelines for evaluation and selection of BEM tools to be used in particular building lifecycle phases. The objectives of this research were to: (1 Evaluate existing BEM tools; (2 Illustrate the application of the three BEM tools; (3 Re-evaluate the three BEM tools; and (4 Develop guidelines for evaluation, selection and application of BEM tools in the design, construction and operation/maintenance phases of buildings. Twelve BEM tools were initially evaluated using four criteria: interoperability, usability, available inputs, and available outputs. Each of the top three BEM tools selected based on this initial evaluation was used in a case study to simulate and evaluate energy usage, daylighting performance, and natural ventilation for two academic buildings (LEED-certified and non-LEED-certified. The results of the case study were used to re-evaluate the three BEM tools using the initial criteria with addition of the two new criteria (speed and accuracy, and to develop guidelines for evaluating and selecting BEM tools to analyze building energy performance. The major contribution of this research is the development of these guidelines that can help potential BEM users to identify the most appropriate BEM tool for application in particular building lifecycle phases.

  14. Control technologies for quadruped walking robot to facilitate carrying operations in reactor buildings

    International Nuclear Information System (INIS)

    Suganuma, Naotaka; Uehara, Takuya; Nakamura, Norihito

    2014-01-01

    At the Fukushima Daiichi Nuclear Power Station of Tokyo Electric Power Co., Inc., which was seriously damaged by the Great East Japan Earthquake of March 11, 2011, it has been difficult for workers to approach the reactor buildings due to the hazardous surrounding environment. The need has therefore arsen for remote-controlled robots to facilitate inspection and restoration work on behalf of workers in such a high-level radiation environment. Toshiba has developed a quadruped walking robot that can carry various tools for decommissioning work. This robot is capable of maintaining its balance while walking on uneven surfaces, slopes, and stairs due to the adoption of control technologies to not only autonomously determine the leg trajectories and center of gravity, but also to correct the leg landing positions and posture with operator intervention according to the walking situation. It also offers high mobility and workability through a manipulation function that allows it to unload tools carried on its back storage area by using two of its legs like arms. This quadruped walking robot was applied to the investigation of suspected water leakage areas in the reactor building of Fukushima Daiichi Nuclear Power Station Unit 2 in December 2012. (author)

  15. 47 CFR 22.383 - In-building radiation systems.

    Science.gov (United States)

    2010-10-01

    ... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.383 In-building radiation systems. Licensees may install and operate in-building radiation systems without applying for... 47 Telecommunication 2 2010-10-01 2010-10-01 false In-building radiation systems. 22.383 Section...

  16. The Role of Energy Storage in Commercial Building

    Energy Technology Data Exchange (ETDEWEB)

    Kintner-Meyer, Michael CW; Subbarao, Krishnappa; Prakash Kumar, Nirupama; Bandyopadhyay, Gopal K.; Finley, C.; Koritarov, V. S.; Molburg, J. C.; Wang, J.; Zhao, Fuli; Brackney, L.; Florita, A. R.

    2010-09-30

    Motivation and Background of Study This project was motivated by the need to understand the full value of energy storage (thermal and electric energy storage) in commercial buildings, the opportunity of benefits for building operations and the potential interactions between a building and a smart grid infrastructure. On-site or local energy storage systems are not new to the commercial building sector; they have been in place in US buildings for decades. Most building-scale storage technologies are based on thermal or electrochemical storage mechanisms. Energy storage technologies are not designed to conserve energy, and losses associated with energy conversion are inevitable. Instead, storage provides flexibility to manage load in a building or to balance load and generation in the power grid. From the building owner's perspective, storage enables load shifting to optimize energy costs while maintaining comfort. From a grid operations perspective, building storage at scale could provide additional flexibility to grid operators in managing the generation variability from intermittent renewable energy resources (wind and solar). To characterize the set of benefits, technical opportunities and challenges, and potential economic values of storage in a commercial building from both the building operation's and the grid operation's view-points is the key point of this project. The research effort was initiated in early 2010 involving Argonne National Laboratory (ANL), the National Renewable Energy Laboratory (NREL), and Pacific Northwest National Laboratory (PNNL) to quantify these opportunities from a commercial buildings perspective. This report summarizes the early discussions, literature reviews, stakeholder engagements, and initial results of analyses related to the overall role of energy storage in commercial buildings. Beyond the summary of roughly eight months of effort by the laboratories, the report attempts to substantiate the importance of

  17. Costs and Operating Dynamics of Integrating Distributed Energy Resources in Commercial and Industrial Buildings with Electric Vehicle Charging

    Science.gov (United States)

    Flores, Robert Joseph

    Growing concerns over greenhouse gas and pollutant emissions have increased the pressure to shift energy conversion paradigms from current forms to more sustainable methods, such as through the use of distributed energy resources (DER) at industrial and commercial buildings. This dissertation is concerned with the optimal design and dispatch of a DER system installed at an industrial or commercial building. An optimization model that accurately captures typical utility costs and the physical constraints of a combined cooling, heating, and power (CCHP) system is designed to size and operate a DER system at a building. The optimization model is then used with cooperative game theory to evaluate the financial performance of a CCHP investment. The CCHP model is then modified to include energy storage, solar powered generators, alternative fuel sources, carbon emission limits, and building interactions with public and fleet PEVs. Then, a separate plugin electric vehicle (PEV) refueling model is developed to determine the cost to operate a public Level 3 fast charging station. The CCHP design and dispatch results show the size of the building load and consistency of the thermal loads are critical to positive financial performance. While using the CCHP system to produce cooling can provide savings, heat production drives positive financial performance. When designing the DER system to reduce carbon emissions, the use of renewable fuels can allow for a gas turbine system with heat recovery to reduce carbon emissions for a large university by 67%. Further reductions require large photovoltaic installations coupled with energy storage or the ability to export electricity back to the grid if costs are to remain relatively low. When considering Level 3 fast charging equipment, demand charges at low PEV travel levels are sufficiently high to discourage adoption. Integration of the equipment can reduce demand charge costs only if the building maximum demand does not coincide

  18. Regional approach to building operational level capacity for disaster planning: the case of the Eastern Africa region.

    Science.gov (United States)

    Bazeyo, W; Mayega, R W; Orach, G C; Kiguli, J; Mamuya, S; Tabu, J S; Sena, L; Rugigana, E; Mapatano, M; Lewy, D; Mock, N; Burnham, G; Keim, M; Killewo, J

    2013-06-01

    The Eastern Africa region is regularly affected by a variety of disasters ranging from drought, to human conflict and population displacement. The magnitude of emergencies and response capacities is similar across the region. In order to strengthen public health disaster management capacities at the operational level in six countries of the Eastern Africa region, the USAID-funded leadership project worked through the HEALTH Alliance, a network of seven schools of public health from six countries in the region to train district-level teams. To develop a sustainable regional approach to building operational level capacity for disaster planning. This project was implemented through a higher education leadership initiative. Project activities were spear-headed by a network of Deans and Directors of public health schools within local universities in the Eastern Africa region. The leadership team envisioned a district-oriented systems change strategy. Pre-service and in-service curricula were developed regionally and district teams were formed to attend short training courses. Project activities began with a situational analysis of the disaster management capacity at national and operational levels. The next steps were chronologically the formation of country training teams and training of trainers, the development of a regional disaster management training curriculum and training materials, the cascading of training activities in the region, and the incorporation of emerging issues into the training curriculum. An evaluation model included the analysis of preparedness impact of the training program. The output from the district teams was the creation of individual district-level disaster plans and their implementation. This 4-year project focused on building operational level public health emergency response capacity, which had not previously been part of any national program. Use of the all-hazard approach rather than a scenario-based contingency planning led to the

  19. How School Facilities Managers and Business Officials Are Reducing Operating Costs and Saving Money. Energy-Smart Building Choices.

    Science.gov (United States)

    Department of Energy, Washington, DC.

    This guide addresses contributions that school facility administrators and business officials can make in an effort to reduce operating costs and free up money for capital improvements. The guide explores opportunities available to utilize energy-saving strategies at any stage in a building's life, from its initial design phase through renovation.…

  20. Green Building Adoption Index 2017

    NARCIS (Netherlands)

    Kok, Nils

    2017-01-01

    In the early 2000s, energy efficiency was for the committed few, and “green” building was a niche concept. But with the advent of strong tenant and investor interest in constructing, operating, and occupying better buildings, the concept of energy efficiency and sustainability in buildings has taken

  1. Building a Simulator with Life-like Realism for Teaching Abdominal Operations.

    Science.gov (United States)

    McGreevy, James M; O'Shea, Jennie M

    2018-01-29

    The objective of this communication is to provide an evolutionary description of an attempt to replicate the success of the Rampahl Cardiac Simulator using perfused abdominal organ blocks the way that the Rampahl Simulator uses ex vivo porcine hearts. This descriptive paper makes no attempt to prove the effectiveness of the described educational tool, but rather, outlines the successes and failures in development. The proven value of a perfused organ teaching tool, as the Rampahl Simulator, suggests that others can build upon the work described in this paper so that, in the future, perfused abdominal organs will be available to students of general surgery as a routine part of their pre-operative preparation. The Animal Resource Facility of the University of Utah, under the oversight of the University Institutional Animal Use and Care Committee (IACUC), provided the animals, operating suites and technical support. During each development phase, General Surgery Residents and Medical Students from all levels participated. In addition, operating room staff with an interest in either medical school or perfusion were invited to participate. The efforts described in this paper eventually resulted in a reliable teaching tool for abdominal procedures in that viability of the porcine abdominal organs for up to three hours after euthanasia was regularly achieved. General Surgery Teaching Programs of a size similar to the University of Utah may have access to the resources necessary to replicate this teaching tool in a cost-effective manner. However smaller teaching programs, such as those without a research facility, may not be able to adapt the procedures described in this paper. Copyright © 2018 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  2. The business and technical case for Continuous Commissioning(reg Trade Mark) for enhanced building operations. A case study: Alamo Community College District San Antonio, Texas, U.S.A

    Energy Technology Data Exchange (ETDEWEB)

    Verdict, Malcolm; Wei, Guanghua [Texas A and M Univ. System, College Station, TX (United States). Energy Systems Laboratory

    2005-07-01

    This paper provides both the business and technical cases for the 'Continuous Commissioning' of large [>25,000 square feet], buildings through a whole building diagnostic and HVAC optimization approach known as 'Continuous Commissioning'. 'Continuous Commissioning' is defined as the ongoing engineering process to resolve operating problems, improve comfort, optimize energy use and identify retrofits in existing buildings and central plant facilities. It is also known as 'building retro-commissioning' or 'building tune-up'. It involves a rigorous, whole-building, engineering evaluation of the heating and cooling systems to identify mechanical problems, inadequate or ineffective control strategies. Some of the most common problems are: 1) Improper calibration of sensors and metering, 2) inadequate control strategies for optimum operation and comfort, 3) incorrect scheduling of heating and cooling equipment, 4) lack of air and water-side economizer equipment, 5) inadequate building automation systems, and 6) inadequate operations and maintenance. The CC process, described in this paper, was successfully applied at Alamo Community College District (ACCD) in San Antonio, Texas, USA by the Energy Systems Laboratory (ESL), a part of the Texas A and M Univ. System. ACCD has multiple buildings on 4 campuses with total conditioned area of 2.35 Million square feet. ACCD's business approach was unique because the cost of conducting the CC process was financed as an Energy Cost Reduction Measure (ECRM) along with several energy efficiency retrofits.

  3. Stability Operations and State-Building: Continuities and Contingencies

    National Research Council Canada - National Science Library

    Browder, Dewey A; Kaufmann, Greg

    2008-01-01

    The purpose of this academic colloquium was to identify principles and supporting policies of state-building that will enhance America's ability "to win the peace" while stabilizing chaotic regions...

  4. Energy Efficiency Building Code for Commercial Buildings in Sri Lanka

    Energy Technology Data Exchange (ETDEWEB)

    Busch, John; Greenberg, Steve; Rubinstein, Francis; Denver, Andrea; Rawner, Esther; Franconi, Ellen; Huang, Joe; Neils, Danielle

    2000-09-30

    1.1.1 To encourage energy efficient design or retrofit of commercial buildings so that they may be constructed, operated, and maintained in a manner that reduces the use of energy without constraining the building function, the comfort, health, or the productivity of the occupants and with appropriate regard for economic considerations. 1.1.2 To provide criterion and minimum standards for energy efficiency in the design or retrofit of commercial buildings and provide methods for determining compliance with them. 1.1.3 To encourage energy efficient designs that exceed these criterion and minimum standards.

  5. Energy Efficiency Building Code for Commercial Buildings in Sri Lanka

    International Nuclear Information System (INIS)

    Busch, John; Greenberg, Steve; Rubinstein, Francis; Denver, Andrea; Rawner, Esther; Franconi, Ellen; Huang, Joe; Neils, Danielle

    2000-01-01

    1.1.1 To encourage energy efficient design or retrofit of commercial buildings so that they may be constructed, operated, and maintained in a manner that reduces the use of energy without constraining the building function, the comfort, health, or the productivity of the occupants and with appropriate regard for economic considerations. 1.1.2 To provide criterion and minimum standards for energy efficiency in the design or retrofit of commercial buildings and provide methods for determining compliance with them. 1.1.3 To encourage energy efficient designs that exceed these criterion and minimum standards

  6. Life-cycle energy of residential buildings in China

    International Nuclear Information System (INIS)

    Chang, Yuan; Ries, Robert J.; Wang, Yaowu

    2013-01-01

    In the context of rapid urbanization and new construction in rural China, residential building energy consumption has the potential to increase with the expected increase in demand. A process-based hybrid life-cycle assessment model is used to quantify the life-cycle energy use for both urban and rural residential buildings in China and determine the energy use characteristics of each life cycle phase. An input–output model for the pre-use phases is based on 2007 Chinese economic benchmark data. A process-based life-cycle assessment model for estimating the operation and demolition phases uses historical energy-intensity data. Results show that operation energy in both urban and rural residential buildings is dominant and varies from 75% to 86% of life cycle energy respectively. Gaps in living standards as well as differences in building structure and materials result in a life-cycle energy intensity of urban residential buildings that is 20% higher than that of rural residential buildings. The life-cycle energy of urban residential buildings is most sensitive to the reduction of operational energy intensity excluding heating energy which depends on both the occupants' energy-saving behavior as well as the performance of the building itself. -- Highlights: •We developed a hybrid LCA model to quantify the life-cycle energy for urban and rural residential buildings in China. •Operation energy in urban and rural residential buildings is dominant, varying from 75% to 86% of life cycle energy respectively. •Compared with rural residential buildings, the life-cycle energy intensity of urban residential buildings is 20% higher. •The life-cycle energy of urban residential buildings is most sensitive to the reduction of daily activity energy

  7. Building control. Technical building systems: Automation and management; Building Control. Technische Gebaeudesysteme: Automation und Bewirtschaftung

    Energy Technology Data Exchange (ETDEWEB)

    Kranz, H.R.; Baenninger, M.; Bieler, P.; Brettschneider, J.P.; Damnig, A.; Fassbender, H.W.; Friedrichs, K.; Gauchel, J.; Hegewald, B.; Kaelin, W.; Lezius, A.; Markert, H.; Oehler, A.; Otto, J.; Puettmer, M. Jr.; Rohrbacher, H.; Schuerdt, K.; Vogt, D.; Wittling, J.

    1995-12-31

    Cost-optimised management and maintenance of buildings can no longer be carried out without electronic data processing. The present anthology gives a comprehensive overview of the planning and operation of building automation systems. The following topics are discussed: ecological cooling and facade concepts, facility management, jeopardy alarm technology, building automation, communication technology, open communication and networks, building system technology, norms and directives, building right and law. A special abstract has been prepared for each of the 23 chapters. (BWI). 260 figs., 161 refs. [Deutsch] Kostenoptimiertes Management, Bewirtschaftung und Instandhaltung von Gebaeuden sind ohne EDV nicht mehr denkbar. Das vorliegende Buch gibt einen umfassenden Ueberblick ueber Planung und Betrieb von Gebaeudeautomationssystemen. Es wird dabei auf folgende Themenkomplexe eingegangen: Oekologische Kuehl- und Fassadenkonzepte; Facility Management, Gefahrenmeldetechnik, Gebaeudeautomation; Kommunikationstechnik, offenen Kommunikation und Netzwerke; Gebaeudesystemtechnik und Installationsbus; Energiemanagement; Betreibererfahrungen; Normen und Richtlinien; Baurecht und Gesetz. Fuer alle 23 Einzelkapitel wurde eine gesonderte inhaltliche Erschliessung durchgefuehrt. (BWI)

  8. KONTRAK BUILD OPERATE TRANSFER SEBAGAI PERJANJIAN KEBIJAKAN PEMERINTAH DENGAN PIHAK SWASTA

    Directory of Open Access Journals (Sweden)

    Lalu Hadi Adha

    2011-09-01

    Full Text Available BOT (Build Operate Transfer as a form of agreement held by the government policy with private parties is a legal act by the agency or the State administration officials who make public policy as the object of the agreement. Although inherent in him as a body or public official, the government in implementing the contractual relationship with another party (private legal act is not governed by public law, but based on the laws and regulations of civil law (privaat recht, as the case of legislation that underlie civil legal actions carried out a body of citizens and civil law. The research shows that in a contractual relationship, the government as a party to the BOT contracts have no equal footing with their counterparts. This will be discussed in more depth in the study of law with the approach of juridical normative or study in a BOT contract as an agreement policy.

  9. KONTRAK BUILD OPERATE TRANSFER SEBAGAI PERJANJIAN KEBIJAKAN PEMERINTAH DENGAN PIHAK SWASTA

    Directory of Open Access Journals (Sweden)

    Lalu Hadi Adha

    2011-09-01

    Full Text Available BOT (Build Operate Transfer as a form of agreement held by the government policy with private parties is a legal act by the agency or the State   administration officials who make public policy as the object of the agreement. Although inherent in him as a body or public official, the government in implementing the contractual relationship with another party (private legal act is not governed by public law, but based on the laws and regulations of civil law (privaat recht, as the case of legislation that underlie civil legal actions carried out a body of citizens and civil law. The research shows that in a contractual relationship, the government as a party to the BOT contracts have no equal footing with their counterparts. This will be discussed in more depth in the study of law with the approach of juridical normative or study in a BOT contract as an agreement policy.   Key words : BOT contract, agreement, policy

  10. Plant design and layout of the different buildings with respect to safety, operational and maintenance requirements

    International Nuclear Information System (INIS)

    Linder, C.

    1981-01-01

    Design and layout of the buildings of a nuclear power plant are governed by the safety requirements regarding nearby population as called for by government regulations as well as by operational and maintenance requirements called for by the power utilities in order to assure smooth operation and easy service conditions. The lecture will focus on the different functional circumstances to be considered, their relative importance, criteria to be applied, pertinent regulations etc. and also give examples on the solutions to the above requirements. Main topics to be covered will be those circumstances that impose the highest demands on the civil engineering layout and design: airplane impact, earthquake, loss of coolant accident, pipe whipping, fuel cask transfer, annual overhaul, leak detection etc. (orig./RW)

  11. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    F. Habashi

    2000-06-22

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from most of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR

  12. WASTE TREATMENT BUILDING SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    Habashi, F.

    2000-01-01

    The Waste Treatment Building System provides the space, layout, structures, and embedded subsystems that support the processing of low-level liquid and solid radioactive waste generated within the Monitored Geologic Repository (MGR). The activities conducted in the Waste Treatment Building include sorting, volume reduction, and packaging of dry waste, and collecting, processing, solidification, and packaging of liquid waste. The Waste Treatment Building System is located on the surface within the protected area of the MGR. The Waste Treatment Building System helps maintain a suitable environment for the waste processing and protects the systems within the Waste Treatment Building (WTB) from most of the natural and induced environments. The WTB also confines contaminants and provides radiological protection to personnel. In addition to the waste processing operations, the Waste Treatment Building System provides space and layout for staging of packaged waste for shipment, industrial and radiological safety systems, control and monitoring of operations, safeguards and security systems, and fire protection, ventilation and utilities systems. The Waste Treatment Building System also provides the required space and layout for maintenance activities, tool storage, and administrative facilities. The Waste Treatment Building System integrates waste processing systems within its protective structure to support the throughput rates established for the MGR. The Waste Treatment Building System also provides shielding, layout, and other design features to help limit personnel radiation exposures to levels which are as low as is reasonably achievable (ALARA). The Waste Treatment Building System interfaces with the Site Generated Radiological Waste Handling System, and with other MGR systems that support the waste processing operations. The Waste Treatment Building System interfaces with the General Site Transportation System, Site Communications System, Site Water System, MGR

  13. Building Assessment Survey and Evaluation Study Summarized Data - HVAC Characteristics

    Science.gov (United States)

    In the Building Assessment Survey and Evaluation (BASE) Study Information on the characteristics of the heating, ventilation, and air conditioning (HVAC) system(s) in the entire BASE building including types of ventilation, equipment configurations, and operation and maintenance issues was acquired by examining the building plans, conducting a building walk-through, and speaking with the building owner, manager, and/or operator.

  14. Metrics for building performance assurance

    Energy Technology Data Exchange (ETDEWEB)

    Koles, G.; Hitchcock, R.; Sherman, M.

    1996-07-01

    This report documents part of the work performed in phase I of a Laboratory Directors Research and Development (LDRD) funded project entitled Building Performance Assurances (BPA). The focus of the BPA effort is to transform the way buildings are built and operated in order to improve building performance by facilitating or providing tools, infrastructure, and information. The efforts described herein focus on the development of metrics with which to evaluate building performance and for which information and optimization tools need to be developed. The classes of building performance metrics reviewed are (1) Building Services (2) First Costs, (3) Operating Costs, (4) Maintenance Costs, and (5) Energy and Environmental Factors. The first category defines the direct benefits associated with buildings; the next three are different kinds of costs associated with providing those benefits; the last category includes concerns that are broader than direct costs and benefits to the building owner and building occupants. The level of detail of the various issues reflect the current state of knowledge in those scientific areas and the ability of the to determine that state of knowledge, rather than directly reflecting the importance of these issues; it intentionally does not specifically focus on energy issues. The report describes work in progress and is intended as a resource and can be used to indicate the areas needing more investigation. Other reports on BPA activities are also available.

  15. Safety analysis report 231-Z Building

    Energy Technology Data Exchange (ETDEWEB)

    Powers, C.S.

    1989-03-01

    This report provides an intensive review of the nuclear safety of the operation of the 231-Z Building. For background information complete descriptions of the floor plan, building services, alarm systems, and glove box systems are included in this report. In addition, references are included to The Plutonium Laboratory Radiation Work Procedures, Safety Guides, 231-Z Operating Procedures Manual and Nuclear Materials accountability Procedures. Engineered and administrative features contribute to the overall safety of personnel, the building, and environs. The consequences of credible incidents were considered and are discussed.

  16. Design and operation of ventilation in low energy residences – A survey on code requirements and building reality from six European countries and China

    DEFF Research Database (Denmark)

    del Carmen Bocanegra-Yanez, Maria; Rojas, Gabriel; Zukowska-Tejsen, Daria

    involved in the Annex. There were two main objectives, firstly, to describe and analyse a transition between actual requirements (national building codes and standards) and current practice. Secondly, to investigate current barriers and challenges regarding installation of mechanical ventilation......One of the key objectives of the IEA Annex 68 research programme entitled “Indoor Air Quality Design and Control in Low Energy Residential Buildings” is to provide a generic guideline for the design and operation of ventilation in residential buildings. Modern and refurnished domestic buildings...

  17. Building thermography as a tool in energy audits and building commissioning procedure

    Science.gov (United States)

    Kauppinen, Timo

    2007-04-01

    A Building Commissioning-project (ToVa) was launched in Finland in the year 2003. A comprehensive commissioning procedure, including the building process and operation stage was developed in the project. This procedure will confirm the precise documentation of client's goals, definition of planning goals and the performance of the building. It is rather usual, that within 1-2 years after introduction the users complain about the defects or performance malfunctions of the building. Thermography is one important manual tool in verifying the thermal performance of the building envelope. In this paper the results of one pilot building (a school) will be presented. In surveying the condition and energy efficiency of buildings, various auxiliary means are needed. We can compare the consumption data of the target building with other, same type of buildings by benchmarking. Energy audit helps to localize and determine the energy saving potential. The most general and also most effective auxiliary means in monitoring the thermal performance of building envelopes is an infrared camera. In this presentation some examples of the use of thermography in energy audits are presented.

  18. OpenBAN: An Open Building ANalytics Middleware for Smart Buildings

    Directory of Open Access Journals (Sweden)

    Pandarasamy Arjunan

    2016-03-01

    Full Text Available Towards the realization of smart building applications, buildings are increasingly instrumented with diverse sensors and actuators. These sensors generate large volumes of data which can be analyzed for optimizing building operations. Many building energy management tasks such as energy forecasting, disaggregation, among others require complex analytics leveraging collected sensor data. While several standalone and cloud-based systems for archiving, sharing and visualizing sensor data have emerged, their support for analyzing sensor data streams is primitive and limited to rule-based actions based on thresholds and simple aggregation functions. We develop OpenBAN, an open source sensor data analytics middleware for buildings, to make analytics an integral component of modern smart building applications. OpenBAN provides a framework of extensible sensor data processing elements for identifying various building context, which different applications can leverage. We validate the capabilities of OpenBAN by developing three representative real-world applications which are deployed in our test-bed buildings: (i household energy disaggregation, (ii detection of sprinkler usage from water meter data, and (iii electricity demand forecasting. We also provide a preliminary system performance of OpenBAN when deployed in the cloud and locally.

  19. The Role of International Investment Law in Renewable Energy Investment; focus on Build Operate and Transfer (BOT) Contracts

    OpenAIRE

    Adetiloye, Idowu Adejoke

    2014-01-01

    Renewable energy is one of the ways of reducing greenhouse gas emission. There is need for more investment in this sector. However, lack of stable regulatory framework and change in policy makes it unattractive to investors. International investment laws through its protections in investment agreement can help to mitigate risks considered by investors especially those with Build, Operate and Transfer (BOT) type of contracts.

  20. Development of a methodology for life cycle building energy ratings

    International Nuclear Information System (INIS)

    Hernandez, Patxi; Kenny, Paul

    2011-01-01

    Traditionally the majority of building energy use has been linked to its operation (heating, cooling, lighting, etc.), and much attention has been directed to reduce this energy use through technical innovation, regulatory control and assessed through a wide range of rating methods. However buildings generally employ an increasing amount of materials and systems to reduce the energy use in operation, and energy embodied in these can constitute an important part of the building's life cycle energy use. For buildings with 'zero-energy' use in operation the embodied energy is indeed the only life cycle energy use. This is not addressed by current building energy assessment and rating methods. This paper proposes a methodology to extend building energy assessment and rating methods accounting for embodied energy of building components and systems. The methodology is applied to the EU Building Energy Rating method and, as an illustration, as implemented in Irish domestic buildings. A case study dwelling is used to illustrate the importance of embodied energy on life cycle energy performance, particularly relevant when energy use in operation tends to zero. The use of the Net Energy Ratio as an indicator to select appropriate building improvement measures is also presented and discussed. - Highlights: → The definitions for 'zero energy buildings' and current building energy ratings are examined. → There is a need to integrate a life cycle perspective within building energy ratings. → A life cycle building energy rating method (LC-BER), including embodied energy is presented. → Net Energy Ratio is proposed as an indicator to select building energy improvement options.

  1. Building Energy Management Open Source Software

    Energy Technology Data Exchange (ETDEWEB)

    2017-06-20

    This is the repository for Building Energy Management Open Source Software (BEMOSS), which is an open source operating system that is engineered to improve sensing and control of equipment in small- and medium-sized commercial buildings. BEMOSS offers the following key features: (1) Open source, open architecture – BEMOSS is an open source operating system that is built upon VOLTTRON – a distributed agent platform developed by Pacific Northwest National Laboratory (PNNL). BEMOSS was designed to make it easy for hardware manufacturers to seamlessly interface their devices with BEMOSS. Software developers can also contribute to adding additional BEMOSS functionalities and applications. (2) Plug & play – BEMOSS was designed to automatically discover supported load controllers (including smart thermostats, VAV/RTUs, lighting load controllers and plug load controllers) in commercial buildings. (3) Interoperability – BEMOSS was designed to work with load control devices form different manufacturers that operate on different communication technologies and data exchange protocols. (4) Cost effectiveness – Implementation of BEMOSS deemed to be cost-effective as it was built upon a robust open source platform that can operate on a low-cost single-board computer, such as Odroid. This feature could contribute to its rapid deployment in small- or medium-sized commercial buildings. (5) Scalability and ease of deployment – With its multi-node architecture, BEMOSS provides a distributed architecture where load controllers in a multi-floor and high occupancy building could be monitored and controlled by multiple single-board computers hosting BEMOSS. This makes it possible for a building engineer to deploy BEMOSS in one zone of a building, be comfortable with its operation, and later on expand the deployment to the entire building to make it more energy efficient. (6) Ability to provide local and remote monitoring – BEMOSS provides both local and remote monitoring

  2. Possibilities and Limitations of Thermally Activated Building Systems

    DEFF Research Database (Denmark)

    Behrendt, Benjamin

    The strong political market drive towards energy savings in the building sector calls for efficient solutions. Using so called low temperature heating and high temperature cooling systems such as for instance thermally activated building systems (TABS) has a significant impact on the required...... will be mostly needed to operate the building within acceptable boundaries. It will also allow the user to see if dehumidification will be needed for undisturbed operation of TABS. With the combination of both tools it is possible to provide a holistic evaluation of a building proposal at a very early design...

  3. A Conversation on Zero Net Energy Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Torcellini, Paul A [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Eley, Charles [Consultant; Gupta, Smita [Itron; McHugh, Jon [McHugh Energy Consultants; Lui, Bing [Pacific Northwest National Laboratory; Higgins, Cathy [New Buildings Institute; Iplikci, Jessica [Energy Trust of Oregon; Rosenberg, Michael [Pacific Northwest National Laboratory

    2017-06-01

    Recently, zero net energy (ZNE) buildings have moved from state-of-the-art small project demonstrations to a more widely adopted approach across the country among various building types and sizes. States such as California set policy goals of all new residential construction to be NZE by 2020 and all commercial buildings to be NZE by 2030. However, the market for designing, constructing, and operating ZNE buildings is still relatively small. We bring together distinguished experts to share their thoughts on making ZNE buildings more widespread and mainstream from a broad perspective, including governments, utilities, energy-efficiency research institutes, and building owners. This conversation also presents the benefits of ZNE and ways to achieve that goal in the design and operation of buildings. The following is a roundtable conducted by ASHRAE Journal and Bing Liu with Charles Eley, Smita Gupta, Cathy Higgins, Jessica Iplikci, Jon McHugh, Michael Rosenberg, and Paul Torcellini.

  4. Improving building performance using smart building concept: Benefit cost ratio comparison

    Science.gov (United States)

    Berawi, Mohammed Ali; Miraj, Perdana; Sayuti, Mustika Sari; Berawi, Abdur Rohim Boy

    2017-11-01

    Smart building concept is an implementation of technology developed in the construction industry throughout the world. However, the implementation of this concept is still below expectations due to various obstacles such as higher initial cost than a conventional concept and existing regulation siding with the lowest cost in the tender process. This research aims to develop intelligent building concept using value engineering approach to obtain added value regarding quality, efficiency, and innovation. The research combined quantitative and qualitative approach using questionnaire survey and value engineering method to achieve the research objectives. The research output will show additional functions regarding technology innovation that may increase the value of a building. This study shows that smart building concept requires higher initial cost, but produces lower operational and maintenance costs. Furthermore, it also confirms that benefit-cost ratio on the smart building was much higher than a conventional building, that is 1.99 to 0.88.

  5. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7

  6. 305 Building Cold Test Facility Management Plan

    International Nuclear Information System (INIS)

    Whitehurst, R.

    1994-01-01

    This document provides direction for the conduct of business in Building 305 for cold testing tools and equipment. The Cold Test Facility represents a small portion of the overall building, and as such, the work instructions already implemented in the 305 Building will be utilized. Specific to the Cold Test there are three phases for the tools and equipment as follows: 1. Development and feature tests of sludge/fuel characterization equipment, fuel containerization equipment, and sludge containerization equipment to be used in K-Basin. 2. Functional and acceptance tests of all like equipment to be installed and operated in K-Basin. 3. Training and qualification of K-Basin Operators on equipment to be installed and operated in the Basin

  7. Environmental Evaluation of Building Materials of 5 Slovak Buildings

    Science.gov (United States)

    Porhincak, Milan; Estokova, Adriana

    2013-11-01

    Building activity has recently led to the deterioration of environment and has become unsustainable. Several strategies have been introduced in order to minimize consumption of energy and resulting CO2 emissions having their origin in the operational phase. But also other stages of Life Cycle should are important to identify the overall environmental impact of construction sector. In this paper 5 similar Slovak buildings (family houses) were analyzed in terms of environmental performance of building materials used for their structures. Evaluation included the weight of used materials, embodied energy and embodied CO2 and SO2 emissions. Analysis has proven that the selection of building materials is an important factor which influences the environmental profile. Findings of the case study indicated that materials like concrete, ceramic or thermal insulation materials based on polystyrene and mineral wool are ones with the most negative environmental impact.

  8. Round table: The New Constructions; New Build; IAEA Services Nuclear Power Reactor Technologies Construction and Operation

    International Nuclear Information System (INIS)

    Choho, Tarik; Ward, Tony; Koshy, Thomas; )

    2014-01-01

    The first round-table of Atoms for the Future 2014 focused on the topic of 'The new construction'. Attendees had the opportunity to see Tarik Choho, Chief Commercial Executive Officer at AREVA, Tony Ward, Partner and Head of Power and Utilities at EY, as well as Thomas Koshy, Head of Nuclear Power technology Development Section at the IAEA, share their respective point of view and discuss together. They first started with their own presentation before sitting together at the discussion panel. Tarik Choho explained that there are many opportunities for new builds around the world, and especially in new comer countries. Thomas Koshy brought his expert point of view as an international regulator. He showed that the technology landscape also includes new designs as well as non-electricity generation uses. Those two aspects could bring both opportunities and challenges for licensing. Tony Ward showed how difficult it was to finance such a capitalistically intensive project as a new build, and how one could try to find an electricity retail price which is acceptable for both the general private consumer and the plant operator. All speakers agreed that preparation was core to a nuclear new build project. They also pointed out that every project involves more and more actors, and that it could be challenging to let everyone have the appropriate say

  9. Commercial Building Partnership General Merchandise Energy Savings Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    The Commercial Building Partnership (CBP) paired selected commercial building owners and operators with representatives of DOE, national laboratories and private sector exports to explore energy efficiency measures across general merchandise commercial buildings.

  10. Sustainable Buildings: An Ever Evolving Target

    Directory of Open Access Journals (Sweden)

    Guillermo Quesada

    2011-02-01

    Full Text Available Environmental considerations have called for new developments in building technologies to bridge the gap between this need for lower impacts on the environment and ever increasing comfort. These developments were generally directed at the reduction of the energy consumption during operations. While this was indeed a mandatory first step, complete environmental life cycle analysis raises new questions. For instance, for a typical low thermal energy consumption building, the embodied energy of construction materials now becomes an important component of the environmental footprint. In addition, the usual practice in life cycle analysis now appears to call for some adaptation—due to variable parameters in time—to be implemented successfully in building analysis. These issues bring new challenges to reach the goal of integrated design, construction, commissioning, operation, maintenance, and decommissioning of sustainable buildings.

  11. Advanced research workshop "South Caucasus : making the best use of external assistance for stability building and for co-operation with NATO"

    Index Scriptorium Estoniae

    2003-01-01

    Leedu Kaitseministeeriumi poolt 22.-23. septembrini 2003 Vilniuses korraldatud seminaril "South Caucasus: making the best use of external assistance for stability building and for co-operation with NATO" arutati, kas ja kuidas on Lõuna-Kaukaasia regioonis võimalik rakendada Balti riikide julgeolekualase koostöö kogemusi

  12. The European Energy Performance of Buildings Directive

    DEFF Research Database (Denmark)

    Petersen, Steffen; Hviid, Christian Anker

    This paper investigates the actual energy use for building operation with the calculated energy use according to the Danish implementation of the European Energy Performance of Buildings Directive (EPBD). This is important to various stakeholders in the building industry as the calculated energy...... performance is used for estimating investment security, operating budgets and for policy making. A case study shows that the actual and calculated energy use is practically the same in an average scenario. In the worst-case uncertainty scenario, the actual energy use is 20 % higher than the corrected...

  13. Actual building energy use patterns and their implications for predictive modeling

    International Nuclear Information System (INIS)

    Heidarinejad, Mohammad; Cedeño-Laurent, Jose G.; Wentz, Joshua R.; Rekstad, Nicholas M.; Spengler, John D.; Srebric, Jelena

    2017-01-01

    Highlights: • Developed three building categories based on energy use patterns of campus buildings. • Evaluated implication of temporal energy data granularity on predictive modeling. • Demonstrated importance of monitoring daily chilled water consumption. • Identified interval electricity data as an indicator of building operation schedules. • Demonstrated a calibration process for energy modeling of a campus building. - Abstract: The main goal of this study is to understand the patterns in which commercial buildings consume energy, rather than evaluating building energy use based on aggregate utility bills typically linked to building principal tenant activity or occupancy type. The energy consumption patterns define buildings as externally-load, internally-load, or mixed-load dominated buildings. Penn State and Harvard campuses serve as case studies for this particular research project. The buildings in these two campuses use steam, chilled water, and electricity as energy commodities and maintain databases of different resolutions to include minute, hourly, daily, and monthly data instances depending on the commodity and available data acquisition system. The results of this study show monthly steam consumption directly correlates to outdoor environmental conditions for 88% of the studied buildings, while chilled water consumption has negligible correlation to the outdoor environmental conditions. Thus, in terms of monthly chilled water consumption, 86% of buildings are internally-load and mixed-load dominated, respectively. Chilled water consumption is better suited for the daily analyses compared to the monthly and hourly analyses. While the influence of building operation schedules affects the analyses at the hourly level, the monthly chilled water consumptions are not good indicators of the building energy consumption patterns. Electricity consumption at the monthly (or seasonal) level can support the building energy simulation tools for the

  14. Natural ventilation systems to enhance sustainability in buildings: a review towards zero energy buildings in schools

    Science.gov (United States)

    Gil-Baez, Maite; Barrios-Padura, Ángela; Molina-Huelva, Marta; Chacartegui, Ricardo

    2017-11-01

    European regulations set the condition of Zero Energy Buildings for new buildings since 2020, with an intermediate milestone in 2018 for public buildings, in order to control greenhouse gases emissions control and climate change mitigation. Given that main fraction of energy consumption in buildings operation is due to HVAC systems, advances in its design and operation conditions are required. One key element for energy demand control is passive design of buildings. On this purpose, different recent studies and publications analyse natural ventilation systems potential to provide indoor air quality and comfort conditions minimizing electric power consumption. In these passive systems are of special relevance their capacities as passive cooling systems as well as air renovation systems, especially in high-density occupied spaces. With adequate designs, in warm/mild climates natural ventilation systems can be used along the whole year, maintaining indoor air quality and comfort conditions with small support of other heating/cooling systems. In this paper is analysed the state of the art of natural ventilation systems applied to high density occupied spaces with special focus on school buildings. The paper shows the potential and applicability of these systems for energy savings and discusses main criteria for their adequate integration in school building designs.

  15. Analysis of Embodied Environmental Impacts of Korean Apartment Buildings Considering Major Building Materials

    Directory of Open Access Journals (Sweden)

    Seungjun Roh

    2018-05-01

    Full Text Available Because the reduction in environmental impacts (EIs of buildings using life-cycle assessment (LCA has been emphasized as a practical strategy for the sustainable development of the construction industry, studies are required to analyze not only the operational environmental impacts (OEIs of buildings, but also the embodied environmental impacts (EEIs of building materials. This study aims to analyze the EEIs of Korean apartment buildings on the basis of major building materials as part of research with the goal of reducing the EIs of buildings. For this purpose, six types of building materials (ready-mixed concrete, reinforcement steel, concrete bricks, glass, insulation, and gypsum for apartment buildings were selected as major building materials, and their inputs per unit area according to the structure types and plans of apartment buildings were derived by analyzing the design and bills of materials of 443 apartment buildings constructed in South Korea. In addition, a life-cycle scenario including the production, construction, maintenance, and end-of-life stage was constructed for each major building material. The EEIs of the apartment buildings were quantitatively assessed by applying the life-cycle inventory database (LCI DB and the Korean life-cycle impact assessment (LCIA method based on damage-oriented modeling (KOLID, and the results were analyzed.

  16. 49 CFR 41.119 - DOT regulated buildings.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false DOT regulated buildings. 41.119 Section 41.119 Transportation Office of the Secretary of Transportation SEISMIC SAFETY § 41.119 DOT regulated buildings. (a) Each DOT Operating Administration with responsibility for regulating the structural safety of buildings...

  17. Landscape Scale Management in the Ouachita Mountains - Where Operational Practices Meet Research

    Science.gov (United States)

    Hunter Speed; Ronald J. Perisho; Samuel Larry; James M. Guldin

    1999-01-01

    Implementation of ecosystem management on National Forest System lands in the Southern Region requires that the best available science be applied to support forest management practices. On the Ouachita National Forest in Arkansas, personnel from the Jessieville and Winona Ranger Districts and the Southern Research Station have developed working relationships that...

  18. Realizing High-Performance Buildings; NREL (National Renewable Energy Laboratory)

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-02

    High-performance buildings (HPBs) are exceptional examples of both design and practice. Their energy footprints are small, and these are buildings that people want to work in because of their intelligent structure, operations, and coincident comfort. However, the operation of most buildings, even ones that are properly constructed and commissioned at the start, can deviate significantly from the original design intent over time, particularly due to control system overrides and growing plug and data center loads. With early planning for systems such as submetering and occupant engagement tools, operators can identify and remedy the problems. This guide is a primer for owners and owners’ representatives who are pursuing HPBs. It describes processes that have been successful in the planning, procurement, and operation of HPBs with exceptional energy efficiency. Much of the guidance offered results from a series of semi-structured conference calls with a technical advisory group of 15 owners and operators of prominent HPBs in the United States. The guide provides a prescription for planning, achieving, and maintaining an HPB. Although the guide focuses on the operations stage of buildings, many of the operations practices are specified during the planning stage.

  19. Residential and commercial buildings

    Energy Technology Data Exchange (ETDEWEB)

    Svendsen, Svend; Furbo, S.

    2012-11-15

    Low-energy buildings can make a major contribution to general sustainable development by providing a solution to problems related to the use of fossil fuels. The EPBD (EU Directive on Energy Performance of Buildings) requirements that by 2020 new building shall be constructed to use nearly zero energy, and no fossil fuels, can be accomplished by combining low-energy buildings with renewable energy via low-temperature district heating in cities and suburbs, and via heat pumps for low-density settlements. Based on experience with passive houses, low-energy buildings meeting the energy performance requirements of 2020 are expected to cost only a few percent more than conventional buildings. The very large and rapid changes needed in the energy performance of buildings is a challenge for the building sector, but one that can be overcome by better methods of developing products and designing, constructing and operating buildings. Simulation-based analysis and optimisation, and considerations of durability, will be important here. Building may thus be transformed from an experience-based sector to one based on knowledge and research, with high-quality sustainable products and good business opportunities. (Author)

  20. Small Commercial Building Re-tuning: A Primer

    Energy Technology Data Exchange (ETDEWEB)

    Cort, Katherine A.; Hostick, Donna J.; Underhill, Ronald M.; Fernandez, Nicholas; Katipamula, Srinivas

    2013-09-30

    To help building owners and managers address issues related to energy-efficient operation of small buildings, DOE has developed a Small Building Re-tuning training curriculum. This "primer" provides additional background information to understand some of the concepts presented in the Small Building Re-tuning training. The intent is that those who are less familiar with the buidling energy concepts will review this material before taking the building re-tuning training class.

  1. Legionellosis prevention in building water and HVAC systems a practical guide for design, operation and maintenance to minimize the risk

    CERN Document Server

    Joppolo, Cesare Maria; Pitera, Luca Alberto; Angermann, Jean Pierre; Izard, Mark

    2013-01-01

    This Guidebook is a practical guide for design, operation and maintenance to minimize the risk of legionellosis in building water and HVAC systmes. It is devided into several themes such as: Air conditioning of the air (by water – humidification), Production of hot water for washing (fundamentally but not only hot water for washing) and Evaporative cooling tower.

  2. Tight or sick building syndrome

    Energy Technology Data Exchange (ETDEWEB)

    Thirumalaikolundusubramanian, P; Shanmuganadan, S [Madurai Kamaraj Univ. (India). Dept. of Geography; Uma, A [Madurai Medical Coll. (India). Dept. of Medicine and Microbiology

    1991-01-01

    Modern buildings are designed with the usual heating, air-conditioning and ventilation equipment. In most of these buildings, air is continuously recirculated and, as a result, workers suffer from tight or sick building syndrome. This syndrome is discussed with reference to symptoms of air contamination, ventilation system standards and research needs. The most common symptoms of tight building syndrome are eye, nose and throat irritation, headache, fatigue, sneezing, difficulty in wearing contact lenses, chest tightness, nausea, dizziness and dermatitis. Symptoms experienced by 50 doctors and 50 paramedical personnel working in an air-conditioned intensive care unit and operating theatres of the Government Rajaji Hospital, Madurai in India were studied by means of a questionnaire survey. In the present study, respiratory and ocular symptoms were observed more in those working in operating theatres and were believed to be due to excessive use of formaldehyde used for sterilization. Various suggestions were made to prevent sick building syndrome. Moreover, the physicians treating sick individuals should be aware of the symptoms caused by indoor air pollutants as sufferers invariably require a change of environment rather than drugs. (orig.).

  3. Building systems. Applications - technologies - demands; Vernetzte Gebaeudesysteme. Anwendungen - Technologien - Forderungen

    Energy Technology Data Exchange (ETDEWEB)

    Moehl, U. [JOHNSON CONTROLS JCI Regelungstechnik GmbH, Essen (Germany)

    2003-09-01

    The dream of the 'Smart Home' or 'Intelligent Building' seems to become reality. Building users can operate their building systems from anywhere inside and outside the building based upon proven technologies. Service providers have the opportunity to take partial or full responsibility for building systems, facility management and even care taking in an effective way. Besides all the success, there are still many hurdles that need to be managed during planning, installation and operation. This paper provides inside information on above-mentioned subject and possible areas of concern. (orig.)

  4. Optimal design and operation of a thermal storage system for a chilled water plant serving pharmaceutical buildings

    Energy Technology Data Exchange (ETDEWEB)

    Henze, Gregor P. [University of Nebraska, Architectural Engineering, Omaha, NE 68182 (United States); Biffar, Bernd; Kohn, Dietmar [Boehringer Ingelheim Pharma GmbH and Co. KG, Biberach D-88400 (Germany); Becker, Martin P. [University of Applied Sciences Biberach, Architectural Engineering, Biberach D-88400 (Germany)

    2008-07-01

    A group of buildings in the pharmaceutical industry located in Southern Germany is experiencing a trend of growing cooling loads to be met by the chilled water plant composed of 10 chillers of greatly varying cost effectiveness. With a capacity shortfall inevitable, the question arises whether to install an additional chiller or improve the utilization of the existing chillers, in particular those with low operating costs per unit cooling, through the addition of a chilled water thermal energy storage (TES) system. To provide decision support in this matter, an optimization environment was developed and validated that adopts mixed integer programming as the approach to optimizing the chiller dispatch for any load condition, while an overarching dynamic programming based optimization approach optimizes the charge/discharge strategy of the TES system. In this fashion, the chilled water plant optimization is decoupled but embedded in the TES control optimization. The approach was selected to allow for arbitrary constraints and optimization horizons, while ensuring a global optimum to the problem. Optimization scenarios have been defined that include current load conditions as well cooling loads that are elevated by 25% from current conditions in order to reflect the expected growth in cooling demand in the near future; both scenarios analyzed the impact of storage capacity by investigating several TES tank capacities. The annual optimization runs revealed that - based on the elevated cooling load scenario - the smallest TES system pays back the incremental investment necessary for the TES system in about three years; based on today's cooling loads the static payback is approximately six years. As the efficiency and cost of operating the existing chillers vary over a wide range, the TES system allows for a reduction in operating costs for the chilled water plant by avoiding the operation of inefficient chillers (such as the single-stage absorption type) and

  5. Digital building management. Computer-supported operation from design, administration and maintenance to documentation and application; Digitales Gebaeude-Management. EDV-gestuetzte Betriebsfuehrung von der Zeichnung, Administration und Instandhaltung bis zur Dokumentation und Archivierung

    Energy Technology Data Exchange (ETDEWEB)

    Schuerdt, K. [Siemens AG, Karlsruhe (Germany)

    1995-12-31

    In chapter 5 of the anthology about building control the digital building management with respect to computerised operation is described. The following aspects are discussed: the change caused by C-technologies, effective operation, digital cost transparency, data processing level, documentation by precise computer, target models, expenditure/use analysis. (BWI) [Deutsch] Kapitel 5 des Sammelbandes ueber Building Control ist dem digitalen Gebaeude-Management im Sinne einer EDV-gestuetzten Betriebsfuehrung gewidmet. Folgende Themen werden angesprochen: Der Wandel durch die C-Technologien; Effektive Betriebsfuehrung; Digitale Kostentransparenz; EDV-Ebenen; Dokumentation mit Computer-Praezision; Zielmodelle; Aufwand/Nutzen-Analyse. (BWI)

  6. Renewable Energy Applications for Existing Buildings: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Hayter, S. J.; Kandt, A.

    2011-08-01

    This paper introduces technical opportunities, means, and methods for incorporating renewable energy (RE) technologies into building designs and operations. It provides an overview of RE resources and available technologies used successfully to offset building electrical and thermal energy loads. Methods for applying these technologies in buildings and the role of building energy efficiency in successful RE projects are addressed along with tips for implementing successful RE projects.

  7. Balancing Hydronic Systems in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Ruch, Russell [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Ludwig, Peter [Partnership for Advanced Residential Retrofit, Chicago, IL (United States); Maurer, Tessa [Partnership for Advanced Residential Retrofit, Chicago, IL (United States)

    2014-07-01

    In multifamily hydronic systems, temperature imbalance may be caused by undersized piping, improperly adjusted balancing valves, inefficient water temperature and flow levels, and owner/occupant interaction with the boilers, distribution, and controls. The imbalance leads to tenant discomfort, higher energy use intensity, and inefficient building operation. This research, conducted by Building America team Partnership for Advanced Residential Retrofit, explores cost-effective distribution upgrades and balancing measures in multifamily hydronic systems, providing a resource to contractors, auditors, and building owners on best practices to improve tenant comfort and lower operating costs. The team surveyed existing knowledge on cost-effective retrofits for optimizing distribution in typical multifamily hydronic systems, with the aim of identifying common situations and solutions, and then conducted case studies on two Chicago area buildings with known balancing issues in order to quantify the extent of temperature imbalance. At one of these buildings a booster pump was installed on a loop to an underheated wing of the building. This study found that unit temperature in a multifamily hydronic building can vary as much as 61°F, particularly if windows are opened or tenants use intermittent supplemental heating sources like oven ranges. Average temperature spread at the building as a result of this retrofit decreased from 22.1°F to 15.5°F.

  8. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7

  9. Energy Flexibility in Retail Buildings

    DEFF Research Database (Denmark)

    Ma, Zheng; Billanes, Joy Dalmacio; Kjærgaard, Mikkel Baun

    2017-01-01

    Retail buildings has an important role for demand side energy flexibility because of their high energy consumption, variety of energy flexibility resources, and centralized control via building control systems. Energy flexibility requires agreements and collaborations among different actors......), with the discussion of the stakeholders’ roles and their interrelation in delivering energy flexibility with the influential factors to the actual implementation of energy flexible operation of their buildings. Based on a literature analysis, the results cover stakeholders’ types and roles, perceptions (drivers......, barriers, and benefits), energy management activities and technology adoptions, and the stakeholders’ interaction for the energy flexibility in retail buildings....

  10. Adsorption properties of the soils of the Ranger uranium mine land application area for solutes in water from Retention Pond 2

    International Nuclear Information System (INIS)

    Willett, I.R.; Bond, W.J.

    1992-01-01

    The research reported here aimed to describe the adsorption properties of the soils of Ranger's irrigation area for important constituents of RP2 water. Three kinds of experiments were conducted. For the major ions (Na + , Mg 2+ , Ca 2+ , K + , SO 4 2-, and Cl - ) measurements were made of cation and anion exchange capacities. For the minor solutes (MN 2+ , U 238 , and Ra 226 ) which undergo more specific, inner-sphere reactions with soil surfaces, the retention capacities were determined by batch adsorption isotherm methods. Lastly, column experiments were conducted to determine whether the soils could retain U 238 , Ra 226 and Pb 210 when the quantities of each radionuclide were applied in much greater quantities than was possible in the batch adsorption studies, or during the field experiment described earlier at this Workshop (Bond and Willett 1992). It was aimed to obtain information on the retention capacity of the three main soil types of the irrigation area; Unit I, II and III, respectively red earths, yellow earths and siliceous sands, in relation to soil pH. 7 refs., 4 tabs., 13 figs

  11. Annual report 1987-88

    International Nuclear Information System (INIS)

    1988-01-01

    The tenth annual report of the Supervising Scientist on the operation of the Environment Protection (Alligator Rivers Region) Act 1978 covers the period 1 July 1987 to 30 June 1988. Significant developments include the adequacy of water and sediment runoff control measures at Coronation Hill, the options aimed at reducing the chance of water release from the Ranger Uranium Mine site during the Wet season and an incident involving an overflow of material from a tailings neutralisation tank at the Ranger mine site on 1-2 February 1988

  12. The analysis of energy consumption of a commercial building in Tianjin, China

    International Nuclear Information System (INIS)

    Zhao Jing; Zhu Neng; Wu Yong

    2009-01-01

    According to statistics and field investigation, the energy consumption situation and reality of commercial building is described in this paper. As the first step of large-scale public building energy efficiency supervision system encouraged by central government of China, the energy consumption of several typical commercial buildings and public buildings was analyzed in detail. The main contents of investigation are as follows: basic information of building, operational record of energy consumption equipment, energy consumption of indoor equipments, energy-efficiency assessment of energy consumption systems and equipments, investigation of behavior energy saving, etc. On this basis further analysis and diagnosis including indoor thermal and humid environment, operation state of air-conditioning water system, operation state of air-conditioning duct system and operation management of air-conditioning system were implemented. The results show that the most energy consumption of buildings in this city is commercial buildings, which can reach to about 240 W/m 2 per year. Further analysis tells that air conditioning systems play the major role of building energy consumption, and building energy saving has great potential in this city. In this paper, the ways of diagnosis work for building energy consumption are also described and discussed. Reasonable test, diagnosis and analysis are meaningful for building energy efficiency retrofit and management.

  13. Fire under control, operating cost too. Wood pellets heating system for the fire brigade building at Gaienhofen on Lake Constance; Feuer unter Kontrolle, Betriebskosten im Griff. Die Feuerwehr in Gaienhofen/Bodensee heizt mit Holzpellets

    Energy Technology Data Exchange (ETDEWEB)

    Koenig, Klaus W.

    2008-11-15

    The fire equipment building of Gaienhofen is a new building on the edge of town, neighbouring the buildings of the local soccer and tennis clubs. All three buildings are serviced by a heating station in the basement of the fire brigade building. A solar system for water heating reduces fuel consumption and minimizes the operating cost. (orig.)

  14. Office Buildings: Assessing and Reducing Plug and Process Loads in Office Buildings (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2013-04-01

    Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.

  15. Retail Buildings: Assessing and Reducing Plug and Process Loads in Retail Buildings (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2013-04-01

    Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in retail spaces are poorly understood.

  16. Commercial Building Partnership Retail Food Sales Energy Savings Overview

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-03-01

    The Commercial Building Partnership (CBP) paired selected commercial building owners and operators with representatives of DOE, national laboratories and private sector exports to explore energy efficiency measures across general merchandise commercial buildings.

  17. Sustainable building versus ecological building

    CSIR Research Space (South Africa)

    Van Wyk, Llewellyn V

    2010-04-01

    Full Text Available and sensitivity to a site that are required to efficiently meet the energy needs of a building and occupants with renewable energy (solar, wind, geothermal, etc), designers must apply holistic design principles and take advantage of the free, naturally... monumental waste: the product which they deliver requires resources such as energy and water to operate over its entire life-cycle, a period measured in decades, and often in centuries. Throughout this process, construction activities often result...

  18. On variations of space-heating energy use in office buildings

    International Nuclear Information System (INIS)

    Lin, Hung-Wen; Hong, Tianzhen

    2013-01-01

    Highlights: • Space heating is the largest energy end use in the U.S. building sector. • A key design and operational parameters have the most influence on space heating. • Simulated results were benchmarked against actual results to analyze discrepancies. • Yearly weather changes have significant impact on space heating energy use. • Findings enable stakeholders to make better decisions on energy efficiency. - Abstract: Space heating is the largest energy end use, consuming more than seven quintillion joules of site energy annually in the U.S. building sector. A few recent studies showed discrepancies in simulated space-heating energy use among different building energy modeling programs, and the simulated results are suspected to be underpredicting reality. While various uncertainties are associated with building simulations, especially when simulations are performed by different modelers using different simulation programs for buildings with different configurations, it is crucial to identify and evaluate key driving factors to space-heating energy use in order to support the design and operation of low-energy buildings. In this study, 10 design and operation parameters for space-heating systems of two prototypical office buildings in each of three U.S. heating climates are identified and evaluated, using building simulations with EnergyPlus, to determine the most influential parameters and their impacts on variations of space-heating energy use. The influence of annual weather change on space-heating energy is also investigated using 30-year actual weather data. The simulated space-heating energy use is further benchmarked against those from similar actual office buildings in two U.S. commercial-building databases to better understand the discrepancies between simulated and actual energy use. In summary, variations of both the simulated and actual space-heating energy use of office buildings in all three heating climates can be very large. However

  19. NREL: News - New Design Tool Analyzes Cost of Operating a Building Over its

    Science.gov (United States)

    Imagine being able to estimate the energy life-cycle costs of a new building by simply entering numbers upgrades including a discounted cash-flow evaluation of a building over its lifetime and a more powerful graphing package. The cash-flow evaluation of a building is determined and discounted to the present value

  20. Best Practices Guide for High-Performance Indian Office Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Reshma [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sartor, Dale [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ghatikar, Girish [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-04-01

    This document provides best practice guidance and energy- efficiency recommendations for the design, construction, and operation of high-­performance office buildings in India. Through a discussion of learnings from exemplary projects and inputs from experts, it provides recommendations that can potentially help achieve (1) enhanced working environments, (2) economic construction/faster payback, (3) reduced operating costs, and (4) reduced greenhouse gas (GHG) emissions. It also provides ambitious (but achievable) energy performance benchmarks, both as adopted targets during building modeling (design phase) and during measurement and verification (operations phase). These benchmarks have been derived from a set of representative best-in-class office buildings in India. The best practices strategies presented in this guide would ideally help in delivering high-­performance in terms of a triad—of energy efficiency, cost efficiency, and occupant comfort and well-­being. These best practices strategies and metrics should be normalized—that is, corrected to account for building characteristics, diversity of operations, weather, and materials and construction methods.

  1. Applying science and mathematics to big data for smarter buildings.

    Science.gov (United States)

    Lee, Young M; An, Lianjun; Liu, Fei; Horesh, Raya; Chae, Young Tae; Zhang, Rui

    2013-08-01

    Many buildings are now collecting a large amount of data on operations, energy consumption, and activities through systems such as a building management system (BMS), sensors, and meters (e.g., submeters and smart meters). However, the majority of data are not utilized and are thrown away. Science and mathematics can play an important role in utilizing these big data and accurately assessing how energy is consumed in buildings and what can be done to save energy, make buildings energy efficient, and reduce greenhouse gas (GHG) emissions. This paper discusses an analytical tool that has been developed to assist building owners, facility managers, operators, and tenants of buildings in assessing, benchmarking, diagnosing, tracking, forecasting, and simulating energy consumption in building portfolios. © 2013 New York Academy of Sciences.

  2. Project materials [Commercial High Performance Buildings Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-01-01

    The Consortium for High Performance Buildings (ChiPB) is an outgrowth of DOE'S Commercial Whole Buildings Roadmapping initiatives. It is a team-driven public/private partnership that seeks to enable and demonstrate the benefit of buildings that are designed, built and operated to be energy efficient, environmentally sustainable, superior quality, and cost effective.

  3. Transaction Costs (TCs) in Building Regulations and Control for Green Buildings : Case Study of Hong Kong

    NARCIS (Netherlands)

    Fan, Ke; Qian, K.; Chan, EHW; Kähkönen, Kalle; Keinänen, Marko

    2016-01-01

    About 40% of global energy consumption and nearly one-third of global CO2 emissions are on account of buildings. In Hong Kong, buildings consume up to 90% of electricity during construction and operation, where all the design and construction of private developments is subject to control under the

  4. Building Energy Management Open Source Software

    Energy Technology Data Exchange (ETDEWEB)

    Rahman, Saifur [Virginia Polytechnic Inst. and State Univ. (Virginia Tech), Blacksburg, VA (United States)

    2017-08-25

    Funded by the U.S. Department of Energy in November 2013, a Building Energy Management Open Source Software (BEMOSS) platform was engineered to improve sensing and control of equipment in small- and medium-sized commercial buildings. According to the Energy Information Administration (EIA), small- (5,000 square feet or smaller) and medium-sized (between 5,001 to 50,000 square feet) commercial buildings constitute about 95% of all commercial buildings in the U.S. These buildings typically do not have Building Automation Systems (BAS) to monitor and control building operation. While commercial BAS solutions exist, including those from Siemens, Honeywell, Johnsons Controls and many more, they are not cost effective in the context of small- and medium-sized commercial buildings, and typically work with specific controller products from the same company. BEMOSS targets small and medium-sized commercial buildings to address this gap.

  5. Estimation and Minimization of Embodied Carbon of Buildings: A Review

    Directory of Open Access Journals (Sweden)

    Ali Akbarnezhad

    2017-01-01

    Full Text Available Building and construction is responsible for up to 30% of annual global greenhouse gas (GHG emissions, commonly reported in carbon equivalent unit. Carbon emissions are incurred in all stages of a building’s life cycle and are generally categorised into operating carbon and embodied carbon, each making varying contributions to the life cycle carbon depending on the building’s characteristics. With recent advances in reducing the operating carbon of buildings, the available literature indicates a clear shift in attention towards investigating strategies to minimize embodied carbon. However, minimizing the embodied carbon of buildings is challenging and requires evaluating the effects of embodied carbon reduction strategies on the emissions incurred in different life cycle phases, as well as the operating carbon of the building. In this paper, the available literature on strategies for reducing the embodied carbon of buildings, as well as methods for estimating the embodied carbon of buildings, is reviewed and the strengths and weaknesses of each method are highlighted.

  6. Kansas State University: DOE/KEURP Site Operator Program. Year 4, fourth quarterly report, April 1, 1995--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    Kansas State University, in support of a DOE and Kansas Electric Utilities Research Program subject contract, continues to test, evaluate, demonstrate, and develop electric vehicle and infrastructure technology. K-State is operating two Soleq EVcort vehicles. During this reporting period both vehicles were brought back to full operational status after warranty service was completed by Soleq. Vehicle failures occurred due to three unrelated battery cable failures in addition to the replacement of one battery. Both vehicles are being operated on a routine basis. K-State, along with York Technical College, has established a relationship with Troy Design and Manufacturing (TDM) Redford, Michigan. K-State has ordered no less than four Ford Ranger electric trucks from TDM. K-State is involved in the steering committee that is monitoring and refining information to direct the design and testing of these new technology vehicles. TDM should become the first automotive manufacturer certified by one of the Big Three under their Quality Vehicle Manufacturer program. Kansas State University and the Kansas Electric Utility Research Program look forward to working with TDM on their new EV program.

  7. System and method for pre-cooling of buildings

    Science.gov (United States)

    Springer, David A.; Rainer, Leo I.

    2011-08-09

    A method for nighttime pre-cooling of a building comprising inputting one or more user settings, lowering the indoor temperature reading of the building during nighttime by operating an outside air ventilation system followed, if necessary, by a vapor compression cooling system. The method provides for nighttime pre-cooling of a building that maintains indoor temperatures within a comfort range based on the user input settings, calculated operational settings, and predictions of indoor and outdoor temperature trends for a future period of time such as the next day.

  8. Operational stressors on physical performance in special operators and countermeasures to improve performance: a review of the literature.

    Science.gov (United States)

    O'Hara, Reginald; Henry, Amy; Serres, Jennifer; Russell, Dawn; Locke, Robert

    2014-01-01

    Military training in elite warfighters (e.g., U.S. Army Rangers, Navy SEALs, and U.S. Air Force Battlefield Airmen) is challenging and requires mental and physical capabilities that are akin to that of professional athletes. However, unlike professional athletes, the competitive arena is the battlefield, with winning and losing replaced by either life or death. The rigors of both physical training and prolonged deployments without adequate rest and food intake can compromise physical performance. Therefore, the primary purpose of this effort was to identify occupational stressors on the physical performance of Special Operators during training and while on missions. The secondary purpose was to suggest specific countermeasures to reduce or prevent significant decrements in physical performance and reduce musculoskeletal injuries. A search of the literature for 2000?2012 was performed using the Air Force Institute of Technology search engines (i.e., PubMed and ProQuest). There were 29 articles located and selected that specifically addressed the primary and secondary purposes of this literature review. The remaining 32 of 61 referenced articles were reviewed after initial review of the primary literature. This review indicates that operational stress (e.g., negative energy balance, high-energy expenditure, sleep deprivation, environmental extremes, heavy load carriage, etc.) associated with rigorous training and sustained operations negatively affects hormonal levels, lean muscle mass, and physical performance of Special Operators. The number of musculoskeletal injuries also increases as a result of these stressors. Commanders may use simple field tests to assess physical decrements before and during deployment to effectively plan for missions. Specific countermeasures for these known decrements are lacking in the scientific literature. Therefore, future researchers should focus on studying specific physical training programs, equipment, and other methods to

  9. Integration of fuel cells into residential buildings

    International Nuclear Information System (INIS)

    Bell, J.M.; Entchev, E.; Gusdorf, J.; Szadkowski, F.; Swinton, M.; Kalbfleisch, W.; Marchand, R.

    2004-01-01

    Integration of small combined heat and power systems (CHP) into residential buildings is challenging as the loads are small, the load diversity is limited and there are a number of unresolved issues concerning sizing, control, peak loads, emergency operation, grid connection and export, etc. Natural Resources Canada has undertaken an initiative to investigate and develop techniques for the integration of small CHP systems into residential buildings using a highly instrumented house modified to allow quick installation and thorough monitoring of CHP integration techniques as well determining the performance of the CHP systems themselves when operating in a house. The first CHP system installed was a Stirling engine residential CHP system. It was used to examine the completeness of the CHP modifications to the house, to evaluate various building integration techniques and to measure the performance of the CHP system itself. The testing demonstrated the modified house to be an excellent facility for the development of CHP building integration techniques and the testing of residential CHP systems. The Stirling engine CHP system was found to operate well and produce meaningful input to the house. A second system (residential fuel cell) is presently being installed and building integration techniques and the performance of the fuel cell will be tested over the coming year. (author)

  10. Life cycle assessment: Existing building retrofit versus replacement

    Science.gov (United States)

    Darabi, Nura

    The embodied energy in building materials constitutes a large part of the total energy required for any building (Thormark 2001, 429). In working to make buildings more energy efficient this needs to be considered. Integrating considerations about life cycle assessment for buildings and materials is one promising way to reduce the amount of energy consumption being used within the building sector and the environmental impacts associated with that energy. A life cycle assessment (LCA) model can be utilized to help evaluate the embodied energy in building materials in comparison to the buildings operational energy. This thesis takes into consideration the potential life cycle reductions in energy and CO2 emissions that can be made through an energy retrofit of an existing building verses demolition and replacement with a new energy efficient building. A 95,000 square foot institutional building built in the 1960`s was used as a case study for a building LCA, along with a calibrated energy model of the existing building created as part of a previous Masters of Building Science thesis. The chosen case study building was compared to 10 possible improvement options of either energy retrofit or replacement of the existing building with a higher energy performing building in order to see the life cycle relationship between embodied energy, operational energy, and C02 emissions. As a result of completing the LCA, it is shown under which scenarios building retrofit saves more energy over the lifespan of the building than replacement with new construction. It was calculated that energy retrofit of the chosen existing institutional building would reduce the amount of energy and C02 emissions associated with that building over its life span.

  11. Primary energy implications of different design strategies for an apartment building

    International Nuclear Information System (INIS)

    Tettey, Uniben Yao Ayikoe; Dodoo, Ambrose; Gustavsson, Leif

    2016-01-01

    In this study, we explored the effects of different design strategies on final and primary energy use for production and operation of a newly constructed apartment building. We analysed alternatives of the building “As built” as well as to energy efficiency levels of the Swedish building code and passive house criteria. Our approach is based on achieving improved versions of the building alternatives from combination of design strategies giving the lowest space heating and cooling demand and primary energy use, respectively. We found that the combination of design strategies resulting in the improved building alternatives varies depending on the approach. The improved building alternatives gave up to 19–34% reduction in operation primary energy use compared to the initial alternatives. The share of production primary energy use of the improved building alternatives was 39–54% of the total primary energy use for production, space heating, space cooling and ventilation over 50-year lifespan, compared to 31–42% for the initial alternatives. This study emphasises the importance of incorporating appropriate design strategies to reduce primary energy use for building operation and suggests that combining such strategies with careful choice of building frame materials could result in significant primary energy savings in the built environment. - Highlights: • Primary energy implications of different design strategies were analysed. • The improved building alternatives had 19–34% lower operation primary energy use. • The improved building alternatives had higher production primary energy use. • Still, the improved building alternatives had lower overall primary energy use. • Design strategies should be combined with careful building frame material choice.

  12. Towards Collaborative Data Analytics for Smart Buildings

    DEFF Research Database (Denmark)

    Lazarova-Molnar, Sanja; Mohamed, Nader

    2017-01-01

    Smart buildings are buildings equipped with the latest technological and architectural solutions, controlled by Building Management Systems (BMS), operating in fulfillment of the typical goals of increasing occupants’ comfort and reducing buildings’ energy consumption. We witness a slow...... buildings that is available for further analytics to support meeting BMS’ performance goals. For a single building to benefit from this data-based analytics, it will take a long time. Collaboration of BMS in their data analytics processes can significantly shorten this time period. This paper makes two...

  13. Balancing Hydronic Systems in Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Ruch, R.; Ludwig, P.; Maurer, T.

    2014-07-01

    In multifamily hydronic systems, temperature imbalance may be caused by undersized piping, improperly adjusted balancing valves, inefficient water temperature and flow levels, and owner/occupant interaction with the boilers, distribution and controls. The effects of imbalance include tenant discomfort, higher energy use intensity and inefficient building operation. This paper explores cost-effective distribution upgrades and balancing measures in multifamily hydronic systems, providing a resource to contractors, auditors, and building owners on best practices to improve tenant comfort and lower operating costs. The research was conducted by The Partnership for Advanced Residential Retrofit (PARR) in conjunction with Elevate Energy. The team surveyed existing knowledge on cost-effective retrofits for optimizing distribution in typical multifamily hydronic systems, with the aim of identifying common situations and solutions, and then conducted case studies on two Chicago area buildings with known balancing issues in order to quantify the extent of temperature imbalance. At one of these buildings a booster pump was installed on a loop to an underheated wing of the building. This study found that unit temperature in a multifamily hydronic building can vary as much as 61 degrees F, particularly if windows are opened or tenants use intermittent supplemental heating sources like oven ranges. Average temperature spread at the building as a result of this retrofit decreased from 22.1 degrees F to 15.5 degrees F.

  14. Combined Operations a Commonwealth Caribbean Perspective

    Science.gov (United States)

    1988-06-03

    in the overt case of the US bombing raid on Libya and more covertly the French bombing of the Greenpeace ship in Auckland New Zealand. INTERNATIONAL...2 USA Ranger Bns 2/1 PRA Infantry Bns 1/3 USA Airborne Gns 7/(-) PRM Infantry Bns .% / Bn CPF [(-) fragments of unit] . 162 ANNEX C 1. GDP US...Ranks Local Local UK, Canada Local ’’See Attached Order of Battle 164. p. BAHAMAS RSS TRINIDAD"’~ 1. GDP us 1.91 bn 1.315 bn 4.81 bn Del Budget us 34

  15. Land application of mine water causes minimal uranium loss offsite in the wet-dry tropics: Ranger Uranium Mine, Northern Territory, Australia

    International Nuclear Information System (INIS)

    Mumtaz, Saqib; Streten, Claire; Parry, David L.; McGuinness, Keith A.; Lu, Ping; Gibb, Karen S.

    2015-01-01

    Ranger Uranium Mine (RUM) is situated in the wet-dry tropics of Northern Australia. Land application (irrigation) of stockpile (ore and waste) runoff water to natural woodland on the mine lease is a key part of water management at the mine. Consequently, the soil in these Land Application Areas (LAAs) presents a range of uranium (U) and other metals concentrations. Knowledge of seasonal and temporal changes in soil U and physicochemical parameters at RUM LAAs is important to develop suitable management and rehabilitation strategies. Therefore, soil samples were collected from low, medium, high and very high U sites at RUM LAAs for two consecutive years and the effect of time and season on soil physicochemical parameters particularly U and other major solutes applied in irrigation water was measured. Concentrations of some of the solutes applied in the irrigation water such as sulphur (S), iron (Fe) and calcium (Ca) showed significant seasonal and temporal changes. Soil S, Fe and Ca concentration decreased from year 1 to year 2 and from dry to wet seasons during both years. Soil U followed the same pattern except that we recorded an increase in soil U concentrations at most of the RUM LAAs after year 2 wet season compared to year 2 dry season. Thus, these sites did not show a considerable decrease in soil U concentration from year 1 to year 2. Sites which contained elevated U after wet season 2 also had higher moisture content which suggests that pooling of U containing rainwater at these sites may be responsible for elevated U. Thus, U may be redistributed within RUM LAAs due to surface water movement. The study also suggested that a decrease in U concentrations in LAA soils at very high U (>900 mg kg"−"1) sites is most likely due to transport of particulate matter bound U by surface runoff and U may not be lost from the surface soil due to vertical movement through the soil profile. Uranium attached to particulate matter may reduce its potential for

  16. Hanford site post-NPH building inspection plan

    International Nuclear Information System (INIS)

    Wagenblast, G.R. Westinghouse Hanford

    1996-01-01

    This plan establishes consistent post-NPH building inspection procedures and defines a procedure for prioritization of buildings for inspection to ensure the safety of facilities prior to reentry. Qualification of systems for restart of operation is not included. This plan takes advantage, where possible, of existing national procedures for post-NPH inspection of buildings, of existing structural design and evaluation documentation of Hanford facilities, and current and proposed seismic instrumentation located throughout the Hanford site. A list of buildings, prioritized according to current building safety function and building vulnerability (without regard for or information about a damaging natural forces event) is provided

  17. A fuzzy-based model to implement the global safety buildings index assessment for agri-food buildings

    Directory of Open Access Journals (Sweden)

    Francesco Barreca

    2014-06-01

    Full Text Available The latest EU policies focus on the issue of food safety with a view to ensuring adequate and standard quality levels for the food produced and/or consumed within the EC. To that purpose, the environment where agricultural products are manufactured and processed plays a crucial role in achieving food hygiene. As a consequence, it is of the outmost importance to adopt proper building solutions which meet health and hygiene requirements as well as to use suitable tools to measure the levels achieved. Similarly, it is necessary to verify and evaluate the level of workers’ safety and welfare in their working environment. Workers’ safety has not only an ethical and social value but also an economic implication, since possible accidents or environmental stressors are the major causes of the lower efficiency and productivity of workers. Therefore, it is fundamental to design suitable models of analysis that allow assessing buildings as a whole, taking into account both health and hygiene safety as well as workers’ safety and welfare. Hence, this paper proposes an assessment model that, based on an established study protocol and on the application of a fuzzy logic procedure, allows assessing the global safety level of an agri-food building by means of a global safety buildings index. The model here presented is original since it uses fuzzy logic to evaluate the performances of both the technical and environmental systems of an agri-food building in terms of health and hygiene safety of the manufacturing process as well as of workers’ health and safety. The result of the assessment is expressed through a triangular fuzzy membership function which allows carrying out comparative analyses of different buildings. A specific procedure was developed to apply the model to a case study which tested its operational simplicity and the validity of its results. The proposed model allows obtaining a synthetic and global value of the building performance of

  18. Critical Analysis on the Defeat of Task Force Ranger

    National Research Council Canada - National Science Library

    Day, Clifford

    1997-01-01

    .... The final stage, UNOSOM II, involved a peace enforcement and nation building mission. On Sunday, 3 October 1993, the relative success of UNOSOM II suddenly turned violent when a US Task Force came under heavy fire from Somali gunmen...

  19. Biomimetic Architecture in Building Envelope Maintenance (A Literature

    Directory of Open Access Journals (Sweden)

    Agus Salim N.A.

    2014-01-01

    Full Text Available The study of biomimetic architecture on building envelope is the main structure of this research. The concept is believed more sustainable and efficient for energy saving, operating cost consumption, waste recycle and design renewal in the future. The inspiration from the nature developed the intention on this study to explore on what and how this concept to overcome the problems through design. Biomimicry does catch the attention of human to study more on the system and function of its nature course. The designers are not exception influenced by this concept when the form, shape, texture and colour inspired them in their design. The domination of building form will affect the building envelope as the skin of the structure. A clear impact on building failure is begun with building envelope appearance without a proper maintenance. The faults in building design place a heavy burden on the building for the rest of its operational life and there is no compensation for it. In such situations, the responsibility falls on the shoulders of the designer.

  20. OPERATIONAL LIMITATIONS FOR DEMOLITION OF A HIGHLY ALPHA CONTAMINATED BUILDING MODLES VERSUS MEASURED AIR & SURFACE ACTIVITY CONCENTRATIONS

    Energy Technology Data Exchange (ETDEWEB)

    LLOYD, E.R.

    2006-11-02

    The demolition of a facility historically used for processing and handling transuranic materials is considered. Residual alpha emitting radionuclide contamination poses an exposure hazard if released to the local environment during the demolition. The process of planning for the demolition of this highly alpha contaminated building, 232-Z, included a predemolition modeling analysis of potential exposures. Estimated emission rates were used as input to an air dispersion model to estimate frequencies of occurrence of peak air and surface exposures. Postdemolition modeling was also conducted, based on the actual demolition schedule and conditions. The modeling results indicated that downwind deposition is the main operational limitation for demolition of a highly alpha-contaminated building. During the demolition of 232-Z, airborne radiation and surface contamination were monitored. The resultant non-detect monitoring results indicate a significant level of conservatism in the modeled results. This comparison supports the use of more realistic assumption in the estimating emission rates. The resultant reduction in modeled levels of potential exposures has significant implications in terms of the projected costs of demolition of such structures.

  1. SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT

    Directory of Open Access Journals (Sweden)

    Oleynik Pavel Pavlovich

    2012-10-01

    Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined

  2. Development of the Alligator Rivers uranium deposits

    International Nuclear Information System (INIS)

    Bath, L.J.; Farthing, J.W.; Warner, R.K.

    1980-01-01

    The Alligator Rivers Uranium Province in the Northern Territory of Australia has proven uranium deposits at Jabiluka, Ranger, Koongarra and Nabarlek which contain more than 80% of the country's low-cost reasonably assured uranium resources estimated to be 290,000 t U. Following the Government's decision in 1977 to proceed with the further development of Australia's uranium resources, the region is destined to become a major producer of U 3 O 8 for export. At the time of the decision provision was made for strict controls to protect the environment, the granting of Aboriginal land rights and the creation of a major national park. The paper describes the progress made to achieve these objectives. The open-cut mining methods to be used at Ranger, Koongarra and Nabarlek are described, as well as the underground mining operations proposed for Jabiluka. Each of the treatment plants will use the conventional acid leach, solvent extraction purification process for uranium recovery. The characteristics of the treatment operations are outlined. The water-management schemes, tailings disposal methods and procedures for environment protection are also discussed. The proposed initial production capacities of the operations are: Jabiluka 2540 (expanding to 7630 in the fifth year of production); Ranger 2540 (expanding to 5080 when commercially practicable); Koongarra 850; and Nabarlek 920 t U/a. Both Nabarlek and Ranger have been granted Government development approval and construction is proceeding at each site with the expectation that normal commercial production will commence towards the end of 1980 and 1981, respectively. Planning for the Jabiluka and Koongarra projects has reached an advanced stage; each are undergoing environmental procedures and will have to reach agreement with the Aboriginals on environmental and other matters before site work can commence. (author)

  3. Buildings Interoperability Landscape

    Energy Technology Data Exchange (ETDEWEB)

    Hardin, Dave [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Stephan, Eric G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wang, Weimin [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Corbin, Charles D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Widergren, Steven E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2015-12-31

    Through its Building Technologies Office (BTO), the United States Department of Energy’s Office of Energy Efficiency and Renewable Energy (DOE-EERE) is sponsoring an effort to advance interoperability for the integration of intelligent buildings equipment and automation systems, understanding the importance of integration frameworks and product ecosystems to this cause. This is important to BTO’s mission to enhance energy efficiency and save energy for economic and environmental purposes. For connected buildings ecosystems of products and services from various manufacturers to flourish, the ICT aspects of the equipment need to integrate and operate simply and reliably. Within the concepts of interoperability lie the specification, development, and certification of equipment with standards-based interfaces that connect and work. Beyond this, a healthy community of stakeholders that contribute to and use interoperability work products must be developed. On May 1, 2014, the DOE convened a technical meeting to take stock of the current state of interoperability of connected equipment and systems in buildings. Several insights from that meeting helped facilitate a draft description of the landscape of interoperability for connected buildings, which focuses mainly on small and medium commercial buildings. This document revises the February 2015 landscape document to address reviewer comments, incorporate important insights from the Buildings Interoperability Vision technical meeting, and capture thoughts from that meeting about the topics to be addressed in a buildings interoperability vision. In particular, greater attention is paid to the state of information modeling in buildings and the great potential for near-term benefits in this area from progress and community alignment.

  4. Buildings and Health. Educational campaign for healthy buildings. Educational material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    In recent years health and comfort problems associated with the indoor climate have come to constitute a problem in Sweden. To come to grips with this a nationwide educational campaign on Buildings and Health is being run. It is directed to those involved in planning, project design, construction and management of buildings. The objective is to convey a body of knowledge to the many occupational and professional groups in the construction sector on how to avoid indoor climate problems in homes, schools, offices and other workplaces. The campaign is being run by the Swedish National Board of Housing and Planning and the Swedish Council for Building Research, in co-operation with various organizations and companies in the construction industry, and with municipalities and authorities. The knowledge which is being disseminated through the campaign is summarized in this compendium. figs., tabs.

  5. Aspects of Market Differentiation in the Building Industry

    Directory of Open Access Journals (Sweden)

    Ai-Lin Teo

    2012-11-01

    Full Text Available This paper deals with different aspects of differentiation as a strategy to maintain growth and profitability in a rapidly changing environment. The specific aim of the study was to establish constraints in the use of product differentiation as a survivor technique in the building industry. The study shows that firms in the building industry perceive the structure and operation of different markets in the building industry as substantially different. If firms are to improve their market positions by differentiating their output, they need therefore to adjust the way they operate, their resources and their skills base.The survey result also showed that a substantial proportion of all firms are not prepared to be involved in diversification but elect to operate in one market only, despite the obvious advantages of diversification. It would therefore seem likely that the changes in the way a firm operates and the resources it employs when it moves into new markets are substantial.

  6. High-performance commercial building systems

    Energy Technology Data Exchange (ETDEWEB)

    Selkowitz, Stephen

    2003-10-01

    This report summarizes key technical accomplishments resulting from the three year PIER-funded R&D program, ''High Performance Commercial Building Systems'' (HPCBS). The program targets the commercial building sector in California, an end-use sector that accounts for about one-third of all California electricity consumption and an even larger fraction of peak demand, at a cost of over $10B/year. Commercial buildings also have a major impact on occupant health, comfort and productivity. Building design and operations practices that influence energy use are deeply engrained in a fragmented, risk-averse industry that is slow to change. Although California's aggressive standards efforts have resulted in new buildings designed to use less energy than those constructed 20 years ago, the actual savings realized are still well below technical and economic potentials. The broad goal of this program is to develop and deploy a set of energy-saving technologies, strategies, and techniques, and improve processes for designing, commissioning, and operating commercial buildings, while improving health, comfort, and performance of occupants, all in a manner consistent with sound economic investment practices. Results are to be broadly applicable to the commercial sector for different building sizes and types, e.g. offices and schools, for different classes of ownership, both public and private, and for owner-occupied as well as speculative buildings. The program aims to facilitate significant electricity use savings in the California commercial sector by 2015, while assuring that these savings are affordable and promote high quality indoor environments. The five linked technical program elements contain 14 projects with 41 distinct R&D tasks. Collectively they form a comprehensive Research, Development, and Demonstration (RD&D) program with the potential to capture large savings in the commercial building sector, providing significant economic benefits to

  7. INTEGRATING HEALTH INTO BUILDINGS OF THE FUTURE.

    Science.gov (United States)

    Heidari, Leila; Younger, Margalit; Chandler, George; Gooch, James; Schramm, Paul

    2016-01-01

    The health and wellbeing of building occupants should be a key priority in the design, building, and operation of new and existing buildings. Buildings can be designed, renovated, and constructed to promote healthy environments and behaviors and mitigate adverse health outcomes. This paper highlights health in terms of the relationship between occupants and buildings, as well as the relationship of buildings to the community. In the context of larger systems, smart buildings and green infrastructure strategies serve to support public health goals. At the level of the individual building, interventions that promote health can also enhance indoor environmental quality and provide opportunities for physical activity. Navigating the various programs that use metrics to measure a building's health impacts reveals that there are multiple co-benefits of a "healthy building," including those related to the economy, environment, society, transportation, planning, and energy efficiency.

  8. AUTOMATED SYSTEM OF OPERATIONAL CONTROL HEATING AND AIR CONDITIONING OF BUILDINGS

    Directory of Open Access Journals (Sweden)

    PETRENKO A. O.

    2016-08-01

    Full Text Available Statement of the problem. Health and human performance largely determined by the conditions of climate and air quality in residential, administrative and residential and public buildings. At that, in turn, is influenced by the external environment and the climate, and the geometric dimensions of the room, and thermal performance building envelopes, and the location of the premises (Orientation, and many other factors. The result is the formation of complex systems, which control decision-making in conditions of multifactor [1]. In hygienic purposes it is necessary to strive to create the best indoor microclimate conditions, regardless of changes in the factors that affect the climate in residential, administrative and residential and public buildings. Develop systems to ensure the necessary microclimate parameters – it is a complex and important task, which will depend entirely comfortable and cozy environment for the person. The problem of the present time, there is a steady increase in the energy consumption of these systems, due to the rise in price of non-renewable energy sources, and our job is, to simulate the work of software systems necessary microclimate for the changes in the factors that affect it and to minimize the use of non-renewable energy sources. Analysis of recent research and publications. Domestic and foreign hygienists [2, 3, 4] to establish a connection between the climate in the room and in the workplace and the state of human health. Formation of the indoor climate of residential, administrative and residential and public buildings is influenced by many factors that have already noted earlier [5, 6]. Study of the processes of influence of various factors on human health is of great complexity. If we consider each process separately, and in this case they are not currently amenable to theoretical description clearer. To simulate the effect of these factors studies were conducted, which showed that, with sufficient

  9. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  10. Courthouse Prototype Building

    Energy Technology Data Exchange (ETDEWEB)

    Malhotra, Mini [ORNL; New, Joshua Ryan [ORNL; Im, Piljae [ORNL

    2018-02-01

    represent a majority of courthouse buildings. However, collectively they comprise a small fraction of total courthouse floor area in the US. Spaces and operation of courthouse also varies depending on the court type (federal court vs state court; district, appellate, versus Supreme Court) and jurisdiction (general jurisdiction, general jurisdiction trial, or special courts). Based on the statistics on courthouses, general jurisdiction trial court is considered for the prototype model. The model is assumed to be a 4-courtroom, small, 72,000 sqft three-story building including a ground level/ basement.

  11. Building America House Simulation Protocols

    Energy Technology Data Exchange (ETDEWEB)

    Hendron, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Engebrecht, Cheryn [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2010-09-01

    The House Simulation Protocol document was developed to track and manage progress toward Building America's multi-year, average whole-building energy reduction research goals for new construction and existing homes, using a consistent analytical reference point. This report summarizes the guidelines for developing and reporting these analytical results in a consistent and meaningful manner for all home energy uses using standard operating conditions.

  12. Optimized design of low energy buildings

    DEFF Research Database (Denmark)

    Rudbeck, Claus Christian; Esbensen, Peter Kjær; Svendsen, Sv Aa Højgaard

    1999-01-01

    concern which can be seen during the construction of new buildings. People want energy-friendly solutions, but they should be economical optimized. An exonomical optimized building design with respect to energy consumption is the design with the lowest total cost (investment plus operational cost over its...... to evaluate different separate solutions when they interact in the building.When trying to optimize several parameters there is a need for a method, which will show the correct price-performance of each part of a building under design. The problem with not having such a method will first be showed...

  13. Occupancy pattern in office buildings : consequences for HVAC system design and operation

    Energy Technology Data Exchange (ETDEWEB)

    Halvarsson, Johan

    2011-07-01

    The main objectives with the work presented in this thesis have been: (a) to contribute to an increased understanding of the consequences that the occupancy pattern can have on the indoor climate and for Heating, Ventilation and Air Conditioning (HVAC) system design and operation; and (b) to investigate how typical occupancy patterns can look like in office buildings. The occupancy pattern in an office is a function of the floor layout of the building, and the user organisation(s) occupying it and their way of working. The combination of these two, will decide how the users occupy the building, which in turn is an important design prerequisite/constraint for the HVAC system design process. There are many assessments related to indoor climate and HVAC that involve considerations of the occupancy pattern, reaching from estimates of internal heat and pollution loads to deciding on an appropriate control strategy of HVAC systems, or estimating the energy saving potential with demand controlled ventilation. A few numerical measures have been used to describe different aspects of the occupancy pattern. The zone based occupancy factor (OFz) expresses the ratio between the number of occupied sub-zones/rooms in a zone and the total number of sub-zones/rooms in the zone. OFz does not take the number of people into account, only whether a sub-zone/room is occupied or unoccupied. OFz can be used both to express instantaneous occupancy levels and averages over time. Superscript is used to specify the time, or time period, that the measure refers to. For instance, 06 18,wd OFz means the average OFz between 6 a.m. and 6 p.m. on working days, while the 95th percentile of OFz6{sub 1}8,wd , means the 95th percentile of all instantaneous values (one or five minute averages in the case studies) of OFz that have occurred during the same time period. The utilisation rate (UR) expresses the fraction of time that a room is occupied, within a specific time period. It is important to

  14. Method for building a nuclear power plant and layout thereof

    International Nuclear Information System (INIS)

    Matsuura, Tadashi; Ushiroda, Kouchi; Tajiri, Akinori; Yoshida, Naoto; Takeda, Masakado; Makita, Tasuo; Maezawa, Sumito; Yoshizaki, Masatoshi.

    1997-01-01

    The present invention relates to a technical field of building a nuclear power plant, and its technical issue is to reduce the scale of investment for cranes to be used in building a plurality of nuclear power plant units. In order to resolve the technical issue, in the present invention, a nuclear power plant building method is employed in building a plurality of nuclear plant units in which while an earlier building unit out of the plurality of units which is started to be built earlier is being built, a later building unit that is to be started to be built later than the earlier building unit is started to be built, and in which a common mobile crane is adapted to move between a crane operating area for the earlier building unit and a crane operating area for the later building unit so that the common mobile crane ban be used in building the plurality of units. The present invention is primarily intended for the construction of a nuclear power plant. (author) figs

  15. Ad-Hoc Sensor Networks for Maritime Interdiction Operations and Regional Security

    Science.gov (United States)

    2012-09-01

    include constraining or denying of supplies or other trading privileges, and even the liberty of moving people out of a particular area. The...line every day. This leads to flexibility and performance and cost trade -offs. Furthermore, the continuous evolution of both communication and...Ranger7 Data Sheet,” Calzoni Marine Handling and Lighting Solutions, Bologna, Italy, May 2009. [48] “ Intergrator UAV Specification Sheet,” Insitu

  16. Municipal Building Energy Usage

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — This data set contains energy use data from 2009-2014 for 139 municipally operated buildings. Metrics include: Site & Source EUI, annual electricity, natural...

  17. Synthetic building materials for transport buildings and structures

    Science.gov (United States)

    Gerasimova, Vera

    2017-10-01

    The most effective building materials account for the highest growth not only in construction of residential and public buildings, but also other capital projects including roadways, bridges, drainage, communications and other engineering projects. Advancement in the technology of more efficient and ecologically responsible insulation materials have been a priority for safety, minimal maintenance and longevity of finished construction projects. The practical use of modern building materials such as insulation, sound reduction and low energy consumption are a benefit in cost and application compared to the use of outdated heavier and labor-intensive materials. The most efficient way for maximizing insolation and sound proofing should be done during the design stages of the project according to existing codes and regulations that are required by Western Government. All methods and materials that are used need to be optimized in order to reach a high durability and low operational and maintenance cost exceeding more than 50 years of the life of the building, whether it is for public, industrial or residential use. Western construction techniques and technologies need to be applied and adapted by the Russian Federation to insure the most productive successful methods are being implemented. The issues of efficient insulation materials are outlined in this article.

  18. Safety of operations in the manufacture of driver fuel for the first charge of the Dragon Reactor and modifications to the safety document for the Dragon Fuel Element Production Building

    International Nuclear Information System (INIS)

    Beutler, H.; Cross, J.; Flamm, J.

    1965-01-01

    The manufacture of the zirconium containing 'driver' fuel and fuel elements for the First Charge of the Dragon Reactor Experiment has been completed without incident. This is a report on the safety of operations in the Dragon Fuel Element Production Building during an approximately six month period when the 'driver' fuel was manufactured and 25 elements containing this fuel were assembled and exported to the Reactor Building. The opportunity is taken to bring the Safety Document up-to-date and to report on any significant operational failures of equipment. (author)

  19. Learning from Failures in Operations

    DEFF Research Database (Denmark)

    Koch, Christian

    2005-01-01

    parallelism and fragmentation due to their predominantly quantitative complexity. It is suggested that a number of critical junctions occur in these processes and that obtaining quality and avoiding failures quite often requires a series of competent and situational operation management actions. An empirical...... product. The analysis showed that, among others, design review, project review, commencing and finalizing operations turned out to be critical junctions in the control of failures. Practical implications and improvements are discussed. The focus on critical junctions, points to supply chain management......This paper discusses failures and quality in operations in design and production of buildings. The importance of human action, interpretations and interactions in tackling complexity, fragmentation and disturbances in the building industry is underlined. Building processes encompass requisite...

  20. Assessing Sustainability in Developing Country Contexts: The Applicability of Green Building Rating Systems to Building Design and Construction in Madagascar and Tanzania

    OpenAIRE

    Ozolins, Peter Charles

    2010-01-01

    Buildings have significant and complex impacts both in their construction and in their use. Green building rating systems have been developed and promoted in more economically-advanced countries to offer guidelines to reduce negative impacts and to promote sustainable practices of building construction and operations. The green building rating system called Leadership in Energy and Environmental Design (LEED), established in 1995 by the U.S. Green Building Council, is increasingly accepted as...

  1. Solar-Heated Office Building -- Dallas, Texas

    Science.gov (United States)

    1982-01-01

    Solar heating system designed to supply 87 percent of space heating and 100 percent of potable hot-water needs of large office building in Dallas, Texas. Unique feature of array serves as roofing over office lobby and gives building attractive triangular appearance. Report includes basic system drawings, test data, operating procedures, and maintenance instructions.

  2. Cooling energy efficiency and classroom air environment of a school building operated by the heat recovery air conditioning unit

    International Nuclear Information System (INIS)

    Wang, Yang; Zhao, Fu-Yun; Kuckelkorn, Jens; Liu, Di; Liu, Li-Qun; Pan, Xiao-Chuan

    2014-01-01

    The recently-built school buildings have adopted novel heat recovery ventilator and air conditioning system. Heat recovery efficiency of the heat recovery facility and energy conservation ratio of the air conditioning unit were analytically modeled, taking the ventilation networks into account. Following that, school classroom displacement ventilation and its thermal stratification and indoor air quality indicated by the CO 2 concentration have been numerically modeled concerning the effects of delivering ventilation flow rate and supplying air temperature. Numerical results indicate that the promotion of mechanical ventilation rate can simultaneously boost the dilution of indoor air pollutants and the non-uniformity of indoor thermal and pollutant distributions. Subsequent energy performance analysis demonstrates that classroom energy demands for ventilation and cooling could be reduced with the promotion of heat recovery efficiency of the ventilation facility, and the energy conservation ratio of the air conditioning unit decreases with the increasing temperatures of supplying air. Fitting correlations of heat recovery ventilation and cooling energy conservation have been presented. - Highlights: • Low energy school buildings and classroom environment. • Heat recovery facility operating with an air conditioning unit. • Displacement ventilation influenced by the heat recovery efficiency. • Energy conservation of cooling and ventilation through heat recovery. • Enhancement of classroom environment with reduction of school building energy

  3. Rapid Wall-Breaching Kit, Ingress Hole Determination Experiment

    National Research Council Canada - National Science Library

    Turner, Daniel D; Carstens, Christian B; Redden, Elizabeth S; Whalen, Joseph B

    2003-01-01

    .... The experiment was conducted at McKenna Military Operations in Urban Terrain (MOUT) site Ft. Benning, Georgia. Soldiers from the Ranger Training Brigade and Headquarters Company 3/11th Infantry participated in the experiment...

  4. Life cycle primary energy analysis of residential buildings

    Energy Technology Data Exchange (ETDEWEB)

    Gustavsson, Leif; Joelsson, Anna [Ecotechnology, Department of Engineering and Sustainable Development, Mid Sweden University, SE-831 25 Oestersund (Sweden)

    2010-02-15

    The space heating demand of residential buildings can be decreased by improved insulation, reduced air leakage and by heat recovery from ventilation air. However, these measures result in an increased use of materials. As the energy for building operation decreases, the relative importance of the energy used in the production phase increases and influences optimization aimed at minimizing the life cycle energy use. The life cycle primary energy use of buildings also depends on the energy supply systems. In this work we analyse primary energy use and CO{sub 2} emission for the production and operation of conventional and low-energy residential buildings. Different types of energy supply systems are included in the analysis. We show that for a conventional and a low-energy building the primary energy use for production can be up to 45% and 60%, respectively, of the total, depending on the energy supply system, and with larger variations for conventional buildings. The primary energy used and the CO{sub 2} emission resulting from production are lower for wood-framed constructions than for concrete-framed constructions. The primary energy use and the CO{sub 2} emission depend strongly on the energy supply, for both conventional and low-energy buildings. For example, a single-family house from the 1970s heated with biomass-based district heating with cogeneration has 70% lower operational primary energy use than if heated with fuel-based electricity. The specific primary energy use with district heating was 40% lower than that of an electrically heated passive row house. (author)

  5. Schema building profiles among elementary school students in solving problems related to operations of addition to fractions on the basis of mathematic abilities

    Science.gov (United States)

    Gembong, S.; Suwarsono, S. T.; Prabowo

    2018-03-01

    Schema in the current study refers to a set of action, process, object and other schemas already possessed to build an individual’s ways of thinking to solve a given problem. The current study aims to investigate the schemas built among elementary school students in solving problems related to operations of addition to fractions. The analyses of the schema building were done qualitatively on the basis of the analytical framework of the APOS theory (Action, Process, Object, and Schema). Findings show that the schemas built on students of high and middle ability indicate the following. In the action stage, students were able to add two fractions by way of drawing a picture or procedural way. In the Stage of process, they could add two and three fractions. In the stage of object, they could explain the steps of adding two fractions and change a fraction into addition of fractions. In the last stage, schema, they could add fractions by relating them to another schema they have possessed i.e. the least common multiple. Those of high and middle mathematic abilities showed that their schema building in solving problems related to operations odd addition to fractions worked in line with the framework of the APOS theory. Those of low mathematic ability, however, showed that their schema on each stage did not work properly.

  6. HAM-Tools – a whole building simulation tool in Annex 41

    DEFF Research Database (Denmark)

    Kalagasidis, Angela Sasic; Rode, Carsten; Woloszyn, Monika

    2008-01-01

    HAM-Tools is a building simulation software. The main task of this tool is to simulate transfer processes related to building physics, i.e. heat, air and moisture transport in buildings and building components in operating conditions. The scope of the ECBCS Annex 41 “Whole Building Heat, Air...

  7. KEDUDUKAN PERJANJIAN BANGUN GUNA SERAH (BUILD OPERATE AND TRANSFER/BOT DALAM HUKUM TANAH NASIONAL

    Directory of Open Access Journals (Sweden)

    Anita Anita

    2017-12-01

    Full Text Available Indonesia is a state based on a rule of law the goal of which is to realize a just, prosperous, and materially and spiritually equal people. To realize the goal, progressively, sustainable national development has been conducted. The implementation of the development needs, besides from money, the availability of strategic land. To bridge the lack in both of them, BOT concept can be applied, as an agreement between the owner of land right and investor, where the former provides a feasibility study, building, and operation to the latter for a specified period of time, on the condition that when the BOT period of time has expired then the land together with the buildings and their appliances should be transferred to the former, so that both the owner of land right and the investors are mutually benefited. Keywords : National Development; Land; Capital; BOT   ABSTRAK Negara Indonesia merupakan negara hukum yang bertujuan untuk mewujudkan masyarakat adil dan makmur. Guna mewujudkan tujuan tersebut,  dilakukan pembangunan nasional secara bertahap dan berkelanjutan. Pelaksanaan pembangunan tersebut selain perlu didukung oleh dana juga ketersediaan lahan strategis. Keterbatasan keduanya dapat dilakukan melalui konsep BOT,  sebagai suatu perjanjian antara pemilik hak atas tanah dengan investor, dimana pemilik hak atas tanah menyerahkan studi kelayakan, pembangunan, pengoperasian kepada investor pada suatu jangka waktu tertentu, dengan ketentuan apabila masa BOT telah habis, tanah beserta bangunan, serta kelengkapan bangunan diserahkan kepada pemilik hak atas tanah, sehingga baik pemilik hak atas tanah maupun pihak investor yang mendanai pembangunan objek BOT memiliki keuntungan. Kata Kunci : Pembangunan Nasional; Tanah; Dana; BOT

  8. Optimizing Energy Consumption in Building Designs Using Building Information Model (BIM

    Directory of Open Access Journals (Sweden)

    Egwunatum Samuel

    2016-09-01

    Full Text Available Given the ability of a Building Information Model (BIM to serve as a multi-disciplinary data repository, this paper seeks to explore and exploit the sustainability value of Building Information Modelling/models in delivering buildings that require less energy for their operation, emit less CO2 and at the same time provide a comfortable living environment for their occupants. This objective was achieved by a critical and extensive review of the literature covering: (1 building energy consumption, (2 building energy performance and analysis, and (3 building information modeling and energy assessment. The literature cited in this paper showed that linking an energy analysis tool with a BIM model helped project design teams to predict and create optimized energy consumption. To validate this finding, an in-depth analysis was carried out on a completed BIM integrated construction project using the Arboleda Project in the Dominican Republic. The findings showed that the BIM-based energy analysis helped the design team achieve the world’s first 103% positive energy building. From the research findings, the paper concludes that linking an energy analysis tool with a BIM model helps to expedite the energy analysis process, provide more detailed and accurate results as well as deliver energy-efficient buildings. The study further recommends that the adoption of a level 2 BIM and the integration of BIM in energy optimization analyse should be made compulsory for all projects irrespective of the method of procurement (government-funded or otherwise or its size.

  9. When weather forecasts control the heating. Operational optimisation of administrative buildings with weather forecast control; Wenn Wetterprognosen die Heizung steuern. Betriebsoptimierung von Verwaltungsgebaeuden mit Wettervorhersage-Steuerung

    Energy Technology Data Exchange (ETDEWEB)

    Friedrich, Uwe

    2011-07-01

    With the aim of achieving an optimum indoor environment and lowering operating costs in the long term, the performance of a so-called ''operational optimisation with weather forecast control'' system has been tested in three administrative buildings in the German state of North Rhine-Westphalia since 2007. The operation of the heating systems is optimised based on a thermodynamic computer model and local weather forecast data. The result: A tangible increase in comfort with simultaneous heat energy savings. (orig.)

  10. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  11. Tender rules and trust influence on cooperation in the building industry

    DEFF Research Database (Denmark)

    Ussing, Lene Faber; Wandahl, Søren

    2012-01-01

    The building industry has for many years been criticized for not having as efficient and effective co-operation as other industries. Some parties in the building sector try to use a new form of collaboration as i.a. partnering. In a big part of those partnering projects a good working relationship...... exists, the building owner is satisfied, the involved companies earn money and the project finish in time. A lot of projects do not use partnering or other new forms of collaboration. In these projects the general impression is that the parties in the building sector are fighting instead of co......-operating. A questionnaire survey including building owners, contractors, suppliers, architects, engineers and client design advisor has been accomplished. The survey shows that the problem with co-operation among others is the way the tendering rules normally are used, where the normal assignment criterion is the lowest...

  12. Climate Responsive Buildings Concepts in Hong Kong

    DEFF Research Database (Denmark)

    Haase, M.; Amato, A.; van der Aa, A.

    2006-01-01

    There is a global need for a more sustainable building development. About 50% of energy is used in buildings indicating that buildings provide a considerable potential for operational energy savings. Studies were conducted with the following objectives: to perform a state-of-the-art review...... energy saving installations are increasingly applied as heat pumps in combination with energy storage, balanced ventilation with heat recovery, cooling towers etc. In Hong Kong in most cases there is no integrated design process for building projects. This means that projects are developed and designed...

  13. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  14. Establishment of experimental equipments in irradiation technology development building

    International Nuclear Information System (INIS)

    Ishida, Takuya; Tanimoto, Masataka; Shibata, Akira; Kitagishi, Shigeru; Saito, Takashi; Ohmi, Masao; Nakamura, Jinichi; Tsuchiya, Kunihiko

    2011-06-01

    The Neutron Irradiation and Testing Reactor Center has developed new irradiation technologies to provide irradiation data with high technical value for the resume of the Japan Materials Testing Reactor (JMTR). For the purpose to perform assembling of capsules, materials tests, materials inspection and analysis of irradiation specimens for the development of irradiation capsules, improvement and maintenance of facilities were performed. From the viewpoint of effective use of existing buildings in the Oarai research and development center, the RI application development building was refurbished and maintained for above-mentioned purpose. The RI application development building is a released controlled area, and was used as storage of experimental equipments and stationeries. The building was named 'Irradiation Technology Development Building' after it refurbished and maintained. Eight laboratories were maintained based on the purpose of use, and the installation of the experimental apparatuses was started. A basic management procedure of the Irradiation Technology Development Building was established and has been operated. This report describes the refurbish work of the RI application development building, the installation and operation method of the experimental apparatuses and the basic management procedure of the Irradiation Technology Development Building. (author)

  15. Successful Strategies for Planning a Green Building.

    Science.gov (United States)

    Browning, William D.

    2003-01-01

    Presents several strategies for successful green building on campus: develop a set of clear environmental performance goals (buildings as pedagogical tools, climate-neutral operations, maximized human performance), use Leadership in Energy and Environmental Design (LEED) as a gauge of performance, and use the project to reform the campus building…

  16. Monitoring-based HVAC commissioning of an existing office building for energy efficiency

    International Nuclear Information System (INIS)

    Wang, Liping; Greenberg, Steve; Fiegel, John; Rubalcava, Alma; Earni, Shankar; Pang, Xiufeng; Yin, Rongxin; Woodworth, Spencer; Hernandez-Maldonado, Jorge

    2013-01-01

    Highlights: ► Demonstrated monitoring-based HVAC commissioning using an existing office building. ► Diagnosed various types of faulty operation in the HVAC system by trend data analyses. ► Identified a list of energy saving measures for the HVAC system. ► Quantified energy saving potential for each commissioning measure using calibrated energy simulation model. ► Achieved an actual energy saving of 10% after the implementations of cost-effective measures. -- Abstract: The performance of Heating, Ventilation and Air Conditioning (HVAC) systems may fail to satisfy design expectations due to improper equipment installation, equipment degradation, sensor failures, or incorrect control sequences. Commissioning identifies and implements cost-effective operational and maintenance measures in buildings to bring them up to the design intent or optimum operation. An existing office building is used as a case study to demonstrate the process of commissioning. Building energy benchmarking tools are applied to evaluate the energy performance for screening opportunities at the whole building level. A large natural gas saving potential was indicated by the building benchmarking results. Faulty operations in the HVAC systems, such as improper operations of air-side economizers, simultaneous heating and cooling, and ineffective optimal start, were identified through trend data analyses and functional testing. The energy saving potential for each commissioning measure is quantified with a calibrated building simulation model. An actual energy saving of 10% was realized after the implementations of cost-effective measures.

  17. Reviewing the Role of Stakeholders in Operational Research: Opportunities for Group Model Building

    NARCIS (Netherlands)

    Gooyert, V. de; Rouwette, E.A.J.A.; Kranenburg, H.L. van

    2013-01-01

    Stakeholders have always received much attention in system dynamics, especially in the group model building tradition, which emphasizes the deep involvement of a client group in building a system dynamics model. In organizations, stakeholders are gaining more and more attention by managers who try

  18. Water sustainable management for buildings Water sustainable management for buildings

    Directory of Open Access Journals (Sweden)

    Juan Arturo Ocaña Ponce

    2013-01-01

    Full Text Available This paper presents a literature review article that deals with how to manage water in build­ings, specifically in facility projects, in ways to save water during the use, maintenance and operation of the building. This work is aimed at architects, builders and developers, and may be helpful for decision-making in the planning and management of efficient water use in buildings.Este trabajo es un artículo de revisión relacionado con el manejo y gestión del recurso agua, particularmente en proyectos de edificaciones, con el fin de propiciar ahorro de agua durante el uso, mantenimiento y operación del inmueble. Este documento está dirigido a arquitectos, constructores y desarrolladores inmobiliarios y puede ser de gran utilidad para la toma de decisiones en la fase de planeación y de gestión del uso eficiente del agua en los edificios.

  19. 324 Building special-case waste assessment in support of the 324 Building closure (TPA milestone M-89-05)

    International Nuclear Information System (INIS)

    Hobart, R.L.

    1998-01-01

    Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05 requires US Department of Energy, Richland Operations Office to complete a 324 Building Special Case Waste Assessment in Support of the 324 Building Closure. This document has been prepared with the intent of meeting this regulatory commitment. Alternatives for the Special Case Wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel

  20. A Low-energy Building under Arctic Conditions - Experiences After Five Years of Operation

    DEFF Research Database (Denmark)

    Rode, Carsten; Vladyková, Petra; Kotol, Martin

    2011-01-01

    In 2005, a low energy house was inaugurated in Sisimiut, Greenland. The house and the plans with it were presented at the third International Building Physics Conference in 2006. The house is characterised by having a highly insulated building envelope which is almost free of thermal bridges, adv...

  1. New building technology based on low energy design

    International Nuclear Information System (INIS)

    Meggers, Forrest; Leibundgut, Hansjurg

    2009-01-01

    Full text: The construction, operation and maintenance of all residential, commercial, and industrial buildings are responsible for over half of global greenhouse gas emissions, and two-thirds of global electricity is generated solely for building operation. This single sector has a huge potential impact on the future sustainability of society, and therefore new advanced technologies must be rapidly developed and implemented in what is often a slow-moving sector. The concept of the low exergy building has created a new framework for the development of high performance building systems. Exergy analysis has been used to help minimize the primary energy demands of buildings through the minimization of losses in the chain of energy supply in a building system. The new systems that have been created have been shown to be more comfortable and more energy efficient. These systems include integrated thermal mass systems heated by high efficiency heat pumps integrated with energy recovery systems that eliminate the waste that is common in building systems. The underlying principles and concepts of low exergy building systems will be presented along with the analysis of several technologies being implemented in a low Ex building in Zurich, Switzerland. These include an advanced ground source heat pump strategy with integrated heat recovery, decentralized ventilation, and a unique active wall insulation system, which are being researched as part of the IEA ECBCS Annex 49 (www.annex49.org). (author)

  2. A Facilities Manager's Guide to Green Building Design.

    Science.gov (United States)

    Simpson, Walter

    2001-01-01

    Explains how the "green building" approach to educational facilities design creates healthy, naturally lit, attractive buildings with lower operating and life cycle costs. Tips on getting started on a green design and overcoming the barriers to the green design concept are discussed. (GR)

  3. Energy balance framework for Net Zero Energy buildings

    Science.gov (United States)

    Approaching a Net Zero Energy (NZE) building goal based on current definitions is flawed for two principal reasons - they only deal with energy quantities required for operations, and they do not establish a threshold, which ensures that buildings are optimized for reduced consum...

  4. Integrated Design and Approach of Building Maintenance Management in the Built Environment

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2017-12-01

    Full Text Available Building maintenance is such a crucial aspect in the construction industry. The construction industry is characterized as a project-based industry that delivers one of a kind products and services. Thus, building maintenance can guarantee the safety of buildings including human health and property. To some extent, it plays as a guard to supervise the buildings protecting them being suffered collapse and deterioration. The most importantly, preparing for maintenance carried out on buildings is complex and it is related to procurement system dramatically, such as design-and-build, design-build-finance operate, and the private finance initiative and public/private partnerships, all of them need to give much consideration of operational and maintenance needs and costs which are ongoing.. This paper will focus on design and approach of building maintenance management in the construction industry.

  5. Building a Circular Future

    DEFF Research Database (Denmark)

    Merrild, Heidi

    2016-01-01

    Natural resources are scarce and construction accounts for 40 percent of the material and energy consumption in Europe. This means that a switch to a circular future is necessary. ’Building a Circular Future’ maps out where we are, where we are going, and what is needed for this conversion to take...... on the project’s strategies. The financial result is a profit of DKK 35 million on the structure alone in the demolition of a building built for the cost of DKK 860 million. The total potential for the whole building, calculated in projected material prices, is estimated to be up to 16% of the total construction...... of the circular strategies is not only in the future. Increased flexibility, optimized operation and maintenance, as well as a healthier building, is low-hanging fruit that can be harvested today. The project’s principles can be implemented in industrialized construction in a large scale today. That is proven...

  6. Type B accident investigation board report of the July 2, 1997 curium intake by shredder operator at Building 513 Lawrence Livermore National Laboratory, Livermore, California. Final report

    International Nuclear Information System (INIS)

    1997-08-01

    On July 2, 1997 at approximately 6:00 A.M., two operators (Workers 1 and 2), wearing approved personal protective equipment (PPE), began a shredding operation of HEPA filters for volume reduction in Building 513 (B-513) at Lawrence Livermore National Laboratory (LLNL). The waste requisitions indicated they were shredding filters containing ≤ 1 μCi of americium-241 (Am-241). A third operator (Worker 3) provided support to the shredder operators in the shredding area (hot area) from a room that was adjacent to the shredding area (cold area). At Approximately 8:00 A.M., a fourth operator (Worker 4) relieved Worker 2 in the shredding operation. Sometime between 8:30 A.M. and 9:00 A.M., Worker 3 left the cold area to make a phone call and set off a hand and foot counter in Building 514. Upon discovering the contamination, the shredding operation was stopped and surveys were conducted in the shredder area. Surveys conducted on the workers found significant levels of contamination on their PPE and the exterior of their respirator cartridges. An exit survey of Worker 1 was conducted at approximately 10:05 A.M., and found contamination on his PPE, as well as on the exterior and interior of his respirator. Contamination was also found on his face, chest, back of neck, hair, knees, and mustache. A nose blow indicated significant contamination, which was later determined to be curium-244

  7. The energetic concept in the administration building of the Federal Environmental Agency in Dessau. Technical innovation for a sustainable operation; Das energetische Konzept im Dienstgebaeude des Umweltbundesamtes in Dessau. Technische Innovationen fuer einen nachhaltigen Betrieb

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-01

    The new office building of the Federal Environmental Agency (Dessau-Rosslau, Federal Republic of Germany) was implemented as a pilot project for environmentally sustainable construction with high-energy targets. In order to reduce the consumption of fossil fuels significantly, the building should have a very low power consumption and enable a sustainable operation. A mostly compact form of the building and a highly insulated building envelope are a first prerequisite.

  8. Building America House Simulation Protocols (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    Hendron, R.; Engebrecht, C.

    2010-10-01

    The House Simulation Protocol document was developed to track and manage progress toward Building America's multi-year, average whole-building energy reduction research goals for new construction and existing homes, using a consistent analytical reference point. This report summarizes the guidelines for developing and reporting these analytical results in a consistent and meaningful manner for all home energy uses using standard operating conditions.

  9. Evaluating the Cost of Line Capacity Limitations in Aggregations of Commercial Buildings

    DEFF Research Database (Denmark)

    Ziras, Charalampos; Delikaraoglou, Stefanos; Kazempour, Jalal

    2017-01-01

    -ahead optimization strategy to assess the cost of imposing capacity limitations in the total consumption of individual buildings, as well as aggregations of buildings. We show that such capacity limitations lead to an increase for the buildings operational costs, which can be interpreted as the value...... of these limitations. Based on such calculations, the aggregator can value capacity-limitation services to the distribution system operator. Moreover, the value of aggregation is also highlighted, since it leads to lower costs than imposing the same total capacity limitation on individual buildings....

  10. Managers’ perspectives: practical experience and challenges associated with variable-density operations and uneven-aged management

    Science.gov (United States)

    Kurtis E. Steele

    2013-01-01

    Variable-density thinning has received a lot of public attention in recent years and has subsequently become standard language in most of the Willamette National Forest’s timber management projects. Many techniques have been tried, with varying on-the-ground successes. To accomplish variable-density thinning, the McKenzie River Ranger District currently uses...

  11. Operation of TUT Solar PV Power Station Research Plant under Partial Shading Caused by Snow and Buildings

    Directory of Open Access Journals (Sweden)

    Diego Torres Lobera

    2013-01-01

    Full Text Available A grid connected solar photovoltaic (PV research facility equipped with comprehensive climatic and electric measuring systems has been designed and built in the Department of Electrical Engineering of the Tampere University of Technology (TUT. The climatic measuring system is composed of an accurate weather station, solar radiation measurements, and a mesh of irradiance and PV module temperature measurements located throughout the solar PV facility. Furthermore, electrical measurements can be taken from single PV modules and strings of modules synchronized with the climatic data. All measured parameters are sampled continuously at 10 Hz with a data-acquisition system based on swappable I/O card technology and stored in a database for later analysis. The used sampling frequency was defined by thorough analyses of the PV system time dependence. Climatic and electrical measurements of the first operation year of the research facility are analyzed in this paper. Moreover, operation of PV systems under partial shading conditions caused by snow and building structures is studied by means of the measured current and power characteristics of PV modules and strings.

  12. Operating System Security

    CERN Document Server

    Jaeger, Trent

    2008-01-01

    Operating systems provide the fundamental mechanisms for securing computer processing. Since the 1960s, operating systems designers have explored how to build "secure" operating systems - operating systems whose mechanisms protect the system against a motivated adversary. Recently, the importance of ensuring such security has become a mainstream issue for all operating systems. In this book, we examine past research that outlines the requirements for a secure operating system and research that implements example systems that aim for such requirements. For system designs that aimed to

  13. Brick : Metadata Schema for Portable Smart Building Applications

    DEFF Research Database (Denmark)

    Balaji, Bharathan; Bhattacharya, Arka; Fierro, Gabe

    2018-01-01

    Buildings account for 32% of the energy use worldwide. A new regime of exciting new “applications” that span a distributed fabric of sensors, actuators and humans have emerged to improve building energy efficiency and operations management. These applications leverage the technological advances i...

  14. Solar Heating and Cooling of Residential Buildings: Sizing, Installation and Operation of Systems.

    Science.gov (United States)

    Colorado State Univ., Ft. Collins. Solar Energy Applications Lab.

    This training course and a companion course titled "Design of Systems for Solar Heating and Cooling of Residential Buildings," are designed to train home designers and builders in the fundamentals of solar hydronic and air systems for space heating and cooling and domestic hot water heating for residential buildings. Each course, organized in 22…

  15. Deactivation of Building 7602

    International Nuclear Information System (INIS)

    Yook, H.R.; Barnett, J.R.; Collins, T.L.

    1995-10-01

    The Department of Energy (DOE) has sponsored research and development programs in Building 7602 at Oak Ridge National Laboratory (ORNL) since 1984. This work focused on development of advanced technology for processing nuclear fuels. Building 7602 was used for engineering-scale tests using depleted and natural uranium to simulate the nuclear fuel. In April 1994 the DOE Office of Nuclear Energy (NE) sent supplemental FY 1994 guidance to ORNL stating that in FY 1995 and beyond, Building 7602 is considered surplus to NE programs and missions and shall be shut down (deactivated) and maintained in a radiologically and industrially safe condition with minimal surveillance and maintenance (S ampersand M). DOE-NE subsequently provided FY 1995 funding to support the deactivation activities. Deactivation of Building 7602 was initiated on October 1, 1994. The principal activity during the first quarter of FY 1995 was removal of process materials (chemicals and uranium) from the systems. The process systems were operated to achieve chemical solution concentrations needed for reuse or disposal of the solutions prior to removal of the materials from the systems. During this phase of deactivation the process materials processed and removed were: (1) Uranyl nitrate solution 30,178 L containing 4490 kg of uranium; (2) Nitric acid (neutralized) 9850 L containing less than 0.013 kg of uranium; (3) Organic solution 3346 L containing 265 kg of uranium; (4) Uranium oxide powder 95 kg; and (5) Miscellaneous chemicals. At the end of December 1994, the process systems and control systems were shut down and deactivated. Disposition of the process materials removed from the process systems in Building 7602 proved to be the most difficult part of the deactivation. An operational stand down and funding reductions at Y-12 prevented planned conversion of the uranyl nitrate solution to depleted uranium oxide powder. This led to disposal of the uranyl nitrate solution as waste

  16. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  17. Wood Pellet-Fired Biomass Boiler Project at the Ketchikan Federal Building

    Energy Technology Data Exchange (ETDEWEB)

    Tomberlin, Gregg [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2014-06-01

    Biomass boiler systems have existed for many years, but the technology has advanced in recent decades and can now provide automated and efficient operation for a relatively modest investment. Key advances in system monitoring and control allow for lower operating costs, since the control systems run all aspects of the boiler, including feed, load reduction and even tube cleaning. These advances have made such systems economical on a small scale in situations where inexpensive fuels like natural gas are not available. This creates an opportunity for building operators in remote, cold-climate locations to reduce the use of expensive fuels for heating buildings. GSA Region 10 installed the system at the federal building in Ketchikan, Alaska and submitted the project to the Green Proving Ground (GPG) program. GSA's GPG program contracted with the National Renewable Energy Laboratory (NREL) to assess the installation and the technology. The system serves as a demonstration to assess actual system efficiencies, as well as operating characteristics and financial benefits. In addition to installation and operational issues, the project team/researchers examined other issues, including fuel transportation costs, building energy savings, and overall economics.

  18. Retail Building Guide for Entrance Energy Efficiency Measures

    Energy Technology Data Exchange (ETDEWEB)

    Stein, J.; Kung, F.

    2012-03-01

    This booklet is based on the findings of an infiltration analysis for supermarkets and large retail buildings without refrigerated cases. It enables retail building managers and engineers to calculate the energy savings potential for vestibule additions for supermarkets; and bay door operation changes in large retail stores without refrigerated cases. Retail managers can use initial estimates to decide whether to engage vendors or contractors of vestibules for pricing or site-specific analyses, or to decide whether to test bay door operation changes in pilot stores, respectively.

  19. Numerical simulation of energy efficiency measures: control and operational strategies

    International Nuclear Information System (INIS)

    Ardehali, M. M.

    2006-01-01

    The inherent limitation in performance of building envelop components and heating ventilating and air conditioning (HVAC) equipment necessitates the examination of operational strategies for improvement in energy-efficient operation of buildings. Due to the ease of installation and increasing availability of electronic controllers, operational strategies that could be programmed are of particular interest. The Iowa Energy Center in the US has taken the initiative to conduct the necessary assessment of current HVAC technology and the commonly-used operational strategies for commercial and industrial buildings, as applied to the midwestern part of the country, with weather and energy cost data for Des Moines, Iowa. The first part of this study focused on the energy consumption and cost effectiveness of HVAC systems. The objectives of the second part is concerned with examination of various operational strategies, namely, night purge (NP), fan optimum start and stop (OSS), condenser water reset (CWR), and chilled water reset (CHWR) applied to order and newer-type commercial office buildings. The indoor air quality requirement are met and the latest applicable energy rates from local utility companies are used. The results show that, in general, NP is not an effective strategy in buildings with low thermal mass storage, OSS reduced fan energy, and CWR and CHWR could be effective and require chillers with multi-stage unloading characteristics. The most operationally efficient strategies are the combination of OSS, CWR, and CHWR for the older-type building, and OSS for the newer-type building. Economically, the most effective is the OSS strategy for the older-type building and the CHWR strategy for the newer-type building.(Author)

  20. Functional materials for energy-efficient buildings

    Directory of Open Access Journals (Sweden)

    Ebert H.-P

    2015-01-01

    Full Text Available The substantial improving of the energy efficiency is essential to meet the ambitious energy goals of the EU. About 40% of the European energy consumption belongs to the building sector. Therefore the reduction of the energy demand of the existing building stock is one of the key measures to deliver a substantial contribution to reduce CO2-emissions of our society. Buildings of the future have to be efficient in respect to energy consumption for construction and operation. Current research activities are focused on the development of functional materials with outstanding thermal and optical properties to provide, for example, slim thermally superinsulated facades, highly integrated heat storage systems or adaptive building components. In this context it is important to consider buildings as entities which fulfill energy and comfort claims as well as aesthetic aspects of a sustainable architecture.

  1. Functional materials for energy-efficient buildings

    Science.gov (United States)

    Ebert, H.-P.

    2015-08-01

    The substantial improving of the energy efficiency is essential to meet the ambitious energy goals of the EU. About 40% of the European energy consumption belongs to the building sector. Therefore the reduction of the energy demand of the existing building stock is one of the key measures to deliver a substantial contribution to reduce CO2-emissions of our society. Buildings of the future have to be efficient in respect to energy consumption for construction and operation. Current research activities are focused on the development of functional materials with outstanding thermal and optical properties to provide, for example, slim thermally superinsulated facades, highly integrated heat storage systems or adaptive building components. In this context it is important to consider buildings as entities which fulfill energy and comfort claims as well as aesthetic aspects of a sustainable architecture.

  2. WASTE HANDLING BUILDING FIRE PROTECTION SYSTEM DESCRIPTION DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    J. D. Bigbee

    2000-06-21

    The Waste Handling Building Fire Protection System provides the capability to detect, control, and extinguish fires and/or mitigate explosions throughout the Waste Handling Building (WHB). Fire protection includes appropriate water-based and non-water-based suppression, as appropriate, and includes the distribution and delivery systems for the fire suppression agents. The Waste Handling Building Fire Protection System includes fire or explosion detection panel(s) controlling various detectors, system actuation, annunciators, equipment controls, and signal outputs. The system interfaces with the Waste Handling Building System for mounting of fire protection equipment and components, location of fire suppression equipment, suppression agent runoff, and locating fire rated barriers. The system interfaces with the Waste Handling Building System for adequate drainage and removal capabilities of liquid runoff resulting from fire protection discharges. The system interfaces with the Waste Handling Building Electrical Distribution System for power to operate, and with the Site Fire Protection System for fire protection water supply to automatic sprinklers, standpipes, and hose stations. The system interfaces with the Site Fire Protection System for fire signal transmission outside the WHB as needed to respond to a fire emergency, and with the Waste Handling Building Ventilation System to detect smoke and fire in specific areas, to protect building high-efficiency particulate air (HEPA) filters, and to control portions of the Waste Handling Building Ventilation System for smoke management and manual override capability. The system interfaces with the Monitored Geologic Repository (MGR) Operations Monitoring and Control System for annunciation, and condition status.

  3. WASTE HANDLING BUILDING FIRE PROTECTION SYSTEM DESCRIPTION DOCUMENT

    International Nuclear Information System (INIS)

    J. D. Bigbee

    2000-01-01

    The Waste Handling Building Fire Protection System provides the capability to detect, control, and extinguish fires and/or mitigate explosions throughout the Waste Handling Building (WHB). Fire protection includes appropriate water-based and non-water-based suppression, as appropriate, and includes the distribution and delivery systems for the fire suppression agents. The Waste Handling Building Fire Protection System includes fire or explosion detection panel(s) controlling various detectors, system actuation, annunciators, equipment controls, and signal outputs. The system interfaces with the Waste Handling Building System for mounting of fire protection equipment and components, location of fire suppression equipment, suppression agent runoff, and locating fire rated barriers. The system interfaces with the Waste Handling Building System for adequate drainage and removal capabilities of liquid runoff resulting from fire protection discharges. The system interfaces with the Waste Handling Building Electrical Distribution System for power to operate, and with the Site Fire Protection System for fire protection water supply to automatic sprinklers, standpipes, and hose stations. The system interfaces with the Site Fire Protection System for fire signal transmission outside the WHB as needed to respond to a fire emergency, and with the Waste Handling Building Ventilation System to detect smoke and fire in specific areas, to protect building high-efficiency particulate air (HEPA) filters, and to control portions of the Waste Handling Building Ventilation System for smoke management and manual override capability. The system interfaces with the Monitored Geologic Repository (MGR) Operations Monitoring and Control System for annunciation, and condition status

  4. Potential Operating Orbits for the SAFE-400

    International Nuclear Information System (INIS)

    Houts, Mike; Kos, Larry; Poston, David

    2002-01-01

    Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp > 3000 s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into nonradioactive isotopes. Operational constraints required to ensure safety can thus be quantified. (authors)

  5. Intelligent Controls for Net-Zero Energy Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Li, Haorong; Cho, Yong; Peng, Dongming

    2011-10-30

    The goal of this project is to develop and demonstrate enabling technologies that can empower homeowners to convert their homes into net-zero energy buildings in a cost-effective manner. The project objectives and expected outcomes are as follows: • To develop rapid and scalable building information collection and modeling technologies that can obtain and process “as-built” building information in an automated or semiautomated manner. • To identify low-cost measurements and develop low-cost virtual sensors that can monitor building operations in a plug-n-play and low-cost manner. • To integrate and demonstrate low-cost building information modeling (BIM) technologies. • To develop decision support tools which can empower building owners to perform energy auditing and retrofit analysis. • To develop and demonstrate low-cost automated diagnostics and optimal control technologies which can improve building energy efficiency in a continual manner.

  6. Better building of valley fills

    Energy Technology Data Exchange (ETDEWEB)

    Chironis, N.P.

    1980-03-01

    Current US regulations for building valley fills or head of hollow fills to hold excess spoil resulting from contour mining are meeting with considerable opposition, particularly from operators in steep-slope areas. An alternative method has been submitted to the Office of Surface Mining by Virgina. Known as the zoned concept method, it has already been used successfully in building water-holding dams and coal refuse embankments on sloping terrain. The ways in which drainage and seepage are managed are described.

  7. Evaluating hospital design from an operations management perspective.

    Science.gov (United States)

    Vos, Leti; Groothuis, Siebren; van Merode, Godefridus G

    2007-12-01

    This paper describes an evaluation method for the assessment of hospital building design from the viewpoint of operations management to assure that the building design supports the efficient and effective operating of care processes now and in the future. The different steps of the method are illustrated by a case study. In the case study an experimental design is applied to assess the effect of used logistical concepts, patient mix and technologies. The study shows that the evaluation method provides a valuable tool for the assessment of both functionality and the ability to meet future developments in operational control of a building design.

  8. On the complexity of smart buildings occupant behavior

    DEFF Research Database (Denmark)

    Lazarova-Molnar, Sanja; Mohamed, Nader

    2017-01-01

    Smart buildings are run by Cyber-Physical Systems (CPS), termed as Building Management Systems (BMS). Typical goals for the operation of BMS are increasing occupant comfort and decreasing buildings energy consumption. The central and critical figure, however, for achieving both goals are buildings......' occupants. In some BMS, occupants have a high level of interaction with the system, whereas in others this is limited to a large extent, barring occupants from even opening windows. Every interaction, however, is a form of feedback, which in some cases poses a risk, whereas in others, it is an opportunity...

  9. Conduct of operations training - An innovative approach to team building

    International Nuclear Information System (INIS)

    Widen, W.C.; Kurth, W.; Broccolo, A.

    1987-01-01

    The conduct of nuclear power plant operations is a key parameter for station management and regulators alike. Indeed, the basic methods and demeanor in which operating crews approach overall plant operations is perhaps the principal factor leading to safe and efficient operations. Hence, Commonwealth Edison's Zion Station has initiated an innovative and positive training program designed to increase operator awareness of conducting station operations in an attentive, diligent, and conscientious manner. This Conduct of Operations Training Program is a collaborative joint effort between Commonwealth Edison and the Westinghouse Nuclear Training Center. In particular, the key managers of Zion's operating department brainstormed various philosophies and strategies with senior training staff members of the Westinghouse Nuclear Training Center. The outcome of these sessions has formed the skeleton of an intensified, one-day Conduct of Operations course. Several unique aspects of this innovative course are described

  10. VARIANT FOR CONSTRUCTION, REPAIR OR RECONSTRUCTION OF BUILDING

    Directory of Open Access Journals (Sweden)

    S. N. Osipov

    2016-01-01

    Full Text Available In the XXI century moral depreciation concept comprises not only deterioration of outside appearance of construction elements in the course of time but accelerated fashion changes in respect of interior design and rapid increase in technical level for residence buildings. For this reason if average rate of building dilapidation in the buildings of series 1–335, 1–335А and 1–464А constructed in Minsk within the period of 1957–1975 and being operated till 2005–2006 has constituted 25–29 % and their moral depreciation has been equal to more than 40 % then rate of the moral depreciation has significantly increased in the XXI century. Such situation requires execution of special investigations. High operating rates of refinancing have led to the necessity for record keeping of initial expenses and repairability levels because selection of building construction, repair or reconstruction variant depends on these parameters. Repairability classification of main elements of residence buildings and premises has been proposed for regulation of such selection procedure. In this case it is recommended to take into account technological effectiveness of repair and technical service, verifiability, accessibility, easy dismountability, substitutability and interchangeability of construction elements and technical devices. The paper presents nomograms that permit to make easier practical calculations on determination of cost-efficient time period for operation of the element prior to its substitution at various refinancing rates and also for comparison of relative initial expenses according to time service. 

  11. Tokamak building-design considerations for a large tokamak device

    International Nuclear Information System (INIS)

    Barrett, R.J.; Thomson, S.L.

    1981-01-01

    Design and construction of a satisfactory tokamak building to support FED appears feasible. Further, a pressure vessel building does not appear necessary to meet the plant safety requirements. Some of the building functions will require safety class systems to assure reliable and safe operation. A rectangular tokamak building has been selected for FED preconceptual design which will be part of the confinement system relying on ventilation and other design features to reduce the consequences and probability of radioactivity release

  12. Energy optimization methodology of multi-chiller plant in commercial buildings

    International Nuclear Information System (INIS)

    Thangavelu, Sundar Raj; Myat, Aung; Khambadkone, Ashwin

    2017-01-01

    This study investigates the potential energy savings in commercial buildings through optimized operation of a multi-chiller plant. The cooling load contributes 45–60% of total power consumption in commercial and office buildings, especially at tropics. The chiller plant operation is not optimal in most of the existing buildings because the chiller plant is either operated at design condition irrespective of the cooling load or optimized locally due to lack of overall chiller plant behavior. In this study, an overall energy model of chiller plant is developed to capture the thermal behavior of all systems and their interactions including the power consumption. An energy optimization methodology is proposed to derive optimized operation decisions for chiller plant at regular intervals based on building thermal load and weather condition. The benefits of proposed energy optimization methodology are examined using case study problems covering different chiller plant configurations. The case studies result confirmed the energy savings achieved through optimized operations is up to 40% for moderate size chiller plant and around 20% for small chiller plant which consequently reduces the energy cost and greenhouse gas emissions. - Highlights: • Energy optimization methodology improves the performance of multi-chiller plant. • Overall energy model of chiller plant accounts all equipment and the interactions. • Operation decisions are derived at regular interval based on time-varying factors. • Three case studies confirmed 20 to 40% of energy savings than conventional method.

  13. Enabling VOLTTRON: Energy Management of Commercial Buildings at the University of Maryland

    Science.gov (United States)

    Ebhojiaye, Itohan Omisi

    Buildings waste approximately 30% of energy they consume due to inefficient HVAC and lighting operation. Building Automation Systems (BAS) can aid in reducing such wasted energy, but 90% of U.S. commercial buildings lack a BAS due to their high capital costs. This thesis demonstrates how VOLTTRON, an open source operating system developed by Pacific Northwest National Laboratory, was used to disable the mechanical cooling of a rooftop unit (RTU) during unoccupied hours, on a building without a BAS. With cooling off, the RTU's electricity dropped from 18 kW to 7kW. These results indicate 450 to 550 can be saved on the monthly electric bill of the building during the summer, compared to when the RTU operated in cooling mode continuously. The installation cost of the equipment that enabled the RTU to be controlled via VOLTTRON was $6,400, thus the project has a payback period of 13 months.

  14. Reinforcement learning for optimal control of low exergy buildings

    International Nuclear Information System (INIS)

    Yang, Lei; Nagy, Zoltan; Goffin, Philippe; Schlueter, Arno

    2015-01-01

    Highlights: • Implementation of reinforcement learning control for LowEx Building systems. • Learning allows adaptation to local environment without prior knowledge. • Presentation of reinforcement learning control for real-life applications. • Discussion of the applicability for real-life situations. - Abstract: Over a third of the anthropogenic greenhouse gas (GHG) emissions stem from cooling and heating buildings, due to their fossil fuel based operation. Low exergy building systems are a promising approach to reduce energy consumption as well as GHG emissions. They consists of renewable energy technologies, such as PV, PV/T and heat pumps. Since careful tuning of parameters is required, a manual setup may result in sub-optimal operation. A model predictive control approach is unnecessarily complex due to the required model identification. Therefore, in this work we present a reinforcement learning control (RLC) approach. The studied building consists of a PV/T array for solar heat and electricity generation, as well as geothermal heat pumps. We present RLC for the PV/T array, and the full building model. Two methods, Tabular Q-learning and Batch Q-learning with Memory Replay, are implemented with real building settings and actual weather conditions in a Matlab/Simulink framework. The performance is evaluated against standard rule-based control (RBC). We investigated different neural network structures and find that some outperformed RBC already during the learning phase. Overall, every RLC strategy for PV/T outperformed RBC by over 10% after the third year. Likewise, for the full building, RLC outperforms RBC in terms of meeting the heating demand, maintaining the optimal operation temperature and compensating more effectively for ground heat. This allows to reduce engineering costs associated with the setup of these systems, as well as decrease the return-of-invest period, both of which are necessary to create a sustainable, zero-emission building

  15. Team building: conceptual, methodological, and applied considerations.

    Science.gov (United States)

    Beauchamp, Mark R; McEwan, Desmond; Waldhauser, Katrina J

    2017-08-01

    Team building has been identified as an important method of improving the psychological climate in which teams operate, as well as overall team functioning. Within the context of sports, team building interventions have consistently been found to result in improvements in team effectiveness. In this paper we review the extant literature on team building in sport, and address a range of conceptual, methodological, and applied considerations that have the potential to advance theory, research, and applied intervention initiatives within the field. This involves expanding the scope of team building strategies that have, to date, primarily focused on developing group cohesion. Copyright © 2017 Elsevier Ltd. All rights reserved.

  16. Temporal knowledge discovery in big BAS data for building energy management

    DEFF Research Database (Denmark)

    Fan, Cheng; Xiao, Fu; Madsen, Henrik

    2015-01-01

    With the advances of information technologies, today's building automation systems (BASs) are capable of managing building operational performance in an efficient and convenient way. Meanwhile, the amount of real-time monitoring and control data in BASs grows continually in the building lifecycle...

  17. Development of long operating cycle simplified BWR

    International Nuclear Information System (INIS)

    Heki, H.; Nakamaru, M.; Maruya, T.; Hiraiwa, K.; Arai, K.; Narabayash, T.; Aritomi, M.

    2002-01-01

    This paper describes an innovative plant concept for long operating cycle simplified BWR (LSBWR) In this plant concept, 1) Long operating cycle ( 3 to 15 years), 2) Simplified systems and building, 3) Factory fabrication in module are discussed. Designing long operating core is based on medium enriched U-235 with burnable poison. Simplified systems and building are realized by using natural circulation with bottom located core, internal CRD and PCV with passive system and an integrated reactor and turbine building. This LSBWR concept will have make high degree of safety by IVR (In Vessel Retention) capability, large water inventory above the core region and no PCV vent to the environment due to PCCS (Passive Containment Cooling System) and internal vent tank. Integrated building concept could realize highly modular arrangement in hull structure (ship frame structure), ease of seismic isolation capability and high applicability of standardization and factory fabrication. (authors)

  18. Contribution Index Based on Green Building Certification Systems

    OpenAIRE

    Yuting Sun; Bee Hua Goh

    2015-01-01

    Green Building Certification Systems (GBCS) are carried out in many countries due to the rising awareness of the importance of sustainability in the building industry. The intention should have motivated participants to construct and operate buildings sustainably, however, there is not yet a method developed to investigate the motivation of the participants. Based on the GBCS, this paper proposes the contribution index as a standard global method to analyze the performance of participants in ...

  19. Development of Automated Procedures to Generate Reference Building Models for ASHRAE Standard 90.1 and India’s Building Energy Code and Implementation in OpenStudio

    Energy Technology Data Exchange (ETDEWEB)

    Parker, Andrew [National Renewable Energy Lab. (NREL), Golden, CO (United States); Haves, Philip [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Jegi, Subhash [International Institute of Information Technology, Hyderabad (India); Garg, Vishal [International Institute of Information Technology, Hyderabad (India); Ravache, Baptiste [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-09-14

    This paper describes a software system for automatically generating a reference (baseline) building energy model from the proposed (as-designed) building energy model. This system is built using the OpenStudio Software Development Kit (SDK) and is designed to operate on building energy models in the OpenStudio file format.

  20. Commercial Building Energy Asset Score Program Overview and Technical Protocol (Version 1.1)

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Na; Goel, Supriya; Makhmalbaf, Atefe

    2013-08-09

    The U.S. Department of Energy (DOE) is developing a voluntary national scoring system for commercial buildings to help building owners and managers assess a building’s energy-related systems independent of operations. The goal of the score is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system, known as the Commercial Building Energy Asset Score, will allow building owners and managers to compare their building infrastructure against peers and track building upgrades over time. The system will also help other building stakeholders (e.g., building investors, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset scoring tool. The alternative methods that were considered prior to developing the current approach are described in the Program Overview and Technical Protocol Version 1.0.

  1. Kansas State University DOE/KEURP Site Operator Program. Year 5 second quarter report, October 1--December 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Hague, J.R.

    1995-12-31

    Kansas State University is displaying, testing, and evaluating electric or hybrid vehicle technology. Data collection and a historical perspective are maintained on vehicle requirements. Two vehicles are electric conversion vehicles from Soleq Corporation of Chicago, Illinois, and four Ford Ranger EVs were procured from Troy Design and manufacturing of Redford, Michigan.

  2. 75 FR 22778 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2010-04-30

    ... to Reduce the Risk of Stand Loss Due to Overly Dense Stand Conditions, Lookout Mountain Ranger... EIS, BLM, NV, Round Mountain Expansion Project, Proposed to Construct and Operate and Expand the Existing Open-Pit Gold Mining and Processing [[Page 22779

  3. 76 FR 75543 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2011-12-02

    ... Hope Project, Molybdenum Mining and Processing Operation in Eureka County, NV, Comment Period Ends: 03... Project, Basewide Water Infrastructure and Stuart Mesa Bridge Replacement, Implementation, San Diego... Treatment Activities, Updated and New Information, Idaho Panhandle National Forests, Priest Lake Ranger...

  4. U.S. architects report increased adoption of green building

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2008-12-15

    This article discussed results of the 2008 Green Index survey conducted by Autodesk Inc., a company that is committed to developing software for easier and more efficient sustainable building design. The survey, which questioned members of the American Institute of Architects (AIA), revealed that architects and building owners have increased the implementation of sustainable design practices in response to a greater demand from clients. An increase in implementing green building elements of 15 per cent from 2007 may indicate a shift in attitude towards climate change. The primary reasons clients are asking for green buildings are reduced operating costs, marketing and marketing demand. The survey showed that 41 per cent of architects are using software to help predict and evaluate the environmental impact and lifecycle of their buildings as well as the HVAC operating costs and alternative building materials. The survey also showed that 24 per cent of architects are currently implementing green roofs on more than half of their new projects, compared with 7 per cent in 2007. Also, 39 per cent are using renewable, on-site energy sources such as solar, wind ,geothermal, low impact hydro, or biomass on more than half of new building designs compared with only 6 per cent in 2007. 1 ref.

  5. Commercial Building Energy Asset Rating Tool User's Guide

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Na; Makhmalbaf, Atefe; Matsumoto, Steven W.

    2012-05-01

    The U.S. Department of Energy’s Commercial Building Energy Asset Rating Tool is a web-based system that is designed to allow building owners, managers, and operators to more accurately assess the energy performance of their commercial buildings. This document provide a step-by-step instruction on how to use the tool.

  6. Energy consumption in buildings for different sport activities

    Energy Technology Data Exchange (ETDEWEB)

    Norrfors, M; Werner, G; Oertenstrand, G

    1978-01-01

    Some buildings for different kinds of sport activities have a great energy demand. The actions which could be taken in order to decrease the energy demand and at the same time decrease the operating costs for these buildings are summarized. References are given to literature of current interest in this field.

  7. Optimal operation of a south double-skin facade

    Energy Technology Data Exchange (ETDEWEB)

    Gratia, E.; De Herde, A. [Universite Catholique de Louvain (Belgium). Architecture et Climat

    2004-01-01

    There is an increasing demand for higher quality office buildings. Occupants and developers of office buildings ask for a healthy and stimulating working environment. Double-skin facades are appropriate when buildings are subject to great external noise and wind loads. A further area of application is in rehabilitation work, when existing facades cannot be renewed, or where this is not desirable. Double-skin facades have a special esthetic of their own, and this can be exploited architecturally to great advantage. However there are still relatively few buildings in which double-skin facades have actually been realized, and there is still too little experience of their behaviour in operation. In this matter, we choose to study a multi-storey double-skin facades behaviour. Simulations were realized with TAS software on the building proposed in the frame of the subtask A of the Task 27 (performance of solar facade components) of the International Energy Agency. Simulations were performed on the chosen building with and without double-skin facades. We decide to study eight types of days; and we analyze the double-skin facade behaviour for various operations. The thermal behaviours of the building with and without double-skin are compared. The study of these eight cases showed the importance of the dynamic use of the double-skin. The operation of this one must be obligatorily related to the climatic conditions as well external as interior and a bad operation of the double-skin could lead to catastrophic results. (author)

  8. Building Canada: Phase One

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2004-04-15

    The 'Building Canada' program modelled after the 'Building America' program, aims at increasing energy efficiency and affordability, primarily for single family homes. The program takes a holistic and whole house view, employing a systems approach and is committed to continuous improvement through testing, evaluation, retesting and novel construction practices. The program's objective is to re-engineer house designs so that builders can take advantage of advanced products and achieve maximum efficiency. Building Canada aims to achieve its objectives through partnership with the housing industry, focusing on increasing energy efficiency while reducing construction time, using and wasting fewer materials, forestalling call backs, and reducing overall costs. The Building Canada procedures encompass marketing, research of builder's operations, re-engineering mechanical systems, framing components and techniques, moisture control and thermal performance, construction, resolution of problems in re-engineered homes, and discussion of results in demonstration homes. The program as a whole is built on the feasibility study of a Building Canada program carried out in Nova Scotia and Ontario. Some of the results of this pilot study summarized in this report indicate that the Building Canada is not suitable for use by small builders. Benefits are most likely to be realized by only by builders constructing more than 100 homes annually.

  9. Estimating building energy consumption using extreme learning machine method

    International Nuclear Information System (INIS)

    Naji, Sareh; Keivani, Afram; Shamshirband, Shahaboddin; Alengaram, U. Johnson; Jumaat, Mohd Zamin; Mansor, Zulkefli; Lee, Malrey

    2016-01-01

    The current energy requirements of buildings comprise a large percentage of the total energy consumed around the world. The demand of energy, as well as the construction materials used in buildings, are becoming increasingly problematic for the earth's sustainable future, and thus have led to alarming concern. The energy efficiency of buildings can be improved, and in order to do so, their operational energy usage should be estimated early in the design phase, so that buildings are as sustainable as possible. An early energy estimate can greatly help architects and engineers create sustainable structures. This study proposes a novel method to estimate building energy consumption based on the ELM (Extreme Learning Machine) method. This method is applied to building material thicknesses and their thermal insulation capability (K-value). For this purpose up to 180 simulations are carried out for different material thicknesses and insulation properties, using the EnergyPlus software application. The estimation and prediction obtained by the ELM model are compared with GP (genetic programming) and ANNs (artificial neural network) models for accuracy. The simulation results indicate that an improvement in predictive accuracy is achievable with the ELM approach in comparison with GP and ANN. - Highlights: • Buildings consume huge amounts of energy for operation. • Envelope materials and insulation influence building energy consumption. • Extreme learning machine is used to estimate energy usage of a sample building. • The key effective factors in this study are insulation thickness and K-value.

  10. Preoperational test report, vent building ventilation system

    International Nuclear Information System (INIS)

    Clifton, F.T.

    1997-01-01

    This represents a preoperational test report for Vent Building Ventilation Systems, Project W-030. Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks. The system provides Heating, Ventilation, and Air Conditioning (HVAC) for the W-030 Ventilation Building. The tests verify correct system operation and correct indications displayed by the central Monitor and Control System

  11. The Application of Intelligent Building Technologies to Space Hotels

    Science.gov (United States)

    Fawkes, S.

    This paper reports that over the last few years Intelligent Building technologies have matured and standardised. It compares the functions of command and control systems in future large space facilities such as space hotels to those commonly found in Intelligent Buildings and looks at how Intelligent Building technologies may be applied to space hotels. Many of the functions required in space hotels are the same as those needed in terrestrial buildings. The adaptation of standardised, low cost, Intelligent Building technologies would reduce capital costs and ease development of future space hotels. Other aspects of Intelligent Buildings may also provide useful models for the development and operation of space hotels.

  12. Energy use in office buildings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    This is the report on Task IB, Familiarization with Additional Data Collection Plans of Annual Survey of BOMA Member and Non-Member Buildings in 20 Cities, of the Energy Use in Office Buildings project. The purpose of the work was to monitor and understand the efforts of the Building Owners and Managers Association International (BOMA) in gathering an energy-use-oriented data base. In order to obtain an improved data base encompassing a broad spectrum of office space and with information suitable for energy analysis in greater detail than is currently available, BOMA undertook a major data-collection effort. Based on a consideration of geographic area, climate, population, and availability of data, BOMA selected twenty cities for data collection. BOMA listed all of the major office space - buildings in excess of 40,000 square feet - in each of the cities. Tax-assessment records, local maps, Chamber of Commerce data, recent industrial-development programs, results of related studies, and local-realtor input were used in an effort to assemble a comprehensive office-building inventory. In order to verify the accuracy and completeness of the building lists, BOMA assembled an Ad-Hoc Review Committee in each city to review the assembled inventory of space. A questionnaire on office-building energy use and building characteristics was developed. In each city BOMA assembled a data collection team operating under the supervision of its regional affiliate to gather the data. For each city a random sample of buildings was selected, and data were gathered. Responses for over 1000 buildings were obtained.

  13. Smart Buildings and Demand Response

    Science.gov (United States)

    Kiliccote, Sila; Piette, Mary Ann; Ghatikar, Girish

    2011-11-01

    Advances in communications and control technology, the strengthening of the Internet, and the growing appreciation of the urgency to reduce demand side energy use are motivating the development of improvements in both energy efficiency and demand response (DR) systems in buildings. This paper provides a framework linking continuous energy management and continuous communications for automated demand response (Auto-DR) in various times scales. We provide a set of concepts for monitoring and controls linked to standards and procedures such as Open Automation Demand Response Communication Standards (OpenADR). Basic building energy science and control issues in this approach begin with key building components, systems, end-uses and whole building energy performance metrics. The paper presents a framework about when energy is used, levels of services by energy using systems, granularity of control, and speed of telemetry. DR, when defined as a discrete event, requires a different set of building service levels than daily operations. We provide examples of lessons from DR case studies and links to energy efficiency.

  14. Using Dashboards to Improve Energy and Comfort in Federal Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence Berkeley National Laboratory; Marini, Kyle; Ghatikar, Girish; Diamond, Richard

    2011-02-01

    Federal agencies are taking many steps to improve the sustainability of their operations, including improving the energy efficiency of their buildings, promoting recycling and reuse of materials, encouraging carpooling and alternative transit schemes, and installing low flow water fixture units are just a few of the common examples. However, an often overlooked means of energy savings is to provide feedback to building users about their energy use through information dashboards connected to a building?s energy information system. An Energy Information System (EIS), broadly defined, is a package of performance monitoring software, data acquisition hardware, and communication systems that is used to collect, store, analyze, and display energy information. At a minimum, the EIS provides the whole-building energy-use information (Granderson 2009a). We define a ?dashboard? as a display and visualization tool that utilizes the EIS data and technology to provide critical information to users. This information can lead to actions resulting in energy savings, comfort improvements, efficient operations, and more. The tools to report analyzed information have existed in the information technology as business intelligence (Few 2006). The dashboard is distinguished from the EIS as a whole, which includes additional hardware and software components to collect and storage data, and analysis for resources and energy management (Granderson 2009b). EIS can be used for a variety of uses, including benchmarking, base-lining, anomaly detection, off-hours energy use evaluation, load shape optimization, energy rate analysis, retrofit and retro-commissioning savings (Granderson 2009a). The use of these EIS features depends on the specific users. For example, federal and other building managers may use anomaly detection to identify energy waste in a specific building, or to benchmark energy use in similar buildings to identify energy saving potential and reduce operational cost. There are

  15. Recovery Act: Training Program Development for Commercial Building Equipment Technicians

    Energy Technology Data Exchange (ETDEWEB)

    Leah Glameyer

    2012-07-12

    The overall goal of this project has been to develop curricula, certification requirements, and accreditation standards for training on energy efficient practices and technologies for commercial building technicians. These training products will advance industry expertise towards net-zero energy commercial building goals and will result in a substantial reduction in energy use. The ultimate objective is to develop a workforce that can bring existing commercial buildings up to their energy performance potential and ensure that new commercial buildings do not fall below their expected optimal level of performance. Commercial building equipment technicians participating in this training program will learn how to best operate commercial buildings to ensure they reach their expected energy performance level. The training is a combination of classroom, online and on-site lessons. The Texas Engineering Extension Service (TEEX) developed curricula using subject matter and adult learning experts to ensure the training meets certification requirements and accreditation standards for training these technicians. The training targets a specific climate zone to meets the needs, specialized expertise, and perspectives of the commercial building equipment technicians in that zone. The combination of efficient operations and advanced design will improve the internal built environment of a commercial building by increasing comfort and safety, while reducing energy use and environmental impact. Properly trained technicians will ensure equipment operates at design specifications. A second impact is a more highly trained workforce that is better equipped to obtain employment. Organizations that contributed to the development of the training program include TEEX and the Texas Engineering Experiment Station (TEES) (both members of The Texas A&M University System). TEES is also a member of the Building Commissioning Association. This report includes a description of the project

  16. User evaluations of energy efficient buildings: the interplay of buildings and users in seven European case studies

    Energy Technology Data Exchange (ETDEWEB)

    Thomsen, Judith; Hauge, Aashild Lappegaard; Denizou, Karine; Jerkoe, Sidsel; Waagoe, Solvaar; Berker, Thomas

    2011-07-01

    The buildings in our study have been operational for just a short period and most of them are still in an adjustment phase. The findings show that users in all case studies often stressed the positive aspects connected to the newness and the architectural quality of the buildings. The interviews also show that energy efficiency is often regarded as a bonus or side effect that is gladly accepted but not the main criteria for choosing a house. Nonetheless, most residents seemed to appreciate the environmental benefits over time. Several respondents were also more concerned about the environment now than before they moved into or started to work in an energy efficient building, and they also reported more environmentally friendly behaviour. In most of the case studies, concerns were expressed about thermal comfort. Informants often experienced the building as too hot in the summer and/or too cold in the winter. This perceived discomfort caused different types of personal actions, which had a potential to interfere with the concept and the calculated energy balance. In order to improve internal conditions, the users in almost every case intervened with the planned use. They found common and known ways to improving their comfort in the buildings without considering how to optimize the new system. None of the respondents had much prior knowledge of energy efficient buildings before moving in or starting to work in the case study buildings. They did not know what to expect from their new environment, and were unfamiliar with the concepts. Many of the informants complained about a lack of information on systems and insufficient training. The studies also show that the occupants desired to control at least some operational aspects. Despite intermittent difficulties with thermal comfort, the tolerance for the buildings performance appeared to be high throughout all the case studies and many respondents were proud of 'their' buildings. Energy efficient buildings are not the

  17. User evaluations of energy efficient buildings: the interplay of buildings and users in seven European case studies

    Energy Technology Data Exchange (ETDEWEB)

    Thomsen, Judith; Hauge, Aashild Lappegaard; Denizou, Karine; Jerkoe, Sidsel; Waagoe, Solvaar; Berker, Thomas

    2011-07-01

    The buildings in our study have been operational for just a short period and most of them are still in an adjustment phase. The findings show that users in all case studies often stressed the positive aspects connected to the newness and the architectural quality of the buildings. The interviews also show that energy efficiency is often regarded as a bonus or side effect that is gladly accepted but not the main criteria for choosing a house. Nonetheless, most residents seemed to appreciate the environmental benefits over time. Several respondents were also more concerned about the environment now than before they moved into or started to work in an energy efficient building, and they also reported more environmentally friendly behaviour. In most of the case studies, concerns were expressed about thermal comfort. Informants often experienced the building as too hot in the summer and/or too cold in the winter. This perceived discomfort caused different types of personal actions, which had a potential to interfere with the concept and the calculated energy balance. In order to improve internal conditions, the users in almost every case intervened with the planned use. They found common and known ways to improving their comfort in the buildings without considering how to optimize the new system. None of the respondents had much prior knowledge of energy efficient buildings before moving in or starting to work in the case study buildings. They did not know what to expect from their new environment, and were unfamiliar with the concepts. Many of the informants complained about a lack of information on systems and insufficient training. The studies also show that the occupants desired to control at least some operational aspects. Despite intermittent difficulties with thermal comfort, the tolerance for the buildings performance appeared to be high throughout all the case studies and many respondents were proud of 'their' buildings. Energy efficient buildings are

  18. Pelaksanaan Kontrak Kerjasama dengan Sistem Bangun Guna Serah / Build Operate Transfer (Bot) dalam Pembangunan Infrastruktur Jalan Tol Medan – Kualanamu – Tebing Tinggi

    OpenAIRE

    Budi Santoso, Rinitami Njatrijani, Putri Anita Sitanggang*

    2017-01-01

    Kontrak kerjasama dengan sistem bangun guna serah / Build Operate Transfer (BOT) yang diterapkan dalam Perjanjian Pengusahaan Jalan Tol (PPJT) telah membantu pemerintah dalam membangun Jalan Tol Medan – Kualanamu – Tebing Tinggi. Dengan adanya sistem BOT, maka pemerintah tidak lagi kesulitan dalam penyediaan dana untuk merealisasikan jalan tol tersebut. Disamping itu pelaksanaan kontrak kerjasama tersebut haruslah mengacu pada Peraturan Presiden Nomor 38 Tahun 2015 tentang Kerjasama Pemerinta...

  19. Prevention of uncontrolled progressive collapse of a high-rise brick building

    Directory of Open Access Journals (Sweden)

    Pakhmurin Oleg

    2018-01-01

    Full Text Available In recent years, there is a trend towards increasing the failure rate of buildings and structures as a result of unforeseen situations. This study is aimed at assessing the operational reliability of the structure to prevent emergencies and progressive collapse. The behavior of structures affected by various factors was analyzed. The operational condition of a building with stone walls and a rigid structural frame constructed in the middle of the 20th century was considered. By means of a detailed instrumental examination, effects of long-term operation, climatic factors and violations during construction on the serviceability of the building were analyzed. Geotechnical conditions of the site were investigated. Necessary re-calculations for load-bearing structural elements and foundations were carried out. An expected failure diagram for vertical load-bearing structures of the building is presented. Proposals for preventing progressive collapse were developed on the basis of the author's technique.

  20. The importance of ergonomics to sustainability throughout a building's life cycle.

    Science.gov (United States)

    Miller, Linda; Dorsey, Julie; Jacobs, Karen

    2012-01-01

    Protecting and conserving environmental resources is a global concern. Over the past decade, a number of certification processes have emerged to help designers and operators of buildings assess the potential impact of a building on the environment. Certifications such as the Leadership in Energy and Environmental Design (LEED) consider the environmental impact through the lifecycle of a building, but may not be considering the people that construct and utilize it. It is important to remember the human factor. Considering the human factor throughout the lifecycle is crucial to ensure individuals are protected during construction and in operation in the built environment. The paper highlights how ergonomics can be integrated into the life cycle of a building to promote sustainability goals for both the human factor and the environment. A case study approach will be used to illustrate how ergonomics was integrated into a LEED renovation and expanded into its daily operations on a large university campus..

  1. The chemistry of Magela Creek. A baseline for assessing change downstream of Ranger. Supervising Scientist report 151

    International Nuclear Information System (INIS)

    Klessa, D.A.

    2000-01-01

    The compositions of waters in Magela Creek upstream and downstream of Ranger uranium mine were reviewed. The water quality parameters examined were pH, electrical conductivity (EC) and turbidity, and dissolved calcium, magnesium, sodium, potassium, chloride, sulphate, ammonium, nitrate, copper, lead, manganese, zinc, uranium and radium-226. The frequency distributions of each of these parameters in waters upstream of the mine were characterised and statistically described to provide a baseline which allows a change in water chemistry downstream of the mine to be assessed. With the exception of pH, EC, turbidity, magnesium, calcium, sodium and manganese, data that comprise the baseline are not normally distributed. The frequency distributions of copper, lead, zinc, uranium and radium-226 forming the baseline are characterised by a large proportion of values at or near analytical detection limits and contamination in a relatively large proportion of the remainder. A comparison of upstream and downstream data shows that there is good conformity in pH, EC, turbidity, sodium, potassium and chloride. For calcium, nitrate, ammonium, lead, uranium, radium and zinc less than 40% of the downstream data fall outside the 20th and 80th baseline percentiles but in the ease of U, data are biased towards relatively high values. More than 40% of downstream magnesium and sulphate data are outside these percentile boundaries and are skewed towards relatively high concentrations. Copper, lead and zinc in mine waters (characterised by the composition of waters contained in the former RP4) do not appear to pose a risk as contaminants based upon the results of toxicity testing and water quality guideline trigger levels with risk minimised for greater than 1 in 20 dilution

  2. National Ignition Facility subsystem design requirements optics assembly building (OAB) SSDR 1.2.2.3

    International Nuclear Information System (INIS)

    Kempel, P.; Hands, J.

    1996-01-01

    This Subsystem Design Requirement (SSDR) document establishes the performance, design, and verification requirements 'for the conventional building systems and subsystems of the Optics Assembly Building (OAB). These building system requirements are associated with housing and supporting the operational flow of personnel and materials throughout the OAB for preparing and repairing optical and mechanical components used in the National Ignition Facility (NIF) Laser and Target Building (LTAB). This SSDR addresses the following subsystems associated with the OAB: * Structural systems for the building spaces and operational-support equipment and building- support equipment. * Architectural building features associated with housing the space, operational cleanliness, and functional operation of the facility. * Heating, Ventilating, and Air Conditioning (HVAC) systems for maintaining a clean and thermally stable ambient environment within the facility. * Plumbing systems that provide potable water and sanitary facilities for the occupants and stormwater drainage for transporting rainwater. * Fire Protection systems that guard against fire damage to the facility and its contents. * Material handling equipment for transferring optical assemblies and other materials within building areas and to the LTAB. * Mechanical process piping systems for liquids and gases that provide cooling, cleaning, and other service to optical and mechanical components. * Electrical power and grounding systems that provide service to the building and equipment, including lighting distribution and communications systems for the facilities. * Instrumentation and control systems that ensure the safe operation of conventional facilities systems, such as those listed above. Generic design criteria, such as siting data, seismic requirements, utility availability, and other information that contributes to the OAB design, are not addressed in this document

  3. Natural vibration experimental analysis of Novovoronezhskaya NPP main building

    International Nuclear Information System (INIS)

    Zoubkov, D.; Isaikin, A.; Shablinsky, G.; Lopanchuk, A.; Nefedov, S.

    2005-01-01

    1. Natural vibration frequencies are main characteristics of buildings and structures which allow to give integral estimation of their in-service state. Even relatively small changes of these frequencies as compared to the initially registered values point to serious defects of building structures. In this paper we analyzed natural vibration frequencies and natural modes of the main building (MB) of Novovoronezhskaya NPP operating nuclear unit with WWER-440 type reactor. The MB consists of a reactor compartment (RC), a machine room (MR) and an electric device (ED) unit positioned in between. 2. Natural vibration frequencies and natural modes of the MB were determined experimentally by analyzing its microvibrations caused by operation of basic equipment (turbines, pumps, etc.). Microvibrations of the main building were measured at 12 points. At each point measurements were carried out along two or three mutually perpendicular vibration directions. Spectral analysis of vibration records has been conducted. Identification of natural vibration frequencies was carried out on the basis of the spectral peaks and plotted vibration modes (taking into account operating frequencies of the basic equipment of the power generating unit). On the basis of the measurement results three transverse modes and corresponding natural vibration frequencies of the MB, one longitudinal mode and corresponding natural vibration frequency of the MB and two natural frequencies of vertical vibrations of RC and MR floor trusses (1st and 2nd symmetric forms) were determined. Dynamic characteristics of the main building of NV NPP resulting from full scale researches are supposed to be used as one of building structure stability criteria. (authors)

  4. Energy Cloud: Services for Smart Buildings

    DEFF Research Database (Denmark)

    Mohamed, Nader; Al-Jaroodi, Jameela; Lazarova-Molnar, Sanja

    2018-01-01

    , and network technologies. Using smart building energy management systems provides intelligent procedures to control buildings’ equipment such as HVAC (heating, ventilating, and air-conditioning) systems, home and office appliances, and lighting systems to reduce energy consumption while maintaining......Energy consumption in buildings is responsible for a significant portion of the total energy use and carbon emissions in large cities. One of the main approaches to reduce energy consumption and its environmental impact is to convert buildings into smart buildings using computer, software, sensor...... the required quality of living in all of the building’s spaces. This chapter discusses and reviews utilizing cloud computing to provide energy-related services to enhance the operations of smart buildings’ energy management systems. Cloud computing can provide many advantages for smart buildings’ energy...

  5. Data and analytics to inform energy retrofit of high performance buildings

    International Nuclear Information System (INIS)

    Hong, Tianzhen; Yang, Le; Hill, David; Feng, Wei

    2014-01-01

    Highlights: • High performance buildings can be retrofitted using measured data and analytics. • Data of energy use, systems operating and environmental conditions are needed. • An energy data model based on the ISO Standard 12655 is key for energy benchmarking. • Three types of analytics are used: energy profiling, benchmarking, and diagnostics. • The case study shows 20% of electricity can be saved by retrofit. - Abstract: Buildings consume more than one-third of the world’s primary energy. Reducing energy use in buildings with energy efficient technologies is feasible and also driven by energy policies such as energy benchmarking, disclosure, rating, and labeling in both the developed and developing countries. Current energy retrofits focus on the existing building stocks, especially older buildings, but the growing number of new high performance buildings built around the world raises a question that how these buildings perform and whether there are retrofit opportunities to further reduce their energy use. This is a new and unique problem for the building industry. Traditional energy audit or analysis methods are inadequate to look deep into the energy use of the high performance buildings. This study aims to tackle this problem with a new holistic approach powered by building performance data and analytics. First, three types of measured data are introduced, including the time series energy use, building systems operating conditions, and indoor and outdoor environmental parameters. An energy data model based on the ISO Standard 12655 is used to represent the energy use in buildings in a three-level hierarchy. Secondly, a suite of analytics were proposed to analyze energy use and to identify retrofit measures for high performance buildings. The data-driven analytics are based on monitored data at short time intervals, and cover three levels of analysis – energy profiling, benchmarking and diagnostics. Thirdly, the analytics were applied to a high

  6. Development of a California commercial building benchmarking database

    International Nuclear Information System (INIS)

    Kinney, Satkartar; Piette, Mary Ann

    2002-01-01

    Building energy benchmarking is a useful starting point for commercial building owners and operators to target energy savings opportunities. There are a number of tools and methods for benchmarking energy use. Benchmarking based on regional data can provides more relevant information for California buildings than national tools such as Energy Star. This paper discusses issues related to benchmarking commercial building energy use and the development of Cal-Arch, a building energy benchmarking database for California. Currently Cal-Arch uses existing survey data from California's Commercial End Use Survey (CEUS), a largely underutilized wealth of information collected by California's major utilities. Doe's Commercial Building Energy Consumption Survey (CBECS) is used by a similar tool, Arch, and by a number of other benchmarking tools. Future versions of Arch/Cal-Arch will utilize additional data sources including modeled data and individual buildings to expand the database

  7. Estimating Fallout Building Attributes from Architectural Features and Global Earthquake Model (GEM) Building Descriptions

    Energy Technology Data Exchange (ETDEWEB)

    Dillon, Michael B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Kane, Staci R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-03-01

    A nuclear explosion has the potential to injure or kill tens to hundreds of thousands (or more) of people through exposure to fallout (external gamma) radiation. Existing buildings can protect their occupants (reducing fallout radiation exposures) by placing material and distance between fallout particles and individuals indoors. Prior efforts have determined an initial set of building attributes suitable to reasonably assess a given building’s protection against fallout radiation. The current work provides methods to determine the quantitative values for these attributes from (a) common architectural features and data and (b) buildings described using the Global Earthquake Model (GEM) taxonomy. These methods will be used to improve estimates of fallout protection for operational US Department of Defense (DoD) and US Department of Energy (DOE) consequence assessment models.

  8. Solar-assisted absorption air-conditioning systems in buildings: Control strategies and operational modes

    International Nuclear Information System (INIS)

    Shirazi, Ali; Pintaldi, Sergio; White, Stephen D.; Morrison, Graham L.; Rosengarten, Gary; Taylor, Robert A.

    2016-01-01

    Highlights: • A simulation model of a solar driven absorption chiller is developed in detail. • Three control strategies were proposed in the solar loop of the plant. • Series and parallel auxiliary heater arrangements were investigated. • The results showed the auxiliary-heater in parallel outperformed the series one. • Solar fraction can be increased by 20% by implementing the proposed configuration. - Abstract: Solar-assisted cooling technology has enormous potential for air-conditioning applications since both solar energy supply and cooling energy demand are well correlated. Unfortunately, market uptake of solar cooling technologies has been slow due to the high capital cost and limited design/operational experience. In the present work, different designs and operational modes for solar heating and cooling (SHC) absorption chiller systems are investigated and compared in order to identify the preferred design strategies for these systems. Three control scenarios are proposed for the solar collector loop. The first uses a constant flow pump, while the second and third control schemes employ a variable speed pump, where the solar collector (SC) set-point temperature could be either fixed or adjusted to the required demand. Series and parallel arrangements, between the auxiliary heater and the storage tank, have been examined in detail from an energy efficiency perspective. A simulation model for different system layouts is developed in the transient system simulation environment (TRNSYS, Version 17). Simulation results revealed that the total solar fraction of the plant is increased by up to 11% when a variable speed solar loop pump is used to achieve a collector set-point temperature adjusted according to the building load demand. Another significant finding of this study is that a parallel configuration for the auxiliary heater out-performs a conventional series configuration. The yearly performance of an auxiliary heater in parallel with the storage

  9. Ten questions concerning integrating smart buildings into the smart grid

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence, Thomas M.; Boudreau, Marie-Claude; Helsen, Lieve; Henze, Gregor; Mohammadpour, Javad; Noonan, Doug; Patteeuw, Dieter; Pless, Shanti; Watson, Richard T.

    2016-11-01

    Recent advances in information and communications technology (ICT) have initiated development of a smart electrical grid and smart buildings. Buildings consume a large portion of the total electricity production worldwide, and to fully develop a smart grid they must be integrated with that grid. Buildings can now be 'prosumers' on the grid (both producers and consumers), and the continued growth of distributed renewable energy generation is raising new challenges in terms of grid stability over various time scales. Buildings can contribute to grid stability by managing their overall electrical demand in response to current conditions. Facility managers must balance demand response requests by grid operators with energy needed to maintain smooth building operations. For example, maintaining thermal comfort within an occupied building requires energy and, thus an optimized solution balancing energy use with indoor environmental quality (adequate thermal comfort, lighting, etc.) is needed. Successful integration of buildings and their systems with the grid also requires interoperable data exchange. However, the adoption and integration of newer control and communication technologies into buildings can be problematic with older legacy HVAC and building control systems. Public policy and economic structures have not kept up with the technical developments that have given rise to the budding smart grid, and further developments are needed in both technical and non-technical areas.

  10. Low-carbon building assessment and multi-scale input-output analysis

    Science.gov (United States)

    Chen, G. Q.; Chen, H.; Chen, Z. M.; Zhang, Bo; Shao, L.; Guo, S.; Zhou, S. Y.; Jiang, M. M.

    2011-01-01

    Presented as a low-carbon building evaluation framework in this paper are detailed carbon emission account procedures for the life cycle of buildings in terms of nine stages as building construction, fitment, outdoor facility construction, transportation, operation, waste treatment, property management, demolition, and disposal for buildings, supported by integrated carbon intensity databases based on multi-scale input-output analysis, essential for low-carbon planning, procurement and supply chain design, and logistics management.

  11. 77 FR 51044 - Cabo Rojo National Wildlife Refuge, PR; Final Comprehensive Conservation Plan and Finding of No...

    Science.gov (United States)

    2012-08-23

    ... education and interpretation, and conservation projects); commercial harvesting of sea salt; wildlife... Act. Comments We made copies of the Draft CCP/EA available for a 30-day public review and comment... engineering equipment operators, park ranger (environmental education), volunteer coordinator, GIS specialist...

  12. 77 FR 14360 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2012-03-09

    ..., WA, Mid-Columbia Coho Restoration Program, Proposal to Fund the Construction, Operation, and.... Davis, 301-415- 3835. EIS No. 20120059, Final EIS, USFS, SD, Section 30 Limestone Mining Project, Proposal to Implement Mining Actions, Mystic Ranger District, Black Hills National Forest, Rapid City...

  13. Better Building Alliance, Plug and Process Loads in Commercial Buildings: Capacity and Power Requirement Analysis (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    This brochure addresses gaps in actionable knowledge that can help reduce the plug load capacities designed into buildings. Prospective building occupants and real estate brokers lack accurate references for plug and process load (PPL) capacity requirements, so they often request 5-10 W/ft2 in their lease agreements. This brochure should be used to make these decisions so systems can operate more energy efficiently; upfront capital costs will also decrease. This information can also be used to drive changes in negotiations about PPL energy demands. It should enable brokers and tenants to agree about lower PPL capacities. Owner-occupied buildings will also benefit. Overestimating PPL capacity leads designers to oversize electrical infrastructure and cooling systems.

  14. Modeling and Analysis of Commercial Building Electrical Loads for Demand Side Management

    Science.gov (United States)

    Berardino, Jonathan

    In recent years there has been a push in the electric power industry for more customer involvement in the electricity markets. Traditionally the end user has played a passive role in the planning and operation of the power grid. However, many energy markets have begun opening up opportunities to consumers who wish to commit a certain amount of their electrical load under various demand side management programs. The potential benefits of more demand participation include reduced operating costs and new revenue opportunities for the consumer, as well as more reliable and secure operations for the utilities. The management of these load resources creates challenges and opportunities to the end user that were not present in previous market structures. This work examines the behavior of commercial-type building electrical loads and their capacity for supporting demand side management actions. This work is motivated by the need for accurate and dynamic tools to aid in the advancement of demand side operations. A dynamic load model is proposed for capturing the response of controllable building loads. Building-specific load forecasting techniques are developed, with particular focus paid to the integration of building management system (BMS) information. These approaches are tested using Drexel University building data. The application of building-specific load forecasts and dynamic load modeling to the optimal scheduling of multi-building systems in the energy market is proposed. Sources of potential load uncertainty are introduced in the proposed energy management problem formulation in order to investigate the impact on the resulting load schedule.

  15. COMPONENTS PROVISION MANAGEMENT FOR MACHINE BUILDING MANUFACTURER

    Directory of Open Access Journals (Sweden)

    Ekaterina P. Bochkareva

    2014-01-01

    Full Text Available In the paper is given an approach to themanagement of components provision formachine building manufacturer based uponinternational standards and best practicesof leading international companies. Thecomplex expertise methods are used forthe development of the proposed machinebuilding manufacturer suppliers’ operational management method. At a strategic level is proposed a tool for planning the suppliers’portfolio and a machine building manufacturer supplier development methodology.

  16. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  17. Application and optimization of input parameter spaces in mass flow modelling: a case study with r.randomwalk and r.ranger

    Science.gov (United States)

    Krenn, Julia; Zangerl, Christian; Mergili, Martin

    2017-04-01

    r.randomwalk is a GIS-based, multi-functional, conceptual open source model application for forward and backward analyses of the propagation of mass flows. It relies on a set of empirically derived, uncertain input parameters. In contrast to many other tools, r.randomwalk accepts input parameter ranges (or, in case of two or more parameters, spaces) in order to directly account for these uncertainties. Parameter spaces represent a possibility to withdraw from discrete input values which in most cases are likely to be off target. r.randomwalk automatically performs multiple calculations with various parameter combinations in a given parameter space, resulting in the impact indicator index (III) which denotes the fraction of parameter value combinations predicting an impact on a given pixel. Still, there is a need to constrain the parameter space used for a certain process type or magnitude prior to performing forward calculations. This can be done by optimizing the parameter space in terms of bringing the model results in line with well-documented past events. As most existing parameter optimization algorithms are designed for discrete values rather than for ranges or spaces, the necessity for a new and innovative technique arises. The present study aims at developing such a technique and at applying it to derive guiding parameter spaces for the forward calculation of rock avalanches through back-calculation of multiple events. In order to automatize the work flow we have designed r.ranger, an optimization and sensitivity analysis tool for parameter spaces which can be directly coupled to r.randomwalk. With r.ranger we apply a nested approach where the total value range of each parameter is divided into various levels of subranges. All possible combinations of subranges of all parameters are tested for the performance of the associated pattern of III. Performance indicators are the area under the ROC curve (AUROC) and the factor of conservativeness (FoC). This

  18. Uranium production in Australia

    International Nuclear Information System (INIS)

    Fisk, B.G.

    1984-01-01

    The history of uranium mining and milling in Australia is briefly outlined, particular attention being given to the development of Australia's only two operating mills, Nabarlek and Ranger, and its only operating mine, Ranger. The latter project is used to illustrate the prerequisites for development of the industry and the complex roles of the various parties involved in establishing a new mine: equity holders, customers, financiers, the securities industry, trade unions, and the public. The moves currently being taken to resolve the future of the industry in Australia, particularly the examination of issues relating to Australia's role in the nuclear fuel cycle being conducted by the Australian Science and Technology Council, preclude any firm conclusions being drawn, but the various options open to the government are reviewed and the record of Australian governments and unions and the attitude of the Australian public are described. (Author) (3 tabs., fig.)

  19. Indoor air quality environmental information handbook: Building system characteristics

    International Nuclear Information System (INIS)

    1987-01-01

    This manual, the third in a series, focuses on residential building system characteristics and their effects on indoor air quality. The manual addresses: residential indoor air pollutants by source, indoor concentrations, health effects, source control and mitigation techniques, standards and guidelines; building system characteristics of air exchange, pollutant source strength, residence volume, site characteristics, structural design, construction, and operation, infiltration and ventilation system, building occupancy; and monitoring methods

  20. Hydraulic Control Method for Heating Systems of High-Rise Buildings

    Science.gov (United States)

    Makarov, D.; Chernenkov, V.; Likhachev, I.

    2017-11-01

    The following article reflects the ideas of possibility to increase energy efficiency of heating systems in high-rise buildings. The article also includes the principle ways of high-rise building heating systems operation as well as traditional engineering decisions aimed at the elimination of the increased pressure effect in heaters. The main disadvantages of such decisions are also presented for the reader. Moreover, the article offers the way of operation for the above-mentioned systems together with the equipment that implements this operation. An economic impact from such energy-saving technology application has been also evaluated.

  1. Building Trust in High-Performing Teams

    Directory of Open Access Journals (Sweden)

    Aki Soudunsaari

    2012-06-01

    Full Text Available Facilitation of growth is more about good, trustworthy contacts than capital. Trust is a driving force for business creation, and to create a global business you need to build a team that is capable of meeting the challenge. Trust is a key factor in team building and a needed enabler for cooperation. In general, trust building is a slow process, but it can be accelerated with open interaction and good communication skills. The fast-growing and ever-changing nature of global business sets demands for cooperation and team building, especially for startup companies. Trust building needs personal knowledge and regular face-to-face interaction, but it also requires empathy, respect, and genuine listening. Trust increases communication, and rich and open communication is essential for the building of high-performing teams. Other building materials are a shared vision, clear roles and responsibilities, willingness for cooperation, and supporting and encouraging leadership. This study focuses on trust in high-performing teams. It asks whether it is possible to manage trust and which tools and operation models should be used to speed up the building of trust. In this article, preliminary results from the authors’ research are presented to highlight the importance of sharing critical information and having a high level of communication through constant interaction.

  2. The building blocks of a 'Liveable Neighbourhood': Identifying the key performance indicators for walking of an operational planning policy in Perth, Western Australia.

    Science.gov (United States)

    Hooper, Paula; Knuiman, Matthew; Foster, Sarah; Giles-Corti, Billie

    2015-11-01

    Planning policy makers are requesting clearer guidance on the key design features required to build neighbourhoods that promote active living. Using a backwards stepwise elimination procedure (logistic regression with generalised estimating equations adjusting for demographic characteristics, self-selection factors, stage of construction and scale of development) this study identified specific design features (n=16) from an operational planning policy ("Liveable Neighbourhoods") that showed the strongest associations with walking behaviours (measured using the Neighbourhood Physical Activity Questionnaire). The interacting effects of design features on walking behaviours were also investigated. The urban design features identified were grouped into the "building blocks of a Liveable Neighbourhood", reflecting the scale, importance and sequencing of the design and implementation phases required to create walkable, pedestrian friendly developments. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. Strategies and Challenges for Energy Efficient Retrofitting: Study of the Empire State Building

    Science.gov (United States)

    De, B.; Mukherjee, M.

    2013-11-01

    Operational and maintenance cost of existing buildings is escalating making it tough for both the owner and the tenants. Retrofitting them with state of the art technologies help them to keep pace with amended recent code provisions and thus extending the older building stocks one more chance to live responsively. Retrofitted iconic buildings can thus retain their status in commerce driven real estate sector. It helps in reducing green house gas emission as well. World's iconic skyscraper, the Empire State Building (ESB), has undergone an exemplary retrofit process since 2008 to reduce its energy demands. To achieve the goal of operational cost and energy consumption reduction, stiff challenges had taken care in a systematic manner to realize benefit throughout the entire lifespan of the ESB. Least disturbances to the tenant and on-site component handling strategies required precise planning. The present paper explores strategies and process adopted for retrofitting the ESB, and derived insightful guidelines towards operational cost savings and energy efficiency of existing buildings through retrofitting.

  4. Proposal for the award of an industrial support contract for the maintenance of and work on tertiary buildings at CERN, and operation of their installations

    CERN Document Server

    2005-01-01

    This document concerns the award of a contract for maintenance of and work on tertiary (i.e. non-accelerator) buildings and operation of their installations. The Finance Committee is invited to agree to the negotiation of a contract with the consortium CEGELEC CENTRE EST (FR) â?" CEGELEC (CH) â?" G.T.M. (FR), the lowest bidder complying with the specification, for the provision of the maintenance of and work on tertiary buildings at CERN, and operation of their installations, for three years for a total amount not exceeding 9 346 650 euros (14 379 454 Swiss francs), not subject to revision until 1st January 2009, with options for additional services for an amount not exceeding 457 600 euros (704 000 Swiss francs), not subject to revision until 1st January 2009, bringing the total to an amount not exceeding 9 804 250 euros (15 083 454 Swiss francs), not subject to revision until 1st January 2009. The contract will include options for two one-year extensions beyond the initial three-year period.

  5. 49 CFR 41.117 - Buildings built with Federal assistance.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Buildings built with Federal assistance. 41.117 Section 41.117 Transportation Office of the Secretary of Transportation SEISMIC SAFETY § 41.117 Buildings built with Federal assistance. (a) Each DOT Operating Administration assisting in the financing, through...

  6. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1992-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. For continuous training of the existing operator staff the Service has prepared and published eleven booklets: Nuclear reactor; RA reactor primary coolant loop; System for purification of heavy water; reactor helium system; system for technical water; electric power system; control and operation; ventilation system in the reactor building; special sewage system; construction properties of the reactor core; reactor building and installations. During the reporting period there have been no accidents nor incidents that could affect the reactor personnel [sr

  7. Methodology to Assess No Touch Audit Software Using Simulated Building Utility Data

    Energy Technology Data Exchange (ETDEWEB)

    Cheung, Howard [Purdue Univ., West Lafayette, IN (United States); Braun, James E. [Purdue Univ., West Lafayette, IN (United States); Langner, M. Rois [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-10-01

    This report describes a methodology developed for assessing the performance of no touch building audit tools and presents results for an available tool. Building audits are conducted in many commercial buildings to reduce building energy costs and improve building operation. Because the audits typically require significant input obtained by building engineers, they are usually only affordable for larger commercial building owners. In an effort to help small building and business owners gain the benefits of an audit at a lower cost, no touch building audit tools have been developed to remotely analyze a building's energy consumption.

  8. Commissioning of energy-efficiency measures: Costs and benefits for 16 buildings

    Energy Technology Data Exchange (ETDEWEB)

    Piette, M.A.; Nordman, B.; Greenberg, S.

    1995-04-01

    Building systems and energy-efficiency measures (EEMs) often don`t perform as well in practice as expected at the design stage. This fact has become clear to many organizations concerned with ensuring building performance. What to do about these problems is less clear. Several electric utilities around the U.S. have begun to take action to address the start-up, control, and operational problems that are found in nearly every building. One of the most beneficial periods to intervene in the building life cycle is during the start-up phase of a now building. Building commissioning during start up is such an intervention. Commissioning can be defined as: a set of procedures, responsibilities, and methods to advance a system from static installation to full working order in accordance with design intent. In broad terms, commissioning can extend from design reviews through operations and maintenance planning and training. With such a broad scope aimed at the entire building life cycle, commissioning is often likened to {open_quotes}Total Quality Management{close_quotes} Yet the heart of commissioning are the procedures developed and executed to ensure that all building systems function as intended. The incorporation of energy-efficiency criteria into building commissioning is a new development.

  9. Development of a California commercial building benchmarking database

    Energy Technology Data Exchange (ETDEWEB)

    Kinney, Satkartar; Piette, Mary Ann

    2002-05-17

    Building energy benchmarking is a useful starting point for commercial building owners and operators to target energy savings opportunities. There are a number of tools and methods for benchmarking energy use. Benchmarking based on regional data can provides more relevant information for California buildings than national tools such as Energy Star. This paper discusses issues related to benchmarking commercial building energy use and the development of Cal-Arch, a building energy benchmarking database for California. Currently Cal-Arch uses existing survey data from California's Commercial End Use Survey (CEUS), a largely underutilized wealth of information collected by California's major utilities. Doe's Commercial Building Energy Consumption Survey (CBECS) is used by a similar tool, Arch, and by a number of other benchmarking tools. Future versions of Arch/Cal-Arch will utilize additional data sources including modeled data and individual buildings to expand the database.

  10. Drinking water quality and formation of biofilms in an office building during its first year of operation, a full scale study.

    Science.gov (United States)

    Inkinen, Jenni; Kaunisto, Tuija; Pursiainen, Anna; Miettinen, Ilkka T; Kusnetsov, Jaana; Riihinen, Kalle; Keinänen-Toivola, Minna M

    2014-02-01

    Complex interactions existing between water distribution systems' materials and water can cause a reduction in water quality and unwanted changes in materials, aging or corrosion of materials and formation of biofilms on surfaces. Substances leaching from pipe materials and water fittings, as well as the microbiological quality of water and formation of biofilms were evaluated by applying a Living Lab theme i.e. a research in a real life setting using a full scale system during its first year of operation. The study site was a real office building with one part of the building lined with copper pipes, the other with cross-linked polyethylene (PEX) pipes thus enabling material comparison; also differences within the cold and hot water systems were analysed. It was found that operational conditions, such as flow conditions and temperature affected the amounts of metals leaching from the pipe network. In particular, brass components were considered to be a source of leaching; e. g. the lead concentration was highest during the first few weeks after the commissioning of the pipe network when the water was allowed to stagnate. Assimilable organic carbon (AOC) and microbially available phosphorus (MAP) were found to leach from PEX pipelines with minor effects on biomass of the biofilm. Cultivable and viable biomass (heterotrophic plate count (HPC), and adenosine triphosphate (ATP)) levels in biofilms were higher in the cold than in the hot water system whereas total microbial biomass (total cell count (DAPI)) was similar with both systems. The type of pipeline material was not found to greatly affect the microbial biomass or Alpha-, Beta- and Gammaproteobacteria profiles (16s rRNA gene copies) after the first one year of operation. Also microbiological quality of water was found to deteriorate due to stagnation. Copyright © 2013 Elsevier Ltd. All rights reserved.

  11. Reexamining Ground SOF Command and Control: Does One Size Fit All

    Science.gov (United States)

    2016-12-01

    controlling forces and operations in the accomplishment of the mission.”19 Essentially, command gives, among other things, legal authority to an individual...of capturing Aidid. E. OPERATIONAL EFFECTIVENESS OF SOF TF Ranger executed six missions and aborted 35–40 missions during its deployment in support...of Operation RESTORE HOPE. The aborted missions were due to a lack of intelligence reporting. Of the six missions executed three were night-time

  12. Efforts to control radiation build-up in Ringhals

    Energy Technology Data Exchange (ETDEWEB)

    Egner, K.; Aronsson, P.O.; Erixon, O. [Vattenfall AB, Vaeroebacka (Sweden)

    1995-03-01

    It is well known that good control of the primary chemistry in a PWR is essential in order to minimize material problems and fuel damages. It has also been well established that the water chemistry has a great influence on accumulation of corrosion products on the fuel and the radiation build-up on primary system surfaces. Ringhals was one of the pioneers to increase operating pH in order to reduce radiation build-up and has now been operating for ten years with pH at 7.4 or (in later years) 7.2. Our experience is favourable and includes low radiation levels in the new (1989) steam generators of Ringhals 2. Ringhals 4 has operated almost its whole life at pH 7.2 or higher and it remains one of the cleanest PWRs of its vintage. In addition to strict adherence to a stable operating chemistry, Ringhals is now working on a program with the aim to find optimum shut-down and start-up chemistry to reduce activity levels in the primary systems. A particular goal is to use the shut-down and start-up chemistry at the 1994 outage in Ringhals 3 in order to reduce doserates in preparation for the planned steam generator replacement in 1995. The paper summarizes the experience to date of the established operating chemistry, on-going tests with modified shut-down and start-up chemistry and other measures to limit or reduce the activity build-up.

  13. Efforts to control radiation build-up in Ringhals

    International Nuclear Information System (INIS)

    Egner, K.; Aronsson, P.O.; Erixon, O.

    1995-01-01

    It is well known that good control of the primary chemistry in a PWR is essential in order to minimize material problems and fuel damages. It has also been well established that the water chemistry has a great influence on accumulation of corrosion products on the fuel and the radiation build-up on primary system surfaces. Ringhals was one of the pioneers to increase operating pH in order to reduce radiation build-up and has now been operating for ten years with pH at 7.4 or (in later years) 7.2. Our experience is favourable and includes low radiation levels in the new (1989) steam generators of Ringhals 2. Ringhals 4 has operated almost its whole life at pH 7.2 or higher and it remains one of the cleanest PWRs of its vintage. In addition to strict adherence to a stable operating chemistry, Ringhals is now working on a program with the aim to find optimum shut-down and start-up chemistry to reduce activity levels in the primary systems. A particular goal is to use the shut-down and start-up chemistry at the 1994 outage in Ringhals 3 in order to reduce doserates in preparation for the planned steam generator replacement in 1995. The paper summarizes the experience to date of the established operating chemistry, on-going tests with modified shut-down and start-up chemistry and other measures to limit or reduce the activity build-up

  14. Design of model based LQG control for integrated building systems

    NARCIS (Netherlands)

    Yahiaoui, A.; Hensen, J.L.M.; Soethout, L.L.; Paassen, van A.H.C.

    2006-01-01

    The automation of the operation of integrated building systems requires using modern control techniques to enhance the quality of the building indoor environments. This paper describes the theatrical base and practical application of an optimal dynamic regulator using modelbased Linear Quadratic

  15. Overview of Commercial Building Partnerships in Higher Education

    Energy Technology Data Exchange (ETDEWEB)

    Schatz, Glenn [Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2013-03-01

    Higher education uses less energy per square foot than most commercial building sectors. However, higher education campuses house energy-intensive laboratories and data centers that may spend more than this average; laboratories, in particular, are disproportionately represented in the higher education sector. The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems–including some considered too costly or technologically challenging–and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions.

  16. It's Not Easy Building Green.

    Science.gov (United States)

    Higgins, Joseph

    2003-01-01

    Discusses green buildings, facilities designed, constructed, and operated in an environmentally friendly and resource-efficient way. Discusses reasons for campuses to "go green," the "shades of green" or variations in environmental-friendliness, certification through the Leadership in Energy and Environmental Design (LEED) rating system, financial…

  17. System-Level Monitoring and Diagnosis of Building HVAC System

    OpenAIRE

    Wu, Siyu

    2013-01-01

    Heating, ventilation, and air conditioning (HVAC) is an indoor environmental technology that is extensively instrumented for large-scale buildings. Among all subsystems of buildings, the HVAC system dominates the energy consumption and accounts for 57% of the energy used in U.S. commercial and residential buildings. Unfortunately, the HVAC system may fail to meet the performance expectations due to various faults, including not only complete hardware failures, but also non-optimal operations....

  18. Development of predictive control strategies for building climate control

    OpenAIRE

    NAGPAL, HIMANSHU

    2018-01-01

    APPROVED The rapid growth in energy usage and CO2 emissions has become a critical issue for the whole world. It is noteworthy that buildings are a major contributor to global primary energy consumption. Among building services, use of energy in heating-ventilation-air-conditioning (HVAC) system is particularly significant (about 50\\% of the total building energy consumption). Therefore, the development and implementation of effective control strategies to optimize the operation of HVAC sys...

  19. US Green Building Council's Leadership in Energy and Environmental Design (LEED®)

    Science.gov (United States)

    A series of rating systems aimed at increasing the environmental and health performance of buildings' sites and structures and of neighborhoods. LEED® covers the design, construction, and operations of all types of buildings.

  20. Greening Existing Buildings in Contemporary Iraqi Urban Reality/ Virtual Model

    Directory of Open Access Journals (Sweden)

    Saba Jabar Neama Al-Khafaji

    2015-11-01

    Full Text Available The approach of greening existing buildings, is an urgent necessity, because the greening operation provides the speed and optimal efficiency in the environmental performance, as well as keeping up with the global green architecture revolution. Therefore, greening existing buildings in Iraq is important for trends towards renewable energies, because of what the country went through economic conditions and crises and wars which kept the country away from what took place globally in this issue. The research problem is: insufficient knowledge about the importance and the mechanism of the greening of existing buildings, including its environmental and economic dimensions, by rationalization of energy consumption and preserving the environment. The research objective is: clarifying the importance of greening existing buildings environmentally and economically, providing a virtual experience for greening the presidency building of Baghdad University, through advanced computer program. The main conclusions is: there is difference representing by reducing the disbursed thermal loads amount for cooling in summer and heating in winter through the use of computerized program (DesignBuilder and that after the implementation of greening operations on the building envelope, which confirms its effectiveness in raising the energy performance efficiency inside the building. Hence, the importance of the application of greening existing buildings approach in Iraq, to bring back Iraqi architecture to environmental and local track proper.

  1. Operation of buildings: Energy supply and energy conservation measures

    Energy Technology Data Exchange (ETDEWEB)

    Kraft, H

    1985-01-01

    Energy saving in public administration. A list-like collection of the measures to monitor the consumption, the measures of saving energy at existing buildings, new systems and by new techniques. Examples with figures for the savings achieved in the region of Marburg-Biedenkopf (Hesse). Guidelines are set up which are mainly based on energy saving, heat recovery, use of new technologies and renewable energy sources, fluidized-bed combustion also in smaller plants of ca. 2 MW, waste management separating wastes into burnable/unburnable, information of the public administration and the people and the setting up of energy concepts. (PJH).

  2. Protecting buildings from a biological or chemical attack: Actions to take before or during a release

    Energy Technology Data Exchange (ETDEWEB)

    Price, Phillip N.; Sohn, Michael D.; Gadgil, Ashok J.; Delp, William W.; Lorenzetti, David M.; Finlayson, Elizabeth U.; Thatcher, Tracy L.; Sextro, Richard G.; Derby, Elisabeth A.; Jarvis, Sondra A.

    2003-01-29

    This report presents advice on how to operate a building to reduce casualties from a biological or chemical attack, as well as potential changes to the building (e.g. the design of the ventilation system) that could make it more secure. It also documents the assumptions and reasoning behind the advice. The particular circumstances of any attack, such as the ventilation system design, building occupancy, agent type, source strength and location, and so on, may differ from the assumptions made here, in which case actions other than our recommendations may be required; we hope that by understanding the rationale behind the advice, building operators can modify it as required for their circumstances. The advice was prepared by members of the Airflow and Pollutant Transport Group, which is part of the Indoor Environment Department at the Lawrence Berkeley National Laboratory. The group's expertise in this area includes: tracer-gas measurements of airflows in buildings (Sextro, Thatcher); design and operation of commercial building ventilation systems (Delp); modeling and analysis of airflow and tracer gas transport in large indoor spaces (Finlayson, Gadgil, Price); modeling of gas releases in multi-zone buildings (Sohn, Lorenzetti, Finlayson, Sextro); and occupational health and safety experience related to building design and operation (Sextro, Delp). This report is concerned only with building design and operation; it is not a how-to manual for emergency response. Many important emergency response topics are not covered here, including crowd control, medical treatment, evidence gathering, decontamination methods, and rescue gear.

  3. 76 FR 30937 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2011-05-27

    ... and to Areas within and Adjacent to Wildland Urban Interface near Tennant, Goosenest Ranger District... land Use Development in the Specific Plan Area, City of Folsom, Sacramento County, CA, Review Period... 2004 FEIS, Ashland Ranger District, Rogue River National Forest and Scott River Ranger District...

  4. Annual Report 1990-1991

    International Nuclear Information System (INIS)

    1991-01-01

    The report outlines the Office of Supervising Scientist (OSS) activities for the period 1 July 1990 to 30 June 1991. Relations between the OSS, the Northern Territory authorities and the mining company have improved over the past year though there has been non-agreement over some technical issues such as the need for, and the effectiveness of, a seepage surveillance system, and the requirement for collection of seepage from the Ranger tailings dam. OSS still has misgivings about the lack of precision in wording in places in the Ranger Authorization and in approvals issued to the companies. Issues connected with the protection of people and the environment from uranium mining in the Region can be complex, and their proper examination can require access to extensive data and detailed information. It is reported that the mining companies have built up, over the years, strong environment programs and a large body of data. Regulatory action has ensured that the both Nabarlek and Ranger, water Management and control systems have been operated to restrict the quantities of contaminants dispersed to the environment. To date, the contaminants released have been at levels which could be assimilated without causing undesirable effects to the wider environment. The future environmental challenges will be to restore the Nabarlek mine site to an acceptable condition and to ensure that contaminant dispersal does not continue to increase at Ranger. 15 tabs., 21 figs

  5. Automate Your Physical Plant Using the Building Block Approach.

    Science.gov (United States)

    Michaelson, Matt

    1998-01-01

    Illustrates how Mount Saint Vincent University (Halifax), by upgrading the control and monitoring of one building or section of the school at a time, could produce savings in energy and operating costs and improve the environment. Explains a gradual, "building block" approach to facility automation that provides flexibility without a…

  6. Forward scatter radar for detection of moving people inside buildings

    NARCIS (Netherlands)

    Wit, J.J.M. de; Rossum, W.L. van

    2017-01-01

    Through-wall radar offers capabilities that allow an important contribution to inside-building awareness, such as target detection and tracking. However, reliable radar tracking of people inside a building is not a trivial task. In monostatic operation, radar measures the backscatter from people

  7. Integrating advanced facades into high performance buildings

    International Nuclear Information System (INIS)

    Selkowitz, Stephen E.

    2001-01-01

    Glass is a remarkable material but its functionality is significantly enhanced when it is processed or altered to provide added intrinsic capabilities. The overall performance of glass elements in a building can be further enhanced when they are designed to be part of a complete facade system. Finally the facade system delivers the greatest performance to the building owner and occupants when it becomes an essential element of a fully integrated building design. This presentation examines the growing interest in incorporating advanced glazing elements into more comprehensive facade and building systems in a manner that increases comfort, productivity and amenity for occupants, reduces operating costs for building owners, and contributes to improving the health of the planet by reducing overall energy use and negative environmental impacts. We explore the role of glazing systems in dynamic and responsive facades that provide the following functionality: Enhanced sun protection and cooling load control while improving thermal comfort and providing most of the light needed with daylighting; Enhanced air quality and reduced cooling loads using natural ventilation schemes employing the facade as an active air control element; Reduced operating costs by minimizing lighting, cooling and heating energy use by optimizing the daylighting-thermal tradeoffs; Net positive contributions to the energy balance of the building using integrated photovoltaic systems; Improved indoor environments leading to enhanced occupant health, comfort and performance. In addressing these issues facade system solutions must, of course, respect the constraints of latitude, location, solar orientation, acoustics, earthquake and fire safety, etc. Since climate and occupant needs are dynamic variables, in a high performance building the facade solution have the capacity to respond and adapt to these variable exterior conditions and to changing occupant needs. This responsive performance capability

  8. RIVER CORRIDOR BUILDINGS 324 and 327 CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.; SMITH, B.A.

    2006-01-01

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D and D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km 2 (1 mi 2 )300 Area comprises only a small part of the 1517 km 2 (586 mi 2 ) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D and D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Project for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building

  9. Building server capabilities in China

    DEFF Research Database (Denmark)

    Adeyemi, Oluseyi; Slepniov, Dmitrij; Wæhrens, Brian Vejrum

    2012-01-01

    The purpose of this paper is to further our understanding of multinational companies building server capabilities in China. The paper is based on the cases of two western companies with operations in China. The findings highlight a number of common patterns in the 1) managerial challenges related...

  10. Overview of green building rating tools

    CSIR Research Space (South Africa)

    Sebake, TN

    2009-02-01

    Full Text Available ; Cooper, 1999; Kohler, 1999; and Finnveden and Momberg, 2005). In response to this concern of reducing environmental impact of the design and operation of buildings, many researchers have developed methods for measuring environmental performance...

  11. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    1980-09-01

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions [sr

  12. National Ignition Facility subsystem design requirements laser and target area building (LTAB) SSDR 1.2.2.1

    International Nuclear Information System (INIS)

    Kempel, P.; Hands, J.

    1996-01-01

    This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements for the conventional building systems and subsystems of the Laser and Target Area Building (LTAB), including those that house and support the operation of high-energy laser equipment and the operational flow of personnel and materials throughout the facility. This SSDR addresses the following subsystems associated with the LTAB: Building structural systems for the Target Bay, Switchyards, Diagnostic Building, Decontamination Area, Laser Bays, Capacitor Bays and Operations Support Area, and the necessary space associated with building-support equipment; Architectural building features associated with housing the space and with the operational cleanliness of the functional operation of the facilities; Heating, Ventilating, and Air Conditioning (HVAC) systems for maintaining a clean and thermally stable ambient environment within the facilities; Plumbing systems that provide potable water and sanitary facilities for the occupants, plus stormwater drainage for transporting rainwater; Fire Protection systems that guard against fire damage to the facilities and their contents; Material handling systems for transporting personnel and heavy materials within the building areas; Mechanical process piping systems for liquids and gases that provide cooling and other service to experimental laser equipment and components; Electrical power and grounding systems that provide service and standby power to building and experimental equipment, including lighting distribution and communications systems for the facilities; Instrumentation and control systems that ensure the safe operation of conventional facilities systems, such as those listed above. Detailed requirements for building subsystems that are not addressed in this document (such as specific sizes, locations, or capacities) are included in detail-level NIP Project Interface Control Documents (ICDS)

  13. Building energy efficiency in different climates

    International Nuclear Information System (INIS)

    Lam, Joseph C.; Wan, Kevin K.W.; Tsang, C.L.; Yang Liu

    2008-01-01

    Energy simulation was conducted for office buildings in the five major climate zones - severe cold, cold, hot summer and cold winter, mild, and hot summer and warm winter - in China using DOE-2.1E. The primary aim was to investigate the thermal and energy performance of office buildings with centralised heating, ventilation and air conditioning plants in the major climatic zones in China. The computed results were analysed in three aspects - heating load, cooling load and the corresponding building energy consumption. The building peak monthly heating load varied from 142 MW h (1033 MW h cooling) in Hong Kong to 447 MW h (832 MW h cooling) in Harbin. It was also found that passive solar designs could have large energy savings potential in the severe cold and cold climates. In Harbin, the window solar component helped lower the annual building heating load by 650 MW h. Internal loads (lighting and office equipment) and part load operations of fans and pumps also played a significant role in the overall building energy efficiency. This paper presents the work, its findings and energy efficiency implications

  14. A neural network controller for hydronic heating systems of solar buildings.

    Science.gov (United States)

    Argiriou, Athanassios A; Bellas-Velidis, Ioannis; Kummert, Michaël; André, Philippe

    2004-04-01

    An artificial neural network (ANN)-based controller for hydronic heating plants of buildings is presented. The controller has forecasting capabilities: it includes a meteorological module, forecasting the ambient temperature and solar irradiance, an indoor temperature predictor module, a supply temperature predictor module and an optimizing module for the water supply temperature. All ANN modules are based on the Feed Forward Back Propagation (FFBP) model. The operation of the controller has been tested experimentally, on a real-scale office building during real operating conditions. The operation results were compared to those of a conventional controller. The performance was also assessed via numerical simulation. The detailed thermal simulation tool for solar systems and buildings TRNSYS was used. Both experimental and numerical results showed that the expected percentage of energy savings with respect to a conventional controller is of about 15% under North European weather conditions.

  15. Correlation between temperature satisfaction and unsolicited complaint rates in commercial buildings.

    Science.gov (United States)

    Wang, D; Federspiel, C C; Arens, E

    2005-02-01

    This paper analyzes the relation between temperature satisfaction ratings expressed on a questionnaire and unsolicited complaint rates recorded in a maintenance database. The key findings are as follows: (i) the satisfaction ratings and complaint rates are negatively correlated with a moderate magnitude (r(s) = -0.31 to -0.36), and the correlation is statistically significant (P = 0.01-0.005), and (ii) the percent dissatisfied with temperature and the complaint rate are positively correlated with moderate magnitude (r(s) = 0.31-0.36), and the correlation is statistically significant (P = 0.01-0.004). Both data sets contain 'real-world' measures of temperature satisfaction, with the complaints contributing directly to the cost of operations and maintenance. The relationship between two validates a new method of assessing the economic cost of thermal discomfort in commercial buildings. Complaints in commercial buildings indicate occupants' dissatisfaction to their environments. It not only deteriorates occupants' performance and organization productivity, but also increases building maintenance and operating cost. Nailing economic consequences of complaints will enable monetary comparison of discomfort cost with building and operating costs. This comparison may be desirable for building owners and tenants to make well-informed decisions on construction, rental, and retrofit. It may also be used to evaluate complaint diagnostic and eliminating techniques.

  16. Building Energy and Cost Performance: An Analysis of Thirty Melbourne Case Studies

    Directory of Open Access Journals (Sweden)

    Yu Lay Langston

    2012-11-01

    Full Text Available This study investigates the energy and cost performance of thirty recent buildings in Melbourne, Australia. Commonly, building design decisions are based on issues pertaining to construction cost, and consideration of energy performance is made only within the context of the initial project budget. Even where energy is elevated to more importance, operating energy is seen as the focus and embodied energy is nearly always ignored. For the first time, a large sample of buildings has been assembled and analyzed to improve the understanding of both energy and cost performance over their full life cycle, which formed the basis of a wider doctoral study into the inherent relationship between energy and cost. The aim of this paper is to report on typical values for embodied energy, operating energy, capital cost and operating cost per square metre for a range of building functional types investigated in this research. The conclusion is that energy and cost have quite different profiles across projects, and yet the mean GJ/m2 or cost/m2 have relatively low coefficients of variation and therefore may be useful as benchmarks of typical building performance.  

  17. Transaction-Based Building Controls Framework, Volume 1: Reference Guide

    Energy Technology Data Exchange (ETDEWEB)

    Somasundaram, Sriram [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Pratt, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Akyol, Bora A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Fernandez, Nicholas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Foster, Nikolas AF [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Katipamula, Srinivas [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mayhorn, Ebony T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Somani, Abhishek [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Steckley, Andrew C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Taylor, Zachary T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-12-01

    This document proposes a framework concept to achieve the objectives of raising buildings’ efficiency and energy savings potential benefitting building owners and operators. We call it a transaction-based framework, wherein mutually-beneficial and cost-effective market-based transactions can be enabled between multiple players across different domains. Transaction-based building controls are one part of the transactional energy framework. While these controls realize benefits by enabling automatic, market-based intra-building efficiency optimizations, the transactional energy framework provides similar benefits using the same market -based structure, yet on a larger scale and beyond just buildings, to the society at large.

  18. Model calibration for building energy efficiency simulation

    International Nuclear Information System (INIS)

    Mustafaraj, Giorgio; Marini, Dashamir; Costa, Andrea; Keane, Marcus

    2014-01-01

    Highlights: • Developing a 3D model relating to building architecture, occupancy and HVAC operation. • Two calibration stages developed, final model providing accurate results. • Using an onsite weather station for generating the weather data file in EnergyPlus. • Predicting thermal behaviour of underfloor heating, heat pump and natural ventilation. • Monthly energy saving opportunities related to heat pump of 20–27% was identified. - Abstract: This research work deals with an Environmental Research Institute (ERI) building where an underfloor heating system and natural ventilation are the main systems used to maintain comfort condition throughout 80% of the building areas. Firstly, this work involved developing a 3D model relating to building architecture, occupancy and HVAC operation. Secondly, the calibration methodology, which consists of two levels, was then applied in order to insure accuracy and reduce the likelihood of errors. To further improve the accuracy of calibration a historical weather data file related to year 2011, was created from the on-site local weather station of ERI building. After applying the second level of calibration process, the values of Mean bias Error (MBE) and Cumulative Variation of Root Mean Squared Error (CV(RMSE)) on hourly based analysis for heat pump electricity consumption varied within the following ranges: (MBE) hourly from −5.6% to 7.5% and CV(RMSE) hourly from 7.3% to 25.1%. Finally, the building was simulated with EnergyPlus to identify further possibilities of energy savings supplied by a water to water heat pump to underfloor heating system. It found that electricity consumption savings from the heat pump can vary between 20% and 27% on monthly bases

  19. The Global Modeling Test Bed - Building a New National Capability for Advancing Operational Global Modeling in the United States.

    Science.gov (United States)

    Toepfer, F.; Cortinas, J. V., Jr.; Kuo, W.; Tallapragada, V.; Stajner, I.; Nance, L. B.; Kelleher, K. E.; Firl, G.; Bernardet, L.

    2017-12-01

    NOAA develops, operates, and maintains an operational global modeling capability for weather, sub seasonal and seasonal prediction for the protection of life and property and fostering the US economy. In order to substantially improve the overall performance and accelerate advancements of the operational modeling suite, NOAA is partnering with NCAR to design and build the Global Modeling Test Bed (GMTB). The GMTB has been established to provide a platform and a capability for researchers to contribute to the advancement primarily through the development of physical parameterizations needed to improve operational NWP. The strategy to achieve this goal relies on effectively leveraging global expertise through a modern collaborative software development framework. This framework consists of a repository of vetted and supported physical parameterizations known as the Common Community Physics Package (CCPP), a common well-documented interface known as the Interoperable Physics Driver (IPD) for combining schemes into suites and for their configuration and connection to dynamic cores, and an open evidence-based governance process for managing the development and evolution of CCPP. In addition, a physics test harness designed to work within this framework has been established in order to facilitate easier like-to-like comparison of physics advancements. This paper will present an overview of the design of the CCPP and test platform. Additionally, an overview of potential new opportunities of how physics developers can engage in the process, from implementing code for CCPP/IPD compliance to testing their development within an operational-like software environment, will be presented. In addition, insight will be given as to how development gets elevated to CPPP-supported status, the pre-cursor to broad availability and use within operational NWP. An overview of how the GMTB can be expanded to support other global or regional modeling capabilities will also be presented.

  20. Environmental management and monitoring for education building development

    Science.gov (United States)

    Masri, R. M.

    2018-05-01

    The purpose of research were (1) a conceptual, functional model designed and implementation for environmental management and monitoring for education building development, (2) standard operational procedure made for management and monitoring for education building development, (3) assessed physic-chemical, biological, social-economic environmental components so that fulfilling sustainable development, (4) environmental management and monitoring program made for decreasing negative and increasing positive impact in education building development activities. Descriptive method is used for the research. Cibiru UPI Campus, Bandung, West Java, Indonesia was study location. The research was conducted on July 2016 to January 2017. Spatial and activities analysis were used to assess physic-chemical, biological, social-economic environmental components. Environmental management and monitoring for education building development could be decreasing water, air, soil pollution and environmental degradation in education building development activities.

  1. Development of whole-building energy design targets for commercial buildings: Phase 1, Planning: Volume 2, Technical report

    Energy Technology Data Exchange (ETDEWEB)

    Crawley, D.B.; Briggs, R.S.; Jones, J.W.; Seaton, W.W.; Kaufman, J.E.; Deringer, J.J.; Kennett, E.W.

    1987-08-01

    This is the second volume of the Phase 1 report and discusses the 10 tasks performed in Phase 1. The objective of this research is to develop a methodology for setting energy design targets to provide voluntary guidelines for the buildings industry. The whole-building energy targets project is being conducted at the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) to encourage the construction of energy-efficient buildings by informing designers and owners about cost-effective goals for energy use in new commercial buildings. The outcome of this research will be a flexible methodology for setting such targets. The tasks are listed and discussed in this report as follows: Task 1 - Develop Detailed Project Goals and Objectives; Task 2 - Establish Buildings-Industry Liaison; Task 3 - Develop Approaches to the Energy Targets Model, Building Operations, and Climate; Task 4 - Develop an Approach for Treating Economic Considerations; Task 5 - Develop an Approach for Treating Energy Sources; Task 6 - Collect Energy-Use Data; Task 7 - Survey Energy Expert Opinion; Task 8 - Evaluation Procedure Specification and Integration; Task 9 - Phase 1 Report Development; and Task 10 - Phase 1 Review Planning.

  2. Dual certification for bank skyscrapers. A company headquarter gets a Green Building; Duale Zertifizierung fuer Bank-Tuerme. Eine Konzernzentrale wird zum Green Building

    Energy Technology Data Exchange (ETDEWEB)

    Luft, Christian; Bauer, Michael [Drees und Sommer Advanced Building Technologies GmbH, Stuttgart (Germany)

    2011-07-01

    Fire protection regulations force the Deutsche Bank AG (Frankfurt/Main, Federal Republic of Germany) to extensive reorganization measures in order to continuously operate their buildings. As part of a complete renovation, Deutsche Bank AG has stipulated a modern, innovative and sustainable example. This is confirmed by the Green Building Certification with the US american label LEED registered in Platinum as well as the German sustainability certificate of the Germain Sustainable Building Council (Stuttgart, Federal Republic of Germany) in gold.

  3. Biomimicry of Palm Tree Leaves Form and Pattern on Building Form

    Directory of Open Access Journals (Sweden)

    Agus Salim N.A.

    2014-01-01

    Full Text Available This article is a study on biomimicry of palm tree towards a building form. It is to find a suitable form and pattern that can be applied to building shell to ease building maintenance operation beside to enhance the aesthetic value of a building architecture. The research has been carried out by observation and modeling on some various species of palm tree’s patterns and forms. The result expectation can be found at the end of this research by producing the best pattern of palm tree that can be adapted to building envelop as the whole form of a building.

  4. Dissipation of heat from building integrated PV

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, C.M.L.

    2001-07-01

    The objectives of the project were to investigate methods for improving heat transfer and the reflection of heat from PV modules in building integrated situations and to develop the design of a building integrated PV element with improved heat transfer characteristics, with the aim of reducing the operating temperature of the PV cells. The prototypes developed for improving heat transfer have only shown small reductions in the PV cell operating temperature and these results have not been fully quantified due to problems associated with experimental testing. The improvement in the overall electrical performance of PV modules operating at lower temperatures is consequently even smaller. As a result, none of the prototypes can be considered to be economically viable. Based upon the theoretical and experimental results of this work, it is the recommendation of this project that no further work be conducted in improving BIPV performance through improved heat transfer of BIPV. (Author)

  5. Building Abelian Functions with Generalised Baker-Hirota Operators

    Directory of Open Access Journals (Sweden)

    Matthew England

    2012-06-01

    Full Text Available We present a new systematic method to construct Abelian functions on Jacobian varieties of plane, algebraic curves. The main tool used is a symmetric generalisation of the bilinear operator defined in the work of Baker and Hirota. We give explicit formulae for the multiple applications of the operators, use them to define infinite sequences of Abelian functions of a prescribed pole structure and deduce the key properties of these functions. We apply the theory on the two canonical curves of genus three, presenting new explicit examples of vector space bases of Abelian functions. These reveal previously unseen similarities between the theories of functions associated to curves of the same genus.

  6. Recent developments in Australia's uranium mining industry

    International Nuclear Information System (INIS)

    McKay, A.D.

    2001-01-01

    Uranium is produced at two mining/milling operations in Australia - Ranger in the Alligator Rivers Region of the Northern Territory, and Olympic Dam in South Australia. In 1996, Ranger produced 4138 tonnes (t) U 3 O 8 from stockpiled ore mined from Ranger No. 1 Orebody. The capacity of the Ranger mill is being expanded to 5000 tonnes per annum (tpa) U 3 O 8 to coincide with the commencement of mining from No. 3 Orebody in mid-1997. The Olympic Dam copper-uranium-gold-silver deposit is the world's largest deposit of low cost uranium. The operation currently has an annual production of 85,000 t copper, 1700 t U 3 O 8 and associated gold and silver. WMC Ltd proposes to expand annual production to 200 000 t copper and approximately 4600 t U 3 O 8 by end of 1999. The environmental impact of the expansion is being assessed jointly by both Commonwealth and South Australian Governments. A draft Environmental Impact Statement (EIS) was released in May. Since its election in March 1996, the Liberal/National Party Coalition Government has made a number of changes to the Commonwealth Government's policies relating to uranium mining, including removal of the former Government's 'three mines' policy, and relaxation of the guidelines for foreign investment in Australian uranium mines. These changes, together with an improved outlook for the uranium market, have resulted in proposals to develop new mines at Jabiluka (Northern Territory), Kintyre (Western Australia) and Beverley (South Australia). Energy Resources of Australia Ltd proposes to develop an underground mine at Jabiluka with the ore to be processed at Ranger mill. Initial production will be 1800 tpa U 3 O 8 which will increase to 4000 tpa U 3 O 8 by the 14th year. The draft EIS was released for public comment in October 1996, and the final EIS is to be released in June 1997. Canning Resources Ltd proposes to mine the Kintyre deposit by open cut methods commencing in 1999 with an annual production of 1200 tpa U 3 O 8

  7. Animal-assisted therapy: paws with a cause.

    Science.gov (United States)

    Ernst, Lorraine S

    2013-03-01

    Ranger, the cardiac Pet Therapy standard poodle, was called upon by a family member to visit Mrs. M, a patient hospitalized for worsening heart failure. Although short of breath, Mrs. M started talking to Ranger as he rested quietly on the bed beside her. She told him in a soft voice that she knew she was sick but "you, my friend, give me strength and courage." Mrs. M died 1 week later. Soon after, the family stated in a survey that the interaction between Mrs. M and Ranger was very important to Mrs. M and that she had looked forward to her visits with Ranger. Mrs. M indicated to her family that Ranger made her feel calm and protected as she faced her illness.

  8. Real-time supervision of building HVAC system performance

    Energy Technology Data Exchange (ETDEWEB)

    Djuric, Natasa

    2008-07-01

    This thesis presents techniques for improving building HVAC system performance in existing buildings generated using simulation-based tools and real data. Therefore, one of the aims has been to research the needs and possibilities to assess and improve building HVAC system performance. In addition, this thesis aims at an advanced utilization of building energy management system (BEMS) and the provision of useful information to building operators using simulation tools. Buildings are becoming more complex systems with many elements, while BEMS provide many data about the building systems. There are, however, many faults and issues in building performance, but there are legislative and cost-benefit forces induced by energy savings. Therefore, both BEMS and the computer-based tools have to be utilized more efficiently to improve building performance. The thesis consists of four main parts that can be read separately. The first part explains the term commissioning and the commissioning tool work principal based on literature reviews. The second part presents practical experiences and issues introduced through the work on this study. The third part deals with the computer-based tools application in design and operation. This part is divided into two chapters. The first deals with improvement in the design, and the second deals with the improvement in the control strategies. The last part of the thesis gives several rules for fault diagnosis developed using simulation tools. In addition, this part aims at the practical explanation of the faults in the building HVAC systems. The practical background for the thesis was obtained though two surveys. The first survey was carried out with the aim to find the commissioning targets in Norwegian building facilities. In that way, an overview of the most typical buildings, HVAC equipment, and their related problems was obtained. An on-site survey was carried out on an example building, which was beneficial for introducing the

  9. A real-time radiation mapping system

    International Nuclear Information System (INIS)

    Scoggins, W.A.; VanEtten, D.M.

    1988-01-01

    A prototype of a real-time radiation mapping system, Ranger, was developed to respond to an accident involving the release of plutonium for the Department of Energy's Accident Response Group. In 1987 Ranger demonstrated that it can provide an efficient method of monitoring large areas of land for radioactive contamination. With the experience gained from the operation of the prototype, the external computer and software are being upgraded in order to obtain a fully operational system. The new system uses the prototype's commercially available line-of-sight microwave system for determining position and the same radiation detection instruments. The data obtained from the radiation detection instrument(s) are linked back to the external computer along with the relative position of the measurement through the ranging system. The data are displayed on a gridded map as colored circles and permanently stored in real-time. The different colors represent different contamination levels. Contours can be drawn using the permanently stored data. 4 figs

  10. Impacts of building information modeling on facility maintenance management

    Energy Technology Data Exchange (ETDEWEB)

    Ahamed, Shafee; Neelamkavil, Joseph; Canas, Roberto [Centre for Computer-assisted Construction Technologies, National Research Council of Canada, London, Ontario (Canada)

    2010-07-01

    Building information modeling (BIM) is a digital representation of the physical and functional properties of a building; it has been used by construction professionals for a long time and stakeholders are now using it in different aspects of the building lifecycle. This paper intends to present how BIM impacts the construction industry and how it can be used for facility maintenance management. The maintenance and operations of buildings are in most cases still managed through the use of drawings and spreadsheets although life cycle costs of a building are significantly higher than initial investment costs; thus, the use of BIM could help in achieving a higher efficiency and so important benefits. This study is part of an ongoing research project, the nD modeling project, which aims at predicting building energy consumption with better accuracy.

  11. Development of national standards related to the integrated safety and security of high-rise buildings

    Science.gov (United States)

    Voskresenskaya, Elena; Vorona-Slivinskaya, Lubov

    2018-03-01

    The article considers the issues of developing national standards for high-rise construction. The system of standards should provide industrial, operational, economic and terrorist safety of high-rise buildings and facilities. Modern standards of high-rise construction should set the rules for designing engineering systems of high-rise buildings, which will ensure the integrated security of buildings, increase their energy efficiency and reduce the consumption of resources in construction and operation.

  12. The Army's Role in Nation Building

    National Research Council Canada - National Science Library

    Edmonds, Mark L

    2009-01-01

    ... should be and how to execute this task. The tasks associated with nation building are part of the Army's core competencies under the auspices of 'Stability Operations', and are now cited in doctrine in the recently published Field Manual 3-07...

  13. The homeostasis solution – Mechanical homeostasis in architecturally homeostatic buildings

    International Nuclear Information System (INIS)

    Wang, Lin-Shu; Ma, Peizheng

    2016-01-01

    Highlights: • Architectural homeostatic buildings (AHBs) make sense because of the laws of physics. • However, high efficiency can be obtained only with AHBs and equipment considered as systems. • Mechanical homeostasis facilitates AHB-equipment system synergy with heat extraction. • Entropically speaking a building needs neither energy nor a fixed amount of heat, but its homeostatic existence. • Homeostatic buildings can reduce building energy consumption from 80% to 90%. - Abstract: We already know, for energy-saving potential, the necessary architectural features in well-designed buildings: high performance building envelope, sufficient interior thermal mass, and hydronic-network activated radiant surfaces for cooling and heating. Buildings with these features may be referred to as architecturally homeostatic buildings (AHBs); such a building-system is thermally semi-autonomous in the sense that its temperature variation stays within a certain range even without conditioning equipment, and, with conditioning equipment in operation, its thermal regulation is handled by its hydronic heat-distribution-network for controlling the temperature level of the building. At the present time conventional HVAC equipment is used for maintaining the heat-distribution-network: this arrangement, however, has resulted in great energy saving only for AHBs with accessible natural water bodies. In operation of general AHBs, a case is made here for a new kind of mechanical equipment having the attribute of mechanical homeostasis (MH). MH is a new energy transformation concept in a triadic framework. Superlative energy efficiency is predicted as a result of combined improvements in higher triadCOPs and lower total (inducted + removed) heat rates—evincing existence of synergy in architectural and mechanical homeostasis, which together will be referred to as the homeostasis solution.

  14. Commercial Building Energy Asset Score System: Program Overview and Technical Protocol (Version 1.0)

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Na; Gorrissen, Willy J.

    2013-01-11

    The U.S. Department of Energy (DOE) is developing a national voluntary energy asset score system that includes an energy asset score tool to help building owners evaluate their buildings with respect to the score system. The goal of the energy asset score system is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system will allow building owners and managers to compare their building infrastructure against peers and track building upgrade progress over time. The system can also help other building stakeholders (e.g., building operators, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from their operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset score tool. This report also describes alternative methods that were considered prior to developing the current approach. Finally, this report describes a few features of the program where alternative approaches are still under evaluation.

  15. OPERATING STABILITY OF MINERAL WOOL PRODUCTS

    Directory of Open Access Journals (Sweden)

    Perfilov Vladimir Aleksandrovich

    2016-03-01

    Full Text Available Creating an effective insulation envelope of the building is possible only using high-quality materials, preserving their characteristics both in the early stages of operation, and for the whole billing period. It is an important opportunity to assess the thermal insulation properties and predict its changes over time directly in the conditions of the construction site. The products based on mineral fibers (rock and glass wool, basalt fiber are the most widely used type of insulating materials in the domestic construction. Therefore, the operational stability valuation methods must be primarily created for this group of products. The methodology for assessing the thermal insulation properties includes two main components: testing equipment and methodology for assessing the operational stability. The authors tested the methodology of the accelerated testing and prediction of durability for mineral wool products of laminated, corrugated and volume-oriented structures. The test results give good convergence with the methods recommended by the building regulations. Application of thermal insulation materials are an effective way to form the thermal envelope of the building, reducing energy costs and increasing the durability of building structures. The material properties are determined by their structure, which is formed during the technological impacts.

  16. United States Army Special Operations Forces and Building Enduring Partner Enabler Capacity in Operation Enduring Freedom-Philippines

    Science.gov (United States)

    2014-05-22

    Monograph Director Christopher Marsh, Ph.D. , Seminar Leader Christopher T. Drew, COL, EN , Director, School of Advanced Military...56Robert Nolan , “Terror in the Philippines,” Foreign Policy Association Newsletter, 6 March 2003; Charles H. Briscoe...2007. Moroney, Jennifer, Beth Grill, Joe Hogler, Lianne Kennedy-Boudali, and Christopher Paul. How Successful Are US Efforts to Build Capacity in

  17. Significance of Building Maintenance Management Systems towards Sustainable Development

    Directory of Open Access Journals (Sweden)

    M.A. Othuman Mydin

    2014-05-01

    Full Text Available Building maintenance management is an organized and effective system of maintenance operations which is set up to deal with problems related to the upkeep of a building. Its goal, aside from locating and remedying a building’s deficiencies, is to effectively minimize the overall costs of maintenance and is also an effort to maximize the gain and benefits from the savings. There are a few factors that influence decisions to undertake maintenance work. The principal goal of maintenance is to protect a building in the early stage of issues as they arise. Some major reasons for maintaining a building include retaining its reputation and value of investments, maintaining the building in a condition which allows it to accomplish its purpose, and presenting a good outer shell. This paper will review and discuss some of the major elements of building maintenance towards achieving sustainable buildings.

  18. DOE/KEURP Site Operator Program year 5 first quarter report, July 1-- September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy` s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU now has two electric cars. Both are electric conversion vehicles from Soleq Corporation out of Chicago. KSU in conjunction with KEURP also initiated procurement for the purchase of four (4) Chevy S-10 pickup trucks. Since the supplier, GE-Spartan, canceled its effort concerning the production of vehicles other appropriate sources were sought. Today, K-State and the Kansas Utilities are working with Troy Design and Manufacturing (TDM), Redford, Michigan. TDM is working with Ford Motor Company and expects to become the first certified electric vehicle Quality Vehicle Modifier (QVM). Kansas State has entered into an agreement to assist TDM in supporting the infrastructure and technical manual development for these vehicles. The Soleq EVcorts have not been signed to illustrate to the public that it is an electric vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged. As soon as TDM`s Ford Ranger electric vehicles are delivered they will be used throughout the state by utility companies that are participating with K-State`s Site Operator Program.

  19. Distribution Locational Real-Time Pricing Based Smart Building Control and Management

    Energy Technology Data Exchange (ETDEWEB)

    Hao, Jun; Dai, Xiaoxiao; Zhang, Yingchen; Zhang, Jun; Gao, Wenzhong

    2016-11-21

    This paper proposes an real-virtual parallel computing scheme for smart building operations aiming at augmenting overall social welfare. The University of Denver's campus power grid and Ritchie fitness center is used for demonstrating the proposed approach. An artificial virtual system is built in parallel to the real physical system to evaluate the overall social cost of the building operation based on the social science based working productivity model, numerical experiment based building energy consumption model and the power system based real-time pricing mechanism. Through interactive feedback exchanged between the real and virtual system, enlarged social welfare, including monetary cost reduction and energy saving, as well as working productivity improvements, can be achieved.

  20. Performance evaluation of the Solar Building Test Facility

    Science.gov (United States)

    Jensen, R. N.

    1981-01-01

    The general performance of the NASA Solar Building Test Facility (SBTF) and its subsystems and components over a four year operational period is discussed, and data are provided for a typical one year period. The facility consists of a 4645 sq office building modified to accept solar heated water for operation of an absorption air conditioner and a baseboard heating system. An adjoining 1176 sq solar flat plate collector field with a 114 cu tank provides the solar heated water. The solar system provided 57 percent of the energy required for heating and cooling on an annual basis. The average efficiency of the solar collectors was 26 percent over a one year period.