  1. Regulations for RA reactor operation

    International Nuclear Information System (INIS)

    1980-09-01

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions [sr

  2. RA reactor operation and maintenance

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-02-01

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air

  3. Regulations for RA reactor operation; Propisi nuklearnog reaktora 'RA'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-09-15

    Regulations for RA reactor operation are written in accordance with the legal regulations defined by the Law about radiation protection and related legal acts, as well as technical standards according to the IAEA recommendations. The contents of this book include: fundamental data about the reactor; legal regulations for reactor operation; organizational scheme for reactor operation; general and detailed instructions for operation, behaviour in the reactor building, performing experiments; operating rules for operation under steady state and accidental conditions. [Serbo-Croat] Propisi o radu nuklearnog reaktora RA pisani su tako da svi zakonski propisi definisani 'Zakonom o zastiti od jonizujuceg zracenja' i pratecim propisima (devet pravilnika) kao i tehnicke norme prema preporukama MAAE budu postovani u punoj meri pri radu reaktora. Sadrzaj ove knjige obuhvata: osnovne podatke o reaktoru; zakonske propise; organizaciju rada reaktora RA; opste propise o rezimu rada, kretanju u zgradi reaktora, izvodjenju eksperimenata; pogonske propise za rad u normalnom rezimu i u slucaju udesa.

  4. RA reactor operation and maintenance; Pogon i odrzavanje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This volume includes the final report on RA reactor operation and utilization of the experimental facilities in 1962, detailed analysis of the system for heavy water distillation and calibration of the system for measuring the activity of the air.

  5. Regulations and instructions for RA reactor operation

    International Nuclear Information System (INIS)

    1989-01-01

    This regulatory guide consists of following 4 chapters: Description of the RA reactor, organization scheme, regulations for performing experiments; Regulations for staff on duty; Instructions for operating the vacuum systems, heavy water and helium systems; and evacuation in case of accident [sr

  6. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1987-01-01

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction [sr

  7. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  8. RA Reactor; Reaktor RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1978-02-15

    In addition to basic characteristics of the RA reactor, organizational scheme and financial incentives, this document covers describes the state of the reactor components after 18 years of operation, problems concerned with obtaining the licence for operation with 80% fuel, problems of spent fuel storage in the storage pool of the reactor building and the need for renewal of reactor equipment, first of all instrumentation. [Serbo-Croat] Pored osnovnih karakeristika reaktora RA, organizacije rada i finansijskih pokazatelja, razmatra se stanje opreme reaktora nakon 18 godina rada, pitanja dozvole za rad sa 80% obogacenim gorivom, problem skladistenja isluzenog goriva u bazenu zgrade reaktora i potreba za obnavljanjem komponenti opreme, pre svega elektronske.

  9. RA Reactor operation and maintenance (I-IX), Part I

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling

  10. RA Reactor

    International Nuclear Information System (INIS)

    1978-02-01

    In addition to basic characteristics of the RA reactor, organizational scheme and financial incentives, this document covers describes the state of the reactor components after 18 years of operation, problems concerned with obtaining the licence for operation with 80% fuel, problems of spent fuel storage in the storage pool of the reactor building and the need for renewal of reactor equipment, first of all instrumentation [sr

  11. RA Reactor

    International Nuclear Information System (INIS)

    1989-01-01

    This chapter includes the following: General description of the RA reactor, organization of work, responsibilities of leadership and operators team, regulations concerning operation and behaviour in the reactor building, regulations for performing experiments, regulations and instructions for inserting samples into experimental channels [sr

  12. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1986-01-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  13. RA Reactor; Reaktor RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This chapter includes the following: General description of the RA reactor, organization of work, responsibilities of leadership and operators team, regulations concerning operation and behaviour in the reactor building, regulations for performing experiments, regulations and instructions for inserting samples into experimental channels. [Serbo-Croat] Ovo (prvo) poglavlje sadrzi sledece: Opis reaktora RA; semu organizacije rada i rukovodjenja; prava i duznosti direktora i rukovodioca pogona reaktora, propise o rezimu rada i kretanja u zgradi reaktora, propise o izvodjenju eksperimenata, propise o unosenju uzoraka u eksperimentalne kanale reaktora.

  14. RA reactor operation and maintenance in 1996, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1996-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. Since the RA reactor is shutdown since 1984, it is high time for decision making of its future status. Possible solutions for the future status of the RA reactor discussed in this report are: renewal of reactor components for the reactor restart, conservation of the reactor (temporary shutdown) or permanent reactor shutdown. Control and maintenance of the reactor instrumentation and devices was done regularly but dependent on the availability of the spare parts and financial means. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  15. RA research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1985

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1985-01-01

    According to the plan, RA reactor was to be in operation in mid September 1985. But, since the building of the emergency cooling system, nor the reconstruction of the existing special ventilation system were not finished until the end of August reactor was not operated during 1985. During the previous four years reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care, which was cancelled in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981-1984. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks have started: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. IAEA has approved the amount of 1,300,000 US dollars for the renewal of the instrumentation [sr

  16. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1983

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Raickovic, N.; Radivojevic, J.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1983-12-01

    After regular shutdown in November 1982, inspection of the fuel elements from the RA reactor core which was done from December 1982 - February 1983 has shown that there are deposits of aluminium oxides on the surface of the fuel cladding. After restart The RA reactor was operated at power levels from 1.8 - 2 MW, with 80% enriched uranium dioxide fuel elements. It was found that there was no corrosion of the fuel element cladding and that it was not possible to find the cause of surface deposition on the cladding surfaces without further operation. It was decided to purify the heavy water permanently during operation and to increase the heavy water flow by operating two pumps. This procedure was adopted in order to decrease the possibility of corrosion. The Safety committee of the Institute has approved this procedure for operating the RA reactor in 1983. The core was made of 80% enriched fuel, critical experiments were done until June 1983, and after that the operation was continued at power levels up to 2 MW [sr

  17. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1984-12-01

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization

  18. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Milosevic, M.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.

    1981-12-01

    The RA nuclear reactor stopped operation after March 1979 campaign due to appearance of aluminium oxyhydrates deposits on the surface of fuel element claddings. Relevant decisions of the Sanitary inspection body of the Ministry of health and the Director General of the 'Boris Kidric' Institute of nuclear sciences, Vinca, banned further reactor operation until reasons caused aluminium oxyhydrates deposition are investigated and removed to enable regular reactor operation. Until the end of 1979 and during 1980, after a series of analyses and findings that caused cease of reactor operation, all the preparatory actions needed for restart were performed. Due to the fact that there is no emergency cooling system and no appropriate filtering system at the reactor, and according to the new regulations about start up of nuclear facilities, the Sanitary inspection body made a decision about temporary licence for reactor start-up meaning performance of the 'zero experiment' limiting the operating power to 1% of the nominal power. Accordingly the reactor was restarted on January 21 1981. Criticality was reached with the core made of 80% enriched fuel elements only. After the experiment was finished by the end of March a permission was demanded for operation at higher power levels at full power. Taking into account the state of the reactor components the operating licence was issued limiting the power to 2 MW until reconstruction of the ventilation system and construction of the emergency cooling system are fulfilled. Program of testing operation started on September 15 1981 increasing gradually the operating power. Thus the reactor was operated at 2 MW power for 15 days during November and December. The total production achieved in 1981 was 1698 MWh. This enabled isotopes production at the reactor during last two months. Control and maintenance of the reactor components and systems was done regularly and efficiently within limits imposed by availability of spare parts. The

  19. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Badrljica, R.; Majstorovic, D.; Sanovic, V.

    1988-01-01

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues [sr

  20. RA reactor operation and maintenance in 1994, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1994-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  1. RA reactor operation and maintenance in 1989, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Sanovic, V.

    1989-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor [sr

  2. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities

  3. Course of operators of the RA-3 reactor

    International Nuclear Information System (INIS)

    Caligiuri, G.A.

    1983-01-01

    Description of the fundamental principles of the nuclear reactors' control systems. The RA-3 reactor's control and measurement systems are principally described, without setting aside the basic criteria for the design of an appropriate instrumentation for the control of a nuclear reactor, as well as the theory on which the functioning of the several detectors and equipments used in a nuclear instrumentation are based. The main purpose of this course is that of serving, preferentially as a text, for the training of personnel which shall perform operation tasks in this reactor. The work includes three well-defined sections. The first two ones make an introduction to the subject, while the third one, extending to more than half-work, deals with the general description of the system in which the control and operation logic of RA-3 are included. (R.J.S) [es

  4. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report [sr

  5. RA Research nuclear reactor Part 1, RA Reactor operation and maintenance in 1987; Istrazivacki nuklearni reaktor RA Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1987. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1987-12-15

    RA research reacto was not operated due to the prohibition issued in 1984 by the Government of Serbia. Three major tasks were finished in order to fulfill the licensing regulations about safety of nuclear facilities which is the condition for obtaining permanent operation licence. These projects involved construction of the emergency cooling system, reconstruction of the existing special ventilation system, and renewal of the system for electric power supply of the reactor systems. Renewal of the RA reactor instrumentation system was initiated. Design project was done by the Russian Atomenergoeksport, and is foreseen to be completed by the end of 1988. The RA reactor safety report was finished in 1987. This annual report includes 8 annexes concerning reactor operation, activities of services and financial issues, and three special annexes: report on testing the emergency cooling system, report on renewal of the RA reactor and design specifications for reactor renewal and reconstruction. [Serbo-Croat] Reaktor RA nije radio usled zabrane Izvsnog veca Skupstine Srbije od 27. avgusta 1984. U cilju povecanja pouzdanosti rada reaktora a da bi se udovoljilo zakonskim propisima sto je uslov za dobijanje stalne dozvole za rad realizovana su tri velika zahvata na reaktoru RA. Ovi zahvati obuhvatili su izgradnju sistema za hladjenje jezgra reaktora u slucaju nuzde, rekonstukciju postojeceg sistema specijalne ventilacije i rekonstrukciju sistema napajanja elektricnom energijom neophodnih potrosaca reaktora RA. Zapoceti su radovi na modernizaciji intrumentacije reaktora RA, projekat je izradjen u sovjetskoj organizaciji Atomenergoeksport, a trebalo bi da se realizuje do kraja 1989. godine. U cilju povecanja prostora za skladistenje ozracenog nuklearnog goriva i njegovog efikasnijeg koriscenja, izradjen je su projekti za rekonstrukciju postojecih uredjaja za rukovanje gorivom, povecanje smestajnog kapaciteta i preciscavanje vode u bazenima za odlezavanje. Realizaija ovih

  6. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-12-01

    During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation [sr

  7. Diagrams about RA reactor operation, Annex 7; Prilog 7 - Rad reaktora RA po godinama - dijagrami

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    This Annex 7 includes diagrams about RA reactor operation (MWh) from 1960-1975; mean values of reactor power per day and month in 1975, and percent of utilisation of experimental space during 1975. [Serbo-Croat] Ovaj prilog sadrzi dijagrame o radu reaktora (MWh) po godinama (1960-1975); srednje vrednosti dnevne snage reaktora u 1975. godini; rad reakrora (MWh) po mesecima u 1975; procenat iskoriscenja eksperimentalnog prostora u 1975. godini.

  8. RA reactor operation and maintenance, Annual report 1974

    International Nuclear Information System (INIS)

    Milosevic, D. et al

    1974-12-01

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m 2 of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems [sr

  9. RA Reactor operation and maintenance (I-IX), Part I; Pogon i odrzavanje reaktora RA (I-IX), I Deo

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    The report on RA reactor operation and maintenance for year 1963 is divided in six tasks. This volume contains the introductory report, and three tasks of the final report, namely reactor exploitation, reactivity changes of the RA reactor before repair, planning of refuelling.

  10. Operation and maintenance of the RA reactor; Pogon i odrzavanje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, M; Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    During 1961 the RA reactor was used for irradiation of samples for 258 users ( from which 188 from the Institute) and for 34 experiments, this means productions of 5958 MWh. The production was almost four times bigger than during previous year due to the demand of the Laboratories of the Institute. Burnup of the fuel from the first batch was about 30%. This means that the operation time could be much higher. Number of safety shut-downs was 11. The reasons were related to electrical faults, 9 occurrences, failure of the instrument for reactor period measurement, once, and failure of the pump once. This report covers state and operation data of the reactor components, control instruments, devices for reactor protection, dosimetry, heavy water system, helium system, mechanical and electrical equipment. Problems related to training of the staff and lack of personnel are mentioned as well.

  11. RA Research reactor, Annual report 1970 - Operation and maintenance

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1970-12-01

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  12. Ra reactor operation plan for 1976 - Annex 6

    International Nuclear Information System (INIS)

    Martinc, R.

    1976-01-01

    Contrary to previous years the RA reactor operation plan for 1976 is conditioned by more uncertainties than ever for the following reasons. It is planned for February to repair the components in order to eliminate the consequences of leaking from the vertical experimental channel VK-4 which happened in december 1975. Apart from this, measurements related to transfer of the core to highly enriched fuel under minimum power are foreseen to be performed in February. In April, it would be indispensable to locate the point of He gas leaking and its prevention. Core transfer to highly enriched fuel is planned for April for testing of the fuel elements under operating conditions and step by step increase of the power density up to the nominal power. Complete plan for core transfer would be available by the end of February 1976. It is planned to make-up for the mentioned delays from May-December 1976 [sr

  13. RA Reactor operation and maintenance (I-IX), Part IV, Task 3.08/04, Refurbishment of the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    This volume contains reports describing maintenance and repair work of the RA reactor instrumentation, equipment of the reactor dosimetry control system, and equipment for regulation and control systems

  14. Operation and maintenance of the RA reactor in 1965

    International Nuclear Information System (INIS)

    Milosevic, D.

    1966-01-01

    It has been planned for 1965 that the RA reactor would be operated each month for 20 days at nominal power of 6.5 MW, at lower power for 5 days, meaning production of 27 400 MWh. The plan was fulfilled since reactor produced 28809 MWh, i.e. 5% more than planned. Reactor was used for irradiation in the vertical experimental channels according to the demand of 1264 users from the Institute and 191 external users. Two groups of experiments done: at nominal power simultaneously with isotope production and experiments which demanded particular power levels and temperatures. Three fuel exchanges were done during this year, meaning that 40 fuel channels were changed in total. Vertical experimental channels VEK-1 and VEK-9 having diameter 100 mm were changed by channels having diameter 50 mm and shortened by 435 mm. Channel VEK-5 with diameter 110 mm was changed shortened by 430 mm. This enabled better fuel economy, the burnup was increased from 4500 MWd/t to 5000 MWd/t. This report contains the action plan for 1966

  15. RA reactor operation and maintenance in 1992, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktoro RA u 1992. Godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-12-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems. [Serbo-Croat] U toku 1992 godine poslovi u okviru projekta 'Istrazivacki nuklearni reaktor RA' obavljani su u skladu sa programom i planom rada. Osnovne aktivnosti na kojima je radjeno odnosile su se na revitalizaciju reaktora RA, kao i na odrzavanje opreme. U ovom periodu reaktor nije bio u pogonu. Svo osoblje je bilo angazovano na poslovima rekonstrukcije i modernizacije postojecih i dogradnje novih reaktorskih sistema, na odrzavanju opreme a deo tehnickog osoblja je bio obucavan za vrsenje odgovarajucih poslova u pogonu i odrzavanju opreme.

  16. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor

    International Nuclear Information System (INIS)

    Sotic, O.; Martinc, R.; Kozomara-Maic, S.; Cupac, S.; Radivojevic, J.; Stamenkovic, D.; Skoric, M.; Miokovic, J.

    1982-12-01

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10 13 cm -2 s -1 at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the outdated spare parts

  17. Operation and maintenance of the RA reactor, RA Research reactor. Annual report 1976; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1976. godini

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-12-15

    During 1976 the Ra reactor was operating for about 30% shorter period than usual. The reason were extraordinary repair activities within regular and investment maintenance as well as repair of failures caused by neglected maintenance during previous 6 years. Delay was caused by unavailability of fuel (2% enriched fuel elements are spent) and the new 80% enriched fuel demanded experimental and theoretical analyses before being introduced into the core. Safety analyses concerned with using 80% enriched fuel both experimental and theoretical were successfully fulfilled. The December 1976 successful experimental campaign can be marked as end of the 17 years period of using 2% enriched fuel and start of the new period of using highly enriched fuel. This is significant not only for the reactor itself but for the users, because it would result in increase of neutron flux by 50% with the increase of costs by only 4%. Demand was submitted for obtaining the final license for transition operating regime with highly enriched fuel which would save at least 2 200 000 dinars. This will enable reactor operation in 1977 and later on, without interruption by 'critical' and other experiments related to new highly enriched fuel. A high number of repair and other urgent activities were fulfilled in order to enable safe operation. Some of these activities were done never before and some were neglected during past 6 years. The most important tasks were: purchase of Al tubes made of special alloy, fabrication and mounting of the fuel channel; overall investigation of reactor vessel leakage; repair of the heavy water pump; exchange of two vertical channels. basic equipment for construction of emergency cooling system was purchased. Hot cells are equipped for independent utilisation. [Serbo-Croat] Reaktor RA je u 1976. godini radio za oko 30% krace vreme od uobicajenog. Razlog su bill izuzetno veliki obim remontnih i drugih radova u okviru tekuceg i investicionog odrzavanja, kao i krupnih

  18. Nuclear Reactor RA Safety Report, Vol. 12, Accidents during reactor operation

    International Nuclear Information System (INIS)

    1986-11-01

    This volume includes description and analysis of typical accidents occurred during operation of RA reactor in chronological order, as follows: contamination of primary coolant circuit; leakage of heavy water from the primary coolant loop; contamination of vertical experimental channel; air contamination in the reactor building and loss of circulation of the primary coolant; failures of the vacuum pump and spent fuel packaging device; rupture of the spent fuel element cladding; dethronement's of capsule for irradiation of fuel element; rupture of the vertical experimental channel and contamination of the surroundings; swelling of a fuel element; appearance of deposits on the surface of the fuel elements cladding. The last chapter describes similar accidents occurred on nuclear reactors in the world [sr

  19. RA reactor operation and maintenance in 1994, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1994. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Mikic, N; Tanaskovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1994-12-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The planned major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. The existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Renewal of the reactor instrumentation was started but but it is behind the schedule because the delivery of components from USSR was stopped for political reasons. The spent fuel elements used from the very beginning of reactor operation are stored in the existing pools. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988 and was fulfilled in 1990. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Zavrseni su radovi na izgradnji sistema za udesno hladjenje, rekonstrukciji postojeceg sistema specijalne ventilacije i rekonstrukciji sistema za napajanje elektricnom energijom. Zapoceti su radovi na modernizaciji, odnosno zameni instrumentacije reaktora ali njegova realizacija kasni

  20. RA reactor operation in 1991, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1991. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-01-01

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1991, three major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the reactor power supply system. Renewal of the reactor instrumentation was started but but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA for political reasons. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Training of the existing personnel was done regularly, but lack of financial support prevented employment of new workers that would be needed for operation in shifts and regular maintenance. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Kako bi se ubuduce mogao obezbediti

  1. Operation and maintenance of the RA reactor in 1964, I-II, Part II; Pogon i odrzavanje reaktora RA u 1964. godini, I-II, II Deo

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    This volume of the report contains the following 15 Annexes: Improvement of the fuel cycle economy (record No. 37009803 in INIS DB); Analysis of neutron flux increase in horizontal experimental channels of the RA reactor record No. 37005698 in INIS DB); Application of the critical system for determining the thermal neutron flux in a research reactor with central horizontal reflector ( record No. 37055005 in INIS DB); Determining the capacity of the RA reactor heat exchanger dependent on the coolant water temperature and flow; Operation of the RA reactor in forced regime; Analysis of the CEN-132 heavy water pumps failures at the RA reactor from decontamination till present; Modifications in the vacuum loop of the distillation system; Report on decontamination of the evaporator and cleaning of the condenser of the distillation system; Operation of reactor at nominal power with reduced D{sub 2}O circulation; Cooling of the RA reactor with reduced flow rate in the heavy water loop; Measurement of the heavy water level in the fuel channels of the RA reactor; Conclusions of the experts group of the RA reactor at the meeting held on November 2 and 3 1964; Conclusions of the experts group at the meeting held on November 23 1964; After heat and the cooling problem after RA reactor shut-down; Measurement of noise and vibrations on the Ra reactor heavy water system; Calculation and measurement of the uranium temperature during irradiation in the experimental channel in the reflector of the RA reactor; Temperature measurement of the reactor materials samples irradiated in the fuel channels of the RA reactor; Study of the modifications in the synchronous generators, heavy water pumps and condenser batteries of the RA reactor.

  2. RA reactor operation and maintenance in 1989, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1989. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Zivotic, Z; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1989-12-15

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in July 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The following major tasks were fulfilled: building of the new emergency cooling system, reconstruction of the existing ventilation system, and renewal of the power supply system. Project concerned with renewal of RA reactor complete instrumentation was started at the end of 1988. Contract was signed between the IAEA and Soviet Atomenergoexport for supplying the new instrumentation for the RA reactor. Project concerned with increase of the storage space and the efficiency of handling the spent fuel elements has started in 1988. In 1989, device for water purification designed by the reactor staff started operation and spent fuel handling equipment is being mounted. Training of the existing personnel and was done regularly, but the new staff has no practical training since the reactor is not operated. Lack of financial support influenced strongly the status of RA reactor. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula 1984. Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Zavrseni su radovi na izgradnji sistema za udesno hladjenje, rekonstrukciji postojeceg sistema specijalne ventilacije i rekonstrukciji sistema za napajanje elektricnom energijom. Krajem 1988, medjunarodna agencija za atomsku energiju potpisala je ugovor sa sovjetskom firmom Atomergexport za izradu novog sistema instrumentacije. Sa ciljem da se poveca i efikasnije koristi prostor za skladistenje ozracenog goriva, 1987. godine zapoceta je realizacija projekata preciscavanja vode u bazenima za odlezavanje

  3. RA Reactor operation and maintenance (I-IX), part VII, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VII Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume covers the following reports concerned with the maintenance and repair work of the RA reactor: repair of the technical water system; maintenance of the transportation equipment; vacuuming and drying during refurbishment; repair and decontamination of the distillation device; and the report on participation of the operational dosimetry division in the RA reactor refurbishment activities.

  4. Regulations and instructions for RA reactor operation; Propisi i uputstva za pogon reaktora 'A'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-07-01

    This regulatory guide consists of following 4 chapters: Description of the RA reactor, organization scheme, regulations for performing experiments; Regulations for staff on duty; Instructions for operating the vacuum systems, heavy water and helium systems; and evacuation in case of accident. [Serbo-Croat] Ovaj pravilnik sadrzi sledeca 4 poglavlja: Opis reaktora RA, sema organizacije rada, propisi za izvodjenje eksperimenata; Pravilnik za rad dezurnog osoblja; Uputstva za rada sa vakuum sistemima, sistemom teske vode, sistemom helijuma; evakuacija u slucaju udesa.

  5. Safety analysis of RA Reactor operation I-III; Analiza sigurnosti rada Reaktora RA I - III, IZ-213-0322-1963

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This safety analysis report covers the following three parts: Technical and operational characteristics of the RA reactor; Accidents analysis; and Environmental effects of the maximum possible accident. [Serbo-Croat] Ovaj izvestaj o analizi sigurnosti rada reaktora RA sastoji se od tri dela: Tehnicke i pogonske karakteristike reaktora RA; Analiza akcidenta; i Posledice maksimalno moguceg akcidenta na okolinu reaktora.

  6. Operation, maintenance and utilization of the RA reactor, Annual report 1978

    International Nuclear Information System (INIS)

    Milosevic, M.

    1978-12-01

    It has been planned for 1978 that the RA reactor would be operated for 158 dana at nominal power of 6.5 MW meaning production of 24 648 MWh. The plan was fulfilled since 24 652 MWh was produces. Reactor operation for 158 days is relevant to reactor operation for 200 days in the period before 1975. The reason is increased neutron flux achieved due to improved fuel management and the characteristics of the new 80% enriched fuel. At the end of 1978 the reactor core contained 45% of 80% enriched fuel elements. Increase of neutron flux has shortened the typical time needed for irradiation of the most important samples for isotope production. This significant success in reactor operation is at the same time an obligation for increasing its utilization. Some new trends proposed for increasing reactor utilization capacities were presented at the Conference on utilization of research nuclear reactors in Yugoslavia held in May 1978 [sr

  7. RA Reactor operation and maintenance (I-IX), Part IV, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora RA (I-IX), IV Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume contains reports describing maintenance and repair work of the RA reactor instrumentation, equipment of the reactor dosimetry control system, and equipment for regulation and control systems.

  8. Operation and maintenance of RA Reactor, Annual report 1977; Pogon i odrzavanje reaktora RA - Izvestaj o radu u 1977. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    During 1977, the RA Reactor was operated at nominal power of 6.5 MW for 183 days. Total production was 28582 MWh which is 10% higher than planned. Second phase of introducing the 80% enriched fuel was fulfilled according to the plan. This means that the reactor core will be filled with highly enriched fuel in 1978. Refueling was done three time during the past year. After completing the first phase of the fuel exchange which was related mostly to reactor safety, the second phase will be devoted to the more efficient increase of neutron flux . This second phase is of utmost importance because higher neutron flux will provide better and more efficient reactor application from economic point of view. This will justify the application of the new more expensive highly enriched fuel. The budget for reactor operation and maintenance is hardly enough to cover the maintenance of the components and instrumentation. During 1977 there were no accidents related nor incidents related to the instrumentation or related to radiation protection. [Serbo-Croat] Reaktor RA je u toku 1977. godine ostvario rad od 28583 MWh odnosno 183 dana rada na nominalnoj snazi, sto u odnosu na plan rada iznosi 10% vise od planiranog. Druga faza uvodjenja 80% obogacenog goriva izvrsena je prema planu sto znaci da ce se punjenje jezgra reaktora 80% gorivom zavrsiti u toku 1978. godine. Izvrsene su tri izmene goriva. Posle isteka prvog dela prelaznog rezima koji je usmeren na maksimalnu sigurnost reaktora preci ce se na drugi deo usmeren na vece i brze povecanje neutronskog fluksa. Druga faza je od izuzetnog znacaja jer ce omoguciti bolje i znatno ekonomicnije koriscenje reaktora i opravdati upotrebu novog i skupljeg goriva. Sredstva za pogon i odrzavanje reaktora RA su jedva dovoljna za odrzavanje neophodnog nivoa opreme. Akcidenata u toku 1977. godine nije bilo ni sa opremom ni u pogledu zastite od zracenja.

  9. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1986; Istrazivacki nuklearni reaktor RA, deo 1, pogon i odrzavanje nukleanog reaktora RA u 1986. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1986-12-01

    In order to enable future reliable operation of the RA reactor, according to new licensing regulations, three major tasks started in 1984 were fulfilled: building of the new emergency system, reconstruction of the existing ventilation system, and reconstruction of the power supply system. Simultaneously in 1985/1986 renewal of the instrumentation and reconstruction of the system for handling and storage of the spent fuel in the reactor building have started. Design projects for these tasks are almost finished and the reconstruction of both systems is expected to be finished until 1988 and mid 1989 respectively. RA reactor Safety report was finished according to the recommendations of the IAEA. Investments in 1986 were used for 8000 kg of heavy water, maintenance of reactor systems and supply of new components, reconstruction of reactor systems. This report includes 8 annexes concerning reactor operation, activities of services and financial issues. [Serbo-Croat] Sa ciljem da se obezbedi pouzdan rad reaktora RA a u skladu sa zakonskim propisima, zavrsena su tri velika zahvata zapoceta 1984: izgradnja novog sistema za udesno hladjenje, rekonstrukcija postojeceg sistema za ventilaciju, i modernizacija reaktorske instrumentacije. Istovremeno tokom 1985/1986. zapoceta je modernizacija instrumentacije i rekonstrukcija sistema za rukovanje i skladistenje iskoriscenog goriva u zgradi reaktora. Projekti za navedene radove su vec zavrseni ili su u zavrsnoj fazi, a ocekuje se da ce rekonstrukcija oba sistema biti zavrsena do kraja 1988. odnosno sredine 1989. godine. Izrada izvestaja o sigurnosti reaktora RA, prema preporukama MAAE zavrsena je 1986. Investiciona ulaganja na reaktoru Ra u 1986. iskoriscena su za: nabavku 8000 kg teske vode, za investiciono odrzavanje reaktorskih sistema i nabavku opreme, za rekonstrukciju reaktorskih sistema. Ovaj izvestaj sadrzi 8 priloga koji opisuju rad reaktora, rad strucnih sluzbi i finansiranje.

  10. Operation and maintenance of the RA reactor, Report on operation in 1966, task 6.08

    International Nuclear Information System (INIS)

    Milosevic, D. and others

    1966-12-01

    During 1966, RA reactor was operated at nominal power for 196 days and 28 days at lower power levels. The total production was 31015 MWh which is 3% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 644 users, of which 516 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1966, and a chart showing discrepancies from the plan. data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 37, of which 20 were caused by power cuts, 10 due to voltage instabilities, 4 due to human error and 3 due to failures of instrumentation. These data are compared to safety shutdown data of previous few years. There have been no accidents which could cause any significant effects. The incidents occurred during this year are described in detail. Detailed data concerning exposure of the personnel are part of this report

  11. Operation of the RA research nuclear reactor under forced regime; Rad istrazivackog nuklearnog reaktora RA u forsiranom rezimu

    Energy Technology Data Exchange (ETDEWEB)

    Mitrovic, S [Institut za nuklearne nauke Boris Kidric, Vinca, Beograd (Yugoslavia)

    1964-07-01

    Ra reactor was designed for operation at nominal power of 6.5 MW and under forced regime. From the start of operation in 1959 until the general refurbishment in 1963 it was not operated under forced regime. At reactor power of 10 MW the mean thermal neutron flux increases from 3 to 4.6 10{sup 13} n cm{sup -2} sec{sup -1}, the maximum neutron flux increases from 6 to 9.3 10{sup 13} n cm{sup -2} sec{sup -1}, and at the exit of the experimental channel it increases from 5 to 7.7 10{sup 9} n cm{sup -2} sec{sup -1}. In order to achieve safer and more suitable operating conditions, winter period of 1963 was chosen for the first increase of reactor power level, because of low temperatures in the secondary coolant loop. This paper contains the most relevant data concerned with the reactor operation at increased power.

  12. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1984; Istrazivacki nuklearni reaktor RA - Deo I - Pogon, odrzavanje i eksploatacija nuklearnog reaktora RA u 1984. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1984-12-15

    During the 1984 the reactor operation was limited by the temporary operating license issued by the Committee of Serbian ministry for health and social care. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. This temporary license has limited the reactor power to 2 MW from 1981. Operation of the primary cooling system was changed in order to avoid appearance of the previously noticed aluminium oxyhydrate on the surface of the fuel element claddings. The new cooling regime enabled more efficient heavy water purification. Control and maintenance of the reactor instrumentation and tools was done regularly but dependent on the availability of the spare parts. In order to enable future reliable operation of the RA reactor, according to new licensing regulations, during 1984, three major tasks are planned: building of the new emergency system, reconstruction of the existing ventilation system, and renewal of the reactor instrumentation. Financing of the planned activities will be partly covered by the IAEA. this Part I of the report includes 8 Annexes describing in detail the reactor operation, and 6 special papers dealing with the problems of reactor operation and utilization.

  13. RA Reactor applications, Annex A

    International Nuclear Information System (INIS)

    Cupac, S.; Vukadin, Z.

    2000-01-01

    Full text: In 2000 Ra reactor was not operated. New instrumentation is not complete, without it, it is not possible to think about reactor start-up. Since 1985, when reactor operation was forbidden, there are 480 fuel elements left in 48 fuel channels in the reactor core. Heavy water was removed from the reactor core because of the repair of the heavy water pumps in 1986. The old instrumentation was removed. Eleven years after being left to its own destiny, it would be difficult to imagine that anybody would think of reactor restart without examining the state of reactor vessel and other vital reactor components. Maintaining the reactor under existing conditions without final decision about restart or permanent shutdown is destructive for this nuclear facility. The existing state that pertains for more than 10 years would have only one result, destruction of the RA reactor [sr

  14. RA Reactor applications, Annex A

    International Nuclear Information System (INIS)

    Cupac, S.; Vukadin, Z.

    1998-01-01

    Full text: In 1998 Ra reactor was not operated. New instrumentation is not complete, without it, it is not possible to think about reactor start-up. Since 1985, when reactor operation was forbidden, there are 480 fuel elements left in 48 fuel channels in the reactor core. Heavy water was removed from the reactor core because of the repair of the heavy water pumps in 1986. The old instrumentation was removed. Eleven years after being left to its own destiny, it would be difficult to imagine that anybody would think of reactor restart without examining the state of reactor vessel and other vital reactor components. Maintaining the reactor under existing conditions without final decision about restart or permanent shutdown is destructive for this nuclear facility. The existing state that pertains for more than 10 years would have only one result, destruction of the RA reactor [sr

  15. RA Reactor applications, Annex A

    International Nuclear Information System (INIS)

    Cupac, S.; Vukadin, Z.

    1996-01-01

    Full text: In 2000 Ra reactor was not operated. New instrumentation is not complete, without it, it is not possible to think about reactor start-up. Since 1985, when reactor operation was forbidden, there are 480 fuel elements left in 48 fuel channels in the reactor core. Heavy water was removed from the reactor core because of the repair of the heavy water pumps in 1986. The old instrumentation was removed. Eleven years after being left to its own destiny, it would be difficult to imagine that anybody would think of reactor restart without examining the state of reactor vessel and other vital reactor components. Maintaining the reactor under existing conditions without final decision about restart or permanent shutdown is destructive for this nuclear facility. The existing state that pertains for more than 10 years would have only one result, destruction of the RA reactor [sr

  16. RA reactor operation and maintenance, Annual report 1974; Pogon i odrzavanje reaktora RA - Izvestaj o radu u 1974. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1974-12-15

    During 1974, RA reactor was operated at nominal power for 194 days and 13 days at lower power levels. The total production was 30711 MWh which is 2.4% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 437 users. This report contains detailed data about reactor power and experiments performed in 1974. Total number of afety shutdowns was 11, of which 8 were caused by power cuts, and 3 due to human error. Maximum individual personnel exposure dose was 50% of the maximum permissible dose. There were no accidents during this year. Decontamination of surfaces was less than during previous years. About 805 m{sup 2} of surfaces and 178 objects were decontaminated. It was concluded that the successful operation in 1974 has a special significance taking into account the financial problems. [Serbo-Croat] Reaktor RA je u 1974. godini radio na nominalnoj snazi 194 dana i 13 dana na manjim snagama. Ukupni rad iznosio je 30711 MWh odnosno 1,4% vise od planiranog. Prakticno nije bilo odstupanja od plana rada. Reaktor je koriscen za ozracivanja i eksperimente za 437 korisnika. Ovaj izvestaj sadrzi detaljne podatke o radu i eksperimentima koji su obavljani. U toku godine bilo je 11 sigurnosnih zaustavljanja, od cega 8 zbog elektricnog napona i 3 usled greske osoblja. Ukupna doza ozracivanja ljudstva bila je manja nego prethodnih godina. Maksimalna doza po oveku bila je 50% manja od maksimalno dozvoljene doze. Nije bilo ni jednog akcidenta. Dekontaminirano je znatno manje povrsina nego ranijih godina, i sakupljeno manje otpada nego prethodnih godina, dok tecnih efluenata nije bilo. Zakljuceno je da uspesan rad reaktora u 1974. godini ima poseban znacaj kada se imaju na umu problemi finansiranja reaktora.

  17. RA Reactor applications, Annex A

    International Nuclear Information System (INIS)

    Martinc, R.; Cupac, S.; Stanic, A.

    1990-01-01

    RA reactor was not operated during the past five years due to the renewal and reconstruction of the reactor systems, which in underway. In the period from 1986-1990, reactor was operated only 144 MWh in 1986, for the need of testing the reactor systems and possibility of irradiating 125 I. Reactor will not be operated in 1991 because of the exchange of complete instrumentation which is planned to be finished by the end of 1991. It is expected to start operation in May 1992. That is why this annex includes the plan of reactor operation for period of nine months starting from from the moment of start-up. It is planned to operate the reactor at 0.02 MW power first three months, to increase the power gradually and reach 3.5 MW after 8 months of operation. It is foreseen to operate the reactor at 4.7 MW from the tenth month on [sr

  18. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex A - Reactor applications

    International Nuclear Information System (INIS)

    Martinc, R.; Stanic, A.

    1985-01-01

    This document describes reactor operation from 1981 to 1985, including data about short term (shorter than 24 hours) and long term operation interruptions, as well as safety shutdown and reactor applications. During 1982, 1983 until July 1984 reactor was operated at 2 MW power according to the plan. Plan was not fulfilled in 1983 because deposits were noticed again, at the end of 1982, on the surface of fuel elements. Reactor was mainly used for neutron activation purposes and isotope production as source of neutrons for experimental purposes [sr

  19. RA Research nuclear reactor, Part 1, RA reactor operation and maintenance in 1993, with comparative review for the period 1991 - 1993, Annex 3

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Mikic, N.; Tanaskovic, M.

    1993-01-01

    RA reactor was not operated during 1993 because of the complete instrumentation exchange. Although it has been planned to exchange the complete instrumentation until the end of 1993, and to start reactor operation in the first half of 1993 this was not fulfilled because the instrumentation was not delivered until the end of 1993. Main activities during past seven years were related to construction of the emergency cooling system; repair and reconstruction of the system for handling the spent fuel and improvement of spent fuel storage conditions; exchange of the aged instrumentation. Other reactor components and systems, reactor core, primary coolant loop and gas circulation system are in good condition concerning future start-up [sr

  20. Operation and maintenance of the RA reactor in 1965; Pogon i odrzavanje reaktora RA. Izvestaj o radu u 1965. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1966-01-15

    It has been planned for 1965 that the RA reactor would be operated each month for 20 days at nominal power of 6.5 MW, at lower power for 5 days, meaning production of 27 400 MWh. The plan was fulfilled since reactor produced 28809 MWh, i.e. 5% more than planned. Reactor was used for irradiation in the vertical experimental channels according to the demand of 1264 users from the Institute and 191 external users. Two groups of experiments done: at nominal power simultaneously with isotope production and experiments which demanded particular power levels and temperatures. Three fuel exchanges were done during this year, meaning that 40 fuel channels were changed in total. Vertical experimental channels VEK-1 and VEK-9 having diameter 100 mm were changed by channels having diameter 50 mm and shortened by 435 mm. Channel VEK-5 with diameter 110 mm was changed shortened by 430 mm. This enabled better fuel economy, the burnup was increased from 4500 MWd/t to 5000 MWd/t. This report contains the action plan for 1966.

  1. Results of environmental radiation monitoring and meteorology measurements (material prepared for obtaining the licence for RA reactor experimental operation)

    International Nuclear Information System (INIS)

    1980-10-01

    According to the demands for obtaining the licence for restarting the Ra reactor and the experimental operation this document includes the radiation monitoring measured data in the working space and environment of the RA reactor, i.e. Boris Kidric Institute. The meteorology measured data are included as well. All the measurements are performed according to the radiation protection program applied actually from the first reactor start-up at the end of 1959 [sr

  2. Operational report, basics of the preliminary project for reconstruction of the RA reactor ventilation system

    International Nuclear Information System (INIS)

    Martinc, R.

    1982-01-01

    This report presents the summary of results needed for designing the reconstruction of the RA reactor ventilation system. The final complete report will published later, including results of possible additional analyses according to the needs of main detailed project. Due to the size of the facility the need of filters for particulates is expected in systems V-1 and V-2, as well as revision of the system V-4. Adsorption filters are not needed in case of operation under regular working conditions. It would be favorable, but not indispensable to construct an adsorption filter that could be used occasionally at the input of V-2 system under the upper water shielding. This filter would be switched on when dehermetization of the reactor is planned and increased radioactivity is indicated in the gas system or experimental space of the RA reactor as well as in case of fuel elements failure. The aim of applying filters is shortening the time these elements would spend in the hermetized reactor i.e. their fast removal from the reactor. It is indispensable to build-in 'emergency' highly efficient adsorption filters in the V-2 system which would be switched on in case of accidents that would cause fuel elements meltdown (with simultaneous accident dehermetization of the heavy water system) [sr

  3. Safety analysis of RA reactor operation, I-II, Part I - RA reactor technical and operation characteristics; Analiza sigurnosti rada reaktora RA - I-III, I deo - Tehnicke i pogonske karakteristike reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    RA research reactor is a thermal, heavy water moderated system with graphite reflector having nominal power 6.5 MW. The 2% enriched metal uranium fuel in the reactor core produces mean thermal neutron flux of 2.9 10{sup 13} neutrons/cm{sup 2} s, and maximum neutron flux 5.5 10{sup 13} neutrons/cm{sup 2} s. main components of the reactor described in this report are: rector core, reflector, biological shield, heavy water cooling system, ordinary water cooling system, helium system, reactor control system, reactor safety system, dosimetry system, power supply system, and fuel transport system. Detailed reactor properties and engineering drawings of all the system are part of this volume.

  4. RA Research nuclear reactor, Part I - RA nuclear reactor operation, maintenance and utilization in 1983; Istrazivacki nuklearni reaktor RA - Deo I - Pogon, odrzavanje i eksploatacija nuklearnog reaktora RA u 1983. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Kozomara-Maic, S; Cupac, S; Raickovic, N; Radivojevic, J; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1983-12-15

    After regular shutdown in November 1982, inspection of the fuel elements from the RA reactor core which was done from December 1982 - February 1983 has shown that there are deposits of aluminium oxides on the surface of the fuel cladding. After restart The RA reactor was operated at power levels from 1.8 - 2 MW, with 80% enriched uranium dioxide fuel elements. It was found that there was no corrosion of the fuel element cladding and that it was not possible to find the cause of surface deposition on the cladding surfaces without further operation. It was decided to purify the heavy water permanently during operation and to increase the heavy water flow by operating two pumps. This procedure was adopted in order to decrease the possibility of corrosion. The Safety committee of the Institute has approved this procedure for operating the RA reactor in 1983. The core was made of 80% enriched fuel, critical experiments were done until June 1983, and after that the operation was continued at power levels up to 2 MW. [Serbo-Croat] Pregledom nuklearnog goriva iz tehnoloskih kanala reaktora RA koji je izvrsen u periodu decembear 1982-feburuar 1983. godine nakon zaustavljanja reaktora po isteku novembarske kampanje 1982. godine, ustanovljeno je da ponovo dolazi do stvaranja taloga u obliku hidratisanih oksida aluminiuma na kosuljicama gorivnih elemenata. Nakon ponovnog pustanja u rad, reaktor je do novembra 1981. godine neprekidno bio u pogonu na snagama 1,8 - 2 MW. Jezgro je bilo formirano iskljucivo sa od gorivnih elemenata sa 80% obogacenim uran dioksidom. Utvrdjeno je da kosuljica gorivnog elementa nije korodirala, i da se bez nastval rada ne moze utvrditi uzrok pojave taloga na povrsini kosuljice. Da bi se mogucnost korozije aluminjumskih komponenti u primarnom kolu raktora svela na sto manju meru odluceno je da se vrsi neprekidno preciscavanje teske vode i da se istovremeno poveca protok teske vode radom dve pumpe, Komitet za sigurnost Instituta odobrio je ovakav nacin

  5. RA Research reactor, Annual report 1968 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1968. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1968-12-15

    During 1968, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and during 50 days at lower power levels. Total production amounted to 31051 MWh which is 3.5% higher than planned. reactor was used for irradiation and experiments according to the demand of 600 users, of which 517 from the Institute and 83 externals users. This report contains detailed data about reactor power and experiments performed in 1968. It is concluded that the reactor operation was more successful than during previous years. There was only one longer interruption which lasted 27 hours because of the power cut on the cable for the pump station on Danube. Number of safety shutdowns were at the same level as during last year. The only significant incident in 1968 was air contamination with the radioactive argon in the reactor hall. The reactor operation was not interrupted although the hall was evacuated for two hours. The was no significant exposure of the staff. In April and September the integral dosed were higher than during other months because of the accident during refueling (mixing the slugs with irradiated and fresh fuel). There was no significant surface contamination, i.e. the decontaminated surface were negligible. Due to 'mixing' refueling scheme. [Serbo-Croat] Reaktor RA je u 1968. godini radio na nominalnoj snazi od 6,5 MW 190 dana i 50 dana na manjim snagama. Ukupni rad iznosio je 31051 MWh odnosno 3,5% vise od planiranog. Reaktor je koriscen za ozracivanja i eksperimente za 600 korisnika od cega 517 iz Instituta i 83 za korisnika izvan Instituta. Ovaj izvestaj sadrzi detaljne podatke o radu i eksperimentima koji su obavljani. Zakljucuje se da je reaktor radio uspesnije nego prethodnih godina. U toku 1968. godine samo je jedan duzi prekid u radu od 27 casova izazvan zbog proboja kablovske glave na odvodu za pumpnu stanicu na Dunavu. Sigurnosna zaustavljanja bila su na proslogodisnjem nivou. Jedini znacajniji incident u 1968. godini, bio je kontaminacija vazduha

  6. Ra reactor operation plan for 1976 - Annex 6; Prilog 6 - Plan rada reaktora RA za 1976. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    Contrary to previous years the RA reactor operation plan for 1976 is conditioned by more uncertainties than ever for the following reasons. It is planned for February to repair the components in order to eliminate the consequences of leaking from the vertical experimental channel VK-4 which happened in december 1975. Apart from this, measurements related to transfer of the core to highly enriched fuel under minimum power are foreseen to be performed in February. In April, it would be indispensable to locate the point of He gas leaking and its prevention. Core transfer to highly enriched fuel is planned for April for testing of the fuel elements under operating conditions and step by step increase of the power density up to the nominal power. Complete plan for core transfer would be available by the end of February 1976. It is planned to make-up for the mentioned delays from May-December 1976. [Serbo-Croat] Za razliku od prethodnih godina izrada plana rada reaktora RA za 1976. godinu vezana je za mnogo vise neizvesnosti nego ikada ranije iz sledecih razloga. U februaru se vrsi remont opreme i uklanjanja posledica procurivanja vertikalnog eksperimentalog kanala VK-4, koje se dogodilo decembra 1975. Sem toga u februaru se vrse merenja na minimalnim snagama u sklopu priprema za prelazak na novo gorivo. U aprilu ce biti neophodno lociranje mesta gde istice He gas kao i otklanjanje uzroka ovog curenja. Planirano je da se u aprilu ubaci novo gorivo u jezgro u cilju testiranja pod radnim uslovima uz postepeno povecanje snage do nominalne. Planirano je da se smanjeni obim rada usled navedenih uslova nadoknadi u potpunosti u periodu maj-decembar 1976.

  7. RA Research reactor, Part 1, Operation and maintenance of the RA nuclear reactor for 1988; Istrazivacki nuklearni reaktor RA, deo 1, pogon i odrzavanje nukleanog reaktora RA u 1988. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Cupac, S; Sulem, B; Badrljica, R; Majstorovic, D; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1988-12-15

    According to the action plan for 1988, operation of the RA reactor should have been restarted in October, but the operating license was not obtained. Control and maintenance of the reactor components was done regularly and efficiently dependent on the availability of the spare parts. The major difficulty was maintenance of the reactor instrumentation. Period of the reactor shutdown was used for repair of the heavy water pumps in the primary coolant loop. With the aim to ensure future safe and reliable reactor operation, action were started concerning renewal of the reactor instrumentation. Design project was done by the soviet company Atomenergoeksport. The contract for constructing this equipment was signed, and it is planned that the equipment will be delivered by the end of 1990. In order to increase the space for storage of the irradiated fuel elements and its more efficient usage, projects were started concerned with reconstruction of the existing fuel handling equipment, increase of the storage space and purification of the water in the fuel storage pools. These projects are scheduled to be finished in mid 1989. This report includes 8 annexes concerning reactor operation, activities of services and financial issues. [Serbo-Croat] Prema planu za 1988. godinu, reaktor RA je trebalo da pusten u rad oktobra meseca, medjutim nije dobio dozvolu za nastavak rada. Kontrola i odrzavanje opreme izvrsavani su redovno i efikasno, u granicama koje su diktirane raspolozivoscu repromaterijala i rezervnih delova. Najvecu poteskocu pricinjavalo je odrzavanje instrumentacije. Period stajanja u 1988. godini iskoriscen je za remont teskovodnih pumpi u primarnom kolu hladjenja. U cilju povecanja pouzdanosti rada reaktora zapoceti su radovi na modernizaciji instrumentacije, projekat je izradjen u sovjetskoj organizaciji Atomenergoeksport, sklopljen je ugovor o izradi ove opreme koja bi trebalo da bude isporucena do kraja 1990. U cilju povecanja prostora za skladistenje ozracenog

  8. RA Research reactor, Annual report 1970 - Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1970. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1970-12-15

    During 1970, the RA Reactor was operated at nominal power of 6.5 MW for 160 days, and 40 days at lower power levels. Total production mounted to 25968 MWh which is 3.87% higher than planned. The action plan was changed compared to the previous years because of sending the heavy water to France for re-concentration. Isotopic concentration of the heavy water was decreased to 99.05% and now after re-concentration it is 99.96%. Discrepancy from the action plan, in September was caused by the delay return of the heavy water for administrative and transportation difficulties. The restart of the reactor in September was postponed because the cladding of one fuel element was damaged immediately after the start-up, and the reactor had to be shutdown. In October and November reactor was in operation 28 and 25 days respectively which enabled to make up for the lost time. Reactor was used for irradiation and experiments according to the demand of 390 users, 340 from the Institute and 50 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. Shorter interruptions were caused only by difficulties with water supply pipes and sliding of the soil. Reactor was only twice scram shutdown because of the false signals caused by failures of the electronic control instrumentation. the period when reactor was not in operation was used for inspection of the reactor vessel internals. By using special TV cameras and telescopes, it was found that the there are no signs of corrosion on the reactor vessel, e.e. that the internals are in a very good state. Simultaneously, connection for the pipes of future emergency core cooling system were constructed. During 1970, the spent fuel was repacked from fuel channels into special aluminium casks. Four casks containing 660 fuel slugs was deposited int the storage pool No.4. There is now 18 casks with 2951 spent fuel slugs in

  9. Research nuclear reactor RA - Annual Report 1975. Operation and maintenance; Istrazivacki nuklearni reaktor RA - Izvestaj za 1975. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    The plan for 1975 was successfully fulfilled. This is reflected in research related to improvement of operating properties of the RA reactor, mostly due to the effort of the RA staff employed in operation and maintenance of the reactor. Fuel saving achieved by this activity amounted to about 38% (80% enriched fuel). Preliminary work is done, concerned with new reactor core with highly enriched fuel. This is a significant saving as well. New fuel elements have arrived at the end of this year. It is going to enable increase of neutron flux by 50% without changing the nominal operating power. The possibility of further improvement of the reactor are analyzed, to enable material testing and production of radioactive sources. Mid term plan for reactor operation was made according to this analysis. It is planned to further increase the neutron flux in isolated smaller zones, and building new experimental loops with cooling and fast neutron converters. Much was done to increase the safety level of reactor operation and preparing the safety report. [Serbo-Croat] Izvrsenje zadataka u 1975. godini bilo je uspesno. To se ogleda u povecanju istrazivackog rada vezanog za poboljsanje eksploatacionih karakteristika reaktora RA, pretezno koriscenjem sopstvenog kadra angazovanog u pogonu i odrzavanju reaktora. Ovim radom postignuta je usteda goriva od oko 38% (80% obogaceno gorivo). Izvrseni su preliminarni radovi na prevodjenju reaktora RA na novo gorivo, sto je takodje velika usteda. Novo gorivo je stiglo krajem godine i ono ce obezbediti porast neutronskog fluksa od 50%, bez promene nominalne snage reaktora. Izvrsena je analiza mogucnosti daljeg usavrsavanja reaktora za potrebe ispitivanja materijala kao i proizvodnju radioaktivnih izvora. Na osnovu ove analize nacinjen je srednjorocni program rada reaktora RA sa tezistem na daljem povecanju fluksa u izdvojenim manjim zonama i ugradnju 'hladjenih petlji' i brzih konvertora. Mnogo je ucinjeno na povecanju stepena sigurnosti

  10. Nuclear Reactor RA Safety Report, Vol. 12, Accidents during reactor operation; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 12, Akcidenti u dosadasnjem radu reaktora

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    This volume includes description and analysis of typical accidents occurred during operation of RA reactor in chronological order, as follows: contamination of primary coolant circuit; leakage of heavy water from the primary coolant loop; contamination of vertical experimental channel; air contamination in the reactor building and loss of circulation of the primary coolant; failures of the vacuum pump and spent fuel packaging device; rupture of the spent fuel element cladding; dethronement's of capsule for irradiation of fuel element; rupture of the vertical experimental channel and contamination of the surroundings; swelling of a fuel element; appearance of deposits on the surface of the fuel elements cladding. The last chapter describes similar accidents occurred on nuclear reactors in the world. [Serbo-Croat] Ova knjiga sadrzi hronoloski pregled i analizu karakteristika akcidenata u dosadasnjem radu reaktora RA: kontaminacija primarnog kola hladjenja; isticanje teske vode is primarnog kola hladjenje; kontaminacija eksperimentalnog vertikalnog kanala; kontaminacija vazduha u hali reaktora i prestanak cirkulacije primarnog hladioca; otkaz vakum pumpe i uredjaja za prepakivanje ozracenog goriva; proboj kosuljice ozracenog gorivnog elementa; dehermetizacija kapsule za ozracivanje nuklearnog goriva; proboj eksperimentalnog vertikalnog kanala i kontaminacija prostorija; bubrenje gorivnog elementa; pojava taloga na kosuljicama gorivnih elemenata. Poslednje poglavlje opisuje udese na koji su se dogodili na nuklearnim reaktorima u svetu.

  11. Research nuclear reactor RA - Annual Report 1989

    International Nuclear Information System (INIS)

    Sotic, O.

    1989-12-01

    Annual report concerning the project 'RA research nuclear reactor' for 1989, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities [sr

  12. RA Research nuclear reactor - Annual report 1987

    International Nuclear Information System (INIS)

    1987-12-01

    Annual report concerning the project 'RA research nuclear reactor' for 1987, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities [sr

  13. RA Research reactor, Annual report 1988

    International Nuclear Information System (INIS)

    Sotic, O.

    1988-12-01

    Annual report concerning the project 'RA research nuclear reactor' for 1989, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities [sr

  14. Operation, maintenance and utilization of the RA reactor, Annual report 1978; Pogon, odrzavanje i eksploatacija reaktora RA, Izvestaj o radu u 1978. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-12-15

    It has been planned for 1978 that the RA reactor would be operated for 158 dana at nominal power of 6.5 MW meaning production of 24 648 MWh. The plan was fulfilled since 24 652 MWh was produces. Reactor operation for 158 days is relevant to reactor operation for 200 days in the period before 1975. The reason is increased neutron flux achieved due to improved fuel management and the characteristics of the new 80% enriched fuel. At the end of 1978 the reactor core contained 45% of 80% enriched fuel elements. Increase of neutron flux has shortened the typical time needed for irradiation of the most important samples for isotope production. This significant success in reactor operation is at the same time an obligation for increasing its utilization. Some new trends proposed for increasing reactor utilization capacities were presented at the Conference on utilization of research nuclear reactors in Yugoslavia held in May 1978. [Serbo-Croat] Reaktor RA imao je u planu za 1978. godinu 158 dana rada na nominalnoj snazi od 6.5 MW, sto odgovara radu od 24 648 MWh. Ostvareno je 24 652 MWh sto znaci da je plan ostvaren. Rad reaktora od 158 dana odgovara radu reaktora od 200 dana u periodu pre 1975. godine. Razlog je povecanje neutronskog fluksa zahvaljujuci usavrsenom rukovanju gorivom i karakteristikama novog 80% obogacenog goriva. Krajem 1978. godine 45% jezgra reaktora bilo je popunjeno novim 80% obogacenim gorivom. Povecani neutronski fluks omogucio je skracenje vremena ozracivanja vaznih uzoraka za proizvodnju radioaktivnih izotopa. Ovaj znacajan uspeh je istovremeno obaveza znatno veceg iskoriscenja reaktora RA. Rezultati napora da se postigne vece iskoriscenje reaktora RA prezentirani su na Konferenciji o koriscenju nuklearnih reaktora u Jugoslaviji koja je odrzana u maju 1978.

  15. RA research reactor - properties and experimental capabilities

    International Nuclear Information System (INIS)

    Milosevic, M.; Martinc, R.

    1978-01-01

    The brief survey of the Reactor RA exploitation experience, as well as the reactor equipment state, after 18 years of operation is presented. The results of efforts spent on reactor characteristics improvement in order to ensure safe and reliable reactor operation for next 15-20 years, are described [sr

  16. RA Reactor operation and maintenance (I-IX), part VIII, Task 3.08/05, Decontamination of the reactor

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-12-01

    Permanent increase of radiation in the heavy water system was noticed during first three year of the RA reactor operation, even when the reactor was shutdown. It was found that there was no failure of the fuel element cladding. Radioactive cobalt was found in the heavy water which was rather strange. During repair of the heavy water system, it has been found that stellite was used for coating the heavy water pumps. Since stellite is a cobalt alloy, this could have been the source of radioactive cobalt in the heavy water. The stellite coating was damaged due to friction and particle of cobalt appeared in the coolant, they were activated since they were in the core. decontamination of the heavy water and the heavy water coolant loop was a must . Beside the detailed report on the contamination and decontamination of the heavy water system this volume includes 14 annexes describing the investigation of the event and the whole procedure of decontamination

  17. Operation, maintenance and utilization of the RA reactor - Report on operation in 1979; Pogon, odrzavanje i eksploatacija reaktora RA, Izvestaj o radu u 1979. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M

    1979-12-15

    During 1979 the RA reactor was in operation only three months, i.e. only 24% of the planned activity was achieved. The reactor operation was interrupted in March due to problems that could not be solved by the existing equipment. Alkalinity of the heavy water resulting from the existing ammonia ions could not be removed by the existing distillation system. In addition deposition of aluminium oxyhydrate on the fuel elements was increased. This was noticed during routine control when the reactor was shutdown for refueling. The decision of the Director general of the Institute and sanitary Inspector followed, prohibiting further reactor operation. A separate chapter of this report is devoted to the analysis of the difficulties and possible solution of the problem in cooperation with the experts from different laboratories of the Institute. Aged and damaged instruments at the reactor were not exchange due to lack of budget. During the operation there were no accidents. [Serbo-Croat] U toku 1979. godine plan rada ostvaren je sa 24%, odnosno reaktor je radio samo prva tri meseca. U martu je doslo do prekida rada reaktora zbog pojave koja se nije mogla otkloniti postojecom opremom. Alkalnost teske vode, posledica prisustva amonijum jona, ne moze se odstraniti sistemom destilacije. Pored toga usled dotrajalosti opreme povecano je talozenje aluminijum oksihidroksida na gorivnim elementima. Ova pojava uocena je tokom rutinske kontrole prilikom izmene goriva a usledila je obustava rada resenjem Direktora i sanitarnog inspektora. Posebno poglavlje ovog izvestaja posveceno je analizi teskoca u radu i reaktora i resavanju nastalih problema sa gorivom u saradnji sa saradnicima drugih laboratorija Instituta. Dotrajali uredjaji i oprema nisu zamenjeni usled nedostatka sredstava. U toku rada nije bilo akcidenata.

  18. RA Research reactor, Part I: Technical and operational properties of the RA reactor; Analiza sigurnosti rada Reaktora RA I-III, Deo I: Tehnicke i pogonske karakteristike reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Zecevic, V; Nikolic, M; Popovic, B; Milosevic, M; Milic, M; Strugar, P; Pesic, M; Nikolic, V; Rajic, M; Radivojevic, J; Jankovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    RA reactor is a research reactor with rather high power density. Apart from research it is used for isotope production and industrial applications due to high reactivity excess (about 11%). It is a thermal reactor, heavy water moderated, cooled by D{sub 2}O, and H{sub 2}O, with a graphite reflector. Nominal power is 6.5 MW. Fuel is 2% enriched metal uranium, reactor core height is 1220 mm, and diameter is 1405 mm. Reactor lattice is square with lattice pitch 130 mm. There is 6 horizontal experimental channels and a graphite column. There is a total of 84 fuel channels and 45 experimental channels in the core. Maximum thermal neutron flux is 5.5 10{sup 13} n/cm{sup 2} s at nominal power level.

  19. Operation, safety and utilization of the RA reactor in 1978 - Report; Prilog I - Rad, sigurnost i iskoriscenost reaktora RA u 1978. godini - Izvestaj

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Stanic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-12-15

    This report includes a review of work related to development of reactor operation capacities and increase of the RA reactor safety and economic operation. Statistical data about reactor operation and utilization are included as well. Introducing of the new 80% enriched fuel into the the reactor core enabled increase of the neutron flux, i.e. increase of its production capabilities. Safety and optimization analyses concerned with introduction of the new fuel have shown that the most safe and economic procedure was gradual introducing of the highly enriched fuel. This procedure was based on the concept of mixed core configuration with 2% and 80% enriched fuel elements. By applying this original concept the following significant savings were achieved: fuel elements savings, shortening of the annual period of reactor operation, savings in spent fuel casks, electric power savings, slowing down of heavy water degradation. [Serbo-Croat] Ovaj izvestaj sadrzi pregled o radu na razvoju eksploatacionih mogucnosti i povecanju sigurnosti i ekonomicnosti reaktora RA. Prilozeni su i statisticki podaci o radu i iskoriscenosti reaktora u 1978. godini. Uvodjenje novog 80% obogacenog goriva u jezgro reaktora omogucilo je povecanje neutronskog fluksa tj. povecanje njegovoh proizvodnih mogucnosti. Sigurnosne i optimizacione analize uvodjenja novog goriva pokazale su da je nasigurniji i najekonomicniji postupak postupnog uvodjenja visokoobogacenog goriva koji se zasniva na konceptu mesane resetke sa 2% i 80% obogacenim gorivom. Ovaj originalni koncept omogucio je da se postignu znatne ustede u gorivu, skracivanje godisnjeg rada reaktora, usteda sudova za odlaganje isluzenog goriva, usteda elektricne energije, usporavanje degradacije teske vode.

  20. Operation, maintenance and utilization of the RA reactor, Annual report for 1980; Pogon, odrzavanje i eksploatacija reaktora RA, Izvestaj o radu u 1980. godini

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-12-15

    During 1980 the activities of RA reactor staff was conducted in two directions: repair works and determination of the state of the existing equipment; and preparing and constructing additional equipment and completing the documentation needed to fulfill the new legal regulations. preparation of the existing equipment for future operation was finished, but construction of the additional equipment (according to the regulations) is not done at planned rate due to different reasons such as lack of budget, administration, import. This report includes a chapter devoted to the analysis of the operation difficulties that caused prohibition of reactor operation as well as difficulties in achievement of the planned activities for 1980. Data about financial issues are included as well. [Serbo-Croat] U toku 1980. godine rad OOUR-a Nuklearni reaktor RA odvijao se u dva smera: remontnim radovima i utvrdjivanju stanja postojece opreme i u pripremi i ugradnji potrebne dodatne opreme i kompletiranju neophodne dokumentacije prema novim zakonskim propisima. Priprema postojece opreme za rad je u potpunosti izvrsena, dok se projekti i ugradnja dodatne opreme (prema zakonskim obavezama) ne odvija potrebnom brzinom zbog raznih objektivnih razloga, kao nedostatak sredstava, odobrenja, uvoza. Ovaj izvestaj sadrzi poglavlje posveceno analizi teskoca u radu koje su dovele do zabrane rada reaktora, i teskoca u realizovanju plana rada u 1980. godini, ako i podatke o finansiranju projekta 'pogon, odrzavanje i eksploatacija reaktora RA'.

  1. Safety analysis of RA reactor operation, I-III, Part III - Environmental effect of the maximum credible accident

    International Nuclear Information System (INIS)

    Raisic, N.

    1963-02-01

    Maximum credible accident at the RA reactor would consider release of fission products into the environment. This would result from fuel elements failure or meltdown due to loss of coolant. The analysis presented in this report assumes that the reactor was operating at nominal power at the moment of maximum possible accident. The report includes calculations of fission products activity at the moment of accident, total activity release during the accident, concentration of radioactive material in the air in the reactor neighbourhood, and the analysis of accident environmental effects

  2. RA Research reactor Annual report 1981 - Part 1, Operation, maintenance and utilization of the RA reactor; Istrazivacki nuklearni reaktor RA, Deo 1 - Pogon, odrzavanje i eksploatacija reaktora u 1981. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Milosevic, M; Martinc, R; Kozomara-Maic, S; Cupac, S; Radivojevic, J; Stamenkovic, D; Skoric, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1981-12-15

    The RA nuclear reactor stopped operation after March 1979 campaign due to appearance of aluminium oxyhydrates deposits on the surface of fuel element claddings. Relevant decisions of the Sanitary inspection body of the Ministry of health and the Director General of the 'Boris Kidric' Institute of nuclear sciences, Vinca, banned further reactor operation until reasons caused aluminium oxyhydrates deposition are investigated and removed to enable regular reactor operation. Until the end of 1979 and during 1980, after a series of analyses and findings that caused cease of reactor operation, all the preparatory actions needed for restart were performed. Due to the fact that there is no emergency cooling system and no appropriate filtering system at the reactor, and according to the new regulations about start up of nuclear facilities, the Sanitary inspection body made a decision about temporary licence for reactor start-up meaning performance of the 'zero experiment' limiting the operating power to 1% of the nominal power. Accordingly the reactor was restarted on January 21 1981. Criticality was reached with the core made of 80% enriched fuel elements only. After the experiment was finished by the end of March a permission was demanded for operation at higher power levels at full power. Taking into account the state of the reactor components the operating licence was issued limiting the power to 2 MW until reconstruction of the ventilation system and construction of the emergency cooling system are fulfilled. Program of testing operation started on September 15 1981 increasing gradually the operating power. Thus the reactor was operated at 2 MW power for 15 days during November and December. The total production achieved in 1981 was 1698 MWh. This enabled isotopes production at the reactor during last two months. Control and maintenance of the reactor components and systems was done regularly and efficiently within limits imposed by availability of spare parts. The

  3. Operation and maintenance of the RA nuclear reactor for 1977, Report Annex I; Rad i iskoriscenost reaktora RA u 1977. godini, izvestaj Prilog I

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Stanic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    RA reactor operation plan was fulfilled, meaning 28583 MWh. In addition to 183 days of operation at full power, during 1977 the reactor was operated for 14 days at lower power level according to the demand of users. The utilization level of rector irradiation capability (neutron flux and time of operation) was 14%. This annex includes detailed statistical data about reactor operation, utilization, power level, savings concerned with new 80% enriched fuel. All the 9 vertical experimental channels were used for irradiation in the reactor core. Digression from the action plan were caused by refueling and demand od the users. There have been 11 safety shutdowns, of which 6 caused by power cuts, 4 due to failure of the instruments, and 1 due to earthquake in March 1977. [Serbo-Croat] Planirani rad reaktora na nominalnoj snazi ostvaren je u iznosu od 28583 MWh. U toku 1977. godine reaktor je radio 14 dana na manjim snagama i u posebnom eksperimentalnom rezimu na zahtev korisnika. Iskoriscenost kapaciteta reaktora za ozracivanje uzoraka (na bazi neutronskog fluksa i vremena rada reaktora) bila je 41%. Ovaj izvestaj sadrzi detaljne statisticke podatke o radu i iskoriscenosti reaktora, podatke o ustedi goriva prelaskom na 80% obogaceno gorivo. Korisceno je svih 9 vertikalnih eksperimentalnih kanala u aktivnoj zoni. Uzroci odstupanja od plana rada osim zamene goriva bili su zahtevi korisnika. Bilo je 11 sigurnosnih zaustavljanja, 6 usled nestanka napona, 4 usled kvarova opreme i instrumentacije, i 1 put usled zemljotresa u martu.

  4. RA research nuclear reactor operation in forced regime, Annex 5; Prilog 5 - Rad istrazivackog nuklearnog reaktora RA u forsiranom rezimu, Prvo saopstenje

    Energy Technology Data Exchange (ETDEWEB)

    Mitrovic, S [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    In order to increase the flux and experimental potentials of the RA reactor, properties of the reactor operating in the forced regime have been inspected four times, twice with the spent fuel (core C), and twice with partly fresh fuel (cores E and F). Forced regime means power higher than nominal 6.5 MW. From the analyses of technology parameters during operation in the forced regime at power levels of 7 and 11 MW, state and behaviour of the components, efficiency of the biological protection and other parameters it was concluded that the reactor operation is possible at power levels of 10 MW during a whole year, and under certain conditions even longer operation at power levels up to 15 MW. This paper examines the reactor operation conditions in the forced regime and gives conclusions related to real increase of the experimental possibilities, isotope production and economic factors. Radi povecanja fluksa i eksperimentalnih mogucnosti reaktora RA, cetiri puta su proverene osobine reaktora u forsiranom rezimu, tj. na snagama vecim od nominalne (6,5 MW) i to dva puta sa istrosenim gorivom (jezgro C) i dva puta sa delimicno svezim (jezgra E i F). Iz analize tehnoloskih parametara u toku eksperimentalno rada reaktora u forsiranom rezimu na snagama od 7 do 11 MW, stanja i ponasanja opreme, efikasnosti bioloske zastite i ostalih parametara, zakljucuje se da je moguc permanentan rad reaktora tokom cele godine na snagama do 10 MW, a pod izvesnim uslovima i duzi rad na snagama do 15 MW. U radu su diskutovani uslovi rada reaktora u forsiranom rezimu i donose se zakljucci o realnom povecanju eksperimentalnih mogucnosti, proizvodnje radioizotopa i o ekonomskim faktorima (author)

  5. Data concerning operation and application of RA reactor in 1975, Annex 1; Prilog 1 - Podaci o radu i iskoriscenosti reaktora RA u 1975. godini

    Energy Technology Data Exchange (ETDEWEB)

    Stanic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    RA reactor was operating according to the plan for 1975 adopted in December of the previous year. It was planned for reactor to be operated at nominal power first 10-20 days each month, three following days were reserved for different power levels according to the users' demand. Four fuel exchanges were planned and fulfilled with minor delay. Data concerning planned and real operation, as well as delays from the plan and shorter interruptions are presented in tables of this Annex. It is shown that all the delays and interruptions which amounted to 104 hours were compensated. [Serbo-Croat] Reaktor RA je radio prema planu rada za 1975. godinu, nacinjenom u decembru prethodne godine. Planirano je da reaktor radi neprekidno prvih 10-20 dana u mesecu na nominalnoj snazi, tri sledeca dana je rezervisano za rad na drugim snagama zavisno od potreba korisnuka. Planirane su i 4 izmene goriva. Podaci o planiranom i ostvarenom radu kao i odstupanjima od plana i kracim prekidima u radu reaktora dati su u tabelama ovog priloga. Vidi se da su sva odstupanja i prekidi u ukupnom trajanju od 104 sata u celini nadoknadjeni.

  6. RA Reactor operation and maintenance (I-IX), part VI, Task 3.08/04, Refurbishment of the RA reactor; Pogon i odrzavanje reaktora (I-IX), VI Deo, Zadatak 3.08/04 Remont reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the period planned for maintenance and refurbishment of the RA reactor the gas reactor system including the ventilation system was inspected and tested, the components were cleaned. This report describes detailed instructions and actions concerning repair and decontamination of the gas and ventilation systems components.

  7. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13

    International Nuclear Information System (INIS)

    Ninkovic, M.

    1963-01-01

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system

  8. Radiation protection at the RA Reactor in 1998, RA reactor annual report, Part -2

    International Nuclear Information System (INIS)

    Ninkovic, M.; Pavlovic, R.; Mandic, M.; Pavlovic, S.; Grsic, Z.

    1998-01-01

    Radiation protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry at the RA reactor; (2) Radioactivity control in the vicinity of the reactor and meteorology measurements; (3) Collecting and treatment of fluid effluents; and (4) radioactive wastes, decontamination and actions. Each of the category is described as a separate annex of this report [sr

  9. RA Research nuclear reactor, Part II: radiation protection at the RA reactor in 1987

    International Nuclear Information System (INIS)

    Ninkovic, M.; Ajdacic, N.; Zaric, M.; Vukovic, Z.

    1987-01-01

    Radiation protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry at the RA reactor and radiation protection; (2) Radioactivity control in the vicinity of the reactor and meteorology measurements; (3) Decontamination and relevant actions, collecting and treatment of fluid effluents; and and solid radioactive wastes [sr

  10. Radiation protection at the RA Reactor in 1988, Part -2, RA reactor annual report

    International Nuclear Information System (INIS)

    Ninkovic, M.; Ajdacic, N.; Zaric, M.; Vukovic, Z.

    1988-01-01

    Radiation protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry at the RA reactor and radiation protection; (2) Radioactivity control in the vicinity of the reactor and meteorology measurements; (3) Decontamination and relevant actions, collecting and treatment of fluid effluents; and and solid radioactive wastes [sr

  11. Operation and maintenance of the RA reactor in 1964, I-II, Part I

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1964-12-01

    During 1964, the Reactor as operated about 20 days each months at nominal power of 6.5 MW, 5 days at lower power levels and 5 days were used for maintenance. Total production was 27930 MWh which is 11.7% higher than the planned value. Fuel exchange was done 3 times during this period, 98 spent fuel channels were exchanged. In addition to routine maintenance of reactor components and instruments a series of analyses of heavy water and helium were done. Special attention was devoted to corrosion analyses of the reactor materials because of the heavy water system was refurbished decontaminated in 1963. Utilization of the experimental space in the reactor was better that previously. 546 samples were irradiated till the end of November, of which 443 for users from the Institute. Specific irradiations in the fast neutron flux were done in six VISA-2 channels in the core

  12. RA research nuclear reactor - Annual report 1985; Istrazivacki nuklearni reaktor RA - Izvestaj za 1985. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1985-12-01

    Research reactor RA Annual report for year 1985 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1985 godinu sastoji se od dva dela: prvi deo obuhvata pogon i odzavanje reaktora RA, a drugi poslove zastite od zracenja na reaktoru RA.

  13. RA Research reactor, Annual report 1986; Istrazivacki nuklearni reaktor RA - Izvestaj za 1986. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1986-12-01

    Research reactor RA Annual report for year 1985 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1986 godinu sastoji se od dva dela: prvi deo obuhvata pogon i odzavanje reaktora RA, a drugi poslove zastite od zracenja na reaktoru RA.

  14. Activity of the RA Reactor Physics group in 1980 - Definition of the Operation conditions for future safe and economical RA reactor operation with 80% enriched fuel; Prilog Ia - Rad sluzbe za fiziku reaktora RA u 1980. godini - Definisanje pogonskih uslova za dalji siguran i ekonomican rad reaktora RA sa 80% obogacenim gorivom

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-12-15

    During 1980. the RA reactor was not in operation. That is why this period was devoted to definition of operating conditions for further reactor operation with 80% enriched fuel. The fuel elements which were in the core at the moment of shutdown in March 1979will not be used again (388 80% enriched fuel elements, and 511 2% enriched fuel elements). The reactor will be operated only with 80% enriched fuel, staring with initiat core configuration with 440 elements on the borders gradually changing to equi;librium core with 720 fuel elements. The analyses were concerned with safety issues of future operation. [Serbo-Croat] Reaktor RA tokom 1980 godine nije radio. Zbog toga je ovaj period iskoriscen za intenzivan rad na definisanju pogonskih uslova za dalji rad reaktora sa 80% obogacenim gorivom. Gorivo sa kojim je reaktor prestao da radi marta 1979. godine (388 gorivnih elemenata 80% obogacenoh i 511 elementa 2% obogaceno) nece biti vraceno u jezgro, vec ce reaktor raditi samo sa 80% obogacenim gorivom, pocev od konfiguracije sa 440 elemenata na periferiji do ravnotezne konfiguracije sa 720 elemenata. Sve nalize su se bavile sigurnosnim aspektima rada reaktora sa visokoobogacenim gorivom u jezgru.

  15. External irradiation of the personnel operating the reactor RA at Vinca in the period 1963-1966

    International Nuclear Information System (INIS)

    Ninkovic, M.M.; Minincic, Z.

    1968-06-01

    The paper first gives a survey of the characteristic operations performed on the Vinca reactor RA in which most of the personnel become irradiated. Following is a schematic diagram of the irradiations in the period 1963-1966 in which the reactor was in continual operation. The surveys are given for each month and each year separately, while the irradiated personnel are grouped in several characteristic irradiation dose ranges. In this analysis special emphasis is given to a survey of irradiation of the personnel classified according to their profession, i.e. their post. This kind of analysis is indispensable in planning work, proper disposition of the personnel and undertaking special protective measures for reducing the irradiations (author) [sr

  16. RA Research reactor Annual report 1982 - Part 1, Operation, maintenance and utilization of the RA reactor; Istrazivacki nuklearni reaktor RA - Deo 1 - Pogon, odrzavanje i eksploatacija nuklearnog reaktora RA u 1982. godini

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Martinc, R; Kozomara-Maic, S; Cupac, S; Radivojevic, J; Stamenkovic, D; Skoric, M; Miokovic, J [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1982-12-15

    Reactor test operation started in September 1981 at 2 MW power with 80% enriched fuel continued during 1982 according to the previous plan. The initial reactor core was made of 44 fuel channel each containing 10 fuel slugs. The first half of 1982 was used for the needed measurements and analysis of operating parameters and functioning of reactor systems and equipment under operating conditions. Program concerned with the testing operation at higher power levels was started in the second half of this year. It was found that the inherent excess reactivity and control rod worths ensure safe operation according to the IAEA safety standards. Excess reactivity is high enough to enable higher power level of 4.7 MW during 4 monthly cycles each lasting 15-20 days. Favourable conditions for cooling exist for the initial core configuration. Effects of poisoning at startup on the reactivity and power density distribution were measured as well as initial spatial distribution of the neutron flux which was 3,9 10{sup 13} cm{sup -2} s{sup -1} at 2 MW power. Modification of the calibration coefficient in the system for automated power level control was determined. All the results show that all the safety criteria and limitations concerned with fuel utilization are fulfilled if reactor power would be 4.7 MW. Additional testing operation at 3, 4, and 4.7 MW power levels will be needed after obtaining the licence for operating at nominal power. Transition from the initial core with 44 fuel channels to the equilibrium lattice configuration with 72 fuel channels each containing 10 fuel slugs, would be done gradually. Reactor was not operated in September because of the secondary coolant pipes were exchanged between Danube and the horizontal sedimentary. Control and maintenance of the reactor equipment was done regularly and efficiently dependent on the availability of the spare parts. Difficulties in maintenance of the reactor instrumentation were caused by unavailability of the

  17. Research nuclear reactor RA - Annual Report 1994

    International Nuclear Information System (INIS)

    Sotic, O.

    1994-12-01

    Activities related to revitalisation of the RA reactor stared in 1986, were continued in 1991. A number of interventions on the reactor components were finished that are supposed to enable continuous and reliable operation. The last, and at the same time largest action, related to exchange of complete reactor instrumentation is underway, but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Activities related to improvement of Russian project were continued in 1994. Control and maintenance of the reactor components was done regularly and efficiently. Extensive repair of the secondary coolant loop is almost finished and will be completed in the first part of 1995 according to existing legal procedures and IAEA recommendations. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 47 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. Research reactor RA Annual report for year 1991 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection [sr

  18. Research nuclear reactor RA, Annual Report 2001

    International Nuclear Information System (INIS)

    Sotic, O.

    2002-01-01

    During 2001, activities at the RA research nuclear reactor in were performed according to the Contract about financing of the RA reactor for the period January-December 2001, signed by the Ministry of Science, technology and development of the Republic of Serbia. RA reactor was not operated since shutdown in August 1984. Although, the most of the planned reconstruction activities were finished until 1991, the most important, which was concerned with exchange of the reactor instrumentation, financed by the IAEA, was interrupted due to international sanctions imposed on the country. Since 1992, all the renewal and reconstruction activities were ceased. Continuous aging and degradation of the equipment and facilities demand decision making about the future status of the Ra reactor. Until this decision is made it is an obligation to maintain control and maintenance of ventilation system, power supply, internal transportation system, spent fuel storage, hot cells, electronic fuel surveillance system, and part of the stationary dosimetry system. In 2001, apart from the mentioned activities, actions were undertaken related to maintenance of the reactor building and installations. The most important tasks fulfilled were: protection of the roof of the ventilation system building, purchase and installing the fire protection system and twelve new battery cells in the reactor building. There were no actions concerned with improvement of the conditions for intermediate spent fuel storage. With the support of IAEA, actions were initiated for possible transport of the spent fuel tu Russia. At the end of 2001, preparations were started for possible future decommissioning of the RA reactor. After, renewal of the membership of our country in the IAEA, the Government of Yugoslavia has declared its attitude about the intention of RA reactor decommissioning at the General Conference in September 2001 [sr

  19. Research nuclear reactor RA - Annual Report 1991

    International Nuclear Information System (INIS)

    Sotic, O.

    1992-01-01

    Activities related to revitalisation of the RA reactor stared in 1986, were continued in 1991. A number of interventions on the reactor components were finished that are supposed to enable continuous and reliable operation. The last, and at the same time largest action, related to exchange of complete reactor instrumentation is underway, but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Construction of some support elements is almost finished by the local staff. The Institute has undertaken this activity in order to speed up the ending of the project. If all the planned instrumentation would not arrive until the end of March 1992, it would not be possible to start the RA reactor testing operation in the first part of 1993, as previously planned. In 1991, 53 staff members took part in the activities during 1991, which is considered sufficient for maintenance and repair conditions. Research reactor RA Annual report for year 1991 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection [sr

  20. Results of environmental radiation monitoring and meteorology measurements (material prepared for obtaining the licence for RA reactor experimental operation); Rezultati merenja zracenja u okolini i rezultati meteoroloskih merenja (materijal pripremljen radi dobijanja dozvole za pustanje Reaktora RA u probni rad)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1980-10-15

    According to the demands for obtaining the licence for restarting the Ra reactor and the experimental operation this document includes the radiation monitoring measured data in the working space and environment of the RA reactor, i.e. Boris Kidric Institute. The meteorology measured data are included as well. All the measurements are performed according to the radiation protection program applied actually from the first reactor start-up at the end of 1959. [Serbo-Croat] Saglasno zahtevu za dobijanje dozvole za ponovno pustanje u probni rad reaktora RA, ovaj dokument sadrzi rezultate merenja zracenja u okolini (radnoj i zivotnoj) reaktora RA odnosno instituta 'Boris Kidric' kao i podatke o meteoroloskim merenjima. Sve merenja rade se prema programu mera zastite od zracenja koje se sprovode prakticno od prvog pustanja reaktora u rad krajem 1959. godine.

  1. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex D - Report of the Mechanics Service

    International Nuclear Information System (INIS)

    Sulem, B.

    1985-01-01

    Service for mechanical components at the RA reactor includes: control and maintenance of utility components, mechanical workshop, hot cells and storage. Control and maintenance of main components covers: reactor core, heavy water system, technical water system, gas system. This service is responsible for the following auxiliary systems: transportation units; spent fuel storage pool; special ventilation system; personal protection appliances; hot cells. Maintenance of the reactor building, ventilation, heating, water supply, sewage, fire protection devices, gas and compressed air systems are included [sr

  2. Operators retraining in RA-1

    International Nuclear Information System (INIS)

    Pereira, R; Daoud, A

    2012-01-01

    The nuclear activity in Argentina has its foundational milestone in the creation of the Comision Nacional de EnergIa Atomica in 1950. Achievements since then, linked to the area of nuclear reactors and nuclear fuel materials, fuel cycle facilities and the applications of nuclear technology in medicine, industry, agriculture, food preservation, environmental studies and many others, have relied on personnel trained in this specific technology in both professional and technical level. This training has been done in most cases in the exclusive scope of CNEA. Eventually CNEA has been linked with the University to ensure that personnel training concerned to work done in the nuclear field had guarantees of formality and excellence. The creation of the Instituto de Tecnologia Nuclear Dan Beninson that, under an agreement with the Universidad Nacional de General San Martin, has set up an enabling environment for the training of professionals and university technicians to serve with the multiple and growing use of this technology. On the other hand the Institute has been issuing, along with its careers, specialized courses that, in some cases, have been requested by CNEA's nuclear installations and companies related to the nuclear sector. In particular, the Specialization in Nuclear Reactors and its Fuel Cycle (ERCC) and the Courses of Introduction to Nuclear Technology-Complementary training for Installations Personnel Class I (CI-CC), this last, recognized by the ARN as a requirement for applying to the individual licensing examination, providing work experience in the RA-1 reactor among which we can find commissioning, control rods calibration by various methods and calculations of reactivity. With this practical framework developed in the RA-1 and the academic support provided by the Instituto de Tecnologia Nuclear Dan Beninson it was developed a training program for nuclear reactors operators. Let us stress that this research reactor has been forming generations

  3. Experimental operation of the RA reactor with 4 fuel channels containing 80% enriched dispersion fuel - Operational Report; Radni izvestaj - Eksperimentalna kampanja reaktora RA sa 4 kanala sa 80% obogacenim disperzionim gorivom

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Milosevic, M; Cupac, S; Kozomara, S [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-12-15

    Start of utilization of the new 80% enriched dispersion nuclear fuel is underway in the RA reactor core. Both economic and technical analyses were in favor of introducing the new fuel elements gradually into the RA reactor core. Thus overall theoretical and experimental analyses as well as other preparations are directed to transition regime based on gradual introducing of new fuel into the core, i.e. reactor core with two types of fuel. The objective of these analyses and preparation is establishment of conditions for safe reactor operation during transition period. The analyses and preparations are almost completed. The experimental data about fuel burnup during a time period of operation at nominal power i.e. daily decrease of excess reactivity is missing. This data is needed for planning the refueling (quantity of fresh fuel and frequency of refueling) during the transient period. This data can be obtained only by normal operation of the reactor during a period of time significantly longer than the period of attaining equilibrium poisoning, as time between two D{sub 2}O condensate overflows into the RA reactor core. Thus a ten day experimental campaign was planned to be done in December 1976. This report presents the most important results of safety analyses and preparation which show that, during this experimental period, the reactor operation is absolutely safe taking into account the most important parameters influencing reactor safety, as reactivity, thermal and temperature limits for fuel and the reactor, etc. Data to be obtained during this experimental campaign are significant because they would enable definition of future supply of fresh fuel during the transition period. [Serbo-Croat] Predstoji pocetak koriscenja novog 80% obogacenog uranskog disperzionog goriva u reaktoru RA. Ekonomske i tehnicke analize dale su prednost postupku postepenog uvodjenja novog goriva u reaktor RA. Prema tome, obimne teorijske i eksperimentalne analize i druge pripreme

  4. Radiation protection at the RA Reactor in 1993, RA research reactor, Part

    International Nuclear Information System (INIS)

    Ninkovic, M.; Pavlovic, R.; Mandic, M.; Sipka, V.; Grsic, Z.

    1993-01-01

    Radiation protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry and radiation protection at the RA reactor; (2) decontamination, collecting and treatment of fluid effluents and solid wastes; (3) Radioactivity control in the vicinity of the reactor and (4)meteorology measurements; (3). Each of the category is described as a separate annex of this report [sr

  5. Physical measurements at the RA reactor related to VISA-2, e. Measurements of flux and reactivity during RA reactor operation and exploitation; Fizicka merenja na reaktoru RA u vezi projekta VISA-2, e. Pracenje fluksa i reaktivnosti u toku eksploatacije reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Markovic, H [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-05-15

    This report includes the following: characteristics of neutron flux in vertical experimental channels of the RA reactor; characteristics of neutron flux in VISA-2 channels; reactivity changes in the reactor during VISA-2 irradiation including calibration of control rods.

  6. RA research reactor - potentials and prospective

    International Nuclear Information System (INIS)

    Sotic, O.

    1984-01-01

    Since December 1959, the RA reactor was operated successfully, except for a few shorter periods needed for maintenance and a four longer shutdown periods caused by decrease in the heavy water quality. Accordingly, reconstruction of some reactor systems was started at the beginning of this decad, as well as increase of its experimental potential which would enable its efficient reliable operation in the future period. Reconstruction is concerned with emergency core cooling system, special ventilation system, and modernization of the reactor instrumentation. Improvement of the experimental potential is related to modifications of the neutron scattering instruments. Development of methods for isotope production is described as well. Design of the reactor experimental loop with external cooling system will be of significant importance in improvement of reactor potential in the future

  7. Nuclear Reactor RA Safety Report, Vol. 4, Reactor

    International Nuclear Information System (INIS)

    1986-11-01

    RA research reactor is thermal heavy water moderated and cooled reactor. Metal uranium 2% enriched fuel elements were used at the beginning of its operation. Since 1976, 80% enriched uranium oxide dispersed in aluminium fuel elements were gradually introduced into the core and are the only ones presently used. Reactor core is cylindrical, having diameter 40 cm and 123 cm high. Reaktor core is made up of 82 fuel elements in aluminium channels, lattice is square, lattice pitch 13 cm. Reactor vessel is cylindrical made of 8 mm thick aluminium, inside diameter 140 cm and 5.5 m high surrounded with neutron reflector and biological shield. There is no containment, the reactor building is playing the shielding role. Three pumps enable circulation of heavy water in the primary cooling circuit. Degradation of heavy water is prevented by helium cover gas. Control rods with cadmium regulate the reactor operation. There are eleven absorption rods, seven are used for long term reactivity compensation, two for automatic power regulation and two for safety shutdown. Total anti reactivity of the rods amounts to 24%. RA reactor is equipped with a number of experimental channels, 45 vertical (9 in the core), 34 in the graphite reflector and two in the water biological shield; and six horizontal channels regularly distributed in the core. This volume include detailed description of systems and components of the RA reactor, reactor core parameters, thermal hydraulics of the core, fuel elements, fuel elements handling equipment, fuel management, and experimental devices [sr

  8. RA reactor operation and maintenance in 1990 with comparative evaluation from 1986-1990, Part 1; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1990. godini, uz uporedni pregled za period 1986-1990. godina

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Vasovic, B; Sanovic, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1990-12-15

    During the previous period RA reactor was not operated because the Committee of Serbian ministry for health and social care has cancelled the operation licence in August 1984. The reason was the non existing emergency cooling system and lack of appropriate filters in the special ventilation system. The new emergency cooling system and the reconstruction of the existing ventilation system were finished in 1989, the conditions for further reactor operation were fulfilled. In the meantime new licensing regulations adopted in 1988 were not demanding the mentioned conditions for reactors operated at power less than 10MW, RA reactor power being 6.5 MW. But the reactor could not be restarted due to planned renewal of the reactor instrumentation. It is planned to exchange the complete instrumentation by the end of 1991. Training program for the staff operating and maintaining the reactor components was prepared in 1985. Reconstruction, modification and construction of components demanded new documentation needed for further safe reactor operation. New version of RA reactor safety report was finished in 1986 according to the recommendations of IAEA and licensing regulations of Yugoslavia. In 1989, new documents were written covering regulations and instructions for reactor operation. The new reactor experimental loop was designed in 1986, and constructed and tested in 1990. All the reactor components were maintained by specific reactor services. Financing of the reactor remains a permanent problem. [Serbo-Croat] U proteklom periodu reaktor RA nije bio u pogonu zato sto je 30. jula 1984. godine Republicki komitet za zdravlje i socijalnu politiku republike Srbije, zabranio njegov rad zbog toga sto reaktor ne poseduje sistem za udesno hladjenje i ne poseduje odgovarajuce filtere u sistemu specijalne ventilacije. Radovi na izgradnji sistema za udesno hladjenje i rekonstrukciji postojeceg sistema specijalne ventilacije zavrseni su 1989. godine. Uslovi za nastavak rada reaktora

  9. RA Research reactor, Annual report 1971

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1971-12-01

    During 1971, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and 50 days at lower power levels. Total production mounted to 31606 MWh which is 5.3% higher than planned, and the highest annual level since the reactor started operation. Reactor was used for irradiation and experiments according to the demand of 425 users, of which 370 from the Institute and 55 external users. This report contains detailed data about reactor power and experiments performed in 1971. Discrepancies from the action plan, meaning higher production was achieved in June and December due to special demand of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to power cuts during reactor operation. There was no longer interruption caused by failures of the equipment. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. Shorter interruptions resulted from breaking of connectors in the technical water pipe system caused by soil sliding near the pumping station on the Danube. Total personnel exposure dose was lower than during previous years. There was no accident nor any event that could be called accidental. Decontamination od surfaces was less than during previous years. It was concluded that the successful operation in 1971 resulted from efficient work during past years. But, some of the activities were interrupted due to undefined policy concerned with operation of the RA reactor and financial issues. This involves study of the possibility to use highly enriched fuel that would increase the useful neutron flux and the reactor compatibility with similar reactors for the future ten years. Another project that has been interrupted is construction of the emergency core cooling system which is important for the reactor safety. Financial problems have influenced not only the reactor operation but the number of employees, which could cause negative

  10. Dosimetry and technical radiation protection at the RA reactor in 1979, Report on the project 'Operation and maintenance of the RA reactor'

    International Nuclear Information System (INIS)

    Ninkovic, M. et al.

    1979-12-01

    This report include the analysis of the dosimetry and technical radiation protection results collected during 1979. The first part shows the data about the fundamental exposure to radiation and the statistical review of the total number of measurements. The following are included as well: measured values of radioactive gases and aerosol contents in air; contamination level of surfaces, clothes and uncovered parts of the staff bodies. Analysis of the personnel exposure is presented in the second part of the report. It was stated that the maximum individual external dose was 9.5 mGy, and the exposure dose was 1/5 lower than the annual dose limit for all the exposed personnel. It was estimated that that the internal contamination is negligible compared to the external contamination. This statement was based on the frequency of tasks in the contaminated zones, undertaken control and protection measures, as well as on the evaluation of the expected internal contamination. Comparative evaluation of the occupational exposures is given for the past five years. This showed that the exposure in 1979 was approximately on the same level as the mean value during past four years. The third part of the report covers the numerical data about the quantity of the collected radioactive waste, total size of contaminated and decontaminated surfaces and number of decontaminated objects. A brief analysis of the accidents occurred during this year under regular reactor operating conditions, maintenance and repair is given at the end. It was stated that there has been no accident that would cause exposure higher than the prescribed limits or any significant contamination of the working space or environment. The more detailed analyses concerned with radiation protection aspects of the irregularities noticed on the nuclear fuel elements were described in the Annex. It was concluded that the mentioned problems did not cause any leaks. This was significant for planning and manipulating the

  11. Optimum RA reactor fuelling scheme

    International Nuclear Information System (INIS)

    Strugar, P.; Nikolic, V.

    1965-10-01

    Ideal reactor refueling scheme can be achieved only by continuous fuel elements movement in the core, which is not possible, and thus approximations are applied. One of the possible approximations is discontinuous movement of fuel elements groups in radial direction. This enables higher burnup especially if axial exchange is possible. Analysis of refueling schemes in the RA reactor core and schemes with mixing the fresh and used fuel elements show that 30% higher burnup can be achieved by applying mixing, and even 40% if reactivity due to decrease in experimental space is taken into account. Up to now, mean burnup of 4400 MWd/t has been achieved, and the proposed fueling scheme with reduction of experimental space could achieve mean burnup of 6300 MWd/t which means about 25 Mwd/t per fuel channel [sr

  12. Nuclear Reactor RA Safety Report, Vol. 14, Safety protection measures

    International Nuclear Information System (INIS)

    1986-11-01

    Nuclear reactor accidents can be caused by three type of errors: failure of reactor components including (1) control and measuring instrumentation, (2) errors in operation procedure, (3) natural disasters. Safety during reactor operation are secured during its design and construction and later during operation. Both construction and administrative procedures are applied to attain safe operation. Technical safety features include fission product barriers, fuel elements cladding, primary reactor components (reactor vessel, primary cooling pipes, heat exchanger in the pump), reactor building. Safety system is the system for safe reactor shutdown and auxiliary safety system. RA reactor operating regulations and instructions are administrative acts applied to avoid possible human error caused accidents [sr

  13. Research nuclear reactor RA - Annual report 1992

    International Nuclear Information System (INIS)

    Sotic, O.

    1992-12-01

    Research reactor RA Annual report for year 1992 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. Second annex B is a paper by Z. Vukadin 'Recurrence formulas for evaluating expansion series of depletion functions' published in 'Kerntechnik' 56, (1991) No.6 (INIS record no. 23024136. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data [sr

  14. Opinion about difficulties of RA reactor operation under conditions of high activity of the heavy water system - Annex 2

    International Nuclear Information System (INIS)

    Nikolic, M.

    1963-01-01

    It was concluded that reactor the reactor operation is very dangerous for the reactor installation as well as safety of the staff under conditions of heavy water increased activity. Two fundamental arguments in favour of this conclusion are: insufficient possibility of reactor components inspection during maintenance and operation in the future period; difficulties in prevention of accidents that could occur is equally dangerous for the reactor facility and the environment. Cleaning and decontamination of the complete heavy water system is needed before the reactor operation starts in order to avoid possible failures or accidental events [sr

  15. Safety analysis of RA reactor operation, I-III, Part III - Environmental effect of the maximum credible accident; Analiza sigurnosti rada reaktora RA - I-III, III deo - Posledica maksimalno moguceg akcidenta na okolinu reaktora

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    Maximum credible accident at the RA reactor would consider release of fission products into the environment. This would result from fuel elements failure or meltdown due to loss of coolant. The analysis presented in this report assumes that the reactor was operating at nominal power at the moment of maximum possible accident. The report includes calculations of fission products activity at the moment of accident, total activity release during the accident, concentration of radioactive material in the air in the reactor neighbourhood, and the analysis of accident environmental effects.

  16. RA Research reactor, Annual report 1988; Istrazivacki nuklearni reaktor RA - Izvestaj za 1988. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1988-12-15

    Annual report concerning the project 'RA research nuclear reactor' for 1989, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1989. godinu, koji finansira republicka zajednica za nauku SR Srbije po ugovoru br. 3705/1 sastoji se iz dva dela. Prvi deo obuhvata pogon i odrzavanje nuklearnog reaktora RA, sto predstavlja obavezu Odeljenja za reaktorski inzenjering u sastavu OOUR Instituta za multidisciplinarna istrazivanja i inzenjering RA. Drugi deo obuhvata poslove zastite od zracenja na reaktoru RA, sto predstavlja obavezu OOUR Instituta za zastitu od zracenja 'Zastita'. Naucno vece Instituta za multidisciplinarna istrazivanja i inzenjering RA ocenilo je da sadrzina ovog izvestaja odgovara izvrsenim poslovima na reaktoru RA u 1989. godini. Pozitivno se ocenjuje obim i kvalitet izvrsenih radova kako u pogledu odrzavanja i rekonstrukcije reaktora, tako i u pogledu poslova zastite od zracenja izvrsenih kod njega.

  17. Research nuclear reactor RA - Annual Report 1989; Istrazivacki nuklearni reaktor RA - Izvestaj za 1989. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1989-12-15

    Annual report concerning the project 'RA research nuclear reactor' for 1989, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1989. godinu, koji finansira republicka zajednica za nauku SR Srbije po ugovoru br. 3705/1 sastoji se iz dva dela. Prvi deo obuhvata pogon i odrzavanje nuklearnog reaktora RA, sto predstavlja obavezu Odeljenja za reaktorski inzenjering u sastavu OOUR Instituta za multidisciplinarna istrazivanja i inzenjering RA. Drugi deo obuhvata poslove zastite od zracenja na reaktoru RA, sto predstavlja obavezu OOUR Instituta za zastitu od zracenja 'Zastita'. Naucno vece Instituta za multidisciplinarna istrazivanja i inzenjering RA ocenilo je da sadrzina ovog izvestaja odgovara izvrsenim poslovima na reaktoru RA u 1989. godini. Pozitivno se ocenjuje obim i kvalitet izvrsenih radova kako u pogledu odrzavanja i rekonstrukcije reaktora, tako i u pogledu poslova zastite od zracenja izvrsenih kod njega.

  18. RA Research nuclear reactor, Part 1, RA reactor operation and maintenance in 1993, with comparative review for the period 1991 - 1993, Annex 3; Projekat Istrazivacki nuklearni reaktor RA - 1 Deo Pogon i odrzavanje nuklearnog reaktora RA u 1993. godini, uz uporedni pregled za period 1991 - 1993. - prilog 3

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O; Cupac, S; Sulem, B; Zivotic, Z; Mikic, N; Tanaskovic, M [Vinca Institute of Nuclear Sciences, Beograd (Serbia and Montenegro)

    1993-12-15

    RA reactor was not operated during 1993 because of the complete instrumentation exchange. Although it has been planned to exchange the complete instrumentation until the end of 1993, and to start reactor operation in the first half of 1993 this was not fulfilled because the instrumentation was not delivered until the end of 1993. Main activities during past seven years were related to construction of the emergency cooling system; repair and reconstruction of the system for handling the spent fuel and improvement of spent fuel storage conditions; exchange of the aged instrumentation. Other reactor components and systems, reactor core, primary coolant loop and gas circulation system are in good condition concerning future start-up. [Serbo-Croat] U 1993. godini reaktor nije bio u pogonu zbog zamene njegove celokupne instrumentacije. Iako je bilo planirano da se celokupna instrumentacija zameni do kraja 1993. te da reaktor pocne sa radom u prvoj polovini 1993. Ovo nije ispunjeno jer celokupna oprema nije isporucena ni do kraja 1993. godine. Osnovni zahvati koji su u proteklih sedma godina izvrseni, odnosili su se na izgradnju sistema za udesno hladjenje, rekonstrukciju sistema za rukovanje ozracenim gorivom i poboljsanje uslova za stokiranje ovog goriva, zamenu instrumentacije. Ostali sistemi reaktora, reaktorsko jezgro, primarno kolo hladjenja i sistem za cirkulaciju gasa su u dobrom stanju i mogu se nesmetano koristiti u buducem radu.

  19. Operation and maintenance of the RA reactor, Report on operation in 1967, task 7.08; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1967. god. Zadtak 7.08

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D and others [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1967-12-15

    During 1967, RA reactor was operated at nominal power for 190 days and 23 days at lower power levels. The total production was 31060 MWh. Report contains data until Dec. 22. 1967, but the reactor was planned to operate three more full days at nominal power of 6.5 MW, meaning that the total number of operation at full power would be 193 days ant the total production would be 30625 which is 2% higher than planned. Practically there were no discrepancies from the plan. There have been 5 shorter interruptions in operation caused by demand of the experiment, minor repairs and thunderstorm. Only one longer interruption was caused by difficulties in secondary water supply. The reactor was used for irradiation and experiments according to the demand of 590 users, of which 470 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1967, and a chart showing discrepancies from the plan. Data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 19, of which 11 were caused by power cuts, 6 due to voltage instabilities, and 2 due to failures of instrumentation. These data are compared to safety shutdown data from 1962 - 1967. There have been no accidents which could cause any significant effects. The only important incident occurred this year was caused by leaking of sulphur from an experimental capsule. It is described in detail. Detailed data concerning exposure of the personnel are part of this report. In spite of the fact that this year the spent fuel was for the first time packed and mixing of the fuel in the core there have been no unplanned difficulties nor contaminations.

  20. Operation and maintenance of the RA reactor in 1964, I-II, Part I; Pogon i odrzavanje reaktora RA u 1964. godini, I-II, I Deo

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    During 1964, the Reactor as operated about 20 days each months at nominal power of 6.5 MW, 5 days at lower power levels and 5 days were used for maintenance. Total production was 27930 MWh which is 11.7% higher than the planned value. Fuel exchange was done 3 times during this period, 98 spent fuel channels were exchanged. In addition to routine maintenance of reactor components and instruments a series of analyses of heavy water and helium were done. Special attention was devoted to corrosion analyses of the reactor materials because of the heavy water system was refurbished decontaminated in 1963. Utilization of the experimental space in the reactor was better that previously. 546 samples were irradiated till the end of November, of which 443 for users from the Institute. Specific irradiations in the fast neutron flux were done in six VISA-2 channels in the core.

  1. Operation and maintenance of the RA reactor, Report on operation in 1966, task 6.08; Pogon i odrzavanje reaktora RA, Izvestaj o radu u 1966. god. Zadatak 6.08

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D and others [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1966-12-15

    During 1966, RA reactor was operated at nominal power for 196 days and 28 days at lower power levels. The total production was 31015 MWh which is 3% higher than planned. Practically there were no discrepancies from the plan. The reactor was used for irradiation and experiments according to the demand of 644 users, of which 516 were from the Institute. This report contains detailed data about reactor power and experiments performed in 1966, and a chart showing discrepancies from the plan. data concerned about the utilization of reactor experimental channels are included as well. Total number of safety shutdowns was 37, of which 20 were caused by power cuts, 10 due to voltage instabilities, 4 due to human error and 3 due to failures of instrumentation. These data are compared to safety shutdown data of previous few years. There have been no accidents which could cause any significant effects. The incidents occurred during this year are described in detail. Detailed data concerning exposure of the personnel are part of this report.

  2. RA Reactor operation and maintenance (I-IX), Part II, Task 3.08/04; Pogon i odrzavanje reaktora RA (I-IX), II Deo, Zadatak 3.08/04

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    Repair and maintenance work of the RA reactor components and equipment was longer than planned due to the following reasons: chemical decontamination of the reactor heavy water system indispensable for maintenance of the heavy water pumps; findings of contamination origin changed the maintenance schedule; some construction materials of the heavy water pumps which caused contamination had to be removed; a number of the planned operations had to be performed under increase level of gamma radiation which increased the time needed for repair. This report covers detailed description of all the maintenance and repair work done from 25 Jan to 22 Apr 1963.

  3. Radiation protection at reactors RA and RB

    International Nuclear Information System (INIS)

    Ninkovic, M.

    2003-02-01

    Radiation protection activities at the RA and RB reactors are imposed by the existing legal regulations and international recommendations in this field. This annual report contains five parts which cover the following topics: Radiation safety, dosimetry control and technical radiation protection at reactors RA and RB; Handling of radioactive waste, actions and decontamination; Control of the environment (surroundings of RA and RB reactors) and meteorological measurements; Control of internal contamination and internal exposure; Health control od personnel exposed to radiation. Personnel as well as financial data are part of this report

  4. Report on participation of the operational dosimetry division in refurbishment of the RA reactor, Task 3.08/04-13; Podzadatak 3.08/04-13 Izvestaj o ucescu Odseka operativne dozimetrije RZ u remontnim radovima na Reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During the refurbishment of the RA reactor, from January to June 1963 the division of operational division had a very important role and comprehensive tasks. To enable safety of the staff it was necessary to provide protection clothes, personnel dosemeters; permanent monitoring of radiation doses; strict control of the procedures for completing the planned maintenance and repair operations to avoid contamination of the personnel and working space. The refurbishment activities described in this report are: removal of fuel from the core; refurbishment of the heavy water system; decontamination of the distillation equipment; repair of the gas system.

  5. RA reactor exploitation, task 3.08/01; Zadatak 3.08/01 - Eksploatacija reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    During 1963 the RA reactor was operated for 1852 hours at mean power of 5.7 MW (total power production was 10716 MWh). Reactor was used for irradiation according to the demand of 356 users, and 15 experiments. The reason for decreased operation in comparison with the previous year was repair of all the reactor equipment and decontamination of the heavy water system. This report contains detailed data about reactor power, reactivity changes and fuel burnup. Mean monthly usage of the reactor experimental channels as well as samples which were irradiated are part of this report.

  6. RA Research reactor, Annual report 1969

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1969-12-01

    During 1969, the RA Reactor was operated at nominal power of 6.5 MW for 200 days, and 15 days at lower power levels. Total production mounted to 31131 MWh which is 3.77% higher than planned. Reactor was used for irradiation and experiments according to the demand of 463 users from the Institute and 63 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. If there had been no problems with power supply during last three months and Danube low water level in September and October the past year would have been the most successful up to now. The number od scram shutdowns was not higher than during past two years in spite of the difficulties in the last quarter. There were three incidents which caused higher personnel exposure during operation. One, was the destruction of the canner with silver (because the time spent in the core was too long) which caused the surface contamination of the platform, the background radiation was 10 to 100 times higher than regular. The other two cases were caused by failure of the device for handling the fuel slugs in the fuel channels during refuelling. Reactor refuelling was done four times during 1969, and 499 fresh fuel slugs were used. Refuelling applied the approach of 'mixing' the fresh fuel slugs with the 'old' fuel slugs in the fuel channel. Decontamination of surfaces was on the same level as previously in spite of the problems with silver. Since two staff members have left, the present number od employees is now the minimum needed for reactor operation and maintenance. It is stated that the operation of components and equipment is on sufficiently high level after ten years of reactor operation. The action plan for 1970 is made according to the same principles as in previous four years but the planned production is decreased to 25000 MWh, because control of important components is needed after ten

  7. Chemical dosimetry at the RA reactor; Hemijska dozimetrija reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Gal, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    This report presents the results of measurements of absorbed doses axial and radial distribution in the vertical experimental channels of the RA reactor. Measurements were done in channels VK-5, VK-7, VK-9 and GF-36. Results were compared to the results of calorimetry measurements and measured neutron flux values performed by other laboratories. Fricke and oxalate dosemeters were used in addition to the cobalt indicators.

  8. RA-0 reactor. New neutronic calculations

    International Nuclear Information System (INIS)

    Rumis, D.; Leszczynski, F.

    1990-01-01

    An updating of the neutronic calculations performed at the RA-0 reactor, located at the Natural, Physical and Exact Sciences Faculty of Cordoba National University, are herein described. The techniques used for the calculation of a reactor like the RA-0 allows prediction in detail of the flux behaviour in the core's interior and in the reflector, which will be helpful for experiments design. In particular, the use of WIMSD4 code to make calculations on the reactor implies a novelty in the possible applications of this code to solve the problems that arise in practice. (Author) [es

  9. Measurements of neutron flux in the RA reactor

    International Nuclear Information System (INIS)

    Raisic, N.

    1961-12-01

    This report includes the following separate parts: Thermal neutron flux in the experimental channels od RA reactor; Epithermal neutron flux in the experimental channels od RA reactor; Fast neutron flux in the experimental channels od RA reactor; Thermal neutron flux in the thermal column and biological experimental channel; Neutronic measurements in the RA reactor cell; Temperature reactivity coefficient of the RA reactor; design of the device for measuring the activity of wire [sr

  10. RA reactor exploitation, task 3.08/01

    International Nuclear Information System (INIS)

    Zecevic, V.

    1963-01-01

    During 1963 the RA reactor was operated for 1852 hours at mean power of 5.7 MW (total power production was 10716 MWh). Reactor was used for irradiation according to the demand of 356 users, and 15 experiments. The reason for decreased operation in comparison with the previous year was repair of all the reactor equipment and decontamination of the heavy water system. This report contains detailed data about reactor power, reactivity changes and fuel burnup. Mean monthly usage of the reactor experimental channels as well as samples which were irradiated are part of this report

  11. RA Reactor operation and maintenance (I-IX), part V, Task 3.08/04-06, Refurbishment of the heavy water pumps

    International Nuclear Information System (INIS)

    Zecevic, V.; Nikolic, M.; Milic, J.

    1963-12-01

    In addition to detailed instructions for maintenance and repair of the heavy water pumps at the RA reactor this document includes nine annexes. They are as follows: cleaning the heavy water pump Avala with distilled water; instructions for repair of the pump CEN-132 (two annexes); list of operating characteristics of the pumps before repair; conclusions of the experts concerning the worn out bearings of the heavy water pump Avala, with the analysis of the stellite layer; report on the completed repair actions on the pumps Avala and CEN-132; report on the measurements done on the pump Avala; and the certificate concerning inspection of the pump

  12. Reactor operation

    CERN Document Server

    Shaw, J

    2013-01-01

    Reactor Operation covers the theoretical aspects and design information of nuclear reactors. This book is composed of nine chapters that also consider their control, calibration, and experimentation.The opening chapters present the general problems of reactor operation and the principles of reactor control and operation. The succeeding chapters deal with the instrumentation, start-up, pre-commissioning, and physical experiments of nuclear reactors. The remaining chapters are devoted to the control rod calibrations and temperature coefficient measurements in the reactor. These chapters also exp

  13. RA research reactor - properties and experimental capabilities; Istrazivacki reaktor RA - Tehnicke karakteristike i eksploatacione mogucnosti

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M; Martinc, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-05-15

    The brief survey of the Reactor RA exploitation experience, as well as the reactor equipment state, after 18 years of operation is presented. The results of efforts spent on reactor characteristics improvement in order to ensure safe and reliable reactor operation for next 15-20 years, are described. Prikazani su fragmenti iz eksploatacije reaktora kao i stanje opreme, posle 18 godina rada. Na kraju je dat prikaz sta je preduzeto i sta se preduzima da se poboljsaju karakteristike i poveca sigurnost i bezbednost rada za sledecih 15-20 godina.

  14. External irradiation of the personnel operating the reactor RA at Vinca in the period 1963-1966; Spoljasnje ozracivanje osoblja koje opsluzuje reaktor RA u Vinci u periodu 1963-1966

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M M; Minincic, Z [Institut za nuklearne nauke Vinca, Belgrade (Yugoslavia)

    1967-07-01

    The objective of this paper was the analysis of external radiation exposure of the personnel employed at the RA reactor in Vinca during past four years. During 1963 reactor was not operated because of the general repair and maintenance, and it was operated during 1964, 1965 and 1966. The internal irradiation and the estimation of the beta doses on the skin were not analysed in this paper, they should be treated by separate analyses. The evaluation of external irradiation covered only gamma radiation since yhe neutron doses were negligible. The analysis was based on the the irradiation dose data obtained by film and personal dosemeters. Predmet ovog rada je analiza spoljasnjeg ozracivanja osoblja koje je radilo na reaktoru RA u Vinci u poslednje cetiri godine, u toku kojih je reaktor bio u opstem remontu 1963, odnosno u normalnom radu 1964, 1965 i 1966. U ovom radu nismo se upustali u analizu unutrasnjeg ozracivanja, kao ni procenu doza beta zracenja na kozi, sto treba da bude predmet posebnih analiza. Pri proceni spoljasnjeg ozracivanja operisano je samo sa dozama gama zracenja, jer je ozracivanje neutronima zanemarljivo. Celokupna analiza izvrsena je na osnovu podataka o dozama ozracivanja do kojih se doslo ocitavanjem film o penkalo dozimetara.

  15. External irradiation of the personnel operating the reactor RA at Vinca in the period 1963-1966; Spoljasnje ozracivanje osoblja koje opsluzuje reaktor RA u Vinci u periodu od 1963. do 1966. godine

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M M; Minincic, Z [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1968-06-15

    The paper first gives a survey of the characteristic operations performed on the Vinca reactor RA in which most of the personnel become irradiated. Following is a schematic diagram of the irradiations in the period 1963-1966 in which the reactor was in continual operation. The surveys are given for each month and each year separately, while the irradiated personnel are grouped in several characteristic irradiation dose ranges. In this analysis special emphasis is given to a survey of irradiation of the personnel classified according to their profession, i.e. their post. This kind of analysis is indispensable in planning work, proper disposition of the personnel and undertaking special protective measures for reducing the irradiations (author) [Serbo-Croat] U radu je najpre dat pregled mesta na reaktoru RA, sa topografijom zracenja, na kojima radno osoblje pretezno biva ozracivano. Zatim su dati tabelarno i graficki pregledi ozracivanja za protekli period u kome je reaktor neprekidno radio, tj. od 1963. do 1966. god. Pregledi su dati po mesecima za svaku godinu i to tako sto su ozracivana lica razvrstavana u nekoliko karakteristicnih intervala doza ozracivanja. Posebno mesto u ovoj analizi zauzima pregled ozracivanja osoblja razvrstanog po strukama, odnosno radnim mestima. Ovakva analiza je nuzna za planiranje poslova, pravilan raspored radnog osoblja kao i preduzimanje posebnih zastitnih mera u cilju smanjivanja ozracivanja (author)

  16. Research nuclear reactor RA - Annual Report 1997; Istrazivacki nuklearni reaktor RA - Izvestaj za 1997. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Vinca Institute of Nuclear Sciences, Beograd (Serbia and Montenegro)

    1997-12-01

    RA reactor is not in operation since 1984, activities related to revitalisation of the RA reactor started in 1986. The planned actions related to renewal of the reactor components were finished except for the most important action, related to exchange of complete reactor instrumentation which was delayed. Only 80% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the sanctions imposed to our country. The existing RA reactor instrumentation was dismantled. Control and maintenance of the reactor components was done regularly and efficiently. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 42 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. The problem of financing the reactor activities and maintenance remains unsolved. Research reactor RA Annual report for year 1997 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] Reaktor RA nije u pogonu od 1984, aktivnosti na revitalizaciji, rekostrukciji i modernizaciji reaktorski sistema zapocete su 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i pouzdan rad ovog reaktora. Poslednji, i ujedno najveci zahvat, koji se odnosi na zamenu celokupne instrumentacije kasni zbog zastoja u isporuci opreme koja se izradjuje u Sovjetskom savezu. Do septembra 1991. godine isporuceno svega 80% od predvidjene kolicine. Od tada je svaka isporuka obustavljena, a razlog je privremena zabrana na sve isporuke opreme za Jugoslaviju usled sankcija uvedenih od strane organizacije Ujedinjenih nacija. Demontirana je postojeca instrumentacija. Kontrola i odrzavanje celopkupne opreme postrojenja, kao i remontni radovi izvrsavani su redovno i efikasno. Kontrola goriva od strane safeguard inspektora MAAE obavljana

  17. RA reactor building and installations; Zgrada 'RA' i instalacije

    Energy Technology Data Exchange (ETDEWEB)

    Badrljica, R; Sanovic, V; Skoric, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1985-08-15

    RA reactor building is made of reinforced concrete and bricks. It is closed facility with a limited number of controlled openings, doors and windows. The site of the building is 100 m above the sea level, 20 m above the mean Danube level and 8 m above the level of the neighbouring stream Mlaka. The building consists of three parts: central prismatic part, annex - surrounding the central part and the sanitary corridor. The biggest space is the reactor hall. In addition to the detailed description and drawings of the reactor building this documents includes design specifications of: electrical installation, water supply system, sewage system, ventilation and heating, gas and compressed air systems. A separate chapter is devoted to fire protection. Zgrada reaktora RA izgradjena je od armiranog betona i opeke, kao zatvoreni objekat ogranicenog broja kontolisanih otvora, sa ogranicenim brojem vrata i prozora. Plato na kojem je zgrada izgradjena nalazi se na 100 m nadmorske visine, na 20 m iznad srednjeg vodostaja Dunava i 8 m iznad nivoa obliznjeg potoka Mlaka. Zgrada se sastoji iz tri dela: sredisnjeg prizmaticnog dela, aneksa - prstenastog okvira sredisnog dela i sanitarnog propusnika. Pojedinacno najveci prostor zauzima reaktorska hala. Pored detaljnog opisa i plana zgrade, ovaj dokument sadrzi projekat elektricne instalacije, projekat vodovoda i kanalizacije, ventilacije i grejanja, instalacije gasa i komprimovanog vazduha. Posebno poglavlje posveceno je protivpozarnoj zastiti.

  18. Status of the RA research reactor decommissioning project

    International Nuclear Information System (INIS)

    Ljubenov, V.; Nikolic, D.; Pesic, M.; Milosevic, M.; Kostic, Lj.; Steljic, M.; Sotic, O.; Antic, D. . E-mail address of corresponding author: vladan@vin.bg.ac.yu; Ljubenov, V.)

    2005-01-01

    The 6.5 MW heavy water RA research reactor at the VINCA Institute of Nuclear Sciences operated from 1959 to 1984. After 18 years of extended shutdown in 2002 it was decided that the reactor shutdown should be final. Preliminary decommissioning activities have been initiated by the end of 2002 under the Technical Co-operation Programme of the International Atomic Energy Agency. The objective of the project is to implement safe, timely and cost-effective decommissioning of the RA reactor up to unrestricted use of the site. Decommissioning project is closely related to two other projects: Safe Removal of the RA Reactor Spent Nuclear Fuel and Radioactive Waste Management in VINCA Institute. The main phases of the project include preparation of the detailed decommissioning plan, radiological characterization of the reactor site, dismantling and removal of the reactor components and structures, decontamination, final radiological site survey and the documentation of all the activities in order to obtain the approval for unrestricted use of the facility site. In this paper a review of the activities related to the preparation and realization of the RA reactor decommissioning project is given. Status of the project's organizational and technical aspects as for July 2004 are presented and plans for the forthcoming phases of the project realization are outlined. (author)

  19. RA Research nuclear reactor, Part II - radiation protection at the RA nuclear reactor in 1984; Istrazivacki nuklearni reaktor RA - Deo II - zastita od zracenja kod nuklearnog reaktora RA u 1984. godini

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M; Ajdacic, N; Zaric, M; Vukovic, Z [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1984-12-15

    Radon protection tasks which enable safe operation of the RA reactor, and are defined according the the legal regulations and IAEA safety recommendations are sorted into four categories in this report: (1) Control of the working environment, dosimetry at the RA reactor; (2) Radioactivity control in the vicinity of the reactor and meteorology measurements; (3) Collecting and treatment of fluid effluents; and (4) radioactive wastes, decontamination and actions. Each category is described as a separate annex of this report.

  20. Calculated activities of some isotopes in the RA reactor highly enriched fuel significant for possible environmental contamination - Operational report; Radni izvestaj - Proracun aktivnosti nekih izotopa u visokoobogacenom uranskom gorivu reaktora RA, znacajnih sa gledista moguce kontaminacije okoline

    Energy Technology Data Exchange (ETDEWEB)

    Bulovic, V; Martinc, R; Cupac, S [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-12-15

    This report contains calculation basis and obtained results of activities for three groups of isotopes in the RA reactor 80% enriched fuel element. The following isotopes are included: 1) {sup 85m}Kr, {sup 87}Kr, {sup 88}Kr, {sup 131}J, {sup 132}J, {sup 133}J, {sup 134}J, {sup 135}J, {sup 133}Xe, {sup 138}Xe i {sup 138}Cs, 2) {sup 89}Sr, {sup 90}Sr, {sup 91}Sr, {sup 92}Sr, {sup 95}Zr, {sup 97}Zr, {sup 103}Ru, {sup 105}Ru, {sup 106}Ru, {sup 129m}Te, {sup 134}Cs, {sup 137}Cs, {sup 140}Ba, {sup 144}Ce, kao i 3) {sup 238}Pu, {sup 239}Pu i {sup 240}Pu. It was estimated that the fuel is exposed to mean neutron flux. The periodicity of reactor operation is taken into account. Calculation results are given dependent on the time of exposure. These results are to be used as source data for Ra reactor safety analyses. [Serbo-Croat] Izlozene su osnove i prikazani su rezultati izvedenog proracuna aktivnosti tri grupe izotopa u gorivnom elementu reaktora RA sa 80% obogacenim uranom - 235. Obuhvaceni su: 1) {sup 85m}Kr, {sup 87}Kr, {sup 88}Kr, {sup 131}J, {sup 132}J, {sup 133}J, {sup 134}J, {sup 135}J, {sup 133}Xe, {sup 138}Xe i {sup 138}Cs, zatim, 2) {sup 89}Sr, {sup 90}Sr, {sup 91}Sr, {sup 92}Sr, {sup 95}Zr, {sup 97}Zr, {sup 103}Ru, {sup 105}Ru, {sup 106}Ru, {sup 129m}Te, {sup 134}Cs, {sup 137}Cs, {sup 140}Ba, {sup 144}Ce, kao i 3) {sup 238}Pu, {sup 239}Pu i {sup 240}Pu. Pretpostavljeno je da se gorivo ozracuje na srednjem fluksu neutrona, a periodicnost rada reaktora je uvazavana. Rezultati proracuna, dati u numerickom obliku, sistematizovani su kao funkcija toka vremena ozracivanja goriva. Ovi rezultati bice korisceni kao izvorni podaci kod izrade sigurnosnih analiza za reaktor RA (author)

  1. Waste Management During RA Reactor Decommissioning

    International Nuclear Information System (INIS)

    Markovic, M.; Avramovic, I.

    2008-01-01

    The objective of radioactive waste management during the RA reactor decommissioning is to deal with radioactive waste in a manner that protects human health and the environment now and in the future. The estimation of waste quantities to be expected during decommissioning is a very important step in the initial planning. (author)

  2. Measurements of neutron flux in the RA reactor; Merenje karakteristika neutronskog fluksa u reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    This report includes the following separate parts: Thermal neutron flux in the experimental channels od RA reactor; Epithermal neutron flux in the experimental channels od RA reactor; Fast neutron flux in the experimental channels od RA reactor; Thermal neutron flux in the thermal column and biological experimental channel; Neutronic measurements in the RA reactor cell; Temperature reactivity coefficient of the RA reactor; design of the device for measuring the activity of wire. [Serbo-Croat] Ovaj izvestaj sadrzi sledece referate: Fluks termalnih neutrona u eksperimentalnim kanalima reaktora RA; Fluks epitermalnih neutrona u eksperimentalnim kanalima reaktora RA; Fluks brzih neutrona u eksperimentalnim kanalima reaktora RA; Fluks termalnih neurona u termalnoj koloni i bioloskom eksperimentalnom kanalu; Neutronska merenja u elementarnoj celiji reaktora RA; Temperaturni koeficijent reaktivnosti reaktora RA; Projekat uredjaja za merenje radioaktivnosti zice.

  3. Safety shutdowns and failures of the RA reactor equipment; Sigurnosna zaustavljanja i kvarovi opreme na reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Mitrovic, S [Institut za nuklearne nauke ' Boris Kidric' , Vinca, Belgrade (Yugoslavia)

    1966-07-01

    This report is an attempt of statistical analysis of the failures occurred during RA reactor operation. A list of failures occurred on the RA equipment during 1965 is included. Failures were related to the following systems: dosimetry system (22%), safety and control system (7%), heavy water system (2%), technical water (4%), helium system (2%), measuring instruments (30%), transport, ventilation, power supply systems (32%). A review of safety shutdowns from 1962 to 1966 is included as well, as a comparison with three similar reactors. Although the number of events used for statistical analysis was not adequate, it has been concluded that RA reactor operation was stable and reliable.

  4. Implementation of a reactivity meter for the RA-6 reactor

    International Nuclear Information System (INIS)

    Herzovich, P.F.

    1991-06-01

    An 'on line' and 'off line' digital reactivity meter was developed and implemented for the RA-6 research reactor. Safety and control rod calibration will be permitted by means of this system with the same precision and faster than the period method, becoming a helpful tool to the operator in critical approach and in experimental design. (Author) [es

  5. Research nuclear reactor RA - Annual report 1992; Istrazivacki nuklearni reaktor RA - Izvestaj za 1992. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-12-01

    Research reactor RA Annual report for year 1992 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. Second annex B is a paper by Z. Vukadin 'Recurrence formulas for evaluating expansion series of depletion functions' published in 'Kerntechnik' 56, (1991) No.6 (INIS record no. 23024136. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data. [Serbo-Croat] Godisnji izvestaj o radu nuklearnog reaktora RA za 1992. godinu sastoji se od dva dela: prvi deo obuhvata pogon i odzavanje reaktora RA, a drugi poslove zastite od zracenja na reaktoru RA. Prvi deo sadrzi 8 priloga, koji opisuju rad reaktora i poslove sluzbi za odrzavanje opreme i komponenti, finansijski izvestaj, kadrovsku strukturu osoblja reaktora. Drugi prilog (B) je rad Z. Vukadina 'Recurrence formulas for evaluating expansion series of depletion functions' objavljen u casopisu Kerntechnik, 1991. Drugi deo izvestaja o poslovima zastite od zracenja sadrzi 4 priloga sa podacima radijacione kontrole radne sredine i okoline reaktora, opis poslova dekontaminacije i sakupljanja radioaktivnih materija, kao i meteoroloske podatke.

  6. RA reactor safety analysis, Part II - Accident analysis; Analiza sigurnosti rada Reaktora RA I-III, Deo II - Analiza akcidenta

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Radanovic, Lj; Milovanovic, M; Afgan, N; Kulundzic, P [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    This part of the RA reactor safety analysis includes analysis of possible accidents caused by failures of the reactor devices and errors during reactor operation. Two types of accidents are analyzed: accidents resulting from uncontrolled reactivity increase, and accidents caused by interruption of cooling.

  7. RA Research nuclear reactor - Annual report 1987; Istrazivacki nuklearni reaktor RA - Izvestaj o radu za 1987. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-12-15

    Annual report concerning the project 'RA research nuclear reactor' for 1987, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1987. godinu, koji finansira republicka zajednica za nauku SR Srbije po ugovoru br. 3509/1 sastoji se iz dva dela. Prvi deo obuhvata pogon i odrzavanje nuklearnog reaktora RA, sto predstavlja obavezu Odeljenja za reaktorski inzenjering u sastavu OOUR Instituta za multidisciplinarna istrazivanja i inzenjering RA. Drugi deo obuhvata poslove zastite od zracenja na reaktoru RA, sto predstavlja obavezu OOUR Instituta za zastitu od zracenja 'Zastita'. Naucno vece Instituta za multidisciplinarna istrazivanja i inzenjjring RA ocenilo je da sadrzina ovog izvestaja odgovara izvrsenim poslovima na reaktoru RA u 1989. godini. Pozitivno se ocenjuje obim i kvalitet izvrsenih radova kako u pogledu odrzavanja i rekonstrukcije reaktora, tako i u pogledu poslova zastite od zracenja izvrsenih kod njega.

  8. Operation and maintenance of the RA Reactor in 1985, Part 1, Annex B - Report of the Technology Service; Deo 1 - Pogon i odrzavanje nuklearnog reaktora RA u 1985. godini - Prilog B - Izvestaj o radu tehnoloske sluzbe

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Vukadin, Z; Stosic, O; Cupac, S [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1985-12-01

    Technology service is established according to the need of unified technology control of the reactor, based on the organizational structure developed in USA, a part of which was applied at the Krsko NPP. Tasks of this service are: regular control and recording of operating reactor parameters under steady state and accidental conditions; control of chemical state of the reactor core (control of Ph values and electro conductivity of the heavy water and technical water); dosimetry parameters control and recording; safety and optimisation analyses when planning reactor core modifications; (changing the type of fuel, design of new components); cooperation with the reactor users during isotope production, activation analyses, application of neutron beams; participating in research programs; planning refueling. The most important task performed by this service was conversion of the core from 2% to 80% enriched fuel elements. A methodology for optimizing the reactor application was developed. Operation of the heavy water purification system, heavy water parameters, and operation of the gas system were controlled. Radiation and contamination levels in the working environment were measured, individual and collective doses. [Serbo-Croat] Tehnoloska sluzba uspostavljena je u skladu sa ispoljenim potrebama jedinstvene tehnoloske kontrole reaktora, oslanjajajucui se na organizacionu semu koja je razvijena u SAD, a cija je jedna varijanta primenjena na NE Krsko. Zadaci sluzbe su obavljanje sledecih zadataka: redovna kontrola i evidencija radnih parametara reaktora u redovnim i akcidentalnim uslovima; kontrola hemijskog rezima u reaktoru (kontrola PH vrednosti i elektroprovodnosti teske i tehnicke vode); kontrola i evidencija tehnicke dozimetrije; sigurnosne i optimizacione analize prilikom planiranja izmena na reaktoru (promene vrste goriva, izgradnja novih elemenata opreme); saradnja sa korisnicima reaktora prilikom prozivodnje izotopa, aktivacione analize, koriscenja

  9. Research nuclear reactor RA - Annual Report 1991; Istrazivacki nuklearni reaktor RA - Izvestaj za 1991. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1992-01-01

    Activities related to revitalisation of the RA reactor stared in 1986, were continued in 1991. A number of interventions on the reactor components were finished that are supposed to enable continuous and reliable operation. The last, and at the same time largest action, related to exchange of complete reactor instrumentation is underway, but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Construction of some support elements is almost finished by the local staff. The Institute has undertaken this activity in order to speed up the ending of the project. If all the planned instrumentation would not arrive until the end of March 1992, it would not be possible to start the RA reactor testing operation in the first part of 1993, as previously planned. In 1991, 53 staff members took part in the activities during 1991, which is considered sufficient for maintenance and repair conditions. Research reactor RA Annual report for year 1991 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] U 1991. godini nastavljeni su poslovi na revitalizaciji reaktora RA, zapocetoj 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i pouzdan rad ovog reaktora. Poslednji, i ujedno najveci

  10. Safety analysis for testing operation of the RA reactor in the Boris Kidric Institute, Vinca; Analiza sigurnosti rada reaktora 'RA' za probni rad u Institutu za nuklearne nauke 'Boris Kidric' - Vinca

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-09-15

    This safety report covers detailed description of the RA reactor core, reactor components, coolant system, control system, safety system, reactor building including site characteristics. A separate chapter is devoted to radiation protection and radioactive waste management. Organizational structure od the reactor staff as well as training program are included. The last chapter includes detailed emergency plans for three accidents classified in three categories. [Serbo-Croat] Ovaj izvestaj sadrzi detaljan opis reaktora RA, sistema za hladjenje, kontolno-sigurnosnog sistema, elektricnog sistema, zgrade sa instalacijama, ukljucujuci karakteristike lokacije. Posebno poglavlje opisuje sistem zastite od zracenja i rukovanje radioaktivnim otpadom. Opisana je organizacija rada i program obuke osoblja. Poslednje poglavlje sadrzi detaljan plan mera za slucaj udesa klasifikovanih u tri kategorije.

  11. RA Reactor operation and maintenance (I-IX), Part III, Task 3.08/04-02 Refurbishment of the electrical equipment; Pogon i odrzavanje reaktora RA (I-IX), III Deo, Zadatak 3.08/04-02 Remont elektro opreme

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V; Nikolic, M; Poznanovic, B; Rajic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    This volume contains detailed action plan for repair of electrical equipment of the RA reactor, the list of electrical equipment parts which were either repaired or exchanged for improvement of their performance. Detailed work describing the repair and maintenance work done of the listed equipment is part of this report. Equipment related to dosimetry and control systems are included as well.

  12. RA-0 reactor. New neutronic calculations; Reactor RA-0. Nuevos calculos neutronicos

    Energy Technology Data Exchange (ETDEWEB)

    Rumis, D; Leszczynski, F

    1991-12-31

    An updating of the neutronic calculations performed at the RA-0 reactor, located at the Natural, Physical and Exact Sciences Faculty of Cordoba National University, are herein described. The techniques used for the calculation of a reactor like the RA-0 allows prediction in detail of the flux behaviour in the core`s interior and in the reflector, which will be helpful for experiments design. In particular, the use of WIMSD4 code to make calculations on the reactor implies a novelty in the possible applications of this code to solve the problems that arise in practice. (Author). [Espanol] En este trabajo se actualizan los calculos neutronicos realizados para el reactor RA-0, instalado en la Facultad de Ciencias Exactas, Fisicas y Naturales de la Universidad Nacional de Cordoba. Se describen los calculos realizados hasta la fecha y los resultados obtenidos. Las tecnicas incorporadas al calculo de un reactor como el RA-0 permiten predecir en detalle el comportamiento del flujo en el interior del nucleo y en el reflector, lo que sera una importante ayuda en el diseno de experimentos. En particular, el empleo del codigo WIMSD4 para calculos del reactor completo constituye una novedad en las posibles aplicaciones de ese codigo para resolver problemas que se presentan en la practica. (Autor).

  13. Research nuclear reactor RA - Annual Report 1994; Istrazivacki nuklearni reaktor RA - Izvestaj za 1994. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1994-12-01

    Activities related to revitalisation of the RA reactor stared in 1986, were continued in 1991. A number of interventions on the reactor components were finished that are supposed to enable continuous and reliable operation. The last, and at the same time largest action, related to exchange of complete reactor instrumentation is underway, but it is behind the schedule in 1991 because the delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. In 1991 most of the existing RA reactor instrumentation was dismantled, only the part needed for basic measurements when reactor is not operated, was maintained. Activities related to improvement of Russian project were continued in 1994. Control and maintenance of the reactor components was done regularly and efficiently. Extensive repair of the secondary coolant loop is almost finished and will be completed in the first part of 1995 according to existing legal procedures and IAEA recommendations. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 47 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. Research reactor RA Annual report for year 1991 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] U 1994. godini nastavljeni su poslovi na revitalizaciji reaktora RA, zapocetoj 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i

  14. RA reactor kinetic parameters - Progress report; Kineticki parametri reaktora RA - Izvestaj o napredovanju -

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, M; Obradovic, D; Jevtovic, V; Velickovic, Lj [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1965-11-15

    The objective of nuclear reactor kinetics study is to analyze the stability of reactor operation in practice. The obtained parameters should define the needed properties of automatic control system relevant for the stability of the designed reactor system. Refining the analytical models is done by using the analysis and interpretation of experimental data. Results of measured the reactor response obtained by using the reactor oscillator ROB-1 are explained by using the space independent model of the zero power reactor, by power reactor model with one feedback circuit, and by a complex model. It was assumed that the perturbations of the system are small and that linearized kinetic equations could be used. Linearized kinetic equation of the reactor system are transformed into the frequency region in order to analyze the measured values directly. The objective of this paper is to measure the RA reactor kinetics parameters, and analyze the stability of reactor operation at power levels high than nominal. Istrazivanja u oblasti kinetike nuklearnih reaktora imaju za cilj da dovedu analizu stabilnosti rada reaktora na nivo 'radne tehnologije'. Dobijeni pararametri treba da specificiraju potrebne karakteristike sistema automatske kontrole za odgovarajucu stabilnost projektovanog reaktorskog sistema. Doterivanjem analitickih modela do takvog nivoa da se zapazeni fenomeni mogu anailitcki predvideti ide preko analize i interpretacije eksperimentalnih podataka. Eksperimentalni rezultati merenja odziva reaktora, izvedeni reaktorskim oscilatorom ROB-1, interpretirani su na osnovu prostorno nezavisnog modela za reaktor nulte snage, modelom reaktora snage sa jednim kolom povratne sprege, kao i kompleksnim modelom. U ovom radu se poslo od toga da su perturbacije parametara sistema male, pa se mogu upotrebiti linearizovane kineticke jednacine. Linearizovane kineticke jednacine reaktorskog sistema transformirane su u frekventno podrucje s ciljem direktne analize mernih rezultata

  15. Research nuclear reactor RA - Annual Report 1996; Istrazivacki nuklearni reaktor RA - Izvestaj za 1996. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1996-12-01

    Activities related to revitalisation of the RA reactor started in 1986, were continued in 1996. All the planned actions related to renewal of the reactor components were finished. The last, and at the same time most important action, related to exchange of complete reactor instrumentation is underway, delayed. The delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 80% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. The existing RA reactor instrumentation was dismantled. Control and maintenance of the reactor components was done regularly and efficiently. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 43 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. The problem of financing the reactor activities and maintenance remains unsolved. Research reactor RA Annual report for year 1996 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] U toku 1996. godine nastavljeni su poslovi na revitalizaciji reaktora RA, zapocetoj 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i pouzdan rad ovog reaktora. Poslednji, i ujedno najveci zahvat, koji se odnosi na zamenu celokupne instrumentacije kasni zbog zastoja u isporuci opreme koja se izradjuje u Sovjetskom savezu. Izradu ove opreme finansira Medjunarodna agencija za atomsku energiju kroz ugovor sklopljen decembra 1988. godine sa moskovskom firmom Atomenergoexport. Prema tom

  16. Nuclear Reactor RA Safety Report, Format and Contents

    International Nuclear Information System (INIS)

    1986-11-01

    This is a new complete version of the safety report of nuclear reactor RA is made according to the recommendations of the IAEA. Report includes all the relevant data needed for evaluation of safe operation of this nuclear facility. Each of seven volumes of this report cover separate topics as follows: (1) introduction; (2) Site characteristics; (3) description of the reactor building and installations; (4) description of the reactor; (5) description of the coolant system; (6) description of the regulation and safety instrumentation; (7) description of the power supply system; (8) description of the auxiliary systems; (9) radiation protection issues; (10) radioactive waste management (11) reactor operation; (12) accident analysis during previous operation; (13) analysis of possible accident causes; (14) safety analysis and preventive actions: (15) analysis of significant accidents; (16) analysis of maximum possible accident; (17) environmental impact analysis in case of accident [sr

  17. Operational report, Advantages of gradual introducing of highly enriched fuel into the RA reactor core from economic aspect and users needs; Radni izvestaj, Prednost postupka parcijalnog uvodjenja visokoobogacenog goriva u reaktor RA sa aspekta ekonomicnosti i potreba korisnika

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-10-14

    The possibility of increasing the neutron flux in the RA reactor was considered for a number of years. The possibilities of reactor reconstruction are not realistic and they should be disregarded. The possibility that remains is to achieve higher neutron flux by improving the fueling scheme and above all by introducing highly enriched fuel into the reactor core. Decision to purchase highly enriched fuel was quicker due to the fact that the 2% enriched uranium fuel is not fabricated any more. There are two procedures for exchanging the fuel in the reactor core: a) removal of partially spent 2% enriched fuel and formation of the core with fresh highly enriched fuel; b) gradually introducing the new fuel into the existing RA reactor core according to a special transfer regime. This report includes some comparative analyses of these two procedures from both economic point of view and the needs of users, as well as some technical conditions. These results are in favour of gradual introducing of new fuel into the reactor core. relevant direct savings amount to 3 000 000 dinars. Some of the most important advantages cannot be estimated in this way. This report does not cover the safety analyses results which are presented in a series of other papers. [Serbo-Croat] Vec vise godina razmatra se mogucnost za povecanje neutronskog fluksa u reaktoru RA. Mogucnosti za rekonstrukciju reaktora RA u tom smislu su minimalne i realno ih treba odbaciti. Prema tome preostaje da se povecanje neutronskog fluksa postigne usavrsavanjem seme izmene goriva, a pre svega uvodjenjem goriva sa visokim stepenom obogacenja u reaktor RA. Donosenje odluke o nabavci visokoobogacenog goriva i njegovom uvodjenju u reaktor ubrzano je i cinjenicom da se staro 2% obogaceno uransko gorivo vise ne proizvodi. Postoje dva postupka za prevodjenje reaktora na ovo gorivo: a) Uklanjanjem poluistrosenog 2% obogacenog goriva iz reaktora i formiranjem jezgra iskljucivo od svezeg visokoobogacenog goriva, b

  18. Description of the RA-3 research reactor as a model facility

    International Nuclear Information System (INIS)

    Vicens, Hugo E.; Quintana, Jorge A.

    2001-01-01

    The Argentine RA-3 reactor is described as a model facility for the information to be provided to the IAEA in accordance with the requirements of the Model Additional Protocol. RA-3 reactor was designed as a 5 MW swimming pool reactor, moderated and cooled with light water. Its fuel was 90% enriched uranium. The reactor started its operation in 1967, has been modified and improved in many components, including the core, that now is fueled with moderately enriched uranium

  19. Measurements of neutron flux in the RA reactor; Merenje karakteristika neutronskog fluksa u reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    This report includes results of the following measurements performed at the RA reactor: thermal neutron flux in the experimental channels, epithermal and fast neutron flux, neutron flux in the biological shield, neutron flux distribution in the reactor cell.

  20. RA Reactor operation and maintenance (I-IX), part VIII, Task 3.08/05, Decontamination of the reactor; Pogon i odrzavanje reaktora (I-IX), VIII Deo, Zadatak 3.08/05 Dekontaminacija reaktora

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    Permanent increase of radiation in the heavy water system was noticed during first three year of the RA reactor operation, even when the reactor was shutdown. It was found that there was no failure of the fuel element cladding. Radioactive cobalt was found in the heavy water which was rather strange. During repair of the heavy water system, it has been found that stellite was used for coating the heavy water pumps. Since stellite is a cobalt alloy, this could have been the source of radioactive cobalt in the heavy water. The stellite coating was damaged due to friction and particle of cobalt appeared in the coolant, they were activated since they were in the core. decontamination of the heavy water and the heavy water coolant loop was a must . Beside the detailed report on the contamination and decontamination of the heavy water system this volume includes 14 annexes describing the investigation of the event and the whole procedure of decontamination.

  1. Kinetic parameters of the RB and RA reactors

    Energy Technology Data Exchange (ETDEWEB)

    Petrovic, M; Obradovic, D [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1965-12-15

    In the paper the expressions for transfer functions of the zero power reactors, as well as power reactors of the RA reactor type are given, based on the space independent model. The modulation method for reactor transfer function measurements is explained. The results of the measurement and interpretation are given. The measurement were done on the RB and RA reactors in 'Boris Kidrich' Institute for Nuclear Sciences in Vincha (author)

  2. RA reactor action plan for 1977 - Annex VI; Prilog VI - Plan rada reaktora RA za 1977. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1976-12-15

    In the RA reactor action plan for 1977 it is foreseen that the reactor would be operated for 181 days, mostly at nominal power of 6.5 MW. It is planned to produce 28236 MWh in total. Five reactor core exchanges (refuelling) are planned. The plan includes time for repair of components as well as for cooling. [Serbo-Croat] Plan rada reaktora RA predvidja rad tokom 181 dana, vecim delom na nominalnoj snazi od 6,5 MW tokom 1977. godine. Planirano je da ukupni rad iznosi 28236 MWh. Planom je predvidjeno i pet izmena goriva kao i vreme potrebno za remont opreme i hladjenje.

  3. Reproduction of the RA reactor fuel element fabrication; Reprodukcija izrade gorivnog elementa za reaktor RA

    Energy Technology Data Exchange (ETDEWEB)

    Novakovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    This document includes the following nine reports: Final report on task 08/12 - testing the Ra reactor fuel element; design concept for fabrication of RA reactor fuel element; investigation of the microstructure of the Ra reactor fuel element; Final report on task 08/13 producing binary alloys with Al, Mo, Zr, Nb and B additions; fabrication of U-Al alloy; final report on tasks 08/14 and 08/16; final report on task 08/32 diffusion bond between the fuel and the cladding of the Ra reactor fuel element; Final report on task 08/33, fabrication of the RA reactor fuel element cladding; and final report on task 08/36, diffusion of solid state metals. Ovaj rad sadrzi devet priloga: 1. Zavrsni izvestaj o podzadatku 08/12, ispitivanje elementa goriva reaktora RA; 2. Koncepcija izrade gorivnog elementa reaktora RA; 3. Ispitivanje mikrostrukture gorivnog elementa reaktora RA; 4. Zavrsni izvestaj o podzadatku 08/13, dobijanje binarnih legura urana sa legirajucim komponentama Al, Mo, Zr, Nb i B; 5. Dobijanje legure U-Al; 6. Zavrsni izvestaj o podzadacima 08/14 i 08/16; 7. Zavrsni izvestaj o podzadatku 08/32, difuziona veza goriva i kosuljice gorivnog elementa reaktora RA; 8. Zavrsni izvestaj o podzadatku 08/33, izrada kosuljice gorivnog elementa reaktora RA; 9. Zavrsni izvestaj o podzadatku 08/36, difuzija kod metala u cvrstom stanju.

  4. RA research reactor in 'Vinca' Institute-approach to the decommissioning

    International Nuclear Information System (INIS)

    Ljubenov, V.Lj.; Pesic, M.P.; Sotic, O.

    2002-01-01

    In this paper short overview of decommissioning process of research reactors according to IAEA standards and world practice is given. Basic technical characteristics and details of operational history of the RA research reactor in Vinca Institute of Nuclear Sciences are present. The main nuclear and radiation safety problems related to the RA reactor facility are defined and the outlines of the future decommissioning project are proposed. (author)

  5. CAC-RA1 1958-1998. The first years of the Constituyentes Atomic Center (CAC). History of the first Argentine nuclear reactor (RA-1)

    International Nuclear Information System (INIS)

    Forlerer, Elena; Palacios, Tulio A.

    1998-01-01

    After giving the milestones of the development of the Constituyentes Atomic Center since 1957, the history of the construction of the first nuclear reactor (RA-1) in Argentina, including the local fabrication of its fuel elements, is surveyed. The RA-1 reached criticality on January 17, 1958. The booklet commemorates the 40th year of the reactor operation

  6. Experimental RA reactor operation with 80% enriched fuel - Program of experimental operation: a) Program of experimental operation with 80% enriched fuel at low power, b) contents of the experimental operation with 80% enriched fuel at higher power levels; Program probnog rada: a) Program probnog rada reaktora sa 80% obogacenim gorivom na malim snagama, b) sadrzaj programa probnog rada reaktora RA sa 80% obogacenim gorivom na vecim snagama

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Sotic, O; Skoric, M; Cupac, S; Bulovic, V; Maric, I; Marinkov, L [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1980-10-15

    Highly enriched (80%) uranium oxide fuel was regularly used in the mixed reactor core with the 2% enriched fuel since 1976. The most important changes related to reactor operation, in comparison with the original design project were related to reactor core fuelling schemes. At the end of 1979 reactor was shutdown due to the corrosion coating noticed on some fuel elements and due to decrease quality of the heavy water. Subsequently the Sanitary inspector of Serbia has prohibited further reactor operation. Restart of the reactor will not be a simple continuation of operation. It is indispensable to perform complete experimental program including measurements of critical parameters at different power levels for the core with fresh 80% enriched fuel. The aim of this document is to obtain working permission and its contents are in agreement with the procedure demanded by the Safety Committee of the Institute. It includes results of optimization and safety analysis for the initial reactor core. Since the permission for restart is not obtained, a separate RA reactor safety report is prepared in addition to the program for experimental operation. This report includes: detailed program for reactor experimental operation with 80% enriched fuel in the core at low power levels, and contents of the experimental operation with 80% enriched fuel in the core at higher power levels. [Serbo-Croat] Od decembra 1976. godine redovno je korisceno 80% obogaceno gorivo u mesanoj resetki reaktorskog jezgra sa 2% obogacenim gorivom. Najvece izmene na reaktoru u odnosu na originalni projekat izvrsene su u nacinu rukovanja gorivom. Krajem marta 1979. godine obustavljen je rad reaktora usled naslaga na gorivnim elementima i loseg stanja teske vode. Naknadno je izdata zabrana za rad reaktora od strane Sanitarnog inspektora SR Srbije. Ponovno pustanje reaktora u rad nece biti jednostavan nastavak rada. Neophodno je da se izvede kompletan program merenja kriticnih parametara i drugih

  7. Measurements at the RA Reactor related to the VISA-2 project - Part 1, Start-up of the RA reactor and measurement of new RA reactor core parameters

    International Nuclear Information System (INIS)

    Markovic, H.

    1962-07-01

    The objective of the measurements was determining the neutron flux in the RA reactor core. Since the number of fuel channels is increased from 56 to 68 within the VISA-2 project, it was necessary to attain criticality of the RA reactor and measure the neutron flux properties. The 'program of RA reactor start-up' has been prepared separately and it is included in this report. Measurements were divided in two phases. First phase was measuring of the neutron flux after the criticality was achieved but at zero power. During phase two measurements were repeated at several power levels, at equilibrium xenon poisoning. This report includes experimental data of flux distributions and absolute values of the thermal and fast neutron flux in the RA reactor experimental channels and values of cadmium ratio for determining the neutron epithermal flux. Data related to calibration of regulatory rods for cold un poisoned core are included [sr

  8. Project RA Research nuclear reactor - Annual report 1993 with comparative review for the period 1991 - 1993

    International Nuclear Information System (INIS)

    1993-12-01

    Research reactor RA Annual report for year 1993 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. The ninth separate annex deals with the feasibility of RA reactor applications. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data [sr

  9. Reproduction of the RA reactor fuel element fabrication

    International Nuclear Information System (INIS)

    Novakovic, M.

    1961-12-01

    This document includes the following nine reports: Final report on task 08/12 - testing the Ra reactor fuel element; design concept for fabrication of RA reactor fuel element; investigation of the microstructure of the Ra reactor fuel element; Final report on task 08/13 producing binary alloys with Al, Mo, Zr, Nb and B additions; fabrication of U-Al alloy; final report on tasks 08/14 and 08/16; final report on task 08/32 diffusion bond between the fuel and the cladding of the Ra reactor fuel element; Final report on task 08/33, fabrication of the RA reactor fuel element cladding; and final report on task 08/36, diffusion of solid state metals [sr

  10. Online monitoring and diagnostic system on RA-6 nuclear reactor

    International Nuclear Information System (INIS)

    Garcia Peyrano, O. A.; Marticorena, M.; Koch, R. G.; Martinez, J. S; Berruti, G. E.; Nunez, W. M.; Gonzales, L. A.; Tarquini, L. D.; Sotelo, J. P

    2009-01-01

    This paper presents the Online Automatic Monitoring and Diagnostic System for mechanical components, installed on RA-6 Nuclear Reactor (San Carlos de Bariloche, Argentina). This system has been designed, installed and set-up by the Vibrations and Mechatronics Laboratory (Centro Atomico Bariloche, Comision Nacional de Energia Atomica) and Sitrack.com Argentina SA. This system provides an online mechanical diagnostic of the main reactor components, allowing incipient failures to be early detected and identified, avoiding unscheduled shut-downs and reducing maintenance times. The diagnostic is accomplished by an online analysis of the vibratory signature of the mechanical components, obtained by vibrations sensors on the main pump and the decay tank. The mechanical diagnostic and the main operational parameters are displayed on the reactor control room and published on the internet. [es

  11. Calculation of research reactor RA power at uncontrolled reactivity changes

    International Nuclear Information System (INIS)

    Cupac, S.

    1978-01-01

    The safety analysis of research reactor RA involves also the calculation of reactor power at uncontrolled reactivity changes. The corresponding computer code, based on Point Kinetics Model has been made. The short review of method applied for solving kinetic equations is given and several examples illustrating the reactor behaviour at various reactivity changes are presented. The results already obtained are giving rather rough picture of reactor behaviour in considered situations. This is the consequence of using simplified feed back and reactor cooling models, as well as temperature reactivity coefficients, which do not correspond to the actual reactor RA structure (which is now only partly fulfilled with 80% enriched uranium fuel). (author) [sr

  12. Temperature reactivity coefficient of the RA reactor; Temperaturni koeficijenat reaktivnosti reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Strugar, P; Dobrosavljevic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Temperature reactivity coefficient of the RA reactor was determined as follows. Stabilization of moderator temperature and graphite reflector was achieved in the reactor operated at power levels of 20, 100, 500, 1000, 3000 and 5000 kW. Temperature change of the moderator was achieved by changing the water flow rate in the secondary cooling system. The fuel temperature was changed simultaneously. During the measurement at each power level the temperature change was between 30 - 50 deg C. Changing the position of the automated regulator is registered during moderator temperature change, and these changes were used for determining the total reactivity change by using the calibration curves for the automated regulator. In the measured temperature range the the reactivity change was linear and it was possible to determine the total temperature coefficient.

  13. IV Training program for the staff of the laboratory for the RA reactor exploitation; IV Programi obuke osoblja Laboratorije za eksploataciju reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-07-01

    All the staff members of the laboratory for RA reactor exploitation are obliged to learn the following: fundamental properties of the RA reactor, the role and functionality of the reactor components, basic and auxiliary reactor systems, basics of radioactivity, measures for preventing contamination. The personnel working in shifts must be acquainted with the regulations and instructions for reactor operation. Training programs for reactor operators, mechanics, electricians, instrumentators and dosimetrysts are described separately. Svi saradnici Laboratorije za eksploataciju reaktora RA moraju poznavati sledece oblasti: Osnovne karakeristike reaktora RA, princip rada, ulogu i funkcionisanje komponenti reaktora, osnovnih i pomocnih sistema reaktora; osnovne pojmove o radioaktivnom zracenju, mere za sprecavanje kontaminacije. Osoblje koje radi u smenama mora dodatno poznavati propise i uputstva za rad reaktora. Posebno je naveden program obuke operatora reaktora, mehanicara, electricara, instrumentatora, dozimetrista.

  14. Research nuclear reactor RA - Annual Report 1990 with the comparative evaluation for the period 1986-1990

    International Nuclear Information System (INIS)

    Sotic, O.

    1990-12-01

    Annual report concerning the project 'RA research nuclear reactor' for 1990, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities [sr

  15. Opinion about difficulties of RA reactor operation under conditions of high activity of the heavy water system - Annex 2; Prilog 2 - Misljenje o teskocama eksploatacije reaktora RA u uslovima visoke aktivnosti teskovodnog sistema

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    It was concluded that reactor the reactor operation is very dangerous for the reactor installation as well as safety of the staff under conditions of heavy water increased activity. Two fundamental arguments in favour of this conclusion are: insufficient possibility of reactor components inspection during maintenance and operation in the future period; difficulties in prevention of accidents that could occur is equally dangerous for the reactor facility and the environment. Cleaning and decontamination of the complete heavy water system is needed before the reactor operation starts in order to avoid possible failures or accidental events. [Serbo-Croat] Zakljuceno je da je eksploatacija reakora u uslovima postojece aktivnosti teskovodnog sistema veoma opasna po sam reaktor i po personal. Dva osnovna razloga u prilog ovog zakljucka su: nedovoljna mogucnost kontrole ispravnosti svih elemenata reaktora u toku remonta i ekspolatacije u predstojecem periodu; teskoca borbe sa udesima, koji bi se eventualno dogodili podjednako je opasna po instalaciju i okolinu. Pre no sto se nastavi sa daljom ekspolatacijom reaktora potrebno ciscenje, dekontaminacija sistema teske vode kako bi se izbegla moguca ostecenja ili akcidentalne situacije.

  16. Argentina: Disposal aspects of RA-1 research reactor decommissioning waste

    Energy Technology Data Exchange (ETDEWEB)

    Harriague, S; Barberis, C; Cinat, E; Grizutti, C; Scolari, H [Comision Nacional de Energia Atomica, Buenos Aires (Argentina)

    2007-12-15

    The objective of the project is to analyze disposal aspects of waste from total dismantling of Argentinean research reactors, starting with the oldest one, 48 years old RA-1. In order to estimate decommissioning waste, data was collected from files, area monitoring, measurements, sampling to measure activity and composition, operational history and tracing of operational incidents. Measurements were complemented with neutron activation calculations. Decommissioning waste for RA-1 is estimated to be 71.5 metric tons, most of it concrete (57 tons), the rest being steels, lead and reflector graphite (4.8 tons). Due to their low specific activities, no disposal problems are foreseen in the case of metals and concrete. Disposal of aluminium, steel, lead and concrete is analyzed. On the contrary, as the country has no experience in managing graphite radioactive waste, work was concentrated on that material. Stored (Wigner) energy may exist in RA-1 graphite reflectors irradiated at room temperature. Evaluation of stored energy by calorimetric methods is proposed, and its annealing by inductive heating; HEPA filters should be used to deal with gaseous activity emissions, mainly Cl-36 and C-14. Galvanic corrosion, dust explosion, ignition and oxidation can be addressed and should not become disposal problems. Care must be taken with graphite dust generation and disposal, due to wetting and flotation problems. Lessons learned from the project are presented, and the benefits of sharing international experience are stressed. (author)

  17. Preparations for the shipment of RA-3 reactor irradiated fuel

    International Nuclear Information System (INIS)

    Goldschmidt, Adrian; Novara, Oscar; Lafuente, Jose

    2002-01-01

    During the last quarter of 2000, in the Radioactive Waste Management Area of the Argentine National Commission of Atomic Energy (CNEA), located at Ezeiza Atomic Center (CAE), activities associated to the shipment of 207 MTR spent fuels containing high enrichment uranium were carried out within the Foreign Research Reactor/Domestic Research Reactor Receipt Program launched by the US Department of Energy (DOE). The MTR spent fuel shipped to Savannah River Site (SRS) was fabricated in Argentina with 90% enriched uranium of US origin and it was utilized in the operation of the research and radioisotope production reactor RA-3 from 1968 until 1987. After a cooling period at the reactor, the spent fuel was transferred to the Central Storage Facility (CSF) located in the waste management area of CAE for interim storage. The spent fuel (SF) inventory consisted of 166 standard assemblies (SA) and 41 control assemblies (CA). Basically, the activities performed were the fuel conditioning operations inside the storage facility (remote transference of the assemblies to the operation pool, fuel cropping, fuel re-identification, loading in transport baskets, etc.) conducted by CNEA. The loading of the filled baskets in the transport casks (NAC-LWT) by means of intermediate transfer systems and loaded casks final preparations were conducted by NAC personnel (DOE's contractor) with the support of CNEA personnel. (author)

  18. RA Research reactor, Annual report 1972

    International Nuclear Information System (INIS)

    Milosevic, D. et al.

    1972-12-01

    During 1972, the total production was 31151 MWh which is 3.8% higher than planned. The reactor was used for irradiation and experiments according to the demand of 381 users, of which 340 from the Institute and 41 external users. This report contains detailed data about reactor power and experiments performed in 1972. Discrepancies from the action plan, meaning higher production was achieved due to special demands of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to announced power cuts. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. There were no longer interruptions. One shorter interruption (shorter than 24 hours) caused by removal of a UO 2 capsule from the core, placed there for measuring heat transfer. Total personnel exposure dose was lower than during previous years. One accident caused contamination with gases and aerosols containing mainly shot-living isotopes. Decontamination od surfaces was less than during previous years. Practically there was no surface contamination that would demand action of the decontamination team, except for the regular decontamination after refueling. It was concluded that the successful operation in 1972 has a special significance having taking in account the financial crisis caused by the unresolved status of the reactor. It is emphasised, in the plan for the next year that there is an urgent need of making a long-term plan of rector application. It is indispensable to finish preparatory tasks for replacing the fuel with the highly enriched fuel elements by 1974, and building the core emergency cooling system [sr

  19. Communications programme for the RA nuclear reactor decommission

    International Nuclear Information System (INIS)

    Milanovic, S.; Antic, D.

    2002-01-01

    During the decommissioning of the RA research nuclear reactor at the VINCA Institute of Nuclear Sciences, an adequate number of radiation and contamination surveys should be conduced to assure radiological safety of the workers, the public and the environment. Public would like to know more about the nuclear and radiological safety. The communications programme defines the ways to informing the public, its representatives and the information media about the health and safety aspects of the activities during the RA nuclear reactor decommission. (author)

  20. CAC-RA1 1958-1998. The first years of the Constituyentes Atomic Center (CAC). History of the first Argentine nuclear reactor (RA-1); CAC-RA-1 1958-1998. Los primeros anios del CAC. Historia del primer reactor nuclear argentino (RA-1)

    Energy Technology Data Exchange (ETDEWEB)

    Forlerer, Elena; Palacios, Tulio A [comps.

    1998-07-01

    After giving the milestones of the development of the Constituyentes Atomic Center since 1957, the history of the construction of the first nuclear reactor (RA-1) in Argentina, including the local fabrication of its fuel elements, is surveyed. The RA-1 reached criticality on January 17, 1958. The booklet commemorates the 40th year of the reactor operation.

  1. Actions needed for RA reactor exploitation - I-IV, Part I, Thermotechnical experiments related to RA reactor hot start-up; Radovi za potrebe eksploatacije reaktora RA - I-IV, I Deo, Termotehnicki eksperimenti u vezi pustanja rektora RA na snagu

    Energy Technology Data Exchange (ETDEWEB)

    Novakovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Heavy water coolant loop of the RA reactor includes the reactor, circulation pumps, heat exchangers and pipes. The objective of this task was measuring the thermal parameters of the RA reactor during operation. This report contains the results of the experiment, calculations of thermal regime for the outer and inner tubes, maximum temperature of the fuel element, fluid flow rate in the reactor channels, temperature of the coolant and fuel element cladding.

  2. Nuclear Reactor RA Safety Report, Vol. 8, Auxiliary system

    International Nuclear Information System (INIS)

    1986-11-01

    This volume describes RA reactor auxiliary systems, as follows: special ventilation system, special drainage system, hot cells, systems for internal transport. Ventilation system is considered as part of the reactor safety and protection system. Its role is eliminate possible radioactive particles dispersion in the environment. Special drainage system includes pipes and reservoirs with the safety role, meaning absorption or storage of possible radioactive waste water from the reactor building. Hot cells existing in the RA reactor building are designed for production of sealed radioactive sources, including packaging and transport [sr

  3. Removal of spent fuel from the TVR reactor for reprocessing and proposals for the RA reactor spent fuel handling

    International Nuclear Information System (INIS)

    Volkov, E.B.; Konev, V.N.; Shvedov, O.V.; Bulkin, S.Yu; Sokolov, A.V.

    2002-01-01

    The 2,5 MW heavy-water moderated and cooled research reactor TVR was located at the Moscow Institute for Theoretical and Experimental Physics site. In 1990 the final batch of spent nuclear fuel (SNF) from the TVR reactor was transported for reprocessing to Production Association (PA) 'Mayak'. This transportation of the SNF was a part of TVR reactor decommissioning. The special technology and equipment was developed in order to fulfill the preparation of TVR SNF for transportation. The design of the TVR reactor and the fuel elements used are similar to the design and fuel elements of the RA reactor. Two different ways of RA spent fuel elements for transportation to reprocessing plant are considered: in aluminum barrels, and in additional cans. The experience and equipment used for the preparing TVR fuel elements for transportation can help the staff of RA reactor to find the optimal way for these technical operations. (author)

  4. Report on the activity of the RA reactor operation for the period from July 1 1961 - Sept. 30 1961; Tromesecni izvestaj za period od 1.VII do 30.IX 1961. g

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V [Laboratorija za eksploataciju reaktora RA, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-09-15

    During the reporting period the reactor was permanently ready for operation and responding to the demands of the experimenters. The reactor was operating for 408.5 hours at power levels from 50 - 5000 kW, or 1985 MWh in total, burnup of the first batch of fuel was 22.55%. Reactor core was made of 56 fuel channels. Activities related to construction of new and improvement of the existing equipment was continued in order to enable safe operation and successful utilization of the RA reactor. Exchange of the electronic tubes was continued in order to increase the stability of the reactor control and reactor protection systems. About 65% of tubes planned to be exchanged this year was done. Cooperation with the CEN Saclay, France related to construction of experimental loops VISA-1 and VISA-2 was continued as well as cooperation with Poland concerned with exchange of experts. The problem of lack of properly trained staff was nor solved. [Serbo-Croat] U izvestajnom periodu reaktor je uvek bio spreman za rad i odgovarao je zahtevima eksperimentatora. Reaktor je radio 408,5 casova na snagama od 50-5000 kW, odnosno ukupno 1985 MWh, pri cemu je ukupan utrosak prve sarze goriva bio 22,55%. Jezgro reaktora bilo je sacinjeno od 56 tehnoloskih kanala. Radi bezbednijeg pogona i sto uspesnije eksploatacije reaktora RA nastavljeno je sa radovima na realizaciji novih i poboljsanju postojecih uredjaja. U cilju povecanja stabilnosti elektronskih instrumenta u sistemu upravljanja i zastiti reaktora nastavljeno je sa zamenom elektronskih cevi, do sada je zamenjeno oko 65% radova predvidjenih za ovu godinu. Nastavljena je saradnja sa nuklearnim centrom u Saclay, Francuska na izradi petlje VISA-1 i VISA-2 i saradnja sa Poljskom u razmeni strucnjaka. Problem nedostatka kadrova nije resen.

  5. Research nuclear reactor RA - Annual Report 1995, with comparative review for period 1991-1995

    International Nuclear Information System (INIS)

    Sotic, O.

    1995-12-01

    Activities related to revitalisation of the RA reactor started in 1986, were continued during period 1991-1995. All the planned actions related to renewal of the reactor components were finished. The last, and at the same time most important action, related to exchange of complete reactor instrumentation is underway, delayed. The delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. The existing RA reactor instrumentation was dismantled. Control and maintenance of the reactor components was done regularly and efficiently. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 47 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. The problem of financing the reactor activities and maintenance remains unsolved during the period 1991-1995. This research reactor RA Annual is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection [sr

  6. The RA nuclear research reactor at VINCA Institute as an engineering and scientific challenge

    International Nuclear Information System (INIS)

    Mesarovic, M.

    1997-01-01

    The RA nuclear research at the Vinca Institute of Nuclear Sciences is the largest nuclear research facility in Yugoslavia and belongs to that generation of research reactors which have had an important contribution to nuclear technology development. As these older reactors were generally not built to specific nuclear standards, new safety systems had to be installed at the RA reactor for a renewal of its operating licence in 1984 and it was shut down, after 25 years of operation. Although all the required and several additional systems were built for the restart of the RA reactor, a disruption of foreign delivery of new control equipment caused its conversion to a 'dormant' facility, and it is still out of operation. Therefore, the future status of the RA reactor presents an engineering and scientific challenge to the engineers and scientists from Yugoslavia and other countries that may be interested to participate. To attract their attention on the subject, principal features of the RA reactor and its present status are described in detail, based on a recent engineering economic and safety evaluation. A comparative review of the world research reactors is also presented.(author)

  7. Causes of extended shutdown state of 'RA' research reactor in Vinca Institute

    International Nuclear Information System (INIS)

    Pesic, M.; Kolundzija, V.; Ljubenov, V.; Cupac, S.

    2001-01-01

    This paper describes the causes and reasons for extended shutdown state of RA research reactor in the 'Vinca' Institute of Nuclear Sciences. Technical and legal matters that led to decision to stop RA reactor operation in 1984 and further problems related to maintenance and preparation for continuation of operation are given. Influence of nuclear policy of Yugoslav government and the 'Vinca' Institute at prolongation of the reactor shutdown state, as consequence of changing of nuclear programme in the country and the world are discussed and underlined. An overview of the legislation in the field of nuclear safety and regulatory control of radiation sources and radioactive materials in Yugoslavia is presented. (author)

  8. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1992-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. For continuous training of the existing operator staff the Service has prepared and published eleven booklets: Nuclear reactor; RA reactor primary coolant loop; System for purification of heavy water; reactor helium system; system for technical water; electric power system; control and operation; ventilation system in the reactor building; special sewage system; construction properties of the reactor core; reactor building and installations. During the reporting period there have been no accidents nor incidents that could affect the reactor personnel [sr

  9. Nuclear Reactor RA Safety Report, Vol. 1, Introduction; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 1, Uvod

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    Based on the agreement between governments of Socialist Federal Republic of Yugoslavia and USSR of January 28 1956, a contract was signed about construction of RA research reactor in the Boris Kidric Institute of nuclear sciences. Building of the RA reactor started in 1956, and has reached criticality in 1959. Since then it has been in almost permanent operation, except for five longer shutdown periods: in 1963 because of heavy water and primary coolant system contamination with cobalt; in 1970 because of transporting the heavy water to France for isotopic regeneration; in 1979/1980 and 1983 because of aluminium oxyhydrate deposition on the fuel element cladding in reactor active region; in 1985/1986 because of ventilation system reconstruction and construction of emergency core cooling system. RA reactor is a heavy water cooled and heavy water moderated research reactor. Since the beginning of its operation, 2% enriched metal uranium fuel was used. From 1976, 80% enriched uranium oxide fuel elements were used partially in some core regions and since 1981 the complete core was filled with this highly enriched fuel. RA reactor was designed to operate under normal conditions at 6.5 MW power and at 10 MW power under forced regime. As a powerful neutron source the reactor was meant to be used for research in the field of reactor and neutron physics, solid state physics, radiation chemistry, biology and radioactive isotopes production. RA reactor was build by Yugoslav companies based on USSR basic design project. Main components of the systems were produced in USSR. [Serbo-Croat] Na osnovu Sporazuma izmedju vlada SFRJ i SSSR od 28. januara 1956. godine, sklopljen je ugovor o izgradnji istrazivackog reaktora RA u Institutu za nuklearne nauke Boris Kidric u Vinci. Reaktor RA je poceo da se gradi 1956. godine, a kriticnost je postigao 1959. godine. Od tada je takoreci neprekidno bio u radu, izuzev u pet slucajeva duzeg stajanja: 1963. godine - zbog kontaminacije teske vode

  10. Description of the control and safety systems of the RA reactor; Opis sistema za upravljanje i sigurnosnu zastitu RA

    Energy Technology Data Exchange (ETDEWEB)

    Popovic, B; Pesic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Yugoslavia)

    1962-07-01

    This report contains detailed description and scheme of the control and safety system of the RA reactor. It consists of interconnected five systems: for automated regulation; compensation rods; safety rods; power density measurement device; period meter; automated D{sub 2}O level meter in the core. Automated regulation system is divided into two parts: basic system for reactor operation regime at power from 10kW - 10 MW and precise regulation system for operation at set-up power level up to 10 kW which is used occasionally.

  11. Program of RA reactor start-up to nominal power

    International Nuclear Information System (INIS)

    1959-01-01

    The zero start-up program is followed by the program of RA reactor start-up to nominal power. This program is described in detail and includes the following measurements: radiation characteristics at the exit of the channels; gamma and fast neutron dose distribution in the reactor; influence of absorbers on the reactivity; temperature effect; absolute flux and calibration of ionization chambers; xenon effect; thermal and hydraulics; dosimetry around the reactor; neutron flux in the reactor core and in the reactor hall; heavy water level; thermal characteristics after shutdown. A list of measuring devices and instrumentation is included with the detailed action plan and list of responsible staff members

  12. Detection of fission products release in the research reactor 'RA' spent fuel storage pool

    International Nuclear Information System (INIS)

    Matausek, M.V.; Vukadin, Z.; Pavlovic, S.; Maksin, T.; Idakovic, Z.; Marinkovic, N.

    1997-05-01

    Spent fuel resulting from 25 years of operating the 6.5/10 MW thermal heavy water moderated and cooled research reactor RA at the VINCA Institute is presently all stored in the temporary spent fuel storage pool in the basement of the reactor building. In 1984, the reactor was shut down for refurbishment, which for a number of reasons has not yet been completed. Recent investigations show that independent of the future status of the research reactor, safe disposal of the so far irradiated fuel must be the subject of primary concern. The present status of the research reactor RA spent fuel storage pool at the VINCA Institute presents a serious safety problem. Action is therefore initiated in two directions. First, safety of the existing spent fuel storage should be improved. Second, transferring spent fuel into another, presumably dry storage space should be considered. By storing the previously irradiated fuel of the research reactor RA in a newly built storage space, sufficient free space will be provided in the existing spent fuel storage pool for the newly irradiated fuel when the reactor starts operation again. In the case that it would be decided to decommission the research reactor RA, the newly built storage space would provide safe disposal for the fuel irradiated so far

  13. RA reactor Action plan for 1978 - Annex VI; Prilog VI - Plan rada reaktora RA za 1978. godinu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-12-15

    This annex include a detailed monthly action plan of the RA reactor for 1978. It was planned that the reactor will operate at nominal and lower power levels for 158 days. The plan is made with the aim to achieve same annual neutron flux as in 1977, which is somewhat higher then the annual production in the period from 1968-1975. [Serbo-Croat] Ovaj prilog sadrzi detaljan plan rada reaktora RA za 1978. godinu. Planirano je da reaktor radi na nominalnoj snazi of 6,5 MW i na manjim snagama ukupno 158 dana. Plan je napravljen tako da se ostvari godisnja proizvodnja neutronskog fluksa u obimu koji je relaizovan 1977. godine sto je nesto vise od godisnje proizvodnje u periodu 1968-1975.

  14. Measurement of neutrons in the RA reactor cell; Merenje neutrona u elementarnoj celiji reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Bosevski, T [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    A special experimental device was constructed for measuring the neutron flux distribution in the RA reactor cell. This device simulated the reactor cell in order to avoid disturbance in the reactor core. It was made of an aluminium cylindrical vessel having outer diameter same as the vertical experimental channel and contained three fuel slugs. Hole was made in through the center of the fuel slugs and a copper wire was placed in the hole for measuring the thermal neutron flux distribution. It was placed in the experimental channel VK-5 in the location of highest neutron flux. Handling of samples for irradiation was quite simple.

  15. RA Reactor operation and maintenance (I-IX), part V, Task 3.08/04-06, Refurbishment of the heavy water pumps; Pogon i odrzavanje reaktora RA (I-IX), V Deo, Zadatak 3.08/04-06 Remont teskovodnih pumpi

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V; Nikolic, M; Milic, J [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    In addition to detailed instructions for maintenance and repair of the heavy water pumps at the RA reactor this document includes nine annexes. They are as follows: cleaning the heavy water pump Avala with distilled water; instructions for repair of the pump CEN-132 (two annexes); list of operating characteristics of the pumps before repair; conclusions of the experts concerning the worn out bearings of the heavy water pump Avala, with the analysis of the stellite layer; report on the completed repair actions on the pumps Avala and CEN-132; report on the measurements done on the pump Avala; and the certificate concerning inspection of the pump.

  16. Dosimetry and radiation shielding at the RA reactor, Annual report 1975, Annex 5

    International Nuclear Information System (INIS)

    Ninkovic, M.

    1976-01-01

    In the working environment at the RA reactor, the level of gamma radiation is measured continuously by the built-in stationary system. According to the needs, measurement are done in the reactor hall every day. The level of gamma radiation is measured separately in typical points when the reactor is operated at nominal power and during intervals between two operating campaigns. The level of neutron radiation is measured according to the needs by means of a mobile spherical neutron detector. These measurements are done in the reactor hall around the horizontal experimental channels. Measured values of neutron radiation are three times lower than the relevant levels of gamma radiation [sr

  17. Instructions for RA reactor decontamination - Annex 10; Prilog 10 - Uputstvo za dekontaminaciju Reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1963-12-15

    Instructions for RA reactor decontamination includes: action plan for decontamination of the heavy water system by 7% water solution of H{sub 3}PO{sub 4} + 2% CrO{sub 3} acid; description of the preparatory work including calculation of the pipes volume and installation of special pipes; detailed instructions for decontamination procedure. [Serbo-Croat] Uputstvo za dekontaminaciju Reaktora RA sadrzi: plan operacija za dekontaminaciju sistema teske vode 7% vodenim rastvorom kiseline H{sub 3}PO{sub 4} + 2% CrO{sub 3}; opis pripremnih radova ukljucujuci proracun zapremine covovoda i montiranje posebnih cevovoda; detaljno uputstvo za izvodjenje operacija pri dekontaminaciji.

  18. Future prospects of reactor Ra at VINCA institute

    International Nuclear Information System (INIS)

    Davidovic, M.; Babic-Stojic, B.; Dobrijevic, R.

    1997-01-01

    Reactor RA at Nuclear Research Institute Vinca belongs to a group of the medium thermal neutron flux reactors, according to classification at end of nineties. At the beginning reactor RA has been used as a powerful source of neutrons and gamma-quanta for various experiments (interaction of neutrons and gamma-quanta with materials) and for production of artificial radioactive materials for commercial use. Very successful utilization of this neutron spectrum has been in its use for structural studies of crystal materials and liquid metals, for magnetic structure studies of various magnetic materials, as well as, dynamic properties of ferro magnetics, ferroelectrics, etc. This kind of spectrometers still exist at reactor RA and with an improved detection system could be used again if reactor starts functioning. Besides this, a part of activity was devoted to construction of neutron guide tubes for thermal neutrons and this could also be accomplished relatively easy in the future. A part of the activities of the reactor should in the future be devoted to the training of students in the field of solid state physics and nuclear physics. Particular attention will be paid to the use of established technologies in production of radioactive isotopes and a new class of isotopes for custom use will be developed as well as highly commercial and prospective products (silicon doping, radiography, etc.). (author)

  19. Wireless condition monitoring for the RA-6 research reactor

    International Nuclear Information System (INIS)

    Garcia Peyrano, O.; Calzeta, O.; Rico, N.; Damiani, H.; Coutsiers, E.

    1999-01-01

    The vibration laboratory at C.A.B. has a great experience with the analysis and diagnostic of symptoms of failures in the rotating equipment of the R-6 research reactor and in our longest NPP (CANDU 600 Mw), located in Embalse town, Cordoba City, Argentina. Objective: The standard condition monitoring instrumentation system were designed for large equipment operating under different environmental conditions and sensitivities. The signal processing is not flexible and the diagnostic is an expensive method for the small poll type research reactors. This papers describes the research and development which are related whit the new concept, cheaper and flexible condition monitoring instrumentation system. Implementing a vibration analysis measurements technique with a sensor inside (in the pool) of the nuclear reactor RA-6, and mainly based on fft signal processing, an extensive program for vibration source identification was done. Different nuclear power conditions were monitored as full power and in zero power, also. This zero power shows the best acoustical environmental, because the cooling pumps are stop, and the core is cooling by natural convection. Two sensors were mainly used as the detector's subsystem. One of these detectors was an accelerometer attached to the top of the fine control rod and the other one was a water resistant omnidirectional microphone which was located underwater at different distances from the nuclear core. All the signal measurement by this two sensors were recorded and then was processed. Both signal was acquired at the same time for correlation analysis purposes. The analysis was composed by a 'Spectral Dynamics SD380' connected to a P.C. with dedicated post processing software. On the other hand, some calibration and sensitivity comparison was done using an SKFCM40, dual channel data collector and analyzer. (author)

  20. Nuclear Reactor RA Safety Report, Vol. 9, Radiation protection

    International Nuclear Information System (INIS)

    1986-11-01

    Instrumentation for Radiation protection existing at the RA reactor is dating mostly from the period 1957-1959 when the reactor has been built. With some minor exception it was produced in USSR. Radiation protection system was constructed based on specific design project, somewhat modified original USSR project which has been indispensable because of some modification of the building design. During the past 27 years no renewal of the instrumentation was done, only maintenance was performed. Instrumentation consists of old electronic devices which caused difficulties and even prevented regular maintenance because of lack of spare parts. Instrumentation for radiation protection at the RA reactor is classified as follows: centralized dosimetry system; stationary dosimetry instrumentation, movable and personal dosimetry systems. Apart from the scheme of dosimetry instrumentation this volume includes description of radiation protection procedures; protection devices; radiation doses and dose limit data; program for environmental radioactivity control; medical control procedures [sr

  1. Nuclear Reactor RA Safety Report, Vol. 14, Safety protection measures; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 14, Sigurnosne zastitne mere

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    Nuclear reactor accidents can be caused by three type of errors: failure of reactor components including (1) control and measuring instrumentation, (2) errors in operation procedure, (3) natural disasters. Safety during reactor operation are secured during its design and construction and later during operation. Both construction and administrative procedures are applied to attain safe operation. Technical safety features include fission product barriers, fuel elements cladding, primary reactor components (reactor vessel, primary cooling pipes, heat exchanger in the pump), reactor building. Safety system is the system for safe reactor shutdown and auxiliary safety system. RA reactor operating regulations and instructions are administrative acts applied to avoid possible human error caused accidents. [Serbo-Croat] Uzroci udesa na nuklearnim reaktorima mogu se svrstati u jednu od sledece tri grupe: (1) otkaz pojedinih delova opreme, ukljucujuci mernu i kontrolnu instrumentaciju, (2) greske u pogonu i eksploataciji, (3) prirodne nepogode, katastrofe. Bezbednost i sigurnost u radu nuklearnog reaktora osiguravaju se odredjenim merama koje se preduzimaju pri njegovoj izgradnji i kasnije njegovoj elsploataciji. Te mere se mogu podeliti u sledece dve kategorije: (1) mere tehnicke zastite, i (2) administrativne mere. Mere tehnicke zastite sastoje se od barijere fissionih produkata, kosuljice gorivnih elemenata, primarnog kola reaktora RA (reaktorski sud, cevovod primarnog kola, toploizmenjivac u pimpi), zgrada reaktora. Sigurnosni sistem cini sistem za sigurnosno zaustavljanje reaktora i pomocni sigurnosni sistem. Kroz odgovarajuce propise i uputstva za rad na reaktoru RA primenjene su administrativne mere neophodne za sprecavanje udes koji bi mogao nastati kao posledica ljudskog faktora.

  2. Service for maintenance of electronic equipment of the RA reactor, Report for 1977 - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1977-01-01

    This report describes the tasks and organizational structure of the Service for maintenance of electronic equipment of the RA reactor. The most important task of this Service is control and maintenance of the reactor control and protection instruments, operation control, and dosimetry system. Besides data about this basic instrumentation, the report includes data about control and maintenance of other electronic equipment related to the experimental devices [sr

  3. Possibilities for power reactor structural material and fuel testing in reactor RA; Mogucnosti reaktora RA za testiranje konstrukcionih materijala i goriva energetskih reaktora

    Energy Technology Data Exchange (ETDEWEB)

    Martinc, R; Lazarevic, Dj; Stefanovic, D; Cupac, S; Pesic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1978-05-15

    Nuclear reactor RA at Vinca has been designed as a high flux general purpose research reactor. Among other it was intended to play a role of material testing reactor. A scope of activities of Material Laboratory and Reactor RA Department of Boris Kidric Institute is presented in this report. Reactor RA capacity for reactor structural material and fuel irradiation is also described. The increase of RA reactor irradiation capacity is based on the improvement of VISA type fuel channel for fast neutron irradiations, as well as on the general neutron flux increase, due to introduction of highly enriched uranium fuel into reactor core and the advanced in-core fuel management. The irradiation capacities described allow for the reactor material and fuel testing to the considerable extent. Istrazivacki reaktor RA u Vinci je projektovan kao visokofluksni istrazivacki reaktor opste namene. Pored ostalog, on je namenjen i za testiranje reaktorskih konstrukcionih materijala i goriva. U radu je dat pregled aktivnosti Laboratorije za materijale IBK i reaktora RA na tom podrucju, kao i opis povecanih mogucnosti reaktora RA za ozracivanje reaktorskih materijala i goriva u cilju njihovog testiranja. Povecanje mogucnosti reaktora RA zasniva se na usavrsavanju specijalnog gorivnog kanala tipa VISA (za ozracivanje materijala brzim neutronima), kao i na opstem povecanju neutronskog fluksa na osnovu uvodjenja i nacina koriscenja visokoobogacenog uranskog goriva u reaktoru RA. Opisane mogucnosti reaktora RA dozvoljavaju u znatnoj meri ispitivanje konstrukcionih materijala i goriva energetskih reaktora.

  4. Calculation of neutron spectra in the reactor cell of the RA experimental reactor in Vinca

    International Nuclear Information System (INIS)

    Bosevski, T.; Altiparmakov, D.; Marinkovic, N.

    1974-01-01

    In the frame of neutron properties of RA experimental reactor the study of energy neutron spectra in the reactor cell are planned. Complex reactor cell geometry, nine cylindrical regions causes high space-energy variations of neutron flux with a significant gradient both in energy and space variables. Treatment of such a complex problem needs adequate methodology which ensures reliable results and control of accuracy. This paper describes in detail the method for calculating group constants based on lattice cell calculation for the need of calculation of reactor core parameters. In 26 group approximation for the energy region from 0 - 10.5 MeV, values of neutron spectra are obtained in 18 space points chosen to describe, with high accuracy, integral reactor cell parameters of primary importance for the reactor core calculation. Obtained space-energy distribution of neutron flux in the reactor cell is up to now unique in the study of neutron properties of Ra reactor [sr

  5. Use of plate fuel elements for the RA3 reactor

    International Nuclear Information System (INIS)

    Parodi, C.; Parkanski, D.; Higa, M.; Marajofsky, A.

    1992-01-01

    The RA3 reactor is a pool reactor, redesigned for 5 MW dissipation. Nineteen plates are used in each fuel element. The utilization of 20% enriched U, gives the possibility of the development of rod type fuel with Al/U 3 O 8 cermets. The thermohydraulic and neutronic conditions are studied in this work in order to satisfy the stipulated power. In addition, the fabrication conditions of Al/U 3 O 8 and Al/U 3 O 8 /Zr H 2 cermets with densities within the limits imposed by the thermohydraulics and neutronics conditions are studied. (author)

  6. Regulations for the maintenance division of the RA reactor, Annex 6; Prilog 6 - Pravilnik poslovanja Odelenja odrzavanja i remonta reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Badrljica, R [Reaktor RA, Odelenje odrzavanja, Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1965-12-15

    The regulations for the Division of reactor maintenance include the organizational scheme, tasks of the Division, and operation procedures for all the staff members. [Serbo-Croat] Pravilnik o radu Odelenja za odrzavanje reaktora RA sadrzi opis organizacione strukture sluzbe, zadataka Odelenja, organizacije rada, nacin poslovanja za sve saradnike Odelenja.

  7. Tasks related to increase of RA reactor exploitation and experimental potential, 03. Crane for handling the vertical experimental channels of the RA reactor - design project

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1963-07-01

    Within the work related to improvement of experimental potential of the RA reactor, this document describes the design project of the new crane for handling the vertical experimental channels of the RA reactor, engineering drawings of the crane main elements, mechanical part, design project of the electrical part of the crane and cost estimation

  8. Biological dosimetry studies for boron neutron capture therapy at the RA-1 research reactor facility

    International Nuclear Information System (INIS)

    Trivillin, Veronica A.; Heber, Elisa M.; Itoiz, Maria E.; Schwint, Amanda E.; Castillo, Jorge

    2004-01-01

    Initial physical dosimetry measurements have been completed using activation spectrometry and thermoluminescent dosimeters to characterize the BNCT facility developed at the RA-1 research reactor operated by the National Atomic Energy Commission in Buenos Aires. Biological dosimetry was performed employing the hamster cheek pouch oral cancer model previously validated for BNCT studies by our group. Results indicate that the RA-1 neutron source produces useful dose rates for BNCT studies but that some improvements in the initial configuration will be needed to optimize the spectrum for thermal-neutron BNCT research applications. (author)

  9. RA reactor reactivity changes before refurbishment - Task 3.08/02; Zadatak 3.08/02 - Promene reaktivnosti reaktora RA do remonta

    Energy Technology Data Exchange (ETDEWEB)

    Dobrosavljevic, N; Strugar, P; Stamenkovic, S [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    From the the end of 1959, when the RA reactor started operation until January 1963 reactor was operated with the initial fuel batch of 56 fuel channels. After 310 MWd 68 fuel channels were added to the reactor core, and after further 357 MWd the core was filled up to the maximum of 88 fuel channels. Basic reactor parameters were systematically measured during two years of operation. This report covers the measurements concerned directly with the reactor operation: calibration of the control rods and their reactivity worths during operation, determining the total built-in reactivity excess and its change during burnup, determination of reactivity dependence on the temperature, xenon effect in the core.

  10. Ventilation system in the RA reactor building - design specifications

    International Nuclear Information System (INIS)

    Badrljica, R.

    1984-09-01

    Protective role of the ventilation system of nuclear facilities involve construction of ventilation barriers which prevent release of radioactive particulates or gases, elimination od radioactive particulates and gases from the air which is released from contaminated zones into the reactor environment. Ventilation barriers are created by dividing the building into a number of ventilation zones with different sub pressure compared to the atmospheric pressure. The RA reactor building is divided into four ventilation zones. First zone is the zone of highest risk. It includes reactor core with horizontal experimental channels, underground rooms of the primary coolant system (D 2 O), helium system, hot cells and the space above the the reactor core. Second zone is the reactor hall and the room for irradiated fuel storage. The third zone includes corridors in the basement, ground floor and first floor where the probability of contamination is small. The fourth zone includes the annex where the contamination risk is low. There is no have natural air circulation in the reactor building. Ventilators for air input and outlet maintain the sub pressure in the building (pressure lower than the atmospheric pressure). This prevents release of radioactivity into the atmosphere [sr

  11. Power reactors operational diagnosis

    International Nuclear Information System (INIS)

    Dach, K.; Pecinka, L.

    1976-01-01

    The definition of reactor operational diagnostics is presented and the fundamental trends of research are determined. The possible sources of power reactor malfunctions, the methods of defect detection, the data evaluation and the analysis of the results are discussed in detail. In view of scarcity of a theoretical basis and of insufficient in-core instrumentation, operational diagnostics cannot be as yet incorporated in a computer-aided reactor control system. (author)

  12. Description of the control and safety systems of the RA reactor

    International Nuclear Information System (INIS)

    Popovic, B.; Pesic, M.

    1962-01-01

    This report contains detailed description and scheme of the control and safety system of the RA reactor. It consists of interconnected five systems: for automated regulation; compensation rods; safety rods; power density measurement device; period meter; automated D 2 O level meter in the core. Automated regulation system is divided into two parts: basic system for reactor operation regime at power from 10kW - 10 MW and precise regulation system for operation at set-up power level up to 10 kW which is used occasionally

  13. Ventilation system in the RA reactor building - design specifications; Sistem ventilacije u objektu 'RA' - Tehnicki opis

    Energy Technology Data Exchange (ETDEWEB)

    Badrljica, R [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1984-09-15

    Protective role of the ventilation system of nuclear facilities involve construction of ventilation barriers which prevent release of radioactive particulates or gases, elimination od radioactive particulates and gases from the air which is released from contaminated zones into the reactor environment. Ventilation barriers are created by dividing the building into a number of ventilation zones with different sub pressure compared to the atmospheric pressure. The RA reactor building is divided into four ventilation zones. First zone is the zone of highest risk. It includes reactor core with horizontal experimental channels, underground rooms of the primary coolant system (D{sub 2}O), helium system, hot cells and the space above the the reactor core. Second zone is the reactor hall and the room for irradiated fuel storage. The third zone includes corridors in the basement, ground floor and first floor where the probability of contamination is small. The fourth zone includes the annex where the contamination risk is low. There is no have natural air circulation in the reactor building. Ventilators for air input and outlet maintain the sub pressure in the building (pressure lower than the atmospheric pressure). This prevents release of radioactivity into the atmosphere. Zastitne uloge ventilacionog sistema kod nuklearnih postrojenja obuhvataju formiranje ventilacionih barijera koje onemugucavaju sirenje radioaktivnih cestica ili gasova putem cirkulacije vazduha; eliminaciju radioaktivnih cestica i gasova iz vazduha koji se evakuise iz kontaminiranih prostora u okolinu reaktorskog postrojenja. Formiranje zastitnih ventilacionih barijera ostvaruje se obicno podelom unutrasnjosti objekta na vise ventilacionih zona razlicitih podpritisaka u odnosu na spoljni atmosferski pritisak. Celi prostor zgrade reaktora RA podeljen je u cetiri ventilacione zone. Prva zona je zona najveceg rizika, u koju spadaju reaktorsko jezgro sa horizontalnim eksperimentalnim kanalima, tehnoloske

  14. Conclusions of the experts group of the RA reactor at the meeting held on November 2 and 3 1964 - Annex 12a

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1964-01-01

    Conclusions of the experts group of the RA reactor are related to: analyses of reactor operation at 6.5 MW power with heavy water coolant flow of 250 m 3 /h (2 pumps rotation speed 1500 rotations/min); decisions of future operation; further preparation activities related to reactor operation in forced regime and reduced cooling conditions

  15. RA Research reactor, Annual report 1971; Istrazivacki nuklearni reaktor RA - Izvestaj za 1971. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1971-12-15

    During 1971, the RA Reactor was operated at nominal power of 6.5 MW for 190 days, and 50 days at lower power levels. Total production mounted to 31606 MWh which is 5.3% higher than planned, and the highest annual level since the reactor started operation. Reactor was used for irradiation and experiments according to the demand of 425 users, of which 370 from the Institute and 55 external users. This report contains detailed data about reactor power and experiments performed in 1971. Discrepancies from the action plan, meaning higher production was achieved in June and December due to special demand of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to power cuts during reactor operation. There was no longer interruption caused by failures of the equipment. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. Shorter interruptions resulted from breaking of connectors in the technical water pipe system caused by soil sliding near the pumping station on the Danube. Total personnel exposure dose was lower than during previous years. There was no accident nor any event that could be called accidental. Decontamination od surfaces was less than during previous years. It was concluded that the successful operation in 1971 resulted from efficient work during past years. But, some of the activities were interrupted due to undefined policy concerned with operation of the RA reactor and financial issues. This involves study of the possibility to use highly enriched fuel that would increase the useful neutron flux and the reactor compatibility with similar reactors for the future ten years. Another project that has been interrupted is construction of the emergency core cooling system which is important for the reactor safety. Financial problems have influenced not only the reactor operation but the number of employees, which could cause negative

  16. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-04-01

    The Operating Units Status Report --- Licensed Operating Reactors provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff on NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non- power reactors in the US

  17. Design and construction of demineralized water production and maintenance system for RA-O nuclear reactor

    International Nuclear Information System (INIS)

    Rumis, D.; Martin, H.R.

    1990-01-01

    The normal operation of zero power RA-O Nuclear Reactor requires a production and maintenance of demineralized water system. This system was designed and built-up during the works for actualization, upgrading and new start up at Cordoba National University of this facility. This paper comments the relevant aspects about the didactical purpose of that system and the details considered for training and practices with it. Similarly, considerations about solids wastes and effluents treatment are discussed. (Author)

  18. Nuclear reactors sources of contamination - RA reactor in Vinca as an example; Nuklearni reaktori kao izvori kontaminacije - Primer reaktora RA u Vinci -

    Energy Technology Data Exchange (ETDEWEB)

    Mitrovic, S; Djukic, Z; Dobrosavljevic, N [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1966-03-15

    This study contains an analysis of possible contamination caused by reactor accidents. In addition to description of maximum credible accident impacts on the environment it covers the prevention and procedures to be undertaken in case of accident. The RA reactor was taken as an example. Since the probability of maximum credible accident is very low minor accident that could cause fission products release were analyzed. Analysis of the spent fuel storage pool at the RA reactor is included as well.

  19. Pressurised water reactor operation

    International Nuclear Information System (INIS)

    Birnie, S.; Lamonby, J.K.

    1987-01-01

    The operation of a pressurized water reactor (PWR) is described with respect to the procedure for a unit start-up. The systems details and numerical data are for a four loop PWR station of the design proposed for Sizewell-'B', United Kingdom. A description is given of: the initial conditions, filling the reactor coolant system (RCS), heat-up and pressurisation of the RCS, secondary system preparations, reactor start-up, and reactivity control at power. (UK)

  20. An evaluation of the worker exposure during the RA reactor decommissioning due to presence of contamination

    International Nuclear Information System (INIS)

    Ljubenov, V.; Simovic, R.

    2005-01-01

    In this paper a possibility to establish the relationship between the presence of the surface contamination in the RA reactor rooms and the worker exposure during the decommissioning activities is discussed. RESRAD-BUILD code and the models typical for the RA reactor has been used to determine annual doses from the supposed activities of the main expected RA reactor contaminants. Different room air exchange rates have been modelled and analysed. (author) [sr

  1. Power measurement of the RA-3 reactor using the neutron noise technique and 16N

    International Nuclear Information System (INIS)

    Gomez, Angel

    2003-01-01

    This work describes a measurement method based on the neutron noise technique which is used for determining the relation between the power and the currents of two ionization chambers. These chambers are sensitive to the gamma radiation from the 16 N decay produced in the RA-3 reactor core. The power during operation is obtained from the calibration factors by measuring those currents. As this calibration factors depend on the cooler flow that circulates in the reactor core and in the 16 N measuring system, an estimator, that is a function of the ratio of this currents, is proposed in order to detect flow changes. (author)

  2. Research nuclear reactor RA - Annual Report 1990 with the comparative evaluation for the period 1986-1990; Istrazivacki nuklearni reaktor RA - Izvestaj za 1990. godinu uz uporedni pregled za period 1986 - 1990

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1990-12-15

    Annual report concerning the project 'RA research nuclear reactor' for 1990, financed by the Serbian ministry of science is divided into two parts. First part is concerned with RA reactor operation and maintenance, which is the task of the Division for reactor engineering of the Institute for multidisciplinary studies and RA reactor engineering. Second part deals with radiation protection activities at the RA reactor which is the responsibility of the Institute for radiation protection. Scientific council of the Institute for multidisciplinary studies and RA reactor engineering has stated that this report describes adequately the activity and tasks fulfilled at the RA reactor in 1989. The scope and the quality of the work done were considered successful both concerning the maintenance and reconstruction, as well as radiation protection activities. [Serbo-Croat] Godisnji izvestaj po projektu 'Istrazivacki nuklearni reaktor RA' za 1990. godinu, koji finansira republicka zajednica za nauku SR Srbije po ugovoru br. 3705/1 sastoji se iz dva dela. Prvi deo obuhvata pogon i odrzavanje nuklearnog reaktora RA, sto predstavlja obavezu Odeljenja za reaktorski inzenjering u sastavu OOUR Instituta za multidisciplinarna istrazivanja i inzenjering RA. Drugi deo obuhvata poslove zastite od zracenja na reaktoru RA, sto predstavlja obavezu OOUR Instituta za zastitu od zracenja 'Zastita'. Naucno vece Instituta za multidisciplinarna istrazivanja i inzenjjring RA ocenilo je da sadrzina ovog izvestaja odgovara izvrsenim poslovima na reaktoru RA u 1989. godini. Pozitivno se ocenjuje obim i kvalitet izvrsenih radova kako u pogledu odrzavanja i rekonstrukcije reaktora, tako i u pogledu poslova zastite od zracenja izvrsenih kod njega.

  3. RA Research reactor, Report for the period January-December 2002

    International Nuclear Information System (INIS)

    Pesic, M.; Sotic, O.; Nikolic, A.

    2003-01-01

    During 2002 activities at the RA research nuclear reactor were performed according to the action plan related to maintenance of this facility and Contract about financing the reactor for the period January-december 2002 signed in June 2002 with the Ministry of science, technologies and development of the Republic of Serbia. In July 2002. the the Government of Serbia has finally declared a decision about permanent shutdown of the RA reactor, initiation of reactor decommissioning process, and solving the problem of the spent fuel storage in the reactor building. These decisions demanded new organizational structure in the Institute for efficient completion of the mentioned programs. As previously, the main activities during the reporting period involved maintenance of the systems which must be operated permanently or occasionally and the systems and equipment of special importance for security of the facility. In addition to regular maintenance activities, a series of investment tasks were completed in the reactor building. Special activities were related to nuclear fuel inspection conducted by the IAEA. Significant cooperation with IAEA was achieved after September 2001, when Yugoslavia became again a member of the IAEA. During 2002 a number of significant activities were prepared and completed: transport of fresh highly enriched fuel to Russia; signing the contract with IAEA concerning work on future RA reactor decommissioning program; preliminary analysis and preparation for storage of spent nuclear fuel and future decommissioning. The contracts signed with the IAEA are in complete agreement with decisions of the Serbian government. It is indispensable to create a regulatory body on the government level which would provide needed conditions for completion of these complicated tasks and control performance. At this moment no such body exists and no financial support is provided although this is a condition for obtaining support from the IAEA or any other

  4. Program of RA reactor start-up to nominal power; Program dizanja reaktora 'RA' na nominalnu snagu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1959-07-01

    The zero start-up program is followed by the program of RA reactor start-up to nominal power. This program is desed in detail and includes the following measurements: radiation characteristics at the exit of the channels; gamma and fast neutron dose distribution in the reactor; influence of absorbers on the reactivity; temperature effect; absolute flux and calibration of ionization chambers; xenon effect; thermal and hydraulics; dosimetry around the reactor; neutron flux in the reactor core and in the reactor hall; heavy water level; thermal characteristics after shutdown. A list of measuring devices and instrumentation is included with the detailed action plan and list of responsible staff members.

  5. Decontamination of the RA reactor heavy water system, Annex 9

    International Nuclear Information System (INIS)

    Maksimovic, Z.B.; Nikolic, R.M.; Marinkovic, M.D.; Jelic, Lj.M.

    1963-01-01

    Both stainless steel and aluminium parts of the RA reactor heavy water system system were decontaminated as well as the heavy water itself. System was contaminated with 60 Co. Decontamination factor was determined by activity measurements during distillation. Concentration of the corrosion products in the heavy water was measured by spectrochemical analysis, and found to be 0.1 - 1 mg/l. Chemical analyses of the aluminium and stainless steel surfaces showed that cobalt was adsorbed on the aluminium oxide layer. Water solution of 7%H 3 PO 4 + 2% CrO 3 was used for decontamination of the heavy water system and distillation device. This was found to be the most efficient solvent which does not affect stainless steel corrosion. Decontamination factors achieved were from 60 - 100. Decontamination results enabled determining the distribution of cobalt in the system: 10 Ci on the stainless steel parts, 50 Ci in the heavy water; and above 600 Ci on the fuel and experimental channels. Specific activity of 60 Co was calculated to be 15 Ci/g on the reactor channels, 8 Ci/g on the stainless steel parts and 3 Ci/g in the heavy water. Decontamination of the aluminium parts was not done because it was considered it could initiate corrosion. Since the efficiency of distillation is increased it was expected that permanent distillation would remove most of the activity in the reactor channels

  6. Preparation of mandatory documentation before the start up of the RA-0 'zero power' nuclear reactor at Cordoba National University

    International Nuclear Information System (INIS)

    Martin, H.R.; Keil, W.M.; Pezzi, N.

    1991-01-01

    Before the start up of the RA-0 'zero power' nuclear reactor installed at Cordoba National University, it was necessary to send to the Regulatory Authority the mandatory documentation which is required in the licensing process. With the previous papers existing for the operation in the first years of the '70, a work program for the future operational training personnel was elaborated. Based on the Authority's applicable rules and the recommendations and with particular criteria originated in the working university conditions, the SAFETY report of RA-0 nuclear reactor was prepared. This paper describes the principal contents, items and documents involved in the safety report. (Author) [es

  7. Reactor helium system, design specification, operation and handling

    International Nuclear Information System (INIS)

    Badrljica, R.

    1984-06-01

    Apart from detailed design specification of the helium cover gas system of the Ra reactor, this document includes description of the operating regime, instructions for manipulations in the system with the aim of achieving and maintaining stationary gas circulation [sr

  8. Irradiation of an uranium silicide prototype in RA-3 reactor

    International Nuclear Information System (INIS)

    Calabrese, R.; Estrik, G.; Notari, C.

    1996-01-01

    The factibility of irradiation of an uranium silicide (U 3 Si 2 ) prototype in the RA-3 reactor was studied. The standard RA-3 fuel element uses U 3 O 8 as fissible material. The enrichment of both standard and prototype is the same: 20% U 235 and also the frame geometry and number of plates is identical. The differences are in the plate dimensions and the fissile content which is higher in the prototype. The cooling conditions of the core allow the insertion of the prototype in any core position, even near the water trap, if the overall power is kept below 5Mw. Nevertheless, the recommendation was to begin irradiation near the periphery and later on move the prototype towards more central positions in order to increase the burnup rate. The prototype was effectively introduced in a peripheral position and the thermal fluxes were measured between plates with the foil activation technique. These were also evaluated with the fuel management codes and a reasonable agreement was found. (author). 5 refs., 3 figs., 3 tabs

  9. Consolidation of the neutron spectrum in the RA-6 reactor

    International Nuclear Information System (INIS)

    Bazzana, S.; Chiaraviglio, N.

    2013-01-01

    Unfolding procedures can be used to determine the neutron or gamma spectrum in a multigroup structure from experimental and calculation results. In this way, it is possible to adjust with high reliability magnitudes that cannot be directly measured. For neutron unfolding it is necessary the use of a set of detectors with different energetic response. In this work we describe two unfolding experiences in different positions of the RA-6 reactor of the Bariloche Atomic Centre. One of them consisted in the unfolding in an incore position and the other one in the BNCT facility beam.Experimental techniques and neutron detectors for each experience are described along with the correction factors that must be taken into account for each experience. In both cases there is good agreement between measured and adjusted quantities. (author) [es

  10. Nuclear reactor physics course for reactor operators

    International Nuclear Information System (INIS)

    Baeten, P.

    2006-01-01

    The education and training of nuclear reactor operators is important to guarantee the safe operation of present and future nuclear reactors. Therefore, a course on basic 'Nuclear reactor physics' in the initial and continuous training of reactor operators has proven to be indispensable. In most countries, such training also results from the direct request from the safety authorities to assure the high level of competence of the staff in nuclear reactors. The aim of the basic course on 'Nuclear Reactor Physics for reactor operators' is to provide the reactor operators with a basic understanding of the main concepts relevant to nuclear reactors. Seen the education level of the participants, mathematical derivations are simplified and reduced to a minimum, but not completely eliminated

  11. Nuclear Reactor RA Safety Report, Vol. 8, Auxiliary system; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 8, Pomocni sistemi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    This volume describes RA reactor auxiliary systems, as follows: special ventilation system, special drainage system, hot cells, systems for internal transport. Ventilation system is considered as part of the reactor safety and protection system. Its role is eliminate possible radioactive particles dispersion in the environment. Special drainage system includes pipes and reservoirs with the safety role, meaning absorption or storage of possible radioactive waste water from the reactor building. Hot cells existing in the RA reactor building are designed for production of sealed radioactive sources, including packaging and transport. [Serbo-Croat] Ova knjiga obuhvata opis pomocnih sistem reaktora RA: sistem specijalne ventilacije, sistem specijalne kanalizacije, vruce komore, sistemi za unutrasnji transport. Ventilacioni sistem je znacajan deo sistema zastite i sigurnosti reaktora. Njegova je uloga da onemoguci disperziju radioaktivnih cestica u okolinu. Sistem specijalne kanalizacije sastoji se od agregata, cevovoda i rezervoara sa sigurnosnom armaturom i ima zadatak da prihvata i u sebe deponuje radioaktivne otpadne vode iz objekarta reaktora RA. U zgradi reaktora RA postoje vruce komore koje su namenjene za proizvodnju zatvorenih izvora zracenje, ukljucujuci i mehanicku obradu, prepakivanje i transport.

  12. Operating US power reactors

    International Nuclear Information System (INIS)

    Silver, E.G.

    1988-01-01

    This update, which appears regularly in each issue of Nuclear Safety, surveys the operations of those power reactors in the US which have been issued operating licenses. Table 1 shows the number of such reactors and their net capacities as of September 30, 1987, the end of the three-month period covered in this report. Table 2 lists the unit capacity and forced outage rate for each licensed reactor for each of the three months (July, August, and September 1987) covered in this report and the cumulative values of these parameters since the beginning of commercial operation. In addition to the tabular data, this article discusses other significant occurrences and developments that affected licensed US power reactors during this reporting period. Status changes at Braidwood Unit 1, Nine Mile Point 2, and Beaver Valley 2 are discussed. Other occurrences discussed are: retraining of control-room operators at Peach Bottom; a request for 25% power for Shoreham, problems at Fermi 2 which delayed the request to go to 75% power; the results of a safety study of the N Reactor at Hanford; a proposed merger of Pacific Gas and Electric with Sacramento Municipal Utility District which would result in the decommissioning of Rancho Seco; the ordered shutdown of Oyster Creek; a minor radioactivity release caused by a steam generator tube rupture at North Anna 1; and 13 fines levied by the NRC on reactor licensees

  13. Radiation protection at the RA Reactor in 1984, Part -2, Annex 2a: Radioactivity control of the RA reactor environment - atmospheric precipitations, dust, water, soil, plants, fruit.

    International Nuclear Information System (INIS)

    Ajdacic, N.; Martic, M.; Jovanovic, J.

    1984-01-01

    Control of radioactivity in the biosphere in the vicinity of the RA reactor is part of the radioactivity control done regularly for the whole territory of the Vinca institute. During 1984 control was conducted according to the plan. According to the measured data no significant changes have been found in the surroundings of the RA reactor. All the analysed samples have followed the activity values of the precipitations

  14. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    THE OPERATING UNITS STATUS REPORT - LICENSED OPERATING REACTORS provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management from the Headquarters staff of NRC's Office of Enforcement (OE), from NRC's Regional Offices, and from utilities. The three sections of the report are: monthly highlights and statistics for commercial operating units, and errata from previously reported data; a compilation of detailed information on each unit, provided by NRC's Regional Offices, OE Headquarters and the utilities; and an appendix for miscellaneous information such as spent fuel storage capability, reactor-years of experience and non-power reactors in the US

  15. Reactor operation method

    International Nuclear Information System (INIS)

    Osumi, Katsumi; Miki, Minoru.

    1979-01-01

    Purpose: To prevent stress corrosion cracks by decreasing the dissolved oxygen and hydrogen peroxide concentrations in the coolants within a reactor container upon transient operation such as at the start-up or shutdown of bwr type reactors. Method: After a condensate has been evacuated, deaeration operation is conducted while opening a main steam drain line, as well as a main steam separation valve and a by-pass valve in a turbine by-pass line connecting the main steam line and the condenser without by way of a turbine, and the reactor is started-up by the extraction of control rods after the concentration of dissolved oxygen in the cooling water within a pressure vessel has been decreased below a predetermined value. Nuclear heating is started after the reactor water has been increased to about 150 0 C by pump heating after the end of the deaeration operation for preventing the concentration of hydrogen peroxide and oxygen in the reactor water from temporarily increasing immediately after the start-up. The corrosive atmosphere in the reactor vessel can thus be moderated. (Horiuchi, T.)

  16. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  17. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1990-03-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  18. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-08-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  19. Reactor operational transient analysis

    International Nuclear Information System (INIS)

    Shin, W.K.; Chae, S.K.; Han, K.I.; Yang, K.S.; Chung, H. D.; Kim, H.G.; Moon, H.J.; Ryu, Y.H.

    1983-01-01

    To build up efficient capability of safety review and inspection for the nuclear power plants, four area of studies have performed as follows: 1) In order to search the most optimized operating method during load follow operating schemes, automatic control and normal control, are compared each other under the CAOC condition. The analysis performed by DDID code has shown that the reactor has to be controlled by the operator manually during load follow operation. 2) Through the sensitivity analysis by COBRA code, the operating parameters, such as coolant pressure, flow rate, inlet temperature, and power distribution are shown to be important to the determination of DNBR. Expecially, inlet temperature of primary coolant system is appeared as the most senstive parameter on DNBR. 3) FRAPCON code is adapted to study the sensitivity of several operational parameters on the mechanical properties of reactor fuel rod. 4) The calculations procedure which is required to be obtained the neutron fluence at the reactor vessel and the spectrum at the surveillance capsule is established. The results of computation are conpared with those of FSAR and SWRI report and proved its applicability to reactor surveillance program. (Author)

  20. Method of reactor operation

    International Nuclear Information System (INIS)

    Maeda, Katsuji.

    1982-01-01

    Purpose: To prevent stress corrosion cracks in stainless steels caused from hydrogen peroxide in reactor operation in which the density of hydrogen peroxide in the reactor water is controlled upon reactor start-up. Method: A heat exchanger equipped with a heat source for applying external heat is disposed into the recycling system for reactor coolants. Upon reactor start-up, the coolants are heated by the heat exchanger till arriving at a temperature at which the dissolving rate is faster than the forming rate of hydrogen peroxide in the coolants, and nuclear heating is started after reaching the above temperature. The temperature of the reactor water is increased in such a manner and, when it arrives at 140 0 C, extraction of control elements is started and the heat source for the heat exchanger is interrupted simultaneously. In this way spikes in the density of hydrogen peroxide are suppressed upon reactor start-up to thereby decrease the stress corrosion cracks in stainless steels. (Horiuchi, T.)

  1. Measurements at the RA Reactor related to the VISA-2 project - Part 1, Start-up of the RA reactor and measurement of new RA reactor core parameters; Fizicka merenja na reaktoru RA u vezi projekta VISA-2 - I deo, Pustanje u rad reaktora RA i merenje fizickih parametara novog jezgra reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Markovic, H [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1962-07-15

    The objective of the measurements was determining the neutron flux in the RA reactor core. Since the number of fuel channels is increased from 56 to 68 within the VISA-2 project, it was necessary to attain criticality of the RA reactor and measure the neutron flux properties. The 'program of RA reactor start-up' has been prepared separately and it is included in this report. Measurements were divided in two phases. First phase was measuring of the neutron flux after the criticality was achieved but at zero power. During phase two measurements were repeated at several power levels, at equilibrium xenon poisoning. This report includes experimental data of flux distributions and absolute values of the thermal and fast neutron flux in the RA reactor experimental channels and values of cadmium ratio for determining the neutron epithermal flux. Data related to calibration of regulatory rods for cold un poisoned core are included. [Serbo-Croat] Svrha merenja je odredjivanje neutronskog fluksa u reaktoru RA. S obzirom na uvecani broj tehnoloskih kanala of 56 na 68 u vezi projekta VISA-2, bilo je potrebno ponovo dovesti reaktora RA do kriticnosti i izvrsiti merenja karakteristika fluksa neutrona. Posebno je pripremljen 'program pustanja u pogon reaktora RA', koji je sadrzan u ovom dokumentu. Program merenja bio je podeljen na dve faze. Prva faza je merenje fluksa pre podizanju reaktora na nominalnu snagu. Slicna merenja vrsena su i na vecim snagama u drugoj fazi, pod uslovima ravnoteznog zatrovanja reaktora ksenonom, jer se tada pokazuju izvesne promene u odgovarajucim karakteristikama fluksa neutrona. Ovaj izvestaj sadrzi merene vrednosti raspodele fluksa i apsolutne vrednosti termalnih i brzih neutrona kao i kadmijumskih odnosa koji su korisceni za odredjivanje fluksa epitermalnih neutrona. Opisana je kalibracija regulacionih sipki za hladan nezatrovan reaktor.

  2. Small reactor operating mode

    International Nuclear Information System (INIS)

    Snell, V.G.

    1997-01-01

    There is a potential need for small reactors in the future for applications such as district heating, electricity production at remote sites, and desalination. Nuclear power can provide these at low cost and with insignificant pollution. The economies required by the small scale application, and/or the remote location, require a review of the size and location of the operating staff. Current concepts range all the way from reactors which are fully automatic, and need no local attention for days or weeks, to those with reduced local staff. In general the less dependent a reactor is on local human intervention, the greater its dependence on intrinsic safety features such as passive decay heat removal, low-stored energy and limited reactivity speed and depth in the control systems. A case study of the design and licensing of the SLOWPOKE Energy System heating reactor is presented. (author)

  3. A Small-Animal Irradiation Facility for Neutron Capture Therapy Research at the RA-3 Research Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Emiliano Pozzi; David W. Nigg; Marcelo Miller; Silvia I. Thorp; Amanda E. Schwint; Elisa M. Heber; Veronica A. Trivillin; Leandro Zarza; Guillermo Estryk

    2007-11-01

    The National Atomic Energy Commission of Argentina (CNEA) has constructed a thermal neutron source for use in Boron Neutron Capture Therapy (BNCT) applications at the RA-3 research reactor facility located in Buenos Aires. The Idaho National Laboratory (INL) and CNEA have jointly conducted some initial neutronic characterization measurements for one particular configuration of this source. The RA-3 reactor (Figure 1) is an open pool type reactor, with 20% enriched uranium plate-type fuel and light water coolant. A graphite thermal column is situated on one side of the reactor as shown. A tunnel penetrating the graphite structure enables the insertion of samples while the reactor is in normal operation. Samples up to 14 cm height and 15 cm width are accommodated.

  4. Report of the reactor Operators Service - Annex F

    International Nuclear Information System (INIS)

    Zivotic, Z.

    1990-01-01

    RA reactor operators service is organized in two groups: permanent staff (chief operator, chief shift operators and operators) and changeable group which is formed according to the particular operation needs for working in shifts. During 1989 the operators service staff participated in the following activities: reconstruction of the existing reactor systems, control of the emergency cooling system, construction of the experimental loop 'Vinca-1'. Education of the staff was organized through routine courses, practical training is foreseen for 1991 [sr

  5. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-11-01

    The US Nuclear Regulatory Commission's monthly Licensed Operating Reactors Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the errata page

  6. RA Research reactor, Annual report 1969; Istrazivacki nuklearni reaktor RA - Izvestaj za 1969. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1969-12-15

    During 1969, the RA Reactor was operated at nominal power of 6.5 MW for 200 days, and 15 days at lower power levels. Total production mounted to 31131 MWh which is 3.77% higher than planned. Reactor was used for irradiation and experiments according to the demand of 463 users from the Institute and 63 external users. This report contains detailed data about reactor power and experiments performed in 1969. It is concluded that the reactor operated successfully according to the plan. If there had been no problems with power supply during last three months and Danube low water level in September and October the past year would have been the most successful up to now. The number od scram shutdowns was not higher than during past two years in spite of the difficulties in the last quarter. There were three incidents which caused higher personnel exposure during operation. One, was the destruction of the canner with silver (because the time spent in the core was too long) which caused the surface contamination of the platform, the background radiation was 10 to 100 times higher than regular. The other two cases were caused by failure of the device for handling the fuel slugs in the fuel channels during refuelling. Reactor refuelling was done four times during 1969, and 499 fresh fuel slugs were used. Refuelling applied the approach of 'mixing' the fresh fuel slugs with the 'old' fuel slugs in the fuel channel. Decontamination of surfaces was on the same level as previously in spite of the problems with silver. Since two staff members have left, the present number od employees is now the minimum needed for reactor operation and maintenance. It is stated that the operation of components and equipment is on sufficiently high level after ten years of reactor operation. The action plan for 1970 is made according to the same principles as in previous four years but the planned production is decreased to 25000 MWh, because control of important components is needed after ten

  7. Licensed operating reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units is provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  8. Licensed operating reactors

    International Nuclear Information System (INIS)

    1989-06-01

    The US Nuclear Regulatory Commission's monthly LICENSED OPERATING REACTORS Status Summary Report provides data on the operation of nuclear units as timely and accurately as possible. This information is collected by the Office of Information Resources Management, from the Headquarters Staff of NRC's Office of Inspection and Enforcement, from NRC's Regional Offices, and from utilities. Since all of the data concerning operation of the units are provided by the utility operators less than two weeks after the end of the month, necessary corrections to published information are shown on the ERRATA page. This report is divided into three sections: the first contains monthly highlights and statistics for commercial operating units, and errata from previously reported data; the second is a compilation of detailed information on each unit, provided by NRC Regional Offices, IE Headquarters and the Utilities; and the third section is an appendix for miscellaneous information such as spent fuel storage capability, reactor years of experience and non-power reactors in the United States

  9. Licensing of nuclear reactor operators

    International Nuclear Information System (INIS)

    1979-09-01

    Recommendations are presented for the licensing of nuclear reactor operators in units licensed according to the legislation in effect. They apply to all physical persons designated by the Operating Organization of the nuclear reactor or reactors to execute any of the following functional activities: a) to manipulate the controls of a definite reactor b) to direct the authorized activities of the reactor operators licesed according to the present recommendations. (F.E.) [pt

  10. Reactor operation monitor

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1982-01-01

    Purpose: To improve the working performance of a reactor by extending the range for the power conditioning due to the control rod operation and flow rate control. Constitution: The results of calculations for the power distribution and the burn-up degree distribution of the reactor core from a reactor performance computer that processes each of measuring signals in a nuclear power plant are used as the inputs for a computing device of the fuel rod power hysteresis to form the power hysteresis for each of the fuel rods up to the present time. The data are used as the inputs for the computing device of the fuel rod performance index, and the fuel rod performance index representing the critical values for the stresses in the fuel rod cladding tubes and the critical values for the duration of the stresses determined from the power hysteresis and the burn-up degree of the fuel rod are calculated for each of the fuel rods. Accordingly, the power conditioning can be carried out upon power-up in the reactor while monitoring the fuel rod performance index f(t) for each of the fuel assemblies, whereby the range for the power conditioning due to the control rod operation and the flow rate control can be extended relative to fuel assemblies in which f(t) is smaller than 1. (Yoshino, Y.)

  11. Tasks related to increase of RA reactor exploitation and experimental potential, 04. Device for transport of radioactive reactor channels and semi channels of the RA reactor, design project (I-III) Part II, Vol. II; Radovi na povecanju eksploatacionih i eksperimentalnih mogucnosti reaktora RA, 04. Uredjaj za transport aktivnih tehnoloskih kanala I semikanala reaktora RA - izrada projekta (I-III), II Deo, Album II

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-07-15

    This second volume includes calculations of the main components of the transporter, description of the mechanical part of the transporter and the engineering drawing of the device for transport of radioactive reactor channels and semi channels of the RA reactor.

  12. Safety analysis of the present status of the research reactor 'RA' at 'Vinca' Institute

    International Nuclear Information System (INIS)

    Jovic, V.; Jovic, L.; Zivotic, Z.; Milovanovic, Dj.

    1995-01-01

    Safety analysis of the nuclear facility which has been out of work for a long time and whose future is not defined at the present moment, can not be connected to the usual, normatively regulated system analysis procedure in both operational and accidental regimes. Therefore, the safety analysis of the present status of the present status of the reactor RA is related to system and components analysis which, in present conditions maintain their nuclear functions operational. In the first place, it refers to components and equipment in which radioactive radiation generation still exists and to installations and equipment maintaining radiation level below permitted limit. in the context of the analysis the following areas are being covered: present status characteristics, accidental events while operating period from 1959. to 1984., nuclear fuels and radioactive waste inventory, basic characteristics and status of safety-related systems and equipment, radiation protection, potential accident analysis at present status of the reactor RA, potential accidental situations due to natural events (earthquakes, water flood) or man-induced events and security. 8 refs

  13. Project RA Research nuclear reactor - Annual report 1993 with comparative review for the period 1991 - 1993; Projekat Istrazivacki nuklearni reaktor RA - Izvestaj za 1993. godinu, uz uporedni pregled za period 1991 - 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-15

    Research reactor RA Annual report for year 1993 is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. First part includes 8 annexes describing reactor operation, activities of services for maintenance of reactor components and instrumentation, financial report and staffing. The ninth separate annex deals with the feasibility of RA reactor applications. Second part of the report is devoted to radiation protection issues and contains 4 annexes with data about radiation control of the working environment and reactor environment, description of decontamination activities, collection of radioactive wastes, and meteorology data. [Serbo-Croat] Godisnji izvestaj o radu nuklearnog reaktora RA za 1993. godinu sastoji se od dva dela: prvi deo obuhvata pogon i odzavanje reaktora RA, a drugi poslove zastite od zracenja na reaktoru RA. Prvi deo sadrzi 8 priloga, koji opisuju rad reaktora i poslove sluzbi za odrzavanje opreme i komponenti, finansijski izvestaj, kadrovsku strukturu osoblja reaktora. Poseban prilog razmatra mogucnosti koriscenja istrazivackog reaktora RA. Drugi deo izvestaja o poslovima zastite od zracenja sadrzi 4 priloga sa podacima radijacione kontrole radne sredine i okoline reaktora, opis poslova dekontaminacije i sakupljanja radioaktivnih materija, kao i meteoroloske podatke.

  14. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1981-08-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  15. Nuclear Reactor RA Safety Report, Vol. 5, Reactor cooling systems; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 5, Hladjenje reaktora i pripadajuci sistemi

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    RA reactor cooling system enable cooling during normal operation and under possible accidental conditions and include: technical water system, heavy water system, helium gas system, system for heavy water purification and emergency cooling system. Primary cooling system is a closed heavy water circulation system. Heavy water system is designed to enable permanent circulation and twofold function of heavy water. In the upward direction of cooling it has a coolant role and in the downward direction it is the moderator. Separate part of the primary coolant loop is the system for heavy water purification. This system uses distillation and ion exchange processes. [Serbo-Croat] Sistemi za hladjenje reaktora RA obezbedjuju hladjenje u svim rezimima eksploatacije i potenijalno udesnim satnjim i obuhvataju: sistem tehnicke vode, sistem teske vode, gasni sistem helijuma, sistem za preciscavanje teske vode i sistem za akcidentalno hladjenje. Primarni sistem za hladjenje je zatvoreni cirkulacioni sistem teske vode. Specificnost sistema teske vode vezana je za neprekidnost cirkulacije i razlicite funkcije teske vode. U uzlaznom strujanju, teske vode ima ulogu hladioca a u silaznom ulogu moderatora. Poseban deo primarnog sistema predstavlja sistem za preciscavanje teske vode. Ovaj sistem koristi destilacioni i jonoizmenjivacki postupak.

  16. TRIGA reactor operating experience

    International Nuclear Information System (INIS)

    Anderson, T.V.

    1970-01-01

    The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections

  17. RA Research reactor, Annual report 1973; Istrazivacki nuklearni reaktor RA - Izvestaj za 1973. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1973-12-15

    During 1973, RA reactor was operated at nominal power for 4687 hours and 54 hours at lower power levels. The total production was 30504 MWh which is 1.6% higher than planned. Practically there was no discrepancies from the plan, since the action plan was corrected at the beginning of this year caused by the demand of changing the schedule for refuelling for the purpose of 'power excursion' experiment. The reactor was used for irradiation and experiments according to the demand of 336 users. This report contains detailed data about reactor power and experiments performed in 1973. Total number safety shutdowns was 12, of which 7 were caused by power cuts. Three shutdowns caused by failures of the equipment were caused by failures of new electronic tubes. Two shutdowns were caused by the operators. There have been three shorter interruptions announced power cuts. Total personnel exposure dose was lower than during previous years. There were no accidents during this year. Decontamination of surfaces was less than during previous years. Practically there was no surface contamination, and the quantity of collected radioactive waste was lower than previously. There were no liquid radioactive effluents. It was concluded that the successful operation in 1973 has a special significance taking into account the financial crisis. There still remains a number of unsolved problems related to: completing the inventory of spare parts, exchange of some elements of the equipment, exchange of instrumentation, and purchase of the highly enriched fuel. [Serbo-Croat] Reaktor RA je u 1973. godini radio na nominalnoj snazi 4687 sati i 54 sata na manjim snagama. Ukupni rad iznosio je 30504 MWh odnosno 1,6% vise od planiranog. Prakticno nije bilo odstupanja od plana rada koji je pocetkom godine korigovan zbog promene planiranih izmena goriva usled izvodjenja eksperimenta 'ekskurzije snage'. Reaktor je koriscen za ozracivanja i eksperimente za 336 korisnika. Ovaj izvestaj sadrzi detaljne

  18. Method of reactor operation

    International Nuclear Information System (INIS)

    Nakajima, Takeshi

    1988-01-01

    Purpose: To minimize the power change due to the increase in xenone and power distribution after reaching the rated power in the case of using fresh fuels no requiring conditioning operation thereby starting the nuclear reactor in a short period of time and stably. Method: When control rods are entirely inserted only with a purpose for the compensation of the reactivity in a xenon-unsaturated state such as upon starting of the nuclear reactor, peaking is generated in the lower portion of the reactor core. Therefore, it is necessary to insert control rods for additionally suppressing the peaking in the lower portion of the reactor core to a relatively shallow level. In view of the above, a plurality of control rods are divided into a first control rod group finally inserted in the rated power state and a second control rod group other than the above. Then, the power is once elevated to the rated power level by means of such an intermediate control rod pattern that the ratio of the total extraction amount between the first control rod group and the second control rod group is made constant. Then, the control rods are extracted stepwise while setting the ratio of the total extraction amount constant in accordance with the change of the accumulating amount of xenone, to thereby obtain the purpose. (kamimura, M.)

  19. Measurement of transient hydrodynamic characteristics of the reactor RA primary cooling system

    International Nuclear Information System (INIS)

    Jovic, L.; Majstorovic, D.; Zeljkovic, I.

    1987-01-01

    Experimental study of transient hydrodynamic characteristics of the research nuclear reactor RA by simultaneous measurements of fluid flow and pressure on several locations of the RA primary coolant system is done. Loss of electric power transient on the main circulation pumps is simulated. measurement methodology, data processing and results of measured data analysis are given. (author)

  20. Licensed operating reactors

    International Nuclear Information System (INIS)

    1991-08-01

    The Nuclear Regulatory Commission's annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar 1990) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  1. Licensed operating reactors

    International Nuclear Information System (INIS)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided

  2. Analysis of a possible experimental assessment of a prototype fuel element containing burnable poison in the RA-3 reactor

    International Nuclear Information System (INIS)

    Lerner, Ana Maria; Madariaga, Marcelo

    2002-01-01

    The Argentine RA-3 research reactor (5 MW) is presently operated with LEU fuel by the National Atomic Energy Commission (CNEA). It belongs to the group of nuclear installations controlled, from the radiological and nuclear safety point of view, by the Nuclear Regulatory Authority (ARN). A new type of fuel elements containing burnable absorbers, with similar enrichment as the standard fuel elements but greater fissile contents, has recently been proposed for a new Argentine reactor design (RRR). In this framework the ARN considers interesting, if technically possible, the performance of an experiment in the RA-3 reactor. The experiment might enable, for such fuel element containing burnable poison, the verification of its neutronic behaviour under irradiation as well as a validation of the calculation line by comparison to measured values. It should be desirable that such experiment could reproduce as much as possible those conditions estimated for the RRR reactor, still under design in Argentina, having Silicide fuel elements with burnable poison, in the shape of cadmium wires in their structure. We here analyse a possible experiment consisting in the loading of a prototype fuel element with burnable poison in a normally loaded RA-3 core configuration. It would essentially be a standard RA-3 fuel element, having cadmium wires in its frame. This experiment would enable the verification of the prototype behaviour under irradiation, its operation limits and conditions, and particularly, the reactivity safety margins established in Argentine Standards, both calculated and measured. The main part of the experiment would imply some 200 full power days of operation at 5 MW, which would be drastically reduced if the reactor power is increased to 10 MW, as foreseen. We also show that under the proposed conditions, the experiment would not represent a significant penalty to the reactor normal operation. (author)

  3. The epithermal neutron-flux distribution in the reactor RA - Vinca

    International Nuclear Information System (INIS)

    Marinkov, V.; Bikit, I.; Martinc, R.; Veskovic, M.; Slivka, J.; Vaderna, S.

    1987-01-01

    The distribution of the epithermal neutron flux in the reactor RA - Vinca has been measured by means of Zr - activation detectors. In the channel VK-8 non-homogeneous flux distribution was observed (author) [sr

  4. Fast neutron flux in the RA reactor experimental channels; Fluks brzih neutrona u eksperimentalnim kanalima reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N; Dobrosavljevic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Fast neutron flux in the RA reactor experimental channels was determined by using threshold reaction detectors. The (n,p) type reactions S{sub 32} (n,p)P{sub 32}, and Al{sub 24} (n,p)Na{sub 24}. Prepared sulphur and phosphorous foils were placed in cadmium boxes and irradiated in experimental channels VK-5, VK-7 and VK-9. Gold foils were irradiated simultaneously for controlling the reactor power. Reactor power was 100 kW during irradiation of half an hour. Activity of P{sub 32} and S{sub 31} after reactor shutdown was measured by 4{pi} counter and three calibrated GM counters. Absolute neutron flux was determined by using thus obtained data.

  5. Thermal hydraulic modelling of the Mo and Iridium irradiation facilities of the RA10 reactor

    International Nuclear Information System (INIS)

    Gramajo, M.; García, J.; Marcel, C.P.

    2013-01-01

    The RA-10 reactor is a multipurpose, open pool research reactor. The core consists of a rectangular array of MTR type fuel. The produced thermal power is 30 MW which is extracted by the refrigeration system via an ascendant flow through the core. The core reflector is D 2 O contained in a watertight tank. The design of the reactor includes a number of out-core facilities which are meant to be used for industrial, medical and research purposes. Among all the facilities, the most important ones are the Molybdenum and Iridium ones which we modeled in this work. During the normal operation of the reactor, the manipulation and the on-line extraction of the irradiation facilities is foreseen. Therefore the study of the head loss during the normal operation as well as during the extraction maneuvers plays a relevant role in the design and safety analysis. In this work a CFD commercial code is use dto perform the calculations needed to guarantee the design requirements.In addition, a full detailed geometric model for both, the Molybdenum and Iridium facilities,is used to perform the required simulations. The obtained results allow to evaluating the thermal-hydraulic performance of the proposed facilities designs. (author)

  6. Decommissioning strategy for the 'RA' research nuclear reactor at the 'Vinca' Institute

    International Nuclear Information System (INIS)

    Matausek, M.V.

    2000-01-01

    Adopting the global strategy for decommissioning of the research reactor RA at the Vinca Institute and preliminary planning of particular activities is necessary independently on the decision of the future status of this reactor, namely even in the case that it is decided to complete the modernization and to use the reactor again. In this paper the global decommissioning strategy for the RA reactor is proposed, as well as the optimal time schedule of particular activities, based on the relevant experiences from other countries (author) [sr

  7. Nuclear Reactor RA Safety Report, Vol. 13, Causes of possible accidents

    International Nuclear Information System (INIS)

    1986-11-01

    This volume includes the analysis of possible accidents on the RA research reaktor. Any unwanted action causing decrease of integrity of any of the reactor safety barriers is considered to be a reactor accident. Safety barriers are: fuel element cladding, reactor vessel, biogical shield, and reactor building. Reactor accidents can be classified in four categories: (1) accidents caused by reactivity changes; (2) accidents caused by mis function of the cooling system; (3) accidents caused by errors in fuel management and auxiliary systems; (4) accidents caused by natural or other external disasters. The analysis of possible causes of reactor accidents includes the analysis of possible impacts on the reactor itself and the environment [sr

  8. Reactor operation method

    International Nuclear Information System (INIS)

    Suzuki, Toshio; Hida, Kazuki; Yoshioka, Ritsuo.

    1990-01-01

    The enrichment degree of fuels initially loaded in a reactor core was made extremely lower than that of fresh fuels to be loaded in the succeeding cycle, or the enrichment degree for all of the initially loaded fuels was made identical with that of the fresh fuels in the conventional reactor operation method. In this operation method, since the initially loaded fuels are sometimes taken out after the completion of the cycle at the low burnup degree as it is, it can not be said to reduce the fuel cycle cost. As a means for dissolving this problem, at least two different kinds of initially loaded fuels are prepared. The enrichment degree of the highly enriched fuels is made identical with that of the fresh fuels, and the enrichment degree and the number of low enriched fuels are not changed after the completion of the first cycle but they are operated till the end of the second cycle. Further, all of the fuels at the low enrichment degree are taken out after the completion of the second cycle and exchanged with the fresh fuels. As a result, high burnup ratio of the initially loaded fuels can be increased, to improve the fuel economy. (I.S.)

  9. Nuclear reactor operator licensing

    International Nuclear Information System (INIS)

    Bursey, R.J.

    1978-01-01

    The Atomic Energy Act of 1954, which was amended in 1974 by the Energy Reorganization Act, established the requirement that individuals who had the responsibility of operating the reactors in nuclear power plants must be licensed. Section 107 of the act states ''the Commission shall (1) prescribe uniform conditions for licensing individuals; (2) determine the qualifications of such individuals; and (3) issue licenses to such individuals in such form as the Commission may prescribe.'' The article discusses the types of licenses, the selection and training of individuals, and the administration of the Nuclear Regulatory Commission licensing examinations

  10. Nuclear Reactor RA Safety Report, Vol. 9, Radiation protection; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 9, Zastita od zracenja

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    Instrumentation for Radiation protection existing at the RA reactor is dating mostly from the period 1957-1959 when the reactor has been built. With some minor exception it was produced in USSR. Radiation protection system was constructed based on specific design project, somewhat modified original USSR project which has been indispensable because of some modification of the building design. During the past 27 years no renewal of the instrumentation was done, only maintenance was performed. Instrumentation consists of old electronic devices which caused difficulties and even prevented regular maintenance because of lack of spare parts. Instrumentation for radiation protection at the RA reactor is classified as follows: centralized dosimetry system; stationary dosimetry instrumentation, movable and personal dosimetry systems. Apart from the scheme of dosimetry instrumentation this volume includes description of radiation protection procedures; protection devices; radiation doses and dose limit data; program for environmental radioactivity control; medical control procedures. [Serbo-Croat] Instrumentacija za zastitu od zracenja koja danas postoji na reaktoru RA najvecim delom potice iz perioda 1957-1959 kada je reaktor gradjen. Sa malim izuzetcima instrumentacija je proizvedena u SSSR. Sistem za zastitu izveden je na osnovu posebnog projekta koji predstavlja modifikaciju originalnog projekta koja je bila neophodna usled modifikovanog gradjevinskog projekta. U proteklom periodu od 27 godina instrumentacija nije obnavljana vec je vrseno samo odrzavanje. Instrumentacija je izradjena u danas prevazidjenoh tehnoligiji (elektronske cevi) sto je otezavalo i skoro onemogucavalo normalno odrzavanje. Instrumentacija za zastitu od zracenja na reaktoru RA moze se podeliti na tri dela: centralizovani dozimetrijski sistem; stacionarna dozimetrijska instrumentacija; prenosna i licna dozimetrijska instrumentacija. Pored seme sistema dozimetrijske kontrole ova knjiga sadrzi opis

  11. Collaborative Physical and Biological Dosimetry Studies for Neutron Capture Therapy at the RA-1 Research Reactor Facility

    Energy Technology Data Exchange (ETDEWEB)

    David W. Nigg; Amanda E. Schwint; John K. Hartwell; Elisa M. Heber; Veronica Trivillin; Jorge Castillo; Luis Wentzeis; Patrick Sloan; Charles A. Wemple

    2004-10-01

    Initial physical dosimetry measurements have been completed using activation spectrometry and thermoluminiscent dosimeters to characterize the BNCT irradiation facility developed at the RA-1 research reactor operated by the Argentine National Atomic Energy Commission in Buenos Aires. Some biological scoping irradiations have also been completed using a small-animal (hamster) oral mucosa tumor model. Results indicate that the RA-1 neutron source produces useful dose rates but that some improvements in the initial configuration will be needed to optimize the spectrum for thermal-neutron BNCT research applications.

  12. Collaborative Physical and Biological Dosimetry Studies for Neutron Capture Therapy at the RA-1 Research Reactor Facility

    Energy Technology Data Exchange (ETDEWEB)

    Nigg, D.W.; Schwint, A.E.; Hartwell, J.K.; Heber, E.M.; Trivillin, V.; Castillo, J.; Wentzeis, L.; Sloan, P.; Wemple, C.A.

    2004-10-04

    Initial physical dosimetry measurements have been completed using activation spectrometry and thermoluminiscent dosimeters to characterize the BNCT irradiation facility developed at the RA-1 research reactor operated by the Argentine National Atomic Energy Commission in Buenos Aires. Some biological scoping irradiations have also been completed using a small-animal (hamster) oral mucosa tumor model. Results indicate that the RA-1 neutron source produces useful dose rates but that some improvements in the initial configuration will be needed to optimize the spectrum for thermal-neutron BNCT research applications.

  13. Modelling of the RA-1 reactor using a Monte Carlo code; Modelado del reactor RA-1 utilizando un codigo Monte Carlo

    Energy Technology Data Exchange (ETDEWEB)

    Quinteiro, Guillermo F; Calabrese, Carlos R [Comision Nacional de Energia Atomica, General San Martin (Argentina). Dept. de Reactores y Centrales Nucleares

    2000-07-01

    It was carried out for the first time, a model of the Argentine RA-1 reactor using the MCNP Monte Carlo code. This model was validated using data for experimental neutron and gamma measurements at different energy ranges and locations. In addition, the resulting fluxes were compared with the data obtained using a 3D diffusion code. (author)

  14. Radiation protection at the RA Reactor in 1985, Part -4, decontamination and treatment of solid radioactive materials for the needs of RA reactor

    International Nuclear Information System (INIS)

    Plecas, I.; Vukovic, Z.; Blagojevic, R.; Kostadinovic, A.

    1985-01-01

    This report describes the activity of the decontamination and treatment team for the needs of the RA reactor, its equipment, working conditions, methods for decontamination, means of decontamination, type and quantity of decontaminated surfaces, number of decontaminated objects, quantity of collected radioactive solid wastes, their packaging, transport to the storage place and topography od radiation field in the storage during 1985 [sr

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis

  16. Conclusions of the experts group of the RA reactor at the meeting held on November 2 and 3 1964 - Annex 12a; Prilog 12a - Zakljucci sa sastanka Strucnog kolegijuma reaktora RA odrzanog na dan 2. i 3. novembra 1964. godine

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    Conclusions of the experts group of the RA reactor are related to: analyses of reactor operation at 6.5 MW power with heavy water coolant flow of 250 m{sup 3}/h (2 pumps rotation speed 1500 rotations/min); decisions of future operation; further preparation activities related to reactor operation in forced regime and reduced cooling conditions.

  17. Feasibility study to restart the research reactor RA with a converted core

    International Nuclear Information System (INIS)

    Matausek, M.V.; Plecas, I.; Marinkovic, N.

    1999-01-01

    Main options are specified for the future status of the 6.5 MW heavy water research reactor RA. Arguments pro and contra restarting the reactor are presented. When considering the option to restart the RA reactor, possibilities to improve its neutronic parameters, such as neutron flux values and irradiation capabilities, are discussed, as well as the compliance with the worldwide activities of Reduced Enrichment for Research and Test Reactors (RERTR) program. Possibility of core conversion is examined. Detailed reactor physics design calculations are performed for different fuel types and uranium loading. For different fuel management schemes results are presented for the effective multiplication factor, power distribution, fuel burnup and consumption. It is shown that, as far as reactor core parameters are considered, conversion to lower enrichment fuel could be easily accomplished. However, conversion to the lower enrichment could only be justified if combined with improvement of some other reactor attributes. (author)

  18. Design study of eventual core conversion for the research reactor RA

    International Nuclear Information System (INIS)

    Matausek, M. V.; Marinkovic, N.

    1998-01-01

    Main options are specified for the future status of the 6.5 MW heavy water research reactor RA. Arguments pro and contra restarting the reactor are presented. When considering the option to restart the RA reactor, possibilities to improve its neutronic parameters, such as neutron flux values and irradiation capabilities are discussed, as well as the compliance with the worldwide activities of Reduced Enrichment for Research and Test Reactors (RERTR) program. Possibility of core conversion is examined. Detailed reactor physics design calculations are performed for different fuel types and uranium loading. For different fuel management schemes results are presented for the effective, multiplication factor, power distribution, fuel burnup and consumption. It is shown that, as far as reactor core parameters are considered, conversion to lower enrichment fuel could be easily accomplished. However, conversion to the lower enrichment could only be justified if combined with improvement of some other reactor attributes. (author)

  19. Reactor operation safety information document

    Energy Technology Data Exchange (ETDEWEB)

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  20. Up-dating of the RA-0 reactor shielding. Gamma and neutron isodoses

    International Nuclear Information System (INIS)

    Murua, Carlos A.; Chautemps, Norma A.; Ackerley, Alejandro F.; Alexeiew, Vladimiro

    1999-01-01

    A comparative analysis of the historical shielding configurations of the RA-0 reactor is performed and the comparison methodology is described. The gamma and neutron dose mapping of the last two stages of the reactor shielding has been carried out and the results are analysed

  1. Tasks related to increase of RA reactor exploitation and experimental potential, 02. Verification of the system for detecting failures of the RA reactor fuel element cladding; Radovi na povecanju eksploatacionih i eksperimentalnih mogucnosti reaktora RA, 02. Provera sistema za detekciju pucanja kosuljice gorivnog elementa reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-07-15

    For the purpose of this task it was necessary to analyze the time dependent distribution of fission products in the fuel element and leaks through the cracks in the cladding; to calculate the quantity of solid fission products, volatile fission products and fission gases for the RA reactor; to collect the data for estimating the activity of the short-living isotopes created by neutron irradiation of D{sub 2}O; analyze the number of delayed neutrons in D{sub 2}O. Experiment were needed to estimate the distribution of Xe and Kr in the heavy water in the reactor channel and analyze the activity of D{sub 2}O and helium based on reactor operation data. For the purpose of verifying the efficiency and safety of the existing system for detecting the cracks of the fuel element cladding is presented in this report together with the review of similar systems at a number of reactors in the world.

  2. New experimental space for irradiating samples by RA reactor fast neutron flux at temperatures up to 100 deg C

    International Nuclear Information System (INIS)

    Pavicevic, M.; Novakovic, M.; Zecevic, V.

    1961-01-01

    The objective of this paper is to present adaptation of the RA reactor which would enable samples irradiation by fast neutrons and describe new experimental possibilities. New experimental space was achieved using hollow fuel elements which have been reconstructed to enable placement of irradiation capsules inside the tube. This paper includes thermal analysis and describes problems related to operation, safety and radiation protection issues which arise from using reconstructed fuel elements

  3. Power measurement of the RA-3 reactor using the neutron noise technique and {sup 16}N; Medicion de la potencia del reactor RA-3, mediante la tecnica de ruido neutronico y nitrogeno 16

    Energy Technology Data Exchange (ETDEWEB)

    Gomez, Angel [Comision Nacional de Energia Atomica, General San Martin (Argentina). Dept. Reactores y Centrales Nucleares

    2003-07-01

    This work describes a measurement method based on the neutron noise technique which is used for determining the relation between the power and the currents of two ionization chambers. These chambers are sensitive to the gamma radiation from the {sup 16}N decay produced in the RA-3 reactor core. The power during operation is obtained from the calibration factors by measuring those currents. As this calibration factors depend on the cooler flow that circulates in the reactor core and in the {sup 16}N measuring system, an estimator, that is a function of the ratio of this currents, is proposed in order to detect flow changes. (author)

  4. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Haselow, J.S.; Price, V.; Stephenson, D.E.; Bledsoe, H.W.; Looney, B.B.

    1989-12-01

    The Savannah River Site (SRS) produces nuclear materials, primarily plutonium and tritium, to meet the requirements of the Department of Defense. These products have been formed in nuclear reactors that were built during 1950--1955 at the SRS. K, L, and P reactors are three of five reactors that have been used in the past to produce the nuclear materials. All three of these reactors discontinued operation in 1988. Currently, intense efforts are being extended to prepare these three reactors for restart in a manner that protects human health and the environment. To document that restarting the reactors will have minimal impacts to human health and the environment, a three-volume Reactor Operations Environmental Impact Document has been prepared. The document focuses on the impacts of restarting the K, L, and P reactors on both the SRS and surrounding areas. This volume discusses the geology, seismology, and subsurface hydrology. 195 refs., 101 figs., 16 tabs.

  5. Nuclear Reactor RA Safety Report, Vol. 16, Maximum hypothetical accident

    International Nuclear Information System (INIS)

    1986-11-01

    Fault tree analysis of the maximum hypothetical accident covers the basic elements: accident initiation, phase development phases - scheme of possible accident flow. Cause of the accident initiation is the break of primary cooling pipe, heavy water system. Loss of primary coolant causes loss of pressure in the primary circuit at the coolant input in the reactor vessel. This initiates safety protection system which should automatically shutdown the reactor. Separate chapters are devoted to: after-heat removal, coolant and moderator loss; accident effects on the reactor core, effects in the reactor building, and release of radioactive wastes [sr

  6. Project requirements for reconstruction of the RA reactor ventilation system, Task 2.8. Measurement of radioactive iodine and other isotopes contents in the gas system of the RA reactor, Annex of the task

    International Nuclear Information System (INIS)

    Vujisic, Lj. et al

    1981-01-01

    This report is a supplement to the task 2.8. When planning and constructing the ventilation system, it was found that it is necessary to perform additional experiments during RA reactor operation at 2 MW power level for a longer period. In addition to the helium system, the potential source of radioactive pollutants is the space below the upper water shielding of the reactor. All the experimental and fuel channels are ending in this space. During repair and fuel exchange radioactivity can be released in this space. For that reason this space is important when planing and designing the filtration system for incidental conditions or planned dehermetisation of the reactor. The third point where radioactive isotope identification was done, was the entrance into the chimney during steady state operation and planned dehermetisation of the reactor. The following samples were measured: gas system during reactor operation at 2 MW power; entrance into the chimney during last 48 hours of reactor operation at 2 MW power; sample on the platform under the upper water shield with the opened fuel channel after the reactor shutdown; and simultaneously with the latter, measurement at the entrance to the chimney. This annex contains the list of identified radioactive isotopes, volatile and gaseous as well as concentration of volatile 131 I on the adsorbents [sr

  7. Method of operating a reactor

    International Nuclear Information System (INIS)

    Oosumi, Katsumi; Yamamoto, Michiyoshi.

    1980-01-01

    Purpose: To prevent stress corrosion cracking in the structural material of a reactor pressure vessel. Method: Prior to the starting of a reactor, the reactor pressure vessel is evacuated to carry out degassing of reactor water, and, at the same time, reactor water is heated. After reactor water is heated to a predetermined temperature, control rods are extracted to start nuclear heating. While the temperature of the reactor water is in a temperature range where elution of a metal which is a structural material of the reactor pressure vessel becomes vigorous and the sensitivity to the stress corrosion cracks increases, the reactor is operated at the maximum permissible temperature raising speed or maximum permissible cooling speed. (Aizawa, K.)

  8. RA Research reactor, Annual report 1972; Istrazivacki nuklearni reaktor RA - Izvestaj za 1972. godinu - Pogon i odrzavanje

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, D et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1972-12-15

    During 1972, the total production was 31151 MWh which is 3.8% higher than planned. The reactor was used for irradiation and experiments according to the demand of 381 users, of which 340 from the Institute and 41 external users. This report contains detailed data about reactor power and experiments performed in 1972. Discrepancies from the action plan, meaning higher production was achieved due to special demands of the users. Total number of interruptions was lower than during all the previous years, and were caused mainly due to announced power cuts. There was only on scram shutdown during this year caused by a false signal of the reactor control instrumentation. There were no longer interruptions. One shorter interruption (shorter than 24 hours) caused by removal of a UO{sub 2} capsule from the core, placed there for measuring heat transfer. Total personnel exposure dose was lower than during previous years. One accident caused contamination with gases and aerosols containing mainly shot-living isotopes. Decontamination od surfaces was less than during previous years. Practically there was no surface contamination that would demand action of the decontamination team, except for the regular decontamination after refueling. It was concluded that the successful operation in 1972 has a special significance having taking in account the financial crisis caused by the unresolved status of the reactor. It is emphasised, in the plan for the next year that there is an urgent need of making a long-term plan of rector application. It is indispensable to finish preparatory tasks for replacing the fuel with the highly enriched fuel elements by 1974, and building the core emergency cooling system. [Serbo-Croat] Ukupni rad Reaktora RA je u 1972. godini iznosio je 31151 MWh odnosno 3,8% vise od planiranog. Reaktor je koriscen za ozracivanja i eksperimente za 381 korisnika od cega 340 iz Instituta i 41 za korisnike izvan Instituta. Ovaj izvestaj sadrzi detaljne podatke o radu i

  9. Current activities on improving storage conditions of the research reactor RA spent fuel - Part II

    International Nuclear Information System (INIS)

    Matausek, M.V.; Kopecni, M.; Vukadin, Z.; Plecas, I.; Pavlovic, R.; Sotic, O.; Marinkovic, N.

    1998-01-01

    To minimize further corrosion and preserve integrity of aluminum barrels and the stainless steel channel-type containers that were found to contain leaking spent fuel, actions to improve conditions in the existing spent fuel storage pool at the RA research reactor were initiated. Technology was elaborated and equipment was produced and applied for removal of sludge and other debris from the bottom of the pool, filtration of the pool water, sludge conditioning in cement matrix and disposal at the low and medium waste repository at VINCA site. More sophisticated operations are to be performed together with foreign experts. Safety measures and precautions were determined. Subcriticality was proved under normal and/or possible abnormal conditions. (author)

  10. Accident conditions analysis of spent fuel storage pool RA research reactor in Vinca; Analiza udesnih stanja u odlagalistu isluzenog goriva istrazivackog rektora RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Jovic, V; Jovic, L [Institute of Nuclear Sciences VINCA, Belgrade (Serbia and Montenegro)

    2000-07-01

    Based on Safety analysis of the spent fuel pool RA research reactor in Vinca, conditions and possibilities accident sequences in present configuration storage facility are considered (author) [Serbo-Croat] Na osnovu Analize sigurnosti odlagalista isluzenog goriva istrazivackog reaktora RA u Vinci razmatraju se uslovi i mogucnosti pojave udesnih stanja u postojecoj konfiguraciji odlagalista (author)

  11. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-01-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  12. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-05-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  13. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1983-03-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  14. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-07-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  15. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-11-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  16. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-10-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  17. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-08-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  18. Operating reactors licensing actions summary

    International Nuclear Information System (INIS)

    1982-09-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program. Its content will change based on NRC management informational requirements

  19. Radiation protection at the RA Reactor in 1986, Part -2, Annex 2a, Radioactivity control of the RA reactor environment (atmospheric precipitations, dust, water, soil, plants, fruit...)

    International Nuclear Information System (INIS)

    Ajdacic, N.; Martic, M.; Jovanovic, J.

    1986-01-01

    Control of radioactivity in the biosphere in the vicinity of the RA reactor is part of the radioactivity control done regularly for the whole territory of the Vinca institute (report by the same authors included in this Annex). During 1986 control was conducted according to the plan until May 1, 1986 when a dramatic increase of the precipitations and all other samples from the biosphere was recorded. According to the measured data no significant changes have been found in the surroundings of the RA reactor, until April 29 1986. Since then more detailed control was conducted, the number of samples was increased, apart from standard measuring procedure of total beta activity measurements, gamma spectrometry of all samples was applied. High activity level of the following nuclides was found: Iodine, cerium,cesium, tellurium, ruthenium, barium, lanthanum, etc. As an example activity of ?1?3?1 I in one sample was 564±5 kBq/m 2 [sr

  20. Tasks related to increase of RA reactor exploitation and experimental potential, 03. Crane for handling the vertical experimental channels of the RA reactor - design project; Radovi na povecanju eksploatacionih i eksperimentalnih mogucnosti reaktora RA, 03. Kran za opsluzivanje vertikalnih eksperimentalnih kanala reaktora RA - izrada projekta

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-07-15

    Within the work related to improvement of experimental potential of the RA reactor, this document describes the design project of the new crane for handling the vertical experimental channels of the RA reactor, engineering drawings of the crane main elements, mechanical part, design project of the electrical part of the crane and cost estimation.

  1. Safety analysis of an irradiation device for 99Mo production in RA-3 reactor

    International Nuclear Information System (INIS)

    Lerner, Ana Maria; Madariaga, Marcelo; Waldman, Ricardo

    2000-01-01

    The Argentine RA-3 research reactor (5 MW) has been converted to LEU fuel more than nine years ago. Since then, it has been operating with LEU fuel, which has been designed and fabricated at the National Atomic Energy Commission (CNEA). The Nuclear Regulatory Authority (ARN) is the institution in charge of the installation safety control. It is under this framework that the ARN has elaborated a neutronic calculation model for the RA-3 core, paying special attention to the device presently used for the irradiation of (HEU) 235 U targets required to obtain 9 '9Mo as a fission product. A regulatory analysis of results is carried out in the framework of ARN standards for fixed experiments. For such purpose, calculated reactivity values associated with such device are compared with recently measured values at the installation. Finally, and according to guidelines established in the first part of this work, a calculation model for a new device proposed by CNEA for the irradiation of metallic (LEU) uranium targets and still at its design stage, is here analysed. (author)

  2. Radiation protection at the RA reactor in 1984, Part II c Radioactivity control in the environment of the RA reactor, Meteorology measurements

    International Nuclear Information System (INIS)

    Grsic, Z.; Zaric, M.; Nikolic, R.; Stevanovic, M.

    1984-01-01

    During 1984, meteorology measurements were continued as a part of the environmental control of the Vinca Institute. This report covers the period from December 1983 - November 1984. Part of the meteorology measurements and data analysis is adapted to the needs of the Institute, i.e. RA reactor and some Laboratories. The objective of these activities is forming the data base for solving everyday and special problems related to control, protection and safety of Institute environment

  3. Chemical dosimetry of the RA reactor at Vinca, Yugoslavia; Hemijska dozimetrija reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Gal, O; Markovic, V; Radak, B [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1969-07-01

    The ten-year work on in-pile chemical dosimetry of the Radiation chemistry Department at the Boris Kidric Institute at Vinca is reviewed. As an introduction, the general theory of the dosimetry of two-component radiation field is given and the uses of the derived equations in calorimetry and chemical dosimetry have been discussed. The chemical systems worked out for the in-pile use: solid oxalic acid and their solutions in light and heavy water, are then described and also the procedures of their use. The latter two are treated as a double system particularly suitable for two-component radiation fields. Finally, the limitations in use are discussed and some other systems, the study of which is in progress, mentioned (malonic and succinic acid) (author) [Serbo-Croat] Merenje energije koju apsorbuje sistem izlozen zracenju sastavni je deo svakog radijaciono-hemijskog eksperimenta. Time se moze objasniti veliki interes za koriscenje postojecih i razvijanje novih metoda dozimetrije u laboratorijama koje se bave radijacionom hemijom. Poslednjih godina posebna paznja se posvecuje dozimetriji vrlo visokih doza (10{sup 2}-10{sup 3} mrad) narocito onih sa kojima se radi u polju mesovitog zracenja reaktora. U laboratoriji za radijacionu hemiju Instituta 'Boris Kidric' u Vinci na dozimetriji zracenja reaktorskog jezgra radi se vec skoro 10 godina. Ta aktivnost je deo rada na hemijskoj dozimetriji uopste, kojom se bavi ova laboratorija od svog postanka (kraj 1955. godine). Sa radom na dozimetriji kod nas otpocelo se u periodu prvog podizanja na snagu reaktora RA, krajem 1959. godine. Paralelno su razvijane i primenjivane i hemijske i kalorimetrijske metode i njima vrsena dozimetrijska kalibracija reaktora. U ovom radu ucestvovalo je vise istrazivaca iz Laboratorije za radijacionu hemiju uz tesnu saradnju sa reaktorskim fizicarima i osobljem reaktora RA. Cilj ovog napisa je da sumira nas rad na hemijskoj dozimetriji reaktora. Pri tom se, najpre, zeli da ukaze na sustinu

  4. Preparation of a criticality benchmark based on experiments performed at the RA-6 reactor

    International Nuclear Information System (INIS)

    Bazzana, S.; Blaumann, H; Marquez Damian, J.I

    2009-01-01

    The operation and fuel management of a reactor uses neutronic modeling to predict its behavior in operational and accidental conditions. This modeling uses computational tools and nuclear data that must be contrasted against benchmark experiments to ensure its accuracy. These benchmarks have to be simple enough to be possible to model with the desired computer code and have quantified and bound uncertainties. The start-up of the RA-6 reactor, final stage of the conversion and renewal project, allowed us to obtain experimental results with fresh fuel. In this condition the material composition of the fuel elements is precisely known, which contributes to a more precise modeling of the critical condition. These experimental results are useful to evaluate the precision of the models used to design the core, based on U 3 Si 2 and cadmium wires as burnable poisons, for which no data was previously available. The analysis of this information can be used to validate models for the analysis of similar configurations, which is necessary to follow the operational history of the reactor and perform fuel management. The analysis of the results and the generation of the model were done following the methodology established by International Criticality Safety Benchmark Evaluation Project, which gathers and analyzes experimental data for critical systems. The results were very satisfactory resulting on a value for the multiplication factor of the model of 1.0000 ± 0.0044, and a calculated value of 0.9980 ± 0.0001 using MCNP 5 and ENDF/B-VI. The utilization of as-built dimensions and compositions, and the sensitivity analysis allowed us to review the design calculations and analyze their precision, accuracy and error compensation. [es

  5. Reactor core operation management system

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Tomomi.

    1992-05-28

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.).

  6. Reactor core operation management system

    International Nuclear Information System (INIS)

    Sato, Tomomi.

    1992-01-01

    Among operations of periodical inspection for a nuclear power plant, sequence, time and safety rule, as well as necessary equipments and the number thereof required for each of the operation are determined previously for given operation plannings, relevant to the reactor core operations. Operation items relative to each of coordinates of the reactor core are retrieved and arranged based on specified conditions, to use the operation equipments effectively. Further, a combination of operations, relative to the reactor core coordinates with no physical interference and shortest in accordance with safety rules is judged, and the order and the step of the operation relevant to the entire reactor core operations are planned. After the start of the operation, the necessity for changing the operation sequence is judged depending on the judgement as to whether it is conducted according to the safety rule and the deviation between the plan and the result, based on the information for the progress of each of the operations. Alternatively, the operation sequence and the step to be changed are planned again in accordance with the requirement for the change of the operation planning. Then, the shortest operation time can be planned depending on the simultaneous operation impossible condition and the condition for the operation time zone determined by labor conditions. (N.H.)

  7. Tritium release during inspection of reactor 'RA' at 'Vinca' institute

    International Nuclear Information System (INIS)

    Sipka, V.; Miljevic, N.; Grsic, Z.; Todorovic, D.; Radenkovic, M.

    1997-01-01

    Tritium content in daily precipitation, atmospheric water vapor inside of the reactor hall and around 'Vinca' Institute as well as in soil up to 800 m distance was monitoring during the regular inspection of the fuel channels. Tritium activity in the reactor hall air moisture was in the range from 0.022 to 6.7 MBq/m 3 . Tritium content in soil moisture between 12.7 and 530.9 Bq/l indicate a certain contamination due to tritium release in the environment, depending on the depth and distance from the place of release (author) [sr

  8. Financial report on the investment and maintenance of the RA reactor and equipment, Annex 5

    International Nuclear Information System (INIS)

    2002-01-01

    For the purpose of maintenance of the RA reactor building and equipment, Serbian Ministry of science, technology and development has approved financial support for the following: purchase and installing 12 new battery cells in the reactor building, for purchase of the missing fire protection equipment, and purchasing the material for protection of the roof of the ventilation center. All the planned tasks were fulfilled [sr

  9. Dosimetry and radiation shielding at the RA reactor, Annual report 1975, Annex 5; Prilog 5 - Dozimetrija i tehnicka zastita

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-01-15

    In the working environment at the RA reactor, the level of gamma radiation is measured continuously by the built-in stationary system. According to the needs, measurement are done in the reactor hall every day. The level of gamma radiation is measured separately in typical points when the reactor is operated at nominal power and during intervals between two operating campaigns. The level of neutron radiation is measured according to the needs by means of a mobile spherical neutron detector. These measurements are done in the reactor hall around the horizontal experimental channels. Measured values of neutron radiation are three times lower than the relevant levels of gamma radiation. [Serbo-Croat] Na reaktoru RA vrsi se stalna kontrola nivoa gama zracenja po tehnoloskim i radnim prostorijama, pomocu ugradjenog stacionarnog sistema. Svakodnevno se vrse merenja u reaktorskoj hali, prema ukazanim potrebama. Posebno se mere nivoi gamma zracenja u karakteristicnim tackama pri radu reaktora na nominalnoj snazi i u pauzama izmedju dva kampanje. Merenje nivoa neutronskog zracenja vrsi se diskontinualno pomocu mobilnog sfernog neutronskog dozimetra. Merenja se obavljaju u hali oko horizontalnih eksperimentalnih kanala. Izmerene vrednosti su u proseku tri puta manje od odgovarajucih nivoa gama zracenja.

  10. Tendencies in operating power reactors

    International Nuclear Information System (INIS)

    Brinckmann, H.F.

    1987-01-01

    A survey is given about new tendencies in operating power reactors. In order to meet the high demands for control and monitoring of power reactors modern procedures are applicated such as the incore-neutron flux detection by means of electron emission detectors and multi-component activation probes, the noise diagnostics as well as high-efficient automation systems

  11. Modelling of the RA-1 reactor using a Monte Carlo code

    International Nuclear Information System (INIS)

    Quinteiro, Guillermo F.; Calabrese, Carlos R.

    2000-01-01

    It was carried out for the first time, a model of the Argentine RA-1 reactor using the MCNP Monte Carlo code. This model was validated using data for experimental neutron and gamma measurements at different energy ranges and locations. In addition, the resulting fluxes were compared with the data obtained using a 3D diffusion code. (author)

  12. Upgrade of reactor operation technology

    International Nuclear Information System (INIS)

    Itoh, Hideaki; Suzuki, Toshiaki; O-kawa, Toshikatsu

    2003-01-01

    To improve operational reliability and availability, the operation technology for a fast reactor was developed in the ''JOYO''. This report describes the upgrading of the simulator, plant operation management tools and fuel handling system for the MK-III core operation. The simulator was modified to the MK-III version to verify operation manuals, and to train operators in MK-III operation. The plant operation management tool was replaced on the operation experience to increase the reliability and efficiency of plant management works relating to plant operation and maintenance. To shorten the refueling period, the fuel handling system was upgraded to full automatic remote control. (author)

  13. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, L.R.; Hayes, D.W.; Hunter, C.H.; Marter, W.L.; Moyer, R.A.

    1989-12-01

    This volume is a reactor operation environmental information document for the Savannah River Plant. Topics include meteorology, surface hydrology, transport, environmental impacts, and radiation effects. 48 figs., 56 tabs. (KD)

  14. Reactor operations at SAFARI-1

    International Nuclear Information System (INIS)

    Vlok, J.W.H.

    2003-01-01

    A vigorous commercial programme of isotope production and other radiation services has been followed by the SAFARI-1 research reactor over the past ten years - superimposed on the original purpose of the reactor to provide a basic tool for nuclear research, development and education to the country at an institutional level. A combination of the binding nature of the resulting contractual obligations and tighter regulatory control has demanded an equally vigorous programme of upgrading, replacement and renovation of many systems in order to improve the safety and reliability of the reactor. Not least among these changes is the more effective training and deployment of operations personnel that has been necessitated as the operational demands on the reactor evolved from five days per week to twenty four hours per day, seven days per week, with more than 300 days per year at full power. This paper briefly sketches the operational history of SAFARI-1 and then focuses on the training and structuring currently in place to meet the operational needs. There is a detailed step-by-step look at the operator?s career plan and pre-defined milestones. Shift work, especially the shift cycle, has a negative influence on the operator's career path development, especially due to his unavailability for training. Methods utilised to minimise this influence are presented. The increase of responsibilities regarding the operation of the reactor, ancillaries and experimental facilities as the operator progresses with his career are discussed. (author)

  15. Optimization of the neutron calculation model for the RA-6 reactor

    International Nuclear Information System (INIS)

    Coscia, G.A.

    1981-01-01

    A model for the neutronic calculation of the RA-6 reactor which includes the codes ANISN and EQUIPOSE is analyzed. Starting with a brief description of the reactor, the core and its parts, the general scheme of calculation applied is presented. The fuel elements used were those which are utilized in the RA-3 reactor; this is of the MTR type with 90% enriched uranium. With the approximations used, an analysis of such model of calculation was made, trying to optimize it by reducing, if possible, the calculation time without loosing accuracy. In order to improve the calculation model, it is recomended a cross section data library specific for the enrichment of the fuel considered 90% and the incorporation of a more advanced code than EQUIPOISE which would be DIXYBAR. (M.E.L.) [es

  16. Corrosion of aluminium alloy test coupons in water of spent fuel storage pool at RA reactor

    International Nuclear Information System (INIS)

    Pesic, M.; Maksin, T.; Jordanov, G.; Dobrijevic, R.

    2004-12-01

    Study on corrosion of aluminium cladding, of the TVR-S type of enriched uranium spent fuel elements of the research reactor RA in the storage water pool is examined in the framework nr the International Atomic Energy Agency (IAEA) Coordinated Research Project (CRP) 'Corrosion of Research Reactor Clad-Clad Spent Fuel in Water' since 2002. Standard racks with aluminium coupons are exposed to water in the spent fuel pools of the research reactor RA. After predetermined exposure times along with periodic monitoring of the water parameters, the coupons are examined according to the strategy and the protocol supplied by the IAEA. Description of the standard corrosion racks, experimental protocols, test procedures, water quality monitoring and compilation of results of visual examination of corrosion effects are present in this article. (author)

  17. Criticality safety studies involved in actions to improve conditions for storing 'RA' research reactor spent fuel

    International Nuclear Information System (INIS)

    Matausek, M.; Marinkovic, N.

    1998-01-01

    A project has recently been initiated by the VINCA Institute of Nuclear Sciences to improve conditions in the spent fuel storage pool at the 6.5 MW research reactor RA, as well as to consider transferring this spent fuel into a new dry storage facility built for the purpose. Since quantity and contents of fissile material in the spent fuel storage at the RA reactor are such that possibility of criticality accident can not be a priori excluded, according to standards and regulations for handling fissile material outside a reactor, before any action is undertaken subcriticality should be proven under normal, as well as under credible abnormal conditions. To perform this task, comprehensive nuclear criticality safety studies had to be performed. (author)

  18. Neutron spectrometric evaluations in the Argentine research reactor RA-1

    International Nuclear Information System (INIS)

    Kunst, J.J.; Papadopulos, S.B.; Gregori, B.N.; Cruzate, J.A.

    1998-01-01

    Full text: The determination of the quantities dose equivalent H * (10) and personal dose equivalent Hp(10) in mixed field (n,γ) needs the knowledge of the related spectrum. In order to fulfill this aim spectrometer system has been built based on the combination of polyethylene spheres of different diameters (Bonner Spheres System-BSS) and a He 3 proportional counter detector sensitive to thermal neutrons. The detector is located in the geometrical centre of each of the spheres and has an associated electronics with a charge preamplifier, an amplifier and a multichannel system that allows the outgoing spectrum analysis. In order to determine the neutron spectrum a deconvolution method is applied based on the LOUHI82 code. In this work are shown the spectra and the related values of H * (10) that have been got in five places of the reactor and in the command room with the BSS. (author) [es

  19. Neutron spectrometry in mixed fields: characterisation of the Ra-1- reactor workplace

    International Nuclear Information System (INIS)

    Gregori, B.; Carelli, J.; Cruzate, J.; Papadopulos, S.

    2006-01-01

    The characterisation of the neutron spectrum of a workplace is an essential dosimetric tool for improving the assessment of the personal equivalent dose of the workers. In addition, if the operational conditions of the facility are well defined, the set of field spectra obtained may be used as a reference for comparing the performance of different type of neutron detectors. Recently, using a neutron spectrometric system based on a set of moderated spheres with 3 He detector, the characterisation of the neutron spectra in workplaces of the Argentine Reactor No. 1 (R.A. -1) has been carried out. The spectrometric system consists of 12 spheres made of the high density polyethylene d mean δ =0.95 g cm 3 , with diameters between 3'' and 12'' and a proportional counter of 3 He, 4 atm of nominal pressure, Centronic trade mark, located in the centre of the spheres. The neutron response matrix was calculated using the M.C.N.P. -I.V.B. code and E.N.D.F./B-VI library in the energy range between thermal neutron and 100 MeV. The neutron spectrum was unfolded using the M.A.X.E.D. unfolding code. The validation of the spectrometric system was performed at Cea-Cadarache (France) with of 252 Cf, Am Be, and 252 Cf + D 2 O sources. Therefore, in this work, the spectral fluence of the field in the selected points of the facility (R.A.-1) has been presented and the ambient dose equivalent, H *(10), and the personal dose equivalent, Hp(10), have been derived from the neutron fluence, applying ICRP-74 recommended fluence to dose conversion factors. The quantities evaluated have uncertainties less than 15%, which is considered good enough for radiation protection requirements. (authors)

  20. Moderators for the design of a cold neutron source for the RA 3 reactor

    International Nuclear Information System (INIS)

    Cantargi, F; Sbaffoni, M; Granada, R

    2004-01-01

    The cold neutron production of hydrogenous materials was studied, taking into account their radiation resistance, for the conceptual design of a cold neutron source for the RA-3 reactor.Low spontaneous release of chemical energy was found in mesitylene.Libraries for hidrogen in mesitylene were generated using the NJOY nuclear processing system and the resulting cross sections were compared with experimental data.Good agreement between measurements and calculations was found in those cases where data are available.New calculations using the RA-3 geometry and these validated libraries will be performed [es

  1. Design of neutron radiography facility in pool for the reactor RA-10

    International Nuclear Information System (INIS)

    Peirone, M.; Coleff, A.; Sanchez, F.; Chiaraviglio, N.

    2013-01-01

    RA-10 project consists in the design and construction of a multipurpose reactor for multiple applications, including radioisotopes production, material testing and an in pool facility for neutron imaging. Neutron imaging is a powerful tool for studies of materials and offer several advantages among other attenuation-based techniques. In this study mechanical and neutronic requirements for the RA-10 in pool neutron imaging facility are described. The MCNP neutronic model and the mechanical design satisfying these requirements in a first engineering stage are described. (author)

  2. Method for operating nuclear reactor

    International Nuclear Information System (INIS)

    Utamura, Motoaki; Urata, Megumu; Uchida, Shunsuke

    1978-01-01

    Purpose: In order to judge the fuel failures, if any, without opening a reactor container for BWR type reactors, a method has been described for measuring the difference between the temperature dependent iodine spike value and the pressure dependent iodine spike value in the pressure vessel. Method: After the scram of a nuclear reactor, steam generated by decay heat is condensed in a remaining heat exchanger and cooling water is returned through a recycling pipe line to a reactor core. At the same time, a control rod drive system pump is operated, the reactor core is filled with the cooling water. Then, the coolant is taken from the recycling pipe line to cool the reactor core. After applying the temperature fluctuation, the cooling water is sampled at a predetermined time interval at a sampling point to determine the changes with time in the radioactive concentration of iodine. When the radioactivity of iodine in the cooling water is lowered sufficiently by a reactor purifying system, the nuclear reactor vessel is depressurized. After applying pressure fluctuation, iodine spike value is determined. (Kawakami, Y.)

  3. Dosimetry and radiation protection at the RA reactor in 1972; Dozimetrija i zastita kod reaktora RA u 1972. godini

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M M [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1973-07-01

    Dosimetry results collected within radiation protection of the RA reactor during this year are presented. Neutron and gamma radiation data were measured at characteristic control points. Statistical review of the total number of measurement is given as well. The report includes contents of radioactive gasses and aerosols in the air, as well as the contamination data of surfaces, clothes and uncovered body parts of the personnel. Particular accident which occurred during dismantling of the experimental channel containing the capsule with the new fuel element was analysed. This accident occurred at the RA reactor at the beginning of this year. It was found that that the maximum individual external dose was 2.2 R, and that only one individual was exposed to this dose. About 15% of the personnel was exposed to doses between 1 and 2 R, the remaining 85% was exposed to doses less than 1 R. Base on the frequency of activities undertaken in the contaminated regions, safety and control measures and expected internal exposure of the personnel, it was evaluated that the internal exposure could be neglected compared to the external exposure of the personnel. Prikazani su rezultati sakupljani u toku godine u okviru dozimetrijske kontrole i zastite kod reaktora. Dati su podaci o nivoima neutrona i gama zracenja na karakteristicnim kontrolnim mestima, kao i statisticki pregledi ukupnog broja merenja. Navedeni su rezultati merenja sadrzaja radioaktivnih gasova i aerosola u vazduhu, kao i stepena kontaminacije povrsina, odece i otkrivenih delova tela radnog osoblja. Analiziran je specifican akcident koji se odigrao na reaktoru pocetkom godine, pri demontazi eksperimentalnog kanala sa kapsulom novog gorivog elementa. Na kraju, izlozena je analiza ozracivanja radnog osoblja. Konstatovano je da je maksimalna individualna doza spoljasnjeg ozracivanja bila 2,2 (R), i da je ovoj dozi bilo izlozeno samo jedno lice. Oko 15% osoblja bilo je izlozeno dozama izmedju 1 i 2 (R), a ostalih 85

  4. Investigation of corrosion of materials of the irradiation device in the RA reactor

    International Nuclear Information System (INIS)

    Zaric, M.; Mance, A.; Vlajic, M.

    1963-12-01

    Devices for sample irradiation in the vertical RA reactor channels will be made of aluminium alloys. According to the regulations concerned with introducing materials into the RA reactor core, corrosion characterisation of these materials is an obligation. Corrosion properties of four aluminium alloys were investigated both in contact with stainless steel and without it. First part of this report deals with the corrosion testing of aluminium alloys in water by gravimetric and electrochemical methods. Bi-distilled water at temperatures less than 100 deg C was used. Second part is related to aluminium alloys corrosion in carbon dioxide gas under experimental conditions. The second part of research was initiated by the design of the head of the independent CO 2 loop for samples cooling [sr

  5. Thermohydraulic calculations in rectangular channels for RA-6 type reactors with transition regime

    International Nuclear Information System (INIS)

    Sillin, N; Vertullo, A.; Masson, V.; Hilal, R

    2009-01-01

    In August 2000 and within the framework of the RA-6 core conversion from high to low enrichment (20%), a preliminary analysis was performed to evaluate the maximum power that the reactor could operate with the new kernel without makeing substantial changes. This meant keeping intact, for example, the concrete shield of the pool and the nucleus inlet and outlet pipes embedded in the walls. Preliminary results indicated that for these boundary conditions a maximum power of about 3 MWt could be achieved. In August 2005 the project was resumed and new calculations performed taking as a starting point the ECBE plate fuel element(U3O8-Al). A core was developed with cooling channle widths of 2.6 mm for the control fuel elements and 2.7 mm for standard fuel elements. The thermo-hydraulic calculation puts in evidence that coolant flow into the core was in the transitional regime for the vast majority of configurations. While TERMIC code, used for thermo-hydraulic design, has been extensively tested and validated for use in research reactors under turbulent and laminar flows, this is not so for transition conditions. The transition regime is strongly dependent on conditions such as flow inlet characteristics, channel geometry, etc.. and therefore there are no reliable correlations for general use. For this reason we found it convenient to carry out experiments simulating the working conditions in order to adjust the code results with experimental data. In the present work we show the experimental results, the simulation of the experiences using the TERMIC code, and the adjustments made to the correlations used by the code so that it can be applied to the thermo-hydraulic design of the new core. [es

  6. The qualification of reactor operators

    International Nuclear Information System (INIS)

    Lima, J.M. de; Soares, H.V.

    1981-01-01

    The qualification and performance of nuclear power personnel have an important influence on the availability and safety operation of these plants. This paper describes the Brazilian rules and norms established by the CNEN-Brazilian Atomic Energy Comission, as well as policy of other countries concerning training requirements and experiences of nuclear power reactor operators. Some coments are made about the im pact of the march 1979 Three Mile Island accident on upgrading the reactor training requirements in U.S.A. and its international implication. (Author) [pt

  7. A database model for the radiological characterization of the RA reactor in the 'Vinca' Institute

    International Nuclear Information System (INIS)

    Steljic, M.; Ljubenov, V.

    2004-01-01

    During the preparation and realization of the radiological characterization of nuclear facility it is necessary to organize, store, review and process large amount of various data types. The documentation has to be treated according to the quality assurance (QA) programme requirements, and to ultimate goal would be to establish the unique record management system (RMS) for the nuclear facility decommissioning project. This paper presents the design details of the database model for the radiological characterization of the RA research reactor (author) [sr

  8. New experimental space for irradiating samples by RA reactor fast neutron flux at temperatures up to 100 deg C; Novi eksperimentalni prostori namenjeni ozracivanju uzoraka u fluksu brzih neutrona na temperaturama do 100{sup 0} C na reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M; Novakovic, M; Zecevic, V [Boris Kidric Institute of nuclear sciences, Vinca, Belgrade (Yugoslavia)

    1961-07-01

    The objective of this paper is to present adaptation of the RA reactor which would enable samples irradiation by fast neutrons and describe new experimental possibilities. New experimental space was achieved using hollow fuel elements which have been reconstructed to enable placement of irradiation capsules inside the tube. This paper includes thermal analysis and describes problems related to operation, safety and radiation protection issues which arise from using reconstructed fuel elements.

  9. The design of a fuel element for the RA-3 reactor (Ezeiza Atomic Center)

    International Nuclear Information System (INIS)

    Agueda, Horacio C.; Estevez, Esteban; Gerding, Jose R.; Markiewicz, Mario E.

    2003-01-01

    Some features of the mechanical design of the low enrichment fuel element for the RA-3 reactor are described, with emphasis in those aspects of the original design that have been modified considering the experience acquired in the design of other fuel elements. The proposed modification is based fundamentally on the replacement of all welded joints by screwed joints, which facilitates the manufacture of the fuel element, avoiding the distortions produced by the welds used at present and contributing to the fulfillment of the foreseen tolerances. A basic characteristic of this design is a careful manufacture of the fuel element's structural components in order to assure an assembling of the fuel element that fulfills the tolerances intrinsically required. The fuel is designed for the RA-3 reactor and uses U 3 O 8 or U 3 Si 2 as carrying phase of the fissile material with an enrichment of 19.70% of 235 U. The design verification was performed by analytical and numerical methods, and is supported by testing of materials in laboratory, hydrodynamics tests and performance evaluations of the fuel elements in the RA-3 reactor. (author)

  10. Research nuclear reactor RA - Annual Report 1995, with comparative review for period 1991-1995; Istrazivacki nuklearni reaktor RA - Izvestaj za 1995. godinu, uz uporedni pregled za period 1991-1995

    Energy Technology Data Exchange (ETDEWEB)

    Sotic, O [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1995-12-01

    Activities related to revitalisation of the RA reactor started in 1986, were continued during period 1991-1995. All the planned actions related to renewal of the reactor components were finished. The last, and at the same time most important action, related to exchange of complete reactor instrumentation is underway, delayed. The delivery of components from USSR is late. Production of this instruments is financed by the IAEA according to the contract signed in December 1988 with Russian Atomenergoexport. According to this contract, it has been planned that the RA reactor instrumentation should be delivered to the Vinca Institute by the end of 1990. Only 56% of the instrumentation was delivered until September 1991. Since then any delivery of components to Yugoslavia was stopped because of the temporary embargo imposed by the IAEA. The existing RA reactor instrumentation was dismantled. Control and maintenance of the reactor components was done regularly and efficiently. Fuel inspection by the IAEA safeguards inspectors was done on a monthly basis. There have been on the average 47 employees at the RA reactor which is considered sufficient for maintenance and repair conditions. The problem of financing the reactor activities and maintenance remains unsolved during the period 1991-1995. This research reactor RA Annual is divided into two main parts to cover: (1) operation and maintenance and (2) activities related to radiation protection. [Serbo-Croat] U periodu 1991-1995. godina nastavljeni su poslovi na revitalizaciji reaktora RA, zapocetoj 1986. godine. Okoncan je niz zahvata na opremi postrojenja kojima ce se u narednom periodu omoguciti kontinualan i pouzdan rad ovog reaktora. Poslednji, i ujedno najveci zahvat, koji se odnosi na zamenu celokupne instrumentacije kasni zbog zastoja u isporuci opreme koja se izradjuje u Sovjetskom savezu. Izradu ove opreme finansira Medjunarodna agencija za atomsku energiju kroz ugovor sklopljen decembra 1988. godine sa moskovskom

  11. Research nuclear reactor operation management

    International Nuclear Information System (INIS)

    Preda, M.; Carabulea, A.

    2008-01-01

    Some aspects of reactor operation management are highlighted. The main mission of the operational staff at a testing reactor is to operate it safely and efficiently, to ensure proper conditions for different research programs implying the use of the reactor. For reaching this aim, there were settled down operating plans for every objective, and procedure and working instructions for staff training were established, both for the start-up and for the safe operation of the reactor. Damages during operation or special situations which can arise, at stop, start-up, maintenance procedures were thoroughly considered. While the technical skill is considered to be the most important quality of the staff, the organising capacity is a must in the operation of any nuclear facility. Staff training aims at gaining both theoretical and practical experience based on standards about staff quality at each work level. 'Plow' sheet has to be carefully done, setting clear the decision responsibility for each person so that everyone's own technical level to be coupled to the problems which implies his responsibility. Possible events which may arise in operation, e.g., criticality, irradiation, contamination, and which do not arise in other fields, have to be carefully studied. One stresses that the management based on technical and scientific arguments have to cover through technical, economical and nuclear safety requirements a series of interlinked subprograms. Every such subprograms is subject to some peculiar demands by the help of which the entire activity field is coordinated. Hence for any subprogram there are established the objectives to be achieved, the applicable regulations, well-defined responsibilities, training of the personnel involved, the material and documentation basis required and activity planning. The following up of positive or negative responses generated by experiments and the information synthesis close the management scope. Important management aspects

  12. Annex 1 - Task 08/12 final report, testing the RA reactor fuel element; Prilog 1 - Zavrsni izvestaj o podzadatku 08/12, Ispitivanje gorivnog elementa reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Mihajlovic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Testing of the RA reactor fuel element is presented in Annex 2 and 3 of this report. Annex 2 describes the construction of individual parts of the fuel elements and the results of the chemical analyses. Annex 3 shows the microstructure of uranium in the fuel element.

  13. Reactor Operations informal monthly report December 1994

    International Nuclear Information System (INIS)

    1994-12-01

    Reactor operations at the MRR and HFBR reactors at Brookhaven National Laboratory are presented for December 1994. Reactor run-time and power levels, instrumentation, mechanical maintenance, occurrence reports, and safety information are included

  14. Radiation dosimetry of the reactor RA at Vinca, Measurements by isothermal calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Radak, B; Markovic, V; Draganic, I [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    1. In this work we have made attempts to: - analyze the problems of reactor radiation dosimetry; - describe the solutions of this problem by the calorimetric method; - present our results of measurements of the reactor RA at Vinca, and to describe the method, apparatus and measuring equipment used. 2. Use was made of the isothermal calorimeter with thermistors which measured the absorbed dose rates within the range 10{sup 4}-10{sup 6} rad/h, with an accuracy of 2-5%. It was shown that the reactor radiation in which the thermal neutron flux is up to the order of magnitude 10{sup 12} n/cm{sup 2}/sec, and the integral thermal neutron flux up to about 10{sup 16} n/cm{sup 2} exerts no significant influence upon the working characteristics out of the thermistors used. 3. Determination was made of the absorbed dose distribution into the gamma-ray and the neutron contribution. For this purpose we used 3 materials: ordinary water, heavy water and graphite. 4. Measurements were carried out in two vertical experimental holes 'VK-5' and 'VK-6' of the reactor RA at several heights. It has been shown that the absorbed dose height distribution agrees well with the thermal flux distribution curve, although the relations of the absorbed doses of the two holes are not in accordance with the corresponding thermal flux relations (author)

  15. Radiation dosimetry of the reactor RA at Vinca, Measurements by isothermal calorimeter

    Energy Technology Data Exchange (ETDEWEB)

    Radak, B; Markovic, V; Draganic, I [Institute of Nuclear Sciences Boris Kidric, Department of radiation chemistry, Vinca, Beograd (Serbia and Montenegro)

    1961-10-15

    In this work we have made attempts to: analyze the problems of reactor radiation dosimetry; describe the solution of this problem by the calorimetric method; present our results of measurements on the reactor RA at Vinca, and to describe the method, apparatus and measuring equipment used. Use was made of the isothermal calorimeter with thermistors which measured the absorbed dose rates within the range 10{sup 4}-10{sup 6} rad/h, with an accuracy of 2-5%. It was shown that the reactor radiation in which the thermal neutron flux is up to the order of magnitude 10{sup 12} n/cm{sup 2}/sec, and the integral thermal neutron flux up to about 10{sup 16} n/cm{sup 2} exerts no significant influence upon the working characteristics of the thermistors used. Determination was made of the absorbed dose distribution into the gamma-ray and the neutron contribution. For this purpose we used 3 materials: ordinary water, heavy water and graphite. Measurements were carried out in two vertical experimental holes 'VK-5' and 'VK-9' of the reactor RA at several heights. It has been shown that the absorbed dose height distribution agrees well with the thermal flux distribution curve, although the relations of the absorbed doses of the two holes are not in accordance with the corresponding thermal flux relations (author)

  16. Radiation dosimetry of the reactor RA at Vinca, Measurements by isothermal calorimeter

    International Nuclear Information System (INIS)

    Radak, B.; Markovic, V.; Draganic, I.

    1961-01-01

    1. In this work we have made attempts to: - analyze the problems of reactor radiation dosimetry; - describe the solutions of this problem by the calorimetric method; - present our results of measurements of the reactor RA at Vinca, and to describe the method, apparatus and measuring equipment used. 2. Use was made of the isothermal calorimeter with thermistors which measured the absorbed dose rates within the range 10 4 -10 6 rad/h, with an accuracy of 2-5%. It was shown that the reactor radiation in which the thermal neutron flux is up to the order of magnitude 10 12 n/cm 2 /sec, and the integral thermal neutron flux up to about 10 16 n/cm 2 exerts no significant influence upon the working characteristics out of the thermistors used. 3. Determination was made of the absorbed dose distribution into the gamma-ray and the neutron contribution. For this purpose we used 3 materials: ordinary water, heavy water and graphite. 4. Measurements were carried out in two vertical experimental holes 'VK-5' and 'VK-6' of the reactor RA at several heights. It has been shown that the absorbed dose height distribution agrees well with the thermal flux distribution curve, although the relations of the absorbed doses of the two holes are not in accordance with the corresponding thermal flux relations (author)

  17. Radiation dosimetry of the reactor RA at Vinca, Measurements by isothermal calorimeter

    International Nuclear Information System (INIS)

    Radak, B.; Markovic, V.; Draganic, I.

    1961-01-01

    In this work we have made attempts to: analyze the problems of reactor radiation dosimetry; describe the solution of this problem by the calorimetric method; present our results of measurements on the reactor RA at Vinca, and to describe the method, apparatus and measuring equipment used. Use was made of the isothermal calorimeter with thermistors which measured the absorbed dose rates within the range 10 4 -10 6 rad/h, with an accuracy of 2-5%. It was shown that the reactor radiation in which the thermal neutron flux is up to the order of magnitude 10 12 n/cm 2 /sec, and the integral thermal neutron flux up to about 10 16 n/cm 2 exerts no significant influence upon the working characteristics of the thermistors used. Determination was made of the absorbed dose distribution into the gamma-ray and the neutron contribution. For this purpose we used 3 materials: ordinary water, heavy water and graphite. Measurements were carried out in two vertical experimental holes 'VK-5' and 'VK-9' of the reactor RA at several heights. It has been shown that the absorbed dose height distribution agrees well with the thermal flux distribution curve, although the relations of the absorbed doses of the two holes are not in accordance with the corresponding thermal flux relations (author)

  18. The analysis of the RA reactor irradiated fuel cooling in the spent fuel pool; Analiza hladjenja ozracenog goriva u bazenu za odlaganje reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Vrhovac, M; Afgan, N; Spasojevic, D; Jovic, V [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1985-07-01

    According to the RA reactor exploitation plan the great quantity of the irradiated spent fuel will be disposed in the reactor spent fuel pool after each reactor campaign which will including the present spent fuel inventory increase the residual power level in the pool and will soon cause the pool capacity shortage. To enable the analysis of the irradiated fuel cooling the pool and characteristic spent fuel canister temperature distribution at the residual power maximum was done. The results obtained under the various spent fuel cooling conditions in the pit indicate the normal spent fuel thermal load even in the most inconvenient cooling conditions. (author)

  19. Feasibility of ISO 14000 certification for the RA-6 reactor of the Bariloche Atomic Center

    International Nuclear Information System (INIS)

    Gho, Carlos J.

    2003-01-01

    The strengths and weaknesses of a proposal to set up a System for the Environmental Management of RA-6 reactor are reviewed. With this aim: The facility, its surroundings, its institutional frame, and the links of both the National Atomic Energy Commission and the Bariloche Atomic Center with the environmental issues are described. The RA-6 past and present regarding the environment is analyzed. The existence of an abundant documentation on procedures and manuals for administrative and technical management, as well as records of environmental behavior is determined. A summary is made of the work done with the staff in order to assess their motivation to develop this type of initiative, and their degree of knowledge and awareness of environmental issues. It is worthy to point out the high professional training of the RA-6 staff. This information is analyzed under the point of view of ISO 14001 both text and philosophy. It is shown that there exist important strengths that enable to face a concrete project, and that the weaknesses are few, most of them can be overcome somehow easily. The opportunity is remarkable. Conclusion is made that RA-6 is not only in optimal conditions to face successfully the implementation of an Environmental Management System, but it has already a rudimentary one

  20. RA-6 reactor's probabilistic safety evaluation. Identification and selection of starting events

    International Nuclear Information System (INIS)

    Kay, J.; Chiossi, C.; Felizia, E.; Vallerga, H.; Kalejman, G.; Navarro, R.; Caruso, G.J.

    1987-01-01

    A summary of the 'Identification and selection of starting events' stage of the previous probabilistic safety evaluation of RA-6 reactor is presented. This evaluation was performed to verify if the safety criteria required for the licensing of RA-6 are met and to promote the diffusion of its meaning and usefulness with educational purposes. At this stage the starting events of RA-6 are determined and the probability that such events occur is calculated. The identification and selection of starting events is performed in two steps: determination of proposed starting events and determination of postulated starting events. The proposed starting events are determined by means of the master logic diagram (MLD) method, while the postulated starting events are obtained by grouping the proposed starting events. The simplifying hypothesis required for the application of MLD to the reactor are also formulated. The probability that the proposed and postulated starting events occur is afterwards calculated, adopting different fault models, in accordance with the nature of events that are considered. Conservative hypothesis on the characteristics of these events and the uncertainty of parameter values of those models are also formulated. The numerical values of the above mentioned probabilities are obtained by giving the parameters suitable values that are extracted from specialized publications. (Author)

  1. Practical experience for liquid radioactive waste treatment from spent fuel storage pool on RA reactor in Vinca Institute

    International Nuclear Information System (INIS)

    Plecas, I.; Pavlovic, R.; Pavlovic, S.

    2002-01-01

    The present paper reports the results of the preliminary removal of sludge from the bottom of the spent fuel storage pool in the RA reactor, mechanical filtration of the pool water and sludge conditioning and storage. Yugoslavia is a country without a nuclear power plant (NPP) on its territory. The law which strictly forbids NPP construction is still valid, but, nevertheless we must handle and dispose radioactive waste. This is not only because of radwaste originating from the use of radioactive materials in medicine and industry, but also because of the waste generated by research in the Nuclear Sciences Institute Vinca. In the last forty years, in the Vinca Institute, as a result of two research reactors being operational, named RA and RB, and as a result of the application of radionuclides in medicine, industry and agriculture, radioactive waste materials of different levels of specific activity were generated. As a temporary solution, radioactive waste materials are stored in two interim storages. Radwaste materials that were immobilized in the inactive matrices are to be placed in concrete containers, for further manipulation and disposal.(author)

  2. Application of the neutron noise technique for measurement of reactivity for subcritical reactor RA-4

    International Nuclear Information System (INIS)

    Orso, J; Marenzana, A

    2012-01-01

    Reactor core RA-4 is divided into two parts that come together to start reactor. The reactor with core separate has the largest subcritical condition, this condition is more secure and therefore the reactor shutdown. In this paper measurements are made of the decay constant of the neutron prompt ' P ', using the α-Rossi and α-Feynman methods to calculate the reactivity of the reactor core for different positions. Both techniques are compared and reactivity is obtained for several position of the reactor core using the α-Rossi technical which is obtained a function that gives the reactivity depending on the separation of the core length. Both techniques are verified using a no multiplicative system. Reactivity values for different position of the core obtained by α-Rossi technique are: $[0 cm] = (-11+/-1) dollar, $[3 cm] = (-7+/-1) dollar, $[3.5 cm] (-5.5+/-0.8) dollar, $[4.2 cm] = (-3.8+/-0.3) dollar y $[4.5] = (-3.0+/-0.1) dollar (author)

  3. Operational power reactor health physics

    International Nuclear Information System (INIS)

    Watson, B.A.

    1987-01-01

    Operational Health Physics can be comprised of a multitude of organizations, both corporate and at the plant sites. The following discussion centers around Baltimore Gas and Electric's (BG and E) Calvert Cliffs Nuclear Power Plant, located in Lusby, Maryland. Calvert Cliffs is a twin Combustion Engineering 825 MWe pressurized water reactor site with Unit I having a General electric turbine-generator and Unit II having a Westinghouse turbine-generator. Having just completed each Unit's ten-year Inservice Inspection and Refueling Outge, a total of 20 reactor years operating health physics experience have been accumulated at Calvert Cliffs. Because BG and E has only one nuclear site most health physics functions are performed at the plant site. This is also true for the other BG and E nuclear related organizations, such as Engineering and Quality Assurance. Utilities with multiple plant sites have corporate health physics entity usually providing oversight to the various plant programs

  4. Reactor operator screening test experiences

    International Nuclear Information System (INIS)

    O'Brien, W.J.; Penkala, J.L.; Witzig, W.F.

    1976-01-01

    When it became apparent to Duquesne Light Company of Pittsburgh, Pennsylvania, that the throughput of their candidate selection-Phase I training-reactor operator certification sequence was something short of acceptable, the utility decided to ask consultants to make recommendations with respect to candidate selection procedures. The recommendation implemented was to create a Nuclear Training Test that would predict the success of a candidate in completing Phase I training and subsequently qualify for reactor operator certification. The mechanics involved in developing and calibrating the Nuclear Training Test are described. An arbitration decision that resulted when a number of International Brotherhood of Electrical Workers union employees filed a grievance alleging that the selection examination was unfair, invalid, not job related, inappropriate, and discriminatorily evaluated is also discussed. The arbitration decision favored the use of the Nuclear Training Test

  5. Health requirements for nuclear reactor operators

    International Nuclear Information System (INIS)

    1980-05-01

    The health prerequisites established for the qualification of nuclear reactor operators according to CNEN-NE-1.01 Guidelines Licensing of nuclear reactor operators, CNEN-12/79 Resolution, are described. (M.A.) [pt

  6. Nuclear Reactor RA Safety Report, Vol. 15, Analysis of significant accidents; Izvestaj o sigurnosti nuklearnog reaktora RA, Knjiga 15, Analiza znacajnih akcidenata

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1986-11-01

    Power excursions of the RA reactor a mathematical model of reactor kinetic behaviour was formulated to describe power and temperature coefficients for both reactor fuel and moderator. Computer code TM-1 was written for analysis of possible reactor accidents. Power excursions caused by uncontrolled control rod removal and heavy water flow into the central vertical experimental channel were analyzed. Accidents caused by fuel elements handling were discussed including possible fuel element damage. Although the probability for uncontrolled radioactive materials release into the environment is very low, this type of accidents are analyzed as well including the impact on the personnel and the environment. A separate chapter describes analysis of the loss of flow accident. Safety analysis covers the possible damage of the outer steel Ra reactor vessel and the water screens which are part of the water biological shield. [Serbo-Croat] Radi analize dinamickog ponasanja reaktora RA u toku ekskurzije snage formulisan je matematicki model koji opisuje promene snage i temperature goriva i moderatora. Za analizu predpostavljenih akcidenata realizovan je racunarski program TM-1. Analizirane su ekskurzije snage usled nekontrolisanog izvlacenja kontrolnih sipki i punjenja centralnog vertikalnog eksperimentalnog kanala teskom vodom. Analizirani su akcidenti pri rukovanju nuklearnim gorivom ukljucujuci ostecenje nuklearnog goriva. Iako je verovatnoca za nekontrolisano rasturanje radioaktivnog materijala mala, analizirani su i ovakvi moguci akcidenti koji mogu uticati kako na osoblje reaktora tako i na okolinu. Posebno poglavlje obuhvata analizu akcidenta u slucaju prestanka cirkulacije primarnog hladioca. Analiza sigurnosti reaktora obuhvata i moguce ostecenje spoljasnjeg celicnog suda reaktora RA kao i vodenih ekrana koji su deo vodenog bioloskog stita.

  7. Method of safely operating nuclear reactor

    International Nuclear Information System (INIS)

    Ochiai, Kanehiro.

    1976-01-01

    Purpose: To provide a method of safely operating an nuclear reactor, comprising supporting a load applied to a reactor container partly with secondary container facilities thereby reducing the load borne by the reactor container when water is injected into the core to submerge the core in an emergency. Method: In a reactor emergency, water is injected into the reactor core thereby to submerge the core. Further, water is injected into a gap between the reactor container and the secondary container facilities. By the injection of water into the gap between the reactor container and the secondary container facilities a large apparent mass is applied to the reactor container, as a result of which the reactor container undergoes the same vibration as that of the secondary container facilities. Therefore, the load borne by the reactor container itself is reduced and stress at the bottom part of the reactor container is released. This permits the reactor to be operated more safely. (Moriyama, K.)

  8. Reactor modification, preparation and operation

    International Nuclear Information System (INIS)

    Weill, J.; Furet, J.; Baillet, J.; Donvez, G.; Duchene, J.; Gras, R.; Mercier, R.; Chenouard, J.; Leconte, J.

    1962-01-01

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system

  9. Reactor modification, preparation and operation

    Energy Technology Data Exchange (ETDEWEB)

    Weill, J; Furet, J; Baillet, J; Donvez, G; Duchene, J; Gras, R; Mercier, R [Electronics Dept., Independent Section of Reactor Electronics, Saclay (France); Chenouard, J; Leconte, J [Dept. of Physical Chemistry, Stable Isotopes Section, Saclay (France)

    1962-03-15

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system.

  10. Reactor modification, preparation and operation

    Energy Technology Data Exchange (ETDEWEB)

    Weill, J; Furet, J; Baillet, J; Donvez, G; Duchene, J; Gras, R; Mercier, R [Electronics Dept., Independent Section of Reactor Electronics, Saclay (France); Chenouard, J; Leconte, J [Dept. of Physical Chemistry, Stable Isotopes Section, Saclay (France)

    1962-03-01

    In the course of preparations for the dosimetry experiment at the R-B reactor the control and safety equipment of the reactor was found to be inadequate for operation at a constant power level of several watts. After completing the study of control and safety issues by CEA, safety and control were defined for the purpose of the Joint Dosimetry Experiment. Preparations for the Dosimetry Experiment included: installation of equipment for control and safety of the reactor; supplying 6570 Kg of heavy water by UK, reinforcement of the reactor wall on the outside of the building; constructing the protection of the control room; start-up, measuring of the critical heavy water level, and check of control and safety rods worth. After the final check of safety rod mechanisms, eight runs were performed at a power of 5 Watt, and then a 1 k Watt run was carried out and the power stabilized at this power for 30 min by automatic control system.

  11. Data about operation and utilization of the RA in 1976 - Report, Annex I; Prilog I - Podaci o radu i iskoriscenosti reaktora RA u 1976. godini - Izvestaj -

    Energy Technology Data Exchange (ETDEWEB)

    Stanic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1976-12-15

    During 1976 there were significant discrepancies in RA reactor operation in comparison with the operating plan made at the end of 1975. Some discrepancies were planned but not all could be foreseen due to the following reasons: no possibility to estimate the precise schedule of aluminium tubes for fuel channels delivery from the; USSR; no means to estimate precise time for repairs that were never performed or were not done during previous 6 years; inability to estimate the time needed for experiments within the program of transfer to highly enriched fuel (which was successfully finished) since some of these experiments were never done before. Some repairs were not planned since unpredicted failures occurred. Six fuel exchanges were planned, but they were somewhat delayed. Detailed data about the planned and achieved reactor operation are shown in this annex as well as interruptions. There were 12 shorter interruptions and safety shutdowns which was in total for 64 hours. Reactor was operated at nominal power of 6.5 MW. There have been no significant accidents, but two cases could be characterised as accidental according to their occurrence not according to the effects. The first was break of the tube next to the heavy water pump, and the second was contamination of the reactor hall and corridor during preparation of the fuel exchange machine (spill of heavy water). This annex covers the data concerned with utilization of experimental facilities and reactor utilization. [Serbo-Croat] Reaktor RA je u toku 1976. godine radio sa znatnijim odstupanjima od plana rada za 1976. godinu, donetom krajem 1975. godine. Medjutim, ni ova procena mogucih odstupanja nije mogla biti korektna iz sledecih, razloga: nemogucnost da se predvidi tacan rok isporuke cevi od specijalne aluminijumske legure iz SSSR za izradu tehnoloskih kanala, nemogucnost da se predvidi tacno vreme potrebno za remonte kakvi ili nisu radjeni ranije ili su radjeni pre vise od 6 godina pod povoljnijim uslovima

  12. Continuous Monitoring of GAMMA Radiation Field in the Reactor RA Building

    International Nuclear Information System (INIS)

    Stalevski, T.

    2008-01-01

    This paper presents the system for continuos monitoring of gamma doze rate in the reactor RA building. Industrial (PC compatible) computer acquires analog signals from eight ionization chambers and eight analog signals from three BPH devices. Digital output interface is used for testing ionization chambers and BPH devices. Computer program for data analyzes and presentation is written in graphical programming language LabVIEW and enables monitoring of measured data in real time. Measured data can be monitored over local computer network, Internet and mobile devices using standard web browsers. (author)

  13. Calculation of the flow distribution for the new core of the RA-6 reactor

    International Nuclear Information System (INIS)

    Garcia, J.C.; Delmastro, Dario F.

    2007-01-01

    In this work the pressure drop, the flow distribution, effective cooling flow rate and the velocity in the subchannels that cool fuel plates for the new core of RA-6 research reactor were calculated. These calculations were performed for a flow of 340 m 3 /hr and water temperatures of 12 C degrees, of 35 C degrees and 42 C degrees. The flow distribution was calculated without considering either safety factors or geometric changes. All the calculations were performed considering the flow as isothermal. (author) [es

  14. Absolute measurements of the fast neutron flux in the reactor RA

    Energy Technology Data Exchange (ETDEWEB)

    Berovic, N; Boreli, F; Dragin, R [Institute of Nuclear Sciences Boris Kidric, Department of physics, Vinca, Beograd (Serbia and Montenegro)

    1961-10-15

    The absolute neutron flux in the vertical VK-5 hole of the reactor RA was determined by using the {sup 27}Al (n, alpha) {sup 24}Na reaction, and by counting the {sup 24}Na - 2.5 MeV gamma line photopeak activity. A method for the determination of {sigma}{sub eff} as a mean value between the two large limiting cases of neutron spectra is used. The flux at the power level of 5 MW was found to be (2.5{+-}0.9){center_dot}10{sup 12}n/cm{sup 2}sec (author)

  15. Simple computational modeling for human extracorporeal irradiation using the BNCT facility of the RA-3 Reactor

    International Nuclear Information System (INIS)

    Farias, Ruben; Gonzalez, S.J.; Bellino, A.; Sztenjberg, M.; Pinto, J.; Thorp, Silvia I.; Gadan, M.; Pozzi, Emiliano; Schwint, Amanda E.; Heber, Elisa M.; Trivillin, V.A.; Zarza, Leandro G.; Estryk, Guillermo; Miller, M.; Bortolussi, S.; Soto, M.S.; Nigg, D.W.

    2009-01-01

    We present a simple computational model of the reactor RA-3 developed using Monte Carlo transport code MCNP. The model parameters are adjusted in order to reproduce experimental measured points in air and the source validation is performed in an acrylic phantom. Performance analysis is carried out using computational models of animal extracorporeal irradiation in liver and lung. Analysis is also performed inside a neutron shielded receptacle use for the irradiation of rats with a model of hepatic metastases.The computational model reproduces the experimental behavior in all the analyzed cases with a maximum difference of 10 percent. (author)

  16. Determination of the neutron spectrum at different locations in the Argentine RA-1 Reactor; Determinacion del espectro neutronico en distintas posiciones del reactor RA-1

    Energy Technology Data Exchange (ETDEWEB)

    Lerner, A M; Madariaga, M R [Autoridad Regulatoria Nuclear, Buenos Aires (Argentina)

    1999-12-31

    Full text: It is well known that the RA-1 reactor is used to irradiate different types of materials with neutrons. The Radio dosimetry Group (which belongs to the Nuclear Regulatory Authority) uses its fast column for the design, calibration and set up of criticality dosimeters as well as for a quick assessment of the dose to workers in case of an accident. With such purpose, Au(1), Au under Cd and In(2) foils were irradiated to estimate absolute thermal, epithermal and fast neutron fluxes at the irradiation location. The accuracy of this estimation is higher when the response to the present neutron spectrum of the different materials constituting the detectors is better known. This, in turn, requires the previous knowledge of such spectrum (a detailed energy dependence of neutron flux) at the analysed location. In this work a neutronic calculation is presented at the fast irradiation location. The whole calculation was carried out following two different methodologies, and considering a power of 40 kW. The reactor and its surroundings were represented by a simplified one-dimensional model, as a concentric cylindrical set of regions. Figures are drawn representing fast and thermal fluxes (with the cut at 0.4 eV) as a function of the distance to the core centre. The neutron flux (in n/cm{sup 2}sec.eV) as a function of energy is also shown at the fast irradiation location. Values of flux (in n/cm{sup 2}.sec.eV) are also provided as a function of energy in other typical locations, as well as the equivalent integrated flux values (in n/cm{sup 2}.sec). ((1) According to the reaction Au{sup 197}(n,{gamma})Au{sup 198}, having a cross section of {sigma}{sub 0}=98.8b for thermal neutrons. (2) According to the reaction In{sup 115}(n,n`)In{sup 115m}, with a cross section of some 70 mb for neutrons with energies above 1.2MeV). (author) [Espanol] Texto completo: Como se sabe, el reactor RA1 se utiliza para irradiar con neutrones distintos tipos de materiales. El grupo de

  17. Investigation of corrosion of materials of the irradiation device in the RA reactor; Ispitivanje korozije materijala uredjaja za ozracivanje na reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    Zaric, M; Mance, A; Vlajic, M [Institute of Nuclear Sciences Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    Devices for sample irradiation in the vertical RA reactor channels will be made of aluminium alloys. According to the regulations concerned with introducing materials into the RA reactor core, corrosion characterisation of these materials is an obligation. Corrosion properties of four aluminium alloys were investigated both in contact with stainless steel and without it. First part of this report deals with the corrosion testing of aluminium alloys in water by gravimetric and electrochemical methods. Bi-distilled water at temperatures less than 100 deg C was used. Second part is related to aluminium alloys corrosion in carbon dioxide gas under experimental conditions. The second part of research was initiated by the design of the head of the independent CO{sub 2} loop for samples cooling. [Serbo-Croat] Uredjaji za ozracivanje u vertikalnim kanalima reaktora RA, bice napravljeni od legura aluminjuma. Prema propisima o unosenju materijala u RA reaktor materijali se moraju prethodno ispitati i sa stanovista korozije. Ispitivane su korozione pojave na cetiri aluminjumske legure sa i bez kontakta sa nerdjajucim celikom. Prvi deo ovog rada tretira pitanje korozije legura aluminijuma u vodi gravimetrijskim i elektrohemijskim metodama. Koriscena je bidestilovana voda na temperaturi do 100 deg C. Drugi deo se odnosi na ispitivanje ponasanja legura aluminijuma u gasovitom ugljen dioksidu pod uslovima eksperimenta. Drugi deo istrazivanja izvrsen je za potrebe izgradnje glave petlje nezavisnog kola za hladjenje uzoraka gasovitim CO{sub 2}.

  18. Preparation of mandatory documentation before the start up of the RA-0 `zero power` nuclear reactor at Cordoba National University; Preparacion de la documentacion mandatoria para la puesta en marcha del reactor nuclear RA-0 en la Universidad Nacional de Cordoba

    Energy Technology Data Exchange (ETDEWEB)

    Martin, H R; Keil, W M; Pezzi, N

    1992-12-31

    Before the start up of the RA-0 `zero power` nuclear reactor installed at Cordoba National University, it was necessary to send to the Regulatory Authority the mandatory documentation which is required in the licensing process. With the previous papers existing for the operation in the first years of the `70, a work program for the future operational training personnel was elaborated. Based on the Authority`s applicable rules and the recommendations and with particular criteria originated in the working university conditions, the SAFETY report of RA-0 nuclear reactor was prepared. This paper describes the principal contents, items and documents involved in the safety report. (Author). [Espanol] Con motivo de la nueva puesta en servicio del REACTOR NUCLEAR RA-0 fue necesario elaborar la documentacion mandatoria requerida por la Autoridad Regulatoria Nacional. Siguiendo los lineamientos de las normas y recomendaciones vigentes e incluyendo criterios propios en lo que debia ser el contenido final de dicha documentacion, fue preparado lo que se ha denominado el INFORME DE SEGURIDAD DEL REACTOR NUCLEAR RA-0. Este documento que se describe en este trabajo, si bien contiene las habituales descripciones de todos los Informes de Seguridad, incluye otros aspectos que no siendo requeridos expresamente en el mismo, han dado una mayor coherencia a la conformacion de todos los aspectos que interrelacionan las areas de seguridad fisica, radiologica, nuclear y de control de materiales nucleares bajo salvaguardias. (Autor).

  19. Corrosion of aluminium-clad spent fuel at RA research reactor

    International Nuclear Information System (INIS)

    Pesic, M.; Maksin, T.; Dobrijevic, R.; Idjakovic, Z.

    2003-01-01

    Almost 95% of all spent fuel elements of the RA research reactor in the Vinca Institute of Nuclear Sciences, Belgrade, Serbia and Montenegro, are stored in 30 aluminium barrels and about 300 stainless steel channel-holders in the temporary spent fuel storage water pool. The first activities of sludge and water samples, taken from the pool, were measured in 1996-1997 and were followed by analysis of chemical composition of samples. Visual inspections of fuel elements in some stainless steel tubes and of the fuel channels stored in the reactor core have shown that some deposits cover aluminium cladding. Stains and surface discoloration are noted on many of the spent fuel elements that were examined visually during the core unloading and inspections carried out in 1979 - 1984. Some of water samples, taken from pool, about a 150 stainless steel tubes and 16 barrels have shown very high 137-Cs activity compared to low activity measured in pool water. It was concluded that aluminium cladding of the fuel elements was penetrated due to corrosion process. Study on influence of water corrosion processes in the RA reactor storage pool was started within the framework of the IAEA CRP 'Corrosion of Research Reactor Aluminium-Clad Spent Fuel in Water' in 2002. The first test rack with various aluminium and stainless steel coupons, supplied by the IAEA, was immersed in the pool already in 1996. New racks were immersed in 2002 and 2003. The rack immersed in 1996 was taken out from the pool in 2002 and the rack immersed in 2002 was taken out in 2003. Results of the examination of these racks, carried out according to the strategy and the protocol, proposed by the IAEA, are described in this paper. (author)

  20. Radiation protection at the RA Reactor in 1993, Part II, Decontamination and actions, collection of liquid effluents and solid radioactive waste

    International Nuclear Information System (INIS)

    Mandic, M.; Vukovic, Z.; Lazic, S.; Plecas, I.; Voko, A.

    1993-01-01

    Certain amount of solid waste results from RA reactor operation, the mean quantity of which depends on the duration of reactor operation and related activities. During repair, when reactor is not operated as well under accidental conditions, the quantity of waste is higher, dependent on the type of repair and comprehensiveness of decontamination of the working surface, contaminated tools and components. The waste is sorted and packed on the spot where they appeared according to the existing regulations and principles of radiation protection with aim to minimize unnecessary exposure of the radiation protection personnel who deals with control, transport, radioactive waste treatment and decontamination. During exceptional operations (decontamination, repair, bigger volume of contaminated material, etc.) professional staff of the Radiation protection department gives recommendations and helps in planning the actions related to repair, sorting and packaging of radioactive waste in special containers, identification of the contaminants, etc. [sr

  1. Radiation protection at the RA Reactor in 1998, Part 2, Annex 2, Decontamination and actions, collection of liquid effluents and solid radioactive waste

    International Nuclear Information System (INIS)

    Mandic, M.; Vukovic, Z.; Bacic, S.; Plecas, I.

    1998-01-01

    Certain amount of solid waste results from RA reactor operation, the mean quantity of which depends on the duration of reactor operation and related activities. During repair, when reactor is not operated as well under accidental conditions, the quantity of waste is higher, dependent on the type of repair and comprehensiveness of decontamination of the working surface, contaminated tools and components. The waste is sorted and packed on the spot where they appeared according to the existing regulations and principles of radiation protection with aim to minimize unnecessary exposure of the radiation protection personnel who deals with control, transport, radioactive waste treatment and decontamination. During exceptional operations (decontamination, repair, bigger volume of contaminated material, etc.) professional staff of the Radiation protection department gives recommendations and helps in planning the actions related to repair, sorting and packaging of radioactive waste in special containers, identification of the contaminants, etc. [sr

  2. Radiation protection at the RA Reactor in 1995, Part -2, Annex 2, Decontamination and actions, collection of liquid effluents and solid radioactive waste

    International Nuclear Information System (INIS)

    Mandic, M.; Vukovic, Z.; Lazic, S.; Plecas, I.; Voko, A.

    1995-01-01

    Certain amount of solid waste results from RA reactor operation, the mean quantity of which depends on the duration of reactor operation and related activities. During repair, when reactor is not operated as well under accidental conditions, the quantity of waste is higher, dependent on the type of repair and comprehensiveness of decontamination of the working surface, contaminated tools and components. The waste is sorted and packed on the spot where they appeared according to the existing regulations and principles of radiation protection with aim to minimize unnecessary exposure of the radiation protection personnel who deals with control, transport, radioactive waste treatment and decontamination. During exceptional operations (decontamination, repair, bigger volume of contaminated material, etc.) professional staff of the Radiation protection department gives recommendations and helps in planning the actions related to repair, sorting and packaging of radioactive waste in special containers, identification of the contaminants, etc. [sr

  3. Radiation protection at the RA Reactor in 1989, Part -2, Decontamination, collection of treatment of fluid and solid radioactive waste, Annex 3

    International Nuclear Information System (INIS)

    Mandic, M.; Vukovic, Z.; Plecas, I.; Knezevic, Lj.; Lazic, S.; Bacic, S.

    1989-01-01

    Certain amount of solid waste results from RA reactor operation, the mean quantity of which depends on the duration of reactor operation and related activities. During repair, when reactor is not operated as well under accidental conditions, the quantity of waste is higher, dependent on the type of repair and comprehensiveness of decontamination of the working surface, contaminated tools and components. The waste is sorted and packed on the spot where they appeared according to the existing regulations and principles of radiation protection with aim to minimize unnecessary exposure of the radiation protection personnel who deals with control, transport, radioactive waste treatment and decontamination. During exceptional operations (decontamination, repair, bigger volume of contaminated material, etc.) professional staff of the Radiation protection department gives recommendations and helps in planning the actions related to repair, sorting and packaging of radioactive waste in special containers, identification of the contaminants, etc. [sr

  4. Digital computer operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Colley, R.W.

    1984-01-01

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state

  5. Actions needed for RA reactor exploitation - I-IV, Part II, Design project VI-SA 1, Experimental loop for testing the EL-4 reactor fuel elements in the central vertical experimental channel of the RA reactor in Vinca

    International Nuclear Information System (INIS)

    Novakovic, M.

    1961-12-01

    The objective of installing the VISA-1 loop was testing the fuel elements of the EL-4 reactor. The fuel elements planned for testing are natural UO 2 with beryllium cladding, cooled by CO 2 under nominal pressure of 60 at and temperature 600 deg C. central vertical experimental channel of the RA reactor was chosen for installing a test loop cooled by CO 2 . This report contains the detailed design project of the testing loop with the control system and safety analysis of the planned experiment

  6. Spent fuel from RA reactor inspection of state and options for management

    International Nuclear Information System (INIS)

    Aden, V.G.; Bulkin, S. Yu.; Sokolov, A. V.; Matausek, M.V.; Vukadin, Z.

    2001-01-01

    About five thousand spent fuel elements from RA reactor have been stored for over 30 years in sealed aluminum barrels in the spent fuel storage pool. This way of storage does not provide complete information about the state of spent fuel elements or the medium inside the barrels, like pressure or radioactivity. The technology has been developed and the equipment has been manufactured to inspect the state of the spent fuel and to reduce eventual internal pressure inside the aluminum barrels. The realization of this technology was started in 1999 but due to political and financial difficulties was not completed. In September the year 2000 the work was restarted. Two different ways of RA reactor spent fuel elements preparation for transportation or long-term storage are considered: 'all fuel elements canning without leak-tightness testing' and 'all fuel elements leak-tightness testing'. It is believed that the first option offers several distinct advantages, which can be summarized as: greater reliability in the course of transportation or dry storage. Higher safety for workers. Lower expenditures for non-standard equipment manufacturing. Shorter duration of work. (author)

  7. Monitoring device for reactor operation

    International Nuclear Information System (INIS)

    Sakagami, Masaharu.

    1980-01-01

    Purpose: To increase the freedom for the power control due to control rod operation and flow rate control, as well as prevent fuel failures by the provision of a power distribution forecasting device for forecasting the changes in the reactor core power distribution and a device for calculating the fuel performance index and judging to display the calculated values. Constitution: The results for the calculation of the reactor core power distribution from a process computer that processes each of measuring signals of a nuclear power plant are used as inputs to a fuel power history calculator to constitute the power history up to the present time for each of the fuels. The date are inputted to a fuel performance index calculator to calculate the fuel performance index at present time for each of the fuels. Changes in the power distribution are forecast in a forecasting device for reactor power distribution relative to the changes in the control variables of a control variable memory unit and the date are inputted to a fuel power history calculator to forecast the power changes for each of the fuels. The amount of the power changes is inputted to a fuel performance index calculator and a fuel performance indicating and judging device judges and displays if they exceed a predetermined value. (Seki, T.)

  8. Reorganization of the radiologic protection of the nuclear reactor RA-0 for the next starting up at Cordoba National University

    International Nuclear Information System (INIS)

    Martin, H.R.; Chautemps, N.A.; Rumis, D.A.

    1991-01-01

    Due to the fulfillment to the tasks for the new starting up of the RA-0 Nuclear Reactor situated at the National University of Cordoba, it was necessary to plan and organize the service of Radiologic Protection to meet the future requirements in normal operation. The special characteristics that an installation of this type has in the university field, required special attention for making the university staff become aware in the working proceedings to follow up in normal conditions, such as the case of emergency that would originate in the installation. The training of the teaching and non teaching staff of the National University of Cordoba, the adjusting of the installations, the obtention of dosimetry and measurement equipment and the implementation of a monitor system of the staff were the main tasks confronted for the reorganization of the sector. (Author) [es

  9. Dry storage of MTR spent fuel from the Argentine radioisotope production reactor RA-3

    International Nuclear Information System (INIS)

    Di Marco, A.; Gillaume, E.J.; Ruggirello, G.; Zaweruchi, A.

    1996-01-01

    The nuclear fuel elements of the RA-3 reactor consist in 19 rectangular fuel plates held in position by two lateral structural plates. The whole assembly is coupled to the lower nozzles that fits in the reactor core grid. The inner plates are 1.5 mm thick, 70.5 mm wide and 655 mm long and the outer plates are 100 mm longer. The fuel plates are formed by a core of an AI-U alloy co-laminated between two plates of Al. Enrichment is 90% 235 U. After being extracted from the reactor, the fuel elements have been let to cool down in the reactor storage pool and finally moved to the storage facility. This facility is a grid of vertical underground channels connected by a piping system. The system is filled with processed and controlled water. At the present the storage capacity of the facility is near to be depleted and some indications of deterioration of the fuel elements has been detected. Due to the present status of the facility and the spent fuel stored there, a decision has been taken to proceed to modify the present underwater storage to dry storage. The project consist in: a) Decontamination and conditioning of the storage channels to prepare them for dry storage. b) Disassembly of the fuel elements in hot cells in order to can only the active fuel plates in an adequate tight canister. c) The remnant structural pieces will be treated as low level waste. (author). 10 figs

  10. Independent CO2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Task 2.50.05

    International Nuclear Information System (INIS)

    Stojic, M.; Pavicevic, M.

    1964-01-01

    This report contains the following volumes V and VI of the Project 'Independent CO 2 loop for cooling the samples irradiated in RA reactor vertical experimental channels': Design project of the dosimetry control system in the independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, and Safety report for the Independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels [sr

  11. Tasks related to increase of RA reactor exploitation and experimental potential, 01. Designing the protection chamber in the RA reactor hall for handling the radioactive experimental equipment (I-II) Part II, Vol. II; Radovi na povecanju eksploatacionih i eksperimentalnih mogucnosti reaktora RA, 01. Projektovanje zastitne komore u hali reaktora RA za rad sa aktivnim eksperimentalnim uredjajima (I-II), II Deo, Album II

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-07-15

    This second volume of the project for construction of the protection chamber in the RA reactor hall for handling the radioactive devices includes the technical description of the chamber, calculation of the shielding wall thickness, bottom lead plate, horizontal stability of the chamber, cost estimation, and the engineering drawings.

  12. Measurement of the heavy water level in the fuel channels of the RA reactor - Annex 11

    International Nuclear Information System (INIS)

    Nikolic, M.

    1964-01-01

    The objective of measuring the heavy water level in the reactor channels was to verify experimentally the possibilities of reactor cooling with parallel operation of heavy water pumps od 1500 rotations/min at nominal power of 6.5 MW. Measurements were done in 2 periphery and 2 central fuel channels with pumps speed 1500, 1800 and 3000 rotations/min by a contact probe with electric resistance measuring device. precision of the measurement was ±1 cm

  13. Reactor science and technology: operation and control of reactors

    International Nuclear Information System (INIS)

    Qiu Junlong

    1994-01-01

    This article is a collection of short reports on reactor operation and research in China in 1991. The operation of and research activities linked with the Heavy Water Research Reactor, Swimming Pool Reactor and Miniature Neutron Source Reactor are briefly surveyed. A number of papers then follow on the developing strategies in Chinese fast breeder reactor technology including the conceptual design of an experimental fast reactor (FFR), theoretical studies of FFR thermo-hydraulics and a design for an immersed sodium flowmeter. Reactor physics studies cover a range of topics including several related to work on zero power reactors. The section on reactor safety analysis is concerned largely with the assessment of established, and the presentation of new, computer codes for use in PWR safety calculations. Experimental and theoretical studies of fuels and reactor materials for FBRs, PWRs, BWRs and fusion reactors are described. A final miscellaneous section covers Mo-Tc isotope production in the swimming pool reactor, convective heat transfer in tubes and diffusion of tritium through plastic/aluminium composite films and Li 2 SiO 3 . (UK)

  14. Reactor operation environmental information document

    Energy Technology Data Exchange (ETDEWEB)

    Wike, L.D.; Specht, W.L.; Mackey, H.E.; Paller, M.H.; Wilde, E.W.; Dicks, A.S.

    1989-12-01

    The Savannah River Site (SRS) is a large United States Department of Energy installation on the upper Atlantic Coastal Plain of South Carolina. The SRS contains diverse habitats, flora, and fauna. Habitats include upland terrestrial areas, varied wetlands including Carolina Bays, the Savannah River swamp system, and impoundment related and riparian wetlands, and the aquatic habitats of several stream systems, two large cooling reservoirs, and the Savannah River. These diverse habitats support a large variety of plants and animals including many commercially or recreational valuable species and several rare, threatened or endangered species. This volume describes the major habitats and their biota found on the SRS, and discuss the impacts of continued operation of the K, L, and P production reactors.

  15. In vivo BNCT in experimental and spontaneous tumors at RA-1 reactor

    International Nuclear Information System (INIS)

    Trivillin, Veronica A.; Heber, Elisa M.; Itoiz, Maria E.; Schwint, Amanda E.; Nigg, David W.

    2003-01-01

    Within the search for new applications of Boron Neutron Capture Therapy (BNCT) and the basic research oriented towards the study of BNCT radiobiology to optimize its therapeutic gain, we previously proposed and validated the hamster cheek pouch oral cancer model and showed, for the first time, the success of BNCT to treat oral cancer in an experimental model. The staff of the Ra-1 Reactor (Constituyentes Atomic Center) adapted the thermal beam and physical set-up to perform in vivo BNCT of superficial tumors in small animals. We preformed a preliminary characterization of the thermal beam, performed beam only irradiation of normal and tumor bearing hamsters and in vivo BNCT of experimental oral squamous cell carcinomas in hamsters mediated by boron phenylalanine (BPA) and GB-10 (Na 2 10 B 10 H 10 ). Having demonstrated the absence of radio toxic effects in healthy tissue and a therapeutic effect of in vivo BNCT in hamster cheek pouch tumors employing the Ra-1 thermal beam, we performed a feasibility study of the treatment by BNCT of 3 terminal cases of spontaneous head and neck squamous cell carcinoma in cats following the corresponding biodistribution studies. This was the first treatment of spontaneous tumors by BNCT in our country and the first treatment by BNCT in cats worldwide. This preclinical study in terminal cases showed significant tumor control by BNCT with no damage to normal tissue. (author)

  16. Prompt gamma neutron activation analysis facility at the RA-6 research reactor

    International Nuclear Information System (INIS)

    Sanchez, F. A.; Calzetta, O

    2004-01-01

    A prompt gamma neutron activation activation analysis facility was developed at the 500 kw thermal power RA-6 research reactor of the Bariloche Atomic Center, Argentina.This facility consist of a radial beam port with external positioning of the sample.The gamma radiation is reduced by a bismuth filter placed inside the extraction tube and the beam diameter is limited by a set of two collimators up to 5 cm.The neutron flux at the sample position is 7 10 6 n/cm 2 s with a Cadmium ratio of 20/1.The gamma detector is a 50 % efficiency type p HPGe rounded by a NaI(Tl) for Compton suppressioning.The gamma spectra is measured through 0 to 8.5 MeV.The background have counting rate of 350 cps without sample. In this work is shown the efficiency curve, the calculed sensibilities and the lower detection limits for B, Cd, Sm, Gd, H, Cl, Hg, Eu, Ti, Ag, Au, Mo. The RA-6's PGNAA facility is fully working, although the analytic capacity is under improvement [es

  17. Recent U.S. reactor operating experience

    International Nuclear Information System (INIS)

    Stello, V. Jr.

    1977-01-01

    A qualitative assessment of U.S. and foreign reactor operating experience is provided. Recent operating occurrences having potentially significant safety impacts on power operation are described. An evaluation of the seriousness of each of these issues and the plans for resolution is discussed. A quantitative report on U.S. reactor operational experience is included. The details of the NRC program for evaluating and applying operating reactor experience in the regulatory process is discussed. A review is made of the adequacy of operating reactor safety and environmental margins based on actual operating experience. The Regulatory response philosophy to operating reactor experiences is detailed. This discussion indicates the NRC emphasis on the importance of a balanced action plan to provide for the protection of public safety in the national interest

  18. Standards for safe operation of research reactors

    International Nuclear Information System (INIS)

    1996-01-01

    The safety of research reactors is based on many factors such as suitable choice of location, design and construction according to the international standards, it also depends on well trained and qualified operational staff. These standards determine the responsibilities of all who are concerned with the research reactors safe operation, and who are responsible of all related activities in all the administrative and technical stages in a way that insures the safe operation of the reactor

  19. Tasks related to increase of RA reactor exploitation and experimental potential, 01. Designing the protection chamber in the RA reactor hall for handling the radioactive experimental equipment (I-II) Part II, Vol. II

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1963-07-01

    This second volume of the project for construction of the protection chamber in the RA reactor hall for handling the radioactive devices includes the technical description of the chamber, calculation of the shielding wall thickness, bottom lead plate, horizontal stability of the chamber, cost estimation, and the engineering drawings

  20. Contamination, decontamination and radiochemical safety analyses of the RA reactor (Report 1966)

    International Nuclear Information System (INIS)

    Maksimovic, Z.

    1966-12-01

    This contract is concerned with development of methods for detection of fission products i the heavy water and quantitative radiochemical analysis for detecting one fission product which enables reliable verification of heavy water contamination by fission products and estimation of contamination level. Qualitative and quantitative radiometry measurements of fission products in water are shown on page 4. Page 6 shows study of contamination and decontamination of water on the laboratory level. Experiments have shown that the majority of fission products was adsorbed on the uranium oxide and that the iodine isotopes are partly in water (non-adsorbed). Gamma spectrometry analyses showed 131 I moves to distillate with the initial quantities of distilled water. decontamination factors compared to the total activity of fission products in distillator and distillate are not higher than ∼10 3 . Decontamination of water contaminated by uranium oxide and fission products in the distillation device of the RA reactor is shown on page 8. Experiments demanded special preparation due to high activity of uranium (1.7 g of uranium irradiated in the reactor for 10 days at neutron flux 1.10 13 n.cm 2 /s. Prior preparations for transport and dissolution of irradiated metal uranium as well as sampling were needed. Distillation was done under lower pressure and temperature to avoid possible contamination of the environment bu fission products and iodine. Decontamination factors are shown in Table. Contamination and decontamination of stainless steel on the laboratory level are described on page 5. It was found that the deposition of activity on the stainless steel plates is inhomogeneous showing that the uranium oxide and fission products are deposited on the rough metal surfaces. According to literature data and our laboratory studies decontamination was done by nitric acid solution (2MHNO 3 ). Since the heavy water system of the RA reactor was made of stainless teel (except the

  1. Investigation of the heavy water distillation system at the RA reactor; Ispitivanje sistema za destilaciju teske vode reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Zecevic, V; Badrljica, R [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    The heavy water distillation system was tested because this was not done before the reactor start-up. Detailed inspection of the system components showed satisfactory results. Leak testing was done as well as the testing of the instrumentation which enables reliable performance of the system. Performance testing was done with ordinary water and later 2700 l of heavy water from the reactor was purified, decreasing the activity by 45%.

  2. Activity of the Service for maintenance of the electronic equipment of the RA reactor in 1976, report - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1976-01-01

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system [sr

  3. Peak power factor determination of the RA-6 Argentinean Research Reactor using measurement-calculations correlations

    International Nuclear Information System (INIS)

    Sanchez, F. A.; Blaumann, H.; Lopasso, E.; Longhino, J

    2009-01-01

    The maximum power of a reactor is limited by the power peaking factor. During the design stage it is calculated with neutronic calculation codes. This is not enough for ensuring its value due to modelling approximations. For the RA-6s low enrichment new core a calculus-measurement correlation method have been applied. Position and magnitude of the maximum power density estimated by calculus are used by this method. For this work 249 cooper-gold alloy (1.55% Au) wires have been distributed along the core using 19 aluminium blades. Their positions have been selected using information given by a 5 groups PUMA reactor model. Wire s activity have been measured with a HPGe detector. Gold activity have been used only for verifying the calculated core spectrum. The measured power peaking factor was 2.48±0.3 (3σ), 15% above the calculated value. About 97% of measured points had less than 20% calculation-measurement difference and about 80% had less than 10%. The power peaking factor determined by this method consolidates also the calculations models. [es

  4. Computer monitoring of the RB reactor operation

    International Nuclear Information System (INIS)

    Milovanovic, S.; Pesic, M.; Milovanovic, T.

    1998-01-01

    Personal computer based acquisition system designed for monitoring of operation of the RB experimental reactor in the Institute of Nuclear Sciences 'Vinca' (former 'Boris Kidric') and experiences acquired during its use are shown in this paper. The monitoring covers generally all nuclear aspects of the reactor operation (start-up, nominal power operation, power changing, shut down and maintenance), but the emphasis is put on: real time (especially fast changing) reactivity measurement; supervising time dependence of the safety rods positions during shut down, and detection of position inaccuracy or failure operation of safety/control rods during the reactor operation or maintenance. (author)

  5. Operation and utilization of Indonesia Research Reactors

    International Nuclear Information System (INIS)

    Kuntoro, Iman; Sujalmo, Saiful; Tarigan, Alim

    2004-01-01

    For supporting the R and D in nuclear science and technology and its application, BATAN own and operate three research reactors namely, TRIGA-2000, KARTINI and RSG-GAS having thermal power of 2 MW, 100 kW and 30 MW respectively. The main features, operation and utilization progress of the reactors are described in this report. (author)

  6. Safety of research reactors (Design and Operation)

    International Nuclear Information System (INIS)

    Dirar, H. M.

    2012-06-01

    The primary objective of this thesis is to conduct a comprehensive up-to-date literature review on the current status of safety of research reactor both in design and operation providing the future trends in safety of research reactors. Data and technical information of variety selected historical research reactors were thoroughly reviewed and evaluated, furthermore illustrations of the material of fuel, control rods, shielding, moderators and coolants used were discussed. Insight study of some historical research reactors was carried with considering sample cases such as Chicago Pile-1, F-1 reactor, Chalk River Laboratories,. The National Research Experimental Reactor and others. The current status of research reactors and their geographical distribution, reactor category and utilization is also covered. Examples of some recent advanced reactors were studied like safety barriers of HANARO of Korea including safety doors of the hall and building entrance and finger print identification which prevent the reactor from sabotage. On the basis of the results of this research, it is apparent that a high quality of safety of nuclear reactors can be attained by achieving enough robust construction, designing components of high levels of efficiency, replacing the compounds of the reactor in order to avoid corrosion and degradation with age, coupled with experienced scientists and technical staffs to operate nuclear research facilities.(Author)

  7. PUSPATI Triga Reactor - First year in operation

    International Nuclear Information System (INIS)

    Nahrul Khair Rashid.

    1983-01-01

    First year operation of RTP reactor was mostly devoted to making in house training, setting up and testing the facilities in preparation for more routine operations. Generally the operations are categorized into 4 main purposes; experiment of research, teaching and training, demonstration, and testing and maintenance. These four purposes are elaborated in detail. Additions and modifications were performed in order to improve the safety of reactor operation. (A.J.)

  8. Radioactivity in the environment of the RA nuclear reactor in Vinca for the period 1977-1980. Material prepared for the RA reactor safety report; Radioaktivnost okoline nuklearnog reaktora RA u Vinci u periodu 1977-1980, Materijal pripremljen za izradu Sigurnosnog izvestaja za reaktor RA

    Energy Technology Data Exchange (ETDEWEB)

    Ajdacic, N; Martinc, R [Institute of nuclear sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1980-12-15

    Review of the environmental monitoring data presented in this report is prepared for the RA reactor safety report. These data resulted from four-year monitoring of precipitations and deposited dust. Measurements were done daily. In addition to these data, tables contain mean daily values, total monthly values of beta activities of precipitation from 1977 - 1980. Radioactivity control of the RA reactor environment showed that there was no significant discrepancy compared to the mean values for several years, apart from seasonal variations and meteorological influences. In the period from October 1976 to mid 1978 a number of higher values were recorded probably due to nuclear explosions. During 1979 the general activity level was relatively low, showing increase tendency during 1980.

  9. Reactor technology: power conversion systems and reactor operation and maintenance

    International Nuclear Information System (INIS)

    Powell, J.R.

    1977-01-01

    The use of advanced fuels permits the use of coolants (organic, high pressure helium) that result in power conversion systems with good thermal efficiency and relatively low cost. Water coolant would significantly reduce thermal efficiency, while lithium and salt coolants, which have been proposed for DT reactors, will have comparable power conversion efficiencies, but will probably be significantly more expensive. Helium cooled blankets with direct gas turbine power conversion cycles can also be used with DT reactors, but activation problems will be more severe, and the portion of blanket power in the metallic structure will probably not be available for the direct cycle, because of temperature limitations. A very important potential advantage of advanced fuel reactors over DT fusion reactors is the possibility of easier blanket maintenance and reduced down time for replacement. If unexpected leaks occur, in most cases the leaking circuit can be shut off and a redundant cooling curcuit will take over the thermal load. With the D-He 3 reactor, it appears practical to do this while the reactor is operating, as long as the leak is small enough not to shut down the reactor. Redundancy for Cat-D reactors has not been explored in detail, but appears feasible in principle. The idea of mobile units operating in the reactor chamber for service and maintenance of radioactive elements is explored

  10. Artificial intelligence in nuclear reactor operation

    International Nuclear Information System (INIS)

    Da Ruan; Benitez-Read, J.S.

    2005-01-01

    Assessment of four real fuzzy control applications at the MIT research reactor in the US, the FUGEN heavy water reactor in Japan, the BR1 research reactor in Belgium, and a TRIGA Mark III reactor in Mexico will be examined through a SWOT analysis (strengths, weakness, opportunities, and threats). Special attention will be paid to the current cooperation between the Belgian Nuclear Research Centre (SCK·CEN) and the Mexican Nuclear Centre (ININ) on AI-based intelligent control for nuclear reactor operation under the partial support of the National Council for Science and Technology of Mexico (CONACYT). (authors)

  11. Experience in operation of heavy water reactors

    International Nuclear Information System (INIS)

    Rotaru, Ion; Bilegan, Iosif; Ghitescu, Petre

    1999-01-01

    The paper presents the main topics of the CANDU owners group (COG) meeting held in Mangalia, Romania on 7-10 September 1998. These meetings are part of the IAEA program for exchange of information related mainly to CANDU reactor operation safety. The first meeting for PHWR reactors took place in Vienna in 1989, followed by those in Argentina (1991), India (1994) and Korea (1996). The topics discussed at the meeting in Romania were: operation experience and recent major events, performances of CANDU reactors and safe operation, nuclear safety and operation procedures of PHWR, programs and strategies of lifetime management of installations and components of NPPs, developments and updates

  12. Method of operating a nuclear reactor

    International Nuclear Information System (INIS)

    Spurgin, A.J.; Schaefer, W.F.

    1978-01-01

    A method of controlling a nuclear power generting station in the event of a malfunction of particular operating components is described. Upon identification of a malfunction, preselected groups of control rods are fully inserted sequentially until a predetermined power level is approached. Additional control rods are then selectively inserted to quickly bring the reactor to a second given power level to be compatible with safe operation of the system with the malfunctioning component. At the time the thermal power output of the reactor is being reduced, the turbine is operated at a rate consistent with the output of the reactor. In the event of a malfunction, the power generating system is operated in a turbine following reactor mode, with the reactor power rapidly reduced, in a controlled manner, to a safe level compatible with the type of malfunction experienced

  13. Operational experience of the Marcoule reactors

    International Nuclear Information System (INIS)

    Conte, F.

    1963-01-01

    The results obtaining from three years operation of the reactors G-2, G-3 have made it possible to accumulate a considerable amount of operational experience of these reactors. The main original points: - the pre-stressed concrete casing - the possibility of loading while under power - automatic temperature control have been perfectly justified by the results of operation. The author confirms the importance of these original solutions and draws conclusions concerning the study of future nuclear power stations. (author) [fr

  14. Manual for the operation of research reactors

    International Nuclear Information System (INIS)

    1965-01-01

    The great majority of the research reactors in newly established centres are light-water cooled and are often also light-water moderated. Consequently, the IAEA has decided to publish in its Technical Reports Series a manual dealing with the technical and practical problems associated with the safe and efficient operation of this type of reactor. Even though this manual is limited to light-water reactors in its direct application and presents the practices and experience at one specific reactor centre, it may also be useful for other reactor types because of the general relevance of the problems discussed and the long experience upon which it is based. It has, naturally, no regulatory character but it is hoped that it will be found helpful by staff occupied in all phases of the practical operation of research reactors, and also by those responsible for planning their experimental use. 23 refs, tabs

  15. Safety operation of training reactor VR-1

    International Nuclear Information System (INIS)

    Matejka, K.

    2001-01-01

    There are three nuclear research reactors in the Czech Republic in operation now: light water reactor LVR-15, maximum reactor power 10 MW t , owner and operator Nuclear Research Institute Rez; light water zero power reactor LR-0, maximum reactor power 5 kW t , owner and operator Nuclear Research Institute Rez and training reactor VR-1 Sparrow, maximum reactor power 5 kW t , owner and operate Faculty of Nuclear Sciences and Physical Engineering, CTU in Prague. The training reactor VR-1 Vrabec 'Sparrow', operated at the Faculty of Nuclear Sciences and Physical Engineering, Czech Technical University in Prague, was started up on December 3, 1990. Particularly it is designed for training the students of Czech universities, preparing the experts for the Czech nuclear programme, as well as for certain research work, and for information programmes in the nuclear programme, as well as for certain research work, and for information programmes in sphere of using the nuclear energy (public relations). (author)

  16. Program of critical experiment and measurements at the RA reactor; Program kriticnih eksperimenata i merenja na reaktoru RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1960-04-14

    Program described in this document describes in detail the following experiments: critical experiments with two reactor core lattices with 38 and 44 fuel channels, initial heavy water level being 1300 mm, criticality is achieved by adding heavy water; preliminary analysis of heavy water quality and verification of the fuel isotopic contents; experiment with the initial core which contains 56 fuel channels with maximum heavy water level according to the Russian proposal; measurement of neutron flux by Dy and In foils; measurement of reactivity excess dependent on the heavy water level and number of fuel rods; measurement of reactor period for determined reactivity change; measurement of moderator temperature coefficient; measurement of absolute flux. [Serbo-Croat] Program sadrzan u ovom dokumentu opisuje detaljno sledece eksperimente: kriticni eksperiment sa dve konfiguracije jezgra reaktora, sa 38 i 44 gorivna kanala, pocetni nivo teske vode je 1300 mm, kriticnost se dostize dodavanjem teske vode; prethodno izvrsenom analizom teske vode i proverom izotopskog sastava goriva; eksperiment sa pocetnom resetkom koja prema ruskom predlogu sadrzi 56 gorivnih kanala i maksimalnom visinom teske vode; merenje raspodele neutronskog fluksa folijama Dy i In; kalibracija regulacionih sipki; merenje viska reaktivnosti sa promenom visine nivoa teske vode i promenom broja sipki; merenje periode reaktora za odredjenu promenu reaktivnosti; merenje temperaturnog koeficijenta za vodu; merenje apsolutnog fluksa.

  17. Independent CO{sub 2} loop for cooling the samples irradiated in vertical experimental channels of the RA reactor, Vol. I; Nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u vertikalnim eksperimentalnim kanalima reaktora RA, Album I

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M; Pavlovic, A [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-06-15

    Project 'independent CO{sub 2} loop for cooling the samples irradiated in the vertical experimental channels of the RA reactor' is presented in two volumes: volume I - head of the low temperature coolant loop for reactor RA, and volume II - Outer low-temperature reactor coolant loop. Volume I includes: the design specifications for the head of the low-temperature coolant loop, technical description, thermal calculation, calculations of mechanical loads, antireactivity and activation of the components of the coolant loop head, engineering schemes and drawings, cost estimation data. [Serbo-Croat] Projekat 'Nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u vertikalnim eksperimentalnim kanalima reaktora RA', sastoji se od dva albuma: album I - Glava niskotemperaturno rashladne petlje za reaktor RA, album II - Spoljno kolo niskotemperaturne rashladne petlje za reaktora. Album I sadrzi projektni zadatak glave niskotemperaturne petlje, tehnicki opis, termicki proracun, proracun mehanickih naprezanja, antireaktivnosti i aktivacije kontrukcionih elemenata glave petlje, konstrukcione seme i crteze glave petlje, predracun.

  18. Operating manual for the Bulk Shielding Reactor

    International Nuclear Information System (INIS)

    1983-04-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR

  19. Operating manual for the Bulk Shielding Reactor

    International Nuclear Information System (INIS)

    1987-03-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR

  20. Operating manual for the Bulk Shielding Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1987-03-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxiliary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supersedes all previous operating manuals for the BSR.

  1. Operating manual for the Bulk Shielding Reactor

    Energy Technology Data Exchange (ETDEWEB)

    1983-04-01

    The BSR is a pool-type reactor. It has the capabilities of continuous operation at a power level of 2 MW or at any desired lower power level. This manual presents descriptive and operational information. The reactor and its auxillary facilities are described from physical and operational viewpoints. Detailed operating procedures are included which are applicable from source-level startup to full-power operation. Also included are procedures relative to the safety of personnel and equipment in the areas of experiments, radiation and contamination control, emergency actions, and general safety. This manual supercedes all previous operating manuals for the BSR.

  2. Preparation fo nuclear research reactors operators

    International Nuclear Information System (INIS)

    Roedel, G.

    1986-01-01

    The experience obtained with the training of operators of nuclear research reactors is presented. The main tool used in the experiments is the IPR-R1 reactor, a TRIGA MARK I type, owned by Nuclear Technology Development Centre (CDTN) of NUCLEBRAS. The structures of the Research Reactors Operators Training Course and of the Radiological Protection Course, as well as the Operators Qualifying and Requalifying Program, all of them prepared at CDTN are also presented. Mention is made of the application of similar experiments to other groups, such as students coming from Nuclear Sciences and Techniques Course of the Federal University of Minas Gerais. (Author) [pt

  3. Preparation of nuclear research reactors operators

    International Nuclear Information System (INIS)

    Roedel, G.

    1986-01-01

    The experience obtained with the training of operators of nuclear research reactors is presented. The main tool used in the experiments is the IPR-R1 reactor, a TRIGA MARK I type, owned by Nuclear Technology Development Centre (CDTN) of NUCLEBRAS. The structures of the Research Reactors Operators Training Course and of the Radiological Protection Course, as well as the Operators Qualifying and Requalifying Program, all of them prepared at CDTN, are also presented. Mention is made of the application of similar experiments to other groups, such as students coming from Nuclear Sciences and Techniques Course of the Federal University of Minas Gerais. (Author) [pt

  4. Calculation-measurement comparison for control rods reactivity in RA-3 nuclear reactor

    International Nuclear Information System (INIS)

    Estryk, Guillermo; Gomez, Angel

    2002-01-01

    The RA-3 Nuclear Reactor of the Atomic Energy National Commission from Argentina, begun working with high enrichment fuel elements in 1967, and turned to low enrichment by 1990. During 1999 it was found out that several fuel elements had problems, so more than 50 % of them had to be removed from the core. Because of this, it was planned to go from core 93 to core 94 with special care from nuclear safety point of view. Core 94 was preceded by other five, T-1 to T-5, only as transitory ones. The care implied several nuclear parameters measurements: core reactivity excess, calibration of control rods, etc. Calculations were performed afterwards to simulate those measurements using the neutron diffusion code PUMA. The comparison shows a good agreement for more than 80% of the cases with differences lower than 10% in reactivity. The greatest differences were found in the last part of the control rods calibration and a better calculation of cell constants is planned to be done in order to improve the adjustment. (author)

  5. Measurement of gamma radiation doses at the RA reactor by thermoluminescent dosemeters

    International Nuclear Information System (INIS)

    Prokic, M.

    1974-01-01

    This paper presents the procedures and gamma radiation doses measured at the exit from the horizontal experimental channel HK-5, vertical experimental channel VK-5 and in the thermal column of the RA reactor in Vinca. Measurement of gamma radiation dose in the mixed intense gamma and neutron radiation field was done by two types of thermoluminescent dosemeters, LiF (TLD-700) and CaF 2 (TLD-08). Gamma dose in the VK-5 was measured in the air and on the bottle filled with tissue-equivalent solution. Increase of the dose on the surface of the bottle was 2.3 compared to the gamma dose value in the air. Correction for the influence of neutrons having different energies was done by using the known sensitivity values of both TL dosemeter types for thermal, intermediate and fast neutrons. Results showed that the TLD-700 dosemeter contains 5 time more Li-6 isotopes (0.035%) than the declared value causing increased neutron sensitivity of this dosemeter. This paper includes numerical sensitivity data for neutrons of different energies for both types of TL dosemeters. Neutron sensitivity values for TLD-700 are related to LiF with 0.035% of Li-6 isotope. Result of measurement have also shown that the CaF 2 :Mn (TLD-08) thermoluminescent dosemeter is more suitable for gamma radiation dose measurements in mixed n-gamma fields with intensive neutron fluxes due to lower neutron sensitivity compared to TLD-700 [sr

  6. Reactor operations Brookhaven medical research reactor, Brookhaven high flux beam reactor informal monthly report

    International Nuclear Information System (INIS)

    Hauptman, H.M.; Petro, J.N.; Jacobi, O.

    1995-04-01

    This document is the April 1995 summary report on reactor operations at the Brookhaven Medical Research Reactor and the Brookhaven High Flux Beam Reactor. Ongoing experiments/irradiations in each are listed, and other significant operations functions are also noted. The HFBR surveillance testing schedule is also listed

  7. Management of operational events in research reactor

    International Nuclear Information System (INIS)

    Zhong Heping; Yang Shuchun; Peng Xueming

    2001-01-01

    The author describes the tracing management process post-operational event in a research reactor based on nuclear safety code, under the background of the research reactor in Nuclear Power Institute of China. It presorts the definite measures to the event tracing and it up its management factors

  8. Method of operating heavy water moderated reactors

    International Nuclear Information System (INIS)

    Masuda, Hiroyuki.

    1980-01-01

    Purpose: To enable stabilized reactor control, and improve the working rate and the safety of the reactor by removing liquid poison in heavy water while maintaining the power level constant to thereby render the void coefficient of the coolants negative in the low power operation. Method: The operation device for a heavy water moderated reactor comprises a power detector for the reactor, a void coefficient calculator for coolants, control rods inserted into the reactor, a poison regulator for dissolving poisons into or removing them out of heavy water and a device for removing the poisons by the poison regulator device while maintaining the predetermined power level or inserting the control rods by the signals from the power detector and the void coefficient calculator in the high temperature stand-by conditions of the reactor. Then, the heavy water moderated reactor is operated so that liquid poisons in the heavy water are eliminated in the high temperature stand-by condition prior to the start for the power up while maintaining the power level constant and the plurality of control rods are inserted into the reactor core and the void coefficient of the coolants is rendered negative in the low power operation. (Seki, T.)

  9. Measurement of the heavy water level in the fuel channels of the RA reactor - Annex 11; Prilog 11- Merenje nivoa teske vode u gorivnim kanalima reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Nikolic, M [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1964-12-15

    The objective of measuring the heavy water level in the reactor channels was to verify experimentally the possibilities of reactor cooling with parallel operation of heavy water pumps od 1500 rotations/min at nominal power of 6.5 MW. Measurements were done in 2 periphery and 2 central fuel channels with pumps speed 1500, 1800 and 3000 rotations/min by a contact probe with electric resistance measuring device. precision of the measurement was {+-}1 cm.

  10. Irradiation of an uranium silicide prototype in RA-3 reactor; Irradiacion de un elemento combustible prototipo de siliciuro de uranio en el RA-3

    Energy Technology Data Exchange (ETDEWEB)

    Calabrese, R; Estrik, G; Notari, C [Comision Nacional de Energia Atomica, San Martin (Argentina). Unidad de Actividad Reactores y Centrales Nucleares

    1997-12-31

    The factibility of irradiation of an uranium silicide (U{sub 3} Si{sub 2}) prototype in the RA-3 reactor was studied. The standard RA-3 fuel element uses U{sub 3} O{sub 8} as fissible material. The enrichment of both standard and prototype is the same: 20% U{sub 235} and also the frame geometry and number of plates is identical. The differences are in the plate dimensions and the fissile content which is higher in the prototype. The cooling conditions of the core allow the insertion of the prototype in any core position, even near the water trap, if the overall power is kept below 5Mw. Nevertheless, the recommendation was to begin irradiation near the periphery and later on move the prototype towards more central positions in order to increase the burnup rate. The prototype was effectively introduced in a peripheral position and the thermal fluxes were measured between plates with the foil activation technique. These were also evaluated with the fuel management codes and a reasonable agreement was found. (author). 5 refs., 3 figs., 3 tabs.

  11. Impact of proposed research reactor standards on reactor operation

    Energy Technology Data Exchange (ETDEWEB)

    Ringle, J C; Johnson, A G; Anderson, T V [Oregon State University (United States)

    1974-07-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  12. Impact of proposed research reactor standards on reactor operation

    International Nuclear Information System (INIS)

    Ringle, J.C.; Johnson, A.G.; Anderson, T.V.

    1974-01-01

    A Standards Committee on Operation of Research Reactors, (ANS-15), sponsored by the American Nuclear Society, was organized in June 1971. Its purpose is to develop, prepare, and maintain standards for the design, construction, operation, maintenance, and decommissioning of nuclear reactors intended for research and training. Of the 15 original members, six were directly associated with operating TRIGA facilities. This committee developed a standard for the Development of Technical Specifications for Research Reactors (ANS-15.1), the revised draft of which was submitted to ANSI for review in May of 1973. The Committee then identified 10 other critical areas for standards development. Nine of these, along with ANS-15.1, are of direct interest to TRIGA owners and operators. The Committee was divided into subcommittees to work on these areas. These nine areas involve proposed standards for research reactors concerning: 1. Records and Reports (ANS-15.3) 2. Selection and Training of Personnel (ANS-15.4) 3. Effluent Monitoring (ANS-15.5) 4. Review of Experiments (ANS-15.6) 5. Siting (ANS-15.7) 6. Quality Assurance Program Guidance and Requirements (ANS-15.8) 7. Restrictions on Radioactive Effluents (ANS-15.9) 8. Decommissioning (ANS-15.10) 9. Radiological Control and Safety (ANS-15.11). The present status of each of these standards will be presented, along with their potential impact on TRIGA reactor operation. (author)

  13. Experimental verification of methods for gamma dose rate calculations in the vicinity of containers with the RA reactor spent fuel elements

    International Nuclear Information System (INIS)

    Milosevic, M.; Cupac, S.; Pesic, M.

    2005-01-01

    The methodology for equivalent gamma dose rate determination on the outer surface of existing containers with the spent fuel elements of the RA reactor is briefly summarised, and experimental verification of this methodology in the field of gamma rays near the aluminium channel with spent fuel elements lifted from the stainless steel containers no. 275 in the RA reactor hall is presented. The proposed methodology is founded on: the existing fuel burnup data base; methods and models for the photon source determination in the RA reactor spent fuel elements developed in the Vinca Institute, and validated Monte Carlo codes for the equivalent gamma dose rate calculations. (author) [sr

  14. Operational safety and reactor life improvements of Kyoto University Reactor

    International Nuclear Information System (INIS)

    Utsuro, M.; Fujita, Y.; Nishihara, H.

    1990-01-01

    Recent important experience in improving the operational safety and life of a reactor are described. The Kyoto University Reactor (KUR) is a 25-year-old 5 MW light water reactor provided with two thermal columns of graphite and heavy water as well as other kinds of experimental facilities. In the graphite thermal column, noticeable amounts of neutron irradiation effects had accumulated in the graphite blocks near the core. Before the possible release of the stored energy, all the graphite blocks in the column were successfully replaced with new blocks using the opportunity provided by the installation of a liquid deuterium cold neutron source in the column. At the same time, special seal mechanisms were provided for essential improvements to the problem of radioactive argon production in the column. In the heavy-water thermal column we have accomplished the successful repair of a slow leak of heavy water through a thin instrumentation tube failure. The repair work included the removal and reconstructions of the lead and graphite shielding layers and welding of the instrumentation tube under radiation fields. Several mechanical components in the reactor cooling system were also exchanged for new components with improved designs and materials. On-line data logging of almost all instrumentation signals is continuously performed with a high speed data analysis system to diagnose operational conditions of the reactor. Furthermore, through detailed investigations on critical components, operational safety during further extended reactor life will be supported by well scheduled maintenance programs

  15. REACTOR CONTROL ROD OPERATING SYSTEM

    Science.gov (United States)

    Miller, G.

    1961-12-12

    A nuclear reactor control rod mechanism is designed which mechanically moves the control rods into and out of the core under normal conditions but rapidly forces the control rods into the core by catapultic action in the event of an emergency. (AEC)

  16. Planning the RA reactor fuel exchange - Task 3.08/03; Zadatak 3.08/03 - Planiranje izmene goriva reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Dobrosavljevic, N; Strugar, P [Institute of Nuclear Sciences Boris Kidric, Reaktor RA, Vinca, Beograd (Serbia and Montenegro)

    1963-12-15

    From the reactor start-up until January 1963, after reactor operation of 1246 MWd , there was a need for fuel exchange. It was necessary to develop a method for planning the refuelling scheme which would enable economic and most appropriate further operation. The most suitable scheme for refuelling would be continuous exchange, but this cannot be performed since each fuel exchange demand reactor shutdown of approximately 15 days. For that reason a compromise scheme was adopted, meaning the fresh fuel is added after each 60-80 days of operation. This report describes the method for approximate calculation of reactivity increase during exchange of the spent fuel element with the fresh one. Detailed plan for exchange of fuel exchange is given in the conclusions.

  17. Operational and reliability experience with reactor instrumentation

    International Nuclear Information System (INIS)

    Dixon, F.; Gow, R.S.

    1978-01-01

    In the last 15 years the CEGB has experienced progressive plant development, integration and changes in operating regime through nine nuclear (gas-cooled reactor) power stations with corresponding instrumentation advances leading towards more refined centralized control. Operation and reliability experience with reactor instrumentation is reported in this paper with reference to the progressive changes related to the early magnox, late magnox and AGR periods. Data on instrumentation reliability in terms of reactor forced outages are presented and show that the instrumentation contributions to loss of generating plant availability are small. Reactor safety circuits, neutron flux and temperature measurements, gas analysis and vibration monitoring are discussed. In reviewing the reactor instrumentation the emphasis is on reporting recent experience, particularly on AGR equipment, but overall performance and changes to magnox equipment are included so that some appreciation can be obtained of instrumentation requirements with respect to plant lifetimes. (author)

  18. Radiation protection at the RA Reactor in 1988, Part -2, Annex 2c, Environmental radioactivity control, meteorology measurements

    International Nuclear Information System (INIS)

    Grsic, Z.; Zaric, M.; Adamovic, M.; Stevanovic, M.

    1988-01-01

    During 1988, meteorology measurements were continued as a part of the environmental control of the Vinca Institute. This report covers the period from November 1984 - November 1985. Part of the meteorology measurements and data analysis is adapted to the needs of the Institute, i.e. RA reactor and some Laboratories. The objective of these activities is forming the data base for solving everyday and special problems related to control, protection and safety of Institute environment [sr

  19. Measurements for kinetic parameters estimation in the RA-0 research reactor

    International Nuclear Information System (INIS)

    Gomez, A; Bellino, P A

    2012-01-01

    In the present work, measurements based on the neutron noise technique and the inverse kinetic method were performed to estimate the different kinetic parameters of the reactor in its critical state. By means of the neutron noise technique, we obtained the current calibration factor of the ionization chamber M6 belonging to the power range channels of the reactor instrumentation. The maximum current allowed compatible with the maximum power authorized by the operation license was also obtained. Using the neutron noise technique, the reduced mean reproduction time (Λ*) was estimated. This parameter plays a fundamental role in the deterministic analysis of criticality accidents. Comparison with previous values justified performing new measurements to study systematic trends in the value of Λ*. Using the inverse kinetics method, the reactivity worth of the control rods was estimated, confirming the existence of spatial effects and trends previously observed (author)

  20. Operational reactor physics analysis codes (ORPAC)

    International Nuclear Information System (INIS)

    Kumar, Jainendra; Singh, K.P.; Singh, Kanchhi

    2007-07-01

    For efficient, smooth and safe operation of a nuclear research reactor, many reactor physics evaluations are regularly required. As part of reactor core management the important activities are maintaining core reactivity status, core power distribution, xenon estimations, safety evaluation of in-pile irradiation samples and experimental assemblies and assessment of nuclear safety in fuel handling/storage. In-pile irradiation of samples requires a prior estimation of the reactivity load due to the sample, the heating rate and the activity developed in it during irradiation. For the safety of personnel handling irradiated samples the dose rate at the surface of shielded flask housing the irradiated sample should be less than 200 mR/Hr.Therefore, a proper shielding and radioactive cooling of the irradiated sample are required to meet the said requirement. Knowledge of xenon load variation with time (Startup-curve) helps in estimating Xenon override time. Monitoring of power in individual fuel channels during reactor operation is essential to know any abnormal power distribution to avoid unsafe situations. Complexities in the estimation of above mentioned reactor parameters and their frequent requirement compel one to use computer codes to avoid possible human errors. For efficient and quick evaluation of parameters related to reactor operations such as xenon load, critical moderator height and nuclear heating and reactivity load of isotope samples/experimental assembly, a computer code ORPAC (Operational Reactor Physics Analysis Codes) has been developed. This code is being used for regular assessment of reactor physics parameters in Dhruva and Cirus. The code ORPAC written in Visual Basic 6.0 environment incorporates several important operational reactor physics aspects on a single platform with graphical user interfaces (GUI) to make it more user-friendly and presentable. (author)

  1. Spatial distribution of reactor radiation around the horizontal experimental hole of the RA Reactor at Vinca; Prostorna raspodela reaktorskog zracenja oko horizontalnog eksperimentalnog kanala reaktora RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M; Paligoric, D; Vujisic, B [Institute of Nuclear Sciences Vinca, Beograd (Serbia and Montenegro)

    1964-10-15

    A survey is given of the measurement of the spatial distribution of thermal and fast neutrons and gamma radiations inside and around the reactor radiation beam which is carried through the experimental channel outside the reactor biological shield thus being a potential danger for the personnel in the reactor hall. The results obtained are used to determine the optimal distribution of the shielding elements around the free radiation beam. The activation method was used to determine the distribution of slow and fast neutrons. The detectors were Au{sup 197} and In {sup 115} for slow, and the S{sup 32} (n,p) P{sup 32} reaction for fast neutrons. The relative distribution of slow and fast neutrons along the beam axis in the space outside the reactor, and evaluation of the absolute value of the flux at the place where the beam comes out from the biological shield are given (author)

  2. Determination of the neutron spectrum at different locations in the Argentine RA-1 Reactor

    International Nuclear Information System (INIS)

    Lerner, A.M.; Madariaga, M.R.

    1998-01-01

    Full text: It is well known that the RA-1 reactor is used to irradiate different types of materials with neutrons. The Radio dosimetry Group (which belongs to the Nuclear Regulatory Authority) uses its fast column for the design, calibration and set up of criticality dosimeters as well as for a quick assessment of the dose to workers in case of an accident. With such purpose, Au(1), Au under Cd and In(2) foils were irradiated to estimate absolute thermal, epithermal and fast neutron fluxes at the irradiation location. The accuracy of this estimation is higher when the response to the present neutron spectrum of the different materials constituting the detectors is better known. This, in turn, requires the previous knowledge of such spectrum (a detailed energy dependence of neutron flux) at the analysed location. In this work a neutronic calculation is presented at the fast irradiation location. The whole calculation was carried out following two different methodologies, and considering a power of 40 kW. The reactor and its surroundings were represented by a simplified one-dimensional model, as a concentric cylindrical set of regions. Figures are drawn representing fast and thermal fluxes (with the cut at 0.4 eV) as a function of the distance to the core centre. The neutron flux (in n/cm 2 sec.eV) as a function of energy is also shown at the fast irradiation location. Values of flux (in n/cm 2 .sec.eV) are also provided as a function of energy in other typical locations, as well as the equivalent integrated flux values (in n/cm 2 .sec). ((1) According to the reaction Au 197 (n,γ)Au 198 , having a cross section of σ 0 =98.8b for thermal neutrons. (2) According to the reaction In 115 (n,n')In 115m , with a cross section of some 70 mb for neutrons with energies above 1.2MeV). (author) [es

  3. Status report about the works for the start up of the RA-0 'zero power' nuclear reactor at the Cordoba National University

    International Nuclear Information System (INIS)

    Martin, H.R; Carballido, C.; Oliveras, T.

    1991-01-01

    After two years of works at the Cordoba National University for the new start-up of the RA-0 'zero power' nuclear reactor, the results obtained are herein presented. Starting with practically null infrastructure at the beginning, specially in human resources and instrumentation of the reactor, the objectives can be considered satisfactory. The training in work of the future operational staff, the design and the construction of the instrumentation and the fitting of the installations are the principal items described in this paper. An special attention is devoted to the insertion of this type of installation in the university organization, usually not prepared for the quality and control activities, which is necessarily considered in these type of works. (Author) [es

  4. Operational behaviour of a reactor normal operation and disturbances

    International Nuclear Information System (INIS)

    Geyer, K.H.

    1982-01-01

    During normal operation, the following topics are dealt with: primary and secondary coolant circuits - full load operation - start-up and shutdown - steady state part load diagramm. During disturbances and incidents, the following procedures are discussed: identification and detection of the events - automatic actions - manual actions of the operator - provided indications - explanation of actuated systems - basic information of reactor protection system. (RW)

  5. Dynamics of nuclear reactor operational cycles

    International Nuclear Information System (INIS)

    Chapman, L.D.; Wayland, J.R.

    With this system dynamics computer model, one can explore the long term effects of a nuclear reactor program. Given an input demand for reactors, the consequences on each sector and the interactions among sectors can be simulated to provide a better understanding of the time development of a nuclear reactor program. The model permits the determination of various levels of activity as a function of time for plant enrichment, fuel fabrication, fuel reprocessing and storage of waste products. In addition, the rates of construction of reactors, spent fuel transit, disposal of waste, mining, shipping, recycling and enrichment can be investigated for optimal planning purposes. The model has been written in a very general manner so that it can be used to simulate any nuclear reactor program. It is an easy task to relate the amount of accidental or operational release of radioactive contaminants into our environment to the activity levels of each of the above sectors. (U.S.)

  6. Reactor operation plan preparing device

    International Nuclear Information System (INIS)

    Sano, Hiroki; Maruyama, Hiromi; Kinoshita, Mitsuo; Fukuzaki, Koji; Banto, Masaru; Fukazawa, Yukihisa.

    1993-01-01

    The device comprises a means for retrieving a control rod pattern capable of satisfying a thermal limit upon aimed power/minimum flow rate and providing minimum xenon and a control rod pattern maximum xenon. It further comprises a means for selecting a control rod pattern corresponding to a xenon equilibrium condition, and selecting a control rod which provides a greater thermal margin to provide a control rod operation sequence for each of the patterns. Further, the device comprises an outline plan preparing means and a correction means therefor, a simplified sequence table reference means operated along with sequence change, an operation limit region input means, a control rod operation preferential region changing means, a thermal margin evaluation region and an input means. This can automatically prepare the operation plan, decrease the times for preparation of detailed plans by using the outline plan preparing function, thereby enabling to remarkably shorten the time for preparing of an operation plan. (N.H.)

  7. Design project of the dosimetry control system in the independent CO2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Vol. V

    International Nuclear Information System (INIS)

    1964-01-01

    Design project of the dosimetry control system in the independent CO 2 loop for cooling the samples irradiated in the RA reactor vertical experimental channels includes the following: calculations of CO 2 gas activity, design of the dosimetry control system, review of the changes that should be done in the RA reactor building for installing the independent CO 2 loop, specification of the materials with cost estimation, engineering drawings of the system [sr

  8. Reactor operation feed-back in France

    International Nuclear Information System (INIS)

    Feltin, C.; Fourest, B.; Libmann, J.

    1982-09-01

    The Nuclear Safety Department (DSN), technical support of French Safety Authorities, is, in particular, in charge of the analysis of reactor operation and of measures taken consequently to incidents. It proposed the criteria used to select significant incidents; it analyzes such incidents. DSN also analyzes the operating experience of each plant, several years after starting. It examines foreign incidents to assess in what extent lessons learned can be applied to french reactors. The examples presented show that to improve the safety of units operation, the experience feed-back leads to make arrangements, or modifications concerning not only circuits or materials but often procedures. Moreover they show the importance of procedures concerning the operations carried out during reactor shutdown

  9. Dosimetry and technical radiation protection at the RA Reactor - Report for 1977, Annex V; Prilog V - Dozimetrija i tehnicka zastita od zracenja kod reaktora RA - Izvestaj za 1977. godinu

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M et al. [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1977-12-15

    This report includes data about the level of gamma and neutron radiation, and level of contamination in the working environment at the RA reactor, data about collective and individual exposure of the staff to radiation, data about contamination and decontamination as well as radioactive waste. During 1977, at the RA reactor there was no accident that would cause significant exposure of tf the staff or contamination of the working space and the environment of the reactor. [Serbo-Croat] Ovaj Izvestaj sadrzi podatke o nivou gama i neutronskog zracenja i stepenu kontaminacije radne sredine, podatke o individualnom i kolektivnom izlaganju zracenju radnog osoblja, podatke o kontaminaciji i dekontaminaciji kao i o radioaktivnom otpadu. U toku 1977. godine, na reaktoru RA nije bilo akcidenata vecih razmera koji bi za posledice imali znacajnije ozracivanje radnog osoblja i kontaminaciju radne sredine i okoline.

  10. Activities needed for exploitation of the RA reactor I-IV, Part III, IZ-093-0103-1961; Radovi za potrebe eksploatacije raktora RA - I-IV - III deo, IZ-093-0103-1961

    Energy Technology Data Exchange (ETDEWEB)

    Jurida, V [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    For the purpose of designing the low-temperature loop at the RA reactor, a list of materials that would be irradiated in the reactor was made. This document includes a review of the radiochemistry data for the listed materials and data about thermal stability of the mentioned materials. Calculation of heat generated in listed samples was based on the theoretical and experimental results of radiation characteristics of the RA reactor. Maximum temperature values in the samples without forced cooling are calculated. [Serbo-Croat] Za potrebe projektovanja niskotemperaturne petlje na reaktoru RA nacinjen je pregled materijala za ozracivanje u reaktoru. Ovaj dokument sadrzi pregled radiajaciono hemijskih podataka za navedene materijale i podatke o termickoj stabilnosti pomenutih materijala. Toplota generisana u navedenim uzorcima racunata je uzimajuci u obzir osnovne podatke teorijske i eksperimentalne rezultate odredjivanja karakteristika zracenja u reaktoru. Izracunate su maksimalne temperature u uzorcima bez prinudnog hladjenja.

  11. Method of operating FBR type reactors

    International Nuclear Information System (INIS)

    Arie, Kazuo.

    1984-01-01

    Purpose: To secure the controlling performance and the safety of FBR type reactors by decreasing the amount of deformation due to the difference in the heat expansion of a control rod guide tube. Method: The reactor is operated while disposing reactor core fuel assemblies of a same power at point-to-point symmetrical positions relative to the axial center for the control rod assembly. This can eliminate the temperature difference between opposing surfaces of the control rod guide tube and eliminate the difference in the thermal expansion. (Yoshino, Y.)

  12. Neutron magnetic scattering experiments performed by VIKRA group at the RA reactor in Vinca; Eksperimenti grupe VIKRA na reaktoru RA u Vinci sa rasejanjem neutrona na magnetnim materijalima

    Energy Technology Data Exchange (ETDEWEB)

    Kranicki, S; Rzany, H; Wanic, A [Institute of Nuclear Physics, Krakov (Poland); Szytula, A [Jagiellonian University, Krakov (Poland); Todorovic, J; Dimitrijevic, Z; Radenkovic, S [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Yugoslavia)

    1978-05-15

    A short communication about investigations of magnetic materials by means of the neutron magnetic scattering performed by Polish-Yugoslav group VIKRA (Vinca-Krakov) at the RA reactor in Vinca in the period 1962-1977 will be presented. In the field of neutron inelastic scattering information about magnetic interactions (exchange integrals) and their temperature behaviour in such substances as Fe{sub 7}S{sub 8}, {alpha}-Fe{sub 2}O{sub 3}, CR{sub 2}O{sub 3}, {alpha}-Co, Cu{sub 2}MnAl and Mn{sub 1.88}Cr{sub 0.12}Sb was obtained by measuring magnon dispersion relations. In the field of neutron elastic scattering valuable results concerning crystallographic and magnetic structures of oxyhydroxides, several Heusler alloys and intermetallic compounds of 3d metals (for instance of NiMnGe, CoMnSi) were obtained. A short description of the KSN spectrometer used in all experiments will also be given. (author) Dato je kratko saopstenje o istrazivanjima magnetnih materijala magnetnim neutronskim rasejanjem izvrsenim od strane poljsko-jugoslovenske grupe VIKRA (Vinca-Krakov) na reaktoru RA u Vinci u periodu od 1962-1977. U oblasti neelasticnog rasejanja neutrona, obavestenja o magnetnim uzajamnim dejstvima (integralima izmene) i njihovim temperaturskim ponasanjima su dobijeni merenjem disperzione relacije magnona u takvim materijalima kao sto su Fe{sub 7}S{sub 8}, {alpha}-Fe{sub 2}O{sub 3}, CR{sub 2}O{sub 3}, {alpha}-Co, Cu{sub 2}MnAl and Mn{sub 1.88}Cr{sub 0.12}Sb. U oblasti neutronskog elasticnog rasejanja dobijeni su korisni rezultati o kristalografskim i magnetnim strukturama oksihidroksida gvozdja, niza Heuslerovih legura i intermetalnih jedinjenja 3d metala (napr. NiMnGe, Co,MnSi). Dat je kratak opis KSN spektrometra upotrebljenog u svim ovim eksperimentima. (author)

  13. Radiation protection at the RA Reactor in 1985, Part -3, Removal and treatment of radioactive effluents for the needs of RA reactor

    International Nuclear Information System (INIS)

    Plecas, I.; Vukovic, Z.; Kostadinovic, A.

    1985-01-01

    Contaminated water originates from: hot cells, heavy water distillation device, storage pools for cooling and cutting of fuel elements, water biological shield of the reactor. During 1985 5 m of contaminated water was released from hot cells in the VR-pool containing highly radioactive waste water with 60 Co and trace amount of fission products [sr

  14. Radiation protection at the RA Reactor in 1989, Part -2, Decontamination, collection of treatment of fluid and solid radioactive waste, Annex 3; Deo 2 - Zastita od zracenja kod reaktora RA u 1989. godini, Dekontaminacija i intervencija, sakupljanje i obrada tecnih i cvrstih radioaktivnih otpadnih materija za potrebe reaktora RA - Prilog 3

    Energy Technology Data Exchange (ETDEWEB)

    Mandic, M; Vukovic, Z; Plecas, I; Knezevic, Lj; Lazic, S; Bacic, S [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1989-12-15

    Certain amount of solid waste results from RA reactor operation, the mean quantity of which depends on the duration of reactor operation and related activities. During repair, when reactor is not operated as well under accidental conditions, the quantity of waste is higher, dependent on the type of repair and comprehensiveness of decontamination of the working surface, contaminated tools and components. The waste is sorted and packed on the spot where they appeared according to the existing regulations and principles of radiation protection with aim to minimize unnecessary exposure of the radiation protection personnel who deals with control, transport, radioactive waste treatment and decontamination. During exceptional operations (decontamination, repair, bigger volume of contaminated material, etc.) professional staff of the Radiation protection department gives recommendations and helps in planning the actions related to repair, sorting and packaging of radioactive waste in special containers, identification of the contaminants, etc. [Serbo-Croat] Tokom rada reaktora RA dolazi do stvaranja odredjenih cvrstih otpadnih materijala cija prosecna kolicina zavisi od vremena rada reaktora i aktivnosti koje se tamo obavljaju. Tokom remonta, kada reaktor ne radi kao i pri akcidentalnim situacijama nastaju vece kolicine otpadnih materijala koje zavise od obima i vrste remontnih operacija i obima dekontaminacije kontaminirane radne povrsine i kontaminiranog alata, predmeta, opreme, itd. Nastali otpadni materijali se razvrstavaju i pakuju na mestu nastanka prema odgovarajucim propisima u skladu sa principima zastite od zracenja i aspekta bezbednosti u cilju minimiziranja nepotrebnog ozracivanja ljudstva za preuzimanje, kontrolu, transport, naknadnu obradu RAO i dekontaminaciju. Pri nerutinskim operacijama (dekontaminacija, remont, kontaminiarni otpadni materijal velike zapremine i sl.), strucna sluzba Institita ZASTITA pruza strucne konsultacije i pomaze pri planiranju

  15. Radiation protection at the RA reactor in 1984, Part III Removal of the liquid radioactive effluents for the needs of the RA reactor

    International Nuclear Information System (INIS)

    Mandic, M.; Plecas, I.; Vukovic, Z.; Knezevic, Lj.; Jankovic, O.; Kostadinovic, A.; Mihailovic, B.

    1984-01-01

    Contaminated water originates from: hot cells, heavy water distillation device, storage pools for cooling and cutting of fuel elements, water biological shield of the reactor. During 1984, 400 liters of water contaminated by 60 Co was treated. Most recent measurements showed that the VR-1 pool contains 280 m 3 of effluents having specific activity of 3.3 10 4 Bq/ml, and VR-2 contains 30 m 3 with specific activity of 4 10 3 Bq/ml

  16. Radiation protection at the RA nuclear reactor in 1987, Part II.a. Control of radioactivity in the environment of the RA nuclear reactor (precipitation, fallout, water, soil, plants, fruit)

    International Nuclear Information System (INIS)

    Martic, M.; Ajdacic, N.; Jovanovic, J.

    1987-01-01

    Control of radioactivity in the biosphere in the vicinity of the RA reactor is part of the radioactivity control done regularly for the whole territory of the Vinca Institute. According to the measurements during 1987 it was found that the total contamination of the precipitation was highest in January compared to the period before Chernobylsk accident. Mean monthly value of the total beta cavity was highest in April 5.41 times higher than the relevant value in 1986. This is a preliminary report, the measurement data will be presented after after analysis in the annual report [sr

  17. Mode of operation of a nuclear reactor

    International Nuclear Information System (INIS)

    Morita, T.

    1976-01-01

    A method is proposed for the operation of a nuclear reactor guaranteeing an essentially symmetrical axial power distribution during normal operation by controlling the changes occuring in the reactor power partly by variation of the concentration of the neutron-absorbing element and partly by variation of the control rod positions. The representative parameters are recorded for the upper and lower half and adjusted to a predetermined reference value. In using this method, the axial power peals are reduced and power losses avoided. (RW) [de

  18. Method of operating BWR type reactors

    International Nuclear Information System (INIS)

    Sekimizu, Koichi

    1980-01-01

    Purpose: To enable reactor control depending on any demanded loads by performing control by the insertion of control rods in addition to the control by the regulation of the flow rate of the reactor core water at high power operation of a BWR type reactor. Method: The power is reduced at high power operation by decreasing the flow rate of reactor core water from the starting time for the power reduction and the flow rate is maintained after the time at which it reaches the minimum allowable flow rate. Then, the control rod is started to insert from the above time point to reduce the power to an aimed level. Thus, the insufficiency in the reactivity due to the increase in the xenon concentration can be compensated by the withdrawal of the control rods and the excess reactivity due to the decrease in the xenon concentration can be compensated by the insertion of the control rods, whereby the reactor power can be controlled depending on any demanded loads without deviating from the upper or lower limit for the flow rate of the reactor core water. (Moriyama, K.)

  19. Operational safety evaluation for minor reactor accidents

    International Nuclear Information System (INIS)

    Wang, O.S.

    1981-01-01

    The purpose of this paper is to address a concern of applying conservatism in analysing minor reactor incidents. A so-called ''conservative'' safety analysis may exaggerate the system responses and result in a reactor scram tripped by the reactor protective system (RPS). In reality, a minor incident may lead the reactor to a new thermal hydraulic steady-state without scram, and the mitigation or termination of the incident may entirely depend on operator actions. An example on a small steamline break evaluation for a pressurized water reactor recently investigated by the staff at the Washington Public Power Supply System is presented to illustrate this point. A safety evaluation using mainly the safety-related systems to be consistent with the conservative assumptions used in the Safety Analysis Report was conducted. For comparison, a realistic analysis was also performed using both the safety- and control-related systems. The analyses were performed using the RETRAN plant simulation computer code. The ''conservative'' safety analysis predicts that the incident can be turned over by the RPS scram trips without operator intervention. However, the realistic analysis concludes that the reactor will reach a new steady-state at a different plant thermal hydraulic condition. As a result, the termination of the incident at this stage depends entirely on proper operator action. On the basis of this investigation it is concluded that, for minor incidents, ''conservative'' assumptions are not necessary, sometimes not justifiable. A realistic investigation from the operational safety point of view is more appropriate. It is essential to highlight the key transient indications for specific incident recognition in the operator training program

  20. RA reactor safety analysis I-III, Part III - Environmental effect of the maximum credible accident; Analiza sigurnosti rada Reaktora RA I-III, III deo - Posledica maksimalno moguceg akcidenta na okolinu reaktora

    Energy Technology Data Exchange (ETDEWEB)

    Raisic, N [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-02-15

    The objective of the maximum credible accident analysis was to determine the integral radiation doses in the vicinity of the reactor and in the environment. In case of RA reactor the maximum credible accident, meaning release of the fission products, would be caused by fuel elements meltdown. This analysis includes the following calculation results: activity of the fission products, volatility of the fission products, concentration of radioactive materials in the air, analysis of the accident environmental effects.

  1. Fuel management for TRIGA reactor operators

    International Nuclear Information System (INIS)

    Totenbier, R.E.; Levine, S.H.

    1980-01-01

    One responsibility of the Supervisor of Reactor Operations is to follow the TRIGA core depletion and recommend core loading changes for refueling and special experiments. Calculations required to analyze such changes normally use digital computers and are extremely difficult to perform for one who is not familiar with computer language and nuclear reactor diffusion theory codes. The TRICOM/SCRAM program developed to perform such calculations for the Penn State TRIGA Breazeale Reactor (PSBR), has a very simple input format and is one which can be used by persons having no knowledge of computer codes. The person running the program need not understand computer language such as Fortran, but should be familiar with reactor core geometry and effects of loading changes. To further simplify the input requirements but still allow for all of the studies normally needed by the reactor operations supervisor, the options required for input have been isolated to two. Given a master deck of computer cards one needs to change only three cards; a title card, core energy history information card and one with core changes. With this input, the program can provide individual fuel element burn-up for a given period of operation and the k eff of the core. If a new loading is desired, a new master deck containing the changes is also automatically provided. The life of a new core loading can be estimated by feeding in projected core burn-up factors and observing the resulting loss in individual fuel elements. The code input and output formats have now been made sufficiently convenient and informative as to be incorporated into a standard activity for the Reactor Operations Supervisor. (author)

  2. The SM and MIR reactors operation experience

    International Nuclear Information System (INIS)

    Kuprienko, V.A.; Klinov, A.V.; Svyatkin, M.N.; Shamardin, V.K.

    1995-01-01

    The SM and MIR operation experience show that continuous work on the problem of ageing, in all its aspects, allows for prolongation of the research plant life cycle by several folds as compared to the initial project. The redesigned SM-3 reactor will operate for another 20 years. The similar result is expected from the MIR planned reconstruction which scope will be the topic of future presentations. (orig.)

  3. Actions needed for RA reactor exploitation - I-IV, Part II, Design project VI-SA 1, Experimental loop for testing the EL-4 reactor fuel elements in the central vertical experimental channel of the RA reactor in Vinca; Radovi za potrebe eksploatacije reaktora RA - I-IV, II Deo, Predprojekat VI-SA 1, Petlja za ispitivanje gorivnih elemenata reaktora EL-4 u centralnom vertikalnom eksperimentalnom kanalu reaktora RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Novakovic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    The objective of installing the VISA-1 loop was testing the fuel elements of the EL-4 reactor. The fuel elements planned for testing are natural UO{sub 2} with beryllium cladding, cooled by CO{sub 2} under nominal pressure of 60 at and temperature 600 deg C. central vertical experimental channel of the RA reactor was chosen for installing a test loop cooled by CO{sub 2}. This report contains the detailed design project of the testing loop with the control system and safety analysis of the planned experiment.

  4. Status report about the works for the start up of the RA-0 `zero power` nuclear reactor at the Cordoba National University; Estado actual de avance de las tareas para la nueva puesta en marcha del reactor nuclear RA-0 en la Universidad Nacional de Cordoba

    Energy Technology Data Exchange (ETDEWEB)

    Martin, H R; Carballido, C; Oliveras, T

    1992-12-31

    After two years of works at the Cordoba National University for the new start-up of the RA-0 `zero power` nuclear reactor, the results obtained are herein presented. Starting with practically null infrastructure at the beginning, specially in human resources and instrumentation of the reactor, the objectives can be considered satisfactory. The training in work of the future operational staff, the design and the construction of the instrumentation and the fitting of the installations are the principal items described in this paper. An special attention is devoted to the insertion of this type of installation in the university organization, usually not prepared for the quality and control activities, which is necessarily considered in these type of works. (Author). [Espanol] Luego de aproximadamente dos anos de trabajo para la nueva puesta en marcha del REACTOR NUCLEAR RA-0, se han alcanzado los resultados presentados en este trabajo. Partiendo de una infraestructura practicamente inexistente en cuanto a recursos humanos y estado de las instalaciones, los avances logrados son significativos. Comenzando por la capacitacion y el entrenamiento del futuro personal de operacion y pasando por la adecuacion de los equipos y componentes, hasta la confeccion de la documentacion mandatoria, se muestran los aspectos mas destacables de los trabajos realizados. Una atencion especial se dedica a la insercion de una instalacion de este tipo en el ambito universitario, el cual por sus particulares caracteristicas, ha debido ser tenido en cuenta permanentemente para la futura operacion de las instalaciones. (Autor).

  5. Good practices in heavy water reactor operation

    International Nuclear Information System (INIS)

    2010-06-01

    The value and importance of organizations in the nuclear industry engaged in the collection and analysis of operating experience and best practices has been clearly identified in various IAEA publications and exercises. Both facility safety and operational efficiency can benefit from such information sharing. Such sharing also benefits organizations engaged in the development of new nuclear power plants, as it provides information to assist in optimizing designs to deliver improved safety and power generation performance. In cooperation with Atomic Energy of Canada, Ltd, the IAEA organized the workshop on best practices in Heavy Water Reactor Operation in Toronto, Canada from 16 to 19 September 2008, to assist interested Member States in sharing best practices and to provide a forum for the exchange of information among participating nuclear professionals. This workshop was organized under Technical Cooperation Project INT/4/141, on Status and Prospects of Development for and Applications of Innovative Reactor Concepts for Developing Countries. The workshop participants were experts actively engaged in various aspects of heavy water reactor operation. Participants presented information on activities and practices deemed by them to be best practices in a particular area for consideration by the workshop participants. Presentations by the participants covered a broad range of operational practices, including regulatory aspects, the reduction of occupational dose, performance improvements, and reducing operating and maintenance costs. This publication summarizes the material presented at the workshop, and includes session summaries prepared by the chair of each session and papers submitted by the presenters

  6. Experience in using a research reactor for the training of power reactor operators

    International Nuclear Information System (INIS)

    Blotcky, A.J.; Arsenaut, L.J.

    1972-01-01

    A research reactor facility such as the one at the Omaha Veterans Administration Hospital would have much to offer in the way of training reactor operators. Although most of the candidates for the course had either received previous training in the Westinghouse Reactor Operator Training Program, had operated nuclear submarine reactors or had operated power reactors, they were not offered the opportunity to perform the extensive manipulations of a reactor that a small research facility will allow. In addition the AEC recommends 10 research reactor startups per student as a prerequisite for a cold operator?s license and these can easily be obtained during the training period

  7. Characterization of the neutron flow for the implementation of an experimental analysis installation for rapid gamma activation in the Argentine Research Reactor RA-6

    International Nuclear Information System (INIS)

    Henriquez, C.; Gennuso, G.

    2000-01-01

    This is the final work to obtain a Diploma on Specialization in Application of Nuclear Technological Energy, carried out at the Research Reactor RA-6, from March to December 1999. Different work has been realized on the Tangential Tube N of the 500 KW Argentine RA-6 research reactor, in order to add a new technique to the present existing analytical methods. This Prompt Gamma Neutron Activation Analysis technique (PGNAA) requires a beam of collimated thermal neutrons, a lowest possible gamma radiation, and a thermal component of the biggest possible cadmium rate. It also must have a high resolution detection system for the measurement of the gamma radiation emitted after the capture of the neutron produced in the study sample. Continuing with the facility's technical requirements, a collimator was installed inside the N passing tube, in order to concentrate the neutrons coming from the nuclear core and also to compensate possible losses during the path. This collimator is 440mm long and 200 mm in diameter and consists of lead and steel cylinders with different size holes on the inside, so that it can deliver a 50 mm diameter beam of thermal collimated neutrons. Two 100 mm thick bismuth filters are inside the passing tube, to reduce the gamma component inside de beam, coming from the reactor core. This work aims to the characterization of the thermal and epithermal component of the neutron beam in the collimator and at the exit of it , and also to prove experimentally that the collimator achieves the technical specifications for which it was designed and built, specifically by verifying its functioning (degree of convergence of the beam obtained). On the other hand, it is necessary to learn about the PGNAA technique in order to define the technical requirements for its adequate operation. (author)

  8. Fractional power operation of tokamak reactors

    International Nuclear Information System (INIS)

    Mau, T.K.; Vold, E.L.; Conn, R.W.

    1986-01-01

    Methods to operate a tokamak fusion reactor at fractions of its rated power, identify the more effective control knobs and assess the impact of the requirements of fractional power operation on full power reactor design are explored. In particular, the role of burn control in maintaining the plasma at thermal equilibrium throughout these operations is studied. As a prerequisite to this task, the critical physics issues relevant to reactor performance predictions are examined and some insight into their impact on fractional power operation is offered. The basic tool of analysis consists of a zero-dimensional (0-D) time-dependent plasma power balance code which incorporates the most advanced data base and models in transport and burn plasma physics relevant to tokamaks. Because the plasma power balance is dominated by the transport loss and given the large uncertainty in the confinement model, the authors have studied the problem for a wide range of energy confinement scalings. The results of this analysis form the basis for studying the temporal behavior of the plasma under various thermal control mechanisms. Scenarios of thermally stable full and fractional power operations have been determined for a variety of transport models, with either passive or active feedback burn control. Important power control parameters, such as gas fueling rate, auxiliary power and other plasma quantities that affect transport losses, have also been identified. The results of these studies vary with the individual transport scaling used and, in particular, with respect to the effect of alpha heating power on confinement

  9. Method of controlling the reactor operation

    International Nuclear Information System (INIS)

    Ishiguro, Akira; Nakakura, Hiroyuki.

    1987-01-01

    Purpose: To moderate vibratory response due to delayed operation thereby obtain stable controlled response in the operation control for a PWR type reactor. Method: the reactor operation is controlled by the axial power distribution control by regulating the boron concentration in primary coolants with a boron density control system and controlling the average temperature for the primary coolants with the control rod control system. In this case, the control operation and the control response become instable due to transmission delay, etc. of aqueous boric acid injection to the primary coolant circuits to result in vibratory response. In the present invention, signals are prepared by adding the amount in proportion to the variation coefficient with time of xenone concentration obtained from the measured value for the reactor power added to the conventional axial power distribution parameter deviation and used as the input signals for the boron concentration control system. As a result, the instability due to the transmission delay of the aqueous boric acid injection is improved by the preceding control by the amount in proportion with the variation coefficient with time of the xenone concentration. An advantageous effect can be expected for the load following operation during day time according to the present invention. (Kamimura, M.)

  10. Safety report for the Independent CO{sub 2} loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Vol. VI; Album VI: Izvestaj o sigurnosti za nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u VEK reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-07-01

    First part of the safety report for the Independent CO{sub 2} loop for cooling the samples irradiated in the RA reactor vertical experimental channels contains descriptions of the independent CO{sub 2} loop, system for regulation, measurement and control od the loop parameters, description of the dosimetry system, and the plan for testing the experimental device before start-up. Second part of this analysis describes the influence of of the experimental device on the reactor operation under steady state conditions as follows: influence of the head of the independent coolant loop on the reactivity of the reactor core and influence on the reactor temperature coefficient. Third part of the report includes the analysis of possible accidents during operation of the independent CO{sub 2} coolant loop in the reactor. Izvestaj o sigurnosti za nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u VEK reaktora RA sadrzi u prvom delu: opis nezavisnog kola CO{sub 2}, sistema za regulaciju, merenje i kontrolu parametara nezavisnog kola, sistema dozimetrijske kontrole i plan ispitivanja eksperimentalnih uredjaja pre pustanja u rad. Drugi deo ove analize obuhvata uticaj eksperimentalnog uredjaja na reaktor u normalnom rezimu rada i to: uticaj glave petlje nezavisnog kola CO{sub 2} za hladjenje uzoraka na reaktivnost reaktora i uticaj uredjaja na temperaturni koeficijent reaktora. Treci deo sadrzi analizu mogucih akcidenata u toku rada nezavisnog kola CO{sub 2} u reaktoru.

  11. 1984 Operation of the high flux reactor

    International Nuclear Information System (INIS)

    1985-01-01

    The programme resources in 1984 were largely devoted to the replacement of the old reactor vessel and its peripheral equipment. The original vessel had been in operation for more than 20 years and doubts had arisen about the condition of the aluminium tank after so long an exposure to neutrons. The operation, which had never been attempted before on a reactor of that size and complexity was planned and prepared over a number of years to take advantage of the occasion to provide a much improved vessel, incorporating the latest design features. The plant was shut down at the end of November 1983 and the 14 months operation began with a short cooling-off period for decay of short lived radioactivity followed by removal of the old tank and its dissection into pieces convenient for consolidation and storage as radioactive waste. After decontamination of the shielding pool, the new vessel and neutron beam tubes were installed and the reactor was recommissioned. Routine 45 MW operation was resumed on 14 February 1985 and has been uneventful since then

  12. Work related to increasing the exploitation and experimental possibilities of the RA reactor, 05. Independent CO2 loop for cooling the samples irradiated in the RA vertical experimental channels (I-IV), Part II, IZ-240-0379-1963, Vol. II Head of the low temperature RA reactor coolant loop

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1963-07-01

    The objective of the project was to design the head of the CO 2 coolant loop for cooling the materials during irradiation in the RA reactor. Six heads of coolant loops will be placed in the RA reactor, two in the region of heavy water in the experimental channels VEK-6 and four in the graphite reflector in the channels VEK-G. maximum generated heat in the heads of the coolant loop is 10500 kcal/h and minimum generated heat is 1500 kcal/h. The loops are cooled by CO 2 gas, coolant flow is 420 kg/h, and the pressure is 4.5 atu. There is a need to design and construct the secondary coolant loop for the low temperature coolant loop. This volume includes technical specifications of the secondary CO 2 loop with instructions for construction and testing; needed calculations; specification of materials; cost estimation for materials, equipment and construction; and graphical documentation [sr

  13. Work related to increasing the exploitation and experimental possibilities of the RA reactor, 05. Independent CO2 loop for cooling the samples irradiated in the RA vertical experimental channels (IIV), Part I, IZ-240-o379-1963, Vol. I, Head of the low temperature RA reactor coolant loop

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1963-07-01

    The objective of the project was to design the head of the CO 2 coolant loop for cooling the materials during irradiation in the RA reactor. Six heads of coolant loops will be placed in the RA reactor, two in the region of heavy water in the experimental channels VEK-6 and four in the graphite reflector in the channels VEK-G. Materials for irradiation are metallurgy and chemical samples. In addition to the project objectives, this volume includes technical specifications of the coolant loop head, thermal calculations, calculations of mechanical stress, antireactivity and activation of the construction materials, cost estimation, scheme of the coolant loop head, diagrams of CO 2 gas temperature, thermal neutron flux distribution, design specifications of two proposed solutions for head of low temperature coolant loop [sr

  14. Safe operation and maintenance of research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Munsorn, S. [Reactor Operation Division, Office of Atomic Energy for Peace, Chatuchak, Bangkok (Thailand)

    1999-10-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U{sub 3}O{sub 8}- Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  15. Safe operation and maintenance of research reactor

    International Nuclear Information System (INIS)

    Munsorn, S.

    1999-01-01

    The first Thai Research Reactor (TRR-1) was established in 1961 at the Office of Atomic Energy for Peace (OAEP), Bangkok. The reactor was light water moderated and cooled, using HEU plate-type with U 3 O 8 - Al fuel meat and swimming pool type. The reactor went first critical on October 27, 1962 and had been licensed to operate at 1 MW (thermal). On June 30, 1975 the reactor was shutdown for modification and the core and control system was disassemble and replaced by that of TRIGA Mark III type while the pool cooling system, irradiation facilities and other were kept. Thus the name TRR-1/M1' has been designed due to this modification the fuel has been changed from HEU plate type to Uranium Zirconium Hydride (UZrH) Low Enrichment Uranium (LEU) which include 4 Fuel Follower Control Rods and 1 Air Follower Control Rod. The TRR-1/M1 went critical on November 7, 1977 and the purpose of the operation are training, isotope production and research. Nowadays the TRR-1/M1 has been operated with core loading No.12 which released power of 1,056 MWD. (as of October 1998). The TRR-1/M1 has been operated at the power of 1.2 MW, three days a week with 34 hours per week, Shut-down on Monday for weekly maintenance and Tuesday for special experiment. The everage energy released is about 40.8 MW-hour per week. Every year, the TRR-1/M1 is shut-down about 2 months between February to March for yearly maintenance. (author)

  16. Operating reactors licensing actions summary. Vol.4, No. 4

    International Nuclear Information System (INIS)

    1984-06-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors

  17. Research reactors in Argentina

    International Nuclear Information System (INIS)

    Carlos Ruben Calabrese

    1999-01-01

    Argentine Nuclear Development started in early fifties. In 1957, it was decided to built the first a research reactor. RA-1 reactor (120 kw, today licensed to work at 40 kW) started operation in January 1958. Originally RA-1 was an Argonaut (American design) reactor. In early sixties, the RA-1 core was changed. Fuel rods (20% enrichment) was introduced instead the old Argonaut core design. For that reason, a critical facility named RA-0 was built. After that, the RA-3 project started, to build a multipurpose 5 MW nuclear reactor MTR pool type, to produce radioisotopes and research. For that reason and to define the characteristics of the RA-3 core, another critical facility was built, RA-2. Initially RA-3 was a 90 % enriched fuel reactor, and started operation in 1967. When Atucha I NPP project started, a German design Power Reactor, a small homogeneous reactor was donated by the German Government to Argentina (1969). This was RA-4 reactor (20% enrichment, 1W). In 1982, RA-6 pool reactor achieved criticality. This is a 500 kW reactor with 90% enriched MTR fuel elements. In 1990, RA-3 started to operate fueled by 20% enriched fuel. In 1997, the RA-8 (multipurpose critical facility located at Pilcaniyeu) started to operate. RA-3 reactor is the most important CNEA reactor for Argentine Research Reactors development. It is the first in a succession of Argentine MTR reactors built by CNEA (and INVAP SE ) in Argentina and other countries: RA-6 (500 kW, Bariloche-Argentina), RP-10 (10MW, Peru), NUR (500 kW, Algeria), MPR (22 MW, Egypt). The experience of Argentinian industry permits to compete with foreign developed countries as supplier of research reactors. Today, CNEA has six research reactors whose activities have a range from education and promotion of nuclear activity, to radioisotope production. For more than forty years, Argentine Research Reactors are working. The experience of Argentine is important, and argentine firms are able to compete in the design and

  18. Investigation of the heavy water distillation system at the RA reactor

    International Nuclear Information System (INIS)

    Zecevic, V.; Badrljica, R.

    1963-01-01

    The heavy water distillation system was tested because this was not done before the reactor start-up. Detailed inspection of the system components showed satisfactory results. Leak testing was done as well as the testing of the instrumentation which enables reliable performance of the system. Performance testing was done with ordinary water and later 2700 l of heavy water from the reactor was purified, decreasing the activity by 45%

  19. Operator Support System for Pressurized Water Reactor

    International Nuclear Information System (INIS)

    Wei Renjie; Shen Shifei

    1996-01-01

    Operator Support System for Pressurized Water Reactor (OSSPWR) has been developed under the sponsorship of IAEA from August 1994. The project is being carried out by the Department of Engineering Physics, Tsinghua University, Beijing, China. The Design concepts of the operator support functions have been established. The prototype systems of OSSPWR has been developed as well. The primary goal of the project is to create an advanced operator support system by applying new technologies such as artificial intelligence (AI) techniques, advanced communication technologies, etc. Recently, the advanced man-machine interface for nuclear power plant operators has been developed. It is connected to the modern computer systems and utilizes new high performance graphic displays. (author). 6 refs, 4 figs

  20. Review of Operation and Maintenance Support Systems for Research Reactors

    International Nuclear Information System (INIS)

    Jin, Kyungho; Heo, Gyunyoung; Park, Jaekwan

    2014-01-01

    Operation support systems do not directly control the plant but it can aid decision making itself by obtaining and analyzing large amounts of data. Recently, the demand of research reactor is growing and the need for operation support systems is increasing, but it has not been applied for research reactors. This study analyzes operation and maintenance support systems of NPPs and suggests appropriate systems for research reactors based on analysis. In this paper, operation support systems for research reactors are suggested by comparing with those of power reactors. Currently, research reactors do not cover special systems in order to improve safety and operability in comparison with power reactors. Therefore we expect to improve worth to use by introducing appropriate systems for research reactors. In further research, we will develop an appropriate system such as applications or tools that can be applied to the research reactor

  1. Study on the technical feasibility of Fission-Track dating at two irradiation positions of the RA-6 research reactor

    International Nuclear Information System (INIS)

    Dorval, Eric

    2005-01-01

    The method of Fission-Track dating is based upon the detection of the damage caused by fission fragments from the Uranium contained in geological samples.In order to determine the age of a sample, both the amount of spontaneous fissions occurred and the Uranium concentration must be known.The latter requires the irradiation of the samples inside a reactor with a well-thermalized flux, so that fissions are induced over 235 U targets only. Therefore, the Uranium concentration may be determined.The main inconvenient presented by the irradiation sites at the RA-6 MTR-type reactor is that neutron flux is not completely thermal there, which means that fissions due to epithermal and fast neutrons will not be negligible.In the same way, tracks due to fissions of 238 U and 232 Th will be detected. In order to know the corrections that must be applied to those measurements performed in this reactor, it is necessary to characterize fast flux.Because of it, this laboratory's gamma spectrometry equipment had to be calibrated. After that, several activation detectors were irradiated and results were analyzed. Finally, it was determined that it is feasible to Fission-Track date at the I6 position. However, limitations associated to this method were analyzed for the values of flux measured in the different sites

  2. Reactor operations for nuclear pumping of lasers

    Energy Technology Data Exchange (ETDEWEB)

    Beck, G; Cooper, G [University of Illinois (United States)

    1974-07-01

    Experiments involving the measurement of gas parameters that are related to lasing, and lasing of various gas mixtures have comprised a major part of the utilization of the University of Illinois Advanced TRIGA Reactor since the upgrading of the facility was completed in 1969. A thru beam port, which was added during upgrading, has been the facility used for these measurements. The laser cell is placed in the port adjacent to the core. Alignment is then accomplished by using both ends of the port or by a mirror placed at the back side of the apparatus. The reactor has been operated in all modes (pulsing, square wave, and steady state) for the experiments although pulsing is the primary mode that is used. Laser enhancement has been obtained in several cases, but efforts toward direct pumping from the radiation alone have not as yet succeeded. Improved laser operation from direct pumping has been suggested with an emphasis on high-powered systems where the basic input energy is to be derived from a nuclear reactor.

  3. Fast reactor operation in the United States

    International Nuclear Information System (INIS)

    Smith, R.R.; Cissel, D.W.

    1978-01-01

    Of the many American facilities dedicated to fast reactor technology, six qualify as liquid-metal-cooled fast reactors. All of these satisfy the following criteria: an unmoderated neutron spectrum, highly enriched fuel material, substantial heat production, and the use of a liquid metal coolant. These include the following: EBR-I Clementine, LAMPRE, EBR-II, EFFBR, and SEFOR. Collectively, these facilities encompassed all of the more important features of liquid-metal-cooled fast reactor technology. Coolant types ranged from mercury in Clementine, to NaK in EBR-I, and sodium in the others. Fuels included enriched-uranium metallic alloys in EBR-I, EBR-II, and EFFBR; metallic plutonium in Clementine; molten plutonium alloy in LAMPRE; and a mixed UO 2 -PuO 2 ceramic in SEFOR. Heat removal techniques ranged from air-blast cooling in LAMPRE and SEFOR; steam-electrical generation in EBR-I, EBR-II, and EFFBR; to a mercury-to-water heat dump in Clementine. Operational experience with such diverse systems has contributed heavily to the U.S. Each of the six systems is described from the viewpoints of purpose, history, design, and operation. Attempts are made to limit descriptive material to the most important features and to refer the reader to a few select references if additional information is needed

  4. Control of water chemistry in operating reactors

    International Nuclear Information System (INIS)

    Riess, R.

    1997-01-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ''modified'' B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs

  5. Control of water chemistry in operating reactors

    Energy Technology Data Exchange (ETDEWEB)

    Riess, R [Siemens AG Unternehmensbereich KWU, Erlangen (Germany)

    1997-02-01

    Water chemistry plays a major role in fuel cladding corrosion and hydriding. Although a full understanding of all mechanisms involved in cladding corrosion does not exist, controlling the water chemistry has achieved quite some progress in recent years. As an example, in PWRs the activity transport is controlled by operating the coolant under higher pH-values (i.e. the ``modified`` B/Li-Chemistry). On the other hand, the lithium concentration is limited to a maximum value of 2 ppm in order to avoid an acceleration of the fuel cladding corrosion. In BWR plants, for example, the industry has learned on how to limit the copper concentration in the feedwater in order to limit CILC (Copper Induced Localized Corrosion) on the fuel cladding. However, economic pressures are leading to more rigorous operating conditions in power reactors. Fuel burnups are to be increased, higher efficiencies are to be achieved, by running at higher temperatures, plant lifetimes are to be extended. In summary, this paper will describe the state of the art in controlling water chemistry in operating reactors and it will give an outlook on potential problems that will arise when going to more severe operating conditions. (author). 3 figs, 6 tabs.

  6. Linguistic Formalism for Semi-Autonomous Reactor Operation

    International Nuclear Information System (INIS)

    Joo, Sungmoon; Seo, Sang Mun; Suh, Yong-Suk; Park, Cheol

    2017-01-01

    The ultimate goal of our work is to develop a novel, integrated system for semi-autonomous reactor operation by introducing an interfacing language shared by human reactor operators and artificially intelligent service agents (e.g., robots). We envision that human operators and artificially intelligent service agents operate the reactor cooperatively in the future. For example, an artificially intelligent service agent carries out a human reactor operator's command or reports the result of a task commanded by the human reactor operator. This work presents preliminary work towards a unified linguistic formalism for cooperative, semiautonomous reactor operation. Application of the proposed formalism to reactor operator communication domain shows that the formalism effectively captures the syntax and semantics of the domain-specific language defined by the communication protocol.

  7. Operation and utilizations of Dalat nuclear research reactor

    International Nuclear Information System (INIS)

    Hien, P.Z.

    1988-01-01

    The reconstructed Dalat nuclear research reactor was commissioned in March 1984 and up to September 1988 more than 6200 hours of operation at nominal power have been recorded. The major utilizations of the reactor include radioisotope production, activation analysis, nuclear data research and training. A brief review of the utilizations of the reactor is presented. Some aspects of reactor safety are also discussed. (author)

  8. Safety evaluation of the Dalat research reactor operation

    International Nuclear Information System (INIS)

    Long, V.H.; Lam, P.V.; An, T.K.

    1989-01-01

    After an introduction presenting the essential characteristics of the Dalat Nuclear Research Reactor, the document presents i) The safety assurance condition of the reactor, ii) Its safety behaviour after 5 years of operation, iii) Safety research being realized on the reactor. Following is questionnaire of safety evaluation and a list of attachments, which concern the reactor

  9. Devices for irradiation of materials in the fast neutron flux at the RA heavy water reactor in Vinca; Uredjaji za ozracivanje materijala u fluksu brzih neutrona na teskovodnom reaktoru RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institut za nuklearne nauke Boris Kidric, Vinca, Beograd (Yugoslavia)

    1964-07-01

    Full text: This paper covers the concept, technical description and problems of constructing special experimental facilities at the RA reactor in Vinca. During 1962, construction materials (graphite, Mg, Al-oxides, steel and Zircaloy) were irradiated in these facilities at temperatures below 100 deg C by the integral fast neutron flux of 2 10{sup 20} n/cm{sup 2}. Temperature of the samples cooled by heavy water circulating through hollow uranium elements was measured by thermocouples. Construction of the facility, sample preparation, related measurements of the flux and irradiation of the samples were done in cooperation with the Nuclear center in Saclay, France. A short review of the experiences in using the new experimental space at the RA reactor is given, together with some problems related to transport of radioactive capsules containing samples from Vinca to Saclay.

  10. Activities of the Service for maintenance of the RA reactor electronic equipment in 1979 - Report - Annex IV; Prilog IV Rad sluzbe za odrzavanje elektronske opreme reaktora RA u 1979. godini - Izvestaj -

    Energy Technology Data Exchange (ETDEWEB)

    Milosevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1979-12-15

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system. [Serbo-Croat] U okviru organizacione seme OOUR nuklearni reaktor RA sluzba za odrzavanje instrumentacije postrojenja ima sledece zadatke: odrzavanje postojece elektronske opreme; ucesce u planiranju eksperimenata i priprema elektronske opreme; nabavka nove opreme, rezervnih delova i komponenti; rad na izradi elektronske opreme i uredjaja za sopstvene potrebe i izrada projekata u domenu reaktorske opreme i ucesce u ugradnji nove opreme. Osnovna instrumentacija postrojenja obuhvata: sistem za upravljanje i zastitu, sistem za tehnolosku kontrolu i sistem za dozimetrijsku kontrolu.

  11. Analysis of accident caused by temperature increase at the RA reactor in Vinca

    International Nuclear Information System (INIS)

    Afgan, N; Kulundzic, P.

    1964-06-01

    The objective of this work was to determine the maximum time interval without accident due to mechanical failures. The following accidents caused by mechanical failures are taken into account: loss of moderator flow, moderator leaking with or without circulation, and accidents caused by removal of fuel channels from the reactor vessel. Obtained numerical and experimental results are presented. Experimental device installed at the reactor was used for verification of calculation results. The analysis was done for the most damaging conditions and thus the obtained results represent the lowest boundary values [sr

  12. Operating reactors licensing actions summary. Vol. 3, No. 3

    International Nuclear Information System (INIS)

    1983-04-01

    The operating reactors licensing actions summary is designed to provide the management of the Nuclear Regularory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Management and Program Analysis. This summary report is published primarily for internal NRC use in managing the operating reactors licensing actions program

  13. Operating reactors licensing actions summary. Volume 5, No. 2

    International Nuclear Information System (INIS)

    1985-04-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management. This summary report is published primarily for internal NRC use in managing the Operating Reactors Licensing Actions Program

  14. Annex 7 - Task 08/32 final report, Diffusion bond between the fuel and cladding of the RA reactor fuel element; Prilog 7 - Zavrsni izvestaj o podzadatku 08/32, Difuziona veza goriva i kosuljice gorivnog elementa reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Kustudic, D [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1961-12-15

    Based on testing the diffusin bond between the fuel and the aluminium cladding of the RA reactor fuel element it was found that the diffusion bond exists; uranium is protected by a nickel layer to prevent the damaging diffusion between uranium and aluminium; the nickel layer is about 5 microns thick. Under assumption that the diffusion annealing was done after cladding the annealing temperature was about 500 deg C for about 1 hour.

  15. Communication and computer technologies for teaching physics in nuclear reactors

    International Nuclear Information System (INIS)

    Murua, C; Chautemps, A; Odetto, J; Keil, W; Trivino, S; Rossi, F; Perez Lucero, A

    2012-01-01

    In order to train personnel inn order to train personnel in Embalse Nuclear Power Plant, and provided that such training given primarily on the location of such a facility, we designed a pedagogical strategy that combined the use of conventional resources with new information technologies. Since the Nuclear Reactor RA-0 is an ideal tool for teaching Reactor Physics, priority was the use of it, both locally remotely. The teaching strategy is based on four pillar: -Lectures on the Power Plant (using a virtual classroom to support); -Remote monitoring of Ra-0 Nuclear Reactor parameters while operating (RA0REMOTO); -Use, through the Internet, of the Ra-0 Nuclear Reactor Simulator (RA0SIMUL); -Made in the Nuclear Reactor RA-0 of Reactor Physics practical. The work emphasizes RA0REMOTO and RA0SIMUL systems. The RA0REMOTO system is an appendix of the Electronic Data Acquisition System (SEAD) of the Nuclear Reactor RA-0. This system acquires signals from Reactor instrumentation and sends them to a server running the software that 'publish' the reactor parameters on the internet. Students may, during the lectures, monitor any parameter of the reactor while it operates, which allows teachers to compare theory with reality. RA0SIMUL is a simulator on the RA-0, which allows students to 'operate' a reactor analyzing the underlying physics concepts (author)

  16. Analysis of psychological tests of the personnel employed at the RA research reactor

    International Nuclear Information System (INIS)

    Babic, S.

    1993-05-01

    The greatest nuclear accident in the history, the Chernobyl accident, had strong influence on international nuclear safety regulations. Though human error, as factor of risk, was never completely neglected but now it takes careful consideration, from design to man power. The situation in our country and results of psychological tests of occupational exposed persons in research reactor are discussed (author) [sr

  17. Twenty years of health physics research reactor operation

    International Nuclear Information System (INIS)

    Sims, C.S.; Gilley, L.W.

    1983-01-01

    The Health Physics Research Reactor at the Oak Ridge National Laboratory has been in regular use for more than two decades. Safe operation of this fast reactor over this extended period indicates that (1) fundamental design, (2) operational procedures, (3) operator training and performance, (4) maintenance activites, and (5) management have all been eminently satisfactory. The reactor and its uses are described, the operational history and significant events are reviewed, and operational improvements and maintenance are discussed

  18. Research about reactor operator's personality characteristics and performance

    International Nuclear Information System (INIS)

    Wei Li; He Xuhong; Zhao Bingquan

    2003-01-01

    To predict and evaluate the reactor operator's performance by personality characteristics is an important part of reactor operator safety assessment. Using related psychological theory combined with the Chinese operator's fact and considering the effect of environmental factors to personality analysis, paper does the research about the about the relationships between reactor operator's performance and personality characteristics, and offers the reference for operator's selection, using and performance in the future. (author)

  19. RA-3 reactor core with uranium silicide fuel elements P-07 type

    International Nuclear Information System (INIS)

    Abbate, Maximo J.; Sbaffoni, Maria M.

    2003-01-01

    Following the studies on the utilization of fuel elements (FE) containing uranium silicide, core of the RA-3 was analyzed with several calculation models. At first, the present situation, i.e. the core charged with normal FE (U 3 O 8 ), has been analyzed to validate the simulation methodology comparing with experimental results and to establish reference data to 5 and 10 MW able to be compared with future new situations. Also, CITVAP's nuclear data libraries to be used in irradiation experiment planning were completed. The results were satisfactory and were applied to the study of the core containing P-07 FE [U 3 Si 2 ], in face of a future core change. Comparing with the performance of the U 3 O 8 FE, the silicides ones show the following advantages: - average burnup: 45 % greater; -extraction burnup increase 12 %; and, -the residence time [in full power days] could be a 117 % greater. (author)

  20. Operating experiences at the Finnish TRIGA reactor

    International Nuclear Information System (INIS)

    Salmenhaara, Seppo

    1988-01-01

    The Finnish TRIGA reactor has been in operation since March 1962. There are still 57 original Al-clad fuel elements in the core. So far we have had only two fuel cladding failures in 1981 and 1988. The first one was an Al-clad element and the second one a SS-clad. The low rate of fuel cladding failures has made it possible to use continuously also the Al-clad fuel elements. Although some conventional irradiations of certain type have been repeated successfully tens of times, new and unexpected incidents can still take place. As an example an event of a leaking irradiation capsule is described

  1. Lessons from feedback of safety operating experience for reactor physics

    International Nuclear Information System (INIS)

    Suchomel, J.; Rapavy, S.

    1999-01-01

    Analyses of events in WWER operations as a part of safety experience feedback provide a valuable source of lessons for reactor physics. Examples of events from Bohunice operation will be shown such as events with inadequate approach to criticality, positive reactivity insertions, expulsion of a control rod from shut-down reactor, problems with reactor protection system and control rods. (Authors)

  2. Operating reactors licensing actions summary. Volume 5, No. 7

    International Nuclear Information System (INIS)

    1985-09-01

    The Operating Reactors Licensing Actions Summary is designed to provide the management of the Nuclear Regulatory Commission (NRC) with an overview of licensing actions dealing with operating power and nonpower reactors. These reports utilize data collected from the Division of Licensing in the Office of Nuclear Reactor Regulation and are prepared by the Office of Resource Management

  3. Operational methods of the fluidized bed nuclear reactor

    International Nuclear Information System (INIS)

    Borges, V.; Sefidvash, F.

    1993-01-01

    The operational curve of reactivity as a function of porosity of the Fluidized Bed Nuclear Reactor is presented. The strategies for start-up, shut-down and maintaining the reactor critical during operation are described. The inherent safety of the reactor from neutronic point of view under steady state condition is demonstrated. (author)

  4. Temperature measurement of the reactor materials samples irradiated in the fuel channels of the RA reactor - Annex 16

    International Nuclear Information System (INIS)

    Nikolic, M.; Djalovic, M.

    1964-01-01

    Reactor materials as graphite, stainless steel, magnox, zirconium alloys, etc. were exposed to fast neutron flux inside the fuel elements specially adapted for this purpose. Samples in the form ampoules were placed in capsules inside the fuel channels and cooled by heavy water which cools the fuel elements. In order to monitor the samples temperature 42 thermocouples were placed in the samples. That was necessary for reactor safety reasons and for further interpretation of measured results. Temperature monitoring was done continuously by multichannel milivoltmeters. This paper describes the technique of introducing the thermocouples, compensation instruments, control of the cold ends and adaptation of the instruments for precision (0.5%) temperature measurement in the range 30 deg - 130 deg C; 30 deg - 280 deg C and 30 deg - 80 deg C [sr

  5. Radiation protection at the RA Reactor in 1985, Part -2, Annex 1, Radioactivity control of working environment, dosimetry

    International Nuclear Information System (INIS)

    Ninkovic, M.; Bjelanovic, J.; Minincic, Z.; Komatina, R.; Raicevic, J.

    1985-01-01

    This report contains data and analysis of the of measured sample results collected during radiation protection control in the working environment of the RA reactor. First part contains basic exposure values and statistical review of the the total number of radiation measurements. It includes contents of radioactive gasses and effluents in the air, as well as the level of surface contamination of clothes and uncovered parts of the personnel bodies. Second part deals with the analysis of personnel doses. It was found that the maximum individual dose from external irradiation amounted to 8.2 mSV during past 10 months. Individual exposures for 7/10 of the personnel were less than 1/10 of the annual permissible exposure. Data are compared to radiation doses for last year and previous five years. Third part of this annex contains basic data about the quantity of collected radioactive waste, total quantity of contaminated and decontaminated surfaces. The last part analyzes accidents occurred at the reactor during 1985. It was found that there have been no accidents that could cause significant contamination of working surfaces and components nor radiation exposure of the personnel [sr

  6. Fuel failure detection in operating reactors

    International Nuclear Information System (INIS)

    Seigel, B.; Hagen, H.H.

    1977-12-01

    Activity detectors in commercial BWRs and PWRs are examined to determine their capability to detect a small number of fuel rod failures during reactor operation. The off-gas system radiation monitor in a BWR and the letdown line radiation monitor in a PWR are calculated to have this capability, and events are cited that support this analysis. Other common detectors are found to be insensitive to small numbers of fuel failures. While adequate detectors exist for normal and transient operation, those detectors would not perform rapidly enough to be useful during accidents; in most accidents, however, primary system sensors (pressure, temperature, level) would provide adequate warning. Advanced methods of fuel failure detection are mentioned

  7. Self operation type reactor scram device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1992-01-01

    A control rod having neutron absorbers therein is held by a curie point electromagnet by way of a control rod extension shaft. The electromagnet is suspended from a vertically movable driving shaft in an upper guide tube. Then, a heater is disposed at the lower portion in the inner side of the upper guide tube. Upon a function confirmation test, the electromagnet is at first pulled up to the inside of the upper guide tube. Subsequently, the electromagnet is heated by the heater by a temperature higher than the curie point of the temperature sensing magnetic material. If the function is normal, armature connected to the control rod extension tube is separated. With such a constitution, the electromagnetic portion is isolated from a coolant main stream, thereby enabling to avoid the cooling effect by the stream of coolants. Accordingly, the operation test for confirming the integrity of the function of the curie point electromagnet can be conducted while placing the electromagnet in the reactor core as it is during actual reactor operation. (I.N.)

  8. Self operation type reactor control device

    International Nuclear Information System (INIS)

    Saito, Makoto; Gunji, Minoru.

    1990-01-01

    A boiling-requefication chamber containing transporting materials having somewhat higher boiling point that the usual reactor operation temperature and liquid neutron absorbers having a boiling point sufficiently higher than that of the transporting materials is disposed near the coolant exit of a fuel assembly and connected with a tubular chamber in the reactor core with a moving pipe at the bottom. Since the transporting materials in the boiling-requefication chamber is boiled and expanded by heating, the liquid neutron absorbers are introduced passing through the moving pipe into the cylindrical chamber to control the nuclear reactions. When the temperature is lowered by the control, the transporting materials are liquefied to contract the volume and the liquid neutron absorbers in the cylindrical chamber are returned passing through the moving tube into the boiling-liquefication chamber to make the nuclear reaction vigorous. Thus, self-operation type power conditioning and power stopping are enabled not by way of control rods and not requiring external control, to prevent scram failure or misoperation. (N.H.)

  9. BWR type reactor and its operating method

    International Nuclear Information System (INIS)

    Ootsuji, Niro.

    1983-01-01

    Purpose: To regulate the control rod extraction operation such that an assumed control rod drop accident, if should occur, may not lead to further serious accidents, as well as enable to improve the working life of the control rod. Method: A plurality of control rods disposed among a plurality of fuel assemblies constituting the reactor core for suppressing the reactor core reactivity are divided into two groups depending on the descending speed, and the number of rods with a faster descending speed is set to less than 1/4 of the total number of the control rods. Then, the control rods are arranged such that those rods of the faster descending speed may be set every one another in any of the vertical, lateral and orthogonal directions. Further, it is always judged as to the possibility of extracting the control rods with the faster descending speed by a fast control rod extraction judging circuit to issue a signal to a control rod extraction inhibition circuit, so that the extraction operation for the control rods with the faster descending speed is started after all of the control rods with the slow descending speed have been extracted. Accordingly, if a control rod dropping accident should occur, abrupt power change can be avoided to thereby minimize the development of the accident. (Horiuchi, T.)

  10. Regulation for installation and operation of marine reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The regulation is defined under the law for the regulations of nuclear source materials, nuclear fuel materials and reactors and the provisions of the order for execution of the law. The regulation is applied to marine reactors and reactors installed in foreign nuclear ships. Basic concepts and terms are explained, such as: radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; safeguarded area; inspected surrounding area and employee. The application for permission of installation of reactors shall list maximum continuous thermal power, location and general structure of reactor facilities, structure and equipment of reactors and treatment and storage facilities of nuclear fuel materials, etc. The application for permission of reactors installed in foreign ships shall describe specified matters according to the provisions for domestic reactors. The operation program of reactors for three years shall be filed to the Minister of Transportation for each reactor every fiscal year from that year when the operation is expected to start. Records shall be made for each reactor and kept for particular periods on inspection of reactor facilities, operation, fuel assembly, control of radiation, maintenance and others. Exposure doses, inspection and check up of reactor facilities, operation of reactors, transport and storage of nuclear fuel materials, etc. are designated in detail. (Okada, K.)

  11. Study of the modifications on the synchronous generators, heavy water pumps and condenser batteries of the RA reactor - Annex 17

    International Nuclear Information System (INIS)

    Milosevic, M.

    1964-01-01

    Modifications done on the synchronous generators are related to the emergency power supply system, meaning one of the most important devices responsible for reactor safety. Without reducing the efficiency of the heavy water pumps the improved stability of generators operation was achieved by reducing the possibility of errors and simplifying manipulation. Condensator batteries were improved in order to decrease the leakage currents

  12. Independent CO{sub 2} loop for cooling the samples irradiated in the RA reactor vertical experimental channels, Task 2.50.05; Nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u vertikalnim eksperimentalnim kanalima reaktora RA, Zad. 2.50.05

    Energy Technology Data Exchange (ETDEWEB)

    Stojic, M; Pavicevic, M

    1964-07-01

    This report contains the following volumes V and VI of the Project 'Independent CO{sub 2} loop for cooling the samples irradiated in RA reactor vertical experimental channels': Design project of the dosimetry control system in the independent CO{sub 2} loop for cooling the samples irradiated in the RA reactor vertical experimental channels, and Safety report for the Independent CO{sub 2} loop for cooling the samples irradiated in the RA reactor vertical experimental channels. Ovaj izvestaj sadrzi dva albuma zadatka 'Nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u vertikalnim eksperimentalnim kanalima reaktora RA', Zad. 2.50.05: Album V: Predprojekat sistema dozimetrijske kontrole u nezavisnom kolu CO{sub 2} za hladjenje uzoraka ozracivanih u VEK reaktora RA i Album VI: Izvestaj o sigurnosti za nezavisno kolo CO{sub 2} za hladjenje uzoraka ozracivanih u VEK reaktora RA.

  13. Radiation protection at the RA Reactor in 1986, Part -2, Annex 2a, Radioactivity control of the RA reactor environment (atmospheric precipitations, dust, water, soil, plants, fruit...); Deo 2 - Prilog 2a - Kontrola radioaktivnosti okoline nuklearnog reaktora RA (padavine i slobodno natalozena prasina, vode, zemljiste, rastinje, voce...)

    Energy Technology Data Exchange (ETDEWEB)

    Ajdacic, N; Martic, M; Jovanovic, J [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1986-12-01

    Control of radioactivity in the biosphere in the vicinity of the RA reactor is part of the radioactivity control done regularly for the whole territory of the Vinca institute (report by the same authors included in this Annex). During 1986 control was conducted according to the plan until May 1, 1986 when a dramatic increase of the precipitations and all other samples from the biosphere was recorded. According to the measured data no significant changes have been found in the surroundings of the RA reactor, until April 29 1986. Since then more detailed control was conducted, the number of samples was increased, apart from standard measuring procedure of total beta activity measurements, gamma spectrometry of all samples was applied. High activity level of the following nuclides was found: Iodine, cerium,cesium, tellurium, ruthenium, barium, lanthanum, etc. As an example activity of ?1?3?1 I in one sample was 564{+-}5 kBq/m{sup 2}. [Serbo-Croat] Kontrola radioaktivnosti biosfere u okolini reaktora RA je deo kontrole radioaktivnosti koja se redovno vrsi za celokupnu teritoriju Instituta Vinca (izvestaj istih autora ukljucen je u ovaj Prilog). Tokom 1986. kontrola je ostvarivana prema planu do 1. maja 1986, kada je registrovano drasticano povecanje aktivnosti padavina i ostalih uzoraka biosfere. Prema rezultatima merenja, nisu registrovana znacajnija odstupanja u okolini reaktora RA sve do 29. aprila 1986. Od tada se vrse detaljnija merenja, broj uzoraka je uvecan, pored standardno primenjivane metode primenom merenja totalne beta aktivnosti uzoraka, svi uzorci su analizirani gama spektrometrijski. Enormno visoka kontaminacija uzoraka posle gamma spektrometrije pokazala je prisustvo aktivacionih i fisionih radionuklida medju kojima su bili: jod, cerijum, cesijum, rutenijum, barium lantan i drugi. Tako je na primer samo aktivnost I-133 iznosila 564{+-}5 kBq/m{sup 2}.

  14. Analysis of neutron flux increase in the horizontal experimental channels of Ra reactor - masters thesis

    International Nuclear Information System (INIS)

    Strugar, P.

    1964-12-01

    Calculation and experimental results shown in this paper show that higher thermal neutron flux is obtained in the reactor core with central horizontal reflector at the same power level. The flux is increased when the moderation capability of the core is decreased. Apart from increase of the thermal component of the neutron flux in the experimental channels, the central reflector causes decrease of the epithermal neutron flux and gamma radiation intensity. This is very useful for studying (n, γ) reaction, neutron diffraction, etc. [sr

  15. Operation and maintenance of 1MW PUSPATI TRIGA reactor

    International Nuclear Information System (INIS)

    Adnan Bokhari; Mohammad Suhaimi Kassim

    2006-01-01

    The Malaysian Research Reactor, Reactor TRIGA PUSPATI (RTP) has been successfully operated for 22 years for various experiments. Since its commissioning in June 1982 until December 2004, the 1MW pool-type reactor has accumulated more than 21143 hours of operation, corresponding to cumulative thermal energy release of about 14083 MW-hours. The reactor is currently in operation and normally operates on demand, which is normally up to 6 hours a day. Presently the reactor core is made up of standard TRIAGA fuel element consists of 8.5 wt%, 12 wt% and 20 wt% types; 20%-enriched and stainless steel clad. Several measures such as routine preventive maintenance and improving the reactor support systems have been taken toward achieving this long successful operation. Besides normal routine utilization like other TRIGA reactors, new strategies are implemented for effective increase in utilization. (author)

  16. Experience about performance of experimental facility VISA-2 for materials irradiation by the fast neutron flux at the RA reactor in Vinca; Iskustvo u radu eksperimentalnih uredjaja VISA-2 za ozracivanje materijala u fluksu brzih neutron na reaktoru RA u Vinci

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institut za nuklearne nauke Boris Kidric, Vinca, Beograd (Yugoslavia)

    1964-07-01

    VISA-2 is an experimental device placed in the core of the RA reactor cooled by heavy water. The objective of constructing this device was irradiation of non-fissile samples of reactor materials in order to test radiation damage. Since the first irradiation program performed in 1962 a number of long-term irradiations were done successfully. This proved the device to be useful and showed new possibilities for RA reactor application. The irradiation programs were performed in cooperation with CEA- Saclay.

  17. Radiation protection at the RA reactor in 1987, Part I: Control of the working environment - dosimetry and radiation protection at the RA reactor, Annex 1; Prilog 1, Zastita od zracenja kod reaktora RA u 1987. godini - Deo 1: Kontrola radne sredine - poslovi dozimetrije i tehnicke zastite od zracenja kod reaktora RA

    Energy Technology Data Exchange (ETDEWEB)

    Ninkovic, M; Bjelanovic, J; Minincic, Z; Komatina, R; Raicevic, J [Institute of Nuclear Sciences Boris Kidric, Vinca, Laboratory for radiation and environmental proetecion, Beograd (Serbia and Montenegro)

    1987-12-15

    This report contains data and analysis of the of measured sample results collected during radiation protection control in the working environment of the RA reactor. First part contains basic exposure values and statistical review of the the total number of radiation measurements. It includes contents of radioactive gasses and effluents in the air, as well as the level of surface contamination of clothes and uncovered parts of the personnel bodies. Second part deals with the analysis of personnel doses. It was found that the maximum individual dose from external irradiation amounted was less than 6.0 mSv during past 10 months. Individual exposures for 9/10 of the personnel were less than 1/10 of the annual permissible exposure. Data are compared to radiation doses for last year and previous five years. Third part of this annex contains basic data about the quantity of collected radioactive waste, total quantity of contaminated and decontaminated surfaces. During 1987 there have been no accidents that could cause significant contamination of working surfaces and components nor radiation exposure of the personnel. [Serbo-Croat] U ovom izvestaju prikazani su analizirani reprezentativni rezultati sakupljeni u okviru kontrole radne sredine i tehnicke zastite od zracenja reaktora RA. U prvom delu izvestaja izlozeni su podaci o osnovnim vidovima izlaganja zracenju i statisticki pregled ukupnog broja radiacionih merenja. Dati su takodje rezultati merenja sadrzaja radioktivnih gasova i aerosola u vazduhu, kao i stepena kontaminacije povrsina, odece i otkrivenih delova tela osoblja. U drugom delu izvestaja izlozeni su rezultati analize ozracivanja radnog osoblja. Utvrdjeno je da je maksimalna individualna doza spoljasnjeg izlaganja u proteklih 10 meseci bila 6,0 mSv, a da su pojadinacna izlaganja vise od 9/10 radnog osoblja bila manja od 1/10 godisnje granicne vrednosti. Dati su takodje uporedni podaci o ozracivanju osoblja u prethodnoj, kao i u pet proteklih godina, iz kojih

  18. 78 FR 71675 - Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence

    Science.gov (United States)

    2013-11-29

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0260] Update of the Office of Nuclear Reactor Regulation's Electronic Operating Reactor Correspondence The U.S. Nuclear Regulatory Commission (NRC) is issuing this Federal Register notice to inform the public of a slight change in the manner of distribution of publicly available operating reactor licensing...

  19. The development of reactor operator license examination question bank

    International Nuclear Information System (INIS)

    Kim, In Hwan; Woo, S. M.; Kam, S. C.; Nam, K. J.; Lim, H. P.

    2001-12-01

    The number of NPP keeps increasing therefore there is more need of reactor operators. This trend requires the more efficiency in managing the license examination. Question bank system will help us to develop good quality examination materials and keep them in it. The ultimate purpose of the bank system is for selecting qualified reactor operators who are primarily responsible for the safety of reactor operation in NPP

  20. Neutron measurements inside reactors with semiconductor counters; Apsolutno merenje neutronskih flukseva u jezgru reaktora RA visokim snagama

    Energy Technology Data Exchange (ETDEWEB)

    Ajdacic, V; Lalovic, B; Barucija, M; Petrovic, B [Institute of Nuclear Sciences Boris Kidric, Laboratorija za fiziku i dinamiku reaktora, Vinca, Beograd (Serbia and Montenegro)

    1964-06-15

    A method of absolute in-core measurement of high neutron fluxes inside reactors operating in the megawatt region is described. In this method a semiconductor counter observes particles coming from neutron induced reactions in a target placed inside the reactor core through a long evacuated aluminum tube. The paper deals with factors which influence the accuracy of the method. Possible use of the long- tube method for neutron flux measurements in advanced reactors with neutron flux of 10{sup 15}-10{sup 16} n/cm{sup 2} sec is also discussed. The possibility of using the Li{sup 6} semiconductor counter spectrometer for measuring fast neutron spectra inside the zero power reactor at Vinca has been investigated. Great difficulties associated with the high interference of thermal neutrons have been encountered. The thermal neutron interference is almost completely suppressed by a new detector-target arrangement, in which only those products of the Li{sup 6} (n,alpha)T reactions whose mutual angle of emission is different from 180 deg are detected in coincidence. Resolution of the spectrometer as a function of the reactor power and correction factors of the spectrometer efficiency for various neutron energies are presented (author)