WorldWideScience

Sample records for quarterly technical progress

  1. Quarterly Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Ayman I. Hawari

    2002-12-30

    This report presents the progress made during the first quarter of phase 2 for the project entitled ''Development and Validation of Thermal Neutron Scattering Laws from Applications and Safety Implications in Generation IV Reactor Designs.'' (B204) THIS IS NOT A FINAL REPORT

  2. Quarterly Technical Progress Report June 2015

    Energy Technology Data Exchange (ETDEWEB)

    Buchholz, Bruce A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-08

    The project has two main goals: 1) Identify the types of adducts naphthalene (NA) forms with DNA and 2) determine whether adduct formation correlates with site selective tumor formation in defined subcompartments of the respiratory tract (respiratory and olfactory nasal epithelium and airways of mice, rats and rhesus monkeys). Five tasks are associated with the completion of the goals. Task 1: Contracting and Animal Use Approvals. IACUC and ACURO approvals are complete, The subcontract with UC Davis (UCD) was executed in December 2014. Task 2: Perform In Vitro Study for Goal 1. Rat samples exposed and in freezer while adduct standards are being made. Mouse samples need to be exposed in next quarter. Task 3: Perform In Vitro Study for Goal 2. Mouse ex vivo samples completed. Rat and monkey samples need to be completed in the next quarter. Task 4: Sample Preparation and Analysis. Mouse Goal 2 samples completed. Other samples remain to be done. Task 5: Data Interpretation and Reporting. Need rat data to write paper on adduct formation.

  3. Mechanism for Clastogenic Activity of Naphthalene. Quarterly Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Buchholz, B. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-02-05

    The project has two main goals: 1) Identify the types of adducts naphthalene (NA) forms with DNA and 2) determine whether adduct formation correlates with site selective tumor formation in defined subcompartments of the respiratory tract (respiratory and olfactory nasal epithelium and airways of mice, rats and rhesus monkeys). Five tasks are associated with the completion of the goals. Task 1: Contracting and Animal Use Approvals. IACUC and ACURO approvals are complete. The subcontract with UC Davis (UCD) was executed in December 2014. Task 2: Perform In Vitro Study for Goal 1. Rat and mouse samples exposures completed. Monkey samples need to be exposed in next quarter. Task 3: Perform In Vitro Study for Goal 2. Mouse and rat ex vivo exposures completed. Monkey samples need to be completed in the next quarter. Task 4: Sample Preparation and Analysis. Mouse and Rat Goal 2 samples completed. Monkey samples remain to be done for Goal 2. Rat samples completed for Goal 1. Mouse and Monkey samples for Goal 1 need to be completed. Task 5: Data Interpretation and Reporting. Poster will be presented at 2016 Society of Toxicology Meeting. Outline for paper on adduct formation complete and similar to poster for SOT meeting.

  4. Quarterly technical progress report, February 1, 1996--April 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-28

    This report from the Amarillo National REsource Center for PLutonium provides research highlights and provides information regarding the public dissemination of information. The center is a a scientific resource for information regarding the issues of the storage, disposition, potential utilization and transport of plutonium, high explosives, and other hazardous materials generated from nuclear weapons dismantlement. The center responds to informational needs and interpretation of technical and scientific data raised by interested parties and advisory groups. Also, research efforts are carried out on remedial action programs and biological/agricultural studies.

  5. Electronic refrigerant leak detector. Quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Talamas, E. Jr.

    1998-10-15

    The project comprises three main tasks. They are (1) Develop, design, and fabricate sensors, (2) Develop, design, and fabricate test instruments, (3) Testing and data analysis. The milestone includes 17 sub-tasks for the 52-weeks project period, starting on May 1, 1998 and ending on April 30, 1999. As stated in the Application for Federal Assistance, Micronic intended to relocate to a new office by June of 1998. This decision was delayed, since the first partial payment was transferred on August 12, 1998. Micronic plans to relocate this November. A second Provisional Application for a US patent has been filed. Progress made during this period is reported.

  6. Quarterly technical progress report, April-June 1982

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-04-01

    Progress reports are presented for the following tasks: (1) preparation of low-rank coals; application of liquefaction processes to low-rank coals; (2) slagging fixed-bed gasification; (3) atmospheric fluidized-bed combustion of low-rank coal; (4) ash fouling and combustion modification for low-rank coal; (5) combined flue gas cleanup/simultaneous SO/sub x/-NO/sub x/ control; (6) particulate control and hydrocarbons and trace element emissions from low-rank coals; (7) waste characterization and disposal; and (9) exploratory research.

  7. Technical Division quarterly progress report, January 1--March 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Slansky, C.M. (ed.)

    1977-05-01

    Progress is reported in three categories: Fuel Cycle Research and Development, special materials production, and projects supporting energy development. Results are presented on the fluidized-bed calcination of high-level radioactive waste from the reprocessing of spent commercial nuclear fuel, on the post treatment of the calcine, and on the removal of actinide elements from the waste prior to calcination. Other projects include the development of storage technology for /sup 85/Kr waste; a study of the hydrogen mordenite catalyzed reaction between NO/sub x/ and NH/sub 3/; the adsorption and storage of /sup 129/I on silver exchanged mordenite; physical properties, materials of construction, and unit operations studies on the evaporation of high-level waste; the behavior of volatile radionuclides during the combustion of HTGR graphite-based fuel; and the use of fission product ruthenium in age-dating uranium ore bodies. The long-term management of defense waste from the ICPP covers post-calcination treatment of ICPP calcined waste. Improvements are reported on the Fluorinel head end process for Zircaloy-clad fuels. Studies are included on nuclear materials security; application of a liquid-solid fluidized-bed heat exchanger to the recovery of geothermal heat; inplant reactor source term measurements; burnup methods for fast breeder reactor fuels; research on analytical methods; and the behavior of environmental species of iodine.

  8. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Reports on a quarterly basis. This report comprises the first Quarterly Technical Progress Report for Year 2 of the Agreement. This report reflects the progress and/or efforts performed on the sixteen (16) technical projects encompassed by the Year 2 Agreement for the period of January 1 through March 31, 1994. In situ bioremediation of chlorinated organic solvents; Microbial enrichment for enhancing in-situ biodegradation of hazardous organic wastes; Treatment of volatile organic compounds (VOCs) using biofilters; Drain-enhanced soil flushing (DESF) for organic contaminants removal; Chemical destruction of chlorinated organic compounds; Remediation of hazardous sites with steam reforming; Soil decontamination with a packed flotation column; Use of granular activated carbon columns for the simultaneous removal of organics, heavy metals, and radionuclides; Monolayer and multilayer self-assembled polyion films for gas-phase chemical sensors; Compact mercuric iodide detector technology development; Evaluation of IR and mass spectrometric techniques for on-site monitoring of volatile organic compounds; A systematic database of the state of hazardous waste clean-up technologies; Dust control methods for insitu nuclear and hazardous waste handling; Winfield Lock and Dam remediation; and Socio-economic assessment of alternative environmental restoration technologies.

  9. Power systems development facility. Quarterly technical progress report, January 1, 1994--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This quarterly technical progress report summarizes work completed during the last quarter of the Second Budget Period, January 1 through March 31, 1994, entitled {open_quotes}Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.{close_quotes} The objective of this project is to evaluate hot gas particulate control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size.

  10. PFBC HGCU test facility technical progress report. First Quarter, CY 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This is the eighteenth Technical Progress Report submitted in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. During this quarter, the Tidd Hot Gas Clean Up System operated for 835 hours during six separate test runs. The system was starting into a seventh run at the end of the quarter. Highlights of this period are summarized below: the longest run during the quarter was approximately 333 hours; filter pressure drop was stable during all test runs this quarter using spoiling air to the primary cyclone upstream of the Advanced Particle Filter (APF); the tempering air system was commissioned this quarter which enabled the unit to operate at full load conditions while limiting the gas temperature in the APF to 1,400 F; during a portion of the one run, the tempering air was removed and the filter operated without problems up to 1,450 F; ash sampling was performed by Battelle personnel upstream and downstream of the APF and ash loading and particle size distribution data were obtained, a summary report is included; a hot area on the APF head was successfully repaired in service; a hot spot on the top of an expansion joint was successfully repaired by drilling holes from the inside of the pipe and pumping in refractory insulation; a corrosion inspection program for the HGCU system was issued giving recommendations for points to inspect; filter internal inspections following test runs 13 and 17 revealed a light coating (up to 1/4 inch thick) of residual ash on the candles and some ash bridging between the dust sheds and inner rows of candles. Data from these inspections are included with this report.

  11. PFBC HGCU Test Facility. Technical progress report No. 24, Third quarter, CY 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    This is the twenty-fourth and final Technical Progress Report submitted to the Department of Energy (DOE) in connection with the cooperative agreement between the DOE and Ohio Power Company for the Tidd PFBC Hot Gas Clean Up Test Facility. This report covers the work completed during the Third Quarter of CY 1995. All activity this quarter was directed toward the completion of the program final report. A draft copy of the final report was forwarded to DOE during this quarter, and DOE submitted their comments on the report to AEPSC. DOE requested that Westinghouse write an appendix to the report covering the performance of the fail-safe regenerator devices during Tad operation, and Westinghouse subsequently prepared the appendix. Additional DOE comments were incorporated into the report, and it will be issued in camera-ready form by the end of October, 1995, which is the program end date. Appendix 1 presents the results of filter candle posttest examination by Westinghouse performed on selected filter candles following final shutdown of the system.

  12. Quarterly technical progress report, October-December 1982 on Energy Conversion Research and Development Programs

    Energy Technology Data Exchange (ETDEWEB)

    1983-10-01

    In this quarterly technical progress report, UTSI reports on the continued design work for the low mass flow train superheater. The detailed design of this component continued and the overall arrangement drawing for the superheater and air heater was finalized. The air heater procurement reached the point of contract award, but the actual purchase order award was held up pending receipt of additional funding from the Department of Energy. Testing activity reported includes two additional tests in the LMF1C series, which concludes this test series. Test data are presented, along with preliminary analyses for the combustor, nozzle, diagnostic channel, diffuser, radiant furnace/secondary combustor and Materials Test Module. In addition to the nitrogen oxide test measurements, corrosion and erosion rates for the boiler tube specimens and the materials test module are reported.

  13. MHD Integrated Topping Cycle Project. Seventeenth quarterly technical progress report, August 1, 1991--October 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    This seventeenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period August 1, 1991 to October 31, 1991. Manufacturing of the prototypical combustor pressure shell has been completed including leak, proof, and assembly fit checking. Manufacturing of forty-five cooling panels was also completed including leak, proof, and flow testing. All precombustor internal components (combustion can baffle and swirl box) were received and checked, and integration of the components was initiated. A decision was made regarding the primary and backup designs for the 1A4 channel. The assembly of the channel related prototypical hardware continued. The cathode wall electrical wiring is now complete. The mechanical design of the diffuser has been completed.

  14. Redwood Community Action Agency: Technical progress report, 3rd quarter, 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Since the second quarter, at which time venture feasibility activities were well underway by Redwood Community Action Agency (RCAA) to develop a shared-savings energy business plan, significant progress has been made. Nearly all consultant reports on the technical feasibility analysis have been completed, initial market research has begun and capitalization strategy has been investigated. Additionally, RCAA received an award of a substantial grant from the California Dept. of Economic Opportunity to develop a series of business ventures with a consortium of Northern California community providers. Fifteen thousand dollars of equity capital has been allocated for the energy-related business venture being investigated under this grant. If all plans go as anticipated, this money, combined with agency unrestricted funds, will provide the initial seed capital for the venture.

  15. Advancement of flash hydrogasification. Quarterly technical progress report, January-March 1984

    Energy Technology Data Exchange (ETDEWEB)

    Falk, A.Y.

    1984-06-25

    This first quarterly report documents technical progress during the period 31 December 1983 through 30 March 1984. The technical effort is 17 months in duration and is divided into two major technical tasks: Task VII, Hardware Fabrication and PDU Modifications, and Task VIII, Performance Testing. The design of test hardware and process development unit modifications had been previously completed as part of Task VI of the current contract. Task VII involves the fabrication of test hardware and modification of an existing 1-ton/h hydroliquefaction PDU at Rockwell's facilities for use as a hydrogasifier test facility. During this report period, fabrication of the test hardware and modifications to the PDU were initiated. Test hardware fabrication is now approximately 80% complete and should be completed by the end of May 1984. PDU modifications are progressing well and should be completed by the end of June 1984. The completed test hardware fabrication and PDU modifications will allow the conduct of short duration (1 to 2 h) hydrogasification tests along with preburner assembly performance evaluation tests in order to fulfill the test program objectives. Separate supplies of hydrogen, oxygen, methane, carbon monoxide, and water (for steam generation) are provided for this purpose. The modified facility is designed to accommodate both 10- and 20-ft-long hydrogasifier reactors so that residence times will be in the range of 2 to 6 s when coal is fed at a nominal 1/2 ton/h into reactors at 1000 psia pressure. Provisions are being made for real-time analysis of the product gases using an on-line gas chromatograph system. Test planning was the only Task VIII effort active during this report period. An initial (preliminary) test matrix has been defined. Preparation of a data analysis plan is underway, and data reduction programs are being programmed. 17 references, 25 figures, 6 tables.

  16. MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

  17. Power systems development facility. Quarterly technical progress report, July 1--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly technical progress report summarizes work completed during the Second Quarter of the Second Budget Period, July 1 through September 30, 1993, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scaleup of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the existing Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. Hot Gas Cleanup Units to mate to all gas streams; Combustion Gas Turbine; and Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility.

  18. MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  19. Coal liquefaction process streams characterization and evaluation. Quarterly technical progress report, April 1--June 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Brandes, S.D.; Lancet, M.S.; Robbins, G.A.; Winschel, R.A.; Burke, F.P.

    1992-11-01

    This is the eleventh Quarterly Technical Progress Report under DOE Contract DE-AC22-89PC89883. Major topics reported are: (1) The results of a study designed to determine the effects of the conditions employed at the Wilsonville slurry preheater vessel on coal conversion is described. (2) Stable carbon isotope ratios were determined and used to source the carbon of three product samples from Period 49 of UOP bench-scale coprocessing Run 37. The results from this coprocessing run agree with the general trends observed in other coprocessing runs that we have studied. (3) Microautoclave tests and chemical analyses were performed to ``calibrate`` the reactivity of the standard coal used for determining donor solvent quality of process oils in this contract. (4) Several aspects of Wilsonville Close-Coupled Integrated Two-Stage Liquefaction (CC-ITSL) resid conversion kinetics were investigated; results are presented. Error limits associated with calculations of deactivation rate constants previously reported for Runs 258 and 261 are revised and discussed. A new procedure is described that relates the conversions of 850{degrees}F{sup +} , 1050{degrees}F{sup +}, and 850 {times} 1050{degrees}F material. Resid conversions and kinetic constants previously reported for Run 260 were incorrect; corrected data and discussion are found in Appendix I of this report.

  20. Coal liquefaction process streams characterization and evaluation. Quarterly technical progress report, January 1--March 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1992-08-01

    This is the tenth Quarterly Technical Progress Report under DOE Contract DE-AC22-89PC89883. Process oils from Wilsonville Run 262 were analyzed to provide information on process performance. Run 262 was operated from July 10 through September 30, 1991, in the thermal/catalytic Close-Coupled Integrated Two-Stage Liquefaction (CC-ITSL) configuration with ash recycle. The feed coal was Black Thunder Mine subbituminous coal. The high/low temperature sequence was used. Each reactor was operated at 50% of the available reactor volume. The interstage separator was in use throughout the run. The second-stage reactor was charged with aged Criterion 324 catalyst (Ni/Mo on 1/16 inch alumina extrudate support). Slurry catalysts and sulfiding agent were fed to the first-stage reactor. Molyvan L is an organometallic compound which contains 8.1% Mo, and is commercially available as an oil-soluble lubricant additive. It was used in Run 262 as a dispersed hydrogenation catalyst precursor, primarily to alleviate deposition problems which plagued past runs with Black Thunder coal. One test was made with little supported catalyst in the second stage. The role of phenolic groups in donor solvent properties was examined. In this study, four samples from direct liquefaction process oils were subjected to O-methylation of the phenolic groups, followed by chemical analysis and solvent quality testing.

  1. MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  2. Projects at the Western Environmental Technology Office. Quarterly technical progress report, January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This quarterly report briefly describes recent progress in eight projects. The projects are entitled Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Spray Casting Project; and Watervliet Arsenal Project.

  3. Projects at the Western Environmental Technology Office. Quarterly technical progress report, January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This quarterly report briefly describes recent progress in eight projects. The projects are entitled Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Spray Casting Project; and Watervliet Arsenal Project.

  4. Responsive copolymers for enhanced petroleum recovery. Quarterly technical progress report, December 22, 1993--March 21, 1994

    Energy Technology Data Exchange (ETDEWEB)

    McCormick, C.; Hester, R.

    1994-06-01

    The overall goal of this research is the development of advanced water-soluble copolymers for use in enhanced oil recovery. This report summarizes technical progress for the following tasks: advanced copolymer synthesis; and characterization of molecular structure of copolymers.

  5. Field-simulation analysis for disposal of liquefaction solid waste. Third quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    1982-08-27

    The tasks to be performed in this study are: (1) review applicable RCRA documents; (2) select waste and site-related parameters of interest; (3) compare and recommend leachate test methods; (4) review predictive simulation models and select one or more for further development; (5) identify required field verification data; and (6) develop a field monitoring program to obtain these data. This report represents the third quarterly progress report and contains the text prepared to date under Task 4.

  6. Instrumentation and process control for fossil demonstration plants. Quarterly technical progress report, January--March 1977

    Energy Technology Data Exchange (ETDEWEB)

    LeSage, L.G.; O' Fallon, N.M.

    1977-09-01

    Progress during the quarter of January through March 1977 on ANL 189a 49622R2, Instrumentation and Process Control for Fossil Demonstration Plants (FDP) is reported. Work has been performed on updating the study of the state-of-the-art of instrumentation for Fossil Demonstration Plants (FDP), on development of mass-flow and other on-line instruments for FDP, process control analysis for FDP, and organization of a symposium on instrumentation and control for FDP. Progress in these areas is described.

  7. [Geothermal system temperature-depth database and model for data analysis]. 5. quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Blackwell, D.D.

    1998-04-25

    During this first quarter of the second year of the contract activity has involved several different tasks. The author has continued to work on three tasks most intensively during this quarter: the task of implementing the data base for geothermal system temperature-depth, the maintenance of the WWW site with the heat flow and gradient data base, and finally the development of a modeling capability for analysis of the geothermal system exploration data. The author has completed the task of developing a data base template for geothermal system temperature-depth data that can be used in conjunction with the regional data base that he had already developed and is now implementing it. Progress is described.

  8. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, May 1--July 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Progress is reported on research projects related to the following: Electronic resource library; Environment, safety, and health; Communication, education, training, and community involvement; Nuclear and other materials; and Reporting, evaluation, monitoring, and administration. Technical studies investigate remedial action of high explosives-contaminated lands, radioactive waste management, nondestructive assay methods, and plutonium processing, handling, and storage.

  9. Management of dry flue gas desulfurization by-products in underground mines. Quarterly technical progress report, April 1995--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    Chugh, Y.P.; Dutta, D.; Esling, S. [and others

    1995-07-01

    On September 30, 1993, the U.S. Department of Energy-Morgantown Energy Technology Center and Southern Illinois University at Carbondale (SIUC) entered into a cooperative research agreement entitled {open_quotes}Management of Dry Flue Gas Desulfurization By-Products in Underground Mines{close_quotes} (DE-FC21-93MC30252). Under the agreement Southern Illinois University at Carbondale will develop and demonstrate several technologies for the placement of coal combustion residues in abandoned coal mines, and will assess the environmental impact of such underground residues placement. Previous quarterly Technical Progress Reports have set forth the specific objectives of the program, and a discussion of these is not repeated here. Rather, this report discusses the technical progress made during the period April 1 - June 30, 1995. A final topical report on the SEEC, Inc. demonstration of its technology for the transporting of coal combustion residues was completed during the quarter, although final printing of the report was accomplished early in July, 1995. The SEEC technology involves the use of Collapsible Intermodal Containers (CIC`s) developed by SEEC, and the transportation of such containers - filled with fly ash or other coal combustion residues - on rail coal cars or other transportation means. Copies of the final topical report, entitled {open_quotes}The Development and Testing of Collapsible Intermodal Containers for the Handling and Transport of Coal Combustion Residues{close_quotes} were furnished to the Morgantown Energy Technology Center. The Rapid Aging Test colums were placed in operation during the quarter. This test is to determine the long-term reaction of both the pneumatic and hydraulic mixtures to brine as a leaching material, and simulates the conditions that will be encountered in the actual underground placement of the coal combustion residues mixtures. The tests will continue for about one year.

  10. Silicon ribbon growth by a capillary action shaping technique. Quarterly technical progress report No. 2

    Energy Technology Data Exchange (ETDEWEB)

    Schwuttke, G.H.; Ciszek, T.F.; Kran, A.

    1975-01-01

    Progress during the second quarter of the contractual effort is described. The work performed related mainly to ribbon growth by a capillary action shaping technique and to ribbon characterization. Actual progress in the crystal growth area includes the evaluation of 10 potential die materials other than carbon and the process development for 25-mm-wide ribon. From the die study it is concluded that boron carbide, silicon carbide, and silicon nitride may warrant further investigation as die materials. Process development for 25-mm ribbon growth resulted in ribbons of superior surface quality. Potential ribbongrowth problems encountered and discussed include a boron doping anomaly and frozen-in stresses in ribbons. The characterization effort concentrated on the development of a solar-cell process to be used for ribbon characterization. Material requirements and detailed process procedures are given. Solar cells fabricated by this process are compared with commercially available solar cells and compare favorably. A transmission electron microscopy study of planar boundaries frequently observed in ribbon crystals is reported. (auth)

  11. Decontamination Systems Information and Research Program. Quarterly technical progress report, January 1--March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This reports reports the progress/efforts performed on six technical projects: 1. systematic assessment of the state of hazardous waste clean-up technologies; 2. site remediation technologies (SRT):drain- enhanced soil flushing for organic contaminants removal; 3. SRT: in situ bio-remediation of organic contaminants; 4. excavation systems for hazardous waste sites: dust control methods for in-situ nuclear waste handling; 5. chemical destruction of polychlorinated biphenyls; and 6. development of organic sensors: monolayer and multilayer self-assembled films for chemical sensors.

  12. Volatiles combustion in fluidized beds. [Quarterly] technical progress report, 4 December 1994--4 March 1995

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass II, R.A.; Mansker, L.D.; Hesketh, R.P.

    1995-08-01

    The goal of this project is to investigate the conditions in which volatiles will bum within both the dense and freeboard regions of fluidized beds. Experiments using a fluidized bed operated at incipient fluidization are being conducted to characterize the effect of particle surface area, initial fuel concentration, and particle type on the inhibition of volatiles within a fluidized bed. The work conducted during the period 4 December, 1994 through, 3 March 1995 is presented in this technical progress report. The research consists of the application of a detailed chemical kinetics model for propane combustion and planned improvements in the experimental system.

  13. Great Plains Coal Gasification Project: Quarterly technical progress report, April-June 1988 (Fourth fiscal quarter, 1987-1988)

    Energy Technology Data Exchange (ETDEWEB)

    1988-07-29

    This progress report describes the operation of the Great Plains Gasification Plant, including lignite coal production, SNG production, gas quality, by-products, and certain problems encountered. (LTN)

  14. Engineering support services for the DOE/GRI coal gasification research program. Quarterly technical progress report, January-March 1982

    Energy Technology Data Exchange (ETDEWEB)

    Bostwick, L.E.; Ethridge, T.R.; Starr, D.W.; Koneru, P.B.; Hubbard, D.A.; Shah, K.V.; Smith, M.R.; Ward, W.E.; Wong, E.W.

    1982-05-01

    Kellogg continued to actively monitor operations at BI-GAS, Westinghouse and IGT (for peat gasification). Pilot plant/PDU test runs which were monitored and reported included BI-GAS Tests G-18, G-18A and G-18B; Westinghouse PDU Test TP-032-1 and CFSF Test TP-M003; and Peatgas Pilot Plant Test No. 5. Kellogg also monitored winterization/maintenance activities at BI-GAS and Westinghouse and precommissioning of the IGT Wet Carbonization PDU. The final report on the Hygas Data Base Evaluation was issued, while final revisions were completed for the reports concerning PDU data base evaluations of Peatgas and single-stage peat gasification. Efforts toward completion of the brochure describing the DOE/GRI Joint Program proceeded. Normal MPC activities continued. Several technical progress reports were issued during this quarter.

  15. Solvent refined coal (SRC) process. Quarterly technical progress report, January 1980-March 1980. [In process streams

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    This report summarizes the progress of the Solvent Refined Coal (SRC) project at the SRC Pilot Plant in Fort Lewis, Wahsington, and the Process Development Unit (P-99) in Harmarville, Pennsylvania. After the remaining runs of the slurry preheater survey test program were completed January 14, the Fort Lewis Pilot Plant was shut down to inspect Slurry Preheater B and to insulate the coil for future testing at higher rates of heat flux. Radiographic inspection of the coil showed that the welds at the pressure taps and the immersion thermowells did not meet design specifications. Slurry Preheater A was used during the first 12 days of February while weld repairs and modifications to Slurry Preheater B were completed. Two attempts to complete a material balance run on Powhatan No. 6 Mine coal were attempted but neither was successful. Slurry Preheater B was in service the remainder of the quarter. The start of a series of runs at higher heat flux was delayed because of plugging in both the slurry and the hydrogen flow metering systems. Three baseline runs and three slurry runs of the high heat flux program were completed before the plant was shut down March 12 for repair of the Inert Gas Unit. Attempts to complete a fourth slurry run at high heat flux were unsuccessful because of problems with the coal feed handling and the vortex mix systems. Process Development Unit (P-99) completed three of the four runs designed to study the effect of dissolver L/D ratio. The fourth was under way at the end of the period. SRC yield correlations have been developed that include coal properties as independent variables. A preliminary ranking of coals according to their reactivity in PDU P-99 has been made. Techniques for studying coking phenomenona are now in place.

  16. Methyl chloride via oxyhydrochlorination of methane. Quarterly technical progress report No. 7, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The purpose of this contract is to develop a process for converting light alkane gases to methyl chloride via oxyhydrochlorination using highly selective, stable catalysts in fixed-bed reactors designed to remove the large amount of heat generated, so as to control the reaction temperature. Further, the objective is to obtain the engineering data base necessary for developing a commercially feasible process and to evaluate the economics of the process. Several key technology areas were evaluated this quarter. The catalyst definition effort focused on the determination of the role of the Li and La promoters that have been found to be useful in enhancing Cu based oxyhydrochlorination of methane catalysts. Initial experiments show that the La acts to provide a much more active catalyst than the Cu only case. The role of the Li is ambiguous at this point. The Li enhances the stability of the La promoted catalyst, but gives only marginal improvement by itself This work will be continued, with additional emphasis on the analysis of the catalysts to determine the structural role that the promoters may play. The separation unit operation definition made significant progress by demonstrating in a laboratory system that a process solvent may be used to remove the product CH{sub 3}Cl from the reactor effluent stream. To date the data has been qualitative, but clear. Work will continue to gather the information possible in the laboratory to help with PDU design. An extensive amount of testing was performed on the chosen process solvent, Multitherm. A comprehensive review of all the thermal testing and associated FTIR, UV/VIS, and physical property testing is included in this report. This work shows that Multitherm should give the desired stability and solubility that are necessary to make the separation unit operation successful.

  17. PFBC HGCU Test Facility. Fourth quarterly technical progress report, [October--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    The APF was shut down on September 23, 1993 and no operation was performed during this quarter. This report summarizes inspection, candle reinstallation, retrofit and accelerometer testing conducted during this three month outage.

  18. Hot gas cleanup test facility for gasification and pressurized combustion. Quarterly technical progress report, January 1--March 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    This quarterly technical progress report summarizes work completed during the Sixth Quarter of the First Budget Period, January 1 through March 31, 1992, under the Department of Energy (DOE) Cooperative Agreement No. DE-FC21-90MC25140 entitled ``Hot Gas Cleanup Test Facility for Gasification and Pressurized Combustion.`` The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. The major emphasis during this reporting period was expanding the test facility to address system integration issues of hot particulate removal in advanced power generation systems. The conceptual design of the facility was extended to include additional modules for the expansion of the test facility, which is referred to as the Power Systems Development Facility (PSOF). A letter agreement was negotiated between Southern Company Services (SCS) and Foster Wheeler (FW) for the conceptual design of the Advanced Pressurized Fluid-Bed Combustion (APFBC)/Topping Combustor/Gas Turbine System to be added to the facility. The expanded conceptual design also included modifications to the existing conceptual design for the Hot Gas Cleanup Test Facility (HGCTF), facility layout and balance of plant design for the PSOF. Southern Research Institute (SRI) began investigating the sampling requirements for the expanded facility and assisted SCS in contacting Particulate Control Device (PCD) vendors for additional information. SCS also contacted the Electric Power Research Institute (EPRI) and two molten carbonate fuel cell vendors for input on the fuel cell module for the PSDF.

  19. Liquid fossil-fuel technology. Quarterly technical progress report, January-March 1983

    Energy Technology Data Exchange (ETDEWEB)

    Linville, B. (ed.)

    1983-07-01

    Accomplishments for the quarter ending March 1983 are presented under the following headings: liquid fossil fuel cycle, processing, utilization, and project integration and technology transfer. Feature articles for this quarter are: (1) abandoned oil field reports issued; (2) oilfield water data bank report published; (3) microbial enhanced recovery report issued; (4) polymer-augmented project could be economic today; (5) carbon dioxide EOR estimates given; (6) BETC passes 65th milestone; and (7) fifty achievements for fifty years (1918-1968). BETC publications are also listed. (ATT)

  20. Jointly sponsored research program quarterly technical progress report, January--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    Progress reports are presented for the following tasks: Development and demonstration of a practical electric downhole steam generator for thermal recovery of heavy oil and tar; wetting behavior of selected crude oil/brine/rock systems; coal gasification, power generation, and product market study; impact of leachate from clean coal technology waste on the stability of clay liners; investigation of coprocessing of heavy oil, automobile shredder residue, and coal; injection into coal seams for simultaneous CO{sub 2} mitigation and enhanced recovery of coalbed methane; optimization of carbonizer operations in the FMC coke process; chemical sensor and field screening technology development; demonstration of the Koppelman ``Series C`` Power River Basin coal as feed; remote chemical sensor development; market assessment and technical feasibility study of PFBC ash use; solid-state NMR analysis and interpretation of naturally and artificially matured kerogens; Crow{trademark} field demonstration with Bell Lumber and Pole; ``B`` series pilot plant tests; and in-situ treatment of manufactured gas plant contaminated soils demonstration program.

  1. Critical contributions in MHD power generation. Quarterly technical progress report, December 1, 1977-February 28, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Louis, J.F.

    1978-03-01

    Research and development in open-cycle coal-fired MHD power generation is described. The scope and objectives of the MIT program are: (1) establish chemical, thermal, and electrical data to guide materials selection, develop improved detail designs, and support performance analyses of MHD electrode modules and insulator materials; (2) parametrically investigate selected electrode properties of critical design importance in chemical, thermal, and electrical environments simulating a coal-fired MHD generator; (3) develop combustion data pertinent to the design of MHD combustors; (4) establish techniques for the analysis and understanding of critical MHD phenomena which have an important bearing on MHD generator performance; such phenomena include inter-electrode breakdown, time-dependent behavior, effective plasma properties and plasma inhomogeneities; (5) establish the operating characteristics of an MHD disk generator; (6) continue work on computer techniques for modeling and for design and cost analysis of MHD components and the overall system; (7) integrate the engineering data and design criteria, as applicable, which are developed in the listed tasks into a model of the MHD channel; (8) participate in the US/USSR Cooperative Program in MHD Power Generation; and (9) participate in technical support of the DOE MHD Project Office. Progress in each of these areas is reported. (WHK)

  2. Critical contributions in MHD power generation. Quarterly technical progress report, September 1--November 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Louis, J.F.

    1977-12-01

    Research and development in open-cycle coal-fired MHD power generation at Massachusetts Institute of Technology (MIT) is summarized. Progress is reported on the following tasks: (1) Establish chemical, thermal, and electrical data to guide materials selection, develop improved detail designs, and support performance analyses of MHD electrode modules and insulator materials; (2) parametrically investigate selected electrode properties of critical design importance in chemical, thermal, and electrical environments simulating a coal-fired MHD generator; (3) develop combustion data pertinent to the design of MHD combustors; this work is intended to determine the combustion characteristics of selected coal feedstock in terms of devolatilization kinetics, char characteristics, and combustion gas chemistry; (4) establish techniques for the analysis and understanding of critical MHD phenomena which have an important bearing on MHD generator performance; such phenomena include inter-electrode breakdown, time-dependent behavior, effective plasma properties and plasma inhomogeneities; (5) establish the operating characteristics of an MHD disk generator; (6) continue work on computer techniques for modeling and for design and cost analysis of MHD components and the overall system; (7) integrate the engineering data and design criteria, as applicable, which are developed in the above-listed tasks into a model of the MHD channel; (8) participate in technical support of the DOE MHD Project Office.

  3. Amarillo National Resource Center for Plutonium quarterly technical progress report, August 1, 1997--October 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This report summarizes activities of the Amarillo National Resource Center for Plutonium during the quarter. The report describes the Electronic Resource Library; DOE support activities; current and future environmental health and safety programs; pollution prevention and pollution avoidance; communication, education, training, and community involvement programs; and nuclear and other material studies, including plutonium storage and disposition studies.

  4. Instrumentation of dynamic gas pulse loading system. Technical progress report, first quarter 1992

    Energy Technology Data Exchange (ETDEWEB)

    Mohaupt, H.

    1992-04-14

    The overall goal of this work is to further develop and field test a system of stimulating oil and gas wells, which increases the effective radius of the well bore so that more oil can flow into it, by recording pressure during the gas generation phase in real time so that fractures can be induced more predictably in the producing formation. Task 1: Complete the laboratory studies currently underway with the prototype model of the instrumentation currently being studied. Task 2: Perform field tests of the model in the Taft/Bakersfield area, utilizing operations closest to the engineers working on the project, and optimize the unit for various conditions encountered there. Task 3: Perform field test of the model in DGPL jobs which are scheduled in the mid-continent area, and optimize the unit for downhole conditions encountered there. Task 4: Analyze and summarize the results achieved during the complete test series, documenting the steps for usage of downhole instrumentation in the field, and compile data specifying use of the technology by others. Task 5: Prepare final report for DOE, and include also a report on the field tests completed. Describe and estimate the probability of the technology being commercialized and in what time span. The project has made substantial technical progress, though we are running about a month behind schedule. Expenditures are in line with the schedule. Increased widespread interest in the use of DGPL stimulation has kept us very busy. The computer modeling and test instrumentation developed under this program is already being applied to commercial operations.

  5. Critical contributions in MHD power generation. Quarterly technical progress report, December 1, 1976--February 28, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Louis, J.F.

    1977-08-01

    Research progress in open-cycle coal-fired MHD power generation at Massachusetts Institute of Technology (MIT) is reported. The scope and objectives of the MIT program are to: (1) Establish chemical, thermal, and electrical data to guide materials selection, develop improved detail designs, and support performance analyses of MHD electrode modules and insulator materials; (2) establish basic mechanical properties to guide detail design and fabrication of high field strength superconducting magnets for MHD applications; (3) parametrically investigate selected electrode properties of critical design importance in chemical, thermal, and electrical environments simulating a coal-fired MHD generator; (4) develop combustion data pertinent to the design of MHD combustors; (5) establish techniques for the analysis and understanding of critical MHD phenomena which have an important bearing on MHD generator performance; such phenomena include inter-electrode breakdown, time-dependent behavior, effective plasma properties and plasma inhomogeneities; (6) establish the operating characteristics of an MHD disk generator; (7) continue work on computer techniques for modeling and for design and cost analysis of MHD components and the overall system; (8) integrate the engineering data and design criteria, as applicable, which are developed in the above-listed tasks into a model of the MHD channel; (9) Participate in technical support of the ERDA MHD Project Office; (10) participate in the US/USSR Cooperative Program in MHD Power Generation. (11) During the summer of 1976, a short-term task in U-25 electrode screening was temporarily added to the scope of the contract. This effort involved screening tests, in the MIT MHD simulation facility of electrode modules and configurations intended for tests in the Soviet U-25 generator.

  6. Nucla circulating atmospheric fluidized bed demonstration project. Quarterly technical progress report, October--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  7. Fischer Tropsch synthesis in supercritical fluids. Quarterly technical progress report, October 1--December 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Akgerman, A.; Bukur, D.B. [Texas A and M Univ., College Station, TX (United States). Chemical Engineering Dept.

    1996-06-01

    Objectives for this quarter were to attempt to develop a model to predict the molecular diffusion coefficients to a high degree of accuracy so the authors may be able to predict both the molecular diffusion coefficient and thus the effective diffusivity a priori. They are working on a semi-empirical equation based on the rough hard sphere theory to predict diffusion coefficients in supercritical fluids. In addition, they planned to take additional data in order to extend the database available for development of the predictive equation. The paper discusses accomplishments and problems related to the diffusion coefficients of F-T products in supercritical fluids. Data are presented on the diffusion coefficients of 1-octene in ethane, propane, and hexane.

  8. Technical progress report for the quarter 1 October-31 December 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    This report describes the technical accomplishments on the commercial nuclear waste management programs and on the geologic disposal of nuclear wastes. The program is organized into eight tasks: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management. (DLC)

  9. Micropore diffusion in coal chars under reactive conditions: Quarterly technical progress report, 15 March 1987-15 June 1987

    Energy Technology Data Exchange (ETDEWEB)

    Calo, J.M.; Perkins, M.T.; Lilly, W.D.

    1987-01-01

    In this third quarterly technical progress report, we present some initial data obtained with the ''gradientless'' reactor, and explore the effects of dispersion in the reactor sampling line. In particular: the gas sampling system and the solenoid valve network have been assembled and interfaced between the 3'' Berty catalytic reactor and the mass spectrometer beam system; initial purging experiments were conducted with this system, focusing on the convoluting effects of the sampling line on time constant measurements; it was shown and concluded that for the projected operating regime, the sampling line configuration without the in-line filter should not introduce any appreciable error in the measurements; and an analysis of the dispersion effects to be expected in the sampling line has defined the useful flow rate ranges for the current system and the means by which to extend the dynamic range; e.g., by increasing the length of the small bore diameter tubing. 21 refs., 11 figs.

  10. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, May 1, 1997--July 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    Progress summaries are provided from the Amarillo National Center for Plutonium. Programs include the plutonium information resource center, environment, public health, and safety, education and training, nuclear and other material studies.

  11. Appalachian clean coal technology consortium. Technical quarterly progress report, October 1, 1996--December 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Yoon, R.H.; Basim, B.; Luttrell, G.H.; Phillips, D.I. [and others

    1997-01-28

    Novel chemicals that can be used for increasing the efficiency of fine coal dewatering was developed at Virginia Tech. During the past quarter, Reagent A was tested on three different coal samples in laboratory vacuum filtration tests. These included flotation products from Middle Fork plant, Elkview Mining Company, and CONSOL, Inc. The tests conducted with the Middle Fork coal sample (100 mesh x 0) showed that cake moisture can be reduced by more than 10% beyond what can be achieved without using dewatering aid. This improvement was achieved at 1 lb/ton of Reagent A and 0.1 inch cake thickness. At 0.5 inches of cake thickness, the improvement was limited to 8% at the same reagent dosage. The results obtained with the Elkview coal (28 mesh x 0) showed similar advantages in using the novel dewatering aid. Depending on the reagent dosage, cake thickness, drying cycle time and temperature, it was possible to reduce the cake moisture to 12 to 14% rage. In addition to achieving lower cake moisture, the use of Reagent A substantially decreased the cake formation time, indicating that the reagent improves the kinetics of dewatering. The test results obtained with CONSOL coal were not as good as with the other coals tested in the present work, which may be attributed to possible oxidation and/or contamination.

  12. Western Research Institute quarterly technical progress report, July--September 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    Accomplishments for the quarter are described briefly for the following areas of research: oil shale; tar sand; coal; advanced exploratory process technology; and jointly sponsored research. Oil shale research covers process studies. Tar sand research is on recycle oil pyrolysis and extraction (ROPE{sup TM}) Process. Coal research includes: coal combustion; integrated coal processing concepts; and solid waste management. Advanced exploratory process technology includes: advanced process concepts; advanced mitigation concepts; and oil and gas technology. Jointly sponsored research covers: CROW{sup TM} field demonstration with Bell Lumber and Pole; operation and evaluation of the CO{sub 2} HUFF-N-PUFF Process; fly ash binder for unsurfaced road aggregates; solid state NMR analysis of Mesaverde group, Greater Green River Basin, tight gas sands; characterization of petroleum residua; shallow oil production using horizontal wells with enhanced oil recovery techniques; surface process study for oil recovery using a thermal extraction process; oil field waste cleanup using tank bottom recovery process; remote chemical sensor development; in situ treatment of manufactured gas plant contaminated soils demonstration program; solid state NMR analysis of Mowry formation shale from different sedimentary basins; solid state NMR analysis of naturally and artificially matured kerogens; and development of an effective method for the clean-up of natural gas.

  13. Quarterly Technical Progress Report - Investigation of Syngas Interaction in Alcohol Synthesis Catalysts

    Energy Technology Data Exchange (ETDEWEB)

    Murty A. Akundi

    1998-11-10

    This report presents the work done on " Investigation of Syngas Interaction in Alcohol Synthesis Catalysts" during the last quarter. The major activity during this period is on FTIR absorption studies of Co/Cr catalysts using CO as a probe molecule. Transition metals cobalt and copper play significant roles in the conversion of syngas (CO + H2 ) to liquid fuels. With a view to examine the nature of interaction between CO and metal, the FTIR spectra of CO adsorbed on Co-Cr2 O3 composites were investigated. The results indicate that as cobalt loading increases, the intensity of the CO adsorption bands increase and several vibrational modes seem to be promoted. Heat treatment of the sample revealed two distinct processes of adsorption. Bands due to physisorption disappeared while bands due to chemisorption not only increased in intensity but persisted even after desorption. It seems that the physisorption process is more active when the catalyst is fresh and is hindered when carbidic/carbonyl formations occur on the metal surfaces.

  14. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, November 1, 1997--January 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    This report provides information on projects conducted by the Amarillo National Resource Center for Plutonium, a consortium of Texas A&M University, Texas Tech University, and the University of Texas. Progress is reported for four major areas: (1) plutonium information resource; (2) environmental, safety, and health; (3) communication, education, training, and community involvement; and (4) nuclear and other material studies. Environmental, safety, and health projects reported include a number of studies on high explosives. Progress reported for nuclear material studies includes storage and waste disposal investigations.

  15. Electrostatic beneficiation of coal. Quarterly technical progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Mazumder, M.K.; Lindquist, D.; Tennal, K.B.

    1996-07-01

    Progress reports are presented for the following: modification to the electrostatic separator; review of DOE specifications for minimum beneficiation and calculations of grinding requirements based on washability; two-pass beneficiation; analysis of different sieve fractions; measurement of charge to mass ratio as a function of height of deposition; and charging of coal against different materials.

  16. Great Basin paleoenvironmental studies project; Technical progress report: First quarter (January--August 1993)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    Project goals, project tasks, progress on tasks, and problems encountered are described and discussed for each of the studies that make up the Great Basin Paleoenvironmental Studies Project for Yucca Mountain. These studies are: Paleobotany, Paleofauna, Geomorphology, and Transportation. Budget summaries are also given for each of the studies and for the overall project.

  17. Molecular biological enhancement of coal biodesulfurization. Ninth quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Litchfield, J.H.; Zupancic, T.J.; Baker, B.; Palmer, D.T.; Fry, I.J.; Tranuero, C.G.; Wyza, R.E.; Schweitzer, A.; Conkle, H.N. [Battelle, Columbus, OH (United States); Chakravanty, L.; Tuovinen, O.H. [Ohio State Univ., Columbus, OH (United States)

    1991-09-13

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The original specific technical objectives of the project were to: clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; transfer this pathway into a fast-growing chemolithotropic bacterium; conduct a batch-mode optimization/analysis of scale-up variables.

  18. Molecular biological enhancement of coal desulfurization. Eleventh quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Litchfield, J.H.; Zupancic, T.J.; Kittle, J.D. Jr.; Baker, B.; Palmer, D.T.; Traunero, C.G.; Wyza, R.E.; Schweitzer, A.; Conkle, H.N. [Battelle, Columbus, OH (United States); Chakravarty, L.; Tuovinen, O.H. [Ohio State Univ., Columbus, OH (United States)

    1991-03-13

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The original specific technical objectives of the project were to: clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; return multiple copies of genes to the original host to enhance the biodesulfurization activity of the organism; transfer this pathway into a fast-growing chemolithotrophic bacterium; conduct a batch-mode optimization/analysis of scale-up variables.

  19. Molecular biological enhancement of coal biodesulfurization. Tenth quarterly technical progress report, [September--December 1991

    Energy Technology Data Exchange (ETDEWEB)

    Litchfield, J.H.; Zupancic, T.J.; Kittle, J.D.; Baker, B.; Palmer, D.T.; Fry, I.J.; Traunero, C.G.; Wyza, R.E.; Schweitzer, A.; Conkle, H.N. [Battelle, Columbus, OH (United States); Chakravanty, L.; Tuovinen, O.H. [Ohio State Univ., Columbus, OH (United States)

    1991-12-13

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The specific technical objectives of the project are to: clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; transfer this pathway into a fast-growing chemolithotrophic bacterium; and conduct a batch-mode optimization/analysis of scale-up variables.

  20. Molecular biological enhancement of coal biodesulfurization. Fourth quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Litchfield, J.H.; Fry, I.; Wyza, R.E.; Palmer, D.T.; Zupancic, T.J.; Conkle, H.N.

    1990-06-14

    The objective of this project is to produce one or more microorganisms capable of removing the organic and inorganic sulfur in coal. The original specific technical objectives of the project were to: clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; transfer this pathway into a fast-growing chemolithotropic bacterium; conduct a batch-mode optimization/analysis of scale-up variables.

  1. Quarterly technical progress report for the period ending June 30, 1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The Magnetohydrodynamics Program (Component Development and Integration Facility) in Butte, Montana, continued its site preparation for the TRW first-stage combustor installation. In the area of flue gas cleanup, our in-house research program is continuing its investigation into the causes of sorbent attrition in PETC's fluidized-bed copper oxide process for simultaneous SO/sub 2//NO/sub x/ removal. Interwoven with these tests is a series of spray dryer/electrostatic precipitator tests that are being conducted with the cooperation of Wheelabrator-Frye, Inc. This test series was completed this quarter, and the data show that when using a Kentucky coal, Wheelabrator-Frye's electrostatic precipitator provides excellent particulate control efficiency while using a spray dryer for sulfur dioxide removal. A unique project at Carnegie-Mellon University is looking at the concept of integrated environmental control for coal-fired power plants making use of precombustion, combustion, and postcombustion control, including systems for the simultaneous removal of more than one pollutant. The objective of this research is to develop a computer model and assessment for integrated environmental control systems that utilize conventional or advanced systems. The Liquid Phase Methanol Project Development Unit in LaPorte, Texas, was restarted after a successful shakedown run was completed. PETC has recently begun an in-house research project aimed at exploring the basic chemistry of liquefying coal in the presence of water under supercritical conditions. In the Alternative Fuels Technology Program, the Gulf Research and Development Company has completed the preliminary testing phase of its erosion test loop. Their results indicate that when pumping a coal-water slurry fuel through a flow loop, the erosion rate increases as velocity increases, suggesting a well-defined relationship between these two parameters.

  2. Quarterly technical progress report for the period ending June 30, 1984

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The Magnetohydrodynamics Program (Component Development and Integration Facility) in Butte, Montana, continued its site preparation for the TRW first-stage combustor installation. In the area of flue gas cleanup, our in-house research program is continuing its investigation into the causes of sorbent attrition in PETC's fluidized-bed copper oxide process for simultaneous SO/sub 2//NO/sub x/ removal. Interwoven with these tests is a series of spray dryer/electrostatic precipitator tests that are being conducted with the cooperation of Wheelabrator-Frye, Inc. This test series was completed this quarter, and the data show that when using a Kentucky coal, Wheelabrator-Frye's electrostatic precipitator provides excellent particulate control efficiency while using a spray dryer for sulfur dioxide removal. A unique project at Carnegie-Mellon University is looking at the concept of integrated environmental control for coal-fired power plants making use of precombustion, combustion, and postcombustion control, including systems for the simultaneous removal of more than one pollutant. The objective of this research is to develop a computer model and assessment for integrated environmental control systems that utilize conventional or advanced systems. The Liquid Phase Methanol Project Development Unit in LaPorte, Texas, was restarted after a successful shakedown run was completed. PETC has recently begun an in-house research project aimed at exploring the basic chemistry of liquefying coal in the presence of water under supercritical conditions. In the Alternative Fuels Technology Program, the Gulf Research and Development Company has completed the preliminary testing phase of its erosion test loop. Their results indicate that when pumping a coal-water slurry fuel through a flow loop, the erosion rate increases as velocity increases, suggesting a well-defined relationship between these two parameters.

  3. Molecular biological enhancement of coal biodesulfurization. Eleventh quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Litchfield, J.H.; Zupancic, T.J.; Kittle, J.D. Jr.; Baker, B.; Palmer, D.T.; Traunero, C.G.; Wyza, R.E.; Schweitzer, A.; Conkle, H.N. [Battelle, Columbus, OH (United States); Chakravarty, L.; Tuovinen, O.H. [Ohio State Univ., Columbus, OH (United States)

    1992-03-13

    The objective of this project is to produce one or more microorganisms capable of the organic and inorganic sulfur in coal. The original specific technical objectives of the project were to: (1) clone and characterize the genes encoding the enzymes of the ``4S`` pathway (sulfoxide/sulfone/sulfonate/sulfate) for release of organic sulfur from coal; (2) return multiple copies of genes to the original host to enhance the biodesulfurization activity of that organism; (3) transfer this pathway into a fast-growing chemolithotrophic bacterium; (4) conduct a batch-mode optimization/analysis of scale-up variables. By letter of September 3, 1991, from the Project Manager at Department of Energy, Pittsburgh Energy Technology Center, these objectives of this project were redirected toward finding and developing suitable vectors for Thiobacillus strains. All work on bacterial strains from Lehigh University was terminated since they did not contain desulfurization traits represented by the ``4S`` pathway.

  4. Redwood Community Action Agency: Technical progress report, 4th quarter, 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    Redwood Community Action Agency (RCAA) has been developing a business plan for a shared-savings energy business under this grant since January, 1986. At this time RCAA is nearing completion of the research activities, although a 90 day no-cost extension has been requested and received to complete activities on this grant. All consultant reports on the technical feasibility analysis and market research activities have been completed at this time. Fifteen thousand dollars of equity capital has been allocated for the business venture being investigated under this grant through an equity grant from the California Department of Economic Opportunity. This money, combined with agency unrestricted funds, will provide the initial seed capital for the venture.

  5. West Hackberry Tertiary Project. Quarterly technical progress report, September 3, 1993--December 3, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Fassihi, M.R.; Gillham, T.H.

    1993-11-30

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoirs for the project are the Camerina C- 1,2,3 Sands located on the west flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project win demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomical.

  6. West Hackberry Tertiary Project. Quarterly technical progress report, March 3, 1993--June 3, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Gillham, T.H.

    1994-09-01

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 Sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. This reservoir has been unitized and is designated as the WH Cam C RI SU. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomic.

  7. Base program on energy related research. Quarterly technical progress report, February--April 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    Progress reports are briefly described for the following areas of research: oil and gas; advanced systems applications; environmental technologies; and applied energy science. Oil and gas research includes: CROW {sup TM} process modeling; and miscible-immiscible gas injection processes. Advanced systems applications covers: development and optimization of a process for the production of a premium sold fuel from western US coals; development of an on-line alkali monitoring probe; optimization of the recycle oil process for eastern oil shale; and process support and development. Environmental technologies has solid waste management; and remediation of contaminated soils.

  8. Decontamination Systems Information and Research Program. Quarterly technical progress report, July 1--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-01

    Progress reports are presented for the following projects: systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies--drain-enhanced soil flushing (DESF) for organic contaminants removal; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors--monolayer and multilayer self-assembled films for chemical sensors; Winfield Lock and Dam remediation; Winfield cleanup survey; assessment of technologies for hazardous waste site remediation--non-treatment technologies and pilot scale test facility implementation; assessment of environmental remediation storage technology; assessment of environmental remediation excavation technology; assessment of environmental remediation monitoring technology; and remediation of hazardous sites with steam reforming.

  9. Innovative Clean Coal Technology (ICCT). Technical progress report, first quarter, 1993, January 1993--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The objective of this project is to demonstrate and evaluate commercially available Selective Catalytic Reduction (SCR) catalysts from U.S., Japanese and European catalyst suppliers on a high-sulfur U.S. coal-fired boiler. SCR is a post-combustion nitrogen oxide (NOx) control technology that involves injecting ammonia into the flue gas generated from coal combustion in an electric utility boiler. The flue gas containing ammonia is then passed through a reactor that contains a specialized catalyst. In the presence of the catalyst, the ammonia reacts with NOx to convert it to nitrogen and water vapor. Although SCR is widely practiced in Japan and Europe on gas-, oil-, and low-sulfur coal-fired boilers, there are several technical uncertainties associated with applying SCR to U.S. coals. These uncertainties include: (1) potential catalyst deactivation due to poisoning by trace metal species present in U.S. coals that are not present in other fuels; (2) performance of the technology and effects on the balance-of-plant equipment in the presence of high amounts of SO{sub 2} and SO{sub 3}; and (3) performance of a wide variety of SCR catalyst compositions, geometries and methods of manufacture under typical high-sulfur coal-fired utility operating conditions. These uncertainties will be explored by constructing a series of small-scale SCR reactors and simultaneously exposing different SCR catalysts to flue gas derived from the combustion of high sulfur U.S. coal. The demonstration will be performed at Gulf Power Company`s Plant Crist Unit No. 5 (75 NM capacity) near Pensacola, Florida. The project will be funded by the U.S. Department of Energy (DOE), Southern Company Services, Inc. (SCS on behalf of the entire Southern electric system), the Electric Power Research Institute (EPRI), and Ontario Hydro. SCS is the participant responsible for managing all aspects of this project.

  10. MHD Coal Fired Flow Facility. Quarterly technical progress report, July-September 1980

    Energy Technology Data Exchange (ETDEWEB)

    Altstatt, M. C.; Attig, R. C.; Brosnan, D. A.

    1980-11-01

    Significant activity, task status, planned research, testing, development, and conclusions for the Magnetohydrodynamics (MHD) Coal-Fired Flow Facility (CFFF) and the Energy Conversion Facility (ECF) are described. On Task 1, the first phase of the downstream quench system was completed. On Task 2, all three combustor sections were completed, hydrotested, ASME code stamped, and delivered to UTSI. The nozzle was also delivered. Fabrication of support stands and cooling water manifolds for the combustor and vitiation heater were completed, heat transfer and thermal stress analysis, along with design development, were conducted on the generator and radiant furnace and secondary combustor installation progressed as planned. Under Task 3 an Elemental Analyzer and Atomic Absorption Spectrophotometer/Graphite Furnace were received and installed, sites were prepared for two air monitoring stations, phytoplankton analysis began, and foliage and soil sampling was conducted using all study plots. Some 288 soil samples were combined to make 72 samples which were analyzed. Also, approval was granted to dispose of MHD flyash and slag at the Franklin County landfill. Task 4 effort consisted of completing all component test plans, and establishing the capability of displaying experimental data in graphical format. Under Task 7, a preliminary testing program for critical monitoring of the local current and voltage non-uniformities in the generator electrodes was outlined, electrode metal wear characteristics were documented, boron nitride/refrasil composite interelectrode sealing was improved, and several refractories for downstream MHD applications were evaluated with promising results.

  11. Critical contributions in MHD power generation. Quarterly technical progress report, June 1--August 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Louis, J.F.

    1977-10-01

    Current research and development in open-cycle coal-fired MHD power generation at Massachusetts Institute of Technology is presented. Progress is reported on the following tasks: (1) Establish chemical, thermal, and electrical data to guide materials selection, develop improved detail designs, and support performance analyses of MHD electrode modules and insulator materials; (2) Parametrically investigate selected electrode properties of critical design importance in chemical, thermal, and electrical environments simulating a coal-fired MHD generator; (3) Develop combustion data pertinent to the design of MHD combustors; this work is intended to determine the combustion characteristics of selected coal feed stock in terms of devolatilization kinetics, char characteristics, and combustion gas chemistry; (4) Establish techniques for the analysis and understanding of critical MHD phenomena which have an important bearing on MHD generator performance; such phenomena include inter-electrode breakdown, time-dependent behavior, effective plasma properties and plasma inhomogeneities; (5) Establish the operating characteristics of an MHD disk generator; (6) Continue work on computer techniques for modeling and for design and cost analysis of MHD components and the overall system; (7) Integrate the engineering data and design criteria, as applicable, which are developed in the above-listed tasks into a model of the MHD channel.

  12. Critical contributions in MHD power generation. Quarterly technical progress report, June 1--August 31, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Louis, J.F.

    1976-10-01

    Research progress on open-cycle coal-fired MHD power generation at Massachusetts Institute of Technology is detailed. Work is reported in the following areas: (1) Establish chemical, thermal, and electrical data to guide materials selection, develop improved detail designs, and support performance analyses of MHD electrode modules and insulator materials; (2) parametrically investigate selected electrode properties of critical design importance in chemical, thermal, and electrical environments simulating a coal-fired MHD generator; (3) develop combustion data pertinent to the design of MHD combustors; (4) establish techniques for the analysis and understanding of critical MHD phenomena which have an important bearing on MHD generator performance; (5) establish the operating characteristics of an MHD disk generator; (6) continue work on computer techniques for modeling and for design and cost analysis of MHD components and the overall system; (7) integrate the engineering data and design criteria, as applicable, which are developed in the above-listed tasks into a model of the MHD channel; (8) U-25 electrode screening tests.

  13. Great Basin paleoenvironmental studies project; Technical progress report, second quarter, September--November, 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    Progress is described in the four tasks associated with this project. Task 1, Paleobotanical studies in the Great Basin, has as its objective the reconstruction of the response of vegetation to climate in order to identify periods of mesic climate at Yucca Mountain during the last 20,000 to 50,000 years. Past extremes in infiltration rates are expected to serve as estimates of climate that may be expected during the next 10,000 years at Yucca Mtn. Task 2, Paleofaunas, will construct a history of Great Basin vertebrates that will provide empirical evidence of past environmental and climatic conditions. The objective of Task 3, Geomorphology, is to document the responses of surficial processes and landforms to the climatic changes documented by studies of packrat middens, pollen, and faunal distributions. The goal of Task 4, Transportation, is to compare the results from three models that have been suggested as appropriate for evaluating flood flows on alluvial fans with the results obtained from the traditional one-dimensional, stochastic model used in previous research for Yucca Mountain. This research looked at three alluvial fans with rail transportation alignments crossing them.

  14. Healy clean coal project. Quarterly technical progress report No. 16-19, October 1, 1994--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    This Quarterly Technical Progress Report is required under U.S. Department of Energy (DOE) Cooperative Agreement, Section XV, {open_quotes}Reporting Requirements{close_quotes} and Attachment C, {open_quotes}Federal Assistance Reporting Checklist{close_quotes}. It covers the period of October 1, 1994 through September 30, 1995. The primary objective of the HCCP is to conduct a cost-sharing project that will demonstrate a new power plant design which features innovative integration of an advanced combustor and heat recovery system coupled with both high and low temperature emission control processes. The parties anticipate that if the demonstration project is successful, the technology could become commercialized in the near term and will be capable of (1) achieving significant reductions in the emissions of sulfur dioxide and the oxides of nitrogen from existing facilities to minimize environmental impacts such as transboundary and interstate pollution and/or (2) providing for future energy needs in an environmentally acceptable manner. The primary equipment elements comprising this new power plant design includes entrained combustion systems coupled with a boiler which will produce low NOx levels, function as a limestone calciner and first stage SO{sub 2} remover in addition to its heat recovery function; a single spray dryer absorber vessel for second stage sulfur removal; a baghouse for third stage sulfur and particulate removal; and a lime activation system which recovers unused reagent from particulate collected in the baghouse. The emission levels Of SO{sub 2}, NOx, and particulate to be demonstrated are expected to be better than the federal New Source Performance Standards (NSPS).

  15. Micropore diffusion in coal chars under reactive conditions: Quarterly technical progress report, 15 September 1986-15 December 1986

    Energy Technology Data Exchange (ETDEWEB)

    Calo, J.M.

    1986-01-01

    This project is concerned with the development of a new technique for measuring the rates of diffusion of gases on the microporous structure of coal chars. Mass transport in pores of molecular dimensions is known to be an activated, relatively slow process. The gasification of coal chars may be transport-limited. To correlate and predict gasification reactivity, it is quite important to know over what range of conditions such limitations may control. The initial transient behavior of a gaseous species exposed to such chars primarily reflects the transport resistance offered by the micropores. When this process is conducted using a well-defined perturbation in a mixed reactor, the diffusion step can often be separated from the subsequent reaction steps, so that measurements can be conducted under actual gasification conditions. We will apply this technique to a few well-characterized coal/carbon chars. Micropore diffusion times in these samples will be determined for various gaseous species relevant to the gasification environments. The primary variables will be temperature and degree of conversion (i.e., burn-off). Measurements will be examined with respect to changes occurring in the pore structure of the chars. In this first quarterly technical progress report, the background and objectives of the study and the requisite experimental preparations to begin the micropore diffusion studies are presented. In particular, during the reporting period: the graduate assistant on this project conducted a literature review of the general area of micropore diffusion and began to acquire the necessary background for the experimental study; the inception of a pore model was undertaken involving micropore diffusion; and the Autoclave Engineers 3'' Berty catalytic reactor has been refurbished and modified for the study. 59 refs., 2 figs.

  16. Quarterly Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    David Gray; Glen Tomlinson

    1998-11-12

    The Federal Energy Technology Center (FETC) at Pittsburgh contracted with the MJTRE Corporation to perform Research Guidance Studies that will assist the Center and other relevant offices in the Department of Energy in evaluating and prioritizing research in the areas of coal and natural gas conversion. MITRE was reorganized in December 1995, which resulted in the formation of Mitretek Systems Inc. Mitretek has been performing this work on MITRE's behalf awaiting completion of contract novation to Mitretek. The contract was novated in February 1998 to Mitretek Systems. The overall objectives of this contract are to provide support to DOE in the following areas: (1) technical and economic analyses of current and future coal-based energy conversion technologies and other similar emerging technologies such as coal-waste coprocessing, natural gas conversion, and biomass conversion technologies for the production of fuels, chemicals and electric power,(2) monitor progress in these technologies with respect to technical, economic, and environmental impact (including climate change), (3) conduct specific and generic project economic and technical feasibility studies based on these technologies, (4) identify long-range R&D areas that have the greatest potential for process improvements, and (5) investigate optimum configurations and associated costs for production of high quality energy products via refining and their performance in end-use applications.

  17. Advanced liquefaction using coal swelling and catalyst dispersion techniques. Quarterly technical progress report, April--June 1992

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, C.W. [Auburn Univ., AL (United States); Gutterman, C. [Foster Wheeler Development Corp., Livingston, NJ (United States); Chander, S. [Pennsylvania State Univ., University Park, PA (United States)

    1992-08-26

    Research in this project centers upon developing a new approach to the direct liquefaction of coal to produce an all-distillate product slate at a sizable cost reduction over current technology. The approach integrates all aspects of the coal liquefaction process including coal selection, pretreatment, coal swelling with catalyst impregnation, coal liquefaction experimentation, product recovery with characterization, alternate bottoms processing, and a technical assessment including an economic evaluation. The project is being carried out under contract to the United States Department of Energy. On May 28, 1992, the Department of Energy authorized starting the experimental aspects of this projects; therefore, experimentation at Amoco started late in this quarterly report period. Research contracts with Auburn University, Pennsylvania State University, and Foster Wheeler Development Corporation were signed during June, 1992, so their work was just getting underway. Their work will be summarized in future quarterly reports. A set of coal samples were sent to Hazen Research for beneficiation. The samples were received and have been analyzed. The literature search covering coal swelling has been up-dated, and preliminary coal swelling experiments were carried out. Further swelling experimentation is underway. An up-date of the literature on the liquefaction of coal using dispersed catalysts is nearing completion; it will be included in the next quarterly report.

  18. Bench-scale testing of on-line control of column flotation using a novel analyzer. Second quarterly technical progress report, January 1, 1993--March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-16

    This document contains the second quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTE{trademark} Column Flotation Technology and PTI`s On-Line Quality Monitor and Control System. The twelve-month project involves installation and testing of a 200--300 lb/hr. bench-scale testing circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) for two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). The project schedule timeline by task series for the twelve month project, as it was laid out in the initial Project Work Plan. At the present time, all tasks are progressing according to schedule with the exception of the Task 800 Circuit Testing and Sample Prep and Task 1000 Circuit Decommissioning, which have slipped approximately five weeks due to delays incurred within in the project.

  19. Micropore diffusion in coal chars under reactive conditions: Quarterly technical progress report, 15 December 1986-15 March 1987. [Effect of activated diffusion in small pores

    Energy Technology Data Exchange (ETDEWEB)

    Calo, J.M.; Perkins, M.T.; Lilly, W.D.

    1987-01-01

    In this second quarterly technical progress report, we present some additional developments concerning the analysis of the effect of activated micropore diffusion on gasification reactivity, and report on progress with the experimental apparatus: (1) The Autoclave Engineers 3'' Berty catalytic reactor has been reassembled and tested, and has been found to function satisfactorily. However, the mass spectrometer malfunctioned and had to be repaired. (2) The effect of sorbate partial pressure on miropore diffusion and gasification reactivity have been examined. It was found that: pressure can have a significant effect on micropore diffusivities; increasing pressure generally increases the microparticle effectiveness factor for pressures far from saturation (while the opposite is true at near-saturation conditions); and the effect of sorbate partial pressure should be considered in conducting and interpreting measurements regarding micropore diffusion. 6 refs., 1 fig., 1 tab.

  20. Space Power MHD (magnetohydrodynamic) System: Third quarterly technical progress report, 1 November 1987-31 January 1988

    Energy Technology Data Exchange (ETDEWEB)

    1988-03-15

    This progress report of the Space Power MHD System project presents the accomplishments during 1 November 1987 through 31 January 1988. The scope of work covered encompasses the definition of an MHD power system conceptual design and development plan (Task 1). Progress included the following: Subcontracts were issued to the MIT Plasma Fusion Center and the Westinghouse R and D Center. The performance of the 100 MW 500 sec. power system was optimized and the design concept finalized, including mass and energy balances. Mass and cost estimates were prepared. A design review was held at DOE/PETC. This also included the review of the technical issues definition and of the R and D Plan. Following the review, a final iteration on the conceptual design was initiated. Formulation of the R and D Plan was continued. Preparation of the Task 1 R and D Report was initiated. 12 figs.

  1. Molten Salt Coal Gasification Process Development Unit. Phase 2. Quarterly technical progress report No. 2, October-December 1980

    Energy Technology Data Exchange (ETDEWEB)

    Slater, M. H.

    1981-01-20

    This represents the second quarterly progress report on Phase 2 of the Molten Salt Coal Gasification Process Development Unit (PDU) Program. Phase 1 of this program started in March 1976 and included the design, construction, and initial operation of the PDU. On June 25, 1980, Phase 2 of the program was initiated. It covers a 1-year operations program utilizing the existing PDU and is planned to include five runs with a targeted total operating time of 9 weeks. During this report period, Run 6, the initial run of the Phase 2 program was completed. The gasification system was operated for a total of 95 h at pressures up to 10 atm. Average product gas HHV values of 100 Btu/scf were recorded during 10-atm operation, while gasifying coal at a rate of 1100 lb/h. The run was terminated when the melt overflow system plugged after 60 continuous hours of overflow. Following this run, melt withdrawal system revisions were made, basically by changing the orifice materials from Monofrax to an 80 Cobalt-20 Chromium alloy. By the end of the report period, the PDU was being prepared for Run 7.

  2. Development of vanidum-phosphate catalysts for methanol production by selective oxidation of methane. Quarterly technical progress report, 1996

    Energy Technology Data Exchange (ETDEWEB)

    McCormick, R.L.; Alptekin, G.O.

    1996-06-01

    Activities this past quarter, focused on acquisition of kinetic data for oxidation of formaldehyde and methanol on these catalysts. In the next quarter these results will be used to propose a simple reaction network and kinetic model. To date we have completed Task 1: Laboratory Setup and Task 2: Process Variable Study. Activities in the current quarter focused on finalizing these tasks and on Task 3: Promoters and Supports, this task is approximately 50% completed. Task 4: Advanced Catalysts is to be initiated in the next quarter. Specific accomplishments this quarter include: finalizing and calibrating a new reaction product analytical system with markedly improved precision and accuracy relative to older. approaches; development of procedures for accurately feeding formaldehyde to the reactor; examination of formaldehyde and methanol oxidation kinetics over vanadyl pyrophosphate at a range of temperatures; and preliminary studies of methane oxidation over a silica support.

  3. POC-scale testing of an advanced fine coal dewatering equipment/technique. Quarterly technical progress report 2, January 1995--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    Groppo, J.G.; Parekh, B.K.

    1995-05-05

    Froth flotation technique is an effective and efficient process for recovering of ultra-fine (minus 74 {mu}m) clean coal. Economical dewatering of an ultra-fine clean coal product to a 20 percent level moisture will be an important step in successful implementation of the advanced cleaning processes. This project is a step in the Department of Energy`s program to show that ultra-clean coal could be effectively dewatered to 20 percent or lower moisture using either conventional or advanced dewatering techniques. The cost-sharing contract effort is for 36 months beginning September 30, 1994. This report discusses technical progress made during the quarter from January 1 to March 31, 1995.

  4. Increased oil production and reserves from improved completion techniques in the Bluebell Field, Uinta Basin, Utah. Seventh quarterly technical progress report, April 1, 1995--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Morgan, C.D.

    1995-09-01

    The objective of this project is to increase oil production and reserves in the Uinta Basin by demonstrating improved completion techniques. Low productivity of Uinta Basin wells is caused by gross production intervals of several thousand feet that contain perforated thief zones, water-bearing zones, and unperforated oil-bearing intervals. Geologic and engineering characterization and computer simulation of the Green River and Wasatch formations in the Bluebell field will determine reservoir heterogeneities related to fractures and depositional trends. This will be followed by drilling and recompletion of several wells to demonstrate improved completion techniques based on the reservoir characterization. Transfer of the project results will be an ongoing component of the project. Technical progress for this quarter are discussed for subsurface and engineering studies.

  5. Separation of flue-gas scrubber sludge into marketable products. Third year, second quarterly technical progress report, December 1, 1995--February 29, 1996 (Quarter {number_sign}10)

    Energy Technology Data Exchange (ETDEWEB)

    Kawatra, S.K.; Eisele, T.C.

    1996-03-01

    To reduce their sulfur emissions, many coal-fired electric power plants use wet flue-gas scrubbers. These scrubbers convert sulfur oxides into solid sulfate and sulfite sludge, which must then be disposed of. Knowledge of scrubber sludge characteristics is necessary for the development of purification technologies which will make it possible to directly utilize scrubber sludges rather than landfilling them. This project is studying the use of minimal-reagent froth flotation as the purification process, using the surface properties of the particles of unreacted limestone to remove them and their associated impurities from the material, leaving a purified calcium sulfite/gypsum product. In the current quarter, research was focused on two different areas. The first part of this quarter the optimization of the feed slurry percent solids for the two inch water-only cyclone was completed. The optimization of the vortex finder, spigot diameter and inlet feed pressure was completed in the previous quarter. The second part of this quarter began the investigation of why water-only cycloning helps froth flotation performance. The hypothesis is that water-only cycloning scrubs the surface of the unreacted limestone. This scrubbing effect provides a clean calcium carbonate surface, which results in better flotation reagent adsorption. This study used the scanning electron microscope to investigate the surface of the unreacted limestone particles.

  6. Technical Progress Report for PEPCO: Turbo-Z Battery Charging System. Calendar Quarter Ending March 31, 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-04-01

    The project is proceeding at a rapid pace now. The software is in development for the control board and the test stand. Portions of the writing and debugging of this software have been in conjunction with the hardware development. The software now interfaces with all the measurement instruments and displays the measurements on the screen, and it saves the measurements to a disc file. There is still cleanup work to do on the display items. Work must still be imparted to the code to control a charging sequence while taking measurements of the results. The test stand hardware has received a good development effort this quarter. The timer-counter board is working in the computer. This board paces the measurement cycle and times the discharge pulse (whine circuit). The thermocouple multiplexer is scanning at the same time the analog to digital converter is taking measurements. We have made a good number of hardware modifications to solve problems revealed while writing the software. The power factor correction for the charger power section is still in development. The engineers have found additional sources for the PFC chips, and they have obtained more technical data sheets and acquired samples. The control board schematics are complete, and the software is far along in the development phase. The functions of the control board have been detailed. The control board must next be integrated with the power supply unit. The next phase of development will concentrate on integrating the components together. At this time, the final debugging of the hardware and software will begin. Additionally, the capacitive coupler development is proceeding. The annual DARPA/DoT Advanced Transportation review will be held on May 16, 1999. We expect to learn the status of our project proposal during this conference. Should we more forward, UL has agreed to help us determine the design requirements of the complete charging system at their EV testing facility, prior to manufacturing. This

  7. BX in-situ oil-shale project. Quarterly technical progress report, June 1, 1981-August 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1981-09-20

    June 1, 1981-August 31, 1981 was the third consecutive quarter of superheated steam injection at the BX In Situ Oil Shale Project. Injection was continuous except for the period of July 14th to August 1st when the injection was suspended during the drilling of core hole BX-37. During the quarter, 99,760 barrels of water as superheated steam were injected into Project injection wells at an average well head temperature of 752/sup 0/F and an average wellhead pressure of 1312 PSIG. During the same period, 135,469 barrels of fluid were produced from the Project production wells for a produced to injected fluid ratio of 1.36 to 1.0. Net oil production during the quarter was 38 barrels.

  8. High octane ethers from synthesis gas-derived alcohols. Quarterly technical progress report, July--September 1993

    Energy Technology Data Exchange (ETDEWEB)

    Klier, K.; Herman, R.G.; Feeley, O.C.; Johansson, M.A.

    1993-11-01

    The objective of the proposed research is to synthesize oxygenated fuel ethers, primarily methyl isobutyl ether (MIBE) and methyl tertiary butyl ether (MTBE), directly from coal-derived H{sub 2}/CO/CO{sub 2} synthesis via alcohol mixtures that are rich in methanol and 2-methyl-1-proanol (isobutanol). The overall scheme involves gasification of coal, purification and shifting of the synthesis gas, higher alcohol synthesis, and direct synthesis of ethers. Both organic and inorganic catalysts will be investigated, and the better catalysts will be subjected to long term performance studies. The project is divided into the following three tasks: (1) synthesis of high octane ethers from alcohol mixtures containing predominantly methanol and 2-methyl-1-propanol over superacid resins, (2) inorganic catalysts for the synthesis of high octane ethers form alcohols, and (3) long term performance and reaction engineering for scale-up of the alcohols-to-ether process. A summary of technical progress is provided in this report.

  9. Support of enhanced oil recovery to independent producers in Texas. Quarterly technical progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Fotouh, K.H.

    1995-09-30

    The main objective of this project is to support independent oil producers in Texas and to improve the productivity of marginal wells utilizing enhanced oil recovery techniques. The main task carried out this quarter was the generation of an electronic data base.

  10. Bench-scale testing of on-line control of column flotation using a novel analyzer. Quarterly technical progress report, September 21, 1992--December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-22

    This document contains the first quarterly technical progress report for PTI`s Bench-Scale Testing Project of a circuit integrating PTI`s KEN-FLOTETM Column Flotation Technology and PTI`s On-Line Quality Monitor Control System. The twelve-month project will involve installation of a 300 lb/hr. bench-scale testing circuit at PETC`s Coal Preparation Process Research Facility (CPPRF) and testing of two bituminous coals (Upper Freeport and Pittsburgh No. 8 Seam Raw Coals). Figure 1 contains the project plan as well as the approach to completing the major tasks within the twelvemonth project. The project is broken down into three phases, which include: Phase I - Preparation: The preparation phase was performed principally at PTI`s Calumet offices from October through December, 1992. It involved building of the equipment and circuitry, as well as some preliminary design and equipment testing. Phase II - ET Circuit Installation and Testing: This installation and testing phase of the project will be performed at PETC`s CPPRF from January through May, 1993, and will be the major focus of the project. It will involve testing of the continuous 300 lb/hr. circuit. Phase II - Project Finalization: The project finalization phase will occur from June through September, 1993, at PTI`s Calumet offices and will involve finalizing analytical work and data evaluation, as well as final project reporting. This quarterly progress report principally summarizes the results from the Phase I preparation work and the plan for the early portions of the Phase 11 installation and commissioning, which will occur in January and the first week of February, 1993.

  11. Development of molten carbonate fuel cell power plant. Quarterly technical progress report, February 1-April 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, J. R.

    1980-01-01

    Work has been initiated during this first quarter under all four program tasks and by all major participants as described. Task 1.0 activity (establish power plant reference design) concentrated upon definition of user requirements and establishment of power plant subsystem alternatives and characteristics. Task 2.0 work (stack and cell design development and verification) was initiated with a heavy emphasis upon test facilities preparation. A total of 27 laboratory cells were operated during this reporting period and a total of nine cells continued on test at the end of the quarter. Investigation of alternative anode and cathode materials proceeded; a dual-porosity anode was fabricated and tested. Over 10,000 endurance hours on a state-of-the-art cell carried-over from a previous program has been achieved and 1500 hours endurance has been obtained with sheet metal cells. Results presented for electrolyte structure development include comparative data for spray-dried and modified aqueous slurry process powders. Shake-down tests with a rotating disc electrode apparatus for fundamental measurements are described. Concept designs for both prototype and subscale stacks have been identified. Task 3.0 effort (development capability for full-scale stack tests) included preparation of an overall test plan to commercialization for molten carbonate fuel cells and of a functional specification for the tenth-scale stack test facility; drafts of both documents were completed for internal review. Cost-effective manufacturing assessment of available designs and processes was initiated. Task 4.0 work (develop capabilities for operation of stacks on coal-derived gas) included gathering of available contaminants concentration and effects information and preparation of initial projections of contaminant ranges and concentrations. Accomplishments to date and activities planned for the next quarter are described.

  12. Thin films of gallium arsenide on low-cost substrates. Quarterly technical progress report No. 8 and topical report No. 3, April 2-July 1, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Ruth, R.P.; Dapkus, P.D.; Dupuis, R.D.; Johnson, R.E.; Manasevit, H.M.; Moudy, L.A.; Yang, J.J.; Yingling, R.D.

    1978-07-01

    The seventh quarter of work on the contract is summarized. The metalorganic chemical vapor deposition (MO-CVD) technique has been applied to the growth of thin films of GaAs and GaAlAs on inexpensive polycrystalline or amorphous substrate materials (primarily glasses and metals) for use in fabrication of large-area low-cost photovoltaic device structures. Trimethylgallium (TMG), arsine (AsH/sub 3/), and trimethylaluminum (TMAl) are mixed in appropriate concentrations at room temperature in the gaseous state and pyrolyzed at the substrate, which is heated in a vertical reactor chamber to temperatures of 725 to 750/sup 0/C, to produce the desired film composition and properties. The technical activities during the quarter were concentrated on (1) a continuing evaluation of various graphite materials as possible substrates for MO-CVD growith of the polycrystalline GaAs solar cells; (2) attempts to improve the quality (especially the grain size) of polycrystalline GaAs films on Mo sheet and Mo/glass substrates by using HCl vapor during the MO-CVD growith process; (3) further studies of the transport properties of polycrystalline GaAs films, wth emphasis on n-type films; (4) continuing investigations of the properties of p-n junctions in polycrystalline GaAs, with emphasis on the formation and properties of p/sup +//n/n/sup +/ deposited structures; and (5) assembling apparatus and establishing a suitable technique for producing TiO/sub 2/ layers for use as AR coatings on GaAs cells. Progress is reported. (WHK)

  13. Aluminum-alloy processing of Th- and U-based fuels. Quarterly technical progress report, April-June 1978

    Energy Technology Data Exchange (ETDEWEB)

    Lukens, H.R.; Bryan, D.E.; MacKenzie, J.K.; Preskitt, C.A.; Rock, D.H.; Selph, W.E.; Snellen, G.; Snowden, D.P.; Teitel, R.J.

    1978-06-15

    The objective of the work is to develop economically feasible, proliferation-proof flowsheets for the reprocessing of Th- and U-based fuels with aluminum as a key solvent element. Included within this objective are such considerations as compatible head-end and finishing steps, materials recycling, fission-product disposal, and hot-processing. An important goal of the program is that there not be a complete separation of fissile isotopes from nonfissile heavy metals at any point in the process. Demonstration of a suitable process is the final objective of the current project. During the present quarter several new alternative flowsheets have been formulated that reflect both the contributions of data obtained in an ongoing literature survey and concepts that seem worth investigating with respect to project goals. Also, experimental work is now under way toward the gathering of essential data that is not in the literature. 7 figures.

  14. Photovoltaic mechanisms in polycrystalline thin film silicon solar cells. Quarterly technical progress report No. 1, July 30-October 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Sopori, B.

    1980-07-30

    Major accomplishments during the first quarter of the contract period are reported. Small area diode fabrication and analysis has been continued. This technique has further been applied to many RTR ribbons. An optical technique for determination of crystallite orientations has been placed in operation. This technique has many distinct advantages. These are: (1) rapid; (2) can be set-up very inexpensively; (3) well suited for polycrystalline substrates of small grain size; and (4) can easily characterize twins. Accuracies obtained with this technique are about the same as that of the Laue technique. A technique to qualitatively evaluate grain boundary activity in unprocessed substrates has been used and valuable results obtained. Further analysis is being done to use this technique for quantitative evaluation. A major study of G.B. orientation effects is underway. Initial results on RTR ribbons have shown a good correlation of G.B. barrier height with misorientation (tilt boundaries).

  15. Development of vanadium-phosphate catalysts for methanol production by selective oxidation of methane. Quarterly technical progress report 10, July 1, 1995--September 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    McCormick, R.L.

    1995-12-07

    This document is the tenth quarterly technical progress report under Contract No. DE-AC22-92PC92110 {open_quotes}Development of Vanadium-Phosphate Catalysts for Methanol Production by Selective Oxidation of Methane{close_quotes}. Activities focused on testing of additional modified and promoted catalysts and characterization of these materials. Attempts at improving the sensitivity of our GC based analytical systems were also made with some success. Methanol oxidation studies were initiated. These results are reported. Specific accomplishments include: (1) Methane oxidation testing of a suite of catalysts promoted with most of the first row transition metals was completed. Several of these materials produced low, difficult to quantify yields of formaldehyde. (2) Characterization of these materials by XRD and FTIR was performed with the goal of correlating activity and selectivity with catalyst properties. (3) We began to characterize catalysts prepared via modified synthesis methods designed to enhance acidity using TGA measurements of acetonitrile chemisorption and methanol dehydration to dimethyl ether as a test reaction. (4) A catalyst prepared in the presence of naphthalene methanol as a structural disrupter was tested for activity in methane oxidation. It was found that this material produced low yields of formaldehyde which were difficult to quantify. (5) Preparation of catalysts with no Bronsted acid sites. This was accomplished by replacement of exchangeable protons with potassium, and (6) Methanol oxidation studies were initiated to provide an indication of catalyst activity for decomposition of this desired product and as a method of characterizing the catalyst surface.

  16. Design, construction, operation, and evaluation of a prototype culm combustion boiler/heater unit. Quarterly technical progress report, October 1-December 21, 1981

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    This report provides a summary of the work performed on the Prototype Culm Combustion Boiler/Heater Unit, Phase I - Engineering Design and Analysis, Phase II - Prototype Plant Construction and Phase III - Start-Up and Operation during the period October 1, 1981 through December 31, 1981. The objectives of the program as well as the technical progress and problem areas encountered during the reporting period are presented. Seven shakedown tests were run. Start-up and shakedown testing was completed. Four parametric tests were run. Performance data are presented with the exception of boiler efficiency which will be reported once chemical analyses are completed. Total boiler operation time through the end of this quarter - 1225 h, 50 min; operating time on culm and culm/limestone - 682 h, 43 min. Inspection revealed no problems with boiler tube wear. Sulfur capture greater than 94% was demonstrated (design is 88%). A turndown of better than 4 to 1 was shown (design is 2.5 to 1). Computer control of most of the loops has been successful and manual control was also demonstrated.

  17. Novel bimetallic dispersed catalysts for temperature-programmed coal liquefaction. Quarterly technical progress report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chunshan; Schmidt, E.; Schobert, H.H.

    1996-01-01

    Coal liquefaction involves cleavage of methylene, dimethylene and ether bridges connecting polycyclic aromatic units and the reactions of various oxygen functional groups. Here in this quarterly, we report on the hydrocracking of 4-(l-naphthylmethyl)bibenzyl in the presence of iron (Fe) catalysts and sulfur and residual wall catalytic effect. Catalytic hydrocracking of 4-(1-naphthylmethyl)bibenzyl (NMBB) predominantly yielded naphthalene and 4-methylbibenzyl. Various iron compounds were examined as catalyst precursors. Sulfur addition to most catalyst precursors led to substantially higher catalyst activity and higher conversion. NMBB was also treated with sulfur in the absence of iron compounds, in concentrations of 1.2-3.4 wt%, corresponding to the conditions present in reactions with added iron compounds. Increasing sulfur concentrations led to higher NMBB conversions. Furthermore, sulfur had a permanent effect on the reactor walls. A black sulfide layer formed on the surface which could not be removed mechanically. The supposed non-catalytic reactions done in the same reactor but after experiments with added sulfur showed higher conversions than comparable experiments done in new reactors. This wall catalytic effect can be reduced by treating the sulfided reactors with hydrochloric acid. The results of this work demonstrate the significant effect of sulfur addition and sulfur-induced residual wall effects on carbon-carbon bond cleavage and hydrogenation of aromatics.

  18. Centrifugal slurry pump wear and hydraulic studies. Quarterly technical progress report, January 1, 1987--March 31, 1987

    Energy Technology Data Exchange (ETDEWEB)

    Bonney, G.E. [Ingersoll-Rand Co., Phillipsburg, NJ (United States)

    1987-01-01

    The following report marks the third quarter of the third phase of the centrifugal slurry pump improvement program. The program was begun in 1982 for the purpose of improving the operating life of centrifugal slurry pumps for coal liquefaction service. This phase of work will verify the design of a pump at higher speed operation. Eventual scale-up of the prototype slurry pumps to full-scale synthetic fuel generation plants could require ten times the flow. The higher speed will allow pumps to be smaller with respectable efficiencies. Conversely, without increasing the specific speed of the pump design, the eventual size would be more than triple that of the prototype slurry pump. The prototype slurry pump during this phase of the program incorporated all the features proven in the earlier phases of the program. This new, higher specific speed pump will be tested for the ability of the hydraulic design to inhibit wear. It will be tested and compared to the previous optimum prototype slurry pump of this program.

  19. A characterization and evaluation of coal liquefaction process streams. Quarterly technical progress report, April 1--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1995-09-01

    The objectives of this project are to support the DOE direct coal liquefaction process development program and to improve the useful application of analytical chemistry to direct coal liquefaction process development. Independent analyses by well-established methods will be obtained of samples produced in direct coal liquefaction processes under evaluation by DOE. Additionally, analytical instruments and techniques which are currently underutilized for the purpose of examining coal-derived samples will be evaluated. The data obtained from this study will be used to help guide current process development and to develop an improved data base on coal and coal liquids properties. A sample bank will be established and maintained for use in this project and will be available for use by other researchers. The reactivity of the non-distillable resids toward hydrocracking at liquefaction conditions (i.e., resid reactivity) will be examined. From the literature and data experimentally obtained, a mathematical kinetic model of resid conversion will be constructed. It is anticipated that such a model will provide insights useful for improving process performance and thus the economics of direct coal liquefaction. The paper describes activities carried out this quarter. 11 refs., 21 figs., 17 tabs.

  20. Quarterly Technical Progress Report of Radioisotope Power System Materials Production and Technology Program tasks for April 2000 through June 2000

    Energy Technology Data Exchange (ETDEWEB)

    Moore, J.P.

    2000-10-23

    The Office of Space and Defense Power Systems (OSDPS) of the Department of Energy (DOE) provides Radioisotope Power Systems (RPS) for applications where conventional power systems are not feasible. For example, radioisotope thermoelectric generators were supplied by the DOE to the National Aeronautics and Space Administration for deep space missions including the Cassini Mission launched in October of 1997 to study the planet Saturn. The Oak Ridge National Laboratory (ORNL) has been involved in developing materials and technology and producing components for the DOE for more than three decades. For the Cassini Mission, for example, ORNL was involved in the production of carbon-bonded carbon fiber (CBCF) insulator sets, iridium alloy blanks and foil, and clad vent sets (CVSs) and weld shields (WSs). This quarterly report has been divided into three sections to reflect program guidance from OSDPS for fiscal year (FY) 2000. The first section deals primarily with maintenance of the capability to produce flight quality carbon-bonded carbon fiber (CBCF) insulator sets, iridium alloy blanks and foil, clad vent sets (CVSs), and weld shields (WSs). In all three cases, production maintenance is assured by the manufacture of limited quantities of flight quality (FQ) components. The second section deals with several technology activities to improve the manufacturing processes, characterize materials, or to develop technologies for two new RPS. The last section is dedicated to studies of the potential for the production of 238Pu at ORNL.

  1. Quarterly Technical Progress Report of Radioisotope Power System Materials Production and Technology Program tasks for January 2000 through March 2000

    Energy Technology Data Exchange (ETDEWEB)

    Moore, J.P.

    2000-08-18

    The Office of Space and Defense Power Systems (OSDPS) of the Department of Energy (DOE) provides radioisotope Power Systems (BPS) for applications where conventional power systems are not feasible. For example, radioisotope thermoelectric generators were supplied by the DOE to the National Aeronautics and Space Administration for deep space missions including the Cassini Mission launched in October of .I 997 to study the planet Saturn. The Oak Ridge National Laboratory (ORNL) has been involved in developing materials and technology and producing components for the DOE for more than three decades. For the Cassini Mission, for example, ORNL was involved in the production of carbon-bonded carbon fiber (CBCF) insulator sets, iridium alloy blanks and foil, and clad vent sets (CVSs) and weld shields (WSs). This quarterly report has been divided into three sections to reflect program guidance from OSDPS for fiscal year (FY) 2000. The first section deals primarily with maintenance of the capability to produce flight quality carbon-bonded carbon fiber (CBCF) insulator sets, iridium alloy blanks and foil, clad vent sets (CVSs), and weld shields (WSs). In all three cases, production maintenance is assured by the manufacture of limited quantities of flight quality (FQ) components. The second section deals with several technology activities to improve the manufacturing processes, characterize materials, or to develop technologies for two new RPS. The last section is dedicated to studies of the potential for the production of 238Pu at OBNL.

  2. Vacuum deposited polycrystalline silicon films for solar cell applications. Second quarterly technical progress report. January 1-March 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Feldman, C.; Arlington, III, C. H.; Blum, N. A.; Satkiewicz, F. G.

    1980-05-01

    A careful study of a specially formed thin silicon layer on TiB/sub 2/-coated sapphire reveals that the interaction layer of TiSi/sub 2/ is composed of larger grains. Processing steps were developed which lead closer to the goal of fabricating polycrystalline silicon photovoltaic devices completely by vacuum deposition. Both n-type and p-type silicon are now being deposited. New deposition masks were made for depositing the n-regions upon the p-layers. New electrode deposition masks were also made for a direct electroding process to replace the photolithographic process used previously. The TiB/sub 2/ bottom electrode fabrication has been achieved in a single vacuum chamber. Reaction constants and activation energy for TiB/sub 2/ layer formation were determined to be less than those reported by other authors for bulk material. Studies of crystallite growth and interfacial interactions have continued. Major sources of undesirable impurities have been identified and removed from the vacuum chambers. The changes made this quarter have not been incorporated into a completed photovoltaic device.

  3. Silicon ribbon growth by a capillary action shaping technique. Annual report (Quarterly technical progress report No. 9)

    Energy Technology Data Exchange (ETDEWEB)

    Schwuttke, G.H.; Ciszek, T.F.; Kran, A.

    1977-10-01

    Progress on the technological and economical assessment of ribbon growth of silicon by a capillary action shaping technique is reported. Progress in scale-up of the process from 50 mm to 100 mm ribbon widths is presented, the use of vitreous carbon as a crucible material is analyzed, and preliminary tests of CVD Si/sub 3/N/sub 4/ as a potential die material are reported. Diffusion length measurements by SEM, equipment and procedure for defect display under MOS structure in silicon ribbon for lifetime interpretation, and an assessment of ribbon technology are discussed. (WHK)

  4. Silicon ribbon growth by a capillary action shaping technique. Annual report (Quarterly technical progress report No. 9)

    Energy Technology Data Exchange (ETDEWEB)

    Schwuttke, G.H.; Ciszek, T.F.; Kran, A.

    1977-10-01

    Progress on the technological and economical assessment of ribbon growth of silicon by a capillary action shaping technique is reported. Progress in scale-up of the process from 50 mm to 100 mm ribbon widths is presented, the use of vitreous carbon as a crucible material is analyzed, and preliminary tests of CVD Si/sub 3/N/sub 4/ as a potential die material are reported. Diffusion length measurements by SEM, equipment and procedure for defect display under MOS structure in silicon ribbon for lifetime interpretation, and an assessment of ribbon technology are discussed. (WHK)

  5. Low-rank coal research under the UND/DOE cooperative agreement. Quarterly technical progress report, July-September 1983

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, G.A. Jr.

    1983-01-01

    Two long gasification tests were accomplished (66 and 72 hours of slagging operation) this quarter, and the balance of the wastewater needed for the second cooling tower (CT) test (approx. 11,000 gallons) was generated. Eleven thousand gallons of slagging fixed-bed gasifier (SFBG) wastewater were solvent extracted and ammonia stripped (AS) to nominal levels of 160 mg/1 phenol and 600 mg/1 NH/sub 3/. This wastewater is being further treated by activated sludge (AS) and granular activated carbon (GAC) processing to prepare a high quality makeup for the second CT test. Phenol mass balances indicated that > 90 pct of the phenol was stripped from the tower, indicating that previous assumptions of high levels of biodegradation were erroneous. Over 80 pct of the ammonia and about 25 pct of the methanol were also stripped. Data collected during steady state operation of the bench-scale rotating biological contractor indicate complete removal of phenolics and alcohols, and 94 pct removal of BOD. Nitrification also occurred in this unit, with over 30 pct removal of ammonia. Problems due to individual bacteria, present in the biotreated wastewater, passing through the multi-media filter and thus decreasing the carbon adsorption efficiency of the GAC system, have resulted in lower treatment rates than originally anticipated. As a result, to achieve the desired treatment, the contact time of the wastewater with the carbon in the granular activated carbon system has been increased. Since this has decreased the treatment rate, a larger carbon adsorption system has been designed and is presently being constructed.

  6. Engineering Development of Slurry Bubble Column Reactor (SBCR) Technology: Final quarterly technical progress no. 2, 1 July - 30 September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Toseland, B.A.; Tischer, R.E.

    1997-12-31

    The major technical objectives of this program are threefold: (1) to develop the design tools and a fundamental understanding of the fluid dynamics of a slurry bubble column reactor to maximize reactor productivity, (2) to develop the mathematical reactor design models and gain an understanding of the hydrodynamic fundamentals under industrially relevant process conditions, and (3) to develop an understanding of the hydrodynamics and their interaction with the chemistries occurring in the bubble column reactor. Successful completion of these objectives will permit more efficient usage of the reactor column and tighter design criteria, increase overall reactor efficiency, and ensure a design that leads to stable reactor behavior when scaling up to large diameter reactors.

  7. Advanced liquefaction using coal swelling and catalyst dispersion techniques. Quarterly technical progress report No. 7, April 1993--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, C.W. [Auburn Univ., AL (United States); Chander, S. [Pennsylvania State Univ., University Park, PA (United States); Gutterman, C.

    1994-09-01

    The overall objective of this project is to develop a new approach for the direct liquefaction of coal to produce an all-distillate product slate at a sizable cost reduction over current technology. The approach integrates coal selection, pretreatment, coal swelling with catalyst impregnation, liquefaction, product recovery with characterization, alternate bottoms processing, and carrying out a technical assessment including an economic evaluation. The project is being carried out under contract to the United States Department of Energy. All three coals used in this study (Black Thunder, Burning Star bituminous, and Martin Lake lignite) are effectively swelled by a number of solvents. The most effective solvents are those having hetero-functionality. In addition, a synergistic effect has been demonstrated, in which solvent blends are more effective for coal swelling than the pure solvents alone. Therefore, it will be necessary to use only low levels of swelling agents and yet promote the impregnation of catalyst precursors. The rate of the impregnation of catalyst precursors into swollen coal increases greatly as the effectiveness of the solvent to swell the coal increases. This effect is also demonstrated by improved catalyst precursor impregnation with increased contact temperature. Laboratory- and bench-scale liquefaction experimentation is underway using swelled and catalyst impregnated coal samples. Higher coal conversions were observed for the SO{sub 2}-treated coal than the raw coal, regardless of catalyst type. Conversions of swelled coal were highest when Molyvan-L, molybdenum naphthenate, and nickel octoate, respectively, were added to the liquefaction solvent.

  8. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations.

  9. Low-rank coal research under the UND/DOE cooperative agreement. Quarterly technical progress report, April 1983-June 1983

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, Jr., G. A.

    1983-01-01

    Progress reports are presented for the following tasks: (1) gasification wastewater treatment and reuse; (2) fine coal cleaning; (3) coal-water slurry preparation; (4) low-rank coal liquefaction; (5) combined flue gas cleanup/simultaneous SO/sub x/-NO/sub x/ control; (6) particulate control and hydrocarbons and trace element emissions from low-rank coals; (7) waste characterization; (8) combustion research and ash fowling; (9) fluidized-bed combustion of low-rank coals; (10) ash and slag characterization; (11) organic structure of coal; (12) distribution of inorganics in low-rank coals; (13) physical properties and moisture of low-rank coals; (14) supercritical solvent extraction; and (15) pyrolysis and devolatilization.

  10. High resolution, low cost solar cell contact development. Quarterly technical progress and schedule report, September 28, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Mardesich, N.

    1980-01-01

    The scope of the contract covers the development and evaluation of forming solar cell collector grid contacts by the MIDFILM process. This is a proprietary process developed by the Ferro Corporation which is a subcontractor for the program. The MIDFILM process attains line resolution characteristics of photoresist methods with processing related to screen printing. The surface to be processed is first coated with a thin layer of photoresist material. Upon exposure to ultraviolet light through a suitable mask, the resist in the non-pattern area cross-links and becomes hard. The unexposed pattern areas remain tacky. The conductor material is applied in the form of a dry mixture of metal and frit particles which adhere to the tacky pattern area. The assemblage is then fired to ash the photopolymer and sinter the fritted conductor powder. Effort was concentrated during this period on the establishment, optimization and identification of problem areas of the MIDFILM process. Progress is reported. (WHK)

  11. Coal-fired combustion system for industrial process heating applications. Quarterly technical progress report, April 1995--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    PETC has implemented a number of advanced combustion research projects that will lead to the establishment of a broad, commercially acceptable engineering data base for the advancement of coal as the fuel of choice for boilers, furnaces, and process heaters. This includes new installations and those existing installations that were originally designed for oil or gas firing. The data generated by these projects must be sufficient for private-sector decisions on the feasibility of using coal as the fuel of choice. This work should also provide incentives for the private sector to continue and expand the development, demonstration, and application of these combustion systems. Vortec Corporation`s Coal-Fired Combustion System for Industrial Process Heating Applications is being developed under contract DE-AC22-91PC91161 as part of this DOE development program. The current contract represents the third phase of a three-phase development program. Phase I of the program addressed the technical and economic feasibility of the process, and was initiated in 1987 and completed 1989. Phase II was initiated in 1989 and completed in 1990. During Phase II of the development, design improvements were made to critical components and the test program addressed the performance of the process using several different feedstocks. Phase III of the program was initiated September 1991 and is scheduled for completion in 1994. The Phase III research effort is being focused on the development of a process heater system to be used for producing value-added vitrified glass products from boiler/incinerator ashes and selected industrial wastes.

  12. Innovative Clean Coal Technology (ICCT). Technical progress report, second & third quarters, 1993, April 1993--June 1993, July 1993--September 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The objective of this project is to demonstrate and evaluate commercially available Selective Catalytic Reduction (SCR) catalysts from U.S., Japanese, and European catalyst suppliers on a high-sulfur U.S. coal-fired boiler. SCR is a post-combustion nitrogen oxide (NOx) control technology that involves injecting ammonia into the flue gas generated from coal combustion in an electric utility boiler. The flue gas containing ammonia is then passed through a reactor that contains a specialized catalyst. In the presence of the catalyst, the ammonia reacts with NOx to convert it to nitrogen and water vapor. Although SCR is widely practiced in Japan and Europe on gas-, oil-, and low-sulfur coal-fired boilers, there are several technical uncertainties associated with applying SCR to U.S. coals. These uncertainties include: (1) potential catalyst deactivation due to poisoning by trace metal species present in U.S. coals that are not present in other fuels; (2) performance of the technology and effects on the balance-of-plant equipment in the presence of high amounts of SO{sub 2} and SO{sub 3}; and (3) performance of a wide variety of SCR catalyst compositions, geometries and methods of manufacture under typical high-sulfur coal-fired utility operating conditions. These uncertainties are being explored by constructing and operating a series of small-scale SCR reactors and simultaneously exposing different SCR catalysts to flue gas derived from the combustion of high sulfur U.S. coal. The demonstration is being performed at Gulf Power Company`s Plant Crist Unit No. 5 (75 MW capacity) near Pensacola, Florida. The project is funded by the U.S. Department of Energy (DOE), Southern Company Services, Inc. (SCS on behalf of the entire Southern electric system), the Electric Power Research Institute (EPRI), and Ontario Hydro. SCS is the participant responsible for managing all aspects of this project.

  13. Heterogeneous kinetics of coal gasification. Quarterly technical progress report, 1 May 1982-31 July 1982. [Equipment design

    Energy Technology Data Exchange (ETDEWEB)

    Calo, J.M.

    1982-08-01

    During the reporting period significant progress was made on two fronts: (1) the steam addition system for transient steam-char kinetic experiments; and (2) the automated data acquisition system for rapid mass programming (control) of the mass spectrometer and data logging. Steam Addition System: Although it is a relatively straightforward matter to produce steam for the reactor, we found that it is quite a challenge to develop a system capable of maintaining a steady and accurately-known flow rate of steam-argon mixtures at high pressure and temperature in alternate flow circuits (i.e., the reactor and purge lines), while simultaneously protecting downstream valving and instrumentation. Thus, the scheme originally proposed has been modified to eliminate potential operating problems associated with the preliminary design. Automated Data Acquisition System: Although the CO/sub 2/ gasification data were obtained manually, the ultimate objective of the project to develop a quantitative understanding of the complete gasification rate process in the complex synthesis gas milieux calls for automated programming (control) of the mass spectrometer. In addition, the current mass spectrometer signal processing technique requires the use of a lock-in amplifier to extract the modulated portion of the total signal due to the beam species only, in an analog mode. In order to allow fast scanning of a number of species, the characteristic dwell time required by the lock-in amplifier on a particular mass peak must be decreased. These requirements are being met by implementing automated mass programming and data collection, and direct digital, phase-sensitive pulse counting.

  14. LFCM vitrification technology. Quarterly progress report, April-June 1985

    Energy Technology Data Exchange (ETDEWEB)

    Burkholder, H.C.; Jarrett, J.H.; Minor, J.E. (comps.)

    1986-01-01

    This report is compiled by the Nuclear Waste Treatment Program and the Hanford Waste Vitrification Program at Pacific Northwest Laboratory to document progress on liquid-fed ceramic melter (LFCM) vitrification technology. Progress in the following technical subject areas during the third quarter of FY 1985 is discussed: pretreatment systems, melting process chemistry and glass development, feed preparation and transfer systems, melter systems, canister filling and handling systems, off-gas systems, process/product modeling and control, and supporting studies.

  15. Advanced Reactor Safety Research Division. Quarterly progress report, January 1-March 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Agrawal, A.K.; Cerbone, R.J.; Sastre, C.

    1980-06-01

    The Advanced Reactor Safety Research Programs quarterly progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR Safety Evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

  16. Advanced Reactor Safety Research Division. Quarterly progress report, April 1-June 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Romano, A.J.

    1980-01-01

    The Advanced Reactor Safety Research Programs Quarterly Progress Report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR safety evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

  17. Valve development for coal gasification plants. Phase II. Monthly/quarterly technical program report, January--March 1979

    Energy Technology Data Exchange (ETDEWEB)

    Bellezza, D.

    1979-04-01

    The eleventh in a series of Quarterly Technical Progress Reports relating to the Valve Development for Coal Gasification Plants Program discusses engineering progress during the period of January to March 1979.

  18. Active sites in char gasification. Quarterly technical progress report, 1 January 1984-31 March 1984. [Polymers of phenol-formaldehyde family; chars produced from model compounds

    Energy Technology Data Exchange (ETDEWEB)

    Calo, J.M.; Suubers, E.M.; Wojtowicz, M.; Lilly, W.

    1984-05-01

    This project is concerned with the study of the nature and behavior of active sites in gasification of chars produced from synthesized model compounds, primarily of the phenol-formaldehyde family of resins. The current technical progress report presents further developments on resin synthesis and characterization and the design of a pyro-gasifier reactor for transient kinetic studies of the chars produced from the model compounds. 7 references, 12 figures, 2 tables.

  19. Water Reactor Safety Research Division. Quarterly progress report, April 1-June 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Abuaf, N.; Levine, M.M.; Saha, P.; van Rooyen, D.

    1980-08-01

    The Water Reactor Safety Research Programs quarterly report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: LWR Thermal Hydraulic Development, Advanced Code Evlauation, TRAC Code Assessment, and Stress Corrosion Cracking of PWR Steam Generator Tubing.

  20. Materials compatibility and lubricants research on CFC-refrigerant substitutes. Quarterly technical progress report, 1 October 1992--31 December 1992

    Energy Technology Data Exchange (ETDEWEB)

    Hourahan, G.C.; Szymurski, S.R.

    1993-01-01

    The materials Compatibility and Lubricants Research (MCLR) program supports critical research to accelerate the introduction of CFC-refrigerant substitutes. The MCLR program addresses refrigerant and lubricant properties and materials compatibility. The primary elements of the work include data collection and dissemination, materials compatibility testing, and methods development. The work is guided by an Advisory committee consisting of technical experts from the refrigeration and air-conditioning industry and government agencies. Under the current MCLR program the Air-Conditioning and Refrigeration Technology Institute, Inc., (ARTI) is contracting and managing multiple research projects and a data collection and dissemination effort. Preliminary results from these projects are reported in technical progress reports prepared by each researcher.

  1. Design, construction, operation, and evaluation of a prototype culm-combustion boiler/heater unit. Quarterly technical progress report, October 1-December 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-02-01

    This report provides a summary of the work performed on the Prototype Culm Combustion Boiler/Heater Unit, Phase I - Engineering Design and Analysis and Phase II - Prototype Plant Construction during the period October 1, 1980 through December 31, 1980. The objectives of the program as well as the technical progress and problem areas encountered during the reporting period are presented. The final detail design effort was completed and the final design report submitted. Progress on procurement activity authorized by full Phase II release on March 20, 1980, is discussed. Following approval by DOE, a purchase order was placed with the Norflor Construction Corporation for the prototype plant construction which began in November. Construction of the access roadway installation of the electric power, sewer and water lines was completed during this reporting period. Boiler construction continued.

  2. A systematic assessment of the state of hazardous waste clean-up technologies. Quarterly technical progress report, April 1--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Berg, M.T.; Reed, B.E.; Gabr, M.

    1993-07-01

    West Virginia University (WVU) and the US DOE Morgantown Energy Technology Center (METC) entered into a Cooperative Agreement on August 29, 1992 entitled ``Decontamination Systems Information and Research Programs.`` Stipulated within the Agreement is the requirement that WVU submit to METC a series of Technical Progress Report for Year 1 of the Agreement. This report reflects the progress and/or efforts performed on the following nine technical projects encompassed by the Year 1 Agreement for the period of April 1 through June 30, 1993: Systematic assessment of the state of hazardous waste clean-up technologies; site remediation technologies -- drain-enhanced soil flushing (DESF) for organic contaminants removal; site remediation technologies -- in situ bioremediation of organic contaminants; excavation systems for hazardous waste sites; chemical destruction of polychlorinated biphenyls; development of organic sensors -- monolayer and multilayer self-assembled films for chemical sensors; Winfield lock and dam remediation; Assessments of Technologies for hazardous waste site remediation -- non-treatment technologies and pilot scale test facility implementation; and remediation of hazardous sites with stream reforming.

  3. Novel microorganism for selective separation of coal from ash and pyrite; First quarterly technical progress report, September 1, 1993--November 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Misra, M.; Smith, R.W.; Raichur, A.M.

    1993-12-31

    This report summarizes the progress made during the first quarter of the research project entitled ``A Novel Microorganism for Selective Separation of Coal from Ash and Pyrite,`` DOE Grant No. DE-FG22-93PC93215. The objective of this project is to study the effectiveness of a novel hydrophobic microorganism, Mycobacterium phlei (M. phlei), for the selective flocculation of coal from pyrite and ash-forming minerals. During the reporting period, three different coal samples: Illinois No. 6 coal, Kentucky No. 9 coal and Pittsburgh No. 8 coal, were collected to be used in the investigation. The microorganism, M. phlei, was obtained as freeze-dried cultures and the growth characteristics of the bacteria were studied. Scanning electron microphotographs revealed that M. phlei cells are coccal in shape and are approximately 1 {mu}m in diameter. Electrokinetic measurements showed that the Illinois No. 6 and Pittsburgh No. 8 coal samples had an isoelectric point (IEP) around pH 6 whereas M. phlei had an IEP around pH 1.5. Electrokinetic measurements of the ruptured microorganisms exhibited an increase in IEP. The increase in IEP of the ruputured cells was due to the release of fatty acids and polar groups from the cell membrane.

  4. Design, construction, operation and evaluation of a Prototype Culm Combustion Boiler/Heater Unit. Quarterly technical progress report, October 1-December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    1980-02-01

    This report provides a summary of the work performed on the Prototype Culm Combustion Boiler/Heater Unit, Phase I - Engineering Design and Analysis and Limited Phase II - Prototype Plant Construction during the period October 1, 1979 through December 31, 1979. The objectives of the program as well as the technical progress and problem areas encountered during the reporting period are presented. Progress on the components and system engineering studies is described. The Preliminary Design of Prototype Unit Topical Report was submitted during this reporting period. Final design activity is continuing and the progress on drawing preparation and advanced procurement activity is discussed. Based on authorization for a limited amount of Phase II activity, initial purchase orders were released authorizing preparation of certified drawings for fabricated equipment required to support the Phase I final design activity. The Purchase Order for site clearance and installation of boiler foundations was awarded during this reporting period and ground breaking ceremonies were held at the Prototype Culm Combustion Boiler site in Paxinos, Pennsylvania on December 7, 1979.

  5. Innovative Clean Coal Technology (ICCT): 180 MW demonstration of advanced tangentially-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. Technical progress report, second quarter 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-11-25

    This quarterly report discusses the technical progress of a US Department of Energy (DOE) Innovative Clean Coal Technology (ICCT) Project demonstrating advanced tangentially-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from a coal-fired boiler. The project is being conducted at Gulf Power Company`s Plant Lansing Smith Unit 2 located near Panama City, Florida. The primary objective of this demonstration is to determine the long-term effects of commercially available tangentially-fired low NO{sub x} combustion technologies on NO{sub x} emissions and boiler performance. A target of achieving fifty percent NO{sub x} reduction using combustion modifications has been established for the project. The stepwise approach that is being used to evaluate the NO{sub x} control technologies requires three plant outages to successively install the test instrumentation and the different levels of the low NO{sub x} concentric firing system (LNCFS). Following each outage, a series of four groups of tests are performed. These are (1) diagnostic, (2) performance, (3) long-term, and (4) verification. These tests are used to quantify the NO{sub x} reductions of each technology and evaluate the effects of those reductions on other combustion parameters such as particulate characteristics and boiler efficiency. This technical progress report presents the LNCFS Level I short-term data collected during this quarter. In addition, a comparison of all the long-term emissions data that have been collected to date is included.

  6. Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly technical progress report 9, October 1, 1994--December 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Moro, N.; Shields, G.L.; Smit, F.J.; Jha, M.C. [AMAX Research and Development Center, Golden, CO (United States)

    1995-01-25

    The primary goal of this project is the engineering development of two advanced physical fine coal cleaning processes, column flotation and selective agglomeration, for premium fuel applications. The project scope includes laboratory research and bench-scale testing on six coals to optimize these processes, followed by design, and construction of a 2-t/hr process development unit (PDU). The PDU will then be operated to generate 200 ton lots of each of three project coals, by each process. The project began in October, 1992 and is scheduled for completion by March, 1997. During Quarter 9 (October--December, 1995), parametric and optimization testing was completed for the Taggart, Sunnyside, and Indiana VII coal using a 12-inch Microcel{trademark} flotation column. The detailed design of the 2-t/hr PDU grinding, flotation, and dewatering circuits neared completion with the specification of the major pieces of capital equipment to be purchased for these areas. Selective agglomeration test work investigated the properties of various industrial grades of heptane for use during bench- and PDU-scale testing. It was decided to use a hydrotreated grade of commercial heptane due to its low cost and low concentration of aromatic compounds. The final Subtask 6.4 CWF Formulation Studies Test Plan was issued. A draft version of the Subtask 6.5 Preliminary Design and Test Plan Report was also issued, discussing the progress made in the design of the bench-scale selective agglomeration unit. PDU construction work moved forward through the issuing of 26 request for quotations and 21 award packages for capital equipment.

  7. Innovative Clean Coal Technology (ICCT): 500 MW demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. Third quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly report discusses the technical progress of an Innovative Clean Coal Technology (ICCT) demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. The project provides a stepwise retrofit of an advanced overfire air (AOFA) system followed by low NO{sub x} burners (LNB). During each test phase of the project, diagnostic, performance, long-term, and verification testing will be performed. These tests are used to quantify the NO{sub x} reductions of each technology and evaluate the effects of those reductions on other combustion parameters such as particulate characteristics and boiler efficiency. Baseline, AOFA, LNB, and LNB plus AOFA test segments have been completed. Analysis of the 94 days of LNB long-term data collected show the full-load NO{sub x} emission levels to be approximately 0.65 lb/MBtu with fly ash LOI values of approximately 8 percent. Corresponding values for the AOFA configuration are 0.94 lb/MBtu and approximately 10 percent. For comparison, the long-term full-load, baseline NO{sub x} emission level was approximately 1.24 lb/MBtu at 5.2 percent LOI. Comprehensive testing in the LNB+AOFA configuration indicate that at full-load, NO{sub x} emissions and fly ash LOI are near 0.40 lb/MBtu and 8 percent, respectively. However, it is believed that a substantial portion of the incremental change in NO{sub x} emissions between the LNB and LNB+AOFA configurations is the result of additional burner tuning and other operational adjustments and is not the result of the AOFA system. During this quarter, LNB+AOFA testing was concluded. Testing performed during this quarter included long-term and verification testing in the LNB+AOFA configuration.

  8. Computational Modeling and Experimental Studies on NO(x) Reduction Under Pulveerized Coal Combustion Conditions. Quarterly technical progress report, July 1 - September 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Kumpaty, S.K.; Subramanian, K.; Darboe, A.; Kumpati, S.K.

    1997-12-31

    Several experiments were conducted during this quarter to study the NO{sub x} reduction effectiveness of lignite coal, activated carbon and catalytic sites such as calcium sulfide and calcium carbide. While some of the coals/chemicals could be fed easily, some needed the mixing with silica gel to result in a uniform flow through the feeder. Several trial runs were performed to ensure proper feeding of the material before conducting the actual experiment to record NO{sub x} reduction. The experimental approach has been the same as presented in the past two quarterly reports with the coal reburning experiments. Partial reduction is achieved through methane addition for SR2=0.95 conditions and then coal or the catalyst is introduced to see if there is further reduction. Presented below are the results of the experiments conducted during this quarter.

  9. Engineering development of advanced physical fine coal cleaning technologies: Froth flotation. Quarterly technical progress report No. 17, August 1, 1992--December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    The construction of the DOE POC at the OCDO facility continued through this entire quarter. By the end of the quarter approximately 90% of all of the construction had been completed. All equipment has beeninstalled, checked for mechanical and installation and operated from a local pushbutton. During this quarter a review of items to be completed for start-up was compiled. This information was then presented to the construction subcontractors and agreement was concluded that all items will be completed and operational for processing coal by February 1, 1993. There are still several items that were not on site for installation during this quarter. These items are the flocculant controls supplied by Westec Engineering, Inc., and the discharge valve for the hyperbaric filter supplied by KHD. Neither of these items will prevent start-up. The flocculants can be manually controlled and provisions are all ready provided to bypass the hyperbaric filter to the Sharpels high-G centrifuge. Both of these items are scheduled for delivery in mid-January.

  10. Applications of advanced petroleum production technology and water alternating gas injection for enhanced oil recovery -- Mattoon Oil Field, Illinois. First quarterly technical progress report, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Baroni, M.R.

    1993-05-24

    For work during the first quarter of 1993, American Oil Recovery, Inc. targeted completion of the following specific objectives: Convene meetings of Mattoon Project subcontractors in order to plan and coordinate Project activities. Confirm organizational arrangements and plans for implementation of Mattoon Project. Complete most work on detailed analysis of reservoir geology of productive leases in the Mattoon Project. Identify first Facies Defined Subunit for initial injectivity testing to be commenced near the beginning of the second quarter. Identify additional Facies Defined Subunits for injectivity testing and characterization during the second and third quarters. Award subcontract to the Illinois State Geological Survey and commence work on preparation of a geostatistical model (STRATAMODEL) of more than 100 wells on 1,000 acres within the Mattoon Project Area. Obtain oil samples from wells in the identified Facies Subunit for reservoir rock, fluid, and CO{sub 2} compatibility testing by the Illinois State Geological Survey. Design CO{sub 2} injection pumps and injection monitoring equipment configuration. Obtain bids for required pumps and diesel motor. Accomplishments for this quarter are reported.

  11. Aircraft Nuclear Propulsion Project Quarterly Progress Report for Period Ending December 31, 1956

    Energy Technology Data Exchange (ETDEWEB)

    NA, NA [ORNL

    1957-03-12

    This quarterly progress report of the Aircraft Nuclear Propulsion Project at ORNL records the technical progress of research on circulating-fuel reactors and other ANP research at the Laboratory. The report is divided into five major parts: 1) Aircraft Reactor Engineering, 2) Chemistry, and 3) Metallurgy, 4) Heat Transfer and Physical Properties, Radiation Damage, and Fuel Recovery and Reprocessing, and 5) Reactor Shielding.

  12. The economical production of alcohol fuels from coal-derived synthesis gas. Quarterly technical progress report No. 5, October 1, 1992--December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    Two base case flow sheets have now been prepared. In the first, which was originally presented in TPR4, a Texaco gasifier is used. Natural gas is also burned in sufficient quantity to increase the hydrogen to carbon monoxide ratio of the synthesis gas to the required value of 1. 1 for alcohol synthesis. Acid gas clean up and sulfur removal are accomplished using the Rectisol process followed by the Claus and Beavon processes. About 10% of the synthesis gas is sent to a power generation unit in order to produce electric power, with the remaining 90% used for alcohol synthesis. For this process, the estimated installed cost is $474.2 mm. The estimated annual operating costs are $64.5 MM. At a price of alcohol fuels in the vicinity of $1. 00/gal, the pay back period for construction of this plant is about four years. The details of this case, called Base Case 1, are presented in Appendix 1. The second base case, called Base Case 2, also has a detailed description and explanation in Appendix 1. In Base Case 2, a Lurgi Gasifier is used. The motivation for using a Lurgi Gasifier is that it runs at a lower temperature and pressure and, therefore, produces by-products such as coal liquids which can be sold. Based upon the economics of joint production, discussed in Technical Progress Report 4, this is a necessity. Since synthesis gas from natural gas is always less expensive to produce than from coal, then alcohol fuels will always be less expensive to produce from natural gas than from coal. Therefore, the only way to make coal- derived alcohol fuels economically competitive is to decrease the cost of production of coal-derived synthesis gas. one method for accomplishing this is to sell the by-products from the gasification step. The details of this strategy are discussed in Appendix 3.

  13. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  14. Yucca Mountain Site Characterization Project technical data catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with t requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to@ previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  15. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  16. Low cost hydrogen/novel membrane technology for hydrogen separation from synthesis gas, Phase 1. Quarterly technical progress report for the period ending March 31, 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-12-31

    The goal of this program is to develop polymer membranes useful in the preparation of hydrogen from coal-derived synthesis gas. During this quarter the first experiment were aimed at developing high performance composite membranes for the separation of hydrogen from nitrogen and carbon monoxide. Three polymers have been selected as materials for these membranes: polyetherimide cellulose acetate and ethylcellulose. This quarter the investigators worked on polyetherimide and cellulose acetate membranes. The overall structure of these membranes is shown schematically in Figure 1. As shown, a microporous support membrane is first coated with a high flux intermediate layer then with an ultrathin permselective layer and finally, if necessary, a thin protective high flux layer. 1 fig., 4 tabs.

  17. Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly technical progress report 12, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Moro, N.; Shields, G.L.; Smit, F.J.; Jha, M.C.

    1995-10-31

    The primary goal of this project is the engineering development of two advanced physical fine coal cleaning processes, column flotation and selective agglomeration, for premium fuel applications. The project scope includes laboratory research and bench-scale testing on six coals to optimize these processes, followed by design, and construction and operation of a 2-t/hr process development unit. The project began in October, 1992, and is scheduled for completion by June, 1997. During Quarter 12 (July--September 1995), work continued on the Subtask 3.2 in-plant testing of the Microcel{trademark} flotation column at Lady Dunn. Under Subtask 4.4, additional toxic trace element analysis of column flotation samples finalized the data set. Data analysis indicates that reasonably good mass balances were achieved for most elements. The final Subtask 6.3 Selective Agglomeration Process Optimization topical report was issued this quarter. Preliminary Subtask 6.4 work investigating coal-water-fuel slurry formulation indicated that selective agglomeration products formulate slurries with lower viscosities than advanced flotation products. Work continued on Subtask 6.5 agglomeration bench-scale testing. Results indicate that a 2 lb ash/MBtu product could be produced at a 100-mesh topsize with the Elkhorn No. 3 coal. The detailed design of the 2 t/hr selective agglomeration module neared completion this quarter with the completion of additional revisions of both the process flow, and the process piping and instrument diagrams. Construction of the 2 t/hr PDU and advanced flotation module was completed this quarter and startup and shakedown testing began.

  18. Pelletizing/reslurrying as a means of distributing and firing clean coal. Final quarterly technical progress report No. 7, January 1, 1992-- March 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Conkle, H.N.

    1992-06-09

    Work in this quarter focused on completing (1) the final batch of pilot-scale disk pellets, (2) storage, handling, and transportation evaluation, (3) pellet reslurrying and atomization studies, and (4) cost estimation for pellet and slurry production. Disk pelletization of Elkhorn coal was completed this quarter. Pellets were approximately 1/2- to 3/4-in. in diameter. Pellets, after thermal curing were strong and durable and exceeded the pellet acceptance criteria. Storage and handling tests indicate a strong, durable pellet can be prepared from all coals, and these pellets (with the appropriate binder) can withstand outdoor, exposed storage for at least 4 weeks. Pellets in unexposed storage show no deterioration in pellet properties. Real and simulated transportation tests indicate truck transportation should generate less than 5 percent fines during transport. Continuous reslurrying testing and subsequent atomization evaluation were performed this quarter in association with University of Alabama and Jim Walter Resources. Four different slurries of approximately 55-percent-solids with viscosities below 500 cP (at 100 sec{sup {minus}1}) were prepared. Both continuous pellet-to-slurry production and atomization testing was successfully demonstrated. Finally, an in depth evaluation of the cost to prepare pellets, transport, handle, store, and convert the pellet into Coal Water Fuel (CWF) slurries was completed. Cost of the pellet-CWF option are compared with the cost to directly convert clean coal filter cake into slurry and transport, handle and store it at the user site. Findings indicate that in many circumstances, the pellet-CWF option would be the preferred choice. The decision depends on the plant size and transportation distance, and to a lesser degree on the pelletization technique and the coal selected.

  19. Identification and validation of heavy metal and radionuclide accumulating terrestrial plant species. Quarterly technical progress report, June 21, 1995--September 20, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Kochian, L.

    1995-12-31

    This quarterly report describes experiments on uptake of a variety of heavy metals by plants. Titles of report sections are (1) Alleviation of heavy-metal induced micronutrient deficiency through foliar fertilization, (2) Second screen for Zn, Cu, and Cd accumulation, (3) Characterization of the root Zn hyperaccumulation by Thlaspi caerulescens, (4) Comparison of commercial Brassica accessions obtained from the Iowa seed bank, (5) Second screening experiment for the accumulation of Cs and Sr by plants, (6) Effect of Ca on Cs and Sr accumulation by selected dicot species, and (7) Preliminary investigations into the forms of uranium taken up by plants.

  20. Development of molten carbonate fuel cell power plant technology. Quarterly technical progress report No. 5, October 1, 1980-December 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The overall objective of this program is to develop and verify the design of a prototype molten carbonate fuel cell stack which meets the requirements of a 1990's-competitive coal-fired electrical utility central station or industrial cogeneratin power plants. During this quarter, activity continued in all four task areas: Task 1 - system studies to define the reference power plant design; Task 2 - cell and stack design, development and verification; Task 3 - preparation for fabrication and testing of the full-scale prototype stack; and Task 4 - development of the capability to operate stacks on coal-derived gas.

  1. Improvement of storage, handling, and transportability of fine coal. Quarterly technical progress report No. 4, October 1, 1994--December 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-20

    The objectives of this project are to demonstrate that: The Mulled Coal process, which has been proven to work on a wide range of wet fine coals at bench scale, will work equally well on a continuous basis, producing consistent quality at a convincing rate of production in a commercial coal preparation plant. The wet product from a fine coal cleaning circuit can be converted to a solid fuel form for ease of handling and cost savings in storage and rail car transportation. A wet fine coal product thus converted to a solid fuel form, can be stored, shipped, and burned with conventional fuel handling, transportation, and combustion systems. During this fourth quarter of the contract period, activities were underway under Tasks 2 and 3. Sufficient characterization of the bench-scale testing and pilot-plant testing results enabled the design and procurement activities to move forward. On that basis, activities in the areas of design and procurement that had been initiated during the previous quarter were conducted and completed.

  2. Hazardous materials in aquatic environments of the Mississippi River Basin Project management. Technical quarterly progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    McLachlan, J.; Ide, C.F.; O`Connor, S.

    1996-08-01

    This quarterly report summarizes accomplishments for the Project examining hazardous materials in aquatic environments of the Mississippi River Basin. Among the many research areas summarized are the following: assessment of mechanisms of metal-induced reproductive toxicity in aquatic species as a biomarker of exposure; hazardous wastes in aquatic environment;ecological sentinels of aquatic contamination in the lower Mississippi River System; remediation of selected contaminants; rapid on-site immunassay for heavy metal contamination; molecular mechanisms of developmental toxicity induced by retinoids and retinoid-like molecules; resuseable synthetic membranes for the removal of aromatic and halogenated organic pollutants from waste water; Effects of steroid receptor activation in neurendocrine cell of the mammalian hypothalamus; modeling and assessment of environmental quality of louisiana bayous and swamps; enhancement of environmental education. The report also contains a summary of publications resulting from this project and an appendix with analytical core protocals and target compounds and metals.

  3. Materials compatibility and lubricants research on CFC-refrigerant substitutes. Quarterly MCLR program technical progress report, January 1, 1995--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Szymurski, S.R.; Hourahan, G.C.; Godwin, D.S.

    1995-04-01

    The Materials Compatibility and Lubricants Research (MCLR) program supports critical research to accelerate the introduction of CFC and HCFC refrigerant substitutes. The MCLR program addresses refrigerant and lubricant properties and materials compatibility. The primary elements of the work include data collection and dissemination, materials compatibility testing, and methods development. The work is guided by an Advisory Committee consisting of technical experts from the refrigeration and air-conditioning industry and government agencies. The Air-Conditioning and Refrigeration Technology Institute, Inc., (ARTI) manages and contracts multiple research projects and a data collection and dissemination effort. Detailed results from these projects are reported in technical reports prepared by each subcontractor.

  4. Engineering development of advanced physical fine coal cleaning for premium fuel applications. Quarterly technical progress report 14, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Moro, N.; Shields, G.L.; Smit, F.J.; Jha, M.C.

    1996-04-30

    The primary goal of this project is the engineering development of two advanced physical fine coal cleaning processes, column flotation and selective agglomeration, for premium fuel applications. The project scope includes laboratory research and bench-scale testing on six coals to optimize these processes, followed by the design, construction, and operation of a 2-t/hr process development unit (PDU). The project began in October, 1992, and is scheduled for completion by June 1997. During Quarter 14 (January--March 1996), parametric testing of the 30-inch Microcel{trademark} flotation column at the Lady Dunn Plant continued under Subtask 3.2. Subtask 3. 3 testing, investigating a novel Hydrophobic Dewatering process (HD), continued this quarter with parametric testing of the batch dewatering unit. Coal product moistures of 3 to 12 percent were achieved, with higher percent solids slurry feeds resulting in lower product moistures. For a given percent solids feed, the product moisture decreased with increasing butane to dry coal ratios. Stirring time, stirring rate, and settling time were all found to have little effect on the final moisture content. Continuing Subtask 6.4 work, investigating coal-water-fuel slurry formulation for coals cleaned by selective agglomeration, indicated that pH adjustment to 10 resulted in marginally better (lower viscosity) slurries for one of the two coals tested. Subtask 6.5 agglomeration bench-scale testing results indicate that the new Taggart coal requires a grind with a d{sub 80} of approximately 33 microns to achieve the 1 lb ash/MBtu product quality specification. Also under Subtask 6.5, reductions in the various trace element concentrations accomplished during selective agglomeration were determined. Work was essentially completed on the detailed design of the PDU selective agglomeration module under Task 7 with the issuing of a draft report.

  5. The economical production of alcohol fuels from coal-derived synthesis gas. Quarterly technical progress report number 12, July 1--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    Both plug-flow microreactor systems at WVU are now functioning. Screening runs on these systems were started using carbide and nitride catalysts first, to avoid any question of contamination of the system with sulfur. The carbide and nitride catalysts are characterized by high activity but low selectivity towards alcohols. The Chevrel-phase catalysts tested have much lower activities but may be more selective to alcohols. Catalyst synthesis procedures are attempting to offset this tendency, and also to characterize and prepare sulfide catalyst by other approaches. At UCC and P, test runs on the reactor system have commenced. Higher alcohols up to butanol were observed and identified at high temperatures. Modeling studies have concentrated on the catalytic membrane reactor. The topical report, originally submitted last quarter, was revised after some errors were found. This report includes the design and economics for the seven cases discussed in previous quarterly reports. In the topical report, it is shown that a judicious choice of coal:natural gas feed ratio to the alcohol synthesis process allows the Shell Gasifier to be nearly competitive with natural gas priced at of $3.00/MMBtu. The advantage of the Shell Gasifier over the Texaco Gasifier is that the former produces a syngas with a lower H{sub 2}:CO ratio. When the feed to the process is coal only, there is no difference in the projected economics that would favor one gasifier over the other. The potential of co-generation of electric power with high alcohol fuel additives has been investigated. Preliminary results have revealed that a once-through alcohol synthesis process with minimal gas clean-up may provide an attractive alternative to current designs given the prevailing economic status of IGCC units.

  6. Federal Assistance Program Quarterly Project Progress Report. Geothermal Energy Program: Information Dissemination, Public Outreach, and Technical Analysis Activities. Reporting Period: January 1 - March 31, 2001 [Final report

    Energy Technology Data Exchange (ETDEWEB)

    Lund, John W.

    2002-03-22

    The final report of the accomplishments of the geothermal energy program: information dissemination, public outreach and technical analysis activities by the project team consisting of the Geo-Heat Center, Geothermal Resources Council, Geothermal Education Office, Geothermal Energy Association and the Washington State University Energy Program.

  7. Innovative Clean Coal Technology (ICCT): 500 MW demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. Technical progress report, First quarter 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    This quarterly report discusses the technical progress of an Innovative Clean Coal Technology (ICCT) demonstration of advanced wall-fired combustion techniques for the reduction of nitrogen oxide (NO{sub x}) emissions from coal-fired boilers. The project is being conducted at Georgia Power Company`s Plant Hammond Unit 4 located near Rome, Georgia. The primary goal of this project is the characterization of the low NO{sub x} combustion equipment through the collection and analysis of long-term emissions data. A target of achieving fifty percent NO{sub x} reduction using combustion modifications has been established for the project. The project provides a stepwise retrofit of an advanced overfire air (AOFA) system followed by low NO{sub x} burners (LNB). During each test phase of the project, diagnostic, performance, long-term, and verification testing will be performed. These tests are used to quantify the NO{sub x} reductions of each technology and evaluate the effects of those reductions on other combustion parameters such as particulate characteristics and boiler efficiency.

  8. Preliminary study of the behavioral and biological effects of high intensity 60 Hz electric fields. Quarterly technical progress report, No. 1. [Development and testing of experimental protocols and apparatus

    Energy Technology Data Exchange (ETDEWEB)

    1978-08-01

    The major objective of this preliminary study is to develop and thoroughly test the experimental protocols and apparatus, which are planned for a major study of the behavioral and biological effects of high intensity 60 Hz electric fields. The behavior of baboons will be observed before, during, and after exposure to 60 Hz electric fields at a maximum intensity of 60 kV/m. Both individual performance (operant conditioning) and social behavior will be examined. The preliminary study will differ from the planned major study as follows: subjects will be used as their own controls; a smaller number of subjects will be run; field intensity will not be varied; the electric field should be non-uniform; the preliminary study exposure facility will be basically an outdoor facility; to avoid deterioration of plastic materials, the high intensity fields will not be turned on during or just after rainfall; and in the preliminary study the biological work will be restricted to the clinical determination of the health of subjects before and after exposure. The present report is the first of three quarterly technical progress reports. It covers approximately the first two and one-half months of activity and, therefore, consists primarily of plans. The report addresses four major areas: the high intensity field exposure facility; the field measurement instrumentation; the operation conditioning equipment; and experimental methods including experimental design and data analysis.

  9. Development of automated welding process for field fabrication of thick walled pressure vessels. Fourth quarter technical progress report for period ending September 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Progress in developing an automated welding process for the field fabrication of thick walled pressure vessels is reported. Plans for the demonstration facility, for nondestructive testing, and for the procurement of materials are discussed. (LCL)

  10. Materials Compatibility and Lubricants Research of CFC-refrigerant substitutes. Quarterly technical progress report, 1 April 1993--30 June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Godwin, D.S.; Hourahan, G.C.; Szymurski, S.R.

    1993-07-01

    The Materials Compatibility and Lubricants Research (MCLR) program supports critical research to accelerate the introduction of CFC and HCFC refrigerant substitutes. The DCLR program addresses refrigerant and lubricant properties and materials compatibility. The primary elements of the work include data collection and dissemination, materials compatibility testing, and methods development. The work is guided by an Advisory Committee consisting of technical experts from the refrigeration and air-conditioning industry and government agencies. Under the current MCLR program the Air-Conditioning and Refrigeration Technology Institute, Inc., (ARTI) is contracting and managing multiple research projects and a data collection and dissemination effort. Detailed results from these projects are reported in technical reports prepared by each researcher.

  11. Oil shale, tar sand, coal research, advanced exploratory process technology, jointly sponsored research. Quarterly technical progress report, January--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    Accomplishments for the past quarter are briefly described for the following areas of research: oil shale; tar sand; coal; advanced exploratory process technology; and jointly sponsored research. Oil shale and tar sand researches cover processing studies. Coal research includes: coal combustion; integrated coal processing concepts; and solid waste management. Advanced exploratory process technology covers: advanced process concepts; advanced mitigation concepts; and oil and gas technology. Jointly sponsored research includes: organic and inorganic hazardous waste stabilization; CROW{sup TM} field demonstration with Bell Lumber and Pole; development and validation of a standard test method for sequential batch extraction fluid; operation and evaluation of the CO{sub 2} HUFF-N-PUFF Process; fly ash binder for unsurfaced road aggregates; solid-state NMR analysis of Mesaverde Group, Greater Green River Basin tight gas sands; characterization of petroleum residue; shallow oil production using horizontal wells with enhanced oil recovery techniques; surface process study for oil recovery using a thermal extraction process; oil field waste cleanup using tank bottom recovery process; remote chemical sensor development; in situ treatment of manufactured gas plant contaminated soils demonstration program; solid-state NMR analysis of naturally and artificially matured kerogens; and development of an effective method for the clean-up of natural gas.

  12. Oil shale, tar sand, coal research advanced exploratory process technology, jointly sponsored research. Quarterly technical progress report, October--December 1992

    Energy Technology Data Exchange (ETDEWEB)

    Speight, J.G.

    1992-12-31

    Accomplishments for the past quarter are presented for the following five tasks: oil shale; tar sand; coal; advanced exploratory process technology; and jointly sponsored research. Oil shale research covers oil shale process studies. Tar sand research is on process development of Recycle Oil Pyrolysis and Extraction (ROPE) Process. Coal research covers: coal combustion; integrated coal processing concepts; and solid waste management. Advanced exploratory process technology includes: advanced process concepts;advanced mitigation concepts; and oil and gas technology. Jointly sponsored research includes: organic and inorganic hazardous waste stabilization; CROW field demonstration with Bell Lumber and Pole; development and validation of a standard test method for sequential batch extraction fluid; PGI demonstration project; operation and evaluation of the CO{sub 2} HUFF-N-PUFF Process; fly ash binder for unsurfaced road aggregates; solid state NMR analysis of Mesaverde Group, Greater Green River Basin, tight gas sands; flow-loop testing of double-wall pipe for thermal applications; characterization of petroleum residue; shallow oil production using horizontal wells with enhanced oil recovery techniques; surface process study for oil recovery using a thermal extraction process; NMR analysis of samples from the ocean drilling program; in situ treatment of manufactured gas plant contaminated soils demonstration program; and solid state NMR analysis of naturally and artificially matured kerogens.

  13. Characterization and analysis of Devonian shales as related to release of gaseous hydrocarbons. Quarterly technical progress report, October--December 1978

    Energy Technology Data Exchange (ETDEWEB)

    Kalyoncu, R.S.; Snyder, M.J.

    1979-01-15

    The characterization data obtained during the period October through December 1978 are described. One well in Allegany County, New York, was sampled in September 1978. A total of 412 samples were collected from the Allegany County, New York well (165 for Battelle and 247 for other DOE/MERC contractors). Two other wells, namely in Wetzel County, West Virginia and Johnson County, Kentucky, were cored during the last quarter of 1978. A total of 109 samples were obtained from the Wetzel County, West Virginia well (46 samples for Battelle and 63 samples for other DOE/MERC contractors). The samples were obtained from depths of 6100 to 6635 feet. Characterization data on I-2 (EGSP Ind. No. 2), Clark County, Indiana, and Y-1 (EGSP New York No. 1), Allegany County, New York wells are reported and discussed. Analysis of the hydrocarbon gases in Y-1 samples indicates that the longer chain hydrocarbon gases (ethane, propane, butane) in these shales are significantly higher than in the previous wells studied. The Indiana well (I-2) shows surprisingly high carbon contents compared with the hydrocarbon gas contents. The carbon contents of the Y-1 (Allegany County, New York) well, on the other hand, are somewhat lower than would be predicted from the hydrocarbon gas contents. Among the physical properties, the I-2 well generally exhibits lower density values than previously studied shales.

  14. Low cost hydrogen/novel membrane technology for hydrogen separation from synthesis gas, Phase 1. Quarterly technical progress report for the period ending December 31, 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-12-31

    During the last quarter several high performance membranes for the separation of hydrogen from nitrogen, carbon monoxide, hydrogen sulfide and carbon dioxide. The heat-resistant resin poly(etherimide) has been selected as the polymer with the most outstanding properties for the separation of hydrogen from nitrogen and carbon monoxide. Flat sheet and hollow fiber poly(etherimide) membranes have been prepared and evaluated with pure gases and gas mixtures at elevated pressures and temperatures. Multilayer composite poly(ether-ester-amide) membranes were also developed. These membranes are useful for the separation of carbon dioxide and hydrogen sulfide hydrogen. They have very high selectivities and extremely high normalized carbon dioxide and hydrogen sulfide fluxes. Separation of carbon dioxide/hydrogen streams is a key problem in hydrogen production from coal. The development of the two membranes now gives us two approaches to separate these gas streams, depending on the stream`s composition. If the stream contains small quantities of hydrogen, the hydrogen- permeable poly(etherimide) membrane would be used to produce a hydrogen-enriched permeate. If the stream contains small quantities of carbon dioxide or hydrogen sulfide, the poly(ether-ester-amide) membrane would be used to produce a carbon dioxide/hydrogen sulfide-free, hydrogen-enriched residue stream. 6 fig., 4 tabs.

  15. Low cost hydrogen/novel membranes technology for hydrogen separation from synthesis gas, Phase 1. Quarterly technical progress report for the period ending June 30, 1987

    Energy Technology Data Exchange (ETDEWEB)

    1987-12-31

    During this quarter, work continued on the development of high-flux palladium-silver membranes for the separation of hydrogen from carbon dioxide. Palladium-silver/poly(etherimide) composite membranes were prepared by a vacuum sputtering technique. The influence of different poly(etherimide) support membranes on the performance of palladium-silver membranes was investigated. All membranes tested showed a hydrogen/carbon dioxide selectivity lower than that of the uncoated poly(etherimide)/poly(dimethylsiloxane) membranes. This is probably due to damage of the skin layer of the asymmetric poly(etherimide) support membranes during the palladium-silver electron bombardment. Polysulfone/poly(dimethylsiloxane) / poly(ether-ester-amide) composite membranes were also prepared. Membrane samples consistently showed a carbon dioxide/hydrogen selectivity of 9 to 10 and a normalized carbon dioxide flux of 2 to 4 {times} 10{sup {minus}4} cm{sup 3} (STP)/cm{sup 2}{center_dot}sec{center_dot}cmHg. These are extremely good values, superior to any commercially available membranes for this separation. 2 figs., 4 tabs.

  16. Post waterflood CO{sub 2} miscible flood in light oil fluvial dominated deltaic reservoirs. Second quarterly technical progress report, [January 1, 1995--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    Production from the Marg Area 1 at Port Neches is averaging 392 barrels of oil per day (BOPD) for this quarter. The production drop is due to fluctuation in both GOR and BS&W on various producing well, coupled with low water injectivity in the reservoir. We were unable to inject any tangible amount of water in the reservoir since late January. Both production and injection problems are currently being evaluated to improve reservoir performance. Well Kuhn (No. 6) was stimulated with 120 MMCF of CO{sub 2}, and was placed on production in February 1, 1995. The well was shut in for an additional month after producing dry CO{sub 2} initially. The well was opened again in early April and is currently producing about 40 BOPD. CO{sub 2} injection averaged 11.3 MMCFD including 4100 MMCFD purchased from Cardox, while water injection averaged 1000 BWPD with most of the injection occurring in the month of January.

  17. Rheology of coal-water slurries prepared by the HP roll mill grinding of coal. Quarterly technical progress report number 11, March 1--May 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Fuerstenau, D.W.

    1995-06-01

    The objective of this research is the development of improved technology for the preparation of coal-water slurries that have potential for replacing fuel oil in direct combustion. Detailed investigations of the effect of solids content and chemical additives on the rheology of coal-water slurries, prepared with fines produced by the ball milling of Pittsburgh No. 8 coal, were conducted during the first phase of the research program. These experiments were to provide a baseline against which the rheological behavior of slurries prepared with fines produced by high-pressure roll milling or hybrid high-pressure, roll mill/ball mill grinding could be compared. The viscosity of slurries with high solids content is strongly influenced by the packing density of the feed material. The packing density can be significantly altered by mixing distributions of different median sizes, and to an extent by modifying the grinding environment. The research during this quarter was, therefore, directed towards: (1) establishing the relationship between the packing characteristic of fines and the viscosity of slurries prepared with the fines; (2) investigation of the effect of mixing distribution on the rheology; and (3) study of the effect of grinding environment in the ball mill on the rheology of coal-water slurries.

  18. Separation of flue-gas scrubber sludge into marketable products. Quarterly technical progress report No. 12, June 1, 1996--August 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Kawatra, S.K.; Eisele, T.C.

    1996-09-01

    To reduce their sulfur emissions, many coal-fired electric power plants use wet flue-gas scrubbers. These scrubbers convert sulfur oxides into solid sulfate and sulfite sludge, which must then be disposed of. This sludge is a result of reacting limestone with sulfur dioxide to precipitate calcium sulfite and calcium sulfate. It consists of calcium sulfite, gypsum, and unreacted limestone or lime, with miscellaneous objectionable impurities such as iron oxides, silicates, and magnesium, sodium, and potassium oxides or salts. These impurities prevent many sludges from being utilized as a replacement for natural gypsum, and as a result they must be disposed of in landfills, which presents a serious disposal problem. Knowledge of scrubber sludge characteristics is necessary for the development of purification technologies which will make it possible to directly utilize scrubber sludges rather then landfilling them. This project is studying the use of minimal-reagent froth flotation as the purification process, using the surface properties of the particles of unreacted limestone to remove them and their associated impurities from the material, leaving a purified calcium sulfite/gypsum product. In this quarter, the installation of a laboratory-scale flotation column was completed. In addition to the installation of the flotation column, research on the determination of the surface properties of the components of the scrubber sludge was continued. Auger electron spectroscopy was investigated as a method for determining the composition of the first few monolayers of unreacted limestone and calcium sulfite/sulfate particles.

  19. Development of automated welding process for field fabrication of thick walled pressure vessels. Fourth quarter technical progress report for period ending September 28, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress is reported in research aimed at optimizing an automated welding process for the field fabrication of thick-walled pressure vessels and for evaluating the welded joints. Information is included on the welding equipment, mechanical control of the process, joint design, filler wire optimization, in-process nondestructive testing of welds, and repair techniques. (LCL)

  20. Synthesis of 6-Methyl-9-n-propyldibenzothiophene-4-ol. Quarterly technical progress report No. 4, April 25--July 25, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Eisenbraun, E.J.

    1991-07-25

    The material covered in this report is divided into two parts: further cyclization experiments on 1,4-diethyl-2-[(2`- methoxyphenyl)thio]benzene and its sulfone both by chemical and photochemical means, and progress toward synthesis of modified target molecule, 9-isopropyl-4-methoxy-6-methyldibenzo-thiophene. 8 refs, figs.

  1. Development of a video-based slurry sensor for on-line ash analysis. Eighth quarterly technical progress report, July 1, 1996--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Adel, G.T.; Luttrell, G.H.

    1996-10-22

    Automatic control of fine coal cleaning circuits has traditionally been limited by the lack of sensors for on-line ash analysis. Although several nuclear-based analyzers are available, none have seen widespread acceptance. This is largely due to the fact that nuclear sensors are expensive and tend to be influenced by changes in seam type and pyrite content. Recently, researchers at VPI&SU have developed an optical sensor for phosphate analysis. The sensor uses image processing technology to analyze video images of phosphate ore. It is currently being used by PCS Phosphate for off-fine analysis of dry flotation concentrate. The primary advantages of optical sensors over nuclear sensors are that they are significantly cheaper, are not subject to measurement variations due to changes in high atomic number minerals, are inherently safer and require no special radiation permitting. The purpose of this work is to apply the knowledge gained in the development of an optical phosphate analyzer to the development of an on-fine ash analyzer for fine coal slurries. During the past quarter, installation of the video-based ash analyzer at the Middle Fork plant site was completed. A method of measuring and automatically adjusting for small variations in the sensor illumination scheme was developed and implemented. Initial on-line testing of the ash analyzer has yielded adequate calibration information, and the sensor is currently operating on-line. The on-line performance of the sensor is under review and the information from this review will be included in the final report.

  2. Development of a video-based slurry sensor for on-line ash analysis. Sixth quarterly technical progress report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Adel, G.T.; Luttrell, G.H.

    1996-04-28

    Automatic control of fine coal cleaning circuits has traditionally been limited by the lack of sensors for on-line ash analysis. Although several nuclear-based analyzers are available, none have seen widespread acceptance. This is largely due to the fact that nuclear sensors are expensive and tend to be influenced by changes in seam type and pyrite content. Recently, researchers at VPI&SU have developed an optical sensor for phosphate analysis. The sensor uses image processing technology to analyze video images of phosphate ore. It is currently being used by PCS Phosphate for off-line analysis of dry flotation concentrate. The primary advantages of optical sensors over nuclear sensors are that they are significantly cheaper, are not subject to measurement variations due to changes in high atomic number minerals, are inherently safer and require no special radiation permitting. The purpose of this work is to apply the knowledge gained in the development of an optical phosphate analyzer to the development of an on-line ash analyzer for fine coal slurries. During the past quarter, calibration tests were conducted on-site at the Middle Fork coal preparation plant owned and operated by Pittston Coal Company. After several plant visits, a consistent sensor calibration was obtained with approximately 95% of all samples analyzed falling within {plus_minus}2% ash of the best fit calibration line. The resolution of the optical analyzer was found to be approximately 0.5% ash per gray level increment. A linear neural network learning algorithm was found to be the most appropriate method for calibrating the sensor. The sensor now appears to be ready for installation and long-term testing at the Middle Fork test site.

  3. Separation of flue-gas scrubber sludge into marketable products. Third quarterly technical progress report, March 1, 1994--May 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Kawatra, S.K.; Eisele, T.C.; Shoop, K.

    1994-06-01

    Column flotation represents a significant improvement over conventional flotation for many applications. This improvement consists of increased selectivity between hydrophobic and hydrophilic particles, which allows the column to produce higher-purity products. A schematic of the column used is given in Figure 1. The basic procedure for the flotation column experiments was as follows: 500 grams of the sludge from Plant A (prepared as described in the Second Quarterly Report) was suspended at 40% solids in distilled water, to produce 1600 ml of slurry. Reagents were added, and the slurry was agitated vigorously for 1 minute. Frother was added to all of the water to be added to the column, at a rate of 0.03 grams/liter (approximately 0.4 kilograms per metric ton, Kg/mt). The frother used was Dowfroth 200 (a mixture of polypropylene glycol methyl ethers, with a mean molecular weight of 200). The column was started, all of the water flowrates were set as desired, and the drain valve was closed. As soon as the water level had reached the base of the feed inlet tube (approximately 1 minute after closing the drain valve), the 1600 ml feed slurry was added over a 15 second interval. This allowed the feed to be added to the column with a minimum of disturbance to the froth layer, and without causing either surging of the pulp level or large losses to the sinks product. Flotation was carried out for 9 minutes after closing the drain valve. Froth and sinks products were collected, filtered, dried at 45{degrees}C, weighed, and analyzed by thermogravimetic analysis. It is readily seen that, when no collector is added, the column produces a product that is markedly higher purity than that produced by conventional flotation. The addition of oleic acid collector to the column feed is not able to produce any further improvement in product quality, and only results in a loss of product recovery.

  4. A charge distribution analysis instrument for catalysis and material science applications. Third quarterly technical progress report, April 1, 1994--June 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Freund, F.

    1994-08-05

    Key component in the CDA instrument is the differential capacitive force sensor. The CDA instrument has four basic components: OEM analytical balance, flexure point and capacitor plates, gas confinement tower and high-voltage bias electrodes, and the furnace. Phyton is in position to purchase an OEM analytical balance; negotations are underway for obtaining the feedback control circuitry for the differential capacitive force sensor. Progress with the differential capacitive force sensor is reviewed.

  5. Development and testing of industrial scale, coal fired combustion system, Phase 3. Eighteenth quarterly technical progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Zauderer, B.

    1996-08-18

    In the second quarter of calendar year 1996, 16 days of combust- boiler tests were performed, including 2 days of tests on a parallel DOE sponsored project on sulfur retention in a slagging combustor. Between tests, modifications and improvements that were indicated by these tests were implemented. This brings the total number of test days to the end of June in the task 5 effort to 28, increased to 36 as of the date of this Report, 8/18/96. This compares with a total of 63 test days needed to complete the task 5 test effort. It is important to note that the only major modification to the Williamsport combustor has been the addition of a new downstream section, which lengthens the combustor and improves the combustor-boiler interface. The original combustor section, which includes the fuel, air, and cooling water delivery systems remained basically unchanged. Only the refractory liner was completely replaced, a task which occurs on an annual basis in all commercial slagging utility combustors. Therefore, this combustor has been operated since 1988 without replacement. The tests in the present reporting period are of major significance in that beginning with the first test on March 31st, for the first time slagging opening conditions were achieved in the upgraded combustor. The first results showed that the present 20 MMBtu/hr combustor design is far superior to the previous one tested since 1988 in Williamsport, PA. The most important change is that over 95% of the slag was drained from the slag tap in the combustor. This compares with an range of one-third to one-half in Williamsport. In the latter, the balance of the slag flowed out of the exit nozzle into the boiler floor. In addition, the overall system performance, including the combustor, boiler, and stack equipment, ranged from good to excellent. Those areas requiring improvement were of a nature that could be corrected with some work. but in no case were the problems encountered of a barrier type.

  6. Advanced development of fine coal desulfurization and recovery technology. Quarterly technical progress report, October 1, 1976--December 31, 1976. [53 references

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, R.W.; Wheelock, T.D.

    1977-02-01

    The improvement and technical development of promising methods for desulfurizing and recovering fine coal underway includes froth flotation, selective oil agglomeration, pelletization, and a chemical desulfurization process which involves leaching fine coal with a hot dilute solution of sodium carbonate containing dissolved oxygen under pressure. A preliminary assessment of the state of the art and review of the technical literature has been made. Equipment and apparatus have been assembled for small-scale laboratory experiments in froth flotation, oil agglomeration and chemical desulfurization. Preliminary froth flotation tests have been carried out on an Iowa coal to establish baseline data. Quite unexpectedly these tests indicated that aluminum nitrate may be an activator for coal because it served to increase the recovery of coal. Several potential flotation depressants for pyrite have been screened by measurement at the zeta potential and floatability of pyrite or coal in aqueous suspensions containing the potential depressants. The following reagents show some promise as pyrite depressants: ferric chloride, sodium cyanide, ammonium thiocyanate, and the disodium salt of ethylenediaminetetraacetic acid. Preliminary plans have been prepared for a continuous flow bench-scale system to demonstrate the process. This system will include equipment for grinding and pretreating the coal as well as equipment for demonstrating froth flotation, selective oil agglomeration and pelletization. An investigation of coal microstructure as it relates to coal beneficiation methods has also been initiated. The distribution of various forms of pyrite by size and crystal structure has been determined for two cannel samples of coal through application of scanning electron microscope techniques.

  7. Characterization of open-cycle coal-fired MHD generators. 14th/15th quarterly technical progress report, February 1-July 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Wormhoudt, J.; Yousefian, V.; Weinberg, M.; Kolb, C.; Martinez-Sanchez, M.; Cheng, W.; Bien, F.; Dvore, D.; Unkel, W.; Stewart, G.

    1980-09-01

    The successful design of full-scale, open-cycle, coal-fired MHD generators for baseload electrical production requires a detailed understanding of the plasma chemical and plasma dynamic characteristics of anticipated combustor and channel fluids. Progress in efforts to model the efficiency of an open-cycle, coal-fired MHD channel based on the characterization of the channel flow as well as laboratory experiments to validate the modeling effort as detailed. In addition, studies related to understanding arcing phenomena in the vicinity of an anode are reported.

  8. Valve development for coal gasification plants. Phase II (Draft). Quarterly technical program report, October--December 1978

    Energy Technology Data Exchange (ETDEWEB)

    Bellezza, D.

    1979-01-01

    This is the tenth in a series of Quarterly Technical Progress Reports relating to the Valve Development for Coal Gasification Plants Program. This document discusses engineering progress during the period of October to December 1978. Work performed is discussed briefly. (LTN)

  9. Environmental and economic assessment of discharges from Gulf of Mexico Region Oil and Gas Operations. Quarterly technical progress report, January 1, 1994--March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Gettleson, D.A.

    1994-04-21

    The primary objectives of the project are to increase the base of scientific knowledge concerning (1) the fate and environmental effects of organics, trace metals, and NORM in water, sediment, and biota near several offshore oil and gas facilities; (2) the characteristics of produced water and produced sand discharges as they pertain to organics, trace metals, and NORM variably found in association with the discharges; (3) the recovery of four terminated produced water discharge sites located in wetland and high-energy open bay sites of coastal Louisiana and Texas; (4) the economic and energy supply impacts of existing and anticipated federal and state offshore and coastal discharge regulations; and (5) the catch, consumption and human use patterns of seafood species collected from coastal and offshore waters. The products of the effort will be a series of technical reports detailing the study procedures, results, and conclusions which contribute to the transfer of technology to the scientific community, petroleum industry, and state and federal programs.

  10. Geothermal space/water heating for Mammoth Lakes Village, California. Quarterly technical progress report, 13 December 1976-12 March 1977

    Energy Technology Data Exchange (ETDEWEB)

    Sims, A.V.; Racine, W.C.

    1977-01-01

    During the second three months of this feasibility study to determine the technical, economic and environmental feasibility of heating Mammoth Lakes Village, California using geothermal energy, the following work was accomplished. A saturation survey of the number and types of space and water heaters currently in use in the Village was completed. Electric energy and ambient temperature metering equipment was installed. Peak heating demand for Mammoth Lakes was estimated for the years 1985, 1990 and 2000. Buildings were selected which are considered typical of Mammoth Lakes in terms of their heating systems to be used in estimating the cost of installing hydronic heating systems in Mammoth. Block diagrams and an order of magnitude cost comparison were prepared for high-temperature and low-temperature geothermal district heating systems. Models depicting a geothermal district heating system and a geothermal-electric power plant were designed, built and delivered to ERDA in Washington. Local input to the feasibility study was obtained from representatives of the State of California Departments of Transportation and Fish and Game, US Forest Service, and Mono County Planning Department.

  11. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  12. Engineering support services for the DOE/GRI coal-gasification research program. Quarterly technical progress report, October-December 1981

    Energy Technology Data Exchange (ETDEWEB)

    Bostwick, L.E.; Ethridge, T.R.; Starr, D.W.; Shah, K.V.; Hubbard, D.A.; Koneru, P.B.; Smith, M.R.; Ward, W.E.; Wong, E.W.; Zeis, L.A.

    1982-02-01

    Kellogg continued to actively monitor operations at BI-GAS Westinghouse and IGT (for peat gasification). Pilot plant/PDU testing which was monitored and reported includes Westinghouse PDU tests TP-030-3 and TP-031-3 and CFSF test TP-M003-1; Peatgas Pilot Plant test No. 4; and single-stage peat gasification PDU tests BF-22 and BF-23. Kellogg personnel briefed the GRI Project Advisors on current tasks and a DOE representative on peat-related work. The report on the Hygas Data Base Evaluation was approved for issue. Progress was made toward finalizing the report on the Peatgas Data Base Evaluation and the Descriptive Brochure for the DOE/GRI Joint Program. Work on the evaluation of the data base for single-stage peat gasification continued. Review of the Hygas final report was completed.

  13. Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, June 13--September 12, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The eighteen 10-acre infill wells which were drilled as part of the field demonstration portion of the project are all currently in service with no operational problems. These wells consist of fourteen producing wells and four injection wells. The producing wells are currently producing a total of approximately 500 bopd, down from a peak rate of 900 bopd. Unit production is currently averaging approximately 2,800 bopd, 12,000 bwpd and 17,000 bwipd. The paper describes progress on core analysis, gas-oil/oil-gas permeability tests, water-oil/oil-water permeability tests, water-gas permeability tests, electrical resistivity measurements, capillary pressure tests, reservoir surveillance, and paleontologic analysis.

  14. Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, March 13--June 12, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The eighteen 10-acre infill wells which were drilled as part of the field demonstration portion of the project are all currently in service with no operational problems. These wells consist of fourteen producing wells and four injection wells. The producing wells are currently producing a total of approximately 650 bopd, down from a peak rate of 900 bopd. Unit production is currently averaging approximately 3,000 bopd, 12,000 bwpd and 18,000 bwipd. The paper describes progress in core analysis, reservoir surveillance, well stimulation, validation of reservoir characterization (includes thin section analyses, depositional environments, and paleontologic analysis), material balance decline curve analysis, and validation of reservoir simulation (includes geostatistical and deterministic).

  15. Identification and validation of heavy metal and radionuclide hyperaccumulating terrestrial plant species, Quarterly technical progress report, December 20, 1995--March 20, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Kochian, L.; Brady, D.; Last, M.; Ebbs, S.

    1995-12-01

    Although the period covered by this progress report began on December 20, 1994, which was the date that DOE approved the Interagency Agreement, the agreement was not approved by USDA until January 9, 1995 and the first scientists working on the project were not hired until February 1, 1995. The first goal of the research supported by the Interagency Agreement is to use hydroponic techniques to identify plant species and genotypes with potential for heavy metal hyperaccumulation for planting on a test site at Silverbow Creek and for radionuclide ({sup 90}Sr and {sup 137}Cs) accumulation on a test site at INEL, Idaho, later this year. The second goal of this research is to identify soil amendment procedures that will enhance the bioavailability of heavy metals and radionuclides in the soil without increasing the movement of the contaminants of concern (COC`s) into the groundwater. Our initial research covered in this report focuses on the first goal.

  16. Process feasibility study in support of silicon material, Task I. Quarterly technical progress report (XVIII), December 1, 1979-February 29, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Yaws, C.L.; Li, K.Y.

    1980-03-01

    Analyses of process system properties were continued for important chemical materials involved in the several processes under consideration for semiconductor and solar cell grade silicon production. Major activities were devoted to physical, thermodynamic and transport property data for silicon. Property data are reported for vapor pressure heat of vaporization, heat of sublimation, liquid heat capacity and solid heat capacity as a function of temperature to permit rapid usage in engineering. Chemical engineering analysis of the HSC process (Hemlock Semiconductor Corporation) for production of silicon was initiated. The process is based on hydrogen reduction of dichlorosilane (DCS) to produce the polysilicon. The chemical vapor deposition reaction for DCS is faster in rate than the conventional process route which utilizes trichlorosilane (TCS) as the silicon raw material. Status and progress are reported for primary activities of base case conditions (30%), reaction chemistry (25%) and process flow diagram (20%). Discussions with HSC and construction of a process flow diagram are in progress. Preliminary economic analysis of the BCL process (case B) was completed. Cost analysis results are presented based on a preliminary process design of a plant to produce 1000 metric tons/year of silicon. Fixed capital investment for the plant is $14.35 million (1980 dollars) and product cost without profit is 11.08 $/kg of silicon (1980 dollars). Cost sensitivity analysis indicate that the product cost is influenced most by plant investment and least by labor. For profitability, a sales price of 14 $/kg (1980 dollars) gives a 14% DCF rate of return on investment after taxes.

  17. Development & testing of industrial scale, coal fired combustion system, phase 3. Eighth quarterly technical progress report, 1 October, 1993--31 December, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Zauderer, B.

    1994-01-31

    The primary objective of the present Phase 3 effort is to perform the final testing at a 20 MMBtu/hr commercial scale of an air cooled, slagging coal combustor for application to industrial steam boilers and power plants. The focus of the test effort will be on combustor durability, automatic control of the combustor`s operation, and optimum environmental control of emissions inside the combustor. In connection with the latter, the goal is to achieve 0.4 lb/MMBtu of SO{sub 2} emissions, 0.2 lb/MMBtu of NO{sub x} emissions, and 0.02 lb particulates/MMBtu. Meeting the particulate goal will require the use of a baghouse or electrostatic precipitator to augment the nominal slag retention in the combustor. The NO{sub x} emission goal will require a modest improvement over maximum reduction achieved to date in the combustor to a level of 0.26 lb/MMBtu. To reach the SO{sub 2} emissions goal may require a combination of sorbent injection inside the combustor and sorbent injection inside the boiler, especially in high (>3.5%) sulfur coals. Prior to the initiation of the project, SO{sub 2} levels as low as 0.6 lb/MMBtu, equal to 81% reduction in 2% sulfur coals, were measured with boiler injection of calcium hydrate. The final objective is to define suitable commercial power or steam generating systems to which the use of the air cooled combustor offers significant technical and economic benefits. In implementing this objective both simple steam generation and combined gas turbine-steam generation systems will be considered.

  18. Oil shale, tar sand, coal research, advanced exploratory process technology, jointly sponsored research. Quarterly technical progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    Progress made in five areas of research is described briefly. The subtask in oil shale research is on oil shale process studies. For tar sand the subtask reported is on process development. Coal research includes the following subtasks: Coal combustion; integrated coal processing concepts; and solid waste management. Advanced exploratory process technology includes the following: Advanced process concepts; advanced mitigation concepts; oil and gas technology. Jointly sponsored research includes: Organic and inorganic hazardous waste stabilization; CROW{sup TM} field demonstration with Bell Lumber and Pole; development and validation of a standard test method for sequential batch extraction fluid; operation and evaluation of the CO{sup 2} HUFF-N-PUFF Process; fly ash binder for unsurfaced road aggregates; solid-state NMR analysis of Mesaverde Group, Greater Green River Basin, tight gas sands; characterization of petroleum residua; shallow oil production using horizontal wells with enhanced oil recovery techniques; surface process study for oil recovery using a thermal extraction process;NMR analysis of samples from the ocean drilling program; oil field waste cleanup using tank bottom recovery process; remote chemical sensor development; in situ treatment of manufactured gas plant contaminated soils demonstration program; solid-state NMR analysis of Mowry formation shale from different sedimentary basins; solid-state NMR analysis of naturally and artificially matured kerogens; and development of effective method for the clean-up of natural gas.

  19. The economical production of alcohol fuels from coal-derived synthesis gas. Quarterly technical progress report number 13, October 1--December 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    At WVU, Mo{sub 2}S{sub 3} was produced from gas-phase reactions at 1,100 C. The gas-phase reactor was modified to increase product yields and to decrease particle size. Four Chevrel phases were synthesized for catalytic evaluation. In addition, four supported alkali-modified MoS{sub 2} materials were prepared from a single-source precursor, K{sub 2}Mo{sub 3}S{sub 13}. Screening runs have been carried out on some of these materials and others prepared earlier. At UCC and P, test runs on the reactor system have commenced. Higher alcohols up to butanol were observed and identified at high temperatures. Significant progress has been made on the Monte Carlo uncertainty analysis. Frequency distributions have been determined for all of the equipment blocks for the Texaco gasifier cases. For these cases, there is a 10% chance that the actual installed capital cost could exceed the estimated installed capital cost by $40 million dollars. This work will continue with inclusion of variable costs and prediction of the uncertainties in the return on investment. Modifications to the simulated annealing optimization program have been underway in order to increase the level of certainty that the final result is near the global optimum. Alternative design cases have been examined in efforts to enhance the economics of the production of high alcohols. One such process may be the generation of electric power using combustion turbines fueled by synthesis gas.

  20. Study of the effects of ambient conditions upon the performance of fan powered, infrared, natural gas burners. Quarterly technical progress report, July 1--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Bai, T.; Yeboah, Y.D.; Sampath, R.

    1995-10-01

    The objective of this investigation is to characterize the operation of fan powered infrared burner (PIR) at various gas compositions and ambient conditions and develop design guidelines for appliances in containing PIR burners for satisfactory performance. During this period, experimental setup with optical and electronic instrumentation that is necessary for measuring the radiant heat output and the emission gas output of the burner has been established. The radiation measurement instrument, an FTIR, has been purchased and installed in the porous burner experimental system. The radiation measurement capability of the FTIR was tested and found to be satisfactory. A standard blackbody source, made by Graseby Infrared, was employed to calibrate the FTIR. A collection duct for emission gas measurement was fabricated and connected to the existing Horiba gas analyzer. Test runs are being conducted for flue gas analysis. A number of published research papers on modeling of porous burners were reviewed. The physical mechanism and theoretical analysis of the combustion process of the PIR burner was formulated. The numerical modeling, and implementation of a PIR burner code at CAU`s computing facility is in progress.

  1. Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-10-01

    This report summarizes experimental and theoretical work in basic nuclear physics carried out between October 1, 1995, the closing of our last Progress Report, and September 30, 1996 at the Nuclear Physics Laboratory of the University of Colorado, Boulder, under contracts DE-FG03-93ER-40774 and DE-FG03-95ER-40913 with the United States Department of Energy. The experimental contract supports broadly-based experimental research in intermediate energy nuclear physics. This report includes results from studies of Elementary Systems involving the study of the structure of the nucleon via polarized high-energy positron scattering (the HERMES experiment) and lower energy pion scattering from both polarized and unpolarized nucleon targets. Results from pion- and kaon-induced reactions in a variety of nuclear systems are reported under the section heading Meson Reactions; the impact of these and other results on understanding the nucleus is presented in the Nuclear Structure section. In addition, new results from scattering of high-energy electrons (from CEBAF/TJNAF) and pions (from KEK) from a broad range of nuclei are reported in the section on Incoherent Reactions. Finally, the development and performance of detectors produced by the laboratory are described in the section titled Instrumentation.

  2. Installation of a stoker-coal preparation plant in Krakow, Poland. Quarterly technical progress report No. 3, November--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    Rozelle, P.

    1996-01-01

    This report describes the progress made during this reporting period of a two year project to demonstrate that the air pollution from a traveling grate stoker being used to heat water at a central heating plant in Krakow, Poland can be reduced significantly by (1) substituting the unwashed, unsized coal currently being used with a mechanically cleaned, double-sized stoker fuel and by (2) optimizing the operating parameters of the stoker. It is anticipated that these improvements will prove to be cost effective and hence be adopted by the other central heating plants in Krakow and indeed, throughout Eastern European cities where coal continues to be the primary source of fuel. EFH Coal Company has formed a partnership with two Polish institutions -- MPEC, a central heating company in Krakow, and Naftokrak-Naftobudowa, preparation plant designers and fabricators, for the execution of this effort. The washability data from a 20mm x 0.5mm size fraction of raw coal from the Nikwa Modrejow Mine were evaluated. The data show that the ash content of this coal can be reduced from 34.0 percent to 9.0 percent by washing in a heavy-media cyclone at 1.725 sp.gr.; the actual yield of clean coal would be 63.1 percent. This product would meet compliance limitations of 500 a of SO{sub 2}/GJ. An evaluation of the predicted results that can be expected when washing five different candidate Polish coals shows that compliance products containing less than 640 a SO{sub 2}/GJ and 10 percent ash at attractive yields can be produced by washing the raw coals in a heavy-media cyclone. Discussions with financial institutions regarding the cost of producing a quality stoker coal in Poland and for identifying sources of private capital to help cost share the project continued. The search for markets for utilizing surplus production from the new plant continued.

  3. Cadmium sulfide/copper sulfide heterojunction cell research by sputter deposition. Quarterly technical progress report, March 1, 1981-June 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, J.A.; Anderson, W.W.; Meakin, J.D.

    1981-08-01

    A second series of hybrid cells with sputter-deposited Cu/sub 2/S layers has been fabricated. An efficiency of about 4 3/4%, without antireflection coating, was achieved for one of the cells. This result approaches the 5 3/4% which was achieved in the first set (different Cu/sub 2/S deposition conditions) and confirms the viability of the sputtering process for this application. Significant progress has been made in fabricating all-sputtered cells with CdS layers deposited by planar magnetron reactive sputtering. Efficiencies of approximately 3%, without antireflection coatings, have been achieved in the as-deposited state for seven cells. Individual cells have yielded a J/sub sc/ of 12 mA/cm/sup 2/, a V/sub oc/ of 0.53V, and a fill factor of 0.72. Taken together these parameters would yield an efficiency of 4 1/2%. A strong coupling is found between the properties of the Cu/sub 2/S and CdS layers. However, the conditions which maximize J/sub sc/, V/sub oc/ and the fill factor do not appear to be mutually exclusive. Reflectance measurements indicate that 30% or more of the incident radiation is being reflected from the front surface of the cells over the wavelength range of the solar spectrum. Thus optimization of the cell parameters with a suitable antireflection coating should yield cell efficiencies of about 6%. Characterization of the junctions formed in the all-sputtered cells under near-optimum deposition conditions indicates that they have remarkable properties in their as-deposited state, being very similar to high performance conventional cells after heat treatment. Junction ideality factors are about unity in the light, with J/sub 0/ values of about 2 x 10/sup -8/ mA/cm/sup 2/. Interface recombination velocities are as low as a few times 10/sup 5/ cm/sec. CdS depletion layer widths are about 2000 nm in the dark and collapse to about 200 nm under illumination.

  4. Cadmium sulfide/copper sulfide heterojunction cell research by sputter deposition. Quarterly technical progress report, March 1, 1981-June 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, J.A.; Anderson, W.W.; Meakin, J.D.

    1981-08-01

    A second series of hybrid cells with sputter-deposited Cu/sub 2/S layers has been fabricated. An efficiency of about 4 3/4%, without antireflection coating, was achieved for one of the cells. This result approaches the 5 3/4% which was achieved in the first set (different Cu/sub 2/S deposition conditions) and confirms the viability of the sputtering process for this application. Significant progress has been made in fabricating all-sputtered cells with CdS layers deposited by planar magnetron reactive sputtering. Efficiencies of approximately 3%, without antireflection coatings, have been achieved in the as-deposited state for seven cells. Individual cells have yielded a J/sub sc/ of 12 mA/cm/sup 2/, a V/sub oc/ of 0.53V, and a fill factor of 0.72. Taken together these parameters would yield an efficiency of 4 1/2%. A strong coupling is found between the properties of the Cu/sub 2/S and CdS layers. However, the conditions which maximize J/sub sc/, V/sub oc/ and the fill factor do not appear to be mutually exclusive. Reflectance measurements indicate that 30% or more of the incident radiation is being reflected from the front surface of the cells over the wavelength range of the solar spectrum. Thus optimization of the cell parameters with a suitable antireflection coating should yield cell efficiencies of about 6%. Characterization of the junctions formed in the all-sputtered cells under near-optimum deposition conditions indicates that they have remarkable properties in their as-deposited state, being very similar to high performance conventional cells after heat treatment. Junction ideality factors are about unity in the light, with J/sub 0/ values of about 2 x 10/sup -8/ mA/cm/sup 2/. Interface recombination velocities are as low as a few times 10/sup 5/ cm/sec. CdS depletion layer widths are about 2000 nm in the dark and collapse to about 200 nm under illumination.

  5. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1995--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1995-12-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-95. It describes 80 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal energy cost evaluation and marketing strategy for geothermal district heating. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  6. Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

  7. Valve development for coal gasification plants: Phase I to Phase II transition. Quarterly technical program report, May--July 1978

    Energy Technology Data Exchange (ETDEWEB)

    Bellezza, D.

    1978-08-01

    This is the eighth in a series of Quarterly Technical Progress Reports relating to the Valve Development for Coal Gasification Plants Program. This document discusses engineering progress during the period of May to July 1978. The work described herein represents a continuation of the Phase I seat development effort for the Task III valve and the continuation of design engineering effort, necessary to prepare detail manufacturing drawings for use in the production of prototype valves during Phase II of this program. Work performed during this quarter consists of: valve design, thermal and stress analysis of valves, design detailing and specifications, quality assurance planning and various tests as outlined.

  8. Quarterly Progress Report (April 1 to June 30, 1950)

    Energy Technology Data Exchange (ETDEWEB)

    Brookhaven National Laboratory

    1950-07-01

    This is the second of a series of Quarterly Progress Reports. While most of the departments have summarized their work or used a form comparable to abstracts, the Chemistry Department has given both abstracts and complete reports on its work. The major part of the progress in the Reactor Science and Engineering Department is being presented simultaneously in a separate classified report. There are reports from the following departments: (1) physics department; (2) instrumentation and health physics department; (3) accelerator project; (4) chemistry department; (5) reactor science and engineering department; (6) biology department; and (7) medical department.

  9. Geothermal direct-heat utilization assistance: Quarterly project progress report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The report summarizes geothermal activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-95. It describes 92 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research activities are summarized on geothermal energy cost evaluation, low temperature resource assessment and ground-source heat pump case studies and utility programs. Outreach activities include the publication of a geothermal direct heat Bulletin, dissemination of information, geothermal library, and progress monitor reports on geothermal resources and utilization.

  10. Regulatory and technical reports (abstract index journal). Compilation for third quarter 1997, July--September

    Energy Technology Data Exchange (ETDEWEB)

    Stevenson, L.L.

    1998-01-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. This report contains the third quarter 1997 abstracts.

  11. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1996-11-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  12. Baseline gas turbine development program. Eighteenth quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, F W; Wagner, C E [comps.

    1977-04-30

    Progress is reported for a program whose goals are to demonstrate an experimental upgraded gas turbine powered automobile which meets the 1978 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, compact-size American automobile. Initial running of the upgraded engine took place on July 13, 1976. The engine proved to be mechanically sound, but was also 43% deficient in power. A continuing corrective development effort has to date reduced the power deficiency to 32%. Compressor efficiency was increased 2 points by changing to a 28-channel diffuser and tandem deswirl vanes; improved processing of seals has reduced regenerator leakage from about 5 to 2.5% of engine flow; a new compressor turbine nozzle has increased compressor turbine stage efficiency by about 1 point; and adjustments to burner mixing ports has reduced pressure drop from 2.8 to 2.1% of engine pressure. Key compressor turbine component improvements are scheduled for test during the next quarterly period. During the quarter, progress was also made on development of the Upgraded Vehicle control system; and instrumentation of the fourth program engine was completed by NASA. The engine will be used for development efforts at NASA LeRC.

  13. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  14. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  15. Quarterly Progress Report (January 1 to March 31, 1950)

    Energy Technology Data Exchange (ETDEWEB)

    Brookhaven National Laboratory

    1950-04-01

    This is the first of a series of Quarterly Reports. These reports will deal primarily with the progress made in our scientific program during a three months period. Those interested in matters pertaining to organization, administration, complete scientific program, personnel and other matters not directly involved in current scientific progress are referred to our Annual Progress Report which is issued in January. We have attempted to describe new information that appears significant, or of interest, to other scientists within the Atomic Energy Commission Laboratories. No effort has been made, however, to detail progress in each and every research project. Little or no reference will therefore be found to the projects in which progress during the current period is considered too inconclusive. Since our organizational structure is departmental, the work described herein is arranged in the following sequence: (1) Accelerator Project; (2) Biology Department; (3) Chemistry Department; (4) Instrumentation and Health Physic8 Department; (5) Medical Department; (6) Physics Department; and (7) Reactor Science and Engineering Department.

  16. Quarterly Progress Report Fuels Development Operation October - December 1960

    Energy Technology Data Exchange (ETDEWEB)

    Cadwell, J. J. [Hanford Site (HNF), Richland, WA (United States); Tobin, J. C. [Hanford Site (HNF), Richland, WA (United States); Last, G. A. [Hanford Site (HNF), Richland, WA (United States); Evans, E. A. [Hanford Site (HNF), Richland, WA (United States); Minor, J. E. [Hanford Site (HNF), Richland, WA (United States)

    1961-01-13

    The present Quarterly Report is the continuation of a series issued by the new Fuels Development Operation. Reports in this series combine portions of the quarterly reports by the former Metallurgy Research and Fuel Technology Sub-Sections.

  17. Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the U.S. Department of Energy. Quarter ending December 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Davis, G.; Mansur, D.L.; Ruhter, W.D.; Strauch, M.S.

    1997-01-01

    The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the First Quarter of Fiscal Year 1997 (October through December, 1996). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise. These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in four areas: (1) safeguards technology; (2) safeguards and material accountability; (3) computer security--distributed systems; and (4) physical and personnel security support. The remainder of this report describes the activities in each of these four areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.

  18. Lawrence Livermore National Laboratory Safeguards and Security quarterly progress report to the US Department of Energy: Quarter ending December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Davis, G.; Mansur, D.L.; Ruhter, W.D.; Steele, E.; Strait, R.S.

    1994-01-01

    The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the first quarter of fiscal year 1994 (October through December, 1993). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise. These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in five areas: (1) Safeguards Technology, (2) Safeguards and Decision Support, (3) Computer Security, (4) DOE Automated Physical Security, and (5) DOE Automated Visitor Access Control System. This report describes the activities in each of these five areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.

  19. Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the US Department of Energy: Quarter ending September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Ruhter, W.D.; Strait, R.S.; Mansur, D.L.; Davis, G.

    1993-10-01

    The Lawrence Livermore National Laboratory (LLNL) carries out safeguards and security activities for the Department of Energy (DOE), Office of Safeguards and Security (OSS), as well as other organizations, both within and outside the DOE. This document summarizes the activities conducted for the OSS during the fourth quarter of Fiscal Year 1993 (July through September, 1993). The nature and scope of the activities carried out for OSS at LLNL require a broad base of technical expertise. To assure projects are staffed and executed effectively, projects are conducted by the organization at LLNL best able to supply the needed technical expertise. These projects are developed and managed by senior program managers. Institutional oversight and coordination is provided through the LLNL Deputy Director`s office. At present, the Laboratory is supporting OSS in five areas: Safeguards Technology, Safeguard System Studies, Computer Security, DOE Automated Physical Security and DOE Automated Visitor Access Control System. The remainder of this report describes the activities in each of these five areas. The information provided includes an introduction which briefly describes the activity, summary of major accomplishments, task descriptions with quarterly progress, summaries of milestones and deliverables and publications published this quarter.

  20. Tribopolymerization as an anti-wear mechanism. Quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Furey, M.J.

    1996-04-01

    The primary objective of this activity is to obtain the necessary data which would enhance, promote, and encourage the introduction of advanced lubrication technology into the marketplace. This includes (a) defining specific but different applications, (b) establishing the limits or ranges of applied loads, speeds, and temperatures over which the concept of tribopolymerization would work in reducing wear and/or friction, (c) continuing in efforts to understand the film-forming process (this rates to (b) above), using this knowledge to develop new and even more effective additives, and (d) exploring possible connections with private and investment companies for the licensing and marketing of products which will reduce friction and wear in a variety of applications. Progress was made in several different but connected areas. These included (a) establishing of load/velocity limits of selected monomers for ceramic lubrication, (b) the discovery of new and effective monomers designed for higher temperature anti-wear applications, (c) improvements and modifications of the high load/high speed pin-on-disk machine, (d) the initiation of related or spin-off projects designed to get their advanced technology into the marketplace, (e) the filing of three new patent applications, and (f) collaborative research with Dr. Kajdas--the co-inventor with Dr. Furey--on tribopolymerization as a novel and effective approach to the boundary lubrication of ceramics and steel. These and other elements of progress made during the first Quarter of 1996 are discussed briefly.

  1. Quarterly Performance/Technical Report of the National Marrow Donor Program (Trademark)

    Science.gov (United States)

    2008-04-30

    for HLA testing. During this quarter: · Results were received for the First Time Point of the Quality Control (QC) sample portion of the study...The next time point for the QC sample portion is June, 2008. National Marrow Donor Program® N000014-06-1-0704 QUARTER PROGRESS REPORT...Technology ASHI American Society for Histocompatibility and Immunogenetics IRB Institutional Review Board B-LCLs B-Lymphoblastoid Cell Lines KIR Killer

  2. Damage analysis and fundamantal studies. Quarterly progress report, April--June 1978

    Energy Technology Data Exchange (ETDEWEB)

    Zwilsky, Klaus M.

    1979-05-01

    This report is the second in a series of Quarterly Technical Progress Reports on Damage Analysis and Fundamental Studies (DAFS) which is one element of the Fusion Reactor Materials Program, conducted in support of the Magnetic Fusion Energy Program. This report is organized along typical lines in parallel to a Program Plan of the same title (to be published) so that activities and accomplishments may be followed readily relative to that Program Plan. Thus, the work of a given laboratory may appear throughout the report. Chapters 1 and 2 report topics which are generic to all of the DAFS Program: DAFS Task Group Activities and Irradiation Test Facilities, respectively. Chapters 3, 4, and 5 report the work that is specific to each of the subtasks around which the program is structured: A) Environmental Characterization, B) Damage Production, and C) Damage Microstructure Evolution and Mechanical Behavior.

  3. Damage analysis and fundamental studies. Quarterly progress report, January--March 1979

    Energy Technology Data Exchange (ETDEWEB)

    Zwilsky, Klaus M.

    1979-05-01

    This report is the fifth in a series of Quarterly Technical Progress Reports on Damage Analysis and Fundamental Studies (DAFS) which is one element of the Fusion Reactor Materials Program, conducted in support of the Magnetic Fusion Energy Program. This report is organized along topical lines in parallel to a Program Plan of the same title (to be published) so that activities and accomplishments may be followed readily relative to that Program Plan. Thus, the work of a given laboratory may appear throughout the report. Chapters 1 and 2 report topics which are generic to all of the DAFS Program: DAFS Task Group Activities and Irradiation Test Facilities, respectively. Chapters 3, 4, and 5 report the work that is specific to each of the subtasks around which the program is structured: A) Environmental Characterization, B) Damage Production, and C) Damage Microstructure Evolution and Mechanical Behavior.

  4. Increased oil production and reserves utilizing secondary/tertiary recovery techniques on small reservoirs in the Paradox basin, Utah. Quarterly technical progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Allison, M.L.

    1996-08-01

    The primary objective of this project is to enhance domestic petroleum production by demonstration and technology transfer of an advanced oil recovery technology in the Paradox basin, southeastern Utah. If this project can demonstrate technical and economic feasibility, the technique can be applied to approximately 100 additional small fields in the Paradox basin alone, and result in increased recovery of 150 to 200 million barrels of oil. This project is designed to characterize five shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation and choose the best candidate for a pilot demonstration project for either a waterflood or carbon dioxide (CO{sub 2}-)flood project. The field demonstration, monitoring of field performance, and associated validation activities will take place in the Paradox basin within the Navajo Nation. The results of this project will be transferred to industry and other researchers through a petroleum extension service, creation of digital databases for distribution, technical workshops and seminars, field trips, technical presentations at national and regional professional meetings, and publication in newsletters and various technical or trade journals.

  5. Technical progress in pipeline design and construction

    Energy Technology Data Exchange (ETDEWEB)

    Hausken, K.B.

    1995-12-31

    This paper considers the technical progress in offshore pipeline construction with limitation to some general subjects covering pipeline design, installation and start-up. In future the use of limit state pipeline design philosophy, may be implemented as an alternative to the stress based design commonly used to day giving a potential for further optimisation of the pipeline design and consequently reduction of the initial investment. Comprehensive research and development efforts in Norway in the second half of the 1970`s, made it technically feasible to cross the deep water Norwegian Trench in the 1980`s. In addition, the development of several offshore pipeline systems until to day including gas distribution systems to the European continent, have brought Norway to the forefront of technical expertise

  6. Regulatory and technical reports: (Abstract index journal). Compilation for first quarter 1997, January--March

    Energy Technology Data Exchange (ETDEWEB)

    Sheehan, M.A.

    1997-06-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. This compilation is published quarterly and cummulated annually. Reports consist of staff-originated reports, NRC-sponsored conference reports, NRC contractor-prepared reports, and international agreement reports.

  7. Wolsong 2, 3 and 4 quarterly progress review report on NSSS design and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Sung Hoon; Kim, Sun Kee; Park, Tae Keu [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-10-01

    This is the Quarterly Progress Review Report for Wolsong NPP 2, 3 and 4 NSSS Design and Engineering which evaluates the performance of the project and describes the project highlight, manpower loading status, design and engineering and project related meetings by quarterly basis. 26 figs., 13 tabs. (Author).

  8. Aircraft Nuclear Propulsion Program: Quarterly Progress Report for Period Ending December 31, 1956, Part 1 - 5

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, W. H. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Cramer, S. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Miller, A. J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    1957-03-12

    This quarterly progress report of the Aircraft Nuclear Propulsion Project at ORNL records the technical progress of the research on circulating-fuel reactors and other ANP research at the Laboratory under its Contract W-7405-eng-26. The report is divided into five major parts: 1. Aircraft Reactor Engineering, 2. Chemistry, 3. Metallurgy, 4. Heat Transfer and Physical Properties, Radiation Damage, and Fuel Recovery and Reprocessing, and 5. Reactor Shielding. The ANP Project is comprised of about 550 technical and scientific personnel engaged in many phases of research directed toward the achievement of nuclear propulsion of aircraft. A considerable portion of this research is performed in support of the work of other organizations participating in the national ANP effort. However, the bulk of the ANP research at ORNL is directed toward the development of a circulating-fuel type of reactor. The design, construction, and operation of the Aircraft Reactor Test (ART), with the cooperation of the Pratt & Whitney Aircraft Division, are the current objectives of the project. The ART is to be a power plant system that will include a 60-Mw circulating fuel reflector-moderator reactor and adequate means for heat disposal. Operation of the system will be for the purpose of determining feasibility and for studying the problems associated with the design, construction, and operation of a high-power circulating-fuel refIector-moderated aircraft reactor system.

  9. Quarterly Program Progress Report April 1, 2002-June 30, 2002

    Energy Technology Data Exchange (ETDEWEB)

    Palafox, Neal A., MD, MPH

    2002-07-31

    DOE B188 DOE/PHRI Special Medical Care Program in the Republic of the Marshall Islands (RMI)Quarterly Program Progress Report The DOE/PHRI Special Medical Care Program continues to provide, on a year round basis, a broad spectrum of medical care to the DOE patient population. During the fourth quarter of Year 4, the following medical services were provided: (1) Annual medical examinations for the DOE patient population (see Exhibit 1 for details). (2) Medications for the DOE patient population. (3) Preventive and primary medical care to the DOE patient population in the RMI as time and resources permit. (4) Additional manpower for the outpatient clinics at Ebeye and Majuro Hospitals (see Exhibit 2 for details). (5) Ancillary services such as labs, radiology and pharmacy in coordination with Kwajalein Hospital, Majuro Hospital and the 177 Health Care Program (177 HCP). (6) Referrals to Ebeye Hospital, Majuro Hospital and Kwajalein Hospital as necessary. (7) Referrals to Straub Clinic and Hospital in Honolulu as necessary (for details see Exhibit 1). (8) Monitored and adjusted monthly annual examination schedules based on equipment failure at Kwajalein. In addition to the above, the program was also involved in the following activities during this quarter: (1) Organized and conducted continuing medical education (CME) talks for the program's RMI staff and other RMI healthcare workers. (2) Held meetings with RMI government officials and Local Atoll government officials. (3) Input past medical records into the Electronic Medical Record (EMR) system. (4) Made adjustments to and created more templates for the EMR system. (5) Coordinated with the Public Health Departments on Majuro and Ebeye. (6) Met with PEACESAT to discuss possible collaboration on high speed Internet access. (7) Looked for opportunities to expand the program's telehealth capabilities. (8) Participated in the DOE-RMI Meeting in Honolulu. (9) Finalized the agreement with the RMI Ministry of

  10. Los Alamos National Laboratory Science Education Programs. Quarterly progress report, April 1--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Gill, D.

    1995-09-01

    This report is quarterly progress report on the Los Alamos National Laboratory Science Education Programs. Included in the report are dicussions on teacher and faculty enhancement, curriculum improvement, student support, educational technology, and institutional improvement.

  11. Baseline Gas Turbine Development Program seventh quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, F.W.

    1974-07-30

    Progress is reported for a program to demonstrate by 1976 an experimental gas turbine powered automobile which meets the 1976 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, standard size American automobile. All of the baseline vehicles are now operational and are performing Program tests. Vehicle tests completed in this quarter include noise reduction, heater, air conditioning, and underhood temperature evaluations. Testing was completed on the original endurance engine. Test cell evaluation of the government furnished combustor (Solar) has commenced. Vendor A and Vendor B ceramic regenerator cores were rig tested with an improved elastomeric drive. Vendor A cores with the elastomeric drive are being engine tested. Ceramic regenerator seal wear test rig results are showing promise of achieving a low friction, non-nickel-oxide rubbing surface. The first preprototype integrated control system was delivered and placed in operation on a baseline engine in a test cell. Six ribbed compressor turbine wheels made of IN 792/Hf by the AiResearch Airefrac process were received. Rig testing of the variable inlet guide Vanes was completed and engine testing initiated. Vehicle evaluations of the torque converter lock-up were completed . Specifications for the Upgraded Engine aerodymanic components were made. A subcontract is currently being arranged with Mechanical Technology Inc. (MTI) for design and development of the upgraded engine gas generator bearings and shaft system. An initial feasibility study for gas bearings was completed. Analytical design of the upgraded engine power turbine reduction gears and bearings has commenced. Engine and vehicle accessory drive studies for the upgraded engine are well underway.

  12. Fusion Power Program. Quarterly progress report, October--December 1978

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    This quarterly report summarizes the Argonne National Laboratory work performed for the Office of Fusion Energy during the October--December 1978 quarter in the following research and development areas: materials; energy storage and transfer; tritium containment, recovery and control; advanced reactor design; atomic data; reactor safety; fusion-fission hybrid systems; alternate applications of fusion energy; and other work related to fusion power. Three separate abstracts were prepared for the included sections. (MOW)

  13. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  14. Los Angeles County Juvenile Justice Crime Prevention Act. RAND Quarterly Report, October 2008. Technical Report

    Science.gov (United States)

    Fain, Terry; Turner, Susan; Ridgeway, Greg

    2009-01-01

    This document is the second quarterly progress report for the evaluation of Juvenile Justice Crime Prevention Act (JJCPA) programs for the Los Angeles County Probation Department. The report covers the period from July 1, 2008, through September 30, 2008. The intent of the report is to provide Probation and the community-based organizations (CBOs)…

  15. Innovative Clean Coal Technology (ICCT): Demonstration of Selective Catalytic Reduction (SCR) technology for the control of nitrogen oxide (NO{sub x}) emissions from high-sulfur coal-fired boilers. Third quarterly technical progress report 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-11-01

    The objective of this project is to demonstrate and evaluate commercially available Selective Catalytic Reduction (SCR) catalysts from US, Japanese and European catalyst suppliers on a high-sulfur US coal-fired boiler. SCR is a post-combustion nitrogen oxide (NO{sub x}) control technology that involves injecting ammonia into the flue gas generated from coal combustion in an electric utility boiler. The flue gas containing ammonia is then passed through a reactor that contains a specialized catalyst. In the presence of the catalyst, the ammonia reacts with NO{sub x} to convert it to nitrogen and water vapor. Although SCR is widely practiced in Japan and Europe on gas-, oil-, and low-sulfur, coal-fired boilers, there are several technical uncertainties associated with applying SCR to US coals. These uncertainties include: (1) potential catalyst deactivation due to poisoning by trace metal species present in US coals that are not present in other fuels. (2) performance of the technology and effects on the balance-of-plant equipment in the presence of high amounts of SO{sub 2} and SO{sub 3} and (3) performance of a wide variety of SCR catalyst compositions, geometries and methods of manufacture under typical high-sulfur coal-fired utility operating conditions. These uncertainties will be explored by constructing a series of small- scale SCR reactors and simultaneously exposing different SCR catalysts to flue gas derived from the combustion of high-sulfur US coal. The demonstration will be performed at Gulf Power Company`s Plant Crist Unit No. 5 (75 MW capacity) near Pensacola, Florida.

  16. Innovative Clean Coal Technology (ICCT): Demonstration of selective catalytic reduction (SCR) technology for the control of nitrogen oxide (NO{sub x}) emissions from high-sulfur coal-fired boilers. Technical progress report, third and fourth quarters 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The objective of this project is to demonstrate and evaluate commercially available selective catalytic reduction (SCR) catalysts from U.S., Japanese, and European catalyst suppliers on a high-sulfur U.S. Coal-fired boiler. SCR is a post-combustion nitrogen oxide (NO{sub x}) control technology that involves injecting ammonia into the flue gas generated from coal combustion in an electric utility boiler. The flue gas containing ammonia is then passed through a reactor that contains a specialized catalyst. In the presence of the catalyst, the ammonia reacts with NO{sub x} to form nitrogen and water vapor. Although SCR is widely practiced in Japan and European gas-, oil-, and low-sulfur coal-fired boilers, there are several technical uncertainties associated with applying SCR to U.S. coals. These uncertainties include: (1) potential catalyst deactivation due to poisoning by trace metal species present in U.S. coals that are not present in other fuels; (2) performance of the technology and effects on the balance-of-plant equipment in the presence of high amounts of SO{sub 2} and SO{sub 3}; performance of a wide variety of SCR catalyst compositions, geometries, and methods of manufacture under typical high-sulfur coal-fired utility operating conditions. These uncertainties are being explored by operating a series of small- scale SCR reactors and simultaneously exposing different SCR catalysts to flue gas derived from the combustion of high sulfur U.S. coal. The demonstration is being performed at Gulf Power Company`s Plant Crist Unit No. 5 (75 MW capacity) near Pensacola, Florida. The project is funded by the U.S. Department of Energy (DOE), Southern Company Services, Inc. (SCS on behalf of the entire Southern electric system), the Electric Power Research Institute (EPRI), and Ontario Hydro. SCS is the participant responsible for managing al aspects of this project. 1 ref., 69 figs., 45 tabs.

  17. Demonstration of Selective Catalytic Reduction (SCR) technology for the control of nitrogen oxide (NO{sub x}) emissions from high-sulfur coal-fired boilers. Technical progress report, first and second quarters 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The objective of this project is to demonstrate and evaluate commercially available Selective Catalytic Reduction (SCR) catalysts from U.S., Japanese and European catalyst suppliers on a high-sulfur U.S. coal-fired boiler. SCR is a post-combustion nitrogen oxide (NO{sub x}) control technology that involve injecting ammonia into the flue gas generated from coal combustion in a boiler. The flue gas containing ammonia is then passed through a reactor that contains a specialized catalyst. In the presence of the catalyst, the ammonia reacts with NO{sub x} to form nitrogen and water vapor. Although SCR is widely practiced in Japan and Europe on gas-, oil-, and low-sulfur coal-fired boilers, there are several technical uncertainties associated with applying SCR to U.S. coals. These uncertainties include: (1) potential catalyst deactivation due to poisoning by trace metal species present in U.S. coals that are not present in other fuels; (2) performance of the technology and effects on the balance-of-plant equipment in the presence of high amounts of SO{sub 2} and SO{sub 3}; and (3) performance of a wide variety of SCR catalyst compositions, geometries and methods of manufacture under typical high-sulfur coal-fired utility operating conditions. These uncertainties are being explored by operating a series of small-scale SCR reactors and simultaneously exposing different SCR catalysts to flue gas derived from the combustion of high sulfur U.S. coal. The project is being conducted in the following three phases: permitting, environmental monitoring plan and preliminary engineering; detailed design engineering and construction; and operation, testing, disposition and final report. The project was in the operation and testing phase during this reporting period. Accomplishments for this period are described.

  18. Innovative Clean Coal Technology (ICCT): Demonstration of selective catalytic reduction technology for the control of nitrogen oxide emissions from high-sulfur coal-fired boilers. First and second quarterly technical progress reports, [January--June 1995]. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The objective of this project is to demonstrate and evaluate commercially available Selective Catalytic Reduction (SCR) catalysts from US, Japanese and European catalyst suppliers on a high-sulfur US coal-fired boiler. SCR is a post-combustion nitrogen oxide (NO{sub x}) control technology that involves injecting ammonia (NH{sub 3}) into the flue gas generated from coal combustion in an electric utility boiler. The flue gas containing ammonia is then passed through a reactor containing a specialized catalyst. In the presence of the catalyst, the ammonia reacts with NO{sub x} to convert it to nitrogen and water vapor. Although SCR is widely practiced in Japan and Europe on gas-, oil-, and low-sulfur coal-fired boilers, there are several technical uncertainties associated with applying SCR to US coals. These uncertainties include: (1) potential catalyst deactivation due to poisoning by trace metal species present in US coals that are not present in other fuels. (2) performance of the technology and effects on the balance-of-plant equipment in the presence of high amounts of SO{sub 2} and SO{sub 3}. (3) performance of a wide variety of SCR catalyst compositions, geometries, and methods of manufacture under typical high-sulfur coal-fired utility operating conditions. These uncertainties are being explored by operating a series of small-scale SCR reactors and simultaneously exposing different SCR catalysts to flue gas derived from the combustion of high sulfur US coal. The demonstration is being performed at Gulf Power Company`s Plant Crist Unit No. 5 (75 MW nameplate capacity) near Pensacola, Florida. The project is funded by the US Department of Energy (DOE), Southern Company Services, Inc. (SCS on behalf of the entire Southern electric system), the Electric Power Research Institute (EPRI), and Ontario Hydro. SCS is the participant responsible for managing all aspects of this project.

  19. Coal Combustion Science quarterly progress report, April--June 1990

    Energy Technology Data Exchange (ETDEWEB)

    Hardesty, D.R. (ed.); Baxter, L.L.; Fletcher, T.H.; Mitchell, R.E.

    1990-11-01

    This document provides a quarterly status report of the Coal Combustion Science Program that is being conducted at the Combustion, Research Facility, Sandia National Laboratories, Livermore, California. Coal devolatilization, coal char combustion, and fate of mineral matter during coal combustion. 56 refs., 25 figs., 13 tabs.

  20. Quarterly Progress Report Metallurgy Development Operation: October - December 1963

    Energy Technology Data Exchange (ETDEWEB)

    Wick, O. J. [Hanford Site (HNF), Richland, WA (United States). Metallurgy Development Operation; Last, G. A. [Hanford Site (HNF), Richland, WA (United States). Metallurgy Development Operation. Fuels Design; Minor, J. E. [Hanford Site (HNF), Richland, WA (United States). Metallurgy Development Operation. Metal Fabrication Development; Nelson, T. C. [Hanford Site (HNF), Richland, WA (United States). Metallurgy Development Operation. Plutonium Product Development; Stewart, R. W. [Hanford Site (HNF), Richland, WA (United States). Metallurgy Development Operation. Plutonium Metallurgy Development

    1964-01-20

    The present Quarterly Report covers the Metallurgy Development Operation from October to December 1963 and includes research conducted by the Fuels Design, Metal Fabrication Development, Plutonium Product Development, and Plutonium Metallurgy Development Operations. The titles of the chapters are the following: Metallic Fuels Design, Metallic Fuel Development, Refractory Metals and Fuel Development, and Plutonium Physical Metallurgy.

  1. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  2. TNS quarterly progress report, January--March 1977

    Energy Technology Data Exchange (ETDEWEB)

    Flanagan, C.A.; Varljen, T.C.; Heck, F.M.; Gibson, G.; French, J.W. (eds.)

    1977-04-01

    The TNS effort during the January-February-March, 1977 period included the completion of the first iteration of an assessment of the Research, Development and Demonstration needs for TNS and further development of system size and cost models to support TF coil technology and plasma size trade studies. The following material highlights key accomplishments during the quarter which are discussed in greater detail in subsequent sections.

  3. Technical Division quarterly progress report, April 1--June 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Slansky, C.M.; Dickey, B.R.; Musgrave, B.C.; Rohde, K.L.

    1977-07-01

    Fuel Cycle Research and Development: Results are presented on the fluidized-bed calcination of high-level radioactive waste from reprocessing on the post treatment of the calcine, and on the removal of actinide elements from the waste prior to calcination. Other projects include the development of storage technology for /sup 85/Kr waste; a study of the hydrogen mordenite catalyzed reaction between NO/sub x/ and NH/sub 3/; the adsorption and storage of /sup 129/I on silver exchanged mordenite; physical properties, materials of construction, and unit operations studies on the evaporation of high-level waste; the behavior of volatile radionuclides during the combustion of HTGR graphite-based fuel; and the use of the uranium-ruthenium system in age-dating uranium ore bodies. Special Materials Production: The long-term management of defense waste from the ICPP covers postcalcination treatment of ICPP calcined waste; the removal of actinide elements from first-cycle raffinate; the retrieval and handling of calcined waste from ICPP storage vaults; and the preparation of the ''Defense Waste Document''. Process improvements are reported on the Fluorinel headend process for Zircaloy-clad fuels and on uranium accountability measurements. Other development results cover the process for recovering spent Rover fuel, buried pipeline transfer systems, support to the Waste Management Program, and effluent monitoring methods evaluation and development. Other Projects Supporting Energy Development: In this category are studies on nuclear materials security; application of a liquid-solid fluidized-bed heat exchanger to the recovery of geothermal heat; in-plant reactor source term measurements; burnup methods for fast breeder reactor fuels; absolute thermal fission yield measurements; analytical support to light water breeder reactor development; research on analytical methods; and the behavior of environmental species of iodine.

  4. Quarterly technical progress report, October 1-December 30, 1983

    Energy Technology Data Exchange (ETDEWEB)

    1984-04-01

    Several new initiatives were begun in coal preparation, including a project to develop a liquid CO/sub 2/ coalescence process that will produce a superclean coal containing less than 1% ash. Another new project in this area is focusing on chemical coal cleaning for the removal of harmful trace elements, such as arsenic, lead, and zinc. Milestones were reached in both of our major electron beam flue gas cleanup projects. In the area of coal-water mixtures, our major industrial contracts are now approaching critical milestones. The analysis of our in-house combustion testing of micronized coal-water mixtures in PETC's 700-horsepower oil-designed boiler has been completed. By reducing the coal particle size from 90% minus 200 mesh down to 87% minus 19 microns, the carbon conversion efficiency increased from a level of 96% to 98%. Combustion tests with a commercially available CWM showed that combustion air enriched to 23% oxygen reduced the needed air preheat temperature from 370/sup 0/ to 200/sup 0/F. Work also got underway in the new projects selected last summer to investigate advanced direct liquefaction processes. At Kerr-McGee, three scoping runs on their 350 pound/day integrated bench-scale unit were successfully completed. The objective of these runs was to evaluate subbituminous coal process options in terms of catalyst performance, distillate yields, and generation of coke precursors. Cities Service began its project on the characterization of hydrogen donor solvents in two-stage liquefaction. 7 figures, 33 tables.

  5. HAMS II Quarterly Progress Report (Technical and Financial)

    Science.gov (United States)

    2015-01-09

    Capabilities for the system include: WiFi , Accelerometer, ECG, Pressure (altitude), Temperature, Pulse-ox, micro-SD and USB. Enclosure design concepts... channels of an ECG circuit process and limits the use of many differential amplifiers. Each channel is selectable for 3, 5 and 12 lead in software...and disables any unused channel . The basic block diagram layout is in Figure 4. The front-end board contains the following stages: • Defibrillator

  6. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  7. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  8. Coal combustion science. Quarterly progress report, July--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hardesty, D.R. [ed.; Baxter, L.L.; Davis, K.A.; Hurt, R.H.; Yang, N.Y.C.

    1995-09-01

    This document is a quarterly status report of the Coal Combustion Science Project that is being conducted at the Combustion Research Facility, Sandia National Laboratories, Livermore, California. The information reported is for the period July-September 1994. The objective of this work is to support the Office of Fossil Energy in executing research on coal combustion science. This project consists of basic research on coal combustion that supports both the Pittsburgh Energy Technology Center (PETC) Direct Utilization Advanced Research and Technology Development Program, and the International Energy Agency (IEA) Coal Combustion Science Project.

  9. Technical progress report, 1 April-30 June 1981

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    This report describes the technical accomplishments during the quarter ending June 1981, on the commercial nuclear waste management programs under the direction of the Office of Nuclear Waste Isolation (ONWI). The ONWI program is organized into 8 tasks entitled: systems, waste package, site, repository, regulatory and institutional, test facilities and excavations, land acquisition, and program management. Principal investigators in each of these areas have submitted summaries of quarterly highlights for inclusion in this report. Separate abstracts have been prepared for 5 of these tasks for inclusion in the Energy Data Base. (DMC)

  10. Geothermal direct-heat utilization assistance. Quarterly progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    Progress is reported on the following R&D activities: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Other activities are reported on technical assistance, technology transfer, and the geothermal progress monitor.

  11. Sludge Treatment Evaluation: 1992 Technical progress

    Energy Technology Data Exchange (ETDEWEB)

    Silva, L J; Felmy, A R; Ding, E R

    1993-01-01

    This report documents Fiscal Year 1992 technical progress on the Sludge Treatment Evaluation Task, which is being conducted by Pacific Northwest Laboratory. The objective of this task is to develop a capability to predict the performance of pretreatment processes for mixed radioactive and hazardous waste stored at Hanford and other US Department of Energy (DOE) sites. Significant cost savings can be achieved if radionuclides and other undesirable constituents can be effectively separated from the bulk waste prior to final treatment and disposal. This work is initially focused on chemical equilibrium prediction of water washing and acid or base dissolution of Hanford single-shell tank (SST) sludges, but may also be applied to other steps in pretreatment processes or to other wastes. Although SST wastes contain many chemical species, there are relatively few constituents -- Na, Al, NO[sub 3], NO[sub 2], PO[sub 4], SO[sub 4], and F -- contained in the majority of the waste. These constituents comprise 86% and 74% of samples from B-110 and U-110 SSTS, respectively. The major radionuclides of interest (Cs, Sr, Tc, U) are present in the sludge in small molal quantities. For these constituents, and other important components that are present in small molal quantities, the specific ion-interaction terms used in the Pitzer or NRTL equations may be assumed to be zero for a first approximation. Model development can also be accelerated by considering only the acid or base conditions that apply for the key pretreatment steps. This significantly reduces the number of chemical species and chemical reactions that need to be considered. Therefore, significant progress can be made by developing all the specific ion interactions for a base model and an acid dissolution model.

  12. Works Technical Department progress report, March 1961

    Energy Technology Data Exchange (ETDEWEB)

    None

    1961-04-19

    This document details the activities of the Savannah River Works Technical Department during the month of March 1961. Topics discussed are: Reactor Technology, Separations Technology, Engineering Assistance, Health Physics, Laboratories Overview, and Technical Papers Issued.

  13. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, April 1-June 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has accelerated the pace of cofiring development by increasing the testing activities plus the support activities for interpreting test results. Past tests conducted and analyzed include the Allen Fossil Plant and Seward Generating Station programs. On-going tests include the Colbert Fossil Plant precommercial test program, the Greenidge Station commercialization program, and the Blount St. Station switchgrass program. Tests in the formative stages included the NIPSCO cofiring test at Michigan City Generating Station. Analytical activities included modeling and related support functions required to analyze the cofiring test results, and to place those results into context. Among these activities is the fuel availability study in the Pittsburgh, PA area. This study, conducted for Duquesne Light, supports their initial investigation into reburn technology using wood waste as a fuel. This Quarterly Report, covering the third quarter of the FETC/EPRI Biomass Cofiring Program, highlights the progress made on the 16 projects funded under this cooperative agreement.

  14. Solar thermal power systems. Annual technical progress report, FY 1978

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    A technical progress report on the DOE Solar Thermal Power Systems Program is given. Emphasis is on the technical progress of the projects rather than on activities and individual contractor efforts. Each project description indicates its place in the prior to FY 1978 is given; the significant achievements and real progress of each project during FY 1978 are described; and future project activities as well as anticipated significant achievements for each project are forecast. (WHK)

  15. Fuel performance improvement program. Quarterly/annual progress report, October 1977--September 1978. [BWR; PWR

    Energy Technology Data Exchange (ETDEWEB)

    Crouthamel, C.E. (comp.)

    1978-10-01

    This quarterly/annual report reviews and summarizes the activities performed in support of the Fuel Performance Improvement Program (FPIP) during Fiscal Year 1978 with emphasis on those activities that transpired during the quarter ending September 30, 1978. Significant progress has been made in achieving the primary objectives of the program, i.e., to demonstrate commercially viable fuel concepts with improved fuel - cladding interaction (FCI) behavior. This includes out-of-reactor experiments to support the fuel concepts being evaluated, initiation of instrumented test rod experiments in the Halden Boiling Water Reactor (HBWR), and fabrication of the first series of demonstration rods for irradiation in the Big Rock Point Reactor (BRPR).

  16. Nuclear waste management quarterly progress report, April--June 1977

    Energy Technology Data Exchange (ETDEWEB)

    Platt, A.M. (comp.)

    1977-11-01

    Progress is reported in sections on decontamination and densification of chop-leach cladding residues, monitoring methods for effluents from waste solidification, TRU waste fixation studies, krypton solidification, /sup 14/C and /sup 129/I fixation, waste management system studies, waste isolation assessment, stored waste migration monitoring, properties of fission product organic complexes, and decontamination of metals. (JRD)

  17. Performance Plan: Progress Report 2nd Quarter Fiscal Year 2000.

    Science.gov (United States)

    Department of Education, Washington, DC. Student Financial Assistance.

    This document is progress report on the U.S. Department of Education's Student Financial Assistance (SFA) programs. Regarding its customer satisfaction objective, SFA notes that it looks to private sector leaders in e-commerce and promotes electronic services; offers electronic filing of the Free Application For Student Aid (FAFSA); offers most…

  18. Coal combustion science. Quarterly progress report, April 1993--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hardesty, D.R. [ed.

    1994-05-01

    This document is a quarterly status report of the Coal Combustion Science Project that is being conducted at the Combustion Research Facility, Sandia National Laboratories. The information reported is for Apr-Jun 1993. The objective of this work is to support the Office of Fossil Energy in executing research on coal combustion science. This project consists of basic research on coal combustion that supports both the PETC Direct Utilization Advanced Research and Technology Development Program, and the International Energy Agency Coal Combustion Science Project. The objective of the kinetics and mechanisms of pulverized coal char combustion task is to characterize the combustion behavior of selected US coals under conditions relevant to industrial pulverized coal-fired furnaces. Work is being done in four areas: kinetics of heterogeneous fuel particle populations; char combustion kinetics at high carbon conversion; the role of particle structure and the char formation process in combustion and; unification of the Sandia char combustion data base. This data base on the high temperature reactivities of chars from strategic US coals will permit identification of important fuel-specific trends and development of predictive capabilities for advanced coal combustion systems. The objective of the fate of inorganic material during coal combustion task is the establish a quantitative understanding of the mechanisms and rates of transformation, fragmentation, and deposition of inorganic material during coal combustion as a function of coal type, particle size and temperature, the initial forms and distribution of inorganic species in the unreacted coal, and the local gas temperature and composition. In addition, optical diagnostic capabilities are being developed for in situ, real-time detection of inorganic vapor species and surface species during ash deposition. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  19. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Geo-Heat Center provides technical assistance on geothermal direct heat applications to developers, consultants and the public which could include: data and information on low-temperature (< 1500 C) resources, space and district heating, geothermal heat pumps, greenhouses, aquaculture, industrial processes and other technologies. This assistance could include preliminary engineering feasibility studies, review of direct-use project plans, assistance in project material and equipment selection, analysis and solutions of project operating problems, and information on resources and utilization. The following are brief descriptions of technical assistance provided during the second quarter of the program.

  20. Valve development for coal gasification plants: Phase I. Quarterly technical program report, January--April 1978

    Energy Technology Data Exchange (ETDEWEB)

    Bellezza, D.

    1978-08-01

    This document discusses engineering and development progress during the period of January to April 1978. The work performed during this quarter consisted of: Successful development testing of seat and visor materials for Task I, II, and IV valve applications; continued seat and visor development for Task III valve application; successful development testing of bearing systems; completion of Phase I Conceptual Design and Functional Analysis effort; completion of the Phase I Summary Review report; improvements to the Hot Test fixture for use in further seat and visor development tests for Task III valve application.

  1. FETC/EPRI Biomass Cofiring Cooperative Agreement. Quarterly technical report, July 1-September 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, E.; Tillman, D.

    1997-12-01

    The FETC/EPRI Biomass Cofiring Program has completed one year of activity, accelerating the pace of cofiring development. Cofiring tests were completed at the Seward Generating Station of GPU Genco and at the Michigan City Generating Station of NIPSCO. The NYSEG work at Greenidge Station resulted in a workable, low cost method for injecting biofuels into coal-fired PC boilers. Support studies and modeling continued to provide analytics for the cofiring program. This report summarizes the activities during the fourth quarter of the FETC/EPRI Biomass Cofiring Cooperative Agreement. It focuses upon the results of testing in order to highlight the progress at utilities.

  2. Nuclear Waste Management quarterly progress report, October--December 1976

    Energy Technology Data Exchange (ETDEWEB)

    Platt, A.M. (comp.)

    1977-04-01

    Research topics on which progress is reported include decontamination and densification of chop-leach cladding residues, monitoring of effluents from waste solidification, TRU waste fixation, krypton solidification, /sup 14/C and /sup 129/I fixation, waste management system studies, organic complexes of fission products, characterization of 300 Area burial grounds, electropolishing as a decontamination technique, and decommissioning of Hanford facilities. 11 tables, 18 figures. (DLC)

  3. Baseline Gas Turbine Development Program. Fourteenth quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, F W; Wagner, C E

    1976-04-30

    Progress is reported for a Baseline Gas Turbine Development Program sponsored by the Heat Engine Systems Branch, Division of Transportation Energy Conservation (TEC) of the Energy Research and Development Administration (ERDA). Structurally, this program is made up of three parts: (1) documentation of the existing automotive gas turbine state-of-the-art; (2) conduction of an extensive component improvement program; and (3) utilization of the improvements in the design, and building of an Upgraded Engine capable of demonstrating program goals.

  4. Baseline Gas Turbine Development Program ninth quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, C.E.

    1975-01-31

    Progress is reported for a program to demonstrate by 1976 an experimental gas turbine powered automobile which meets the 1978 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, standard size American automobile. NASA completed the first phase of their baseline engine heat balance tests, and an upgraded engine compressor is being scaled for test. EPA completed their report on vehicle tests including emissions and vehicle performance, and a new endurance engine is on test. Significant development progress was made on both fixed and variable geometry combustors. After 45 hours of engine operation with Vendor A ceramic regenerator, no significant deterioration of the matrix, seals, or elastomeric mount was encountered. Ceramic regenerator stress analysis has commenced. Additional developments in non-nickel oxide regenerator rubbing seals are encouraging. The first preprototype integrated control system is in vehicle operation. Control adaptation for variable inlet guide vanes and water injection is progressing. AiRefrac turbine wheels were verified dimensionally and are being processed for engine testing. Water injection tests with a four nozzle system were run, and additional performance documentation of variable inlet guide vanes was obtained. Linerless insulation is on test in the free rotor engine, the new endurance engine, and a performance engine. The free rotor engine completed test cell checkout and was installed in a vehicle. Vehicle checkout, including a preprototype integrated control, is underway. Detailed specifications of the upgraded engine were written.

  5. Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1993-06-01

    Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

  6. Baseline Gas Turbine Development Program. Tenth quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, F.W.; Wagner, C.E.

    1975-04-30

    Progress is reported for a program to demonstrate by 1976 an experimental gas turbine powered automobile which meets the 1978 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, standard size American automobile. A fuel control system is being developed to allow program evaluation of a very promising low emissions, single stage, fixed geometry proprietary burner. Ceramic regenerators are under test in the free-rotor vehicle, and some have completed 30 hours of performance evaluation. Three-dimensional ceramic regenerator transient thermal and structural analysis programs are operational. Initial friction and wear test fixture results show that zirconium oxide fully stabilized by yttrium oxide is an effective substitute for nickel oxide in a plasma sprayed seal. A preprototype control system was adapted for variable inlet guide vane control in a vehicle installation. An evaluation of the free-rotor accessory drive concept in a vehicle showed no serious mechanical integrity problems. Simplifications are being made to the water injection system; significant metallurgical analysis of observed erosion/corrosion problems was accomplished. Variable inlet guide vane aerodynamic loss characteristics were determined. Generally satisfactory results with linerless insulation are resulting in extended use and application. Pattern work for the upgraded engine housing and the power turbine wheel castings are in process. A computer design analysis of the regenerator drive gears was made, and an analysis was completed of a three peripheral roller regenerator support and drive proposal for the upgraded engine.

  7. Baseline Gas Turbine Development Program. Eleventh quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, F.W.; Wagner, C.E.

    1975-07-31

    Progress is reported for a program to demonstrate by 1976 an experimental gas turbine powered automobile which meets the 1978 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, standard size American automobile. NASA completed initial heat balance testing of a baseline engine. An additional 450 hours were run on ceramic regenerators and seals. Seal wear rates are very good, and the elastomeric mounting system was satisfactory. An engine/control oil supply system based on the power steering pump is successfully operating in baseline vehicles. The design of the upgraded engine power turbine nozzle actuator was finalized, and layouts of the inlet guide vane actuator are in process. A lock-up torque converter was installed in the free rotor vehicle. Baseline engine and vehicle testing of water injection and variable inlet guide vanes was completed. A thermal analysis of the gas generator is in process. A steady-state, full power analysis was made. A three-dimensional stress analysis of the compressor cover was made. The power turbine nozzle actuating system layout was completed. The analytical studies of the power turbine rotor bearings were completed. MTI completed the design of the gas generator rotor simulation fixture and is starting to build it. Optimized reduction gears were successfully tested in a baseline engine.

  8. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC. Quarterly report January through March 2011. Year 1 Quarter 2 progress report.

    Energy Technology Data Exchange (ETDEWEB)

    Lottes, S. A.; Kulak, R. F.; Bojanowski, C. (Energy Systems)

    2011-05-19

    This project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at the Turner-Fairbank Highway Research Center for a period of five years, beginning in October 2010. The analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of January through March 2011.

  9. Heat Source Technology Programs. Quarterly progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    George, T.G. [comp.

    1993-12-01

    This quarterly report describes activities performed in support of Cassini fueled-clad production and studies related to the use of {sup 238}PuO{sub 2} in radioisotope power systems carried out for the Office of Special Applications of the US Department of Energy (DOE) by Los Alamos National Laboratory (LANL). Most of the activities described are ongoing; the results and conclusions described may change as the work progresses.

  10. Short-rotation woody-crops program. Quarterly progress report for period ending August 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Cushman, J.H.; Ranney, J.W.

    1982-04-01

    Progress of twenty-one projects in the Short Rotation Woody Crops Program is summarized for the period June 1 through August 31, 1981. Individual quarterly reports included from each of the projects discuss accomplishments within specific project objectives and identify recent papers and publications resulting from the research. The major program activities are species screening and genetic selection, stand establishment and cultural treatment, and harvest, collection, transportation, and storage.

  11. Short-rotation woody-crops program. Quarterly progress report for period ending May 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Cushman, J.H.; Ranney, J.W.

    1982-04-01

    Progress of twenty projects in the Short Rotation Woody Crops Program is summarized for the period March 1 through May 31, 1981. Individual quarterly reports included from each of the projects discuss accomplishments within specific project objectives and identify recent papers and publications resulting from the research. The major project activities are species screening and genetic selection, stand establishment and cultural treatment, and harvest, collection, transportation, and storage.

  12. Baseline Gas Turbine Development Program eighth quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, C.E.

    1974-10-31

    Progress is reported for a program to demonstrate by 1976 an experimental gas turbine powered automobile which meets the 1978 Federal Emissions Standards, has significantly improved fuel economy, and is competitive in performance, reliability, and potential manufacturing cost with the conventional piston engine powered, standard size American automobile. Major preparations for engine heat balance tests by NASA were completed. EPA laboratories completed Baseline vehicle emissions, noise, and odor tests. Assembly of the program endurance engine is nearing completion. Test cell evaluation of the government furnished combustor (Solar) verified steady state emissions to be extremely low. Initial engine tests of Vendor A ceramic regenerator cores with an elastomeric drive verified performance predictions. Efforts towards developing a non-nickel oxide regenerator seal show extreme sensitivity to porosity differences between cores of different suppliers. All three preprototype integrated control systems were built. Modifications are being worked out to achieve a stable low speed operation. Two prototype compressor turbine wheels made from the reuseable pattern process are being inspected and processed for testing. The engine housing modified for operation at higher cycle temperatures and pressures was received. The baseline engine converted to free rotor is completing test cell check out. The modified vehicle is ready for engine installation. The upgraded engine characterization was updated to include the latest information on V.I.G.V., rotors, and bearings. The upgraded engine housing is being modeled physically and analytically for design and stress studies. An accessory drive system for the upgraded engine was selected, and a final layout is in process.

  13. Regulatory and technical reports (abstract index journal). Volume 20, No. 2: Compilation for second quarter April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually.

  14. Technical Quarterly Progress Report - Advanced Gas Turbine Systems Research. Quarterly Report April 1 - June 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Some of the Major Accomplishments by AGTSR during this reporting period are: AGTSR`s five-year renewal proposal was approved by DOE- FETC and DOE-HQ`s extending the program until the Year 2001. AGTSR received the balance of funds for 1997 from DOE-FETC to cover the period June 13, 1997 to December 31, 1997 - the amount was for $2,367, 000 bringing the total to $4M for FY97. AGTSR provided a list of potential reviewers to DOE-HQ and DOE- FETC for SBIR proposals in the areas of sensors I controls and combustion. AGTSR participated on the ATS panel at the 1997 IGTI TurboExpo highlighting research collaborations within the AGTSR consortium. AGTSR displayed an exhibit booth at the 1997 IGTI TurboExpo showcasing their latest research results and program announcements. AGTSR distributed to the IRB and DOE two research reports from Clemson University`s film- cooling project. AGTSR distributed the proceedings (two volumes) from Heat Transfer Workshop II. AGTSR presented a paper at the 1997 IGTI TurboExpo on the status of its educational internship program with industry. AGTSR placed 17 interns at IRB company sites as part of the educational mission of the AGTSR consortium.

  15. Solar lease grant program. Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    1981-04-01

    Progress on a lease program for the installation of a solar water heater with no installation charge is reported. Information on the announcement of the program, the selection of participants, the contractural agreement, progress on installation of equipment, monitoring, and evaluation is summarized. The status of the budget concerned with the program is announced. Forms used for applications for the program and an announcement from Resource Alternatives for Cilco customers are presented.

  16. Technical progress and its factors in Russia’s economy

    Directory of Open Access Journals (Sweden)

    Simon György Jr.

    2010-01-01

    Full Text Available In this paper long-term growth in Russia’s economy is viewed in the context of technical progress, based on both neoclassical and endogenous theories. The dynamics of economic growth with some aspects of catch-up development are examined, as well as capital deepening. TFP is quantified in terms of both output and productivity increases to reveal the leading role of embodied technical progress in productivity growth. An endogenous growth model helped to discern three complex factors of technical progress in the Russian economy, to which at the macro level a factor related to natural wealth (oil and gas resources was added. This enabled the author to conclude that the most important macroeconomic factor of Russia’s technical progress in the half century from the early 1960s to the late 2000s was its immobile component. At the manufacturing level the situation was more complicated, as the initial leadership of creative technical progress was superseded by the dominance of the mobile factor. The collapse of the Soviet Union made the Russian economy more service-oriented and radically changed the conditions of economic modernization, in which technology transfer ensured by FDI began to play a more prominent part, particularly after the default of 1998.

  17. Fuel gas production from animal and agricultural residues and biomass. Quarterly coordination meeting, March 15-16, 1979, Tampa, Florida. Third quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Wise, D L; Ashare, E; Wentworth, R L

    1979-04-24

    The eleventh quarterly coordination meeting of the methane production group of the Fuels From Biomass Systems Branch, US Department of Energy was held at Tampa, Florida, March 15-16, 1979. Progress reports were presented by the contractors and a site visit was made to Kaplan Industries, Bartow, Florida to see the Hamilton Standard demonstration facility for digestion of environmental feedlot residue to methane. A meeting agenda, a list of attendees, and progress reports are presented.

  18. Co-sponsored second quarter progress review conference on district heating

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    A summary of the progress review conference on district heating and cooling systems is presented. The agenda and lists of speakers and attendees are presented. A history of district heating and some present needs and future policies are given and an excerpt from the National District Heating Program Strategy (DOE, March 1980) is included. Following the presentation, District Heating and Cooling Systems Program, by Alan M. Rubin, a fact sheet on DOE's Integrated Community Energy Systems Program and information from an oral presentation, District Heating and Cooling Systems for Communities Through Power Plant Retrofit Distribution Network, are given. The Second Quarterly Oral Report to the US DOE on the District Heating and Cooling Project in Detroit; the executive summary of the Piqua, Ohio District Heating and Cooling Demonstration Project; the Second Quarterly Report of the Moorehead, Minnesota District Heating Project; and the report from the Moorehead, Minnesota mayor on the Hot Water District Heating Project are presented.

  19. Final Technical Progress Report NANOSTRUCTURED MAGNETIC MATERIALS

    Energy Technology Data Exchange (ETDEWEB)

    Charles M. Falco

    2012-09-13

    This report describes progress made during the final phase of our DOE-funded program on Nanostructured Magnetic Materials. This period was quite productive, resulting in the submission of three papers and presentation of three talks at international conferences and three seminars at research institutions. Our DOE-funded research efforts were directed toward studies of magnetism at surfaces and interfaces in high-quality, well-characterized materials prepared by Molecular Beam Epitaxy (MBE) and sputtering. We have an exceptionally well-equipped laboratory for these studies, with: Thin film preparation equipment; Characterization equipment; Equipment to study magnetic properties of surfaces and ultra-thin magnetic films and interfaces in multi-layers and superlattices.

  20. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    This report summarizes geothermal technical assistance, R&D, and technology transfer activities of the Geo-Heat Center. It describes 95 contacts with parties during this period related to technical assistance with goethermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics, and resources. Research activities are summarized on geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include publication of a geothermal direct use Bulletin, dissemination of information, goethermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  1. Fossil-energy program. Quarterly progress report for June 30, 1983

    Energy Technology Data Exchange (ETDEWEB)

    McNeese, L.E.

    1983-08-01

    This quarterly report covers the progress made during the period March 31 through June 30 for the Oak Ridge National Laboratory research and development projects that are carried out in support of the increased utilization of coal and other fossil fuels as sources of clean energy. These projects are supported by various parts of DOE including Fossil Energy, Basic Energy Sciences, Office of Health and Environmental Research, Office of Environmental Compliance and Overview, the Electric Power Research Institute, and by the Tennessee Valley Authority and the EPA Office of Research and Development through inter-agency agreement with DOE.

  2. Technical Entrepreneurship and Technological Progress in Developing Countries.

    Science.gov (United States)

    Quevedo-Procel, Jose

    This paper describes the Mexican economic environment in terms of general economic conditions from the 1940s to the present, the role of science and technology in industrial progress, and the promotion and support of small companies. The technical entrepreneur is identified as the missing link that would play an important part in the technological…

  3. Plan and Design Meticulously and Promoting Technical Progress

    Institute of Scientific and Technical Information of China (English)

    Miao Chengwu

    1994-01-01

    @@ Plan and design is the key link in captial construction, and the soul of engineering construction. China Petroleum Planning & Engineering Institute (CPPEI) is one of the main undertakers for planning and designing of petroleum industry,the only leading multi-functional institute with the first class design certificate. Now it has been an organization under the China National Petroleum Corporation(CNPC)for making development strategy planning, project evaluations and technical consulting, drawing up project development plan and providing technical recommendations. It can complete plan and design for the oil and gas field facilities, pipeline construction,petroleum relinery and petro-chemical industry engineering at home and abroad. It is also a center of servicing for new technical development and scientific research. Since CPPEI was established in 1978,it has meticulously conducted on planning and designing for the technical progress of petroleum engineering.

  4. Reactor safety research programs. Quarterly progress report, January 1--March 31, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Romano, A. J. [comp.

    1978-04-01

    Progress is summarized in the following areas: (1) gas reactor safety evaluation, (2) THOR code development, (3) foreign code review, (4) SSC code development, (5) LMFBR and LWR safety experiments, (6) fast reactor safety code validation, (7) stress corrosion cracking of PWR steam generator tubing, and (8) technical coordination of structural integrity.

  5. Short Rotation Woody Crops Program. Quarterly progress report, March 1-May 31, 1985. [Sycamore, alders, black locust, larch, poplars, saltbush

    Energy Technology Data Exchange (ETDEWEB)

    Wright, L.L.; Perlack, R.D.; Wenzel, C.R.; Trimble, J.L.; Ranney, J.W.

    1985-08-01

    This report covers the progress of the Short Rotation Woody Crops Program (SRWCP) during the third quarter of fiscal year 1985. This report summarizes ORNL management activities, technical activities at ORNL and subcontract institutions, and the technology transfer that is occurring as a result of subcontractor and ORNL activities. Third-year results of a nutrient utilization study confirmed that there were no benefits to quarterly fertilization with urea nitrogen. Testing of one prototype short-rotation intensive culture harvester was conducted on a sycamore plantation on Scott Paper Company land in southern Alabama. Coppice yields of European black alder reported by Iowa State University indicate potential productivity of about 7.2 dry Mg . ha/sup -1/ . year/sup -1/ if the best trees are selected. Coppice yields were more than double first-rotation yields. About 31,000 black locust and larch trees were established in 12 genetic tests at 4 sites in Michigan. Seedling rotation productivity rates of 4-year-old hybrid poplar, based on harvest data, were reported by Pennsylvania State University. Rates varied from 4.8 dry Mg . ha/sup -1/ . year/sup -1/ to 10.7 dry Mg . ha/sup -1/ . year/sup -1/, depending on site, management strategy, and planting year. An efficient method for in vitro micropropagation of elite genotypes of fourwing saltbush was developed by Plant Resources Institute. A new study to evaluate yield/density relationships was established by the USDA Forest Service, Pacific Northwest Forest and Range Experiment Station. Dissertation research on the crown geometry of plantation-grown American sycamore was completed.

  6. Geothermal direct-heat utilization assistance. Quarterly progress report, January--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1993-03-30

    CHC (Geo-Heated Center) staff provided assistance to 103 requests from 26 states, and from Canada, Egypt, Mexico, China, Poland and Greece. A breakdown of the requests according to application include: space and district heating (19), geothermal heat pumps (24), greenhouses (10), aquaculture (4), industrial (4), equipment (3), resources (27), electric power (2) and other (20). Progress is reported on: (1) evaluation of lineshaft turbine pump problems, (2) pilot fruit drier and (3) geothermal district heating marketing tools and equipment investigation. Four presentations and two tours were conducted during the quarter, GHC Quarterly Bulletin Vol. 14, No. 4 was prepared, 14 volumes were added to the library and information was disseminated to 45 requests. Progress reports are on: (1) GHP Teleconference 93, (2) California Energy Buys Glass Mountain Prospect from Unocal and Makes Deal for Newberry Caldera, (3) New Power Plant Planned, (4) Vale to Get Power Plant, (5) BPA Approves Geothermal Project, (6) Update: San Bernardino Reservoir Study, (7) Twenty-nine Palms Geothermal Resources, (8) Geo-Ag Heat Center, Lake County, and (9) Update: Geothermal Wells at Alturas.

  7. GBRN/DOE Project: Dynamic enhanced recovery technologies. Quarterly technical report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.N.

    1994-04-15

    Global Basins Research Network will perform a field demonstration of their ``Dynamic Enhanced Recovery Technology`` to test the concept that the growth faults in EI-330 field are conduits through which producing reservoirs are charged and that enhanced production can be developed by producing directly from the fault zone. The site, operated by Penzoil, is located in 250 feet of water the productive depth intervals include 4000 to 9000 feet. Previous work, which incorporated pressure, temperature, fluid flow, heat flow, seismic, production, and well log data, indicated active fluid flow along fault zones. The field demonstration will be accomplished by drilling and production test of growth fault systems associated with the EI-330 field. The project utilizes advanced 3-D seismic analysis, geochemical studies, structural and stratigraphic reservoir characterization, reservoir simulation, and compact visualization systems. The quarterly progress reports contains accomplishments to date for the following tasks: Management start-up; database management; field and demonstration equipment; reservoir characterization, modeling; geochemistry; and data integration.

  8. National Institute for Petroleum and Energy Research quarterly technical report, January 1--March 31, 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-04-19

    Fuels research is discussed in the following areas: (1) Department of Analytical Methodology for Analysis of Heavy Crudes; and (2) thermochemistry and thermophysical properties of organic nitrogen-, and diheteroatom-containing compounds. This quarter for project (1), inspection analysis of five 1000{degree}F+ resids employed in the carbonization study were completed. Also, subfractionation of Cerro Negro neutrals fraction was carried out. Progress on Project 2 consisted of: a thermodynamic analysis for the key hydrogen-consuming steps in the hydrodenitrogenation (HDN) reaction network for quinoline; heat-capacity and enthalpy measurements were completed for the diheteroatom-containing compound, thianthrene. Following completion measurements on thianthrene, the heat capacity of the empty calorimeter was determined, and in another calorimeter, heat-capacity and enthalpy studies were started on benzoxazole. Methods to convert benzoxazole to its low-temperature form were developed, and measurements were completed between 80 and 240 K; and high-temperature heat capacities were determined for phenoxathin and carbazole. 1 ref., 14 figs., 11 tabs.

  9. Sonic enhanced ash agglomeration and sulfur capture. Technical progress report: January 1993--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This 15th Quarterly Technical Progress Report presents the results of work accomplished during the period January 4, 193 through March 28, 1993 under Contract No. DE-AC21-88MC26288 entitled {open_quotes}Sonic Enhanced Ash Agglomeration and Sulfur Capture.{close_quotes} The fundamental studies conducted by West Virginia University and Pennsylvania State University are provided in subsections of this report. Shakedown testing continued through this period resulting in a series of required modifications for the coal-feed system, coal injector, installation of a water-cooling jacket at the bottom of the agglomeration chamber, and finally, the installation of an additional flow sensor and rate meter. Coal-fired bimodal tests were initiated at the end of the period. The unit was run at 2 atm pressure for 3 hours with steady-state operation for 2 hours. Then, the pressure was increased to 3 atm with steady-state operation for 2 hours.

  10. Energy conservation via heat transfer enhancement. Quarterly progress report, January 1-March 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Bergles, A.E.; Junkhan, G.H.; Webb, R.L.

    1979-06-01

    This report for the first quarter of 1979 summarizes visits and contacts relative to the theory and practice of heat transfer enhancement. The Technical Literature File and Manufacturers' File were expanded, and the initial Patent Technology Information File was completed. Application studies on enhancement of waste heat recuperators and laminar internal flow heat transfer are described. A comprehensive bibliography on laminar flow enhancement is included. The Technology study on performance of internally finned tubes is complete. New data for the heat transfer and friction characteristics of internally finned tubes will be analyzed to develop rationally based correlations. An assessment of natural convection from rough surfaces was performed. Major effort was directed toward planning of the Research Workshop on Energy Conservation Through Enhanced Heat Transfer. The Workshop, scheduled for May 24 and May 25, 1979 in Chicago, will be co-sponsored by NSF.

  11. Swallowable Wireless Capsule Endoscopy: Progress and Technical Challenges

    Directory of Open Access Journals (Sweden)

    Guobing Pan

    2012-01-01

    Full Text Available Wireless capsule endoscopy (WCE offers a feasible noninvasive way to detect the whole gastrointestinal (GI tract and revolutionizes the diagnosis technology. However, compared with wired endoscopies, the limited working time, the low frame rate, and the low image resolution limit the wider application. The progress of this new technology is reviewed in this paper, and the evolution tendencies are analyzed to be high image resolution, high frame rate, and long working time. Unfortunately, the power supply of capsule endoscope (CE is the bottleneck. Wireless power transmission (WPT is the promising solution to this problem, but is also the technical challenge. Active CE is another tendency and will be the next geneion of the WCE. Nevertheless, it will not come true shortly, unless the practical locomotion mechanism of the active CE in GI tract is achieved. The locomotion mechanism is the other technical challenge, besides the challenge of WPT. The progress about the WPT and the active capsule technology is reviewed.

  12. Novel bimetallic dispersed catalysts for temperature-programmed coal liquefaction. Technical progress report, July--September 1996

    Energy Technology Data Exchange (ETDEWEB)

    Yoneyama, Yoshiharu; Wei, B.; Reddy, K.M.; Song, C.; Schobert, H.H.

    1997-01-01

    This quarterly report describes recent work on two related subjects: (1) effect of dispersed molybdenum catalyst precursor and the influence of water addition on C-O bond cleavage, aromatic hydrogenation and hydrodeoxygenation under coal liquefaction conditions, and (2) the effect of dispersed molybdenum catalyst precursor on the molecular weight reduction and desulfurization of petroleum resids related to coal/petroleum resids coprocessing. Technical progress on the C-O bond cleavage of 2,2{prime}-dinaphthyl ether and high temperature simulated distillation GC and HDS study on catalytic upgrading of atmospheric and vacuum resids.

  13. [National Institute for Petroleum and Energy Research] quarterly technical report, October 1--December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    Accomplishments for the past quarter are described for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and microbial technology.

  14. The Amarillo National Resource Center for Plutonium. Quarterly progress detailed report, 1 November 1996--31 January 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    Progress for this quarter is given for each of the following Center programs: (1) plutonium information resource; (2) advisory function (DOE and state support); (3) environmental, public health and safety; (3) communication, education, and training; and (4) nuclear and other material studies. Both summaries of the activities and detailed reports are included.

  15. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    This report is the quarterly progress report for July through September 1995 for work done by Tulane and Xavier Universities under DOE contract number DE-FG01-93-EW53023. Accomplishments for various tasks including administrative activities, collaborative cluster projects, education projects, initiation projects, coordinated instrumentation facility, and an investigators` retreat are detailed in the report.

  16. Solar thermal power systems. Annual technical progress report, FY 1979

    Energy Technology Data Exchange (ETDEWEB)

    Braun, Gerald W.

    1980-06-01

    The Solar Thermal Power Systems Program is the key element in the national effort to establish solar thermal conversion technologies within the major sectors of the national energy market. It provides for the development of concentrating mirror/lens heat collection and conversion technologies for both central and dispersed receiver applications to produce electricity, provide heat at its point of use in industrial processes, provide heat and electricity in combination for industrial, commercial, and residential needs, and ultimately, drive processes for production of liquid and gaseous fuels. This report is the second Annual Technical Progress Report for the Solar Thermal Power Systems Program and is structured according to the organization of the Solar Thermal Power Systems Program on September 30, 1979. Emphasis is on the technical progress of the projects rather than on activities and individual contractor efforts. Each project description indicates its place in the Solar Thermal Power Systems Program, a brief history, the significant achievements and real progress during FY 1979, also future project activities as well as anticipated significant achievements are forecast. (WHK)

  17. International Linear Collider-A Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Elsen, Eckhard; /DESY; Harrison, Mike; /Brookhaven; Hesla, Leah; /Fermilab; Ross, Marc; /Fermilab; Royole-Degieux, Perrine; /Paris, IN2P3; Takahashi, Rika; /KEK, Tsukuba; Walker, Nicholas; /DESY; Warmbein, Barbara; /DESY; Yamamoto, Akira; /KEK, Tsukuba; Yokoya, Kaoru; /KEK, Tsukuba; Zhang, Min; /Beijing, Inst. High Energy Phys.

    2011-11-04

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  18. Environmental Research Division technical progress report, January 1984-December 1985

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    Technical progress in the various research and assessment activities of Argonne National Laboratory's Environmental Research Division is reported for the period 1984 to 1985. Textual, graphic, and tabular information is used to briefly summarize (in separate chapters) the work of the Division's Atmospheric Physics, Environmental Effects Research, Environmental Impacts, Fundamental Molecular Physics and Chemistry, and Waste Management Programs. Information on professional qualifications, awards, and outstanding professional activities of staff members, as well as lists of publications, oral presentations, special events organized, and participants in educational programs, are provided in appendices at the end of each chapter.

  19. Fuel gas production from animal and agricultural residues and biomass. Quarterly coordination meeting, December 11-12, 1978, Denver, Colorado. Second Quarterly progress report

    Energy Technology Data Exchange (ETDEWEB)

    Wise, D L; Ashare, E; Wentworth, R L

    1979-01-05

    The tenth quarterly coordination meeting of the methane production group of the Fuels from Biomass Systems Branch, US Department of Energy was held at Denver, Colorado, December 11-12, 1978. Progress reports were presented by the contractors and a site visit was made to the Solar Energy Research Institute, Golden, Colorado. A meeting agenda, a list of attendees, and progress are presented. Report titles are: pipeline fuel gas from an environmental feedlot; operation of a 50,000 gallon anaerobic digester at the Monroe State Dairy Farm near Monroe, Washington; anaerobic fermentation of livestock and crop residues; anaerobic fermentation of agricultural residues - potential for improvement and implementation; heat treatment of organics for increasing anaerobic biodegradability; and biological conversion of biomass to methane. (DC)

  20. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 2 quarter 1 progress report.

    Energy Technology Data Exchange (ETDEWEB)

    Lottes, S.A.; Bojanowski, C.; Shen, J.; Xie, Z.; Zhai, Y. (Energy Systems); (Turner-Fairbank Highway Research Center)

    2012-04-09

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. The analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of October through

  1. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 2 quarter 2 progress report

    Energy Technology Data Exchange (ETDEWEB)

    Lottes, S.A.; Bojanowski, C.; Shen, J.; Xie, Z.; Zhai, Y. (Energy Systems); (Turner-Fairbank Highway Research Center)

    2012-06-28

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. The analysis methods employ well benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of January through

  2. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC year 1 quarter 4 progress report.

    Energy Technology Data Exchange (ETDEWEB)

    Lottes, S.A.; Kulak, R.F.; Bojanowski, C. (Energy Systems)

    2011-12-09

    under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of July through September 2011.

  3. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 1 quarter 3 progress report.

    Energy Technology Data Exchange (ETDEWEB)

    Lottes, S.A.; Kulak, R.F.; Bojanowski, C. (Energy Systems)

    2011-08-26

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. The analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project

  4. Thermal energy storage for building heating and cooling applications. Quarterly progress report, April--June 1976

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, H.W.; Kedl, R.J.

    1976-11-01

    This is the first in a series of quarterly progress reports covering activities at ORNL to develop thermal energy storage (TES) technology applicable to building heating and cooling. Studies to be carried out will emphasize latent heat storage in that sensible heat storage is held to be an essentially existing technology. Development of a time-dependent analytical model of a TES system charged with a phase-change material was started. A report on TES subsystems for application to solar energy sources is nearing completion. Studies into the physical chemistry of TES materials were initiated. Preliminary data were obtained on the melt-freeze cycle behavior and viscosities of sodium thiosulfate pentahydrate and a mixture of Glauber's salt and Borax; limited melt-freeze data were obtained on two paraffin waxes. A subcontract was signed with Monsanto Research Corporation for studies on form-stable crystalline polymer pellets for TES; subcontracts are being negotiated with four other organizations (Clemson University, Dow Chemical Company, Franklin Institute, and Suntek Research Associates). Review of 10 of 13 unsolicited proposals received was completed by the end of June 1976.

  5. Quarterly Performance/Technical Report of the National Marrow Donor Program

    Science.gov (United States)

    2011-01-28

    Activity: • This Task is closed. IID.1 Task 3: Expand Immuno- biology Research Period 3 Activity: The CIBMTR IBWC met monthly during the quarter...of Wisconsin BARDA Biomedical Advanced Research and Development Authority MDACC MD Anderson Cancer Center BBMT Biology of Blood and Marrow...Research OB Obstretician CIO Chief Information Officer OB/GYN Obstetrics & Gynecology CLIA Clinical Laboratory Improvement Amendment OCR /ICR

  6. AR and TD Fossil Energy Materials Program. Quarterly progress report for the period ending December 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    1982-04-01

    The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology. We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.

  7. Thermal energy storage technical progress report, April 1992--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    Olszewski, M.

    1993-05-01

    The Department of Energy (DOE) is supporting development of thermal energy storage (TES) as a means of efficiently coupling energy supplies to variable heating or cooling demands. Uses of TES include electrical demand-side management in buildings and industry, extending the utilization of renewable energy resources such as solar, and recovery of waste heat from periodic industrial processes. Technical progress to develop TES for specific diurnal and industrial applications under the Oak Ridge National Laboratory`s TES program from April 1992 to March 1993 is reported and covers research in the areas of low temperature sorption, thermal energy storage water heater, latent heat storage wallboard and latent/sensible heat regenerator technology development.

  8. Molecular biological enhancement of coal biodesulfurization. Quarterly technical report, September 1, 1993--November 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Kilbane, J.J. II [Institute of Gas Technology, Chicago, IL (United States)

    1993-12-31

    IGT has developed a microbial culture of Rhodococcus rhodochrous, designated as IGTS8, that is capable of specifically cleaving carbon-sulfur bonds in a range of organosulfur model compounds and is capable of removing organic sulfur from coal and petroleum without significantly sacrificing the calorific value of the fuel. Although IGTS8 possesses the ability to specifically remove organic sulfur from coal, a major research need is to develop improved strains of microorganisms that possess higher levels of desulfurization activity and therefore will permit more favorable biodesulfurization process conditions: faster rates, more complete removal, and smaller reactor size. strain improvement is the single most important aspect to the development of a practical coal biodesulfurization process and accordingly is the focus of research in this project. During this quarter the promoter probe vectors that were constructed last quarter were found to be unstable in E. coli. Fragments of R. rhodochrous IGTS8 chromosomal DNA were cloned into pRCAT3 and pRCM1 (previously described in final ICCI report 1993). Many derivatives of pRCM1 and pRCAT3 receiving inserts that regulated the expression of chloramphenicol resistance in Rhodococcus rhodochrous IGTS8 proved to be unstable in E. coli frequently yielding plasmids containing deletions. Stable inserts have been observed ranging from 100 bp to 2.0 kb that regulated expression in Rhodococcus rhodochrous IGTS8. Subtractive hybridization studies continue, several candidates have been isolated and are being confirmed for inducible promoters. Primer extension analysis of the Rhodococcus rhodochrous IGTS8 16S RNA promoter region was initiated this quarter.

  9. Regulatory and technical reports (abstract index journal): Compilation for third quarter 1994, July--September. Volume 19, Number 3

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-12-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issues by the U.S. Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, NUREG/CR-XXXX, and NUREG/IA-XXXX. These precede the following indexes: Secondary Report Number Index, Personal Author Index, Subject Index, NRC Originating Organization Index (Staff Reports), NRC Originating Organization Index (International Agreements), NRC Contract Sponsor Index (Contractor Reports) Contractor Index, International Organization Index, Licensed Facility Index. A detailed explanation of the entries precedes each index.

  10. Regulatory and technical reports (abstract index journal): Compilation for third quarter 1996 July--September. Volume 21, Number 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    This compilation consists of bibliographic data and abstracts for the formal regulatory and technical reports issued by the US Nuclear Regulatory Commission (NRC) Staff and its contractors. It is NRC`s intention to publish this compilation quarterly and to cumulate it annually. The main citations and abstracts in this compilation are listed in NUREG number order: NUREG-XXXX, NUREG/CP-XXXX, NUREG/CR-XXXX, and NUREG/IA-XXXX. These precede the following indexes: secondary report number index; personal author index; subject index; NRC originating organization index (staff reports); NRC originating organization index (international agreements); NRC contract sponsor index (contractor reports); contractor index; international organization index; and licensed facility index. A detailed explanation of the entries precedes each index.

  11. Molecular catalytic coal liquid conversion. Quarterly progress report, [January--March 1993

    Energy Technology Data Exchange (ETDEWEB)

    Stock, L.M.; Cheng, C.; Ettinger, M.

    1993-03-31

    Last quarter, substantial progress has been made in the two general tasks advanced in our research proposal. The first task consists of the development of molecular homogeneous catalysts that can be used in the hydrogenation of coal liquids and in coal conversion processes. The second task concerns the activation of dihydrogen by basic catalysts in homogeneous reaction systems. With regards to the first task, we have prepared two organometallic rhodium (1) catalysts. These are the dimer of dichloropentamethylcyclopentadienylrhodium, [RhCl{sub 2}(C{sub 5}Me{sub 5})], and the dimer of chloro(1,5-hexadiene)rhodium We have subsequently investigated the hydrogenation of various aromatic organic compounds using these organometallic reagents as catalysts. Results showed that both catalysts effected the hydrogenation of the aromatic portions of a wide range of organic compounds, including aromatic hydrocarbons and aromatic compounds containing the ether group, alkyl groups, amino and carbonyl groups. However, both compounds were totally ineffective in catalyzing the hydrogenation of sulfur-containing aromatic organic compounds. Nevertheless, both rhodium catalysts successfully catalyzed the hydrogenation of naphthalene even in the presence of the coal liquids. With regards to base-activated hydrogenation of organic compounds, we have found that hydroxide and alkoxide bases are capable of activating,dihydrogen, thereby leading to the hydrogenation of phenyl-substituted alkenes. More specifically, tetrabutylammonium hydroxide, potassium tert-butoxide and potassium phenoxide were successfully used to activate dihydrogen and induce the hydrogenation of trans-stilbene. Potassium tert-butoxide was found to be slightly more effective than the other two bases in accomplishing this chemistry.

  12. Muskrat population dynamics and vegetation utilization : A management plan : Quarterly progress report : April, May, June 1979

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Quarterly report on a study of muskrat population dynamics and vegetation utilization, being led by Utah State University for a doctorate dissertation. The study...

  13. High-temperature-turbine technology program. Phase II. Technology test and support studies. Technical progress report, April 1, 1979-June 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-07-01

    Work performed on the High-Temperature-Turbine Technology Program, Phase II-Technology Test and Support Studies during the period from 1 April 1979 through 30 June 1979 is summarized. Objectives of the program elements as well as technical progress and problems during this Phase II quarterly reporting period are presented. Planned progress during the next quarterly reporting period is also defined. Testing of the LP rig engine with hot gas stream particulates simulating operation on low Btu gas is described. Fabrication of components and preparation of facilities for future tests of the Turbine Spool Technology Rig are discussed together with analytical reviews. Preparation of the low Btu gas synthesizing facility is discussed. Supporting Materials and Process investigations are described.

  14. Products of motor burnout. Second quarterly technical report, October 1, 1994--December 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hawley-Fedder, R.

    1995-01-15

    The OSP (Operating Safety Procedure) required for performance of electrical arc testing of CFC replacement fluids was renewed. Electrical breakdown tests at one atmosphere pressure have been performed for R-22, R-134a, and R-125/R-143a (50:50 blend; R-507), and breakdown products identified. No differences in HCFC breakdown products are seen in the presence or absence of lubricant oils. The design of the high pressure-high temperature test stand has been finalized, and construction initiated during this quarter. Three motor stators and rotors were received from Tecumseh Products Company for use in motor burnout tests. A test plan for the motor breakdown tests is in preparation.

  15. Reversed-field pinch dynamics and transport studies. Quarterly progress report, third quarter, 20 October 1983-20 January 1984

    Energy Technology Data Exchange (ETDEWEB)

    Schnack, D.D.

    1984-03-20

    Progress in RFP dynamics and transport studies is described. A three-dimensional, incompressible MHD code has been developed, and is being checked against known results. It is computationally more efficient than the existing code, and will be used extensively if compressibility is determined to be unimportant. Post-processor codes to analyze data generated by the nonlinear code have been developed. Three-dimensional computer runs at low theta(=B/sub theta/(a)/) have found the development of a substantial stochastic core, with good flux surfaces being retained in the outer part of the discharge. Runs at high theta have shown complete stochasticity, with reappearance of outer flux surfaces as the modes saturate and relax. Anomalous maintenance of positive toroidal flux arising from a poloidal electric field at the field reversal surface induced by MHD fluctuations (dynamo) has been observed. These results have been documented in a publication. Statistical analysis of stochastic magnetic field regions to assess transport coefficients is underway. Analytic studies of the RFP dynamo are continuing. We are attempting to find steady state solutions with flow to the resistive MHD equations. Necessary conditions for the existance of the dynamo have been identified. A reduced model to simulate phenomena that occur on the relaxation time scale, such as F-theta current drive, has been derived, and a numerical algorithm formulated.

  16. 21st Century Locomotive Technology: Quarterly Technical Status Report 6 DOE/AL68284-TSR06

    Energy Technology Data Exchange (ETDEWEB)

    Lembit Salasoo; Jennifer Topinka; Paul K. Houpt

    2004-08-31

    Experimental work to map the performance of the High Pressure Common Rail (HPCR) system on a locomotive is in progress. The experimental trends agree with KIVA modeling predictions. Injection optimization is in progress. Electrically-assisted turbocharger modeling was used to study passenger locomotive performance improvements. Energy storage cycling life testing began, and an improved battery state algorithm was determined. The hybrid locomotive energy storage was prepared for energy management system algorithm testing. Progress in reliable methods for computing optimal driving plans, and methods to reduce the complexity of the necessary optimization are reported.

  17. National Institute for Petroleum and Energy Research quarterly technical report, April 1--June 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Progress reports are presented for: chemical flooding--supporting research; gas displacement-supporting research; thermal recovery-supporting research; geoscience technology; resource assessment technology; and microbial technology. (AT)

  18. Modern problems of technical progress and methodological support in medicine

    Science.gov (United States)

    Novyc'kyy, Victor V.; Lushchyk, Ulyana B.

    2001-06-01

    A rapid development of modern computer technologies gave a powerful incentive to technical progress as a whole and to medical equipment in particular. A range of medical diagnostic computer-based systems has recently appeared. There are various fields these techniques are used in: roentgenology, ultrasound diagnostic, neurophysiology, angiology etc. The advantages of the use of computer interface are undoubted: it gives possibility to enhance the functioning of the system itself, speed up all technological processes, carry out a reliable and easy archivation and exchange the information obtained. But the most important advantage of using PC in diagnostic system lies in an unlimited freedom of use mathematical algorithms and flexible mathematical models for processing information obtained. On the other hand, the absence of clinical techniques for interpretation of the data obtained is an obstacle to the use of software at its full potential. As a result, a close connection of a scientific development of hardware with high-informative techniques for clinical interpretation of the instrumental data obtained has become topical as never before. We see an optimal solution in introducing the interpretation patterns in conjunction with purely numerical computations into mathematical simulations.

  19. Molecular biological enhancement of coal biodesulfurization. [Quarterly] technical report, December 1, 1993--February 28, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Kilbane, J.J. II [Institute of Gas Technology, Chicago, IL (United States)

    1994-06-01

    IGT has developed a microbial culture of Rhodococcus rhodochrous, IGTS8, that is capable of specifically cleaving carbon-sulfur bonds in a range of organosulfur model compounds and is capable of removing organic sulfur from coal and petroleum. Although IGTS8 possesses the ability to specifically remove organic sulfur from coal, a major research need is to develop improved strain`s of microorganisms that possess higher levels of desulfurization activity and therefore wall permit more favorable biodesulfurization process conditions: faster rates, mare complete removal, and smaller reactor size. Strain improvement is the single most important aspect to the development of a practical coal biodesulfurization process and accordingly is the focus of research in this project. Several possible strong promoters have been isolated and are in the process of being analyzed. When these promoters have been characterized for inducibility, strength, transcriptional start sites and other physical properties, they will be placed in front of the desulfurization genes and expression will be monitored. Improved promoter probe vectors have been constructed, allowing a conclusive screen of all putative Rhodococcus promoters. With the improved methodologies in the handling of Rhodococcus RNA, we have begun to gauge promoter expression using Northern blots. During this quarter we have constructed and successfully used a promoter probe vector using the {beta}-galactosidane gene from E. coli. A chromosomal promoter library was constructed upstream from the {beta}-galactosidase gene. Over 200 colonies were isolated that yielded {beta}-galactosidase activity.

  20. National Institute for Petroleum and Energy Research quarterly technical report, January 1--March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    Accomplishments for the past quarter are briefly described for the following tasks: chemical flooding -- supporting research; gas displacement -- supporting research; thermal recovery -- supporting research; geoscience technology; resource assessment technology; and microbial technology. Chemical flooding covers: surfactant flooding methods; development of improved alkaline flooding methods; mobility control and sweep improvement in chemical flooding; and surfactant-enhanced alkaline flooding field project. Gas displacement covers: gas flooding performance prediction improvement; and mobility control, profile modification and sweep improvement in gas flooding. Thermal recovery includes: thermal processes for light oil recovery; thermal processes for heavy oil recovery; and feasibility study of heavy oil recovery in the mid-continent region -- Oklahoma, Kansas, and Missouri; simulation analysis of steam-foam projects; and field application of foams for oil production symposium. Geoscience technology covers: three-phase relative permeability; and imaging techniques applied to the study of fluids in porous media. Resource assessment technology includes: reservoir assessment and characterization; TORIS research support; upgrade the BPO crude oil analysis data base; and compilation and analysis of outcrop data from the Muddy and Almond Formations. Microbial technology covers development of improved microbial flooding methods; and microbial-enhanced waterflooding field project.

  1. 21st Century Locomotive Technology: Quarterly Technical Status Report 5 DOE/AL68284-TSR05

    Energy Technology Data Exchange (ETDEWEB)

    Lembit Salasoo; Jennifer Topinka; Paul Houpt

    2004-05-07

    The integration of the common rail injection facility with the single cylinder test facility is in progress. Injection modeling parameters wereimproved. Turbocharger experimental data was analyzed and the turbocharger inspected after full load testing. Automatic seal coat spray techniques were developed and several material compositions were tested as coupons and on representative parts. A downselect was made from hybrid energy storage vendor studies. Further development of battery state algorithms was done, and a test plan developed for locomotive demonstration of advanced energy management algorithms. Trip optimization software platform was integrated and baseline validation is in progress. Hybrid energy storage modules have been integrated into the system model.

  2. Physical protection of nuclear facilities. Quarterly progress report, January--March 1977

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, L.D. (ed.)

    1977-07-01

    The physical protection of nuclear facilities program consists of four major areas--evaluation methodology development, path generation/selection methodology, facility characterization, and component functional performance characterization. Activities in each of these areas for the second quarter of FY 77 are summarized.

  3. Thermal energy storage subsystems (a collection of quarterly reports)

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    Five quarterly reports are presented, covering the progress made in the development, fabrication, and delivery of three Thermal Energy Storage Subsystems. The design, development, and progress toward the delivery of three subsystems are discussed. The subsystem uses a salt hydrate mixture for thermal energy storage. Included are the program schedules, technical data, and other program activities from October 1, 1976 through December 31, 1977.

  4. Preliminary evaluation of resinite recovery from Illinois coal. [Quarterly] technical report, September 1--November 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Crelling, J.C. [Southern Illinois Univ., Carbondale, IL (United States). Dept. of Geology

    1994-12-31

    Resinite is a naturally occurring substance found in coal and derived from original plant resins. It is ubiquitous in North American coals. It makes up one to four percent by volume of most Illinois coals. It has been commercially exploited in the western USA for use in adhesives, varnishes and thermal setting inks. The overall objective of this project is to compare the properties of the resinite contained in Illinois Basin coals to resinite being commercially exploited in the western United States, and to recover the resinite from Illinois coals by microbubble column floatation techniques. The significance of this study is that it has the potential to show the way to recover a valuable chemical, resinite, from coal using only physical processing techniques. The value of the resinite at $1.00/kg or $0.50/lb makes it about fifty times more valuable than steam coal. The removal of resinite from coal does not decrease the value of the remaining coal in any way. The unique aspects are that: (1) it is the first examination of the resinite recovery potential of Illinois coal, (2) it integrates the latest characterization techniques such as density Gradient centrifugation, microspectrofluorometry, and gas chromatography- mass spectrometry, and (3) it uses microbubble column flotation to determine the resinite recovery potential. During this quarter samples were obtained, information from both the databases of both the Illinois State Geological Survey (ISGS) and the Pennsylvania State University (PSU) was obtained and evaluated, and EBCSP samples from the Herrin No. 6, the Springfield No. 5 and the Colchester No. 2 seams were analyzed petrographically and the resinites in these samples were characterized by fluorescence spectral analysis.

  5. Composite quarterly technical report long-term high-level-waste technology, October-December 1981

    Energy Technology Data Exchange (ETDEWEB)

    Cornman, W.R. (comp.)

    1982-06-01

    This document summarizes work performed at participating sites on the immobilization of high-level wastes from the chemical reprocessing of reactor fuels. The plan is to develop waste form alternatives for each of the three DOE sites (SRP, ICPP, and Hanford). Progress is reported in the following areas: waste preparation; fixation in glass, concrete, tailored ceramics, and coated particles; process and equipment development; and final handling. 12 figures, 19 tables. (DLC)

  6. Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 34, quarter ending March 31, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Linville, B. (ed.)

    1983-07-01

    Progress achieved for the quarter ending March 1983 are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; and thermal/heavy oil. In addition, progress reports are presented for: resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; oil recovered by gravity mining; improved drilling technology; and general supporting research. (ATT)

  7. Nuclear-powered artificial heart prototype system development program. Quarterly progress report, July 1, 1976--September 30, 1976

    Energy Technology Data Exchange (ETDEWEB)

    1976-01-01

    Technical progress and accomplishments on the active tasks are reported. The tasks include: 35-thermal insulation and thermal protection; 36-thermal converter; 37-flexible shaft, bearing and lubricant; 38-thermal and hydraulic research; 39-system integration and interfacing; 40-IVBM system performance testing; 41-IVBM system fabrication; 42-Added IVBM blood pumps fabrication; 43-IVBM system life testing; and 46-quality assurance activities. (TFD)

  8. Establishing the SECME Model in the District of Columbia. Quarterly report, September 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    Technical progress and Federal Cash Transaction reports are presented for the first quarter. The work has been valuable in providing opportunities for greater academic achievement in mathematics and science for minority students in the District of Columbia.

  9. Advanced research and technology development fossil energy materials program. Quarterly progress report for the period ending September 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Bradley, R.A. (comp.)

    1981-12-01

    This is the fourth combined quarterly progress report for those projects that are part of the Advanced Research and Technology Development Fossil Energy Materials Program. The objective is to conduct a program of research and development on materials for fossil energy applications with a focus on the longer-term and generic needs of the various fossil fuel technologies. The program includes research aimed toward a better understanding of materials behavior in fossil energy environments and the development of new materials capable of substantial enhancement of plant operations and reliability. Work performed on the program generally falls into the Applied Research and Exploratory Development categories as defined in the DOE Technology Base Review, although basic research and engineering development are also conducted. A substantial portion of the work on the AR and TD Fossil Energy Materials Program is performed by participating cntractor organizations. All subcontractor work is monitored by Program staff members at ORNL and Argonne National Laboratory. This report is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1981 in which projects are organized according to fossil energy technologies. We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program.

  10. Electric and hybrid vehicle program; Site Operator Program. Quarterly progress report, January--March 1992 (Second quarter of fiscal year 1992)

    Energy Technology Data Exchange (ETDEWEB)

    Warren, J.F.

    1992-05-01

    Activities during the second quarter included the second meeting of the Site Operators in Phoenix, AZ in late April. The meeting was held in conjunction with the Solar and Electric 500 Race activities. Delivery of vehicles ordered previously has begun, although two of the operators are experiencing some delays in receiving their vehicles. Public demonstration activities continue, with an apparent increasing level of awareness and interest being displayed by the public. Initial problems with the Site Operator Database have been corrected and revised copies of the program have been supplied to the Program participants. Operating and Maintenance data is being supplied and submitted to INEL on a monthly basis. Interest in the Site Operator Program is being reflected in requests for information from several organizations from across the country, representing a wide diversity of interests. These organizations have been referred to existing Site Operators with the explanation that the program will not be adding new participants, but that most of the existing organizations are willing to work with other groups. The exception to this was the addition of Potomac Electric Power Company (PEPCO) to the program. PEPCO has been awarded a subcontract to operate and maintain the DOE owned G-Van and Escort located in Washington, DC. They will provide data on these vehicles, as well as a Solectria Force which PEPCO has purchased. The Task Force intends to be actively involved in the infrastructure development in a wide range of areas. These include, among others, personnel development, safety, charging, and servicing. Work continues in these areas. York Technical College (YORK) has completed the draft outline for the EV Technician course. This is being circulated to organizations around the country for comments. Kansas State University (KSU) is working with a private sector company to develop a energy dispensing meter for opportunity charging in public areas.

  11. Enforcement actions: Significant actions resolved; Quarterly progress report, October--December 1993: Volume 12, No. 4

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  12. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1994--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This paper is a third quarter 1994 report of activities of the Geo-Heat Center of Oregon Institute of Technology. It describes contacts with parties during this period related to assistance with geothermal direct heat applications. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources, and equipment. Research is also being conducted on failures of vertical lineshaft turbines in geothermal wells.

  13. Waste Management Program. Technical progress report, October-December 1982

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-07-01

    This quarterly report provides current information on operations and development programs for the management of radioactive wastes from operation of the Savannah River Plant and offplant participants. The studies on environmental and safety assessments, in situ storage or disposal, waste from development and characterization, process and equipment development, and low-level waste management are a part of the Long-Term Waste Management Technology Program. The following studies are reported for the SR Interim Waste Operations Program: surveillance and maintenance, waste concentration, low-level effluent waste, tank replacement/waste transfer, and solid waste storage and related activities.

  14. Coolside waste management research. Quarterly technical report, April 1--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    This report consists of 3 monthly progress reports. The first represents a summary of results from mineralogical studies of the field lysimeter samples. This part of the project is an ongoing task to understand the long term mineralogical reactions that occur in the lysimeters as a function of static loading (compaction) and moisture content. The data is congruent with results obtained from geotechnical characterization of pre-aged and non-aged Coolside samples with and without surcharge. The investigations are expected to aid in the understanding of the processes that control permeability and leaching potential of the materials and to produce sufficient information on the physical and chemical nature of Coolside waste to design and construct physically stable and environmentally safe landfills. The capacity of various FGD wastes to absorb CO{sub 2} has been recently investigated with the results summarized in the second monthly. The potential usage is for the removal of CO{sub 2} from multi-component gas streams, in particular, natural-gas streams. The third comprises results from ongoing geotechnical testing. The results are concurrent with mineralogical findings that suggest that ettringite, gypsum and calcium-alumino-silicate hydrate phases proceed to form within the aging materials. In specimens with higher degrees of static loading, minerals are forced to grow within available pore space and fractures, which causes less swell. This report also summarizes results from a study of the effects of Coolside leachate on natural clay liners.

  15. Cool pool development. Quarterly technical report No. 1, April-June 1979

    Energy Technology Data Exchange (ETDEWEB)

    Crowther, K.

    1979-10-15

    The Cool Pool is a passive cooling system consisting of a shaded, evaporating roof pond which thermosiphons cool water into water-filled, metal columns (culvert pipes) located within the building living space. The water in the roof pond is cooled by evaporation, convection and radiation. Because the water in the pool and downcomer is colder and denser than the water in the column a pressure difference is created and the cold water flows from the pool, through the downcomer and into the bottom of the column. The warm column water rises and flows through a connecting pipe into the pool. It is then cooled and the cycle repeats itself. The system requires no pumps. The water column absorbs heat from the building interior primarily by convection and radiation. Since the column is radiating at a significantly lower temperature than the interior walls it plays a double role in human comfort. Not only does it cool the air by convection but it provides a heat sink to which people can radiate. Since thermal radiation is important to the cooling of people, the cold water column contributes substantially to their feelings of comfort. Research on the Cool Pool system includes the following major tasks: control of biological organisms and debris in the roof pond and water cylinders; development of a heat exchanger; experimental investigation of the system's thermal performance; and development of a predictive computer simulation of the Cool Pool. Progress in these tasks is reported.

  16. Physical protection of nuclear facilities. Quarterly progress report, July--September 1978. [PWR; BWR

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, L.D. (ed.)

    1979-01-01

    Major activities during the fourth quarter of FY78 included (1) the vital area analysis of operational reactors and characterization of the Standardized Nuclear Unit Power Plant System (SNUPPS), (2) the algorithm development of a new pathfinding computer code, (3) the completion of contractor-supported work for the component generic data base, (4) the refinement of tests related to human parameters modeling, and (5) the addition of improvements to and demonstration of the Safeguards Automated Facility Evaluation (SAFE), Safeguards Network Analysis Procedure (SNAP), and Fixed-Site Neutralization Model (FSNM) methodologies.

  17. Enforcement actions: Significant actions resolved material licensees. Quarterly progress report, April 1995--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April-June 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  18. Enforcement actions: Significant actions resolved. Quarterly progress report, April--June 1993: Volume 12, No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1993) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  19. Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3

    Energy Technology Data Exchange (ETDEWEB)

    Ulm, Franz-Josef

    2000-03-31

    OAK-B135 Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3(NOTE: Part II A item 1 indicates ''PAPER'', but a report is attached electronically)

  20. Catalytic conversion of light alkanes. Quarterly progress report, April 1--June 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Lyons, J.E.

    1992-06-30

    The second Quarterly Report of 1992 on the Catalytic Conversion of Light Alkanes reviews the work done between April 1, 1992 and June 31, 1992 on the Cooperative Agreement. The mission of this work is to devise a new catalyst which can be used in a simple economic process to convert the light alkanes in natural gas to oxygenate products that can either be used as clean-burning, high octane liquid fuels, as fuel components or as precursors to liquid hydrocarbon uwspomdon fuel. During the past quarter we have continued to design, prepare, characterize and test novel catalysts for the mild selective reaction of light hydrocarbons with air or oxygen to produce alcohols directly. These catalysts are designed to form active metal oxo (MO) species and to be uniquely active for the homolytic cleavage of the carbon-hydrogen bonds in light alkanes producing intermediates which can form alcohols. We continue to investigate three molecular environments for the active catalytic species that we are trying to generate: electron-deficient macrocycles (PHASE I), polyoxometallates (PHASE II), and regular oxidic lattices including zeolites and related structures as well as other molecular surface structures having metal oxo groups (PHASE I).

  1. Verification of Steelmaking Slags Iron Content Final Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    J.Y. Hwang

    2006-10-04

    The steel industry in the United States generates about 30 million tons of by-products each year, including 6 million tons of desulfurization and BOF/BOP slag. The recycling of BF (blast furnace) slag has made significant progress in past years with much of the material being utilized as construction aggregate and in cementitious applications. However, the recycling of desulfurization and BOF/BOP slags still faces many technical, economic, and environmental challenges. Previous efforts have focused on in-plant recycling of the by-products, achieving only limited success. As a result, large amounts of by-products of various qualities have been stockpiled at steel mills or disposed into landfills. After more than 50 years of stockpiling and landfilling, available mill site space has diminished and environmental constraints have increased. The prospect of conventionally landfilling of the material is a high cost option, a waste of true national resources, and an eternal material liability issue. The research effort has demonstrated that major inroads have been made in establishing the viability of recycling and reuse of the steelmaking slags. The research identified key components in the slags, developed technologies to separate the iron units and produce marketable products from the separation processes. Three products are generated from the technology developed in this research, including a high grade iron product containing about 90%Fe, a medium grade iron product containing about 60% Fe, and a low grade iron product containing less than 10% Fe. The high grade iron product contains primarily metallic iron and can be marketed as a replacement of pig iron or DRI (Direct Reduced Iron) for steel mills. The medium grade iron product contains both iron oxide and metallic iron and can be utilized as a substitute for the iron ore in the blast furnace. The low grade iron product is rich in calcium, magnesium and iron oxides and silicates. It has a sufficient lime value and

  2. Verification of Steelmaking Slags Iron Content Final Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    J.Y. Hwang

    2006-10-04

    The steel industry in the United States generates about 30 million tons of by-products each year, including 6 million tons of desulfurization and BOF/BOP slag. The recycling of BF (blast furnace) slag has made significant progress in past years with much of the material being utilized as construction aggregate and in cementitious applications. However, the recycling of desulfurization and BOF/BOP slags still faces many technical, economic, and environmental challenges. Previous efforts have focused on in-plant recycling of the by-products, achieving only limited success. As a result, large amounts of by-products of various qualities have been stockpiled at steel mills or disposed into landfills. After more than 50 years of stockpiling and landfilling, available mill site space has diminished and environmental constraints have increased. The prospect of conventionally landfilling of the material is a high cost option, a waste of true national resources, and an eternal material liability issue. The research effort has demonstrated that major inroads have been made in establishing the viability of recycling and reuse of the steelmaking slags. The research identified key components in the slags, developed technologies to separate the iron units and produce marketable products from the separation processes. Three products are generated from the technology developed in this research, including a high grade iron product containing about 90%Fe, a medium grade iron product containing about 60% Fe, and a low grade iron product containing less than 10% Fe. The high grade iron product contains primarily metallic iron and can be marketed as a replacement of pig iron or DRI (Direct Reduced Iron) for steel mills. The medium grade iron product contains both iron oxide and metallic iron and can be utilized as a substitute for the iron ore in the blast furnace. The low grade iron product is rich in calcium, magnesium and iron oxides and silicates. It has a sufficient lime value and

  3. Advanced gas turbine systems research. Technical quarterly progress report, October 1--December 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Major accomplishments by AGTSR during this reporting period are highlighted and then amplified in later sections of this report. Main areas of research are combustion, heat transfer, and materials. Gas turbines are used for power generation by utilities and industry and for propulsion.

  4. International Power Institute`s quarterly technical progress report, July--September 1998

    Energy Technology Data Exchange (ETDEWEB)

    Coles, J.E.

    1998-10-30

    The International Power Institute (IPI) at Morehouse College has organized a team to design and create a Short Term Training Program for ESKOM Union Leaders which will last four weeks and take place at a location in South Africa to be designated by ESKOM. This proposal envisions a group of no more than 25 union leaders to be trained at the same time but the program could be expanded to accommodate up to 40 trainees. The program is designed around interactive training with lectures followed by discussion, case studies, trainee work groups, homework assignments and two field study visits. Also, the program is designed to have a number of ESKOM management people join the course for one day in the second week and one day at the end, in each case after a half day of preparation in separate sessions from the union leaders, to share with the trainees expectations and, at the end of the program, their course experiences. In addition, IPI has prepared a follow on proposal for a Long Term Training Program. This LT program is specified in less detail but can be expanded based on future discussions with ESKOM management. The training program is designed with the following objectives: determine and identify the most pressing problems facing ESKOM Union Leadership in their relationship with management; instill in the union leadership a heightened sense of purpose and willingness to take ownership of a process that will increase effective outcomes of meaningful, good faith bargaining; develop skills and experience leading to improved union administration; enhance realistic expectations and improve process knowledge to facilitate future labor negotiations and grievance proceedings; and provide participants with enhanced skills and knowledge to develop and/or strengthen a functioning, democratic work culture and structure internal to the union.

  5. Bench scale testing of micronized magnetite beneficiation. Quarterly technical progress report 4, October--December, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Anast, K.

    1994-01-25

    This project is aimed at development of a process that, by using ultra fine magnetite suspension, would expand the application of heavy media separation technology to processing fine, {minus}28 mesh coals. These coal fines, produced during coal mining and crushing, are separated in the conventional coal preparation plant and generally impounded in a tailings pond. Development of an economic process for processing these fines into marketable product will expand the utilization of coal for power production in an environmentally acceptable and economically viable way. This process has been successfully researched at PETC but has not been studied on a continuous bench-scale unit, which is a necessary step towards commercial development of this promising technology. The goal of the program is to investigate the technology in a continuous circuit at a reasonable scale to provide a design basis for larger plants and a commercial feasibility data.

  6. Responsive copolymers for enhanced petroleum recovery. Quarterly technical progress report, September 22, 1993--December 22, 1993

    Energy Technology Data Exchange (ETDEWEB)

    McCormick, C.; Hester, R.

    1993-12-31

    Synthetic efforts have focused on the development of ionically modified polymers based on monomers which contain an acrylamido functionality. The monomers may possess either cationic or anionic functionality which, depending on the pH of the polymer solution, may either be ionically charged or neutral. Thus, by adjusting the pH, the degree of ionization of the polymer may be controlled which will in turn influence the rheological behavior. Previous research in our laboratories has revealed that this behavior allows the selective synthesis of polymers operative over a wide range of conditions. This section describes the synthesis and solution behavior of cationic polyelectrolytes based on copolymers of acrylamide (AM) and 2-acrylamido-2-methylpropanetrimethylammonium chloride (AMPTAC), the ATAM series, as well as ampholytic terpolymers of acrylamide (AM), sodium 3-acrylamido-3-methylbutanoate (NaAMB), and 2-acrylamido-2-methylpropanetrimethylammonium chloride (AMPTAC), the ATABAM series. Monomers used in the ATAM and ATABAM series are shown.

  7. Enhanced catalysis by solvent improvement. Quarterly technical progress report, 1 April-30 June 1983

    Energy Technology Data Exchange (ETDEWEB)

    Garg, D.; Miller, R.N.; Givens, E.N.; Tarrer, A.R.; Guin, J.A.; Curtis, C.W.

    1983-11-01

    This report describes the results from liquefaction solvent modification, coal liquefaction with original and modified solvents, catalyst selection, coal pretreatment, and pretreatment followed by liquefaction experiments. The effect of liquefaction reaction conditions on product distribution is also covered in this report. Significant removal of nitrogen compounds from coal-derived liquefaction solvent was obtained by treating it with anhydrous hydrochloric acid or silica gel. The removal of nitrogen compounds with HCl or silica gel was also accompanied by 25 to 40% removal of oxygen compounds. Treating liquefaction solvent with aqueous NaOH or zeolite removed significant amounts of phenolic compounds. Oxygen removal was also accompanied by a partial removal of nitrogen compounds. Sequential treatment of coal-derived liquefaction solvent with HCl followed by silica gel or NaOH followed by HCl resulted in complete removal of nitrogen compounds. Liquefying coals in the presence of coal-derived liquefaction solvents modified by the removal of nitrogen or oxygen compounds or both significantly increased the oil yield in the absence of catalyst. The overall coal conversion, however, decreased only slightly with these treated solvents. A significant increase in the oil yield was also noted during catalytic liquefaction with the pretreated solvents. The overall coal conversion also increased during catalytic liquefaction of coal. At a concentration level of 250 ppM metal based on coal molybdenum catalyst was more active than nickel. At this level the activity of molybdenum was also higher than that noted with 1 wt% iron or zinc. Combination of metals such as iron and molybdenum or zinc and molybdenum yielded significantly higher oil yield compared to individual metals alone. 1 ref., 2 figs., 28 tabs.

  8. HAMS (Hypoxia, Monitoring, and Mitigation System) II Quarterly Progress Report (Technical and Financial)

    Science.gov (United States)

    2015-04-10

    three optional task: 1. Initial Prototypes 2. Design and Development Evolution 3. Production Ready HW/SW (Option) 4. Preliminary Human Testing of...Concept Definition Initial enclosure concepts were designed and 3D printed to facilitate size and layout of the electronic components. Refinement and...Milestones FY 2017 CY 2016 CY 2017 O N D J F M A M J J A S 2. Design and Development Evolution 3. (Option) Production Ready HW

  9. Amarillo National Resource Center for Plutonium quarterly technical progress report, August 1--October 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-01

    This paper describes activities of the Center under the following topical sections: Electronic resource library; Environmental restoration and protection; Health and safety; Waste management; Communication program; Education program; Training; Analytical development; Materials science; Plutonium processing and handling; and Storage.

  10. Bench scale testing of micronized magnetite beneficiation. Quarterly technical progress report 3, July--September, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Anast, K.

    1993-10-29

    This project is aimed at development of a process that, by using ultra fine magnetite suspension, would expand the application of heavy media separation technology to processing fine, {minus}28 mesh coals. These coal fines, produced during coal mining and crushing, are separated in the conventional coal preparation plant and generally impounded in a tailings pond. Development of an economic process for processing these fines into marketable product will expand the utilization of coal for power production in an environmentally acceptable and economically viable way. This process has been successfully researched at PETC but has not been studied on a continuous bench-scale unit, which is a necessary step towards commercial development of this promising technology. The goal of the program is to investigate the technology in a continuous circuit at a reasonable scale to provide a design basis for larger plants and a commercial feasibility data.

  11. Liquid fossil-fuel technology. Quarterly technical progress report, April-June 1982

    Energy Technology Data Exchange (ETDEWEB)

    Linville, B. (ed.)

    1982-10-01

    This report primarily covers in-house oil, gas, and synfuel research and lists the contracted research. The report is broken into the following areas: liquid fossil fuel cycle, extraction, processing, utilization, and project integration and technology transfer. BETC publications are listed. (DLC)

  12. Coal liquefaction process streams characterization and evaluation. Quarterly technical progress report, January 1--March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1993-12-01

    Process oil samples from HRI Catalytic Two-Stage Liquefaction (CTSL) Bench Unit Run CC-16 (227-76) were analyzed to provide information on process performance. Run CC-16 was operated in December 1992 with Burning Star 2 Mine (Illinois 6 seam) coal to test and validate Akzo EXP-AO-60 Ni/Mo catalyst (1/16 in. extrudate). Results were compared with those of four previous HRI CTSL bench unit runs made with Ni/Mo catalysts. Major conclusions from this work are summarized. (1) Akzo EXP-AO-60 gave process oil characteristics in Run CC-16 similar to those of other Ni/Mo catalysts tested in Runs I-13, I-16, I-17, and I-18 (by our analytical and empirical test methods). No distinct performance advantage for any of the catalysts emerges from the process oil characteristics and plant performance. Thus, for commercial coal liquefaction, a number of equivalent catalysts are available from competitive commercial sources. The similarity of run performance and process oil characteristics indicates consistent performance of HRI`s bench unit operations over a period of several years; (2) Dominant effects on process oil properties in Run CC-16 were catalyst age and higher temperature operation in Periods 10--13 (Condition 2). Properties affected were the aromaticities and phenolic -OH concentrations of most streams and the asphaltene and preasphaltene concentrations of the pressure-filter liquid (PFL) 850{degrees}F{sup +} resid. The trends reflect decreasing hydrogenation and defunctionalization of the process streams with increasing catalyst age. Operation at higher temperature conditions seems to have partially offset the effects of catalyst age.

  13. Developments of advanced hot-gas desulfurization sorbents. Quarterly technical progress report, April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    Jothimurugesan, K.; Adeyiga, A.A.; Gangwal, S.K.

    1995-07-01

    The objectives of this project are to develop hot-gas cleanup sorbents for relatively lower temperature application, with emphasis on the temperature range from 343-538{degrees}C. The candidate sorbents include highly dispersed mixed metal oxides of zinc, iron, copper, cobalt and molybdenum. The specific objective in the successful preparation of H{sub 2}S absorbents will be to generate as high and as stable a surface area as possible, in order to develop suitable sorbent, that are sufficiently reactive and regenerable at the relatively lower temperatures of interest in this work. A number of formulations will be prepared and screened for testing in a 1/2-inch fixed bed reactor at high pressure (1 to 20 atm) and high temperatures using simulated coal-derived fuel-gases. Screening criteria will include, chemical reactivity, stability, and regenerability over the temperature range of 343{degrees}C (650{degrees}F) to 538{degrees}C (1000{degrees}F). Each formulation will be tested for up to 5 cycles of absorption and regeneration. To prevent sulfation, catalyst additives will be investigated, which would promote a lower ignition of the regeneration. Selected superior formulation will be tested for long term (up to least 30 cycles) durability and chemical reactivity in the reactor.

  14. Coal liquefaction process streams characterization and evaluation. Quarterly technical progress report, October 1--December 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Robbins, G.A.; Brandes, S.D.; Winschel, R.A.; Burke, F.P.

    1992-03-01

    CONSOL R&D is conducting a three-year program to characterize process and product streams from direct coal liquefaction process development projects. The program objectives are two-fold: (1) to obtain and provide appropriate samples of coal liquids for the evaluation of analytical methodology, and (2) to support ongoing DOE-sponsored coal liquefaction process development efforts. The two broad objectives have considerable overlap and together serve to provide a bridge between process development and analytical chemistry.

  15. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, February 1, 1998--April 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    Activities from the Amarillo National Resource Center for Plutonium are described. Areas of work include materials science of nuclear and explosive materials, plutonium processing and handling, robotics, and storage.

  16. Decontamination systems information and research program. Quarterly technical progress report, October 1--December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    It is estimated that over 3700 hazardous waste sites are under the jurisdiction of the Department of Energy (DOE). These sites were primarily generated from 45 years worth of environmental pollution from the design and manufacture of nuclear materials and weapons, and contain numerous types of wastes including: (1) volatile, low-volatile and nonvolatile organics, (2) radionuclides (e.g., uranium, plutonium and cesium), (3) nonradioactive heavy metals (e.g., chromium, nickel, and lead), and (4) toxic chemicals. These contaminants affect several media including soils (saturated and unsaturated), groundwater, vegetation, and air. Numerous and diverse DOE hazardous waste sites can be enumerated from soils contaminated by organics such as trichloroethylene (TCE) and perchloroethylene (PCE) at the Savannah River site to biota and vegetation contaminated by radionuclides such as radiocesium and radiostrontium at the Oak Ridge site. Over the next 30 years, the Department of Energy (DOE) is committed to bringing all its facilities into compliance with applicable Federal, State, and local environmental laws and regulations. This clean-up task is quite complex involving numerous sites containing various radioactive, organic and inorganic contaminants. To perform this clean-up effort in the most efficient manner at each site will require that DOE managers have access to all available information on pertinent technologies; i.e., to aid in maximum technology transfer. The purpose of this effort is to systematically develop a databast of those currently available and emerging clean-up technologies.

  17. Optimum catalytic process for alcohol fuels from syngas: Seventh quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-10-29

    The objectives of this contract are to discover and evaluate the catalytic properties of novel homogeneous, heterogeneous, or combination catalytic systems for the production of alcohol fuel extenders from syngas, to evaluate analytically and on the bench scale novel reactor concepts for use in converting syngas to liquid fuel products, and to develop on the bench scale the best combination of chemistry, reactor, and total process configuration to achieve the minimum product cost for conversion of syngas to liquid fuel products. Catalysts investigated include: ruthenium and molybdenum sulfides impregnated with cobalt. 7 figs., 9 tabs.

  18. Instrumentation and process control for fossil demonstration plants. Quarterly technical progress report, April--June 1977

    Energy Technology Data Exchange (ETDEWEB)

    LeSage, L.G.

    1977-07-01

    Work has been performed on updating the study of the state-of-the-art of instrumentation for Fossil Demonstration Plants (FDP), development of mass-flow and other on-line instruments for FDP, process control analysis for FDP, and organization of a symposium on instrumentation and control for FDP. A Solids/Gas Flow Test Facility (S/GFTF) under construction for instrument development, testing, evaluation, and calibration is described. The development work for several mass-flow and other on-line instruments is described: acoustic flowmeter, capacitive density flowmeter, neutron activation flowmeter and composition analysis system, gamma ray correlation flowmeter, optical flowmeter, and capacitive liquid interface level meter.

  19. Key contributions in MHD power generation. Quarterly technical progress report, September 1, 1979-November 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Louis, J F

    1980-03-01

    Separate entries were made in the data base for the four tasks which include: (1) investigation of electrical behavior in the vicinity of electrode and insulating walls; (2) studies of critical performance issues in the development of combustion disk generators; (3) development and testing of electrode modules, including studies of insulator properties; and (4) determination of coal combustion kinetics and ash behavior relevant to two-stage MHD combustors, and investigation of the mixing and flow aerodynamics of a high swirl geometry second stage. (WHK)

  20. Technical progress report: Peripheral mower blade. Sixth quarter report ending 12/31/99

    Energy Technology Data Exchange (ETDEWEB)

    Darden, John A.

    2000-01-01

    Machine Tech Inc. has been assisting the author with the development of the peripheral mower blade decks. Machine Tech Inc. is still developing the batwing mower deck, which was started last fall after the completion of the mounted deck. The completion date of this program is slated for February. The wing covers and the center section of the batwing have been completed, the frame and drive-lines are now under development. Information from the nineteen-foot bat-wing deck prototype that they have been testing is now being used in the development of a more acceptable bat-wing mower. This unit will be able to maintain the same peripheral mower benefits, but will be much lighter and easier to pull requiring less fuel and damage to highway right of ways in soft areas. The mounted deck has been completed and is in the pilot stage with reports yet to be compiled. Machine Tech Inc. has also worked in an agricultural deck which is closely related to the mounted peripheral mower deck developed for the highway right of way. This will be one more outlet for the peripheral mower machines into the hands of the public.

  1. Isobutanol-methanol mixtures from synthesis gas. Quarterly technical progress report, 1 January--31 March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-20

    A series of CuMgCeO{sub x} catalysts have been prepared. Range of Cu dispersion, determined by N{sub 2}O titration, was 19-48% and are among the highest reported in the literature for Cu-based methanol and higher alcohol synthesis catalysts. Kinetics of MeOH and EtOH coupling reactions on Cu/ZnO and K-Cu/MgO/CeO{sub 2} catalysts indicate that Cu promotes alcohol dehydrogenation. Acetaldehyde is a reactive intermediate. High-pressure isobutanol synthesis studies have been carried out on K- and Cs-promoted Cu/MgO/CeO{sub 2} catalysts. The K promoter is more active than Cs for CO conversion, but the Cs promoter activates the C{sub 1} to C{sub 2} step more effectively. Catalysts with high alkali loading resulted in low conversions. Temperature programmed surface reaction studies of MeOH, EtOH, and acetaldehyde on MgO/CeO{sub 2}-based Cu catalysts show evolution of acetone, crotonaldehyde, methyl ethyl ketone, H2, carbon oxides. Neither EtOH nor acetaldehyde produces propionaldehyde or 1- propanol, suggesting that these C{sub 3} species can only form via reactions involving C{sub 1} and C{sub 2} oxygenate species.

  2. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation.

  3. Advanced gas turbine systems research. Technical quarterly progress report, January 1--March 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    Major accomplishments by AGTSR during this reporting period are highlighted and then amplified in later sections of this report. Main areas of research are combustion, heat transfer, and materials. Gas turbines are used for power generation by utilities and industry and for propulsion.

  4. Base program on energy related research. Quarterly technical progress report, November 1993--January 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This report consists of brief reports on a number of processes involving: gas injection in oil wells; coalbed methane recovery simulation; a portable data acquisition system; development of a premium fuel from western coal; optimization of recycle oil process for eastern oil shales; solid waste management and waste product utilization; mercury recovery from coal; remedial action taken with contaminated soils; and heavy oil/plastics co-processing.

  5. Exxon catalytic coal-gasification process development program. Quarterly technical progress report, October-December 1979

    Energy Technology Data Exchange (ETDEWEB)

    Euker, Jr, C. A.

    1980-03-01

    Work continued on the catalyst recovery screening studies to evaluate the economic impacts of alternative processing approaches and solid-liquid separation techniques. Equipment specifications have been completed for two cases with countercurrent water washing using rotary-drum filters for the solid-liquid separations. Material and energy balances have been completed for an alternative methane recovery process configuration using low pressure stripping which requires 26% less horsepower than the Study Design system. A study has been initiated to identify trace components which might be present in the CCG gas loop and to assess their potential impacts on the CCG process. This information will be used to assist in planning an appropriate series of analyses for the PDU gasifier effluent. A study has been initiated to evaluate the use of a small conventional steam reformer operating in parallel with a preheat furnace for heat input to the catalytic gasifier which avoids the potential problem of carbon laydown. Preliminary replies from ten manufacturers are being evaluated as part of a study to determine the types and performance of coal crushing equipment appropriate for commercial CCG plants. A material and energy balance computer model for the CCG reactor system has been completed. The new model will provide accurate, consistent and cost-efficient material and energy balances for the extensive laboratory guidance and process definition studies planned under the current program. Other activities are described briefly.

  6. Advanced direct liquefaction concepts for PETC generic units. Quarterly technical progress report, January--March 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    In the Advance Coal Liquefaction Concept Proposal (ACLCP) carbon monoxide (CO) and water have been proposed as the primary reagents in the pretreatment process. The main objective of this project is to develop a methodology for pretreating coal under mild conditions based on a combination of existing processes which have shown great promise in liquefaction, extraction and pyrolysis studies. The aim of this pretreatment process is to partially depolymerise the coal, eliminate oxygen and diminish the propensity for retograde reactions during subsequent liquefaction. The desirable outcome of the CO pretreatment step should be: (1) enhanced liquefaction activity and/or selectivity toward products of higher quality due to chemical modification of the coal structure; (2) cleaner downstream products; (3) overall improvement in operability and process economics.

  7. Power systems development facility. Quarterly technical progress report, July 1, 1994--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: (1) Carbonizer/Pressurized Circulating Fluidized Bed Gas Source. (2) Hot Gas Cleanup Units to mate to all gas streams. (3) Combustion Gas Turbine. (4) Fuel Cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF).

  8. Central Receiver Solar Thermal Power System, Phase 1. CDRL Item 10. First quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Hallet, Jr., R. W.; Gervais, R. L.

    1976-01-01

    The current definition of a 10-MWe pilot plant preliminary design base line is presented, as well as a summary of a 100-MWe commercial plant base line. The subsystems described for the plants include the collector, receiver, thermal storage, and electrical power generation. A master control concept employing a centralized computer is also described. The subsystem research experiment activities for the collector, receiver, and thermal storage subsystems are presented, including a summary of SRE test requirements, overall test scheduling, and status through the conceptual design review phase of the SRE effort.

  9. Process feasibility study in support of silicon material Task I. Quarterly technical progress report (VI)

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, K.C.; Miller, J.W. Jr.; Yaws, C.L.

    1977-03-01

    During this reporting period, major effects were expended on process system properties, chemical engineering and economic analyses. Major activities were continued on process system properties of silicon source materials under consideration for solar cell grade silicon production. In property correlation efforts, property data results are presented for heat of vaporization, gas heat capacity, liquid heat capacity, liquid density, surface tension and gas viscosity of silane (SiH/sub 4/) as a function of temperature. Major chemical engineering analysis activities are being devoted to preliminary process design for a silane (SiH/sub 4/) plant that will produce 1000 metric tons/year of solar cell grade silicon. The technology developed by Union Carbide for the production of silane uses hydrogen and metallurgical grade silicon as raw materials. Preliminary process flow diagram and base conditions are reported. Preliminary process design was initiated for the conventional polysilicon process now used in the United States to produce semiconductor grade silicon from TCS (trichlorosilane, SiHCl/sub 3/). Economic analysis activities in Task 3 focused on development of a computer model to aid in estimation of product and plant investment costs for the alternate solar cell grade silicon processes. Application of the computer model to the Battelle process (Zn/SiCl/sub 4/) indicated $10,510,000 fixed capital investment and $9.63/KG of silicon for a 1000 metric ton/yr. plant. Economic analysis activities also centered on developing cost standardization techniques for application to the alternate processes.

  10. Solvent refined lignite process development. Quarterly technical progress report No. 3, January--March 1978

    Energy Technology Data Exchange (ETDEWEB)

    Severson, D.E.

    1978-07-12

    Six runs, each nominally at one week's duration, M-34 through M-39, were completed; this concludes the PDU experimental program for Project Lignite. The first three runs concluded the series to study the effects of different lignites on plant operability and product yields. Runs M-37 and M-38 were made using two Montana subbituminous coals. It was concluded that coals with the highest ash content, both lignite and subbituminous coals, gave greater overall conversion to gaseous and liquid organic products. The subbituminous coals gave lower gas yields and lower overall conversion while producing similar liquid yields when compared with lignite. Reactor solids build up rapidly during initial operations, then level off and remain constant at 29 pounds per cubic foot of reactor volume as a run proceeds. Reactor solids evidently are composed of clay minerals and large particles of pyridine insoluble organic material when processing either lignites or subbituminous coals; in addition calcium/magnesium carbonate crystals (calcite/dolomite) are present in the case of lignite. Long term, trouble-free operation of the deashing unit was not accomplished. Integration of the unit for several hours of combined operation of the process was achieved, and the product from the deashing unit contained as low as 0.6% ash and pyridine insoluble material. Solids buildup in the solids settling tower was a continuing problem.

  11. LLL geothermal industrial support program first quarter technical progress report for FY1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-09

    The LLL field brine-scaling test system and a variety of measurement techniques have been used to test a group of eight proprietary additives from eight different companies, a hydroxyethylcellulose previously found to retard silica precipitation, and geothermal sludge as a seeding agent to reduce scaling. For each additive, scaling rates at both 210 and 125/sup 0/C and on three different materials--mild steel, Teflon, and Hastelloy C-276 were measured using test coupons. Sections of steel pipe and perforated screens also were exposed to the treated brine, silica precipitation rates in the effluent brine were measured by means of the electrochemical linear polarization resistance technique. Examination of the pipe secions and chemical analyses of the scales are not complete, thus only preliminary conclusions are reported here. It appears that, although none of the additives effected a dramatic reduction in scaling rates, several decreased the rate of scaling of mild steel at 125/sup 0/C by a factor of 2 to 3. Only hydroxyethylcellulose retards the rate of precipitation of silica in the effluent brine. Scaling rates could not be measured accurately in the seeding experiment because of its short duration, but this brine treatment had the desried effect, at 125/sup 0/C, of reducing the level of dissolved silica and hence the scaling tendency of the brine. Further experiments of this type will be conducted.

  12. MHD Coal-Fired Flow Facility. Quarterly technical progress report, April-June 1980

    Energy Technology Data Exchange (ETDEWEB)

    Altstatt, M. C.; Attig, R. C.; Baucum, W. E.

    1980-07-31

    Significant activity, task status, planned research, testing, development, and conclusions for the Magnetohydrodynamics (MHD) Coal-Fired Flow Facility (CFFF) and the Energy Conversion Facility (ECF), formerly the Research and Development Laboratory, are reported. CFFF Bid Package construction is now virtually complete. The remaining construction effort is being conducted by UTSI. On the quench system, another Task 1 effort, the cyclone was erected on schedule. On Tasks 2 through 6, vitiation heater and nozzle fabrication were completed, an investigation of a fish kill (in no way attributable to CFFF operations) in Woods Reservoir was conducted, major preparation for ambient air quality monitoring was made, a broadband data acquisition system for enabling broadband data to be correlated with all general performance data was selected, a Coriolis effect coal flow meter was installed at the CFFF. On Task 7, an analytical model of the coal flow combustor configuration was prepared, MHD generator testing which, in part, involved continued materials evaluation and the heat transfer characteristics of capped and uncapped electrodes was conducted, agglomerator utilization was studied, and development of a laser velocimeter system was nearly completed.

  13. Design of slurry reactor for indirect liquefaction applications. Quarterly technical progress report, January 1991--March 1991

    Energy Technology Data Exchange (ETDEWEB)

    Prakash, A.; Bendale, P.G.

    1991-04-08

    The objective of this project is to design a conceptual slurry reactor for two indirect liquefaction applications; production of methanol and production of hydrogen fuels via Fischer-Tropsch route. The work will be accomplished by the formulation of reactor models for both the processes and use computer simulation. Process data, kinetic and thermodynamic data, heat and mass transfer data and hydrodynamic data will be used in the mathematical models to describe the slurry reactor for each of the two processes. The cost of current vapor phase reactor systems will be compared with cost estimated for the slurry reactor systems. For the vapor phase systems, upstream and downstream processing equipments may have to be included during cost analysis for a meaningful cost comparison.

  14. Instrumentation and process control for fossil demonstration plants. Quarterly technical progress report, October--December 1976

    Energy Technology Data Exchange (ETDEWEB)

    LeSage, L. G.; O' Fallon, N. M; Bump, T. R.; Cohn, C. E.; Doering, R. W.; Duffey, D.; Kirsch,; Lipinski, W. C.; Managan, W. W.; Porges, K. G.; Raptis, A. C.

    1977-01-01

    The final report of the state-of-the-art study of instrumentation for process control and safety in large-scale coal conversion and fluidized-bed combustion systems was distributed in November. A conceptual design for the Solids/Gas Flow Test Facility has been initiated, the major components identified, and vendors located. Work on acoustic flow measurement has included theoretical feasibility studies of acoustic/ultrasonic techniques for mass-flow measurements of slurries and solid/gas media. Initial planning was conducted to establish a laboratory facility necessary to verify theoretical findings. A survey of the literature relating to capacitive measurements was begun to provide a basis for conceptual designs and preliminary bench tests of the feasibility of these designs. Conceptual design of a capacitive on-line solids density measuring device and calculations to select the type of system for initial feasibility tests were carried out. Preliminary tests of neutron capture gamma analysis for on-line elemental composition of liquid and solid streams in coal plants indicate that most coal elements can be detected quantitatively through the pipe walls. A computer program for peak-fitting in the gamma spectrum was modified for requirements of this work. A literature search was started to determine the state-of-the-art in dynamic process modeling of fossil energy system components, physical property models, and process control models. A partial review of abstracts from a computerized literature search has identified over 50 references having possible application to process analysis activities in this program.

  15. Selenium fractionation and cycling in the intertidal zone of the Carquinez Strait. Quarterly progress report, January 1996--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Zawislanski, P.T.; Benson, S.M.; Brownfield, A.A. [and others

    1996-04-01

    This quarterly report describes research on selenium (Se) cycling in the marshes and mudflats of the Carquinez Strait between January 1, 1996 and March 31, 1996. Chapter 2 contains descriptions of results of extractions and analyses of sediment cores from the intertidal zone of the Martinez and Benicia field sites, including some x-ray spectroscopy data related to the characterization of the sediment Eh-pH regime. Chapter 3 contains a summary of work in progress on the extraction of various Se species from sediment/soil samples, and efforts in measuring suspended sediment Se. Chapter 4 is an update on stable Se isotope research and Se purification techniques. Chapter 5 describes the rationale, design, and preliminary results of a plant-Se study. Chapter 6 presents the design of a recently initiated sediment dynamics study. The leader is referred to the 1995 Annual Report for details on the project design, site selection, and methodology.

  16. Selenium fractionation and cycling in the intertidal zone of Carquinez Strait. Quarterly progress report, April 1996--June 1996

    Energy Technology Data Exchange (ETDEWEB)

    Zawislanski, P.T.; Benson, S.M.; Brownfield, A.A.; Chau, S. [and others

    1996-07-01

    This quarterly report describes research on selenium (Se) cycling in the marshes and mudflats of the Carquinez Strait between 4/1/96 and 6/30/96. Chapter 2 contains descriptions of results of extractions and analyses of sediment cores from the intertidal zone of the Martinez and Benicia field sites, including Se fractionation data from Martinez Regional Park. Chapter 3 contains a summary of work in progress on the extraction of various Se species from sediment/soil samples, and efforts in measuring suspended sediment Se. Chapter 4 is an update on stable Se isotope research and Se purification techniques. Chapter 5 describes the recent developments in low-level Se analytical methods. Chapter 6 presents preliminary sedimentation rate data from the Martinez field site. Exciting new developments in x-ray spectroscopy of clams are presented in Chapter 7. The reader is referred to the 1995 Annual Report for details on the project design, site selection, and methodology.

  17. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  18. Engineering and Physics Optimization of Breed and Burn Fast Reactor Systems; NUCLEAR ENERGY RESEARCH INITIATIVE (NERI) QUARTERLY PROGRESS REPORT

    Energy Technology Data Exchange (ETDEWEB)

    ERROR, [value too long for type character varying(50); Hejzlar, Pavel; Yarsky, Peter; Driscoll, Mike; Wachs, Dan; Weaver, Kevan; Czerwinski, Ken; Pope, Mike; Parry, James; Marshall, Theron D.; Davis, Cliff B.; Crawford, Dustin; Hartmann, Thomas; Saha, Pradip

    2005-01-31

    This project is organized under four major tasks (each of which has two or more subtasks) with contributions among the three collaborating organizations (MIT, INEEL and ANL-West): Task A: Core Physics and Fuel Cycle; Task B: Core Thermal Hydraulics; Task C: Plant Design; Task D: Fuel Design The lead PI, Michael J. Driscoll, has consolidated and summarized the technical progress submissions provided by the contributing investigators from all sites, under the above principal task headings.

  19. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  20. Technical progress of nuclear energy: economic and environmental prospects

    Energy Technology Data Exchange (ETDEWEB)

    Naudet, G.

    1994-12-31

    This document deals with three different aspects of the nuclear energy: first the operating and economic performances of nuclear power plants in the world, the French nuclear competitiveness. Then, the technical and economic perspectives about reactors and fuels cycle and the advantages towards atmospheric pollution are discussed to favour a new worldwide nuclear development. (TEC). 8 refs., 4 figs., 6 tabs.

  1. Process heat reactor design and analaysis. Quarterly progress report, April 1-June 30, 1978

    Energy Technology Data Exchange (ETDEWEB)

    1978-06-30

    This report summarizes the third quarter FY-1978 results of concept design studies at General Atomic Company (GA) for an 842-MW(t) VHTR utilizing an intermediate helium heat transfer loop to provide thermal energy for the production of reducing gas (H/sub 2/ + CO) by steam-reforming a light hydrocarbon. Basic carbon sources may be coal, residual, or oil shale. The report summarizes the various plant configurations selected for the study and presents the conceptual plant layout drawings. Results of design studies on the intermediate heat exchanger are also presented. The status of the performance/optimization code development is discussed, and completion of the core auxiliary cooling system study is summarized.

  2. Thorium utilization program. Quarterly progress report for the period ending May 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    1977-06-01

    Results of work performed under the National HTGR Fuel Recycle Program (also known as the Thorium Utilization Program) at General Atomic Company are presented. Results of work on this program prior to June 1974 were included in a quarterly series on the HTGR Base Program. The work reported includes the development of unit processes and equipment for reprocessing of High-Temperature Gas-Cooled Reactor (HTGR) fuel, the design and development of an integrated pilot line to demonstrate the head end of HTGR reprocessing using unirradiated fuel materials, and design work in support of Hot Engineering Tests (HET). Work is also described on trade-off studies concerning the required design of facilities and equipment for the large-scale recycle of HTGR fuels in order to guide the development activities for HTGR fuel recycle.

  3. Anaerobic fermentation of agricultural residues: potential for improvement and implementation. Seventh quarter progress report, December 16, 1977--March 15, 1978

    Energy Technology Data Exchange (ETDEWEB)

    Jewell, W.J.; Guest, R.W.; Loehr, R.C.; Price, D.R.; Gunkel, W.W.; Van Soest, P.J.

    1978-01-01

    This is the seventh progress report of an on-going three year research effort to contribute to the development of a new and/or improved technology that will result in wide spread use of an anaerobic fermentation in agriculture to generate a renewable clean energy source. Activities are now concentrating on full-scale and pilot-scale demonstration of simplified fermentors for manures. Activities for the seventh quarter year, extending from December 16, 1977 to March 15, 1978, have included the following: completion of construction of the full scale conventional control fermenter; completion of construction, testing and startup of the random mix fermenter; installation of feed and effluent lines, electrical wiring, boilers, gas lines and controls; successful testing of the ram pump; conclusion of the 35/sup 0/C studies with the pilot scale plug flow fermenter and the initiation of the low temperature (25/sup 0/C) studies; and preparation of a detailed outline to the design manual. As of March 15, 1978, the overall progress achieved with the major components of the project was estimated to be about 2.5 months behind the work plan schedule. As detailed in the last progress report, much of this delay has been due to the winter weather (i.e., cold temperatures, snow, frozen ground, etc.) which has interfered with excavation and other outdoor construction activities.

  4. Evaporation by mechanical vapor recompression. Technical progress report, September 1-December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Iverson, C.H.; Coury, G.E.

    1979-01-01

    Progress to date in the development of a study of the application of the technologies of mechanical vapor recompression and falling film evaporators as applied to the beet sugar industry is reported. Progress is reported in the following areas: technical literature search and plant visitations of existing applications of VR/FFE.

  5. Systems study of fuels from grains and grasses. Quarterly progress report, July--October 1976

    Energy Technology Data Exchange (ETDEWEB)

    Benson, W.; Allen, A.; Athey, R.; McElroy, A.

    1976-11-15

    The specific objectives of the project are to determine on a geographic basis the current and potential USA production capability for grain and grass crops, to perform a preliminary screening of conversion processes, and to perform preliminary technical and economic feasibility analyses. The results obtained to date on biomass production, conversion processes, and data management are reported. (JSR)

  6. Reactor safety research programs. Quarterly progress report, October 1--December 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Romano, A.J. (comp.)

    1978-01-01

    HTGR safety evaluation included studies on fission product release; materials, chemistry, and instrumentation; structural evaluation; and analytical safety evaluation. LMFBR safety evaluation included studies on accident sequences, technical coordination of structural integrity, and SSC code development and validation. LWR safety studies included thermal/hydraulic accident analysis, THOR code development, and stress corrosion cracking of PWR steam generator tubing.

  7. [National Institute for Petroleum and Energy Research] quarterly technical report, October 1--December 31, 1992. Volume 2, Energy production research

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    Accomplishments for the past quarter are described for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and microbial technology.

  8. Damage analysis and fundamental studies. Quarterly progress report, October-December 1979

    Energy Technology Data Exchange (ETDEWEB)

    Doran, D. G.

    1980-02-01

    Progress on each of the following topics is outlined: (1) rotating target neutron source, (2) fusion materials irradiation test facility, (3) environmental characterization, (4) damage production, and (5) damage microstructure evolution and mechanical behavior. (MOW)

  9. LANL technical progress update for US HJPRR working group

    Energy Technology Data Exchange (ETDEWEB)

    Dombrowski, David E [Los Alamos National Laboratory

    2011-01-06

    The outline of this presentation is: (1) Collaboration on Master Alloy Melting; (2) Data for Safety Analysis, (3) HIP can development status, (4) Bond strength quality, (5) Plasma spraying results, and (6) Bare Rolling Larger Rolling Ingots. Significant near term progress has been made in five areas: (1) Collaboration on Master Alloy Melting; (2) HIP can development status; (3) Bond strength quality; (4) Plasma spraying results; and (5) Bare Rolling Larger Rolling Ingots. Significant progress is expected in the next month on several important areas: (1) Intrinsic bond strength of plasma sprayed Zr (2) Advanced Cleaning; (3) Residual Stress Collaboration with INL; and (4) Cost Metric Assessment.

  10. LLL Gas Stimulation Program. Quarterly progress report, July--September 1978

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, M.E.; Anderson, G.D.; Shaffer, R.J.; Emerson, D.O.; Swift, R.P.; O' Banion, K.; Cleary, M.P.; Haimson, B.; Knutson, C.F.; Boardman, C.R.

    1978-11-06

    The research and accomplishments of the LLL Gas Stimulation program during the fourth quarter of Fiscal Year 1978 is summarized. Two-dimensional theoretical models were applied to analyze the changes in the elastic stress field resulting from the presence of lenses in a surrounding medium. Here the lenses had different elastic moduli than the surrounding medium, and the emplaced load was assumed to be caused by the overburden. In these calculations, it is noted that the growth of a vertical fracture toward a lens with elastic moduli larger than the surrounding medium would be impeded. Other two-dimensional calculations indicate some effects of material parameter changes across an interface on fracture mechanics. These calculations confirm that when a fracture in a lower modulus material aproaches a well-bonded interface in a higher modulus material, the stress intensity factor decreases. Experimental results show that water saturation can significantly effect hydraulic fracture propagation. An example is a hydraulic fracture across a normally loaded interface from an unsaturated limestone block into a saturated block but not conversely for the same hydraulic pressure and normal load. Some preliminary experiments were conducted to determine how rock behaves when subjected to loads at rates higher than hydraulic fracturing but lower than explosive charges. Results indicate more than the two fracture wings common to normal hydraulic fracturing. A survey of several operators and logging companies operating in the western tight gas sands shows that log measurements do not define pertinent reservoir parameters accurately enough to exploit these reservoirs.

  11. Environmental Research Division technical progress report: January 1986--October 1987

    Energy Technology Data Exchange (ETDEWEB)

    1988-07-01

    Technical process in the various research activities of Argonne National Laboratory's Environmental Research Division is reported for the period 1986-1987. Textual, graphic, and tabular information is used to briefly summarize (in separate chapters) the work of the Division's Atmospheric Physics, Environmental Effects Research, Fundamental Molecular Physics and Chemistry, and Organic Geochemistry and Environmental Instrumentation Programs. Information on professional qualifications, awards, and outstanding professional activities of staff members, as well as lists of publications, oral presentations, special events organized, and participants in educational programs, are provided in appendices at the end of each chapter. Individual projects under each division are processed separately for the data bases.

  12. Technical Progress Report for the Gas Storage Technology Consortium

    Energy Technology Data Exchange (ETDEWEB)

    Joel L. Morrison; Sharon L. Elder

    2006-02-27

    Gas storage is a critical element in the natural gas industry. Producers, transmission and distribution companies, marketers, and end users all benefit directly from the load balancing function of storage. The unbundling process has fundamentally changed the way storage is used and valued. As an unbundled service, the value of storage is being recovered at rates that reflect its value. Moreover, the marketplace has differentiated between various types of storage services, and has increasingly rewarded flexibility, safety, and reliability. The size of the natural gas market has increased and is projected to continue to increase towards 30 trillion cubic feet (TCF) over the next 10 to 15 years. Much of this increase is projected to come from electric generation, particularly peaking units. Gas storage, particularly the flexible services that are most suited to electric loads, is critical in meeting the needs of these new markets. In order to address the gas storage needs of the natural gas industry, an industry-driven consortium was created--the Gas Storage Technology Consortium (GSTC). The objective of the GSTC is to provide a means to accomplish industry-driven research and development designed to enhance operational flexibility and deliverability of the Nation's gas storage system, and provide a cost effective, safe, and reliable supply of natural gas to meet domestic demand. This report addresses the activities for the quarterly period of October 1, 2005 through December 31, 2005. Activities during this time period were: (1) Nomination and election of Executive Council members for 2006-07 term, (2) Release the 2006 GSTC request-for-proposals (RFP), (3) Recruit and invoice membership for FY2006, (4) Improve communication efforts, and (5) Continue planning the GSTC spring meeting in San Diego, CA on February 21-22, 2006.

  13. LANL Q2 2016 Quarterly Progress Report. Science Campaign and ICF

    Energy Technology Data Exchange (ETDEWEB)

    Douglas, Melissa Rae [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-04-07

    This progress report includes highlights for the Science Campaign and ICF about Advanced Certification and Assessment Methodologies, Implosion Hydrodynamics (C-1, SCE), Materials and Nuclear Science (C-1, C-2), Capabilities for Nuclear Intelligence, and High Energy Density Science (C-1, C-4, C-10). Upcoming meetings, briefings, and experiments are then listed for April and May.

  14. Light-water-reactor safety research program. Quarterly progress report, July--September 1975

    Energy Technology Data Exchange (ETDEWEB)

    1975-01-01

    Progress is summarized in the following research and development areas: (1) loss-of-coolant accident research; heat transfer and fluid dynamics; (2) transient fuel response and fission-product release; and (3) mechanical properties of Zircaloy containing oxygen. Also included is an appendix on Kinetics of Fission Gas and Volatile Fission-product Behavior under Transient Conditions in LWR Fuel.

  15. DOE Waste Package Project. Quarterly progress report, January 1, 1995--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Ladkany, S.G.

    1995-05-01

    Research progress is reported on the design of containers for high-level radioactive wastes to be emplaced at the Yucca Mountain underground repository. Tasks included: temperature distribution and heat flow around the containers; failure possibility due to mechanical stresses and pitting corrosion; robotic manipulation of the containers; and design requirements of rock tunnel drift for long term storage.

  16. Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, October 1980-December 1980

    Energy Technology Data Exchange (ETDEWEB)

    Kelsey, J.R. (ed.)

    1981-03-01

    The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development.

  17. Alloy development for irradiation performance. Quarterly progress report for period ending December 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-04-01

    Progress is reported in eight sections: analysis and evaluation studies, test matrices and test methods development, Path A Alloy Development (austenitic stainless steels), Path C Alloy Development (Ti and V alloys), Path D Alloy Development (Fe alloys), Path E Alloy Development (ferritic steels), irradiation experiments and materials inventory, and materials compatibility and hydrogen permeation studies. (DLC)

  18. Geothermal Drilling and Completion Technology Development Program. Quarterly progress report, January 1981-March 1981

    Energy Technology Data Exchange (ETDEWEB)

    Kelsey, J.R. (ed.)

    1981-06-01

    The progress, status, and results of ongoing Research and Development (R and D) within the Geothermal Drilling and Completion Technology Development Program are described. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods as they apply to advanced drilling systems.

  19. Alloy development for irradiation performance. Quarterly progress report for period ending December 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-04-01

    Progress is reported in eight sections: analysis and evaluation studies, test matrices and test methods development, Path A Alloy Development (austenitic stainless steels), Path C Alloy Development (Ti and V alloys), Path D Alloy Development (Fe alloys), Path E Alloy Development (ferritic steels), irradiation experiments and materials inventory, and materials compatibility and hydrogen permeation studies. (DLC)

  20. Alloy development for irradiation performance. Quarterly progress report for period ending December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Ashdown, B.G. (comp.)

    1980-04-01

    Progress is reported concerning preparation of a materials handbook for fusion, creep-fatigue of first-wall structural materials, test results on miniature compact tension fracture toughness specimens, austenitic stainless steels, Fe-Ni-Cr alloys, iron-base alloys with long-range crystal structure, ferritic steels, irradiation experiments, corrosion testing, and hydrogen permeation studies. (FS)

  1. Solar hot water space heating system. Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Van Dam, T

    1979-08-13

    A retrofit solar heating system was installed on Madison Hall at Jordan College, Cedar Springs, Michigan. The system provides heating and domestic water preheating for a campus dormitory. Freeze protection is provided by a draindown system. The building and solar system, construction progress, and design changes are described. Included in appendices are: condensate trap design, structural analysis, pictures of installation, operating instructions, maintenance instructions, and as-built drawings. (MHR)

  2. C-Mod Collaboration Informal Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth W. Gentle

    2007-12-31

    The aims of the collaboration have not changed. A specific list of tasks was agreed upon during the Fall of 2006 in preparation for the 2007 C-Mod campaign by Earl Marmar, Head of the Alcator Project, Kenneth Gentle, Principal Investigator, and William Rowan, Collaboration Coordinator with the facilitation of Adam Rosenberg (DOE grant monitor for the collaboration). The activities follow the list of tasks and are discussed in this progress report.

  3. Monthly technical progress report, January 1, 1996 - January 28, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-24

    This is the January 1996 progress report contract DE-AC03-91SF18852 Radioisotope Thermoelectric Generators and Ancillary Activities, Cassini RTG Program. Included are discussions on the status of: (1) spacecraft integration and support, (2) engineering support, (3) safety, (4) qualified unicouple production, (5) ETG fabrication, Assembly, and Test, (6) ground support equipment, (7) RTG shipping and launch support, (8) designs, reviews, and mission applications, (9) project management, and (10) CAGO acquisition.

  4. Fuel performance improvement program. Quarterly progress report, April--June 1978. [LWR

    Energy Technology Data Exchange (ETDEWEB)

    Crouthamel, C.E. (comp.)

    1978-07-01

    The Fuel Performance Improvement Program has as its objective the identification and demonstration of fuel concepts with improved power ramp performance. Improved fuels are being sought to allow reduction or elimination of fuel related operating guidelines on nuclear power plants such that the fuel may be power maneuvered within the rates allowed by the system technical specifications. The program contains a combination of out-of-reactor studies, in-reactor experiments and in-reactor demonstrations. Fuel concepts initially being considered include annular pellets, cladding internally coated with graphite and packed-particle fuels. The performance capability of each concept will be compared to a reference fuel of contemporary pellet design by irradiations in the Halden Boiling Water Reactor. Fuel design and process development is being completed and fuel rod fabrication will begin for the Halden test rods and for the first series of in-reactor experiments. The in-reactor demonstrations are being performed in the Big Rock Point reactor to show that the concepts pose no undue risk to commercial operation. Additional concepts may be considered as the result of a state-of-the-technology review of fuel-cladding interaction and assessment of fuel concepts and the out-of-reactor studies. The results of the program will be used to establish the technical bases for design of fuels with improved power ramp performance.

  5. Technical Progress Has Positive,Differentiated Effects on Energy Efficiency of Chinese Industries

    Institute of Scientific and Technical Information of China (English)

    李廉水; 周勇

    2007-01-01

    The rebound effects of technological advancement on energy consumption make it very complicated to measure the impact of technological advancement on energy efficiency.This article,taking 35 industries as samples,utilizes the non-parameter DEA-Malmquist productivity approach to subcategorise technological advancement into three parts:science-technological(sci-tech)progress,pure technical efficiency and efficiency of scale.The panel technique is then used to work out each subcategory’s contribution to energy efficiency individually.Findings show that technological efficiency (calculated by multiplying the results of pure technical efficiency and scale efficiency)is the principal factor in the improvement of energy efficiency while the contribution from sci-tech progress is comparatively less.Overtime,however,the effect of sci-tech progress is gradually heightened while the effect of technical efficiency slowly diminishes.

  6. Low cost solar array project. Quarterly progress report, January-March, 1981

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The engineering design, fabrication, assembly, operation, economic analysis, and process support R and D for an Experimental Process System Development Unit (EPSDU) are presented. The civil construction work was completed and the mechanical bid package is in preparation. The electrical design effort is in progress. Parallel efforts which complement the mechanical design are the process flow diagrams and control instrumentation logic for startup operation and shutdown. These are in progress and will identify all process and utility streams, control systems, and flow logic. The data collection system takes the signals from the instrumentation, translates them into engineering units and finally develops a data report which summarizes all key performance parameters. Cleaning procedures have been established to assure a contamination-free product and inspection visits have been made to the fabricators of specialty equipment.

  7. Integral glass encapsulation for solar arrays. Quarterly progress report No. 13

    Energy Technology Data Exchange (ETDEWEB)

    Landis, Geoffrey A.

    1980-03-01

    Progress on the development of electrostatic bonding as a method of integrally encapsulating silicon solar cells in glass is reported. Efforts for the current phase of this program are to continue to demonstrate process uniformity of encapsulation by electrostatic bonding. An additional goal for this program is to develop preformed contacts as a method of integrating cell processing into the encapsulation procedure, resulting in a low-cost module assembly technique.

  8. Geothermal drilling and completion technology development program. Quarterly progress report, April-June 1980

    Energy Technology Data Exchange (ETDEWEB)

    Varnado, S.G.

    1980-07-01

    The progress, status, and results of ongoing research and development (R and D) within the Geothermal Drilling and Completion Technology Development Program are reported. The program emphasizes the development of geothermal drilling hardware, drilling fluids, completion technology, and lost circulation control methods. Advanced drilling systems are also under development. The goals of the program are to develop the technology required to reduce well costs by 25% by 1983 and by 50% by 1987.

  9. Electric and hybrid vehicle program: Site operator program. Quarterly progress report, April--June, 1994 (3rd quarter of FY-1994)

    Energy Technology Data Exchange (ETDEWEB)

    Kiser, D.M.; Brown, H.L.

    1994-10-01

    The DOE Site Operator Program was initially established to meet the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. The Program has since evolved in response to new legislation and interests. Its mission now includes three major activity categories; advancement of Electric Vehicle (EV) technologies, development of infrastructure elements needed to support significant EV use, and increasing public awareness and acceptance of EVs. The 13 Program participants, their geographic locations, and the principal thrusts of their efforts are identified. The EV inventories of each participant are summarized. This third quarter report (FY-94) will include a summary of activities from the previous three quarters. The report section sequence has been revised to provide a more easily seen program overview, and specific operator activities are now included.

  10. Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the US Department of Energy, quarter ending March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Ruhter, W.D.; Strait, R.S.; Mansur, D.L.; Davis, G.

    1993-04-01

    This quarterly report discusses activities in the Safeguards Technology Program (STP) which is a program in LLNL`s Nuclear Chemistry Division that develop advanced, nondestructive-analysis (NDA) technology for measurement of special nuclear materials. The work focuses on R&D relating to x{minus} and gamma-ray spectrometry techniques and to the development of computer codes for interpreting the spectral data obtained by these techniques.

  11. Lawrence Livermore National Laboratory safeguards and security quarterly progress report to the US Department of Energy. Quarter ending June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Davis, B.; Davis, G.; Johnson, D; Mansur, D.L.; Ruhter, W.D.; Strait, R.S.

    1996-07-01

    LLNL carries out safeguards and security activities for DOE Office of Safeguards and Security (OSS) and other organizations, both within and outside DOE. This document summarizes activities conducted for OSS during this quarter. LLNL is supporting OSS in six areas: safeguards technology, safeguards and materials accountability, computer security/distributed system, complex-wide access control, standardization of security systems, and information technology & security center. This document describes the activities in each of these six areas.

  12. Texas Experimental Tokamak. Technical progress report, April 1990--April 1993

    Energy Technology Data Exchange (ETDEWEB)

    Wootton, A.J.

    1993-04-01

    This progress report covers the period from November 1, 1990 to April 30, 1993. During that period, TEXT was operated as a circular tokamak with a material limiter. It was devoted to the study of basic plasma physics, in particular to study of fluctuations, turbulence, and transport. The purpose is to operate and maintain TEXT Upgrade as a complete facility for applied tokamak physics, specifically to conduct a research program under the following main headings: (1) to elucidate the mechanisms of working gas, impurity, and thermal transport in tokamaks, in particular to understand the role of turbulence; (2) to study physics of the edge plasma, in particular the turbulence; (3) to study the physics or resonant magnetic fields (ergodic magnetic divertors, intra island pumping); and (4) to study the physics of electron cyclotron heating (ECRH). Results of studies in each of these areas are reported.

  13. TECHNICAL TRAINING SEMINAR: High Temperature Superconductors: Progress and Issues

    CERN Multimedia

    Davide Vitè

    2002-01-01

    Monday 24 June from 14:30 to 15:30 - Training Centre Auditorium - bldg. 593-11 High Temperature Superconductors: Progress and Issues Prof. Jan Evetts / UNIVERSITY OF CAMBRIDGE, Department of Materials Science and Metallurgy, UK Grappling with grain boundaries: Current transport processes in granular High Temperature Superconductors (HTS) The development of High Temperature Superconductors, seen from a materials scientist's point of view, is relevant to the superconductivity community at CERN: their possible high current applications can include high performance magnets for future accelerators. There is an urgent need to develop a quantitative description of HTS conductors in terms of their complex anisotropy, inhomogeneity and dimensionality. This is essential both for the practical specification of a conductor and for charting routes to conductor optimisation. The critical current, the n-value, dissipation and quenching characteristics are amongst most important parameters that make up an engineering specifi...

  14. ASCI Program 4Q FY-99-Quarterly Progress Report (Unclassified Projects)

    Energy Technology Data Exchange (ETDEWEB)

    Pierce, R.; Christensen, R.

    1999-11-01

    PSE is made up of four technical areas, ASCI Simulation Development Environment (ASDE), Data Exploration and Management (DEM), Data Transfer and Storage (DTS), and Distributed Systems (DS). The goal of ASDE is to create a truly scalable simulation development environment across ASCI platforms. Specific objectives are to improve the environment to accelerate application development, to improve reliability of codes, and to enable better scalable performance. DEM's effort is to provide an interactive environment for efficiently and visualizing massive amounts of data. WE are working to help scientists spend more time concentrating on data understanding by providing tools that both enhance interactions and minimize unnecessary manipulations of data. The goal of DTS is to provide multiple gigabytes/sec parallel data transfer, multiple petabytes of archival mass storage, and new architectures for ''end-to-end'' I/O all helping to ensure the highest utilization of ASCI resources. DS consists of secure networking, secure distributed computing, and resource management for ASCI platforms. These three research and development activities are fundamental to the creation of the basic infrastructure for the ASCI computing environment.

  15. Low-temperature thermal energy storage quarterly progress report for period July--September 1976. [Phase-change materials

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, H. W.; Kedi, R. J.

    1977-01-31

    The document is the second in a series of quarterly progress reports covering activities funded at ORNL by the ERDA Division of Energy Storage Systems to develop low-temperature thermal energy storage (TES) technology. These systems will be based on either sensible or latent heat storage at temperatures up to approximately 250/sup 0/C. At ORNL, research efforts were continued to (a) develop a time-dependent analytical model that will describe a TES system charged with a phase-change material, (b) measure thermophysical properties and melt-freeze cyclic behavior of interesting PCM's and (c) determine crystal lattice structures of hydrated salts and their nucleators. A report on TES subsystems for application to solar energy sources was completed and is being reviewed. In the area of program management, subcontracts were signed with Clemson University, Dow Chemical Company, Suntek Research Associates, and The Franklin Institute. Detailed reviews were completed for ten unsolicited proposals related to TES. Industries, research institutions, universities, and other national laboratory participation in the TES program, for which ORNL has management responsibilities, are listed.

  16. Dirt feedlot residue experiments. Quarterly progress report, October 1, 1977--November 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Turk, M.

    1977-01-01

    Progress is reported in development of a mobile fermentation system at the Monfort feedlot. Continued use was made of aged pen 307 residue at a nominal loading rate of 0.25 pounds volatile solids/ft/sup 3//day along with a 10-day retention time and an operating temperature of 57/sup 0/C for the purpose of establishing comparative yields. The ten-day running average of specific methane yield increased to an indicated yield of 3.0 ft/sup 3/ CH/sub 4//No. volatile solids representing approximately 75 percent of that obtained from the fresh residue. During this entire period no attempts at controlling total volatile acid concentration were made. Preliminary investigation of the centrifuge capture efficiency was begun. (JGB)

  17. TRW Advanced Slagging Coal Combustor Utility Demonstration. Fourth Quarterly progress report, August 1989--October 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-31

    The TRW Advanced Slagging Coal Combustor Demonstration Project consists of retrofitting Orange and Rockland (O&R) Utility Corporation`s Lovett Plant Unit No. 3 with four (4) slagging combustors which will allow the gas/ou desip unit to fire 2.5 sulfur coal. The slogging combustor process will provide NO{sub x} and SO{sub x} emissions that meet NSPS and New York State Envirommental Standards. TRW-CBU scope of work includes the engineering, design and supply of the slogging combustors, coal and limestone feed systems and a control system for these components. During this report period, the design activities for all systems progressed to permit the release of specifications and requests for proposals. Award of contracts for long-delivery items and major equipment are being placed to meet the revised program schedule.

  18. Coal gasification. Quarterly report, January-March 1979. [US DOE supported

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-01-01

    Progress in DOE-supported coal gasification pilot plant projects is reported: company, location, contract number, funding, process description, history and progress in the current quarter. Two support projects are discussed: preparation of a technical data book and mathematical modeling of gasification reactors. (LTN)

  19. Texas Experimental Tokamak, a plasma research facility: Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Wootton, A.J.

    1995-08-01

    In the year just past, the authors made major progress in understanding turbulence and transport in both core and edge. Development of the capability for turbulence measurements throughout the poloidal cross section and intelligent consideration of the observed asymmetries, played a critical role in this work. In their confinement studies, a limited plasma with strong, H-mode-like characteristics serendipitously appeared and received extensive study though a diverted H-mode remains elusive. In the plasma edge, they appear to be close to isolating a turbulence drive mechanism. These are major advances of benefit to the community at large, and they followed from incremental improvements in diagnostics, in the interpretation of the diagnostics, and in TEXT itself. Their general philosophy is that the understanding of plasma physics must be part of any intelligent fusion program, and that basic experimental research is the most important part of any such program. The work here demonstrates a continuing dedication to the problems of plasma transport which continue to plague the community and are an impediment to the design of future devices. They expect to show here that they approach this problem consistently, systematically, and effectively.

  20. Coal materials handling: classifier evaluation. Quarterly progress report, October-December 1980

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, R.S.C.

    1980-01-01

    The desire and need to reduce energy requirements is, of course, the first and foremost reason for seeking a better understanding of the role of classification in closed circuit coal grinding. A better understanding of classifiers typically used in conjunction with coal grinding circuits would result in the ability to better utilize energies expended in coal grinding. In addition, the ability to better control the product size distribution is of major importance to many new processes being introduced to our energy conscious economy. Such processes include coal-oil mixture production, the production of coal-water slurries of pipelines, coal gasification and the production of solvent refined coal. All of these processes call for the use of pumpable and high concentrate slurries. In all cases the particle size distribution has a direct effect on the pumpability and percent by weight solids concentration that is reasonably attainable. Recognizing the need for a better technical understanding of classifiers used in coal grinding, the United States Department of Energy and the Kennedy Van Saun Corporation conceived the present project to evaluate various classifiers currently being used in air swept coal grinding systems. The classifiers under consideration include a twin cone classifier, an expansion chamber type (vari-mesh) classifier and a new centrifugal classifier recently introduced by Hukki. The objectives of this evaluation are to compare the classifiers with respect to their effect on closed circuit grinding system performance and to provide data that will allow a preliminary evaluation of classifier design with respect to separation on the basis of sulfur and ash content.

  1. Technical Assistance Paper: Third-Grade Student Progression. DPS: 2013-56

    Science.gov (United States)

    Florida Department of Education, 2013

    2013-01-01

    The purpose of this Technical Assistance Paper (TAP) is to provide school districts with updates and changes relative to third-grade student progression policies, including information on alternative assessments, promotion criteria and resources. This paper provides: (1) General Information; (2) Student Portfolios for Third-Grade Students; (3)…

  2. FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT MAY 1969

    Energy Technology Data Exchange (ETDEWEB)

    Astley, E. R.; Cabell, C. P.

    1969-06-06

    This report was prepared by Battelle-Northwest under Contract No. AT(45-1)-1830 for the Atomic Energy Commission, Division of Reactor Development and Technology, to summarize technical progress made in the Fast Flux Test Facility Program during May 1969 .

  3. FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT SEPTEMBER 1969

    Energy Technology Data Exchange (ETDEWEB)

    Astely, E. R.; Cabell, C. P.

    1969-10-07

    This report was prepared by Battelle-Northwest under Contract No. AT(45-1)-1830 for the Atomic Energy Commission, Division of Reactor Development and Technology, to summarize technical progress made in the Fast Flux Test Facility Program during September 1969.

  4. Technical Adequacy and Acceptability of Curriculum-Based Measurement and the Measures of Academic Progress

    Science.gov (United States)

    January, Stacy-Ann A.; Ardoin, Scott P.

    2015-01-01

    Curriculum-based measurement in reading (CBM-R) and the Measures of Academic Progress (MAP) are assessment tools widely employed for universal screening in schools. Although a large body of research supports the validity of CBM-R, limited empirical evidence exists supporting the technical adequacy of MAP or the acceptability of either measure for…

  5. FAST FLUX TEST FACILITY MONTHLY INFORMAL TECHNICAL PROGRESS REPORT FEBRUARY 1969

    Energy Technology Data Exchange (ETDEWEB)

    Astley, E. R.

    1969-03-07

    This report was prepared by Battelle-Northwest under Contract No. AT (45-1)-1830 for the Atomic Energy Commission, Division of Reactor Development and Technology, to summarize technical progress made in the Fast Flux Test Facility Program during February 1969.

  6. Cassini RTG Program. Monthly technical progress report, 27 November--31 December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-24

    This monthly technical progress report provided information on the following tasks: spacecraft integration and liaison; engineering support; safety analysis; qualified unicouple fabrication; ETG fabrication, assembly, and test; ground support equipment (GSE); RTG shipping and launch support; designs, reviews, and mission applications; project management, quality assurance, and reliability, and contractor acquired government owned (CAGO) property acquisition.

  7. Nuclear-waste-management. Quarterly progress report, July-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    Chikalla, T.D.; Powell, J.A. (comps.)

    1981-12-01

    Progress reports and summaries are presented for the following: high-level waste process development, alternate waste forms; TMI zeolite vitrification demonstration program; nuclear waste materials characterization center; TRU waste immobilization; TRU waste decontamination; krypton implantation; thermal outgassing; iodine-129 fixation; NWVP off-gas analysis; monitoring and physical characterization of unsaturated zone transport; well-logging instrumentation development; verification instrument development; mobility of organic complexes of radionuclides in soils; handbook of methods to decrease the generation of low-level waste; waste management system studies; waste management safety studies; assessment of effectiveness of geologic isolation systems; waste/rock interactions technology program; high-level waste form preparation; development of backfill materials; development of structural engineered barriers; disposal charge analysis; analysis of spent fuel policy implementation; spent fuel and fuel pool component integrity program; analysis of postulated criticality events in a storage array of spent LWR fuel; asphalt emulsion sealing of uranium mill tailings; liner evaluation for uranium mill tailings; multilayer barriers for sealing uranium tailings; application of long-term chemical biobarriers for uranium tailings; and revegetation of inactive uranium tailings sites.

  8. Nuclear-waste-management. Quarterly progress report, July-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    Chikalla, T.D.; Powell, J.A. (comps.)

    1981-12-01

    Progress reports and summaries are presented for the following: high-level waste process development, alternate waste forms; TMI zeolite vitrification demonstration program; nuclear waste materials characterization center; TRU waste immobilization; TRU waste decontamination; krypton implantation; thermal outgassing; iodine-129 fixation; NWVP off-gas analysis; monitoring and physical characterization of unsaturated zone transport; well-logging instrumentation development; verification instrument development; mobility of organic complexes of radionuclides in soils; handbook of methods to decrease the generation of low-level waste; waste management system studies; waste management safety studies; assessment of effectiveness of geologic isolation systems; waste/rock interactions technology program; high-level waste form preparation; development of backfill materials; development of structural engineered barriers; disposal charge analysis; analysis of spent fuel policy implementation; spent fuel and fuel pool component integrity program; analysis of postulated criticality events in a storage array of spent LWR fuel; asphalt emulsion sealing of uranium mill tailings; liner evaluation for uranium mill tailings; multilayer barriers for sealing uranium tailings; application of long-term chemical biobarriers for uranium tailings; and revegetation of inactive uranium tailings sites.

  9. Development of superior asphalt recycling agency: Phase 1, Technical feasibility. Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Bullin, J.A.; Glover, C.J.; Davison, R.R.; Lin, Moon-Sun; Chaffin, J.; Liu, Meng; Eckhardt, C.

    1996-04-01

    About every 12 years, asphalt roads must be reworked, and this is usually done by placing thick layers (hot-mix overlays) of new material on top of failed material, resulting in considerable waste of material and use of new asphalt binder. A good recycling agent is needed, not only to reduce the viscosity of the aged material but also to restore compatibility. Objective is to establish the technical feasibility (Phase I) of determining the specifications and operating parameters for producing high quality recycling agents which will allow most/all the old asphalt-based road material to be recycled. It is expected that supercritical fractionation can be used. The advanced road aging simulation procedure will be used to study aging of blends of old asphalt and recycling agents.

  10. Advanced physical coal cleaning to comply with potential air toxic regulations. [Quarterly] technical report, September 1--November 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Honaker, R.Q.; Paul, B.C.; Wang, D. [Southern Illinois Univ., Carbondale, IL (United States). Dept. of Mining Engineering

    1994-12-31

    This research project will investigate the use of advanced fine coal cleaning technologies for cleaning PCB feed as a compliance strategy. Trace elements considered in this project will include mercury, selenium, cadmium, and chlorine. Work in the first quarter has focused on trace element analysis procedures and sample acquisition. Several experts in the field of trace element analysis of coal have been consulted and these procedures are presently being evaluated.

  11. Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report for July through September 1994 (Fourth quarter of fiscal year 1994)

    Energy Technology Data Exchange (ETDEWEB)

    Kiser, D.M.; Brown, H.L.

    1995-03-01

    The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the US. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned, except for two Griffon vans. The Mission Statement of the Site Operator Program includes three major activities: advancement of electric vehicle technologies; development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. The ultimate thrust of program activities varies among sites, reflecting not only the Operator`s business interests but also geographic and climate-related operating conditions. This fourth quarter report (FY-94) includes a summary of activities from the previous three quarters. The report section sequence has been revised to provide a more easily seen program overview, and specific operator activities are now found in Appendix A.

  12. Low-Cost Solar-Array Project. Quarterly progress report, April-June 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The overall objective of the LSA Silicon Material Task is to establish a chemical process for producing silicon at a rate and price commensurate with the production goals of the LSA project for solar-cell modules. As part of the overall Silicon Material Task, Union Carbide developed the silane-silicon process and advanced the technology to the point where it has a definite potential for providing high-purity polysilicon on a commercial scale at a price of $14/kg by 1986 (1980 dollars). This work, completed under Phases I and II of the contract, provided a firm base for the Phase III Program (initiated in April 1979) aimed at establishing the practicality of the process by pursuing the following specific objectives: (1) design, fabricate, install, and operate an Experimental Process System Development Unit (EPSDU) sized for 100 MT/yr to obtain extensive performance data to establish the data base for the design of commercial facilities; (2) perform support research and development to provide an information base usable for the EPSDU and for technological design and economic analysis for potential scale-up of the process; and (3) perform iterative economic analyses of the estimated product cost for the production of semiconductor-grade silicon in a facility capable of producing 1000 MT/yr. This process for preparing semiconductor-grade silicon in the EPSDU from metallurgical-grade (M-G) silicon is based on a well-integrated arrangement of purification steps that provides a cost-effective process system. The three basic steps entail converting M-G silicon to trichlorosilane, redistributing the trichlorosilane to produce silane, and thermally decomposing the silane to form amorphous silicon powder. The powder is then melted and the molten silicon is cast to polycrystalline for subsequent use in fabricating solar cells. Progress is reported in detail. (WHK)

  13. Chemical Engineering Division fuel cycle programs. Quarterly progress report, July-September 1978

    Energy Technology Data Exchange (ETDEWEB)

    Steindler, M.J.; Ader, M.; Barletta, R.E.

    1980-01-01

    Fuel cycle work included hydraulic performance and extraction efficiency of eight-stage centrifugal contactors, flowsheet for the Aralex process, Ru and Zr extraction in a miniature centrifugal contactor, study of Zr aging in the organic phase and its effect on Zr extraction and hydraulic testing of the 9-cm-ID contactor. Work for predicting accident consequences in LWR fuel processing covered the relation between energy input (to subdivide a solid) and the modes of particle size frequency distribution. In the pyrochemical and dry processing program corrosion-testing materials for containment vessels and equipment for studying carbide reactions in bismuth is under way. Analytical studies have been made of salt-transport processes; efforts to spin tungsten crucibles 13 cm dia continue, and other information on tungsten fabrication is being assembled; the process steps of the chloride volatility process have been demonstrated and the thoria powder product used to produce oxide pellets; solubility of UO/sub 2/, PuO/sub 2/, and fission products in molten alkali nitrates is being investigated; work was continued on reprocessing actinide oxides by extracting the actinides into ammonium chloroaluminate from bismuth; the preparation of thorium-uranium carbide from the oxide is being studied as a means of improving the oxide reactivity; studies are in progress on producing uranium metal and decontaminated ThO/sub 2/ by the reaction of (Th,U)O/sub 2/ solid solution in molten salts containing ThCl/sub 4/ and thorium metal chips. In the molten tin process, no basic thermodynamic or kinetic factors have been found that may limit process development.

  14. Professional technical support services for the Mining Equipment Test Facility. First annual technical progress report, April 14-September 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Garson, R C

    1981-10-01

    The Department of Energy recently began the operation of its Mining Equipment Test Facility. One component at that facility is the highly sophisticated Mine Roof Simulator (MRS) for research and development of roof support equipment. Because of its previous experience, the University of Pittsburgh was contracted to assist the Facilities Manager by providing professional technical support services, principally for the MRS. This technical progress report briefly describes the services provided during the reporting period and planned for the next period. No significant technical disclosures of interest to those not associated with the MRS are contained herein. One of the four units of the US government-owned METF is the Mine Roof Simulator. This unique $10 million test facility was designed to simulate underground mine roof loads and motions. The MRS is a hybrid, analog-digital, computer-controlled, closed-loop, electro-hydraulic, research device capable of applying either loads or displacements in the vertical and one horizontal axis. Its vertical capacity of 3,000,000 pounds can be applied over its 20 by 20 foot active test area. The horizontal load capacity is 1,600,000 pounds. It can simulate coal seam heights of up to 16 feet. Automatic data acquisition and real time display are provided. The most modern, sophisticated technology was used in its design and construction.

  15. PREFACE: Scientific and Technical Challenges in the Well Drilling Progress

    Science.gov (United States)

    2015-02-01

    departments - Technologies in Mineral Exploration and Technologies in Mineral Exploration were merged into one department. In 2003 the newly merged Department of Drilling was established within the Institute of Petroleum Engineering, now the Institute of Natural Resources and is located in Building № 6 where it began its life. During these 60 years more than 3000 specialists have graduated the Department of Drilling, many whom are highly-qualified and dedicated professionals. There is no doubt that this Conference involved comprehensive advanced engineering problems in drilling and issues on relevant personnel training. It is extremely important to understand how the 60-year progress and contribution in the field of drilling has left its trace in the history of this Department; and, that, now, it is necessary to move further and seek new and new horizons in drilling.

  16. Government Information Quarterly. Volume 7, no. 2: National Aeronautics and Space Administration Scientific and Technical Information Programs. Special issue

    Science.gov (United States)

    Hernon, Peter (Editor); Mcclure, Charles R. (Editor); Pinelli, Thomas E. (Editor)

    1990-01-01

    NASA scientific and technical information (STI) programs are discussed. Topics include management of information in a research and development agency, the new space and Earth science information systems at NASA's archive, scientific and technical information management, and technology transfer of NASA aerospace technology to other industries.

  17. Appraisement on Contributive Ratio of Scientific and Technical Progresses in Milk Productive Enterprises by Model C2GS2

    Institute of Scientific and Technical Information of China (English)

    SUN Futian; SUN Liqun; YANG Guanglin

    2008-01-01

    Scientific and technical progress has been the driving forces of enterprises development. Milk productive enterprises are developing faster and growing better. It is very important to measure the contributive ratio of scientific and technical progress in milk productive enterprises. And the appraisement could help to develop milk productive enterprises. The model C2GS2 was established to appraise the contributive ratio of scientific and technical progress in milk productive enterprises in the research. And the appraisement on the contributive ratio of scientific and technical progress in milk productive enterprises was made by the model. In the results of appraisement, science and technology play a main role in milk productive enterprises. It is shown that our milk productive enterprises are developed by scientific and technical progress while not by input of productive factors.

  18. Coal-fired high performance power generating system. Quarterly progress report, October 1, 1994--December 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This report covers work carried out under Task 3, Preliminary R and D, under contract DE-AC22-92PC91155, {open_quotes}Engineering Development of a Coal-Fired High Performance Power Generation System{close_quotes} between DOE Pittsburgh Energy Technology Center and United Technologies Research Center. The goals of the program are to develop a coal-fired high performance power generation system (HIPPS) by the year 2000 that is capable of (1) > 47% thermal efficiency; (2) NO{sub x}, SO{sub x} and particulates {<=}25% NSPS; (3) cost {>=}65% of heat input; (4) all solid wastes benign. In our design consideration, we have tried to render all waste streams benign and if possible convert them to a commercial product. It appears that vitrified slag has commercial values. If the flyash is reinjected through the furnace, along with the dry bottom ash, then the amount of the less valuable solid waste stream (ash) can be minimized. A limitation on this procedure arises if it results in the buildup of toxic metal concentrations in either the slag, the flyash or other APCD components. We have assembled analytical tools to describe the progress of specific toxic metals in our system. The outline of the analytical procedure is presented in the first section of this report. The strengths and corrosion resistance of five candidate refractories have been studied in this quarter. Some of the results are presented and compared for selected preparation conditions (mixing, drying time and drying temperatures). A 100 hour pilot-scale stagging combustor test of the prototype radiant panel is being planned. Several potential refractory brick materials are under review and five will be selected for the first 100 hour test. The design of the prototype panel is presented along with some of the test requirements.

  19. Examining the Technical Adequacy of Second-Grade Reading Comprehension Measures in a Progress Monitoring Assessment System. Technical Report # 08-08

    Science.gov (United States)

    Alonzo, Julie; Liu, Kimy; Tindal, Gerald

    2008-01-01

    This technical report describes the development of reading comprehension assessments designed for use as progress monitoring measures appropriate for 2nd Grade students. The creation, piloting, and technical adequacy of the measures are presented. The following are appended: (1) Item Specifications for MC [Multiple Choice] Comprehension - Passage…

  20. Quarterly Progress Report for the Chemical and Energy Research Section of the Chemical Technology Division: July-September 1999

    Energy Technology Data Exchange (ETDEWEB)

    Jubin, R.T.

    2001-04-16

    This report summarizes the major activities conducted in the Chemical and Energy Research Section of the Chemical Technology Division at Oak Ridge National Laboratory (ORNL) during the period July-September 1999. The section conducts basic and applied research and development in chemical engineering, applied chemistry, and bioprocessing, with an emphasis on energy-driven technologies and advanced chemical separations for nuclear and waste applications. The report describes the various tasks performed within ten major areas of research: Hot Cell Operations, Process Chemistry, Molten Salt Reactor Experiment (MSRE) Remediation Studies, Chemistry Research, Physical Properties Research, Biochemical Engineering, Separations and Materials Synthesis, Fluid Structures and Properties, Biotechnology Research, and Molecular Studies. The name of a technical contact is included with each task described, and readers are encouraged to contact these individuals if they need additional information. Activities conducted within the area of the Cell Operations involved the testing of two continuously stirred tank reactors in series to evaluate the Savannah River-developed process of small-tank tetraphenylborate precipitation to remove cesium, strontium and transuranics from supernatant. Within the area of Process Chemistry, various topics related to solids formation in process solutions from caustic treatment of Hanford sludge were addressed. Saltcake dissolution efforts continued, including the development of a predictive algorithm. New initiatives for the section included modeling activities centered on detection of hydrogen in {sup 233}U storage wells and wax formation in petroleum mixtures, as well as support for the Spallation Neutron Source (investigation of transmutation products formed during operation). Other activities involved in situ grouting and evaluation of options for use (i.e., as castable shapes) of depleted uranium. In a continuation of activities of the preceding

  1. Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 4

    Energy Technology Data Exchange (ETDEWEB)

    Ulm, Franz-Josef

    2000-06-30

    OAK-B135 Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 4. The analysis of the effect of cracks on the acceleration of the calcium leaching process of cement-based materials has been pursued. During the last period (Technical Progress Report No 3), we have introduced a modeling accounting for the high diffusivity of fractures in comparison with the weak solid material diffusivity. It has been shown through dimensional and asymptotic analysis that small fractures do not significantly accelerate the material aging process. This important result for the overall structural aging kinetics of containment structure has been developed in a paper submitted to the international journal ''Transport in Porous Media''.

  2. Cassini RTG Program monthly technical progress report, July 28--August 24, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-24

    The technical progress achieved during this period is described. This report is organized by program task structure: (1) spacecraft and integration liaison; (2) engineering support; (3) safety; (4) qualified unicouple production; (5) ETG fabrication, assembly, and test; (6) ground support equipment (GSE); (7) RTG shipping and launch support; (8) designs, reviews, and mission applications; (9) project management, quality assurance, reliability, contract changes, CAGO acquisition (operating funds), and CAGO maintenance and repair; and (10) CAGO acquisition (capital funds).

  3. TERTIARY ECONOMIC ACTIVITIES UNDER THE IMPACT OF SCIENTIFIC AND TECHNICAL PROGRESS IN ROMANIA

    Directory of Open Access Journals (Sweden)

    PAUL-BOGDAN ZAMFIR

    2015-06-01

    Full Text Available The scientific and technical progress put its mark in a different manner on all activities that occur within contemporary economy and it was present in the entire evolution of human society, but its implications and effects were never so strong and extensive. There is no area of activity in which progress not to interfere, both as important mutations that they are happening in the all area of production factors, as well as the place and role of the human factor in the deployment of production processes. In the current period the progress has exceeded certain human limits, operating in other areas which until more now it seems unattainable by the achievements of new technology. In this paradigm are successfully integrated tertiary activities in which the scientific and technical progress entered with great difficulty.Nowadays we are witnessing spectacular evolutions whether we talk about movement of goods, education, research, health, transportation, arts and culture, etc. The purpose of this paper is to determine the degree in which scientific and technical progress. In this paper we proposed to determine the level in which the scientific and technical progress, had a decisive impact on the development of the tertiary sector in general and in Romania in particular , we shall specify which are the economic tertiary activities that adapt fast to new changes occurred in the system of informational society. In this context we have to mention the systems of intelligent transport, electronic governance, medical system based on ICT online educational systems, as a possible response of the tertiary sector to the adaptation of technological progress benefits. In the first part of this paper we focused on the conceptual delimitation of scientific concepts at which we refer often such as: technological progress and innovative services which inevitably determine the evolution of tertiary sector under the impact of new modern technologies. On this background

  4. Removal of CO{sub 2} from flue gases by algae. [Quarterly] technical report, March 1, 1993--May 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Akin, C.; Pradhan, S. [Inst. of Gas Technology, Chicago, IL (United States)

    1993-09-01

    The objective of this research program is to determine the feasibility of the alga Botryococcus braunii as a biocatalyst for the photosynthetic conversion of flue gas CO{sub 2} to hydrocarbons. The research program involves the determination of the biocatalytic characteristics of free and immobilized cultures of Botryococcus braunii in bench-scale studies, and the feasibility study and economic analysis of the Botryococcus braunii culture systems for the conversion of flue gas CO{sub 2} to hydrocarbons. The objective of the third quarter of this research program was to determine the growth and hydrogen formation characteristics of free and immobilized cells of Botryococcus braunii in bench-scale photobioreactors. Raceway and inclined surface type bioreactors were used for free cell and immobilized cell studies respectively. The free cell studies with air and CO{sub 2} enriched air [10% (v/v) CO{sub 2} in air] in media with and without NaHCO{sub 3} were conducted.

  5. BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1980-03-20

    During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

  6. National Institute for Petroleum and Energy Research quarterly technical report, April 1--June 30, 1992. Volume 2, Energy production research

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Progress reports are presented for: chemical flooding--supporting research; gas displacement-supporting research; thermal recovery-supporting research; geoscience technology; resource assessment technology; and microbial technology. (AT)

  7. NRC TLD Direct Radiation Monitoring Network. Volume 15, No. 4: Quarterly progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    Struckmeyer, R.

    1996-03-01

    This report presents the results of the NRC Direct Radiation Monitoring Network for the fourth quarter of 1995. It provides the ambient radiation levels measured in the vicinity of 75 sites throughout the United States. In addition, it describes the equipment used, monitoring station selection criteria, characterization of the dosimeter response, calibration procedures, statistical methods, intercomparison, and quality assurance program.

  8. Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

  9. Configurational diffusion of asphaltenes in fresh and aged catalyst extrudates. Quarterly progress report, June 20, 1995--September 20, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Guin, J.A.

    1996-01-01

    The objective of this research is to determine the relationship between the size and shape of coal and petroleum macromolecules and their diffusion rates i.e., effective diffusivities, in catalyst pore structures. This quarter, three petroleum and two coal asphaltenes were prepared from petroleum asphalts and coal derived solids separately by solvent extraction.

  10. Underground gasification for steeply dipping coal beds: Phase III. Quarterly progress report, April 1-June 30, 1981. [Rawlins Test 2

    Energy Technology Data Exchange (ETDEWEB)

    1981-12-01

    Preparations are being made for the August start-up of Rawlins Test 2. Site construction activities began May 4 with the mobilization of the construction subcontractor. The drilling program was completed this quarter with the installation of instrumentation wells. The Experimental Basis Document, PGA Operating Manual, and DAS Operating Manual have also been completed.

  11. National Institute for Petroleum and Energy Research quarterly technical report, January 1--March 31, 1993. Volume 2, Energy production research

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    Accomplishments for the past quarter are briefly described for the following tasks: chemical flooding -- supporting research; gas displacement -- supporting research; thermal recovery -- supporting research; geoscience technology; resource assessment technology; and microbial technology. Chemical flooding covers: surfactant flooding methods; development of improved alkaline flooding methods; mobility control and sweep improvement in chemical flooding; and surfactant-enhanced alkaline flooding field project. Gas displacement covers: gas flooding performance prediction improvement; and mobility control, profile modification and sweep improvement in gas flooding. Thermal recovery includes: thermal processes for light oil recovery; thermal processes for heavy oil recovery; and feasibility study of heavy oil recovery in the mid-continent region -- Oklahoma, Kansas, and Missouri; simulation analysis of steam-foam projects; and field application of foams for oil production symposium. Geoscience technology covers: three-phase relative permeability; and imaging techniques applied to the study of fluids in porous media. Resource assessment technology includes: reservoir assessment and characterization; TORIS research support; upgrade the BPO crude oil analysis data base; and compilation and analysis of outcrop data from the Muddy and Almond Formations. Microbial technology covers development of improved microbial flooding methods; and microbial-enhanced waterflooding field project.

  12. Sulfur removal in advanced two-stage fluidized-bed combustion. [Quarterly] technical report, December 1, 1993--February 28, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Abbasian, J.; Hill, A.H.; Wangerow, J.R.; Rue, D.M. [Inst. of Gas Technology, Chicago, IL (United States)

    1994-06-01

    The objective of this study is to obtain data on the rates of reaction between, hydrogen sulfide (H{sub 2}S) and uncalcined calcium-based sorbents under operating conditions relevant to first stage (carbonizer) of Advanced Two-Stage Pressurized Fluidized-Bed Combustors (PFBC). In these systems the CO{sub 2} partial pressure in the first stage generally exceeds the equilibrium value for calcium carbonate decomposition. Therefore, removal of sulfur compounds takes place through the reaction between H{sub 2}S and calcium carbonate. To achieve this objective the rates of reaction between hydrogen sulfide and uncalcined calcium-based sorbents will be determined by conducting tests in pressurized thermogravimetric analyzer (TGA) and high-pressure/high-temperature fluidized-bed reactor (HPTR) units. The effects of sorbent type, sorbent particle size, reactor temperature and pressure, and CO{sub 2} and H{sub 2}S partial pressures on the sulfidation reaction rate will be determined. During this quarter, the high-pressure thermogravimetric analyzer (HPTGA) unit was installed and the shakedown process was completed. Several tests were conducted in the HPTGA unit to establish the operating procedure and the repeatability of the experimental results. Sulfidation by conducting the baseline sulfidation tests. The results are currently being analyzed.

  13. Evaluation of geothermal energy in Arizona. Arizona geothermal planning/commercialization team. Quarterly topical progress report, July 1-September 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    White, D.H.; Mancini, F.; Goldstone, L.A.; Malysa, L.

    1980-01-01

    Progress is reviewed on the following: area development plans, evaluation of geothermal applications, continued evaluation of geothermal resources, engineering and economic analyses, technical assistance in the state of Arizona, the impact of various growth patterns upon geothermal energy development, and the outreach program. (MHR)

  14. Basalt Waste Isolation Project. Quarterly report, July 1, 1980-September 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1980-11-01

    This report presents the technical progress for the Basalt Waste Isolation Project for the fourth quarter of fiscal year 1980. The overall Basalt Waste Isolation Project is divided into the following principal work areas: systems integration; geosciences; hydrology; engineered barriers; near-surface test facility; engineering testing; and repository studies. Summaries of major accomplishments for each of these areas are reported.

  15. DOE/FETC GASIS project. Quarterly report, September 1--November 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This report summarizes technical progress on the GASIS [Gas AtlaS Information System] project during the quarter. During this period, work was performed on Task 3: Natural gas reservoir data system development, Task 4: Technology transfer, Task 8: Reservoir data system updates, and Task 9: Supplemental reservoir studies.

  16. Kaldor’s ‘technical progress function’ and Verdoorn’s law revisited

    OpenAIRE

    McCombie, John S. L.; Spreafico, Marta R. M.

    2015-01-01

    This is the accepted manuscript of a paper published in the Cambridge Journal of Economics (McCombie JSL, Spreafico MRM, Cambridge Journal of Economics, 2015, doi:10.1093/cje/bev030). The final version is available at http://dx.doi.org/10.1093/cje/bev030 Kaldor put forward his technical progress function as an alternative to the neoclassical aggregate production function. It is shown that Verdoorn?s law is its empirical counterpart, although allowing for increasing returns to scale. Howeve...

  17. Monthly technical progress report, 29 January 1996--25 Februray 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This report discusses the technical progress made on the radioisotope thermoelectric generators and ancillary activities for the Cassini space probe mission to the planet Saturn. The probe is designated for launch in October of 1997. This report covers the project reporting period from 29 January 1996 through 25 February 1996. The report is organized by program task structure and includes activities for: spacecraft integration and liason; engineering support; safety; qualified unicouple production; ETG fabrication, assembly, and testing; RTG shipping and launch support; designs, reviews and mission applications; quality assurance, reliability and contract changes; and CAGO acquisition.

  18. Enforcement actions: Significant actions resolved. Volume 14, No. 2, Part 1: Individual actions. Quarterly progress report, April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1995) and includes copies of Orders sent by the Nuclear Regulatory Commission to individuals with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC. The Commission believes this information may be useful to licensees in making employment decisions.

  19. LMFBR (LIQUID METAL FAST BREEDER REACTOR) READTION RATE AND DOSIMETRY 3RD QUARTERLY PROGRESS REPORT DECEMBER 1971 JANUARY FEBRUARY 1972

    Energy Technology Data Exchange (ETDEWEB)

    MCELROY WN

    1972-03-01

    This report was compiled at the Hanford Engineering Development Laboratory operated by Westinghouse Hanford Company, a subsidiary of Westinghouse Electric Corporation, for the United States Atomic Energy Commission, Division of Reactor Development and Technology, under Contract No. AT (45-1) 2170. It describes technical progress made in the Interlaboratory LMFBR Reaction Rate Program during the reporting period. The Interlaboratory LMFBR Reaction Rate (ILRR) program has been established by USAEC/RDT to develop a capability to accurately measure neutron-induced reaction rates for LMFBR fuels and materials development programs. The initial goal for the principal fission reactions, {sup 235}U, {sup 238}U, and {sup 239}Pu, is an accuracy to within {+-}5 at the 95% confidence level. Accurate measurement of other fission and non-fission reactions will be required, but to a lesser accuracy, between {+-}5 to 10% at the 95% confidence level. A secondary program objective is improvement in knowledge of the nuclear parameters involved in fuels and materials dosimetry measurements of neutron flux, spectra, fluence, and burnup. These accuracy goals for the ILRR program are severe; measurements of fast-neutron-induced reaction rates have not been rapidly moving toward this level of precision. Using a number of techniques in well established neutron environments of current interest for fast reactor development and critically evaluating the results will help establish existing levels of accuracy and indicate the scale of effort required for improvement. To accomplish the objectives of this program, reliable and documented experimental values of reaction rates and ratios will be determined for various well established and permanent neutron fields. The Coupled Fast Reactivity Measurement Facility (CFRMF) at Aerojet Nuclear Company (ANC) is the first neutron field being studied because of the similarity of its spectrum to that of a fast reactor and the range and reproducibility of

  20. Enforcement actions: Significant actions resolved material licensees (non-medical). Quarterly progress report, October 1994--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October - December 1994) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to material licensees (non-medical) with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  1. Enforcement actions: Significant actions resolved reactor licensees. Quarterly progress report, October--December 1994, Volume 13, No. 4, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (October--December 1994) and includes copies of letters Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  2. Enforcement actions: Significant actions resolved medical licensees. Quarterly progress report, January 1995--March 1995. Volume 14, No. 1, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (January-March 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to medical licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  3. Enforcement actions: Significant actions resolved reactor licensees. Volume 14, No. 2, Part 2, Quarterly progress report, April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This compilation summarizes significant enforcement actions that have been resolved during one quarterly period (April--June 1995) and includes copies of letters, Notices, and Orders sent by the Nuclear Regulatory Commission to reactor licensees with respect to these enforcement actions. It is anticipated that the information in this publication will be widely disseminated to managers and employees engaged in activities licensed by the NRC, so that actions can be taken to improve safety by avoiding future violations similar to those described in this publication.

  4. Separation of flue-gas scrubber sludge into marketable products. Fourth year, first quarterly technical progress report, September 1, 1996--December 31, 1996 (Quarter No. 13)

    Energy Technology Data Exchange (ETDEWEB)

    Kawatra, S.K.; Eisele, T.C.

    1996-12-01

    To reduce their sulfur emissions, many coal-fired electric power plants use wet flue-gas scrubbers. These scrubbers convert sulfur oxides into solid sulfate and sulfite sludge, which must then be disposed of. This sludge is a result of reacting limestone with sulfur dioxide to precipitate calcium sulfite and calcium sulfate. It consists of calcium sulfite (CaSO{sub 3}{circ}0.5H{sub 2}O), gypsum (CaSO{sub 4}{circ}2H{sub 2}O), and unreacted limestone (CaCO{sub 3}) or lime (Ca(OH)2), with miscellaneous objectionable impurities such as iron oxides, silicates, and magnesium, sodium, and potassium oxides or salts. These impurities prevent many sludges from being utilized as a replacement for natural gypsum, and as a result they must be disposed of in landfills, which presents a serious disposal problem. Knowledge of scrubber sludge characteristics is necessary for the development of purification technologies which will make it possible to directly utilize scrubber sludges rather than landfilling them. This project is studying the use of minimal-reagent froth flotation as the purification process, using the surface properties of the particles of unreacted limestone to remove them and their associated impurities from the material, leaving a purified calcium sulfite/gypsum product.

  5. Separation of flue-gas scrubber sludge into marketable products. Second quarterly technical progress report, December 1, 1993--February 28, 1994 (Quarter No. 2)

    Energy Technology Data Exchange (ETDEWEB)

    Kawatra, S.K.; Eisele, T.C.

    1994-03-01

    To reduce their sulfur emissions, many coal-fired electric power plants use wet flue-gas scrubbers. These scrubbers convert sulfur oxides into solid sulfate and sulfite sludge, which must then be disposed of This sludge is a result of reacting limestone with sulfur dioxide to precipitate calcium sulfite and calcium sulfate. It consists of calcium sulfite (CaSO{sub 3}{lg_bullet}0.5H{sub 2}0), gypsum (CaSO{sub 4}{lg_bullet}2H{sub 2}0), and unreacted limestone (CaCO{sub 3}) or lime (Ca(OH){sub 2}), with miscellaneous objectionable impurities such as iron oxides; silica; and magnesium, sodium, and potassium oxides or salts. Currently, the only market for scrubber sludge is for manufacture of gypsum products, such as wallboard and plaster, and for cement. However, the quality of the raw sludge is often not high enough or consistent enough to satisfy manufacturers, and so the material is difficult to sell. This project is developing a process that can produce a high-quality calcium sulfite or gypsum product while keeping process costs low enough that the material produced will be competitive with that from other, more conventional sources. This purification will consist of minimal-reagent froth flotation, using the surface properties of the particles of unreacted limestone to remove them and their associated impurities from the material, leaving a purified gypsum or calcium sulfite product. The separated limestone will be a useful by-product, as it can be recycled to the scrubber, thus boosting the limestone utilization and improving process efficiency. Calcium sulfite will then be oxidized to gypsum, or separated as a salable product in its own right from sludges where it is present in sufficient quantity. The main product of the process will be either gypsum or calcium sulfite, depending on the characteristics of the sludge being processed. These products will be sufficiently pure to be easily marketed, rather that being landfilled.

  6. Separation of flue-gas scrubber sludge into marketable products. Second year, fourth quarterly technical progress report, Quarter No. 8, June 1, 1995--August 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Kawatra, S.K.; Eisele, T.C.

    1995-09-01

    To reduce their sulfur emissions, many coal-fired electric power plants use wet flue-gas scrubbers. These scrubbers convert sulfur oxides into solid sulfate and sulfite sludge, which must then be disposed of. This sludge is a result of reacting limestone with sulfur dioxide to precipitate calcium sulfite and calcium sulfate. It consists of calcium sulfite (CaSO{sub 3}{sm_bullet}0.5H{sub 2}O), gypsum (CaSO{sub 4}{sm_bullet}2H{sub 2}O), and unreacted limestone (CaCO{sub 3}) or lime (Ca(OH){sub 2}), with miscellaneous objectionable impurities such as iron oxides, silica, and magnesium, sodium, and potassium oxides or salts. These impurities prevent many sludges from being utilized as a replacement for natural gypsum, and as a result they must be disposed of in landfills, which presents a serious disposal problem. Knowledge of scrubber sludge characteristics is necessary for the development of purification technologies which will make it possible to directly utilize scrubber sludges rather than landfilling them. This project is studying the use of minimal-reagent froth flotation as the purification process, using the surface properties of the particles of unreacted limestone to remove them and their associated impurities from the material, leaving a purified calcium sulfite/gypsum product.

  7. Separation of flue-gas scrubber sludge into marketable products. Third year, first quarterly technical progress report Quarter No. 9, September 1, 1995--November 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Kawatra, S.K.; Eisele, T.C.

    1995-12-01

    To reduce their sulfur emissions, many coal-fired electric power plants use wet flue-gas scrubbers. These scrubbers convert sulfur oxides into solid sulfate and sulfite sludge, which must then be disposed of This sludge is a result of reacting limestone with sulfur dioxide to precipitate calcium sulfite and calcium sulfate. It consists of calcium sulfite (CaSO{sub 3}{center_dot}0.5H{sub 2}O), gypsum (CaSO{sub 4}{center_dot}2H{sub 2}O), and unreacted limestone (CaCO{sub 3}) or lime (Ca(OH){sub 2}), with miscellaneous objectionable impurities such as iron oxides, silicates, and magnesium, sodium, and potassium oxides or salts. These impurities prevent many sludges from being utilized as a replacement for natural gypsum, and as a result they must be disposed of in landfills, which presents a serious disposal problem. Knowledge of scrubber sludge characteristics is necessary for the development of purification technologies which will make it possible to directly utilize scrubber sludges rather than landfilling them. This project is studying the use of minimal-reagent froth flotation as the purification process, using the surface properties of the particles of unreacted limestone to remove them and their associated impurities from the material, leaving a purified calcium sulfite/gypsum product.

  8. Environmental Hazards Assessment Program. Quarterly report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-04

    The objectives of the EHAP program are to: Develop a holistic, national basis for risk assessment, risk management and risk communication; Develop a pool of talented scientists and experts in cleanup activities, especially in human health aspects, and; Identify needs and develop programs addressing the critical shortage of well-educated, highly-skilled technical and scientific personnel to address the health oriented aspects of environmental restoration and waste management. This report describes activities and reports on progress for the third quarter of year two (January-March, 1994) of the grant. To better accomplish objectives, grant efforts are organized into three major elements: The Crossroads of Humanity Series; Research, Science and Education Programs; and Program Management. The Crossroads of Humanity Series charted a new course, incorporating lessons learned during previous quarters into a series of programs designed to address environmental issues in a real world setting. Reports are included on the various research programs with milestones and deliverables from the third quarter.

  9. High temperature membranes for H{sub 2}S and SO{sub 2} separations. Quarterly progress report, July 1, 1992--September 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Winnick, J.

    1992-12-31

    High temperature membrane separation techniques have been applied to gas mixtures involved in coal utilization. For coal gasification, H{sub 2}S has been removed from the syn-gas stream, split into hydrogen which enriches the syn-gas, and sulfur which can be condensed from an inert gas sweep stream. For coal combustion, SO{sub 2} has been separated from the flue gas, with concentrated SO{sub 3} produced as a by-product. Both processes appear economically viable but each requires fundamental improvements: both the H{sub 2}S cell and the SO{sub 2} cell require more efficient membranes and the H{sub 2}S cell needs a more efficient anode. Membranes will be fabricated by either hot-pressing, impregnation of sintered bodies, or tape casting. Research conducted during the present quarter is highlighted, with an emphasis on progress towards these goals.

  10. MHD air heater technology development. Annual technical progress report, January 1, 1980-December 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-03-01

    Progress on the technology development of the directly-fired high temperature air heater (HTAH) for MHD power plants is described in detail. The objective of task 1 is to continue development of ceramic materials technology for the directly-fired HTAH. The objectives of task 2 are to demonstrate the technical feasibility of operating a directly-fired HTAH (including both the heater matrix and valves), to continue obtaining information on life and corrosion resistance of HTAH materials, and to obtain design information for full-scale studies and future design work. The objectives of task 3 are to begin the identification of HTAH control requirements and control system needs, and to continue full-scale study efforts incorporating updated materials and design information in order to identify development needs for the HTAH development program. (WHK)

  11. Solar heating and hot water system for the central administrative office facility. Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    1978-11-01

    Progress on the solar heating and hot water system for the central administrative office facility of the Lincoln Housing Authority, Lincoln, NE is covered. An acceptance test plan is presented and the results of the test are tabulated. A complete blueprint of the system as built is provided. The monitoring system is drawn and settings and installation are described. An operation and maintenance manual discusses procedures for start up, shut down and seasonal changeover and include a valve list and pictures and specifications of components and materials used. Photographs of the final installation are included, and technical data and performance data are given. Finally, there is a brief description of system design and operation and a discussion of major maintenance problems encountered and their solutions. (LEW)

  12. Energy conservation in citrus processing. Technical progress report, October 1, 1979-March 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-15

    The principal objective of the work is to identify an economically viable alternative to the existing method of meeting the energy requirements of citrus fruit processing that will substantially reduce the overall energy usage of citrus processing plants. The components which will make up the alternative systems include: evaporators, dryers, refrigeration units, heat pumps, heat engines, heat exchangers, thermal storage units, and ancillary components. These components will be used to form the five operational units of the citrus processing plant. These operational units are: evaporation, drying, refrigeration, pasteurizing and canning, and the plant electrical load that consists of operations such as conveying and juice extraction. The five operational units are then interrelated to varying degrees with respect to energy exchange to form different types of alternative systems. The approach, work plan, and progress of technical work are summarized. (MCW)

  13. Energy conservation in citrus processing. Technical progress report, October 1, 1979-March 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-15

    The Sunkist Citrus Plant in Ontario, California, processes about 6 million pounds of citrus fruit per day to make products which include frozen concentrated juice; chilled, pasteurized, natural strength juice; molasses from peel; dried meal from peel; pectin; citrus oil; and bioflavonoids. The energy intensive operations at the plant include concentration, drying, and refrigeration. The objective of the two-year two-phase project is to identify an economically viable alternative to the existing method of meeting energy requirements. Progress on the technical work of Phase I is reported. The following are summarized: requirements (energy price projection, atmospheric emission requirements, citrus juice quality constraints, economic evaluations); characterization (basic citrus processing operations, energy consumption and fruit processed vs time, identification and measurement of energy uses, energy balance for a typical citrus juice evaporator); and thermodynamic analysis (heat pump model, thermal evaporator, and co-generation model).

  14. Spray forming -- Aluminum: Third annual report (Phase 2). Technical progress -- Summary

    Energy Technology Data Exchange (ETDEWEB)

    Kozarek, R.L.

    1998-04-20

    Commercial production of aluminum sheet and plate by spray atomization and deposition is a potentially attractive manufacturing alternative to conventional ingot metallurgy/hot-milling and to continuous casting processes because of reduced energy requirements and reduced cost. To realize the full potential of the technology, the Aluminum Company of America (Alcoa), under contract by the US Department of Energy, is investigating currently available state-of-the-art atomization devices to develop nozzle design concepts whose spray characteristics are tailored for continuous sheet production. This third technical progress report will summarize research and development work conducted during the period 1997 October through 1998 March. Included are the latest optimization work on the Alcoa III nozzle, results of spray forming runs with 6111 aluminum alloy and preliminary rolling trials of 6111 deposits.

  15. Providing solutions to energy and environmental problems. Quarterly technical progress report, July 1, 1997--September 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    1997-10-01

    The Jointly Sponsored Research Program emphasizes technology commercialization and continues to be highly successful and supported strongly and enthusiastically by WRI`s industrial clientele. All of the available Department of Energy (USDOE) funding for each of the first seven years has been committed to projects. This report provides a description of projects and expenditures on fossil projects and environmental monitoring.

  16. Superacid Catalyzed Coal Conversion Chemistry. 1st and 2nd Quarterly Technical Progress Reports, September 1, 1983-March 30, 1984.

    Science.gov (United States)

    Olah, G. A.

    1984-01-01

    In our laboratories we have previously developed a mild coal conversion process. This involves the use of a superacid system consisting of HF and BF{sub 3} in presence of hydrogen and/or a hydrogen donor solvent. In order to understand the chemistry involved in the process of depolymerization of coal by the HF:BF{sub 3}:H{sub 2} system we are carrying out a systematic study of a number of coal model compounds. The model compounds selected for present study have two benzene rings connected with various bridging units such as alkylidene, ether, sulfide etc. From studies so far carried out it appears that high pyridine extractibilities achieved by treating coal at temperature below 100 degrees C results from the cleavage of bridges such as present in bibenzyl, diphenyl methane, dibenzyl ether, dibenzyl sulfide etc. On the other hand the increased cyclohexane extractibility and distillability observed at relatively higher temperatures and hydrogen pressures reflects the hydrogenation and cleavage of the aromatic backbone in coal structure similar to what is seen in the conversion of model compounds such as biphenyl, diphenyl ether, diphenyl sulfide, anthracene, etc.

  17. Advanced liquefaction using coal swelling and catalyst dispersion techniques. Quarterly technical progress report, July--September 1992

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, C.W. [Auburn Univ., AL (United States); Gutterman, C. [Foster Wheeler Development Corp., Livingston, NJ (United States); Chander, S. [Pennsylvania State Univ., University Park, PA (United States)

    1992-12-31

    The experimental study of coal swelling ratios have been determined with a wide variety of solvents. Only marginal levels of coal swelling were observed for the hydrocarbon solvents, but high levels were found with solvents having heteroatom functionality. Blends were superior to pure solvents. The activity of various catalyst precursors for pyrene hydrogenation and coal conversion was measured. Higher coal conversions were observed for the S0{sub 2}-treated coal than the raw coal, regardless of catalyst type. Coal conversions were highest for Molyvan-L, molybdenum naphthenate, and nickel octoate, respectively. Bottoms processing consists of a combination of the ASCOT process coupling solvent deasphalting with delayed coking. Initial results indicate that a blend of butane and pentane used near the critical temperature of butane is the best solvent blend for producing a yield/temperature relationship of proper sensitivity and yet retaining an asphalt phase of reasonable viscosity. The literature concerning coal swelling, both alone and in combination with coal liquefaction, and the use of dispersed or unsupported catalysts in coal liquefaction has been updated.

  18. Isobutanol-methanol mixtures from synthesis gas. Quarterly technical progress report, 1 April--30 June 30 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-25

    A series of CuMgCeO{sub x} catalysts have been prepared by coprecipitating the corresponding metal nitrates with a mixed solution of potassium carbonate and potassium hydroxide. Kinetic studies of methanol and ethanol coupling reactions on K-Cu/MgO/CeO{sub 2} and MgO/CeO{sub 2} catalysts indicate that Cu enhances the rates of alcohol dehydrogenation. The cross-coupling reactions of acetaldehyde and {sup 13}C-labeled methanol produce singly-labeled propionaldehyde, suggesting that it forms by the condensation of acetaldehyde and a reactive intermediate derived from methanol. Isobutyraldehyde, a precursor to isobutanol, forms via the condensation of propionaldehyde and a reactive C{sub 1} intermediate resulting from methanol. CO{sub 2}, one of the reaction products, poisons both basic and metal sites on Ce-containing CuMgO{sub x} catalysts, resulting in decreases in the rates of both alcohol dehydrogenation (Cu sites) and chain-growth condensation reactions (basic sites). CO{sub 2} inhibits ethanol dehydrogenation on both low-Cu and high-Cu CuMgCeO{sub x} catalysts; however, CO{sub 2} has no effect on the activity of low-Cu Ce-free Cu-MgO{sub x} catalysts, suggesting that the Cu on CuMgCeO{sub x} catalysts is more likely to be oxidized by CO{sub 2} to Cu{sup +} species that can be subsequently stabilized by CeO{sub 2}. CO{sub 2} effects on high-pressure isobutanol synthesis from CO/H{sub 2} have been studied on low- and high-Cu CuMgCeO{sub x} catalysts at 320{degrees}C and 4.5 MPa. CO{sub 2} addition and removal on low- and high-Cu catalysts show similar directional effects on CO conversion. CO conversion is lower at all space velocities in the presence of CO{sub 2}, and removal Of CO{sub 2} from the feed partially recovers CO conversion. CO{sub 2} decreases methanol and isobutanol productivities on both catalysts. Addition of 1-propanol to CO/H{sub 2} feed increases isobutanol production, suggesting that 1-propanol is a precursor to isobutanol.

  19. Heterogeneous catalytic process for alcohol fuels from syngas. Fifteenth quarterly technical progress report, July--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The principal objectives of this project are to discover and evaluate novel heterogeneous catalysts for conversion of syngas to oxygenates having use as fuel enhancers, to explore novel reactor and process concepts applicable in this process, and to develop the best total process for converting syngas to liquid fuels. The previous best catalysts consisted of potassium-promoted Pd on a Zn/Cr spinel oxide prepared via controlled pH precipitation. The authors have now examined the effect of cesium addition to the Zn/Cr spinel oxide support. Surprisingly, cesium levels required for optimum performance are similar to those for potassium on a wt% basis. The addition of 3 wt% cesium gives isobutanol rates > 170 g/kg-hr at 440 C and 1,500 psi with selectivity to total alcohols of 77% and with a methanol/isobutanol mole ratio of 1.4: this performance is as good as their best Pd/K catalyst. The addition of both cesium and palladium to a Zn/Cr spinel oxide support gives further performance improvements. The 5 wt% cesium, 5.9 wt% Pd formulation gives isobutanol rates > 150 g/kg-hr at 440 C and only 1,000 psi with a selectivity to total alcohols of 88% and with a methanol/isobutanol mole ratio of 0.58: this is their best overall performance to date. The addition of both cesium and palladium to a Zn/Cr/Mn spinel oxide support that contains excess Zn has also been examined. This spinel was the support used in the synthesis of 10-DAN-54, the benchmark catalyst. Formulations made on this support show a lower overall total alcohol rate than those using the spinel without Mn present, and require less cesium for optimal performance.

  20. Heterogeneous catalytic process for alcohol fuels from syngas. Sixteenth quarterly technical progress report, October--December, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    The principal objectives of this project are to discover and evaluate novel heterogeneous catalysts for conversion of syngas to oxygenates having use as fuel enhancers, to explore novel reactor and process concepts applicable in this process, and to develop the best total process for converting syngas to liquid fuels. Among our previous best catalysts was the family consisting of potassium-promoted Pd on a Zn/Cr spinel oxide prepared via controlled pH precipitation. We have now examined the effect of potassium promotion on (1) a Zn/Cr/O spinel and (2) on ZnO; these two individual components are used together to make our best support. The presence of excess zinc oxide has a beneficial effect on the performance of Zn/Cr spinel oxide catalysts (1) promoted with cesium and (2) promoted with both cesium and palladium. The presence of the excess zinc oxide results in a more active and selective catalyst to total alcohols and increased isobutanol rates, demonstrating the effectiveness of zinc oxide addition to the spinel support. Potassium addition promotes higher alcohol synthesis on a commercial Zn/Cr spinel oxide methanol synthesis catalyst. Incremental potassium levels (1, 3 and 5 wt%) result in an increase in total alcohol selectivity, while isobutanol. rates are maximized at 1 wt% potassium. The commercial catalyst promoted with potassium is slightly less active for isobutanol synthesis and less selective to total alcohols when compared with our spinel formulation promoted with potassium and containing excess ZnO. Surface science studies have shown that the surface of these catalysts is predominately ZnO and alkali. With use, the ZnO is reduced to Zn metal, and Cr migrates to the surface giving increased surface acidity. In addition tends to lower the overall acidity. Hydrogen can be observed on the catalyst surface by surface science studies. Hydrogen on the active catalyst is associated with the palladium.

  1. Heterogeneous catalytic process for alcohol fuels from syngas. Fourteenth quarterly technical progress report, April--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The project objectives are: (1) To discover, study, and evaluate novel heterogeneous catalytic systems for the production of oxygenated fuel enhancers from synthesis gas. In particular, novel heterogeneous catalysts will be studied and optimized for the production of: (a) C{sub 1}-C{sub 5} alcohols using conventional methanol synthesis conditions, and (b) methanol and isobutanol mixtures which may be used for the downstream synthesis of MTBE or related oxygenates. (2) To explore, analytically and on the bench scale, novel reactor and process concepts for use in converting syngas to liquid fuel products. (3) To develop on the bench scale the best combination of chemistry, catalyst, reactor, and total process configuration to achieve the minimum product cost for the conversion of syngas to liquid products. The authors have prepared a comparative Zn/Cr spinel oxide support that contains excess ZnO and have looked at the catalytic performance of (a) the bare support, (b) a potassium traverse on the bare support to determine the effect of alkali addition in the absence of Pd and (c) a potassium traverse on the support impregnated with 6 wt% Pd. The bare support is an inefficient methanol catalyst. Alkali addition results in an increase in selectivity to total alcohols vs. the bare support and a dramatic increase higher alcohol synthesis. Pd addition results in further improvements in performance. Selectivities increase with K loading. The 5 wt% K, 5.9 wt% Pd catalyst produces > 100 g/kg-hr of isobutanol at 440 C and 1,000 psi, with 85% selectivity to total alcohols and with a methanol/isobutanol mole ratio of <2. The authors intend to continue formulation screening using K/Pd formulations on ZnO and ZnCr{sub 2}O{sub 4} prepared conventionally and via controlled pH precipitation. They will also examine the effect of Cs in place of K as the alkali promoter and the use of Rh instead of Pd as a promoter.

  2. A novel coal feeder for production of low sulfur fuel. Quarterly technical progress report, December 1, 1989--April 1, 1990

    Energy Technology Data Exchange (ETDEWEB)

    Keener, T.C.; Khang, S.J.; Yu, X.L.

    1990-12-31

    A novel coal feeding system is currently undergoing testing and evaluation at the University of Cincinnati. The system consists primarily of an auger feed tube which is used to both convey and provide desulfurization of a high sulfur coal feedstock. The coal is conveyed at temperatures ranging from 350 to 550 {degrees}C and under normal atmospheric pressure. Under these mild processing conditions, the coal partially pyrolizes and emits sulfur in the form of hydrogen sulfide while maintaining a relatively high heating value in the char product. The evolved gases are evacuated from the reactor (the feed tube) to another absorbing bed where H{sub 2}S reacts with the sorbent, usually lime or limestone. The resultant sorbent utilization is substantially higher than the values found in current dry scrubbing system and the produced low-sulfur char may then be used in a conventional steam boiler.

  3. Technology development for cobalt F-T catalysts. Quarterly technical progress report No. 5, October 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Singleton, A.H.

    1994-05-31

    The goal of this project is the development of a commercially viable, cobalt-based Fischer-Tropsch (F-T) catalyst for use in a slurry bubble column reactor. Cobalt-based catalysts have long been known as being active for F-T synthesis. They typically possess greater activity than iron-based catalysts, historically the predominant catalyst being used commercially for the conversion of syngas based on coal, but possess two disadvantages that somewhat lessen its value: (1) cobalt tends to make more methane than iron does, and (2) cobalt is less versatile with low H{sub 2}/CO ratio syngas due to its lack of water-gas shift activity. Therefore, the major objectives of this work are (1) to develop a cobalt-based F-T catalyst with low (< 5 %) methane selectivity, (2) to develop a cobalt-based F-T catalyst with water-gas shift activity, and (3) to combine both these improvements into one catalyst. It will be demonstrated that these catalysts have the desired activity, selectivity, and life, and can be made reproducibly. Following this experimental work, a design and a cost estimate will be prepared for a plant to produce sufficient quantities of catalyst for scale-up studies.

  4. Photovoltaic mechanisms in polycrystalline thin film solar cells. Quarterly technical progress report No. 3, April 1-June 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Storti, G.; Johnson, S.; Lin, H.C.; Armstrong, R.W.

    1979-01-01

    The vertical junction effect in polysilicon solar cells (due to dopant penetration along grain boundaries) is investigated using a cylindrical grain model. The model shows that for small grain radii the short circuit current can increase above the single crystal value if the grain boundaries collect carriers and that th short-circuit current approaches the single crystal value as the grain size increases. The spatial dependence of the dark I-V characteristic is investigated by fabricating small diodes on a polysilicon wafer. Dark I-V characteristics are measured and illuminated characteristics are projected for each of the diodes. The diode characteristics are given together with SEM micrographs of the diodes and the effect of areal inhomogemety is investigated. The relative orientations of adjacent crystal grains and the nature of the boundaries between grains are studied by x-ray diffraction, optical microscopy and SEM methods. Orientation data is presented along with electron channelling patterns obtained from individual grains. A conclusion is drawn on the origin of sinuous grain boundaries.

  5. Ocean Thermal Energy Conversion (OTEC) power system development conceptual design. First quarterly technical progress report, August 1-December 31, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Trimble, L. C.; Robidart, C. M.

    1978-01-01

    The Power System Development Project, Phase I, is to develop conceptual and preliminary designs utilizing state-of-the-art heat exchanger concepts for (1) the full sized (25 MWe nominal) closed-cycle ammonia power system module for the 100 MWe demonstration plant; and (2) the scaled 5 MWe (nominal) proof-of-concept power system and the 1 MWe heat exchangers (evaporator and condenser), representative of the 25 MWe design. The major issues for conceptual design are: heat exchanger thermal size and material, tube water-side fouling countermeasures, heat transfer enhancement technique, power system module power output size and availability and reliability, internal/external module configurations, and busbar power cost. The salient findings are given.

  6. Technical Division quarterly progress report, October 1--December 31, 1977. [Fuel cycle research and development; special materials production

    Energy Technology Data Exchange (ETDEWEB)

    Slansky, C.M. (ed.)

    1978-02-01

    Results are presented on the fluidized-bed calcination of simulated radioactive waste from the reprocessing of spent commercial nuclear fuel and on the removal of actinide elements from the waste prior to calcination. Other programs include the development of storage technology for /sup 85/Kr waste; and the behavior of volatile radionuclides during the combustion of HTGR graphite-based fuel. The long-term management of defense waste from the ICPP covers post-calcination treatment of ICPP calcined waste; the removal of actinide elements from first-cycle raffinate; the retrieval and handling of calcined waste from ICPP storage vaults; and the preparation of the Programmatic Environmental Impact Statement on ICPP waste. Process improvements are reported on the Fluorinel headend process for Zircaloy-clad fuels and on uranium accountability measurements. Other development results cover the process for recovering spent Rover fuel, buried pipeline transfer systems, support to the Waste Management Program, Waste Calcining Facility support, New Waste Calcining Facility support, and effluent monitoring methods evaluation and development. In this category are studies on nuclear materials security, application of a liquid-solid fluidized-bed heat exchanger to the recovery of geothermal heat, inplant reactor source term measurements, burnup methods for fast breeder reactor fuels, absolute thermal fission yield measurements, analytical support to light water breeder reactor development, research on analytical methods, and the behavior of environmental species of iodine.

  7. Evaluation of hyperbaric filtration for fine coal dewatering. Fourth quarterly technical progress report: June 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Parekh, B.K. [Univ. of Kentucky, Lexington, KY (United States); Hogg, R. [Pennsylvania State Univ., University Park, PA (United States); Fonseca, A. [CONSOL Inc., Library, PA (United States)

    1993-12-31

    The main objectives of the project are to investigate the fundamental aspects of particle-liquid interaction in fine coal dewatering, to conduct laboratory and pilot plant studies on the applicability of hyperbaric filter systems and to develop process conditions for dewatering of fine clean coal to less than 20 percent moisture. The program consist of three phases, Model Development, Laboratory Studies, and Field Testing. The Pennsylvania State University is leading efforts in Phase 1, the University of Kentucky in Phase 2, and Consol Inc. in Phase 3 of the program. All three organizations are involved in all the three phases of the program. The Pennsylvania State University is developing a theoretical model for hyperbaric filtration systems, whereas the University of Kentucky is conducting experimental studies to investigate fundamental aspects of particle-liquid interaction and application of high pressure filter in fine coal dewatering. The optimum filtration conditions identified in phase 1 and 2 will be tested in a Consol Inc. coal preparation plant using an Andritz Ruthner portable hyperbaric filtration unit.

  8. Fischer-Tropsch synthesis in supercritical fluids. Quarterly technical progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Akgerman, A.; Bukur, D.B. [Texas A and M Univ., College Station, TX (United States). Dept. of Chemical Engineering

    1996-12-31

    For the task on diffusion coefficients of F-T products in supercritical fluids, we attempted to find a model for the {beta} parameter to predict the molecular diffusion coefficients to a high degree of accuracy so we may be able to predict both the molecular diffusion coefficient and thus the effective diffusivity a priori. The dependency of solvent/solute interactions on the {beta} parameter was analyzed and a correlation developed to predict the functionality. This allowed us to develop an empirical formula to correlate the molecular diffusion coefficient to ratios of mass, size, and density. Thus finally allowing for supercritical fluid diffusion predictions a priori. Figure 6 shows our predictions of the data available on the self diffusion coefficient of carbon dioxide (Chen, 1983; Takahashi and Iwasaki, 1966) ethylene (Arends et al., 1981; Baker et al., 1984), toluene (Baker et al., 1985) and chlorotrifuoromethane (Harris, 1978). The predictions, with no parameters adjusted from the data, are excellent with an average absolute error of 3.64%.

  9. Instrumental methods of analysis of sulfur compounds in synfuel process streams. Quarterly technical progress report, October-December 1983

    Energy Technology Data Exchange (ETDEWEB)

    Jordan, J.; Sexton, E.; Talbott, J.; Yakupkovic, J.

    1984-01-01

    Task 1. Methods development for the speciation of the polysulfides. The contributions of this project to the electrochemical analysis of sulfides and polysulfides are reviewed and summarized. Electrochemical reduction at the dropping mercury electrode (DME) is the method of choice for the determination of polysulfidic sulfur. Total sulfidic sulfur can conveniently be quantitated in mixtures of sulfides and polysulfides, by measuring diffusion currents engendered by the anodic depolarization of the DME in the presence of the moieties HS/sup -/ and S/sub x//sup 2 -/. Task 2. Methods development for the speciation of dithionite and polythionates. In a solvent consisting of 40% ethanol-60% water, electrocapillary curves substantiated the adsorption of ethanol at the dropping mercury electrode. The potentials where adsorption occurred paralleled a shift of 1 volt in the polarographic half potential of the reaction: S/sub 4/O/sub 6//sup 2 -/ + 2e = 2S/sub 2/O/sub 3//sup 2 -/. Task 3. Total accounting of the sulfur balance in representative samples of synfuel process streams. Two H-Coal liquefaction sour water samples were analyzed representing different stages in the PETC clean-up procedures. One specimen was a sample stripped of H/sub 2/S and ammonia; the other, resulting from a different batch, was stripped and subsequently extracted with methyl isobutyl ketone. The stripped effluent contained less than 0.001 M concentrations of sulfide, polysulfide, thiosulfate, and sulfate. On the other hand, sulfate accounted for 90% of the total sulfur present in the stripped and extracted sample; the remainder consisted of sulfidic and polysulfidic sulfur as well as thiosulfate. 13 references, 2 figures, 3 tables.

  10. Hydrocarbons associated with brines from geopressured wells. Second Quarterly technical progress report, 1 April 1991--30 June 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-15

    The purpose of this research is to determine the concentration of the cryocondensates in fluids of the various USDOE Geopressured wells as a function of production volume. The wells are visited each month that they are operating and samples are to be taken cryogenically during each visit. A gas scrubbing system will continuously samples the gas streams of the wells in the intervals between visit. Collectors, exchanged daily by site personnel, are retrieved on each visit.

  11. Hydrocarbons associated with brines from geopressured wells. Third quarterly technical progress report, 1 July 1991--30 September 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-15

    Efforts to determine the concentration of the cryocondensates in fluids of the various USDOE Geopressured wells a function of production volume. The wells are visited monthly as they are operating and samples are reported taken cryogenically during each visit. A gas scrubbing system continuously sample the gas streams of the wells in the intergas scrubbing system continuously sample the gas streams of the wells in the intervals between visit. Results obtained are to correlated the production of the collected compounds with reservoir and well production characteristics.

  12. Assistance to the states with risk based data management. Quarterly technical progress report, January 1, 1995--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report describes activities associated with the risk based data management systems (RBDMS) project. The RBDMS applies to data pertaining to injection well operations. This report describes assistance provided to the states of ALaska, Mississippi, Montana, and Nebraska for the conversion of data from existing data management systems, coding and internal testing of the RBDMS, document preparation, training, technology transfer, and project management.

  13. Heterogeneous catalytic process for alcohol fuels from syngas. Sixth quarterly technical progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    The principal objectives of this project are to discover and evaluate novel heterogeneous catalysts for conversion of syngas to oxygenates having use as fuel enhancers, to explore novel reactor and process concepts applicable in this process, and to develop the best total process for converting syngas to liquid fuels. The project is being pursued as two concurrent tasks. Task 1 involves catalyst research and development and is being largely conducted by catalyst chemists and analytical specialists. Task 2 is largely an engineering activity, and includes process conceptualization and economics and bench-scale process evaluation of systems developed in Task 1. Our current targets for isobutanol-producing catalysts are to produce a 50/50 split in selectivity between methanol and iso-butanol, a productivity for isobutanol of >50 g/Kg-hr and an overall process conversion of 40%. We have continued to study how preparation variables affect the catalysts` chemical and physical properties.

  14. Enhanced durability and reactivity for zinc ferrite desulfurization sorbent. Quarterly technical progress report 8, July--September 1988

    Energy Technology Data Exchange (ETDEWEB)

    Jha, M.C.; Berggren, M.H.

    1988-11-14

    AMAX Research & Development Center (AMAX R&D) has been investigating methods for enhancing the reactivity and durability of the zinc ferrite desulfurization sorbent. Zinc ferrite sorbents are intended for use in desulfurization of hot coal gas in integrated gasification combined cycle (IGCC) or molten carbonate fuel cell (MCFC) applications. For the present program, the reactivity of the sorbent may be defined as its sulfur sorption capacity at the breakthrough point and at saturation in a bench-scale, fixed-bed reactor. Durability may be defined as the ability of the sorbent to maintain important physical characteristics such As size, strength, and specific surface area during 10 cycles of sulfidation and oxidation.

  15. Development of precipitated iron Fischer-Tropsch catalysts. Quarterly technical progress report, 1 July 1995--30 September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Bukur, D.B.

    1995-12-20

    The following accomplishments were made on task 4. Reproducibility of Catalyst Preparation: (1) Five slurry reactor tests were completed. Three tests were conducted using catalyst C (100 Fe/3 Cu/4 K/16 SiO{sub 2}) from three different batches (runs SB-2695, SB-2145 and SA-2715), and two tests were conducted with catalyst B (100 Fe/5 Cu/6 K/24 SiO{sub 2}) from two different preparation batches (runs SA-2615 and SB-2585). Performance of catalysts from different batches (activity, selectivity and deactivation rates) was similar to that of catalysts from the original batch (synthesized during DOE Contract DE- AC22-89PC89868). Thus, another major objective of the present contract, demonstration of reproducibility of catalyst preparation procedure and performance, has been accomplished. With these tests the work on Task 4 has been successfully completed. Two fixed bed reactor tests of catalysts B and C synthesized using potassium silicate solution as the source of potassium promoter were completed during this period (Task 5. The Effect of Source of Potassium and Basic Oxide Promoter). Activity of catalysts prepared using potassium silicate as the source of potassium promotion was somewhat higher, and their methane selectivities were higher than those of the corresponding catalysts prepared by incipient wetness impregnation using KHCO{sub 3} as the source of potassium promoter. However, these differences were not large, and may have been caused by experimental artifacts (e.g. existence of local hot spots in a reactor). A slurry reactor test (SA-2405) of catalyst with nominal composition 100 Fe/5 Cu/2 Ca/24 SiO{sub 2} was completed (Task 5). In general, the catalyst activity, space-time-yield, and hydrocarbon selectivities in this run during testing at:260{degrees}C, 2.17 MPa (300 psig), 2-2.6 Nl/g-cat/h and H{sub 2}CO=0.67 were quite good, and comparable to the best results obtained in our Laboratory.

  16. Effects of surface chemistry on the porous structure of coal. Quarterly technical progress report, October 1996--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, S.A.; Hatcher, P.G.; Radovic, L.R.

    1997-01-01

    Selective presaturation and saturation transfer {sup 129}Xe NMR experiments were performed on a high volatile C bituminous coal and an anthracite. The experiments detect the movement of xenon atoms among different regions of the internal surface, and to the external surface of the coal particles. The results indicate that adsorbed xenon atoms can move to the external surface of the bituminous coal significantly faster than in the anthracite. The results are interpreted in terms of the porous structure of the coals.

  17. Determination of optimum electrolyte composition for molten carbonate fuel cells. Quarterly technical progress report, October--December 1987

    Energy Technology Data Exchange (ETDEWEB)

    Yuh, C.Y.; Pigeaud, A.

    1987-12-31

    The goal of this program is the development of a molten carbonate fuel cell (MCFC) anode which is more tolerant of sulfur contaminants in the fuel than the current state-of-the-art nickel-based anode structures. This program addresses two different but related aspects of the sulfur contamination problem. The primary aspect is concerned with the development of a sulfur tolerant electrocatalyst for the fuel oxidation reaction. A secondary issue is the development of a sulfur tolerant water-gas-shift reaction catalyst and an investigation of potential steam reforming catalysts which also have some sulfur tolerant capabilities. These two aspects are being addressed as two separate tasks.

  18. Preconversion catalytic deoxygenation of phenolic functional groups. Quarterly technical progress report, April 1, 1991--June 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Kubiak, C.P.

    1991-12-31

    The deoxygenation of phenols is a conceptually simple, but unusually difficult chemical transformation to achieve. Aryl carbon-oxygen bond cleavage is a chemical transformation of importance in coal liquefaction and the upgrading of coal liquids as well as in the synthesis of natural products. This proposed research offers the possibility of effecting the selective catalytic deoxygenation of phenolic functional groups using CO. A program of research for the catalytic deoxygenation of phenols, via a low energy mechanistic pathway that is based on the use of the CO/CO{sub 2} couple to remove phenolic oxygen atoms, is underway. We are focusing on systems which have significant promise as catalysts: Ir(triphos)OPh, [Pt(triphos)OPh]{sup +} and Rh(triphos)OPh. Our studies of phenol deoxygenation focus on monitoring the reactions for the elementary processes upon which catalytic activity will depend: CO insertion into M-OPh bonds, CO{sub 2} elimination from aryloxy carbonyls {l_brace}M-C(O)-O-Ph{r_brace}, followed by formation of a coordinated benzyne intermediate.

  19. Preconversion catalytic deoxygenation of phenolic functional groups. Quarterly technical progress report, January 1, 1992--March 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Kubiak, C.P.

    1992-08-01

    The deoxygenation of phenols is a conceptually simple, but unusually difficult chemical transformation to achieve. The phenolic C-O bond energy of 103 kcal/mol is as strong as a benzene C-H bond and over a 10 kcal/mol stronger than the C-O bonds of methanol and ethanol. The consequence of this is that the hydrogenation/deoxygenation methods in current use require severe conditions and give low selectivities. The ongoing research described herein is based on the unprecedented, but thermodynamically promising, use of carbon monoxide as the oxygen atom acceptor for the catalytic deoxygenation of phenols.

  20. Evaluation, engineering and development of advanced cyclone processes. Quarterly technical progress report No. 4, July 1, 1991--September 30, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    ``Evaluation, Engineering and Development of Advanced Cyclone Processes`` is a research and development project for the reduction of pyritic sulfur in coal. Project goals are to remove 80 to 90% of the ash and pyritic sulfur while retaining 80 to 90% of the parent coal`s heating value. A number of media and media separator options are to be evaluated and tested, culminating with the implementation of the preferred combination in a 1,000 lb/hr bench-scale process optimization circuit.

  1. Key contributions in MHD power generation. Quarterly technical progress report, 1 December 1979-29 February 1980

    Energy Technology Data Exchange (ETDEWEB)

    Louis, J.F.

    1980-09-01

    A separate entry was made in the data base for reports on each of the four tasks: (1) arcing phenomena in MHD generators; (2) open cycle MHD disk generator program; (3) electrode module development and testing; and (4) coal combustion studies. (WHK)

  2. Preconversion catalytic deoxygenation of phenolic functional groups. Quarterly technical progress report, April 1, 1995--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Kubiak, C.P.

    1996-01-01

    The complex, [Rh(triphos)CO] [PF{sub 6}] [triphos = bis(2-diphenylphosphinoethyl)phenyl phosphine], 4, has been reacted with a series of aryloxides, ROH [R = C{sub 6}H{sub 5}, C{sub 6}H{sub 4}-p-CH{sub 3}, C{sub 6}H{sub 4}-p-OCH{sub 3}]. The resulting aryloxycarbonyl complexes are observable by FTIR spectroscopy. These rhodium aryloxycarbonyl complexes decay to form Rh(triphos)OR, 1-3, or [Rh(triphos)CO]PF{sub 6}, 4, through the fac- and mer-isomers of Rh(triphos)(CO)OR. These reactions were followed by FT-IR, {sup 31}P({sup 1}H)VT-NMR, under reaction conditions where carbon monoxide both could and could not escape. The conditions under which the carbon monoxide could not escape enabled the observation of [Rh(triphos)(CO){sub 2}] 5, by {sup 31}P ({sup 1H}) NMR and FT-IR.

  3. Preconversion catalytic deoxygenation of phenolic functional groups. Quarterly technical progress report, April 1, 1992--June 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Kubiak, C.P.

    1992-11-01

    Aryl carbon-oxygen bond cleavage is a chemical transformation of importance in coal liquefaction and the upgrading of coal liquids as well as in the synthesis of natural products. There have been numerous attempts to discover general methods for the cleavage of aryl carbon-oxygen bonds. All the stoichiometric organic methods for phenol deoxygenation have limited applications and involve expensive reagents. Catalytic method, for the hydrodeoxygenation (HDO) of phenols involve supported transition metal oxides, such as Mo/{gamma}-Al{sub 2}O{sub 3}, Ni-MO/{gamma}-Al{sub 2}O{sub 3}, Co-Mo/{gamma}-Al{sub 2}O{sub 3}, and Fe{sub 2}O{sub 3}/SiO{sub 2}. Typical phenol hydrodeoxygenation conditions involve hydrogen pressures in excess of 100 atm and temperatures in excess of 200{degrees}C. Under these conditions arene ring hydrogenation is generally found to compete with phenol deoxygenation; and the coproduct water is found to impair the activity of the catalysts. This proposed research offers the possibility of effecting the selective catalytic deoxygenation of phenolic functional groups using CO. The deoxygenation of phenols by carbon monoxide mediated by Ir(triphos)OAr has provided us with a catalytic Phenol deoxygenation pathway, through the elimination of CO{sub 2} and formation of a benzyne intermediate. Although the [Pt(triphos)(O-Ph-Me)]PF{sub 6} system is not expected to be as efficient a catalyst as some of the other transition metals systems we are currently exploring, it will provide more information about the deoxygenation mechanism in these triphos complexes. This is due to the presence of the structurally sensitive {sup 3l}P--{sup 195}Pt coupling constant and comparisons to the extensively studied Pt(dppe)(O-Ph){sub 2} systems.

  4. High octane ethers from synthesis gas-derived alcohols. Quarterly technical progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Klier, K.; Herman, R.G.; Menszak, J.; Johansson, M.A.; Feeley, O.C.; Kim, D.

    1993-07-01

    The results shown in Figures 10 and 11 demonstrate that the formation of butenes was very sensitive to the alcohol partial pressure. A small elevation of the alcohol pressure suppressed the formation of butenes rather drastically at both 90 and 117{degree}C. The synthesis rates of DME, MIBE, and MTBE ethers were not significantly affected at 90{degree}C, although there was a trend to increase the space time yield of DME as the alcohol pressure was increased. At the reaction temperature of 117{degree}C, all of the ethers showed increasing productivities as the pressure of the reactants was increased (Figure 11). An isotope labelling experiment was carried out to provide mechanistic insight into the manner in which methanol and isobutanol react together to form DME, MIBE, and MTBE ethers and to determine if MTBE were derived from MIBE.

  5. Isobutanol-methanol mixtures from synthesis gas. Quarterly technical progress report, October 1, 1996--December 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    A series of MgO-based Cu catalysts have been prepared by coprecipitating the corresponding metal nitrates with a mixed solution of potassium carbonate and potassium hydroxide. The bulk composition of the catalyst has been measured by atomic absorption (AA) analysis and the Cu dispersion has been determined by N{sub 2}O titration at 363 K. Kinetic studies of ethanol coupling reactions on Cu{sub 0.5}Mg{sub 5}CeO{sub x} and 1.0 wt % K-Cu{sub 0.5}Mg{sub 5}CeO{sub x} catalyst indicates that at similar steady-state acetaldehyde concentrations, the presence of K increases the rates of base-catalyzed aldol coupling reactions to acetone and butyraldehyde. Aldol coupling chain growth reaction rates on 1.2 wt % K-Cu{sub 7.5}Mg{sub 5}CeO{sub x} are higher than on 1.0 wt % K-Cu{sub 0.5}Mg{sub 5}CeO{sub x} even though basic site densities are similar on both samples, suggesting that Cu metal sites are also involved in rate-determining steps required for condensation reactions. Cu appears to enhance the desorption of H{sub 2} via the migration of H species from basic to Cu sites and makes the basic sites available for subsequent C-H bond activation steps. Addition of CO{sub 2} decreases the rate of base-catalyzed chain growth reaction to acetone, but does not affect the rate of ethanol dehydrogenation reaction on Cu metal sites

  6. Separation of flue-gas scrubber sludge into marketable products. Quarterly technical progress report, March 1, 1996--May 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Kawatra, S.K.; Eisele, T.C.

    1996-06-01

    To reduce their sulfur emissions, many coal-fired electric power plants use wet flue-gas scrubbers. These scrubbers convert sulfur oxides into solid sulfate and sulfite sludge, which must then be disposed of. This sludge is a result of reacting limestone with sulfur dioxide to precipitate calcium sulfite and calcium sulfate. It consists of calcium sulfite, gypsum, and unreacted limestone or lime, with miscellaneous objectionable impurities such as iron oxides, silicates, and magnesium, sodium, and potassium oxides or salts. These impurities prevent many sludges from being utilized as a replacement for natural gypsum, and as a result they must be disposed of in landfills, which presents a serious disposal problem.

  7. Advanced byproduct recovery: Direct catalytic reduction of sulfur dioxide to elemental sulfur. Fourth quarterly technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The team of Arthur D. Little, Tufts University and Engelhard Corporation are conducting Phase 1 of a four and a half year, two-phase effort to develop and scale-up an advanced byproduct recovery technology that is a direct, single-stage, catalytic process for converting sulfur dioxide to elemental sulfur. This catalytic process reduces SO{sub 2} over a fluorite-type oxide (such as ceria and zirconia). The catalytic activity can be significantly promoted by active transition metals, such as copper. More than 95% elemental sulfur yield, corresponding to almost complete sulfur dioxide conversion, was obtained over a Cu-Ce-O oxide catalyst as part of an on-going DOE-sponsored, University Coal Research Program. This type of mixed metal oxide catalyst has stable activity, high selectivity for sulfur production, and is resistant to water and carbon dioxide poisoning. Tests with CO and CH{sub 4} reducing gases indicate that the catalyst has the potential for flexibility with regard to the composition of the reducing gas, making it attractive for utility use. The performance of the catalyst is consistently good over a range of SO{sub 2} inlet concentration (0.1 to 10%) indicating its flexibility in treating SO{sub 2} tail gases as well as high concentration streams.

  8. Selective catalytic reduction of sulfur dioxide to elemental sulfur. Quarterly technical progress report No. 6, October 1993--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Liu, W.; Flytzani-Stephanopoulos, M.; Sarofim, A.F.

    1996-01-01

    Elemental sulfur recovery from SO{sub 2}-containing gas stream is highly attractive as it produces a salable product and no waste to dispose of. However, commercially available schemes are complex and involve multi-stage reactors, such as, most notably in the Resox (reduction of SO{sub 2} with coke) and Claus plant (reaction of SO{sub 2} with H{sub 2}S over catalyst). This project will investigate a cerium oxide catalyst for the single stage selective reduction of SO{sub 2} to elemental sulfur by a reductant, such as carbon monoxide. Cerium oxide has been identified in recent work at MIT as a superior catalyst for SO{sub 2} reduction by CO to elemental sulfur because its high activity and high selectivity to sulfur over COS over a wide temperature range(400-650 {degrees}C). The detailed kinetic and parametric studies of SO{sub 2} reduction planned in this work over various CeO{sub 2}-formulations will provide the necessary basis for development of a very simplified process, namely that of a single-stage elemental sulfur recovery scheme from variable concentration gas streams. The potential cost- and energy-efficiency benefits from this approach can not be overstated. A first apparent application is treatment of a regenerator off-gases in power plants using regenerative flue gas desulfurization. Such a simple catalytic converter may offer the long-sought {open_quotes}Claus-alternative{close_quotes} for coal-fired power plant applications.

  9. Selective catalytic reduction of sulfur dioxide to elemental sulfur. Quarterly technical progress report No. 6, October--December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Liu, W.; Flytzani-Stephanopoulos, M.; Sarofim, A.F.

    1993-12-31

    Elemental sulfur recovery from SO{sub 2}-containing gas stream is highly attractive as it produces a salable product and no waste to dispose of. However, commercially available schemes are complex and involve multi-stage reactors, such as, most notably in the Resox (reduction of SO{sub 2} with coke) and Claus plant (reaction of SO{sub 2} with H{sub 2}S over catalyst). This project will investigate a cerium oxide catalyst for the single stage selective reduction of SO{sub 2} to elemental sulfur by a reductant, such as carbon monoxide. Cerium oxide has been identified in recent work at MIT as a superior catalyst for SO{sub 2} reduction by CO to elemental sulfur because its high activity and high selectivity to sulfur over COS over a wide temperature range (400--650{degree}C). The detailed kinetic and parametric studies of SO{sub 2} reduction planned in this work over various CeO{sub 2} formulations will provide the necessary basis for development of a very simplified process, namely that of a single-stage elemental sulfur recovery scheme from variable concentration gas streams. The potential cost- and energy-efficiency benefits from this approach can not be overstated. A first apparent application is treatment of a regenerator off-gases in power plants using regenerative flue gas desulfurization. Such a simple catalytic converter may offer the long-sought ``Claus-alternative`` for coal-fired power plant applications.

  10. E-SMART system for in-situ detection of environmental contaminants. Quarterly technical progress report, July--September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    General Atomics (GA) leads a team of industrial, academic, and government organizations in the development of the Environmental Systems Management, Analysis and Reporting neTwork (E-SMART) for the Defense Advanced Research Project Agency (DARPA), by way of this Technology Reinvestment Project (TRP). E-SMART defines a standard by which networks of smart sensing, sampling, and control devices can interoperate. E-SMART{reg_sign} is intended to be an open standard, available to any equipment manufacturer. The user will be provided a standard platform on which a site-specific monitoring plan can be implemented using sensors and actuators from various manufacturers and upgraded as new monitoring devices become commercially available. This project will further develop and advance the E-SMART standardized network protocol to include new sensors, sampling systems, and graphical user interfaces.

  11. Research and development of a Proton-Exchange-Membrane (PEM) fuel cell system for transportation applications. Progress report for Quarter 8 of the Phase II effort, July 1, 1996--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-08

    This eighth quarterly report summarizes activity from July 1, 1996 through September 30, 1996. The report is organized in sections describing background information and work performed under the main work breakdown structure (WBS) categories. The WBS categories included are fuel processor, fuel cell stack, and system integration and controls. Program scheduling and task progress are presented in the appendix.

  12. Support services for the Office of Energy efficiency and renewable energy. Quarterly progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    R.K. Sen & Associates, Inc., under Contract No. DE-AC01-94CE34027, provides technical and economic analysis support services to the Advanced Utility Concepts Division (AUCD) of DOE. Energetics, Inc. is a subcontractor to R.K. Sen & Associates, Inc. The work performed under this contract is mainly for the DOE Hydrogen R&D Program, although a limited amount of activities are also undertaken for the DOE Battery Energy Storage Program.

  13. Final Technical Progress Report: Development of Low-Cost Suspension Heliostat; December 7, 2011 - December 6, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Bender, W.

    2013-01-01

    Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.

  14. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 71, quarter ending June 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    Progress reports are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.

  15. Nuclear-powered artificial heart prototype system development program. Quarterly progress report, April 1, 1976--June 30, 1976

    Energy Technology Data Exchange (ETDEWEB)

    1976-01-01

    Research progress and accomplishments on the active program tasks (35-46) are reported. The tasks include thermal insulation and thermal protection; thermal converter; blood pump and power coupling; thermal and hydraulics; system integration and interfacing; IVBM system performance; IVBM system fabrications; added IVBM blood pump fabrication; IVBM system life testing; and reliability and quality assurance. (TFD)

  16. Contracts for field projects and supporting research on enhanced oil recovery. Progress review quarter ending September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    Progress reports are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; and field demonstrations in high-priority reservoir classes. A list of available publications is also included.

  17. Hazardous materials in aquatic environment of the Mississippi River basin. Quarterly progress report, July 1--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This report is divided into four aspects relating to water pollution problems in the Mississippi River Basin. They are: collaborative cluster research projects, in which investigators employ a synergistic approach to the solution of problems; initiation research projects, in which a single investigator is involved ; technical support activities, which involve anything that is required to support the research; and the research training and education core, which is designed to develop courses with emphasis on environmental studies. This report presents the objectives and accomplishments of the various research projects for July 1, 1996--September 30, 1996.

  18. Quarterly progress report for the Chemical and Energy Research Section of the Chemical Technology Division, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Jubin, R.T.

    1998-06-01

    The Chemical and Energy Research Section conducts basic and applied research and development in chemical engineering, applied chemistry, and bioprocessing, with an emphasis on energy-driven technologies and advanced chemical separations for nuclear and waste applications. The report describes the various tasks performed within six major areas of research: Hot Cell Operations, Process Chemistry and thermodynamics, Separations and Materials Synthesis, Solution Thermodynamics, biotechnology Research, and Molecular Studies. The name of a technical contact is included with each task described, and readers are encouraged to contact these individuals if they need additional information.

  19. Quarterly progress report for the Chemical and Energy Research Section of the Chemical Technology Division, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Jubin, R.T.

    1998-06-01

    The Chemical and Energy Research Section conducts basic and applied research and development in chemical engineering, applied chemistry, and bioprocessing, with an emphasis on energy-driven technologies and advanced chemical separations for nuclear and waste applications. The report describes the various tasks performed within six major areas of research: Hot Cell Operations, Process Chemistry and thermodynamics, Separations and Materials Synthesis, Solution Thermodynamics, biotechnology Research, and Molecular Studies. The name of a technical contact is included with each task described, and readers are encouraged to contact these individuals if they need additional information.

  20. Hydrogeochemical and stream-sediment survey of the National Uranium Resource Evaluation (NURE) program: western United States. Quarterly progress report, July--September 1976

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-01-01

    Sample site selection and planning were initiated for a reconnaissance sampling project covering 14,000 square miles in western Utah. Reconnaissance sampling contracts were placed for the Humboldt River Basin and six basins in the Lovelock and Winnemucca quadrangles in northern Nevada. Planning was completed for two orientation studies in northeastern Washington. A technical paper, ''Dispersion of Uranium and Selected Trace Elements in Playa Basins,'' was presented at the 25th International Geological Congress in Sydney, Australia, August 15-25, 1976. Installation of the high-throughput instrumental neutron-activation analysis system and a new delayed-neutron counter will be completed in December, 1976. An arc source and 22 direct-reading channels were added to the emission spectrometer for sediment analyses. The Phase II computer system was purchased with FY 1976T capital equipment funds. This system will provide on-line data reduction for several analytical systems and will perform all data-base-management tasks. A computer-readable magnetic tape of the data in the Walker River Basin Pilot Study report was sent to Oak Ridge National Laboratory for entry into the NURE national data base. Data reports for five orientation studies were open-filed in this quarter.