WorldWideScience

Sample records for pwr secondary side

  1. Transfer of chemicals in PWR systems: secondary side

    International Nuclear Information System (INIS)

    Jonas, O.

    1978-01-01

    Transfer of chemicals in the secondary side of pressurized water reactor systems with recirculating and once-through steam generators is considered. Chemical data on water, steam and deposit chemistry of twenty-six operating units are given and major physical-chemical processes and differences between the two systems and between fossil and PWR systems are discussed. It is concluded that the limited available data show the average water and steam chemistry to be within recommended limits, but large variations of impurity concentrations and corrosion problems encountered indicate that our knowledge of the system chemistry and chemical thermodynamics, system design, sampling, analysis and operation need improvement. (author)

  2. VGB primary and secondary side water chemistry guidelines for PWR plants

    International Nuclear Information System (INIS)

    Neder, H.; Wolter, D.; Staudt, U.

    2007-01-01

    The recent revision of the VGB Water Chemistry Guidelines was issued in 2005 and published in the second half of 2006. These guidelines are based on the primary and secondary side operating chemistry experience with all Siemens designed pressurized water reactors gained since the beginning of the 1980s. These guidelines cover For the primary side chemistry Modified lithium boron chemistry, Zinc chemistry for dose rate reduction, Enriched boric acid (EBA) chemistry for high duty core design For the secondary side chemistry High all-volatile treatment (AVT) chemistry (high pH operation) Oxygen injection in the secondary side Especially for the secondary side chemistry, compared with the water chemistry guidelines of other organizations worldwide, these Guidelines are less stringent, providing more operational flexibility to the plant operation, and can be applied for all new designs of steam generators with egg-crates or broached hole tube supports and with I 690TT or I 800 tubing materials. This paper gives an overview of the 2006 revision of the VGB Water Chemistry Guidelines for PWR plants and describes the fundamental goals of water chemistry operation strategies. In addition, the reasons for the selected control parameters and action levels, to achieve an adequate plant performance, are presented based on the operating experience. (orig.)

  3. Study of chemical cleaning technique for removing sludge in secondary side of PWR SG

    International Nuclear Information System (INIS)

    Zhang Mengqin; Zhang Shufeng; Pan Qingchun; Yu Jinghua; Hou Shufeng

    1993-12-01

    The effect of components, concentration, pH, temperature, cleaning time and flowrate of chemical cleaning solvent made from EDTA mainly on Fe 3 O 4 solubility and corrosion rate of A3 carbon steel, S271 low alloy steel and 800 alloy are introduced. A small chemical cleaning test loop (30L) was built to study the cleaning technique. The effect of residue of chemical cleaning solvent on anti-corrosion performance of materials has been studied under the simulation condition of PWR (pressure water reactor) SG (steam generator) secondary side. The results show that the chemical solvent (pH = 7, 10% EDTA, 1% assistance solvent and 0.25% inhibitor A) can dissolve Fe 3 O 4 18 ∼23 g/L under the conditions of 93 +- 5 degree C, 8 hours and 112 r/min (1.8 ∼ 2.0 t/h). The corrosion rate of material is low. When the residue of EDTA is less than 0.01% there is no impact on the anti-corrosion performance of materials in PWR SG secondary side at normal operation condition (260 +- 5 degree C)

  4. Medium scale test study of chemical cleaning technique for secondary side of SG in PWR

    International Nuclear Information System (INIS)

    Zhang Mengqin; Zhang Shufeng; Yu Jinghua; Hou Shufeng

    1997-08-01

    The medium scale test study of chemical cleaning technique for removing corrosion product (Fe 3 O 4 ) in secondary side of SG in PWR has been completed. The test has been carried out in a medium scale test loop. The medium scale test evaluated the effect of the chemical cleaning technique (temperature, flow rate, cleaning time, cleaning process), the state of corrosion product deposition on magnetite (Fe 3 O 4 ) solubility and safety of materials of SG in cleaning process. The inhibitor component of chemical cleaning agent has been improved by electrochemical linear polarization method, the effect of inhibitor on corrosion resistance of materials have been examined in the medium scale test loop, the most components of chemical cleaning agent have been obtained, the EDTA is main component in cleaning agent. The electrochemical method for monitor corrosion of materials during cleaning process has been completed in the laboratory. The study of the medium scale test of chemical cleaning technique have had the optimum chemical cleaning technique for remove corrosion product in SG secondary side of PWR. (9 refs., 4 figs., 11 tabs.)

  5. Experiment and analyses on intentional secondary-side depressurization during PWR small break LOCA. Effects of depressurization rate and break area on core liquid level behavior

    International Nuclear Information System (INIS)

    Asaka, Hideaki; Ohtsu, Iwao; Anoda, Yoshinari; Kukita, Yutaka

    1997-01-01

    The effects of the secondary-side depressurization rate and break area on the core liquid level behavior during a PWR small-break LOCA were studied using experimental data from the Large Scale Test Facility (LSTF) and by using analysis results obtained with a JAERI modified version of RELAP5/MOD3 code. The LSTF is a 1/ 48 volumetrically scaled full-height integral model of a Westinghouse-type PWR. The code reproduced the thermal-hydraulic responses, observed in the experiment, for important parameters such as the primary and secondary side pressures and core liquid level behavior. The sensitivity of the core minimum liquid level to the depressurization rate and break area was studied by using the code assessed above. It was found that the core liquid level took a local minimum value for a given break area as a function of secondary side depressurization rate. Further efforts are, however, needed to quantitatively define the maximum core temperature as a function of break area and depressurization rate. (author)

  6. Steam Generator Owners Group PWR secondary water chemistry guidelines

    International Nuclear Information System (INIS)

    Welty, C.S. Jr.; Green, S.J.

    1985-01-01

    In 1981 the Steam Generator Owners Group (SGOG), a group of domestic and foreign pressurized water reactor (PWR) owners, developed and issued the PWR secondary water chemistry guidelines. The guidelines were prepared in response to the growing recognition that a majority of the problems causing reduced steam generator reliability (e.g., denting, wasteage, pitting, etc.) were related to secondary (steam) side water purity. The guidelines were subsequently issued as an Electric Power Research Institute (EPRI) report. In 1984 they were revised to reflect industry experience in adopting the original issuance and to incorporate new information on causes of corrosion damage. The guidelines have been endorsed and their adoption recommended by the SGOG

  7. PWR secondary water chemistry guidelines: Revision 3

    International Nuclear Information System (INIS)

    Lurie, S.; Bucci, G.; Johnson, L.; King, M.; Lamanna, L.; Morgan, E.; Bates, J.; Burns, R.; Eaker, R.; Ward, G.; Linnenbom, V.; Millet, P.; Paine, J.P.; Wood, C.J.; Gatten, T.; Meatheany, D.; Seager, J.; Thompson, R.; Brobst, G.; Connor, W.; Lewis, G.; Shirmer, R.; Gillen, J.; Kerns, M.; Jones, V.; Lappegaard, S.; Sawochka, S.; Smith, F.; Spires, D.; Pagan, S.; Gardner, J.; Polidoroff, T.; Lambert, S.; Dahl, B.; Hundley, F.; Miller, B.; Andersson, P.; Briden, D.; Fellers, B.; Harvey, S.; Polchow, J.; Rootham, M.; Fredrichs, T.; Flint, W.

    1993-05-01

    An effective, state-of-the art secondary water chemistry control program is essential to maximize the availability and operating life of major PWR components. Furthermore, the costs related to maintaining secondary water chemistry will likely be less than the repair or replacement of steam generators or large turbine rotors, with resulting outages taken into account. The revised PWR secondary water chemistry guidelines in this report represent the latest field and laboratory data on steam generator corrosion phenomena. This document supersedes Interim PWR Secondary Water Chemistry Recommendations for IGA/SCC Control (EPRI report TR-101230) as well as PWR Secondary Water Chemistry Guidelines--Revision 2 (NP-6239)

  8. PWR secondary water chemistry guidelines

    International Nuclear Information System (INIS)

    Bell, M.J.; Blomgren, J.C.; Fackelmann, J.M.

    1982-10-01

    Steam generators in pressurized water reactor (PWR) nuclear power plants have experienced tubing degradation by a variety of corrosion-related mechanisms which depend directly on secondary water chemistry. As a result of this experience, the Steam Generator Owners Group and EPRI have sponsored a major program to provide solutions to PWR steam generator problems. This report, PWR Secondary Water Chemistry Guidelines, in addition to presenting justification for water chemistry control parameters, discusses available analytical methods, data management and surveillance, and the management philosophy required to successfully implement the guidelines

  9. Techniques for Primary-to-Secondary Leak Monitoring in PWR Plants

    International Nuclear Information System (INIS)

    Sohn, Wook; Chi, Jun Hwa; Kang, Duck Won; Tae, Jeong Woo

    2006-01-01

    Historically, corrosion and mechanical damage have made steam generator tubes in PWR plants see various types of degradation from both the primary and secondary sides of the tubes. Since the tube degradation can lead to through-wall failure, the plant personnel should make efforts to prevent the failure. One of such preventive efforts is to monitor primary-to-secondary leakage (PSL) that usually precedes the tube rupture. Thus the objective of PSL monitoring is to make operators to determine when to shutdown the plant in order to minimize the likelihood of propagation of leaks to tube rupture under normal and faulted conditions This paper addresses briefly the status of techniques for PSL monitoring used in PWR plants

  10. Analysis of the alternatives for the chemical treatment of the secondary circuit of PWR power plants

    International Nuclear Information System (INIS)

    Lopes, J.P.G.; Silva Neto, A.J. da; Braganca Junior, A.; Dominguez, D.

    1990-01-01

    The operational experiences within PWR power plants shows that the major problems which affect the plant availability occurs in the secondary side, mainly in the steam generators and condenser. The aim of this report is to perform an evaluation of the main chemical treatment processes, which are applied to the secondary side of PWR power plants in order to reduce the corrosion problems to which are exposed the system equipment, minimizing in this way the shut down and maintenance cost for repairs and replacement of damaged components. (author)

  11. Reliability analyses to detect weak points in secondary-side residual heat removal systems of KWU PWR plants

    International Nuclear Information System (INIS)

    Schilling, R.

    1983-01-01

    Requirements made by Federal German licensing authorities called for the analysis of the secondary-side residual heat removal systems of new PWR plants with regard to availability, possible weak points and the balanced nature of the overall system for different incident sequences. Following a description of the generic concept and the process and safety-related systems for steam generator feed and main steam discharge, the reliability of the latter is analyzed for the small break LOCA and emergency power mode incidents, weak points in the process systems identified, remedial measures of a system-specific and test-strategic nature presented and their contribution to improving system availability quantified. A comparison with the results of the German Risk Study on Nuclear Power Plants (GRS) shows a distinct reduction in core meltdown frequency. (orig.)

  12. A study on the computerization of secondary side on-line chemistry monitoring system of PWR

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Kyung Lin; Lee, Eun Heui [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-12-01

    A computer system for on-line chemistry monitoring system located in secondary side of PWR plant is under developing. Keithley 500 A mainframe and AMM1A and AIM3A modules are used for data acquisition and scientific and engineering software package of ASYST is used for developing software program. The contents are as follows: (1) Data acquisition and real-time display. The output signals of monitoring chemical sensors are stored in PC showing real-time data display as true values and graphics. (2) Data management and trending graphs. The data stored in PC are outcoming in various graphic mode for data management such as simple trending graphs screen display, time duration plot and histogram plot. (3) Daily basis data manual input. The chemical analysis data of grab sample are stored in PC by manual input for supplement data. (4) Tabular data report preparation. Summarized daily, weekly, monthly, quarterly and yearly reports are prepared with various mode of graphic display. 6 figs, 9 tabs, 8 refs. (Author).

  13. A study on the computerization of secondary side on-line chemistry monitoring system of PWR

    International Nuclear Information System (INIS)

    Yang, Kyung Lin; Lee, Eun Heui

    1994-12-01

    A computer system for on-line chemistry monitoring system located in secondary side of PWR plant is under developing. Keithley 500 A mainframe and AMM1A and AIM3A modules are used for data acquisition and scientific and engineering software package of ASYST is used for developing software program. The contents are as follows: 1) Data acquisition and real-time display. The output signals of monitoring chemical sensors are stored in PC showing real-time data display as true values and graphics. 2) Data management and trending graphs. The data stored in PC are outcoming in various graphic mode for data management such as simple trending graphs screen display, time duration plot and histogram plot. 3) Daily basis data manual input. The chemical analysis data of grab sample are stored in PC by manual input for supplement data. 4) Tabular data report preparation. Summarized daily, weekly, monthly, quarterly and yearly reports are prepared with various mode of graphic display. 6 figs, 9 tabs, 8 refs. (Author)

  14. Applicability of oxygenated water chemistry for PWR secondary systems

    Energy Technology Data Exchange (ETDEWEB)

    Hermansson, H.P. [Studsvik Nuclear AB, Nykoeping (Sweden); Takiguchi, H.; Otoha, K. [Japan Atomic Power Co., Tokyo (Japan)

    2002-07-01

    Introduction of oxygenated water chemistry (OWC) in PWR secondary side is considered as a means to reduce the transportation of corrosion products into the steam generator and thus also minimizing crevice deposits and subsequent materials problems. One main concern, however, is the risk of inter-granular attack (IGA) in crevices. In order to study effects on crevice tube IGA by OWC, a series of experiments were performed in a steam generator (SG) simulating loop. This comprised a SG tube and a tube support plate (TSP) together forming the crevice. The over-all objective of the work accounted here was to demonstrate that it is possible to operate the steam generator secondary side with OWC without causing intolerable IGA or other types of attack on the tube in the crevice area. Tubes of sensitized Alloy 600 were exposed during a total of nine experiments in an autoclave using a TSP/tube arrangement with an asymmetric crevice design. Experiments were performed at high and low pH and potential under open and packed crevice conditions. The aggressiveness of the crevice environment was also further increased by addition of carbonate and chloride. Furthermore the tube was pressurized. Experimental parameters were monitored on the primary side as well as in the secondary bulk phase and in the crevice. (authors)

  15. Issues and remedies for secondary system of PWR/VVER

    International Nuclear Information System (INIS)

    Nordmann, Francis; Odar, Suat; Rochester, Dewey

    2012-09-01

    Secondary side degradation of steam generators (SG) and Flow Accelerated Corrosion (FAC) in the secondary system have been for a long time important issues in PWR and VVER types of Nuclear Power Plants. With the evolution of the design, the most important issues are progressively moving from secondary side corrosion of Alloy 600 SG tubing, which is being replaced, to a larger variety of risks associated with potential inadequate chemistries. As far as FAC of carbon steel is concerned, the evolution of treatment selection for minimizing corrosion products transport toward the SG, as well as progressive replacement of components in the feedwater train, decreases the risk of dramatic failures which have occurred in the past. After having briefly explained the reason for the past problems encountered in the secondary system of PWR and VVER, this paper evaluates the risk associated with various impurities or contaminants that may be present in the secondary system and how to mitigate them in the most appropriate, efficient, economical and environmental friendly way. The covered species are sodium, calcium, magnesium, chloride, sulfate and sulfur compounds, fluorides, organic compounds, silica, oxygen, lead, ion exchange resins. This paper also proposes the best remedies for mitigating the new issues that may be encountered in operating plants or units under construction. These are mainly: - Selecting a steam water treatment able to minimize the quantity of corrosion products transported toward the SG; - Mitigating the risk of Flow Induced Vibration by a proper control of deposits in sensitive areas; - Minimizing the risk of concentration of impurities in local areas where they may induce corrosion; - Avoiding the presence of abnormal quantities of some species in SG, such as the detrimental presence of lead and ion exchange resin debris or the controversial presence of organic compounds; - Optimizing costs of maintenance activities (SG mechanical, chemical cleaning

  16. Secondary systems of PWR and BWR

    International Nuclear Information System (INIS)

    Schindler, N.

    1981-01-01

    The secondary systems of a nuclear power plant comprises the steam, condensate and feedwater cycle, the steam plant auxiliary or ancillary systems and the cooling water systems. The presentation gives a general review about the main systems which show a high similarity of PWR and BWR plants. (orig./RW)

  17. PWR Secondary Water Chemistry Control Status: A Summary of Industry Initiatives, Experience and Trends Relative to the EPRI PWR Secondary Water Chemistry Guidelines

    International Nuclear Information System (INIS)

    Fruzzetti, Keith; Choi, Samuel

    2012-09-01

    The latest revision of the EPRI Pressurized Water Reactor (PWR) Secondary Water Chemistry Guidelines was issued in February 2009. The Guidelines continue to focus on minimizing stress corrosion cracking (SCC) of steam generator tubes, as well as minimizing degradation of other major components / subsystems of the secondary system. The Guidelines provide a technically-based framework for a plant-specific and effective PWR secondary water chemistry program. With the issuance of Revision 7 of the Guidelines in 2009, many plants have implemented changes that allow greater flexibility on startup. For example, the previous Guidelines (Revision 6) contained a possible low power hold at 5% power and a possible mid power hold at approximately 30% power based on chemistry constraints. Revision 7 has established a range over which a plant-specific value can be chosen for the possible low power hold (between 5% and 15%) and mid power hold (between 30% and 50%). This has provided plants the ability to establish significant plant evolutions prior to reaching the possible power hold; such as establishing seal steam to the condenser, placing feed pumps in service, or initiating forward flow of heater drains. The application of this flexibility in the industry will be explored. This paper also highlights the major initiatives and industry trends with respect to PWR secondary chemistry; and outlines the recent work to effectively address them. These will be presented in light of recent operating experience, as derived from EPRI's PWR Chemistry Monitoring and Assessment (CMA) program (which contains more than 400 cycles of operating chemistry data). (authors)

  18. Transport of lead in secondary systems of PWR plants: laboratory and plant investigations

    International Nuclear Information System (INIS)

    Feron, D.; Rocher, A.; Nordmann, F.

    1992-01-01

    Both in France and abroad, abnormally high lead concentrations have been found in the deposits on certain steam generator tubes subject to combined inter and transgranular corrosion on the secondary side. Many potential sources of lead have been identified in PWR steam-water system, mainly at the turbine level. Tests on a loop (ORION) have shown that lead (as Pb or PbO) can transport from the condenser to the steam generator and that the contaminant mainly concentrates in flow restricted areas of steam generators

  19. Numerical Study of Thermal Hydraulics for Secondary side of Steam Generator by CUPID/MARS Coupled Simulation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Ryong; Yoon, Han Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    As a thermal-hydraulic behavior in the secondary side of steam generator such as two-phase boiling flow, flow-induce vibration of U-tubes is quite complicated, the importance to numerically investigate the flow behavior has been arisen. Recently, multi-scale analyses have been developed to take into account the primary side as well. In this study, the coupled CUPID and MARS code was used for the simulation of boiler side of the PWR steam generator. Calculation results are compared with the existing code quantitatively. Coupled CUPID/MARS code was applied for the simulation of the steam generator. The primary side of the steam generator and other RCS was simulated by MARS and the secondary side was calculated by CUPID with porous media approach.

  20. Issues and remedies for secondary system of PWR/VVER

    International Nuclear Information System (INIS)

    Nordmann, F.; Odar, S.; Rochester, D.

    2012-01-01

    Secondary side degradation of steam generators (SG) tubing with Alloy 600 MA and flow accelerated corrosion (FAC) of carbon steel have been for a long time important issues for the secondary system of PWR and VVER. With the beneficial evolution of the design (for instance the replacement of Alloy 600 SG tubing), the most important issues are progressively moving to a larger variety of risks associated to potential inadequate chemistries. The best remedies for mitigating the new concerns are: -) selecting a steam water treatment able to minimize the quantity of corrosion products transported to the steam generator, -) mitigating the risk of flow induced vibration by a proper control of deposits in sensitive areas, -) minimizing the risk of concentration of impurities in local areas where they may induce corrosion. The paper also explains: -) the benefit of eliminating or by pass of condensate polishers, -) the absence of need for expensive lead investigation, if no specific pollution occurred, -) the absence of need for very low oxygen in the condensate water, and -) the necessary and optimum number of on-line monitors

  1. A vapor generator equipped with an advanced drain device for the secondary side of the tubes plate

    International Nuclear Information System (INIS)

    Valadon, C.

    1995-01-01

    A draining design is proposed for the tube plate secondary side in a PWR type reactor, that does not interfere with the water flush 'street' thus allowing for an easy inspection and maintenance in the lower part of the tube bundle. The draining system is composed of a main groove on the upper side of the tube plate, which is connected to draining means situated outside the vapor generator. 6 fig

  2. Analyses of plant behaviors at the secondary side depressurization during LOCA of PWR

    Energy Technology Data Exchange (ETDEWEB)

    Kawabe, Yasuharu; Tamaki, Tomohiko; Kohriyama, Tamio; Ohtani, Masanori [Institute of Nuclear Safety System Inc., Mihama, Fukui (Japan)

    2001-09-01

    When high pressure injection systems failed during a small break loss-of-coolant-accident (LOCA) for a PWR, main steam relief valves are opened to operate accumulator systems. However, it is pointed out that the core can be exposed since so-called counter current flow limitation (CCFL) occurs in steam generator (SG) tubes. The possibility of the core exposure by CCFL in a PWR plant was evaluated. First, RELAP5/MOD2 code was modified to be able to calculate CCFL. And then the code was applied to evaluate a 4-loop PWR plant. The LOCA with a rupture 3 inches were analyzed with the following two cases: (1) Only the main steam relief valve of the loop with the rupture is opened. (2) all of the relief valves are opened. It is seen that the CCFL phenomenon occurs in the case (1), however, the core cooling was maintained by the accumulator systems that actuated during the core exposure. On the other hand, the core exposure by CCFL is not observed in the case (2). It is shown that core cooling is promoted by operation of main steam relief valves. (author)

  3. Technical specifications for PWR secondary water chemistry

    International Nuclear Information System (INIS)

    Weeks, J.R.; van Rooyen, D.

    1977-08-01

    The bases for establishing Technical Specifications for PWR secondary water chemistry are reviewed. Whereas extremely stringent control of secondary water needs to be maintained to prevent denting in some units, sound bases for establishing limits that will prevent stress corrosion, wastage, and denting do not exist at the present time. This area is being examined very thoroughly by industry-sponsored research programs. Based on the evidence available to date, short term control limits are suggested; establishment of these or other limits as Technical Specifications is not recommended until the results of the research programs have been obtained and evaluated

  4. On-line analysis of ETA and organic acids in secondary systems of PWR plants

    International Nuclear Information System (INIS)

    Kurashina, Masahiko; Uzawa, Hideo; Utagawa, Koya; Takaku, Hiroshi

    2005-01-01

    To reduce the iron concentration in the secondary water of plants with pressurized water reactors (PWRs), ethanolamine (ETA) is used as an alkalizing agent in the secondary cycle. An on-line ion chromatography (IC) monitoring system for monitoring concentrations of ETA and anions of organic acids was developed, its performance was evaluated, and verification tests were conducted at an actual PWR plant. It was demonstrated that the concentration of both ETA and anions of organic acids may be successfully monitored by IC in PWR secondary cycle streams alkalized by ETA. (orig.)

  5. SODEXPERT: help to PWR plant management to prevent secondary circuit corrosion

    International Nuclear Information System (INIS)

    Eon-Duval, P.; Fiquet, J.M.; Langlet, J.P.

    1996-01-01

    Since about 10 years, problems of secondary circuit corrosion have raised for PWR plant management. The watch staff can't be asked the physicochemical knowledge requested for a proper interpretation of the various probes outputs. So an expert-system has been performed to help the identification of dangerous situation from a corrosion point of view, and immediately start the PWR managing action. This software has been successfully tested and validated. (D.L.). 5 figs., 4 photos

  6. Effect of TOC [total organic carbon] on a PWR secondary cooling water system

    International Nuclear Information System (INIS)

    Gau, J.Y.; Oung, J.C.; Wang, T.Y.

    1989-01-01

    Increasing the amount of total organic carbon (TOC) during the wet layup of the steam generator was a problem in PWR nuclear power plant in Taiwan. The results of surveys of TOC in PWR secondary cooling water systems had shown that the impurity of hydrazine and the bacteria were the main reasons that increase TOC. These do not have a corrosion effect on Inconel 600 and carbon steel when the secondary cooling water containing the TOC is below 200 ppb. But the anaerobic bacteria from the steam generator in wet layup will increase corrosion rate of carbon steel and crevice corrosion of Inconel 600. (author)

  7. Probabilistic reliability analyses to detect weak points in secondary-side residual heat removal systems of KWU PWR plants

    International Nuclear Information System (INIS)

    Schilling, R.

    1984-01-01

    Requirements made by Federal German licensing authorities called for the analysis of the second-side residual heat removal systems of new PWR plants with regard to availability, possible weak points and the balanced nature of the overall system for different incident sequences. Following a description of the generic concept and the process and safety-related systems for steam generator feed and main steam discharge, the reliability of the latter is analyzed for the small break LOCA and emergency power mode incidents, weak points in the process systems are identified, remedial measures of a system-specific and test-strategic nature are presented and their contribution to improving system availability is quantified. A comparison with the results of the German Risk Study on Nuclear Power Plants (GRS) shows a distinct reduction in core meltdown frequency. (orig.)

  8. Thermal-hydraulic study of integrated steam generator in PWR

    International Nuclear Information System (INIS)

    Osakabe, Masahiro

    1989-01-01

    One of the safety aspects of innovative reactor concepts is the integration of steam generators (SGs) into the reactor vessel in the case of the pressurized water reactor (PWR). All of the reactor system components including the pressurizer are within the reactor vessel in the SG integrated PWR. The simple heat transfer code was developed for the parametric study of the integrated SG. The code was compared to the once-through 19-tube SG experiment and the good agreement between the experimental results and the code predictions was obtained. The assessed code was used for the parametric study of the integrated once-through 16 m-straight-tube SG installed in the annular downcomer. The proposed integrated SG as a first attempt has approximately the same tube size and pitch as the present PWR and the SG primary and secondary sides in the present PWR is inverted in the integrated PWR. Based on the study, the reactor vessel size of the SG integrated PWR was calculated. (author)

  9. Aspects of PWR nuclear power plant secondary cycle relating to reactor safety

    International Nuclear Information System (INIS)

    Mueller, A.E.F.; Leal, M.R.L.V.; Dominguez, D.

    1981-01-01

    A safety study of the main steam system, condensate and feedwater systems and water treatment system that belong to the secondary cooling circuits of a PWR nuclear power plant is presented. (E.G.) [pt

  10. Improvement of PWR reliability by corrosion prevention

    International Nuclear Information System (INIS)

    Takamatsu, Hiroshi

    1999-01-01

    Since first PWR in Japan started commercial operation in 1970, we have encountered the various modes of corrosion on primary and secondary side components. We have paid much efforts for resolving these corrosion problems, that is, investigating the causes of corrosion and establishing the countermeasures for these corrosion. We summarize these efforts in this article. (author)

  11. The secondary water chemistry and its quality specification of PWR steam generators

    International Nuclear Information System (INIS)

    Zhang Guiqin.

    1984-01-01

    Reasonably organizing the secondary water chemistry of a steam generator is of great importance for improving thermal-hydraulic characteristics and avoiding or alleviating probability of its internals failures by corrosion. In this paper emphasis is put on importance and task of the secondary water chemistry, the meaning and the control demand for feedwater and boiler water specification. At the same time, the current situation on the secondary water chemistry of PWR steam generators is reviewed generally. (Author)

  12. Secondary water chemistry control practices and results of the Japanese PWR plants

    International Nuclear Information System (INIS)

    Maeda, Akihiro; Shoda, Yasuhiko; Ishihara, Nobuo; Murata, Kazutoyo; Fujiwara, Hiroyuki; Hayakawa, Hitoshi; Matsuda, Tadashi

    2012-09-01

    In Japan, since the start of the operation of the first PWR plant, Mihama Unit-1 in 1970, 24 PWR plants have been built by 2010, and all of them are in operation. Due to the plant-specific needs of management, and by flexibly incorporating the state-of-the-art insights into the design, the system configurations of the plants vary so many as 15 types. Meanwhile, the geographical feature of Japan makes all the Japanese PWR plants to have condensers cooled by sea water, and all the plants have a common system with a full-flow Condensate Polisher System (CPS). To prevent corrosion, continued improvements of the secondary water chemistry management has been performed like other countries, and one of the major features of the Japanese PWR plants is an enhanced provision for the condenser leakage. The water quality of SG (Steam Generator) has been significantly improved by the provision for the sea water leakage, in combination with other improvements in water chemistry management. Also in Japan, almost all of the treatments of the spent polisher resin and the wastewater are performed within the power plant sites. To facilitate the treatment of the waste water and the regeneration of the spent resins, either ammonia or ETA (Ethanol Amine) is selected as the pH adjustment agent for the secondary system water. Also at the ammonia treatment, high pH accomplishes the inhibition of the piping wall thinning and the lower iron transportation into SGs. In addition, the iron transported into the SG is removed by the chemical conditioning treatment called ASCA (Advanced Scale Conditioning Agent). This provides the effective recovery of the SG heat-transfer performance, and the improved SG support plate BEC (Broached Egg Crate) hole blockage rates. Basically in Japan, the secondary water chemistry management has been improved based on a single basic specification, for the variety of the plant configurations, with the plant-specific investigations and analyses. This paper summarizes

  13. Materials performance in operating PWR steam generators

    International Nuclear Information System (INIS)

    Weeks, J.R.

    1975-01-01

    The Inconel-600 tubing in operating PWR steam generators has developed leaks due to intergranular stress corrosion cracking or a general wastage attack, originating from the secondary side of the tubing. Corrosion has been limited to those areas of the steam generators where limited coolant circulation and high heat flux have caused impurities to concentrate. Wastage or pitting attack has always been associated with local concentration of sodium hydrogen phosphates, whereas stress corrosion has been associated with local concentration of sodium or potassium hydroxides. The only instance of stress corrosion originating from the primary side occurred on cold-worked tubing when hydrogen was not added to getter oxygen, and LiOH was not added to raise the pH of the primary coolant. All PWR manufacturers are now recommending that the phosphate treatment of the secondary coolant be abandoned in favor of an all-volatile treatment. Experience in operating plants has shown, however, that removal of phosphate-rich sludge deposits is difficult, and that further wastage and/or intergranular stress corrosion may develop; the residual sodium phosphates gradually convert by reaction with corrosion product hydroxides to sodium hydroxide, which remains concentrated in the limited flow areas. Improvements in circulation patterns have been achieved by inserting flow baffles in some PWR steam generators. Inservice monitoring by eddy current techniques is useful for detecting corrosion-induced defects in the tubing, but irreproducibility in field examinations can lead to uncertainties interpreting the results. (U.S.)

  14. Anti -corrosion Effect of ETA on Materials in Secondary Loop of PWR

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    In the world, over sixty percent of nuclear power plant have used advanced amunes ETA(Ethanolamine) as pH control agent in secondary loop of PWR. There are eighty percent of nuclear powerplants using ETA in USA. The corrosion of materials in steam generator (SG) tube and secondary looppower water reactor have been inhibited, the life of SG and the economics of the plant are increasedbecause of using ETA.

  15. Operation results of the secondary circuits of the French PWR type power plant park

    International Nuclear Information System (INIS)

    Mercier, J.P.

    1984-01-01

    Global results of performances realized since 1981 by the French PWR 900 MW power plants (installed power, availability, casual or planned shutdowns); analysis of the behaviour (casual unavailability) comparing together the performances of the different components in the secondary circuit; behaviour of the principal materials of the secondary circuit and their weight in the unavailabilities of the whole French nuclear park [fr

  16. Thermal stability of morpholine, AMP and sarcosine in PWR secondary systems. Laboratory and loop experiments

    International Nuclear Information System (INIS)

    Feron, D.; Lambert, I.

    1991-01-01

    Laboratory and loop tests have been carried out in order to investigate the thermal stability of three amines (morpholine, AMP and sarcosine) in PWR secondary conditions. Laboratory experiments have been performed in a titanium autoclave at 300 deg C. The results pointed out high thermal decomposition rates of AMP and sarcosine. A decomposition mechanism is proposed for the 3 amines. Loop tests have been performed in order to compare steam cycle conditioning with ammonia, morpholine and AMP. The amine concentrations and the decomposition products such as acetate and formate have been followed around the secondary circuit of the ORION loop which reproduces the main physico-chemical characteristics of a PWR secondary circuit. These concentrations are reported together with the evolution of cationic conductivities. The influence of oxygen concentration on amine thermal stability has been observed. Results are expressed also in terms of decomposition rates and of relative volatility

  17. PWR secondary water chemistry study

    International Nuclear Information System (INIS)

    Pearl, W.L.; Sawochka, S.G.

    1977-02-01

    Several types of corrosion damage are currently chronic problems in PWR recirculating steam generators. One probable cause of damage is a local high concentration of an aggressive chemical even though only trace levels are present in feedwater. A wide variety of trace chemicals can find their way into feedwater, depending on the sources of condenser cooling water and the specific feedwater treatment. In February 1975, Nuclear Water and Waste Technology Corporation (NWT), was contracted to characterize secondary system water chemistry at five operating PWRs. Plants were selected to allow effects of cooling water chemistry and operating history on steam generator corrosion to be evaluated. Calvert Cliffs 1, Prairie Island 1 and 2, Surry 2, and Turkey Point 4 were monitored during the program. Results to date in the following areas are summarized: (1) plant chemistry variations during normal operation, transients, and shutdowns; (2) effects of condenser leakage on steam generator chemistry; (3) corrosion product transport during all phases of operation; (4) analytical prediction of chemistry in local areas from bulk water chemistry measurements; and (5) correlation of corrosion damage to chemistry variation

  18. PWR plant transient analyses using TRAC-PF1

    International Nuclear Information System (INIS)

    Ireland, J.R.; Boyack, B.E.

    1984-01-01

    This paper describes some of the pressurized water reactor (PWR) transient analyses performed at Los Alamos for the US Nuclear Regulatory Commission using the Transient Reactor Analysis Code (TRAC-PF1). Many of the transient analyses performed directly address current PWR safety issues. Included in this paper are examples of two safety issues addressed by TRAC-PF1. These examples are pressurized thermal shock (PTS) and feed-and-bleed cooling for Oconee-1. The calculations performed were plant specific in that details of both the primary and secondary sides were modeled in addition to models of the plant integrated control systems. The results of these analyses show that for these two transients, the reactor cores remained covered and cooled at all times posing no real threat to the reactor system nor to the public

  19. Possibility of Localized Corrosion of PWR primary side materials in oxidative decontamination condition

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sang Yoon; Jung, Jun Young; Won, Huijun; Kim, Seon Byeong; Choi, Wangkyu; Moon, Jeikwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2014-05-15

    Primary circuit of a PWR (radionuclides uptake in the inner oxide layer and oxide/metal interface occurred inevitably. Therefore, it is necessary to remove the inner oxide layer as well as the outer oxide layer to achieve excellent decontamination effects. It is known that the outer oxide layers are typically composed of Fe{sub 3}O{sub 4} and NiFe{sub 2}O{sub 4}. On the other hand, the inner oxide layers are composed of Cr{sub 2}O{sub 3}, (Ni{sub 1-x}Ni{sub x})(Cr{sub 1-y}Fe{sub y}){sub 2}O{sub 4}, and FeCr{sub 2}O{sub 4}. Because of chromium in the trivalent oxidation state which is difficult to dissolve, the oxide layer has an excellent protectiveness and is hard to decontaminate. For the dissolution of chromium-rich oxide, there have been developed an alkaline permanganate (AP) or nitric permanganate (NP). A disadvantage of the AP process is the generation of a large volume of secondary waste. On the other hand, NP process is highly incompatible to the corrosion of the structure materials. In this study as a part of developing decontamination process, we investigated the corrosion behavior of the structure materials such as Inconel-600 and type 304 stainless steel in NP and AP oxidative decontamination conditions for the safe use of an oxidative phase in PWR system decontamination. The corrosion behavior was analyzed through the potential-pH equilibrium for the system of Cr-H{sub 2}O / Mn-H{sub 2}O at 90 .deg. C and potentiodynamic polarization in a typical AP and NP solution were evaluated. The AP or NP treated specimen surface was observed using an optical microscope and scanning electron microscopy (SEM) for an evaluation of the localized corrosion. The possibility of localized corrosion of PWR primary side materials under oxidative decontamination condition was evaluated using a potentiodynamic polarization technique, observation of localized corrosion morphology, and consideration of potential-pH diagrams at 90 .deg. C. From the results of these tests, we

  20. Theoretical-experimental modelling of the momentum equation for PWR reactor steam generators

    International Nuclear Information System (INIS)

    Rodrigues, L.A.H.

    1994-01-01

    A mathematical model in steady-state conditions of the momentum equation at the secondary side of a vertical U-tube steam generator with recirculation is presented. The U-tube test section was the 150 bar - Circuito Termoidraulico Experimental - CTE-150. This facility is a Experimental Thermal-hydraulic Circuit and operates at the same conditions (pressure and temperature) of a typical PWR reactor. A comparison between the Homogeneous and Separate Flow models was done. those models were verified and compared with experimental data for several operational conditions. The results show that the model fits very well the experimental data and seems to be appropriate to study water recirculation of a steam generator secondary side. (author)

  1. Magnetite deposition in PWR secondary systems

    International Nuclear Information System (INIS)

    Schneider, V.; Riess, R.; Ruehle, W.

    2000-01-01

    Recently, local magnetite (Fe 3 04) deposition has been observed at various locations within the secondary systems of Siemens-designed PWRs. These deposits sometimes limited operational flexibility and affected routine operation checks. In addition, these deposits may affect the heat transfer characteristics of heat exchangers. Prior to replacement of components or piping or other extensive maintenance activities it should be investigated whether any modification in secondary-side water chemistry might counteract this corrosion phenomenon, which has proven very effective in maintaining steam generator performance. A VGB study will make an assessment of available field information, and countermeasures will be elaborated. This paper describes the current status of the project. (orig.) [de

  2. Study on the computerization of PWR secondary side chemistry monitoring

    International Nuclear Information System (INIS)

    Yang, Kyung Rin; Koo, Je Hyoo; Lee, Eun Hee; Hong, Kwang Bum; Kang, Hee Suck

    1991-01-01

    Samples of the secondary system in the Yong Gwang 1 Plant were sampled and analysed once a month at 13 sampling points. The main components of materials in the secondary system and corrosion products consisted of iron. Therefore, iron component was used with the index of corrosion products. The weight of iron which was accumulated in the bottom of stea generator can be calculated from the iron concentration and flow rates. That is, the weight of iron which was flowed into the steam generator belonging to the feedwater and the weight of iron which was discharged out from the steam generator was calculated. From these data, the weight of iron which was accumulated in the steam generator was calculated. According to the calculation, it was found that the amount of accumulated iron was 2.01 kg / year for the steam generator A, 1.73 kg / year for the steam generator B and 1.84 kg / year for the steam generator C. (Author)

  3. Implementation of PWR steady state self-initialization feature into RELAP4/MOD6/U4/J3

    International Nuclear Information System (INIS)

    Yoshida, Kazuo

    1987-07-01

    A PWR steady state self-initialization feature has been implemented into the RELAP4/MOD6/U4/J3 code which is an improved version of RELAP4/MOD6 and can analyze not only large break but also small break LOCA in LWRs. This feature is originated from RELAP4/MOD7 which is the most updated released version of RELAP4 from INEL. Several FORTRAN subroutines in MOD7 related to this feature were transplanted into MOD6/U4/J3 with some improvements, which were the modification of method to take a balance of heat transfer between primary and secondary side at SG-U tubes, and to make it possible to nodalize secondary side of SG as multi-node. Advantages realized by implementation of this option are saving of time in initializaing a new model and an assurance of steady state and self consistency of input data in a small break LOCA analysis of a PWR. (author)

  4. Field experience of cleanliness inspection for secondary-side in PWR steam generators

    International Nuclear Information System (INIS)

    Ding Xunshen

    1997-05-01

    The mechanical cleaning and TV inspection technology for secondary-side in steam generators of Daya Bay Nuclear Power Plant has been used for preventing the heat transfer tubes from damage caused by residues in steam generator and foreign objects. A lancing has been used for steam generators. The high-pressure jet sent from the central lane to the inside of the bundle has two objectives: (a) the mechanical energy in the jet breaks up the deposit, and (b) the particles are then carried to the periphery of the generator, where they are collected by a water circulation system. The TV inspection consists of the inspection before lancing and after lancing. The former includes the inspection of outer tube lane and central tube lane, and the extraction of foreign objects; the latter includes the inspection of inter tube area, outer tube lane and central tube lane, and the extraction of foreign objects. Video cassette are visualized by a specialist who is qualified to realize a map representative of the cleanliness state of the tubesheet, and to judge if it is or not acceptable. The TV inspection obtained a cleanliness conclusion according to acceptance criteria. So, it is important to work out cleanliness acceptance criteria suit for every operation stages. The site practices shown that after lancing, although hard deposit existed and height of hard deposit in some local place exceeded 5 mm, but the sludge remaining on tubesheet was less. If we can conduct periodic lancing to steam generator, the increase rate of hard deposit will be small. (7 refs., 12 figs.)

  5. Water chemistry in PWR

    International Nuclear Information System (INIS)

    Abe, Kenji

    1987-01-01

    This article outlines major features and basic concept of the secondary system of PWR's and water properties control measures adopted in recent PWR plants. The secondary system of a PWR consists of a condenser cooling pipe (aluminum-brass, titanium, or stainless steel), low-pressure make-up water heating pipe (aluminum-brass or stainless steel), high-ressure make-up water heating pipe (cupro-nickel or stainless steel), steam generator heat-transfer pipe (Inconel 600 or 690), and bleed/drain pipe (carbon steel, low alloy steel or stainless steel). Other major pipes and equipment are made of carbon steel or stainless steel. Major troubles likely to be caused by water in the secondary system include reduction in wall thickness of the heat-transfer pipe, stress corrosion cracking in the heat-transfer pipe, and denting. All of these are caused by local corrosion due to concentration of purities contained in water. For controlling the water properties in the secondary system, it is necessary to prevent impurities from entering the system, to remove impurities and corrosion products from the system, and to prevent corrosion of apparatus making up the system. Measures widely adopted for controlling the formation of IGA include the addition of boric acid for decreasing the concentration of free alkali and high hydrazine operation for providing a highly reducing atmospere. (Nogami, K.)

  6. Preliminary assessment of PWR Steam Generator modelling in RELAP5/MOD3

    International Nuclear Information System (INIS)

    Preece, R.J.; Putney, J.M.

    1993-07-01

    A preliminary assessment of Steam Generator (SG) modelling in the PWR thermal-hydraulic code RELAP5/MOD3 is presented. The study is based on calculations against a series of steady-state commissioning tests carried out on the Wolf Creek PWR over a range of load conditions. Data from the tests are used to assess the modelling of primary to secondary side heat transfer and, in particular, to examine the effect of reverting to the standard form of the Chen heat transfer correlation in place of the modified form applied in RELAP5/MOD2. Comparisons between the two versions of the code are also used to show how the new interphase drag model in RELAP5/MOD3 affects the calculation of SG liquid inventory and the void fraction profile in the riser

  7. Specification of water quality for the FRAMATOME PWR secondary circuit

    International Nuclear Information System (INIS)

    Nordmann, F.

    1980-03-01

    This paper describes the purpose, theory and scope of secondary system chemical specifications for FRAMATOME PWR nuclear power plants. All volatile treatment was chosen: controlling the feedwater pH by means of a volatile amine (ammonia, morpholine), and excluding oxygen by the addition of hydrazine. The pollutants are monitored at the steam generator drains by completely automatic measurements using simple and reliable techniques: pH measurement and a diagram of the cation conductivity versus sodium. An explanation is given of the monitoring techniques and to the effect of the various kinds of possible pollutant. A new concept is described, the annual quota expressed in day.microsiements.cm -1 which enables the amount of absorbed pollutants in the steam generator to be evaluated. The methods used for maintaining the desired chemical quality are dealt with [fr

  8. 5. International seminar on primary and secondary side water chemistry of nuclear power plants

    International Nuclear Information System (INIS)

    2001-01-01

    The major subjects of the meetings are: water chemistry of primary and secondary coolant circuits of PWR type reactors (mainly WWER types), corrosion of steam generators, decontamination processes, treatment of radioactive waste waters and related subjects. All the 29 papers were individually indexed and abstracted for the INIS database. (R.P.)

  9. 5. International seminar on primary and secondary side water chemistry of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The major subjects of the meetings are: water chemistry of primary and secondary coolant circuits of PWR type reactors (mainly WWER types), corrosion of steam generators, decontamination processes, treatment of radioactive waste waters and related subjects. All the 29 papers were individually indexed and abstracted for the INIS database. (R.P.)

  10. Optimization of secondary side water chemistry in TQNPC

    International Nuclear Information System (INIS)

    Fang Lan

    2007-01-01

    This article briefly introduces the types of corrosion that may be happened on steam generator heat exchange tubes in Qinshan CANDU6 nuclear power station and chemical effects on corrosion. The water chemistry optimization on minimzing deposition and corrosion of steam generators are introduced. The article summarizes the experiences of plant chemistry control and morpholine operation, providing guidance for optimizing secondary side water chemistry in the future, giving reference on selection of secondary side alkali agent and setting water chemistry specifications for other nuclear power stations. (authors)

  11. Design and static simulation of secondary loop of small PWR nuclear power plants

    International Nuclear Information System (INIS)

    Martin Lopez, L.A.N.

    1989-01-01

    A computer program that has been developed with the purpose of making easier the decisions concerning the design of the secondary loop of small PWR nuclear power plants through numerical experiments of low running costs and short time is presented. Initially, the first part of the computer program is described. It aims to preliminarily design several major components of the secondary circuit from user-defined design conditions. Next, the second part of the computer program is presented. It simulates the steady state operation at part-load conditions of the preliminary design of the plant by generating and solving systems of simultaneous nonlinear algebraic equations, their number varying from 17 to 107. The computer program has been tested for several application cases. The program results are discussed in the last part of the work, along with several aspects to be added to the program in future works. (author)

  12. Corrosion in PWR steam generator tubes made of alloy 600TT: overview of operating experience, NDE and safety issues

    International Nuclear Information System (INIS)

    Curieres, I. de; Sollier, T.; Delaval, C.

    2015-01-01

    About 60 PWR plants worldwide are operating with steam generator tubes made of alloy 600TT, among which 27 are located in France. This alloy is susceptible to corrosion, both on the primary and secondary side in every fleet, though with different kinetics or extent. It is noteworthy that many of the primary side corrosion issues can be clearly explained by design or operating conditions. However, studies show that all the secondary side issues are much hardly explained by simple considerations. This paper will give an overview of the international operating experience of this alloy and indicate the associated controllability and safety-related issues. An emphasis will be put on the manufacturing, chemistry and specificities of the different fleets. The French situation will be reviewed in this frame. (authors)

  13. The use of advanced scale conditioning agents for maintenance of the secondary side of nuclear plant steam generators

    International Nuclear Information System (INIS)

    Battaglia, P.J.; Rogosky, D.L.

    2006-01-01

    Maintaining the secondary side of steam generators within a pressurized water reactor (PWR) free of deposited corrosion products and corrosion-inducing contaminants is key to ensuring their long-term operation. New cleaning processes have become available to aid nuclear plant personnel in optimizing secondary side maintenance strategies. These strategies include both maintaining nuclear steam generators corrosion free while maintaining full power operation. The conference presentation will discuss ASCA use and the major field experience acquired in the last several years in the United States and in Japan. Hokkaido Electric, Dominion Engineering, Inc. and Westinghouse cosponsored the development of ASCAs for use in the Nuclear Utility industry, and all three are active in field use programs. Westinghouse owns the worldwide rights for ASCA implementation except in Japan where MHI and NEL have been granted licenses to apply ASCAs. Dominion Engineering Inc., owns the ASCA patents and performs the laboratory qualification testing associated with the ASCA programs, and Hokkaido Electric are joint patent holders for ASCAs and have been implementing their use at the Tomari plants for cleaning and thermal hydraulic performance enhancements. The specific experience discussed in the presentation will include: 1. Full Bundle Maintenance ASCAs at Vogtle Units 2 and 2 and Wolf Creek (USA). 2. Top of the Tubesheet ASCAs with high pressure sludge lancing at Wolf Creek and UEC at Vogtle Units 1 and 2 (USA). 3. Thermal Hydraulic Recovery and Maintenance ASCAs at the Hokkaido Electric Tomari Units 1 and 2 (Japan). (author)

  14. 21-PWR Waste Package Side and End Impacts

    International Nuclear Information System (INIS)

    V. Delabrosse

    2003-01-01

    The objective of this calculation is to determine the structural response of a 21-Pressurized Water Reactor (PWR) spent nuclear fuel waste package impacting an unyielding surface. A range of initial velocities and initial angles between the waste package and the unyielding surface is studied. The scope of this calculation is limited to estimating the area of the outer shell (OS) where the residual stress exceeds a given limit (hereafter ''damaged area''). The stress limit is defined as a fraction of the yield strength of the OS material, Alloy 22 (SB-575 N06022), at the appropriate temperature. The design of the 21-PWR waste package used in this calculation is that defined in Reference 8. However, a value of 4 mm was used for the gap between the inner shell and the OS, and the thickness of the OS was reduced by 2 mm. The sketch in Attachment I provides additional information not included in Reference 8. All obtained results are valid for this design only. This calculation is associated with the waste package design and was performed by the Specialty Analyses and Waste Package Design Section. The waste package (i.e. uncanistered spent nuclear fuel disposal container) is classified as Quality Level 1

  15. 21-PWR Waste Package Side and End Impacts

    International Nuclear Information System (INIS)

    T. Schmitt

    2005-01-01

    The objective of this calculation is to determine the structural response of a 21-Pressurized Water Reactor (PWR) spent nuclear fuel waste package impacting an unyielding surface. A range of initial velocities and initial angles between the waste package and the unyielding surface is studied. The scope of this calculation is limited to estimating the area of the outer shell (OS) where the residual stress exceeds a given limit (hereafter ''damaged area''). The stress limit is defined as a fraction of the yield strength of the OS material, Alloy 22 (SB-575 N06022), at the appropriate temperature. The design of the 21-PWR waste package used in this calculation is that defined in Reference 8. However, a value of 4 mm was used for the gap between the inner shell and the OS, and the thickness of the OS was reduced by 2 mm. The sketch in Attachment I provides additional information not included in Reference 8. All obtained results are valid for this design only. This calculation is associated with the waste package design and was performed by the Specialty Analyses and Waste Package Design Section. The waste package (i.e. uncanistered spent nuclear fuel disposal container) is classified as Quality Level 1

  16. Simulation of fission products behavior in severe accidents for advanced passive PWR

    International Nuclear Information System (INIS)

    Tong, L.L.; Huang, G.F.; Cao, X.W.

    2015-01-01

    Highlights: • A fission product analysis model based on thermal hydraulic module is developed. • An assessment method for fission product release and transport is constructed. • Fission products behavior during three modes of containment response is investigated. • Source term results for the three modes of containment response are obtained. - Abstract: Fission product behavior for common Pressurized Water Reactor (PWR) has been studied for many years, and some analytical tools have developed. However, studies specifically on the behavior of fission products related to advanced passive PWR is scarce. In the current study, design characteristics of advanced passive PWR influencing fission product behavior are investigated. An integrated fission products analysis model based on a thermal hydraulic module is developed, and the assessment method for fission products release and transport for advanced passive PWR is constructed. Three modes of containment response are simulated, including intact containment, containment bypass and containment overpressure failure. Fission products release from the core and corium, fission products transport and deposition in the Reactor Coolant System (RCS), fission products transport and deposition in the containment considering fission products retention in the in-containment refueling water storage tank (IRWST) and in the secondary side of steam generators (SGs) are simulated. Source term results of intact containment, containment bypass and containment overpressure failure are obtained, which can be utilized to evaluate the radiological consequences

  17. Resistance of Incoloy 800 steam generator tube to pitting corrosion in PWR secondary water at 250°C

    International Nuclear Information System (INIS)

    Schvartzman, Mônica M.A.M.; Albuquerque, Adriana Silva de; Esteves, Luiza; Rabello, Emerson G.; Mansur, Fábio Abud

    2017-01-01

    The steam generator (SG) is one of the main components of a PWR, so the performance of this type of nuclear power plant depends to a large extent on the trouble-free operation of SGs. Its degradation significantly affects the overall plant performance. Alloy 800NG (Incoloy® 800) is a nickel-iron-chromium alloy used for steam generator tubes in PWRs due to their high strength, good workability and resistance to corrosion. This behavior is attributed to the protective oxide film formed on the metal surface by contact with the high temperature pressurized water. However, chloride is one of major SG impurities that cause the breakdown of the passive film and initiate localized corrosion in passive metals as Alloy 800NG. The aim of this study is to provide information about the pitting corrosion behavior of the Incoloy® 800 steam generator tube under normal secondary circuit parameters (250 deg C and 5 MPa) and abnormal conditions of operation (presence of chloride ions in the secondary water). For this, optical microscopy, XRD and EDS analysis and electrochemical tests have been carried out under simulated PWR secondary water operating conditions. The susceptibility to pitting corrosion was evaluated using electrochemical tests and the oxide layer formed on material was examined by means of scanning electron microscopy (SEM) and energy dispersive X-ray spectrometer (EDS) analyses. (author)

  18. Resistance of Incoloy 800 steam generator tube to pitting corrosion in PWR secondary water at 250°C

    Energy Technology Data Exchange (ETDEWEB)

    Schvartzman, Mônica M.A.M. [Pontifícia Universidade Católica de Minas Gerais (PUC-Minas), Belo Horizonte, MG (Brazil); Albuquerque, Adriana Silva de; Esteves, Luiza; Rabello, Emerson G.; Mansur, Fábio Abud, E-mail: monicacdtn@gmail.com, E-mail: asa@cdtn.br, E-mail: luiza.esteves@cdtn.br, E-mail: egr@cdtn.br, E-mail: fametalurgica@gmail.com [Centro de Desenvolvimento da Tecnologia Nuclear (CDTN/CNEN-MG), Belo Horizonte, MG (Brazil)

    2017-07-01

    The steam generator (SG) is one of the main components of a PWR, so the performance of this type of nuclear power plant depends to a large extent on the trouble-free operation of SGs. Its degradation significantly affects the overall plant performance. Alloy 800NG (Incoloy® 800) is a nickel-iron-chromium alloy used for steam generator tubes in PWRs due to their high strength, good workability and resistance to corrosion. This behavior is attributed to the protective oxide film formed on the metal surface by contact with the high temperature pressurized water. However, chloride is one of major SG impurities that cause the breakdown of the passive film and initiate localized corrosion in passive metals as Alloy 800NG. The aim of this study is to provide information about the pitting corrosion behavior of the Incoloy® 800 steam generator tube under normal secondary circuit parameters (250 deg C and 5 MPa) and abnormal conditions of operation (presence of chloride ions in the secondary water). For this, optical microscopy, XRD and EDS analysis and electrochemical tests have been carried out under simulated PWR secondary water operating conditions. The susceptibility to pitting corrosion was evaluated using electrochemical tests and the oxide layer formed on material was examined by means of scanning electron microscopy (SEM) and energy dispersive X-ray spectrometer (EDS) analyses. (author)

  19. Analytical one-dimensional frequency response and stability model for PWR nuclear power plants

    International Nuclear Information System (INIS)

    Hoeld, A.

    1975-01-01

    A dynamic model for PWR nuclear power plants is presented. The plant is assumed to consist of one-dimensional single-channel core, a counterflow once-through steam generator (represented by two nodes according to the nonboiling and boiling region) and the necessary connection coolant lines. The model describes analytically the frequency response behaviour of important parameters of such a plant with respect to perturbations in reactivity, subcooling or mass flow (both at the entrances to the reactor core and/or the secondary steam generator side), the perturbations in steam load or system pressure (on the secondary side of the steam generator). From corresponding 'open' loop considerations it can then be concluded - by applying the Nyquist criterion - upon the degree of the stability behaviour of the underlying system. Based on this theoretical model, a computer code named ADYPMO has been established. From the knowledge of the frequency response behaviour of such a system, the corresponding transient behaviour with respect to a stepwise or any other perturbation signal can also be calculated by applying an appropriate retransformation method, e.g. by using digital code FRETI. To demonstrate this procedure, a transient experimental curve measured during the pre-operational test period at the PWR nuclear power plant KKS Stade was recalculated using the combination ADYPMO-FRETI. Good agreement between theoretical calculations and experimental results give an insight into the validity and efficiency of the underlying theoretical model and the applied retransformation method. (Auth.)

  20. History of a secondary side inspection tooling development

    International Nuclear Information System (INIS)

    Harris, W.

    2012-01-01

    This presentation provides a brief history (1980 to present day) of steam generator secondary side tooling requirements, tooling development, tooling available today and how and where this tooling has been implemented for steam generator secondary side inspections. History of Tooling Development discussion covers the relatively short time period from when the SGSS tooling was required and why as well the associated challenges with development through present day; Available Tooling discussion covers the actual tooling available today, locations in the steam generator where the tooling is used and how the tooling works; Implementation discussion covers where in the world this tooling has been deployed as well the benefits the tooling has provided. (author)

  1. Design of a steam generator for PWR power plants and steady state simulation

    International Nuclear Information System (INIS)

    Ferreira, W.J.

    1982-01-01

    A procedure and a computer code for the thermal design of a steam generator for PWR power plants is developed. A vertical integral steam generator with inverted U-tubes and natural circulation of the secondary side is selected for modelling. Primary fluid velocity and recirculation ratio are varied to obtain the preliminary dimensions. Further, adjustments are made through iteractive solution of the equations of conservation of mass, energy and momentum. An agreement is found between design calculations for steam generators of different capacities and existing designs. (Author) [pt

  2. NPP Krsko secondary side analysis

    International Nuclear Information System (INIS)

    Fabijan, Lj.

    1987-01-01

    The purpose of this work is to analyze secondary side thermohydraulics response on steam generator tube plugging in order to ensure nominal NPP power. We had established that the additional opening of the governing valve No. 3 and 4 can compensate pressure drop caused by steam generator tube plugging. Two main steam flows with four governing valves were simulated. Steam expansion in turbine and feed water system was modeled separately. All important process point and steam moisture changes impact on nominal NPP power were analysed. (author)

  3. PACTEL and PWR PACTEL Test Facilities for Versatile LWR Applications

    Directory of Open Access Journals (Sweden)

    Virpi Kouhia

    2012-01-01

    Full Text Available This paper describes construction and experimental research activities with two test facilities, PACTEL and PWR PACTEL. The PACTEL facility, comprising of reactor pressure vessel parts, three loops with horizontal steam generators, a pressurizer, and emergency core cooling systems, was designed to model the thermal-hydraulic behaviour of VVER-440-type reactors. The facility has been utilized in miscellaneous applications and experiments, for example, in the OECD International Standard Problem ISP-33. PACTEL has been upgraded and modified on a case-by-case basis. The latest facility configuration, the PWR PACTEL facility, was constructed for research activities associated with the EPR-type reactor. A significant design basis is to utilize certain parts of PACTEL, and at the same time, to focus on a proper construction of two new loops and vertical steam generators with an extensive instrumentation. The PWR PACTEL benchmark exercise was launched in 2010 with a small break loss-of-coolant accident test as the chosen transient. Both facilities, PACTEL and PWR PACTEL, are maintained fully operational side by side.

  4. PACTEL and PWR PACTEL Test Facilities for Versatile LWR Applications

    International Nuclear Information System (INIS)

    Virpi Kouhia, V.; Purhonen, H.; Riikonen, V.; Puustinen, M.; Kyrki-Rajamaki, R.; Vihavainen, J.

    2012-01-01

    This paper describes construction and experimental research activities with two test facilities, PACTEL and PWR PACTEL. The PACTEL facility, comprising of reactor pressure vessel parts, three loops with horizontal steam generators, a pressurizer, and emergency core cooling systems, was designed to model the thermal-hydraulic behaviour of VVER-440-type reactors. The facility has been utilized in miscellaneous applications and experiments, for example, in the OECD International Standard Problem ISP-33. PACTEL has been upgraded and modified on a case-by-case basis. The latest facility configuration, the PWR PACTEL facility, was constructed for research activities associated with the EPR-type reactor. A significant design basis is to utilize certain parts of PACTEL, and at the same time, to focus on a proper construction of two new loops and vertical steam generators with an extensive instrumentation. The PWR PACTEL benchmark exercise was launched in 2010 with a small break loss-of-coolant accident test as the chosen transient. Both facilities, PACTEL and PWR PACTEL, are maintained fully operational side by side.

  5. Secondary-side feed-and-bleed effectiveness in pressurized water reactors

    International Nuclear Information System (INIS)

    Annunziato, A.

    1994-01-01

    An analysis is presented of physical phenomena occurring during secondary-side feed-and-bleed, which is being considered as an accident management procedure for pressurized water reactors. Problem areas related to the reliability of this procedure are identified and discussed. Secondary-side feed-and-bleed, as examined in the LOBI (which is the Light Water Reactor Off-Normal Behavior Investigation) integral system test facility, was not successful because of a delay in the secondary-side heat removal caused by the release of stored heat from the steam generator downcomer wall. Countercurrent flow limiting in the hot leg was another major phenomenon that can influence the effectiveness of this procedure. The discussion of the experimental results is complemented by relevant calculations by RELAP5/MOD3. In general, it was found that the effectiveness of the feed-and-bleed procedure is maximized if the number of steam generators used to implement it is reduced

  6. Secondary side TSP deposit buildup: lab test investigation focused on electrokinetic considerations

    International Nuclear Information System (INIS)

    Barale, M.; Guillodo, M.; Foucault, M.; Ryckelynck, N.; Clinard, M-H.; Chahma, F.; Brun, C.; Corredera, G.

    2010-01-01

    Deposit buildup which caused the clogging of the 'foils' of the upper tube-support-plates (TSP) inside a PWR steam generator of French NPPs in 2006 presents certain similarities with deposits observed in lab tests performed in secondary coolant chemistry at the Technical Centre of AREVA NP in 2002. The mechanism of TSP clogging seems not to present obvious phenomenological links with the fouling of the free span of SG since deposits buildup is quite uniform and is currently related to a surface boiling effect due to the surface heat flux. A specific mechanism could account for TSP clogging. In particular, electrokinetic effects were investigated by EDF-CEIDRE and AREVA NP SAS in the framework of a lab test program started in 2007. The electrokinetic approach is to consider that the coupling of local hydrodynamic and surface electrochemistry could lead to the formation of a very localized and heterogeneous deposit at the leading edge between both TSP and SG tubing material. Electrokinetic effects can lead to the oxidation and/or the precipitation of ferrous ions and to a variation of the electrokinetic potential which can produce strong attraction of iron oxide colloids. These electrokinetic effects are dependent of the T/H and local hydrodynamic conditions and surface electrochemistry explaining. The objective of this EDF-AREVA lab test program is to investigate the role of secondary chemistry coolant (pH, DH, N 2 H 4 , amine, redox) and of the nature of materials (SS, Ni base alloy) on deposit buildup. Properties of oxide surface and zeta potential of oxidized metallic materials have been also determined at temperature to understand their potential contribution on mechanism of TSP clogging in secondary side chemistry coolant. In this paper, a set of specific experiments carried out in this frame have been presented and discussed, paying particular attention to the effects of electrokinetic considerations and surface charges at oxide-solution interfaces

  7. Secondary side TSP deposit buildup: lab test investigation focused on electrokinetic considerations

    Energy Technology Data Exchange (ETDEWEB)

    Barale, M.; Guillodo, M.; Foucault, M., E-mail: Morgan.Barale@areva.com [AREVA NP SAS, Technical Centre, Le Creusot (France); Ryckelynck, N.; Clinard, M-H.; Chahma, F.; Brun, C. [AREVA NP SAS, Chemistry and Radiochemistry Group, Paris (France); Corredera, G. [Electricite de France, Centre d' Expertise et d' Inspection dans les domaines de la Realisation et de l' Exploitation, Saint-Denis (France)

    2010-07-01

    Deposit buildup which caused the clogging of the 'foils' of the upper tube-support-plates (TSP) inside a PWR steam generator of French NPPs in 2006 presents certain similarities with deposits observed in lab tests performed in secondary coolant chemistry at the Technical Centre of AREVA NP in 2002. The mechanism of TSP clogging seems not to present obvious phenomenological links with the fouling of the free span of SG since deposits buildup is quite uniform and is currently related to a surface boiling effect due to the surface heat flux. A specific mechanism could account for TSP clogging. In particular, electrokinetic effects were investigated by EDF-CEIDRE and AREVA NP SAS in the framework of a lab test program started in 2007. The electrokinetic approach is to consider that the coupling of local hydrodynamic and surface electrochemistry could lead to the formation of a very localized and heterogeneous deposit at the leading edge between both TSP and SG tubing material. Electrokinetic effects can lead to the oxidation and/or the precipitation of ferrous ions and to a variation of the electrokinetic potential which can produce strong attraction of iron oxide colloids. These electrokinetic effects are dependent of the T/H and local hydrodynamic conditions and surface electrochemistry explaining. The objective of this EDF-AREVA lab test program is to investigate the role of secondary chemistry coolant (pH, DH, N{sub 2}H{sub 4}, amine, redox) and of the nature of materials (SS, Ni base alloy) on deposit buildup. Properties of oxide surface and zeta potential of oxidized metallic materials have been also determined at temperature to understand their potential contribution on mechanism of TSP clogging in secondary side chemistry coolant. In this paper, a set of specific experiments carried out in this frame have been presented and discussed, paying particular attention to the effects of electrokinetic considerations and surface charges at oxide

  8. Quasi-resonant converter with divided resonant capacitor on primary and secondary side

    OpenAIRE

    Shiroyama, Hironobu; Matsuo, Hirofumi; Ishizuka, Yoichi

    2009-01-01

    This paper presents a quasi-resonant converter with divided resonant capacitor on primary and secondary side of the isolation transformer. A conventional quasi-resonant converter using flyback topology can realize soft switching with simple circuit. However, relatively large surge voltage is generated in the switching device. To suppress such surge voltage, resonant capacitor is divided on primary side and secondary side in the proposed converter. In case of prototype 95W converter, the volta...

  9. Thermal-hydraulic analysis of NSSS and containment response during extended station blackout for Maanshan PWR plant

    Energy Technology Data Exchange (ETDEWEB)

    Yuann, Yng-Ruey, E-mail: ryyuann@iner.gov.tw; Hsu, Keng-Hsien, E-mail: hardlycampus@iner.gov.tw; Lin, Chin-Tsu, E-mail: jtling@iner.gov.tw

    2015-07-15

    Highlights: • Calculate NSSS and containment transient response during extended SBO of 24 h. • RELAP5-3D and GOTHIC models are developed for Maanshan PWR plant. • Reactor coolant pump seal leakage is specifically modeled for each loop. • Analyses are performed with and without secondary-side depressurization, respectively. • Considering different total available time for turbine driven auxiliary feedwater system. - Abstract: A thermal-hydraulic analysis has been performed with respect to the response of the nuclear steam supply system (NSSS) and the containment during an extended station blackout (SBO) duration of 24 h in Maanshan PWR plant. Maanshan plant is a Westinghouse three-loop PWR design with rated core thermal power of 2822 MWt. The analyses in the NSSS and the containment are based on the RELAP5-3D and GOTHIC models, respectively. Important design features of the plant in response to SBO are considered in the respective models, e.g., the steam generator PORVs, turbine driven auxiliary feedwater system (TDAFWS), accumulators, reactor coolant pump (RCP) seal design, various heat structures in the containment, etc. In the analysis it is assumed that the shaft seal in each RCP failed due to loss of seal cooling and the RCS fluid flows to the containment directly. Some parameters calculated from the RELPA5-3D model are input to the containment GOTHIC model, including the RCS average temperature and the RCP seal leakage flow and enthalpy. The RCS average temperature is used to drive the sensible heat transfer to the containment. It is found that the severity of the event depends mainly on whether the secondary side is depressurized or not. If the secondary side is depressurized in time (within 1 h after SBO) and the TDAFWS is available greater than 19 h, then the reactor core will be covered with water throughout the SBO duration, which ensures the integrity of the reactor core. On the contrary, if the secondary side is not depressurized, then the RCS

  10. Perspective of the Westinghouse steam generator secondary side maintenance approach

    Energy Technology Data Exchange (ETDEWEB)

    Ramaley, D. [Westinghouse Electric Company LLC, Cranberry Township, Pennsylvania (United States)

    2012-07-01

    Historically, Westinghouse had developed a set of steam generator secondary maintenance guidelines focused around performing recurring activities each outage without direct regards to the age, deposit loading, operational status, or corrosion status of the steam generator. Through the evolution of steam generator design and steam generator condition data, Westinghouse now uses a proactive assessment and planning approach for utilities. Westinghouse works with utilities to develop steam generator secondary maintenance plans for long term steam generator viability. Westinghouse has developed a portfolio of products to allow utilities to optimize steam generator operability and develop programs aimed at maintaining the steam generator secondary side in a favorable condition for successful long term operation. Judicious use of the means available for program development should allow for corrosion free operation, long term full power operation at optimum thermal efficiency, and leveling of outage expenditures over a long period of time. This paper will review the following required elements for an effective steam generator secondary side strategy: • Assessment: In order to develop an appropriate maintenance strategy, actions must be taken to obtain an accurate picture of the SG secondary side condition. • Forecasting: Using available data predictions are developed for future steam generator conditions and required maintenance actions. • Action: Cost effective engineering and maintenance actions must be completed at the appropriate time as designated by the plan. • Evaluation of Results: Following execution of maintenance tactics, it is necessary to revise strategy and develop technology enhancements as appropriate. (author)

  11. Implementation in free software of the PWR type university nucleo electric simulator (SU-PWR); Implementacion en software libre del simulador universitario de nucleoelectrica tipo PWR (SU-PWR)

    Energy Technology Data Exchange (ETDEWEB)

    Valle H, J.; Hidago H, F.; Morales S, J.B. [UNAM, Laboratorio de Analisis de Ingenieria de Reactores Nucleares DEPFI, Campus Morelos, en IMTA Jiutepec, Morelos (Mexico)]. e-mail: julfi_jg@yahoo.com.mx

    2007-07-01

    Presently work is shown like was carried out the implementation of the University Simulator of Nucleo-electric type PWR (SU-PWR). The implementation of the simulator was carried out in a free software simulation platform, as it is Scilab, what offers big advantages that go from the free use and without cost of the product, until the codes modification so much of the system like of the program with the purpose of to improve it or to adapt it to future routines and/or more advanced graphic interfaces. The SU-PWR shows the general behavior of a PWR nuclear plant (Pressurized Water Reactor) describing the dynamics of the plant from the generation process of thermal energy in the nuclear fuel, going by the process of energy transport toward the coolant of the primary circuit the one which in turn transfers this energy to the vapor generators of the secondary circuit where the vapor is expanded by means of turbines that in turn move the electric generator producing in this way the electricity. The pressurizer that is indispensable for the process is also modeled. Each one of these stages were implemented in scicos that is the Scilab tool specialized in the simulation. The simulation was carried out by means of modules that contain the differential equation that mathematically models each stage or equipment of the PWR plant. The result is a series of modules that based on certain entrances and characteristic of the system they generate exits that in turn are the entrance to other module. Because the SU-PWR is an experimental project in early phase, it is even work and modifications to carry out, for what the models that are presented in this work can vary a little the being integrated to the whole system to simulate, but however they already show clearly the operation and the conformation of the plant. (Author)

  12. Wall thinning trend analyses for secondary side piping of Korean NPPs

    International Nuclear Information System (INIS)

    Hwang, K.M.; Jin, T.E.; Lee, S.H.; Jeon, S.C.

    2003-01-01

    Since the mid-1990s, nuclear power plants in Korea have experienced wall thinning, leaks, and ruptures of secondary side piping caused by flow-accelerated corrosion (FAC). The pipe failures have increased as operating time progresses. In order to prevent the FAC-induced pipe failures and to develop an effective FAC management strategy, KEPRI and KOPEC have conducted a study for developing systematic FAC management technology for secondary side piping of all Korean nuclear power plants. As a part of the study, FAC analyses were performed using the CHECWORKS code. The analysis results were used to select components for inspection and to determine inspection intervals on each nuclear power plant. This paper describes the introduction of the FAC analysis method and the wall thinning trend analysis results by reactor type, system, and water treatment amine. This paper also represents the site application feasibility for secondary side piping management. The site application feasibility of the analysis results was proven by comparisons of predicted and measured wear rates. (author)

  13. Chemical cleaning of nuclear (PWR) steam generators

    International Nuclear Information System (INIS)

    Welty, C.S. Jr.; Mundis, J.A.

    1982-01-01

    This paper reports on a significant research program sponsored by a group of utilities (the Steam Generator Owners Group), which was undertaken to develop a process to chemically remove corrosion product deposits from the secondary side of pressurized water reactor (PWR) power plant steam generators. Results of this work have defined a process (solvent system and application methods) that is capable of removing sludge and tube-to-tube support plate crevice corrosion products generated during operation with all-volatile treatment (AVT) water chemistry. Considers a plant-specific test program that includes all materials in the steam generator to be cleaned and accounts for the physical locations (proximity and contact) of those materials. Points out that prior to applying the process in an operational unit, the utility, with the participation of the NSSR vendor, must define allowable total corrosion to the materials of construction of the unit

  14. Analysis of the VVER-440 reactor steam generator secondary side with the RELAP5/MOD3 code

    International Nuclear Information System (INIS)

    Tuunanen, J.

    1993-01-01

    Nuclear Engineering Laboratory of the Technical Research Centre of Finland has widely used RELAP5/MOD2 and -MOD3 codes to simulate horizontal steam generators. Several models have been developed and successfully used in the VVER-safety analysis. Nevertheless, the models developed have included only rather few nodes in the steam generator secondary side. The secondary side has normally been divided into about 10 to 15 nodes. Since the secondary side at the steam generators of VVER-440 type reactors consists of a rather large water pool, these models were only roughly capable to predict secondary side flows. The paper describes an attempt to use RELAP5/MOD3 code to predict secondary side flows in a steam generator of a VVER-440 reactor. A 2D/3D model has been developed using RELAP5/MOD3 codes cross-flow junctions. The model includes 90 volumes on the steam generator secondary side. The model has been used to calculate steady state flow conditions in the secondary side of a VVER-440 reactor steam generator. (orig.) (1 ref., 9 figs., 2 tabs.)

  15. Long-Term Station Blackout Accident Analyses of a PWR with RELAP5/MOD3.3

    Directory of Open Access Journals (Sweden)

    Andrej Prošek

    2013-01-01

    Full Text Available Stress tests performed in Europe after accident at Fukushima Daiichi also required evaluation of the consequences of loss of safety functions due to station blackout (SBO. Long-term SBO in a pressurized water reactor (PWR leads to severe accident sequences, assuming that existing plant means (systems, equipment, and procedures are used for accident mitigation. Therefore the main objective was to study the accident management strategies for SBO scenarios (with different reactor coolant pumps (RCPs leaks assumed to delay the time before core uncovers and significantly heats up. The most important strategies assumed were primary side depressurization and additional makeup water to reactor coolant system (RCS. For simulations of long term SBO scenarios, including early stages of severe accident sequences, the best estimate RELAP5/MOD3.3 and the verified input model of Krško two-loop PWR were used. The results suggest that for the expected magnitude of RCPs seal leak, the core uncovery during the first seven days could be prevented by using the turbine-driven auxiliary feedwater pump and manually depressurizing the RCS through the secondary side. For larger RCPs seal leaks, in general this is not the case. Nevertheless, the core uncovery can be significantly delayed by increasing RCS depressurization.

  16. First application of hollow fiber filter for PWR condensate polishing

    International Nuclear Information System (INIS)

    Tsuda, S.; Otoha, K.; Takiguchi, H.

    2002-01-01

    In Tsuruga Unit-2 (PWR 1160 MWe commenced commercial operation in 1987), current procedure for secondary system clean-up before start-up had prolonged outage time and had consumed a huge amount of de-ionized (DI) water. In addition, iron oxide in condensate had accelerated the degradation of condensate demineralizer (CD) resin. The corrosion product of iron could also influence the secondary side corrosion of steam generator (SG) tubing if it intruded into SG through CD. To solve these problems, Japan Atomic Power Company (JAPC) decided to introduce hollow fiber filter (HFF) type condensate filter into Tsuruga-2, as the first application to PWR in the world. Because of retro-fitted HFF in Tsuruga Unit-2, limitations for installation space and flow resistance in condensate system and cost reduction required new design for compact and low differential pressure system and for long life filter module. JAPC and ORGANO assessed methodologies to achieve these goals. An advanced HFF system, including a newly developed compact HFF module design, was installed at Tsuruga Unit-2 in 1997 based on the assessment. During the 5 years since the installation, the HFF system has provided excellent crud removal that enables to shorten the outage period and to reduce DI water consumption drastically. Stable differential pressure (dP) trend of the HFF system indicates an expected module life of more than 7 years, with backwash cleaning required only 2 or 3 times per year. In addition to providing the expected operating cost reduction and improved SG tube integrity, numerous additional benefits have resulted from the retrofit. (authors)

  17. Measures introduced for improving the resistance against degradation by corrosion of steam generators in Framatome designed PWR'S

    International Nuclear Information System (INIS)

    Smith, K.; Slama, G.; Sort, M.

    1986-01-01

    The operational experience of FRAMATOME plants now extends to more than 8 years with a total of 35 PWR plants commissioned and in operation for periods of time varying from 1 to 7.5 years. Overall, the 1.600 Steam Generator (S.G.) tubes are significantly free from secondary side corrosion problems. On the primary side, several instances of stress corrosion cracking have occurred, this cracking is principally at the transitions of the mechanical roll in 1.600 Mill Annealed tubing. This paper reviews the design and material changes which have been, or are being, introduced to improve the resistance to corrosion. In addition, the application is described of the FRAMATOME shot peening surface treatment to the primary side tube surface of the mechanically rolled expansions. The objective of this treatment is to increase the resistance to primary side stress corrosion cracking by appreciable reduction of the surface tensile stresses. The steam generators of several operational plants have been successfully treated by this technique

  18. PWR steam generator chemical cleaning, Phase I. Final report

    International Nuclear Information System (INIS)

    Rothstein, S.

    1978-07-01

    United Nuclear Industries (UNI) entered into a subcontract with Consolidated Edison Company of New York (Con Ed) on August 8, 1977, for the purpose of developing methods to chemically clean the secondary side tube to tube support crevices of the steam generators of Indian Point Nos. 1 and 2 PWR plants. This document represents the first reporting on activities performed for Phase I of this effort. Specifically, this report contains the results of a literature search performed by UNI for the purpose of determining state-of-the-art chemical solvents and methods for decontaminating nuclear reactor steam generators. The results of the search sought to accomplish two objectives: (1) identify solvents beyond those proposed at present by UNI and Con Ed for the test program, and (2) confirm the appropriateness of solvents and methods of decontamination currently in use by UNI

  19. A computer code (MONA) for pH and chemistry evaluation in the secondary system water of PWR

    International Nuclear Information System (INIS)

    Nordmann, F.

    1983-01-01

    Many corrosion phenomena of the PWR secondary system materials, strongly depend on the pH of the fluid. On operating plants, only room temperature pH of the bulk water can be measured. The knowledge of the pH at the operating temperature and its relationship with the measured value is therefore particularly interesting. In addition, an evaluation of the local chemistry in flow-restricted areas of the steam generator (SG) where drastic corrosion generally occurs, is of utmost concern. The MONA code has been developed to compute the secondary water pH in the following cases: at temperatures ranging from 0 to 320 deg C; at any concentration of ammonia; at any amount of pollutants such as sea water, river water (from condenser leak), and/or sodium, chloride, sulfate (from demineralization resins); with possible addition of calcium hydroxide or boric acid in order to inhibit denting or intergranular attack. (author)

  20. Calculation model for 16N transit time in the secondary side of steam generators

    International Nuclear Information System (INIS)

    Liu Songyu; Xu Jijun; Xu Ming

    1998-01-01

    The 16 N transit time is essential to determine the leak-rate of steam generator tubes leaks with 16 N monitoring system, which is a new technique. A model was developed for calculation 16 N transit time in the secondary side of steam generators. According to the flow characters of secondary side fluid, the transit times divide into four sectors from tube sheet to the sensor on steam line. The model assumes that 16 N is moving as vapor phase in the secondary-side. So the model for vapor velocity distribution in tube bundle is presented in detail. The 16 N transit time calculation results of this model compare with these of EDF on steam generator of Qinshan NPP

  1. Implementation in free software of the PWR type university nucleo electric simulator (SU-PWR)

    International Nuclear Information System (INIS)

    Valle H, J.; Hidago H, F.; Morales S, J.B.

    2007-01-01

    Presently work is shown like was carried out the implementation of the University Simulator of Nucleo-electric type PWR (SU-PWR). The implementation of the simulator was carried out in a free software simulation platform, as it is Scilab, what offers big advantages that go from the free use and without cost of the product, until the codes modification so much of the system like of the program with the purpose of to improve it or to adapt it to future routines and/or more advanced graphic interfaces. The SU-PWR shows the general behavior of a PWR nuclear plant (Pressurized Water Reactor) describing the dynamics of the plant from the generation process of thermal energy in the nuclear fuel, going by the process of energy transport toward the coolant of the primary circuit the one which in turn transfers this energy to the vapor generators of the secondary circuit where the vapor is expanded by means of turbines that in turn move the electric generator producing in this way the electricity. The pressurizer that is indispensable for the process is also modeled. Each one of these stages were implemented in scicos that is the Scilab tool specialized in the simulation. The simulation was carried out by means of modules that contain the differential equation that mathematically models each stage or equipment of the PWR plant. The result is a series of modules that based on certain entrances and characteristic of the system they generate exits that in turn are the entrance to other module. Because the SU-PWR is an experimental project in early phase, it is even work and modifications to carry out, for what the models that are presented in this work can vary a little the being integrated to the whole system to simulate, but however they already show clearly the operation and the conformation of the plant. (Author)

  2. Results of the secondary side chemical cleaning of the steam generators

    International Nuclear Information System (INIS)

    Doma, A.; Patek, G.

    2001-01-01

    A significant amount of deposit has developed on the secondary side of the heat transfer tubes of the steam generators (SG) of the Paks Nuclear Power Plant units in course of the years. More than 99.5% of the deposit is made up of magnetite (Fe 3 O 4 ) generated in the secondary circuit of the power plant. Those deposits lead to the decrease of the heat transfer. Even more important is its role from the point of view of operational reliability of the steam generators, leak tightness between the primary and secondary sides. The first series of cleaning took place following 8-9 years of operation of the units. Following the first cleaning cycle the transport of the corrosion products into the steam generators did not change, and thus obviously new cleaning was required. Periodical cleaning of the steam generators shall be assured. (R.P.)

  3. A Multi-Physics PWR Model for the Load Following

    OpenAIRE

    Muniglia , Mathieu; Do , Jean-Michel; Jean-Charles , Le Pallec; Grard , Hubert; Verel , Sébastien; David , S.

    2016-01-01

    International audience; In this paper, a new model of a Pressurized Water Reactor (PWR) is described. This model includes the description of the core as well as a simplified secondary loop: the goal is to reproduce a load-following type transient, where the output power of the plant is controlled by the electric grid. Consequently, the control systems are also modeled, as the control rods or the soluble boron. The reference power plant is a 1300MW electrical PWR, managed with the french G mode.

  4. Experimental and numerical study of deposit formation in secondary side SG TSP by electrokinetic approach

    International Nuclear Information System (INIS)

    Guillodo, Michael; Foucault, Marc; Ryckelynck, Natacha; Chahma, Farah; Guingo, Mathieu; Mansour, Carine; Alos-Ramos, Olga; Corredera, Geraldine

    2012-09-01

    Corrosion products deposit formation observed in PWR steam generators (SGs) - related to SG free span fouling and SG clogging - is now reported since several years. SG clogging is a localized phenomenon observed between the leading edge of the Tube Support Plate (TSP) and SG tubing materials. Based on visual inspections, it was found that the gaps between SG tubing material and TSP at the lower part of the broached holes were getting progressively blocked. Therefore, for safe operation, most affected PWRs had to be operated at reduced power. TSP blockage was mainly observed for low-pH water chemistry conditioning, which directly depends on the operating water chemistry. The TSP blockage mechanism is complex due to the localized conditions in which flow pattern change, chemistry and electrochemical conditions are not well understood. Electrokinetic considerations could be pointed out to explain the coupling of chemistry, materials and thermohydraulic (T/H) conditions. In this frame AREVA and EDF have launched a long-term R and D program in order to understand the mechanisms driving the formation of SG clogging. This study based on parametric laboratory tests aims to assess the role of secondary water chemistry, material and T/H conditions on deposit formation. The experimental approach focused on electrokinetic measurements of metallic substrates and on the assessment of oxidation properties of materials in secondary side chemistry. An overall analysis of recent results is presented to address SG deposit formation in secondary water chemistry for various conditioning amines - morpholine, ethanolamine and dimethylamine. To complete the study, the experimental results have been correlated to CFD simulations of particle deposition, by means of stochastic Lagrangian models. These calculations have in particular reproduced correctly the location of the most important particle deposit (the leading edge of the test tube), and have stressed the influence of the

  5. Precipitation of iron species on the cold side of PWR steam generator and its possible correlation to dose rate elevation

    International Nuclear Information System (INIS)

    Bengtsson, Bernt; Chen, Jiaxin; Andersson, Petter

    2014-01-01

    For the last 10 years of service of Ringhals PWR unit 4, operating with Alloy-600MA steam generator tubing materials and a coolant pH of 7.2 (a)300°C, the cold water channel heads experienced continuous dose rate elevation. In the hot parts, however, it remained stable. Similar observations were made in Ringhals unit 2 and 3 after SGR to Alloy 690 and sometimes in other PWRs operated at similarly 'low' pH-regime. Following the introduction of elevated pH regime at Ringhals PWRs the cold side dose rates dropped to the similar levels as on the hot side. The phenomena are analysed in this paper from three different aspects: (1) the general plant observations in dose rate development under different coolant pH regimes; (2) the concentrations of dissolved and soluble iron species at the low and high coolant pH values and (3) the microstructures of the oxide films formed on the cold and hot sides of a steam generator tube pulled from a retired steam generator. Based on the analyses a hypothesis is elaborated that the formation of a thin but highly radioactive layer of iron-rich oxide deposit on the cold side may be responsible for the dose rate elevation and that its formation may be harder at the elevated pH regime. (author)

  6. Modeling on a PWR power conversion system with system program

    International Nuclear Information System (INIS)

    Gao Rui; Yang Yanhua; Lin Meng

    2007-01-01

    Based on the power conversion system of nuclear and conventional islands of Daya Bay Power Station, this paper models the thermal-hydraulic systems of primary and secondary loops for PWR by using the PWR best-estimate program-RELAP5. To simulate the full-scope power conversion system, not only the traditional basic system models of nuclear island, but also the major system models of conventional island are all considered and modeled. A comparison between the calculated results and the actual data of reactor demonstrates a fine match for Daya Bay Nuclear Power Station, and manifests the feasibility in simulating full-scope power conversion system of PWR by RELAP5 at the same time. (authors)

  7. The temperature control and water quality regulation for steam generator secondary side hydrostatic test

    International Nuclear Information System (INIS)

    Xiao Bo; Liu Dongyong

    2014-01-01

    The secondary side hydrostatic test for the steam generator of M310 unit is to verify the pressure tightness of steam generator secondary side tube sheet and related systems. As for the importance of the steam generator, the water temperature and water quality of hydrostatic test has strict requirements. The discussion on the water temperature control and water quality regulation for the secondary loop hydrostatic test of Fuqing Unit 1 contribute greatly to the guiding work for the preparation of the steam generator pressure test for M310 unit. (authors)

  8. The application of film-forming amines in secondary side chemistry treatment of NPPs

    International Nuclear Information System (INIS)

    Ramminger, Ute; Hoffmann-Wankerl, Stephan; Fandrich, Joerg

    2012-09-01

    World wide a number of nuclear power plants are in operation with steam-water cycles based on a mixed metallurgy concept and / or a non-optimal Balance-of-Plant (BoP) design. Together with limitations of the applied water chemistry treatment, these conditions could enforce the enrichment of impurities, which will be accumulated in the tube sheet region of the steam generators and thus form an aggressive environment with respect to corrosion of steam generator construction materials. The use of surface active agents like film forming amines (FFA) has become widely recognized in the fossil power plant sector, showing a decrease of corrosion product generation by improving the surface conditions. The adherent non wettable film acts as a shield that limits the access of water and hydrated species to the metal or metal oxide surface. This barrier lowers the corrosion rate by inhibiting the mass transfer between surface and solution. This paper deals with the application of film forming amines as complementary conditioning agents in the steam-water cycle of a PWR. The decision for complementing the existing secondary side water chemistry treatment with a controlled and time limited application of film forming amines was part of a project, which has been developed by a pilot plant with PWRs of western design and AREVA NP GmbH. The performance and conditions of the steam generators in those units should be improved. It covers the results of the application with respect to corrosion product transport control, minimization of impurity accumulation in the SGs and improved plant performance. (authors)

  9. Dry Ice Blast Decontamination to in-service equipment in Japanese PWR plant

    International Nuclear Information System (INIS)

    2016-01-01

    MHI had developed several mechanical decontamination methods. Mechanical decontamination is beneficial when it is applied to equipment whose surface is narrow. Especially in terms of secondary waste reduction, MHI started the study of application of Dry Ice Blast Decontamination to actual PWR plant. This paper provides an introduction to Dry Ice Blast Decontamination principle, its system and actual application result to PWR plant. (J.P.N.)

  10. Novice in Secondary School--The Coin Has Two Sides

    Science.gov (United States)

    Ulvik, Marit; Smith, Kari; Helleve, Ingrid

    2009-01-01

    The aim of this study is to gain an insight into novice teachers' diverse experiences. The study is conducted among nine beginning teachers in upper secondary school in Norway, and the research instrument was semi structured interviews. The main findings indicate that there are two sides of the coin of being a new teacher, positive as well as less…

  11. Experimental study on secondary depressurization action for PWR vessel bottom small break LOCA with HPI failure and gas inflow (ROSA-V/LSTF test SB-PV-03)

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Takeda, Takeshi; Asaka, Hideaki; Nakamura, Hideo

    2005-06-01

    A small break loss-of-coolant accident (SBLOCA) experiment was conducted at the Large Scale Test Facility (LSTF) of ROSA-V program to study effects of accident management (AM) measures on core cooling, which is important in case of high pressure injection (HPI) system failure during an SBLOCA at a pressurized water reactor (PWR). The LSTF is a full-height and 1/48 volume-scaled facility simulating 4-loop Westinghouse-type PWR (3423 MWt). The experiment, SB-PV-03, simulated a PWR vessel bottom SBLOCA with a rupture of ten instrument-tubes which is equivalent to 0.2% cold leg break. Total HPI failure, non-condensable gas inflow from accumulator injection system (AIS) and operator AM actions on steam generator (SG) secondary depressurization at a rate of -55 K/h and auxiliary feedwater (AFW) supply for 30 minutes were assumed as experiment conditions. It is clarified that the AM actions are effective on primary system depressurization until the end of AIS injection at 1.6 MPa, but thereafter become less effective due to inflow of the non-condensable gas, resulting in delay of low pressure injection (LPI) actuation and whole core heatup under continuous water discharge through the bottom break. The report describes these thermohydraulic phenomena related with transient primary coolant mass and AM actions in addition to estimation of non-condensable gas behavior which affected primary-to-secondary heat transfer. (author)

  12. A comparison of fuzzy logic-PID control strategies for PWR pressurizer control

    International Nuclear Information System (INIS)

    Kavaklioglu, K.; Ikonomopoulos, A.

    1993-01-01

    This paper describes the results obtained from a comparison performed between classical proportional-integral-derivative (PID) and fuzzy logic (FL) controlling the pressure in a pressurized water reactor (PWR). The two methodologies have been tested under various transient scenarios, and their performances are evaluated with respect to robustness and on-time response to external stimuli. One of the main concerns in the safe operation of PWR is the pressure control in the primary side of the system. In order to maintain the pressure in a PWR at the desired level, the pressurizer component equipped with sprayers, heaters, and safety relief valves is used. The control strategy in a Westinghouse PWR is implemented with a PID controller that initiates either the electric heaters or the sprayers, depending on the direction of the coolant pressure deviation from the setpoint

  13. 9 m side drop test of scale model

    International Nuclear Information System (INIS)

    Ku, Jeong-Hoe; Chung, Seong-Hwan; Lee, Ju-Chan; Seo, Ki-Seog

    1993-01-01

    A type B(U) shipping cask had been developed in KAERI for transporting PWR spent fuel. Since the cask is to transport spent PWR fuel, it must be designed to meet all of the structural requirements specified in domestic packaging regulations and IAEA safety series No.6. This paper describes the side drop testing of a one - third scale model cask. The crush and deformations of the shock absorbing covers directly control the deceleration experiences of the cask during the 9 m side drop impact. The shock absorbing covers greatly mitigated the inertia forces of the cask body due to the side drop impact. Compared with the side drop test and finite element analysis, it was verified that the 1/3 scale model cask maintain its structural integrity of the model cask under the side drop impact. The test and analysis results could be used as the basic data to evaluate the structural integrity of the real cask. (J.P.N.)

  14. A genetic algorithm applied to a PWR turbine extraction optimization to increase cycle efficiency

    International Nuclear Information System (INIS)

    Sacco, Wagner F.; Schirru, Roberto

    2002-01-01

    In nuclear power plants feedwater heaters are used to heat feedwater from its temperature leaving the condenser to final feedwater temperature using steam extracted from various stages of the turbines. The purpose of this process is to increase cycle efficiency. The determination of the optimal fraction of mass flow rate to be extracted from each stage of the turbines is a complex optimization problem. This kind of problem has been efficiently solved by means of evolutionary computation techniques, such as Genetic Algorithms (GAs). GAs, which are systems based upon principles from biological genetics, have been successfully applied to several combinatorial optimization problems in nuclear engineering, as the nuclear fuel reload optimization problem. We introduce the use of GAs in cycle efficiency optimization by finding an optimal combination of turbine extractions. In order to demonstrate the effectiveness of our approach, we have chosen a typical PWR as case study. The secondary side of the PWR was simulated using PEPSE, which is a modeling tool used to perform integrated heat balances for power plants. The results indicate that the GA is a quite promising tool for cycle efficiency optimization. (author)

  15. Effect of water chemistry on deposition for PWR plant operation

    International Nuclear Information System (INIS)

    Le Calvar, Marc; Bretelle, J. L.; Cailleaux, J. P.; Lacroix, R.; Guivarch, M.; Gay, N.; Taunier, S.; Gressier, F.; Varry, P.; Corredera, G.; Alos-Ramos, O.; Dijoux, M.

    2012-09-01

    For Pressurized Water Reactor (PWR) operation, water chemistry guidelines, specifications and associated surveillance programs are key to avoid deposition of oxides. Deposition of oxides can be detrimental by disrupting results of flow measurements, decreasing the thermal exchange capacity, or even by impairing safety. This paper describes the most important cases of deposition, their consequences for operation, and the implemented improvements to avoid their reoccurrence. Deposition that led to a Crud Induced Power Shift (CIPS) is also described. In the primary and in the secondary sides, orifice plates are typically used for measuring feedwater flow rate in nuclear power plants. Feedwater flow rates are used for control purposes and are important safety parameters as they are used to determine the plant's operating power level. Fouling of orifice plates in the primary side has been found during surveillance testing. For reactor coolant pumps, the formation of deposits on the seal No.1 can cause abnormally high or low leak rates through the seal. The leak rate through this seal must be carefully maintained within a prescribed range during plant operation. In the secondary side, orifice plate fouling has been the cause of feedwater flow/reference thermal power drift. For the steam generators (SG), magnetite deposition has led to fouling of the tube bundle, clogging of the quadri-foiled support plate holes and hard sludge formation on the base plate. For the generators, copper hollow conductors are widely used. Buildup of copper oxides on the interior walls of copper conductors has caused insufficient heat transfer. All these deposition cases have received adequate attention, understanding and response via improvement of our surveillance programs. (authors)

  16. Secondary side photographic techniques used in characterization of Surry steam generator

    International Nuclear Information System (INIS)

    Sinclair, R.B.

    1984-10-01

    Characterization of the generator's secondary side prior to destructive removal of tubing presents a significant challenge. Information must be obtained in a radioactive field (up to 15 R/h) throughout the tightly spaced bundle of steam generator tubes. This report discusses the various techniques employed, along with their respective advantages and disadvantages. The most successful approach to nondestructive secondary side characterization and documentation was through use of in-house developed pinhole cameras. These devices provided accurate photographic documentation of generator condition. They could be fabricated in geometries allowing access to all parts of the generator. Semi-remote operation coupled with large area coverage per investigation and short at-location times resulted in significant personnel exposure advantages. The fabrication and use of pinhole cameras for remote inspection is discussed in detail

  17. Numerical modeling of secondary side thermohydraulics of horizontal steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Melikhov, V.I.; Melikhov, O.I.; Nigmatulin, B.I. [Research and Engineering Centre of LWR Nuclear Plants Safety, Moscow (Russian Federation)

    1995-12-31

    A mathematical model for the transient three-dimensional secondary side thermal hydraulics of the horizontal steam generator has been developed. The calculations of the steam generator PGV-1000 and PGV-4 nominal regimes and comparison of numerical and experimental results have been carried out. 7 refs.

  18. Numerical modeling of secondary side thermohydraulics of horizontal steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Melikhov, V I; Melikhov, O I; Nigmatulin, B I [Research and Engineering Centre of LWR Nuclear Plants Safety, Moscow (Russian Federation)

    1996-12-31

    A mathematical model for the transient three-dimensional secondary side thermal hydraulics of the horizontal steam generator has been developed. The calculations of the steam generator PGV-1000 and PGV-4 nominal regimes and comparison of numerical and experimental results have been carried out. 7 refs.

  19. NPP Temelin automatic monitoring and diagnostic system of secondary side of the unit 1

    International Nuclear Information System (INIS)

    Heidenreich, S.; Pisl, M.; Drab, F.

    1997-01-01

    Two measuring and evaluating systems by SKODA PRAHA are described, designed for the Temelin nuclear power plant: a permanent secondary side diagnostic system for technology monitoring in the period of startup and operation; and the system of physical and power starting-up for monitoring during the first and repeated startup. The purposes of both systems are outlined. The scope of diagnostics covered and the functioning of the secondary side system is dealt with in some detail. (A.K.)

  20. Industrywide survey of PWR organics. Final report

    International Nuclear Information System (INIS)

    Richards, J.E.; Byers, W.A.

    1986-07-01

    Thirteen Pressurized Water reactor (PWR) secondary cycles were sampled for organic acids, total organic carbon, and inorganic anions. The distribution and removal of organics in a makeup water treatment system were investigted at an additional plant. TOC analyses were used for the analysis of makeup water systems; anion ion chromatography and ion exclusion chromatography were used for the analysis of secondary water systems. Additional information on plant operation and water chemistry was collected in a survey. The analytical and survey data were compared and correlations made

  1. Leak before break application in French PWR plants under operation

    Energy Technology Data Exchange (ETDEWEB)

    Faidy, C. [EDF SEPTEN, Villeurbanne (France)

    1997-04-01

    Practical applications of the leak-before break concept are presently limited in French Pressurized Water Reactors (PWR) compared to Fast Breeder Reactors. Neithertheless, different fracture mechanic demonstrations have been done on different primary, auxiliary and secondary PWR piping systems based on similar requirements that the American NUREG 1061 specifications. The consequences of the success in different demonstrations are still in discussion to be included in the global safety assessment of the plants, such as the consequences on in-service inspections, leak detection systems, support optimization,.... A large research and development program, realized in different co-operative agreements, completes the general approach.

  2. Evaluation of steam generator U-tube integrity during PWR station blackout with secondary system depressurization

    International Nuclear Information System (INIS)

    Hidaka, Akihide; Asaka, Hideaki; Sugimoto, Jun; Ueno, Shingo; Yoshino, Takehito

    1999-12-01

    In PWR severe accidents such as station blackout, the integrity of steam generator U-tube would be threatened early at the transient among the pipes of primary system. This is due to the hot leg countercurrent natural circulation (CCNC) flow which delivers the decay heat of the core to the structures of primary system if the core temperature increases after the secondary system depressurization. From a view point of accident mitigation, this steam generator tube rupture (SGTR) is not preferable because it results in the direct release of primary coolant including fission products (FP) to the environment. Recent SCDAP/RELAP5 analyses by USNRC showed that the creep failure of pressurizer surge line which results in release of the coolant into containment would occur earlier than SGTR during the secondary system depressurization. However, the analyses did not consider the decay heat from deposited FP on the steam generator U-tube surface. In order to investigate the effect of decay heat on the steam generator U-tube integrity, the hot leg CCNC flow model used in the USNRC's calculation was, at first, validated through the analysis for JAERI's LSTF experiment. The CCNC model reproduced well the thermohydraulics observed in the LSTF experiment and thus the model is mostly reliable. An analytical study was then performed with SCDAP/RELAP5 for TMLB' sequence of Surry plant with and without secondary system depressurization. The decay heat from deposited FP was calculated by JAERI's FP aerosol behavior analysis code, ART. The ART analysis showed that relatively large amount of FPs may deposit on steam generator U-tube inlet mainly by thermophoresis. The SCDAP/RELAP5 analyses considering the FP decay heat predicted small safety margin for steam generator U-tube integrity during secondary system depressurization. Considering associated uncertainties in the analyses, the potential for SGTR cannot be ignored. Accordingly, this should be considered in the evaluation of merits

  3. Quantitative analysis technique for Xenon in PWR spent fuel by using WDS

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, H. M.; Kim, D. S.; Seo, H. S.; Ju, J. S.; Jang, J. N.; Yang, Y. S.; Park, S. D. [KAERI, Daejeon (Korea, Republic of)

    2012-01-15

    This study includes three processes. First, a peak centering of the X-ray line was performed after a diffraction for Xenon La1 line was installed. Xe La1 peak was identified by a PWR spent fuel sample. Second, standard intensities of Xe was obtained by interpolation of the La1 intensities from a series of elements on each side of xenon. And then Xe intensities across the radial direction of a PWR spent fuel sample were measured by WDS-SEM. Third, the electron and X-ray depth distributions for a quantitative electron probe micro analysis were simulated by the CASINO Monte Carlo program to do matrix correction of a PWR spent fuel sample. Finally, the method and the procedure for local quantitative analysis of Xenon was developed in this study.

  4. Quantitative analysis technique for Xenon in PWR spent fuel by using WDS

    International Nuclear Information System (INIS)

    Kwon, H. M.; Kim, D. S.; Seo, H. S.; Ju, J. S.; Jang, J. N.; Yang, Y. S.; Park, S. D.

    2012-01-01

    This study includes three processes. First, a peak centering of the X-ray line was performed after a diffraction for Xenon La1 line was installed. Xe La1 peak was identified by a PWR spent fuel sample. Second, standard intensities of Xe was obtained by interpolation of the La1 intensities from a series of elements on each side of xenon. And then Xe intensities across the radial direction of a PWR spent fuel sample were measured by WDS-SEM. Third, the electron and X-ray depth distributions for a quantitative electron probe micro analysis were simulated by the CASINO Monte Carlo program to do matrix correction of a PWR spent fuel sample. Finally, the method and the procedure for local quantitative analysis of Xenon was developed in this study

  5. Full Scope Modeling and Analysis on the Secondary Circuit of Chinese Large-Capacity Advanced PWR Based on RELAP5 Code

    Directory of Open Access Journals (Sweden)

    Dao-gang Lu

    2015-01-01

    Full Text Available Chinese large-capacity advanced PWR under construction in China is a new and indispensable reactor type in the developing process of NPP fields. At the same time of NPP construction, accident sequences prediction and operators training are in progress. Since there are some possible events such as feedwater pumps trip in secondary circuit may lead to severe accident in NPP, training simulators and engineering simulators of CI are necessary. And, with an increasing proportion of nuclear power in China, NPP will participate in regulating peak load in power network, which requires accuracy calculation and control of secondary circuit. In order to achieve real-time and full scope simulation in the power change transient and accident scenarios, RELAP5/MOD 3.4 code has been adopted to model the secondary circuit for its advantage of high calculation accuracy. This paper describes the model of steady state and turbine load transient from 100% to 40% of secondary circuit using RELAP5 and provides a reasonable equivalent method to solve the calculation divergence problem caused by dramatic two-phase condition change while guaranteeing the heat transfer efficiency. The validation of the parameters shows that all the errors between the calculation values and design values are reasonable and acceptable.

  6. Proceedings: 1991 EPRI workshop on secondary-side intergranular corrosion mechanisms

    International Nuclear Information System (INIS)

    Partridge, M.J.; Zemitis, W.S.

    1992-08-01

    A workshop on ''Secondary-Side Intergranular Corrosion Mechanisms'' was organized by EPRI as an effort to give those working in this area an opportunity to share their results, ideas, and plans. Topics covered included: (1) caustic induced intergranular attack/stress corrosion cracking (IGA/IGSCC), (2) plant experience, (3) boric acid as an IGA/IGSCC remedial measure, (4) lead induced IGA/IGSCC, and (5) acid induced IGA/IGSCC

  7. Steam generators in PWR's

    International Nuclear Information System (INIS)

    Michel, R.

    1974-01-01

    The steam generator of the PWR operates according to the principle of natural circulation. It consists of a U-shaped tube bundle whose free ends are welded to a bottom plate. The tube bundle is surrounded by a cylinder jacket which has slots closely above the bottom or tube plate. The feed water mixed with boiling water enters the tube bundle through these slots. Because of its buoyancy, the steam-water mixture flows upwards. Below the tube plate there are chambers for distributing and collecting pressurized water separated by means of a partition wall. By omitting some tubes, a free alloy is created so that the tubes in the center get sufficient water, too. By asymmetrical arrangement of the partition wall it is further possible to limit the tube alloy only to the inlet side for pressurized water. The flow over the tube plate is thus improved on the inlet side. (DG) [de

  8. Advanced technologies on steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Sakata, Kaoru; Nakamura, Yuuki [Mitsubishi Heavy Industry Co., Takasago (Japan); Nakamori, Nobuo; Mizutani, Toshiyuki; Uwagawa, Seiichi; Saito, Itaru [Mitsubishi Heavy Industry Co., Kobe (Japan); Matsuoka, Tsuyoshi [Mitsubishi Heavy Industry Co., Yokohama (Japan)

    1997-12-31

    The thermal-hydraulic tests for a horizontal steam generator of a next-generation PWR (New PWR-21) were performed. The purpose of these tests is to understand the thermal-hydraulic behavior in the secondary side of horizontal steam generator during the plant normal operation. A test was carried out with cross section slice model simulated the straight tube region. In this paper, the results of the test is reported, and the effect of the horizontal steam generator internals on the thermalhydraulic behavior of the secondary side and the circulation characteristics of the secondary side are discussed. (orig.). 3 refs.

  9. Advanced technologies on steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Sakata, Kaoru; Nakamura, Yuuki [Mitsubishi Heavy Industry Co., Takasago (Japan); Nakamori, Nobuo; Mizutani, Toshiyuki; Uwagawa, Seiichi; Saito, Itaru [Mitsubishi Heavy Industry Co., Kobe (Japan); Matsuoka, Tsuyoshi [Mitsubishi Heavy Industry Co., Yokohama (Japan)

    1998-12-31

    The thermal-hydraulic tests for a horizontal steam generator of a next-generation PWR (New PWR-21) were performed. The purpose of these tests is to understand the thermal-hydraulic behavior in the secondary side of horizontal steam generator during the plant normal operation. A test was carried out with cross section slice model simulated the straight tube region. In this paper, the results of the test is reported, and the effect of the horizontal steam generator internals on the thermalhydraulic behavior of the secondary side and the circulation characteristics of the secondary side are discussed. (orig.). 3 refs.

  10. Experience and optimisation of ethanolamine treatment for a PWR secondary system

    International Nuclear Information System (INIS)

    Eeden, Nestor-van; Matthee, Felix; Montshiwagae, Maleke

    2012-09-01

    The secondary systems of both pressurised water reactor (PWR) units at Koeberg Nuclear Power Station (KNPS) on the West Coast of South Africa have been on ethanolamine (ETA) treatment since 1999 / 2000. Prior to conversion to ETA Chemistry the secondary regime was ammonia / hydrazine all volatile treatment (AVT) which aimed to achieve a pH 25C of 9.65 in the feedwater. ETA was selected as the preferred corrosion mitigation agent as opposed to the alternative secondary treatment technology available at the time to combat flow accelerated corrosion (FAC). The main advantage of ETA over ammonia is that ETA has a lower relative volatility and thus it favours the water phase while ammonia favours the steam phase. Plant chemistry, design and financial aspects were considered in the decision making for KNPS. Implementation of ETA at KNPS initially targeted 2 mg ETA/kg in the feedwater and 4 mg ETA/kg in the heater drains tank. It was found that under these conditions it was necessary to simultaneously inject ammonia to reach the pH specification in the feedwater. While using only pH as a limiting parameter, with ETA on manual control and ammonia on automated control, it was possible for the ETA concentration to drop below the target levels. To prevent this from occurring, during 2002 higher target concentrations for ETA were established of between 3.0 and 3.5 mg ETA/kg in the feedwater and with an upper limit value of 4 mg ETA/kg. In 2003, this upper limiting value and the target concentrations were discarded when it was decided to attain the pH specification without injecting ammonia. When dosing only ETA and hydrazine (in the absence of ammonia dosing) the pH specification was only achievable at greater than 4 mg ETA/kg. This specification was again revised in 2007 and changed to 4 mg ETA/kg as a minimum limit; with no upper limit value. Dosing was still manually controlled but now using feedwater conductivity measurement based on a correlation established with ETA

  11. Steam Generator Group Project: Task 10, Secondary side examination

    International Nuclear Information System (INIS)

    Schwenk, E.B.

    1987-06-01

    This report concludes an effort to examine and assess from the secondary side, the condition of the retired-from-service Surry 2A steam generator. It is includes photographs of degradation of various components or regions in a generic recirculating type steam generator. The photographic detail given in the text (and the previous report NUREG/CR-3843, PNL-5033) have not been readily available to many investigators outside the Nuclear Steam Supply Vendors and Users. The photographs include views of Inconel 600 heat exchanger tubes (0.875 diameter [nominal] x 0.050 inch wall) showing deformed and intergranularly stress-corrosion cracked U-bends, tube denting in the support plate, intergranular attack and thinning (both in the tube sheet region), support plat deformation and cracking at flow slots and in ligaments between flow holes and tube holes. In addition, photographs of tube pitting, anti-vibration bar fretting, and the sludge pile are presented. An experimental stress analysis was conducted on a distorted Row 1 tube in the region of a compressed flow slot between the 6th and 7th (top) support plates. During removal of the tube, relaxation strains were measured and residual stresses calculated. Finally a cursory metallurgical failure analysis was conducted on a broken U-bend (R1C91) to determine its mode of failure. A rotabroach boring technique was used to make multiple penetrations with minimal damage to the secondary side, at various locations on the shell

  12. PWR: 10 years after and perspectives

    International Nuclear Information System (INIS)

    1990-01-01

    These proceedings of the SFEN days on PWR (Ten years after and perspectives) comprise 13 conferences bearing on: - From the occurential approach to the state approach - Evolution of calculating tools - Human factors and safety - Reactor safety in the PWR 2000 - The PWR and the electrical power grid load follow - Fuel aspect of PWR management - PWR chemistry evolution - Balance of radiation protection - PWR modifications balance and influence on reactor operation - Design and maintenance of reactor components: 4 conferences [fr

  13. Comprehensive exergetic and economic comparison of PWR and hybrid fossil fuel-PWR power plants

    International Nuclear Information System (INIS)

    Sayyaadi, Hoseyn; Sabzaligol, Tooraj

    2010-01-01

    A typical 1000 MW Pressurized Water Reactor (PWR) nuclear power plant and two similar hybrid 1000 MW PWR plants operate with natural gas and coal fired fossil fuel superheater-economizers (Hybrid PWR-Fossil fuel plants) are compared exergetically and economically. Comparison is performed based on energetic and economic features of three systems. In order to compare system at their optimum operating point, three workable base case systems including the conventional PWR, and gas and coal fired hybrid PWR-Fossil fuel power plants considered and optimized in exergetic and exergoeconomic optimization scenarios, separately. The thermodynamic modeling of three systems is performed based on energy and exergy analyses, while an economic model is developed according to the exergoeconomic analysis and Total Revenue Requirement (TRR) method. The objective functions based on exergetic and exergoeconomic analyses are developed. The exergetic and exergoeconomic optimizations are performed using the Genetic Algorithm (GA). Energetic and economic features of exergetic and exergoeconomic optimized conventional PWR and gas and coal fired Hybrid PWR-Fossil fuel power plants are compared and discussed comprehensively.

  14. Application on electrochemistry measurement of high temperature high pressure condition in PWR nuclear power plants

    International Nuclear Information System (INIS)

    Li Yuchun; Xiao Zhongliang; Jiang Ya; Yu Xiaowei; Pang Feifei; Deng Fenfang; Gao Fan; Zhou Nianguang

    2011-01-01

    High temperature high pressure electrochemistry testing system was comprehensively analyzed in this paper, according to actual status for supervision in primary and secondary circuits of PWR nuclear power plants. Three research methods were reviewed and discussed for in-situ monitor system. By combination with ECP realtime measurement it was executed for evaluation and water chemistry optimization in nuclear power plants. It is pointed out that in-situ electrochemistry measurement has great potential application for water chemistry evaluation in PWR nuclear power plants. (authors)

  15. Numerical analysis of gas-liquid two-phase flow in secondary side of steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Murase, Michio; Nakamura, Akira; Yagi, Yoshinori [Inst. of Nuclear Safety System Inc., Mihama, Fukui (Japan)

    2002-09-01

    The steam generator (SG) in a pressurized water reactor (PWR) is an important two-phase flow component as the boundary between the primary loop and the secondary loop. In this study, we performed gas-liquid two-phase flow analyses for SG reliability tests conduced by Nuclear Power Engineering Corporation (NUPEC) using the two-fluid model of a thermal-hydraulic computer code PHOENICS. In order to calculate the location of the boiling initiation accurately, detailed inputs were required for the friction coefficients affecting the velocity distribution and the heat transfer distribution. However, the velocity and heat transfer distributions did not greatly affect the void fractions in the upper region of the heat transfer tubes. The calculated void fractions agreed with the measured values within 4% as the local average and within 2% as an average in a cross-section, except the region of low void fractions. (author)

  16. Maturity of the PWR

    International Nuclear Information System (INIS)

    Bacher, P.; Rapin, M.; Aboudarham, L.; Bitsch, D.

    1983-03-01

    Figures illustrating the predominant position of the PWR system are presented. The question is whether on the basis of these figures the PWR can be considered to have reached maturity. The following analysis, based on the French program experience, is an attempt to pinpoint those areas in which industrial maturity of the PWR has been attained, and in which areas a certain evolution can still be expected to take place

  17. The verification of PWR-fuel code for PWR in-core fuel management

    International Nuclear Information System (INIS)

    Surian Pinem; Tagor M Sembiring; Tukiran

    2015-01-01

    In-core fuel management for PWR is not easy because of the number of fuel assemblies in the core as much as 192 assemblies so many possibilities for placement of the fuel in the core. Configuration of fuel assemblies in the core must be precise and accurate so that the reactor operates safely and economically. It is necessary for verification of PWR-FUEL code that will be used in-core fuel management for PWR. PWR-FUEL code based on neutron transport theory and solved with the approach of multi-dimensional nodal diffusion method many groups and diffusion finite difference method (FDM). The goal is to check whether the program works fine, especially for the design and in-core fuel management for PWR. Verification is done with equilibrium core search model at three conditions that boron free, 1000 ppm boron concentration and critical boron concentration. The result of the average burn up fuel assemblies distribution and power distribution at BOC and EOC showed a consistent trend where the fuel with high power at BOC will produce a high burn up in the EOC. On the core without boron is obtained a high multiplication factor because absence of boron in the core and the effect of fission products on the core around 3.8 %. Reactivity effect at 1000 ppm boron solution of BOC and EOC is 6.44 % and 1.703 % respectively. Distribution neutron flux and power density using NODAL and FDM methods have the same result. The results show that the verification PWR-FUEL code work properly, especially for core design and in-core fuel management for PWR. (author)

  18. The PWR cores management

    International Nuclear Information System (INIS)

    Barral, J.C.; Rippert, D.; Johner, J.

    2000-01-01

    During the meeting of the 25 january 2000, organized by the SFEN, scientists and plant operators in the domain of the PWR debated on the PWR cores management. The five first papers propose general and economic information on the PWR and also the fast neutron reactors chains in the electric power market: statistics on the electric power industry, nuclear plant unit management, the ITER project and the future of the thermonuclear fusion, the treasurer's and chairman's reports. A second part offers more technical papers concerning the PWR cores management: performance and optimization, in service load planning, the cores management in the other countries, impacts on the research and development programs. (A.L.B.)

  19. Steam generators secondary side chemical cleaning at Point Lepreau using the Siemen's high temperature process

    International Nuclear Information System (INIS)

    Verma, K.; MacNeil, C.; Odar, S.

    1996-01-01

    The secondary sides of all four steam generators at the Point Lepreau Nuclear Generating Stations were cleaned during the 1995 annual outage run-down using the Siemens high temperature chemical cleaning process. Traditionally all secondary side chemical cleaning exercises in CANDU as well as the other nuclear power stations in North America have been conducted using a process developed in conjunction with the Electric Power Research Institute (EPRI). The Siemens high temperature process was applied for the first time in North America at the Point Lepreau Nuclear Generating Station (PLGS). The paper discusses experiences related to the pre and post award chemical cleaning activities, chemical cleaning application, post cleaning inspection results and waste handling activities. (author)

  20. Evaluation of SG blowdown demineralizer performance by replacement of ammonia with ethanolamine as a PWR secondary pH control agent

    Energy Technology Data Exchange (ETDEWEB)

    Rhee, I.H. [Department of Materials and Chemical Engineering, Soonchunhyang Univ. (Korea, Republic of); Yim, S.J. [Operation Management Team, Korea Hydro and Nuclear Power Co. Ltd., Seoul (Korea, Republic of)

    2002-07-01

    Four Korean PWR plants have adopted ethanolamine (ETA) as a secondary pH control agent to increase the pH at the liquid phase, which raises the pH in the SG blowdown system. The run time of the SG blowdown demineralizer can be reduced by the increased number of ionic chemical species primarily due to ETA. Contrary to the possible prevention of SG degradation, the replacement of ammonia with ETA results in the water chemistry difficulties and more frequent generation of spent resin. A comprehensive experimental data set for binary, ternary, quaternary, and quinary cation and anion adsorption was developed from small-volume batch tests at total cation or anion concentrations of 0.01 and 0.05 N to obtain the selectivity coefficients of many cations and anions normally present in the PWR secondary system water. In addition, the kinetic study using the bench-scale column was performed to examine the breakthrough point of an ion and to calculate the ratio of inlet to outlet concentration at the column, so called Decontamination Factor, in the different background electrolyte. The batch equilibrium tests indicated that the ion selectivity is higher for an ion of higher valence and is not uniform in the different composition and ionic strength. The preference of an ion on ion exchange resin rather tends to be lower with higher ionic strength. The leakage of an ion from the ion exchange column is not also uniform in time in the various composition and total concentration. Therefore the ion selectivity and breakthrough time are different in ammonia and ethanolamine background electrolytes. The run time of SG blowdown demineralizer can be shorter than it can be expected due to the elevated ionic strength as well as the increased dissolved solids. The quantitative run time can be estimated by such ion exchange models as semi-empirical mass action and surface complexation models. The demineralizer can be used longer by increasing the ratios of cation to anion exchange resins in

  1. Evaluation of SG blowdown demineralizer performance by replacement of ammonia with ethanolamine as a PWR secondary pH control agent

    International Nuclear Information System (INIS)

    Rhee, I.H.; Yim, S.J.

    2002-01-01

    Four Korean PWR plants have adopted ethanolamine (ETA) as a secondary pH control agent to increase the pH at the liquid phase, which raises the pH in the SG blowdown system. The run time of the SG blowdown demineralizer can be reduced by the increased number of ionic chemical species primarily due to ETA. Contrary to the possible prevention of SG degradation, the replacement of ammonia with ETA results in the water chemistry difficulties and more frequent generation of spent resin. A comprehensive experimental data set for binary, ternary, quaternary, and quinary cation and anion adsorption was developed from small-volume batch tests at total cation or anion concentrations of 0.01 and 0.05 N to obtain the selectivity coefficients of many cations and anions normally present in the PWR secondary system water. In addition, the kinetic study using the bench-scale column was performed to examine the breakthrough point of an ion and to calculate the ratio of inlet to outlet concentration at the column, so called Decontamination Factor, in the different background electrolyte. The batch equilibrium tests indicated that the ion selectivity is higher for an ion of higher valence and is not uniform in the different composition and ionic strength. The preference of an ion on ion exchange resin rather tends to be lower with higher ionic strength. The leakage of an ion from the ion exchange column is not also uniform in time in the various composition and total concentration. Therefore the ion selectivity and breakthrough time are different in ammonia and ethanolamine background electrolytes. The run time of SG blowdown demineralizer can be shorter than it can be expected due to the elevated ionic strength as well as the increased dissolved solids. The quantitative run time can be estimated by such ion exchange models as semi-empirical mass action and surface complexation models. The demineralizer can be used longer by increasing the ratios of cation to anion exchange resins in

  2. Life extension, power upgrade, and return to service work for Pickering NGS and other PWR and CANDU plants

    International Nuclear Information System (INIS)

    Millman, J.; Idvorian, N.; Schneider, W.

    2002-01-01

    Work on life extension, power upgrade and return to service has been performed and is in progress for a number of PWR and CANDU plants. For PWR plants, power upgrade work has been done for the new replacement steam generators in several cases. This work consists of redoing the formal equipment qualification analysis and reports for the uprated operating conditions to support the application for license adjustment. Life extension assessments have been performed for several CANDU plants. These are highly detailed assessments in which the particular steam generator is reassessed part by part as to the ability of each to sustain full life operation and also extended life operation. Return to service work for Pickering NGSA specifically has included this type of assessment and also specific repair, cleaning and retrofit activities including secondary side inspection, waterlancing, divider plate repair, eddy current inspection, etc. Steam generator modifications and retrofit work have been performed in a number of cases. The paper discusses various life extension, power upgrade, equipment modification and return to service activities all of which are part of the renewed drive in the industry to realise the full potential of nuclear plants by getting more and better performance from the extended service of existing plants. (author)

  3. VAMCIS, a new measuring channel for continuous monitoring of leak rates inside PWR steam generators

    International Nuclear Information System (INIS)

    Champion, G.; Dubail, A.; Lefevre, F.

    1988-01-01

    In order to assess the primary to secondary leakage, radioactive isotopes, formed in the primary coolant as a result of fission or neutron capture, are usually monitored in the pressurized water reactor (PWR) secondary coolant. Conventional methods mainly based on the detection of 133 Xe, tritium, and 41 Ar are widely used on French Electricite de France (EdF) PWRs. Some years ago, it appeared necessary to improve both leak rate assessments and steam generator tube rupture (SGTR) detection. A volumetric activity measuring channel inside steam (VAMCIS) has been developed for this purpose. The SGTR that occurred at the North Anna PWR has focused the attention of safety authorities on this new measuring channel. It is planned to implement VAMCIS at North Anna in order to check the leak rate variations more accurately

  4. Oxygen control in PWR secondary coolant: Final report

    International Nuclear Information System (INIS)

    Oliker, I.; Shaikh, B.

    1988-12-01

    The objective of the study is to assess the technical aspects of utilizing direct contact heaters in the condensate train and a bubbling deaerating device in the condenser in order to improve the deaeration in the feedwater system, and develop cost estimates for such a plant retrofit. A reference PWR plant has been used to establish a basis for development of retrofit requirements and system costs. Emphasis has been placed on retrofitting the existing low pressure heaters in the condenser neck into direct contact heaters in order to improve the condensate deaeration at the very beginning of the condensate-feedwater cycle. Two basic designs of direct contact heater are discussed and their technical benefits are described. Required plant modifications have been developed and improvement in heat rates have been evaluated. Cost estimates have been developed for such a retrofit. Turbine protection against water induction has been addressed at length including recommendations on various protection measures. Incorporation of a bubbling deaerating device into the reference plant has been evaluated, and its cost estimate has been developed. 4 refs., 18 figs., 1 tab

  5. PWR water chemistry controls: a perspective on industry initiatives and trends relative to operating experience and the EPRI PWR water chemistry guidelines

    International Nuclear Information System (INIS)

    Fruzzetti, K.; Choi, S.; Haas, C.; Pender, M.; Perkins, D.

    2010-01-01

    An effective PWR water chemistry control program must address the following goals: Minimize materials degradation (e.g., PWSCC, corrosion of fuel, corrosion damage of steam generator (SG) tubes); Maintain fuel integrity and good performance; Minimize corrosion product transport (e.g., transport and deposition on the fuel, transport into the SGs where it can foul tube surfaces and create crevice environments for the concentration of corrosive impurities); Minimize dose rates. Water chemistry control must be optimized to provide overall improvement considering the sometimes variant constraints of the goals listed above. New technologies are developed for continued mitigation of materials degradation, continued fuel integrity and good performance, continued reduction of corrosion product transport, and continued minimization of plant dose rates. The EPRI chemistry program, in coordination with other EPRI programs, strives to improve these areas through application of chemistry initiatives, focusing on these goals. This paper highlights the major initiatives and issues with respect to PWR primary and secondary system chemistry and outlines the recent, on-going, and proposed work to effectively address them. These initiatives are presented in light of recent operating experience, as derived from EPRI's PWR chemistry monitoring and assessment program, and EPRI's water chemistry guidelines. (author)

  6. Development of a diagnostic expert system for secondary water chemistry

    International Nuclear Information System (INIS)

    Suganuma, S.; Ishikawa, S.; Kato, A.; Yamauchi, S.; Hattori, T.; Yoshikawa, T.; Miyamoto, S.

    1990-01-01

    Water chemistry control for the secondary side of the PWR plants is one of the most important tasks for maintaining the reliability of plant equipment and for extending the operating life of the plant. Water chemistry control should be maintained according to the plant chemist' considered judgement which is based on continual experienced observation. Mitsubishi Heavy Industries (MHI) has been developing a comprehensive data management and diagnosis system, which continuously observes the secondary water chemistry data with on-line monitors, immediately diagnosing causes whenever any symptoms of abnormality are detected and does the necessary data management, in order to support plant staff to controll water chemistry. This system has the following three basic functions: data management, diagnosis and simulation. This paper presents the outline of the total system, and then describes in detail the procedure of diagnosis, the structure of the knowledge and its validation process

  7. Current experience and a new modeling on water hammer due to steam condensation in PWR secondary system

    International Nuclear Information System (INIS)

    Kawanishi, K.; Kasahara, J.; Ueno, T.; Suzuta, T.

    1998-01-01

    There have been possibilities to occur water hammer in pipelines of turbine system for nuclear or fossil fuel power plants. According to the NUREG report, approximately 150 events have been reported since 1969, we also have an experience recently. Water hammer occurs due to sudden steam condensation with pressure pulse. This kind of pressure pulses has been made by alternative producing and condensing of steam slug in the pipe and its frequency relates subcooling and pipe structures. This paper presents our current experience on water hammer with some experimental studies. The present experiment has been performed to obtain the data base for evaluating the pressure pulses. The test pipe was horizontal tubes with dead end connected to vertical tube which simulating drain line in PWR secondary system. The main results are shown as follows; Magnitude of pressure pulse depends drain velocity and initial subcooling. Pipe structure effects on the frequency and continual time of water hammer phenomenon. A new modeling for quantitative explanation of the phenomena is also presented

  8. Water chemistry control of PWR nuclear power plant

    International Nuclear Information System (INIS)

    Hino, Yuichi; Makino, Ichiro; Yamauchi, Sumio; Fukuda, Fumihito.

    1992-01-01

    In PWR power plants, the primary system taking heat out of nuclear reactors and the secondary system generating steam and driving turbines are completely separated by steam generators, accordingly, by mutually independent water treatment, both systems are to be maintained in the optimal conditions. Namely, primary system is the closed water circulation circuit of simple liquid phase though under high temperature, high pressure condition, therefore, water shows the stable physical and chemical properties, and the minute water treatment for restraining the corrosion of structural materials and reducing radioactivity can be done. Secondary system is similar to the condensate and feedwater system of thermal power plants, and is the circuit for liquid-vapor two-phase transformation, but due to the local concentration of impurities by evaporation, the strict requirement is set for secondary water quality. However, secondary system can be treated in the state without radioactivity, and this is a great merit. The outline, basic concept and execution of primary water quality control, and the outline, concept, control criteria, facilities and execution of secondary water quality control are reported. (K.I.)

  9. Preliminary study on direct recycling of spent PWR fuel in PWR system

    International Nuclear Information System (INIS)

    Waris, Abdul; Nuha; Novitriana; Kurniadi, Rizal; Su'ud, Zaki

    2012-01-01

    Preliminary study on direct recycling of PWR spent fuel to support SUPEL (Straight Utilization of sPEnt LWR fuel in LWR system) scenario has been conducted. Several spent PWR fuel compositions in loaded PWR fuel has been evaluated to obtain the criticality of reactor. The reactor can achieve it criticality for U-235 enrichment in the loaded fresh fuel is at least 4.0 a% with the minimum fraction of the spent fuel in the core is 15.0 %. The neutron spectra become harder with the escalating of U-235 enrichment in the loaded fresh fuel as well as the amount of the spent fuel in the core.

  10. Stress corrosion cracking susceptibility of steam generator tubing on secondary side in restricted flow areas

    International Nuclear Information System (INIS)

    Fulger, M.; Lucan, D.; Radulescu, M.; Velciu, L.

    2003-01-01

    Nuclear steam generator tubes operate in high temperature water and on the secondary side in restricted flow areas many nonvolatile impurities accidentally introduced into circuit tend to concentrate. The concentration process leads to the formation of highly aggressive alkaline or acid solutions in crevices, and these solutions can cause stress corrosion cracking (SCC) on stressed tube materials. Even though alloy 800 has shown to be highly resistant to general corrosion in high temperature water, it has been found that the steam generator tubes may crack during service from the primary and/or secondary side. Stress corrosion cracking is still a serious problem occurring on outside tubes in operating steam generators. The purpose of this study was to evaluate the environmental factors affecting the stress corrosion cracking of steam generators tubing. The main test method was the exposure for 1000 hours into static autoclaves of plastically stressed C-rings of Incoloy 800 in caustic solutions (10% NaOH) and acidic chloride solutions because such environments may sometimes form accidentally in crevices on secondary side of tubes. Because the kinetics of corrosion of metals is indicated by anodic polarization curves, in this study, some stressed specimens were anodically polarized in caustic solutions in electrochemical cell, and other in chloride acidic solutions. The results presented as micrographs, potentiokinetic curves, and electrochemical parameters have been compared to establish the SCC behavior of Incoloy 800 in such concentrated environments. (authors)

  11. New Technology for Corrosion Mitigation of Steam Generator Tubesheet in Secondary Side Environments

    International Nuclear Information System (INIS)

    Hur, Do Haeng; Choi, Myung Sik; Lee, Deok Hyun; Han, Jung Ho

    2013-01-01

    Denting has been mitigated by a modification of the design and material of the tube support structures, it has been an inevitable problem in the crevice region of the top of the tubesheet(TTS). Denting at the TTS has been a significant concern regardless of the tube materials. This is because it is a mechanical process resulted from a volume expansion of corrosion products of the tubesheet materials. It should be noted that the corrosion rate of low alloy tubesheet materials is accelerated due to the presence of corrosion products accumulated at the top of the tubesheet. Therefore a reduction of the corrosion rate of the tubesheet material should be a key strategy to prevent tube denting at the TTS as well as an improvement of the secondary water chemistry. This paper provides a new technology to prevent denting by cladding the secondary side surface of the tubesheet with a corrosion resistant material. In this study, Alloy 690 material on the surface of the SA508 tubesheet was cladded to a thickness of about 9mm. The corrosion rates of the SA508 original tubesheet and Alloy 690 clad material were measured in acidic and caustic simulated environments. Denting has been a precursor of stress corrosion cracking in nuclear steam generator tubing, although it may be mitigated by a design and material modification of the tube support structures and secondary water chemistry control. Corrosion resistant Alloy 690 tubing is not an exception because denting at the TTS is due to corrosion of the tubesheet material. In this paper, a new technology was suggested to prevent denting at the TTS by cladding the secondary side surface of the tubesheet with a corrosion resistant material. It was verified that the corrosion rates of a tubesheet with an Alloy 690 clad layer drastically decreased in both acidic and alkaline environments, even inside the magnetite sludge pile. Because the cladding processes of Alloy 690 have already been applied to the primary side surface of a

  12. Next generation PWR

    International Nuclear Information System (INIS)

    Tanaka, Toshihiko; Fukuda, Toshihiko; Usui, Shuji

    2001-01-01

    Development of LWR for power generation in Japan has been intended to upgrade its reliability, safety, operability, maintenance and economy as well as to increase its capacity in order, since nuclear power generation for commercial use was begun on 1970, to steadily increase its generation power. And, in Japan, ABWR (advanced BWR) of the most promising LWR in the world, was already used actually and APWR (advanced PWR) with the largest output in the world is also at a step of its actual use. And, development of the APWR in Japan was begun on 1980s, and is at a step of plan on construction of its first machine at early of this century. However, by large change of social affairs, economy of nuclear power generation is extremely required, to be positioned at an APWR improved development reactor promoted by collaboration of five PWR generation companies and the Mitsubishi Electric Co., Ltd. Therefore, on its development, investigation on effect of change in social affairs on nuclear power stations was at first carried out, to establish a design requirement for the next generation PWR. Here were described on outline, reactor core design, safety concept, and safety evaluation of APWR+ and development of an innovative PWR. (G.K.)

  13. Quantitative measurement of trace amounts of dissolved oxygen in the primary and secondary systems of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Castaneda, H.B.; Neale, T.A.

    1989-01-01

    Establishing and maintaining the correct water chemistry conditions in the primary and secondary systems of pressurized water reactor (PWR) nuclear power plants is essential in order to maximize the operating life and guarantee the uninterrupted availability of the major components of each PWR unit. The exact specifications for maintaining the correct water chemistry are well established. One of the most important parameters that must be closely monitored in a modern power generation plant is the level of dissolved oxygen (DO) present in the system. Because of the high temperatures and pressures involved, even minute traces of DO---on the order of a few parts per billion (ppb)---can be detrimental to the heat transfer surfaces in steam generators, heaters, etc. The authors argue that the method of determining trace levels of DO presented here is a modification of the original method that has greatly increased the detection level obtainable with Rhodazine-D. Measurements down to less than 1 ppb (μg/Liter), with a resolution of 0.5 ppb (μ/Liter), are now easily obtainable. No calibration procedures are required and no maintenance of critical components is needed. This quantitative method is based on the instantaneous stoichiometric reaction of Rhodazine-D with oxygen. After less than one minute the oxidation reaction is complete and the fully developed color is compared with a set of stable liquid color standards. The color standards are formulated using the oxidized form of Rhodazine-D, thus providing an exact color match for the reacted sample-reagent. Supporting data are presented that confirm the relative accuracy and sensitivity of the new method, as well as results of a comparative evaluation of the method versus in-line dissolved oxygen analyzers

  14. Steam generator secondary side chemical cleaning at Gentilly-2

    International Nuclear Information System (INIS)

    Plante, S.

    2006-01-01

    After more than 20 years of operation, the secondary side of the four steam generators at Gentilly-2 were chemically cleaned during the 2005 annual outage. The FRAMATOME ANP high temperature cleaning process used to remove magnetite loading involved stepwise injection of solvent with PHT temperature in the range 160 o C to 175 o C. The heat required to maintain the PHT temperature was provided by the operation of the main PHT pumps and the reactor core residual heat. The temperature control was accomplished by the shutdown cooling system heat exchangers. A total of 1280 kg of magnetite was removed from the four steam generators. A copper-cleaning step was applied after the iron step. The PHT has been cooled down and the steam generators drained to temporary tanks and dried in preparation of the copper step. The process has been applied at room temperature, two boilers at a time. The solvent removed a total of 116 kg of copper. During the iron step, steam flow to the feedwater tank chemically contaminate the Balance Of Plant (BOP) systems. The isolation of this path should have been part of the G2 procedures. Around 700 m3 of water had to be drained to interim storage tanks for subsequent resin treatment before disposal. Visual inspection of BO1 tubesheet and first support plate showed clean surfaces without measurable sludge pile. Upper support plates visual inspection of BO4 revealed that broach holes blockage reported in 2000 is still present in peripheral area. Following the plant restart, the medium range level measurement instability observed since several years for BO3 was no more present. As anticipated, it also has been observed that the medium and wide range level measurements have shifted down as a result of downcomer flow increase after the cleaning. The cleaning objectives were achieved regarding the fouling reduction on the steam generators secondary side but broach holes blockage of the upper support plate is still present in periphery. (author)

  15. Numerical simulation of thermohydraulic behavior of the steam generator of PWR type reactor

    International Nuclear Information System (INIS)

    Braga, C.V.M.; Carajilescov, P.

    1981-01-01

    Generally, 'U' tube steam generators with natural internal recirculation are used in PWR power stations. A thermalhydraulic model is developed for simulation of such components, in steady state. The flow of the secondary cycle fluid is divided in two parts individually homogeneous, allowing for heat and mass exchange between them. The secondary pressure is determined by defining the moisture of the vapor that feeds the turbine. This model is applied to the Angra II steam generator, operating in nominal conditions and with tubing partially plugged. (Author) [pt

  16. Development of the mitigation method for carbon steel corrosion with ceramics in PWR secondary system

    International Nuclear Information System (INIS)

    Okamura, Masato; Shibasaki, Osamu; Miyazaki, Toyoaki; Kaneko, Tetsuji

    2012-09-01

    To verify the effect of depositing ceramic (TiO 2 , La 2 O 3 , and Y 2 O 3 ) on carbon steel to mitigate corrosion, corrosion tests were conducted under simulated chemistry conditions in a PWR secondary system. Test specimens (STPT410) were prepared with and without deposited ceramics. The ceramics were deposited on the specimens under high-temperature and high-pressure water conditions. Corrosion tests were conducted under high pH conditions (9.8) with a flow rate of 1.0-4.7 m/s at 185 deg. C for 200 hours. At a flow rate of 1.0 m/s, the amount of corrosion of the specimens with the ceramics was less than half of that of the specimens without the ceramics. As the flow rate increased, the amount of corrosion increased. However, even at a flow rate of 4.7 m/s, the amount of corrosion was reduced by approximately 30% by depositing the ceramics. After the corrosion tests, the surfaces of the specimens were analyzed with SEM and XRD. When the deposited ceramic was TiO 2 , the surface was densely covered with fine particles (less than 1 μm). From XRD analysis, these particles were identified as ilmenite (FeTiO 3 ). We consider that ilmenite may play an important role in mitigating the corrosion of carbon steel. (authors)

  17. PWR-related integral safety experiments in the PKL 111 test facility SBLOCA under beyond-design-basis accident conditions

    Energy Technology Data Exchange (ETDEWEB)

    Weber, P.; Umminger, K.J.; Schoen, B. [Siemens AG Power Generation Group (KWU), Erlangen (France)

    1995-09-01

    The thermal hydraulic behavior of a PWR during beyond-design-basis accident scenarios is of vital interest for the verification and optimization of accident management procedures. Within the scope of the German reactor safety research program experiments were performed in the volumetrically scaled PKL 111 test facility by Siemens/KWU. This highly instrumented test rig simulates a KWU-design PWR (1300 MWe). In particular, the latest tests performed related to a SBLOCA with additional system failures, e.g. nitrogen entering the primary system. In the case of a SBLOCA, it is the goal of the operator to put the plant in a condition where the decay heat can be removed first using the low pressure emergency core cooling system and then the residual heat removal system. The experimental investigation presented assumed the following beyond-design-basis accident conditions: 0.5% break in a cold leg, 2 of 4 steam generators (SGs) isolated on the secondary side (feedwater- and steam line-valves closed), filled with steam on the primary side, cooldown of the primary system using the remaining two steam generators, high pressure injection system only in the two loops with intact steam generators, if possible no operator actions to reach the conditions for residual heat removal system activation. Furthermore, it was postulated that 2 of the 4 hot leg accumulators had a reduced initial water inventory (increased nitrogen inventory), allowing nitrogen to enter the primary system at a pressure of 15 bar and nearly preventing the heat transfer in the SGs ({open_quotes}passivating{close_quotes} U-tubes). Due to this the heat transfer regime in the intact steam generators changed remarkably. The primary system showed self-regulating system effects and heat transfer improved again (reflux-condenser mode in the U-tube inlet region).

  18. Correlation between protein secondary structure, backbone bond angles, and side-chain orientations

    Science.gov (United States)

    Lundgren, Martin; Niemi, Antti J.

    2012-08-01

    We investigate the fine structure of the sp3 hybridized covalent bond geometry that governs the tetrahedral architecture around the central Cα carbon of a protein backbone, and for this we develop new visualization techniques to analyze high-resolution x-ray structures in the Protein Data Bank. We observe that there is a correlation between the deformations of the ideal tetrahedral symmetry and the local secondary structure of the protein. We propose a universal coarse-grained energy function to describe the ensuing side-chain geometry in terms of the Cβ carbon orientations. The energy function can model the side-chain geometry with a subatomic precision. As an example we construct the Cα-Cβ structure of HP35 chicken villin headpiece. We obtain a configuration that deviates less than 0.4 Å in root-mean-square distance from the experimental x-ray structure.

  19. X-rays diffraction characterization of corrosion products transported by secondary side of a CANDU NPP

    International Nuclear Information System (INIS)

    Dinu, A.; Tunaru, M.; Velciu, L.

    2016-01-01

    To verify the chemistry of secondary side of CANDU steam generators, Millipore filters are used to sampling from condensing extraction pump, from feed water header and blow down of steam generator. These filters retain the corrosion products as very fine particles and are used as samples in chemistry water control. X-Ray diffraction technique is the able to distinguish the different crystallographic compounds present in oxide films deposited on the Millipore filters and gives information referring to the nature of corrosion products transported in secondary side. The XRD analysis has identified the following substance in deposited layer: magnetite (Fe_3O_4), hematite (Fe_2O_3), and iron oxide hydroxide (FeOOH). By optical microscopy it was observed a brown-reddish background specific to hematite and iron oxide hydroxide, especially for filters extracted from condensing extraction pump. The black colour of crud present on filters extracted from feed water header and blow down of steam generator shows the presence of magnetite. (authors)

  20. Measurement of gas-liquid two-phase flow around horizontal tube bundle using SF6-water. Simulating high-pressure high-temperature gas-liquid two-phase flow of PWR/SG secondary coolant side at normal pressure

    International Nuclear Information System (INIS)

    Ishikawa, Atsushi; Imai, Ryoj; Tanaka, Takahiro

    2014-01-01

    In order to improve prediction accuracy of analysis code used for design and development of industrial products, technology had been developed to create and evaluate constitutive equation incorporated in analysis code. The experimental facility for PWR/SG U tubes part was manufactured to measure local void fraction and gas-liquid interfacial velocity with forming gas-liquid upward two-phase flow simulating high-pressure high-temperature secondary coolant (water-steam) rising vertically around horizontal tube bundle. The experimental facility could reproduce flow field having gas-liquid density ratio equivalent to real system with no heating using SF6 (Sulfur Hexafluoride) gas at normal temperature and pressure less than 1 MPa, because gas-liquid density ratio, surface tension and gas-liquid viscosity ratio were important parameters to determine state of gas-liquid two-phase flow and gas-liquid density ratio was most influential. Void fraction was measured by two different methods of bi-optical probe and conductivity type probe. Test results of gas-liquid interfacial velocity vs. apparent velocity were in good agreement with existing empirical equation within 10% error, which could confirm integrity of experimental facility and appropriateness of measuring method so as to set up original constitutive equation in the future. (T. Tanaka)

  1. AGR v PWR

    International Nuclear Information System (INIS)

    Green, D.

    1986-01-01

    When the Central Electricity Generating Board (CEGB) invited tenders and placed a contract for the Advanced Gas Cooled Reactor (AGR) at Dungeness B in 1965 -preferring it to the Pressurised Water Reactor (PWR) -the AGR was lamentably ill developed. The effects of the decision were widely felt, for it took the British nuclear industry off the light water reactor highway of world reactor business and up and idiosyncratic private highway of its own, excluding it altogether from any material export business in the two decades which followed. Yet although the UK may have made wrong decisions in rejecting the PWR in 1965, that does not mean that it can necessarily now either correct them, or redeem their consequence, by reversing the choice in 1985. In the 20 years since 1965 the whole world economic and energy picture has been transformed and the national picture with it. Picking up the PWR now could prove as big a disaster as rejecting it may have been in 1965. (author)

  2. Water Quality of NPP Secondary Side with Combined Water Chemistry of Ammonia and Ethanolamine

    International Nuclear Information System (INIS)

    Rhee, In-H.; Jung, Hyun-jun; Cho, Daechul; Park, Byunggi

    2012-09-01

    Ammonia (AM) and Ethanolamine (ETA), as pH control additive agents, were injected to the secondary side in a Korean NPP for the even pH in the entire secondary system including the wet region and the condensate. Ammonia and ETA are dominant in the vapor and liquid phases, respectively, since the former and latter are more and less volatile than water in the temperature range of 30 to 300 . pH of 9.5 to 9.7 was maintained in the water-steam cycle at the concentrations of ammonia with ∼1.0 ppm and ETA of ∼1.8 ppm. From the standpoint of corrosion, i.g, concentration of Fe, the water quality of secondary side was improved by the combined water treatment of ammonia and ETA, compared to all volatile treatment of ammonia. The electrical conductivity was increased from 6 to 10 μS/cm due to the presence of organic carboxylates produced by the decomposition of ETA. ETA was broken down by <5% in steam generator and converted into formate, acetate, and glycolate, among which acetate was largely formed. But inorganic ions such as Na + , Cl - , and SO 4 2- are not changed because their ingress was not made and the selectivity of resin over those ions was not fairly altered. The runtime of demineralizer in steam generator blowdown was shortened by a third for a mixture of ammonia and ETA. Most of Fe was originated from the shell side of heat exchangers including the condenser as a result of corrosion. Fe was only eliminated by ion exchange demineralizers, i.e., 46% at CPP and 3% at SG BD and 70% of Fe oxides were accumulated at the steam generator, on the basis of Fe concentration at the final feedwater. In conclusion, ETA is preferable to ammonia for the enhancement of pH in the liquid phase of water-steam mixture such as the shell side of heat exchanger and also the full-flow operation of CPP is more desirable than partial-flow operation for the improved removal of corrosion products, regardless of hydrogen- or amine-type operation. (authors)

  3. ERP-IV-A program for transient thermal-hydraulic analysis of PWR plant

    International Nuclear Information System (INIS)

    Dai Anguo; Tang Jiahuan; Qian Huifu; Gao Zhikang

    1987-12-01

    The author deal with the descriptions of physical model of transient process in PWR plant and the function of ERP-IV (ERR-IV Transient Thermo-Hydraulic Analysis Code). The code has been developed for safety analysis and design transient. The code is characterized by the multi-loop long-term, short term, wide-range plant simulation with the capability to analyze natural circulation condition. The description of ERP-IV includes following parts: reactor, primary coolant loops, pressurizer, steam generators, main steam system, turbine, feedwater system, steam dump, relive valves, and safety valves in secondary side, etc.. The code can use for accident analysis, such as loss of all A.C. power to power plant auxiliaries (a station blackout), loss of normal feedwater, loss of load, loss of condenser vacuum and other events causing a turbine trip, complete loss of forced reactor coolant flow, uncontrolled rod cluster control assembly bank withdrawal. It can also be used for accident analysis of the emergency and limiting conditions, such as feedwater line break and main steam line rupture. It can also be utilized as a tool for system design studies, component design, setpoint studies and design transition studies, etc

  4. Lightweight submersed 'Walking' NDE manipulators for PWR and BWR vessel weld inspection

    International Nuclear Information System (INIS)

    Saernmark, Ivan; Lenz, Herbert

    2008-01-01

    Three new manipulators developed by WesDyne TRC in Sweden have under the year 2007 performed three very successful inspections in the PWR reactor Ringhals 3 and the BWR reactors Ringhals 1 and Oskarshamn 1. The manipulator systems can be used to perform inspection of circumferential and vertical welds on the reactor pressure vessel, the core shroud, core shroud support in BWR reactors or vessel and core barrel welds in PWR reactors. Most other flat or curved surfaces can be inspected using the new concept through relatively simple mechanical reconfigurations of system modules. The first inspection was performed on the R3 PWR core barrel in June 2007 with a very good result. This Manipulator is designed for access in very narrow gaps and for the type of core barrels with a shield covering the whole area of the perimeter. The manipulator is attached to the inspection area by means of a new unique suction cup system. The current manipulators consist of a curved horizontal beam, with radius similar to the reactor vessel, and a straight vertical beam, forming a T-shaped structure. By alternating the application of suction cup pairs on the horizontal beam and the vertical beam and by driving the scanning motors, the manipulator performs an incremental translational movement upwards/downwards or from side to side. The principles of this system give a well defined and stable platform for global and local positioning accuracy. A combination of advanced sensor solutions provides accurate position information in the absence of other physical reference objects. The system is controlled by the new WesDyne TRC Motor Control Panel and software, the MCP is specifically designed for remote control of submersed manipulators using techniques for cable reduction

  5. Secondary Pulmonary Hypertension and Right-Sided Heart Failure at Presentation in Grave's Disease

    OpenAIRE

    Ganeshpure, Swapnil Panjabrao; Vaidya, Gaurang Nandkishor; Gattani, Vipul

    2012-01-01

    A young female presented with evidence of right-sided heart failure and was subsequently found to have significant pulmonary artery hypertension (PAH). Because of her normal left ventricular function and pulmonary capillary wedge pressure, the most probable site of etiology seemed to be the pulmonary vasculature. All the common possible secondary causes of PAH were ruled out, but during the investigations, she was found to have elevated thyroid function tests compatible with the diagnosis of...

  6. Minor actinide transmutation on PWR burnable poison rods

    International Nuclear Information System (INIS)

    Hu, Wenchao; Liu, Bin; Ouyang, Xiaoping; Tu, Jing; Liu, Fang; Huang, Liming; Fu, Juan; Meng, Haiyan

    2015-01-01

    Highlights: • Key issues associated with MA transmutation are the appropriate loading pattern. • Commercial PWRs are the only choice to transmute MAs in large scale currently. • Considerable amount of MA can be loaded to PWR without disturbing k eff markedly. • Loading MA to PWR burnable poison rods for transmutation is an optimal loading pattern. - Abstract: Minor actinides are the primary contributors to long term radiotoxicity in spent fuel. The majority of commercial reactors in operation in the world are PWRs, so to study the minor actinide transmutation characteristics in the PWRs and ultimately realize the successful minor actinide transmutation in PWRs are crucial problem in the area of the nuclear waste disposal. The key issues associated with the minor actinide transmutation are the appropriate loading patterns when introducing minor actinides to the PWR core. We study two different minor actinide transmutation materials loading patterns on the PWR burnable poison rods, one is to coat a thin layer of minor actinide in the water gap between the zircaloy cladding and the stainless steel which is filled with water, another one is that minor actinides substitute for burnable poison directly within burnable poison rods. Simulation calculation indicates that the two loading patterns can load approximately equivalent to 5–6 PWR annual minor actinide yields without disturbing the PWR k eff markedly. The PWR k eff can return criticality again by slightly reducing the boric acid concentration in the coolant of PWR or removing some burnable poison rods without coating the minor actinide transmutation materials from PWR core. In other words, loading minor actinide transmutation material to PWR does not consume extra neutron, minor actinide just consumes the neutrons which absorbed by the removed control poisons. Both minor actinide loading patterns are technically feasible; most importantly do not need to modify the configuration of the PWR core and

  7. The investigation of Passive Accident Mitigation Scheme for advanced PWR NPP

    International Nuclear Information System (INIS)

    Shi, Er-bing; Fang, Cheng-yue; Wang, Chang; Xia, Geng-lei; Zhao, Cui-na

    2015-01-01

    Highlights: • We put forward a new PAMS and analyze its operation characteristics under SBO. • We conduct comparative analysis between PAMS and Traditional Secondary Side PHRS. • The PAMS could cope with SBO accident and maintain the plant in safe conditions. • PAMS could decrease heat removal capacity of PHRS. • PAMS has advantage in reducing cooling rate and PCCT temperature rising amplitude. - Abstract: To enhance inherent safety features of nuclear power plant, the advanced pressurized water reactors implement a series of passive safety systems. This paper puts forward and designs a new Passive Accident Mitigation Scheme (PAMS) to remove residual heat, which consists of two parts: the first part is Passive Auxiliary Feedwater System (PAFS), and the other part is Passive Heat Removal System (PHRS). This paper takes the Westinghouse-designed Advanced Passive PWR (AP1000) as research object and analyzes the operation characteristics of PAMS to cope with the Station Blackout Accident (SBO) by using RELAP5 code. Moreover, the comparative analysis is also conducted between PAMS and Traditional Secondary Circuit PHRS to derive the advantages of PAMS. The results show that the designed scheme can remove core residual heat significantly and maintain the plant in safe conditions; the first part of PAMS would stop after 120 min and the second part has to come into use simultaneously; the low pressurizer (PZR) pressure signal would be generated 109 min later caused by coolant volume shrinkage, which would actuate the Passive Safety Injection System (PSIS) to recovery the water level of pressurizer; the flow instability phenomenon would occur and last 21 min after the PHRS start-up; according to the comparative analysis, the coolant average temperature gradient and the Passive Condensate Cooling Tank (PCCT) water temperature rising amplitude of PAMS are lower than those of Traditional Secondary Circuit PHRS

  8. Valve testing for UK PWR safety applications

    International Nuclear Information System (INIS)

    George, P.T.; Bryant, S.

    1989-01-01

    Extensive testing and development has been done by the Central Electricity Generating Board (CEGB) to support the design, construction and operation of Sizewell B, the UK's first PWR. A Blowdown Rig for the Assessment of Valve Operability - (BRAVO) has been constructed at the CEGB Marchwood Engineering Laboratory to reproduce PWR Pressurizer fluid conditions for the full scale testing of Pressurizer Relief System (PRS) valves. A full size tandem pair of Pilot Operated Safety Relief Valves (POSRVs) is being tested under the full range of pressurizer fluid conditions. Tests to date have produced important data on the performance of the valve in its Cold Overpressure protection mode of operation and on methods for the in-service testing of the valve. Also, a full size pressurizer safety valve has been tested under full PRS fluid conditions to develop a methodology for the pre-service testing of the Sizewell valves. Further work will be carried out to develop procedures for the in-service testing of the valve. In the Main Steam Safety Valve test program carried out at the Siemens-KWU Test Facilities, a single MSSV from three potential suppliers was tested under full secondary system conditions. The test results have been analyzed and are reflected in the CEGB's arrangements for the pre-service and in-service testing of the Sizewell MSSVs. Valves required to interrupt pipebreak flow must be qualified for this duty by testing or a combination of testing and analysis. To obtain guidance on the performance of such tests gate and globe valves have been subjected to simulated pipebreaks under PWR primary circuit conditions. In the light of problems encountered with gate valve closure under these conditions, further tests are currently being carried out on the BRAVO facility on a gate valve, in preparation for the full scale flow interruption qualification testing of the Sizewell main steam isolation valve

  9. Improving electron beam weldability of heavy steel plates for PWR-steam generator

    International Nuclear Information System (INIS)

    Tomita, Yukio; Mabuchi, Hidesato; Koyama, Kunio

    1996-01-01

    Installation and replacement of many PWR-steam generators are planned inside and outside Japan. The steel plates for steam generators are heavy in thickness, and increase the number of welding passes and prolong the welding time. Electron beam welding (EBW) can greatly reduce the welding period compared with conventional welding methods (narrow-gap gas metal arc welding (GMAW) and submerged arc welding (SAW)). The problems in applying EBW are to prevent weld defects and to improve the toughness of the weld metal. Defect-free welding procedures were successfully established even in thick steel plates. The factors that deteriorate weld-metal (WM) toughness of EBW were investigated. The manufacturing process, which utilizes a new secondary refining process at steelmaking and a high-torque mill at plate mill in actual mass-production, were established. EBW base metal and WM have better properties including fracture toughness than those of conventional welding processes. As a result, an application of EBW to the fabrication of PWR-steam generators has become possible. Large amounts of ASTM A533 Gr B Cl 2 (JIS SQV2B) steel plates in actual PWR-steam generators have come to be produced (more than 1,500 ton) by applying EBW. (author)

  10. PWR systems transient analysis

    International Nuclear Information System (INIS)

    Kennedy, M.F.; Peeler, G.B.; Abramson, P.B.

    1985-01-01

    Analysis of transients in pressurized water reactor (PWR) systems involves the assessment of the response of the total plant, including primary and secondary coolant systems, steam piping and turbine (possibly including the complete feedwater train), and various control and safety systems. Transient analysis is performed as part of the plant safety analysis to insure the adequacy of the reactor design and operating procedures and to verify the applicable plant emergency guidelines. Event sequences which must be examined are developed by considering possible failures or maloperations of plant components. These vary in severity (and calculational difficulty) from a series of normal operational transients, such as minor load changes, reactor trips, valve and pump malfunctions, up to the double-ended guillotine rupture of a primary reactor coolant system pipe known as a Large Break Loss of Coolant Accident (LBLOCA). The focus of this paper is the analysis of all those transients and accidents except loss of coolant accidents

  11. PWR-to-PWR fuel cycle model using dry process

    International Nuclear Information System (INIS)

    Iqbal, M.; Jeong, Chang Joon; Rho, Gyu Hong

    2002-03-01

    PWR-to-PWR fuel cycle model has been developed to recycle the spent fuel using the dry fabrication process. Two types of fuels were considered; first fuel was based on low initial enrichment with low discharge burnup and second one was based on more initial enrichment with high discharge burnup in PWR. For recycling calculations, the HELIOS code was used, in which all of the available fission products were considered. The decay of 10 years was applied for reuse of the spent fuel. Sensitivity analysis for the fresh feed material enrichment has also been carried out. If enrichment of the mixing material is increased the saving of uranium reserves would be decreased. The uranium saving of low burned fuel increased from 4.2% to 7.4% in fifth recycling step for 5 wt% to 19.00wt% mixing material enrichment. While for high burned fuel, there was no uranium saving, which implies that higher uranium enrichment required than 5 wt%. For mixing of 15 wt% enriched fuel, the required mixing is about 21.0% and 37.0% of total fuel volume for low and high burned fuel, respectively. With multiple recycling, reductions in waste for low and high burned fuel became 80% and 60%, for first recycling, respectively. In this way, waste can be reduced more and the cost of the waste disposal reduction can provide the economic balance

  12. PWR secondary water chemistry study

    International Nuclear Information System (INIS)

    Pearl, W.L.; Sawochka, S.G.; Copley, S.E.; Siegwarth, D.P.

    1981-01-01

    Secondary water chemistry studies have been performed at ten operating PWRs for the past several years. The program includes seven PWRs with recirculating U-tube steam generators, and three once-through steam generator (OTSG) PWRs. Program results indicate that during periods of minimal condenser inleakage, condensate polishers do not remove significant quantities of sodium, chloride and sulfate. At higher inlet impurity levels, demineralizer removal efficiencies improve markedly. Corrosion product removal efficiencies generally are 60 to 95% depending on system design and operating practices. Significant quantities of sodium and chloride 'hide out' in steam generators with a portion returning during transients, particularly during plant shutdowns. In OTSG PWRs, a significant portion of the total sodium and chloride transported via the steam is removed with the moisture separator drains (MSD) and returned to the OTSG when MSDs are pumped forward. Partial return of MSDs to the condenser would result in reduced feedwater and steam impurity levels. (author)

  13. Sizes of secondary plant components for modularized IRIS balance of plant design

    International Nuclear Information System (INIS)

    Williamson, Martin; Townsend, Lawrence

    2003-01-01

    Herein we report on a conceptual design for a balance of plant (BOP) layout to coordinate with IRIS-like plants. The report consists of results of calculations that sizes of various BOP components. These calculations include the thermodynamic analyses and general sizing of the components in order to determine plant capability and plant layout for studies on modularity and transportability. Mathematical modeling of the BOP system involves a modified ORCENT2 code as well as standard heat transfer methods. Using typical values for PWR type plants, a general BOP design, and IRIS steam generator values, an ORCENT2 heat balance is carried out for the secondary side of the plant. Using the ORCENT2 output, standard heat transfer methods are then used to calculate system performance and component sizes. (author)

  14. Reactor control system. PWR

    International Nuclear Information System (INIS)

    2009-01-01

    At present, 23 units of PWR type reactors have been operated in Japan since the start of Mihama Unit 1 operation in 1970 and various improvements have been made to upgrade operability of power stations as well as reliability and safety of power plants. As the share of nuclear power increases, further improvements of operating performance such as load following capability will be requested for power stations with more reliable and safer operation. This article outlined the reactor control system of PWR type reactors and described the control performance of power plants realized with those systems. The PWR control system is characterized that the turbine power is automatic or manually controlled with request of the electric power system and then the nuclear power is followingly controlled with the change of core reactivity. The system mainly consists of reactor automatic control system (control rod control system), pressurizer pressure control system, pressurizer water level control system, steam generator water level control system and turbine bypass control system. (T. Tanaka)

  15. Two, three and four buttressed PWR containment vessels. A comparative study

    International Nuclear Information System (INIS)

    Dufour, C.J.; Cheyrezy, M.H.; Thorsen, N.E.

    1977-01-01

    The purpose of the paper is to analyse the advantages and drawbacks of different arrangements of hood tendons and buttresses for a PWR containment vessel. It is shown that the solution with two buttresses and full hoop tendons (through 360 0 ) gives: acceptable secondary stresses and strains; a lower total cost of the prestressing; a shorter time schedule for prestressing operations; a smaller 'forbidden area' for the penetration lay out. This arrangement has been used for the first time (to our knowledge) in PWR containment design for the nuclear plant of DOEL III, Belgium. The comparative study has been carried out for a containment vessel with a 85 cm thick wall and an interior diameter of 42.50 m. The Guaranteed Ultimate Tensile Strength of the tendons is 9000 KN. The minimum required prestressing force is 10 300 KN per linear meter of height. The buttresses are 4.0 m long and 1.70 m thick on their vertical centerline. The following arrangements have been studied: 4 buttresses and 3/4 hoop tendons; 3 buttresses and 2/3 hoop tendons; 3 buttresses and full hoop tendons; 2 buttresses and full hoop tendons. The ovalisation and other secondary effects result mainly from three different causes: the average prestressing force is not constant around a hoop; the buttress itself constitutes a sudden thickening and creates local disturbances even under an axisymmetric loading: the anchored tendons are straight over their first 6 meters and they initiate local stress perturbations in the vicinity of the junction of the buttress and the wall. The determination of these secondary effects has been performed by a plane stress finite element analysis

  16. Fuel performance under normal PWR conditions: A review of relevant experimental results and models

    Science.gov (United States)

    Charles, M.; Lemaignan, C.

    1992-06-01

    Experiments conducted at Grenoble (CEA/DRN) over the past 20 years in the field of nuclear fuel behaviour are reviewed. Of particular concern is the need to achieve a comprehensive understanding of and subsequently overcome the limitations associated with high burnup and load-following conditions (pellet-cladding interaction (PCI), fission gas release (FGR), water-side corrosion). A general view is given of the organization of research work as well as some experimental details (irradiation, postirradiation examination — PIE). Based on various experimental programmes (Cyrano, Medicis, Anemone, Furet, Tango, Contact, Cansar, Hatac, Flog, Decor), the main contributions of the thermomechanical behaviour of a PWR fuel rod are described: thermal conductivity, in-pile densification, swelling, fission gas release in steady state and moderate transient conditions, gap thermal conductance, formation of primary and secondary ridges under PCI conditions. Specific programmes (Gdgrif, Thermox, Grimox) are devoted to the behaviour of particular fuels (gadolinia-bearing fuel, MOX fuel). Moreover, microstructure-based studies have been undertaken on fission gas release (fine analysis of the bubble population inside irradiated fuel samples), and on cladding behaviour (PCI related studies on stress-corrosion cracking (SCO, irradiation effects on zircaloy microstructure).

  17. Televisual inspection of cleanliness in secondary side of steam generator

    International Nuclear Information System (INIS)

    Zhou Shoukang; Ding Xunshen

    1995-01-01

    For U-type tube steam generator (UTSG), the deposit will be piled on the low velocity area of tubesheet, tube bundle and support plates during operation. The deposit is the hidden region of pollutant, and the concentration effect will create the corrosion situation in secondary side of steam generator. So, it is very necessary to inspect the cleanliness of SG. The paper introduces the technique of cleanliness inspection with the VP3 1TV apparatus. The steam generator cleanliness inspection of GNP unit 1 and 2, after installation, major transients and commercial operation, shows that the 1TV technique not only provides the cleanliness condition of tubesheet, and removes the loose foreign object, but also provides the basis for the determination of lancing procedure, confirms the result of lancing, and gets the cleanliness conclusion according to the appropriate qualified standard

  18. Development of laser repair technique for cutting impurities in secondary side of a steam generator

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Cheol Jung; Chung, Chin Man; Kim, Min Suk; Jeong, Tae Moon

    1999-12-01

    In this research, the laser repair technique was investigated for the purpose of cutting impurities in secondary side of a steam generator. For this research, a high quality Nd:YAG laser was manufactured and the beam delivery experiments was performed with multimode optical fibers. Also, the small size focusing system was designed and fabricated for remote cutting and the laser cutting experiment was performed. (author)

  19. Observations of crud deposits, corrosion and erosion of BWR and PWR fuel

    International Nuclear Information System (INIS)

    Bairiot, H.

    1983-01-01

    The BWR experience is limited to one reactor but the PWR experience covers a wide range of successive generations of power plants (7 in total). The systems are described and their water chemistry briefly commented. Some R and D performed on the effects of the operating regimes (steady state and transients) are summarized. Observations made by pool-side inspections and postirradiation examinations of fuel are outlined concerning water chemistry effects (crud deposits and corrosion) and ''mechanical'' coolant-cladding interaction (chip deposits and baffle jetting). (author)

  20. Steam-Generator Integrity Program/Steam-Generator Group Project

    International Nuclear Information System (INIS)

    1982-10-01

    The Steam Generator Integrity Program (SGIP) is a comprehensive effort addressing issues of nondestructive test (NDT) reliability, inservice inspection (ISI) requirements, and tube plugging criteria for PWR steam generators. In addition, the program has interactive research tasks relating primary side decontamination, secondary side cleaning, and proposed repair techniques to nondestructive inspectability and primary system integrity. The program has acquired a service degraded PWR steam generator for research purposes. This past year a research facility, the Steam Generator Examination Facility (SGEF), specifically designed for nondestructive and destructive examination tasks of the SGIP was completed. The Surry generator previously transported to the Hanford Reservation was then inserted into the SGEF. Nondestructive characterization of the generator from both primary and secondary sides has been initiated. Decontamination of the channelhead cold leg side was conducted. Radioactive field maps were established in the steam generator, at the generator surface and in the SGEF

  1. Lightweight submersed 'Walking' NDE manipulators for PWR and BWR vessel weld inspection

    Energy Technology Data Exchange (ETDEWEB)

    Saernmark, Ivan; Lenz, Herbert [WesDyne TRC AB, Stockholm (Sweden)

    2008-04-15

    Three new manipulators developed by WesDyne TRC in Sweden have under the year 2007 performed three very successful inspections in the PWR reactor Ringhals 3 and the BWR reactors Ringhals 1 and Oskarshamn 1. The manipulator systems can be used to perform inspection of circumferential and vertical welds on the reactor pressure vessel, the core shroud, core shroud support in BWR reactors or vessel and core barrel welds in PWR reactors. Most other flat or curved surfaces can be inspected using the new concept through relatively simple mechanical reconfigurations of system modules. The first inspection was performed on the R3 PWR core barrel in June 2007 with a very good result. This Manipulator is designed for access in very narrow gaps and for the type of core barrels with a shield covering the whole area of the perimeter. The manipulator is attached to the inspection area by means of a new unique suction cup system. The current manipulators consist of a curved horizontal beam, with radius similar to the reactor vessel, and a straight vertical beam, forming a T-shaped structure. By alternating the application of suction cup pairs on the horizontal beam and the vertical beam and by driving the scanning motors, the manipulator performs an incremental translational movement upwards/downwards or from side to side. The principles of this system give a well defined and stable platform for global and local positioning accuracy. A combination of advanced sensor solutions provides accurate position information in the absence of other physical reference objects. The system is controlled by the new WesDyne TRC Motor Control Panel and software, the MCP is specifically designed for remote control of submersed manipulators using techniques for cable reduction.

  2. PWR secondary water chemistry diagnostic system

    International Nuclear Information System (INIS)

    Miyazaki, S.; Hattori, T.; Yamauchi, S.; Kato, A.; Suganuma, S.; Yoshikawa, T.

    1989-01-01

    Water chemistry control is one of the most important tasks in order to maintain the reliability of plant equipments and extend operating life of the plant. We developed an advanced water chemistry management system which is able to monitor and diagnose secondary water chemistry. A prototype system had been installed at one plant in Japan since Nov. 1986 in order to evaluate system performance and man-machine interface. The diagnosis system has been successfully tested off line using synthesized plant data for various cases. We are continuing to improve the applicability and develop new technology which make it evaluate steam generator crevice chemistry. (author)

  3. Long-term preventive maintenance of instrumentation control equipment for PWR plants

    International Nuclear Information System (INIS)

    Sugitani, S.; Nanba, M.

    2006-01-01

    Since the PWR plants in Japan have been operated more than 30 years, main instrumentation control equipment of analog systems has been renewed to digital control systems. Renewal works had to be done in short period within periodical inspection term and for several facilities. The Mitsubishi LTD group had been provided with these market needs by its digital control system (MELTAC-NplusR 3) applicable to main instrumentation control equipment for primary and secondary systems and had already finished the renewal for practical plants. (T. Tanaka)

  4. High Cooling Water Temperature Effects on Design and Operational Safety of NPPs in the Gulf Region

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Byung Koo [Khalifa Univ., Abu Dhabi (United Arab Emirates); Jeong, Yong Hoon [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2013-12-15

    The Arabian Gulf region has one of the highest ocean temperatures, reaching above 35 degrees and ambient temperatures over 50 degrees in the summer. Two nuclear power plants (NPP) are being introduced in the region for the first time, one at Bushehr (1,000 MWe PWR plant from Russia), and a much larger one at Barakah (4Χ1,400 MWe PWR from Korea). Both plants take seawater from the Gulf for condenser cooling, having to modify the secondary/tertiary side cooling systems design by increasing the heat transfer surface area from the country of origin. This paper analyses the secondary side of a typical PWR plant operating under the Rankine cycle with a simplified thermal-hydraulic model. Parametric study of ocean cooling temperatures is conducted to estimate thermal efficiency variations and its associated design changes for the secondary side. Operational safety is reviewed to deliver rated power output with acceptable safety margins in line with technical specifications, mainly in the auxiliary systems together with the cooling water temperature. Impact on the Gulf seawater as the ultimate heat sink is considered negligible, affecting only the adjacent water near the NPP site, when compared to the solar radiation on the sea surface.

  5. HIGH COOLING WATER TEMPERATURE EFFECTS ON DESIGN AND OPERATIONAL SAFETY OF NPPS IN THE GULF REGION

    Directory of Open Access Journals (Sweden)

    BYUNG KOO KIM

    2013-12-01

    Full Text Available The Arabian Gulf region has one of the highest ocean temperatures, reaching above 35 degrees and ambient temperatures over 50 degrees in the summer. Two nuclear power plants (NPP are being introduced in the region for the first time, one at Bushehr (1,000 MWe PWR plant from Russia, and a much larger one at Barakah (4X1,400 MWe PWR from Korea. Both plants take seawater from the Gulf for condenser cooling, having to modify the secondary/tertiary side cooling systems design by increasing the heat transfer surface area from the country of origin. This paper analyses the secondary side of a typical PWR plant operating under the Rankine cycle with a simplified thermal-hydraulic model. Parametric study of ocean cooling temperatures is conducted to estimate thermal efficiency variations and its associated design changes for the secondary side. Operational safety is reviewed to deliver rated power output with acceptable safety margins in line with technical specifications, mainly in the auxiliary systems together with the cooling water temperature. Impact on the Gulf seawater as the ultimate heat sink is considered negligible, affecting only the adjacent water near the NPP site, when compared to the solar radiation on the sea surface.

  6. PWR station blackout transient simulation in the INER integral system test facility

    International Nuclear Information System (INIS)

    Liu, T.J.; Lee, C.H.; Hong, W.T.; Chang, Y.H.

    2004-01-01

    Station blackout transient (or TMLB' scenario) in a pressurized water reactor (PWR) was simulated using the INER Integral System Test Facility (IIST) which is a 1/400 volumetrically-scaled reduce-height and reduce-pressure (RHRP) simulator of a Westinghouse three-loop PWR. Long-term thermal-hydraulic responses including the secondary boil-off and the subsequent primary saturation, pressurization and core uncovery were simulated based on the assumptions of no offsite and onsite power, feedwater and operator actions. The results indicate that two-phase discharge is the major depletion mode since it covers 81.3% of the total amount of the coolant inventory loss. The primary coolant inventory has experienced significant re-distribution during a station blackout transient. The decided parameter to avoid the core overheating is not the total amount of the coolant inventory remained in the primary core cooling system but only the part of coolant left in the pressure vessel. The sequence of significant events during transient for the IIST were also compared with those of the ROSA-IV large-scale test facility (LSTF), which is a 1/48 volumetrically-scaled full-height and full-pressure (FHFP) simulator of a PWR. The comparison indicates that the sequence and timing of these events during TMLB' transient studied in the RHRP IIST facility are generally consistent with those of the FHFP LSTF. (author)

  7. Activity transport models for PWR primary circuits; PWR-ydinvoimalaitoksen primaeaeripiirin aktiivisuuskulkeutumismallit

    Energy Technology Data Exchange (ETDEWEB)

    Tanner, V; Rosenberg, R [VTT Chemical Technology, Otaniemi (Finland)

    1995-03-01

    The corrosion products activated in the primary circuit form a major source of occupational radiation dose in the PWR reactors. Transport of corrosion activity is a complex process including chemistry, reactor physics, thermodynamics and hydrodynamics. All the mechanisms involved are not known and there is no comprehensive theory for the process, so experimental test loops and plant data are very important in research efforts. Several activity transport modelling attempts have been made to improve the water chemistry control and to minimise corrosion in PWR`s. In this research report some of these models are reviewed with special emphasis on models designed for Soviet VVER type reactors. (51 refs., 16 figs., 4 tabs.).

  8. An innovative strategy for secondary side system lay-up using film-forming amines

    International Nuclear Information System (INIS)

    Ramminger, U.; Drexler, A.; Fandrich, J.

    2012-01-01

    The major safety function of steam generators (SG) in pressurized reactors is well known as acting as a barrier between the radioactive primary side and the non-radioactive secondary side. The main reason for SG tube failure is known to be the accumulation of deposits contributing to formation of local aggressive conditions. Consequently the SG has to be kept as clean as possible and the corrosion product transport into the SG has to be minimized. In order to reach this target, plant operators are making worldwide huge efforts to protect plant systems against corrosion during standstill and outages. Especially in case of large component replacements campaigns like steam generator or fuel channel replacements which are linked to prolonged outages lay-up strategies become important. The use of surface active agents like film-forming amines (FFA) has become very popular in the fossil power plant sector, showing a decrease of corrosion product generation by improving the surface conditions. The adherent non wettable film built by FFA acts as a shield that limits the access of water and hydrated species to the metal or metal oxide surface. This barrier lowers the corrosion rate by inhibiting the mass transfer between surface and solution. The hydrocarbon chain imparts a hydrophobic character while the amine group bounds to the metal. Advantages of the FFA application for lay-up: Significant reduction of lay-up efforts; Long-term stability of the protective film even in aggressive environmental conditions; No influence on existing oxide layers; No negative influence on plant operation and performance; No environmental hazards of the waste water after system lay-up. Nevertheless application of film-forming amines are applied in fossil fired power plants, the requirement of nuclear power reactors are more ambitious. This paper deals with a possible lay-up application scenario in pressurized heavy water reactors. The proposed lay-up strategy will consider AREVAâ

  9. Estimating probable flaw distributions in PWR steam generator tubes

    International Nuclear Information System (INIS)

    Gorman, J.A.; Turner, A.P.L.

    1997-01-01

    This paper describes methods for estimating the number and size distributions of flaws of various types in PWR steam generator tubes. These estimates are needed when calculating the probable primary to secondary leakage through steam generator tubes under postulated accidents such as severe core accidents and steam line breaks. The paper describes methods for two types of predictions: (1) the numbers of tubes with detectable flaws of various types as a function of time, and (2) the distributions in size of these flaws. Results are provided for hypothetical severely affected, moderately affected and lightly affected units. Discussion is provided regarding uncertainties and assumptions in the data and analyses

  10. PREP-PWR-1.0: a WIMS-D/4 pre-processor code for the generation of data for PWR fuel assemblies

    International Nuclear Information System (INIS)

    Ball, G.

    1991-06-01

    The PREP-PWR-1.0 computer code is a substantially modified version of the PREWIM code which formed part of the original MARIA System (Report J.E.N. 543). PREP-PWR-1.0 is a comprehensive pre-processor code which generates input data for the WIMS-D/4.1 code (Report PEL 294) for PWR fuel assemblies, with or without control and burnable poison rods. This data is generated at various base and off-base conditions. The overall cross section generation methodology is described, followed by a brief overview of the model. Aspects of the base/off-base calculational scheme are outlined. Additional features of the code are described while the input data format of PREP-PWR-1.0 is listed. The sample problems and suggestions for further improvements to the code are also described. 2 figs., 2 tabs., 12 refs

  11. Operating experience with steam generator water chemistry in Japanese PWR plants

    International Nuclear Information System (INIS)

    Onimura, K.; Hattori, T.

    1991-01-01

    Since the first PWR plant in Japan started its commercial operation in 1970, seventeen plants are operating as of the end of 1990. First three units initially applied phosphate treatment as secondary water chemistry control and then changed to all volatile treatment (AVT) due to phosphate induced wastage of steam generator tubing. The other fourteen units operate exclusively under AVT. In Japan, several corrosion phenomena of steam generator tubing, resulted from secondary water chemistry, have been experienced, but occurrence of those phenomena has decreased by means of improvement on impurity management, boric acid treatment and high hydrazine operation. Recently secondary water chemistry in Japanese plants are well maintained in every stage of operation. This paper introduces brief summary of the present status of steam generators and secondary water chemistry in Japan and ongoing activities of investigation for future improvement of reliability of steam generator. History and present status of secondary water chemistry in Japanese PWRs were introduced. In order to get improved water chemistry, the integrity of secondary system equipments is essential and the improvement in water chemistry has been achieved with the improvement in equipments and their usage. As a result of those efforts, present status of secondary water is excellent. However, further development for crevice chemistry monitoring technique and an advanced water chemistry data management system is desired for the purpose of future improvement of reliability of steam generator

  12. Predictive models for deposit accumulation and corrosion on secondary side of steam generators

    International Nuclear Information System (INIS)

    Choi, Samuel; Moroney, Velvet; Marks, Chuck; Kreider, Marc

    2012-09-01

    Experience demonstrates that deposit accumulation in steam generators (SGs) can lead to corrosion of tubes. To minimize the probability of this corrosion, utilities employ a variety of deposit control strategies. However, these processes can involve significant costs and potentially affect outage critical paths. Since there has been no model that quantifies tube degradation as a function of deposit accumulation, utilities have had to make decisions regarding deposit control strategies without a reliable quantitative basis. The objective of this study is to develop methods that utilities can use to quantify benefits of SG deposit control strategies with regard to rates of secondary-side tube corrosion. Two different methodologies are employed in this work. The first methodology is empirical and is involved an attempt to correlate degradation rates with deposit accumulation as indicated by sludge pile height. Because there has been relatively little tube degradation in currently operating steam generators, this correlation is developed using data for Alloy 600MA SG tubes. To increase the number of units that could be used for defect/deposit correlations, a method to relate the sludge pile deposit mass and the number of tubes with non-zero sludge height is developed. The second methodology is theoretical and is based on the use of calculated differences in temperature and chemistry to predict the effect of deposits on corrosion rates. Computational fluid dynamics (CFD) models are developed to simulate thermal-hydraulic conditions representative of conditions that are present within porous deposits formed at the top of tube sheet. This paper will discuss the development and application of the predictive models for deposit accumulation and corrosion on the secondary side of steam generators. (authors)

  13. PWR AXIAL BURNUP PROFILE ANALYSIS

    International Nuclear Information System (INIS)

    J.M. Acaglione

    2003-01-01

    The purpose of this activity is to develop a representative ''limiting'' axial burnup profile for pressurized water reactors (PWRs), which would encompass the isotopic axial variations caused by different assembly irradiation histories, and produce conservative isotopics with respect to criticality. The effect that the low burnup regions near the ends of spent fuel have on system reactivity is termed the ''end-effect''. This calculation will quantify the end-effects associated with Pressurized Water Reactor (PWR) fuel assemblies emplaced in a hypothetical 21 PWR waste package. The scope of this calculation covers an initial enrichment range of 3.0 through 5.0 wt% U-235 and a burnup range of 10 through 50 GWd/MTU. This activity supports the validation of the process for ensuring conservative generation of spent fuel isotopics with respect to criticality safety applications, and the use of burnup credit for commercial spent nuclear fuel. The intended use of these results will be in the development of PWR waste package loading curves, and applications involving burnup credit. Limitations of this evaluation are that the limiting profiles are only confirmed for use with the B andW 15 x 15 fuel assembly design. However, this assembly design is considered bounding of all other typical commercial PWR fuel assembly designs. This calculation is subject to the Quality Assurance Requirements and Description (QARD) because this activity supports investigations of items or barriers on the Q-list (YMP 2001)

  14. Management routes for materials arising from the decommissioning of a PWR reactor

    International Nuclear Information System (INIS)

    Klein, M.; Demeulemeester, Y.; Moers, S.; Ponnet, M.

    2001-01-01

    The management of wastes from decommissioning is described for the on-going dismantling of the BR3 PWR small reactor. The incentive is put on the radionuclides characterization, the description of the various waste streams, the conditioning techniques for low radioactive waste (LAW) to high radioactive waste (RAW), the alternative evacuation routes (recycling in the nuclear, free release by decontamination) and the minimization of secondary wastes during dismantling. Finally, some considerations are given on the overall dismantling cost and on the relative costs of the various evacuation routes. (author)

  15. Relap5/mod2 post-test calculation of a loss of feedwater experiment at the Pactel test facility

    Energy Technology Data Exchange (ETDEWEB)

    Protze, M. [Siemens-KWU, Erlangen (Germany)

    1995-12-31

    Post-test calculations for verification purposes of the thermal hydraulic code RELAP5/MOD2 are of fundamental importance for the licensing procedure. The RELAP5/MOD2 code has a large international assessment base regarding western PWR. WWER-reactors are russian designed PWRs with some specific differences compared with the western PWR`s, especially the horizontal steam generators. For that reason some post-test calculations have to be performed to verify the RELAP5/MOD2 code for these WWER typical phenomena. The impact of the horizontal steam generators on the accident behaviour during transients or pipe ruptures on the secondary side is significant. The nodalization of the test facility PACTEL was chosen equally to WWER plant nodalization to verify the use of a coarse modelling of the steam generator secondary side for analyses of transient with decreasing water level in the SG secondary side. The calculational results showed a good compliance to the test results, demonstrating the correct use of a coarse nodalization. To sum up, the RELAP5/ MOD2 results met the test results appropriately thereby the RELAP5/ MOD2 code is validated for analyses of transients with decreasing water level in a horizontal steam generator secondary side. (orig.). 4 refs.

  16. Relap5/mod2 post-test calculation of a loss of feedwater experiment at the Pactel test facility

    Energy Technology Data Exchange (ETDEWEB)

    Protze, M [Siemens-KWU, Erlangen (Germany)

    1996-12-31

    Post-test calculations for verification purposes of the thermal hydraulic code RELAP5/MOD2 are of fundamental importance for the licensing procedure. The RELAP5/MOD2 code has a large international assessment base regarding western PWR. WWER-reactors are russian designed PWRs with some specific differences compared with the western PWR`s, especially the horizontal steam generators. For that reason some post-test calculations have to be performed to verify the RELAP5/MOD2 code for these WWER typical phenomena. The impact of the horizontal steam generators on the accident behaviour during transients or pipe ruptures on the secondary side is significant. The nodalization of the test facility PACTEL was chosen equally to WWER plant nodalization to verify the use of a coarse modelling of the steam generator secondary side for analyses of transient with decreasing water level in the SG secondary side. The calculational results showed a good compliance to the test results, demonstrating the correct use of a coarse nodalization. To sum up, the RELAP5/ MOD2 results met the test results appropriately thereby the RELAP5/ MOD2 code is validated for analyses of transients with decreasing water level in a horizontal steam generator secondary side. (orig.). 4 refs.

  17. Seismic qualification of PWR plant auxiliary feedwater systems

    International Nuclear Information System (INIS)

    Lu, S.C.; Tsai, N.C.

    1983-08-01

    The NRC Standard Review Plan specifies that the auxiliary feedwater (AFW) system of a pressurized water reactor (PWR) is a safeguard system that functions in the event of a Safe Shutdown Earthquake (SSE) to remove the decay heat via the steam generator. Only recently licensed PWR plants have an AFW system designed to the current Standard Review Plan specifications. The NRC devised the Multiplant Action Plan C-14 in order to make a survey of the seismic capability of the AFW systems of operating PWR plants. The purpose of this survey is to enable the NRC to make decisions regarding the need of requiring the licensees to upgrade the AFW systems to an SSE level of seismic capability. To implement the first phase of the C-14 plan, the NRC issued a Generic Letter (GL) 81-14 to all operating PWR licensees requesting information on the seismic capability of their AFW systems. This report summarizes Lawrence Livermore National Laboratory's efforts to assist the NRC in evaluating the status of seismic qualification of the AFW systems in 40 PWR plants, by reviewing the licensees' responses to GL 81-14

  18. Characterization of Factors affecting IASCC of PWR Core Internals

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Woo; Hwang, Seong Sik; Kim, Won Sam [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2008-09-15

    A lot works have been performed on IASCC in BWR. Recent efforts have been devoted to investigate IASCC in PWR, but the mechanism in PWR is not fully understood yet as compared with that in BWR due to a lack of data from laboratories and fields. Therefore it is strongly needed to review and analyse recent researches of IASCC in both BWR and PWR for establishing a proactive management technology for IASCC of core internals in Korean PWRs. This work is aimed to review mainly recent technical reports on IASCC of stainless steels for core internals in PWR. For comparison, the works on IASCC in BWR were also reviewed and briefly introduced in this report.

  19. PWR and WWER fuel performance. A comparison of major characteristics

    International Nuclear Information System (INIS)

    Weidinger, H.

    2006-01-01

    PWR and WWER fuel technologies have the same basic performance targets: most effective use of the energy stored in the fuel and highest possible reliability. Both fuel technologies use basically the same strategies to reach these targets: 1) Optimized reload strategies; 2) Maximal use of structural material with low neutron cross sections; 3) Decrease the fuel failure frequency towards a 'zero failure' performance by understanding and eliminating the root causes of those defects. The key driving force of the technology of both, PWR and WWER fuel is high burn-up. Presently a range of 45 - 50 MWD/kgU have been reached commercially for PWR and WWER fuel. The main technical limitations to reach high burn-up are typically different for PWR and WWER fuel: for PWR fuel it is the corrosion and hydrogen uptake of the Zr-based materials; for WWER fuel it is the mechanical and dimensional stability of the FA (and the whole core). Corrosion and hydrogen uptake of Zr-materials is a 'non-problem' for WWER fuel. Other performance criteria that are important for high burn-up are the creep and growth behaviour of the Zr materials and the fission gas release in the fuel rod. There exists a good and broad data base to model and design both fuel types. FA and fuel rod vibration appears to be a generic problem for both fuel types but with more evidence for PWR fuel performance reliability. Grid-to-rod fretting is still a major issue in the fuel failure statistics of PWR fuel. Fuel rod cladding defects by debris fretting is no longer a key problem for PWR fuel, while it still appears to be a significant root cause for WWER fuel failures. 'Zero defect' fuel performance is achievable with a high probability, as statistics for US PWR and WWER-1000 fuel has shown

  20. Evaluation of hideout return data from U.S. PWR steam generators

    International Nuclear Information System (INIS)

    Connor, W.M.; Richards, J.E.

    1988-01-01

    Since the middle to late 1970's, dramatic reductions in the quantities of impurities in the bulkwater of PWR steam generators have been made by U.S. utilities. Today most utilities operate at full power with impurity concentrations in the steam generator blowdown in the low ppb range, well within existing industry guideline control limits. Despite these efforts, some of these same utilities have subsequently encountered secondary side stress corrosion cracking (SCC) and intergranular attack (IGA) of steam generator tubing within deep tubesheet crevices and more recently at tube support intersections. It must, therefore, be concluded that either continuous low level input of contaminants within existing guideline limits, or intermittent short duration input, undetected by either current sampling and analysis techniques or procedures, are permitting ingress of corrosive impurity species which subsequently concentrate in flow-occluded regions to produce localized tube corrosion. To better understand both the quantity and composition of accumulated impurity species, more and more utilities, even those who have not experienced any steam generator corrosion, have begun to perform rigorous sampling and analysis evaluations of returning chemical contaminants each time the units are brought off-line. This paper will show examples of how these data are being used by U.S. industry to gain valuable information about accumulated contaminant inventories, to make cycle-to-cycle and plant-to-plant comparisons, and to develop plant specific actions to promote maximum contaminant removal. (author)

  1. Study on mitigation of in-vessel release of fission products in severe accidents of PWR

    International Nuclear Information System (INIS)

    Huang, G.F.; Tong, L.L.; Li, J.X.; Cao, X.W.

    2010-01-01

    Research highlights: → In-vessel release of fission products in severe accidents for 600 MW PWR is analyzed. → Mitigation effect of primary feed-and-bleed on in-vessel release is investigated. → Mitigation effect of secondary feed-and-bleed on in-vessel release is studied. → Mitigation effect of ex-vessel cooling on in-vessel release is evaluated. - Abstract: During the severe accidents in a nuclear power plant, large amounts of fission products release with accident progression, including in-vessel and ex-vessel release. Mitigation of fission products release is demanded for alleviating radiological consequence in severe accidents. Mitigation countermeasures to in-vessel release are studied for Chinese 600 MW pressurized water reactor (PWR), including feed-and-bleed in primary circuit, feed-and-bleed in secondary circuit and ex-vessel cooling. SBO, LOFW, SBLOCA and LBLOCA are selected as typical severe accident sequences. Based on the evaluation of in-vessel release with different startup time of countermeasure, and the coupling relationship between thermohydraulics and in-vessel release of fission products, some results are achieved. Feed-and-bleed in primary circuit is an effective countermeasure to mitigate in-vessel release of fission products, and earlier startup time of countermeasure is more feasible. Feed-and-bleed in secondary circuit is also an effective countermeasure to mitigate in-vessel release for most severe accident sequences that can cease core melt progression, e.g. SBO, LOFW and SBLOCA. Ex-vessel cooling has no mitigation effect on in-vessel release owing to inevitable core melt and relocation.

  2. Sizewell 'B' PWR reference design

    International Nuclear Information System (INIS)

    1982-04-01

    The reference design for a PWR power station to be constructed as Sizewell 'B' is presented in 3 volumes containing 14 chapters and in a volume of drawings. The report describes the proposed design and provides the basis upon which the safety case and the Pre-Construction Safety Report have been prepared. The station is based on a 3425MWt Westinghouse PWR providing steam to two turbine generators each of 600 MW. The layout and many of the systems are based on the SNUPPS design for Callaway which has been chosen as the US reference plant for the project. (U.K.)

  3. Program of monitoring PWR fuel in Spain; Programa de Vigilancia de Combustible pwr en Espana

    Energy Technology Data Exchange (ETDEWEB)

    Martinez Murillo, J. C.; Quecedo, M.; Munoz-Roja, C.

    2015-07-01

    In the year 2000 the PWR utilities: Centrales Nucleares Almaraz-Trillo (CNAT) and Asociacion Nuclear Asco-Vandellos (ANAV), and ENUSA Industrias Avanzadas developed and executed a coordinated strategy named PIC (standing for Coordinated Research Program), for achieving the highest level of fuel reliability. The paper will present the scope and results of this program along the years and will summarize the way the changes are managed to ensure fuel integrity. The excellent performance of the ENUSA manufactured fuel in the PWR Spanish NPPs is the best indicator that the expectations on this program are being met. (Author)

  4. Minimum success criteria at SGTR combined with loss of secondary heat sink

    International Nuclear Information System (INIS)

    Parzer, I.; Petelin, S.

    1993-01-01

    A parametric analysis has been performed investigating minimum success criteria for the hypothetical Steam Generator Tube Rupture (SGTR) accident in a Pressurized Water Reactor (PWR) Nuclear Power Plant, combined with the total loss of secondary heat sink. The analyses have been performed by RELAP5/MOD2 and MOD3 computer codes using Krsko NPP input deck. The Krsko NPP is a 2-loop Westinghouse PWR, 640 MWe, located in Slovenia and operating from 1981. Two break sizes have been chosen for the SGTR event: 2 and 5 double-ended broken tubes have been assumed. Total loss of secondary heat sink has been assumed from the beginning of the calculation. The ways of cooling down the plant after the postulated accident have been investigated, including Bleed ampersand Feed through the primary system. The NPP Krsko Emergency Operating Procedures (EOP) have been verified for this case. Some suggestions have been made, how to improve FR-H.1 procedure (Loss of Secondary Heat Sink), to include some steps, which take into account also SGTR when it is combined with loss of secondary heat sink. Possible misinterpretations of E-0 procedure (Reactor Trip or Safety Injection) have been studied

  5. Study on virtual simulation technology for operation and control of PWR

    International Nuclear Information System (INIS)

    Fang Baoguo; Zhang Dafa; Lin Yajun

    2006-01-01

    The way to build graphical models of PWR with MultiGen Creator is discussed, and the three-dimensional model used in the virtual simulation is built. The mathematical simulation model for PWR based on the platform of MFC and Vega is built through the analysis of the mathematical simulation of PWR. The way to perform the virtual effect is introduced associating with the Pressurizer. And, all above parts are connected in one with VC++ to perform the whole virtual simulation of PWR. (authors)

  6. Scaling studies - PWR

    International Nuclear Information System (INIS)

    Sonneck, G.

    1983-05-01

    A RELAP 4/MOD 6 study was made based on the blowdown phase of the intermediate break experiment LOFT L5-1. The method was to set up a base model and to vary parametrically some areas where it is known or suspected that LOFT differs from a commercial PWR. The aim was not to simulate LOFT or a PWR exactly but to understand the influence of the following parameters on the thermohydraulic behaviour of the system and the clad temperature: stored heat in the downcomer (LOFT has rather large filler blocks in this part of the pressure vessel); bypass between downcomer and upper plenum; and core length. The results show that LOFT is prototypical for all calculated blowdowns. As the clad temperatures decrease with decreasing stored energy in the downcomer, increased bypass and increased core length, LOFT results seem to be realistic as long as realistic bypass sizes are considered; they are conservative in the two other areas. (author)

  7. ABB advanced BWR and PWR fuel

    International Nuclear Information System (INIS)

    Junkrans, S.; Helmersson, S.; Andersson, S.

    1999-01-01

    Fuel designed and fabricated by ABB is now operating in 40 PWRs and BWRs in Europe, the United States and Korea. An excellent fuel reliability track record has been established. High burnups are proven for both BWR and PWR. Thermal margin improving features and advanced burnable absorber concepts enable the utilities to adopt demanding duty cycles to meet new economic objectives. In particular we note the excellent reliability record of ABB PWR fuel equipped with Guardian TM debris filter, proven to meet the -6 rod-cycles fuel failure goal, and the out-standing operating record of the SVEA 10x10 BWR fuel, where ABB is the only vendor to date with multi batch experience to high burnup. ABB is dedicated to maintain high fuel reliability as well as continually improve and develop a broad line of BWR and PWR products. ABB's development and fuel follow-up activities are performed in close co-operation with its customers. (orig.)

  8. Parallel GPU implementation of PWR reactor burnup

    International Nuclear Information System (INIS)

    Heimlich, A.; Silva, F.C.; Martinez, A.S.

    2016-01-01

    Highlights: • Three GPU algorithms used to evaluate the burn-up in a PWR reactor. • Exhibit speed improvement exceeding 200 times over the sequential. • The C++ container is expansible to accept new nuclides chains. - Abstract: This paper surveys three methods, implemented for multi-core CPU and graphic processor unit (GPU), to evaluate the fuel burn-up in a pressurized light water nuclear reactor (PWR) using the solutions of a large system of coupled ordinary differential equations. The reactor physics simulation of a PWR reactor spends a long execution time with burnup calculations, so performance improvement using GPU can imply in better core design and thus extended fuel life cycle. The results of this study exhibit speed improvement exceeding 200 times over the sequential solver, within 1% accuracy.

  9. START - glass model of PWR

    International Nuclear Information System (INIS)

    Marn, J.; Ramsak, M.

    1998-01-01

    Recognizing the importance of nuclear engineering in the area of process engineering the University of Maribor, Faculty of Mechanical Engineering has invested in procuring and erecting glass model of pressurized water reactor. This paper deals with description of the model, its capabilities, and plans for its use within nuclear engineering community of Slovenia. The model, made primarily of glass, serves three purposes: educational, professional development and research. As an example, medium break loss of coolant accident is presented in the paper. Temperatures within primary and secondary side, and pressure on primary side of reactor coolant system are followed. The characteristic points are emphasized, and commented.(author)

  10. Secondary Pulmonary Hypertension and Right-Sided Heart Failure at Presentation in Grave's Disease.

    Science.gov (United States)

    Ganeshpure, Swapnil Panjabrao; Vaidya, Gaurang Nandkishor; Gattani, Vipul

    2012-01-01

    A young female presented with evidence of right-sided heart failure and was subsequently found to have significant pulmonary artery hypertension (PAH). Because of her normal left ventricular function and pulmonary capillary wedge pressure, the most probable site of etiology seemed to be the pulmonary vasculature. All the common possible secondary causes of PAH were ruled out, but during the investigations, she was found to have elevated thyroid function tests compatible with the diagnosis of Grave's disease. The treatment of Grave's disease, initially by medications and subsequently by radioiodine therapy, was associated with a significant reduction in the pulmonary artery systolic pressure. The purpose of this case report is to highlight one of the unusual and underdiagnosed presentations of Grave's disease.

  11. Status of developing advanced PWR in Japan

    International Nuclear Information System (INIS)

    Iida, Yotaro

    1982-01-01

    During past eleven years since the first PWR power plant, Mihama Unit 1 of Kansai Electric Power Co., started the commercial operation in 1970, Mitsubishi Heavy Industries has endeavored to improve PWR technologies on the basis of the advice from electric power companies and the technical information to overcome difficulties in PWR power plants. Now, the main objective is to improve the overall plant performance, and the rate of operation of Japanese PWR power plants has significantly risen. The improvement of the reliability, the shortening of regular inspection period and the reduction of radioactive waste handling were attempted. In view of the satisfactory operational experience of Westinghouse type PWRs, the basic reactor concept has not been changed so far. Mitsubishi and Westinghouse reached basic agreement in August, 1981, to develop a spectral shift type large capacity reactor as the advanced PWRs for Japan. This type of PWRs hab higher degree of freedom for extended fuel cycle operation and enhances the advantage of entire fuel cycle economy, particularly the significant reduction of uranium use. The improved neutron economy is attainable by reducing neutron loss, and the core design with low power density and the economical use of plutonium are advantageous for the fuel cycle economy. (Kako, I.)

  12. Modeling local chemistry in PWR steam generator crevices

    International Nuclear Information System (INIS)

    Millett, P.J.

    1997-01-01

    Over the past two decades steam generator corrosion damage has been a major cost impact to PWR owners. Crevices and occluded regions create thermal-hydraulic conditions where aggressive impurities can become highly concentrated, promoting localized corrosion of the tubing and support structure materials. The type of corrosion varies depending on the local conditions, with stress corrosion cracking being the phenomenon of most current concern. A major goal of the EPRI research in this area has been to develop models of the concentration process and resulting crevice chemistry conditions. These models may then be used to predict crevice chemistry based on knowledge of bulk chemistry, thereby allowing the operator to control corrosion damage. Rigorous deterministic models have not yet been developed; however, empirical approaches have shown promise and are reflected in current versions of the industry-developed secondary water chemistry guidelines

  13. Highlights of the French program on PWR fuel

    Energy Technology Data Exchange (ETDEWEB)

    Pages, J P [CEA Centre d` Etudes de Cadarache, 13 - Saint-Paul-lez-Durance (France). Direction des Reacteurs Nucleaires

    1997-12-01

    The presentation reviews the French programme on PWR fuel including the overall results of the year 1996 for nuclear operation; fuel management and economy; French nuclear electricity generation sites; production of nuclear generated electricity; energy availability of the 900 and 1,300 Mw PWR units; average radioactive liquid releases excluding tritium per unit; plutonium recycling experience.

  14. Pushing back the boundaries of PWR fuel performance

    International Nuclear Information System (INIS)

    Sofer, G.A.; Skogen, F.B.; Brown, C.A.; Fresk, Y.U.

    1985-01-01

    In today's fiercely competitive PWR reload market utilities are benefiting from a variety of design innovations which are helping to cut fuel cycle costs and to improve fuel performance. An advanced PWR fuel design from Exxon, for example, currently under evaluation at the Ginna plant in the United States, offers higher burn-up and greater power cycling. (author)

  15. Study of anticipated transient without scram for PWR

    International Nuclear Information System (INIS)

    Pu Jilong.

    1985-01-01

    Anticipated Transient Without Scram (ATWS) of PWR, the one of the 'Unresolved Safety Issue' with NRC, has been investigated for many years. The latest analysis done by the author considers the PWR's inherent stability and long-term performence under the condition of ATWS combined with SBLOCA and studies the sensitivity of several assumptions, which shows positive results

  16. PWR fuel inspection and repair technology development in the Republic of Korea

    International Nuclear Information System (INIS)

    Park, J.Y.

    1998-01-01

    As of September 1997, 10 PWRs and 2 PHWRs generate 10,320MW electricity in Korea. And another 8 PWRs and 2 PHWRs will be constructed by 2006. These will need about 400 MTU of PWR fuels and 400 MTU of PHWR fuels. To improve average burnup, thermal power, fuel usability and plant safety, better poolside fuel service technologies are strongly recommended as well as the fuel design and fabrication technology improvements. During the last twenty years of nuclear power plant operation in Korea, more than 4,000 fuel assemblies has been used. At the site, continuous coolant activity measurement, pool-side visual inspection and ultrasonic tests have been performed. Some of the fuels are damaged or failed for various reasons. Some of the defected fuels were examined in hot cell to investigate the cause of failure. Even though 30 PWR fuel assemblies were repaired by foreign engineers, fuel inspection and repair technologies are not established yet. Various kind of design for the fuel make the inspection, repair and reconstitution equipment more complex. As a result, recently, a plant to obtain overall technology for poolside fuel inspection, failed fuel repair and reconstitution through R and D activities are set forth. (author)

  17. Development of computational program for studying the reactor control system in PWR plants; Desenvolvimento de um programa computacional para estudo do sistema de controle do reator em plantas PWR

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Jose Ricardo de; Soares, Adalberto Jose [Instituto de Pesquisas Energeticas e Nucleares (IPEN), Sao Paulo, SP (Brazil)

    2002-07-01

    In this work a computational program is presented which has been developed for specific application on the study of the reactor control system of a typical PWR plant. As to the basic function of simulating power transients the program has the following structure: a representative mathematical model of the dynamic and stationary behaviors of the primary circuit; a group of equations associated to the reactor power control and system pressure control; screens for the entry of reference data as well as of control blocks and control bar speed programming module parameters; main entering screens for the configuration of the excitement/transient function as well as of simulation time and control mood; and graphical output of all the process variables incorporated to the model. As premise it has been considered as sufficient the modeling of the primary circuit, a differential equation being used which associates the average temperature of the coolant within the steam generator with the potency transferred to the secondary circuit, denominated 'secondary potency', as an interface with the secondary circuit. Every transient - ramp or step - is established upon the 'turbine power' variable, which in turn is related to the 'secondary power' variable by means of a differential equation that represents a first - order delay, having adjustable parameters on the data - entry screen. In the neutronic model as defined for the reactor, the reactivity feedback effects due to primary circuit pressure variation, as well as fuel and coolant temperature variation, were taken into consideration. Thermo-hydraulics constants and project data taken from the available bibliography, adapted to a particular small PWR unit conception , were employed for loading the program. With the open-loop simulation results a positive qualitative evaluation of the program was obtained, in comparison to published results related to simulators bearing equal purposes, more

  18. Trace analysis of auxiliary feedwater capacity for Maanshan PWR loss-of-normal-feedwater transient

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Che-Hao; Shih, Chunkuan [National Tsing Hua Univ., Taiwan (China). Inst. of Nuclear Engineering and Science; Wang, Jong-Rong; Lin, Hao-Tzu [Atomic Energy Council, Taiwan (China). Inst. of Nuclear Energy Research

    2013-07-01

    Maanshan nuclear power plant is a Westinghouse PWR of Taiwan Power Company (Taipower, TPC). A few years ago, TPC has made many assessments in order to uprate the power of Maanshan NPP. The assessments include NSSS (Nuclear Steam Supply System) parameters calculation, uncertainty acceptance, integrity of pressure vessel, reliability of auxiliary systems, and transient analyses, etc. Since the Fukushima Daiichi accident happened, it is necessary to consider transients with multiple-failure. Base on the analysis, we further study the auxiliary feedwater capability for Loss-of-Normal-Feedwater (LONF) transient. LONF is the limiting transient of non-turbine trip initiated event for ATWS (Anticipated Transient Without Scram) which results in a reduction in capability of the secondary system to remove the heat generated in the reactor core. If the turbine fails to trip immediately, the secondary water inventory will decrease significantly before the actuation of auxiliary feedwater (AFW) system. The heat removal from the primary side decreases, and this leads to increases of primary coolant temperature and pressure. The water level of pressurizer also increases subsequently. The heat removal through the relief valves and the auxiliary feedwater is not sufficient to fully cope with the heat generation from primary side. The pressurizer will be filled with water finally, and the RCS pressure might rise above the set point of relief valves for water discharge. RCS pressure depends on steam generator inventory, primary coolant temperature, negative reactivity feedback, and core power, etc. The RCS pressure may reach its peak after core power reduction. According to ASME Code Level C service limit criteria, the Reactor Coolant System (RCS) pressure must be under 22.06 MPa. The USNRC is developing an advanced thermal hydraulic code named TRACE for nuclear power plant safety analysis. The development of TRACE is based on TRAC and integrating with RELAP5 and other programs. SNAP

  19. Trace analysis of auxiliary feedwater capacity for Maanshan PWR loss-of-normal-feedwater transient

    International Nuclear Information System (INIS)

    Chen, Che-Hao; Shih, Chunkuan; Wang, Jong-Rong; Lin, Hao-Tzu

    2013-01-01

    Maanshan nuclear power plant is a Westinghouse PWR of Taiwan Power Company (Taipower, TPC). A few years ago, TPC has made many assessments in order to uprate the power of Maanshan NPP. The assessments include NSSS (Nuclear Steam Supply System) parameters calculation, uncertainty acceptance, integrity of pressure vessel, reliability of auxiliary systems, and transient analyses, etc. Since the Fukushima Daiichi accident happened, it is necessary to consider transients with multiple-failure. Base on the analysis, we further study the auxiliary feedwater capability for Loss-of-Normal-Feedwater (LONF) transient. LONF is the limiting transient of non-turbine trip initiated event for ATWS (Anticipated Transient Without Scram) which results in a reduction in capability of the secondary system to remove the heat generated in the reactor core. If the turbine fails to trip immediately, the secondary water inventory will decrease significantly before the actuation of auxiliary feedwater (AFW) system. The heat removal from the primary side decreases, and this leads to increases of primary coolant temperature and pressure. The water level of pressurizer also increases subsequently. The heat removal through the relief valves and the auxiliary feedwater is not sufficient to fully cope with the heat generation from primary side. The pressurizer will be filled with water finally, and the RCS pressure might rise above the set point of relief valves for water discharge. RCS pressure depends on steam generator inventory, primary coolant temperature, negative reactivity feedback, and core power, etc. The RCS pressure may reach its peak after core power reduction. According to ASME Code Level C service limit criteria, the Reactor Coolant System (RCS) pressure must be under 22.06 MPa. The USNRC is developing an advanced thermal hydraulic code named TRACE for nuclear power plant safety analysis. The development of TRACE is based on TRAC and integrating with RELAP5 and other programs. SNAP

  20. Basic information about development and construction of a PWR

    International Nuclear Information System (INIS)

    Meyer, P.J.

    1977-01-01

    1.0) Plant layout of a PWR; 2.0) principle design of a PWR and the reactor coolant system; 3.0) reactor auxiliary and ancillary systems; 3.1) volume control system; 3.2) boric acid control and chemical feeding system; 3.3) coolant purification and degassing system; 3.4) coolant storage and treatment system; 3.5) nuclear component cooling system; 3.6) liquid waste processing system; 3.7) gaseous waste processing system; 4.0) residual heat removal system; 5.0) emergency feedwater system; 6.0) containment design; 7.0) fuel handling, storage and transport system in a PWR. (orig.) [de

  1. Results of secondary side water regime modification in Nuclear Power Plant Paks

    International Nuclear Information System (INIS)

    Oesz, J.; Salamon, T.; Nagy, O.; Tilky, P.

    2001-01-01

    In order to extend the lifetime of Paks NPP, and for a possible power increase it is more and more evident that steam generators may be the limit. For the wear-out of the SG, it is decisive that at the end of the planned lifetime (after 25-30 reactor years) the number of plugged tubes should be as far as possible from the heat capacity limit. The modification of the secondary side water regime was started in 1997. It has been completed in the summer of year 2000, each of the four units has been operating using the new water regime. The results of this modification were evaluated on the basis of data obtained from six reactor years. The new water regime - after the overhaul check of the SG tubes - significantly decrease the number of tubes to plugged in the future. (R.P.)

  2. A study on the Stress Corrosion Cracking reduction method of Steam Generator secondary side of KSNP

    International Nuclear Information System (INIS)

    Kim, June Hoon; Lee, Goune Jin

    2014-01-01

    In order to avoid sludge accumulation affecting the life of the steam generator, the best way is to prevent the sludge inflow in advance by optimization of water quality management through chemical concentration and pH control etc. However it is very difficult to prevent sludge accumulation under the weak condition of corrosion, such as condensation, boiling and high temperature of feed-water in NPPs. Particularly stress corrosion cracking occurs in a top-of-tube sheet area of steam generator with an increase in number of operation years of Korea Standard Nuclear Plant(KSNP)... The purpose of this study is to improve suppression of stress corrosion cracking and life extension for steam generator and improve plant efficiency by performing full length bulk high chemical cleaning in order to remove iron oxide of steam generator secondary side in KSNP Hanbit Unit 6. This study analyzed the Free EDTA and Fe concentrations and sludge removal after performed full length bulk high temperature chemical cleaning for removing the iron oxide of steam generator secondary side, which of Hanbit unit 6 of KSNP. 1) It showed a typical pattern that Fe concentration increased in accordance with to decrease Free EDTA(Ethylene Diamine Tetea acetic Acid) concentration. 2) Sludge removal based on iron oxide after performing the full length bulk high temperature chemical cleaning was 3001kg and sludge removal by lancing additionally was 200.1kg

  3. Swing-Down of 21-PWR Waste Package

    International Nuclear Information System (INIS)

    A.K. Scheider

    2001-01-01

    The objective of this calculation is to determine the structural response of the waste package (WP) swinging down from a horizontally suspended height. The WP used for that purpose is the 21-Pressurized Water Reactor (PWR) WP. The scope of this document is limited to reporting the calculation results in terms of stress intensities. This calculation is associated with the WP design and was performed by the Waste Package Design group in accordance with the ''Technical Work Plan for: Waste Package Design Description for LA'' (Ref. 13). AP-3.12Q, ''Calculations'' (Ref. 18) is used to perform the calculation and develop the document. The information provided by the sketches attached to this calculation is that of the potential design of the type of 21-PWR WP design considered in this calculation and provides the potential dimensions and materials for the 21-PWR WP design

  4. PWR fuel performance and future trend in Japan

    International Nuclear Information System (INIS)

    Kondo, Y.

    1987-01-01

    Since the first PWR power plant Mihama Unit 1 initiated its commercial operation in 1970, Japanese utilities and manufacturers have expended much of their resources and efforts to improve PWR technology. The results are already seen in significantly improved performance of 16 PWR plants now in operation. Mitsubishi Heavy Industries Ltd. (MHI) has been supplying them with nuclear fuel assemblies, which are over 5700. As the reliability of the current design fuel has been achieved, the direction of R and D on nuclear fuel has changed to make nuclear power more competitive to the other power generation methods. The most important R and D targets are the burnup extension, Gd contained fuel, Pu utilizatoin and the load follow capacility. (author)

  5. Electrochemical measurements in PWR steam generators to follow crevice chemistry

    International Nuclear Information System (INIS)

    Feron, D.

    1991-01-01

    In PWR steam generator crevices, the evolution of chemistry is important for the understanding of corrosion phenomena. Electrochemical measurements have been performed in high temperature simulated crevice environments in order to follow hideout processes and remedial actions (on-line addition of boric acid). Reported tests have been conducted with model boilers of AJAX facilities. Eccentric and concentric tube support plate crevices have been instrumented with platinum electrodes. Electrochemical measurements have been collected when model boiler was under nominal conditions (primary temperature: 335 deg C, secondary temperature: 280 deg C). They include Electrochemical Impedance Spectroscopy (EIS) and potential measurements: with EIS, sodium and boric acid hideouts have been detected and followed. Potential measurements have been performed in an attempt to measure crevice PH evolution

  6. Scientific basis for the choice of primary/secondary water chemistry

    International Nuclear Information System (INIS)

    Garnsey, R.

    1988-01-01

    The purpose of this paper is to illustrate the common scientific basis for the chemistry control strategies which have been developed. The evolution of chemistry control philosophies in some plant designs are outlined as examples. The essential requirement of water chemistry control is to preserve integrity of the circuit under all the environmental conditions experienced within that circuit. There may be specific additional requirements, as in the case of a PWR primary circuit, where boron concentration is used to control reactivity. The crucial requirement or concern can vary. In the primary circuit of a light water reactor the crucial requirement is to supress the activation and transportation of corrosion products and so minimize radiation fields around the circuit. On the secondary side of recirculating steam generators the critical requirement has been to preserve the integrity of generator tubing. In once-through steam generators the critical requirement may be the control of pressure losses associated with corrosion product deposits in the steam generator and the integrity of the turbine in addition to boiler integrity. (Nogami, K.)

  7. Modeling PWR systems for monitoring primary-to-secondary leakage using tritium tracer

    International Nuclear Information System (INIS)

    Peiffer, D.G.

    1992-01-01

    This paper discusses several techniques available for monitoring primary to secondary leakage, focusing on the advantages and disadvantages of each. A mathematical model of Millstone 2 describes the behavior of tritium activity in the secondary plant water when a leak exists. Real data from Millstone 2 illustrate the accuracy and reliability of the model and use of the model to measure the mass of water in the secondary system

  8. Gadolinia experience and design for PWR fuel cycles

    International Nuclear Information System (INIS)

    Stephenson, L. C.

    2000-01-01

    The purpose of this paper is to describe Siemens Power Corporation's (SPC) current experience with the burnable absorber gadolinia in PWR fuel assemblies, including optimized features of SPC's PWR gadolinia designs, and comparisons with other burnable absorbers. Siemens is the world leader in PWR gadolinia experience. More than 5,900 Siemens PWR gadolinia-bearing fuel assemblies have been irradiated. The use of gadolinia-bearing fuel provides significant flexibility in fuel cycle designs, allows for low radial leakage fuel management and extended operating cycles, and reduces BOC (beginning-of-cycle) soluble boron concentrations. The optimized use of an integral burnable neutron absorber is a design feature which provides improved economic performance for PWR fuel assemblies. This paper includes a comparison between three different types of integral burnable absorbers: gadolinia, Zirconium diboride and erbia. Fuel cycle design studies performed by Siemens have shown that the enrichment requirements for 18-24 month fuel cycles utilizing gadolinia or zirconium diboride integral fuel burnable absorbers can be approximately the same. Although a typical gadolinia residual penalty for a cycle design of this length is as low as 0.02-0.03 wt% U-235, the design flexibility of gadolinia allows for very aggressive low-leakage core loading plans which reduces the enrichment requirements for gadolinia-bearing fuel. SPC has optimized its use of gadolinia in PWR fuel cycles. Typically, low (2-4) weight percent Gd 2 O 3 is used for beginning to middle of cycle reactivity hold down as well as soluble boron concentration holddown at BOC. Higher concentrations of Gd 2 O 3 , such as 6 and 8 wt%, are used to control power peaking in assemblies later in the cycle. SPC has developed core strategies that maximize the use of lower gadolinia concentrations which significantly reduces the gadolinia residual reactivity penalty. This optimization includes minimizing the number of rods with

  9. Sizewell: proposed site for Britain's first PWR power station

    International Nuclear Information System (INIS)

    1980-10-01

    The pamphlet covers the following points, very briefly: nuclear power - a success story; the Government's nuclear programme; why Sizewell; the PWR (with diagram); the PWR at Sizewell (with aerial view) (location; size; cooling water; road access; fuel transport; construction; employment; environment; screening; the next steps (licensing procedures, etc.); safety; further information). (U.K.)

  10. An economic analysis code used for PWR fuel cycle

    International Nuclear Information System (INIS)

    Liu Dingqin

    1989-01-01

    An economic analysis code used for PWR fuel cycle is developed. This economic code includes 12 subroutines representing vavious processes for entire PWR fuel cycle, and indicates the influence of the fuel cost on the cost of the electricity generation and the influence of individual process on the sensitivity of the fuel cycle cost

  11. Effects of Burnable Absorbers on PWR Spent Nuclear Fuel

    International Nuclear Information System (INIS)

    O'Leary, P.M.; Pitts, M.L.

    2000-01-01

    Burnup credit is an ongoing issue in designing and licensing transportation and storage casks for spent nuclear fuel (SNF). To address this issue, in July 1999, the U.S. Nuclear Regulatory Commission (NRC), Spent Fuel Project Office, issued Interim Staff Guidance-8 (ISG-8), Revision 1 allowing limited burnup credit for pressurized water reactor (PWR) spent nuclear fuel (SNF) to be used in transport and storage casks. However, one of the key limitations for a licensing basis analysis as stipulated in ISG-8, Revision 1 is that ''burnup credit is restricted to intact fuel assemblies that have not used burnable absorbers''. Because many PWR fuel designs have incorporated burnable-absorber rods for more than twenty years, this restriction places an unnecessary burden on the commercial nuclear power industry. This paper summarizes the effects of in-reactor irradiation on the isotopic inventory of PWR fuels containing different types of integral burnable absorbers (BAs). The work presented is illustrative and intended to represent typical magnitudes of the reactivity effects from depleting PWR fuel with different types of burnable absorbers

  12. Irradiation behavior of German PWR RPV steels under operating conditions

    Energy Technology Data Exchange (ETDEWEB)

    May, J.; Hein, H. [AREVA NP Gmbh (Germany); Ganswind, J. [VGB PowerTech e.V. (Germany); Widera, M. [RWE Power AG (Germany)

    2011-07-01

    In 2007, the last standard surveillance capsule of the original RPV (Reactor Pressure Vessel) surveillance programs of the 11 currently operating German PWR has been evaluated. With it the standard irradiation surveillance programs of these plants was completed. In the present paper, irradiation data of these surveillance programs will be presented and a final assessment of the irradiation behavior of the German PWR RPV steels with respect to current standards KTA 3203 and Reg. Guide 1.99 Rev. 2 will be given. Data from two units which are currently under decommissioning will also be included, so that data from all 13 German PWR manufactured by the former Siemens/KWU company (now AREVA NP GmbH) are shown. It will be shown that all surveillance data within the approved area of chemical composition verify the limit curve RT(limit) of the KTA 3203, which is the relevant safety standard for these plants. An analysis of the data shows, that the prediction formulas of Reg. Guide 1.99 Rev. 2 Pos. 1 or from the TTS model tend to overestimate the irradiation behavior of the German PWR RPV steels. Possible reasons for this behavior are discussed. Additionally, the data will be compared to data from the research project CARISMA to demonstrate that these data are representative for the irradiation behavior of the German PWR RPV steels. Since the data of these research projects cover a larger neutron fluence range than the original surveillance data, they offer a future outlook into the irradiation behavior of the German PWR RPV steels under long term conditions. In general, as a consequence of the relatively large and beneficial water gap between core and RPV, especially in all Siemens/KWU 4-loop PWR, the EOL neutron fluence and therefore the irradiation induced changes in mechanical properties of the German PWR RPV materials are rather low. Moreover the irradiation data indicate that the optimized RPV materials specifications that have been applied in particular for the

  13. Abnormal transient analysis by using PWR plant simulator, (2)

    International Nuclear Information System (INIS)

    Naitoh, Akira; Murakami, Yoshimitsu; Yokobayashi, Masao.

    1983-06-01

    This report describes results of abnormal transient analysis by using a PWR plant simulator. The simulator is based on an existing 822MWe power plant with 3 loops, and designed to cover wide range of plant operation from cold shutdown to full power at EOL. In the simulator, malfunctions are provided for abnormal conditions of equipment failures, and in this report, 17 malfunctions for secondary system and 4 malfunctions for nuclear instrumentation systems were simulated. The abnormal conditions are turbine and generator trip, failure of condenser, feedwater system and valve and detector failures of pressure and water level. Fathermore, failure of nuclear instrumentations are involved such as source range channel, intermediate range channel and audio counter. Transient behaviors caused by added malfunctions were reasonable and detail information of dynamic characteristics for turbine-condenser system were obtained. (author)

  14. PWR plant construction in Japan

    International Nuclear Information System (INIS)

    Tamura, Toshifumi

    2002-01-01

    The construction methods based on the experiences on the Nuclear Island, which is a critical path in the total construction schedule, have been studied and reconsidered in order to construct by more reliable and economical method. So various improved construction method are being applied and the duration of construction is being reduced continuously. So various improved construction method are being applied and the duration of construction is being reduced continuously. In this paper, the history of construction of twenty-three (23) PWR Plant, the actual construction methods and schedule of Ohi-3/4, to which the many improved methods were applied during their construction, are introduced mainly with the improved points for previously constructed plants. And also the situation of construction method for the next PWR Plant is simply explained

  15. Improved emergency elevated air release for simplified PWR

    International Nuclear Information System (INIS)

    Naitoh, T.; Bruce, R.A.; Hirota, K.; Tajiri, Y.

    1992-01-01

    In developing the application of the simplified PWR in Japan, one of the most important areas is to limit post-accident site boundary whole body dose. In addressing this, the concept of Emergency Passive Air Filtration System (EPAFS) and it's feasibility is developed. The efficiency of charcoal filtering and the atmospheric diffusion effect of an elevated air release are important for dose reduction. The performance of these functions was evaluated by confirmatory testing. The test results confirmed a 99 percent efficiency of charcoal filter and an atmospheric diffusion effect higher than that of a conventional plant. The Emergency Passive Air Filtration System (EPAFS) and the atmospheric diffusion effect of elevated air release contribute to making the calculated post-accident site boundary whole body dose of simplified PWR as low as that of the conventional Japanese PWR plant. (author)

  16. Containment fan cooler heat transfer calculation during main steam line break for Maanshan PWR plant

    Energy Technology Data Exchange (ETDEWEB)

    Yuann, Yng-Ruey, E-mail: ryyuann@iner.gov.tw; Kao, Lain-Su, E-mail: lskao@iner.gov.tw

    2013-10-15

    Highlights: • Evaluate component cooling water (CCW) thermal response during MSLB for Maanshan. • Using GOTHIC to calculate CCW temperature and determine time required to boil CCW. • Both convective and condensation heat transfer from the air side are considered. • Boiling will not occur since T{sub B} is sufficiently longer than CCW pump restart time. -- Abstract: A thermal analysis has been performed for the Containment Fan Cooler Unit (FCU) during Main Steam Line Break (MSLB) accident, concurrent with loss of offsite power, for Maanshan PWR plant. The analysis is performed in order to address the waterhammer and two-phase flow issues discussed in USNRC's Generic Letter 96-06 (GL 96-06). Maanshan plant is a twin-unit Westinghouse 3-loop PWR currently operated at rated core thermal power of 2822 MWt for each unit. The design basis for containment temperature is Main Steam Line Break (MSLB) accident at power of 2830.5 MWt, which results in peak vapor temperature of 387.6 °F. The design is such that when MSLB occurs concurrent with loss of offsite power (MSLB/LOOP), both the coolant pump on the secondary side and the fan on the air side of the FCU loose power and coast down. The pump has little inertia and coasts down in 2–3 s, while the FCU fan coasts down over much longer period. Before the pump is restored through emergency diesel generator, there is potential for boiling the coolant in the cooling coils by the high-temperature air/steam mixture entering the FCU. The time to boiling depends on the operating pressure of the coolant before the pump is restored. The prediction of the time to boiling is important because it determines whether there is potential for waterhammer or two-phase flow to occur before the pump is restored. If boiling occurs then there exists steam region in the pipe, which may cause the so called condensation induced waterhammer or column closure waterhammer. In either case, a great amount of effort has to be spent to

  17. The simulation research for the dynamic performance of integrated PWR

    International Nuclear Information System (INIS)

    Yuan Jiandong; Xia Guoqing; Fu Mingyu

    2005-01-01

    The mathematical model of the reactor core of integrated PWR has been studied and simplified properly. With the lumped parameter method, authors have established the mathematical model of the reactor core, including the neutron dynamic equation, the feedback reactivities model and the thermo-hydraulic model of the reactor. Based on the above equations and models, the incremental transfer functions of the reactor core model have been built. By simulation experimentation, authors have compared the dynamic characteristics of the integrated PWR with the traditional dispersed PWR. The simulation results show that the mathematical models and equations are correct. (authors)

  18. PWR core design calculations

    International Nuclear Information System (INIS)

    Trkov, A.; Ravnik, M.; Zeleznik, N.

    1992-01-01

    Functional description of the programme package Cord-2 for PWR core design calculations is presented. Programme package is briefly described. Use of the package and calculational procedures for typical core design problems are treated. Comparison of main results with experimental values is presented as part of the verification process. (author) [sl

  19. Road-map design for thorium-uranium breeding recycle in PWR - 031

    International Nuclear Information System (INIS)

    Shengyi, Si

    2010-01-01

    The paper was focused on designing a road-map to finally approach sustainable Thorium-Uranium ( 232 Th- 233 U) Breeding Recycle in current PWR, without any other change to the fuel lattice and the core internals, but substituting the UOX pellet with Thorium-based pellet. At first, the paper presented some insights to the inherence of Thorium-Uranium fuel conversion or breeding in PWR based on the neutronics theory and revealed the prerequisites for Thorium-Uranium fuel in PWR to achieve sustainable Breeding Recycle; And then, various Thorium-based fuels were designed and examined, and the calculation results further validated the above theoretical deductions; Based on the above theoretical analysis and calculation results, a road-map for sustainable Thorium-Uranium breeding recycle in PWR was outlined finally. (authors)

  20. Influence of boron reduction strategies on PWR accident management flexibility

    International Nuclear Information System (INIS)

    Papukchiev, Angel Aleksandrov; Liu, Yubo; Schaefer, Anselm

    2007-01-01

    In conventional pressurized water reactor (PWR) designs, soluble boron is used for reactivity control over core fuel cycle. Design changes to reduce boron concentration in the reactor coolant are of general interest regarding three aspects - improved reactivity feedback properties, lower impact of boron dilution scenarios on PWR safety and eventually more flexible accident management procedures. In order to assess the potential advantages through the introduction of boron reduction strategies in current PWRs, two low boron core configurations based on fuel with increased utilization of gadolinium and erbium burnable absorbers have been developed. The new PWR designs permit to reduce the natural boron concentration in reactor coolant at begin of cycle to 518 ppm and 805 ppm. For the assessment of the potential safety advantages of these cores a hypothetical beyond design basis accident has been simulated with the system code ATHLET. The analyses showed improved inherent safety and increased accident management flexibility of the low boron cores in comparison with the standard PWR. (author)

  1. Nondestructive examination requirements for PWR vessel internals

    International Nuclear Information System (INIS)

    Spanner, J.

    2015-01-01

    This paper describes the requirements for the nondestructive examination of pressurized water reactor (PWR) vessel internals in accordance with the requirements of the EPRI Material Reliability Program (MRP) inspection standard for PWR internals (MRP-228) and the American Society of Mechanical Engineers Section XI In-service Inspection. The MRP vessel internals examinations have been performed at nuclear plants in the USA since 2009. The objective of the inspection standard is to provide the requirements for the nondestructive examination (NDE) methods implemented to support the inspection and evaluation of the internals. The inspection standard contains requirements specific to the inspection methodologies involved as well as requirements for qualification of the NDE procedures, equipment and personnel used to perform the vessel internals inspections. The qualification requirements for the NDE systems will be summarized. Six PWR plants in the USA have completed inspections of their internals using the Inspection and Evaluation Guideline (MRP-227) and the Inspection Standard (MRP-228). Examination results show few instances of service-induced degradation flaws, as expected. The few instances of degradation have mostly occurred in bolting

  2. Fabrication of PWR fuel assembly and CANDU fuel bundle

    International Nuclear Information System (INIS)

    Lee, G.S.; Suh, K.S.; Chang, H.I.; Chung, S.H.

    1980-01-01

    For the project of localization of nuclear fuel fabrication, the R and D to establish the fabrication technology of CANDU fuel bundle as well as PWR fuel assembly was carried out. The suitable boss height and the prober Beryllium coating thickness to get good brazing condition of appendage were studied in the fabrication process of CANDU fuel rod. Basic Studies on CANLUB coating method also were performed. Problems in each fabrication process step and process flow between steps were reviewed and modified. The welding conditions for top and bottom nozzles, guide tube, seal and thimble screw pin were established in the fabrication processes of PWR fuel assembly. Additionally, some researches for a part of PWR grid brazing problems are also carried out

  3. Parameterized representation of macroscopic cross section for PWR reactor

    International Nuclear Information System (INIS)

    Fiel, João Cláudio Batista; Carvalho da Silva, Fernando; Senra Martinez, Aquilino; Leal, Luiz C.

    2015-01-01

    Highlights: • This work describes a parameterized representation of the homogenized macroscopic cross section for PWR reactor. • Parameterization enables a quick determination of problem-dependent cross-sections to be used in few group calculations. • This work allows generating group cross-section data to perform PWR core calculations without computer code calculations. - Abstract: The purpose of this work is to describe, by means of Chebyshev polynomials, a parameterized representation of the homogenized macroscopic cross section for PWR fuel element as a function of soluble boron concentration, moderator temperature, fuel temperature, moderator density and 235 92 U enrichment. The cross-section data analyzed are fission, scattering, total, transport, absorption and capture. The parameterization enables a quick and easy determination of problem-dependent cross-sections to be used in few group calculations. The methodology presented in this paper will allow generation of group cross-section data from stored polynomials to perform PWR core calculations without the need to generate them based on computer code calculations using standard steps. The results obtained by the proposed methodology when compared with results from the SCALE code calculations show very good agreement

  4. Development of Cost Estimation Methodology of Decommissioning for PWR

    International Nuclear Information System (INIS)

    Lee, Sang Il; Yoo, Yeon Jae; Lim, Yong Kyu; Chang, Hyeon Sik; Song, Geun Ho

    2013-01-01

    The permanent closure of nuclear power plant should be conducted with the strict laws and the profound planning including the cost and schedule estimation because the plant is very contaminated with the radioactivity. In Korea, there are two types of the nuclear power plant. One is the pressurized light water reactor (PWR) and the other is the pressurized heavy water reactor (PHWR) called as CANDU reactor. Also, the 50% of the operating nuclear power plant in Korea is the PWRs which were originally designed by CE (Combustion Engineering). There have been experiences about the decommissioning of Westinghouse type PWR, but are few experiences on that of CE type PWR. Therefore, the purpose of this paper is to develop the cost estimation methodology and evaluate technical level of decommissioning for the application to CE type PWR based on the system engineering technology. The aim of present study is to develop the cost estimation methodology of decommissioning for application to PWR. Through the study, the following conclusions are obtained: · Based on the system engineering, the decommissioning work can be classified as Set, Subset, Task, Subtask and Work cost units. · The Set and Task structure are grouped as 29 Sets and 15 Task s, respectively. · The final result shows the cost and project schedule for the project control and risk management. · The present results are preliminary and should be refined and improved based on the modeling and cost data reflecting available technology and current costs like labor and waste data

  5. The research on burnup characteristic of doping burnable poison in PWR

    International Nuclear Information System (INIS)

    Qiang Shenglong; Qin Dong; Chai Xiaoming; Yao Dong

    2014-01-01

    In PWR core design, burnable poisons are usually used for reactive compensation and power flatten. The choice of burnable poisons and how to match burnup would be the key-points for a long-life core design. We study the burnup character of doping burnable poisons (such as natural element, manual nuclide and soluble boron) in the PWR by the core burnup code MOI based on Monte Carlo method. The results show that Hf, Er and Eu doping burnable poison would be applicable for the nuclear design research on the long-life PWR core. (authors)

  6. Cylindrization of a PWR core for neutronic calculations

    International Nuclear Information System (INIS)

    Santos, Rubens Souza dos

    2005-01-01

    In this work we propose a core cylindrization, starting from a PWR core configuration, through the use of an algorithm that becomes the process automated in the program, independent of the discretization. This approach overcomes the problem stemmed from the use of the neutron transport theory on the core boundary, in addition with the singularities associated with the presence of corners on the outer fuel element core of, existents in the light water reactors (LWR). The algorithm was implemented in a computational program used to identification of the control rod drop accident in a typical PWR core. The results showed that the algorithm presented consistent results comparing with an production code, for a problem with uniform properties. In our conclusions, we suggest, for future works, for analyzing the effect on mesh sizes for the Cylindrical geometry, and to compare the transport theory calculations versus diffusion theory, for the boundary conditions with corners, for typical PWR cores. (author)

  7. Safety aspects of the using Gd as burnable poison in PWR's

    International Nuclear Information System (INIS)

    Vandenberg, C.; Bonet, H.; Charlier, A.

    1978-01-01

    The experience of BELGONUCLEAIRE in using Gd in LWR's has indicated the safety related advantages of this burnable poison. The successfully operation of the BR3 PWR power plant with 5% of Gd rods is presented and extrapolated to large PWR's. (authro)

  8. Processing method for chemical cleaning liquid on the secondary side of steam generator

    International Nuclear Information System (INIS)

    Nishihara, Yukio; Inagaki, Yuzo.

    1993-01-01

    Upon processing nitrilotriacetate (NTA), Fe liquid wastes mainly comprising Fe and Cu liquid wastes mainly comprising ethylene diamine and Cu generated upon chemical cleaning on the secondary side of a steam generator, pH of the Fe liquid wastes is lowered to deposit and separate NTA. Then, Fe ions in a filtrates are deposited on a cathode by electrolysis, as well as remaining NTA is decomposed by oxidation at an anode by O 2 gas. Cu liquid wastes are reacted with naphthalene disulfate and Ba ions and the reaction products are separated by deposition as sludges. Remaining Cu ions in the filtrates are deposited on the cathode by electrolysis. With such procedures, concentration of COD(NTA), Fe ions and Cu ions can greatly be reduced. Further, since capacity of the device can easily be increased in this method, a great amount of liquid wastes can be processed in a relatively short period of time. (T.M.)

  9. PWR steam generator chemical cleaning. Phase I: solvent and process development. Volume II

    International Nuclear Information System (INIS)

    Larrick, A.P.; Paasch, R.A.; Hall, T.M.; Schneidmiller, D.

    1979-01-01

    A program to demonstrate chemical cleaning methods for removing magnetite corrosion products from the annuli between steam generator tubes and the tube support plates in vertical U-tube steam generators is described. These corrosion products have caused steam generator tube ''denting'' and in some cases have caused tube failures and support plate cracking in several PWR generating plants. Laboratory studies were performed to develop a chemical cleaning solvent and application process for demonstration cleaning of the Indian Point Unit 2 steam generators. The chemical cleaning solvent and application process were successfully pilot-tested by cleaning the secondary side of one of the Indian Point Unit 1 steam generators. Although the Indian Point Unit 1 steam generators do not have a tube denting problem, the pilot test provided for testing of the solvent and process using much of the same equipment and facilities that would be used for the Indian Point Unit 2 demonstration cleaning. The chemical solvent selected for the pilot test was an inhibited 3% citric acid-3% ascorbic acid solution. The application process, injection into the steam generator through the boiler blowdown system and agitation by nitrogen sparging, was tested in a nuclear environment and with corrosion products formed during years of steam generator operation at power. The test demonstrated that the magnetite corrosion products in simulated tube-to-tube support plate annuli can be removed by chemical cleaning; that corrosion resulting from the cleaning is not excessive; and that steam generator cleaning can be accomplished with acceptable levels of radiation exposure to personnel

  10. On site PWR fuel inspection measurements for operational and design verification

    International Nuclear Information System (INIS)

    1996-01-01

    The on-site inspection of irradiated Pressurized Water Reactor (PWR) fuel and Non-Fuel Bearing Components (NFBC) is typically limited to visual inspections during refuelings using underwater TV cameras and is intended primarily to confirm whether the components will continue in operation. These inspections do not normally provide data for design verification nor information to benefit future fuel designs. Japanese PWR utilities and Nuclear Fuel Industries Ltd. designed, built, and performed demonstration tests of on-site inspection equipment that confirms operational readiness of PWR fuel and NFBC and also gathers data for design verification of these components. 4 figs, 3 tabs

  11. Representing Operational Knowledge of PWR Plant by Using Multilevel Flow Modelling

    DEFF Research Database (Denmark)

    Zhang, Xinxin; Lind, Morten; Jørgensen, Sten Bay

    2014-01-01

    situation and support operational decisions. This paper will provide a general MFM model of the primary side in a standard Westinghouse Pressurized Water Reactor ( PWR ) system including sub - systems of Reactor Coolant System, Rod Control System, Chemical and Volume Control System, emergency heat removal......The aim of this paper is to explore the capability of representing operational knowledge by using Multilevel Flow Modelling ( MFM ) methodology. The paper demonstrate s how the operational knowledge can be inserted into the MFM models and be used to evaluate the plant state, identify the current...... systems. And the sub - systems’ functions will be decomposed into sub - models according to different operational situations. An operational model will be developed based on the operating procedure by using MFM symbols and this model can be used to implement coordination rules for organize the utilizati...

  12. Pressurizer and steam-generator behavior under PWR transient conditions

    International Nuclear Information System (INIS)

    Wahba, A.B.; Berta, V.T.; Pointner, W.

    1983-01-01

    Experiments have been conducted in the Loss-of-Fluid Test (LOFT) pressurized water reactor (PWR), at the Idaho National Engineering Laboratory, in which transient phenomena arising from accident events with and without reactor scram were studied. The main purpose of the LOFT facility is to provide data for the development of computer codes for PWR transient analyses. Significant thermal-hydraulic differences have been observed between the measured and calculated results for those transients in which the pressurizer and steam generator strongly influence the dominant transient phenomena. Pressurizer and steam generator phenomena that occurred during four specific PWR transients in the LOFT facility are discussed. Two transients were accompanied by pressurizer inflow and a reduction of the heat transfer in the steam generator to a very small value. The other two transients were accompanied by pressurizer outflow while the steam generator behavior was controlled

  13. Proposal for a advanced PWR core with adequate characteristics for passive safety concept

    International Nuclear Information System (INIS)

    Perrotta, Jose Augusto

    1999-01-01

    This work presents a discussion upon the suitable from an advanced PWR core, classified by the EPRI as 'Passive PWR' (advanced reactor with passive safety concept to power plants with less than 600 MW electrical power). The discussion upon the type of core is based on nuclear fuel engineering concepts. Discussion is made on type of fuel materials, structural materials, geometric shapes and manufacturing process that are suitable to produce fuel assemblies which give good performance for this type of reactors. The analysis is guided by the EPRI requirements for Advanced Light Water Reactor (ALWR). By means of comparison, the analysis were done to Angra 1 (old type of 600 MWe PWR class), and the design of the Westinghouse Advanced PWR-AP600. It was verified as a conclusion of this work that the modern PWR fuels are suitable for advanced PWR's Nevertheless, this work presents a technical alternative to this kind of fuel, still using UO 2 as fuel, but changing its cylindrical form of pellets and pin type fuel element to plane shape pallets and plate type fuel element. This is not a novelty fuel, since it was used in the 50's at Shippingport Reactor and as an advanced version by CEA of France in the 70's. In this work it is proposed a new mechanical assembly design for this fuel, which can give adequate safety and operational performance to the core of a 'Passive PWR'. (author)

  14. Evolutionary developments of advanced PWR nuclear fuels and cladding materials

    International Nuclear Information System (INIS)

    Kim, Kyu-Tae

    2013-01-01

    Highlights: • PWR fuel and cladding materials development processes are provided. • Evolution of PWR advanced fuel in U.S.A. and in Korea is described. • Cutting-edge design features against grid-to-rod fretting and debris are explained. • High performance data of advanced grids, debris filters and claddings are given. -- Abstract: The evolutionary developments of advanced PWR fuels and cladding materials are explained with outstanding design features of nuclear fuel assembly components and zirconium-base cladding materials. The advanced PWR fuel and cladding materials development processes are also provided along with verification tests, which can be used as guidelines for newcomers planning to develop an advanced fuel for the first time. The up-to-date advanced fuels with the advanced cladding materials may provide a high level of economic utilization and reliable performance even under current and upcoming aggressive operating conditions. To be specific, nuclear fuel vendors may achieve high fuel burnup capability of between 45,000 and 65,000 MWD/MTU batch average, overpower thermal margin of as much as 15% and longer cycle length up to 24 months on the one hand and fuel failure rates of around 10 −6 on the other hand. However, there is still a need for better understanding of grid-to-rod fretting wear mechanisms leading to major PWR fuel defects in the world and subsequently a driving force for developing innovative spacer grid designs with zero fretting wear-induced fuel failure

  15. The integrated PWR

    International Nuclear Information System (INIS)

    Gautier, G.M.

    2002-01-01

    This document presents the integrated reactors concepts by a presentation of four reactors: PIUS, SIR, IRIS and CAREM. The core conception, the operating, the safety, the economical aspects and the possible users are detailed. From the performance of the classical integrated PWR, the necessity of new innovative fuels utilization, the research of a simplified design to make easier the safety and the KWh cost decrease, a new integrated reactor is presented: SCAR 600. (A.L.B.)

  16. The PWR integrated leak rate test, a review of experiences and results

    International Nuclear Information System (INIS)

    Keogh, P.

    1985-01-01

    The paper reviews the Integrated Leak Rate Test (ILRT) as it has been carried out in the USA and as reported in papers in European countries. The test procedures are critically appraised and recommendations are given for modifications to them. The values used in a PWR are identified as a main source of leaks and possibilities for improvement are discussed. The use of a part pressure test and its limitations are considered. A part pressure test cannot give the same assurance as a full pressure test but may be useful for the identification of gross leaks. Secondary effects such as weather and the use of Van de Waals equations are considered and are found to be not important for concrete containments. (orig.)

  17. Advanced ion exchange resins for PWR condensate polishing

    International Nuclear Information System (INIS)

    Hoffman, B.; Tsuzuki, S.

    2002-01-01

    The severe chemical and mechanical requirements of a pressurized water reactor (PWR) condensate polishing plant (CPP) present a major challenge to the design of ion exchange resins. This paper describes the development and initial operating experience of improved cation and anion exchange resins that were specifically designed to meet PWR CPP needs. Although this paper focuses specifically on the ion exchange resins and their role in plant performance, it is also recognized and acknowledged that excellent mechanical design and operation of the CPP system are equally essential to obtaining good results. (authors)

  18. Two optimal control methods for PWR core control

    International Nuclear Information System (INIS)

    Karppinen, J.; Blomsnes, B.; Versluis, R.M.

    1976-01-01

    The Multistage Mathematical Programming (MMP) and State Variable Feedback (SVF) methods for PWR core control are presented in this paper. The MMP method is primarily intended for optimization of the core behaviour with respect to xenon induced power distribution effects in load cycle operation. The SVF method is most suited for xenon oscillation damping in situations where the core load is unpredictable or expected to stay constant. Results from simulation studies in which the two methods have been applied for control of simple PWR core models are presented. (orig./RW) [de

  19. Transient performance of flow in PWR reactor circuits

    International Nuclear Information System (INIS)

    Hirdes, V.R.T.R.; Carajilescov, P.

    1988-12-01

    Generally, PWR's are designed with several primary loops, each one provided with a pump to circulate the coolant through the core. If one or more of these pumps fail, there would be a decrease in reactor flow rate which cause coolant phase change in the core and components overheating. The present work establishes a simulation model for pump failure in PWR's and the SARDAN-FLOW computes code was developed, considering any combination of such failures. Based on the data of Angra I, several accident and operational transient conditions were simulated. (author) [pt

  20. Babcock and Wilcox advanced PWR development

    International Nuclear Information System (INIS)

    Kulynych, G.E.; Lemon, J.E.

    1986-01-01

    The Babcock and Wilcox 600 MWe PWR design is discussed. Main features of the new B-600 design are improvements in reactor system configuration, glandless coolant pumps, safety features, core design and steam generators

  1. RSK-guidelines for PWR reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The RSK guidelines for PWA reactors of April 24, 1974, have been revised and amended in this edition. The RSK presents a summary of safety requirements to be observed in the design, construction, and operation of PWR reactors in the form of guidelines. From January 1979 onwards these guidelines will be the basis of siting and safety considerations for new PWR reactors, and newly built nuclear power plants will have to form these guidelines. They are not binding for existing nuclear power plants under construction or in operation. It will be a matter of individual discussion whether or not the guidelines will be applied in these plants. The main purpose of the guidelines is to facilitate discussion among RSK members and to give early information on necessary safety requirements. If the guidelines are observed by producers and operators, the RSK will make statements on individual projects at short notice. (orig./HP) [de

  2. Fuel management optimization for a PWR

    International Nuclear Information System (INIS)

    Dumas, M.; Robeau, D.

    1981-04-01

    This study is aimed to optimize the refueling pattern of a PWR. Two methods are developed, they are based on a linearized form of the optimization problem. The first method determines a feasible solution in two steps; in the first one the original problem is replaced by a relaxed one which is solved by the Method of Approximation Programming. The second step is based on the Branch and Bound method to find the feasible solution closest to the solution obtained in the first step. The second method starts from a given refueling pattern and tries to improve this pattern by the calculation of the effects of 2 by 2, 3 by 3 and 4 by 4 permutations on the objective function. Numerical results are given for a typical PWR refueling using the two methods

  3. Flow Accelerated Erosion-Corrosion (FAC) considerations for secondary side piping in the AP1000{sup R} nuclear power plant design

    Energy Technology Data Exchange (ETDEWEB)

    Vanderhoff, J. F.; Rao, G. V. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States); Stein, A. [Shaw Power Nuclear, 1000 Technology Center Drive, Stoughton, MA 02072 (United States)

    2012-07-01

    The issue of Flow Accelerated Erosion-Corrosion (FAC) in power plant piping is a known phenomenon that has resulted in material replacements and plant accidents in operating power plants. Therefore, it is important for FAC resistance to be considered in the design of new nuclear power plants. This paper describes the design considerations related to FAC that were used to develop a safe and robust AP1000{sup R} plant secondary side piping design. The primary FAC influencing factors include: - Fluid Temperature - Pipe Geometry/layout - Fluid Chemistry - Fluid Velocity - Pipe Material Composition - Moisture Content (in steam lines) Due to the unknowns related to the relative impact of the influencing factors and the complexities of the interactions between these factors, it is difficult to accurately predict the expected wear rate in a given piping segment in a new plant. This paper provides: - a description of FAC and the factors that influence the FAC degradation rate, - an assessment of the level of FAC resistance of AP1000{sup R} secondary side system piping, - an explanation of options to increase FAC resistance and associated benefits/cost, - discussion of development of a tool for predicting FAC degradation rate in new nuclear power plants. (authors)

  4. Side-by-side comparison of analytical techniques; organic acids, total organic carbon, and anions in PWR secondary cycles

    International Nuclear Information System (INIS)

    Hobart, S.A.; Byers, W.A.; Miller, M.R.; Richards, J.; Silva, H.; Palino, G.F.; Wall, P.S.

    1986-01-01

    Total Organic Carbon TOC samples should be analyzed no later than one week after they are taken and they should be stored in a refrigerated condition, if at all possible. It can be inferred that for TOC levels in the range of 50 to 120 ppb, state-of-the-art sampling and analysis techniques can produce results varying by 20 to 50 ppb. Any proposed limits for TOC should be reviewed in that light. Agreement between anion results appeared to improve over the course of the project. Both contractors agree that increased attention and care with sampling and analytical techniques probably accounted for this improvement. Utility personnel can therefore conclude that proper employee training, supervision, and motivation for proper sampling and analysis are critical if accurate anion results are to be obtained. Resonable agreement between calculated and measured values of cation conductivity suggest that both contractors had accurately determined all major anionic species

  5. EPRI PWR primary water chemistry guidelines revision

    International Nuclear Information System (INIS)

    McElrath, Joel; Fruzzetti, Keith

    2014-01-01

    EPRI periodically updates the PWR Primary Water Chemistry Guidelines as new information becomes available and as required by NEI 97-06 (Steam Generator Program Guidelines) and NEI 03-08 (Guideline for the Management of Materials Issues). The last revision of the PWR water chemistry guidelines identified an optimum primary water chemistry program based on then-current understanding of research and field information. This new revision provides further details with regard to primary water stress corrosion cracking (PWSCC), fuel integrity, and shutdown dose rates. A committee of industry experts, including utility specialists, nuclear steam supply system (NSSS) and fuel vendor representatives, Institute of Nuclear Power Operations (INPO) representatives, consultants, and EPRI staff collaborated in reviewing the available data on primary water chemistry, reactor water coolant system materials issues, fuel integrity and performance issues, and radiation dose rate issues. From the data, the committee updated the water chemistry guidelines that all PWR nuclear plants should adopt. The committee revised guidance with regard to optimization to reflect industry experience gained since the publication of Revision 6. Among the changes, the technical information regarding the impact of zinc injection on PWSCC initiation and dose rate reduction has been updated to reflect the current level of knowledge within the industry. Similarly, industry experience with elevated lithium concentrations with regard to fuel performance and radiation dose rates has been updated to reflect data collected to date. Recognizing that each nuclear plant owner has a unique set of design, operating, and corporate concerns, the guidelines committee has retained a method for plant-specific optimization. Revision 7 of the Pressurized Water Reactor Primary Water Chemistry Guidelines provides guidance for PWR primary systems of all manufacture and design. The guidelines continue to emphasize plant

  6. Thermal-hydraulic models for use in simplified reactivity calculations under secondary break conditions

    International Nuclear Information System (INIS)

    Wagner, S.G.; Harris, K.P.; Mansur, J.M.

    1981-01-01

    PWR accident analyses for breaks in the secondary system are characterized by extreme cooling of the core, large inlet temperature gradients, asymmetric stuck control rods and primary coolant flow predictions ranging from a few percent of nominal to full flow. For several years Combustion Engineering has been using the Hermite code to compute reacitvities, power distributions and flow distributions in 3-D for far off nominal thermal-hydraulic and neutronic conditions. These 3-D methods, while costly, have been very successful in analyzing a large class of PWR secondary break accidents. They indicate a much reduced post-scram return-to-power compared to less detailed, bounding core average feedback methods. The availability of a growing number of 3-D calculations has made it possible to develop and benchmark faster running of 2-D methods which account for many of the same effects seen in 3-D. Two such methods are described and evaluated in this paper and one method is shown to be realiable over a wide range of conditions. (orig.) [de

  7. Effects of microstructure and mechanical properties of alloys 600 an 690 on secondary side SCC

    International Nuclear Information System (INIS)

    Vaillant, F.; Buisine, D.; Prieux, B.; Fournel, J.C.; Gelpi, A.

    1996-03-01

    Modeling for secondary side cracking is needed to understand the behaviour of alloy 600 in plants. They require a comprehensive understanding of the various influences of the material properties on Stress Corrosion Cracking (SCC), based on field experience and laboratory data. In an attempt to predict the materials effects on SCC behaviour of new steam generators, laboratory corrosion data of alloy 690 were overviewed. French field experience with steam generators equipped with drilled tube support plates (TSPs) has demonstrated that the lower the yield stress (YS) and the carbon content, the higher the susceptibility t secondary side cracking of mill-annealed (MA) alloy 600. Also heat treated (700 deg. C x 16 h) tubing has been shown to have a much better resistance, but this excellent resistance could not be attributed only to the material properties. In laboratory environments, particularly in caustics, results have confirmed several of the above mentioned key findings on alloy 600: in caustic environments and under constant loading, tubes fabricated from MA alloy 600 with low YS have exhibited the worst resistance to initiation; YS was found to be the most accurate parameter to account for the behaviour of MA alloy 600. A heat treatment at 700 deg. C appeared to reduce the propagation rates of cracks in alloy 600. The best IGSCC resistance of alloy 690 was obtained for tubes with intergranular precipitation of carbides. TT (700 deg. C) significantly improved the propagation resistance of alloy 690; in acidic and neutral sulfate environments, IGSCC of alloy 600 was not strongly dependent on the microstructure in the MA condition, but sensitization was detrimental. When alloy 600 and particularly alloy 690 were thermally treated at 700 deg. C x 16 h, the resistance to IGSCC was significantly improved. Tests performed on alloy 690 have shown a better resistance to IGSCC initiation and propagation than alloy 600, in NaOH and acidic sulfate environments. (authors

  8. Conceptual design of simplified PWR

    International Nuclear Information System (INIS)

    Tabata, Hiroaki

    1996-01-01

    The limited availability for location of nuclear power plant in Japan makes plants with higher power ratings more desirable. Having no intention of constructing medium-sized plants as a next generation standard plant, Japanese utilities are interested in applying passive technologies to large ones. So, Japanese utilities have studied large passive plants based on AP600 and SBWR as alternative future LWRs. In a joint effort to develop a new generation nuclear power plant which is more friendly to operator and maintenance personnel and is economically competitive with alternative sources of power generation, JAPC and Japanese Utilities started the study to modify AP600 and SBWR, in order to accommodate the Japanese requirements. During a six year program up to 1994, basic concepts for 1000 MWe class Simplified PWR (SPWR) and Simplified BWR (SBWR) were developed, though there still remain several areas to be improved. These studies have now stepped into the phase of reducing construction cost and searching for maximum power rating that can be attained by reasonably practical technology. These results also suggest that it is hopeful to develop a large 3-loop passive plant (∼1200 MWe). Since Korea mainly deals with PWR, this paper summarizes SPWR study. The SPWR is jointly studied by JAPC, Japanese PWR Utilities, EdF, WH and Mitsubishi Heavy Industry. Using the AP-600 reference design as a basis, we enlarged the plant size to 3-loops and added engineering features to conform with Japanese practice and Utilities' preference. The SPWR program definitively confirmed the feasibility of a passive plant with an NSSS rating about 1000 MWe and 3 loops. (J.P.N.)

  9. Advanced inspection and repair techniques for primary side components

    International Nuclear Information System (INIS)

    Elm, Ralph

    1998-01-01

    The availability of nuclear power plant mainly depends on the components of the Nuclear Steam Supply System (NSSS) such as reactor pressure vessel, core internals and steam generators. The last decade has been characterized by intensive inspection and repair work on PWR steam generators. In the future, it can be expected, that the inspection of the reactor pressure vessel and the inspection and repair of its internals, in both PWR and BWR will be one of the challenges for the nuclear community. Due to this challenge, new, advanced inspection and repair techniques for the vital primary side components have been developed and applied, taking into account such issues as: use of reliable and fast inspection methods, repair of affected components instead of costly replacement, reduction of outage time compared to conventional methods, minimized radiation exposure, acceptable costs. This paper reflects on advanced inspection and repair techniques such as: Baffle Former Bolt inspection and replacement, Barrel Former Bolt inspection and replacement, Mechanized UT and visual inspection of reactor pressure vessels, Steam Generator repair by advanced sleeving technology. The techniques described have been successfully applied in nuclear power plants and improved the operation performance of the components and the NPP. (author). 6 figs

  10. Development of Program Evaluating the Effects on the Secondary Side of Steam Generator due to Foreign Objects

    International Nuclear Information System (INIS)

    Ju, Yoo Hyun; Nam, Choi Sung

    2005-01-01

    When materials such as metal are into the secondary side of steam generator, they, so called foreign objects, may have influences on the integrity of the steam generator tubes. They cause the tube wear due to the relative motion between the tubes and foreign objects and the tube impact due to flow. The best way to avoid the effects is to remove all the foreign objects. However, it is not easy to remove the foreign materials thoroughly due to their condition such as the location. If the locations of the foreign materials are in the middle of tube bundle and the tube arrangement of the steam generator is the triangle type, the equipment such as FOSAR(Foreign Object Search and Retrieval) can not reach their locations. If the foreign materials stick together with the tubes or tube sheet, they can not be removed. In the case of operating the steam generator with the foreign materials, the licensee must prove that the materials do not affect the tube integrity and do not threaten the pressure boundary with the analytical method. Considering the wear and impact by the foreign materials, KEPRI(Korea Electric Power Research Institute) developed the methodology to evaluate the foreign materials analytically. This methodology was described with a computer program in order to obtain the fast results. The program informs whether the tubes have the structural integrity when the foreign material strikes the tubes. Moreover, this gives us the remaining life of the steam generator tubes. In this paper, the program, which evaluates the effects of the foreign objects in the secondary side of steam generator, is introduced

  11. The latest full-scale PWR simulator in Japan

    International Nuclear Information System (INIS)

    Nishimuru, Y.; Tagi, H.; Nakabayashi, T.

    2004-01-01

    The latest MHI Full-scale Simulator has an excellent system configuration, in both flexibility and extendability, and has highly sophisticated performance in PWR simulation by the adoption of CANAC-II and PRETTY codes. It also has an instructive character to display the plant's internal status, such as RCS condition, through animation. Further, the simulation has been verified to meet a functional examination at model plant, and with a scale model test result in a two-phase flow event, after evaluation for its accuracy. Thus, the Simulator can be devoted to a sophisticated and broad training course on PWR operation. (author)

  12. PHEDRE model for the simulation of PWR reactors

    International Nuclear Information System (INIS)

    Bernard, Patrice; Dupraz, Remy; Vasile, Alfredo.

    1979-11-01

    This note presents the model of PHEDRE, simulator of a PWR, set on the hybrid computers of CISI, at the Nuclear Research Center of Cadarache. The model mainly concerns the primary part and the steam production of the PWR constructed in France. It includes an axial modelization of the core, the pressurizer, two loops of steam production and the inlet of the turbine, and the regulations concerning these components. The note presents the equations of the model, the structures of the codes concerning the initialization and the dynamic resolution, and describes the control panel of PHEDRE [fr

  13. Model for transient simulation in a PWR steam circuit

    International Nuclear Information System (INIS)

    Mello, L.A. de.

    1982-11-01

    A computer code (SURF) was developed and used to simulate pressure losses along the tubes of the main steam circuit of a PWR nuclear power plant, and the steam flow through relief and safety valves when pressure reactors its thresholds values. A thermodynamic model of turbines (high and low pressure), and its associated components are simulated too. The SURF computer code was coupled to the GEVAP computer code, complementing the simulation of a PWR nuclear power plant main steam circuit. (Author) [pt

  14. GO evaluation of a PWR spray system. Final report

    International Nuclear Information System (INIS)

    Long, W.T.

    1975-08-01

    GO is a reliability analysis methodology developed over the years from 1960 to the present by Kaman Sciences Corporation, Colorado Springs, Colorado. In this report the GO methodology is presented and its application demonstrated by performing a reliability analysis of a conceptual PWR Containment Spray System. Certain numerical results obtained are compared with those of a prior fault tree analysis of the same system as documented in the 11 January 1973 draft report, A Fault Tree Evaluation of a PWR Spray System

  15. Assessment of PWR Steam Generator modelling in RELAP5/MOD2

    International Nuclear Information System (INIS)

    Putney, J.M.; Preece, R.J.

    1993-06-01

    An assessment of Steam Generator (SG) modelling in the PWR thermal-hydraulic code RELAP5/MOD2 is presented. The assessment is based on a review of code assessment calculations performed in the UK and elsewhere, detailed calculations against a series of commissioning tests carried out on the Wolf Creek PWR and analytical investigations of the phenomena involved in normal and abnormal SG operation. A number of modelling deficiencies are identified and their implications for PWR safety analysis are discussed -- including methods for compensating for the deficiencies through changes to the input deck. Consideration is also given as to whether the deficiencies will still be present in the successor code RELAP5/MOD3

  16. VALIDATION OF SIMBAT-PWR USING STANDARD CODE OF COBRA-EN ON REACTOR TRANSIENT CONDITION

    Directory of Open Access Journals (Sweden)

    Muhammad Darwis Isnaini

    2016-03-01

    Full Text Available The validation of Pressurized Water Reactor typed Nuclear Power Plant simulator developed by BATAN (SIMBAT-PWR using standard code of COBRA-EN on reactor transient condition has been done. The development of SIMBAT-PWR has accomplished several neutronics and thermal-hydraulic calculation modules. Therefore, the validation of the simulator is needed, especially in transient reactor operation condition. The research purpose is for characterizing the thermal-hydraulic parameters of PWR1000 core, which be able to be applied or as a comparison in developing the SIMBAT-PWR. The validation involves the calculation of the thermal-hydraulic parameters using COBRA-EN code. Furthermore, the calculation schemes are based on COBRA-EN with fixed material properties and dynamic properties that calculated by MATPRO subroutine (COBRA-EN+MATPRO for reactor condition of startup, power rise and power fluctuation from nominal to over power. The comparison of the temperature distribution at nominal 100% power shows that the fuel centerline temperature calculated by SIMBAT-PWR has 8.76% higher result than COBRA-EN result and 7.70% lower result than COBRA-EN+MATPRO. In general, SIMBAT-PWR calculation results on fuel temperature distribution are mostly between COBRA-EN and COBRA-EN+MATPRO results. The deviations of the fuel centerline, fuel surface, inner and outer cladding as well as coolant bulk temperature in the SIMBAT-PWR and the COBRA-EN calculation, are due to the value difference of the gap heat transfer coefficient and the cladding thermal conductivity.

  17. Predicted wear on the tube outside surface due to foreign object in the secondary side of steam generator

    International Nuclear Information System (INIS)

    Kim, Hyung Nam; Cho, Nam Cheoul

    2012-01-01

    It is necessary to evaluate the effects of foreign objects on steam generator tubes and to use this information to take appropriate safety precautions to prevent nuclear accidents. Foreign objects may include loose parts from the feed water system and items lost by workers during o/h, and may flow into the secondary side of steam generators during operation. A foreign object could damage steam generator tube walls if there is relative motion between the tube and the foreign object. This is especially true for foreign objects that land on the tube sheet because the velocity of cross flow, which creates a contact force between the tube and foreign object, is relatively high there. During steam generator overhauls, foreign objects are detected by non destructive methods such as the visual test and/or the eddy current test. Confirmed foreign objects should be removed for nuclear safety. The Foreign Object Search and Retrieval System (FOSAR) can be used to remove foreign objects from the steam generators with a square tube array. However, the FOSAR cannot be used (or can be used in only a very restricted area, such as the outside of the tube bundle) in the steam generators with a triangular tube array. In order to continue nuclear power plant operations without removing foreign objects, the integrity of the steam generator tube must be verified. This paper introduces a practical method developed to evaluate the effects of foreign objects detected on tube sheets in the secondary sides of steam generators

  18. Characterization and dissolution studies of Bruce Unit 3 steam generator secondary side deposits

    International Nuclear Information System (INIS)

    Semmler, J.

    1998-01-01

    The physical and chemical properties of secondary side steam generator deposits in the form of powder and flake obtained from Bruce Nuclear Generating Station A (BNGS A) Unit 3 were studied. The chemical phases present in both types of deposits, collected prior to the 1994 chemical cleaning during the pre-clean water lancing campaign, were magnetite (Fe 3 O 4 ), metallic copper (Cu), hematite (Fe 2 O 3 ) and cuprous oxide (Cu 2 O). The major difference between the chemical composition of the powder and the flake was the presence of zinc silicate (Zn 2 SiO 4 ) and several unidentified silicate phases containing Ca, Al, Mn, and Mg in the flake. The flake deposit had high hardness values, high electrical resistivity, low porosity and a lower dissolution rate in the EPRI-SGOG (Electric Power Research Institute-Steam Generator Owner's Group) chemical cleaning solvents compared to the powder deposit. Differences in the deposit properties after chemical cleaning of the Unit 3 steam generators and after laboratory cleaning were noted. The presence of silicates in the deposit inhibit magnetite dissolution

  19. Heat transfer system

    International Nuclear Information System (INIS)

    Meininger, S.; Kaffine, H.W.; Kleinschroth, K.H.

    1984-01-01

    The radiolysis products N13 and F18 are monitored on the secondary side for monitoring steam-raising unit leaks of a PWR. An (organic) ion exchange filter designed for a large flow surrounds the steam/water circuit in the condensate pipe to shield a scintillation counter against interference radiation. (HP) [de

  20. Plutonium recycling in PWR

    International Nuclear Information System (INIS)

    Youinou, G.; Girieud, R.; Guigon, B.

    2000-01-01

    Two concepts of 100% MOX PWR cores are presented. They are designed such as to minimize the consequences of the introduction of Pu on the core control. The first one has a high moderation ratio and the second one utilizes an enriched uranium support. The important design parameters as well as their capabilities to multi recycle Pu are discussed. We conclude with the potential interest of the two concepts. (author)

  1. SCALE6 Hybrid Deterministic-Stochastic Shielding Methodology for PWR Containment Calculations

    International Nuclear Information System (INIS)

    Matijevic, Mario; Pevec, Dubravko; Trontl, Kresimir

    2014-01-01

    The capabilities and limitations of SCALE6/MAVRIC hybrid deterministic-stochastic shielding methodology (CADIS and FW-CADIS) are demonstrated when applied to a realistic deep penetration Monte Carlo (MC) shielding problem of full-scale PWR containment model. The ultimate goal of such automatic variance reduction (VR) techniques is to achieve acceptable precision for the MC simulation in reasonable time by preparation of phase-space VR parameters via deterministic transport theory methods (discrete ordinates SN) by generating space-energy mesh-based adjoint function distribution. The hybrid methodology generates VR parameters that work in tandem (biased source distribution and importance map) in automated fashion which is paramount step for MC simulation of complex models with fairly uniform mesh tally uncertainties. The aim in this paper was determination of neutron-gamma dose rate distribution (radiation field) over large portions of PWR containment phase-space with uniform MC uncertainties. The sources of ionizing radiation included fission neutrons and gammas (reactor core) and gammas from activated two-loop coolant. Special attention was given to focused adjoint source definition which gave improved MC statistics in selected materials and/or regions of complex model. We investigated benefits and differences of FW-CADIS over CADIS and manual (i.e. analog) MC simulation of particle transport. Computer memory consumption by deterministic part of hybrid methodology represents main obstacle when using meshes with millions of cells together with high SN/PN parameters, so optimization of control and numerical parameters of deterministic module plays important role for computer memory management. We investigated the possibility of using deterministic module (memory intense) with broad group library v7 2 7n19g opposed to fine group library v7 2 00n47g used with MC module to fully take effect of low energy particle transport and secondary gamma emission. Compared with

  2. Reduction of residual stresses in internal skin of transient zones of PWR steam generator expanded tubes: tests with a ''rotating brush''

    International Nuclear Information System (INIS)

    Vidal, P.

    1984-04-01

    A process aiming at preventing or suppressing cracks under stress corrosion on the primary side in the expanded zones of PWR steam generator tubes has been studied; it consists in hammering the internal skin of tubes in these zones what reduces the level of residual expanding stresses to lower values around 100-150 MPa without modifying the stress level in external skin. Tests in magnesium chloride to estimate the residual stresses of tubes in low carbon stainless austenitic steel 18% Cr-12% Ni with molybdene [fr

  3. Wear on Plugged Tube due to the Foreign Objects on the Secondary Side of Steam Generator

    International Nuclear Information System (INIS)

    Kim, Hyung Nam; Cho, Nam Cheoul; Nam, Min Woo

    2013-01-01

    In this paper, the changes of the tube frequency and amplitude are introduced before and after plugging. The amplitude of the bottom span for the steam generator tube is not much changed after tube plugging. Moreover, the contact force between the plugged tube and the foreign object is the same as that of intact tube and the foreign object. However, the frequencies of plugged tubes are about 9∼12% higher than those of intact tubes. That means the wear due to the foreign object would be accelerated after the tube plugging. Therefore, the tube stabilizer should be installed when the tube is plugged due to the foreign object wear. The tube wall of steam generator is a pressure boundary between the coolant of the primary system and the feedwater of the secondary system. It is very important to insure the structural integrity of the tubes because the radioactive coolant is flow into the feedwater due to the pressure difference as the result of tube failure. The degradations of steam generator tubes are corrosion, wear, fatigue and foreign object wear, etc. The foreign object wear is one of mechanical degradation due to materials flew into the secondary side of steam generator. The steam generator tubes, estimated not to insure structural integrity from the results of the nondestructive evaluation such as eddy current test and visual inspection, are excluded from the service with plugging. However, the tube wear is still being progressed after the plugging because the relative motion between the tube and structure is still existed due to the secondary side flow in the steam generator. If the tube is completely cut because of the degradation, the tube can be a stress or of failure of tubes around the plugged tube. The contact force between the structure and tube is lowered as the wear is progressed. However, the contact force between the foreign object and tube is not changed as the wear is progressed. Therefore, the structural integrity of tubes around the foreign

  4. The PWR spectral code GELS. Pt. 1

    International Nuclear Information System (INIS)

    Penndorf, K.; Schult, F.; Schulz, G.

    1976-01-01

    The code procedures group constant libraries for the static PWR design of whatever fuel cycle - Uranium, Thorium, or Plutonium. The whole reach of temperatures is covered and the treatment of strong lumped absorbers as control or burnable poison pins is included. The main features are: 1) Good accuracy in spite of not fitting the material data to critical experiments; 2) speed and relatively low computer equipment; 3) restriction to PWR's only. In case of demands for higher accuracy there is a further restriction concerning the library data of the epithermal resonance absorbers: They are strictly valid only for several special lattice geometrics. Three samples are given each representing a typical application of the code. Two of them likewise are demonstrations of recalculated experiments. (orig.) [de

  5. Optimization of reload core design for PWR

    International Nuclear Information System (INIS)

    Shen Wei; Xie Zhongsheng; Yin Banghua

    1995-01-01

    A direct efficient optimization technique has been effected for automatically optimizing the reload of PWR. The objective functions include: maximization of end-of-cycle (EOC) reactivity and maximization of average discharge burnup. The fuel loading optimization and burnable poison (BP) optimization are separated into two stages by using Haling principle. In the first stage, the optimum fuel reloading pattern without BP is determined by the linear programming method using enrichments as control variable, while in the second stage the optimum BP allocation is determined by the flexible tolerance method using the number of BP rods as control variable. A practical and efficient PWR reloading optimization program based on above theory has been encoded and successfully applied to Qinshan Nuclear Power Plant (QNP) cycle 2 reloading design

  6. Surveillance of vibrations in PWR

    International Nuclear Information System (INIS)

    Espefaelt, R.; Lorenzen, J.; Aakerhielm, F.

    1980-07-01

    The core of a PWR - including fuel elements, internal structure, control rods and core support structure inside the pressure vessel - is subjected to forces which can cause vibrations. One sensitive means to detect and analyse such vibrations is by means of the noise from incore and excore neutron detector signals. In this project noise recordings have been made on two occasions in the Ringhals 2 plant and the obtained data been analysed using the Studsvik Noise Analysis Program System (SNAPS). The results have been intepreted and a detailed description of the vibrational status of the core and pressure vessel internals has been produced. On the basis of the obtained results it is proposed that neutron signal noise analysis should be performed at each PWR plant in the beginning, middle and end of each fuel cycle and an analysis be made using the methods developed in the project. It would also provide a contribution to a higher degree of preparedness for diagnostic tasks in case of unexpected and abnormal events. (author)

  7. Effect of hydrazine on general corrosion of carbon and low-alloyed steels in pressurized water reactor secondary side water

    Energy Technology Data Exchange (ETDEWEB)

    Järvimäki, Sari [Fortum Ltd, Loviisa Power Plant, Loviisa (Finland); Saario, Timo; Sipilä, Konsta [VTT Technical Research Centre of Finland Ltd., Nuclear Safety, P.O. Box 1000, FIN-02044 VTT (Finland); Bojinov, Martin, E-mail: martin@uctm.edu [Department of Physical Chemistry, University of Chemical Technology and Metallurgy, Kl. Ohridski Blvd, 8, 1756 Sofia (Bulgaria)

    2015-12-15

    Highlights: • The effect of hydrazine on the corrosion of steel in secondary side water investigated by in situ and ex situ techniques. • Oxide grown on steel in 100 ppb hydrazine shows weaker protective properties – higher corrosion rates. • Possible explanation of the accelerating effect of higher concentrations of hydrazine on flow assisted corrosion offered. - Abstract: The effect of hydrazine on corrosion rate of low-alloyed steel (LAS) and carbon steel (CS) was studied by in situ and ex situ techniques under pressurized water reactor secondary side water chemistry conditions at T = 228 °C and pH{sub RT} = 9.2 (adjusted by NH{sub 3}). It is found that hydrazine injection to a maximum level of 5.06 μmol l{sup −1} onto surfaces previously oxidized in ammonia does not affect the corrosion rate of LAS or CS. This is confirmed also by plant measurements at Loviisa NPP. On the other hand, hydrazine at the level of 3.1 μmol l{sup −1} decreases markedly the amount and the size of deposited oxide crystals on LAS and CS surface. In addition, the oxide grown in the presence of 3.1 μmol l{sup −1} hydrazine is somewhat less protective and sustains a higher corrosion rate compared to an oxide film grown without hydrazine. These observations could explain the accelerating effect of higher concentrations of hydrazine found in corrosion studies of LAS and CS.

  8. Hideout and hideout return of tri-sodium phosphate in PWR steam generators

    Energy Technology Data Exchange (ETDEWEB)

    Feron, D.; You, D. [CEA/DEN - Laboratoire d' Etude de la Corrosion Aqueuse, Saclay (France); Turluer, G. [CEA/IPSN-Service d' Analyse des Materiels et des Structures, Fontenay-aux-Roses (France)

    2002-07-01

    Tri-sodium phosphate is used as a chemical conditioner of several sub-systems in secondary circuits of PWR. As confirmed by the international experience feedback of the secondary water chemistry, it can appear as a pollutant of the secondary water circuits, whereby it can concentrate in some areas of restricted flow or deposits in the steam generators. The issues raised by those occurrences prompted the safety French authorities (IPSN) to develop a model boiler investigation programme to assess the respective sodium/phosphate behaviour as a result of hideout and hideout return processes. Hideout and hideout return experiments have been performed with three model boilers in order to investigate the behaviour of tri-sodium phosphate pollution with three different configurations: only tube-tube support plate crevices, only sludge at the bottom of the tubes, or with only ''free'' tube surfaces. Obtained results, with discontinuous pollutions at some mg.kg{sup -1}, can be summarised as follow: low hideout on the free surface of the tubes (less than 10%), hideout is more important when tube-tube support plate crevices are present (10 to 30%), maximum hideout is obtained when there is some sludge at the bottom of the tubes (30 to 90%), Hideout return data are always very low compared to the hideout quantities, due to the formation of solid compound with alumina and silica. (authors)

  9. Hideout and hideout return of tri-sodium phosphate in PWR steam generators

    International Nuclear Information System (INIS)

    Feron, D.; You, D.; Turluer, G.

    2002-01-01

    Tri-sodium phosphate is used as a chemical conditioner of several sub-systems in secondary circuits of PWR. As confirmed by the international experience feedback of the secondary water chemistry, it can appear as a pollutant of the secondary water circuits, whereby it can concentrate in some areas of restricted flow or deposits in the steam generators. The issues raised by those occurrences prompted the safety French authorities (IPSN) to develop a model boiler investigation programme to assess the respective sodium/phosphate behaviour as a result of hideout and hideout return processes. Hideout and hideout return experiments have been performed with three model boilers in order to investigate the behaviour of tri-sodium phosphate pollution with three different configurations: only tube-tube support plate crevices, only sludge at the bottom of the tubes, or with only ''free'' tube surfaces. Obtained results, with discontinuous pollutions at some mg.kg -1 , can be summarised as follow: low hideout on the free surface of the tubes (less than 10%), hideout is more important when tube-tube support plate crevices are present (10 to 30%), maximum hideout is obtained when there is some sludge at the bottom of the tubes (30 to 90%), Hideout return data are always very low compared to the hideout quantities, due to the formation of solid compound with alumina and silica. (authors)

  10. Status and future perspectives of PWR and comparing views on WWER fuel technology

    International Nuclear Information System (INIS)

    Weidinger, H.

    2003-01-01

    The main purpose of this paper is to give an overview on status and future perspectives of the Western PWR fuel technology. For easer understanding and correlating, some comparing views to the WWER fuel technology are provided. This overview of the PWR fuel technology of course can not go into the details of the today used designs of fuel, fuel rods and fuel assemblies. However, it tries to describe the today achieved capability of PWR fuel technology with regard to reliability, efficiency and safety

  11. Investigation and evaluation of erosion-corrosion status of the secondary side steam-water system at Paks Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Schunk, J.; Patek, G.; Pinter, T.; Baracska Varju, I.; Doma, A.; Kovacs, A.; Nemeth, P.; Tilky, P. [Paks Nuclear Power Plant Ltd (Hungary); Osz, J. [Budapest Univ. of Science and Economy (Hungary)

    2009-07-01

    There were four identical VVER-440 type units installed at Paks Nuclear Power Plant with 440 MW electrical capacity of each, between 1982 and 1987. Based on inherent reserve capacity of these units, the operational and maintenance experiences and examples of power upgrading abroad it was decided to increase the power of our units in a stepwise way. Presently, this upgrading project is close to finalization resulting in 500 MW electrical capacity of each unit. To realize the planned electrical power increase it was necessary to increase the primary and secondary heat power, which requested the increase of mass flow, temperature and pressure of secondary coolant flowing through the steam generators. According to the preliminary expert evaluations these increased parameters would not cause such an increase in humidity of steam leaving the turbine houses that could adversely impair our long term power upgrading plans. The steam humidity was determined on our units and the values did not even exceed the original design values. In spite of these preliminary investigations, significant accumulation of erosion-corrosion products at different places of secondary circuit was found and erosion damages of some secondary side equipment were discovered as a probable consequence of power upgrading. An extensive evaluation programme has been started involving experts and institutes of material testing, chemistry and hydrodynamics. Results and details of that work are given in our presentation. (authors)

  12. Study of the distribution of hydrogen in a PWR containment with CFD codes; Estudio de la distribucion de hidrogeno en una contencion PWR con codigos CFD

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez, G.; Matias, R.; Fernandez, K.; Justo, D.; Bocanegra, R.; Mena, L.; Queral, C.

    2015-07-01

    During a severe accident in a PWR, the hydrogen generated may be distributed in the containment atmosphere and reach the combustion conditions that can cause the containment failure. In this research project, a preliminary study has been done about the capacities of ANSYS Fluent 15.0 and GOTHIC 8.0 to tri dimensional distribution of the hydrogen in a PWR containment during a severe accident. (Author)

  13. The Conceptual Design of Innovative Safe PWR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Han-Gon [Centural Research Institute, Daejeon (Korea, Republic of); Heo, Sun [Korea Hydro and Nuclear Power Co., Daejeon (Korea, Republic of)

    2016-10-15

    Most of countries operating NPPs have been performed post-Fukushima improvements as short-term countermeasure to enhance the safety of operating NPPs. Separately, vendors have made efforts on developing passive safety systems as long-term and ultimate countermeasures. AP1000 designed by Westinghouse Electric Company has passive safety systems including the passive emergency core cooling system (PECCS), the passive residual heat removal system (PRHRS), and the passive containment cooling system (PCCS). ESBWR designed by GE-Hitachi also has passive safety systems consisting of the isolation condenser system, the gravity driven cooling system and the PCCS. Other countries including China and Russia have made efforts on developing passive safety systems for enhancing the safety of their plants. In this paper, we summarize the design goals and main design feature of innovative safe PWR, iPOWER which is standing for Innovative Passive Optimized World-wide Economical Reactor, and show the developing status and results of research projects. To mitigate an accident without electric power and enhance the safety level of PWR, the conceptual designs of passive safety system and innovative safe PWR have been performed. It includes the PECCS for core cooling and the PCCS for containment cooling. Now we are performing the small scale and separate effect tests for the PECCS and the PCCS and preparing the integral effect test for the PECCS and real scale test for the PCCS.

  14. Environmental effects on materials in operating power reactors

    International Nuclear Information System (INIS)

    Weeks, J.R.

    1984-01-01

    This paper reviews several areas in which corrosion problems have occurred and what can be done to help improve future performance: BWR pipe cracking, PWR steam generators, Three Mile Island-thiosulfate contamination, secondary side problems, mechanical damage (Ginna), piping and vessel cracking, turbine cracking, and bolting. The safety and operational issues involved are listed

  15. The advanced main control console for next japanese PWR plants

    International Nuclear Information System (INIS)

    Tsuchiya, A.; Ito, K.; Yokoyama, M.

    2001-01-01

    The purpose of the improvement of main control room designing in a nuclear power plant is to reduce operators' workload and potential human errors by offering a better working environment where operators can maximize their abilities. In order to satisfy such requirements, the design of main control board applied to Japanese Pressurized Water Reactor (PWR) type nuclear power plant has been continuously modified and improved. the Japanese Pressurized Water Reactor (PWR) Utilities (Electric Power Companies) and Mitsubishi Group have developed an advanced main control board (console) reflecting on the study of human factors, as well as using a state of the art electronics technology. In this report, we would like to introduce the configuration and features of the Advanced Main Control Console for the practical application to the next generation PWR type nuclear power plants including TOMARI No.3 Unit of Hokkaido Electric Power Co., Inc. (author)

  16. Connection of superaccident feed pumps, especially for PWR or WWER power plants

    International Nuclear Information System (INIS)

    Sykora, D.

    1983-01-01

    The design is described of a superaccident feed pump for emergency water supply from storage tanks to the steam generator. Between the pump and the steam generator in the connecting pipe is installed an injector mixer, possibly complete with a heat exchanger. The output of the injector mixer is connected to the secondary side of the steam generator, the input of the forced or drawn medium is connected either to the steam space or to the water space of the secondary side of the steam generator. The said connection will considerably reduce the heat impact which threatens the integrity of the construction material of the steam generator during transition to superaccident feeding. (M.D.)

  17. Modified ADS molten salt processes for back-end fuel cycle of PWR spent fuel

    International Nuclear Information System (INIS)

    Choi, In-Kyu; Yeon, Jei-Won; Kim, Won-Ho

    2002-01-01

    The back-end fuel cycle concept for PWR spent fuel is explained. This concept is adequate for Korea, which has operated both PWR and CANDU reactors. Molten salt processes for accelerator driven system (ADS) were modified both for the transmutation of long-lived radioisotopes and for the utilisation of the remained fissile uranium in PWR spent fuels. Prior to applying molten salt processes to PWR fuel, hydrofluorination and fluorination processes are applied to obtain uranium hexafluoride from the spent fuel pellet. It is converted to uranium dioxide and fabricated into CANDU fuel. From the remained fluoride compounds, transuranium elements can be separated by the molten salt technology such as electrowinning and reductive extraction processes for transmutation purpose without weakening the proliferation resistance of molten salt technology. The proposed fuel cycle concept using fluorination processes is thought to be adequate for our nuclear program and can replace DUPIC (Direct Use of spent PWR fuel in CANDU reactor) fuel cycle. Each process for the proposed fuel cycle concept was evaluated in detail

  18. Decay ratio studies in BWR and PWR using wavelet

    International Nuclear Information System (INIS)

    Ciftcioglu, Oe.

    1996-10-01

    The on-line stability of BWR and PWR is studied using the neutron noise signals as the fluctuations reflect the dynamic characteristics of the reactor. Using appropriate signal modeling for time domain analysis of noise signals, the stability parameters can be directly obtained from the system impulse response. Here in particular for BWR, an important stability parameter is the decay ratio (DR) of the impulse response. The time series analysis involves the autoregressive modeling of the neutron detector signal. The DR determination is strongly effected by the low frequency behaviour since the transfer function characteristic tends to be a third order system rather than a second order system for a BWR. In a PWR low frequency behaviour is modified by the Boron concentration. As a result of these phenomena there are difficulties in the consistent determination of the DR oscillations. The enhancement of the consistency of this DR estimation is obtained by wavelet transform using actual power plant data from BWR and PWR. A comparative study of the Restimation with and without wavelets are presented. (orig.)

  19. Benchmarking Computational Fluid Dynamics for Application to PWR Fuel

    International Nuclear Information System (INIS)

    Smith, L.D. III; Conner, M.E.; Liu, B.; Dzodzo, B.; Paramonov, D.V.; Beasley, D.E.; Langford, H.M.; Holloway, M.V.

    2002-01-01

    The present study demonstrates a process used to develop confidence in Computational Fluid Dynamics (CFD) as a tool to investigate flow and temperature distributions in a PWR fuel bundle. The velocity and temperature fields produced by a mixing spacer grid of a PWR fuel assembly are quite complex. Before using CFD to evaluate these flow fields, a rigorous benchmarking effort should be performed to ensure that reasonable results are obtained. Westinghouse has developed a method to quantitatively benchmark CFD tools against data at conditions representative of the PWR. Several measurements in a 5 x 5 rod bundle were performed. Lateral flow-field testing employed visualization techniques and Particle Image Velocimetry (PIV). Heat transfer testing involved measurements of the single-phase heat transfer coefficient downstream of the spacer grid. These test results were used to compare with CFD predictions. Among the parameters optimized in the CFD models based on this comparison with data include computational mesh, turbulence model, and boundary conditions. As an outcome of this effort, a methodology was developed for CFD modeling that provides confidence in the numerical results. (authors)

  20. Actinides transmutation - a comparison of results for PWR benchmark

    International Nuclear Information System (INIS)

    Claro, Luiz H.

    2009-01-01

    The physical aspects involved in the Partitioning and Transmutation (P and T) of minor actinides (MA) and fission products (FP) generated by reactors PWR are of great interest in the nuclear industry. Besides these the reduction in the storage of radioactive wastes are related with the acceptability of the nuclear electric power. From the several concepts for partitioning and transmutation suggested in literature, one of them involves PWR reactors to burn the fuel containing plutonium and minor actinides reprocessed of UO 2 used in previous stages. In this work are presented the results of the calculations of a benchmark in P and T carried with WIMSD5B program using its new cross sections library generated from the ENDF-B-VII and the comparison with the results published in literature by other calculations. For comparison, was used the benchmark transmutation concept based in a typical PWR cell and the analyzed results were the k∞ and the atomic density of the isotopes Np-239, Pu-241, Pu-242 and Am-242m, as function of burnup considering discharge of 50 GWd/tHM. (author)

  1. A scheme of better utilization of PWR spent fuels

    International Nuclear Information System (INIS)

    Chung, Bum Jin; Kang, Chang Soon

    1991-01-01

    The recycle of PWR spent fuels in a CANDU reactor, so called the tandem fuel cycle is investigated in this study. This scheme of utilizing PWR spent fuels will ease the shortage of spent fuel storage capacity as well as will improve the use of uranium resources. The minimum modification the design of present CANDU reactor is seeked in the recycle. Nine different fuel types are considered in this work and are classified into two categories: refabrication and reconfiguration. For refabrication, PWR spent fuels are processed and refabricated into the present 37 rod lattice structure of fuel bundle, and for reconfiguration, meanwhile, spent fuels are simply disassembled and rods are cut to fit into the present grid configuration of fuel bundle without refabrication. For each fuel option, the neutronics calculation of lattice was conducted to evaluate the allowable burn up and distribution. The fuel cycle cost of each option was also computed to assess the economic justification. The results show that most tandem fuel cycle option considered in this study are technically feasible as well as economically viable. (Author)

  2. Magnetite solubility studies under simulated PWR primary-side conditions, using lithiated, hydrogenated water

    International Nuclear Information System (INIS)

    Hewett, John; Morrison, Jonathan; Cooper, Christopher; Ponton, Clive; Connolly, Brian; Dickinson, Shirley; Henshaw, Jim

    2014-01-01

    As software for modelling dissolution, precipitation, and transport of metallic species and subsequent CRUD deposition within nuclear plant becomes more advanced, there is an increasing need for accurate and reliable thermodynamic data. The solubility behaviour of magnetite is an example of such data, and is central to any treatment of CRUD solubility due to the prevalence of magnetite and nickel ferrites in CRUD. Several workers have shown the most consistent solubility data comes from once-through flowing systems. However, despite a strong consensus between the results in acidic to mildly alkaline solutions, there is disagreement between the results at approximately pH 25C 9 and higher. A programme of experimental work is on-going at the University of Birmingham, focusing on solubility of metal oxides (e.g., magnetite) in conditions relevant to PWR primary coolant. One objective of this programme is to calculate thermodynamic constants from the data obtained. Magnetite solubility from 200 to 300°C, in lithiated, hydrogenated water of pH 25C 9–11 is being studied using a once-through rig constructed of 316L stainless steel. The feedwater is pumped at 100 bar pressure through a heated bed of magnetite granules, and the output solution is collected and analysed for iron and several other metals by ICP-MS. This paper presents results from preliminary tests without magnetite granules, in which the corroding surface of the rig itself was used as the sole source of soluble iron and of dissolved hydrogen. Levels of iron were generally within an order of magnitude of literature solubility values. Comparison of results at different flow rates and temperatures, in conjunction with conclusions drawn from the published literature, suggests that this is likely due to the presence of particulate matter in a greatly under-saturated solution, compensating for the low surface area of oxide in contact with the solution. (author)

  3. Evaluation of CRUDTRAN code to predict transport of corrosion products and radioactivity in the PWR primary coolant system

    International Nuclear Information System (INIS)

    Lee, C.B.

    2002-01-01

    CRUDTRAN code is to predict transport of the corrosion products and their radio-activated nuclides such as cobalt-58 and cobalt-60 in the PWR primary coolant system. In CRUDTRAN code the PWR primary circuit is divided into three principal sections such as the core, the coolant and the steam generator. The main driving force for corrosion product transport in the PWR primary coolant comes from coolant temperature change throughout the system and a subsequent change in corrosion product solubility. As the coolant temperature changes around the PWR primary circuit, saturation status of the corrosion products in the coolant also changes such that under-saturation in steam generator and super-saturation in the core. CRUDTRAN code was evaluated by comparison with the results of the in-reactor loop tests simulating the PWR primary coolant system and PWR plant data. It showed that CRUDTRAN could predict variations of cobalt-58 and cobalt-60 radioactivity with time, plant cycle and coolant chemistry in the PWR plant. (author)

  4. Assessment of void swelling in austenitic stainless steel PWR core internals

    International Nuclear Information System (INIS)

    Chung, H.M.

    2006-01-01

    As many pressurized water reactors (PWRs) age and life extension of the aged plants is considered, void swelling behavior of austenitic stainless steel (SS) core internals has become the subject of increasing attention. In this report, the available database on void swelling and density change of austenitic SSs was critically reviewed. Irradiation conditions, test procedures, and microstructural characteristics were carefully examined, and key factors that are important to determine the relevance of the database to PWR conditions were evaluated. Most swelling data were obtained from steels irradiated in fast breeder reactors at temperatures >385 C and at dose rates that are orders of magnitude higher than PWR dose rates. Even for a given irradiation temperature and given steel, the integral effects of dose and dose rate on void swelling should not be separated. It is incorrect to extrapolate swelling data on the basis of 'progressive compounded multiplication' of separate effects of factors such as dose, dose rate, temperature, steel composition, and fabrication procedure. Therefore, the fast reactor data should not be extrapolated to determine credible void swelling behavior for PWR end-of-life (EOL) or life-extension conditions. Although the void swelling data extracted from fast reactor studies is extensive and conclusive, only limited amounts of swelling data and information have been obtained on microstructural characteristics from discharged PWR internals or steels irradiated at temperatures and at dose rates comparable to those of a PWR. Based on this relatively small amount of information, swelling in thin-walled tubes and baffle bolts in a PWR is not considered a concern. As additional data and relevant research becomes available, the newer results should be integrated with existing data, and the worthiness of this conclusion should continue to be scrutinized. PWR baffle reentrant corners are the most likely location to experience high swelling rates, and

  5. Radionuclide compositions of spent fuel and high level waste for the uranium and plutonium fuelled PWR

    International Nuclear Information System (INIS)

    Fairclough, M.P.; Tymons, B.J.

    1985-06-01

    The activities of a selection of radionuclides are presented for three types of reactor fuel of interest in radioactive waste management. The fuel types are for a uranium 'burning' PWR, a plutonium 'burning' PWR using plutonium recycled from spent uranium fuel and a plutonium 'burning' PWR using plutonium which has undergone multiple recycle. (author)

  6. Study on advanced nuclear fuel cycle of PWR/CANDU synergism

    International Nuclear Information System (INIS)

    Xie Zhongsheng; Huo Xiaodong

    2002-01-01

    According to the concrete condition that China has both PWR and CANDU reactors, one of the advanced nuclear fuel cycle strategy of PWR/CANDU synergism ws proposed, i.e. the reprocessed uranium of spent PWR fuel was used in CANDU reactor, which will save the uranium resource, increase the energy output, decrease the quantity of spent fuels to be disposed and lower the cost of nuclear power. Because of the inherent flexibility of nuclear fuel cycle in CANDU reactor, the transition from the natural uranium to the recycled uranium (RU) can be completed without any changes of the structure of reactor core and operation mode. Furthermore, because of the low radiation level of RU, which is acceptable for CANDU reactor fuel fabrication, the present product line of fuel elements of CANDU reactor only need to be shielded slightly, also the conditions of transportation, operation and fuel management need not to be changed. Thus this strategy has significant practical and economical benefit

  7. Validating Westinghouse atom 16 x 16 and 18 x 18 PWR fuel performance

    International Nuclear Information System (INIS)

    Andersson, S.; Gustafson, J.; Jourdain, P.; Lindstroem, L.; Hallstadius, L.; Hofling, C.G.

    2001-01-01

    Westinghouse Atom designs and fabricates PWR fuel for all major European fuel types: 17 x 17 standard (12 ft) and 17 x 17 XL (14 ft) for Westinghouse type PWRs, and 16 x 16 and 18 x 18 fuel for Siemens type PWRs. The W Atom PWR fuel designs are based on the extensive Westinghouse CE PWR fuel experience from combustion engineering type PWRs. The W atom designs utilise basic design features from the W CE fuel tradition, such as all-Zircaloy mid grids and the proven ( 6 rod years) Guardian TM debris catcher, which is integrated in the bottom Inconel grid. Several new features have been developed to meet with stringent European requirements originating from requirements on very high burnup, in combination with low-leakage core operating strategies and high coolant temperatures. The overall reliability of the Westinghouse Atom PWR fuel is very high; no fuel failure has been detected since 1997. (orig.)

  8. Approximation for maximum pressure calculation in containment of PWR reactors

    International Nuclear Information System (INIS)

    Souza, A.L. de

    1989-01-01

    A correlation was developed to estimate the maximum pressure of dry containment of PWR following a Loss-of-Coolant Accident - LOCA. The expression proposed is a function of the total energy released to the containment by the primary circuit, of the free volume of the containment building and of the total surface are of the heat-conducting structures. The results show good agreement with those present in Final Safety Analysis Report - FSAR of several PWR's plants. The errors are in the order of ± 12%. (author) [pt

  9. Sensitivity of risk parameters to human errors for a PWR

    International Nuclear Information System (INIS)

    Samanta, P.; Hall, R.E.; Kerr, W.

    1980-01-01

    Sensitivities of the risk parameters, emergency safety system unavailabilities, accident sequence probabilities, release category probabilities and core melt probability were investigated for changes in the human error rates within the general methodological framework of the Reactor Safety Study for a Pressurized Water Reactor (PWR). Impact of individual human errors were assessed both in terms of their structural importance to core melt and reliability importance on core melt probability. The Human Error Sensitivity Assessment of a PWR (HESAP) computer code was written for the purpose of this study

  10. Pressurized Water Reactors (PWR) and Boiling Water Reactors (BWR) are compared

    International Nuclear Information System (INIS)

    Greneche, D.

    2014-01-01

    This article compares the 2 types of light water reactors that are used to produce electricity: the Pressurized Water Reactor (PWR) and the Boiling Water Reactor (BWR). Historically the BWR concept was developed after the PWR concept. Today 80% of light water reactors operating in the world are of PWR-type. This comparison is comprehensive and detailed. First the main technical features are reviewed and compared: reactor architecture, core and fuel design, reactivity control, reactor vessel, cooling systems and reactor containment. Secondly, various aspects concerning reactor operations like reactor control, fuel management, maintenance, inspections, radiation protection, waste generation and reactor reliability are presented and compared for both reactors. As for the issue of safety, it is highlighted that the accidental situations are too different for the 2 reactors to be compared. The main features of reactor safety are explained for both reactors

  11. Stress corrosion cracking of Alloy 600 in primary water of PWR: study of chromium diffusion

    International Nuclear Information System (INIS)

    Chetroiu, Bogdan-Adrian

    2015-01-01

    Alloy 600 (Ni-15%Cr-10%Fe) is known to be susceptible to Stress Corrosion Cracking (SCC) in primary water of Pressurized Water Reactors (PWR). Recent studies have shown that chromium diffusion is a controlling rate step in the comprehension of SCC mechanism. In order to improve the understanding and the modelling of SCC of Alloy 600 in PWR primary medium the aim of this study was to collect data on kinetics diffusion of chromium. Volume and grain boundary diffusion of chromium in pure nickel and Alloy 600 (mono and poly-crystals) has been measured in the temperature range 678 K to 1060 K by using Secondary Ions Mass Spectroscopy (SIMS) and Glow Discharge-Optical Spectrometry (GD-OES) techniques. A particular emphasis has been dedicated to the influence of plastic deformation on chromium diffusion in nickel single crystals (orientated <101>) for different metallurgical states. The experimental tests were carried out in order to compare the chromium diffusion coefficients in free lattice (not deformed), in pre-hardening specimens (4% and 20%) and in dynamic deformed tensile specimens at 773 K. It has been found that chromium diffusivity measured in dynamic plastic deformed creep specimens were six orders of magnitude greater than those obtained in not deformed or pre-hardening specimens. The enhancement of chromium diffusivity can be attributed to the presence of moving dislocations generated during plastic deformation. (author)

  12. Application of surface science to the study of the corrosion of PWR primary circuit materials

    International Nuclear Information System (INIS)

    Harris, S.J.

    1989-04-01

    This thesis describes a study of the corrosion and oxidation of PWR primary circuit materials using surface sensitive spectroscopic techniques. An X-ray photoemission spectroscopy (XPS) study of a number of mixed oxides of known composition is described and the information obtained is related to XPS measurements made on the surface of iron and nickel based alloys oxidised under controlled conditions. A secondary ion mass spectroscopy (SIMA) study on these mixed transition metal oxides is also described. The gaseous oxidation of stainless steel 3041 and Inconel-690 is examined. Both alloys were oxidised at 600K in air with the composition of the oxide films formed studied by a range of surface spectroscopic methods. Further experimental work was performed on Inconel-690 to examine the effects of surface pretreatment and the effects of low oxygen partial pressures on the formation of oxide films at 600 K. The incorporation of the radionuclide, cobalt-60, into the oxide films formed on structural components of a PWR, result in the build up of radiation fields. A method of pretreating the surface of the alloy stainless steel 3041, in order to reduce the level of cobalt adsorbed into the oxide film formed under simulated primary coolant conditions is examined and contrasts with treatments which have been developed to release cobalt adsorbed in existing oxide layers under reactor conditions are discussed. (author)

  13. Identification and evaluation of PWR in-vessel severe accident management strategies

    International Nuclear Information System (INIS)

    Dukelow, J.S.; Harrison, D.G.; Morgenstern, M.

    1992-03-01

    This reports documents work performed the NRC/RES Accident Management Guidance Program to evaluate possible strategies for mitigating the consequences of PWR severe accidents. The selection and evaluation of strategies was limited to the in-vessel phase of the severe accident, i.e., after the initiation of core degradation and prior to RPV failure. A parallel project at BNL has been considering strategies applicable to the ex-vessel phase of PWR severe accidents

  14. Hydrogen production in a PWR during LOCA

    International Nuclear Information System (INIS)

    Cassette, P.

    1983-12-01

    The purpose of this paper is to provide information on hydrogen generation during LOCA in French 900 MW PWR power plants. The design basis accident is taken into account as well as more severe accidents assuming failure of emergency systems

  15. An evaluation of tight - pitch PWR cores

    International Nuclear Information System (INIS)

    Correa, F.

    1980-01-01

    The subtask of a project carried out at MIT (Massachusetts Institute of Technology) for DOE (Department of Energy) as part of their NASAP/INFCE - related effects involving the optimization of PWR lattices in the recycle model is summarized. (E.G.) [pt

  16. Coolant monitoring systems for PWR reactors

    International Nuclear Information System (INIS)

    Luzhnov, A.M.; Morozov, V.V.; Tsypin, S.G.

    1987-01-01

    The ways of improving information capacity of existing monitoring systems and the necessity of designing new ones for coolant monitoring are reviewed. A wide research program on development of coolant monitoring systems in PWR reactors is analyzed. The possible applications of in-core and out-of-core detectors for coolant monitoring are demonstrated

  17. Study on thermal-hydraulics during a PWR reflood phase

    Energy Technology Data Exchange (ETDEWEB)

    Iguchi, Tadashi [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-10-01

    In-core thermal-hydraulics during a PWR reflood phase following a large-break LOCA are quite unique in comparison with two-phase flow which has been studied widely in previous researches, because the geometry of the flow path is complicated (bundle geometry) and water is at extremely low superficial velocity and almost under stagnant condition. Hence, some phenomena realized during a PWR reflood phase are not understood enough and appropriate analytical models have not been developed, although they are important in a viewpoint of reactor safety evaluation. Therefore, author investigated some phenomena specified as important issues for quantitative prediction, i.e. (1) void fraction in a bundle during a PWR reflood phase, (2) effect of radial core power profile on reflood behavior, (3) effect of combined emergency core coolant injection on reflood behavior, and (4) the core separation into two thermal-hydraulically different regions and the in-core flow circulation behavior observed during a combined injection PWR reflood phase. Further, author made analytical models for these specified issues, and succeeded to predict reflood behaviors at representative types of PWRs, i.e.cold leg injection PWRs and Combined injection PWRs, in good accuracy. Above results were incorporated into REFLA code which is developed at JAERI, and they improved accuracy in prediction and enlarged applicability of the code. In the present study, models were intended to be utilized in a practical use, and hence these models are simplified ones. However, physical understanding on the specified issues in the present study is basic and principal for reflood behavior, and then it is considered to be used in a future advanced code development and improvement. (author). 110 refs.

  18. Application of digital control in Japanese PWR Plants

    International Nuclear Information System (INIS)

    Taguchi, S.; Kondo, Y.; Teranishi, S.; Matsumiya, M.; Takashima, M.; Nagai, T.

    1986-01-01

    More reliable and flexible control system to improve the plant availability and operability is constantly demanded. In order to answer the demands, digital control systems are being applied to Japanese PWR plants. Microprocessor-based digital control systems are widely used in other industries and show good performance. The digital control system has been already applied to the chemical and volume control system and the radioactive waste disposal system in the operating plants. These systems have been working as expected and demonstrating good performances. The digital control system for the reactor control system, which is the main control system of the PWR plants, is being developed. The design of the system has been already finished and the verification/validation process is now in progress

  19. BEACON TSM application system to the operation of PWR reactors

    International Nuclear Information System (INIS)

    Lozano, J. A.; Mildrum, C.; Serrano, J. F.

    2012-01-01

    BEACON-TSM is an advanced core monitoring system for PWR reactor cores, and also offers the possibility to perform a wide range of predictive calculation in support of reactor operation. BEACON-TSM is presently installed and licensed in the 5 Spanish PWR reactors of standard Westinghouse design. the purpose of this paper is to describe the features of this software system and to show the advantages obtainable by a nuclear power plant from its use. To illustrate the capabilities and benefits of BEACON-TSM two real case reactor operating situations are presented. (Author)

  20. The study on radioactivity reduction of spent PWR cladding hull

    International Nuclear Information System (INIS)

    Jung, I. H.; Kim, J. H.; Park, C. J.; Jung, Y. H.; Song, K. C.; Lee, J. W.; Park, J. J.; Yang, M. S.

    2003-01-01

    Hull arising from the spent PWR fuel elements is classified as a high-level radioactive waste. This report describes the radio-chemical characteristics of the hull-from PWR spent fuel of 32,000MWd/tU burn-up and 15 years cooling, discharged from Gori Unit I cycled 4-7-by examination and literature survey. On the basis of the results, a method of degradation to middle and low-level radioactive waste was proposed by dry process such as laser or plasma technique with removing the nuclides deposited on the surface of the hull

  1. The traveller: a new look for PWR fresh fuel packages

    International Nuclear Information System (INIS)

    Bayley, B.; Stilwell, W.E.; Kent, N.A.

    2004-01-01

    The Traveller PWR fresh fuel shipping package represents a radical departure from conventional PWR fuel package designs. This paper follows the development effort from the establishment of goals and objectives, to intermediate testing and analysis, to final testing and licensing. The discussion starts with concept origination and covers the myriad iterations that followed until arriving at a design that would meet the demanding licensing requirements, last for 30 years, and would be easy to load and unload fuel, easy to handle, inexpensive to manufacture and transport, and simple and inexpensive to maintain

  2. Transient performance of flow in circuits of PWR type reactors

    International Nuclear Information System (INIS)

    Hirdes, V.R.; Carajilescov, P.

    1988-09-01

    Generally, PWR's are designed with several primary loops, each one provided with a pump to circulate the coolant through the core. If one or more of these pumps fail, there would be a decrease in reactor flow rate which could cause coolant phase change in the core and components overheating. The present work establishes a simulation model for pump failure in PWR's and the SARDAN-FLOW computes code was developed, considering any combination of such failures. Based on the data of Angra I, several accident and operational transient conditions were simulated. (author) [pt

  3. 3-D full core calculations for the long-term behaviour of PWR's

    International Nuclear Information System (INIS)

    Winter, H.J.; Koebke, K.; Wagner, M.R.

    1987-01-01

    Presently, the most realistic simulation of a PWR core is by means of three-dimensional (3-D) full core calculations. Only by such 3-D representations can the large scope of axial effects be treated in an accurate and direct way, without the need to perform various auxiliary calculations. Although the computationally efficient burnup-corrected nodal expansion method (NEM-BC) is used, the computing effort for 3-D reactor calculations becomes rather high, e.g. a storage of about 320000 words is required to describe a 1300 MWe PWR. NEM-BC was introduced (1979) into KWU's package of PWR design codes because of its high accuracy and the great reduction of computing time and storage requirements in comparison to other methods. The application of NEM-BC to 3-dimensional PWR design is strongly correlated with the progress achieved in the solution of the homogenization and dehomogenization problem. By means of suitable methods (equivalence theory) the transport-theoretical information of the pinwise power and burnup distribution for the heterogeneous fuel assemblies is transferred in a consistent manner to the full core reactor solution. The new methods and the corresponding code system are explained in some detail. (orig.)

  4. Carbon steel corrosion prevention during chemical cleaning of steam generator secondary side components

    International Nuclear Information System (INIS)

    Fulger, M.; Lucan, D.; Velciu, L.

    2009-01-01

    During operation of a nuclear power plant, many contaminants, such as solid particles or dissolved species are formed in the secondary circuit, go into steam generator and deposit as scales on heat transfer tubing, support plate or as sludge on tube sheet. By accumulation of these impurities, heat transfer is reduced and the integrity of the steam generator tubing is influenced. Chemical cleaning is a qualified, efficient measure to improve steam generator corrosion performance. The corrosion mechanism can be counteracted by the chemical cleaning of the deposits on the tube sheet and the scales on the heat transfer tubing. The major component of the scales is magnetite, which can be dissolved using an organic chelating agent (ethylenediaminetetraacetic acid, EDTA) in combination with a complexing agent such as citric acid in an alkaline reducing environment. As the secondary side of SG is a conglomerate of alloys it is necessary to choose an optimal chemical cleaning solution for an efficient cleaning properties and at the same time with capability of corrosion prevention of carbon steel components during the process. The paper presents laboratory tests initiated to confirm the ability of this process to clean the SG components. The experiments followed two paths: - first, carbon steel samples have been autoclavized in specific secondary circuit solutions of steam generator to simulate the deposits constituted during operation of this equipment; - secondly, autoclavized samples have been cleaned with a solvent composed of EDTA citric acid, hydrazine of pH = 5 and temperature of 85 deg. C. Before chemical cleaning, the oxide films were characterized by surface analysis techniques including optical microscopy, scanning electron microscopy (SEM) and electrochemical impedance spectroscopy (EIS). Applied to dissolve corrosion products formed in a steam generator, the solvents based on chelating agents are aggressive toward carbon steels and corrosion inhibitors are

  5. Reliability of PWR type nuclear power plants

    International Nuclear Information System (INIS)

    Ribeiro, A.A.T.; Muniz, A.A.

    1978-12-01

    Results of the analysis of factors influencing the reliability of international nuclear power plants of the PWR type are presented. The reliability factor is estimated and the probability of its having lower values than a certain specified value is discussed. (Author) [pt

  6. Thermohydraulic calculations of PWR primary circuits

    International Nuclear Information System (INIS)

    Botelho, D.A.

    1984-01-01

    Some mathematical and numerical models from Retran computer codes aiming to simulate reactor transients, are presented. The equations used for calculating one-dimensional flow are integrated using mathematical methods from Flash code, with steam code to correlate the variables from thermodynamic state. The algorithm obtained was used for calculating a PWR reactor. (E.G.) [pt

  7. Analysis of difficulties accounting and evaluating nuclear material of PWR fuel plant

    International Nuclear Information System (INIS)

    Zhang Min; Jue Ji; Liu Tianshu

    2013-01-01

    Background: Nuclear materials accountancy must be developed for nuclear facilities, which is required by regulatory in China. Currently, there are some unresolved problems for nuclear materials accountancy of bulk nuclear facilities. Purpose: The retention values and measurement errors are analyzed in nuclear materials accountancy of Power Water Reactor (PWR) fuel plant to meet the regulatory requirements. Methods: On the basis of nuclear material accounting and evaluation data of PWR fuel plant, a deep analysis research including ratio among random error variance, long-term systematic error variance, short-term systematic error variance and total error involving Material Unaccounted For (MUF) evaluation is developed by the retention value measure in equipment and pipeline. Results: In the equipment pipeline, the holdup estimation error and its total proportion are not more than 5% and 1.5%, respectively. And the holdup estimation can be regraded as a constant in the PWR nuclear material accountancy. Random error variance, long-term systematic error variance, short-term systematic error variance of overall measurement, and analytical and sampling methods are also obtained. A valuable reference is provided for nuclear material accountancy. Conclusion: In nuclear material accountancy, the retention value can be considered as a constant. The long-term systematic error is a main factor in all errors, especially in overall measurement error and sampling error: The long-term systematic errors of overall measurement and sampling are considered important in the PWR nuclear material accountancy. The proposals and measures are applied to the nuclear materials accountancy of PWR fuel plant, and the capacity of nuclear materials accountancy is improved. (authors)

  8. Data assimilation and PWR primary measurement

    International Nuclear Information System (INIS)

    Mercier, Thibaud

    2015-01-01

    A Pressurized Water Reactor (PWR) Reactor Coolant System (RCS) is a highly complex physical process: heterogeneous power, flow and temperature distributions are difficult to be accurately measured, since instrumentations are limited in number, thus leading to the relevant safety and protection margins. EDF R and D is seeking to assess the potential benefits of applying Data Assimilation to a PWR's RCS (Reactor Coolant System) measurements, in order to improve the estimators for parameters of a reactor's operating setpoint, i.e. improving accuracy and reducing uncertainties and biases of measured RCS parameters. In this thesis, we define a 0D semi-empirical model for RCS, satisfying the description level usually chosen by plant operators, and construct a Monte-Carlo Method (inspired from Ensemble Methods) in order to use this model with Data Assimilation tools. We apply this method on simulated data in order to assess the reduction of uncertainties on key parameters: results are beyond expectations, however strong hypothesis are required, implying a careful preprocessing of input data. (author)

  9. Validation of gadolinium burnout using PWR benchmark specification

    Energy Technology Data Exchange (ETDEWEB)

    Oettingen, Mikołaj, E-mail: moettin@agh.edu.pl; Cetnar, Jerzy, E-mail: cetnar@mail.ftj.agh.edu.pl

    2014-07-01

    Graphical abstract: - Highlights: • We present methodology for validation of gadolinium burnout in PWR. • We model 17 × 17 PWR fuel assembly using MCB code. • We demonstrate C/E ratios of measured and calculated concentrations of Gd isotopes. • The C/E for Gd154, Gd156, Gd157, Gd158 and Gd160 shows good agreement of ±10%. • The C/E for Gd152 and Gd155 shows poor agreement below ±10%. - Abstract: The paper presents comparative analysis of measured and calculated concentrations of gadolinium isotopes in spent nuclear fuel from the Japanese Ohi-2 PWR. The irradiation of the 17 × 17 fuel assembly containing pure uranium and gadolinia bearing fuel pins was numerically reconstructed using the Monte Carlo Continuous Energy Burnup Code – MCB. The reference concentrations of gadolinium isotopes were measured in early 1990s at Japan Atomic Energy Research Institute. It seems that the measured concentrations were never used for validation of gadolinium burnout. In our study we fill this gap and assess quality of both: applied numerical methodology and experimental data. Additionally we show time evolutions of infinite neutron multiplication factor K{sub inf}, FIMA burnup, U235 and Gd155–Gd158. Gadolinium-based materials are commonly used in thermal reactors as burnable absorbers due to large neutron absorption cross-section of Gd155 and Gd157.

  10. Performance of high burned PWR fuel during transient

    International Nuclear Information System (INIS)

    Yanagisawa, Kazuaki; Fujishiro, Toshio

    1992-01-01

    In a majority of Japanese light water type commercial powder reactors (LWRs), UO 2 pellet sheathed by zircaloy cladding is used. Licensed discharged burn-up of the PWR fuel rod is going to be increased from 39 MWd/kgU to 48 MWd/kgU. This requests the increased reliability of cladding material as a strong barrier against fission product (FP). A long time usage in the neutron field and in the high temperature coolant will cause the zircaloy hardening and embrittlement. The cladding material is also degraded by waterside corrosion. These degradations are enhanced much by increased burn-up. A increased magnitude of the pellet-cladding mechanical interaction (PCMI) is of importance for increasing the stress of cladding material. In addition, aggressive FPs released from the fuel tends to attack the cladding material to cause stress corrosion cracking (SCC). At the Nuclear Safety Research Reactor (NSRR) in JAERI, 14 x 14 PWR type fuel rods preirradiation up to 42 MWd/kgU was prepared for the transient pulse irradiation under the simulated reactivity initiated accident (RIA) conditions. This will cause a prompt increase of the fuel temperature and stress on the highly burned cladding material. In the present paper, steady-state and transient behavior observed from the tested PWR fuel rod and calculational results obtained from the computer code FPRETAIN will be described. (author)

  11. Maintenance service for major component of PWR plant. Replacement of pressurizer safe end weld

    International Nuclear Information System (INIS)

    Miyoshi, Yoshiyuki; Kobayashi, Yuki; Yamamoto, Kazuhide; Ueda, Takeshi; Suda, Naoki; Shintani, Takashi

    2017-01-01

    In October 2016, MHI completed the replacement of safe end weld of pressurizer (Pz) of Ringhals unit 3, which was the first maintenance work for main component of pressurized water reactor (PWR) plant in Europe. For higher reliability and longer lifetime of PWR plant, MHI has conducted many kinds of maintenance works of main components of PWR plants in Japan against stress corrosion cracking due to aging degradation. Technical process for replacement of Pz safe end weld were established by MHI. MHI has experienced the work for 21 PWR units in Japan. That of Ringhals unit 3 was planned and conducted based on the experiences. In this work, Alloy 600 used for welds of nozzles of Pz was replaced with Alloy 690. Alloy 690 is more corrosive-resistant than Alloy 600. Specially designed equipment and technical process were developed and established by MHI to replace safe end weld of Pz and applied for the Ringhals unit 3 as a first application in Europe. The application had been performed in success and achieved the planned replacement work duration and total radiation dose by using sophisticated machining and welding equipment designed to meet the requirements to be small, lightweight and remote-controlled and operating by well skilled MHI personnel experienced in maintenance activities for major components of PWR plant in Japan. The success shows that the experience, activities and technology developed in Japan for main components of PWR plant shall be applicable to contribute reliable operations of nuclear power plants in Europe and other countries. (author)

  12. Design and simulation experimental study of bracket plates in steam generator for AC600 PWR

    International Nuclear Information System (INIS)

    Zhang Fuyuan; Zhang Wenqi; Ji Quankai; Zeng Xi; Xie Yongyao

    1998-01-01

    Seven-holes type bracket plate at the inlet nozzle and three-holes taper bracket plate at outlet nozzle are designed. According to 'local form and structure change' simulation theory, hydraulic models and simulators for the simulative experiments are designed. Taking water as the medium, the simulative experiments have been completed at the room temperature. The ζ-Re curves (here, ζ is the local pressure loss coefficient at the nozzles after the bracket plates are installed and Re is Reynolds number) have been got. Based on the experimental results, the computation and the analysis have been shown that. If the bracket plates are used in the steam generator (SG) of AC600 PWR, the pressure drop of primary side in the SG is about 14 percent higher than that of the 55/19 B style SG

  13. Modelling activity transport behavior in PWR plant

    International Nuclear Information System (INIS)

    Henshaw, Jim; McGurk, John; Dickinson, Shirley; Burrows, Robert; Hinds, Kelvin; Hussey, Dennis; Deshon, Jeff; Barrios Figueras, Joan Pau; Maldonado Sanchez, Santiago; Fernandez Lillo, Enrique; Garbett, Keith

    2012-09-01

    The activation and transport of corrosion products around a PWR circuit is a major concern to PWR plant operators as these may give rise to high personnel doses. The understanding of what controls dose rates on ex-core surfaces and shutdown releases has improved over the years but still several questions remain unanswered. For example the relative importance of particle and soluble deposition in the core to activity levels in the plant is not clear. Wide plant to plant and cycle to cycle variations are noted with no apparent explanations why such variations are observed. Over the past few years this group have been developing models to simulate corrosion product transport around a PWR circuit. These models form the basis for the latest version of the BOA code and simulate the movement of Fe and Ni around the primary circuit. Part of this development is to include the activation and subsequent transport of radioactive species around the circuit and this paper describes some initial modelling work in this area. A simple model of activation, release and deposition is described and then applied to explain the plant behaviour at Sizewell B and Vandellos II. This model accounts for activation in the core, soluble and particulate activity movement around the circuit and for activity capture ex-core on both the inner and outer oxides. The model gives a reasonable comparison with plant observations and highlights what controls activity transport in these plants and importantly what factors can be ignored. (authors)

  14. Safety considerations of PWR's

    International Nuclear Information System (INIS)

    Arnold, W.H. Jr.

    1977-01-01

    The safety of the central station pressurized water reactor is well established and substantiated by its excellent operating record. Operating data from 55 reactors of this type have established a record of safe operating history unparalleled by any modern large scale industry. The 186 plants under construction require a continuing commitment to maintain this outstanding record. The safety of the PWR has been further verified by the recently completed Reactor Safety Study (''Rasmussen'' Report). Not only has this study confirmed the exceptionally low risk associated with PWR operation, it has also introduced a valuable new tool in the decision making process. PWR designs, utilizing the philosophy of defense in depth, provide the bases for evaluating margins of safety. The design of the reactor coolant system, the containment system, emergency core cooling system and other related systems and components provide substantial margins of safety under both normal and postulated accident conditions even considering simultaneous effects of earthquakes and other environmental phenomena. Margins of safety in the assessment of various postulated accident conditions, with emphasis on the postulated loss of reactor coolant accident (LOCA), have been evaluated in depth as exemplified by the comprehensive ECCS rulemaking hearings followed by imposition of very conservative Nuclear Regulatory Commission requirements. When evaluated on an engineering best estimate approach, the significant margins to safety for a LOCA become more apparent. Extensive test programs have also substantiated margins to safety limits. These programs have included both separate effects and systems tests. Component testing has also been performed to substantiate performance levels under adverse combinations of environmental stress. The importance of utilizing past experience and of optimizing the deployment of incremental resources is self evident. Recent safety concerns have included specific areas such

  15. Sensitivity Verification of PWR Monitoring System Using Neuro-Expert For LOCA Detection

    International Nuclear Information System (INIS)

    Muhammad Subekti

    2009-01-01

    Sensitivity Verification of PWR Monitoring System Using Neuro-Expert For LOCA Detection. The present research was done for verification of previous developed method on Loss of Coolant Accident (LOCA) detection and perform simulations for knowing the sensitivity of the PWR monitoring system that applied neuro-expert method. The previous research continuing on present research, has developed and has tested the neuro-expert method for several anomaly detections in Nuclear Power Plant (NPP) typed Pressurized Water Reactor (PWR). Neuro-expert can detect the LOCA anomaly with sensitivity of primary coolant leakage of 7 gallon/min and the conventional method could not detect the primary coolant leakage of 30 gallon/min. Neuro expert method detects significantly LOCA anomaly faster than conventional system in Surry-1 NPP as well so that the impact risk is reducible. (author)

  16. Reactor analysis support package (RASP). Volume 7. PWR set-point methodology. Final report

    International Nuclear Information System (INIS)

    Temple, S.M.; Robbins, T.R.

    1986-09-01

    This report provides an overview of the basis and methodology requirements for determining Pressurized Water Reactor (PWR) technical specifications related setpoints and focuses on development of the methodology for a reload core. Additionally, the report documents the implementation and typical methods of analysis used by PWR vendors during the 1970's to develop Protection System Trip Limits (or Limiting Safety System Settings) and Limiting Conditions for Operation. The descriptions of the typical setpoint methodologies are provided for Nuclear Steam Supply Systems as designed and supplied by Babcock and Wilcox, Combustion Engineering, and Westinghouse. The description of the methods of analysis includes the discussion of the computer codes used in the setpoint methodology. Next, the report addresses the treatment of calculational and measurement uncertainties based on the extent to which such information was available for each of the three types of PWR. Finally, the major features of the setpoint methodologies are compared, and the principal effects of each particular methodology on plant operation are summarized for each of the three types of PWR

  17. Aging management of PWR reactor internals in U.S. plants

    International Nuclear Information System (INIS)

    Amberge, K.J.; Demma, A.

    2015-01-01

    This paper describes the development, aging management strategies and inspection results of the Pressurized Water Reactor (PWR) vessel internals inspection and evaluation guidelines. The goal of these guidelines is to provide PWR owners with robust aging management strategies to monitor degradation of internals components to support life extension as well as the current period of operation and power up-rate activities. The implementation of these guidelines began in 2010 within the U.S. PWR fleet and several examinations have been performed since. Examples of inspection results are presented for selected vessel internals components and are compared with simulation results. In summary, to date there have been no observations of austenitic stainless steel stress corrosion cracking (SCC), which is consistent with expectations based on the current understanding of the mechanism. Observations of irradiation assisted stress corrosion cracking (IASCC) have been limited and only found in baffle former bolting. Additionally, no macroscopic effects or global observations of void swelling impacts on general conditions of reactor internal hardware have been observed. (authors)

  18. PWR accident management realated tests: some Bethsy results

    International Nuclear Information System (INIS)

    Clement, P.; Chataing, T.; Deruaz, R.

    1993-01-01

    The BETHSY integral test facility which is a scaled down model of a 3 loop FRAMATOME PWR and is currently operated at the Nuclear Center of Grenoble, forms an important part of the French strategy for PWR Accident Management. In this paper the features of both the facility and the experimental program are presented. Two accident transients: a total loss of feedwater and a 2'' cold leg break in case of High Pressure Safety Injection System failure, involving either Event Oriented - or State Oriented-Emergency Operating Procedures (EO-EOP or SO-EOP) are described and the system response analyzed. CATHARE calculation results are also presented which illustrate the ability of this code to adequately predict the key phenomena of these transients. (authors). 13 figs., 11 refs., 2 tabs

  19. Seismic proving test of PWR reactor containment vessel

    International Nuclear Information System (INIS)

    Akiyama, H.; Yoshikawa, T.; Tokumaru, Y.

    1987-01-01

    The seismic reliability proving tests of nuclear power plant facilities are carried out by Nuclear Power Engineering Test Center (NUPEC), using the large-scale, high-performance vibration of Tadotsu Engineering Laboratory, and sponsored by the Ministry of International Trade and Industry (MITI). In 1982, the seismic reliability proving test of PWR containment vessel started using the test component of reduced scale 1/3.7 and the test component proved to have structural soundness against earthquakes. Subsequently, the detailed analysis and evaluation of these test results were carried out, and the analysis methods for evaluating strength against earthquakes were established. Whereupon, the seismic analysis and evaluation on the actual containment vessel were performed by these analysis methods, and the safety and reliability of the PWR reactor containment vessel were confirmed

  20. Report on the PWR-radiation protection/ALARA Committee

    Energy Technology Data Exchange (ETDEWEB)

    Malone, D.J. [Consumers Power Co., Covert, MI (United States)

    1995-03-01

    In 1992, representatives from several utilities with operational Pressurized Water Reactors (PWR) formed the PWR-Radiation Protection/ALARA Committee. The mission of the Committee is to facilitate open communications between member utilities relative to radiation protection and ALARA issues such that cost effective dose reduction and radiation protection measures may be instituted. While industry deregulation appears inevitable and inter-utility competition is on the rise, Committee members are fully committed to sharing both positive and negative experiences for the benefit of the health and safety of the radiation worker. Committee meetings provide current operational experiences through members providing Plant status reports, and information relative to programmatic improvements through member presentations and topic specific workshops. The most recent Committee workshop was facilitated to provide members with defined experiences that provide cost effective ALARA performance.

  1. PWR plant operator training used full scope simulator incorporated MAAP model

    International Nuclear Information System (INIS)

    Matsumoto, Y.; Tabuchi, T.; Yamashita, T.; Komatsu, Y.; Tsubouchi, K.; Banka, T.; Mochizuki, T.; Nishimura, K.; Iizuka, H.

    2015-01-01

    NTC makes an effort with the understanding of plant behavior of core damage accident as part of our advanced training. For the Fukushima Daiichi Nuclear Power Station accident, we introduced the MAAP model into PWR operator training full scope simulator and also made the Severe Accident Visual Display unit. From 2014, we will introduce new training program for a core damage accident with PWR operator training full scope simulator incorporated the MAAP model and the Severe Accident Visual Display unit. (author)

  2. Vibration behavior of PWR reactor internals Model experiments and analysis

    International Nuclear Information System (INIS)

    Assedo, R.; Dubourg, M.; Livolant, M.; Epstein, A.

    1975-01-01

    In the late 1971, the CEA and FRAMATOME decided to undertake a comprehensive joint program of studying the vibration behavior of PWR internals of the 900 MWe, 50 cycle, 3 loop reactor series being built by FRAMATOME in France. The PWR reactor internals are submitted to several sources of excitation during normal operation. Two main sources of excitation may effect the internals behavior: the large flow turbulences which could generate various instabilities such as: vortex shedding: the pump pressure fluctuations which could generate acoustic noise in the circuit at frequencies corresponding to shaft speed frequencies or blade passing frequencies, and their respective harmonics. The flow induced vibrations are of complex nature and the approach selected, for this comprehensive program, is semi-empirical and based on both theoretical analysis and experiments on a reduced scale model and full scale internals. The experimental support of this program consists of: the SAFRAN test loop which consists of an hydroelastic similitude of a 1/8 scale model of a PWR; harmonic vibration tests in air performed on full scale reactor internals in the manufacturing shop; the GENNEVILLIERS facilities which is a full flow test facility of primary pump; the measurements carried out during start up on the Tihange reactor. This program will be completed in April 1975. The results of this program, the originality of which consists of studying separately the effects of random excitations and acoustic noises, on the internals behavior, and by establishing a comparison between experiments and analysis, will bring a major contribution for explaining the complex vibration phenomena occurring in a PWR

  3. PWR decontamination feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Silliman, P.L.

    1978-12-18

    The decontamination work which has been accomplished is reviewed and it is concluded that it is worthwhile to investigate further four methods for decontamination for future demonstration. These are: dilute chemical; single stage strong chemical; redox processes; and redox/chemical in combination. Laboratory work is recommended to define the agents and processes for demonstration and to determine the effect of the solvents on PWR materials. The feasibility of Indian Point 1 for decontamination demonstrations is discussed, and it is shown that the system components of Indian Point 1 are well suited for use in demonstrations.

  4. PWR decontamination feasibility study

    International Nuclear Information System (INIS)

    Silliman, P.L.

    1978-01-01

    The decontamination work which has been accomplished is reviewed and it is concluded that it is worthwhile to investigate further four methods for decontamination for future demonstration. These are: dilute chemical; single stage strong chemical; redox processes; and redox/chemical in combination. Laboratory work is recommended to define the agents and processes for demonstration and to determine the effect of the solvents on PWR materials. The feasibility of Indian Point 1 for decontamination demonstrations is discussed, and it is shown that the system components of Indian Point 1 are well suited for use in demonstrations

  5. 14C Behaviour in PWR coolant

    International Nuclear Information System (INIS)

    Sims, Howard; Dickinson Shirley; Garbett, Keith

    2012-09-01

    Although 14 C is produced in relatively small amounts in PWR coolant, it is important to know its fate, for example whether it is released by gaseous discharge, removed by absorption on ion exchange (IX) resins or deposited on the fuel pin surfaces. 14 C can exist in a range of possible chemical forms: inorganic carbon compounds (probably mainly CO 2 ), elemental carbon, and organic compounds such as hydrocarbons. This paper presents results from a preliminary survey of the possible reactions of 14 C in PWR coolant. The main conclusions of the study are: - A combination of thermal and radiolytic reactions controls the chemistry of 14 C in reactor coolant. A simple chemical kinetic model predicts that CH 3 OH would be the initial product from radiolytic reactions of 14 C following its formation from 17 O. CH 3 OH is predicted to arise as a result of reactions of OH . with CH 4 and CH 3 , and it persists because there is no known radiation chemical reduction mechanism. - Thermodynamic considerations show that CH 3 OH can be thermally reduced to CH 4 in PWR conditions, although formation of CO 2 from small organics is the most thermodynamically favourable outcome. Such reactions could be catalysed on active nickel surfaces in the primary circuit. - Limited plant data would suggest that CH 4 is the dominant form in PWR and CO 2 in BWR. This implies that radiation chemistry may be important in determining the speciation. - Addition of acetate does not affect the amount of 14 C formed, but the addition of large amounts of stable carbon would lead to a large range of additional products, some of which would be expected to deposit on fuel pin surfaces as high molecular weight hydrocarbons. However, the subsequent thermal decomposition reactions of these products are not known. - Acetate addition may represent a small input of 12 C compared with organic material released from CVCS resins, although the importance of this may depend on whether that is predominantly soluble

  6. The increase in fatigue crack growth rates observed for Zircaloy-4 in a PWR environment

    Science.gov (United States)

    Cockeram, B. V.; Kammenzind, B. F.

    2018-02-01

    Cyclic stresses produced during the operation of nuclear reactors can result in the extension of cracks by processes of fatigue. Although fatigue crack growth rate (FCGR) data for Zircaloy-4 in air are available, little testing has been performed in a PWR primary water environment. Test programs have been performed by Gee et al., in 1989 and Picker and Pickles in 1984 by the UK Atomic Energy Authority, and by Wisner et al., in 1994, that have shown an enhancement in FCGR for Zircaloy-2 and Zircaloy-4 in high-temperature water. In this work, FCGR testing is performed on Zircaloy-4 in a PWR environment in the hydrided and non-hydrided condition over a range of stress-intensity. Measurements of crack extension are performed using a direct current potential drop (DCPD) method. The cyclic rate in the PWR primary water environment is varied between 1 cycle per minute to 0.1 cycle per minute. Faster FCGR rates are observed in water in comparison to FCGR testing performed in air for the hydrided material. Hydrided and non-hydrided materials had similar FCGR values in air, but the non-hydrided material exhibited much lower rates of FCGR in a PWR primary water environment than for hydrided material. Hydrides are shown to exhibit an increased tendency for cracking or decohesion in a PWR primary water environment that results in an enhancement in FCGR values. The FCGR in the PWR primary water only increased slightly with decreasing cycle frequency in the range of 1 cycle per minute to 0.1 cycle per minute. Comparisons between the FCGR in water and air show the enhancement from the PWR environment is affected by the applied stress intensity.

  7. Serious accidents of PWR type reactors for power generation

    International Nuclear Information System (INIS)

    2008-12-01

    This document presents the great lines of current knowledge on serious accidents relative to PWR type reactors. First, is exposed the physics of PWR type reactor core meltdown and the possible failure modes of the containment building in such a case. Then, are presented the dispositions implemented with regards to such accidents in France, particularly the pragmatic approach that prevails for the already built reactors. Then, the document tackles the case of the European pressurized reactor (E.P.R.), for which the dimensioning takes into account explicitly serious accidents: it is a question of objectives conception and their respect must be the object of a strict demonstration, by taking into account uncertainties. (N.C.)

  8. Monte Carlo based radial shield design of typical PWR reactor

    Energy Technology Data Exchange (ETDEWEB)

    Gul, Anas; Khan, Rustam; Qureshi, M. Ayub; Azeem, Muhammad Waqar; Raza, S.A. [Pakistan Institute of Engineering and Applied Sciences, Islamabad (Pakistan). Dept. of Nuclear Engineering; Stummer, Thomas [Technische Univ. Wien (Austria). Atominst.

    2016-11-15

    Neutron and gamma flux and dose equivalent rate distribution are analysed in radial and shields of a typical PWR type reactor based on the Monte Carlo radiation transport computer code MCNP5. The ENDF/B-VI continuous energy cross-section library has been employed for the criticality and shielding analysis. The computed results are in good agreement with the reference results (maximum difference is less than 56 %). It implies that MCNP5 a good tool for accurate prediction of neutron and gamma flux and dose rates in radial shield around the core of PWR type reactors.

  9. ASTEC-CATHARE2 benchmarks on French PWR 1300MWe reactors

    International Nuclear Information System (INIS)

    Tregoures, Nicolas; Philippot, Marc; Foucher, Laurent; Guillard, Gaetan; Fleurot, Joelle

    2009-01-01

    The French Institut de Radioprotection et de Surete Nucleaire (IRSN) is performing a level 2 Probabilistic Safety Assessment (PSA-2) on the French 1300 MWe reactors. This PSA-2 is heavily relying on the ASTEC integral computer code, jointly developed by IRSN and GRS (Germany). In order to assess the reliability and the quality of physical results of the ASTEC V1.3 code as well as the PWR 1300 MWe reference input deck, an important series of benchmarks with the French best-estimate thermal-hydraulic code CATHARE 2 V2.5 has been performed on 14 different severe accident scenarios. The present paper details 2 out of the 14 studied scenarios: a 12 inches cold leg Loss of Coolant Accident (LOCA) and a 2 tubes Steam Generator Tube Rupture (SGTR). The thermal-hydraulic behavior of the primary and secondary circuits is thoroughly investigated and the ASTEC results of the core degradation phase are presented. Overall, the thermal-hydraulic behavior given by the ASTEC V1.3 is in very good agreement with the CATHARE 2 V2.5 results. (author)

  10. Coupling crevice chemistry with a corrosion model in laboratory: A first application to the analysis of secondary side corrosion in service

    International Nuclear Information System (INIS)

    Pavageau, E.M.; Vaillant, D.; Dimpre, S.; Bouchacourt, M.; Millet, L.

    2002-01-01

    Secondary side corrosion of tubes in Alloy 600 develops in flow-restricted areas between tubes and tubesheet or tube support plates since pollutants of the secondary water can concentrate under heat flux. So EDF has undertaken an important effort of modeling the degradation (intergranular attack IGA and intergranular stress corrosion cracking IGSCC). Three models of corrosion are available or under development depending on the type of crevice environment that could be deduced from the analysis of secondary water and from pulled tube examinations: the first one in strongly alkaline environments (sodium hydroxide environments), the second one in sulfate environments, sulfate being one of the main species analyzed in water after hideout return, the third one in complex environments that could duplicate the deposits, films and degradation observed on pulled tubes. The crevice chemistry during operation was first evaluated using analyses of secondary water after hideout return and the MULTEQ code. The local chemical conditions were introduced into the corrosion model generated in laboratory and gave results which were compared to field experience. Encouraging results were found with the sodium hydroxide model for some of the old French plant units in the early period of operation. A similar approach is under investigation with the sulfate corrosion model for the entire time of operation and for the other plant units. (authors)

  11. Severe accident considerations for modern KWU-PWR plants

    International Nuclear Information System (INIS)

    Eyink, J.

    1987-01-01

    In assumption of severe accident on modern KWU-PWR plants the author discusses on the: selection of core meltdown sequences, course of the accident, containment behaviour and source terms for fission products release to the environment

  12. Deboration in nuclear stations of the PWR type

    International Nuclear Information System (INIS)

    1978-01-01

    Reactivity control in nuclear power stations of the PWR type is realised with boric acid. A method to concentrate boric acid without an evaporator has been studied. A flow-sheet with reverse osmosis is proposed. (author)

  13. Surface reactivity of colloidal corrosion product and alloys in PWR conditions

    International Nuclear Information System (INIS)

    Lefevre, Gregory; Leclercq, Stephanie; Cabanas, Bruna-Martin; Delaunay, Sophie; Mansour, Carine; Berger, Gilles

    2012-09-01

    The corrosion of metallic components of water circuits of Pressurized Water Reactors generates colloidal particles. These particles are transported in the circuits, they sorb dissolved species and they can deposit on alloys in given parts of the circuits. Sorption and deposition generate several technical drawbacks in both primary and secondary circuits. According to the DLVO theory, adhesion between two surfaces is controlled by electrostatic and Van der Waals forces. The latter are always attractive and does not depends on solution chemistry. On the contrary, electrostatic forces are connected to the surface charge and depend strongly on the chemical properties of the solids and on the chemistry of the solution. Depending on the relative charge of the surfaces, these forces are attractive or repulsive and can have a major effect on the deposition behavior of particles. According to the surface complexation theory, the surface charge of metallic oxides results from sorption or desorption of protons, leading to positive or negative surface sites, and thus, strongly depends on the solution pH. Dissolved species can sorb on the surface, depending on the ionic charge of these species and on the surface charge. Thus, the knowledge of the surface charge of corrosion particles and alloys, their affinity towards several ions as protons, nickel, cobalt, sulfate, or borate ions has been shown to be useful to predict the transport of the contamination in the primary circuit, or to understand the accumulation of impurities in the steam generator in the secondary circuit. At room temperature, these data can be easily measured, or found in literature. In PWR conditions (high temperature, high pressure), most of the usual protocols and commercial instruments cannot be used. For several years, collaboration between EDF R and D and CNRS has been developed to get information about the surface reactivity of iron oxides, ferrites, and alloys in such conditions. Some of the results

  14. Preliminary study of the economics of enriching PWR fuel with a fusion hybrid reactor

    International Nuclear Information System (INIS)

    Kelly, J.L.

    1978-09-01

    This study is a comparison of the economics of enriching uranium oxide for pressurized water reactor (PWR) power plant fuel using a fusion hybrid reactor versus the present isotopic enrichment process. The conclusion is that privately owned hybrid fusion reactors, which simultaneously produce electrical power and enrich fuel, are competitive with the gaseous diffusion enrichment process if spent PWR fuel rods are reenriched without refabrication. Analysis of irradiation damage effects should be performed to determine if the fuel rod cladding can withstand the additional irradiation in the hybrid and second PWR power cycle. The cost competitiveness shown by this initial study clearly justifies further investigations

  15. PSA LEVEL 3 DAN IMPLEMENTASINYA PADA KAJIAN KESELAMATAN PWR

    Directory of Open Access Journals (Sweden)

    Pande Made Udiyani

    2015-03-01

    Full Text Available Kajian keselamatan PLTN menggunakan metodologi kajian probabilistik sangat penting selain kajian deterministik. Metodologi kajian menggunakan Probabilistic Safety Assessment (PSA Level 3 diperlukan terutama untuk estimasi kecelakaan parah atau kecelakaan luar dasar desain PLTN. Metode ini banyak dilakukan setelah kejadian kecelakaan Fukushima. Dalam penelitian ini dilakukan implementasi PSA Level 3 pada kajian keselamatan PWR, postulasi kecelakan luar dasar desain PWR AP-1000 dan disimulasikan di contoh tapak Bangka Barat. Rangkaian perhitungan yang dilakukan adalah: menghitung suku sumber dari kegagalan teras yang terjadi, pemodelan kondisi meteorologi tapak dan lingkungan, pemodelan jalur paparan, analisis dispersi radionuklida dan transportasi fenomena di lingkungan, analisis deposisi radionuklida, analisis dosis radiasi, analisis perlindungan & mitigasi, dan analisis risiko. Kajian menggunakan rangkaian subsistem pada perangkat lunak PC Cosyma. Hasil penelitian membuktikan bahwa implementasi metode kajian keselamatan PSA Level 3 sangat efektif dan komprehensif terhadap estimasi dampak, konsekuensi, risiko, kesiapsiagaan kedaruratan nuklir (nuclear emergency preparedness, dan manajemen kecelakaan reaktor terutama untuk kecelakaan parah atau kecelakaan luar dasar desain PLTN. Hasil kajian dapat digunakan sebagai umpan balik untuk kajian keselamatan PSA Level 1 dan PSA Level 2. Kata kunci: PSA level 3, kecelakaan, PWR   Reactor safety assessment of nuclear power plants using probabilistic assessment methodology is most important in addition to the deterministic assessment. The methodology of Level 3 Probabilistic Safety Assessment (PSA is especially required to estimate severe accident or beyond design basis accidents of nuclear power plants. This method is carried out after the Fukushima accident. In this research, the postulations beyond design basis accidentsof PWR AP - 1000 would be taken, and simulated at West Bangka sample site. The

  16. Feasibility of using gadolinium as a burnable poison in PWR cores. Final report

    International Nuclear Information System (INIS)

    Rothleder, B.M.

    1981-02-01

    As an alternative to the use of lumped burnable absorbers in PWR cores, distributed burnable absorbers are being considered for generic application. These burnable absorbers take the form of Gd 2 O 3 mixed with UO 2 in selected fuel rods (as is currently done in BWR cores). The work discussed herein concerns a three-dimensional feasibility study of the use of such distributed burnable absorbers in PWR cores. This study of distributed burnable absorbers was performed for the first cycle of a typical current design PWR using the following steps: analysis of a generic reference core design; determination of gadolinium assembly designs; determination of a generic gadolinium core design; evaluation of feasibility by examining selected parameters; and redesign of the generic gadolinium core, using axial zoning

  17. Utilization of thorium in PWR type reactors

    International Nuclear Information System (INIS)

    Correa, F.

    1977-01-01

    Uranium 235 consumption is comparatively evaluated with thorium cycle for a PWR type reactor. Modifications are only made in fuels components. U-235 consumption is pratically unchanged in both cycles. Some good results are promised to the mixed U-238/Th-232 fuel cycle in 1/1 proportion [pt

  18. Preliminary safety analysis of the PWR with accident-tolerant fuels during severe accident conditions

    International Nuclear Information System (INIS)

    Wu, Xiaoli; Li, Wei; Wang, Yang; Zhang, Yapei; Tian, Wenxi; Su, Guanghui; Qiu, Suizheng; Liu, Tong; Deng, Yongjun; Huang, Heng

    2015-01-01

    Highlights: • Analysis of severe accident scenarios for a PWR fueled with ATF system is performed. • A large-break LOCA without ECCS is analyzed for the PWR fueled with ATF system. • Extended SBO cases are discussed for the PWR fueled with ATF system. • The accident-tolerance of ATF system for application in PWR is illustrated. - Abstract: Experience gained in decades of nuclear safety research and previous nuclear accidents direct to the investigation of passive safety system design and accident-tolerant fuel (ATF) system which is now becoming a hot research point in the nuclear energy field. The ATF system is aimed at upgrading safety characteristics of the nuclear fuel and cladding in a reactor core where active cooling has been lost, and is preferable or comparable to the current UO 2 –Zr system when the reactor is in normal operation. By virtue of advanced materials with improved properties, the ATF system will obviously slow down the progression of accidents, allowing wider margin of time for the mitigation measures to work. Specifically, the simulation and analysis of a large break loss of coolant accident (LBLOCA) without ECCS and extended station blackout (SBO) severe accident are performed for a pressurized water reactor (PWR) loaded with ATF candidates, to reflect the accident-tolerance of ATF

  19. Chemical decontamination solutions: Effects on PWR equipment

    International Nuclear Information System (INIS)

    Pezze, C.M.; Colvin, E.R.; Aspden, R.G.

    1992-01-01

    A critical objective for the nuclear industry is the reduction of personnel exposure to radiation. Reductions have been achieved through industry's radiation management programs including training and radiation awareness concepts. Increased plant maintenance and higher radiation fields at many sites continue to raise concerns. To alleviate the radiation exposure problem, the sources of radiation which contribute to personnel exposure must be removed from the plant. A feasible was of significantly reducing these sources from a Pressurized Water Reactor (PWR) is to chemically decontaminate the entire reactor coolant system (RCS). A program was conducted to determine the technical acceptability of using certain dilute chemical solvent processes for full RCS chemical decontamination. The two processes evaluated were CAN-DEREM and LOMI. The purpose of the program was to define and complete a systematic evaluation of the major issues that need to be addressed for the successful decontamination of the entire RCS and affected portions of the auxiliary systems of a four-loop PWR system. A test program was designed to evaluate the corrosion effects of the two decontamination processes under expected plant conditions. Materials and sample configurations dictated by generic PWR components were evaluated. The testing also included many standard corrosion coupons. The test data were then used to assess the impact of chemical decontamination on the physical condition and operability of the components, equipment and mechanical systems that make up the RCS. An overview of the test program, sample configurations, data and engineering evaluations is presented. The data demonstrate that through detailed engineering evaluations of corrosion data and equipment function, the impact of full RCS chemical decontamination on plant equipment is established

  20. A Feasibility Study on Core Cooling of Reduced-Moderation PWR for the Large Break LOCA

    International Nuclear Information System (INIS)

    Hiroyuki Yoshida; Akira Ohnuki; Hajime Akimoto

    2002-01-01

    A design study of a reduced-moderation water reactor (RMWR) with tight lattice core is being carried out at the Japan Atomic Energy Research Institute (JAERI) as one candidate for future reactors. The concept is developed to achieve a conversion ratio greater than unity using the tight lattice core (volume ratio of moderator to fuel is around 0.5 and the gap spacing between the fuel rods is remarkably narrower than in a reactor currently operated). Under such tight configuration, the core thermal margin becomes smaller and should be evaluated in a normal operation and also during the reflood phase in a large break loss-of-coolant accident (LBLOCA) for PWR type reactors. In this study, we have performed a feasibility evaluation on core cooling of reduced moderation PWR for the LBLOCA (200% break). The evaluation was performed for the primary system after the break by the REFLA/TRAC code. The core thermal output of the reduced moderation PWR is 2900 MWt, the gap between adjacent fuel rods is 1 mm, and heavy water is used as the moderator and coolant. The present design adopts seed fuel assemblies (MOX fuel) and several blanket fuel assemblies. In the blanket fuel assemblies, power density is lower than that of the seed fuel assemblies. Then, we set a channel box to each fuel assembly in order to adjust the flow rate in each assembly, because the possibility that the coolant boils in the seed fuel assemblies is very high. The pressure vessel diameter is bigger in comparison with a current PWR and core height is smaller than the current one. The current 4-loop PWR system is used, and, however, to fit into the bigger pressure vessel volume (about 1.5 times), we set up the capacity of the accumulator (1.5 times of the current PWR). Although the maximum clad temperature reached at about 1200 K in the position of 0.6 m from the lower core support plate, it is sufficiently lower than the design criteria of the current PWR (1500 K). The core cooling of the reduced moderation

  1. Changes in 900 MW PWR alarm processing policy

    Energy Technology Data Exchange (ETDEWEB)

    Pont, M [Electricite de France, Generation and Transmission, Nuclear Power Plant Operations, Paris (France)

    1997-09-01

    Following a brief description of the current 900 MW PWR alarm processing system, this document presents the feasibility study carried out within the scope of the Instrumentation and Control Refurbishment project (R2C). (author). 4 figs, tabs.

  2. Changes in 900 MW PWR alarm processing policy

    International Nuclear Information System (INIS)

    Pont, M.

    1997-01-01

    Following a brief description of the current 900 MW PWR alarm processing system, this document presents the feasibility study carried out within the scope of the Instrumentation and Control Refurbishment project (R2C). (author). 4 figs, tabs

  3. CFD simulation of a four-loop PWR at asymmetric operation conditions

    Energy Technology Data Exchange (ETDEWEB)

    Cheng, Jian-Ping; Yan, Li-Ming; Li, Feng-Chen, E-mail: lifch@hit.edu.cn

    2016-04-15

    Highlights: • A CFD numerical simulation procedure was established for simulating RPV of VVER-1000. • The established CFD approach was validated by comparing with available data. • Thermal hydraulic characteristics under asymmetric operation condition were investigated. • Apparent influences of the shutdown loop on its neighboring loops were obtained. - Abstract: The pressurized water reactor (PWR) with multiple loops may have abnormal working conditions with coolant pumps out of running in some loops. In this paper, a computational fluid dynamics (CFD) numerical study of the four-loop VVER-1000 PWR pressure vessel model was presented. Numerical simulations of the thermohydrodynamic characteristics in the pressure vessel were carried out at different inlet conditions with four and three loops running, respectively. At normal stead-state condition (four-loop running), different parameters were obtained for the full fluid domain, including pressure losses across different parts, pressure, velocity and temperature distributions in the reactor pressure vessel (RPV) and mass flow distribution of the coolant at the inlet of reactor core. The obtained results for pressure losses matched with the experimental reference values of the VVER-1000 PWR at Tianwan nuclear power plant (NPP). For most fuel assemblies (FAs), the inlet flow rates presented a symmetrical distribution about the center under full-loop operation conditions, which accorded with the practical distribution. These results indicate that it is now possible to study the dynamic transition process between different asymmetric operation conditions in a multi-loop PWR using the established CFD method.

  4. Condensate polishing guidelines for PWR and BWR plants

    International Nuclear Information System (INIS)

    Robbins, P.; Crinigan, P.; Graham, B.; Kohlmann, R.; Crosby, C.; Seager, J.; Bosold, R.; Gillen, J.; Kristensen, J.; McKeen, A.; Jones, V.; Sawochka, S.; Siegwarth, D.; Keeling, D.; Polidoroff, T.; Morgan, D.; Rickertsen, D.; Dyson, A.; Mills, W.; Coleman, L.

    1993-03-01

    Under EPRI sponsorship, an industry committee, similar in form and operation to other guideline committees, was created to develop Condensate Polishing Guidelines for both PWR and BWR systems. The committee reviewed the available utility and water treatment industry experience on system design and performance and incorporated operational and state-of-the-art information into document. These guidelines help utilities to optimize present condensate polisher designs as well as be a resource for retrofits or new construction. These guidelines present information that has not previously been presented in any consensus industry document. The committee generated guidelines that cover both deep bed and powdered resin systems as an integral part of the chemistry of PWR and BWR plants. The guidelines are separated into sections that deal with the basis for condensate polishing, system design, resin design and application, data management and performance and management responsibilities

  5. EDF/CIDEN - ONECTRA: PWR decontamination

    International Nuclear Information System (INIS)

    Fayolle, P.; Orcel, H.; Wertz, L.

    2010-01-01

    In the context of PWR circuit renewal (expected in 2011) and their decontamination, an analysis of data coming from cartography and on site decontamination measurements as well as from premise modelling by means of the PANTHERE radioprotection code, is presented. Several French PWRs have been studied. After a presentation of code principles and operation, the authors discuss the radiological context of a workstation, and give an assessment of the annual dose associated with maintenance operations with or without decontamination

  6. Corrosion of PWR steam generators

    International Nuclear Information System (INIS)

    Garnsey, R.

    1979-01-01

    Some designs of pressurized water reactor (PWR) steam generators have experienced a variety of corrosion problems which include stress corrosion cracking, tube thinning, pitting, fatigue, erosion-corrosion and support plate corrosion resulting in 'denting'. Large international research programmes have been mounted to investigate the phenomena. The operational experience is reviewed and mechanisms which have been proposed to explain the corrosion damage are presented. The implications for design development and for boiler and feedwater control are discussed. (author)

  7. PWR system reliability improvement activities

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1985-01-01

    In Japan lacking in energy resources, it is our basic energy policy to accelerate the development program of nuclear power, thereby reducing our dependence. As referred to in the foregoing, every effort has been exerted on our part to improve the PWR system reliability by dint of the so-called 'HOMEMADE' TQC activities, which is our brain-child as a result of applying to the energy industry the quality control philosophy developed in the field of manufacturing industry

  8. Additives for pH control in PWR secondary water

    International Nuclear Information System (INIS)

    Cobble, J.W.; Turner, P.J.

    1985-08-01

    The purpose of this project is the development of methods for identifying the most promising materials for use as pH control agents in steam generator and auxiliary hot water systems. The methods developed in the first project year to select new pH control agents have been explored in more detail in an effort to assess and improve their reliability. In addition, some new classes of compounds which were not treatable before have been examined on the basis of new experimental results. Predictions of pH and volatility to 300 0 C have now been made for a total of 79 organic bases. Some of the newer classes of compounds studied present properties which may make them of interest either as secondary additives or as principal agents in the event of change in the approach to water treatment. While there have been no substantial changes in number of compounds which meet all EPRI criteria, there are other species which may meet the EPRI criteria after further research. 19 refs., 31 tabs

  9. Depletion of gadolinium burnable poison in a PWR assembly with high burnup fuel

    Energy Technology Data Exchange (ETDEWEB)

    Refeat, Riham Mahmoud [Nuclear and Radiological Regulatory Authority (NRRA), Cairo (Egypt). Safety Engineering Dept.

    2015-12-15

    A tendency to increase the discharge burnup of nuclear fuel for Advanced Pressurized Water Reactors (PWR) has been a characteristic of its operation for many years. It will be able to burn at very high burnup of about 70 GWd/t with UO{sub 2} fuels. The U-235 enrichment must be higher than 5 %, which leads to the necessity of using an extremely efficient burnable poison like Gadolinium oxide. Using gadolinium isotope is significant due to its particular depletion behavior (''Onion-Skin'' effect). In this paper, the MCNPX2.7 code is used to calculate the important neutronic parameters of the next generation fuels of PWR. K-infinity, local peaking factor and fission rate distributions are calculated for a PWR assembly which burn at very high burnup reaching 70 GWd/t. The calculations are performed using the recently released evaluated Gadolinium cross section data. The results obtained are close to those of a LWR next generation fuel benchmark problem. This demonstrates that the calculation scheme used is able to accurately model a PWR assembly that operates at high burnup values.

  10. Advection within side-by-side liquid micro-cylinders in a cross-flow

    Science.gov (United States)

    Dong, Qingming; Sau, Amalendu

    2017-11-01

    The gaseous SO2 entrainment from outer air stream and dispersion in binary and ternary liquid micro-cylinders appearing side-by-side are examined hereby. The separation/attachment regulated non-uniform interfacial momentum exchange creates main stream driven "primary" and shear reversed "secondary" vortices in the liquid cylinders. At separation points, the sense of rotation of the generated "primary-secondary" vortex pair remains inward directed. We define such a vortex pair as the "inflow" type. However, at stagnation or attachment points, the sense of rotation of a "primary-primary" or "secondary-secondary" vortex pair remains outward directed, and such a vortex pair is defined as the "outflow" type. For the coupled water cylinders facing an oncoming stream contaminated by gaseous SO2, its absorption and internal transport are effectively controlled by dominant "inflow" and "outflow" natured dynamics of the said vortex pairs, besides by diffusion. The evolving "inflow" natured "primary-secondary" vortex pairs at separation points actively entrain the outer SO2, whereas the "outflow" natured vortex-pairs oppose SO2 entry through the stagnation regions. Moreover, the blockage induced steady-symmetric, steady-deflected, and flip-flopping air-jets through gaps, for varied gap-ratio (1 ≤ G/R ≤ 4) and Reynolds number (30 ≤ Re ≤ 160), create distinctive impact both on quantitative SO2 absorption (mso2 ') and convective nature of the SO2 transport in upper, lower, and middle cylinders, by virtue of modified strength and size of the inflow and outflow paired vortices. The present study shows that the tiny "secondary vortices" play important roles in SO2 entrainment and in effectively controlling the local absorption rate Rs o2. The sudden acceleration and upward/downward deflection of gap-flows enhanced near-neck advective SO2 entrainment by suitably strengthening the "inflow" natured local vortex dynamics. Conversely, for the reduced size of secondary vortices

  11. Construction of PWR nuclear cross sections for transient calculations. Test of the ANTI program against TWODIM

    International Nuclear Information System (INIS)

    Thorlaksen, B.

    1981-05-01

    Nuclear cross sections for fuel assemblies of the more recent Westinghouse designs, representing two different PWR reactor cores, are calculated as functions of average fuel temperature, moderator density, and moderator poison concentration. The cross-section functions are verified by referring to Westinghouse power-shape calculations and other analysis. Computations on the side reflector resulted in significantly higher albedo values than used previously for BWR's in similar nodal codes. This led to an investigation of the influence of the internodal coupling coefficients on the power shape. It is concluded that the calculated power shape is strongly dependent, on the choise of coupling coefficients. However, it is shown that ''the correct'' set of coupling coefficients depends mostly on the nodal configuration, and that it is fairly independent of the power condition. (author)

  12. The development of emergency core cooling systems in the PWR, BWR, and HWR Candu type of nuclear power plants

    International Nuclear Information System (INIS)

    Mursid Djokolelono.

    1976-01-01

    Emergency core cooling systems in the PWR, BWR, and HWR-Candu type of nuclear power plant are reviewed. In PWR and BWR the emergency cooling can be catagorized as active high pressure, active low pressure, and a passive one. The PWR uses components of the shutdown cooling system: whereas the BWR uses components of pressure suppression contaiment. HWR Candu also uses the shutdown cooling system similar to the PWR except some details coming out from moderator coolant separation and expensive cost of heavy water. (author)

  13. Scope and procedures of fuel management for PWR nuclear power plant

    International Nuclear Information System (INIS)

    Yao Zenghua

    1997-01-01

    The fuel management scope of PWR nuclear power plant includes nuclear fuel purchase and spent fuel disposal, ex-core fuel management, in-core fuel management, core management and fuel assembly behavior follow up. A suit of complete and efficient fuel management procedures have to be created to ensure the quality and efficiency of fuel management work. The hierarchy of fuel management procedure is divided into four levels: main procedure, administration procedure, implement procedure and technic procedure. A brief introduction to the fuel management scope and procedures of PWR nuclear power plant are given

  14. Electrical and control aspects of the Sizewell B PWR

    International Nuclear Information System (INIS)

    1992-01-01

    The pressurized water reactor, Sizewell-B, which is being built in Suffolk is well on in its construction schedule. This conference looked at the electrical and control aspects of the first PWR to be built in the United Kingdom. Although based on the standard Westinghouse PWR design, modifications have been made to meet the particular requirements of the site and the UK licensing regulations. There are 11 papers on all aspects of the electrical systems, 5 papers on the cables and cable installation, 5 on the main control rooms and auxiliary shutdown room, 5 on the integrated system and centralised operation, 6 on the monitoring and protection systems and 9 on the reactor protection systems. All 41 are indexed separately. (UK)

  15. Assessment of PWR plutonium burners for nuclear energy centers

    International Nuclear Information System (INIS)

    Frankel, A.J.; Shapiro, N.L.

    1976-06-01

    The purpose of the study was to explore the performance and safety characteristics of PWR plutonium burners, to identify modifications to current PWR designs to enhance plutonium utilization, to study the problems of deploying plutonium burners at Nuclear Energy Centers, and to assess current industrial capability of the design and licensing of such reactors. A plutonium burner is defined to be a reactor which utilizes plutonium as the sole fissile addition to the natural or depleted uranium which comprises the greater part of the fuel mass. The results of the study and the design analyses performed during the development of C-E's System 80 plant indicate that the use of suitably designed plutonium burners at Nuclear Energy Centers is technically feasible

  16. Development of a hybrid safety system: Actuation of the secondary automatic depressurization system at an early stage

    International Nuclear Information System (INIS)

    Nishimoto, Masae; Umezawa, Shigemitsu; Okabe, Kazuharu; Matsuoka, Tsuyoshi

    1996-01-01

    A Hybrid Safety System, which is an optimum combination of active and passive safety systems, has been developed in order to improve the safety, reliability and economic features of the next generation of PWRs. The passive safety systems include Automatic primary Depressurization System (ADS), Secondary Automatic Depressurization System (SADS), advanced accumulators, gravity injection system and so on. In this study the authors have improved the actuation logic of the passive safety systems. The original logic in the previous study actuates ADS at an early stage of an event such as a Loss-of-Coolant Accident (LOCA), and this is followed by the actuation of SADS. In this study they divide SADS into two systems. The first, small SADS, uses small valves corresponding to the relief valves of the conventional PWR plants. The second, large SADS, corresponds to the original SADS using multiple valves of large capacity. With the new logic, the passive systems are actuated during a typical small LOCA. Small LOCA analyses using several break areas were performed for a 1,400 MWe PWR plant with a Hybrid Safety System. The results predict that core uncovery does not occur in the case of a relatively small break area and that core heat removal during a small LOCA is improved in comparison with the analyses for conventional PWR plants, where the secondary pressure remains higher during the event. The results also predict that this new logic make it possible to reduce the ADS valve size and the actuation pressure setpoint of the passive safety systems

  17. ORIGEN-2 libraries based on JENDL-3.2 for PWR-MOX fuel

    Energy Technology Data Exchange (ETDEWEB)

    Matsumoto, Hideki; Onoue, Masaaki; Tahara, Yoshihisa [Mitsubishi Heavy Industries Ltd., Tokyo (Japan)

    2001-08-01

    A set of ORIGEN-2 libraries for PWR MOX fuel was developed based on JENDL-3.2 in the Working Group on Evaluation of Nuclide Production, Japanese Nuclear Data Committee. The calculational model generating ORIGEN-2 libraries of PWR MOX is explained here in detail. The ORIGEN-2 calculation with the new ORIGEN-2 MOX library can predict the nuclides contents within 10% for U and Pu isotopes and 20% for both minor actinides and main FPs. (author)

  18. Bias identification in PWR pressurizer instrumentation using the generalized liklihood-ratio technique

    International Nuclear Information System (INIS)

    Tylee, J.L.

    1981-01-01

    A method for detecting and identifying biases in the pressure and level sensors of a pressurized water reactor (PWR) pressurizer is described. The generalized likelihood ratio (GLR) technique performs statistical tests on the innovations sequence of a Kalman filter state estimator and is capable of determining when a bias appears, in what sensor the bias exists, and estimating the bias magnitude. Simulation results using a second-order linear, discrete PWR pressurizer model demonstrate the capabilities of the GLR method

  19. Dose rate evaluation after accident in a PWR

    International Nuclear Information System (INIS)

    Cladel, C.; Duchemin, B.; Le Dieu de Ville, A.; Nimal, B.; Nimal, J.C.; Evrard, J.M.

    1983-05-01

    A calculation scheme for the gamma radiation dose rate after accident in a PWR is presented. These studies use a fine description of the geometry and of the fission product inventory. Some results are given and some improvements are planned

  20. Assessment of TRAC-PF1/MOD1 code for large break LOCA in PWR

    International Nuclear Information System (INIS)

    Akimoto, Hajime; Ohnuki, Akira; Murao, Yoshio; Abe, Yutaka.

    1993-03-01

    As the first step of the REFLA/TRAC code development, the TRAC/PF1/MOD1 code has been assessed for various experiments that simulate postulated large-break loss-of-coolant accident (LBLOCA) in PWR to understand the predictive capability and to identify the problem areas of the code. The assessment calculations were performed for separate effect tests for critical flow, counter current flow, condensation at cold leg and reflood as well as integral tests to understand predictability for individual phenomena. This report summarizes results from the assessment calculations of the TRAC-PF1/MOD1 code for LBLOCA in PWR. The assessment calculations made clear the predictive capability and problem areas of the TRAC-PF1/MOD1 code for LBLOCA in PWR. The areas, listed below, should be improved for more realistic and effective simulation of LBLOCA in PWR: (1) core heat transfer model during blowdown, (2) ECC bypass model at downcomer during refill, (3) condensation model during accumulator injection, and (4) core thermal hydraulic model during reflood. (author) 57 refs

  1. Qualification test of chemical cleaning for secondary side of steam generator in Qinshan Nuclear Power Plant

    International Nuclear Information System (INIS)

    Zhang Mengqin; Zhang Shufeng; Yu Jinghua; Hou Shufeng

    1997-07-01

    The chemical cleaning technique for removing sludge on the secondary side in Qinshan Nuclear Power Plant has been qualified. The chemical cleaning process will carry out during shutdown refuelling. The qualification test has studied the effect of chemical cleaning agent component, cleaning time on dissolution effectiveness of sludge (Fe 3 O 4 ) and to evaluate corrosion situation of main materials of SG in the cleaning process. The main component of cleaning agent is EDTA. The cleaning temperature is 20∼30 degree C. It is determined that allowable remains amount of cleaning agent (EDTA). The technique of cleaning, rinse, passivation for the chemical cleaning in Qinshan Nuclear Power Plant has been made. The qualification test shown that the technique can dissolve Fe 3 O 4 >1 g/L, the corrosion of materials is in allowable value, the allowable remains of EDTA is <0.01%. The technique character is static, ambient temperature. (9 refs., 12 tabs.)

  2. PWR core design calculations

    Energy Technology Data Exchange (ETDEWEB)

    Trkov, A; Ravnik, M; Zeleznik, N [Inst. Jozef Stefan, Ljubljana (Slovenia)

    1992-07-01

    Functional description of the programme package Cord-2 for PWR core design calculations is presented. Programme package is briefly described. Use of the package and calculational procedures for typical core design problems are treated. Comparison of main results with experimental values is presented as part of the verification process. (author) [Slovenian] Opisali smo programski paket CORD-2, ki se uporablja pri projektnih izracunih sredice pri upravljanju tlacnovodnega reaktorja. Prikazana je uporaba paketa in racunskih postopkov za tipicne probleme, ki nastopajo pri projektiranju sredice. Primerjava glavnih rezultatov z eksperimentalnimi vrednostmi je predstavljena kot del preveritvenega procesa. (author)

  3. A comparison of in-vessel behaviors between SFR and PWR under severe accident

    Energy Technology Data Exchange (ETDEWEB)

    Park, Sanggil; Cho, Cheon Hwey [ACT Co., Daejeon (Korea, Republic of); Kim, Sang Ji [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    This paper aims to provide an easy guide for experts who know well the severe accident phenomenology of Pressurized Water Reactor (PWR) by comparing both reactor design concepts and in vessel behaviors under a postulated severe accident condition. This study only provides a preliminary qualitative comparison based on available literature. The PWR and SFR in-vessel design concepts and their effects under a postulate severe accident are investigated in this paper. Although this work is a preliminary study to compare the in-vessel behaviors for both PWR and SFR, it seems that there is no possibility to lead a significant core damage in the metal fuel SFR concept. In the oxide fuel SFR, there might be a chance to progress to the severe accident initiators such as the energetic reaction, flow blockage and so on.

  4. ROX PWR

    International Nuclear Information System (INIS)

    Akie, H.; Yamashita, T.; Shirasu, N.; Takano, H.; Anoda, Y.; Kimura, H.

    1999-01-01

    For an efficient burnup of excess plutonium from nuclear reactors spent fuels and dismantled warheads, plutonium rock-like oxide(ROX) fuel has been investigated. The ROX fuel is expected to provide high Pu transmutation capability, irradiation stability and chemical and geological stability. While, a zirconia-based ROX(Zr-ROX)-fueled PWR core has some problems of Doppler reactivity coefficient and power peaking factor. For the improvement of these characteristics, two approaches were considered: the additives such as UO 2 , ThO 2 and Er 2 O 3 , and a heterogeneous core with Zr-ROX and UO 2 assemblies. As a result, the additives UO 2 + Er 2 O 3 are found to sufficiently improve the reactivity coefficients and accident behavior, and to flatten power distribution. On the other hand, in the 1/3Zr-ROX + 2/3UO 2 heterogeneous core, further reduction of power peaking seems necessary. (author)

  5. Pressure loss coefficient and flow rate of side hole in a lower end plug for dual-cooled annular nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    Shin, Chang-Hwan, E-mail: shinch@kaeri.re.kr; Park, Ju-Yong, E-mail: juyong@kaeri.re.kr; In, Wang-Kee, E-mail: wkin@kaeri.re.kr

    2013-12-15

    Highlights: • A lower end plug with side flow holes is suggested to provide alternative flow paths of the inner channel. • The inlet loss coefficient of the lower end plug is estimated from the experiment. • The flow rate through the side holes is estimated in a complete entrance blockage of inner channel. • The consequence in the reactor core condition is evaluated with a subchannel analysis code. - Abstract: Dual-cooled annular nuclear fuel for a pressurized water reactor (PWR) has been introduced for a significant increase in reactor power. KAERI has been developing a dual-cooled annular fuel for a power uprate of 20% in an optimized PWR in Korea, the OPR1000. This annular fuel can help decrease the fuel temperature substantially relative to conventional cylindrical fuel at a power uprate. Annular fuel has dual flow channels around itself; however, the inner flow channel has a weakness in that it is isolated unlike the outer flow channel, which is open to other neighbouring outer channels for a coolant exchange in the reactor core. If the entrance of the inner channel is, as a hypothetical event, completely blocked by debris, the inner channel will then experience a rapid increase in coolant temperature such that a departure from nucleate boiling (DNB) may occur. Therefore, a remedy to avoid such a postulated accident is indispensable for the safety of annular fuel. A lower end plug with side flow holes was suggested to provide alternative flow paths in addition to the central entrance of the inner channel. In this paper, the inlet loss coefficient of the lower end plug and the flow rate through the side holes were estimated from the experimental results even in a complete entrance blockage of the inner channel. An optimization for the side hole was also performed, and the results are applied to a subchannel analysis to evaluate the consequence in the reactor core condition.

  6. RCC-C: Design and construction rules for fuel assemblies of PWR nuclear power plants

    International Nuclear Information System (INIS)

    2015-01-01

    The RCC-C code contains all the requirements for the design, fabrication and inspection of nuclear fuel assemblies and the different types of core components (rod cluster control assemblies, burnable poison rod assemblies, primary and secondary source assemblies and thimble plug assemblies). The design, fabrication and inspection rules defined in RCC-C leverage the results of the research and development work pioneered in France, Europe and worldwide, and which have been successfully used by industry to design and build nuclear fuel assemblies and incorporate the resulting feedback. The code's scope covers: fuel system design, especially for assemblies, the fuel rod and associated core components, the characteristics to be checked for products and parts, fabrication methods and associated inspection methods. The RCC-C code is used by the operator of the PWR nuclear power plants in France as a reference when sourcing fuel from the world's top two suppliers in the PWR market, given that the French operator is the world's largest buyer of PWR fuel. Fuel for EPR projects is manufactured according to the provisions of the RCC-C code. The code is available in French and English. The 2005 edition has been translated into Chinese. Contents of the 2015 edition of the RCC-C code: Chapter 1 - General provisions: 1.1 Purpose of the RCC-C, 1.2 Definitions, 1.3 Applicable standards, 1.4 Equipment subject to the RCC-C, 1.5 Management system, 1.6 Processing of non-conformances; Chapter 2 - Description of the equipment subject to the RCC-C: 2.1 Fuel assembly, 2.2 Core components; Chapter 3 - Design: Safety functions, operating functions and environment of fuel assemblies and core components, design and safety principles; Chapter 4 - Manufacturing: 4.1 Materials and part characteristics, 4.2 Assembly requirements, 4.3 Manufacturing and inspection processes, 4.4 Inspection methods, 4.5 Certification of NDT inspectors, 4.6 Characteristics to be inspected for the

  7. Earthquake resistance of residual heat removed (RHR) pump for pressurized water reactors (PWR)

    International Nuclear Information System (INIS)

    Uga, Takeo; Shiraki, K.; Honma, T.; Matsubayashi, H.; Inazuka, H.

    1980-01-01

    The present paper deals with the earthquake resistance of the residual heat removed (RHR) pump of single stage double volute type, which is one of the structurally simplest pumps used for pressurized water reactors (PWR). The results of the study can be summarized as follows: (1) Any trouble which can give effect on the functions of the pump at earthquake does not become a problem so long as each part of the pump is of aseismatically rigid structure. (2) Aseismatic tolerance test in the pump's operating condition has shown that the earthquake resistance of the pump at its location has a tolerance about five times the dynamic design acceleration. (3) The pump is provided with an impeller-casing wear ring at the pressure boundary between the suction side pressure and discharge side pressure. This wear ring acts as an underwater bearing when the pump is in operation, and improves the vibration characteristics, particularly damping ratio, of the pump shaft to a great extent to make the pump more aseismatic. (4) In the evaluation of the underwater bearing characteristics of the wear ring, the evaluation accuracy of the vibration characteristics of the pump shaft can be improved by taking into consideration the pressure loss in the wear ring part from the head of the single stage of the pump due to the rotation of the impeller. (author)

  8. PWR reactors for BBR nuclear power plants

    International Nuclear Information System (INIS)

    Structure and functioning of the nuclear steam generator system developed by BBR and its components are described. Auxiliary systems, control and load following behaviour and fuel management are discussed and the main data of PWR given. The brochure closes with a perspective of the future of the Muelheim-Kaerlich nuclear power plant. (GL) [de

  9. Integral type small PWR with stand-alone safety

    International Nuclear Information System (INIS)

    Makihara, Yoshiaki

    2001-01-01

    A feasibility study is achieved on an integral type small PWR with stand-alone safety. It is designed to have the following features. (1) The coolant does not leak out at any accidental condition. (2) The fuel failure does never occur while it is supposed on the large scale PWR at the design base accident. (3) At any accidental condition the safety is secured without any support from the outside (stand-alone safety secure). (4) It has self-regulating characteristics and easy controllability. The above features can be satisfied by integrate the steam generator and CRDM in the reactor vessel while the pipe line break has to be considered on the conventional PWR. Several counter measures are planned to satisfy the above features. The economy feature is also attained by several simplifications such as (1) elimination of main coolant piping and pressurizer by the integration of primary cooling system and self-pressurizing, (2) elimination of RCP by application of natural circulating system, (3) elimination of ECCS and accumulator by application of static safety system, (4) large scale volume reduction of the container vessel by application of integrated primary cooling system, (5) elimination of boric acid treatment by deletion of chemical shim. The long operation period such as 10 years can be attained by the application of Gd fuel in one batch refueling. The construction period can be shortened by the standardizing the design and the introduction of modular component system. Furthermore the applicability of the reduced modulation core is also considered. (K. Tsuchihashi)

  10. Plutonium recycle in PWR reactors (Brazilian Nuclear Program)

    International Nuclear Information System (INIS)

    Rubini, L.A.

    1978-02-01

    An evaluation is made of the material requirements of the nuclear fuel cycle with plutonium recycle. It starts from the calculation of a reference reactor and allows the evaluation of demand under two alternatives of nuclear fuel cycle for Pressurized Water Reactors (PWR): without plutonium recycle; and with plutonium recycle. Calculations of the reference reactor have been carried out with the CELL-CORE codes. For plutonium recycle, the concept of uranium and plutonium homogeneous mixture has been adopted, using self-produced plutonium at equilibrium, in order to get minimum neutronic perturbations in the reactor core. The refueling model studied in the reference reactor was the 'out-in' scheme with a constant number of changed fuel elements (approximately 1/3 of the core). Variations in the material requirements were studied considering changes in the installed nuclear capacity of PWR reactors, the capacity factor of these reactors, and the introduction of fast breeders. Recycling plutonium produced inside the system can reach economies of about 5%U 3 O 8 and 6% separative work units if recycle is assumed only after the 5th operation cycle of the thermal reactors. The cumulative amount of fissile plutonium obtained by the Brazilian Nuclear Program of PWR reactors by 1991 should be sufficient for a fast breeder with the same capacity as Angra 2. For the proposed fast breeder programs, the fissile plutonium produced by thermal reactors is sufficient to supply fast breeder initial necessities. Howewer, U 3 O 8 and SWU economy with recycle is not significant when the proposed fast breeder program is considered. (Author) [pt

  11. BWR and PWR chemistry operating experience and perspectives

    International Nuclear Information System (INIS)

    Fruzzetti, K.; Garcia, S.; Lynch, N.; Reid, R.

    2014-01-01

    It is well recognized that proper control of water chemistry plays a critical role in ensuring the safe and reliable operation of Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs). State-of-the-art water chemistry programs reduce general and localized corrosion of reactor coolant system, steam cycle equipment, and fuel cladding materials; ensure continued integrity of cycle components; and reduce radiation fields. Once a particular nuclear plant component has been installed or plant system constructed, proper water chemistry provides a global tool to mitigate materials degradation problems, thereby reducing the need for costly repairs or replacements. Recognizing the importance of proper chemistry control and the value in understanding the relationship between chemistry guidance and actual operating experience, EPRI continues to collect, monitor, and evaluate operating data from BWRs and PWRs around the world. More than 900 cycles of valuable BWR and PWR operating chemistry data has been collected, including online, startup and shutdown chemistry data over more than 10 years (> 20 years for BWRs). This paper will provide an overview of current trends in BWR and PWR chemistry, focusing on plants in the U.S.. Important chemistry parameters will be highlighted and discussed in the context of the EPRI Water Chemistry Guidelines requirements (i.e., those parameters considered to be of key importance as related to the major goals identified in the EPRI Guidelines: materials integrity; fuel integrity; and minimizing plant radiation fields). Perspectives will be provided in light of recent industry initiatives and changes in the EPRI BWR and PWR Water Chemistry Guidelines. (author)

  12. Workers doses in central European PWR NPPs

    International Nuclear Information System (INIS)

    Janzekovic, H.; Krizman, M.

    2003-01-01

    As is stated, the ISOE database which was established in 1992 forms an excellent basis for studies and comparisons of occupational exposure data between nuclear power plants. In the year 2001, 69% of all participating reactors were pressurised water reactors. The ISOE database presents workers' exposure from 213 participating pressurised reactors (PWR) from 27 countries in that year. Among these 32 PWRs belong to six Central European Countries. The analysis of the exposure of workers based on radiation protection performance indicators (collective dose, average dose etc.) in these PWRs could be related to some nuclear safety performance indicators for recent years using ISOE database. The comparison is made to ISOE world - wide data. In the six Central European Countries altogether 32 PWR operated in the year 2001.The international databases of performance indicators related to radiation protection as for example the ISOE or the UNSCEAR database can be use as an efficient tool in the management of radiation protection of workers in a nuclear facilities and regulatory bodies. The databases enable the study of performance trends and the improvement of radiation protection. (authors)

  13. Secondary seal effects in hydrostatic non-contact seals for reactor coolant pump shaft

    International Nuclear Information System (INIS)

    Fujita, T.; Koga, T.; Tanoue, H.; Hirabayashi, H.

    1987-01-01

    The paper presents a seal flow analysis in a hydrostatic non-contact seal for a PWR coolant pump shaft. A description is given of the non-contact seal for the reactor coolant pump. Results are presented for a distortion analysis of the seal ring, along with the seal flow characteristics and the contact pressure profiles of the secondary seals. The results of the work confirm previously reported findings that the seal ring distortion is sensitive to the o-ring location (which was placed between the ceramic seal face and the seal ring retainer). The paper concludes that the seal flow characteristics and the tracking performance depend upon the dynamic properties of the secondary seal. (U.K.)

  14. Behavior of sulfur species in steam generator conditions of PWRs - towards an update of the secondary side corrosion cracking model based on laboratory tests in sulfate environments

    International Nuclear Information System (INIS)

    Mansour, C.; Legras, L.; Catalette, H.; Lefevre, G.; Fedoroff, M.; Pavageau, E.-M.

    2007-01-01

    Secondary side corrosion cracking affects Mill Annealed Alloy 600 steam generator (SG) tubes of PWRs in flow restricted areas where pollutants, such as sulfate, can concentrate and form various aggressive local environments. The 'sulfate model', based on laboratory tests in sulfate environments, was developed to predict the degradation of SG tubes. Such prediction is aimed to be done after having evaluated the chemistry in the flow restricted areas where the degradation occurs. For such purpose, a better knowledge of the behavior of sulfur species in SG conditions is needed. After a brief description of the sulfate model, this paper focuses on the latest experimental results that have been obtained : sorption of sulfur species over magnetite in SG temperature conditions, thermodynamical calculations as well as transmission electron microscopy and X-ray photoelectron spectroscopy observations of magnetite after sorption and C-Ring specimens tested in sulfate environments. Then, all these results are discussed in order to contribute to a better understanding of the secondary side corrosion cracking of SG tubes. (author)

  15. Assessment of options for the treatment of Sizewell PWR liquid effluent

    International Nuclear Information System (INIS)

    Hornby, J.; Allam, J.; Knibbs, R.H.

    1992-01-01

    This report describes the origins of PWR liquid waste streams, their composition and rates of arising. Data has been collected from operational PWRs and estimates obtained for Sizewell B PWR liquid waste streams. Current liquid waste treatment practices are reviewed and assessments made of established and novel treatment techniques which could be applicable to Sizewell B. A short list of treatment options is given and recommendations are made relating to established treatment technologies suitable for Sizewell B and also to development work on more novel treatments which could lead to a reduction in waste disposal volumes. (author)

  16. Experiments on natural circulation during PWR severe accidents and their analysis

    International Nuclear Information System (INIS)

    Sehgal, B.R.; Stewart, W.A.; Sha, W.T.

    1988-01-01

    Buoyancy-induced natural circulation flows will occur during the early-part of PWR high pressure accident scenarios. These flows affect several key parameters; in particular, the course of such accidents will most probably change due to local failures occurring in the primary coolant system (CS) before substantial core degradation. Natural circulation flow patterns were measured in a one-seventh scale PWR PCS facility at Westinghouse RandD laboratories. The measured flow and temperature distributions are report in this paper. The experiments were analyzed with the COMMIX code and good agreement was obtained between data and calculations. 10 refs., 8 figs., 2 tabs

  17. Industrial assessment of nonbackfittable PWR design modifications. Final report

    International Nuclear Information System (INIS)

    Matzie, R.A.; Daleas, R.S.; Miller, D.D.

    1980-11-01

    As part of the US Department of Energy's Advanced Reactor Design Study, various nonbackfittable PWR design modifications were evaluated to determine their potential for improved uranium utilization and commercial viability. Combustion Engineering, Inc. contributed to this effort through participation in the Battelle Pacific Northwest Laboratory industrial assessment of such design modifications. Seven modifications, including the use of higher primary system temperatures and pressures, rapid-frequent refueling, end-of-cycle stretchout, core periphery modifications, radial blankets, low power density cores, and small PWR assemblies, were evaluated with respect to uranium utilization, economics, technical and operational complexity, and several other subjective considerations. Rapid-frequent refueling was judged to have the highest potential although it would probably not be economical for the majority of reactors with the design assumptions used in this assessment

  18. Shielding design for PWR in France

    International Nuclear Information System (INIS)

    Champion, G.; Charransol; Le Dieu de Ville, A.; Nimal, J.C.; Vergnaud, T.

    1983-05-01

    Shielding calculation scheme used in France for PWR is presented here for 900 MWe and 1300 MWe plants built by EDF the French utility giving electricity. Neutron dose rate at areas accessible by personnel during the reactor operation is calculated and compared with the measurements which were carried out in 900 MWe units up to now. Measurements on the first French 1300 MWe reactor are foreseen at the end of 1983

  19. Dissolution process for advanced-PWR-type fuels

    International Nuclear Information System (INIS)

    Black, D.E.; Decker, L.A.; Pearson, L.G.

    1979-01-01

    The new Fluorinel Dissolution Process and Fuel Storage (FAST) Facility at ICPP will provide underwater storage of spent PWR fuel and a new head-end process for fuel dissolution. The dissolution will be two-stage, using HF and HNO 3 , with an intermittent H 2 SO 4 dissolution for removing stainless steel components. Equipment operation is described

  20. A Non-Linear Digital Computer Model Requiring Short Computation Time for Studies Concerning the Hydrodynamics of the BWR

    Energy Technology Data Exchange (ETDEWEB)

    Reisch, F; Vayssier, G

    1969-05-15

    This non-linear model serves as one of the blocks in a series of codes to study the transient behaviour of BWR or PWR type reactors. This program is intended to be the hydrodynamic part of the BWR core representation or the hydrodynamic part of the PWR heat exchanger secondary side representation. The equations have been prepared for the CSMP digital simulation language. By using the most suitable integration routine available, the ratio of simulation time to real time is about one on an IBM 360/75 digital computer. Use of the slightly different language DSL/40 on an IBM 7044 computer takes about four times longer. The code has been tested against the Eindhoven loop with satisfactory agreement.

  1. ROX PWR

    Energy Technology Data Exchange (ETDEWEB)

    Akie, H.; Yamashita, T.; Shirasu, N.; Takano, H.; Anoda, Y.; Kimura, H. [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1999-12-01

    For an efficient burnup of excess plutonium from nuclear reactors spent fuels and dismantled warheads, plutonium rock-like oxide(ROX) fuel has been investigated. The ROX fuel is expected to provide high Pu transmutation capability, irradiation stability and chemical and geological stability. While, a zirconia-based ROX(Zr-ROX)-fueled PWR core has some problems of Doppler reactivity coefficient and power peaking factor. For the improvement of these characteristics, two approaches were considered: the additives such as UO{sub 2}, ThO{sub 2} and Er{sub 2}O{sub 3}, and a heterogeneous core with Zr-ROX and UO{sub 2} assemblies. As a result, the additives UO{sub 2}+ Er{sub 2}O{sub 3} are found to sufficiently improve the reactivity coefficients and accident behavior, and to flatten power distribution. On the other hand, in the 1/3Zr-ROX + 2/3UO{sub 2} heterogeneous core, further reduction of power peaking seems necessary. (author)

  2. Development of a coupling code for PWR reactor cavity radiation streaming calculation

    International Nuclear Information System (INIS)

    Zheng, Z.; Wu, H.; Cao, L.; Zheng, Y.; Zhang, H.; Wang, M.

    2012-01-01

    PWR reactor cavity radiation streaming is important for the safe of the personnel and equipment, thus calculation has to be performed to evaluate the neutron flux distribution around the reactor. For this calculation, the deterministic codes have difficulties in fine geometrical modeling and need huge computer resource; and the Monte Carlo codes require very long sampling time to obtain results with acceptable precision. Therefore, a coupling method has been developed to eliminate the two problems mentioned above in each code. In this study, we develop a coupling code named DORT2MCNP to link the Sn code DORT and Monte Carlo code MCNP. DORT2MCNP is used to produce a combined surface source containing top, bottom and side surface simultaneously. Because SDEF card is unsuitable for the combined surface source, we modify the SOURCE subroutine of MCNP and compile MCNP for this application. Numerical results demonstrate the correctness of the coupling code DORT2MCNP and show reasonable agreement between the coupling method and the other two codes (DORT and MCNP). (authors)

  3. Secondary Channel Bifurcation Geometry: A Multi-dimensional Problem

    Science.gov (United States)

    Gaeuman, D.; Stewart, R. L.

    2017-12-01

    The construction of secondary channels (or side channels) is a popular strategy for increasing aquatic habitat complexity in managed rivers. Such channels, however, frequently experience aggradation that prevents surface water from entering the side channels near their bifurcation points during periods of relatively low discharge. This failure to maintain an uninterrupted surface water connection with the main channel can reduce the habitat value of side channels for fish species that prefer lotic conditions. Various factors have been proposed as potential controls on the fate of side channels, including water surface slope differences between the main and secondary channels, the presence of main channel secondary circulation, transverse bed slopes, and bifurcation angle. A quantitative assessment of more than 50 natural and constructed secondary channels in the Trinity River of northern California indicates that bifurcations can assume a variety of configurations that are formed by different processes and whose longevity is governed by different sets of factors. Moreover, factors such as bifurcation angle and water surface slope vary with discharge level and are continuously distributed in space, such that they must be viewed as a multi-dimensional field rather than a single-valued attribute that can be assigned to a particular bifurcation.

  4. Development and application of integrated digital I and C system in Japanese PWR plants

    International Nuclear Information System (INIS)

    Tominaga, M.

    1995-01-01

    The Integrated Digital Instrumentation and Control (I and C) System has been developed and applied to non-safety grade I and C systems in the latest 5 Japanese PWR plants in 1990's. Based on the experience in these plants, the Integrated Digital I and C System will be planned to apply also to safety grade I and C systems in Advanced PWR (APWR) as the overall application of digital technology. The basic design task has been just started for APWR which is to be in commercial operation in early 2000's and under the development about various issues of safety grade digital I and C systems. On the other hand, in conventional Japanese PWR plants, digital I and C systems have been applied step by step since 1980's. For example, digital I and C systems for radio-active waste processing system have been adopted to 13 units, and dedicated digital I and C systems for Local loop control system to 8 units. The trend and status of development and application of the digital I and C systems, especially the Integrated Digital I and C System in Japanese PWR plants are presented. (5 refs., 4 figs.)

  5. French PWR safety philosophy

    International Nuclear Information System (INIS)

    Conte, M.

    1986-05-01

    Increasing knowledge and lessons learned from starting and operating experience of French nuclear power plants, completed by the experience learned from the operation of foreign reactors, has contributed to the improvement of French PWR design and safety philosophy. Based on a deterministic approach, the French safety analysis was progressively completed by a probabilistic approach, each of them having possibilities and limits. As a consequence of the global risk objective set in 1977 for nuclear reactors, safety analysis was extended to the evaluation of events more complex than the conventional ones, and later to the evaluation of the feasibility of the offsite emergency plans in case of severe accidents

  6. An analysis of transients in the PWR downcomer

    International Nuclear Information System (INIS)

    Jovanovic, A.

    1981-01-01

    The paper deals with the problem of determining non-stationary temperature field in the downcomer of a PWR type reactor. For this purpose, an analytical model has been developed. The model covers five components of (PWR - Krsko) downcomer: the core-barrel, floor between the core-barrel and the thermal shield, the thermal shield, flow between the thermal shield and the reactor vessel wall, the reactor vessel wall. The model includes internal heat generation in metal structures. The governing equations of the model have been written in the finite difference explicit form. The system of resulting algebraic equations was solved bu Gauss-Seidel method, using a modular computer code. Several characteristic transients were examined (step and continuous change of fluid temperature at the inlet nozzle). Also, an analysis of main parameters (heat transfer coefficient and flow rate) has been performed. The model is intended to be used as basics for further development of a more realistic model that could be used for practical safety analysis. (author)

  7. Simplified analysis of passive residual heat removal systems for small size PWR's

    International Nuclear Information System (INIS)

    Botelho, D.A.

    1992-02-01

    The function and general objectives of a passive residual heat removal system for small size PWR's are defined. The characteristic configuration, the components and the operation modes of this system are concisely described. A preliminary conceptual specification of this system, for a small size PWR of 400 MW thermal, is made analogous to the decay heat removal system of the AP-600 reactor. It is shown by analytic models that such passive systems can dissipate 2% of nominal power within the thermal limits allowed to the reactor fuel elements. (author)

  8. The Effects of Hot Bending on the Low Cycle Fatigue Behaviors of 347 SS in PWR Primary Environment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Ho-Sub; Hong, Jong-Dae; Lee, Junho; Jang, Changheui [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2014-10-15

    Fatigue damage could be significant for some locations, especially the welds and bends where stress concentration is typically high. As a possible solution, a large radius hot-bending method has been suggested to eliminate some weld joints and all tight bends. However, for the hot-bending process which involves a high temperature thermal cycle, there is a concern about changes in mechanical properties including low cycle fatigue behaviors. In APR1400, Type 347 SS have been used as surge line pipes. Therefore, to verify the applicability of hot-bending on 347 SS surge line pipes, an environmental fatigue test program was initiated. In this paper, the preliminary results of the on-going test program are introduced. Also, the low cycle fatigue behaviors of 347 SS are compared with those of other grade of stainless steels. The effects of hot bending on the low cycle fatigue behavior of 347 SS were quantitatively evaluated. The fatigue life was compared with the estimated values per NUREG 6909 rev. 1. There are no distinct differences between NUREG 6909 and LCF tests. According to fractography and cross section analysis in progress, basically, the reduction of LCF life of 347 SS in PWR water was caused by operation of HIC mechanism. The cyclic stress responses shows that there is no secondary hardening in 330 .deg.C air and PWR water.

  9. Measurement of the residual stresses in a PWR Control Rod Drive Mechanism nozzle

    OpenAIRE

    Coules, Harry; Smith, David

    2018-01-01

    Residual stress in the welds that attach Control Rod Drive Mechanism nozzles into the upper head of a PWR reactor vessel can influence the vessel's structural integrity and initiate Primary Water Stress Corrosion Cracking. PWSCC at Alloy 600 CRDM nozzles has caused primary coolant leakage in operating PWRs. We have used Deep Hole Drilling to characterise residual stresses in a PWR vessel head. Measurements of the internal cladding and nozzle attachment weld showed that although modest tensile...

  10. The effect of the PWR secondary circuit water chemistry on erosion corrosion

    International Nuclear Information System (INIS)

    Kaplan, J.

    1993-07-01

    The secondary circuit of WWER-440 and WWER-1000 reactors is described. The causes of erosion corrosion are outlined, and the effects of the physical properties and chemical composition of water are discussed with emphasis on specific conductivity and concentrations of oxygen, ammonia, iron, sodium, silicon and organics. Described are corrective actions to eliminate the deviations from the normal state during reactor power reduction or reactor shutdown. (J.B.)

  11. FLUOLE-2: An Experiment for PWR Pressure Vessel Surveillance

    Directory of Open Access Journals (Sweden)

    Thiollay Nicolas

    2016-01-01

    Full Text Available FLUOLE-2 is a benchmark-type experiment dedicated to 900 and 1450 MWe PWR vessels surveillance dosimetry. This two-year program started in 2014 and will end in 2015. It will provide precise experimental data for the validation of the neutron spectrum propagation calculation from core to vessel. It is composed of a square core surrounded by a stainless steel baffe and internals: PWR barrel is simulated by steel structures leading to different steel-water slides; two steel components stand for a surveillance capsule holder and for a part of the pressure vessel. Measurement locations are available on the whole experimental structure. The experimental knowledge of core sources will be obtained by integral gamma scanning measurements directly on fuel pins. Reaction rates measured by calibrated fission chambers and a large set of dosimeters will give information on the neutron energy and spatial distributions. Due to the low level neutron flux of EOLE ZPR a special, high efficiency, calibrated gamma spectrometry device will be used for some dosimeters, allowing to measure an activity as low as 7. 10−2 Bq per sample. 103mRh activities will be measured on an absolute calibrated X spectrometry device. FLUOLE-2 experiment goal is to usefully complete the current experimental benchmarks database used for the validation of neutron calculation codes. This two-year program completes the initial FLUOLE program held in 2006–2007 in a geometry representative of 1300 MWe PWR.

  12. Liquid radioactive waste processing improvement of PWR nuclear power plants; Melhorias no processamento de rejeitos liquidos radioativos de usinas nucleares PWR

    Energy Technology Data Exchange (ETDEWEB)

    Nery, Renata Wolter dos Reis; Martinez, Aquilino Senra; Monteiro, Jose Luiz Fontes [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Programa de Engenharia Nuclear]. E-mail: wolter@eletronuclear.gov.br; monteiro@peq.coppe.ufrj.br; aquilinosenra@lmp.ufrj.br

    2005-07-01

    The study evaluate an inorganic ion exchange to process the low level liquid radwaste of PWR nuclear plants, so that the level of the radioactivity in the effluents and the solid waste produced during the treatment of these liquid radwaste can be reduced. The work compares two types of ion exchange materials, a strong acid cation exchange resin, that is the material typically used to remove radionuclides from PWR nuclear plants wastes, and a mordenite zeolite. These exchange material were used to remove cesium from a synthetic effluent containing only this ion and another effluent containing cesium and cobalt. The breakthrough curves of the zeolite and resin using a fix bed reactor were compared. The results demonstrated that the zeolite is more efficient than the resin in removing cesium from a solution containing cesium and cobalt. The results also showed that a bed combining zeolite and resin can process more volume of an effluent containing cesium and cobalt than a bed resin alone. (author)

  13. Corrosion potential monitoring in nuclear power environments

    International Nuclear Information System (INIS)

    Molander, A.

    2004-01-01

    Full text of publication follows: corrosion monitoring. The corrosion potential is usually an important parameter or even the prime parameter for many types of corrosion processes. One typical example of the strong influence of the corrosion potential on corrosion performance is stress corrosion of sensitized stainless steel in pure high temperature water corresponding to boiling water conditions. The use of in-plant monitoring to follow the effect of hydrogen addition to mitigate stress corrosion in boiling water reactors is now a well-established technique. However, different relations between the corrosion potential of stainless steel and the oxidant concentration have been published and only recently an improved understanding of the electrochemical reactions and other conditions that determine the corrosion potential in BWR systems have been reached. This improved knowledge will be reviewed in this paper. Electrochemical measurements has also been performed in PWR systems and mainly the feedwater system on the secondary side of PWRs. The measurements performed so far have shown that electrochemical measurements are a very sensitive tool to detect and follow oxygen transients in the feedwater system. Also determinations of the minimum hydrazine dosage to the feedwater have been performed. However, PWR secondary side monitoring has not yet been utilized to the same level as BWR hydrogen water chemistry surveillance. The future potential of corrosion potential monitoring will be discussed. Electrochemical measurements are also performed in other reactor systems and in other types of reactors. Experiences will be briefly reviewed. In a BWR on hydrogen water chemistry and in the PWR secondary system the corrosion potentials show a large variation between different system parts. To postulate the material behavior at different locations the local chemical and electrochemical conditions must be known. Thus, modeling of chemical and electrochemical conditions along

  14. Analysis of reactivity worths of highly-burnt PWR fuel samples measured in LWR-PROTEUS Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Grimm, Peter; Murphy, Michael F.; Jatuff, Fabian; Seiler, Rudolf [Paul Scherrer Institute, CH-5232 Villigen PSI (Switzerland)

    2008-07-01

    The reactivity loss of PWR fuel with burnup has been determined experimentally by inserting fresh and highly-burnt fuel samples in a PWR test lattice in the framework of the LWR-PROTEUS Phase II programme. Seven UO{sub 2} samples irradiated in a Swiss PWR plant with burnups ranging from approx40 to approx120 MWd/kg and four MOX samples with burnups up to approx70 MWd/kg were oscillated in a test region constituted of actual PWR UO{sub 2} fuel rods in the centre of the PROTEUS zero-power experimental facility. The measurements were analyzed using the CASMO-4E fuel assembly code and a cross section library based on the ENDF/B-VI evaluation. The results show close proximity between calculated and measured reactivity effects and no trend for a deterioration of the quality of the prediction at high burnup. The analysis thus demonstrates the high accuracy of the calculation of the reactivity of highly-burnt fuel. (authors)

  15. Experimental research progress on passive safety systems of Chinese advanced PWR

    International Nuclear Information System (INIS)

    Xiao Zejun; Zhuo Wenbin; Zheng Hua; Chen Bingde; Zong Guifang; Jia Dounan

    2003-01-01

    TMI and Chernobyl accidents, having pronounced impact on nuclear industries, triggered the governments as well as interested institutions to devote much attention to the safety of nuclear power plant and public's requirements on nuclear power plant safety were also going to be stricter and stricter. It is obvious that safety level of an ordinary light water reactor is no longer satisfactory to these requirements. Recently, the safety authorities have recommended the implementation of passive system to improve the safety of nuclear reactors. Passive safety system is one of the main differences between Chinese advanced PWR and other conventional PWR. The working principle of passive safety system is to utilize the gravity, natural convection (natural circulation) and stored energy to implement the system's safety function. Reactors with passive safety systems are not only safer, but also more economical. The passive safety system of Chinese advanced PWR is composed of three independent systems, i.e. passive containment cooling system, passive residual heat removal system and passive core makeup tank injection system. This paper is a summary of experimental research progress on passive containment cooling system, passive residual heat removal system and passive core makeup tank injection system

  16. Simulation model of a PWR power plant

    International Nuclear Information System (INIS)

    Larsen, N.

    1987-03-01

    A simulation model of a hypothetical PWR power plant is described. A large number of disturbances and failures in plant function can be simulated. The model is written as seven modules to the modular simulation system for continuous processes DYSIM and serves also as a user example of this system. The model runs in Fortran 77 on the IBM-PC-AT. (author)

  17. Mathematical modelling of plant transients in the PWR for simulator purposes

    International Nuclear Information System (INIS)

    Hartel, K.

    1984-01-01

    This chapter presents the results of the testing of anticipated and abnormal plant transients in pressurized water reactors (PWRs) of the type WWER 440 by means of the numerical simulation of 32 different, stationary and nonstationary, operational regimes. Topics considered include the formation of the PWR mathematical model, the physical approximation of the reactor core, the structure of the reactor core model, a mathematical approximation of the reactor model, the selection of numerical methods, and a computerized simulation system. The necessity of a PWR simulator in Czechoslovakia is justified by the present status and the outlook for the further development of the Czechoslovak nuclear power complex

  18. Nonlinear Fuzzy Model Predictive Control for a PWR Nuclear Power Plant

    Directory of Open Access Journals (Sweden)

    Xiangjie Liu

    2014-01-01

    Full Text Available Reliable power and temperature control in pressurized water reactor (PWR nuclear power plant is necessary to guarantee high efficiency and plant safety. Since the nuclear plants are quite nonlinear, the paper presents nonlinear fuzzy model predictive control (MPC, by incorporating the realistic constraints, to realize the plant optimization. T-S fuzzy modeling on nuclear power plant is utilized to approximate the nonlinear plant, based on which the nonlinear MPC controller is devised via parallel distributed compensation (PDC scheme in order to solve the nonlinear constraint optimization problem. Improved performance compared to the traditional PID controller for a TMI-type PWR is obtained in the simulation.

  19. The optimum fuel and power distribution for a PWR burnup cycle

    International Nuclear Information System (INIS)

    Stillman, J.A.

    1989-01-01

    A method was developed to determine the optimum fuel and power distributions for a PWR burnup cycle. The backward diffusion calculation [1] and the Core-wise Green's Function [2] method were used for the core model which provided analytic derivatives for solving the nonlinear optimization problem using successive linear programming [3] methods. The solution algorithm consisted of a reverse depletion strategy which begins at the end of cycle and solves simultaneously for the optimal fuel and burnable absorber distributions while the core is depleted to the beginning of cycle. The resulting optimal solutions minimize the required fissile fuel inventory and burnable absorber loading for a PWR

  20. Advanced evaluation method of SG TSP BEC hole blockage rate

    International Nuclear Information System (INIS)

    Izumida, Hiroyuki; Nagata, Yasuyuki; Harada, Yutaka; Murakami, Ryuji

    2003-01-01

    In spite of the control of the water chemistry of SG secondary feed-water in PWR-SG, SG TSP BEC holes, which are the flow path of secondary water, are often clogged. In the past, the trending of BEC hole blockage rate has conducted by evaluating ECT original signals and visual inspections. However, the ECT original signals of deposits are diversified, it becomes difficult to analyze them with the existing evaluation method using the ECT original signals. In this regard, we have developed the secondary side visual inspection system, which enables the high-accuracy evaluation of BEC hole blockage rate, and new ECT signal evaluation method. (author)

  1. Resfria - a computational routine for thermal-hydraulic analysis of a cooldown in the PWR

    International Nuclear Information System (INIS)

    Silva Neto, A.J. da; Maciel Filho, L.A.

    1989-01-01

    This paper presents the computer code RESFRIA, designed to calculate the process parameters in a PWR nuclear power plant during a cooldown normal procedure. The procedure is described and some of the models developed to the simulation of systems and equipments are presented. A simplified flowchart of the computational routine and the results in the form of a diagram, for a typical PWR nuclear power plant, are also presented. (author)

  2. Performance of core exit thermocouple for PWR accident management action in vessel top break LOCA simulation experiment at OECD/NEA ROSA project

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Takeda, Takeshi; Nakamura, Hideo

    2009-01-01

    Presented are experiment results of the Large Scale Test Facility (LSTF) conducted at the Japan Atomic Energy Agency (JAEA) with a focus on core exit thermocouple (CET) performance to detect core overheat during a vessel top break loss-of-coolant accident (LOCA) simulation experiment. The CET temperatures are used to start accident management (AM) action to quickly depressurize steam generator (SG) secondary side in case of core temperature excursion. Test 6-1 is first test of the OECD/NEA ROSA Project started in 2005, simulating withdraw of a control rod drive mechanism penetration nozzle at the vessel top head. The break size is equivalent to 1.9% cold leg break. The AM action was initiated when CET temperature rose up to 623K. There was no reflux water fallback onto the CETs during the core heat-up period. The core overheat, however, was detected with a time delay of about 230s. In addition, a large temperature discrepancy was observed between the CETs and the hottest core region. This paper clarifies the reason of time delay and temperature discrepancy between the CETs and heated core during boil-off including three-dimensional steam flows in the core and core exit. The paper discusses applicability of the LSTF CET performance to pressurized water reactor (PWR) conditions and a possibility of alternative indicators for earlier AM action than in Test 6-1 is studied by using symptom-based plant parameters such as a reactor vessel water level detection. (author)

  3. Product Evaluation Task Force Phase Two report for BWR/PWR dissolver wastes

    International Nuclear Information System (INIS)

    Francis, A.J.

    1990-01-01

    It has been proposed that all Intermediate Level Wastes arising at Sellafield should be encapsulated prior to ultimate disposal. The Product Evaluation Task Force (PETF) was set up to investigate possible encapsulants and to produce an adequate data base to justify the preferred matrices. This report details the work carried out, under Phase 2 of the Product Evaluation Task Force programme, on BWR/PWR Dissolver Wastes. Three possible types of encapsulants for BWR/PWR Dissolver Wastes:- Inorganic cements, Polymer cements and Polymers are evaluated using the Kepner Tregoe decision analysis technique. This technique provides a methodology for scoring and ranking alternative options and evaluating any risks associated with an option. The analysis shows that for all four stages of waste management operations ie Storage, Transport, handling and emplacement, Disposal and Process, cement matrices are considerably superior to other potential matrices. A matrix, consisting of three parts Blast Furnace Slag (BFS) to one part Ordinary Portland Cement (OPC), is recommended for Phase 3 studies on BWR/PWR Dissolver Wastes. (author)

  4. A study on secondary images in panoramic radiograph

    International Nuclear Information System (INIS)

    Cho, Dai Hee; Kim, Han Pyong

    1984-01-01

    This study was performed to observe the secondary images and to analyse the relationships between the primary and secondary images in panoramic radiograph. Using the Morita's Panex-EC panoramic x-ray machine and the human dry skull, the author analysed 17 radiographs which were selected from 65 radiographs of the dry skull that attached the radiopaque materials, and the attached regions of the radiopaque materials were the normal anatomical structures which were important and selected as a region for the evaluation of the secondary images effectively. The results were as follows; 1. The cervical vertebrae showed three images. The midline image was the most distorted and less clear, and bilateral images were slightly superimposed over the posterior border of the mandibular ramus. 2. In mandible, the secondary image of the posterior border of the ramus was superimposed on the opposite ramus region, and this image was elongated from the anterior border of the ramus to the lateral side of the posterior border of the ramus. The secondary image of the condyle was observed on the upper area of the coronoid process, the sigmoid notch and the condyle in opposite side. 3. In maxilla, the posterior region of the hard palate showed the secondary image on the lower part of the nasal cavity and the medial wall of the maxillary sinus. 4. The primary images of the occipital condyle and the mastoid process appeared on the same region, and only the secondary image of the occipital condyle was observed symmetrically on the opposite side with similar shape to the primary one. 5. In the cranial base, the anatomical structures of the midsagittal portions like a inferior border of the frontal sinus, sella turcica, inferior border of the sphenoid sinus and inferior border of the posterior part of the occipital bone showed the similar shape between the primary and secondary images symmetrically. 6. The petrous portion of the temporal bone showed the secondary image of the lateral side of

  5. Modeling of PWR fuel at extended burnup

    International Nuclear Information System (INIS)

    Dias, Raphael Mejias

    2016-01-01

    This work studies the modifications implemented over successive versions in the empirical models of the computer program FRAPCON used to simulate the steady state irradiation performance of Pressurized Water Reactor (PWR) fuel rods under high burnup condition. In the study, the empirical models present in FRAPCON official documentation were analyzed. A literature study was conducted on the effects of high burnup in nuclear fuels and to improve the understanding of the models used by FRAPCON program in these conditions. A steady state fuel performance analysis was conducted for a typical PWR fuel rod using FRAPCON program versions 3.3, 3.4, and 3.5. The results presented by the different versions of the program were compared in order to verify the impact of model changes in the output parameters of the program. It was observed that the changes brought significant differences in the results of the fuel rod thermal and mechanical parameters, especially when they evolved from FRAPCON-3.3 version to FRAPCON-3.5 version. Lower temperatures, lower cladding stress and strain, lower cladding oxide layer thickness were obtained in the fuel rod analyzed with the FRAPCON-3.5 version. (author)

  6. Cause analysis for elbow thinning of the secondary loop feedwater system in PWR NPP

    International Nuclear Information System (INIS)

    Yu Tao; Bian Chunhua; Zhang Wei; Luo Kunjie; Wang Li; Li Yan

    2013-01-01

    Wall thickness of some secondary system pipelines were measured on site during the refueling outages in March 2012. Wall thinning happened in some components of APA system. This paper focused on the cause analysis of an elbow with that phenomenon. Wall thickness was carefully measured in laboratory using ultrasonic thickness meter and found that wall thinning happened nearly all elbows including two abnormal thinning regions. Analytical research was conducted using ICP, stereo microscope, SEM, XRD, ANSYS. The result shows that the cause of wall thinning is flow accelerated corrosion. Based on the analysis result and international research progress, this paper makes some suggestions to avoid and alleviate FAC in the secondary system. (authors)

  7. Sensitivity analysis of a PWR pressurizer

    International Nuclear Information System (INIS)

    Bruel, Renata Nunes

    1997-01-01

    A sensitivity analysis relative to the parameters and modelling of the physical process in a PWR pressurizer has been performed. The sensitivity analysis was developed by implementing the key parameters and theoretical model lings which generated a comprehensive matrix of influences of each changes analysed. The major influences that have been observed were the flashing phenomenon and the steam condensation on the spray drops. The present analysis is also applicable to the several theoretical and experimental areas. (author)

  8. Organization patterns of PWR power plants

    International Nuclear Information System (INIS)

    Leicman, J.

    1980-01-01

    Organization patterns are shown for the St. Lucia 1, North Anna, Sequoyah, and Beaver Valley nuclear power plants, for a typical PWR power plant in the USA, for the Biblis/RWE-KWU nuclear power plants and for a four-unit nuclear power plant operated by Electricite de France as well as for the Loviisa power plant. Organization patterns are also shown for relatively independent and non-independent nuclear power plants according to IAEA recommendations. (J.P.)

  9. Optimum fuel use in PWR reactors

    International Nuclear Information System (INIS)

    Neubauer, W.

    1979-07-01

    An optimization program was developed to calculate minimum-cost refuelling schedules for PWR reactors. Optimization was made over several cycles, without any constraints (equilibrium cycle). In developing the optimization program, special consideration was given to an individual treatment of every fuel element and to a sufficiently accurate calculation of all the data required for safe reactor operation. The results of the optimization program were compared with experimental values obtained at Obrigheim nuclear power plant. (orig.) [de

  10. Chemistry Optimitation of a PWR nuclear power plant

    International Nuclear Information System (INIS)

    Frandrich, J.; Ramminger, U.

    2015-01-01

    One of the main objectives for the plant operator of a Nuclear Power Plant is to protect the Steam Generators (SG) during the lifetime of the plant by ensuring a safe and reliable operation. The SGs serve as an important barrier to prevent the spread of contamination out of the primary circuit. One the other hand impurities are accumulated within the SGs leading to extreme chemical and physical conditions. The application of an optimized water chemistry treatment of the secondary side is essential to ensure a good performance of the steam generators. (Author)

  11. Alloy 690 in PWR type reactors; Aleaciones base niquel en condiciones de primario de los reactores tipo PWR

    Energy Technology Data Exchange (ETDEWEB)

    Gomez Briceno, D.; Serrano, M.

    2005-07-01

    Alloy 690, used as replacement of Alloy 600 for vessel head penetration (VHP) nozzles in PWR, coexists in the primary loop with other components of Alloy 600. Alloy 690 shows an excellent resistance to primary water stress corrosion cracking, while Alloy 600 is very susceptible to this degradation mechanisms. This article analyse comparatively the PWSCC behaviour of both Ni-based alloys and associated weld metals 52/152 and 82/182. (Author)

  12. PWR burnable absorber evaluation

    International Nuclear Information System (INIS)

    Cacciapouti, R.J.; Weader, R.J.; Malone, J.P.

    1995-01-01

    The purpose of the study was to evaluate the relative neurotic efficiency and fuel cycle cost benefits of PWR burnable absorbers. Establishment of reference low-leakage equilibrium in-core fuel management plans for 12-, 18- and 24-month cycles. Review of the fuel management impact of the integral fuel burnable absorber (IFBA), erbium and gadolinium. Calculation of the U 3 O 8 , UF 6 , SWU, fuel fabrication, and burnable absorber requirements for the defined fuel management plans. Estimation of fuel cycle costs of each fuel management plan at spot market and long-term market fuel prices. Estimation of the comparative savings of the different burnable absorbers in dollar equivalent per kgU of fabricated fuel. (author)

  13. PWR degraded core analysis

    International Nuclear Information System (INIS)

    Gittus, J.H.

    1982-04-01

    A review is presented of the various phenomena involved in degraded core accidents and the ensuing transport of fission products from the fuel to the primary circuit and the containment. The dominant accident sequences found in the PWR risk studies published to date are briefly described. Then chapters deal with the following topics: the condition and behaviour of water reactor fuel during normal operation and at the commencement of degraded core accidents; the generation of hydrogen from the Zircaloy-steam and the steel-steam reactions; the way in which the core deforms and finally melts following loss of coolant; debris relocation analysis; containment integrity; fission product behaviour during a degraded core accident. (U.K.)

  14. Comparison of the long-time corrosion behavior of certain Zr alloys in PWR, BWR, and laboratory tests

    International Nuclear Information System (INIS)

    Garzarolli, F.; Broy, Y.; Busch, R.A.

    1996-01-01

    Laboratory corrosion tests have always been an important tool for Zr alloy development and optimization. However, it must be known whether a test is representative for the application in-reactor. To shed more light on this question, coupons of several Zr alloys were exposed under isothermal conditions in BWR and PWR type environments. For evaluation of the in-PWR tests and for comparison of out-of-pile and in-pile tests, the different temperatures and times were normalized to a temperature-independent normalized time by assuming an activation temperature (Q/R) of 14,200 K. Comparison of in-PWR and out-of-pile corrosion behavior of Zircaloy shows that corrosion deviates to higher values in PWR if a weight gain of about 50 mg/dm 2 is exceeded. In the case of the Zr2.5Nb alloy, a slight deviation of corrosion as compared to laboratory results starts in PWR only above a weight gain of 100 mg/dm 2 . In BWR, corrosion of Zircaloy is enhanced early in time if compared with out-of-pile. Zr2.5Nb exhibits higher corrosion results in BWR than Zircaloy-4. Alloying chemistry and material condition affect corrosion of Zr alloys. However, several of the material parameters have shown a different ranking in the different environments. Nevertheless, several material parameters influencing in-reactor corrosion like the second phase particle (SPP) size of in-PWR behavior as the Sn and Fe content can be optimized by out-of-pile corrosion tests

  15. Categorization of PWR accident sequences and guidelines for fault trees: seismic initiators

    International Nuclear Information System (INIS)

    Kimura, C.Y.

    1984-09-01

    This study developed a set of dominant accident sequences that could be applied generically to domestic commercial PWRs as a standardized basis for a probabilistic seismic risk assessment. This was accomplished by ranking the Zion 1 accident sequences. The pertinent PWR safety systems were compared on a plant-by-plant basis to determine the applicability of the dominant accident sequences of Zion 1 to other PWR plants. The functional event trees were developed to describe the system functions that must work or not work in order for a certain accident sequence to happen, one for pipe breaks and one for transients

  16. Design of a PWR for long cycle and direct recycling of spent fuel

    Energy Technology Data Exchange (ETDEWEB)

    Mohamed, Nader M.A., E-mail: mnader73@yahoo.com

    2015-12-15

    Highlights: • Single-batch loading PWR with a new fuel assembly for 36 calendar months cycle was designed. • The new fuel assembly is constructed from a number of CANDU fuel bundles. • This design enables to recycle the spent fuel directly in CANDU reactors for high burnup. • Around 56 MWd/kgU burnup is achieved from fuel that has average enrichment of 4.8 w/o U-235 using this strategy. • Safety parameters such as the power distribution and CANDU coolant void reactivity were considered. - Abstract: In a previous work, a new design was proposed for the Pressurized Water Reactor (PWR) fuel assembly for direct use of the PWR spent fuel without processing. The proposed assembly has four zircaloy-4 tubes contains a number of 61-element CANDU fuel bundles (8 bundles per tube) stacked end to end. The space between the tubes contains 44 lower enriched UO{sub 2} fuel rods and 12 guide tubes. In this paper, this assembly is used to build a single batch loading 36-month PWR and the spent CANDU bundles are recycled in the on power refueling CANDU reactors. The Advanced PWR (APWR) is considered as a reference design. The average enrichment in the core is 4.76%w U-235. IFBA and Gd{sub 2}O{sub 3} as burnable poisons are used for controlling the excess reactivity and to flatten the power distribution. The calculations using MCNPX showed that the PWR will discharge the fuel with average burnup of 31.8 MWd/kgU after 1000 effective full power days. Assuming a 95 days plant outage, 36 calendar months can be achieved with a capacity factor of 91.3%. Good power distribution in the core is obtained during the cycle and the required critical boron concentration is less than 1750 ppm. Recycling of the discharged CANDU fuel bundles that represents 85% of the fuel in the assembly, in CANDU-6 or in 700 MWe Advanced CANDU Reactor (ACR-700), an additional burnup of about 31 or 26 MWd/kgU burnup can be achieved, respectively. Averaging the fuel burnup on the all fuel in the PWR

  17. Twenty-five years of transient counting experience in French PWR units

    Energy Technology Data Exchange (ETDEWEB)

    Barthelet, B. [Electricite de France (EDF DPN), 93 - Saint-Denis (France); Savoldelli, D.; Fritz, R. [Electricite de France (EDF DPN), 93 - Noisy le Grand (France)

    2001-07-01

    For nearly twenty five years, EDF has been checking that the actual operating transients are neither more severe nor more numerous than the design basis transients. This activity of transient cycle counting and bookkeeping has enabled EDF to own a database of more than 800 reactor.years for the PWR units. The current method of transient cycle counting is presented. In the paper, we will point out the main results of transient cycle counting and lessons learned. In general, the frequencies of transients are lower than the design frequencies. In few cases, they are higher, such as the transient frequencies of the RCS lines connected to auxiliary systems often due to operating procedures or particular periodic testing. Few periodic tests were not taken into account in the design basis transient file ; they have been detected thanks to the transient cycle counting. In the last 1980's, we achieved the first updating of the design basis transient file for the PWR 900 MWe series. In the early 1990's, we updated the design basis transient file of the PWR 1300 MWe series. In fact, since design and start-up, the operating conditions have been modified (fuel cycle with stretch-out, modification of the hot leg and cold leg temperatures for the PWR 1300 MWe,...). This was the cause of many unclassified transients. In the new design basis transient file, we have created new transients and increased the frequencies of some of them. This has enabled to consider the updated design basis transient file more representative of actual operating transients. For some years, we have increasingly associated the operators with the transient cycle counting concern. We noticed progress (decreased frequencies of most transients). (authors)

  18. Twenty-five years of transient counting experience in French PWR units

    International Nuclear Information System (INIS)

    Barthelet, B.; Savoldelli, D.; Fritz, R.

    2001-01-01

    For nearly twenty five years, EDF has been checking that the actual operating transients are neither more severe nor more numerous than the design basis transients. This activity of transient cycle counting and bookkeeping has enabled EDF to own a database of more than 800 reactor.years for the PWR units. The current method of transient cycle counting is presented. In the paper, we will point out the main results of transient cycle counting and lessons learned. In general, the frequencies of transients are lower than the design frequencies. In few cases, they are higher, such as the transient frequencies of the RCS lines connected to auxiliary systems often due to operating procedures or particular periodic testing. Few periodic tests were not taken into account in the design basis transient file ; they have been detected thanks to the transient cycle counting. In the last 1980's, we achieved the first updating of the design basis transient file for the PWR 900 MWe series. In the early 1990's, we updated the design basis transient file of the PWR 1300 MWe series. In fact, since design and start-up, the operating conditions have been modified (fuel cycle with stretch-out, modification of the hot leg and cold leg temperatures for the PWR 1300 MWe,...). This was the cause of many unclassified transients. In the new design basis transient file, we have created new transients and increased the frequencies of some of them. This has enabled to consider the updated design basis transient file more representative of actual operating transients. For some years, we have increasingly associated the operators with the transient cycle counting concern. We noticed progress (decreased frequencies of most transients). (authors)

  19. Advanced high conversion PWR: preliminary analysis

    International Nuclear Information System (INIS)

    Golfier, H.; Bellanger, V.; Bergeron, A.; Dolci, F.; Gastaldi, B.; Koberl, O.; Mignot, G.; Thevenot, C.

    2007-01-01

    In this paper, physical aspects of a HCPWR (High Conversion Light Water Reactor), which is an innovative PWR fuelled with mixed oxide and having a higher conversion ratio due to a lower moderation ratio. Moderation ratios lower than unity are considered which has led to low moderation PWR fuel assembly designs. The objectives of this parametric study are to define a feasibility area with regard to the following neutronic aspects: moderation ratio, Pu loading, reactor spectrum, irradiation time, and neutronic coefficients. Important thermohydraulic parameters are the pressure drop, the critical heat flux, the maximum temperature in the fuel rod and the pumping power. The thermohydraulic analysis shows that a range of moderation ratios from 0.8 to 1.2 is technically possible. A compromise between improved fuel utilization and research and development effort has been found for the moderation ration of about 1. The parametric study shows that there are 2 ranges of interest for the moderation ratio: -) moderation ratio between 0.8 and 1.2 with reduced fissile heights (> 3 m), hexagonal arrangement fuel assembly and square arrangement fuel assembly are possible; and -) moderation between 0.6 and 0.7 with a modification of the reactor operating conditions (reduction of the primary flow and of the thermal power), the fuel rods could be arranged inside a hexagonal fuel rod assembly. (A.C.)

  20. Flexibility of ADS for minor actinides transmutation in different two-stage PWR-ADS fuel cycle scenarios

    International Nuclear Information System (INIS)

    Zhou, Shengcheng; Wu, Hongchun; Zheng, Youqi

    2018-01-01

    Highlights: •ADS reloading scheme is optimized to raise discharge burnup and lower reactivity loss. •ADS is flexible to be combined with various pyro-chemical reprocessing technologies. •ADS is flexible to transmute MAs from different spent PWR fuels. -- Abstract: A two-stage Pressurized Water Reactor (PWR)-Accelerator Driven System (ADS) fuel cycle is proposed as an option to transmute minor actinides (MAs) recovered from the spent PWR fuels in the ADS system. At the second stage, the spent fuels discharged from ADS are reprocessed by the pyro-chemical process and the recovered actinides are mixed with the top-up MAs recovered from the spent PWR fuels to fabricate the new fuels used in ADS. In order to lower the amount of nuclear wastes sent to the geological repository, an optimized scattered reloading scheme for ADS is proposed to maximize the discharge burnup and lower the burnup reactivity loss. Then the flexibility of ADS for MA transmutation is evaluated in this research. Three aspects are discussed, including: different cooling time of spent ADS fuels before reprocessing, different reprocessing loss of spent ADS fuels, and different top-up MAs recovered from different kinds of spent PWR fuels. The ADS system is flexible to be combined with various pyro-chemical reprocessing technologies with specific spent fuels cooling time and unique reprocessing loss. The reduction magnitudes of the long-term decay heat and radiotoxicity of MAs by transmutation depend on the reprocessing loss. The ADS system is flexible to transmute MAs recovered from different kinds of spent PWR fuels, regardless of UOX or MOX fuels. The reduction magnitudes of the long-term decay heat and radiotoxicity of different MAs by transmutation stay on the same order.

  1. The development of flow test technology for PWR fuel assembly

    International Nuclear Information System (INIS)

    Chung, Moon Ki; Cha, Chong Hee; Chung, Chang Hwan; Chun, Se Young; Song, Chul Hwa; Chung, Heung Joon; Won, Soon Yeun; Cho, Yeong Rho; Kim, Bok Deuk

    1988-05-01

    KAERI has an extensive program to develope PWR fuel assembly. In relation to the program, development of flow test technology is needed to evaluate the thermal hydraulic compactibility and mechanical integrity of domestically fabricated nuclear fuels. A high-pressure and high-temperature flow test facility was designed to test domestically fabricated fuel assembly. The test section of the facility has capacity of a 6x6 full length PWR fuel assembly. A flow test rig was designed and installed at Cold Test Loop to carry out model experiments with 5x5 rod assembly under atmosphere pressure to get information about the characteristics of pressure loss of spacer grids and velocity distribution in the subchannels. LDV measuring technology was established using TSI's Laser Dopper Velocimeter 9100-3 System

  2. The plutonium recycle for PWR reactors from brazilian nuclear program

    International Nuclear Information System (INIS)

    Rubini, L.A.

    1978-01-01

    The purpose of this thesis is to evaluate the material requirements of the nuclear fuel cycle with plutonium recycle. The study starts with the calculation of a reference reactor and has flexibility to evaluate the demand under two alternatives of nuclear fuel cycle for Pressurized Water Reactors (PWR): Without plutonium recycle; and with plutonium recycle. Calculations of the reference reactor have been carried out with the CELL-CORE codes. Variations in the material requirements were studied considering changes in the installed nuclear capacity of PWR reactors, the capacity factor of these reactors, and the introduction of fast breeders. Recycling plutonium produced inside the system can reach economies of about 5% U 3 O 8 and 6% separative work units if recycle is assumed only after the fifth operation cycle of the thermal reactors. (author)

  3. RNL NDT studies related to PWR pressure vessel inlet nozzle inspection

    International Nuclear Information System (INIS)

    Rogerson, A.; Poulter, L.N.J.; Clough, P.; Cooper, A.

    1984-01-01

    Non-destructive examinations of the Reactor Pressure Vessel (RPV) of a Pressurized Water Reactor (PWR) play an important role in assuring vessel integrity throughout its operational life. Automated ultrasonic techniques for the detection and sizing of flaws in thick-section seam welds and near-surface regions in a PWR RPV have been under development at RNL for some time. Techniques for the inspection of complex geometry welds and other regions of the vessel are now being assessed and further developed as part of the UK NDT development programme in support of the Sizewell PWR. One objective of this programme is to demonstrate that the range of ultrasonic techniques already shown to be effective for the inspection of seam welds and inlet nozzle corner regions, through exercises such as the Defect Detection Trials, can also be effective for inspection of these other vessel regions. The nozzle-to-vessel welds and nozzle crotch corners associated with the RPV water inlet and outlet nozzles are two such regions being examined in this programme. In this paper, a review is given of the work performed at RNL in the development of a laboratory-based inspection system for inlet nozzle inspection. The main features of the system in its current stage of development are explained. (author)

  4. Characterization of Decommissioned PWR Vessel Internals Material Samples: Tensile and SSRT Testing (Nonproprietary Version)

    International Nuclear Information System (INIS)

    Krug, M.; Shogan, R.

    2004-01-01

    Pressurized water reactor (PWR) cores operate under extreme environmental conditions due to coolant chemistry, operating temperature, and neutron exposure. Extending the life of PWRs requires detailed knowledge of the changes in mechanical and corrosion properties of the structural austenitic stainless steel components adjacent to the fuel (internals) subjected to such conditions. This project studied the effects of reactor service on the mechanical and corrosion properties of samples of baffle plate, former plate, and core barrel from a decommissioned PWR

  5. Ultrasonic inspection for testing the PWR fuel rod endplug welds

    International Nuclear Information System (INIS)

    Pillet, C.; Destribats, M.T.; Papezyk, F.

    1976-01-01

    A method of ultrasonic testing with local immersion and transversal waves was developed. It is possible to detect defects as the lacks of fusion and penetration and porosity in the PWR fuel rod endplug welds [fr

  6. PWR fuel behavior: lessons learned from LOFT

    International Nuclear Information System (INIS)

    Russell, M.L.

    1981-01-01

    A summary of the experience with the Loss-of-Fluid Test (LOFT) fuel during loss-of-coolant experiments (LOCEs), operational and overpower transient tests and steady-state operation is presented. LOFT provides unique capabilities for obtaining pressurized water reactor (PWR) fuel behavior information because it features the representative thermal-hydraulic conditions which control fuel behavior during transient conditions and an elaborate measurement system to record the history of the fuel behavior

  7. Chemical and radiochemical specifications - PWR power plants

    International Nuclear Information System (INIS)

    Stutzmann, A.

    1997-01-01

    Published by EDF this document gives the chemical specifications of the PWR (Pressurized Water Reactor) nuclear power plants. Among the chemical parameters, some have to be respected for the safety. These parameters are listed in the STE (Technical Specifications of Exploitation). The values to respect, the analysis frequencies and the time states of possible drops are noticed in this document with the motion STE under the concerned parameter. (A.L.B.)

  8. ORNL-PWR BDHT analysis procedure: an overview

    International Nuclear Information System (INIS)

    Cliff, S.B.

    1978-01-01

    The key computer programs currently used by the analysis procedure of the ORNL-PWR Blowdown Heat Transfer Separate Effects Program are overviewed with particular emphasis placed on their interrelationships. The major modeling and calculational programs, COBRA, ORINC, ORTCAL, PINSIM, and various versions of RELAP4, are summarized and placed into the perspective of the procedure. The supportive programs, REDPLT, ORCPLT, BDHTPLOT, OXREPT, and OTOCI, and their uses are described

  9. Studies of a small PWR for onsite industrial power

    International Nuclear Information System (INIS)

    Klepper, O.H.; Smith, W.R.

    1977-01-01

    Information on the use of a 300 to 400 MW(t) PWR type reactor for industrial applications is presented concerning the potential market, reliability considerations, reactor plant description, construction techniques, comparison between nuclear and fossil-fired process steam costs, alternative fossil-fired steam supplies, and industrial application

  10. Layout of the primary circuit with its components for PWR and BWR

    International Nuclear Information System (INIS)

    Meyer, P.J.

    1981-01-01

    The light water-moderated and cooled pressurized water reactors and boiling water reactors constitute the basis of economic utilization of nuclear energy all over the world. Pressurized water reactors up to capacities of 3,800 MWth are those most used for power generation. However, their potential capacities exceed 3,800 MWth, so that already in the near future PWR are conseivable which readily generate 1,500 to 2,000 MWe. The main problem for starting the next generation of PWRs are of safety measure and licensing questions. Interesting applications of the PWRs are nuclear district heating, generation of process steam of desalination plants, steam injection into the ground for oil production or chemical factories. A new generation of natural circulation boiling water reactors with a capacity of 200 to 400 MW will be used for development of small industrial areas or for countries without an integral grid system. The natural circulation boiling water reactor will be subject of a separate lecture. Due to the fact of the majority of the PWR all over the world this lecture will discuss mainly PWR design aspects. (orig./RW)

  11. Burst pressure and leak rate from fretted SG tubes

    International Nuclear Information System (INIS)

    Hwang, Seong Sik; Jung, Man Kyo; Kim, Hong Pyo; Kim, Joung Soo

    2005-01-01

    Steam generator(SG) tubes of a pressurized water reactor(PWR) have suffered from various types of corrosion, such as pitting, wastage and stress corrosion cracking (SCC) on both the primary and secondary side. Recently, fretting/wear degradation at the tube support region has been reported in some Korean nuclear power plants. In order to prevent the primary coolant from leaking to the secondary side, the tubes are repaired by a sleeving or plugging. It is important to establish the repair criteria to assure a reactor integrity and yet maintain the plugging ratio within the limits needed for an efficient operation. The objective of the burst test is to obtain a relationship between the burst/leak rate and the shape of the fretted flaws machined with an electro discharge machining (EDM)

  12. Characterization of Decommissioned PWR Vessel Internals Materials Samples: Material Certification, Fluence, and Temperature (Nonproprietary Version)

    International Nuclear Information System (INIS)

    Krug, M.; Shogan, R.; Fero, A.; Snyder, M.

    2004-01-01

    Pressurized water reactor (PWR) cores, operate under extreme environmental conditions due to coolant chemistry, operating temperature, and neutron exposure. Extending the life of PWRs require detailed knowledge of the changes in mechanical and corrosion properties of the structural austenitic stainless steel components adjacent to the fuel. This report contains basic material characterization information of the as-installed samples of reactor internals material which were harvested from a decommissioned PWR

  13. Material property changes of stainless steels under PWR irradiation

    International Nuclear Information System (INIS)

    Fukuya, Koji; Nishioka, Hiromasa; Fujii, Katsuhiko; Kamaya, Masayuki; Miura, Terumitsu; Torimaru, Tadahiko

    2009-01-01

    Structural integrity of core structural materials is one of the key issues for long and safe operation of pressurized water reactors. The stainless steel components are exposed to neutron irradiation and high-temperature water, which cause significant property changes and irradiation assisted stress corrosion cracking (IASCC) in some cases. Understanding of irradiation induced material property changes is essential to predict integrity of core components. In the present study, microstructure and microchemistry, mechanical properties, and IASCC behavior were examined in 316 stainless steels irradiated to 1 - 73 dpa in a PWR. Dose-dependent changes of dislocation loops and cavities, grain boundary segregation, tensile properties and fracture mode, deformation behavior, and their interrelation were discussed. Tensile properties and deformation behavior were well coincident with microstructural changes. IASCC susceptibility under slow strain rate tensile tests, IASCC initiation under constant load tests in simulated PWR primary water, and their relationship to material changes were discussed. (author)

  14. Prevention and mitigation of steam-generator water-hammer events in PWR plants

    International Nuclear Information System (INIS)

    Han, J.T.; Anderson, N.

    1982-11-01

    Water hammer in nuclear power plants is an unresolved safety issue under study at the NRC (USI A-1). One of the identified safety concerns is steam generator water hammer (SGWH) in pressurized-water reactor (PWR) plants. This report presents a summary of: (1) the causes of SGWH; (2) various fixes employed to prevent or mitigate SGWH; and (3) the nature and status of modifications that have been made at each operating PWR plant. The NRC staff considers that the issue of SGWH in top feedring designs has been technically resolved. This report does not address technical findings relevant to water hammer in preheat type steam generators. 10 figures, 2 tables

  15. Acceptance test for 900 MWe PWR unit replacement steam generators

    International Nuclear Information System (INIS)

    Gourguechon, B.

    1993-01-01

    During the first half of 1994, the Gravelines 1 steam generators will be replaced (SG replacement procedure). The new SG's differ from the former components notably by the alloy used for the tube bundle, in this case, the high chromium content Inconel 690. So, from this standpoint, they are to be considered as PWR 900 replacement SG first models and their thermal efficiency has consequently to be assessed. This will provide an opportunity of ensuring that the performance of the components delivered is in compliance with requirements and of making the necessary provisions if significant deviations are observed. The EFMT branch, which has been in charge of the instrumentation and acceptance of the different SG first models since the first PWR plants were commissioned, will be responsible for the acceptance tests and the ultimate validation of a performance assessment procedure applicable to the future replacement steam generators. The methods and tests proposed for SG expert appraisal are based on consideration of the importance of primary measurement quality for satisfactory SG assessment and of the new test facilities with which the 900 and 1 300 PWR plants are gradually being equipped. These facilities provide an on-site computer environment for tests compatible with the tools (PATTERN, etc.) used at EFMT and in other departments. This test is the first of this kind performed by EFMT and the test facility of a nuclear power plant. (author). 6 figs

  16. Environmental surveillance of PWR power stations

    International Nuclear Information System (INIS)

    Conti, M.

    1980-01-01

    The action of Electricite de France with respect to the environment of PWR nuclear power stations is essentially centred on prevention. Controls are carried out at two levels: - before the power station goes on stream (radioecological study), - when the power station is operational. The purpose of the controls effected on the radioactive effluents and the environment is to check that the maximum discharge rate stipulated in the corresponding orders is complied with and to ensure that there are no anomalies in the environment [fr

  17. Numerical analysis of APR1400 Steam Generator by CUPID/MARS heat structure coupling

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Ryong Lee; Lee, Seung Jun; Pakr, Ik Kyu; Yoon, Han Young [KAERI, Daejeon (Korea, Republic of); Cho, Hyoung Kyu [Seoul National University, Seoul (Korea, Republic of)

    2015-05-15

    To design and analyze steam generators, many computer codes have been developed and used around the world. In this study, the coupled CUPID and MARS code was used for the simulation of boiler side of the PWR steam generator. This paper presents the description of the coupling method, validation for porous media approach against the rod bundle experiment and the preliminary simulation results of PWR steam generator using the coupled code. In the present study, the multi-scale thermal-hydraulic analysis method using the coupled CUPID/MARS code was applied for the simulation of the steam generator. The primary side of the steam generator and other RCS was simulated by MARS and the secondary side was calculated by CUPID with porous media approach. For coupled simulation, the porous medium was applied in order to take into account the effect of the U-tube bundle and other supporting structure which play a role to be a flow resistance. More realistic physical model such as moisture separator slug behavior should be developed for the near future. The application of the coupled simulation should be extended to the accident scenario.

  18. A nodal model for the simulation of a PWR core

    International Nuclear Information System (INIS)

    Souza Pinto, R. de.

    1981-06-01

    A computer program FORTRAN language was developed to simulate the neutronic and thermal-hydraulic transient behaviour of a PWR reactor core. The reator power is calculated using a point kinectics model with six groups of delayed neutron precursors. The fission product decay heat was considered assuming three effective decay heat groups. A nodal model was employed for the treatment of heat transfer in the fuel rod, with integration of the heat equation by the lumped parameter technique. Axial conduction was neglected. A single-channel nodal model was developed for the thermo-hydrodynamic simulation using mass and energy conservation equations for the control volumes. The effect of the axial pressure variation was neglected. The computer program was tested, with good results, through the simulation of the transient behaviour of postulated accidents in a typical PWR. (Author) [pt

  19. Low cycle fatigue behavior of hot-bent 347 stainless steel in a simulated PWR water environment

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jun Ho; Seo, Myung Gyu; Jang, Chang Heui [Dept. of Nuclear and Quantum Engineering, Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Hong, Jong Tae [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Tae Soon [Central Research InstituteKorea Hydro and Nuclear Power Co., Ltd., Daejeon (Korea, Republic of)

    2016-11-15

    The effect of hot bending on the Low cycle fatigue (LCF) behavior of 347 SS was evaluated in Room temperature (RT) air and simulated Pressurized water reactor (PWR) water environments. The LCF life of 347 SS in PWR water was shorter than that in RT air for the as-received and hot-bent conditions. The LCF life of hot-bent 347 SS was relatively longer than that of the as-received condition in both RT air and PWR water. Microstructure analysis indicated development of dislocation structure near niobium carbide particles and increase in dislocation density for the hot-bent 347 SS. Such microstructure acted as barriers to dislocation movement during the LCF test, resulting in minimal hardening for the hot-bent 347 SS in RT air.

  20. Development of built-in debris-filter bottom nozzle for PWR fuel assemblies

    International Nuclear Information System (INIS)

    Juntaro Shimizu; Kazuki Monaka; Masaji Mori; Kazuo Ikeda

    2005-01-01

    Mitsubishi Heavy Industries, Ltd. (MHI) has worked to improve the capability of anti debris bottom nozzle for a PWR fuel assembly. The Current debris filter bottom nozzle (DFBN) having 4mm diameter flow holes can capture the larger size of debris than the flow hole inner diameter. MHI has completed the development of the built-in debris filter bottom nozzle, which is the new idea of the debris-filter for high burnup (55GWd/t assembly average burnup). Built-in debris filter bottom nozzle consists of the blades and nozzle body. The blades made from inconel strip are embedded and welded on the grooved top surface of the bottom nozzle adapter plate. A flow hole is divided by the blade and the trap size of the debris is reduced. Because the blades block the coolant flow, it was anticipated to increase the pressure loss of the nozzle, however, adjusting the relation between blade and taper shape of the flow hole, the pressure loss has been successfully maintained the satisfactory level. Grooves are cut on the nozzle plate; nevertheless, the additional skirts on the four sides of the nozzle compensate the structural strength. (authors)

  1. Four-fluid model of PWR degraded cores

    International Nuclear Information System (INIS)

    Dearing, J.F.

    1985-01-01

    This paper describes the new two-dimensional, four-fluid fluid dynamics and heat transfer (FLUIDS) module of the MELPROG code. MELPROG is designed to give an integrated, mechanistic treatment of pressurized water reactor (PWR) core meltdown accidents from accident initiation to vessel melt-through. The code has a modular data storage and transfer structure, with each module providing the others with boundary conditions at each computational time step. Thus the FLUIDS module receives mass and energy source terms from the fuel pin module, the structures module, and the debris bed module, and radiation energy source terms from the radiation module. MELPROG, which models the reactor vessel, is also designed to model the vessel as a component in the TRAC/PF1 networking solution of a PWR reactor coolant system (RCS). The coupling between TRAC and MELPROG is implicit in the fluid dynamics of the reactor coolant (liquid water and steam) allowing an accurate simulation of the coupling between the vessel and the rest of the RCS during an accident. This paper deals specifically with the numerical model of fluid dynamics and heat transfer within the reactor vessel, which allows a much more realistic simulation (with less restrictive assumptions on physical behavior) of the accident than has been possible before

  2. Some thermalhydraulics of closure head adapters in a 3 loops PWR

    Energy Technology Data Exchange (ETDEWEB)

    Hoffmann, F.; Daubert, O.; Hecker, M. [EDF/DER/National Hydraulics Laboratory, Chatou (France)] [and others

    1995-09-01

    In 1993 a R&D action, based on numerical simulations and experiments on PWR`s upper head was initiated. This paper presents the test facility TRAVERSIN (a scale model of a 900 MW PWR adapter) and the calculations performed on the geometry of different upper head sections with the Thermalhydraulic Finite Element Code N3S used for 2D and 3D computations. The paper presents the method followed to bring the adapter and upper head study to a successful conclusion. Two complementary approaches are performed to obtain global results on complete fluid flow in the upper head and local results on the flow around the adapters of closure head. A validation test case of these experimental and numerical tools is also presented.

  3. Power ramp testing method for PWR fuel rod at research reactor

    International Nuclear Information System (INIS)

    Zhou Yidong; Zhang Peisheng; Zhang Aimin; Gao Yongguang; Wang Huarong

    2003-01-01

    A tentative power ramp test for short PWR fuel rod has been conducted at the Heavy Water Research Reactor (HWRR) in China Institute of Atomic Energy (CIAE). The test fuel rod was cooled by the circulating water in the test loop. The power ramp was realized by moving solid neutron-absorbing screen around the fuel rod. The linear power of the fuel rod increased from 220 W/cm to 340 W/cm with a power ramp rate of 20 W/cm/min. The power of the fuel rod was monitored by both in-core thermal and nuclear measurement sensors in the test rig. This test provides experiences for further developing the power ramp test methods for PWR fuel rods at research reactor. (author)

  4. The new French code for PWR in service inspection

    Energy Technology Data Exchange (ETDEWEB)

    Noel, R; Hutin, J P [Electricite de France (EDF), 75 - Paris (France)

    1988-12-31

    This document presents the new french code for pressured water reactor in service inspection. The historic regulatory basis is presented, together with the new regulatory act (dating back to the 26 february 1974) and the major guidelines of the french practice for in service inspection of PWR components. (TEC).

  5. Development a computer codes to couple PWR-GALE output and PC-CREAM input

    Science.gov (United States)

    Kuntjoro, S.; Budi Setiawan, M.; Nursinta Adi, W.; Deswandri; Sunaryo, G. R.

    2018-02-01

    Radionuclide dispersion analysis is part of an important reactor safety analysis. From the analysis it can be obtained the amount of doses received by radiation workers and communities around nuclear reactor. The radionuclide dispersion analysis under normal operating conditions is carried out using the PC-CREAM code, and it requires input data such as source term and population distribution. Input data is derived from the output of another program that is PWR-GALE and written Population Distribution data in certain format. Compiling inputs for PC-CREAM programs manually requires high accuracy, as it involves large amounts of data in certain formats and often errors in compiling inputs manually. To minimize errors in input generation, than it is make coupling program for PWR-GALE and PC-CREAM programs and a program for writing population distribution according to the PC-CREAM input format. This work was conducted to create the coupling programming between PWR-GALE output and PC-CREAM input and programming to written population data in the required formats. Programming is done by using Python programming language which has advantages of multiplatform, object-oriented and interactive. The result of this work is software for coupling data of source term and written population distribution data. So that input to PC-CREAM program can be done easily and avoid formatting errors. Programming sourceterm coupling program PWR-GALE and PC-CREAM is completed, so that the creation of PC-CREAM inputs in souceterm and distribution data can be done easily and according to the desired format.

  6. T Plant removal of PWR Chiller Subsystem

    International Nuclear Information System (INIS)

    Dana, C.M.

    1994-01-01

    The PWR Pool Chiller System is not longer required for support of the Shippingport Blanket Fuel Assemblies Storage. The Engineering Work Plan will provide the overall coordination of the documentation and physical changes to deactivate the unneeded subsystem. The physical removal of all energy sources for the Chiller equipment will be covered under a one time work plan. The documentation changes will be covered using approved Engineering Change Notices and Procedure Change Authorizations as needed

  7. Fatigue analysis of a PWR steam generator tube sheet

    International Nuclear Information System (INIS)

    Billon, F.; Buchalet, C.; Poudroux, G.

    1985-01-01

    The fatigue analysis of a PWR steam generator (S.G) tube sheet is threefold. First, the flow, pressure and temperature variations during the design transients are defined for both the primary fluid and the normal and auxiliary feedwater. Second, the flow, velocities, pressure and temperature variations of the secondary fluid at the bottom of the downcomer and above the tube sheet are determined for the transients considered. Finally, the corresponding temperatures and stresses in the tube sheet are calculated and the usage factors determined at various locations in the tube sheet. The currently available standard design transients for the primary fluid and the feedwater are too conservative to be utilized as such in the fatigue analysis of the S.G. tube sheets. Thus, a detailed examination and reappraisal of each operating transient was performed. The revised design conditions are used as inputs to the calculation model TEMPTRON. TEMPTRON determines the mixing conditions between the feedwater and the recirculation fluid from the S.G. feedwater nozzles to the center of the tube sheet via the downcomer. The fluid parameters, flow rate and velocity, temperature and pressure variations, as a function of the time during the transients are obtained. Finally, the usage factors at various locations on the tube sheet are derived using the standard ASME section III method

  8. Analytical technical of lightning surges induced on grounding mesh of PWR nuclear power plant

    International Nuclear Information System (INIS)

    Ikeda, I.; Tani, M.; Yonezawa, T.

    1990-01-01

    An analytical lightning surge technique is needed to make a qualitative and predictive evaluation of transient voltages induced on local grounding meshes and instrumentation cables by a lightning strike on a lightning rod in a PWR plant. This paper discusses an experiment with lightning surge impulses in a PWR plant which was setup to observe lightning caused transient voltages. Experimental data when compared with EMTP simulation results improved the simulation method. The improved method provides a good estimation of induced voltages on grounding meshes and instrumentation cables

  9. Transient study of a PWR pressurizer

    International Nuclear Information System (INIS)

    Sotoma, H.

    1973-01-01

    An appropriate method for the calculation and transient performance of the pressurizer of a pressurized water reactor is presented. The study shows a digital program of simulation of pressurizer dynamics based on the First Law of Thermodynamic and Laws of Heat and Mass Transfer. The importance of the digital program that was written for a pressurizer of PWR, lies in the fact that, this can be of practical use in the safety analysis of a reactor of Angra dos Reis type with a power of about 500 M We. (author)

  10. Steam Generator Chemical Cleaning Application: Korean Experience in PWR NPP

    International Nuclear Information System (INIS)

    Hwang, In-Ho; Varrin-Jr, Robert-D.; Little, Michael-J.; Oh, Yeon-Ok; Choo, Seong-Jib; Park, Jin-Hyeok

    2012-09-01

    Korea Hydro and Nuclear Power (KHNP) performed an EPRI/SGOG chemical cleaning of the secondary side of the steam generators at Ulchin Unit 3 (UCN3) in March 2011 and at Ulchin Unit 4 (UCN4) in September 2011. The steam generator chemical cleaning (SGCC) was performed with venting at the top-of-tube sheet (TTS) and at tube support plates (TSPs) 4, 5, 6, 7, 8, 9, and 10. A primary objective of this SGCC was to address outer diameter stress corrosion cracking (ODSCC), which has been observed at the TTS and TSPs in the UCN3 SGs. The EPRI/SGOG process has been shown to effectively reduce prevailing ODSCC rates at the TTS and TSPs, particularly when applied with periodic venting in this application. This was the first full-length SGCC campaign with venting performed in Korea. Ulchin Unit 3 commenced commercial operation in August 1998 and Ulchin Unit 4 commenced commercial operation in December 1999. UCN3 and UCN4 are a two-loop pressurized water reactor (PWR) of the Korea Standard Nuclear Plant (KSNP) design. The SGs contain high-temperature mill annealed (HTMA) Alloy 600 tubing and are similar in design to the Combustion Engineering CE-80. The KSNP SGs have been susceptible to outer diameter stress corrosion cracking (ODSCC), which is consistent with operating experience for other SGs containing Alloy 600HTMA tubing material. The UCN3/4 SGs have recently begun to experience ODSCC. Hankook Jungsoo Industries Co., Ltd (HaJI) was selected as the cleaning vendor by KHNP. To date, HaJI has completed five Advanced Scale Conditioning Agent (ASCA) cleaning applications and two EPRI/SGOG Steam Generator Chemical Cleaning (SGCC) campaigns for KHNP. The goal of total deposit removal of the applications were successfully achieved and the amounts are 3,579 kg at UCN3 and 3,786 kg at UCN4 which values were estimated before each cleaning by analysing ECT signal and liquid samples from the SGs. The deposits from the SGs were primarily composed of magnetite. There were no chemical

  11. ASN takes position in the in-service follow-up programs of primary and secondary loops of EdF's nuclear power plants

    International Nuclear Information System (INIS)

    2002-01-01

    This decision from the French authority of nuclear safety (ASN) aims at fixing the conditions to be respected by Electricite de France (EdF) during its in-service follow-up programs for the monitoring and preventive maintenance of the primary and secondary cooling loops of EdF's PWR reactors. The components and the particular points to be controlled are listed in appendixes. (J.S.)

  12. Method of characteristics - Based sensitivity calculations for international PWR benchmark

    International Nuclear Information System (INIS)

    Suslov, I. R.; Tormyshev, I. V.; Komlev, O. G.

    2013-01-01

    Method to calculate sensitivity of fractional-linear neutron flux functionals to transport equation coefficients is proposed. Implementation of the method on the basis of MOC code MCCG3D is developed. Sensitivity calculations for fission intensity for international PWR benchmark are performed. (authors)

  13. Degradation of fastener in reactor internal of PWR

    Energy Technology Data Exchange (ETDEWEB)

    Kim, D. W.; Ryu, W. S.; Jang, J. S.; Kim, S. H.; Kim, W. G.; Chung, M. K.; Han, C. H

    2000-03-01

    Main component degraded in reactor internal structure of PWR is fastener such as bolts, stud, cap screw, and pins. The failure of these components may damage nuclear fuel and limits the operation of nuclear reactor. In foreign reactors operated more than 10 years, an increasing number of incidents of degraded thread fasteners have been reported. The degradation of these components impair the integrity of reactor internal structure and limit the life extension of nuclear power plant. To solve the problem of fastener failure, the incidents of failure and main mechanisms should be investigated. the purpose of this state-of-the -art report is to investigate the failure incidents and mechanisms of fastener in foreign and domestic PWR and make a guide to select a proper materials. There is no intent to describe each event in detail in this report. This report covers the failures of fastener and damage mechanisms reported by the licensees of operating nuclear power plants and the applications of plants constructed after 1964. This information is derived from pertinent licensee event report, reportable occurrence reports, operating reactor event memoranda, failure analysis reports, and other relevant documents. (author)

  14. Teknologi Pembuatan Cermet Du0¬2 - Steel Untuk Wadah Limbah Bahan Bakar Bekas Pwr

    OpenAIRE

    Alimah, Siti; Budiarto, Budiarto

    2005-01-01

    DUO­2-STEEL CERMET MANUFACTURING TECHNOLOGY FOR PWR Spent Nuclear Fuel (SNF) CASKS. Assessment of DU02 - Steel cermet manufacturing technology for PWR SNF casks has been done. DU02 - Steel cermet consisting of DU02 particulates and other particulates, embedded in a steel matrix. Cermet SNF casks have the potential for superior performance compared with casks constructed of other materials. The addition of DU02 ceramic particulates can increase SNF cask capacity, improve of repository performa...

  15. Polynomial parameterized representation of macroscopic cross section for PWR reactor

    International Nuclear Information System (INIS)

    Fiel, Joao Claudio B.

    2015-01-01

    The purpose of this work is to describe, by means of Tchebychev polynomial, a parameterized representation of the homogenized macroscopic cross section for PWR fuel element as a function of soluble boron concentration, moderator temperature, fuel temperature, moderator density and 235 U 92 enrichment. Analyzed cross sections are: fission, scattering, total, transport, absorption and capture. This parameterization enables a quick and easy determination of the problem-dependent cross-sections to be used in few groups calculations. The methodology presented here will enable to provide cross-sections values to perform PWR core calculations without the need to generate them based on computer code calculations using standard steps. The results obtained by parameterized cross-sections functions, when compared with the cross-section generated by SCALE code calculations, or when compared with K inf , generated by MCNPX code calculations, show a difference of less than 0.7 percent. (author)

  16. Is it possible to improve regulation system of PWR

    International Nuclear Information System (INIS)

    Bonnemay, A.; Martinez, J.M.

    1983-03-01

    This paper deals with two problems: first of all, it presents the critical analysis of usually implemented general regulation systems, on PWR plants, and derives from it same possibilities to improve the transient behavior of reactor, the second part is a proposition from an automatic control system for spatial distribution of flux

  17. Performance of PWR Nuclear power plants, up to 1985

    International Nuclear Information System (INIS)

    Muniz, A.A.

    1987-01-01

    The performance of PWR nuclear power plants is studied, based on operational data up to 1985. The availability analysis was made with 793 unit-year and the reliability analysis was made with 5851 unit x month. The results were discussed and the availability of those nuclear power plants were estimated. (E.G.) [pt

  18. Post irradiation examination on test fuel pins for PWR

    International Nuclear Information System (INIS)

    Fogaca Filho, N.; Ambrozio Filho, F.

    1981-01-01

    Certain aspects of irradiation technology on test fuel pins for PWR, are studied. The results of post irradiation tests, performed on test fuel pins in hot cells, are presented. The results of the tests permit an evaluation of the effects of irradiation on the fuel and cladding of the pin. (Author) [pt

  19. Life management plants at nuclear power plants PWR; Planes de gestion de vida en centrales nucleares PWR

    Energy Technology Data Exchange (ETDEWEB)

    Esteban, G.

    2014-10-01

    Since in 2009 the CSN published the Safety Instruction IS-22 (1) which established the regulatory framework the Spanish nuclear power plants must meet in regard to Life Management, most of Spanish nuclear plants began a process of convergence of their Life Management Plants to practice 10 CFR 54 (2), which is the current standard of Spanish nuclear industry for Ageing Management, either during the design lifetime of the plant, as well as for Long-Term Operation. This article describe how Life Management Plans are being implemented in Spanish PWR NPP. (Author)

  20. Control in fabrication of PWR and BWR type reactor fuel elements

    International Nuclear Information System (INIS)

    Gorskij, V.V.

    1981-01-01

    Both destructive and non-destructive testing methods now in use in fabrication of BWR and PWR type reactor fuel elements at foreign plants are reviewed. Technological procedures applied in fabrication of fuel elements and fuel assemblies are described. Major attention is paid to radiographic, ultrasonic, metallographic, visual and autoclavic testings. A correspondence of the methods applied to the ASTM standards is discussed. The most part of the countries are concluded the apply similar testing methods enabling one to reliably evaluate the quality of primary materials and fabricated fuel elements and thus meeting the demands to contemporary PWR and BWR type reactor fuel elements. Practically all fuel element and pipe fabrication plants in Western Europe, Asia and America use the ASTM standards as the basis for the quality contr [ru

  1. The empirical intensity of PWR primary coolant pumps failure and repair

    International Nuclear Information System (INIS)

    Milivojevicj, S.; Riznicj, J.

    1988-01-01

    The wealth of operating experience concerning PWR type and nuclear reactors that has been regularly monitored and systematically processes since 1971, enabled an analysis of the PWR primary coolant pumps operation. Failure intensity α and repair intensity μ of the pump during its working life were calculated, as these values are necessary in order to determine the reliability and availability of the pump as the basis for analyzing its effect on the safety and efficiency of the nuclear power plant. The trend of failure intensity α follows the theoretically expected changes in α over time, and this is around 10 -5 in the majority of life-time. Repair intensity μ indicates a slow rise during life-time, i.e. its faster return to operation. (author).7 refs.; 5 figs

  2. GAIA: AREVAs New PWR fuel assembly design

    Energy Technology Data Exchange (ETDEWEB)

    Vollmert, N.; Gentet, G.; Louf, P.H.; Mindt, M.; O' Brian, J.; Peucker, J.

    2015-07-01

    GAIA is the label of a new PWR Fuel Assembly design developed by AREVA with the objective to provide its customers an advanced fuel assembly design regarding both robustness and performance. Since 2012 GAIA lead fuel assemblies are under irradiation in a Swedish reactor and since 2015 in a U.S. reactor. Visual inspections and examinations carried out so far during the outages confirmed the intended reliability, robustness and the performance enhancement of the design. (Author)

  3. New technical knowledge to be implemented to the revision of rules on pipe wall thinning management for PWR plants

    International Nuclear Information System (INIS)

    Hirai, Junya; Nakamura, Takao; Amano, Yoichi

    2013-01-01

    Rules for PWR plant pipe wall thinning management were formulated by the Japan Society of Mechanical Engineers in 2006. Since then thinning management of Japanese PWR plants has been carried out based on this rule. Pipe wall thinning phenomena to be dealt with in this rule have been identified in many piping components of power plants. New technical knowledge has been accumulated since the issuance of 2006 edition. We have formulated these knowledge and information about the thinning phenomena in PWR power plants. Given the history of application of this rule, we have to make our best effort to carry out a study of latest technical knowledge and implement them to the revision of rule and improve pipe wall thinning management. This paper summarizes the new technical knowledge and basis to be implemented to the revision of rules on pipe wall thinning management for PWR plants in Japan. (author)

  4. Effect of water chemistry improvement on flow accelerated corrosion in light-water nuclear reactor

    International Nuclear Information System (INIS)

    Sugino, Wataru; Ohira, Taku; Nagata, Nobuaki; Abe, Ayumi; Takiguchi, Hideki

    2009-01-01

    Flow Accelerated Corrosion (FAC) of Carbon Steel (CS) piping has been one of main issues in Light-Water Nuclear Reactor (LWRs). Wall thinning of CS piping due to FAC increases potential risk of pipe rupture and cost for inspection and replacement of damaged pipes. In particular, corrosion products generated by FAC of CS piping brought steam generator (SG) tube corrosion and degradation of thermal performance, when it intruded and accumulated in secondary side of PWR. To preserve SG integrity by suppressing the corrosion of CS, High-AVT chemistry (Feedwater pH9.8±0.2) has been adopted to Tsuruga-2 (1160 MWe PWR, commercial operation in 1987) in July 2005 instead of conventional Low-AVT chemistry (Feedwater pH 9.3). By the High-AVT adoption, the accumulation rate of iron in SG was reduced to one-quarter of that under conventional Low-AVT. As a result, a tendency to degradation of the SG thermal efficiency was improved. On the other hand, it was clarified that High-AVT is ineffective against Flow Accelerated Corrosion (FAC) at the region where the flow turbulence is much larger. By contrast, wall thinning of CS feed water pipes due to FAC has been successfully controlled by oxygen treatment (OT) for long time in BWRs. Because Magnetite film formed on CS surface under AVT chemistry has higher solubility and porosity in comparison with Hematite film, which is formed under OT. In this paper, behavior of the FAC under various pH and dissolved oxygen concentration are discussed based on the actual wall thinning rate of BWR and PWR plant and experimental results by FAC test-loop. And, it is clarified that the FAC is suppressed even under extremely low DO concentration such as 2ppb under AVT condition in PWR. Based on this result, we propose the oxygenated water chemistry (OWC) for PWR secondary system which can mitigate the FAC of CS piping without any adverse effect for the SG integrity. Furthermore, the applicability and effectiveness of this concept developed for FAC

  5. ORNL: PWR-BDHT analysis procedure, a preliminary overview

    International Nuclear Information System (INIS)

    Cliff, S.B.

    1978-01-01

    The computer programs currently used in the analysis of the ORNL-PWR Blowdown Heat Transfer Separate-Effects Program are overviewed. The current linkages and relationships among the programs are given along with general comments about the future directions of some of these programs. The overview is strictly from the computer science point of view with only minimal information concerning the engineering aspects of the analysis procedure

  6. Study of PWR reactor efficiency as a function of turbine steam extractions; Estudo da otimizacao da eficiencia de reator PWR em funcao das extracoes de vapor da turbina

    Energy Technology Data Exchange (ETDEWEB)

    Rocha, Janine Gandolpho da; Alvim, Antonio Carlos Marques; Martinez, Aquilino Senra [Universidade Federal, Rio de Janeiro, RJ (Brazil). Coordenacao dos Programas de Pos-graduacao de Engenharia. Programa de Engenharia Nuclear

    2002-07-01

    The objective of this work is to optimize the extractions of the low-pressure turbine of a PWR nuclear reactor, in order to obtain the best thermodynamic cycle efficiency. We have analyzed typical data of a 1300 MW PWR reactor, operating at 25%, 50%, 75% and 100% capacities, respectively. The first stage of this study consists of generating a mathematical model capable of describing the reactor behavior and efficiency at any power level. The second stage of this study consists of to combine the generated mathematical model in an optimization computer program that optimize the extractions flow of the low-pressure turbine until it finds the optimal system efficiency. This work does not alter the nuclear facility project in any way. (author)

  7. TRANSPORT CHARACTERISTICS OF SELECTED PWR LOCA GENERATED DEBRIS

    International Nuclear Information System (INIS)

    MAJI, A. K.; MARSHALL, B.

    2000-01-01

    In the unlikely event of a Loss of Coolant Accident (LOCA) in a pressurized water reactor (PWR), break jet impingement would dislodge thermal insulation FR-om nearby piping, as well as other materials within the containment, such as paint chips, concrete dust, and fire barrier materials. Steam/water flows induced by the break and by the containment sprays would transport debris to the containment floor. Subsequently, debris would likely transport to and accumulate on the suction sump screens of the emergency core cooling system (ECCS) pumps, thereby potentially degrading ECCS performance and possibly even failing the ECCS. In 1998, the U. S. Nuclear Regulatory Commission (NRC) initiated a generic study (Generic Safety Issue-191) to evaluate the potential for the accumulation of LOCA related debris on the PWR sump screen and the consequent loss of ECCS pump net positive suction head (NPSH). Los Alamos National Laboratory (LANL), supporting the resolution of GSI-191, was tasked with developing a method for estimating debris transport in PWR containments to estimate the quantity of debris that would accumulate on the sump screen for use in plant specific evaluations. The analytical method proposed by LANL, to predict debris transport within the water that would accumulate on the containment floor, is to use computational fluid dynamics (CFD) combined with experimental debris transport data to predict debris transport and accumulation on the screen. CFD simulations of actual plant containment designs would provide flow data for a postulated accident in that plant, e.g., three-dimensional patterns of flow velocities and flow turbulence. Small-scale experiments would determine parameters defining the debris transport characteristics for each type of debris. The containment floor transport methodology will merge debris transport characteristics with CFD results to provide a reasonable and conservative estimate of debris transport within the containment floor pool and

  8. MOX and UOX PWR fuel performances EDF operating experience

    International Nuclear Information System (INIS)

    Provost, Jean-Luc; Debes, Michel

    2005-01-01

    Based on a large program of experimentations implemented during the 90s, the industrial achievement of new FAs designs with increased performances opens up new prospects. The currently UOX fuels used on the 58 EDF PWR units are now authorized up to a maximum FA burn-up of 52 GWd/t with a large experience from 45 to 50 GWd/t. Today, the new products, along with the progress made in the field of calculation methods, still enable to increase further the fuel performances with respect to the safety margins. Thus, the conditions are met to implement in the next years new fuel managements on each NPPs series of the EDF fleet with increased enrichment (up to 4.5%) and irradiation limits (up to 62 GWd/t). The recycling of plutonium is part of EDF's reprocessing/recycling strategy. Up to now, 20 PWR 900 MW reactors are managed in MOX hybrid management. The feedback experience of 18 years of PWR operation with MOX is satisfactory, without any specific problem regarding manoeuvrability or plant availability. EDF is now looking to introduce MOX fuels with a higher plutonium content (up to 8.6%) equivalent to natural uranium enriched to 3.7%. It is the goal of the MOX Parity core management which achieve balance of MOX and UOX fuel performance with a significant increase of the MOX average discharge burn-up (BU max: 52 GWd/t for MOX and UOX). The industrial maturity of new FAs designs, with increased performances, allows the implementation in the next years of new fuel managements on each NPPs series of the EDF fleet. The scheduling of the implementation of the new fuel managements on the PWRs fleet is a great challenge for EDF, with important stakes: the nuclear KWh cost decrease with the improvement of the plant operation performance. (author)

  9. Assessment of erbium as candidate burnable absorber for future PWR operaning cycles: A neutronic and fabrication study

    International Nuclear Information System (INIS)

    Asou, M.; Dehaudt, P.; Porta, J.

    1995-01-01

    Erbium begins to play a role in the control of PWR core reactivity. Generally speaking, burnable absorbers were only used to establish fresh core equilibrium. In France, since the possibility of extending irradiation cycles by 12 to 18 months, then up to 24 and 30 months, has been envisaged, there is renewed interest in burnable absorbers. The fabrication of PWR pellets has been investigated, providing high density and a good erbium homogeneity. The pellets characteristics were consistent with the specifications of PWR fuel. However, with the present process, the grain size remains small. Studies in progress now shows that erbium is not only a valuable alternative to gadolinium, for long fuel cycles (≥18 months) but also a new fuel concept. (orig.)

  10. Evaluation of ASME code flaw analysis procedure using the influence function method for application to PWR primary piping

    International Nuclear Information System (INIS)

    Hong, S.Y.; Yeater, M.L.

    1985-01-01

    This paper discusses stress intensity factor calculations and fatigue analysis for a PWR primary coolant piping system. The influence function method is applied to evaluate ASME Code Section XI Appendix A ''analysis of flaw indication'' for the application to a PWR primary piping. Results of the analysis are discussed in detail. (orig.)

  11. PWR reactor pressure vessel internals license renewal industry report; revision 1. Final report

    International Nuclear Information System (INIS)

    Schwirian, R.; Robison, G.

    1994-07-01

    The U.S. nuclear power industry, through coordination by the Nuclear Management and Resources Council (NUMARC), and sponsorship by the U.S. Department of Energy (DOE) and the Electric Power Research Institute (EPRI), has evaluated age-related degradation effects for a number of major plant systems, structures and components, in the license renewal technical Industry Reports (IRs). License renewal applicants may choose to reference these IRs in support of their plant-specific license renewal applications, as an equivalent to the integrated plant assessment provisions of the license renewal rule (10 CFR Part 54). Pressurized water reactor (PWR) reactor pressure vessel (RPV) internals designed by all three U.S. PWR nuclear steam supply system vendors have been evaluated relative to the effects of age-related degradation mechanisms; the capability of current design limits; inservice examination, testing, repair, refurbishment, and other programs to manage these effects; and the assurance that these internals can continue to perform their intended safety functions in the license renewal term. This industry report (IR), one of a series of ten, provides a generic technical basis for evaluation of PWR reactor pressure vessel internals for license renewal

  12. Design and Development of Virtual Reactivity System for PWR

    International Nuclear Information System (INIS)

    Anwar, M. I.

    2012-01-01

    The reactivity monitoring and investigation is an important mean to ensure the safety operation of a nuclear power plant. But the reactivity of the nuclear reactor usually cannot be directly measured. It should be computed with certain estimation method. In this thesis, an effort has been made using an artificial neural network and highly fluctuating experimental data for predicting the total reactivity of the nuclear reactor based on all components of net reactivity. This virtual reactivity system is designed by taking advantage of neural network's nonlinear mapping capability. Based on analysis of the reactivity contributing factors, several neural network models are built separately for control rod, boron, poisons, fuel Doppler Effect and moderator effect. Extensive simulation and validation tests for PWR show that satisfied results have been obtained with the proposed approach. It presents a new idea to estimate the PWR's reactivity using artificial intelligence. All the design and simulation work is carried out in MATLAB and a real time programming environment is chosen for the computation and prediction of reactivity. (author)

  13. Prevention against fragile fracture in PWR pressure vessel in the presence of pressurized thermal shock

    International Nuclear Information System (INIS)

    Carmo, E.G.D. do; Oliveira, L.F.S. de; Roberty, N.C.

    1984-01-01

    A method for the determination of operational limit curves (primary pressure versus temperature) for PWR is presented. Such curves give the operators indications related to the safety status of the plant concerning the possibility of a pressurized thermal shock. The method begins by a thermal analysis for several postulated transients, followed by the determination of the thermomechanical stresses in the vessel and finally it makes use of the linear elasticity fracture mechanics. Curves are shown for a typical PWR. (Author) [pt

  14. The NCSU [North Carolina State Univ.] freon PWR [pressurized water reactor] loop

    International Nuclear Information System (INIS)

    Caves, J.R.; Doster, J.M.; Miller, G.D.; Wehring, B.W.; Turinsky, P.J.

    1989-01-01

    The nuclear engineering department at North Carolina State University has designed and constructed an operating scale model of a pressurized water reactor (PWR) nuclear steam supply system (NSSS). This facility will be used for education, training, and research. The loop uses electric heaters to simulate the reactor core and Freon as the primary and secondary coolant. Viewing ports at various locations in the loop allow the students to visualize flow regimes in normal and off-normal operating conditions. The objective of the design effort was to scale the thermal-hydraulic characteristics of a two-loop Westinghouse NSSS. Provisions have been made for the simulation of various abnormal occurrences. The model is instrumented in much the same manner as the actual NSSS. Current research projects using the loop include the development of adaptive expert systems to monitor the performance of the facility, diagnose mechanical faults, and to make recommendations to operators for mitigation of accidents. This involves having thermal-hydraulics and core-physics simulators running faster than real time on a mini-supercomputer, with operating parameters updated by communication with the data acquisition and control computer. Further opportunities for research will be investigated as they arise

  15. A analysis of cementation technology for liquid radioactive-waste in PWR NPPs

    International Nuclear Information System (INIS)

    Chen Liang; Chen Li; Li Junhua

    2009-01-01

    Cementation is one of the most popular solidification technology for the low-and-intermediate level liquid radioactive waste. It has been applied in all of domestic PWR NPPs. The process characteristics and operation of the cementations in the different NPPs are introduced,and the advantage and disadvantage of the cementation are analyzed in this paper. A drum and a cask are compared as a package of the solidified waste, the drum can decrease over 50% final volume of the waste, furthermore the cost for manufacture and transportation for this drum is more cheaper than the cask, but an additional shielding may be necessary for the waste with higher level radioactivity that is packed in drum. More waste can be contained if an appropriate in-drum mixer is used while secondary waste will be unavoidable if the out-drum mixing is adopted. A carriage can make it easier to decontaminate on the surface of equipment and on the floor, furthermore the carriage is more economical than a roller conveyor in manufacture and maintenance. The cementation recipe for the waste should be optimized and additive material should be as less as possible to increase the containing rate of the waste. (authors)

  16. Evaluations on power ramp data of PWR fuels by FROST and THERMOST codes

    International Nuclear Information System (INIS)

    Murai, K.; Ogawa, S.; Nuno, H.; Kondo, Y.

    1987-01-01

    An evaluation is presented of power ramp data of Mitsubishi's PWR fuel rods tested in R-2, Studsvik, which was analysed by FROST and THERMOST codes. The analyses give good predictions for measured diameter changes and on-power rod elongations. The work indicates that FROST is capable of analysing both radial and axial pellet-cladding mechanism interaction (PCMI) appropriately, and that predicted states of PCMI (i.e. stress and strain which cannot be measured directly) are considered to be reliable. The ramp data used in the present analyses were obtained in two joint programmes with five Japanese PWR utilities (KEPCO, KYEPCO, SEPCO, HEPCO, and JAPCO). (UK)

  17. A PWR reactor downcomer modification for reduction of ECC bypass flow during LOCA

    International Nuclear Information System (INIS)

    Popov, N.; Bosevski, T.

    1986-01-01

    The ECC bypass phenomenon in the PWR reactor down-comer, which delays the reactor vessel refilling, after cold leg large break LOCA accident, has been subject of analysis in this paper. In the paper, a particular construction modification of the reactor down-comer has been suggested by inserting vertical ribs, aimed to intensify the reactor ECC refilling following the LOCA accident, and to advance the thermal-hydraulics safety of post-accidental cooling of the PWR reactors. To verify the effectiveness of the suggested down-comer construction modification, some properly selected results, obtained by corresponding verified mathematical model, have been presented in this paper. (author)

  18. AREVA solutions to licensing challenges in PWR and BWR reload and safety analysis

    Energy Technology Data Exchange (ETDEWEB)

    Curca-Tivig, Florin [AREVA GmbH, Erlangen (Germany)

    2016-05-15

    Regulatory requirements for reload and safety analyses are evolving: new safety criteria, request for enlarged qualification databases, statistical applications, uncertainty propagation.. In order to address these challenges and access more predictable licensing processes, AVERA is implementing consistent code and methodology suites for PWR and BWR core design and safety analysis, based on first principles modeling and extremely broad verification and validation data base. Thanks to the high computational power increase in the last decades methods' development and application now include new capabilities. An overview of the main AREVA codes and methods developments is given covering PWR and BWR applications in different licensing environments.

  19. Analysis of dynamic behavior of a PWR utilizing the computer program SARDAN 2

    International Nuclear Information System (INIS)

    Pessanha, J.A.O.

    1982-07-01

    In the design of a PWR nuclear plant it is necessary to verify if the design limits are respected, even under abnormal operation condition. An evolution of SARDAN code, developed to simulate transients in PWR, are presented. The new aspects incorporeted in SARDAN 2 are: the fuel ROD analysis in finite-diference, an open channel model for the critic subchannel analysis and the introduction of a simplified model for the automatic control system. The program has been tested in accident condition II, in special, uncontrolled ROD cluster assembly bank withoraw, dropped full-length assembly group, uncontrolled Boron dilution, and the results obtained were considered satisfactory. (Author) [pt

  20. Spain's nuclear industry achieves maturity with its third generation of PWR

    International Nuclear Information System (INIS)

    Vallejo, Juan

    1986-01-01

    The Vandellos II PWR is under construction at present, and commercial operation is scheduled for December 1987. Details of the planning and construction of the reactor are given. Technical data and a cutaway drawing are included. (UK)

  1. Radiation embrittlement of PWR vessel supports

    International Nuclear Information System (INIS)

    Cheverton, R.D.; Robinson, G.C.; Pennell, W.E.; Nanstad, R.K.

    1989-01-01

    Several studies pertaining to radiation damage of PWR vessel supports were conducted between 1978 and 1987. During this period, apparently there was no reason to believe that low-temperature (<100 degree C) MTR embrittlement data were not appropriate for evaluating embrittlement of PWR vessel supports. However, late in 1986, data from the High Flux Isotope Reactor (HFIR) vessel surveillance program indicated that the embrittlement rates of the several HFIR vessel materials (A212-B, A350-LF3, A105-II) were substantially greater than anticipated on the basis of MTR data. Further evaluation of the HFIR data suggested that a fluence-rate effect was responsible for the apparent discrepancy, and shortly thereafter it became apparent that this rate effect was applicable to the evaluation of LWR vessel supports. As a result, the Nuclear Regulatory Commission (NRC) requested that the Oak Ridge National Laboratory (ORNL) evaluate the impact of the apparent embrittlement rate effect on the integrity of light-water-reactor (LWR) vessel supports. The purpose of the study was to provide an indication of whether the integrity of reactor vessel supports is likely to be challenged by radiation-induced embrittlement. The scope of the evaluation included correlation of the HFIR data for application to the evaluation of LWR vessel supports; a survey and cursory evaluation of all US LWR vessel support designs, selection of two plants for specific-plant evaluation, and a specific-plant evaluation of both plants to determine critical flaw sizes for their vessel supports. 19 refs., 8 figs., 2 tabs

  2. Evaluation of uncertainties in the gamma-ray heating analysis of a PWR

    International Nuclear Information System (INIS)

    West, J.T.

    1977-01-01

    The limits of accuracy in a PWR gamma heating analysis, which used conventional one- and two-dimensional discrete ordinate transport methods, by utilizing three-dimensional Monte Carlo methods are determined

  3. Make use of EDF orientations in PWR fuel management

    International Nuclear Information System (INIS)

    Gloaguen, A.

    1989-01-01

    The EDF experience acquired permits to allow the PWR fuel performances and to make use of better management. In this domain low progress can be given considerable financial profits. The industrial and commercial structures, the time constant of the fuel cycle, has for consequence that the electric utilities can take advantage only progressively of the expected profits [fr

  4. Directives and general design requirements for a small PWR

    International Nuclear Information System (INIS)

    Arrieta, L.A.

    1992-08-01

    A proposal of directives and general requirements for the development of a small PWR conceptual design is presented. These directives address the main safety, performance and economic design aspects. The purpose is to use this work as a base for a wide discussion, involving all project participants, culminating with the definition of the final directives and general requirements. (author)

  5. Fracture toughness behavior of irradiated stainless steel in PWR systems

    Energy Technology Data Exchange (ETDEWEB)

    Xu, H.; Fyfitch, S. [AREVA NP Inc., Lynchburg, Pennsylvania (United States); Tang, H.T. [Electric Power Research Inst., Palo Alto, California (United States)

    2007-07-01

    Data from available research programs were collected and evaluated by the Electric Power Research Institute (EPRI) Materials Reliability Program (MRP) to determine the relationship between fracture toughness and neutron fluence for conditions representative of pressurized water reactor (PWR) conditions. It is shown that the reduction of fracture toughness with increasing neutron dose in both boiling water reactors (BWRs) and PWRs is consistent with that observed in fast reactors. The lower bound fracture toughness observed for irradiated stainless steels in PWRs is 38 MPa{radical}m (34.6 ksi{radical}in) at neutron exposures greater than 6.7 X 10{sup 21} n/cm{sup 2} (E > 1.0 MeV) or approximately 10 dpa. For such levels of fracture toughness, it is recommended that linear-elastic fracture mechanics (LEFM) analyses be considered for design and operational analyses. The results from this study can be used by the nuclear industry to assess the effects of irradiation on stainless steels in PWR systems. (author)

  6. Calculation of drop course of control rod assembly in PWR

    International Nuclear Information System (INIS)

    Zhou Xiaojia; Mao Fei; Min Peng; Lin Shaoxuan

    2013-01-01

    The validation of control rod drop performance is an important part of safety analysis of nuclear power plant. Development of computer code for calculating control rod drop course will be useful for validating and improving the design of control rod drive line. Based on structural features of the drive line, the driving force on moving assembly was analyzed and decomposed, the transient value of each component of the driving force was calculated by choosing either theoretical method or numerical method, and the simulation code for calculating rod cluster control assembly (RCCA) drop course by time step increase was achieved. The analysis results of control rod assembly drop course calculated by theoretical model and numerical method were validated by comparing with RCCA drop test data of Qinshan Phase â…¡ 600 MW PWR. It is shown that the developed RCCA drop course calculation code is suitable for RCCA in PWR and can correctly simulate the drop course and the stress of RCCA. (authors)

  7. A concept of PWR using plate and shell heat exchangers

    International Nuclear Information System (INIS)

    Freire, Luciano Ondir; Andrade, Delvonei Alves de

    2015-01-01

    In previous work it was verified the physical possibility of using plate and shell heat exchangers for steam generation in a PWR for merchant ships. This work studies the possibility of using GESMEX commercial of the shelf plate and shell heat exchanger of series XPS. It was found it is feasible for this type of heat exchanger to meet operational and accidental requirements for steam generation in PWR. Additionally, it is proposed an arrangement of such heat exchangers inside the reactor pressure vessel. Such arrangement may avoid ANSI/ANS51.1 nuclear class I requirements on those heat exchangers because they are contained in the reactor coolant pressure barrier and play no role in accidental scenarios. Additionally, those plates work under compression, preventing the risk of rupture. Being considered non-nuclear safety, having a modular architecture and working under compression may turn such architectural choice a must to meet safety objectives with improved economics. (author)

  8. A new approach to PWR power control using intelligent techniques

    International Nuclear Information System (INIS)

    Boroushaki, M.; Ghofrani, M.B.; Lucas, C.; Yazdanpanah, M.J.; Sadati, N.

    2004-01-01

    Improved load following capability is one of the main technical performances of advanced PWR(APWR). Controlling the nuclear reactor core during load following operation encounters some difficulties. These difficulties mainly arise from nuclear reactor core limitations in local power peaking, while the core is subject to large and sharp variation of local power density during transients. Axial offset (A.O) is the parameter usually used to represent of core power peaking, in form of a practical parameter. This paper, proposes a new intelligent approach to A.o control of PWR nuclear reactors core during load following operation. This method uses a neural network model of the core to predict the dynamic behavior of the core and a fuzzy critic based on the operator knowledge and experience for the purpose of decision-making during load following operations. Simulation results show that this method can use optimum control rod groups maneuver with variable overlapping and may improve the reactor load following capability

  9. A concept of PWR using plate and shell heat exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Freire, Luciano Ondir; Andrade, Delvonei Alves de, E-mail: luciano.ondir@gmail.com, E-mail: delvonei@ipen.br [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil)

    2015-07-01

    In previous work it was verified the physical possibility of using plate and shell heat exchangers for steam generation in a PWR for merchant ships. This work studies the possibility of using GESMEX commercial of the shelf plate and shell heat exchanger of series XPS. It was found it is feasible for this type of heat exchanger to meet operational and accidental requirements for steam generation in PWR. Additionally, it is proposed an arrangement of such heat exchangers inside the reactor pressure vessel. Such arrangement may avoid ANSI/ANS51.1 nuclear class I requirements on those heat exchangers because they are contained in the reactor coolant pressure barrier and play no role in accidental scenarios. Additionally, those plates work under compression, preventing the risk of rupture. Being considered non-nuclear safety, having a modular architecture and working under compression may turn such architectural choice a must to meet safety objectives with improved economics. (author)

  10. Liquid radioactive waste processing improvement of PWR nuclear power plants

    International Nuclear Information System (INIS)

    Nery, Renata Wolter dos Reis; Martinez, Aquilino Senra; Monteiro, Jose Luiz Fontes

    2005-01-01

    The study evaluate an inorganic ion exchange to process the low level liquid radwaste of PWR nuclear plants, so that the level of the radioactivity in the effluents and the solid waste produced during the treatment of these liquid radwaste can be reduced. The work compares two types of ion exchange materials, a strong acid cation exchange resin, that is the material typically used to remove radionuclides from PWR nuclear plants wastes, and a mordenite zeolite. These exchange material were used to remove cesium from a synthetic effluent containing only this ion and another effluent containing cesium and cobalt. The breakthrough curves of the zeolite and resin using a fix bed reactor were compared. The results demonstrated that the zeolite is more efficient than the resin in removing cesium from a solution containing cesium and cobalt. The results also showed that a bed combining zeolite and resin can process more volume of an effluent containing cesium and cobalt than a bed resin alone. (author)

  11. Secure and effective valve stem sealing in PWR power generating plants

    International Nuclear Information System (INIS)

    Reynolds, J.

    1991-01-01

    The PWR power generating plant combines severe operating conditions with the highest safety requirements, making it one of the most demanding environments for seals. An analysis of the conditions inherent in its operation reveals: an aggressive and radioactive fluid at high temperature and pressure; frequent thermal shocks; and hazards for maintenance personnel in the containment area unless the reactor is shut down. The achievement of today's quality and safety standards owes much to the experience, research and testing carried out by the Electricite de France during its graduation from its first nuclear unit to become the world's most important manager of PWR plants with over 45 now under its control. The number of valves involved in the French nuclear program is in excess of 1,300,000. Knowing what the affect of a leak can be, especially if it necessitates a shutdown of the power station, the need to insure the quality of valve sealing can be appreciated. At the beginning of their nuclear building program, the EdF was finding that valves, representing only 2 percent of the investment in a PWR plant, caused 20% of the unwanted outages and cost 60% of the total of plant maintenance. In this report, the author endeavors to show how this problem was solved by team work and concerted action by the EdF, the valve constructors and seal manufacturer, not forgetting the importance of informing and training the maintenance and repair teams within the power stations themselves

  12. Loss of feedwater heater analysis for the South Texas Project

    International Nuclear Information System (INIS)

    Joyce, K.C.; Johnson, M.R.; Albury, C.R.

    1987-01-01

    The results of the steady state and transient analyses of the low pressure feedwater heater train for the South Texas Nuclear Project are presented. The South Texas Project consists of two 1250 MW Westinghouse PWR units. This analysis was performed using the Modular Modeling System (MMS) simulation code. The model presented will be incorporated into the secondary side model in support of the plant training simulator and the analysis of secondary side transients. Results of this analysis are considered preliminary until benchmarked against actual plant data. A model description of the feedwater heater train from the condensate pumps to the deaerator is presented. The methodology used to develop the model is also discussed. Results of the steady state run are presented, and a transient, the loss of extraction steam to feedwater heater 15A, is examined

  13. Study of PWR reactor efficiency as a function of turbine steam extractions

    International Nuclear Information System (INIS)

    Rocha, Janine Gandolpho da; Alvim, Antonio Carlos Marques; Martinez, Aquilino Senra

    2002-01-01

    The objective of this work is to optimize the extractions of the low-pressure turbine of a PWR nuclear reactor, in order to obtain the best thermodynamic cycle efficiency. We have analyzed typical data of a 1300 MW PWR reactor, operating at 25%, 50%, 75% and 100% capacities, respectively. The first stage of this study consists of generating a mathematical model capable of describing the reactor behavior and efficiency at any power level. The second stage of this study consists of to combine the generated mathematical model in an optimization computer program that optimize the extractions flow of the low-pressure turbine until it finds the optimal system efficiency. This work does not alter the nuclear facility project in any way. (author)

  14. Light water reactors development in Japan. (1) Introduction of LWR technology (PWR)

    International Nuclear Information System (INIS)

    Yamada, Ichita; Suzuki, Shigemitsu

    2008-01-01

    Evolutionary progress of the LWR plants in the last half-century was reviewed in series. Introduction of LWR technology (PWR) in Japan was reviewed in this article. Kansai Electric Power imported the Mihama-1 - a 340 MWe PWR built by Westinghouse Corp. It began operating in 1970 to supply power to the World Exposition (EXPO70). There followed a period in which designs was purchased from US vendors and they were constructed with the co-operation of Mitsubishi Heavy Industry, who would then receive a license to build similar plants in Japan and develop the capacity to design and construct PWRs by itself. Progress of designs, fabrications, project management and construction of PWRs were reviewed from technology transfer to its autonomy age. (T. Tanaka)

  15. Singular deposit formation in PWR due to electrokinetic phenomena - application to SG clogging

    Energy Technology Data Exchange (ETDEWEB)

    Guillodo, M.; Muller, T.; Barale, M.; Foucault, M. [AREVA NP SAS, Technical Centre (France); Clinard, M.-H.; Brun, C.; Chahma, F. [AREVA NP SAS, Chemistry and Radiochemistry Group (France); Corredera, G.; De Bouvier, O. [Electricite de France, Centre d' Expertise de I' inspection dans les domaines de la Realisation et de l' Exploitation (France)

    2009-07-01

    The deposits which cause clogging of the 'foils' of the tube support plates (TSP) in Steam Generators (SG) of PWR present two characteristics which put forward that the mechanism at the origin of their formation is different from the mechanism that drives the formation of homogeneous deposits leading to the fouling of the free spans of SG tubes. Clogging occurs near the leading edge of the TSP and the deposits appear as diaphragms localized between both TSP and SG tubing materials, while the major part of the tube/TSP interstice presents little or no significant clogging. This type of deposit seems rather comparable to the ones which were reproduced in Lab tests to explain the flow rate instabilities observed on a French unit during hot shutdown in the 90's. The deposits which cause TSP clogging are owed to a discontinuity of the streaming currents in the vicinity of a surface singularity (orifices, scratches ...) which, in very low conductivity environment, produce local potential variations and/or current loop in the metallic pipe material due to electrokinetic effects. Deposits can be built by two mechanisms which may or not coexist: (i) accumulation of particles stabilized by an electrostatic attraction due to the local variation of electrokinetic potential, and (ii) crystalline growth of magnetite produced by the oxidation of ferrous ions on the anodic branch of a current loop. Lab investigations carried out by AREVA NP Technical Centre since the end of the 90's showed that this type of deposit occurs when the redox potential is higher than a critical value, and can be gradually dissolved when the potential becomes lower than this value which depends on the 'Material - Chemistry' couple. Special emphasis will be given in this paper to the TSP clogging of SG in PWR secondary coolant dealing particularly with the potential strong effect of electrokinetic phenomena in low conductive environment and in high temperature conditions

  16. On-line chemistry monitoring for the secondary side

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Babcock and Wilcox (B and W) has developed a computerized water chemistry data acquisition and management system for nuclear plant secondary coolant systems. The Integrated Water Chemistry Monitoring System (IWCMS) provides on-line monitoring of conditions and rapid trend analysis of sampled data. So far it has been installed at GPU Three Mile Island unit 1 and at Toledo Edison Davis-Besse. The IWCMS meets the following utility needs for monitoring power plant chemistry: control of chemistry conditions to minimize corrosion and extend component/system life; continuous analysis of data from on-line detectors and grab samples; expediting of transient recovery actions with trend, alarm and evaluation capability; provision for rapid sharing of useful operational chemistry information; concentration of attention on evaluation instead of data manipulation. The system is composed of three functional parts: data acquisition hardware; PC-based computer system and customised system software. (author)

  17. Contribution to the study of the conversion PWR type reactors to the thorium cycle

    International Nuclear Information System (INIS)

    Martins Filho, J.R.

    1980-01-01

    The use of the thorium cycle in PWR reactors is discussed. The fuel has been calculated in the equilibrium condition for a economic comparison with the uranium cycle (in the same condition). First of all, a code named EQUILIBRIO has been developed for the fuel equilibrium calculation. The results gotten by this code, were introduced in the LEOPARD code for the fuel depletion calculation (in the equilibrium cycle). Same important physics details of fuel depletion are studied, for instance: the neutron balance, power sharing, fuel burnup, etc. The calculations have been done taking as reference the Angra-1 PWR reactor. (Author) [pt

  18. WESTINGHOUSE 17X17 MOX PWR ASSEMBLY - WASTE PACKAGE CRITICALITY ANALYSIS (SCPB: N/A)

    International Nuclear Information System (INIS)

    J.W. Davis

    1996-01-01

    This analysis is prepared by the Mined Geologic Disposal System (MGDS) Waste Package Development Department (WPDD) to compare the criticality potential of Westinghouse 17 x 17 mixed oxide (MOX) PWR fuel with the Design Basis spent nuclear fuel (SNF) analyzed previously (Ref. 5.1, 5.2). The basis of comparison will be the conceptual design Multi-Purpose Canister (MPC) PWR waste package concepts. The objectives of this evaluation are to show that the criticality potential of the MOX fuel is equal to or lower than the DBF or, if necessary, indicate what additional measures are required to make it so

  19. Water regime of steam power plants

    International Nuclear Information System (INIS)

    Oesz, Janos

    2011-01-01

    The water regime of water-steam thermal power plants (secondary side of pressurized water reactors (PWR); fossil-fired thermal power plants - referred to as steam power plants) has changed in the past 30 years, due to a shift from water chemistry to water regime approach. The article summarizes measures (that have been realised by chemists of NPP Paks) on which the secondary side of NPP Paks has become a high purity water-steam power plant and by which the water chemistry stress corrosion risk of heat transfer tubes in the VVER-440 steam generators was minimized. The measures can also be applied to the water regime of fossil-fired thermal power plants with super- and subcritical steam pressure. Based on the reliability analogue of PWR steam generators, water regime can be defined as the harmony of construction, material(s) and water chemistry, which needs to be provided in not only the steam generators (boiler) but in each heat exchanger of steam power plant: - Construction determines the processes of flow, heat and mass transfer and their local inequalities; - Material(s) determines the minimal rate of general corrosion and the sensitivity for local corrosion damage; - Water chemistry influences the general corrosion of material(s) and the corrosion products transport, as well as the formation of local corrosion environment. (orig.)

  20. Pu recycling in a full Th-MOX PWR core. Part I: Steady state analysis

    International Nuclear Information System (INIS)

    Fridman, E.; Kliem, S.

    2011-01-01

    Research highlights: → Detailed 3D 100% Th-MOX PWR core design is developed. → Pu incineration increased by a factor of 2 as compared to a full MOX PWR core. → The core controllability under steady state conditions is demonstrated. - Abstract: Current practice of Pu recycling in existing Light Water Reactors (LWRs) in the form of U-Pu mixed oxide fuel (MOX) is not efficient due to continuous Pu production from U-238. The use of Th-Pu mixed oxide (TOX) fuel will considerably improve Pu consumption rates because virtually no new Pu is generated from thorium. In this study, the feasibility of Pu recycling in a typical pressurized water reactor (PWR) fully loaded with TOX fuel is investigated. Detailed 3-dimensional 100% TOX and 100% MOX PWR core designs are developed. The full MOX core is considered for comparison purposes. The design stages included determination of Pu loading required to achieve 18-month fuel cycle assuming three-batch fuel management scheme, selection of poison materials, development of the core loading pattern, optimization of burnable poison loadings, evaluation of critical boron concentration requirements, estimation of reactivity coefficients, core kinetic parameters, and shutdown margin. The performance of the MOX and TOX cores under steady-state condition and during selected reactivity initiated accidents (RIAs) is compared with that of the actual uranium oxide (UOX) PWR core. Part I of this paper describes the full TOX and MOX PWR core designs and reports the results of steady state analysis. The TOX core requires a slightly higher initial Pu loading than the MOX core to achieve the target fuel cycle length. However, the TOX core exhibits superior Pu incineration capabilities. The significantly degraded worth of control materials in Pu cores is partially addressed by the use of enriched soluble boron and B 4 C as a control rod absorbing material. Wet annular burnable absorber (WABA) rods are used to flatten radial power distribution